[0:03] So, we'll call the town council meeting [0:06] of May 12th, 2026 to order at 70:02. [0:10] Jennifer, will you take role? [0:12] >> Coun Council member Aberish [0:13] >> here. [0:14] >> Council member Brown [0:15] >> here. [0:16] >> Council member Gold. Council member Wall [0:18] >> here. Mayor Donowski [0:21] >> here. Council member Aberish, will you [0:23] lead us in the pledge of allegiance? [0:37] under God, indivisible, liberty and [0:40] justice for all. [0:44] » Thank you, Assan. Appreciate it. [0:47] >> And with that, we're going to open up [0:49] public comment. So, persons wishing to [0:51] address the council on non-aggendaized [0:53] items are invited to do so now. Please [0:56] note, however, the council cannot [0:57] undertake any items that are not on the [0:59] agenda. Uh we can refer those to staff [1:01] for a future action. Uh this [1:04] communication period is limited to five [1:06] persons, three minutes each. Any [1:08] additional persons wishing to be heard [1:10] will be heard at the end of regular [1:11] business. And because we have a full [1:13] house tonight and a big agenda, we are [1:15] going to hold it to those five people at [1:17] three minutes each. Are there is there [1:19] anybody here that would like to make a [1:21] comment on a non-aggendaized item? [1:28] Come on up. [1:30] Great. [1:34] » I really need help from our town [1:37] council. We are having a terrible [1:40] problem with tick tockers [1:43] coming on dirt bikes on Woodside Road [1:48] all the way up Kings Mountain. They're [1:50] parking everywhere, all over the roads. [1:52] There are no restrooms. So, you know [1:53] what's going on on the side of the [1:55] roads? They're riding through the woods. [1:58] They're destroying [2:01] the the entire environment and scurrying [2:04] all the wildlife down into the flats [2:06] down here. I've lived in Skyline for 30 [2:08] years. I've never seen this kind of [2:10] destruction. I need help. Please. [2:15] >> Thank you, Bri. [2:19] Jean and Melissa, we both sort of [2:21] connected, but we didn't reconnect on [2:22] this. Is there anything that we would we [2:24] can add to uh where we are in terms of [2:26] figuring out those trails? [2:28] >> Yes, we looked at the photographs that [2:30] uh Brie sent in and the portion where [2:32] the vehicles are parked are actually um [2:35] county and so Lewis, I think you might [2:38] have a little bit to add to that. [2:39] >> And that's correct. Um we looked at the [2:41] map and it looks like um the section on [2:44] uh Kings Mountain Row is part of the [2:46] county's jurisdiction. um staff will [2:49] reach out to the county and we'll work [2:50] with work work with them on perhaps [2:52] installing some no parking signs along [2:54] that stretch [2:58] » with me. [2:59] >> Okay. Okay, we got you. Um All right. [3:02] Any other comments? Public comments on [3:03] non-aggendaized items? [3:08] » Seeing none, we'll close public comment. [3:10] And we have two presentations this [3:13] evening. The first is on a historic [3:15] preservation award. Welcome. [3:21] » Hello. I'm Melanie Olsen, associate [3:23] planner with the town of Woodside as [3:26] well as the staff lays on to the [3:27] Woodside history committee, the [3:30] wonderful gals over here. And so [3:32] anyways, just kind of wanted to give a [3:34] few updates on the committee's been up [3:36] to um as well as kind of uh this month [3:40] is or with the National uh Trust for [3:43] Historic Preservation, they proclaim May [3:46] as history month. So [3:48] >> at the end, I'd like to read the [3:49] proclamation to proclaim the history [3:52] month for the town if that's okay. So [3:54] >> that's great. So yeah, so the Woodside [3:57] history committee uh they've been [3:59] encouraging uh exploring the town's [4:02] history by participating and promoting [4:05] uh [4:07] community mus museum walking tours uh [4:10] with Sonteo County History Association. [4:12] They've been doing it for several years. [4:14] They also have a brochure for [4:16] self-guided tours. Uh they participated [4:19] in the Mayday parade. um they currently [4:23] are working on a uh Woodside Fire [4:26] Protection District Museum exhibit in [4:29] the museum. So hopefully um people in [4:31] this room will be interested in checking [4:33] that out uh this summer. Um we'll have [4:36] more details to follow. And then tonight [4:40] earlier we had the Woodside Preservation [4:42] Awards. The museum hosted the open [4:45] house, gave out two awards uh this year. [4:48] Uh first to the Laquesta Winery. Uh the [4:51] recipients were Susan McBain and Jay [4:54] Patterson. Uh EMTT Ricksford was a San [4:57] Francisco attorney. Uh the winery was [5:00] established in 1883. [5:02] It had 7,000 vines imported from France. [5:05] In 1902, they hired a stones mason to [5:09] build the winery using the stones that [5:10] were found on the property. Um and then [5:14] it was later converted into a private [5:16] residence. Uh so uh the McBaines have [5:19] restored that. And then the second [5:22] recipient was the telephone exchange by [5:25] uh owned by Sue Pleti and Pat Delgavio [5:29] who we know well. Uh it's a Spanish [5:31] style building housed a telephone [5:33] exchange which was operated by the [5:35] Pacific Telephone and Telegraph Company [5:37] in 1928. [5:39] Um, and then also for everyone else in [5:43] the room there, uh, we have three [5:46] community museums in town. Uh, one right [5:49] across the way that's open on the first [5:51] and third Saturday, 1 to 3. Admission is [5:54] free. Uh, we have the Woodside Store [5:57] Museum open on Tuesdays and Thursdays as [5:59] well as the weekend, also free. And then [6:02] lastly, the Fulier Estate Stable Museum, [6:05] um, which is also free on the weekends. [6:08] And then uh the community or the history [6:11] committee wanted to say how happy they [6:13] are uh that the Brisbane Elementary [6:16] bought the property um next door. So [6:19] we're looking forward to what they're [6:21] going to do with that next. [6:25] Um so now I'm going to read the pro [6:27] proclamation uh uh making this month [6:31] history month for the town of Woodside. [6:35] Uh whereas historic preservation is an [6:38] effective tool for managing sustainable [6:40] development, revitalizing neighborhoods, [6:43] fostering local pride, and maintaining [6:46] comm community character while enhancing [6:48] livability. And whereas the historic [6:50] preservation is relevant for communities [6:53] across the nation, both urban and rural, [6:56] and for Americans of all ages, all walks [6:59] of life, and all ethnic backgrounds. and [7:02] where it is important to celebrate the [7:04] role of history in our lives and the [7:06] contributions made by dedicated [7:08] individuals in helping to preserve the [7:11] tangible aspects of the heritage that [7:14] has shaped us all as a people. And [7:16] whereas in alignment with the ongoing [7:18] theme established by the National Trust, [7:21] all people are created equal is the [7:23] theme of Woodside's preservation month [7:25] this year. And lastly, whereas the Town [7:28] of Woodside History Committee has [7:30] planned events and activities to [7:32] celebrate this month through the [7:35] promotion of Woodside Town Center [7:36] Walking Tour for museum visitors to [7:39] explore the Woodside Commercial District [7:41] and its buildings in addition to the [7:43] annual preservation awards program. It [7:46] is in support of general plan policies [7:49] to promote historic preservation and [7:51] awareness of local history and its [7:53] historic resources. Thank you so much. [7:56] Thank you, Melanie. Thank you, history [7:58] committee. [7:58] >> Well, I think Dalia wants to say [8:00] something else. [8:02] >> I know you're acknowledging the crew [8:04] later, but I I just want to add our [8:06] thanks for um Eddie and Ignasio and his [8:09] crew because they've been very helpful [8:11] and responsive when we need help help at [8:15] the museum. So, um we we thank them. We [8:18] thank you. So, [8:20] >> great. Thank you. [8:24] Uh, and we also have National Public [8:27] Works Week and we have a proclamation. [8:29] Lewis, should I just go? I just take it. [8:32] Is there anything you would like to say? [8:35] >> Go ahead. [8:36] >> Okay. Well, I'll just uh obviously uh uh [8:39] you know, first off, you guys are all [8:40] our unsung heroes from all the [8:42] day-to-day to keeping us where we need [8:45] to be in the floods and the storms. [8:46] Thank you very much. [8:52] And we have this proclamation to [8:54] recognize National Public Works Week, [8:57] which is this week. So whereas public [8:59] works professionals focus on [9:01] infrastructure, facilities, and services [9:04] that are of vital importance to [9:06] sustainable and resilient communities, [9:07] and to public health, high quality of [9:09] life, and well-being of the people of [9:10] Woodside. And whereas these [9:13] infrastructure facilities and services [9:15] could not be provided without the [9:16] dedicated efforts of public works [9:18] professionals who are engineers, [9:19] managers and employees at all level of [9:21] government and the private sector who [9:23] are responsible for rebuilding, [9:25] improving and protecting our nation's [9:27] transportation, water supply, water [9:29] treatment and solid waste systems, [9:31] public buildings and other structures [9:32] and facilities essential for our [9:34] citizens. [9:35] And whereas it is in the public interest [9:37] for the citizens, civic leaders, and [9:39] children in the town of Woodside to gain [9:41] knowledge of and maintain an ongoing [9:43] interest and understanding of the [9:44] importance of public works and public [9:46] works programs in their respective [9:47] communities. And whereas the year 2026 [9:50] marks the 66th year of National Public [9:54] Works Week sponsored by the American [9:55] Public Works Association. Now therefore, [9:58] be it proclaimed on this 12th day of [10:00] May, 2026 that I, Brian Dowski, mayor of [10:03] the town of Woodside, do hereby [10:04] designate the week of May 17 through [10:07] 23rd 23 as National Public's Work Week. [10:10] I urge all citizens to join [10:12] representatives of the American Public [10:13] Works Association and government [10:15] agencies in activities, events, and [10:17] ceremonies designed to pay tribute to [10:19] our public works professionals, [10:20] engineers, managers, and employees, and [10:22] to recognize the substantial [10:23] contributions they make to protecting [10:25] our national health, safety, and [10:27] advancing the quality of life for all. [10:29] Thank you. We really, really appreciate [10:31] everything that you do for us. [10:38] And mayor, if I may, um I would like to [10:40] um I have our public works staff here [10:42] today with me in the audience. I would [10:43] like for them to stand to receive this [10:45] um honor and recognition. And also, if I [10:48] may, um also point out that last Friday, [10:51] uh our maintenance supervisor, Ignasio [10:53] Hernandez, received an award, operation [10:55] of maintenance person of the year award [10:57] from the APWA organization. So, I have a [11:00] plaque here today and we're going to [11:01] present this to him tomorrow. So, [11:03] congratulations to the team. We're [11:05] really proud of them and of their [11:06] service to the town. And um thank you [11:09] for your continued support. [11:10] >> Thank you. [11:26] » Okay. Uh moving right along uh to the [11:29] consent agenda. So, all items on the [11:31] consent calendar are considered to be [11:33] routine and will be approved by one roll [11:35] call motion unless a request is made for [11:37] an item to be withdrawn or transferred [11:39] to the regular agenda. Are there any [11:40] items that any council member would like [11:43] to pull from the consent calendar? [11:47] Are there any items any member of the [11:49] public would like to see us pull? [11:52] Seeing none and hearing none, uh, we [11:54] will entertain a motion for the consent [11:56] calendar. [11:56] >> I'll make a motion that we approve the [11:58] consent calendar. [11:59] >> Second. Second. [12:01] >> Council member Alberish. [12:02] >> Yes. [12:02] >> Council member Brown. [12:03] >> Yes. [12:04] >> Council member Gold. [12:05] >> Yes. [12:05] >> Council member Wall. [12:06] >> Yes. [12:07] >> Mayor Domowski. [12:09] >> Yes. Thank you. All right. Moving on to [12:11] new business. Item A, a resolution [12:13] approving outofclass compensation for [12:16] the acting town manager. [12:19] Corey. [12:20] >> Hello. Good evening, town council. I'm [12:22] Corey Stalker Pedalino, the um [12:23] administrative services director. Um, [12:26] I'm bringing forward item agenda item A [12:29] for new business related to approving [12:31] outofclass acting pay for our acting [12:33] town manager. So, since February 19th, [12:36] 2026, the town council placed U. Melissa [12:39] Cardinoli, also known as the acting town [12:41] manager, into the acting role and [12:44] typically within other municipalities, [12:45] what is typically offered is either a 5 [12:47] to 10% out of class or acting pay as in [12:51] she's absorbed the responsibilities from [12:53] a higher classification. So, she was [12:55] currently the assistant town manager. [12:57] She is now serving as the acting town [12:59] manager. Therefore, it is recommended [13:01] that the town council adopt a 10% um [13:05] acting pay to her base salary. And we [13:07] would like that to be retroactive to [13:10] February 19th of 2026. And I'm happy to [13:12] answer any questions. [13:14] >> Thank you, Corey. Any questions? [13:18] All right. Hearing none. Any comments [13:20] from the public on this item? [13:24] Seeing none [13:25] >> comment. [13:26] >> Yes, sir. [13:26] >> Um, I actually wasn't planning on saying [13:28] anything, but as is my habit, I do. Um, [13:33] there's been a, you know, obviously some [13:35] unplanned things happened on February [13:36] 17th, and I just wanted to commend [13:39] Melissa, uh, who parachuted in. Um, and [13:43] there's been comments made that the town [13:46] is in chaos and those sorts of things, [13:47] and nothing could be further from the [13:49] truth. Um, since you took over, we've [13:52] presented audited financials here. We've [13:54] had the largest events in our in our [13:56] history, the Mayday event, the uh fun [13:59] run, the Mayday parade. Um, things have [14:02] pretty much come off without a hitch. [14:03] This may be tonight one of the largest [14:06] uh documents we've ever had before us. [14:08] And it's not only to the credit of our [14:10] acting town manager, but the entire [14:13] staff. And I think that they've done a [14:14] fantastic job uh in making sure that the [14:17] town runs smoothly under likely the most [14:20] adverse circumstances this town may have [14:22] ever seen. Um and I just wanted to say I [14:25] appreciate it and I thank you for it. [14:26] Melissa, you've done an unbelievable job [14:28] and um I know that this has the [14:30] endorsement of everybody on the town [14:31] council. So, thank you. [14:34] >> Very nice. Thank you. Uh would you like [14:36] to make a motion? I would that we um [14:39] authorize item A is it on the um uh on [14:43] the calendar tonight. [14:45] >> Second that. [14:46] >> Council member Alberish. [14:48] >> Yes. [14:48] >> Council member Brown. [14:49] >> Yes. [14:49] >> Council member Gold. [14:50] >> Yes. [14:50] >> Council member Wall. [14:52] >> Yes. [14:52] >> Mayor Donowski. [14:54] >> Yes. Okay. How's that for efficiency to [14:58] the main event tonight? Um all right. So [15:01] obviously tonight we have a public [15:02] hearing on the appeal for 10 Still [15:04] Creek. This is item B, public hearing. [15:07] Uh before we hand things off, we do want [15:09] to acknowledge that we understand this [15:10] has been a long process, a multi-year [15:12] process, and to acknowledge that uh we [15:15] know there's a lot of passion in the [15:16] room, and all we're simply asking is [15:18] that um we be respectful of our [15:21] neighbors and one another. Certainly can [15:23] show passion, but if we could be as [15:25] respectful as possible, that would be [15:26] great. So, the way this works is the [15:28] staff will make a report. Uh we'll ask [15:30] questions of staff, then we'll open the [15:32] public hearing. We'll hear from the [15:34] appellant. We'll have public comment and [15:36] then we will close the public hearing [15:38] and um ideally move to deliberations and [15:41] so forth. So, um with that, we will turn [15:45] it over to staff to make the report and [15:48] it looks by microphone. I'm going to you [15:50] Sage. [15:51] >> Thank you, Mayor. Good evening, council [15:52] members. Um so, I'll just give a a real [15:56] brief background. uh the the applicant [16:00] who is the appellant in this case um [16:03] since the beginning has submitted three [16:05] projects with variations amongst those [16:08] projects. Uh we're looking at the third [16:10] project that was reviewed by the ASRB. [16:14] Um, and after detailed discussion at the [16:17] ASRB meeting, uh, they they make a [16:20] recommendation to the town council, I'm [16:22] sorry, to the planning commission. And [16:24] the ASRB by a 2:1 vote, um, recommended [16:29] a denial of the design of the project. [16:32] Um, the ASRB does not uh take positions [16:35] or make findings on the other [16:37] entitlements such as a setback exception [16:40] um, and the resident size exception. [16:43] Uh so after the ASRB review um they made [16:47] their recommendation to the planning [16:49] commission. The planning commission [16:50] reviewed this project and after a very [16:53] detailed discussion a lot of public [16:55] comment [16:57] the planning commission by a 32 vote um [17:01] denied the setback exception by not [17:04] being able to make findings one or five [17:07] of the setback exception. uh they did [17:10] not take action on the formal design [17:12] review or resident size exception. Um [17:15] with the the vote and not being able to [17:20] make those two findings, the setback [17:23] exception was denied, therefore denying [17:25] the project. You need all of the [17:27] entitlements to make the project move [17:29] forward. So after that, the um applicant [17:33] filed a timely appeal of that decision. [17:36] And that brings us to uh the council [17:39] meeting tonight. Um this meeting is uh [17:44] the appeals are heard denovo. So that [17:47] means the uh council can consider all [17:50] the information of the record and come [17:52] to its own conclusion on the required [17:55] entitlements. [17:56] The town council will determine if it [17:59] can make all of the necessary findings [18:01] for approval of the entitlements. Um if [18:04] any of the findings cannot be made, the [18:06] uh council would state why and would [18:09] could deny the project. [18:13] Um so I'm just going to briefly go [18:16] through um the project overview and you [18:20] know there's a lot of information that's [18:21] been provided um and if you have any [18:25] questions uh you know let me know. But [18:27] um I'm just going to do uh quickly run [18:30] through the project terms of its [18:31] location and elevations. [18:48] Okay. So um this is the full site on the [18:52] left side. Um it has a net area of a [18:56] little over eight acres. Um it is a bit [18:59] unique in that it has a private road [19:01] bisecting the property. Um and there are [19:04] different easements on the property. [19:06] Most notably uh conservation easement [19:09] that runs through a good portion of the [19:12] northern side or the left side of the [19:14] property if you're looking at the [19:16] screen. [19:18] On the right side is a zoomedin area of [19:21] where the proposed development would [19:23] take place. The applicant is proposing a [19:28] uh main residence uh with an attached [19:30] garage [19:32] area um that has a J AU, a junior ADU on [19:36] top of that as well as which also [19:39] attaches to uh an accessory dwelling [19:42] unit. So, if you see where my cursor is, [19:45] this is the proposed um location of the [19:48] main part of the main residence. There's [19:51] a grove of trees in this area here, [19:53] which are represented by the black dots. [19:56] And this piece here is an elevated [19:59] enclosed bridge or hallway um that [20:03] connects from the main piece of the [20:05] residence to an area that includes an [20:08] elevator um with the JADU on the middle [20:12] floor and the garage on the lower level. [20:15] Uh then this attaches to a two-le ADU um [20:20] just to the north. [20:22] The property here is access from Still [20:24] Creek Road. In front of the garage is a [20:27] proposed driveway uh that would include [20:29] additional parking for cars um that are [20:32] outside of the garage. Across the street [20:36] of Still Creek Road, the applicant is [20:38] proposing one ADU um and that also has [20:42] its own parking area um that would be [20:44] accessed for that ADU. [20:47] The setback exception that is required [20:50] for the project is that the required [20:53] setbacks are 50 ft from all the property [20:55] lines or in this case the ingress egress [20:58] roadway easement boundary lines. [21:02] So um what you have here is you can see [21:05] this uh it shows the required 50-foot [21:09] building setback line that is typically [21:11] required and that cuts over into this [21:14] area here. Um so the areas that have the [21:17] less sleep less steep slopes tend to be [21:21] a bit outside of that area. Um so this [21:24] uh then also shows the 30-foot building [21:27] setback line. That's if the project gets [21:29] approval of a setback exception to be [21:32] closer than the 30 ft. It would actually [21:34] require a variance to the setbacks. Um [21:37] so the applicant has ensured that the [21:40] proposed development would be at least [21:43] 30 ft away in all of the areas. This [21:46] also shows here um that this corner of [21:49] the garage that would encroach past the [21:52] 50ft setback line and but still would be [21:56] uh more than 30 ft away from the [21:58] easement line and the side property [22:00] line. um the ADU across the street. That [22:04] ADU is located in an area um that's just [22:07] allowed by ADU law. Um because of the [22:10] size of it, per the conditions uh can be [22:12] as close as 4T to a side or rear [22:14] property line. [22:17] Um and so that uh is just the overview [22:20] of the location of the project and then [22:22] I'll just to show the elevations [22:26] um of the project. Uh so there's this is [22:30] the main piece of the main residence [22:33] that show kind of up the hill furthest [22:35] up the hill and then where this little [22:37] void space is this is actually where [22:39] that bridge um that hallway would [22:42] connect to the other part of the [22:43] building. So that comes across here and [22:46] connects over to this garage portion [22:49] with the J AU. So the garage at the [22:51] lower level J AU with a small little [22:54] room upstairs and this is the elevator. [22:56] Um this is the side elevation. Uh and [22:59] then this is the front elevation of the [23:02] main residence. So this is what faces [23:04] the roadway. Um this is the rear of the [23:08] main residence, the main piece of it. [23:10] And then these are the two side [23:12] elevations. And you see again that uh [23:15] hallway bridge that connects to the [23:17] garage area. Um this is just the back of [23:21] the garage JADU portion. Um again this [23:24] is that void where that hallway is and [23:27] then this is the front of that portion [23:30] of the building which is facing the [23:31] roadway. [23:33] This shows the two side elevations. [23:40] This is the portion of the attached ADU. [23:43] So this is the one furthest down the [23:45] hill um in front of the main portion of [23:47] the building. And this is the attached [23:50] ADU. Um, it has some decks uh and [23:53] balconies on the front and this shows it [23:56] from the rear. Um, so it's kind of dug [23:58] into the hillside a bit. And then this [24:01] shows the two side elevations, [24:05] these two. And then this shows the [24:08] elevations for the ADU across the [24:11] roadway. Uh, this is the elevation from [24:14] the roadway. Uh, so it's relatively low [24:17] profile, but because of the steep [24:18] hillside, it does drop down the hill. [24:21] Um, and then I'll just go through here [24:24] just briefly. The applicant has provided [24:26] some renderings of the project, so it [24:28] helps to visualize a little bit more. [24:30] And back here is the main portion of the [24:32] residence. This is that attached ADU [24:35] towards the front. [24:38] This is a bit of a different angle [24:40] showing the attached ADU. This is the [24:43] garage J ADU portion with the main [24:46] portion in the rear [24:51] and just different angles. This is kind [24:52] of the side. So main portion, the [24:55] attached ADU with the garage JDU in the [24:58] background. [25:02] Different views. This shows that hallway [25:04] bridge that uh connects the structures [25:07] that makes them attached. [25:12] Couple of other views just further back [25:14] from the road. And then this is the [25:17] views shown for the ADU that's across [25:20] the roadway. So, it's down the hillside. [25:22] Um, it would just actually be a little [25:24] bit above the roadway elevation as [25:26] viewed from the road. Um, but with that, [25:29] I'm happy to answer. Um, well, I just [25:31] want to note that you have all of uh [25:33] staff's recommended findings for [25:35] approval of the three different [25:36] entitlements and the attached draft [25:38] resolution. Um if you like I can go [25:41] through those in detail. Uh otherwise [25:43] I'm just happy to answer any questions [25:44] that you have. Um and I do want to make [25:47] one note that with our recommendation of [25:49] approval uh that there is condition 1K [25:54] and that is related to requiring a deed [25:56] restriction for the JADU. Um so when we [26:00] initially put these conditions together [26:02] for planning commission that in fact was [26:04] the law. Uh although uh just effective [26:07] this year, the state says that you can [26:10] only require a deed restriction if [26:12] there's shared sanitation facilities [26:15] with the other portion of the main [26:16] residents. Because this JADU would have [26:19] its own bathroom, um this condition [26:21] would not apply. So if the council does [26:24] accept staff's recommendation, we would [26:26] uh strike um condition 1K, noting that deed restriction is not required. [26:32] Uh but with that, I'm happy to answer [26:34] any questions that you have. [26:36] >> Okay. Thank you, Sage. Questions for [26:38] staff? [26:39] >> Um yeah, I my one question I have is has [26:43] Woodside Fire looked at the property and [26:46] given any opinion regarding whether it's [26:48] high or same or no no change in the risk [26:51] of fire. Um I don't think they've given [26:53] a risk assessment but they have been [26:55] involved in the review of the project as [26:58] well as you know over the years as the [27:02] applicant was developing the different [27:03] projects um they did work with the town [27:06] to get a permit for what we call a [27:07] vegetation management of a property and [27:10] actually I was out there with the fire [27:12] district. There was at least three [27:14] representatives of the fire district. Um [27:16] they went around and looked at different [27:18] trees and areas that should be cleaned [27:20] up. Um and the applicant then obtained a [27:23] permit and did a lot of that cleaning up [27:25] uh that the fire district recommended. [27:27] And then as far as this project goes um [27:29] as with all projects uh this gets [27:33] reviewed at a preliminary level by the [27:36] um Woodside Fire Protection District and [27:38] they did approve it with their standard [27:40] conditions. [27:41] >> Thank you. [27:43] >> Other questions? [27:48] Oh, I guess it's my turn then. uh is [27:50] this or is this not something that is [27:53] covered under the housing accountability [27:54] act there? A lot of conviction on both [27:57] sides of this uh debate right now. [28:00] What's our view? [28:01] >> It's staff's position this is not [28:03] because this is not a project that comes [28:05] before you with no request for [28:06] exceptions. [28:08] >> Okay. [28:10] And is the um there's a setback finding [28:13] around page 123 to 132 that was [28:16] submitted. Um [28:19] that something that we have either [28:20] verified or that we we believe is a [28:23] reasonable analysis or is it sort of [28:25] unverified? [28:28] It goes through every piece of history [28:30] and then every property and potential [28:33] setbacks. [28:35] So those were um findings that were uh [28:39] the applicant put forward. Um what staff [28:42] really did was focus on what staff [28:45] believe the findings to be made. We [28:47] reviewed this information. We viewed the [28:49] information from all sides. Um but our [28:51] goal is really from our professional [28:53] background and we just focused on on [28:56] recommended findings based on on how we [28:59] determined those findings to be met. [29:01] >> Okay. [29:03] Any other questions for staff? [29:08] Okay. Well, then with that, we are going [29:10] to open the public hearing. Uh, and we [29:13] welcome the appellant um and any members [29:16] of their team to make a presentation if [29:20] you would like one. And we'll certainly [29:24] going to give you as much time as you [29:25] need if you would like to make any [29:27] statement. [29:41] Good evening. Um, I think our first [29:44] speaker is going to be on Zoom, uh, [29:46] James Bransky, who, uh, designed the [29:48] project. If you could [29:49] >> Great. [29:52] Uh, okay. Well, welcome, James. [30:00] Not sure what happened. I think we just [30:02] lost him. Do you see him? There you are. [30:03] Hi. [30:04] >> Sorry. Yeah. Thank you. Um, if you don't [30:06] mind, I'd like to share my screen if [30:07] that's okay with everyone. [30:12] » I think it's okay. Yeah. [30:14] >> Okay. Here we go. [30:27] Can you see that image of the [30:30] threedimensional rendering of the house? [30:31] Is that showing up? [30:32] >> We're seeing your email. [30:35] >> Oh, my email. Well, that's not [30:36] >> Yeah. No, you don't want us to see that. [30:39] >> All right. [30:39] >> Got enough of that going on right now [30:41] around here. [30:41] >> Yeah, right. Okay. Hold on a second. Why [30:43] would that be happening? Hold on. Let me [30:45] try this again. [30:48] Um, maybe I can move the [30:52] How about Do you see the image now or [30:55] still the email? Still the email, right? [30:58] >> We don't see really anything. Yeah. [31:00] >> Let me Let me try again. I'm sorry. [31:02] >> It's okay. [31:04] >> Uh, share. [31:10] Okay, here we go. [31:13] >> There you go. [31:13] >> Got it. I see it. Okay. [31:17] All right. Um, well, thank you everyone. [31:19] I I do appreciate the opportunity to [31:23] present this project uh again. Um, [31:26] and uh uh I thought it would be uh [31:30] useful because it's been going for such [31:32] a long time. Um, and there have been so [31:35] many permutations that I thought it [31:36] would be uh uh useful to go back to the [31:39] sort of the basics of why we designed [31:41] the house uh the way we did in the first [31:43] place. And also in this presentation um [31:47] I will address some of the comments from [31:49] the report provided by the neighbors uh [31:52] forensic architect Mr. French. So I want [31:56] to start out and can you see my the the [32:00] mouse on the screen? Was I moving it [32:02] around? [32:03] >> Yes. [32:03] >> Okay, good. Okay. So, I wanted to start out by showing a three-dimensional [32:09] overview of the site to kind of give you [32:10] a a feeling for the challenges that [32:12] we've that we faced in designing this [32:15] project. Um the uh sage was kind of [32:18] pointing out uh in obviously in two [32:21] dimensions the site um the size of it um [32:24] uh the the challenging topography um and [32:28] the main road that goes through it [32:30] splits it into into about a third and [32:33] two/3 uh with the north side of the [32:35] property is the left the downs slope [32:38] side and the south side of the property [32:40] is the north the ups slope. Um there's [32:43] about 390 feet of elevation change uh [32:47] from the top of the site to the bottom. [32:49] Uh the area in gray on this on this [32:53] drawing um is in a conservation easement [32:56] and is not buildable. Um the blue fills [33:00] uh represent slopes that are over 35% [33:03] and the purple fills represent slopes [33:06] that are over 50%. Um I it it's a good [33:11] time to remember that the guidelines um [33:14] uh design guidelines generally restrict [33:17] us from building on slopes uh over 35% [33:21] and especially slopes over 50%. Um the [33:25] light blue area here um is a is an area [33:28] that is always wet because of springs [33:30] and is unbuildable. [33:32] Um the orange line um that you see here [33:36] uh that is the 50- foot setback line and [33:39] the green line um is the 30foot setback [33:43] exception line. [33:45] So generally uh what we have um is a [33:50] buildable area that's sort of inside [33:52] this red box. Um I should mention that [33:56] the downs slope area to the left um uh [34:00] will be reserved for our septic system [34:02] um with the exception of that of the [34:05] small corner up here which Sage pointed [34:07] out has a detached ADU. [34:12] Um, so there are um really really only [34:17] three buildable areas uh on the on the [34:20] south side of the road, the uphill side [34:23] to the right. Um within the 50oot [34:27] setback line. Um the first area is that [34:31] bench right there. Um the second area is [34:36] this small little corner to the north [34:38] and to the east. And then the third area [34:41] which is closest to the road um uh is [34:46] also quite small. Um the three of those [34:48] together so this would be the entire [34:51] buildable area on the south side of the [34:54] road um is 4500 square ft. [35:00] Um so that's obviously a very limited [35:02] amount of space when you're trying to [35:04] build a new home on a on such a large [35:06] site. So now if we used the 30foot um [35:11] building setback exception um the amount [35:14] of space and you can see that goes from [35:17] that that area and then up to the [35:21] 30-foot setback line. Um that amount of [35:24] space increases our buildable area up to [35:28] 7200 square ft. Still not a lot um but [35:33] just enough to build on while still [35:35] adhering to the regulations governing [35:38] steep slopes. [35:40] So here once again this is a zoomed out [35:43] but there is the three red areas that um [35:46] that we're allowed to build on. Um [35:49] so we look at at these kinds of [35:52] restrictions um as opportunities. Um [35:55] it's the tightness of these areas and [35:58] their vertical and horizontal [36:00] relationship to each other that really [36:02] informs the design. U the design [36:04] standards ask that we that the buildings [36:07] step down the hill with the terrain and [36:10] that we preserve steep slopes and trees [36:13] and that's what I think we did. [36:16] Um the building [36:19] so this is this is the design. Now, I'm [36:21] doing this without a lot of detail like [36:23] you show in the renderings, but just to [36:25] give you an idea of the massing of the [36:26] buildings. Um, the building the building [36:29] is broken down into three components. [36:31] Um, each occupying one of the red areas [36:34] were allowed to build on from the bench, [36:37] which is up here at the top. Um, the [36:40] buildings step down the hill and weave [36:43] through the trees. Um, and the uh the [36:45] main house is connected to the garage [36:48] which is which is here. [36:51] um via an enclosed bridge that travels [36:54] through a stand of redwoods. The two [36:57] components that are closest to the road, [36:59] that's the garage and then this attached [37:02] ADU [37:03] present a one-story face to the road. Um [37:07] in other words, the one-story section of [37:10] those buildings that's closest to the [37:11] road and when they step up to two [37:14] stories, those areas are further uh up [37:17] the hill and further away from the road. [37:20] The main house occupies the bench, which [37:23] is up here, um, and is elevated on [37:26] peers. So, um, we wanted to be able to [37:30] get the house to have as big a footprint [37:32] as possible in a relatively small area. [37:36] Um, like 2700 square f feet is what that [37:39] red area is up there. So, we needed to [37:41] elevate the house a little and can lever [37:44] it in in in multiple directions out over [37:47] the slopes that are the 35 and 50% so [37:51] that we could have a big enough area in [37:53] the house. And it also allowed us then [37:55] to have the rainwater [37:58] from the uphill slopes go under the [38:00] house and then be collected before it [38:03] gets down to collected and diverted [38:05] before it gets down to um the attached [38:07] ADU which is right here. [38:10] So I believe this directly addresses uh [38:14] finding number five um uh as I think the [38:17] structures are subordinate to the [38:19] natural environment um you know [38:21] responsive certainly to the site [38:23] constraints um and compatible with the [38:26] rural character of Woodside. And I [38:28] should note here that the vocabulary of of the and the materiality of the [38:34] design as you see uh in those renderings [38:36] that Sage showed you and the first [38:38] rendering that I showed you was heavily [38:41] influenced by the neighboring 95 Skywood [38:44] and 35 Still Creek. [38:47] Um it has been suggested by the [38:52] neighbors consultant Mr. French uh that [38:54] we should move the structures back to [38:57] the 50-foot setback line and you can [39:00] view that in his report. Um and as you [39:04] can see um mostly you know anything uh [39:08] beyond that 50oot setback line uh is is [39:11] mostly um uh uh a slope of 50% or [39:16] greater. So if we move the buildings [39:20] back into that 50 foot setback. So now [39:22] you can see taking uh the the main house [39:25] stays where you know up on the bench but [39:28] in order to uh uh meet the the 50oot [39:32] setback we'd have to move those [39:34] buildings back into the hillside. [39:36] Um so moving the house back to this [39:41] position will require us to obtain a [39:44] grading exception um because the amount [39:46] of excavation would be about 1645 yards. [39:51] the backs of the attached ADU and the [39:54] garage would require about a 14 foot [39:57] high retaining wall because we're [39:59] further uh into the hillside. It would [40:01] also uh unfortunately require us to [40:04] remove many mature and healthy redwoods. [40:07] All of which I think is inconsistent [40:09] with the Woodides design guidelines. And [40:12] I think it also directly addresses [40:14] finding 1B which is that the uh [40:17] available alternatives uh would uh [40:20] meaning this one would cause greater [40:21] adverse impact on natural features than [40:24] the proposed exception. [40:26] And also I think finding two which [40:28] directs us to cause no significant [40:30] impacts to the applicant's property [40:32] adjacent properties or surrounding [40:33] neighborhood and town and finding four [40:36] which directs us to cause the least [40:37] amount of disturbance to the site. [40:40] to give you a feeling for the massing [40:43] from the street. Now again, this is not [40:45] a detailed drawing, but purposely so [40:48] just to get have you get a feel for the size of the building relative to the [40:52] backdrop which is the hillside and the trees. Um so to give you a feel [40:59] of that massing um this view um which is [41:02] from the street um is which shows the [41:05] building that is is currently designed [41:07] and situated at the 30-foot setback [41:09] line. [41:10] This is the same view um but with the [41:14] building moved to the 50- foot setback. [41:16] As you can see, the visual difference is pretty minor. However, uh the impact [41:23] on the site is profound because of the [41:26] loss of trees and the additional cutting [41:29] into the 50% slope. [41:32] Here is another view. This is the view [41:35] of the rendering that I showed you at [41:37] the very beginning. [41:39] um also from the street but from the [41:41] northwest. This is the 30-foot setback [41:44] um which the 30- foot setback exception. [41:48] Here's the same view with the 50-ft [41:50] setback. Uh again, the visual difference [41:53] from the road and the impact from the [41:55] road I I believe is is relatively minor [41:58] between those two, but again the the [42:02] site impacts are are are really [42:05] significant. um and we'd love to avoid [42:08] that. [42:10] This I think also addresses finding [42:11] number three that the proposed exception [42:15] uh will cause no significant uh adverse [42:18] impact on the privacy of the neighbors. [42:20] I I don't think either one of these [42:22] situations whether the 30-foot or the [42:24] 50- foot u impact will um will have make [42:28] any real difference. [42:31] Um the next set of slides um is in [42:35] response to uh Mr. French's contention [42:38] that we've misrepresented [42:41] the size of our building because our [42:43] floor plans don't align with our size [42:46] calculation exhibit. Um so this is um [42:51] this is Mr. French's figure 50. Um, and [42:55] just before this in his report, he [42:58] states, quote, "This shall be granted [43:02] argument is predicated on the project's [43:04] total floor area, which might not apply [43:07] to the a project that provides [43:09] inaccurate data. Since the floor area [43:12] calculations do not match the physical [43:14] geometry of the floor plans, the fact [43:18] that the project is under 8,800 square [43:20] feet is unverified. [43:23] So I I believe that this statement [43:26] reflects sort of a fundamental [43:28] misunderstanding and misreading of our [43:30] floor plans and perhaps the method that [43:34] Woodside uses to calculate building [43:36] area. And let me demonstrate if you [43:38] don't mind. Uh in this figure um Mr. [43:42] French attempts to align our floor plan [43:45] with our floor area calculation exhibit. [43:48] And you can see the lines that he's [43:50] connecting between various corners of [43:53] one drawing to the other. The issue here [43:56] is that he's aligning the wrong corners [43:58] of the plan. Um on the far left, he [44:01] attempts to align the corner of our [44:04] office, which is right here, with the [44:07] edge of our exterior uncovered entrance, [44:10] uh which is this. So, um, [44:14] and the uncovered terrace, I'm sorry, [44:17] the exterior and uncovered terrace, that [44:19] does not count in the area calculation, [44:22] and therefore it's not shown in our [44:23] exhibit. He also misaligned the [44:26] northwest corner of the attached ADU [44:28] here with the exterior and uncovered [44:32] terrace in the northwest corner of the [44:34] ADU up here. I'm going to show you [44:37] those. Those are the terraces in [44:39] question. those those terraces do not [44:42] have floor uh roofs over them. So they [44:44] do not do not count in the floor area [44:46] calculation. [44:49] So just to sum this up quickly um here [44:53] is a a slide showing ADU number two. [44:57] This is uh the outline of the parts of [45:00] the building that contribute to the area [45:02] calculation. [45:04] The blue area is the uncovered terrace [45:07] with uh terrace which does not [45:08] contribute to the area calculation. [45:12] This is the area right here of the [45:14] garage and Jedu that contribute to the [45:17] building area. This is the house. These [45:20] are the areas that contribute to the [45:22] building area and these are the terraces [45:25] that do not. [45:27] Here's Mr. French's alignment. [45:31] here is the proper alignment. So, um, [45:35] and if you go to another slide, kind of [45:38] show you that those are the corners that [45:40] should be matching up. And then you can [45:42] see again that those are properly [45:44] aligned. Um, and the exhibits uh are [45:49] correct as they were originally drawn. [45:51] And therefore, our area calculation is [45:54] correct. And we are below the 8,800 foot [45:57] cap. [46:00] That is all. [46:03] >> Okay. Thank you, James. [46:06] Any other members of the team? [46:09] Yes, sir. Welcome. [46:11] >> Yeah, I'm I'm Charles Kissik with Sigma [46:14] Prime GeoSciences in Half Moon Bay. Um, [46:16] we did all the engineering geologic and [46:18] geologic work uh on this project for [46:21] several years now. And um I wasn't even [46:26] I didn't know I was going to be here [46:27] until about two hours ago. So, I have [46:28] nothing prepared. So, I'm just going to [46:29] have to wing it. [46:31] >> Uh, first of all, I I I'm extremely [46:33] familiar with the area, having grown up [46:35] on Skyway since 1966, so I know the area [46:38] very well. And um, the bottom line, I [46:44] could go into a lot of detail, but the [46:45] bottom line is the site is is stable. [46:49] There have been concerns brought up [46:51] about slope stability and uh, falting, [46:55] but there's no faulting hazard in the [46:58] air. the nearest active fault, the San [46:59] Andreas fault about a mile away. There's [47:02] a secondary [47:05] um potentially active fault about 250 ft [47:09] down the hill to the um well toward the [47:13] east toward you know down the hill and [47:16] which has no potential [47:19] uh impact on on the project. Um and then [47:23] we spent quite a a lot quite a long time [47:27] studying the stability of the site, [47:29] slope stability, working closely with [47:31] the town of Woodside and as well as um [47:34] their reviewer Cottonshers and [47:35] associates. And after going back and [47:38] forth with a lot of field work and lab [47:40] work and analyses and aer photo analysis [47:43] and all these other things with lidar [47:46] between us cottonshite and everybody [47:49] involved in this project over the last [47:51] several years we've concluded that the [47:53] uh slope stability hazard is is low. You [47:56] can never say zero in any hills anywhere [47:59] but it's very low and not really much of [48:02] a concern. [48:03] Um like I said, yeah. Um like I said, it [48:09] wasn't prepared. I'm trying to think of [48:11] what the other concerns were, but bottom [48:14] line is uh I have no no concerns [48:20] regarding future slope stability, [48:25] uh fault rupture across the site [48:28] or anything like that. So, I'd be happy [48:30] to rebut further comments in the future, [48:32] but for now, I'd like to hear what other [48:34] people have to say. Okay. [48:36] >> Great. Thank you. [48:39] >> Yes, sir. [48:40] >> Good evening. [48:42] >> Thank you so much for your time today. [48:44] Uh my name is Ryan Patterson. I'm an [48:46] attorney for the project applicants. Um [48:49] and I I first want to thank staff for [48:51] all the hard work and time that uh they [48:54] have put into this project over the [48:55] course of years now. Um, it's a lot and [48:59] I I just want you to know we appreciate [49:01] it. Um, I'm going to be speaking mostly [49:05] about the law here and why the town is [49:08] required to approve the project as [49:10] proposed with the exceptions uh as [49:13] requested. Um, to tell you just a bit [49:17] about my qualification to speak to that [49:19] topic. Um, my practice focuses on uh the [49:23] Housing Accountability Act and the new [49:26] state housing laws. Um, I believe that I [49:29] have litigated more Housing [49:31] Accountability Act and state law cases, [49:33] state housing law cases probably than [49:35] anyone else in the state. Um, and I I [49:38] say that because I want to give you my [49:39] analysis of this project and its request [49:42] for the exception. Um, and I think [49:45] you're going to hear a lot of folks [49:46] speak about the law and what it means. [49:49] uh and they may may be less familiar [49:51] with the law. Um so to start the Housing [49:55] Accountability Act Government Code [49:56] section 65589.5 [49:59] this is a law that's older than I am but [50:01] was recently amended has been amended a [50:04] number of times recently to make it [50:06] stronger and stronger. Likewise the ADU [50:09] law has been amended recently to make it [50:11] stronger and stronger and that's the [50:13] environment that we're operating in [50:14] today. Um the in short the housing [50:18] accountability act or HAA requires that [50:20] when a project meets the objective [50:23] applicable standards it must be approved [50:26] at the density proposed. So in this case [50:28] you have a single family home and three [50:30] accessory units. Um [50:34] if the project meets the applicable [50:36] objective standards and this project [50:37] does. Um, I understand and respect that [50:40] staff has taken the position that the [50:42] project does not meet all standards [50:44] because it is requesting an exception to [50:46] the setback rule. But the way this works [50:50] under state law is if the project meets [50:52] the requirements for the exception, [50:55] then the setback rule is no longer [50:57] applicable because you qualify for the [50:59] exception. This project meets the [51:01] applicable requirements for the [51:03] exception. And you've heard uh in quite [51:06] a bit of written uh briefing from the [51:08] architect, you've heard in his uh [51:11] presentation just now why it qualifies [51:13] for the exception. [51:16] Um the project meets all of the [51:19] standards. And how do we know that? [51:20] Well, first it is deemed compliant by [51:23] operation of law. Under the Housing [51:26] Accountability Act, uh a city or county [51:29] has 30 days to decide and notify the [51:32] applicant if the project is compliant or [51:34] not compliant after the project is [51:37] complete. After the application is [51:38] complete, in this case, uh the project [51:42] was deemed complete by law on December [51:44] 9, 2024 and confirmed in writing by [51:47] staff. uh the town did not provide an [51:51] inconsistency determination [51:53] uh within 30 days or by January 9, 2025. [51:57] The consequence of this is [52:00] final and certain under law the project [52:03] does comply with applicable [52:05] requirements. Um even if it didn't in [52:08] reality, the law says it does, but [52:10] thankfully in this case it actually does [52:12] meet the requirements. Um, and I note [52:15] that many of the standards are not [52:16] actually objective. Um, and I'll I'll [52:19] speak to that just briefly, but remember [52:21] it has to meet the applicable objective [52:23] standards here. The requirements for the [52:25] exception are largely subjective rather [52:27] than objective and therefore not [52:30] actually required under law. Um, so for [52:34] example, finding number one, no [52:35] conforming alternatives or alternatives [52:38] will cause greater environmental damage. [52:40] Um there's several terms that are not [52:43] actually defined in the code um and are [52:45] not as state law says quote uniformly [52:48] verifiable by reference to an external [52:51] and uniform benchmark or criterion [52:54] available and knowable by both the [52:56] development applicant or proponent and [52:58] the public official before submitt. [53:02] It's for that reason that a lot of [53:03] cities have been moving away from these [53:05] types of standards in recent years to [53:07] make them more objective, more concrete, [53:10] more defined. These are kind of an older [53:14] uh relic of the past the way that [53:16] they're phrased. And in some cases, they [53:19] may still apply to projects, but in this case, not. Uh finding number [53:24] two, no objective criteria uh to define [53:28] a significant environmental impact. the [53:30] applicant can't know if it if it meets [53:33] that standard or not in advance. Um, [53:36] finding number three, the exception will [53:38] cause no significant adverse impact on [53:40] the privacy of neighbors. We don't have [53:43] objective criteria in the municipal code [53:45] to explain what a a significant privacy [53:48] act uh impact on neighbors is. Now, this [53:51] project does not, for the record, have a [53:53] significant privacy impact. Uh, in fact, [53:56] this has been designed so that it's [53:57] pulled away as far as it can be. It's [54:00] through heavily wooded terrain, sloped [54:02] terrain. Um, you can't see the neighbors [54:06] from this project and the neighbors [54:08] cannot see the houses that are proposed [54:10] here. There's literally no privacy [54:12] impact. Um, you have in your packets a [54:15] visual study showing uh line of sight [54:18] from the project site to each [54:20] surrounding neighbor and all you can see [54:22] is trees. you you can't see the [54:24] neighboring houses. Um neighbors have [54:26] claimed that there will be a privacy [54:28] impact because they will drive by the [54:30] houses and look at the houses as they [54:32] drive by for approximately 5 seconds [54:35] that it takes to drive past. [54:37] It's not a privacy impact to drive by [54:39] and look at someone's home. Um or the possibility that someone sitting in [54:44] her house might look out at the road at [54:46] just the precise moment someone drives [54:48] by. That's not a privacy impact on the [54:50] car. and to tell this family that they [54:53] can't build a home uh because someone [54:55] might drive by and look at them, look at [54:57] their house for five seconds as they [54:58] drive past. [55:00] We all have homes that look at roads uh [55:02] and roads that can see our homes as they [55:04] go by. That's just not how it works. [55:08] Um additionally, [55:11] uh I mean some of these things like [55:13] consistent with the spirit and intent, [55:15] goals and objectives of the general [55:17] plan, this is this is textbook [55:19] subjective. Um, so these things don't [55:22] apply, but we mean it anyway. Um, as you [55:24] have at some length briefed in your [55:27] packets. [55:29] Next, state ADU law actually prohibits [55:32] imposing additional setback [55:34] requirements. It's a 4-oot setback [55:36] requirement. We are well past a 4oot [55:38] setback. That's state law. Um, and we're [55:42] giving as much setback as possible. [55:45] Next, the junior accessory dwelling unit [55:48] is being proposed as a with a setback [55:51] under disability law. This is a [55:53] requested disability accommodation under [55:55] the Americans with Disabilities Act and [55:57] comparable state law. Um, they have [56:00] family members with mobility impairments [56:02] who are going to be aging in place here [56:04] who need to be cited in this location so [56:07] that the garage is accessible from the [56:09] road and the building is attached to the [56:11] garage. their home has to be accessible [56:14] with an elevator from that garage cited [56:17] at the road location. Um, this is this [56:20] is federal and state law. Uh, it goes [56:23] beyond simply the zoning code. [56:30] Now, turning back to um kind of the [56:34] bigger picture, [56:36] the town's housing element [56:39] committed in program H6.2 2. C uh by the [56:44] end of 2025 to change the setback [56:47] requirements. The town is committed to [56:50] change uh from the nor the the current [56:53] 50- foot requirement to the Woodside [56:55] Glenn's model uh with reduced setbacks. [56:58] It committed to do that by the end of [57:00] last year. The town is in violation [57:02] currently of its housing element [57:04] commitment to the state. And for the [57:07] town to then deny an exception that [57:09] allows a home to be built in general [57:12] conformity with that commitment. [57:14] I mean that that's a that's something to [57:17] be careful of. uh HCD, the housing and [57:20] community development department, has [57:22] authority to revoke uh housing element [57:25] compliance, which would subject the town [57:28] to the builder's remedy, meaning that [57:30] none of the local zoning standards apply [57:32] and people can build big buildings [57:35] basically wherever they want. Uh there [57:37] are there are major financial penalties, [57:40] monthly, massive financial penalties uh [57:43] that could apply loss of funds from the [57:45] state and there are a lot of bad things. [57:47] We don't we don't want the town to go [57:49] out of compliance with the housing [57:50] element. So I think for that reason it's [57:52] important to show the state that even if [57:54] the town has not complied with that [57:57] obligation by the date they said they [57:59] would, they're at least honoring it in [58:01] spirit with I think the first project to [58:04] come along to ask uh about that [58:06] qualification about that setback [58:08] requirement [58:11] beyond HCD even to the project [58:13] applicants to this family. If the [58:17] exception is not granted and the [58:19] requirement is you have to build on a [58:22] 50-ft slope, you have to do massive [58:23] amounts of excavation and retaining [58:25] walls, you have to cut down significant [58:28] redwood trees and a significant number [58:30] of significant redwood trees. If that's [58:32] what the town is going to tell this [58:33] family tonight, [58:36] that is infeasible for them to build. If the town is going to tell them they [58:40] can't position their their parents' [58:43] home, the JADU, in a location that is [58:46] accessible to them with mobility [58:48] impairments, it's not a feasible [58:50] project. And the consequence of denying [58:53] a feasible a project, rendering it [58:56] infeasible in this way, is significant [58:58] financial penalties. If there were a [59:00] Housing Accountability Act lawsuit, we [59:03] would be looking at $50,000 per unit in [59:07] addition to the attorney's fees, which [59:08] would probably even dwarf that amount in [59:11] addition to the town's own attorney's [59:12] fees. Um, so it's, you know, it's it's [59:15] not an inconsequential thing. Um, again, [59:19] I appreciate staff has really grappled [59:20] with these issues and I think found a [59:22] good solution. Uh, we we do have some [59:25] issues with a couple of the conditions [59:27] which you'll hear from the applicant. Uh [59:29] but the project itself is a good one and [59:32] it is sensitively located to minimize [59:34] environmental impact and impact to the [59:36] neighbors. Thank you very much. [59:38] >> Thank you. [59:42] » Any other members of the team? Kristen [59:45] or David? [59:46] >> Hi Kristen. Welcome. [59:50] >> Yeah. [59:54] » Good evening Mayor and council members. [59:56] I'm afraid I left the blue hats at home [59:59] for the opposing team. I won't take too [1:00:01] much time to speak, particularly on the [1:00:03] technical and legal basis for our [1:00:05] appeal. Indeed, there is a tome of [1:00:07] documents that speaks to that rivaling [1:00:10] my organic chemistry textbook from [1:00:12] college in its length. Instead, I will [1:00:14] speak the same message that I began this [1:00:16] process with in 2019. Put simply, I want [1:00:19] to build a house for my family on my [1:00:22] property, and I want to build housing [1:00:24] for those who could not otherwise afford [1:00:26] to live in the area. The family who [1:00:28] intends to inhabit this house, hopefully [1:00:30] for many years to come, includes my [1:00:32] in-laws, John and Nan. We have all been [1:00:35] living together since 2020, building the [1:00:37] village that people talk about when it [1:00:39] comes time to raise a family. Elements [1:00:41] of the design are specifically there to [1:00:43] accommodate the mobility needs of my [1:00:45] family. They are not optional fat to be [1:00:48] trimmed off on the whims of neighbors. [1:00:50] The additional housing that we can build [1:00:52] is a way to keep valued members of the [1:00:54] community here. People who cannot afford [1:00:57] to purchase a property but nonetheless [1:00:59] are rooted here. Teachers, retirees, [1:01:02] craftsmen, people deserve the [1:01:05] opportunity for and the dignity of [1:01:07] housing. Furthermore, our inclusion of [1:01:09] those units was a response to the town's [1:01:11] directive to create housing through [1:01:13] ADUs, not condominiums. [1:01:16] Fundamentally, we come before the town [1:01:18] council to ask for relief, a difference [1:01:20] of approximately 20 ft from where the [1:01:22] building is cited. This makes no [1:01:25] material difference in how the building [1:01:26] appears from the road. A road which is [1:01:29] private, [1:01:30] which is owned by us, with only two [1:01:33] houses beyond. I find it astonishing [1:01:35] that a family house with additional [1:01:37] allowable units has garnered so much [1:01:39] ugliness and to be sure public comment [1:01:42] for this project might be best described [1:01:44] as a crucifixion in 26x. [1:01:47] The only project that has come before [1:01:48] the town's decision-making bodies for [1:01:50] building that has drawn more commentary [1:01:53] and public input has been Roberts and [1:01:55] Bucks. The burdens of proof put upon us [1:01:58] are magnitudes greater than any [1:02:00] equivalent project. I am grateful that [1:02:02] the council will hear this appeal [1:02:04] tonight examining the facts in front of [1:02:06] them. Denovo, thank you very much. [1:02:09] >> Thank you, [1:02:12] David. [1:02:25] Like the only one that has to adjust the [1:02:26] mic. [1:02:33] Council members, over the last 18 [1:02:35] months, some have questioned my [1:02:37] character and others have raised [1:02:38] concerns about my ethics. Facts have been twisted. History has [1:02:47] been revised. Tonight, I ask you to [1:02:50] reflect on my record of service. Trust [1:02:52] is demonstrated through actions, not [1:02:54] just words. [1:02:56] I have taken the oath of office four [1:02:58] times. [1:02:59] to serve both our country and this town. [1:03:02] I have taken the oath of office three [1:03:03] times after 911, during Operation During [1:03:06] Freedom, most recently as a naval [1:03:08] officer. [1:03:10] I swore to serve witside with integrity, [1:03:12] fairness, and transparency, upholding [1:03:14] the general plan and ordinances. [1:03:18] Both both call for true faith and [1:03:20] allegiance, holding me to high standards [1:03:22] of honor and integrity. [1:03:25] I am guided by the Navy's core values, [1:03:27] honor, courage, and commitment. These [1:03:29] values inform all of my decisions and [1:03:31] actions. Sailors are accountable for [1:03:33] their actions and are expected to serve [1:03:35] with integrity, taking full [1:03:37] responsibility, and keeping their word. [1:03:39] That includes my promise of building a [1:03:41] house for Kristen on the property that [1:03:43] our family has owned for over 50 years. [1:03:48] We act in the nation's best interest, [1:03:49] upholding high standards and using [1:03:51] entrusted resources honestly and [1:03:53] efficiently. [1:03:55] My position requires a 10-year [1:03:57] background investigation and continuous [1:03:59] polygraphs. [1:04:02] I strive for positive change and [1:04:04] improvement. That's why I attended every [1:04:06] council hearing on the housing element [1:04:08] to understand the council's goals when [1:04:11] updating the general plan. Tonight, I [1:04:13] appear before you as someone who abides [1:04:16] by the Navy's core values and has earned [1:04:18] the Navy's trust and yours. This council [1:04:22] also unanimously selected me to serve [1:04:24] Woodside by appointing me to the ASRB. [1:04:27] This is who I am. My words and actions, [1:04:30] both here and elsewhere, show my [1:04:32] commitment to service, integrity, and [1:04:33] the trust you have placed in me. [1:04:36] So, trust the words I say and trust the [1:04:39] words of my team. [1:04:43] This project has evolved through [1:04:44] multiple conceptual reviews and design [1:04:46] updates over the past 18 months. [1:04:48] We began initially planning in early [1:04:50] 2019 and submitted our first conceptual [1:04:52] review in 2020. Through ongoing [1:04:55] feedback, we updated the designs and [1:04:57] setbacks periodically, making the most [1:04:59] recent revisions in July 2025 to comply [1:05:02] with the town code, town goals, and [1:05:04] state law. [1:05:06] Unfortunately, by pushing the attach as [1:05:09] far back as possible while still staying [1:05:11] out of 35% slopes, we had to give up our [1:05:14] goal of not cutting down any healthy [1:05:17] significant redwood retreats. [1:05:19] Woodside is committed to meet state [1:05:21] housing requirements mainly through ADUs [1:05:23] as specified in the housing element. Our [1:05:25] project four units on 10 acres includes [1:05:28] two ADUs, one JADU aligns with the [1:05:31] town's preference with for low density [1:05:34] ADU focused growth. [1:05:37] I have firsthand experience with fire. [1:05:40] From my time as a volunteer firefighter [1:05:42] and from damage control training in the [1:05:44] Navy. While I was underway, there was a [1:05:46] fire on my ship. [1:05:48] Excuse me, my boat. I was a Submariner. [1:05:52] We are acutely aware of the fire danger [1:05:54] in the area, which is why we developed a [1:05:56] vegetation management plan independent [1:05:58] of this project in 2024 and have gone [1:06:01] above and beyond the requirements of [1:06:03] today's fires safe building code. As Jim [1:06:06] can attest, I have not budged on the [1:06:08] self-imposed requirements, including [1:06:10] exterior walls for the two-hour fire [1:06:12] rating and exterior fire sprinklers, a [1:06:16] system credited with saving over a dozen [1:06:18] homes in the Palisades fire. [1:06:25] Last September, I spoke about our [1:06:26] dedicated staff and noted that only four [1:06:29] positions pay at or above the county [1:06:31] median income for a family of four. [1:06:35] In both the Woodside and Molen Valley [1:06:36] school districts, the pay tables don't [1:06:38] even list the median family income. Many [1:06:41] town staff commute from places like San [1:06:43] Francisco and Half Moon Bay. Our son's [1:06:46] teacher drives in from Hayward every [1:06:49] single day. [1:06:51] If you review the minutes from our first [1:06:53] ASRB meeting hearing in 2020, you'll see [1:06:56] we always discuss bringing affordable [1:06:58] housing to Woodside through this [1:06:59] project. Our goal has always been to [1:07:02] provide homes for fixed income seniors [1:07:03] like my parents, teachers, first [1:07:05] responders, students, veterans, and [1:07:08] others who serve our community through a [1:07:09] missing middle housing project because [1:07:11] that's what this is. We specifically [1:07:14] designed two units to be accessible for [1:07:16] those with dis with with disabilities. [1:07:19] Our project is listed first as an [1:07:22] affordable housing pipeline project in [1:07:24] the housing element on page G10 [1:07:27] adding two units of very lowincome [1:07:29] housing. This proposal achieves the [1:07:32] outcome described in the adopted housing [1:07:34] element. When the, as Kristen said, when [1:07:37] the town approved four ADUs on large [1:07:39] parcels, we included two more ADUs in [1:07:41] our master plan, which the ASB had [1:07:44] already approved in 2021 [1:07:47] as we and we were preparing for formal [1:07:49] design review. We did this because we [1:07:51] felt it was our civic duty to help the [1:07:53] town achieve its housing goals through [1:07:54] ADUs rather than multifamily buildings. [1:07:58] Despite the approved part of the project [1:08:00] having no material changes, which is the [1:08:02] part ironically you are looking at for a [1:08:06] setback exception, [1:08:08] submitting the master plan for the [1:08:09] property as the town encourages started [1:08:12] a second conceptual review process over [1:08:15] a year ago. The detached ADUs are at [1:08:18] that we added aren't even up for [1:08:20] discussion since they are only part of [1:08:22] the application for ministerial review. [1:08:25] Unfortunately, when the town passed the [1:08:27] ordinance relaxing the downhill plate [1:08:29] height for ADUs on downhill slopes, we [1:08:32] did not we I include myself in that. I [1:08:34] was at those meetings did not account [1:08:36] for a split level structure with two [1:08:38] ADUs in the same footprint. [1:08:41] Something that is achievable on a [1:08:42] downhill slope while maintaining the [1:08:44] one-story uphill plate height. So to [1:08:47] eliminate the variance that that second [1:08:48] ADU would require, we removed it. [1:08:54] Ryan talked about the housing program [1:08:57] that we have failed to accomplish. [1:08:59] We are in this meeting today in 2026 [1:09:02] because [1:09:04] we didn't do it and that delay has force [1:09:07] applicants like us to seek hearings like [1:09:09] this and relief that should already be [1:09:10] handled administratively. [1:09:12] Our project would comply with the town's [1:09:14] 30-foot setback requirement for Woodside [1:09:16] Glenns, but it was not adopted in the [1:09:18] Western Hills promise. [1:09:22] There's a question about whether the HA [1:09:24] applies in a single family home. Staff [1:09:26] has an opinion. Ryan has an opinion with [1:09:29] a quote from the HCD technical advisory [1:09:32] in their FAQ section. Does the Housing [1:09:35] Accountability Act apply to an [1:09:36] application that includes both single [1:09:38] family resident residence and an [1:09:41] accessory dwelling unit? Yes, since an [1:09:44] application for both a single family [1:09:46] residence and an ADU includes more than [1:09:49] one residential unit, the HAA applies. [1:09:54] As such, it is protected from denial [1:09:56] unless a preponderance of evidence shows [1:09:58] that a specific adverse health or safety [1:10:01] impact cannot be mitigated, and there's [1:10:04] none that exists for our project. [1:10:08] Some have argued that our project does [1:10:09] not meet local objective standards [1:10:11] because the zoning code requires us to [1:10:13] request an exception. However, the [1:10:16] zoning code does not match the general [1:10:18] plan. In other words, it is not [1:10:20] vertically consistent with the general [1:10:22] plan, a situation considered in the [1:10:25] housing accountability act. Our housing [1:10:28] element calls for updating the western [1:10:30] hills outdated rules to align with the [1:10:32] Woodside Glenn template. Before [1:10:34] incorporation, the western hills were [1:10:35] subject to San Antonio County's much [1:10:37] more relaxed setback standards of 25 [1:10:40] feet in the front, five feet on the [1:10:41] sides, and 20 feet in the back. [1:10:44] And that's why most of the Western Hill [1:10:46] properties don't meet today's standards, [1:10:49] including those in the vicinity of Still [1:10:51] Creek. These differences show [1:10:56] why vertical consistency in the housing [1:10:58] accountability act matters. Local [1:11:00] decisions much must match local policy. [1:11:03] housing goals and state law. This [1:11:05] protects the housing goals you set in [1:11:08] the general plan. [1:11:17] Our project is located on a private road [1:11:19] that we own and over which our neighbors [1:11:22] have easements. These properties, three [1:11:25] properties have rightway easements [1:11:26] across our land and building site, while [1:11:28] others have implied easements on parts [1:11:30] of Sopre Road that do not cross the [1:11:32] building site. And none of the HOA [1:11:34] members behind me have easements on that [1:11:36] road. [1:11:38] We have held multiple Zoom calls, [1:11:40] sitewalks, and kitchen meetings to [1:11:41] discuss the project with Still Creek [1:11:43] neighbors. Despite contrary claims, many [1:11:46] Skyrimacres neighbors have expressed [1:11:48] concern about this project. But those [1:11:50] concerns only emerged after our Steel [1:11:52] Creek neighbors determined, as quoted [1:11:53] from an ASRB meeting, that their private [1:11:56] forest should remain undisturbed. [1:12:00] Project opponents argue we should have [1:12:02] reached out to them because they reside [1:12:03] in the surrounding area. Yet, they [1:12:05] argued Skyward Acres wasn't the [1:12:07] surrounding area. At the planning [1:12:09] commission meeting, [1:12:11] the planning commission decided that the [1:12:13] surrounding area consisted only of the [1:12:14] homes on the parcel map for Still Creek [1:12:16] Road, not all those in Skyward acres. [1:12:20] But this is the first time across the [1:12:22] entire 17-year record of the current way [1:12:24] we grant setback resolutions that a [1:12:27] project was redefined [1:12:30] based on the recorded parcel map as a [1:12:33] reference to exclude identically zone [1:12:35] adjacent lots. the first time. [1:12:39] If the planning commission had accepted [1:12:41] the surrounding area encompassed by [1:12:43] Skyward Acres as it as it has [1:12:45] historically by looking at properties [1:12:47] within a quarter mile radius, Finding 1C [1:12:50] would have been supported by the pattern [1:12:51] of development as many of the homes in [1:12:54] Skyward Acres do not comply with the [1:12:55] current 5ft setback requirements because [1:12:58] they were built when they were part of [1:12:59] the county. [1:13:02] But looking at Steel Creek on its own, [1:13:04] every house has some nonconformity, [1:13:06] whether it's setbacks, slopes, or [1:13:08] variances. 105 Sunrise, three Still [1:13:11] Creek, 35 Steel Creek, and 95 Skyward [1:13:14] all have setbacks that are less than 50 [1:13:17] ft. 95 Skyward is built in the slopes [1:13:20] greater than 50% slope. [1:13:24] I never found the variance for that. [1:13:27] Seven and 45 Still Creek have driveway [1:13:29] exceptions and 45 Still Creek was built [1:13:31] on an active landslide. [1:13:33] Our request is consistent with [1:13:35] long-standing precedent in the area. The [1:13:38] question before you is simple. Are we [1:13:40] entitled to build our house in the front [1:13:42] step? Are we entitled to some relief for [1:13:45] our challenging lot like our neighbors [1:13:48] have enjoyed relief? It's a question of [1:13:50] entitlements. It's that simple. [1:13:56] Given all this, denying our project over [1:13:58] setbacks would be unfair and counter to [1:14:01] the goals of the housing element that we [1:14:04] set in our housing element. Our proposal [1:14:06] fits the neighborhood is supported by [1:14:08] the housing element and request relief [1:14:10] only for setbacks. If the town had [1:14:13] already updated setback standards as [1:14:15] planned as promised to HCD, no exception [1:14:18] would be needed. [1:14:19] This room behind [1:14:21] the crowd behind me reminds me of the [1:14:24] crowd that you had during the housing [1:14:26] element and the upzoning meetings we had [1:14:28] for the three high density areas in [1:14:30] town. As a veteran and current naval [1:14:33] officer, I have always looked for ways [1:14:35] to serve our community as a civilian. [1:14:38] Tonight, our shared mission is to turn [1:14:40] the town's housing vision into action. [1:14:42] This project fulfills those values and [1:14:44] advances our commitment to the public [1:14:46] and the state. I urge you to stand by [1:14:49] your promises and approve this project [1:14:51] tonight and allow us to provide much [1:14:53] needed housing for our community. [1:14:55] Thank you. [1:14:57] >> Thank you, David. [1:15:01] Does that conclude? Okay. Thank you. Uh [1:15:05] any questions for the appellent? [1:15:11] » Sir, [1:15:12] >> this one is for um Mr. Patterson. Thank [1:15:15] you for your presentation. and it was uh [1:15:17] very helpful. [1:15:19] >> Um can you go over the um [1:15:22] the state ADU and setback you you had [1:15:25] referenced it there that some new and [1:15:28] it's highly relevant to this project of [1:15:30] course. Could you go through that again? [1:15:32] I want to make sure I heard you [1:15:33] correctly. [1:15:35] >> So [1:15:39] » thank you. I'm not that tall. Uh thank [1:15:42] you. Yes. I I believe I mentioned that [1:15:45] state ADU law has gotten more and more [1:15:47] restrictive over the last few years. Um [1:15:50] specifically with regard to setbacks, it [1:15:54] is a 4-foot setback side and rear [1:15:56] setback. Uh towns are not allowed to [1:16:00] require greater than a 4ft setback. U [1:16:04] and that's that's the law on ADUs. [1:16:07] So talk. So how so okay and obviously in [1:16:11] this particular case it's greater than [1:16:13] four feet this the setback. So is that [1:16:16] the position you're standing on on this [1:16:18] one? I mean there's other rationale that [1:16:20] you've mentioned too. [1:16:21] >> Right. Well there there are a number of [1:16:23] different reasons why uh the applicant [1:16:25] is entitled to a setback exception. Uh [1:16:28] but as it relates to ADUs uh those [1:16:32] setbacks should not apply at all. So it should be a 4 foot setback [1:16:37] requirement. [1:16:39] >> Thank you. [1:16:40] >> Yeah. Thank you. [1:16:41] >> I wondered if I had heard it correctly [1:16:42] and I did. Okay. [1:16:43] >> Okay. [1:16:44] >> Any other questions? [1:16:48] >> Just one technical one. Uh for me, how wide is the uh the front ADU uh the [1:16:54] main ADU along Still Creek Road and [1:16:56] trying to think about that relative to [1:16:58] the side the length of the property [1:17:00] line. [1:17:03] trying to think of the relative [1:17:04] encroachment if you will. Uh [1:17:08] >> give me one second. [1:17:10] >> I'm sorry to probably should have [1:17:12] >> the length of the length. [1:17:14] >> Yeah, length. [1:17:15] >> I can give you that, David. [1:17:18] >> Perfect. Shame down to it. [1:17:19] >> Yeah. So, give me one second here. [1:17:24] So the length of that ADU overall length [1:17:28] is [1:17:30] um [1:17:33] 48 foot 9 in [1:17:36] um [1:17:38] from left from uh east to west. [1:17:42] Yeah. [1:17:43] >> So [1:17:43] >> and would you would you happen to know [1:17:45] the length of the property line along [1:17:46] Still Creek? Well, the overall length of [1:17:49] the property line on Steel Creek, I can [1:17:51] give you a general feel for the length [1:17:53] of that. Um, hold on a second. Let me [1:17:56] just get to the right file here or the [1:17:58] right spot. [1:18:04] Uh, overall that dimension across there [1:18:08] is about 422 feet. [1:18:12] >> Okay, [1:18:13] >> it's actually longer than that, but that [1:18:14] that's a straight shot. Um, left to uh [1:18:17] east uh west to east 422 ft. [1:18:20] >> Okay. Yes, [1:18:23] >> Jim. Does that include the panhandle [1:18:25] road frontage? [1:18:29] » Oh, you mean all the way up the road? [1:18:32] No, that doesn't include that. That's [1:18:34] just the that's just the main part of [1:18:36] the lot. [1:18:39] >> Okay. Other questions? [1:18:45] Um, and just just out of curiosity, um, [1:18:50] if if you were to be pushed back to the [1:18:52] 50 ft, the grading, the tree removal, [1:18:56] the retention wall, the design cost, [1:18:59] what do you have a general sense for [1:19:01] what that what is the cost in in in [1:19:04] dollars and time? Would you have a sense [1:19:06] for that? [1:19:11] Maybe I'm looking at you, Jim, probably [1:19:12] as the expert. [1:19:13] >> Okay. Um, [1:19:16] well, it's multiple tens of thousands of [1:19:18] dollars. Um, not to mention the fact [1:19:20] that we lose uh trees that we will never [1:19:24] recover, obviously. Um and uh and you [1:19:28] know and we're you know philosophically [1:19:31] we're we're you know we're kind of [1:19:33] destroying parts of the site that we we [1:19:35] would we would prefer to um to preserve. [1:19:39] >> Um so but yeah I mean it would be you [1:19:42] know in in the upper tens of thousands [1:19:45] of dollars I'm sure. [1:19:46] >> Okay. [1:19:48] >> Well there's a better estimate. [1:19:51] >> Okay. [1:19:53] Um yeah, as as a a engineering geologist [1:19:57] who gets who's involved in construction [1:20:00] quite a bit, considering uh 14t [1:20:03] retaining walls, all the extra cubic [1:20:05] yardage, the trees, everything else, [1:20:08] there's always a wide range, but the [1:20:10] number that came to me would be $250,000 [1:20:14] because [1:20:15] >> these tall retainable walls get very expensive. [1:20:18] >> Right. Okay. [1:20:20] >> Thanks, Charles. [1:20:22] Architects always underestimate. [1:20:27] » Good moment of levity. Uh any other any [1:20:30] other questions from uh councel? [1:20:34] Okay. Thank you. Um so we're going to [1:20:37] move to public comment and we all did [1:20:39] have a chance to watch the planning [1:20:41] commission meeting. Uh and we understand [1:20:43] that there's an accepted parliamentary [1:20:45] procedure that you'll be using tonight [1:20:46] to sequentially link your argument. And [1:20:49] uh we have been told that we will be [1:20:51] honoring that tonight. Um the only rule [1:20:54] that we have is that you can seed your [1:20:55] time to the next person, but it it [1:20:57] doesn't aggregate. So uh you can give [1:20:59] the time you have left to the next [1:21:01] person, but there's no sort of [1:21:03] aggregation at the end, if you will, to [1:21:05] say we still have 12 minutes or [1:21:06] something. We're going to try our best [1:21:07] to keep up with what's going on. Um, and [1:21:11] also we've received literally hundreds [1:21:14] of pages in the last 24 hours and a lot [1:21:17] of it in the last two hours. So if [1:21:20] you've submitted a comment, we want to [1:21:22] hear from you tonight. So make sure that [1:21:24] you do speak to this tonight if you have [1:21:26] if you're one of the many people that [1:21:28] have submitted from that that book. And [1:21:32] um the other thing we're going to do [1:21:33] just before we start, we're going to go [1:21:34] to the Zoom room first because we know [1:21:36] when we start the sequential thing, it's [1:21:38] going to be like an hour long. So, um, [1:21:39] we do have one hand raised in the Zoom [1:21:41] room. So, uh, Jordan Grimes. We're going [1:21:44] to ask if you'd like to make a comment. [1:21:46] >> Oh, great. Thank you so much. Uh, good [1:21:49] evening everyone. My name is Jordan [1:21:50] Grimes. I'm a member of Peninsula for [1:21:53] everyone. We are a, uh, grassroots [1:21:56] housing advocacy group here, uh, in Sano [1:22:00] and Santa Clara County. We wanted to [1:22:02] speak in support of the project this [1:22:04] evening. Um, I think the project [1:22:07] applicants did a tremendous job of [1:22:10] articulating the benefits of the project [1:22:12] and and the concerns. Um, sort of [1:22:15] dispelling the the issues around it. Um, [1:22:20] I guess I'll just say this. Woodside has quite obviously been in the news uh [1:22:25] a lot over the last couple years uh with [1:22:28] regard to housing, particularly around [1:22:30] the housing element, uh particularly [1:22:33] around uh its creative interpretations [1:22:37] of state law and how it applies to the [1:22:40] town. Um I, you know, would suggest [1:22:46] that you maybe not take the path that [1:22:48] you have pursued previously. [1:22:51] um in creatively interpreting state law. [1:22:54] I think the law pretty clearly here uh [1:22:57] allows this project. Um the housing [1:22:59] accountability act is is clear. Uh the [1:23:03] ADU laws are clear. Um and [1:23:07] it would be it would behoove you not to [1:23:10] challenge um uh the effectiveness and [1:23:15] the applicability of state laws the way [1:23:16] that you have in the past. um they do [1:23:20] apply. Uh they, you know, there's nothing that would preclude them [1:23:24] from applying in the town of Woodside. [1:23:27] Um I also just want to say as a lifelong [1:23:30] resident of this county, um and as [1:23:32] someone who will never ever be able to [1:23:34] afford to live in Woodside, um you have [1:23:37] people that you need uh who cannot [1:23:39] afford to live in your town. You have [1:23:40] teachers, uh you have store clerks, uh [1:23:43] you have many other people who will [1:23:46] never be able to afford to live in Woodb [1:23:48] um if not for projects like this that [1:23:51] provide units uh that would allow them [1:23:53] to do so. Um when you choose not to [1:23:57] build housing for those people, you put [1:23:59] that burden directly on nearby [1:24:01] communities like Redwood City, San [1:24:03] Mateo, uh Menllo Park, etc. Um, I would [1:24:07] encourage you to do your duty to do what [1:24:10] I think all of you know is right um and [1:24:13] approve the project uh and allow more [1:24:18] people to live in Woodside. Thank you so [1:24:21] much for your time. [1:24:24] >> Okay, thank you Jordan. Any other [1:24:26] comments from the Zoom room before we go [1:24:27] to Independence Hall for the a bit? [1:24:31] Okay, seeing none, uh we are open for [1:24:35] public comment at Independence Hall. [1:24:43] » Good evening. Welcome. [1:24:44] >> Uh my name is Bruce Bastl [1:24:47] and uh I my wife and I, Patricia, live [1:24:51] at uh 105 Sunrise Drive at the [1:24:54] intersection of Still Creek. We have for [1:24:57] 50 years and we count on u uh Kristen's [1:25:03] mom and dad as friends and neighbors. Uh [1:25:06] I'm [1:25:09] transmitting to you uh some comments [1:25:12] from a concerned neighbor specifically [1:25:15] related to the recent submissions that [1:25:18] you have here. So [1:25:21] the comments are good evening before the [1:25:23] council reaches the merits we need to [1:25:26] make a process record. Applicants have [1:25:29] submitted 342 pages today. If I can [1:25:33] repeat that applicant has res submitted [1:25:36] 342 pages today literally on the day of [1:25:40] the hearing. After 5 years of [1:25:42] proceedings that kind of lastm minute [1:25:44] filing is not fair process. It [1:25:47] deprivives the public, the neighbors, [1:25:50] and frankly the council itself from [1:25:52] meaningful opportunity to review and [1:25:55] respond. We would like a decision [1:25:58] tonight. Let me be clear about that. [1:26:01] More than 50 families have lived under [1:26:04] this dispute for years. We are entitled [1:26:07] not only to finality, but to a response. [1:26:10] The current design remains [1:26:13] non-compliant, dangerous, and [1:26:14] unresolved. It continues to threaten our [1:26:18] safety, our neighborhood, and even the [1:26:21] insurability of our homes. So, we are [1:26:24] not asking for delay as a tactic. But [1:26:28] finality must be fair finality. [1:26:31] If the council cannot disregard the [1:26:33] applicant's last minute filing or [1:26:35] determine that it does not change the [1:26:37] required findings, then the council [1:26:40] should proceed tonight. affirm the [1:26:43] planning commission and deny the appeal. [1:26:47] But if the council members believe the [1:26:49] applicant's 342page [1:26:52] submission may matter or believes it [1:26:55] must be digested before deciding, then [1:26:58] fairness requires a continuence. The [1:27:01] public cannot be ambushed on the day of [1:27:04] the hearing and then told that its [1:27:06] silence or incomplete response means the [1:27:10] new material is accepted. The code [1:27:13] requires the council to decide whether [1:27:15] every required finding can be made. That [1:27:19] decision should be based on a fair [1:27:21] record, not a document dump at the last [1:27:25] minute. So our position is [1:27:27] straightforward. Decide tonight if the [1:27:29] council can do so on the existing record [1:27:33] and deny the appeal, but do not reward [1:27:36] the applicant's ambush by re relying on [1:27:41] same day materials and the community has [1:27:45] had no meaningful chance to review. If [1:27:48] the town proceeds while crediting these [1:27:51] materials, it should be clear in the [1:27:53] record that the public was denied a fair [1:27:56] opportunity to respond. Thank you for [1:27:58] your consideration. [1:28:00] >> Thank you. [1:28:05] For the record, is that from David [1:28:06] Madrid? [1:28:07] That letter? [1:28:09] >> No. [1:28:11] >> Who's who's the letter from that you're [1:28:13] reading? [1:28:16] >> Yeah. [1:28:17] David M. [1:28:18] >> Yeah, that's a thought. Okay, thank you. [1:28:23] » Yes, John. [1:28:24] >> Yeah, go on, [1:28:24] >> please. [1:28:29] » Thank you. Can you hear me? Okay. [1:28:32] >> Yes. [1:28:33] >> My name is Joan Maine and I live at [1:28:36] Seven Still Creek. [1:28:38] We are not here tonight, nor is anyone [1:28:41] here with a yellow hat on or not, to ask [1:28:44] you to deny housing or deny ADUs or even [1:28:48] for the right to Kristen and David to [1:28:51] build on their on their property. We [1:28:54] know that is the case and we support [1:28:56] that. Here's what we are asking. There [1:28:59] are more than 60 individuals in this [1:29:03] neighborhood now who are concerned about [1:29:05] the same things we'll present tonight. [1:29:08] We ask that you in fact ask the [1:29:12] applicants to follow the same codes we [1:29:15] all are not only asked to follow but [1:29:18] embrace as residents of Woodside. We are [1:29:22] here because we love Woodside. It's a [1:29:24] special and unique place. So is Still [1:29:27] Creek. Still Creek is a very special [1:29:30] place. [1:29:32] Now, why are we here? Over five years of [1:29:36] review, the ASRB found the applicants [1:29:40] did not adequately address their [1:29:43] recommendations. [1:29:45] The planning commission agreed. [1:29:49] I supported this at the ASRB in 2020 or [1:29:54] 2021 [1:29:56] before all the differences were made to [1:29:58] the project and the exceptions were [1:30:01] required. [1:30:03] So each failed finding is important. [1:30:07] Even one is a requirement for denial. [1:30:10] Tonight, an experienced forensic [1:30:13] architect and a wildland urban interface [1:30:17] fire expert will present their [1:30:20] independent conclusions and a Stanford [1:30:23] geoysicist's findings will be shared. [1:30:27] Point one, there are feasible conforming [1:30:31] options. [1:30:33] Perhaps they'd have to make something a [1:30:36] little smaller. [1:30:38] That's an option. That's not what [1:30:40] architect French will present because we [1:30:43] didn't ask that he redesign their [1:30:46] project. We asked the simple question, [1:30:50] can this be made to conform with the [1:30:52] 50-foot setbacks and the town's code? [1:30:56] Point two, these same code and policies [1:31:00] that were asked to follow ask all of us [1:31:04] to subordinate our projects to our land. [1:31:07] The land in question is fragile. [1:31:11] Point three, the site sits on [1:31:14] geologically unstable land and we will [1:31:17] share the fire experts findings of the [1:31:21] implications of the setback. Point four, [1:31:26] we believe the law allows you to do this [1:31:29] because of public danger. I'm running [1:31:31] out of time, so let me finish and say [1:31:34] thank you very much for your time. We do [1:31:37] not ask you to deni deny housing. We do [1:31:41] not ask you to deny ADUs. We ask you to [1:31:45] support the decisions of the planning [1:31:47] commission. [1:31:48] >> Okay. Thank you. [1:31:49] >> Sorry to go over. [1:31:50] >> That's okay. Thank you. Well, [1:31:52] >> really you're trying hard. [1:31:54] >> I appreciate it. Yeah. [1:32:01] No. [1:32:02] >> And also just a just a minor point, but [1:32:05] just if the comments can be directed to [1:32:07] council and not to anyone else in the [1:32:09] room, that would be appreciated. [1:32:15] » Good evening, Mayor Donowski and council [1:32:17] members. My name is Hance Mine and I [1:32:19] live at Seven Still Creek Road. I'd like [1:32:22] to introduce Adam French, an experienced [1:32:24] local architect with over 30 years of [1:32:26] experience. He's a member of the [1:32:28] American Institute of Architects and [1:32:30] holds certification from the National [1:32:32] Council of Architectural Registration [1:32:34] Boards. His practice includes [1:32:36] conception, detailing, coordination, and [1:32:40] construction of structures as well as [1:32:42] forensic architecture and ex expert [1:32:44] witness testimony. He has been retained [1:32:47] to investigate construction defects, [1:32:49] premises liability incidents, property [1:32:51] damage, and code compliance issues. He [1:32:54] will address one of the key elements [1:32:55] related to the propo proposed plans at [1:32:57] Ten Still Creek, the feasible that [1:33:00] feasible conforming alternatives exist. [1:33:03] Thank you. [1:33:05] >> Thank you, Adam. [1:33:06] >> So, you're seating your time to Adam. 2 [1:33:08] minutes 18 seconds. [1:33:19] » Welcome. Good evening, Mayor Dumbowski [1:33:21] and council members. My name is Adam [1:33:23] French. I'm an architect AIA and ENARB [1:33:25] certified and I prepared uh what is [1:33:27] referred to as attachment A. That would [1:33:29] be my report. Conforming alternatives [1:33:32] exist for this site and I'm here to tell [1:33:34] you tonight about that. I developed [1:33:36] alternatives using the applicant's [1:33:38] drawings. I did not need to invent [1:33:40] anything new. Based on the applicant's [1:33:43] drawings, I identified feasible options [1:33:45] that comply with Woodside's 50-foot [1:33:47] setback requirements. [1:33:50] The applicant's central claim is that [1:33:51] the site's topography necessitates [1:33:53] encroachments into the setback. It does [1:33:56] not. The proposed encroachments are not [1:33:59] unavoidable site constraints. They are [1:34:01] design choices. When a preferred design [1:34:04] fits only by violating the setback [1:34:05] rules, the design must yield to the [1:34:07] code. The code does not have to yield to [1:34:10] the design. The applicant has not [1:34:13] justified the requested exception. The [1:34:15] record contains no comparative analysis [1:34:18] study, no infeasibility analysis, no [1:34:20] cost documentation. [1:34:22] You cannot claim compliance is [1:34:23] impossible without showing the numbers. [1:34:26] Assertion is not evidence. My report [1:34:29] also raises a material question [1:34:31] regarding the floor area calculations [1:34:32] for the lower level of ADU number two, [1:34:35] which must be resolved before any [1:34:37] maximum resident size exception can be [1:34:39] granted. I'm not here to say the [1:34:41] applicant can't build. The applicant can [1:34:44] build. I'm here to show you that the [1:34:46] applicant can build within the required [1:34:49] setbacks using the feasible options I've [1:34:52] developed in my report. The required [1:34:54] findings cannot be made because feasible [1:34:56] options do exist. The site has limited [1:34:59] capacity. The proposed design exceeds [1:35:02] it. Applicants have not shown and cannot [1:35:04] show that compliance is infeasible. And [1:35:06] for those reasons, I respectfully [1:35:08] recommend the council deny the appeal [1:35:10] and require a conforming design. Now, [1:35:12] there's been a few things that have [1:35:13] happened since this morning or the big [1:35:15] binder that we all got. We're not I'm [1:35:18] not here saying you can't build [1:35:20] anything. What I'm here saying is that [1:35:22] after following the planning director's [1:35:25] recommendations for years that the [1:35:27] findings can't be made, that all of a [1:35:28] sudden the applicant shows up and pushes [1:35:30] an example into a grove of redwoods. And [1:35:34] that's not the case. I didn't come here [1:35:35] to draw all five findings mysteriously [1:35:39] unable to be proven all in one go. So I [1:35:42] request that you take a look at my [1:35:43] report the way that I've drawn the [1:35:45] buildings redesign move back into the [1:35:47] setback and I believe that you'll find [1:35:49] that they do comply with the existing [1:35:51] rules without the need for any [1:35:53] exceptions or special pleading or moving [1:35:55] the goalposts. [1:35:58] >> Thank you. Okay. Thank you. [1:36:05] Hi. Uh, good evening, Mayor Dumbowski. [1:36:10] Uh, [1:36:11] >> we can just go with mayor the rest of [1:36:12] the night. Don't worry about it. Mayor's [1:36:15] and the rest of the council members. My [1:36:16] name is Terry Bronstein. Terry [1:36:18] Bronstein. And I've lived at 150 Sunrise [1:36:22] Drive adjacent uh to this area for 47 [1:36:26] years. For most of those years, I have [1:36:28] regularly walked Still Creek Road. It's [1:36:32] the road to the redwoods. In fact, [1:36:34] that's where the redwoods start. Um, [1:36:38] what I see as I walk down that road [1:36:40] today is a mass of yellowtory poles. How [1:36:45] many of you have actually seen the site, [1:36:49] gone to the physical site? [1:36:52] You've all gone. Okay. then you know [1:36:55] that what we have shown uh as as [1:36:58] drawings just a few minutes ago of the [1:37:00] site don't resemble the actual site [1:37:04] among other things the site is the the [1:37:07] drawings are obscured by heavy shade [1:37:10] there is no shade the trees are gone [1:37:14] you've just heard architect French's ex [1:37:17] expert testimony that conform conforming [1:37:20] alternatives exist the al the applicants [1:37:23] have had 5 years to pursue them. They [1:37:26] have said no. Their design is a personal [1:37:28] preference to to actually to imitate the [1:37:32] architecture of 95 Skywood. Uh not the [1:37:35] only option the site allows. The their [1:37:39] latest um rationale [1:37:42] um for refusing to comply is they cannot [1:37:45] move the attached ADU without removing a [1:37:47] protected redwood tree. That statement [1:37:50] is extremely disingenuous. Why? Because [1:37:54] in August 2024, the applicants received [1:37:57] a permit to remove some dead and dying [1:37:59] trees uh on the site. They also [1:38:03] requested approval for 26 additional [1:38:06] trees to be removed and I'm quoting [1:38:08] directly from their application [1:38:10] facilitate the site's future [1:38:12] development. that tree removal permit [1:38:15] conditioned no development related trees [1:38:19] shall be removed without an issued [1:38:21] building permit. [1:38:24] Okay. They weren't allowed to cut down [1:38:26] any more trees. However, 3 months later [1:38:30] in November 2024, [1:38:32] a logging crew removed more than 40 [1:38:35] trees, including numerous large, healthy [1:38:39] redwood trees. That's why there's no [1:38:41] shade. [1:38:43] exactly where the applicants plan to [1:38:45] build the main residence and the garage [1:38:47] and tower and the JADU and the elevated [1:38:49] bridge and all the rest. That permit [1:38:52] condition has not been met. That was [1:38:55] actually an act of disrespect [1:38:58] intentional. [1:38:59] When asked, the applicants told the ASRB [1:39:03] it was a spontaneous neighborly gesture [1:39:05] to remove fire risk for the neighbors, [1:39:08] but no neighbors home is anywhere near [1:39:11] this. [1:39:12] The properties are large. They're [1:39:14] measured in acres, not feet. They all [1:39:17] have dense redwood forests on their own [1:39:19] land, thousands of trees. Um, the [1:39:23] applicants themselves have most of the [1:39:26] Anyway, [1:39:27] >> yes. [1:39:27] >> Um, that's just not credible. 10 months [1:39:30] later at the November 25, [1:39:33] >> we got we got we got to hold you to the [1:39:36] unfortunately. I'm sorry. [1:39:38] >> It's the laws, but I I appreciate it. We [1:39:40] know where you're going. My name is AJ [1:39:42] Cost. I live at 130 Sunrise Drive. [1:39:44] >> Yes. [1:39:45] >> And I'd like to relinquish my time to [1:39:46] Terry said. [1:39:47] >> There you go. [1:39:48] >> Thank you. [1:39:50] >> So articulate. [1:39:51] >> Okay. [1:39:51] >> Thank you. [1:39:53] >> Hard. [1:39:54] >> Yep. [1:39:55] So, uh, 10 months later at the November [1:39:58] 25 ASRB meeting, applicant submission [1:40:01] stated the project would preserve all [1:40:04] existing trees on the site after the [1:40:07] unauthorized removal had already taken [1:40:09] place. It's actually disrespect. [1:40:12] This afternoon, hours before the [1:40:14] hearing, too little time to even begin [1:40:17] to read the 342 pages, the applicants [1:40:20] offered a third justification for the [1:40:22] same tree removal, coordination with the [1:40:25] Woodside Fire Protection District. In [1:40:28] 2024, their permit application cited [1:40:30] future development. At the ASRB, they [1:40:33] cited neighborly concern for fire risk. [1:40:35] This afternoon, it's the fire district [1:40:38] coordination. There are three different [1:40:40] justifications, [1:40:42] three occasions, each one different from [1:40:44] the last. Which one's true? [1:40:48] The required findings cannot be made on [1:40:50] a record built of misrepresentation. [1:40:53] I ask the council to deny the setback [1:40:56] exception, deny the maximum resident [1:40:58] size exception, and hold the planning [1:41:01] commission's decision and uphold the [1:41:04] rest of this this Woodside government [1:41:06] that supports you. [1:41:09] Thank you. [1:41:12] Anyone else in Independence Hall? All [1:41:14] right. [1:41:18] » Good evening, Mayor and Council members. [1:41:21] Um, I'm Art Mirror. I live at 70 Skywood [1:41:24] Way and I'm the team Firewise team lead [1:41:26] for Skywood Acres. And tonight, I'd like [1:41:28] to introduce Mr. Keith Parker. He's a [1:41:31] forensic fire expert, a wildland uh [1:41:35] urban interface fire expert, and he's [1:41:37] the founder of Parker Fire Services [1:41:39] Consulting. He's a uh retired fire [1:41:43] marshall from Marin County uh with 33 [1:41:47] years of service and his firm has [1:41:48] investigated over 300 fires including [1:41:51] the campfire and the Maui wildfires. He [1:41:54] was retained by the Still Creek Road [1:41:56] residents uh to assess the project's [1:41:58] fire and safety uh implications. And [1:42:01] having read his report, I share his [1:42:03] concerns about the fire danger that this [1:42:05] project poses to our broader community. [1:42:07] For those of you who want to know where [1:42:08] his report is, it's it's attachment B in [1:42:11] your your desk packet. And uh I would [1:42:13] like to turn the rest of my balance of [1:42:15] time over to Mr. Parker. [1:42:22] Good evening, mayor and and council [1:42:24] members. Um, my name is Keith Parker. I [1:42:28] founded Parker Fire Services Consulting [1:42:30] and I primarily do forensic fire [1:42:32] investigations and I'm also a forensic [1:42:36] researcher in the wildland uh fires and [1:42:40] investigations. [1:42:41] As mentioned, I uh my 33y year career, I [1:42:44] spent five years as a county fire [1:42:46] marshal. I'm familiar with all the [1:42:48] issues that are being raised here and I [1:42:51] understand this is a very emotional [1:42:53] issue for all the parties involved and [1:42:55] what I hope to bring is some independent [1:42:58] um observations and thoughts that my [1:43:00] training and education and experiences [1:43:04] uh have allowed me to analyze in this in [1:43:08] this situation and I understand that the [1:43:10] council is getting a lot of advice on [1:43:12] what they must do. I'm not going to do [1:43:13] that. I understand that you're trying to [1:43:16] reach a balance here and it's very [1:43:18] difficult uh in a situation like this. [1:43:22] So when I look at projects like this, [1:43:25] when I start evaluating them, I often [1:43:28] look at it from the point of view I'm on [1:43:30] my fire engine responding to emergency [1:43:32] and I'm getting off the fire engine. [1:43:34] What is being presented to me from this [1:43:38] project? What does this add to the [1:43:40] complexities of a incident? [1:43:44] My report is probably a little overly [1:43:47] detailed. It's fairly lengthy and I went [1:43:49] into all these issues in depth. So, just [1:43:51] to summarize, there's really three key [1:43:53] areas of concern here. One is is that [1:43:56] there's four independent parking spaces. [1:43:58] And by that, I mean, if you look at the [1:43:59] plans, there's only four spaces that you [1:44:02] can park off the road that are [1:44:04] guaranteed you can get your car and [1:44:05] leave. All the rest are dependent upon [1:44:08] those four spaces being um vacated to be [1:44:11] able to egress. My experience is is that [1:44:14] things such as parties, whether it's a [1:44:16] summer party, holiday party, you're [1:44:18] going to end up with people parking on [1:44:19] the street. And I don't think anybody [1:44:21] doubts the fact that that street cannot [1:44:23] support uh vehicles parked along the [1:44:26] sides of the road and still provide for [1:44:28] emergency access. This is not just a [1:44:31] fire issue. This is an issue that arises [1:44:33] all the time in these types of areas. [1:44:35] for a simple emergency medical aid where [1:44:37] you can't get through, you have to get [1:44:39] out and walk to the houses past and then [1:44:41] it also forces you to back to a point to [1:44:44] turn around. [1:44:46] Um such a large project will also [1:44:49] increase the complexities of uh fire [1:44:52] attack both initial structure and [1:44:54] wildland fire attack and it will also um [1:44:58] impact the ability to evacuate people [1:45:00] and get emergency [1:45:02] uh response into an area should a [1:45:05] wildfire a significant wildfire move [1:45:06] through the area. [1:45:10] um the changes that result from this [1:45:14] essentially large uh development on a [1:45:17] very small 4500 to 7200 square foot um [1:45:23] project. I'm sorry. Is that [1:45:25] >> No, you still have two minutes. Keep [1:45:26] going. [1:45:27] >> Okay. Thank you. Okay. [1:45:29] Um [1:45:32] so below the below grade structure also [1:45:36] is close enough to the road that if it's [1:45:37] involved in fire is likely going to [1:45:39] block the road from the thermal effects [1:45:42] of the fire. [1:45:44] So we and the fire service had known [1:45:45] since the 1980s we started talking about [1:45:47] what we call the expansion into the [1:45:50] urban wildland and we knew these [1:45:51] problems were coming and we really saw [1:45:54] it come to fruition in 1991 in the [1:45:56] Oakland Hills and in the decades since [1:45:59] then we've seen the problem explode to [1:46:01] where we're at today. [1:46:05] The in this particular area we're [1:46:07] looking at some really severe [1:46:09] circumstances. We've already talked [1:46:11] about how steep the terrain is. There's [1:46:14] a major drainage that runs up to the [1:46:17] street and then as it moves forward it [1:46:19] splits into three drainages going up to [1:46:21] the communities above. We also have had [1:46:24] fire exclusion, no fire through the area [1:46:26] that and the logging and poor logging [1:46:29] practices that have allowed for a [1:46:32] massive accumulation of fire fuels. So [1:46:34] our redwood forest is very significantly [1:46:37] altered in the area. And then we have [1:46:39] climate pattern changes that are [1:46:41] providing for longer periods of hot dry [1:46:43] weather that are increasing our numbers [1:46:45] of days when we can have severe fire um [1:46:49] conditions. [1:46:53] So [1:46:57] there's there's really no reasonable [1:46:58] claim. This is not an extreme or very [1:47:01] high fire hazard area and this isn't the [1:47:03] average place that we need to look at [1:47:05] mitigating these fire threats. [1:47:08] um granting the setback exceptions are [1:47:11] definitely going to make any kind of [1:47:13] mitigations very difficult if not [1:47:15] impossible for um many of the reasons [1:47:18] I've been talking about. But one of the [1:47:20] most significant ones is the parking, [1:47:22] the closeness of a burning structure to [1:47:24] the road. And the third would be the [1:47:26] inability to have enough room to create [1:47:29] adequate defensible space to both [1:47:31] prevent transition of a fire from the [1:47:34] structure into the wildland and also [1:47:36] support [1:47:37] >> uh [1:47:37] >> like that's it. [1:47:39] >> Fire protection. [1:47:41] >> I lost my Is that it? [1:47:42] >> That's it. Unless unless we have a [1:47:44] parliamentary [1:47:47] >> folks. Good evening. I'm Vivian Sham at [1:47:49] 90 Stylers Way on many for much [1:47:51] appreciation for everyone being here [1:47:53] tonight. I seed my time to Mr. Keith [1:47:55] Barber. [1:47:56] >> Okay. [1:47:58] Thank you very much. I'm not going to [1:47:59] need much. I'm sorry. I lost the the [1:48:01] clock dropped up there, so I I lost [1:48:03] that. Um, just listening to some of the [1:48:06] other comments I think is really [1:48:07] important here is we're talking about [1:48:08] the only alternative is to grant these [1:48:11] uh exceptions to setback rules, but the [1:48:15] other possibility is downsizing the [1:48:18] totality of the project to work into it. [1:48:21] At the end of the day, what we're [1:48:23] really talking about here is we're [1:48:24] trying to squeeze a seven pound loaf [1:48:25] into a 5B bread box. And that causes a [1:48:29] lot of challenges that, as I've talked [1:48:31] about and are detailed in the report [1:48:33] regarding the the specific fire, life [1:48:36] safety hazards that a project that's [1:48:39] really oversized for the footprint [1:48:40] available to build on this property. And [1:48:43] I'll be staying I'll be here through the [1:48:45] meeting. If you have if anybody has any [1:48:47] questions, I'd obviously be happy to [1:48:48] answer them for you. [1:48:50] >> Okay. Thank you, Mr. Burgerer. [1:49:06] » Good evening, mayor and council members. [1:49:08] Uh, my name is Jendi Sue and I live at [1:49:11] 45 Sto Creek Road at the end of the [1:49:13] culde-sac. U, my husband, Aaron, and I [1:49:16] have one way out. To evacuate, we must [1:49:20] pass directly in front of 10 Steel Creek [1:49:22] Road and reach the Skywood Way, Sunrise [1:49:25] Drive, Still Creek Road intersection. [1:49:28] That is our only exit. It's everyone's [1:49:31] only exit who lives on that road. One of [1:49:34] the required funding findings before [1:49:36] this council is that the proposed [1:49:39] project will not create significant [1:49:41] public health and safety risks. That [1:49:44] finding cannot be made and we know this [1:49:47] in part because applicants themselves [1:49:49] have already admitted it. Applicants [1:49:51] have acknowledged in their own [1:49:53] submissions that this project would [1:49:55] create substantially increased traffic [1:49:58] affecting not just Skil not just Still [1:50:00] Creek Road but the surrounding Skywood [1:50:03] area. Those are their words, not ours. [1:50:08] Consider what that means. Still Creek [1:50:10] Road is a narrow private road 18 feet or [1:50:14] less in many locations. It is the sole [1:50:18] access point for the proposed [1:50:20] development. [1:50:22] It already fails three mandatory [1:50:24] statewide fire access standards, lane [1:50:28] width, loadbearing capacity, and [1:50:31] turnaround diameter. The town has [1:50:34] refused to accept it as a public road [1:50:37] for more than 50 years precisely because [1:50:40] of these constraints. [1:50:43] Now applicants propose to add four [1:50:46] structures and up to 20 parking spaces [1:50:49] where none currently exist. More [1:50:52] vehicles, more residents, more [1:50:55] evacuation demand on a road that already [1:50:58] cannot meet minimum safety standards. [1:51:02] Every additional vehicle from this [1:51:04] development is one more obstacle between [1:51:07] my family and every Skywood family and [1:51:10] safety. [1:51:12] Every additional second of delay matters [1:51:15] when fire moves upheld through chimney [1:51:17] terrain. [1:51:19] The road cannot be widened by a permit [1:51:22] condition. Its load rating cannot be [1:51:25] improved by a condition. A second access [1:51:29] point cannot be created by a condition. [1:51:33] The public safety finding cannot be [1:51:35] made. I ask the council to deny this [1:51:38] appeal. Thank you. [1:51:39] >> Thank you. [1:51:44] Well, nobody in the Zoom room with a [1:51:46] question. So, welcome, sir. [1:51:50] >> Uh, good evening, mayor and council [1:51:52] members. Uh, my name is Royal Copro and [1:51:54] I live at 35 Still Creek Road. Let me [1:51:57] bring the mic up for you just for the [1:51:58] people online. [1:51:59] >> How's that? [1:52:00] >> Perfect. [1:52:00] >> I live at 35 Still Creek Road. Um I'm [1:52:03] presenting on behalf of Simon Cleer [1:52:05] who's a professor of geoysics at [1:52:07] Stanford University. He apologizes that he cannot be here [1:52:11] tonight. He has a prior commitment for a [1:52:13] lecture at Cambridge. Uh Professor Cler [1:52:16] has lived at three Still Creek Road [1:52:18] across from this site for 25 years. His [1:52:20] analysis is documented in attachment C [1:52:23] and it identifies three overlapping [1:52:25] geological hazards. First, the proposing [1:52:28] the proposed building footprint sits [1:52:30] directly on active and dormant landslide [1:52:32] deposits. The town's own general plan [1:52:34] acknowledges that these deposits can be [1:52:36] reactivated under present conditions. [1:52:39] Second, the United States Geological [1:52:41] Survey maps the Pillar's fault running [1:52:43] directly through the project site. Dr. [1:52:45] Clamper has personally observed repeated [1:52:47] ruptures of buried water pipes at the [1:52:49] fault crossing, indicators of ongoing [1:52:52] fault creek. The applicant proposes to [1:52:54] build on and across this fault. Third, [1:52:57] the site has limited carrying capacity. [1:52:59] The proposed 4-unit compound exceeds it. [1:53:02] Findings four and five cannot be made [1:53:04] for these reasons. Still Creek Road is a [1:53:06] private road. The town is repeated, as [1:53:08] we've heard, the town has repeatedly [1:53:09] declined to accept it as public. The co [1:53:12] the town's own subdivision code WMC [1:53:15] 152.005 [1:53:17] and following requires that roads um [1:53:20] serving developments be physically [1:53:21] suitable, protect against geological [1:53:24] hazards and support fire protection and [1:53:26] safety equipment access and the roads [1:53:28] capacity is limited in those respects. [1:53:30] The town's refusal reflects both those [1:53:32] fa physical and safety standards, not [1:53:35] just a fiscal preference alone. A road [1:53:37] failure on this stretch cost hundreds of [1:53:39] thousands of dollars to repair just over [1:53:41] seven years ago. And yet the same steep [1:53:43] channels continue to carry water and [1:53:45] debris across and down this hillside [1:53:47] feeding under the road through drainage [1:53:49] culverts and into Alen Beak Creek. In [1:53:51] the last seven years, there have been [1:53:52] repeated debris flows um from the [1:53:54] hillside which have blocked culverts and [1:53:56] threatened the road stability. This [1:53:58] demonstrates the land's carrying [1:54:00] capacity and it's the same land where [1:54:02] the applicant proposes to build a 4-unit [1:54:04] compound. I respect I respectfully ask [1:54:07] that you deny this proposal. Thank you. [1:54:10] >> Thank you. [1:54:15] Yes, sir. [1:54:22] Good evening. Uh my name is Aaron Amy. [1:54:24] Uh I live with my wife Ji Sue at 45 Soul [1:54:28] Creek Road. You've now heard from [1:54:30] architects, fire investigators, [1:54:32] geoysicists, and neighbors. Uh the [1:54:34] record before you is clear. I just want [1:54:37] to address two more topics uh for your [1:54:39] consideration. Um the staff uh issued [1:54:43] recommendations on the eve of this uh of [1:54:45] this hearing uh approximately 6 months [1:54:47] after the planning commission's uh [1:54:48] denial. Um those recommendations deserve [1:54:51] some mention and some scrutiny. Um when [1:54:54] staff prepared their report, they did [1:54:56] not have the expert findings uh that are [1:54:58] now before this council. They didn't [1:54:59] have architect French's demonstration [1:55:01] that conforming alternatives exist. They [1:55:02] were unaware of the fire safety hazards [1:55:04] identified by fire fire marshal Parker. [1:55:07] Uh and they did not have Professor [1:55:08] Clumper's uh geological hazard [1:55:10] testimony. Uh the expert record now [1:55:13] before you directly repeatedly and [1:55:15] authoritatively contradicts uh the [1:55:17] staff's conclusion. Uh as you know uh [1:55:19] staff's recommendations are advisory. [1:55:21] The ASRB and the planning commission are [1:55:24] the townmandated citizen bodies [1:55:26] specifically charged with this review. [1:55:28] Both uh including the one that Mr. [1:55:30] middleman serves on uh conducted [1:55:33] thorough independent reviews and both [1:55:35] reached the same conclusion uh that the [1:55:38] application should be denied. Uh their [1:55:40] work deserves greater weight than a [1:55:42] staff report based on incomplete [1:55:43] information uh as do the expert analyses [1:55:46] uh that staff uh did not consider uh [1:55:49] because they didn't have them. Second, [1:55:51] the state law. Uh applicants have cited [1:55:54] multiple state housing statutes as if [1:55:56] they compel approval and even [1:55:59] helicoptered in a couple of lawyers to [1:56:00] issue threats and and uh try to bully uh [1:56:03] to you. I trust that you're not swayed [1:56:06] by that kind of behavior. Um [1:56:09] and and also that you would consider the [1:56:11] liability that would be created um by [1:56:14] increasing uh the development on Silk [1:56:16] Creek Road beyond its its carry-in [1:56:18] capacity. Um, [1:56:20] you heard from the the the town attorney [1:56:23] uh that this is not uh falling under [1:56:25] HAA. Uh, but even if it was, uh, [1:56:28] California's HAA allows denial where [1:56:30] expert evidence documents specific [1:56:33] public health and safety impacts based [1:56:35] on objective written standards. Fire [1:56:37] Marshall Parker's expert report does [1:56:39] exactly that, documenting three specific [1:56:42] fire access failures against three [1:56:44] objective mandatory written standards. I [1:56:47] agree with staff's assessment that [1:56:48] applicants arguments uh on this subject [1:56:50] have no merit. Um they're requesting [1:56:54] discretionary exceptions to approve [1:56:56] their non-compliant design choices [1:56:58] despite the existence of compliant [1:56:59] alternatives. Um the law gives the [1:57:02] authority to say no and the record gives [1:57:03] you ample reason to. Uh denying this [1:57:05] appeal does not prevent applicants from [1:57:07] building. They can still build a home [1:57:08] with ADUs at 10 Still Creek Road within [1:57:10] the required setbacks within the code [1:57:12] consistent with ASRB guidelines and [1:57:14] without special treatment like every [1:57:15] other Woodside resident. 5 years of ASRB [1:57:18] review, a recommendation to deny, [1:57:20] planning commission denial, three [1:57:21] independent expert reports, serious [1:57:23] safety concerns, a community unified in [1:57:25] opposition, state law that preserves [1:57:27] this council's authority, the record [1:57:29] supports denial, the law supports [1:57:30] denial, and we respectfully ask you to [1:57:32] deny this appeal. Thank you. [1:57:34] >> Thank you. [1:57:37] Lifeline not needed. [1:57:41] >> Um, other comments. [1:57:45] Yes, sir. [1:57:55] » Hi. [1:57:57] >> How's this? [1:57:59] It's great. Does that work? [1:58:01] >> Big rocks and little rocks. Perfect. [1:58:03] Three points today. First, Woodside was [1:58:07] incorporated in 1956 for one reason, to [1:58:10] preserve our character. Central to that [1:58:13] character is a culture of volunteerism, [1:58:16] citizen- le government, and a basic code [1:58:18] of trust, even when we disagree. [1:58:22] Three of you, three of you have had your [1:58:24] personal and professional lives appended [1:58:26] this year. In Teddy Roosevelt's words, [1:58:29] the credit belongs to the man or the [1:58:31] woman who is actually in the arena. [1:58:35] whose face is marred by dust and sweat [1:58:38] and blood. Who at the worst if he or she [1:58:41] fails at least fails while daring while [1:58:43] daring greatly so that his or her place [1:58:47] shall never be with those cold and timid [1:58:49] souls who neither know victory nor [1:58:50] defeat. What happened to you is an [1:58:53] aberration of our culture. [1:58:56] I'm sorry for the sleepless nights and [1:58:58] the personal and professional anguish [1:58:59] you have endured. That is the burden of [1:59:02] volunteerism and leadership. [1:59:04] Thank you for your service and please [1:59:06] don't be deterred by the arrows from the [1:59:08] folks in the seats. This case Ten Still [1:59:12] Creek [1:59:13] has also been inconsistent with our [1:59:15] culture. In 2023, I was asked by Mr. [1:59:19] Middleman to secure In 2023, I was asked [1:59:22] by Mr. Middleman to secure planning [1:59:24] commission votes in the applicant's [1:59:25] favor. [1:59:27] When that failed after the planning [1:59:29] commission vote, I w a ethics complaint [1:59:32] was filed publicly against me by the [1:59:35] middleman's. I suggest you read the [1:59:38] ethics complaint and its findings to get [1:59:40] an idea for the applicant's ethics. [1:59:44] And most recently, we were all served [1:59:46] with public records request, a clear [1:59:49] signal that honey wasn't working and [1:59:50] vinegar was coming from Costco. [1:59:54] And today you heard a litany of threats [1:59:56] that the town would be subjected against [1:59:58] by their attorney who has litigated the [2:00:00] most cases ever in the state of [2:00:02] California. [2:00:04] This comes down to one thing, character. [2:00:07] Cave in bullying becomes an acceptable [2:00:09] way to do business in this town. Today [2:00:12] the applicant's making a bet and the bet [2:00:15] is that with everything the town has [2:00:17] gone through this year, the town does [2:00:19] not want a lawsuit. [2:00:21] So their application will be granted. [2:00:24] My second point, the applicant has had [2:00:27] every advantage. [2:00:29] State density mandates, full planning [2:00:32] department support, unlimited [2:00:34] presentation time. You've witnessed it [2:00:36] today, [2:00:38] and the full win behind their backs at [2:00:40] every point. Yet they cannot get a [2:00:43] favorable vote. Why? [2:00:48] because demanding a variance while [2:00:49] making zero effort [2:00:53] to work with the affected neighbors [2:00:57] and and the more time goes by doubling [2:01:00] down on threats at every turn. [2:01:04] Let me repeat that. [2:01:06] >> We got just do the parliamentary thing [2:01:07] here for a second, Alex. [2:01:10] >> Please. Thank you. [2:01:11] >> Um good evening. My name is Barbara [2:01:14] Costa and I would like I live at um 130 [2:01:16] Sunrise Drive and I would like to donate [2:01:18] my time. Thank you. [2:01:21] >> Thank you. [2:01:24] >> I'm going to repeat this again. The [2:01:25] applicant has had every advantage, state [2:01:28] density mandates, full planning [2:01:30] department support, unlimited [2:01:32] presentation time every time, and full [2:01:35] win behind their backs at every point. [2:01:36] Yet, they cannot get a favorable vote. [2:01:40] Why? Look at the yellow caps here. Zero [2:01:44] input into this project and at every [2:01:47] turn doubling down on threats. [2:01:50] Exhibit A myself. [2:01:53] Third, let's be clear about one thing. [2:01:56] No one is denying their right to build. [2:02:00] No one is suppressing housing units. [2:02:03] We are denying a variance request. [2:02:07] They can revise their plans. They can [2:02:10] stay within their building envelope [2:02:12] and still get everything they need. [2:02:15] The message in this room is [2:02:17] unmistakable. [2:02:19] Vote our way and we'll vote our way or [2:02:22] we'll sue. [2:02:24] You've heard the many disguised threats [2:02:26] tonight [2:02:28] and you've been subjected to these [2:02:29] disguised threats earlier this year. [2:02:32] Vote our way or we'll sue. [2:02:37] That's who we are. No, [2:02:42] I did not serve in the armed forces. I [2:02:45] became a US citizen. [2:02:47] And for everybody that knows me, I am a [2:02:50] representation of what America is. [2:02:53] We deserve better. [2:02:56] Thank you. [2:02:58] Alex. [2:03:04] No need for Yes, sir. Welcome. [2:03:09] Where's the [2:03:13] » My name is Jeffrey Pel. I grew up here [2:03:16] and have lived just up the street on [2:03:18] Miramontes Road for over 20 years, [2:03:21] almost my whole life. [2:03:23] But it's like this that makes me [2:03:26] embarrassed to say that I'm from [2:03:28] Woodside because we have shown ourselves [2:03:31] to consistently be part of the problem, [2:03:34] not the solution. We are the town that [2:03:36] tried to declare itself a mountain lion [2:03:38] sanctuary to get out of building housing [2:03:40] in a housing crisis. That is who we are [2:03:42] to the rest of California. [2:03:44] This project is the top pipeline project [2:03:46] in our housing element. And a no vote [2:03:48] here is the sort of thing that gets [2:03:49] elements descertified and cities [2:03:51] subjected to builder's remedy. But more [2:03:54] importantly, to deny this project is to [2:03:56] harm someone for the benefit of almost [2:03:58] no one. I've never needed to drive down [2:04:01] Still Creek Road. And the same is [2:04:02] probably true for the vast majority of [2:04:04] other residents in town. You've heard [2:04:07] from a lot of people who claim that the [2:04:09] project would be unsafe, impinge on [2:04:11] their privacy, and so on and so forth. [2:04:14] Some of the arguments given tonight [2:04:15] would apply equally well to any house [2:04:18] anywhere. In reality, the cost we're [2:04:21] struggling with is that a small handful [2:04:23] of neighbors would be subjected to the [2:04:25] occasional and brief view while driving [2:04:27] of a house. If they wanted that land to [2:04:30] stay empty, any of them could have made [2:04:32] an offer. As far as I'm aware, they [2:04:34] didn't. Instead, they're trying to abuse [2:04:36] the machinery of government to assert a [2:04:38] property right over land that isn't [2:04:40] theirs. That is not what the planning [2:04:42] process is for. That's not what [2:04:43] government is for. And I don't believe [2:04:45] this council should reward it. Time is [2:04:47] money for the applicants as well as for [2:04:49] the Peninsula Housing Market as a whole. [2:04:51] To vote no tonight would be to continue [2:04:53] to impose an unjust loss on a family [2:04:56] with their roots here, like myself, like [2:04:58] many others here, who wants to raise [2:05:00] their kids here, like many others in [2:05:01] this room, who've been dragged through a [2:05:03] Kafka-esque nightmare of our own [2:05:05] creation for years for trying. Building [2:05:08] houses is not contrary to the character [2:05:10] of the town. Those who do vote no should [2:05:12] be ashamed. This is not a difficult [2:05:14] decision. I ask the council to do the [2:05:16] right thing, accept staff's [2:05:18] recommendation, and approve the project. [2:05:20] Thank you. [2:05:21] Jeffrey. [2:05:27] Others. [2:05:33] Okay. Well, nobody has got there. [2:05:36] Anybody on? There we go. Uh, [2:05:39] wonderful suggestion. Thank you. Uh, [2:05:42] Caroline Caroline, welcome. [2:05:44] >> Hi. Yes. Thank you. I'm here to speak in [2:05:48] support of the applicant and the [2:05:50] proposed project at 10 Still Creek. My [2:05:52] name is Caroline New. I'm Kristen's [2:05:54] sister. I'm also a resident of Woodside. [2:05:57] As you've heard, Kristen and David, my [2:05:59] brother-in-law, have been pursuing this [2:06:01] project for 5 and a half years on land [2:06:03] that our dad purchased in the 70s. [2:06:06] And they intend to build this [2:06:08] multi-generational residence and provide [2:06:10] affordable housing to help satisfy [2:06:12] Woodside's housing element. As was just [2:06:15] mentioned in the town's certified [2:06:17] housing element plan for 2023 to 2031, [2:06:22] this property 10 Still Creek is listed [2:06:24] as the first pipeline project on that [2:06:26] chart. The proposed building site lies [2:06:30] on 2/10 of an acre of the 9.6 acre [2:06:35] property located among hundreds of [2:06:38] redwood trees with no neighbors in [2:06:40] sight. Our neighbors have expressed [2:06:44] concerns in the past that have not been [2:06:46] said out loud tonight. During previous [2:06:49] town meetings, neighbors voiced their [2:06:52] concerns about who would be living in [2:06:54] the affordable housing units, saying the [2:06:56] project doesn't belong in, is not [2:06:59] appropriate for Woodside, and describing [2:07:02] it as an apartment complex. [2:07:04] This is elitism and classism at best, [2:07:07] discrimination at worst. [2:07:11] As a reminder, in 2021, the ASRB [2:07:15] approved the application to proceed to [2:07:17] formal design review, but when Kristen [2:07:20] and David decided to add a third ADU to [2:07:22] house an additional community member, it [2:07:25] had to go back to square one. [2:07:28] We've seen that many neighboring [2:07:30] properties in Skywood Acres have at [2:07:32] least one setback that does not match [2:07:35] the town of Woodid's current zoning [2:07:38] because the neighborhood was annexed [2:07:40] into Woodside [2:07:42] um decades ago and until that point [2:07:45] setbacks were under the purview of the [2:07:48] county which did allow for setbacks of [2:07:52] 25 ft in the front. So increasing the [2:07:56] setback, not granting this exception [2:07:59] that they've requested. [2:08:02] If they were to go back to the drawing [2:08:03] board and redesign has been suggested, [2:08:06] increasing that setback would require [2:08:09] more excavation to level the hill, [2:08:12] increase the number of trees that need [2:08:14] to be removed. And Kristen and David, [2:08:17] but especially Kristen, has always [2:08:20] wanted to respect the woods, the natural [2:08:23] terrain, and disturb the land as little [2:08:26] as possible because she respects this [2:08:29] land more than anyone I know. Thank you. [2:08:35] >> Thank you, Caroline. [2:08:38] >> Yes. Welcome. [2:08:42] I'm also a Caroline, but mine is [2:08:45] Carolina Blake and I live at 60 Ranch [2:08:49] Road Skywood Acres and I was a firewise [2:08:54] leader for Skywood and Steel Creek for [2:08:56] the past five years. I just turned that [2:08:59] over to Art [2:09:02] um and he will continue with that. The [2:09:05] town of Woodside for the last 50 years [2:09:08] has refused to make Steel Creek into a [2:09:11] public road because the land does not [2:09:14] have the capacity to support such a [2:09:16] development. [2:09:18] Therefore, the town now wants to approve [2:09:22] such a heavy development on the same [2:09:25] land by making an exception for the [2:09:28] benefit of only two people, one family [2:09:32] that increases the fire risk for the [2:09:35] entire community. The code must be [2:09:38] applied equally to everyone so we can [2:09:42] all be safe. [2:09:46] The appeal is asking that the town [2:09:48] treats these applicants differently by [2:09:51] granting an extension only for them. [2:09:54] You just have heard from Fire Marshall [2:09:56] Parker and a lot of other people that [2:09:59] extending the extension will endanger [2:10:03] not only the other residents in Still [2:10:05] Creek, but also our neighborhood, which [2:10:08] is adjacent Skyward Acres, adjacent with [2:10:13] 75 homes and approximately [2:10:17] 200 people. [2:10:20] If you grant this extension and place [2:10:22] our community at a great risk of losing [2:10:25] our homes or insuranceances, [2:10:27] is the town also going to consider today [2:10:30] to be accountable and put in place [2:10:33] measures that protect us? [2:10:38] Is the town going to set aside a fund to [2:10:40] help us rebuild our homes? Is the town [2:10:44] going to get us insurance where our [2:10:46] current insurance get cancelled? Is the [2:10:49] town going to pay for the difference for [2:10:52] a much more expensive insurance that we [2:10:54] will need to pay to secure our [2:10:56] community? If the answer to these [2:10:59] questions is no, the town must deny the [2:11:02] exception and must deny the appeal. [2:11:06] State housing law does not override [2:11:09] California's state fire safety code and [2:11:13] regulations in particular in the areas [2:11:16] of very high fire severity zones as [2:11:20] defined by the California government [2:11:22] code. Thank you. [2:11:25] >> Thank you. [2:11:30] Other comments? Anyone in the Zoom room? [2:11:34] Anyone [2:11:37] in independence hall? [2:11:40] Okay, then we will close uh well before [2:11:44] we close public comment. Are there any [2:11:46] questions of any of the public speakers [2:11:49] by any member of the council? [2:11:55] Just I have one uh I'm sorry. Let me um [2:11:59] I don't know who directed it at so maybe [2:12:00] I'll go to you Mr. Parker. Um [2:12:04] this is this [2:12:06] heard it repeatedly tonight, but it's [2:12:07] this issue of Oh, and hi Jen. We'll go [2:12:09] to Jen next. Um [2:12:11] the idea of a it's a tipping point [2:12:14] argument that of all the houses, this [2:12:16] next one is going to be the one that's [2:12:18] going to cause fire risk and safe public [2:12:21] safety risk. Why is this project versus [2:12:24] any other house in the neighborhood now [2:12:26] that why would we consider it the [2:12:28] tipping point project? I mean, this is a [2:12:30] case that's being made by by a lot of [2:12:33] people here tonight, [2:12:36] >> right? I I believe I understand the [2:12:38] question is we're talking about what [2:12:40] what's the the true increased level of [2:12:42] risk and in the report I I describe it [2:12:45] as uh we can't we need to do we do what [2:12:48] we can with existing homes and going and [2:12:50] make with the firewise programs and and [2:12:52] trying to deal with them. The key is [2:12:54] we've got to stop adding to the problem. [2:12:56] And I started in the 1980s trying to [2:12:59] convince uh many of us that we we've got [2:13:01] to stop adding to the problem [2:13:03] incrementally. So whether this is a a [2:13:05] catastrophic issue in a wildfire um is a small percentage, but it's adding [2:13:11] to the piece. It's very likely a piece. [2:13:13] it's going to cause blocked roads and uh [2:13:15] at times and that enters into the [2:13:19] overall fire life safety and there's [2:13:21] ways of it from what I see there's ways [2:13:24] of mitigating the increased risk to a [2:13:26] level to where it's close it's so [2:13:28] minuscule or so small it wouldn't um [2:13:32] really enter into this but as it's uh [2:13:35] exists right now a very large project [2:13:37] very small uh footprint to build on uh [2:13:41] close to the roads not allowing adequate [2:13:43] defensible space. Its own plan calls for [2:13:45] 100 ft. It can't reach that. So, it's [2:13:47] just it's again it's just too much in in [2:13:49] a small area and it can be mitigated uh [2:13:52] by downsizing and meeting existing [2:13:55] standards. [2:13:56] >> Okay. Thank you. Council member Wall [2:14:00] have a question. [2:14:01] >> Yeah. Um actually have a question for [2:14:03] staff. Um procedurally, is that okay if [2:14:06] I direct another question towards staff [2:14:08] based on what I just heard? [2:14:12] Yeah. [2:14:13] >> Okay. Um, so I heard at least two but [2:14:17] maybe more um folks comment on this [2:14:21] notion that the town has refused to turn [2:14:24] Still Silk Creek Road um or convert it [2:14:28] into a public road. I don't know if this [2:14:30] is a question for Sage or maybe Jean. [2:14:33] Could one of you just sort of give us [2:14:35] some additional context there? Has have [2:14:37] there been, you know, applications for [2:14:38] that? what is what what can you tell us [2:14:40] about that topic? [2:14:46] » So, there's an attachment in your um [2:14:48] staff packet which gives the history of [2:14:50] this, but um this was um required to be [2:14:53] a private road uh way back in the 70s [2:14:56] when the subdivision was approved. [2:14:58] There's a road maintenance agreement in [2:14:59] place. It's been in place since that [2:15:01] time which obligates the owners along [2:15:04] that road uh to maintain the road. um if [2:15:07] they do not, the town has options to um [2:15:11] encourage and or force that maintenance, [2:15:13] but it is a private road. Has always [2:15:15] been intended to be a private road based [2:15:17] on the original subdivision. [2:15:21] >> Thanks, Jean. Maybe just a quick [2:15:22] follow-up question. So, have has has [2:15:24] there been an effort on behalf of the [2:15:28] residents that are um a part of that [2:15:31] road maintenance agreement to convert [2:15:33] the road into a a a non-private road? [2:15:39] I think I recall um several occasions [2:15:41] where um um at least Mr. Middleman has asked that the town consider that. [2:15:48] If I'm incorrect, he can he can correct [2:15:51] me. Um, but I don't recall anyone else [2:15:53] uh coming before the council and making [2:15:55] that request, nor nor would staff um [2:15:57] recommend that. [2:16:01] » Um, I'd like to re uh recognize [2:16:04] Christine new to also speak on this [2:16:06] issue. [2:16:12] » Sorry, just to add two things. So, one [2:16:17] um my husband David Middleman brought [2:16:19] that proposal to the town actually with [2:16:22] support of neighbors at that time to [2:16:24] make the town public. Um part of that [2:16:28] was that one of the arguments was that [2:16:30] Sunrise Drive is a public road yet at [2:16:32] dead ends with no access to anything. [2:16:34] Whereas Still Creek Road is the only [2:16:36] access for example to Wonderlick Park [2:16:38] between the main entrance and skyline. [2:16:40] Um it also is the access point for the [2:16:43] slack lines which pose a fire hazard to [2:16:46] the area. Um and then the last thing you [2:16:49] had mentioned a road maintenance [2:16:50] agreement that was not a road [2:16:51] maintenance agreement. It was a covenant [2:16:53] that was made between the owners that [2:16:54] followed the owners not the properties [2:16:56] and it was um dissolved actually by the [2:17:00] residents of 45 Still Creek upon their [2:17:02] purchase of the property uh a number of [2:17:04] years ago. Um, and so that is no longer [2:17:07] there is no agreement, covenant, [2:17:09] whatever you want to call it. There is [2:17:10] nothing like that in existence for that [2:17:12] road. [2:17:13] >> Okay. [2:17:15] >> Yeah. [2:17:17] >> Thank you for correcting my my memory of [2:17:18] the the um request to to uh turn it into [2:17:21] a public. I would disagree with one [2:17:23] thing uh that Miss N just said. Uh there [2:17:26] were some CCNRs that were in place. [2:17:28] Those were rescended years ago, but [2:17:30] those specifically indicated that the [2:17:32] road maintenance agreement remained in [2:17:33] place and it did not um transform this [2:17:36] into a public street. It is a private [2:17:38] road. [2:17:38] >> Okay. We still have public comment open. [2:17:41] So, if you want to this is a second bite [2:17:43] of the apple, but [2:17:45] >> Miss New just mentioned the residents of [2:17:46] 45 Silk Creek Road as the the people in [2:17:49] question. Uh I I concur that that that [2:17:52] road maintenance agreement was not was [2:17:54] not dissolved uh as part of the the the [2:17:57] transaction there. It was rather um as [2:17:59] uh Miss Savvery or is it Savari Savory [2:18:04] has said that was the the CCNRS. Um but [2:18:07] I I would also just point out one of the [2:18:10] big concerns we have here uh is the [2:18:13] where that's going to happen on the [2:18:15] road. Um it's a safety issue as has [2:18:18] already been highlighted to you. It's [2:18:19] also a cost issue. We spent hundreds of [2:18:21] thousands of dollars just a few years [2:18:23] ago when the the road's not in good [2:18:25] condition. It was it was wiped out uh in [2:18:27] one small section. Um and the applicants [2:18:30] have refused to to uh accept a [2:18:32] responsibility for damage to the road [2:18:34] during construction. And you know, we [2:18:36] have a a lot of concerns around that for [2:18:37] that. So, if the town considers [2:18:40] approving something like this, I hope [2:18:42] you would also take responsibility for [2:18:43] the road because I think it's going to [2:18:45] create a lot of cost and liability for all of us who own the road. Thank [2:18:49] you. [2:18:50] >> Okay. [2:18:52] Um before we close the public [2:18:54] hearing, just want to make sure we have [2:18:56] all the comments uh particularly any [2:18:58] comments that were submitted today. Um [2:19:01] so, those are all in the record. [2:19:04] I'm going to give you a final statement [2:19:05] in a second. I'm going to allow [2:19:06] rebuttal. Same thing. [2:19:08] >> Yes, I am. [2:19:12] » Okay. Then we're going to close public [2:19:15] comment, but we're also going to have a [2:19:17] final statement and rebuttal uh period [2:19:19] for um the appellant, and we can ask any [2:19:23] final questions of the appellent at that [2:19:25] time. [2:19:34] » Welcome, Ryan. Thank you very much. Um I [2:19:38] will try to be brief and I think we'll [2:19:39] have a couple brief statements from a [2:19:41] couple members of our team as well. [2:19:44] >> Uh first [2:19:46] the legal standard here uh at the end of [2:19:49] the day you're making a decision. That [2:19:51] decision has a standard that it's held [2:19:52] to. that standard is under the HAA. [2:19:56] Could a reasonable person find that the [2:19:58] project meets the applicable objective [2:20:00] standards? And if so, then under the [2:20:04] law, it does meet those standards. [2:20:07] So, it's not a a substantial evidence [2:20:10] council gets the benefit of the doubt [2:20:12] standard anymore. the law in 2018 under [2:20:16] legislation I contributed to changed [2:20:18] that standard so that if any reasonable [2:20:21] person could find that it meets the [2:20:22] applicable standards than it does by [2:20:24] operation of law. [2:20:27] Um [2:20:29] I'd like to speak to the fire issue. Um [2:20:32] I I respect the community's concern [2:20:34] about fire. However, the state has been [2:20:37] clear on this. Uh, state law forbids [2:20:40] fire hazard severity zone from being [2:20:42] used as a basis to deny ad use. Um, [2:20:46] Calire office of the state fire marshall [2:20:49] information bulletin 25-004 [2:20:53] from March 3rd, 2025 is unambiguous. It [2:20:56] says, quote, fire hazard severity zones [2:20:59] should not restrict the development of [2:21:01] accessory dwelling units. End quote. [2:21:04] Uh Woodside Fire Protection District, [2:21:06] the agency the state has delegated to [2:21:08] enforce fire safety in Woodside, has [2:21:11] already engaged with this project. Um it [2:21:14] will be responsible for ensuring fire [2:21:16] safety. [2:21:17] The hazard designation for this site is [2:21:21] not unique to this site. Uh Ten Still [2:21:24] Creek Road sits in the same very high [2:21:27] fires hazard severity zone as [2:21:29] essentially the entire western hills of [2:21:31] Woodside. It is not unique [2:21:34] and the applicant's engineered fire [2:21:36] safety package equals or exceeds every [2:21:39] applicable code. self-imposed two-hour [2:21:42] fire rating, steel structural framing, [2:21:44] metal cladding, class A roof, [2:21:46] pebblestone non-combustible zone zero, [2:21:49] 100 ft lean, clean green defensible [2:21:51] space, mandatory NFPA 13D interior [2:21:55] sprinklers, plus exterior wildfire [2:21:58] defense sprinklers of the kind credited [2:22:00] with saving homes in the 2025 Palisades [2:22:03] fire. Cal Water Hydrant Fire with 600 ft [2:22:07] confirmed by staff. building cited [2:22:10] within 150 ft of the road. So no [2:22:12] apparatus turnaround is required and on [2:22:15] engineering this is simply one of the [2:22:17] most fire hardened projects imaginable [2:22:21] um that probably ever brought to the [2:22:23] town [2:22:25] and a formal vegetation management plan [2:22:27] while not required is being provided. [2:22:31] The exception [2:22:33] is what is being considered here today, [2:22:35] not the fire risk of the project. And [2:22:37] the exception does not increase fire [2:22:40] risk. So there may be concerns about [2:22:43] building in urban wild fire wildlands [2:22:46] interfaces, [2:22:47] but the thing before the council tonight [2:22:49] is the exception and the exception is [2:22:52] not implicated by those concerns. the [2:22:54] exception of having this much setback or [2:22:57] this much setback is it's a marginal [2:23:00] difference and it does not actually [2:23:02] impact fire risk [2:23:04] under the state law. If the council were [2:23:07] to deny the project or condition it in a [2:23:09] manner that renders it infeasible, [2:23:12] renders it impossible to to feasibly [2:23:15] build. Um the standard there is that [2:23:20] there is no alternative uh that it it [2:23:23] violates an accepted quote objective [2:23:27] identified written public health or [2:23:29] safety standard policy or conditions at [2:23:32] the as they existed on the date the [2:23:34] application was deemed complete. So [2:23:36] while there are concerns generally about [2:23:38] building in urban wildland interface [2:23:42] areas, there is no objective quantified [2:23:46] standard that has been implicated here. [2:23:48] There is no standard that we can point [2:23:50] to and say this is violated by the [2:23:52] project. It imposes a health and safety [2:23:54] risk of this standard of this quantified [2:23:57] magnitude and therefore that cannot be [2:24:00] used to deny the exception to deny the [2:24:03] project. State law does not allow that. [2:24:06] And [2:24:08] the the likely impact of that if this [2:24:11] were to go into an argument at the next [2:24:14] level about this, we've already said [2:24:16] it's it's five $50,000 per unit tonight [2:24:19] plus the attorney's fees. We're looking [2:24:21] at probably a million dollar bill to the [2:24:22] city to the town if it goes that way. [2:24:25] So, we don't want that. I'm not here to [2:24:28] threaten the town. I haven't been asked [2:24:30] by my clients certainly to threaten the [2:24:32] town. I'm here trying to explain why the [2:24:34] state law requires approval of the [2:24:36] project and approval of the exception. [2:24:39] Um there was one uh item that the [2:24:41] engineer I think wanted to add the [2:24:43] actual cost. If the exception were [2:24:46] denied, we have to build into the [2:24:48] hillside excavate dramatically more [2:24:50] soil. The offhaul cost, Charles, can you [2:24:54] speak to that? the additional cost of [2:24:57] offhaul. [2:24:58] >> Uh the architect said I think it was [2:25:00] 1,400 cubic yards additional excavation. [2:25:03] Is that correct? [2:25:05] If Jim's listening, [2:25:07] >> it is it is um about 1,600, [2:25:12] 1645 total yards would have to be. [2:25:14] >> Okay. I had earlier I had forgotten [2:25:16] about I was thinking the construction [2:25:18] cost but there's the offhaul to the [2:25:19] landfill [2:25:21] and that alone would be in the [2:25:24] neighborhood of $200 to $300,000 [2:25:26] and probably 350 [2:25:29] maybe more truck trips dump truck trips [2:25:34] through Woodside up to the property down [2:25:36] Sil Creek Road and back out Still Creek [2:25:38] Road through Woodside to 280. [2:25:41] So, um, if I were a neighbor there, I [2:25:44] don't think I would like that. And I [2:25:47] wanted to say something else, but I [2:25:48] guess I'll I'll let this part of it wrap [2:25:50] up first. I Okay, I'll finish. Uh, [2:25:53] someone else said that um [2:25:56] Dr. Clamper said there's a he suggested [2:25:58] there's an active fault going right [2:26:00] through the site. That's not true. The [2:26:02] nearest active fault is a mile away. The [2:26:04] Pillar's fault is considered potentially [2:26:08] active. this the state the California [2:26:10] Geological Survey does not even have it [2:26:12] on their map as an active fault or [2:26:14] special study zone or it would never [2:26:16] even came up in our geotech report [2:26:18] because it's just not an issue. It's 250 [2:26:21] or 300 ft down the hill from the site. [2:26:23] It trends up toward the intersection of [2:26:25] Still Creek Road, uh, Sunrise Drive, and [2:26:29] Skywood Way, right under that house at [2:26:32] the corner there, and very close to [2:26:33] number three, Still Creek Road. [2:26:37] And the site is also not on an active [2:26:40] landslide. It's on a dormant landslide. [2:26:42] And that's why we did an extensive study [2:26:45] after which we determined that it is re [2:26:48] it is stable at this time. [2:26:53] Thank you. I believe architect Jim [2:26:55] Baronssky is going to address the [2:26:58] alternatives that were profered by the [2:26:59] neighbors architect. Thank you. [2:27:02] >> Thank you, James. [2:27:03] >> Yeah, I I'd just like to point out that [2:27:07] uh Mr. French's alternative relies on [2:27:11] these areas that are within the 50oot [2:27:13] setback. Um the area uh the area that is [2:27:18] closest to the road uh that is not [2:27:21] encroached upon by a 35% slope or 50% [2:27:26] slope is 771 square ft. And that's a [2:27:29] misshapen 771 square ft. That means that [2:27:34] to even get a just a a rectangular [2:27:38] box that would fit in there that would [2:27:41] not have to encroach in the in the 50 [2:27:43] foot setback or 50% slope area would be [2:27:47] 467 square ft. Um and I'm you know uh [2:27:52] maybe that's an alternative but it's [2:27:54] certainly not a feasible one. And then [2:27:56] with respect to the area that is to the [2:27:58] north and the east, that whole area is [2:28:02] 1,54 [2:28:04] square ft that is not encroached upon by [2:28:07] the 35% slope or the 50% slope. If I [2:28:11] wanted to put in a rectangular box that [2:28:13] did not encroach, it could be 443 square [2:28:16] ft, which is not even large enough for a [2:28:18] twocar garage. So, I just don't [2:28:22] understand how that's feasible unless we [2:28:25] encroach into the 50 50% um uh slope [2:28:30] area, which frankly we're not really [2:28:33] allowed to do, nor do we want to do. Um, [2:28:36] and then I I stand by my analysis on the [2:28:39] uh on the size of the building um and uh [2:28:44] the mis uh misreading of Mr. French's or [2:28:48] Mr. French's misreading of our plans um [2:28:52] uh and uh uh of the uh maybe the [2:28:55] guidelines uh for uh calculating um a [2:29:00] building area for for Woodside. So I [2:29:03] know our calculation is correct. [2:29:06] >> Okay. Thank you. [2:29:08] >> And David, [2:29:14] » thank you. Something that has been [2:29:17] glossed over tonight is this [2:29:20] conversation is about the setback. Once [2:29:22] the setback has been decided with an [2:29:24] exception or not, if we if we choose [2:29:27] when we choose to move forward with the [2:29:29] project, we have to comply with all the [2:29:32] codes that currently sit in California [2:29:36] to build a house. That includes chapter [2:29:38] 7A, [2:29:40] which is the fire requirements for a [2:29:43] house. Not one of the houses in Skywood [2:29:45] Acres was built to that standard. And [2:29:48] part of what Mr. Parker glazed over in [2:29:51] those reports from Lahina and Palisades [2:29:53] is that houses built to 7A survived. If [2:29:58] any of you remember the CBS story of [2:30:00] that one house in the one neighborhood [2:30:02] in Palisades that seemed to be unburned, [2:30:04] it's because it was built to 7A. [2:30:10] Additionally, the access in the road the [2:30:13] road code, there's three structures [2:30:16] after that section of road. And the code [2:30:19] requires that for three structures that [2:30:21] the road have a minimum width of 14 ft. [2:30:23] And it's been accepted by everybody in [2:30:25] this room that the road is at least 18 [2:30:27] ft and wider in some places. [2:30:32] regarding the road maintenance and the [2:30:35] public private. [2:30:37] This all started in 2019 when California [2:30:40] amended their civil code 845. [2:30:46] We had a road maintenance agreement [2:30:49] between four property owners with [2:30:50] accordments. [2:30:53] That code changed to say that in the [2:30:55] absence of a road maintenance agreement, [2:30:57] each property owner was responsible for [2:31:01] the road maintenance proportional to [2:31:03] their use of the road. And we had four [2:31:07] other properties on the road that have [2:31:10] implied easements that aren't recorded. [2:31:13] 105 Sunrise. This driveway comes out. It [2:31:16] has a 20 foot set back to the the [2:31:18] garage. Three Still Creek, Seven Still [2:31:21] Creek, and 95 Skyward second driveway. [2:31:26] After multiple attempts of trying to get [2:31:28] everybody to sit down at the table and [2:31:30] agree, I was encouraged to come to the [2:31:33] town and push for public acceptance of [2:31:36] the road for a lot of the reasons that [2:31:38] Kristen spouted, but also because the [2:31:41] town has a equestrian trails easement [2:31:44] that goes down the road. And we actually [2:31:45] went to the equestrian trails committee [2:31:47] at the very beginning as well as county [2:31:51] parks, the fulier estate and the town [2:31:55] because those conservation easements on [2:31:57] 10 Steel Creek. [2:32:00] The easement says the town shall [2:32:02] maintain that conservation easement, not [2:32:04] us. [2:32:06] which means that you have an implied [2:32:08] easement on the road to get to our [2:32:10] property to maintain the conservation [2:32:12] easement. [2:32:16] We have never denied that we're going to [2:32:20] repair the road, but we have to agree on [2:32:24] what the quality and the state of the [2:32:26] road is so we can repair it back to that [2:32:30] state. It's unfair [2:32:33] to put a whole new road in if we don't actually do that [2:32:38] much damage to the road by not hauling [2:32:40] 1643 [2:32:42] cubic yards of dirt out of the property. [2:32:48] And it's been talked about how the moan [2:32:49] washed out. The moon washed out on the [2:32:52] property of 45 Steel Creek beyond where [2:32:54] this site is. It washed out not because [2:32:58] of geotechnical issues but because of a [2:33:01] lack of the property owner's [2:33:02] responsibility. [2:33:04] Poppy owner's fulfillment of his [2:33:06] responsibility to clear his own covert [2:33:09] that created overflow which is the same [2:33:11] reason why 84 washed out. [2:33:14] He failed to mention that the estate [2:33:20] of the news paid tens of thousands of [2:33:23] dollars towards that repair. And if you [2:33:26] remember the first meeting of January [2:33:28] 2023, I came in here hot to tell you [2:33:32] about how this road needed to be public [2:33:35] is me, Kristen, and my 70 plus year old [2:33:39] father went and cleared that covert [2:33:42] because he was in Tahoe on on New Year's [2:33:45] Eve of 2022. So, we didn't do that [2:33:48] again. And we don't even live on the [2:33:51] road yet. [2:33:54] Again, that's part of the road beyond [2:33:57] the project and would be unaffected [2:34:01] by construction. [2:34:05] Yeah, I think that's all I wanted to [2:34:07] say. [2:34:09] >> Thank you. Any questions from councel [2:34:11] for the appellent? [2:34:14] The applicant? [2:34:17] Okay. Well, [2:34:19] uh, [2:34:22] what can I get opinion on if we if we've [2:34:25] closed public comment? [2:34:26] >> You did indicate you had already closed [2:34:28] public comment and you were doing a [2:34:30] rebuttal for the appellant. [2:34:32] >> Yeah. So, yeah, public comment is [2:34:35] closed. Um, and so we are closing public [2:34:38] comment and we are closing the public [2:34:40] hearing. Um, [2:34:44] so, uh, I want to make a suggestion. [2:34:47] It's probably not going to make a lot of [2:34:48] people thrilled. Uh, but David Madrid's [2:34:52] letter is actually correct. The opening [2:34:55] letter we heard tonight, which is we [2:34:56] need this to be a fair process, and we [2:34:59] on the council have not had a chance to [2:35:00] digest about 400 pages that came from [2:35:03] the applicant and the neighbors today. [2:35:06] Uh so Jennifer did the best job she [2:35:09] could to copy that for everybody. Um uh [2:35:12] not all of us are present with a [2:35:13] physical copy but none of us have had a [2:35:16] chance to really digest this and so uh [2:35:19] this process in order to have validity [2:35:21] needs us to be able to do that. Um so [2:35:25] what I'd like to do is suggest a [2:35:26] continuation and we will commit to a [2:35:29] timely response here. We're I know we're [2:35:32] starting to stack extra meetings in [2:35:33] June. So hopefully we can get this in [2:35:35] May or early June, but um I would [2:35:38] suggest that that's what we need to do [2:35:39] in order to digest this to make sure [2:35:41] that we've we've given this everything [2:35:43] it it it deserves after 5 years. Uh so I [2:35:46] would like to make that motion uh [2:35:48] tonight. I don't know if there's a [2:35:50] second or interest. We can also continue [2:35:53] tonight. [2:35:54] >> You agree? [2:35:56] >> Agree. [2:35:57] >> I agree with that suggestion. I have not [2:35:59] had an opportunity to read all those [2:36:00] either. [2:36:02] >> Council member Wall, where are you on [2:36:03] this? [2:36:05] >> Yeah, I I agree. I think um I think it's [2:36:08] important that we have the time to [2:36:10] review the materials that were submitted [2:36:12] today. So, I would second your motion. [2:36:15] >> Okay. Thank you. For planning purposes, [2:36:18] can we pick a day right now? Can we pick [2:36:20] the second? [2:36:21] >> I was going to ask if the council could [2:36:23] um pick a date certain so we didn't have [2:36:25] to renotice the hearing. [2:36:26] >> Yeah. So if um your options would be May [2:36:28] 26th or June 9th I think it is. [2:36:32] >> I think we owe it to everybody to be as [2:36:34] fast as we can on the turnaround. So May [2:36:36] 26th [2:36:36] >> May 26th. [2:36:38] >> Okay. May [2:36:39] >> May 26th. Okay. [2:36:41] >> And uh yeah, we'll commit. We're going [2:36:43] to open at that point in deliberation. [2:36:45] So there will be no further public [2:36:46] comment. We have closed public comment. [2:36:48] Um so we will just be deliberating and [2:36:50] then making a decision at that time. So [2:36:54] um [2:36:55] so with that we will close this item for [2:36:58] tonight. It's continued to May 22nd [2:37:00] where we will open [2:37:02] >> 26. [2:37:02] >> Thank you. May 26 where we will open [2:37:06] with council deliberation and get [2:37:09] everybody on the road. Uh [2:37:12] okay David one last [2:37:14] >> just one question so we don't end up in [2:37:16] the same position at the continuence. [2:37:18] For clarification, are you accepting [2:37:21] desk items or not from that continuance? [2:37:23] >> We've been told no. The public hearing [2:37:26] is open. [2:37:26] >> Thank you. [2:37:29] >> The main thrust of David Madrid's letter [2:37:30] was that we hadn't had a chance to [2:37:33] respond to this massive submission yet. [2:37:34] So, there needs to be some mechanism for [2:37:36] us to respond to it or it's pointless to [2:37:38] continue. [2:37:39] >> Jean, [2:37:42] >> logic that one. [2:37:44] >> Well, it it it seems incredibly unfair. [2:37:47] So, so I think [2:37:48] >> the applicant gets to rebut and we have [2:37:49] none. [2:37:50] >> Hold on, please. [2:37:51] >> So, I think what I heard you say is that [2:37:53] you you've heard all the public comment [2:37:56] um and you need time to take a look at [2:37:58] additional information that's been [2:38:00] provided to you. What I would suggest is [2:38:03] that if you think there are additional [2:38:05] questions you need to pose as a result [2:38:07] of that, you could do that at the next [2:38:08] meeting. Um but you've already indicated [2:38:11] that you're you're closing the public [2:38:13] hearing. [2:38:13] >> You know, I um and I appreciate that. I [2:38:16] would it be okay if we said we can take [2:38:19] public responses to anything in these [2:38:21] 400 pages? [2:38:23] >> Um you can say that but if you if you [2:38:25] are going to do that I think you should [2:38:27] be clear with the people who are here [2:38:28] are you saying you will take written [2:38:30] comments [2:38:31] >> written? Yep. Written. [2:38:33] >> And then if you could please indicate by [2:38:35] which date you would like those to be [2:38:37] submitted so that you don't end up in [2:38:39] the same situation which is things [2:38:41] coming in two hours before [2:38:43] >> uh you hear it on May 26th. [2:38:45] >> I don't have a calendar in front of me. [2:38:46] What's one week from today? [2:38:48] >> One week from today is May 9 Tuesday May [2:38:50] 19th. [2:38:51] >> Okay. We will take any written [2:38:53] communication in response to the items [2:38:55] that are in that have been submitted [2:38:57] today uh by May 19th. [2:39:03] in writing. Correct. [2:39:04] >> In writing. [2:39:06] >> Yeah. And I'm sorry that this seems like [2:39:07] a little jarring moment, but we don't we [2:39:10] just can't we can't process this [2:39:12] information tonight. So, [2:39:13] >> understood. The neighbors also submitted [2:39:15] new materials today that we would like a [2:39:16] chance to respond to. [2:39:18] >> Fair enough. Yes. Yep. [2:39:19] >> And I also want to note for the record, [2:39:21] this was the fifth hearing. [2:39:23] >> So, there is a state law issue there as [2:39:25] well. [2:39:25] >> Well, we're it's a staff table. We would [2:39:28] >> Yeah. So, we're continuing in uh a [2:39:31] current meeting is the way I think we [2:39:32] would look at that, but um we're doing [2:39:34] our best on this. All right. We want to [2:39:35] make sure everybody gets a fair a fair [2:39:37] hearing on this. [2:39:40] >> Okay. Thank you. [2:39:42] >> Everything writing within one week. Yep. [2:39:44] >> Nothing after that. [2:39:46] >> Sounds we open up at deliberations. [2:39:48] >> At deliberation. [2:39:49] >> Okay. [2:39:51] >> Thank you. [2:39:52] >> You know, we we had a we had a vote. We [2:39:54] had a motion in a second, but we didn't [2:39:56] take that vote. Do we need to take a [2:39:58] vote for continuation? Yes. [2:40:01] >> So, I'll make a motion. [2:40:03] >> Yep. [2:40:04] >> That we continue this item [2:40:07] uh [2:40:09] to May 26th. [2:40:11] Um and we open at deliberations and any [2:40:16] comment either pro or con from the [2:40:19] appellants or the uh neighbors [2:40:24] um should be made within one week from [2:40:26] today in writing only and they will not [2:40:29] be accepted after that date. [2:40:31] >> Second. [2:40:33] >> Council member Alish. [2:40:34] >> Yes. [2:40:34] >> Council member Brown. [2:40:35] >> Yes. Council member Gold. [2:40:36] >> Yes. [2:40:37] >> Council member Wall. [2:40:38] >> Yes. [2:40:39] >> Mayor Donowski. [2:40:40] >> Yes. [2:40:42] Thank you. [2:40:45] Appreciate your time and all of your [2:40:47] inputs. [2:40:49] Uh reports, volunteer, [2:40:51] >> no report. [2:40:52] >> Council communication. [2:40:57] » All right. Hearing none. Uh 9:44 we'll [2:41:00] call the meeting.