[0:19] Okay. All right. We're going to go ahead [0:21] and call the meeting to order and think [0:24] we have an echo. We got Okay. We're [0:27] going to begin with the pledge of [0:28] >> allegiance. [0:38] One nation under God, indivisible, with [0:41] liberty and justice for all. [0:46] >> All right. Roll call. [0:47] >> Chair Gar [0:49] >> here. [0:50] >> Vice Chair Tobert [0:51] >> here. [0:51] >> Commissioner Weaver [0:52] >> here. [0:53] >> And Commissioners Evans and Ganero are [0:55] noted absent. [0:58] >> Great. Uh are there any changes to the [1:00] agenda? [1:01] >> Um there are no changes to the agenda. [1:04] Uh however, you have two desk items. Um [1:07] one is from a member of the public. Uh [1:09] she's um brought up some concerns [1:12] related to unpermitted improvements and [1:15] the equestrian trail easement for our [1:18] only public hearing tonight, which is [1:20] item number two. Um she's also uh [1:23] brought up some questions about [1:24] landscaping in the right of way. And um [1:27] in response to that, those are items [1:28] that will have to be dealt with um in [1:31] any event. But it also in response to [1:32] that, we've included a few extra [1:34] conditions of approval uh just to ensure [1:37] that those unpermitted um improvements [1:39] are taken out of the trail easement and [1:42] that they work with the public works [1:43] department uh to determine what if [1:46] anything can remain in the public right [1:48] away regarding the landscape elements. [1:50] Um and then uh lastly in the um desk [1:53] item resolution, it's just a formatting [1:56] change that we're doing with all of our [1:58] staff reports for formal design review. [2:00] It's just the leadin to the findings and [2:02] so we've just revised that for our new [2:04] uh updated format, but it doesn't have [2:06] any substantive change. Um and then [2:09] Jillian will present the project when we [2:10] get to that item. All right. [2:13] >> Okay. Thanks. We're going to move to uh [2:15] public communications. If there are [2:17] members of the public either here or on [2:19] Zoom have a comment about an item not on [2:22] the agenda tonight, uh now is the time. [2:25] And for those online, please use a raise [2:27] hand feature if you'd like to make a [2:28] comment. [2:31] » There are no raise hands. [2:37] » All right. Uh we are going to move on [2:40] then to the consent agenda. So aimed [2:44] tonight, I believe the first item we [2:45] have is the minutes. So uh approval of [2:48] the May 20th, 2026 minutes is the first [2:52] piece. And does anyone have any comments [2:54] on the minutes? Uh as written. [3:03] » I move that the minutes from May 20th be [3:05] approved. [3:10] » Chair Weaver. [3:12] I'm sorry. Excuse me. Chair Gar. [3:15] >> Yes. [3:16] >> Vice Chair Tober. [3:18] Commissioner Weaver. [3:20] >> Yes. [3:20] >> You [3:24] okay? Uh well, in that case, we're going [3:26] to move on to the uh the public hearing [3:29] for the first item, which is 170 Fox [3:31] Hollow Road. [3:46] Uh everyone hope you're having a great [3:48] start to your week. Um, this [3:49] presentation is going to include a brief [3:51] analysis for formal design review uh to [3:53] demolish an existing single family [3:55] dwelling [3:58] school and associated site improvements [4:00] and construction of a new single family [4:01] main residence with an attached garage [4:04] and attached studio ADU. Two detached [4:08] accessory dwelling units, a detached [4:11] trellis, a pool and associated site [4:13] improvements on a lot located at 170 Fox [4:17] Road. The project does require approval [4:20] of a maximum mean resident size [4:21] exception as well as a grading exception [4:24] for site grading in excess of 1500 cubic [4:27] yards. Um the desk items as mentioned [4:30] earlier are pertaining to this [4:32] particular item and the project is [4:34] categorically exempt from the provisions [4:36] of SQA. [4:39] As a quick overview, the subject [4:40] property is about 3.013 acres and it's [4:44] located at the end of Fox Hollow Road. [4:46] It is currently developed with a single [4:48] family main residence, a pool and [4:50] associated site improvements which we [4:52] can see a little bit on the existing [4:53] plans here on the right. Site slopes [4:56] upward from Foxall Road and contains [4:57] numerous significant trees along the [4:59] peripheries of the property. Large [5:01] portions of the existing tree stands [5:03] existing east, south, and west of the [5:05] existing main residence. [5:08] We can see here that the applicant is [5:10] proposed to construct a new single [5:12] family main residence which is the [5:14] L-shaped structure that you see [5:16] approximately in the center of the lot [5:18] here. Um near the general location of [5:21] the existing main home which we can see [5:23] dashed outlined in the center as well. [5:27] Um the attached garage is towards the [5:30] front of the structure where my cursor [5:31] is and then the detached um the attached [5:35] studio ADU is uh partially daylighted [5:37] and it's under this portion of the [5:39] residence. Um this is the proposed pool [5:41] ADU up here. Trellis is dashed over [5:45] adjacent to the pool. And then we have [5:48] new guest ADU adjacent to a proposed [5:50] autoc court. Um the driveway here has [5:53] been rerouted from the lower portion of [5:56] the property frontage to the northward [5:57] portion of the property frontage. Uh we [6:01] can see that outlined here in the darker [6:03] gray. [6:06] Here's a quick overview of the main [6:08] residence elevations. [6:11] Um we can see that the main residence [6:14] employs one and twostory elements. Um [6:17] which helps to break up that massing a [6:19] little bit. Um, we have covered patio [6:21] spaces adjoining adjoining the front and [6:23] the rear property facads and the [6:26] building contains medium to high pitch [6:28] gable roofs connected by a series of [6:30] small breezeways. [6:32] Um, we can see that there is also some [6:35] glazing that is oriented towards these [6:37] outdoor living spaces. [6:41] The form of the accessory uh dwelling [6:43] units that are detached from the main [6:45] house are complimentary to the main [6:46] house structure. where they have medium [6:48] pitch gable roots as well. Um, and you [6:52] can see uh relatively low visual [6:55] footprint on that trellis adjacent. [7:00] Here's a brief overview of the colors [7:02] and materials palette. You also have [7:04] physical material samples to your left [7:06] on the table uh for a little bit of a [7:09] better idea of what those look like in [7:10] person. Um the main house contains [7:13] weathered wood siding, rubble stone [7:15] walls, standing sea metal roofs, patina [7:17] steel doors, windows, metal railing, and [7:19] metal cladding. Um we have an assortment [7:22] of earth tones including browns, grays, [7:25] um charcoal gray leaning towards black [7:28] and um similar materials are being [7:31] proposed in conjunction with the [7:32] detached ADUs including wood siding, [7:34] steel doors and windows, stone veneer, [7:36] and standing seam metal roofs as well in [7:38] the same colors and materials palette. [7:41] On September 15th of last year, this [7:44] project did go before the architectural [7:46] and site review board for conceptual [7:47] design review. The applicant was [7:49] commended for their colors and materials [7:51] choices as well as their simple forms, [7:53] but the ASRB did request that they make [7:56] some tweaks to the fenistration on the [7:58] building as well as um the site grading [8:01] to minimize that to the greatest extent [8:03] possible. The project did return on May [8:06] 18th for formal design review and at [8:09] that time the architectural and site [8:11] review board deemed that the project had [8:13] satisfied all their outstanding design [8:16] concerns. [8:20] Um big meat of tonight's analysis will [8:24] be pertaining to the grading exception [8:26] um which is the planning commission [8:29] angle that was not addressed by the [8:30] architectural insight review board. As [8:33] mentioned earlier pursuant to section [8:35] 151.22 of the municipal code. Um this [8:38] grading exception is required because [8:40] the grading for the proposed site [8:42] exceeds 1500 cubic yards. We have a pro [8:46] a proposal of approximately 2560 cubic [8:48] yards of sight specific grading that [8:50] doesn't include things such as like the [8:52] basement or the pool cuts. Those are [8:54] excluded from that valuation. Um the [8:56] municipal code does allow the planning [8:58] commission to approve a site grading [9:00] exception so long as the findings that [9:02] you can see here on the right side of [9:04] the slide are met. After reviewing the [9:07] proposed project, staff believes that [9:09] the project plans meet the findings [9:10] required to grant a grading exception. A [9:13] comprehensive review of the overview of [9:16] um the stat the staff determination is [9:18] available in the staff report if you [9:19] want details regarding uh the detail uh [9:22] sorry the various facets of the project [9:25] that came to that determination. Um but [9:27] we are happy to provide an overview of [9:29] both the required findings as well as [9:33] the project details that we believe [9:35] support the findings if additional [9:37] information is required from you. [9:39] >> We ask questions now or should we wait [9:40] till the end of the presentation? Um, [9:43] that's the brief overview of everything. [9:47] Um, I just want to flag we do have [9:49] members of the team here available to go [9:52] over both the architectural angle and [9:53] the grading angle. Um, so if you have [9:56] anything that's not clearly covered by [9:58] the staff report, they will be able to [9:59] help. But otherwise, I'm able to answer [10:01] some question. [10:02] >> I just had one actually on the on on [10:03] this slide particularly which is just so [10:05] we're understanding the finding, right, [10:08] which is [10:09] >> the constraints finding. Mhm. [10:11] >> So when it's saying there no significant [10:13] physical constraints related to grading. [10:15] So just want to make sure I'm reading [10:16] this correctly which is if if lock [10:19] configuring topography [10:21] uh removal of significant trees. So it's [10:23] basically saying that we have to find [10:24] that there's no removal of significant [10:28] trees required or is it are we [10:31] interpreting that correctly? [10:36] Um I think it's to look at this kind of [10:38] holistically with all of these different [10:39] items. So any one of these things could [10:41] be a significant constraint to grading. [10:43] Um so uh trees sometimes are a [10:46] significant constraint. Uh you know it [10:48] doesn't mean you can't remove any trees [10:50] but an effort to try to preserve some of [10:52] the trees on site. Um sometimes that has [10:54] to do with why grading is occurring. Um [10:57] other times you may be dealing with [10:59] other constraints such as septic systems [11:01] and areas where you sometimes can't um [11:05] balance your grading on site. Those are [11:07] other things that are considered. So, [11:08] it's just kind of looking at each of [11:09] those items and are are those things [11:12] that uh would not be significantly [11:15] impacted by the proposed grading. Um, so [11:18] you would not impact your septic [11:19] systems, your groundwater, the you know [11:22] landslide areas, all those things would [11:23] have to be dealt with appropriately. [11:27] >> Thank you. [11:33] Um that's pretty much the overview of [11:36] the project. As mentioned, um detailed [11:38] findings are available in the staff [11:40] report as well as the draft resolution. [11:43] Um, but happy to answer any questions [11:45] pertaining to how staff came to our [11:47] recommendation or any further questions [11:50] on the grading exception in and of [11:52] itself or if you have any questions on [11:53] the maximum main resident size exception [11:56] which is also um needed for approval in [11:58] conjunction with this project. Happy to [12:00] help answer any questions. [12:06] » Yes, I had a couple of brief questions. [12:09] Um in this case the maximum resident [12:12] size exception is purely formulaic and [12:16] if the grading exemption was not [12:18] required this uh particular project [12:21] would not have come to planning [12:22] commission. [12:23] >> That's correct. [12:23] >> Okay. Um the second question is related [12:27] to equestrian access [12:30] along the rightway on Fox Hollow Road. [12:34] um made a second site visit this [12:36] afternoon with that in mind and it looks [12:40] like going on Fox Hollow Road that the [12:43] horse path such as it is [12:46] um crosses the road a couple of times [12:49] based on the slope immediately where the [12:52] asphalt ends and where trees are and and [12:55] so it goes back and forth across the [12:57] road. Does the town ha um [13:03] if the town uh by virtue of the road has [13:06] an easement along both sides of the [13:08] road, do we actively defend the easement [13:11] on both sides of the road if on one side [13:14] of the road it's clear that there really [13:17] isn't any effective um um equestrian [13:20] access? [13:25] So, it's a public road, so I' I'd have [13:27] to look at maps, but my guess is that [13:29] the trail is it within the public right [13:31] of way. Um, so it wouldn't necessarily [13:33] be uh a dedicated easement. So, um if [13:37] there's any trails within the right of [13:39] way, they're allowed to be there. They'd [13:41] be maintained and um the way they're set [13:44] up is usually what how best suits the [13:46] topography or what's been out there. Um [13:48] but trail easement on the property, [13:50] that's a dedicated easement. the town um [13:53] maintains those easements. Uh but as [13:56] noted earlier, they'll have to [13:58] >> but the rule is you're not allowed to [14:00] have an improvement on the easement even [14:03] if it's an impracticable easement from [14:07] the standpoint of walking or riding or [14:10] being used at all. [14:11] >> There's encroachment permits can be [14:13] granted an easement similar as they are [14:16] in public rightways. Um, trail easements [14:19] are generally to be kept free and clear, [14:21] but if there's some reason for some type [14:23] of improvement, that would be looked at [14:24] by public works and technically the [14:27] process would be to get an encroachment [14:28] permit. [14:30] And then the final point would be in the [14:34] context of looking at equestrian access [14:38] to the trail that runs along the edge of [14:40] the property where that is located at [14:44] the very end of the culdesac [14:47] where a number of properties come [14:49] together. They're quite large [14:51] properties. They have nice outdoor [14:53] landscaping. They have pools. I suspect [14:56] that quite often people would have [14:58] rather large parties out there. And the [15:03] question came up in my mind is [15:06] um does the town ever put up no parking [15:10] signs where the trail access point [15:13] begins to ensure that during a party [15:16] that the valet doesn't block the [15:18] equestrian trail access? [15:20] >> That's a good question. Um I have to [15:23] talk to public works. I I mean I think [15:25] it's something we can easily pass on to [15:26] them as a concern. Uh and because you [15:29] were correct obviously it'd be very bad [15:32] if they blocked the trail and the horse [15:34] was trying to get out of it especially. [15:37] I mean I know that there are other [15:39] locations where such trails start and [15:43] there's a gate but like in my [15:46] neighborhood I know that there are [15:48] certain locations where in 20 years I've [15:50] never seen vehicles parked but it seemed [15:52] like out here at the end of the [15:53] culde-sac that that would be a prime [15:56] location for the equestrian trail to be [15:59] blocked by vehicles parked there. [16:02] >> Yeah. No, that's it's a very good [16:03] question. We'll definitely follow up [16:05] with public works to see if some I think [16:07] some good signage there would be [16:09] important. [16:10] >> That is all I had. [16:17] » Well, a few questions. Um, and we'll [16:19] probably get into them a bit more when the applicant presents as well, but [16:24] just interested in the ASRB sort of the [16:26] context of some of the discussion there. [16:28] Mhm. [16:28] >> Um, you know, so I went went to the site [16:31] earlier and and and looked at it and I [16:33] mean it's interesting that the mask kind [16:35] of hits you when you when you go there [16:37] it's it's uh it's it's sort of oh that's up there kind of turning your [16:42] head up which is a little bit uh not not [16:45] super typical in Woodside. Um and I'm [16:47] sort of interested in in the discussions [16:49] around you know mass and bulk. saw they [16:50] had um asked about the the sort of the long or the short ends, right? And and sort of stepping back which um [17:00] which it looks like was done in a in an [17:01] iteration. At the same time, there's the [17:04] longest sort of [17:06] um lack of a better term sort of slab [17:09] sides of the twotory structures are, you [17:12] know, single material, [17:15] no variation in terms of all of that, [17:17] which [17:18] when I look at the design guidelines, [17:20] mass and bulk, it's it's a little bit [17:22] different in terms of how that reads [17:23] versus what I see in the design. I'm [17:24] just curious, was that discussed in [17:26] ASRB? because I saw them sort of [17:28] commending but at the same time some of [17:29] these pieces seem a little bit different [17:31] than what we see in the design [17:32] guidelines. [17:33] >> Yeah, absolutely. Um I did pull a couple [17:35] slides um kind of showing the changes um [17:39] that occurred between conceptual and [17:42] formal design review. Is that showing up [17:43] for you guys on the screen? Okay. Down [17:45] there. Okay, great. Um so actually they [17:48] did commend the materials pallet [17:51] especially um and the simple forms of [17:53] the structure. So those were areas that [17:55] they actually highlighted some [17:57] appreciation for um as seen in the CDR [18:00] action letter. Um their primary concerns [18:03] as it pertained to the actual structures [18:06] um and these were matters that were [18:08] rectified prior to formal design review. [18:11] You can see here um CDR difference [18:13] between [18:14] the fenestration that we see on the [18:17] south and north elevations. Um they did [18:20] some substantial decreases um in the [18:23] amount of windows and glazing on the [18:25] facades of the buildings uh just because [18:27] they had expressed concerns regarding [18:29] light emission. But that was really the [18:31] central piece of commentary from the [18:34] architectural and site review board as [18:35] it pertained to the actual structure [18:38] designs. Um and they felt as though [18:41] these modifications as we see on the [18:43] lower level here had sufficiently [18:45] rectified those concerns. In all out, [18:48] they they did discuss the the mass. I I think it'd really at the they they um [18:54] they kind of looked at the simplicity as [18:56] a positive and with that, you know, be [19:00] given the different kind of wings at the [19:01] end with the lower levels. Uh they [19:03] didn't have any direction to further [19:05] break up this larger center mass. [19:09] You next question is about so about the [19:11] grading itself. Um so the the finding [19:15] that it was you're asking about the [19:17] language of before so finding a where [19:19] it's talking about essentially [19:20] constraints on the the grading right uh [19:25] it does seem like there's removal of [19:27] trees that are associated with this [19:30] >> and so can you talk a little bit about [19:32] maybe take us through some of the [19:33] details on uh how the specific areas of [19:37] grading [19:40] well essentially just how that all ties [19:42] together, right, in terms of tree [19:44] removal and grading and relocation of [19:46] the driveway, etc., etc., etc. [19:48] >> Yeah, absolutely. And the applicant can [19:50] speak in a little bit more detail. Um, [19:52] are you specifically concerned with the [19:54] ASRB's initial comments regarding [19:56] grading and topography um relative to [19:59] this constraint or um more so to the [20:02] constraint itself relative to the final [20:04] site condition? I mean really trying to [20:05] understand if if if we can make the [20:07] finding as contingent on you know those [20:09] constraints not being there. So I'm just [20:12] trying to get get a sort of more [20:14] intuition for the degree to which things [20:17] like the trees etc are potential [20:19] constraints. Does that make sense? [20:21] >> Okay, perfect. Sounds great. Um so [20:23] here's a brief overview of the [20:25] comprehensive site plan. Um we can see [20:28] in here tree removal marked in the small [20:31] red X's. Um, and as you can see [20:34] throughout the site, um, these bubbled [20:38] areas are representative of existing [20:41] tree canopies that exist on the [20:43] property. Um, so much like with other [20:45] woodside properties, we're operating [20:47] under a condition that there are some [20:50] substantial quantities of trees out [20:51] there. Um, and the code does allow for [20:55] tree removal in conjunction with [20:58] approved development permits. Um, in [21:01] reading the applicants narratives [21:05] regarding their grading selection and [21:07] the locations in which they've chosen to [21:09] orient their structures, um, one of the [21:11] primary goals that they had highlighted [21:13] was retaining the most significant [21:14] amount of trees possible, especially as [21:17] it came to um, balancing site grading. [21:20] Typically, you'd be wanting to balance [21:22] those quantities per the requirements of [21:24] the code. um they are doing um an [21:27] exception to balancing to avoid [21:29] potential impacts and fill and cut uh [21:32] regarding to those existing on-site [21:34] trees. Um a lot of this orientation of [21:38] the site is centered around existing [21:41] development to the greatest extent [21:43] possible. We can kind of see as [21:44] mentioned earlier we do have the dashed [21:47] existing structure. this lawn area does [21:50] have a significant degree of overlap [21:52] with the existing flat topography on the [21:55] property. Um so there are areas in which [21:58] tree removal is being done in [22:00] conjunction with the proposed [22:02] improvements. However, uh given that the [22:05] site is heavily vegetated um to some [22:09] degree the tweaking kind of runs us up [22:11] against that problem regardless. Um but [22:15] I think the applicant can speak in [22:17] greater detail if there's anything uh [22:19] regarding specific tree removal [22:21] specifications. [22:23] Um but they did highlight that that was [22:26] essential part of their grading design [22:28] was um minimizing impact on those [22:30] existing trees as much as possible [22:32] especially as it pertained to balancing [22:34] fill on site. And yeah, I'll just add as Jillian's noted the the tree removal [22:39] are some of the smaller trees and [22:41] they're in the areas of the proposed [22:42] development for primarily the structures [22:46] um but some with the autoc court and [22:48] then they you know they've chose to [22:51] redirect the driveway um but they're [22:54] also trying to be careful of avoiding [22:56] those larger trees in the front. That's [22:58] part of some of the grading that [23:00] occurred for the driveway. And then per [23:02] the ASRB's recommendations as well, [23:04] we'll ensure that there's an arborist uh [23:06] report completed um and that the they [23:10] have an arborist on site specifically [23:12] with any of the grading around the [23:13] trees. [23:17] » Okay. Can you help point out on this [23:19] diagram [23:22] it looks like it's the red [23:27] » Sorry if the resolution's a little bad. [23:29] Pull up the site plan. So, um, we have [23:33] this is kind of showing the development [23:34] on the lower half of the property. I'll [23:36] scroll up whenever you're ready. Um, [23:38] just that you can see kind of the tree [23:40] removal on the upper portion. [23:42] >> You'll see the one in the autoc court [23:44] and then couple in the footprint of the [23:46] buildings. So, that's the ADU and then [23:49] that's the main residence and then [23:51] there's some more um kind of near right [23:54] near the other accessory structures and [23:57] the pool area. [24:02] Okay, sounds good. Yeah. Do we do we [24:06] have in the plans the the details of [24:08] those? [24:12] » Yeah, I can there [24:14] >> pull it up real quick. I'm going to get [24:17] the higher resolution up so we can [24:18] actually read. [24:50] Oh, was sorry didn't switch over. [24:53] looking at something completely [24:54] different than you guys. [25:30] So, um, not clearly xed out on here, but [25:34] you can see some of the labeling here. 6 [25:38] in oaks, 10 inch oaks. [25:42] Within the footprint, you have 10.1 [25:46] by one. [25:52] » They're significant trees or I'm looking [25:55] here. It doesn't look like they're [25:57] >> Yeah, there. So, so I'd have to remember [25:59] the certain sizes. Um, some of those are [26:02] close to significant or maybe like that [26:04] 14-inch oak be a significant tree. Um, [26:07] yeah, I think a 13 inch once you get to [26:09] the 10 in and below, um, those would not [26:11] be significant trees. Um, just a [26:14] reminder to us all when you say 13-inch [26:16] tree, is that diameter or circumference? [26:18] >> Very good question. That's diameter. [26:36] to [26:50] » good evening. Jim, Toby, Liam Braves [26:52] Engineering, um with Civil Engineers on [26:53] the project. And as um Julian and Sage [26:56] are showing you here, you can see a lot [26:57] of the trees, they're um kind of xed [26:59] out. But um as the architect and the um [27:03] design team all together tried to figure [27:05] out what we can do out here, we really [27:07] tried to make sure that some of the more [27:08] major trees, if you kind of go to the [27:10] next page, Julian, if you would please, [27:11] in 2.2, you can see like for instance on [27:14] the left hand side, kind of between the [27:16] driveways over to the left more where [27:18] your cursor is, you see some pretty [27:20] significant trees. Um there's a lot of [27:22] significant trees that have been worked [27:23] around like those are 25 in 24in oak [27:26] trees pretty nicer oak trees than some [27:28] of the ones we're saving also in the [27:30] driveway. Um sorry go back to the other [27:32] page you were just at C 2.1 you can kind [27:35] of see right there you exactly right [27:38] there you can see there's some [27:38] significant trees that that are being [27:40] worked around lit the driveway is [27:42] literally being moved around so it works [27:44] around those existing larger oaks um [27:47] trying to make this work. Um, in terms [27:49] of a lot of the grading on there, you [27:50] know, one of the big things that [27:51] Woodside requires or tries to push on us [27:54] is to try to balance grading. Um, the [27:57] way the code reads in Woodside is that [27:58] the balance, it's the site grading, not [28:00] so much the the foundation and the [28:02] basement grading, but you're trying to [28:03] balance the site grading. And we're [28:05] actually pretty darn close on that based [28:06] on what we're trying to make work. You [28:08] know, it is a big site, but there's a [28:10] lot of constraints in the way. We have [28:11] trees, we have septic, um we have a lot [28:14] of the required items such as firet [28:16] truck access, firet truck turnarounds. [28:19] Um we have to provide a retention pond [28:21] for storm water quality. So there's a [28:23] lot that goes into all this and when you [28:25] start to add all those various things [28:28] together, that's where you start to get [28:29] some of these what look like bigger [28:30] numbers of grading. Um so we really [28:33] tried to do our best to try to balance [28:34] that as much as we could and try to work [28:36] around some of the more grand trees out [28:38] there. Yes, there's some trees that are [28:40] going to be going, but they're more of [28:41] the smaller trees for the most part and [28:43] trying to work around everything. So, [28:46] um, and trying to take all of those [28:47] various things into consideration. Um, [28:51] we have a 3acre plus site here. Um, we [28:53] have a lot of requirements that we have [28:55] to work around and that's how we kind of [28:56] came up with some of the numbers we did, [28:58] but we did our best to try to balance as [29:00] much as we could on the property. [29:03] So, if you have any questions, I'm happy [29:05] to answer them. [29:15] I mean this distinction between smaller [29:17] trees and and you referred to them as [29:20] grand trees or we've talked about [29:21] significant trees. Can you talk a little [29:24] bit about the [29:26] smaller trees that you're taking out and [29:32] >> how big are they? just an idea versus [29:36] this [clears throat] what we call [29:37] significant trees or you refer to as the [29:38] grand trees. [29:39] >> You can see a lot of those trees right [29:40] there. We're talking about, you know, [29:42] >> I would say typically if I'm of all the [29:44] projects I've worked on Woodside and in [29:46] the greater Bay Area, the trees that [29:48] people seem to be most concerned about [29:50] are oak trees and we're trying to [29:51] preserve a lot of those oak trees. So, [29:53] we have some sycamore trees, we have [29:54] some smaller oak trees there. It's [29:56] really the bigger trees, the 24, the 36 [29:59] inch trees. We're refer to them a lot of [30:01] times as heritage trees. Those are the [30:04] grand trees that you see. We're trying [30:05] to preserve those. Those are the kind of [30:06] the what give you the grand view, but [30:09] also the the the feeling that you're [30:11] really in part of nature still. So, [30:13] we're trying to work around those and [30:15] preserve those as much as we can. So, [30:17] given the that how many trees there are [30:19] and trying to do, you know, the all the [30:22] requirements we're trying to do, you can [30:23] see that this kind of weird dash that's [30:25] in the background right there, that's [30:27] the required fire truck turnaround. Um [30:29] there's a lot of things we do that take [30:31] up a lot of room that are required. Um, [30:33] septic's a good example as well as the [30:34] firet truck turnaround. We're trying to [30:37] work within all those rules and confines [30:39] and just pure nature of the beast. We [30:42] there are definitely some of the smaller [30:44] trees that we're going to have to get [30:45] rid of. [30:46] >> And how big are they in diameter? [30:48] >> Um, well, they're they're um if they're [30:50] a 10-in tree, so we I would have to do [30:52] the calculations, but you know, you're [30:54] going you would have to go 2 pi r. So, [30:56] whatever the radius is, half the radius. [30:58] So 5 in tree 2 * 5 * pi would be you [31:02] know 30 in something like that 30 in [31:07] around for a 10-in tree. [31:08] >> Yeah. And that's the circumference. I [31:10] think he was just asking about the [31:11] diameter. I [31:11] >> was asking about [31:13] >> Oh diameter is um [31:14] >> that's what's shown on the plants. [31:15] >> Yeah, that's right there. 10inch tree is [31:16] the diameter. [31:19] >> Most of the trees that you're cutting [31:21] are less than 14 inch in diameter. [31:23] >> I'd say the majority of them. Yes. [31:25] They're they're between 10 and 14 in. We [31:28] really trying to save some of the bigger [31:29] ones. You can see that's 10. That's 13. [31:32] Um, you can go around the plants. [31:33] There's a bunch of different sheets [31:35] there that go around the plants. [31:36] Anywhere you have an X around that, [31:38] that's um, you know, smaller tree. [31:41] That's a 5-in Japanese maple right [31:42] there. So, you know, we prioritize the [31:46] bigger trees. That's always what we're [31:47] trying to do and trying to work around [31:48] those. And that's, you know, gives the [31:50] not only the grand look of the site, but [31:53] also preserves what are more of the more [31:55] significant trees to nature. You're not [31:57] cutting any trees above 20 in? [31:59] >> I don't believe so. [32:01] >> And you mentioned you mentioned a [32:03] working around other constraints. You [32:05] mentioned sewer. You mentioned can you [32:08] just highlight the other constraints and [32:09] how you've worked around them. [32:11] >> Yeah. So, um being where we are in [32:14] Woodside, we're nowhere near a sewer [32:15] system. So, we are on septic. Um septic [32:18] takes up a fair amount of room. Um [32:20] Jillian, if you want to go back to that, [32:22] there's actually at the end of the civil [32:24] plan set, there's a there's a um SUIC [32:26] plan. I can kind of show you how much [32:28] room that really takes up. There we go. [32:31] Um and you can see here there's two [32:33] different color lines. There's um the [32:34] blue lines are purple and the green [32:36] lines. And what you're required to do in [32:38] Woodside is is provide two sets of [32:40] lines. You provide primary septic system [32:42] lines and you provide expansions. You're [32:45] really only installing the primary [32:47] expansion, the primary lines. the [32:48] expansion's there in case there's ever a [32:50] problem, which I don't think I've ever [32:52] seen in my lifetime, you know, any sites [32:55] that really need that. I I wouldn't [32:57] expect in the next hundred years that [32:58] those those expansion lines would need [33:00] to be used, but nonetheless, we have to [33:03] provide for them by county code and for [33:04] health and safety reasons. Um there's a [33:07] whole bunch of places we're trying to [33:08] work. We're trying to use the natural [33:10] topography. You know, there's also a [33:12] bunch of trees that are in that area [33:13] we're maintaining and working around, [33:16] but we decided that, you know, try to [33:17] use the topography that's there. Try to [33:19] use the existing where the existing [33:21] house is now. Try to use where a lot of [33:24] the developments happened and where we [33:26] have more of a sloped area. That's where [33:27] we're putting the septic. So, once the [33:30] septic is installed, you'll never know [33:32] it's there. It's all underground. But, [33:34] we're trying to prioritize trees as well [33:36] in those septic areas so that we work [33:38] around them. [33:40] Um, some of the other constraints are [33:42] obviously the driveway. You know, fire [33:44] department has very strict requirements [33:45] as far as the how wide the driveway is, [33:48] how steep it is, and at the end of the driveway, we have to [33:52] put a fairly large fire truck turnound. [33:54] So, we're making sure that's installed [33:56] in there. So, between that and then [33:59] also, if you can go to I think it's 31, [34:03] you can go real quickly. Yeah. See up [34:06] there in the top there's this what's [34:07] called a bio retention area. This is [34:09] something that's used for storm water [34:10] quality. It's um think of it as kind of [34:13] depressed planted area. Um general way [34:16] to think about it is if you were to [34:18] accidentally open your car door, you're [34:20] a nice person, you care about the [34:21] environment, you accidentally your [34:23] Starbucks wrapper falls out. Um your car [34:25] leaks a little oil, you don't even [34:26] realize it. When it rains, that all gets [34:29] picked up. And when what we do is we [34:31] grab all that, you know, water that [34:34] might have some hydrocarbons in it or [34:36] might have some trash in it. It goes to [34:38] this this bio retention area. [34:40] Essentially, it acts as a filter. Any [34:42] major trash gets stuck at the top. [34:44] Anything that's kind of in in this in [34:46] the water goes through kind of a planted [34:49] area where the plants actually help [34:50] decompose some of that um nasty water [34:53] and stuff like that. And what goes out [34:54] is more of a clean water. That's a [34:56] requirement that's all throughout [34:58] California now. So, but you can see just [34:59] by the look of it, it takes up a fair [35:02] amount of room. So, that's also a site [35:03] consideration that we have to be careful [35:05] of. And so we looked at try to find a [35:08] area of the site that was kind of out of [35:10] the way, wasn't going to um impact [35:12] trees, wasn't going to cause a [35:14] significant grading concern. And that's [35:15] kind of how we end up where we did [35:20] » question. It's a little bit difficult in [35:22] the drawings to understand the specific [35:25] cut bill areas. [35:26] >> Can can we maybe would you be able to [35:28] take us through that? [35:30] >> Yeah. So, um, you can kind of see right [35:33] here that the the var let's go down one [35:35] page. We'll get the overall picture. [35:37] There we go. Nope. The overall There we [35:38] go. So, um, what we're doing here is [35:42] we're trying to say, you know, the [35:44] driveway comes in. We're keeping the [35:46] kind of more sloped areas that are off [35:48] to the right as you drive in or more top [35:49] of the page, top right of the page [35:51] there. Trying to keep that area natural. [35:54] Everything else in the areas that have [35:56] already been developed, those are the [35:57] areas we're trying to do grading in. So [35:59] you have things such as the roadway [36:01] itself as you come in off the off Fox [36:03] Hollow. You're having to dig down to put [36:05] a roadway base in there. So you uh you [36:07] know typical roadway, you know, you [36:10] can't just drive on the dirt. You have [36:11] to put down asphalt. You have to put on [36:13] rock underneath it. All that gets [36:15] contributed to how much grading you're [36:17] doing. We're trying to match the [36:19] existing grades as much as possible. But [36:21] even when we're matching existing [36:22] grades, we have to dig down to put the [36:25] appropriate materials. Um, as you go [36:27] around the property, you know, we've got [36:29] in the backyard there the the the law [36:31] the lawn area, which is basically taking [36:33] up the area where the old original house [36:35] was. We're going to be filling in the [36:37] foundations for that original house. [36:39] We're going to be filling that area a [36:41] little bit in so that it's a little more [36:42] level, a little more more usable area. [36:45] And then, of course, the house itself [36:46] has a basement, has a a driveway that [36:49] goes down to the bottom level. All that [36:51] is sight grading that we're using, but [36:53] we're trying to minimize that. I would [36:55] say in this case it's not so much we're [36:56] taking a huge one small area and doing a [36:59] massive amount of cut or fill or [37:01] anything like that, but we're kind of [37:02] spreading it out through most of the [37:03] site to kind of just balance things out. [37:09] » Can you maybe highlight the fill areas? [37:11] >> The what? [37:12] >> The fill areas. [37:13] are going to be kind of [37:14] over toward the left where the ADU is [37:15] and the fire truck turn around and then [37:18] also in the area in the back where the [37:20] um we have a routine wall in the back um [37:21] where the lawn is. That's along the the kind of large square back there. [37:25] Yeah, right around there. That's got a [37:27] couple feet of fill. Um, again, the [37:30] driveway itself is cutting out and we're [37:32] trying to place that fill somewhere. So, [37:33] we're trying to balance. So, we're [37:35] trying to do that kind of magical, you [37:37] know, let's take some from over here and [37:39] place it over here. So, those are the [37:41] kind of the main areas. The driveway [37:42] takes up a huge amount of it and we're [37:44] using that kind of backyard to kind of [37:46] place it still so that we can kind of, [37:48] you know, balance that out. But by [37:49] balancing it out, it also kind of makes [37:51] a usable area for the client to be able [37:52] to utilize and have what they would like [37:55] to do, you know, to have they can enjoy [37:57] their property. [37:58] >> And when you fill there, how does that [38:00] sort of look relative to the natural? [38:04] >> Well, again, that whole area is an area [38:06] that's already kind of flattened out. [38:09] So, it kind of raises and falls where [38:11] the old house was, where old landscape [38:13] was and everything like that. And we're [38:15] just kind of leveling it out. So, it's [38:16] not an area that was already very hilly [38:19] that we're cutting in or filling in or [38:21] making it so it's unnatural. We're kind [38:23] of just spreading it out and leveling [38:25] that area out a little bit. [38:30] uh with respect to the bio retention [38:32] area when all the grading is complete [38:36] and the site is developed what sort of [38:39] square footage is that retention area um [38:43] u um draining essentially [38:48] >> I don't have that number exactly in [38:49] front of me but it's several hundred [38:50] cubic yards of grading um you can [38:52] imagine that that area right there you [38:54] know I would say that area is probably [38:56] about 50 by 70 ft and What we have to do [39:00] there is we have to dig down about 5 ft [39:02] straight down and replace that that dirt [39:06] that we took out. And then what gets [39:07] replaced with is a combination of [39:10] gravel. I have like 18 inches of gravel. [39:13] Then we have what's called a bio [39:14] retention mix. It's kind of a special [39:16] soil that's just good for the [39:19] environment, good for um filtering storm [39:21] water. We have to import that soil [39:23] because it's not the soil that's on [39:24] site. the site, the soil that's on site [39:27] is fairly clayy and we're looking for [39:29] something that's kind of a combination [39:31] of mulch and sand and everything that [39:33] water can permeate through but also [39:35] plants can grow in. Um and that that's a [39:38] again that's that takes up a fair amount [39:40] of grading just that one entity that's a [39:42] requirement of the state to be able to [39:44] put that in. [39:45] >> Right. So that's included in the grading [39:46] total now. [39:47] >> Oh absolutely. [39:48] >> Okay. [39:48] >> Yeah. And then final question um the [39:52] size of that retention basin that is [39:54] sized for some nominal event is that [39:57] sized for like a 5year rainfall event or [40:00] 20 year or [40:01] >> No, it's actually a little different [40:02] than that. So um the way it works is you [40:04] are required to provide a bio retention [40:06] area that essentially 4% of the [40:09] impervious areas on site that's driveway [40:12] roof stuff like that. It's a little [40:14] different than when you're talking about [40:15] storm drainage when you're like get [40:16] these events. Bio retention, ironically, [40:19] is made for smaller rainfalls. So, we [40:21] call it the first flush. You have the [40:23] entire summer where it hasn't rained and [40:26] that's where you can get stuff on the [40:27] ground. You get gunk from your car that [40:29] might fall out. You get trash that might [40:31] fall out. You don't even realize it. [40:34] It's that very first rainfall you get of [40:35] the season that picks up the most [40:37] dirtiest water and that gets [40:39] transferred. Once the rains start, the [40:42] vast majority of the um rain is clean [40:45] because that's we've already got that [40:46] first gunk. It's usually like the first [40:48] rain, even if it is January and it's [40:50] been raining all season, it's the first [40:52] couple hours that rain that's really [40:54] picking up the most and that's what [40:55] we're trying to take with that. So, if [40:57] we get an absolutely huge storm, it'll [40:59] actually have a bypass that it goes [41:01] right beyond that. it should go through [41:03] pretty well, but when you get a really [41:04] huge storm, then it goes on to what's [41:06] called the retention system, which is [41:08] another storm drain device we have to [41:10] work on at Woodside that um basically [41:13] retains the water. So, because we're [41:15] changing the amount of impervious [41:17] surface on the site, we're not able to [41:19] let that water percolate into the ground [41:20] as much. We don't want to exasperate the [41:23] creeks. Creek creeks right down by [41:24] closest to Woodside Road. There's that's [41:26] where Bear Gold Creek is. um that's [41:29] where we're going to be basically reme [41:30] metering the storm water and releasing [41:32] it at a slower rate. So we're kind of [41:34] doing double duty and that also gets [41:36] included in that calculation. We have to [41:38] put these fairly large pipes in the [41:40] ground. That also gets calculated in [41:42] that that calculation so we can make [41:43] sure that we're accounting for that for [41:45] the amount of dirt we're moving around. [41:47] So there's a lot of requirements just [41:49] not only what the client wants to see [41:50] out there but with all the regulations [41:52] that either the town has or state of [41:55] California has imposed on the town and [41:56] we have to follow. [42:00] » Thank you. [42:01] >> You're welcome. [42:05] Got [42:12] » Hi, my name is Ken Lindstead. I'm the [42:14] architect for the project. Um, [42:15] Commissioner Gar, I think you asked [42:17] about the the um the massing and you saw [42:20] a twotory story polling that seemed [42:23] large. Um, I wanted to say that the [42:25] break up of a mass, it's something that [42:27] I've employed on other projects, is to [42:29] actually break up the building into [42:31] several component parts so you're not [42:32] looking at one massive structure. So, [42:35] the idea is to have gaps between [42:37] buildings. There is one twotory element. [42:40] Um, I always think story polls look a [42:42] little more um alarming than they will [42:44] be in in kind of built form, but the the idea was to do simple forms but [42:50] break up to several buildings. So, I [42:52] just wanted to point out that it's not [42:53] necessarily changing materials in the [42:56] facade, but to just break up the [42:58] buildings as separate masses. And then [43:00] the other point I wanted to make is that [43:03] um I think the intent around uh [43:05] Woodsides kind of like trying to limit [43:07] the grading is so that you don't reshape [43:09] a site from its natural state into [43:11] something else. And we are really doing [43:13] almost all of our grading as I've looked [43:16] at Jim's numbers in that central area. [43:18] We're filling in a big hole where the [43:20] current house is. But I think it when [43:22] it's all done it's going to be more [43:23] restorative to the original topography [43:26] before the last remodel was done. So [43:29] those are my comments. [43:39] » Thank you. [43:46] » Are there if there's any members of the [43:48] public? [43:49] >> Yes. Public comments. Um are there [43:51] anyone in the anyone in the room or on [43:53] Zoom who would like to comment on the [43:56] project? [43:58] There are no members of the public on [43:59] Zoom. [44:10] » Great. Okay. Then we will close the [44:12] public hearing and we will move to [44:13] commission discussion. [44:16] >> Would you like to [44:17] >> um [44:19] Yes. Um, I mean, based on what we've [44:22] heard tonight and with the revisions in [44:26] the draft resolution, [44:28] um, I can make the findings and have no [44:31] problem with this project. [44:36] » I'm in the same boat. [44:41] » Okay. Um, yeah, I believe I can make the [44:44] findings as well. The the one that I was [44:48] eventually concerned about was the tree [44:49] removal. It seems like that is not the [44:52] significant trees. I mean, frankly, that 42 in oak is just like that. I [44:59] mean, that's like a heritage tree. So, [45:00] if that were going, that would be [45:01] another story. Um, but I think that's [45:04] been that's been effectively balanced. [45:07] um [45:08] yeah I mean we talked through the the [45:10] design guidelines um [45:13] sort of defer to both the ASRB and the [45:16] architect on the the massing strategy be [45:19] a personal choice but at the same time [45:20] it's um you know from a making the [45:22] findings standpoint and with that want [45:25] to respect their decisions at the ASRB [45:27] level and so with that I believe I could [45:30] also make the findings for this [45:34] anyone like to any further discussion or [45:36] do we want to make a motion? [45:40] » Um, I would move that we approve the [45:43] amended res um draft resolution as [45:46] provided to us this evening by staff. [45:51] » Seconded. [45:54] » Chair Gar. [45:55] >> Yes. [45:56] >> Vice Chair Tober. [45:57] >> Yes. [45:57] >> Commissioner Weaver. [45:59] >> Yes. [46:01] Okay. Um, [46:04] the decision of a planning commission [46:07] may be appealed to the town council. Uh, [46:10] there is a 10-day calendar appeal period [46:12] and additional information will be [46:13] obtained by staff. [46:16] With that, uh, good luck with the [46:17] project and, um, thanks for your time [46:19] tonight. [46:28] » Yeah. And sorry [46:32] and s are there any I don't see any [46:34] reports on the agenda but is there [46:35] anything that you [46:36] >> No there's nothing further um we will I [46:39] just want to update the exact date um [46:43] the ADU ordinance that you all looked at [46:46] uh we will be bringing that to the town [46:49] council on [46:53] speak um [46:56] it will be on June June, [47:00] I think June 28th. Um, so I just wanted [47:03] to report that. [47:04] >> Sorry, it's going to town [47:05] >> to to town council on June 28th. [47:08] >> And that's all I have to report at this [47:10] time. And then, um, Sage, I've been out [47:13] of the loop for a while. I perhaps [47:14] missed it. Has the judge made any ruling [47:18] on the litigation surrounding the [47:20] parking lot expansion at Kinyatta [47:22] Corners or is that still being [47:24] >> There there is there was a um [47:28] a decision no Jean if you're online if [47:30] maybe [47:31] >> yes I am there was a tenative um ruling [47:34] issued and the parties are further [47:37] briefing and so there is no final ruling [47:39] yet. [47:41] >> Is thank you. Is the tenative ruling [47:43] public information? [47:45] >> The the tenative ruling indicated that [47:47] the town needed to um abandon the entire [47:52] easement as opposed to a portion of the [47:54] easement on on the back of the property. [47:58] Uh and that is what's being further [47:59] briefed at this point. [48:02] All SE I'm sorry, all squa um challenges [48:05] were rejected by the judge. [48:09] » Okay. Thank you. [48:11] >> You're welcome. [48:14] >> So, that's all I have.