[0:12] And. >> all right. [0:12] good morning everybody. I'm calling the jpa board of [0:16] directors meeting of september 10th 2026 to order I am rafael [0:20] mandel then the vice chair of the board. [0:22] the board meeting is being held in-person at san francisco city [0:26] hall. Members of the public may [0:27] attend the meeting in person watch on s.f. Cable channel [0:33] 2870 7178 or 99 depending on your provider or you can visit [0:37] s.f. Gov tv the website to stream the meeting live. [0:43] thank you s.f. Gov tv. And madam secretary please call [0:46] the roll. >> all right. [0:47] thank you. A vice chair, madam. [0:48] and I'd like to note we're going to go ahead and ask our [0:51] management assistant albert fierro to guide us through the [0:52] agenda today. That's okay with you. [0:55] all right. Thank you, secretary gonzalez. [0:58] directors before colleen roll, I would like to welcome our [1:03] newest board members duane nguyen appointed by caltrans on [1:06] august 13th, 2026 and park and cade appointed by ac [1:09] transit on september nine, 2026. [1:13] I also like to note that chair and director tollefson [1:16] and mariano are absent today and that director suite will be [1:20] serving as the acting mariana's alternate. [1:21] I would like to note that director kirschbaum is en route [1:25] and we will go ahead take presentations first as we await [1:29] director questions for quorum. >> with that director kinkaid [1:35] your kincaid present director larry larrabee present director [1:39] nguyen here me and present director sweet your three [1:46] present and vice chairman damien present and management [1:50] present and directors at. >> should I go ahead [1:58] and communicate more? Yes. [2:01] >> yes. Should I go ahead and call your [2:05] next item? Please do. [2:06] all right. And directors item three is [2:09] communications and we would like to note the process for [2:10] members of the public to take public comment. [2:13] members of the public may comment on the meeting during [2:16] public comment periods in person or remotely. [2:17] the call in line is provided as a courtesy and availability may [2:21] be disrupted due to technical difficulties or otherwise [2:24] in-person public comment will be taken first. [2:26] remote public comment will be taken after the public comment [2:30] and call in line is printed on the agenda and dialing [2:33] instructions should be scrolling at the bottom of the [2:36] screen on s.f. Gov tv and moving on to your next item [2:44] . Item four is board of directors [2:45] new and old business directors . [2:48] >> I'm not aware any none. All right I revive is executive [2:52] directors point three executive director good morning directors [2:59] and welcome new directors. We're excited to have three [3:02] members who've worked with and adjacent to this project [3:03] for many years. Director quinn now running the [3:07] district for caltrans office and has been engaged with this [3:10] project in many ways for many, many years. [3:13] director sweet, who's been on our executive working group [3:17] and working with us internally for many years. [3:18] on behalf of mayor laurie's office and director kinkaid who [3:21] has been with ac transit now for six months to the week I [3:25] believe and we had worked with in his capacity as an associate [3:29] administrator at the federal transit administration. [3:30] so excited to have your expertise and leadership on the [3:34] board and welcome you to the hottest board meeting of 2026. [3:40] okay, so happy transit month today. [3:44] september is transit month and we are joining our bay area [3:48] colleagues in celebrating all things transit this month we'll [3:51] have details on the transit center's free activities [3:52] and events but most notably invite you and members of the [3:55] public to join us for our second annual pop-up transit [3:59] art fair on september 23rd. It's a fun event in our grand [4:05] hall where we have artists in the transit space providing [4:09] their wares for for purchase in our grand hall and you'll [4:14] see some of that artwork from last year hanging in our main [4:17] office because we had a local artist depict the bus bridge as [4:21] seen from our rooftop park. So ari walsh, our facilities [4:25] director will provide more information about the upcoming [4:28] events along with a review of the transbay joint powers eight [4:31] anniversary celebration rooftop rhythms that just happened a [4:35] couple of weeks ago in august along with our partners at the [4:38] transportation security administration we held the [4:41] first full scale public safety exercise of our facility [4:42] in late august and had over 400 police public safety fire, [4:48] transit and volunteer staff working through our public [4:52] safety communications and it was a great opportunity to [4:54] train train jointly with our partners and strength test our [4:58] communications connections and preparations for a wide [5:01] range of public safety incidents. [5:02] and you'll hear a little bit more about that from our chief [5:05] of security rodney here shortly regarding the portal we're [5:09] continuing to advance technical durable work. [5:10] you'll hear me say that most meetings because that is our [5:13] our mission to move this forward and to address the [5:17] funding gap we've been working on a couple of specific things [5:21] since our last meeting. First, the state ended their [5:24] legislative season on august 31st and the last few days as [5:28] many of you I know are aware because you were engaged [5:31] in them were in intense negotiations on the future of [5:35] the cap and invest program which will populate some [5:36] funding for one of our target resources which is the transit [5:39] intercity rail capital program or rcp. [5:43] so legislators from both sides worked to address a reduction [5:46] and what we call tier three funding which included rcp as [5:50] well as transit operating and affordable housing funding [5:53] and that pot is expected to be smaller than as previously [5:58] planned though we remain cautiously optimistic for our [6:01] chances in the upcoming award decisions which we should hear [6:03] in the coming weeks for the tricep application that we [6:06] submitted in the spring for $750 million that 750 million [6:11] is is in line with previous awards for things like bart to [6:14] silicon valley caltrain electrification and there are [6:16] some comparable requests to do the same program for the high [6:20] desert corridor in l.a. Metro to our south. [6:23] the portal is the only named project in all of northern [6:27] california. So despite that lower capacity [6:31] we have shared our cash flow with cal star and the [6:32] governor's office so that we can continue working on those [6:35] durable technical work products to advance the project and have [6:39] a long term multiyear commitment so we can start [6:43] negotiating a full funding grant agreement with pall's [6:46] former colleagues at the federal transit administration [6:49] . We also helped shepherd ab 2308 [6:53] with assemblymember haney's office to extend the term of [6:57] collection of net tax increment from the former state owned [7:01] parcels that were created by the construction of phase one [7:04] of the transbay program. This will extend that from its [7:07] current expiration of 2050 through to 2075. [7:08] so we can harness some of the land values for the unbuilt [7:14] projects such as parcel f block four and others in the transbay [7:18] district and we can bond against that longer time frame [7:22] as a way of meeting our matching requirements. [7:23] >> so this is good news to us. It's good news to our partners [7:27] at fta as we continue to advance that funding gap. [7:30] the governor has until september 30th to sign that [7:33] bill and we are now starting the local implementation that [7:36] is a state authorization that we will then need to run [7:38] through our successor agency to redevelopment the office of [7:41] community investment and infrastructure as well as [7:44] our board of supervisors. So with your help we'll be [7:48] before some of your bodies in the coming months to [7:49] effectuate that at the local level we are also working to [7:55] recruit an ac transit representative on our community [7:59] advisory committee. We have an open seat and invite [8:03] all submittals from the public. >> submittals are due at the [8:04] end of the day today we've been out canvasing on the bus deck [8:11] in our park and out on social media and talking to our [8:13] colleagues so if you know of a great representative [8:16] representing riders on the ac transit system please send them [8:19] our way. We meet monthly and we do [8:20] provide them some food as they come and talk about the portal [8:24] and our future. Finally the quarterly financial [8:27] reports are in your packets and our chief financial officer [8:30] she members is available should you have any questions? [8:34] and that concludes the items under my reports and I'm happy [8:37] to turn it over to our facilities. [8:38] director and our security director unless you have any [8:42] questions on what I've just described. [8:45] colleagues, congratulations on the haynie bill. [8:50] thank you for your support. All right, let's keep going [8:53] right mr. Harris good morning vice chair mandolin and the [9:00] directors. I'm pleased to present the [9:04] security quarterly update covering the performance from [9:07] april through june of 2026. Today's presentation cut will [9:14] cover two main areas. >> first, the performance [9:17] review of our contract security operations. [9:21] and second, a strategic briefing on our recently [9:24] completed multiagency four scale exercise. [9:29] we remain firmly committed to maintaining the highest [9:32] standard of safety. >> we remain firmly committed [9:40] to maintaining the highest standard of safety public [9:43] welcome in interagency coordination for all our [9:45] patrons tenants and regional transit operators to ensure the [9:52] transition operates safely and smoothly. [9:55] our security contract management focus on three areas [9:58] and those three areas are personal turnover post staffing [10:02] and competency testing. >> turning to these three kpis [10:10] personnel turnover our contractor sets a threshold [10:14] requiring high staff retention a us achieved about 93% in this [10:18] category for post staffing. In terms of actual hours worked [10:25] versus expected scheduled hours a us achieved about 98% and for [10:32] post insight competency testing across 24 test administered [10:36] examination ins in q2 to security officers average about [10:42] 98% significantly above the mandatory 85% passing overall [10:49] contract security performance for kitty demonstrates [10:50] excellence. A contract adherence [10:53] and operational reliability security excellence is [11:01] ultimately driven by individuals dedication on the [11:02] front lines. We would like to take a moment [11:06] to recognize security professional the quarter four [11:09] key team shadab azizi. >> his commitment embodies [11:13] security standards and reflects the high caliber of customer [11:16] service facing security we strive to maintain at the [11:20] transit center moving from routine operation to [11:26] specialized emergency preparedness. [11:27] I want to brief the board on a major inter interagency [11:31] milestone recently completed at the facility by the [11:35] transportation security administration. [11:36] I still program is for intermodal security training an [11:40] exercise program is a premier federal initiative that funds [11:43] and support multi-agency readiness the surface [11:47] transportation hubs. >> some of the milestones if [11:51] you recall back in february of 2024 tgp was selected by tsa to [11:55] conduct a initial tabletop exercise evaluating strategic [11:59] emergency response workflows. >> subsequently based off that [12:02] tabletop exercise, tsa re selected the tjp back [12:07] in october of 2025 to organize and execute a full scale [12:14] exercise just two weeks ago overnight on august 26th [12:20] through august 27th. We successfully executed a full [12:21] scale exercise directly inside the transit center. [12:25] >> this exercise brought over 400 participants including [12:31] operators, operators, actors, role players, local, regional [12:33] and federal law enforcement agencies as well as regulatory [12:37] agencies doing non operational hours with no impact to the [12:40] morning schedules. The exercise was designed to [12:50] evaluate four core emergency management objectives one [12:54] multi-agency interoperability we establish a unified command [12:59] post integrating surfaces local pd, san francisco fire [13:03] department, san francisco department of emergency [13:05] management, tsa and some in our regional transit operators as [13:09] well as law enforcement. We successfully tested [13:10] and shared radio frequencies and joint tactical decision [13:14] making. Number two was the real time [13:17] operational readiness of participating first responders [13:20] responded on a realistic time pressures and simulated [13:24] stresses testing perimeter security control, ground [13:28] dispersal victim triage and emergency access pathways. [13:32] three was our emergency operations plan validation [13:36] exercise are designed to uncover friction points before [13:37] real incidents occur. We validated our physical [13:41] security emergency operations plan as well as our security [13:44] systems integration along with our public address system cctv [13:48] area tracking and etc.. >> and finally it was the last [13:55] piece was the federal regulatory compliance. [13:56] this exercise keeps gpa and puts us at the forefront [14:00] for future grant opportunities from department homeland [14:03] security as well as the federal transportation administration. [14:07] >> in conclusion, t2 has demonstrated a strong baseline [14:11] performance across all security contracts for kpis along [14:15] industry leading emergency readiness validated through our [14:18] federal tsa partners. We remain dedicated to [14:23] protecting assets, supporting our tenants partners, [14:27] safeguarding the thousands of passengers who pass through the [14:31] salesforce transit center every day. [14:32] I want to thank you, the board for your continued leadership [14:35] and support and I'm happy to answer any questions colleagues [14:44] . Yeah. [14:44] was there coordination with csp since? [14:50] was there coordination with chp ? [14:54] >> as you know there might be evacuation that yes, there was [14:56] some coordination with tsa. I mean chp they didn't play but [15:02] they just was some observers they came in observed [15:03] activities. Okay. [15:06] thank you. Yes, director, this was a [15:10] significant undertaking. As you can tell from director [15:15] harris's remarks and photos and I believe was the largest [15:18] full scale exercise of its kind that tsa has conducted [15:21] nationally since the pandemic. That is correct. [15:23] this right. Thank you for your work. [15:26] thanks for the presentation. Thank you. [15:32] director walsh. >> all right. [15:36] we have ari wash our facility director presenting the [15:39] facility operation quarter update. [15:43] >> thank you. Good morning. [15:44] vice chairman doleman and directors. [15:47] I'm ari walsh, jpa facility director. [15:51] >> happy to be here with you on this beautiful day. [15:54] let's kick it off with some fun stuff. [15:55] so statistic x. Aren't those fun? [16:00] they're fun when they go in the right direction which this [16:03] graph shows. We're just showing a pretty [16:04] significant increase last year and then some stabilization [16:10] this year still moving in the positive direction but of [16:12] course we always want to keep progressing and improving those [16:15] numbers. Some highlights from our summer [16:18] programing. So august was a very big month [16:22] for both mr. Harris and myself with his full scale exercise [16:26] and then we also hosted a three day music festival [16:30] in salesforce park which was the first one we've ever done [16:34] there. Lot of work, a lot of fun [16:37] especially when you bring in bands like tune-yards as we [16:39] can see here we had over a thousand rsvp for that show [16:44] which took place in the amphitheater here. [16:48] and then the next day keep it nice mix of music. [16:52] we had some free techno with lady starlight and adrienne [16:56] again 1000 hours vp's very successful and a lot of happy [17:02] people. Sunday we had suds francisco [17:06] funk and fermentation festival first of its kind where we [17:09] celebrated some great funk music and things that are [17:13] fermented like coffee, beer, caboolture hot sauce, sour toe [17:17] all great things from san francisco. [17:21] so again just a very great weekend with no incidents [17:24] and no issues new amenity alert we got to keep the music going [17:32] and one way to do that is to add a piano which we did in our [17:34] wetlands garden. So if you're any good or just a [17:37] beginner, check it out. We'd love to hear. [17:40] most of us would love to hear those tunes being played at [17:47] some upcoming programing preview. [17:50] so we've got the all women's montclair big band jazz coming [17:55] this saturday. So check that out at the [18:00] amphitheater and then we have a math quest coming up to help [18:03] celebrate transit month here at the transit center. [18:07] and this math quest is transit themed and is focused on a [18:11] journey across america which is pretty cool for slide eight [18:18] here. As director van de water had [18:19] mentioned, we are working with s.f. Transit riders to [18:26] celebrate the annual bay area transit month at the transit [18:29] center. And we've got two great events [18:30] planned. The first is in and be on [18:34] saturday the 19th which focuses on high speed rail and will be [18:37] held in our main plaza of the rooftop park from 2 to 5 p.m.. [18:43] >> then on wednesday the 23rd we're bringing back our second [18:47] annual pop up transit art fair bringing art vendors and our [18:51] transit partners together for one lovely afternoon. [18:54] and we invite the public to join us for this great event [18:58] which will be at our grand hall on the first floor from 3 to 6 [19:03] p.m. Where we are working with muni to bring out one of their [19:05] beautiful vintage busses and we'll have some raffle [19:08] prizes to make things extra fun. [19:11] >> and also participating in the ride contest which is a [19:16] tour of the train box in s.f. Transit riders grand prize so [19:22] you got to enter there sweepstakes there and you could [19:27] check out our beautiful train box. [19:30] these events are complemented by free activities in our park [19:34] for the week of september 22nd and we look forward to seeing [19:37] you all out there. Just some quick neighborhood [19:42] updates taking care of the neighborhood is really [19:45] important obviously. >> and the east cut they don't [19:49] cut any corners and as you can see here, they've actually [19:52] wrapped a couple electrical boxes and featuring the transit [19:56] center in park just one of the many ways that they go about [19:58] beautifying the area. Some quick economic updates for [20:04] everyone. While office vacancy is down [20:08] about 3.5%, we are still over 30% but it is going in the [20:12] right direction getting a lot of leases signed in primarily [20:19] driven by growth in the air and tech sector but also with [20:23] the tourism sector as well. So some positive news there. [20:27] and then just looked at a few metrics, some a bit of a stats [20:31] nerd if you couldn't figure that out already and just like [20:35] looking at metrics like bay area or bay bridge traffic [20:38] which is at 90% of the 2019 levels downtown bart stations [20:45] are seeing increased offloading. [20:48] so a lot of folks are getting off at downtown bart which is [20:52] great in the revitalization of downtown muni ridership is up [20:56] and rush hour freeway speeds are down 4% which is showing [21:01] more congestion which should translate in more people taking [21:05] transit which we all need. Unfortunately rents have gone [21:09] up by 14%. It's a but it is showing [21:12] economic growth. >> tenant updates so we've had [21:18] the beer bottle kiosk in the grand hall and the beer bottle [21:22] pergola work kind of on here for a while. [21:24] >> the main reason is due to the build out costs that beer [21:27] bottle was seeing. >> so to value engineer those [21:31] projects we switched to more of a furniture model which is [21:35] significantly less expensive but activates the space almost [21:39] as well especially when you add shuffleboard tables and pinball [21:45] tables and things like that. >> so making some good progress [21:49] there. And then an update on the p one [21:52] restaurant on the park level that we were looking into [21:59] creating an event space there. But we do have an active rfp [22:01] out right now for a real estate broker. [22:04] so before we build that out to an event space we want to give [22:08] them a fair shot at trying to find a long term partner to [22:12] lease the space. >> and then as always, please [22:16] be sure to check out our tenants. [22:17] >> and happy to answer any questions. [22:22] mr. Lavery. >> yep. [22:27] thanks, ari. On the art fair I mean I think [22:28] that sounds really exciting is the emphasis on having at [22:33] vendors or artists show and if it's artists how you know is [22:38] there a selection process? >> so the artists it's a little [22:41] bit of both. Artists can sell things but [22:45] they don't have to so they can sell a little trinkets and lily [22:49] madison is doing the real work on this one helping with [22:52] organizing things. >> but did you want to say [22:53] anything or do you have any other questions? [22:57] >> yeah, I guess. I mean just just to flesh out [22:59] the question is, you know, are that people are they paying for [23:03] space or are there is there an emphasis on artists showing [23:05] their work? >> hi, good morning directors [23:08] lily work communications and legislative affairs [23:11] director thank you for the question. [23:12] I. >> director library they we [23:15] invited members vendors that participated last year and we [23:19] did also a call out we actually did a partnership with art span [23:25] which was a dual post on social media and they also sent it out [23:30] through e-newsletter and then we're also recruiting as others [23:34] are interested as we have space there's no cost to participate. [23:38] >> we aren't charging them. We are requiring them to [23:42] provide a license agreement just to be on site with a [23:43] certificate of insurance as needed. [23:46] >> and then also we are asking them to sell their merchandise [23:50] as well as bart and muni will also be selling and then [23:54] transit partners will be providing information. [23:57] >> yeah great. And I think it's great that [23:59] we're reaching out and interacting with different [24:02] populations in that right and the artist community will [24:05] yeah and we were keen on the fact that you called out art [24:09] span last year and wanted to ensure that we have that open [24:12] line of communication with them so they'll be there. [24:13] thank you. >> great, thank you. [24:19] all right. Thank you. [24:19] thank you. >> it's truly a fun event. [24:23] you'll see soft goods, painted goods, prints, other things [24:26] that celebrate the transit network. [24:30] so there will be probably some ac transit muni bart taipei [24:34] other representation amongst the art so it's a nice merging [24:37] of the art and transit worlds. >> all right. [24:41] let's go on to our next item that will be we'll be checking [24:46] for a public comment checking public comment in the room [24:49] don't seen check in for public comment online. [24:57] I don't see an item that we can move on to the next art [25:00] directors. Item six is the cac update [25:04] and the cac chair brian larkin will address you on this item. [25:11] >> well good morning board members vice chairman adelman [25:15] board members both new and old . [25:19] I'm here to report I'm the chair of your citizens lives [25:20] committee. I'm here to report on our [25:23] meeting of this past tuesday, september 8th. [25:25] our agenda included a monthly staff report, quarterly updates [25:29] on security and facility operations and finally on the [25:33] portal will emerge as well from whom you've just heard they [25:37] gave the staff report. Martin munoz asked if the [25:41] governor was likely to sign matt haney's bill ab 2308 which [25:45] was to extend a period of collection from other tax [25:49] revenue bonds from 2015 to 2075. [25:52] rodney harris gave a security update all as well on that [25:56] front joslyn tom thompson asks the reason for the full scale [26:01] april exercise oh and the committee wished well should [26:07] office who was their quarterly employee or officer of the most [26:13] recent one who is now going to work for as a san francisco [26:15] police officer out of the frying pan and into the fire, [26:21] ari walsh gave his update on facility operations. [26:26] paul met paul bendix asked if there has been more tourism at [26:30] the portal, henry camilla was asked a question that was much [26:34] more relevant to the high speed rail project than to the portal [26:41] but he got an answer just the same. [26:42] henry also asked if the portal could be used to host more [26:45] major events alfonso rodriguez and gave the portal update eric [26:52] shot meyer asked about the completion of the portal they [26:55] how about the competition part made the competition the portal [27:00] faces for state funding rokita hartley asked that detailed [27:03] question on the earn earn value management update that alfonzo [27:07] had provided. Eric was were more detail on [27:11] the schedule of the acquisition of right away and finally [27:14] regarding memorandum of understanding is among the [27:19] agency partners in the t.j. Pay I asked if there has been a [27:24] discussion of the cost level which though the approval would [27:27] be required for change orders for instance both for design [27:31] contractors and for construction contractors. [27:35] I work for a board for about a dozen years and our process for [27:42] addressing our board was staff time intensive often to no [27:47] positive effect that I could see. [27:50] so I'm just I would like to see that the level if not low is [27:54] appropriate for the business that they're trying to conduct [28:01] . That's it from our september [28:02] meeting. >> thank you mr. Rector's. [28:08] all right. I'll see you on october. [28:11] all right. I'll be checking for public [28:12] comment in the room. You don't see any. [28:16] I will be checking public comment online. [28:20] I don't see any we want to claim effect directors item [28:26] seven is public comment an opportunity for members of the [28:27] public? I may address authority on [28:29] matters that are within the authority's jurisdiction [28:32] and are not in today's calendar the target for public comment [28:41] in the room don't see any checking for public online. [28:45] we do have a caller. >> callers that your name [28:54] morning good morning directors this is all to bryan some of [29:00] the apologize for any background noise I'd like to [29:02] briefly speak to the proposal addressed to the mkc [29:07] and tactics committee two weeks ago which is a [29:12] $20,000,000,000.50 concession between euro and emeryville [29:17] including a new transbay tunnel only have two minutes that will [29:21] just speak to the business case for a concession model rather [29:23] than any of the elements between emeryville and gilroy. [29:27] I would like to start by reiterating that we can't carry [29:32] on with the current public sector model. [29:33] we should wait billions of dollars on consultants to drag [29:39] this project long enough to reach retirement. [29:43] this is the exact opposite of a private sector concessions on [29:47] their lowest incentivized to complete construction below [29:51] budget and ahead of schedule so that they can start operations [29:56] as soon as possible and revenues and then sorry [30:03] that the vehicle that was going behind me and then followed by [30:07] profits that was the extent of snc $38 billion proposal to [30:11] land a lee to san francisco in two hours and 40 minutes $38 [30:17] billion back in 2000 then might have ever all to go away but [30:22] also to break it up they did you know what they did? [30:25] they went to morocco. They delivered morocco high [30:29] speed rail 200 miles. Those stations got $2 billion. [30:34] seven years later they're probably going to come back [30:40] bidding for this concession. Please don't tell them to go [30:41] away again. >> thank you. [30:44] thank you. >> okay, that concludes public [30:55] comment. And next I think I have 13 [30:58] under that item where and I'm I apologize for what tag teaming [31:03] here director kirschbaum is still slightly delayed so we're [31:06] going to go ahead and jump to the next presentation item so [31:09] we can wait for her as we need to for the action items with [31:11] that will you please call item 13? [31:13] >> yes, item 13 directors 1813 is the airport update [31:19] and monthly status reports for july and august 2026. [31:22] afonso the product director sorry alfonso rodriguez the [31:26] port project director will present item I have a queued up [31:30] on the computer. Good morning vice chairman [31:34] elman directors I have a briefer version of our update [31:38] for the portal for you this month and two contracts I [31:41] wanted to note today one is an enabling works contract that [31:44] will allow us to relocate utilities on townsend street [31:49] in advance of heavy construction along the [31:50] alignment. But first we need to hire the [31:53] designer of record the rfq for the solicitation is expected to [31:57] be released later this month. Second procurement which is our [32:01] largest scope element of the entire program which is hiring [32:05] the designer to complete design and to build the civil [32:09] and tunnel scope elements of the portal is a procurement [32:12] under in progress right now and we are using a progressive [32:16] design build approach. We expect the proposals to come [32:19] in on that scope of work by the end of this month. [32:22] other items listed here are in support of our successful [32:27] delivery of the pre-construction phase and that [32:28] is we will be turning our attention immediately to [32:31] procuring the engineer if not the engineer record excuse me [32:35] an engineering consultant that will help support us with all [32:38] the design deliverables and design reviews necessary [32:39] for the progressive design build contract. [32:42] that solicitation will begin soon as this ten your rfq is [32:46] out the door or yes. Next item is our two documents [32:53] that are pretty key and helping us advance all of our contracts [32:57] in the program. That's the change management [32:58] plan and another document that's called the change [33:01] control board charter. You might recall that in our [33:05] mou with our five agency partners we said that we would [33:08] create a change control board. The charter explains their role [33:12] and responsibilities but that the key to support such a [33:15] charter is the change management plan. [33:19] that change management plan will define roles [33:22] and responsibilities to receive process any requested changes [33:25] establish the delegations of authority to do so and the [33:30] process for which that entire workflow occurs. [33:34] speaking of workflow we're also developing a mapping of the [33:38] entire workflow which shows the process of all of the [33:42] deliverable urls not just changes but the list of [33:46] deliverables that the progressive design build [33:49] contractor is asked to submit in then explains how we receive [33:52] them, process some, review them and approve them. [34:02] it's a complicated process so mapping is important for common [34:10] understanding between the contractor and this agency [34:14] and finally something that we call open book estimating when [34:16] the progressive design build contractor joins us that first [34:21] phase is to advance design but we want to advance design with [34:24] visibility of the cost associated with that design not [34:28] just the cost but the cost of construction. [34:29] so open book estimating is the process that will ensure [34:33] visible bility of how design decisions are going to [34:36] translate into construction cost. [34:43] I mentioned in past presentations we've begun a [34:44] right away acquisition program and we've released two offers [34:48] on two parcels for appraisals are in process. [34:52] the fta is reviewing a couple of them. [34:55] we are also advancing the work that will lead us to a request [34:59] before the board of supervisors to obtain a subsurface easement [35:02] which will allow us to build the tunnel and occupy the [35:04] street that begins with a record a survey public works is [35:07] reviewing it that's almost complete. [35:11] once that's complete we'll be able to begin the legal [35:12] description for the subsurface easement. [35:17] >> risk management is something I've talked about over the [35:18] years and that is the cornerstone of our project [35:22] delivery. What I wanted to highlight to [35:24] the board is that we are taking a more active approach to risk [35:29] management in preparation for onboarding our progressive [35:32] design build contractor. That means that a risk [35:33] management plan is being updated to identify measures [35:40] that more actively manage, mitigate, report and resolve [35:44] risks and that a process is ongoing with our agency [35:45] partners will have an updated management plan for their [35:49] review. But I want to thank the county [35:52] transportation authority for their assistance in having us [35:56] shift gears to a more risk management approach and the fta [36:00] that is our constant partner in all things risk management. [36:06] lastly I want to show the months that lie ahead some of [36:11] the durable work that we are planning to do. [36:14] these are topics that I normally don't present to the [36:15] board the first is something that you heard a moment about [36:21] earlier about is the early earn value management module of our [36:25] project management information system. [36:28] what is that? It's a it's a component of our [36:32] management toolkit that allows us to measure progress on [36:36] deliverables both professional services and construction [36:39] contracts to ensure progress is matching our spend and it gives [36:43] earned value visibility on on our expenditure we are updating [36:48] both our capital and our operating funding plans at [36:51] present. That's a task that will [36:52] continue throughout the balance of this calendar year. [36:55] and then of course we're getting ready to meet the next [36:59] stage gate requirement that is will appear before this board [37:04] concurrent with your we hope requested action to award a [37:08] contract for the progressive design build contract. [37:11] there are a couple of things that the blueprint have asked [37:14] us to complete and it'll be presented to you concurrently [37:19] with the recommendation to award the contract. [37:22] that concludes my presentation high level of the portal I'm [37:25] available to answer any questions you might have. [37:29] >> colleagues, thank you for the update. [37:33] thank you. All right. [37:43] at this time we'll be checking in for public comment and I [37:47] come in in the room and don't see any public comment online [37:50] and don't send any. Move on to your next item. [37:55] please do. Or back to before. [38:04] yes. Before moving to our next item, [38:05] I would like to note that the right direction has arrived [38:09] and we have quorum. All right. [38:14] >> I think we're on item eight. All right. [38:16] item eight is consent calendar directors all matters are [38:21] considered to be routine and will be acted upon a single [38:25] vote. There will be no separate [38:26] discussion on these items unless a member of the board or [38:28] the public so request and which event of the matter shall be [38:33] removed for the consent calendar and considered as a [38:34] separate item for public comment in the room see cnn any [38:42] take for pas coming online? I don't see any directors. [38:45] I have not received any indication that a member of the [38:47] board or public wishes to have any items considered separately [38:51] and confirming there is no public comment. [38:54] your items are 8.1 approving the minutes of july 9th at 2026 [39:00] meeting 8.2 ratification of the board chair slash advisory ad [39:06] hoc committee to assess the organization to ensure a [39:10] success in continuing to do a mission of managing [39:12] and maintaining the transit center and delivering the [39:14] portal project 8.3 approving amendment to the board policy [39:19] number eight travel conference travel conference and business [39:23] expense policy. That concludes the consent [39:24] calendar. >> all right colleagues, could [39:28] I have a motion to approve consent calendar to move to [39:35] second director library has moved rector kirschbaum has [39:39] seconded with it first and second motion that there [39:43] concurred I concur I. Director cushman I kirschbaum I [39:47] do regulatory I library I go to see I i3i and vice chair [39:54] amendment I amendment I consent calendar is approved. [39:58] I ready to move to the regular calendar please do affect [40:04] directors item nine is approving the teacher pays [40:07] title six program for the training period of october 1st [40:10] 26 to september 30th 29 for the chance transbay program and you [40:14] as several procurement and contract compliance manager [40:17] will be sent in will be presenting item. [40:26] >> good morning vice chair amendment and directors. [40:31] my name is ines acevedo and I serve as epa's procurement [40:34] and contract compliance manager. [40:35] today I'll be presenting the title six program update. [40:41] so because tgp receives federal funding it must comply with [40:45] title six of the civil rights act of 1964 and related federal [40:48] nondiscrimination requirements. Title six prohibits [40:53] discrimination based on race, color or national origin [40:56] in programs or activities that receive federal financial [40:59] assistance. The epa submits its title six [41:02] program update to the fta every three years. [41:06] the update outlines how epa works to ensure [41:09] nondiscrimination in the in the public I'm sorry in the public [41:13] services it provides this plan before you covers the period [41:17] from october 1st, 2026 through september 30th 2029 a title six [41:23] program must address nine required elements [41:26] and consistent with the 2023 update elements seven and eight [41:29] do not apply to t jpa because it has no federal funding [41:33] subdisciplines and construction of the new facility took place [41:37] outside of this covered the period covered by this update. [41:43] >> the public participation plan summarizes outreach [41:47] conducted since the last title six update. [41:51] it describes how jpa currently gathers input shares [41:54] information about its programs and services and identifies [41:58] future opportunities to engage traditionally underrepresented [42:02] or under underserved underserved communities. [42:06] >> the language assistance assistance plan reviewed data [42:11] from several counties served by transit operators to identify [42:15] languages that may require support. [42:17] 19 discrete languages qualify as safe harbor languages with [42:19] chinese and spanish being the most frequently spoken [42:23] languages. Safe harbor language is one [42:26] spoken by either 1000 individuals or 5% of the [42:29] affected limited english proficient population whichever [42:33] is less. In the previous update from [42:36] 2023 we had 20 languages other than chinese and spanish [42:43] and those included bengali, polish and german which were [42:46] not listed this time around. So under title six jpa must [42:51] translate vital written documents into languages most [42:55] frequently encountered by the lep customers. [42:59] federal guidance defines vital written documents to include [43:03] consent and complaint forms intake and application forms [43:07] with important consequences. Written notices of rights [43:10] notices of denials, losses or reductions in benefits or [43:14] services and notices about free language assistance services [43:17] tgp currently provides chinese and spanish translations of the [43:22] title six public notices. The title six complaint forms [43:23] and procedures is notices of free language assistance [43:27] and public hearing notices including the board and cac [43:31] meeting notices. >> and with that I'm happy to [43:35] answer any questions you may have. [43:37] >> thank you for the presentation. [43:41] >> colleagues like we don't have any questions at this time [43:46] or tech for public comment and none in any in the room. [43:49] check in for about online. I don't see any. [43:53] no no public comment at this time. [43:58] >> thank you. Could I have a motion to [43:59] approve item nine moved by director sweets and second [44:04] seconded by director kincaid. All right. [44:09] with a first and second motion. Director kincaid I conclude I. [44:13] director kirschbaum I respond I do, I do. [44:17] larry, I larry I do. I do sweet. [44:18] I sweet I and vice chairman I mean I. [44:21] amendment I item nine is approved moving on to your next [44:24] item thank you directors item ten is authorizing the [44:31] executive director to execute amendment four to the armed [44:34] unarmed contract security service agreement with allied [44:38] university security services extending the contract term by [44:41] three months and adding. Amount not to exceed $1,389,344 [44:47] bringing to the total contract authorization of $28,614,342 to [44:54] ensure a continuous coverage for the sales for the center [44:59] while a new procurement process is complete. [45:02] and then you'll have ronnie harris chief security officer [45:06] and I need several procurement contract compliance manager [45:09] we'll be available for questions available for they're [45:13] available for questions below for questions. [45:17] >> got it. Any questions? [45:19] >> yes. Hi. [45:24] no concern I know this has been an award winning. [45:28] security approach but I know this is a very short extension. [45:32] does that really give you the runway that you need to onboard [45:36] and implement a new contract? >> yes, it does. [45:40] we have we closed the procurement closes on october [45:44] 31st which gives us enough time to come to the board [45:47] in december and to make the transition for january 2027. [45:51] >> thank you. All right. [45:59] looks like we're good. Can I have a and we did we take [46:02] public comment on this? >> all right or at this time we [46:07] take it for a public comment in the room. [46:08] I don't see any checking for public online. [46:10] I don't see any and no public comment at this time. [46:14] >> I can have a motion to approve. [46:17] motion to approve. Motion to approve from [46:21] kirschbaum is there a second second and by sweet with the [46:25] first and second motion director kincaid I can get I [46:29] direct your kirschbaum by push from I dr. Library I. [46:32] library I dr. Sweet high street I and vice chair amendment I I [46:37] item ten is approved moving on to your next item authorize [46:42] directors item 11 is authorizing the executive [46:47] director to execute a participant addendum to the [46:50] special master agreement with atlantic insurance services to [46:53] provide at risk management insurance consulting. [46:55] on your owner control insurance program administration claim [46:58] management lost control and related services for phase [47:03] two of the transbay program for an initial ten year term with a [47:07] compensation determined in accordance with appendix b [47:08] calculation of charges of the purchase of it and then them [47:13] cfo. As I will be presenting the [47:16] item thank you. >> good morning vice-chairman [47:20] admin and board directors the item before you is a request to [47:24] authorize executive director to execute a participating [47:28] addendum with alliance insurance services under the [47:31] source of all master agreement to provide risk management, [47:35] insurance consulting and administration for the [47:36] owner controlled insurance program. [47:39] also known as osip for the portal in consultation with the [47:43] risk management experts recommend aided by the senior [47:47] risk manager staff evaluated all possible options for risk [47:51] management for the program and determined that the owner [47:56] controlled insurance program is an appropriate insurance [47:57] structure for the construction packages of the portal that [48:01] also will provide centralized. Insurance coverage [48:04] and administration along with claim management loss control [48:08] contractor enrollment and is cost beneficial to procure the [48:14] services. The staff leveraged a source of [48:15] all cooperative agreement which was competitively procured [48:19] and and included the services required by the. [48:23] through this process the staff selected a client to perform [48:27] the service required for the portal also have insurance [48:30] and entered into negotiations a client is also t.j. Is current [48:34] insurance broker for the transit center and has [48:38] extensive knowledge of his insurance program and risk [48:42] profile providing continuity. We as we move into the [48:46] construction of the phase two through the source of all [48:51] master agreement a client also provided a discounted rate to [48:54] the tga that was very beneficial. [48:57] >> the proposed agreement has an initial term of ten years [49:01] with an administrative fee of $2.4 million based on estimated [49:08] construction cost of $4 billion. [49:09] adjustment to the fee based on the actual cost of the [49:13] construction is outlined in detail in appendix b of the [49:16] contract a staff recommends that the board authorize [49:20] executive director to execute the participating agenda with [49:25] alliance insurance services. Mike davidson from alliance is [49:29] here with me to answer any questions you may have. [49:35] thank you for the presentation. I don't see questions. [49:39] >> let's go to public comment and write a check in for a [49:41] public comment in the room. I don't see any check in for [49:44] public comment online. Don't see any there's no public [49:48] comment at this time. >> right. [49:52] could I have a motion to approve so move move by kincaid [49:55] can I have a second back in sweet with the first [50:00] and second motion director kincaid I can get I. [50:03] director kirschbaum I kirschbaum I director library [50:08] high library I director suite I read I and vice chairman I know [50:15] when item 11 is approved thank you directors I'm moving on to [50:19] your next item. Directors item item 12 is [50:23] authorizing the executive director to exceed a general [50:26] service services agreement for janitorial services with abm [50:30] industries group for the salesforce transit center for [50:34] an amount not to exceed $7,555,900 over a five year [50:41] term we have already. Walsh, our facility director to [50:44] present an item hello again vice chair mendelson [50:48] and directors. I'm mary walsh t jpa facility [50:50] director. I do not have a presentation [50:52] but I just want to provide a few highlights from the [50:54] procurement that we recently performed for janitorial [50:57] services so. Keeping it to three bullet [51:00] points number one. Service levels we enjoyed today [51:04] will remain the same and have not been reduced. [51:08] number two tj apa is reinforcing its commitment to [51:11] the city's zero waste program by employing a full time zero [51:15] waste facilitator and three we were able to secure a five year [51:20] commitment at prices lower than what we paid today thanks to a [51:23] highly competitive market which is excellent. [51:26] specifically regarding the invitation for bids, another [51:30] term for an rfp we received eight total bids, seven of [51:35] which were deemed responsive through a competitive bid [51:36] process. Also I am joined here today by [51:42] cynthia chavez from abm. If you have any questions for [51:45] me or our contractor. >> lastly I am requesting [51:49] authorization for the executive director to execute a [51:53] professional services contract with abm industry groups for an [51:54] amount not to exceed $7,555,900. [52:00] >> over a five year term happy to answer any questions I, I [52:08] don't think I see questions. >> all right. [52:12] let's go to public comment. All right. [52:13] thank you. Take it for public comment [52:16] in the room I don't see any check in for public comment [52:20] online. Don't see any no public comment [52:23] at this time. >> all right. [52:24] can I have a motion to approve a move to approve move by larry [52:30] second seconded by kirschbaum. >> all right. [52:31] with the first and second motion director kincaid by [52:34] kincaid I'd like to respond. I presume I direct your library [52:40] . All right, larry, I do. [52:41] I disagree. I mean I and vice your [52:45] amendment I. Okay. [52:45] item 12 is approved and directors if that that [52:48] concludes your agenda for today we are adjourned