1 00:00:00,000 --> 00:00:29,580 You know, the ad hoc building committee, we can be joined via the Zoom link provided on the agenda or calling in. I'm going to call a quorum. We have quorum here. So just a roll call, Kevin Vesca. Yeah. Bob Van Acedi. Yeah. Chris Lucy. Yeah. Harry Irwin. Yep. And Lee Phanquist here. Just before this, we're discussing to who will take notes. And that was Bob Van Acedi. 2 00:00:30,460 --> 00:00:32,180 offer to do that. So thank you, Bob. 3 00:00:34,020 --> 00:00:38,480 Public comment. I don't see anyone from the comment. 4 00:00:38,720 --> 00:00:40,100 Public here. Yep. 5 00:00:40,940 --> 00:00:45,200 I just wanted to, it's, I'm not sure it's a public comment, but I didn't see a select 6 00:00:45,200 --> 00:00:50,740 board laying on comment. I just wanted to give you guys a heads up that the select board 7 00:00:50,740 --> 00:00:59,840 and town manager have been putting together 2027 objectives for the town and there is going 8 00:00:59,840 --> 00:01:06,620 to be an objective Alex lesson in consultation with Jared has put together one more about 9 00:01:07,180 --> 00:01:12,060 you know where the project is and if you can just bear with me I'll just read it out loud. 10 00:01:12,320 --> 00:01:18,100 It's also going to be at the public hearing on July 28th with regards to that. 11 00:01:18,920 --> 00:01:24,140 It also has deliverables on it but it basically is the select board recognizes the active management 12 00:01:24,140 --> 00:01:28,820 of major construction projects particularly the DPW facility construction project. 13 00:01:29,840 --> 00:01:35,260 ensures the town is in the best position to create positive outcomes. Active management includes 14 00:01:35,260 --> 00:01:41,260 but is not limited to daily meetings between the DPW director and town owner projects manager, 15 00:01:41,900 --> 00:01:45,760 weekly internal meetings with town staff, pertinent updates to town hall, 16 00:01:46,280 --> 00:01:52,660 town hall employees and neighbors, and timely approval of change orders, change orders submit it 17 00:01:52,660 --> 00:01:54,700 to the town manager and select board. 18 00:01:55,500 --> 00:01:58,280 And there's a couple deliverables. 19 00:01:59,120 --> 00:02:02,400 The one, the third deliverable, which pertains to you guys 20 00:02:02,400 --> 00:02:04,340 is by December 20, 27th, 21 00:02:04,340 --> 00:02:07,700 select board will update, I'm not December 20th, 22 00:02:07,760 --> 00:02:08,760 that date's going to change. 23 00:02:08,960 --> 00:02:11,020 Shortly, the private October of select board 24 00:02:11,020 --> 00:02:14,000 will update the charge of the ad hoc building committee 25 00:02:14,000 --> 00:02:17,680 to reflect construction phase of the public facility. 26 00:02:18,140 --> 00:02:21,240 Now, what has been recommended to the board, it was just today, 27 00:02:21,240 --> 00:02:30,320 and we were at a point of voting or discussing committee charges, but the last phase of the last 28 00:02:30,320 --> 00:02:35,160 part of the charge is the description of the advisory role that you guys would have during 29 00:02:35,160 --> 00:02:42,440 the construction phase and what Alex is recommending and I look forward to receiving input. I can 30 00:02:42,440 --> 00:02:49,020 forward this to you guys separately, but under that last section ongoing oversight and reporting, 31 00:02:49,920 --> 00:02:56,060 where it currently reads, meet at least monthly to change that to quarterly and where there 32 00:02:56,060 --> 00:03:01,400 were five bullets, it would drop to four so that you would no longer have to submit regular 33 00:03:01,400 --> 00:03:07,120 progress reports to the select board and respond to request for advice or updates on specific 34 00:03:07,120 --> 00:03:14,260 project milestones. So the other ones would still be there and it would be more of an as-need 35 00:03:14,260 --> 00:03:19,800 it, you know, if issues come up through the project manager, and then they will come 36 00:03:19,800 --> 00:03:24,740 in through Jared for involvement from the committee. 37 00:03:25,120 --> 00:03:29,580 I know it's none on your agenda, so you're not talking about, but the charge isn't changing 38 00:03:29,580 --> 00:03:30,320 in the next week. 39 00:03:31,120 --> 00:03:35,420 It's certainly not only agenda for the 28th, maybe it'll be on, I think the next meeting 40 00:03:35,420 --> 00:03:36,760 is August 11th. 41 00:03:36,760 --> 00:03:45,440 So, I will forward this to Leif and he can distribute it to you, or I can send it to you guys, I know everybody is. 42 00:03:46,380 --> 00:03:49,200 But it's more just an awareness of the direction. 43 00:03:49,800 --> 00:03:53,700 And Jared, I don't know if you could talk more to it, but because it's not on the agenda. 44 00:03:53,780 --> 00:04:00,940 But I know people who are watching the objective set in meeting would have heard this today. 45 00:04:00,940 --> 00:04:02,860 So, I wanted to make sure you heard it from me. 46 00:04:03,320 --> 00:04:04,060 All right. Great. 47 00:04:06,220 --> 00:04:09,640 Well, thank you. So yeah, here you know, anybody else any public comment? 48 00:04:11,380 --> 00:04:15,220 I don't see anybody. Is there anybody else not in the room, Jared? 49 00:04:16,460 --> 00:04:19,280 Anything I'm not seeing calls. I think cool. 50 00:04:21,360 --> 00:04:23,660 Meeting minutes. I still need to do the meeting minutes from 51 00:04:23,660 --> 00:04:27,720 month ago or two month and a half ago. So I still need to get those. And I think 52 00:04:28,600 --> 00:04:32,540 one of our last meetings was that that you Chris, I think, was taking the notes. 53 00:04:35,400 --> 00:04:36,220 You're muted. 54 00:04:38,570 --> 00:04:40,190 Yeah, no, no, I completed. 55 00:04:40,870 --> 00:04:41,750 All right. 56 00:04:42,090 --> 00:04:45,330 Let's open and get that like in next month. 57 00:04:45,710 --> 00:04:46,730 We can do that. 58 00:04:49,090 --> 00:04:50,190 Can you remember updates? 59 00:04:52,150 --> 00:04:52,930 Let's go around. 60 00:04:53,110 --> 00:04:56,270 I mean, does anybody have anything updated that they really want to say? 61 00:04:56,430 --> 00:04:58,670 Anything that let's say Kevin, you got anything? 62 00:04:59,150 --> 00:04:59,590 No. 63 00:05:00,150 --> 00:05:01,010 Bob, you have a CD? 64 00:05:02,070 --> 00:05:03,110 I don't have an update. 65 00:05:03,110 --> 00:05:09,450 Great. Anyone have any questions about the FY27 budget? I'm happy to talk about it. I 66 00:05:09,450 --> 00:05:13,930 did have a question concerning the charge of the committee, which I'll wait until Jarrah's 67 00:05:13,930 --> 00:05:19,710 report comes around, I guess, in the context of maybe discussion there. But no, nothing, 68 00:05:19,810 --> 00:05:23,070 nothing, I have nothing to offer unless asked. 69 00:05:24,010 --> 00:05:26,690 Great. Here you are. You got anything? No updates. 70 00:05:27,990 --> 00:05:32,250 Chris Lucy, how about your updates? I mean, as somebody who's around the construction or 71 00:05:32,250 --> 00:05:39,190 decide and everything has all that gone with all the buildings down except the 72 00:05:39,190 --> 00:05:45,510 mechanics building and gone the salt shed is gone and crushed the other buildings 73 00:05:45,510 --> 00:05:50,470 that house the other stuff are gone so our part of the project is essentially 74 00:05:50,470 --> 00:05:55,750 taken care of now we're waiting for the contractor to come in we pulled up the 75 00:05:55,750 --> 00:05:58,490 paid, and we pulled up the concrete, everything's cleared for them to go. 76 00:06:01,230 --> 00:06:07,770 Still I was seeing this ad hoc plan that was going to be presented in better planning. 77 00:06:08,430 --> 00:06:11,930 Nothing's been presented yet, so I guess we're still going with the plan that approved 78 00:06:11,930 --> 00:06:12,650 the telemeeting. 79 00:06:14,890 --> 00:06:20,170 Nothing much changed otherwise, we're just getting less and less area to work from between 80 00:06:20,170 --> 00:06:25,670 PFAS drilling and contractor showing up and other stuff, so we're just getting cadets 81 00:06:25,670 --> 00:06:27,290 And most of us stuff is actually done in the dump. 82 00:06:28,410 --> 00:06:32,990 So we're back and forth looking forward to the card drive to show it up and start the 83 00:06:32,990 --> 00:06:33,350 project. 84 00:06:34,050 --> 00:06:34,130 Great. 85 00:06:35,430 --> 00:06:41,930 So maybe I'm just, am I just out of the loop or just, like, what do you mean by the plan? 86 00:06:42,530 --> 00:06:43,210 What ad hoc plan? 87 00:06:44,130 --> 00:06:47,730 Well, I mean, tell me, so they're going to come forward with a better and faster and quicker 88 00:06:47,730 --> 00:06:48,050 plan. 89 00:06:48,330 --> 00:06:48,470 Yeah. 90 00:06:49,130 --> 00:06:49,490 Okay. 91 00:06:50,430 --> 00:06:53,990 I assume it's not, I don't know, maybe it's still in the works. 92 00:06:54,830 --> 00:06:55,070 Okay. 93 00:06:55,070 --> 00:06:59,210 Yeah, I will point out though. I will point out today's independent. There was a nice letter in there 94 00:06:59,890 --> 00:07:00,290 um 95 00:07:01,330 --> 00:07:05,830 And leaf you will mention in the article and stuff as far as clarifying things and 96 00:07:06,670 --> 00:07:09,490 Information that was coming out wrong from other parties 97 00:07:10,130 --> 00:07:16,690 So if you want to look that up. That's fun. Cool. Oh awesome. So yeah, all right. I was like did I just miss something completely 98 00:07:16,690 --> 00:07:22,550 Yeah, this is one right over my head, but no yeah, of course. No, of course. There's no other plan 99 00:07:22,550 --> 00:07:38,710 Um, great. Yeah, I have, I have enough analysis. I mean, I take a drive by up there. You know, I have some projects in the area and I just go by there. Looks like a nice clean site. You guys are, hopefully the contract will be very happy that you guys are leaving it nice and ready for them. 100 00:07:39,470 --> 00:07:50,170 Um, Jared, what's your update for us? Sure, I've got an update for you. Chris covered what we've done for, for our kickoff of the projects, our responsibilities pretty much taken care of. 101 00:07:50,170 --> 00:07:56,830 we've been having bi-weekly meetings with the GC for our project as well as Redox, the PFOS 102 00:07:56,830 --> 00:08:02,790 folks all together as one group. And I do have a separate meeting with Redox just prior to that 103 00:08:03,310 --> 00:08:08,110 that group meeting same day the week bi-weekly to track the PFOS mitigation projects. 104 00:08:08,650 --> 00:08:12,230 The contracts have been executed, the schedule of values have been submitted, 105 00:08:12,930 --> 00:08:17,970 the schedule of values for Emma Connors ongoing because all the subs have to weigh in and 106 00:08:17,970 --> 00:08:22,710 update all their costs and get all of that over to M. O. Conner. So that's going to develop over time. 107 00:08:23,810 --> 00:08:29,370 All the required documents have been submitted for both and we've had an in-person site visit 108 00:08:29,370 --> 00:08:35,650 with with everybody as part of the meetings and that was last week. We met with M. O. Conner's 109 00:08:35,650 --> 00:08:41,470 site prep team from Digit and we want to be careful about when they mobilize into town because of 110 00:08:41,470 --> 00:08:46,230 the drilling and going on, how much space they have, what can they get done without mobilizing 111 00:08:46,230 --> 00:08:51,850 more than once. We want to make the best use for their time. And today we had our team meeting 112 00:08:52,310 --> 00:08:57,670 and what we've discussed is a start date for ammo Connor the week of the 14th of September 113 00:08:58,670 --> 00:09:03,550 is the earliest they can get in town. While we wait for that mobilization the 114 00:09:03,550 --> 00:09:09,190 submittals for the building will be reviewed between last week all the way through September. So what 115 00:09:09,190 --> 00:09:13,930 I mean by submittals is every piece of the building that is being part of the project will be reviewed 116 00:09:13,930 --> 00:09:21,610 by Weston and Samson by our OPM and then authorized purchase, essentially, for M.O. Conner. 117 00:09:21,770 --> 00:09:26,590 So once that's approved, each step, Oconric can move forward and make arrangements for purchasing. 118 00:09:27,650 --> 00:09:32,590 And that been said, permits have been submitted for the building, the main building, 119 00:09:33,690 --> 00:09:39,210 two separate permits have been submitted for the salt barn and the other fabric structure 120 00:09:39,210 --> 00:09:42,190 for cold storage in our temporary facility. 121 00:09:42,530 --> 00:09:44,030 Those two have been approved already. 122 00:09:45,550 --> 00:09:47,970 I'm sure Rich will get to the main building next week 123 00:09:47,970 --> 00:09:48,730 or the week after. 124 00:09:49,590 --> 00:09:51,970 And that's a good sign that means we're moving along 125 00:09:51,970 --> 00:09:54,990 to the seminal process for the fabric structures anyway. 126 00:09:55,730 --> 00:09:58,390 The lead time right now for those structures is anywhere 127 00:09:58,390 --> 00:10:00,090 between eight to 10 weeks. 128 00:10:01,950 --> 00:10:03,650 We'll have a bigger discussion. 129 00:10:04,090 --> 00:10:06,470 Next Thursday we have a special meeting just for the Connor 130 00:10:06,470 --> 00:10:08,130 just to talk about those two facilities. 131 00:10:09,550 --> 00:10:14,930 redox is a head of schedule which helps us. We rearranged some of their drilling schedule 132 00:10:14,930 --> 00:10:22,450 today. The excavation with the salt barn is going to go for the prepping of the cap 133 00:10:22,450 --> 00:10:27,270 is done. They're about a week ahead. Drilling does have to happen back there. It's going 134 00:10:27,270 --> 00:10:32,330 to be a big circle of drill holes around the fabric structure. They're going to start drilling 135 00:10:32,330 --> 00:10:39,790 next week in that area, and that's about 10 days to two weeks ahead of schedule for the drilling. 136 00:10:40,590 --> 00:10:45,050 Once the drilling is done, Redox is going to do the excavation for the footing. 137 00:10:46,390 --> 00:10:51,350 And once that's done, they're out of that corner, and M.O. Conner can start making some arrangements 138 00:10:52,050 --> 00:10:56,930 to come in maybe earlier. We'll see how it goes. If that's a good thing, they're ahead of schedule. 139 00:10:57,810 --> 00:11:01,070 So back to M.O. Conner, we are talking about a change order already. 140 00:11:02,390 --> 00:11:12,070 What that is, and it's related to PFAS, is when you come onto a PFAS site, all loan, all 141 00:11:12,070 --> 00:11:17,970 roadway based material, all structural fill has to be tested for PFAS. 142 00:11:19,090 --> 00:11:24,610 The requirements every 5,000 yards, which is good because that's a lot, and I don't see 143 00:11:24,610 --> 00:11:29,050 a lot of material coming onto the site, except for some of the roadway material before 144 00:11:29,050 --> 00:11:35,990 Caving, Brian Massa, RLSP who's handling a lot of the management for retox is going to 145 00:11:35,990 --> 00:11:42,870 recommend sites for some of this fill and railway material can come from. They'll take samples, 146 00:11:43,290 --> 00:11:49,210 those samples will be tested by Weston and Samson and we'll take it from there and we'll get a 147 00:11:49,210 --> 00:11:55,330 cost estimate for that change order next week. We first need to calculate the cut and fill amounts 148 00:11:55,330 --> 00:11:58,110 and that'll give us an idea of the dollar amount on the testing. 149 00:11:58,510 --> 00:12:02,110 The downside to the PFAS piece is that it takes a long time to get those results 150 00:12:02,110 --> 00:12:03,410 about three weeks. 151 00:12:04,890 --> 00:12:07,810 But that's going to happen way in advance of their mobilization out here 152 00:12:07,810 --> 00:12:11,310 that's tentatively scheduled for the week of the 14th of September. 153 00:12:11,530 --> 00:12:13,730 So I think we're in good shape to get started. 154 00:12:14,110 --> 00:12:19,110 If we have an opportunity to get equipment and material out here for ammo corner ahead of time, 155 00:12:19,730 --> 00:12:21,790 we're open to that, we talked about that today. 156 00:12:21,790 --> 00:12:27,750 So just like doing the submittals in advance, if we can get material out here at a time that's good too. 157 00:12:28,950 --> 00:12:32,030 The notice to proceed for MO Conor has not been signed yet. 158 00:12:32,970 --> 00:12:34,930 I'm going to send it out to them tomorrow. 159 00:12:35,950 --> 00:12:41,910 Copy our OPM and Western and Samson with the date of the 15th, Tuesday the 15th of September. 160 00:12:42,630 --> 00:12:46,410 And from that, they should be generating a schedule for the entire project. 161 00:12:46,850 --> 00:12:49,610 Once that's done, I'll get that posted for everybody to see. 162 00:12:50,470 --> 00:12:59,650 Right now, the schedule for the PFAS mitigation is posted on the projects page for the town. 163 00:12:59,830 --> 00:13:03,470 And along that page, there's a couple other schedules posted there, too, with projects. 164 00:13:04,010 --> 00:13:06,990 So anybody can check in anytime and see where we're at. 165 00:13:07,670 --> 00:13:11,310 And it'll have a date on it as the last update to the schedule. 166 00:13:11,850 --> 00:13:13,370 So on that, printout. 167 00:13:13,370 --> 00:13:20,830 So what Sue was referring to a little earlier in talking to Alex, we want to make sure that 168 00:13:20,830 --> 00:13:23,850 we carry this goal and objective out until the building is completed. 169 00:13:24,930 --> 00:13:30,630 And we want to make sure the language in your charge coincides with what we're doing today 170 00:13:30,630 --> 00:13:31,610 and not just outreach. 171 00:13:33,450 --> 00:13:39,110 And we want to make sure what we have our meetings, your involvement in what we're doing moving 172 00:13:39,110 --> 00:13:44,730 forward, this is effective. And that's kind of where we started our conversation yesterday, 173 00:13:45,110 --> 00:13:51,330 me and Alex, and he brought that to the select board. That's my update. I'm going to try to limit 174 00:13:51,330 --> 00:13:58,070 the appearances from the consultants to save money out of soft cost and contingency costs. 175 00:13:58,690 --> 00:14:04,830 So you'll be seeing a lot of me. There is one other change order, no cost change order, we're considering. 176 00:14:06,130 --> 00:14:12,110 Jeff Alberty brought another idea to us that since we hadn't opted into that 177 00:14:12,110 --> 00:14:19,530 alternative, the alternate one, if there's no cost to changing the design of the 178 00:14:19,530 --> 00:14:26,390 garage bay to make it longer rather than more square as it is now, that would 179 00:14:26,390 --> 00:14:32,810 accommodate four more parking spaces for vehicles if it's longer, if there's no 180 00:14:32,810 --> 00:14:38,610 increase in square footage and there isn't. So they're reviewing that right now with 181 00:14:38,610 --> 00:14:43,170 Emma Conner to make sure there's no increase in cost to construction and there's not 182 00:14:43,170 --> 00:14:48,450 going to be any cost increase to any of the design fees. So if they make the garage a 183 00:14:48,450 --> 00:14:54,570 little longer than wider, same square footage will gain some storage space by having larger 184 00:14:54,570 --> 00:14:57,930 vehicles on one side, smaller vehicles on the other. 185 00:14:58,610 --> 00:14:59,970 or leans at . . . 186 00:15:01,300 --> 00:15:19,700 I did talk to Rich a couple of days ago, Rich Waldo, the director there, and that was his understanding when he went into work for Orleans on what they had done for their garage. Large vehicles on one side, smaller vehicles on the other. So we'll find out, hopefully next week, this is a no-cost change order for everybody. 187 00:15:22,790 --> 00:15:32,350 That's my update. Thanks, sir. Anyone got any questions for Jared? So I have a question regarding charge. So a couple of things. 188 00:15:32,350 --> 00:15:38,850 So I just kind of a comment if we were all pointed for a very specific purpose, and now 189 00:15:38,850 --> 00:15:44,950 that purpose is going to change, I think it's something we need to agree to or be, you 190 00:15:44,950 --> 00:15:47,870 know, and say I'm not sure how this jives with the select word. 191 00:15:48,150 --> 00:15:49,390 That's just my observation. 192 00:15:49,390 --> 00:15:58,930 And then my question, though, in terms of what was said about what we're expected to do, I wonder 193 00:15:58,930 --> 00:16:00,630 how efficient that is for the town. 194 00:16:00,630 --> 00:16:15,950 So Jared, if you're going to be making reports on an ongoing basis, the Kelly who's going to be reporting through the town manager reports that select board meetings to the select board, I don't understand what functionally this committee is expected to perform. 195 00:16:16,710 --> 00:16:21,930 What's the value add and what's the use of our time other than what seems like a layer of bureaucracy? 196 00:16:21,930 --> 00:16:29,070 see it. That's what we I discussed with Alex. What can we do to make you you all effective 197 00:16:29,070 --> 00:16:36,030 in the project and we talked about myself giving updates once a month or maybe every every 198 00:16:36,030 --> 00:16:39,790 third select board meeting depending on how the progress is with the project that sort 199 00:16:39,790 --> 00:16:46,250 of thing but where do you guys fit in and all of that? Yeah and if if I can just add on to that 200 00:16:46,250 --> 00:17:01,110 So, when we revised the charge, I think it was last year, at this time, that last piece of it was really about the post-town, like everything else before that was getting us to town meeting. 201 00:17:01,770 --> 00:17:10,990 And then the last action was, it was really focused on being available, you know, you guys are the experts for the construction phase. 202 00:17:10,990 --> 00:17:17,730 And so, you know, like here we're already getting change orders, you know, vetting that through 203 00:17:17,730 --> 00:17:27,090 you guys is important. But I think in terms of town resource and your time there was discussion 204 00:17:27,090 --> 00:17:33,250 about the frequency of means. I mean, the charge now, I mean, the only changes that were being recommended 205 00:17:33,250 --> 00:17:39,790 to the charge were about, you know, the reporting back to the select board, like you guys were doing at once a month 206 00:17:40,250 --> 00:17:46,430 for good reason. And you were meeting at least monthly, but it was actually every two weeks. 207 00:17:47,190 --> 00:17:52,530 So with Alex and Jared were proposing is to change that to quarterly or as needed. 208 00:17:53,590 --> 00:17:59,190 Because you wouldn't want to, if there's a change order coming in and the OPM needs your input, 209 00:17:59,190 --> 00:18:03,470 you wouldn't want to sit there and have to wait until you were, you know, that you guys were meeting. 210 00:18:04,010 --> 00:18:07,570 So it would have to be on and as needed. So that was, that's what was being proposed. 211 00:18:07,570 --> 00:18:12,050 was the slackboard we really didn't get into much discussion about it, but it was more 212 00:18:12,050 --> 00:18:15,970 about your time and town resources to have these meanings. 213 00:18:16,950 --> 00:18:18,270 Yeah, I guess what I appreciate that. 214 00:18:18,350 --> 00:18:22,270 I'm trying to clarify, I guess, is so we don't have a quarterly meeting schedule, for example, 215 00:18:22,930 --> 00:18:29,070 but we're just going to basically be reported to and not really input because as you point out, 216 00:18:29,070 --> 00:18:31,230 I mean, a change where it comes, it's got to be addressed. 217 00:18:31,530 --> 00:18:33,890 It can't wait a quarter to be addressed, right? 218 00:18:33,890 --> 00:18:39,790 So yeah, for the most part, that decision is going to be made by Jared Kelly and the slide 219 00:18:39,790 --> 00:18:40,310 court, right? 220 00:18:40,510 --> 00:18:45,030 I mean, yes, yeah, and I appreciate, you know, people here, you know, not me, certainly, 221 00:18:45,330 --> 00:18:51,710 but, you know, Leif and Kevin and other people, Chris, that are far more, you know, boots 222 00:18:51,710 --> 00:18:57,050 on the ground for construction projects than I am for that at that level, you know, giving 223 00:18:57,050 --> 00:18:57,370 input. 224 00:18:57,510 --> 00:19:01,330 I'm just trying to kind of get in my head straight, okay, for a meeting, well, you know, if 225 00:19:01,330 --> 00:19:06,930 have a meeting schedule of every quarter, you know, is it just redundant information that we're 226 00:19:06,930 --> 00:19:12,170 getting because in that cadence, we're not really going to have an opportunity to make any kind of an 227 00:19:12,170 --> 00:19:16,230 impact. This stuff's going to have to happen in the, you know, relatively quickly to keep the project 228 00:19:16,230 --> 00:19:22,330 moving. And is there something else we can do, whether you would like us to do, to contribute? 229 00:19:23,110 --> 00:19:26,750 That's sort of kind of my head is still. I guess that has to be figured out. 230 00:19:26,750 --> 00:19:36,070 But the building committees input into that and the change of the charge will be important. 231 00:19:36,410 --> 00:19:39,710 It's not like someone's coming in and just saying, here's what you guys have to do, Nail. 232 00:19:41,990 --> 00:19:47,410 Even when we revise the charge, we try to revise it so that we could efficiently move forward. 233 00:19:48,010 --> 00:19:54,030 But the fourth piece of that was that you're going to be, it was a two-year reassignment 234 00:19:54,650 --> 00:20:02,990 So that you can be a part of the construction, you know, because like you don't know what's coming or you know, I don't want to jinx it by saying it's going to be smooth. 235 00:20:03,770 --> 00:20:11,490 But Jared, you know, maybe you can talk more to what your expectation is as staff. 236 00:20:11,490 --> 00:20:20,530 So, if something good does come up like a significant change order like the redesign of the garage bay, it wouldn't be a quarterly meeting. 237 00:20:20,690 --> 00:20:26,770 Well, I explained it to Alex. If that comes up, then we're going to want to call a meeting while we mull over the design and cost. 238 00:20:27,690 --> 00:20:34,230 If it's a change order that needs immediate action in a sign off from Kelly, I'm not going to have enough time to get that to you. 239 00:20:35,130 --> 00:20:37,530 And that's going to have to happen right away. 240 00:20:37,650 --> 00:20:40,330 Anything under $100,000 change order amount, 241 00:20:40,510 --> 00:20:43,230 you can sign right away with something like a change 242 00:20:43,230 --> 00:20:45,650 in design that can take a week to 10 days. 243 00:20:46,370 --> 00:20:48,150 That you can, we can schedule a meeting for 244 00:20:48,150 --> 00:20:49,770 and discuss and hash it out. 245 00:20:49,930 --> 00:20:52,950 And then something like for the PFAS potentially 246 00:20:52,950 --> 00:20:56,110 that change order there, that's a DEP requirement. 247 00:20:57,670 --> 00:21:00,250 And I can bring it to your attention when we meet. 248 00:21:01,270 --> 00:21:03,930 And some of the other change orders that may happen may 249 00:21:03,930 --> 00:21:08,750 need immediate action, I won't be able to get to you for get get get to a meeting that we'll have to 250 00:21:08,750 --> 00:21:14,450 prove right away. You know you see computers and consultants know that anything over a hundred 251 00:21:14,450 --> 00:21:19,570 thousand dollars will meet select board approval so that has to come into play they they're aware 252 00:21:19,570 --> 00:21:24,330 all that when we start getting into the project if something does come up that magnitude of price. 253 00:21:25,070 --> 00:21:30,210 Yeah so so what so where I mean look where I think I can add value without you know kind of crossing 254 00:21:30,210 --> 00:21:34,510 lines a little bit because I don't want to step on, you know, Fincos toes. But, you know, 255 00:21:35,290 --> 00:21:40,490 budget, are we on budget, you know, on a quarter or a quarter? Now, yeah, I can do that. We 256 00:21:40,490 --> 00:21:48,010 talked about that with Chris. And we're trying to each pot of money here separately. The, yeah, 257 00:21:48,250 --> 00:21:53,090 in some way, on the monies. Yeah, but even that becomes, even that becomes sort of theta 258 00:21:53,090 --> 00:21:58,610 complete, right? Because if the viz are locked, then you really, we never really should be off budget 259 00:21:58,610 --> 00:21:59,790 it except for change orders. 260 00:22:00,610 --> 00:22:02,870 So this is where I get kind of great with FinCon 261 00:22:02,870 --> 00:22:07,110 and I don't want to overstep is, okay, what about, 262 00:22:07,870 --> 00:22:12,490 is this project causing issues elsewhere in the budget, right? 263 00:22:12,990 --> 00:22:14,530 Over time, you know, it's pretty much way out 264 00:22:14,530 --> 00:22:15,890 about efficiency of operations, 265 00:22:16,550 --> 00:22:18,650 over time because people have to do this 266 00:22:18,650 --> 00:22:19,590 and they can't get that 267 00:22:19,590 --> 00:22:22,190 and they're using double using a piece of equipment 268 00:22:22,190 --> 00:22:24,610 because one is in a bit like those kind of things. 269 00:22:24,850 --> 00:22:27,350 That's more of a, that's a question I would ask 270 00:22:27,350 --> 00:22:33,550 if I was on FinCon, you know, sort of big picture on an ongoing basis. I don't know necessarily 271 00:22:33,550 --> 00:22:35,850 if that's appropriate for me to ask here. 272 00:22:38,130 --> 00:22:40,410 So I guess we can figure out this out. I would 273 00:22:40,410 --> 00:22:45,650 be curious to hear what other members of the committee feel like they would want to add to an 274 00:22:45,650 --> 00:22:53,350 ongoing process of observation or what's the word I'm looking for. You know, overseeing. 275 00:22:53,950 --> 00:22:56,510 Yeah, yeah, it's 276 00:22:58,560 --> 00:23:02,400 anyone else have any response to that because I mean, I mean, personally, 277 00:23:02,440 --> 00:23:06,180 I mean, I just think like, you know, like in P down, we, you know, they continued on 278 00:23:06,980 --> 00:23:12,660 with the project as a means of sort of the civic oversight and they did deal with change orders 279 00:23:12,660 --> 00:23:18,040 and everything like that. And it was more like, hey, like, you know, this, this was a project 280 00:23:18,040 --> 00:23:24,360 that was pushed for 10 years and we are going to continue on with it, right? And it kept sort of like 281 00:23:24,360 --> 00:23:30,860 that same tone throughout that there's people there that this wasn't just like, 282 00:23:30,940 --> 00:23:37,420 hey, we were part of the town necessarily and meaning like we weren't just like, 283 00:23:37,540 --> 00:23:41,800 hey, like trying to get a project for the employees or like whatever of the 284 00:23:41,800 --> 00:23:45,580 town or just like we're working for the town. We were, you know, a separate entity 285 00:23:45,580 --> 00:23:52,980 from it, right? So that that always find is a super helpful thing to continue. 286 00:23:54,140 --> 00:24:06,760 Because, you know, the Slack board and you guys as employees are going to deal with like the public's being like, well, now we have change orders. Where is that civic oversight to sort of deal with all this and why isn't there? 287 00:24:06,960 --> 00:24:17,900 Like, you know, they're just going to get like the accusations of like transparency and stuff. So that like even just being able to have this meeting out there in the public that there are change orders that are already happening is a good thing. 288 00:24:18,980 --> 00:24:25,900 But to Bob's point, how can we even affect any of those change orders if they need to happen so quickly? 289 00:24:26,680 --> 00:24:31,260 At a quarterly meeting, we essentially are just, we're not doing anything. 290 00:24:33,300 --> 00:24:36,740 So, but yeah, how do you find the in-between for all of that? 291 00:24:37,640 --> 00:24:42,560 I don't know, and it's really about how the select board and everybody wants to deal with that. 292 00:24:42,560 --> 00:24:46,600 But if the select board just wants to now take that on and just, you know, we get dissolved 293 00:24:46,600 --> 00:24:51,340 and essentially, you know, anything that really happens, the select board needs to make 294 00:24:51,340 --> 00:24:57,320 sure that they're extremely clear about how all of those changes are happening and everything. 295 00:24:57,800 --> 00:25:00,520 So I don't know how is it, yeah, Kevin. 296 00:25:02,780 --> 00:25:11,120 I just have, like today I went and donated some food at the community center and, you know, 297 00:25:11,120 --> 00:25:18,560 our model is still there. So part of what we did what? Part of what we did was 298 00:25:18,560 --> 00:25:24,080 communication and I was thinking that at that model we could take that little 299 00:25:24,080 --> 00:25:30,340 plastic stand we had and just say for updates and and give people a location to 300 00:25:30,340 --> 00:25:31,820 look for updates. 301 00:25:34,600 --> 00:25:44,360 You know, I'm not sure that we are going to have that much input. I think 302 00:25:44,360 --> 00:25:52,620 that we have a really good professional team. But the fact that there are the six of us that 303 00:25:52,620 --> 00:25:58,040 people know we were on the ad hoc committee, they may ask us questions. And if we meet quarterly, 304 00:25:58,040 --> 00:26:05,640 we can give our friends and neighbors updates and maybe put something on our web page. 305 00:26:07,200 --> 00:26:10,600 If we continue, that's just my thought. 306 00:26:11,360 --> 00:26:11,760 Thanks. 307 00:26:18,350 --> 00:26:26,230 Julie, I just want to remind everybody that what is being recommended is not changing the 308 00:26:26,230 --> 00:26:26,970 charge per se. 309 00:26:26,970 --> 00:26:34,850 That last bucket is that advisory role during the construction phase, and as written, it's 310 00:26:34,850 --> 00:26:39,390 maintaining regular communication with town manager and or DPW director to stay informed 311 00:26:39,390 --> 00:26:44,950 on the progress and emerging issues, which if the decision is to go quarterly, that would 312 00:26:44,950 --> 00:26:45,330 happen. 313 00:26:46,150 --> 00:26:52,110 Second, bold is to ensure that the final construction aligns with the town's energy and sustainability 314 00:26:52,110 --> 00:26:55,090 objectives as outlined in the construction phase. 315 00:26:55,830 --> 00:27:01,430 The third is to provide advice and recommendations to the select board throughout the construction process, 316 00:27:01,550 --> 00:27:08,250 especially in response to significant project milestones, change orders, issues, and cost implications, 317 00:27:08,730 --> 00:27:10,950 or decisions requiring the talent input. 318 00:27:11,150 --> 00:27:13,410 So that I think it's still there. 319 00:27:13,730 --> 00:27:18,690 I think what you guys are saying, because things need to be timely, you know, even if you 320 00:27:18,690 --> 00:27:24,810 were meeting monthly or the OPM comes to gyrants as we need to decision, you know, the same 321 00:27:24,810 --> 00:27:28,030 anything would happen with the select board if it was over a hundred K, we might have 322 00:27:28,030 --> 00:27:31,090 to have a special meeting, you know, to address it. 323 00:27:31,190 --> 00:27:36,550 But I don't think anybody's taking that – the thought isn't about dissolving because 324 00:27:36,550 --> 00:27:39,490 I think to have the oversight, this is a big project for the tail. 325 00:27:40,330 --> 00:27:47,730 And the engagement of this committee as not only with the consultants and the select board 326 00:27:47,730 --> 00:27:50,130 and other committees, but also with the community. 327 00:27:50,130 --> 00:27:55,710 And so to Kevin's point, you guys are like the talking heads. 328 00:27:55,990 --> 00:28:00,610 So if you run into someone at the food store or whatever, Jared's going to be updating 329 00:28:01,210 --> 00:28:02,170 the website. 330 00:28:02,170 --> 00:28:05,150 It's still an active website with project updates. 331 00:28:05,350 --> 00:28:06,270 So you're going to have that. 332 00:28:06,590 --> 00:28:12,390 So really the only question is, is a matter of, you know, getting rid of some of, you know, 333 00:28:12,430 --> 00:28:17,770 you guys were going to the Slack forum presenting updates and updates and updates because we 334 00:28:17,770 --> 00:28:24,290 everyone wanted to be engaged in it and it was important to keep that messaging out there. 335 00:28:25,030 --> 00:28:29,410 You were meeting every two weeks, you know, maybe after discussion, you're going to keep it 336 00:28:29,410 --> 00:28:33,390 at monthly and maybe cancel if not needed. This was more written quarterly, 337 00:28:34,010 --> 00:28:39,070 or more frequently as deemed necessary by the OPM town staff and committee members. 338 00:28:40,130 --> 00:28:46,450 So, you know, that's more of a CBD, but that last role I think is extremely important, 339 00:28:46,450 --> 00:28:54,270 the advisory role. And that's why Alex and Kelly won it. This is an objective, a town objective 340 00:28:54,270 --> 00:29:00,970 for this year coming up. I hope that helped. Thanks, Sue. You had your panel next. 341 00:29:01,130 --> 00:29:05,770 Yeah, I just said a quick comment, I think, to maybe tie it together. So in my opinion, I think it 342 00:29:05,770 --> 00:29:11,350 doesn't make sense to me quarterly. And then as Gary pointed out, and Sue, I think you did as well, 343 00:29:11,970 --> 00:29:18,390 call on this committee to meet more frequently if necessary, and the way I can see it, and I 344 00:29:18,390 --> 00:29:22,970 would defer to people who have been involved in the actual execution of projects to correct me 345 00:29:22,970 --> 00:29:28,530 if I'm wrong, but at some point they may be a change order or something come up that says we have an 346 00:29:28,530 --> 00:29:35,430 A or B alternative, so what's best? They could cost the same, there could be long-term implications, 347 00:29:35,830 --> 00:29:40,450 there could be short-term implications, things like that for us to vet on a more frequent 348 00:29:40,450 --> 00:29:47,330 meeting basis as necessary. That's how that would be some of my vision of the next year, if for what it's worth. 349 00:29:49,050 --> 00:29:59,790 Yeah, for some of our larger projects we've done, those A and B alternatives usually hashed out with the engineers and you select one to go with. 350 00:30:00,270 --> 00:30:24,610 Um, that's how we worked with East Harbor, you can let create the school project we just wrapped up. It's a big discussion with the engineers and designers when we have an obstacle we got to get through on a redesign. That's going to be significant. And I see that coming to you all unless it's like a design to the building, but it's rarely going to be an option type of scenario. 351 00:30:24,610 --> 00:30:31,170 So for here, I mean, if we run into any expensive change orders, probably going to be uncovering 352 00:30:31,170 --> 00:30:31,970 something in the soil. 353 00:30:31,970 --> 00:30:37,430 We don't anticipate, which has already happened once this week with finding a barrel down 354 00:30:37,430 --> 00:30:39,930 behind my office buried, maybe 10 feet in the ground. 355 00:30:40,530 --> 00:30:41,930 We were lucky with that one. 356 00:30:42,030 --> 00:30:44,290 There was no release and the reporting required the DEP. 357 00:30:44,810 --> 00:30:46,030 We just got lucky, I think. 358 00:30:46,270 --> 00:30:51,850 So I think, you know, I think those will be the significant change orders if we do find 359 00:30:51,850 --> 00:30:52,550 anything else. 360 00:30:52,550 --> 00:30:59,370 Yeah, if I can just follow up real quick. So if so even if we're not going to be called upon to make a determined decision 361 00:30:59,810 --> 00:31:04,430 I still think you court then then whatever the meeting cadence is, you know can be determined 362 00:31:04,430 --> 00:31:09,970 But I do think it's important that we have that discussion because invariably people in the public will say hey 363 00:31:09,970 --> 00:31:15,550 Did you consider this did you consider this what about that? And I think it's it's great for us to say you know what? 364 00:31:16,190 --> 00:31:20,030 Jared is part of this report came to us and said hey, this was a change order 365 00:31:20,030 --> 00:31:23,470 this is what was considered, this was their end date, and this was a course of action, 366 00:31:23,970 --> 00:31:29,230 and then, you know, at least it's been vetted, you know, ahead of time. And for whatever political 367 00:31:30,310 --> 00:31:35,370 currency that carries, I think that's consistent with our e-tip of communication. 368 00:31:39,280 --> 00:31:46,500 Chris, if we created a delay during a change order discussion somehow over two, three days, 369 00:31:46,500 --> 00:31:54,160 that delay would be on the towns would be the responsibility of the town and the contractor 370 00:31:54,160 --> 00:32:02,340 would be requesting extra time and we wouldn't be pressing them on, you know, you're not 371 00:32:02,340 --> 00:32:06,960 going to meet your schedule requirements after that. So it's really, it's got to be pretty 372 00:32:06,960 --> 00:32:12,900 precise when we get into a situation like that. Change orders, high cost change orders, you're 373 00:32:12,900 --> 00:32:15,160 going to make pretty quick decision sometimes. 374 00:32:18,010 --> 00:32:19,150 Chris, you had your hand up. 375 00:32:20,530 --> 00:32:22,430 Yeah, I did, but it was pretty much covered. 376 00:32:22,690 --> 00:32:25,590 I just want to make sure that if there's any changes 377 00:32:26,150 --> 00:32:28,930 that are significant, at least we get to look at it 378 00:32:28,930 --> 00:32:30,590 because we're still advisory to the select board. 379 00:32:31,050 --> 00:32:32,890 So anything comes in, we're going to look at it 380 00:32:32,890 --> 00:32:34,730 and say we do recommend, we don't recommend. 381 00:32:35,610 --> 00:32:37,850 Whether it's an additional cost or not, 382 00:32:38,250 --> 00:32:40,750 maybe something gets lopped off because it can't be supplied 383 00:32:40,750 --> 00:32:42,290 or something's changed, I don't know. 384 00:32:43,650 --> 00:32:46,570 reorientation of one of the buildings, a couple of buildings or something. 385 00:32:47,190 --> 00:32:51,430 So at least be able to recommend, after discussion here, we can then recommend to the 386 00:32:51,430 --> 00:32:55,890 select, but yes, go ahead and pay for this or increase the value of the project. 387 00:32:56,270 --> 00:33:01,470 But yeah, that's all I wanted to just make sure that we're on board or included in the 388 00:33:01,470 --> 00:33:04,790 decision as we were, this whole process to get us to where we are now. 389 00:33:06,680 --> 00:33:10,480 Yeah, I agree with all of you, everything you guys are saying. 390 00:33:11,060 --> 00:33:16,400 Jared, I do have one question or more in comment like yeah, this whole idea of the redesign 391 00:33:16,400 --> 00:33:17,300 of that space. 392 00:33:17,580 --> 00:33:26,520 I really, that would be really great if you guys can get it for basically just no increase 393 00:33:26,520 --> 00:33:28,040 in cost, you know, that change order. 394 00:33:29,420 --> 00:33:34,000 I think it would be good just so it leaves a little bit more space to the gas station, you 395 00:33:34,000 --> 00:33:39,500 know, towards the gas depot there and stuff like that, a little bit more from, you know, to 396 00:33:39,500 --> 00:33:45,360 more space on the gas pumps. Yeah, yeah, I think, you know, because you know, this whole time, 397 00:33:45,360 --> 00:33:51,580 that just having to not, you know, not being able to move that, that's always sort of just, 398 00:33:51,840 --> 00:33:56,400 yeah, that would have worried me. Like, if I, if it wasn't already worrying you, it worried me a little 399 00:33:56,400 --> 00:33:59,880 bit throughout the whole process. I was like, oh, that building's still a little close, you know, 400 00:33:59,900 --> 00:34:04,020 no matter what. So that would be really nice. Jeff Albert, he did say today in the meeting, 401 00:34:04,020 --> 00:34:08,520 he has a problem delegating and he didn't want to let go of the design and he brought this, 402 00:34:08,520 --> 00:34:37,240 He brought it up today as it was his idea and it was late but it works so yeah, I mean hopefully it doesn't take too much of their time and everything to basically just, you know, create, you know, to redo that, you know, and hopefully, you know, working with a good contractor, they can sort of make sure that everything is easy and they all know each other in these meetings. 403 00:34:37,240 --> 00:34:40,920 I'm the only stranger. No, exactly. Oh, 404 00:34:43,700 --> 00:34:47,420 I'm sure they all give each other Christmas cards 405 00:34:47,420 --> 00:34:49,780 and stuff. That's a small world. 406 00:34:52,000 --> 00:34:54,120 Anybody else got any questions for Jared? 407 00:34:59,140 --> 00:34:59,880 So, I'll just 408 00:34:59,880 --> 00:35:06,520 move on. So, the next, the next, the next, the next agenda item, we did actually keep this 409 00:35:06,520 --> 00:35:12,040 like board updates. So that was there. So whatever, you know, if there was anything else you want to 410 00:35:12,040 --> 00:35:17,020 talk about soon, we did actually leave a little space for you to be able to discuss anything you want. 411 00:35:17,100 --> 00:35:21,900 Okay, no, no, that that was fine. I thought that was there for you giving an update to the 412 00:35:21,900 --> 00:35:27,080 select board to talk about that, you know, that monthly update that you were doing. So, maybe, 413 00:35:27,300 --> 00:35:35,260 maybe I said my piece, maybe we'll just keep that for, you know, whatever the monthly 414 00:35:36,560 --> 00:35:41,480 or, you know, quarterly, we'll just keep a space for you to be able to say what we want. 415 00:35:42,160 --> 00:35:42,600 Thanks. 416 00:35:43,080 --> 00:35:44,760 That's good to know as well. 417 00:35:47,020 --> 00:35:48,400 So, the next meeting date then. 418 00:35:49,260 --> 00:35:52,640 So, I guess we're both instead of saying what is the next meeting date? 419 00:35:52,720 --> 00:35:54,380 What are we going to discuss at the next meeting date? 420 00:35:54,520 --> 00:36:00,300 So, we have these potential change orders that Jared has discussed today. 421 00:36:01,760 --> 00:36:07,580 Should we just say a meeting in a month because maybe he'll have something for us that we actually have to look at? 422 00:36:10,200 --> 00:36:19,280 And since construction is not starting until September anyways, would that still work for the schedule and everything Jared? 423 00:36:19,880 --> 00:36:21,340 Yeah, what did I put on there August? 424 00:36:21,900 --> 00:36:40,920 It's August 6th, but yeah, I'll know way before August 6th about the redesign that's perfect. Yeah, these noodles are being done cutting in fills being calculated for the PFAS and if it's 5,000 yards minimum testing, I really don't think it's going to be a whole lot of money. 425 00:36:41,960 --> 00:36:44,060 Yeah, it's not a lot of material for the test. 426 00:36:44,060 --> 00:36:45,140 How much does the testing cost? 427 00:36:45,460 --> 00:36:45,700 Sorry, yeah. 428 00:36:45,880 --> 00:36:47,720 Do you know any estimate on that at all? 429 00:36:48,420 --> 00:36:53,440 I, I forget how much it depends on the lab we're going to. 430 00:36:53,660 --> 00:36:54,080 Okay. 431 00:36:54,980 --> 00:36:57,400 And Western and Samson is doing the testing. 432 00:36:58,820 --> 00:37:02,120 Brian's rates are pretty, pretty low. 433 00:37:03,240 --> 00:37:07,180 So I'm not sure where we're going to be with with Western and Samson and we didn't want 434 00:37:07,180 --> 00:37:09,580 to take it out of the hand of the designer to do the testing. 435 00:37:10,100 --> 00:37:13,980 Are they talking tens of thousands of dollars or is it less than two? 436 00:37:14,180 --> 00:37:16,640 Yeah, okay. We're talking like under ten thousand dollars. 437 00:37:16,640 --> 00:37:21,060 Yep. Oh, okay. Yeah. I mean, it's kind of the drop in the bucket. 438 00:37:21,400 --> 00:37:24,180 You know, you know, how many times we have to test? 439 00:37:24,640 --> 00:37:29,620 Yeah, but in our PFAS budget skyrocket for monitoring and testing. 440 00:37:31,420 --> 00:37:37,000 Yeah. Okay. So is everybody good for an August 6th meeting? 441 00:37:39,100 --> 00:37:45,620 and leave it by May, we also technically need to re-elect officers for the fiscal year. 442 00:37:46,740 --> 00:37:47,180 27th. 443 00:37:47,180 --> 00:37:47,380 Great. 444 00:37:47,640 --> 00:37:47,860 Thank you. 445 00:37:48,080 --> 00:37:49,060 We'll put that on the agenda. 446 00:37:49,300 --> 00:37:52,140 Yeah, we'll put that on the agenda. 447 00:37:52,620 --> 00:37:56,600 And we'll put an agenda item to just, if Sue, if you can, or Sue and Jared, 448 00:37:56,780 --> 00:38:03,400 if you guys just get us whatever else about the redoing the charge, 449 00:38:03,400 --> 00:38:32,300 We'll just we can just make an internal decision with the committee that just says yes, we're we're we're good because I it sounds like we're all in the same page anyways. Yeah, I don't see this being discussed at the select board in July and then the next meetings August 11 so I'll use the 11th is a possible point so that you guys meeting on the 6th. I'll have a draft you can put it on the agenda so you can provide input into the draft charge. 450 00:38:32,300 --> 00:38:36,860 But at least you've heard, like, you know, concerns or whatever, like I said, it sounds 451 00:38:36,860 --> 00:38:41,000 like we're all on the same page anyways, so that that should be pretty easy. 452 00:38:41,320 --> 00:38:45,820 I just want to be able to just say, you know, for us, I'll just agree, maybe even take 453 00:38:45,820 --> 00:38:46,060 a vote. 454 00:38:46,160 --> 00:38:46,740 Just say cool. 455 00:38:46,940 --> 00:38:47,780 Does that work moving forward? 456 00:38:48,040 --> 00:38:51,780 And, you know, we'll leave it up to you guys to change the charge, how, hey, you know, 457 00:38:51,880 --> 00:38:52,340 how you see fit. 458 00:38:52,840 --> 00:38:53,260 Sounds good. 459 00:38:53,780 --> 00:38:54,140 All right. 460 00:38:56,190 --> 00:38:56,470 Cool. 461 00:38:57,130 --> 00:38:58,450 Would you like a motion to a jar? 462 00:38:58,730 --> 00:38:59,970 I was just about to ask that. 463 00:39:00,030 --> 00:39:00,310 Thank you. 464 00:39:00,310 --> 00:39:00,650 Thank you. 465 00:39:01,030 --> 00:39:03,250 So, second. 466 00:39:04,090 --> 00:39:04,810 Second. 467 00:39:05,470 --> 00:39:07,490 Cool, roll call, Chris Lucy. 468 00:39:08,370 --> 00:39:08,810 Aye. 469 00:39:09,570 --> 00:39:11,370 Lee Fampus, aye. Kevin Bessica. 470 00:39:11,730 --> 00:39:11,990 Aye. 471 00:39:12,570 --> 00:39:13,650 Robert Pannasey. 472 00:39:13,750 --> 00:39:13,970 Aye. 473 00:39:14,670 --> 00:39:15,210 Gary Erwin. 474 00:39:15,590 --> 00:39:15,910 Aye. 475 00:39:16,450 --> 00:39:17,710 Great. Thanks, guys. 476 00:39:18,290 --> 00:39:19,130 Have a great day. 477 00:39:19,130 --> 00:39:21,950 Have a great day. 478 00:39:22,110 --> 00:39:22,310 Thanks.