1 00:00:05,440 --> 00:00:12,400 All right, good evening everyone. Thank you so much for being here. We really 2 00:00:09,519 --> 00:00:17,600 appreciate you spending some of your evening and your time to engage on this 3 00:00:15,120 --> 00:00:21,279 important community topic. My name is Corin Manning. I'm the 4 00:00:19,600 --> 00:00:25,519 director of the department of planning and development services for the city of 5 00:00:23,199 --> 00:00:30,560 Tucson. And I want to introduce some of the team who will be here tonight to 6 00:00:27,760 --> 00:00:33,920 present on this topic. Um, we have Carver Stru, principal planner with 7 00:00:32,559 --> 00:00:38,640 planning and development services, Nicholas Martell, our long-range 8 00:00:36,079 --> 00:00:43,440 planning section manager, Dan Bersik, planning administrator, as well as 9 00:00:40,800 --> 00:00:48,239 Tonnie Robertson, our facilitator for this evening, here to support the 10 00:00:45,440 --> 00:00:54,960 conversation and dialogue. Uh, so tonight's meeting is about regulations 11 00:00:51,200 --> 00:00:57,680 for largecale data centers. Um, this is a really important topic that's 12 00:00:56,399 --> 00:01:01,600 generated a lot of community conversation. So, we're really here to 13 00:01:00,000 --> 00:01:06,479 share information and have an opportunity for feedback and discussion 14 00:01:03,440 --> 00:01:10,880 tonight. Um, so data centers are a rapidly evolving technology. They're 15 00:01:08,320 --> 00:01:16,000 really new emerging use and our responsibility as a city is to make sure 16 00:01:13,600 --> 00:01:20,880 that our land use regulations keep pace with emerging trends in a way that 17 00:01:18,560 --> 00:01:24,320 reflects our community's values and priorities. So that's really what we're 18 00:01:22,479 --> 00:01:27,320 trying to do with these proposed regulations. 19 00:01:32,240 --> 00:01:40,400 Okay. So how tonight will go, what we are here to do. We're going to explain a 20 00:01:37,840 --> 00:01:43,920 little bit of background um why we're here, how we got here in terms of 21 00:01:42,000 --> 00:01:46,960 developing these regulations, talk a little bit about some existing city 22 00:01:45,439 --> 00:01:52,479 policy um and existing regulations. 23 00:01:49,920 --> 00:01:56,240 um talk about the process so far to develop regulations for large scale data 24 00:01:54,240 --> 00:02:00,719 centers um including our technical advisory committee and then share an 25 00:01:58,799 --> 00:02:05,840 overview of the proposed regulations for large scale data centers um and have 26 00:02:03,520 --> 00:02:10,239 opportunity for feedback along the way. So tonight's meeting is really about 27 00:02:07,600 --> 00:02:15,280 sharing some information about what's proposed and then most importantly 28 00:02:13,280 --> 00:02:19,280 hearing from all of you. So there's going to be opportunity for feedback 29 00:02:16,959 --> 00:02:23,920 throughout the presentation and then at the end we do want to have time for 30 00:02:21,599 --> 00:02:29,280 questions and answers. So we do ask that during the presentation um we limit 31 00:02:27,200 --> 00:02:35,599 questions and comments to just clarifying questions um so that at the 32 00:02:32,080 --> 00:02:40,560 end we can have some dialogue and Q&A about this topic. 33 00:02:37,760 --> 00:02:44,959 Um and there's also going to be there's um comment cards and other ways to get 34 00:02:42,239 --> 00:02:49,360 input as well. Um, we have already gotten a lot of input and feedback on 35 00:02:47,280 --> 00:02:55,680 this topic. Um, and we've started developing a Q&A FAQ uh, form that some 36 00:02:53,599 --> 00:02:59,280 of you may have gotten when you came in. So, we've really tried to take a lot of 37 00:02:57,440 --> 00:03:03,120 the key questions and comments that we're getting and start responding to 38 00:03:01,200 --> 00:03:07,840 those and we will be building out that FAQ as we go through this process and 39 00:03:05,840 --> 00:03:12,319 get additional questions and comments. So all of your feedback is being 40 00:03:09,440 --> 00:03:20,159 reviewed by staff and uh responded to and integrated into the process. 41 00:03:16,480 --> 00:03:25,040 So how we got here? Um we are here based on direction from our mayor council to 42 00:03:22,480 --> 00:03:30,000 establish guardrails for our community related to large scale data centers. 43 00:03:27,840 --> 00:03:36,159 Following the consideration of the project blue proposal, mayor and council 44 00:03:32,799 --> 00:03:42,879 gave us direction to establish guard rails for our community to develop a 45 00:03:38,319 --> 00:03:48,480 regulatory framework for the for the use uh of large scale data centers to 46 00:03:45,120 --> 00:03:53,680 protect Tucson and our resources and to develop standards for this new use as 47 00:03:51,200 --> 00:03:58,159 well as a review process. So throughout the discussion of project 48 00:03:55,440 --> 00:04:01,920 bloom, we heard a range of questions and concerns about large scale data centers. 49 00:04:00,319 --> 00:04:08,720 We heard from residents about issues such as water, energy use, noise, visual 50 00:04:05,200 --> 00:04:13,439 impacts, whole range of community concerns and issues um which are very 51 00:04:11,040 --> 00:04:17,519 important topics and a conversation that really affects our whole community and 52 00:04:15,200 --> 00:04:21,600 quality of life. That's why we're here today to engage in this dialogue and 53 00:04:19,680 --> 00:04:26,639 have more conversation about the impact of this use and how we can ensure that 54 00:04:23,919 --> 00:04:31,840 we have appropriate regulations in place to regulate um this emerging use. As we 55 00:04:30,560 --> 00:04:36,160 were going through the project blue discussion, we found that our zoning 56 00:04:33,440 --> 00:04:40,800 code does not currently have data centers as a clearly defined land use. 57 00:04:38,720 --> 00:04:45,600 So we don't have regulations for this type of use. This creates a lack of 58 00:04:43,600 --> 00:04:49,759 clarity for our community, creates uncertainty for neighborhoods, for our 59 00:04:47,120 --> 00:04:54,880 policy makers, um, and for potential applicants. So, what we're trying to do 60 00:04:52,160 --> 00:05:00,720 now is take a more proactive approach to develop these regulations and guard 61 00:04:56,720 --> 00:05:05,600 rails. Um, so rather than reacting to a specific proposal, we're here trying to 62 00:05:03,440 --> 00:05:10,639 establish clear and enforceable guidelines um, in advance of future 63 00:05:08,160 --> 00:05:15,840 proposals. So what we're trying to do is create clear standards that protect our 64 00:05:13,199 --> 00:05:21,360 neighborhoods, our natural resources, and provide predictability so that if a 65 00:05:19,039 --> 00:05:26,880 data center facility is proposed, we have an appropriate set of land use 66 00:05:23,440 --> 00:05:31,440 regulations and standards to evaluate a proposed development. 67 00:05:29,520 --> 00:05:35,919 Based on the direction from mayor council, we have done a quite a bit of 68 00:05:33,520 --> 00:05:39,919 research into data center regulations in other communities as well as the impact 69 00:05:37,600 --> 00:05:44,320 of data centers in other communities and we established a technical advisory 70 00:05:41,840 --> 00:05:49,039 committee to help inform the proposed standards that we're creating. We also 71 00:05:46,560 --> 00:05:53,199 developed a large quantity water users ordinance in the city. That was actually 72 00:05:50,560 --> 00:05:57,919 something that was in progress um prior to the project blue discussion and that 73 00:05:54,960 --> 00:06:02,400 has been adopted by the city um and is being refined now based on public input. 74 00:06:00,479 --> 00:06:06,240 That ordinance is meant to work in parallel with these proposed zoning 75 00:06:04,319 --> 00:06:10,080 regulations for large scale data centers and we'll share a bit more about that a 76 00:06:08,080 --> 00:06:13,919 little later on. So again, tonight's meeting is not to discuss a specific 77 00:06:11,919 --> 00:06:18,319 proposal. The discussion tonight is about setting guard rails and 78 00:06:16,000 --> 00:06:23,360 establishing standards for our community so that if a proposal comes forward, we 79 00:06:20,880 --> 00:06:28,720 have conditions and a process in place to evaluate any proposals. 80 00:06:26,960 --> 00:06:32,880 So, I want to talk a little bit more about zoning regulations because zoning, 81 00:06:31,759 --> 00:06:38,000 which is what we're here to talk about tonight, is just one piece of a larger 82 00:06:35,440 --> 00:06:42,240 picture in terms of regulations that affect large scale data centers. So 83 00:06:40,160 --> 00:06:46,319 there's other local regulations that could shape where and how large scale 84 00:06:44,400 --> 00:06:50,560 data centers are developed. That includes things like the large quantity 85 00:06:48,479 --> 00:06:56,240 water user ordinance that I mentioned as well as economic development policies 86 00:06:53,280 --> 00:07:01,199 and other city policies. Um there's also federal and state regulations that come 87 00:06:58,319 --> 00:07:05,520 into play such as state economic incentives and the Arizona Pooperation 88 00:07:03,680 --> 00:07:11,759 Commission's regulation of our utilities. So tonight's discussion is 89 00:07:08,400 --> 00:07:17,759 really focused on zoning and land use regulations. 90 00:07:13,919 --> 00:07:22,240 Zoning is a uh zoning is a set of regulations that focus on where 91 00:07:20,080 --> 00:07:27,840 development can occur, where different uses can be located, how those uses are 92 00:07:25,280 --> 00:07:31,759 built, what specific conditions apply to different types of land uses. um that 93 00:07:30,080 --> 00:07:36,240 could be conditions, development standards like buffers, setbacks, 94 00:07:33,759 --> 00:07:41,280 screening, height limits, c certain standards like that that can be applied 95 00:07:38,000 --> 00:07:49,520 to specific types of uses. Um so zoning does not regulate water 96 00:07:45,360 --> 00:07:54,400 use, energy portfolios or energy infrastructure decisions. um those are 97 00:07:52,479 --> 00:07:59,199 valid and important topics of discussion, but those rest with other 98 00:07:57,120 --> 00:08:02,879 review bodies and other entities that have purview in those areas. So 99 00:08:01,280 --> 00:08:07,440 tonight's discussion is really going to focus on what is within the city's 100 00:08:05,120 --> 00:08:12,479 control and what is before us at this time, which is zoning or land use 101 00:08:09,759 --> 00:08:16,800 regulations to provide appropriate standards and regulations for large 102 00:08:13,919 --> 00:08:21,599 scale data centers in Tucson. So let's get into that conversation. I 103 00:08:20,080 --> 00:08:25,199 want to thank you again for being here tonight, for being part of this 104 00:08:23,120 --> 00:08:33,800 important conversation. And I'm going to ask Tonnie to walk us through the 105 00:08:29,039 --> 00:08:33,800 process and ground rules for tonight. 106 00:08:34,800 --> 00:08:42,560 Good evening. Good to see you all. Uh my name is Tony Robertson with Southwest 107 00:08:39,599 --> 00:08:47,200 Decision Resources and I just have two slides. [snorts] 108 00:08:44,880 --> 00:08:53,120 Meeting format. I think we've seen several of you were in the last meeting 109 00:08:49,440 --> 00:08:59,680 or two. So, good to see you again. Um, so your feedback is going to be 110 00:08:55,600 --> 00:09:05,519 collected in writing in these meetings via online survey which you'll be seeing 111 00:09:02,880 --> 00:09:10,880 a QR code and you can use your phone to get access to that website. Um, the 112 00:09:08,880 --> 00:09:16,800 paper form, the green form on the clipboard is the same questions. So 113 00:09:13,519 --> 00:09:20,320 either option works and you can take uh provide your comments during the meeting 114 00:09:18,480 --> 00:09:25,360 or after the meeting. I believe it'll be open through this month through the end 115 00:09:22,000 --> 00:09:30,080 of March. Um and then the sticky notes on the posters in the lobby. All of that 116 00:09:27,440 --> 00:09:34,720 feedback is being compiled and the city team is reading through everything very 117 00:09:31,760 --> 00:09:38,800 carefully. They did create the FAQ document that was in the registration 118 00:09:36,800 --> 00:09:45,680 table like Corin mentioned and they'll be adding more questions as they go. Um 119 00:09:43,519 --> 00:09:49,440 again, all written feedback will be made publicly available and shared with both 120 00:09:47,839 --> 00:09:54,080 the planning commission and mayor and council. Uh conversation and additional 121 00:09:52,800 --> 00:09:58,160 written feedback are encouraged with city staff before and after the 122 00:09:56,480 --> 00:10:04,160 presentation um we will have a like the last inerson 123 00:10:01,839 --> 00:10:09,120 meeting at Pua High School will have a Q&A session here in the main in this 124 00:10:06,800 --> 00:10:12,959 room. Um, we're going to be asking that people keep their comments to under a 125 00:10:11,120 --> 00:10:16,640 minute so that more people can have a chance to speak. We had a number of 126 00:10:14,560 --> 00:10:20,560 people that wanted to be able to ask a question or make a comment last time. 127 00:10:19,040 --> 00:10:25,040 Um, this the website has all of the links, 128 00:10:22,640 --> 00:10:31,800 all of the information and uh we ask that everybody respect each other's time 129 00:10:27,680 --> 00:10:31,800 and refrain from disruption. 130 00:10:32,000 --> 00:10:39,040 And again, so in this room is the presentation. 131 00:10:36,959 --> 00:10:42,640 Um, we have different presenters from the city that are going to be walking 132 00:10:40,399 --> 00:10:48,959 you through the different components of the proposed zoning code and giving you 133 00:10:45,760 --> 00:10:55,279 a chance as you go to make comments in the uh online survey or the written 134 00:10:51,200 --> 00:11:00,959 survey. Um feedback again can be submitted in both both of those formats 135 00:10:58,000 --> 00:11:06,079 in and then the the uh the Q&A afterwards in the lobby is the dialogue 136 00:11:03,839 --> 00:11:09,200 opportunity directly with city staff. You're not restricted to any particular 137 00:11:07,680 --> 00:11:13,440 amount of time. There's posters that have all the same information that's 138 00:11:10,800 --> 00:11:19,360 going to be in the presentation. Again, this is about this proposed zoning uh 139 00:11:16,399 --> 00:11:25,120 code, but you a lot of you have feedback beyond that and we're gathering all 140 00:11:21,360 --> 00:11:28,120 feedback. So, I will turn it over to Parker. 141 00:11:40,720 --> 00:11:46,480 » All right. Good evening. Uh my name is Carver Stru. I'm a principal planner 142 00:11:44,640 --> 00:11:50,399 here with the City of Tucson Department of Planning and Development Services and 143 00:11:48,800 --> 00:11:55,360 I'm going to talk a bit about the proposal that that we are here to 144 00:11:52,800 --> 00:12:00,560 discuss tonight. Um as was mentioned earlier, this relates specifically to 145 00:11:57,680 --> 00:12:04,560 zoning and regulating largecale data centers. One of the first things that 146 00:12:02,560 --> 00:12:10,000 you want to do if you are going to regulate a land use is to define what it 147 00:12:07,519 --> 00:12:15,600 is that you're regulating. And so what we've put forward Oh, I'm sorry. Let me 148 00:12:12,639 --> 00:12:19,519 back up. Um going going a little ahead of myself. Uh I want to start talking 149 00:12:17,440 --> 00:12:22,880 first about what is a large-scale data center. So what is it that we're talking 150 00:12:21,279 --> 00:12:28,000 about before we start discussing regulating it? So a large scale data 151 00:12:25,519 --> 00:12:33,600 center is a warehouse filled with thousands of computers working 24/7 to 152 00:12:30,959 --> 00:12:38,000 store, process, and deliver digital services and data. uh data centers house 153 00:12:36,320 --> 00:12:42,880 computer equipment, networking equipment, storage devices. These are 154 00:12:40,720 --> 00:12:48,800 the items that power all of the digital infrastructure that we use. 155 00:12:47,120 --> 00:12:53,360 Most data centers have a number of different key components. Um these 156 00:12:50,800 --> 00:12:58,480 include server racks uh that house and organize servers, networking equipment 157 00:12:56,320 --> 00:13:04,000 uh which moves the data or processes the data, storage systems to store data, uh 158 00:13:01,600 --> 00:13:09,440 power infrastructure which obviously powers the equipment and cooling systems 159 00:13:06,800 --> 00:13:12,760 to remove the heat that is created by a data center. 160 00:13:13,200 --> 00:13:21,360 So really when we're asked to regulate data centers, the the purpose there is 161 00:13:18,480 --> 00:13:26,240 to set clear rules and standards for their location and design. The intent of 162 00:13:24,160 --> 00:13:32,000 this is to protect senate sensitive areas. Address impacts such as noise, 163 00:13:29,200 --> 00:13:37,040 scale, and other impacts early on in the process. Develop a process that ensures 164 00:13:34,800 --> 00:13:43,200 public input as data center proposals are developed. and be proactive in terms 165 00:13:40,240 --> 00:13:50,560 of what standards should be in place versus uh reacting to a specific 166 00:13:46,240 --> 00:13:58,560 proposal as it comes forward. So the city currently has very limited 167 00:13:55,120 --> 00:14:03,360 standards related to how we regulate data centers. Traditionally as data 168 00:14:01,519 --> 00:14:10,000 centers were being developed is they were small relatively small they were 169 00:14:05,839 --> 00:14:14,480 viewed as storage uses um these were you know it made sense you're looking at it 170 00:14:11,440 --> 00:14:20,880 kind of like as a warehouse but for data and so they were regulated as such. 171 00:14:17,279 --> 00:14:26,560 However, as we saw new large scale and hypers scale data centers emerge as a 172 00:14:23,360 --> 00:14:30,639 land use that has never existed before, we started to look at it differently. 173 00:14:28,480 --> 00:14:35,440 And the city zoning administrator determined that a large-scale data 174 00:14:32,880 --> 00:14:41,519 center would be classified under the city's zoning code as a utility 175 00:14:38,160 --> 00:14:46,480 generating system use. As such, it could only be reviewed as a planned area 176 00:14:44,560 --> 00:14:50,720 development or a planned community development. 177 00:14:48,000 --> 00:14:57,360 Um, so this is really just defining what it would be as a stop gap measure and 178 00:14:54,480 --> 00:15:02,880 deciding what process could be used to review a proposal for a data center. 179 00:15:00,399 --> 00:15:08,079 Under the current code, it's very clear that we really don't have any existing 180 00:15:05,600 --> 00:15:12,160 standards to regulate their development or place guard rails on their 181 00:15:09,760 --> 00:15:16,480 development. As such, it's really at this point in time under the code 182 00:15:14,079 --> 00:15:21,920 largely up to a specific applicant to propose how they would like to develop a 183 00:15:19,199 --> 00:15:26,480 data center. Uh so with additional standards as we're going to be 184 00:15:23,760 --> 00:15:32,000 discussing tonight uh mayor and council can provide limitations or guard rails 185 00:15:29,440 --> 00:15:38,480 on how data centers would be developed which could reflect values of Tucson. 186 00:15:35,199 --> 00:15:44,320 So this next slide really just shows what is currently in place under the red 187 00:15:41,279 --> 00:15:51,199 box which is essentially just a process for reviewing a data center proposal and 188 00:15:47,839 --> 00:15:57,440 then proposed standards that we are putting forward in this proposed zoning 189 00:15:54,560 --> 00:16:01,920 amendment and seeking your feedback on related to any number of things. you 190 00:16:00,160 --> 00:16:06,959 know, defining a data center, establishing where and how they would be 191 00:16:03,519 --> 00:16:12,240 allowed. Um, being establishing a clear and transparent public review process 192 00:16:09,199 --> 00:16:18,399 for specific data center proposals, requiring that a data center demonstrate 193 00:16:14,959 --> 00:16:25,120 access to water and power and disclose the energy mix in such a proposal. Um, 194 00:16:22,800 --> 00:16:29,680 prohibit the use of portable water for cooling if not subject to the large 195 00:16:27,040 --> 00:16:34,240 water user ordinance. requiring additional setbacks which would relate 196 00:16:31,759 --> 00:16:38,480 to noise impacts or other impacts on the community setting clear noise 197 00:16:36,240 --> 00:16:42,399 limitations any number of different items and we'll be going through these 198 00:16:40,560 --> 00:16:46,320 in in subsequent slides but I really just want to make the point that this 199 00:16:44,480 --> 00:16:51,680 demonstrates where we are looking at establishing regulations for where none 200 00:16:49,120 --> 00:16:54,680 currently exist other than that simple process. 201 00:16:54,720 --> 00:17:03,199 So as we talk about zoning, uh any authority to regulate land through 202 00:17:00,160 --> 00:17:08,160 zoning by a city or town in Arizona is given to them by the state. State law 203 00:17:05,919 --> 00:17:13,120 decides what can be regulated through zoning and is very specific that that 204 00:17:10,959 --> 00:17:18,880 the cities or towns can regulate land use, building size, shape, height, 205 00:17:15,919 --> 00:17:22,959 materials and purpose, site dimensions, setbacks, lot coverage, what percentage 206 00:17:21,520 --> 00:17:28,240 of the lot would be covered by a structure and the location and use of 207 00:17:25,120 --> 00:17:35,120 buildings. However, we are limited through zoning on what can be regulated 208 00:17:31,760 --> 00:17:39,200 related to water and energy use. Uh, however, there are other provisions as 209 00:17:36,960 --> 00:17:45,679 as Corin had mentioned, zoning is simply one component of the entire process to 210 00:17:42,720 --> 00:17:49,919 regulate data centers. Um, and as mentioned earlier, uh, it's critical to 211 00:17:47,760 --> 00:17:54,960 define a data center when you are looking to regulate it. Additionally, 212 00:17:52,640 --> 00:18:00,400 due to the processes in place as well as the process being proposed, any data 213 00:17:57,679 --> 00:18:07,240 center proposal would need to comply with plan Tucson 2025, our new general 214 00:18:04,240 --> 00:18:07,240 plan. 215 00:18:07,600 --> 00:18:18,080 So the process for reviewing and considering and developing reviewing and 216 00:18:14,080 --> 00:18:24,160 considering a ordinance for uh zoning regulations for large-scale data centers 217 00:18:20,880 --> 00:18:29,200 is is outlined here. Um it begins with mayor and council direction where Marin 218 00:18:26,240 --> 00:18:34,799 council requested that city staff develop this code proposal. Uh we then 219 00:18:32,480 --> 00:18:39,440 formed a technical advisory committee which is an advisory committee made up 220 00:18:37,360 --> 00:18:45,760 of volunteer subject matter experts across a broad array of areas related to 221 00:18:42,559 --> 00:18:52,320 data centers who provided information and best practices on regulating data 222 00:18:48,640 --> 00:18:56,880 centers. From there we moved into our community meetings. This is the fourth 223 00:18:54,559 --> 00:19:01,520 of four community meetings that we have scheduled. two in person and two virtual 224 00:18:59,520 --> 00:19:06,799 to receive community feedback on the proposal. Now, for those of you who have 225 00:19:04,320 --> 00:19:11,520 been to the previous meetings, the the rest of this is a little bit different. 226 00:19:08,960 --> 00:19:17,039 Um, we've received some guidance that mayor and council would like us to uh go 227 00:19:14,160 --> 00:19:20,880 before them in April for a study session to brief and council on what we have 228 00:19:19,039 --> 00:19:25,840 heard in these community meetings and receive feedback. And so, that is the 229 00:19:23,520 --> 00:19:30,400 next step in the process that that will be forthcoming. that is not a vote on 230 00:19:27,840 --> 00:19:35,360 anything. That is simply a study session to brief them. Um, as we go through that 231 00:19:33,760 --> 00:19:40,000 process, we'll continue to gather community feedback. The survey will 232 00:19:37,360 --> 00:19:45,120 remain open and then based on feedback we received. Uh the next steps in the 233 00:19:42,160 --> 00:19:50,240 process are a planning commission study session at a time yet to be determined, 234 00:19:47,760 --> 00:19:55,039 a planning commission public hearing where the public will be invited to 235 00:19:52,720 --> 00:19:59,039 speak specifically on this proposal yet to be determined and then mayor and 236 00:19:56,640 --> 00:20:02,720 council consideration. So more to come on that and certainly as we have more 237 00:20:00,880 --> 00:20:08,320 information on the specifics, we will be updating our web page on that. 238 00:20:06,720 --> 00:20:13,520 So, as we're considering developing these regulations, we are really looking 239 00:20:11,039 --> 00:20:18,240 at guidance from other plans and policies that are currently in effect 240 00:20:16,080 --> 00:20:23,039 within the city. These are plans and policies which have either been ratified 241 00:20:20,160 --> 00:20:27,520 by the voters in the case of plan Tucson or adopted by mayor and council as 242 00:20:25,200 --> 00:20:32,080 official policy. These include, as I mentioned, plan Tucson, uh the Tucson 243 00:20:30,159 --> 00:20:37,120 resilient together, which is our climate action plan, the city's comprehensive 244 00:20:34,559 --> 00:20:43,360 economic development strategy, the one water 2100 master plan, the large 245 00:20:40,880 --> 00:20:47,840 quantity water user ordinance, building codes, as well as other provisions 246 00:20:45,919 --> 00:20:51,919 within within the unified development code, which is our zoning code. uh 247 00:20:50,320 --> 00:20:56,720 things related to items such as rainwater harvesting or um other 248 00:20:54,880 --> 00:21:02,080 development standards that would be applicable for a structure like a data 249 00:20:59,760 --> 00:21:07,120 center just like they apply already to any other structure uh within the city. 250 00:21:05,520 --> 00:21:12,000 So the one item that I mentioned there is the large quantity water users 251 00:21:08,960 --> 00:21:17,760 ordinance and we've got Scott Shadweller here who is going to speak a little bit 252 00:21:14,159 --> 00:21:20,880 about that from Tucson water. >> All right. Thanks Carver. Good evening 253 00:21:19,360 --> 00:21:24,960 everybody. As Cover mentioned, my name is Scott Schwab. I'm deputy director at 254 00:21:22,640 --> 00:21:30,320 Tucson Water. Uh, similar to this ordinance, um, we developed a large body 255 00:21:27,280 --> 00:21:33,679 water user ordinance. Um, last year, uh, it was put in place because we didn't 256 00:21:31,919 --> 00:21:38,240 have any guardrails up. We didn't have any, um, guidance on thresholds for 257 00:21:36,400 --> 00:21:43,280 water use. So, when a new developer, a new development, um, came to Tucson 258 00:21:40,320 --> 00:21:46,080 looking for water, looking to develop, um, we worked out the engineering piece, 259 00:21:44,880 --> 00:21:50,720 we worked out the hydraulics and whatever infrastructure was required. um 260 00:21:48,640 --> 00:21:55,039 you know we move forward with that if uh if applicable. So the large quality of 261 00:21:53,120 --> 00:22:00,640 water users ordinance was approved by mayor and council in August of 25. Uh it 262 00:21:58,000 --> 00:22:06,720 is in place today. Um it really sets the guardrails for um establishing what uh 263 00:22:04,799 --> 00:22:12,320 you know defining what a large water quantity user is. And that threshold was 264 00:22:09,280 --> 00:22:18,240 set at 10,000 ccf or that was the equivalent of about 7.4 7.5 million 265 00:22:16,080 --> 00:22:22,559 gallons per month. That's an annual average. Uh so they could use a little 266 00:22:20,400 --> 00:22:26,720 bit more one month or a little bit less one a month, you know, taking into 267 00:22:23,919 --> 00:22:31,120 account for weather, things like that. Um just to put that into context, our 268 00:22:28,960 --> 00:22:36,000 average residential user uses about 8 CCF. Um so this is the equivalent of 269 00:22:33,520 --> 00:22:40,640 about 1,200 single family homes or so. We do not have any portable customers on 270 00:22:38,320 --> 00:22:45,280 our system right now that use 10,000 ccf or more. We do have some on the reclam 271 00:22:42,799 --> 00:22:51,120 system, but those are mostly tied to large uses such as golf courses or 272 00:22:48,000 --> 00:22:55,360 whatnot. Um, so this ordinance applies to any large water user. In fact, this 273 00:22:53,840 --> 00:23:00,159 ordinance does not specifically call out data centers. It does not mention them 274 00:22:57,679 --> 00:23:04,640 um by name at all. It is any large water user that comes. So, any potential 275 00:23:02,000 --> 00:23:08,240 manufacturer um any other type of user that would use this much water. It 276 00:23:06,320 --> 00:23:12,159 applies to any new development uh that comes in. So from the ground up uh it 277 00:23:10,640 --> 00:23:16,400 would also apply to anybody who wants to upgrade their facility. Uh for example, 278 00:23:14,000 --> 00:23:22,159 if they want to expand services and go from uh you know a certain meter size up 279 00:23:19,120 --> 00:23:27,679 to above 10,000 ccf, they would have to comply with this ordinance as well. Um 280 00:23:25,440 --> 00:23:32,320 what is required by this policy? Uh any large water users would have to submit a 281 00:23:29,760 --> 00:23:36,960 sustainable uh water service application which includes a conservation plan uh to 282 00:23:34,640 --> 00:23:39,679 Tucson Water for review. Uh this includes things like defining how 283 00:23:38,640 --> 00:23:42,960 they're going to use the water, what they're going to use, what their 284 00:23:40,640 --> 00:23:48,559 conservation policies are. Um is it being done in the most efficient way? Uh 285 00:23:46,400 --> 00:23:52,880 if deemed complete by Tucson Water, it will be put before mayor and council for 286 00:23:50,240 --> 00:23:57,200 their ultimate approval. Um where it will be presented. So that ultimately 287 00:23:54,640 --> 00:24:02,400 this is each large water unit does need to be approved by mayor and council. Uh 288 00:23:59,840 --> 00:24:06,320 similar to this ordinance as well, we did have a technical advisory committee 289 00:24:04,559 --> 00:24:10,080 uh that finished up just recently. We have stakeholders from the community 290 00:24:07,679 --> 00:24:15,520 from the economic development uh side, the environmental uh stakeholder groups. 291 00:24:13,279 --> 00:24:19,760 Um they all provided comments that information was presented to mayor and 292 00:24:17,039 --> 00:24:24,559 council uh last month uh for their review. So that is that's information 293 00:24:21,919 --> 00:24:28,799 that they are uh looking over right now. And if they do deem uh you know any 294 00:24:26,960 --> 00:24:33,840 updates or any modifications of the policy necessary, that's something I'll 295 00:24:30,400 --> 00:24:37,559 come back for in future months. That'll turn back over. 296 00:24:43,679 --> 00:24:47,159 » Thank you, Scott. 297 00:24:48,240 --> 00:24:54,720 So Scott mentioned a technical advisory committee for the large quantity water 298 00:24:52,159 --> 00:24:59,919 users ordinance. Uh I want to clarify that there was also a technical advisory 299 00:24:56,960 --> 00:25:04,000 committee formed for the data cent's zoning code amendment. They are two 300 00:25:02,080 --> 00:25:08,559 different bodies. So just just to clarify that they're comprised of of two 301 00:25:06,320 --> 00:25:14,000 different groups of people. However, the technical advisory committee for data 302 00:25:10,720 --> 00:25:18,559 centers uh was established based on direction that we received from mayor 303 00:25:15,840 --> 00:25:23,279 and council. Uh its purpose was to share knowledge and expertise and discuss key 304 00:25:20,799 --> 00:25:28,159 issues related to land use environmental concerns, resource consumptions, 305 00:25:25,840 --> 00:25:33,120 particularly water and power as well as infrastructure needs for data centers. 306 00:25:30,559 --> 00:25:38,720 The committee was formed to uh help us all learn about and provide input or on 307 00:25:35,520 --> 00:25:43,840 best practices, new technologies and approaches that were undertaken in 308 00:25:40,880 --> 00:25:48,640 other cities or jurisdictions. Uh the TAC was asked to advise on options to 309 00:25:46,400 --> 00:25:53,360 regulate large-scale data centers and recommend topics and standards for the 310 00:25:51,200 --> 00:25:57,279 proposed zoning amendment. I want to be clear that the TAC is not a 311 00:25:55,039 --> 00:26:03,039 decision-making body. They were simply advisory that were providing input into 312 00:26:00,320 --> 00:26:09,279 the proposed standards. Uh there there was a desire for consensus, but it 313 00:26:06,400 --> 00:26:14,000 wasn't always achieved. And so it we aren't necessarily saying that every TAC 314 00:26:11,120 --> 00:26:20,320 member agreed with everything that um came out of the recommendations but they 315 00:26:16,480 --> 00:26:25,679 did provide advisory input. So the TAC uh includes 13 members from 316 00:26:23,440 --> 00:26:30,559 various groups. Uh they range from watershed management to TE. So really we 317 00:26:28,720 --> 00:26:35,520 tried to get as many different groups as we could involved in the committee to 318 00:26:32,799 --> 00:26:41,440 provide their input. Um, additionally, we have uh had support from city staff 319 00:26:39,039 --> 00:26:46,080 across multiple different departments. Uh, they were not members of the TAC, 320 00:26:43,039 --> 00:26:51,360 but they did provide input uh related to uh sustainability, energy use, uh, water 321 00:26:48,960 --> 00:26:55,679 resources, economic development, um, just across multiple areas to ensure 322 00:26:53,919 --> 00:27:01,760 that multiple different viewpoints were considered when when developing uh, some 323 00:26:58,799 --> 00:27:05,760 of the proposed components. Um and again these these the members of the TAC 324 00:27:03,760 --> 00:27:10,640 included environmental resources, power supply, energy equity, people also 325 00:27:08,480 --> 00:27:16,799 involved in data consent data center construction as well as people involved 326 00:27:13,600 --> 00:27:23,200 in the operation of data centers locally within Tucson. 327 00:27:20,000 --> 00:27:27,600 Uh we also looked at uh what the TAC thought was important at the very 328 00:27:25,120 --> 00:27:33,679 beginning of the process. uh we surveyed TAC members on what components were of 329 00:27:30,880 --> 00:27:39,440 greatest concern to them individually. Uh the feedback we received um was that 330 00:27:36,880 --> 00:27:44,159 water and energy consumption were of greatest concern which is something we 331 00:27:41,760 --> 00:27:50,480 certainly are aware of. Um air quality concerns also came ranked fairly high as 332 00:27:47,520 --> 00:27:56,480 did noise concerns and that was also really closely related to setback from 333 00:27:53,600 --> 00:28:00,960 adjoining land uses. uh so that and location so that they could be in areas 334 00:27:59,039 --> 00:28:05,840 that that were not already heavily developed. Uh concerns were also 335 00:28:03,200 --> 00:28:10,480 expressed about heat impacts uh provision of wildlife amenities, 336 00:28:08,240 --> 00:28:15,679 generator operation which certainly also relates back to noise and air quality 337 00:28:13,200 --> 00:28:21,440 glare design aesthetic screening vibration which also relates to noise 338 00:28:18,320 --> 00:28:26,240 and design features. Uh this is not ultimately the category of items that a 339 00:28:24,080 --> 00:28:31,120 category list of items that we came up with but during the process of kind of 340 00:28:28,880 --> 00:28:36,960 establishing where the concerns were it was a useful exercise of the TAC. Uh all 341 00:28:34,480 --> 00:28:41,600 tech materials related to the meetings including meeting notes and presentation 342 00:28:39,120 --> 00:28:46,559 slides are available on the city's website uh which we will have a QR code 343 00:28:44,000 --> 00:28:52,240 for later in the presentation uh if you would like to review those. 344 00:28:50,399 --> 00:28:56,159 So now we're going to shift gears a little bit and talk about the actual 345 00:28:53,919 --> 00:29:03,440 zoning proposal that that we would like to get your feedback on this evening. 346 00:29:00,159 --> 00:29:08,880 So when we developed these proposed standards for large scale data centers 347 00:29:06,399 --> 00:29:12,720 uh we we essentially divided them into five specific categories which we're 348 00:29:10,960 --> 00:29:18,640 going to talk about individually and then poll feedback on. These include the 349 00:29:15,520 --> 00:29:24,640 definition, review process and location proposal for large-scale data centers, 350 00:29:21,760 --> 00:29:29,840 energy and water use and sourcing to the extent that we can regulate it through 351 00:29:26,480 --> 00:29:38,120 zoning setbacks, environmental compatibility, landscaping and parking 352 00:29:32,000 --> 00:29:38,120 standards and noise and generator use. 353 00:29:38,559 --> 00:29:47,679 So during the these presentation slides, uh we're asking or providing the 354 00:29:45,039 --> 00:29:53,120 opportunity for you to provide feedback on each of these proposals. Uh this can 355 00:29:50,480 --> 00:29:58,080 be done either through a QR code which will be up on the screen um in just a 356 00:29:55,120 --> 00:30:02,399 little bit or the paper sheets that some of you have as well. If you'd rather 357 00:29:59,679 --> 00:30:06,399 provide that information that way, we'll certainly accept it as well. I want to 358 00:30:04,159 --> 00:30:11,520 emphasize that both of those are the same sets of questions. They will go 359 00:30:09,039 --> 00:30:17,279 into the same set of documented responses that will be posted on the 360 00:30:14,799 --> 00:30:22,960 website and also provided to mayor and counsel and the planning commission as 361 00:30:20,000 --> 00:30:27,679 feedback that we've received on this um on this proposal. Uh there will also be 362 00:30:25,600 --> 00:30:33,200 the question and answer comment period and then additional time in the lobby 363 00:30:29,919 --> 00:30:38,240 for uh people to provide further feedback. 364 00:30:34,960 --> 00:30:43,520 So uh the next slide is really for those of you who want to get into the survey. 365 00:30:41,200 --> 00:30:49,120 This is the QR code that links to the survey. It's a series of questions that 366 00:30:46,240 --> 00:30:53,039 we'll go through section by section. Um, if you don't want to do the survey 367 00:30:51,120 --> 00:30:56,480 online, but you want to provide information, feel free to raise your 368 00:30:54,640 --> 00:31:02,240 hand. We've got some people out here who can provide paper forms as well if you'd 369 00:30:59,200 --> 00:31:07,039 rather do that. The first two questions on the online survey are name and email 370 00:31:04,399 --> 00:31:11,520 address. You are welcome to provide that if you want. We do not require that as a 371 00:31:09,360 --> 00:31:16,480 required question. If you don't want to provide that, we can simply move to the 372 00:31:14,159 --> 00:31:22,240 next questions as we get through the process. But that's what you should be 373 00:31:19,039 --> 00:31:27,360 seeing if you're getting online. Okay. Now, we're going to talk about the 374 00:31:24,880 --> 00:31:32,080 definition of a proposed large scale data center. Uh, as I mentioned earlier, 375 00:31:30,000 --> 00:31:35,520 » that slide to accommodate people with disabilities that may not be quick 376 00:31:34,000 --> 00:31:36,880 enough to get QR code. >> Certainly. 377 00:31:36,240 --> 00:31:41,039 » Thank you. >> And the QR code will also be posted at 378 00:31:39,279 --> 00:31:44,960 each set of survey questions. So, if you're unable to capture it here, we can 379 00:31:43,200 --> 00:31:49,919 capture it at each survey question as well. It's the same QR code. 380 00:31:48,240 --> 00:31:53,799 Has everybody had the opportunity to capture the QR code? 381 00:31:54,720 --> 00:31:57,720 Okay. 382 00:31:57,919 --> 00:32:04,559 So, the next item is the definition of a proposed large-scale data center. As I 383 00:32:03,120 --> 00:32:09,600 mentioned earlier, defining a large-scale data center is key to 384 00:32:06,240 --> 00:32:15,519 regulating them. Uh currently we looked at how large the data centers are that 385 00:32:12,559 --> 00:32:22,240 we have within the city of Tucson and saw a natural break at around 30 to 386 00:32:18,640 --> 00:32:26,880 40,000 square ft. And we're looking at those are the smaller data centers that 387 00:32:24,559 --> 00:32:31,840 we've just seen develop throughout time in the city. And so we wanted to 388 00:32:29,519 --> 00:32:36,960 establish standards for the larger scale ones that we are seeing being proposed 389 00:32:34,320 --> 00:32:43,919 elsewhere. And so we established a proposed 50,000 square foot threshold 390 00:32:40,480 --> 00:32:47,840 where a data center above 50,000 square feet would be classified as a 391 00:32:45,760 --> 00:32:53,519 large-scale data center. In the definition, we also included a general 392 00:32:50,559 --> 00:33:00,480 description of equipment and use of the site. We also included language about 393 00:32:56,480 --> 00:33:05,120 ownership and uh it being part of a facility or multiple facilities um 394 00:33:03,360 --> 00:33:09,840 establishing this under contiguous ownership. So it's to avoid people 395 00:33:07,600 --> 00:33:13,360 trying to essentially circumvent the definition of a large scale data center 396 00:33:11,679 --> 00:33:18,559 by building a whole bunch of smaller data centers in in a line. And so the 397 00:33:16,480 --> 00:33:24,159 intent of this again proposed language is to uh establish something that would 398 00:33:21,760 --> 00:33:27,919 allow us to regulate large-scale data centers as they were developed. And we 399 00:33:26,399 --> 00:33:34,440 will have a question on that on the survey uh once we get through a couple 400 00:33:30,720 --> 00:33:34,440 of additional slides. 401 00:33:35,360 --> 00:33:43,973 So in addition to the definition, we would need to figure out where these 402 00:33:40,960 --> 00:33:48,159 might be permitted within the city. We [snorts] looked at our zoning code and 403 00:33:45,760 --> 00:33:54,080 determined that our existing I2 industrial zone would be the appropriate 404 00:33:50,799 --> 00:33:57,519 zoning district for a large scale data center. [clears throat] This is really 405 00:33:55,360 --> 00:34:03,440 the zoning district that is most intense and it's intended to be for those land 406 00:34:00,480 --> 00:34:08,000 uses that would provide the greatest impacts uh around the community. As 407 00:34:06,240 --> 00:34:12,159 such, these are the areas that are located, as you can see on the map, in 408 00:34:09,919 --> 00:34:17,760 areas with very little development that are far away from the urbanized areas of 409 00:34:14,320 --> 00:34:22,879 the city. So, we are proposing that data centers be permitted through a specific 410 00:34:20,800 --> 00:34:27,760 process called the Marin Council special exception, and I'll talk a little bit 411 00:34:24,399 --> 00:34:31,679 more about that within the I2 zone. So, this would be something that is not by 412 00:34:29,839 --> 00:34:36,079 right, meaning that somebody could not simply come in and say, I want to build 413 00:34:33,760 --> 00:34:40,879 a data center. Here's my build. You have my permit application. Approve it. It 414 00:34:38,480 --> 00:34:46,960 would be a process where there would be a public hearing before our zoning 415 00:34:43,280 --> 00:34:50,800 examiner who is the uh um quasi judicial reviewer. There would be a neighborhood 416 00:34:48,879 --> 00:34:55,200 meeting and there would be consideration by mayor and council. So there would be 417 00:34:53,040 --> 00:35:00,400 steps in the process that would be public for public input on any proposal 418 00:34:57,599 --> 00:35:04,880 for a data center. Um this is essentially the highest level of review 419 00:35:02,240 --> 00:35:10,800 that we have for any land use. It's it's kind of very similar to a reszoning that 420 00:35:08,079 --> 00:35:17,119 would take place within a community. So in addition to doing a merit council 421 00:35:13,119 --> 00:35:21,440 special exception uh within the I2 zone, we would also consider permitting data 422 00:35:20,000 --> 00:35:26,960 centers through a planned area development or a planned community 423 00:35:23,680 --> 00:35:32,000 development which are also very similar to a resoning where there would be the 424 00:35:29,599 --> 00:35:36,960 neighborhood meeting, zoning examiner review and merit council consideration. 425 00:35:34,720 --> 00:35:41,280 um those are very sort of project specific where there's a little bit more 426 00:35:39,119 --> 00:35:46,079 flexibility in the process but also the opportunity for additional community 427 00:35:43,359 --> 00:35:50,640 benefits. But it's really key to note in in those instances again that there 428 00:35:48,240 --> 00:35:54,040 would be a public process and mayor and council review. 429 00:35:55,119 --> 00:36:02,560 As I mentioned earlier, the process either through a Marin council special 430 00:36:00,160 --> 00:36:07,359 exception or a PAD or a PCD, planned area development or planned community 431 00:36:04,160 --> 00:36:12,400 development would require a neighborhood meeting. A neighborhood meeting is a 432 00:36:09,520 --> 00:36:19,119 public meeting where the public is invited to come to hear about the 433 00:36:15,760 --> 00:36:25,119 proposed data center project or whatever the project is um and ask questions of 434 00:36:22,240 --> 00:36:29,119 the developer at that point in time. Under our current zoning code, 435 00:36:27,040 --> 00:36:35,040 neighborhood meetings are required for any Marin Council special exception, any 436 00:36:32,240 --> 00:36:40,320 PAD or any PCD development. It is part of our process that is baked into all 437 00:36:37,440 --> 00:36:46,079 land use change. Under the current code for any of those, there's a notice 438 00:36:43,280 --> 00:36:49,760 requirement of 400 ft from the property line that property owners be notified of 439 00:36:48,400 --> 00:36:56,240 the neighborhood meeting and the proposed change as well as notification 440 00:36:53,599 --> 00:37:00,320 of all neighborhood associations within one mile. 441 00:36:58,079 --> 00:37:06,079 We are looking at propo or we are proposing extending that notification 442 00:37:03,119 --> 00:37:12,560 area due to the impacts of large-scale data centers as well as their potential 443 00:37:09,280 --> 00:37:17,280 location in largely rural areas. We're looking at extending that from 400 ft to 444 00:37:14,880 --> 00:37:21,200 half a mile and also requiring notification of all neighborhood 445 00:37:19,599 --> 00:37:25,839 associations within 2 miles. And so it's really 446 00:37:23,760 --> 00:37:31,359 seeking to have a broader notice area for the proposal than we would have for 447 00:37:28,720 --> 00:37:35,680 for any other type of land use change within the city 448 00:37:33,040 --> 00:37:39,440 » and the lovely property owners. >> That is correct under the current code. 449 00:37:37,520 --> 00:37:43,760 But if there's feedback on that, that is certainly feedback that that we would uh 450 00:37:41,760 --> 00:37:46,800 like to receive from you as well. >> You mean renters don't get notified 451 00:37:45,599 --> 00:37:50,800 under the current code? >> They do not. That is correct. 452 00:37:48,320 --> 00:37:54,560 » So they would not be notified under this code. the the property owner would be 453 00:37:53,359 --> 00:37:59,040 notified and the neighborhood associations would be notified and they 454 00:37:56,960 --> 00:38:02,720 would have the opportunity to notify their tenants or not. But that is how 455 00:38:01,040 --> 00:38:06,400 the code is currently structured. >> What about the schools? 456 00:38:04,480 --> 00:38:10,920 » Schools are property within the notification area and they would be 457 00:38:07,920 --> 00:38:10,920 notified. 458 00:38:16,480 --> 00:38:24,240 So the next slide before we get to the survey is the proposed procedure for 459 00:38:21,920 --> 00:38:28,720 data center review. This is something I've already talked about, but I just 460 00:38:25,920 --> 00:38:32,400 want to lay it out in a uh diagram because I know it's it's a complex 461 00:38:30,560 --> 00:38:38,400 process and there are a lot of steps and steps sound similar. So I can certainly 462 00:38:34,960 --> 00:38:41,680 appreciate um trying to to really wrap your head around what all those steps 463 00:38:40,079 --> 00:38:46,560 are. But the first one is the neighborhood meeting and that is the 464 00:38:43,440 --> 00:38:50,480 public meeting where the developer of the proposal would meet with the public 465 00:38:48,800 --> 00:38:54,640 to provide property owners and neighborhood associations and anyone 466 00:38:52,480 --> 00:39:01,680 else who comes to the meeting with feedback on the proposal. Uh from there 467 00:38:58,560 --> 00:39:08,000 an applicant would uh meet with city staff and then submit an application. 468 00:39:05,119 --> 00:39:13,680 Um there would be again public notice of a zoning examiner public hearing that is 469 00:39:10,640 --> 00:39:19,119 fully public notice and a public hearing would occur with our zoning examiner who 470 00:39:16,000 --> 00:39:24,240 is a again a quasi judicial person who reviews zoning cases and then makes 471 00:39:21,200 --> 00:39:27,680 recommendations to mayor and counsel. Zoning examiner would make that 472 00:39:25,599 --> 00:39:33,119 recommendation and then mayor and counsel would consider the proposal. 473 00:39:30,400 --> 00:39:38,000 Mayor and council could approve, deny, or modify a proposal based on feedback 474 00:39:36,320 --> 00:39:42,800 received. >> Is any of this required to be bilingual 475 00:39:40,560 --> 00:39:48,960 or interpreted through ASL? >> Certainly any ADA compliance would would 476 00:39:45,440 --> 00:39:53,520 be met and um certainly bilingual translation is available just like it is 477 00:39:50,880 --> 00:39:56,720 through all other city processes. >> Is the neighborhood meeting required to 478 00:39:55,280 --> 00:40:00,800 be in person? in the neighborhood meeting for project blue with just two 479 00:39:58,800 --> 00:40:04,560 people from the county, one person from the state, and a lawyer for project blue 480 00:40:02,960 --> 00:40:09,280 because that's the only people who are living anywhere near the area. 481 00:40:07,920 --> 00:40:12,240 » I really don't know about the neighborhood meeting that took place for 482 00:40:10,800 --> 00:40:17,760 project blue because it was in the county and so it was not a city process 483 00:40:15,119 --> 00:40:23,040 that was followed. But that really speaks to our intention to expand the 484 00:40:20,320 --> 00:40:27,520 notice area in the proposal for exactly that reason because if there's nobody 485 00:40:24,960 --> 00:40:32,760 that lives within the area, we want to notice a larger area to ensure that. 486 00:40:33,680 --> 00:40:44,079 Okay. Um so the next slide is back to the survey. If you'd like to provide 487 00:40:41,839 --> 00:40:49,599 feedback on the next section of questions, these relate specifically to 488 00:40:47,680 --> 00:40:56,960 the definition of large scale data centers and our notice requirements. And 489 00:40:52,480 --> 00:41:01,040 I can come back to the definition slide for a minute or so if people would like 490 00:40:58,880 --> 00:41:06,079 to review that again and provide any feedback whether you believe this 491 00:41:03,200 --> 00:41:10,560 definition um essentially goes far enough or needs to go further. And if 492 00:41:08,160 --> 00:41:16,920 you have any written feedback on this definition, uh that will certainly help 493 00:41:12,800 --> 00:41:16,920 us to receive that as well. 494 00:41:32,880 --> 00:41:38,680 » Oh, certainly. Yeah. Hold on. Here we go. 495 00:41:39,760 --> 00:41:45,680 Have you considered expanding the notification 496 00:41:43,280 --> 00:41:51,040 range because the sound profile of data centers is so much different and and 497 00:41:48,720 --> 00:41:54,960 propagates so much farther especially in this particular climate to capture more 498 00:41:53,680 --> 00:41:58,000 people that are affected. >> I think that's certainly something that 499 00:41:56,319 --> 00:42:04,160 we consider and I would encourage you to place that in the comments as well if if 500 00:42:00,319 --> 00:42:04,160 you believe that that is important. 501 00:42:04,240 --> 00:42:11,280 Back to your definition of large scale, have you considered putting an upper 502 00:42:09,599 --> 00:42:17,680 limit to this definition? So then you know we 503 00:42:14,240 --> 00:42:20,640 don't have a medium acre data center. I 504 00:42:19,119 --> 00:42:27,560 » think that's something again please provide feedback on that that will be 505 00:42:22,720 --> 00:42:27,560 very helpful for us to receive as well. 506 00:42:32,640 --> 00:42:35,640 Okay. 507 00:42:36,560 --> 00:42:46,480 » So, the next question really goes back to the the process for allowed zones and 508 00:42:43,119 --> 00:42:51,200 also the review process. Uh, so we certainly ask for feedback on the review 509 00:42:48,319 --> 00:42:56,319 process of the proposal of notifying to half an half a mile property owners as 510 00:42:53,680 --> 00:43:00,079 well as two miles to neighborhood associations. Do you feel that's 511 00:42:58,400 --> 00:43:05,920 adequate? If you have any other feedback to provide um please write it in the 512 00:43:02,960 --> 00:43:09,880 survey or on the sheet um so that we can document that as well. 513 00:43:18,000 --> 00:43:25,839 » Certainly >> go back to the one where it says 50,000 514 00:43:22,800 --> 00:43:30,319 square feet. So if they build something 49,000 square feet, they don't have to 515 00:43:28,319 --> 00:43:33,599 go through this process. >> That would be correct. It wouldn't meet 516 00:43:31,760 --> 00:43:38,240 the definition of a large scale data center, but that's part of the reason 517 00:43:35,599 --> 00:43:44,440 why we are looking at 50,000 square feet and we weren't looking at 100,000 square 518 00:43:40,000 --> 00:43:44,440 feet or something like that because 519 00:43:44,560 --> 00:43:50,560 » we we certainly looked at that as well and and there there are challenges from 520 00:43:48,560 --> 00:43:56,640 a zoning standpoint of regulating that, but please provide that feedback as 521 00:43:52,560 --> 00:44:00,640 well. Oh, we will >> again and again and again. 522 00:43:59,040 --> 00:44:04,160 » Are answers to the survey going to be made public? 523 00:44:01,680 --> 00:44:08,400 » Yes, they will all be posted online on the PDSD website, provided to mayor and 524 00:44:06,800 --> 00:44:15,119 council and provided to the planning commission. 525 00:44:11,119 --> 00:44:21,119 » So, the input that we provide, questions and clarification that are requested, we 526 00:44:18,480 --> 00:44:27,520 indicated that a committee or a group are going to compile it to the convey it 527 00:44:24,400 --> 00:44:37,280 to the mayor. Is there going to be any representation from someone outside of 528 00:44:32,560 --> 00:44:42,319 the city um group included in conveying that? Because there could be a conflict 529 00:44:39,839 --> 00:44:48,000 of interest. Um we don't really have representation as to how the data is 530 00:44:44,960 --> 00:44:52,319 manipulated or conveyed. So actual verbatim comments for 531 00:44:50,480 --> 00:44:58,079 everything that we received will be conveyed. We may provide an overview of 532 00:44:55,440 --> 00:45:03,040 the number of comments received or even categories but the actual if you will 533 00:45:00,720 --> 00:45:07,200 metadata of every single specific comment that we receive whether it's 534 00:45:05,280 --> 00:45:11,680 through the survey through comments in the registration through post-it notes 535 00:45:09,599 --> 00:45:16,720 that were posted out in the lobby through chat comments that we've 536 00:45:13,440 --> 00:45:22,079 received from the online meetings. Um, it's any other comments that we receive, 537 00:45:18,960 --> 00:45:27,960 emails, those will all be provided to mayor and council in a single document 538 00:45:23,920 --> 00:45:27,960 as well as the planning commission. 539 00:45:34,079 --> 00:45:41,359 People uh have an opportunity to answer the survey questions specific to this. 540 00:45:39,599 --> 00:45:45,680 I do want to say also that the survey will be left open for some time. So, if 541 00:45:44,240 --> 00:45:50,599 you don't get it tonight, you can come back and provide additional feedback as 542 00:45:47,599 --> 00:45:50,599 well. 543 00:45:52,160 --> 00:45:59,960 » Yeah. At this point, I'm going to turn it over to Dan Versk, who's going to 544 00:45:55,200 --> 00:45:59,960 talk about energy and water use. 545 00:46:07,040 --> 00:46:13,119 » Great. Um, thank you, Carver. Thank you everyone for joining us today. Really 546 00:46:11,760 --> 00:46:17,680 appreciate it. I do want to point out one quick thing um that might make it a 547 00:46:16,400 --> 00:46:23,520 little easier for people who are following along using the QR codes. So 548 00:46:19,920 --> 00:46:28,079 this QR code goes to uh the survey, but it's the same QR code every single time. 549 00:46:25,920 --> 00:46:33,119 So if you keep that page open, you're able to kind of follow along. So you can 550 00:46:30,560 --> 00:46:37,920 potentially if I go to the next slide, you could put it in your comments as I'm 551 00:46:35,040 --> 00:46:41,839 speaking. Um, and it'll keep you keep us from having to jump back and forth and 552 00:46:39,920 --> 00:46:46,720 having to remember kind of what we're going going over the specifics of it. 553 00:46:44,079 --> 00:46:52,000 So, just a little tip. Um, might help with some of the logistics of the 554 00:46:49,119 --> 00:46:56,480 survey. Um, but as well you also have the opportunity for the the written ones 555 00:46:54,800 --> 00:47:03,280 which is exactly the same. >> Excellent. Great. So, um, wanted to talk 556 00:46:59,599 --> 00:47:08,640 a little bit about energy and water. Um as uh Corin and Carvin Carver had 557 00:47:05,920 --> 00:47:14,560 mentioned earlier um these are two items that um zoning really um is very limited 558 00:47:11,920 --> 00:47:17,520 in what um can be regulated through these which is part of the reason why 559 00:47:16,400 --> 00:47:22,160 you know we're looking at things like the large water uh large quantity water 560 00:47:19,599 --> 00:47:25,920 use ordinance and other methods in order to really try to address these things as 561 00:47:24,079 --> 00:47:31,440 we know they are very important to the community and very important to to the 562 00:47:27,599 --> 00:47:38,400 city of Tucson. And so um related to energy consumption and sourcing um we do 563 00:47:34,800 --> 00:47:41,599 have um some regulations and things that we are proposing related to this. We 564 00:47:40,319 --> 00:47:47,599 definitely want to get your feedback on this. Um, but the idea here is to 565 00:47:44,880 --> 00:47:51,839 provide information, public information that would be part of the application, 566 00:47:49,920 --> 00:47:56,000 part of the materials that make its way through through the review and to mayor 567 00:47:53,760 --> 00:48:00,560 and counsel so our mayor and council can make really the best decision possible 568 00:47:58,800 --> 00:48:06,079 and have all the information that they need in front of them. And so the idea 569 00:48:02,960 --> 00:48:09,119 here is that every applicant that if they were to come in, there are no 570 00:48:07,520 --> 00:48:14,880 applicants that have currently come in that are in um but demonstrate access to 571 00:48:12,640 --> 00:48:20,079 adequate energy supply at the time of the application. And so they have to 572 00:48:16,720 --> 00:48:24,640 show that through disclosure um that they have adequate energy um supply at 573 00:48:22,960 --> 00:48:27,839 the time of application. It's not something to where there is an adequate 574 00:48:26,240 --> 00:48:31,440 supply and then all of a sudden infrastructure has to be created leading 575 00:48:29,760 --> 00:48:37,440 to rate increases and things of that sort. Additionally, um the applicant 576 00:48:34,400 --> 00:48:41,440 must disclose proposed amount of energy, energy mix including renewables and 577 00:48:39,680 --> 00:48:45,040 application materials related to this. So again, you're providing all of that 578 00:48:43,359 --> 00:48:48,960 information so you can make that decision. Um again, mayor and council, 579 00:48:47,520 --> 00:48:53,599 this is part of their decision-m process. Um they don't have to approve 580 00:48:51,520 --> 00:48:58,000 this. They can approve this, deny this. they could uh ask for additional 581 00:48:55,200 --> 00:49:02,400 conditions uh related to that based off that information. So again, putting the 582 00:49:00,319 --> 00:49:07,200 information in front of the public and front in front of our mayor council so 583 00:49:04,000 --> 00:49:12,480 they can make that decision. Um related to kind of water use um we have a little 584 00:49:09,920 --> 00:49:17,280 more leeway on this one um as far as what we can regulate and what we can do. 585 00:49:14,800 --> 00:49:24,160 Um but it's just not necessarily within zoning. Um, so what pretty much anything 586 00:49:22,240 --> 00:49:28,160 that any applicant that comes in must comply with the city's large quantity 587 00:49:25,760 --> 00:49:32,160 water user ordinance um if a Tucson water um customer and Scott had talked a 588 00:49:30,880 --> 00:49:37,119 little bit about this earlier, but it requires a water conservation plan. Um 589 00:49:34,480 --> 00:49:41,440 recycling water requirements impossible um and really require it and requires 590 00:49:38,880 --> 00:49:46,400 monitoring and compliance. um if they don't comply with it, there are um 591 00:49:44,000 --> 00:49:53,599 pretty steep penalties um as far as related to this um and and 592 00:49:50,400 --> 00:50:00,319 and for that. Um so if they don't fall within that however um which would be 593 00:49:56,800 --> 00:50:07,119 that 10,000 CFS that's got talked about um they would be um required or actually 594 00:50:04,000 --> 00:50:11,280 we would it'd be required to meet that the the the standard that is basically 595 00:50:09,520 --> 00:50:15,280 prohibiting the use of portable water. So they wouldn't be able to utilize 596 00:50:12,720 --> 00:50:19,280 portable water for data center cooling um if they weren't subject to the large 597 00:50:17,440 --> 00:50:24,160 quantity water use ordinance. Additionally to this um similar to the 598 00:50:21,839 --> 00:50:28,720 energy um they would be required to demonstrate access to water supply at 599 00:50:26,720 --> 00:50:32,319 the time of application as well. So yeah bringing all that information making 600 00:50:30,640 --> 00:50:36,000 sure that all that information makes it in front of mayor and council so they 601 00:50:33,520 --> 00:50:38,800 can make um a decision and understand kind of what's in front of them. All 602 00:50:37,440 --> 00:50:42,240 that information would be public. It would be submitted at the time of 603 00:50:40,160 --> 00:50:44,960 application early on in the process. So it's available to the public. It's 604 00:50:43,599 --> 00:50:48,160 available to the zoning examiners. It's available to staff. It's available to 605 00:50:46,160 --> 00:50:54,160 everyone. Um, we have a couple questions. I'm 606 00:50:50,160 --> 00:50:58,000 going to hold up for a second. Um, hopefully. Yes. 607 00:50:55,440 --> 00:51:05,599 » Will there be a requirement that they have some percentage of renewables 608 00:51:01,839 --> 00:51:13,599 or recycled water usage? >> Um, so there it's a great comment and a 609 00:51:10,480 --> 00:51:17,359 good one to submit and let us know. Um, as of now in the proposal, there are not 610 00:51:15,920 --> 00:51:21,839 a requirement for a percentage of renewable or or a percentage necessarily 611 00:51:19,520 --> 00:51:25,520 of recycled water. Um, they aren't allowed to use utilize portable water. 612 00:51:23,760 --> 00:51:28,880 Um, if they're under that and then that would be probably part of the water 613 00:51:27,040 --> 00:51:31,359 conservation plan if they were to do a large quantity of water user ordinance, 614 00:51:30,720 --> 00:51:34,559 right? >> Why not? 615 00:51:33,040 --> 00:51:37,920 » Um, >> that is that is why we are in front of 616 00:51:36,000 --> 00:51:41,119 you to get feedback related to that. So, that's that that is helpful. We 617 00:51:39,359 --> 00:51:43,839 appreciate it. Um, 618 00:51:41,920 --> 00:51:49,359 » you mentioned state penalties. Could you elaborate on that? How big of 619 00:51:47,760 --> 00:51:54,319 a second? 620 00:51:50,720 --> 00:51:58,319 » Um, related to that, I and and Scott and Chris. 621 00:51:57,040 --> 00:52:01,440 You know what we'll do? We'll look it up and then when we're doing Q&A, I'll make 622 00:51:59,920 --> 00:52:06,319 sure that we respond to that. Um, and make sure that, you know, it's it's 623 00:52:02,880 --> 00:52:09,520 pretty steep and it gets it multiplies as you have more less and less 624 00:52:08,160 --> 00:52:12,400 compliance over time. I can get those numbers 625 00:52:10,319 --> 00:52:15,359 » dollars. How are you going to They just cut you a check. How you going to How 626 00:52:14,160 --> 00:52:17,920 you going to counter that when somebody has millions of dollars will just be 627 00:52:16,880 --> 00:52:22,559 cutting your check? It's already happening across the country. 628 00:52:20,640 --> 00:52:27,119 » Anyway, so um I'm going to have to move on, but we will have Hold on one second. 629 00:52:24,160 --> 00:52:31,680 I'm going to I will let >> Chris will come up and talk real quickly 630 00:52:28,720 --> 00:52:34,000 about this because he has the details related to it and then then we'll have 631 00:52:33,359 --> 00:52:39,040 to move on. >> Just to clarify, if they're using more 632 00:52:36,400 --> 00:52:44,319 than 7.8 million gallons per month since they can use more portable water. 633 00:52:41,920 --> 00:52:51,720 » Um, it would be a part of their water conservation plan. In general, they have 634 00:52:46,800 --> 00:52:51,720 to offset all of that water use, but 635 00:52:52,720 --> 00:52:58,960 » my name is Chris Ary. I work at the Tucson City Attorney's Office. I'm going 636 00:52:56,480 --> 00:53:03,040 to answer the question about water use penalties in the large quantity water 637 00:53:01,280 --> 00:53:09,280 user ordinance that's been adopted by mayor council. There are of course some 638 00:53:06,800 --> 00:53:14,160 u financial penalties that occurred to folks who violate the slaughter 639 00:53:11,760 --> 00:53:18,079 conservation plan that they submit as part of the large quantity water user 640 00:53:15,760 --> 00:53:24,319 ordinance. But at the end stage of that there is the ability of the city to um 641 00:53:21,520 --> 00:53:29,520 enact flow restrictions or to restrict the water use manually and there's no 642 00:53:26,720 --> 00:53:34,800 amount of money that can um stop that. So I just want to point that out. Um, as 643 00:53:32,319 --> 00:53:39,760 far as offsets, again, what we're asking for in the large quantity water user 644 00:53:37,599 --> 00:53:45,040 ordinance is for applicants to demonstrate the most efficient use of 645 00:53:41,680 --> 00:53:52,079 water for the technology that they have and to also site their uh facilities in 646 00:53:49,760 --> 00:53:56,640 areas where there's proximity to reclaimed water if possible and to use 647 00:53:54,000 --> 00:53:59,680 as much reclaimed water as they can. Um, there are different perspectives about 648 00:53:58,160 --> 00:54:03,760 that and we'd love to hear your comments about whether you think 649 00:54:02,079 --> 00:54:07,920 these large facilities should use portable water or reclaim water or both. 650 00:54:06,240 --> 00:54:11,512 » Can you tell us where that valve is? We won't tell anyone. You told us 651 00:54:09,492 --> 00:54:11,512 [laughter] 652 00:54:12,720 --> 00:54:17,960 » which I did not understand that question. 653 00:54:18,480 --> 00:54:24,960 » Who gets to decide when the water gets shut off if a large water user goes too 654 00:54:23,440 --> 00:54:29,920 far? So the the language in the large 655 00:54:27,680 --> 00:54:34,000 quantity water user ordinance doesn't talk about shut offs. It talks about 656 00:54:31,760 --> 00:54:38,880 flow restrictions. So they ask a large quantity water user will be submitting a 657 00:54:36,000 --> 00:54:44,240 water use plan and if that plan is not met then we will meter the usage so that 658 00:54:42,240 --> 00:54:48,319 it complies with that plan. >> Who determines how much reclaimed water 659 00:54:46,000 --> 00:54:52,640 they should be using? Who decides what what's the best? There are a set of 660 00:54:50,640 --> 00:54:57,280 recommendations that are made on that in that respect by the city of Tucson water 661 00:54:55,599 --> 00:55:00,640 department director and some of that is related to proximity to the reclaim 662 00:54:59,200 --> 00:55:04,040 system but ultimately it's a mayor council decision. 663 00:55:07,200 --> 00:55:12,880 » Great. Thank you Chris. I appreciate it. Okay. Um moving on and we will have Q&A 664 00:55:11,440 --> 00:55:16,880 at the end. Just want to let everyone know um where we'll have the opportunity 665 00:55:14,640 --> 00:55:22,079 to be able to uh provide comments, ask questions, etc. 666 00:55:18,880 --> 00:55:25,440 Um so talk a little bit about proposed setbacks and this is something we've 667 00:55:23,520 --> 00:55:29,599 gotten a lot of feedback on so far and we do really appreciate a lot of the 668 00:55:27,280 --> 00:55:33,760 feedback um especially related to kind of noise impacts and things of that 669 00:55:31,040 --> 00:55:38,400 sort. So um in the proposal that is in front of you the one we've that we've 670 00:55:35,599 --> 00:55:43,920 that we've put in front of you um we have a required 400t setback from data 671 00:55:41,280 --> 00:55:50,240 center use uh to urban residential areas and noise sensitive uh areas such as 672 00:55:46,240 --> 00:55:56,240 schools. Um and additionally we have uh a required 200 foot setback um from data 673 00:55:54,160 --> 00:56:00,480 center use to commercial or office use is just understanding that the 674 00:55:58,319 --> 00:56:04,480 incompatibility of these of these facilities um really related to 675 00:56:03,040 --> 00:56:09,040 commercial or related to office especially related to residential um is 676 00:56:06,880 --> 00:56:12,559 not there and so this is intended to make sure that it's set back. We've 677 00:56:10,559 --> 00:56:17,680 seen, you know, a lot of situations up in um the Phoenix area where they didn't 678 00:56:14,640 --> 00:56:20,720 have regulations in place um for this and we have data centers right across 679 00:56:19,359 --> 00:56:24,799 the street from a lot of residential neighborhoods. Um they've measured you 680 00:56:23,119 --> 00:56:29,599 know heat impacts and noise impacts and things of that sort and this is really 681 00:56:26,319 --> 00:56:34,240 intended to um to mitigate some of that. Um we've had we've had several comments 682 00:56:31,599 --> 00:56:37,839 related to uh you know whether this is enough or not. Um we do really 683 00:56:36,319 --> 00:56:42,319 appreciate that. It's something we will be looking at. um as far as looking at 684 00:56:40,079 --> 00:56:48,400 potential revisions to um as we move forward um with this proposal. Um so 685 00:56:45,359 --> 00:56:53,359 that that's the current proposal um uh that we have kind of in front of you um 686 00:56:50,799 --> 00:56:57,599 related to proposed setbacks um as well for this 687 00:56:55,359 --> 00:57:01,680 um related to that uh there is a question in there related to that 688 00:56:58,960 --> 00:57:06,559 whether it's um appropriate or not um as well as you know open-ended question to 689 00:57:04,319 --> 00:57:11,040 be able to provide your comments. Huh? >> Two questions. How come the slide 690 00:57:09,040 --> 00:57:16,160 doesn't have the same amount of stuff on it as the sheet? The sheet has two more 691 00:57:13,680 --> 00:57:21,240 items, landscaping. >> Oh, yeah. We're uh we'll be talking 692 00:57:17,599 --> 00:57:21,240 about that in a second. 693 00:57:21,440 --> 00:57:26,960 » We're already within the times for community questions. It's 7:30. 694 00:57:24,799 --> 00:57:32,160 » Yeah, we're we we're almost there. Okay, we'll be there. Okay. No, we 695 00:57:29,359 --> 00:57:36,799 » How come the notification thing is is so large, but that setback is only 400 ft? 696 00:57:35,200 --> 00:57:39,599 I mean, that's nothing. >> Nothing. 697 00:57:37,680 --> 00:57:43,880 » That's so tiny. That's not a quarter of a mile. 698 00:57:40,880 --> 00:57:43,880 » Yeah. 699 00:57:44,000 --> 00:57:51,960 » Good things to comment on. We will take your feedback related, but we are 700 00:57:47,680 --> 00:57:51,960 looking at it. So, we appreciate it. 701 00:57:56,000 --> 00:58:03,280 » I'll let you know. Okay. A couple of other things that zoning can regulate. 702 00:58:00,240 --> 00:58:06,720 Uh, one of them being um noise. >> What's your name? 703 00:58:04,160 --> 00:58:12,799 » Regulation. My name is Nick Martell. >> Thank you. Um, so our proposal right now 704 00:58:09,760 --> 00:58:16,720 is to require a independent noise study that measures sound levels and tone. Um, 705 00:58:15,040 --> 00:58:22,480 that's something that would be in that 5565 decel area when it reaches a 706 00:58:19,839 --> 00:58:27,280 property line. So on the outside or the actual property line between um the 707 00:58:24,799 --> 00:58:31,280 proposed data center and any other land use. Um the other thing would be to set 708 00:58:29,520 --> 00:58:36,160 clear noise limits on that property line like I just said with those decibb um 709 00:58:33,680 --> 00:58:41,040 and then require sound walls or roof screening around generators um and then 710 00:58:39,359 --> 00:58:46,559 other loud equipment. So that's just to kind of uh a to block some of the uh the 711 00:58:44,799 --> 00:58:51,760 uh generators and some of those other visual aspects of it and also to block 712 00:58:48,480 --> 00:58:51,760 some sound. 713 00:58:53,680 --> 00:59:02,000 Is there any accommodation on that on the decel level for duration? Because 714 00:58:58,079 --> 00:59:06,880 even though it's 50 dB, 50 dB at a constant 247 715 00:59:04,240 --> 00:59:09,760 pace has a different effect than just checking for a single. 716 00:59:08,400 --> 00:59:12,799 » So I believe that would be covered in the sound study that would be required 717 00:59:11,520 --> 00:59:18,880 for this. >> What what waiting scale are you using to 718 00:59:16,160 --> 00:59:25,960 the sound? a waiting specifically derates the sal of these facilities. 719 00:59:21,680 --> 00:59:25,960 » I'd have to get back to you on that one. 720 00:59:26,079 --> 00:59:33,119 » Okay. Uh some proposed regulations for generator use. Um so generators are part 721 00:59:30,720 --> 00:59:38,079 of data centers in terms of backup power usually. Um so our proposal would be to 722 00:59:35,839 --> 00:59:44,000 use cleaner high efficiency generators such as tier 4 or natural gas or dual 723 00:59:40,799 --> 00:59:48,000 fuel. Um battery backups would be used first during power disruptions. So if 724 00:59:46,160 --> 00:59:52,160 there were a power disruption to use that backup uh battery first before 725 00:59:50,160 --> 00:59:56,319 getting into generators. Um there would be no load shifting allowed which is the 726 00:59:54,400 --> 01:00:01,680 uh running of generators instead of using grid power. Um and then generators 727 00:59:59,200 --> 01:00:06,160 run only during emergencies or required maintenance. Um and then that would be 728 01:00:03,839 --> 01:00:12,640 non-emergency uh maintenance would only be limited to 9 to5s on weekdays. 729 01:00:09,599 --> 01:00:16,400 » Who's going to regulate that and and how do you file complaints if they're not in 730 01:00:14,480 --> 01:00:20,000 compliance? So this would be regulated through our code enforcement. Uh code 731 01:00:18,400 --> 01:00:23,680 enforcement, you have a website, you can use um 311. There's several ways you can 732 01:00:22,559 --> 01:00:29,319 call code enforcement. >> Who monitors the load? 733 01:00:26,319 --> 01:00:29,319 » Sorry. 734 01:00:30,240 --> 01:00:35,839 » Um that would just be a regulation and if they were out of code with it, then 735 01:00:33,760 --> 01:00:38,400 they could be issued a violation. >> How would anybody know they were out of 736 01:00:37,280 --> 01:00:41,520 code? >> That would be up to our code enforcement 737 01:00:39,920 --> 01:00:46,640 department to enforce. >> Teen will take care of that. 738 01:00:43,359 --> 01:00:53,280 » All right. I will leave this up for one minute um just in case nobody got it and 739 01:00:49,440 --> 01:00:56,480 then I'll move on just a second. >> I'm going to go back to the compliance 740 01:00:54,640 --> 01:01:00,640 thing again. These guys have billions of dollars. So what are you going to do 741 01:00:58,400 --> 01:01:04,079 when they just keep cutting you a check and they keep violating stuff? You going 742 01:01:02,799 --> 01:01:07,440 to shut them off? You going to tell them to get the hell out? You can't do 743 01:01:05,760 --> 01:01:11,119 anything. You don't have the money against these companies. Why are you 744 01:01:09,520 --> 01:01:16,079 guys not thinking about this? >> Thank you for that feedback. that stuff 745 01:01:12,720 --> 01:01:21,280 we would love to hear. Okay, moving on to proposed landscaping. 746 01:01:18,720 --> 01:01:25,200 Um so one of the proposed landscape um items here would be to require an 747 01:01:22,880 --> 01:01:29,359 enhanced landscaping border of 20 ft. Um that would be around the property line 748 01:01:26,960 --> 01:01:34,559 that helps eliminate some visual aspects of these data centers. It also um 749 01:01:31,599 --> 01:01:40,559 provides areas to provide um low water plants um uh desert plants for desert 750 01:01:38,640 --> 01:01:44,079 landscaping. Um and then to define a minimum parking ratio. That's also one 751 01:01:42,160 --> 01:01:47,920 of the aspects of zoning. Um a lot of these do not require a lot of parking 752 01:01:46,000 --> 01:01:52,720 and so we would not be requiring a lot of parking for them to use it. Um kind 753 01:01:50,240 --> 01:01:58,920 of limiting imperous surfaces at data centers. 754 01:01:55,200 --> 01:01:58,920 » So there are no jobs. 755 01:01:59,760 --> 01:02:05,440 » Cool. Thanks. >> Okay. Environmental compatibility. So we 756 01:02:04,240 --> 01:02:09,359 are going to utilize some of our existing standards. Uh we are not 757 01:02:07,359 --> 01:02:13,280 proposing any changes to environmental compatibility. Uh we would require 758 01:02:11,440 --> 01:02:18,079 applicants to adhere to any overlays such as the environmental resource zone 759 01:02:16,079 --> 01:02:21,520 um the wash overlays the water course amenity safety and habitat zones. They 760 01:02:20,240 --> 01:02:27,160 would have to utilize commercial rainwater harvesting and hillside 761 01:02:23,680 --> 01:02:27,160 development standards. 762 01:02:27,520 --> 01:02:34,720 This includes protection of existing aoyos and washes. Uh the use of low 763 01:02:32,079 --> 01:02:40,400 water and drought tolerant plants. Uh as well as a requirement of harvesting 50% 764 01:02:37,520 --> 01:02:43,520 of total landscape water demands. Um just then touching on some of those uh 765 01:02:42,160 --> 01:02:48,720 desert landscapes that I was talking about. Um and then utilizing an existing 766 01:02:45,839 --> 01:02:52,480 airport hazard district uh requirements on glare. A lot of our I2 zones are 767 01:02:51,200 --> 01:02:56,880 pretty close to the airport. So they would have to comply with all airport 768 01:02:54,079 --> 01:03:02,799 environment zone uh requirements. >> Okay. On that last point, what where 769 01:02:59,920 --> 01:03:05,839 would I find Can you go back? >> Uh where would I find those standards? 770 01:03:04,559 --> 01:03:08,880 The state standards. >> These are in our unified development 771 01:03:07,440 --> 01:03:12,880 code. These would be in the overlay section of the UDC. Um if you would 772 01:03:11,280 --> 01:03:16,920 like, I can talk to you afterward and show you if you'd like to see them. 773 01:03:17,760 --> 01:03:23,680 » Okay. Um going to give you another minute if you would like to put any 774 01:03:21,680 --> 01:03:26,303 feedback in for those landscape parking and compatibility. [clears throat] 775 01:03:36,079 --> 01:03:41,559 » Then no need to go back to the good 776 01:03:52,880 --> 01:03:58,720 All right, we just have a couple more slides before we can get to the question 777 01:03:56,160 --> 01:04:03,920 and answer comment section. U just wanted to emphasize I already covered 778 01:04:01,520 --> 01:04:09,680 some of this opportunities for further input and discussion. This QR code is 779 01:04:06,799 --> 01:04:14,240 for the PDSD website where information is going is all posted. Uh, as I 780 01:04:12,400 --> 01:04:19,680 mentioned earlier, we're looking at probably a mayor and council special or 781 01:04:16,160 --> 01:04:23,039 a study session in April and then to be determined on planning commission study 782 01:04:21,599 --> 01:04:30,240 session, planning commission public hearing and merit council consideration. 783 01:04:26,319 --> 01:04:36,720 Uh, we also have a um FAQ document that we are continuing to 784 01:04:33,520 --> 01:04:41,920 update and it's posted to the website. Uh, this is again the process uh that we 785 01:04:39,680 --> 01:04:47,920 outlined earlier. you've already seen that. Um, and so now we're getting set 786 01:04:44,880 --> 01:04:52,319 up for the Q&A section. Uh, microphone is being set up by Cesar. Uh, please 787 01:04:50,079 --> 01:04:57,119 line up behind the microphone to speak. Uh, we ask that you please be succinct 788 01:04:54,480 --> 01:05:02,240 and speak for no more than 60 seconds so that we can ensure that everybody has an 789 01:04:58,960 --> 01:05:08,079 opportunity to speak wishes to. And your questions during this Q&A uh, session 790 01:05:05,280 --> 01:05:12,480 will be included on the record of public input. um these are being filmed and 791 01:05:10,319 --> 01:05:17,400 these will be documented and sent to parent council and the planning 792 01:05:13,920 --> 01:05:17,400 commission as well. 793 01:05:17,920 --> 01:05:24,640 » Okay, great. So, we have about 20 minutes for Q&A. Again, no more than 60 794 01:05:22,880 --> 01:05:28,240 seconds. We want everybody to have a chance their chance to to ask questions 795 01:05:26,799 --> 01:05:31,720 or speak. >> Can you give us 796 01:05:32,400 --> 01:05:41,280 » the full 30 minutes? >> Well, spoke pretty slow. So, 797 01:05:38,480 --> 01:05:46,880 So, um, Colleen is holding going to hold up cards to remind you of your seconds. 798 01:05:44,400 --> 01:05:50,319 Um, we know that in public hearings, you get three minutes. This is one minute 799 01:05:48,640 --> 01:05:56,240 because this is not a public hearing and we want more people that have a chance. 800 01:05:52,559 --> 01:06:00,400 So, um, and Cesar will be making sure that you also know when it's time to 801 01:05:58,640 --> 01:06:03,920 stop, but we really value your comments. So, go ahead. First, let's hopefully the 802 01:06:02,720 --> 01:06:07,839 mic is working. >> Yes. Hi. Uh, my name is Vake. I'm a 803 01:06:06,480 --> 01:06:12,079 member of the no desert data center coalition um can you bring up the slide 804 01:06:10,000 --> 01:06:17,520 of the map please with the with the I2 zones. Um and while that's happening um 805 01:06:15,359 --> 01:06:21,839 I encourage everyone here to leave comments that say prohibit large scale 806 01:06:20,480 --> 01:06:25,599 data centers. I think we've heard tonight that whatever restrictions there 807 01:06:23,520 --> 01:06:30,400 are incredibly hard to enforce if at all. Um and so please do say just 808 01:06:28,559 --> 01:06:35,039 prohibit large scale data centers. It's not up to us to explain how to do that 809 01:06:32,880 --> 01:06:39,920 legally. It's up to our city staff to figure that out. Um so if you do know 810 01:06:37,760 --> 01:06:45,280 that though, please let them know. Um so this map, the purple area is the large 811 01:06:42,079 --> 01:06:48,640 is the um heavy industrial area to the south of the airport. If you see that 812 01:06:46,960 --> 01:06:52,960 little carve out south of that purple area, that's Summit. They have no uh 813 01:06:51,280 --> 01:06:57,760 representation in the city of Tucson, but they are 80% Latin. And they border 814 01:06:55,839 --> 01:07:01,599 the largest section of industrial, heavy industrial. You can see the western 815 01:06:59,200 --> 01:07:06,480 border there is the San Javier district of the Kona nation. So these are folks 816 01:07:04,000 --> 01:07:09,280 who are disenfranchised by these data centers and that's the heaviest 817 01:07:07,839 --> 01:07:12,920 concentration right there. This is environmental racism. 818 01:07:15,280 --> 01:07:20,720 So hi, my name is L. I'm here to represent myself as a geoccientist from 819 01:07:18,720 --> 01:07:25,440 the University of Arizona and I'm also here as a member of Tucson Red Action. 820 01:07:23,200 --> 01:07:28,720 Uh our group has made a list of demands and I'm just going to go over that real 821 01:07:26,799 --> 01:07:33,920 quick. Our first one, a complete dedication to the not one drop policy. 822 01:07:31,039 --> 01:07:38,480 This includes uh water and it's been amended to be an airbased project. We 823 01:07:36,400 --> 01:07:44,960 want to include that also all natural resources including petroleum, gas uh 824 01:07:41,359 --> 01:07:51,599 etc. Um our second demand uh we want a commitment to the prohibition of any 825 01:07:48,559 --> 01:07:56,079 data center. Um we demand that the city at every stage if you have spoken that 826 01:07:54,079 --> 01:08:02,559 you are only able to control this from a building code standpoint. Um all the 827 01:07:59,119 --> 01:08:06,720 other groups um need to work with you to make sure that no data center can be 828 01:08:04,480 --> 01:08:12,799 made. Uh and most importantly we want a seat at the table. Uh this TAC board 829 01:08:09,760 --> 01:08:17,040 lacks proper representation by the people who will be affected most. We 830 01:08:14,720 --> 01:08:22,480 want energy experts, water experts from nonprivate, non um for-profit 831 01:08:20,319 --> 01:08:27,040 organizations along with gender and racial tribal voices. 832 01:08:24,880 --> 01:08:31,839 » Great. >> And I'll just like if you have written 833 01:08:29,839 --> 01:08:36,679 comments for this this opportunity at the mic, please also submit those in 834 01:08:33,679 --> 01:08:36,679 writing. 835 01:08:36,799 --> 01:08:44,400 » Um my name is Reyes or doesn't really matter. Um, but if I go home and I turn 836 01:08:41,679 --> 01:08:49,040 on the faucets in my house, um, I will be shut off water eventually. So, why 837 01:08:46,880 --> 01:08:50,560 does this standard not, you know, follow liquid status centers? 838 01:08:50,239 --> 01:08:53,759 » Y, >> our water is our most precious resource 839 01:08:52,400 --> 01:08:58,480 in the desert. And they're already talking about cutting us off from the 840 01:08:55,279 --> 01:09:03,199 Colorado River water. Um, and the second point is the last time I was here that 841 01:09:00,719 --> 01:09:08,640 your tag group of experts, none of them were explicitly against data centers, 842 01:09:05,520 --> 01:09:12,080 which you have a bias in there. If you have true expertise, some of them would 843 01:09:10,400 --> 01:09:16,159 lead to the fact that they don't believe data centers are are a viable option in 844 01:09:13,839 --> 01:09:20,000 our desert. You're picking first on if these people are pro data center and 845 01:09:17,920 --> 01:09:24,960 then decide their expertise among them. It's not fair. Um, finally, there needs 846 01:09:23,120 --> 01:09:29,440 to be a prohibitive uses of this data center. There is obnoxious uses such as 847 01:09:27,359 --> 01:09:33,762 immigration enforcement and mass surveillance. Um, that needs to be 848 01:09:31,742 --> 01:09:33,762 [applause] 849 01:09:38,319 --> 01:09:45,920 My name is Kathy Thompson. Um, I'd like to quantify what an actual need is. We 850 01:09:44,080 --> 01:09:50,739 don't need a data center. We need schools. We need hospitals. We need 851 01:09:48,400 --> 01:09:57,199 homes. We need food distribution. We [applause] don't need data center all of 852 01:09:53,359 --> 01:10:01,679 our use to just sell us more crap. It's going to end up in the landfill. Um 853 01:09:59,280 --> 01:10:05,520 these companies are rushing to build these data centers because the private 854 01:10:03,360 --> 01:10:11,199 capital is drying up. Companies like Blue Owl, Apollo, they have seen great 855 01:10:08,719 --> 01:10:15,600 drops in their stock prices recently. They they are just rushing to just take 856 01:10:12,880 --> 01:10:19,840 advantage of communities. Um I'd like to also find out if you're going to find 857 01:10:17,440 --> 01:10:23,280 for excess water use, what are you going to do? Go to the Midwest or the 858 01:10:21,280 --> 01:10:27,600 Northwest and buy more and ship it here? I mean, the fine doesn't do anything. 859 01:10:25,280 --> 01:10:32,480 The water is a precious resource for life. It's not for this technology 860 01:10:30,480 --> 01:10:38,609 behemoth that we're going to look at in 10 years and say, "Who the heck let them 861 01:10:34,719 --> 01:10:38,609 build that thing?" [applause] 862 01:10:42,000 --> 01:10:48,640 Hi there. My name is Melissa Westbrook. Um, number one, looking at that panel, 863 01:10:46,560 --> 01:10:54,960 it looks about white. Uh, [laughter] secondly, um, this thing has grammatical 864 01:10:52,400 --> 01:10:59,920 and one very glaring numerical error. If you need someone to proofread, I used to 865 01:10:56,480 --> 01:11:04,880 be a proofreader and editor. Um, I will say to you that again, we do need to 866 01:11:02,400 --> 01:11:11,760 understand why are we building these things? Why this rush for AI? It's 867 01:11:09,600 --> 01:11:17,840 dangerous. It's dangerous in our public schools. And that's my area of 868 01:11:13,440 --> 01:11:24,400 expertise. So, I don't I grew up here. I'm a pr proud wildcat. Water is our 869 01:11:21,280 --> 01:11:31,440 most precious resource. We are not going to give it away. We don't have it. The 870 01:11:28,159 --> 01:11:35,679 Colorado River, you guys have got to Somebody's got to put the brakes on. If 871 01:11:33,520 --> 01:11:40,120 it's all about money, I got you. If it's all about money, hey, 872 01:11:40,779 --> 01:11:42,799 [applause] 873 01:11:46,320 --> 01:11:54,080 my name is Aiden. I'm a member of local IU 140 or I local 140. Uh, I just have 874 01:11:51,920 --> 01:11:58,560 two things to say. one, as far as I can tell, AI has been used to power the 875 01:11:56,159 --> 01:12:02,000 worst elements in our society just over and over again. I can't see any real 876 01:12:00,239 --> 01:12:06,000 reason that it would be a benefit to our city to have one of these data centers. 877 01:12:03,840 --> 01:12:09,440 On a more procedural point, uh I have experience working with a lot of large 878 01:12:07,440 --> 01:12:14,159 corporations. They're going to violate your policies. They violate policies, 879 01:12:11,920 --> 01:12:19,520 safety policies, environmental policies constantly and with no regard. And so if 880 01:12:16,640 --> 01:12:23,360 your first thought is not how are we going to prevent them or stop them when 881 01:12:21,920 --> 01:12:26,080 they do violate these policies, you're looking at it from the wrong 882 01:12:24,320 --> 01:12:29,679 perspective, you're you're not going to stop them from using too much water or 883 01:12:27,920 --> 01:12:33,120 too much power or too much whatever. They do it on a regular basis. They will 884 01:12:31,440 --> 01:12:36,000 easily put their employees at risk. They'll take the blood out of your veins 885 01:12:34,480 --> 01:12:40,719 if you let them. And so if you're not looking at them as your enemy, you're 886 01:12:37,280 --> 01:12:40,719 looking at this wrong. 887 01:12:41,040 --> 01:12:43,060 » [applause and cheering] 888 01:12:43,440 --> 01:12:52,159 » HI, MY NAME IS DIANE Rosia and I'm a proud Tucson of 56 years and I'm a 889 01:12:48,400 --> 01:12:56,960 realtor. So, I house people here in our city. I have a question. 890 01:12:54,880 --> 01:13:02,640 Since Tucson already has a data center operating within the city limits at 891 01:12:59,520 --> 01:13:07,840 roughly 40,000 square ft of raised floor space, why wasn't that considered 892 01:13:05,120 --> 01:13:12,880 sufficient reason earlier to review whether the land use codes should 893 01:13:10,239 --> 01:13:17,920 address impacts such as setbacks, energy, water use, environmental 894 01:13:15,120 --> 01:13:24,040 compatibility, noise and generator use, and appropriate zoning before future 895 01:13:20,239 --> 01:13:24,040 applications arise. 896 01:13:24,926 --> 01:13:31,320 » [applause] >> have an answer before the next comment. 897 01:13:33,440 --> 01:13:40,880 » Okay, sorry about that. Um, yes. So, honestly, we hadn't heard any concerns 898 01:13:38,480 --> 01:13:46,159 related to that and it wasn't until we heard concerns from the public that we 899 01:13:43,280 --> 01:13:50,320 really needed we needed to go in and actually create regulations related to 900 01:13:48,080 --> 01:13:54,560 this and look at those attacks. And so that is the reason why those data 901 01:13:52,800 --> 01:14:00,080 centers were just functioning within industrial areas and it really we hadn't 902 01:13:58,480 --> 01:14:07,080 had any complaints by neighbors around there or anything else. That's the 903 01:14:01,920 --> 01:14:07,080 reason why until this point we hadn't. 904 01:14:08,960 --> 01:14:17,040 » Hi guys, it's April. I wanted to bring up two things. When my neighborhood 905 01:14:14,640 --> 01:14:23,120 wanted to install a traffic calming device with a grant in our neighborhood, 906 01:14:19,520 --> 01:14:29,280 we had to get signatures from 60% of the residents on that street. 907 01:14:26,159 --> 01:14:35,679 And yet, these proposed notifications are actually nowhere near 908 01:14:32,400 --> 01:14:39,360 the amount that should be compared to something like a community trying to get 909 01:14:37,600 --> 01:14:46,080 a very real benefit like a traffic calming. Secondly, I know that we know 910 01:14:43,600 --> 01:14:52,239 as people who have code and write code and deal with code in Tucson, we know 911 01:14:48,960 --> 01:14:58,239 how to make land uses prohibited. We know how to make it prohibited for 912 01:14:55,040 --> 01:15:03,600 shelters, for rehabs, for many other actual useful land uses. And that's why 913 01:15:00,719 --> 01:15:07,760 Mayor Castle just had to declare an emergency around homelessness to get 914 01:15:05,199 --> 01:15:11,600 over those codes. I encourage you to learn from what you do well already 915 01:15:10,382 --> 01:15:15,400 [laughter] and apply that to this situation. Thank you. 916 01:15:19,600 --> 01:15:29,760 » Hi, my name is Reed. Um, I'm I'm tired. I'm tired of this. I'm tired 917 01:15:27,600 --> 01:15:33,600 of coming to these meetings. I'm tired of saying the same things over and over 918 01:15:31,840 --> 01:15:38,480 again to the city officials, specifically mayor and council, who do 919 01:15:36,080 --> 01:15:43,440 not appear to be listening. Why should we expect mayor and council to listen to 920 01:15:40,880 --> 01:15:49,199 you or to listen to the feedback that we have given you when they were spending 921 01:15:46,560 --> 01:15:53,280 they spent a couple years before they told anyone about project blue working 922 01:15:51,199 --> 01:15:59,520 behind the scenes to make it happen? They were meeting regularly with Amazon 923 01:15:55,760 --> 01:16:04,719 every few weeks. I think 2024, 2025 to get advice from Amazon about Arizona 924 01:16:02,239 --> 01:16:09,360 water law and they never thought to tell the people of Tucson. These are the 925 01:16:06,560 --> 01:16:14,560 people you're reporting to. My question for you is, how are you, given that 926 01:16:12,159 --> 01:16:18,719 betrayal, how are you going to get them to listen to you? How are you going to 927 01:16:16,320 --> 01:16:23,798 get them to listen to us? Cuz I don't have any faith that they will. 928 01:16:21,778 --> 01:16:23,798 [applause] 929 01:16:26,239 --> 01:16:31,760 Hi there, Derek Espalos. I am an accountant, a data analyst, and a 930 01:16:30,400 --> 01:16:35,600 current candidate for the Arizona Corporation Commission, which I can 931 01:16:33,360 --> 01:16:41,520 assure you is not going to protect anyone from anything that happens. So, I 932 01:16:39,520 --> 01:16:46,800 have three questions. I'm just going to throw them out there. Why should we 933 01:16:43,280 --> 01:16:50,400 trust this process? Because there, as was just mentioned, we've been through 934 01:16:48,560 --> 01:16:55,520 this process. We keep going through this process and no trust is never 935 01:16:52,400 --> 01:16:59,520 established. The second question is, are you going to disclose how you're 936 01:16:57,360 --> 01:17:05,280 scraping and putting together this data? Because having the binary options mixed 937 01:17:02,159 --> 01:17:09,440 with the comment option leads to a lot of statistical bias. And finally, when 938 01:17:08,159 --> 01:17:14,040 will [clears throat] Tucson understand that no means no? 939 01:17:11,040 --> 01:17:14,040 » No. 940 01:17:14,719 --> 01:17:19,199 » Response before the next. >> Yeah, I want to respond to that question 941 01:17:17,600 --> 01:17:23,040 and the previous question about the process and where is this feedback 942 01:17:20,960 --> 01:17:27,600 going? How do you know this is going to be listened to? So, our mayor council is 943 01:17:25,440 --> 01:17:31,440 very interested in the feedback from the public and the technical advisory 944 01:17:29,120 --> 01:17:36,480 committee. That's actually why they put a pause on project blue last summer so 945 01:17:34,480 --> 01:17:39,920 that we could have a broader community conversation about what are the 946 01:17:38,159 --> 01:17:43,920 safeguards we need to have in place for our community as these uses are 947 01:17:41,760 --> 01:17:48,239 proposed. So, I think it's exactly in reaction to what they heard from the 948 01:17:45,840 --> 01:17:52,080 community that they directed staff to make sure we have protections and guard 949 01:17:50,400 --> 01:17:56,719 rails in place for our community. So, that's their intent with this process. 950 01:17:54,320 --> 01:18:02,159 Um, and we will be taking all of this feedback to mayor and council in the 951 01:17:58,880 --> 01:18:06,640 next month or so um to give them an update on what we've heard so far and 952 01:18:04,880 --> 01:18:10,679 give them an opportunity to provide additional feedback and direction. 953 01:18:13,920 --> 01:18:23,280 Hi, my name is Leilani. Um, a comment and then a question. Um, under the 954 01:18:19,360 --> 01:18:29,920 location and design section, I believe there was a bullet that said the 955 01:18:25,440 --> 01:18:35,040 applicant would propose the regulations. I find that comical. Why would we afford 956 01:18:32,719 --> 01:18:42,800 the applicant the right to propose the regulations? I don't know if you're 957 01:18:38,400 --> 01:18:50,400 looking for feedback on how we should incorporate or mandate the process as 958 01:18:46,719 --> 01:18:56,320 well as the feedback on the impacts. Um, and then also with regards to the 959 01:18:53,679 --> 01:19:02,159 penalties that have been assessed, I'd like to know over the last 10 years what 960 01:18:59,840 --> 01:19:06,400 the financial penalties that have been assessed. He didn't mention, Chris did 961 01:19:04,640 --> 01:19:11,360 not mention uh and because we know there no one's 962 01:19:08,640 --> 01:19:16,239 monitoring it. Um and that would show that it would support that no one's 963 01:19:14,480 --> 01:19:22,719 monitoring it. So the financial penalties I'm curious what that amount 964 01:19:18,320 --> 01:19:25,360 is. Um yeah, I know. But um >> you're good. 965 01:19:24,159 --> 01:19:31,840 » Okay. >> Yeah. Okay. Um with regards to the 966 01:19:29,280 --> 01:19:38,560 applicant demonstrating the access to energy Okay. Okay. Go ahead and respond. 967 01:19:35,600 --> 01:19:42,560 » I'll get back in line if there's still by the way I'm happy to speak and talk 968 01:19:40,880 --> 01:19:47,760 through the details of some of those. I'm not entirely sure about the um 969 01:19:45,199 --> 01:19:51,440 applicant proposing. Um I will say related to the large quantity water use 970 01:19:49,440 --> 01:19:59,679 ordinance. It was just put in place in August and as Scott has mentioned 971 01:19:53,920 --> 01:20:02,560 previously um existing there are no uh large quantity water people that would 972 01:20:01,360 --> 01:20:06,400 actually qualify for that that are on the portable system and the only ones 973 01:20:04,320 --> 01:20:10,080 that are really in the in the city. There's only a handful and they're on 974 01:20:07,760 --> 01:20:14,800 the reclaimed system as of now. And so that kind of gives you an understanding 975 01:20:12,320 --> 01:20:17,760 of how large of the that threshold is, but it also gives you an understanding 976 01:20:16,239 --> 01:20:21,440 of kind of the reason why there wouldn't be any penalties because no one is 977 01:20:19,760 --> 01:20:24,440 actually a part of that program at this point. 978 01:20:26,640 --> 01:20:32,719 » Good evening. Thank you for taking my question. My name is Albert. I am a 979 01:20:31,199 --> 01:20:37,280 retired uh environmental biology teacher. And 980 01:20:35,600 --> 01:20:44,719 one of the things I used to teach my students when it became the topic of 981 01:20:40,480 --> 01:20:48,159 water was the concept of water mining. And most people don't understand what 982 01:20:46,480 --> 01:20:53,360 water mining is. So I'm going to address you guys. That is when you take more 983 01:20:51,280 --> 01:20:59,120 water out of the ground than reflections. There's nothing in a hole 984 01:20:55,679 --> 01:21:04,719 and pumping water. Just water was limited by 2025 by law to stop water 985 01:21:02,960 --> 01:21:11,120 mining. And that's why we started blending cap water. Any development in 986 01:21:08,159 --> 01:21:19,280 town has to be a guaranteed 100year water supply. How is billions of gallons 987 01:21:15,440 --> 01:21:26,320 a month going to guarantee that this data center will will have enough water 988 01:21:22,800 --> 01:21:31,360 supply for a 100 years. And how are we going to do that without water mining? 989 01:21:28,719 --> 01:21:37,880 That would be my question perhaps for the lawyer of Susan. Thank you. I think 990 01:21:34,640 --> 01:21:37,880 the [applause] change 991 01:21:39,120 --> 01:21:44,360 2030 used to be 2025. 992 01:21:46,661 --> 01:21:51,360 [clears throat] >> All right. 993 01:21:49,440 --> 01:21:55,679 » So to help answer that question, one of the requirements of the large quantity 994 01:21:53,440 --> 01:21:59,360 water users policy was that they do have to fall within our assured water supply. 995 01:21:57,920 --> 01:22:02,880 So that is one of the requirements that we would look at to make sure that we're 996 01:22:00,560 --> 01:22:07,840 not going above and beyond. Um so that is one of the things that we have that 997 01:22:04,480 --> 01:22:11,360 much water in the desert. >> We have that much water. 998 01:22:09,280 --> 01:22:14,520 » We have a very resilient supply as of right now. 999 01:22:18,080 --> 01:22:25,760 » Okay. I want to let you know we have our hard stuff at 8 because we have to leave 1000 01:22:23,120 --> 01:22:30,080 this room. It will continue in the lobby and staff will stick around for at least 1001 01:22:27,679 --> 01:22:35,280 a half an hour and can talk individually with all of you. So, let's continue. We 1002 01:22:32,320 --> 01:22:41,040 can get in hopefully three more people. >> Hi, Elena native Tonan. Um, I want a 1003 01:22:38,480 --> 01:22:46,320 future in Tucson, which is why I'm here. Um, I just want to add my voice to the 1004 01:22:44,080 --> 01:22:50,320 many voices here who are asking to see more prohibitive zoning that would 1005 01:22:48,159 --> 01:22:56,880 actually prohibit hypers scale data centers in the city t of Tucson limits. 1006 01:22:53,840 --> 01:23:02,800 Um, I see some of the efforts in the proposed code to mitigate harms um from 1007 01:23:00,239 --> 01:23:06,719 this development. I appreciate that and frankly it's just not enough. Um, I 1008 01:23:05,280 --> 01:23:11,360 think we're still seeing that communities are facing disproportionate 1009 01:23:09,040 --> 01:23:16,080 harms while we don't really get to see any of the benefits, frankly, of these 1010 01:23:13,600 --> 01:23:20,639 projects. Um, I have major concerns about enforcement and monitoring. Who 1011 01:23:18,639 --> 01:23:23,679 does this? Is this sufficient? Particularly, as folks have mentioned, 1012 01:23:22,080 --> 01:23:27,920 for companies that are making billions of dollars. Um, you seem to imply in 1013 01:23:26,080 --> 01:23:32,159 some of your answers and some of what I saw written that it's up to the public 1014 01:23:29,679 --> 01:23:36,960 to like call in. Um, so anyway, I want to understand the enforcement and the 1015 01:23:33,840 --> 01:23:43,120 monitoring mechanisms. Um, how do data centers fit into plan Tucson and how 1016 01:23:40,960 --> 01:23:49,600 you're prioritizing economic development in the city? A plan Tucson general plan 1017 01:23:46,320 --> 01:23:55,960 is a reflection of a city's values. Is like, do we value this? Is this within 1018 01:23:51,840 --> 01:23:55,960 our values? Is this something 1019 01:23:57,008 --> 01:23:59,028 [applause] 1020 01:23:59,199 --> 01:24:05,840 about us? Hi. Um, I am not an expert in anything 1021 01:24:03,760 --> 01:24:09,120 unfortunately. Um, I just had a couple of like facts that I just kind of 1022 01:24:07,120 --> 01:24:14,719 Googled really quickly. Um, so that's a quick quick Google search. Um, you can 1023 01:24:11,440 --> 01:24:21,520 see that AI in 2025 used about give or take 3 312 to 764 billion water liters 1024 01:24:19,040 --> 01:24:26,159 of water this year, last year alone. And it's projected that in Phoenix um, data 1025 01:24:24,080 --> 01:24:30,719 centers could consume up to 3.8 billion gallons of water per year. Tucson 1026 01:24:28,400 --> 01:24:34,320 doesn't have that kind of water. Do we want the water to go to people in 1027 01:24:32,719 --> 01:24:39,638 communities or do we want it to go to data centers here? Yep. [applause] 1028 01:24:39,920 --> 01:24:44,960 » Hi, my name is Brandon. This might be normally where I take do the courageous 1029 01:24:43,679 --> 01:24:47,360 thing and thank you for hosting this meeting, but we're not thankful that we 1030 01:24:46,320 --> 01:24:50,800 have to keep coming out to these meetings and talking to you guys. Last 1031 01:24:49,440 --> 01:24:54,000 summer, we told you we don't want a data center in the desert. It does not make 1032 01:24:52,159 --> 01:24:58,159 sense for us. no matter what regulations you put on the screen, um it's just not 1033 01:24:56,719 --> 01:25:01,120 right for the desert. It doesn't make any sense here. Um and instead of 1034 01:24:59,840 --> 01:25:04,719 listening to us, you guys have jumped to this inevitability that the data center 1035 01:25:03,600 --> 01:25:06,239 has to be here. So, let's just go ahead and figure out how we're going to 1036 01:25:05,600 --> 01:25:08,719 regulate that. >> They're not inevitable. 1037 01:25:07,520 --> 01:25:11,679 » They're not inevitable. That's what we're here to tell you. We don't have to 1038 01:25:10,159 --> 01:25:14,400 have a data center in the desert. It doesn't make sense to do it. The first 1039 01:25:13,199 --> 01:25:17,840 question on your frequently asked questions flyer is, can we prohibit a 1040 01:25:16,560 --> 01:25:19,520 data center from being here? >> Yeah. 1041 01:25:18,239 --> 01:25:22,320 » Instead of answering that, you've just told us what a data center is. If you 1042 01:25:21,040 --> 01:25:25,840 look at that, the question should be, "What is it actually?" You didn't answer 1043 01:25:23,840 --> 01:25:28,960 the question. Um, but I think in one of your slides, you maybe did because it 1044 01:25:27,199 --> 01:25:30,719 says that the city is able to control land use. 1045 01:25:30,000 --> 01:25:34,000 » Yeah. >> So, instead of having these regulations 1046 01:25:32,560 --> 01:25:37,679 and these conversations, how about we stop stop and talk about how we're going 1047 01:25:36,239 --> 01:25:41,000 to not have a data center here. It does not make sense. 1048 01:25:41,154 --> 01:25:46,880 [applause] We'll take the last question, but I 1049 01:25:44,800 --> 01:25:50,800 think it should be noted that there's a complete error in the response to the 1050 01:25:48,880 --> 01:25:54,960 first question. That's not actually the response. They just discovered this. 1051 01:25:52,719 --> 01:25:59,679 Final question for comments. >> Hi, my name is Lee and my question is 1052 01:25:57,199 --> 01:26:02,880 why was TEP allowed on the technical advisory committee when they have a 1053 01:26:01,120 --> 01:26:07,520 vested interest in building data centers? [applause] 1054 01:26:05,600 --> 01:26:12,480 The for-profit company, the Canadian company that owns TP said they plan to 1055 01:26:09,600 --> 01:26:15,520 spend$ 1.5 to2 billion on additional generation. So, it seems like we 1056 01:26:14,159 --> 01:26:19,440 shouldn't have someone with a vested interest guiding this. Um, I also want 1057 01:26:17,760 --> 01:26:23,120 to know if you're looking at all about the connection of this map and 1058 01:26:20,960 --> 01:26:26,560 environmental racism cuz these seem like the communities like on the southside 1059 01:26:25,040 --> 01:26:29,920 that have been poisoned for generations and generations. So, if you're not going 1060 01:26:28,239 --> 01:26:33,600 to put one in the foothills, I don't think you should put a data center 1061 01:26:31,120 --> 01:26:36,880 anywhere in the final question. Why is there so many 1062 01:26:35,360 --> 01:26:41,360 police here? This is a community meeting. It feels like to have a whole 1063 01:26:39,360 --> 01:26:44,960 line of police here. So, >> yeah, I would really like to look at 1064 01:26:43,120 --> 01:26:51,295 facts to include environmental justice and the history of of pollution in 1065 01:26:47,199 --> 01:26:51,295 Tucson. Thank you. [cheering] 1066 01:26:51,895 --> 01:26:53,915 [applause] 1067 01:26:54,239 --> 01:27:01,040 » We really need all the feedback. Thank you for sharing your concerns, 1068 01:26:58,480 --> 01:27:04,639 questions, and input in this process. It is definitely going to shape what we 1069 01:27:02,880 --> 01:27:08,159 take to Mayor Council and where this process ultimately goes for our 1070 01:27:06,159 --> 01:27:12,960 community. So, thank you all for being here tonight. We will be around um in 1071 01:27:10,880 --> 01:27:16,400 the lobby for more questions and discussion if folks have more time and 1072 01:27:14,639 --> 01:27:20,560 more questions that you want to ask. Um but we do need to leave the auditorium 1073 01:27:17,920 --> 01:27:24,880 now so that uh Ringcon High can close up for the evening. Thank you very much to 1074 01:27:22,400 --> 01:27:28,600 Ringcon High for hosting us and thank you all for being here.