[0:05] All right, good evening everyone. Thank you so much for being here. We really [0:09] appreciate you spending some of your evening and your time to engage on this [0:15] important community topic. My name is Corin Manning. I'm the [0:19] director of the department of planning and development services for the city of [0:23] Tucson. And I want to introduce some of the team who will be here tonight to [0:27] present on this topic. Um, we have Carver Stru, principal planner with [0:32] planning and development services, Nicholas Martell, our long-range [0:36] planning section manager, Dan Bersik, planning administrator, as well as [0:40] Tonnie Robertson, our facilitator for this evening, here to support the [0:45] conversation and dialogue. Uh, so tonight's meeting is about regulations [0:51] for largecale data centers. Um, this is a really important topic that's [0:56] generated a lot of community conversation. So, we're really here to [1:00] share information and have an opportunity for feedback and discussion [1:03] tonight. Um, so data centers are a rapidly evolving technology. They're [1:08] really new emerging use and our responsibility as a city is to make sure [1:13] that our land use regulations keep pace with emerging trends in a way that [1:18] reflects our community's values and priorities. So that's really what we're [1:22] trying to do with these proposed regulations. [1:32] Okay. So how tonight will go, what we are here to do. We're going to explain a [1:37] little bit of background um why we're here, how we got here in terms of [1:42] developing these regulations, talk a little bit about some existing city [1:45] policy um and existing regulations. [1:49] um talk about the process so far to develop regulations for large scale data [1:54] centers um including our technical advisory committee and then share an [1:58] overview of the proposed regulations for large scale data centers um and have [2:03] opportunity for feedback along the way. So tonight's meeting is really about [2:07] sharing some information about what's proposed and then most importantly [2:13] hearing from all of you. So there's going to be opportunity for feedback [2:16] throughout the presentation and then at the end we do want to have time for [2:21] questions and answers. So we do ask that during the presentation um we limit [2:27] questions and comments to just clarifying questions um so that at the [2:32] end we can have some dialogue and Q&A about this topic. [2:37] Um and there's also going to be there's um comment cards and other ways to get [2:42] input as well. Um, we have already gotten a lot of input and feedback on [2:47] this topic. Um, and we've started developing a Q&A FAQ uh, form that some [2:53] of you may have gotten when you came in. So, we've really tried to take a lot of [2:57] the key questions and comments that we're getting and start responding to [3:01] those and we will be building out that FAQ as we go through this process and [3:05] get additional questions and comments. So all of your feedback is being [3:09] reviewed by staff and uh responded to and integrated into the process. [3:16] So how we got here? Um we are here based on direction from our mayor council to [3:22] establish guardrails for our community related to large scale data centers. [3:27] Following the consideration of the project blue proposal, mayor and council [3:32] gave us direction to establish guard rails for our community to develop a [3:38] regulatory framework for the for the use uh of large scale data centers to [3:45] protect Tucson and our resources and to develop standards for this new use as [3:51] well as a review process. So throughout the discussion of project [3:55] bloom, we heard a range of questions and concerns about large scale data centers. [4:00] We heard from residents about issues such as water, energy use, noise, visual [4:05] impacts, whole range of community concerns and issues um which are very [4:11] important topics and a conversation that really affects our whole community and [4:15] quality of life. That's why we're here today to engage in this dialogue and [4:19] have more conversation about the impact of this use and how we can ensure that [4:23] we have appropriate regulations in place to regulate um this emerging use. As we [4:30] were going through the project blue discussion, we found that our zoning [4:33] code does not currently have data centers as a clearly defined land use. [4:38] So we don't have regulations for this type of use. This creates a lack of [4:43] clarity for our community, creates uncertainty for neighborhoods, for our [4:47] policy makers, um, and for potential applicants. So, what we're trying to do [4:52] now is take a more proactive approach to develop these regulations and guard [4:56] rails. Um, so rather than reacting to a specific proposal, we're here trying to [5:03] establish clear and enforceable guidelines um, in advance of future [5:08] proposals. So what we're trying to do is create clear standards that protect our [5:13] neighborhoods, our natural resources, and provide predictability so that if a [5:19] data center facility is proposed, we have an appropriate set of land use [5:23] regulations and standards to evaluate a proposed development. [5:29] Based on the direction from mayor council, we have done a quite a bit of [5:33] research into data center regulations in other communities as well as the impact [5:37] of data centers in other communities and we established a technical advisory [5:41] committee to help inform the proposed standards that we're creating. We also [5:46] developed a large quantity water users ordinance in the city. That was actually [5:50] something that was in progress um prior to the project blue discussion and that [5:54] has been adopted by the city um and is being refined now based on public input. [6:00] That ordinance is meant to work in parallel with these proposed zoning [6:04] regulations for large scale data centers and we'll share a bit more about that a [6:08] little later on. So again, tonight's meeting is not to discuss a specific [6:11] proposal. The discussion tonight is about setting guard rails and [6:16] establishing standards for our community so that if a proposal comes forward, we [6:20] have conditions and a process in place to evaluate any proposals. [6:26] So, I want to talk a little bit more about zoning regulations because zoning, [6:31] which is what we're here to talk about tonight, is just one piece of a larger [6:35] picture in terms of regulations that affect large scale data centers. So [6:40] there's other local regulations that could shape where and how large scale [6:44] data centers are developed. That includes things like the large quantity [6:48] water user ordinance that I mentioned as well as economic development policies [6:53] and other city policies. Um there's also federal and state regulations that come [6:58] into play such as state economic incentives and the Arizona Pooperation [7:03] Commission's regulation of our utilities. So tonight's discussion is [7:08] really focused on zoning and land use regulations. [7:13] Zoning is a uh zoning is a set of regulations that focus on where [7:20] development can occur, where different uses can be located, how those uses are [7:25] built, what specific conditions apply to different types of land uses. um that [7:30] could be conditions, development standards like buffers, setbacks, [7:33] screening, height limits, c certain standards like that that can be applied [7:38] to specific types of uses. Um so zoning does not regulate water [7:45] use, energy portfolios or energy infrastructure decisions. um those are [7:52] valid and important topics of discussion, but those rest with other [7:57] review bodies and other entities that have purview in those areas. So [8:01] tonight's discussion is really going to focus on what is within the city's [8:05] control and what is before us at this time, which is zoning or land use [8:09] regulations to provide appropriate standards and regulations for large [8:13] scale data centers in Tucson. So let's get into that conversation. I [8:20] want to thank you again for being here tonight, for being part of this [8:23] important conversation. And I'm going to ask Tonnie to walk us through the [8:29] process and ground rules for tonight. [8:34] Good evening. Good to see you all. Uh my name is Tony Robertson with Southwest [8:39] Decision Resources and I just have two slides. [snorts] [8:44] Meeting format. I think we've seen several of you were in the last meeting [8:49] or two. So, good to see you again. Um, so your feedback is going to be [8:55] collected in writing in these meetings via online survey which you'll be seeing [9:02] a QR code and you can use your phone to get access to that website. Um, the [9:08] paper form, the green form on the clipboard is the same questions. So [9:13] either option works and you can take uh provide your comments during the meeting [9:18] or after the meeting. I believe it'll be open through this month through the end [9:22] of March. Um and then the sticky notes on the posters in the lobby. All of that [9:27] feedback is being compiled and the city team is reading through everything very [9:31] carefully. They did create the FAQ document that was in the registration [9:36] table like Corin mentioned and they'll be adding more questions as they go. Um [9:43] again, all written feedback will be made publicly available and shared with both [9:47] the planning commission and mayor and council. Uh conversation and additional [9:52] written feedback are encouraged with city staff before and after the [9:56] presentation um we will have a like the last inerson [10:01] meeting at Pua High School will have a Q&A session here in the main in this [10:06] room. Um, we're going to be asking that people keep their comments to under a [10:11] minute so that more people can have a chance to speak. We had a number of [10:14] people that wanted to be able to ask a question or make a comment last time. [10:19] Um, this the website has all of the links, [10:22] all of the information and uh we ask that everybody respect each other's time [10:27] and refrain from disruption. [10:32] And again, so in this room is the presentation. [10:36] Um, we have different presenters from the city that are going to be walking [10:40] you through the different components of the proposed zoning code and giving you [10:45] a chance as you go to make comments in the uh online survey or the written [10:51] survey. Um feedback again can be submitted in both both of those formats [10:58] in and then the the uh the Q&A afterwards in the lobby is the dialogue [11:03] opportunity directly with city staff. You're not restricted to any particular [11:07] amount of time. There's posters that have all the same information that's [11:10] going to be in the presentation. Again, this is about this proposed zoning uh [11:16] code, but you a lot of you have feedback beyond that and we're gathering all [11:21] feedback. So, I will turn it over to Parker. [11:40] » All right. Good evening. Uh my name is Carver Stru. I'm a principal planner [11:44] here with the City of Tucson Department of Planning and Development Services and [11:48] I'm going to talk a bit about the proposal that that we are here to [11:52] discuss tonight. Um as was mentioned earlier, this relates specifically to [11:57] zoning and regulating largecale data centers. One of the first things that [12:02] you want to do if you are going to regulate a land use is to define what it [12:07] is that you're regulating. And so what we've put forward Oh, I'm sorry. Let me [12:12] back up. Um going going a little ahead of myself. Uh I want to start talking [12:17] first about what is a large-scale data center. So what is it that we're talking [12:21] about before we start discussing regulating it? So a large scale data [12:25] center is a warehouse filled with thousands of computers working 24/7 to [12:30] store, process, and deliver digital services and data. uh data centers house [12:36] computer equipment, networking equipment, storage devices. These are [12:40] the items that power all of the digital infrastructure that we use. [12:47] Most data centers have a number of different key components. Um these [12:50] include server racks uh that house and organize servers, networking equipment [12:56] uh which moves the data or processes the data, storage systems to store data, uh [13:01] power infrastructure which obviously powers the equipment and cooling systems [13:06] to remove the heat that is created by a data center. [13:13] So really when we're asked to regulate data centers, the the purpose there is [13:18] to set clear rules and standards for their location and design. The intent of [13:24] this is to protect senate sensitive areas. Address impacts such as noise, [13:29] scale, and other impacts early on in the process. Develop a process that ensures [13:34] public input as data center proposals are developed. and be proactive in terms [13:40] of what standards should be in place versus uh reacting to a specific [13:46] proposal as it comes forward. So the city currently has very limited [13:55] standards related to how we regulate data centers. Traditionally as data [14:01] centers were being developed is they were small relatively small they were [14:05] viewed as storage uses um these were you know it made sense you're looking at it [14:11] kind of like as a warehouse but for data and so they were regulated as such. [14:17] However, as we saw new large scale and hypers scale data centers emerge as a [14:23] land use that has never existed before, we started to look at it differently. [14:28] And the city zoning administrator determined that a large-scale data [14:32] center would be classified under the city's zoning code as a utility [14:38] generating system use. As such, it could only be reviewed as a planned area [14:44] development or a planned community development. [14:48] Um, so this is really just defining what it would be as a stop gap measure and [14:54] deciding what process could be used to review a proposal for a data center. [15:00] Under the current code, it's very clear that we really don't have any existing [15:05] standards to regulate their development or place guard rails on their [15:09] development. As such, it's really at this point in time under the code [15:14] largely up to a specific applicant to propose how they would like to develop a [15:19] data center. Uh so with additional standards as we're going to be [15:23] discussing tonight uh mayor and council can provide limitations or guard rails [15:29] on how data centers would be developed which could reflect values of Tucson. [15:35] So this next slide really just shows what is currently in place under the red [15:41] box which is essentially just a process for reviewing a data center proposal and [15:47] then proposed standards that we are putting forward in this proposed zoning [15:54] amendment and seeking your feedback on related to any number of things. you [16:00] know, defining a data center, establishing where and how they would be [16:03] allowed. Um, being establishing a clear and transparent public review process [16:09] for specific data center proposals, requiring that a data center demonstrate [16:14] access to water and power and disclose the energy mix in such a proposal. Um, [16:22] prohibit the use of portable water for cooling if not subject to the large [16:27] water user ordinance. requiring additional setbacks which would relate [16:31] to noise impacts or other impacts on the community setting clear noise [16:36] limitations any number of different items and we'll be going through these [16:40] in in subsequent slides but I really just want to make the point that this [16:44] demonstrates where we are looking at establishing regulations for where none [16:49] currently exist other than that simple process. [16:54] So as we talk about zoning, uh any authority to regulate land through [17:00] zoning by a city or town in Arizona is given to them by the state. State law [17:05] decides what can be regulated through zoning and is very specific that that [17:10] the cities or towns can regulate land use, building size, shape, height, [17:15] materials and purpose, site dimensions, setbacks, lot coverage, what percentage [17:21] of the lot would be covered by a structure and the location and use of [17:25] buildings. However, we are limited through zoning on what can be regulated [17:31] related to water and energy use. Uh, however, there are other provisions as [17:36] as Corin had mentioned, zoning is simply one component of the entire process to [17:42] regulate data centers. Um, and as mentioned earlier, uh, it's critical to [17:47] define a data center when you are looking to regulate it. Additionally, [17:52] due to the processes in place as well as the process being proposed, any data [17:57] center proposal would need to comply with plan Tucson 2025, our new general [18:04] plan. [18:07] So the process for reviewing and considering and developing reviewing and [18:14] considering a ordinance for uh zoning regulations for large-scale data centers [18:20] is is outlined here. Um it begins with mayor and council direction where Marin [18:26] council requested that city staff develop this code proposal. Uh we then [18:32] formed a technical advisory committee which is an advisory committee made up [18:37] of volunteer subject matter experts across a broad array of areas related to [18:42] data centers who provided information and best practices on regulating data [18:48] centers. From there we moved into our community meetings. This is the fourth [18:54] of four community meetings that we have scheduled. two in person and two virtual [18:59] to receive community feedback on the proposal. Now, for those of you who have [19:04] been to the previous meetings, the the rest of this is a little bit different. [19:08] Um, we've received some guidance that mayor and council would like us to uh go [19:14] before them in April for a study session to brief and council on what we have [19:19] heard in these community meetings and receive feedback. And so, that is the [19:23] next step in the process that that will be forthcoming. that is not a vote on [19:27] anything. That is simply a study session to brief them. Um, as we go through that [19:33] process, we'll continue to gather community feedback. The survey will [19:37] remain open and then based on feedback we received. Uh the next steps in the [19:42] process are a planning commission study session at a time yet to be determined, [19:47] a planning commission public hearing where the public will be invited to [19:52] speak specifically on this proposal yet to be determined and then mayor and [19:56] council consideration. So more to come on that and certainly as we have more [20:00] information on the specifics, we will be updating our web page on that. [20:06] So, as we're considering developing these regulations, we are really looking [20:11] at guidance from other plans and policies that are currently in effect [20:16] within the city. These are plans and policies which have either been ratified [20:20] by the voters in the case of plan Tucson or adopted by mayor and council as [20:25] official policy. These include, as I mentioned, plan Tucson, uh the Tucson [20:30] resilient together, which is our climate action plan, the city's comprehensive [20:34] economic development strategy, the one water 2100 master plan, the large [20:40] quantity water user ordinance, building codes, as well as other provisions [20:45] within within the unified development code, which is our zoning code. uh [20:50] things related to items such as rainwater harvesting or um other [20:54] development standards that would be applicable for a structure like a data [20:59] center just like they apply already to any other structure uh within the city. [21:05] So the one item that I mentioned there is the large quantity water users [21:08] ordinance and we've got Scott Shadweller here who is going to speak a little bit [21:14] about that from Tucson water. >> All right. Thanks Carver. Good evening [21:19] everybody. As Cover mentioned, my name is Scott Schwab. I'm deputy director at [21:22] Tucson Water. Uh, similar to this ordinance, um, we developed a large body [21:27] water user ordinance. Um, last year, uh, it was put in place because we didn't [21:31] have any guardrails up. We didn't have any, um, guidance on thresholds for [21:36] water use. So, when a new developer, a new development, um, came to Tucson [21:40] looking for water, looking to develop, um, we worked out the engineering piece, [21:44] we worked out the hydraulics and whatever infrastructure was required. um [21:48] you know we move forward with that if uh if applicable. So the large quality of [21:53] water users ordinance was approved by mayor and council in August of 25. Uh it [21:58] is in place today. Um it really sets the guardrails for um establishing what uh [22:04] you know defining what a large water quantity user is. And that threshold was [22:09] set at 10,000 ccf or that was the equivalent of about 7.4 7.5 million [22:16] gallons per month. That's an annual average. Uh so they could use a little [22:20] bit more one month or a little bit less one a month, you know, taking into [22:23] account for weather, things like that. Um just to put that into context, our [22:28] average residential user uses about 8 CCF. Um so this is the equivalent of [22:33] about 1,200 single family homes or so. We do not have any portable customers on [22:38] our system right now that use 10,000 ccf or more. We do have some on the reclam [22:42] system, but those are mostly tied to large uses such as golf courses or [22:48] whatnot. Um, so this ordinance applies to any large water user. In fact, this [22:53] ordinance does not specifically call out data centers. It does not mention them [22:57] um by name at all. It is any large water user that comes. So, any potential [23:02] manufacturer um any other type of user that would use this much water. It [23:06] applies to any new development uh that comes in. So from the ground up uh it [23:10] would also apply to anybody who wants to upgrade their facility. Uh for example, [23:14] if they want to expand services and go from uh you know a certain meter size up [23:19] to above 10,000 ccf, they would have to comply with this ordinance as well. Um [23:25] what is required by this policy? Uh any large water users would have to submit a [23:29] sustainable uh water service application which includes a conservation plan uh to [23:34] Tucson Water for review. Uh this includes things like defining how [23:38] they're going to use the water, what they're going to use, what their [23:40] conservation policies are. Um is it being done in the most efficient way? Uh [23:46] if deemed complete by Tucson Water, it will be put before mayor and council for [23:50] their ultimate approval. Um where it will be presented. So that ultimately [23:54] this is each large water unit does need to be approved by mayor and council. Uh [23:59] similar to this ordinance as well, we did have a technical advisory committee [24:04] uh that finished up just recently. We have stakeholders from the community [24:07] from the economic development uh side, the environmental uh stakeholder groups. [24:13] Um they all provided comments that information was presented to mayor and [24:17] council uh last month uh for their review. So that is that's information [24:21] that they are uh looking over right now. And if they do deem uh you know any [24:26] updates or any modifications of the policy necessary, that's something I'll [24:30] come back for in future months. That'll turn back over. [24:43] » Thank you, Scott. [24:48] So Scott mentioned a technical advisory committee for the large quantity water [24:52] users ordinance. Uh I want to clarify that there was also a technical advisory [24:56] committee formed for the data cent's zoning code amendment. They are two [25:02] different bodies. So just just to clarify that they're comprised of of two [25:06] different groups of people. However, the technical advisory committee for data [25:10] centers uh was established based on direction that we received from mayor [25:15] and council. Uh its purpose was to share knowledge and expertise and discuss key [25:20] issues related to land use environmental concerns, resource consumptions, [25:25] particularly water and power as well as infrastructure needs for data centers. [25:30] The committee was formed to uh help us all learn about and provide input or on [25:35] best practices, new technologies and approaches that were undertaken in [25:40] other cities or jurisdictions. Uh the TAC was asked to advise on options to [25:46] regulate large-scale data centers and recommend topics and standards for the [25:51] proposed zoning amendment. I want to be clear that the TAC is not a [25:55] decision-making body. They were simply advisory that were providing input into [26:00] the proposed standards. Uh there there was a desire for consensus, but it [26:06] wasn't always achieved. And so it we aren't necessarily saying that every TAC [26:11] member agreed with everything that um came out of the recommendations but they [26:16] did provide advisory input. So the TAC uh includes 13 members from [26:23] various groups. Uh they range from watershed management to TE. So really we [26:28] tried to get as many different groups as we could involved in the committee to [26:32] provide their input. Um, additionally, we have uh had support from city staff [26:39] across multiple different departments. Uh, they were not members of the TAC, [26:43] but they did provide input uh related to uh sustainability, energy use, uh, water [26:48] resources, economic development, um, just across multiple areas to ensure [26:53] that multiple different viewpoints were considered when when developing uh, some [26:58] of the proposed components. Um and again these these the members of the TAC [27:03] included environmental resources, power supply, energy equity, people also [27:08] involved in data consent data center construction as well as people involved [27:13] in the operation of data centers locally within Tucson. [27:20] Uh we also looked at uh what the TAC thought was important at the very [27:25] beginning of the process. uh we surveyed TAC members on what components were of [27:30] greatest concern to them individually. Uh the feedback we received um was that [27:36] water and energy consumption were of greatest concern which is something we [27:41] certainly are aware of. Um air quality concerns also came ranked fairly high as [27:47] did noise concerns and that was also really closely related to setback from [27:53] adjoining land uses. uh so that and location so that they could be in areas [27:59] that that were not already heavily developed. Uh concerns were also [28:03] expressed about heat impacts uh provision of wildlife amenities, [28:08] generator operation which certainly also relates back to noise and air quality [28:13] glare design aesthetic screening vibration which also relates to noise [28:18] and design features. Uh this is not ultimately the category of items that a [28:24] category list of items that we came up with but during the process of kind of [28:28] establishing where the concerns were it was a useful exercise of the TAC. Uh all [28:34] tech materials related to the meetings including meeting notes and presentation [28:39] slides are available on the city's website uh which we will have a QR code [28:44] for later in the presentation uh if you would like to review those. [28:50] So now we're going to shift gears a little bit and talk about the actual [28:53] zoning proposal that that we would like to get your feedback on this evening. [29:00] So when we developed these proposed standards for large scale data centers [29:06] uh we we essentially divided them into five specific categories which we're [29:10] going to talk about individually and then poll feedback on. These include the [29:15] definition, review process and location proposal for large-scale data centers, [29:21] energy and water use and sourcing to the extent that we can regulate it through [29:26] zoning setbacks, environmental compatibility, landscaping and parking [29:32] standards and noise and generator use. [29:38] So during the these presentation slides, uh we're asking or providing the [29:45] opportunity for you to provide feedback on each of these proposals. Uh this can [29:50] be done either through a QR code which will be up on the screen um in just a [29:55] little bit or the paper sheets that some of you have as well. If you'd rather [29:59] provide that information that way, we'll certainly accept it as well. I want to [30:04] emphasize that both of those are the same sets of questions. They will go [30:09] into the same set of documented responses that will be posted on the [30:14] website and also provided to mayor and counsel and the planning commission as [30:20] feedback that we've received on this um on this proposal. Uh there will also be [30:25] the question and answer comment period and then additional time in the lobby [30:29] for uh people to provide further feedback. [30:34] So uh the next slide is really for those of you who want to get into the survey. [30:41] This is the QR code that links to the survey. It's a series of questions that [30:46] we'll go through section by section. Um, if you don't want to do the survey [30:51] online, but you want to provide information, feel free to raise your [30:54] hand. We've got some people out here who can provide paper forms as well if you'd [30:59] rather do that. The first two questions on the online survey are name and email [31:04] address. You are welcome to provide that if you want. We do not require that as a [31:09] required question. If you don't want to provide that, we can simply move to the [31:14] next questions as we get through the process. But that's what you should be [31:19] seeing if you're getting online. Okay. Now, we're going to talk about the [31:24] definition of a proposed large scale data center. Uh, as I mentioned earlier, [31:30] » that slide to accommodate people with disabilities that may not be quick [31:34] enough to get QR code. >> Certainly. [31:36] » Thank you. >> And the QR code will also be posted at [31:39] each set of survey questions. So, if you're unable to capture it here, we can [31:43] capture it at each survey question as well. It's the same QR code. [31:48] Has everybody had the opportunity to capture the QR code? [31:54] Okay. [31:57] So, the next item is the definition of a proposed large-scale data center. As I [32:03] mentioned earlier, defining a large-scale data center is key to [32:06] regulating them. Uh currently we looked at how large the data centers are that [32:12] we have within the city of Tucson and saw a natural break at around 30 to [32:18] 40,000 square ft. And we're looking at those are the smaller data centers that [32:24] we've just seen develop throughout time in the city. And so we wanted to [32:29] establish standards for the larger scale ones that we are seeing being proposed [32:34] elsewhere. And so we established a proposed 50,000 square foot threshold [32:40] where a data center above 50,000 square feet would be classified as a [32:45] large-scale data center. In the definition, we also included a general [32:50] description of equipment and use of the site. We also included language about [32:56] ownership and uh it being part of a facility or multiple facilities um [33:03] establishing this under contiguous ownership. So it's to avoid people [33:07] trying to essentially circumvent the definition of a large scale data center [33:11] by building a whole bunch of smaller data centers in in a line. And so the [33:16] intent of this again proposed language is to uh establish something that would [33:21] allow us to regulate large-scale data centers as they were developed. And we [33:26] will have a question on that on the survey uh once we get through a couple [33:30] of additional slides. [33:35] So in addition to the definition, we would need to figure out where these [33:40] might be permitted within the city. We [snorts] looked at our zoning code and [33:45] determined that our existing I2 industrial zone would be the appropriate [33:50] zoning district for a large scale data center. [clears throat] This is really [33:55] the zoning district that is most intense and it's intended to be for those land [34:00] uses that would provide the greatest impacts uh around the community. As [34:06] such, these are the areas that are located, as you can see on the map, in [34:09] areas with very little development that are far away from the urbanized areas of [34:14] the city. So, we are proposing that data centers be permitted through a specific [34:20] process called the Marin Council special exception, and I'll talk a little bit [34:24] more about that within the I2 zone. So, this would be something that is not by [34:29] right, meaning that somebody could not simply come in and say, I want to build [34:33] a data center. Here's my build. You have my permit application. Approve it. It [34:38] would be a process where there would be a public hearing before our zoning [34:43] examiner who is the uh um quasi judicial reviewer. There would be a neighborhood [34:48] meeting and there would be consideration by mayor and council. So there would be [34:53] steps in the process that would be public for public input on any proposal [34:57] for a data center. Um this is essentially the highest level of review [35:02] that we have for any land use. It's it's kind of very similar to a reszoning that [35:08] would take place within a community. So in addition to doing a merit council [35:13] special exception uh within the I2 zone, we would also consider permitting data [35:20] centers through a planned area development or a planned community [35:23] development which are also very similar to a resoning where there would be the [35:29] neighborhood meeting, zoning examiner review and merit council consideration. [35:34] um those are very sort of project specific where there's a little bit more [35:39] flexibility in the process but also the opportunity for additional community [35:43] benefits. But it's really key to note in in those instances again that there [35:48] would be a public process and mayor and council review. [35:55] As I mentioned earlier, the process either through a Marin council special [36:00] exception or a PAD or a PCD, planned area development or planned community [36:04] development would require a neighborhood meeting. A neighborhood meeting is a [36:09] public meeting where the public is invited to come to hear about the [36:15] proposed data center project or whatever the project is um and ask questions of [36:22] the developer at that point in time. Under our current zoning code, [36:27] neighborhood meetings are required for any Marin Council special exception, any [36:32] PAD or any PCD development. It is part of our process that is baked into all [36:37] land use change. Under the current code for any of those, there's a notice [36:43] requirement of 400 ft from the property line that property owners be notified of [36:48] the neighborhood meeting and the proposed change as well as notification [36:53] of all neighborhood associations within one mile. [36:58] We are looking at propo or we are proposing extending that notification [37:03] area due to the impacts of large-scale data centers as well as their potential [37:09] location in largely rural areas. We're looking at extending that from 400 ft to [37:14] half a mile and also requiring notification of all neighborhood [37:19] associations within 2 miles. And so it's really [37:23] seeking to have a broader notice area for the proposal than we would have for [37:28] for any other type of land use change within the city [37:33] » and the lovely property owners. >> That is correct under the current code. [37:37] But if there's feedback on that, that is certainly feedback that that we would uh [37:41] like to receive from you as well. >> You mean renters don't get notified [37:45] under the current code? >> They do not. That is correct. [37:48] » So they would not be notified under this code. the the property owner would be [37:53] notified and the neighborhood associations would be notified and they [37:56] would have the opportunity to notify their tenants or not. But that is how [38:01] the code is currently structured. >> What about the schools? [38:04] » Schools are property within the notification area and they would be [38:07] notified. [38:16] So the next slide before we get to the survey is the proposed procedure for [38:21] data center review. This is something I've already talked about, but I just [38:25] want to lay it out in a uh diagram because I know it's it's a complex [38:30] process and there are a lot of steps and steps sound similar. So I can certainly [38:34] appreciate um trying to to really wrap your head around what all those steps [38:40] are. But the first one is the neighborhood meeting and that is the [38:43] public meeting where the developer of the proposal would meet with the public [38:48] to provide property owners and neighborhood associations and anyone [38:52] else who comes to the meeting with feedback on the proposal. Uh from there [38:58] an applicant would uh meet with city staff and then submit an application. [39:05] Um there would be again public notice of a zoning examiner public hearing that is [39:10] fully public notice and a public hearing would occur with our zoning examiner who [39:16] is a again a quasi judicial person who reviews zoning cases and then makes [39:21] recommendations to mayor and counsel. Zoning examiner would make that [39:25] recommendation and then mayor and counsel would consider the proposal. [39:30] Mayor and council could approve, deny, or modify a proposal based on feedback [39:36] received. >> Is any of this required to be bilingual [39:40] or interpreted through ASL? >> Certainly any ADA compliance would would [39:45] be met and um certainly bilingual translation is available just like it is [39:50] through all other city processes. >> Is the neighborhood meeting required to [39:55] be in person? in the neighborhood meeting for project blue with just two [39:58] people from the county, one person from the state, and a lawyer for project blue [40:02] because that's the only people who are living anywhere near the area. [40:07] » I really don't know about the neighborhood meeting that took place for [40:10] project blue because it was in the county and so it was not a city process [40:15] that was followed. But that really speaks to our intention to expand the [40:20] notice area in the proposal for exactly that reason because if there's nobody [40:24] that lives within the area, we want to notice a larger area to ensure that. [40:33] Okay. Um so the next slide is back to the survey. If you'd like to provide [40:41] feedback on the next section of questions, these relate specifically to [40:47] the definition of large scale data centers and our notice requirements. And [40:52] I can come back to the definition slide for a minute or so if people would like [40:58] to review that again and provide any feedback whether you believe this [41:03] definition um essentially goes far enough or needs to go further. And if [41:08] you have any written feedback on this definition, uh that will certainly help [41:12] us to receive that as well. [41:32] » Oh, certainly. Yeah. Hold on. Here we go. [41:39] Have you considered expanding the notification [41:43] range because the sound profile of data centers is so much different and and [41:48] propagates so much farther especially in this particular climate to capture more [41:53] people that are affected. >> I think that's certainly something that [41:56] we consider and I would encourage you to place that in the comments as well if if [42:00] you believe that that is important. [42:04] Back to your definition of large scale, have you considered putting an upper [42:09] limit to this definition? So then you know we [42:14] don't have a medium acre data center. I [42:19] » think that's something again please provide feedback on that that will be [42:22] very helpful for us to receive as well. [42:32] Okay. [42:36] » So, the next question really goes back to the the process for allowed zones and [42:43] also the review process. Uh, so we certainly ask for feedback on the review [42:48] process of the proposal of notifying to half an half a mile property owners as [42:53] well as two miles to neighborhood associations. Do you feel that's [42:58] adequate? If you have any other feedback to provide um please write it in the [43:02] survey or on the sheet um so that we can document that as well. [43:18] » Certainly >> go back to the one where it says 50,000 [43:22] square feet. So if they build something 49,000 square feet, they don't have to [43:28] go through this process. >> That would be correct. It wouldn't meet [43:31] the definition of a large scale data center, but that's part of the reason [43:35] why we are looking at 50,000 square feet and we weren't looking at 100,000 square [43:40] feet or something like that because [43:44] » we we certainly looked at that as well and and there there are challenges from [43:48] a zoning standpoint of regulating that, but please provide that feedback as [43:52] well. Oh, we will >> again and again and again. [43:59] » Are answers to the survey going to be made public? [44:01] » Yes, they will all be posted online on the PDSD website, provided to mayor and [44:06] council and provided to the planning commission. [44:11] » So, the input that we provide, questions and clarification that are requested, we [44:18] indicated that a committee or a group are going to compile it to the convey it [44:24] to the mayor. Is there going to be any representation from someone outside of [44:32] the city um group included in conveying that? Because there could be a conflict [44:39] of interest. Um we don't really have representation as to how the data is [44:44] manipulated or conveyed. So actual verbatim comments for [44:50] everything that we received will be conveyed. We may provide an overview of [44:55] the number of comments received or even categories but the actual if you will [45:00] metadata of every single specific comment that we receive whether it's [45:05] through the survey through comments in the registration through post-it notes [45:09] that were posted out in the lobby through chat comments that we've [45:13] received from the online meetings. Um, it's any other comments that we receive, [45:18] emails, those will all be provided to mayor and council in a single document [45:23] as well as the planning commission. [45:34] People uh have an opportunity to answer the survey questions specific to this. [45:39] I do want to say also that the survey will be left open for some time. So, if [45:44] you don't get it tonight, you can come back and provide additional feedback as [45:47] well. [45:52] » Yeah. At this point, I'm going to turn it over to Dan Versk, who's going to [45:55] talk about energy and water use. [46:07] » Great. Um, thank you, Carver. Thank you everyone for joining us today. Really [46:11] appreciate it. I do want to point out one quick thing um that might make it a [46:16] little easier for people who are following along using the QR codes. So [46:19] this QR code goes to uh the survey, but it's the same QR code every single time. [46:25] So if you keep that page open, you're able to kind of follow along. So you can [46:30] potentially if I go to the next slide, you could put it in your comments as I'm [46:35] speaking. Um, and it'll keep you keep us from having to jump back and forth and [46:39] having to remember kind of what we're going going over the specifics of it. [46:44] So, just a little tip. Um, might help with some of the logistics of the [46:49] survey. Um, but as well you also have the opportunity for the the written ones [46:54] which is exactly the same. >> Excellent. Great. So, um, wanted to talk [46:59] a little bit about energy and water. Um as uh Corin and Carvin Carver had [47:05] mentioned earlier um these are two items that um zoning really um is very limited [47:11] in what um can be regulated through these which is part of the reason why [47:16] you know we're looking at things like the large water uh large quantity water [47:19] use ordinance and other methods in order to really try to address these things as [47:24] we know they are very important to the community and very important to to the [47:27] city of Tucson. And so um related to energy consumption and sourcing um we do [47:34] have um some regulations and things that we are proposing related to this. We [47:40] definitely want to get your feedback on this. Um, but the idea here is to [47:44] provide information, public information that would be part of the application, [47:49] part of the materials that make its way through through the review and to mayor [47:53] and counsel so our mayor and council can make really the best decision possible [47:58] and have all the information that they need in front of them. And so the idea [48:02] here is that every applicant that if they were to come in, there are no [48:07] applicants that have currently come in that are in um but demonstrate access to [48:12] adequate energy supply at the time of the application. And so they have to [48:16] show that through disclosure um that they have adequate energy um supply at [48:22] the time of application. It's not something to where there is an adequate [48:26] supply and then all of a sudden infrastructure has to be created leading [48:29] to rate increases and things of that sort. Additionally, um the applicant [48:34] must disclose proposed amount of energy, energy mix including renewables and [48:39] application materials related to this. So again, you're providing all of that [48:43] information so you can make that decision. Um again, mayor and council, [48:47] this is part of their decision-m process. Um they don't have to approve [48:51] this. They can approve this, deny this. they could uh ask for additional [48:55] conditions uh related to that based off that information. So again, putting the [49:00] information in front of the public and front in front of our mayor council so [49:04] they can make that decision. Um related to kind of water use um we have a little [49:09] more leeway on this one um as far as what we can regulate and what we can do. [49:14] Um but it's just not necessarily within zoning. Um, so what pretty much anything [49:22] that any applicant that comes in must comply with the city's large quantity [49:25] water user ordinance um if a Tucson water um customer and Scott had talked a [49:30] little bit about this earlier, but it requires a water conservation plan. Um [49:34] recycling water requirements impossible um and really require it and requires [49:38] monitoring and compliance. um if they don't comply with it, there are um [49:44] pretty steep penalties um as far as related to this um and and [49:50] and for that. Um so if they don't fall within that however um which would be [49:56] that 10,000 CFS that's got talked about um they would be um required or actually [50:04] we would it'd be required to meet that the the the standard that is basically [50:09] prohibiting the use of portable water. So they wouldn't be able to utilize [50:12] portable water for data center cooling um if they weren't subject to the large [50:17] quantity water use ordinance. Additionally to this um similar to the [50:21] energy um they would be required to demonstrate access to water supply at [50:26] the time of application as well. So yeah bringing all that information making [50:30] sure that all that information makes it in front of mayor and council so they [50:33] can make um a decision and understand kind of what's in front of them. All [50:37] that information would be public. It would be submitted at the time of [50:40] application early on in the process. So it's available to the public. It's [50:43] available to the zoning examiners. It's available to staff. It's available to [50:46] everyone. Um, we have a couple questions. I'm [50:50] going to hold up for a second. Um, hopefully. Yes. [50:55] » Will there be a requirement that they have some percentage of renewables [51:01] or recycled water usage? >> Um, so there it's a great comment and a [51:10] good one to submit and let us know. Um, as of now in the proposal, there are not [51:15] a requirement for a percentage of renewable or or a percentage necessarily [51:19] of recycled water. Um, they aren't allowed to use utilize portable water. [51:23] Um, if they're under that and then that would be probably part of the water [51:27] conservation plan if they were to do a large quantity of water user ordinance, [51:30] right? >> Why not? [51:33] » Um, >> that is that is why we are in front of [51:36] you to get feedback related to that. So, that's that that is helpful. We [51:39] appreciate it. Um, [51:41] » you mentioned state penalties. Could you elaborate on that? How big of [51:47] a second? [51:50] » Um, related to that, I and and Scott and Chris. [51:57] You know what we'll do? We'll look it up and then when we're doing Q&A, I'll make [51:59] sure that we respond to that. Um, and make sure that, you know, it's it's [52:02] pretty steep and it gets it multiplies as you have more less and less [52:08] compliance over time. I can get those numbers [52:10] » dollars. How are you going to They just cut you a check. How you going to How [52:14] you going to counter that when somebody has millions of dollars will just be [52:16] cutting your check? It's already happening across the country. [52:20] » Anyway, so um I'm going to have to move on, but we will have Hold on one second. [52:24] I'm going to I will let >> Chris will come up and talk real quickly [52:28] about this because he has the details related to it and then then we'll have [52:33] to move on. >> Just to clarify, if they're using more [52:36] than 7.8 million gallons per month since they can use more portable water. [52:41] » Um, it would be a part of their water conservation plan. In general, they have [52:46] to offset all of that water use, but [52:52] » my name is Chris Ary. I work at the Tucson City Attorney's Office. I'm going [52:56] to answer the question about water use penalties in the large quantity water [53:01] user ordinance that's been adopted by mayor council. There are of course some [53:06] u financial penalties that occurred to folks who violate the slaughter [53:11] conservation plan that they submit as part of the large quantity water user [53:15] ordinance. But at the end stage of that there is the ability of the city to um [53:21] enact flow restrictions or to restrict the water use manually and there's no [53:26] amount of money that can um stop that. So I just want to point that out. Um, as [53:32] far as offsets, again, what we're asking for in the large quantity water user [53:37] ordinance is for applicants to demonstrate the most efficient use of [53:41] water for the technology that they have and to also site their uh facilities in [53:49] areas where there's proximity to reclaimed water if possible and to use [53:54] as much reclaimed water as they can. Um, there are different perspectives about [53:58] that and we'd love to hear your comments about whether you think [54:02] these large facilities should use portable water or reclaim water or both. [54:06] » Can you tell us where that valve is? We won't tell anyone. You told us [54:09] [laughter] [54:12] » which I did not understand that question. [54:18] » Who gets to decide when the water gets shut off if a large water user goes too [54:23] far? So the the language in the large [54:27] quantity water user ordinance doesn't talk about shut offs. It talks about [54:31] flow restrictions. So they ask a large quantity water user will be submitting a [54:36] water use plan and if that plan is not met then we will meter the usage so that [54:42] it complies with that plan. >> Who determines how much reclaimed water [54:46] they should be using? Who decides what what's the best? There are a set of [54:50] recommendations that are made on that in that respect by the city of Tucson water [54:55] department director and some of that is related to proximity to the reclaim [54:59] system but ultimately it's a mayor council decision. [55:07] » Great. Thank you Chris. I appreciate it. Okay. Um moving on and we will have Q&A [55:11] at the end. Just want to let everyone know um where we'll have the opportunity [55:14] to be able to uh provide comments, ask questions, etc. [55:18] Um so talk a little bit about proposed setbacks and this is something we've [55:23] gotten a lot of feedback on so far and we do really appreciate a lot of the [55:27] feedback um especially related to kind of noise impacts and things of that [55:31] sort. So um in the proposal that is in front of you the one we've that we've [55:35] that we've put in front of you um we have a required 400t setback from data [55:41] center use uh to urban residential areas and noise sensitive uh areas such as [55:46] schools. Um and additionally we have uh a required 200 foot setback um from data [55:54] center use to commercial or office use is just understanding that the [55:58] incompatibility of these of these facilities um really related to [56:03] commercial or related to office especially related to residential um is [56:06] not there and so this is intended to make sure that it's set back. We've [56:10] seen, you know, a lot of situations up in um the Phoenix area where they didn't [56:14] have regulations in place um for this and we have data centers right across [56:19] the street from a lot of residential neighborhoods. Um they've measured you [56:23] know heat impacts and noise impacts and things of that sort and this is really [56:26] intended to um to mitigate some of that. Um we've had we've had several comments [56:31] related to uh you know whether this is enough or not. Um we do really [56:36] appreciate that. It's something we will be looking at. um as far as looking at [56:40] potential revisions to um as we move forward um with this proposal. Um so [56:45] that that's the current proposal um uh that we have kind of in front of you um [56:50] related to proposed setbacks um as well for this [56:55] um related to that uh there is a question in there related to that [56:58] whether it's um appropriate or not um as well as you know open-ended question to [57:04] be able to provide your comments. Huh? >> Two questions. How come the slide [57:09] doesn't have the same amount of stuff on it as the sheet? The sheet has two more [57:13] items, landscaping. >> Oh, yeah. We're uh we'll be talking [57:17] about that in a second. [57:21] » We're already within the times for community questions. It's 7:30. [57:24] » Yeah, we're we we're almost there. Okay, we'll be there. Okay. No, we [57:29] » How come the notification thing is is so large, but that setback is only 400 ft? [57:35] I mean, that's nothing. >> Nothing. [57:37] » That's so tiny. That's not a quarter of a mile. [57:40] » Yeah. [57:44] » Good things to comment on. We will take your feedback related, but we are [57:47] looking at it. So, we appreciate it. [57:56] » I'll let you know. Okay. A couple of other things that zoning can regulate. [58:00] Uh, one of them being um noise. >> What's your name? [58:04] » Regulation. My name is Nick Martell. >> Thank you. Um, so our proposal right now [58:09] is to require a independent noise study that measures sound levels and tone. Um, [58:15] that's something that would be in that 5565 decel area when it reaches a [58:19] property line. So on the outside or the actual property line between um the [58:24] proposed data center and any other land use. Um the other thing would be to set [58:29] clear noise limits on that property line like I just said with those decibb um [58:33] and then require sound walls or roof screening around generators um and then [58:39] other loud equipment. So that's just to kind of uh a to block some of the uh the [58:44] uh generators and some of those other visual aspects of it and also to block [58:48] some sound. [58:53] Is there any accommodation on that on the decel level for duration? Because [58:58] even though it's 50 dB, 50 dB at a constant 247 [59:04] pace has a different effect than just checking for a single. [59:08] » So I believe that would be covered in the sound study that would be required [59:11] for this. >> What what waiting scale are you using to [59:16] the sound? a waiting specifically derates the sal of these facilities. [59:21] » I'd have to get back to you on that one. [59:26] » Okay. Uh some proposed regulations for generator use. Um so generators are part [59:30] of data centers in terms of backup power usually. Um so our proposal would be to [59:35] use cleaner high efficiency generators such as tier 4 or natural gas or dual [59:40] fuel. Um battery backups would be used first during power disruptions. So if [59:46] there were a power disruption to use that backup uh battery first before [59:50] getting into generators. Um there would be no load shifting allowed which is the [59:54] uh running of generators instead of using grid power. Um and then generators [59:59] run only during emergencies or required maintenance. Um and then that would be [1:00:03] non-emergency uh maintenance would only be limited to 9 to5s on weekdays. [1:00:09] » Who's going to regulate that and and how do you file complaints if they're not in [1:00:14] compliance? So this would be regulated through our code enforcement. Uh code [1:00:18] enforcement, you have a website, you can use um 311. There's several ways you can [1:00:22] call code enforcement. >> Who monitors the load? [1:00:26] » Sorry. [1:00:30] » Um that would just be a regulation and if they were out of code with it, then [1:00:33] they could be issued a violation. >> How would anybody know they were out of [1:00:37] code? >> That would be up to our code enforcement [1:00:39] department to enforce. >> Teen will take care of that. [1:00:43] » All right. I will leave this up for one minute um just in case nobody got it and [1:00:49] then I'll move on just a second. >> I'm going to go back to the compliance [1:00:54] thing again. These guys have billions of dollars. So what are you going to do [1:00:58] when they just keep cutting you a check and they keep violating stuff? You going [1:01:02] to shut them off? You going to tell them to get the hell out? You can't do [1:01:05] anything. You don't have the money against these companies. Why are you [1:01:09] guys not thinking about this? >> Thank you for that feedback. that stuff [1:01:12] we would love to hear. Okay, moving on to proposed landscaping. [1:01:18] Um so one of the proposed landscape um items here would be to require an [1:01:22] enhanced landscaping border of 20 ft. Um that would be around the property line [1:01:26] that helps eliminate some visual aspects of these data centers. It also um [1:01:31] provides areas to provide um low water plants um uh desert plants for desert [1:01:38] landscaping. Um and then to define a minimum parking ratio. That's also one [1:01:42] of the aspects of zoning. Um a lot of these do not require a lot of parking [1:01:46] and so we would not be requiring a lot of parking for them to use it. Um kind [1:01:50] of limiting imperous surfaces at data centers. [1:01:55] » So there are no jobs. [1:01:59] » Cool. Thanks. >> Okay. Environmental compatibility. So we [1:02:04] are going to utilize some of our existing standards. Uh we are not [1:02:07] proposing any changes to environmental compatibility. Uh we would require [1:02:11] applicants to adhere to any overlays such as the environmental resource zone [1:02:16] um the wash overlays the water course amenity safety and habitat zones. They [1:02:20] would have to utilize commercial rainwater harvesting and hillside [1:02:23] development standards. [1:02:27] This includes protection of existing aoyos and washes. Uh the use of low [1:02:32] water and drought tolerant plants. Uh as well as a requirement of harvesting 50% [1:02:37] of total landscape water demands. Um just then touching on some of those uh [1:02:42] desert landscapes that I was talking about. Um and then utilizing an existing [1:02:45] airport hazard district uh requirements on glare. A lot of our I2 zones are [1:02:51] pretty close to the airport. So they would have to comply with all airport [1:02:54] environment zone uh requirements. >> Okay. On that last point, what where [1:02:59] would I find Can you go back? >> Uh where would I find those standards? [1:03:04] The state standards. >> These are in our unified development [1:03:07] code. These would be in the overlay section of the UDC. Um if you would [1:03:11] like, I can talk to you afterward and show you if you'd like to see them. [1:03:17] » Okay. Um going to give you another minute if you would like to put any [1:03:21] feedback in for those landscape parking and compatibility. [clears throat] [1:03:36] » Then no need to go back to the good [1:03:52] All right, we just have a couple more slides before we can get to the question [1:03:56] and answer comment section. U just wanted to emphasize I already covered [1:04:01] some of this opportunities for further input and discussion. This QR code is [1:04:06] for the PDSD website where information is going is all posted. Uh, as I [1:04:12] mentioned earlier, we're looking at probably a mayor and council special or [1:04:16] a study session in April and then to be determined on planning commission study [1:04:21] session, planning commission public hearing and merit council consideration. [1:04:26] Uh, we also have a um FAQ document that we are continuing to [1:04:33] update and it's posted to the website. Uh, this is again the process uh that we [1:04:39] outlined earlier. you've already seen that. Um, and so now we're getting set [1:04:44] up for the Q&A section. Uh, microphone is being set up by Cesar. Uh, please [1:04:50] line up behind the microphone to speak. Uh, we ask that you please be succinct [1:04:54] and speak for no more than 60 seconds so that we can ensure that everybody has an [1:04:58] opportunity to speak wishes to. And your questions during this Q&A uh, session [1:05:05] will be included on the record of public input. um these are being filmed and [1:05:10] these will be documented and sent to parent council and the planning [1:05:13] commission as well. [1:05:17] » Okay, great. So, we have about 20 minutes for Q&A. Again, no more than 60 [1:05:22] seconds. We want everybody to have a chance their chance to to ask questions [1:05:26] or speak. >> Can you give us [1:05:32] » the full 30 minutes? >> Well, spoke pretty slow. So, [1:05:38] So, um, Colleen is holding going to hold up cards to remind you of your seconds. [1:05:44] Um, we know that in public hearings, you get three minutes. This is one minute [1:05:48] because this is not a public hearing and we want more people that have a chance. [1:05:52] So, um, and Cesar will be making sure that you also know when it's time to [1:05:58] stop, but we really value your comments. So, go ahead. First, let's hopefully the [1:06:02] mic is working. >> Yes. Hi. Uh, my name is Vake. I'm a [1:06:06] member of the no desert data center coalition um can you bring up the slide [1:06:10] of the map please with the with the I2 zones. Um and while that's happening um [1:06:15] I encourage everyone here to leave comments that say prohibit large scale [1:06:20] data centers. I think we've heard tonight that whatever restrictions there [1:06:23] are incredibly hard to enforce if at all. Um and so please do say just [1:06:28] prohibit large scale data centers. It's not up to us to explain how to do that [1:06:32] legally. It's up to our city staff to figure that out. Um so if you do know [1:06:37] that though, please let them know. Um so this map, the purple area is the large [1:06:42] is the um heavy industrial area to the south of the airport. If you see that [1:06:46] little carve out south of that purple area, that's Summit. They have no uh [1:06:51] representation in the city of Tucson, but they are 80% Latin. And they border [1:06:55] the largest section of industrial, heavy industrial. You can see the western [1:06:59] border there is the San Javier district of the Kona nation. So these are folks [1:07:04] who are disenfranchised by these data centers and that's the heaviest [1:07:07] concentration right there. This is environmental racism. [1:07:15] So hi, my name is L. I'm here to represent myself as a geoccientist from [1:07:18] the University of Arizona and I'm also here as a member of Tucson Red Action. [1:07:23] Uh our group has made a list of demands and I'm just going to go over that real [1:07:26] quick. Our first one, a complete dedication to the not one drop policy. [1:07:31] This includes uh water and it's been amended to be an airbased project. We [1:07:36] want to include that also all natural resources including petroleum, gas uh [1:07:41] etc. Um our second demand uh we want a commitment to the prohibition of any [1:07:48] data center. Um we demand that the city at every stage if you have spoken that [1:07:54] you are only able to control this from a building code standpoint. Um all the [1:07:59] other groups um need to work with you to make sure that no data center can be [1:08:04] made. Uh and most importantly we want a seat at the table. Uh this TAC board [1:08:09] lacks proper representation by the people who will be affected most. We [1:08:14] want energy experts, water experts from nonprivate, non um for-profit [1:08:20] organizations along with gender and racial tribal voices. [1:08:24] » Great. >> And I'll just like if you have written [1:08:29] comments for this this opportunity at the mic, please also submit those in [1:08:33] writing. [1:08:36] » Um my name is Reyes or doesn't really matter. Um, but if I go home and I turn [1:08:41] on the faucets in my house, um, I will be shut off water eventually. So, why [1:08:46] does this standard not, you know, follow liquid status centers? [1:08:50] » Y, >> our water is our most precious resource [1:08:52] in the desert. And they're already talking about cutting us off from the [1:08:55] Colorado River water. Um, and the second point is the last time I was here that [1:09:00] your tag group of experts, none of them were explicitly against data centers, [1:09:05] which you have a bias in there. If you have true expertise, some of them would [1:09:10] lead to the fact that they don't believe data centers are are a viable option in [1:09:13] our desert. You're picking first on if these people are pro data center and [1:09:17] then decide their expertise among them. It's not fair. Um, finally, there needs [1:09:23] to be a prohibitive uses of this data center. There is obnoxious uses such as [1:09:27] immigration enforcement and mass surveillance. Um, that needs to be [1:09:31] [applause] [1:09:38] My name is Kathy Thompson. Um, I'd like to quantify what an actual need is. We [1:09:44] don't need a data center. We need schools. We need hospitals. We need [1:09:48] homes. We need food distribution. We [applause] don't need data center all of [1:09:53] our use to just sell us more crap. It's going to end up in the landfill. Um [1:09:59] these companies are rushing to build these data centers because the private [1:10:03] capital is drying up. Companies like Blue Owl, Apollo, they have seen great [1:10:08] drops in their stock prices recently. They they are just rushing to just take [1:10:12] advantage of communities. Um I'd like to also find out if you're going to find [1:10:17] for excess water use, what are you going to do? Go to the Midwest or the [1:10:21] Northwest and buy more and ship it here? I mean, the fine doesn't do anything. [1:10:25] The water is a precious resource for life. It's not for this technology [1:10:30] behemoth that we're going to look at in 10 years and say, "Who the heck let them [1:10:34] build that thing?" [applause] [1:10:42] Hi there. My name is Melissa Westbrook. Um, number one, looking at that panel, [1:10:46] it looks about white. Uh, [laughter] secondly, um, this thing has grammatical [1:10:52] and one very glaring numerical error. If you need someone to proofread, I used to [1:10:56] be a proofreader and editor. Um, I will say to you that again, we do need to [1:11:02] understand why are we building these things? Why this rush for AI? It's [1:11:09] dangerous. It's dangerous in our public schools. And that's my area of [1:11:13] expertise. So, I don't I grew up here. I'm a pr proud wildcat. Water is our [1:11:21] most precious resource. We are not going to give it away. We don't have it. The [1:11:28] Colorado River, you guys have got to Somebody's got to put the brakes on. If [1:11:33] it's all about money, I got you. If it's all about money, hey, [1:11:40] [applause] [1:11:46] my name is Aiden. I'm a member of local IU 140 or I local 140. Uh, I just have [1:11:51] two things to say. one, as far as I can tell, AI has been used to power the [1:11:56] worst elements in our society just over and over again. I can't see any real [1:12:00] reason that it would be a benefit to our city to have one of these data centers. [1:12:03] On a more procedural point, uh I have experience working with a lot of large [1:12:07] corporations. They're going to violate your policies. They violate policies, [1:12:11] safety policies, environmental policies constantly and with no regard. And so if [1:12:16] your first thought is not how are we going to prevent them or stop them when [1:12:21] they do violate these policies, you're looking at it from the wrong [1:12:24] perspective, you're you're not going to stop them from using too much water or [1:12:27] too much power or too much whatever. They do it on a regular basis. They will [1:12:31] easily put their employees at risk. They'll take the blood out of your veins [1:12:34] if you let them. And so if you're not looking at them as your enemy, you're [1:12:37] looking at this wrong. [1:12:41] » [applause and cheering] [1:12:43] » HI, MY NAME IS DIANE Rosia and I'm a proud Tucson of 56 years and I'm a [1:12:48] realtor. So, I house people here in our city. I have a question. [1:12:54] Since Tucson already has a data center operating within the city limits at [1:12:59] roughly 40,000 square ft of raised floor space, why wasn't that considered [1:13:05] sufficient reason earlier to review whether the land use codes should [1:13:10] address impacts such as setbacks, energy, water use, environmental [1:13:15] compatibility, noise and generator use, and appropriate zoning before future [1:13:20] applications arise. [1:13:24] » [applause] >> have an answer before the next comment. [1:13:33] » Okay, sorry about that. Um, yes. So, honestly, we hadn't heard any concerns [1:13:38] related to that and it wasn't until we heard concerns from the public that we [1:13:43] really needed we needed to go in and actually create regulations related to [1:13:48] this and look at those attacks. And so that is the reason why those data [1:13:52] centers were just functioning within industrial areas and it really we hadn't [1:13:58] had any complaints by neighbors around there or anything else. That's the [1:14:01] reason why until this point we hadn't. [1:14:08] » Hi guys, it's April. I wanted to bring up two things. When my neighborhood [1:14:14] wanted to install a traffic calming device with a grant in our neighborhood, [1:14:19] we had to get signatures from 60% of the residents on that street. [1:14:26] And yet, these proposed notifications are actually nowhere near [1:14:32] the amount that should be compared to something like a community trying to get [1:14:37] a very real benefit like a traffic calming. Secondly, I know that we know [1:14:43] as people who have code and write code and deal with code in Tucson, we know [1:14:48] how to make land uses prohibited. We know how to make it prohibited for [1:14:55] shelters, for rehabs, for many other actual useful land uses. And that's why [1:15:00] Mayor Castle just had to declare an emergency around homelessness to get [1:15:05] over those codes. I encourage you to learn from what you do well already [1:15:10] [laughter] and apply that to this situation. Thank you. [1:15:19] » Hi, my name is Reed. Um, I'm I'm tired. I'm tired of this. I'm tired [1:15:27] of coming to these meetings. I'm tired of saying the same things over and over [1:15:31] again to the city officials, specifically mayor and council, who do [1:15:36] not appear to be listening. Why should we expect mayor and council to listen to [1:15:40] you or to listen to the feedback that we have given you when they were spending [1:15:46] they spent a couple years before they told anyone about project blue working [1:15:51] behind the scenes to make it happen? They were meeting regularly with Amazon [1:15:55] every few weeks. I think 2024, 2025 to get advice from Amazon about Arizona [1:16:02] water law and they never thought to tell the people of Tucson. These are the [1:16:06] people you're reporting to. My question for you is, how are you, given that [1:16:12] betrayal, how are you going to get them to listen to you? How are you going to [1:16:16] get them to listen to us? Cuz I don't have any faith that they will. [1:16:21] [applause] [1:16:26] Hi there, Derek Espalos. I am an accountant, a data analyst, and a [1:16:30] current candidate for the Arizona Corporation Commission, which I can [1:16:33] assure you is not going to protect anyone from anything that happens. So, I [1:16:39] have three questions. I'm just going to throw them out there. Why should we [1:16:43] trust this process? Because there, as was just mentioned, we've been through [1:16:48] this process. We keep going through this process and no trust is never [1:16:52] established. The second question is, are you going to disclose how you're [1:16:57] scraping and putting together this data? Because having the binary options mixed [1:17:02] with the comment option leads to a lot of statistical bias. And finally, when [1:17:08] will [clears throat] Tucson understand that no means no? [1:17:11] » No. [1:17:14] » Response before the next. >> Yeah, I want to respond to that question [1:17:17] and the previous question about the process and where is this feedback [1:17:20] going? How do you know this is going to be listened to? So, our mayor council is [1:17:25] very interested in the feedback from the public and the technical advisory [1:17:29] committee. That's actually why they put a pause on project blue last summer so [1:17:34] that we could have a broader community conversation about what are the [1:17:38] safeguards we need to have in place for our community as these uses are [1:17:41] proposed. So, I think it's exactly in reaction to what they heard from the [1:17:45] community that they directed staff to make sure we have protections and guard [1:17:50] rails in place for our community. So, that's their intent with this process. [1:17:54] Um, and we will be taking all of this feedback to mayor and council in the [1:17:58] next month or so um to give them an update on what we've heard so far and [1:18:04] give them an opportunity to provide additional feedback and direction. [1:18:13] Hi, my name is Leilani. Um, a comment and then a question. Um, under the [1:18:19] location and design section, I believe there was a bullet that said the [1:18:25] applicant would propose the regulations. I find that comical. Why would we afford [1:18:32] the applicant the right to propose the regulations? I don't know if you're [1:18:38] looking for feedback on how we should incorporate or mandate the process as [1:18:46] well as the feedback on the impacts. Um, and then also with regards to the [1:18:53] penalties that have been assessed, I'd like to know over the last 10 years what [1:18:59] the financial penalties that have been assessed. He didn't mention, Chris did [1:19:04] not mention uh and because we know there no one's [1:19:08] monitoring it. Um and that would show that it would support that no one's [1:19:14] monitoring it. So the financial penalties I'm curious what that amount [1:19:18] is. Um yeah, I know. But um >> you're good. [1:19:24] » Okay. >> Yeah. Okay. Um with regards to the [1:19:29] applicant demonstrating the access to energy Okay. Okay. Go ahead and respond. [1:19:35] » I'll get back in line if there's still by the way I'm happy to speak and talk [1:19:40] through the details of some of those. I'm not entirely sure about the um [1:19:45] applicant proposing. Um I will say related to the large quantity water use [1:19:49] ordinance. It was just put in place in August and as Scott has mentioned [1:19:53] previously um existing there are no uh large quantity water people that would [1:20:01] actually qualify for that that are on the portable system and the only ones [1:20:04] that are really in the in the city. There's only a handful and they're on [1:20:07] the reclaimed system as of now. And so that kind of gives you an understanding [1:20:12] of how large of the that threshold is, but it also gives you an understanding [1:20:16] of kind of the reason why there wouldn't be any penalties because no one is [1:20:19] actually a part of that program at this point. [1:20:26] » Good evening. Thank you for taking my question. My name is Albert. I am a [1:20:31] retired uh environmental biology teacher. And [1:20:35] one of the things I used to teach my students when it became the topic of [1:20:40] water was the concept of water mining. And most people don't understand what [1:20:46] water mining is. So I'm going to address you guys. That is when you take more [1:20:51] water out of the ground than reflections. There's nothing in a hole [1:20:55] and pumping water. Just water was limited by 2025 by law to stop water [1:21:02] mining. And that's why we started blending cap water. Any development in [1:21:08] town has to be a guaranteed 100year water supply. How is billions of gallons [1:21:15] a month going to guarantee that this data center will will have enough water [1:21:22] supply for a 100 years. And how are we going to do that without water mining? [1:21:28] That would be my question perhaps for the lawyer of Susan. Thank you. I think [1:21:34] the [applause] change [1:21:39] 2030 used to be 2025. [1:21:46] [clears throat] >> All right. [1:21:49] » So to help answer that question, one of the requirements of the large quantity [1:21:53] water users policy was that they do have to fall within our assured water supply. [1:21:57] So that is one of the requirements that we would look at to make sure that we're [1:22:00] not going above and beyond. Um so that is one of the things that we have that [1:22:04] much water in the desert. >> We have that much water. [1:22:09] » We have a very resilient supply as of right now. [1:22:18] » Okay. I want to let you know we have our hard stuff at 8 because we have to leave [1:22:23] this room. It will continue in the lobby and staff will stick around for at least [1:22:27] a half an hour and can talk individually with all of you. So, let's continue. We [1:22:32] can get in hopefully three more people. >> Hi, Elena native Tonan. Um, I want a [1:22:38] future in Tucson, which is why I'm here. Um, I just want to add my voice to the [1:22:44] many voices here who are asking to see more prohibitive zoning that would [1:22:48] actually prohibit hypers scale data centers in the city t of Tucson limits. [1:22:53] Um, I see some of the efforts in the proposed code to mitigate harms um from [1:23:00] this development. I appreciate that and frankly it's just not enough. Um, I [1:23:05] think we're still seeing that communities are facing disproportionate [1:23:09] harms while we don't really get to see any of the benefits, frankly, of these [1:23:13] projects. Um, I have major concerns about enforcement and monitoring. Who [1:23:18] does this? Is this sufficient? Particularly, as folks have mentioned, [1:23:22] for companies that are making billions of dollars. Um, you seem to imply in [1:23:26] some of your answers and some of what I saw written that it's up to the public [1:23:29] to like call in. Um, so anyway, I want to understand the enforcement and the [1:23:33] monitoring mechanisms. Um, how do data centers fit into plan Tucson and how [1:23:40] you're prioritizing economic development in the city? A plan Tucson general plan [1:23:46] is a reflection of a city's values. Is like, do we value this? Is this within [1:23:51] our values? Is this something [1:23:57] [applause] [1:23:59] about us? Hi. Um, I am not an expert in anything [1:24:03] unfortunately. Um, I just had a couple of like facts that I just kind of [1:24:07] Googled really quickly. Um, so that's a quick quick Google search. Um, you can [1:24:11] see that AI in 2025 used about give or take 3 312 to 764 billion water liters [1:24:19] of water this year, last year alone. And it's projected that in Phoenix um, data [1:24:24] centers could consume up to 3.8 billion gallons of water per year. Tucson [1:24:28] doesn't have that kind of water. Do we want the water to go to people in [1:24:32] communities or do we want it to go to data centers here? Yep. [applause] [1:24:39] » Hi, my name is Brandon. This might be normally where I take do the courageous [1:24:43] thing and thank you for hosting this meeting, but we're not thankful that we [1:24:46] have to keep coming out to these meetings and talking to you guys. Last [1:24:49] summer, we told you we don't want a data center in the desert. It does not make [1:24:52] sense for us. no matter what regulations you put on the screen, um it's just not [1:24:56] right for the desert. It doesn't make any sense here. Um and instead of [1:24:59] listening to us, you guys have jumped to this inevitability that the data center [1:25:03] has to be here. So, let's just go ahead and figure out how we're going to [1:25:05] regulate that. >> They're not inevitable. [1:25:07] » They're not inevitable. That's what we're here to tell you. We don't have to [1:25:10] have a data center in the desert. It doesn't make sense to do it. The first [1:25:13] question on your frequently asked questions flyer is, can we prohibit a [1:25:16] data center from being here? >> Yeah. [1:25:18] » Instead of answering that, you've just told us what a data center is. If you [1:25:21] look at that, the question should be, "What is it actually?" You didn't answer [1:25:23] the question. Um, but I think in one of your slides, you maybe did because it [1:25:27] says that the city is able to control land use. [1:25:30] » Yeah. >> So, instead of having these regulations [1:25:32] and these conversations, how about we stop stop and talk about how we're going [1:25:36] to not have a data center here. It does not make sense. [1:25:41] [applause] We'll take the last question, but I [1:25:44] think it should be noted that there's a complete error in the response to the [1:25:48] first question. That's not actually the response. They just discovered this. [1:25:52] Final question for comments. >> Hi, my name is Lee and my question is [1:25:57] why was TEP allowed on the technical advisory committee when they have a [1:26:01] vested interest in building data centers? [applause] [1:26:05] The for-profit company, the Canadian company that owns TP said they plan to [1:26:09] spend$ 1.5 to2 billion on additional generation. So, it seems like we [1:26:14] shouldn't have someone with a vested interest guiding this. Um, I also want [1:26:17] to know if you're looking at all about the connection of this map and [1:26:20] environmental racism cuz these seem like the communities like on the southside [1:26:25] that have been poisoned for generations and generations. So, if you're not going [1:26:28] to put one in the foothills, I don't think you should put a data center [1:26:31] anywhere in the final question. Why is there so many [1:26:35] police here? This is a community meeting. It feels like to have a whole [1:26:39] line of police here. So, >> yeah, I would really like to look at [1:26:43] facts to include environmental justice and the history of of pollution in [1:26:47] Tucson. Thank you. [cheering] [1:26:51] [applause] [1:26:54] » We really need all the feedback. Thank you for sharing your concerns, [1:26:58] questions, and input in this process. It is definitely going to shape what we [1:27:02] take to Mayor Council and where this process ultimately goes for our [1:27:06] community. So, thank you all for being here tonight. We will be around um in [1:27:10] the lobby for more questions and discussion if folks have more time and [1:27:14] more questions that you want to ask. Um but we do need to leave the auditorium [1:27:17] now so that uh Ringcon High can close up for the evening. Thank you very much to [1:27:22] Ringcon High for hosting us and thank you all for being here.