1 00:54:50,810 --> 00:54:56,370 This file is a little bit large, so I'm hoping it's going to cooperate with us today. 2 00:54:57,310 --> 00:54:59,970 But so first we'll talk about the horizontal curves. 3 00:55:00,430 --> 00:55:29,930 So the first curve that was noted that does not meet 30 or a 35 mile an hour, design is just up here at the end. So this little curve here, you're coming into a stop condition. So that's generally not a significant, you know, if you, if the sightlines are clear and you're coming around a horizontal curve and you know there's a stop sign there, that's not of significant concern. 4 00:55:30,430 --> 00:55:38,730 Then the other area horizontally and everybody is quite familiar with this area is the curves 5 00:55:38,730 --> 00:55:45,230 in the area of the six-mile creek crossing. So those would mean a 40-mile-an-hour design, 6 00:55:47,110 --> 00:55:55,070 let's see if it loads. It meets 35 but not 40. And that's currently posted as a 35-mile-an-hour 7 00:55:55,070 --> 00:55:59,450 area through that section. So but it does meet 35 to 8 00:55:59,450 --> 00:56:03,850 not 40. Whole road is 35 isn't it? Currently the 9 00:56:03,850 --> 00:56:08,210 posted speed limit. So the city determined a rural 10 00:56:08,210 --> 00:56:12,210 residential district through the central portion of the 11 00:56:12,210 --> 00:56:15,250 roadway. So where there's homes, where there's driveways 12 00:56:15,250 --> 00:56:18,630 accessing. So that was in accordance with state statute at the 13 00:56:18,630 --> 00:56:23,850 time. And now we can change that. So under the new law, the city 14 00:56:23,850 --> 00:56:29,370 It has more control over setting the speed limit. 15 00:56:29,890 --> 00:56:35,910 It's a little unclear yet how one does that, because the language says we still have to have 16 00:56:35,910 --> 00:56:39,910 an engineering study and all sorts of reasons for why we need to do it. 17 00:56:40,530 --> 00:56:45,770 So cities are currently trying to figure out what the legislature meant by what they're 18 00:56:45,770 --> 00:56:47,190 looking for for a study. 19 00:56:48,490 --> 00:56:52,010 I thought they didn't have to, as long as it was a residential. 20 00:56:52,010 --> 00:56:58,210 Correct, but this wouldn't meet the definition of a residential street along its whole corridor. 21 00:56:59,730 --> 00:57:05,310 So within a neighborhood where you have house after house after house after house, 22 00:57:05,830 --> 00:57:08,930 that would meet the definition of a residential roadway. 23 00:57:09,210 --> 00:57:12,670 Where land use on either side of it is single family or multifamily homes. 24 00:57:13,390 --> 00:57:14,650 So go back to my question. 25 00:57:15,230 --> 00:57:19,710 Isn't the road in fact 35 from end to end or were you saying it changes? 26 00:57:21,010 --> 00:57:23,450 It's unposted on either end. 27 00:57:23,770 --> 00:57:26,110 There's a posted speed limit in the middle. 28 00:57:26,470 --> 00:57:26,930 Okay, got it. 29 00:57:27,230 --> 00:57:30,030 And that was in accordance with state statute at the time. 30 00:57:30,210 --> 00:57:32,670 The Council passed your resolution to designate 31 00:57:32,670 --> 00:57:36,810 that a rural residential district that allowed you to post it at 35. 32 00:57:37,190 --> 00:57:38,630 All right, and that's the only posting on the road. 33 00:57:38,770 --> 00:57:40,070 It's what a mile and a half. 34 00:57:40,650 --> 00:57:40,950 Okay. 35 00:57:42,450 --> 00:57:43,490 Thank you. 36 00:57:44,690 --> 00:57:49,150 Okay, so that otherwise horizontally, the roads fairly straight. 37 00:57:49,150 --> 00:57:55,310 If there weren't any other horizontal curves worth noting when we did our review. 38 00:57:56,290 --> 00:58:00,470 Now vertically, so the bottom half here is showing the road profile. 39 00:58:00,750 --> 00:58:08,370 So if you drive down the center of the road, each curve has information associated with it 40 00:58:08,370 --> 00:58:13,970 and there's design standards for what how steep those curves should be, what the length 41 00:58:13,970 --> 00:58:18,610 of the curve should be, and it takes into account things like stopping sight distance. 42 00:58:18,610 --> 00:58:25,750 So if you're, let's say you're, you know, coming up a hill and you're going, let's take 43 00:58:25,750 --> 00:58:29,310 ourselves somewhere other than here, you're going 65 miles an hour. 44 00:58:29,690 --> 00:58:35,710 You need to be able to see over that hill so that you don't suddenly, somebody stopped 45 00:58:35,710 --> 00:58:39,630 on the other side of the hill and you smash into them because there's a driveway that 46 00:58:39,630 --> 00:58:43,210 are turning into, you can't see them, you're speeding up over the hill. 47 00:58:43,210 --> 00:58:49,070 So, you know, design speed is intended to design a road that's safe so that you aren't 48 00:58:49,070 --> 00:58:51,650 seeing accidents and things of that nature. 49 00:58:52,790 --> 00:58:59,650 So working our way from one end of the road to the other, beginning by kind of road 43, 50 00:59:00,990 --> 00:59:11,190 this first little uphill climb does not meet 35 mile an hour design speed, but it does 51 00:59:11,190 --> 00:59:20,050 30 and again you're coming into a stopped condition. So it's pretty close to a 35 and we 52 00:59:20,050 --> 00:59:27,790 really in this graphics scanned for 35 mile an hour. So if I don't stop on it it means it's 53 00:59:27,790 --> 00:59:40,250 35 mile or better. So here is the big hill by Schmeeg's house and that one does not need a 35 mile 54 00:59:40,250 --> 00:59:43,390 design speed but it meets a 30. 55 00:59:46,540 --> 00:59:51,960 And then we have one more little guy at the end that does not 56 00:59:51,960 --> 00:59:58,040 meet 30 but it's a stop condition. You're coming up to the intersection of 11 so it's not from 57 00:59:58,040 --> 00:59:59,960 technical perspective, it's not... 58 01:00:00,000 --> 01:00:17,260 As great of a concern. The rest of the curves vary from 40 miles an hour to 60 to 35, 35, 35, 55, 65, 60, 40, 35. So, lots of 35s along the corridor. 59 01:00:18,480 --> 01:00:29,980 If you were to say that you wanted the design speed to be 40, then there would be more curves that would need to be vertically adjusted in order to meet that design speed. 60 01:00:29,980 --> 01:00:37,360 So to talk through what that means a little bit, so the length of this curve is 61 01:00:41,940 --> 01:00:45,360 250, I can't read this as well. 62 01:00:45,780 --> 01:00:54,760 But the curve as it exists today is 250 in order to be 35 miles an hour, it would need to be 275. 63 01:00:55,380 --> 01:01:00,340 So what that means is we would need to drop the road down a little bit and lengthen the curve. 64 01:01:00,340 --> 01:01:07,900 So you'd be lowering the center of the road in order to achieve that 35 mile an hour curve. 65 01:01:10,420 --> 01:01:17,620 So as it stands the way preliminary design was authorized, we were directed to match the existing conditions. 66 01:01:17,920 --> 01:01:27,300 If the council wanted us to start taking a look at shifts in alignment horizontally or vertically from a design speed perspective, 67 01:01:27,300 --> 01:01:33,020 that would be something you would want to do as we move into final design. So you wouldn't 68 01:01:33,020 --> 01:01:38,500 want us to go through all of final design and do a bunch of engineering work and then when we 69 01:01:38,500 --> 01:01:46,260 present final plans say oh hey we need to make that curve a 35 mile an hour curve that now 70 01:01:46,260 --> 01:01:52,540 would be the appropriate time to make that transition in the in the project if that was something 71 01:01:52,540 --> 01:01:58,080 that the council was interested in doing and we can come back to that. 72 01:01:58,900 --> 01:02:02,060 Okay, so the next thing we're going to talk about is the trail. 73 01:02:02,900 --> 01:02:09,120 So the council authorizes us to look at adding a trail on the north side of the road. 74 01:02:09,860 --> 01:02:13,480 And as you recall, when we talked about it, there was a lot of questions. 75 01:02:13,600 --> 01:02:17,100 Well, what does it mean? What's it going to cost? Are we going to need a bridge? 76 01:02:17,100 --> 01:02:21,180 how are we going to fit this along certain parts of the road? 77 01:02:21,760 --> 01:02:26,280 We need a wall, three impacts, things of that nature. 78 01:02:26,820 --> 01:02:29,160 So, the first thing we did was work with the consultant 79 01:02:29,160 --> 01:02:31,760 to come up with a couple of different alternatives 80 01:02:31,760 --> 01:02:33,960 for how that trail could be added. 81 01:02:35,260 --> 01:02:41,480 Given what the recommendation was relative to the road itself. 82 01:02:42,380 --> 01:02:44,940 So, leaving the road and it's existing horizontal location 83 01:02:44,940 --> 01:02:52,940 and then adding a trail on the north side with a little bitty ditch in between was one of the alternatives they looked at. 84 01:02:54,140 --> 01:03:03,120 They also looked at, so this is creating some red flags in terms of how things were tied into the existing neighborhoods, 85 01:03:03,340 --> 01:03:05,980 neighbors to the north and landed to the north. 86 01:03:06,600 --> 01:03:13,380 So the consultant ran an option where you put some curving gutter in and then really dropped the trail down below the road. 87 01:03:13,380 --> 01:03:23,500 When you drive that corridor along the north side there's a lot of areas where the slope slopes away from the road so they were trying to kind of capture what was happening out there. 88 01:03:24,460 --> 01:03:27,520 Then they also looked at. 89 01:03:29,040 --> 01:03:36,960 Because then it was starting when you look at battle alternative it was starting to push the trail in certain areas outside of the roadway easement. 90 01:03:36,960 --> 01:03:46,600 So, the existing gravel road isn't necessarily centered exactly in the existing roadways meant you can picture how that would happen over time when you're dealing with a gravel road. 91 01:03:47,760 --> 01:03:53,800 It isn't fixed the same way a road with curbing gutter might be. 92 01:03:54,260 --> 01:04:04,740 So, under that alternative too, we were starting to see that the trail was really starting to skirt onto private property in a couple of sections. 93 01:04:04,740 --> 01:04:10,620 So, they ran an option where they moved the curb, moved the trail right up next to the curb. 94 01:04:10,780 --> 01:04:15,900 So, like we have on Smith Town Road, it's actually a sidewalk, but it's the same concept where you have curb, 95 01:04:16,120 --> 01:04:17,860 but the trail right next to the road. 96 01:04:19,700 --> 01:04:25,620 This option minimizes the impacts to the adjacent property owners, but it has the highest cost, 97 01:04:25,700 --> 01:04:30,120 because you're running curving gutter along the whole length of the project, 98 01:04:30,580 --> 01:04:33,560 and then you would also need to introduce stormwater treatment. 99 01:04:33,560 --> 01:04:42,260 So, one of the important factors for us to look at with the trail is what permit requirements 100 01:04:42,260 --> 01:04:48,580 would be triggered by constructing the trail and under water-said district rules if the trail 101 01:04:48,580 --> 01:04:54,020 drains to a green area that's half the width of the trail. 102 01:04:54,160 --> 01:04:58,260 The trail is exempt from needing treatment. 103 01:04:58,260 --> 01:05:00,000 So, if the... 104 01:05:00,000 --> 01:05:05,440 This trail half the width of it is draining into this green area. We wouldn't suddenly be obligated 105 01:05:05,440 --> 01:05:11,360 to construct stormwater ponds and storm sewer and whatnot to treat the impervious surface from 106 01:05:11,360 --> 01:05:18,620 the trail. In the case of this alternative, we would have had to. So I disliked that alternative 107 01:05:18,620 --> 01:05:26,240 pretty quickly from the cost implication associated with it. I spent considerable time with 108 01:05:27,040 --> 01:05:32,620 pages and pages of cross-sections of design detail, looking at those three options. 109 01:05:33,860 --> 01:05:42,840 The impacts to the property owners between the three didn't vary too wildly, but the cost 110 01:05:42,840 --> 01:05:47,800 of this one being higher caused us to rule that out. 111 01:05:47,800 --> 01:06:12,900 So, where we landed with what we wanted the consultant to finally drop and cost estimate off of was really similar to that first alternative, the only differences is we ended up shifting the road a little bit to the south so that the footprint was centered in the right away. 112 01:06:12,900 --> 01:06:17,980 So, there's parts of that road that are not quite centered in the roadway easement. 113 01:06:18,380 --> 01:06:23,060 We shifted the whole thing back to center, essentially so that we were splitting the impacts 114 01:06:23,060 --> 01:06:27,300 of the trail between the south side property owners and the north side property owners. 115 01:06:27,520 --> 01:06:32,480 Because it really was just starting to shove a little bit to far north and outside of the 116 01:06:32,480 --> 01:06:33,220 roadway easement. 117 01:06:33,420 --> 01:06:37,400 So, we would have had to acquire easements from the property owners in order to fit that 118 01:06:37,400 --> 01:06:37,780 trail. 119 01:06:39,350 --> 01:06:43,870 So you're going south all the way down the road? 120 01:06:44,270 --> 01:06:45,250 Just to smidge. 121 01:06:45,670 --> 01:06:47,910 So it's a time mode of couple feet. 122 01:06:48,430 --> 01:06:49,010 That it's just shipped. 123 01:06:49,010 --> 01:06:50,270 As you know, we have south. 124 01:06:50,550 --> 01:06:52,630 One of the residents would like you to go north. 125 01:06:53,890 --> 01:06:56,230 But we're still operating within the existing. 126 01:06:57,630 --> 01:07:02,250 This puts a footprint within the city's current authority 127 01:07:02,250 --> 01:07:04,990 to construct the improvements without acquiring easements 128 01:07:04,990 --> 01:07:07,650 from any of the landowners if you wanted to build a trail. 129 01:07:08,610 --> 01:07:16,930 If you built a road, you would normally go down the center of the surveyed right away. 130 01:07:17,110 --> 01:07:21,010 So when we build a brand new road, we locate it in the center. 131 01:07:22,950 --> 01:07:30,690 When I reconstruct a road, I typically recommend reconstructing it along the same centerline of the existing 132 01:07:30,690 --> 01:07:34,670 traveled way to minimize the impacts to adjacent property owners. 133 01:07:34,890 --> 01:07:39,410 So things like trees, hedges, fences, things like that. 134 01:07:41,200 --> 01:07:43,120 Just a new road or a reconstructed road? 135 01:07:44,060 --> 01:07:45,420 It's a reconstructed road. 136 01:07:47,120 --> 01:07:50,360 But if the intent is to not acquire easements, 137 01:07:50,460 --> 01:07:52,740 this is the way we would have to shift it 138 01:07:52,740 --> 01:07:56,400 to fit the trail without having to acquire easements from the adjacent landowners. 139 01:07:56,840 --> 01:07:57,980 And when we walk through the layout, 140 01:07:58,100 --> 01:08:00,880 I can show you some of those areas where it was a little bit tight. 141 01:08:01,720 --> 01:08:06,520 And then the other alternative of course was the no trail alternative. 142 01:08:08,320 --> 01:08:15,180 So we will walk through the detailed layouts a little bit so you can see the difference between those. 143 01:08:15,900 --> 01:08:25,040 But I am just going to touch on a couple of things before we go into that detail so you kind of have some background in your head before we get there. 144 01:08:26,260 --> 01:08:34,000 So, in terms of where we landed on costs, so total costs, including construction, contingency, 145 01:08:34,200 --> 01:08:39,960 engineering and administrative costs, the roadway only with no trail, as depicted here, 146 01:08:40,100 --> 01:08:45,840 is about 2.1 million. The roadway plus trail kicked us up to 3.5 million. 147 01:08:47,480 --> 01:08:53,100 And what you really is driving that, and you can see that on the detailed cost estimate that's in your packet. 148 01:08:53,100 --> 01:09:00,340 you of course have the expense of the trail base and the pavement. That's obvious. But in order 149 01:09:00,340 --> 01:09:06,920 to fit that trail in and match it in with existing conditions and not start impacting outside 150 01:09:06,920 --> 01:09:13,240 of the city's roadway easement, you have to look at constructing some retaining walls in 151 01:09:13,240 --> 01:09:19,160 some areas and there's just additional grading because you're working outside of just the 152 01:09:19,160 --> 01:09:20,460 existing roadway footprint. 153 01:09:21,100 --> 01:09:24,500 So I'll highlight that as we walk through the details 154 01:09:24,500 --> 01:09:26,520 of the two layouts, where they're different. 155 01:09:27,560 --> 01:09:33,360 I'll note that the 2020 CIP included 2.482 million 156 01:09:33,360 --> 01:09:34,540 for this project, 157 01:09:36,660 --> 01:09:38,680 so you can see here the difference. 158 01:09:39,060 --> 01:09:40,920 These are the two detailed cost estimates. 159 01:09:42,020 --> 01:09:45,080 And we've got ditch grading for 95,000 160 01:09:45,080 --> 01:09:48,620 that we wouldn't have to do in that alternative for where 161 01:09:48,620 --> 01:09:51,000 we're just matching the road that's there. 162 01:09:51,660 --> 01:09:56,820 And then we have potentially $460,000 worth of retaining walls. 163 01:09:57,400 --> 01:09:59,960 That number might be able to be reduced if the land. 164 01:10:00,000 --> 01:10:09,220 Notice adjacent to some of these areas would be willing to grant temporary gate grading easements and let us grade beyond the right away line. 165 01:10:10,400 --> 01:10:18,260 So in the farm land or into their front yard, depending on where we're talking about along the corridor, there might be an opportunity to reduce that. 166 01:10:18,540 --> 01:10:21,960 This is the cost of the trail and itself. 167 01:10:21,960 --> 01:10:26,960 And then this is additional grading that would need to happen in order to, you know, the trail has to 168 01:10:27,900 --> 01:10:32,700 It can't just be floating in the air, so you would need to do some grading associated with it. 169 01:10:33,260 --> 01:10:43,360 I do want to note as the question seemed to be raised today from one of the property owners or it might have been from the hunt club. 170 01:10:44,060 --> 01:10:50,100 Under the city's assessment policy trails such as a trail along marsh lake road is not assessed. 171 01:10:50,100 --> 01:10:59,060 So, those under the city's assessment policy, the trail is not assessed, that would need to be funded by the city through the general tax level. 172 01:11:01,220 --> 01:11:11,320 Under the city's adopted assessment policy, a portion of the street and storm sewer costs would be assessed under the city's adopted policy. 173 01:11:11,320 --> 01:11:18,960 If we move forward to final designer when we move forward to final design, so we actually know the scope of what we're building, 174 01:11:19,480 --> 01:11:29,820 we'll end up running the project through the city's policy, and then we'll be coming back to the council for direction on what to do relative to the city's assessment policy. 175 01:11:30,020 --> 01:11:33,680 So you're not making any decisions about that yet. 176 01:11:33,680 --> 01:11:36,600 we wouldn't be prepared to present you information. 177 01:11:37,260 --> 01:11:41,000 What I would like to know is that we've been reconstructing 178 01:11:41,000 --> 01:11:46,000 a rehabilitating streets since 2003 and every single project 179 01:11:46,000 --> 01:11:50,520 has included some number of assessment to the adjacent property owners. 180 01:11:51,900 --> 01:11:55,320 I can tell you that every single project the neighbors had a reason 181 01:11:55,320 --> 01:11:58,560 why they shouldn't be assessed and why their project was different. 182 01:12:00,000 --> 01:12:02,800 But I can say with pretty good consistency 183 01:12:02,800 --> 01:12:10,800 and the advice that we have always given the council along the way is our advice is to try to treat everybody fair and equitably. 184 01:12:12,120 --> 01:12:19,020 And so that'll be the lens through which you'll be asked to take a look at whatever assessment calculations we might come back with. 185 01:12:19,260 --> 01:12:24,420 This quarter is unique from the other ones because we have these large tracks of undeveloped land. 186 01:12:24,800 --> 01:12:30,960 I had mentioned at a previous meeting that I would anticipate we would be going through the special benefit analysis process. 187 01:12:30,960 --> 01:12:36,740 process, like we did for stagger lake land, to help sort out what the assessments amount 188 01:12:36,740 --> 01:12:41,900 amount should be relative to state statute pertaining to special assessments. 189 01:12:42,320 --> 01:12:47,920 So if we move ahead, we'll have a whole meeting just on assessments alone. 190 01:12:48,200 --> 01:12:51,180 We'll have a whole meeting with the neighbors on assessments alone. 191 01:12:51,180 --> 01:12:55,400 That'll be a whole piece to come, but the council certainly it's the council's decision 192 01:12:55,860 --> 01:13:00,200 on how you would address or implement your policy on that. 193 01:13:00,200 --> 01:13:03,280 So, I did want to just note that there briefly. 194 01:13:04,420 --> 01:13:08,080 Okay, so we're going to look at the layout review with no trail. 195 01:13:08,220 --> 01:13:10,660 We're going to look at the layout review with a trail. 196 01:13:10,980 --> 01:13:15,000 And I just wanted to highlight some things for council discussion 197 01:13:15,000 --> 01:13:19,480 that will come after we take a look at those two different layouts. 198 01:13:20,040 --> 01:13:22,180 The big question is trail or no trail. 199 01:13:22,620 --> 01:13:29,640 So, again, you don't want to change your mind on whether you're building a trail or not. 200 01:13:29,640 --> 01:13:35,940 once you're in final design. Once you start spending the expensive engineering dollars to produce 201 01:13:35,940 --> 01:13:42,000 detailed plans and specifications for bidding purposes, you really want to know what you're building, 202 01:13:42,260 --> 01:13:47,580 otherwise you're going to end up doing a lot of re-engineering, which we've already spent plenty 203 01:13:47,580 --> 01:13:53,100 of money on engineering on this project. I'd like to see us try to minimize what we spend there 204 01:13:53,100 --> 01:14:00,400 going forward. But the trailer, neuro-trail decision also sort of spills into some of these 205 01:14:00,400 --> 01:14:06,040 other things. So the council's gotten some feedback from property owners. So I just wanted 206 01:14:06,040 --> 01:14:11,060 to highlight some of the things that have been raised to the council as possible scope 207 01:14:11,060 --> 01:14:17,900 modifications. So vertical and horizontal alignment, we do have a property owner who's requested 208 01:14:17,900 --> 01:14:22,980 that the horizontal alignment be shifted, which will highlight when we walk through the layouts. 209 01:14:24,460 --> 01:14:30,740 There also was a little bit concern expressed or at least questions asked relative to those 210 01:14:30,740 --> 01:14:37,580 vertical curves. So should any of those vertical curves be modified from a 30 mile in our 211 01:14:37,580 --> 01:14:44,300 design speed to a 35 mile in our design speed? I don't think anybody in the residence realm 212 01:14:44,300 --> 01:14:50,660 advocating for a higher design speed than that. A question was raised about whether 213 01:14:50,660 --> 01:14:56,440 berms could be constructed along the road. Council would need to, if that's something 214 01:14:56,440 --> 01:14:59,660 that Council's interested in, I would need some direction about. 215 01:15:00,000 --> 01:15:11,700 Who are we screening? How big of a berms? What sort of criteria am I evaluating the berms on? With those take the place of the retaining walls or in addition to the retirement. 216 01:15:11,960 --> 01:15:25,260 You know, berms are tough because it really depends on the existing conditions adjacent to the property. So if you've got a roll that's going this way in a big giant retaining wall down to somebody's farmland. 217 01:15:25,260 --> 01:15:32,800 In order to build a berm, you'd have to go way up and then have an even bigger retaining wall on the back side of the berm. 218 01:15:34,280 --> 01:15:44,150 But in other areas where the road might be draining yards might be draining down to the road, then you could potentially fit a berm in there. 219 01:15:45,290 --> 01:15:49,850 But if that's, I wouldn't expect you to say tonight, yes, build berms. 220 01:15:49,910 --> 01:15:55,650 But if that's something you want me to investigate further, I would need that direction because that isn't currently in the scope. 221 01:15:55,650 --> 01:16:03,890 Why? What do we want berms for? I would imagine that, and the city, you know, certainly 222 01:16:03,890 --> 01:16:08,070 when development comes in, we'd be looking at Birmingham requirements for the development 223 01:16:08,070 --> 01:16:13,790 adjacent to a road such as this. It provides screening, essentially, from the roadway. 224 01:16:15,630 --> 01:16:22,330 Okay. So like the berms along Connie wrote 11, you know, those big, I know, yeah. 225 01:16:22,330 --> 01:16:30,330 Yeah, but that's for those, it's to hide the developments and protect the noise crack. 226 01:16:30,330 --> 01:16:31,730 That what it is for the noise. 227 01:16:31,850 --> 01:16:34,710 Yep, and visual separation between the two. 228 01:16:34,970 --> 01:16:36,770 And the developers pay for it. 229 01:16:36,850 --> 01:16:37,090 Correct. 230 01:16:38,610 --> 01:16:40,170 So is this just for the new development? 231 01:16:40,830 --> 01:16:46,270 It was a question raised in an email to the council, is whether firms were included in the 232 01:16:46,270 --> 01:16:50,510 project or not, and they aren't currently, but could be should the council want to explore 233 01:16:50,510 --> 01:16:51,070 that further. 234 01:16:51,390 --> 01:16:51,570 Okay. 235 01:16:51,570 --> 01:17:01,330 The next one was street lights, so this is a noteworthy topic, we've added trails in a couple 236 01:17:01,330 --> 01:17:10,350 of different locations. The most recent was a long 78th in Cochia. We did end up adding 237 01:17:10,350 --> 01:17:18,110 some street lights along that trail in order to light the trail. That was occurring in conjunction 238 01:17:18,110 --> 01:17:23,010 with the whispering hills development so there wasn't anybody living there yet so you know you're 239 01:17:23,010 --> 01:17:28,290 putting lights in so that when people move in they're used to the lights. Adding street lights 240 01:17:28,290 --> 01:17:36,190 after the fact can be challenging when you know you have existing homes in an area that are used to 241 01:17:36,190 --> 01:17:40,710 having it be dark and then you come in and start putting street lights. Street lights are not currently 242 01:17:40,710 --> 01:17:45,890 in the scope that is that is something that the city council could direct us to take a look at 243 01:17:45,890 --> 01:17:52,530 me the first question is trail or no trail. My kind of quick answer is that I've the only place 244 01:17:52,530 --> 01:17:57,630 and I need to talk with the park and director about it, but the place for street lights that 245 01:17:57,630 --> 01:18:04,330 comes to my mind would be at locations where future roads tie in. So if a new residential street 246 01:18:04,330 --> 01:18:10,770 connects, you know, typically you'll see a street light at an intersection. So when you're driving up 247 01:18:10,770 --> 01:18:16,770 you can, you know, find the intersection you're supposed to turn into. Okay. But those could be added. 248 01:18:16,930 --> 01:18:23,170 Correct. Afterwards. Those street lights could be added after the fact, because it's those are 249 01:18:23,170 --> 01:18:28,670 Minnesota Valley would be the provider there. It isn't like downtown here where we're paying for. 250 01:18:29,190 --> 01:18:35,550 And I mean, we'd have to pay for this street lights either way, but we run the electrical system for all of these lights. 251 01:18:36,690 --> 01:18:41,890 Overhead utility lines, there are some overhead lines along that road. 252 01:18:43,530 --> 01:18:50,630 In the option where we have no trail, we wouldn't need to relocate or bury those overhead 253 01:18:50,630 --> 01:18:55,530 power lines. The city certainly could choose to pursue that. 254 01:18:55,570 --> 01:19:00,050 The city would pay 100% of the cost associated with burying those lines. 255 01:19:01,770 --> 01:19:12,290 If we're putting the trail in and the utility lines are in the way of the trail, then under a right away ordinance we can require the utility company to relocate. 256 01:19:13,470 --> 01:19:17,330 And they likely would have to relocate to the non trail side of the road. 257 01:19:18,190 --> 01:19:24,870 Then we would only pay the incremental costs to bury the lines, the costs to relocate. 258 01:19:24,870 --> 01:19:29,370 They have to pay, so we would just be paying the incremental cost to bury. 259 01:19:30,950 --> 01:19:37,230 I think it would be important to understand trail or no trail before you really start looking at the overhead utility lines. 260 01:19:37,370 --> 01:19:47,730 Typically that's an in-final design, we'll be looking at any impacts to gas lines, power lines, any existing cable lines that might be an area. 261 01:19:47,830 --> 01:19:52,490 That would be part of the final design scope, so that's one that you could still. 262 01:19:52,910 --> 01:19:57,710 Do we have room in the existing right away to bury those or would we have to acquire right away to do so? 263 01:19:58,130 --> 01:19:59,990 We could put them under the trail if we wanted. 264 01:20:00,000 --> 01:20:10,040 Since it's our right away, we have some flexibility over what our comfort level would be and I think we'd pursue keeping it within the existing roadways, meant versus purchasing additional right away. 265 01:20:10,580 --> 01:20:23,300 Our goal tends to be first looking at it from the perspective of what's the lowest cost and the least amount of impact is typically how we'll first approach a project on a city project. 266 01:20:24,060 --> 01:20:30,000 The other question we were asked was whether the project included extension of sanitary sewer 267 01:20:30,000 --> 01:20:32,900 and water to the residential homes in the area. 268 01:20:33,580 --> 01:20:35,760 The project does not currently include that. 269 01:20:36,020 --> 01:20:45,400 Under the city's assessment policies, 35% of the people who would be in the area for connection 270 01:20:45,400 --> 01:20:51,520 to sewer and water would need to petition the city to have a study extending sewer and water 271 01:20:51,520 --> 01:20:52,360 to them. 272 01:20:53,160 --> 01:20:58,480 under the assessment policy, the property owner pays a 100% of the cost of that extension. 273 01:20:59,540 --> 01:21:04,740 So, you know, this isn't a trunk line extension, this would just be a lateral water line extension to the homes. 274 01:21:05,300 --> 01:21:13,360 I think realistically, just given what I know about how far away sewer and water is currently from the existing homes, 275 01:21:13,440 --> 01:21:16,160 it's probably premature to pursue that. 276 01:21:17,880 --> 01:21:22,960 If I'm them, I would want to maybe look at it once the pipes are a little closer. 277 01:21:24,040 --> 01:21:27,460 But that's if that's something that the property owners are interested in, that's certainly 278 01:21:27,460 --> 01:21:30,000 something we can talk through with them. 279 01:21:30,540 --> 01:21:36,580 And they have the right to petition at any time, the form is on the city's website that can 280 01:21:36,580 --> 01:21:37,060 happen. 281 01:21:37,640 --> 01:21:42,620 We were also asked about high speed internet and I would just note that the city does not provide 282 01:21:42,620 --> 01:21:51,500 internet services so that's all privately operated and extended so the 283 01:21:51,500 --> 01:21:55,560 property owners would want to reach out to the internet providers and I did 284 01:21:55,560 --> 01:21:59,380 share information with the residents that asked me about it about who those 285 01:21:59,380 --> 01:22:05,380 providers are. So those are the things to kind of have in your background as we 286 01:22:05,380 --> 01:22:14,840 walk through the different layouts, and I will start with the trail layout first, I think. 287 01:22:19,460 --> 01:22:26,040 So, a giant file that hopefully will load. So, first of all, just to orient yourself what you're 288 01:22:26,040 --> 01:22:32,840 seeing, this yellow is the road with the shoulder on either side of the road. The pink is the trail and 289 01:22:32,840 --> 01:22:39,120 These dashed blue lines are what I would refer to as preliminary grading limit lines. 290 01:22:39,800 --> 01:22:46,000 Now this is just generated off of a standard typical section and match point thrown into 291 01:22:46,000 --> 01:22:47,260 a software program. 292 01:22:47,760 --> 01:22:53,840 When we get into final design, we'll start tweaking what those match points are to minimize 293 01:22:53,840 --> 01:22:56,140 the impact on adjacent property owners. 294 01:22:56,840 --> 01:23:02,280 So you shouldn't perceive that as being for sure how far we're going to have to grade 295 01:23:02,280 --> 01:23:05,760 outside of the roadway easement in order to do the work. 296 01:23:07,000 --> 01:23:12,340 These little yellow lines are the 66 foot wide roadways easement. 297 01:23:12,360 --> 01:23:14,660 Is that creating with the trail or without the trail? 298 01:23:14,740 --> 01:23:17,360 So this option you're looking at right now is with the trail. 299 01:23:18,740 --> 01:23:21,900 So this is not going to come as any surprise to anyone, 300 01:23:22,880 --> 01:23:24,360 but here's the pool. 301 01:23:24,740 --> 01:23:27,340 The trail does not fit adjacent to the pool. 302 01:23:28,200 --> 01:23:31,420 So we'll come back to this area once we jump over to the other line. 303 01:23:31,420 --> 01:23:39,560 But if we're going to look at putting a trail, pass the lakeside drive entrance all the way up to 43, we for sure can't fit it. 304 01:23:39,640 --> 01:23:43,420 We would have to move the road over in order to fit the trail. 305 01:23:45,200 --> 01:23:46,000 Oh, far. 306 01:23:47,740 --> 01:23:50,540 We'd have to decide how far we'd want to be. 307 01:23:50,720 --> 01:23:55,180 I mean, that's a design decision. So we'd take a look at what the design speed is coming around the corner. 308 01:23:55,680 --> 01:23:58,660 And then what we think is an appropriate setback from the pool. 309 01:23:58,660 --> 01:24:00,900 So that we'd be working with the planning department 310 01:24:00,900 --> 01:24:02,380 to see what they might recommend 311 01:24:02,380 --> 01:24:04,140 for how we should shift that over. 312 01:24:06,860 --> 01:24:09,320 So then we get into this section. 313 01:24:09,360 --> 01:24:11,280 So this is the Lakeside Estates neighborhood. 314 01:24:11,660 --> 01:24:14,440 There's two cul-de-sax that don't come through. 315 01:24:15,520 --> 01:24:17,480 There's landscaping already planted 316 01:24:17,480 --> 01:24:21,280 along the road right away and a wetland down here. 317 01:24:23,000 --> 01:24:24,880 We, if we're putting in a trail in, 318 01:24:25,000 --> 01:24:27,900 we're for sure gonna need to construct a retaining wall 319 01:24:27,900 --> 01:24:32,380 through this section because we don't want to rip out trees that were just planted and we don't 320 01:24:32,380 --> 01:24:37,880 want to impact a wetland in order to fit a trail in. So this this wall is included in the 321 01:24:37,880 --> 01:24:45,020 cost calculation and is something that that I would see not needing not being able to be eliminated. 322 01:24:49,320 --> 01:24:55,520 And then again we're just still following the existing footprint. So just to orient everybody. 323 01:24:55,520 --> 01:24:59,360 This is the lightener property and this is Jeremy Rock's house. 324 01:25:00,000 --> 01:25:08,240 This is Jeremy Rocks. On developed land, I guess I'm going to refer to it that he purchased, but they live in this house. 325 01:25:09,940 --> 01:25:18,420 And again, you're seeing some some gradient limits extending out here past some trees that are located within the roadway easement. 326 01:25:18,420 --> 01:25:22,100 And it's with this trail option. 327 01:25:22,560 --> 01:25:27,600 It looks to me based on my detailed review that we probably would be looking at potentially 328 01:25:27,600 --> 01:25:35,880 having to move some trees within the road right of way, the roadway easement in this area 329 01:25:35,880 --> 01:25:38,820 in order to protect those trees. 330 01:25:39,320 --> 01:25:44,140 But again, when we got into final design, there's different things we can take a look 331 01:25:44,140 --> 01:25:45,800 at to see if we can save them. 332 01:25:45,800 --> 01:25:51,460 first goal is always preservation of trees regardless of where they are. We try to look through 333 01:25:51,460 --> 01:25:59,540 that lens. Coming around this curve, so we are recommending that in any scenario we would have 334 01:25:59,540 --> 01:26:04,460 curb and gutter on both sides of the road through this section in order to minimize impacts. 335 01:26:04,680 --> 01:26:11,340 We have a wetland and a creek crossing and some pretty steep slopes off either side, but even with 336 01:26:11,340 --> 01:26:15,540 We potentially still need a retaining wall through this section. 337 01:26:18,040 --> 01:26:18,840 This area. 338 01:26:19,040 --> 01:26:21,440 The curb and gutters to avoid erosion problems. 339 01:26:21,800 --> 01:26:22,840 Correct. Yep. 340 01:26:22,840 --> 01:26:23,980 So what does water go? 341 01:26:24,480 --> 01:26:28,560 We would just then outlet at the end of the curb into the ditches. 342 01:26:29,320 --> 01:26:35,760 In this area, this is an example where the layout is showing pretty significant grading into this lot. 343 01:26:36,180 --> 01:26:38,560 But when I take a look at the grades in final design, 344 01:26:38,560 --> 01:26:41,600 we can pull that back. It isn't going to be that significant. 345 01:26:43,420 --> 01:26:45,740 A lot of those we can start to match in. 346 01:26:46,620 --> 01:26:50,300 So now here's an example where we would need a retaining wall. 347 01:26:50,940 --> 01:26:56,180 Here and all the way along the schmigs property. 348 01:26:56,820 --> 01:27:02,900 If we were trying to minimize the need for grading easements onto their property. 349 01:27:03,700 --> 01:27:08,460 Now because this is farmland, it's quite possible that the property owner would say 350 01:27:08,460 --> 01:27:13,400 sure we'll work with you and let you do some grading as long as, you know, you do it at a time 351 01:27:13,400 --> 01:27:18,300 that doesn't impact our farming operation. So, because I imagine they don't want to 352 01:27:18,300 --> 01:27:23,480 wall along their property either. So, you know, there might be some opportunities to minimize that 353 01:27:23,480 --> 01:27:30,420 sort of thing in working with the landowner. But the direction that, you know, we first gave the consultant 354 01:27:30,420 --> 01:27:36,480 was stay within our property. Let's not, let's try to avoid that and what does that look like. 355 01:27:38,840 --> 01:27:47,530 So aside from that, you do, you are going to just have some additional like kind of wider 356 01:27:47,530 --> 01:27:53,170 grading limits in order to make the slopes match in because we are adjusting the roads 357 01:27:53,170 --> 01:27:53,750 slightly. 358 01:27:54,310 --> 01:28:00,050 When I didn't move the center line, this trail was starting to kick out on to private property, 359 01:28:00,570 --> 01:28:05,550 which then we'd be into land acquisition and everything in order to fit the trail in. 360 01:28:05,550 --> 01:28:12,170 Not in this particular area. I'd have to go back and look at where it was in my notes here, but 361 01:28:12,170 --> 01:28:15,950 So alternatively if we take a look at the option 362 01:28:15,950 --> 01:28:19,990 Whoops, I have it open here with no trail 363 01:28:23,730 --> 01:28:26,970 So starting back over here on the 364 01:28:27,630 --> 01:28:28,910 West End 365 01:28:31,920 --> 01:28:35,680 one thing that the city council could consider doing I 366 01:28:35,680 --> 01:28:42,640 I don't know that I would invest in reconstructing this existing paved section. 367 01:28:43,020 --> 01:28:44,560 Let's say you aren't doing a trail. 368 01:28:45,260 --> 01:28:49,740 I wouldn't recommend that you invest reconstructing the part 369 01:28:49,740 --> 01:28:53,840 from Lakeside Drive back to County Road 43 in its current location 370 01:28:54,220 --> 01:28:57,900 because of its proximity to the pool even as it exists today. 371 01:28:58,560 --> 01:29:01,680 We do know that this property is for sale for development. 372 01:29:01,680 --> 01:29:08,780 So, you know, realistically, if a development comes forward and they do seem to be motivated 373 01:29:08,780 --> 01:29:13,660 sellers, we've had a number of different developers look at the property, part of what 374 01:29:13,660 --> 01:29:17,600 their questions were was what's happening with marsh lake road and as we're developing 375 01:29:17,600 --> 01:29:22,920 and increasing certainty from council direction to the state, it'll be easier for them to 376 01:29:22,920 --> 01:29:29,540 understand what that looks like, but we could at the time that this parcel develops then 377 01:29:29,540 --> 01:29:36,420 realistically shift this road over some amount of feet and work to purchase or acquire the 378 01:29:36,420 --> 01:29:42,080 property through the development process and then program the reconstruction of that section 379 01:29:42,080 --> 01:29:49,120 of road. This existing road is paved. It's in not great condition, so as part of a project, 380 01:29:49,280 --> 01:29:55,280 I would probably recommend we invest some maintenance to this road, so we do some additional patching. 381 01:29:55,280 --> 01:29:59,280 You know, we take a look at that a little bit more closely if that, if that was the direction 382 01:29:59,280 --> 01:29:59,960 the council was. 383 01:30:00,000 --> 01:30:06,980 But I, to me, you know, if this was never going to develop, then I think you maybe would want to look at it a little bit differently. 384 01:30:07,220 --> 01:30:24,340 But because it's for sale and people have come a calling about it, you maybe would want to limit the project's end point to be that time into that existing pavement, and then we figure out how to get it shifted over with or without a trail at some greater point in time. 385 01:30:24,340 --> 01:30:32,080 So, as you run along the rest of this corridor, and if you put them side by side or had the 386 01:30:32,080 --> 01:30:37,140 pleasure, so what I get to look at is cross sections every 50 and 100 feet of what those 387 01:30:37,140 --> 01:30:45,060 tie-in points look like, we can really match the existing slopes that are out there and pull 388 01:30:45,060 --> 01:30:51,720 these blue grading lines really up close to the road by just tying into the slopes that are there 389 01:30:51,720 --> 01:30:55,440 to really make sure that we aren't impacting any trees 390 01:30:55,440 --> 01:30:58,760 or impacting any private property improvements 391 01:30:58,760 --> 01:31:00,560 that might exist in that area. 392 01:31:01,300 --> 01:31:03,660 So even in this area where we had a pretty significant 393 01:31:03,660 --> 01:31:08,260 retaining wall, we can just tie into the slope that's there. 394 01:31:08,520 --> 01:31:10,980 So the slope that's there is steep today, 395 01:31:11,060 --> 01:31:15,960 it'll remain steep, but certainly we could minimize cost 396 01:31:15,960 --> 01:31:17,440 by doing that. 397 01:31:18,240 --> 01:31:26,280 As we get over by Jeremy's property again, this blue line starts to kick out past these trees, 398 01:31:26,360 --> 01:31:32,060 but when I looked at it in detail, it looks to me like we can pull the gradient and not impact 399 01:31:32,060 --> 01:31:37,700 any of those trees that are in the roadway easement. We won't know for certain until we get to 400 01:31:37,700 --> 01:31:42,680 detailed final design, but whether we have to extend the curve out a little bit further, 401 01:31:42,680 --> 01:31:48,500 would be something we could consider. So all of these really blue lines, like here, you're 402 01:31:48,500 --> 01:31:56,660 seen blue kick out of the roadway easement and I do think that we can match at the easement line 403 01:31:56,660 --> 01:32:05,600 and not impact what would be private landscaping and whatnot outside of the road edge. Driveways would 404 01:32:05,600 --> 01:32:13,320 end up tying in pretty consistently with how they are today. This driveway actually is a little 405 01:32:13,320 --> 01:32:16,800 of a challenge with the trail, I haven't quite figured out how we do that because you've 406 01:32:16,800 --> 01:32:21,980 got the trail there and their driveway is kind of coming uphill, but that would be a 407 01:32:21,980 --> 01:32:27,580 design detail that we'd work through. Same thing with this here, we would just, the slopes 408 01:32:27,580 --> 01:32:32,520 are steep off the sides of this road, so we'd be just looking to tie them in as close as possible 409 01:32:32,520 --> 01:32:41,500 to the existing edge. So then we're really, you know, minimizing the impacts along there. And 410 01:32:41,500 --> 01:32:45,160 And so when you do that, you end up reducing the cost. 411 01:32:45,560 --> 01:32:52,380 So if you go back to what the costs are between the options, that's why you're seeing 412 01:32:52,380 --> 01:32:57,260 such a significant difference in cost between the two because you're really just matching 413 01:32:57,820 --> 01:32:58,780 what's there. 414 01:32:59,240 --> 01:33:04,580 To be clear that 3.5 doesn't include acquisition of the right away, though, either doesn't 415 01:33:04,580 --> 01:33:05,640 attempt grading. 416 01:33:06,060 --> 01:33:06,280 Correct. 417 01:33:06,480 --> 01:33:07,840 So we can correct. 418 01:33:08,160 --> 01:33:10,920 So it doesn't deal with the West End realignment. 419 01:33:10,920 --> 01:33:15,960 Right. I mean, do you have a ballpark? Is it a half a million dollars for right away acquisition? 420 01:33:16,680 --> 01:33:17,680 I mean, it's 200,000. 421 01:33:17,860 --> 01:33:22,900 I mean, from the meat cutters property, that would be the only place we would need it. 422 01:33:22,920 --> 01:33:24,160 That's the only place we'd need it. 423 01:33:24,160 --> 01:33:30,800 If we, if the council authorized shifting the alignment, the rest we figured out we can fit within the current 424 01:33:30,800 --> 01:33:37,720 Worldweight easement, we just would need to possibly pursue some temporary grading easements from property owners. 425 01:33:37,720 --> 01:33:41,060 historically we haven't paid for temporary graining easements. 426 01:33:41,140 --> 01:33:43,400 Got it. So it's 3.5 million plus. 427 01:33:45,300 --> 01:33:46,240 I am. 428 01:33:46,240 --> 01:33:50,660 I was in for the re-cutters, the shifting road. 429 01:33:53,200 --> 01:34:01,640 We somehow tried to work that into, you know, passing it on to the property. 430 01:34:02,680 --> 01:34:09,740 I mean, with the city of any recourse on recovering the cost of that shift. 431 01:34:13,420 --> 01:34:16,140 You're saying don't shift it until it develops, though. 432 01:34:16,220 --> 01:34:19,700 Yeah, but I think you'd have to fund the road improvement. 433 01:34:20,040 --> 01:34:25,420 I think you'd have a pretty tough case to say that they have to not only accommodate your additional right away, 434 01:34:25,500 --> 01:34:30,500 but they also have to build the new road when they have a perfectly good road. 435 01:34:30,920 --> 01:34:30,960 Yeah. 436 01:34:31,600 --> 01:34:35,680 I want to be clear, I threw out 500,000. 437 01:34:35,760 --> 01:34:37,920 I have no idea if that's anywhere near. 438 01:34:38,740 --> 01:34:48,200 So is the 2.1 reconstructing the road just to the existing surface? 439 01:34:48,560 --> 01:34:54,420 No, we included since the council had authorized the entire corridor, the cost estimates 440 01:34:54,420 --> 01:35:00,000 assume so rebuilding the entire road cracked, but if we, I mean, you know, you'd... 441 01:35:00,000 --> 01:35:07,000 I'll have the expense. It's just you'd defer the exilator to some later point in time. Okay. And then did we? 442 01:35:09,120 --> 01:35:12,260 Okay. Let me. Okay. Were you done? 443 01:35:12,700 --> 01:35:28,680 I think the only other thing that I wanted to say was that really what we're asking for tonight, if the council is ready, would be to move for final design for marsh lake road with or without a trail and maybe provide some direction if you want. 444 01:35:29,280 --> 01:35:34,460 us to look at vertical and horizontal alignment revisions or any of these other elements. 445 01:35:35,200 --> 01:35:40,100 If you're not comfortable making a decision tonight, we certainly could revisit this. 446 01:35:40,240 --> 01:35:42,980 My recommendation would be at the first meeting in January. 447 01:35:43,980 --> 01:35:47,040 So we don't impact the project schedule. 448 01:35:48,600 --> 01:35:53,420 If there's additional things you'd like me to look at between now and then, it would be helpful 449 01:35:53,420 --> 01:35:55,020 for you to provide that direction. 450 01:35:55,640 --> 01:35:56,800 But with that, then I'm finished. 451 01:35:56,800 --> 01:36:03,480 Okay. Thank you, Judy. Go ahead. Well, I just wanted to check with you because of the 452 01:36:03,480 --> 01:36:09,220 rack residents wanting to move the road north. 453 01:36:11,650 --> 01:36:13,450 Would this increase the cost? 454 01:36:14,890 --> 01:36:22,870 Yeah, going back to my, how much it would, so Mr. Rock is requesting that the road be shifted to 455 01:36:22,870 --> 01:36:29,650 north adjacent to the house that he owns here and the land he owns here. What he's 456 01:36:29,650 --> 01:36:33,590 indicated is that we wouldn't have to purchase the right away in order to accommodate 457 01:36:33,590 --> 01:36:39,690 that shift. I would anticipate he would provide the right away in exchange for vacating 458 01:36:39,690 --> 01:36:45,810 the existing roadway easement adjacent to his house. You know the front set back from his 459 01:36:45,810 --> 01:36:50,750 house and Vicki's house is pretty close to the existing road. So I think his intent is 460 01:36:50,750 --> 01:36:59,450 move the traffic a little further away from is property. As a rule of thumb, as I indicated earlier, 461 01:36:59,710 --> 01:37:04,950 the second news shift the road off the existing alignment by some number of feet, 10, 20, 462 01:37:04,950 --> 01:37:10,570 30, 40 feet, whatever the number is, you are going to add cost. Are those cost significant to 463 01:37:10,570 --> 01:37:19,030 not as subjective? We would have to do a comparative analysis to see what sort of additional 464 01:37:19,030 --> 01:37:23,250 grading we'd have to do, so that, you know, if that's something that council is interested in, 465 01:37:23,330 --> 01:37:28,530 that's direction you could give us to try to quantify how much are we shifting it and what 466 01:37:28,530 --> 01:37:35,880 would that cost be? You do need to remember in the context though of we're also tying into these 467 01:37:36,690 --> 01:37:42,570 curves on either end, so we still have to, you know, you got to tie the road together. You can't just 468 01:37:42,570 --> 01:37:47,730 pick up a section and move, so we'd have to do a little bit of design work to see where you'd 469 01:37:47,730 --> 01:37:49,790 that in. 470 01:37:50,070 --> 01:37:52,170 How many feet does he want to move the road? 471 01:37:54,030 --> 01:37:55,210 He's like 50. 472 01:37:55,730 --> 01:37:56,110 50. 473 01:37:58,870 --> 01:38:00,070 And move it north. 474 01:38:02,490 --> 01:38:03,850 And over here is city park. 475 01:38:04,030 --> 01:38:06,270 So we already have land available here. 476 01:38:07,570 --> 01:38:09,090 Two shift it. 477 01:38:10,290 --> 01:38:10,830 Thank you. 478 01:38:11,110 --> 01:38:12,650 If we needed to. 479 01:38:15,780 --> 01:38:22,840 He's asking, at the moment, how much we cost to check that out and come up with a dip? 480 01:38:23,680 --> 01:38:27,220 My understanding, he's asking for the Council of the Authorized Shifting the Alignment, 481 01:38:31,410 --> 01:38:35,950 but there's, we would be doing it as a favor to him because he wants more space. 482 01:38:37,330 --> 01:38:39,350 And that's what he's asking. 483 01:38:40,990 --> 01:38:45,550 I didn't mention that to him and he seems to think that it's a safety issue as well. 484 01:38:45,550 --> 01:38:50,030 So I don't know, he, you know, he had Cubskout meeting tonight. 485 01:38:50,070 --> 01:38:53,850 So he couldn't, couldn't be at two places at once. 486 01:38:55,330 --> 01:39:01,070 If, and I did, I did ask him, I said, if this, if you wanted to do this, 487 01:39:01,070 --> 01:39:04,930 and it did cost extra, would you be willing to cover that? 488 01:39:04,950 --> 01:39:09,970 Because the residents on the rest of the road aren't going to want to pay for that. 489 01:39:10,610 --> 01:39:11,430 I don't think. 490 01:39:12,510 --> 01:39:13,930 They're all shaking their heads now. 491 01:39:15,170 --> 01:39:18,030 I asked him if, 492 01:39:22,020 --> 01:39:28,160 basically, I said that, from what I understood, there were additional 493 01:39:28,160 --> 01:39:33,720 costs to gain geotechnical data, et cetera, besides just moving dirt. 494 01:39:34,280 --> 01:39:40,060 Each city area has different soil conditions that would affect the outcome of the construction. 495 01:39:41,060 --> 01:39:42,520 So that's affecting the cost. 496 01:39:42,520 --> 01:39:52,640 And I said, I will see if Carrick can give us a ball part number if there would be additional costs to move the road and how much she would anticipate them to be. 497 01:39:53,160 --> 01:39:59,000 And then he had said he had talked to some road builders and I asked if he had numbers from the road builders. 498 01:39:59,720 --> 01:39:59,960 And 499 01:40:00,000 --> 01:40:05,880 Are you willing to be assessed for the additional costs to move the road for you if there 500 01:40:05,880 --> 01:40:11,180 are any. The road design and its current alignment is within the 30-get 35-mile design 501 01:40:11,180 --> 01:40:16,100 standards. So it looks like at this point moving the alignment would only be a benefit 502 01:40:16,100 --> 01:40:21,700 to you. And I said, that's a hard sell. The city and the other residents have marshley 503 01:40:21,700 --> 01:40:27,100 growth. So any additional info on your part would be helpful. And then he did write that 504 01:40:27,100 --> 01:40:34,340 quickly that the geotechnical data, they took was already in this location. 505 01:40:35,300 --> 01:40:41,000 So I don't know if we have that or not. 506 01:40:41,600 --> 01:40:49,420 And the roadway is 66 feet wide now, the area to the side by 50 feet is effectively 507 01:40:49,420 --> 01:40:52,740 in the same location as the current geotechnical data. 508 01:40:53,300 --> 01:40:54,620 They took, there's no difference. 509 01:40:54,620 --> 01:40:57,980 But the difference is you'd have to build a new road bed. 510 01:40:59,840 --> 01:41:05,060 Now we would be rebuilding the road bed and it's current configuration, but it's really, 511 01:41:05,300 --> 01:41:09,280 you know, picture if you pick it up and you move it 50 feet. Well, you got a, 512 01:41:09,380 --> 01:41:15,820 the area that you've now vacated a road needs to be graded to tie into the new road. 513 01:41:15,980 --> 01:41:18,700 And it needs to be restored with some sort of surface. 514 01:41:19,260 --> 01:41:21,520 So do those costs end up being significant. 515 01:41:21,520 --> 01:41:25,200 I wouldn't be comfortable throwing out a number without doing some estimate. 516 01:41:25,420 --> 01:41:28,560 The only thing I can tell you is that it would be at it. 517 01:41:28,560 --> 01:41:30,640 How much of a question would it be? 518 01:41:31,120 --> 01:41:33,100 Do you need a lot of time and effort to come up with that? 519 01:41:33,100 --> 01:41:33,960 I don't think so. 520 01:41:34,060 --> 01:41:36,940 I think our consultant would be able to look at that. 521 01:41:37,240 --> 01:41:39,580 Because of the, they have the county alignment, 522 01:41:39,800 --> 01:41:43,280 which is really the alignment that he was more interested in. 523 01:41:44,360 --> 01:41:47,180 And so, I think they did that through that. 524 01:41:47,180 --> 01:41:51,480 question, is give them some idea of how expensive this is? 525 01:41:51,940 --> 01:41:59,400 If it's too expensive to do, then we didn't know to stay right in the current alignment 526 01:41:59,400 --> 01:42:00,680 and not move anything. 527 01:42:02,720 --> 01:42:10,420 If it's not going to be that big of a deal to slide that road up right along through there, 528 01:42:12,460 --> 01:42:17,360 I don't think he's not going to, he's going to donate that property and then when he has 529 01:42:17,360 --> 01:42:23,120 on the side. I guess the grading would be okay, but he would be his yard. 530 01:42:23,780 --> 01:42:29,180 Yeah, I don't think that doing that analysis. I think we could do that analysis by the 13th. 531 01:42:29,180 --> 01:42:31,400 I think that'd be a reasonable thing to do. 532 01:42:31,760 --> 01:42:34,720 Without it being a big endeavor. 533 01:42:36,120 --> 01:42:42,180 At least to give you some, I mean, if I knew, I want some sort of idea of what added cost means. 534 01:42:43,180 --> 01:42:50,080 It would be a favor of looking at doing the analysis also a little bit of consideration 535 01:42:51,160 --> 01:42:58,100 if we were to start to shift it, we would soften that one curve, which is rated at a 35 536 01:42:58,100 --> 01:43:00,560 mile an hour curve, is that correct? 537 01:43:01,160 --> 01:43:04,520 Yeah, we could soften that one a little bit, is that make sense? 538 01:43:04,980 --> 01:43:11,480 And when you're reconstructing these roads to a nine-ton road, weren't we bringing in two feet 539 01:43:13,420 --> 01:43:19,300 Because we're not putting new sewer and water lines down the entire length of the road, we think we could 540 01:43:19,300 --> 01:43:27,580 That one foot of sand would be sufficient in this area and still to meet the nine tons standard. We wouldn't necessarily need the second foot self 541 01:43:27,580 --> 01:43:31,260 Or we just adding a foot on top of it and raising the bed 542 01:43:31,260 --> 01:43:38,200 Now we'll be removing everything that's there bringing in a new new section and there are some areas that we 543 01:43:38,200 --> 01:43:41,960 to state having to do some soil correction below that one foot section. 544 01:43:42,220 --> 01:43:46,520 Or absolutely sure if you only do one foot of sand that you're getting in a nine-ton 545 01:43:46,520 --> 01:43:46,800 roll. 546 01:43:47,400 --> 01:43:53,340 So, yeah, we'll have a design section, now certainly that could be modified in the field. 547 01:43:53,640 --> 01:43:59,500 So, typically we'll build in some subgrade correction, we'll build in some contingency in 548 01:43:59,500 --> 01:44:07,300 the event that we have to do some additional correction, but yeah, again, I've been 549 01:44:07,300 --> 01:44:19,880 Working on these roads in this community for a very long time and the best remedy for our heavy clay soils in order to produce a road that's going to last is to have that sand section underneath there. 550 01:44:20,600 --> 01:44:22,660 But we don't want to put any more than we need. 551 01:44:23,660 --> 01:44:33,320 So if we're doing that road construction with the extra sand, I could see there's an added cost, but I don't see it as being astronomical. 552 01:44:33,320 --> 01:44:46,540 Yeah, it might be a reasonable added, particularly when you have a willing landowner, if you didn't have a, if you had to purchase the lander relocated, then you'd really be into some more significant dollars. 553 01:44:48,140 --> 01:44:56,300 But, you know, that, again, that certainly something we couldn't give you a ballpark on. I'm not going to design both, but at least give you a speaking of these shifts. 554 01:44:56,400 --> 01:44:57,280 Frame of reference. 555 01:44:57,380 --> 01:44:59,960 Getting back to the shift by the. 556 01:45:00,590 --> 01:45:13,830 New the 43 intersection. I mean, it hasn't been established that that intersection is going to have to be rebuilt, because it will be problematic, with either wrong about or something. 557 01:45:14,950 --> 01:45:20,330 And therefore the intersection is going to be rebuilt, and so the road is going to end up being somewhat aligned no matter what. 558 01:45:20,970 --> 01:45:28,750 So, so what we'll take a look at, if, if, when we start looking at this section more closely with development, we have the county's alignment. 559 01:45:30,330 --> 01:45:43,190 Now, if this city were to say, yes long term, this is going to be a county road, then, then we're probably going to recommend that we try to acquire the right away for what the county's envisioned alignment was there. 560 01:45:43,190 --> 01:45:46,490 They were looking at a 55 mile in our design speed. 561 01:45:46,670 --> 01:45:50,650 We would like that likely kick that down from 55 as the city street. 562 01:45:51,630 --> 01:45:57,310 So these curves here, I don't have the county's design in front of me, but the curves 563 01:45:57,310 --> 01:46:04,050 in this location were getting lengthened horizontally because of that 55 mile in our design 564 01:46:04,050 --> 01:46:04,370 speed. 565 01:46:04,850 --> 01:46:09,730 So we take a look at the counties, we take a look at a lower design speed, take a look 566 01:46:09,730 --> 01:46:16,730 what we think the right way needs are for a city street and then fit that all in there and see 567 01:46:16,730 --> 01:46:22,770 see how it looks. So that's certainly something that if authorized we could also have SRF 568 01:46:22,770 --> 01:46:27,070 start looking at it a little bit more closely if you want to understand how that might shift. 569 01:46:27,370 --> 01:46:31,950 Alternatively we could wait till a developer comes forward and then do the work in conjunction 570 01:46:31,950 --> 01:46:39,430 with the developer. And I would like to I'd like that idea better once the developer comes 571 01:46:39,730 --> 01:46:48,190 We just, we just paved up to the development and then that road do the repairs that we need 572 01:46:48,190 --> 01:46:52,590 until such time as a developer comes in and then that can be finished off. 573 01:46:52,770 --> 01:46:58,210 But this is, this is, we've had buyers on this reoccurring over time. 574 01:46:59,450 --> 01:47:04,490 So what does necessarily fire in the future that there might be, you know, the development? 575 01:47:04,810 --> 01:47:07,950 It could be, it could be, you know, next week somebody calls me. 576 01:47:07,950 --> 01:47:12,610 The differences is, you know, we now have a better idea of what project the city's moving 577 01:47:12,610 --> 01:47:16,870 forward and we got some feedback on the future county road question. 578 01:47:17,450 --> 01:47:22,330 So I have more information today than I did three weeks ago if a developer were to call. 579 01:47:25,320 --> 01:47:31,440 But yeah, realistically, I mean, again, starting a dial into that a little bit is not, 580 01:47:31,440 --> 01:47:34,080 we're not talking about significant engineering dollars. 581 01:47:34,080 --> 01:47:39,740 It's me getting some feedback from MasterF and providing some professional judgment. 582 01:47:40,660 --> 01:47:42,400 So I want to talk a little bit about the trail. 583 01:47:42,840 --> 01:47:46,800 So there is not any trail currently along this corridor at all. 584 01:47:47,700 --> 01:47:50,040 So we would be constructing the first trail. 585 01:47:50,480 --> 01:47:56,480 And it just connects at this point on either end of the of the corridor. 586 01:47:56,740 --> 01:48:01,300 And there's no trail connections that come in correct at this point. 587 01:48:01,300 --> 01:48:09,200 Now, this trail, I and would scold me if I didn't note that this trail is part of the county's regional trail system. 588 01:48:09,840 --> 01:48:15,720 So, the county's plan calls for a 10-foot wide trail along Marshley Road. 589 01:48:16,180 --> 01:48:22,440 Now, that was developed in conjunction with the fact that this was also going to be a county road. 590 01:48:23,020 --> 01:48:27,580 So, you know, typically we put 10 foot wide trails. 591 01:48:27,580 --> 01:48:37,060 10-ton. 10-foot wide trails along county roads. Our city standard trail is 8 feet. But yeah, 592 01:48:37,420 --> 01:48:45,720 so it ultimately will connect into this trail system that comes up through here. We need some 593 01:48:45,720 --> 01:48:53,720 boardwalk up through here and then ends not here, but it ties into the Chaska Trail down to 594 01:48:53,720 --> 01:48:58,720 whatever is over here. I'm kind of useless once we hit the system going through 595 01:49:00,400 --> 01:49:03,560 Glendars area, isn't it? Yeah, so the city has... 596 01:49:03,560 --> 01:49:05,980 And Marshall Lake Road as soon as this is developed. 597 01:49:06,500 --> 01:49:12,400 Now the city did require the construction of a local trail system through all of these neighborhoods, 598 01:49:12,700 --> 01:49:19,200 so there's an existing trail that comes through here that will tie into Wasserman Park. 599 01:49:19,200 --> 01:49:26,280 We use this way back through and pops out somewhere and then it's on road and then it comes back 600 01:49:26,680 --> 01:49:29,220 through here and 601 01:49:29,220 --> 01:49:31,980 then up along here and then 602 01:49:33,100 --> 01:49:39,680 ties in to like town tenth and then also back into the school system. So there is 603 01:49:40,500 --> 01:49:44,060 internal trail. I've developed it. They'll be a trail through there and 604 01:49:44,060 --> 01:49:49,660 Right now, there's a trail through a userman area of developments that will go up to 605 01:49:49,660 --> 01:49:50,700 Westman Park. 606 01:49:51,420 --> 01:49:54,400 So you'd be able to go from this trail up to Westman Park. 607 01:49:54,620 --> 01:49:54,880 Correct. 608 01:49:56,120 --> 01:49:57,500 This whole neighborhood, I'm doing. 609 01:49:57,920 --> 01:49:58,820 The whole neighborhood. 610 01:50:00,000 --> 01:50:24,460 The public can't see where you're pointing. The whole neighborhood that Lenar's done has trails in it, so they can get 243 or a lot of their own neighborhood. They don't have to come down to marsh Lake road to do that. Personally, I think we need to wait on that trail because we have other trails that need to be taken care of. And we're not connecting to anything yet. 611 01:50:24,460 --> 01:50:32,980 Yeah, the other thing I didn't note with the know trail option is certainly in these areas where you have undeveloped land. 612 01:50:34,200 --> 01:50:41,040 You could shift the responsibility of construction of the trail adjacent to the corridor onto the developer. 613 01:50:41,620 --> 01:50:52,020 Similar to what we do along Connie wrote 11 and other Connie corridors so we can create more trail gaps through development. 614 01:50:52,020 --> 01:50:56,860 but that, you know, that would be an alternative to start to build that trail and that work. 615 01:50:57,340 --> 01:51:05,380 I'm from the opposite side of the school of thought here. This trail, if it's not completed 616 01:51:05,380 --> 01:51:12,200 and it's done herky jerky, trail connections, the prices on a small trail connection started at 617 01:51:12,200 --> 01:51:19,080 a half million. And we've got a dozen of them, 12, 15 of them identified, each of them's 618 01:51:19,080 --> 01:51:24,900 to be probably in that range. So we can only do in the next couple of years. We can do in the next 619 01:51:24,900 --> 01:51:30,320 five years. We can do one or two trail connections. That's all we can afford. That's separate 620 01:51:30,320 --> 01:51:35,600 funding. There's a separate funding for trail connections. There's basically very little 621 01:51:35,600 --> 01:51:41,760 separate funding for trails per se. All of the major thoroughfares that this city has built 622 01:51:41,760 --> 01:51:52,220 last 10 years, 15 years, 86th Street, 70th Street, Slash Cochia, Smith-Town Lane, and if 623 01:51:52,220 --> 01:52:00,520 you consider County Road 18 or Rolling Hills, we've put in, in most cases with the exception 624 01:52:00,520 --> 01:52:08,760 of Rolling Hills as a small problem, we put in trails. So we've built them in every neighborhood 625 01:52:08,760 --> 01:52:12,980 that has a straight thoroughfare that's about this long. 626 01:52:13,840 --> 01:52:19,200 86th Street, 78th Street, Smithtown Lane, they're all about this long. 627 01:52:19,600 --> 01:52:23,140 They all have trails that were put in when the street was done. 628 01:52:24,020 --> 01:52:25,460 So what it is, are precedent. 629 01:52:26,260 --> 01:52:30,920 And the idea of that you can just save this 1.5 billion 630 01:52:30,920 --> 01:52:34,140 by not doing the trail right now. 631 01:52:34,720 --> 01:52:41,180 I would submit that the cost of doing this trail piecemeal is going to be a lot more than 1.5 million. 632 01:52:42,360 --> 01:52:51,180 I'm blessed it's going to come very erratically and very, it'll be almost useless until it's completely done. 633 01:52:52,020 --> 01:52:54,200 So I'm not in favor of skipping the trail. 634 01:52:54,540 --> 01:53:01,320 I think it's an investment that we have to do, and we have a precedent for doing it. 635 01:53:01,320 --> 01:53:08,240 We, we'll drive down if you want. We'll drive down all the streets in this town that we've built with trails on them. 636 01:53:09,260 --> 01:53:19,560 I'm in favor of doing a trail as well. I think that we do, we don't want to exacerbate a problem that we already have in the city by not doing a trail. 637 01:53:20,160 --> 01:53:23,600 And it will always be more expensive to come back and do it again. 638 01:53:23,960 --> 01:53:25,280 I'd say it's twice as expensive. 639 01:53:25,880 --> 01:53:30,880 And there's nothing more frustrating than not spending your text dollars wisely. 640 01:53:31,460 --> 01:53:36,700 Well, the trail, the trail connections that aren't getting done, those are kind of more and more all the time. 641 01:53:37,320 --> 01:53:40,160 How do you justify that? 642 01:53:40,400 --> 01:53:45,140 We've set up a county mechanism to save money for the trail connections. 643 01:53:45,620 --> 01:53:49,960 We'll take that, a million and a half and do three trail connections. 644 01:53:51,280 --> 01:53:52,200 This is different. 645 01:53:52,520 --> 01:53:52,900 This is different. 646 01:53:52,900 --> 01:53:53,080 You can. 647 01:53:53,480 --> 01:53:54,260 Trail connections. 648 01:53:54,700 --> 01:53:57,360 We just spend it in different places what Judy is suggesting. 649 01:53:58,060 --> 01:54:03,800 Yeah, I should note that the budget only includes 2.5 million, so you would need an additional 650 01:54:03,800 --> 01:54:07,180 million from somewhere else in the budget. 651 01:54:09,560 --> 01:54:18,460 So that's a careful budget though, it's not, is there 2.5 million sitting in some accounts 652 01:54:18,460 --> 01:54:18,900 somewhere? 653 01:54:19,500 --> 01:54:19,720 No. 654 01:54:19,860 --> 01:54:21,700 So it's closing the line for the budget. 655 01:54:28,720 --> 01:54:31,580 So I've been sitting here to listen to this discussion. 656 01:54:32,700 --> 01:54:38,900 I think we need to step back for a second and remember what the objective here was. 657 01:54:39,540 --> 01:54:43,380 When this council unanimously voted to keep it a city road, 658 01:54:44,460 --> 01:54:49,800 the discussions all at that time was I think there's two key points that I think is worth repeating now. 659 01:54:50,640 --> 01:54:56,680 Number one is this is a temporary road in the sense that eventually it will become a economy road. 660 01:54:56,680 --> 01:54:59,740 20, 30 years at some point in the future it will become a county road. 661 01:55:00,840 --> 01:55:17,600 Therefore, if we start putting in, like, from, we did agree on a nine-ton road, but if we start putting in all of these additional things we put in the trail, that stuff is probably for the most part going to be ripped out in 20 years. 662 01:55:17,600 --> 01:55:26,780 The other thing too is we talked about, at least I talked about, where as development goes south out of Victoria, 663 01:55:28,920 --> 01:55:43,980 and properties connect up to marsh lake road at that time, we can always direct staff to enter into negotiations with the villagers to acquire additional right away, to provide room for future road, because the road will have to be improved at some point. 664 01:55:43,980 --> 01:55:49,300 The same thing goes for the south side, where it's like town township, as the annexation occurs. 665 01:55:50,400 --> 01:55:59,120 We can negotiate additional right away at that point where we were not trying to force the acquisition, but we can pick it up. 666 01:55:59,220 --> 01:56:04,600 And I cite as an example, just west of Jeremy Rock's property. 667 01:56:05,220 --> 01:56:09,780 We've already got a berm built, and there's been no formal road design. 668 01:56:09,780 --> 01:56:12,360 And don't we have a burn and a part of that? 669 01:56:12,420 --> 01:56:17,280 If you'd point that on in the map, so this has already been done without a road design. 670 01:56:17,920 --> 01:56:23,460 And we last Monday, this council voted not to complete that road design. 671 01:56:23,600 --> 01:56:28,140 So the point I'm getting to is, I don't think we should put the trail in. 672 01:56:28,220 --> 01:56:33,400 I don't think we should do the burn lights or anything else simply because of the cost 673 01:56:33,400 --> 01:56:39,400 and this road was designed to get us to the point where 20 years from now we can either 674 01:56:40,340 --> 01:56:53,320 improve it because the growth will require it, that time it could be sanitary sewer could be the by that time we may also have a lot more of the land acquired and I want to minimize the cost here. 675 01:56:53,800 --> 01:56:59,340 I simply want to if if if I could convince this council to do it, I don't even want to do a nine-ton grow. 676 01:56:59,460 --> 01:57:04,620 This road has been driven on for 50 years. I just want to pay it where it exists right now. 677 01:57:04,620 --> 01:57:11,020 I'm also concerned that if we, if we act we yet act we ask and spend the taxpayer's money 678 01:57:11,020 --> 01:57:15,020 because one resident asked to have the road moved, what are we going to tell the residents 679 01:57:15,020 --> 01:57:20,680 on the West End when they come in and say, well, I want you to look at this too, that doesn't make 680 01:57:20,680 --> 01:57:26,940 a lot of sense here. That road was there when they bought the house. I think what we ought to do 681 01:57:26,940 --> 01:57:33,860 is minimize the cost here wherever possible, paved the road and be done with it, knowing full 682 01:57:33,860 --> 01:57:36,980 Well, at 20 years, this is all going to be read down in 20, 25 years. 683 01:57:37,100 --> 01:57:44,800 At least at that point, I'll have a better sense for growth development and need because 684 01:57:44,800 --> 01:57:49,120 there's still debate and argument as to whether or not the traffic flow is going to warrant 685 01:57:49,120 --> 01:57:50,780 a county road at that time. 686 01:57:51,220 --> 01:57:59,340 As part of this process, I think last Monday, I think we actually ought to, if in fact, we 687 01:57:59,340 --> 01:58:03,640 keep it a city road and we've got the complaint that goes out 20 years and we're going 688 01:58:03,640 --> 01:58:08,520 build some sort of a road at least for 20 years, we should actually go back and revisit the fact 689 01:58:08,980 --> 01:58:14,720 that we voted not to change the complaint and I actually voted for that. And in a rest respect, 690 01:58:14,920 --> 01:58:18,200 I think we need to change it. I think we need to tell the county that, no, we're going to keep 691 01:58:18,200 --> 01:58:24,160 this a city road. At least for the next in this complaint, which is 20 years, we're not going 692 01:58:24,160 --> 01:58:29,960 to change it. We've already decided that. So I disagree. I think we need to minimize the actual costs 693 01:58:29,960 --> 01:58:37,320 here into Council Member Black's comments, the million and a half bucks give or take that would 694 01:58:37,320 --> 01:58:42,800 be put into putting a trail on just this road based on the budget discussion earlier tonight 695 01:58:42,800 --> 01:58:48,100 from Trish. I can't remember the figures exactly, but I think the first three priorities 696 01:58:48,100 --> 01:58:53,380 that came out of the Park and Rack, which admittedly this council hasn't decided on yet, 697 01:58:53,620 --> 01:58:57,480 but if you took, I think the total cost of all those is I did a quick addition to my head 698 01:58:57,480 --> 01:59:02,500 like a little over a million dollars. So we're talking about 1.5 million for a trail here that 699 01:59:02,500 --> 01:59:06,340 we're going to rip out in 20 years, or we can spend a little bit less money and actually make 700 01:59:06,340 --> 01:59:12,360 three trail connections where they need to be made already. So consult comments, Mr. Gregory. 701 01:59:13,560 --> 01:59:14,320 Thank you. 702 01:59:16,540 --> 01:59:22,580 I tend to agree with the council member vote. No one that building a trail now is 703 01:59:22,580 --> 01:59:31,080 cheaper than trying to piece mell it in later. However, last week I think the county made it pretty 704 01:59:31,080 --> 01:59:38,060 clear. They still want to keep their foot in the door as keeping this in their comp 2040 plan 705 01:59:38,060 --> 01:59:45,280 as a county road. So they haven't given up on it and we did direct staff to talk to them. So we're kind 706 01:59:45,280 --> 01:59:54,420 going on a little bit of a dual track mode here, and I would like to hear them out to see 707 01:59:54,420 --> 01:59:59,500 what their thoughts are as far as making this into a county road at some point. 708 02:00:00,000 --> 02:00:01,100 The future. 709 02:00:03,440 --> 02:00:08,700 I did agree to a nine-time road because I think this road will be here for a significant 710 02:00:08,700 --> 02:00:19,000 amount of time. And the notion of, and I agree with the mayor, if we were to spend all this money 711 02:00:19,000 --> 02:00:25,240 to put this trail in, build all of these retaining walls. There is a good chance that at some point 712 02:00:25,240 --> 02:00:31,140 county would want to reconstruct this and build their their county road system at that point. 713 02:00:31,600 --> 02:00:32,960 All of that would be ripped out. 714 02:00:36,220 --> 02:00:40,940 So I am a little bit torn, but I would like to hear the county 715 02:00:40,940 --> 02:00:47,400 out a little bit and see what they are proposing as far as keeping their foot in the door 716 02:00:47,400 --> 02:00:53,550 is making this into a county road. But as of tonight, if we had to make a decision, I would go 717 02:00:53,550 --> 02:00:54,550 without a trail. 718 02:00:57,250 --> 02:00:59,430 All right, so who's going to pay the cost that we're 719 02:00:59,430 --> 02:01:03,950 going to spend because of a Jeremy Rocks request? 720 02:01:04,270 --> 02:01:07,450 Do you think the taxpayers, let's focus on that one issue right now? 721 02:01:07,690 --> 02:01:09,770 Should the taxpayers pay for that? 722 02:01:10,230 --> 02:01:12,450 And how it doesn't that say that dangerous precedent 723 02:01:12,450 --> 02:01:15,130 for other homeowners when they don't 724 02:01:15,130 --> 02:01:16,870 like the alignment of a road someplace? 725 02:01:18,030 --> 02:01:19,430 I think he's asking Mr. Reyer. 726 02:01:19,610 --> 02:01:22,930 He's asking us to, for all part, the cost that would be. 727 02:01:22,930 --> 02:01:26,210 And then pursue discussion after that. 728 02:01:26,650 --> 02:01:27,950 Right, that's what he's asking, but there's 729 02:01:27,950 --> 02:01:29,310 cost associated with that. 730 02:01:29,790 --> 02:01:33,670 So are we willing to bear that shift that cost to the taxpayer? 731 02:01:34,790 --> 02:01:37,110 And then we just defined the answer, is that correct? 732 02:01:37,710 --> 02:01:42,510 And then we don't, I mean, was it 50 grand, 100 grand, 2,000, 200,000? 733 02:01:42,570 --> 02:01:45,710 We don't know how much it would cost to move the road and actually put the road 734 02:01:45,710 --> 02:01:46,370 bit up there. 735 02:01:46,590 --> 02:01:51,150 My point is, do we actually do that for a single resident that 736 02:01:51,150 --> 02:01:57,710 have it moved, right? If the, what's to say the people in the West End aren't going to come back and say, 737 02:01:58,050 --> 02:02:04,950 well, I want you to move it here, what's it going to cost to move it here too, right? So I just think we open up a 738 02:02:04,950 --> 02:02:09,490 dangerous precedent that every time we get another request or we're going to go ahead and tell that 739 02:02:09,490 --> 02:02:14,110 resident then okay, we'll go spend money and look at that request too. At some point we have to make a decision here. 740 02:02:14,870 --> 02:02:23,050 I asked before the meeting tonight, we spent, we the city that is between SRF and Focus 741 02:02:23,050 --> 02:02:23,550 Engineering. 742 02:02:23,770 --> 02:02:25,730 This has been going on since 2016. 743 02:02:26,310 --> 02:02:30,030 I know just after I was sworn in, I can't remember if it's January or February of 744 02:02:30,030 --> 02:02:30,470 17. 745 02:02:31,410 --> 02:02:36,890 I was presented with a plan for the West End, the meat cutters property that showed the 746 02:02:36,890 --> 02:02:42,950 road completely redone, which would have solved all the problems on the West End of the 747 02:02:42,950 --> 02:02:45,330 and this whole question about marsh lake road. 748 02:02:46,590 --> 02:02:48,690 Why that development was allowed to go in? 749 02:02:49,170 --> 02:02:53,690 As it was built, I can only think that this was everybody. 750 02:02:54,090 --> 02:02:58,210 It said, we're going to move this road, but that never occurred. 751 02:02:59,830 --> 02:03:04,810 It makes me wonder how I was able to, I was actually provided diagrams 752 02:03:04,810 --> 02:03:07,690 that showed the road move with a whole new development in there 753 02:03:07,690 --> 02:03:11,570 and that marsh lake road property almost if it was a done deal. 754 02:03:11,570 --> 02:03:13,590 Well, it wasn't a done deal. 755 02:03:14,350 --> 02:03:15,750 So, and that was three years ago. 756 02:03:15,850 --> 02:03:17,770 We've had all sorts of people look at the marsh lake property. 757 02:03:17,870 --> 02:03:19,210 We don't know what's going to happen down there. 758 02:03:19,830 --> 02:03:22,890 I'm just opposed to putting any more money into marsh lake road 759 02:03:22,890 --> 02:03:28,630 beyond what's required to pay it and get it so that we can use it in the public 760 02:03:28,630 --> 02:03:29,970 can use it for 20 years. 761 02:03:30,630 --> 02:03:33,290 If you want a nine-ton road and it's not going to cost that much. 762 02:03:33,430 --> 02:03:34,770 We've got the estimate fine. 763 02:03:35,370 --> 02:03:36,170 I can agree to that. 764 02:03:36,590 --> 02:03:41,250 But I think the trail and any other adjustments is just added cost that we throw away 765 02:03:41,250 --> 02:03:45,430 in 20 years, and to Council Member Black's point, 766 02:03:46,010 --> 02:03:47,750 I think we could spend, if we're gonna spend, 767 02:03:48,090 --> 02:03:50,270 and decide to do that, we don't have funds for any of this, 768 02:03:50,370 --> 02:03:54,170 but if we're gonna borrow money and go work on trails, 769 02:03:55,290 --> 02:03:57,330 to me, if we fix those, 770 02:03:59,230 --> 02:04:00,450 do we have a hard copy of packet, 771 02:04:00,830 --> 02:04:02,730 do we know how much of those three trails were 772 02:04:02,730 --> 02:04:05,310 that was in Trish's presentation earlier? 773 02:04:05,750 --> 02:04:07,170 The hard copy is over there. 774 02:04:07,170 --> 02:04:11,650 All right, for sake of argument, just say it was like two trails. 775 02:04:12,490 --> 02:04:15,030 There were three in the budget. 776 02:04:16,290 --> 02:04:18,510 For sake of argument, let's just say it was 1.2 million. 777 02:04:19,310 --> 02:04:22,850 So a little bit of less money for connecting three trails, 778 02:04:23,110 --> 02:04:26,850 versus building one trail that doesn't connect on either end 779 02:04:26,850 --> 02:04:30,170 in whom no long, how long it's going to take before it actually connects. 780 02:04:30,250 --> 02:04:32,670 I'd rather connect the three trails for less money 781 02:04:32,670 --> 02:04:35,250 and that benefits probably a lot more residents 782 02:04:35,250 --> 02:04:40,670 in sheer number of homes and neighborhoods, then this one trail where we have what maybe 783 02:04:40,670 --> 02:04:42,390 it doesn't homes along much like road. 784 02:04:43,810 --> 02:04:45,790 So I'm opposed to the trail. 785 02:04:45,850 --> 02:04:47,630 I want to keep the cost as low as possible. 786 02:04:49,760 --> 02:04:54,400 What's the lifespan of the nine-ton road that we anticipate? 787 02:04:58,960 --> 02:05:00,000 So typically... 788 02:05:00,000 --> 02:05:06,560 People will talk about roads with a 20-year design life. So that would be typical. We are seeing roads that have our 789 02:05:06,560 --> 02:05:14,880 sand section underneath it are performing longer. So the base itself, we hope to get 50 years out 790 02:05:14,880 --> 02:05:21,000 of it for the roads that we've built new in the new neighborhoods. We're hoping to not have to revisit 791 02:05:21,000 --> 02:05:26,420 that base for 50 years, but only have to revisit the gravel in the asphalt on the top. So it's effectively 792 02:05:26,420 --> 02:05:33,040 up to a 50 year life. I think all of the nine times. All of the discussion we heard at the 793 02:05:33,040 --> 02:05:38,560 last meeting especially from the residents and having done their research is that the likelihood 794 02:05:38,560 --> 02:05:47,560 of needing a county road is not 20 years off. It's 30 years, 40 or 50. So we should build something 795 02:05:47,560 --> 02:05:54,840 that's going to last, you know, and where we wait in 30, 40 years to get a trail, 796 02:05:56,880 --> 02:05:58,380 I go back 797 02:05:59,420 --> 02:06:05,100 to meeting this thing to death. Our precedent is that we put the trail in when we do a road. 798 02:06:06,800 --> 02:06:10,420 Well, the other thing, too, it counts remember Black pointed out all of those neighborhoods in 799 02:06:10,420 --> 02:06:14,580 Victoria. They're all connected to the trail system through the neighborhoods. So it's not like they're 800 02:06:14,580 --> 02:06:18,320 connected already. The only difference is that we just want to have a trail along marsh Lake. 801 02:06:18,320 --> 02:06:23,720 This one will be connected in two places, be connected through an hour and it's connected to 802 02:06:23,720 --> 02:06:27,960 the wasumen neighborhood. Right? But if we don't build a trail they can still get to downtown 803 02:06:27,960 --> 02:06:32,320 and they're still connected to the trail system. You just don't have a trail along marsh Lake road. 804 02:06:32,500 --> 02:06:36,980 That'll put those bikes on people on the roads then and now it's the safety issues. 805 02:06:37,820 --> 02:06:43,620 The bikes of the marsh Lake road residents? No, anybody who wants to go on and get to the other trail 806 02:06:43,620 --> 02:06:50,810 system. No, they can go through the neighborhoods. They can't go through the neighborhoods and get to 807 02:06:51,340 --> 02:06:56,220 paint a trail to go into Alaska. These bikers go everywhere. 808 02:06:59,140 --> 02:07:03,860 Well, they do. I just don't think that the 1.5 million is worth it. If we're going to spend 1.5 809 02:07:03,860 --> 02:07:08,080 million on trails, I just think we can get more bang for the buck and other parts of the city. 810 02:07:08,080 --> 02:07:13,640 So, and I think we have to take a bird's eye view of this, right? 811 02:07:13,740 --> 02:07:15,120 I'd love to be able to build a trail. 812 02:07:15,300 --> 02:07:16,100 I supported it first. 813 02:07:16,240 --> 02:07:19,340 I wanted to look at the cost too, but now that we have the cost, I just think it's 814 02:07:19,340 --> 02:07:20,100 cost-evitative. 815 02:07:21,040 --> 02:07:26,540 So, we have to, we have to make some decisions here tonight, and we clearly have a split 816 02:07:26,540 --> 02:07:27,900 in the council, which is fine. 817 02:07:28,660 --> 02:07:30,440 Do we have resolutions with this, care? 818 02:07:31,200 --> 02:07:31,340 No. 819 02:07:32,900 --> 02:07:37,920 All right, so, I don't want to cut off discussion if there's further 820 02:07:37,920 --> 02:07:44,020 discussion, but if not, then we need to make some decisions in order to do so. 821 02:07:44,080 --> 02:07:48,620 I would ask that we have a motion on what councilmember wants to make a decision. 822 02:07:49,640 --> 02:07:55,020 So, I want to bring one thing up, and that is, I move that we actually do amend the 823 02:07:55,020 --> 02:08:04,240 comprehensive plan to nominate March Lake Road as a city road. Is there a second? 824 02:08:04,240 --> 02:08:13,900 Second, we have a valid second discussion on this. All in favor signify by saying aye. Aye. All opposed? 825 02:08:13,900 --> 02:08:19,260 All right, so that motion now carries three four two are yet. 826 02:08:19,620 --> 02:08:19,760 Three. 827 02:08:22,120 --> 02:08:24,220 Three four two against. 828 02:08:26,840 --> 02:08:27,640 So. 829 02:08:29,080 --> 02:08:31,160 The motion does carry. 830 02:08:31,160 --> 02:08:37,640 We are going to modify the comprehensive plan to annotate marsh lake road as a city road. 831 02:08:40,080 --> 02:08:43,760 Would another council member like to make another motion related to this? 832 02:08:47,340 --> 02:08:48,440 Did you want to do that? 833 02:08:49,000 --> 02:08:52,340 Do you want a motion to authorize final design from marsh lake road? 834 02:08:52,760 --> 02:08:56,380 I make a motion to authorize final design from marsh lake road with a trail. 835 02:08:57,060 --> 02:08:58,060 Is there a second please? 836 02:08:58,240 --> 02:08:58,960 Second motion. 837 02:08:59,800 --> 02:09:00,320 Discussion. 838 02:09:00,640 --> 02:09:02,580 The council is any further discussion? 839 02:09:02,580 --> 02:09:09,580 Yeah, much like a question, Cara, we've got a half million dollars in retaining walls here. 840 02:09:10,780 --> 02:09:16,500 That's a big number and you mentioned that we may not need hardly any of those. 841 02:09:16,860 --> 02:09:19,540 Um, I, you know, I don't know, maybe half. 842 02:09:20,040 --> 02:09:20,440 Okay. 843 02:09:20,560 --> 02:09:22,200 But it really depends on the landowners. 844 02:09:22,420 --> 02:09:28,100 So I don't want to presuppose the landowners are just seeing the alignment. 845 02:09:28,240 --> 02:09:28,660 Right. 846 02:09:28,660 --> 02:09:32,660 So first time, so we haven't had any conversation about that. 847 02:09:33,900 --> 02:09:34,700 I had a question. 848 02:09:35,040 --> 02:09:35,160 Right. 849 02:09:35,980 --> 02:09:40,720 With those retaining walls, is that going to affect the farm equipment? 850 02:09:42,920 --> 02:09:49,800 Yeah, certainly if we were moving forward with the trail, we'd want to spend some time with the landowners in all of those areas. 851 02:09:49,900 --> 02:09:52,900 And that would be typical as part of a final design process. 852 02:09:53,100 --> 02:09:58,320 We would meet with the adjacent landowners and take a look at if they're willing to let us grade. 853 02:09:58,320 --> 02:09:59,960 we'd have to show them how much we'd need it. 854 02:10:00,000 --> 02:10:11,820 Great to avoid the walls. Our goal, of course, would be to minimize walls at all costs because they're expensive and somebody's going to maintain them. So, the first goal is to not have them, but sometimes they're unavoidable. 855 02:10:13,420 --> 02:10:14,080 Further discussion? 856 02:10:15,160 --> 02:10:21,240 Okay, so we have a valid motion for authorizing final design from our select road with a trail. 857 02:10:21,540 --> 02:10:22,220 Is that correct? 858 02:10:22,420 --> 02:10:23,020 Yes. 859 02:10:23,500 --> 02:10:25,240 All in favor, signify by saying aye. 860 02:10:26,300 --> 02:10:28,620 All opposed signify by saying nay. 861 02:10:29,220 --> 02:10:29,400 No. 862 02:10:30,300 --> 02:10:31,700 Motion does not carry. 863 02:10:32,020 --> 02:10:33,480 It fails three to two. 864 02:10:34,420 --> 02:10:40,380 I move that we've authorized final design from our select road is a nine-ton road without a trail. 865 02:10:40,980 --> 02:10:41,560 Is there a second? 866 02:10:41,840 --> 02:10:42,180 Second. 867 02:10:43,000 --> 02:10:43,340 Discussion? 868 02:10:44,980 --> 02:10:51,340 hearing no further discussion. All in favor signify by saying aye. Aye. Aye. All opposed? No. 869 02:10:51,340 --> 02:10:57,080 The motion carries three to two. Send to you have that. Okay. 870 02:10:57,340 --> 02:11:03,040 Cara, is there other issues or related to marshlight road that we need to discuss? 871 02:11:03,980 --> 02:11:13,280 I based on the motion. So just so there's clarity on my mind. We would be proceeding with final design as it was presented here tonight. 872 02:11:13,280 --> 02:11:19,820 If the council wishes to direct us to add any additional scope, from these items listed here, 873 02:11:20,900 --> 02:11:24,480 like alignment revisions, I'd be looking for specific direction for that. 874 02:11:24,620 --> 02:11:26,900 If there's something the council wants us to look at. 875 02:11:27,020 --> 02:11:32,720 So, council, is there anything that anybody wants to make a motion or add any additional guidance? 876 02:11:33,140 --> 02:11:33,280 Mr. Garer? 877 02:11:33,440 --> 02:11:34,060 Mr. Garer? 878 02:11:34,220 --> 02:11:38,400 How much would it cost to get an estimate to re-align the road? 879 02:11:38,400 --> 02:11:46,570 Jeremy Rocks. I don't think a lot of money. I mean, I don't we're trying about a couple hours of 880 02:11:47,140 --> 02:11:54,220 handful of hours from SRF, a hour or two of my time to review that work. So let me get a, I want a point of clarity. 881 02:11:55,140 --> 02:12:01,490 Only a few hours to to be able to give the council an estimate of what would cost to act assuming they agreed to 882 02:12:01,490 --> 02:12:07,290 realign the road. Okay, so it's only a few hours then. No, yeah, and that's information I certainly 883 02:12:07,290 --> 02:12:12,470 would anticipate being able to bring back at the next council meeting that you then could 884 02:12:12,470 --> 02:12:17,970 provide direction on, whether it's early in the final design process, where it wouldn't, you know, 885 02:12:18,790 --> 02:12:24,330 consulting wasted. Based on previous discussion, my council jump in if I'm wrong, 886 02:12:24,590 --> 02:12:30,290 four of you supported. And if it's only a few hours, I'll support it too. And so without objection 887 02:12:30,290 --> 02:12:36,430 from the council, go ahead and get an estimate on the cost to move the road north as requested 888 02:12:36,430 --> 02:12:37,470 by Jeremy Rock. 889 02:12:37,950 --> 02:12:39,530 And you said that's only a few hours, right? 890 02:12:39,530 --> 02:12:39,930 Correct. 891 02:12:39,930 --> 02:12:40,310 The cost. 892 02:12:40,630 --> 02:12:41,090 All right, incident. 893 02:12:41,590 --> 02:12:45,890 One other thing just popped in my head that I think we have to do here in the council, we need 894 02:12:45,890 --> 02:12:46,990 a vote on it. 895 02:12:47,150 --> 02:12:54,010 And that is, because we changed tonight the comprehensive plan to a city road, believe we now 896 02:12:54,010 --> 02:13:00,290 need to direct staff that during the act was either during the annexation process or during 897 02:13:00,290 --> 02:13:08,030 the development process on the Victoria side that we actually direct city staff to work 898 02:13:08,030 --> 02:13:12,730 with county staff before the process because it was always a county road that was included 899 02:13:12,730 --> 02:13:20,010 now it's not since we have a disconnect so therefore I move that we direct city staff during the 900 02:13:20,010 --> 02:13:25,450 the development process and the Victoria side and the annexation process on the Lake Town 901 02:13:25,450 --> 02:13:31,910 Township side to work with County as part of that process for development of acquiring 902 02:13:31,910 --> 02:13:38,770 right away. Can I get a second to that motion please? Second. Discussion. The reason I made that 903 02:13:38,770 --> 02:13:49,550 motion is because before it was automatic, as long as the council kept the plan to say it was 904 02:13:49,550 --> 02:13:55,250 motion in order to direct staff to still continue to discussions with the county as we do the 905 02:13:55,250 --> 02:14:01,050 acquisition hence the motion. So that was why I made the motion council any further discussion 906 02:14:01,050 --> 02:14:08,590 on that motion. Hearing none, all in favor signify by saying aye, aye, all opposed. Okay, that motion 907 02:14:08,590 --> 02:14:09,630 carried unanimously. 908 02:14:11,650 --> 02:14:18,210 Cindy, did you get that? Is there any other guidance then? Anything else you 909 02:14:18,210 --> 02:14:22,570 from the council? Not unless the council wants to provide any other guidance on any of these 910 02:14:22,570 --> 02:14:27,550 issues. I have what I need, but if you, you know, want me to look at any of these other things, 911 02:14:27,550 --> 02:14:32,330 I would prefer to be directed to. Wait if this question is familiar, go ahead and we find out 912 02:14:32,330 --> 02:14:37,710 from some anyone how long changing the comprehensive plan takes. Yeah, absolutely. 913 02:14:39,770 --> 02:14:40,430 There's a 914 02:14:40,430 --> 02:14:44,690 process you will have to go to the best council and go under all of certain process. 915 02:14:45,370 --> 02:14:50,590 Council member vote, but Mayor members of the council, yes, they're certainly a process to go through. 916 02:14:51,690 --> 02:14:55,830 So I don't, it's very prescriptive and I don't have that information in front of me. 917 02:14:56,050 --> 02:14:59,970 But yeah, it will take some time and we've got, we've got, we've got... 918 02:15:00,000 --> 02:15:02,780 The direction here, and we can begin that process. 919 02:15:03,660 --> 02:15:08,960 Would you be, when you get a chance, I know the holidays are coming up, would you get some more information 920 02:15:08,960 --> 02:15:14,080 to answer council members, votes, question, and just distributed to council members? 921 02:15:14,100 --> 02:15:15,200 Yes, happy to do that. 922 02:15:15,380 --> 02:15:15,640 Is that work? 923 02:15:16,760 --> 02:15:18,120 Council is anything further? 924 02:15:19,760 --> 02:15:19,960 Okay. 925 02:15:20,540 --> 02:15:22,300 That wraps up 2.4. 926 02:15:23,420 --> 02:15:28,800 The next item, 2.5 authorized, change order number one for well-setting study, phase two, 927 02:15:32,460 --> 02:15:37,420 And apparently I've developed a cough again, which seems to happen when I have to talk a lot. 928 02:15:38,240 --> 02:15:41,200 Okay, so we are still in the same area of town. 929 02:15:41,360 --> 02:15:44,820 We're talking about our well-sighted studies. 930 02:15:45,460 --> 02:15:48,260 So the Council had a detailed workshop on October 14, 931 02:15:49,100 --> 02:15:50,800 where consultant reviewed it. 932 02:15:50,800 --> 02:16:00,300 to really provide it a background refresher on the potential water supply within our south 933 02:16:00,300 --> 02:16:05,240 growth area, as well as our initial findings associated with the well-siting study. 934 02:16:06,100 --> 02:16:20,780 So just to recap, Trout has completed four well-borns to date at locations, I'll show you 935 02:16:20,780 --> 02:16:26,500 We would have the potential to supply 500 to 700 GPM of water from a screen well in the 936 02:16:26,500 --> 02:16:31,440 Jordan Aquifer in those areas, but really what we're after is 1200 GPM. 937 02:16:32,480 --> 02:16:38,540 So, our South Korea, we want to have 4 1200 GPM wells that serve our South Korea, there's 938 02:16:38,540 --> 02:16:40,740 an additional treatment plant in that area. 939 02:16:41,320 --> 02:16:46,860 For only getting 500 GPM out of a well, we're going to need twice as many wells. 940 02:16:46,860 --> 02:16:51,040 and there's costs associated with the construction of the wells, the maintenance of the wells, 941 02:16:51,600 --> 02:16:56,500 and the connection of those water supplies. So that certainly isn't ideal. 942 02:16:59,220 --> 02:17:03,100 However, as was started to be indicated at that meeting, 943 02:17:03,580 --> 02:17:09,600 bar did take a look at the information that we have available in is recommending that we pursue 944 02:17:09,600 --> 02:17:15,740 one additional boring in the location shown here is number six in this general location. 945 02:17:16,220 --> 02:17:21,140 The other boarings were completed. These blue dots on the gash stock and welter properties. 946 02:17:21,540 --> 02:17:26,620 So they're based on what they found there. They're requesting that we do one more boring. 947 02:17:27,140 --> 02:17:30,320 Real quick. I'm sorry. Number two was never grilled. 948 02:17:30,520 --> 02:17:37,080 Correct. Because the findings of three were unfavorable. They directed us to go north instead of south. 949 02:17:37,080 --> 02:17:40,440 So free was removed and five was added. 950 02:17:41,020 --> 02:17:44,580 So originally we were doing one, two, three, four. 951 02:17:44,780 --> 02:17:48,740 But after we did one and three, they said don't do two. 952 02:17:48,860 --> 02:17:51,200 We added five, so we just swapped two for five. 953 02:17:51,300 --> 02:17:53,580 But now they want us to add a fifth location, 954 02:17:53,900 --> 02:17:58,020 which is location number six, even though it's the fifth location. 955 02:17:58,720 --> 02:18:03,140 Let's just, I know I ended up, that's okay. 956 02:18:03,280 --> 02:18:10,340 up to you. Let's say number six finds enough flow. Then we'd have to pipe all of the water down 957 02:18:10,340 --> 02:18:17,700 throughout the southern part of the city. Yeah, so what we're hoping to find with location number six 958 02:18:17,700 --> 02:18:24,360 is something better than number five, so we could proceed with well number five to accommodate development. 959 02:18:25,040 --> 02:18:29,960 It still doesn't answer our question of how we really want to take a look at providing water 960 02:18:29,960 --> 02:18:31,720 for the entire self-growth area. 961 02:18:32,560 --> 02:18:34,500 So simultaneously to that work, 962 02:18:34,900 --> 02:18:38,400 we have initiated conversations with Chaska and Carver 963 02:18:38,400 --> 02:18:43,320 to gain information about what they're doing outside of our city 964 02:18:43,320 --> 02:18:47,500 limits to see, if they're not having supply issues, 965 02:18:47,900 --> 02:18:50,560 should we be pursuing purchasing water from them, 966 02:18:50,660 --> 02:18:52,300 doing some sort of joint project? 967 02:18:53,000 --> 02:18:55,040 We're in the early stages of those discussions. 968 02:18:55,320 --> 02:18:58,580 They're providing me with their water supply plan information, 969 02:18:58,580 --> 02:19:02,480 so we can take a look at their system relative to our needs. 970 02:19:03,300 --> 02:19:06,700 The other thing that I just wanted to note to the church, 971 02:19:07,900 --> 02:19:11,880 the Westbrook community church is located at the intersection of 10 and 11, 972 02:19:12,740 --> 02:19:15,060 and that's going to be constructed at that intersection, 973 02:19:15,220 --> 02:19:18,240 and they need to provide sprinkler protection. 974 02:19:18,500 --> 02:19:20,960 So they need some pretty significant water supply. 975 02:19:21,920 --> 02:19:25,380 So we also, I had a conversation with the pastor on Friday, 976 02:19:25,480 --> 02:19:28,140 and then we'll be circling back to bar to see if we want 977 02:19:29,460 --> 02:19:34,460 combined efforts in any sort of way. It might be as simple as we get an opportunity 978 02:19:34,460 --> 02:19:39,040 to observe their well when they do the boring to find out if there's additional 979 02:19:39,040 --> 02:19:43,700 information there or you know bar may say yeah we should investigate that even 980 02:19:43,700 --> 02:19:48,760 further. But so on the big picture front we are going to continue to do work but 981 02:19:48,760 --> 02:19:52,840 meanwhile we do have development pressure in this area that we you know by the 982 02:19:52,840 --> 02:19:56,300 time we get a couple hundred homes online we are going to need additional water 983 02:19:56,300 --> 02:19:59,540 supply, so we do want to continue to move forward. 984 02:20:00,000 --> 02:20:08,800 If six doesn't produce a better result than five, then I suspect we'll be looking at five for the location of well number five. 985 02:20:09,480 --> 02:20:18,720 And those wells take a little bit of time to construct and get online. So we do want to keep moving forward in order to be able to provide more answers to the developers. 986 02:20:19,380 --> 02:20:21,560 Right. So tonight you're asking us to approve six. 987 02:20:21,700 --> 02:20:29,520 Correct. So what that would be would be, and I actually need to go back to the packet because I didn't word it correctly in my slide. 988 02:20:29,520 --> 02:20:32,600 but approving change order number one, 989 02:20:33,040 --> 02:20:36,960 thereby increasing the contract amount by 49,925 990 02:20:36,960 --> 02:20:40,080 and extending the project completion date to May 16th. 991 02:20:41,760 --> 02:20:45,280 And the weld drill will get us on their schedule, 992 02:20:45,960 --> 02:20:47,860 but we wanted to make sure we had enough time 993 02:20:47,860 --> 02:20:50,260 in the change order to, so we're completed. 994 02:20:50,340 --> 02:20:53,260 So that 49,000, almost 50,000 dollars this 995 02:20:53,260 --> 02:20:54,560 for one more boring, correct? 996 02:20:55,720 --> 02:20:55,840 Yes. 997 02:20:55,840 --> 02:20:58,400 How much water did you say number five could produce? 998 02:20:58,400 --> 02:21:03,120 I believe that was in that five to seven hundred range. 999 02:21:03,740 --> 02:21:08,120 So we're going to need another well quicker than we would have had we found. 1000 02:21:09,660 --> 02:21:10,440 The higher volume. 1001 02:21:11,640 --> 02:21:17,500 We'll pretty quickly need to be continuing to look at our comprehensive water plan and what those triggers are. 1002 02:21:17,920 --> 02:21:25,800 And we've been operating under an assumption of 4, 1200 GPM wells spaced out over a number of years. 1003 02:21:25,800 --> 02:21:30,060 You know, this information is going to cause us to need to re-look at. 1004 02:21:30,060 --> 02:21:33,500 Oh, 2.5, we had the money to be in cash. 1005 02:21:34,660 --> 02:21:36,300 Well, number 5, we're going to have to borrow. 1006 02:21:39,050 --> 02:21:43,010 It was a combination for the $4 million dollar ad. 1007 02:21:43,030 --> 02:21:44,670 We're going to have to borrow for sure. 1008 02:21:45,590 --> 02:21:50,410 Yeah, I mean, we'll want to, so as part of the rate study, that sign going, we'll take a look at, 1009 02:21:50,410 --> 02:21:52,430 we'll have, you know, updated information. 1010 02:21:52,770 --> 02:21:57,510 We'll take a look at the projection of timing of wells in the future water treatment plant. 1011 02:21:57,510 --> 02:22:00,050 And that analysis will roll into the right study 1012 02:22:00,050 --> 02:22:02,770 to determine what corfies, 1013 02:22:04,930 --> 02:22:06,090 water availability charges 1014 02:22:06,090 --> 02:22:09,190 and rates should be to accommodate that future demand. 1015 02:22:11,610 --> 02:22:14,350 So the timing, it's good that we're 1016 02:22:14,350 --> 02:22:16,770 learning this information in conjunction with doing 1017 02:22:16,770 --> 02:22:17,590 the right study. 1018 02:22:20,130 --> 02:22:22,450 All right, council, was that it here? 1019 02:22:22,530 --> 02:22:22,790 Yes. 1020 02:22:23,030 --> 02:22:23,830 Council questions? 1021 02:22:24,950 --> 02:22:25,350 Discussion? 1022 02:22:28,230 --> 02:22:31,030 Are they going to look at the church property? 1023 02:22:31,030 --> 02:22:40,210 Yes, so separately from this change order authorization without for well-journaly we'll continue to work with bar on these other questions and I will be sending them 1024 02:22:41,030 --> 02:22:47,430 A graphic showing where that property is and bringing them up to speed on what opportunity might be there. 1025 02:22:47,450 --> 02:22:52,190 So I spoke with the church on Friday and need to relay that information to bar yet. 1026 02:22:52,230 --> 02:22:53,210 Was he open to that? 1027 02:22:53,410 --> 02:22:55,990 Yes, he called me after being at the south 1028 02:22:55,990 --> 02:23:03,710 the Victoria Works Open House. He chatted with some sub set of you and called me. 1029 02:23:03,970 --> 02:23:05,770 Okay great. Yeah. It was helpful. 1030 02:23:05,770 --> 02:23:07,390 It was close to water over there. 1031 02:23:08,470 --> 02:23:11,150 All right. I will make a motion to approve change order number one. 1032 02:23:11,310 --> 02:23:15,050 Thereby increasing the contract amount to 49,925 bucks. 1033 02:23:15,830 --> 02:23:19,550 And extending the project completion date to May 16, 2020. 1034 02:23:20,190 --> 02:23:21,250 Thank you, second please. 1035 02:23:22,230 --> 02:23:23,210 Any further discussion? 1036 02:23:23,210 --> 02:23:28,610 Hearing none, all in favor, signify by saying aye, aye, all opposed? Motion carries unanimously. 1037 02:23:29,950 --> 02:23:30,590 Okay, that wraps. 1038 02:23:32,010 --> 02:23:32,230 Hmm? 1039 02:23:32,230 --> 02:23:34,070 I think you got a line, but you locked out. 1040 02:23:34,590 --> 02:23:36,070 Or you're still lying the door low. 1041 02:23:37,650 --> 02:23:38,450 Must have self locked. 1042 02:23:43,320 --> 02:23:46,960 Okay, that completes the special media agenda. 1043 02:23:47,120 --> 02:23:48,880 There's one last two last items. 1044 02:23:49,640 --> 02:23:50,560 Roundtable real quick. 1045 02:23:51,420 --> 02:23:55,560 I want to find out if the council has any objections to adding to our 1046 02:23:56,480 --> 02:24:11,560 Legislative agenda letter to legislators on changing the open meeting law based on what our city has experienced before and the Supreme Court case I think there's changes to be made to that. 1047 02:24:12,960 --> 02:24:16,940 And without objection from the council I'd like to draft up some of those suggested changes. 1048 02:24:16,940 --> 02:24:22,460 to get them drafted in a letter by Dana, and then allow each of you to see those changes. 1049 02:24:23,600 --> 02:24:27,320 And then we can bring this back at another time to talk about it, but I'd like to get 1050 02:24:27,320 --> 02:24:34,440 a draft letter, at least a letter drafted rather, for the council to consider as far as 1051 02:24:34,440 --> 02:24:35,240 potential changes. 1052 02:24:36,480 --> 02:24:42,060 Question, do we have others who are joining in with us on this legislation? 1053 02:24:42,060 --> 02:24:48,380 is this going to be part of our legislative agenda from the League of Ministers' cities? 1054 02:24:49,380 --> 02:24:56,160 We had three items, correct, Dana, that the council approved in the last meeting, 1055 02:24:56,440 --> 02:24:57,660 as far as legislative priorities. 1056 02:24:58,760 --> 02:24:59,960 Right, this would be a fourth one. 1057 02:25:00,000 --> 02:25:06,940 For our city. So there's not other cities that I'm asking us to join with on asking this city to add that item to our list. 1058 02:25:07,780 --> 02:25:17,020 But I don't want you to add it blindly. I want to have Dana draft a letter that each of you can look at and then we can bring it up for discussion at a later time. 1059 02:25:17,280 --> 02:25:26,520 I like to see what would be on the letter because I know one of that is Mr. Mayor that you were discussing with the lead is something I disagree with. 1060 02:25:26,520 --> 02:25:27,500 So that's fine. 1061 02:25:27,600 --> 02:25:31,440 That's why I want to, so you have something that you can look at, instead of just arbitrarily 1062 02:25:31,440 --> 02:25:33,900 you're going to need something without, right, right? 1063 02:25:34,120 --> 02:25:35,240 So without objection? 1064 02:25:35,840 --> 02:25:36,260 No objection. 1065 02:25:37,140 --> 02:25:37,200 No objection. 1066 02:25:37,200 --> 02:25:41,940 All right, Dana, I'll work with you and draft something that we can then bring back to 1067 02:25:41,940 --> 02:25:44,040 the council for them to take a look at. 1068 02:25:44,260 --> 02:25:46,240 All right, there's nothing else. 1069 02:25:46,520 --> 02:25:48,820 So there's no reports on a special meeting like this. 1070 02:25:49,100 --> 02:25:52,180 So at this point, I ask for a motion for adjournment, please. 1071 02:25:53,060 --> 02:25:53,940 Motion to adjourn. 1072 02:25:54,440 --> 02:25:55,000 Second, please. 1073 02:25:55,460 --> 02:25:55,720 Okay. 1074 02:25:55,720 --> 02:25:59,780 Any discussion here in none on favor signify by say night. 1075 02:26:00,020 --> 02:26:00,160 Hi. 1076 02:26:00,920 --> 02:26:01,800 We are adjourned. Thank you. 1077 02:26:02,420 --> 02:26:02,940 Merry Christmas. 1078 02:26:03,540 --> 02:26:03,820 Wow.