[0:02] Okay. Uh welcome everybody. This is uh [0:06] the City of Vineland Chestnut Avenue Safety Improvements and Rehabilitation [0:11] Project in the City of Vineland, Cumberland County, New Jersey. [0:15] Repre- Representatives include Brian Headley, the city engineer, Stephanie [0:19] Weakley, the assistant engineer. Um [0:23] Beth Grasso, that's myself from Pennoni, we're the we're the designer lead. [0:28] Charles Comer Ca- Calimer? [0:32] Sorry. Uh he's from GPI. Uh we he is also one of the designers uh on [0:38] the project and we have put this project together but as a shared project between [0:43] Pennoni and GPI. And uh we have I'm not sure if Carol's [0:48] there, but um from Envisions um she has uh been leading the public [0:54] involvement portion of the project. So, [0:58] um [1:01] I'd like to introduce our Spanish interpreter. [1:33] Are we good? >> Yeah. [1:34] » Good. Okay. So, [1:37] the project is funded with a 20% city match to uh through the following [1:42] sources. Uh the city received a $20 million grant [1:45] through the Safe Streets for All the SS4A program [1:49] uh from the Federal Highway Administration and $2 million in federal [1:54] community project funding. This is the second PIC meeting, public [1:59] information center meeting. Since the first meeting [2:03] back in September, it was September 11th of 2025, the scope of the project was [2:09] changed based on Federal Highway guidance. [2:14] So, we're going to talk about some of those changes. [2:19] Uh Pennoni Associates is a primary engineering consultant and partnering [2:22] with with Green and Peterson Peterson uh GPI. [2:27] The following process is typically applied for our transportation [2:30] improvement projects. First, we evaluate the corridor. We come [2:35] up with a plan. We create the design, and then the [2:38] project goes to construction. Right now, we're in the design phase. [2:45] Okay. So, some of the things we'll discuss is [2:49] the project location, the existing conditions, the purpose and need for the [2:53] project, the proposed improvements, the project benefits, the next steps, and we [2:59] will have a Q&A session at the end. Please hold your questions to the very [3:03] end. We will answer everybody's question, [3:06] uh but it's just uh more organized if we answer the questions at the end and just [3:11] continue going through the slideshow. So, the project location is Chestnut [3:17] Avenue between Delsea Drive Route 47 and Main Road, that's CR 555. [3:22] It's about 2 and 1/4 mi in length. [3:27] The existing roadway is a four-lane multi-lane highway with two lanes in [3:31] each direction. Traffic signals are outdated with obsolete timings and [3:35] non-functional or limited vehicle detection. [3:39] There's uh damage to sidewalk and ADA facilities, [3:43] uh limited roadway and pedestrian lighting, and stormwater infrastructure [3:48] needs replacements or and or upgrades. [3:54] Besides the condition of the pavement. Um the asphalt pavement and striping is [4:00] in overall poor condition. The traffic signal equipment is outdated [4:05] and timings are obsolete for current traffic volumes. [4:08] Uh missing and damaged sidewalk limit limits ADA uh roadway users. [4:14] Uh safety concerns are paramount with the crash history showing significant [4:18] numbers of crashes, crashes with injuries and fatalities. [4:22] The uh proposed stormwater improvements will [4:25] help mitigate flooding around along Chestnut Avenue. [4:31] So, the proposed improvement, we're going to uh this is uh different than uh [4:37] what we had presented back in um September, which was at that time a road [4:42] diet, which was going to be one lane each direction with a center lane to [4:46] make turns. That has since been changed to convert [4:50] the four-lane multi-lane highway into a four-lane thoroughfare [4:54] with 12-ft wide dedicated left turn lanes at the signalized intersections. [5:00] So, we're still going to upgrade the traffic signals within in the corridor, [5:04] and use uh new traffic uh signal will be installed at South 3rd Street. [5:09] We're going to install 5-ft wide sidewalk and an 8-ft wide shared use [5:13] path on the eastbound and westbound sides of the roadway, respectively. [5:18] It We're going to install ADA compliant curb ramps, install upgrading lighting [5:22] facilities for vehicles and pedestrians, and we're going to do those drainage [5:26] infrastructures updates. I want to uh point to the photo or the this the [5:31] um figure on the right-hand side proposed roadway layout. I'm sure [5:35] everybody's familiar with when you have two lanes and you put in a center lane [5:39] uh to to make that dedicated left turn, you know, it'll give you a protected um [5:45] left turn and improve safety. Okay. [5:51] So, this is kind of a weird push out picture, but uh, when you go [5:56] from four lanes to five lanes, at the intersection you're going to have to [6:00] push out. So, you're going to uh, convert the existing four lane [6:05] between Southeast Boulevard and 7th Street into a four lane thoroughfare [6:08] with a center uh, two two-way left turn lane. [6:13] Uh, we're going to install mid-block crossings with rectangular rapid [6:16] flashing beacons at several locations. Um, [6:21] so, this is kind of representing what what you would see [6:25] um, the widening. You've gone from the four [6:29] lanes out to five lanes, and then you go from the five lanes back to four lanes. [6:37] So, dedicated left turn lanes are anticipated to reduce the rear end and [6:41] left turn crashes and act as an overall traffic traffic calming mechanism. [6:47] New shared use paths will separate vehicular traffic from bicycles and [6:51] pedestrians. Optimized traffic signals are expected [6:55] to enhance the travel time through the corridor. [6:58] Currently, people race through the corridor trying to get to the next light [7:02] without getting caught by the light. This timing will be [7:06] better, so there'll be a smoother flow and there's no real reason to race down [7:10] the street to try to hit the next light. [7:15] So, the next steps, we are proceeding with the final design plans. We just [7:19] submitted our 60% plans. We're going to develop our construction [7:23] cost estimates and bid the project to perfect [7:27] prospective contractors. We're going to enter construction with [7:31] an anticipated completion in fall of 2027. [7:36] Stephanie, I believe that is pushed back a little bit. [7:41] » Yeah, we're looking to start construction in June [7:45] of next year. >> Okay. [7:48] » It's upcoming here. >> So, it's not completion. It's [7:52] construction is anticipated in fall of 20 or June of 2027. [7:56] » prior to fall, yeah. >> Yeah. Okay. [8:01] All right. And then, uh just to let everybody know this [8:06] meeting's been recorded and be available for replay on the City of Violence [8:09] website under the project uh web page. There's the web page. It's [8:15] really easy to find um on uh Violence web page. [8:20] Uh public comments will be accepted for period of 30 days through August 20th of [8:26] 2026. Uh kindly for- forward all your uh [8:30] comments to Stephanie Weakley at sweakley@bylasay.org [8:36] and there's her phone number. So, um if there's any questions, we'd [8:41] like to address those. [8:44] I'll leave this up on the screen if if anybody's writing it down. [8:47] » Would anyone Does anyone have any any questions or comments that you'd like to [8:52] share? Please raise your hand. [8:56] Oh, um Yeah, uh if anyone has any questions or [9:02] any anything you'd like to share, please do so now. Please raise your hand. I [9:06] think you raised your hand first, so you might sit down. And can you state your [9:10] name and your address, please? >> My name is uh Mr. Herrera. [9:14] I'm from 105 West Cherry. That's actually in between the Boulevard and [9:19] Horse Street at that main intersection where all this community transit comes. [9:24] Um in the past, there's been a lot of accidents there, a lot. Uh there's been [9:29] a lot of deaths. And I've actually lost my neighbor on [9:32] Chester Avenue uh November 15th, 1989, right there [9:37] where the hospital is. Um this is I I feel it's going to be [9:41] something uh a lot better for us to have here because there is a lot going on on [9:47] Chestnut Avenue. Um everyone is racing to get to a traffic light for no [9:52] apparent reason of life other than for their own sanity, I guess. [9:57] Uh this is going to help a lot. I do believe it's going to improve a lot [10:00] what's going on, especially the drainage. [10:02] There is a lot of flooding on Chestnut Avenue that the area of 6th Street is [10:06] the worst spot of all. So I would say that I think this is a [10:09] good plan to move forward with. Um my question really is is there [10:13] already a engineering drawing laid out uh by model or anything? [10:18] Of the area at all? >> Like plans? [10:21] » Yes, the actual way actual way to see it now. [10:25] » Uh >> On the road with or anything like that? [10:27] » Just more of like a a design plan that's on the website. [10:31] Yeah. [10:35] » Remember the link that goes with the document you were [10:38] » Um I'll look into that. >> Thank you. Thank you for your comment. [10:43] Um I Did you have your hand raised? Oh, you [10:45] did. >> Yes, first here. [10:47] » And state your name and address. >> My name is John Basilie. [10:51] I was the city engineer for the city that did most of this work that is [10:56] involved in this project. So I have just a couple of questions. Is [11:00] there going to be any widening of the Chestnut Avenue? [11:05] » Beth, did you hear the question? >> Something about widening. [11:09] » Yeah, is the is the roadway going to get widened? [11:13] » It'll be uh only in the areas uh where we're [11:17] widening for left turn lanes. >> I mean like at an intersection [11:21] primarily. >> intersection, yes. [11:22] » The main width of the road is pretty much going to stay the way it is. [11:26] » Yes. >> Well, it's going to be [11:28] Yeah, it's going to be widened at the intersections because we're creating a [11:31] dedicated left turn >> Right. Correct. [11:33] » So it's lighting for that. >> Right. [11:36] And um the reference to shared pathways [11:41] between pedestrians and bicycles like you know, that's not clear to me. Does [11:46] that mean that the sidewalk is now going to be used [11:50] and no bicycles will be in in the roadway? What does that mean, a shared [11:55] pathway? >> You want to take that, Stephanie? [11:59] » I mean That's a good thing but that's what it [12:02] is. >> Yeah, we'll have a separate multi-use [12:06] path that is separate from the roadway which [12:09] will accommodate both pedestrians and bicycles. It'll be 8 ft wide and it'll [12:13] be located typically on the west side of the roadway. [12:18] The east side of the roadway will have a 5-ft wide sidewalk instead of the 4-ft [12:24] that's out there. >> North side of the roadway. It'll be on [12:26] the north side. >> All right, so [12:28] » Sorry, north and south. Yeah, you're right. [12:30] » There won't There won't be a bicycle path [12:32] » There's no bicycle Yeah, there's no bicycle lane in the roadway. The idea of [12:36] the shared use path is so that the the bicycles are out of the travelway for [12:42] » That's good. >> for safety purposes. [12:44] » One of the early ideas was having a bicycle path possibly mixing with [12:49] traffic so I just want to make sure >> outside the curb line to [12:53] » Yeah, that's good. >> prevent the uh [12:55] » I didn't hear anything about the intersection of Valley and Chestnut cuz [13:00] once upon a time there was I guess a design idea of putting some [13:05] kind of a circle or turnaround in there. I know [13:09] it's >> A roundabout is not included. Right. A [13:14] roundabout is not included. >> So no, there's um [13:18] we we did look at that in the original concepts of the uh unfortunately we just [13:22] don't have the right of way there to put a roundabout. Uh I believe it's just [13:26] going to be handled through traffic signal timing improvements primarily to [13:30] make that >> Right. [13:31] » a little more efficient. >> So, the main thing that I'm getting from [13:34] this presentation, and and this is very important, and [13:39] that's that Chestnut Avenue will primarily still be four lanes wide all [13:44] the way because that's why we made it four lanes wide. When I started, it was [13:50] two lanes wide and at rush hour, you it was terrible. [13:56] You couldn't get you couldn't get in and out because [13:59] the volume of traffic, you can imagine what it was [14:03] 25 years ago when I did it. Today, it's even more. [14:07] So, and and with the fire station there, you know, you can't have a traffic [14:13] problem and have a fire station in the same area. [14:17] » Yeah, we >> That's a very good it's a very good [14:20] amendment that you made. >> Yeah, we we we did switch back to the [14:24] four or two in each direction as as well as additional protected left turn lanes [14:28] at the lights. Uh and then we have added other pedestrian and bicycle safety [14:34] improvements in the hope that these crashes that have happened uh between [14:40] pedestrians and also just the motor vehicles general are reduced as part of [14:44] this project. >> And and obviously in the very beginning, [14:48] uh there's no doubt that Chestnut Avenue needs a complete rehab. I think the last [14:53] time it had new asphalt was '96. So, if you do the math, [14:57] 30 years, that's way past the expectancy on a road of this [15:03] level of volume of traffic. And of course, school buses use it quite a bit [15:07] as well. So, uh [15:13] Are you to the point of designing the thickness of the asphalt or how that [15:19] final installation is going to be or you still in the design part of just doing [15:25] geometry? >> Beth, you can correct me if I'm wrong, [15:28] but we're we're at the end of prelim we're [15:31] » You know, I can hardly hear you because I'm echoing in the stream. [15:34] » preliminary engineering design. So, we do have thicknesses proposed areas in [15:39] some areas Chestnut does have a concrete base [15:42] » Yeah. >> that we're working with [15:44] either removing or replacing, but we are at that point where we do have [15:49] thickness. I don't have it off hand. >> That's okay. I'm just wondering whether [15:52] you already got to that point. >> Yeah, we are we are there. [15:54] » All right. All right, good. >> And we did some [15:57] we did do some coring samples and things like that to test the sub base and [16:01] obviously during construction if we have to make [16:04] minor changes we will. >> Yeah, you you shouldn't have find any [16:08] surprises in Chestnut Avenue. We found them all. [16:12] » [laughter] >> Saved us some time. [16:15] » Huh? >> Saved us some time. [16:16] » Yeah, well, we widened it when when we went from two lanes to four lanes, [16:20] you're going to find a lot of stuff. So, we moved most of the utilities that [16:24] could have been moved. Especially between the railroad and Delcy. [16:29] Cuz that that was very narrow. So, the gas line and everything [16:33] has been moved, but still there's you might you never know what [16:38] you might find, but we took care of most of it I think back then. [16:42] All right, very good. Well, I'm happy. I mean, it's a big change from the [16:47] beginning when this project first made the news, you know, with two lanes [16:52] and bicycles. I got a lot of phone calls about you got to stop it. [16:57] So, someone came to their senses. >> Well, thank you for being here [17:01] especially with your your history. Thank you. [17:05] Yes. Yes. >> I wasn't sure where we're going to be so [17:10] whether we were at two lanes or four lanes or or especially with the bicycles [17:15] cuz I wouldn't want anyone to ride a bike down Chestnut Avenue. That would be [17:20] very dangerous, I would consider. >> So, it's good that we're separating [17:23] we're separating them. >> satisfied with with what I've just seen. [17:29] » Thank you. >> Uh I would say 2027 is an ambitious [17:33] date, but go for it. >> Thank you. Thank you. [17:39] Does anyone else have any public comment? Okay, please state your name [17:42] and your address, please. >> Michael Stern, Princess Lane, Vineland. [17:48] Uh two questions. One, will the speed limit change [17:52] with the uh improvements? And the second thing is [17:56] there is a uh an approval for a uh self-storage [18:01] facility on uh Chestnut Avenue. Uh is there going [18:07] to be some uh [18:09] accommodation for a D-cell lane, or you don't think you need one [18:14] with that particular project? >> Uh for for the first portion, the speed [18:19] limit will not be changing as I don't believe so. [18:23] » The speed limit is not changing as part of the project. For the second question, [18:26] the self-storage facility is is uh towards the east side of the project, [18:31] towards Main Road. Um it does have approval. We're not sure [18:35] of the timing. Uh it [18:38] They did not propose a D-cell lane. I don't believe it would be required. [18:41] Typically, self-storage after construction has a relatively low [18:44] traffic count uh because people are visiting at maybe once a week to the to [18:49] their storage unit. Uh so, we're not proposing any sort of D-cell lane for [18:52] actually any of the uses along Chestnut Avenue. [18:56] » Thank you very much. [19:01] » Okay, yes. Um please state your name and your address, thank you. [19:04] » Yeah. [19:07] Lisa Fleming, 2100 Marsh River Parkway. Um in Vineland. [19:12] And I was just wondering uh how far are the sidewalks and the the sidewalk and [19:19] the multi-use [19:21] path, how far will they be from the curb? [19:25] And will they be like it probably is going to vary as you go [19:28] along the road, but will be mostly taking room from [19:34] the space between the sidewalk and the curb or cutting more towards people's [19:39] properties? >> So, generally [19:42] uh it will be cutting further away from the roadway [19:48] with so that there's a vegetated strip between the curbing and [19:53] the path um that separation is important for us. [19:58] Uh Chestnut has a 100-ft right-of-way, so I will say there is a lot of [20:05] private improvements that have creeped their way into the public right-of-way, [20:09] uh but what we're doing is we're obviously doing our best to weigh those, [20:12] but it will have a it varies obviously the distance, but it's not going to be [20:16] right up against the curb like you see sometimes. That's not something we're [20:19] looking to do here. >> That's good. Thanks. [20:24] Would anyone else like to Oh, yes, thank you. Please state your name and address. [20:29] » I'm Deb Marco, 728 Yale Terrace. Most of the crashes on Chestnut Avenue have been [20:34] pedestrian-related. Could you explain a little bit more how people are crossing [20:37] Chestnut Avenue, particularly like at Valley and Main Road where the school [20:41] is? [20:43] » Sure. Um [20:46] Do you want me to Beth, do you want to handle that one? That's a little more in [20:49] the details than than I know about. Did you hear the question? [20:53] » Yeah. We're adding uh the bus the pedestrian paths [20:59] uh will keep more kids on the sidewalk rather than out in the roadway. [21:04] Um especially if they're riding bicycles, and all the crossings will be [21:09] very well marked. We'll have um, push buttons. [21:14] So that the children can can go across when the push button shows [21:18] them the symbol to walk. Um, and you know, uh, [21:23] we're updating all the signals accordingly. [21:28] » We're doing lighting improvements as well. [21:30] » Yeah. >> Uh, and we have we have reached out [21:34] to the crossing guards as well. So they are [21:37] they are along that path for a lot of the walkers from the school and taking [21:41] their concerns into consideration as well. [21:44] » And we're going to have several rapid flashing beacons. [21:48] » There are but there's no bump out proposed at the intersection. [21:52] Um, it's not wide enough for the bump outs, right Beth? [21:56] » Correct. >> So, um, there's no bump out proposed but [22:00] we do have the certain areas that have flashing beacons. [22:04] And then in general all of the light the traffic signals will be upgraded [22:09] so that they are better advertising when a pedestrian should cross. [22:16] Um, they provide the, you know, the flashing beacons, the walk, don't walk, [22:21] the countdowns. And then additionally [22:24] just general visibility will be improved through striping. [22:28] And then better realignment for certain crosswalks so that it would be more [22:33] conducive to somebody using that. Cuz the big issue I think we run into a lot [22:38] um, with pedestrian crashes, pedestrian vehicle crashes, is getting the [22:43] pedestrian to utilize the crosswalk. Sometimes I know we had this issue on [22:47] Landis Avenue where if if they want to cross [22:51] in the middle of the roadway and there's not a crosswalk it's difficult to design [22:55] for that obviously cuz we can't anticipate that and we obviously can't [22:58] have the whole thing be pedestrian crosswalk. So what we try to do is we [23:02] try to improve the crossings that exist to [23:06] uh make them more I'll say user-friendly for the individual, more inclined to to [23:11] utilize those crosswalks to give them uh the safest path from either the north [23:16] side to the south side or or or east-west along Chestnut Hill. [23:21] » Um as Anatole mentioned, there's a lot of aging infrastructure in Violand. Has [23:25] everything been improved in that Chestnut area of Carrigower? Cuz most of [23:29] the time we have >> paving projects and a year later they're [23:31] digging it up because we have a water main break or something like that. [23:34] » We have been working uh very hard in general across the city to make sure [23:40] that uh we are following the water main and sewer and gas uh with our paving [23:46] projects, but yes, for this one specifically, uh we have coordinated [23:49] with water utility, um South Jersey Gas. You might have seen [23:53] them out there. They're They've been doing improvements down the way uh for [23:56] quite some time. Uh same thing with the Landis Sewerage Authority. Uh they're [24:00] aware and they're in the process of uh TVing all their pipes to make sure their [24:05] services are updated. So, yeah, we're doing our best to prevent that. [24:11] » We also also videoed uh storm sewer, too. [24:16] » I know you had another remark. >> Okay, Lisa Fleming again. Um [24:22] question about the crosswalks. Actually, two. [24:26] Is it is there any thought to having the [24:30] timing of the pedestrian crossings be like total all [24:36] the way around like >> Like a separate like a third phase where [24:40] it's just pedestrians crossing? >> Yes. [24:42] » Um we actually ironically, we spoke about that today. [24:45] Uh as of right now, we don't have a separate uh pedestrian phase. Uh it's [24:51] definitely something that we could see if it's warranted based on our [24:55] pedestrian counts, but right now it's just the uh standard kind of [24:59] uh you know, you're going to where the [25:01] traffic's going in your car. >> Right. It It just might be good at the [25:04] major intersections like at Main Road and at um East. [25:10] » Yeah. Yeah, we're working on that balance, obviously, um for private. So, [25:14] it's definitely something we can uh continue to consider as we finalize our [25:18] design. >> And will there be any other crossings in [25:23] between the intersections? >> As of right now, we don't have any [25:27] mid-block crossings. Uh for a road like Chestnut, uh we we felt that to to do [25:32] that would be um would be fairly [clears throat] [25:37] dangerous for a pedestrian. >> Inviting problems. [25:39] » It does cuz obviously it's four lanes of traffic and um [25:44] any mid-block crossing, even the one with the best signage, uh is sometimes [25:48] unexpected for a pedestrian. So, I know if you drive down Landis, sometimes you [25:51] don't expect them and it's a whole different It's a whole different uh [25:54] service. So, we we thought that there were We felt there were enough crossings [25:59] that uh it would be adequate to have them cross uh particularly at [26:02] intersections and primarily at signalized intersections. [26:06] » Okay. Thank you. Um yes, you have a question [26:10] or a comment. >> Hi. My My name's Mike Di Stefano. Uh [26:15] Rocque Funeral Service here in Vineland, 1110 Chestnut Avenue. We take up a lot [26:19] of frontage between Valley and Evelyn on there. [26:22] Uh I know I'm a little late. I tried to get on Zoom. I couldn't get on. But, [26:26] I'm interested to know where the existing sidewalk is [26:30] on Chestnut going in front of our building. Is that going to be moved or [26:34] are you encroaching that far back or >> Uh [26:39] Do you have an existing sidewalk in front of your [26:41] » In front of the funeral home. >> Yes. [26:42] » All the way down. [26:46] Mhm. >> Uh [26:48] and you would know better. I It's out up [26:50] against the curb, right? There's this strip. [26:52] » There's a grass strip, you know. >> Uh that will be on the north side that [26:56] will be revised to an 8-ft wide shared use path. [27:00] » Okay. >> It'll be wider, so it will be moving [27:03] inward. Still on city property, obviously city [27:06] property, but inward towards towards your building. [27:09] » Right. So, I don't know if you've ever been by, but we have four large concrete [27:14] pilasters with lanterns and the entrance and exit are up our driveway. [27:18] They We always thought it was our property, you know, back that far from [27:21] the center of the road. But, what happens to those? [27:25] » Well, we we've done our best if need be to kind of jog [27:30] uh that sidewalk to avoid any uh moving any larger structures or things [27:36] that we wouldn't really >> Yeah, cuz I just had these put in not [27:39] long I mean, we've been there since 1955, but I had them redone about 6 [27:44] years ago, I guess, and I made them all concrete. [27:48] » We we [27:50] » Okay. All right. That's a good thing. My other question is the traffic light at [27:55] Valley Avenue. You know, Valley's offset. That's where a lot of accidents [28:00] occur. Um when we pull out taking leave on a [28:04] funeral and we're leaving the east-west [28:08] side of Chestnut Avenue, that light we timed it's about 19 seconds before it [28:13] changes. Are they Are they going to be elongated [28:16] or anything to give more time for that? [28:20] » What we've done is uh we're doing a full reevaluation of the [28:23] signal and the signal timing and obviously the signal itself is being [28:27] replaced. >> Right. [28:28] » and updated. Uh so, based on our traffic counts, obviously we can't always [28:34] account for something like a funeral >> Yeah, I understand they were fixed not [28:37] long ago. They were retimed or whatever, but we actually timed it several times [28:42] pulling out of the funeral home with a funeral procession and a lot of times we [28:46] can't even get out of the driveway and make it to the intersection before the [28:49] light changes. >> Yeah, we [28:52] based on our traffic counts, we are definitely looking [28:55] at basically all of that corridor of work [28:59] as you know, if you go the wrong time down Chestnut, you're hitting every [29:03] » Every light. You Yeah, the timing is >> So we are looking at timing [29:07] coordination >> Okay. [29:09] » general traffic signal coordination. You know, you're not going to get 100 [29:13] cars through the light, but we're hoping that it'll be an improvement in general [29:16] at the end. >> Right. So with the new design given [29:20] there's four lanes and a suicide lane, I believe that's the plan. [29:23] Okay. >> No, four lanes and a left turn lane. [29:28] » Yeah. Okay. [29:30] » We call it a center turn lane. >> Right. [29:33] » It's the word suicide. >> Yeah, well, that's I'm old so that's [29:35] what we used, you know, >> [laughter] [29:36] » that's a >> They don't like that word too. [29:38] » But is there is there any shoulder to that between the roadway and the curb? [29:43] Is that where the bike lane will be or >> No, no bike lane. The shoulder's about 2 [29:49] and 1/2 ft wide. The bikes will be on the multi-use path. [29:54] » Oh, okay. >> And as far as far as the signals, I'm [29:57] sorry. As far as the signals go, the existing signals that are out there, [30:01] they they float like they're so old that they don't like keep the timing. [30:06] » Yeah, because I noticed this big change. >> float from the original design. The new [30:10] signals will have it in encoded and will perform much better and [30:15] they reset every day like to midnight. So if they float by say 3 minutes today, [30:21] it'll reset at midnight. And the ones now might be 3 minutes today, 3 minutes [30:26] tomorrow, 4 minutes the next day, 2 minutes the one after that and then [30:29] things start to float around. So these will be improved. [30:35] One of the options for you at the funeral home, I would think is if you [30:40] got the violin police involved and they could probably just go into the box and [30:45] preempt to let everybody out if you have that [30:48] much traffic. >> notice that it there's always a rapid [30:51] change. One day it's longer, the next day it's not. And it's just probably The [30:55] other The reason I asked about if there's any [30:58] little bit of room between the curb and the existing street. When we have a [31:02] snowstorm, we always clear our sidewalk out there. Because we have all the [31:06] traffic from Memorial Veterans School. The kids walking. [31:10] And a lot of places don't clear their sidewalks, so they go out onto the [31:13] street. And when they do, I said I can't even look out the front [31:18] door. Because all these kids are walking in Chestnut Avenue and they tend to move [31:22] a little fast there. So hopefully this will alleviate part of that. So. [31:27] Okay. All right, thank you very much. >> Thank you so much for those remarks. [31:34] Would anyone else have any question? Oh. >> I apologize. I have to step out for [31:39] another meeting at 6:00, but uh Stephanie and Rick can handle any more [31:43] questions. Thank you guys for coming out. We really appreciate it. [31:47] » There's another question. >> Okay. [31:51] » Thank you. >> You. [31:53] » Cathy Malone, 622 South 4th Street. Um two questions. That you just talked [31:58] about helping with the flooding that happens. Is it going to be going to be [32:02] addressed at West and Chestnut as well? Cuz it's like a pond over there when it [32:06] rains. >> Yeah, we're We're evaluating all the [32:10] storm water. Uh there'll be a new basin that we're going to be installing [32:15] um and we're adding inlets and replacing pipes as appropriate to help eliminate [32:21] uh the flooding out there. The problem is when you have uh no little to no [32:26] shoulder, um that that lane tends to fill up with water. So we're trying to [32:32] put in more inlets to collect the flow instead of having it bypass the inlets. [32:37] and we're trying to upsize our our our pipes to be able to convey the flow [32:43] without a backup. But yeah, we definitely see in our modeling, we [32:46] definitely see there are problems out there. [32:48] » Yeah, cuz it's not a shoulder issue. It's the whole road all both lanes are [32:52] flooded. >> Yeah, understood. It's the whole thing. [32:55] Some of the systems are undersized. >> We're going to make into a basin. We own [33:00] that one corner across from Rex. >> Oh, perfect. [33:03] » Which corner is >> This southwest corner. [33:07] Say that again? >> At West, West and Chestnut. [33:11] » It's like an open basin. [33:14] » Yeah, cuz it floods there a lot. My second question is we have a proposed [33:18] start date of June of 20 2027. [33:22] Do we have an estimated completion date? [33:28] » Um >> Uh [33:30] possibly around 300 days past that start construction. [33:34] » About what? >> 300 days. [33:36] » Okay, so about a year. Almost a year. Okay, this just so I have [33:40] an idea. Thank you. [33:43] I think we need to take a new question over here and then you next. Okay. [33:49] Thank you. >> Are you done? [33:51] » Marcos Diaz, 724 East Chestnut Avenue. In those 300 days that you guys going to [33:57] be working in that area, most of the business, I own a business [34:01] over there, is going to be really affected by the construction. So, how [34:05] does the city any plans for the business that practically is going to be closed [34:09] on those days? >> So, we're going to try and keep the [34:12] roadway open the entire time. It'll just have lane closures here and there. [34:17] Uh but the contractor will coordinate with the businesses or residents if [34:21] there is an actual road closure. >> Did you have another remark? [34:29] » Anatol Vassiliev again, just a comment about the flooding. [34:32] I don't know if uh your company has videoed the drainage system at all, [34:37] but typically [34:40] uh our systems in violent get full of trash very quickly. [34:45] In my day, we had two crews that did nothing but clean out drainage systems. [34:50] That was usually very effective. And I don't know if the city still does [34:55] that. Uh a lot of things have changed since I left, but uh many times a [35:00] drainage system will flood because it's half full of trash, debris, sand, and [35:06] all the other stuff cuz it has no place to go [35:09] literally when it gets in there. So, I would just tell everybody and and [35:14] don't know how much you've communicated with the city, but you should ask the [35:18] city to clean it out first, then video it, or at least be aware of all these [35:24] trash problems cuz the systems under Chestnut Avenue were uh very adequate [35:29] for for many years after we installed them, there was virtually no flooding. [35:33] But, that was 30 years ago. A lot of things happen in 30 years. But, [35:38] especially the intersection of Chestnut and West, [35:41] that used to be a pond, but there's a very big system underneath there. But, [35:47] as I drive by, I always see the inlets are full of trash, stuff stuck in them, [35:52] branches are stuck in them. Well, you know where that goes? Not too far. It [35:57] goes a few feet in there, and that plugs up the effectiveness of the system. So, [36:02] I would just repeat, make sure you contact the city and see [36:06] what they can do about cleaning them out. It's free. [36:10] That's what they do for a living, or at least that's what they used to do for a [36:13] living. So, before you design a much bigger system, just make sure [36:18] that the one you have is working. This is my two cents. [36:22] » Okay, understood. We have uh already had the system cleaned and [36:26] videoed. Uh the undersizing is because the storms [36:32] that are regulated now are much larger than the storms that [36:36] were regulated 20, 30 years ago. So, just in our our calculations and [36:41] modeling, um we have to design to a larger frequency storm [36:47] um than what they did 30 years ago. That's why it says the systems are [36:51] undersized. [36:54] Some of the systems. Not all of them. [36:57] » My name is Pedro Varela. I live in Chestnut and Fourth Street. [37:03] I'm sorry. [37:07] » The uh system that's that's there now is um [37:11] there's one on each side. On the south side, it's like a five, six uh pipe [37:16] manifold perforated system. And uh we have recently had uh [37:22] uh emergencies there because the system has failed. Um [37:26] the system is silted up. Um so, that's going to need rehabilitation. So, that's [37:31] going to be an important one. [37:35] » Uh my name is Pedro Varela. I live uh Chestnut and Fourth Street. [37:40] Uh my question is the new sidewalks are going to be built by all by concrete? [37:46] Uh because in my section, there is a part concrete and a lot of strip of [37:51] grass and some small trees along [37:56] along the the way. And uh the new sidewalks is going to be [38:00] all concrete? Uh without the trees [38:05] and no grass? >> And we will have concrete sidewalks. Um [38:10] and what was the address again? >> Uh Chestnut and Fourth Street. [38:14] » Oh, over on Fourth Street? >> Yeah. [38:16] » I'm familiar with that area. There are a lot of homes on the corner [38:20] um going eastbound on the north side, [38:24] um going halfway up the block to about 418 Chestnut Avenue, there is no [38:31] sidewalk there. There's a There's actually people walking through there [38:34] all the time. There is I've actually seen flooding [38:39] also spillage both flows coming out of this this well, so it's probably the [38:43] reason why there's a sidewalk there is because there's part of the system still [38:48] remain from over there prior to the construction of Chestnut Avenue many [38:52] years ago. So, there's a lot of flooding there. [38:56] » Uh, my other question is that the Why you doing the pave [39:01] all the sewer section, all the sewer system are going to be [39:06] uh, updated? I Somebody's going to make sure that [39:10] everything is doing the way it's supposed to before you pave [39:15] because when I receive a letter, it was saying that [39:19] uh, if there is any problem with the sewer system through from your house to [39:24] the sewer system, [39:26] once it's paved, you cannot do anything. >> Correct. Yeah, you're you're talking [39:32] about just for like utility. >> Yes. [39:34] » Correct. Yes. So, if if you need to make any upgrades, I I would suggest doing it [39:40] now. Um, [39:42] or in the near future. [39:46] Um, >> Oh, okay. Thank you. [39:51] » Thank you. Does anyone else have any questions or [39:56] any comments? Okay, yeah. [40:03] » Starting on Chestnut Avenue, there's a drainage ditch that goes [40:09] to Walnut Road, then it continues to the Boulevard and [40:14] continues after that. Is there any plan to utilize that [40:20] in water retention or water disposal from Chestnut Avenue? [40:28] » We cannot We cannot increase the flow to that particular location. [40:33] We have to match the discharge that we have now. [40:39] So, we do discharge to the the existing [40:43] system discharges to that particular uh ditch, [40:48] but we cannot change the amount that we're discharging to that ditch. [40:54] Without a permit. Yeah. [40:56] » Thank you. >> Is that located? [40:59] » It's um Tarmac Branch or something? Tar [41:04] It's uh It comes across the near the railroad [41:08] and Chestnut. And then it goes behind [41:11] um the homes on Chestnut. And like you [41:16] said, out to Walnut and then eventually flows into the uh [41:23] What's the name of the branch there? [41:26] Not Blackwater. I'm sorry. I'm drawing a blank. [41:34] But yes, we we are not looking to put any more water there. [41:43] » Okay. Does anyone else have any questions or any comments you'd like to [41:47] share? [41:50] No? Oh, okay. Yes. [41:53] » Uh regarding our property on Chestnut Avenue where our parking lot is, uh this [41:57] was built before it was required to have runoff and spillage. So, we actually at [42:02] the end of our driveways at the entrance and the exit, we had the drainage basins [42:06] which would run out onto the pipe that went by Chestnut Avenue. [42:10] About 6 7 years ago, we had a sinkhole develop in one of our gardens. We didn't [42:15] know what it was from. So, I called GE Mechanical, they came [42:18] over. Uh they dug it up and they went down [42:21] there with a camera and they said where it runs out to the terracotta pipe [42:25] along Chestnut Avenue, which was installed many years ago, the terracotta [42:29] pipe is collapsing. So, they said what's happening is your [42:32] spillage is going in there, going directly in there and it's and it has [42:36] nowhere to go, so it's backing up cuz we were getting a flood out by the end. So, [42:40] they said um I would just pave over it in your parking lot, over that one, [42:46] and then just let it run out. And I called the city and I spoke with the [42:49] mayor's office and I I said I would appreciate it if if a city engineer [42:53] comes out and signs off on this because if our runoff from our parking lot [42:58] floods Chestnut Avenue from our location, 1110, down to Evelyn Avenue, [43:03] and it creates a danger in that in that lane, [43:07] I don't want to get blamed for that. So, I had two people come out and everybody [43:11] agreed that was the simplest solution. They said eventually they'll fix that [43:14] portion of the pipe, but they don't know when. [43:17] So, that I do know cuz they went under there with cameras and they looked and [43:21] the terracotta pipe that's out there is completely disintegrating. It's [43:25] insufficient, they told me. So, I just wanted you to be aware of [43:28] that. >> Thank you. Any terracotta pipe would be [43:32] replaced automatically. We do have corrugated metal pipe that [43:35] needs to be replaced also because that is also at at end of its design life. [43:40] So, we will be replacing pipes in the street. [43:46] » And anyone else? >> I'm sorry, that's a What What was the [43:48] address? >> 1110 Chestnut Avenue. [43:52] » 1110 East Chestnut Avenue. >> Okay. And And the pipe is actually in [43:57] Chestnut. >> Yeah, it's in Chestnut and everyone's to [44:00] Valley Avenue. >> It runs to Valley Avenue at the [44:02] intersection there. >> Okay, thank you. We'll double-check [44:05] that. [44:09] » Does anyone else have any comments that would they they would like to share or [44:13] any questions? [44:17] No? Okay. Thank you. [44:25] » Okay. [44:29] I will end the recording. Uh and then if anybody else comes in and [44:34] has some questions, we'll turn the recording back on. It's currently 6:50 [44:39] uh sorry, 5:52 and I'm going to stop the recording. [44:43] Thank you. [44:49] » Thank you all for coming out tonight. We really appreciate your feedback and your [44:54] questions. Oh, hey everyone. When you came in, we [44:59] we actually gave you a survey. So, if you'd like to fill it out and give it [45:03] back to us, we will be factoring that into [45:07] our the design going forward. Although, [45:11] what