[1:05] Yeah, just all right. [1:11] I uh more stomach [5:06] Would [5:13] you say [5:24] I have [5:50] Not going to get much. [6:04] All right, if everybody could make sure. [6:11] » Mine turned green. Hello. There you go. [6:47] technical difficulties. We're getting [6:49] there. [6:51] We're all here though, so that's [6:52] exciting. [6:58] Hey, any [7:00] good [7:27] ready. Okay. All right. We're going to [7:30] go ahead and open today um the September [7:33] 3rd design review board. [7:37] Um first item is the approval of the [7:40] June 4th DRB minutes. Did everyone have [7:42] a chance to look at those? Emiled them [7:44] out separate. Anyone care to make a [7:46] motion there? I move the approval as [7:49] presented. [7:50] » A second. Hey, motion and a second. All [7:51] in favor? [7:52] » I. [7:54] » All right, Tim. Any announcements today? [7:56] » No announcements. [7:58] » Okay, [8:00] want to roll on to item two? [8:02] » Yes. Good afternoon. You've got me for [8:04] three more meetings. [8:07] [laughter] [8:08] » Retirement countdown. [8:12] At least I can't tell you the number of [8:13] days like Bob can, but yeah, I guess [8:16] it's the retirement countdown. [8:17] » All right. [8:18] » So [8:24] So this is a less than minor development [8:27] application submitted by by McNeel [8:29] Carroll Engineering requesting approval [8:31] to reduce the originally approved square [8:33] footage of a commercial building on [8:36] 56.07 [8:37] 7 acres with the future land use of and [8:40] zoning of Bay Walton Sector Plan Town [8:43] Center properties located in district 5 [8:45] on the north side of Highway 98. So this [8:49] was previously approved by this board on [8:51] January 5th, 2023. [8:55] So they're wanting to downsize this [8:57] building from 19,734 [9:00] square ft to 11,279 [9:04] square ft. [9:06] So, with that, I'd please like to enter [9:08] the staff report into the record. [9:11] » All right. So, noted [9:12] » And I'll answer any questions or I'll [9:15] turn it over to the [9:17] It's pretty straightforward. It's [9:19] basically the same [9:22] building [9:24] but smaller. [9:26] » Any questions of Tim? [9:30] Mr. Carol, do you [9:38] Good afternoon. Robert Carroll, McNeel, [9:40] Carol Engineering, 17800 Panel City [9:42] Beach Parkway. We are the engineer of [9:43] record. As Tim stated, we were here [9:46] several years ago. It was a two-story [9:47] building uh and a completely different [9:49] architect. So, we have completely [9:51] changed the project. They're still [9:52] allowing us to be part of the team, so [9:54] we're grateful. But, uh the roadways, [9:56] the parking, all of those are part of [9:58] the master plan. Those were previously [9:59] installed. We came here before. Uh so, [10:03] Basically, all the infrastructure around [10:04] it is installed. This is just for the [10:06] building itself. The architect is here [10:08] and she's brought a nice board and some [10:11] colors and uh I think she's gonna [10:13] control the show, but I was just here in [10:15] case there were any site related or any [10:16] questions that I could answer. [10:19] » I have one um site related question on [10:22] the first um [10:26] site plan that's actually includes the [10:28] frontage on Highway 98. There is a [10:31] sidewalk shown and I can't recall if [10:33] that sidewalk actually exists. And the [10:35] reason part of the reason I'm asking is [10:36] last month we had the uh large water [10:39] sign come before us. [10:42] » There's not one along 98. There the [10:43] sidewalks are internal with the roadways [10:45] but not along 98. We do not have a [10:47] walkway out there. [10:48] » Yeah. In other words, the packet that [10:49] you all submitted shows a sidewalk on [10:52] Highway 98. [10:55] » New sixoot sidewalk. Yes. [10:58] So, I was just curious. I mean, my [11:00] question might be direct better directed [11:02] to Tim. Um, but I know that that [11:07] requirement to provide a sidewalk on the [11:10] public rideway is frequently a [11:11] requirement of the project. Is this is [11:13] there supposed to be a sidewalk on [11:14] Highway 98? Well, not with this [11:17] particular project because it has no 98 [11:19] frontage, but yeah, I mean, the code [11:21] does require [11:24] » I don't go by there really, so I don't [11:28] think it's currently there. [11:30] » Okay. [11:30] » I'm not sure, but when DOT widens the [11:34] road, they will put in the sidewalk. [11:36] » DOT's widening. [11:39] » Yeah, 98 is going to be widened all the [11:41] way to the Bay County line. [11:44] I mean, pushed it back. I mean [11:46] » Oh, I I see what you're saying. Yeah, [11:47] but not as part of this project. [11:49] » Not as part of this project. But in [11:50] Okay. with the 98 widening DOT will [11:54] install either a sidewalk or a mixed uh [11:58] a multi-use path like this last segment [12:01] they did from Mac Bayou Road to 3A. They [12:04] put in a 10- foot multi-use path. [12:07] » Okay. [12:09] All right. I guess I'll uh maybe I'll [12:10] bring it up as new business or something [12:11] at the end of the meeting. Um [12:13] » But this this particular project has no [12:16] 98 frontage. [12:17] » Okay. Yep. I pose the question because [12:19] it was included in the packet. So [12:22] » The internal sidewalks there are so we [12:24] have the on the far east side. We have [12:27] sidewalks from there all internal all [12:28] the way through Publix all the way to [12:30] the bank. [12:31] » Yep. [12:31] » So okay. [12:33] » Pedestrians have free will to walk but [12:34] just not along 98. Yep. [clears throat] [12:37] » Thank you. [12:38] » Thank you. Thank you. [12:46] Hi, good afternoon. My name is Paula [12:48] Neil and I'm with the architect of [12:50] record [12:52] Neil in [12:56] uh I did bring a finish board um for [12:59] y'all to look at. Um do you mind if I [13:02] come up? [13:13] So, we do have it's a planned um retail [13:17] mixed use. Um I think St. Joe is [13:20] planning on putting a restaurant in one [13:22] and just a couple retail spaces in the [13:25] rest. And um it does front both Merchant [13:28] Lane and Port Plaza Way. and it's just a [13:34] small 11,000 square foot building. Um [13:39] the the character of the facade matches [13:42] the rest of the town center with just a [13:44] couple little tweaks um meeting the [13:47] scenic corridor requirements and the [13:49] mental color palette um which we're [13:51] showing there. So, um but the plan is to [13:57] have a little patio in the front and [14:00] then a little patio behind um for the [14:03] restaurant tours and uh and otherwise [14:07] it's uh really in line with the rest of [14:09] the town center development. [14:12] Let me know if you have any questions. [14:15] Be more than happy to answer. [14:20] Any questions of our architect? [14:25] » Uh, just to kind of confirm for the [14:27] record, all of the mechanical units are [14:30] located. Um, where and are they all [14:33] screened? [14:34] » So, actually, I did want to ask about [14:36] that. I know one of the scenic [14:38] requirements is a metal uh roof and we [14:45] have parapits around the entire roof. [14:48] So, you will actually [14:50] that roof assembly and we're doing a low [14:53] slope quarter inch per foot and so we [14:56] feel like a PVC roof makes more sense in [15:00] that case. Yes, the parapit is high [15:02] enough to completely conceal the [15:04] mechanical units which will be on the [15:06] roof as well. It'll also make flashing [15:10] to all the um curbs associated with [15:13] those mechanical units much easier. Uh [15:16] we do want [15:19] Sarnophil PVC product which is fire [15:21] resistant. Um it has you know the [15:24] Florida building code approval. It has [15:26] Miami Dade um approval. So I mean it's a [15:31] it's a good quality project that will [15:33] reduce you know that will resist any you [15:36] know wind uplift or anything like that. [15:39] Um so we are asking for a variance on [15:42] that. [15:45] I'm not sure if there's a process that [15:47] we need to go through to get approval [15:49] [clears throat] on that. Our drawings [15:50] are currently showing the metal roofing [15:53] only because that was a requirement, but [15:55] we would like to change if possible to a [15:58] PVC roof product. [16:01] » Tim, can you answer a question? [16:03] » Yes. [16:04] » I mean, the metal roof requirement, in [16:07] my opinion, was always associated with [16:09] sloped roofs because we don't want [16:11] asphalt shingles on 98. [16:15] I never thought that that applied. I [16:16] wouldn't have even thought this was a [16:17] variance if they have a fully parapit a [16:19] full, you know, four-sided parapit on [16:22] this building that we would have to use [16:25] a variance to approve a like a TPO type [16:28] roof. [16:35] » We have approved membrane multiple [16:38] times. The code says barrel tile, [16:42] standing sea metal, concrete tile, [16:44] slate, copper, wood shingles, slshakes, [16:47] dimensional asphalt shingles, but [16:49] typically a parapit roof is is membrane, [16:51] and we've done that plenty plenty of [16:53] times. [16:54] » So, I mean, I think what you're [16:56] proposing is totally fine. I just [16:58] » I put standing seam metal because that's [16:59] what that's what you have on there. [17:08] notion. [17:12] » Well, and that's very typical. Like I [17:14] said, we we've improved that plenty of [17:16] times just because it is very typical. [17:18] » Do we have to approve that because it's [17:21] specifically not one of the items [17:23] listed. That's not something that can go [17:24] on a staff level. [17:26] » We [17:28] never have in the past. [17:29] » An incredible burden. [17:30] » We never have in the past. So from a [17:33] process standpoint, because it was not [17:35] advertised as a deviation, we cannot on [17:38] the floor approve a deviation. [17:40] » Right. All she really needs to do is [17:42] resubmit it with the membrane route, [17:45] » Right? And I don't think that you get [17:48] any push back about that. Um the the [17:50] deviation request process is is not um [17:54] we're not like a like the board of [17:56] zoning appeals, you know. [17:57] » So we had originally submitted it as a [17:59] PBC and that was a [18:08] Technically, it's not, but I mean, we've [18:11] » We've approved that plenty of times. [18:13] » That might be something we need to [18:15] adjust in the code then. I mean, if we [18:16] think about a Walmart or any of these [18:19] large buildings, they all have a [18:20] membrane style roof. [18:22] » Unfortunately, it doesn't look like [18:23] they're going to let us move forward [18:24] because of SP180. and you know we were [18:27] in the process of doing these changes [18:30] and I'm very much of a believer that [18:32] it's not putting an additional burden on [18:35] anyone. Um but yeah, I mean that would [18:38] be ideal if we're in the process of [18:40] changing it to add that. [18:42] I don't know exactly how that came about [18:44] because it's not specifically listed but [18:47] we've been approving those for years. [18:50] » Right. [18:53] So from a process standpoint, [18:55] unfortunately what we can do tonight is [18:58] um take action on the project as it's [19:00] presented. [19:01] » Um but with a separate project um [19:05] request that can come um probably next [19:09] month if you can get that. [19:10] » I think you can just make a condition [19:12] and she can resubmit the plan. [19:15] » I mean we've never made anyone else do a [19:17] deviation for membrane roof. So why [19:20] would why would [19:22] » It's not going to alter [19:23] » It this I mean clearly in the drawings [19:26] it's not an AR it's not a standing seam [19:28] roof. You couldn't do what what the [19:30] drawings show with a standing seam roof. [19:32] So I I think it's just the words on the [19:34] piece of paper. [19:36] » Um and so uh I'm very comfortable. Um [19:40] » Okay. [19:42] I just don't want there to be any any [19:43] issues with [clears throat] with process [19:45] on how we've done this. You just need to [19:47] make it not a condition per se, but just [19:50] put in your motion that they can change [19:52] it out and then they just submit new [19:55] plans. [19:56] » Yeah. With the membrane. Well, actually, [19:58] in this case, it's probably just a [19:59] labeling thing. [20:01] » I'm totally fine with that. I just want [20:03] to make sure that the process isn't [20:04] going to be [20:04] » Correct the notation. Basically, that's [20:06] it. [20:07] » Yeah. I think all she would have to do [20:09] if you guys approve it tonight is just, [20:11] you know, upload a new set of plans and [20:14] those will be the the final the final [20:16] plans. [20:17] » Okay, I'm good with that. [20:19] » And we could cloud all those notes so [20:21] that you can see that. [20:23] » And I do appreciate the sections you [20:25] provided with the view lines to the [20:27] rooftop equipment. That was very [20:28] helpful. [20:30] Yeah, we even did one all the way to to [20:32] 98 so that we saw that [20:34] » You can see that there's just no [20:36] visibility whatsoever. [20:38] » Yeah, very helpful. [20:41] » So, I have another um question. This [20:43] this will probably confuse everybody for [20:45] a second, but just indulge me. Um is [20:47] there a a person who actually works with [20:49] the St. Joe Company present? [20:52] » Hi. [20:53] » So, um I just came from the South Walton [20:55] Fire District budget meeting. Um I'm a [20:58] commissioner on that board and um at the [21:01] last meeting we went through this board [21:04] went through a lot of effort to make [21:06] sure that uh the sign proposal that [21:08] y'all brought was approved and we we [21:10] kind of been over backwards to work [21:11] through all the little challenges that [21:13] came up and I think we're going to do [21:14] the same thing tonight on this. Um, but [21:17] uh, one of the things that I'm working [21:18] on with that hat on, this fire district [21:20] hat on, is is trying to get the fire [21:22] station going in Water Sound and clearly [21:25] you guys are moving forward with a lot [21:26] of development. And right now, uh, my [21:29] understanding after several [21:30] conversations is we're hung up on [21:33] getting an easement sorted out between [21:34] Florida Power and Light and St. Joe. And [21:37] I just want to encourage you to get [21:39] whatever it needs to get done done [21:41] because we're getting very frustrated [21:43] about the amount of time and money. We [21:45] have a fire we have a crew of guys and a [21:47] truck crammed into the Inlet Beach [21:49] Station that we need to have there that [21:51] are supposed to be at this new fire [21:53] station. So, um we really need to get [21:55] that going. So, uh if you want to share [21:59] with the other folks in your [22:01] organization that at least one person [22:03] who sits on multiple boards is getting [22:05] very frustrated about this. Thanks. [22:08] » I bet who's not here is Florida Power [22:10] and Light. [22:11] » They're Yes, I know. [laughter] [22:13] But uh I think it's Kathy Katherine um [22:19] you you have the background to know what [22:20] it is I'm talking about. So I just uh [22:22] again I'm uh going to show my um good [22:26] faith that at whatever point that we [22:28] finished our discussion I'm going to [22:29] make a motion to approve the project. [22:31] But if you bring another project back I [22:34] might not be so nice next time. [22:41] Is that an actual motion you want to? [22:43] » Oh, yeah. Everybody I I didn't want to [22:44] cut short the uh the discussion. I think [22:46] it's a wonderful wonderful [22:47] » No, I was just commenting for our light [22:49] takes forever to do everything. So, [22:50] » They do, but this has been this has been [22:52] many years and we are starting to have [22:54] um one of the things we discussed is how [22:56] many times we've rolled over the m the [22:57] budget. [22:58] » Sure. [22:58] » For this fire station and [23:00] » The fire station is going to be there [23:01] for a reason. Yeah. It need it needs to [23:03] happen. [23:05] So anyway, with that, if uh if we have [23:07] finished discussing the building, um I'm [23:10] gonna I'll make a motion to approve the [23:12] project as presented with the [23:14] understanding that the um roofing [23:17] material inside the parapit is [23:19] anticipated to be a PVC I believe. [23:22] » Correct. [23:23] » Um in lie of the standing seam metal. [23:26] » Second motion and a second. All in [23:28] favor? [23:29] » I. [23:30] » Motion passes. Thank you. [23:31] » Thank you. [23:34] All right, Tim. Item three, panhandle [23:37] patio. [23:38] » Well, it's actually honest, but I I I [23:40] did misspeak. I guess there is a an [23:42] announcement. We normally do [23:45] continuances and whatnot under that [23:47] heading. And item number four is being [23:50] requested to be removed from the agenda [23:53] because it was already previously [23:55] approved by this board. So, it did not [23:58] need to come back. So, we're just asking [24:01] you to remove it from the agenda. [24:06] » The monument sign for Santa Rosa Plaza. [24:11] » Yes. It It's a little tricky because you [24:14] guys approved it with their MSP. The MSP [24:16] doesn't normally approve monument signs, [24:21] but you didn't want to have them to come [24:23] back, have to come back. It was right in [24:26] front of you. So, you approved it at [24:29] that time and I guess it just didn't get [24:32] taken off the agenda and we don't see a [24:34] reason to approve it a second time. [24:40] » Tim, could you clarify which project [24:42] that is? [24:43] » Number four, Santa Rosa Plaza monument [24:46] sign. [24:48] Santa Rosa Plaza is at the corner of Don [24:50] Bishop Road and Highway 98. [24:52] » Okay. So, in the minutes of the last [24:54] meeting, Santa Rosa Plaza MSP [24:57] It says there was a discussion regarding [24:58] building colors depicted in the packet [25:00] and it was noted that the monument sign [25:01] was not part of this approval. [25:03] » Oh, [25:10] » Well, we just approved. So, we need to [25:12] open the minutes back up and fix that. [25:16] So, I did add a note in the uh final [25:19] decision of the workflow of Energ [25:21] stating that and I rewatched the video [25:24] that we did or that this board did [25:28] make the approval a separate approval [25:30] for the master sign plan and then a [25:32] separate approval for the monument sign. [25:35] Um since as what Tim said, [25:39] » No [25:48] Okay, [25:49] » Got it. So then [25:51] » Staff approved the monument sign. That's [25:53] how the motion read, but that was my [25:56] understanding of the motion. [25:58] » So, [26:00] » Okay. But I think we need to clarify the [26:02] minutes because this sure reads like we [26:04] specifically pulled the monument sign [26:05] out. I I think we should we should amend [26:08] these minutes to read that the monument [26:10] sign was approved was considered [26:12] administratively or something to that [26:14] effect. [26:15] » Okay. [26:16] » Is that [26:17] » I think that's fine. [26:19] » I think proceed procedurally I think any [26:22] we can reopen items. [26:24] » We can. Yeah. So I guess is that does [26:26] that need to be a vote to reopen the [26:28] item? [26:30] » The official [26:30] » The minutes. [26:32] » Yeah. The minutes. Yeah. [26:33] » Okay. [26:34] » Okay. So [26:38] Y [26:43] » Oh, yeah. We can do that, too. [26:44] » So, I guess I'm going to move I think I [26:46] think the correct uh parliamentary [26:48] procedure is to reconsider. [26:50] » Okay. [26:50] » So, I make a motion to reconsider [26:53] » The meeting minutes of [26:56] » June [26:57] » June 4th. [26:59] » Right. We have a motion to reconsider. [27:01] » Second. [27:01] » All right. [27:03] » All in favor? [27:04] » I. All right. [27:06] » May I May I ask what that means for the [27:08] monument sign? Are we still going to [27:10] hear that? [27:11] » No. [27:11] » Even though my intent is just to get the [27:13] minutes look like we [27:15] » Okay. [27:15] » It sort of looks like we we didn't want [27:17] to approve it the way the minutes are [27:19] written and [27:20] » But I remember we did say it could be [27:22] approved [27:22] » Administratively. Yes. [27:23] » Right. [27:24] » Okay. So I get I guess now the minutes [27:26] are on the table. [27:27] » The minutes are on the table. So if we'd [27:28] like to have a motion to continue the [27:30] minutes to the [27:32] um October [27:36] October 1st. [27:43] [laughter] [27:45] » October. [27:47] » We're gonna miss you, Tim. [27:49] » Can you just come back for fun? Um, [27:52] October 1st, uh, DRB meeting. [27:55] » So moved. [27:58] » All right. [28:00] I second. Okay. All in favor? [28:03] » I. There we go. [28:04] » Um, okay. Now, heading back to uh the [28:07] removal of item four. Um, if we can [28:13] » Don't know what motion, [28:14] » No actions needed. We can just go. Okay. [28:17] So, the next item on our agenda was item [28:20] number three. So, let's head up to [28:23] panhandle patio building sign. [28:25] » Okay. Okay. So, the panhandle patio [28:27] building sign item number three, [28:29] SGN260099. [28:33] This is a scenic corridor sign [28:35] application submitted by submitted by [28:37] Duncan Signs and Lighting on behalf of [28:39] Northline Investments LLC requesting [28:42] approval of a building sign measuring 35 [28:44] in by 221 in for a total of 53.71 square [28:49] feet on 1.63 63 plus or minus acres with [28:52] a future land use of mixed use in a [28:54] zoning category of coastal center. [28:56] Properties in district 4 at 1255 US [29:00] highway 98 West and can be identified by [29:03] the parcel number in your staff report. [29:05] May I enter the staff report into the [29:07] record? [29:07] » All right. Noted. [29:08] » Um may I also note that the applicant [29:11] was not able to attend today? Um so if [29:14] you do have any questions that need to [29:16] be answered, I'll do my best to answer [29:18] them and if I cannot then I'll have to [29:20] pass those questions on to the applicant [29:22] um if you all decide to continue based [29:25] on those questions. With that said, um [29:30] their proposal meets the minimum [29:31] technical requirements and I don't have [29:33] any comments further comments on that. [29:36] So, do you have any questions for me? [29:39] » Um is there any building lighting or [29:41] anything that's going to illuminate the [29:42] sign? [29:45] » No, they're not proposing [29:48] any lighting. It's a non-illuminated [29:50] sign. [29:52] So, [29:52] » And there's nothing existing on the [29:53] building that [29:56] » I think the question is, is there [29:57] anything on the building that's going to [29:58] light up the sign in place of the sign [30:00] being proposed is not illuminated? [30:03] » No. From what I'm seeing in their [30:05] renderings there, there's lighting on [30:07] the building. Uh, but it's not directed [30:10] upward toward the sign. [30:12] » Just sconce lighting on the [30:13] » Correct. Correct. [30:14] » Nothing that they're going to be able to [30:15] adjust to shine down or move around or [30:17] anything like that. No. [30:25] » Any other questions of um staff? [30:28] » Um I [30:34] » So I understand the letters based on the [30:37] exhibit to be [30:39] 20 and 12 in tall [30:43] and they are described as being a half [30:45] inch thick PVC. [30:48] But the application [30:51] says [30:53] raised individual routed letters that [30:55] are between six and 12 in in height [30:57] shall have a minimum height of 3/4 in [31:00] and raised individual routed letters [31:01] between 12 and 24 in shall have a [31:03] minimum rise of 1 in and the applicant [31:06] had written NA [31:09] all that but it seems like they are not [31:11] thick enough [31:14] I don't know if they can laminate two [31:16] pieces inch thick PVC together. But I I [31:21] think for a 20 inch tall letter, it has [31:23] to be one inch thick. [31:24] » Okay. [31:26] » I would agree with you. The [31:28] dimensionality that we've talked about [31:31] um [31:43] and the 9 in letters need to be at least [31:46] 3 in. [31:51] » I can pass that feedback on to the [31:53] applicant. Um, [31:59] yeah, I did not [32:03] Yeah, they did not propose that level of [32:06] thickness for those letters. [32:09] So, that's definitely something that can [32:12] be corrected. [32:16] Typically, if the applicant was here, we [32:18] would ask them if that they would be [32:20] acceptable of that as a condition of [32:22] approval. [32:23] » Um, [32:25] » From the conversations that I've had [32:26] with the applicant, I believe that they [32:28] would be they would be willing to [32:30] » To make those. [32:31] » Yeah. To make those changes. I don't [32:32] think that they would have any push back [32:35] because they really wanted to be able to [32:37] make it today, but I told them that I [32:39] would speak on their behalf. [32:41] » Okay. [32:44] I think in terms of the colors, the all [32:46] that stuff, it looks great. [32:49] » I guess do we uh would everybody be [32:52] comfortable if we approved it contingent [32:54] on the thicknesses meeting? [32:56] » I would. [32:56] » Minimum. [32:58] » Absolutely. [32:58] » Yes. [33:00] » Okay. [33:00] » Well, I will make a motion to Oh, I'm [33:02] sorry. We got more to go. [33:03] » Yep. I got um [33:05] » We'll finish with staff and then we have [33:07] a Yep. [33:09] And we may have actually missed that one [33:11] on origins because I don't have a check [33:13] mark next to that. Um, [33:17] if we opened and closed a public comment [33:20] session, we did not. [33:21] » Sorry, I scared them off with my [33:23] [laughter] [33:24] They moved pretty quick when [33:27] » Um, apologies then. Um, [33:30] let's finish up here and then we'll sort [33:32] my [33:34] hair. [33:35] » Any other questions? Any other questions [33:37] for item three? All right, seeing none, [33:40] anyone from the audience want to speak [33:41] on item three? And seeing no one, um [33:46] would you care to make a motion? [33:47] » I will. [33:47] » Okay. [33:48] » I move that we approve uh the panhandle [33:51] patio furniture building sign as [33:54] presented contingent on the [33:58] uh larger letters being at least one [34:01] inch thick and the lower uh patio [34:05] furniture [34:06] Word be 3/4 of an inch thick. [34:11] » Second. Have a motion, a second. All in [34:13] favor? [34:14] » I [34:16] » All right. The item passes. [34:18] » Um [34:20] » I did. [34:21] » Do we need to go back and take any [34:23] action for origins with the public [34:25] comment or [34:27] » Yeah. [34:29] » Is anyone from the audience here to [34:31] speak on item two, the origins building [34:34] less than minor? and seeing no one. [34:37] Sorry about that. [34:40] Got ahead of my check marks. [34:42] All right. Um so we have removed item [34:45] four. Um going on to item um five and [34:50] six, the Euro market signs. If you [34:52] wouldn't mind to present them together, [34:54] please. [34:56] So this is the item number five and six [34:59] zero market 3A building sign and [35:01] monument sign uh SGN260000101 [35:07] and 000000102. [35:10] These are both scenic corridor uh sign [35:12] applications submitted by Euro market 38 [35:15] LLC on behalf of ING Arc LLC. [35:20] Um requesting approval of the building [35:22] sign measuring 144 in x 24 in for a [35:27] total of 24 square ft and the monument [35:31] sign measuring 48 in x 72 in for a total [35:35] of 24 square ft on 649 plus or minus [35:40] acres with the future land use of mixed [35:42] use and a zoning category of village [35:44] mixed use. Uh both properties are [35:46] located or both signs are located in [35:49] district 5 at 4770 [35:52] US highway 98 west and can be identified [35:55] by the parcel number in your staff [35:57] reports. May enter both staff reports [35:59] into the record. [36:00] » So noted. [36:02] » So would this board like to start with [36:04] the building sign [36:06] discussion and then monument sign? [36:09] » Yep, we can do that. [36:10] » Okay. So, for the building sign, um, [36:14] what the applicant proposed appears to [36:17] meet our requirements. [36:19] Um, I did not have any further comment. [36:23] Um, [36:26] well, I did have a discussion with the [36:29] applicant about their rendering. Um, [36:32] under exhibit C. I know that we measure [36:35] our sign area based on the smallest [36:38] rectangle around that copy area as [36:41] possible. Um [36:45] I know that they were trying to do their [36:46] best there. Um so I'll leave that final [36:50] decision with the board um on whether [36:52] that will suffice. Uh but based on how [36:56] they measured their sign area [37:00] with the smallest rectangle around that [37:02] copy area, it does meet the requirement. [37:06] So do you have any questions regarding [37:08] the building sign? [37:09] » Do we have any additional information [37:11] about how the sign is constructed or [37:13] mounted [37:15] » Material [37:17] in there? And it appears like they [37:19] furred this out over the doors. It [37:22] appears like the [37:23] » In the rendering, [37:25] which looks fantastic, but it's it's [37:27] just hard to tell how [37:31] » It's like the applicant's here. [37:43] eight months ago, but I translate if you [37:46] don't mind. [37:47] » Okay, sure. Um, we'll finish our [37:49] presentation here and then we'll have [37:50] you come up. Okay. [37:56] » I can put how this lights go to the wall [38:01] and [38:03] lights inside. [38:07] » So, it looks like we have aluminum and [38:09] » LED. [38:11] We're gonna have you go down to the [38:12] microphone as soon as we're done with [38:14] our planner discussion and we'll invite [38:16] you up. [38:18] » You're gonna handle staff questions [38:21] first and then they're going to give you [38:23] an opportunity to [38:27] » Yeah, of course. [38:54] Do you have any other questions for [38:55] staff before I hand it over to the [38:58] applicant? [38:59] just if there's anything else missing [39:00] from the packet that might notate um how [39:03] this thing is actually connected or [39:07] where the wiring is going to to provide [39:08] the power or anything like that any sort [39:10] of [39:10] » No. [39:11] » Okay. [39:11] » No. [39:12] » And also I noticed there were three [39:13] other down lights proposed on this [39:15] besides just this sign that are not [39:18] currently on the building or are they [39:19] and just not shown but they're shown in [39:21] the rendering. [39:23] » It is hard to tell and that was not [39:25] provided in the packet. Um but based on [39:31] one of the images on exhibit C, uh the [39:34] first image, it appears that those [39:37] additional lights are not placed on the [39:39] building as of yet. [39:41] » Right. [39:41] » Um [39:42] » So that would not be something that we [39:44] would be approving today. [39:45] » No, it would just be for the facade [39:49] building sign and the monument sign. [39:51] » Okay. [39:59] Thank you. [40:00] » Okay. And I believe the applicants um [40:02] are definitely going to be willing to [40:05] make whatever changes are necessary to [40:07] help them reach compliance. [40:17] Um there in the photograph of the [40:19] existing condition, there is an object [40:22] of some sort that is sort of just a few [40:26] feet off the front of the building. I [40:28] don't know if that is that a for sale [40:29] sign. That object right there. [40:34] But I want to make sure if it's an if [40:35] it's another sign then it would have to [40:38] come out of course for sale sign. Of [40:40] course I'm not. [40:49] » This is like a 4x4 [40:55] like 4x4 and [40:58] » Oh it's just a post [40:59] » Like I put like a chain to the row we [41:03] cut after that. [41:07] » Okay. [41:08] » Only four by four. [41:09] » Okay. So, it does not appear to be [41:11] assigned. [41:11] » It's not a sign. That's great. I just [41:12] wanted to make sure. Yeah, it looked [41:14] permanent. Whatever it was, I wanted to [41:15] make sure it wasn't signed. Okay. [41:20] » Any other questions of staff on the [41:22] monument sign [41:24] » Or the building sign? [41:28] » And it's very similar renderings to the [41:30] monument sign [41:32] » Portion of this application, too. So I'm [41:34] I'm I'm guessing the rendering shows [41:37] that the monument side and the building [41:38] are very close in color. [41:40] » Yes. [41:41] » Whereas in existence right now they're [41:43] not part of that. So are they going to [41:46] be painting that monument sign to match [41:49] the building or are they making the [41:50] building darker to match the monument [41:52] sign [41:54] » Or are they are you going to fac [41:56] » So from the renderings my [41:58] » Different facade. My assumption is that [42:00] the monument sign would be painted to [42:03] match the color of the building sign. [42:06] » I think we'll have to ask that [42:08] » Necessarily the architecture of the [42:09] building, but maybe the applicant can [42:11] speak to that a little bit better than [42:13] what was provided in the renderings. [42:15] » Okay. [42:19] » Any other questions of staff? [42:23] » Okay. our applicant would come up and [42:25] we'll um to the microphone and state [42:28] your name for the record please. [42:32] » Hello. Uh my name is Vasili. Uh this is [42:35] Anna. Uh she open I help you uh here [42:39] from translated and opening this store [42:41] grocery store. And uh we don't want to [42:44] pay paint for this Stella. He's just put [42:48] like a letter that's it. We don't want [42:51] to paint [42:54] » And I don't know what I need. [42:59] Give you [43:01] » Um [43:03] » If you need something, you tell me. [43:07] » Guess one thing. We're on the building [43:10] sign right now. So, the building sign [43:11] letters are back lit, channel letters. [43:15] Can you confirm that the letters on the [43:17] monument sign are not backlit? [43:25] Uh we right now he's not to the lights [43:29] because I bring this one. We need like [43:32] uh put everything and then he's lighting [43:36] » On the the monument sign. The letters do [43:39] not have light or do have light [43:41] » Have light same but a little bit [43:43] smaller. [43:48] Same same leather, same material. [43:52] » We do. [43:52] » Okay, that's right. [43:55] » That's just not what the [43:57] » Yeah, the rendering shows that it's [43:58] looks like it's lit from above casting [44:00] down, but that the letters are not lit [44:02] themselves. [44:03] » But the letters will be lit just like [44:06] the building. [44:12] Uh you like looking like a photo [44:16] right now. [44:27] » So I I think I might be able to answer [44:29] that. So, it appears from the from the [44:32] renderings that the building sign [44:35] letters will be back lit, but the [44:37] letters on the monument sign will be lit [44:41] from that lighting that is Yeah, the [44:44] down lit. [44:44] » Okay. [44:45] » Down lighting onto those letters. So, [44:48] » And I'm wondering if that's just an [44:50] issue with the rendering. [44:51] » Yeah, I'm [44:52] » Because there's not a light there in [44:54] actuality. [44:55] » I'm I'm guessing that the rendering has [44:57] liberties. Yeah, we can do from uh if [45:00] you want to we can put like this lights [45:03] to the up and we can do uh put leather [45:07] with uh lights like this. How you [45:10] approve us? We put like this because [45:13] right now this photo uh GPT [45:17] » Yeah. [laughter] [45:19] » Yeah. Is the the monument sign the [45:22] monument sign out in front of the [45:23] building. Is it double-sided? [45:25] Yeah, he's double side but [45:33] yeah both side is uh we can put because [45:37] people when going you need see this [45:40] market [45:44] » Is then still compliant both side the [45:46] sign face [45:47] » Who side this side and behind side same [45:51] » So [45:55] From what I've been provided, um, [45:57] there's no way of knowing for sure that [45:59] it's double-sided, but they would [46:02] definitely need to add that to the [46:04] renderings [46:05] um, for clarity. [46:15] Yeah, as long as it's in the [46:17] » Yeah, we do allow doublesided monument [46:19] signs, but it would need to be defined [46:22] in um more detailed renderings. [46:28] I mean, I think if if this um math is [46:32] correct, then we we do have enough room [46:37] for the the two sign faces. [46:40] » Yeah. [46:41] » So, [46:42] um [46:45] » Based on the square footage of the copy [46:46] area, I think that they can make that [46:48] work. [46:50] » We would just need to, I think, address [46:53] that and conditions so that they don't [46:55] have to come back. [47:04] Um, [47:07] any other questions of our applicant? [47:11] All right. Thank you. Um, anyone from [47:13] the audience want to speak on either [47:15] item five or six? [47:18] And not seeing anyone there. Um, [47:23] does anyone have problem with the [47:26] monument sign being either [47:29] uplit or or sorry, down lit or [47:33] halo lit? [47:36] » As long as the maximum letter size is 24 [47:39] in, I'm [47:41] » Okay. [47:41] » They don't really have the structure [47:44] above for the overhead lighting right [47:45] now, right? you know that that crown is [47:48] applied like straight onto the face. [47:51] » So if it wasn't back lit, I think it [47:53] would actually need to be lit from a [47:55] ground light. So [47:57] » If they were preferring to do back lit, [47:59] I would just assume [48:00] » I think it would look better, too, [48:01] honestly. [48:01] » Yeah, I like that one. I like the back [48:03] lit because it really gives a nice [48:04] streamline look. [48:07] Um, I think that it probably makes sense [48:10] to include, [48:11] » But the address won't be back or it [48:14] will. [48:19] » How much glow are those? [48:22] [clears throat] [48:27] » It should be visible. [48:28] » They're allowed to halo light all of [48:30] these letters on the monument sign as [48:31] well as the address, right? [48:33] » Yes. [48:33] » Yeah. [48:33] » Okay. then that would probably be the [48:36] recommendation that they keep it [48:37] consistent. [48:38] » Right. Right. I would think that if [48:40] you're going to um have backlit letters [48:44] on the monument sign, it would make [48:46] sense to include the the address numbers [48:49] in that [48:52] just for consistency. [48:54] » And what does the board think about [48:55] keeping the existing sign a different [48:58] color from the building itself? [49:00] Um [49:02] » You know in the rendering they show very [49:03] similar [49:04] » And clean and streamlined. However, in [49:06] the existing [49:07] » It's not Yeah, [49:08] » Not at all. Yeah. [49:10] » Um [49:14] I mean we always ask that they do match. [49:17] Um [49:18] » Maybe whiteashing that. [49:20] » Yeah, I think I mean I feel like that's [49:22] probably [49:24] » It would make those reasonable [49:27] » Um for the monument sign to have [49:30] a finished treatment to match the [49:32] building. [49:40] » Um so for the applicant what we are [49:44] asking is the code states that the [49:47] materials of a monument should reflect [49:50] the materials on the building as well. [49:53] So, since the building has whitewashed [49:56] or white painted brick, we're asking if [49:59] you would be willing to paint the [50:01] monument prior to um your application of [50:04] these sign letters so that the monument [50:07] does indeed match the materials of the [50:10] building. [50:10] » Yeah, no problem. You want to uh I need [50:14] painting like a stellar. Is this [50:16] monument same color to the building? [50:19] » Yes. Yes. No problem. [50:31] » Yep. [50:32] » Could I see the sample better again? [50:35] [clears throat] [50:36] » I'm a little confused how this thing [50:37] where it gets wired into. [50:40] » I just making sure that the I guess you [50:43] call it serif. [50:43] » It's very light. [50:44] » Yeah, it's all all in there. So [50:56] Are is your building sign [51:00] every letter attached to the building? [51:03] Every letter is attached to the building [51:04] or is it on a bar behind it that they're [51:06] attached on? [51:09] » Uh every [51:12] letter like this. [51:13] » Okay. So you will use those connections. [51:17] Okay. [51:37] » Okay. So, we'll need two separate [51:39] motions, one for the building and one [51:41] for the monument. Um [51:43] » I have I do have one one more uh comment [51:46] to make. Um [51:48] the lighting [51:51] not not the not this lighting but the [51:55] lighting on the building and the sign [51:56] lighting. Um we want to make sure that's [51:59] not overdone, not excessively bright. Um [52:05] » No [52:06] » I mean it's not on the [52:08] » We're not approving that light. [52:09] » Oh okay. We're not approving it. Okay. [52:10] We've already Okay. Sorry, we're not [52:12] focused on something else. Okay, great. [52:13] Awesome. Thank you. That takes care of [52:14] me. [52:15] » Okay. [52:16] » I was curious about that. I mean, it [52:17] doesn't look bad, but there's no specs [52:19] on it that there's no drawings on it. [52:20] » No, that's I was I was just getting [52:21] nervous that if we approved a light that [52:22] we have, [52:24] » It could be the wrong color. And the [52:26] advertised as building and monument sign [52:29] me. [52:30] » And I'll make it clear to the applicants [52:32] to not [52:33] » Yeah. No. Yeah. No lighting. [52:35] » If they want lighting, they just have to [52:36] bring it back. [52:37] » Correct. Correct. detail about the color [52:40] and the intensity and all that stuff. [52:42] » Definitely. [52:42] » Cool. [52:43] » We may. [52:44] » All right. So, would someone care to try [52:47] their hand at item five, the building [52:49] sign? [52:51] » I make a motion to approve item five, [52:53] the building sign based on the example [52:57] brought for the signage only, not the [53:00] lighting. [53:05] » Sorry. [53:08] Right. [53:10] » I motion to approve the signage for our [53:13] item for Euro Market 30A for the signage [53:17] only, not the lighting. [53:21] » Building sign and monument sign. [53:23] Correct. [53:24] » Just building. Sorry, my bad. [53:26] » Since there's no detail, maybe explain [53:28] it as the black um aluminum [53:32] » Black LED lit letters individually. [53:36] I motion to approve that. [53:41] » We have a motion and a second. All in [53:44] favor? [53:44] » I. [53:46] » Okay. [53:46] » Item six, the monument sign. [53:51] » I'll make a motion to approve item [53:53] number six, your market 38 monument [53:55] sign. [53:57] with the caveat that we whitewash or [54:01] make the brick white to match the [54:03] building in in color in some form to [54:06] bring the design together there. The [54:09] letters may be lit in halo dome lit and [54:13] the address may be also lit. [54:17] No other additional lighting to be added [54:19] to that monument sign. [54:23] » Okay, we have a motion. [54:25] » Second. [54:25] » Second. All in favor? I [54:27] » I [54:28] » All right. And we are approved on both [54:31] five and six. [54:33] » Thank you. [54:33] » Thank you. [54:34] » And um additional business. [54:38] » I know you wanted to bring something up [54:43] the sidewalk in [54:46] » Yeah, that was a happy thing to see on [54:47] the plan, wasn't it? It was [54:49] » I feel like it goes back to the original [54:51] master plan is where that's coming from. [54:53] I think it just keeps getting copied [54:54] over. Well, no, I understand. Thank you. [54:59] [laughter] [55:00] » Yeah, welcome. [55:00] » We look forward to it. [55:02] » Um, yeah, I just, you know, I'd like to [55:04] see the codes of applied um and I do see [55:08] people I saw some people on the way to [55:10] this meeting uh riding bicycles um on [55:13] the there is a little section of bike [55:15] lane on on uh 98 right there, [55:18] » But uh they would be a lot more [55:19] comfortable. Well, there's a lot of [55:20] pedestrians in that area going from the [55:22] apartments coming from south of 98 and [55:25] they're moving on that roadway. I think [55:27] we require sidewalks of other [55:30] developments. I think we should require [55:32] it of this one. [55:33] » Do do we have any idea of where FDOT is [55:35] at with this and that's probably more of [55:37] a question for Tim. [55:38] » They're years away from the actual [55:39] installation. They're still in in the [55:41] they're at the end of the PD&E study and [55:43] they've just selected the engineers to [55:45] begin designing. I heard the next [55:47] segment would be from 38 to 3:31, [55:51] » Right? [55:51] » So, it's going to be some time before [55:53] they eventually it'll get widened, but [55:56] no time soon. [55:57] » Yeah. [55:57] » So, David, you would like to see St. Joe [56:00] go ahead and front the bell to put a [56:01] sidewalk in and not wait on FDOT to [56:04] finish. [56:04] » Yeah. Now, is it possible that they did [56:06] a payment in L or something for that? [56:08] Uh, [56:10] » I mean they showed it in their drawing. [56:12] So, [56:12] » But doubtful. Um, [56:15] typically we don't allow that on 98 [56:18] because we want a continuous sidewalk. [56:21] » I haven't really been involved with [56:23] origins. So, I don't know. I mean, the [56:26] code absolutely says a sidewalk is [56:29] required. Why it hasn't been built yet. [56:32] They may have some arrangement that they [56:34] don't have to do it until a certain [56:36] amount of development. Well, they [56:37] haven't other people other people don't. [56:40] Yeah, that's where I'm going is and as [56:41] you heard, I'm getting increasingly [56:44] frustrated [56:45] » With St. Joe. They're very They're very [56:48] They press us very hard. You got to [56:49] approve this. You we got to do this now. [56:51] And then when we ask for something [56:54] » Yes, they they definitely pressed hard. [56:57] » It's like they'll say, "Well, this [56:58] isn't, you know, it's not real road [57:00] frontage. The building's set back." [57:02] » Yeah. Yeah. Yeah. We can't We can't We [57:03] got to ask road frontage there. [57:05] » Yeah. We're not sure if FDOT will let us [57:07] move this piece of driveway, but we got [57:09] them to move an entire highway one time, [57:11] right? So, uh I don't I don't buy it. [57:14] And you know, we represent the community [57:16] and I'm here to say I'm getting [57:17] frustrated with St. Joe's attitude and [57:20] they're on the way to build a whole lot [57:21] of stuff. And as I pointed out, I could [57:24] have very easily said, I don't see the [57:25] sidewalk. Your packet shows a sidewalk. [57:27] You said it's not going to be in the [57:28] project. Motion to deny. [57:30] » And I would been perfectly justified in [57:32] doing that. [57:33] What's the hold up on the fire station? [57:36] » They [57:38] Yeah, this so we have to cross flour and [57:42] lights [57:44] » Easement [57:44] » Easement [57:45] » And [57:47] um St. Joe is concerned that the [57:52] easement that will be a temporary [57:54] construction road easement is going to [57:56] somehow [57:58] cause them a problem because we have to [58:00] get an easement across their property to [58:02] get to the site that we negotiated and [58:06] and have in good faith purchased from [58:08] them. [58:10] » It has been seven years since the [58:12] conversation about this started. [58:13] » That's the same thing over by Mac [58:15] Valley. [58:15] » Yeah. [58:16] » Easement issue over there. They they [58:18] keep falling back on, well, Florida [58:20] Power and Lights got to think about it. [58:21] If St. Joe would just say, "Look, we'll [58:24] figure this all out. We're getting ready [58:26] to try to build a at least 11.5 million [58:29] fire station." And again, we're [58:31] investing. We've bought millions of [58:33] dollars worth a ladder truck to give you [58:35] an idea cost $2.3 million. We've [58:38] purchased that thinking we were going to [58:40] have a fire station to put it in. And um [58:44] we without falling down a rabbit hole, I [58:47] just again the pattern I'm seeing with [58:49] St. Joe is when we make it when the [58:51] community makes an ask of them, they're [58:53] very very slow to respond. When they [58:56] want something, they expect us to wave [58:59] this irregularity, I mean, bringing a [59:02] set of drawings that have a PVC membrane [59:04] roof relabeled as standing seam, that's [59:06] ridiculous. [59:08] » Yeah. Uh, so I just I'm just going to [59:11] use this opportunity to put some [59:13] pressure on them. [59:14] » And again, I see a sidewalk drawn that [59:16] everybody else has had to build. Why [59:18] don't they have to build it? [59:20] » Yeah, I don't have the answer. All I can [59:22] tell you is the code absolutely requires [59:24] a sidewalk on Highway 98. [59:25] » And I'm sure it's on all of their [59:27] drawings, all of the civil drawings. [59:28] That's what I'm saying. It just gets [59:29] copied over. [59:30] » And I get internally, well, that's not [59:32] my problem. That's private property. [59:33] They they put that there if they want it [59:34] there. Um, uh, the sidewalk on 98 is a [59:37] community asset that they're supposed to [59:39] provide. And they told us, "We've got [59:41] all this frontage. You ought to let us [59:43] do this non-compliant sign. Give us a [59:45] variance." You know, and we were like, [59:47] "Oh, yeah, sure. No problem." U, I just, [59:50] you know, you got all that frontage, put [59:52] a sidewalk on it. [59:54] » So, there's a lot of frontage there. [59:56] » Yeah, [59:59] » That's the end of my rant, but um, [1:00:01] » Maybe if staff could respond back. Um, [1:00:04] well, that's that's on the south side. [1:00:06] » Yeah. Who put that in the county, state? [1:00:09] » That's a good question. [1:00:10] » Combination. [1:00:11] » Okay. [1:00:11] » Combination of funds. [1:00:13] » I do agree. I mean, there's so much more [1:00:15] pedestrian and bike traffic, bicycle [1:00:17] traffic, than there used to be. I mean, [1:00:18] just 10 years ago, you didn't used to [1:00:20] see tons of people on the side of the [1:00:22] road. But with all the hidden runs and [1:00:24] the accidents on 98, [1:00:25] » I think. [1:00:27] » Yeah. We first started talking about [1:00:29] this in 2021. And I still have meeting [1:00:32] minutes from a meeting with Chase about [1:00:34] these sidewalks and the 10-year plan. I [1:00:36] mean, he didn't call it a 10ear plan. I [1:00:38] did [1:00:38] » Because now we're five, six years into [1:00:40] it. It's still progressing, right? [1:00:43] » And yeah, St. Joe holds a lot of a lot [1:00:45] of sway in different areas down on down [1:00:47] in that way. So, I understand your [1:00:48] frustration. I'm on the other end of [1:00:50] town on the Mac Valley side, but it's [1:00:51] been just frustrating for us. It's a [1:00:52] very long process. [1:00:54] » Yeah. And and I made the joke about [1:00:56] Florida Power and Light because they are [1:00:58] always at the tip of the iceberg with [1:00:59] these easements and until you get [1:01:01] lawyers involved, nothing ever gets [1:01:02] done. [1:01:03] » Yeah. [1:01:04] » So, [1:01:05] » Anyway, [1:01:05] » Yeah, my understanding was is that uh [1:01:08] Florida Power was much more cooperative [1:01:11] than FPL. [1:01:13] » You mean Golf Power? [1:01:14] » Yeah. Oh, Golf Power. [1:01:15] » Golf Power was fantastic. When Florida [1:01:17] Power and Light came in, what did I say? [1:01:18] » You said Power Golf Power. They were [1:01:21] much more um [1:01:22] » Southern company. They're very very [1:01:24] engaged in their communities and uh [1:01:27] » Florida Power and Light is [1:01:29] » I had I have I had golf power till it [1:01:31] became FPL. [1:01:32] » We are [1:01:33] » The problem on this particular [1:01:34] » And they raised our rates 25%. [1:01:35] » It would be nice if staff could figure [1:01:37] it out. Um [1:01:39] » Give us a report at our next meeting. [1:01:40] » I don't know where it is. I'll try, but [1:01:43] you know, Renee did all of that and when [1:01:47] she left, [1:01:48] » Rosanna did all and you know, neither [1:01:50] one of them are here now. So, [1:01:52] » I guess again I was my attempt was to [1:01:54] try to give and that's why um [1:01:57] » Catherine [1:01:58] » Katherine I thought I recognized her. [1:02:00] » Um it I went to them to get the message. [1:02:04] I'm not kidding. The next item they [1:02:06] bring to this board, I will I will hold [1:02:10] it up over whatever deficiency I can [1:02:12] find in their drawings. [1:02:14] » Yeah, they wanted to come this to come [1:02:15] immediately to the meeting. I cut them [1:02:17] some slack. [1:02:19] » Really? It should have went next month. [1:02:22] » They should have corrected the drawings [1:02:23] and brought it next month. Yeah, [1:02:24] » But they were [1:02:25] » Anyway next time again [1:02:27] » Insistent on getting on this meeting. So [1:02:29] I'm like, okay, fine. [1:02:32] » Okay. Well, they got money tied up. [1:02:35] » That's why. [snorts] [1:02:37] » But it would it would be nice to know if [1:02:40] if fees were paid or if they have a [1:02:43] trigger somewhere in their plans of when [1:02:45] that will get constructed. [1:02:46] » Well, it's certainly possible, but I [1:02:48] kind of doubt we would let them buy it [1:02:49] out. [1:02:50] » Well, I mean, it it's obviously shown [1:02:52] somewhere in the civil package or it [1:02:53] would not have shown up on their [1:02:56] drawings. [1:02:56] » Yeah. [1:02:57] » Because a lot of that is from the master [1:02:59] plan, correct? I mean, most of what he [1:03:02] shows on his drawing is from the master [1:03:04] plan. [1:03:05] » No, absolutely. And and I mean, that's [1:03:07] where it lives, you know. It's not They [1:03:09] don't generate a new drawing set every [1:03:11] time. I mean, that's [1:03:13] » The You're just xing in. [1:03:15] » I'll see what I can find out. Um there's [1:03:19] a lot of dos there. So, [1:03:21] » I mean, at some point, the sidewalk [1:03:22] needs to be built, right? So who does it [1:03:25] like it's supposed to be a part of their [1:03:27] development and yet we keep approving [1:03:29] all the things for them to build without [1:03:31] » Sometimes [1:03:32] » The public amenity [1:03:33] » The developer will [1:03:36] » Get an agreement with the county like [1:03:39] Alice speech they had an agreement with [1:03:40] their proportionate fair share so they [1:03:43] didn't have to pay it all up front they [1:03:45] paid it over like seven years or [1:03:47] something till it was paid off now it's [1:03:50] paid off [1:03:52] » But Um, I don't know that that happened, [1:03:54] but I'm just saying sometimes the [1:03:56] developer will get an an agreement [1:03:59] between them and the county approved to [1:04:04] delay or what you know like typically [1:04:07] you pay the proportion of fair share all [1:04:08] upfront [1:04:09] » Or or there's a trigger written in when [1:04:12] a certain percentage of the development [1:04:13] » Of the devel right [1:04:16] we've worked on smaller developments [1:04:17] where the county we're required because [1:04:19] the sidewalks get destroyed during [1:04:21] construction. Y [1:04:22] » The developer has to put forth a bond. [1:04:24] » Yeah. [1:04:24] » For that. [1:04:25] » Well, it's a letter of credit, but yeah, [1:04:27] because [1:04:28] » Yeah. [1:04:28] » That's one of the last basically [1:04:30] sidewalks and landscaping is the last [1:04:32] thing they want to do because it'll get [1:04:34] all torn up. [1:04:36] » Sidewalks. If you notice Camp Creek, [1:04:38] that whole master plan shows sidewalks [1:04:41] at the development. They told me they [1:04:43] put have no intention to put in the [1:04:45] sidewalks because I was, you know, when [1:04:47] I was designing the house in there, I [1:04:49] said I called them because I said it [1:04:51] shows that this owner, every owner has [1:04:53] to put in their [1:04:55] » Four foot sidewalk from property line to [1:04:57] property line. I said I just drove [1:04:59] through the development and there's none [1:05:00] of them. They said, "Oh yeah, we gave up [1:05:01] on this." [laughter] [1:05:03] » So So there are no development or there [1:05:06] are no sidewalks in Camp Creek. I'm [1:05:08] surprised that uh that wasn't picked up [1:05:11] by the BPR folks. [1:05:13] » I'm not [1:05:14] » Because they're looking at they should [1:05:16] be looking at the master plan. [1:05:20] » Is it possible to give developers [1:05:22] deadlines for completing certain [1:05:24] projects that if they're consistently [1:05:26] showing a sidewalk on every plan for [1:05:28] seven years that doesn't ever exist? [1:05:30] » I'm just going to I'm going to use the [1:05:32] same strategy. [1:05:33] » Original developer site plan has those [1:05:35] triggers built in. Like you said, [1:05:36] there's a letter of credit, there's a [1:05:37] bond, there's a note somewhere that says [1:05:39] this is going to be built with this [1:05:41] parcel development, [1:05:42] » Right? [1:05:42] » There's that data is required somewhere [1:05:46] » On a certain percentage of buildouts. [1:05:47] She's saying when you get to 60% [1:05:49] » That way the county if the developer [1:05:51] doesn't do it, the whole idea of we [1:05:53] don't take bonds anymore. It's a letter [1:05:55] of credit. The whole idea is if the [1:05:59] developer goes bankrupt or whatever, the [1:06:02] county will take that money and put in [1:06:04] the sidewalks or landscaping or [1:06:06] whatever. [1:06:07] » There should be um that should be part [1:06:10] of their their sign off [1:06:11] » And they have to provide that before we [1:06:14] allow them to plat it, right? [1:06:17] And typically we get those two things, [1:06:20] landscaping and sidewalks, because if [1:06:23] they put it in up front, they tend to [1:06:25] get torn up. So they'll give us a letter [1:06:27] of credit, and that's basically the last [1:06:30] thing they'll put in and and and [1:06:34] you know, they have to have the DO [1:06:35] inspector's final sign off that these [1:06:38] things are in before they can plat the [1:06:42] project. But to to the board's point, [1:06:46] like it could take them 20 years to [1:06:48] finalize all this project. [1:06:49] » Yeah. [1:06:50] » So David's saying, why do why does the [1:06:52] community have to wait 20 years? [1:06:53] » They're not driving they're not driving [1:06:54] trucks across this anymore. They've [1:06:56] landscaped everything around it. Um [1:06:59] » Again, it's um [1:07:01] » They just don't want to pay for, [1:07:02] » You know, next time they come to this [1:07:04] board. That's a possibility as well that [1:07:06] they have to [1:07:07] » I'm sure I can find something wrong with [1:07:08] their application and we'll [1:07:11] » I'm just letting you know what I'm going [1:07:12] to do. [1:07:14] » Well, I feel you. I mean, they certainly [1:07:16] they certainly pressure us to, you know, [1:07:18] get this stuff moved forward as quickly [1:07:21] as possible. [1:07:21] » Well, there's a there's a record. [1:07:22] There's a paper trail somewhere and I [1:07:24] think that it would be advantageous to [1:07:28] find it. [1:07:28] » Go back to 08. I would like to add to [1:07:31] the record [1:07:34] LDC section 5.04.03 [1:07:41] pointH sidewalks. That might answer some [1:07:45] of the questions that you have about [1:07:47] sidewalks and buyouts. [1:07:49] » Okay. [1:07:50] » The county. [1:07:51] » Well, I mean basically that just says [1:07:52] you have to do it. [1:07:54] » Yeah. But this was this was approved [1:07:56] what 18 years ago? I think it goes a [1:07:58] little bit deeper than that. [1:08:00] » So, [1:08:01] » Okay. [1:08:01] » I don't know what the code was when they [1:08:02] when they [1:08:03] » Now, this is a rule section of Highway [1:08:05] 98. And if DOT keeps it a rule section, [1:08:09] they typically won't put in a bike lane, [1:08:13] which of course if you're using DOT's [1:08:15] bike lane, you're taking your own life [1:08:16] in your life in your own hands. [1:08:19] » Can you rattle that section off again? [1:08:21] But um [1:08:23] typically they put in a sidewalk and [1:08:25] they put a bike lane, but it has to be [1:08:26] an urban section, not a rural section. [1:08:31] » It's in chapter 5 of the land [1:08:33] development code 5.04.03.H [1:08:38] and the subsection title is sidewalks. [1:08:41] » Sidewalks. Okay. But that would only be [1:08:43] applicable [1:08:45] for it wouldn't necessarily hold the [1:08:47] vesting from [1:08:48] » From that particular project master [1:08:51] plan. [1:08:52] » Yeah. [1:08:52] » No, but it talks about where they're [1:08:54] required, [1:08:55] » Buying them out, exempting them. [1:08:58] » Because it has to be in a rural area for [1:09:00] exemptions. So we [1:09:02] » At the end of the day, they're showing [1:09:03] it on a plan set, which means it's in a [1:09:05] plan set [1:09:06] » Somewhere. Yeah. somewhere [1:09:07] » Because they're using the same base [1:09:10] every time they print out something for [1:09:12] water. It's the exact same CAD base. [1:09:15] » Yeah. [1:09:15] » So, it's in their file, which means it's [1:09:18] on a drawing somewhere. [1:09:21] » I agree. [1:09:22] » Which means it was [1:09:24] » Somewhere. It's somewhere. [1:09:25] » But just so you know, [1:09:27] » You can only exempt a sidewalk in rural [1:09:29] areas. And we've made the planning has [1:09:32] made the determination that there's [1:09:33] nothing rural in South Walton. If it was [1:09:36] if it was exempted, it wouldn't be [1:09:38] showing up in his C. [1:09:39] » No, I'm just saying we're talking about [1:09:41] sidewalks. There's a provision in the [1:09:44] code for them to be exempted, but that's [1:09:46] in rural areas, and we we're the [1:09:49] planning department is saying there are [1:09:51] no rural areas in South Walton. [1:09:53] » Yeah. [1:09:54] » There hasn't been for a really long [1:09:55] time. [1:09:56] » No, I get it. All right. Um well, thank [1:09:58] you all [1:09:59] » And um Karen, next month we're here. [1:10:02] » Yes. All right. Thank you very much. And [1:10:07] we're darned calling it. [1:10:29] Chase.