1 00:00:04,820 --> 00:00:28,340 This work session of the Westland City Council. It is Tuesday, October 21, 2025, 603 P.M., got a nice full agenda tonight with several council priorities and projects of importance to the community and the city on our agenda. So we'll get right into it. First item is just to approve the agenda. So I would entertain a motion. 2 00:00:29,440 --> 00:00:38,360 Thank you, Mayor. I move to approve the agenda for the Tuesday October 21st, 2025 Westland City Council 3 00:00:38,360 --> 00:00:39,280 Work session. 4 00:00:39,880 --> 00:00:40,100 Second. 5 00:00:40,940 --> 00:00:45,420 Okay, it's been moved in second to approve the agenda for the October 21st, 2025 City Council 6 00:00:45,420 --> 00:00:46,340 Work session. 7 00:00:47,600 --> 00:00:49,140 Any discussion from the council? 8 00:00:51,180 --> 00:00:51,980 Okay, seeing none. 9 00:00:52,180 --> 00:00:52,820 Call the roll, please. 10 00:00:52,960 --> 00:00:53,880 Kathy, thank you. 11 00:00:54,620 --> 00:00:55,100 Yes. 12 00:00:56,320 --> 00:00:56,800 Yes. 13 00:00:57,120 --> 00:00:57,160 Yes. 14 00:00:57,160 --> 00:00:57,280 Yes. 15 00:00:57,280 --> 00:00:59,480 On the right. 16 00:00:59,820 --> 00:01:00,120 Yes. 17 00:01:01,540 --> 00:01:02,860 So the agenda passes. 18 00:01:03,180 --> 00:01:05,440 And that's the last time we'll have to call the roll tonight, Kathy. 19 00:01:06,580 --> 00:01:07,960 Why it night in a work session? 20 00:01:10,060 --> 00:01:15,040 So that takes us to public comments for items not on the agenda or some folks may wish 21 00:01:15,040 --> 00:01:16,960 to go early. 22 00:01:18,540 --> 00:01:19,480 Rebecca Hounder? 23 00:01:22,850 --> 00:01:23,450 Welcome, Rebecca. 24 00:01:25,190 --> 00:01:29,150 And I think I see a plaque there, and I have to give you an early congratulations. 25 00:01:31,190 --> 00:01:31,950 Just to... 26 00:01:33,320 --> 00:01:35,040 I haven't spoiled my thunder last week. 27 00:01:36,540 --> 00:01:40,900 So, I work back to Holland back at the Executive Director of Historical Amment Mainstreet. 28 00:01:42,020 --> 00:01:47,140 And I am here tonight to thank the City full-heartedly from our organization 29 00:01:47,140 --> 00:01:50,060 for their partnership over the many years. 30 00:01:50,060 --> 00:01:54,940 And specifically the work that we did together on the Street Skate Project. 31 00:01:55,680 --> 00:02:04,100 I put in and award and we were chosen out of others throughout the state with an excellence on Maine award. 32 00:02:04,560 --> 00:02:05,260 So this is it. 33 00:02:05,300 --> 00:02:08,380 I will bring it and share it with you guys up there. 34 00:02:09,700 --> 00:02:11,220 And so that was a pretty big deal. 35 00:02:11,800 --> 00:02:20,040 And we have a couple of staff members that came, Luke and Eric, Kevin came and we had quite a few of our board members came down. 36 00:02:20,040 --> 00:02:25,360 for the award. So it was a big deal. They were joking that we had half of the people in the audience. 37 00:02:25,540 --> 00:02:31,420 It was not true, but that was kind of the running joke. So anyway, so that was great. 38 00:02:31,500 --> 00:02:36,900 And I just want to thank you. And I told John last week maybe we can like trade it off every month or something. 39 00:02:37,960 --> 00:02:42,880 I'll have it at each location. But I'll pass it up so you guys can actually take a look at it. 40 00:02:42,880 --> 00:02:46,480 I know Kevin showed you a picture of it last week. So. 41 00:02:46,480 --> 00:03:04,360 Outside of that, I also want to just let everybody know that we do have our Halloween event coming up on Halloween from three to six and as always, we ask City Council if you're available to come down and hand out candy to the kids in front of her office. 42 00:03:04,360 --> 00:03:06,740 So we have a lot going on down there. 43 00:03:06,920 --> 00:03:09,520 I know that's a really big day because it's also 44 00:03:09,520 --> 00:03:10,440 a rivalry day. 45 00:03:11,060 --> 00:03:13,680 And so there's a lot happening that day. 46 00:03:14,940 --> 00:03:18,120 And then I also just wanted to say that I'm very excited 47 00:03:18,120 --> 00:03:21,640 to say that we have finally joined OEDO, which 48 00:03:21,640 --> 00:03:24,100 is the work in economic development association. 49 00:03:24,820 --> 00:03:27,080 And I am actually going to be attending their conference 50 00:03:27,080 --> 00:03:28,600 for the first time this weekend. 51 00:03:29,400 --> 00:03:31,780 So I hope to bring back a lot of good information 52 00:03:31,780 --> 00:03:34,660 that we can use throughout the city from that. 53 00:03:37,740 --> 00:03:40,860 Thank you so much for being here and thank you for all your work and 54 00:03:41,860 --> 00:03:43,200 a main street. 55 00:03:43,560 --> 00:03:44,640 Should we take a picture? 56 00:03:44,820 --> 00:03:46,900 Would you like to take a picture with the city council in the 57 00:03:46,900 --> 00:03:47,300 plaque? 58 00:03:47,320 --> 00:03:47,600 Yes. 59 00:03:47,860 --> 00:03:48,780 We can let's do that. 60 00:03:48,940 --> 00:03:49,680 Let's get another picture. 61 00:03:55,790 --> 00:03:57,390 And any board members with historical 62 00:03:57,390 --> 00:03:59,090 Can you come up? 63 00:05:27,930 --> 00:05:28,330 Okay. 64 00:05:42,500 --> 00:05:44,700 Thank you, Ken. We 65 00:05:47,260 --> 00:05:56,140 can move on to the next speaker. The rest of them are here for the 66 00:05:56,140 --> 00:06:01,600 She can't take me from the audience and wanted to speak during this topic because she can't stay for the whole meeting 67 00:06:02,180 --> 00:06:03,880 You would you like to speak now? 68 00:06:04,200 --> 00:06:08,960 Okay, for everyone who speaks tonight, just come on up. 69 00:06:09,200 --> 00:06:09,280 Yes. 70 00:06:09,280 --> 00:06:15,800 She's a green light is on and you're going to want your mouth really close to the microphones that folks in the room can hear you. 71 00:06:16,560 --> 00:06:16,760 Welcome. 72 00:06:17,020 --> 00:06:21,000 Just state your name and city residents and you have three minutes if you need to go a little bit over you're welcome to. 73 00:06:21,200 --> 00:06:21,880 Okay, thank you. 74 00:06:22,140 --> 00:06:24,460 Nicole Jackson, resident of Westland. 75 00:06:25,100 --> 00:06:27,520 I am here, good evening counselors. 76 00:06:27,820 --> 00:06:32,660 I am here to speak on behalf of Friends of the Lament Wetlands tonight in relation to 77 00:06:32,660 --> 00:06:38,060 the Waterfront Vision Plan unfortunately I can't stay for that agenda topic and I wasn't 78 00:06:38,060 --> 00:06:41,740 able to attend the last work session by wanted to share some concerns that I'm still 79 00:06:41,740 --> 00:06:43,720 seeing on the draft of agenda. 80 00:06:44,600 --> 00:06:49,360 So back in January of last year, Friends of the Lament Wetlands submitted some comments 81 00:06:49,360 --> 00:06:55,260 concerns about the vision plan, they weren't unfortunately shared in totality with the working group 82 00:06:55,260 --> 00:06:59,960 and so this is kind of continue to go on for longer than I would hope. I would hope that, you know, 83 00:07:00,000 --> 00:07:05,780 we could get this kind of address and resolve to move forward. I wish I didn't need to reiterate these 84 00:07:05,780 --> 00:07:11,580 concerns, but it appears that the draft to changes on the agenda tonight tonight do not fully 85 00:07:11,580 --> 00:07:18,840 reflect the concerns that myself and other community members have shared both at the last work 86 00:07:18,840 --> 00:07:24,180 session and at the Planning Commission hearing in September, I want to also acknowledge 87 00:07:24,180 --> 00:07:29,240 Russ Axelrod's testimony and Terence Schumacher's testimony that was submitted for tonight. 88 00:07:29,540 --> 00:07:31,720 They cannot be in attendance in person. 89 00:07:32,940 --> 00:07:38,360 The resounding community feedback was to preserve the wetlands that cited in the community 90 00:07:38,360 --> 00:07:41,540 engagement summary and appendix A for the Pond District. 91 00:07:42,260 --> 00:07:51,540 It's also been amplified by our petition with over 3,850 signatures from community members who really want to see that area preserved. 92 00:07:52,320 --> 00:07:56,580 And this is, as has been mentioned, multiple times a community vision plan. 93 00:07:57,600 --> 00:08:02,560 So while I did see and we saw that medium density residential was removed from the map. 94 00:08:02,960 --> 00:08:08,880 There still is a potential development area that is highlighted in yellow, south of Fifth Avenue next to the wetlands. 95 00:08:10,760 --> 00:08:14,560 And I feel like it's not what we were hoping for. 96 00:08:15,320 --> 00:08:18,280 There's a lot of constraints with that property in that area. 97 00:08:18,820 --> 00:08:20,560 And if it's a community plan, 98 00:08:21,020 --> 00:08:23,880 it should reflect what the community envisions for that area. 99 00:08:24,940 --> 00:08:30,700 And so keeping that potential development areas sort of feels like an endorsement of development 100 00:08:30,700 --> 00:08:36,740 when there's so many constraints that exist with that property, including floodplain, earth quakes, 101 00:08:36,740 --> 00:08:43,520 Steve Slopes, the required Wetland Buffer, the Title 3 and Title 13 Habitat Area. 102 00:08:44,840 --> 00:08:51,160 It's been pretty clear that we don't want to see development in this area and that doesn't prevent the property owner. 103 00:08:51,400 --> 00:08:53,300 I understand property owner rights. 104 00:08:54,300 --> 00:08:59,080 Removing it from the vision plant doesn't prevent him from attempting to or pursuing potential development, 105 00:08:59,260 --> 00:09:03,420 but it just shows that you are listening to the overwhelming community feedback 106 00:09:03,420 --> 00:09:11,780 When we say we don't want to see development, highlighting development in that area, kind of feels like ignoring the resounding feedback. 107 00:09:12,540 --> 00:09:19,040 So, sorry for rambling there a little bit. I'm happy to answer any questions if you have any, or clarify any concerns. 108 00:09:19,780 --> 00:09:25,580 But I really appreciate you listening to my concerns and other community members concerns on this issue. 109 00:09:27,500 --> 00:09:28,480 Thank you for your comments. 110 00:09:28,480 --> 00:09:30,000 Thank you. 111 00:09:30,020 --> 00:09:30,480 Thank you. 112 00:09:30,920 --> 00:09:36,040 We will discuss the map and issues with the waterfront plan a little bit later in the 113 00:09:36,040 --> 00:09:39,080 agenda, but we plan to talk about that if you watch later. 114 00:09:40,180 --> 00:09:40,960 Thank you. 115 00:09:40,960 --> 00:09:41,440 Thank you. 116 00:09:41,460 --> 00:09:42,680 Thanks for your continued engagement. 117 00:09:48,300 --> 00:09:56,260 Well, that takes us to Mayor and Council reports reports from community advisory groups or city 118 00:09:56,260 --> 00:09:57,800 business in general. 119 00:10:01,210 --> 00:10:24,310 Councillor Bonneton can kick us off today. I and Cowell both attended the fall fest at Marius Young on Saturday, and that was really quite well attended, traffic all the way out of the park at one point, and it was a really lovely time, so thank you to parts for putting that on yet again. 120 00:10:26,200 --> 00:10:27,540 Thank you, Councillor. 121 00:10:28,760 --> 00:10:32,720 So you confessing you are a cowl of the owl at the absolutely not number. 122 00:10:34,840 --> 00:10:35,100 Thanks. 123 00:10:35,100 --> 00:10:36,040 Thanks for attending that. 124 00:10:36,160 --> 00:10:37,260 It looked like a great community event. 125 00:10:37,580 --> 00:10:41,100 Of course, thanks to the Parks Department for all their work in putting that on. 126 00:10:41,580 --> 00:10:43,720 I know Director Big John's back there. 127 00:10:43,720 --> 00:10:48,200 Pass along our regards for that wonderful event to the staff. 128 00:10:48,560 --> 00:10:49,440 Councillor Groner? 129 00:10:50,920 --> 00:10:51,200 Yes. 130 00:10:51,200 --> 00:10:58,740 So the Sustainability Advisory Board rep on October 16th, they summarized the parametric 131 00:10:58,740 --> 00:11:03,600 report and kind of some feedback from their appearance before the council here. 132 00:11:04,220 --> 00:11:06,160 They're working on their annual report. 133 00:11:08,160 --> 00:11:14,580 There's some discussion about maybe charging stations, and I kind of volunteer to try to talk 134 00:11:14,580 --> 00:11:15,820 to ROSC. 135 00:11:15,840 --> 00:11:21,100 I don't know if I'm stepping on anybody else's toes here, but apparently they own the Walmart 136 00:11:21,100 --> 00:11:26,380 Center as well as the Safeway Center and they're the people to talk to if it's going to get 137 00:11:26,940 --> 00:11:30,340 electrified. So far I have not gotten the response from them. 138 00:11:32,480 --> 00:11:33,300 That's about it. 139 00:11:34,120 --> 00:11:36,760 I sounds good and I'm happy to help with that too. 140 00:11:37,020 --> 00:11:40,600 You should try to reach out to RRO I see in the past two minutes. 141 00:11:40,600 --> 00:11:43,360 I couldn't get a meeting scheduled in the past. 142 00:11:43,640 --> 00:11:45,100 Yeah, we'll work on that. 143 00:11:45,700 --> 00:11:50,940 Oh, Chris Myers, planner Myers, you're unmuted, there's on there. 144 00:11:51,400 --> 00:11:51,920 Welcome, Chris. 145 00:11:52,700 --> 00:11:54,040 You're all good. 146 00:11:55,400 --> 00:11:55,900 Hi, Chris. 147 00:11:57,040 --> 00:11:59,800 Was taught well, hear from you a little bit later on Vision 43. 148 00:12:00,040 --> 00:12:02,380 We look forward to that. 149 00:12:02,700 --> 00:12:05,080 Councillor President Vonger, do you have anything to report tonight? 150 00:12:06,100 --> 00:12:06,700 Thank you, Mayor. 151 00:12:06,900 --> 00:12:07,340 Yes. 152 00:12:08,560 --> 00:12:14,820 I attended both the William Appalza Landings Heritage Area Coalition Board meeting yesterday morning. 153 00:12:14,820 --> 00:12:19,720 and the Lime Opulse Trust board meeting in the afternoon. 154 00:12:20,960 --> 00:12:30,700 And the exciting things are happening, especially with the potential of fundraising for the trust. 155 00:12:31,640 --> 00:12:40,600 And the Lime Opulse Trust staff will be moving into the historic city hall building and join 156 00:12:40,600 --> 00:12:52,640 and the locs authority offices, and of course the Heritage Area Coalition already is their staff is in the building, so all three groups will be there working together. 157 00:12:52,640 --> 00:13:08,740 And I believe the Heritage Advocates will also be, so it's going to be a great meeting of the minds. So I'm excited for that. And of course we just came from our Metro Mixer, which is an opportunity to meet and talk to Metro staff. 158 00:13:08,740 --> 00:13:18,100 and convince them how what a good project we are to fund in various ways and also just 159 00:13:18,100 --> 00:13:23,540 meet with our local area elected, so that was a great opportunity. 160 00:13:24,780 --> 00:13:26,100 That's it. 161 00:13:26,440 --> 00:13:29,420 Thank you, Councillor President, Councillor Brack. 162 00:13:30,280 --> 00:13:30,900 Thank you, Mayor. 163 00:13:30,960 --> 00:13:34,020 I attended the Planning Commission meeting last Wednesday. 164 00:13:34,020 --> 00:13:40,000 the Planning Commission reviewed and approved the Metro Town Center boundaries. 165 00:13:40,540 --> 00:13:44,860 There have been some slight adjustments on those, and I believe we'll be coming to Council. 166 00:13:46,600 --> 00:13:51,440 Thank you. I also attended the Metro Mixer and on Sunday got to host a group of 167 00:13:51,440 --> 00:13:56,300 Western students from the Youngman's service lake here at City Hall and gave them a tour 168 00:13:56,300 --> 00:13:59,240 and have a talk so they could get there. 169 00:13:59,240 --> 00:14:05,740 They were having a certification and government as part of their group that there was. 170 00:14:05,800 --> 00:14:06,540 So that was very fun. 171 00:14:06,640 --> 00:14:11,160 How about 30 people here and some parents as well, so enjoy that on Sunday. 172 00:14:14,100 --> 00:14:15,580 Anything else to report? 173 00:14:17,240 --> 00:14:17,460 Okay. 174 00:14:17,900 --> 00:14:25,800 We can then move on to the Council rules discussion and the work session formats are not approving 175 00:14:25,800 --> 00:14:26,400 them tonight. 176 00:14:26,400 --> 00:14:30,820 but I know there's, see, there's a couple of changes in there to discuss to bring back 177 00:14:30,820 --> 00:14:33,460 for potential adoption of the Council of Greece. 178 00:14:35,200 --> 00:14:38,380 So, turn it over to City Manager, City Attorney, and thank you, Mayor. 179 00:14:39,560 --> 00:14:41,240 City Attorney and I will do these together. 180 00:14:41,760 --> 00:14:46,060 There are only two changes, proposed or two kinds of changes, proposed. 181 00:14:46,740 --> 00:14:52,540 These are based on previous Council discussion in the case of the scheduling. 182 00:14:52,540 --> 00:14:59,920 So for those who are not familiar, the Council rules are is a document created by the City Council. 183 00:15:00,140 --> 00:15:12,740 That governs your operations, your proceedings, your interactions with staff, basically just operating procedures for you, that are able to be amended by the council as you see fit. 184 00:15:13,060 --> 00:15:21,160 Since you've recently decided to move your meetings till Tuesday, the council rules need to be amended to reflect that on a permanent basis. 185 00:15:21,160 --> 00:15:31,740 So on page 6 you will find three small changes where we have proposed you replace the word one day with the way word is Tuesday. 186 00:15:33,480 --> 00:15:39,420 For example, nothing else needs to be done but it's it's good to have this clear the laid out so that it's correct. 187 00:15:40,420 --> 00:15:48,180 And I'd like to introduce city attorney to talk about the other change which you'll find on page 25 of the council rules. 188 00:15:49,260 --> 00:15:51,180 Everybody's favorite topic, litigation. 189 00:15:52,060 --> 00:15:53,200 Thank you, Mayor. 190 00:15:53,960 --> 00:15:58,520 So the other change we're proposing has to do with the frequency of executive sessions 191 00:15:58,520 --> 00:16:04,700 that are held when the city receives a statutory notice of a claim or any other type of legal action against the city. 192 00:16:05,240 --> 00:16:13,220 As the rules are currently written, we're required to hold an executive session within 30 days of any receipt of such notices. 193 00:16:15,260 --> 00:16:17,760 from conversations with our outside council, very 194 00:16:17,760 --> 00:16:19,740 Elzner, who advise us many other cities. 195 00:16:20,320 --> 00:16:23,540 They haven't seen this type of provision in council rules 196 00:16:23,540 --> 00:16:24,140 before. 197 00:16:24,600 --> 00:16:28,040 It may be somewhat excessive depending on the nature of the 198 00:16:28,040 --> 00:16:29,640 notice that comes in. 199 00:16:29,980 --> 00:16:33,360 And I believe, since I've come in as in-house city attorney, 200 00:16:33,540 --> 00:16:35,440 you have much more access to our litigation, 201 00:16:35,740 --> 00:16:39,200 I give frequent updates, and talking with the city manager, 202 00:16:39,740 --> 00:16:42,280 we thought that it would make sense to amend this, 203 00:16:42,280 --> 00:16:44,880 that we are required, either John or myself, 204 00:16:45,420 --> 00:16:48,380 to give you notice within seven days of receiving 205 00:16:48,960 --> 00:16:51,480 any of those tort claims or other litigation notices, 206 00:16:51,740 --> 00:16:54,080 and then it will be up to you to decide whether 207 00:16:54,080 --> 00:16:56,520 or to call an executive session on that matter. 208 00:16:57,140 --> 00:16:59,540 I think it just makes more prudent use of our time, 209 00:16:59,880 --> 00:17:02,260 but still preserves the right and the option for you 210 00:17:02,260 --> 00:17:04,180 to have an executive session if you want 211 00:17:04,180 --> 00:17:06,920 a more full or briefing on the particular matter. 212 00:17:09,710 --> 00:17:10,670 Thank you for that. 213 00:17:10,670 --> 00:17:17,450 And as the city manager noted, it's on page 25 of the packet just changing from requiring 214 00:17:17,450 --> 00:17:25,130 an executive session within 30 days to within seven days we will receive the notice as 215 00:17:25,130 --> 00:17:32,510 a city council and then be able to request an executive session if needed once we receive the 216 00:17:32,510 --> 00:17:34,830 information to kind of break down of the tour claim. 217 00:17:36,710 --> 00:17:41,910 So, any comments or concerns or questions about that? 218 00:17:43,210 --> 00:17:43,890 It makes sense. 219 00:17:45,630 --> 00:17:53,090 Sounds like there's a informal consensus to move that forward, so we can, and I know we're already 220 00:17:53,090 --> 00:17:56,310 meeting on Tuesday, so there's already agreement on the first proposed change. 221 00:17:57,470 --> 00:18:00,170 Great, so we'll schedule that for your next business meeting for adoption. 222 00:18:00,410 --> 00:18:00,770 Perfect. 223 00:18:01,230 --> 00:18:01,970 Thank you for the time. 224 00:18:01,970 --> 00:18:08,510 Thank you, and thank you both, thank you, Kaylee, for flagging that provision for us to change. 225 00:18:10,930 --> 00:18:22,330 So council rules is concluded, so now we will transition to another item that the city attorney has worked a lot on, along with director Megan Big John. 226 00:18:22,330 --> 00:18:29,510 The Mary S. Young Park lease agreement with Oregon State Parks, and folks may not know this, 227 00:18:29,990 --> 00:18:36,570 but the city doesn't own that property. Probably our biggest park in the city, it's 228 00:18:36,570 --> 00:18:40,370 leased through the State of Oregon. All of a sudden, the lease agreement came up for renewal, 229 00:18:40,690 --> 00:18:45,390 and so a lot of work behind the scenes has gone into this. I've even participated in a meeting 230 00:18:45,390 --> 00:18:50,630 or two on this. So I probably stole some of your thunder. Educate the community on that, 231 00:18:50,630 --> 00:18:53,390 I'll turn it over to John and thank you, Mayor. 232 00:18:54,590 --> 00:18:56,630 Yes, I think this is a little known fact. 233 00:18:56,730 --> 00:19:00,710 There are some signs in the park that note that is owned by the State of Oregon. 234 00:19:00,970 --> 00:19:02,250 It's a long standing partnership. 235 00:19:02,330 --> 00:19:05,050 Obviously, a beloved community asset. 236 00:19:05,190 --> 00:19:07,750 But as we noted in the staff report, 237 00:19:08,870 --> 00:19:13,630 this relationship comes with some potential risks to the city 238 00:19:14,310 --> 00:19:18,230 that are financial and operational in the sense. 239 00:19:18,230 --> 00:19:23,950 And so, when the lease came up, Mayan and Hayley really died, they didn't work on this, 240 00:19:24,170 --> 00:19:26,270 we would say to Oregon that we could buy money. 241 00:19:27,090 --> 00:19:31,530 And our attention today is to give you an overview of what's in this document, 242 00:19:31,710 --> 00:19:35,570 and some of the risks that a long-term relationship carries, 243 00:19:35,970 --> 00:19:40,370 just so that we're all aware of it and going in with our eyes wide open. 244 00:19:41,590 --> 00:19:43,570 So, I think Mayan's going to start us off, 245 00:19:43,570 --> 00:19:46,890 in the past these very ways in time to time to time. 246 00:19:47,510 --> 00:19:49,670 Thank you, Councillor Mayer, for having me today. 247 00:19:49,850 --> 00:19:50,990 This has been a long process. 248 00:19:51,330 --> 00:19:55,450 It was kind of started when I got here and it's taken quite a bit of work together, 249 00:19:55,610 --> 00:19:56,850 collaboratively with State Park. 250 00:19:57,010 --> 00:19:59,910 So I just want to give you a little bit of history of what we're doing, obviously. 251 00:20:00,000 --> 00:20:29,100 The purpose here is to have you see in your packet was the red line or the agreement where we've gotten so far, and wanted to be able to ask, you know, would you want to be able to move forward with a 25 year lease agreement again the state parks? And so that's what we're doing here today, so thank you for having me. I don't really have to tell everybody here how much of a gem this park is to us, but I thought it was good to have a little bit of historical context to it as to how we would as a special and for those who don't know. 252 00:20:29,100 --> 00:20:35,020 So it is 133 acres and that's about 20% of our Parkland that we have. 253 00:20:35,360 --> 00:20:36,980 It's on the willlamot as you know. 254 00:20:37,380 --> 00:20:45,880 It became a Park in 1973 and it was donated to Oregon Parks and Recreation Department by Marius Garbo Young and her husband Thomas E. 255 00:20:46,360 --> 00:20:49,720 I'm warning a lot to this process too. I had a lot of fun research and information. 256 00:20:50,660 --> 00:20:53,740 But it's a real gem and since we've got it, we've added athletic fields in there. 257 00:20:53,740 --> 00:21:01,500 We've got, you know, the pollinator part, or pollinator card in, the dog park I found was an existence when we got it, did not realize that additional restrooms. 258 00:21:01,540 --> 00:21:07,320 So we've added some additional recreation amenities for the park users, it's quite exciting. 259 00:21:09,100 --> 00:21:10,800 This is another fun one to show. 260 00:21:10,940 --> 00:21:23,520 We have been working with a company called City Data and this is the use of within Marius Zhang over the 2024 we had about 55,000 visitors and with this data we're able to see that on average. 261 00:21:23,520 --> 00:21:29,100 the average person spends about 35 minutes in the park, and 93% of the people who visit 262 00:21:29,100 --> 00:21:35,500 are from Oregon. There are 27 other states, so that are represented. And about 75% of them 263 00:21:35,500 --> 00:21:40,180 are from Clark and Miss County. So, it was wanting to see how much of a regional park it is, 264 00:21:40,280 --> 00:21:43,880 and it still is our local jam within the Clark and Miss County area, but it's really interesting 265 00:21:43,880 --> 00:21:48,840 data to see. I don't know if you can see on that bottom blue line that yellow line that spikes up, 266 00:21:49,060 --> 00:21:52,820 that would be fall fest last year. We can now see that we had about 2,000 participants. 267 00:21:52,820 --> 00:21:54,500 kind of need information. 268 00:21:57,170 --> 00:21:59,950 So for programming, this is what you know, but for the community who 269 00:21:59,950 --> 00:22:05,010 doesn't, we obviously host a lot of summer camps, city events there. I'm shelter reservations. 270 00:22:05,430 --> 00:22:08,930 We have schools that come on a regular basis, we're trying to figure out coordinating with that, 271 00:22:08,970 --> 00:22:13,110 but they use it as a resource as well. We have down to Earth, you know, for school that's operating 272 00:22:13,110 --> 00:22:18,130 now they're during this school year as well. And then Saturday, front run club. I mean, wow, 273 00:22:18,230 --> 00:22:22,530 that was pretty neat. We had that going on as with the fall fest on Saturday. It was pretty neat to see. 274 00:22:22,530 --> 00:22:25,290 And then our amazing volunteers, they're weekly. 275 00:22:25,930 --> 00:22:30,630 I always love monthly work parties, but it's really well used and loved as we saw as 276 00:22:30,630 --> 00:22:34,270 Councilor Bonita mentioned with the parking going to the office. 277 00:22:35,170 --> 00:22:38,590 Just some stats to realize, though, that we have our volunteers give just under 278 00:22:38,590 --> 00:22:42,250 2000 annual hours annually to the park. 279 00:22:42,490 --> 00:22:43,950 I'm sure there's more that we don't capture. 280 00:22:45,390 --> 00:22:49,890 We do, as far as we have to look at Costa Covery and I wanted to find out what our 281 00:22:49,890 --> 00:22:51,470 revenue is not necessarily revenue. 282 00:22:51,470 --> 00:22:55,850 it's what we charge for fees to be able to compensate for that use and we were able to generate 283 00:22:55,850 --> 00:23:02,510 about $60,000 over the year of 2024. But when you're looking at our expenses, we were able to 284 00:23:02,510 --> 00:23:08,210 look at just some of the raw data that we had for staff to maintain the park. That barely covers 285 00:23:08,210 --> 00:23:13,350 that, which is okay, that's just not what you're trying to always be, you know, one plus one equals 286 00:23:13,350 --> 00:23:18,150 two, but it is something to look at. And just for one maintenance price, we spent about $20,000 287 00:23:18,150 --> 00:23:23,870 year on maintaining those fields. So the part is that park is loved. It's a gem. We are trying to 288 00:23:23,870 --> 00:23:31,150 look how we can streamline and continue to care for it. Oh, cowl? Cowl was there. I'm so sorry, 289 00:23:31,490 --> 00:23:35,230 I missed cowl in that picture. Louin, just like a, like an owl. 290 00:23:37,630 --> 00:23:39,970 This was, I'm pretty proud to look 291 00:23:39,970 --> 00:23:45,750 at this list. This was just information I was able to find since 2007. This isn't like all the 292 00:23:45,750 --> 00:23:50,230 all the projects that have happened at the park, but that is pretty impressive. What we've 293 00:23:50,230 --> 00:23:54,770 done over how much we've put into it and how much we have improved that space for recreational 294 00:23:54,770 --> 00:24:00,730 opportunities. Of course you see our storm cleanups too, but there's a lot of added amenities. 295 00:24:01,010 --> 00:24:06,890 It's really awesome. So what kind of came down to our main discussions with state parks is we were 296 00:24:06,890 --> 00:24:11,470 looking at trying to identify and I'll get into that conversation with state parks next, but just 297 00:24:11,470 --> 00:24:15,350 looking at holistically all of our parks in general, you've heard from me that I'm trying to figure out 298 00:24:15,350 --> 00:24:19,810 for a maintenance plan. So you saw all the things that we added to the park. There were some 299 00:24:19,810 --> 00:24:24,170 features that were in existence when we got there. And it's the parking lot, the road, 300 00:24:24,410 --> 00:24:28,310 the bridge that we're working on, the restroom, asphalt pathway, which we're fixing right now, 301 00:24:28,430 --> 00:24:34,150 and shelter. And so I'm looking at those things long-term of how we look those into our replacement plan. 302 00:24:35,170 --> 00:24:39,790 Another item that is probably the deepest concern to me is the invasive past that are coming our way. 303 00:24:39,790 --> 00:24:45,670 But a training oak bar and animal ash for those are, you know, just infestations that are just on the break of coming 304 00:24:45,670 --> 00:24:50,170 and so I really want to make sure we're prepared and have a plan with state parks to move forward on that. 305 00:24:50,690 --> 00:24:54,570 And then natural disasters, ice storm, winds, they don't even want to say the word fire. 306 00:24:55,010 --> 00:24:59,650 The things that we want to be prepared for and that's where this police agreement was trying to figure out how we can partner better. 307 00:25:00,000 --> 00:25:02,500 I have a better contiguous effort on this property. 308 00:25:05,240 --> 00:25:07,920 So I'd like to, I'm going to include our city attorney, 309 00:25:08,140 --> 00:25:14,080 Kaylee Klein in this conversation, but we had many conversations with state parks, and I have to tell you, 310 00:25:14,400 --> 00:25:19,760 they're in a tough situation too. There was a lot of things, and we actually see the document of where we had 311 00:25:19,760 --> 00:25:29,980 changed a lot of basic updates to the contract language, updates to how we procure a contractor to be able to come 312 00:25:29,980 --> 00:25:33,780 easy to work through. They really want to empower us to be able to take the lead there and 313 00:25:33,780 --> 00:25:36,860 make it easy for us to operate. I'm really grateful for that. 314 00:25:37,240 --> 00:25:41,060 The one thing that you've heard for me as I wanted to really figure out the conversation could 315 00:25:41,060 --> 00:25:48,040 we do cost sharing with some of these larger impactful situations that may be coming to us. 316 00:25:49,860 --> 00:25:53,840 As you probably have seen, state parks have had to in our local area try on 317 00:25:54,600 --> 00:25:59,220 The guy of her state park, they have now had it had in fees for day use. 318 00:25:59,660 --> 00:26:02,380 They had canceled their cultural passes that they had. 319 00:26:02,580 --> 00:26:08,100 They are really in a position to not be able to help us just to be able to, on set of these 320 00:26:08,100 --> 00:26:10,860 agreements to say, we can cost share these with you. 321 00:26:11,680 --> 00:26:15,380 But what they did do, which I was really grateful for, is you see the three things, and it's 322 00:26:15,380 --> 00:26:16,160 way more than three. 323 00:26:16,240 --> 00:26:19,720 This is very minimalizing what we all did, and I'm going to pass it to Kaylee if she wants 324 00:26:19,720 --> 00:26:20,060 to add. 325 00:26:20,060 --> 00:26:27,200 They did offer up the state forest or to come in spend eight hours with us looking at how we can make some planning for the future. 326 00:26:27,680 --> 00:26:33,560 By going with the 25-year lease, we're able to apply for grants that are through state parks. 327 00:26:34,140 --> 00:26:38,560 If we were underneath that, we would possibly not be able to apply and be qualified. 328 00:26:40,200 --> 00:26:44,980 They were wanting to be, they were offered to be able to have a better collaboration with their regional leaders 329 00:26:44,980 --> 00:26:49,560 and there are regional park rangers to be able to collaborate more, especially with those 330 00:26:49,560 --> 00:26:54,140 invasive insects coming through, or who are you using to buy the bridge that you guys would 331 00:26:54,140 --> 00:26:58,060 where do you guys buy bridges, you know, just having that, you know, brain trust amongst us, 332 00:26:58,060 --> 00:27:03,560 which is really huge. And then they did not take off the table, wanted to be able to put in language 333 00:27:03,560 --> 00:27:08,540 in there that says, we can talk about future cost sharing if we've come up with this situation. 334 00:27:09,380 --> 00:27:13,560 The one thing I did emphasize is a lot of the planning for these natural disasters you have to 335 00:27:13,560 --> 00:27:16,920 work on pre-planning events so that when they occur, you know what to do. 336 00:27:17,900 --> 00:27:21,440 They don't have the money to help with that for now, but they are engaged in that, and 337 00:27:21,440 --> 00:27:23,680 we'll be working cohesively together on it. 338 00:27:24,400 --> 00:27:26,740 Kaylee, does you have anything else you wanted to add? 339 00:27:27,340 --> 00:27:30,160 I'm sure you did a great job making the introducing that topic. 340 00:27:30,240 --> 00:27:37,040 We worked really closely with the state, and we had many asks, we came forward with, and 341 00:27:37,040 --> 00:27:42,380 although we did not achieve them all, I definitely feel confident that we improved this particular 342 00:27:42,380 --> 00:27:46,960 agreement in terms of the reducing the city's risks and potential financial obligations. 343 00:27:47,940 --> 00:27:54,020 When this came to my desk and I saw that I was a 25 year lease that obviously peaks your 344 00:27:54,020 --> 00:27:59,160 interest in terms of making sure we review this with a fine tooth comb, especially given that 345 00:27:59,160 --> 00:28:04,660 when I worked with Megan, you know, she noted there's a lot of major expenses with caring 346 00:28:04,660 --> 00:28:08,260 for a 133 acre park and we're not compensated for that. 347 00:28:08,260 --> 00:28:13,680 basically like a steward carrying this out on behalf of the state. And so I wanted to know 348 00:28:13,680 --> 00:28:19,600 what some of those potential expenses were. One of them is that she mentioned is the total, 349 00:28:19,700 --> 00:28:25,140 I was going to say repair, but actually the total replacement of a major flip bridge that's going 350 00:28:25,140 --> 00:28:30,760 to be in the avenue of, you had an estimate of 50. I'm hoping that's not that much. I'm trying to apply 351 00:28:30,760 --> 00:28:36,400 for $50,000, which was a bridge installed by the state, not by the city. And so, you know, my 352 00:28:36,400 --> 00:28:40,840 question is why is the city settled with these costs when we're basically the caretaker 353 00:28:40,840 --> 00:28:46,520 on behalf of the state, and then the other major flag for me was this, I was going to say 354 00:28:46,520 --> 00:28:52,360 impending, but somewhat arrived threat of the Mediterranean Opor, and the Emerald Ashfore, 355 00:28:53,000 --> 00:28:59,640 and given that we have over 1,000 Ops and Marius Young, the cost of treating and or removing 356 00:28:59,640 --> 00:29:05,200 trees should they be infected, it is a huge expense for the city, so we went back and forth 357 00:29:05,200 --> 00:29:11,880 basically what it came down to is the state is really strapped for funds as well and I had originally 358 00:29:11,880 --> 00:29:17,300 proposed cost sharing mechanisms like they pay half the cost or some of the or maybe 25 359 00:29:17,300 --> 00:29:24,740 percent of the cost and really it got down to like all they can give is support from employees in 360 00:29:24,740 --> 00:29:30,500 terms of expertise in terms of loading particular individuals the whole the brain trust that 361 00:29:30,500 --> 00:29:35,140 and talked about, which in fact, we did find is more helpful and it felt like we furthered 362 00:29:35,140 --> 00:29:40,760 our partnership. And as I'm looking at this, it occurred to me that we attached the clean 363 00:29:40,760 --> 00:29:45,400 version of the proposal, which is what we normally do so you can review, but you're unable to 364 00:29:45,400 --> 00:29:50,380 see all the changes we made. So after this meeting, I can circulate the red line if you want to 365 00:29:50,380 --> 00:29:55,860 really be able to hone in on where we worked. But one of the issues, for example, what we really 366 00:29:55,860 --> 00:29:59,980 did was try and put the responsibilities of a landowner back with a landowner. 367 00:30:00,000 --> 00:30:14,820 And the responsibilities of a lesser, you know, with the city. So, for example, in their agreement, they had us being responsible for legal encroachments to the park. 368 00:30:15,120 --> 00:30:21,120 That was in 5.5 and that was really concerning to make it to myself given the amount of acreage. 369 00:30:21,320 --> 00:30:29,800 And so we made sure to add language where we would collaborate to help resolve, but the final resolution of encroachments, including 370 00:30:29,800 --> 00:30:36,200 but not limited to legal action is the responsibility of ORPDs, so we will release the city 371 00:30:36,200 --> 00:30:41,180 attorney time to, you know, handle encroachments of that area. 372 00:30:42,820 --> 00:30:50,660 One place that we also worked on was law enforcement activity that was something important 373 00:30:50,660 --> 00:30:57,660 to PD that they had wanted to make sure it was abundantly clear that they are able to enforce 374 00:30:57,660 --> 00:31:03,940 city code within the park and show up as law enforcement officers within the state jurisdiction 375 00:31:03,940 --> 00:31:09,500 within the state boundaries. And they said that was fine and we clarified that there. 376 00:31:10,080 --> 00:31:18,200 I also made sure given these upcoming potential expenses with the with the insects that we had 377 00:31:18,200 --> 00:31:24,880 an ability to terminate if we needed to sooner than 25 years without any penalties. So we worked 378 00:31:24,880 --> 00:31:28,880 on that language, originally in section 25, 379 00:31:29,180 --> 00:31:32,560 it was pretty difficult for the city to subcontract out work. 380 00:31:33,080 --> 00:31:38,580 We had to have written approval from OPRD 381 00:31:38,580 --> 00:31:42,080 and with the amount of work that Parks and Rec candles there, 382 00:31:42,200 --> 00:31:44,540 it just really was administratively burdensome. 383 00:31:45,160 --> 00:31:46,920 So they loosened up a lot on that, 384 00:31:47,160 --> 00:31:50,380 gave us much greater authority to subcontract out work. 385 00:31:51,300 --> 00:32:04,540 And then we spend a lot of time in the exhibit B, sometimes we skip the exhibits but this is probably the most important part of the agreement because it talks about the statement of work in terms of what we as the city have to provide. 386 00:32:05,120 --> 00:32:15,420 So we really struck a lot of the language that had to do with replacing or even upgrading things and focused on where responsible for general maintenance. 387 00:32:17,380 --> 00:32:27,560 And that if replacement costs were basically replacement costs are cabin by our own financial constraints in the budget that we have. 388 00:32:27,600 --> 00:32:33,520 You know, we're not expected to restore everything that was in the park that had been originally provided by the state. 389 00:32:34,340 --> 00:32:39,420 And then you'll see in section four, we queue out. 390 00:32:39,420 --> 00:32:45,380 You have the issue that is probably the most concerning as the cost of handling these insects and we agreed 391 00:32:45,380 --> 00:32:52,280 We kind of kicked the can down the road, but we agreed that those costs would be determined in an amendment to this agreement 392 00:32:52,280 --> 00:32:59,720 And so we're carving that area out to address winter if it arises in terms of payment 393 00:32:59,720 --> 00:33:03,020 It is a tough relationship because we really like 394 00:33:03,580 --> 00:33:09,140 We appreciate the benefits of the park and life being stewards, but when you have costs, 395 00:33:09,640 --> 00:33:11,680 Megan, could you get a little bit to the cost? 396 00:33:11,900 --> 00:33:15,540 Wilson Miller, maybe some other cities have dealt with with regard to those insects. 397 00:33:16,280 --> 00:33:18,220 Yeah, just an example for Wilsonville. 398 00:33:18,440 --> 00:33:24,280 One of their trees was about 35,000 to yield her move, but they had to have a crane to bring in, 399 00:33:24,360 --> 00:33:28,240 especially think of property lines on the interior of a park, where they could access it, 400 00:33:28,240 --> 00:33:34,060 And then the way you dispose of those, that is ever changing, but at the time, they had 401 00:33:34,060 --> 00:33:39,860 direct barrier somewhere, so that I find a property owner to take the oak to bury it 402 00:33:39,860 --> 00:33:42,620 and then had to do treatments at the location. 403 00:33:42,920 --> 00:33:49,760 And so that education and that education, that template model is ever evolving right now 404 00:33:49,760 --> 00:33:55,120 with a working department of agriculture in state for, or in part in forestry as well. 405 00:33:55,120 --> 00:33:59,980 But even just like the one oak that we have that's dead there now that is not infested with my train oak 406 00:33:59,980 --> 00:34:04,980 Poor we have to drop it and ship it is get it down to one inch slices as best as we can 407 00:34:05,820 --> 00:34:07,540 How much was it again for one tree? 408 00:34:08,360 --> 00:34:11,480 $35,000. How many trees do we have in Mary's young did you say? 409 00:34:12,580 --> 00:34:17,420 That's thousand and that's just an estimate from our consulting arborist and so what you're looking at again 410 00:34:17,420 --> 00:34:22,580 That's not just a sustainable cost. I it my worry with this is that was something we're like this to happen 411 00:34:22,580 --> 00:34:37,750 We don't own that property, but what happens to all the other acres that we have, where do I focus my energy and time with our resources on and that was kind of where this has started a fuel to kind of, how do we get them as a better partner to be able to take some of that ownership or 412 00:34:38,210 --> 00:34:42,490 where we should our tax dollars go to and where is our highest risk as a city. 413 00:34:43,990 --> 00:34:48,530 So, yeah, so that, again, that was when Wilsonville was taking their trees down a year, 414 00:34:48,550 --> 00:34:53,190 two years ago, luckily they're evolving, finding that you cannot dispose of those trees that way. 415 00:34:53,590 --> 00:34:57,390 You would not be able to, and Emerald Ashfore is honestly a bigger risk and concern, 416 00:34:57,650 --> 00:34:59,870 because it comes through in the amount of ash we have. 417 00:35:00,000 --> 00:35:11,740 And our wetland areas, string corridors is greater as much faster, but our oaks you can't replace that size of a large tree in any short amount of time, so they're both of a risk. 418 00:35:12,320 --> 00:35:21,400 So cities around are trying to figure this method out, we don't want to go in without having some sort of plan of who's responsible for what, when and if and should that occur. 419 00:35:22,420 --> 00:35:23,800 I'm glad you tracked that. 420 00:35:23,800 --> 00:35:34,640 And so before we had those conversations and made these amendments, it made it, it could be read that the city would be responsible for those types of remediation and treatment costs. 421 00:35:35,180 --> 00:35:43,000 And so again, I would direct your attention to section four of exhibit B where it talks about how we will handle these types of insect or disease. 422 00:35:43,000 --> 00:35:44,560 and it says, 423 00:35:47,380 --> 00:35:51,320 we further agree that both parties have the right to terminate the agreement 424 00:35:51,320 --> 00:35:53,860 if a mutually agreeable amendment cannot be reached. 425 00:35:54,240 --> 00:35:58,560 So basically that's the carve out for the city if we're unable to strike some type of 426 00:35:58,560 --> 00:36:04,880 cost sharing deal or agreement on how that level of costs would be handled then we would 427 00:36:04,880 --> 00:36:06,260 be able to terminate the agreement. 428 00:36:08,480 --> 00:36:12,940 One of the things I wanted to add is if you look at the dollars and cents spent on this 429 00:36:12,940 --> 00:36:15,860 beautiful acres, but it really ultimately comes down to safety, right? 430 00:36:15,860 --> 00:36:20,120 wanting to make sure that we can preserve this park, not only for what it is to keep those amenities 431 00:36:20,120 --> 00:36:24,500 safe for the public to be able to enjoy and experience, and so that's kind of where my heart 432 00:36:24,500 --> 00:36:29,500 is with it. I've just how can we continue? We're planning to, but we want to make sure that we 433 00:36:29,500 --> 00:36:33,800 have that great strong partnership with, you know, with OPRD. 434 00:36:39,830 --> 00:36:40,730 Oh, my last slide. 435 00:36:43,010 --> 00:36:44,030 So, I wanted to ask 436 00:36:44,030 --> 00:36:47,370 for questions, but we're at right now as next steps is, you know, 437 00:36:47,450 --> 00:36:49,310 do you plan on what feedback we get from you today? 438 00:36:49,510 --> 00:36:51,710 And for the discussion we have is finalizing the legal 439 00:36:51,710 --> 00:36:55,930 language with state parks to figure out where we want to go. 440 00:36:56,290 --> 00:36:58,990 Do you plan on where right now we're set to come back to you 441 00:36:58,990 --> 00:37:02,110 if they're ready to move forward on November 12th? 442 00:37:02,230 --> 00:37:04,010 But that depends on what questions you have. 443 00:37:04,230 --> 00:37:08,010 And so when it open the 40th, the questions you might have. 444 00:37:08,690 --> 00:37:11,930 Well, thank you for the detail and the presentation. 445 00:37:11,930 --> 00:37:15,930 and good agenda report also with the documents in there. 446 00:37:16,890 --> 00:37:19,370 Council President has a question to kick us off. 447 00:37:19,710 --> 00:37:20,210 Thank you, Mayor. 448 00:37:20,770 --> 00:37:21,870 Yes, thank you so much. 449 00:37:22,030 --> 00:37:27,150 Both of you, all of the hours that you have spent on this very important matter. 450 00:37:27,670 --> 00:37:35,150 Just to be clear, this language, as it is right now, is in agreement with the state. 451 00:37:36,990 --> 00:37:46,530 Yes, so this is the language you have the clean copy was now resting with the state after we did all the back and forth redlining and it has been referred to their 452 00:37:46,530 --> 00:37:49,970 Organ department of justice. This is in a training general for review 453 00:37:49,970 --> 00:38:00,230 Basically their client has agreed to all the terms that we'll have one last look by or in the OJ and they're trying aiming to get back to us before the business meeting 454 00:38:00,230 --> 00:38:06,330 So that we could keep it on that meeting if there were any changes proposed, it would be in that staff agenda report. 455 00:38:06,910 --> 00:38:12,630 And if they are unable to turn around the legal review, then we'll push it to the following business meeting. 456 00:38:13,710 --> 00:38:20,890 Okay. So there is a potential that this will be approved. There won't be changes. 457 00:38:21,550 --> 00:38:21,750 Potentially. 458 00:38:22,870 --> 00:38:24,350 Okay. Thank you. 459 00:38:26,940 --> 00:38:35,420 Councillor Groner. Yeah, two questions. You mentioned the number 20,000 as revenue and I'm not sure is that what you are 460 00:38:35,420 --> 00:38:39,800 Excuse me as expenses. Is that what you're currently spending exclusive of 461 00:38:41,020 --> 00:38:46,500 Continuencies? No, I wasn't sure what that number referred to. Thank you for asking and sorry for that being confusing 462 00:38:46,500 --> 00:38:54,800 No, it was just an example of one cost we have there. Is that's for maintaining athletic fields over a year and a half time frame from 463 00:38:54,800 --> 00:38:59,200 fertilizing to air rating, just the work that that takes to care of those fields. 464 00:39:00,260 --> 00:39:02,720 So I don't have the full annual cost of it. 465 00:39:02,820 --> 00:39:08,280 We do track our hours by park, but we were struggling to get the exact number, 466 00:39:08,640 --> 00:39:10,580 missing the seasonals as well. 467 00:39:10,800 --> 00:39:14,480 And so that's where it came around 50,000 for just the labor to be able to maintain that. 468 00:39:14,480 --> 00:39:17,080 But I know that's not encompassing everything that we do there. 469 00:39:17,560 --> 00:39:17,840 Yeah. 470 00:39:17,840 --> 00:39:20,820 In general, it's far in exceed 50,000 revenue. 471 00:39:21,600 --> 00:39:21,800 Yeah. 472 00:39:21,800 --> 00:39:25,840 the 60,000 revenue that we have there to help offset our costs. 473 00:39:26,120 --> 00:39:28,460 My other question is, you mentioned a bridge that made it replace. 474 00:39:28,840 --> 00:39:32,320 This is not the bridge that was destroyed during the ice storm. 475 00:39:32,800 --> 00:39:36,940 No, that one had to be let go, but this is the other beautiful footbridge, 476 00:39:36,940 --> 00:39:39,440 it's like a 30-foot span, over. 477 00:39:39,720 --> 00:39:40,960 So you hold a railroad bridge? 478 00:39:40,980 --> 00:39:42,060 Yes, it is. 479 00:39:42,080 --> 00:39:43,820 So we are looking to get that replaced. 480 00:39:44,060 --> 00:39:49,020 One amendment to that came from this contract or agreement was that we had to have any deferred 481 00:39:49,020 --> 00:39:50,920 maintenance repaired in 30 days. 482 00:39:51,540 --> 00:39:56,120 And so that is now a little longer in that language is that we're going to repair that as soon as we can. 483 00:39:56,300 --> 00:39:58,860 Like I hope to get that repaired by next summer as my goal. 484 00:39:59,420 --> 00:39:59,980 But we're still looking... 485 00:40:00,000 --> 00:40:04,680 We're looking at our funding options for it, and hopefully I'm going to be applying for a grant to get some help for it. 486 00:40:05,120 --> 00:40:05,520 Thank you. 487 00:40:05,540 --> 00:40:06,100 You're welcome. 488 00:40:08,750 --> 00:40:11,030 Any other questions? 489 00:40:11,570 --> 00:40:14,850 It's a complicated legal document, taking a look at it. 490 00:40:15,270 --> 00:40:19,030 But I just feel like looking at it and hearing from the presentation that you gave. 491 00:40:19,470 --> 00:40:25,850 You've done all that you can on behalf of Westland to get the best possible lease and the best possible terms. 492 00:40:26,050 --> 00:40:27,370 And I participated in one of the meetings. 493 00:40:27,370 --> 00:40:34,930 And it was clear that the state was coming out from a very difficult financial position because there could make in cuts and having budgetary issues. 494 00:40:35,770 --> 00:40:40,130 So I feel like it's, we're not going to be able to get much better than this if we want to have a lease. 495 00:40:40,410 --> 00:40:46,610 And if we don't have a lease and we lose one of our precious assets or we get thrown into uncertainty. 496 00:40:46,830 --> 00:40:57,350 So I think the community would expect us to get this approved, but we do have to be realistic about the financial planning and realities for things like oak borer. 497 00:40:57,350 --> 00:41:00,210 and the replacement costs for facility. 498 00:41:00,990 --> 00:41:02,550 So just to be clear, they're not contributing 499 00:41:02,550 --> 00:41:04,090 to that footbridge, for example, 500 00:41:04,390 --> 00:41:07,270 that's kind of on our, okay, interesting. 501 00:41:08,370 --> 00:41:09,950 Regarding that footbridge, Megan, 502 00:41:10,130 --> 00:41:11,970 is hoping to apply for a grant for that, 503 00:41:12,030 --> 00:41:13,290 and what that is, one of the terms, 504 00:41:13,410 --> 00:41:15,990 we negotiated that they said they have a number four, 505 00:41:16,130 --> 00:41:18,510 but we have them agreeing to work with us. 506 00:41:18,510 --> 00:41:19,170 I'm grant funding, 507 00:41:19,190 --> 00:41:22,710 providing letters of support, social sending regular updates 508 00:41:22,710 --> 00:41:25,170 to Megan when they have grant opportunities arise 509 00:41:25,170 --> 00:41:26,130 with their aware of. 510 00:41:26,130 --> 00:41:30,690 So that was just one way to try and pull in a little bit of their expertise and guidance 511 00:41:30,690 --> 00:41:33,150 and helping us get grant applications in. 512 00:41:33,470 --> 00:41:35,070 See, that's awesome work. 513 00:41:35,130 --> 00:41:36,370 Thank you for that. 514 00:41:36,510 --> 00:41:38,350 The city, thanks you. 515 00:41:38,650 --> 00:41:40,950 Council President and then Councillor Bonnetian has a comment. 516 00:41:41,390 --> 00:41:41,750 Thank you. 517 00:41:41,750 --> 00:41:42,390 Thank you, Mayor. 518 00:41:43,110 --> 00:41:43,130 Yes. 519 00:41:44,110 --> 00:41:47,230 So it comes to mind just because I last week. 520 00:41:47,230 --> 00:41:52,990 I think got an email from the friends of Tran Creek that they are now charging $10 a day. 521 00:41:52,990 --> 00:42:01,590 for cars to park in, I mean, I'm assuming it won't be $10 if you walk in, there's places 522 00:42:01,590 --> 00:42:09,630 to park outside of, I only bring this up because the unpopular suggestion question of should 523 00:42:09,630 --> 00:42:19,670 we look into any kind of a fee for using the park, in any way, whether it's teams that 524 00:42:19,670 --> 00:42:26,270 fields or I'm just throwing this out there very unpopular idea I'm sure but I'm in the reality 525 00:42:26,270 --> 00:42:35,490 is we money doesn't grow on trees and especially if there's oak boards in them so I also wonder 526 00:42:35,490 --> 00:42:44,090 so isn't triunct creek a state so I was kind of curious about any any comparables and learning 527 00:42:44,090 --> 00:42:51,530 from each other. So, well that is still owned and managed ultimately by state parks. They have 528 00:42:51,530 --> 00:42:56,470 a friend's group, the friends of Trion, who manages the programming out of that location, and 529 00:42:56,470 --> 00:43:01,110 so that fee is going to state parks to my understanding. So, my givers and other similar one that 530 00:43:01,110 --> 00:43:05,850 but doesn't have a friends of that state parks is putting that. So, all of their state parks 531 00:43:05,850 --> 00:43:13,930 and I believe have a day use fee. So, the city of Lake Oswego doesn't have to pay for Trion Creek. 532 00:43:13,930 --> 00:43:18,850 city of like us we go does not manage that state parks at us city of like us we go but they 533 00:43:18,850 --> 00:43:23,750 okay they denied that several years back while I was there due to the funding ability. 534 00:43:24,090 --> 00:43:29,770 I'll interesting. Oh well thank you very much and council president I would just begin 535 00:43:29,770 --> 00:43:35,510 note to that comment which is very on point if you look to section six of compensation and payment 536 00:43:35,510 --> 00:43:42,490 terms on page three there is an express provision about that it says the city shall have the option 537 00:43:42,490 --> 00:43:51,570 And it's so discretion to charge park visitors for parking fees or other special use fees to help generate revenue for operations and maintenance of the property. 538 00:43:52,130 --> 00:44:02,350 So long as such activities are consistent with the LWCF Act, that is the landed water conservation fund act, which overlays the property. 539 00:44:03,570 --> 00:44:10,330 And so that is an option that we haven't really explored, but it is something that the lease allows us to do and keep those funds. 540 00:44:11,390 --> 00:44:15,670 And one thing to elaborate to make sure it may not have been clear, but we do charge for 541 00:44:15,670 --> 00:44:16,810 our shelter use, right? 542 00:44:17,030 --> 00:44:18,150 We do charge for tournaments. 543 00:44:18,890 --> 00:44:25,170 We do not currently charge for day like just a weekly camps or not at that camps. 544 00:44:25,610 --> 00:44:30,310 Practices for sports lakes there, they pay for tournaments, we do have camps there, and then 545 00:44:30,310 --> 00:44:32,810 there's also special event permits that we provide. 546 00:44:33,210 --> 00:44:38,530 So we do have some of that fee cost recovery with that, and the one thing with parking is 547 00:44:38,530 --> 00:44:41,810 to figure out how you're going to manage. You get the fee, but you have to have somebody 548 00:44:41,810 --> 00:44:46,950 be able to monitor to make sure it's being applied correctly. So it's a little bit of a, 549 00:44:46,950 --> 00:44:50,370 you know, there has been, I guess, talking the past of our, you know, boat launches. Is that, 550 00:44:50,450 --> 00:44:54,430 is that a good possibility for that, but you have to have me in power to be able to monitor it to be 551 00:44:54,430 --> 00:44:54,850 effective? 552 00:44:57,160 --> 00:44:59,980 Good point. Councillor Bonnetin, go ahead. 553 00:45:02,400 --> 00:45:13,320 That's pretty relevant to what I'm thinking. It would be fantastic to be able to explore charging for parking, even if it's just at certain events, certain times. 554 00:45:14,360 --> 00:45:29,980 The thing that stood out to me on Saturday, while that traffic line was happening, was that it would be great if people could park elsewhere and walk, but that's not even practical, because there's not a crosswalk for quite a way. 555 00:45:29,980 --> 00:45:35,600 in either direction. There was an access issue there. So if we're going to be doing something 556 00:45:35,600 --> 00:45:40,840 like that, we're going to need some help from the state to be able to create a crosswalk 557 00:45:40,840 --> 00:45:46,620 because that's also their highway. I know different state departments are pretty far apart, 558 00:45:47,480 --> 00:45:52,940 but it seems like it would be nice if we could get some cooperation on that as well, adding 559 00:45:54,580 --> 00:45:59,860 crosswalks at all. I believe one of them is almost a mile away to the south and then the other ones 560 00:45:59,860 --> 00:46:02,520 not particularly close to either. 561 00:46:04,760 --> 00:46:07,000 So, yeah, would we have any difficulty? 562 00:46:07,560 --> 00:46:10,560 I know adding parking is no one's favorite idea, 563 00:46:10,660 --> 00:46:12,980 but if we needed to make reconfigurations 564 00:46:14,280 --> 00:46:16,840 or changes to other elements of the park, 565 00:46:16,940 --> 00:46:18,860 is that going to be very difficult with this lease? 566 00:46:21,700 --> 00:46:23,080 I might turn to you, 567 00:46:23,200 --> 00:46:25,380 because I think you have a little experience with the changes 568 00:46:25,380 --> 00:46:27,440 to get the ball field and things like that. 569 00:46:27,660 --> 00:46:29,380 Yeah, so any changes, 570 00:46:29,380 --> 00:46:35,600 because I'm not going to have the exact information, but what we had to do in the past, we have 571 00:46:35,600 --> 00:46:42,340 there is a stewardship requirement for the, for the park in the deed to remain for parks and 572 00:46:42,340 --> 00:46:47,680 recreational uses. So obviously there was a park added. There was the ballfills that were added 573 00:46:47,680 --> 00:46:52,920 and you had to go through that process to be able to seek that permission and verification for 574 00:46:53,520 --> 00:46:58,220 from state parks. I don't know if John has any history on that either. But it's just, it's going 575 00:46:58,220 --> 00:47:01,840 essentially applying to state parks to say what you're wanting to do with the intent is to 576 00:47:01,840 --> 00:47:06,260 and then to verify that it meets the deed restrictions on there. The interesting part 577 00:47:06,260 --> 00:47:10,460 you can go there and there's a new parking at all and then you go the other days is there's 578 00:47:10,460 --> 00:47:15,720 a ton of parking. So when I drive through and I know events are going so when there's like 579 00:47:15,720 --> 00:47:19,420 middle school cross country meet and there's like five different teams there you know we found 580 00:47:19,420 --> 00:47:24,180 okay buses can't park there so we make those adjustments. We had a debrief about fall fest today 581 00:47:24,180 --> 00:47:26,680 and try to wonder, have we outgrown it? 582 00:47:26,800 --> 00:47:28,060 What do we do with these parking? 583 00:47:28,260 --> 00:47:29,460 Do we, whether we're just going to talk with PD 584 00:47:29,460 --> 00:47:30,860 about a traffic control plan? 585 00:47:31,220 --> 00:47:33,080 So there's things that we are trying to mitigate that 586 00:47:33,080 --> 00:47:35,480 because it's a few times out of the year where that happens, 587 00:47:36,100 --> 00:47:37,400 but it is very impactful. 588 00:47:37,960 --> 00:47:39,760 So I really appreciate you bringing that up. 589 00:47:40,020 --> 00:47:41,920 But I think getting additional parking may be tricky 590 00:47:41,920 --> 00:47:43,200 there with the uses we have, 591 00:47:43,400 --> 00:47:45,360 but you should explore an option we have. 592 00:47:45,660 --> 00:47:46,280 Thank you. 593 00:47:46,860 --> 00:47:48,620 Appreciate the comments on the crosswalk also. 594 00:47:48,680 --> 00:47:49,300 We should do that. 595 00:47:49,360 --> 00:47:52,680 I used to live along there, it's very hard to cross over 596 00:47:52,680 --> 00:47:55,940 get to Marius and it'd be helpful for access to the park. 597 00:47:56,120 --> 00:48:01,060 I'm going to go to Carol and I'm going to go to Leo and then we will wrap up and move on 598 00:48:01,060 --> 00:48:05,320 to the next agenda item and I'll give Council Chancellor put any concerns they have on the 599 00:48:05,320 --> 00:48:09,860 record or any information requests after the Council of Rights please. 600 00:48:10,280 --> 00:48:16,960 So I was going to say on Saturday I walked over from where I live to the fall fest and one 601 00:48:16,960 --> 00:48:22,220 thing I noticed, yes there was a lot of traffic but I also noticed a lot of people walking on 602 00:48:22,220 --> 00:48:27,460 pathway in front of Marius Young. I don't know, I didn't recognize most of these people, 603 00:48:27,740 --> 00:48:32,240 so I don't know if they were my neighbors in Robinwood, but there is a park and ride at the 604 00:48:32,240 --> 00:48:37,360 church there on the corner, and it's possible that people knowing that parking could be a challenge, 605 00:48:38,040 --> 00:48:41,780 took advantage of the park and ride and walked to the park. 606 00:48:44,200 --> 00:48:46,560 Thank you for that. Councillor Groner. 607 00:48:47,340 --> 00:48:54,080 Yes, I just want to throw out an idea for revenue. I think sometimes I have stickers that you can buy 608 00:48:54,140 --> 00:49:00,300 and put on your car, that might entitle you to park on certain days in the park or for that matter 609 00:49:00,300 --> 00:49:06,520 use of might be a different sticker for the boat ramps, but this might be, and it doesn't 610 00:49:06,520 --> 00:49:11,320 involve somebody standing there collecting revenues presumably somebody could periodically 611 00:49:11,320 --> 00:49:16,200 patrol and see who doesn't have a sticker and give them traffic ticket or something. 612 00:49:18,120 --> 00:49:19,100 Just a thought. 613 00:49:20,860 --> 00:49:24,000 Councillor Bonnington, last comment, thank you Councillor Groner for that. 614 00:49:24,000 --> 00:49:29,420 Yeah, this reminds me that there are actually parking program 615 00:49:29,420 --> 00:49:32,000 computer programs that have been developed. 616 00:49:32,500 --> 00:49:34,920 You just need a clear camera view of the lot. 617 00:49:35,700 --> 00:49:38,360 And when someone parks, they pay, and they put in what spot 618 00:49:38,360 --> 00:49:39,660 they're in with their license plate. 619 00:49:39,940 --> 00:49:43,320 And the camera can detect that cars in there, 620 00:49:43,960 --> 00:49:45,620 or there's a car there that hasn't paid. 621 00:49:46,140 --> 00:49:48,060 And it skipped the entire need for manpower 622 00:49:48,060 --> 00:49:51,180 for the most part compared to what we're talking about. 623 00:49:51,700 --> 00:49:53,300 So that could be a very cost effective way 624 00:49:53,300 --> 00:49:59,960 doing that? Well, as you go forward with working on this leap. 625 00:50:00,600 --> 00:50:23,540 And then we'll move into the next phase where we go back to kind of the status quo of using the park, if there's issues that come up on the revenue side, where you feel like you need, you know, there's a huge deficit or, you know, issues with Marius and that would require council conversations about revenue for the park, just bring it back to us. 626 00:50:23,540 --> 00:50:41,340 And as I know you would, if there was something going, but like if that borrower shows up and we're in the whole somehow we might have to have some serious conversations about those sorts of ideas, but for now I think it's good to just get the least done and then we will see what we need to do going forward. 627 00:50:41,920 --> 00:50:47,400 Sounds great and I really appreciate Kaylee brought a lot to the table and had just her resources and knowledge. 628 00:50:47,540 --> 00:50:51,480 I was super grateful to have that support through this. I couldn't have done it without her, so thank you. 629 00:50:51,480 --> 00:50:56,540 Any, any issues, any council would like to put on the table for changes to the lease or 630 00:50:56,540 --> 00:51:02,800 additions to the lease or any sort of thing like that at this time just for a check. 631 00:51:04,800 --> 00:51:06,620 And obviously you can, this is a work session. 632 00:51:06,800 --> 00:51:09,860 So if you think of something, you can write into the city attorney and parks director. 633 00:51:10,800 --> 00:51:13,760 But I think you've done a great job on behalf of the city. 634 00:51:15,540 --> 00:51:16,860 So, no to the next steps. 635 00:51:16,960 --> 00:51:22,020 So we'll schedule this for a business meeting and November pending DOJ's legal review. 636 00:51:22,020 --> 00:51:22,760 It sounds like. 637 00:51:23,200 --> 00:51:27,560 That's exactly the next step, so we will schedule it as soon as we can, based on the review 638 00:51:27,560 --> 00:51:28,580 we get back from the state. 639 00:51:28,980 --> 00:51:33,500 The last thing that I want to add is obviously all of the financial issues that Megan described 640 00:51:33,500 --> 00:51:34,740 for this park. 641 00:51:35,140 --> 00:51:35,660 It's the same. 642 00:51:35,780 --> 00:51:39,780 We have hundreds of other acres of parks and every single thing that you just heard is true 643 00:51:39,780 --> 00:51:40,720 about every other acre. 644 00:51:41,240 --> 00:51:47,780 If we have the ash borer or the emerald borer in our park system generally, we don't have 645 00:51:47,780 --> 00:51:54,260 some massive sinking fund to pay for a huge unexpected incident like that. 646 00:51:54,540 --> 00:51:59,120 And so we would be having just as much a problem and it won't be confined to one 647 00:51:59,120 --> 00:51:59,380 park. 648 00:51:59,380 --> 00:52:00,140 It'll be everywhere. 649 00:52:00,460 --> 00:52:06,640 This is one where we have this opportunity to assess and agree to a level of 650 00:52:06,640 --> 00:52:13,900 involvement, but for the other 500 acres or 600 acres of park that we own, we don't have 651 00:52:13,900 --> 00:52:14,420 a agreement. 652 00:52:15,080 --> 00:52:17,460 We own it all and we're responsible for it. 653 00:52:17,460 --> 00:52:22,500 So it's a pretty big deal, and I think thinking of our park system much like a water system, 654 00:52:22,620 --> 00:52:30,480 much like a street system, it's an infrastructure that we own that comes with deferred maintenance that comes with potential liability is probably important, 655 00:52:30,480 --> 00:52:37,640 because I don't think we all always think of our park system that way, and it takes something like this to make us realize, oh my gosh, 656 00:52:38,080 --> 00:52:45,740 we had to pay $10,000 a tree to have it removed and properly disposed of in our entire hundreds of acres. 657 00:52:45,740 --> 00:52:48,160 It would be a huge thing for this community. 658 00:52:48,640 --> 00:52:50,120 So it's worth thinking about more globally. 659 00:52:51,320 --> 00:52:52,640 That's great point. 660 00:52:52,920 --> 00:52:55,700 And on that, you know, people have parks. 661 00:52:56,540 --> 00:53:01,360 I know I usually suggest goats, but beavers, just saying. 662 00:53:02,640 --> 00:53:05,700 And Megan, if you go to, there's a parksport meeting 663 00:53:05,700 --> 00:53:07,980 and if you'd like, I'd love to hear their thoughts on, 664 00:53:08,200 --> 00:53:10,140 just whether we should approve the lease. 665 00:53:10,280 --> 00:53:11,640 Yes, I will add that to the agenda. 666 00:53:11,920 --> 00:53:12,180 That's great. 667 00:53:12,360 --> 00:53:15,500 For them, I know they're very engaged in a good group of people. 668 00:53:15,500 --> 00:53:17,300 So we'll look forward to hearing that. 669 00:53:17,320 --> 00:53:19,720 I'm sure they'd appreciate the update on this, too. 670 00:53:20,160 --> 00:53:20,460 Absolutely. 671 00:53:20,720 --> 00:53:21,720 Thank you all. 672 00:53:22,140 --> 00:53:22,960 Thank you, Megan. 673 00:53:23,720 --> 00:53:28,220 With that, we will then transition to another big topic 674 00:53:28,220 --> 00:53:32,820 for the city, which is the Waterfront Vision Plan, 675 00:53:32,980 --> 00:53:35,860 which is nearing its final stages here. 676 00:53:36,040 --> 00:53:37,980 It's in the final stages nearing adoption. 677 00:53:39,080 --> 00:53:41,220 We've received some public testimony earlier. 678 00:53:41,360 --> 00:53:43,160 We received a couple of letters as well 679 00:53:43,160 --> 00:53:44,360 that will be entered into the record 680 00:53:44,360 --> 00:53:50,520 for this work session, and this is envisioned to be the final work session till we adopt. 681 00:53:50,640 --> 00:53:55,160 And I know that we have some folks here from the advocates who I also send in a slide 682 00:53:55,160 --> 00:53:56,820 show that they would like to present. 683 00:53:56,920 --> 00:53:59,540 Are they able to present that as well when they speak? 684 00:54:01,180 --> 00:54:05,780 So, Mayor, would you like the public comment to happen first, or would you like an initial staff 685 00:54:05,780 --> 00:54:06,140 report? 686 00:54:08,140 --> 00:54:13,820 Let's do a staff report so that we can hear, because there was some language that was discussed 687 00:54:13,820 --> 00:54:19,000 last time about the I know the advocates here talking about preservation and I'm you probably 688 00:54:19,000 --> 00:54:22,740 have an update on that language and then they might have a suggestion so we can kind of 689 00:54:22,740 --> 00:54:29,700 try to see where we're at. So let's kick it off with the staff report then go to public 690 00:54:29,700 --> 00:54:31,840 testimony at the appropriate time. 691 00:54:32,040 --> 00:54:33,640 So take the way. 692 00:54:33,860 --> 00:54:38,680 All right thank you Mayor and counselors. So I've got Adrian Whitty with me again tonight. 693 00:54:38,680 --> 00:54:46,600 Adrian will be going through a short presentation, but we just wanted to recap the five items 694 00:54:46,600 --> 00:54:53,000 that Council asked the project team to address at your last work session on the seventh. 695 00:54:54,300 --> 00:54:58,660 Adrian and his team have updated maps to address the first three and then we are looking 696 00:54:58,660 --> 00:54:59,720 for feedback. 697 00:55:00,000 --> 00:55:15,000 Interaction from the council on the final two, which are potential language additions to the document itself. So I'll turn it over to Adrian. Adrian is just going to run through a quick presentation and get to the decision making process. 698 00:55:17,000 --> 00:55:20,040 Yeah, Adrian, we deal with tools on, good to see you all again. 699 00:55:20,560 --> 00:55:24,760 So from the meeting two weeks ago, if we go to the next, 700 00:55:25,020 --> 00:55:25,500 oh, we've got that. 701 00:55:28,120 --> 00:55:32,660 There are a few action items that you had asked us to address 702 00:55:32,660 --> 00:55:38,380 out of the session that we presented two weeks ago, 703 00:55:40,000 --> 00:55:45,320 including three map modifications of then two language changes. 704 00:55:45,320 --> 00:55:52,100 So those map modifications were to do with the floodplain boundary and planning commissions 705 00:55:52,100 --> 00:55:58,060 recommendation to use the 1996 flood boundary rather than the 100 year floodplain. 706 00:55:59,460 --> 00:56:05,140 Then to remove the specific language around the medium density residential currently 707 00:56:05,140 --> 00:56:10,900 in the planning stage in the Pond District and replace that with more generic language 708 00:56:10,900 --> 00:56:23,860 And adjust that area to be outside the flood boundary and then lastly to add those sort of ecological corridors to the district maps. 709 00:56:24,500 --> 00:56:40,380 And then we have some draft language related to the preservation, encouraging the preservation of these existing structures we would like some feedback on and also language around incorporating affordable housing language into the vision plant as well. 710 00:56:41,480 --> 00:56:49,520 So in terms of the map changes, they really impact maps in two of the districts, primarily the pond district. 711 00:56:54,340 --> 00:57:09,600 So the primary changes here in the area that you see above the lower pond, where we've changed the floodplain boundary to represent that 1996 level. 712 00:57:09,600 --> 00:57:18,360 and adjusted the nomenclature around that potential development area to remove the specific 713 00:57:18,360 --> 00:57:22,940 language on that and to remove it outside of that floodplain. 714 00:57:24,460 --> 00:57:32,180 We've also added some designation around the ecological corridor in that area as well. 715 00:57:35,180 --> 00:57:40,600 In the cultural heritage district, there's not really a major change here, but we did 716 00:57:40,600 --> 00:57:46,680 want to flag that the changing of the floodplain boundary just changes the plain boundary here 717 00:57:46,680 --> 00:57:50,720 in this district as well. So I just wanted to bring that to Council of Tension. There's no 718 00:57:50,720 --> 00:57:56,520 material difference in any of the recommendations or designations in this zone. 719 00:58:00,440 --> 00:58:03,120 Do you mind going back to slides? Yep. 720 00:58:04,220 --> 00:58:12,320 That one. Thank you. I was just looking up the current image to compare it. 721 00:58:12,320 --> 00:58:13,800 So, thank you. 722 00:58:14,100 --> 00:58:14,440 Yeah, no problem. 723 00:58:14,640 --> 00:58:15,240 Go ahead. 724 00:58:17,710 --> 00:58:24,870 In terms of learning changes, firstly, talking about encouraging preservation of historic structures, 725 00:58:25,610 --> 00:58:31,190 we wanted to flag this was in the meeting packet where there is existing reference to that 726 00:58:31,190 --> 00:58:38,110 in the document as well as some places where we could encourage more reference to that. 727 00:58:38,110 --> 00:58:48,430 So, in the document, the existing language around the goals on page 5, you know, mentioned supporting cultural and environmental stewardship, 728 00:58:49,710 --> 00:58:54,370 the guiding principles on pages 11 and 12 bringing in some of those elements as well, 729 00:58:55,130 --> 00:59:07,130 as does language in the planning framework, as well as in the district specific plans in the historic city hall district and in the cultural heritage district. 730 00:59:07,130 --> 00:59:12,930 So, those are the existing references, if you like, to encouraging preservation, 731 00:59:15,150 --> 00:59:37,110 but we are also bringing forward some additional language that would be added to the cultural heritage district planning framework as well, that would encourage preservation of those structures, and there's, and we've got several different options here for how though that could be structured. 732 00:59:37,130 --> 00:59:44,770 in terms of wording so adding a bullet to that section that would say something in the way of 733 00:59:44,770 --> 00:59:50,570 evaluate structures for historic significance and cultural integrity. It could say encourage 734 00:59:50,570 --> 00:59:57,810 rehabilitation and reuse of he historic structures where economically feasible could say support 735 00:59:57,810 --> 00:59:59,490 opportunities for rehabilitation. 736 01:00:00,000 --> 01:00:07,740 And reuse of historic structures. It could say work with private sector partners to identify key historic sites 737 01:00:07,740 --> 01:00:14,260 where rehabilitation and reuse would enhance visitor experience and support projects that showcase 738 01:00:14,260 --> 01:00:21,560 industrial heritage, or it could say encourage exploration of rehabilitation and reuse of 739 01:00:21,560 --> 01:00:27,720 so structures in partnership with property owners or some combination of those different variations. 740 01:00:32,660 --> 01:00:41,740 In terms of affordable housing, there is some reference to that in the document on page 23 741 01:00:41,740 --> 01:00:48,260 that talks about, you know, financing affordable housing in the market analysis and the 742 01:00:48,260 --> 01:00:54,260 challenges with that, but adding potential language to page 12, which is the guiding principles 743 01:00:54,260 --> 01:01:00,220 that would say something like river access key elements, encourage affordable housing development 744 01:01:00,220 --> 01:01:08,760 to ensure equitable access to the river. And then on page 37, which is the section on housing 745 01:01:08,760 --> 01:01:15,080 density and parking, a couple of options here would be to add language supporting new affordable 746 01:01:15,080 --> 01:01:20,220 housing projects potentially with tax increment financing funds could help meet the needs 747 01:01:20,220 --> 01:01:25,020 identified in the Westland housing capacity analysis that referencing things back to 748 01:01:26,100 --> 01:01:31,800 that housing capacity analysis and the need. It could say the city should consider allowing 749 01:01:31,800 --> 01:01:37,560 a variety of housing types to encourage affordability across income ranges and use targeting 750 01:01:37,560 --> 01:01:42,720 targeted infrastructure investments incentives and expedited permanent support development. 751 01:01:42,720 --> 01:01:56,260 So thinking about how affordable housing could be encouraged or it could say it will be important to work with private sector partners to identify opportunities for affordable housing development, which is maybe a little bit more broad. 752 01:01:58,820 --> 01:02:10,520 So, those are the changes being brought forward both map and wording, I'll sort of have a full discussion. 753 01:02:12,760 --> 01:02:16,820 Once somehow everything just shut off up here and I don't know if that. 754 01:02:17,900 --> 01:02:18,960 Maybe it goes. 755 01:02:18,960 --> 01:02:19,540 There it goes. 756 01:02:20,040 --> 01:02:23,780 We heard a sound and it was everything went like, oh no. 757 01:02:24,520 --> 01:02:25,420 Okay, we're back. 758 01:02:26,860 --> 01:02:30,240 Okay, you may continue. 759 01:02:30,680 --> 01:02:31,980 You might have been that day. 760 01:02:31,980 --> 01:02:32,960 I am a bien. 761 01:02:35,910 --> 01:02:39,790 Well, for the sake of process, 762 01:02:39,930 --> 01:02:41,710 let's just talk about this, 763 01:02:41,710 --> 01:02:43,690 the affordable housing language. 764 01:02:43,970 --> 01:02:46,610 Would you like us to kind of look at the language 765 01:02:46,610 --> 01:02:49,750 and kind of give direction on a particular option? 766 01:02:50,050 --> 01:02:51,830 The last one I'd like to hear from the community 767 01:02:51,830 --> 01:02:55,630 about the historic structures issue, 768 01:02:55,630 --> 01:02:58,590 but this one we might be able to just tackle real quickly. 769 01:02:59,030 --> 01:02:59,490 Councillor Groner. 770 01:03:00,570 --> 01:03:03,630 Yeah, I like the word encourage, which is positive. 771 01:03:03,910 --> 01:03:09,790 If that is kind of neutral, I don't think we can commit 772 01:03:09,790 --> 01:03:13,050 without understanding all the factors in the expenses. 773 01:03:14,090 --> 01:03:16,750 And I think we realistically do have to work with private 774 01:03:16,750 --> 01:03:20,050 owners as well, and so that should be part of the language. 775 01:03:20,430 --> 01:03:22,770 So I think it's the last of the options, 776 01:03:22,770 --> 01:03:24,670 bullet at options that I like. 777 01:03:30,590 --> 01:03:32,530 You talking about the third one here. 778 01:03:33,610 --> 01:03:36,410 There was one with bullets on various language. 779 01:03:36,930 --> 01:03:38,890 A couple earlier, I think. 780 01:03:39,070 --> 01:03:40,990 I think that one was relayed. 781 01:03:41,050 --> 01:03:41,730 Yeah, that one. 782 01:03:41,770 --> 01:03:44,610 Related to the preservation of historic structures. 783 01:03:45,230 --> 01:03:50,870 Yeah, but I think something similar for local lower costs or affordable housing as well. 784 01:03:50,930 --> 01:03:57,150 Do you have thoughts on the affordable housing bullets that were these potential language choices? 785 01:03:57,150 --> 01:04:03,210 And then I will turn to the historic structures, agree with you on the 786 01:04:03,210 --> 01:04:03,670 Anchorage. 787 01:04:05,890 --> 01:04:25,690 I would propose the second line here, just changing it to say, 788 01:04:25,690 --> 01:04:32,310 should encourage the city should encourage a variety of housing types to encourage affordability 789 01:04:32,310 --> 01:04:35,550 across income rates and use this targeted infrastructure investments and then have an 790 01:04:35,550 --> 01:04:40,230 expedited permanent support development. Of course, it's an aspirational statement, but it's 791 01:04:40,230 --> 01:04:47,810 whatever, whatever. Everybody okay with that type of language? I agree with that. I was kind 792 01:04:47,810 --> 01:04:53,910 of looking at that one in connection with the other, but how specific do we want to be in this 793 01:04:53,910 --> 01:04:59,790 Vision process, I think, acknowledging that we will encourage. 794 01:05:00,050 --> 01:05:08,950 A variety of housing types at various affordability levels, I think is important. So I kind of like the middle one maybe word Smith the little. 795 01:05:12,500 --> 01:05:13,980 Any other? 796 01:05:15,360 --> 01:05:19,360 That's cut two counselors, but I want to hear from everybody. It counts as a bomb burner. 797 01:05:19,680 --> 01:05:30,740 Thank you. I think the second wording is fine. I think it does need to be. At this point, a little bit more general. 798 01:05:30,740 --> 01:05:38,720 and this does that and includes the elements that we're hearing about and that we've 799 01:05:38,720 --> 01:05:40,960 been talking about that we want to prioritize. 800 01:05:44,580 --> 01:05:49,640 So I would agree with so far what you all said. 801 01:05:50,660 --> 01:05:52,640 Councillor Bontina, see you nodding? 802 01:05:55,120 --> 01:05:55,940 I agree with them. 803 01:05:56,080 --> 01:05:57,840 The more general and these things, the better. 804 01:05:59,640 --> 01:06:03,280 It's too early to try and be that specific, I guess. 805 01:06:04,120 --> 01:06:04,320 Thanks. 806 01:06:05,000 --> 01:06:06,580 And I think Councillor Groner, you were an agreement. 807 01:06:06,820 --> 01:06:07,900 I would say to your agreement earlier. 808 01:06:07,900 --> 01:06:10,940 Really positive, but not commit to anything. 809 01:06:11,260 --> 01:06:11,680 Thank you. 810 01:06:12,360 --> 01:06:12,680 Councillor Brey. 811 01:06:13,600 --> 01:06:19,620 Just looking at it, how about the city should allow a variety of housing types? 812 01:06:19,620 --> 01:06:26,480 we haven't done the zoning and so the zoning would initiate various housing types so kind of take out the 813 01:06:26,480 --> 01:06:33,280 Consider allowing and just they should allow and then that paragraph. I think states what we're trying to present. 814 01:06:34,840 --> 01:06:45,520 Exense. Okay, so I thought we would tackle that potential change. We've done that and so now we will turn to the 815 01:06:47,080 --> 01:06:56,000 historic preservation issue, and I would like to take public testimony at this point, if that's okay with 816 01:06:56,400 --> 01:07:01,760 presenters at this time. Okay, how many folks do we have signed up? I see we've got to look at it. 817 01:07:03,100 --> 01:07:04,600 Just two. Okay, 818 01:07:10,180 --> 01:07:10,640 Dan Butler. 819 01:07:14,310 --> 01:07:17,050 Okay, I come on up, whoever would like to come on up for. 820 01:07:24,140 --> 01:07:31,020 Welcome and I got your slide show and I heard you might need to go a little bit over three minutes and that's totally fine 821 01:07:31,980 --> 01:07:36,780 Okay, so welcome and just at your names and city of residences and take it away. 822 01:07:36,780 --> 01:07:40,420 I'm Dan Butler. I live in the Clacamus in the shadow of Mount Albert. 823 01:07:41,260 --> 01:07:43,440 I'm a really a Rebecca. I live in Westland. 824 01:07:44,660 --> 01:07:56,640 So, we come from the Advocates of Limit Falls heritage and our President Troy Powers sent you this email and I'm just going to read it really quickly and that might go through some of these slides. 825 01:07:57,660 --> 01:08:07,620 As you know, we, the Advocates for Limit Falls heritage, continue to proactively assure that the history of Wesleyan community around the Falls is not lost as the city grows when it comes home to future generations. 826 01:08:07,620 --> 01:08:13,760 The waterfront, vision plan will play an important role in determining the future of the area around the falls. 827 01:08:14,060 --> 01:08:23,440 The vision plan offers the City Council the opportunity to incorporate elements of Wesleyan's rich waterfront history, including its industrial heritage into the waterfront's future. 828 01:08:24,080 --> 01:08:31,680 Because our mission and involvement, advocates has considerable knowledge about more as island, the limit, locks, and the area covered by the vision plan. 829 01:08:31,680 --> 01:08:37,400 We do not encourage for saving all or a majority of build structures and industrial artifacts. 830 01:08:37,960 --> 01:08:44,540 We do request the vision play and clearly encourage the preservation or reuse of some of the built structures and industrial artifacts. 831 01:08:44,980 --> 01:08:53,480 We would like to share with you pictures of some of the existing treasures and a couple of concepts that we purpose and industrial elements to preserve the heritage of the area. 832 01:08:53,900 --> 01:09:00,060 We think incorporating such concepts into the vision play and will be instrumental in highlighting possibilities opportunities and expectations. 833 01:09:00,060 --> 01:09:04,740 Thank you for your continued consideration support on behalf of the Advocate Stripe Powers. 834 01:09:05,200 --> 01:09:07,160 This is sort of redundant as what we just saw. 835 01:09:07,280 --> 01:09:11,860 You guys have some great ideas for changing some of the language. 836 01:09:12,100 --> 01:09:15,320 So this is just a sort of underlying that point. 837 01:09:16,660 --> 01:09:21,260 So to introduce myself and Dan, I'm a resident here and I grew up in Westland. 838 01:09:21,580 --> 01:09:26,120 I have an architecture degree from PSU and I also work in architecture for a long time. 839 01:09:26,120 --> 01:09:31,660 Dan is an industrial photographer and for the past 10 years he's been touring more as island 840 01:09:31,660 --> 01:09:38,420 extensively with former employees and he has a wealth of knowledge about the goings on and the 841 01:09:38,420 --> 01:09:39,600 intricacies of the area. 842 01:09:45,150 --> 01:09:48,450 Okay well what we have this is what we have and it's somewhat misleading 843 01:09:48,450 --> 01:09:55,970 and that we have a whole lot more but I think this is a little restippant of some of the areas in the mill 844 01:09:55,970 --> 01:09:59,970 that, frankly, a lot of bill employees have not seen and land on it. 845 01:10:00,000 --> 01:10:05,820 Peter P. G. has not seen. Picture here on the left is grinder room number 3. This is where 846 01:10:05,820 --> 01:10:12,820 they used water power to grind wood into fiber. Paper making. It was one of the two methods 847 01:10:12,820 --> 01:10:20,320 they used. And this is a big structure that it's out closest to the falls. To the right shows 848 01:10:20,320 --> 01:10:27,030 it's almost a cathedral-like space where the big 13-foot pinstocks come from the face of the 849 01:10:27,030 --> 01:10:43,050 to the turbines to spend the grinders, and these were very unique spaces, and have a lot of potential for multiple uses, and it's truly one of the treasures within the mill. 850 01:10:43,050 --> 01:10:43,050 What's 851 01:10:48,330 --> 01:10:49,510 the right way? 852 01:10:50,090 --> 01:10:50,930 I got those on the way. 853 01:10:53,460 --> 01:10:53,740 Thank you. 854 01:10:54,300 --> 01:10:54,380 Okay. 855 01:10:55,520 --> 01:11:02,700 Moving to the lower part of the island on the left is in Milby the base of the digesters. 856 01:11:02,780 --> 01:11:06,980 This is where they use chemical process to cook the pulp. 857 01:11:08,160 --> 01:11:10,220 And they're essentially big pressure covers. 858 01:11:10,820 --> 01:11:12,720 And that process stopped in 1968. 859 01:11:13,520 --> 01:11:17,980 These four story high digesters are what you use to smell. 860 01:11:17,980 --> 01:11:24,040 the bad smell of paper-making operation was a sulfide process, and I can say that discontinued 861 01:11:24,040 --> 01:11:29,400 1968, but the structures and the digestors remain. The one on the right is an acid 862 01:11:29,400 --> 01:11:34,800 accumulator, but it's, they're most of the show, some of the views that you can see from 863 01:11:34,800 --> 01:11:36,720 the various structures on the site. 864 01:11:40,590 --> 01:11:43,970 This is still in mil B, that's on the left, is towards 865 01:11:43,970 --> 01:11:50,470 the top of the digester. Again, this is like a big thermospodel, four-story, high thermospodel. 866 01:11:51,430 --> 01:11:55,430 to the right, that is the top of the digesters, where the 867 01:11:55,430 --> 01:11:57,490 winch ships would fall in and they would cook it for about 868 01:11:57,490 --> 01:11:58,970 eight hours under pressure. 869 01:12:00,130 --> 01:12:03,070 And looking at how the windows, this is about half 870 01:12:03,070 --> 01:12:05,350 we have the big structure of this right next to the 871 01:12:05,350 --> 01:12:06,030 small stack. 872 01:12:06,390 --> 01:12:10,070 The area above this is filled with winch ships or was. 873 01:12:12,600 --> 01:12:14,320 Okay, almost like that. 874 01:12:15,140 --> 01:12:19,520 I just wanted to juxtapose that digester that we have with 875 01:12:19,520 --> 01:12:24,620 project in San Antonio, Texas. This is the stern worth, which is the bar inside the hotel 876 01:12:24,620 --> 01:12:33,920 Emma, which sits inside what the former Pearl Brewing building that was built in 1894. 877 01:12:35,280 --> 01:12:39,180 Here you can see the beer tanks have been playfully repurposed into seating booths for the bar 878 01:12:39,180 --> 01:12:42,100 and restaurant. I'm going to read a little bit from the hotel's website. 879 01:12:42,660 --> 01:12:46,420 When you visit hotel Emma, you'll see the industrial artifacts respectfully and sometimes 880 01:12:46,420 --> 01:12:50,000 intrinsically incorporated into graciously design spaces. 881 01:12:50,540 --> 01:12:52,900 A sweet ceiling is the bottom of the cast iron hopper. 882 01:12:53,500 --> 01:12:56,880 An early 20th century compressor has been retired to the lobby 883 01:12:56,880 --> 01:12:59,360 and solid bronze industrial gadgets are 884 01:12:59,360 --> 01:13:00,800 repurposed as lighting fixtures. 885 01:13:01,160 --> 01:13:04,620 The brewery's tangible history is taking on new life at Hotel Emma. 886 01:13:06,340 --> 01:13:09,180 So I personally visited this project and it's incredible. 887 01:13:10,560 --> 01:13:13,440 There's a couple other just sort of inspopex. 888 01:13:13,440 --> 01:13:20,920 Um, this one on the left is the coming needs brewery, it's in an original brewery building built in 1860 in the Czech Republic. 889 01:13:21,440 --> 01:13:26,780 It was used as a warehouse after brewering operations cease after World War II. 890 01:13:27,240 --> 01:13:30,960 In 2016, it's been bought and turned into a brewery again. 891 01:13:31,800 --> 01:13:39,260 On the right, we see Empire stores, which is a mixed use adaptor reuse project on the formerly industrial waterfront in Brooklyn, New York. 892 01:13:39,340 --> 01:13:41,640 Which is pretty similar to what we have here. 893 01:13:41,640 --> 01:13:47,840 The architects are called S9 and this little bit from the website says S9's sympathetically 894 01:13:47,840 --> 01:13:53,300 joined 7 separate historic buildings and added an additional 2.5 floors to create a new 895 01:13:53,300 --> 01:13:58,020 public space that celebrates and preserves the area and dust real past while establishing 896 01:13:58,020 --> 01:13:59,840 a new community hub. 897 01:14:01,900 --> 01:14:04,660 I'm sorry, what was that originally? 898 01:14:06,400 --> 01:14:10,200 I don't know originally what it is, there were 7 buildings, so there was less 899 01:14:10,200 --> 01:14:11,860 different functions on that area. 900 01:14:15,750 --> 01:14:19,710 And this is a more local project elected, do you want to talk about it, Dan? 901 01:14:19,770 --> 01:14:22,350 Yes, as you see, Seattle, excuse me, the Spokane 902 01:14:22,350 --> 01:14:27,030 steam plant on the left, which was in the right and downtown Spokane, 903 01:14:27,110 --> 01:14:29,010 powered a lot of buildings in Spokane. 904 01:14:29,290 --> 01:14:32,270 It was decommissioned and set idle for many years, 905 01:14:32,530 --> 01:14:36,190 and has now been repurposed into both of hotel and restaurant. 906 01:14:36,310 --> 01:14:39,030 And you can see on the right what they've done to incorporate 907 01:14:39,030 --> 01:14:45,570 a lot of those entities and artifacts of the original structure and to a very attractive and 908 01:14:45,570 --> 01:14:46,790 functional facility. 909 01:14:48,710 --> 01:14:53,710 Okay, so just in conclusion what we're asking for is to strongly encourage and incentivize 910 01:14:53,710 --> 01:14:58,350 and adapt to reuse the approach that turns some of the embedded energy and strong visual historic 911 01:14:58,350 --> 01:14:59,890 elements in the existing. 912 01:15:04,610 --> 01:15:15,030 Thank you. Thank you, Mayor. Thank you so much for being here and I want to thank also the other. Other advocates behind you there that have been part of the process for a long time. 913 01:15:15,030 --> 01:15:21,370 including a couple of former city counselors, Jim, and Joe D. Nice to see you both. Welcome back to the chamber. 914 01:15:22,830 --> 01:15:29,830 I think the historic preservation is very important to us, so I will get into the specific language in just a few minutes, 915 01:15:30,030 --> 01:15:37,010 but we really appreciate the examples and photos, and it would be so cool to see something like that in the future at the falls. 916 01:15:37,010 --> 01:15:42,490 I know we've been dealing with the tension of not restricting the private sector to the 917 01:15:42,490 --> 01:15:47,090 point where nothing can happen but making sure that we can do something to see where 918 01:15:47,090 --> 01:15:47,930 we use can happen. 919 01:15:48,450 --> 01:15:56,170 So, we will discuss momentarily here on any other questions or comments for the advocates. 920 01:15:57,910 --> 01:15:58,590 Councillor Groner. 921 01:15:58,730 --> 01:16:00,590 Yeah, a couple of observations. 922 01:16:01,270 --> 01:16:05,430 One, it seems most of your examples are in downtown areas and I think more as island 923 01:16:05,430 --> 01:16:14,090 has some real problems with access, just a comment, but the other is who would be doing the 924 01:16:14,090 --> 01:16:19,010 investing to do these rehabilitation? Do you have any thoughts on that? 925 01:16:19,430 --> 01:16:23,970 I think that would come down the line to him Edwards has a lot of experience in this. 926 01:16:24,370 --> 01:16:29,150 He's a urban planner and so there's lots of options. 927 01:16:31,190 --> 01:16:32,150 Thank you. 928 01:16:32,370 --> 01:16:36,990 I think that would be when talking in the form of government around on the trust and engagement 929 01:16:36,990 --> 01:16:41,130 process that they're going to have, I think this is the type of thing that we can talk 930 01:16:41,130 --> 01:16:45,070 about as she's doing fundraising and that group is working hard on that, making sure 931 01:16:45,070 --> 01:16:49,870 that there's some advocates for reuse wherever possible would be great. 932 01:16:50,390 --> 01:16:52,470 This is basically our dream for your vision. 933 01:16:52,830 --> 01:16:53,990 I think we can talk about it. 934 01:16:53,990 --> 01:17:00,950 No, absolutely, we definitely appreciate that and like I said, be awesome to see those sorts of 935 01:17:00,950 --> 01:17:05,510 brewery like that sometime on the right near the falls. Do you have a comment? 936 01:17:06,790 --> 01:17:08,190 Councillor President Baumgren, go ahead. 937 01:17:08,470 --> 01:17:14,210 Thanks, Mayor. Yeah, so thank you for the engagement and also the information. 938 01:17:15,790 --> 01:17:22,350 My concern about this area is the reason why I started coming to council meetings originally six or eight 939 01:17:22,350 --> 01:17:27,050 years ago or however long ago was, is the toxins that are present in these sites. 940 01:17:28,390 --> 01:17:32,930 So a brewery is a different type of use than a paper mill. 941 01:17:34,650 --> 01:17:44,410 And a steam plant is a similar way as a different use that didn't have the level of chemical use. 942 01:17:44,410 --> 01:17:55,910 And so those are the concerns I have is the cost to make safe a building that was used with such toxins present. 943 01:17:56,430 --> 01:18:09,450 So I think that's going to be our big challenge with this whole area is how to be able to repurpose it reasonably, financially, reasonably. 944 01:18:09,450 --> 01:18:18,490 So I'm not against saving buildings or I'm just being realistic about the possibilities 945 01:18:18,490 --> 01:18:29,770 and not wanting to restrict what we can do with some with a preservation kind of restriction on it. 946 01:18:30,150 --> 01:18:35,630 But not every building, maybe some of the buildings that were not used with, you know, 947 01:18:35,630 --> 01:18:44,850 not in such close proximity to toxic functions that certainly a possibility, but I appreciate 948 01:18:44,850 --> 01:18:47,790 all of your work and diligence on this. 949 01:18:48,230 --> 01:18:50,110 Thank you. 950 01:18:50,770 --> 01:18:54,710 Any other comments for the advocates at Councillor Bonnet and go ahead? 951 01:18:55,150 --> 01:18:55,390 Yeah. 952 01:18:55,870 --> 01:18:59,530 I've been strong agreement with what Council President said there. 953 01:18:59,530 --> 01:19:08,790 I guess I would be supportive of something to the effect of encouraging adaptive repurposing 954 01:19:08,790 --> 01:19:14,370 as you called it to the extent that it's not going to become cost prohibitive to the 955 01:19:14,370 --> 01:19:17,630 property owners who end up developing it. 956 01:19:18,030 --> 01:19:23,930 It's great and very to think about some of this being preserved in that way, but if it 957 01:19:23,930 --> 01:19:28,210 sinks the entire project and it ends up continuing to sit unused as it is, that would 958 01:19:28,210 --> 01:19:34,290 a tragedy. So we need to strike a balance there for what we're trying to accomplish without 959 01:19:34,290 --> 01:19:36,290 voiling the entire thing. 960 01:19:38,570 --> 01:19:40,730 Good comments. Councillor Groner. 961 01:19:40,970 --> 01:19:44,490 Yeah, I can open Pittsburgh, Pennsylvania. And there have been some really creative 962 01:19:44,490 --> 01:19:49,830 reuses of old railroad stations in Pittsburgh that have basically been turned either into office 963 01:19:49,830 --> 01:19:56,230 buildings or basically shopping malls. But both of them had easy access on the city. 964 01:20:00,000 --> 01:20:07,900 Any other questions for the advocates or may we let them go back to? Okay. Well, thank you for coming and presenting. 965 01:20:08,300 --> 01:20:16,020 Thank you. And we will now engage in our review of these proposed language from our staff. 966 01:20:18,020 --> 01:20:18,020 And 967 01:20:21,160 --> 01:20:26,680 with it, language in mind that the advocates also presented about encouraging some adaptive reuse. 968 01:20:29,580 --> 01:20:32,800 Yes, that'd be helpful if you put there are the bullets right there. 969 01:20:37,820 --> 01:20:38,900 It came off somehow. 970 01:20:38,900 --> 01:20:40,380 I don't know how that happened. 971 01:20:43,960 --> 01:20:44,340 Oh, Chris. 972 01:20:47,860 --> 01:20:50,060 Miss Solberg, would you like to make a comment? 973 01:20:52,420 --> 01:20:52,680 Welcome. 974 01:20:53,240 --> 01:20:53,420 Sorry. 975 01:20:53,720 --> 01:20:56,220 I didn't know you had maybe there was confusion on the form. 976 01:20:56,580 --> 01:20:58,320 I'm glad you flagged us before we moved on. 977 01:20:58,720 --> 01:20:58,740 Please. 978 01:20:59,240 --> 01:21:03,060 From the historic review board, the steam chair I'd go ahead. 979 01:21:03,060 --> 01:21:03,300 Go ahead. 980 01:21:03,520 --> 01:21:04,740 Thank you. 981 01:21:04,740 --> 01:21:07,140 I had emailed with Lynn. 982 01:21:07,320 --> 01:21:09,560 I didn't realize there was an extra step to take care. 983 01:21:09,760 --> 01:21:11,360 So my name is Kirsten Solberg. 984 01:21:11,480 --> 01:21:12,800 I'm a Westland resident. 985 01:21:13,560 --> 01:21:17,220 I'm an architect with my business based in Westland. 986 01:21:17,360 --> 01:21:19,540 I'm also a member of the Historic Review Board, 987 01:21:19,620 --> 01:21:21,760 but I'm not here to speak in that capacity. 988 01:21:22,440 --> 01:21:25,280 I have a handful of comments about the waterfront plan. 989 01:21:25,380 --> 01:21:27,500 I'm not connected with the adaptive, 990 01:21:28,100 --> 01:21:30,960 or the group that just spoke advocacy, 991 01:21:30,960 --> 01:21:39,980 but I am a huge proponent of adaptive reuse, I admit that access over a lock is definitely 992 01:21:39,980 --> 01:21:45,760 challenging but that is a building that maybe people don't realize how amazing it can be but 993 01:21:45,760 --> 01:21:54,540 it is worth trying to preserve and reuse and treasure. There are examples of paper mills that 994 01:21:54,540 --> 01:22:01,140 have had successful adaptive reuse projects in Danville, Virginia, and in Maine. 995 01:22:01,820 --> 01:22:06,100 There's textile mills in Pennsylvania, Rhode Island, and Massachusetts. 996 01:22:06,680 --> 01:22:11,860 One of the most interesting ones I saw was in a floodplain and also incorporated a trail 997 01:22:11,860 --> 01:22:18,640 that encompassed the history, and I'd like to follow up with some of these images to share 998 01:22:18,640 --> 01:22:22,700 with you later this week, and links if you want to learn more about those projects. 999 01:22:23,640 --> 01:22:39,900 The next thing I wanted to say is that during the Planning Commission meeting, when there was discussion about toxins in the wetlands area and also the supplies to Moors Island, it would be nice to know who is our contact person in the city. 1000 01:22:40,980 --> 01:22:51,760 In the event that we can get these areas cleaned up, it seemed to be unknown about who's who's the contact person and whether or not these areas will be cleaned up. 1001 01:22:51,760 --> 01:22:57,020 If we don't deal with the toxins now, it's just going to cause problems down the road. 1002 01:22:57,980 --> 01:22:58,880 And I haven't seen the report. 1003 01:22:58,960 --> 01:23:03,940 I don't know what the contamination is, but with a background in architecture and life safety and welfare. 1004 01:23:05,000 --> 01:23:11,460 Like, you know, bad stuff happens, and the longer you kick the hand down the road, the harder it is to take care of. 1005 01:23:12,020 --> 01:23:19,500 And then the last thing I wanted to mention is that the language about citing the 1996 floodplain. 1006 01:23:19,500 --> 01:23:24,740 I would like to, instead, suggest referring to the FEMA floodplain documents. 1007 01:23:25,360 --> 01:23:31,160 That considers not just the 96 flood, but all floods and all projected floods. 1008 01:23:32,820 --> 01:23:36,580 It has information about base flood elevations in it. 1009 01:23:36,800 --> 01:23:43,600 And just for example, the base flood elevation, if you build below the base flood elevation, 1010 01:23:44,060 --> 01:23:46,720 you have to follow FEMA design guidelines. 1011 01:23:47,500 --> 01:23:54,240 normal materials for a standard home or commercial project can't be used below that 1012 01:23:54,240 --> 01:23:55,520 base flood elevation. 1013 01:23:58,020 --> 01:24:01,440 Installation. Gip board that has a paper face on it. A whole bunch 1014 01:24:01,440 --> 01:24:06,020 of items can't be used below there. It can't be a habitable space. So for instance on 1015 01:24:06,020 --> 01:24:11,160 the, I've a print out of the FEMA flood zone for these areas that we're discussing and 1016 01:24:11,160 --> 01:24:18,680 include that in the information I send later, at Burnert Landing, the base blood elevation is 75 feet, 1017 01:24:19,880 --> 01:24:25,800 on Moore's Island, it's between 69 and 49 feet, and then for instance, at the Cedarot Boat 1018 01:24:25,800 --> 01:24:33,780 Boat Landing, the elevation in the flood plains that you can build above and have a normal habitable space, 1019 01:24:33,900 --> 01:24:40,600 or commercial space, is 46 feet. And jurisdictions I've worked in, it's a pretty rigorous process 1020 01:24:40,600 --> 01:24:45,280 where the drawings are scrutinized to make sure they comply with design guidelines. 1021 01:24:46,520 --> 01:24:52,820 There are pre and post-construction, professional survey reports that are submitted to make 1022 01:24:52,820 --> 01:24:54,580 sure it's complied with. 1023 01:24:55,140 --> 01:24:59,980 And it has repercussions for whether or not a jurisdiction can have access to the next 1024 01:25:00,000 --> 01:25:13,780 National Flood Insurance Program. It just seems like it's such an important document. Anything that has to be built needs to comply with it. It seems like that's the document that should be used for making some of these big decisions. 1025 01:25:14,580 --> 01:25:20,380 I thought it would also mention that municipalities that don't comply, 1026 01:25:22,760 --> 01:25:27,700 they can be put on probation or suspended from the Flood Insurance Program, 1027 01:25:27,700 --> 01:25:33,300 which is very bad for a municipality and it can also interfere with jurisdictions receiving 1028 01:25:33,300 --> 01:25:36,780 FEMA or state disaster aid. 1029 01:25:37,280 --> 01:25:43,760 So please share that map with us and the information you just mentioned and we'll have 1030 01:25:43,760 --> 01:25:45,840 our planning staff take a look at that. 1031 01:25:46,220 --> 01:25:46,780 I'd be happy to. 1032 01:25:46,840 --> 01:25:47,700 Before the next. 1033 01:25:48,420 --> 01:25:51,400 It works the next the adoption meeting and if we have to make a change. 1034 01:25:53,740 --> 01:25:57,680 Thank you and thank you for your comments on the historic preservation and 1035 01:25:57,680 --> 01:26:02,020 and all that you do for the Historic Review Board as well. 1036 01:26:02,580 --> 01:26:04,960 Look forward to reviewing that when you send it over tonight. 1037 01:26:07,020 --> 01:26:07,200 Okay. 1038 01:26:09,300 --> 01:26:12,300 Back to the issue at hand, which is the President, 1039 01:26:12,560 --> 01:26:18,140 I would say here we have kind of a breakdown of the existing language 1040 01:26:18,140 --> 01:26:25,260 just showcasing that there is some preservation language in the plan 1041 01:26:25,260 --> 01:26:30,060 and we could transition to the, oh, there's another more language, okay? 1042 01:26:30,480 --> 01:26:33,240 And there's some potential language. 1043 01:26:33,900 --> 01:26:37,080 Now, we've got five options for a city council to choose from. 1044 01:26:37,520 --> 01:26:40,240 How does a city council narrow it down to one? 1045 01:26:41,080 --> 01:26:44,480 It a timely manner with five good people up here. 1046 01:26:45,140 --> 01:26:46,480 A council or break has a thought. 1047 01:26:47,300 --> 01:26:51,220 I would eliminate the first bullet because evaluating structures 1048 01:26:51,220 --> 01:26:54,520 doesn't have an action item associated with that. 1049 01:26:54,520 --> 01:27:01,180 It's just look at them and I think we need to be a little bit more specific about encouraging 1050 01:27:01,180 --> 01:27:05,680 the rehabilitation or those kinds of things. 1051 01:27:06,000 --> 01:27:10,580 I would almost propose, I agree with that, I'd almost propose a combination hybrid of 1052 01:27:10,580 --> 01:27:16,660 bullet point two and four because you're encouraging rehabilitation reuse of key structures 1053 01:27:16,660 --> 01:27:21,580 where economically feasible and work with private sector partners to identify sites where we 1054 01:27:21,580 --> 01:27:26,140 have been reused with enhanced visitor experience and support projects that showcase the heritage. 1055 01:27:26,760 --> 01:27:29,520 That merger is almost exactly bullet five. 1056 01:27:29,760 --> 01:27:38,820 Oh, the. Okay. So what do you, what do you guys think of what I, I don't 1057 01:27:38,820 --> 01:27:46,940 prepare? Yeah, I think the element of five that was missing from that one is identifying 1058 01:27:46,940 --> 01:27:55,600 which what ones are the key historic ones, so that I don't know some of that those resources aren't going into the wrong areas. 1059 01:27:56,640 --> 01:28:04,940 And then encourage the private property owners through whatever means we have whatever incentives we have to work on this. 1060 01:28:05,780 --> 01:28:06,720 Thank you. 1061 01:28:06,940 --> 01:28:07,460 For that. 1062 01:28:07,700 --> 01:28:08,860 Thanks for that, Councillor Groner. 1063 01:28:09,040 --> 01:28:10,260 Councillor Bracky, have done a thought. 1064 01:28:10,840 --> 01:28:16,440 And I think also in the wordsmithing I really liked the language that the advocates had in their last slide. 1065 01:28:16,440 --> 01:28:22,500 that seemed very concise, specifically said what we were hoping to do, and so if we can incorporate 1066 01:28:22,500 --> 01:28:29,140 that language into our statement, I think that would be good, at least a portion of it. 1067 01:28:29,600 --> 01:28:35,540 So it sounds like there's some agreement among key themes on what we'd like the final 1068 01:28:35,540 --> 01:28:41,600 language to say, maybe reflecting some of what was in the advocates statement, just encouraging 1069 01:28:41,600 --> 01:28:42,940 adaptive reuse. 1070 01:28:42,940 --> 01:28:57,960 They had the plane was strongly encouraging and then maybe we could take a stab at based on the council discussion coming up with a bullet point that kind of captures the partnership with property owners, that you know the key of the importance of the private sector. 1071 01:28:59,720 --> 01:29:07,940 And, you know, the economically feasible element because that's another key that I heard from the discussion from council's bottom tin and growner. 1072 01:29:08,720 --> 01:29:10,240 So that makes sense. 1073 01:29:10,920 --> 01:29:18,060 We'll trust you all to draft something up and you could even send it out to the City Council at some point. 1074 01:29:22,680 --> 01:29:27,980 Yeah, we can draft a couple of options for you and send it out to you. 1075 01:29:28,020 --> 01:29:29,820 In advance of you. 1076 01:29:30,420 --> 01:29:34,820 I have a chance to look over it and on it. 1077 01:29:36,040 --> 01:29:36,560 Okay. 1078 01:29:39,500 --> 01:29:44,200 That makes sense and I think it reflects that we're, we're, we're, we hear the advocates 1079 01:29:44,200 --> 01:29:44,720 testimony. 1080 01:29:44,980 --> 01:29:50,040 We want to make sure that the plan reflects your values, which I think are our shared values 1081 01:29:50,040 --> 01:29:55,260 as well from the historic preservation and reuse wherever economically feasible. 1082 01:29:56,160 --> 01:29:59,680 So that kind of handles the two issues, go ahead, Darren. 1083 01:30:00,000 --> 01:30:10,420 I do want to just ensure council knows that what Miss Solberg talked about with the building materials and the review process. 1084 01:30:10,560 --> 01:30:18,180 That is all part of the city's current process if you're going to develop in the floodplain. So we have all those rules in place in the community development code. 1085 01:30:19,040 --> 01:30:26,380 The building official ensures any development in the floodplain meets the standards. So the city's already doing that. 1086 01:30:26,380 --> 01:30:29,520 So it's, it's, it's, it's, it's, thank you for pointing that out. 1087 01:30:29,680 --> 01:30:37,140 And if, if, if, if if, if, if, if, if, if, if, if, if, if, if, if, if, if, if another map comes in that has a different line that may be made made make more so we can review that and take a look at that. 1088 01:30:37,460 --> 01:30:49,620 Yeah, it's, it's, it's, uh, it's the property owners responsibility to establish the, the floodplain elevation and then provide the drawings that show whether the building is above or below the floodplain elevation. 1089 01:30:49,940 --> 01:30:54,260 So just just so the community knows that that's, that's taking place in the city of Westline. 1090 01:30:54,260 --> 01:31:01,110 Thank you, thank you very much for that and before we so I think that kind of addresses the main 1091 01:31:01,660 --> 01:31:07,270 Couple of things that you had from your slideshow for potential changes and I just we did want to take a moment to 1092 01:31:08,860 --> 01:31:15,260 Address some of the public the public comment that came in that we've received from a few folks and I 1093 01:31:15,260 --> 01:31:19,620 I just have been thinking about that because at the last city council meeting 1094 01:31:19,620 --> 01:31:25,200 And this is in relation to the map and the delineation and the pond district that shows 1095 01:31:25,200 --> 01:31:30,320 some potential development area, south of Fifth Avenue, and I wanted to clarify what's 1096 01:31:30,320 --> 01:31:32,880 going on with that, and the shading on the map. 1097 01:31:33,200 --> 01:31:38,980 That yellow color is used across the entire waterfront, basically, to show areas that are technically 1098 01:31:38,980 --> 01:31:41,480 developable, meaning that they're outside of the floodplain. 1099 01:31:42,040 --> 01:31:47,660 It does not mean that housing or any other kind of development is planned or encouraged there. 1100 01:31:47,660 --> 01:31:53,840 And at the October 7th City Council meeting, I raised the issue with the Council of whether we should 1101 01:31:53,840 --> 01:31:59,720 remove the yellow shading, South Fathau, New or remove the language that was said medium 1102 01:31:59,720 --> 01:32:04,740 residential and in the planning stages, and we, the Council decided we're going to remove 1103 01:32:04,740 --> 01:32:07,560 the language on a medium density residential. 1104 01:32:08,400 --> 01:32:12,740 And then when we talked about the map and the planning staff recommended that we keep that 1105 01:32:12,740 --> 01:32:18,340 place for consistency across the entire waterfront plan. 1106 01:32:19,300 --> 01:32:24,400 And so I just want to be clear that whether that area is yellow or not has nothing to 1107 01:32:24,400 --> 01:32:27,400 do with whether a development could or couldn't occur there. 1108 01:32:27,420 --> 01:32:28,720 And I think we heard that tonight. 1109 01:32:29,740 --> 01:32:36,740 But the city council was in charge of that and directed that that was how the area should 1110 01:32:36,740 --> 01:32:38,360 appear on the map at the last meeting. 1111 01:32:38,360 --> 01:32:44,180 And I want to thank the planning staff and our consultant for your professionalism and work and 1112 01:32:44,180 --> 01:32:44,480 doing that. 1113 01:32:44,560 --> 01:32:49,960 There were some criticism of the planning department because of that that map continued 1114 01:32:49,960 --> 01:32:57,680 to show the yellow over that South of Fifth Avenue property, but that was from my perspective, 1115 01:32:58,000 --> 01:33:04,280 a council decision or really, the council did not object at the time last week or two weeks ago 1116 01:33:04,280 --> 01:33:09,040 to that provision and you all are doing a great job, bringing forward what we are asking 1117 01:33:09,040 --> 01:33:09,960 you to. 1118 01:33:10,100 --> 01:33:14,420 And I am willing to open up the conversation to the Council, just for a final check. 1119 01:33:14,880 --> 01:33:20,820 If folks have any final comments on the plan, the map, I know the Council really does support 1120 01:33:20,820 --> 01:33:25,580 wetland preservation, it's part of the plan, and there's just seems to be a hang up over 1121 01:33:25,580 --> 01:33:31,480 that last little part of the map, but I really don't want that to be something that makes 1122 01:33:31,480 --> 01:33:38,860 a really negative adoption hearing, even though it's something that, you know, is just showing 1123 01:33:38,860 --> 01:33:44,460 developable area that's technically developable under city zoning code, that's it. 1124 01:33:45,520 --> 01:33:48,220 So it's not an endorsement by the city council. 1125 01:33:48,380 --> 01:33:52,560 The endorsement was taken out because we took out the medium residential and the planning 1126 01:33:52,560 --> 01:33:57,340 stage is language last week and not that that wasn't endorsement. 1127 01:33:57,640 --> 01:33:59,300 But just that potential tilt. 1128 01:33:59,300 --> 01:34:03,360 any thoughts from the Council? I thought Councillor Brack and then the Council of 1129 01:34:03,360 --> 01:34:09,300 Bonnie and Ten has a comment. I kind of want to jump in a little bit to the 1130 01:34:09,300 --> 01:34:14,500 concerns raised about the Ponds and my understanding is that there are various 1131 01:34:14,500 --> 01:34:20,080 levels of remediation that would be required depending upon the use and yet 1132 01:34:20,080 --> 01:34:26,440 there's concern that if we don't have remediation start immediately that there is 1133 01:34:26,440 --> 01:34:35,360 chance of incursion of any of the toxic sludge from the ponds escaping. I don't know how 1134 01:34:35,360 --> 01:34:39,820 we deal with that because we're not the owners of the property. We don't have a development 1135 01:34:39,820 --> 01:34:47,120 plan for the property. And as I said, I believe the remediation would vary depending upon 1136 01:34:47,960 --> 01:34:55,340 the type of development that is determined. So I don't have an answer to this. I just think 1137 01:34:55,340 --> 01:34:59,980 it's something that we need to consider and at least express that yes. 1138 01:35:00,000 --> 01:35:08,200 We know that there could be some risk there, but we don't really have the ability to do anything 1139 01:35:08,200 --> 01:35:09,580 about it at this point. 1140 01:35:11,320 --> 01:35:14,720 With the ponds in general, the environmental risk there. 1141 01:35:14,900 --> 01:35:15,060 Yeah, no. 1142 01:35:15,360 --> 01:35:20,340 That's been an important topic for council president, bomb gardener as well, and this time 1143 01:35:20,340 --> 01:35:26,560 it's not under city ownership either, so it's kind of, but I think we should do some studies 1144 01:35:26,560 --> 01:35:31,680 on that at some point and something we definitely know in the plan from the standpoint of making 1145 01:35:31,680 --> 01:35:38,620 sure where that area is not toxic or not spreading toxins around, Councillor Bonnington had 1146 01:35:38,620 --> 01:35:40,780 a comment on the plan. 1147 01:35:42,000 --> 01:35:49,740 Maybe I'm being overly cautious with this analysis, but to the extent that this map just 1148 01:35:49,740 --> 01:35:57,680 flexible area just like we are not including language that says we're encouraging that specific 1149 01:35:57,680 --> 01:36:06,740 part to be developed to deliberately remove it from the map and state that we're not going 1150 01:36:06,740 --> 01:36:12,300 to allow development there would immediately have an inherent bias for our land use decisions 1151 01:36:12,300 --> 01:36:17,440 we might have to hear in the future so we kind of need to leave it in the middle I would 1152 01:36:17,440 --> 01:36:21,920 think of just being realistic about the fact that it's 1153 01:36:21,920 --> 01:36:26,240 developable and whatever comes after that, that's the 1154 01:36:26,240 --> 01:36:27,700 decision we may hear in the future. 1155 01:36:28,960 --> 01:36:32,760 Something to solve our city regulations and appreciate 1156 01:36:32,760 --> 01:36:39,490 that. Any other thoughts, council president, please? 1157 01:36:39,970 --> 01:36:45,250 Thanks. So I do have, and this is kind of in the interest of 1158 01:36:45,250 --> 01:36:49,090 clearing up something that I continue to hear, concern, 1159 01:36:49,090 --> 01:36:58,770 and brought to us, and including tonight, the reference to the public comment not being 1160 01:36:58,770 --> 01:37:06,630 available to the, I don't know if it was, it has been stated about, it was not available 1161 01:37:06,630 --> 01:37:08,010 to the working group. 1162 01:37:08,930 --> 01:37:16,930 I don't know if maybe you could clarify that a little bit, I know that was a question 1163 01:37:16,930 --> 01:37:22,530 you've answered in the past, but maybe you could just for the record remind how that was made 1164 01:37:22,530 --> 01:37:23,030 available. 1165 01:37:25,250 --> 01:37:26,410 Yes, thank you. 1166 01:37:26,950 --> 01:37:35,410 So when the survey was done, or was put out for the community to respond to in December of 1167 01:37:35,410 --> 01:37:39,810 2024, it was open for about six weeks till the end of January. 1168 01:37:40,530 --> 01:37:44,070 We received a number of comments from the community. 1169 01:37:44,070 --> 01:37:54,690 We had distilled those comments down into a matrix and then provided responses that then we gave to the working group. 1170 01:37:55,390 --> 01:38:00,550 We did not supply them the hundreds of pages of actual emails and comment letters. 1171 01:38:00,890 --> 01:38:03,130 We put it into that matrix, so it was more digestible. 1172 01:38:04,130 --> 01:38:05,950 So that was provided to them. 1173 01:38:06,890 --> 01:38:09,070 We heard feedback that that wasn't acceptable. 1174 01:38:09,070 --> 01:38:18,990 So moving forward with the Planning Commission and Council, we provide all comments that have been submitted from that time forward in your packets. 1175 01:38:19,290 --> 01:38:23,470 There are links on the page five of your agenda bill. 1176 01:38:23,710 --> 01:38:28,690 Links to all of the comments we received leading up to your decision making process. 1177 01:38:30,270 --> 01:38:31,330 Thank you. 1178 01:38:31,490 --> 01:38:38,210 I just wanted to clarify that because I had kept coming up and I just wanted the public to know that 1179 01:38:38,210 --> 01:38:47,650 their comments are being read and we are taking them into consideration and on the subject of the 1180 01:38:47,650 --> 01:38:54,190 cleanup of the ponds and I don't know if this is a question that can even be answered right now 1181 01:38:54,190 --> 01:39:04,270 but it's a it's really a legal question that can the city require a more strict level of diligence 1182 01:39:04,270 --> 01:39:13,150 than DEQ, can a city of Westland, for instance, say, well, DEQ is only requiring 1183 01:39:13,830 --> 01:39:19,110 ex steps to be done. That's not good enough for us. We're going to up the empty. Is that 1184 01:39:19,110 --> 01:39:27,270 something that cities can do? Yes, that's a great question. And I did speak with staff at DEQ. 1185 01:39:27,850 --> 01:39:34,970 They have never had this happen, but they said it would be possible for a city to enact 1186 01:39:34,970 --> 01:39:40,370 stricter standards, like parts per million of a cleanup if they wanted to, but you would 1187 01:39:40,370 --> 01:39:48,570 have to go through the process of setting that through a scientific research project, and then 1188 01:39:48,570 --> 01:39:55,410 get it into your code, which takes several years, and then they said that there could also 1189 01:39:55,410 --> 01:39:59,970 be a challenge of, because the standards set by the State of Oregon and... 1190 01:40:14,020 --> 01:40:30,540 And then just kind of now we're speculating so bear with me. But in your experience, would that then need to be 1191 01:40:30,540 --> 01:40:38,560 property would that be then a new standard or could we apply it on a case-by-case basis? 1192 01:40:39,580 --> 01:40:40,960 It would be the standard. 1193 01:40:41,760 --> 01:40:42,400 Okay. 1194 01:40:44,960 --> 01:40:50,400 And I'm very interested to hear about the potential of converting paper mills. 1195 01:40:51,020 --> 01:40:55,960 So if anybody, and I'm putting this out there because I'm genuinely interested, 1196 01:40:56,280 --> 01:41:00,700 but at least one of the examples that you mentioned is was a text-style mill, 1197 01:41:00,700 --> 01:41:04,000 not a paper mill. So it was, 1198 01:41:06,630 --> 01:41:11,890 well, textile mills, of course, had less chemical. That's the concern. 1199 01:41:11,990 --> 01:41:19,330 I'm just saying that if there's paper mills that were the similar process of what these mills 1200 01:41:19,330 --> 01:41:25,670 were doing, then I'm really interested in not reinventing the wheel if some other human disability 1201 01:41:25,670 --> 01:41:32,190 has found the ability to do this. I think it'd be great to learn about that, how they were successful 1202 01:41:32,190 --> 01:41:36,990 and maybe even we could find out funding sources for clean up. 1203 01:41:37,390 --> 01:41:42,390 Maybe there's federal funds available for instance for these purposes. 1204 01:41:46,480 --> 01:41:47,640 That's it. 1205 01:41:48,120 --> 01:41:54,200 Okay, and I did want to note, Mr. Schumacher brought up the resolution. 1206 01:41:55,640 --> 01:41:58,460 It just did the Plenty Department of Justice City Attorney draft the resolutions. 1207 01:41:59,200 --> 01:42:00,920 I don't recall the process for this one. 1208 01:42:01,400 --> 01:42:02,540 I drafted the resolution. 1209 01:42:02,540 --> 01:42:06,880 And if you would like to add the, with recommendations, be happy to do that. 1210 01:42:07,080 --> 01:42:11,320 Yeah, and I was thinking, when it gives to the adoption stage, like, if you had the planning 1211 01:42:11,320 --> 01:42:14,440 commission's recommendation specified out, and then the next whereas, and they're kind 1212 01:42:14,440 --> 01:42:19,920 of specified, what the city council that the city council accepted them and took some action on it, 1213 01:42:20,980 --> 01:42:24,660 you know, and what we basically, what we've been discussing and what we decided to do, 1214 01:42:24,760 --> 01:42:28,360 based on those recommendations, it could be helpful just to make sure the resolution's 1215 01:42:28,360 --> 01:42:37,500 that we adhered to the Planning Commission recommendation or we received the recommendation and acted on it in X-way. 1216 01:42:38,200 --> 01:42:42,460 Okay, we can update the resolution to have a... 1217 01:42:42,460 --> 01:42:42,520 Yeah. 1218 01:42:43,400 --> 01:42:44,740 Do exactly as you just said. 1219 01:42:45,220 --> 01:42:46,100 Sounds good. 1220 01:42:47,120 --> 01:42:48,360 Thank you for that. 1221 01:42:50,600 --> 01:42:54,840 Is everybody okay with that from the City Council just making the resolution a little bit more 1222 01:42:54,840 --> 01:43:04,840 and certain, okay, see not. So with that, are there any other issues on the waterfront plan? 1223 01:43:04,920 --> 01:43:09,300 I have to tell you, everybody I'm excited because this has been a long time, long-term 1224 01:43:09,300 --> 01:43:14,700 process that's been, the Council President and I were elected in 2020 and we've been working 1225 01:43:14,700 --> 01:43:20,460 on the waterfront trying to see this through for many years and so I'll save my longer statement 1226 01:43:20,460 --> 01:43:25,340 until the next meeting, but very exciting to get to this point and 10 years in the making. 1227 01:43:26,200 --> 01:43:28,080 Darren, I think this has been one of your main projects. 1228 01:43:28,240 --> 01:43:31,720 The entire time you've been with the City of Westland, if I'm not mistaken, so it would 1229 01:43:31,720 --> 01:43:31,920 work. 1230 01:43:32,580 --> 01:43:35,460 We'll get to get across the finish line. 1231 01:43:35,820 --> 01:43:40,280 Mr. Williams, any final thoughts on the waterfront plan for we turn to the next exciting 1232 01:43:40,280 --> 01:43:40,580 plan? 1233 01:43:41,240 --> 01:43:46,940 Let's keep the agenda moving, but we will be making those changes that you've defined. 1234 01:43:46,940 --> 01:43:51,820 And the current adoption schedule is November 18th meeting. 1235 01:43:52,300 --> 01:43:53,980 I'll talk a little bit more about Council over. 1236 01:43:54,100 --> 01:43:55,680 Schedule later in the meeting. 1237 01:43:56,460 --> 01:44:01,580 And also just to note that we will perhaps forward some options by email. 1238 01:44:01,700 --> 01:44:03,680 But the Council does not make decisions by email. 1239 01:44:04,520 --> 01:44:10,160 So you just be reviewing those individually and making the decisions in our meeting. 1240 01:44:10,840 --> 01:44:12,240 Exactly. That was my thought. 1241 01:44:13,900 --> 01:44:14,280 I'm going to... 1242 01:44:14,280 --> 01:44:16,280 I'd like to reassure the public about things like that. 1243 01:44:16,280 --> 01:44:17,820 No, I appreciate that. 1244 01:44:18,100 --> 01:44:19,860 A Council President has requested a break, 1245 01:44:20,000 --> 01:44:22,100 and I agree we've been at it for almost two hours, 1246 01:44:22,260 --> 01:44:24,220 so we will take a quick five minute break, 1247 01:44:24,380 --> 01:44:26,300 and then get to vision 43. 1248 01:44:26,740 --> 01:44:29,120 We are ahead of schedule tonight, so appreciate that. 1249 01:44:29,420 --> 01:44:31,180 We're in recess going 1250 01:44:38,450 --> 01:44:39,410 on back there. 1251 01:44:39,810 --> 01:44:40,770 We've got to restore, 1252 01:44:40,830 --> 01:44:42,230 or thank you very much, everybody. 1253 01:44:42,710 --> 01:44:43,930 Now, the crowd has filed out, 1254 01:44:43,930 --> 01:44:46,610 but we still have Rebecca Holland back from Main Street 1255 01:44:46,610 --> 01:44:48,210 and Steve Cooper back there. 1256 01:44:48,230 --> 01:44:49,230 Thank you for being here. 1257 01:44:49,230 --> 01:44:52,690 We will reconvene the meeting. 1258 01:44:54,470 --> 01:44:58,430 Again, we're in a work session on October 21st, 2025. 1259 01:44:59,390 --> 01:44:59,830 We have finished. 1260 01:45:00,000 --> 01:45:12,240 The waterfront vision plan review and sent that on to the adoption phase. Just for the record, Mr. Williams, when is that going to be forgot to clarify, the waterfront plan will be adopted on November 18th, okay. 1261 01:45:12,980 --> 01:45:17,820 So we will look forward to that and we'll transition to the vision 43 project update. 1262 01:45:18,200 --> 01:45:27,780 So lots of two important plans being discussed tonight and I'll turn it over to Mr. Chris Myers, associate planner who's been working very hard over. 1263 01:45:27,780 --> 01:45:33,220 I don't know if it's been two years now on Vision 43, but glad to have you on board. 1264 01:45:34,420 --> 01:45:35,560 Thank you, Mayor Bill Estoski. 1265 01:45:35,800 --> 01:45:38,840 Appreciate it, Council President, Baumgartner, and Councilors. 1266 01:45:39,120 --> 01:45:45,020 Appreciate your time tonight and yes, to confirm it's 24 months this month that we've been working on this project. 1267 01:45:45,440 --> 01:45:49,340 Since both approval and we start as many money on it, so yeah, I call it 24 months. 1268 01:45:51,040 --> 01:45:52,360 Yeah, we're getting there. 1269 01:45:52,400 --> 01:45:54,080 Peace by peace, we'll talk a little bit about that. 1270 01:45:54,780 --> 01:45:56,380 Yeah, thank you very much for the time tonight. 1271 01:45:56,380 --> 01:46:07,180 It's been a little bit since we've given you an update on the project and we've had a few changes and strategic pivots on a couple things that I want to bring you up to speed on and then talk about the timeline. 1272 01:46:08,540 --> 01:46:15,180 So before I get started as you know, I really enjoy giving credit to those who do a lot of work that you don't get to see. 1273 01:46:15,760 --> 01:46:24,140 And so as it has become regular, I have to give a shout out to Lynn Schroeder. She's been the back one of this project internally for us and without her I wouldn't. 1274 01:46:24,140 --> 01:46:34,160 This project would not be where it's at right now, and I also want to give a second shout out to our new community development director Steve Coper his insights coming from outside of the city 1275 01:46:34,160 --> 01:46:42,180 Coming from another jurisdiction and multiple jurisdictions have actually been really enlightening for me as a project manager to kind of a few things maybe a little bit differently 1276 01:46:42,180 --> 01:46:47,960 We get a little lost in it sometimes stuck in the I can't see the force in the trees and really appreciate that 1277 01:46:48,680 --> 01:46:53,700 Plus he's my boss and writes my review. I'm kidding. I actually do appreciate it. See you. Thank you 1278 01:46:54,640 --> 01:46:58,100 So it's, oh, I have a controller, I don't know if 1279 01:47:02,680 --> 01:47:08,220 I apologize, technical difficulties, on the side green, look at that. 1280 01:47:09,260 --> 01:47:11,600 Okay, all right. 1281 01:47:12,160 --> 01:47:18,360 So tonight's topics, we are going to talk about a project timeline extension, a budget amendment. 1282 01:47:18,360 --> 01:47:24,960 phase approach to our rezoning process and a larger strategic pivot. 1283 01:47:25,040 --> 01:47:30,740 Thank you, Mayor Bill Estoski, for that language that I completely took from you today. 1284 01:47:33,440 --> 01:47:39,400 All right, so as I normally do, just in case there's someone viewing in the audience or on TV online 1285 01:47:39,400 --> 01:47:42,200 that doesn't know what vision 43 is of a brief description. 1286 01:47:44,720 --> 01:47:50,280 We are out developing a new community vision for the Highway 43 corridor here in Westland. 1287 01:47:51,060 --> 01:47:55,080 We are collaborating and have been collaborating for almost two years now with community 1288 01:47:55,080 --> 01:48:00,760 members to shape our project recommendations, we're out to enhance walking and biking connections 1289 01:48:00,760 --> 01:48:02,380 within and to the corridor. 1290 01:48:03,040 --> 01:48:11,080 We're trying to expand opportunities for local businesses, housing and community gathering, 1291 01:48:11,080 --> 01:48:13,020 community gathering places. 1292 01:48:13,720 --> 01:48:15,300 And lastly, of course, sort of how the 1293 01:48:15,300 --> 01:48:17,820 sausage is made up dating city plans and policies 1294 01:48:17,820 --> 01:48:20,480 that support that vision from our community 1295 01:48:20,480 --> 01:48:22,620 and implementing those project goals and recommendations. 1296 01:48:26,060 --> 01:48:27,820 So project timeline extension. 1297 01:48:28,660 --> 01:48:31,360 We originally planned for approval to be this month, 1298 01:48:31,540 --> 01:48:32,640 October of 2025. 1299 01:48:33,720 --> 01:48:35,700 We've had to adjust a little bit as we've gone on, 1300 01:48:35,880 --> 01:48:37,600 I'll get into some of the details as of why. 1301 01:48:38,180 --> 01:48:47,560 We have extended the project timeline with a plan for approval of July 26, June July 26. 1302 01:48:49,860 --> 01:48:52,920 The extended timeline is going to allow a couple things to happen. 1303 01:48:53,960 --> 01:48:58,440 We are going to increase our outreach with residential property owners within the focus area. 1304 01:48:58,920 --> 01:49:02,920 I'll get into a little bit more of the detail on in a few slides or a little bit here. 1305 01:49:02,920 --> 01:49:09,120 And then also it's going to give us more time for some community open houses to review some of the proposed code language. 1306 01:49:09,820 --> 01:49:14,240 Again, I will dive a little deeper into that as we move through tonight's presentation. 1307 01:49:15,980 --> 01:49:22,320 And then the next another smaller update for you is we've had a budget amendment to the project. 1308 01:49:22,940 --> 01:49:27,460 As you may remember, this council will approve $200,000 for the Vision 43 project. 1309 01:49:27,460 --> 01:49:34,060 And we, with the extended timeline, it adds a little bit of consultant project management 1310 01:49:34,060 --> 01:49:34,720 cost. 1311 01:49:35,440 --> 01:49:40,520 And as part of that extension, we've also asked for some simplified visualizations, 1312 01:49:40,740 --> 01:49:45,160 some renderings that might be a little easier for the lay person to understand exactly 1313 01:49:45,160 --> 01:49:46,460 what we're talking about. 1314 01:49:46,700 --> 01:49:50,120 And in those newer renderings that we're going to, you'll simplify versions of renderings, 1315 01:49:50,220 --> 01:49:56,820 we're going to get what can be done now, and then what could be done with what's sort 1316 01:49:56,820 --> 01:49:58,500 be talked about as new code. 1317 01:49:58,880 --> 01:49:59,920 So give me a sort of a before. 1318 01:50:00,000 --> 01:50:08,000 After a few weeks, it really let the community understand what it could look like, what it would look, possibly could look like. 1319 01:50:09,620 --> 01:50:15,960 The amended budget, we added $19,850 to our contract with MIG, our consulting firm on the project. 1320 01:50:16,960 --> 01:50:27,760 Those funds were actually already budgeted for the vision 33 project through the budget cycle that started July 1, 2025, and we are now utilizing them for the project. 1321 01:50:27,760 --> 01:50:33,280 So that is done, but just thought I, full disclosure, show you our new amended budget, 1322 01:50:36,120 --> 01:50:38,040 and let me pause there for a moment. 1323 01:50:38,340 --> 01:50:43,100 Just any questions about the timeline or budget, any concerns, outrageous remarks? 1324 01:50:45,500 --> 01:50:51,040 When you say visualizations, are we talking still images or video renderings? 1325 01:50:51,340 --> 01:51:00,660 Still images. I would love some fly through type renderings, but they happen to be quite expensive and beyond the range of the budget that we have for this project. 1326 01:51:00,660 --> 01:51:06,900 All right. I'm sorry. Leave me, I've seen them for other, like they're really cool. 1327 01:51:07,460 --> 01:51:13,520 Yes, they'll be still, but I think they're going to be a far more palatable view than our sort of side version 1328 01:51:13,520 --> 01:51:22,280 that we've had for this project, the sort of that cross section. You're going to be a little bit easier to kind of see what we're talking about. 1329 01:51:22,700 --> 01:51:28,700 I think it's going to help the community understand more of what the code shift and change might do for it for the city. 1330 01:51:29,680 --> 01:51:35,760 Our friends at TBCTV always tell me, they ask me, do you have any ideas for, do you need 1331 01:51:35,760 --> 01:51:40,540 any video projects or, you know, things, promotional things that they can help us out with? 1332 01:51:41,380 --> 01:51:47,640 So if you ever want to, you know, quick 60 second or two minute read however long video 1333 01:51:48,380 --> 01:51:53,980 for on Vision 43 to talk about, you know, whatever you'd like with it, I'm sure they'd be willing 1334 01:51:54,660 --> 01:51:58,700 to help out and come out and even film and work on the project. 1335 01:51:59,220 --> 01:52:00,260 So something to think about. 1336 01:52:00,340 --> 01:52:00,820 Yeah, that's great. 1337 01:52:00,940 --> 01:52:04,660 We'll reach out and discuss options and see where that's fantastic. 1338 01:52:04,780 --> 01:52:05,660 Speaking of videos. 1339 01:52:08,620 --> 01:52:12,180 Any other questions on the timeline or budget? 1340 01:52:13,720 --> 01:52:14,180 See, none. 1341 01:52:14,400 --> 01:52:15,400 Too pretty easy updates. 1342 01:52:15,620 --> 01:52:18,080 I have four total tonight, so get the easy ones out of the way. 1343 01:52:18,900 --> 01:52:23,140 So the next part, and let me say this before. 1344 01:52:23,140 --> 01:52:27,700 to that next screen. I really appreciate Council's patience. I know we all want this project 1345 01:52:27,700 --> 01:52:34,780 done a year ago or last month of this month. Sometimes when you get into a long-term project, 1346 01:52:35,240 --> 01:52:40,000 things change. You hear things from the community and you need to shift and pivot as a mayor 1347 01:52:40,000 --> 01:52:44,400 was talking to me about earlier today. And those pivots take a little bit of time. So we appreciate 1348 01:52:44,400 --> 01:52:48,780 that your patience and getting through this with us. We all want it done quickly, but we also 1349 01:52:48,780 --> 01:52:51,700 really, really want to done right, especially for a 1350 01:52:51,700 --> 01:52:53,620 a visioning project that should go for decades, 1351 01:52:54,060 --> 01:52:56,280 or should a document that's helped guide us for decades. 1352 01:52:56,680 --> 01:52:59,540 So I just want to say I appreciate the patience from council. 1353 01:53:00,700 --> 01:53:04,160 So the next part, let's talk about it as the rezoning strategy. 1354 01:53:05,620 --> 01:53:07,440 So you remember we have three focus areas, 1355 01:53:08,040 --> 01:53:10,140 and sort of the initial concept has been 1356 01:53:10,140 --> 01:53:13,760 we'll rezone all the properties within those focus areas. 1357 01:53:14,500 --> 01:53:17,160 Well, we've been getting some feedback from the community 1358 01:53:17,160 --> 01:53:25,880 that maybe that's not entirely, some people are concerned, I'll put it to you that way, and we 1359 01:53:25,880 --> 01:53:31,080 do our best to listen to the community and hear what they have to say, so we are going to pivot 1360 01:53:31,080 --> 01:53:36,460 just a little bit on that strategy. So what we're going to do now, based on concerns and then staff 1361 01:53:36,460 --> 01:53:43,920 recognition that the extensive outreach we've had so far, maybe this rezoning residential 1362 01:53:43,920 --> 01:53:51,140 properties deserves a little bit more specific outreach. So we're going to take vision 43 and do a 1363 01:53:51,140 --> 01:53:56,840 rezoning process in a phased approach. So we're going to start with, we're essentially at this point 1364 01:53:56,840 --> 01:54:03,820 going to do two phases. Phase one is going to focus on those primarily commercial, commercially 1365 01:54:03,820 --> 01:54:08,420 zoned properties in the corridor right now within the focus series. I'm going to give you guys some 1366 01:54:08,420 --> 01:54:16,020 here in a minute. A few of the properties will be residentially zoned. Most of those are already 1367 01:54:16,020 --> 01:54:21,400 acting as commercial properties. However, that happened over the years. We're not sure it did, 1368 01:54:21,540 --> 01:54:26,140 so we're going to clean that up. But most of these are already zoned commercial properties. 1369 01:54:26,240 --> 01:54:33,180 That'll be phase one. And then phase two, we'll go back and look at residential properties within 1370 01:54:33,180 --> 01:54:37,160 the focus areas. I think that's where a lot of the concern has been coming from some of the 1371 01:54:37,160 --> 01:54:42,500 community is like, hey, wait a minute, like, we don't understand how this is going to affect us, 1372 01:54:42,780 --> 01:54:48,560 we are concerned, and so we hear those concerns and don't want to just rush through a process. 1373 01:54:50,440 --> 01:54:57,060 So the other part that this will allow us to do, taking this phase to approach what I envision 1374 01:54:58,120 --> 01:54:59,980 is inviting each of the... 1375 01:55:00,000 --> 01:55:07,960 Proper residential property owners within the focus areas to come meet with us, probably in smaller groups or one big group of not sure. 1376 01:55:08,620 --> 01:55:16,300 And really discuss their concerns, what reasoning would look like, what could happen, you know, what sort of worst case for them. 1377 01:55:16,560 --> 01:55:21,780 And really talk through that with them, so that they have a level of comfort if we do reason on their property. 1378 01:55:21,920 --> 01:55:26,420 I think that we owe them the respect to do that, and we hear those concerns. 1379 01:55:26,420 --> 01:55:28,620 So this is why we're kind of pumping the brakes 1380 01:55:28,620 --> 01:55:30,880 and wanting to take a phased approach. 1381 01:55:32,680 --> 01:55:34,740 Councillor Grunner has a question for you. 1382 01:55:35,160 --> 01:55:39,020 Yeah, from a homeowner's point of view, 1383 01:55:39,300 --> 01:55:41,080 in a property that's going to be resowned, 1384 01:55:41,740 --> 01:55:44,520 is that likely to increase or decrease the value of this property? 1385 01:55:44,960 --> 01:55:48,700 Well, you know, I honestly might amateur opinion 1386 01:55:48,700 --> 01:55:50,580 about that, or I assume a professional planner, 1387 01:55:50,820 --> 01:55:51,900 but I'm not an agent. 1388 01:55:52,160 --> 01:55:53,640 I mean, Kevin has some hurt. 1389 01:55:53,720 --> 01:55:55,240 Councillor Bonney has some thoughts. 1390 01:55:55,820 --> 01:56:02,260 I think when you open up the opportunities on a property, it probably has an added value. 1391 01:56:02,740 --> 01:56:08,220 If you can only build a home there today, it has one value if you can do five or six different 1392 01:56:08,220 --> 01:56:08,540 things. 1393 01:56:08,660 --> 01:56:13,340 Maybe that increases the value, but again, that's just my opinion, I don't know if Councillor Bonney 1394 01:56:13,340 --> 01:56:14,620 is in a professional realtor. 1395 01:56:14,960 --> 01:56:18,680 Professional opinion, it definitely increases it, I mean it may be valuable to someone 1396 01:56:18,680 --> 01:56:24,620 to have a home where their neighbors aren't going to develop something larger, but in general, 1397 01:56:24,620 --> 01:56:29,140 it is worth more to be able to open it up and on market much more valuable. 1398 01:56:29,600 --> 01:56:30,320 Thank you. 1399 01:56:30,580 --> 01:56:39,340 And one other comment to that is that question has been asked of me recently at the Robin 1400 01:56:39,340 --> 01:56:46,140 with Neighbor Dissociation in the last week, and I think there's a little bit of distrust 1401 01:56:46,140 --> 01:56:49,100 when we give the answer of, oh it'll increase the value of your property. 1402 01:56:49,680 --> 01:56:53,360 And I think we want to be able to sit down and show someone that that's the case versus 1403 01:56:53,360 --> 01:56:56,460 just sort of off the cuff say sure it's going to increase the value for property. 1404 01:56:56,800 --> 01:57:02,240 We want to assure them we're not out trying to take value for anyone and I think again 1405 01:57:02,240 --> 01:57:06,320 it's not that you'll see on the map we're not talking about hundreds and hundreds of 1406 01:57:06,320 --> 01:57:10,720 residential properties and I also don't think those would be the properties that would 1407 01:57:10,720 --> 01:57:17,800 get developed first so I think we're okay if we just kind of slow that part down and 1408 01:57:17,800 --> 01:57:21,040 move forward with that phase one of really getting at those commercial properties. 1409 01:57:21,540 --> 01:57:25,020 Yeah, but for most owners of properties, they're concerned with their properties. 1410 01:57:25,220 --> 01:57:26,040 That's 100%. 1411 01:57:26,800 --> 01:57:27,980 100% correct. 1412 01:57:28,340 --> 01:57:31,820 And we want to be able to hear those and assure them what we know. 1413 01:57:33,640 --> 01:57:35,960 And there are some hard truths in there as well. 1414 01:57:36,140 --> 01:57:36,380 Yes. 1415 01:57:37,080 --> 01:57:41,680 If your property is resumed, your neighbor might do something different than a single family home. 1416 01:57:42,020 --> 01:57:44,780 Or maybe they'll add an ADU that could have a small business. 1417 01:57:45,040 --> 01:57:45,680 I don't know. 1418 01:57:46,240 --> 01:57:47,700 We haven't really sussed that part out. 1419 01:57:47,700 --> 01:57:53,380 The reason we got to this phasing approach was that we had already been in discussion internally 1420 01:57:53,380 --> 01:57:57,500 and with our consulting firm and even counselor break was in on some of these conversations 1421 01:57:58,800 --> 01:58:04,080 about how do we, we've got two different things going on here, we have commercial properties 1422 01:58:04,080 --> 01:58:07,920 that are adjacent to the highway and then we have some residential properties that are not. 1423 01:58:08,520 --> 01:58:17,600 The same zone for those properties is probably not appropriate, one probably needs to be a 1424 01:58:17,600 --> 01:58:22,480 and sort of two different zones or sub zones 1425 01:58:22,480 --> 01:58:23,680 or how do we want to call it. 1426 01:58:24,060 --> 01:58:26,860 So it kind of made sense as the feedback kept coming in. 1427 01:58:27,120 --> 01:58:30,180 Yeah, let's just tackle the first, let's phase it 1428 01:58:30,180 --> 01:58:32,060 and tackle the commercial first. 1429 01:58:32,320 --> 01:58:36,600 I'll give us time to talk to folks and address the concerns. 1430 01:58:37,220 --> 01:58:37,660 Thank you. 1431 01:58:37,960 --> 01:58:38,400 Yeah, absolutely. 1432 01:58:40,360 --> 01:58:44,200 Uh, I think, oh, here we go. 1433 01:58:44,200 --> 01:58:46,260 Oh, I did them already, didn't I? 1434 01:58:46,480 --> 01:58:46,860 I'll reach. 1435 01:58:48,700 --> 01:58:49,640 Okay, yeah, here we go. 1436 01:58:50,260 --> 01:58:54,420 So the language on my left, I suppose we are left as well. 1437 01:58:54,560 --> 01:58:57,100 The language on the left is actually consistent 1438 01:58:57,100 --> 01:58:58,540 through the next three slides. 1439 01:58:59,660 --> 01:59:02,800 What you're looking at are the focus areas outlined in red, 1440 01:59:03,360 --> 01:59:06,140 and the blue shade are the properties 1441 01:59:06,140 --> 01:59:08,900 that we would intend to rezone in phase one. 1442 01:59:09,680 --> 01:59:12,900 Almost all of those are commercial properties today. 1443 01:59:12,900 --> 01:59:19,720 Again, there are a few lingering residential properties in there, but primarily these are commercially 1444 01:59:19,720 --> 01:59:20,480 zoned properties. 1445 01:59:20,760 --> 01:59:29,380 This is a focus area one, I'm trying to, I don't have a cursor, but yeah, Walmart's down 1446 01:59:29,380 --> 01:59:34,820 there toward the bottom of the screen, the big square white box there, all the way up to 1447 01:59:34,820 --> 01:59:36,620 the burgerville area at the top of the screen. 1448 01:59:36,700 --> 01:59:39,640 So that would be phase one in focus area one. 1449 01:59:39,640 --> 01:59:43,640 I'm going to go through the next two maps as well. 1450 01:59:44,600 --> 01:59:45,620 Councillor Breit has a question. 1451 01:59:45,860 --> 01:59:46,280 Oh, I'm sorry. 1452 01:59:47,860 --> 01:59:55,500 Just I think that the concern is going to be more with the properties that are just outside 1453 01:59:55,500 --> 01:59:59,820 the focus areas that are residential, more so even then residential. 1454 02:00:00,000 --> 02:00:09,540 Properties that that could be resound, especially as we've looked at this many of these don't act as residential properties anyway. 1455 02:00:10,360 --> 02:00:24,560 So I'm hopeful that with the outreach that we can also set up time to talk, maybe with some of those adjacent property owners, too, so they can get kind of a sense of what might happen next door to them or in front of them. 1456 02:00:24,560 --> 02:00:30,100 Yeah. I think that's a really good point. I'm glad you brought that up. How we get at that, 1457 02:00:30,340 --> 02:00:35,320 do we have everyone come together or do we separate that? We can kind of work that out through 1458 02:00:35,320 --> 02:00:39,600 the process, but I think that's a really good point. Thank you for bringing that up. I've got to know. 1459 02:00:41,020 --> 02:00:45,820 So here's Focus Area 2, sort of the center of the screen, the point of that middle triangle is the 1460 02:00:45,820 --> 02:00:52,480 old-bolt and firehouse, just to give you some context of where we're at. And you can see we've taken 1461 02:00:52,480 --> 02:00:56,520 all those residential properties out of the phase one approach. 1462 02:00:57,300 --> 02:01:00,340 The focus area boundaries have all stayed the same. 1463 02:01:01,120 --> 02:01:04,140 And so we're just removing those residential properties 1464 02:01:04,140 --> 02:01:05,340 for the most part. 1465 02:01:06,000 --> 02:01:09,520 And then focus area three, bottom of the screen is I205. 1466 02:01:10,240 --> 02:01:13,240 You can see the market of choice kind of in the middle there 1467 02:01:13,240 --> 02:01:16,840 with the library not too far north of Burnt Street. 1468 02:01:17,500 --> 02:01:22,460 So again, we've removed quite a few residential properties 1469 02:01:22,460 --> 02:01:35,460 off of the west side or to our left or phase one? Councillor Bonnetton. Was the Bolton Firehouse 1470 02:01:35,460 --> 02:01:42,440 removed on purpose? Not as it was not blue. Has it always been removed? It's blue. Is it new? 1471 02:01:42,700 --> 02:01:49,520 Oh, okay. The only thing that we all want to do. Never mind, my bad. Sorry. I had a moment of panic 1472 02:01:53,400 --> 02:02:03,600 So that's our phase approach, I'll pause here and certainly take issues, concerns, questions of council. 1473 02:02:09,220 --> 02:02:11,500 I will keep going and feel free to stop me. 1474 02:02:11,720 --> 02:02:12,340 Can you continue? 1475 02:02:20,320 --> 02:02:25,440 So the next and last thing I have for you tonight is our strategic pivot. 1476 02:02:28,340 --> 02:02:30,800 So previously I've come to you with policy questions. 1477 02:02:30,800 --> 02:02:37,000 And then we talked about pros and cons, and there were some questions on those questions, right, and that's perfectly normal. 1478 02:02:37,700 --> 02:02:39,640 So we're going to pivot a little bit on this. 1479 02:02:39,920 --> 02:02:45,280 And what we're going to do is, because it's a fairly time consuming process to go through, 1480 02:02:45,780 --> 02:02:49,360 is we're going to sort of bake the cake a little bit more before we bring it back to you. 1481 02:02:49,380 --> 02:02:56,040 And what I mean by that is we're going to take out the draft code, I'll show you here in a moment. 1482 02:02:56,040 --> 02:03:05,280 And we're going to, we're going to go through, and we are going to take it to our technical advisory committee, and our project working group both in November. 1483 02:03:06,160 --> 02:03:08,160 We're going to go to some neighborhood associations in January. 1484 02:03:08,900 --> 02:03:11,060 We're going to have open houses in January and February. 1485 02:03:12,560 --> 02:03:16,300 And at some point, well, then we'll start our work sessions with planning commission. 1486 02:03:16,720 --> 02:03:21,740 So what we're going to do is take more and more of the community feedback specifically about that draft code. 1487 02:03:21,740 --> 02:03:26,240 I envision those open houses being big round tables where we're kind of old school planning, 1488 02:03:26,260 --> 02:03:31,140 talking about what the code means, and we're going to bring you back a sort of some higher 1489 02:03:31,140 --> 02:03:36,840 level questions, but we're going to be much further down the road and that way you guys as a council 1490 02:03:36,840 --> 02:03:42,340 won't have to get quite down in the minutiae. We're going to let the community and our advisory groups 1491 02:03:42,340 --> 02:03:50,200 kind of vacate a little bit. You'll still get all the time you want with the code, but we feel like we 1492 02:03:50,200 --> 02:03:54,260 can be a little bit more effective and efficient that way and remove some of that noise 1493 02:03:54,260 --> 02:03:58,020 so you can see a little bit more of a finished product and then let's feed back from 1494 02:03:58,020 --> 02:03:58,620 there. 1495 02:03:59,080 --> 02:04:04,280 And the issues get further, some vetting for the community too, so it's not like us as five 1496 02:04:04,280 --> 02:04:09,220 city counselors making these seemingly pretty big decisions, get some public feedback on 1497 02:04:09,220 --> 02:04:09,440 that. 1498 02:04:09,520 --> 02:04:12,500 So when it comes to us, we already kind of know where the public stands on it. 1499 02:04:12,720 --> 02:04:12,920 That's great. 1500 02:04:13,060 --> 02:04:14,900 Yeah, that's exactly what we're trying to do. 1501 02:04:15,280 --> 02:04:19,140 When we realized how long it was going to take to move through those, it just seemed like 1502 02:04:19,140 --> 02:04:24,920 really onerous for Council, we'll take on that work and work with the community and bring 1503 02:04:24,920 --> 02:04:26,300 something back. 1504 02:04:26,960 --> 02:04:29,120 Council Brighk has a piece of feedback? 1505 02:04:29,920 --> 02:04:32,540 As you know, I'm really impatient for all of this to happen. 1506 02:04:33,060 --> 02:04:42,660 What I understand, though, is by going through this process and drafting the code, then when 1507 02:04:42,660 --> 02:04:49,120 we do finally approve Vision 43 right after that, the next developer that comes in 1508 02:04:49,120 --> 02:04:54,820 wants to do something will be under the new code because it will all be kind of rolled in together. 1509 02:04:55,600 --> 02:04:59,980 So, if we approved the vision this month or next month. 1510 02:05:00,750 --> 02:05:06,810 Anybody that came in between now and when all the code was written would still be under the old rules? 1511 02:05:08,030 --> 02:05:16,330 And I also think by doing this, especially the community outreach, people are going to have a much better understanding of what that is. 1512 02:05:16,590 --> 02:05:24,630 If we just say, the code's going to change, we'll talk about that later, then they have a lot of unease. They just, they don't know what to expect. 1513 02:05:24,630 --> 02:05:29,570 By going through this process with the code, I think we're going to end up with a really great product 1514 02:05:30,170 --> 02:05:36,410 That people will understand and will be excited about hopefully as excited as I am. 1515 02:05:36,550 --> 02:05:37,770 Yeah, I appreciate you saying. 1516 02:05:37,870 --> 02:05:43,490 I think that's exactly kind of the approach we're going to that shift that pivot that we're going to take is 1517 02:05:43,490 --> 02:05:49,830 Let's let this get vetted more through our both our advisory groups, but also our community 1518 02:05:49,830 --> 02:05:52,490 And I think the community will feel more comfortable. 1519 02:05:53,270 --> 02:05:55,010 Now, does that mean every person's going to love it? 1520 02:05:55,130 --> 02:05:55,530 Of course not. 1521 02:05:55,690 --> 02:05:56,670 We know how this works. 1522 02:05:57,110 --> 02:05:58,290 That's not going to happen. 1523 02:05:58,930 --> 02:06:01,030 But I think it will address a lot of concerns 1524 02:06:01,030 --> 02:06:03,610 as we move through that process in that manner. 1525 02:06:04,570 --> 02:06:07,710 Again, this is also part of why we've extended that contract 1526 02:06:07,710 --> 02:06:09,070 and why we've extended the timeline. 1527 02:06:10,750 --> 02:06:14,030 And I feel like it doesn't really extend the timeline. 1528 02:06:14,730 --> 02:06:16,850 Because as I said, if the code hasn't changed, 1529 02:06:17,310 --> 02:06:19,090 somebody could come in with a project 1530 02:06:19,090 --> 02:06:22,430 before we change the code and they're going under the old rules. 1531 02:06:22,770 --> 02:06:26,430 That's right, and just as an FYI to Council, I'm sure you know this, but a reminder, 1532 02:06:26,750 --> 02:06:30,790 if someone applies for a project today, today's code is what applies to their application, 1533 02:06:31,410 --> 02:06:33,910 even if tomorrow the code was changed. 1534 02:06:34,930 --> 02:06:41,010 So yeah, until the code is officially adopted, and then there's a 35 day notification to the state 1535 02:06:41,010 --> 02:06:47,010 once that clears, the code is active and live, so yeah, there's still some waiting time there, 1536 02:06:47,010 --> 02:06:53,270 But I think this will get a better product and it will allow council to see something a little 1537 02:06:53,270 --> 02:06:58,170 clear and not have to kind of load around at 30,000 feet answering 15 different questions. 1538 02:06:58,730 --> 02:07:02,310 I think we can get there without putting you through that torture as a process. 1539 02:07:03,150 --> 02:07:06,850 That is our goal with how we're that that's the pivot that we're talking about. 1540 02:07:10,150 --> 02:07:16,150 And then while we're still on that, this is again the last part of it here, just a couple 1541 02:07:16,150 --> 02:07:21,090 things. There's a lot of different policy questions and thoughts and discussion about the code. 1542 02:07:21,570 --> 02:07:26,770 This is just two slides of things that are being discussed, topics that are being discussed with 1543 02:07:26,770 --> 02:07:34,270 the consultant, internally, things like limiting drive-through uses or expansions and remodels of 1544 02:07:34,270 --> 02:07:41,290 existing structures. Do they get exemptions or not? Hight limits adjacent to residential zones. 1545 02:07:41,510 --> 02:07:45,810 We all know that's important. Ensuring the massing of buildings doesn't create sort of 1546 02:07:45,810 --> 02:07:51,750 that can in our tunnel effect, and exceptions process, do we have, will we have an exceptions 1547 02:07:51,750 --> 02:07:52,630 process? 1548 02:07:53,350 --> 02:07:58,810 Prioritizing pedestrian access to and through sites, fearful consideration of what is an 1549 02:07:58,810 --> 02:08:05,530 allowed year, what is an allowed use near residential areas and properties we obviously have 1550 02:08:05,530 --> 02:08:09,410 a fairly hot topic with a car wash application right now. 1551 02:08:09,970 --> 02:08:15,470 So, we want to make sure the community has given their opinions about what those would be, 1552 02:08:15,470 --> 02:08:19,450 what allowed users those would be, can we get every single one of them? Of course not. 1553 02:08:19,810 --> 02:08:23,930 We want to make sure that we are out getting those answers. And then obviously creating 1554 02:08:23,930 --> 02:08:30,530 enough, creating enough flexibility that development happens, but with our community's vision, 1555 02:08:30,910 --> 02:08:37,250 not necessarily just a developer's vision. So it's a much like Councillor Bright said, 1556 02:08:37,370 --> 02:08:42,050 we all want this done, we've wanted this done, we can't wait till it's done. But the reality 1557 02:08:42,050 --> 02:08:46,770 of it is sometimes we have to slow down back up, listen to the community that we said we 1558 02:08:46,770 --> 02:08:50,290 are going to listen to anyway and then try and redirect a little bit. 1559 02:08:50,450 --> 02:08:51,590 So that's where we're at. 1560 02:08:51,810 --> 02:08:57,970 Those are my four pieces for you tonight and I'm happy to answer any questions or concerns 1561 02:08:57,970 --> 02:08:59,170 that you might have. 1562 02:08:59,650 --> 02:09:05,410 Just one question on a related topic that Erborneud district feasibility study, any updates 1563 02:09:05,410 --> 02:09:09,810 on that can, you know, now that we've delayed the timeline on this maybe it gives some 1564 02:09:09,810 --> 02:09:12,630 to synchronize the two potential efforts. 1565 02:09:13,210 --> 02:09:18,310 Yes, so we received Steve, our community development director is the project manager on that, 1566 02:09:18,450 --> 02:09:26,830 but we did receive an email from the consultants earlier this week, and they're looking 1567 02:09:28,530 --> 02:09:32,110 at these kind of analyzing the scope right now and we're expecting some feedback. 1568 02:09:32,530 --> 02:09:35,450 I think this week, so that process is moving forward. 1569 02:09:35,530 --> 02:09:39,770 We had a little bit of a pause there on our end, but it looks like we're moving 1570 02:09:39,770 --> 02:09:45,070 I think there's something there with the changing the zoning and then having an urban 1571 02:09:45,070 --> 02:09:49,930 dual district there in case development happens to capture those increasing the 1572 02:09:49,930 --> 02:09:53,210 accessibility there for this infrastructure and everything for the planet could help 1573 02:09:53,210 --> 02:09:56,650 fund vision 43 plan implementation even down the line. 1574 02:09:56,670 --> 02:09:59,970 I think it's a very key and important piece to eventually have a 1575 02:10:00,000 --> 02:10:06,300 Thank you for the update. We'll look forward to hearing more about that in the future. Any other questions? 1576 02:10:07,000 --> 02:10:14,020 From the council. I also just got to thank you for your even Stephen Lynn for all your work in the community centered approach you're taking to this. 1577 02:10:14,100 --> 02:10:22,140 I think is awesome. It's really feels like this community and foreign plan and we'll be when it gets adopted in a few months. 1578 02:10:22,140 --> 02:10:26,480 Even more, so now that we're taking a few extra months to go back out to the community, 1579 02:10:26,980 --> 02:10:30,180 this planning department listens to the community, I know that about them. 1580 02:10:30,980 --> 02:10:32,720 So, Councillor Groner, did you have a comment there? 1581 02:10:33,000 --> 02:10:33,700 Yes, thank you. 1582 02:10:35,100 --> 02:10:37,900 I see no other from closing comments. 1583 02:10:38,660 --> 02:10:43,080 Last thing, just next steps, so I guess this will, will this not come back to us for a while 1584 02:10:43,080 --> 02:10:44,740 as you go out and to do that. 1585 02:10:45,400 --> 02:10:50,720 I think I'd like to bring you just a small, like a 15-minute update, maybe in the next two to three 1586 02:10:50,720 --> 02:10:56,660 just to keep you informed and not have such big gaps in briefings. Nothing major, but let 1587 02:10:56,660 --> 02:11:00,140 you know, we're on track, you know, kind of generally what we're hearing, I think that would 1588 02:11:00,140 --> 02:11:05,260 be, you know, something that we could probably pull off pretty easily, and I just want 1589 02:11:05,260 --> 02:11:06,760 to make sure Councils informed. 1590 02:11:08,780 --> 02:11:10,800 So yeah, that's, that's kind of my thought process. 1591 02:11:11,440 --> 02:11:17,240 So, that sounds great. I see no other comments from the Council. I see no other comments 1592 02:11:17,240 --> 02:11:19,180 from the council at this late hour. 1593 02:11:19,440 --> 02:11:20,900 So I will let you go. 1594 02:11:21,040 --> 02:11:22,100 Thank you for your time. 1595 02:11:22,180 --> 02:11:23,180 Thank you, Chris. 1596 02:11:24,020 --> 02:11:30,700 And Steve Lynn, we will move on to the final item on the agenda 1597 02:11:30,700 --> 02:11:31,780 and believe it or not. 1598 02:11:31,900 --> 02:11:34,700 We are actually ahead of schedule for the agenda. 1599 02:11:34,860 --> 02:11:38,200 It's 823 and we were scheduled to get it this at 850. 1600 02:11:39,240 --> 02:11:42,900 So Mr. Williams, you always have some great report. 1601 02:11:43,560 --> 02:11:44,240 So thank you, Mayor. 1602 02:11:44,340 --> 02:11:44,880 Take it away. 1603 02:11:44,880 --> 02:11:48,260 But I did hear you say this is late hour, so I will keep it short. 1604 02:11:49,520 --> 02:11:52,260 As always, starting with your upcoming meeting calendar, 1605 02:11:53,100 --> 02:11:56,980 this is your last session in October. 1606 02:11:57,740 --> 02:12:02,840 We have three meetings scheduled in three regular meetings where 1607 02:12:02,840 --> 02:12:07,260 work sessions scheduled in November, work session on November 4th. 1608 02:12:07,280 --> 02:12:10,120 Planning will be back talking about the Metro Town Center boundaries. 1609 02:12:10,260 --> 02:12:12,740 We'll be explaining what those are, why they're important, 1610 02:12:12,740 --> 02:12:21,080 and how you can think about them, and also an update on the operations complex design and funding. 1611 02:12:21,320 --> 02:12:26,460 We're doing a lot of work on the funding piece of that, really lately, and we very much 1612 02:12:26,460 --> 02:12:33,060 want to have clear council direction and community awareness of where we are. The November 11th meeting 1613 02:12:33,060 --> 02:12:40,940 is cancelled because that is Veterans Day Day off for the city. Instead, the business meeting will be 1614 02:12:40,940 --> 02:12:46,140 November 18th, that'll be a special meeting and we have a number of things on that topic, 1615 02:12:46,680 --> 02:12:52,120 including adoption of the Waterfront Plan, as we talked about earlier. We also have a special 1616 02:12:52,120 --> 02:12:59,020 meeting scheduled November 17th, this is the morning meeting, the next follow-up meeting on the 1617 02:12:59,020 --> 02:13:06,140 budget priorities and strategic plan work, which I talked a little bit last week. We are working on 1618 02:13:06,140 --> 02:13:12,580 a draft plan is directed by Council and we will have a draft of that out for your consideration 1619 02:13:12,580 --> 02:13:17,820 well in advance of the 17th. So we're excited about doing all that work and then as I 1620 02:13:17,820 --> 02:13:25,240 always say this time of year, only two regular meetings left for 2025. So you've worked hard all 1621 02:13:25,240 --> 02:13:31,060 your long way of a few more big things to do. I also enjoyed the Metro Mix with this afternoon. 1622 02:13:31,060 --> 02:13:38,020 I mean, it's specific pitches to specific metro department directors about things that are going on in Westland. 1623 02:13:38,620 --> 02:13:43,520 And it's my belief that everything you just heard about tonight is squarely in the wheelhouse of Metro. 1624 02:13:43,780 --> 02:13:51,660 So I've made a case, as I'm sure some of you did, for Metro interest in Highway 43, including infrastructure improvements in the future. 1625 02:13:51,900 --> 02:13:59,140 There's a possibility to be a new transportation bond floated in the region within the next five years. 1626 02:13:59,140 --> 02:14:09,900 Westland needs to be on the list of projects that would be part of that we were last time we should be again and with the ambitious work that you are doing that's grounded in the community 1627 02:14:09,900 --> 02:14:18,380 I think we have a great chance to be included in consideration so that we can turn highway 43 into something that we can really be proud of so we should continue to advocate for that 1628 02:14:19,020 --> 02:14:23,900 even more squarely connected to Metro's goals is the waterfront project and the 1629 02:14:23,900 --> 02:14:31,400 environmental and cultural work that is happening in that plan or that needs to happen after the vision is adopted. 1630 02:14:32,060 --> 02:14:39,060 I think we have so many potential overlaps with Metro that we should just be having a mixture with them every week because sort of my plan. 1631 02:14:39,340 --> 02:14:48,220 But they rejected that plan but maybe some periodic event where we really we really make sure to meet with them. 1632 02:14:48,220 --> 02:14:54,020 And having our district counselor be from Westland and so and familiar with the work happening 1633 02:14:54,020 --> 02:14:58,220 here and involved is a huge advantage and opportunity for us right now. 1634 02:14:58,220 --> 02:14:59,920 uh... we are the only clock 1635 02:15:00,000 --> 02:15:05,720 Members County Community that has that, so let's take advantage of Councillor Lewis's passion for 1636 02:15:05,720 --> 02:15:11,140 what's happening in Westland and make use of it. So I just think it's all very exciting. 1637 02:15:12,740 --> 02:15:19,540 On the upcoming calendar, we have an AP meeting on Thursday night that we Councillor Bonnet and I will 1638 02:15:19,540 --> 02:15:26,360 be attending, I believe, hopefully we have a quorum of any P members at that meeting. On the city 1639 02:15:26,360 --> 02:15:33,320 calendar, I noticed something, how often do you have a chance to be in a meeting with a Nobel 1640 02:15:33,320 --> 02:15:39,900 peace prize winner? The library's author talked tomorrow is Malalo, you suffice, you 1641 02:15:39,900 --> 02:15:48,460 suffice, I, sorry, and talking about her new book, and I think it's a pretty cool opportunity 1642 02:15:48,460 --> 02:15:52,240 for a clock tomorrow, if you want to join, you can find information on the city's calendar. 1643 02:15:52,240 --> 02:15:56,020 That is super cool, library is busy with Comic Con. 1644 02:15:56,320 --> 02:16:01,080 We heard earlier today about the fall forest fall festival in the forest. 1645 02:16:02,080 --> 02:16:05,040 And our staff did an amazing work on that from multiple departments. 1646 02:16:06,300 --> 02:16:08,260 And I appreciate all of that. 1647 02:16:08,260 --> 02:16:13,500 Also in the library vein, still time to participate in the libraries strategic planning work. 1648 02:16:13,720 --> 02:16:16,560 That was that comment period is open till November 4th. 1649 02:16:16,620 --> 02:16:21,360 And you can find information on the city's website on that as well. 1650 02:16:21,360 --> 02:16:31,780 So speaking of the library, as you know, I've been participating in a county wide library district task force that was convened by the county to think about the future of our library system. 1651 02:16:32,220 --> 02:16:41,900 As we are heading towards 20 years from the current agreement, folks are thinking about what is the future of our library system is our funding adequate. 1652 02:16:41,900 --> 02:16:57,500 How is funding a divvied around the county by the various people that pay the the levy work is happening on that and I think enough is happening now that at some point in the next few months would be good to have a council topic on this 1653 02:16:57,500 --> 02:17:07,700 We don't tend to talk much in this room about the about library county services and funding and I think it would probably be good to get us up to speed on that 1654 02:17:07,700 --> 02:17:13,200 have a conversation so that you can know what the county is thinking about. The reason 1655 02:17:13,200 --> 02:17:18,440 this is important is there are a lot of people around the county thinking of potentially 1656 02:17:18,440 --> 02:17:25,860 a major restructuring of the way county library services are provided and what the funding for 1657 02:17:25,860 --> 02:17:32,520 those services are which would be pretty complex and I think it would be good to put a little 1658 02:17:32,520 --> 02:17:36,740 marker and get some counsel feedback early on this process. 1659 02:17:36,940 --> 02:17:38,920 So the next couple of months, probably early in the new year, 1660 02:17:39,080 --> 02:17:40,640 we'll think about something like that. 1661 02:17:40,860 --> 02:17:42,980 If you're interested, presuming you're interested. 1662 02:17:45,580 --> 02:17:51,340 That is, I think most of what I had, I will be at the ICMA Conference, 1663 02:17:51,580 --> 02:17:56,220 my national professional association, leaving Friday and back next Wednesday evening. 1664 02:17:57,900 --> 02:17:59,920 So you know who to contact and while I'm away, 1665 02:17:59,920 --> 02:18:04,440 I will be working those days, but just a little less responsive than usual. 1666 02:18:05,860 --> 02:18:09,660 So, I wish you the joy of the season, and we'll see you in November. 1667 02:18:10,780 --> 02:18:11,440 Sounds good. 1668 02:18:11,480 --> 02:18:17,100 And I heard to the great fine on LinkedIn that you will be speaking at the conference on a particular topic. 1669 02:18:17,180 --> 02:18:19,060 I am speaking very excited. 1670 02:18:19,220 --> 02:18:24,660 My predecessor, we're talking about creative community outreach and how you reach community in new ways. 1671 02:18:24,860 --> 02:18:25,440 So it's going to be fun. 1672 02:18:26,340 --> 02:18:26,360 Awesome. 1673 02:18:26,360 --> 02:18:42,280 Well, best of luck and best wishes to Mr. Gabriella Lados as well as always, and have fun at the conference, and learn a lot, and we will see everybody in November, happy Halloween, everybody, and very early happy Halloween from the Western City Council. 1674 02:18:42,660 --> 02:18:43,320 We're adjourned.