1 00:00:05,780 --> 00:00:08,650 Planning Board, I call to order. Tuesday, August 4th, 2 00:00:09,320 --> 00:00:13,160 2026, at Westbrook High School, Room 114, 3 00:00:13,380 --> 00:00:14,700 125 Travelor Street. 4 00:00:16,220 --> 00:00:19,920 This meeting will be offered as a hybrid meeting accommodating both in-person 5 00:00:20,140 --> 00:00:24,100 and remote participation. The link and phone number to join the meeting 6 00:00:24,140 --> 00:00:27,150 through Zoom is located on the Planning Board agenda, which can be found on the 7 00:00:27,180 --> 00:00:29,180 City of Westbrook website, 8 00:00:29,280 --> 00:00:32,570 westbrookmaine.com/agendacenter. 9 00:00:32,580 --> 00:00:36,360 Where public comment is permitted, members of the public attending remotely will 10 00:00:36,460 --> 00:00:39,030 also have the opportunity to provide remote testimony. 11 00:00:39,680 --> 00:00:42,510 If you wish to speak during a public hearing or a public comment, 12 00:00:43,320 --> 00:00:47,300 use your raise hand function through Zoom or dial nine 13 00:00:47,340 --> 00:00:50,240 on your phone when instructed by the Planning Board chair. 14 00:00:50,300 --> 00:00:54,200 Comments will only be accepted during a public hearing or 15 00:00:54,260 --> 00:00:57,470 public comment period and should remain specific to the application as being 16 00:00:58,140 --> 00:00:58,740 discussed. 17 00:00:59,660 --> 00:01:01,720 With that, roll call, Jenna, please. 18 00:01:04,560 --> 00:01:05,420 Karen Axelson? 19 00:01:06,480 --> 00:01:06,700 Here. 20 00:01:09,099 --> 00:01:09,800 Jason Frazier? 21 00:01:10,460 --> 00:01:10,660 Here. 22 00:01:11,820 --> 00:01:13,380 Nancy Lichochapies? 23 00:01:13,440 --> 00:01:13,640 Here. 24 00:01:14,470 --> 00:01:15,220 Kevin Price? 25 00:01:15,400 --> 00:01:15,600 Here. 26 00:01:16,100 --> 00:01:17,000 Robin Tanebaum? 27 00:01:17,760 --> 00:01:17,940 Here. 28 00:01:18,560 --> 00:01:19,340 Oriana Farnham? 29 00:01:19,820 --> 00:01:19,960 Here. 30 00:01:20,800 --> 00:01:21,539 Lucas Shrake? 31 00:01:21,800 --> 00:01:21,960 Here. 32 00:01:22,460 --> 00:01:23,300 Larry McWilliams? 33 00:01:23,420 --> 00:01:23,580 Here. 34 00:01:23,860 --> 00:01:24,660 And John Turcotte. 35 00:01:24,860 --> 00:01:24,960 Here. 36 00:01:26,420 --> 00:01:26,780 Thank you. 37 00:01:27,780 --> 00:01:29,350 With that, we'll go into regular business. 38 00:01:29,400 --> 00:01:31,840 Orlando, can you read the first item in the record, please? 39 00:01:33,240 --> 00:01:37,220 Item number 24-000632: 40 00:01:37,400 --> 00:01:41,240 Site Plan Approval Extension Request, 4 and 7 Kitter Lane, Quaker 41 00:01:41,300 --> 00:01:45,280 Lane Associates, LLC. The applicant is requesting an extension on their 42 00:01:45,300 --> 00:01:47,740 site plan approval in a phased project schedule. 43 00:01:48,260 --> 00:01:52,040 Tax Map 032, Lot 107, and Tax Map 44 00:01:52,280 --> 00:01:55,800 032, Lot 109, Zoned City Center District. 45 00:01:57,360 --> 00:01:59,910 Thank you. With that, can we have the applicant presentation, please? 46 00:02:11,820 --> 00:02:14,600 Good evening. My name is Craig Burtis with Acorn Engineering. 47 00:02:15,560 --> 00:02:17,300 Looks like I have the wrong project up here. 48 00:02:18,580 --> 00:02:21,380 I don't know if I necessarily need presentation slides tonight. 49 00:02:21,960 --> 00:02:25,060 As mentioned, this is for a site plan approval 50 00:02:25,660 --> 00:02:29,410 extension. It was originally approved last year and then 51 00:02:29,460 --> 00:02:33,440 amended in September. So the client is looking to actually 52 00:02:33,520 --> 00:02:35,130 start construction this fall, 53 00:02:36,220 --> 00:02:39,580 and he's looking at performing the work in a phased approach. 54 00:02:39,660 --> 00:02:43,220 Phase one will include the initial site 55 00:02:43,340 --> 00:02:43,740 setup, 56 00:02:44,560 --> 00:02:46,980 which will involve demolition of 57 00:02:48,100 --> 00:02:51,600 existing buildings, pavement, gravel, utilities, 58 00:02:52,040 --> 00:02:55,900 installation of all the erosion control that's shown on 59 00:02:56,060 --> 00:02:57,460 the civil plan drawings, 60 00:02:58,380 --> 00:03:02,260 and then also installing a lot of the heavy utility work. 61 00:03:02,340 --> 00:03:03,220 That includes 62 00:03:04,040 --> 00:03:07,940 installing the conduit for the gas main, 63 00:03:08,560 --> 00:03:12,280 the sanitary sewer connections, as well as 64 00:03:13,240 --> 00:03:15,280 some of the three-phase electrical work. 65 00:03:16,260 --> 00:03:19,900 Also included in the phase one is all the 66 00:03:20,320 --> 00:03:24,200 main storm drain runs. So there's storm drain runs that go from west 67 00:03:24,260 --> 00:03:27,880 to east across the site, as well as replacement of, 68 00:03:28,430 --> 00:03:32,220 there's a 48-inch pipe that runs right underneath Dana 69 00:03:32,280 --> 00:03:34,900 Street out toward Presumpscot River. 70 00:03:34,940 --> 00:03:38,780 So phase one includes replacement of that pipe, that 48-inch 71 00:03:38,840 --> 00:03:41,299 pipe, as well as a lot of the main storm drain runs. 72 00:03:41,700 --> 00:03:43,680 Not included in phase one are all the 73 00:03:44,520 --> 00:03:48,109 storm tree filters and the rain garden. 74 00:03:48,170 --> 00:03:50,520 So those will be constructed in phase two. 75 00:03:51,920 --> 00:03:55,820 So in your packets, there are construction cost estimates 76 00:03:55,880 --> 00:03:59,840 for both phase one and phase two. Phase two is anticipated 77 00:03:59,880 --> 00:04:02,280 to start next spring, 78 00:04:03,600 --> 00:04:06,500 weather dependent, as soon as the site contractor can get in there. 79 00:04:07,660 --> 00:04:11,640 Likely March, maybe April. So they're looking to start the phase two 80 00:04:12,160 --> 00:04:14,900 next year. So there's a lot more work in phase two. 81 00:04:16,440 --> 00:04:16,859 And then 82 00:04:17,840 --> 00:04:20,340 the erosion control will have to be 83 00:04:20,421 --> 00:04:24,320 reevaluated in spring. So as part of the phase one, they'll 84 00:04:24,360 --> 00:04:28,000 install the erosion control. There'll be a lot of double layers of silt 85 00:04:28,040 --> 00:04:30,780 fence installed along Presumpscot River. 86 00:04:30,840 --> 00:04:34,640 That will likely sit during the wintertime while the site is dormant. 87 00:04:34,680 --> 00:04:38,320 And then when they come to the site next spring, they'll have to revisit the 88 00:04:38,360 --> 00:04:41,980 erosion control, and then the city will likely have to do 89 00:04:42,020 --> 00:04:45,320 inspections to make sure that's up to par, and then they'll go ahead and initiate 90 00:04:45,400 --> 00:04:45,960 phase two. 91 00:04:46,820 --> 00:04:50,610 We understand that there's some work before construction starts this fall, 92 00:04:50,700 --> 00:04:54,420 including the pre-con meeting. There's still some minor 93 00:04:54,560 --> 00:04:58,420 site plan changes out there that Acorn Engineering needs to 94 00:04:58,560 --> 00:05:02,360 address, including depicting how the river walk connects 95 00:05:02,440 --> 00:05:04,460 over to the Saccarappa Park parcel. 96 00:05:04,540 --> 00:05:07,660 So we intend to do that, and construction is supposed to start this 97 00:05:08,600 --> 00:05:12,160 fall. So I'll leave it to the planning board. 98 00:05:12,200 --> 00:05:15,060 I'm here to respond to any questions that you have. Thank you. 99 00:05:15,830 --> 00:05:16,400 Thank you, Craig. 100 00:05:17,320 --> 00:05:17,950 Staff response? 101 00:05:19,040 --> 00:05:22,860 Yep. So as Craig stated, this started with a site plan approval extension 102 00:05:22,880 --> 00:05:26,560 request because the approval would have been set to expire in September. 103 00:05:27,040 --> 00:05:30,440 But then with that, in talking with the development team 104 00:05:30,880 --> 00:05:34,540 and coordinating with the Saccarappa Park project, which is also 105 00:05:35,560 --> 00:05:39,520 working towards getting ready to start, there was a desire to phase the 106 00:05:39,560 --> 00:05:43,520 development out. How the conditions are currently written, if they were to start 107 00:05:43,560 --> 00:05:47,540 with the utility work this fall, they would have to put in the full performance 108 00:05:47,620 --> 00:05:51,560 guarantee for the overall project, as well as have the site work contractor 109 00:05:51,620 --> 00:05:55,400 to do the pre-con and things that they weren't necessarily 110 00:05:55,440 --> 00:05:59,260 ready for now, although there's benefit for getting the 111 00:05:59,300 --> 00:06:03,120 demolition done now and the utility work in the Saccarappa Park side of the 112 00:06:03,160 --> 00:06:05,800 project in coordination with that side. 113 00:06:05,840 --> 00:06:08,410 So that was the impetus to the phased approach, 114 00:06:09,460 --> 00:06:13,000 was to separate that out so they would provide the performance 115 00:06:13,060 --> 00:06:16,820 guarantee for just that site work, be able to proceed with that in the fall, 116 00:06:17,060 --> 00:06:19,990 and then have the full performance guarantee for the overall project when they're 117 00:06:20,020 --> 00:06:21,340 ready to move forward in the 118 00:06:22,292 --> 00:06:23,052 Spring, ideally. 119 00:06:24,132 --> 00:06:27,572 So with this, as Craig said, you have the separated 120 00:06:28,032 --> 00:06:31,992 cost estimates in your packet. We also slightly amended the conditions 121 00:06:32,452 --> 00:06:36,302 to allow for a call-out for the commencement of work in phase one and of 122 00:06:36,352 --> 00:06:40,232 work in phase two. But there weren't any substantive changes 123 00:06:40,272 --> 00:06:44,112 to the conditions other than what would be required before the commencement of each 124 00:06:44,192 --> 00:06:46,092 one of those phases. 125 00:06:47,592 --> 00:06:49,232 Thank you. 126 00:06:50,572 --> 00:06:52,312 This is open to the public comment. 127 00:06:52,362 --> 00:06:55,272 Do we have anybody in the public that wishes to speak on this issue? 128 00:06:56,692 --> 00:06:57,912 I see none. Any through Zoom? 129 00:07:00,012 --> 00:07:03,972 If there's anyone participating via Zoom and would like to speak, please raise 130 00:07:03,992 --> 00:07:04,392 your hand. 131 00:07:07,412 --> 00:07:08,112 I'm seeing none. 132 00:07:08,212 --> 00:07:10,092 Okay. With that, I'll close the public comment. 133 00:07:11,392 --> 00:07:11,692 Any 134 00:07:12,772 --> 00:07:14,352 board members, any comments? 135 00:07:17,292 --> 00:07:20,832 Through you to the planner. The amendment from last September, that was just an 136 00:07:20,872 --> 00:07:22,952 amendment. That was, in itself, an extension, correct? 137 00:07:23,792 --> 00:07:27,072 That was just an amendment to the subdivision, but with that, it inherently kind of 138 00:07:27,152 --> 00:07:28,212 restarted the clock- 139 00:07:28,232 --> 00:07:28,242 Okay 140 00:07:28,242 --> 00:07:29,772 ... for when the 12 months is. But yes. 141 00:07:29,892 --> 00:07:31,752 Okay, so this is their first extension request? 142 00:07:31,812 --> 00:07:32,132 Yes. 143 00:07:32,232 --> 00:07:35,252 All right, thank you. I think everyone gets one extension. It's a big project. 144 00:07:35,552 --> 00:07:36,272 I don't have a problem with it. 145 00:07:37,652 --> 00:07:38,132 Thank you, John. 146 00:07:39,232 --> 00:07:39,632 Anyone else? 147 00:07:42,692 --> 00:07:46,612 Okay, I see none. The only thing I did see, just by looking at some 148 00:07:46,672 --> 00:07:50,632 of the paper, I'm still learning all the grading and the underneath work and 149 00:07:51,012 --> 00:07:54,932 so forth, but what I did notice was on the 48-inch pipes, they're now going to 150 00:07:54,972 --> 00:07:55,472 plastic- 151 00:07:55,852 --> 00:07:55,932 Yes 152 00:07:55,942 --> 00:07:58,702 ... versus concrete. How long has something like that been going on? 153 00:07:58,772 --> 00:08:00,642 And I guess it's more cost-effective. 154 00:08:01,192 --> 00:08:05,182 Yeah. It's more cost-effective. It lasts just as 155 00:08:05,252 --> 00:08:08,172 long. It's easier to handle on the site. 156 00:08:08,512 --> 00:08:12,152 It's easier to just move around the site. The concrete pipe, it's a lot heavier. 157 00:08:12,972 --> 00:08:16,572 So yes, a lot of the bigger pipe now is the HDPE, the 158 00:08:16,612 --> 00:08:18,412 high-density polyethylene plastic. 159 00:08:18,932 --> 00:08:22,192 Yeah, I saw that. I was interested in that just because it looks like it'd be a lot 160 00:08:22,232 --> 00:08:25,032 easier to work, and it does have the same lifespan as concrete, so. 161 00:08:25,312 --> 00:08:25,532 Yes. 162 00:08:25,692 --> 00:08:28,822 All right, cool. That's my only question, so yeah, I have no other problems with 163 00:08:28,892 --> 00:08:29,032 that. 164 00:08:30,552 --> 00:08:32,631 With that, we have a motion on page two 165 00:08:33,732 --> 00:08:34,533 of our memos. 166 00:08:36,192 --> 00:08:37,252 If somebody would be so kind. 167 00:08:37,581 --> 00:08:37,602 Mr. Chair? 168 00:08:37,632 --> 00:08:38,112 Yes, John. 169 00:08:39,092 --> 00:08:42,653 I move to approve the request from Quake Lane Associates for a one-year extension 170 00:08:42,672 --> 00:08:46,652 in phased project schedule on the site plan approval, dated April 15th, 2025, 171 00:08:46,692 --> 00:08:50,612 and amended September 2nd, 2025, for the demolition and redevelopment 172 00:08:50,652 --> 00:08:54,172 of the parcels located at the end of Kidder Lane to construct a 173 00:08:54,212 --> 00:08:57,932 multi-story, mixed-use complex to include 110 residential units, 174 00:08:58,322 --> 00:09:01,992 a commercial use, and a westerly expansion of the Riverwalk Trail 175 00:09:02,092 --> 00:09:05,672 located on the parcels identified as four and seven, 176 00:09:06,312 --> 00:09:10,112 Kidder Lane, Tax Map 32, Lots 107 and 109, 177 00:09:10,352 --> 00:09:14,112 Zoned City Center District, Village Review Overlay Zone, and Shoreland 178 00:09:14,192 --> 00:09:17,832 Zone. All previously approved findings of fact and conclusions of approval 179 00:09:18,292 --> 00:09:21,902 associated with the September 2nd, 2025, approval 180 00:09:22,372 --> 00:09:26,312 remain applicable. Wow. Approval 181 00:09:26,322 --> 00:09:29,982 also includes the following conditions, as stated on page two through four of this 182 00:09:30,032 --> 00:09:33,812 staff memo dated July 31st, 2026, which are adopted in 183 00:09:33,852 --> 00:09:34,732 support of this approval. 184 00:09:35,392 --> 00:09:36,812 Thank you. Can I get a second, please? 185 00:09:37,252 --> 00:09:37,512 Second. 186 00:09:37,832 --> 00:09:39,572 Thank you, Kevin. Roll call, Jenna. 187 00:09:43,072 --> 00:09:44,072 Robin Tannenbaum? 188 00:09:45,152 --> 00:09:46,352 Yes. Oh, sorry. 189 00:09:48,092 --> 00:09:48,992 Nancy Litwak Abes? 190 00:09:50,352 --> 00:09:54,092 Well, so formerly, I recused myself from this project, but it's an 191 00:09:54,152 --> 00:09:56,932 extension, so I don't know, do I vote or just recuse? 192 00:09:57,992 --> 00:10:01,892 If you feel that you can be impartial to the extension and the board is 193 00:10:02,052 --> 00:10:03,512 okay with that, then you can stay on. 194 00:10:05,552 --> 00:10:07,252 I'm in support of the extension. 195 00:10:09,132 --> 00:10:10,092 No problem. Thank you. 196 00:10:12,172 --> 00:10:12,912 Jason Frazier? 197 00:10:13,332 --> 00:10:13,552 Yes. 198 00:10:15,112 --> 00:10:15,852 Karen Axelson? 199 00:10:16,392 --> 00:10:16,652 Yes. 200 00:10:17,692 --> 00:10:18,352 Kevin Price? 201 00:10:18,552 --> 00:10:18,752 Yes. 202 00:10:20,112 --> 00:10:20,972 Lucas Shrake? 203 00:10:21,012 --> 00:10:21,252 Yes. 204 00:10:22,352 --> 00:10:23,092 Oriana Farnum? 205 00:10:23,572 --> 00:10:23,792 Yes. 206 00:10:25,332 --> 00:10:25,932 John Turcotte? 207 00:10:26,332 --> 00:10:26,552 Yes. 208 00:10:28,572 --> 00:10:29,572 And Larry McWilliams. 209 00:10:30,032 --> 00:10:30,372 Yes. 210 00:10:31,272 --> 00:10:34,462 Seeing unanimous. Thank you. With that, we go into new business. 211 00:10:34,512 --> 00:10:35,212 Orlando, can you- 212 00:10:35,312 --> 00:10:35,482 Thank you 213 00:10:35,512 --> 00:10:36,872 ... read the next item in the record, please? 214 00:10:38,952 --> 00:10:42,632 Item number 26-000527, site 215 00:10:42,671 --> 00:10:46,132 plan, 3 Saunders Way, WWS Properties, LLC. 216 00:10:46,712 --> 00:10:50,212 The applicant is requesting a renovation and an expansion to the existing Bill 217 00:10:50,292 --> 00:10:54,232 Dodge Kia automobile dealership, including a 2,160 218 00:10:54,292 --> 00:10:58,092 square foot addition to the service area and a 3,850 219 00:10:58,132 --> 00:10:59,572 square foot addition to the showroom. 220 00:11:00,032 --> 00:11:03,892 Tax Map 042B, Lot 113, Zone 221 00:11:04,032 --> 00:11:07,932 Gateway Commercial, use automobile dealership repair service. 222 00:11:08,992 --> 00:11:11,622 Thank you. With that, applicant presentation. 223 00:11:13,032 --> 00:11:16,372 All right. Good evening. It's Dustin Roma with DM Roma Consulting 224 00:11:16,452 --> 00:11:17,152 Engineers. 225 00:11:18,792 --> 00:11:19,292 There we go. 226 00:11:20,612 --> 00:11:24,232 I'm here tonight representing WWS Properties for this proposed 227 00:11:24,272 --> 00:11:28,092 expansion at the Bill Dodge Kia auto facility on 3 228 00:11:28,132 --> 00:11:28,992 Saunders Way. 229 00:11:33,932 --> 00:11:35,432 Just trying to get organized here. 230 00:11:37,672 --> 00:11:41,272 So we were here as a sketch plan workshop item 231 00:11:42,552 --> 00:11:46,432 at the last meeting, and since then, really just been working 232 00:11:46,532 --> 00:11:50,372 closely with Kia on a review of the proposed 233 00:11:50,432 --> 00:11:54,312 renovations. This building is one of the buildings on 234 00:11:54,432 --> 00:11:58,372 the complex here, which is essentially one of the older buildings that's there, 235 00:11:58,472 --> 00:11:59,172 or the one that 236 00:12:00,892 --> 00:12:01,492 is 237 00:12:02,912 --> 00:12:04,672 most in need of renovations as far as 238 00:12:05,652 --> 00:12:07,232 kind of a new facelift on these projects. 239 00:12:07,262 --> 00:12:10,952 So we're excited to be able to work with Kia and Bill Dodge to kind of make some 240 00:12:11,012 --> 00:12:13,672 improvements to this one building facility here. 241 00:12:15,232 --> 00:12:18,952 Pretty much all of the improvements are really the main part that you 242 00:12:19,032 --> 00:12:22,582 see as you come into the property. So it's the sales and 243 00:12:22,692 --> 00:12:24,412 service area that's kind of 244 00:12:25,348 --> 00:12:25,548 For 245 00:12:26,688 --> 00:12:28,268 right in the front of the building there. 246 00:12:28,928 --> 00:12:32,908 So that's going to be the location where most of these improvements are being made. 247 00:12:32,968 --> 00:12:36,548 We do have a small service area that's being expanded 248 00:12:37,048 --> 00:12:40,308 on the backside of the building to kind of square off the structure. 249 00:12:40,988 --> 00:12:44,608 And then we'll be doing some pavement improvements around the perimeter of the site 250 00:12:44,668 --> 00:12:45,048 as well. 251 00:12:46,208 --> 00:12:49,708 We'll be putting in some new vehicle charging stations for the electric 252 00:12:49,768 --> 00:12:51,708 vehicles outside the building. 253 00:12:53,088 --> 00:12:56,728 And then we've got some improved landscaping areas that'll take 254 00:12:56,768 --> 00:13:00,598 place at the transition between this property and the Infinity 255 00:13:00,688 --> 00:13:01,088 property. 256 00:13:02,228 --> 00:13:03,948 So we've got some landscaping improvements there. 257 00:13:06,008 --> 00:13:09,948 And then other than that, the major circulation components of the 258 00:13:09,988 --> 00:13:11,408 site are pretty much unchanged. 259 00:13:12,508 --> 00:13:16,488 This property has access from essentially two 260 00:13:16,608 --> 00:13:20,368 adjacent building areas, so there's a site access 261 00:13:20,448 --> 00:13:20,788 from 262 00:13:22,828 --> 00:13:25,348 either side, and that's going to remain. 263 00:13:26,868 --> 00:13:27,748 Let's go here. 264 00:13:29,508 --> 00:13:33,048 So there's a site plan there. So as you can see, this particular property by itself 265 00:13:33,088 --> 00:13:35,928 doesn't have its own curb cut, but there's curb cuts on either side. 266 00:13:36,928 --> 00:13:40,908 And we've just had some discussions with city staff just to make sure 267 00:13:40,948 --> 00:13:44,478 everyone was comfortable with the vehicle circulation around the building, and 268 00:13:45,008 --> 00:13:46,948 really nothing substantial will change there. 269 00:13:48,208 --> 00:13:52,048 Additional sidewalk areas and concrete 270 00:13:52,108 --> 00:13:55,528 vehicle display areas will be kind of prominent in the front part of the 271 00:13:55,588 --> 00:13:56,668 site. 272 00:13:58,008 --> 00:14:00,498 And as far as the lighting on the facility, 273 00:14:01,308 --> 00:14:05,168 there's one existing light pole that will be removed 274 00:14:06,528 --> 00:14:08,108 to make room for the building expansion, 275 00:14:09,008 --> 00:14:12,528 and there's a second light pole that'll be located inside the 276 00:14:13,428 --> 00:14:16,968 landscaped island area that we're retaining, so that light pole will 277 00:14:17,388 --> 00:14:17,808 remain. 278 00:14:19,188 --> 00:14:21,588 So no real changes to the lighting. 279 00:14:21,628 --> 00:14:24,948 We're not upgrading any of the fixtures or anything on the pole-mounted lighting in 280 00:14:25,008 --> 00:14:27,338 the facility, so it's going to basically stay as it is. 281 00:14:29,348 --> 00:14:32,528 The last item that we've been working with the city on is the signage. 282 00:14:32,888 --> 00:14:34,208 We do have 283 00:14:35,898 --> 00:14:37,888 a updated signage that'll happen. 284 00:14:37,948 --> 00:14:41,528 The Kia logo has changed, so updated 285 00:14:41,788 --> 00:14:44,507 signage on the building as well as a new pylon sign. 286 00:14:44,548 --> 00:14:47,568 So there was some language in the memo which just 287 00:14:47,648 --> 00:14:48,808 outlined 288 00:14:50,948 --> 00:14:54,688 our request to basically replace that existing pylon sign that's out front with a 289 00:14:54,728 --> 00:14:58,588 new sign. So those details, again, will be worked 290 00:14:58,668 --> 00:15:02,518 out through code enforcement. As far as the size of the sign, what's allowed, we've 291 00:15:02,548 --> 00:15:04,828 got a few options that we're working through with Kia now. 292 00:15:06,408 --> 00:15:10,328 And we're satisfied that whatever sign we choose, again, we'll just make 293 00:15:10,388 --> 00:15:12,168 sure we work through codes and that it's 294 00:15:14,168 --> 00:15:14,948 no larger than 295 00:15:16,008 --> 00:15:16,908 is permitted. So, 296 00:15:19,408 --> 00:15:22,528 with that, I've got some additional graphics here just showing building elevations 297 00:15:22,568 --> 00:15:26,308 that I can skip to if we need to. Otherwise, happy to 298 00:15:26,317 --> 00:15:28,488 answer your questions if you have any. Thank you. 299 00:15:29,448 --> 00:15:30,148 Thank you, Dustin. 300 00:15:31,488 --> 00:15:32,018 Staff comment? 301 00:15:33,428 --> 00:15:35,158 Nothing to add from Dustin's presentation. 302 00:15:35,388 --> 00:15:38,428 Okay, thank you. With this is also a public comment. 303 00:15:38,668 --> 00:15:42,518 Does anybody from the public wish to speak on this 304 00:15:42,548 --> 00:15:45,388 addition? I see none. Any through Zoom? 305 00:15:46,748 --> 00:15:50,188 If there's anyone participating via Zoom and would like to speak, please raise your 306 00:15:50,228 --> 00:15:50,488 hand. 307 00:15:52,348 --> 00:15:52,908 I'm seeing none. 308 00:15:53,088 --> 00:15:55,628 Okay, thank you. With that, I'll close the public comment. 309 00:15:56,808 --> 00:15:58,048 Any board comments? 310 00:16:01,708 --> 00:16:02,328 Seeing none. 311 00:16:03,128 --> 00:16:03,608 I've got a question. 312 00:16:03,648 --> 00:16:04,808 Yep, sorry. Go ahead, Robin. 313 00:16:04,928 --> 00:16:07,448 Thanks. And Dustin, I remember asking about this last time. 314 00:16:08,248 --> 00:16:11,848 Planting plans, and I know there's not a lot of 315 00:16:11,948 --> 00:16:15,708 area for that, but there's that little corner area that I think already 316 00:16:15,768 --> 00:16:17,468 exists, or actually maybe it's new. 317 00:16:17,588 --> 00:16:21,228 Can you talk about any plans for planting or any street trees? 318 00:16:21,648 --> 00:16:21,768 Yep. 319 00:16:22,688 --> 00:16:24,508 So we do have existing 320 00:16:25,348 --> 00:16:27,148 street trees that run along Saunders. 321 00:16:27,968 --> 00:16:31,648 But yeah, this area right here in this front corner is really kind of our prime 322 00:16:31,768 --> 00:16:33,648 spot to be able to 323 00:16:34,828 --> 00:16:36,578 add some decorative landscaping. 324 00:16:36,688 --> 00:16:40,408 So we do have some trees and shrubs and perennials 325 00:16:40,748 --> 00:16:44,408 in that landscaped area there, which right now it's pretty much grass. 326 00:16:44,448 --> 00:16:48,388 There's a few just evergreen shrubs, no color or anything. 327 00:16:48,508 --> 00:16:51,308 So it looks a little different. When you look at the Infinity building, which is 328 00:16:51,348 --> 00:16:54,148 one of the newer ones that we've done, we've got daylilies and color and things 329 00:16:54,158 --> 00:16:57,968 around the perimeter, so we're trying to kind of match that in the front of the 330 00:16:58,008 --> 00:16:58,488 building here. 331 00:17:04,209 --> 00:17:08,108 Thank you. With the sign, I know on the board or on the 332 00:17:08,128 --> 00:17:11,408 building itself, the front, is that going to be lit up, the Kia s- the... 333 00:17:11,668 --> 00:17:11,798 Because- 334 00:17:11,929 --> 00:17:12,058 Yeah 335 00:17:12,248 --> 00:17:14,308 ... is it already now? Because I don't 336 00:17:16,088 --> 00:17:17,348 go down that direction, but 337 00:17:18,168 --> 00:17:22,108 on the side of the building, so that it just looks like it would look nice 338 00:17:22,168 --> 00:17:24,949 if it was lit up at night, especially with the glass in the front. 339 00:17:25,048 --> 00:17:25,558 So I didn't know 340 00:17:26,368 --> 00:17:28,908 if that was going to be illuminated all the time. 341 00:17:28,918 --> 00:17:28,918 Yep. 342 00:17:28,948 --> 00:17:29,188 Okay. 343 00:17:29,248 --> 00:17:32,688 Yeah, they'll be internally illuminated, especially it's very helpful in the winter 344 00:17:32,728 --> 00:17:34,848 months and stuff when it's dark out at 4:30, and... 345 00:17:36,218 --> 00:17:37,648 Oh, yeah. No, the building looks nice. 346 00:17:38,508 --> 00:17:41,128 It's going to be a nice addition to 347 00:17:42,128 --> 00:17:42,948 the upgrade. So, 348 00:17:44,288 --> 00:17:45,888 with that, we have a motion 349 00:17:47,928 --> 00:17:49,388 on page... 350 00:17:52,368 --> 00:17:53,028 Mr. Chair? 351 00:17:53,088 --> 00:17:53,268 Yes. 352 00:17:53,688 --> 00:17:57,028 I move that the planning board approves the site plan application for 353 00:17:57,188 --> 00:18:01,028 WWS Properties LLC to renovate and expand the existing Bill Dodge 354 00:18:01,128 --> 00:18:05,108 Kia automobile dealership, which includes a 2,160 355 00:18:05,628 --> 00:18:09,608 square foot addition to the service area and a 3,850 square foot 356 00:18:09,788 --> 00:18:13,048 to the showroom. Tax Map 042B, Lot 357 00:18:13,248 --> 00:18:17,168 113, Zone Gateway Commercial. Approval includes the following findings 358 00:18:17,208 --> 00:18:20,628 of facts, conclusions, and conditions as stated on pages five through seven 359 00:18:21,168 --> 00:18:24,888 of the staff memo dated July 31st, 2026, which are 360 00:18:24,908 --> 00:18:26,268 adopted in support of this approval. 361 00:18:26,728 --> 00:18:28,108 Thank you. Can I get a second, please? 362 00:18:29,408 --> 00:18:29,768 Second. 363 00:18:30,568 --> 00:18:32,888 Thank you, Karen. Can I have a roll call vote, Jenna? 364 00:18:35,538 --> 00:18:36,478 Robin Tannenbaum? 365 00:18:37,758 --> 00:18:38,058 Yes. 366 00:18:39,258 --> 00:18:40,298 Nancy Litokapes? 367 00:18:41,038 --> 00:18:41,298 Yes. 368 00:18:42,278 --> 00:18:42,938 Jason Frazier? 369 00:18:43,338 --> 00:18:43,558 Yes. 370 00:18:44,438 --> 00:18:45,298 Karen Axelson? 371 00:18:45,598 --> 00:18:45,858 Yes. 372 00:18:47,118 --> 00:18:47,818 Kevin Price? 373 00:18:48,038 --> 00:18:48,278 Yes. 374 00:18:49,358 --> 00:18:49,998 Lucas Shrake? 375 00:18:50,198 --> 00:18:50,418 Yes. 376 00:18:51,578 --> 00:18:52,358 Oriana Farnham? 377 00:18:52,438 --> 00:18:52,678 Yes. 378 00:18:54,078 --> 00:18:54,718 John Turcotte? 379 00:18:55,098 --> 00:18:55,318 Yes. 380 00:18:56,238 --> 00:18:57,218 And Larry McWilliams. 381 00:18:57,678 --> 00:18:58,018 Yes. 382 00:18:58,938 --> 00:19:01,078 Seeing it's unanimous, thank you. 383 00:19:01,118 --> 00:19:03,438 Orlando, can you read the next item into the record, please? 384 00:19:05,498 --> 00:19:09,198 Item number 26-000275, site 385 00:19:09,278 --> 00:19:12,818 plan subdivision conditional use, Marco Commons, MTR 386 00:19:12,898 --> 00:19:16,678 Development LLC. The applicant is proposing to subdivide a parcel of 387 00:19:16,718 --> 00:19:20,658 vacant land located between 547 and 563 Saco 388 00:19:20,758 --> 00:19:24,518 Street into three lots and develop two of 12-unit 389 00:19:24,978 --> 00:19:28,778 multifamily buildings which will be accessed by a shared private driveway. 390 00:19:29,358 --> 00:19:33,288 Tax map 004, lot 013, zone residential 391 00:19:33,338 --> 00:19:36,398 growth area 2, use dwelling multiple family. 392 00:19:37,478 --> 00:19:37,758 Thank you. 393 00:19:39,498 --> 00:19:41,438 With that, can we have the applicant presentation? 394 00:19:41,698 --> 00:19:42,878 Sure. Yep, me again. 395 00:19:43,058 --> 00:19:43,498 Hi, Dustin. 396 00:19:44,178 --> 00:19:48,078 Dustin Roma with DM Roma Consulting Engineers, representing MTR 397 00:19:48,098 --> 00:19:51,498 Development for this proposed project at 547 Saco Street, 398 00:19:52,398 --> 00:19:56,098 which we've been referring to in the plans as Marco Commons. 399 00:19:57,878 --> 00:20:01,598 So the plan that I've got in front of you here depicts 400 00:20:03,338 --> 00:20:06,038 what we've been calling the first phase of this development. 401 00:20:06,178 --> 00:20:08,838 There's some language in the 402 00:20:09,838 --> 00:20:13,828 packet here which kind of talks about a multiple-phased approach that 403 00:20:13,858 --> 00:20:15,438 we've been working on in this project. 404 00:20:15,478 --> 00:20:18,778 So, this initial phase is going to 405 00:20:19,418 --> 00:20:23,378 divide the property up into four lots. 406 00:20:24,018 --> 00:20:25,998 One of those divisions has already occurred. 407 00:20:26,038 --> 00:20:29,718 So the existing farmhouse that's on the property has been 408 00:20:29,958 --> 00:20:33,878 separated off on its own lot, and that property has since been 409 00:20:34,238 --> 00:20:34,718 conveyed. 410 00:20:36,218 --> 00:20:40,058 And then what we're proposing is the creation of essentially three new 411 00:20:40,138 --> 00:20:42,058 lots on the remaining land. 412 00:20:42,918 --> 00:20:46,518 One lot will be created around an existing barn 413 00:20:46,718 --> 00:20:48,158 structure that's on the property. 414 00:20:48,968 --> 00:20:51,358 The intent is for that building to stay 415 00:20:52,198 --> 00:20:56,078 currently. At some point in the future, the plan would be for 416 00:20:56,138 --> 00:21:00,078 that to be a single-family residential lot 417 00:21:00,378 --> 00:21:04,278 if that building were to be knocked down, but that isn't anything 418 00:21:04,298 --> 00:21:07,558 we're looking to do anytime soon. So we want to kind of keep the barn up there and 419 00:21:08,578 --> 00:21:09,418 utilize it for 420 00:21:10,398 --> 00:21:12,018 whatever uses are permitted in the zone. 421 00:21:14,778 --> 00:21:15,938 One of the lots on the 422 00:21:16,998 --> 00:21:20,258 left-hand side or the Scarborough side of the property, we'll be 423 00:21:20,298 --> 00:21:24,198 creating that lot that is of adequate size for a 424 00:21:24,218 --> 00:21:27,978 duplex. And then the remaining land, 425 00:21:28,178 --> 00:21:30,938 we're currently proposing two 12-unit 426 00:21:31,038 --> 00:21:34,918 buildings for residential use on that remaining 427 00:21:34,958 --> 00:21:35,338 piece. 428 00:21:36,698 --> 00:21:40,318 We did include an overall master plan in our 429 00:21:40,378 --> 00:21:43,598 packets here, which just kind of lays out 430 00:21:43,658 --> 00:21:46,848 what our goal is for an ultimate build-out of this 431 00:21:46,878 --> 00:21:50,358 property. But it's certainly nothing that we're 432 00:21:51,098 --> 00:21:54,458 asking the board to comment or commit on at this time. 433 00:21:54,498 --> 00:21:57,998 We're really just seeking approval for these first two 12-unit 434 00:21:58,038 --> 00:22:01,768 buildings and the division of the property to create the duplex lot and the single 435 00:22:01,878 --> 00:22:02,228 family. 436 00:22:03,058 --> 00:22:06,607 But we did think it was important to continue the discussion with the board so that 437 00:22:06,638 --> 00:22:09,778 everybody can kind of see the vision as to where we hope to end up with this 438 00:22:09,798 --> 00:22:10,898 project here at some point. 439 00:22:12,458 --> 00:22:15,358 But again, what's here tonight is just the two 12-unit buildings on this larger 440 00:22:15,458 --> 00:22:15,758 lot. 441 00:22:17,538 --> 00:22:21,508 This plan shows the extent of a trail network that 442 00:22:21,518 --> 00:22:25,038 we're going to be enhancing and improving. 443 00:22:25,498 --> 00:22:28,818 There are some trails that kind of work their way through the property, but 444 00:22:29,498 --> 00:22:33,118 this shows an area that we're looking to enhance those trails. 445 00:22:33,698 --> 00:22:36,758 So this will be a walking area for the residents of the development, 446 00:22:38,358 --> 00:22:42,258 and this is something that we had presented to the Recreation 447 00:22:42,338 --> 00:22:44,338 Conservation Commission as part of 448 00:22:45,498 --> 00:22:49,258 our open space design requirements, which they've 449 00:22:50,178 --> 00:22:53,418 accepted as being suitable in conjunction with a 450 00:22:53,938 --> 00:22:56,878 off-site sidewalk that we're also proposing as well. 451 00:22:58,678 --> 00:23:02,618 So the off-site sidewalk piece of this is something we've had kind of extensive 452 00:23:02,738 --> 00:23:06,628 conversations and discussions with city staff on, because 453 00:23:06,658 --> 00:23:08,718 it's something that's kind of being 454 00:23:10,418 --> 00:23:12,238 done at the front end of the project. 455 00:23:12,298 --> 00:23:16,238 A lot of times these off-site improvements get done kind of later on, but we 456 00:23:16,258 --> 00:23:20,208 do have some timing constraints with the repaving project that's occurring on 457 00:23:20,438 --> 00:23:23,188 Saco Street, so we've been working kind of closely with the city just to make sure 458 00:23:23,218 --> 00:23:26,958 we're getting all the pieces put in place to work through those time 459 00:23:26,998 --> 00:23:27,518 constraints. 460 00:23:28,678 --> 00:23:32,478 But what's outlined in your proposal here is that we're going to be building 461 00:23:33,498 --> 00:23:37,418 all of the sidewalk out along the frontage of the property as part of this 462 00:23:37,458 --> 00:23:41,078 initial project phase. So it will extend down the 463 00:23:41,138 --> 00:23:45,018 road heading towards Elm Maple Drive, up until 464 00:23:45,238 --> 00:23:48,578 the existing driveway entrance that is at 465 00:23:49,058 --> 00:23:53,038 521 Saco Street. So we'll build up to that location now complete, 466 00:23:53,058 --> 00:23:56,898 and then we'll also head north and bring the sidewalk 467 00:23:57,018 --> 00:24:00,488 up to a point where we're going to be painting a crosswalk across the street, doing 468 00:24:00,518 --> 00:24:04,458 tip downs, and putting in a rapid flashing beacon at that 469 00:24:04,498 --> 00:24:07,138 location to allow people to cross the street there. 470 00:24:07,198 --> 00:24:10,918 So we think these are benefits that'll help the residents of our 471 00:24:10,958 --> 00:24:13,748 neighborhood, but we also have The Hamlet and other neighborhoods around 472 00:24:14,678 --> 00:24:17,998 where folks are coming down. There's a bus stop across the street from our 473 00:24:18,038 --> 00:24:21,968 development. So the thought is that all of these things will 474 00:24:22,018 --> 00:24:25,898 help the pedestrian movements around this area, make it safer, 475 00:24:26,758 --> 00:24:29,238 make people feel like they can use the amenities that are there. 476 00:24:31,358 --> 00:24:34,938 As far as the development itself 477 00:24:36,434 --> 00:24:39,694 Here's a landscaping plan that we're proposing for the project. 478 00:24:39,814 --> 00:24:40,034 So 479 00:24:41,174 --> 00:24:44,554 we've got a single entrance driveway coming in. 480 00:24:44,794 --> 00:24:48,514 That driveway will also serve as the entrance to those other two 481 00:24:48,534 --> 00:24:52,094 lots that we're creating. So the duplex lot and the single-family lot will both be 482 00:24:52,194 --> 00:24:55,714 accessed off this Marco Drive shared 483 00:24:55,954 --> 00:24:59,874 private access way. So no new curb cuts on Saco 484 00:24:59,974 --> 00:25:03,634 Street. The two curb cuts that exist currently that provide kind of a loop 485 00:25:03,734 --> 00:25:06,834 driveway for the farmhouse, one of those will be closed off, 486 00:25:07,574 --> 00:25:10,914 and that existing barn structure will be accessed from this new 487 00:25:12,294 --> 00:25:12,814 driveway. 488 00:25:14,654 --> 00:25:18,634 One of the comments that we received when we had our neighborhood meeting, as well 489 00:25:18,674 --> 00:25:22,614 as when we were last here in front of the planning board for our workshop, was 490 00:25:22,654 --> 00:25:26,524 the proximity of these two proposed multi-family buildings to the 491 00:25:26,574 --> 00:25:30,454 adjacent property to our south at the 521 Saco 492 00:25:30,534 --> 00:25:31,054 Street lot. 493 00:25:32,154 --> 00:25:36,094 So what we did is we've moved the whole project as far away from that 494 00:25:36,114 --> 00:25:39,993 property line as we could. We do have the existing pond and some wetland 495 00:25:40,074 --> 00:25:43,934 areas that are on that northern side of the property, so we basically 496 00:25:43,974 --> 00:25:46,674 pulled everything as far away from that property line as possible. 497 00:25:46,714 --> 00:25:50,074 And this is substantially more 498 00:25:51,354 --> 00:25:53,514 separation there than what it was previously. 499 00:25:54,314 --> 00:25:57,734 We've also angled the development a little bit, so it's not 500 00:25:57,794 --> 00:26:01,714 necessarily looking right straight into 501 00:26:01,754 --> 00:26:02,334 the property, 502 00:26:03,214 --> 00:26:06,034 just so that you're not looking directly at the backside of those buildings. 503 00:26:06,594 --> 00:26:10,334 In moving those buildings away from the property line, we're also able to 504 00:26:10,874 --> 00:26:14,834 retain all of the trees that are along that property line currently. 505 00:26:14,894 --> 00:26:18,044 With the old design, we could have retained them as well, but we would have been 506 00:26:18,054 --> 00:26:21,544 very close to them. This way, we've got plenty of space pulling those 507 00:26:21,574 --> 00:26:23,694 away from that property line. 508 00:26:26,154 --> 00:26:26,914 Let's see. 509 00:26:33,794 --> 00:26:34,754 I think at this point, 510 00:26:36,154 --> 00:26:39,514 again, we appreciate staff working with us up to this point 511 00:26:40,434 --> 00:26:42,254 with all the upfront planning. 512 00:26:43,434 --> 00:26:45,283 And I know the applicant is 513 00:26:46,814 --> 00:26:48,554 ready to start this project here 514 00:26:49,514 --> 00:26:53,374 as soon as approvals are granted. So this is kind of their next project to 515 00:26:53,414 --> 00:26:54,854 move into. So 516 00:26:56,254 --> 00:26:59,254 I think we've addressed the comments that have been brought to us to date. 517 00:26:59,534 --> 00:27:03,414 There are a few things in the memo here just in regard to how we're going to 518 00:27:03,494 --> 00:27:06,494 separate the subdivision plan, the site plan, 519 00:27:08,054 --> 00:27:11,534 putting notes on those so we can kind of have separate recording plans and separate 520 00:27:11,574 --> 00:27:15,534 approval plans. So all that information's got some good instructions here 521 00:27:15,574 --> 00:27:18,374 in the packet that we can incorporate. 522 00:27:20,834 --> 00:27:22,434 And we're prepared to do that, and 523 00:27:23,434 --> 00:27:24,734 it seems pretty straightforward. 524 00:27:27,874 --> 00:27:31,554 I think there was a couple other things in the memo just in regard to the 525 00:27:31,594 --> 00:27:34,494 city's involvement going forward with the sidewalk area. 526 00:27:34,974 --> 00:27:36,734 But I think maybe I'll just let 527 00:27:38,314 --> 00:27:41,954 Rebecca elaborate a little bit on that just so I don't misspeak on any of 528 00:27:42,514 --> 00:27:46,494 the things that the city is proposing to step up and assist with on that end. 529 00:27:46,594 --> 00:27:46,734 So 530 00:27:47,974 --> 00:27:50,954 with that, I'll turn it over and we're here to answer questions. 531 00:27:51,354 --> 00:27:52,034 Thank you, Dustin. 532 00:27:53,954 --> 00:27:55,374 Staff response with that, would you? 533 00:27:57,174 --> 00:27:57,534 Yeah. 534 00:27:58,494 --> 00:28:02,174 So what's before the board right now, there's actually kind of two applications 535 00:28:02,214 --> 00:28:05,894 happening, so I just want to reiterate that what is up for looking for approval 536 00:28:05,934 --> 00:28:09,924 tonight. There's the land subdivision, and then step into what's 537 00:28:09,934 --> 00:28:12,214 being identified in the plans as lots one, two, and three. 538 00:28:12,834 --> 00:28:16,054 As Dustin said, there is technically a fourth lot, but that was carved off 539 00:28:16,134 --> 00:28:19,994 previously. Per subdivision law, it's a subdivision once 540 00:28:20,174 --> 00:28:24,114 a parcel becomes three parcels within a five-year period. 541 00:28:24,464 --> 00:28:28,274 And so legally they were able to carve off one lot, but as soon as they're 542 00:28:28,334 --> 00:28:31,134 creating a second lot, that's what triggers the subdivision review. 543 00:28:31,754 --> 00:28:35,604 So the lot that's been carved off is already legally a separated lot, and 544 00:28:35,654 --> 00:28:38,774 before the board is the creation of the three now new lots. 545 00:28:40,414 --> 00:28:44,374 With that, as Dustin said, lots one and two are proposed to 546 00:28:44,414 --> 00:28:46,794 have shared access off of Marco Drive. 547 00:28:47,534 --> 00:28:50,094 They will not have separate curb cuts onto Saco Street. 548 00:28:51,494 --> 00:28:52,114 And 549 00:28:54,354 --> 00:28:58,284 then lot three is a separate site plan subdivision, which is 550 00:28:58,314 --> 00:29:01,514 currently the two 12-unit structures that you see before 551 00:29:01,574 --> 00:29:04,374 you. A couple other points I wanted to touch on. 552 00:29:04,774 --> 00:29:08,474 So the Recreation and Conservation Commission, as Dustin said, reviewed 553 00:29:08,694 --> 00:29:10,954 this plan. The overall 554 00:29:11,854 --> 00:29:15,514 open space plan here is a little unusual for how we typically do things. 555 00:29:16,074 --> 00:29:20,014 But given the design here, clustering, we looked at 556 00:29:20,054 --> 00:29:23,154 the overall master plan. We really didn't want to separate this out into phase one 557 00:29:23,194 --> 00:29:26,583 when we knew the overall master plan was coming, and generally planning and 558 00:29:26,634 --> 00:29:28,164 development is better when you look at the overall. 559 00:29:28,594 --> 00:29:31,714 So they clustered the development as close as they could towards Saco Street to 560 00:29:31,754 --> 00:29:34,534 preserve that 12 acres towards the back. 561 00:29:34,814 --> 00:29:38,114 They're also proposing a small loop trail back there. 562 00:29:38,594 --> 00:29:39,994 And then along with that, 563 00:29:40,894 --> 00:29:44,774 given the extensive public benefit and improvements 564 00:29:44,874 --> 00:29:47,754 of the Saco Street sidewalk, although it is a 565 00:29:47,994 --> 00:29:51,914 general requirement for any development to provide pedestrian access, 566 00:29:52,314 --> 00:29:55,824 we felt it was reasonable to include the efforts being made here where they 567 00:29:55,914 --> 00:29:59,834 are sort of above a standard sort 568 00:29:59,854 --> 00:30:03,554 of requirement and development, include that in with the open space given the 569 00:30:03,634 --> 00:30:06,694 sidewalk is public recreation for the general public. 570 00:30:07,034 --> 00:30:11,014 So those three elements together is what went to the 571 00:30:11,034 --> 00:30:14,994 commission. The commission supported this, but did include a recommendation for 572 00:30:15,094 --> 00:30:17,254 public access to the rear of the property. 573 00:30:19,214 --> 00:30:22,374 Staff reviewed this afterwards and found that 574 00:30:23,114 --> 00:30:26,894 where this parcel doesn't abut another public property, 575 00:30:27,083 --> 00:30:30,954 an existing trail system, historically we've seen just some 576 00:30:31,054 --> 00:30:34,994 conflict that can occur when public is walking through a private development 577 00:30:35,014 --> 00:30:37,744 and the private development doesn't understand why they're there, they're not 578 00:30:37,814 --> 00:30:41,714 there. So without some kind of a connection 579 00:30:41,774 --> 00:30:45,394 to an existing system, staff would support this remaining a benefit for the 580 00:30:45,594 --> 00:30:49,534 private development, and then the public benefit is that sidewalk along 581 00:30:49,874 --> 00:30:50,474 Saco Street. 582 00:30:53,898 --> 00:30:56,618 Also, I wanted to touch on the Saco Street sidewalk a bit. 583 00:30:56,678 --> 00:30:59,978 This is a little confusing, so I'm going to try to explain it, and if you have any 584 00:31:00,038 --> 00:31:01,398 questions, please jump in. 585 00:31:03,118 --> 00:31:03,258 Oh, 586 00:31:05,218 --> 00:31:06,638 I'm glad you have the building elevations. 587 00:31:06,718 --> 00:31:07,318 I was hoping you could- 588 00:31:07,358 --> 00:31:07,368 Yeah 589 00:31:07,368 --> 00:31:09,698 ... show those to the board as well again. 590 00:31:10,418 --> 00:31:14,058 Some of the challenges facing with this, it's about 1,300 feet 591 00:31:14,238 --> 00:31:18,008 of sidewalk from the Spiller Drive to the existing Elm 592 00:31:18,078 --> 00:31:20,438 Maple where the existing infrastructure ends. 593 00:31:21,758 --> 00:31:25,678 As part of this phase, Dustin created a sidewalk design, and that sidewalk 594 00:31:25,738 --> 00:31:29,458 design identified several areas where there would need to be 595 00:31:31,518 --> 00:31:35,308 easements on private property, either for grading or a couple feet of the 596 00:31:35,398 --> 00:31:39,118 sidewalk in order to maintain the five-foot shoulder that is on 597 00:31:39,158 --> 00:31:43,068 Saco Street. There could have been an option where the developer reduced 598 00:31:43,078 --> 00:31:46,298 that five-foot shoulder, and everything was able to remain within the right of way. 599 00:31:46,738 --> 00:31:50,218 However, staff find that shoulder is important for the use of 600 00:31:50,238 --> 00:31:54,158 bicyclists and didn't support reducing that below five feet. 601 00:31:54,268 --> 00:31:58,118 And so, that is what resulted in, there are two locations 602 00:31:59,338 --> 00:32:00,998 where there would be right-of-way impacts. 603 00:32:01,578 --> 00:32:05,528 So, that's how we got to this place of proposing 604 00:32:05,558 --> 00:32:07,698 to phase the sidewalk installation. 605 00:32:07,738 --> 00:32:11,438 The development is satisfying the pedestrian connectivity element 606 00:32:11,478 --> 00:32:14,938 by extending the sidewalk towards Spiller and installing the 607 00:32:14,978 --> 00:32:18,018 crosswalk to the existing sidewalk on the other side of Saco Street, 608 00:32:18,838 --> 00:32:22,178 and also installing the curb all the way down to Elm Maple. 609 00:32:22,838 --> 00:32:26,408 And the reason that's important is because once Saco Street pavement goes down, 610 00:32:26,498 --> 00:32:29,738 there's a moratorium, and you can't disturb the pavement even to put curbing down. 611 00:32:29,998 --> 00:32:33,558 So the curbing is down, which means the sidewalk can go in whenever it's ready. 612 00:32:34,638 --> 00:32:38,618 With that, the city is going to take on the responsibility to work 613 00:32:38,638 --> 00:32:42,118 with the individual private landowners and finalize 614 00:32:42,158 --> 00:32:45,638 whatever needs to be made in order for this sidewalk to move forward, 615 00:32:46,238 --> 00:32:46,818 where 616 00:32:48,698 --> 00:32:52,578 we see a strong public benefit here, and an overall goal to extend 617 00:32:52,618 --> 00:32:54,658 this sidewalk eventually down to the neighborhoods 618 00:32:55,758 --> 00:32:57,398 towards the Scarborough's town line, The Hamlet. 619 00:32:58,058 --> 00:33:01,818 So, the city has agreed to take that conversation on. 620 00:33:02,367 --> 00:33:06,098 And then with that, the development would be required to actually 621 00:33:06,138 --> 00:33:09,718 install the infrastructure and the sidewalk as part of their next phase of 622 00:33:09,758 --> 00:33:10,238 development. 623 00:33:11,098 --> 00:33:15,058 We found this to be a fair private-public partnership, 624 00:33:15,538 --> 00:33:18,978 understanding that the actual request right now is just two 625 00:33:19,138 --> 00:33:21,398 multifamily. We're not talking about the full build-out. 626 00:33:21,828 --> 00:33:25,798 So for the two multifamily, we are achieving that pedestrian connectivity. 627 00:33:25,838 --> 00:33:29,798 And then for the overall build-out, when that comes back, that's when the heavier 628 00:33:29,838 --> 00:33:31,978 lift of the full sidewalk installation would 629 00:33:32,978 --> 00:33:33,278 occur. 630 00:33:34,378 --> 00:33:36,378 That's if you get the right of way, is that correct? 631 00:33:37,678 --> 00:33:39,818 What if there's opposition for the right of way? 632 00:33:41,218 --> 00:33:42,938 We'd have that conversation at that time. 633 00:33:44,078 --> 00:33:45,658 I don't know, maybe there are other options. 634 00:33:45,758 --> 00:33:49,318 Maybe there's an area where the sidewalk would be reduced in si-- I'm not really 635 00:33:49,358 --> 00:33:53,178 sure what that conversation would be, but it seems like a conversation that 636 00:33:53,218 --> 00:33:56,738 was more appropriate for the city to have with the individual landowners instead of 637 00:33:56,778 --> 00:33:57,318 the developer. 638 00:33:57,518 --> 00:33:57,758 Okay. 639 00:33:58,758 --> 00:33:59,038 Thanks. 640 00:33:59,258 --> 00:33:59,538 Mm-hmm. 641 00:33:59,598 --> 00:34:01,598 I'd like to see what that update would be, for sure. 642 00:34:02,378 --> 00:34:04,358 Putting the curb in, for one thing, is a plus- 643 00:34:04,578 --> 00:34:04,758 Mm-hmm 644 00:34:04,838 --> 00:34:06,758 ... with the moratorium, because then it can be added on. 645 00:34:07,878 --> 00:34:11,718 And with the phases, what type of timeframe are we 646 00:34:11,738 --> 00:34:13,379 even talking about phasing on this? 647 00:34:14,379 --> 00:34:18,298 Yeah. I think the goal is to do two buildings a year, 648 00:34:18,498 --> 00:34:21,298 so we'd be back probably sometime, 649 00:34:22,778 --> 00:34:26,419 maybe in the spring or over the winter to come back and talk about the next phase 650 00:34:26,458 --> 00:34:27,098 of development. 651 00:34:29,678 --> 00:34:31,178 So yeah, that's our intended schedule. 652 00:34:31,958 --> 00:34:32,798 Okay. Thank you. 653 00:34:35,038 --> 00:34:37,938 This is also a public comment area as well. 654 00:34:37,948 --> 00:34:40,538 Does anybody from the public wish to speak on this project? 655 00:34:43,899 --> 00:34:45,958 I see none. Anybody on Zoom? 656 00:34:46,839 --> 00:34:50,518 I think that there's- 657 00:34:50,638 --> 00:34:53,899 You want to come up? Yeah, come on up. State your name, your address. 658 00:34:55,598 --> 00:34:57,278 You have three minutes to speak, so... 659 00:34:58,018 --> 00:34:58,267 Got it. 660 00:34:59,258 --> 00:35:00,728 My name is Kathy Gorham, 661 00:35:01,738 --> 00:35:05,038 and we have lived at 521 Saco Street for 662 00:35:06,218 --> 00:35:07,698 over 49 years. 663 00:35:09,038 --> 00:35:12,378 When I was here at the previous meeting, I realized I'm in the older 664 00:35:12,838 --> 00:35:16,598 generation here and got a little overwhelmed with what all was going 665 00:35:16,638 --> 00:35:20,118 on. I have to say, I do appreciate some of the accommodations 666 00:35:20,598 --> 00:35:23,918 that I heard about tonight. It would've been nice to have known about a little bit 667 00:35:23,938 --> 00:35:27,898 more ahead of time, because that was part of what I would be 668 00:35:27,958 --> 00:35:30,978 talking about. But, he's already addressing some of the 669 00:35:32,118 --> 00:35:34,418 concerns that I had, and we had 670 00:35:35,518 --> 00:35:35,978 before. 671 00:35:37,118 --> 00:35:40,698 I know one part of when I was here before, that a big 672 00:35:40,738 --> 00:35:44,618 concern about affordable housing, which I think everybody is concerned 673 00:35:44,698 --> 00:35:48,608 about. I think Westbrook is doing more than their share in providing 674 00:35:48,658 --> 00:35:48,878 it. 675 00:35:50,138 --> 00:35:53,778 Our concern is that Saco Street's been the location 676 00:35:53,918 --> 00:35:57,808 of single-family homes from the 1700s 677 00:35:57,858 --> 00:35:58,998 up to recently built 678 00:35:59,898 --> 00:36:01,858 new developments. And, 679 00:36:05,298 --> 00:36:09,168 I have my notes here tonight. So, over the years, 680 00:36:09,478 --> 00:36:12,518 various differences of intrusions have been allowed to 681 00:36:13,238 --> 00:36:14,738 complicate it, kind of like the mix. 682 00:36:14,798 --> 00:36:18,257 It's been residential, and then not residential, and then residential. 683 00:36:22,898 --> 00:36:26,518 One concern that I know probably isn't even appropriate here is that that 684 00:36:26,738 --> 00:36:30,438 farmhouse that got sold is going to be, I believe, some sort of a halfway 685 00:36:30,498 --> 00:36:33,798 house, which would definitely have an impact on our neighborhood. 686 00:36:33,848 --> 00:36:35,978 And that apparently doesn't come under any type of 687 00:36:38,238 --> 00:36:41,358 logic that needs to come up into public 688 00:36:43,038 --> 00:36:45,198 interest other than to us. 689 00:36:46,278 --> 00:36:49,598 Now, the total, I believe, is 172, although we've heard 690 00:36:49,678 --> 00:36:51,898 184 planned units out back. 691 00:36:53,958 --> 00:36:57,518 I'm sure everybody can do the math and figure out there are going to be 692 00:36:57,894 --> 00:37:00,854 Equal or more than those numbers of vehicles 693 00:37:02,634 --> 00:37:04,154 entering and leaving Saco Street, 694 00:37:05,314 --> 00:37:09,294 which should be renamed Saco Speedway, because 695 00:37:09,334 --> 00:37:13,054 we've got a 45 speed limit out in front of our house, and believe me, 696 00:37:13,974 --> 00:37:16,714 they go then and above all the time. 697 00:37:17,134 --> 00:37:21,044 So then if you're going to have another 200 vehicles going on and off right 698 00:37:21,074 --> 00:37:21,304 there, 699 00:37:22,174 --> 00:37:25,574 that is going to be a problem for I think everybody who lives on Saco Street. 700 00:37:30,474 --> 00:37:31,274 A lot of people have 701 00:37:32,674 --> 00:37:36,434 built homes and bought homes in that area with the 702 00:37:36,474 --> 00:37:37,514 idea that 703 00:37:38,774 --> 00:37:42,644 they would have a long-term residence in a desirable area, and 704 00:37:42,834 --> 00:37:46,394 I don't think this particular project is going to really 705 00:37:46,454 --> 00:37:49,534 enhance that. It's not really going to be considered what 706 00:37:50,214 --> 00:37:52,974 people bought into in a desired area at the time. 707 00:37:53,294 --> 00:37:56,294 I realize it's late in the project and probably nothing anybody's going to do 708 00:37:56,374 --> 00:38:00,354 about, but you need to understand that the people that live there, 709 00:38:01,314 --> 00:38:01,973 it's a big deal. 710 00:38:02,833 --> 00:38:05,014 It's a big deal to have that happening. 711 00:38:05,614 --> 00:38:06,894 It seems like we've considered 712 00:38:09,734 --> 00:38:13,714 housing, we've considered developers, but nobody seems to stop 713 00:38:13,734 --> 00:38:15,014 and think about the people. 714 00:38:16,374 --> 00:38:18,574 Am I up with my three minutes already? 715 00:38:18,614 --> 00:38:19,394 Just keep it short- 716 00:38:19,524 --> 00:38:19,524 Okay. 717 00:38:19,524 --> 00:38:22,134 ... and if you can, I'll allow you to still speak. 718 00:38:22,354 --> 00:38:23,114 All right. Thank you. 719 00:38:25,194 --> 00:38:28,874 I've lost my train of thought. It happens a lot. 720 00:38:31,534 --> 00:38:31,894 Anyway, 721 00:38:34,574 --> 00:38:37,114 I've lost my notes, but anyway. We 722 00:38:38,174 --> 00:38:40,774 know that that place wasn't going to stay vacant. 723 00:38:40,814 --> 00:38:41,294 It was a 724 00:38:42,094 --> 00:38:44,594 farm for many years. We knew it wasn't going to stay vacant. 725 00:38:45,594 --> 00:38:48,954 But we were hoping there'd be something more compatible with the neighborhood, 726 00:38:49,014 --> 00:38:51,634 because it's a neighborhood. It's been there a long time and it's still a 727 00:38:51,674 --> 00:38:54,274 neighborhood. A lot of families living there. 728 00:38:54,354 --> 00:38:57,794 A lot of new homes have been approved to be built there. 729 00:38:58,554 --> 00:38:58,854 And 730 00:38:59,894 --> 00:39:03,694 we just are disappointed that hasn't been given more 731 00:39:03,734 --> 00:39:05,314 consideration to those of us 732 00:39:06,134 --> 00:39:09,594 that still live there. Probably will live there a little bit longer. 733 00:39:10,214 --> 00:39:10,494 And 734 00:39:12,814 --> 00:39:14,634 that's pretty much it. And I 735 00:39:16,974 --> 00:39:20,734 just know from talking to my neighbors and myself having lived there for a long 736 00:39:20,774 --> 00:39:24,414 time, that it's disappointing that that type of a 737 00:39:24,814 --> 00:39:27,874 project is being allowed, and that would've been 738 00:39:27,974 --> 00:39:30,194 a better way of approaching it. 739 00:39:31,264 --> 00:39:34,314 Probably a done deal at this point, but just so you know. 740 00:39:35,254 --> 00:39:35,554 Thank you. 741 00:39:35,794 --> 00:39:36,474 Thank you, Kathy. 742 00:39:38,394 --> 00:39:39,174 Anybody else? 743 00:39:42,474 --> 00:39:43,894 Is there anybody through Zoom? 744 00:39:45,014 --> 00:39:48,934 If there's anyone participating via Zoom and would like to speak, please raise your 745 00:39:48,944 --> 00:39:49,973 hand. 746 00:39:51,994 --> 00:39:53,134 I'm seeing none. 747 00:39:53,174 --> 00:39:53,954 Okay. Thank you. 748 00:39:57,754 --> 00:40:00,274 With that, I'm going to close the public comment, public hearing. 749 00:40:01,054 --> 00:40:01,574 Dustin, 750 00:40:02,614 --> 00:40:05,854 would you like to address a couple of these issues, maybe 751 00:40:05,914 --> 00:40:09,554 affordability? I don't know how many might be 752 00:40:09,574 --> 00:40:13,534 affordable part of the housing. Is there rumors of a halfway house with the 753 00:40:13,574 --> 00:40:14,814 barn being taken down? 754 00:40:15,834 --> 00:40:17,674 This is the first time hearing it, so. 755 00:40:17,714 --> 00:40:17,934 Yeah. 756 00:40:19,314 --> 00:40:22,054 And I know with traffic, its traffic concerns are 757 00:40:22,894 --> 00:40:26,834 all over the place, and I know we're trying to, at the council 758 00:40:26,914 --> 00:40:29,294 meeting last night, it was even mentioned more and more. 759 00:40:29,334 --> 00:40:33,034 I know we don't have any control here with the speed 760 00:40:33,454 --> 00:40:36,294 control on any of the streets in Westboro. 761 00:40:36,374 --> 00:40:38,734 It gets out of control, and I don't think that anybody is 762 00:40:39,534 --> 00:40:42,954 really taking the time to slow it down. 763 00:40:43,234 --> 00:40:46,634 So, I understand your concerns with the speed limit at 60 mile an hour. 764 00:40:46,694 --> 00:40:49,074 I see people do on Saco Street sometimes. 765 00:40:50,214 --> 00:40:54,174 But yeah, maybe you can just address some of those concerns. 766 00:40:55,894 --> 00:40:57,304 Yeah. As far as the 767 00:40:58,454 --> 00:41:01,474 existing farmhouse, all I know is that the applicant, 768 00:41:02,274 --> 00:41:04,854 they divided that off, and they did 769 00:41:05,694 --> 00:41:07,614 donate it to his church. 770 00:41:09,034 --> 00:41:10,654 So, that was a donation that was made. 771 00:41:10,714 --> 00:41:13,813 And as far as what the church will use it for, I don't know. 772 00:41:15,193 --> 00:41:17,734 But that's the limit of what I know about that. 773 00:41:20,134 --> 00:41:24,094 And then, as far as the units themselves, I know 774 00:41:26,794 --> 00:41:28,124 some of the neighbors, I 775 00:41:28,934 --> 00:41:30,484 know they have a preference for 776 00:41:31,534 --> 00:41:35,394 single-family development. And they had expressed 777 00:41:35,454 --> 00:41:39,314 their desire that they would've preferred if this was like another L Maple 778 00:41:39,374 --> 00:41:43,234 Drive or something like that, that kind of continued through and had all 779 00:41:43,294 --> 00:41:44,374 single-family homes. 780 00:41:46,074 --> 00:41:46,514 Certainly, 781 00:41:48,234 --> 00:41:49,614 different options were kind of 782 00:41:51,034 --> 00:41:52,474 considered a little bit here in the beginning. 783 00:41:52,534 --> 00:41:54,534 I know this particular builder, 784 00:41:55,474 --> 00:41:59,374 when they look to purchase properties throughout the city and do 785 00:41:59,534 --> 00:42:03,374 development, the intent is to do these projects where 786 00:42:03,414 --> 00:42:07,274 they build them and keep the properties and maintain them themselves 787 00:42:07,334 --> 00:42:10,234 and create these rental units. 788 00:42:11,354 --> 00:42:14,134 So, that wasn't something that they had purchased the property 789 00:42:15,114 --> 00:42:18,874 with the intent of pursuing as a single-family type residential neighborhood. 790 00:42:20,034 --> 00:42:23,964 That would be something where they would buy it and develop a bunch of lots and 791 00:42:24,054 --> 00:42:27,934 sell them and then move on. Instead, this is one where they're looking to 792 00:42:27,954 --> 00:42:31,574 make a long-term investment in Westboro and continue to maintain this 793 00:42:31,594 --> 00:42:35,194 property. And they've got a lot of other nice properties 794 00:42:35,254 --> 00:42:38,534 around the city where they've maintained them very nicely. 795 00:42:38,634 --> 00:42:38,814 So, I 796 00:42:40,494 --> 00:42:44,254 understand the skepticism going into this, and I'm hoping we can prove 797 00:42:44,274 --> 00:42:48,064 everybody wrong, that this is a very nice addition to this neighborhood and it'll 798 00:42:48,114 --> 00:42:52,004 complement what they've got going on as opposed to being something that 799 00:42:52,014 --> 00:42:53,654 they look at and are disappointed in. 800 00:42:53,714 --> 00:42:53,814 So, 801 00:42:54,974 --> 00:42:58,414 I do think it is helpful to at least look at the buildings as well. 802 00:42:58,514 --> 00:43:02,354 I know there's some developments around the city that maybe 803 00:43:02,414 --> 00:43:06,044 folks look at and wish the buildings maybe were a little different, and I'm 804 00:43:06,534 --> 00:43:09,334 hoping that this style of development with the 805 00:43:09,794 --> 00:43:12,574 large pitch roofs, the half stories above, 806 00:43:13,674 --> 00:43:17,634 this, I think, will fit in very nicely on this property and certainly 807 00:43:17,734 --> 00:43:19,994 lends itself to that residential character 808 00:43:21,074 --> 00:43:22,374 type of development. So, 809 00:43:23,294 --> 00:43:25,254 I think this is 810 00:43:27,026 --> 00:43:30,646 I think a nice, attractive looking building, and I think it'll fit well in the 811 00:43:30,746 --> 00:43:31,206 area. 812 00:43:36,706 --> 00:43:39,266 And how about the affordability standpoint? 813 00:43:39,426 --> 00:43:42,386 I know with a development of this size, 814 00:43:44,026 --> 00:43:47,786 with a percentage going to low income or more 815 00:43:47,826 --> 00:43:49,766 affordable housing, is anything on 816 00:43:50,786 --> 00:43:53,516 the proposal to give some marketable rates? 817 00:43:53,766 --> 00:43:55,676 Or is it going to be all market rate rentals? 818 00:43:58,706 --> 00:44:02,046 Yeah. There wasn't a plan, per se, to 819 00:44:02,306 --> 00:44:05,926 designate a certain number of units as meeting the federal standards of 820 00:44:05,946 --> 00:44:09,866 affordability and going through that whole HUD process of pre-qualifying 821 00:44:09,906 --> 00:44:13,646 and all of that. I will say that this project incorporates 822 00:44:14,186 --> 00:44:15,506 some one-bedroom units. 823 00:44:16,606 --> 00:44:20,546 I think what we've heard from some people is that there's a lot 824 00:44:20,586 --> 00:44:24,166 of folks out there that really only need a one-bedroom unit, and that's kind of the 825 00:44:24,206 --> 00:44:25,666 price point that they'd like to be in. 826 00:44:26,226 --> 00:44:30,086 But due to the lack of inventory, or maybe 827 00:44:30,096 --> 00:44:33,726 they're only in buildings that only have one unit or are single-bedroom 828 00:44:33,806 --> 00:44:37,616 units. For them to be able to be in a neighborhood like this 829 00:44:37,666 --> 00:44:41,486 one with a one-bedroom unit that's a little bit more affordable, if that's all the 830 00:44:41,566 --> 00:44:42,486 space that they need. 831 00:44:43,986 --> 00:44:47,906 The entire third story of these buildings, they'll have 832 00:44:47,926 --> 00:44:48,726 the four 833 00:44:50,426 --> 00:44:54,306 single-bedroom units, which would be reduced rent compared to the two-bedroom 834 00:44:54,386 --> 00:44:58,146 units. So it does introduce an affordable option 835 00:44:58,226 --> 00:45:01,786 for folks that may not need the extra space, where they can still get into the same 836 00:45:01,846 --> 00:45:05,166 neighborhood as somebody that's going to be paying the two-bedroom rate, but they 837 00:45:05,206 --> 00:45:07,166 can be in at a lesser rate for the one bedroom. 838 00:45:07,766 --> 00:45:09,006 Right. Thank you for that. 839 00:45:10,306 --> 00:45:11,726 Do we have any other board comments? 840 00:45:13,906 --> 00:45:14,246 Robin? 841 00:45:16,346 --> 00:45:20,286 Thank you. I want to recognize all the work you did to move this around on the 842 00:45:20,326 --> 00:45:23,806 site. I don't remember specifically, but I know it was much closer to the other 843 00:45:23,826 --> 00:45:25,926 neighborhood, and I think it's a nice solution. 844 00:45:27,986 --> 00:45:31,976 And I do think it's among the more attractive multi-family buildings for sort of a 845 00:45:32,046 --> 00:45:35,046 big box that we've seen. It really is, around the city. 846 00:45:35,106 --> 00:45:38,546 So I want to thank your applicant for that. 847 00:45:38,606 --> 00:45:40,566 And because you know I can't resist, 848 00:45:42,626 --> 00:45:44,186 so looking at the plans, 849 00:45:45,146 --> 00:45:48,566 the way the entries work, they're actually on the sides is what I realize. 850 00:45:48,626 --> 00:45:49,006 You walk 851 00:45:50,766 --> 00:45:54,346 on the sidewalks, and the face that faces the parking 852 00:45:54,386 --> 00:45:58,086 lot is kind of the back. And the entries, there's two 853 00:45:58,166 --> 00:46:00,446 corridors, are the sides. 854 00:46:01,826 --> 00:46:02,666 If you guys look at 855 00:46:05,186 --> 00:46:08,726 GU-1. If you look at the plans and look at the site plan, you see that. 856 00:46:08,966 --> 00:46:12,755 And what I want to point out on that is that the mechanical shed, which is the 857 00:46:12,786 --> 00:46:15,886 utility shed, faces the parking lot, and it's the public side. 858 00:46:15,946 --> 00:46:17,475 And it's private property. I 859 00:46:19,446 --> 00:46:22,466 don't know if there's a design guideline that speaks against it, but I would 860 00:46:22,506 --> 00:46:25,726 certainly recommend, because it's a really nice building, that you find a way to 861 00:46:25,766 --> 00:46:28,226 put that. Just flip it so that's on the back. 862 00:46:28,466 --> 00:46:30,426 It's probably for access for service. 863 00:46:30,946 --> 00:46:34,726 It would mean adding a sidewalk, but it's a very 864 00:46:34,786 --> 00:46:38,366 nice building, and you're going to drive in and see the mechanical shed. 865 00:46:39,706 --> 00:46:43,406 Do you see what I mean? Those bays on the gable end, those are 866 00:46:43,446 --> 00:46:46,186 actually the sides, not the front and back. 867 00:46:48,166 --> 00:46:50,626 So the face of the building. I think there's another one. 868 00:46:52,906 --> 00:46:53,986 Go to the elevations. 869 00:46:56,046 --> 00:46:56,646 Go up one. 870 00:46:58,166 --> 00:46:59,626 Yeah. These are the ones here. 871 00:47:01,266 --> 00:47:03,646 Go up one. Do I have actual elevations in our... Oh, maybe you don't have them. 872 00:47:03,706 --> 00:47:06,116 Oh, yeah. These are separate slides, so I didn't- 873 00:47:06,166 --> 00:47:06,315 Yeah. It's two different- 874 00:47:06,315 --> 00:47:07,706 I didn't bring the all four sides. 875 00:47:08,006 --> 00:47:08,016 Okay. 876 00:47:08,016 --> 00:47:08,626 But yeah. 877 00:47:08,686 --> 00:47:08,786 Yeah. 878 00:47:09,046 --> 00:47:09,126 Sorry. 879 00:47:09,186 --> 00:47:10,636 If people look at their packets, 880 00:47:11,506 --> 00:47:14,746 it's the west elevation as it's shown. 881 00:47:14,946 --> 00:47:18,866 And again, it's never going to be the front elevation facing it, but it feels 882 00:47:18,886 --> 00:47:20,116 like a shame for such a lovely 883 00:47:21,406 --> 00:47:22,946 building. That's what I have to say. 884 00:47:24,946 --> 00:47:26,086 Thank you, Robin. 885 00:47:26,906 --> 00:47:28,826 I can echo on that, too. The building's not square. 886 00:47:29,366 --> 00:47:33,246 They've not plain. They put 887 00:47:33,286 --> 00:47:34,986 some architectural skill to it. 888 00:47:35,826 --> 00:47:38,346 And I know it falls within city ordinances, 889 00:47:39,146 --> 00:47:42,606 so we basically have to follow the city ordinances as far as 890 00:47:43,346 --> 00:47:46,986 what is allowed to be put into a certain 891 00:47:47,066 --> 00:47:47,366 area. 892 00:47:49,166 --> 00:47:49,346 So 893 00:47:50,546 --> 00:47:53,206 with that, we can't tell you to put in single families. 894 00:47:53,266 --> 00:47:55,766 Yes, but I'd like to see more single family homes as well. 895 00:47:56,006 --> 00:47:58,926 I know that they're almost unachievable now with the price range of where they're 896 00:47:58,966 --> 00:48:02,926 at. So more and more people have to find rentable places, and trying to 897 00:48:02,946 --> 00:48:04,666 get density into the city is 898 00:48:06,206 --> 00:48:09,086 definitely a help to bring workforce and so forth in. 899 00:48:09,766 --> 00:48:13,546 So with the design aspect of it and the phasing with the 900 00:48:13,586 --> 00:48:14,736 sidewalks, I 901 00:48:15,946 --> 00:48:18,986 can't see anything wrong with proceeding with this project. 902 00:48:20,046 --> 00:48:22,006 Does anybody else have any other comments? 903 00:48:23,026 --> 00:48:23,366 Karen? 904 00:48:23,726 --> 00:48:27,566 Yeah. I just had a question. On here, and you said 905 00:48:27,626 --> 00:48:30,926 they donated the property to the church. 906 00:48:31,106 --> 00:48:31,206 Mm-hmm. 907 00:48:31,306 --> 00:48:33,046 Is that zoned? 908 00:48:34,766 --> 00:48:36,646 Would it be able to work as a church? 909 00:48:36,706 --> 00:48:38,966 There's already a Calvary on Spring. 910 00:48:41,726 --> 00:48:45,526 Because one of the plans shows Calvary 911 00:48:45,626 --> 00:48:46,366 Church. 912 00:48:46,826 --> 00:48:50,606 Calvary Church is the property owner, but the use of that church is actually still 913 00:48:50,626 --> 00:48:54,166 being utilized as a residential structure, a single family structure. 914 00:48:55,226 --> 00:48:55,526 It is 915 00:48:57,326 --> 00:48:58,226 being used... 916 00:48:59,246 --> 00:49:03,126 It does not meet the definition of a treatment facility that would require 917 00:49:03,166 --> 00:49:07,146 any kind of approvals. I guess it is not part of 918 00:49:07,166 --> 00:49:07,276 this 919 00:49:08,246 --> 00:49:10,266 application, but where it came out, I can share. 920 00:49:10,306 --> 00:49:12,146 I did reach out and I did speak to the church. 921 00:49:12,606 --> 00:49:16,446 That specific church does run a 922 00:49:16,586 --> 00:49:20,506 faith-based program where they meet with 923 00:49:20,546 --> 00:49:22,766 people who are struggling with addiction. 924 00:49:23,306 --> 00:49:23,686 And 925 00:49:25,846 --> 00:49:29,066 they all live together and kind of learn the faith of that church. 926 00:49:29,546 --> 00:49:33,126 It, again, does not meet the therapeutic threshold to be a treatment 927 00:49:33,206 --> 00:49:36,826 facility because it is more this just faith-based 928 00:49:37,126 --> 00:49:38,166 residential living. 929 00:49:39,046 --> 00:49:39,726 But it is 930 00:49:40,746 --> 00:49:42,546 being used as a residential facility. 931 00:49:42,966 --> 00:49:44,626 So it doesn't need the medical component either? 932 00:49:44,966 --> 00:49:45,126 No. 933 00:49:45,326 --> 00:49:45,356 Okay. 934 00:49:45,386 --> 00:49:46,266 There's no medication 935 00:49:47,356 --> 00:49:49,356 Okay. I was just curious because I saw that and I- 936 00:49:49,416 --> 00:49:49,476 Yep 937 00:49:49,516 --> 00:49:52,476 ... I'm just trying to get my bearings there. 938 00:49:53,736 --> 00:49:56,176 So yeah, the buildings do look nice. 939 00:49:56,256 --> 00:50:00,236 It is unfortunate with a property this size that we cannot seem to 940 00:50:00,276 --> 00:50:03,756 utilize more single family. We're doing nothing to generate wealth or 941 00:50:03,776 --> 00:50:07,596 generational wealth. We're just a rental town, and that's 942 00:50:07,636 --> 00:50:08,366 what's unfortunate. 943 00:50:09,216 --> 00:50:12,006 But these do look more like homes and not- 944 00:50:14,026 --> 00:50:17,576 ... boxes. You didn't allude to any price point on a one-bedroom or two-bedroom. 945 00:50:17,636 --> 00:50:21,496 I know that's probably really far out to kind of dictate that, but market 946 00:50:21,536 --> 00:50:23,456 rent right now, ballpark? 947 00:50:25,716 --> 00:50:29,366 Yeah. Yeah. I'm honestly not sure where they're going to be at with the twos and 948 00:50:29,396 --> 00:50:29,736 the ones. 949 00:50:30,556 --> 00:50:34,436 When they're done, it'll be prevailing rates at that point. 950 00:50:34,676 --> 00:50:35,796 Right. Okay. Thank you. 951 00:50:37,436 --> 00:50:38,896 Thank you, Robin. Yes, Ariana. 952 00:50:40,316 --> 00:50:42,936 Justin, I'm saying this to you because we see you so often here. 953 00:50:43,436 --> 00:50:47,176 Respectfully, saying that a one-bedroom apartment is going to be cheaper than a 954 00:50:47,216 --> 00:50:50,056 two-bedroom apartment is not affordable housing. 955 00:50:50,336 --> 00:50:53,746 I hear what you're saying about offering a mix of different size units for people 956 00:50:53,776 --> 00:50:57,546 who have a lot of different needs. I completely appreciate that, but I 957 00:50:57,576 --> 00:51:01,566 expect that these one bedrooms will be at least $2,000 a month for rent, and that's 958 00:51:01,596 --> 00:51:03,716 simply not affordable. 959 00:51:04,676 --> 00:51:05,216 And that's okay. 960 00:51:06,476 --> 00:51:10,196 This doesn't have to be affordable housing because we need a mix of housing for 961 00:51:10,216 --> 00:51:13,936 people at all income levels, but I just want to say that for the board 962 00:51:13,976 --> 00:51:15,516 and for the future. 963 00:51:16,436 --> 00:51:19,576 And I just had a question. I really appreciate the thought that was put into the 964 00:51:19,616 --> 00:51:21,836 sidewalk project, and I think that's a great 965 00:51:23,236 --> 00:51:24,936 use of the public space requirement. 966 00:51:25,276 --> 00:51:29,236 But can you just elaborate on the conflicts that have come up when there is 967 00:51:29,256 --> 00:51:32,736 access to a trail that's within a subdivision? 968 00:51:33,116 --> 00:51:36,976 The only place that I'm familiar with this is on RE Drive, where there's two public 969 00:51:36,986 --> 00:51:40,656 parking spots for the trail up there, and I was just thinking, why not have two 970 00:51:40,676 --> 00:51:44,026 parking spots for this trail per the Parks Commission's recommendation, 971 00:51:44,096 --> 00:51:47,796 but would defer to the city's... If you could just elaborate on 972 00:51:48,056 --> 00:51:49,746 what the problems have been other than 973 00:51:50,596 --> 00:51:53,986 people who live there don't like seeing somebody they don't know walk through their 974 00:51:54,016 --> 00:51:55,236 driveway, which to me is like, 975 00:51:57,056 --> 00:51:58,216 I'm not too worried about that. 976 00:51:59,876 --> 00:52:01,376 Well, that is part of the problem- 977 00:52:02,636 --> 00:52:03,736 ... is that I think, 978 00:52:06,336 --> 00:52:09,916 to be fair, less so in a rental 979 00:52:09,976 --> 00:52:10,996 complex because it's being 980 00:52:12,016 --> 00:52:15,926 governed as one, and so it's a lot harder 981 00:52:15,936 --> 00:52:19,916 if somebody... Like if it were an L Maple, just for example, this did 982 00:52:19,956 --> 00:52:23,156 not occur there, but I'm just using it as an example, where a developer came in and 983 00:52:23,196 --> 00:52:26,076 they built the road and the individual lots, and then other folks came in and 984 00:52:26,136 --> 00:52:30,066 bought them. So the people who are living there didn't realize maybe that there 985 00:52:30,076 --> 00:52:33,086 was a public access easement on their property when they bought it, and then that 986 00:52:33,096 --> 00:52:35,336 can become a strong point of conflict. 987 00:52:35,376 --> 00:52:38,896 And then we get lots of calls about that, and then people get frustrated when we 988 00:52:38,956 --> 00:52:42,075 can't do anything, and so it ends up just being a conflict. 989 00:52:42,156 --> 00:52:42,635 Mm-hmm. 990 00:52:43,336 --> 00:52:46,426 In this one, the RE Drive is a good example, 991 00:52:47,516 --> 00:52:51,496 and I'll touch on this later, but it doesn't 992 00:52:51,536 --> 00:52:55,016 end up getting utilized that much because people don't know it's there. 993 00:52:55,976 --> 00:52:59,906 And then once people don't know it's there and it's not being utilized, 994 00:53:00,816 --> 00:53:04,736 the fact that it's there gets forgotten by everybody, and it does end up being 995 00:53:04,816 --> 00:53:07,516 something that is on everyone's mind at the moment of approval and then kind of 996 00:53:07,536 --> 00:53:08,376 falls off the table. 997 00:53:08,656 --> 00:53:08,856 Mm-hmm. 998 00:53:09,176 --> 00:53:13,165 So where there's a situation where if there were an existing trail along 999 00:53:13,176 --> 00:53:15,876 the back, I think that that would make sense to continue it, but where the entire 1000 00:53:15,916 --> 00:53:19,136 trail is and then the existence of entering the property, doing the loop, and going 1001 00:53:19,236 --> 00:53:20,316 out, that's where it didn't seem 1002 00:53:22,436 --> 00:53:23,916 like it made sense in this instance. 1003 00:53:24,296 --> 00:53:27,436 Okay. That makes sense to me, too, but thanks for explaining it for future 1004 00:53:27,476 --> 00:53:27,896 projects. 1005 00:53:27,976 --> 00:53:28,696 Mm-hmm. 1006 00:53:29,716 --> 00:53:30,056 Lucas. 1007 00:53:30,836 --> 00:53:34,796 I'm just curious, Dustin, do you know if the donated parcel, 1008 00:53:34,916 --> 00:53:38,796 the oversight of that, will be given to the same entity 1009 00:53:38,836 --> 00:53:42,696 that runs the sober living parcel abutting the 1010 00:53:42,716 --> 00:53:43,116 property? 1011 00:53:46,936 --> 00:53:48,966 So, the ownership of 1012 00:53:50,496 --> 00:53:54,016 the farmhouse? So the one that's already been conveyed off, are you talking about 1013 00:53:54,036 --> 00:53:55,946 the other two lots that are being created? Yeah. 1014 00:53:56,056 --> 00:53:59,776 You'd mentioned the part had been donated and just wondering if it's connected to 1015 00:53:59,816 --> 00:54:00,356 the abutter. 1016 00:54:01,776 --> 00:54:02,436 No. So, 1017 00:54:03,356 --> 00:54:05,946 the one that's already been conveyed, 1018 00:54:08,635 --> 00:54:12,306 the intent is not for either of these two lots that are being 1019 00:54:12,336 --> 00:54:16,276 created to also be managed by that same 1020 00:54:16,336 --> 00:54:16,636 owner. 1021 00:54:16,916 --> 00:54:17,416 Okay. 1022 00:54:18,056 --> 00:54:19,256 Yeah, there's no intent there. 1023 00:54:19,396 --> 00:54:19,406 Mm-hmm. 1024 00:54:20,616 --> 00:54:24,176 I think there'll be, again, a residential duplex constructed on one of the lots, 1025 00:54:24,736 --> 00:54:27,056 and then that existing barn building, 1026 00:54:28,616 --> 00:54:29,076 I think 1027 00:54:29,996 --> 00:54:33,776 in the beginning might just be used for storage during construction and everything. 1028 00:54:33,856 --> 00:54:37,816 They might keep some of their maintenance equipment in there and stuff like that. 1029 00:54:38,056 --> 00:54:41,936 Okay. Yeah, just clarifying because it sounded like the two components had been 1030 00:54:41,976 --> 00:54:44,616 conflated in the previous abutter comment. 1031 00:54:45,436 --> 00:54:45,816 Thank you. 1032 00:54:48,356 --> 00:54:48,856 Anybody else? 1033 00:54:51,556 --> 00:54:52,256 Jason. 1034 00:54:53,336 --> 00:54:53,936 Thank you, Mr. Chair. 1035 00:54:57,036 --> 00:55:00,776 Just curious about if there's been traffic counts done out there for 1036 00:55:00,796 --> 00:55:01,496 Saco Street? 1037 00:55:03,616 --> 00:55:07,376 So we didn't do site-specific traffic counts to generate 1038 00:55:07,476 --> 00:55:10,236 what the background traffic is going down Saco. 1039 00:55:10,676 --> 00:55:14,516 We did trip generation calculations just for this project, 1040 00:55:15,516 --> 00:55:18,186 but didn't necessarily 1041 00:55:18,456 --> 00:55:21,116 analyze the whole corridor. 1042 00:55:21,176 --> 00:55:21,376 Okay. 1043 00:55:22,676 --> 00:55:23,025 With the 1044 00:55:24,316 --> 00:55:26,776 amount of units, does it require a traffic study? 1045 00:55:27,636 --> 00:55:27,716 No? 1046 00:55:28,056 --> 00:55:29,216 Not that I'm aware of, no. 1047 00:55:30,416 --> 00:55:30,556 No. 1048 00:55:31,856 --> 00:55:32,936 All right. Okay. 1049 00:55:33,836 --> 00:55:34,276 Design. 1050 00:55:35,076 --> 00:55:37,836 I really like the design. I think it looks really nice. 1051 00:55:38,936 --> 00:55:42,896 But I agree, the mechanical shed 1052 00:55:42,996 --> 00:55:46,976 should not be the front. That's the first thing you see. 1053 00:55:48,936 --> 00:55:49,576 Looking at this 1054 00:55:50,436 --> 00:55:54,036 and those pictures there, if you rotated building A 180 1055 00:55:54,076 --> 00:55:57,936 degrees, put the shed in the back, and then building B rotated it 90 degrees 1056 00:55:58,276 --> 00:56:01,024 clockwise, it would look like Kind of like that up there. 1057 00:56:01,064 --> 00:56:03,644 It'll look like two different buildings, but it's the same building. 1058 00:56:04,424 --> 00:56:06,543 And, it would hide the sheds. 1059 00:56:07,724 --> 00:56:07,884 But, 1060 00:56:09,024 --> 00:56:10,004 nice design. 1061 00:56:11,804 --> 00:56:12,444 Parking lot. 1062 00:56:13,574 --> 00:56:14,504 That is a lot of asphalt. 1063 00:56:17,204 --> 00:56:20,904 I mean, 1064 00:56:21,724 --> 00:56:24,084 it is what it is. But 1065 00:56:25,224 --> 00:56:28,464 if there's any chance to soften this up a bit, 1066 00:56:30,864 --> 00:56:31,424 that would be 1067 00:56:32,424 --> 00:56:34,044 definitely beneficial. 1068 00:56:35,004 --> 00:56:36,344 Because that is a big parking lot 1069 00:56:37,344 --> 00:56:38,284 coming into the entrance. 1070 00:56:40,244 --> 00:56:41,464 One of the things we did is 1071 00:56:42,524 --> 00:56:45,484 we narrowed up the driveway entrance coming in. 1072 00:56:45,544 --> 00:56:49,464 One of the things, by moving the development further back into the lot and 1073 00:56:49,504 --> 00:56:53,414 not having parking up in that first few hundred feet, we're 1074 00:56:53,444 --> 00:56:54,904 able to go with a narrower- 1075 00:56:55,204 --> 00:56:55,294 Mm-hmm 1076 00:56:55,784 --> 00:56:59,404 ... driveway section up until the point where we have to do 90-degree 1077 00:56:59,504 --> 00:57:02,724 parking. At that point, we need to provide enough space so you're not backing into 1078 00:57:02,764 --> 00:57:06,624 vehicles and causing damage. So we tried to keep it neck 1079 00:57:06,644 --> 00:57:10,404 down for as long as we could, and then eventually we kind of got to the spots where 1080 00:57:10,444 --> 00:57:13,344 we had to have parking, so then we had to widen it up at that point. 1081 00:57:20,244 --> 00:57:23,964 Yeah. Is there any discussion about putting a fence between the 1082 00:57:24,004 --> 00:57:25,524 farmhouse and 1083 00:57:27,724 --> 00:57:28,364 Building A? 1084 00:57:29,724 --> 00:57:31,004 I assume that's the farmhouse, the 1085 00:57:33,444 --> 00:57:34,044 kind of like the S- 1086 00:57:34,284 --> 00:57:34,294 Yeah 1087 00:57:34,294 --> 00:57:35,764 ... kind of like that L-shaped one there. 1088 00:57:36,664 --> 00:57:40,064 Yeah. In that case there, 1089 00:57:42,224 --> 00:57:45,864 that's already a big building. It's probably as 1090 00:57:45,904 --> 00:57:49,724 tall as these new buildings that are going 1091 00:57:49,804 --> 00:57:50,004 in. 1092 00:57:51,144 --> 00:57:54,944 So it didn't look like something where something on the ground per 1093 00:57:55,044 --> 00:57:55,744 se would 1094 00:57:56,864 --> 00:58:00,564 do much for the buildings, because of kind of how close they are and 1095 00:58:00,884 --> 00:58:03,124 the fact that all of the buildings are pretty large. 1096 00:58:03,804 --> 00:58:07,784 So we looked at, basically, we also 1097 00:58:07,824 --> 00:58:09,644 have some drainage that runs in between, 1098 00:58:10,864 --> 00:58:13,784 kind of around the backside of the farmhouse heading towards the garage. 1099 00:58:13,824 --> 00:58:15,464 It kind of breaks in two directions there. 1100 00:58:17,204 --> 00:58:20,604 So there's a few things going on there where just trying to create a physical 1101 00:58:20,704 --> 00:58:23,304 barrier there didn't make a lot of sense to us. 1102 00:58:23,664 --> 00:58:27,584 Certainly going forward, if the church feels like a fence 1103 00:58:27,604 --> 00:58:29,604 is required, we kind of have a strip in between- 1104 00:58:29,664 --> 00:58:29,694 Mm-hmm 1105 00:58:30,244 --> 00:58:34,104 ... the church property and the retained land, this 1106 00:58:34,184 --> 00:58:35,744 Lot 3, where that 1107 00:58:36,704 --> 00:58:40,024 single-family house lot kind of, it's like an L shape there. 1108 00:58:42,544 --> 00:58:45,404 So I think doing a fence along that line too, we'd have to kind of figure out kind 1109 00:58:45,444 --> 00:58:48,864 of where it would go. But certainly opportunity to do one, but at this point- 1110 00:58:50,184 --> 00:58:50,344 Okay 1111 00:58:50,824 --> 00:58:52,004 ... I don't know that it's needed. 1112 00:58:52,284 --> 00:58:53,104 Right. Yeah, and it 1113 00:58:54,184 --> 00:58:54,504 sounds like 1114 00:58:55,684 --> 00:58:58,004 it was owned by the developer. 1115 00:58:58,284 --> 00:58:58,564 Yes. 1116 00:58:58,624 --> 00:58:58,944 Yeah, so. 1117 00:58:59,024 --> 00:58:59,304 Correct. 1118 00:59:00,124 --> 00:59:01,424 Kind of up to them. So. 1119 00:59:01,764 --> 00:59:01,844 Yeah. 1120 00:59:01,884 --> 00:59:02,444 All right. Well, thanks. 1121 00:59:04,724 --> 00:59:05,984 Thank you, Jason. Anybody else? 1122 00:59:07,504 --> 00:59:08,204 Go ahead, Rebecca. 1123 00:59:08,624 --> 00:59:11,344 If the board's all finished with their comments, I don't mind if I could say 1124 00:59:11,384 --> 00:59:11,824 something quickly. 1125 00:59:11,844 --> 00:59:12,184 Yeah, go ahead. 1126 00:59:12,444 --> 00:59:16,324 Yep. I just wanted to speak to Kathy for a minute 1127 00:59:16,364 --> 00:59:18,144 and acknowledge the 1128 00:59:19,944 --> 00:59:23,124 concern you're feeling about the feeling of the multifamily next to the single 1129 00:59:23,204 --> 00:59:27,084 family, and that that can feel very jarring when it hasn't been 1130 00:59:27,124 --> 00:59:28,344 built yet. And it will be different. 1131 00:59:28,424 --> 00:59:30,984 We cannot deny that having development next will be... 1132 00:59:31,224 --> 00:59:34,864 Some of the previous iterations of this did include more duplex style, 1133 00:59:35,204 --> 00:59:37,864 but the trade-off to that was then it went all the way to the back, and so you were 1134 00:59:37,904 --> 00:59:39,164 clearing all the way in the back. 1135 00:59:40,184 --> 00:59:44,104 So there's the benefits of this kind of being clustered 1136 00:59:44,164 --> 00:59:47,844 up front, maintaining the back as a vegetated wild area versus 1137 00:59:47,944 --> 00:59:50,983 clearing in the back and losing that habitat. 1138 00:59:51,964 --> 00:59:55,644 There's also topographical challenges in this particular parcel that lent 1139 00:59:55,964 --> 00:59:57,784 its way to this development. 1140 00:59:58,684 --> 01:00:00,444 But I wanted to 1141 01:00:01,504 --> 01:00:05,004 let you know that the board, I was going to remind the board of this later, so I'm 1142 01:00:05,284 --> 01:00:07,364 just going to remind you now. But the board's going to be holding a 1143 01:00:07,404 --> 01:00:10,924 post-construction site walk, specifically to take a look at a couple 1144 01:00:10,944 --> 01:00:14,344 developments that show the integration of multifamily and single-family 1145 01:00:14,424 --> 01:00:18,374 homes. Because one thing that I think a lot of people don't realize is that 1146 01:00:18,384 --> 01:00:21,734 we are very much a mixed housing type 1147 01:00:22,364 --> 01:00:26,144 city, really. We have a mix of single family, duplexes, triplexes, 1148 01:00:26,224 --> 01:00:30,144 multis, all over the place. And I think a lot of times people don't see 1149 01:00:30,164 --> 01:00:33,624 them because once they're built, they really nestle in and they just settle out. 1150 01:00:34,884 --> 01:00:38,704 One of the sites we're going to be visiting actually is the same developer 1151 01:00:39,084 --> 01:00:42,864 and has a similar building style that might, if you are 1152 01:00:42,904 --> 01:00:44,984 interested, you may enjoy coming and seeing. 1153 01:00:45,864 --> 01:00:49,064 If you are interested in that, please reach out to the planning department and we 1154 01:00:49,104 --> 01:00:52,424 can let you know the information of that, what time, where to 1155 01:00:52,524 --> 01:00:56,394 meet. We're going to be visiting three different sites and just meeting at 1156 01:00:56,424 --> 01:00:59,524 one and kind of going on to the next one whenever we're finished at the one. 1157 01:00:59,954 --> 01:01:02,484 But it could be an opportunity for you to just sort of see that 1158 01:01:03,524 --> 01:01:05,324 integration once it's constructed. 1159 01:01:07,384 --> 01:01:08,204 Do you want to say anything? 1160 01:01:09,244 --> 01:01:09,504 No. 1161 01:01:11,824 --> 01:01:12,744 Yes. Come on up. 1162 01:01:13,704 --> 01:01:14,084 For me? 1163 01:01:14,244 --> 01:01:14,754 You have to come to the microphone. 1164 01:01:14,764 --> 01:01:15,964 You have to come on up to the microphone. 1165 01:01:16,444 --> 01:01:16,653 Oh, sorry. 1166 01:01:16,653 --> 01:01:18,723 Sorry. They can't hear you on record. 1167 01:01:20,664 --> 01:01:22,904 I think my main concern is more with the numbers. 1168 01:01:23,244 --> 01:01:24,064 The numbers of 1169 01:01:25,264 --> 01:01:29,124 units, and the number of cars that are going to be there, and 1170 01:01:29,204 --> 01:01:32,724 the access, and the diagram. I mean, I am not 1171 01:01:32,764 --> 01:01:35,514 100% single family homes, if there were 1172 01:01:35,544 --> 01:01:39,004 duplexes or something like that. It's just the sheer 1173 01:01:39,064 --> 01:01:42,284 numbers of what is going to be in there. 1174 01:01:43,564 --> 01:01:47,044 And, well, 172, but we've also seen something that 1175 01:01:47,744 --> 01:01:50,484 referred to 184 units going in there. 1176 01:01:51,444 --> 01:01:54,164 And I've seen that on some paperwork. 1177 01:01:55,004 --> 01:01:56,644 Thank you for saying that again. I had that down. 1178 01:01:56,744 --> 01:01:59,804 It's not 184, it's 84. So 1179 01:02:00,024 --> 01:02:04,004 there's seven 12 unit buildings, so the 1180 01:02:04,044 --> 01:02:06,164 full build out, the full master plan is 84. 1181 01:02:06,204 --> 01:02:07,264 Yeah, 84. I'm sorry. Yeah. 1182 01:02:07,284 --> 01:02:07,954 No, that's okay. I just wanted to- 1183 01:02:07,954 --> 01:02:08,164 I'm sorry. 1184 01:02:08,544 --> 01:02:08,554 Yep. 1185 01:02:08,564 --> 01:02:09,884 But it's just the sheer numbers of 1186 01:02:11,220 --> 01:02:15,080 People and vehicles, and where are you gonna 1187 01:02:15,120 --> 01:02:17,680 park all the vehicles? People are gonna live there. 1188 01:02:17,720 --> 01:02:19,900 A lot of people are gonna live there. There are gonna be people in and out. 1189 01:02:20,120 --> 01:02:22,700 They're gonna have company. You're gonna have deliveries. 1190 01:02:23,440 --> 01:02:26,980 And I don't think any of us really 1191 01:02:27,060 --> 01:02:30,220 expected that it was gonna be all single-family homes. 1192 01:02:30,230 --> 01:02:33,360 It just wasn't realistic at this point in 1193 01:02:33,420 --> 01:02:34,940 time. So- 1194 01:02:35,000 --> 01:02:38,770 We have parking ordinances, so each 1195 01:02:38,780 --> 01:02:42,310 building that has to be maintained in the city, no matter what it is, 1196 01:02:42,920 --> 01:02:46,580 whether it's a house, whether it's an apartment, whether it's a duplex, has to 1197 01:02:46,640 --> 01:02:50,280 have the standard amount of parking spots per 1198 01:02:50,360 --> 01:02:53,680 unit. So any time there's a unit being built, whether it's a 1199 01:02:53,700 --> 01:02:57,580 multifamily, they have to abide by the city code of 1200 01:02:57,640 --> 01:03:01,320 ordinances, the amount of parking to be able to 1201 01:03:01,400 --> 01:03:04,180 handle the amount of units that are gonna be developed. 1202 01:03:04,240 --> 01:03:07,880 So you're not gonna have any overflow on Saco Street as far as that goes. 1203 01:03:07,930 --> 01:03:07,930 Okay. 1204 01:03:07,960 --> 01:03:11,720 If there needs to be more parking, if 1205 01:03:12,000 --> 01:03:12,950 the development gets bigger, 1206 01:03:14,060 --> 01:03:17,800 normally we can add additional parking for visitors. 1207 01:03:17,930 --> 01:03:19,760 And usually, the developer will do that. 1208 01:03:20,180 --> 01:03:22,800 So we're not gonna have any parking on Saco Street per se. 1209 01:03:23,980 --> 01:03:27,140 There's gonna be plenty of room for the residents to park within their- 1210 01:03:27,210 --> 01:03:27,210 Okay 1211 01:03:27,210 --> 01:03:28,360 ... complex without any... 1212 01:03:29,180 --> 01:03:33,150 This parking lot's pretty big as it is, what we see on both sides. 1213 01:03:33,660 --> 01:03:37,160 So there's definitely enough. It's 1.75 parking spots 1214 01:03:37,200 --> 01:03:41,160 per unit, and that's plenty sufficient, what we've seen 1215 01:03:41,220 --> 01:03:43,900 for any other application in the city. So. 1216 01:03:44,160 --> 01:03:48,040 And then the other, of course, the main concern was traffic in and out, which 1217 01:03:48,340 --> 01:03:52,100 now that you've got a new road coming in off the 1218 01:03:52,160 --> 01:03:56,080 back end of Idex. We have another driveway coming in 1219 01:03:56,160 --> 01:03:57,820 across the street from that. It just 1220 01:03:58,840 --> 01:03:59,860 gets crazy. So. 1221 01:03:59,920 --> 01:04:00,360 Mm-hmm. 1222 01:04:00,580 --> 01:04:00,590 Thank you. 1223 01:04:00,620 --> 01:04:02,380 I understand your concern. Thank you. 1224 01:04:05,580 --> 01:04:06,560 With that, we do have a- 1225 01:04:07,020 --> 01:04:07,030 Mr. Chair? 1226 01:04:07,030 --> 01:04:07,820 Go ahead, John. 1227 01:04:08,360 --> 01:04:11,030 Just because it's come up again, through you to the planner, 1228 01:04:14,180 --> 01:04:17,560 Saco Street's a state road, and we can't control that. Is that how that works? 1229 01:04:18,450 --> 01:04:21,380 When it comes to speed limits, that's a state issue? 1230 01:04:22,340 --> 01:04:24,980 It is a state-designated speed limit, yes. 1231 01:04:25,360 --> 01:04:26,440 All right. And 1232 01:04:28,240 --> 01:04:30,540 is that ever affected by the amount of 1233 01:04:32,660 --> 01:04:35,420 maybe curb cuts or cars entering it? 1234 01:04:35,640 --> 01:04:39,420 For example, the creation of 24 units doesn't require a traffic study, but 1235 01:04:39,440 --> 01:04:43,260 that's theoretically. Twenty-four more entries and exits onto a road, 1236 01:04:43,700 --> 01:04:46,880 does that ever factor into speed limit designations as far as you 1237 01:04:46,940 --> 01:04:47,800 know? 1238 01:04:47,900 --> 01:04:51,800 It does not. Speed limit factors into the location 1239 01:04:51,840 --> 01:04:55,120 of curb cuts and entrances in order to determine that there's an adequate sight 1240 01:04:55,180 --> 01:04:55,680 distance- 1241 01:04:55,829 --> 01:04:55,829 Sight distance 1242 01:04:55,829 --> 01:04:59,460 ... in that speed, right. But the entrance itself wouldn't affect the speed of the 1243 01:04:59,500 --> 01:04:59,720 road. 1244 01:04:59,960 --> 01:05:00,620 Okay. Thank you. 1245 01:05:02,700 --> 01:05:03,620 Good question, John. 1246 01:05:05,440 --> 01:05:09,320 With that, I have a motion on page 10 of our memo. 1247 01:05:15,260 --> 01:05:16,250 Anybody entertain? John? 1248 01:05:16,440 --> 01:05:20,180 Mr. Chair, I move that the planning board approve the site plan 1249 01:05:20,280 --> 01:05:23,960 subdivision application for MTR Development LLC 1250 01:05:24,540 --> 01:05:28,400 to subdivide parcel previously addressed as 547 Saco 1251 01:05:28,460 --> 01:05:32,380 Street into three separate lots, and the construction of an 800-foot driveway 1252 01:05:32,400 --> 01:05:36,300 to provide access to the development of two 12-unit multifamily 1253 01:05:36,360 --> 01:05:40,300 buildings on Lot 3, Tax Map 4, Lot 13, Zoned 1254 01:05:40,360 --> 01:05:44,200 Residential Growth Area 2. Approval includes the following findings of fact, 1255 01:05:44,240 --> 01:05:47,889 conclusions, and conditions as stated on pages 10 through 15 of the 1256 01:05:48,280 --> 01:05:52,040 staff memo dated July 31st, 2026, which are adopted in 1257 01:05:52,120 --> 01:05:53,000 support of this approval. 1258 01:05:53,680 --> 01:05:55,500 Thank you. Can I have a second, please? 1259 01:05:56,380 --> 01:05:56,660 Second. 1260 01:05:58,300 --> 01:05:59,140 Thank you, Robin. 1261 01:05:59,940 --> 01:06:01,160 Can I have a roll call vote, please? 1262 01:06:05,920 --> 01:06:07,400 Robin Tannenbaum? Yes. 1263 01:06:08,840 --> 01:06:09,780 Nancy Litercapes? 1264 01:06:10,500 --> 01:06:10,800 Yes. 1265 01:06:12,380 --> 01:06:13,000 Jason Frazier? 1266 01:06:13,520 --> 01:06:13,700 Yes. 1267 01:06:14,680 --> 01:06:16,160 Karen Axelson? Yes. 1268 01:06:17,140 --> 01:06:17,820 Kevin Price? 1269 01:06:18,140 --> 01:06:18,360 Yes. 1270 01:06:19,520 --> 01:06:20,200 Lucas Shrake? 1271 01:06:20,420 --> 01:06:20,600 Yes. 1272 01:06:21,560 --> 01:06:22,260 Oriana Farnham? 1273 01:06:22,560 --> 01:06:22,800 Yes. 1274 01:06:24,160 --> 01:06:24,840 John Turcotte? 1275 01:06:25,400 --> 01:06:25,580 Yes. 1276 01:06:26,500 --> 01:06:27,440 And Larry McWilliams. 1277 01:06:27,860 --> 01:06:31,740 Yes. Seeing unanimous. Thank you, Dustin, for that presentation. 1278 01:06:32,060 --> 01:06:32,360 Thank you. 1279 01:06:33,800 --> 01:06:36,660 I also need now a motion to go into workshop, please. 1280 01:06:38,060 --> 01:06:39,060 So moved, Mr. Chair. 1281 01:06:39,440 --> 01:06:40,200 Thank you, Nancy. 1282 01:06:40,440 --> 01:06:40,680 Second. 1283 01:06:41,120 --> 01:06:44,380 Thanks, Kevin. Can I get another roll call vote, Jenna, please? 1284 01:06:48,900 --> 01:06:52,220 Robin Tannenbaum? Yes. Nancy Litercapes? 1285 01:06:53,240 --> 01:06:53,480 Yes. 1286 01:06:54,020 --> 01:06:54,680 Jason Frazier? 1287 01:06:55,260 --> 01:06:55,460 Yes. 1288 01:06:56,020 --> 01:06:58,640 Karen Axelson? Yes. Kevin Price? 1289 01:06:58,740 --> 01:06:58,920 Yes. 1290 01:06:59,580 --> 01:07:00,300 Lucas Shrake? 1291 01:07:00,340 --> 01:07:00,540 Yes. 1292 01:07:01,000 --> 01:07:01,740 Oriana Farnham? 1293 01:07:01,960 --> 01:07:02,180 Yes. 1294 01:07:03,100 --> 01:07:03,740 John Turcotte? 1295 01:07:04,020 --> 01:07:04,220 Yes. 1296 01:07:04,580 --> 01:07:05,500 And Larry McWilliams. 1297 01:07:05,920 --> 01:07:09,700 Yes. Thank you. With that, Orlando, can you read the next 1298 01:07:09,780 --> 01:07:10,800 item into the record, please? 1299 01:07:12,200 --> 01:07:16,180 Item number 26-000635, Site 1300 01:07:16,300 --> 01:07:19,400 Plan 100 Larabee Road, 100 Larabee LLC. 1301 01:07:19,960 --> 01:07:23,540 The applicant is requesting an expansion to provide 34 additional parking 1302 01:07:23,600 --> 01:07:27,160 spaces to the Larabee complex. Tax Map 042B, 1303 01:07:27,560 --> 01:07:31,500 Lot 006, Zone Gateway Commercial, Use Retail, 1304 01:07:31,620 --> 01:07:32,780 Restaurant Class 2. 1305 01:07:34,340 --> 01:07:36,960 Thank you. With that, applicant presentation, please. 1306 01:07:38,480 --> 01:07:39,380 Good evening, members of the board. 1307 01:07:39,420 --> 01:07:43,010 My name's Henry Hess, Spiga Technics, representing the applicant tonight at 1308 01:07:43,400 --> 01:07:47,090 Larabee Road. And I'm just gonna pull up my presentation 1309 01:07:47,140 --> 01:07:47,760 here. 1310 01:07:58,680 --> 01:08:02,320 So before the board, as stated, is a parking 1311 01:08:02,360 --> 01:08:03,840 expansion at 100 Larabee Road, 1312 01:08:04,800 --> 01:08:07,580 proposed parking expansion. To orient you briefly, 1313 01:08:09,300 --> 01:08:12,460 the site centered in the picture here, Larabee Road 1314 01:08:13,180 --> 01:08:13,580 running 1315 01:08:14,400 --> 01:08:16,960 to the south of the site here, or Page South, 1316 01:08:17,920 --> 01:08:20,820 Main Street to the right side, and Terminal Street 1317 01:08:21,960 --> 01:08:22,800 to the left 1318 01:08:23,692 --> 01:08:25,362 It's a large building 1319 01:08:26,753 --> 01:08:30,392 with a separate building as well adjacent to it, multi-tenant 1320 01:08:30,432 --> 01:08:32,333 commercial style building. 1321 01:08:34,413 --> 01:08:36,293 If I go to the next page here. 1322 01:08:43,852 --> 01:08:44,373 There we go. 1323 01:08:48,253 --> 01:08:49,272 Here it goes. 1324 01:08:51,572 --> 01:08:52,132 Too far. 1325 01:08:53,572 --> 01:08:54,262 Exists today. 1326 01:08:55,333 --> 01:08:58,892 Like I said, just briefly wanted to show existing conditions that were out there, 1327 01:09:00,333 --> 01:09:00,952 and then 1328 01:09:02,293 --> 01:09:05,272 if we could just get this to... 1329 01:09:06,272 --> 01:09:10,012 What's being proposed is approximately 33 parking 1330 01:09:10,032 --> 01:09:10,562 spaces 1331 01:09:11,833 --> 01:09:15,632 expanded at this site. There's currently 1332 01:09:15,772 --> 01:09:16,552 333. 1333 01:09:19,333 --> 01:09:21,333 The shift itself, 1334 01:09:22,352 --> 01:09:26,272 or the addition itself is majority in that western corner of the 1335 01:09:26,312 --> 01:09:27,713 parcel along Terminal Street. 1336 01:09:29,452 --> 01:09:33,392 In order to find that additional parking, a lot of it entails shifting 1337 01:09:33,413 --> 01:09:35,492 that driveway entrance to the west. 1338 01:09:36,672 --> 01:09:37,512 That provides 1339 01:09:38,373 --> 01:09:41,592 adequate space for a long row of parking, and then 1340 01:09:41,612 --> 01:09:45,052 expanding the interior parking and providing 1341 01:09:45,532 --> 01:09:47,272 parking islands in the center as well. 1342 01:09:49,352 --> 01:09:53,312 There are a number of spots dotted 1343 01:09:53,322 --> 01:09:55,812 throughout the site beyond that, about five 1344 01:09:56,852 --> 01:10:00,072 on the left side of Larabee Road, one on the right 1345 01:10:01,572 --> 01:10:02,452 side of Larabee Road, 1346 01:10:03,892 --> 01:10:07,832 and then a few to the rear back right where we 1347 01:10:07,912 --> 01:10:11,772 have proposed some one-way directional access. 1348 01:10:12,472 --> 01:10:15,532 A lot of the parking, the reason that one-way directional access is proposed, a lot 1349 01:10:15,552 --> 01:10:18,672 of the parking that comes through there and the access is one-way parking. 1350 01:10:20,452 --> 01:10:24,112 And right now, the way a lot of the tenants use the 1351 01:10:24,292 --> 01:10:28,092 site, a lot of drop-off happens to the rear 1352 01:10:28,192 --> 01:10:30,852 for some of the tenants at specific times, 1353 01:10:31,732 --> 01:10:35,392 and that circulation just helps keep some of the cars a little bit more organized 1354 01:10:35,452 --> 01:10:39,172 in there as opposed to a lot of crisscross traffic as people drop off, either 1355 01:10:40,612 --> 01:10:44,452 people attending either events to the rear or going into 1356 01:10:44,532 --> 01:10:46,532 the uses into the rear as well. 1357 01:10:47,992 --> 01:10:51,772 So the site itself is proposing minimal expansion 1358 01:10:51,892 --> 01:10:55,612 of impervious, albeit there is an expansion of about 6,000 square 1359 01:10:55,752 --> 01:10:56,012 feet 1360 01:10:56,812 --> 01:11:00,512 for these parking spaces. As such, 1361 01:11:00,892 --> 01:11:04,512 the project's proposing in two locations there, close to Terminal 1362 01:11:04,632 --> 01:11:04,892 Street, 1363 01:11:06,372 --> 01:11:08,012 one on the west, one on the east side there. 1364 01:11:08,472 --> 01:11:10,492 Two smaller detention or 1365 01:11:12,512 --> 01:11:16,492 stormwater basins there to detain and meet the flooding standards of the city. 1366 01:11:18,532 --> 01:11:20,392 A lot of the site water today 1367 01:11:22,352 --> 01:11:26,192 either runs into existing storm drainage and into a 1368 01:11:26,332 --> 01:11:30,232 swell around Terminal Street and actually flows to another area 1369 01:11:30,272 --> 01:11:34,192 of treatment offsite, or as well as there's an existing filterra 1370 01:11:34,232 --> 01:11:38,052 system along Terminal Street that does currently treat a 1371 01:11:38,092 --> 01:11:39,172 section of that pavement as well 1372 01:11:40,012 --> 01:11:43,412 before outletting again to that swale that runs along Terminal Street. 1373 01:11:47,992 --> 01:11:51,032 The reason this parking expansion is proposed is 1374 01:11:51,752 --> 01:11:53,252 the owner of the lot has had 1375 01:11:54,612 --> 01:11:58,592 a number of new leases with new tenants that require additional parking. 1376 01:11:58,632 --> 01:11:59,672 They've seen a lot of 1377 01:12:01,492 --> 01:12:05,352 well, full parking lots for their tenants recently and they're trying to, 1378 01:12:05,712 --> 01:12:09,612 with increased programming that those tenants have, go into the evening and 1379 01:12:09,652 --> 01:12:13,512 nighttime demands. There's kind of a new overlap in the 1380 01:12:13,792 --> 01:12:17,552 parking that's been happening there, and they're seeing a lot of congestion and 1381 01:12:17,572 --> 01:12:20,932 tenants that really need some additional parking there to suit their needs. 1382 01:12:23,192 --> 01:12:25,912 So that's why we're here before you at this workshop. 1383 01:12:26,952 --> 01:12:30,312 Part of this proposal and the expansion of impervious area 1384 01:12:31,352 --> 01:12:35,332 does mean that there's a slight reduction in the percentage of the total 1385 01:12:35,372 --> 01:12:37,372 or overall landscape area for the site. 1386 01:12:37,592 --> 01:12:40,991 I know the Gateway District, there's a 25% requirement. 1387 01:12:41,972 --> 01:12:45,452 Existing today, this site has 14%. 1388 01:12:45,672 --> 01:12:49,242 It's a larger commercial site with 1389 01:12:49,312 --> 01:12:53,252 a fair amount of paving. With the expansion, it'd be down 1390 01:12:53,272 --> 01:12:54,032 to 12%. 1391 01:12:55,212 --> 01:12:57,292 So again, a slight reduction there. 1392 01:12:57,332 --> 01:13:00,982 There will be a few trees impacted as such, about four or five trees 1393 01:13:01,032 --> 01:13:04,972 impacted for the expansion, and as part of the site plan that comes forward, 1394 01:13:05,032 --> 01:13:08,552 you'd see those trees replaced and some additional landscaping there 1395 01:13:08,932 --> 01:13:10,852 where feasible and to provide some buffering. 1396 01:13:12,152 --> 01:13:15,992 So I guess with that, I can turn my time back over to the 1397 01:13:16,012 --> 01:13:17,852 board and answer any questions you may have. 1398 01:13:18,832 --> 01:13:22,352 Certainly, I know Rebecca might have a little information as well, 1399 01:13:22,432 --> 01:13:24,352 but I'm here for the board for any questions. 1400 01:13:26,252 --> 01:13:26,932 Thank you very much. 1401 01:13:28,752 --> 01:13:29,132 Rebecca? 1402 01:13:30,352 --> 01:13:34,022 Yeah, so as Henry stated, there is a reduction in 1403 01:13:34,022 --> 01:13:37,972 the landscape on this site. Typically, that's not something that would be allowed. 1404 01:13:38,052 --> 01:13:40,812 It's already non-conforming. You're not typically allowed to increase the 1405 01:13:40,832 --> 01:13:44,272 non-conformity. However, in the Gateway Commercial District, it expressly states 1406 01:13:44,312 --> 01:13:47,772 that this can be something that the board approves if it's found that there's no 1407 01:13:47,832 --> 01:13:51,392 other reasonable alternative. There is a fee in lieu that would be 1408 01:13:51,452 --> 01:13:55,392 associated with that. We use the same calculation as we do for our open space 1409 01:13:55,432 --> 01:13:58,392 in determining that, and that funds 1410 01:13:59,892 --> 01:14:02,652 are then required to be utilized within the Main Street 1411 01:14:03,112 --> 01:14:06,312 corridor for safety or beautification improvements. 1412 01:14:07,212 --> 01:14:09,912 So Henry has been made aware of this. 1413 01:14:09,952 --> 01:14:12,812 We need to get the finalized number, but just running off of those basic 1414 01:14:12,872 --> 01:14:16,792 percentages, it's about a reduction of 6,000 square feet, which would be a fee 1415 01:14:16,812 --> 01:14:19,912 in lieu of about $13,071. 1416 01:14:22,000 --> 01:14:25,920 And the only other staff comment here is that we kind of spoke 1417 01:14:25,960 --> 01:14:29,720 to it briefly in the memo, but we'll need to continue to work with the applicant in 1418 01:14:29,760 --> 01:14:33,560 identifying how that one-way maneuver is going to 1419 01:14:33,600 --> 01:14:37,060 function. It looks functional on paper. 1420 01:14:37,120 --> 01:14:41,100 However, in reality, that's pavement on the other side, so 1421 01:14:41,120 --> 01:14:44,240 it's going pavement to pavement. There's no delineation of that one way, so there's 1422 01:14:44,260 --> 01:14:46,560 nothing that's really forcing a vehicle to follow that. 1423 01:14:47,060 --> 01:14:51,020 So, we may need to explore options of seeing, does this need to be in one way, 1424 01:14:51,120 --> 01:14:55,040 or if it does, is there a way to delineate it or provide something in addition to 1425 01:14:55,080 --> 01:14:58,520 pavement markings to encourage compliance. 1426 01:15:03,300 --> 01:15:03,880 That's all. 1427 01:15:03,940 --> 01:15:04,680 Okay. Thank you. 1428 01:15:06,560 --> 01:15:07,369 Any board comments? 1429 01:15:09,060 --> 01:15:12,260 Through you to the planner. I've never seen this before where the staff memo 1430 01:15:12,300 --> 01:15:15,720 indicates that some of the proposed parking are not approved. 1431 01:15:16,320 --> 01:15:20,180 So what happens if we approve... I realize we're not up to that, but if 1432 01:15:20,420 --> 01:15:23,560 it gets to the point of approval and we approve something that the fire marshal 1433 01:15:23,580 --> 01:15:27,380 doesn't allow, except for that part, it would continue 1434 01:15:27,420 --> 01:15:27,680 forward? 1435 01:15:27,960 --> 01:15:31,840 Well, the staff memo are recommendations, really, to the board, but it is letting 1436 01:15:31,880 --> 01:15:34,880 you know that FD does not support it, and we do generally 1437 01:15:35,720 --> 01:15:38,420 follow FD's guidance for safety measures. 1438 01:15:38,680 --> 01:15:41,160 There was a concern of access at that particular location. 1439 01:15:41,240 --> 01:15:41,279 Right. 1440 01:15:41,320 --> 01:15:41,650 So it would be- 1441 01:15:41,650 --> 01:15:42,600 It's right there in front of the entrance. 1442 01:15:42,680 --> 01:15:46,350 Yep, it would be FD's recommendation to not have those located 1443 01:15:46,350 --> 01:15:46,740 there. 1444 01:15:46,780 --> 01:15:48,470 You know what? I appreciate that comment, too. 1445 01:15:48,510 --> 01:15:52,440 It's something I didn't get a chance to, I overlooked mentioning in a 1446 01:15:52,520 --> 01:15:55,980 quick presentation there. It's something that we've spoken to the applicant. 1447 01:15:56,000 --> 01:15:59,190 That's understandable. We've heard that comment from the fire department loud and 1448 01:15:59,240 --> 01:15:59,460 clear. 1449 01:15:59,600 --> 01:15:59,660 Okay. 1450 01:15:59,700 --> 01:16:03,280 So, any formal site plan that came forward at that point would 1451 01:16:03,780 --> 01:16:06,980 be following the fire marshal or fire recommendations. 1452 01:16:07,020 --> 01:16:08,280 Thank you. 1453 01:16:10,860 --> 01:16:11,240 Mr. Chair? 1454 01:16:11,680 --> 01:16:11,960 Yes, Kevin. 1455 01:16:12,160 --> 01:16:16,020 Just a quick comment. As someone who's cut it a little close on dropping 1456 01:16:16,100 --> 01:16:19,750 off a daughter at a dance here, I agree, this lot needs some work- ... 1457 01:16:19,750 --> 01:16:21,980 because you have people leaving and coming at the same time. 1458 01:16:22,110 --> 01:16:22,110 Yeah. 1459 01:16:22,140 --> 01:16:23,260 Circulation is a challenge. 1460 01:16:23,690 --> 01:16:23,690 Yeah. 1461 01:16:23,720 --> 01:16:26,860 Youth, kids, it's been more than once of like, "Nope, you can't run in. 1462 01:16:26,940 --> 01:16:27,100 Stop"- 1463 01:16:27,140 --> 01:16:27,300 Yep 1464 01:16:27,320 --> 01:16:31,219 ... car. So, glad to see that with this, there's some thinking about that and kind 1465 01:16:31,260 --> 01:16:33,960 of the unique use of that building. So that's all. 1466 01:16:37,420 --> 01:16:37,880 Anybody else? 1467 01:16:40,780 --> 01:16:41,400 Yes, Jason. 1468 01:16:42,100 --> 01:16:42,700 Thank you, Mr. Chair. 1469 01:16:43,800 --> 01:16:47,780 So, I assume this is the dance place there, or 1470 01:16:47,800 --> 01:16:49,260 is this, what's causing the- 1471 01:16:49,360 --> 01:16:51,440 The applicant before you is the 1472 01:16:53,620 --> 01:16:55,430 owner of the lot, not necessarily the- 1473 01:16:55,690 --> 01:16:55,690 Okay 1474 01:16:55,690 --> 01:16:58,540 ... owner or the tenant of the dance studio. 1475 01:16:58,820 --> 01:17:02,280 So which business or businesses are causing- 1476 01:17:03,420 --> 01:17:03,800 Oh, yeah. 1477 01:17:03,900 --> 01:17:03,910 The- 1478 01:17:03,910 --> 01:17:06,410 To answer your question, yes, I believe some of that congestion, yes, in the 1479 01:17:06,480 --> 01:17:08,940 evening programming from the dance studio, et cetera. Yes, absolutely. 1480 01:17:09,160 --> 01:17:12,260 Okay. So I drive by here all the time, and 1481 01:17:12,380 --> 01:17:13,900 along Larabee, 1482 01:17:14,880 --> 01:17:18,860 it seems like it's always empty. It doesn't seem like there's ever anybody there. 1483 01:17:18,900 --> 01:17:19,760 On the front, yeah. 1484 01:17:19,960 --> 01:17:23,760 Not on the Larabee side. Which, yeah, you have to walk around the building. 1485 01:17:24,280 --> 01:17:24,460 Mm-hmm. 1486 01:17:26,220 --> 01:17:30,020 Any thought... I'd be okay if you got rid of those parking spaces along 1487 01:17:30,040 --> 01:17:33,200 Larabee and then added those ones, kind of swap it, 1488 01:17:34,260 --> 01:17:36,440 put in some trees in the front there, some nice landscaping, 1489 01:17:37,260 --> 01:17:39,260 beautify the building, add more parking in the back. 1490 01:17:40,600 --> 01:17:40,800 Yeah. 1491 01:17:43,200 --> 01:17:43,740 Just an option. 1492 01:17:45,340 --> 01:17:48,720 Thank you, Jason. And you know it's me with landscaping as well. 1493 01:17:48,780 --> 01:17:52,740 The nice thing with something like this, I've never saw this where we were adding 1494 01:17:52,780 --> 01:17:56,020 more parking spots either as well. I don't think it's ever come up. 1495 01:17:57,360 --> 01:18:01,120 But the fact that in lieu of that, that we do have a plan in 1496 01:18:01,200 --> 01:18:04,460 place, because I already mentioned, I already put it down, an increased 1497 01:18:04,480 --> 01:18:06,500 plantings somewhere else in the city. 1498 01:18:06,560 --> 01:18:09,640 If you can't put them here to upgrade to somewhere to 1499 01:18:09,660 --> 01:18:13,100 beautification. You've mentioned beautification and 1500 01:18:13,200 --> 01:18:15,840 safety. What is that about? 1501 01:18:17,180 --> 01:18:20,000 So there isn't a specific project that that would be applied to right now. 1502 01:18:20,060 --> 01:18:22,140 That's just the standard in the ordinance is that 1503 01:18:23,120 --> 01:18:24,680 it would be required to... 1504 01:18:27,340 --> 01:18:27,960 Because a certain fund. 1505 01:18:27,980 --> 01:18:29,880 Safety and appearance improvements 1506 01:18:30,700 --> 01:18:34,100 is the general terminology for the use of the funds. 1507 01:18:34,360 --> 01:18:35,340 Okay. I would 1508 01:18:36,320 --> 01:18:38,020 suggest on something like this, 1509 01:18:39,040 --> 01:18:43,020 because of the plantings, to use it in a planting of somewhere 1510 01:18:43,040 --> 01:18:43,819 else in the... 1511 01:18:44,940 --> 01:18:45,740 The flower fund. 1512 01:18:46,980 --> 01:18:49,560 Yeah, call it the flower fund, or a tree fund- 1513 01:18:49,570 --> 01:18:49,570 Tree fund 1514 01:18:49,660 --> 01:18:49,660 ... 1515 01:18:50,740 --> 01:18:54,700 or something to that where we can add, like when we have trees that do 1516 01:18:54,780 --> 01:18:58,490 die in the city, that I know we do a lot of plantings along the roads, along 1517 01:18:58,540 --> 01:19:02,160 wayside, and they're looking good. Obviously, sometimes they do die. 1518 01:19:02,480 --> 01:19:06,300 We have to replace them at a cost. So, some type of fund where 1519 01:19:06,360 --> 01:19:10,220 we can use that money to replace the trees or 1520 01:19:10,280 --> 01:19:13,340 do some extra landscaping. I know that Row 4 does it. 1521 01:19:13,400 --> 01:19:17,340 I know in the middle, where they are, at the McDonald's 1522 01:19:17,700 --> 01:19:21,640 intersection, they put the landscaping projects right 1523 01:19:21,700 --> 01:19:25,660 in the middle of the roadway. So, I'd be up to seeing something where that money 1524 01:19:25,680 --> 01:19:29,600 would go directly into a landscaping project versus 1525 01:19:29,920 --> 01:19:31,980 just in a general appearance fund. 1526 01:19:32,000 --> 01:19:35,840 Because I know where some monies go, sometimes it gets 1527 01:19:35,860 --> 01:19:39,540 allocated in a different way or a different place, and that's where I was curious. 1528 01:19:40,300 --> 01:19:43,780 I would certainly, if we can't do landscaping here, I would certainly encourage it 1529 01:19:43,820 --> 01:19:45,620 to be somewhere else in the city. So, my 1530 01:19:47,080 --> 01:19:47,920 two cents on that. 1531 01:19:47,960 --> 01:19:48,080 Mm-hmm. 1532 01:19:49,080 --> 01:19:49,640 Anybody else? 1533 01:19:49,920 --> 01:19:50,780 Just one last point. 1534 01:19:52,480 --> 01:19:56,340 What I've experienced, I didn't experience the dance 1535 01:19:56,380 --> 01:19:58,740 studio. I experienced Jokers used to be back there, and 1536 01:19:59,800 --> 01:20:03,600 people just rocketing straight through from Amato's, and I like how you have 1537 01:20:03,620 --> 01:20:07,540 this turn here where they're kind of required to turn into the lane furthest away 1538 01:20:07,560 --> 01:20:10,060 from the building. Will there be signage telling people that that's where they got 1539 01:20:10,080 --> 01:20:10,560 to go? 1540 01:20:10,640 --> 01:20:13,760 Yeah. The intent, and I believe it was also mentioned at staff comment, 1541 01:20:14,560 --> 01:20:18,140 is at this scale, we didn't include specific locations of signage, 1542 01:20:18,220 --> 01:20:21,940 but the intent would absolutely be signed appropriately and to deter 1543 01:20:22,632 --> 01:20:25,732 ... those going two-way. It is two-way 1544 01:20:25,932 --> 01:20:29,442 traffic to some of the comments between 1545 01:20:29,512 --> 01:20:33,032 there, the two buildings until you get to the rear and the property line 1546 01:20:33,092 --> 01:20:34,332 extends upward. 1547 01:20:35,632 --> 01:20:37,572 And that creates that pinch point, right? 1548 01:20:37,612 --> 01:20:41,132 The intent would be really from that point, you get your one-way because you're 1549 01:20:41,272 --> 01:20:42,332 right. There's traffic 1550 01:20:43,552 --> 01:20:46,272 for the adjacent parcel and this parcel. 1551 01:20:46,772 --> 01:20:50,592 One is 90, one is one-way. They both use a wide 1552 01:20:50,672 --> 01:20:53,802 piece of pavement there, and when you actually get towards that rear and you round 1553 01:20:53,832 --> 01:20:57,282 the corner there, that is the intent of you're not supposed to be coming out that 1554 01:20:57,312 --> 01:20:57,492 way. 1555 01:20:57,532 --> 01:20:57,542 Right. 1556 01:20:57,572 --> 01:20:59,692 This is in only this direction. Yep. 1557 01:20:59,772 --> 01:21:00,032 Thank you. 1558 01:21:03,032 --> 01:21:04,452 Thank you, John. Anybody else? 1559 01:21:08,072 --> 01:21:10,732 I see none. With that, can I get a motion, please? 1560 01:21:11,912 --> 01:21:12,752 This is in workshop. 1561 01:21:12,812 --> 01:21:14,512 Oh, it's a workshop. I don't need a motion. 1562 01:21:15,362 --> 01:21:17,132 Well, thank you for that. 1563 01:21:18,492 --> 01:21:21,842 So with that, this is also for a public comment. 1564 01:21:22,272 --> 01:21:26,122 I didn't give the public an opportunity to speak on this, but if there's 1565 01:21:26,172 --> 01:21:29,952 anybody through the public that's in the audience would like to speak on the 1566 01:21:30,012 --> 01:21:31,672 addition of parking spaces, 1567 01:21:32,512 --> 01:21:35,072 please come up. I see none. Anybody through Zoom? 1568 01:21:36,152 --> 01:21:39,712 If there's anyone participating via Zoom and would like to speak, please raise your 1569 01:21:39,722 --> 01:21:40,052 hand. 1570 01:21:42,472 --> 01:21:42,952 Seeing none. 1571 01:21:43,192 --> 01:21:43,972 Okay. Thank you. 1572 01:21:45,592 --> 01:21:46,752 All right. Well, thank you very much. 1573 01:21:47,012 --> 01:21:48,992 Thank you for your time and consideration of the project. 1574 01:21:49,312 --> 01:21:50,092 Thanks. Have a good night. 1575 01:21:50,232 --> 01:21:50,532 You, too. 1576 01:21:51,562 --> 01:21:54,412 Okay, Orlando, can you read the next item into the record, please? 1577 01:21:57,012 --> 01:22:00,972 Item number 26-000630, 1578 01:22:00,992 --> 01:22:04,742 site plan subdivision 267 Conant Street, MGM Builders, 1579 01:22:04,832 --> 01:22:08,712 Inc. The applicant is requesting to construct three multifamily residential 1580 01:22:08,792 --> 01:22:12,652 buildings totaling in 36 dwelling units, and to establish a pad 1581 01:22:12,712 --> 01:22:16,272 site for a future development of a 4,000 square foot commercial building. 1582 01:22:16,932 --> 01:22:20,592 Tax Map 031, Lot 033, Zoned City 1583 01:22:20,672 --> 01:22:22,772 Center, Use Dwelling, Multiple Family. 1584 01:22:24,372 --> 01:22:24,712 Thank you. 1585 01:22:26,552 --> 01:22:28,992 And I see Dustin's up at the microphone again. Hi, Dustin. 1586 01:22:29,432 --> 01:22:30,432 Here again. So 1587 01:22:32,272 --> 01:22:32,932 , all right. 1588 01:22:36,132 --> 01:22:39,232 So Dustin Roma again with DM Roma Consulting Engineers, 1589 01:22:39,852 --> 01:22:42,272 representing MGM Builders with this application. 1590 01:22:43,752 --> 01:22:47,222 So for those of you that were on the board five or six years 1591 01:22:47,272 --> 01:22:51,132 ago, this project was presented at 1592 01:22:51,192 --> 01:22:54,862 length to the planning board or a project on this 1593 01:22:54,872 --> 01:22:58,812 property that is somewhat similar to what we're proposing here. 1594 01:22:59,412 --> 01:23:03,292 At the time, we had worked through the development of plans for 1595 01:23:03,532 --> 01:23:06,352 a exclusively commercial development. 1596 01:23:06,412 --> 01:23:09,792 It had multiple individual smaller buildings. 1597 01:23:11,352 --> 01:23:13,932 And it never went all the way through to final approval. 1598 01:23:14,072 --> 01:23:14,832 We basically 1599 01:23:16,652 --> 01:23:20,212 had run into a scheduling conflict with a upcoming 1600 01:23:20,332 --> 01:23:23,952 paving moratorium, and we really weren't able to proceed into a 1601 01:23:24,012 --> 01:23:27,962 final plan approval. So this applicant has still 1602 01:23:27,992 --> 01:23:31,892 retained ownership of the property, and it's basically just kind of sat for 1603 01:23:32,192 --> 01:23:35,652 four or five years now. In that time, they've kind of 1604 01:23:35,692 --> 01:23:39,502 reconsidered the use of the property and worked 1605 01:23:39,512 --> 01:23:40,972 through some development options. 1606 01:23:41,122 --> 01:23:44,222 And what we have in front of you here as a proposal is a 1607 01:23:44,232 --> 01:23:48,152 predominantly residential-use development with 1608 01:23:48,572 --> 01:23:52,292 a mixed-use component for a 4,000 square foot 1609 01:23:53,192 --> 01:23:56,792 commercial building that we're showing along the front of the site. 1610 01:23:57,372 --> 01:24:01,352 At this time, we have no intended tenant for that 4,000-foot 1611 01:24:01,432 --> 01:24:03,512 building. It's really being designed as a pad site. 1612 01:24:04,392 --> 01:24:04,912 Certainly, 1613 01:24:06,112 --> 01:24:09,992 we will need to make some accommodations for it so that we can discuss things like 1614 01:24:10,052 --> 01:24:12,352 parking and traffic and wastewater disposal. 1615 01:24:12,392 --> 01:24:15,912 All of those things, we're going to have to make some guidelines and 1616 01:24:15,952 --> 01:24:18,372 assumptions as to maybe what might go into that building. 1617 01:24:19,192 --> 01:24:21,452 But right now, we're just basically showing it as a pad site. 1618 01:24:24,692 --> 01:24:28,612 One of the nice things about that building being there as well, we've got 1619 01:24:28,692 --> 01:24:32,272 basically two kind of prominent buildings that will be up 1620 01:24:32,812 --> 01:24:36,712 near Conant Street. So we'll have this commercial building as well 1621 01:24:36,792 --> 01:24:40,742 as one of the multifamily buildings that'll really be what 1622 01:24:40,792 --> 01:24:43,482 you see as you drive by the site or as you pull in. 1623 01:24:44,092 --> 01:24:46,312 And really, all the parking is going to be in the back. 1624 01:24:46,732 --> 01:24:50,012 So you'll just have this driveway entrance coming in, 1625 01:24:50,892 --> 01:24:54,852 and the primary visibility of what you'll see are the buildings. 1626 01:24:56,312 --> 01:24:59,392 We will be extending the sidewalk along Conant Street, 1627 01:25:00,552 --> 01:25:01,692 heading to the east, 1628 01:25:02,732 --> 01:25:04,012 and ending at the 1629 01:25:04,912 --> 01:25:06,632 condo project that's adjacent to us. 1630 01:25:07,532 --> 01:25:10,592 What's not shown on this plan is that the sidewalk that 1631 01:25:12,112 --> 01:25:15,432 from the west has been extended up to that 1632 01:25:15,572 --> 01:25:19,112 driveway that is basically adjacent to our 1633 01:25:19,132 --> 01:25:19,572 property. 1634 01:25:20,792 --> 01:25:24,492 That development that occurred, the 17-unit development there that was 1635 01:25:24,532 --> 01:25:26,952 built within the last two years, 1636 01:25:27,792 --> 01:25:30,272 that project, it did extend the sidewalk up the road. 1637 01:25:30,332 --> 01:25:33,692 So now we're going to continue to kind of integrate this 1638 01:25:33,732 --> 01:25:37,532 connectivity of sidewalks as we go up through Conant Street. 1639 01:25:41,212 --> 01:25:45,152 We've got the building designs are still being worked on. 1640 01:25:45,652 --> 01:25:49,512 As you can see from this layout, they're more of a rectangular shape building 1641 01:25:49,552 --> 01:25:53,492 as opposed to a square. So it'll be potentially something that's 1642 01:25:53,552 --> 01:25:55,732 a little different than what you've seen a lot of. 1643 01:25:56,952 --> 01:25:59,372 We've got integrated sidewalks throughout the development. 1644 01:26:00,412 --> 01:26:03,892 And then certainly the number of parking spaces will take into 1645 01:26:03,932 --> 01:26:07,852 account that mixed-use component with the commercial piece as 1646 01:26:07,912 --> 01:26:08,652 well. 1647 01:26:09,532 --> 01:26:13,452 This development has a single dumpster location all 1648 01:26:13,492 --> 01:26:14,692 the way in the back of the site. 1649 01:26:15,832 --> 01:26:19,692 We've identified certainly a desire to have a second dumpster 1650 01:26:19,732 --> 01:26:23,542 location. That certainly is kind of far away from some of the units, and with the 1651 01:26:23,612 --> 01:26:26,732 number of units being proposed here, we think maybe a second location would 1652 01:26:26,772 --> 01:26:30,422 also function pretty well here. So we will 1653 01:26:30,472 --> 01:26:34,252 be perhaps rearranging some of the site a little bit to 1654 01:26:34,292 --> 01:26:37,531 accommodate a second, more central dumpster pad area. 1655 01:26:46,896 --> 01:26:49,396 Yeah, we'll be bringing sewer into the site from Conant Street. 1656 01:26:49,536 --> 01:26:53,456 There we do have an existing gravity main that's there across 1657 01:26:53,496 --> 01:26:54,016 the street. 1658 01:26:56,176 --> 01:26:56,876 And then 1659 01:26:58,496 --> 01:27:02,336 with the number of units here, we will take a look at 1660 01:27:02,966 --> 01:27:06,076 traffic and just the traffic that's being generated from the project. 1661 01:27:06,136 --> 01:27:09,856 Just again, make sure we're not triggering any warrants for things like left 1662 01:27:09,876 --> 01:27:13,616 turns and those sort of things. So we'll take a look at that in detail, 1663 01:27:14,276 --> 01:27:17,316 just to make sure that the traffic functions will adequate or will function 1664 01:27:17,376 --> 01:27:17,876 adequately. 1665 01:27:19,796 --> 01:27:23,766 For lighting, we will likely have some pole-mounted lighting on this 1666 01:27:23,796 --> 01:27:27,026 project. It's not shown on this plan, but we anticipate some of 1667 01:27:27,076 --> 01:27:31,036 these landscape islands that we have around the site, as well as around the 1668 01:27:31,076 --> 01:27:34,916 perimeter. We do have some parking areas that are located not immediately adjacent 1669 01:27:34,956 --> 01:27:38,436 to the building, so we do anticipate some pole-mounted lighting. 1670 01:27:39,356 --> 01:27:39,876 We'll have 1671 01:27:40,896 --> 01:27:43,736 landscaping put together from a landscape architect. 1672 01:27:44,576 --> 01:27:48,176 And we'll have some nice building elevations for you to look at as well and 1673 01:27:48,236 --> 01:27:51,576 comment on when we come back in with our full plan. 1674 01:27:55,856 --> 01:27:59,036 So this is more of an introduction again, to kind of just get 1675 01:27:59,056 --> 01:28:01,776 everybody back familiar with this project again. 1676 01:28:03,096 --> 01:28:06,566 We're going to use a lot of the stormwater and 1677 01:28:06,636 --> 01:28:10,136 utility kind of design components that we had previously. 1678 01:28:10,216 --> 01:28:14,186 But the site layout has changed a fair amount, so some of 1679 01:28:14,216 --> 01:28:15,996 that'll be reworked. 1680 01:28:17,556 --> 01:28:21,446 And we'll also run some multiple turning templates through the 1681 01:28:21,476 --> 01:28:23,216 site just to kind of demonstrate how... 1682 01:28:23,296 --> 01:28:27,206 Because we have a bunch of little dead-end areas on 1683 01:28:27,256 --> 01:28:30,976 this site, which a big looped configuration I think would be 1684 01:28:31,036 --> 01:28:34,776 better, but we're also, again, trying to leave some green space on this 1685 01:28:34,816 --> 01:28:37,076 property and not just continue on with 1686 01:28:38,056 --> 01:28:38,676 further 1687 01:28:40,156 --> 01:28:43,736 parking areas in the back. And trying to leave some of these landscaped 1688 01:28:43,876 --> 01:28:47,436 islands in between all the parking areas to try to introduce some green space. 1689 01:28:47,516 --> 01:28:47,696 So, 1690 01:28:48,556 --> 01:28:52,476 it is kind of a balance to just have continuous loops 1691 01:28:52,496 --> 01:28:56,196 all through the site as opposed to these kind of dead-end 1692 01:28:56,256 --> 01:28:58,916 parking areas that 1693 01:28:59,016 --> 01:29:01,675 end up resulting in 1694 01:29:02,776 --> 01:29:06,656 having the right number of parking spaces, but maybe not having as much drive 1695 01:29:06,716 --> 01:29:07,056 aisles. 1696 01:29:08,876 --> 01:29:12,816 Looking at that kind of double-stacked parking lot that's there as well, could be 1697 01:29:12,836 --> 01:29:16,196 an opportunity maybe to kind of push those buildings back a little bit on the rear, 1698 01:29:16,296 --> 01:29:20,156 maybe create some landscape in between that parking area so it's not just one 1699 01:29:20,216 --> 01:29:23,776 big massive parking in between the commercial 1700 01:29:23,876 --> 01:29:27,296 building and to the rear of that. So again, there's some 1701 01:29:27,356 --> 01:29:31,196 opportunities there that we'll continue to tweak this plan before we come back and 1702 01:29:31,256 --> 01:29:33,976 have it in front of you again for review. 1703 01:29:34,396 --> 01:29:37,236 But again, we thought this was a good opportunity to bring it back up. 1704 01:29:37,936 --> 01:29:41,876 If you have any comments or suggestions, we'd love to hear them tonight. 1705 01:29:41,906 --> 01:29:45,395 And we'll certainly take those into account as we further develop these plans. 1706 01:29:45,616 --> 01:29:47,096 So, thank you. 1707 01:29:47,156 --> 01:29:47,396 Thank you. 1708 01:29:48,456 --> 01:29:48,756 Becca? 1709 01:29:50,036 --> 01:29:53,236 Nothing further to add specific to the development. 1710 01:29:53,316 --> 01:29:56,096 I'm looking forward to see this return. 1711 01:29:56,596 --> 01:29:59,216 But I did just want to point out to the board, the plans that you received in your 1712 01:29:59,286 --> 01:30:02,316 packet and was showing tonight, it does show that this is a split-zone parcel. 1713 01:30:02,656 --> 01:30:06,396 This is not a split-zone parcel. There was an exercise that this board went through 1714 01:30:06,436 --> 01:30:09,656 a couple of years ago where we looked at some of the split-zone parcels, 1715 01:30:09,736 --> 01:30:12,716 specifically within the city center district, to try to have the 1716 01:30:14,536 --> 01:30:18,456 zone district align with the parcel lines, and this was one of the ones that was 1717 01:30:18,476 --> 01:30:22,216 addressed. So, this is actually entirely within the city center district. 1718 01:30:22,256 --> 01:30:23,476 It's no longer split-zoned. 1719 01:30:24,156 --> 01:30:25,196 Thanks for that comment. 1720 01:30:27,076 --> 01:30:30,916 I was going to bring that up, but I remember doing that on this one 1721 01:30:30,976 --> 01:30:31,636 as well. So, 1722 01:30:34,956 --> 01:30:37,736 with that, this is a public hearing or a public comment section. 1723 01:30:37,865 --> 01:30:40,836 Does anybody from the public wish to speak on this project? 1724 01:30:42,936 --> 01:30:45,176 I'm seeing none. Anybody through Zoom? 1725 01:30:46,596 --> 01:30:49,936 If there's anyone participating via Zoom and would like to speak, please raise your 1726 01:30:49,946 --> 01:30:50,236 hand. 1727 01:30:52,376 --> 01:30:52,996 I'm seeing none. 1728 01:30:53,476 --> 01:30:54,036 Okay. Thank you. 1729 01:30:54,876 --> 01:30:57,675 With that, can we have any board comments on this project? 1730 01:31:00,876 --> 01:31:01,636 Robin. Hi. 1731 01:31:01,876 --> 01:31:05,356 Hi. Thanks. I think this is a really good use of this parcel. 1732 01:31:07,416 --> 01:31:10,556 It's a tough one, let me zoom out, to lay out. 1733 01:31:10,696 --> 01:31:14,596 But I find you talked about that heavy parking area to the 1734 01:31:14,636 --> 01:31:18,376 right. It's very not residential. 1735 01:31:18,396 --> 01:31:20,336 And I just wonder what other options they can... 1736 01:31:20,396 --> 01:31:21,026 The buildings, 1737 01:31:22,116 --> 01:31:25,246 even in the previous project that we were talking about with the two buildings 1738 01:31:25,296 --> 01:31:28,116 together, they had relationship to each other, and these don't. 1739 01:31:28,136 --> 01:31:31,796 And I see some of the challenges, but I wonder, the two 1740 01:31:31,916 --> 01:31:34,296 opposite each other, if the one at the bottom could be 1741 01:31:35,476 --> 01:31:39,336 paired, essentially, with the top right one and the parking moved aside. 1742 01:31:39,376 --> 01:31:39,476 They're 1743 01:31:40,276 --> 01:31:41,296 so disparate. 1744 01:31:43,236 --> 01:31:47,116 And I would think that for the lower building, half of it looks out at 1745 01:31:47,156 --> 01:31:51,096 a potential commercial site. I just wonder if there's more work that can be done to 1746 01:31:51,156 --> 01:31:55,056 separate the residential component from the commercial component. 1747 01:31:57,216 --> 01:31:58,036 I don't know how 1748 01:31:58,936 --> 01:32:00,116 you get to do that with trace paper. 1749 01:32:02,676 --> 01:32:04,516 Just to make it feel residential. 1750 01:32:05,316 --> 01:32:08,476 I like what you said about possibly moving the buildings back, more landscaping. 1751 01:32:08,506 --> 01:32:11,796 It looks like whatever concept there is, it will also be this. 1752 01:32:11,836 --> 01:32:13,486 And I get it. You actually go around, 1753 01:32:14,436 --> 01:32:18,396 the part that faces the parking spots is not the front, it's sort of 1754 01:32:18,436 --> 01:32:22,426 the side. And that has to do with building design and how many entries there 1755 01:32:22,476 --> 01:32:24,896 are, instead of one big central entry. That's fine. 1756 01:32:24,916 --> 01:32:26,556 But I think there's opportunities there. 1757 01:32:26,576 --> 01:32:27,936 And I also would just think 1758 01:32:29,396 --> 01:32:30,476 for that lower building, 1759 01:32:31,396 --> 01:32:33,596 most of the parking is over to the side. 1760 01:32:33,656 --> 01:32:33,776 So, 1761 01:32:34,636 --> 01:32:35,446 I think there's 1762 01:32:36,356 --> 01:32:39,636 more design work to do there to really 1763 01:32:39,696 --> 01:32:43,336 differentiate those two areas. I also noticed, but then I saw it in the 1764 01:32:43,376 --> 01:32:46,056 comments that the handicap spots aren't equally distributed. 1765 01:32:46,076 --> 01:32:46,636 But I know you're 1766 01:32:47,184 --> 01:32:48,504 You haven't gotten to that level of detail. 1767 01:32:48,624 --> 01:32:52,564 So, I think it's a nice use of it, and I'd like to 1768 01:32:52,604 --> 01:32:55,784 see it have a stronger delineation of uses. 1769 01:32:56,844 --> 01:32:57,124 Thanks. 1770 01:33:00,484 --> 01:33:00,984 Anybody else? 1771 01:33:02,264 --> 01:33:02,544 Nancy? 1772 01:33:02,684 --> 01:33:02,864 Yeah. 1773 01:33:03,724 --> 01:33:07,304 I have a question in terms of the commercial building. 1774 01:33:07,364 --> 01:33:07,684 What 1775 01:33:08,944 --> 01:33:12,844 would be the front of that? Is it the parking lot side 1776 01:33:12,884 --> 01:33:14,734 or is it Conan Street? 1777 01:33:15,624 --> 01:33:15,824 Yeah. 1778 01:33:16,764 --> 01:33:18,344 So we haven't really laid that out yet. 1779 01:33:18,684 --> 01:33:21,414 I would anticipate that we could have 1780 01:33:23,204 --> 01:33:25,544 an entrance on there where we have the sidewalk out there. 1781 01:33:25,784 --> 01:33:28,924 We could potentially have an entrance that comes in the front of that building. 1782 01:33:30,304 --> 01:33:30,844 But the 1783 01:33:31,704 --> 01:33:35,533 idea was that the entry point for customers, employees, things 1784 01:33:35,584 --> 01:33:37,084 like that, would be from the back, 1785 01:33:38,444 --> 01:33:40,314 and that we would just create almost a 1786 01:33:41,544 --> 01:33:43,384 Main Street type look on the front. 1787 01:33:43,464 --> 01:33:45,264 So you'd have a street side view, 1788 01:33:46,064 --> 01:33:49,984 almost like a Main Street type look on the roadside, and then leaving 1789 01:33:50,004 --> 01:33:53,764 ample space there between the building and the road for landscaping. 1790 01:33:53,864 --> 01:33:54,324 So we've got that 1791 01:33:55,244 --> 01:33:58,944 wide green space in there that, in this plan, it looks like it's all 1792 01:33:59,004 --> 01:34:01,844 lawn, but it would all be nicely landscaped in front of the building. 1793 01:34:03,444 --> 01:34:05,864 It might be a good idea to consider a bike rack 1794 01:34:06,724 --> 01:34:10,544 out front of that too, because it's city center and 1795 01:34:10,924 --> 01:34:12,144 it would be bikeable. 1796 01:34:13,104 --> 01:34:13,564 Agreed. 1797 01:34:17,284 --> 01:34:17,704 Mr. Chair? 1798 01:34:18,024 --> 01:34:18,563 John. 1799 01:34:18,864 --> 01:34:21,004 Just echoing what Robin and Nancy said, that 1800 01:34:22,624 --> 01:34:26,584 I believe we have to have businesses who face the road that at least look 1801 01:34:26,644 --> 01:34:29,114 like the front of the building. Is there something- 1802 01:34:29,164 --> 01:34:30,064 Not at this location. 1803 01:34:30,104 --> 01:34:30,754 Not at this location. 1804 01:34:30,774 --> 01:34:30,774 No. 1805 01:34:30,784 --> 01:34:33,204 Okay. Because it never really works. 1806 01:34:33,644 --> 01:34:35,483 Everyone tries to make it work, and it never quite works. 1807 01:34:35,544 --> 01:34:36,824 But as long as it, like you said, 1808 01:34:38,184 --> 01:34:41,474 you make an effort at that look, and there will be some landscaping between. 1809 01:34:42,184 --> 01:34:45,144 Because the alternative, of course, is to have the parking facing the street, which 1810 01:34:45,504 --> 01:34:47,294 this is going to be much better as you drive by. 1811 01:34:47,314 --> 01:34:49,984 You're going to see the buildings, and the parking's behind it. 1812 01:34:51,424 --> 01:34:54,384 I feel you're going to run yourself in circles with the tracing paper trying to 1813 01:34:54,504 --> 01:34:57,124 rotate these buildings and move them back, but see what you can do. 1814 01:34:58,264 --> 01:35:00,004 I don't have a problem with the 1815 01:35:02,484 --> 01:35:06,284 placement of the buildings, and I can see that you're limited on 1816 01:35:06,404 --> 01:35:10,024 where you can put them. So I'll be just interested to see how you're able to play 1817 01:35:10,064 --> 01:35:13,984 with that. But other than that, I do like, as I said before, how as 1818 01:35:14,004 --> 01:35:16,264 you drive by, you're going to see the buildings and the parking's going to be 1819 01:35:16,304 --> 01:35:20,303 behind that. I think that's going to be a good look from Conan Street. Thank you. 1820 01:35:21,984 --> 01:35:24,464 Thank you, John. Anybody else? Yes, Jason. 1821 01:35:25,004 --> 01:35:25,504 Thank you, Mr. Chair. 1822 01:35:26,504 --> 01:35:30,344 So I do remember this site. It's where that huge red 1823 01:35:30,384 --> 01:35:31,784 house used to be that was torn down. 1824 01:35:32,144 --> 01:35:32,154 Yeah. 1825 01:35:32,164 --> 01:35:33,724 I always wondered what happened to that project. 1826 01:35:33,844 --> 01:35:33,964 So 1827 01:35:35,044 --> 01:35:35,324 here we go. 1828 01:35:36,284 --> 01:35:39,644 I agree with others. Your parking lot definitely needs a little feng shui or 1829 01:35:39,684 --> 01:35:40,124 something. 1830 01:35:40,944 --> 01:35:43,544 It needs some help, but the only thing really 1831 01:35:45,364 --> 01:35:49,234 I think here is the single family over to the end, the home over to the 1832 01:35:49,284 --> 01:35:52,524 left side there. I guess give them just a little breathing room. 1833 01:35:53,084 --> 01:35:53,244 Yep. 1834 01:35:53,504 --> 01:35:56,004 And I'm sure they'd appreciate that, so. 1835 01:35:56,044 --> 01:35:56,184 But 1836 01:35:57,864 --> 01:35:57,993 yeah. 1837 01:36:01,064 --> 01:36:02,904 Looking forward to seeing the next revision. 1838 01:36:03,944 --> 01:36:04,824 Thanks, Jason. Oriana? 1839 01:36:05,784 --> 01:36:09,704 I'm curious who owns the land behind it down to the 1840 01:36:09,744 --> 01:36:13,004 river, if any of that connects to the 1841 01:36:13,104 --> 01:36:16,944 city-owned land along the river that I think is intended to be developed 1842 01:36:17,004 --> 01:36:19,114 as a more formal trail out that way. 1843 01:36:20,004 --> 01:36:22,804 Just, if there's any chance of connecting back there to the trail. 1844 01:36:24,524 --> 01:36:28,504 I know we've got private ownership in between this lot and 1845 01:36:28,564 --> 01:36:30,604 maybe what might be city land further back. 1846 01:36:31,304 --> 01:36:31,314 Okay. 1847 01:36:31,344 --> 01:36:31,974 There's one, 1848 01:36:33,064 --> 01:36:36,564 the landowner that owns the strip of land between this 1849 01:36:36,604 --> 01:36:38,084 project and, 1850 01:36:40,204 --> 01:36:43,544 I forget what the condos are. They're called, is it Gateway or ... 1851 01:36:43,564 --> 01:36:44,854 But yeah, the condo project that's here. 1852 01:36:44,884 --> 01:36:48,724 There's a strip of land that comes up, and then merges in with a larger parcel in 1853 01:36:48,744 --> 01:36:50,984 the back that's really just for a single family home. 1854 01:36:52,124 --> 01:36:54,364 That's primarily in the rural zone. 1855 01:36:56,104 --> 01:36:56,874 And then, 1856 01:36:59,924 --> 01:37:02,804 yeah, it's privately owned around the perimeter, I know. 1857 01:37:02,904 --> 01:37:05,704 So we don't directly abut any of that city-owned land, but... 1858 01:37:05,864 --> 01:37:07,644 It's quite a bit away from where the- 1859 01:37:07,903 --> 01:37:08,104 Yeah 1860 01:37:08,114 --> 01:37:11,684 ... city land was. But there are two large parcels in there, 1861 01:37:12,104 --> 01:37:15,864 and kind of looping back to our conversation earlier, I think if a 1862 01:37:15,904 --> 01:37:18,984 project were to happen on either of those, I'm not saying it will, it's private 1863 01:37:19,004 --> 01:37:22,644 property, but if it were, that would be an instance where I think there may be a 1864 01:37:22,704 --> 01:37:26,364 benefit for a public easement on the back for eventual continuation of the trail. 1865 01:37:26,504 --> 01:37:28,304 But we're quite a bit away at the moment. 1866 01:37:28,684 --> 01:37:31,984 Yeah. And is there a sidewalk all the way to Conan Street from there? 1867 01:37:33,044 --> 01:37:33,364 No. 1868 01:37:34,364 --> 01:37:35,604 Basically, this would be 1869 01:37:36,524 --> 01:37:39,184 the end of it, so we're just kind of continuing it on. 1870 01:37:39,884 --> 01:37:43,284 Okay. I was just thinking about what are the open space 1871 01:37:43,404 --> 01:37:46,544 opportunities, because it is close enough that you would want to walk into town, 1872 01:37:46,604 --> 01:37:50,384 but it's not really good walking infrastructure, but not much you can do about 1873 01:37:50,424 --> 01:37:50,603 that. 1874 01:37:51,584 --> 01:37:51,864 Just... 1875 01:37:59,524 --> 01:38:00,144 Anybody else? 1876 01:38:05,424 --> 01:38:08,864 I see none. I'll just say that it is a good 1877 01:38:08,904 --> 01:38:10,944 location to have a mixed use 1878 01:38:11,784 --> 01:38:15,704 coming in. I like the buildings in the back, that you're not going to see 1879 01:38:15,764 --> 01:38:18,824 the driveways as well once you're in. It's going to be a roadway. 1880 01:38:19,464 --> 01:38:22,544 I'm assuming with all the landscape architect, you're not going to see much of 1881 01:38:22,564 --> 01:38:23,004 anything 1882 01:38:23,864 --> 01:38:27,144 through those back buildings with the front scape. 1883 01:38:28,384 --> 01:38:30,344 The islands, are they going to be landscaped as well? 1884 01:38:30,364 --> 01:38:31,144 Or is that going to be- 1885 01:38:31,464 --> 01:38:31,824 Definitely. 1886 01:38:31,904 --> 01:38:32,124 Is that going to be okay? 1887 01:38:33,324 --> 01:38:36,344 Yeah, I'm looking forward to see you moving on with this project for sure. 1888 01:38:37,384 --> 01:38:41,074 The only thing I can say is, with that other building that is on the left, with 1889 01:38:41,084 --> 01:38:43,324 the parking, I don't know if that can be, 1890 01:38:45,244 --> 01:38:49,224 even if it's beneficial to put that residential building back to the 1891 01:38:49,324 --> 01:38:52,984 right and move the commercial pad To the other side 1892 01:38:53,524 --> 01:38:56,664 and move the driveway over a little bit more towards where that pad is. 1893 01:38:57,264 --> 01:38:58,744 I don't know if that makes any sense. 1894 01:38:58,784 --> 01:39:02,184 That way it keeps all the residentials in one section of the 1895 01:39:02,424 --> 01:39:02,844 parcel- 1896 01:39:03,244 --> 01:39:03,364 Mm-hmm 1897 01:39:03,424 --> 01:39:05,444 ... and then your commercial lot up in the front. 1898 01:39:06,944 --> 01:39:10,364 Yeah, and I think rezoning the property the way the city did 1899 01:39:10,664 --> 01:39:14,184 potentially opens up some doors here, because the way we understood it 1900 01:39:14,244 --> 01:39:17,584 previously, with this being a split zone, and you can see how the zone line was 1901 01:39:17,624 --> 01:39:18,834 running through those multi-buildings. 1902 01:39:18,844 --> 01:39:18,934 Right. 1903 01:39:19,444 --> 01:39:23,414 Our understanding was that the multifamily use was 1904 01:39:23,444 --> 01:39:27,364 not permitted in that rural zoning district, which was behind it, so the 1905 01:39:27,404 --> 01:39:30,424 physical placement of the buildings had to be up in that city center zone. 1906 01:39:30,434 --> 01:39:34,214 So we pushed them as far back as we felt we could while still maintaining 1907 01:39:34,264 --> 01:39:37,854 that zone boundary, because I think we could extend 30 feet into 1908 01:39:37,904 --> 01:39:41,884 the more restrictive zone. So that's kind of how we ended up 1909 01:39:41,904 --> 01:39:45,844 with this building placement. But knowing now that, and Rebecca had mentioned 1910 01:39:45,864 --> 01:39:49,653 that to me previously, that now that we have open city center zoning 1911 01:39:49,704 --> 01:39:50,794 across the whole property, 1912 01:39:52,014 --> 01:39:55,424 there's opportunity now to continue to move these buildings back that wasn't there 1913 01:39:55,444 --> 01:39:56,684 when we were here five years ago. 1914 01:39:56,724 --> 01:39:57,004 Mm-hmm. 1915 01:39:57,044 --> 01:39:57,204 So. 1916 01:40:00,224 --> 01:40:02,824 Well, then I'm looking forward to seeing the new design. 1917 01:40:04,044 --> 01:40:04,444 Yep. 1918 01:40:05,124 --> 01:40:07,334 Because you got your work cut out for that one, too, before your next one. 1919 01:40:07,384 --> 01:40:08,734 Yeah, it'll be a nice project. Yeah. 1920 01:40:08,774 --> 01:40:08,774 Oh, yeah. 1921 01:40:08,784 --> 01:40:09,644 I'm looking forward to it. 1922 01:40:12,704 --> 01:40:13,164 Anybody else? 1923 01:40:13,704 --> 01:40:14,264 No, sir. 1924 01:40:14,404 --> 01:40:16,004 All right. Well, thank you very much, Dustin. 1925 01:40:16,064 --> 01:40:16,424 Thank you. 1926 01:40:19,404 --> 01:40:22,344 Orlando, could you read the next item into record, please? 1927 01:40:24,164 --> 01:40:24,604 Yes. 1928 01:40:26,964 --> 01:40:30,404 Item number 26-000636, 1929 01:40:30,824 --> 01:40:33,224 Subdivision 108 Longfellow Street 1930 01:40:33,564 --> 01:40:36,684 108 LLC. 1931 01:40:37,524 --> 01:40:41,504 The applicant is requesting a three-lot subdivision to create one lot 1932 01:40:41,524 --> 01:40:45,324 for the construction of a single-family dwelling, establish a separate 1933 01:40:45,364 --> 01:40:49,154 lot for the existing three-unit multifamily building, and 1934 01:40:49,184 --> 01:40:53,004 retaining one existing lot with which no development is currently proposed. 1935 01:40:53,904 --> 01:40:57,844 Tax Map 027, Lot 001, Zone Residential Growth 1936 01:40:57,904 --> 01:41:01,143 Area 1, Use Dwelling, Single Family, Multiple Family. 1937 01:41:02,624 --> 01:41:03,944 Thank you. Dustin. 1938 01:41:03,974 --> 01:41:06,504 All right. Good evening. This is my last one for the evenings. 1939 01:41:08,864 --> 01:41:12,764 So Dustin Roma, DM Roma Consulting Engineers, representing the 1940 01:41:12,804 --> 01:41:14,644 applicant here for 108 Longfellow Street. 1941 01:41:14,724 --> 01:41:16,873 Dustin, can you try to speak up a little bit so that the- 1942 01:41:16,964 --> 01:41:16,993 Yes. 1943 01:41:16,993 --> 01:41:17,744 Yep. Thank you. 1944 01:41:17,804 --> 01:41:17,964 Yep. 1945 01:41:20,964 --> 01:41:22,524 Yeah, so this project 1946 01:41:23,504 --> 01:41:26,924 is, at this stage, it's a fairly 1947 01:41:27,004 --> 01:41:29,284 straightforward application where 1948 01:41:30,144 --> 01:41:34,044 we're really not proposing any physical development of this property as 1949 01:41:34,084 --> 01:41:36,004 part of this subdivision request. 1950 01:41:36,924 --> 01:41:40,664 There's an existing driveway with a shared parking area 1951 01:41:40,784 --> 01:41:43,304 for a three-unit building on this property. 1952 01:41:43,344 --> 01:41:45,824 It's 1.7 acres in total. 1953 01:41:46,524 --> 01:41:49,624 This landowner who purchased the 1954 01:41:49,644 --> 01:41:50,664 property 1955 01:41:51,644 --> 01:41:55,373 is looking to essentially just divide it up into three lots, 1956 01:41:56,224 --> 01:41:59,814 and kind of create the canvas for somebody to come in and 1957 01:41:59,824 --> 01:42:02,584 propose some sort of development on this lot. 1958 01:42:02,744 --> 01:42:03,024 So, 1959 01:42:04,444 --> 01:42:05,284 we've got 1960 01:42:06,824 --> 01:42:10,644 a lot created around the three-family with a 1961 01:42:10,684 --> 01:42:11,424 parking area. 1962 01:42:12,544 --> 01:42:15,784 That lot will utilize the existing driveway that's 1963 01:42:15,864 --> 01:42:19,344 there to be shared with lot three, so that 1964 01:42:19,444 --> 01:42:22,804 easement will be retained on that property for access to that 1965 01:42:22,844 --> 01:42:24,104 three-family building. 1966 01:42:24,964 --> 01:42:28,844 We thought it was best to have that easement be owned 1967 01:42:28,884 --> 01:42:32,564 in fee from the future owner of lot three, 1968 01:42:32,724 --> 01:42:36,684 seeing that there will most likely be improvements made to 1969 01:42:36,764 --> 01:42:40,684 that driveway entrance to accommodate whatever development somebody 1970 01:42:40,724 --> 01:42:43,784 may want to do on lot three. Under current zoning, 1971 01:42:45,044 --> 01:42:48,884 we've estimated that nine units could potentially be put on 1972 01:42:48,944 --> 01:42:52,924 lot three. Whether somebody physically wants to do that or whether they want to 1973 01:42:52,944 --> 01:42:54,904 do something else would be up to them. 1974 01:42:56,684 --> 01:42:57,124 And 1975 01:42:58,704 --> 01:43:02,184 so again, we thought it was best to just have the ownership of that 1976 01:43:02,504 --> 01:43:05,824 access way come in, stay with lot three, so that if they're going to be making 1977 01:43:05,844 --> 01:43:09,774 improvements to it, that they would not be working within somebody else's easement, 1978 01:43:09,843 --> 01:43:11,343 but they'd be working on their own land. 1979 01:43:11,843 --> 01:43:15,524 And just making sure that that three-family would 1980 01:43:15,564 --> 01:43:17,084 continue to have access over 1981 01:43:17,904 --> 01:43:21,564 the current road as it exists, as well as an improved road if that was something 1982 01:43:21,584 --> 01:43:22,494 that was done in the future. 1983 01:43:24,444 --> 01:43:27,504 Lot number one has a very tight 1984 01:43:28,544 --> 01:43:30,504 building envelope down in that lower area. 1985 01:43:31,524 --> 01:43:34,784 It's been designed so it has 1986 01:43:35,564 --> 01:43:39,444 enough square footage in there to accommodate a single family home, but nothing 1987 01:43:39,524 --> 01:43:40,144 more than that. 1988 01:43:42,564 --> 01:43:44,884 You can see that it's kind of hatched in on the plan here. 1989 01:43:44,944 --> 01:43:48,684 There's a fairly steep slope that drops down into that 1990 01:43:48,764 --> 01:43:49,124 lot 1991 01:43:50,364 --> 01:43:54,304 from the three-family side. So it's fairly level at the three-family. 1992 01:43:55,034 --> 01:43:58,124 And then where this property line is drawn in is basically right at the top of the 1993 01:43:58,204 --> 01:44:01,744 bank, and then it kind of slopes down, and there's a bunch of trees along that edge 1994 01:44:01,824 --> 01:44:03,034 there. And then 1995 01:44:04,644 --> 01:44:06,164 so we've identified a 1996 01:44:07,044 --> 01:44:09,884 fairly small building envelope on that lot, 1997 01:44:10,804 --> 01:44:12,964 but something that could be accommodated. 1998 01:44:13,704 --> 01:44:17,504 We are in the process right now of just putting together a basic grading 1999 01:44:17,604 --> 01:44:21,483 plan that we're really just using, that the owner will be able to use for 2000 01:44:21,524 --> 01:44:25,304 marketing purposes and stuff, just to kind of show what could potentially go on 2001 01:44:25,364 --> 01:44:25,824 that lot. 2002 01:44:26,784 --> 01:44:30,544 Certainly, any development of really any of these lots, 2003 01:44:30,824 --> 01:44:34,804 other than the three-family home lot, so lots one or three, 2004 01:44:35,564 --> 01:44:39,014 if anything were proposed to be built on there, it would require going 2005 01:44:39,044 --> 01:44:42,184 through preparing a drainage and grading 2006 01:44:42,224 --> 01:44:45,984 plan that would get reviewed by engineering here at the 2007 01:44:46,044 --> 01:44:49,324 city as part of a building permit review process. 2008 01:44:49,364 --> 01:44:53,064 So there is that level of review that will occur. 2009 01:44:53,996 --> 01:44:56,976 But we do kind of want to just get out ahead of it a little bit and make sure we 2010 01:44:57,596 --> 01:45:01,296 show any prospective buyers what our ideas are for 2011 01:45:01,356 --> 01:45:04,106 how that lot number one would be developed, 2012 01:45:05,676 --> 01:45:08,236 to kind of create a building envelope there. 2013 01:45:08,956 --> 01:45:10,956 Lot number three is kind of wide open. 2014 01:45:11,016 --> 01:45:14,816 If somebody wanted to do a few units or single-family 2015 01:45:14,856 --> 01:45:17,276 house or whatever they wanted to do, that would be up to them. 2016 01:45:17,316 --> 01:45:20,976 And you would see that plan back in front of you if somebody were to 2017 01:45:21,016 --> 01:45:24,996 develop lot three in any manner other than a single-family home, I think that you 2018 01:45:25,036 --> 01:45:26,276 guys would see that again. 2019 01:45:26,536 --> 01:45:27,576 Yeah, anything to a three. 2020 01:45:27,956 --> 01:45:28,056 Yeah. 2021 01:45:28,096 --> 01:45:28,476 Three or more. 2022 01:45:28,876 --> 01:45:32,256 Yeah. So you guys would see that as an amendment or as a site plan review. 2023 01:45:37,156 --> 01:45:41,096 So yeah. So other than that's really all we're proposing 2024 01:45:41,136 --> 01:45:43,556 at this time. So, we had a neighborhood meeting. 2025 01:45:45,016 --> 01:45:48,196 They had some questions and unfortunately it was a similar situation to this where 2026 01:45:48,356 --> 01:45:51,905 it's normally we're proposing to build something and they're asking, 2027 01:45:51,976 --> 01:45:55,956 how much of this is gonna get cut back and how much vegetation is being 2028 01:45:55,976 --> 01:45:56,596 removed, and 2029 01:45:57,536 --> 01:46:01,156 the answers that we've been giving people is essentially, if this is approved to 2030 01:46:01,476 --> 01:46:04,116 split this up into three lots, all we're gonna do is basically put 2031 01:46:05,076 --> 01:46:08,736 for sale signs out front and that's the limit of what we're gonna do with this 2032 01:46:08,776 --> 01:46:09,556 project for now. 2033 01:46:11,836 --> 01:46:15,276 So certainly if there's anything that you see here that you'd like us to 2034 01:46:15,296 --> 01:46:18,716 incorporate, we are gonna try and get this turned back around for a full 2035 01:46:18,736 --> 01:46:22,116 application here, hopefully for the meeting coming up 2036 01:46:22,196 --> 01:46:25,976 in September. So I think we'd have to get stuff submitted for 2037 01:46:26,016 --> 01:46:29,976 Thursday, so any feedback you can provide would be greatly appreciated 2038 01:46:30,036 --> 01:46:32,876 so we're prepared for this next submission. So thank you. 2039 01:46:33,456 --> 01:46:33,816 Thank you. 2040 01:46:35,336 --> 01:46:35,716 Rebecca? 2041 01:46:36,736 --> 01:46:37,256 Nothing further. 2042 01:46:37,596 --> 01:46:41,396 Okay. Thank you. With that this is also a public 2043 01:46:41,406 --> 01:46:45,266 comment section. Anybody who wishes to speak on this project, please 2044 01:46:45,336 --> 01:46:47,956 step up to the microphone. You do have three minutes. 2045 01:46:48,196 --> 01:46:50,516 I'm sorry Larry, one thing. I did just wanted to let... 2046 01:46:50,916 --> 01:46:54,896 We did receive too about our notice that our, but our emails today, those 2047 01:46:54,936 --> 01:46:56,196 were provided to the board. 2048 01:46:57,316 --> 01:47:00,896 I just wanted to state for the record that they are a part of the overall record. 2049 01:47:01,656 --> 01:47:02,096 Thank you. 2050 01:47:02,126 --> 01:47:02,776 Sorry about that. 2051 01:47:02,916 --> 01:47:06,816 And I did get an opportunity to read those as well, and we 2052 01:47:06,856 --> 01:47:10,495 will bring those up into comments with the questions after 2053 01:47:11,616 --> 01:47:13,636 people in-house and through Zoom speak. 2054 01:47:13,936 --> 01:47:15,836 So with that, come on up sir. 2055 01:47:18,496 --> 01:47:19,516 Hi, my name is Larry. 2056 01:47:20,336 --> 01:47:24,076 My father owns the building at 80 Longfellow Street, 2057 01:47:24,676 --> 01:47:27,836 and we just wanted to draw to your guys' attention, in case, 2058 01:47:28,876 --> 01:47:32,376 there's been a lot of history as far as that back 2059 01:47:32,496 --> 01:47:36,016 road, kind of right to the side of that huge slope. 2060 01:47:36,396 --> 01:47:40,206 We've had to spend a lot of money over the years on 2061 01:47:40,336 --> 01:47:44,056 drainage. Last year we had to spend a ton of money on drainage 2062 01:47:44,116 --> 01:47:48,076 because that whole back road really started 2063 01:47:48,085 --> 01:47:51,686 to deteriorate over the years, mainly because of the water that would come down 2064 01:47:51,756 --> 01:47:55,506 that slope. So his main concern and ours 2065 01:47:55,816 --> 01:47:58,916 was just that maybe some sort of drainage 2066 01:47:59,696 --> 01:48:02,796 solution there would be one, maybe that doesn't put so much 2067 01:48:02,896 --> 01:48:05,096 strain on our system. 2068 01:48:06,496 --> 01:48:09,736 Also how close it is is a concern, 2069 01:48:10,536 --> 01:48:11,956 because of the drainage also. 2070 01:48:13,896 --> 01:48:17,476 Like you said, it does seem to be like a small little 2071 01:48:17,486 --> 01:48:18,776 area there. 2072 01:48:19,716 --> 01:48:23,496 Not only is he concerned about it being 2073 01:48:23,536 --> 01:48:24,876 so small 2074 01:48:26,476 --> 01:48:30,016 next to the slope, but he's also concerned it's an historical building. 2075 01:48:30,696 --> 01:48:32,616 He just wanted to make sure preserve. 2076 01:48:34,696 --> 01:48:38,556 If you're just gonna squeeze a single building in there, just 2077 01:48:38,596 --> 01:48:42,436 because you can, it seems unfortunate to ruin such a 2078 01:48:42,476 --> 01:48:45,436 nice looking building right next to it, potentially. 2079 01:48:45,476 --> 01:48:49,136 But mainly, it sounds like 2080 01:48:49,596 --> 01:48:52,936 the location of these buildings is his concern, 2081 01:48:53,196 --> 01:48:56,486 specifically where they might be and how the drainage would work 2082 01:48:57,016 --> 01:48:57,396 getting 2083 01:48:59,136 --> 01:49:00,116 down that slope, 2084 01:49:00,936 --> 01:49:04,876 because we're basically downhill from everything up 2085 01:49:04,936 --> 01:49:05,216 there. 2086 01:49:06,876 --> 01:49:07,436 They've 2087 01:49:08,956 --> 01:49:12,676 developed kind of offsite in other places 2088 01:49:12,736 --> 01:49:16,306 where the water sometimes... The area is really, 2089 01:49:16,436 --> 01:49:20,316 there's a lot of water in that area. 2090 01:49:20,376 --> 01:49:24,326 So, we have pools of water on other parts of 2091 01:49:24,356 --> 01:49:27,236 our property because developments have kind of 2092 01:49:28,076 --> 01:49:30,516 pushed water down a hill on the other side of the property. 2093 01:49:30,596 --> 01:49:33,796 So I think we're just concerned that that sort of thing might happen 2094 01:49:34,476 --> 01:49:35,996 on the other side. So, 2095 01:49:37,136 --> 01:49:40,196 I don't know if he had anything to add. 2096 01:49:41,056 --> 01:49:41,656 No. Well, actually, 2097 01:49:43,456 --> 01:49:45,956 we have got that property- 2098 01:49:46,016 --> 01:49:46,316 Can you- 2099 01:49:46,366 --> 01:49:46,836 ... on all three sides. 2100 01:49:46,846 --> 01:49:48,346 Yeah, come on up. Give us your name and your address. 2101 01:49:48,346 --> 01:49:51,116 I'm Marshall Mack. I'm the owner of Mack Brothers. 2102 01:49:52,256 --> 01:49:56,096 We have a 90-unit early housing project that's on the 2103 01:49:56,116 --> 01:49:57,516 property around 2104 01:49:58,316 --> 01:50:00,836 108 Longfellow Street. And 2105 01:50:02,076 --> 01:50:05,096 that our back road there was actually the canal 2106 01:50:06,896 --> 01:50:10,576 that goes around and it's a high water table, the whole 2107 01:50:10,616 --> 01:50:14,376 area down below. So it's a concern to 2108 01:50:15,856 --> 01:50:19,416 how that's gonna play out if there's construction there. 2109 01:50:19,456 --> 01:50:23,436 And I can visualize in that little area a 2110 01:50:23,476 --> 01:50:24,716 house being there, but 2111 01:50:25,716 --> 01:50:26,276 that's not 2112 01:50:28,996 --> 01:50:32,436 something for me to decide. Also I suppose 2113 01:50:33,156 --> 01:50:34,456 the back part of it too, 2114 01:50:36,696 --> 01:50:39,656 we as a slope, but nothing like that one. 2115 01:50:39,726 --> 01:50:40,856 But we got a 2116 01:50:41,956 --> 01:50:42,376 single 2117 01:50:43,876 --> 01:50:47,316 apartment building on one floor that's on a slab, 2118 01:50:47,896 --> 01:50:51,696 and we have a drainage going around there too and I 2119 01:50:51,736 --> 01:50:52,336 don't know 2120 01:50:53,196 --> 01:50:56,356 how they're going to address more water coming down there 2121 01:50:57,616 --> 01:50:59,696 on that part of it. But as far as 2122 01:51:02,572 --> 01:51:06,272 Area three, I don't have a problem with that. 2123 01:51:07,372 --> 01:51:10,952 It's the back part of maybe area three, but area one 2124 01:51:11,072 --> 01:51:12,992 especially is a problem 2125 01:51:14,172 --> 01:51:14,912 for us. So, 2126 01:51:16,012 --> 01:51:17,192 that needs to be addressed. 2127 01:51:18,492 --> 01:51:18,632 But, 2128 01:51:19,992 --> 01:51:22,632 so that's all I want to say. 2129 01:51:22,762 --> 01:51:23,052 All right. 2130 01:51:23,312 --> 01:51:23,892 Thank you. 2131 01:51:24,032 --> 01:51:24,432 Thank you. 2132 01:51:26,932 --> 01:51:29,752 Could I clarify, Larry, is your last name Mack as well? 2133 01:51:29,832 --> 01:51:30,012 Yes. 2134 01:51:30,052 --> 01:51:30,272 Okay. 2135 01:51:30,452 --> 01:51:30,712 Yes. 2136 01:51:31,592 --> 01:51:35,032 I can hear a little bit better maybe. I think is the main thing. 2137 01:51:35,302 --> 01:51:35,772 Thank you. 2138 01:51:39,372 --> 01:51:41,812 Okay. Does anybody else from the public wish to speak? 2139 01:51:43,852 --> 01:51:46,152 Seeing none, anybody through Zoom, Orlando? 2140 01:51:47,892 --> 01:51:51,412 If there's anyone participating via Zoom and would like to speak, please raise your 2141 01:51:51,452 --> 01:51:51,732 hand. 2142 01:51:53,692 --> 01:51:54,392 I am seeing none. 2143 01:51:54,552 --> 01:51:56,772 Okay. With that, I'll close the public comment. 2144 01:51:59,092 --> 01:52:00,672 With that, do we have staff comment? 2145 01:52:04,032 --> 01:52:04,212 So- 2146 01:52:04,282 --> 01:52:04,752 Ms. Russ, please. 2147 01:52:04,912 --> 01:52:08,792 Yeah, well, it is a challenging thing because as Dustin said, he's 2148 01:52:08,832 --> 01:52:10,812 not proposing any development right now. 2149 01:52:11,192 --> 01:52:14,372 So this at this point really is just the land division. 2150 01:52:14,792 --> 01:52:18,692 Any kind of, the drainage design would be part 2151 01:52:18,792 --> 01:52:22,772 of any kind of development on these, but we don't have those 2152 01:52:22,852 --> 01:52:26,832 items now. The lot one, that would go through the process 2153 01:52:26,882 --> 01:52:30,532 called a surface drainage plan, which is something that's required to be reviewed, 2154 01:52:30,612 --> 01:52:33,712 where they do look at groundwater, and 2155 01:52:34,172 --> 01:52:38,042 where, essentially, whenever a new lot is created, that 2156 01:52:38,072 --> 01:52:41,762 lot legally needs to continue to accept the water. 2157 01:52:41,812 --> 01:52:45,642 It's always accepted, and it can't expel water onto a different property that it 2158 01:52:45,672 --> 01:52:46,512 didn't previously. 2159 01:52:47,402 --> 01:52:50,062 The existing paths of water have to be maintained. 2160 01:52:50,552 --> 01:52:54,462 So that's what the surface drainage plan would be looking at, that grading of that 2161 01:52:54,492 --> 01:52:56,752 lot before they could go forward to a building permit. 2162 01:52:57,532 --> 01:53:01,512 I do not disagree that the lot one that's being shown has a 2163 01:53:01,572 --> 01:53:05,392 very small building envelope between the slopes and then the 2164 01:53:06,332 --> 01:53:09,932 setbacks from the property lines that are being created, but it does 2165 01:53:10,272 --> 01:53:13,032 meet the requirements of the ordinance for a lot. 2166 01:53:13,912 --> 01:53:17,792 And then, as Dustin said, lot three would likely be some kind of a 2167 01:53:17,832 --> 01:53:21,772 site plan that would come back to this board and the grading and drainage would be 2168 01:53:21,792 --> 01:53:22,732 designed at that time. 2169 01:53:24,292 --> 01:53:24,852 Thank you, Becca. 2170 01:53:26,252 --> 01:53:28,892 With that, do we have any other board comments? Oriana? 2171 01:53:29,872 --> 01:53:33,812 Becca, just so I can learn, where nothing is being proposed to 2172 01:53:34,292 --> 01:53:38,152 be built right now, aside from the lots meeting the minimum 2173 01:53:38,212 --> 01:53:41,892 standards for the zoning district that they're in, is there 2174 01:53:41,952 --> 01:53:45,532 anything that the board... Like, there are no discretionary factors for us 2175 01:53:45,612 --> 01:53:48,522 to... Are there any discretionary factors- ... 2176 01:53:48,552 --> 01:53:52,152 that we would evaluate to disapprove this 2177 01:53:52,212 --> 01:53:52,892 subdivision? 2178 01:53:53,952 --> 01:53:57,892 Not typically. The only thing that kind of flagged for me that I do wanna run by 2179 01:53:57,992 --> 01:54:01,372 afterwards is making sure that there's a location for a driveway that would be 2180 01:54:01,392 --> 01:54:02,822 feasible on that lot one. 2181 01:54:03,712 --> 01:54:07,452 Because, there have been instances where people have created lots that were not 2182 01:54:07,472 --> 01:54:10,212 board approved, they just carved off a lot, and then come to find out that lot 2183 01:54:10,252 --> 01:54:12,772 doesn't meet the standards for a driveway. That could be a problem. 2184 01:54:13,212 --> 01:54:16,732 But essentially, it is just a review of the lot dimensions, yes. 2185 01:54:16,792 --> 01:54:19,812 Yeah, okay. I note that it is the minimum 2186 01:54:20,792 --> 01:54:24,092 size, but it can be for fronted 65 feet 2187 01:54:24,452 --> 01:54:24,832 across. 2188 01:54:25,132 --> 01:54:25,402 And depth. 2189 01:54:26,772 --> 01:54:26,892 Yeah. 2190 01:54:27,232 --> 01:54:28,772 So it meets the criteria to the T. 2191 01:54:31,492 --> 01:54:33,072 Thank you, Oriana. Anybody else? 2192 01:54:33,572 --> 01:54:34,172 All right, Mr. Chair. 2193 01:54:34,232 --> 01:54:34,492 John? 2194 01:54:34,872 --> 01:54:38,612 So I actually live on Turner Street, and I've actually been to this 2195 01:54:38,632 --> 01:54:40,732 building, and that that is a steep slope. 2196 01:54:40,932 --> 01:54:40,942 Yes. 2197 01:54:40,972 --> 01:54:44,132 So but that's not before us today. That's for someone who's gonna have to go 2198 01:54:44,172 --> 01:54:45,252 through to get a building permit. 2199 01:54:46,992 --> 01:54:48,692 And it would need a curb cut as well, wouldn't it? 2200 01:54:49,172 --> 01:54:52,312 Yep, that was the driveway point that I'm kind of flagging to double check. 2201 01:54:52,322 --> 01:54:52,792 Yeah, well, that's- 2202 01:54:52,852 --> 01:54:56,732 I think it will be fine because what the entrance to the property next door is 2203 01:54:56,972 --> 01:55:00,962 like a private access entrance. It's not a street, but with the slope where 2204 01:55:01,012 --> 01:55:03,392 it is, those driveways would have to be pretty close to each other. 2205 01:55:03,452 --> 01:55:04,952 So I wanna run that by the city engineer. 2206 01:55:05,212 --> 01:55:09,102 Sure. Okay. All right. Other than that, I mean, that, as we've 2207 01:55:09,132 --> 01:55:12,952 all said, and Oriana underscored, we're just splitting it up into three legal 2208 01:55:12,992 --> 01:55:13,592 lots, so 2209 01:55:14,712 --> 01:55:15,592 I think that's where we're at. 2210 01:55:17,332 --> 01:55:21,152 Yes, thank you. And with a lot one with a single family, 2211 01:55:21,372 --> 01:55:24,422 it's not coming back to the board because we only 2212 01:55:24,422 --> 01:55:27,732 see items that have a multi-family. 2213 01:55:27,912 --> 01:55:31,592 So if there's three or more buildings proposed on any lot, 2214 01:55:32,372 --> 01:55:34,352 that's when it comes to the board approval. 2215 01:55:34,872 --> 01:55:38,772 If it's a single family lot, like this one, the one that's 2216 01:55:38,812 --> 01:55:40,052 mostly concerned 2217 01:55:40,972 --> 01:55:44,372 with the residents here, is gonna be directly going through 2218 01:55:45,032 --> 01:55:48,532 the city, through code enforcement, through the whole 2219 01:55:48,612 --> 01:55:51,952 application process. If it gets sold off, 2220 01:55:52,752 --> 01:55:56,392 then the city actually will take responsibility to make 2221 01:55:56,452 --> 01:55:59,752 sure that the water will not run off onto other 2222 01:55:59,772 --> 01:56:03,282 parcels of property. When we have a multi-structure, 2223 01:56:03,832 --> 01:56:07,792 we make sure that we put in places certain drainage issues 2224 01:56:07,872 --> 01:56:09,172 on any multi, and 2225 01:56:10,252 --> 01:56:13,992 it's being taken care of. So there's no extra runoff. 2226 01:56:14,572 --> 01:56:18,352 Anything that I've seen in the last seven years with any of the projects that does 2227 01:56:18,392 --> 01:56:22,112 come through with my understanding is, we 2228 01:56:22,152 --> 01:56:26,072 follow up on all this, and if there is extra water, the builder 2229 01:56:26,112 --> 01:56:27,852 is responsible to taking care of that. 2230 01:56:27,912 --> 01:56:29,352 So it's gonna be 2231 01:56:30,632 --> 01:56:34,212 something that will be addressed when it comes time to build. 2232 01:56:34,892 --> 01:56:38,292 And if it does get sold, I don't know, does that just go directly to... 2233 01:56:38,492 --> 01:56:39,732 The abutters won't have any 2234 01:56:40,892 --> 01:56:44,212 say if a single building goes into play there. Was that correct? 2235 01:56:45,212 --> 01:56:48,572 Notices are sent out to direct abutters for a building permit 2236 01:56:48,672 --> 01:56:51,412 issuance, but it's a notification. 2237 01:56:51,492 --> 01:56:52,952 It's not a review period. 2238 01:56:53,072 --> 01:56:56,392 Okay. Yeah. So it'll go through the city on that. 2239 01:56:56,482 --> 01:57:00,032 So you will get notified if somebody does buy this lot anyway. 2240 01:57:00,112 --> 01:57:03,932 So you'll have some kind of understanding to know in what and who is gonna 2241 01:57:03,972 --> 01:57:07,912 buy it before it does get built. So just keep an eye out on that 2242 01:57:07,972 --> 01:57:11,942 if you see a for sale sign, and keep in contact with the city as far as 2243 01:57:11,972 --> 01:57:12,832 that drainage goes. 2244 01:57:13,772 --> 01:57:16,052 One other mention that I have on here is the knotweed. 2245 01:57:16,652 --> 01:57:17,192 I know it's not 2246 01:57:18,972 --> 01:57:21,112 part of this project now, if we're not going to disturb it. 2247 01:57:21,172 --> 01:57:23,772 But as far as the record goes, I'll bring it up because 2248 01:57:24,912 --> 01:57:28,462 Joanne Calderbank sent us an email, and I just want to bring it up to attention. 2249 01:57:28,532 --> 01:57:30,422 It's an invasive species of weeds. 2250 01:57:31,192 --> 01:57:34,912 Once it gets moved, and just like the spores go everywhere, it's challenging. 2251 01:57:34,952 --> 01:57:38,432 So she's concerned with that development of that parcel 2252 01:57:39,092 --> 01:57:43,012 with that amount of knotweed that was already taken down once, how it came back 2253 01:57:43,472 --> 01:57:46,832 tenfold. Same thing with bamboo. It's going to keep coming back, and it 2254 01:57:47,352 --> 01:57:49,972 spreads pretty quick. So that was her concern. 2255 01:57:50,052 --> 01:57:53,912 I know we're not developing it right now, but again, it's something down the road 2256 01:57:53,972 --> 01:57:54,332 on that. 2257 01:57:56,232 --> 01:57:58,172 Other than that, then thank you. Anybody? Go ahead. 2258 01:57:58,212 --> 01:58:01,152 Just one last thing, Mr. Chair. To the Max, thank you for sending this picture. 2259 01:58:01,232 --> 01:58:03,371 It's wonderful to see how it used to be. 2260 01:58:03,412 --> 01:58:06,332 My kids were so intrigued that parts of the canal are still there- 2261 01:58:06,532 --> 01:58:06,652 Oh, yeah 2262 01:58:06,662 --> 01:58:07,752 ... on the back of your lot. 2263 01:58:08,842 --> 01:58:08,842 Yeah. 2264 01:58:08,872 --> 01:58:09,172 Thank you. 2265 01:58:09,552 --> 01:58:11,671 Yeah, well, you showed me that all excited, too. 2266 01:58:13,512 --> 01:58:16,692 But yeah, it sounds like you guys know that that's going to be slow. 2267 01:58:17,012 --> 01:58:17,272 Yes. 2268 01:58:17,332 --> 01:58:18,812 That's all we wanted you guys to... 2269 01:58:19,592 --> 01:58:23,572 Yeah, it'll be addressed for sure for water concerns, especially once the 2270 01:58:23,612 --> 01:58:26,832 lot gets drawn off and where they can build them and so forth from that. 2271 01:58:29,032 --> 01:58:29,682 But thank you for your- 2272 01:58:30,252 --> 01:58:32,272 I can deal with that kind of speed, I swear. 2273 01:58:33,032 --> 01:58:33,412 Right? 2274 01:58:34,292 --> 01:58:35,912 I was wondering when you were going to crack one. 2275 01:58:38,262 --> 01:58:39,812 Hey, I got a question. 2276 01:58:39,852 --> 01:58:40,612 Oh, go ahead, Jason. 2277 01:58:40,952 --> 01:58:42,492 Yeah, I got a question for Rebecca. 2278 01:58:42,592 --> 01:58:44,152 So other than single family 2279 01:58:45,092 --> 01:58:48,022 homes, what else could be built there with the zoning? 2280 01:58:50,672 --> 01:58:51,972 With the zoning? 2281 01:58:52,032 --> 01:58:52,112 Yeah. 2282 01:58:52,672 --> 01:58:52,842 Well, 2283 01:58:53,972 --> 01:58:57,872 any of the permitted uses in the zoning district could go there, but they'd have to 2284 01:58:57,932 --> 01:58:58,212 meet 2285 01:58:59,452 --> 01:59:02,952 the standards of the lot, and given the building envelope, it would be pretty 2286 01:59:03,092 --> 01:59:04,812 tough to achieve that. 2287 01:59:05,892 --> 01:59:06,272 Anything 2288 01:59:08,652 --> 01:59:12,522 that's not a single family home that is more than 2289 01:59:12,672 --> 01:59:16,611 3,000 square feet of impervious would be back before the board as a site plan. 2290 01:59:17,512 --> 01:59:20,192 But it's the list of permitted uses in the zoning districts. 2291 01:59:21,612 --> 01:59:21,852 There are- 2292 01:59:22,792 --> 01:59:23,672 It's RGA1. 2293 01:59:24,432 --> 01:59:25,832 Would you like to run- 2294 01:59:26,012 --> 01:59:26,022 There's a lot. 2295 01:59:26,052 --> 01:59:29,872 Yeah, there's quite a few, but most of them would not be feasible 2296 01:59:29,992 --> 01:59:30,972 on that size lot. 2297 01:59:31,612 --> 01:59:32,742 Cemetery, bed and breakfast. 2298 01:59:32,772 --> 01:59:35,072 But technically, yes, any of those. 2299 01:59:38,112 --> 01:59:39,032 Any other board members? 2300 01:59:39,532 --> 01:59:39,912 Thank you. 2301 01:59:41,762 --> 01:59:43,212 Thank you. Okay. Well, thank you, Dustin. 2302 01:59:43,252 --> 01:59:43,832 All right, thank you. 2303 01:59:43,841 --> 01:59:44,412 With that, the meeting is adjourned. 2304 01:59:45,752 --> 01:59:47,211 Thank you all.