1 00:00:01,240 --> 00:00:10,800 being into quadrants. Then I'm going to talk about the program and policy 2 00:00:06,960 --> 00:00:14,960 portion of the requirements. uh address public 3 00:00:11,800 --> 00:00:19,920 feedback, talk about uh how to treat existing sites, and then talk about the 4 00:00:18,080 --> 00:00:25,519 the key deliverable, the transition plan, and then make some comments about 5 00:00:22,640 --> 00:00:32,039 reporting that will occur between now and when the project ends in September 6 00:00:28,720 --> 00:00:32,039 of 2026. 7 00:00:46,559 --> 00:00:53,920 All right. Can you advance it? Yeah. All right. You might be able to work now, 8 00:00:50,960 --> 00:00:59,000 too. Right. But quickly, what is the ADA? It became effective actually quite 9 00:00:56,160 --> 00:01:05,159 a ways back. January 26th of 1992 for the 89,000 units of local 10 00:01:02,160 --> 00:01:08,920 government across the United States. Obviously, it prohibits 11 00:01:07,119 --> 00:01:13,119 discrimination on the basis of disability, but it defines 12 00:01:10,960 --> 00:01:17,200 discrimination in a way that might surprise you. It says that an existing 13 00:01:15,280 --> 00:01:21,240 site that's not accessible is discrimination on the basis of 14 00:01:18,560 --> 00:01:26,560 disability. uh it says that programs and policies that are not inclusive of 15 00:01:23,600 --> 00:01:30,960 people who have a disability uh rise to the level of discrimination on the basis 16 00:01:28,320 --> 00:01:35,200 of disability. So those are all parts of the scope here and because the scope of 17 00:01:33,520 --> 00:01:39,640 the ADA is so broad I think appropriately so the Westcog project 18 00:01:37,520 --> 00:01:44,880 scope is broad as well. The ADA doesn't just tell you you 19 00:01:43,200 --> 00:01:49,200 can't do certain things though it also imposes some very affirmative mandates. 20 00:01:47,520 --> 00:01:54,479 Those two have been worked into the scope and I'll touch on those too. Just 21 00:01:52,240 --> 00:02:00,479 a comment about things in Washington DC. This is not a political comment. Uh we 22 00:01:57,840 --> 00:02:05,920 see this thick political approach no matter who is elected from which party. 23 00:02:03,680 --> 00:02:10,080 There's generally when there's a Republican elected as president, there 24 00:02:07,680 --> 00:02:16,080 are fewer civil rights staff. It's happened every year for the last 33 25 00:02:11,840 --> 00:02:20,560 years. So we expect as much as a 50% cut in civil rights staff, but that's not 26 00:02:18,879 --> 00:02:24,480 going to change the content. When this has happened in the past, the content of 27 00:02:23,120 --> 00:02:30,239 settlement agreements and court decisions has remained exactly the same. 28 00:02:27,840 --> 00:02:34,640 But we do think there will be an impact because there will simply be fewer 29 00:02:32,080 --> 00:02:40,800 Department of Justice staff to receive complaints and investigate complaints. 30 00:02:38,120 --> 00:02:46,879 Um, we are still seeing a continued trend from towns and cities and special 31 00:02:44,480 --> 00:02:54,239 purpose districts of issuing RFPs for ADA compliance. So, 33 years into the 32 00:02:50,959 --> 00:02:58,160 life of this law and agencies are still realizing that they want to do this and 33 00:02:56,480 --> 00:03:03,360 need to do it in part because of the changing demographic groups. 34 00:03:00,640 --> 00:03:09,040 Uh our firm is an architectural and engineering firm but we added access 35 00:03:05,120 --> 00:03:15,360 consulting in 2008. Uh we work all over the country and are licensed in all 50 36 00:03:11,959 --> 00:03:20,080 states and we serve just about everybody. We are an MBE uh in 37 00:03:18,080 --> 00:03:25,760 collaboration with our partner Draft Pros and we have about 340 nationwide. 38 00:03:23,760 --> 00:03:31,680 our accessibility practice of just the nine of us and unique to other ADA 39 00:03:29,720 --> 00:03:37,120 consultants. Seven of the nine of us worked in local government and I had the 40 00:03:34,080 --> 00:03:37,120 pleasure of being an 41 00:03:37,319 --> 00:03:46,120 administrator. Um so what is the quad approach? 42 00:03:42,120 --> 00:03:51,519 So there is no way to do all 16 of the participating uh Westco communities at 43 00:03:48,640 --> 00:03:57,360 once. We did briefly consider that, but that was just not going to be effective. 44 00:03:54,239 --> 00:04:02,959 So, we tried to balance that by putting you into groups of four. The scope of 45 00:04:00,799 --> 00:04:06,480 work for all 16 is the same though. Project management, inventory 46 00:04:04,560 --> 00:04:12,879 verification, access audit, site reports, program policy review, public 47 00:04:09,920 --> 00:04:18,479 feedback, uh transition plan, a capital report that gives you a cost reference 48 00:04:15,519 --> 00:04:23,199 for planning purposes about direct. And then of course interactive final 49 00:04:20,479 --> 00:04:26,759 reporting and we're going to do that on the quad 50 00:04:25,080 --> 00:04:31,919 basis. Um we tried to balance the quads by 51 00:04:29,600 --> 00:04:37,199 population, proximity, number of parks, trails, and facilities. I'd say we hit a 52 00:04:34,639 --> 00:04:42,440 home run on a couple of them and maybe missed on a couple of others. Uh but it 53 00:04:40,080 --> 00:04:48,720 is still working. Quad one started with Darien, Reading, New Milford, and 54 00:04:45,639 --> 00:04:54,000 Norwok. Uh that's going to last roughly September of last year through July of 55 00:04:51,120 --> 00:04:59,919 this year. Quad two is Stanford. In fact, we have a team in Stamford this 56 00:04:56,080 --> 00:05:03,000 week, Westport, Weston, and Wilton. That's going to run through roughly 57 00:05:01,520 --> 00:05:09,280 August of 2025. Um we do expect some overlap 58 00:05:09,720 --> 00:05:14,199 here. It went back 59 00:05:17,039 --> 00:05:25,680 Try one more forward for me. Quad three is Bethl, Bridgewater, 60 00:05:23,199 --> 00:05:30,080 Greenwich, and New Town. And then quad four is Danbury, Brookfield, New 61 00:05:27,520 --> 00:05:33,560 Fairfield, and Sherman. And we expect that to take us roughly through August 62 00:05:31,919 --> 00:05:39,039 of 2026. We're also including reporting to 63 00:05:36,400 --> 00:05:42,080 Westcod on a periodic basis. And then of course that the project 64 00:05:42,199 --> 00:05:48,400 includes I think when a lot of people hear the Americans with Disabilities Act 65 00:05:46,320 --> 00:05:53,120 they think brick and mortar and that certainly is a piece of it but this is 66 00:05:50,240 --> 00:05:57,919 really an important part uh programs and policies or opportunities that each of 67 00:05:55,919 --> 00:06:01,880 the municipalities makes available to your 68 00:05:58,680 --> 00:06:06,400 residents are also subject to the API. So programs are defined of course as a 69 00:06:04,720 --> 00:06:11,120 thing that meets at a certain time that I say it before and it been a certain 70 00:06:08,800 --> 00:06:15,440 location and it lasts for eight weeks. But it's also a sidewalk that's been 71 00:06:12,960 --> 00:06:19,600 decided by a court as a program. Uh it's also playgrounds, trails, beaches, 72 00:06:17,280 --> 00:06:26,080 campsites, public comment at one of your board meetings. So that's why the scope 73 00:06:23,840 --> 00:06:31,120 includes evaluating your programs and policies and talking to your staff about 74 00:06:28,479 --> 00:06:35,319 how they invite uh analyze and fulfill requests for 75 00:06:34,000 --> 00:06:39,080 reasonable modification. From a policy perspective, 76 00:06:37,600 --> 00:06:44,319 we'll look at things like service animals, other powerdriven mobility 77 00:06:41,520 --> 00:06:49,039 devices, uh rental and reservation forms, and so forth. But this is a 78 00:06:46,880 --> 00:06:54,160 really important piece. It ends up in a separate report that 79 00:06:51,120 --> 00:06:58,800 talks about how you matched up against the title two regulation. Uh so again, I 80 00:06:57,199 --> 00:07:03,440 think a lot of people think of brick and mortar first when they hear ADA. You 81 00:07:01,199 --> 00:07:07,680 know, I would urge you to greenlight this for your staff. We've had a couple 82 00:07:05,039 --> 00:07:12,479 of staff ask us, is this really a part of the scope? And of course, it is. It's 83 00:07:09,759 --> 00:07:17,599 part of what title two requires and it's part of uh the Westcog project. 84 00:07:15,919 --> 00:07:23,039 Community engagement is another piece. So I'll call these two the sets of soft 85 00:07:20,479 --> 00:07:27,759 tasks involved here. You can't have a transition plan without community 86 00:07:24,800 --> 00:07:34,800 engagement or public feedback. So this is a really critical uh piece of this 87 00:07:30,919 --> 00:07:39,919 and as we go through and I'll use town of reading as an example. We just did 88 00:07:36,720 --> 00:07:45,440 their community engagement March 3rd 4th I think it was. And the point of it is 89 00:07:43,000 --> 00:07:51,520 to ask your residents who have a disability, do you have a preference or 90 00:07:48,199 --> 00:07:55,919 priority as to the order of retrofit? Um, and is it something that is 91 00:07:54,240 --> 00:08:00,879 meaningful to you? Because that can influence our final recommendations to 92 00:07:58,080 --> 00:08:05,840 the town or to the city. We recognize that each city, each municipality is 93 00:08:03,199 --> 00:08:11,560 different. So you'll get in Sherman a different report than uh petal will and 94 00:08:09,840 --> 00:08:20,240 bridge water will want to kind of tie your own 95 00:08:15,879 --> 00:08:24,319 citizens preferences into that. So again I ask you to greenlight that too. We've 96 00:08:22,479 --> 00:08:29,120 had a couple of times where staff have said is this really a part of the 97 00:08:25,680 --> 00:08:33,680 project and indeed it is. We do public feedback in two different methods. One 98 00:08:31,039 --> 00:08:39,120 is an in-person freestanding meeting. Since the pandemic, candidly, we I'm 99 00:08:37,039 --> 00:08:44,560 surprised if we get 10 people to show up at an in-person meeting. These tend to 100 00:08:41,680 --> 00:08:49,279 be fairly positive in nature. Wouldn't you agree? Yeah, I would agree. I mean, 101 00:08:47,200 --> 00:08:55,279 it's it's been a positive process for lessian so far. There's no great same 102 00:08:52,720 --> 00:09:00,240 with us in writing. Absolutely. Really consistent with the process with the 103 00:08:57,760 --> 00:09:03,760 public outreach. I learned a lot even that you know I think you've warned us 104 00:09:01,920 --> 00:09:07,519 you may not get a lot of people at these in public sessions but the feedback that 105 00:09:05,839 --> 00:09:12,880 you did get was really insightful and invaluable I felt so plus the second 106 00:09:10,240 --> 00:09:17,680 piece is the the online survey that we did and kind of reading has almost as 107 00:09:15,360 --> 00:09:24,160 many responses as we got from the entire state of Texas on a related project but 108 00:09:20,640 --> 00:09:29,640 we're calling reading Texas don't mess with us 109 00:09:27,279 --> 00:09:34,880 um so what's an exist existing site. Pretty silly distinction here, but 110 00:09:33,440 --> 00:09:41,279 it's anything that was designed and constructed after January 26 of 1992, 111 00:09:38,240 --> 00:09:47,040 that's subject to the 1991 standards. And then if it was uh designed and 112 00:09:43,680 --> 00:09:53,360 constructed after March 15 of 2012, then it's subject to the 2010 standards. U 113 00:09:50,399 --> 00:09:59,519 the 1991 standards just included typical built environment assets like parking as 114 00:09:55,760 --> 00:10:04,560 doors and restrooms. The 2010 standards added park assets, uh, playgrounds, 115 00:10:02,800 --> 00:10:08,200 sports fields, things, basketball courts, pickle ball courts, skate parks, 116 00:10:06,399 --> 00:10:14,480 and so forth. Um, you've got pickle ballers out there 117 00:10:10,640 --> 00:10:18,560 playing today in the drizzle. Uh, it's important to to know the rag and the 118 00:10:17,120 --> 00:10:24,760 standards though, so that you can stay in the driver's seat. If you wind up in 119 00:10:22,079 --> 00:10:30,000 a settlement agreement or being compelled to compliance, you have to do 120 00:10:28,000 --> 00:10:33,920 everything in three years. If you stay in the driver's seat, you can stretch 121 00:10:32,399 --> 00:10:40,279 that out over a period of time that matches your resources and still meets 122 00:10:37,480 --> 00:10:47,200 semantic. Um, what's a transition plan? Pretty 123 00:10:44,079 --> 00:10:53,440 simply put, it's a it's a phased schedule of retrofit. It has to identify 124 00:10:49,600 --> 00:10:57,640 every deficit. So your site reports and the transition plan may be long if 125 00:10:55,760 --> 00:11:01,760 especially if you're a larger municipality. Uh has to recommend a 126 00:10:59,920 --> 00:11:08,000 solution or a treatment for each deficit and that can include leave it as is till 127 00:11:04,800 --> 00:11:12,399 it's later replaced or altered. U you have to identify the position 128 00:11:09,519 --> 00:11:16,959 responsible for the transition plan. So, director of public works or ADA 129 00:11:14,240 --> 00:11:21,760 coordinator or whomever you wish for that person to be. And then you have to 130 00:11:19,440 --> 00:11:26,959 note by when the work will occur. We typically recommend that this occur in 131 00:11:24,000 --> 00:11:31,360 phases with each phase varying from three to as many as five years depending 132 00:11:29,519 --> 00:11:36,160 on the number of deficits that you have and the number of resources that you 133 00:11:33,440 --> 00:11:40,079 have. Uh we always add costs. That's not a requirement from the ADA, but we know 134 00:11:38,240 --> 00:11:46,320 that no municipality can make a plan like this uh without 135 00:11:42,680 --> 00:11:52,240 cost. So reporting and communication uh we want to do this 136 00:11:50,160 --> 00:11:58,959 uh we want to do this individually. So for each municipality as we near the end 137 00:11:55,279 --> 00:12:03,440 of the cycle for your project uh we will arrange for reports to your 138 00:12:01,839 --> 00:12:10,560 stakeholders. So whether that's staff leadership or governing board or both, 139 00:12:07,440 --> 00:12:15,839 um we're happy to do that. Uh at the end of the project, as I mentioned earlier, 140 00:12:13,200 --> 00:12:21,800 Westco will also receive a cumulative report that will kind of summarize what 141 00:12:18,320 --> 00:12:26,399 we saw for each of the 16. Um staff leadership piece is 142 00:12:24,160 --> 00:12:30,639 particularly important. All of you have designated somebody as the contact 143 00:12:28,160 --> 00:12:36,639 person for us and so we'll work with them to identify any others on staff 144 00:12:33,920 --> 00:12:45,800 that uh we need to participate. Couple of resources before you bombard me with 145 00:12:40,760 --> 00:12:51,920 questions. Um DOJ has a really good hotline. Um they do a good job of 146 00:12:49,399 --> 00:12:56,920 separating enforcement from technical assistance. So don't worry if you wind 147 00:12:54,160 --> 00:13:00,959 up calling the 202514301 number when you show up at 148 00:12:59,360 --> 00:13:06,000 work the next day. There's not going to be a bunch of people in suits from 149 00:13:02,880 --> 00:13:10,560 Washington DC. Uh they're great for program and policy question. If it's 150 00:13:08,320 --> 00:13:15,760 brick and mortar or dirt and grass or beaches, call the access board. They're 151 00:13:13,040 --> 00:13:20,480 the small federal agency that created the standards for design and 152 00:13:18,160 --> 00:13:26,000 construction of outdoor assets and park assets and buildings. They know this by 153 00:13:23,200 --> 00:13:30,720 far better than anybody else. And they've got a great technical assistance 154 00:13:27,760 --> 00:13:34,240 service, too. There is a national ADA network. They're happy to talk to you 155 00:13:32,320 --> 00:13:39,040 about anything, including employment, including uh universities, including uh 156 00:13:37,600 --> 00:13:45,680 things that we haven't even thought of. So, uh you can reach them at 800 157 00:13:42,680 --> 00:13:49,360 9494232. There are seven of those across the country. They all use the same phone 158 00:13:47,360 --> 00:13:52,160 number, and they're more clever than I am. they can figure out where you're 159 00:13:50,720 --> 00:14:00,720 calling from and they connect you to your local uh ADA uh assistance center. 160 00:13:56,560 --> 00:14:04,839 Um we love to talk about this. So sorry, I did two there. That's me. 161 00:14:05,519 --> 00:14:15,920 If if your team raises a question and you call Westcog or you want to reach 162 00:14:12,240 --> 00:14:21,880 out to us, feel free to do that. Um as I said, I lead the accessibility practice. 163 00:14:17,839 --> 00:14:27,199 Tatum is our master of logistics and information. Uh I will say we've had 164 00:14:25,360 --> 00:14:32,800 great working experience with the Westcock staff. Mike Wilson who I know 165 00:14:30,560 --> 00:14:36,959 is not here but I believe is he's on virtually. 166 00:14:34,639 --> 00:14:41,600 Hey Mike. Uh he has been great to work with. Uh if he doesn't know the question 167 00:14:39,040 --> 00:14:45,839 or the answer to the question uh he gets to us as soon as he can. So, and Chris 168 00:14:44,240 --> 00:14:51,199 has been a pleasure to work with and the occasional times that we see Francis, he 169 00:14:47,600 --> 00:14:56,480 too has been easy to work with. So, I'll back up not literally here on the 170 00:14:53,680 --> 00:15:03,399 screen, but can I answer questions from any of you about the project or uh 171 00:14:59,440 --> 00:15:03,399 anything related to compliance? 172 00:15:06,800 --> 00:15:15,199 Yes, I'm sorry. Okay. Um, how often do these plans need to be updated? That's a 173 00:15:13,040 --> 00:15:20,959 great question. U, the Title 2 regulation doesn't have a a date 174 00:15:18,480 --> 00:15:26,240 requirement for updates, but many accredititation programs. So in 175 00:15:23,199 --> 00:15:29,079 particular for parks and recreation, it's 176 00:15:27,240 --> 00:15:34,320 recommended actually it's not recommended for a municipal parks 177 00:15:32,320 --> 00:15:38,000 department to get the commission on accreditation of park and recreation 178 00:15:36,079 --> 00:15:43,079 agencies. They have to have a fresh transition plan every 10 years. From a 179 00:15:40,800 --> 00:15:48,800 smart practice perspective, that's probably about right. uh especially a 180 00:15:46,720 --> 00:15:53,240 community your size you're replacing things you're changing out playgrounds 181 00:15:51,199 --> 00:15:58,959 you're act you're acquiring something new you're raising something old so I 182 00:15:57,120 --> 00:16:05,279 think about once every 10 years makes sense so John with with this if you're 183 00:16:02,399 --> 00:16:09,680 going to do an update every decade or so would it make sense for municipality to 184 00:16:07,279 --> 00:16:15,120 have a log of improvements and changes they made in interim just to facilitate 185 00:16:11,759 --> 00:16:20,480 the update to the plan yes and so one of the things that we can do in the final 186 00:16:18,000 --> 00:16:26,240 deliverable is give you what we call task track factor. So it's Excel. I'm 187 00:16:24,240 --> 00:16:32,160 sure that somebody can convert it to a smart sheet or some other tool. Um so we 188 00:16:30,000 --> 00:16:36,639 we developed task tracker when we were working with a handful of communities 189 00:16:34,079 --> 00:16:40,800 that were under department of justice settlement agreement. So it has all the 190 00:16:38,720 --> 00:16:47,680 information that transition plan has. Then column K says 191 00:16:44,240 --> 00:16:53,480 uh playground replacement included in town budget January 1, 192 00:16:50,680 --> 00:16:59,519 2029. Uh bids let for playground replacement April 193 00:16:55,560 --> 00:17:07,280 2029. Uh playground installed June of 2029 and then playground inspected by 194 00:17:03,040 --> 00:17:12,160 name of town employee on August of 2029 and signed off as client. So, that's a 195 00:17:10,640 --> 00:17:16,240 great way for you to kind of keep track of here's the here's the literally 196 00:17:14,559 --> 00:17:20,240 thousands of projects that we would have done over the course of 10 years. And 197 00:17:18,799 --> 00:17:23,760 some of the projects aren't going to be brick and mortar. 198 00:17:22,240 --> 00:17:27,520 It's going to be making sure that garbage and recycling bins aren't stored 199 00:17:25,839 --> 00:17:31,840 by the door so that they block maneuvering clearance if I use a 200 00:17:29,559 --> 00:17:35,679 mobility. So, a lot of these are low hanging fruit things that you can do 201 00:17:33,440 --> 00:17:38,679 with current human and physical resources. 202 00:17:40,240 --> 00:17:43,240 others. 203 00:17:45,039 --> 00:17:56,120 I surrender the clicker. Okay, very good. Which I used. One other question. 204 00:17:51,880 --> 00:18:02,840 Um I'm kind of curious what happens when compliance is a a matter of 205 00:17:59,480 --> 00:18:08,000 judgment say along the continent that says full compliance in an extreme case, 206 00:18:06,080 --> 00:18:11,120 right? which would require either substantial remediation or design or 207 00:18:09,840 --> 00:18:15,840 actually just tearing everything down and starting over again. Say to describe 208 00:18:13,360 --> 00:18:18,799 hypothetical extreme versus something that gets close enough, right? In other 209 00:18:17,600 --> 00:18:24,320 words, there's an elevator on the far end of the building, but not one right 210 00:18:21,200 --> 00:18:29,919 here on this side of the at what point, how does that those types of cases where 211 00:18:26,960 --> 00:18:34,640 it's a maybe a judgment call as to just pouch far someone's got to go to comply 212 00:18:31,919 --> 00:18:39,919 with these regulations and how is that adjudicated and how can municipalities 213 00:18:36,640 --> 00:18:44,559 do a a better job in their own work to uh make sure they don't cross over say a 214 00:18:42,880 --> 00:18:49,120 line? That's that's a good question. There are 215 00:18:46,240 --> 00:18:57,520 a handful of places in the title 2 regulation where municipalities are 216 00:18:52,240 --> 00:19:03,520 given some discretion or where you can say that a circumstance exists that 217 00:19:00,080 --> 00:19:08,960 makes compliance technically feasible. Some of you have very hilly communities. 218 00:19:07,200 --> 00:19:12,320 So where you have naturally occurring steep terrain for example, if you have 219 00:19:10,880 --> 00:19:19,360 trails, it's going to be hard to make the trails meet the compliance slope. So 220 00:19:16,000 --> 00:19:24,240 that is a technical infeasibility issue. Uh there might be in the event and 221 00:19:22,720 --> 00:19:28,640 honestly candidly we don't see this very often but there might be an undue 222 00:19:26,080 --> 00:19:35,520 economic burden where the cost of a project that would retrofit an asset uh 223 00:19:32,559 --> 00:19:39,679 is so great that uh you can claim that it's an undue economic burden but you 224 00:19:37,679 --> 00:19:44,799 have to consider the entire fiscal resources of the jurisdiction before you 225 00:19:42,240 --> 00:19:48,600 do that. Uh there are some others too. So, I mentioned the soft task, the 226 00:19:46,320 --> 00:19:52,720 program and policy analysis. If you have a building that's 227 00:19:50,960 --> 00:19:55,440 not accessible, but you've got another building that is 228 00:19:55,480 --> 00:20:01,840 accessible, you might find yourself in a situation where you leave the building 229 00:19:59,280 --> 00:20:05,760 that's inaccessible as it is, but you take those same programs and duplicate 230 00:20:03,919 --> 00:20:09,919 them and offer them in the building that is accessible. There's nothing wrong 231 00:20:07,600 --> 00:20:13,000 with doing that either. Uh the Department of Justice has also in 232 00:20:11,840 --> 00:20:20,120 settlement agreements given jurisdiction one, two, 233 00:20:16,240 --> 00:20:25,200 three years to make an inaccessible site accessible. So we often find somebody 234 00:20:23,440 --> 00:20:30,080 has plans to build a new community center. The old community center is not 235 00:20:27,480 --> 00:20:34,880 accessible. It gets to continue to operate until the new one is constructed 236 00:20:32,480 --> 00:20:39,679 and open as long as it's within a three-year period. So there are some 237 00:20:37,600 --> 00:20:45,039 interpretive things like that. And I I should mention staff training. It wasn't 238 00:20:41,280 --> 00:20:53,280 one of the slides, but um we in our response to WCOG offered 239 00:20:48,520 --> 00:20:58,880 um to each quad two free staff frames. So one will be on infrastructure and it 240 00:20:55,440 --> 00:21:03,919 will review real life disputes and what the requirements are and the other will 241 00:21:01,039 --> 00:21:06,640 be on program and policy issues. So, we had originally thought that we would 242 00:21:05,200 --> 00:21:10,480 offer all those toward the end of the project. We're not going to do that. 243 00:21:08,400 --> 00:21:15,120 We're going to offer them as a part of each quad. So, sometime around the end 244 00:21:12,640 --> 00:21:19,840 of this first quad, we'll work with Westcog to schedule both a program and 245 00:21:18,080 --> 00:21:23,840 policy training and an infrastructure training and it'll address questions 246 00:21:21,440 --> 00:21:28,960 exactly like that. And you can feel free to go to the 247 00:21:26,799 --> 00:21:35,280 training that's for quad four or for quad one or go go go to all eight of 248 00:21:31,520 --> 00:21:41,200 them if your staff want to. Yes. Just in answer to John's question, we did uh 249 00:21:38,159 --> 00:21:47,039 have a complaint filed on parking. And what we ended up doing is measuring the 250 00:21:44,120 --> 00:21:51,360 slope of all of our parking places. The library had to repave an area in order 251 00:21:49,120 --> 00:21:57,039 to be in compliance and it wasn't off that much. 252 00:21:53,000 --> 00:22:03,360 Um, we had to restripe several areas and there's a conflict with uh DOJ in the 253 00:22:01,760 --> 00:22:08,640 state of Connecticut relative to the signs. Yes. Uh there's a federal sign 254 00:22:06,000 --> 00:22:12,880 and a state sign. And we had just ordered all the state signs thinking we 255 00:22:11,280 --> 00:22:17,120 were doing the right thing and they said no, they're not allowable. But 256 00:22:15,280 --> 00:22:21,679 apparently at the end they've allowed us to go with those until we replace them 257 00:22:19,200 --> 00:22:27,200 with the new federal. Yeah, there is that. The Connecticut sign is for those 258 00:22:24,480 --> 00:22:34,000 who haven't seen it, it's the more mobile looking racing figure 259 00:22:30,600 --> 00:22:40,799 icon. The the argument from the DOJ side is that that standard sitting icon has 260 00:22:37,840 --> 00:22:45,600 been around for 45 50 years and it's recognized by everybody. So why why mess 261 00:22:43,919 --> 00:22:48,960 with something that everybody knows what it looks like? It's kind of like 262 00:22:47,039 --> 00:22:53,200 changing the logo for Coca-Cola, I guess, for exit signs in Connecticut. 263 00:22:50,880 --> 00:22:59,440 Exactly. Well, I'll take your word for that. Um, we would lean 264 00:22:56,919 --> 00:23:05,039 towards the Connecticut sign as being more stringent because it's different 265 00:23:01,679 --> 00:23:09,200 than the federal sign, but I'm not the Department of Justice, but we would lean 266 00:23:07,280 --> 00:23:15,280 towards that. We've seen signs like that. We've seen different size striping 267 00:23:12,400 --> 00:23:18,480 for accessible parking. So that's a a key part of this too. You have to meet 268 00:23:16,720 --> 00:23:25,039 whichever is more stringent the federal requirement for the the and it's been 269 00:23:21,120 --> 00:23:30,080 two years and just now our attorney sent hopefully is the final agreement back 270 00:23:27,360 --> 00:23:33,760 that we owe J. Yeah. Can you have both I mean it seems silly but can you have 271 00:23:31,600 --> 00:23:39,280 both federal and state signage? You can but I don't I don't think you'd want in 272 00:23:36,640 --> 00:23:42,640 the same spot. I'm not saying I want any issue right now. I also don't want 273 00:23:40,400 --> 00:23:46,320 people getting sued. Right. I am also don't want people with suits and guns 274 00:23:44,080 --> 00:23:51,760 showing up. So, well, just it's not that bad. You know, relief under the ADA is 275 00:23:49,280 --> 00:23:56,559 injunctive in nature. So, if you put up the the racing icon sign for parking and 276 00:23:55,039 --> 00:23:59,600 somebody does file a complaint, the worst that's going to happen is that 277 00:23:57,679 --> 00:24:04,480 you're going to be told to replace it with the I'm standing still in my 278 00:24:02,320 --> 00:24:08,720 wheelchair sign until the state of Connecticut shows up and says, "Where is 279 00:24:06,240 --> 00:24:14,960 the racing sign?" Yes. John, I'm wondering how you 280 00:24:12,080 --> 00:24:21,279 selected the grouping towns because for instance our two towns are the tiny 281 00:24:17,640 --> 00:24:25,760 towns where stride New Milford why wouldn't we all be in the same spot I I 282 00:24:23,760 --> 00:24:32,000 know and I' I've driven through both on the way to New Milford 283 00:24:27,960 --> 00:24:38,480 um some of it was readiness um if we had a complete site list from New Milford 284 00:24:34,480 --> 00:24:42,480 then that elevated them to quad one u I think we are still lacking I'm looking 285 00:24:40,640 --> 00:24:46,559 for uh I think we're still lacking a couple 286 00:24:44,080 --> 00:24:53,159 of site list but that's fine there's another 18 months of project so that 287 00:24:49,440 --> 00:24:53,159 would factor as well 288 00:24:54,919 --> 00:25:04,159 others just there's no state of Connecticut DOJ right I don't believe 289 00:25:02,000 --> 00:25:08,960 are that enforcing yeah I don't I don't believe so there is a Connecticut human 290 00:25:05,840 --> 00:25:14,080 rights act um and some states like Illinois where we are headquarters 291 00:25:11,520 --> 00:25:20,400 uh the attorney general's office does have a disability rights bureau and they 292 00:25:16,640 --> 00:25:25,039 do go out and enforce Illinois requirements as well as the ADA 293 00:25:22,799 --> 00:25:31,360 requirements too. The final question I have is when we do a capital project are 294 00:25:28,159 --> 00:25:36,840 we in fact required to allocate 20% of that cap capital project to ADA 295 00:25:34,000 --> 00:25:43,480 compliance? So that's a good question. One of the crystal clear 296 00:25:39,200 --> 00:25:49,360 pieces of the ADA is that if it is new construction, it must be fully 297 00:25:46,520 --> 00:25:53,600 compliant. But if it is an alteration or let's say it's an addition to this 298 00:25:51,080 --> 00:25:56,919 building, if there's an addition to this building, then the addition must be 299 00:25:55,919 --> 00:26:04,799 fully compliant, then 300 00:25:59,559 --> 00:26:10,480 20% is allocated to the path of travel. So, think like you're a wheelchair user. 301 00:26:08,559 --> 00:26:13,679 Path of travel starts as you're pulling into the parking lot. So, I've got to 302 00:26:12,080 --> 00:26:17,679 have accessible parking. There's got to be accessible signage. I've got to be 303 00:26:15,919 --> 00:26:21,360 able to get to the door on a slope that doesn't exceed 5%. There's got to be a 304 00:26:19,440 --> 00:26:25,440 level landing there. The door's got to open with less than 8.5 pounds of force. 305 00:26:23,919 --> 00:26:30,480 I've got to be able to get in there, maneuver through the hallway, find this 306 00:26:28,640 --> 00:26:37,279 door, open it with less than five pounds of force. So all of that could add up to 307 00:26:34,320 --> 00:26:43,039 the 20% depending on the type of addition that you're using. So I would 308 00:26:40,559 --> 00:26:46,200 say the answer to your question is no, unless it's an addition or an 309 00:26:44,400 --> 00:26:49,919 alteration. But if it's new construction, it's going to be fully 310 00:26:48,000 --> 00:26:53,200 compliant. And I will guarantee you that for some of you who have new 311 00:26:51,120 --> 00:26:59,200 construction, we will find things that are not compliant. Access is a function 312 00:26:55,960 --> 00:27:02,640 of did the designer get it right? Did the contractor get it right? then you 313 00:27:00,960 --> 00:27:07,600 know darn well that the interface between design and construction is never 314 00:27:04,480 --> 00:27:13,039 perfect. And then are your own team maintaining the asset correctly? So all 315 00:27:11,279 --> 00:27:17,360 three of those factors can make a site not be 316 00:27:14,440 --> 00:27:22,960 accessible. The standard of accessibility change over time. So, if I 317 00:27:20,159 --> 00:27:28,559 built a new building that was ADA compliant at the time it was uh received 318 00:27:25,679 --> 00:27:35,200 its CO and I maintained it, can I expect it to stay in compliance or uh are there 319 00:27:32,240 --> 00:27:42,720 changes to the regulations that we have to understand and um that could 320 00:27:39,400 --> 00:27:49,520 potentially take a certified building or an ADA compliant building and uh make it 321 00:27:46,080 --> 00:27:55,919 out of compliance? No. So the standard the design standards have changed just 322 00:27:51,640 --> 00:28:02,320 twice 1991 and then in 2010 in a normal world I'd say look for a change around 323 00:27:58,840 --> 00:28:06,559 2030. Um so that's typically then the cycle. So you're just held to the 324 00:28:04,480 --> 00:28:10,399 standard that was in existence when the building was constructed. Correct. So 325 00:28:08,320 --> 00:28:18,360 it's called the concept of safe harbor. If you diligently made sure that the 326 00:28:14,120 --> 00:28:23,840 1999 building complied with the 1991 standards and then the size of the 327 00:28:20,799 --> 00:28:30,320 restroom changed in 2010 or the height of reach range for operating mechanisms 328 00:28:26,399 --> 00:28:34,320 like light switches changed in 2010, as long as yours were compliant with the 329 00:28:32,240 --> 00:28:41,200 1991 standard, you don't have to go back in and change it. So reach range was 330 00:28:37,440 --> 00:28:47,440 allowed to be 54 in. So when we audit, if we know the building was built in 331 00:28:44,200 --> 00:28:55,279 1999, but your light switches are at 56 in, not 54 in, you fail. And now it's 332 00:28:52,000 --> 00:29:01,200 got to go down to 48 in, not 54 in. Does that make sense? So safe harbor applied, 333 00:28:58,240 --> 00:29:07,679 but I mentioned that park assets were not included until 2010. There's no safe 334 00:29:04,799 --> 00:29:10,399 harbor for park assets, but there is for the 335 00:29:13,440 --> 00:29:20,320 Thank you, John. Thank you all very much. And when do you expect to wrap up 336 00:29:17,360 --> 00:29:26,480 the uh project? What is the timeline on that? Summer 2026. 337 00:29:22,440 --> 00:29:30,559 Yeah, late summer. Thank you. Thank you. Appreciate it.