[0:00] come [0:10] [Music] [0:30] you [0:42] know so they have a you can see the list of the that they have to you know they [0:49] got to put you know but that's the [0:55] downside you know what I'm saying [1:07] all right I'm going to call this meeting the [1:09] order roll call uh Mr Christenson here Mr Clark here Mr Herman here Mr Reynolds [1:17] here Mr Taylor here Orman wall here Mr van FR [1:22] here okay uh need a motion to adop to adopt the agenda excuse me I make a [1:29] motion to adop second motion [1:33] carries approval of the September 9th 2024 meeting minutes I need a [1:40] motion I'll move to approve second [1:46] okay sorry you just want to make sure that you ask for approval from all the [1:51] board oh just say all all in favor [2:01] okay uh we're going to move into the public comment section there is nobody [2:05] signed up to speak and uh we will close that and [2:09] moving forward and we will go into the report uh the report is here for you to [2:15] review like to encourage you to take a moment to review this [2:49] I'll make a motion to approve the [2:54] report second motion carries and we're going to move into all [3:00] in favor [3:04] sorry and we're going to move into new business or discussion [3:09] items and this is going to be the presentation for this month's meeting [3:15] I'm going to give it over to Ian yeah I'm just going to run through [3:20] um hit on some of the highlights we've covered over the [3:24] past four months I've been for two of those months [3:30] so gradu uh board topics we have public Outreach cumington Ben engineering study [3:37] kalista Road retention Pond expansion a trail project update enforcement and the [3:44] update on the Federal Emergency Management agency [3:47] Grant so for public Outreach uh we have the tree day for 20125 coming up [3:55] and that would be in March 15th through of 2025 Lo at at the White House [4:01] Municipal Park from 8:00 a.m. to 12:00 p.m. it's 94 days [4:06] away uh an update for that is we have ordered 1,000 trees this year that's an [4:12] year-over-year increase of 600 trees from last year [4:17] yeah um input that you did not have enough trees to [4:22] support the uh the residents they went through the trees [4:27] within 30 to 45 minutes last year so we want to increase the uh amount of trees [4:33] to be able to give more trees to more citizens 13th annual Urban 5K run for [4:42] 2025 uh we will be looking to participate in that that the date on [4:47] that is is to be [4:51] determined the storm water engineering study for cumington Heights as a result [4:56] of the study area uh three main subbasins have been identified that [5:02] drain into the neighborhood uh most of the inlets are adequately sized however [5:07] elevation differences lead to ineffective means to transport water and [5:13] as a result of this study there is a review for [5:19] tonight at 5:30 [5:27] p.m. the stor water s orist a road retention [5:34] Pond uh see [5:41] here the property that is necessary for the expansion process has been [5:53] complete the estimated funds to excavate the the [5:59] additional um property ex currently exceeds the [6:03] funds available so we are having F the discussions to [6:07] to best find a rout to solution there the pr Trail project [6:16] update it's complete sidewalks and curbing have been addressed as you can [6:20] see from the photos uh the road has been paved and retainage for that is being [6:26] released [6:30] this is a couple highlights from our enforcement over the past [6:36] quarter couple of of the larger Pro uh developments Kester Farms CES Crossing [6:43] Concord Springs and for those three it's it's the same thing it's just erosion [6:51] and settlment control uh issues [6:56] um just um trying to stay on top of S transport off site so we're really um [7:03] trying to hammer that into uh the developers Minds right there for cider [7:07] grow that's the the [7:10] [Music] new pug [7:14] development between or adjacent to Raymond Hurst [7:21] Parkway there were some Geotech drilling that was occurring on site uh that had [7:27] uh pushed some dirt into an identifi stream so we we had a whole um work on [7:34] that to uh provide um remediation to the stream which has been [7:41] rectified this is just a highlight of some some local businesses [7:47] that uh were identified as having elicit discharge entering directly into the [7:53] storm water uh system it's uh [7:59] this just an awareness uh issue that we're trying to [8:02] hammer to these uh local businesses to keep any gray water water [8:10] that uh is used for cleaning so it has water that has detergents really keep [8:15] that to out of the stor water uh system and keep it to the uh to the drains to [8:22] enter into the the Wastewater system so it can be treated correctly you do you [8:26] know what the type of the list discharge each of these words you mentioned gray [8:32] water but so the ones to the left were Water Burger that is [8:37] uh concrete clean out uh cleaning out the whatever uh container they had to [8:45] pour washed out the TRU yeah cont TR yeah and it uh they washed it out on [8:51] site and it just they didn't contain it and it just made its way off the site [8:56] down the side road directly into the storm dra [9:01] and then uh the photo to the right is just [9:07] um just soap Water waste water from um business activities same thing [9:14] with de la positive is just uh emptying a mop bucket full of detergent directly [9:21] into the water is that one from the mobile pering [9:26] service is that is that a picture from that I mean [9:29] how did you catch that we had a um an inspector that was Happ to see it making [9:34] their rounds and they they notic that noticed something said something called [9:38] us and we reached out to them and they were they were unaware that that was a a [9:42] discharge they they didn't they probably do this all the time I would think right [9:46] not realiz realiz they said they said everyone does it so they didn't know any [9:50] any of the wiser that they were doing anything incorrect okay so what you [9:55] recommend to them how would you uh we gave him an NLB [9:59] they should just how would they correct that you think they probably just have a [10:04] normal just discharge it under the road yeah under the [10:09] property to reach out to us if they had any questions but I guess going forward [10:14] just to have a a portable container to put that in until they can get to a [10:19] permanent location to empty that discharge [10:23] that okay I I would assume they would have to discharge somewhere like a [10:29] whoever would accept that that water it's going to be nowhere in our storm [10:33] water system that you can do that but maybe maybe Travis and those guys can [10:38] accept it as [10:43] Wastewater otherwise they got to go find somewhere else that does except you know [10:47] whatever I don't know what El in their [10:52] water yeah most people don't realize you're not supposed to was your car and [10:56] let it discharge onto the street you know clear water it's not supposed to go [11:01] out [11:09] so last thing we have is the FEA Grant [11:15] process the application has been submitted to Teemo it is in the review [11:22] process they had a couple comments we've addressed those comments and now we are [11:27] just waiting for them to to to re-engage it if those comments are are [11:33] sufficient for the continuation of this of this [11:42] project yeah so in this in this particular case not to interrupt but [11:47] just to because I've been contacting them quite frequently about this I and [11:51] I'm going to just uh interject here uh they asked for I think I've let you know [11:57] this Jer they've asked for phase two project request for this uh because FEMA [12:04] will not approve or fund just uh an overall study of the city of white house [12:10] so they actually want to have an identified project uh that can be [12:14] completed um something that we would move towards um on the on the back end [12:19] of the study uh so we still are in communication with [12:24] teema um I haven't been able to get a hold of [12:28] him today he did reach out to me Friday uh haven't been able to get a hold of [12:32] him today but uh that's the project because we had [12:36] the most uh concrete numbers if you will uh the most solidified numbers for that [12:43] particular project is the reasoning behind why we inserted that project as [12:47] our phase two project but they did say that we do have the ability and the [12:52] flexibility to be able to adjust that and input another project in its place [12:57] if we so choose [13:03] that's all I that's all we have [13:11] for okay um other business we have [13:19] none and we are [13:25] J for the old days right [13:34] straighten [13:38] [Music] [13:58] up e