1 00:00:00,000 --> 00:00:03,000 Ready? 2 00:00:08,000 --> 00:00:17,600 » Williams County Regional Planning Commission is now called to order. 3 00:00:13,360 --> 00:00:20,960 We do have a quorum. Any announcement, staff? 4 00:00:19,199 --> 00:00:26,960 » Uh, thank you, Mr. Chairman. On your desk in front of you, you do have a 5 00:00:22,480 --> 00:00:34,399 revised agenda. Items number 5, 27, and 31 have been withdrawn. 6 00:00:29,519 --> 00:00:39,760 Items number 25, 26, 29, and 32 are on your consent agenda for deferral. You do 7 00:00:37,280 --> 00:00:45,120 have a revised report for item 31 noting the withdrawal request on your desk. And 8 00:00:42,800 --> 00:00:48,120 finally, just a reminder that your March meeting. 9 00:00:49,200 --> 00:00:56,640 » Sorry. Thank you. A reminder that your March meeting will be held on Thursday, 10 00:00:53,840 --> 00:01:00,000 March the March 19th. So that's the third Thursday of the month rather than 11 00:00:58,239 --> 00:01:02,960 the second. That's all I have, Mr. Chairman. 12 00:01:00,800 --> 00:01:06,720 » Thank you. At this time, we could have the public 13 00:01:04,879 --> 00:01:12,960 comment and no one has signed up for that. So we'll go to consideration of 14 00:01:09,040 --> 00:01:16,000 the minutes for January 8th, 2026. Has everybody had a chance to read them, 15 00:01:14,799 --> 00:01:18,080 review them? >> Motion to approve. 16 00:01:17,360 --> 00:01:21,759 » Second. >> Motion made in a second. All in favor 17 00:01:19,840 --> 00:01:28,320 signify by saying I. >> Motion carries. Thank you. 18 00:01:24,880 --> 00:01:33,040 Consideration of the consent agenda. Uh we'll take it as a whole unless any of 19 00:01:30,479 --> 00:01:36,960 the commissioners want to uh >> take one. Sharon 20 00:01:35,200 --> 00:01:41,920 » is recusing herself from it. >> The consent agenda. Mr. Chair. Thank 21 00:01:39,200 --> 00:01:46,320 you. >> Okay. Do we have a motion on the consent 22 00:01:44,640 --> 00:01:50,000 agenda? >> Motion to approve. 23 00:01:48,240 --> 00:01:52,399 » Motion made and second. All in favor signify by saying I. 24 00:01:51,759 --> 00:01:56,759 » I. >> Approved. Thank you. 25 00:02:00,719 --> 00:02:12,039 The first item on the agenda is Terra Farerrell Road drainage and erosion 26 00:02:06,719 --> 00:02:12,039 control bond update number 24. 27 00:02:13,280 --> 00:02:21,440 » Hi, uh Brent Theny with True Land representing Jones Company. Um start 28 00:02:19,200 --> 00:02:28,319 with the fire pit site plan area that has been submitted is under review by 29 00:02:23,760 --> 00:02:33,440 the county. Um phase one engineer just sent back that had been under review and 30 00:02:31,520 --> 00:02:37,760 uh the engineer sent back comments from that today. So we'll work through those, 31 00:02:35,680 --> 00:02:43,840 read through them and work through them. Phase two, the slope repairs are 32 00:02:40,000 --> 00:02:49,200 essentially 80% of it's done. The fabric um has been installed. the drains, the 33 00:02:46,000 --> 00:02:54,959 stone. We did a rough, what I would call final grade, trying to beat the ice 34 00:02:51,360 --> 00:02:59,760 snowstorm and did a rough stabilization. We'll need to go back, pull that back, 35 00:02:56,800 --> 00:03:07,280 and do a finish final grade on that uh and restabilize it. Uh so that's yet to 36 00:03:03,200 --> 00:03:12,400 be complete. Um the head walls had not been finished. The fabric has been um 37 00:03:10,640 --> 00:03:16,560 verified in those and those have been finished. 38 00:03:14,000 --> 00:03:22,319 Um there's one uh road repair. The county has asked for more cores for 39 00:03:18,800 --> 00:03:26,159 phase 2 road uh in certain areas. Uh we've contracted the geotech and we're 40 00:03:24,560 --> 00:03:31,760 waiting for him to do that and we'll see what comes out of that. There's one 41 00:03:28,000 --> 00:03:37,280 additional um small road repair. We may tie in with that depending what comes 42 00:03:33,440 --> 00:03:41,519 out of that. Um I think that's it. There's one homeowner 43 00:03:39,760 --> 00:03:46,640 in the back of a homeowner's yard that's not on the RD checklist. we've agreed to 44 00:03:43,680 --> 00:03:50,720 fix. Uh that's midway up. That's I'm not sure what it's from. Um we'll fix that 45 00:03:49,120 --> 00:03:56,879 when we do all the dirt work with the slope repair. Uh the wastewater road is 46 00:03:54,159 --> 00:04:02,480 I think we're close to making a full I'll call it determination on that 47 00:03:58,640 --> 00:04:07,120 material and um meeting what the county needs, working through that. Once that 48 00:04:04,640 --> 00:04:14,000 is ultimately finalized, we'll finish that part of it. And there's been um one 49 00:04:11,200 --> 00:04:19,680 additional dropout that has opened up near the wastewater road we'll look at 50 00:04:15,680 --> 00:04:25,840 and have the geotech look at. Um and I think that's everything to this point. 51 00:04:22,400 --> 00:04:29,880 Okay. Thank you. Is the staff satisfied with the progress out there? 52 00:04:30,080 --> 00:04:37,840 » Well, yeah, there's progress. Um and I mean, you know, we're we're definitely 53 00:04:35,120 --> 00:04:41,759 moving in the right direction. Um there's still a lot of open issues, but 54 00:04:39,680 --> 00:04:45,840 there's quite a few issues that have been closed. Um so we'll just kind of 55 00:04:44,240 --> 00:04:49,759 have to wait and see. I know, you know, I agree with the things he said as far 56 00:04:47,520 --> 00:04:54,880 as some of the stabilization been done, but it it does need some improvement and 57 00:04:51,919 --> 00:04:57,919 some of the pond work, you know, it's >> worse than needs to be stabilized that 58 00:04:56,960 --> 00:05:02,720 that >> mat rolled up and we need to fix that. 59 00:05:00,240 --> 00:05:08,320 And also we'll need some more um and that's one of the open issues um some 60 00:05:04,880 --> 00:05:15,520 slope information from the engineer um make sure we get all the right um slopes 61 00:05:11,600 --> 00:05:20,800 on site. Um so yeah, I mean it's a work in progress and um but it it is in 62 00:05:18,479 --> 00:05:24,639 progress so so that's good. >> Okay, thank you. Does the commission 63 00:05:23,039 --> 00:05:29,680 have any questions to the applicant on this? 64 00:05:26,000 --> 00:05:35,600 » What uh what can we expect next month? Uh if the road material gets worked out, 65 00:05:32,560 --> 00:05:40,800 hopefully that'll be completed. Um the slope repairs should be done. Um 66 00:05:38,639 --> 00:05:47,199 depending on the timing of the geotech for the additional cores, um may or may 67 00:05:44,400 --> 00:05:51,600 not be done. I would think that would be done, but until they tell me when they 68 00:05:49,360 --> 00:05:55,199 can get out there, I can't answer that. Um, 69 00:05:53,440 --> 00:06:00,160 and then if we get the slope repairs, depending on the engineer being able to 70 00:05:57,360 --> 00:06:03,520 get the additional asbuilt shots, that may or may not be done depending on 71 00:06:01,680 --> 00:06:06,880 their survey schedule. >> Okay. 72 00:06:04,000 --> 00:06:09,840 » Um, the pond should be done. >> Thank you. 73 00:06:07,600 --> 00:06:14,160 » Yep. Sure. >> Do you have any idea when this will all 74 00:06:12,000 --> 00:06:20,800 be wrapped up? um hopefully soon but it continues to to 75 00:06:17,440 --> 00:06:25,120 a degree till right till like the cores right that was sent in 76 00:06:23,520 --> 00:06:30,160 now there's some additional work that needs to happen there so depending on 77 00:06:27,600 --> 00:06:34,880 what comes out of that result and what the county determines 78 00:06:32,960 --> 00:06:40,880 uh you know will depend how fast that can happen um 79 00:06:38,240 --> 00:06:47,039 same with the wastewater road once that's um gets finalized, you know, 80 00:06:44,400 --> 00:06:51,280 we'll get in on schedule and do it. Um I haven't looked I started to look at the 81 00:06:48,880 --> 00:06:54,960 phase one comments, so I need to work through those. I don't know what all's 82 00:06:52,880 --> 00:06:59,840 been requested in those yet. They just came out today. So, 83 00:06:58,880 --> 00:07:03,440 » okay. Thank you, Mr. >> Chairman. Sir, 84 00:07:01,599 --> 00:07:08,319 » yeah, I mean, we're starting we're going to get into the rainy season and uh 85 00:07:06,240 --> 00:07:14,400 their engineer claims that they can stabilize the wastewater road. We don't 86 00:07:12,000 --> 00:07:17,360 think that that's going to be possible. So, in that we're going to hold on to 87 00:07:16,160 --> 00:07:21,520 the maintenance bond. We're going to look at it. It's not like they're going 88 00:07:19,759 --> 00:07:26,080 to get their bond released in the next couple of months. So, you know, there's 89 00:07:24,240 --> 00:07:30,160 still issues out there. They got ponds that don't drain. There's no reason why 90 00:07:28,960 --> 00:07:34,479 they couldn't have been going out there for the last several months and cleaning 91 00:07:32,000 --> 00:07:38,319 some of this up. We got an engineer who says it's built per the plans. It's not 92 00:07:36,479 --> 00:07:42,960 built per the plans. There are significant deviations. So, this is 93 00:07:41,280 --> 00:07:48,560 going to take a while and if they don't get it right by summer, we're going to 94 00:07:45,440 --> 00:07:52,759 be talking about calling the bond. >> Okay. Thank you. 95 00:07:52,800 --> 00:07:56,800 » Any questions on that? >> No. 96 00:07:54,720 --> 00:08:01,000 » Okay. Well, thank you. 97 00:07:57,759 --> 00:08:01,000 » Thank you. 98 00:08:02,240 --> 00:08:12,160 » Okay. Item number 25, uh, Chester Hill, that's been deferred. And item number 26 99 00:08:09,599 --> 00:08:16,879 has been deferred. Item numbers 27 has been withdrawn. Item 100 00:08:14,960 --> 00:08:22,720 number 28, final flat review, reapproval for 101 00:08:19,840 --> 00:08:29,199 Stevens Valley section 12 containing zero lots on 777 acres located off of 102 00:08:27,199 --> 00:08:33,200 Stevens Valley Boulevard in the eighth voting district. Staff. 103 00:08:31,039 --> 00:08:37,279 » Yeah, thank you, Mr. Chairman. The development is located off of 104 00:08:35,039 --> 00:08:44,320 Stevens Valley Boulevard shown in the red. Section 12 total 0.77 acres. The 105 00:08:41,440 --> 00:08:51,279 section boundary shown in the blue. It contains zero buildable lots. It'll have 106 00:08:47,760 --> 00:08:56,080 0.53 acres as open space shown in the green. And the purpose of the reapproval 107 00:08:53,600 --> 00:09:00,880 is to add the uh a condition for the roads drainage and road control bond. 108 00:08:59,120 --> 00:09:06,240 water and sewers provided by the Harpet Valley Utility District. 109 00:09:04,160 --> 00:09:11,360 The final plat is consistent with the prelim prelim preliminary plant and 110 00:09:09,360 --> 00:09:15,760 staff recommends reapproval with conditions outlined in the staff report 111 00:09:13,120 --> 00:09:20,600 including the estab establishment of the RDE bond in the amount of $53,000. 112 00:09:21,360 --> 00:09:25,560 » Thank you. Is the applicant present? 113 00:09:27,200 --> 00:09:33,200 » Yes, sir. Uh Jeremy West Morland with CSTG. I'm the civil engineer on the 114 00:09:31,279 --> 00:09:36,880 site. We have no objections to staff comments, but I'm happy to answer any 115 00:09:34,640 --> 00:09:41,720 questions that may come up. >> Any questions of the applicant from the 116 00:09:38,720 --> 00:09:41,720 commission? 117 00:09:43,200 --> 00:09:49,839 » Motion to approve first staff. >> Motion in a second. All in favor signify 118 00:09:48,640 --> 00:09:52,000 by saying I. >> I. 119 00:09:50,320 --> 00:09:58,560 » Opposed. Motion passes. Thank you. 120 00:09:55,839 --> 00:10:06,720 Concept plan item number 29, Old Murphy'sboro Road has been deferred. 121 00:10:02,080 --> 00:10:13,680 Uh site plan on item 30, non-residential site plan review for Tomb Creek Farm 122 00:10:10,399 --> 00:10:19,279 Nursery on 10 acres located off Arnold Road in the 12th voting district. Staff, 123 00:10:16,880 --> 00:10:25,920 » thank you, Mr. Chairman. Sites located off Arnold Road on a road shown in the 124 00:10:21,200 --> 00:10:31,680 red. The development totals 10.08 acres. The property boundary shown in the blue. 125 00:10:28,959 --> 00:10:37,600 We're proposing 15 green houses shown in the green totaling 66,600 square ft for 126 00:10:35,440 --> 00:10:44,160 a nursery producing cut flowers for retailers. There there will be no retail 127 00:10:40,560 --> 00:10:47,839 activity on site. The existing house and septic system will remain in the 128 00:10:45,680 --> 00:10:51,839 residential use. It would not be used as for the nursery. They're going to have 129 00:10:50,240 --> 00:10:56,000 portable toilets for 3 to five employees. Irrigation will be from 130 00:10:54,320 --> 00:11:04,040 Wales. And staff recommends approval. 131 00:10:59,839 --> 00:11:04,040 Thank you. Is applicant present. 132 00:11:12,800 --> 00:11:19,600 Uh good afternoon. Uh my name is Son Choy. I'm the co-owner of the Tonqu 133 00:11:17,279 --> 00:11:21,839 Farm. I'm happy to answer any questions you guys have. 134 00:11:21,120 --> 00:11:23,680 » Okay. >> I have a question. 135 00:11:23,279 --> 00:11:28,240 » Yes. >> So, have the necessary licenses been 136 00:11:26,240 --> 00:11:32,320 obtained through the Tennessee Department of Agriculture? 137 00:11:29,680 --> 00:11:34,880 » Uh, it's in the process right now uh being communicating with the uh the 138 00:11:33,839 --> 00:11:40,640 Tennessee Department of Agric agriculture uh very diligently. Uh they 139 00:11:37,760 --> 00:11:45,760 said that the uh as long as you obtain uh approval first before you started the 140 00:11:43,519 --> 00:11:50,160 uh selling activity, you'll be fine. So, yeah, we are in contact with them. Okay. 141 00:11:47,760 --> 00:11:54,240 Do they did they indicate when that when those would be completed and to you? 142 00:11:52,640 --> 00:11:57,839 » Oh, they said it's a it's a pretty short turnar around. They shouldn't take too 143 00:11:55,680 --> 00:12:01,279 much time. Uh usually if you submit a request and they you're looking about 144 00:11:59,519 --> 00:12:02,320 two weeks or three weeks should get back. 145 00:12:01,519 --> 00:12:06,959 » All right. Thank you. >> Yes. 146 00:12:05,200 --> 00:12:11,839 » Any other questions? >> I have a quick question. You may have 147 00:12:08,959 --> 00:12:13,200 said this. How many employees >> uh 148 00:12:12,079 --> 00:12:17,920 » do you expect >> Yeah. At a full scale, if you have 15 or 149 00:12:15,680 --> 00:12:22,079 high tunnel constructed, uh the the total amount of employee should be 150 00:12:19,200 --> 00:12:28,040 around 15. So roughly about one employee per per uh greenhouse, so to speak. 151 00:12:25,040 --> 00:12:28,040 » Yeah. 152 00:12:29,360 --> 00:12:36,800 » I've got a question. I don't know for staff or from the applicant, but uh the 153 00:12:33,440 --> 00:12:41,279 the house on the property uh the sewer system is they're going to do away with 154 00:12:39,600 --> 00:12:45,680 we're going to use portables. Is there any reason why we're going for portables 155 00:12:43,120 --> 00:12:49,600 on a situation like this >> with 15 employees? 156 00:12:47,839 --> 00:12:54,240 » The building code does not require permanent restroom facilities. 157 00:12:52,000 --> 00:12:59,279 And so that's why we're they're going with the portable facilities. 158 00:12:56,639 --> 00:13:03,519 So we we coordinate it with the building codes department regarding this this 159 00:13:02,240 --> 00:13:07,360 use. >> But Aaron, the existing septic system is 160 00:13:05,440 --> 00:13:11,519 going to remain in use for the house. >> That is correct. Yes. 161 00:13:09,279 --> 00:13:15,040 » Okay. Thank you. >> Question. 162 00:13:13,279 --> 00:13:18,560 » I was reading this earlier knowing that there were portable toilets. It 163 00:13:16,560 --> 00:13:25,040 mentioned three to five employees, but you're saying 15 or 16. I think you said 164 00:13:22,399 --> 00:13:29,360 one per nursery and there's or one per greenhouse and there's 16 green houses. 165 00:13:27,120 --> 00:13:33,519 » Yeah. 15 green houses all together, but that will be like a it's a multi-year 166 00:13:31,440 --> 00:13:35,760 phase. We're not constructing all 15 at one time. Okay. 167 00:13:34,320 --> 00:13:39,600 » So, first year you only look at about two. Uh so depending on the number of 168 00:13:38,480 --> 00:13:42,800 you know depending how frequent they're going to be using all the toilets we 169 00:13:41,279 --> 00:13:45,040 might just add a bit more but uh you know beginning we'll have two to start 170 00:13:44,480 --> 00:13:48,320 off with. >> Gotcha. 171 00:13:46,000 --> 00:13:53,839 » And then the question for staff is on parking then 172 00:13:50,480 --> 00:13:57,760 » with this being agricultural RD5. What are the parking requirements? 173 00:13:56,560 --> 00:14:01,839 » Joe, do you know the parking requirements? 174 00:13:59,519 --> 00:14:04,839 » Uh not without looking at the ordinance. Uh, 175 00:14:05,199 --> 00:14:11,360 » I'm just curious cuz I think there's only like maybe I don't know, I can't 176 00:14:09,519 --> 00:14:16,000 tell from the small scale. I looked at it larger on the computer, maybe six 177 00:14:13,680 --> 00:14:19,920 parking spaces. And in my mind, it's like, oh, that makes sense if there's 178 00:14:17,440 --> 00:14:23,920 five employees, but if there's 15 employees, just want to make sure you 179 00:14:21,519 --> 00:14:29,839 have the right parking you need. >> Uh, yeah, I think on the map there was a 180 00:14:27,440 --> 00:14:34,000 two section of designated parking spot. uh like a kind of like a semi- customer 181 00:14:32,399 --> 00:14:38,079 parking spot, an employee parking spot because we don't have any retail 182 00:14:35,199 --> 00:14:41,040 activity going on. So, we can if if that's a question, we can easily, you 183 00:14:39,600 --> 00:14:46,199 know, add that into that employee parking, but that will take several 184 00:14:43,199 --> 00:14:46,199 years. 185 00:14:47,600 --> 00:14:52,639 » Commissioner, there's sufficient parking there. 186 00:14:49,680 --> 00:14:58,800 » Okay, great. >> I have got a quick question. Um, 187 00:14:56,560 --> 00:15:02,079 so green houses, I'm assuming uh you'll be using LED grow lights or something 188 00:15:00,880 --> 00:15:05,440 like that >> at night. 189 00:15:03,760 --> 00:15:09,839 » Yeah, it's uh it's we call them greenhouse, but essentially those are we 190 00:15:06,959 --> 00:15:15,199 call the high tunnel units. Uh uh they use the uh largely the the polyethylene. 191 00:15:13,199 --> 00:15:19,760 So those are very transparent to the the sunlight because we want to be uh 192 00:15:16,800 --> 00:15:25,360 conserving energy and how you guys can you know require a lot of energy. Uh so 193 00:15:23,279 --> 00:15:28,399 uh and also the uh depending on the flower type that you have we don't do 194 00:15:26,800 --> 00:15:33,519 any kind of a force flowering and alteration of their natural hab you know 195 00:15:31,040 --> 00:15:37,560 uh habits. So we don't require that. >> Okay. Thank you. 196 00:15:34,560 --> 00:15:37,560 » Yeah. 197 00:15:41,600 --> 00:15:49,600 » Another question following up on what Sharon asked. Uh would the final on the 198 00:15:47,040 --> 00:15:54,560 final on this would they be required to show the permits agricultural permits? 199 00:15:52,800 --> 00:16:00,320 » They would not be required to. We would ask them to show them for us. Yes. 200 00:15:58,160 --> 00:16:03,279 » Okay. And we might consider that part of the motion to 201 00:16:01,839 --> 00:16:08,600 » Yes. >> Okay. 202 00:16:05,040 --> 00:16:08,600 Any other questions? 203 00:16:09,120 --> 00:16:13,399 Do we have a motion on this item? 204 00:16:14,079 --> 00:16:24,959 I'll make the motion that we require that the uh necessary licenses permits 205 00:16:20,880 --> 00:16:29,680 are to be shown and have been acquired by the owner before it's 206 00:16:29,120 --> 00:16:32,160 » are you >> that is part of your motion 207 00:16:30,959 --> 00:16:34,880 » approval with that condition? >> Yes. I'm sorry. Yes. 208 00:16:33,839 --> 00:16:38,480 » Okay. >> Do we have a second on that? 209 00:16:36,880 --> 00:16:44,480 » Second. All in favor signify by saying I 210 00:16:41,600 --> 00:16:50,720 » opposed. Motion passes. Thank you. >> Thank you. 211 00:16:46,880 --> 00:16:56,480 » On preliminary plats, item 31 uh has been withdrawn. 212 00:16:53,199 --> 00:17:02,480 Item 32 has been deferred and item number 33 is preliminary plat review for 213 00:16:58,959 --> 00:17:07,679 Burns subdivision. Phase 2 containing 32 lots on 37.55 214 00:17:04,799 --> 00:17:12,640 acres located off of Patton Road in the fifth voting district. Staff. Yeah. 215 00:17:10,240 --> 00:17:17,360 Thank you, Mr. Chairman. The development is located off Patent Road and it's as 216 00:17:15,039 --> 00:17:23,839 access from Horton Highway to the west. Patent Road shown in the red. 217 00:17:20,079 --> 00:17:28,640 This phase totals 37.55 acres. There you see the phase boundary in the 218 00:17:25,520 --> 00:17:32,559 blue. Consist of 32 lots. There's the 32 lots in the pink. 219 00:17:30,559 --> 00:17:38,240 be approximately 8 acres of open space shown in the green and gray. 220 00:17:35,280 --> 00:17:42,720 Uh it will install a greenway trail at the north perimeter shown in in the dark 221 00:17:40,080 --> 00:17:47,039 green. Roads will be private there. You see the roads in the yellow. Waters 222 00:17:45,360 --> 00:17:51,440 provided by the Nlesville College Grove Utility District. Lots are served by a 223 00:17:49,760 --> 00:17:55,600 nontraditional wastewater treatment and disposal system. 224 00:17:53,360 --> 00:17:59,840 and the preliminary plan is consistent with the concept plan and staff 225 00:17:58,080 --> 00:18:07,720 recommends approval with that standard conditions outlined in the staff report. 226 00:18:03,360 --> 00:18:07,720 Thank you. Is the applicant present? 227 00:18:11,200 --> 00:18:17,679 » Yes, Richard House with SEC. Happy to answer any questions. 228 00:18:15,760 --> 00:18:19,600 » Any problem? Anything with the staff's report? 229 00:18:18,720 --> 00:18:26,520 » No problems. >> Okay, fine. Thank you. Any question for 230 00:18:22,320 --> 00:18:26,520 the commission? This applicant 231 00:18:30,880 --> 00:18:35,600 » motion >> approve for staff recommendation. 232 00:18:34,400 --> 00:18:38,640 » Motion. Do we have a second? >> Second. 233 00:18:36,480 --> 00:18:40,320 » Motion and second. All in favor signify by saying I. 234 00:18:39,760 --> 00:18:46,400 » I. >> Opposed. Motion carries. Thank you. 235 00:18:43,840 --> 00:18:53,440 Item number 34, preliminary platform burn subdivision phase 3 containing 26 236 00:18:50,080 --> 00:18:56,400 lots on 30.73 acres located off of patent road in the fifth voting 237 00:18:55,039 --> 00:19:01,760 district. Staff, >> thank you, Mr. Chairman. 238 00:18:58,480 --> 00:19:07,039 Again, these this development is located off Patent Road and access from Horton 239 00:19:04,000 --> 00:19:14,400 Highway to the west. This phase totals 30.73 acres shown in the blue. uh 240 00:19:11,200 --> 00:19:20,640 consist of 26 lot shown in pink be approximately 9.33 37 acres of open 241 00:19:16,960 --> 00:19:26,960 space shown in the greenway trail will be uh installed on the north 242 00:19:23,200 --> 00:19:34,000 perimeter um in alignment with the phase two roads will be private 243 00:19:31,120 --> 00:19:38,960 shown in the yellow water be provided by the Nville Cro utility district lots are 244 00:19:37,360 --> 00:19:43,039 served by a nontraditional wastewater treatment and disposal system. The 245 00:19:41,360 --> 00:19:47,200 preliminary plan is consistent with con with with the concept plan and staff 246 00:19:45,679 --> 00:19:53,400 recommends approval with the standard conditions outlined in the staff report. 247 00:19:50,160 --> 00:19:53,400 » Thank you. 248 00:19:56,080 --> 00:20:02,320 » No issues with the staff report. >> Okay. Thank you. Any questions of the 249 00:20:00,880 --> 00:20:04,240 applicant on this? >> Quick question, 250 00:20:03,440 --> 00:20:10,960 » sir. >> The greenway, I see that it's near 840. 251 00:20:07,600 --> 00:20:16,320 How close is that to the interstate? >> It's uh about from the actual road 252 00:20:14,400 --> 00:20:20,960 itself, it's probably a couple hundred feet, but it's it's within our boundary, 253 00:20:18,720 --> 00:20:24,080 I think 50 feet or so. >> Okay. 254 00:20:22,160 --> 00:20:26,880 » Is it is there any buffer between the greenway and the interstate or is it 255 00:20:25,360 --> 00:20:30,600 » There are trees and stuff between the interstate. So, 256 00:20:31,360 --> 00:20:34,360 okay. 257 00:20:34,799 --> 00:20:38,280 » Any other questions? 258 00:20:38,480 --> 00:20:45,919 Do we have a motion on this item? >> Motion to approve first. 259 00:20:43,840 --> 00:20:51,200 » A motion to second. All in favor signify by saying I. I. 260 00:20:47,840 --> 00:20:57,600 » Motion passes. Thank you. Item number 35, preliminary plat review for the keep 261 00:20:54,640 --> 00:21:03,840 at Arrington subdivision containing 13 lots on 88.03 acres located off of Haley 262 00:21:01,280 --> 00:21:07,840 Road Lane in the fifth voting district. Staff. 263 00:21:05,840 --> 00:21:11,919 » Thank you, Mr. chairman. This property is located off of Haley Lane, shown in 264 00:21:09,840 --> 00:21:17,200 red along the right side of the screen. The development total is 88.03 acres in 265 00:21:14,720 --> 00:21:22,400 size and contains 13 lots shown in the pink. Uh there's approximately 13.2 266 00:21:20,720 --> 00:21:26,240 acres of open space and that is shown in the green. The roads will be public and 267 00:21:24,640 --> 00:21:29,760 the roads are shown in the yellow. Waters provided by the Nolanville 268 00:21:27,679 --> 00:21:34,240 College Grove Utility District. Lots will be served by individual on-site 269 00:21:31,280 --> 00:21:37,360 sector systems. The Department of S not yet. Uh this plan is consistent with the 270 00:21:35,919 --> 00:21:40,400 concept plan and staff recommends approval standard conditions outlined in 271 00:21:38,720 --> 00:21:45,000 the staff report. >> Thank you. The applicant present 272 00:21:46,240 --> 00:21:54,720 » one last time. >> No issues with the stock report. 273 00:21:51,039 --> 00:21:58,360 » Any questions of this applicant? >> Do we have a motion? 274 00:21:59,840 --> 00:22:06,240 » Motion and second. All in favor signify by saying I. opposed. Motion passes. 275 00:22:05,760 --> 00:22:12,000 Thank you. >> Thank you. 276 00:22:08,000 --> 00:22:18,240 » Under final plats, item number 36, final plat review for re-ubdivision of lot 277 00:22:14,960 --> 00:22:24,159 one, the Flint Meadow LLC subdivision containing three lots on 18.25 acres 278 00:22:21,679 --> 00:22:28,320 located off of Steeplechase Lane in the eighth voting district. Staff, thank 279 00:22:26,640 --> 00:22:32,000 you, Mr. Chairman. The property is located off Steeplechase Lane shown in 280 00:22:30,080 --> 00:22:35,760 red at the top of the screen. The development total is 19.25 acres in 281 00:22:34,240 --> 00:22:42,080 size. You can see the entire development in the blue. The development contains 282 00:22:38,720 --> 00:22:45,200 one lot created in 2022 and this will be adding two family subdivision lots for a 283 00:22:43,679 --> 00:22:49,200 total of three lots. The family subdivision lots are shown in the pink. 284 00:22:47,760 --> 00:22:53,360 These lots are accessed by an access easement shown in the yellow. Resource 285 00:22:51,600 --> 00:22:56,799 action standards have been met. Water is provided by the Harpath Valley Utility 286 00:22:54,880 --> 00:23:00,799 District. Wastewater handled via the Harpath Valley Utility District as well. 287 00:22:59,039 --> 00:23:03,200 The revised final plat is in order and staff recommends approval with the 288 00:23:02,080 --> 00:23:09,880 standard conditions outlined in the staff report. 289 00:23:04,880 --> 00:23:09,880 » Thank you. Is the applicant present? 290 00:23:11,440 --> 00:23:17,280 » It's Tim Donlin with Don Land Surveying. >> You have anything to add to staff's 291 00:23:16,159 --> 00:23:19,440 report? >> Pardon? 292 00:23:17,760 --> 00:23:25,280 » Anything to add to staff report? >> No. 293 00:23:21,600 --> 00:23:30,400 » Any questions of the applicant? >> Motion to approve first. Second. Motion 294 00:23:28,240 --> 00:23:32,080 made and second. All in favor signify by saying I. 295 00:23:31,440 --> 00:23:37,520 » I. >> Opposed. Motion passes. Thank you. 296 00:23:34,720 --> 00:23:43,440 » Thank you. >> Item number 37, final flat review for 297 00:23:40,240 --> 00:23:49,280 Wild Grass LL subdivision containing three lots on 95.48 298 00:23:46,480 --> 00:23:54,240 acres located off Casper Road in the first voting district. Staff. 299 00:23:52,000 --> 00:23:58,080 » Thank you, Mr. Chairman. Uh this property is located off Cas Casperis 300 00:23:56,320 --> 00:24:03,280 Road as you can see in red on the upper left corner of the screen. 301 00:24:00,400 --> 00:24:08,320 Uh the development consists of 95.48 acres. 302 00:24:05,600 --> 00:24:12,480 Um it will have three lots uh shown in pink. 303 00:24:10,320 --> 00:24:16,960 The lots are accessed by an access easement shown in yellow. 304 00:24:15,360 --> 00:24:20,799 The resource protection standards have been met. 305 00:24:19,120 --> 00:24:25,200 Water will be provided by individual on-site wells. 306 00:24:23,600 --> 00:24:30,480 Waste water will be handled via individual on-site septic systems. 307 00:24:28,640 --> 00:24:34,159 The final plat is consistent with the preliminary plat 308 00:24:32,559 --> 00:24:37,679 and staff recommends approval with standard conditions outlined in the 309 00:24:35,600 --> 00:24:42,360 staff report. >> Thank you. The applicant present. 310 00:24:44,400 --> 00:24:50,720 » Keith Brotherton. I'm the surveyor for the project. I answer any questions. 311 00:24:49,360 --> 00:24:55,919 » Do you have anything to add to staff's reporter? 312 00:24:51,760 --> 00:24:59,120 » Okay. Any questions of the applicant? >> Motion to approve for staff. 313 00:24:58,640 --> 00:25:03,039 » Second. >> Motion made in a second. All in favor 314 00:25:01,039 --> 00:25:05,679 signify by saying I. >> Opposed. 315 00:25:04,320 --> 00:25:10,320 » Motion passes. Thank you. >> Commissioner, can I say one thing, 316 00:25:07,200 --> 00:25:15,840 » sir? Um, there was a an item that was supposed to be added to the non-consent 317 00:25:12,320 --> 00:25:20,880 agenda or the non-aggenda item tonight and I think it failed to make it. The 318 00:25:18,720 --> 00:25:26,400 owner is on his way here and he would like to just voice his opinion on this 319 00:25:23,279 --> 00:25:32,320 issue. Um, he's about 15 minutes away. I didn't know if staff would be willing to 320 00:25:28,960 --> 00:25:38,400 hear him out. Mr. Chairman, and a request from Mr. 321 00:25:35,679 --> 00:25:44,159 Brotherton was not made to our office for the non-aggenda item. I only learned 322 00:25:40,960 --> 00:25:47,760 about it this when Mr. Brotherton came in. We discussed it, but we did not 323 00:25:46,240 --> 00:25:51,679 receive a request for a non-aggenda item. That's why it does not appear on 324 00:25:50,159 --> 00:25:56,760 your agenda and I did not make the announcement earlier. 325 00:25:53,760 --> 00:25:56,760 » Okay. 326 00:25:56,960 --> 00:26:00,960 Is it's something that's coming before us? 327 00:25:59,520 --> 00:26:03,919 » It will be the next meeting. >> It'll be here in your at your March 328 00:26:03,039 --> 00:26:08,559 meeting. Yes. >> Okay. 329 00:26:05,520 --> 00:26:12,400 So, what why why can't you wait till the next meeting? 330 00:26:09,760 --> 00:26:17,679 » Well, the the owner did schedule a meeting. Um, it it was held on January 331 00:26:15,039 --> 00:26:22,720 15th. It was myself, the owner, and Aaron at the meeting. Uh, I know the 332 00:26:20,720 --> 00:26:28,799 owner did follow up with an email after the meeting. Um, and I was not aware 333 00:26:25,919 --> 00:26:32,320 that I needed to send uh another email requesting this to be on as a 334 00:26:30,559 --> 00:26:36,480 non-aggenda item. Um, I know this is very important to 335 00:26:33,919 --> 00:26:39,520 him. I I'm just acting in his place for the moment because he's on his way and 336 00:26:37,760 --> 00:26:43,200 he'd like to make sure he had a moment to speak and I think the way we're 337 00:26:41,919 --> 00:26:46,880 cruising through the agenda. I just didn't want him not to be able to have 338 00:26:44,559 --> 00:26:50,880 that time. >> Um, look, since we haven't been notified 339 00:26:49,120 --> 00:26:55,760 ahead of time and stuff, I think we'll have to wait for for the next meeting. 340 00:26:53,760 --> 00:26:58,880 It's nothing we should handle at this meeting at this time. Okay. 341 00:26:57,360 --> 00:27:02,440 » But I appreciate you coming and telling us. Thank you. 342 00:27:03,200 --> 00:27:14,559 Item number 39, final plat review revised for Fair Farms LLE subdivision 343 00:27:09,600 --> 00:27:21,840 containing three lots on 42 point. >> Oh, I'm sorry. Uh, I'm sorry. Final 344 00:27:18,559 --> 00:27:25,440 thought review for Emerson Ridge LL subdivision containing five lots on 345 00:27:23,919 --> 00:27:32,000 54.91 acres located off of Haley Road in the 346 00:27:28,720 --> 00:27:32,000 fifth voting district. 347 00:27:33,360 --> 00:27:42,279 Go on the right. It's Hill. Oh, 348 00:27:43,360 --> 00:27:46,679 » excuse me. 349 00:27:57,600 --> 00:28:02,080 Yeah, it's still the same project. It's just the street is different. It's a 350 00:28:01,520 --> 00:28:05,919 different >> This is Gozy Hill Road. 351 00:28:03,360 --> 00:28:11,760 » Yeah. >> But didn't we Okay. 352 00:28:08,399 --> 00:28:20,480 I'm sorry. Uh item number 38 is final flat review for Emerson Road LLE 353 00:28:16,399 --> 00:28:25,520 containing five lots on 54.91 acres located off of Goce Hill Road in the 354 00:28:22,480 --> 00:28:30,640 fifth voting district. Staff. 355 00:28:27,440 --> 00:28:36,640 » Thank you, Mr. Chairman, >> the property is located 356 00:28:33,520 --> 00:28:41,600 off of Gocei Hill Road, shown in red on the left side of the screen. The 357 00:28:38,399 --> 00:28:45,520 development totals 54.91 acres in size and contains five lots which are shown 358 00:28:43,440 --> 00:28:49,039 in the lots will be accessed by an access 359 00:28:47,120 --> 00:28:53,120 easement shown in the yellow the center of the screen. Resource protection 360 00:28:51,039 --> 00:28:56,480 standards have been met. Water will be provided by the Milrooft and utility 361 00:28:54,559 --> 00:28:59,679 district and waste water is going to be handled via individual on-site septic 362 00:28:58,320 --> 00:29:03,440 systems which the department of sewage disposal management has approved. This 363 00:29:02,240 --> 00:29:06,880 final plan is consistent with the preliminary plan and staff's approval 364 00:29:05,600 --> 00:29:13,880 the standard conditions outlined in the staff report. 365 00:29:08,880 --> 00:29:13,880 » Thank you. Does the applicant present? 366 00:29:16,720 --> 00:29:23,760 » Good evening. My name is Richard Sullivan. I'm with Svin Engineering. I'm 367 00:29:20,640 --> 00:29:27,360 representing this project. >> Have any questions as far as staff's 368 00:29:25,440 --> 00:29:30,720 report? >> All good. 369 00:29:28,480 --> 00:29:36,240 » Okay. Thank you. Any questions this applicant? 370 00:29:33,279 --> 00:29:39,200 » Motion to approve our staff. >> Motion approved. Do we have a second? 371 00:29:38,559 --> 00:29:43,200 » Second. >> Motion made a second. All in favor 372 00:29:40,960 --> 00:29:48,600 signify by saying I. I. >> Opposed. Motion passes. Thank you. 373 00:29:45,440 --> 00:29:48,600 » Thank you. 374 00:29:48,960 --> 00:29:57,520 Item 39, final plat review revised for Fair Farm 375 00:29:54,080 --> 00:30:04,399 LLE subdivision containing three lots on 42.48 acres located off of Spantown Road 376 00:30:01,520 --> 00:30:08,080 in the fifth voting district. Staff, >> thank you, Mr. Chairman. The property is 377 00:30:06,559 --> 00:30:11,840 located off Spantown Road, which is shown in red on the left side of the 378 00:30:09,600 --> 00:30:16,240 screen. The development totals 42.48 acres in size. It contains five lots, 379 00:30:13,679 --> 00:30:20,080 which will be shown in the pic. They're revising this plat to add two fire 380 00:30:18,399 --> 00:30:24,159 hydrants to reduce the minimum building separation between the lots. The lots 381 00:30:22,559 --> 00:30:27,200 are accessed by a shared access easement shown in the yellow at the center of the 382 00:30:25,279 --> 00:30:30,399 screen. Water's provided by Nolanville College Grove Utility District and 383 00:30:28,960 --> 00:30:33,200 wastewater handled via individual on-site sector systems which the 384 00:30:31,760 --> 00:30:36,799 department of silos management has approved. This final plat's consistent 385 00:30:35,120 --> 00:30:39,840 with plinary plat staff recommends approval. Standard conditions outline 386 00:30:38,240 --> 00:30:44,200 the staff report. >> Thank you. The applicant present. 387 00:30:48,000 --> 00:30:52,480 Hi, Daniel Alman Tquare Engineering. >> Do you have anything to add just to 388 00:30:52,000 --> 00:30:57,840 report? >> No, sir. 389 00:30:53,360 --> 00:31:00,720 » Okay. Any questions as applicant? >> Yes, sir. 390 00:30:59,360 --> 00:31:04,559 » How long have you been growing that beard? 391 00:31:02,720 --> 00:31:09,840 » Uh 15 years. >> Okay. It's impressive. 392 00:31:06,640 --> 00:31:14,240 » It stopped growing like five or six years ago. 393 00:31:11,360 --> 00:31:18,200 » Okay. Okay. Any other questions? 394 00:31:18,640 --> 00:31:23,279 » Motion to approve per staff. >> Second. 395 00:31:20,880 --> 00:31:25,679 » Motion second. All in favor signify by saying I. 396 00:31:24,559 --> 00:31:28,720 » Opposed. >> Motion passes. Thank you. 397 00:31:27,039 --> 00:31:32,679 » Thank you, sir. >> Do you have any other business?