Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
These are YouTube's auto-generated captions, not a human transcript — expect occasional errors, especially with names and technical terms.
[0:00]
we have any other choice. Now, before I
[0:02]
turn this over to the council, Mr.
[0:04]
Fuller, do you have any comments on that
[0:06]
at all with the action that we need to
[0:08]
take?
[0:10]
>> No.
[0:12]
>> Okay. Uh our our attorney Lyall Fer says
[0:15]
we can move forward. Council, you have
[0:18]
this in your packet. You're aware of the
[0:20]
uh situation. Uh, this subject will be
[0:23]
discussed later in this council meeting,
[0:25]
but at this point in time, I would
[0:26]
entertain a motion to take action on
[0:28]
these bids.
[0:31]
>> May I'll make a motion that we at this
[0:33]
moment reject the accepted bids on the
[0:36]
new water tank construction.
[0:39]
>> Reject all of the
[0:40]
>> reject all bids.
[0:41]
>> Is there a second?
[0:43]
>> I'll second it.
[0:44]
>> Any questions, comments? just a comment
[0:48]
and uh if you'll clarify for me and for
[0:50]
our uh community, we're not rejecting
[0:54]
the grant.
[0:56]
>> Uh we're not we're not putting that in
[0:58]
jeopardy. We're we're only rejecting the
[1:01]
bids until we can uh talk about a
[1:05]
different solution.
[1:06]
>> Correct.
[1:07]
>> Thanks for that clarification. Correct.
[1:09]
We we are going to try to do anything
[1:13]
imaginable to retain this grant.
[1:17]
Correct. Thank you, Mr. Dodge. Yep.
[1:21]
>> Okay. I'll uh take a vote to reject all
[1:24]
bids. Terry Larson.
[1:29]
» Hi,
[1:29]
>> Thomas. Chris Larson.
[1:30]
>> Hi.
[1:31]
>> Brent Dodge.
[1:32]
>> Okay, thank you. All bids have been
[1:34]
rejected. Uh we do have a representative
[1:36]
from Keller Engineering. Jared, do you
[1:39]
do we do you do that? Do we do that?
[1:41]
Help us out here. Would you please come
[1:42]
up and tell us the procedure and thanks
[1:46]
for coming down?
[1:48]
>> When you get there, hit the red button.
[1:51]
Good. We've got a new mic that I think
[1:53]
will be much much better if you'll get
[1:56]
it right up there.
[1:57]
>> Okay.
[1:57]
>> Thank you.
[1:58]
first and foremost, Mayor
[2:00]
Council. Thank you for letting us come
[2:01]
down. Uh obviously, I'm not I am not
[2:04]
Coulter. uh he is viewing online. Uh he
[2:08]
could not be here. So he he sends his
[2:10]
regards and his apologies for not being
[2:11]
able to be here. Um but yes, to answer
[2:14]
your question, mayor, yeah, at this
[2:15]
point, the council has made this
[2:17]
decision to reject all bids, so we can
[2:19]
go ahead and and send out notices to all
[2:21]
of the contractors
[2:23]
um to to let them know of that.
[2:26]
>> So you will take care of that then?
[2:27]
>> Yes. Yep.
[2:28]
>> Okay. Um,
[2:31]
I'm I might be getting a tiny bit ahead
[2:33]
of oursel, but
[2:36]
I'm going to hope and assume maybe that
[2:38]
you will let them know that we're
[2:40]
looking at other options to possibly
[2:43]
rebid. Correct?
[2:44]
>> Yep.
[2:44]
>> Okay. Any questions for Jared?
[2:47]
>> That was going to be my question. You
[2:48]
just asked him, so thanks.
[2:49]
>> Okay. Thanks, man. Appreciate that.
[2:51]
>> Thank you.
[2:52]
>> Okay.
[2:55]
Next on the agenda, water line
[2:57]
connection. Robert Miller, 12:05 West
[3:01]
Highway 36.
[3:04]
Bob or Pat, if you don't mind, thanks
[3:06]
for being here. Would welcome. Come on
[3:08]
up and tell us. I'm a little bit uh more
[3:12]
than a little bit. I'm shocked that you
[3:13]
don't have city water. So, uh tell us
[3:17]
the story.
[3:19]
Thanks for coming again.
[3:20]
>> Well, thanks for putting us on the
[3:22]
agenda. Uh we uh were
[3:28]
uh when we moved here about 50 years
[3:32]
ago, we were in the county and we built
[3:36]
our home.
[3:38]
Uh Chris, I don't know if you know where
[3:40]
our house is. Okay. I think everyone
[3:43]
else does. Um so we were in the county
[3:46]
and um we drilled a well
[3:50]
and it was um it was adequate you know
[3:54]
it was adequate for our needs and then a
[3:57]
few years ago we
[3:59]
uh became part of the city so we're now
[4:04]
uh city residents. I don't know how many
[4:06]
years ago that was but we would sure
[4:10]
like to have a city water
[4:12]
>> Bob. So, are you saying that the the
[4:15]
city annexed you and to the city? I
[4:17]
thought you were always in the city.
[4:22]
» I didn't think so, Dan. I thought we
[4:25]
were in the county and then we were
[4:27]
annexed in at a later date.
[4:31]
>> But you never applied for annexation.
[4:34]
>> Not that I remember.
[4:36]
>> Pat, help us out here. She's going to
[4:38]
rescue you, Bob.
[4:38]
>> Oh, good. Here comes it. I'll just step
[4:41]
aside.
[4:43]
>> Sorry.
[4:44]
>> No, thank you.
[4:45]
>> So, when we bought the property, I came
[4:48]
in before we bought it and I was
[4:49]
guaranteed a water hookup and um then
[4:53]
when it came time we built the house and
[4:55]
everything, we were denied. I'm not
[4:58]
going to go into that. But so then we
[5:00]
had no choice but to drill this well.
[5:02]
So, we did. Then Arlene Nash contacted
[5:05]
me 20 years later, 15 years later,
[5:08]
whatever it was, right before she quit,
[5:11]
and she said, "We're going to," I think
[5:13]
it was when they put in the bluff, the
[5:16]
>> Blair River Blair. And she said, "We're
[5:19]
going to annex that and we'll annex you
[5:21]
and you'll be up for city water." And I
[5:23]
said, "I don't want your water." I was
[5:25]
ticked, you know? I mean, I Yeah. So I
[5:30]
said, "No, don't annex me. I don't want
[5:32]
that. So then then we we decided, well,
[5:37]
we've been on a couple of missions and
[5:39]
we're gone. And it would be nice to know
[5:42]
that we don't have to have somebody come
[5:43]
in and check and make sure the wells
[5:45]
running and everything else. It just be
[5:47]
easier on ever the family while we're
[5:50]
gone if we had city water. So then I
[5:54]
came in and and um Linda AOK said,
[5:57]
"Well, I think you're already in the
[5:58]
city." And I said, "We are?" And she
[6:00]
said, "Yeah. and she contacted Chris and
[6:04]
he said, "Yeah, they've been paying city
[6:06]
taxes for quite a while." I said, "Well,
[6:07]
if I'd have known, I'd have been voting
[6:09]
on in the city." So, cuz we haven't ever
[6:12]
voted on the city elections cuz we
[6:14]
thought we were in the county.
[6:16]
>> Interesting. Okay.
[6:17]
>> Yeah. So, it's been kind of a mess. All
[6:19]
a mixup, let's say.
[6:22]
Well, and I don't want to make this too
[6:24]
personal, but I remember exactly when
[6:27]
you came to town and when you built your
[6:28]
house and when you uh uh got your
[6:31]
business financed. So, you've been good
[6:34]
solid members of the community. But,
[6:36]
council, do you have any questions for
[6:38]
the Millers on this situation?
[6:40]
>> I don't have any questions for the
[6:42]
Millers particularly, but do you know
[6:44]
where the where would you hook up or
[6:47]
where do we hook up?
[6:48]
>> We'll have Sean talk about that.
[6:50]
>> Okay. Okay. You're getting to that.
[6:51]
>> Yeah, if that's okay.
[6:52]
>> Okay. Yeah. Perfect.
[6:53]
>> Um, let let's see what Oh, go ahead.
[6:56]
>> Here's why you have a good wife.
[7:00]
>> You know, I I can just stand here and
[7:03]
try to look intelligent. You know,
[7:06]
take over. You're not telling me
[7:08]
something I haven't known for years.
[7:11]
>> Why don't you folks have a chair and we
[7:12]
will discuss this. Okay. Thank you very
[7:14]
much. Sean, would you please come up and
[7:17]
tell us uh uh the logistics and what the
[7:21]
situation is on this?
[7:23]
>> Yes. Uh so the water line uh stops on uh
[7:27]
on on street about uh 600 ft uh east uh
[7:33]
and on the north side of the road from
[7:35]
the Miller property. Um so in order to
[7:39]
get them a a connection, it's not simply
[7:41]
just purchasing a connection and and
[7:43]
doing that. it's actually extending the water line through. Um, with that
[7:49]
being said, if the city were in the move
[7:52]
for a big project, I would like to get
[7:54]
that water line looped all the way down
[7:56]
to the bluffs because the bluffs
[7:58]
actually comes in from the industrial
[7:59]
park and uh cuts through a field and
[8:01]
then that's how it uh connects into that
[8:03]
subdivision. So, it's it's not looped,
[8:04]
it's just a big long dead end. Um,
[8:08]
that's a bigger project probably though
[8:09]
than what we're looking at here. So
[8:11]
again, at the very minimum though, it's
[8:13]
uh 600 ft of water line uh main line
[8:15]
that would have to be extended out uh to
[8:18]
the west.
[8:20]
>> So as far as you know, the existing
[8:23]
water line on Onida Street is a 6-in
[8:25]
line.
[8:26]
>> That's my understanding. Correct.
[8:28]
>> And so help us with the
[8:29]
>> our current code. Uh we're required to
[8:31]
put everything in at least an 8 inch.
[8:33]
That's the minimum.
[8:34]
>> Okay.
[8:36]
And the line runs on the north side of
[8:39]
Highway 34. Correct.
[8:40]
>> That's correct. So, um, even if the line
[8:43]
was there, uh, they'd have to, uh, the
[8:45]
millers would have to bore under the
[8:47]
road, uh, or or work with the state. I'm
[8:48]
sure the state would make them bore it,
[8:50]
uh, in order to get that, uh, across the highway.
[8:54]
>> So, is the city under any obligation to
[8:58]
provide them water? I didn't know about
[9:01]
the annexation issue with Arlene. of
[9:05]
>> typically if someone is annexed into the
[9:07]
city, that's an an issue that is not
[9:11]
ignored,
[9:12]
>> right? This is kind of a an odd
[9:14]
situation. So, I wasn't aware of
[9:16]
everything that happened with how that
[9:17]
went down with the the annexation when
[9:19]
they were brought into the city. Uh that
[9:21]
being said, if we were to um if the
[9:25]
miller were to come to us now and say,
[9:26]
"Hey, I want to build a house here." Uh
[9:28]
we'd say, "Okay, that's fine. Uh you're
[9:30]
going to have to extend the water line,
[9:32]
though." if they were coming in today
[9:34]
and and that would be on them to do that
[9:36]
uh as opposed to the the city.
[9:39]
>> Any questions for Sean?
[9:46]
What's your Sorry, Sean. Stay there.
[9:47]
What's your recommendation? Do you uh
[9:50]
dare tip your toe in the middle of this?
[9:52]
>> Well, like I said, if I had my my
[9:54]
choice, I would like to see that water
[9:56]
line extended anyway. Um, I think it's
[9:59]
uh definitely something that we need to
[10:02]
do in the future uh to say the very
[10:03]
least to get it extended out to all the
[10:05]
way to the Bluff Sloop to get that uh
[10:07]
looped into the the water system.
[10:09]
>> Now, now there's a provision in our code
[10:11]
as I recall that if there is a residence
[10:14]
within a,000 ft of water line, the city
[10:17]
is required to supply them water. Am I
[10:19]
correct in that or
[10:21]
>> they're required to hook up?
[10:22]
>> Okay.
[10:22]
>> Um so we would we would say yeah, you
[10:24]
need to hook up as opposed to drilling a
[10:26]
well. Again, this is kind of an audit
[10:28]
situation where some things have
[10:30]
happened in the past that have made it
[10:31]
so it's not just straightforward.
[10:32]
>> Okay, I understand that and I'm going to
[10:34]
keep going here. So, even though they
[10:36]
are required to hook up, uh I would
[10:39]
assume that they would be subject to the
[10:43]
connection fee.
[10:44]
>> Correct.
[10:44]
>> I mean, okay.
[10:45]
>> Yeah. Any uh new connection, you've got
[10:47]
to pay the connection fee. And so, um
[10:49]
they would be subject sub excuse me,
[10:51]
subject to that at this time. Um and
[10:54]
that would be just the standard
[10:55]
connection fee. um which is I believe
[10:57]
$9,000.
[10:59]
>> Council,
[11:00]
>> my question is for Sean or maybe even
[11:02]
Scott can answer this with no
[11:05]
institutional knowledge. We're talking a
[11:07]
minimum of 600 ft of mainline.
[11:10]
>> Correct.
[11:13]
>> How much would that cost?
[11:15]
>> Scott, come up, please.
[11:18]
>> He's prepared,
[11:19]
>> you know.
[11:24]
All right. So, I talked to Facers about
[11:26]
this
[11:27]
>> um for 600 feet and I just had them do 6
[11:31]
in mainline
[11:33]
and that would be $56,745.
[11:38]
>> Say it again.
[11:40]
>> $56,745.
[11:46]
» That's not a bid. That's just an
[11:47]
estimate. Correct.
[11:48]
>> It's an estimate. Yeah.
[11:50]
>> Okay. That would you
[11:52]
>> That is just your question. Correct.
[11:54]
Yeah. And that's painful.
[12:00]
» Any other questions for Scott?
[12:02]
>> What it would be if it was an 8 in
[12:03]
extended out there? How much that cost
[12:05]
of the pipe? It' probably be
[12:08]
my guess it would be close to $5,000
[12:11]
more for 8 in
[12:16]
spot would how far is it in theory from
[12:21]
potentially where the miller's line
[12:23]
would go from there to Bar River Bluffs?
[12:27]
Is that another I mean 2,000 ft? I mean
[12:30]
yeah just give me
[12:32]
>> I don't think it'd be that far but
[12:36]
probably roughly 1500 feet.
[12:39]
Okay.
[12:40]
>> I mean, this looping project that Sean
[12:42]
describes, I understand it, but that's a huge that's a budget breaker.
[12:47]
That's something we got to plan for uh
[12:50]
out of budget. Um
[12:54]
» well, if we ever plan on right, it would
[12:57]
be best to go with an 8 in line at that
[13:00]
point. But if we're just going to extend
[13:02]
and dead end it, you could go dead end
[13:05]
it and put a fire hydrant on the end as
[13:08]
well. So,
[13:13]
» okay. Any other questions?
[13:14]
>> Bid does include the fire hydrant on the
[13:16]
end as well. So, that would benefit them
[13:19]
as well.
[13:20]
>> Okay. Thank you.
[13:22]
>> I have questions for Lyall.
[13:24]
>> Ly, please come up. Thank you.
[13:29]
My main question is um that maybe Lyall
[13:33]
can answer. I've done a little bit of
[13:34]
research on this, but I'm not sure if
[13:36]
I'm accurate. Idaho code does obligate a
[13:39]
city to provide utilities if when where
[13:43]
feasible.
[13:44]
>> Uh our city code says within 1,000 ft
[13:47]
the resident should has to hook up. I
[13:51]
think 1300 I think.
[13:52]
>> I think it's code 50-301
[13:55]
or 18. I mean that it talks about
[13:58]
utilities that were obligated to provide
[14:01]
sewer and water.
[14:03]
>> If if we have a system, you don't have
[14:06]
to have water and sewer, but if you do,
[14:08]
then you try to serve the people in the
[14:10]
city.
[14:10]
>> My question is, does that code extend to
[14:12]
the fact that then the city should
[14:14]
extend that mainline for this city
[14:16]
resident at our cost?
[14:22]
I I would have said yes before hearing
[14:25]
about the annexation stuff tonight and
[14:27]
I'm not sure what happened with the
[14:29]
annexation
[14:29]
>> and that was new to me but if I throw
[14:32]
that in the mixing bowl in my opinion
[14:35]
when the city was the applicant to annex
[14:38]
them they should have given them water.
[14:41]
Now I realize Mrs. Miller, you said no.
[14:44]
But that's when I would have looked at
[14:46]
you and said, "You're getting it
[14:47]
anyway."
[14:49]
I think the city missed their obligation
[14:51]
then, to be honest.
[14:55]
>> Yeah.
[14:58]
>> And to me that when it when you were the
[15:00]
applicant for annexation, there's some
[15:03]
different rules. If we are the applicant
[15:05]
and we annex, I think then that
[15:08]
obligates us to provide the services we
[15:10]
have.
[15:11]
>> Yeah. to reference what Sean said
[15:13]
earlier. You know, if they were coming
[15:14]
in new with a bare piece of ground and
[15:17]
building a home, the cost would be on
[15:19]
them,
[15:19]
>> right?
[15:20]
>> Properly
[15:20]
>> extend the mainline
[15:21]
>> to extend the mainline, but that's we're
[15:22]
in a different odd odd duck situation.
[15:25]
>> But I'm sure you guys don't want to
[15:27]
spend $56,000.
[15:31]
» I Yeah, I did. I didn't think it would
[15:34]
be that high.
[15:37]
>> Mr.
[15:39]
I would uh maybe just take a
[15:43]
add to what Councilman Thomas has said
[15:45]
and maybe get the attorney to review
[15:47]
this, but there seems to be some
[15:49]
verbiage in uh our municipal code
[15:52]
13.72.020
[15:57]
and it says for any property annex to
[16:00]
the city from and after the adoption of
[16:03]
this ordinance which is number 20115. So
[16:06]
this was dated in 2017.
[16:09]
There's some steps that we need to take.
[16:12]
Number two says this says if the city
[16:15]
annexes property to the city without the
[16:17]
consent, permission or request of the
[16:19]
owner, which would be this case here,
[16:22]
then the owner of said property shall
[16:24]
not be required to transfer shares of
[16:25]
water to the city upon annexation.
[16:28]
However, prior to development, and this
[16:30]
is where it maybe gets a little bit
[16:31]
fuzzy, but I thought this was
[16:33]
interesting. Number seven says this
[16:37]
says there is hereby established a fund
[16:40]
within the budget of the city to be
[16:42]
hereafter named the water acquisition
[16:46]
fund.
[16:47]
Um said fund shall be used to receive
[16:50]
funds from developers of annexed areas
[16:54]
and for the acquisition of water for the
[16:57]
city and its inhabitants and to expand
[17:00]
and upgrade the water system for
[17:02]
extensions to annexed areas.
[17:06]
So,
[17:07]
>> I'm wondering what the balance
[17:08]
>> we have said I'm wonder.
[17:12]
>> You know what the balance is, Kelly?
[17:16]
>> 26,000.
[17:18]
>> Okay. We've only had one applicant for
[17:21]
annexation in my time here and that that
[17:24]
the money that's in that fund would have
[17:25]
been from that applicant.
[17:27]
>> Apparently, there's a money in a bucket
[17:29]
for
[17:30]
>> that would go toward this
[17:35]
Well,
[17:35]
>> so that changes the cost to the
[17:37]
>> I appreciate you bringing that to my
[17:39]
attention, Councilman Dodge, and I'll look at that
[17:43]
>> ordinance in further further detail.
[17:46]
>> Kelly, how difficult would it be to get
[17:49]
the exact amount of money that's in
[17:51]
there? Would you go check on that,
[17:52]
please? Thank you. Thank you, Mr. Dodge,
[17:54]
for bringing that up. It's uh
[17:58]
But you do remember that, Mr. Thomas?
[18:00]
>> Yes.
[18:00]
>> Okay. Okay.
[18:01]
>> I had actually forgotten about the water
[18:03]
acquisition fund. You know, that's been
[18:05]
there forever. Usually not had much in
[18:07]
it and we would use it to buy shares of
[18:09]
secondary water on occasion. But in my
[18:12]
I'm just going to say guys, in my
[18:14]
opinion, I think we ought to approve
[18:15]
this application. The Millers would be
[18:18]
responsible for the connection fee. And
[18:21]
I I think this is under the city
[18:23]
umbrella of obligation to provide a
[18:25]
service to a city resident and we can
[18:27]
use the water acquisition fund to cover
[18:29]
about half the cost of that.
[18:32]
I'm going to it's not in the form of a
[18:35]
motion yet. I'd like to hear what Kelly
[18:37]
comes back with, but I support this.
[18:39]
>> Okay.
[18:40]
>> On those reasons.
[18:40]
>> Thank you for that. If it's all right.
[18:42]
Terry, can you hear us? All right. Do
[18:44]
you do you want to comment on this?
[18:47]
So, I just one question. Um, so the
[18:52]
people speaking from the mic, it's a
[18:53]
little bit broken, but I'm getting most
[18:55]
of it. So, uh, Scott said that the the
[19:00]
bid or the cost to extend
[19:03]
that water line
[19:05]
um, 600 ft would be about what was it
[19:08]
57,000.
[19:09]
>> Yes.
[19:10]
>> Is that is that a bid to extend? Is that
[19:14]
labor and everything or is that just
[19:17]
pipe?
[19:17]
>> And that's 6 inch pipe.
[19:20]
>> It's an estimate and it's all inclusive.
[19:24]
>> Okay, that was I wasn't sure if that was
[19:26]
materials only or if that was materials
[19:28]
and labor. And then um so that answers
[19:32]
that question. I guess
[19:36]
my other my other concern is and I hate
[19:39]
I mean it's it's dumb to hook six to
[19:42]
eight, but I believe we have an
[19:45]
ordinance that says any new mainline has
[19:48]
to be 8 in.
[19:50]
Uh
[19:53]
yeah, we'd be going from 6 to 8, but is
[19:56]
there something that we need to do or
[19:58]
we're in ordinance that any mainline has
[20:01]
to be 8 in? And now we're talking that
[20:03]
the city itself is going to put 6 in in.
[20:06]
You know, maybe that's a question for
[20:08]
Lyall. Seems like a little bit of a
[20:10]
sticky a sticky situation there where
[20:13]
we're requiring developers or stuff like
[20:17]
that to put in eight, but then we like
[20:19]
to put in six. So maybe maybe we could
[20:23]
discuss that or get an answer somewhat
[20:25]
to that.
[20:28]
» Can I can I throw one more in the mix?
[20:31]
We've had two two comments from our
[20:34]
public well from our staff that
[20:37]
mentioned it would be nice to loop it
[20:40]
and I'm wondering if uh if we're
[20:42]
stopping short of of of the of the
[20:46]
recommendation that they're making.
[20:49]
>> You mean to do the loop?
[20:50]
>> To do the loop and and and uh because um
[20:56]
it's it you know it's good, better,
[20:58]
best. In other words, put four tires on
[21:00]
instead of two. But the thing with that
[21:03]
kind of project though, we're talking
[21:06]
multi-million dollars.
[21:07]
>> Well, I I don't know. Is that right?
[21:09]
>> I I would think so.
[21:14]
» Say what?
[21:19]
» Have him come up and
[21:20]
>> Yeah. I don't know.
[21:21]
>> I'm more worried about what the cost
[21:22]
would be to do the whole looping right
[21:24]
now.
[21:24]
>> We just don't know the number on that.
[21:27]
the other water projects we're trying
[21:28]
>> Well, I don't I don't know if it's I was
[21:30]
thinking if it was another $10,000.
[21:32]
>> Oh, no. I didn't Wouldn't we loop it
[21:34]
more?
[21:34]
>> No, no, that that would make sense.
[21:36]
>> I didn't I didn't I did when you said a
[21:39]
couple of million, I was no
[21:42]
>> based upon your place quickly.
[21:43]
>> Based upon Mr. Montgomery's estimate,
[21:47]
you know, multiply that by three or
[21:49]
four. That's a long ways away from two
[21:51]
million bucks.
[21:52]
>> Yeah. But still, it's more than we've
[21:54]
got in our fund. Yeah. Mr. Mickelson,
[21:57]
what figure did you come up with?
[22:00]
71,000.
[22:04]
» Well, I can see some people in our
[22:06]
audience smiling.
[22:08]
>> Okay.
[22:10]
I will now make the motion that we
[22:12]
approve the application for this water
[22:14]
connection with the city extending the
[22:16]
main line following an estimate uh at
[22:20]
our cost and the connection on the
[22:22]
applicant's cost. Is that adequate word
[22:25]
or
[22:25]
>> specify pipe size
[22:28]
>> that the city will adhere to their own
[22:30]
ordinance of an 8 in or pipe mainline?
[22:35]
Does that cover it all?
[22:38]
>> Is there a second?
[22:40]
And I guess I should add them and be the
[22:42]
funds for this project will come from
[22:44]
the water acquisition fund and the
[22:46]
millers will pay
[22:47]
>> and the millers will be obligated for
[22:49]
the normal connection fee. Well, since
[22:52]
we haven't got a second yet, but we
[22:54]
there is something uh Mr. and Mrs.
[22:56]
Miller, you need to be aware of. Again,
[22:59]
the water line is on the north side. You
[23:01]
would be responsible to get it under the
[23:04]
road to your home. So I just hope you
[23:09]
understand that. So
[23:11]
>> you want to make that contingent on them
[23:13]
purchasing the water connection because
[23:15]
there's no reason for us to do it if
[23:16]
they don't purchase.
[23:18]
>> We could do this and she could look at
[23:19]
me again and say what she said before. I
[23:21]
don't want your water.
[23:24]
So that's conditional upon the the
[23:26]
miller's agreement.
[23:27]
>> Do you want to come up?
[23:30]
>> Mr. Mickelson is coming up. I was just
[23:33]
going to tell you we would have to
[23:35]
whenever we decide to do that we'd have
[23:37]
to open the budget because we've never
[23:38]
budgeted for anything coming out of that
[23:40]
fund. But just just so you know that we
[23:42]
can do it.
[23:43]
>> Good point. Thank you for that.
[23:45]
>> And of course that would be before our
[23:47]
next fiscal year starts October 1st. I
[23:50]
don't know how soon this would happen.
[23:52]
Uh but if it's before October 1st, we'd
[23:55]
have to do what Kelly said. Well, and I
[23:57]
guess even after.
[23:58]
>> Yeah. Either way,
[23:59]
>> right? Okay.
[24:01]
>> Okay.
[24:03]
Uh, Taylor, do you have any other
[24:04]
comments? We kind of interrupted you.
[24:08]
>> No, you're you're good. I think all my
[24:10]
questions have been answered.
[24:15]
>> Well, we're looking for a second on Mr.
[24:17]
Thomas's motion.
[24:18]
>> I'll second it.
[24:20]
>> Was that you, Mr. Dodge? I didn't see.
[24:22]
Okay. Uh, Mr. Brent Dodge seconded this
[24:24]
motion. Any questions, comments?
[24:29]
Let me just just clarification. Uh our
[24:33]
attorney, have you looked at that? Is
[24:34]
that the uh proper use of the uh uh of
[24:38]
the ordinance or of the code?
[24:42]
>> I haven't had a chance to review.
[24:44]
>> Do you mean of the use of the fund?
[24:47]
>> Yeah, use of the fund. I mean, that's
[24:48]
it. That's a
[24:50]
>> I just want to make sure that we're
[24:52]
using the code
[24:53]
>> as it water project.
[24:55]
>> Yes,
[24:56]
>> correct. I as I read it would be
[25:01]
use of funds would include to expand and
[25:03]
upgrade the water system for extension
[25:05]
to add.
[25:07]
>> Okay, that almost sounds perfect.
[25:10]
>> Sounds like it matches.
[25:11]
>> Okay.
[25:13]
We have a motion on the table to
[25:16]
approve the uh water line connection.
[25:20]
The city will extend the line with with
[25:24]
an 8 in line
[25:26]
to uh approximately 600 ft which would
[25:30]
allow the millers to connect at their
[25:33]
expense.
[25:35]
All in favor? Mr. Terry Larson.
[25:39]
>> I.
[25:40]
>> Todd Thomas.
[25:41]
>> I.
[25:41]
>> Chris Larson.
[25:42]
>> I.
[25:42]
>> Brent Dodge.
[25:43]
>> I.
[25:43]
>> Okay. Motion carries. I hope that'll
[25:46]
work, folks.
[25:47]
Um,
[25:49]
we will uh move forward with that. Okay.
[25:52]
>> I just hope we can finally stop coming
[25:54]
up with these once in these things that
[25:57]
are once in a blue moon and we've had so
[25:58]
many of these in my time on the council
[26:01]
decisions that were made years ago that
[26:03]
are come back to bite us now. But
[26:05]
>> I think we all agree, Mr. Chris. Thank
[26:07]
you.
[26:09]
Okay. Next on the agenda, uh, east
[26:12]
Enclave subdivision building permit
[26:14]
issuance prior to essential
[26:16]
infrastructure completion and also uh
[26:20]
included in this discussion partial
[26:22]
refund east enclave infrastructure
[26:26]
and rounds uh $826,90.
[26:30]
Sean, would you please come up and and
[26:33]
uh
[26:34]
talk about these? I I think you need to
[26:37]
talk about uh the uh uh building permit
[26:41]
issuance issue and then I might have
[26:43]
Scott Montgomery come up and talk about
[26:45]
the other.
[26:46]
>> Okay. Uh so Enclave East uh subdivision
[26:51]
uh Cameron Rans and Jordan Snedker uh
[26:54]
sent in a request uh to have provisional
[26:58]
uh building permits issued
[27:01]
uh without having all the infrastructure
[27:03]
in. Uh so what's going on is they've uh
[27:07]
made deposits and they've paid what they
[27:09]
need to pay to get the uh electric
[27:12]
company and the gas company and a few
[27:13]
other utilities out. Uh those companies
[27:16]
have not shown up yet uh to complete
[27:18]
that work and so that's pushing them
[27:20]
further out and the people who have
[27:21]
purchased their lots that's pushing them
[27:23]
further out uh as far as being able to
[27:25]
get in there and get work done. Um along
[27:28]
with that, without having that
[27:29]
infrastructure in, they can't put in uh
[27:31]
the city sidewalk.
[27:33]
Uh so with that, they're asking that we
[27:36]
uh grant uh building permits uh
[27:38]
provisional status that uh would allow
[27:41]
people to go in uh people who have
[27:42]
purchased those lots to go in and uh
[27:45]
begin doing work. Um in speaking with
[27:49]
them they've said that uh the utility
[27:51]
companies have expressed that it should
[27:53]
be you know this week or next week uh
[27:56]
that they get work done and uh I haven't
[27:58]
talked to them today so it may have
[27:59]
already begun but uh very soon is what
[28:03]
uh the feeling that I got from them.
[28:08]
>> Any questions for Sean?
[28:18]
Scott, do you want to please come up and
[28:20]
talk about your letter that you wrote
[28:21]
and uh
[28:29]
» you've been out to the site obviously?
[28:31]
>> Yes. Yes, I was out there. Um checked
[28:35]
all the roads, curb, gutter, um
[28:39]
checked all the electrical condo. All
[28:42]
the boxes are there. Conduit's in.
[28:45]
Um I can't remember what else was on the
[28:48]
list, but the the street signs are not
[28:50]
there. That's why they was taken out.
[28:52]
The street signs and the stop signs.
[28:56]
>> Are all the fire hydrants in?
[28:58]
>> Yes.
[28:59]
>> Okay.
[29:01]
Um any questions for Mr. Montgomery?
[29:08]
» Thank you.
[29:12]
So, where we're at on this, I I think
[29:14]
that we're going to have to have two
[29:15]
motions.
[29:17]
Council, I don't know. How do you
[29:21]
want to discuss this? Terry Larson, do
[29:24]
you want to say anything about one of
[29:26]
these requests?
[29:29]
>> Yeah. Um, I didn't So, I didn't realize
[29:33]
that we had two requests. one for the
[29:35]
bond re the partial bond refund and for
[29:38]
the request for building permissive
[29:40]
within the same issue. Um and then next
[29:45]
on the agenda we have the
[29:49]
uh Ralph subdivision
[29:52]
that is kind of in a similar situation
[29:57]
sidewalk-wise. It's not the same
[29:58]
situation but there there's an ask
[30:00]
there. Um, so I think
[30:04]
you know the the relief from the
[30:07]
sidewalks for Enclave and the bonding
[30:11]
for the sidewalks for uh the Rouse
[30:15]
subdivision. Those are two things that
[30:17]
are kind of tied together that I think
[30:20]
the discussion needs to be had with
[30:22]
those two kind of going back and forth
[30:26]
between those two things. But depending
[30:28]
on the decision that's made with the sidewalk issue, I think would
[30:37]
make a difference of possibly the
[30:41]
bonding, the refund of the bonding. Is
[30:43]
that does make sense what I'm saying?
[30:49]
» No.
[30:50]
Well, the council said no, and I'm
[30:53]
saying maybe,
[30:55]
but uh I didn't know if you had a
[30:58]
personal uh issue on one or both of
[31:01]
these.
[31:04]
No, I I don't have a personal issue on
[31:06]
either of them. Um, as far as the
[31:11]
Enclave and the and the Ralph
[31:14]
subdivision, I think whatever the
[31:16]
decision that's made is, it needs to be
[31:20]
basically the same for both parties. I
[31:23]
don't think we refuse one and then allow
[31:25]
one because by ordinance um, you know,
[31:30]
we're not allowed the ordinance requires
[31:32]
the sidewalk to be put in. So if we
[31:35]
allow for the Ralph subdivision to bond
[31:38]
for sidewalks,
[31:40]
then I think we're would be at least at
[31:43]
the obligation to allow the rounds to
[31:46]
bond for sidewalk.
[31:48]
And if they bond decide to bond for
[31:50]
sidewalk, if that decision is made in
[31:52]
that favor, then I would say that the
[31:55]
partial bond refund shouldn't be as much
[31:59]
as it is.
[32:02]
>> Okay. I and I appreciate the input. We will I'm sure the rest of the council
[32:07]
will have some discussion. I if I can
[32:09]
clean this up a little bit, at least try
[32:11]
to clean this up a little bit. On the
[32:12]
back of your page, council, the letter
[32:15]
that Scott Montgomery wrote, our city
[32:17]
clerk, Linda AOK, has given us a
[32:20]
complete review of the total bond amount
[32:24]
and the releases and what the remaining
[32:26]
amount would be. I I do want to say that
[32:30]
this based upon changes to our municipal
[32:33]
code, partial releases will not ever be
[32:37]
an issue ever again. Uh but based upon
[32:41]
this proposal, we still have $444,900
[32:46]
remaining in a letter of credit that
[32:51]
would cover the infrastructure
[32:53]
improvements. and that excludes the 10%
[32:56]
retainage that the city will hold on to
[32:59]
for a year after the entire development
[33:02]
is complete. I don't know if that makes
[33:04]
any difference, but I'm wondering if we
[33:06]
can maybe move forward on one of these
[33:09]
and take these issues one at a time.
[33:11]
>> Can can you can somebody uh
[33:16]
>> there was that much of the bond left? um
[33:20]
that my my understanding was the with
[33:24]
the release of the bond that we all we
[33:26]
would have was
[33:29]
>> the 10%
[33:32]
>> that thought. So if we do still have um
[33:36]
adequate funds to for the you know as a
[33:40]
through the bond to cover the sidewalks
[33:43]
then whatever the
[33:46]
I didn't both ways.
[33:50]
>> No I got I got you T. I think that I
[33:52]
think that we would be covered but Mr.
[33:54]
Dodge you you had a comment please.
[33:56]
>> That that was mainly my comment. I was
[34:00]
curious on when they approached us on
[34:02]
this and when we approved this. I would
[34:05]
like to see a copy of what we did
[34:07]
approve. Um I don't remember it being
[34:10]
this all cart. I I thought it was um
[34:15]
>> mean for the item bonded.
[34:18]
>> Yeah. Yeah. I I don't remember it but I
[34:20]
thought it was um at different phases or
[34:24]
I I don't know. Do you have a copy of
[34:25]
the development agreement?
[34:26]
>> Uh I I do. I I'm referencing a copy of
[34:29]
the development agreement. Um, let me
[34:32]
find that.
[34:35]
Uh, so the development agreement
[34:36]
references that the total bond amount
[34:38]
would be 2,661,000
[34:41]
for the current phase of the
[34:43]
subdivision,
[34:44]
but I'm I'm not aware of a a exhibit or
[34:48]
schedule that breaks it down further
[34:50]
than that. Maybe honor the developers
[34:53]
are, but that was the total amount and
[34:55]
that was how it was listed in the
[34:56]
development agreement.
[34:58]
>> Then what did we agree to? We I know we
[35:00]
agreed to do partial releases, but what
[35:03]
was that agreement like?
[35:09]
» Well, I'm not sure there was a specific
[35:12]
agreement. The request has come to the
[35:14]
council every time they've wanted a
[35:16]
release as part of the consent calendar.
[35:19]
I think we put some sideboards on it is my
[35:22]
>> within the I thought within the
[35:24]
development agreement.
[35:26]
Let me let me look for that further.
[35:28]
Council,
[35:29]
>> yeah, I just I I wor sideboards.
[35:32]
>> Okay. What what I think we ought to do
[35:34]
and council let you tell me if you
[35:35]
disagree. I think we should table this
[35:38]
partial refund request until next
[35:40]
meeting until we get a little more
[35:42]
information on the previous releases. I
[35:45]
don't know how you feel about that.
[35:49]
Well, uh, if I may go ahead, I'm going
[35:52]
to I'm a believer in cutting the Gordian
[35:54]
knot and keeping it simple. I'm okay
[35:58]
with a partial release as requested for
[36:01]
the roadway improvements. You know, our
[36:03]
original agenda had electrical listed
[36:05]
and that was incorrect. We took that off
[36:08]
and the number has been adjusted per Mr.
[36:11]
McGomery's letter, you know, signage,
[36:14]
things like that. So, I'm honestly okay
[36:16]
with this partial release right now. Uh,
[36:20]
but I'm also very much relieved that we
[36:22]
have changed that ordinance so that we
[36:24]
don't keep doing partials.
[36:26]
When you go down to number six and talk
[36:28]
about building permit issuance, at this
[36:30]
point, I'm honestly going to say I'm not
[36:32]
in favor of that until all those
[36:35]
improvements are done. Uh, I don't think
[36:37]
it's fair to the future occupants of the
[36:41]
subdivision to allow building to start
[36:43]
without all the infrastructure in first.
[36:46]
That's just my opinion on that. I think
[36:49]
the other issue of bonding for sidewalks
[36:52]
with Mr. Ralphs is slightly different. I
[36:55]
totally get why you want to wait and do
[36:57]
the concrete after so you don't break it
[36:59]
up and have to redo it. I'm more
[37:02]
comfortable with a with a bonding for
[37:04]
that uh while the construction gets
[37:06]
finished. I wouldn't want Mr. Ralphs to
[37:09]
have a building permit either in this
[37:11]
case without all the infrastructure put
[37:13]
in first aside from the sidewalks.
[37:16]
>> Okay. So, let's stay with cutting the
[37:17]
guardian now. Did you want to make a
[37:19]
motion in regards to the partial refund
[37:21]
release, Mr. Thomas? Let's see where
[37:24]
this goes. Yeah, I'm happy to make a
[37:25]
motion right now just on that topic that
[37:27]
we do grant the partial refund uh
[37:31]
release of bond to on East Enclave for
[37:34]
the adjusted amount of $826,90.
[37:38]
>> Is there a second?
[37:39]
>> I'll second that.
[37:40]
>> Chris Larson has seconded it. Council,
[37:42]
do you want to make any more discussions
[37:44]
about this issue?
[37:46]
>> The I I would like to read the uh
[37:49]
>> Please go ahead.
[37:50]
>> Yeah, the agreement. So the agreement
[37:51]
that we made with Enclave uh subdivision
[37:54]
is this. The city will partially release
[37:58]
any shity provided by the developer as
[38:01]
individual components of the
[38:03]
improvements i.e. water, sewer, road,
[38:06]
sidewalks are completed and installed,
[38:09]
provided that no such partial release
[38:11]
will occur unless and until the
[38:13]
appropriate city official, including the
[38:16]
director of public works, director of
[38:17]
land use, planning, and city engineer,
[38:19]
if applicable, have inspected the
[38:21]
completed improvements and deemed them
[38:23]
acceptable, at least so far as to grant
[38:26]
a partial release of the shy. My my
[38:29]
understanding of that paragraph is that
[38:32]
um it it fits within their application.
[38:37]
>> I think it does.
[38:38]
>> Thank you for that.
[38:40]
Okay. I will call for a vote. All in
[38:42]
favor for Mr. Thomas's motion.
[38:45]
>> I I
[38:46]
>> I
[38:49]
Terry.
[38:51]
>> Uh I
[38:53]
>> Okay, we have a reluctant eye from Terry
[38:55]
Larson. Uh motion motion carries
[38:58]
unanimously. Thank you. Okay, we're back to number six. Uh East
[39:03]
Enclaves building permit issuance prior
[39:06]
to essential infrastructure completion.
[39:16]
» Thank you.
[39:18]
Since we've drugg out the development
[39:20]
agreement,
[39:23]
uh in subp paragraph U as in between T
[39:28]
and V, page 11, it does say no building
[39:31]
permits will be issued prior to
[39:32]
completion of improvements according to
[39:34]
the improvement plan in this agreement.
[39:36]
And so that that topic is addressed in
[39:38]
the development agreement. Now, I think
[39:39]
Cody Ralphs is not to the progress to
[39:43]
the point of having a final development
[39:44]
agreement yet on on that one, but just
[39:48]
thought I'd add that piece of
[39:49]
information to your discussion. And
[39:51]
>> so I think that statement there backs up
[39:53]
what I suggested that we do not approve
[39:55]
conditional building permits until all
[39:57]
the infrastructure improvements are
[39:59]
done. So I'll put that in the form of a
[40:01]
motion.
[40:03]
>> I'll second that.
[40:05]
So your form of the motion is to deny
[40:08]
it.
[40:08]
>> Correct.
[40:08]
>> Okay. Is that you're understanding, Mr.
[40:11]
Dodge? Okay. Any last comments, Terry?
[40:15]
>> I I have a comment. Okay. So, I I don't disagree with with Todd's logic
[40:23]
there that I and I believe that the
[40:26]
sidewalks, you know, that there's a good
[40:28]
chance of breaking those sidewalks up.
[40:30]
But when we pass this ordinance, that
[40:32]
was one of my arguments against passing
[40:34]
this ordinance was that very thing. And
[40:38]
we opted to pass the ordinance with that
[40:41]
still in there. So now we have a
[40:46]
developer that we're looking to grant
[40:49]
permission with a bond to get around
[40:51]
that. So
[40:53]
in my opinion, you know, we've got an
[40:55]
ordinance that I feel like we know had
[40:58]
issues with it and now we're it's not a
[41:03]
variance, but we're now we're going
[41:05]
against what our ordinance is. So,
[41:09]
I'm still on the I'm still on the uh my
[41:15]
stool, I guess, of or my standpoint of
[41:19]
if we grant one, we grant both because
[41:23]
we know
[41:25]
we've known since we passed the
[41:27]
ordinance that this was an issue.
[41:31]
>> This this one this one for Enclave
[41:32]
though is not about sidewalks, right?
[41:34]
It's because the electrical is not the
[41:36]
power company hasn't done their work.
[41:38]
It's because
[41:39]
>> gas hasn't been put in.
[41:41]
>> That's my understanding.
[41:42]
>> That's what I That's what I understand.
[41:45]
>> Terry, we're going to have Mr. Snder
[41:47]
come up.
[41:48]
>> Thanks, Jordan. Hope that's okay.
[41:50]
Council,
[41:52]
>> we do have a motion on the table with a
[41:54]
second.
[41:55]
>> Can you hear me?
[41:57]
>> Can now? Yep.
[41:58]
>> Thank you. Um, just to clarify, um, our
[42:01]
hands are tied based off of the, uh,
[42:03]
power company and the gas company. We've
[42:06]
paid our fee for them to come out.
[42:08]
They've just got a backlog. And, in
[42:10]
fact, they've showed up today. They've
[42:12]
started. And so, um, I talked to them
[42:15]
today. They said within this week or
[42:17]
next week, they would be completed. Um,
[42:20]
we've just got some people that are
[42:22]
wanting to start, you know, breaking
[42:23]
down before snowfalls, but our hands are
[42:26]
tied as the developer that we I mean,
[42:28]
it's a monopoly that Rocky Mountain
[42:30]
Power has. We've paid their fee. We've
[42:32]
been compliant. Um,
[42:35]
regarding we're just they're just
[42:37]
wanting to get started. Um, and so it's
[42:40]
within a week or, you know, 10 days from
[42:43]
them being completed and then it would
[42:45]
be the sidewalk. the sidewalk can't go
[42:47]
in until after those um uh improvements
[42:50]
are installed. But then you go back to
[42:53]
you put this sidewalks in and they're
[42:55]
going to get brack crack cracked, broken
[42:56]
and you know um but we're willing to do that and
[43:01]
we're going to do that but um we're just
[43:04]
asking for this variance or this you
[43:06]
know conditional approval for lots so
[43:08]
that we can continue progressing without
[43:11]
getting held up by uh a monopolistic
[43:14]
entity such as Rocky Mountain Power.
[43:17]
But they're on site. They are on site
[43:19]
today. They're on all this week. So, I'd
[43:21]
say within, you know, 10 days.
[43:24]
You guys have any questions for me?
[43:27]
>> Thank you, Mr. Senator. Go ahead, Chris.
[43:29]
>> I was just going to ask Jordan. Jordan,
[43:30]
just your opinion on this, but it was
[43:32]
something I was thinking was I I
[43:35]
understand that Rocky Mountain Power is
[43:37]
holding you up and whatever else, but
[43:39]
why is that the city's problem?
[43:42]
That's kind of my thought when I that
[43:45]
that's not the city's problem at all.
[43:47]
this is our problem as part of the risk
[43:50]
that we um took on when we decided to do
[43:52]
this project. Um but we're just trying
[43:55]
to provide a service to the people of
[43:59]
Preston so that they can continue moving
[44:01]
forward. And so we're just asking for
[44:04]
this um consideration to to not delay
[44:08]
things as you know fall's coming and
[44:10]
winter's coming.
[44:11]
>> You know, Mr. Snediger and I appreciate
[44:13]
your application and and you asking the
[44:16]
question and and I ditto what you said
[44:19]
and that is is that we're trying to
[44:20]
provide a service to the city or the
[44:22]
municipality to make sure that everybody
[44:25]
fits within the code. And so we don't
[44:29]
doubt your integrity or what you're
[44:31]
trying to do, but we as council members
[44:35]
and as this board um we have to keep
[44:38]
order. And so uh that's um and as such
[44:43]
the code specifically says no building
[44:46]
permit shall be granted until curb
[44:48]
gutter and railway of a phase of a m a
[44:52]
major subdivision are completed. That's
[44:53]
code 16.28.020.
[44:57]
And your comment in regards to the um
[45:01]
cracked sidewalks and those things that
[45:05]
um maybe you think are ridiculous. We've
[45:08]
made a provision for that. Uh it says to
[45:11]
the extent necessary to accommodate the
[45:14]
sidewalk, curb, and gutter when
[45:16]
determined that it is technically or
[45:18]
otherwise infeasible to comply such as
[45:21]
where there is a lack of public
[45:22]
rightway, extreme uh topographical
[45:24]
conditions, uh presence of a fire
[45:27]
hydrant, mailboxes, those kinds of
[45:29]
things. We've made a provision for those
[45:31]
sidewalks. So, uh, if if you feel like
[45:35]
there's an extenduating circumstance,
[45:38]
uh, you can make a a a request for those
[45:42]
sidewalks not to go in.
[45:43]
>> But for you to say that, um, the city is
[45:48]
not um is not builder friendly, I think
[45:52]
is a mischaracterization.
[45:54]
I think you're putting words in my
[45:56]
mouth. Okay, Councilman died. I didn't
[45:58]
say that you're not builder friendly at
[45:59]
all.
[46:01]
Thank you for your comments. You know,
[46:02]
>> Jordan, I'm I'm very comfortable with
[46:04]
the sidewalks coming later. Sure.
[46:07]
>> I get you don't want to, you know, do it
[46:09]
twice. And we've done that several times
[46:12]
either with a partial bond or just a
[46:14]
waiver, a variance. I recall one
[46:16]
instance with a homeowner where they
[46:18]
were required, they had to do
[46:19]
asphaltting. Well, it was December, they
[46:21]
couldn't get hot mix and so we gave an
[46:24]
extended, you know, time to do it later.
[46:26]
So, I don't want you to worry about the
[46:28]
sidewalks.
[46:29]
>> Okay.
[46:30]
There's still a method there.
[46:32]
>> Sure.
[46:33]
>> The signs are purchased, but we can't
[46:34]
put the signs in before the concrete.
[46:37]
Um, it's just uh we're just waiting on
[46:39]
the the big players to install their work.
[46:42]
>> I get it.
[46:43]
>> So, thank you for coming up, Jordan.
[46:45]
Appreciate you being here. Okay, we have
[46:47]
a motion on the table to uh deny this
[46:50]
request number six. Uh, I'm going to do
[46:53]
a roll call vote. Mr. Dodge.
[46:55]
>> Hi.
[46:56]
>> Uh, Terry Larson.
[46:59]
>> Nay.
[47:01]
>> Was that May?
[47:02]
>> Tell what it said.
[47:04]
>> Nay.
[47:05]
>> May is in no. Chris Larson.
[47:07]
>> I.
[47:08]
>> Uh, Todd Thomas.
[47:10]
>> I.
[47:11]
>> Okay. Motion carries 3 to one. Thank
[47:13]
you, Terry Larson. Thank you, Mr. Sneder
[47:16]
and Mr. Rounds. Okay. Number seven,
[47:19]
general obligation revenue bond on
[47:21]
November ballot for 2 million gallon
[47:25]
water storage tank.
[47:29]
I guess this is where I will
[47:31]
editorialize briefly
[47:34]
based upon the fact that we do have a
[47:37]
grant for $3,750,000
[47:42]
as well as the fact that the city of
[47:43]
Preston does need additional water
[47:45]
storage. We have about four and a half
[47:48]
million gallons of water storage
[47:50]
currently and an extra two million
[47:52]
gallon would do uh uh significantly
[47:56]
increase our uh holdings of water and
[47:59]
based upon the fact that our city
[48:01]
engineering essentially has been
[48:03]
completed on this project. Is that
[48:05]
correct Mr. Jared Richens? Okay. The
[48:09]
council has decided that we would like
[48:12]
to put the qu the request on the ballot
[48:16]
to have the citizens vote in the
[48:19]
November election to approve a revenue
[48:23]
bond for $2,500,000.
[48:27]
Now, this is a situation that would
[48:30]
require
[48:32]
uh a majority vote only.
[48:35]
Also, this is a situation. It is a
[48:37]
revenue bond.
[48:40]
It will have no bearing whatsoever on
[48:42]
individuals property taxes. It will not
[48:45]
affect the property tax on your home or
[48:47]
improvements or property, bare land,
[48:50]
development, whatever. This is purely a
[48:53]
revenue bond. I want to give a brief
[48:56]
history. We currently have a revenue
[48:59]
bond in place that was incurred in 1998,
[49:04]
a 30-year bond for in excess of $5.4
[49:08]
million.
[49:10]
That was to 4 million was to improve
[49:13]
lines and water meters. $1.4 million was
[49:17]
for a new water tank.
[49:19]
This bond was refinanced
[49:22]
uh by the council in the year 2020.
[49:27]
That 5.3 million, 5.4 million was paid
[49:31]
down to 2.8 million.
[49:34]
The council was able to refinance this
[49:36]
at a fixed interest rate of 1.97%.
[49:41]
This uh obligation balance is about
[49:46]
uh $500,000.
[49:49]
And this 30-year bond will be totally
[49:52]
paid off on May 15, 2028.
[49:57]
So the fact of the matter is is this
[49:59]
proposed $2.5 million item that will be
[50:02]
on the november ballot if the council so
[50:05]
chooses will actually be less of a debt
[50:09]
service obligation than we are currently
[50:12]
paying. Uh council, help me here. any uh
[50:15]
information that you want to discuss for
[50:18]
the public?
[50:23]
» Um what I what I would just add is that
[50:26]
one of our biggest issues that we have
[50:29]
as a city with the um spring that we get
[50:32]
our water from is that storage capacity.
[50:36]
uh until we were surprised with the
[50:39]
amount of the bids, we had every
[50:41]
intention of moving forward with a 2
[50:44]
milli extra holding for the city. Um if
[50:48]
that water does not get held that we
[50:50]
already have right to and we fill up our
[50:53]
current tanks, it just flows out into
[50:56]
foster, right? So, what we're talking
[50:58]
about here is the ability to hang on to
[51:00]
more of our water that can then be used
[51:03]
in situations like this summer where we
[51:06]
had a pretty major drought. Um, from all
[51:09]
things that I've been reading, it sounds
[51:11]
like we might be in for another drought
[51:13]
this winter um potentially. But what this tank does is it gives us the
[51:20]
ability to have 2 million more gallons
[51:22]
in holding for circumstances such as
[51:25]
this. the fact that um we're able to do
[51:29]
this without an increase to the water
[51:32]
bill specifically, and I don't want to
[51:35]
get that confused with a sewer bill and
[51:37]
a water bill. I know that we get you get
[51:39]
that at the same time, but there
[51:41]
wouldn't be an increase to the water
[51:42]
bill, which this has to come out of
[51:44]
those funds. So, being able to move
[51:48]
forward with this, I I would hope um
[51:51]
getting it on the on the ballot. I'm
[51:54]
hoping that the citizens would see the need that the city has for this and
[51:59]
be able to also understand that we're
[52:00]
not talking about increasing that water
[52:02]
bill. We're talking about the funds that
[52:04]
we're already getting in every month
[52:06]
being able to continue to pay for it,
[52:08]
but we just can't build the tank without
[52:10]
that approval from the public. That's
[52:13]
the that's the big thing. And so that's what we'll hopefully be asking
[52:18]
for uh on that November election. But
[52:20]
that's my that's me uh editorializing on
[52:24]
that.
[52:25]
>> Well, I appreciate that, Chris Larson.
[52:27]
Uh to give your perspective, u uh to Mr.
[52:32]
Thomas, do you have his
[52:33]
>> Yeah, my thoughts on this. Uh I'm I'm
[52:35]
comfortable with this decision. I think
[52:37]
this water tank is extremely important
[52:39]
to us. That's going to do uh have a
[52:43]
great deal of benefit to us until the
[52:46]
lucky day comes that we find another
[52:48]
source of water.
[52:50]
Uh,
[52:52]
so
[52:53]
I would encourage this to be on the
[52:56]
November ballot. I am a big believer in
[52:58]
ballot initiatives. No matter what the
[53:00]
topic, even if I vote no on it or I vote
[53:04]
yes on it, I'm a big believer in the
[53:06]
Republican form of government of one
[53:08]
person, one vote. And a ballot
[53:10]
initiative like this gives the voter
[53:12]
that chance. But then the responsibility
[53:15]
needs will rest not just on the council
[53:18]
shoulders. it'll rest on the city
[53:20]
residents. That's where it should be.
[53:23]
Um, they need to say yes or no. And what
[53:26]
they're basically doing with a yes vote,
[53:28]
you're giving the council and the mayor
[53:30]
permission to go borrow that money to
[53:33]
build this project. If they say no, we
[53:36]
won't be able to build it. And then
[53:38]
you're running the risk of running out
[53:40]
of water possibly. I like the election
[53:43]
option much much better than judicial
[53:46]
confirmation.
[53:47]
Uh we've done judicial confirmation
[53:49]
twice. Once for the water meters in 98.
[53:54]
Uh and I think that turned out to be a
[53:56]
good move for the city. And then we did
[53:59]
it for the sewer plant.
[54:01]
We chose to hold an election like this
[54:04]
for bonding about six, seven years ago
[54:07]
uh
[54:09]
to raise the money for a new water
[54:12]
mainline from the tank into town if you
[54:15]
can recall that. and it went very
[54:17]
successful. We had a 70 something%
[54:20]
approval
[54:22]
uh with the city and we appreciated
[54:23]
that. The job of the council now is to
[54:26]
educate and inform the voters so they
[54:28]
make the right choice. So I'm all in
[54:30]
favor of this. Mr. Dodge, have you got
[54:32]
any comments on this, please?
[54:34]
>> It was um we started this process with
[54:38]
uh the bond. Uh I remember the day up at
[54:43]
the capital all of us uh council member
[54:45]
including the mayor met with uh uh
[54:49]
congressman's uh office and uh this is
[54:53]
where the seed was planted where we
[54:56]
needed a water tank and uh and fast
[55:00]
forward
[55:02]
it's got to be 5 years ago and uh fast
[55:07]
forward we thought that we had enough
[55:09]
money to build a water tank.
[55:12]
And uh the inflation has just uh uh
[55:17]
caught us off guard. And so with that
[55:20]
being said,
[55:22]
we essentially have uh we get to make a
[55:26]
decision. And um so I I want the
[55:30]
citizens to think of it this way.
[55:32]
Basically, um, we're we're going to get
[55:38]
a a new an additional water tank for 50
[55:42]
cents on the dollar.
[55:44]
Um, if we decide, hey, we don't want to
[55:48]
bond for it, we don't want we're not
[55:50]
going to bond for it, we're not going to
[55:52]
pay that money, uh, then we'll just send
[55:55]
back the $3.7 million.
[55:58]
And, uh, at a future date when we do
[56:01]
need another water tank, the price tag
[56:04]
of that, we'll have to pay full price.
[56:08]
And so in my mind's eye, uh missing out
[56:11]
on that opportunity
[56:14]
uh would be um would not be in our best
[56:17]
interest. Who doesn't want to go uh
[56:20]
shopping
[56:22]
uh with a uh and shop at uh on the
[56:26]
clearance rack at uh 50% discount.
[56:30]
>> Thank you, Mr. Dodge. Terry Larson, you
[56:32]
got any comments on this?
[56:34]
Um I just I I do echo everything that's
[56:37]
been said. Um and just you know
[56:41]
reflecting on it when we when we asked
[56:45]
for this grant and was given basically
[56:48]
given the grant and through the process.
[56:51]
Uh the exact same thing has happened
[56:53]
with with what happened with the
[56:54]
wastewater treatment plant. From the
[56:56]
time we started the process to the time
[57:00]
the rubber hit the road we doubled in
[57:02]
price. Well,
[57:05]
you know, like Brent said, 50 cents on
[57:07]
the dollar is really good. And I would
[57:08]
say it was at probably even more than 50
[57:11]
cents on the dollar that we're getting.
[57:13]
And uh the need for the water is not
[57:18]
going to lessen. The cost of the tank is
[57:21]
going to increase the longer we kick it
[57:23]
down the road. So, you know, next time
[57:26]
another council, another mayor, whatever
[57:28]
it is, goes to do the exact same thing,
[57:32]
it's not going to be 6 to7 million. It's
[57:35]
going to be 12 $15 million probably with
[57:40]
not even $3.7 million worth of grant to
[57:42]
match it. So, you know, I I I think it's
[57:46]
foolish that if we that we don't move
[57:48]
forward with this and and I agree
[57:51]
wholeheartedly it's at the at the
[57:53]
citizens discretion of whether we do it
[57:55]
or not and and I agree it needs to go to
[57:58]
them to decide.
[58:02]
>> Thank you, Mr. Terry Larson. Mr. Thomas,
[58:05]
you had another comment. My last thought
[58:06]
is, you know, in the whole course of
[58:08]
this wastewater plant, many comments
[58:10]
have been made, uh, like, why didn't you
[58:13]
guys do this 10 years ago? It'd have
[58:15]
been cheaper. Well, it might have been.
[58:17]
Uh, but 10 years ago, if we had started
[58:20]
the wastewater thing, we might not have
[58:22]
got the grant funding we got this time,
[58:24]
and we might have had a whole different
[58:25]
interest rate. So, it could all turn out
[58:28]
to be sixes.
[58:30]
That we will never know. But, this is
[58:32]
the second chance. Now, let's not kick
[58:35]
this down the road. Let's do it when
[58:37]
it's cheaper so that in 5 years we try
[58:40]
to do it and we're not told the same
[58:42]
thing. Why didn't you guys do it 5 years
[58:44]
ago when it was cheaper? Uh, so that's
[58:47]
my thoughts on it.
[58:51]
I
[58:51]
>> think we might have lost Mr. Terry.
[58:55]
>> Linda, can you see if you can get Terry
[58:57]
Larson on the phone uh
[58:59]
>> before we vote?
[59:01]
>> Correct.
[59:02]
Uh,
[59:04]
she's going to grab her phone.
[59:06]
>> Um, the other thing I'll say, you know,
[59:07]
did uh I'm kind of assuming we're going
[59:11]
to approve to put this on the ballot. We
[59:13]
then have to meet a deadline of wording
[59:15]
for the ballot. Between now and then,
[59:18]
please everyone keep an eye on us. We'll
[59:21]
be having some town halls and some
[59:22]
education where people can come and look
[59:26]
at pictures and diagrams and information
[59:29]
and education. Please keep an eye out
[59:31]
for that information from the city so
[59:34]
that you make an informed vote.
[59:36]
Kelly, please come up. Kelly,
[59:43]
» I was just going to say when we applied
[59:45]
for this grant, we applied for like I I
[59:48]
might be wrong, but like 5.9 million and
[59:51]
the 3.7 was all they give us. So, we
[59:54]
didn't
[59:56]
not plan for how much the water tank was
[59:58]
going to be. We're just didn't get the
[1:00:00]
money.
[1:00:00]
>> Good point.
[1:00:01]
>> Thank you for the update. Now, let me
[1:00:02]
just uh give some additional information
[1:00:05]
to the public and the council. Uh we
[1:00:09]
have asked our engineers to rebid this
[1:00:13]
as quick as possible under the
[1:00:15]
assumption that the voters will act in
[1:00:19]
the affirmative for this $2.5 million.
[1:00:22]
But this next bid process
[1:00:25]
will include a provision and Jared can
[1:00:28]
you come up briefly to basically state
[1:00:32]
if the bids come in way high again there
[1:00:36]
will be a secondary aspect to the bid to
[1:00:39]
give us another figure if we only can go
[1:00:41]
do a million and a half gallon tank. Uh
[1:00:45]
so Jared give us enlighten us a little
[1:00:47]
bit about that please.
[1:00:48]
>> Yeah. Yep. Um, so as as the mayor
[1:00:51]
mentions, we've looked at uh what
[1:00:54]
potentially could be the the city's in
[1:00:56]
the city's best interest for moving
[1:00:58]
forward. Obviously, the city has made an
[1:01:00]
investment in the design of this tank.
[1:01:02]
The city needs this tank. The city wants
[1:01:04]
to see this tank move forward. You have
[1:01:06]
the the almost $4 million in grant
[1:01:08]
wanting to see that put to to beneficial
[1:01:10]
use. Um so as we went back and took a
[1:01:14]
look at things uh really we saw kind of
[1:01:17]
three options for moving forward um the
[1:01:20]
first option as has been discussed would
[1:01:23]
to do a a bond election or or judicial
[1:01:26]
confirmation obtain that authority to
[1:01:28]
bond u to make up the the shortfall in
[1:01:31]
the funding um and still only target a 2
[1:01:34]
million gallon tank. That would be
[1:01:36]
option number one. Um, option number two
[1:01:40]
to hedge our bets. Um, it would take a
[1:01:44]
little bit of of re-engineering.
[1:01:45]
Currently, the the tank is designed as a 2 million gallon tank. Um, but we
[1:01:50]
could go back and re-engineer that to be
[1:01:53]
a 1.5 million gallon tank uh with an
[1:01:56]
adder to then go to 2 million gallons if
[1:02:00]
sufficient construction monies are
[1:02:02]
available. Um so that would take some additional engineering work to to
[1:02:07]
redo. Uh there are some options as we
[1:02:11]
were looking at that to make that work
[1:02:13]
within the current engineering contract.
[1:02:16]
Um to cover that additional engineering
[1:02:18]
work. Uh but that one would be one
[1:02:20]
option. Um, and then the third option
[1:02:24]
would be to to forego the bonds to look
[1:02:28]
at reducing the size of the tank and
[1:02:31]
then to to move forward with a a smaller
[1:02:33]
tank. Um, something that the city could
[1:02:35]
potentially afford with the the funding
[1:02:37]
currently available.
[1:02:39]
>> I don't know if you have these numbers
[1:02:40]
memorized.
[1:02:42]
2 million gallons. How many days does
[1:02:44]
that give the city of Preston?
[1:02:47]
>> I I do.
[1:02:48]
>> Maybe Scott would give us a better idea
[1:02:50]
or Brian even.
[1:02:52]
We'll do how many we have currently
[1:02:54]
>> based on the current usage. If we base
[1:02:56]
it on the waste water flows coming to
[1:02:58]
the treatment plant, it be six to 10
[1:03:00]
days
[1:03:01]
>> of emergency use
[1:03:03]
>> of the current usage of the city as
[1:03:05]
right
[1:03:05]
>> an emergency I'm sure you can get people
[1:03:07]
to ration right
[1:03:08]
>> and you can extend that even longer but
[1:03:10]
as current usage 2 million would be
[1:03:12]
about
[1:03:13]
>> because I think currently what's our
[1:03:15]
storage capacity 6 million four and a
[1:03:18]
half four and a half so we're we're
[1:03:20]
going up by 50% and it you're basically
[1:03:23]
saying in an emergency it would add at
[1:03:25]
least a week
[1:03:27]
of water to the houses while we get the
[1:03:30]
thing fixed or whatever. Okay.
[1:03:32]
>> Yeah.
[1:03:32]
>> Thank you.
[1:03:33]
>> Obviously, what what's measured at the
[1:03:34]
treatment plant doesn't account for
[1:03:36]
outdoor water use, but as as Brian
[1:03:38]
pointed out in an emergency, hopefully
[1:03:41]
you would cretail that outdoor use and only provide what's needed for the
[1:03:45]
home.
[1:03:46]
And the idea I think council is if we
[1:03:50]
approve this,
[1:03:53]
we're going to rebid this ASAP because
[1:03:55]
we don't have to accept the bid for 60
[1:03:57]
days and that will put us past the
[1:04:00]
November election. In other words, we're
[1:04:02]
doing we want to do what we can to not
[1:04:05]
have inflation rip our rip the cost of
[1:04:08]
this. So it's insurmountable.
[1:04:11]
>> Is that is that correct?
[1:04:12]
>> That's correct.
[1:04:12]
>> So you you're thinking September maybe
[1:04:14]
we can rebid this? Yeah, we would we
[1:04:16]
would get the bidding scheduled um you
[1:04:19]
know, let's say September, typically a
[1:04:21]
three to four week bid process. Um so
[1:04:24]
that would mean the bids come in
[1:04:25]
sometime in October. Uh the the election
[1:04:28]
would be in November, but then as the
[1:04:30]
mayor pointed out, um there's a
[1:04:32]
requirement that those bids that come in October are then able to be held for
[1:04:37]
60 days. Um, and so that means the city
[1:04:40]
could respond to those biders um, as
[1:04:43]
late as, you know, sometime in November,
[1:04:46]
so early December.
[1:04:48]
>> Thank you, Jared. Any questions for him?
[1:04:50]
>> Thanks, B.
[1:04:51]
>> I was going to say that does that would
[1:04:53]
still keep us on target for starting
[1:04:55]
construction hopefully next spring.
[1:04:59]
>> Uh, yeah, depending on their specific
[1:05:01]
schedules. Yeah.
[1:05:03]
>> Yeah.
[1:05:03]
>> So, potentially Earth.
[1:05:05]
>> We're trying not to lose time. We're
[1:05:06]
trying to do all that all that stuff.
[1:05:08]
purpose behind it. So, just wanted to
[1:05:10]
make that clear.
[1:05:11]
>> So, this is an action item. We need to
[1:05:13]
uh get approval for the general
[1:05:17]
obligation bond, Mr. Fer. Right. And
[1:05:19]
then we do the ordinance. Help us out
[1:05:21]
here, please.
[1:05:25]
» Yeah, there's an ordinance in the in the
[1:05:27]
packet that references potential ballot
[1:05:30]
language, references the u the amount of
[1:05:33]
the two up to 2.5 million. uh has the
[1:05:37]
information that that we had as of when
[1:05:39]
we put this together uh last week. So,
[1:05:42]
in terms of uh motions, uh mayor, I I
[1:05:46]
think you could uh take a entertain a
[1:05:48]
vote or motion to have this uh placed on
[1:05:52]
the ballot and then have a maybe a
[1:05:55]
separate motion to introduce the
[1:05:57]
ordinance and and go from there. Thank
[1:05:59]
you. Okay. Okay, I'll entertain a motion
[1:06:01]
to uh place a general obligation revenue
[1:06:04]
bond on the November ballot for a 2
[1:06:07]
milliongal water storage tank.
[1:06:09]
>> I'll make a motion that we uh place a
[1:06:12]
general obligation revenue bond on the
[1:06:14]
November ballot for a 2 milli water
[1:06:16]
storage tank.
[1:06:16]
>> Thank you, Chris Larson. Is there a
[1:06:18]
second?
[1:06:18]
>> I'll second it.
[1:06:19]
>> Thank you, Mr. Thomas. All in favor?
[1:06:23]
I I
[1:06:25]
>> I
[1:06:26]
>> Terry.
[1:06:29]
Uh Terry, are you there? Let me
[1:06:40]
» nice.
[1:06:41]
>> Okay, we will pass the motion to the
[1:06:50]
» Okay, can you hear? Okay, Terry.
[1:06:53]
>> Yeah, I apologize. I'm going through the
[1:06:56]
rolling hills, Oregon, and that keeps
[1:06:57]
dropping my service.
[1:07:00]
>> Okay, we we're voting on the motion to
[1:07:02]
put this on the ballot. Terry, did you
[1:07:04]
want to vote?
[1:07:08]
» Pardon?
[1:07:10]
>> Do you want to vote on the motion to put
[1:07:12]
this on the ballot?
[1:07:14]
>> Yes.
[1:07:15]
>> Okay. Motion carries. Four to nothing.
[1:07:17]
Thank you, Terry Larson. Okay. Next is
[1:07:19]
we need to have a resolution for the
[1:07:22]
general obligation revenue bond which
[1:07:24]
has been prepared. Would someone like to
[1:07:27]
introduce this uh ordinance?
[1:07:31]
>> Mayor, I'll make the motion that we
[1:07:32]
introduce ordinance 2026-7 for a general
[1:07:35]
obligation revenue bond.
[1:07:42]
» Instruct our city clerk to read the
[1:07:43]
ordinance in summary and wave the
[1:07:45]
reading of three consecutive days.
[1:07:48]
Is there a second?
[1:07:50]
>> I'll second it.
[1:07:51]
>> Thank you. Uh, Chris Larson. Roll call
[1:07:53]
vote. Terry Larson.
[1:07:57]
» Hi.
[1:07:58]
>> Todd Thomas.
[1:07:58]
>> Hi.
[1:07:59]
>> Rand Dodge.
[1:08:00]
>> Hi.
[1:08:00]
>> Chris Larson.
[1:08:01]
>> Hi.
[1:08:02]
>> Thank you. Linda, can you read this in
[1:08:04]
summary, please?
[1:08:16]
An ordinance of the city council of the
[1:08:18]
city of Preston, Idaho, providing for
[1:08:20]
and calling a special election at which
[1:08:23]
there shall be submitted to the electors
[1:08:25]
qualified to vote thereon the question
[1:08:27]
of issuing the city's water revenue
[1:08:29]
bonds for the purpose of financing in
[1:08:32]
part the cost of renovation,
[1:08:34]
improvement, upgrading, and betterment
[1:08:36]
of the city's water system, including
[1:08:38]
construction of a new water storage
[1:08:40]
tank. providing details in connection
[1:08:42]
where or with
[1:08:44]
and of the election of the question and
[1:08:46]
also providing for publication by
[1:08:48]
summary dispensing with reading on three
[1:08:50]
separate days and providing an effective
[1:08:53]
date.
[1:08:53]
>> Thank you, Linda AOK. Ordinance 2026-7
[1:08:57]
was read once in summary by city clerk
[1:09:00]
AOK.
[1:09:03]
Does someone want to make a motion to
[1:09:05]
approve ordinance 2026-7? Mayor, I'll
[1:09:08]
make a motion that we approve ordinance
[1:09:09]
2026-7.
[1:09:11]
>> Is there a second?
[1:09:12]
>> Thank you, Chris Larson. Uh, roll call
[1:09:14]
vote. Terry Larson,
[1:09:17]
>> I.
[1:09:17]
>> Todd Thomas,
[1:09:18]
>> hi.
[1:09:18]
>> Brent Dodge,
[1:09:19]
>> hi.
[1:09:20]
>> Chris Larson,
[1:09:20]
>> hi.
[1:09:21]
>> Thank you. Thanks for getting back to
[1:09:23]
us, Terry. Thank you, council. I think
[1:09:25]
this is a a good move and and our
[1:09:28]
engineers. Thank you, Jared, for being
[1:09:30]
here and giving us a little further
[1:09:31]
explanation. Okay, we're on number nine.
[1:09:35]
Amendment to owner consultant agreement
[1:09:38]
for the ch children pedestrian safety
[1:09:41]
ADA ramp. Scott, did you want to visit
[1:09:44]
with that us about that or Jared, do you
[1:09:46]
want to talk about that at all?
[1:09:48]
>> Uh Lyall is Nope.
[1:09:52]
>> Come on up, Jared. This is just a change
[1:09:54]
order, I assume.
[1:09:58]
Shouldn't uh shouldn't let Scott off the
[1:09:59]
hook. Um so what this is uh this is a I
[1:10:04]
guess a good problem to have. Um in this
[1:10:06]
case uh the sidewalk project that the
[1:10:09]
city received a grant for uh bids came
[1:10:11]
in very favorably. Um and so the city
[1:10:15]
was able to do additional work. Um so
[1:10:19]
this amendment actually amends our
[1:10:21]
contract to do additional design and
[1:10:23]
then also construction um administration
[1:10:26]
services associated with that sidewalk
[1:10:29]
project. Um and so reader excavation has
[1:10:33]
been here in town. They've actually
[1:10:34]
already completed um most or or all of
[1:10:38]
the the base bid work. Um we had sent
[1:10:41]
them some additional sidewalk to get
[1:10:44]
started on on 4 East. Um and then
[1:10:48]
there's also the potential uh ELTAC is
[1:10:51]
supposed to be responding to us this
[1:10:54]
week about potential additional funding
[1:10:56]
besides the extra that the city already
[1:10:58]
had. um where you could be able to do
[1:11:01]
even more. So, this is uh for that
[1:11:04]
additional services that that we would
[1:11:06]
be providing.
[1:11:07]
>> As you recall, council, we have a bid,
[1:11:09]
I'm sorry, we have a grant for 250,000.
[1:11:12]
The bid came in, I think, don't hold me
[1:11:14]
to this, about 160. Yep.
[1:11:16]
>> And this is amending the contract to
[1:11:20]
give Reader Construction
[1:11:22]
uh additional latitude to to do this
[1:11:25]
extra work. Correct.
[1:11:26]
>> Yep. Correct. Yeah. that that initial
[1:11:28]
you know 90ish thousand of extra funds
[1:11:31]
plus you know whatever LTAC comes back
[1:11:34]
with whatever extra funds they they have
[1:11:36]
available and for the purpose of the
[1:11:38]
public this money has to be spent by the
[1:11:41]
end of this fiscal year
[1:11:42]
>> uh by the I believe early September is
[1:11:46]
the cut off point yeah
[1:11:47]
>> okay
[1:11:47]
>> so
[1:11:48]
>> thank you Jared any questions comments
[1:11:50]
>> I just wanted to clarify
[1:11:52]
>> so if you remember if you've seen this
[1:11:56]
agreement obviously this
[1:11:57]
published by Coulter. So, you're you're asking us to um to approve this
[1:12:03]
amendment, which is a an additional 135.
[1:12:07]
>> Yep.
[1:12:07]
>> The contract.
[1:12:08]
>> Yeah.
[1:12:08]
>> And then um do you recall off the top of
[1:12:11]
your head how many additional linear
[1:12:14]
feet you were able to uh of sidewalk
[1:12:16]
were you able to provide?
[1:12:18]
>> Um
[1:12:19]
I know on 400 East it was it was quite a
[1:12:22]
bit. Um it was, you know, all of that
[1:12:25]
behind
[1:12:27]
um
[1:12:29]
behind the store there that was redone.
[1:12:32]
Uh there's a couple of blocks of
[1:12:34]
sidewalk and then there's going to be
[1:12:36]
even more besides that. Um I don't
[1:12:40]
remember Scott what you and Jake had
[1:12:42]
talked about.
[1:12:45]
» Like 300.
[1:12:48]
>> Yeah.
[1:12:48]
>> And include 480 ramps. 4880 ramps and
[1:12:53]
then there was more on Second East.
[1:12:58]
That was the next section. That was the
[1:13:00]
priority east.
[1:13:03]
It'll be going from second north all the
[1:13:05]
way
[1:13:16]
heritage home area.
[1:13:18]
>> This is this is this is this is
[1:13:20]
wonderful. Yes,
[1:13:21]
>> we've had we've had uh from memory,
[1:13:24]
we've had multiple people come to these
[1:13:26]
chambers and ask us uh please please fix
[1:13:30]
the sidewalks and uh this is an answer
[1:13:34]
to that uh request and and we appreciate
[1:13:36]
you going the extra mile and applying
[1:13:38]
for additional funds and yep
[1:13:40]
>> doing the work that you've done because
[1:13:41]
uh you've even got your name in the uh
[1:13:44]
on social media
[1:13:46]
couple members of our community that was
[1:13:49]
expressed gratitude for for what is
[1:13:51]
taking place.
[1:13:52]
>> Yeah. Well, thank you. Thank you, Jared.
[1:13:55]
This addendum, Jared, has some specific
[1:13:57]
locations listed. Um, but one
[1:14:01]
intersection I don't see, and maybe it's
[1:14:03]
on here,
[1:14:05]
First East and First North by the
[1:14:07]
hospital. Out of those four, there's
[1:14:09]
only one ADA ramp there. Is that on this
[1:14:12]
list of additional?
[1:14:15]
>> Okay.
[1:14:19]
That's my pet intersection as Scott
[1:14:21]
knows. Yeah. Thank you.
[1:14:23]
>> Thank you, Jared. Okay. I'll entertain a
[1:14:25]
motion to take action on this amendment
[1:14:27]
on the sidewalks. Gentlemen,
[1:14:34]
» I'll make a motion that
[1:14:37]
uh we move forward with the amendment to
[1:14:39]
the owner consultant agreement,
[1:14:40]
amendment one for the child pedestrian
[1:14:42]
safety ADA ramps and sidewalks.
[1:14:45]
>> Is there a second? I'll second that. All
[1:14:47]
in favor?
[1:14:49]
I I
[1:14:50]
>> I I
[1:14:51]
>> motion carries unanimously. Thank you.
[1:14:54]
We're down to bond option for sidewalk
[1:14:56]
and improvement agreement Silver Sage
[1:14:58]
PUD. Sean's already on his way up. Thank
[1:15:00]
you, Sean.
[1:15:02]
>> So, I just spoke with Mr. Rouse. Uh he's
[1:15:04]
decided to withdraw his request, so uh
[1:15:08]
we won't be considering that at this
[1:15:09]
time.
[1:15:12]
» Thank you, Sean. It's an action item.
[1:15:14]
What do we do? just uh say the request
[1:15:17]
has been withdrawn.
[1:15:19]
>> You need a motion on it.
[1:15:22]
>> Thank you very much, Linda. You've got
[1:15:24]
that, I'm sure. Okay. Uh we're down to
[1:15:27]
unless I missed something. Council and department head report on
[1:15:31]
the signed designations. Terry Larson,
[1:15:34]
do you have anything to report?
[1:15:40]
» No, we lost.
[1:15:40]
>> He's gone. Brent Dodge.
[1:15:42]
>> No. Thank you, Mayor. Thank you, Chris
[1:15:44]
Larson.
[1:15:46]
>> Thing I just wanted to mention is that
[1:15:47]
we're coming up on, believe it or not,
[1:15:51]
the holiday season planning and things
[1:15:53]
like that. Um, school's getting ready to
[1:15:56]
start again. But as far as the
[1:15:58]
candlelight dinner is concerned, uh we are um having that again this year.
[1:16:03]
It will be on November the 7th, which is
[1:16:05]
a Saturday. We would invite uh anybody
[1:16:09]
in the community to come out to the
[1:16:11]
candlelight dinner that everybody's
[1:16:14]
invited. We get asked every year, do you
[1:16:16]
have to be part of an organization or
[1:16:18]
whatever? You don't. Individuals are
[1:16:19]
more than welcome to purchase a seat for
[1:16:22]
that catered dinner and uh come out to
[1:16:25]
the Robinson building and enjoy that.
[1:16:27]
There's a
[1:16:29]
uh an a silent auction that goes on. uh
[1:16:32]
any of the funds or anything that's
[1:16:33]
raised always just goes back into uh the
[1:16:36]
traditions that we have downtown on
[1:16:38]
Thanksgiving weekend as well as
[1:16:40]
replacing lights uh downtown during the
[1:16:43]
holiday season. So that's coming up. Put
[1:16:45]
it on your calendar. We'd love to see a
[1:16:47]
big turnout and honestly I'd love to see
[1:16:49]
you purchase tickets early so that we
[1:16:51]
know what to plan on.
[1:16:52]
>> Thank you for that, Mr. Thomas.
[1:16:54]
>> Believe it or not, nothing.
[1:16:57]
>> Okay. And I'd like to have our uh
[1:16:59]
wastewater treatment plant operator
[1:17:02]
director uh um Brian Moss. Thank you,
[1:17:06]
Brian.
[1:17:08]
>> Yes, thank you. Uh progress report for
[1:17:11]
the month of July. We're down to fine
[1:17:14]
details for the most part at the
[1:17:15]
treatment plant. It's largely
[1:17:16]
operational at this point. Um getting a
[1:17:19]
lot of stuff crossed off of the punch
[1:17:21]
list. Uh Keller's been great at showing
[1:17:23]
up and making sure a lot of that stuff
[1:17:25]
is done to completion and correctly. Um,
[1:17:28]
we've added things here and there. Um,
[1:17:30]
RSCI has been great to work with as far
[1:17:32]
as uh, making sure things are wrapped up
[1:17:34]
for the most part. Um, getting a lot of
[1:17:36]
cooperation with them. Uh, Violia, we're
[1:17:40]
still working with trying to get the
[1:17:42]
membranes dialed in completely. They are
[1:17:44]
operational and they are working and we
[1:17:46]
have gotten a lot of the things that uh,
[1:17:48]
we need to to get those working. Uh, but
[1:17:50]
we're still, you know, getting some of
[1:17:52]
those bugs worked out. Uh but as a whole
[1:17:55]
as it is, the treatment plant has
[1:17:57]
consistently been meeting our permit
[1:17:59]
limits to levels that the city has not
[1:18:01]
seen before. Uh the quality of the water
[1:18:03]
going back into the creek is better than
[1:18:05]
it's ever been uh for the month of July.
[1:18:08]
We have successfully treated and
[1:18:10]
discharged over 16 million gallons back
[1:18:13]
into the Worm Creek. Um through that
[1:18:16]
process, we also uh uh accumulate
[1:18:19]
bioolids in the process. That's not the
[1:18:21]
same as trash that we're able to pull
[1:18:22]
out in the beginning stages of the
[1:18:23]
treatment plant. Um, that's the bacteria
[1:18:26]
and other bugs that are working to treat
[1:18:28]
the organics and other things of the
[1:18:29]
wastewater. Uh, but that has to get
[1:18:31]
wasted out regularly to maintain a
[1:18:33]
healthy plant. Uh, we have removed 25
[1:18:36]
tons of that from the plant over the
[1:18:37]
month of July. Um, and these are ongoing
[1:18:41]
processes that happen, you know, every
[1:18:44]
day. So, uh, we're working with the
[1:18:46]
county and the landfill and how they
[1:18:47]
accept that and and they've been great
[1:18:49]
to work with as well to help us, uh,
[1:18:51]
have a place for us to put that stuff.
[1:18:53]
Um, Headworks, uh, we've seen some, uh,
[1:18:57]
work there with the HVAC system, uh,
[1:18:59]
and, uh, Huber has been out to check on
[1:19:02]
some of the equipment. We're still
[1:19:04]
looking at some replacement of some
[1:19:05]
equipment there that hasn't been working
[1:19:06]
correctly. Uh, it is under warranty and
[1:19:08]
Huber is going to be replacing that
[1:19:10]
stuff. Um, we're just waiting on that
[1:19:12]
because that's coming from Europe. So,
[1:19:14]
it takes time to get here right now. Uh,
[1:19:17]
as far as everything else, like I said,
[1:19:19]
we're just down to fine details for the
[1:19:20]
most part.
[1:19:23]
Brian, if I can ask, put you on the spot
[1:19:25]
a little bit. You stated that our water
[1:19:28]
uh quality from the treatment plant is
[1:19:32]
better than ever. Can you
[1:19:35]
give us a specific from what to what?
[1:19:39]
Are we getting close to DEEQ
[1:19:41]
requirement?
[1:19:41]
>> Right. So, a lot of the things that we
[1:19:43]
have to remove uh the suspended solids
[1:19:45]
in the wastewater, the uh a lot of the
[1:19:49]
uh components that create a demand on
[1:19:52]
the oxygen from the wastewater, you
[1:19:54]
know, so we don't want to cause fish
[1:19:55]
kills and things like that by putting
[1:19:57]
oxygen depleted water back out to the
[1:19:59]
creek, things like that.
[1:20:01]
um the percent removal that we have to
[1:20:02]
get from a lot of the uh minerals and
[1:20:05]
other uh things that are carried in
[1:20:07]
wastewater. Uh prior to uh this
[1:20:10]
treatment plant that we currently are
[1:20:12]
operating, we were consistently in the
[1:20:15]
best day low 90s mainly in the mid 80%
[1:20:19]
range of removal. We are consistently
[1:20:22]
hitting 98 99% removal of all these
[1:20:25]
things right now. So it's very very
[1:20:28]
clean going back into the creek. That's
[1:20:30]
got to be impressive to the regulators.
[1:20:32]
>> It helps keep them off our back. Yes.
[1:20:34]
>> So, let me ask you this. Is it clean
[1:20:36]
enough that you'd drink it?
[1:20:38]
>> I wouldn't go that far. I was I think
[1:20:40]
Terry asked me that before, too. And and
[1:20:41]
I I would probably send it through
[1:20:43]
another filter before that. But, but we
[1:20:45]
are seeing because of treatments and
[1:20:47]
technologies like we have right now
[1:20:49]
where ideas of putting a water treatment
[1:20:52]
plant on the end of a wastewater
[1:20:53]
treatment plant is not very far off
[1:20:55]
anymore.
[1:20:56]
So, uh, and also to mention, uh, the
[1:20:58]
city Preston will be hosting, uh, there
[1:21:01]
are organizations out there that help
[1:21:03]
operators maintain their licenses. And,
[1:21:05]
uh, Southeast Idaho operator section is
[1:21:08]
one of those. And that concludes
[1:21:10]
operators from both water and wastewater
[1:21:12]
in Southeast Idaho. And they will be
[1:21:15]
coming here for a class this week. And
[1:21:16]
we will also be including a tour of the
[1:21:18]
plant for them while they're here.
[1:21:22]
>> Good report. Thank you.
[1:21:23]
>> May I have Go ahead, please.
[1:21:25]
>> Yeah. So there's two stages as I
[1:21:27]
understand it. Actually there's a lot
[1:21:29]
more stages but the uh the sand
[1:21:31]
filtration system and then the membrane
[1:21:33]
system. Um
[1:21:36]
I guess there was a there was some
[1:21:38]
confusion or maybe a lack of fitting
[1:21:41]
problem with the membranes and and
[1:21:43]
that's the part that you spoke about
[1:21:45]
that they're fixing that right?
[1:21:48]
>> Something of that. Yes.
[1:21:50]
>> Yeah. I was just curious on how was it
[1:21:53]
really necessary that we go to the
[1:21:55]
membrane or are you able to get the
[1:21:58]
quality of uh get us up to the uh level
[1:22:02]
or a standard with just the sand uh
[1:22:05]
filtration system?
[1:22:06]
>> Uh there's probably a dozen or more
[1:22:08]
different processes that could have been
[1:22:10]
used. Uh this one was probably most
[1:22:12]
likely selected because of the level of
[1:22:13]
our flows and the footprint. Uh we don't
[1:22:16]
have a lot of area out there. The sand
[1:22:18]
filters would have required a much
[1:22:19]
bigger footprint to be able to handle
[1:22:21]
the same amount of flows. So, you know,
[1:22:24]
that that would have definitely been
[1:22:25]
impacted with the decisions there.
[1:22:29]
>> So, we don't have both. We just have the
[1:22:31]
>> No, we just have the membrane.
[1:22:32]
>> Oh, okay. Very good. Thank you.
[1:22:36]
>> Any other questions? Hey, thanks, Brian.
[1:22:41]
Chief McMan.
[1:22:51]
The police department responded 204
[1:22:53]
calls for service during the month of
[1:22:55]
July and 43 of those were just on the
[1:22:57]
rodeo weekend. Officers issued 64
[1:23:00]
infractions with 26 were on the rodeo
[1:23:02]
weekend. 11 misdemeanor, two were on the
[1:23:04]
rodeo weekend. 19 city citations, which
[1:23:07]
17 were on rodeo weekend. filed four
[1:23:10]
felonies and conducted 229 traffic stops
[1:23:12]
which 63 of those were on rodeo weekend.
[1:23:16]
Copy the calls been attached as well as
[1:23:17]
the month of reported dispositions.
[1:23:19]
During the month of July, we had a lot
[1:23:21]
of department training. We had a use of
[1:23:23]
legal use of force legal update from IIC
[1:23:26]
crimp. We completed a CPR research
[1:23:28]
training and we appreciate Katie Golitly
[1:23:31]
for doing that for us. I had Matt
[1:23:33]
Dassler conduct some Archon training for
[1:23:35]
us and ITD came down and helped officers
[1:23:39]
uh Gaye and Griffin get trained up on
[1:23:40]
the use of the new school lights out on
[1:23:42]
91 by the junior high. Uh those new
[1:23:45]
lights are way easier to program and
[1:23:47]
hopefully they'll be more easily seen by
[1:23:50]
traffic. We survived the rodeo weekend
[1:23:52]
which was extremely busy for us and it
[1:23:54]
sounds like it's going to get even worse
[1:23:55]
for us with them adding another day to
[1:23:57]
it. Uh making it almost an entire week
[1:24:00]
for us instead of just a weekend. There
[1:24:02]
were some issues that came up with the
[1:24:03]
parade and I'll be discussing those with
[1:24:05]
the head of the parade committee uh
[1:24:07]
hopefully pretty soon so they can get uh
[1:24:09]
working on it by the end of the by the
[1:24:12]
time they get started for the next one.
[1:24:15]
The officers that were on foot patrol
[1:24:16]
during the parade had some very positive
[1:24:18]
interactions with the community. It has
[1:24:20]
also been very helpful to have an
[1:24:21]
officer assigned to take calls on each
[1:24:23]
side of the city. Seems how we can't get
[1:24:25]
across uh each side very quickly.
[1:24:29]
We did have several accidents over rodeo
[1:24:31]
weekend, which is expected when we have
[1:24:32]
so many visitors and such an enormous
[1:24:34]
increase in traffic. I would like to
[1:24:37]
give a huge thank you to Bill Chambers
[1:24:39]
with Northstar's Ultimate Outdoors for
[1:24:41]
providing us a side by side to use over
[1:24:43]
the weekend. We did have an ambulance
[1:24:45]
call during the parade one of the nights
[1:24:47]
and it helped to have the side by side
[1:24:49]
to assist getting the ambulance to the
[1:24:51]
hospital. Now, we move on to the
[1:24:53]
Franklin County Fair and school starts
[1:24:55]
on August 24th. Um, one thing I'd like
[1:24:58]
to mention is you're talking about
[1:24:59]
sidewalks. That's one thing I noticed
[1:25:02]
over the the rodeo weekend. We really
[1:25:04]
need to look at getting sidewalks on 300
[1:25:07]
North and around our uh parks and
[1:25:11]
fairgrounds. There's a lot of foot track
[1:25:14]
over foot foot traffic over there year
[1:25:16]
round on a lot of things. 300 North has
[1:25:19]
zero sidewalk on it heading towards the
[1:25:22]
fairgrounds and so there people are
[1:25:24]
having to walk in the lane of traffic.
[1:25:25]
So, I would just as as in the in the
[1:25:28]
coming years as we start looking at at
[1:25:30]
sidewalk, that was that would be one
[1:25:31]
that I would suggest putting on top of
[1:25:33]
the list.
[1:25:36]
>> A good suggestion. I'm surprised that
[1:25:38]
hasn't been suggested before to be
[1:25:40]
honest with you. Thank you. Any other
[1:25:42]
questions for the chief?
[1:25:44]
Thank you,
[1:25:46]
Mr. Montgomery. You're chomping at the
[1:25:48]
bit here.
[1:25:54]
All right, the last little bit we've had
[1:25:56]
a a water leak on Second West, 186 South
[1:26:00]
where we had to pull a new service line
[1:26:02]
for that house. Um, we've painted
[1:26:05]
crosswalks and we do have a few more to
[1:26:07]
go. Um,
[1:26:11]
we cut down the tree that was behind
[1:26:14]
Carquest in that little alleyway. It had
[1:26:16]
a big crack in it, so we got it down
[1:26:18]
before it came down on someone's
[1:26:20]
vehicle.
[1:26:21]
Uh we've had the tree stumps ground
[1:26:24]
down. We've put sod back in into place
[1:26:26]
or hardly even know that they're gone.
[1:26:29]
Uh we had a water leaky on 2200 South
[1:26:33]
1164 East.
[1:26:35]
Um
[1:26:37]
we put up and taken down the rodeo flags
[1:26:39]
on Main Street.
[1:26:42]
We've had two water meters that we had
[1:26:45]
issues with that wasn't reading right
[1:26:47]
when we got there to change them out.
[1:26:50]
realized that they were way too deep and
[1:26:52]
we were not able to work on them at that
[1:26:53]
time. So, we had to raise them up. Our
[1:26:57]
Vermeier vac
[1:26:59]
has had to go to Idaho Falls to get some
[1:27:02]
work done on it. It
[1:27:05]
quit working on us. Um, having some
[1:27:08]
issues with it. We trim the trees behind
[1:27:11]
the the furniture store so it's not
[1:27:14]
rubbing their trailer or their truck as
[1:27:16]
they go in and out of the alleyway.
[1:27:19]
uh the sidewalks, the ADA ramps, they
[1:27:22]
pretty well completed everything over
[1:27:23]
here in this section of town that they
[1:27:26]
was originally contracted to do. They
[1:27:29]
are now over on fourth east. They're
[1:27:31]
going to start that tomorrow.
[1:27:34]
Uh Scott Weekes has been out on the road
[1:27:38]
grader on our couple gravel roads that
[1:27:41]
we've had. He's been smoothing those up.
[1:27:42]
Gordon's been out in the patch truck and
[1:27:46]
the dump truck that we have ordered a
[1:27:47]
couple years ago. I finally got the text
[1:27:50]
saying that it is done. It's just got to
[1:27:52]
get delivered.
[1:27:54]
So,
[1:27:57]
» do does our sidewalk contractors readers
[1:28:00]
are they aware that schools start on
[1:28:02]
August 24th and will they get that done
[1:28:04]
in the next two weeks?
[1:28:06]
>> That's why he says that they will be
[1:28:08]
done.
[1:28:09]
>> Thank you.
[1:28:09]
>> So,
[1:28:10]
>> any questions for Mr. Montgomery.
[1:28:13]
Thanks, Scott. Sean
[1:28:20]
uh coordinated a meeting with Jones and
[1:28:23]
DeL as well as public works and facer
[1:28:26]
excavation on the eighth north waterline
[1:28:28]
project. We'll have another meeting on
[1:28:30]
the 12th. Um and then they should be
[1:28:32]
starting that on the 17th. Um so far so
[1:28:37]
good. I think uh everything went pretty
[1:28:39]
smooth at that initial meeting. Uh we'll
[1:28:41]
kind of see how that goes uh once
[1:28:43]
construction actually starts. But uh I
[1:28:45]
think we've made a good choice there. Um
[1:28:48]
we'll get uh once the budget passes,
[1:28:50]
I'll start looking for uh
[1:28:53]
grants for the impact study and capital
[1:28:55]
improvements plan. Um been refining a
[1:28:59]
few things in cloud permit uh tweaking
[1:29:00]
the different uh certificates and
[1:29:04]
permits. Um so uh that's going well.
[1:29:08]
still running in the system, but it's uh seems to be working pretty well
[1:29:10]
for us. Um we made the purchase for the
[1:29:15]
downtown Rotary Park of the uh the
[1:29:18]
banner signs, the metal banner signs.
[1:29:20]
So, those are going to be uh that bill
[1:29:23]
was signed this just just now. And that
[1:29:26]
uh those will be fabricated and then
[1:29:28]
delivered. Um and then we'll be
[1:29:31]
responsible though to get them
[1:29:32]
installed. So, uh I think we still have
[1:29:35]
a little bit of money left over um on
[1:29:37]
those ARPA funds that were obligated to
[1:29:39]
that. Um so, we'll have to look and see
[1:29:41]
what we can get done with that, but u
[1:29:43]
you know, maybe a little bit of concrete
[1:29:44]
and a few things like that.
[1:29:46]
Um our domain name lapsed uh for a few
[1:29:49]
hours. So, um
[1:29:53]
we uh purchased uh re repurchased it for
[1:29:56]
nine years. So, that won't happen again
[1:29:58]
for a long time. Probably by the time
[1:29:59]
that happens again, we'll have forgotten
[1:30:00]
about it and have to figure it out.
[1:30:02]
um working with Lyall on a few things as
[1:30:05]
far as water code and how wells can be
[1:30:09]
uh integrated into the city or not. Um
[1:30:12]
so we've been discussing a few things
[1:30:14]
and uh once we get everything ironed
[1:30:16]
out, I'll bring that back to you on uh
[1:30:18]
what we've what we determine.
[1:30:21]
Um
[1:30:23]
Kellen Associates um had a few things on
[1:30:26]
Silver Sage PUD phase one. So, they're
[1:30:28]
going to make a few changes to their uh
[1:30:30]
construction documents. And then, uh
[1:30:33]
their final PL should be forthcoming
[1:30:35]
shortly after that. And then, um
[1:30:40]
also with that, there may be a request
[1:30:42]
of a zone change on the south end of
[1:30:45]
that property. Um there was a kind of a
[1:30:49]
single lot that they were planning
[1:30:51]
initially on doing just some additional
[1:30:54]
multifamily housing. Uh however uh with
[1:30:57]
interest in the commercial side um the
[1:31:00]
people who are interested in that want
[1:31:02]
it to be want that lot to be changed to
[1:31:03]
commercial so they can purchase it for
[1:31:04]
their use. So uh that may be forthcoming
[1:31:07]
here soon as well. Um
[1:31:12]
we had the forecast board meeting on the
[1:31:14]
6th. Uh I was elected chair of the board
[1:31:16]
again this year.
[1:31:19]
Uh updated the website with information
[1:31:21]
for Rex soccer. And then uh included in
[1:31:24]
your packet, there was a world atlas uh
[1:31:27]
article where Preston was named uh one
[1:31:30]
of the nine towns in Idaho for a weekend
[1:31:33]
retreat. So that's kind of a cool thing
[1:31:35]
uh that they did. Uh so I just encourage
[1:31:38]
you to read that and if anybody um
[1:31:40]
anybody out in the community would like
[1:31:41]
a copy of that as well, I've got a copy
[1:31:42]
that they can read. So any questions
[1:31:45]
about anything?
[1:31:46]
>> Thank you.
[1:31:47]
>> Thanks, Sean. Good report. This
[1:31:49]
concludes our council meeting. Our
[1:31:51]
commissioner informed me that he had to
[1:31:52]
get over to the fair before 6:30. He had
[1:31:56]
nothing to report. So, we will now
[1:31:58]
adjourn this meeting and we will
[1:31:59]
reconvene on August 24th, which will be
[1:32:02]
our public hearing for our budget. Thank
[1:32:04]
you everyone.