[0:14] over
[0:17] here okay so I think we can get started with the training if that's okay it's 7
[0:23] so what we're going to do is um there's a lot of resources on The Duchess County
[0:28] Planning Federation and there's a few good ones that we thought we might be
[0:31] able to utilize they're longer they're like an hour an hour and a half so we'll
[0:35] just do segments of it like do first segment now and then the first the rest
[0:39] of it um at the next meeting but this one is on Housing Development Finance
[0:43] 101 it was done by Doug alott um who works for CPC so he's financing a lot of
[0:49] the projects kind of in the Hudson Valley why we thought this was important
[0:53] for the board is I think when we're talking about design choices and we're
[0:56] talking about um aspects that could be added to planning board projects I think
[1:01] something we often heard is that's not financially feasible or you know I think
[1:05] we hear that a lot especially now in the current Construction in the financing
[1:10] Climate about how expensive these projects are and why are certain things
[1:15] can be added or cannot so I think in order to have more fruitful
[1:18] conversations with with applicants when we're talking about that that we thought
[1:22] this Finance course might be helpful I haven't seen this one yet but I heard
[1:26] good things about this and Doug alott actually did a he did came and did a
[1:31] training for the um for the city council of last year kind of on the same topic
[1:36] so that's we'll just do we'll run this until 7:30 is when the trainings go
[1:42] right and then and then we'll get into the
[1:45] meeting and I'm pleased to welcome our speaker Doug Al with CPC the community
[1:50] preservation Corporation Doug has worked in a variety of roles with CBC for over
[1:55] 25 years and he's currently the senior vice president and director of Lending
[2:00] the valley office he oversees the lending process from origination through
[2:04] writing construction supervision and conversion to permanent finan and i'
[2:09] just like to add that one of the reasons we wanted to host this class is that at
[2:12] County Planning we understand that when you're on a local planning board and
[2:17] post project you're not on board you he about something in your community it can
[2:22] difficult to
[2:28] understand so while every project is different there's a balancing act
[2:32] between what penciled out with the bank and what doesn't and so I expect next
[2:36] presentation will provide us all more concrete understanding of the
[2:40] complexities of Housing Development and financing so with that I
[2:46] will over to thank you um good evening everybody
[2:53] um pleasure to be here um one thing that have didn't mention is aside from my
[2:58] role here at CBC um I've also been member of the quot sing board of appeals
[3:06] where I live in build H down in Westchester County for 16 years so I'm
[3:11] familiar with these continued education courses and participated in that level
[3:18] so I guess where said I'm one of you um I wanted to give you first a little
[3:24] background about CPC um we were established in 197 four
[3:30] we are a not for-profit uh lending institution which is kind of a weird um
[3:37] model but we we uh we have a we have a Consortium of about 15 banks that offer
[3:42] us lines of credit to do construction BS well it's one line of credit we loar it
[3:48] out on their line and uh and then we also have a number of um uh permanent
[3:55] loan products for when the project gets uh completed and leased and is is you
[4:00] know mostly what we do is rental housing we do do some home ownership housing but
[4:05] we also do the 30-year um permanent mortgage on on Project after it's
[4:11] completed and um you know we believe that you know housing is really Central
[4:17] to transforming neighborhoods into thriving communities um we try to
[4:24] collaborate with municipalities with not for-profits with private Developers
[4:30] Church organizations all with the goal of of you know trying to make our
[4:35] community better provide both uh both market rate and affordable housing um
[4:43] because we realize that there's different segments
[4:46] within um in terms of affordability um and our our goal is is
[4:53] really broader Community revitalization um goals for for the community to work
[4:59] so that's a little background us um and you know we since 1974 we've invested
[5:06] over 14 billion dollar almost all that been in New York state we have Regional
[5:11] Offices throughout the state as hether mentioned I'm the director H office for
[5:16] 28 years um and then there's sort of the
[5:20] other benefits that go into the Investments we've done finan that over
[5:25] $225,000 225,000 residential units which provided housing for more than a
[5:32] million people and you know also creates jobs um we estimated 120,000 jobs
[5:39] created through our programs so that's sort of like the social benefit um um
[5:45] and then our you know we're Mission PR so we don't we're not really a bank we
[5:49] don't we don't do um you know we don't do luxury
[5:54] housing do hotels we focus on housing we also do mixed use properties um which
[6:02] involve typically ground Flo retail commercial businesses um but mostly our
[6:07] focuses on housing and we're trying to figure out ways to produce to lower the
[6:11] costs of producing affordable housing um and help close the racial wealth Gap and
[6:18] also commit to investing in the green economy a lot of what we do is we have a
[6:22] whole sustainability uh Department try to promote uh Green Building energy
[6:28] efficient buildings um um and so that's also one of our kind of
[6:33] mission goals so that's that's about us and then before I get into to the
[6:38] program um I kind of wanted to just give you like what I want the takeaways to be
[6:44] here and and some of the things I'm some of the slides are shown involve math I
[6:50] don't need to get like don't get too tied up in the
[6:54] math just uh to show how a lender looks at a
[7:02] project and a developer and the due diligence that we we uh that we do
[7:08] before we agree to finance a project how we monitor throughout construction how
[7:13] we also monitor once it goes into a 30-year permit mortgage we also service
[7:20] all of the the permanent loans that we do um the typically 30e mortgages on on
[7:26] multif family rental properties that that Finance so we also monitor post
[7:31] post construction and res as well and I think that you
[7:36] know sometimes people think developers are just running REM in the streets and
[7:42] doing whatever they want but there's a lot of oversight that goes into a
[7:46] landing on an affordable or any kind of multi family project it's a very risky
[7:52] um there's a lot of risks involved with it and we can take it very seriously so
[7:59] you know we're typically investing usually somewhere around 75 or 80% of
[8:05] the total project cost so we're the biggest invested in these in these
[8:09] projects and we take it very seriously and we want to make sure that it's
[8:14] successful for the developer communi from
[8:19] T so those are those are the takeways that I want to try
[8:26] to imprint in your mind for going the presentation so the first thing I wanted
[8:32] to talk about is what we call the five Seas of credit and these are the things
[8:38] that we look at when we're looking at a developer or a a particular project and
[8:44] the most important see is character and so we're reviewing the credit history
[8:49] and experience of the borrower we check their business references we check the
[8:53] credit references um we Google them we want to
[8:57] make sure that they're reputable people and that they're um going to
[9:02] provide that they're going to perform on Project when when when we Finance you
[9:08] look at their capacity that's their ability to pay the loan previous
[9:13] projects completed we want them to done projects of similar size similar scope
[9:19] we look at their personal and business financial statements for both the
[9:22] developer and the general contractor for construction
[9:26] projects uh we review the sources of capital that's the third c um and that
[9:33] there's basically three types of of capital sources one is equity or the
[9:38] cash contribution of developer uh and when I say CDC I'm also mean any any
[9:44] kind of conventional Bank Lo we're a little bit different than a bank as I
[9:48] explained but um you know this is most langues would look at things the same
[9:52] way as us and then if there's a gap um which there often is in affordable
[9:58] housing projects uh because the rents are typically lower
[10:02] uh than in a market rate uh project then we we look to to use public subsidy
[10:08] sources to fill that Gap so there's three capital sources cash conventional
[10:13] loan and public subsidy and the fourth St the collateral which is the property
[10:19] itself or and if it's new construction we're looking at the projected completed
[10:23] product or what is planned to be constructed it's a renovation project
[10:28] same thing what what's the project going to look like after it's renovated we do
[10:32] a lot of adaptive reuse projects where we're converting old mil buildings into
[10:37] housing or um you know things like that we call that um you know call that
[10:44] adaptive use and then the other collat that we take on properties not just the
[10:50] property itself but we also we want to ensure completion of project so often
[10:54] we'll take either a bond or a letter of credit as additional collateral 10% of
[11:00] the construction cost so if there's a cost overrun then we can pull on a
[11:04] letter of credit of the bond to make sure the project gets successfully
[11:07] completed and then the last see is just what we call conditions and that's like
[11:12] the condition of the neighborhood what's going on in the market with construction
[11:16] costs what's going on with the local economy what's going on with the
[11:20] national economy what's going on with interest rates what's going on with
[11:23] Market R so sort of like the conditions of the economy and so those are the five
[11:29] of credit um and that you know that's that's that's what is the basis of our
[11:36] our
[11:39] evaluation and the next thing I wanted to talk about was the project
[11:45] feasibility and there's three things that we look at in the predevelopment
[11:49] stage before a project gets financed and that is the site itself or the project
[11:56] itself the development team and the financials and that's uh and I'm
[12:02] going to talk mostly about the financials of rental properties that's
[12:06] primarily what we Finance so so you know the site itself we go out we inspect the
[12:12] property we we we look at the site we review it for does it have own
[12:18] compliance does it have access to Transportation are there comparable
[12:23] projects in the area what are other Municipal considerations permits
[12:27] building codes that need to be and um and are there any Community plans out
[12:31] there preferences what does the community itself Want U and we try to
[12:37] work with municipalities that want to promote different types of projects so
[12:44] we we look at that whole package when we're looking at a site the project and
[12:48] then in terms of the development teams it's who's going to who's going to be
[12:52] responsible for making sure this this is successful development and we look at
[12:57] the owner and developer and often times there's non for-profit sponsors that go
[13:02] to join Ventures with with different types of developers we we look at the
[13:08] experience of the architect and the engineer that's working on the project
[13:12] we want to know about the general contractor who's building it um his
[13:17] what's his capability and then on the back end we want to we review the
[13:22] management company make sure they're management compan is subject to our
[13:26] approval um prior closing on you know 30-year permanent W and then there's
[13:33] other Consultants involved um there's a lot of programs out there both through
[13:37] the utility companies and through different state programs to promote
[13:40] Energy Efficiency so there's Al there's also Consultants involved that may be
[13:45] involved with that aspect and then um the last thing this
[13:50] is something I'm going to kind of focus on in the next few slides is is the
[13:54] financials of rental properties and how do we determine how much SP you loan on
[13:58] the property and unlike I mean most of you probably have your home home buyer
[14:03] mortgages you know when when they qualify for home buyer mortgag they're
[14:07] really looking at your personal income which is different than multif
[14:11] family lending multif family lending loan on the cash flow for building where
[14:16] the projected cash flow to building so when we size the loan we look at the
[14:22] income from the apartments retail if there is a mix juuse and other uh types
[14:29] of income that a property can produce such as if there's a laundry room if
[14:33] there's parking fees there maybe sell Tower rentals on them so we look at all
[14:37] the income that the property produces first and then we look at the property
[14:43] operating and maintenance expenses and those are we call onm and that's
[14:48] basically all the property expenses exclusive of the Deb service or mortgage
[14:53] PS on the along and so you know you can see the list of um operating expenses
[15:00] you know real estate taxes Insurance utilities and repairs management
[15:05] expenses administrative leg you got salar got landscaping
[15:11] sowl and then this this is something that most building most multi family
[15:16] lenders require is a building Reserve um which is which is basically a force
[15:21] savings account building typically take a reserve of $250 per apartment per year
[15:28] which is month L um along with your principal interest payments that goes
[15:32] into a savings account we building so the 10 years from now we building new
[15:37] roof we have a we have a little Nest day to make sure that it main get gets
[15:42] maintained in the long term so that so that's income and expenses so we we
[15:48] subtract the income from the expenses and then we get What's called the net
[15:53] operating income for some called
[15:59] and and that the noi is is what's left over to pay the
[16:06] debt service payments or the mortgage payments and the remainder is becomes
[16:10] profit for the developer or cash flow or it could become or it's a pushing in the
[16:18] event that something happens so operating expenses go up
[16:22] rents drop uh you know things happen it's it's cushion for the the uh for the
[16:30] lender as well as potential profit for theel if things go so typically we take
[16:36] the gross potential income so we take all we all the r that they collect
[16:40] monthly we subtract a vacancy loss of somewhere between 5 and
[16:44] 10% um and that's just because you know Apartments turn over scores close
[16:51] sometimes ten don't pay rent you know so it's it's a subtraction you typically
[16:56] don't get 100% of your r inome uh per year because of vacancy or called non
[17:05] payment rent so I'm going to use a real life example this is a a real project
[17:11] that we did in East stand the Reber um these young guys um who actually came up
[17:17] from Brooklyn and decided to make their home in in Newberg and they started
[17:23] buying small properties in East End and renovating them um into housing and I I
[17:29] changed the Dr here to protect the innocent but suffice to say this is a
[17:34] real project that need and and and it's a vacant building um and it's able to be
[17:41] renovated into five apartments and one storefront and then I'm showing the
[17:46] income here the rents were just shy of $1,200 a month for the apartment that
[17:50] was the average rent there was a store that was paying 1,000 bucks a
[17:54] month for the for their lease and and so that gave us a gross income here of
[18:03] 71,000 on the residential rents and 12,000
[18:08] retails then we had to subtract the vacancy from that um so we had about
[18:14] $5,000 LS for the for the residential and about ,200 for the for the for the
[18:23] space so the net income um goes down
[18:29] to 77,000 so that's what we're projecting is going to collect hopefully
[18:35] but what happens if 110 here one of these five stops paying rent for 6
[18:41] months and you have to evct and that takes another few months all of a sudden
[18:45] you don't have 7% vacancy allow you probably have more like 20% so there's a
[18:51] risk of that but generally um properties operate in in these kind of agency
[18:57] levels so then so we know what our net
[19:01] effective income is this is what we're collecting
[19:05] 77,000 what are the expenses okay so we got all our taxes insurance and
[19:10] everything else so we got $38,000 in operating expenses and we're we have a
[19:16] net effective income after vacancy of 77,000 total operating expenses of
[19:22] 38,000 and that gives us a net operating income to pay debt service and profit
[19:28] of9 ,000 so how do we size the loan based on
[19:33] that so that's $39,000 operated income we calculated
[19:39] that we could loan $440,000 and this for Opera over 30
[19:43] years at 54% and so the debt Ser principal and
[19:48] interest payments on that were $29,000 so this roughly $10,000 is his
[19:55] cash flow and profit for the year hopefully all go as well so the the
[20:00] margins can be pretty thin on these properties particularly Smalls and a lot
[20:05] of the Hudson Valley Properties are in small buildings I don't need to tell you
[20:09] guys that been the D Pan um there's a lot of properties that are let say less
[20:15] than 20 Apartments that's makes up the majority of the housing stock in M of
[20:19] Val so we we look at something so how do we arrive at this
[20:24] $440,000 we have something which is called debt service coverage and the de
[20:28] service coverage is the ratio of the net operating income over the annual dead
[20:33] service so in this case it's 1.34% and somebody told me a long time
[20:37] ago which makes sense that means for every dollar of debt that the owner has
[20:42] to pay he has a dollar 20 to a dollar most lenders
[20:47] require a ratio of between 1.2 and 1.3 that means I have an extra 20 or 30
[20:53] cents per dollar of debt in my pocket and this is this 20 or 30 in this case
[20:59] 34 cents is is basically going to be over to profit and that's how we that's
[21:05] how we determine mon so remember that 440 it's a key
[21:12] number the other thing we look at is loan to value okay lenders do not like
[21:18] to loan 100% of the value of a property why something goes wrong you have to
[21:23] sell it in a foreclosure you have to foreclose L typically people in closure
[21:28] sale don't pay the full value of property they try to get it for Less so
[21:33] generally lenders want to keep their maximum loan to value LTV of between 70
[21:39] 80% so in going back to our example of 123 Main Street you take the net
[21:46] operating income how you determine value and you divide it by what's called a cap
[21:49] rate don't worry about what a cap rate is that's that could be a whole another
[21:53] class but it's basically an expected return that real estate Developers
[21:58] expect um in a particular Market in in the Hudson Valley Cap rates generally
[22:03] range between 6 and 8% so in this case we use 7 the appra
[22:08] used 7% cap rate we got a value of $557,000 that means our Lo to Value was
[22:17] 79,000 so we're within our range of 79% so we have our Deb service coverage
[22:24] of 1.3 or better and we have our loan value which doesn't exceed 80% it's a
[22:31] little bit less than 80% that's how we determine this 440 remember
[22:35] [Music] 440 okay
[22:39] so how does debt service coverage and M value affect project feasibility other
[22:45] said that's one of the things we talk about today and the effective
[22:49] feasibility because they limit the amount that a developer can borrow for a
[22:54] particular project if a developer can't borrow enough money Pro may not be
[22:59] financially feed and remember our sources of capital we have Equity we
[23:03] have debt and we have subsidy we already went over that so I won't go into that
[23:08] and then you have development costs U for a project you have what's it called
[23:13] acquisition construction which is which is also known as the hard cost and then
[23:17] you have what we call soft costs these are all your professional Feats you got
[23:21] to pay your architecture engineer the appraiser the title company the survey I
[23:25] didn't put lawyer that's a big number um and then you have your carrying cost
[23:30] like what does it I still have to pay before this thing gets built I still
[23:34] have to pay real estate taxes on the land I got to have insurance to cover
[23:38] the property and liability I have to pay utilities because I'm using power tools
[23:43] at the site and I have construction interest um when we do a construction
[23:48] loan it's kind of like a credit card for a developer he he draws down on the
[23:53] construction as as the project progresses and he Advance it for is in
[23:59] place so uh he has that to carry construction
[24:04] he's not getting rent yet it's not built so that's out of pocket you got to pay
[24:09] for that so those are the the development costs and so here's the real
[24:13] life example these are real numbers the guys the Brooklyn hipsters that came up
[24:19] and decided to live theend ruber it paid $105,000 for the building the
[24:26] construction cost of 300,000 professional fees car cost to the total
[24:31] cost of this development is a little more than a half a million we were able
[24:35] to $440,000 and so he had to put in
[24:39] $5,000 and that makes sense that's that's sort of like the sweet spot for
[24:44] debt in equity somewhere around 20% Equity developers generally don't want
[24:50] to put in more than 30% equity and here CBC
[25:00] sorry pause there at 7:30 so we'll pick up with the debt service coverage next
[25:09] um but yeah I don't know if any if we wanted to chat about that or we want to
[25:12] move straight to the anybody any questions
[25:16] comments let's get party started welcome everybody um October 8th
[25:24] 2024 planning War it's a pleasure to have everybody here
[25:28] um thank you guys all for attending John couldn't make it so I'm in the hot seat
[25:33] tonight I think we got some business to do first um we have a couple of minutes
[25:38] we need to approve it looks like we need to approve we we can't do August because
[25:42] we don't have for we don't have a form that mean in September we can do okay so
[25:49] we do that so she had made one at it I had a couple things I wanted to go over
[25:57] cuz they're actually pertinent to the one of the applications on September or
[26:00] on September okay okay so we're going to par August for the moment I think we
[26:05] have to we don't have and I'm just saying it for we're going to park August
[26:09] for the moment and we're going to go to September you have some comments on
[26:13] September yeah here's what it was on our 19 Henry Street application um first of
[26:19] all one of the commenters Carl schaer he is at 86
[26:25] Katherine Street not 36 significant because it has to do with proximity to
[26:29] the property um should we be actually noting what
[26:35] these people said at least briefly in the minutes because the other commenter
[26:41] was talking about tree cover and then there was a later discussion with the
[26:45] applicant and now there's been changes on the plans about tree cover and it's
[26:50] in um Eric's comments among other things John's comments pardon me yeah the
[26:56] minutes so I'll just say legally the minutes only have to include votes taken
[27:01] and and the board members that were present so that's the only that's the
[27:05] bare minimum legal requirement for minutes um so the the minutes that have
[27:11] been prepared also reference where you can access the video so in addition to
[27:16] the summary you have here you also have the video um that can be accessed by
[27:21] people but beyond that it's between you and and Mercedes as far as like how
[27:27] detailed you want to get in the description of of what was
[27:30] discussed I don't want to make it more difficult than it has to be we should
[27:34] correct the address but okay no I'm just going to in the event of some a
[27:37] situation like what's mentioned and there is some um some clarity that needs
[27:43] respect to the minute should we be more detailed as a question or is it is it it
[27:48] just point towards the video how do we address something like what's being said
[27:53] so there's a couple different considerations one um for your use of
[27:57] minutes you know if you want to refer back to minutes as a summary of what was
[28:01] discussed instead of going back to the video I guess it would be more helpful
[28:05] to have a description um for like litigation purposes if any decision of
[28:12] the board were challenged the minutes are part of the record but so is the
[28:15] video is a video so all of that could be provided to the court or a transcript of
[28:20] the video could be provided to the court um so we don't lose anything from a you
[28:25] know record perspective by by not including including the summary in the
[28:29] minutes um and then there's of course for the benefit of the public
[28:33] um it's you know same for for your considerations um if you want
[28:38] description in the you know narrative description in the minutes versus uh
[28:43] going to the videotape yeah are there ever guidelines about um ways to avoid
[28:49] editorializing by the way you summarize the minutes you understand what I'm
[28:52] saying like selectively uh pulling out agenda items right which happen you try
[28:58] to paraphrase public comment you may not capture you know but also Mr Mr Smith
[29:05] made a PO comment right but also it might be useful for
[29:10] the Casual person or whatever to be able to understand uh to track the discussion
[29:15] right or maybe the best thing is to go to the video though because the video
[29:18] would reflect the more accurate version of everything so it's probably more
[29:23] advantageous to point to the video to avoid any discrepancy I think so yeah as
[29:29] opposed to language tone inflections which can't be reflected in the
[29:33] minutes which can't be seen in the videoos so I mean some people make the
[29:38] effort but there's a point of how it's it's a slippy slope of you know if you
[29:42] miss something you don't miss something perod and the Comm in the wrong place
[29:46] could be the difference so poin to the videotape I think is PARTA of the best
[29:50] so for the purpose of our business can I have a motion to approve with the
[29:55] modifications the minutes for September 10th 2024 motion can I have a second
[30:01] second all in favor I I was
[30:08] second so August Parks okay so we're going to
[30:13] go to our regular business today did was there Jennifer was just going back to my
[30:19] my vide tape in my mind okay we're good um we're going back to item number one
[30:25] continue public hearing and continue review of application for site plan
[30:28] approval and subdivision approval 19 Henry Street Town Home submitted by
[30:35] Larry Joseph Builders now I believe last meeting there was a um uh to have you
[30:42] prepared the document yes yeah so at the last meeting the board um directed my
[30:47] office to prepare secret documents for your review for tonight um you do have
[30:53] those before you you have the short form part two that's been filled out for you
[30:58] review and then part three with um The Narrative that's been attached
[31:03] supporting a negative declaration finding there's no significant adverse
[31:06] environmental impacts um and this is available on the website um and was
[31:12] circulated to the board a few days ago okay excellent so can I have a motion to
[31:16] open the public hearing motion well before we before we do that you should
[31:21] act on secra first so just as far as sequencing goes act on secra then we can
[31:26] um uh basically reopen the site plan public hearing that's currently uh
[31:31] extended from last month and then you have a subdivision public hearing that's
[31:36] going to be opened brand new tonight okay excellent so
[31:41] um let's go to comments on this first um on item one bear with me for a
[31:51] second yep I can start um I just had one uh my last letter from last month was
[31:56] that all comments had been addressed um I just had one comment on this plan um
[32:01] when looking at the photometrics I saw something I had missed before that it
[32:05] looked like the max lighting level was saying 10.3 foot candles um but I didn't
[32:10] see that reflected in the photometric so I just thought that was a a probably a
[32:14] point of correction Michael speak to that yeah
[32:18] okay just cuz that is kind of bright so I was wondering where was on the site
[32:22] it's it's not a typo it's actually the the brightest light directly beneath
[32:27] those lights only 8 ft High they're in that little vestibule area so they are
[32:32] hitting that Bri right there front of the property right not yeah no not
[32:37] anywhere near the property it's just directly it's the front porch is what I
[32:40] think is the front porch yeah the front porch like okay I well I just so that is
[32:44] a high level but if it's right underneath it and it's kind of enclosed
[32:47] then I guess that makes a little bit more sense and then there is no Lighting
[32:51] in the rear they're not proposing any rear lights well aside from like a
[32:55] normal light you would buy at Home Depot over your slider you can't model those
[32:59] twinkle lights or yeah okay yeah okay yeah that was the only thing that I was
[33:05] that I was noting is that um I mean the overall lighting levels on the site
[33:09] right are if you average it all out are 027 and that's foot candles and that's
[33:13] the stipulation with the code that those should not be higher than one so they
[33:17] are meeting that um 10.3 is kind of bright but if it's at your front door um
[33:22] I think the applicant could probably make an argument for why it's that
[33:26] bright at the front door but um that was my one comment is I I had noticed that
[33:31] kind of higher level of a Max there I think the other benefit is that
[33:36] it's in the front of the property it's not in the rear I you know I wanted to
[33:39] make sure it wasn't in the rear property kind of looking into The Shining into
[33:42] the backyards of the neighbors or anything like that so that was the my
[33:46] one comment okay so in but in light of it being not a not a typo are you
[33:52] comfortable with I just want to make sure cuz yeah I mean I don't there there
[33:57] is no regulation the code that really talks about that max level their average
[34:02] is meeting the code requirement um I think what we've talked about in the
[34:06] past on site plans is you know anything over 5 foot candles as often you start
[34:11] to feel like you're indoors right um so just asking the necessity of that so I
[34:17] think we would balance that higher level with need for safety um if I don't know
[34:23] if the applicant wants to speak to that more but that would be that would be my
[34:26] comment okay so can can we just get to just to make sure we clarify that and if
[34:31] the applicant wanted to speak to why it's so bright I think i' I'm just going
[34:36] to infer but I believe it's proximity to the parking lot across the street it's a
[34:39] pretty you know busy area I think for purposes as was point about the planner
[34:43] it's specifically over the entrance way so I think that was the limited knowing
[34:47] that it's supposed to be walkable we're encouraging all that I think it's like
[34:50] anything else it's just the the front door and it's not extending to the
[34:53] property line it's it's just over the the front entry okay yeah I think it's
[34:57] important part it is it's not um it's not transferring any kind of glare or
[35:02] light levels over the property line so is it like a just a regular porch light
[35:07] or is it some high intensity outdoor
[35:12] light it's it is it's a it's an LED light it's
[35:16] 3,000k um I think 15 watts it's the smallest light we could find to model so
[35:23] it's not it's not like these sodium highlighted lights you see in a it's
[35:27] like a standard household light over a door okay thank
[35:32] you so I have a few comments with regards to the subdivision plant that
[35:36] was submitted um I know there's going to be access easements around the sides of
[35:41] the buildings to allow the uh homeowners that are located in the center to have
[35:47] abilities to get to their rear yards but the question was are what if people
[35:52] install fences are we going to prohibit F uh people from installing fences along
[35:56] their rear yard are property lines running to the back lot or are they
[36:00] going to be required to have Gates put in
[36:05] um the other two with regards to the Subdivision plat are just cleaning up
[36:09] the easement drawings that were on the plans to eliminate um
[36:16] crossover uh then with regards to the plan uh there's a minor correction that
[36:21] has to be done on the tree planting de uh detail and then I was thinking a note
[36:26] should be added to the plans with regards to that the homeowners are
[36:30] responsible to maintain the trees on the respective parcel and to replace it if
[36:34] the tree dies or is taken down um you know if they're going to provide
[36:38] screening to the neighbors it needs to be maintained for
[36:41] longevity we have no objection to all those we didn't sorry to interrupt we we
[36:46] we intend to include those including a note saying no fences you know or to the
[36:50] extent practicable a gate is necessary private easement rights would also apply
[36:55] so no one could do that or if somebody it would be A Private Matter between
[36:59] parties right I'd hate to see one of the Interior homeowners have to try to come
[37:04] around the back and they can't get through off so we'll add a note to that
[37:07] effect or emergency responders firemen there may be windows that are
[37:12] required for fireman access in the rear I don't know I just wanted I want to ask
[37:17] how is the tree situation normally handled I mean it's these are town
[37:21] homester There's not going to be an HOA right there's really nobody else we
[37:25] could put the burden on right these are going to be individual
[37:30] simple they're going to be individual Lots so they are controlled the only
[37:33] access easement was just so that if you had a lawn mower or something you wanted
[37:36] to swing around the back that there was no the people in the middle couldn't mow
[37:39] their lawn you know it was just that was the the limitation there so it would be
[37:43] on the proper the respective property on each lot will be responsible well I mean
[37:46] it's a matter of property right if the easements the access easements are
[37:50] recorded So is the site plan so the site plan is there it'll be notes on the site
[37:54] plan if they're not there they're in non-compliance with the site plan the
[37:58] building department can issue a violation it'll be on file with the city
[38:02] of Beacon so okay if the easements are recorded for
[38:08] Access for the adjacent land owner or you know adjacent Town Home Access is a
[38:13] legal proposition we've taken care of it it should we be doing anything more here
[38:19] to make to try to avoid this being an issue if I may we've seen we've seen
[38:23] instances where neighbor where we've installed trees on a neighbor's property
[38:27] right rather than on our own and then there there's a different set of
[38:30] responsibilities so there may be agreements like that these are installed
[38:32] on the property so they will be a site plan condition and enforcable so
[38:36] neighbor a says tree B fell the building department can say it's on the site plan
[38:40] you as the owner are responsible for replacing it the only other instance
[38:43] where you'd have something recorded like that is typically if you're doing it on
[38:46] someone else's property but you're absolutely right if there was HOA or
[38:49] other management structures you could do it that way but the site plan is is
[38:52] another enforcement mechanism for this specific purpose it's not always a
[38:56] requirement that the trees be maintained but the board has thought that condition
[39:00] through because of the neighbors comments and are are considering so
[39:03] we'll be on the site plan and we can note I think we already have noted that
[39:07] they need to be
[39:15] replaced let let is going quick no comments no questions on the short form
[39:21] of the narrative for secret I'm fine thank you okay so we can
[39:28] make so yeah yeah so next step would be a motion to adopt the secret negative
[39:34] declaration um and then you can go ahead and open the public hearing open okay
[39:38] can I have that motion motion I have a
[39:44] second a second second second okay second yeah okay all in
[39:52] favor yeah yes get everybody flaged
[39:59] all right um can I have a motion to re cuz we're reopening this from um the
[40:05] site plan the site plan Public public hearing but we're also opening the
[40:10] subdivision and we can do them both simultaneously okay okay so I'll move to
[40:15] reopen site plan approval on the application as well as open the public
[40:19] hear reopen the public hearing on site plan approval as well
[40:24] as opening review on subdivision right or
[40:28] on the subis right that's your motion second all in
[40:35] favor good
[40:39] evening for the record Taylor Palmer I'll keep this very brief as the board
[40:42] had a good discussion of what we're here for as mentioned we are continuing our
[40:45] site plan public hearing and also opening the subdivision uh aspect for
[40:48] these four uh two-story attached Town Homes at 19 uh Henry Street for the uh
[40:53] record and for the public we did update the notices and all the mailings for the
[40:57] new public hearing for the subdivision um we did provide a comprehensive
[41:00] summary of the project at our last meeting but I'll give a quick uh
[41:03] overview for the benefit of this evening our supplemental submission dated
[41:06] September 24th uh included additional refinements to that site plan and
[41:09] Subdivision plat many of the comments uh which you just heard from your board but
[41:13] specifically the changes from our last meeting is we did update a planting plan
[41:16] to include seven thua giant uh Green Giant uh trees along the rear property
[41:21] line uh which would provide screening for neighbors that were previously uh
[41:24] proposed red Maples uh we did revise the plot to include references to the
[41:28] drainage easements uh and the proposed lots for underground roof drain pipes as
[41:33] well as The Pedestrian easements that we just discussed with the board so those
[41:35] were the the changes responsive to board and member of the public uh that had
[41:39] spoken at the last meeting so that's thank you thank you um let's just is uh
[41:45] anyone here from the public for this particular
[41:49] application
[41:53] thank Teresa craft since this public hearing was re opened I'll make that
[41:58] comment um I'm still opposed to this type of housing on Henry Street location
[42:03] and I don't want to see this type of formula used throughout the rest of the
[42:07] city of eacon um the neighbors the current
[42:11] neighbors behind around will be forced to live next to 8 to 20
[42:16] people and uh this will impact their quality of life but I also want to say
[42:22] that this could all become airbnbs so you'll have no control over any lighting
[42:27] noise anything that comes into there I think the city is has like 60s something
[42:32] registered airbnbs and we all know that there's hundreds throughout the city I
[42:36] believe this will happen there too thank
[42:40] you anybody else for the public for this so leave it open we should also
[42:48] mention the um email comment that you yes yes yes yes
[42:53] yes there were two okay if you want to yeah sure so um
[42:59] the board did also receive uh by way of public comment uh written comment sent
[43:04] to Mercedes press who circulated to the board members from the neighboring
[43:08] property owner at 21 Henry Street um and the the the comments are part of the
[43:16] record but um essentially I think the the main gist of the comment was uh
[43:22] discussing the the setback between the two properties
[43:29] thank you let's just go around the board real quick s
[43:35] that I I don't really have any comments you on what I said before we open the
[43:39] hearing so you know I have to tell you I had a
[43:43] belated thought but this may not be uh relevant that if the uh Paving was used
[43:51] pavers like decorative pavers with the infiltration instead of asphalt that it
[43:57] might improve the ability one of the problems one of the things that's going
[44:00] to impact this visually and probably the reaction to it is the fact that there'll
[44:04] be uh a bunch of curb cuts and driveways in an area now that just has one uh and
[44:12] um that was one way to make it lessen the visual impact but I I'm not that
[44:21] committed to it I think it' be an improvement and I would I would do it if
[44:23] I it was my project
[44:28] um so just in in regard to that public comment that we received via email if I
[44:32] remember the gist of it the concern was that the uh distance between the new
[44:37] development and the adjacent property to the east I think right M was there
[44:43] anything I mean we've gone through the required setbacks and the site plan no
[44:49] they are zoning compliance yeah so
[44:53] yeah that's it that's it that's all I have thanks I don't have any any other
[44:57] comments that the only thing that's different is that it's a subdivision
[45:01] approval this week I feel like we we review the design issues to date and um
[45:08] so I have no further comments okay thank you and just going back anyone else from
[45:13] the public want to make any comments on this at
[45:16] all okay so at this point we can close the public hearing give a motion motion
[45:23] to going back to close the site plan public hearing site
[45:28] plan and the subdivision public site plan and the subis subdivision public
[45:33] hearing seconded by Len all in favor I I okay
[45:41] now next step would be to direct my office to prepare uh a resolution for
[45:47] your next meeting have that motion motion second second all in favor I I
[45:55] [Music]
[46:03] okay now now we're done with with 1900 move
[46:09] on to the next agenda we're done make I'll sit down for a second right
[46:15] okay I'll be right back I'll be right back all right we move on to item number
[46:19] two Contin
[46:24] review Contin review of application for site plan and subdivision approval mixed
[46:29] use commercial and residential 45 beatman Street High Street and High
[46:33] Street submitted by beakman Art Center LLC and Bay Ridge Studios LLC hello
[46:40] again good evening again acting chairman for the record uh Taylor Palmer with the
[46:44] law firm of c and fader on behalf of the applicant uh tonight I am joined by our
[46:47] project architect ra seagull whose anniversary is tonight oh happy
[46:51] anniversary right we always join each other on Valentine's Day and
[46:54] anniversaries it's it's becoming too much um AR I don't know where we're
[46:57] going tonight but I guess um myam um our project engineer is
[47:04] Justin dates U of cers and Rich de Andrea also from cers for our traffic
[47:08] consultant so um uh as the board is aware at our September 10th meeting uh
[47:12] the planning board referred this to the ARB subcommittee uh for the review and
[47:16] our architect met with that committee uh yesterday uh to review the project in
[47:20] Greater detail uh to assist the ARB and its review our most recent submission uh
[47:25] some of the pretty pictures that are up on on the screen uh included some
[47:29] additional photo realistic renderings uh that included views of the
[47:33] project from beakman Street and High Street uh and now shows a Stairway at
[47:37] the end and of course Arya will walk through uh some of these details uh at
[47:41] the end of High Street Building on to beakman that was one of the requests
[47:43] from the board uh in our discussion and we also have the route 9d with City Hall
[47:47] in the background some of the renderings you'll see tonight have also been
[47:49] enhanced further to also represent uh other development in the area including
[47:53] the view uh Beacon views excuse me West End lofts uh and some of the other
[47:58] development in the quarter and we're going to start to work on the other side
[48:00] of uh of 90 as well the renderings were designed to demonstrate how the
[48:05] buildings are intended to relate to the existing buildings in the surrounding
[48:08] area and the use of their materials proportions and scale uh as well so as
[48:13] ra will show you all in just a minute again as I mentioned we did update uh
[48:17] you know the visuals to include uh some of those additional development in the
[48:21] area our submission also included an updated inii report and Landscaping plan
[48:26] uh as well as a parking memo uh that was updated by Mr Deandrea the inii report
[48:31] confirms that uh the site observations and testing have not revealed storm
[48:35] water connections to the city's sanitary sewer system um and as Justin we riew
[48:39] with the board in a minute the updated Landscaping plan demonstrates that the
[48:42] project has been refined to try and response to the board comments and
[48:46] surrounding streetscape uh to enhance the visitor experience so I'll let those
[48:50] guys talk about the specific updates and then Rich will um briefly
[48:55] speak to uh the parking memorandum which was adjusted to reflect the city's new
[48:59] parking regulations that were adopted uh and how the property still complies with
[49:04] those um regulations now it wouldn't be an anniversary I didn't hop on my soap
[49:09] boox for a minute here um and say one thing while the acting chairman is here
[49:12] Mr chairman is probably going to watch this at home um I did just want to
[49:15] quickly note a few things um the renderings and our detailed submissions
[49:19] have been just that detailed we've made a lot of effort to date uh including
[49:23] voluntarily approaching the New York State DOT for additional approvals
[49:26] exemplary of the applicant's ongoing commitment to constructing the best
[49:30] project possible uh our efforts reveal a clear intention to give the property new
[49:35] life and create a new opportunity for the city's downtown area while certain
[49:39] comments at the planning board's meeting last month May downplay these efforts
[49:42] these comments did not fairly provide a reasonable context for what the
[49:45] application is proposing here and the vision that was set forth in the city's
[49:49] comprehensive planning documents and has been meticulously detailed in our prior
[49:52] submissions to say that those first renderings have uh a evolved over a
[49:57] series of months is to that excuse me to say first issue renderings that have
[50:02] evolved over a series of months is a missed opportunity ignores the reality
[50:06] of the situation the applicant finds itself in the only missed opportunity
[50:09] would be if the applicant didn't breeve new life into this site this
[50:12] underutilized property the applicant is creating a new opportunity at this site
[50:17] one that the developers and the prior owners couldn't achieve he's working
[50:21] with the New York State Department of of of transportation to take back what
[50:24] urban renewal took away to give that back through reimagining
[50:28] re-engineering this prominent Corner that has been seen uh multif family
[50:33] development all around it including new city hall and the fire department uh the
[50:37] project is and will create opportunities to realize these Visions set forth in
[50:41] your comprehensive plan and is to create linkages to Main Street and the train
[50:44] station we hear the words iconic and we think of Taj Mahal the Eiffel Tower Big
[50:50] Ben the Empire State Building those are iconic buildings well this project and
[50:54] the beacon architect I should say remain committing to making this big little
[51:00] Beacon or beak Empire State Building um it's made by beaconites for beaconites
[51:05] and most importantly it's been designed and refined throughout this process and
[51:09] we're by no means done but I think it's important to address those comments
[51:12] because this project is continually committed to it and we want to make sure
[51:16] it gets there we know the ARB just got its hands into it but we thought it was
[51:19] important to address that thank you
[51:39] good evening so um yeah I just wanted to mention that we had a a very good and
[51:45] productive meeting with uh Natalie in the ARB subcommittee yesterday um that
[51:50] there was you know specific recommendations that we're looking at
[51:54] incorporating into the design um we we're also re visiting the
[51:59] connection at the um just get the landscape drawing up
[52:08] here at at the corner of um 90 and beakman where and and I I spoke to
[52:15] Justin about it uh this morning and we think we have a way to approach that so
[52:21] we we can connect that corner and and the plaza there to the corner of the
[52:25] building and um you know make make that work
[52:28] better um and then basically on once the design
[52:33] is updated um we'll go back to the ARB and continue to you know work out the
[52:39] details on that end um I just show you updated renderings that as Taylor
[52:46] mentioned has a little bit more context um in that connection can I interrupt
[52:51] you and ask a question real quick it um those rendies uh
[52:57] on sheet five towards the bottom we've got
[53:01] elevations on the building um
[53:06] yeah and if you zoom in the the bottom line is the corner feature on both of
[53:14] the buildings is different on that elevation than it is
[53:19] on the the the renderings that follow the diff you know whether it's a pointy
[53:24] top Tower or whether it's a glass yeah I have my little uh caveat note on
[53:30] the bottom of the page there that that that was just really intended to show
[53:34] the scale of the um the the building as as the you know as you see it cut
[53:40] through the sidewalk so okay the one in the rendering is what you're on right
[53:44] now yeah okay that was the question
[53:49] yeah um yeah so the the these this version of
[53:55] the renderings with the to additional contexts were not submitted um but we
[54:00] did review those yesterday and you know they they do show the buildings with
[54:05] some of the other developments around and and maybe just for people who
[54:09] weren't who didn't have the context to the comment you were talking about was
[54:13] to to make the arcade accessible from the corner of beakman and 9d and that
[54:17] Plaza area were right so that there's a a good pedestrian access to try to get
[54:22] that space yeah and and and that that's what I uh spoke with um Justin about
[54:27] today we we're trying to figure out a way to work with the grading cuz it's a
[54:31] little difficult over there it's the dot property there's some uh utilities under
[54:36] there but we I I think we came up with an with an approach and then that
[54:41] that'll be shown on the next submission um just a quick question when you say
[54:46] utilities is that are there like manhole covers that you would have to extend I
[54:49] that sort of thing there pipes under there
[54:53] or there's existing uh storm motor sewer come through like so you'd have to build
[54:59] a structure to there's no no structures or Ties That proposed it's just there's
[55:04] existing pipes there that are roughly I believe like 10 ft down so we're really
[55:09] trying to minimize any more fill that we would put over top of that then it's not
[55:13] so because there's two things that I thought of which I I'm just is that if
[55:17] there is a roadway it requires different fill and it then for the building right
[55:22] they require structural fill or something right if you put a on-ramp
[55:25] there you don't want to do that it's not part of your scope I'm
[55:29] assuming or they or the city would the state would have to do that later the
[55:33] other issue would be the um uh uh you'd be doing work on state
[55:39] property right that you'd have to get the approval and go through State
[55:43] approval process because I I think it's a big I personally it's it's an
[55:48] opportunity and I'm I just want to find out how difficult it is to to take
[55:53] advantage of it yeah so two two things so as far as
[55:58] the the future T Lane and the sketch that we showed several several months
[56:03] ago we looked at that actually today just to see how that would fit with what
[56:07] we're talking about on the corner now it would work went have to massage it a
[56:12] little bit and just make sure that it works now and works in the future if
[56:16] that ever that right turn Lan does go ahead um but there's plenty of room to
[56:19] do all that um and we'll show that sketch just probably next month um the
[56:26] other piece that you're talking about about can you use that area for to do
[56:29] these things and what does the do would need because it's on their property uh
[56:33] it's it's all doable from what I see um it's mostly just Hardscape kind of
[56:38] sidewalk type treatments right so and Landscaping all those things to
[56:43] typically allows in there right away it's when you get into larger structures
[56:46] where and and more permanent structures that you have more of an issue right so
[56:50] um I think we'll have to go through an approval process with do for this
[56:54] obviously but from what I see in my opinion it's all it's all doable and
[56:59] typical for stuff that can be done in the do right away because I I I I don't
[57:03] want to suggest something that's impossible to do sure but I think
[57:05] there's a public interest and I think the state might want to help in some way
[57:09] in order to make that part of their easement and that part of the city plan
[57:13] more publicly accessible that broader area to allow for that uh turning lane
[57:18] later and also the the the the um pedestrian connection up 90 right
[57:25] towards the bridge to still be continuous and uh and pleasant you know
[57:30] to improve the the the The Pedestrian experience in that whole area and if
[57:36] there's a way to plan it out where you're not because I understand like
[57:39] trying to avoid engaging other agencies and other things that's that's
[57:43] completely understandable and and also things that you don't have approval for
[57:47] you can't get right if if you don't that that's understandable as well but I
[57:51] think we should really try if we can to make that portion of the Street uh um uh
[57:59] because the turning lane may not ever happen so that in both uh scenarios
[58:04] either there is an ATT turning lane or if there is ATT turning lane that that
[58:09] The Pedestrian experience isn't sort of a precarious forgotten No Man's Land
[58:13] right right absolutely yeah I think that makes total sense and the idea would
[58:18] also be that if the right turn lane did happen that you're not reconstructing
[58:22] the entire thing also right right I'm not you know I don't think anybody wants
[58:26] to do unreasonable things but you don't want to preclude improvements later
[58:31] right or a better situation later or you don't want to take advantage of the
[58:35] opportunity now if if if uh uh there's uh um ways for Street improvements to be
[58:43] funded you know that aren't you know necessarily your your area of
[58:48] responsibility
[58:54] okay yes I think I think that's sort of the update on the uh on the design end
[58:59] so we're we're we're going to work on those items um and and you know
[59:03] definitely work on weaving that corner together um and then we'll be back with
[59:09] more next month and back to the uh ARB as
[59:13] well
[59:21] thanks business I think I was just going to give an update on the just the the
[59:26] parking memo and and some other updates on dot that we didn't talk about so um
[59:31] we did we were asked last month to provide just the an updated parking
[59:35] analysis based on the changes that were done in the uh the change the adopted
[59:39] the new adopted parking code um so we went through that uh it doesn't
[59:44] drastically change the anything in the analysis necessarily but really the code
[59:49] now specifies that the parking standards that are in the code are now a maximum
[59:53] parking standard for the for the site um so when you look at that now the 109
[59:59] spaces that were required before are now the 109 spaces that are now a maximum um
[1:00:04] we then you know still did our shared parking analysis that was done before
[1:00:08] it's the same analysis um at the end of the day we're still looking at 88
[1:00:12] parking spaces uh being what we feel is the appropriate number of parking spaces
[1:00:16] doesn't take any credit for the proximity of the train station
[1:00:21] bike usage any of that it's just straight parking shared parking analysis
[1:00:26] based on utilization of the different uses at different times of the day so um
[1:00:30] that we we kind of feel that 88 parking spaces is still the appropriate number
[1:00:34] of parking spaces for the site um and then just to give you an update on a
[1:00:39] couple other things on the dot end of things so we had been talking about for
[1:00:42] a couple months having a call with DOT we finally were able to make that happen
[1:00:46] about two weeks ago um there's we're still waiting for some formal feedback
[1:00:52] from them after that which we were hoping to have before this meeting but
[1:00:56] we haven't received yet um couple things that came out of that uh generally dot
[1:01:00] was in favor of the timing and phasing modifications that were recommending for
[1:01:04] the intersection um but one thing that I did find out that wasn't was new
[1:01:08] information to me was that the state actually has an Adaptive traffic signal
[1:01:12] Software System that's in play at that intersection and going up 9d um it's not
[1:01:19] functioning at the moment but it's it's it's installed so they're working on
[1:01:23] getting that functioning um so that may change things a little bit so they were
[1:01:28] going to give us some feedback on that uh when they provided their written
[1:01:31] comments um the other thing that they did note is that there is no adaptive
[1:01:37] traffic signal software at the Main Street intersection so that may be
[1:01:40] something that they're looking at as well and I'm not sure if you guys know
[1:01:43] what adaptive is okay I so just to to to step back on that so adaptive traffic
[1:01:49] signal software is is it's an additional software that gets added onto the
[1:01:52] traffic signal controller that really allows the signal to better adapt to
[1:01:56] surges in traffic right so specifically you think about the train station when
[1:02:00] you got a surge of traffic coming out of the train station the the signal can
[1:02:04] actually learn that over time so every day at 5:15 the train comes and there's
[1:02:09] a surge of traffic the signal can learn that over time and be ready to adjust
[1:02:13] for that ahead of time and it look can also communicate with other signals that
[1:02:18] have this software um along the corridor and help to move traffic through the
[1:02:22] corridor to get is it video there's already video out there if you look out
[1:02:27] there there's a camera looks like a a bell camera um so that there is video
[1:02:31] that's involved um and that's just the the detection portion of it and then
[1:02:36] this is just a like it's almost like an AI software it's not exactly that but
[1:02:40] it's kind of like that um that is in the controller and and really functions as a
[1:02:46] addition on top of what is typically done is like a a Time based timings
[1:02:52] right so at this time of the day we're going to run 30 seconds on this one pH
[1:02:57] phase this one approach and 20 seconds on the other approach right now with the
[1:03:03] Adaptive there really isn't necessarily a timing that's associated with it this
[1:03:08] this the program has the ability to just kind of modify things with in within
[1:03:12] some parameters really on the fly as uh traffic surges change on different
[1:03:17] movements and approaches and is that all the way up to the bridge lights it goes
[1:03:22] all the way up to the bridge lights yes now again I don't I don't think any of
[1:03:25] it functioning at the moment but they do have it in
[1:03:29] play I would agree not lately no I I wonder if it's similar they have in tall
[1:03:35] buildings elevator Banks they have similar demand managementof very similar
[1:03:40] right similar idea right so so that that was something that was that was that I
[1:03:45] had not was not aware of until we had that call um so that'll be part of all
[1:03:50] part of what we're doing here um we did discuss the know the future
[1:03:55] right turn lane uh do is in favor of it they we told them look it's not part of
[1:04:01] our proposal for this project do indicated they have no Monies to do it
[1:04:05] themselves so it's just kind of a how do we get that accomplished in the future
[1:04:10] if that's something that the city wants to see um and then lastly you know we've
[1:04:16] been talking about the land acquisition um for the frontage there dot is just
[1:04:20] going through a detailed review now of um their in internally of of that right
[1:04:27] away that we're looking to acquire um and once that's complete they'll let us
[1:04:32] know that everything's good and then it'll have it has goes through a process
[1:04:35] up in up in Albany so there's some still some work to be done there but it is in
[1:04:40] in the process how long does that process take
[1:04:43] Rich once you come to Aly well we started that when we start that in
[1:04:48] August Yeah well yeah but when we made the
[1:04:51] last June maybe yeah so we had a call with another call with them in August is
[1:04:56] what it was um it's probably close to a year by the time we're said and done
[1:05:05] so thank you so Ken worstead from kraton Manning
[1:05:11] wanted me to know he's not here tonight obviously but um he is reviewing the
[1:05:14] shared the updated shared parking memo that was provided by colar um and he'll
[1:05:19] have updated comments for the board on that and also Randall your microphone is
[1:05:24] off that's from
[1:05:28] Pete I about the uh parking study I was I thought it'd be really uh informative
[1:05:34] everybody that works so hard I know the council work Forever on this new parking
[1:05:38] and it's um it's really useful for uh to get the feedback of what the actual
[1:05:44] effect of it was what what changed you know from the studies what was what was
[1:05:49] uh what the requirements were with the old code and what they are now this is
[1:05:53] like a perfect example if it probably wouldn't be that tough you probably have
[1:05:56] the numbers in the back of a legal pad or something of like how how your design
[1:06:01] changed because of the code the new parking regulations and also how it
[1:06:06] affects you know then you could extrapolate how it would affect uh
[1:06:10] parking supply and demand going forward for other developments right yeah I mean
[1:06:15] for this specific development I don't know that it really changed much right
[1:06:20] because the standards kind of went from a minimum to a maximum oh got okay right
[1:06:26] when you get to other and I'm sure we'll talk about this on other projects going
[1:06:30] forward when you get to other areas of the city where you have a minimum and a
[1:06:33] maximum that's that are both identified right now you have to fall within that
[1:06:38] that range and we have to really show how we think that the number we come up
[1:06:44] with is the number right then it's up to you guys to
[1:06:47] decide what's the were you seeking you were seeking a waiver under a prev right
[1:06:52] cuz you weren't meeting the minimum before there wasn't ly we were
[1:06:56] requesting a waiver for the reduction parking from the 109 to the 88 based on
[1:07:02] shared parking and so now you no longer have to I mean that would be a change
[1:07:05] you didn't change your design but you no longer have to seek a waiver for that
[1:07:09] but it is still the planning board's decision so it's they're allowed to have
[1:07:13] a maximum of 109 spaces right but they're presenting that 88 is the right
[1:07:19] number but ultimately that's your decision whether 88 is the right number
[1:07:22] or not I think to that point it would be helpful I you know I I understand like
[1:07:26] the use of it standards and the shared parking agreement but I think it would
[1:07:29] be helpful for the board to understand how those 88 spaces will be managed
[1:07:34] right so you have 64 apartment units just under 15,000 ft of commercial so
[1:07:39] like is the intent to advertise these units as one car space per unit right so
[1:07:46] that's 64 and then the other 22 spaces are going to be dedicated to employees
[1:07:50] of the commercial space or where will visitors you know like just to how it's
[1:07:55] a little bit down the line I think in thinking about operation but um how you
[1:08:01] intend for that to like actually function you know on once this building
[1:08:04] yeah I think we we can we can talk to you know our client about that a little
[1:08:09] bit more um but the way that shared parking works right now is it assumes
[1:08:13] that all the spaces are shared between the residential and Commercial so that
[1:08:17] you don't plan to mark them at all in terms of these are residential yeah
[1:08:21] they're just first come first serve cor okay um and then the other piece think
[1:08:25] in terms of like I don't know if the board has questions about the 88 but if
[1:08:28] we start to get there I think the other aspect in the new zoning code um is
[1:08:32] looking a little bit more away from the standard it standards and then instead
[1:08:36] trying to reference local developments right so if you see other residential
[1:08:41] units at these price points that are currently functioning what's the actual
[1:08:45] utilization rate that they're seeing in their parking facility there you know I
[1:08:48] think that kind of information will be helped especially if you can find
[1:08:51] something approximate to the train station to show okay these two bedroom
[1:08:55] unit are actually only using one point whatever space per unit and I think that
[1:08:59] would be a helpful comparison wait flip side of the coin here um precisely
[1:09:05] because we're this close to the train station 10 or 15 years ago I used to be
[1:09:08] able to like Drive I forget the name of the street but like four blocks up the
[1:09:12] street from the train station and park and tons of people were doing it and
[1:09:16] then finally one day the city came in and expanded the 2hour only or 4H hour
[1:09:20] only whatever it is parking sign so you couldn't do that anymore if you're not
[1:09:24] doing something to restrict two parks there how are you going to keep people
[1:09:27] from me from parking like me from parking in your parking lot and
[1:09:30] commuting on the train well there's still going to yeah
[1:09:34] there's still going to be no parking signs for like nonusers I'm sure you
[1:09:39] know if you like if any other owner of a property if they saw somebody parking
[1:09:43] there and walking clearly walking to the train station you would go have that car
[1:09:47] car tow right so um if you tried to get a car tow in the city of
[1:09:51] be they won't the tow companies don't want to tow unless they're a tiet on
[1:09:56] there and a police officer directing to they're concerned about getting charged
[1:09:59] with auto theft literally I had a car stuck on my in my driveway I couldn't
[1:10:04] get
[1:10:08] Toad I I don't want to get too far ahead of probably going to buy a lot of those
[1:10:13] stickers that they stick right on the driver side window and take forever to
[1:10:16] get off I know that my landlord used to do that and it works very
[1:10:20] well the new city and orange can't get that off with Gooby gone or anything
[1:10:24] those things stay on there forever but we'll we'll look at
[1:10:29] seriously we'll look into that whether it's enforcement you know whether it's
[1:10:32] they have to be out there and you know monitoring but it's it is private
[1:10:35] they're going to want their commercial tenants to be right functional and
[1:10:38] usable and yeah I just I I know for a fact this
[1:10:41] has been an issue with anything that's walkable to that train station I
[1:10:48] mean yeah I I I can go quickly over the comments cuz I think um I really only
[1:10:53] commented on kind of architecture and Design
[1:10:56] and then the kind of streetscape landscaping improvements and I think
[1:10:59] we're trying to nail that down before we go deeper into into the other design
[1:11:04] aspects so um I think the main my main two points 1 a and 1 B have kind of been
[1:11:10] touched on um it's really focusing on as it should be I think the focal point of
[1:11:16] this development is the corner right and we're using the Clock Tower and
[1:11:20] everything to make that a focal point but as we've touched on if I'm somebody
[1:11:24] walking towards this building and I see this focal point I can't get to it
[1:11:28] directly I have to kind of maybe go down and like find a way around so I love the
[1:11:32] idea that you guys were adding a little bit of like a pocket park Sculpture Park
[1:11:36] kind of situation there if that could instead be some kind of entryway and
[1:11:40] maybe that's what makes it more of a grand like an entrance like I just think
[1:11:44] that if you're going to if the architecture stays the way it is and you
[1:11:47] are going to highlight that corner there should be a way that should be like the
[1:11:50] entrance to the yes they're looking at the grading and that's being worked into
[1:11:53] the design yeah and so that that just ties into you know the the section in
[1:11:57] the code talking about storefront entrances should be prominent and easily
[1:12:00] um identifiable and I think accessible and that kind of comes into the other
[1:12:04] piece and we ar we talked about this a lot in the in the ARB session so I know
[1:12:08] you're thinking about it but I think that other aspect of storefront
[1:12:13] entrances being prominent and easily identifiable um the heaviness of the
[1:12:18] ground floor architecture with the with the arcade um while an interesting
[1:12:24] architectural feature I think it is making the entrances to the storefronts
[1:12:29] feel a bit recessed and kind of back um so what how would the businesses in
[1:12:35] there be identified how would people know you know like that maybe it's
[1:12:37] signage maybe it's kind of lighter whatever but I feel like that section of
[1:12:41] the code talking about these various commercial entrances being clearly
[1:12:46] identifiable I think that's getting a loss a little bit behind the heavy brick
[1:12:50] so that was one of my comments there um material color shall complement the
[1:12:56] historic buildings of the block so I think we talked about this a little bit
[1:12:58] too of there's a few different architectural features in here but I
[1:13:02] focus on the brick and the color of the brick that I think you know what's what
[1:13:06] we typically see is kind of material boards and maybe this will happen once
[1:13:08] we get a little bit further down but like a material board so we can see
[1:13:11] exactly what the color of this brick is going to be and kind of see it in
[1:13:14] comparison with the sample of the metal or the glass aspects of it just so we
[1:13:19] can yeah that'll be ra will definitely bring that to ARB see that and then the
[1:13:23] fourth piece while it doesn't necessarily tie Direct directly to a
[1:13:25] section of the code this was talked about in the ARB um work session so the
[1:13:30] code and I see what you're trying to do here cuz the code does say right in the
[1:13:34] linkage District larger buildings have to incorporate significant breaks and
[1:13:38] like play in the facade to try and break it up so I see that's what you're trying
[1:13:42] to do with the difference of materials and pushing in and pushing out and I
[1:13:46] think my one comment is that right now it feels like there it's a little bit um
[1:13:52] it's a little bit overwhelming that there's maybe too much of that and I
[1:13:55] think maybe we so maybe we corrected we overcorrected to try and add that
[1:13:59] variation I think what we talked a lot about in the ARB session was
[1:14:04] establishing a little bit more of a consistent Rhythm so that people can
[1:14:07] kind of Follow that along I think you can still keep a lot of the breaks and
[1:14:10] stuff that you're having but um maybe a little bit more of a smooth Rhythm
[1:14:15] between them I think would would help improve that so that was it on the
[1:14:18] architecture piece for now um the streetcape I know I keep having comments
[1:14:24] about The Pedestrian clearway and kind of cross-sections and now I'm realizing
[1:14:28] maybe cross-sections aren't the best way to get at it um your renderings are
[1:14:33] really nice right and very detailed and so maybe once the architectural there's
[1:14:38] just some key points because of the change of grade of this site um that
[1:14:43] you're working with that I think there's key points where we're really going to
[1:14:45] want to zoom in and see what it feels like to be a pedestrian on that sidewalk
[1:14:51] there you know it's like maybe where the Gap is where you're doing that like the
[1:14:54] Landscaping bio like what you know give us a sense of what that looks like um
[1:14:59] maybe in one of the renderings I think this corner this front corner piece is
[1:15:02] one of those other sections so you gave us those two cross-sections that you've
[1:15:06] kind of been giving us the whole time um and I you know I still feel like it's
[1:15:12] kind of difficult to I know the site varies a lot throughout that so it's
[1:15:16] still a little bit hard to kind of feel what the pedestrian's going to feel and
[1:15:19] I think you can maybe do that with some of your the really great renderings that
[1:15:22] you do as this kind of evolves so like and connect it with the Landscaping plan
[1:15:27] so that it is actually reflective of what the Landscaping plan is and then I
[1:15:31] think that I think that's the maybe the better way to get that across and then
[1:15:35] the one aspect I just want to try I I know we clarified now and there is no
[1:15:39] trees there's no trees in the street transition zone right they're now we
[1:15:44] what we're what's being retained just so the board knows is that existing kind of
[1:15:48] decorative um it's like a decorative brick 3ft wide area is what's being
[1:15:54] retained if go back to the Landscaping plan I think that's where we see it the
[1:15:58] best there um so there's no longer any I think
[1:16:03] previously we had maybe been showing in the cross-section that there was going
[1:16:06] to be trees in the street transition zone like in between the walkway the
[1:16:10] sidewalk and the street and that's now kind of been eliminated and the
[1:16:13] Landscaping is pushed up against the building um so maybe we could talk about
[1:16:17] that because I think there was a lot of value in having a vertical separation
[1:16:21] between The Pedestrian clearway um the code doesn't allow the planning board to
[1:16:25] require Street trees every 30 to 40 ft there um so maybe we could hear a little
[1:16:30] bit about the limitations that you're working with there
[1:16:34] um and I think I think that's it for like my main my main
[1:16:38] comments right now yeah okay do you want me to touch on
[1:16:43] that yes okay uh Justin dates uh KY engineering design so just for
[1:16:51] um uh context uh the grade change from 90 on beakman down to High Street it's
[1:16:58] about 25 ft right so from Top intersection all the way down you know
[1:17:04] that's that's the Delta between the the grade so what we're trying to do with
[1:17:08] you know establishing um you know the the long uh alignment of the building
[1:17:13] along each of these there's about 8 ft of of grade change across each face of
[1:17:18] the building all right so that's why um what we're trying to do is um
[1:17:25] uh focus our our access points right now where we have it's kind of mid building
[1:17:29] you know right where you would come in you could go straight ahead to get
[1:17:32] access to the residential units you would you would uh Branch right or left
[1:17:36] to get to the uh the commercial access so what it does is is it creates
[1:17:41] situations or these triangular areas between the back of current sidewalk and
[1:17:47] the face of the building where we're trying to make up we're doing
[1:17:51] transitions right we're doing transitions of grade um because one is
[1:17:56] going you know down towards the building the other would be going up so we're
[1:18:00] using those uh and Landscaping in there to to um access that area and make up
[1:18:06] the the uh the change in grade we're doing that in in various ways with
[1:18:09] different plant species uh um mostly native uh to the uh to the region and
[1:18:16] sorry do you mean visually like you're using the plants to like kind of contain
[1:18:21] continue the play of the floor so no more so in an instance where the
[1:18:27] sidewalk is up high and we're coming down we're planting out that area
[1:18:32] because of the grade change and it's not simply going from the sidewalk and
[1:18:36] walking directly into the building right we have we that's how we're compensating
[1:18:41] for 8 ft of change across the building face right so that's why it is it's not
[1:18:48] simply just access right off of the back of the sidewalk throughout the whole
[1:18:51] arcade there um but the the the plant materials
[1:18:56] there shrubs and we um and we do have some um smaller deciduous uh narrow uh
[1:19:03] columnar horn beam if you've heard of them we're using that to give more
[1:19:07] vertical um and in my opinion it's it's it's it's a uh maturity and size of that
[1:19:14] plant fits within the space that we have in those areas uh similarly on the High
[1:19:19] Street Building we're doing the same thing so um with that building we're
[1:19:23] maintaining that kind of brick accent along the back of the curb and then the
[1:19:27] full width of the sidewalk and then we have those horn beams in um tree grates
[1:19:33] right so again that building as you go down beakman right the exposure of of uh
[1:19:39] that uh finished Flor below the arcade you know grows so we're using that again
[1:19:44] as as you know vertical vertical uh vegetation to break up that as well as a
[1:19:49] h Roll Along the the bottom again just trying to you know soften um whatever
[1:19:54] the final building facade material is uh in both those those uh those
[1:19:59] instances so typically the the street transition area as mentioned is where
[1:20:05] you would most uh where the code talks about putting Street
[1:20:11] trees um as a landscape architect I've put them further away I feel that
[1:20:18] there's more benefit um to putting them in the areas that we talked about for
[1:20:23] the beakman building and and then um the couple that were in the uh tree grades
[1:20:27] down at the High Street Building the Gap that we have in between the two
[1:20:31] buildings you know we're also proposing to put Street trees uh behind the
[1:20:36] sidewalk again because there's there's more um real estate there's more um uh
[1:20:43] planting bed area there that I feel that it's a more sustainable location for
[1:20:49] these trees if we're going to try to cram them into that small area between
[1:20:53] the building and the sidewalk I think it's detrimental to their health and the
[1:20:58] stress of those plants um so I think our proposal is not
[1:21:03] to have them in that transition area but move them further away um where I think
[1:21:08] we have a better uh sustainability of the landscaping for the for those areas
[1:21:13] are you describing what you're showing or or what you want to do no that's
[1:21:17] what's on that's what's on the plan okay yep could we have um Street trees in the
[1:21:22] brick area I would I would rather
[1:21:29] not the only reason I would give pause to that is we have a large storm
[1:21:34] drainage line right against that curb line and slightly under that curb line
[1:21:38] uh and I would not want trees on top of that line if we ever have to get in
[1:21:42] there maintain it
[1:21:46] um that could be a big concern especially if the roots start getting
[1:21:49] into those joints of those pipes and MH that makes sense
[1:21:55] just it's a long stretch with no
[1:22:01] shade you might be able to do it further down but I'm looking at the upper
[1:22:05] section being part of a conflict so which are you talking about the the
[1:22:10] beakman building the whole you know the whole walkway from High Street up to
[1:22:16] nine there's not a street tree on a shade tree there's shade trees in
[1:22:21] between the two buildings right but if you're walking on the sidewalk
[1:22:25] from they're directly behind the sidewalk so
[1:22:30] it's I would find that that that does provide shade in that particular area
[1:22:34] there okay that one little one little moment I hope you
[1:22:39] provide a lot of seating right there for we do we do we do have benches along
[1:22:44] that section uh as well just to chime into I know a lot of
[1:22:48] this conversation is going to lead into what ARB review incorporates but there
[1:22:52] were comments I think in Natalie's memorandum too potentially about seating
[1:22:54] areas benches and the like so there's a lot of that like the sort of final
[1:22:59] pieces that go into the this that will also encourage that as you go along if
[1:23:03] you needed that additional shade I mean I think that if we can look at the
[1:23:07] utility plan and find any place to put you know Street trees for shading the
[1:23:13] sidewalk that would be um important understood I think related to that
[1:23:18] comment and this has actually like specifically stated in the code that the
[1:23:21] Department of Public Works has these um um uh Street sections for this that came
[1:23:28] out of the linkage plan and it what the code says is something like that they
[1:23:34] can request that those be added so I I don't don't want to make you guys have
[1:23:37] to have a conversation with another department or division but it might just
[1:23:41] I mean to your point as well in terms of the drainage and everything that it
[1:23:44] might be beneficial to schedule that conversation as well I know dpw's
[1:23:49] psyched for us to not so they don't have to mow anymore but well I think the
[1:23:53] administrators as well because they I know he's been looking at implementation
[1:23:56] of the linkage plan you know of the linkage plan so it might just be good to
[1:24:00] coordinate on that and see what the improvements are that are being thought
[1:24:04] of or discussed
[1:24:12] there John so I just have a few minor comments
[1:24:18] as they've discussed they did update the infiltration study that they had
[1:24:22] performed before um it does show no connection into the sanitary Source
[1:24:27] system um I would like to see an elevation from or one of the elevation
[1:24:33] or views I should say from further up on High Street from the residents up above
[1:24:38] what are they going to be looking at here coming from the other side I mean
[1:24:42] we're doing views from across the road on beakman um looking up beakman but
[1:24:49] nobody's given any thought to anybody on High Street and further up on High
[1:24:54] Street what are these residents that live there now going to be looking at um
[1:25:00] the other thing is with regards to the change in the
[1:25:04] parking code um every eight spaces you're supposed to have a tree within
[1:25:10] the parking space so you're going to have to take a look at maybe modifying
[1:25:14] your parking layout slightly to account for that okay we do have the the
[1:25:20] required amount adjacent to the uh to the parking areas they just
[1:25:24] I I think the intent of the code is really to break it up first before we
[1:25:28] start shifting it and I think it allows the planning board to make that decision
[1:25:34] which way we're going to
[1:25:39] go yeah I can I mean I I remember I brought that up on a different project
[1:25:43] and I believe the the board had allowed it to be perimeter rather than
[1:25:48] necessarily Islands within the um within the lot I do agree that the intent is
[1:25:55] obviously to break up the land the asphalt right that is the intent but I
[1:25:58] think there's prent of the board allowing just take a look at it Justin
[1:26:03] take a look at it and see I mean it would be nice to break up some of these
[1:26:08] large areas with a grass Island um in the tree I understand you know there
[1:26:13] might be constraints some areas due to utilities due to whatever it may be um
[1:26:20] but I think you can break some of it up and at least try
[1:26:32] there that's it okay sorry Rand I I agree with you on as far as for the
[1:26:38] views it would be interesting to see it from a couple different other angles to
[1:26:42] really get an idea of what this really looks
[1:26:45] like it's it would really be interesting anyway me just go around the
[1:26:50] board any oh one thing and Rea if there's any any units on the roofs make
[1:26:57] sure they're in the views yeah that I was just going to ask
[1:27:01] that some some questions every go um I don't have any more comments I think
[1:27:08] that um there was a lot discussed in the ARB
[1:27:12] on Monday so um I feel like I'll yeah this was just an update Reserve until
[1:27:19] next MH yes same yeah I had
[1:27:24] just because we were talking about the landscaping and it has a we hadn't
[1:27:27] talked about it as much in the RB um one thing I'll say about is like park
[1:27:32] benches there's a bench at the um uh Mount Beacon access Park that Scenic HUD
[1:27:39] Hudson did right as you're going up 90 right um and with the light there and
[1:27:45] it's this bench and you're just looking at down the road and all these cars are
[1:27:49] just zooming as fast as they can right up at you it's not very comfortable or
[1:27:54] relaxing place to sit right some people do it for convenience or whatever and
[1:27:57] there's no other place to sit so this is a fairly busy road right so I wouldn't
[1:28:03] put if I was going to put benches in I would try to put them in that little
[1:28:07] landscaped area in between the buildings right off to the side facing each other
[1:28:11] in like a little culde saac that was a little bit more rather than exposed in
[1:28:15] the high you know next to you cars aren't that pretty anymore you don't
[1:28:20] want to just watch Cars you know uh and just think think about that sort of
[1:28:25] aspect of it and I totally agree that like breaking up there's opportunities
[1:28:28] to break up the uh parking and keep it shaded to keep the heat down in the city
[1:28:33] and uh uh the U uh I really want to encourage the
[1:28:40] entrance um uh Landscaping to be part of the
[1:28:45] architecture and it be integrated because right now there's this Tower and
[1:28:49] there's kind of what looks like a um afterthought of great
[1:28:54] and planting and it looks like it's just like a lot of
[1:29:01] um a missed opportunity you might say I'll tell you certainly missed
[1:29:07] opportunity if we can't get it to work but ultimately we are working all those
[1:29:10] into design you've seen it it's evolving those were first renderings these all
[1:29:14] come together we listen to your comments we put it into the lab and it comes back
[1:29:17] out so I I have total faith in your guy's ability to do this and we're going
[1:29:22] to keep an eye on it and uh we expect the best efforts out of you guys because
[1:29:27] it's really
[1:29:29] important stilling like this okay I just two two thoughts right are um bikes bike
[1:29:37] parking bike rack somewhere with because it's it's kind
[1:29:42] of bike racks
[1:29:49] but for the record back of the building but we can work to more more on the
[1:29:53] sides that that and um just for the RB what be also kind of interesting is from
[1:29:58] our standpoint for those members who are on it some even though it's a work in
[1:30:02] progress to kind of get an idea of what you guys are thinking so that we don't
[1:30:06] accidentally become redundant with respect to that even if it's a a simple
[1:30:11] summary of thoughts because that way we're not pling yeah I think we'll try
[1:30:15] and do an ARB meeting before our next submission so that we can try and work
[1:30:18] that that narrative or I know it's it's a mov Target we recorded it and I can
[1:30:24] get a transfer from that and I'll like that would be helpful cuz that way
[1:30:28] we're kind of at the same page and I think said was summarized really the the
[1:30:33] general tone of what we were talking about not everything you don't want to
[1:30:37] recreate the entire conversation we had but I tried to capture the I tried to
[1:30:41] capture the bigger pieces I think um um in there but I think yeah I I'll get to
[1:30:47] it it would just be helpful for us for everyone to keep kind of we're all in
[1:30:51] the same Pace yeah thank you we appreciate and embrace this opportunity
[1:30:55] thank you I appreciate it thank
[1:31:00] you well um s interview is that I'm sorry we need
[1:31:07] to move to adjourn close the meeting just close
[1:31:12] the yeah keep this open I think I'm afraid well motion to uh motion to
[1:31:19] adjourn the meeting second second all in favor I hi hi all right thank you
[1:31:27] everybody for another you are the master of short meetings I don't know you just
[1:31:32] have good