[0:00]
All right, I've got six o'clock. We'll
call the meeting to order. Please call a
[0:04]
roll.
>> Hammer
[0:06]
» here.
>> Hampton
[0:07]
» here.
>> O Kelly here.
[0:08]
» Morman
>> here.
[0:12]
» Here. Angstrom
>> here.
[0:16]
» All right. Number two, approval of
agenda.
[0:18]
» Any changes, your honor?
>> No changes.
[0:20]
» Move to approve.
>> Second.
[0:23]
» Call roll.
>> Henson.
[0:26]
» Yes.
>> Kelly.
[0:27]
» Yes.
>> Mormon.
[0:29]
» Yes. Lson,
>> yes.
[0:30]
» Angstrom,
>> yes.
[0:31]
» Hammer,
>> yes.
[0:34]
» And number three, presentation of
petitions and other communications a
[0:39]
public hearing to review an application
for state revolving funds, SRF loan, and
[0:44]
uh and to make available to the public
the contents of an environmental
[0:50]
informationational or information
document and the city's project plan
[0:54]
water expansion.
Are there any written comments? Yes,
[1:01]
» you'd like to read those.
[1:08]
» There is a total of four questions.
There are some graphs and things on
[1:13]
here, but
you have to bear with us here. A legal
[1:17]
limit versus health limit. The EPA
standards of 10 milligrams per liter was
[1:22]
established in 1962 exclusively to
prevent acute blue baby syndrome in
[1:28]
infants under six months. Extensive
medical research links long-term
[1:33]
drinking water nitrate exposure at
levels as low as 3 to 5 milligrams per
[1:38]
liter to significantly increase risk of
colon cholesterol cancer, thyroid
[1:44]
disease, and birth defects. Why is the
city settling for just staying under the
[1:49]
legal ceiling rather than aiming for a
health protective target below 5
[1:55]
milligrams per liter?
[2:04]
» Go on.
>> That's the question. That's the question
[2:08]
is is why is the city settling for
staying under the legal ceiling rather
[2:13]
than the aiming for health protective
target below 5 milligrams per liter?
[2:18]
Well, currently um the test results have
been coming in around 2 to three
[2:22]
milligrams per liter. So, uh currently
our our nitrate levels are below the
[2:28]
five
>> and and we do shoot for as low as we can
[2:32]
possibly get. It's not like we're just
shooting to stay around eight or nine.
[2:36]
We're shooting for as low as we can get
them. So,
[2:40]
» uh, what target nitrate concentrates in
milligrams per liter will the city
[2:44]
guaranteed at the tap once Daisy is
operational? Will levels be kept
[2:50]
consistently below a safer threshold
like 3 to 5 milligrams per liter or
[2:55]
allowed to float near the legal 10
milligrams per liter limit during peak
[3:01]
spring runoff.
[3:06]
I don't know how we can guarantee that.
>> Yeah, I don't either. Um, you know, all
[3:12]
cities struggle in Iowa struggle with
this. Um, we do our best in blending the
[3:19]
water. Um,
we don't know for sure what Daisy's
[3:23]
going to cause. We are going to put a
new well in uh to help offset the
[3:28]
nitrate levels. Um we expect that they
will stay within the same range that we
[3:33]
have been um seeing. Um we have looked
at alternatives in in treating the water
[3:42]
um if if that is necessary.
[3:47]
» Um
>> we also talked about putting on CIP,
[3:50]
right?
>> Right.
[3:51]
» That nitrate system on CIP. Yep.
>> So and that's coming up shortly. Y uh
[3:59]
many states trigger mandatory
intervention when nitrates reach 3 to 5
[4:05]
milligrams per liter. Given that Boon's
raw raw water regularly pushes 6 to9
[4:10]
milligrams per liter, why is well
blending treated as a permanent strategy
[4:16]
instead of setting a lower finished
water target?
[4:22]
I think if you look across the state of
Iowa, you'll find that most um water
[4:27]
plants are using the blended method um
along with the RO system.
[4:35]
Since Daisy's 1.4 for MGD demand focuses
high nitrate walls to run continuously.
[4:43]
How will the city prevent finished tap
water from spiking higher than it
[4:47]
currently does during peak May through
July runoff events?
[4:57]
I think I think that well number 30 is
is our solution to that. I'm not quite
[5:01]
sure I understand that question
>> and we the city doesn't control runoff
[5:07]
so I yeah I don't
>> that's a tough one so
[5:15]
» um
well uh well second set of questions
[5:20]
well number 30 and the aluvial aquifer
risks
[5:25]
site specific draw down proof aluvial
wells draw directly from riverbank
[5:30]
infiltration.
What hydraological
[5:35]
modeling process modeling proves well
number 30 can pump continuously without
[5:40]
pulling in surrounding high nitrate
groundwater during high flow spring
[5:44]
months.
[5:48]
» Do you want to
>> Yeah. No, no modeling was done
[5:52]
performance. Something we can easily
look into, but that wasn't something we
[5:55]
were contracted to look into. This is
well number 30 is in the area of your
[6:00]
well number 27. It should result in
similar pulling of low nitrate water. If
[6:07]
you would experience high nitrates at
well number 30, I would expect you to
[6:11]
experience high nitrates at well number
27. It's in the same general area which
[6:16]
then with the blending process you're
using gets into
[6:22]
what after the supply and using that
blending. How high are we actually
[6:26]
talking with these numbers for what gets
supplied to the city?
[6:31]
» Public data. Page one of the EID notes.
The city regularly runs seven of its 14
[6:37]
wells. Where can the public access
historical individual nitrate test
[6:42]
results for each specific well rather
rather than just monthly averages of the
[6:47]
combined wells? How high are the nitrate
levels in in the high wells? uh US water
[6:54]
would be able to provide those to you.
[6:58]
Uh page three admits well number 30 is
being dug specifically to provide low
[7:04]
nitrate dil dilution water.
What is the emergency backup plan if
[7:09]
well number 30 own nitrate levels rise
during a high runoff season?
[7:20]
» The blending limit difference. Oh yeah,
>> other wells. That's why we have so many
[7:24]
wells to choose from.
[7:31]
» Go ahead, please.
>> Yeah. So, the it the city's using a
[7:35]
process called blending. And as I
alluded to two questions ago, well
[7:39]
number 27 is roughly in the same area as
well number 30. So if you're
[7:43]
experiencing high nitrates in well
number 30 in the new well we're going to
[7:47]
drill, most likely it's coming in into
well number 27 as higher nitrates as
[7:53]
well. So then it's really becomes a
quantification game of and a semantics
[8:00]
game of how high is high and then can we
still utilize what the cities of what
[8:06]
the city of Boone's current capacity and
blending all of that together to get
[8:10]
underneath what the city standard what
the EPA standard is of that 10
[8:15]
milligrams per liter.
Section three, al alternative
[8:21]
technologies in the Jordan aquifer deep
well limitations. Page three notes that
[8:26]
Jordan oper aquifer wells are ruled out
because preliminary modeling capped
[8:31]
pumping at only 500 gpms per well to
maintain tier one status. Was a combined
[8:38]
approach using a 500 gpm Jordan well
alongside a lupial blending evaluated
[8:44]
for long-term drought and climate
resilience? I'll leave that to you, Eva.
[8:49]
» So that this approach was evaluated at
the high level and what I'll say is the
[8:55]
Jordan well could still be done. It's
just more money, more cost from the
[9:00]
city. We'd have to figure out how to
budget and plan that. Now the regarding
[9:05]
the actual questions of a long-term
clout or long-term drought and climate
[9:10]
resiliency by just by having the Jordan
aquifer, you have to recognize that just
[9:16]
the city of Boone is not pulling from
the Jordan aquifer, but a bunch of other
[9:19]
communities pull from the Jordan
aquifer. And it's not just limited to
[9:24]
the current impact. So, you start
playing the what if game of how many
[9:29]
other communities, how many other new
wells will get drilled into the Jordan
[9:32]
aquifer to pull out the water by that
time you hit the long-term drought. We
[9:38]
can we need to define what the long-term
drought is to actually be able to risk
[9:43]
and assess the resiliency that this
question is trying to get at. But
[9:48]
generally by using the term of a
long-term drought, I would say there's
[9:52]
multiple other reasons or there's
multiple other communities and multiple
[9:56]
other wells pulling from the aquifer
that you'll see that aquafer drop and
[10:02]
all the communities might end up in a
tier one or a tier two or a tier three
[10:06]
status when it's a long-term drought
situation. Were we not denied the Jordan
[10:12]
aquifer by the DNR
>> at the I think you guys wanted to pump
[10:16]
about 750 out of it and it's you're if
you want to go out of the Jordan aquifer
[10:23]
it's that's where this 500 number comes
from is that's the limit you get a you
[10:28]
would pump from it. It doesn't
guarantee. It's not a guarantee though
[10:32]
that you would lose that tier one status
and go into you would lose that status
[10:38]
where it becomes a tier one or a tier
two or tier three which is all
[10:42]
restricting and lessening your water use
and trying to recharge that aquafer
[10:45]
because then that aquifer is overdrawn
or an aquifer is kind of starting to get
[10:49]
to be a sensitive aquifer from all the
other communities that are drawing from
[10:55]
it.
>> Thank you.
[10:58]
Nitrate removal assessment. Page three
explicitly states that as a source water
[11:04]
nitrate increase, a comparative
assessment of constructing an additional
[11:09]
well versus implementing a nitrate
system should be completed. Has the
[11:14]
costbenefit assessment been completed?
If so, where can the public view it?
[11:24]
» So, what I would say is the cost benefit
hasn't been done. What's still needed
[11:28]
for Daisy to come on is the additional
well and additional capacity to pull
[11:33]
water out of the ground for the
treatment and the blending process to
[11:37]
supply it. So, it's it's not one or the
other here of a nitrate treatment system
[11:43]
would work. You still need that well to
pull the quantity of water that's going
[11:47]
to be required.
[11:52]
» Go ahead.
So, why would this project be started if
[11:55]
that assessment hasn't been done yet? Do
you figure out whether that's going to
[11:59]
be viable?
>> We did a water assessment through the
[12:02]
utility committee. Um, and this would
have been four or three years ago when
[12:07]
we did the water assessment and we have
the we have the capacity to supply them
[12:11]
with what's needed. It's just when we
get into these future expansions that
[12:16]
we're doing with the city with all the
housing and stuff like that, it's going
[12:20]
to it changes the assessment a little
bit. So, we're constantly doing these
[12:23]
water assessments, whether it's waste
water or drinking water. We're always
[12:27]
looking forward on that side of things.
[12:33]
» Uh, capital impermit and long-term
financing. Following CIP additions,
[12:38]
following acknowledgement at the August
2026 utility meeting that the nitrate
[12:42]
removal is not in the 5-year capital
improvement plan, at what date will the
[12:47]
nitrate removal system be added to the
CIP and when will it be functional? Uh
[12:52]
we start our CIP process in October. Um
and it the final approval is in March or
[12:59]
April. Um it goes along with our budget
time. uh at that point is when the
[13:05]
nitrate system will get added to the pro
the CIP. Um there still needs to be a
[13:12]
process on the engineer side to design
it, determine what we are needed. Um and
[13:20]
and then also financial analysis to
determine how we'll pay for that.
[13:26]
Um future rateayer burden. Page one
confirms our well-filled firm capacity
[13:32]
5.57 MGDs is technically enough to meet
the 2044 volume depend demands 4.89 MGD
[13:41]
meaning these immediate upgrades are
driven primarily by nitrate blending
[13:45]
from industrial growth. If blending
eventually fails, how will a
[13:50]
multi-million dollar nitrate removal
plant be financed without spiking
[13:55]
residential utility rates?
I don't think we can guarantee that um
[14:00]
your rates won't increase to pay for a
nitrate system. However, um until we get
[14:07]
through all these projects that have to
be done and Daisy gets online, um I
[14:12]
can't guarantee or tell you that that's
how we're going to have to fund it.
[14:20]
» And I think that's all the written
comments.
[14:22]
» Thanks for going through those. Andrea,
are there any other written comments?
[14:26]
Okay. Are there any other public
comments on this subject?
[14:33]
» No. Yes, sir. I set these at two
minutes. Uh,
[14:39]
my name is Elvin Duchess and I'm just a
citizen here in Boom.
[14:44]
I'm no scientist, so I have no idea, you
know, what a nitrate is except what I
[14:50]
read. That's probably not good for me,
but
[14:57]
It seems to me like what we're asking
the city to do
[15:03]
is put a band-aid on an elephant.
You know, anything north of us, runoff,
[15:09]
farm runoff, whatever, it's going to run
into the rivers.
[15:13]
And I think that's where we get some of
our our water. So many people tap into
[15:18]
this aquifier or whatever it is.
I personally feel that until that
[15:25]
elephant encapsulated
by not just the city of Boone, but by
[15:30]
every city around and the state of Iowa
and maybe even every state in the union.
[15:35]
We've got a problem and I don't think
we're going to solve it
[15:41]
by drilling a well or two. We may delay
it, but we're going to have to have help
[15:47]
other than from the city alone. I think
anytime we do a well and increase either
[15:53]
my taxes or my water uh bill or whatever
and I you're we're going to have to
[15:58]
expect that.
I don't know what the answer is. I
[16:03]
appreciate what you're trying to do.
Uh
[16:08]
but but again that elephant is going to
be there until
[16:12]
somebody higher than us
[16:16]
is going to get a handle on this. Thank
you.
[16:19]
» Thank you.
Any other public comments?
[16:27]
» Well, I I would just like to say that we
have a great partnership with US Water.
[16:30]
I said that was part of the reason why
we went on board with them and made them
[16:34]
a partner with us. Um we can we rely on
them to talk to other cities and see how
[16:39]
they're blending, see what they're doing
for nitrate removal systems. We've been
[16:43]
to other cities and seen their nitrate
removal. Not that it's not in our CIP,
[16:47]
but it's in our radar. There's a lot of
things within the city that is on our
[16:51]
radar. It might not be in our CIP at
this time because we're still doing our
[16:55]
due diligence to figure out what the
best process is for us to deal with the
[17:00]
nitrate removal. And we really rely on
US Water for that. And they have
[17:03]
multiple other communities in central
Iowa that they deal with. So, we can we
[17:08]
we piggyback off of them on what they're
doing at these other cities to adjust
[17:11]
their uh nitrate levels as well.
Thanks, Kyle. Any other public comments?
[17:20]
Okay. If there are no other public
comments, we'll declare this public
[17:24]
hearing closed and we will move on to B.
[17:30]
B is the public hearing to review an
application for a state revolving fund
[17:34]
SRF loan and to make available to the
public the contents of environmental
[17:39]
information document and the city's uh
project plan water wastewater expansion.
[17:48]
» Are there any written comments on this
subject?
[17:50]
» No sir.
>> With no written comments, are there any
[17:53]
public comments on that subject?
[17:59]
» Yes. No public comments. We will declare
the public hearing closed.
[18:04]
Move on to C. Public hearing on the
plans, specifications, form of contract,
[18:10]
and estimate of cost for the Hancock
Drive water towers project. Are there
[18:15]
any public or excuse me, written
comments on that subject?
[18:18]
» No, sir.
>> No written comments. Are there any
[18:21]
public comments on this subject?
[18:26]
Okay. No or no public comments. We will
declare that public
[18:31]
and uh we'll move on to C1
3592 resolution
[18:38]
adopting plans, specifications, form of
contract, and estimate of cost for the
[18:42]
Hancock Drive water tower project. And
we need a motion for that.
[18:47]
» So moved.
>> Second.
[18:50]
» Can I ask what the cost estimate for
that is? It's not the packet.
[18:56]
I think it's around 7 and a half
million.
[19:00]
» Okay. So, what we're expecting the bids
to come in at. There was a memo that I
[19:05]
believe I shared with Whan and Andrea
that my intent was shared with you guys
[19:10]
to explain I know the original CIP
budget back two and a half years ago is
[19:15]
like 4.5 million but kind of explains
how that cost has grown since that time
[19:20]
on the CIP which has made
it's almost unbelievable from my
[19:26]
experience on how it how it's gained and
how these costs have grown with
[19:30]
inflation and everything that happened
through that process. And it was when we
[19:34]
helped you develop your CIP at that
time. We had what we thought was a
[19:39]
similar water tower in size
performed in a neighboring community and
[19:44]
it came in at that four and a half
million cost. But then as we work
[19:47]
through the design, the numbers, the
proper sizing,
[19:52]
uh comparing of different types,
different whether different shapes, um
[19:59]
those costs just outer that
>> are all the engineering costs included
[20:04]
in this now.
>> Uh our engineering costs were locked in
[20:08]
our contract we signed before we started
design. So as these what I would say is
[20:13]
as these costs grew from whatever that
initial cost was when he got us under
[20:18]
contract to design it right
>> our fee never grew it
[20:22]
» was locked in so it's just it truly is
just those construction costs.
[20:26]
» Okay.
>> All right. Thank you. We have a first
[20:30]
and a second. Uh please call roll.
>> Kelly.
[20:34]
» Yes.
>> Mormon.
[20:35]
» Yes.
>> Williamson.
[20:37]
» Yes.
>> Angstrom.
[20:38]
» Yes.
>> Hammer.
[20:39]
» Yes.
>> Henson. Yes, sir.
[20:44]
All
>> right, with that, we'll move on to four
[20:46]
reports of standing committees, policy
administration and employee relations
[20:51]
committee Williamson.
>> No report tonight.
[20:54]
» Thank you. Uh B, public safety and
transportation. Hillbec is not here.
[20:59]
Kyle, did you have it?
>> Yeah, we just have one item on here and
[21:02]
it's discuss and approve downtown Boone
gorilla wayfinding signs. Um Holly
[21:08]
Stucker with downtown came to us um
probably a month and a half ago, two
[21:12]
months ago with some signs. Uh we asked
her to get with the businesses of
[21:17]
downtown and get their opinions on the
signs that she was putting up to
[21:22]
represent each business. Um she went
through talked to the 12 businesses. The
[21:27]
12 signs are in the packet. Um
everything looked good in public safety.
[21:31]
We went ahead and or would make the
motion to need a motion to approve it.
[21:35]
So, so MOO,
no cost to the city, by the way. It's
[21:40]
all taken care of by downtown
>> and they're even putting them up.
[21:43]
» Yeah. They're very they're very
temporary. They're more of like a
[21:46]
corrugated plastic. Uh something that
they can change out throughout the
[21:50]
seasons and as you know, businesses
change or they they want to make a
[21:54]
different look. I guess
>> got a motion. Do we have Do we have
[21:59]
» a second?
>> Please call.
[22:02]
» Mormon.
>> Yes. Williamson,
[22:05]
» yes. Angstrom,
>> yes.
[22:07]
» Yes.
>> Hson,
[22:08]
» yes.
>> Ellie,
[22:10]
» yes.
>> Thank you. And utility committee.
[22:14]
» Uh, no report today. We'll just have a
prior meeting on the
[22:18]
21st.
>> Thank you. Uh, D, Economic Development
[22:24]
Committee, Mormon.
>> I have one thing, your honor. Um, Linda
[22:28]
is going to give an update on the arts.
on the arts. Um just wanted to share
[22:36]
that we did conduct a city survey and
trying to get uh some input from uh
[22:44]
citizens just on interest for public art
or public art projects.
[22:49]
Uh our survey uh we did this through the
library. the library helped us and and
[22:54]
we had initially 118 responses
and from that uh I'll just share there
[23:02]
were five questions that we asked
community members. First one, what kind
[23:06]
of impact do you feel public art has on
our city's public areas? We had uh the
[23:12]
two highest responses of highly positive
impact and slightly positive impact were
[23:18]
94% agreed to that. So, a strong uh
support of public art and the impact.
[23:26]
The second, what forms of public art
would you be most excited to see or
[23:31]
encounter around the city? The number
one that was mentioned by 87% of the
[23:37]
people that responded to the survey were
largecale murals. Murals seem to be very
[23:43]
popular in a lot of towns. The second
listed for 78%
[23:50]
selected was functional art which are
like artistic benches, um trash
[23:56]
containers that are painted, those kinds
of things. So, uh objects that are
[24:00]
already in the community.
The next one, where would you most like
[24:05]
to see public art integrated into our
city landscapes?
[24:09]
Number one was in hightra civic areas
near city buildings, downtown district,
[24:16]
main streets. The second uh listed was
in open green spaces like parks, trails,
[24:25]
community gardens. Next question, what
stories, themes or subjects would you
[24:31]
like the artwork to focus on? Number one
selected highest selection was local
[24:38]
history and heritage
celebrating our communities roots and
[24:43]
historical milestones. The second one
listed uh highest was nature, wildlife
[24:50]
and the environment.
Um the last question was what types of
[24:57]
cultural events or arts programming
would you be interested in in attending
[25:02]
in our city? Number one listed uh most
highly listed was artist fairs and
[25:08]
markets.
Um outdoor community art markets,
[25:12]
seasonal vendor fairs. The second live
art performances and festivals,
[25:18]
community theater, live music,
interactive cultural festivals. And of
[25:22]
course, we have some of that going on
already. A couple of the comments um
[25:27]
that I'll share. We also asked to uh
have people leave comments on this and
[25:33]
I'll just give you uh just a sample of
what we heard. Um first, wonderful. You
[25:39]
want to increase art in Boon. Second,
highlight the history of our town.
[25:45]
Public art. I always look for it when I
visit somewhere. More art is a good
[25:51]
thing. I like that one. Of course, uh
community will not support it. It's a
[25:56]
waste of time and money. I travel to see
public art. Thank you for this survey.
[26:04]
So, a lot of different comments on doing
this. I think the next um step for us
[26:11]
will be pulling together um some
community members and talking about what
[26:15]
kind of art project we would like to
pursue and bring back to the the
[26:20]
council.
>> Sound good?
[26:24]
» Thank you.
>> Thanks. That's all I have, your honor.
[26:26]
All right. Thanks, J. Move on to five
public or excuse me, department reports.
[26:32]
Uh Dave A's building official is not
here. B city attorney Ray F. Nothing,
[26:38]
your honor.
>> Yep.
[26:40]
» C. Director of public works, Wayan
Andrews. No report. Your
[26:43]
» honor, I have one real quick question
for you. Um, do you know where we're at
[26:47]
or are we moving along with the
engineering for the first street overlay
[26:52]
and so forth?
>> Yes, we're moving along.
[26:55]
» We're moving along. So, we'll be good.
>> We got Yeah, we got prioritized on that
[26:58]
north transmission bane to make sure
that that one met the timelines it
[27:02]
needed to and then we're
>> back on that one now.
[27:05]
» All right. Thank you. Uh D, Jamie
Williams, library. She is not present.
[27:09]
Uh E, public or park director,
superintendent Mike Cornellis.
[27:13]
» No reporting.
>> F public safety chief Adams.
[27:17]
» No report.
>> Thank you. And fire chief we uh Chief
[27:22]
Weeble Police Chief Weeble, sorry.
>> I got a demotion.
[27:28]
» Oh,
[27:33]
is
wow. He'll now have a comment. I
[27:40]
» G City administrator Andrea Elmquist.
>> Uh yeah. Um we uh took applications for
[27:47]
the finance officer position. Uh we
received six applications. Uh the hiring
[27:53]
committee um
selected three to interview through a
[27:58]
Zoom call that took about 30 minutes
each. Uh they recommended candidate
[28:03]
number three to the city council to move
on to the next level. Uh the next level
[28:09]
would be that you guys can choose to go
ahead and in do an in-person interview
[28:15]
with her or another Zoom interview. Um
she's not local. Um so uh if you would
[28:21]
prefer to do a Zoom interview that would
be fine also
[28:24]
» but in state she
>> she's in state. Yes.
[28:28]
Um or if the alternative um is that you
would like to continue to do a search, I
[28:34]
did reach out to a consulting company um
out of North Dakota uh called Seveny, I
[28:42]
believe is how you pronounce it. Um it'd
be about $18,000 uh for them to do the
[28:47]
search. They are uh just finishing up
Pleasant Hills uh finance officer
[28:52]
search. um they would like 12 weeks just
to collect applications. Um primarily
[29:00]
what they would be doing is making phone
calls um to try and find an applicant or
[29:07]
a candidate that would fit our our
needs.
[29:11]
» 12 weeks
>> 12 weeks just to do the search.
[29:17]
I would like to point out that this is
our busiest time of the year especially
[29:21]
for a finance officer. Uh there are
multiple deadlines that we need to meet.
[29:27]
Um first one being getting caught up on
bank wrecks, doing an audit and then we
[29:32]
have four state financial reports that
are not um one pagers. They are fairly
[29:37]
extensive. Um and then we are also
entering into our capital improvement um
[29:43]
plan uh process and our budgeting
process.
[29:48]
» So is this candidate qualified or no?
>> Um this
[29:53]
» your opinion
>> this candidate I I want to respect the
[29:57]
hiring uh committee and they chose the
best one um out of the applicants that
[30:02]
we received. Uh the applica the
candidate that they are recommending um
[30:08]
is coming from a community that is very
very small. Um
[30:14]
they do not have an accounting degree.
They are working on a master's in
[30:18]
finance. Um
>> when will they finish that?
[30:22]
» I do not know that. She did not put that
on on their application.
[30:28]
Um
it would uh the candidate would
[30:34]
have a big very big learning curve,
>> very big. Uh their current budget that
[30:40]
she's used to is a $1 million budget and
50% of that is a bond payment. So
[30:45]
basically her budget is $500,000 that
she actually has to deal with.
[30:50]
» How many years experience?
>> Four years. She's the only employee for
[30:54]
that city. So, she also is not um very
wellversed in payroll and FLSA.
[31:03]
» I think we need to do a search. I think
that's going to be a waste of time and
[31:07]
money.
>> I agree. After hearing that,
[31:13]
» uh, we need somebody with qualifications
that can at least jump in and start
[31:21]
payroll on day one instead of having a
six-month training period.
[31:27]
» What was the cost again for this search?
>> 18,000.
[31:31]
» So, 18 grand.
>> They do have a one-year guarantee. Uh so
[31:35]
if the person does not work out um
within that first 12 months um they
[31:39]
would uh redo the search. Uh they do
have a periodic check-in with them. Um
[31:46]
they do different types of testing to
make sure that they fit um be a good fit
[31:50]
within our community.
>> I think we I mean we should at least
[31:55]
like interview or entertain and like
look into what the candidate they pick
[31:59]
credentials are. maybe speak with like
the hiring committee before we go out
[32:04]
spending money. But that's just my
opinion.
[32:06]
» We're gonna spend way more than that
because this gal is comes from a
[32:12]
population of 750 people. It's a very
small community. She has very little
[32:18]
experience when it comes to what we're
up against.
[32:23]
you're going to
>> but our search you know we we found that
[32:28]
there are few applicants who are
qualified to do this. So that's the
[32:33]
challenge is even when we try we can't
come up with many to even interview or
[32:39]
consider.
>> That's why it's time the nice thing
[32:41]
about this company is you're going to
get applicants that are qualified.
[32:45]
That's what I'm saying is this this
might be worth it in that they're going
[32:48]
to have a much larger pool to pull from
and will guarantee that they you know
[32:54]
can bring qualified applicants for us.
>> Do they have a good track record for
[32:58]
doing so?
>> Uh they have not done a lot of finance
[33:02]
officer searches in the state of Iowa.
Pleasant Hill is their only one.
[33:06]
» What do they do normally?
>> Um private businesses.
[33:12]
They don't do a lot of government.
Uh they have reached out to over 200 um
[33:18]
potential candidates for Pleasant Hill.
Uh their consistent um response from
[33:24]
individuals is that they don't want to
leave their current cities due to
[33:28]
property tax reform um and the unknowns.
Um, they also made the comment that
[33:34]
they're finding that either the finance
officers are
[33:40]
are seasoned and are closer to
retirement and therefore don't want to
[33:45]
leave and the ones that are ready and
able to leave just don't have the
[33:50]
experience to come to a community our
size.
[33:53]
» And I think we also have to look at
probably what we're offering. I mean, if
[33:58]
this is a very difficult position to to
fill, we're going to have to be
[34:02]
competitive.
>> The salary range is um the same salary
[34:07]
range that Pleasant Hill and Automo was
offering.
[34:12]
» So, we're So, we're in range
>> that we are. Yep. So, we're comparable
[34:15]
to that at the moment.
I will tell you that um one of the
[34:20]
hiring uh committee members um is a
finance officer of a community um here
[34:27]
in Iowa and he was paid more than what
I'm being paid and that's why he did not
[34:32]
apply.
[34:37]
the last officer that we tried to that
we hired, you know, came from a
[34:41]
community bigger than the community that
we're talking about now. And it was a
[34:44]
huge jump for her as well, and it didn't
work out. I I just I'm not saying that
[34:50]
we're going to throw $18,000 out the
window, but at least there's a guarantee
[34:53]
there that we that if if it doesn't work
out, we're not sitting here again.
[34:58]
They're going to be the ones going
through the the process going to school
[35:01]
for finance. And the last chick we
hired, was she going going to get her
[35:06]
masters in finance and anything like
that?
[35:09]
» She was not, but she had 18 years of
experience.
[35:12]
» Smaller.
>> Wasn't going to school for anything
[35:14]
pertaining to finance or anything like
that.
[35:17]
» No. Um,
>> there's a difference.
[35:19]
» You're talking a five, you know,
$500,000 budget compared to a $6 million
[35:23]
budget, you know. So,
>> we have a $27 million budget.
[35:27]
» 27. And and I think the issue is we
don't really have a lot of time for
[35:32]
somebody to get up to speed. We have a
lot of things going on right now.
[35:37]
» So, you know, hiring I mean having
somebody that says, "Yeah, within months
[35:42]
and months they'll come I mean I think
we have to move ahead."
[35:46]
» Agreed.
>> It's pretty complex. So, we need
[35:51]
somebody wellqualified.
>> I I I see it as the cost of doing
[35:54]
business. The only downfall is the 12
weeks that they get for the search time.
[35:59]
And we need somebody like
>> we try to convince them to go a little
[36:03]
quicker.
>> Yeah. See if they can get
[36:05]
» you know, you know,
>> if they're doing it for already some
[36:10]
place,
maybe we can kind of get a similar those
[36:15]
results.
>> I just had the conversation with them
[36:17]
about a week ago and that is what she
she had requested is 12 weeks.
[36:22]
You can see we're kind of looking for
>> right now.
[36:27]
» They did uh mention that some of the
people that they've reached out to were
[36:31]
recently retired and maybe potentially
able to um do a temporary Yeah.
[36:37]
» Yeah.
>> I think we have to look at all options
[36:41]
right now.
>> Doing this for two years. It's it's time
[36:44]
to build
>> get to it. So,
[36:51]
» do you need a motion to go to that or
what do you think on there?
[36:54]
» I will uh reach out to them and I'll
bring back a agreement with on the 21st.
[37:00]
» Sounds good.
>> Anything else, Andre?
[37:03]
» That's all.
>> Okay. Thank you. With that, we'll move
[37:07]
on to the cons consent agenda.
All items listed under the consent
[37:12]
agenda will be enacted by one motion.
There will be no separate discussion of
[37:17]
these items unless unless a request is
made prior to the time of council the
[37:27]
» prior to the time council votes on the
motion.
[37:30]
» So moved.
>> Second.
[37:32]
» Please call.
[37:36]
» Yes.
>> Hammer.
[37:36]
» Yes.
>> Henson.
[37:38]
» Yes.
>> Kelly.
[37:39]
» Yes.
>> Mormon.
[37:40]
» Yes.
[37:44]
» All right. With that, we'll move on to
seven, which is ordinances.
[37:48]
A second reading, ordinance 2330 to
allow the city of Boone, Iowa to change
[37:56]
the
stop intersections in the code of
[38:02]
ordinances action adding section 65.02
subsection 59. The intersection of West
[38:10]
Fifth Street and Jefferson Street is a
stop inter stop intersection for all
[38:17]
northbound and southbound traffic on
Jefferson Street.
[38:21]
» Moved.
>> Second.
[38:25]
» Please call roll.
>> Yes.
[38:27]
» Hammer.
>> Yes.
[38:28]
» Benson,
>> yes.
[38:30]
» Kelly,
>> yes.
[38:31]
» Yes.
>> Yes.
[38:33]
» Hey, mayor. I'd like to make a motion to
wave the third reading on ordinance
[38:36]
2330.
Second,
[38:41]
please call roll.
>> Hammer,
[38:43]
» yes.
>> Henson,
[38:45]
» yes.
>> To Kelly,
[38:46]
» yes.
>> Mormon,
[38:47]
» yes.
>> Williamson,
[38:48]
» yes.
>> Angstrom,
[38:49]
» yes.
[38:52]
» To approve or adopt.
>> Move to adopt. I'm sorry.
[38:55]
» Second.
[38:59]
» Please call RO.
>> Henson,
[39:02]
» yes.
>> Kelly,
[39:03]
» yes.
>> Mormon,
[39:04]
» yes.
>> Lson,
[39:05]
» yes. Thanks Jeffrey.
>> Yes.
[39:10]
» All right. Thank you for that. With
that, we'll move on to B, second
[39:15]
reading, ordinance 2331 to allow the
city of Boone, Iowa to change the
[39:22]
persons with disabilities parking in the
code of ordinance
[39:27]
ren moving section 69.07 07 subsection
4J
[39:33]
7th Street North side first space east
of Keeler Street and adding section
[39:41]
69.07
section 4 FFF
[39:46]
first space east of Boom Street and 7th
Street intersection on the south side.
[39:52]
» So moved.
>> Second. Please call R.
[39:56]
» Kelly.
>> Yes. Mormon.
[39:58]
» Yes.
>> Yes. Angstrom. Yes.
[40:00]
» Hammer.
>> Yes.
[40:01]
» Henson.
>> Yes.
[40:03]
» Mayor, I'd like to make a motion to wave
the third reading of ordinance 2331.
[40:08]
» Second.
>> Who's call?
[40:11]
» Mormon.
>> Yes.
[40:12]
» Williamson,
>> yes.
[40:13]
» Angstrom,
>> yes.
[40:14]
» Hammer,
>> yes.
[40:15]
» Hson,
>> yes.
[40:17]
» Kelly,
>> yes.
[40:19]
» Move to adopt.
>> Second.
[40:22]
» Please call a roll.
>> Lamson,
[40:25]
» yes.
>> Angstrom,
[40:26]
» yes.
>> Hammer,
[40:27]
» yes.
>> Henson,
[40:28]
» yes. vote. Kelly,
>> yes.
[40:30]
» Mormon,
>> yes.
[40:32]
» All right. Thank you. And number eight,
public comments for items not on the
[40:36]
agenda.
If you do have one, please raise your
[40:40]
hand high so I can see you back there.
If you would come up and gate or inside
[40:46]
the gate and please speak loudly.
>> And again, we give two minutes for
[40:50]
public comments.
>> My name is Dana Baker. I live on the
[40:54]
corner of 12th and Benton Street and I
have some concerns about some of the um
[41:00]
activities going on in our neighborhood.
Um
[41:05]
have pictures
on um we have a lot of there's a house
[41:12]
on the corner of between them. Um
there's people there's like seven nine
[41:18]
people living in the house. There's
people living in the trailer. There's
[41:21]
people potentially living in the car.
There is a minor girl that lives there.
[41:25]
Um there's a lot of traffic that come
and goes um all hours of the night. Um
[41:32]
there's a lot of garbage in the yard.
I'm going to say garbage. There's stuff
[41:36]
in the in the yard. And there is a
trailer that is backed up over the
[41:40]
sidewalk with orange over it. I recently
had a fall, so I have to walk with a
[41:46]
walker and I am unable to go around my
block because they have cones. Um, we
[41:52]
have another neighbor here who's also
has to use a walker who can walk a
[41:56]
little further than I can, but she
cannot make it. She can make it around
[42:00]
different blocks. Um, so that's the
first thing. We've had an increase in
[42:05]
rodents, possums, I don't know if it was
a rat, raccoons, snakes. Um, we have
[42:12]
another neighbor that was going to show
up tonight and he was unable to um that
[42:18]
he sent me a text saying what he wanted
me to say. If I can have my husband read
[42:23]
it because I don't have my glasses.
>> Yep.
[42:27]
» Yeah. It just says the abundance of junk
they've strung everywhere is getting
[42:31]
old. I've heard the been mentioned a few
times to get cleaned up and the license
[42:35]
has been taken.
[42:46]
He didn't know if it's illegal or not,
but nothing's happening with property.
[42:51]
» This one's currently on our radar.
>> It's been going I mean, we've complained
[42:56]
over it over the last couple years.
We've had um contact with Ron And I know
[43:01]
he's been working on it. It just seems
like it's getting worse instead of
[43:04]
better. Um, but we're just kind of we're
kind of frustrated. And then to be
[43:09]
honest, we're kind of frustrated with
even the house next to us is that
[43:12]
duplex.
People are coming and going in that is a
[43:16]
is an eyesore. We've done a lot of work
to our property and um needs to get a
[43:22]
little bit. And there's pictures that
are close as well. Um they had reached
[43:28]
out to some other neighbors and a lot of
them were just fearful of retaliation
[43:34]
here that just can't keep living with a
couple years ago. We were pretty sure
[43:38]
there was a drug deal that went down at
the end of our driveway and I am a
[43:42]
medical professional and last thing I
want to do is have to fight for my
[43:45]
license else.
[43:49]
» This one Ron Freyer.
>> Yeah.
[43:52]
» Yeah. We we've uh we have weekly
meetings. Andrea, Ron, and myself. Uh,
[43:56]
and this property has come up a few
times, and we've, uh, I know Ron's
[44:02]
reached out to them and taken different
steps to try to clean up garbage left on
[44:05]
the curbs and stuff like that. Um, we
can maybe talk outside of a public
[44:10]
hearing about the trailer situation. Um,
because you might have some additional
[44:14]
information that would be helpful for us
to address that.
[44:17]
» And then there's just one last thing is
um, there is a house to the east of me
[44:21]
on 12th and and Benton. Um he has a art
um a tree a volunteer tree coming up
[44:30]
right next to the fire hydrant.
>> Is that the one the picture that you
[44:33]
pass around? Yeah. Okay.
>> Pitch on fire and the water couldn't
[44:37]
come on.
>> And then there's also a like an 8 foot
[44:43]
artificial
volunteer tree coming up along the
[44:47]
sidewalk that's probably going to break
the
[44:50]
straight. I I really appreciate you guys
coming up here and bringing it up and
[44:53]
bringing it to our attention.
>> The police department is rather well
[44:56]
aware of this property. And I didn't
know about the trailer blocking the
[45:01]
sidewalk, though. I'll have the office
shut that thing.
[45:06]
» It's a pickup block and sidewalk.
>> It's a pickup. It's a pickup and a
[45:09]
trailer.
>> Yas
[45:18]
driving down the street. You can't see
what's going on because you have two
[45:21]
things blocked.
>> Sure.
[45:24]
» It's just it's getting
[45:30]
» Thank you.
>> Thank you for your time.
[45:31]
» Thank you. Thank you guys.
>> Thank you.
[45:35]
» Motorome somebody you talk to that motor
home to take it out. Now it's back.
[45:45]
» Yeah. I think I think there might be two
different ones. um one was removed at
[45:49]
one point and another one showed. Like I
said, we're trying to deal with the
[45:52]
situation and and any additional
information um is helpful. So,
[45:57]
appreciate it.
>> Thank you guys.
[45:59]
» Thank you.
>> Any other public comments for items not
[46:02]
on the agenda?
[46:06]
» I just have a small wastewater update
for you guys. I was not sure if I can
[46:10]
make it to your next meeting, but just
to give a general update, um I'm your
[46:14]
wastewater engineer. um working with a
whole team of people for your we sweater
[46:20]
treatment plant. Um and I've been
talking with Andrea and Whan and just
[46:25]
want to to update you guys. Um we had I
had come before to do an amendment for
[46:30]
the flows and loads the wasteland
allocation facility plan and all those
[46:35]
things have been completed and we just
received facility plan approval in
[46:39]
August. So we are good to proceed on the
rest of the week.
[46:44]
And so that contract signed a few years
ago. I think
[46:53]
with that and I was waiting to do some
of the last
[47:01]
green light to go ahead. Um, so the next
thing is just for us to finish our work
[47:06]
and then to submit for approval to the
DNR. So I hope to do that and I hope to
[47:11]
do it soon. I'm in the next month or so.
So um the only addition with that it
[47:17]
will be on the next council.
[47:21]
So
in the middle of our design
[47:27]
for Daisy products said they were
increasing our flows by half million
[47:31]
gallons and also reducing their so
taking away carbon from water supply. So
[47:37]
that affected our design. So when I
wrote here report in your facility plant
[47:43]
I accounted for that additional flow in
there. So that's all good with the DN.
[47:47]
Um, I also accounted for addition of a
chemical called microine and that
[47:52]
supplements carbon to your wastewater
system and that's needed to nitrify and
[47:58]
dnitrify and take the nitrates out of
the water before it goes back to the De
[48:03]
Moine River. So, um, so that you can
meet your ethanol needs for that. So, so
[48:08]
everything is included in my design
except for that micro seed edition. So,
[48:13]
it's a chemical addition. Look, there's
a tank that goes with it, a building to
[48:17]
heat it, and then a chemical pump, and
some monitoring for that. So, next week,
[48:22]
that will be on the agenda, but I just
wanted to make you guys aware of what's
[48:27]
you got. Any questions about your waste?
[48:34]
» That is all.
>> All right. Thank you.
[48:37]
Any other one more? Yep.
>> Yeah. Um, all this development felt like
[48:43]
the D uh uh far and daisy building. I'm
concerned because it doesn't work. I
[48:50]
feel doing a job of what's going to
happen with the traffic.
[48:55]
We've got the ledger uh elementary
school out there on industrial park.
[48:59]
You're going to put a bunch more people
going in and out of that daisy and that
[49:03]
complex you can barely see it. Go down
on 30. It's a hill. I think the city
[49:09]
needs to take a little action on finding
some of these subdivisions to make sure
[49:13]
we're covered with the increase in
traffic now and also we don't end up
[49:17]
with nightmare traffic and danger.
>> We we Daisy did do a traffic study um
[49:23]
that has been addressed. So there will
be a right lane um they their policy is
[49:27]
to go right. Uh so there'll be a turning
lane where they go in there'll be a
[49:32]
traffic light they'll go in right
turning right and then they'll leave
[49:35]
turning right.
But I think you need to address the one
[49:40]
on 32 there coming out complex.
[49:47]
» That's DOT.
>> Yeah,
[49:49]
» that's the DOT and they're going to be
doing a roundabout there.
[49:53]
» I don't like roundabouts.
[49:57]
People in more access than
that is a state highway and we don't
[50:04]
have jurisdiction over that.
They need to learn
[50:09]
that
[50:15]
other places. They had round took a long
snow oper.
[50:35]
» Nobody likes them. They're showing up a
lot.
[50:49]
But I am concerned about
[50:56]
going out.
[51:10]
» Well, we appreciate your concern and
your comments. So, thank you very much.
[51:14]
» Any other public comments?
[51:19]
If not, we'll move on to nine, which is
mayor comments. Uh, the only I have is I
[51:23]
want to thank everybody for coming on
Labor Day evening. Um, council members,
[51:28]
public department heads, and obviously
you folks as well. So, but that's all
[51:32]
I've got under my comments. Number 10,
council member comments.
[51:38]
No council member comments. We will
adjourn.
[51:44]
Sorry, we have to go into close session.
So, I need a motion to go into move.
[51:49]
» Second
roll.
[51:53]
» Yes.
[51:58]
» Yes. Hson.