Agenda
Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
[2:10]
Good afternoon. Like to call
[2:12]
AUGUST. 26 Board of Public
[2:13]
Works meeting to order on Todd
[2:15]
Wilson chair the Board blacks
[2:17]
or board members introduce
[2:18]
themselves, Suzy Courtney,
[2:22]
Dan, the Redmond Leslie Schull
[2:24]
t thank you all. And I'd like
[2:26]
to also introduce our board
[2:27]
council behind me Merkel and
[2:29]
our board coordinator Jennifer
[2:31]
Domingues. Our first item on
[2:32]
the agenda today is to adopt
[2:35]
the AUGUST. 26 2026 agenda. Do
[2:38]
I have a motion to its out?
[2:40]
The agenda moved so moved by
[2:43]
pa parent a second. Second of
[2:45]
Redmon all in favor signify by
[2:47]
saying Aye, aye, any oppose
[2:49]
motion carries the next item
[2:51]
on the agenda approval of
[2:52]
minutes to I have a motion to
[2:54]
approve the AUGUST 12, many
[2:55]
minutes so moved by. Susan,
[2:57]
according to have a second
[2:58]
seconded by Leslie Schull to
[3:00]
be on the favor signify by
[3:03]
saying Aye. I any oppose
[3:09]
seeing none that motion Like
[3:12]
to introduce our board member
[3:15]
civic. That was a welcome,
[3:19]
sir. Can go ahead, sir,
[3:24]
because you want to. Next item
[3:26]
on agenda. We have a public
[3:28]
acts or board counsel Benjamin
[3:31]
Moore read the rules governing
[3:33]
public comments. Thank you,
[3:35]
MR. CHAIRMAN, before we open
[3:37]
the Florida public comments,
[3:40]
we liked Herman Board members
[3:42]
and the public a few ground
[3:44]
rules so that everyone can
[3:46]
have fair chance to speak and
[3:48]
be heard and is important each
[3:49]
deserve the following rules.
[3:50]
First, each speaker will be
[3:52]
limited to 2 minutes. Second
[3:54]
public comments for us
[3:55]
recently relate to agenda item
[3:56]
under consideration. 3rd
[3:57]
speakers who stray from the
[3:57]
item under consideration are
[3:59]
becoming to repetitious MAY be
[3:59]
asked to move on to their next
[4:01]
point or conclude their
[4:01]
comments. And finally
[4:03]
attendees to cause disruptions
[4:04]
to prevent the board from
[4:05]
proceeding through today's
[4:06]
agenda reasonably efficient
[4:08]
Lee will be removed. Please
[4:10]
remember that the First
[4:12]
Amendment does not protect
[4:13]
some types of threatening
[4:16]
speech or inciting violence
[4:18]
will deal with those issues as
[4:19]
they arise. But we do not
[4:21]
anticipate that they will.
[4:22]
MISTER CHAIRMAN, if you
[4:24]
entertain a motion to adopt
[4:26]
these rules, we can proceed 2
[4:28]
board members of the motion to
[4:29]
approve the rules as written,
[4:31]
so moved by. And Hank. Got a
[4:32]
go second a second second by
[4:34]
Wagner and officer signify by
[4:35]
saying Aye, aye, any opposed.
[4:37]
Seeing none. The motion so
[4:40]
glass, please. Thank Chair
[4:42]
Wilson, members of the board.
[4:44]
My name is Joe Class and the
[4:45]
executive director and general
[4:46]
counsel of the Indianapolis
[4:47]
Pond Bank. And the hearing is
[4:48]
for a preliminary
[4:49]
determination to issue up to
[4:49]
50 million dollars in a
[4:51]
metropolitan there for
[4:52]
district debt for the
[4:55]
construction of a new
[4:56]
operations garage current site
[5:00]
of to be operations. This was
[5:02]
approved by the evidence and
[5:04]
Finance Committee of the
[5:06]
Council last night unanimously
[5:08]
and will go before the full
[5:10]
council at the next meeting.
[5:12]
We have included materials
[5:14]
with the board a 10 year
[5:15]
projection the maximum changes
[5:18]
to levy and rates. We asked
[5:20]
that be the memo and the test
[5:21]
information be included in the
[5:23]
minutes of the meeting and
[5:24]
then the board will vote. I
[5:26]
declare resolution approve the
[5:30]
issuance of the bonds. And
[5:33]
we'll have one more my public
[5:34]
hearing at Future Board of
[5:35]
Public Works meeting. So happy
[5:40]
to answer any questions. At
[5:41]
this time. I'd like anyone
[5:42]
from the public that would
[5:44]
like to speak regarding
[5:45]
preliminary determination to
[5:52]
issue Bonds. And do I have any
[5:52]
questions from our board
[5:59]
members? Just that the
[6:01]
existing garage really leave
[6:03]
something to be desired. And
[6:07]
so a new garage. Well, and
[6:08]
greatly improve operations
[6:12]
capacity. Is a necessary bond
[6:16]
issuance for that work. Thank
[6:18]
you for the comment. We have
[6:21]
any questions or well as new
[6:22]
safe or was going to be
[6:24]
consolidated. One of the
[6:29]
existing states. So do Sam
[6:31]
bears with to be able to
[6:32]
address the question. Sure.
[6:33]
Hello. Could you please repeat
[6:36]
the question? He was being a
[6:37]
new site or will be
[6:39]
consolidated the existing
[6:40]
site. The garage, the
[6:43]
operations garage. Yeah, so we
[6:45]
are going to have more detail
[6:49]
to share on that project soon.
[6:51]
Our intent is to build that
[6:52]
facility on existing dpw
[6:56]
property. We've talked about
[6:57]
our West Street campus, which
[6:59]
is the main place where
[7:01]
operations is currently
[7:03]
headquarters, headquartered.
[7:05]
We're still working through
[7:07]
some details about that site
[7:09]
to determine whether that
[7:11]
should. Be the final plan. But
[7:12]
yes, our commitment is we're
[7:15]
going to build a new garage.
[7:17]
On dpw property and it's going
[7:19]
to involve consolidation from
[7:21]
other dpw locations. So we're
[7:24]
going to have, you know, folks
[7:26]
that currently report to one
[7:28]
place in the county reporting
[7:30]
to it to a new area and better
[7:31]
work spaces, more space to
[7:33]
store equipment and cannot say
[7:35]
how excited we are all to get
[7:36]
going on this project because
[7:38]
it's something we've been
[7:39]
working towards for a long
[7:42]
time. Thank you, Sam. Do we
[7:44]
have any more questions or
[7:49]
comments? Seeing none to of
[7:50]
motion to approve resolution.
[7:53]
Number 20 to 2026. So moved.
[7:53]
So moved by pa parent of a
[7:56]
second. Second by to shred
[7:59]
none all in favor signify by
[8:02]
saying Aye. I any oppose that
[8:04]
motion carries. Thank you,
[8:05]
everyone. This public hearing
[8:07]
is now closed. Our next item
[8:08]
on the agenda are bit awards.
[8:12]
Jamie call police. The
[8:14]
afternoon Jamie Department.
[8:16]
Public works construction and
[8:18]
then today I have been award.
[8:21]
L d 15, a 0, 3, 6, Eagle Creek
[8:22]
Dam improvements with James
[8:26]
Babcock Incorporated. The
[8:28]
engineering Division staff
[8:30]
recommends the board of Public
[8:32]
works approve and authorize
[8:34]
the director to award Ld 15,
[8:35]
0, 3, 6 Eagle Creek Dam
[8:37]
improvements to James Babcock,
[8:38]
Incorporated in the total not
[8:40]
to exceed amount of $389,600
[8:42]
on the basis that they are the
[8:43]
lowest responsive responsible,
[8:47]
bitter. Project. Ld 15, a 0,
[8:48]
3, 6 Eagle Creek Dam
[8:49]
improvements consist of a one
[8:51]
m. Project to address
[8:54]
deficiencies identified in the
[8:56]
dnr. Biennial Inspection
[8:58]
report. Substantial completion
[9:00]
is scheduled for JULY 6, 2027
[9:01]
with final completion
[9:03]
scheduled for AUGUST. 20th
[9:05]
2027. The engineers estimate
[9:06]
for construction on this
[9:12]
project was 280,000. On JULY.
[9:14]
30th 2026. 2 bids were
[9:15]
received in the low bidder.
[9:17]
Was James Bat Babcock
[9:18]
Incorporated not to exceed
[9:23]
amount of 389,600. Which was
[9:26]
39% higher than the engineers
[9:29]
estimate. They're part 6 mbe
[9:31]
wbe the be the Obi
[9:33]
participation indicates they
[9:34]
made a good faith effort to
[9:37]
meet the owners goals of 15%
[9:39]
in the 8%. 8% wb, 3% b b, one
[9:41]
percent deal be participation
[9:45]
with 40%. For first electric
[9:51]
supply in the e 0%. W v 0.5%
[9:53]
Hoosier hauler incorporated
[9:54]
bbe and 0.5% Hoosier hauler
[9:58]
for paraded deal be. They're
[10:00]
posted. Some Middle sub
[10:02]
contractor and supplier
[10:04]
participation shows how those
[10:05]
goals will be met. The office
[10:07]
Minority and Women Business
[10:09]
Development reviewed James
[10:10]
Babcock, Incorporated some
[10:11]
middle and found they have put
[10:13]
forth a good faith effort.
[10:14]
Happy to answer any questions
[10:16]
you might have. Thank you,
[10:18]
Jamie. Do we have any
[10:19]
questions? Here's one. Concern
[10:21]
both bids are almost 40% or
[10:23]
more higher than estimate. I
[10:28]
do Nick, actually for a
[10:30]
generator replacement so that
[10:32]
that is there's not much
[10:33]
concern. Is just a unique for
[10:35]
this one. Good questions. We
[10:39]
have any other questions.
[10:41]
Seeing none to have a motion
[10:42]
to approve the bid award. So
[10:45]
moved by Dan. Hey, call the
[10:47]
second seconded by subjected
[10:49]
to one's all in favor. Signify
[10:51]
by saying Aye, any opposed
[10:53]
seeing none. The motion
[10:55]
carries. Next item on or and
[10:58]
cold brew least.
[11:12]
Warren Killebrew probably
[11:18]
public Administrator. So just
[11:21]
Haitian forbid, award are the
[11:25]
14 dpw. 1, 7, 6, far supply of
[11:27]
traffic signal components. For
[11:32]
caring table. Control
[11:34]
Corporation. It s plus an rtc
[11:36]
manufacturer recommendations
[11:41]
dpw Recommends the Board of
[11:43]
Public Works approve and
[11:45]
authorize director to award a
[11:46]
two-year term agreement. To
[11:52]
each of carrying Gable.
[11:54]
Traffic control court. It s
[11:59]
plus r to see manufacturing.
[12:01]
For the supply of traffic
[12:04]
signal components on the basis
[12:06]
that each is the lowest,
[12:07]
responsible, responsive,
[12:09]
responsible bidder on certain
[12:11]
line items and r b, 14 dpw, 1,
[12:17]
7, 6, 5, Mike Brown is dpw
[12:19]
traffic manages the city's
[12:21]
traffic signal system. And to
[12:23]
do so. It requires various
[12:25]
cabinet modems controllers,
[12:27]
parts and other components.
[12:29]
Dpw maintains agreements with
[12:31]
the vendors, supply and
[12:33]
delivery of these components.
[12:34]
And to procure these goods to
[12:36]
cities, partisan division
[12:39]
published a request for bids
[12:43]
are me 14 dpw, 1, 7, 6, 5,
[12:46]
which included 252 different
[12:48]
line items splitting to 15
[12:49]
different categories the city
[12:51]
received for bids. To see what
[12:53]
carrying gable traffic control
[12:58]
court. It s and rtc
[13:00]
manufacturing being a Lois, be
[13:01]
it on certain line items
[13:07]
expressed as follows.
[13:09]
Estimated out to $800,000 for
[13:12]
the spin. Thank you. Want have
[13:16]
any questions? Seeing none to
[13:18]
a motion to approve the bid
[13:19]
award. So moved by Idris
[13:23]
Redmond to have a second.
[13:24]
Seconded by subjected to want
[13:25]
to favor signify by saying
[13:27]
Aye, any opposed motion
[13:30]
carries. Agenda are change
[13:39]
orders. Yes, this is a change
[13:41]
order. Number 2, final and
[13:44]
final acceptance for br 16, 0,
[13:45]
7, for a Lafayette road over a
[13:49]
Little Eagle Creek with Beatty
[13:50]
Construction Incorporated,
[13:51]
engineering Division staff
[13:53]
recommends the Board of Public
[13:55]
works approve and authorize
[13:56]
the director to execute
[13:57]
change. Order. Number 2, final
[13:58]
and final acceptance to be our
[14:00]
16, a 0, 7, for a Lafayette
[14:01]
road over Little Eagle Creek
[14:03]
with Beatty Construction
[14:05]
Incorporated in a decreased
[14:09]
amount of $46,752.50 where a
[14:11]
new contract amount of
[14:14]
1 million, 627,000 $8.82 and 0
[14:15]
day subtracted from
[14:17]
substantial and final
[14:18]
completion dates change. Order
[14:20]
number 2, final and final
[14:22]
acceptance will provide
[14:23]
conversation and Kwame
[14:24]
adjustments for change order.
[14:27]
The tail 2.1 which is
[14:28]
summarized below this final
[14:31]
quite sure up for the project
[14:33]
contract change. Order number
[14:34]
2, final final acceptance
[14:36]
accounts for 0 days,
[14:37]
subtracted from substantial
[14:38]
final completion date. So we
[14:40]
have answer questions. Thank
[14:41]
you. Do we have any questions
[14:45]
on this change order? Seeing
[14:46]
none too out of the motion to
[14:47]
approve the change order. And
[14:48]
finally acceptance move, so
[14:49]
moved by by a parent or
[14:52]
second. Seconded by take on
[14:53]
the favor signify by saying
[14:55]
Aye, aye, any opposed seeing
[14:57]
none. The motion carries next.
[15:02]
Change order, please. Jamie.
[15:07]
Change order. Number 2, final
[15:08]
as the 39, 0, 6, 2, Rosedale
[15:09]
Hills drainage improvements
[15:10]
county with Calumet Civil
[15:14]
Contractors Incorporated. The
[15:15]
engineering Division staff
[15:16]
recommends the Board of Public
[15:18]
works approve authorize the
[15:19]
director to execute change.
[15:20]
Order. Number 2, final 2 St.
[15:22]
39, 0, 6, 2, Death Row's deal
[15:24]
hills, drainage improvements
[15:26]
with Calumet Civil Contractors
[15:28]
incorporated in a decrease the
[15:32]
amount of $126,180. And $0.37
[15:34]
for a new total not to exceed
[15:38]
contract amount of 4 million,
[15:40]
391,560 $5.16 and 0 days added
[15:41]
to the substantial and final
[15:45]
completion dates. Change.
[15:45]
Order number 2, final will
[15:48]
provide one of the true up for
[15:48]
change order or sealed. The
[15:49]
number 2.1 which is summarized
[15:53]
below. Change. Order number 2,
[15:55]
final accounts for 0 days
[15:56]
added substantial final
[15:57]
mission dates. We have answer
[16:01]
any questions. And questions.
[16:02]
Seeing none to a motion to
[16:03]
approve the final change
[16:05]
order. So moved by Hague of a
[16:10]
second. Seconded by to
[16:11]
strengthen all in favor
[16:14]
signify by saying Aye, aye,
[16:15]
any oppose, seeing none. That
[16:19]
motion carries next. One
[16:20]
change. Order number one,
[16:23]
final for t s 25 0, 1, 9,
[16:25]
video detection at crashed
[16:29]
into intersections. Tc with tc
[16:31]
Electric Incorporated. The
[16:32]
engineering Division staff
[16:33]
recommends the Board of Public
[16:35]
works approved, offer eyes the
[16:37]
director execute change. Order
[16:40]
number one, final tts. 25 0,
[16:42]
1, 9, video crashed into
[16:44]
intersections with tc Electric
[16:45]
Incorporated in the increased
[16:48]
amount of 3,000. Her $7 and
[16:49]
$0.32 for a new total not to
[16:51]
exceed contract amount of
[16:55]
661,000 907 dollars. And $0.32
[16:57]
to include 10 days added to
[16:58]
the substantial and final
[17:01]
completion dates change. Order
[17:02]
number one, final will provide
[17:03]
time and funds for the change
[17:05]
order detail. 1.1, 1.2 1.3
[17:08]
with your summer as well.
[17:09]
Change order number one, final
[17:12]
counts for 10 days at a
[17:13]
substantial final completion
[17:14]
dates. Happy to answer any
[17:14]
questions you might have.
[17:19]
Thank you, Jimmy questions.
[17:20]
Yeah, I guess my question is
[17:23]
my understanding is we can't
[17:24]
have cameras in the roadway.
[17:29]
How do we get around this for
[17:30]
crash detection videos. These
[17:31]
these these cameras are
[17:34]
mounted up on on the polls at
[17:35]
the intersections that they
[17:40]
kind you over the top of it.
[17:41]
Yeah, I would just add to that
[17:44]
state law prohibits video
[17:45]
enforcement for a light red
[17:47]
light running. You can't issue
[17:48]
a ticket based on red lights.
[17:48]
These are not for video
[17:50]
enforcement. These help
[17:51]
control the flow of traffic at
[17:53]
the intersection and then they
[17:55]
also allow us the capability
[17:56]
to collect data on traffic,
[17:57]
light traffic counts and near
[17:58]
ms analysis. We'd like to do
[18:02]
something like that as well.
[18:02]
The question we have any other
[18:06]
questions. Seeing none. 2 of
[18:07]
the motion to approve the
[18:10]
final change order. So moved
[18:10]
by. Susan, according to
[18:14]
second. Seconded by subjected
[18:14]
to wants all in favor signify
[18:19]
by saying aye. Seeing that
[18:21]
motion carries our next item
[18:23]
on the agenda are professional
[18:23]
services agreements. Jamie
[18:28]
still up. This is professional
[18:29]
service agreement for
[18:32]
inspection for e and g 26, 0,
[18:33]
0, 1, on call storm water
[18:34]
inspection services with the
[18:37]
etiquette group incorporated.
[18:38]
The engineering Division staff
[18:41]
recommends the board of Public
[18:41]
works approve authorize the
[18:43]
director to execute in g 26,
[18:45]
0, 0, one on call storm water
[18:47]
inspection services. A new
[18:48]
professional service agreement
[18:49]
with the Antique, a group
[18:51]
incorporated and then not to
[18:51]
exceed total agreement amount
[18:55]
of $500,000 with an agreement
[18:55]
expiration date of DECEMBER
[19:02]
31st. 2028. He indeed. 26 0,
[19:03]
0, one on call stormwater
[19:04]
inspection services is for on
[19:04]
call. Storm water inspection
[19:08]
services. Could group
[19:12]
incorporated in be e w d o b.
[19:14]
The participation will include
[19:16]
infrastructure, engineering.
[19:19]
Indiana Lcmv Powers,
[19:20]
Engineering, incorporated, wbe
[19:21]
veterans, Engineering and
[19:22]
Technical Services, llc for
[19:25]
Bbe. The ndp group
[19:26]
Incorporated was selected
[19:27]
through Rfq Twenty-twenty 6
[19:28]
Dash 2. Happy to answer
[19:30]
questions. You might have.
[19:34]
Thank you. Any questions.
[19:34]
Seeing none. Motion to approve
[19:37]
the agreement. With so moved
[19:40]
by about of a second second by
[19:40]
letting Shealtiel favor
[19:42]
signify by saying Aye. I and
[19:45]
impose. Seeing none. The
[19:48]
motion carries Jamie Please.
[19:49]
Yes, this person that's real
[19:52]
service agreement for
[19:55]
inspection g 26, 0, 0, 2, on
[19:55]
call Storm Water Inspection
[19:56]
services, Firstgroup
[19:59]
Engineering incorporated. The
[20:00]
engineering Division staff
[20:03]
recommends the board of Public
[20:04]
works approve and authorize
[20:05]
the director to execute png.
[20:06]
26 0, 0, 2 on call stormwater
[20:08]
Inspection Services. A new
[20:09]
professional service agreement
[20:11]
with Firstgroup Engineering
[20:12]
incorporated in the not to
[20:13]
exceed total agreement amount
[20:16]
of $500,000 with an agreement
[20:17]
expiration date of DECEMBER
[20:23]
31st. 2028. Project g 26, 0,
[20:24]
0, 2, on call storm water
[20:24]
inspection services for on
[20:25]
call stormwater inspection
[20:29]
services. Firstgroup
[20:31]
Engineering incorporated mbe
[20:33]
Wbe in the participants will
[20:36]
include 10% to 70 engineering
[20:38]
in b 10% to value. Plus,
[20:40]
engineering services in the
[20:42]
and 7% to vets engineering and
[20:45]
technical Services v
[20:45]
firstgroup engineer
[20:46]
incorporates like into Rfq
[20:48]
Twenty-twenty 6 dash 2. Happy
[20:49]
answer any questions you might
[20:53]
have. Any questions. Seeing. A
[20:53]
motion to approve the
[20:56]
agreement. So moved by
[21:00]
increase revenue of a second
[21:00]
second second they can to want
[21:01]
on favor signify by saying
[21:04]
Aye. I any opposed. Seeing
[21:08]
none. The motion carries. Next
[21:10]
Jamie, please. Yes, this is a
[21:13]
professional service agreement
[21:16]
for inspection. The Indy. 26
[21:17]
0, 0, 2, near East side
[21:18]
streetscape tent in rule with
[21:21]
Mueller group incorporated.
[21:22]
The engineering Division staff
[21:25]
recommends the board of Public
[21:26]
works approved and authorized
[21:27]
director to execute de. 26 0,
[21:28]
0, 2, near East Side street
[21:32]
skate 10th and rule a new
[21:33]
professional service agreement
[21:35]
and inspection with Lock
[21:35]
Mueller group Incorporated to
[21:37]
not to exceed total agreement
[21:40]
amount of 1 million, 679,500
[21:42]
dollars with an agreement
[21:42]
expiration date of DECEMBER
[21:47]
31st. 2028. Project ev. 26 0,
[21:49]
0, 2, near East side
[21:50]
streetscape 10th and will
[21:50]
include streetscape
[21:52]
intersection, safety
[21:53]
improvements and placemaking
[21:54]
efforts along 10th Street from
[21:57]
Tecumseh Street to rule street
[21:58]
a long rule street from 10th
[22:00]
Street to Saint Clair Street.
[22:03]
This includes the addition of
[22:03]
a multi-use path, improve
[22:05]
sidewalks and ada ramps,
[22:07]
stormwater management lighting
[22:08]
and intersection realignment
[22:10]
attempt in rule the
[22:12]
substantial completion date is
[22:13]
DECEMBER 31st. 2027 and the
[22:15]
final completion date. Is
[22:17]
FEBRUARY 14th, 2028 Lock.
[22:22]
Mueller Group Incorporated.
[22:24]
Mbe Wbe Vb Ian Deal be
[22:25]
participation will include 15%
[22:28]
to Jake. You'll allow in the
[22:30]
8% a resolution group
[22:32]
incorporated wbe 3% to
[22:33]
veterans Engineering and
[22:36]
Technical Services, llc, d b
[22:37]
and one percent to project
[22:40]
photo Docks llc. Deal be
[22:41]
popular group was incorporated
[22:44]
was selected through Rq 2023.
[22:45]
Dash 2. I'm happy answer
[22:50]
questions. You might have. So
[22:52]
that area on 10th Street has
[22:54]
some pretty low pedestrian
[22:58]
Whiting. Is lighting to
[22:59]
replace pat or is it street
[23:01]
lighting? To some of the mark?
[23:07]
If you have any input on that?
[23:09]
Here is there's pedestrian
[23:11]
specifics lighting. Is that
[23:12]
what you're asking? What you
[23:13]
extreme level Whiting like?
[23:14]
What's lighting component of
[23:16]
this project believe would be
[23:17]
additional street lighting.
[23:21]
Some more street Any other
[23:24]
questions? Seeing none to a
[23:25]
motion to approve the
[23:28]
agreement. So moved by
[23:29]
subjected to want to do a
[23:32]
second. Second of it Treyvon
[23:34]
all in favor signify by saying
[23:36]
Aye, any opposed seeing none.
[23:39]
The motion carries. Thank you,
[23:41]
Jamie. Next item marks in
[23:43]
town. Please, thank you. The
[23:44]
first item I have before you
[23:45]
is a professional services
[23:48]
agreement design on gt Dash 2,
[23:51]
4 dash. '05, which is rss for
[23:54]
a group to project with the
[23:55]
mcs Incorporated, the
[23:56]
engineering Division staff
[23:58]
recommends the Board of Public
[23:59]
works proven authorize the
[23:59]
director to execute gt Dash 2,
[24:03]
4, Dash, 0, 0, 5, es s for a
[24:05]
group to scoping a new
[24:05]
professional services
[24:07]
agreement for design with the
[24:08]
mcs Incorporated and the not
[24:14]
to exceed total out of
[24:14]
3 million, 923,665 dollars
[24:16]
with an agreement expiration
[24:20]
date of DECEMBER 31st. 2031
[24:23]
Project gt Dash 2, 4 Dash 0, 5
[24:24]
is for Safe Streets Project
[24:25]
and that includes the
[24:28]
following road segments Post
[24:30]
Road 30th Street Lyndhurst
[24:31]
Drive 42nd Street Franklin
[24:34]
Road and Thompson Road gt Dash
[24:35]
2, 4 Dash 0, 4 was the
[24:37]
companion scoping projects a
[24:38]
little bit more detail on this
[24:43]
project. The project includes
[24:45]
well, the project has applied
[24:48]
for to us, dot included the
[24:50]
improvement or construction of
[24:51]
approximately 11 miles of
[24:54]
sidewalk. 538 curb ramps. 71
[24:55]
bus boarding areas and the
[24:59]
installation of a team that
[25:01]
blocked crossings. There is
[25:02]
20 million dollars just under
[25:03]
20 million dollars in federal
[25:05]
money associated with this
[25:07]
project and all those road
[25:07]
segments are on our high
[25:14]
injury network. Emc s
[25:15]
incorporate incorporated, mbe
[25:17]
wbe bbe dot e participation
[25:19]
will include 21 point to 6% vs
[25:21]
engineering. 6.1 2% to
[25:23]
infrastructure. Engineering of
[25:26]
Indiana. 0.68% to Compass
[25:27]
outreach solutions, 0% bbe and
[25:31]
0% de o p e the mcs was
[25:33]
selected through Rfq 2023 dash
[25:34]
2. Happy to answer any
[25:36]
additional questions on this.
[25:37]
Thank you, Mark. Do we have
[25:42]
any questions? Seeing none.
[25:43]
Motion to approve the
[25:45]
agreement. So moved by. Susan
[25:49]
Courtney got a second.
[25:50]
Seconded by Dan. Hey, all in
[25:52]
favor signify by saying Aye. I
[25:54]
and post seeing none that
[25:58]
motion carries. Next item on
[25:59]
our agenda, professional
[26:00]
services amendments. And Mark,
[26:03]
you have this Thank Next item
[26:04]
I have is amendment number one
[26:08]
to br Dash '04 Dash '02 monon
[26:10]
trail over 86 Street with Ch a
[26:12]
consulting incorporated. The
[26:14]
engineering Division staff
[26:14]
recommends the Board of Public
[26:15]
works approve and authorize
[26:16]
the director to execute
[26:17]
Amendment one to br Dash '04
[26:21]
Dash '02 on on trail over 86
[26:22]
Street. A professional
[26:23]
services agreement for design
[26:25]
with Ch a consulting
[26:27]
incorporated and the increased
[26:29]
amount of $7,199 for a new
[26:34]
total agreement. Amount of
[26:35]
1 million, 116,499 dollars.
[26:36]
Additional scope of services
[26:37]
and updated consultant rates
[26:39]
included this agreement.
[26:40]
Expiration date will remain
[26:43]
DECEMBER 31st. 2030, project.
[26:44]
We are dash '04 Dash '02 is
[26:46]
for the design of a structure
[26:48]
to carry the monon trail over
[26:49]
86 Street Amendment one
[26:50]
provides funding for the sub
[26:51]
consultant NorthPoint to
[26:53]
perform a full new topic.
[26:54]
Graphic survey of the project
[26:57]
site rather than use prior
[26:58]
survey information taken from
[27:00]
another project. The amendment
[27:01]
also provides updated rates
[27:03]
for the wine trout inland
[27:04]
story, sub consultants and an
[27:06]
why for wine trout. Happy to
[27:06]
answer any questions you MAY
[27:08]
have. Thank you, Mark, we have
[27:15]
question. Is so that's where
[27:17]
really into the preliminary
[27:17]
design work with this
[27:22]
contract. We'll see a j also
[27:24]
be bridge architect towards
[27:27]
that cause it to be handled.
[27:30]
No. There is a separate bridge
[27:32]
park attacked associated with
[27:34]
this project and see aj is
[27:34]
here and they can serve more
[27:35]
specific questions about that.
[27:39]
If you would like you just one
[27:41]
with that, our kids expect to
[27:41]
get involved concept present
[27:50]
to the community. Thank you,
[27:55]
Charlie. Charlie Starling with
[27:58]
Chi Consulting the. Is the
[28:00]
architect is currently
[28:01]
developing. Renderings is
[28:02]
going to under scope to
[28:04]
develop 3 concepts. They'll be
[28:06]
presented to the dpw staff in
[28:08]
OCTOBER and then expect to be
[28:09]
presented to public in
[28:13]
DECEMBER. And the architects
[28:17]
name is real solace. Thank
[28:17]
you, Charlie. Are there any
[28:21]
other questions? Seeing? None.
[28:22]
2 of the motion to approve the
[28:26]
amendment. So moved by the of
[28:28]
a second second by about
[28:29]
parent all in favor signify by
[28:33]
saying aye, any opposed.
[28:34]
Motion carries. All right.
[28:36]
Next item on our agenda is a
[28:37]
presentation were on Our
[28:41]
financial team too, give the
[28:42]
2020's 7 budget presentation
[28:46]
that we gave too. Council
[28:46]
committee on AUGUST 13th. This
[28:49]
is a preventive Reavie, a
[28:53]
diversion of But without
[28:55]
further ado acts, Margaret
[28:55]
Wilson, too, give the
[28:59]
presentation. Thank you. And
[28:59]
we also have sights on the
[29:05]
screen as well. Yes, hi, good
[29:06]
afternoon, everybody. Director
[29:07]
Wilson, thank you. You still
[29:10]
most of my little intro here
[29:12]
for our abridged version of
[29:14]
the 2027 budget presentation
[29:17]
that we gave about 2 weeks
[29:20]
ago. So we cut this down just
[29:21]
2 about the meat and potatoes
[29:24]
of it. So we will be happy to
[29:26]
go into any other questions.
[29:28]
Further details on anything
[29:31]
that you MAY have at the end.
[29:32]
But otherwise, these kind of
[29:33]
the key points we'd like to
[29:40]
highlight 4 the board today.
[29:43]
I'll start off with our agency
[29:45]
staffing. This has been
[29:46]
extreme when for the
[29:48]
department this year you'll
[29:52]
see are filled positions are
[29:57]
at 91.1% And this this as of
[29:58]
AUGUST 4th, when we have this
[30:00]
data for the budget
[30:02]
presentation, this number is
[30:05]
up from 88.6 last year when we
[30:06]
present and for the same
[30:11]
budget presentation. At this
[30:13]
time. We do have all of our
[30:15]
engineering admin positions
[30:16]
filled as well. So that's been
[30:21]
a success for that division.
[30:23]
And I would like to give kudos
[30:25]
to our internal internal Peril
[30:29]
and h r for helping to
[30:31]
streamline the process the
[30:36]
past year or so. We've worked
[30:38]
well together with our new
[30:38]
hires to shorten the amount of
[30:42]
time. And and the back and
[30:45]
forth with the application
[30:46]
process. And I think that is
[30:49]
very important to highlight.
[30:51]
They are kind of that first
[30:53]
face of this city for our new
[30:56]
employees. So having a great
[30:57]
peril team involved in helping
[30:58]
them get started been very
[31:03]
beneficial. Next year. We will
[31:05]
be also implementing the step
[31:09]
in new policy. There's still
[31:10]
some details to be sorted out
[31:12]
with that, that we will share
[31:15]
once that's available. But
[31:18]
that will be an effort to help
[31:22]
biweekly employee retention
[31:24]
let them know that they're
[31:25]
valued not wait to be on the
[31:26]
cola increase that we Spain
[31:32]
every year. Here. We've got
[31:35]
the graph of the filled
[31:38]
positions. This goes back the
[31:45]
past year. And you can see.
[31:49]
You can see we're at 739
[31:51]
positions filled at that 91%
[31:56]
rate as of the end of JULY.
[31:57]
You'll see the increases as
[31:58]
well since the cba took into
[32:02]
effect in 2025. And then just
[32:06]
noting percentage of our union
[32:12]
positions is about 75%.
[32:15]
Getting into the dpw operating
[32:21]
budget dpw. Its is built
[32:25]
around some major revenue
[32:26]
sources. That's primarily
[32:27]
divided up into these
[32:30]
categories here on the screen,
[32:32]
we've got the mv Hrs will tax
[32:34]
storm water user fee, solid
[32:38]
waste user fee and special
[32:40]
service just district tax
[32:44]
Levy, we. It can account for
[32:50]
some of stable increases. And
[32:52]
plan for those along the way.
[32:53]
So you can see we've got a
[32:55]
budget growing about of about
[33:01]
10 million this year. We also
[33:04]
can seek supplemental budget
[33:05]
and some of it, which will be
[33:08]
explained. The further slides.
[33:10]
But we have things like the
[33:11]
inner local agreement grants
[33:13]
and one-time appropriations.
[33:19]
That factor into our revenue.
[33:21]
Big point here on this budget
[33:27]
slide. You'll notice our total
[33:30]
2027 introduced budget is at
[33:32]
335 million dollars. That's
[33:33]
substantial increase about
[33:35]
77 million from last year. So
[33:36]
we're very excited to put that
[33:44]
to work. We have the top line
[33:45]
of this graph. Kinda refers
[33:46]
back to that previous slide of
[33:49]
those dpw operating funds. And
[33:52]
then we also get into our
[33:55]
fleet Services fleet Services,
[33:57]
are funded, mostly by charge
[33:58]
backs. And that's from the
[33:59]
other divisions and
[34:03]
departments. They're getting
[34:05]
an increase this year of about
[34:07]
1.4 million. And that driven
[34:12]
largely by the cola increases
[34:14]
lower vacancy rates and
[34:16]
contractual increases. Our
[34:19]
capital funds are used for the
[34:24]
infrastructure and our capital
[34:25]
in a five-year capital plan
[34:26]
again, we'll get into some
[34:28]
more of those details. Next
[34:33]
slides. Grant funds. We
[34:34]
sometimes have some challenges
[34:36]
to budget those exactly. Those
[34:41]
numbers are based on what we
[34:43]
are But usually within the
[34:46]
mpo. But final number will be
[34:49]
determined by the results.
[34:50]
Usually a percentage of fat
[34:53]
like 80 20 split. So we budget
[34:54]
these as best we can based on
[34:57]
those big dates and
[35:05]
anticipated that results. The
[35:06]
slide will be a budget
[35:08]
breakdown by character. We
[35:10]
have character one through 5.
[35:13]
And if you're not familiar
[35:16]
character one, as for our
[35:18]
personnel cost. That's the
[35:20]
labor and the wages that we
[35:22]
pay all a far employees,
[35:23]
whether by weekly or union and
[35:25]
also health care is included
[35:29]
in that as well. Character to
[35:33]
supplies character, 3 services
[35:35]
character for of Capital and
[35:39]
character. 5 charge backs.
[35:40]
You'll see the biggest
[35:41]
increases this year will be
[35:43]
within the character for
[35:46]
capital for about 71 million
[35:49]
and character. One person now
[35:50]
we've got an increase of about
[35:57]
2.8 million there. Getting
[35:59]
into our engineering division.
[36:01]
That's one of the 5 divisions
[36:08]
within dpw. The primary
[36:11]
increase obviously and capital
[36:15]
character for and that that's
[36:16]
largely where doing on the
[36:17]
road and bridge projects that
[36:21]
you you for the board getting
[36:22]
presented for the bet Awards
[36:27]
and everything. On the right.
[36:31]
We have a chart based on the
[36:34]
program breakdown. This was a
[36:36]
new process last year that we
[36:38]
introduced of breaking down
[36:39]
the budget within the programs
[36:42]
we think of these kind of what
[36:44]
are we offering the city? What
[36:46]
is it? We're doing that then
[36:49]
they can c and name this is
[36:53]
what programs the department
[36:55]
is offering. So the largest
[36:56]
bucket. There's our
[36:58]
transportation capital. When
[37:00]
we get into the top line there
[37:02]
of administrative that would
[37:04]
include overhead costs,
[37:07]
personnel, that character one
[37:08]
technology vehicles, things
[37:10]
like that.
[37:16]
I'm sorry. What is not
[37:19]
captured in the budget package
[37:22]
is the 10 million
[37:24]
appropriation of 2026
[37:26]
supplemental covid this
[37:29]
funding will be used to comply
[37:33]
with sca 1, 7, 9, the matching
[37:36]
requirement for 2027. This
[37:37]
money will be used for the
[37:39]
street rehabilitation projects
[37:42]
and those are targeted too.
[37:44]
Start construction. Early
[37:46]
2027. Have more information on
[37:50]
this within the Capitol plan.
[37:55]
Slides in the next few slides.
[37:59]
Getting into operations.
[38:01]
Again, largely the increase
[38:02]
here we'll see is character
[38:08]
one person now including the
[38:10]
3% cola biweekly. I'm sorry,
[38:11]
biweekly Paula. Then cba
[38:15]
increase for the Union. We
[38:16]
also have some increased and
[38:24]
our contractual. Character 3.
[38:24]
The budgets. When we talk
[38:28]
about character too, for
[38:29]
operations, that's where we
[38:31]
have most of our money for
[38:32]
character, too. And that's
[38:33]
going to be all of the
[38:35]
procurement of salt asked fall
[38:39]
the traffic signal components,
[38:42]
hardware, signs, pain,
[38:43]
everything that keeps our
[38:51]
crews move in every day. Like
[38:55]
to highlight. We had the
[38:57]
motion approved earlier this
[39:00]
meeting for the geo Bond to
[39:03]
provide the 15 million in
[39:07]
capital funding for a new
[39:08]
operations facility. As
[39:09]
mentioned. This is very
[39:10]
exciting. It's been decades in
[39:16]
the works this will involve
[39:17]
consolidating some of the
[39:23]
garages and providing much
[39:24]
much needed upgrades to our
[39:27]
our facilities for workers.
[39:28]
Key point I'd like to mention,
[39:31]
too, is the improved storage
[39:33]
capability that will have for
[39:34]
all of the equipment that we
[39:37]
have been investing in. So
[39:40]
that when we get good, solid
[39:42]
garage up and running, that
[39:44]
can be the safe haven for all
[39:45]
of the equipment that we've
[39:48]
been purchasing.
[39:53]
Getting into solid waste
[39:55]
division, shout out to their
[39:57]
crews as well for all the work
[39:58]
they've been doing with this
[40:00]
flood response lately. And
[40:04]
they've been out helping to
[40:06]
get the debris and trash not
[40:09]
only picked up that sordid
[40:10]
appropriately and disposed of
[40:13]
appropriately as well. We'll
[40:15]
see most of their increase
[40:18]
just in character. One, the
[40:23]
character, 3 services. That is
[40:25]
the bulk of what have their
[40:28]
budget with them. And this
[40:30]
would be for all of the holler
[40:31]
contracts that we have
[40:34]
residential waste collection
[40:36]
And also thank you to our
[40:37]
partners, the our contractual
[40:41]
partners with the flood
[40:42]
response that they've helped
[40:49]
us along with. All see and
[40:50]
planning largest increase
[40:55]
here. Personnel. We have Let's
[40:59]
policy and planning houses the
[41:03]
office of Sustainability, the
[41:04]
environmental group that does
[41:06]
talks drop. We will be adding
[41:09]
a new location next year and
[41:13]
they have since also added
[41:15]
additional days that the Perry
[41:23]
location. We. You'll see most
[41:24]
of the budget sits within
[41:28]
central administrative and
[41:29]
it's that kind of hard to call
[41:33]
out the programs here with
[41:34]
division because they wear
[41:37]
many hats and kind of more
[41:38]
behind the scenes with
[41:40]
everything that we're doing
[41:41]
you know, personally finance
[41:43]
where in policy and planning
[41:47]
so give do is to my team. I
[41:48]
looked at the numbers last
[41:51]
night and we have processed
[41:53]
over 300 contracts each year.
[41:57]
Since 2022. And so that is a
[42:00]
result of everything that you
[42:04]
all during our board meetings
[42:07]
and beyond. And that that back
[42:08]
end of keeping those moving
[42:11]
through process that, you
[42:13]
know, helps get the job
[42:14]
started sooner. Contractors
[42:16]
paid sooner. Jobs finished
[42:22]
dinner. And then last but not
[42:27]
least we have fleet. There
[42:28]
increases with most of the
[42:31]
others, we have character one
[42:33]
increases for personnel and
[42:37]
character. 3 for services.
[42:41]
We've previously for
[42:43]
additional appropriations
[42:45]
within specifically character
[42:46]
3 in previous years to help
[42:51]
with the cost of maintaining
[42:52]
and fixing some of our
[42:53]
specialized equipment. So just
[42:58]
a reminder, fleet does
[42:59]
maintain the vehicles and
[43:00]
equipment for the whole city.
[43:03]
Not just dpw. So when we start
[43:07]
talking about some of like the
[43:09]
fire equipment, specialized,
[43:10]
heavy machinery, some of that
[43:14]
needs to be outsourced to
[43:16]
either vendors to work on that
[43:17]
equipment. And that is where
[43:18]
we see that rising character,
[43:23]
3 cost. So this year, getting
[43:24]
bump up for them in their
[43:26]
budget and their base budget
[43:28]
will be really helpful.
[43:36]
And then a How we've been
[43:38]
prioritizing investment in our
[43:44]
equipment. Even since we
[43:46]
presented this slide 2 weeks
[43:48]
ago, we 3 more units to the
[43:52]
solid waste line. So it's a 16
[43:57]
units we've since had 3 more
[43:58]
Packers delivered and are out
[44:04]
on the street. It's been a big
[44:07]
group effort to be able to
[44:08]
spend this kind of money and
[44:10]
see this kind of result so
[44:11]
fast with the procurement
[44:13]
process. So we've received
[44:16]
100% of those solid waste
[44:18]
units within 7 months of
[44:23]
placing the order. So that
[44:25]
that above and beyond what we
[44:30]
ever expect. And then with the
[44:31]
operations group, we've got
[44:36]
the new additions to this. No
[44:39]
response team. A fleet for
[44:41]
about 12 full-size trucks and
[44:47]
20 to one times. The
[44:48]
additional street maintenance
[44:50]
equipment that we want
[44:52]
purchase. There's about 37.
[44:54]
Different types of machinery.
[44:58]
We have prepared. We have the
[45:00]
paint minor street repair
[45:01]
equipment, mowers, bucket
[45:06]
trucks. Anything like that.
[45:10]
Highlighting some of our
[45:14]
grants. The one we Mark Saint
[45:16]
reference earlier here is the
[45:19]
safe streets for all grant. We
[45:22]
have phase 2 scoping, but
[45:25]
you'll just awarded earlier
[45:27]
and that provide about
[45:29]
20 million to safe, safe
[45:32]
streets for all infrastructure
[45:39]
updates. We also have. The
[45:42]
office of sustainability with
[45:45]
ecb g Grant. We have recently
[45:48]
taking a new energy manager
[45:51]
and they're working alongside
[45:53]
Purdue with this grant. That
[45:55]
is a study and energy
[45:57]
consumption of government
[45:59]
buildings with the goal to
[46:01]
retrofit it with green
[46:04]
infrastructure from there. And
[46:06]
then here we have some grants
[46:10]
and action. The usda grant, we
[46:13]
have planted just over 1800
[46:16]
trees. You see the nickel
[46:20]
plate trail. This one huge
[46:22]
collaborative effort with
[46:24]
multiple funding sources
[46:26]
between the grants and the sea
[46:29]
icf connected Communities
[46:31]
program and then Merck's pill
[46:34]
and am removal. That is they
[46:37]
us sorry U.S. Fish and
[46:39]
Wildlife Grant to preserve the
[46:42]
ecosystem. Getting into our
[46:45]
capital improvement plan. I
[46:48]
will pass it off to you. Chief
[46:50]
financial officers and their
[46:52]
Thank you, Margaret. And you
[46:55]
thank you to both Margaret and
[46:58]
Antony. Start earlier, revenue
[47:01]
manager for extensive work on
[47:03]
this year's budget. I mean it
[47:05]
it presented here in AUGUST,
[47:07]
but this is really work that
[47:09]
starts as early as APRIL. And
[47:12]
we do it every year. So the
[47:15]
budget process is a lot. But I
[47:17]
think that it leads to lots of
[47:20]
important conversations about
[47:22]
how we prioritize our
[47:25]
resources depreciate the
[47:27]
opportunity to get to talk
[47:30]
about it with this body as
[47:32]
well. Moving on to the capital
[47:35]
improvement plan just as a
[47:37]
reminder, dpw produces
[47:39]
five-year capital improvement
[47:40]
plans. Every year we present
[47:42]
them to our Council Public
[47:43]
Works Committee represent them
[47:46]
to this board. They're not
[47:48]
formally voted on, but they're
[47:50]
part of our budget package and
[47:52]
make it endorsed through the
[47:54]
approval of the the overall
[47:56]
budget itself. We produce to
[47:57]
capital plans produce one for
[47:59]
the stormwater side and one
[48:00]
for the transportation side.
[48:02]
So we'll We'll show them
[48:03]
separately here this year. A
[48:05]
lot of work has gone into how
[48:07]
these are put together. I
[48:08]
think we've made some changes
[48:10]
that are helpful the sake of
[48:12]
transparency, both internally
[48:13]
and externally. And I hope
[48:15]
that that those changes are
[48:17]
apparent and helpful to to
[48:19]
folks as we present this
[48:21]
information. So with that
[48:23]
said, first up, going to talk
[48:24]
about storm water, which is
[48:25]
the smaller of the 2 programs,
[48:27]
but also very important. Well,
[48:29]
you can see here is our storm
[48:32]
water funding and expenses
[48:34]
broken down for each of the 5
[48:38]
years in the capital plan. You
[48:40]
can see about 139 million
[48:42]
dollars of funding and again,
[48:45]
this is a this is mostly a
[48:47]
reminder, but capital plans
[48:49]
are always intentionally over
[48:51]
program. This means expenses
[48:53]
will always exceed the amount
[48:54]
of funding in the plan. This
[48:55]
is because we want to make
[48:57]
sure we have an ample pipeline
[48:58]
of projects, projects
[49:00]
schedules, move around for all
[49:02]
sorts of reasons. And we faced
[49:04]
delays who want to make sure
[49:06]
that we have projects ready to
[49:08]
go teed up to make use of that
[49:09]
funding. In general. We try to
[49:11]
have less over programming in
[49:13]
the early years because we
[49:15]
need to be able to it make
[49:16]
immediate decisions about its
[49:17]
schedules and things like
[49:20]
that. And so you'll see more
[49:21]
over programming in the out
[49:23]
years of the capital plan. So
[49:24]
I'm not going to go through
[49:26]
every single line here, but I
[49:28]
did just want to call out 2
[49:30]
things about the stormwater
[49:31]
capital plan. And first on
[49:33]
this plan, you'll see new bond
[49:35]
funds that 2026 storm water
[49:38]
bond proceeds line those as
[49:40]
you heard today, those
[49:43]
declaratory resolutions and
[49:45]
other bond auctions usually go
[49:47]
through this board as well.
[49:49]
That 50 million dollars is
[49:51]
money. We issued that
[49:54]
supporting a whole whole
[49:55]
variety of projects over the
[49:58]
next 2 years. That's why you
[49:59]
see the funding split between
[50:01]
2026 2027. So excited to have
[50:03]
that funding those projects
[50:05]
moving. And then second, I
[50:07]
want to be clear about
[50:09]
something that's come up in
[50:11]
public discussions about our
[50:12]
budget and we're going to
[50:14]
you're going to see on a on a
[50:16]
a few slides down. This year.
[50:18]
Our budget includes using
[50:20]
5 million dollars of storm
[50:22]
water fees. That's going to
[50:24]
show up on the transportation
[50:26]
capital program. And you're
[50:28]
going to see that as a line
[50:30]
listed there. And while we're
[50:32]
here talking about storm
[50:34]
water, I just want to be clear
[50:36]
that we did not cut any storm
[50:38]
water projects. We did not
[50:40]
reduce the scope of any storm
[50:42]
water projects, the stormwater
[50:43]
capital plan has had that
[50:44]
revenue backfilled by a couple
[50:46]
different sources and by
[50:48]
reductions in administrative
[50:50]
costs. And so. The amount of
[50:51]
storm water fees going to
[50:54]
storm water, capital assets is
[50:57]
increased in this budget, not
[50:59]
decreased. It just happens
[51:02]
that 5 million dollars is
[51:04]
showing up on the
[51:07]
transportation side of the
[51:10]
ledger. We're going to be
[51:15]
working on a huge pipeline of
[51:18]
roadway projects over the next
[51:21]
5 years. Those projects. In
[51:25]
many cases have stormwater
[51:29]
components, whether it's
[51:33]
regrading the rotors, actual
[51:36]
investments in new storm water
[51:40]
drains and culverts and things
[51:43]
like that. And so we are we're
[51:47]
excited about all that work.
[51:50]
And I just wanted to be clear
[51:52]
that we're not we're not
[51:55]
cutting stormwater projects to
[51:59]
make that happen. It is it is.
[52:02]
Something that again, you'll
[52:06]
see here in a couple slides.
[52:10]
But I just wanted to talk
[52:13]
about here with what we have
[52:17]
the stormwater information on
[52:21]
the screen. Moving This slide
[52:24]
breaks down the 156 million
[52:28]
dollars of expenses in the
[52:32]
categories. Again, not going
[52:34]
to talk about every role you
[52:38]
can see. The biggest category
[52:41]
here is surface drainage
[52:44]
projects, but you can see the
[52:47]
other types of projects that
[52:49]
we have in our pipeline.
[52:52]
Moving on to the
[52:55]
transportation capital plan.
[52:57]
So before I show you the large
[53:00]
table that barely fits on the
[53:03]
screen here is hopefully an
[53:07]
easier break down to to look
[53:11]
at the funding sources by so
[53:13]
you can see on the left side
[53:17]
of the screen, you have a pie
[53:20]
chart that breaks down our
[53:23]
funding. That 1.2, 2 billion
[53:26]
dollars into buckets. So you
[53:29]
have general fund sources
[53:33]
which General city revenues
[53:36]
that could in theory be used
[53:39]
for lots of different city
[53:43]
purposes. You have
[53:45]
transportation taxes. That's
[53:48]
mostly going to be state road
[53:50]
funding distributions which
[53:53]
come from gas tax and things
[53:55]
like that. Other dpw revenues
[53:58]
which are specific to the
[54:02]
department, but not
[54:05]
necessarily roadways. The
[54:07]
Marion County Cmg line. That's
[54:12]
the 50 million dollars a year
[54:14]
from the state and its
[54:16]
200 million because there's
[54:19]
only 4 years about funding in
[54:22]
the capital plan. 27. 28 29.
[54:25]
30. And then you have one
[54:28]
time. Sources like fun
[54:31]
proceeds council fiscal
[54:34]
actions, money that's rolled
[54:38]
over from prior years. You can
[54:40]
see that in pink. You can see
[54:43]
grandson external. A lot of
[54:45]
that's going to be mpo
[54:48]
funding. But some of that's
[54:51]
going to be from other federal
[54:53]
grants as well. And then you
[54:55]
can see support from tif
[54:58]
districts, whether it's part
[55:02]
of an economic development
[55:05]
initiative or whether it's
[55:08]
just general tips support for
[55:11]
the capital. On the right side
[55:15]
of the screen. What we've
[55:18]
broken out is the ongoing
[55:21]
resources in each year of the
[55:24]
capital plan. So this is
[55:28]
excluding all the one-time
[55:31]
money. It's excluding the
[55:34]
federal, the federal dollars
[55:37]
that are part of our capital
[55:42]
Port program and just focusing
[55:46]
on kind of the stuff on the
[55:50]
right side of pie chart. And
[55:54]
you can see the funding
[55:59]
growing from 58 million
[56:04]
dollars in 2026. And then up
[56:09]
to 190 million dollars as we
[56:13]
later on new commitments from
[56:19]
local income taxes and the new
[56:23]
50 million dollars from the
[56:28]
state. And so again, you can
[56:33]
see see that growth on an
[56:37]
ongoing basis. And here you
[56:41]
have the full version of what
[56:46]
I showed you on the prior
[56:50]
slide broken broken down into
[56:53]
much more detail. They kind of
[56:57]
follow the same category
[57:00]
conventions. So transportation
[57:03]
specific funding includes
[57:06]
360 million dollars. General
[57:11]
city revenues. Again, this is
[57:16]
mostly going to be local
[57:21]
income taxes, adding up to
[57:25]
385 million dollars over 5
[57:30]
years. You can see the onetime
[57:34]
appropriations that would
[57:38]
include, for example, the
[57:41]
40 million dollar bond
[57:45]
issuance that we just
[57:48]
finalized recently came
[57:52]
through this board for
[57:54]
approval so that that money is
[57:57]
showing up down there in the
[58:00]
onetime section. And the
[58:03]
reason we do that is to make
[58:05]
it clear. Okay, what's actual?
[58:09]
New resources that we have to
[58:12]
dedicate in the budget every
[58:15]
year versus a one-time
[58:18]
supplement to what we're
[58:21]
doing. And then down below,
[58:25]
you can see 60 million dollars
[58:28]
from economic development
[58:32]
sources and just under
[58:35]
300 million dollars in
[58:39]
external funding. Most of that
[58:42]
being from from federal
[58:45]
sources. Again, you see the
[58:49]
storm water fees showing up
[58:52]
there 5 million a year
[58:55]
starting in 2027 that I just
[58:58]
discussed a moment ago. And so
[59:01]
I do want to just state this
[59:05]
because guessing there's going
[59:08]
to be questions about this.
[59:11]
And we went into a fair bit
[59:14]
detail about this a couple
[59:17]
weeks back. That committee,
[59:19]
the wheel tax money from
[59:22]
proposal, one 92, it's
[59:27]
projected generate about
[59:30]
70 million dollars a year is
[59:32]
not in this capital plan. So
[59:34]
it's not appropriated as part
[59:36]
of the budget. It's not
[59:38]
showing up here in this this
[59:40]
capital plan as I think. We
[59:43]
walked through probably
[59:45]
excruciating detail a couple
[59:47]
weeks back. Dpw has invested
[59:49]
substantial time and effort
[59:50]
into the framework for making
[59:53]
quick decisions about how to
[59:55]
prioritize roadway
[59:57]
investments. And Mark did a
[59:58]
great job spelling out what
[1:00:00]
that process looks like. So
[1:00:01]
all say about the proposal.
[1:00:03]
One 92 revenue is to the
[1:00:05]
extent that it generates
[1:00:07]
revenue. That's not included
[1:00:09]
in this capital plan. Dpw is
[1:00:11]
well positioned to make
[1:00:14]
allocation decisions that
[1:00:16]
optimize that money. And so,
[1:00:18]
you know, obviously those
[1:00:20]
conversations are going to
[1:00:23]
continue in the weeks and
[1:00:25]
months to come in. You know,
[1:00:27]
we're we're we're ready for a
[1:00:30]
larger volume of capital
[1:00:32]
funding. Wherever that comes
[1:00:35]
from. All right. This next
[1:00:37]
large table breaks down our
[1:00:40]
transportation capital plan by
[1:00:42]
programmatic funding area.
[1:00:45]
Again, this is a little bit
[1:00:46]
different than how we've
[1:00:48]
broken down playing in the
[1:00:49]
past or just said this is how
[1:00:51]
much goes to streets or
[1:00:53]
bridges or whatever. This this
[1:00:55]
gives you a little bit more
[1:00:57]
detail about how we kind of
[1:00:58]
control our budget internally.
[1:00:59]
And I hope I hope this this
[1:01:01]
helps folks get their heads
[1:01:03]
around it. But I think it's
[1:01:04]
been helpful. Exit exercise
[1:01:06]
for us to even put together
[1:01:07]
like this. Again, you'll see
[1:01:08]
that that 1.3 billion dollar
[1:01:11]
total spending number. I'm not
[1:01:14]
going to go through every
[1:01:17]
single one of these
[1:01:21]
categories. But you do see,
[1:01:24]
you know that the biggest
[1:01:28]
batch here is thoroughfare
[1:01:31]
projects at 467 million
[1:01:35]
thoroughfare and major
[1:01:38]
secondary streets. That is in
[1:01:40]
of itself. A total. There are
[1:01:44]
different types of projects
[1:01:46]
that live under that category
[1:01:49]
from minor rehab projects that
[1:01:52]
are going to look kind of like
[1:01:56]
the strip patching projects.
[1:01:58]
But more on the curb to curb a
[1:02:01]
sus 2 full on road
[1:02:05]
reconstruction We've we've
[1:02:07]
rolled up that, you know,
[1:02:11]
those different types of
[1:02:14]
projects in the one line
[1:02:18]
there. We have left broken out
[1:02:20]
some some things like
[1:02:23]
preventative maintenance, for
[1:02:27]
example, where we're being
[1:02:29]
explicit about wanting to do
[1:02:32]
more things like crack sealing
[1:02:34]
to maintain our assets. That's
[1:02:37]
a big staple of our I said
[1:02:40]
management plan. We broke that
[1:02:42]
strip patching because I think
[1:02:45]
Kimberly because people are
[1:02:47]
used to seeing it broken out
[1:02:50]
on this page. I think again
[1:02:53]
and a lot of cases, these
[1:02:56]
minor rehab projects that are
[1:02:58]
engineering department is
[1:03:01]
working on might look and feel
[1:03:04]
like the strip patching
[1:03:06]
projects and the speed in
[1:03:09]
which they rolled out when
[1:03:12]
they can happen in the season.
[1:03:15]
But the you know, strip
[1:03:17]
patching remains as an option
[1:03:20]
for emergency repairs and
[1:03:23]
getting our roadways into, you
[1:03:26]
know, safe condition as
[1:03:29]
needed. And then. You see
[1:03:31]
local street funding which is
[1:03:34]
increased to 24 million a year
[1:03:37]
starting in 2027 again within
[1:03:40]
that category. There's
[1:03:43]
different types of projects to
[1:03:46]
different sorts of treatments
[1:03:48]
depending on. What the
[1:03:51]
condition of the roadway is.
[1:03:54]
But still, I think helps to
[1:03:56]
give a sense of of how we've
[1:03:58]
made allocation decisions. And
[1:04:00]
then there's the different
[1:04:03]
buckets of of federal types of
[1:04:06]
projects and those are broken
[1:04:08]
out because well, you could
[1:04:09]
combine mpo streets with our
[1:04:12]
other street categories.
[1:04:14]
Oftentimes the goals are a
[1:04:16]
little bit different rate the
[1:04:18]
goals with these projects are
[1:04:21]
typically more than asset
[1:04:23]
management. Often safety
[1:04:25]
focused and have, you know.
[1:04:27]
Bigger picture goals than just
[1:04:29]
extending the life of the
[1:04:30]
asset. Moving on to the next
[1:04:31]
slide. Here's a kind of rolled
[1:04:33]
up version of what I just
[1:04:35]
showed. You said that the
[1:04:38]
numbers here are the same. No
[1:04:40]
match up. But we've broken it
[1:04:42]
down into thoroughfares and
[1:04:44]
secondary streets, which is
[1:04:46]
the biggest category. You can
[1:04:47]
see bridge projects, local
[1:04:48]
road projects, preventative
[1:04:49]
maintenance and repairs.
[1:04:51]
Again, that would include
[1:04:53]
preventative maintenance
[1:04:54]
strip, patching the job or
[1:04:56]
contract program that we used
[1:04:58]
to make fast repairs when
[1:04:59]
things like guardrails or
[1:05:00]
damaged. And then economic
[1:05:02]
development, which is usually
[1:05:03]
funded by specific tip funding
[1:05:04]
for, you know, something like.
[1:05:06]
Georgia Street or some of the
[1:05:07]
work we're doing, by the way,
[1:05:08]
campus, things like that
[1:05:09]
multi-modal, it's going to be
[1:05:11]
sidewalks and greenways
[1:05:12]
traffic others is a mix of
[1:05:14]
things. It would include
[1:05:16]
things like the community
[1:05:17]
powered infrastructure program
[1:05:18]
that. Don't necessarily fall
[1:05:20]
into one category could affect
[1:05:21]
different types of
[1:05:22]
infrastructure. Finally, as
[1:05:23]
always, here's a report on xp
[1:05:24]
spending breakdown. Not going
[1:05:25]
to go into detail on this, but
[1:05:27]
we we provide this along with
[1:05:28]
their budget every year. It's
[1:05:31]
available. Happy to answer
[1:05:32]
questions about it. With that,
[1:05:33]
I'm sure you all have some
[1:05:34]
questions for us. We got a
[1:05:36]
bunch of people from dpw
[1:05:37]
present. So hopefully we
[1:05:39]
hopefully we can Thank you
[1:05:40]
very much. Cfo Sanderson
[1:05:42]
assistance cfo Margaret
[1:05:43]
Wilson, for that, the tow
[1:05:45]
breakdown of our budget by
[1:05:46]
ordinance. We are to bring the
[1:05:48]
budget before the board for
[1:05:49]
review. So that's what we're
[1:05:50]
doing will open it up for the
[1:05:51]
group Texan questions or
[1:05:52]
comments. Please. Jump in.
[1:05:53]
Couple of higher level
[1:05:54]
questions here budget for
[1:05:55]
inflation. Are these old 20
[1:05:56]
$26? These are all in 20 $26.
[1:05:58]
Thank in. Seeing staffing. It
[1:05:59]
was member of vacant positions
[1:06:01]
the engineering due to my
[1:06:02]
heart shows 11 vacancies, new
[1:06:03]
future here. But is the money
[1:06:05]
for those for those positions
[1:06:06]
in the budget. Yes, yes. The
[1:06:07]
money for those positions is
[1:06:08]
in the budget. As Margaret
[1:06:10]
mentioned, when she went over
[1:06:11]
the slide. The good news is we
[1:06:12]
have had success getting
[1:06:14]
people in some important
[1:06:16]
Obviously, you know, I'm not
[1:06:18]
going to sit here and say that
[1:06:19]
filling some of these roses
[1:06:21]
and a challenge, especially,
[1:06:23]
you know, the more technical
[1:06:25]
they get the smaller pool of
[1:06:27]
people out there. You know, it
[1:06:29]
exists to fill that specific
[1:06:30]
role. But the money for these
[1:06:33]
lines is absolutely included
[1:06:35]
in the budget. We're hopeful
[1:06:36]
that some citywide policy
[1:06:38]
changes like stepping grade
[1:06:40]
will make it easier compensate
[1:06:42]
people for their experience
[1:06:44]
with the city and keep people
[1:06:46]
in those roles. When we do get
[1:06:48]
them. But obviously, you know,
[1:06:50]
given the amount of output in
[1:06:52]
our capital program, making
[1:06:53]
sure that engineering is
[1:06:55]
staffed and has the tools that
[1:06:58]
they need is you know, we
[1:07:00]
agree. It's it's a critical
[1:07:02]
time for that. Just thank you.
[1:07:03]
It's good to know the revenue
[1:07:05]
sources for 2027. What it was
[1:07:06]
based on is that conservatives
[1:07:08]
are really get how sure you of
[1:07:10]
this, you have a new sources.
[1:07:12]
Kind of it's kind of different
[1:07:14]
for everyone. So I can walk
[1:07:16]
through This isn't every
[1:07:17]
single source of revenue the
[1:07:19]
dpw has. This is like our 5
[1:07:20]
biggest revenue sources and
[1:07:21]
again, I would note here just
[1:07:23]
for clarity that will tax
[1:07:24]
number that 16.6 That's the
[1:07:26]
pre proposal. One 92 baseline,
[1:07:27]
which is why at 16 and not 86
[1:07:28]
or something. So the first
[1:07:29]
line that's our state road
[1:07:30]
funding distributions that we
[1:07:31]
we hear so much about. And so
[1:07:33]
the main thing driving the
[1:07:34]
growth there is is that there
[1:07:35]
is a gas, excise tax and
[1:07:36]
special fuel tax inflator. I'm
[1:07:37]
so like next year, JULY first,
[1:07:38]
2027. There will be a penny
[1:07:39]
increase under statute for the
[1:07:40]
gas, excise tax and a $0.02
[1:07:41]
increase for the special feels
[1:07:42]
tax. So that's driving. That's
[1:07:43]
pretty much where you're
[1:07:44]
getting that 3% growth. This
[1:07:45]
from that inflator. The storm
[1:07:46]
water user fee has inflator in
[1:07:47]
local ordinance. So it goes up
[1:07:49]
by a little bit over 3%. The
[1:07:51]
rate that's built on people's
[1:07:52]
monthly stormwater bills. It's
[1:07:53]
paid through the property tax
[1:07:54]
system. So most of the growth
[1:07:55]
comes from that. Although we
[1:07:57]
do have a little bit of
[1:07:58]
measured, impervious surface
[1:07:59]
area growth every year as
[1:08:00]
well. That helps contribute to
[1:08:01]
stormwater revenue growth. The
[1:08:02]
solid waste user Any growth to
[1:08:03]
be driven by adding additional
[1:08:05]
parcels. So one thing that's
[1:08:06]
been beneficial this year is
[1:08:07]
our rollout of the lrs
[1:08:08]
contract has resulted a chance
[1:08:09]
to kind of holistically. Look
[1:08:11]
at our address is that we're
[1:08:12]
providing service to in those
[1:08:13]
contractor We have been able
[1:08:14]
to make some updates there and
[1:08:15]
then that solid Waste, Special
[1:08:16]
Service District is that's
[1:08:18]
that's a property tax levy,
[1:08:18]
which its property taxes. And
[1:08:19]
then there's other Associated
[1:08:20]
State money that comes with
[1:08:21]
property tax distributions.
[1:08:22]
That is. Kind of a general
[1:08:23]
city revenue in the sense that
[1:08:24]
it's property taxes, but it is
[1:08:25]
specific to the spot. Solid
[1:08:26]
waste, Special services
[1:08:27]
district since actually
[1:08:28]
approved separately as part of
[1:08:29]
the annual budget process.
[1:08:30]
That was a long answer. Your
[1:08:31]
question. But basically it's
[1:08:32]
all it's all dependent on the
[1:08:33]
revenue source. And there's
[1:08:35]
different factors that drive
[1:08:36]
growth in each of them. Sure.
[1:08:38]
But but reasonable based on
[1:08:40]
what we know today, correct.
[1:08:41]
The Office of Finance and
[1:08:42]
Management has a lot of
[1:08:44]
conservative practices that
[1:08:46]
you don't see here. And one of
[1:08:47]
them is like things like
[1:08:48]
interest revenue, which we
[1:08:49]
generate a lot of the city has
[1:08:51]
a lot of money in the bank
[1:08:53]
that generates a return.
[1:08:55]
Interest is an example of
[1:08:56]
something that's typically
[1:08:57]
either not budgeted or very
[1:08:59]
conservatively budgeted. And
[1:09:01]
fm has like a bunch of
[1:09:03]
citywide protocols. They used
[1:09:04]
to make sure that there are
[1:09:05]
conservative assumptions baked
[1:09:07]
into not just our budget but
[1:09:08]
every city agency when they go
[1:09:09]
through the revenue
[1:09:11]
forecasting process. Thank you
[1:09:12]
in know you're gonna street
[1:09:14]
lighting was a an issue in
[1:09:16]
those negotiations. I think
[1:09:18]
going on with the U.S. Far
[1:09:19]
rates. And that's where is all
[1:09:20]
been resolved this budget
[1:09:22]
contains. The green numbers.
[1:09:23]
Yeah, there is rate increase
[1:09:25]
and forgive me. I I don't know
[1:09:26]
the date goes into effect. But
[1:09:28]
we half that planned and
[1:09:29]
budgeted. Just it's within our
[1:09:31]
engineering division.
[1:09:32]
Dream number. And on the
[1:09:33]
right, we the budget for
[1:09:34]
street like utilities. There.
[1:09:35]
And that's We're that increase
[1:09:36]
with a yes, no. Okay. So it's
[1:09:37]
so you know, for sure that's
[1:09:38]
good. And I want at this for
[1:09:40]
sure is maybe a bit too, just
[1:09:41]
in you know what? With with
[1:09:42]
knowing that the increase is
[1:09:43]
coming we can look at that
[1:09:43]
previous bills and and take
[1:09:44]
that percentage go from there
[1:09:45]
with with that include
[1:09:46]
increased tree lighting.
[1:09:47]
Whereas I think that would
[1:09:48]
maybe be more with we can
[1:09:49]
project themselves within the
[1:09:50]
capital program for what
[1:09:51]
street lights would come out
[1:09:52]
from there. Ok, thank you for
[1:09:53]
that. Moving on to storm
[1:09:54]
water. Storm water capital,
[1:09:54]
12.8 million the bit. That
[1:09:55]
would go pretty fast. I would
[1:09:56]
think. Spurs and number. And
[1:09:57]
you know, the expenditures as
[1:09:58]
we as we show yet. 26 27.
[1:09:59]
Okay. But then the really go
[1:09:59]
down. 28 29, 30. Because we're
[1:10:01]
not gonna lot of these
[1:10:02]
projects off the list or is it
[1:10:02]
because that could back
[1:10:03]
because it will be moving some
[1:10:05]
of the projects out beyond
[1:10:05]
2030. So a couple. Point of
[1:10:07]
clarification. So earlier on
[1:10:07]
we have our our budget broken
[1:10:08]
out into program. Attic
[1:10:08]
categories and that is those
[1:10:09]
are numbers that are like
[1:10:10]
literally included in the
[1:10:10]
budget ordinance. The council
[1:10:11]
has to adopt and get submitted
[1:10:12]
to the state. The capital plan
[1:10:12]
itself includes a mix of
[1:10:13]
creation, is that are included
[1:10:14]
in the next year's budget. And
[1:10:14]
then also other funding
[1:10:15]
sources. So like, for example,
[1:10:16]
you see here. The grant
[1:10:17]
funding, the bought the bond
[1:10:18]
proceeds. Those are
[1:10:19]
necessarily included in the
[1:10:20]
appropriation totals that you
[1:10:21]
see on budget slide site. It's
[1:10:21]
kind of easier to talk about
[1:10:22]
the stormwater capital plan
[1:10:23]
here because it's a more
[1:10:24]
holistic picture. To answer
[1:10:25]
your question. Like there.
[1:10:25]
There's almost always when you
[1:10:26]
look at the 5 year capital
[1:10:27]
plan. A trend like this, where
[1:10:27]
you're going to see more work
[1:10:28]
in the front years because we
[1:10:28]
just have more information
[1:10:29]
about the funding that's
[1:10:30]
available to us in the earlier
[1:10:30]
years. We know what grants we
[1:10:31]
currently have awarded. We
[1:10:32]
might not know what grants
[1:10:33]
will have awarded in 2030 that
[1:10:33]
we're currently spending
[1:10:34]
funding on. We've applied, you
[1:10:35]
know, we've applied for storm
[1:10:36]
water related project funding
[1:10:37]
that we hope to have access
[1:10:38]
to. But we don't included in
[1:10:39]
here until we have a pretty
[1:10:39]
good sense. It's actually
[1:10:40]
going to be available to us.
[1:10:41]
The bond issuances, you know,
[1:10:41]
we got to the point where we
[1:10:42]
can say with 100% confidence
[1:10:43]
that it was a good time to
[1:10:43]
move forward with fish and
[1:10:44]
50 million dollars and more
[1:10:45]
bonds, a sponsor rated
[1:10:45]
Triple-a when they reviewed by
[1:10:46]
a credit rating agency. As
[1:10:47]
always, you know, we have
[1:10:47]
extremely good credit and
[1:10:48]
robust fight. Financial
[1:10:49]
management strategies for the
[1:10:49]
district. At this point, we
[1:10:50]
don't have another bond
[1:10:50]
issuance showing up in one of
[1:10:51]
the out years. But that
[1:10:52]
doesn't mean that there's no
[1:10:53]
possible way that the city
[1:10:53]
will issue more storm water
[1:10:54]
pond. So I think part of this
[1:10:55]
is just a little bit more
[1:10:55]
certainty around what
[1:10:56]
resources you have available
[1:10:57]
in the earlier years. But
[1:10:58]
yeah, continue to work to
[1:10:59]
identify funding sources
[1:11:00]
whether its external or
[1:11:01]
internal to find more storm
[1:11:02]
water projects as we move
[1:11:02]
forward. That I could add as
[1:11:03]
well. I know you had mentioned
[1:11:04]
the 12 million from that
[1:11:05]
programs of slide for
[1:11:06]
engineering for the storm
[1:11:07]
water division. But this slide
[1:11:08]
again does do better job of
[1:11:08]
breaking that down where that
[1:11:09]
first column top half the
[1:11:11]
local funds, that's kind of
[1:11:12]
about what that 10.9 would for
[1:11:13]
going to torch that capital
[1:11:14]
program of those dedicated
[1:11:16]
funds and then beyond that,
[1:11:17]
still, we have that
[1:11:19]
48 Million. That is the
[1:11:20]
additional funds that Sam was
[1:11:21]
mentioning with Bonds and
[1:11:23]
prior year carryover, anything
[1:11:24]
like that. So that does add to
[1:11:25]
that program robustly from
[1:11:27]
there. Okay. So it's quite
[1:11:28]
possible that in these later
[1:11:29]
years. 28 29 30, that more
[1:11:30]
revenues could come up
[1:11:32]
projects to be done. We just
[1:11:33]
haven't. Yeah. So my guess is
[1:11:34]
when we're presenting, let's
[1:11:35]
say that 2028 through 2032
[1:11:36]
capital plan and a couple of
[1:11:37]
years that the number for 2028
[1:11:37]
will be higher than what
[1:11:38]
you're you're seeing here,
[1:11:39]
that if you look back at prior
[1:11:40]
year capital plan, that's
[1:11:41]
almost always the way it
[1:11:42]
works. We present a five-year
[1:11:42]
capital plan with the funding
[1:11:43]
that we know to be available.
[1:11:44]
I want piggyback on that,
[1:11:45]
though. I see the storm. Water
[1:11:46]
user fees are here. Get This
[1:11:47]
one is expenditures. This
[1:11:47]
particular table that we're
[1:11:48]
looking right now this. So
[1:11:49]
this this table, it is more
[1:11:49]
the revenue table. So this is
[1:11:50]
showing this is showing
[1:11:51]
sources of funding for the
[1:11:52]
stormwater program. Adding up
[1:11:52]
to 139 million dollars over 5
[1:11:53]
years. Okay. And so but we
[1:11:54]
have just fees for inflation
[1:11:55]
every year. So this to the
[1:11:56]
stormwater fee that the storm
[1:11:57]
water user fee. Has an
[1:11:58]
inflation adjuster that goes
[1:11:59]
through 2030, 40 in our local
[1:12:00]
municipal ordinance. And so
[1:12:00]
right now, it's bill, like
[1:12:01]
there's base billing unit late
[1:12:02]
assigned to each property in
[1:12:02]
the area. Right now, I think
[1:12:05]
it's a $1.65 per be which
[1:12:06]
admittedly a confusing fee
[1:12:09]
structure. So take. To get it.
[1:12:14]
What you're question. The
[1:12:15]
storm, water user fee funds a
[1:12:17]
bunch of different stuff and
[1:12:18]
dpw is budget. So it is a
[1:12:21]
funding source for our channel
[1:12:22]
Maintenance subdivision of
[1:12:23]
operations. For example, it
[1:12:25]
helps cover the cost of our
[1:12:30]
forestry Division and the
[1:12:30]
Capital program is one of the
[1:12:34]
things that it helps not
[1:12:35]
shown. Here is the debt
[1:12:36]
service that we're using it
[1:12:39]
for. So, you know, there's a
[1:12:40]
substantial chunk of
[1:12:41]
stormwater fees that goes to
[1:12:43]
debt service on. Year. Bond
[1:12:44]
issuances that we've used to
[1:12:45]
from the stormwater capital
[1:12:51]
plan. So the I'm sorry, what
[1:12:55]
was your question? I think I
[1:12:56]
can step into. I think the
[1:12:59]
confusion as thought the 500
[1:13:00]
staying the same that this is
[1:13:04]
not revenue of that storm
[1:13:08]
water use. Your feels the top
[1:13:13]
line and second line, are one
[1:13:17]
and then we have broken out
[1:13:19]
500,000 for the regular
[1:13:20]
regulations, regulatory
[1:13:24]
compliance projects that we do
[1:13:25]
what the water quality group
[1:13:28]
with an engineering. So
[1:13:33]
500,000 is there. Programmed
[1:13:35]
amount for that work that
[1:13:35]
they're doing out of the
[1:13:39]
storm. Water user fee. Does
[1:13:58]
that help? I'm sorry. Yes.
[1:13:59]
That is that is everything
[1:14:00]
that murder just said is
[1:14:00]
correct in everything you just
[1:14:04]
I just want to make sure this
[1:14:05]
question. So my question is
[1:14:12]
these. Fees are adjusted for
[1:14:14]
inflation. All of these
[1:14:17]
numbers are in 20 $26. Yes.
[1:14:18]
Which means if the number
[1:14:21]
remains the same. In 27. 28.
[1:14:28]
29. 30. Inflation excess.
[1:14:30]
We're spending is actually
[1:14:33]
decreasing across time.
[1:14:34]
Because the dollar buys less
[1:14:38]
and 2030 that. We can, we can
[1:14:39]
look back at prior year
[1:14:41]
versions of the this sheet
[1:14:42]
that we put together. And
[1:14:47]
again, this is. I think it
[1:14:48]
consistent format that we've
[1:14:49]
used to Shar five-year capital
[1:14:51]
plan. As far as I can
[1:14:55]
remember, we've shown. This
[1:14:56]
the same way. So this is not
[1:14:58]
anything that there's no
[1:14:59]
change to how are displaying
[1:15:00]
our storm. Water user fees.
[1:15:02]
What I will tell you is is
[1:15:05]
that there are. A variety of
[1:15:08]
revenue source is going into
[1:15:09]
the storm. Water Management
[1:15:09]
fund, which again gets used
[1:15:10]
for a mix of operations and
[1:15:15]
capital. If you if you want to
[1:15:19]
look at it that way, you can.
[1:15:20]
But again, this isn't that
[1:15:21]
isn't anything specific to
[1:15:22]
this capital plan that would
[1:15:24]
you could say that about?
[1:15:26]
Parsed the way we present our
[1:15:27]
stormwater capital plan almost
[1:15:32]
any year. So. After the
[1:15:36]
flooding. That happened, folks
[1:15:38]
about to see more money for
[1:15:41]
stormwater possible. I think I
[1:15:42]
think you're definitely right.
[1:15:44]
Kind of what I'm going for. I
[1:15:47]
think that, you know,
[1:15:48]
obviously the last couple
[1:15:51]
weeks has been. Very impactful
[1:15:55]
to our residents, our public
[1:15:56]
officials, our staff and, you
[1:16:00]
know, our our storm, water,
[1:16:01]
engineering staff, our
[1:16:03]
stormwater operations team
[1:16:05]
thinks about flooding events
[1:16:07]
all the time, right? This is
[1:16:09]
core to their job. There were
[1:16:11]
car flood response getting
[1:16:12]
their work on maintaining our
[1:16:14]
infrastructure. And This is a
[1:16:20]
year round. Perennial exercise
[1:16:27]
there's a charger here. Yeah,
[1:16:29]
we absolutely agree that this
[1:16:30]
is a good time to focus on our
[1:16:33]
storm water assets just
[1:16:35]
procedural point. Obviously,
[1:16:36]
this budget is introduced, you
[1:16:39]
know, beginning of AUGUST and
[1:16:40]
the major flooding that
[1:16:42]
occurred a couple weeks ago
[1:16:43]
would have occurred. Actually,
[1:16:45]
we presenting our budget to
[1:16:46]
our council committee while,
[1:16:48]
you know, rain was still
[1:16:49]
falling and we had people out
[1:16:51]
removing, you know, trees from
[1:16:52]
roads clearing out storm storm
[1:16:53]
drains and stuff. So, you
[1:16:56]
know, we our storm water
[1:16:59]
program remains robust. And as
[1:17:03]
I said, we to that point, we
[1:17:04]
just issued 50 million dollars
[1:17:05]
of new bonds to fund
[1:17:08]
stormwater projects throughout
[1:17:09]
the district. Continue to
[1:17:11]
explore ways that things like
[1:17:13]
flood control improvement
[1:17:14]
districts can better support
[1:17:15]
stormwater projects. And you
[1:17:18]
actually see in increased
[1:17:20]
commitment fc id's going into
[1:17:20]
the stormwater capital plan.
[1:17:21]
You see that number going from
[1:17:25]
2.2 million to 3.2 next year.
[1:17:26]
That reflects increased volume
[1:17:28]
of work in specific areas that
[1:17:32]
have flood control improvement
[1:17:33]
districts established. There
[1:17:34]
are federal funding
[1:17:38]
opportunities that we continue
[1:17:40]
That we continue to go after
[1:17:42]
and then finally not to dwell
[1:17:44]
on this, but the 5 million
[1:17:45]
dollars of storm water fees
[1:17:46]
going to transportation.
[1:17:49]
That's new. Again. That is
[1:17:54]
going to. That is going to
[1:17:55]
lead to real investments in
[1:17:56]
our storm. Water
[1:17:59]
infrastructure and well, a lot
[1:18:02]
of those assets might not be,
[1:18:03]
you know, geared towards this
[1:18:05]
specific type of flooding
[1:18:06]
event, the most common type of
[1:18:08]
flooding event that we
[1:18:08]
experience in the city is it
[1:18:11]
just rains a lot. And the
[1:18:12]
water doesn't drain
[1:18:13]
appropriately off of our
[1:18:14]
roadways and it's a danger for
[1:18:16]
motorists damages people's
[1:18:18]
property. And so our ability
[1:18:20]
to go out there do these
[1:18:21]
roadway improvements. And at
[1:18:22]
the same time make appreciable
[1:18:23]
changes that impact our storm
[1:18:25]
water system is a real
[1:18:27]
investment here. Regardless of
[1:18:28]
whether it shows up on this
[1:18:30]
page or the warning for slides
[1:18:31]
after it. So but your point is
[1:18:36]
well taken. I've come a couple
[1:18:37]
questions on the
[1:18:40]
transportation capital plan.
[1:18:42]
So I see the community powered
[1:18:43]
infrastructure program is more
[1:18:46]
than doubling from 2026. To
[1:18:50]
27. We love to see that. We're
[1:18:54]
going from 1.2 million 26 to
[1:18:55]
4.1 million and twenty-seven
[1:18:58]
and I was hoping somebody.
[1:18:59]
Could elaborate on just what
[1:19:02]
all means. I can give I can
[1:19:05]
give a number answer. I think
[1:19:06]
if we've Chris, I don't know
[1:19:07]
if you want to talk a little
[1:19:09]
bit about the cpi program in
[1:19:10]
general and some of the
[1:19:11]
success we've had recently
[1:19:13]
getting those projects off the
[1:19:15]
ground. Some of this reflects
[1:19:18]
the timing when projects are
[1:19:20]
able to bid, which is
[1:19:21]
obviously impacted by a bunch
[1:19:22]
of different factors. And that
[1:19:24]
can to year to year variance.
[1:19:29]
What we have seen. He's just a
[1:19:32]
really sizable demand for
[1:19:33]
these projects. And there's a
[1:19:36]
large pipeline of of projects
[1:19:37]
that we have to I'm gonna let
[1:19:40]
Chris talk a little bit about
[1:19:41]
that work. Yeah, good
[1:19:44]
afternoon. So community power
[1:19:47]
and infrastructure is an
[1:19:48]
umbrella under which
[1:19:50]
Indianapolis neighborhood
[1:19:51]
Infrastructure Partnership.
[1:19:53]
And part in the right of way
[1:19:54]
live. So this increase in
[1:19:58]
capacity is do too increased
[1:20:00]
demand. I guess you could say
[1:20:01]
and excitement for the
[1:20:03]
program. We had 17 planned
[1:20:05]
projects for this year and
[1:20:06]
we're trying to match an
[1:20:08]
increase. Those costs are
[1:20:10]
dollars and also increase our
[1:20:11]
lending library that is
[1:20:12]
available to folks at no
[1:20:19]
charge. And then my other
[1:20:21]
question is with relation to
[1:20:22]
the rapid response line item.
[1:20:27]
What is that? Thanks, Chris.
[1:20:30]
We under again going to going
[1:20:31]
to defer some of the projects
[1:20:32]
Pacific's. That's one area
[1:20:34]
where we had previously had
[1:20:35]
one-time funding sources that
[1:20:40]
we've used to fund these rapid
[1:20:41]
response projects laundrie's
[1:20:43]
going to go into a little bit
[1:20:44]
of detail on. But one thing
[1:20:46]
that we've done here is
[1:20:47]
established and ongoing level
[1:20:48]
of support that we can build
[1:20:49]
on. So that we can have a
[1:20:51]
little bit more ability to
[1:20:55]
plan. Those types of projects
[1:20:56]
and not have to be reliant on
[1:20:59]
one time allocations from
[1:21:01]
fiscal this koala cations from
[1:21:02]
the council things like that.
[1:21:05]
So under a one a. Yes. Thank
[1:21:08]
you. Board members level
[1:21:10]
Vision, 0 Administrator. So
[1:21:11]
Rep response is a new program
[1:21:13]
that we're launching off here
[1:21:15]
and dpw such as a traffic
[1:21:16]
safety program that kind
[1:21:18]
support multiple programs,
[1:21:19]
whether that's our cpi program
[1:21:23]
was a fatal crash of you and
[1:21:25]
some of our common own safety
[1:21:26]
concerns throughout the
[1:21:28]
community making those safety
[1:21:29]
and permits. So how this
[1:21:32]
started. It is last year the
[1:21:34]
council approved 500,000 in
[1:21:36]
the spring, fiscal for some of
[1:21:39]
the projects that we
[1:21:41]
implemented earlier this year.
[1:21:42]
And then later on, because we
[1:21:44]
share that with the council's
[1:21:46]
on the needed improvement that
[1:21:48]
we have for the fatal crash
[1:21:50]
review team and additional
[1:21:52]
1 million dollars was
[1:21:54]
allocated. It's part of the
[1:21:56]
fall fiscal. So how we broke
[1:21:58]
that up. Half a million
[1:22:00]
dollars continue. Love those
[1:22:02]
projects from the fatal crash
[1:22:04]
review team. We met those out
[1:22:06]
those have been designing
[1:22:07]
going going and construction
[1:22:08]
party later on this year or
[1:22:11]
early next year. And then we
[1:22:12]
set 400,000 aside for. Kind of
[1:22:14]
quick Bill Repor response
[1:22:15]
materials. So that the
[1:22:16]
criminal Process actively
[1:22:18]
happening right now. That bit
[1:22:20]
process just took place. And
[1:22:22]
so currently return those
[1:22:23]
materials allow us to rapidly
[1:22:26]
respond to some safety
[1:22:28]
concerns in the community,
[1:22:30]
especially those who do a
[1:22:33]
tactical urbanism If you do it
[1:22:35]
urban isn't project and we
[1:22:37]
look at safety improvements
[1:22:39]
that we see the statistic 7,
[1:22:41]
how much just had impact on
[1:22:43]
the community, then we can
[1:22:45]
transit transition those
[1:22:46]
impactful with some rapid
[1:22:47]
response materials. However,
[1:22:48]
rapid response also want to
[1:22:50]
support our like I mentioned
[1:22:52]
before fatal crash review team
[1:22:53]
and other programs we have
[1:22:55]
like neighbor way were we can
[1:22:56]
deploy those materials
[1:22:58]
internally and make sure we
[1:23:00]
support those community
[1:23:02]
projects and also to really
[1:23:03]
respond to communities who
[1:23:05]
have concerns about traffic
[1:23:06]
safety in general. Thank you.
[1:23:08]
Thank Thank you. Wasn't for
[1:23:10]
questions. Do we have any
[1:23:12]
other questions from board
[1:23:13]
members? Wilson and thank you
[1:23:16]
very much. Thank you for the
[1:23:18]
presentation. Very
[1:23:19]
informative. We don't have any
[1:23:20]
other business to come before
[1:23:22]
the board that time. A motion
[1:23:25]
to adjourn. Please. So moved
[1:23:29]
by Jesus revenue of a second
[1:23:32]
seconded by subjected to want
[1:23:34]
Thank you all. This meeting
[1:23:45]
adjourned.