[0:08]
All right, it is 6:34 p.m. on Wednesday,
August 20th. I am going to call this
[0:14]
meeting to order of the Mattress
Planning Commission. Um, we'll first do
[0:19]
a roll call. It looks like um you can
start. Commissioner Eder is here.
[0:26]
Commissioner Urban is here.
Commissioner Kendall is here and we have
[0:32]
Commissioner Garrett and Commissioner
Reynolds absent this evening. Do we have
[0:36]
a quorum? Chair, you have a quorum.
>> All right. All right. We will move on
[0:42]
with our consent agenda.
We can approve. These are all from four
[0:48]
different meetings. Um we do not need to
approve them individually, but has
[0:52]
everyone had a chance to review the
meeting minutes?
[1:00]
I'm gonna always correct.
>> They are. Uh you guys are very accurate
[1:06]
on those. Um so if I can get a motion to
approve the and you can say the four
[1:10]
dates that are listed here and we can
approve them all at once. This is
[1:14]
Commissioner Eder and I approve the
minutes for April 2nd, 2025, May 21st,
[1:21]
2025, June 4th, 2025, and August 6th of
2025 for the planning commission. And
[1:29]
» I second the motion.
>> All right, I have a first and a second.
[1:33]
All those in favor say I.
>> I.
[1:35]
» I. I. All right, everybody here says
approved. Moving on, we will move on to
[1:42]
the public hearing. The public hearing
is MP-25-1
[1:48]
Mule Deere Estates Master Plan
Development. For those that are in the
[1:52]
audience, we kind of go through a set
agenda on these um as far as the order
[1:58]
of the meeting. I'm going to read a
document that is a lot of um words so I
[2:04]
try to say it fast but just in general
the um we'll open the hearing I'll read
[2:10]
this complex document then staff has a
chance to report on the proposal and
[2:18]
then we hear from the applicant we hear
from any uh proponents
[2:24]
which are people that are for we hear
any neutral testimony and then we will
[2:29]
hear from opponent testimony. Sorry.
During that section, we will have the
[2:33]
opportunity to hear comments from um you
if you are here to make a comment and
[2:38]
then the applicant will have a chance to
talk about anything that was mentioned
[2:42]
in those three sections above. And then
after that, we will see if we have any
[2:47]
other questions for staff and then we
will have a the commission will have a
[2:50]
chance to discuss the item before us um
before we decide to make a decision or
[2:56]
keep the public hearing open and make a
decision later. that type of thing. So,
[3:01]
here we go with the long statement.
Please stay with me. This is the time
[3:05]
and place set for hearing on planning
file number MP25-1.
[3:10]
The hearing is now called to order. The
hearing will proceed as follows. Staff
[3:15]
will present the staff report. Applicant
will present its application and
[3:19]
supporting evidence. Any interested
persons will then be provided the
[3:22]
opportunity to present testimony or
evidence in support, evidence that is
[3:26]
neutral, or evidence that is in
opposition. Applicant, as the party
[3:30]
bearing the burden of proof, will then
be afforded an opportunity to present
[3:34]
rebuttal testimony. Staff will provide
closing comments. Any party may request
[3:40]
that the written record remain open to
respond to testimony presented at the
[3:45]
hearing. At the conclusion of this
hearing, the planning commission may
[3:49]
close the public hearing and deliberate
towards a decision, close the public
[3:53]
hearing and defer deliberations towards
a decision at a date and time certain,
[3:57]
or continue the public hearing at a date
and time certain. All testimony,
[4:02]
argument, and evidence must be directed
to the applicable criteria or any other
[4:06]
approval criteria you believe to be
applicable. Matters unrelated to the
[4:11]
application are not pertinent to the
planning commission's decision in these
[4:14]
proceedings. Failure on the part of any
person to raise an issue that is not
[4:18]
specific enough to afford the planning
commission and parties to this
[4:21]
proceeding an opportunity to respond to
the issue precludes appeal to the city
[4:24]
council and land use board of appeals on
that issue. Failure of the applicant to
[4:29]
raise constitutional or other issues
relating to conditions of approval with
[4:32]
sufficient relevance to allow the local
government or its designate to respond
[4:36]
to the issue precludes an action for
damages in circuit court. Commissioners
[4:40]
must disclose any exparte contacts
including site visits, biases or
[4:45]
conflicts of interest. Does any
commissioner have anything to disclose
[4:49]
and if so please state the nature?
>> This is Commissioner Eder and I do not.
[4:56]
Commissioner Kendall, I do not.
>> Commissioner Urban, I do not.
[5:02]
Does any party wish to challenge any
member of the hearings body based on
[5:07]
exparte context, biases or conflicts?
[5:12]
Okay, seeing none, we will now listen to
the staff deliver the staff report.
[5:18]
Okay, thank you. So this is file uh MP
25-1.
[5:26]
It's for the um the lot shown on the
screen. It's identified as 1113 12CA 900
[5:34]
and 600. You'll see on your agenda um
we're discussing this in two separate
[5:39]
items. We've split it between the master
plan development and the subdivision. Um
[5:44]
this is just to kind of break things up
um administratively for you all. The
[5:48]
master plan is more of a bird's eye view
of the development. Um while the
[5:52]
subdivision we can get into the
nitty-gritty kind of lot development
[5:55]
standards um specific. So uh here you
can see that the proposed uh development
[6:02]
is on southeast McTagert
um Southeast 10th Street and Southeast J
[6:07]
Street. It's composed uh of two lots. Uh
the kind of the demarcation line is up
[6:13]
here um on the northern knob. It's an
acre and a half zoned R1 and to the
[6:19]
south it's uh zoned R3. The total site
is 13 acres in size and they're
[6:26]
proposing 21 hound town homes in 47
single family dwellings for a 68 lot
[6:32]
subdivision.
Um you'll remember from our housing
[6:36]
capacity analysis that um all housing in
Madress is uh needed housing. We require
[6:42]
affordable housing um high income
housing and all different types single
[6:47]
family building and town and town homes
and uh per uh Oregon statute OS197
[6:55]
uh307
we need to adopt clear and objective
[6:58]
standards to review this development. So
we can't take a discretionary path when
[7:03]
um reviewing this criteria. Some of that
criteria is making sure that public
[7:08]
facilities have adequate capacity to
serve the development. We also look at
[7:13]
our municipal code and requirements as
far as um how many uh housing types are
[7:20]
proposed on the uh development based off
of the the lots proposed and then um
[7:27]
compliance with uh applicable code
requirements.
[7:31]
So, taking a look at the plat here, let
me move this so you can see it.
[7:37]
Um, you can see that they're proposing a
mix of town homes and single family
[7:41]
dwellings. Code requires that if you're
doing more than uh 50 lots in a
[7:45]
subdivision, you need um at least two
dwelling types. So, they meet that
[7:49]
requirement. And they can't um propose
say like 48 single family dwellings in
[7:56]
two town homes. it has to they can't
exceed or yeah exceed over 80% of a um
[8:02]
single housing type. So this breaks down
to about 70% single family dwellings and
[8:07]
30% town homes. Um we've looked at
density. So this northern part here, you
[8:13]
can see this blue line is kind of where
you see the R1 zone and the R3. R1
[8:18]
requires uh at least four dwellings per
acre and they uh are proposing 4.1. And
[8:25]
then down here in the R3, it's six
dwellings per acre and they're proposing
[8:29]
6.1. So they're kind of on that lower
threshold, but they're still meeting our
[8:32]
requirement. And we also looked at um
our code requirements for uh
[8:39]
infrastructure. Specifically, uh we
looked at the traffic impass impact
[8:44]
analysis provided. So the key point
points from that um is that no capacity
[8:50]
mitigation mitigation is required.
They're not going to need to install any
[8:54]
kind of traffic lights or special turn
lanes um for this development because
[8:58]
they're on the lower capacity of um
density. They are actually like 50% of
[9:04]
the uh maximum theoretical that the site
could be developed to. So that's uh good
[9:10]
for the area. And um all study
intersections will continue to meet the
[9:15]
city's level of service standards and
ODAT ODOT mobility targets. So, I'll
[9:20]
leave um this plan up here if you guys
want to refer to it while asking
[9:25]
questions and give Craig a chance if he
wants to chime in on anything.
[9:35]
Does the commission have any questions
for staff at this point?
[9:39]
» No.
>> Okay. So, now we will hear from the
[9:42]
applicant.
If the applicant would like to come
[9:46]
forward, state your name. You've been
here before.
[9:49]
It's been a couple years.
[9:57]
I think the red light. Yep. Okay. Uh,
good evening, commission. My name is
[10:01]
Hayes McCoy. I'm the civil engineer for
the applicant who's Gary Alers, who is
[10:05]
here this evening. And, um, I don't have
much to add to, uh, Bethy's report. The
[10:14]
one reason I the one reason I wanted to
state why we were on the lower of the
[10:19]
density is there's a lot of topography
on this site and if you've seen it
[10:23]
driving down Jane Street and how
couldn't you um there's a big drop off
[10:27]
so
the trying to meet you know be uh it
[10:33]
lends itself to a lower density
otherwise uh
[10:39]
uh higher density will require a lot
more grading. Now we have some with town
[10:44]
homes. Um but uh if we had say
apartments or anything uh it would it
[10:51]
would really increase the cost of the
project. So anyway that's all I have to
[10:56]
add is the reason for the density. Do
you have any questions for me?
[10:59]
» So I guess I do have a couple questions.
So, the neighborhood that's across from
[11:04]
the street, the street on J Street has
very steep lots and fencing around
[11:12]
um
>> I know which lots you're talking about.
[11:16]
» Is that a similar look or is this
um are you know is this development
[11:23]
going to have
I guess a better setback elevation
[11:28]
change?
>> Okay. because you're you're talking
[11:30]
about those lots where the fence goes
way down and towards the intersection of
[11:35]
Mlofflin and J Street. Uh th this one
would look different. We don't you know
[11:39]
the closest thing we have is up on phase
4. Um
[11:45]
and I can't read the lot number there.
So there's a handful that get close to
[11:52]
that. Lot 65 I think is what it looks
like near phase four. So, there's a
[11:58]
handful that could enter that criteria,
but um I don't think those lots are
[12:04]
nearly as big as the ones you're
referring to at Strawberry Heights.
[12:09]
» These lots will have a grade.
>> Those ones will uh 65 would be one. Um,
[12:21]
» and all it looks like from just the
schematics that we have that the
[12:25]
entrance and exits to these lots would
be from an interior street as opposed to
[12:29]
J Street itself.
>> Correct. Your public works director
[12:33]
would not allow me to access J Street,
but we we'll have a pedestrian trail
[12:38]
connection actually that's intended to
be lined up with the intersection of
[12:43]
where um 10th comes in.
>> Oh, good.
[12:46]
» From the south, it doesn't show up on
that map, but uh that was one thing that
[12:51]
we were asked to put in. Well, it does
seem we know that this lot is crossed a
[12:57]
lot by people who live in the adjacent
subdivision. Um, so just making sure
[13:02]
that that pedestrian traffic that's
going to the schools, you know, I assume
[13:07]
the sidewalk will be
>> on J Street and 10th.
[13:12]
» Well, we we'll have a sidewalk along J
Street. It'll be adjacent to the curb,
[13:17]
but we'll also um
we're also supposed to have a pedestrian
[13:22]
connection. And that one will be u
there's there's a drop off from there.
[13:28]
So, it'll have to come from J Street and
it'll kind of come down like a ramp.
[13:32]
» Okay.
>> And then go between two lots, then it'll
[13:34]
enter the subdivision. And the nice
thing about that, I think the city, what
[13:38]
this reason the city was asking us to do
that is it gets kids who would be
[13:43]
walking to Buff Elementary, walking
through a neighborhood instead of J
[13:48]
Street, which you know, sometimes people
speed on that street.
[13:52]
» Yeah. No, I I've definitely seen some
things happen on that street that
[13:56]
shouldn't happen. So,
>> okay. Walking through a neighborhood is
[14:00]
safer.
>> Yes,
[14:01]
» definitely. That's That's where I'd
prefer my my kid to go.
[14:07]
» Um, do you anyone have any questions for
the applicant at this point?
[14:16]
» Uh, what phase are you working on
presently?
[14:21]
Are you trying to get approval for? Is
it phase
[14:24]
because you've got phase three,
phase two?
[14:29]
Yes, that's
>> we have them all, but which ones are
[14:32]
you? Is phase one going to be the first
one?
[14:35]
» Yes. So,
>> phase four is where there's that real
[14:40]
» phase four has some topographic
challenges. So,
[14:44]
» right now we're just approving
for phase one or are we approving for
[14:51]
the whole thing? I believe it's for all
the whole thing, but I believe in the
[14:55]
packet there's a page that has the
expected date for each phase
[15:00]
implementation. Perfect.
That might give you some information
[15:04]
there.
>> Okay. So, fall of 25, phase 2, 26, phase
[15:08]
three. Okay. So, it's spread out.
>> 24 9 six 21.
[15:17]
» And so, the town homes would be all part
of phase three.
[15:20]
» Three. Correct.
[15:27]
» Um I don't know if this is relevant or
not, but is this like more affordable
[15:33]
housing or is this along the medium um
price housing of the area?
[15:40]
» Um market rate, there's no affordable
housing or or goal to meet an AMU. It's
[15:47]
what the market allow.
>> That's right. Okay.
[15:54]
This isn't relevant, but I just feel
like in the morning it's crazy on Jay
[15:59]
and and is it buff
>> with the stop sign with this growth. I
[16:05]
really feel like at some point public
works will have to put in a light there
[16:09]
with with how bad the traffic will get.
>> But that's not relevant to your guys'
[16:15]
plan. I'm just I'm just commenting that
traffic there in the morning. and I go
[16:18]
every morning and it is that stop sign
is crazy.
[16:22]
» Can I respond to that just a little bit
though because maybe maybe it's well
[16:27]
more traffic is always frustrating. So,
uh one of the features one of the things
[16:33]
that public works did ask us at our
southeast corner. You'll see that
[16:38]
rounded off lot right there. And the
purpose of that is in the future when
[16:43]
traffic is more crazy than maybe it
already is, uh, the city hopes to have a
[16:47]
roundabout there to to help with traffic
and turning vehicles. So,
[16:54]
um,
[16:59]
» any other questions for the applicant?
Okay. Thank you.
[17:02]
» Thank you.
[17:07]
» Okay. Uh, we will now receive public
testimony. When you testify, please
[17:12]
state your name and address for the
record. All testimony shall be directed
[17:16]
to the planning commission and not to
the applicant, staff, or other members
[17:20]
of the audience. If you have a question
for another party, please direct your
[17:23]
question to the planning commission
chair, and the chair will determine
[17:26]
whether a response from the other party
is appropriate. Please keep your
[17:30]
testimony concise and relevant to the
issues before us this evening. It is
[17:33]
perfectly acceptable and encouraged to
indicate that you agree with the points
[17:37]
made by another party instead of
reiterating the point. Testimony will be
[17:41]
received in the following order. Persons
persons speaking in support of the
[17:45]
application, persons who wish to provide
neutral testimony, and then persons who
[17:50]
wish to provide opposition testimony.
Finally, we will hear rebuttal argument
[17:54]
from the applicant to the testimony
provided. Who would like to testify in
[17:59]
support of the application? Is there
anyone here or online
[18:08]
who would like to provide neutral
testimony? Neutral testimony is
[18:11]
testimony that does not express an
opinion or an approval or denial of the
[18:16]
application but addresses the issues
involved in the proceedings such as site
[18:19]
design, conditions of approval or
similar items.
[18:24]
Anyone online for neutral?
>> Chair, I believe we have someone for
[18:27]
neutral.
>> Okay, go ahead. Looks like it's Jerome.
[18:32]
» Hello.
>> Can you hear me?
[18:33]
» Yes. Thank you. Jerome, can you please
state your address for the record?
[18:37]
» It is 811 Southeast 10th Street,
Madress, Oregon 97741.
[18:43]
My full name is Jerome Turbate.
Um,
[18:48]
» go ahead.
>> So, I have a question because on the
[18:50]
plans of this, a portion of the
culde-sac in phase 4 is part of my
[18:55]
property line and I haven't had a
discussion with anybody about this. Um,
[19:01]
if you guys approve this, like is this
something that you guys are you allowed
[19:05]
to just take part of my property for
this development
[19:09]
or is this something that needs to be
discussed between myself and the owner
[19:13]
of the land that's developing this?
>> No, I believe that the city probably
[19:17]
provided you a notice, but that is not
normal uh course of action for the city
[19:23]
to take a property. There may be an
easement um that is part of that, but I
[19:29]
can maybe have staff respond to that if
possible.
[19:37]
Um so I would maybe like the applicant
to respond to that if that's possible.
[19:43]
If you Okay, that'd be great. Would
would you mind going on?
[19:46]
» The applicant is going to respond to
your question. And just to be clear, do
[19:49]
you do you know which lot we're talking
about here? I don't. It's the lot just
[19:55]
north of phase 4. That like rhombus
rectangular lot.
[20:01]
» So I think is it the one that says
TL700?
[20:05]
» Yeah, I think so. It's a little blurry
the presentation so it's hard for me to
[20:08]
see but yeah. Yeah, TL700. That one
right there.
[20:11]
» Okay. And I know when when I first
bought this property three years ago,
[20:15]
somebody I think the owner of this came
and talked to us about this about it
[20:18]
possibly being future plans, but that
was the only discussion I had about this
[20:23]
subject until I received um the letter
about this meeting.
[20:28]
» Okay, go ahead applicant.
>> Okay, good evening Jerome. My name is
[20:31]
Hayes McCoy. I'm uh representing
applicant. So to answer questions, uh
[20:37]
no, you don't have to give up your land.
um we would need to approach you and in
[20:43]
this process first we're trying to seek
an approval of this development. Now
[20:48]
phase four is one of the later phases
but at that as the time we are getting
[20:54]
closer to where we're planning the
construction
[20:58]
uh myself
one of the owners the developers perhaps
[21:03]
with the city would discuss potentially
uh purchasing or asking you to dedicate
[21:09]
that rightaway at that time and that can
be negotiated. Now, you may decide, you
[21:15]
know what, I really don't want to do
that. And that's fine, too. And we would
[21:17]
need to modify our subdivision
accordingly. Um, the reason we show it
[21:22]
where it currently is, which does show
us, assuming we could acquire your
[21:28]
property, is because we would be
directly across Sun Drive. And at
[21:31]
intersections, we we want to try to line
up those streets as best as possible.
[21:36]
» I'm guessing this is his, but see, it
would come this is probably his property
[21:41]
line comes here. So, it's a it's the
road. Can you put the map back up? So,
[21:45]
it's the road going into the culdesac
that's on his property.
[21:50]
» Yes.
>> Yeah. There was a there was another
[21:54]
photo earlier that showed the where that
road was overlapping as well.
[21:58]
» Yep. No, I see that. So, the culde-sac
would be
[22:03]
» Yeah.
>> through kind of the end part of your
[22:07]
property there.
>> Yeah. which I am, you know,
[22:11]
» I'm totally up foreigner
>> um, you know, discussion if the plans
[22:15]
get approved. Uh, I just wanted to make
sure that the city approving the plans
[22:19]
didn't like, you know, I didn't have to
forfeit that portion of the land because
[22:22]
it's in the plans because I'm not, you
know, I'm not a lawyer. I have no idea
[22:26]
what the, you know, legality of that is.
>> No, that I think that's a valid question
[22:30]
that you have, but no. Um, as uh, um,
Mr. Hayes has said that that is kind of
[22:38]
wishful thinking on their part after
they come together with an agreement
[22:41]
with the current property owner for
those lines.
[22:44]
The
question before us today is more about
[22:48]
the master plan big picture items,
right?
[22:52]
» It's not the specifics and and that
would not be a normal process where we
[22:56]
could approve in a meeting like this
somebody losing a portion of their
[23:00]
property. So, it sounds like you will be
approached at some point to talk about
[23:04]
that and then it would be up to you to
decide whether or not you are willing to
[23:09]
come to terms with that. If not, then
the property owner would have to adjust
[23:14]
their plans for that phase.
>> Okay. No, that totally makes sense. I
[23:18]
just wanted to double check. I do have
other questions about the development as
[23:21]
well. Um, if that's okay.
>> Sure. Um so is is this development going
[23:27]
to be because of the increased traffic
of you know 68 homes I believe it was um
[23:33]
some of them town homes the you know
it's a pretty it's a few hundred people
[23:37]
that are going to be in the area. Is
there going to is there going to be like
[23:40]
any effort for noise dampening with J
Street right there, which is a pretty I
[23:44]
mean Tenth is also a super busy street.
Um and Jay's pretty busy as well. And so
[23:50]
I think the increased traffic might just
create more natural noise because it's
[23:53]
going to be busier. Are there any has
there been any thought on that? So, um,
[23:58]
as mentioned earlier in the meeting,
whenever a master plan comes forth, we
[24:03]
do have to work with the public works
director and also the Oregon Department
[24:07]
of Transportation to review the plan to
make sure that it meets the thresholds
[24:13]
for the roads that are currently in
place. Um, also any new developments
[24:19]
have to meet the design code set forth
by the city. Um, so those questions have
[24:25]
been answered during the applicant
process of of just filling out the forms
[24:31]
and coming forward to the city. Um, so
from what I understand, those questions
[24:36]
have been addressed through those
analyses from the public works
[24:39]
department and the Oregon Department of
Transportation. Is that correct, staff?
[24:44]
They have um placed conditions of
approval for improvements, but they have
[24:48]
not stipulated anything as far as um
noise dampening.
[24:53]
» Okay. And all this information is in the
previous meeting notes that led up to
[24:56]
the the master plan being brought forth.
Right.
[25:01]
» So when uh a plan like this comes forth,
usually the applicant meets with city
[25:06]
staff over multiple time periods and
over multiple document reviews. and it
[25:13]
usually comes to the planning commission
at a point where um they've been able to
[25:17]
say these are the things that must
happen in order for this to be approved.
[25:21]
Um so those discussions have happened
from the city and they are all part of
[25:27]
the big block of papers that we've
reviewed in this hearing and that packet
[25:33]
is available in your uh publicly if you
wanted to download that. But you also
[25:39]
are welcome to schedule a meeting to
talk with staff about any questions or
[25:44]
specifics that you have outside of this
meeting because this is still in
[25:49]
development phases and um they have the
knowledge to answer questions um in
[25:57]
their office at any time.
>> Okay. Uh and then this you're saying
[26:01]
this information is available in the
packet that's attached to this meeting.
[26:05]
» Okay. Perfect. All right. I'll just I'll
look through that and if I have
[26:08]
questions I'll I'll get with one of the
staff members.
[26:11]
» Definitely. And and even if it's that
you just want to talk with them, the
[26:15]
city planning people would love to hear
more from people who live in our area
[26:20]
who have general questions. I think even
just hearing more about how this process
[26:25]
works is helpful to people. So, um even
if you just wanted to meet with them
[26:31]
about how things work, um they would be
happy to meet with you.
[26:36]
Okay. Yeah, totally. I appreciate it.
Thank you.
[26:38]
» You're welcome.
All right. Do we have any other neutral
[26:42]
testimony?
All right.
[26:47]
So, we now will listen. Thank you for
coming forward. We will now uh accept
[26:53]
testimony in opposition. Do we have any
testimony in opposition?
[27:00]
Anyone online?
[27:07]
Okay. Do you does the applicant uh feel
like you need to provide any further
[27:13]
information from what has been
discussed?
[27:17]
» Okay. Does the staff wish to provide
anything further at this time?
[27:21]
» No.
>> Okay. So now commission we have three
[27:25]
options. We can close the public hearing
and deliberate towards a decision or we
[27:30]
can close the hearing and defer
deliberation to a time and date certain
[27:34]
or we can continue the public hearing to
a date and time certain. How are you all
[27:39]
feeling?
>> Um I have just one additional question.
[27:42]
» Sure.
Um that's to staff with regards to uh
[27:47]
the gentleman Jerome had asked
all those analysis of extra traffic and
[27:55]
all those things have been done and have
met the criteria. Um but there with his
[28:01]
um concern about noise, is there
something specifically that addresses
[28:06]
that in our code or is that just in
general part of the analysis?
[28:13]
We do have noise ordinances. Um but I
don't believe that that's included in
[28:18]
our traffic impact analysis unless I'm
mistaken.
[28:21]
» No, no, there'd be nothing applicable to
the master plan or subdivision that's in
[28:26]
the code. uh you know related to noise
mitigation or anything like that.
[28:31]
There's making sure there's not an undue
impact on infrastructure, sewer, water
[28:35]
streets, but nothing particular to the
noise that would that would come from
[28:40]
kind of those
>> J street is a busy street. It's um high
[28:44]
traffic no matter what. So anytime you
build more, it's just going to add to
[28:49]
that unfortunately.
>> Yeah. Okay.
[28:50]
» It's a private development project, so
they're obviously having to work through
[28:54]
the code. If it was a public works
project that they were taking on, that
[28:57]
might be something that they that they
have discretion over engage more with
[29:01]
the public on.
>> Okay. Thank you.
[29:07]
» I would like to um close the hearing and
deliberate towards a decision. You guys
[29:13]
are good.
>> Um I second. All right. I have a motion
[29:18]
on the floor to close the public hearing
and move towards deliberation. All those
[29:21]
in favor say I.
>> I. I motion carries. All right, the
[29:25]
public hearing is closed. Okay, so let's
see. Do you guys have any questions
[29:31]
specifically for staff at this time?
[29:37]
» I um the last two meetings we've kind of
seen more infill type projects, which I
[29:43]
think is exciting because they use
current roads, current infrastructure,
[29:48]
current sewer. um that I feel like that
is a good use of our um resources. I do
[29:56]
understand that every house that is next
to a vacant lot that is hard to see new
[30:03]
things coming in, but that is part of
our job is to make sure that land is
[30:07]
being used thoughtfully and
appropriately. And this subdevelopment
[30:13]
is a similar to other developments near
it and would fill in a blank space in
[30:20]
our community. Um, and provide more
housing for new people to move here or
[30:25]
people who've been living in apartments
to move into houses. So, um, I look at
[30:29]
that as a an exciting project, but also
knowing that growth sometimes is is hard
[30:34]
when we live in a small community.
[30:38]
» Agree. It's a It's a great spot. I drive
by it every day and um see the kids
[30:44]
walking through it. So, it's great
location for the schools and I think
[30:49]
it's a it's exciting for our town.
>> I do have a question. I'm not sure who
[30:55]
to address it to, but because it's near
the schools is the bus route
[31:03]
» on off of J.
No buses come through that to pick up
[31:08]
kids. It's all walking to Buff and
middle school and high school. Okay.
[31:12]
» There is a spot that the kids get picked
up for the middle school and it's a
[31:16]
little bit more down the road by the
pines.
[31:18]
» Okay.
>> And they have a few of those spots for
[31:20]
the middle school kids.
>> Okay.
[31:23]
Okay. So, foot traffic.
>> Okay. Thank you.
[31:30]
So, if we don't have any more
discussion, I can take a motion to
[31:33]
either approve or not approve.
This is Commissioner Eder, and I would
[31:41]
make a motion to approve the master plan
development for the Mule Deer Estates.
[31:53]
» Is this the master plan or we're doing
[32:00]
I second the motion.
>> All right, I have a first and a second.
[32:05]
All those in favor say I.
>> I.
[32:08]
» I. I. Motion carries.
All right. We will now move on to the mu
[32:15]
deer estate subdivision application
which is related.
[32:21]
Okay. So,
do I need to read the same thing? Oh,
[32:26]
great. Okay. I'm sorry.
Um, we will now hear the our I'm opening
[32:35]
the hearing for planning file number SP
or SD-25-1,
[32:41]
the MU deer estate subdivision
application. The hearing is now called
[32:45]
to order. We will proceed as follows.
The staff will present, the applicant
[32:50]
will present, and then any interested
persons will then be provided the
[32:53]
opportunity to present testimony in
support that is neutral or that is in
[32:58]
opposition. The applicant then can
respond to that. The staff will provide
[33:03]
closing comments and any party may
request that the written record remain
[33:06]
open to respond to testimony presented
at this hearing. At the conclusion of
[33:11]
the hearing, the planning commission may
close the public hearing and deliberate
[33:15]
or close the public hearing and defer
deliberations
[33:18]
or they can continue the public hearing
at a date and time certain. All
[33:22]
testimony, argument, and evidence must
be directed to the applicable criteria
[33:26]
or any other approval criteria you
believe to be applicable. Matters
[33:29]
unrelated to the application are not
pertinent to the planning commission's
[33:32]
decisions in these proceedings. Failure
on the part of any person to raise an
[33:36]
issue that is not specific enough to
afford the planning commission and
[33:39]
parties to this proceeding an
opportunity to respond to the issue
[33:42]
precludes appeal to the city council and
land use board of appeals on the issue.
[33:46]
Failure of the applicant to raise
constitutional or other issues relating
[33:49]
to conditions of approval with
sufficient relevance to allow the local
[33:53]
government or its designate to respond
to the issue precludes an action for
[33:56]
damages in circuit court. Commissioners
must disclose any expiree contacts,
[34:02]
biases, or conflicts of incidents. Does
any commissioner have those?
[34:06]
» Uh, Commissioner Kendall, I do not.
Commissioner Eder, and I do not.
[34:10]
Commissioner Urban, and I do not. Does
any party here wish to challenge those
[34:15]
statements?
All right. Seeing none, we will move on
[34:18]
to the staff report.
Okay. Thank you.
[34:23]
Um, for the sake of the record, this is
SD25-1
[34:28]
and it's for tax lots uh 1113 12CA 600
and 900. So, we did discuss um some of
[34:36]
the components of this subdivision
application, namely the infrastructure
[34:41]
improvements. Um, as mentioned, we sent
out um notices to our public works
[34:46]
director and he provided a memorandum
stipulating certain conditions of
[34:50]
approval for this development.
Um all roads are required to uh dedicate
[34:56]
rightaway to meet our major collector uh
road standards. Um those familiar with
[35:01]
the area know that uh Southeast McTagert
does not have a sidewalk here on the
[35:05]
west side. So they'll be required to do
a six-foot sidewalk and planter strip on
[35:10]
there. Along um Southeast 10th Street,
uh the same condition applies where
[35:16]
they'll have to do a planter strip and
sidewalk as well. Hayes pointed out that
[35:21]
um there will be a pedestrian crossing
from Strawberry Heights to J Street.
[35:26]
That includes ADA ramps um those blinky
pedestrian crossing signs and um street
[35:31]
lights. There will also be another one
to the north um to the south um driveway
[35:39]
to Buff Elementary School there. So
that'll improve a lot of connectivity
[35:44]
for um children walking to school every
day. It'll give them a place to cross
[35:49]
safely.
Um
[35:52]
yeah, and as mentioned, so all um access
to the lots is from those local streets.
[35:57]
So we're kind of avoiding a situation
you get like on B Street where
[36:01]
somebody's going 50 miles per hour and
somebody's trying to back into their
[36:04]
driveway there. So um it should keep
things relatively safe um as far as
[36:08]
access into those lots go.
Um lot development standards. Um, as I
[36:14]
mentioned, there's two different zoning
districts and two different housing
[36:16]
types. So, those have their own specific
um, lot size requirements. The applicant
[36:22]
has met or exceeded those requirements.
Um, we also have frontage requirements.
[36:27]
So, the lot has to be extended a certain
length along the roadway depending on
[36:31]
where it is, culde-sac or a regular lot
or a town home. They've met those as
[36:36]
well. Um, and block lengths and
perimeters. So the block that they
[36:40]
proposed uh meets all of those
requirements as well because there is uh
[36:45]
town homes proposed um they are required
to do uh 200 ft of or square feet of
[36:52]
common area per town home development.
Um that's going to be located to the um
[37:00]
west of the town home development there.
uh it comes out to a requirement of
[37:04]
about 4,200 square feet of common area
and they've exceeded that. They're
[37:09]
around I think 5600
a little over 1,000 square foot. Um so
[37:16]
they've met that as well. Um basically
they've met all of the design standards
[37:22]
um that we look at when we review these
subdivisions. So is there any questions
[37:28]
you guys have?
[38:00]
are the in our in our map it shows the
ones lower that are closer together
[38:07]
that makes that L those are the town
homes.
[38:11]
» Yeah, I can pull up um there's a
probably a better photo where they're
[38:15]
all highlighted green.
>> Yeah. So, all of these green ones here
[38:18]
are town homes. And then this kind of
hashmark area is the common area back
[38:23]
here.
[38:30]
» What is this lot here?
>> So, on that schematic, um, Commissioner
[38:35]
Kendall is noticing that there is a
little block that says future middle
[38:39]
housing. Is that a city thing or is that
from the applicant or
[38:45]
that is from the applicant? Um, I assume
that they just have not decided as far
[38:50]
as what type of development they want to
put there. Probably multiple town homes
[38:55]
or detach duplex. Go ahead. Yeah, the
applicant will speak to that.
[39:01]
» Yeah.
>> Do we have any other questions for staff
[39:06]
at this point?
[39:10]
Okay. So, now we will hear from the
applicant.
[39:14]
You get to come up again.
[39:19]
It works out that way. Uh, okay. So, the
only thing I would like to speak to is
[39:25]
the middle housing. Of course, if you
have questions, please ask. So, the
[39:30]
middle housing is not shaded uh green
because it's not going to be platted as
[39:35]
a town home lot. Instead, it's going to
be platted as a separate unit of land.
[39:41]
And then we have to use a different
process to create that as a town home
[39:46]
lot. And um middle housing was passed,
Greg probably knows, but uh a few years
[39:53]
ago, which allows for higher density.
And so when we were putting together
[39:58]
this subdivision, that middle housing
area would not quite meet the regular
[40:05]
subdivision code, but it meets middle
housing criteria. And since it's around
[40:10]
a bunch of other town homes, it it will
end up looking like a town home in the
[40:14]
end. It's just the process we have to
use as middle housing to get it there.
[40:19]
» How many acres is it?
>> Oh, I don't even know if it's a quarter
[40:24]
acre.
>> It's pretty small.
[40:30]
» So that's more of a lot size that just
has to fit a different process. Yes.
[40:35]
» And a different criteria.
>> Yes.
[40:38]
And would access from to that be from
within that Sun Drive?
[40:44]
» Uh, no. Access would would be a private
shared driveway across the front of lots
[40:50]
49 and 50.
>> Okay. But not from J Street.
[40:56]
» No, not from J Street.
>> Sort of an easement.
[41:02]
» Oh, okay. Um, it would be through an
easement. Correct. and we would run
[41:07]
utilities through an easement. So the
middle housing
[41:12]
is part of lot 49. So uh lot 49 overall
including the area that's not green
[41:19]
would be 6768 square feet. And then we
would come back through through a middle
[41:25]
housing land division and create three
town homes there that would look real
[41:30]
similar to the other town homes in the
area.
[41:32]
» Okay, that makes sense. So, the green
shading on that particular lot is a
[41:36]
little misnomer, but
>> it gives me something to talk about.
[41:41]
» I don't see where they would enter into
that because
[41:48]
» through lot 48.
So, whoever purchases lot 48, they will
[41:53]
know that they will be sharing an
easement.
[41:56]
Um it wouldn't be I don't it might be
partially through lot 48 but when we
[42:01]
plat the subdivision
we'll provide there will be an easement
[42:07]
an access easement and um I think our
plan is to put it across the front of
[42:14]
lots 50 lot 50 and 49. So the driveway
would be there and be shared between lot
[42:20]
50 and 49.
>> Okay. So they would come in up on
[42:26]
lot.
No, it looks like you have an opening up
[42:31]
on lot 51.
>> It could be there, too.
[42:36]
It could be both 50 and 51, but at least
50 because we'd want to have about 20
[42:43]
feet for the access.
[42:50]
Okay. And so whoever purchases those
three lots will know ahead of time that
[42:56]
they will be sharing an easement.
>> Yes. But the process usually is the home
[43:01]
gets built and then platted and then the
buyer's building a home. So all those
[43:06]
encumbrances,
it's seen there's a driveway there. It's
[43:10]
u it's not somebody buying a bare lot
and realizing later, oh my gosh, there's
[43:15]
a driveway through the front of my
property.
[43:19]
» They will know ahead of time.
>> Yes.
[43:21]
» Okay.
[43:25]
» Anything else?
>> No.
[43:28]
» Okay.
[43:32]
» So, they are pointing if maybe Yep.
Bethany. Yep. right there at the the
[43:37]
last lot there is where the future
middle housing it's in little tiny print
[43:42]
but that's the three lots that we're
kind of talking about the lot 49
[43:47]
» 50 and 5
>> 50 and 51 as they may have a portion of
[43:51]
a street there but from what the
applicant was saying those will be
[43:56]
developed the town homes will be put on
it and then it will be noted for sale
[44:00]
this isn't like you were getting at
someone purchasing bare land and
[44:05]
building this as part of a planned
subdivision.
[44:08]
» Correct.
>> Everything will be
[44:14]
brought forth to the people, the buyers.
We'll know ahead of time
[44:19]
» and to to make sure of that because
we'll have to put an easement on our
[44:26]
subdivision plat otherwise
it won't be there and then lot 49 won't
[44:32]
be able to be developed into three
units. We kind
[44:36]
» it wouldn't be accessible then.
>> Yes. Then then we would have boxed
[44:39]
ourselves into a corner that we don't
want to be in.
[44:41]
» Exactly. So you do those easements
through the city planning and we have
[44:46]
everything in place for that.
>> Yeah. When they come through that for
[44:51]
that final plat. So this is the
preliminary approval. They come through
[44:54]
the final plat engineering does do a
review of that to make sure that all
[44:59]
necessary easements where they be access
utilities are on that plat um before it
[45:04]
gets recorded with the county and that
any purchaser of that property is going
[45:08]
to be able to identify any easements
that exist on that property. Excellent.
[45:12]
Thank you.
>> You're welcome.
[45:14]
» Thank you.
>> You're welcome. Do
[45:15]
» you have any questions?
>> Okay. So, now we will receive public
[45:20]
testimony. When you testify, please
state your name and address for the
[45:24]
record. All testimony will be directed
to the planning commission and not the
[45:27]
applicant, staff, or other members of
the audience.
[45:31]
Um, please keep your testimony concise
and relevant to the issues before us
[45:34]
this evening. It is perfectly acceptable
and courage to indicate that you agree
[45:37]
with the points made by another party.
Uh, do we have anyone speaking in
[45:42]
support of the application?
Anyone online?
[45:48]
Do we have anyone
with neutral testimony
[45:53]
or general questions like Jerome in the
previous discussion?
[45:58]
» Yeah, I do again.
>> Okay, great. If you can state your name
[46:01]
again, we can get your address from the
last.
[46:04]
» Yep. My name is Jerome Turviate. Um, and
you don't need me to do my address
[46:08]
again.
I don't think you need to. Thank you.
[46:12]
» Okay. Um, so question for the
development is I look through I'm
[46:16]
looking through the packet and I don't
see
[46:19]
um a ton of stuff about dust abatement.
Um, when it comes to construction
[46:25]
because there's a lot of I mean there's
a lot of dead trees and stuff out there.
[46:28]
There's going to need to be some sort of
excavation done. It's a lot of dust to
[46:33]
be kicked up. There's quite a few people
that live in the area um that don't want
[46:38]
to really be exposed to a ton of silica.
Is there the only thing I'm seeing is
[46:42]
that there hasn't been really a plan
submitted and in other areas it says
[46:46]
that they'll obtain a permit from public
works uh for excavation that requires
[46:50]
dust abatement. But does that like uh
does that make them uh beholden to some
[46:57]
sort of requirements for like is there a
certain level of dust exposure that's
[47:02]
allowed?
Uh and then I also have a question about
[47:05]
fencing. Um I don't see much about
fencing. It just says it'll be used
[47:09]
where required to uh let me see here. To
avoid disrupting like the nature around
[47:17]
is basically what I'm understanding.
Um
[47:21]
» those are both good questions. I will
have staff respond to those.
[47:25]
» Okay.
So, um they will be required to get a
[47:29]
grading permit from public works and
they will address any kind of um dust
[47:33]
control. Um they'll also be required to
have a pre-construction meeting before
[47:37]
they begin construction and they'll also
address that and mitigation. I know our
[47:42]
public works department keeps a close
eye on development and um especially if
[47:47]
any complaints are made by um
neighborhoods to um to address those
[47:53]
with the developers. Um, as far as
fences go, we don't require uh permits
[47:58]
for fences, and that's more of a a civil
matter. Um,
[48:03]
so I think that's separate.
>> Yes. And I believe in prior um
[48:08]
subdivisions that we have come through
here, fencing is not usually a required
[48:12]
element unless it is in a zone that
requires fencing for commercial
[48:18]
property, storage facilities, that type
of thing. Um, so most of the time people
[48:24]
like in the new subdevelopment by LAS,
people are choosing to build fences, but
[48:29]
that's not something that the city can
necessarily require um from a um
[48:35]
standard. Um,
is that correct?
[48:40]
» Yeah, that's true. So usually you use f
fences will be required as like a
[48:44]
transitional element between um
conflicting zones or zones uh
[48:49]
particularly like a commercial to
residential just to mitigate any of the
[48:54]
impacts that come from headlight glare
that sort of thing. Residential there's
[48:58]
there's usually there's no standard
attached defenses as part of a a
[49:02]
transitional element to kind of pro
provide a division between the
[49:07]
properties. So you wouldn't see that in
residential, nor there's is there a
[49:10]
requirement in the code for it.
>> Is there a a requirement for fencing
[49:16]
where there's a street
[49:20]
» where the house butts up against the
street or or is it the responsibility of
[49:24]
each individual owner?
>> I would that would be the responsibility
[49:30]
for each individual owner. Um I mean
typically where where codes are going
[49:34]
they're trying to eliminate fences
because they create a canyoning effect
[49:37]
right along the roadway. So you know a
lot of times we're going to you know if
[49:42]
you can front uh houses and that sort of
thing on streets it gives a different
[49:46]
character. So there is no requirement to
build uh you know a fence to delineate
[49:53]
the backyards from the road
>> from the road.
[49:56]
» Right. But the developer does have the
option uh to build those
[50:01]
» out of courtesy. They can build the
fence. They could
[50:04]
» that goes along the roadway.
>> I mean you have
[50:09]
yards
and children
[50:12]
» typically. I mean what you'll see from
developers is some sort of continuity.
[50:16]
So they'll build the fence all along
there uh along a busy road uh versus
[50:21]
just getting kind of a hodgepodge of
fences being built by individual owners.
[50:25]
So, um I don't know if they've
contemplated if they're going to add
[50:29]
that feature to the subdivision or not,
but it is an option that they would
[50:31]
have,
>> but it's only volunteer. It's
[50:35]
voluntarily
>> correct.
[50:37]
» Done. Okay.
[50:42]
» Okay. Thank you. I appreciate it.
>> Did that answer your question, Jerome?
[50:45]
» Yes.
>> Okay. Thank you.
[50:47]
» All right. Do we have any testimony in
opposition?
[50:54]
Anything online?
[50:59]
Okay. So, would the applicant like to
respond to anything that has been
[51:02]
discussed?
[51:07]
Okay. Applicant says they're good. All
right. Um, let's see. We will or
[51:15]
actually staff, do you have anything
that you'd like to provide? All right.
[51:19]
commission. We now have those three
options again where we can close the
[51:22]
hearing and deliberate or we can close
the hearing and defer deliberation to a
[51:27]
date and time certain or we can continue
the public hearing to a time and date
[51:32]
certain. How does the commission wish to
proceed?
[51:36]
This is Commissioner Eder and I would
like to close the public hearing and um
[51:42]
deliberate on a decision.
[51:47]
Commissioner Kendall, I second the
motion.
[51:49]
» All right, I have a first and a second.
All those in favor say I. I.
[51:53]
» I. I. All right. Motion carries.
All right. Anything to add here or
[52:00]
questions to staff? I think it goes
right with uh what we did with the uh
[52:05]
master plan.
[52:10]
» Okay.
Then the next step would be to submit
[52:15]
either a motion to approve or
this is commissioner and I approve the
[52:25]
the SD25-1
mule deer estates subdivision
[52:29]
application.
Um
[52:36]
I I can second that.
Do a first and a second.
[52:42]
Any discussion? Okay. All those in favor
say I.
[52:46]
» I.
>> I. I..................... All right.
[52:48]
Motion carries.
All right. Thank you. Thank you for
[52:52]
attending. Um we now will move on to any
other items that staff would like to
[52:58]
comment or talk about our next meeting.
Um our next meeting is scheduled for
[53:03]
September 3rd, but we don't currently
have any items for that agenda. So, I'll
[53:07]
reach out to you guys as it gets closer
and see if we either um cancel it or and
[53:12]
see your attendance as well. Okay.
>> Yeah. Thank you. Thank you everyone for
[53:18]
attending this evening. We will adjourn
the meeting at 73 or 7:27.