Agenda
[0:25]
Adoption of the Agenda
[0:25]
Agenda
[1:10]
General Matters
[1:10]
Art at Council
[6:35]
Adoption of Minutes
[6:35]
Minutes
[6:45]
Consent Agenda
[6:45]
Adoption of ACC Bylaw No. 3551 and DCC Reduction Bylaw No. 3550
[7:30]
Adoption of Development Cost Charges Expenditure Bylaw No. 3555 – Parkland Acquisition
[6:45]
Adoption of Council Procedure Bylaw Amendment and Updated Council Motions Policy
[6:45]
Major Civic Facilities Roadmap - Approval
[6:45]
Inlet Theatre - Piano Storage
[6:45]
Kyle Centre Redevelopment Round 2 Public Engagement Summary
[6:45]
Notification of Metro 2050 Land Use Designation Amendment Request - City of Surrey (105 - 175A Street)
[7:50]
Updates on Park Use Promotion and Enhancement
[27:30]
Development Permit Issuance (DP000107) - Beedie Moody Centre TOD (Beedie Living)
[6:45]
Proposed Culvert – 860-864 Alderside Road
[36:10]
Development Variance Permit - 205 Mount Royal Drive (Shazan Developments Inc.)
[58:10]
Heritage Alteration Permit -- 101 First Avenue (School District 43)
[1:08:30]
Kyle Centre Redevelopment Project Update and Request for Additional Capital
[1:58:00]
Suter Brook Traffic Improvements Plan Update Request
[2:11:30]
Committee Appointments
[2:12:10]
Verbal Reports from Council and Staff
[2:12:10]
Council Verbal Reports
Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
The times in this transcript were moved to match the video, using the meeting's own audio. The text is the source's captions, unchanged; the source times are kept in the "sourced" version.
[0:00]
Okay, it's seven o'clock. We're going to call this meeting
[0:02]
to order. Welcome everybody. We'll start off in a good
[0:06]
way with the territorial land acknowledgement. The city of Port
[0:10]
Moody carries out our business on the ancestral and unseated
[0:13]
homelands of the Quakewitlam, Slail with Tooth, Musquim, Squamish, Katzy,
[0:18]
Kwantlun, Kikate, and Stolo Peoples and extends appreciation for the
[0:21]
opportunity to work on this territory. Next time is adoption
[0:26]
of the agenda. And I will move that the agenda,
[0:32]
the adopted as circulated with the following amendments. We have
[0:35]
a couple of typos, and the one item to add.
[0:39]
Replacing the memo for item 7. 1 adoption of ACC
[0:43]
bylaw and DCC bylaw, number 3550 with the memo is
[0:47]
provided in the on - table package. That's due to
[0:49]
a typo, replacing the memo for 1. 1. 2 heritage
[0:53]
alteration permit, 101 first Avenue with MMO as provided in
[0:57]
the on - table package. Same reason. And then the
[0:59]
addition of 11. 5, which is federal rail safety improvement
[1:02]
program grant intake. So that's been moved. Is there a
[1:06]
seconder? All in favor. Posed, carried. Thank you. Okay, we'll
[1:14]
move on to art at Council, and I will provide
[1:17]
Councillor Knowles with the chair for a moment. Go ahead.
[1:23]
Thank you so much, Mayor. Tonight we are pleased to
[1:26]
welcome Jenna Wynd, a third year visual art student at
[1:29]
Emily Carr University. Jenna is the recipient of the 2026
[1:35]
CREAM Choice Scholarship at Pomo Arts. Her artistic practice includes
[1:37]
Ink drawing and middle sculpture, while intricate line drawings were
[1:40]
once her primary focus, her work has recently evolved as
[1:43]
she learns to draw with steel. Tonight we are delighted
[1:47]
to present Labyrinthine, a sculpture made from welded steel rods.
[1:51]
Jenna describes her sculptural process as fierce physically demanding and
[1:55]
often intense, stark contrast to the intimate and quiet act
[1:58]
of drawing. Labyrinthin, you will have to tell me if
[2:01]
I'm mispronouncing that when you come up. As part of
[2:04]
a larger body of work that explores the workaround her
[2:06]
and responds to dominant narratives of war, discrimination, uncertainty and
[2:10]
imbalance. Themes that have become increasingly present in our everyday
[2:13]
lives. Additional works by Jenna can be viewed at Pomo
[2:17]
Arts as part of her solo exhibition Laguna on display
[2:20]
until August 30th. Please join me in welcoming Jenna. We
[2:24]
look forward to hearing more about your artistic practice. Hi
[2:29]
Jenna, welcome. I also wanted to say before you begin,
[2:32]
I've seen your exhibition. I've been to Pomar at a
[2:34]
couple times. I took my daughter on the weekend and
[2:36]
I really thought it was very thought - provoking. I
[2:39]
really love the wax one in particular. Oh great, thank
[2:42]
you so much. Welcome. Hi, good evening. Thank you so
[2:45]
much for having me. It's actually really nice feedback in
[2:48]
Port Moody. I was actually born here. So it's nice
[2:50]
to be coming back and forth. Welcome home. Artwork here.
[2:54]
My practice involves expressing myself through sculpture and detailed ink
[2:58]
and graphite drawings, working in sculpture is a fairly new
[3:01]
practice for me. Within the last year, I've learned all
[3:04]
of my techniques in metalworking. Previously all of my work
[3:08]
had just been revolved around line drawing. But more recently
[3:11]
I'm learning to take that drawing style and apply it
[3:13]
to steel to make something a lot more fluid through
[3:15]
something so rigid and very difficult to work with. My
[3:20]
methodology within working with metal is it's often quite, it's
[3:24]
very strenuous, very fierce and very loud. It's a very
[3:27]
demanding process and this is a really interesting contrast to
[3:31]
my drawing, which is very quiet and very intimate. So
[3:33]
these two processes inform each other and they kind of,
[3:36]
I explore the two rigors between the disparate connections between
[3:39]
these two to similar practices. Um, and the work today
[3:42]
I brought is called Labyrinthine. It's a steel sculpture that
[3:45]
I welded, formed, and very heavily grinded. Uh, the piece
[3:48]
was a starting point for the collection of work that
[3:50]
I'm currently presenting at home or art centre. Um, the
[3:54]
body work is titled La Kuna and this refers to
[3:56]
the spaces in between or a gap or a missing
[3:58]
piece. Um, the resulting works in this collection reflect abro
[4:02]
and unfiltered interpretation of my understanding of the world, embracing
[4:06]
its cultural. I'm sorry, it's critical flaws, influences and complexities.
[4:11]
Uh, this body of work is my attempt to understand
[4:13]
the outer world around me, the dominant narratives of a
[4:15]
war, discrimination, uncertainty, and imbalance that has become a consistent
[4:19]
theme to contend with an everyday life. Uh, this emotive
[4:23]
burden feeds into the tension that I explore within my
[4:26]
work and drives the energy that I use to create
[4:28]
within my practice. Um, I work as best understood through
[4:32]
your own exploration. And this is a direct line into
[4:35]
my method of thinking. Uh, my newest body work combined
[4:38]
steel blown glass and wax. And you can see a
[4:40]
little bit of this at pomerart centre. And hopefully I'll
[4:43]
have more to come. Uh, the exhibitions on until the
[4:45]
30th. And thank you so much for your time. Thank
[4:48]
you so much. Any other comments from council? I see
[4:52]
Councillor Dilworth has. Just absolutely gorgeous. How long did it
[4:58]
take you from the time you first started thinking about
[5:03]
this idea until it was completed? This one took about,
[5:07]
I think, 50 hours of work. Okay. Um, yes. Wow.
[5:11]
And people may not see from the audience, but it's
[5:14]
just got this intricate texturing throughout. Is it meant to
[5:18]
be touched at all? Cause I'm a tactile person. I
[5:21]
was going to touch it. My time. I better not.
[5:22]
You're welcome to touch it. It is, um, it's, it's
[5:24]
all of it. It's built up weld. So it's, it's
[5:27]
done with hours of taking a welding gun and essentially
[5:30]
drawing the material onto it. Quite a few hours of
[5:33]
just grinding and finishing that material off. So it kind
[5:36]
of resembles tree bark or a little bit of like
[5:38]
intricate, um, I guess like cell structures as well through
[5:41]
the process. Yeah. It's gorgeous. And that's a very cool
[5:45]
explanation of that texturing. Thank you. Thank you. Thank you
[5:50]
very much for being here. It's absolutely beautiful. Peace as
[5:54]
Councillor Dilworth stated. And I'm so happy to have you
[5:56]
here. And welcome home. Thank you so much. You're welcome.
[5:59]
Thank you for coming. Thank you. All right. So, uh,
[6:07]
the next item is, do I need to read this
[6:13]
statement? Uh, we're here. Yes. Yeah. Okay. Uh, would have
[6:14]
been public, but it's public input, but that has been
[6:18]
pause. To comply with provincial legislation on election advertising. There
[6:21]
will be no, no, no, input agenda item at Council
[6:27]
meetings conducted between July 20th and October 17th during this
[6:31]
time the public is welcome to email counsel at Council
[6:34]
at Portmoody. ca. We'll move to adoption of the minutes.
[6:38]
Uh, so that is July 7th, July 14th. Moved. Is
[6:43]
there a seconded all in favor. Opposed carried. Thank you.
[6:47]
Which brings us to the consent agenda. Councillor Lurbecki. I'd
[6:55]
like to pull 7. 2 adoption development cost charge expenditure
[6:59]
by Laufra Parkland Acquisition and 7. 9 development permit for
[7:04]
BD centre TOD. Okay. Thank you. Um, hang on. Let's
[7:07]
let me put that down. All right. Councillor Knolls. Uh,
[7:11]
7. 8 please. 7. 8. Okay. And we'll go. Is
[7:17]
there somebody else. Had, okay. Okay. That's great. Uh, Councillor
[7:24]
Dilworth is moving the rest as a block. It's been
[7:26]
seconded. Um, all in favor. Opposed carried. Thank you very
[7:31]
much. So we will go to 7. 2 councillor Lurbecki.
[7:36]
Uh, thank you. I just wanted to pull this because
[7:37]
I'll be voting against. Do you want to move somebody
[7:41]
want to move the motion? It's been moved in seconded.
[7:44]
Um, any conversation. Nope. I'll call the question then all
[7:47]
in favor. Opposed Councillor Larbecchi as opposed. We'll go to
[7:51]
Councillor Knowles item, which is item 7. 8. Thank you
[7:59]
so much. Um, so at our January 13th, 2026 meeting
[8:05]
and in response to Council's decision to build a temporary
[8:08]
basketball court at the old fire hell lens. We had
[8:10]
a speaker come forward at public input that night to
[8:13]
express this disappointment that there's been little action or progress
[8:16]
made on the recommendations of two previous parks in rec
[8:20]
slash environment subcommittee reports struck in 2019 and 2022. Um,
[8:25]
those subcommittees conducted significant in - depth studies into the
[8:28]
state of our neighbourhood and community parks. And I remember
[8:31]
very clearly the report from July 22 because that was
[8:34]
a member of the Parks and Rec Commission at the
[8:37]
time it was called, actually as was Councillor Lebecky. And
[8:41]
we heard the report firsthand and its recommendations. And that
[8:46]
report was then referred to Council at an meeting that
[8:51]
shortly followed and asked to consider. Um, as a result
[8:55]
of the speaker at that January 13th meeting, Councillor Lubick
[8:58]
moved that staff report on progress and upcoming initiatives on
[9:01]
neighbourhood park use promotion and enhancement, which was greatly appreciated.
[9:07]
Um, as of the writing of the 22, 2022 report,
[9:10]
there were 16 parks in Port Moted classified as neighbourhood.
[9:13]
This included three newer parks and one newer park that
[9:16]
had been classified as neighbourhood, but was reclassified as natural
[9:20]
for net inventory change of two since the 2015 report.
[9:25]
And as a result of that motion made January 23rd
[9:31]
to 13, January 13th, we have that report from staff
[9:33]
tonight. And that is 7. 8 in the item. Here
[9:35]
that I've pulled. Now the report has a lot of
[9:39]
great information. And while I appreciate the mini updates that
[9:42]
provide, I think some members of both council and the
[9:44]
public were disappointed at the lack of focus on, um,
[9:46]
neighbourhood and community parks. That it contains. The specific motion,
[9:54]
again, was report back on progress and upcoming initish on
[10:02]
neighbourhood park use promotion and enhancement. The current report blends
[10:06]
in trails larger city community parks like Aspenwood, North Shore,
[10:09]
old orchard, rocky point, West Hill, et cetera. I think
[10:14]
what we were looking for was perhaps a dedicated inventory
[10:17]
of the 13 specific neighbourhood parks. And whether any have
[10:21]
been added, removed, we classified, et cetera. Not yet inventoried.
[10:26]
And I believe there are several. So with all that
[10:29]
said, and I will look to the clerk for assistance
[10:33]
here. I don't know if I want to oppose the
[10:34]
recommendation here tonight, which is that this B receiver information.
[10:37]
Because I would like to move instead that we redirect
[10:39]
staff to rewrite this report and focus its neighbourhood on
[10:45]
neighbourhood and community parks on a more wholesome basis with
[10:48]
consideration of capacity, use, future needs, the needs of seniors
[10:52]
and other demographic shifts of the residents, living near these
[10:56]
neighbourhood sites or not, as the case may be the
[10:58]
2022, um, report identified at least three areas of Port
[11:02]
Moody that are not serviced by any community or neighbourhood
[11:04]
parks. And we believe that the oversight and other pertinent
[11:09]
matters as appropriate. So, um, assuming that this fails, the
[11:14]
motion, we can receive this, then we cannot give further
[11:17]
direction. Okay. So my motion then would be that we,
[11:23]
um, direct staff, um, let's, let's receive this for information.
[11:26]
That what's being presented and further direct staff. Okay. That's
[11:30]
fine. So that's fine. I will move that we receive
[11:32]
this and then would it be a motion rising mayor.
[11:34]
Yep. Okay. So let's - And I'll do that. Let's
[11:37]
receive. Um, it's been seconded all in favor. Opposed carried.
[11:40]
Now Councillor, you have a motion arising? Yes. Um, but
[11:44]
if I may just continue a little bit, have you
[11:47]
provided your motion to staff? I have not. I am
[11:49]
just a little bit winging it. I'm kind of winging
[11:52]
it here. Thank you. That's okay. Um, yes. And you
[11:55]
know, I wanted to mention as well, like in 2025,
[11:57]
we had charted a path forward with a trail network
[11:59]
plan 30 year trail network plan. And it's, it's a
[12:01]
great piece of work. Um, staff of denigrate job on
[12:04]
that and on our larger master plans, um, but I,
[12:08]
I, I don't think I'm alone in wishing that there
[12:11]
was, there were more of a focus on neighbourhood parks.
[12:14]
And those that we visit on a regular basis, we
[12:17]
want residents to have access to parks within walking distance.
[12:22]
And that is, as we grow and as generally the
[12:26]
population increases, it becomes more and more important. And thanks
[12:31]
Mr. Grassy for sending the Senate a senior's focus committee
[12:33]
presentation in the spring. He mentioned that, um, our seniors
[12:36]
population is going to more than double by 2039. Yeah,
[12:40]
I think Councillor Dilworth is the chair of that committee.
[12:44]
And, you know, there are policies in place to prioritize
[12:46]
supporting seniors age. Renting out of your time limit. So
[12:50]
could you please present your motion? Okay. Thanks. You get
[12:54]
the gist. Yeah, we get the gist. Okay. Um, I'm
[12:56]
going to move that we, that stuff, um, return with
[12:59]
a report specifically on neighbourhood and community parks with consideration
[13:05]
of capacity, comma, use, comma, future needs, comma, the needs
[13:11]
of seniors and other demographic shifts of the residents, living
[13:15]
near neighbourhood and community parks. And I, um, we'll send
[13:19]
that to the spin seconded. Um, clerk, um, Madam Clerk,
[13:24]
do you have that? I'm going to send it to
[13:26]
her right now. Okay. That's great. Thank you so much.
[13:29]
Thank you. Okay. So that's been moved and seconded. Thank
[13:33]
you for that councillor. I will move on to Councillor
[13:37]
Lubeck. Thank you so much. Um, no, I'm really glad
[13:39]
that we're having this conversation. Sorry Councillor Morrison. You can
[13:41]
bring back in. Go ahead Councillor. Sorry. Thank you. Um,
[13:46]
I'm very glad we're having this conversation. I want to
[13:48]
give, um, a lot of credit and kudos to staff
[13:51]
for the work that has been done. Like it's an
[13:53]
incredible amount of work. Um, I think we're hoping in
[13:58]
addition to that to be looking at the neighbourhood park.
[14:00]
So I do want to say like what an incredible
[14:01]
job staff have been doing. I think in addition to
[14:06]
this, um, what has been shared. And I'll see if
[14:09]
I have an amendment, but hopefully it'll be a friendly
[14:12]
one. In that, you know, I think one of the
[14:18]
things that's important is that neighbourhood parks are very specific.
[14:24]
To those populations. And obviously neighbourhoods grow and evolve. But
[14:28]
I'm wondering what our opportunities would be for more neighbourhood
[14:33]
consultation on what is needed for updating some of those
[14:37]
neighbourhood parks. Like maybe the opportunity for co - creation.
[14:39]
With some of the neighbourhoods or even community groups. Oh,
[14:45]
I think a good place to start is to get
[14:48]
this information that the Councillor is asking for. Perhaps maybe
[14:53]
there, we can further delve into how we address the
[14:56]
needs that get better rise. I think so. I think
[15:00]
I'd also like to hear, and I'll think about it,
[15:02]
perhaps it's not needed. Just what are some of our
[15:05]
opportunities for neighbourhood engagement. Should it be needed? Okay. That's
[15:10]
a good point, Councillor. Thank you for that. Um, we're
[15:15]
just waiting for staff to get that up. But is
[15:17]
that everything? Uh, yes, thank you. Thank you. Um, Councillor
[15:24]
Dilworth. Thank you. I'm not going to repeat what Councillor
[15:26]
Knowles said, but I wanted to, first of all, acknowledge
[15:28]
the tremendous work that our staff have been doing in
[15:31]
terms of enhancing and looking at maximizing park usage in
[15:38]
smaller parts throughout the entire community. Uh, I look to
[15:42]
the tremendous evolution of West Hill Park. I know we've
[15:46]
been doing pop - up parks that have really, really
[15:48]
worked. But I don't think that we're fully planning or
[15:53]
utilising for those parks, um, like Apple Yard, like Foxwood,
[15:59]
even like Flavello. Um. And I think there's an opportunity
[16:03]
to do some engagement in those communities and find out
[16:07]
what we need. And this is, this is not, um,
[16:10]
a criticism of staff at all. It's just that this
[16:13]
council has made it a very high level strategic priority
[16:16]
to look at the assets that we have. And look
[16:19]
how we can better them for the use of the
[16:22]
neighbourhoods that they're in. So I do really appreciate the
[16:25]
information we got now, but I think as a council
[16:27]
to move forward strategically, we need to drill down a
[16:31]
little bit more on those park assets that we have
[16:34]
throughout the community. So I will be supporting the motion.
[16:37]
Thank you. Thank you so much Councillor. Councillor Agtrapp. Uh,
[16:41]
thank you. And I won't repeat what has already been
[16:44]
said. I just had a question through the staff about
[16:46]
the definition, um, between neighbourhood and community parks. I know
[16:50]
we have one park named North Shore community park, but
[16:53]
we seem to, I just wanted to get clarity on
[16:55]
what we define as neighbourhood versus community. So we go
[17:00]
to the manager of the community services. Okay. Yep. Go
[17:10]
ahead. Aaron's there. Yep. So my good, okay. Thanks. Um,
[17:15]
yeah, through the chair, we have updated the classification system
[17:18]
as part of the Parkland strategy that came to Council
[17:21]
last year. So we are now simplifying the terminology in
[17:25]
terms of active Parkland and natural parkland. And part of
[17:31]
the thinking behind that was we do have destination parks
[17:35]
in the system, but they also serve as neighbourhood and
[17:38]
community parks. It's all in relation to, um, the use
[17:41]
and access and, you know, as mentioned, proximity. For those
[17:45]
that are there, uh, in that community. And the amenities
[17:49]
that are within those parks serve those purposes for those,
[17:52]
um, populations. So we focused more on access in terms
[17:55]
of how much, how far people had to walk to
[17:59]
Access Parkland and looked at gaps and filling those needs
[18:04]
based on space and amenities. With that lens as opposed
[18:08]
to getting too focused on the categories, which wasn't, wasn't
[18:14]
sort of serving us in trying to evaluate need and
[18:17]
gaps. Okay. Okay. I appreciate that. So basically what I'm
[18:21]
hearing the neighbourhood and community, there is no difference. It's
[18:23]
just really, um, we're talking about whether it's active or
[18:27]
natural and how it's managed. Um, what's the goal of
[18:30]
ensuring that all the parks are with every household has,
[18:34]
I think a 400 metre or five minute walk to
[18:37]
a park. That's a, that's a focus. We again looked
[18:39]
at the way people access Park. So again, understanding what
[18:43]
it takes to walk, whether you're crossing major roads or
[18:46]
overpasses or, you know, what is between you and that
[18:49]
part. So that was the focus. And again, the amenities
[18:52]
and the distribution. Okay. Thank you. Thank you. Councillor Morrison.
[18:57]
Thank you. And I appreciate my colleague discussion on this
[19:00]
item. And I do appreciate the report that we received
[19:02]
as far as, uh, really highlighting some of the things
[19:05]
that have been done in regards to, um, outdoor spaces,
[19:08]
whether it be basketball courts or the activation of the
[19:10]
pop - up barks. Um, especially the Kyle Centre one,
[19:13]
which has been very, very well received over the last
[19:15]
few years that I've seen with the mini golf and
[19:18]
all that happening there. So I do want to give
[19:20]
credit for the activation of spaces that have been just
[19:23]
grass, for example, and the ability to do more activities
[19:26]
on there. But I also appreciate the fact that since
[19:29]
it has been such a huge priority for us to
[19:31]
find ways to activate and keep these spaces as really
[19:34]
community gathering spaces within these neighbourhoods to help relieve pressure
[19:39]
on some of those other parks and playgrounds specifically, um,
[19:43]
like Rocky Point Park playground or West Hill Park playground.
[19:47]
There's only a few playgrounds of that larger size nature
[19:51]
in the community. I think that we do need to
[19:54]
look at how and where and what plan timeline we're
[19:57]
going to be doing certain upgrades and certain neighbourhoods prioritizing
[20:00]
them, create a roadmap. And then also talk with the
[20:04]
community about what play structures they want to see when
[20:07]
we talk about playground specifically. Um, as opposed to just
[20:11]
perhaps a consultants report on what it might be local
[20:14]
neighbourhoods might and parents might have a big input on
[20:16]
what they want to see. They'll know their kids and
[20:18]
what they want to play with. And kids will know
[20:20]
what they want to play with as well. And I
[20:21]
think we can really dive in a little deeper on
[20:24]
those particular things in those neighbourhood parks. So, um, I
[20:27]
am supportive of this motion to get more information. And
[20:30]
I look forward to the discussion whether it happens to
[20:32]
be before this term is up or into the next
[20:34]
term on prioritizing those neighbourhood parks to relieve pressure from
[20:37]
the big ones as well as make it a little
[20:39]
more enjoyable for people to stay close to home in
[20:41]
their own neighbourhoods. Thank you. Thank you, Councillor Councillor Lurbecki.
[20:45]
Thank you. So, um, my understanding is Council already gay
[20:50]
direction. We received a report back. And what I'm hearing
[20:52]
at the table here is that the desire for additional
[20:54]
information from what we received back. So, so now I'm
[20:58]
looking at this motion and I'm trying to understand what
[21:00]
we're going to get back. Um, and maybe this is
[21:04]
a question through the staff. If this is clear enough,
[21:07]
so I understand, you know, that focuses on neighbourhood and
[21:11]
community parks with consideration of capacity use future needs proxy
[21:14]
me to homes. And it goes on. But I think
[21:17]
what's missing from this motion is like, what is the
[21:20]
goal or the vision or the lens through which we
[21:23]
are directing staffed undertake this work? I know we've our
[21:26]
parkland strategy, but I'm just a bit worried that this
[21:29]
is so broad. I'm not sure what we're going to
[21:32]
get back and how we'll make sure that's meeting our
[21:34]
needs as well. Again, if we want to layering community
[21:36]
engagement on that, I thought could be the missing piece
[21:39]
here in terms of understanding what those needs are at
[21:42]
those community parks. I'm not so sure that this will
[21:46]
necessarily give the information that council is seeking if that's
[21:51]
what I'm hearing. So through the staff, could you comment
[21:54]
on if this is clear, if additional direction around, um,
[22:00]
undertaking engagement that the neighbourhood level around parks, do we
[22:03]
already have a really good idea of all of these
[22:05]
tiny little neighbourhood parks that we have and how we're
[22:07]
going to activate them. We just haven't written it down
[22:09]
yet. Just through to staff, I want to make sure
[22:11]
that the directions crystal clear. So, you know, we're not
[22:14]
kind of back here again. So the question is with
[22:19]
this direction, do you have a clear idea of what
[22:22]
the motion is asking for. I would say we could
[22:27]
use a little, a little more clarity perhaps, but I
[22:30]
think that we could, um, start the process with what
[22:33]
we presented as part of the Parkland strategy, which sort
[22:36]
of mapped out each neighbourhood and what those existing amenities
[22:40]
are as a starting point, uh, collate that with, um,
[22:43]
engagement that we've done connected to a number of different
[22:47]
strategies, including recreation facilities work as well as, you know,
[22:50]
trails and other things. And bring back a bit of
[22:54]
a picture in terms of where we're seeing our gaps,
[22:57]
um, and what we've heard back to date and maybe
[23:00]
outline with. I think that's what the Councillors are. Future
[23:02]
work should focus. So. I think what we'll get back
[23:08]
here, I think this is going to be a multi
[23:10]
- stage, multi - step conversation is what I think
[23:13]
was missing from this motion is a descriptor such as
[23:17]
to activate or to blank. Um, this is information we
[23:21]
can get back, but it's really missing the direction of
[23:24]
Council in terms of what is our goal. If our
[23:26]
goal is to activate these spaces, is it to make
[23:29]
them for, for children, for seniors, or are we still
[23:32]
asking, I guess, to figure that out to begin with.
[23:34]
I think this is multi - layered. So I just
[23:36]
wanted to point that out that this is very broad.
[23:40]
So that's what they're working. You're right. It is going
[23:43]
to be multi - staged because once we get that
[23:46]
information, then we'll have to give further direction. But I
[23:48]
think the city manager, um, wants to add in. Yeah.
[23:52]
Thank you. Provide a comment. Thank you Mayor. I was
[23:54]
just going to note, um, as Ms. Embley said, I
[23:57]
think this is clear direction for staff. I did want
[24:01]
to flag that, um, the needs of seniors and demographic
[24:03]
shifts of the residents living near neighbourhood sites. That could
[24:07]
be quite a bit of analysis and data collection. So
[24:10]
I think our next touch point would be, because this
[24:13]
is new work. It would go on to the intake
[24:15]
list. We would come back with a report that may
[24:18]
be in September it might be after. And then we'd
[24:20]
start mapping out the layers that you're speaking to. And
[24:23]
then we can also get a touch point with Council
[24:25]
if that's on the right track is that the desired
[24:27]
outcome. Okay. Thank you for that. I just want to
[24:30]
point out that, you know, I appreciate this report. And
[24:33]
I think given the direction that's been given, it's meeting,
[24:35]
you know, the initial level of needs. And then we're
[24:37]
continuing on this conversation, recognising that I do think the
[24:41]
ASCAR is very broad. So it's going to be narrowed
[24:43]
in scope as it keeps coming back to council unless
[24:45]
something that I'm comfortable with to get to the root
[24:49]
of what we're trying to achieve. So thank you. Thank
[24:51]
you. Yeah. I agree with that. Um, Councillor, Councillor Knowles,
[24:56]
you've already spoken Councillor Agrac, have you spoken to this
[25:00]
item? Yeah. Okay. Go ahead, Councillor Noels. Yeah. I just
[25:03]
wanted to kind of respond to that because I mean,
[25:09]
Councillor Libec is right. I think, um, from my perspective,
[25:11]
and this is just a general direction to staff. You
[25:14]
know, that 2022 report pointed out two underserved areas. And
[25:18]
I think I've been wondering since that report, are those
[25:22]
neighbourhoods actually underserved? So like an answer to those questions
[25:24]
would be great. But the other, um, public engagement, I
[25:28]
think it would be great for people in, if we
[25:31]
could fold an opportunity for public engagement into, um, this
[25:36]
neighbourhood work, because I would love to know which people
[25:38]
feel like they don't have a neighbourhood park nearby. I
[25:41]
think staff, when they come back with their, uh, project
[25:45]
sort of proposal that will be, uh, that should be
[25:49]
included in there. Those types of, um, opportunities. Thank you.
[25:55]
Councillor Ag Toro. Thank you. I was just going to
[25:56]
add that. I think this is, is kind of like
[25:58]
a gap analysis taking the work that we've already done.
[26:01]
And, you know, recognising that there has been significant work
[26:05]
done on the parkland strategy. There's also, um, I think
[26:08]
others mentioned some other reports that have been done. And
[26:11]
it's really bringing that all together in one sort of,
[26:15]
um, like merging that all and delivering it in an
[26:18]
informational packet that is more, um, easily accessible. And so
[26:23]
that we can really get down to, are there gap?
[26:26]
Yeah. Yeah. Are there gaps existing and what, what decisions
[26:29]
does Council need to make to fill those gaps? Yeah.
[26:32]
Thank you. Thank you. City manager is going to wrap
[26:34]
this one up. Thank you Mayor. I was just going
[26:36]
to note it would help staff. And I think for
[26:38]
clarity in the motion arising, if I'm able to suggest
[26:41]
that just picking up on Councillor Lubick's comments and the
[26:44]
Council Dialogue, if it actually also said and explore opportunities
[26:48]
for neighbourhood engagement, okay. Yeah. Um, would that be okay
[26:52]
if we add that in? I'll move that, um, amendment.
[26:58]
I'll call the question on that all in favor. I'll
[27:01]
just carry it. So we're incorporating that right into it
[27:02]
so that that comes back with those opportunities. Yeah. Thank
[27:05]
you again. I think that that's been made very clear
[27:08]
tonight that Council really appreciated the work that was done
[27:12]
to date on this. And we're, we're just wanting to
[27:14]
further delve into that, uh, into those neighbourhood parks and
[27:19]
figure out exactly where we need to make improvements and
[27:22]
where the gaps are. So thank you. Um, I'll call
[27:25]
the question on the amended motion all in favor. Opposed
[27:28]
carried unanimously. Thank you so much, which brings us to
[27:31]
item 7. 9, which is Councillor Lerbecky. Oh, I'm
[27:40]
sorry. Go ahead. There we go. Um, so I pulled
[27:43]
this pillar will not be supporting this. This is the
[27:45]
development permit for BD development in Moody Centre, which is
[27:49]
three towers up to 38 stories. Part of the 14
[27:52]
tower plan framework call it what you will for the
[27:55]
area. Um, reaching up to 40 stories. I am speaking
[27:59]
to so many people in the community every single day
[28:01]
and trying to find, um, majority support for the plan
[28:05]
and moody centre is very, I'm not, I'm not finding
[28:09]
it. So I can't be sporting this. I know that,
[28:12]
you know, by the time we're getting to development permit,
[28:15]
it seems like it's far down the road. I do
[28:17]
have concern when we put something like this on consent,
[28:20]
uh, this is still the largest tallest, most dense tower
[28:25]
development in that area that we've seen. And it's on
[28:27]
consent. I would have liked to actually seen it again
[28:30]
and talked about it again. Um, I don't think that
[28:35]
that's the right future for our city. And that's why
[28:38]
I've pulled it. And I will not be supporting this
[28:41]
tonight. Thank you. Thank you, Councillor. Councillor Dilworth. Do you
[28:44]
know what I can see why some people might be
[28:46]
confused about this being on the consent agenda, but I
[28:50]
could through the staff get an explanation of exactly what
[28:53]
this is because this is not final development permit. Go
[28:57]
put shovels and ground at all. So if we can,
[29:00]
I guess back through to Ms. Smith clarify exactly what
[29:03]
this motion is. Oh, I see Mr. Wu coming up.
[29:06]
Oh, okay. Go ahead, Mr. Wu. Yeah.
[29:16]
Excuse me. Through the chair, this is a development permit
[29:19]
for, um, B's development project in Moody Centre. And to
[29:23]
answer the Councillor's question, it allows the developer to go
[29:29]
forward with their project, uh, to the next stage, which
[29:31]
would be to apply for a building permit and building
[29:35]
permit for, um, foundation work and above groundworks. Great. Thank
[29:40]
you. I was wondering people to know that this wasn't
[29:42]
the final approval. Thank you. Councillor Lubick. Thank you so
[29:48]
much. Uh, actually just had a couple of questions. So
[29:52]
it was handy. Um, one of the questions that I
[29:53]
had was, you know, I appreciated that the geotechnical report
[29:57]
was very long and detailed. Um, and so I just
[30:01]
wondered, um, you know, I know they're concerned sometimes around,
[30:05]
um, you know, soil stability and things like that. So
[30:08]
I was wondering if staff could just briefly touch on
[30:11]
some of the, um, requirements for mitigation of that, um,
[30:15]
also what our monitoring looks like during the construction process,
[30:18]
whenever that happens. Through staff. Go ahead. Yeah. Through the
[30:24]
chair, the development permit, we have, um, we have a
[30:28]
development one is reform and character. So that allows, you
[30:30]
know, development of the three buildings. And as the Councillor
[30:33]
mentioned another development permit for hazardous land. So this is
[30:35]
due to the potential of so liquefaction similar to much
[30:38]
of the soils in Moody Centre, uh, it's not great.
[30:42]
Um, but, you know, with through like mitigations, um, measures
[30:46]
the land can be used safely and build safely on.
[30:51]
In this case, the city is in receipt of a
[30:53]
geotechnical report, which is also attached to the development permit.
[30:56]
A number of recommendations were made by the geotechnical engineer
[30:59]
on record regarding site preparation, groundwater cutoff, building foundation, slap
[31:05]
on grade floors, site and foundation drainage systems and seismic
[31:08]
design. So prior to construction, the engineer on record, um,
[31:15]
the engineer would also be required to install the monitoring
[31:18]
systems throughout the construction process. So, uh, in this case,
[31:22]
it's the engineer on record that is doing the monitoring
[31:25]
and not city staff in this case. But throughout the
[31:28]
process, I believe city staff are notified on reports of
[31:31]
the monitoring in place. That's great. Thank you so much.
[31:35]
Um, I just have a few more questions. Uh, one
[31:41]
is. You know, I know one of the concerns, this
[31:42]
is not development related issue, but one of the concerns
[31:46]
that I hear from folks is, you know, whether the
[31:50]
number of jobs that this development would create. And I'm
[31:53]
just wondering if staff can remind us how many jobs,
[31:55]
um, this development would create versus what's going on. Three
[32:02]
stuff. Yep. Through the chair, the commercial space plan for
[32:04]
the project has a minimum of about 6, 300 square
[32:07]
metres, which is about 68, 000 square feet, including retail
[32:10]
office, um, a large child care facility. And so these
[32:14]
uses altogether would add up to approximately 520 to 555
[32:18]
jobs. Great. Thank you. And my last question is would
[32:22]
you be able to just talk to, you know, this
[32:24]
is the CD 94 space. So this is the towers.
[32:29]
That's connected to the CB95, which is the supportive housing.
[32:34]
And I know that's something that everyone cares very much
[32:36]
about. I know there are many details. But, um, I'm
[32:40]
just wondering if you could talk a little bit about
[32:41]
how those two development permits work together at this stage.
[32:46]
Yeah. So it's through the chair. It staffs understanding that
[32:49]
the applicant is currently and actively finalising the broader funding
[32:54]
framework with BC housing and its provincial partners. Um, and
[32:57]
staff's conversations with the developer, it should be noted that
[33:00]
there is still dedicated to providing this affordable housing facility
[33:03]
in Port Moody and are working diligently to ensure that
[33:06]
the project's long - term financial viability and the developers
[33:09]
looking forward to continuing, um, the partnership with the city
[33:12]
to navigate these next steps. Um, it is kind of
[33:14]
challenging right now, but I will also note that as
[33:17]
part of the development agreement that was registered on title
[33:20]
as part of the rezoning application, um, the, uh, sorry,
[33:24]
a housing agreement by law is required to come forward
[33:27]
to Council and to be adopted prior to any superstructure
[33:32]
building permit issuance. So prior to issuance before the towers
[33:36]
are built, um, the city or the applicant or the
[33:40]
developer in this case is required to have a housing
[33:42]
agreement in place required to be approved by Council. Fantastic.
[33:47]
So nothing about what we're passing tonight to make something
[33:48]
changes to that. No. Thank you. I just thought it
[33:51]
would be important for the public to hear. Yeah. Thank
[33:53]
you so much. Um, I just want to clarify a
[33:56]
couple of things. Like Council has given final approval to
[33:59]
this application. This is the next step. Which is building,
[34:03]
uh, sorry, which is development permit. And then the next
[34:06]
step after that is the building permit. Um, so just
[34:09]
to, just for clarity on that. But I, you know,
[34:13]
there's, I appreciate Councillor Lubick bringing up the jobs that
[34:15]
it's creating 555 jobs is not insignificant. And it is
[34:18]
actually quite a significant increase to what exists there today.
[34:23]
Um, and in addition, we've been hearing about, um, we've
[34:28]
been hearing and getting, you know, sort of feedback about,
[34:32]
about this application and about the fact that this isn't,
[34:35]
uh, this is not providing enough, um, two or three
[34:39]
bedroom homes. I want to just make it very clear
[34:43]
on this development. Almost half of the units that are
[34:48]
being proposed are two and three bedroom. And they are
[34:51]
all above, um, they all exceed the required minimum FSR.
[34:57]
So these are all good size units and a lot
[35:01]
of them are designed for families and designed for people
[35:04]
for multiple bedrooms. So that's important information. These are not,
[35:08]
um, you know, these, these are not what is being
[35:11]
characterized by some. And, you know, I think, I think
[35:15]
it's important and it's also, um, a sign that the
[35:21]
proponent that's bringing these forward is really, has really put
[35:24]
a lot of thought into it. The other important aspect
[35:26]
of this is, and I think we're sharing is the,
[35:30]
uh, the way that these, um, that this development has
[35:33]
been planned has been planned in a way that it
[35:36]
can be flexible around market needs. So if there is
[35:41]
a desire for more of one type of unit versus
[35:44]
another, they have the ability to make those changes. So
[35:47]
I think that that was one of the selling features
[35:49]
for me at least. And in approving this application. All
[35:53]
right. So it's been, has it been moved. Uh, no.
[35:57]
Okay. Moved and seconded. I will call the question then
[36:01]
all in favor. Opposed Councillor Labecky as opposed. Thank you.
[36:05]
That brings us through the end of the consent agenda.
[36:11]
Um, so we will now go to new business. So
[36:14]
we have the first item, which is 205 Mount Royal,
[36:17]
which is a development variance permit. There's a recommendation. Oh,
[36:22]
and before we get to that, um, this is, we
[36:26]
have an opportunity for public input on this specific item.
[36:32]
And I will. And we also have a presentation. So
[36:35]
we'll have the presentation first, Madam Clerk. And then we
[36:39]
will, um, invite anyone in the public who has an
[36:41]
interest in this specific application to come forward and provide
[36:45]
comment if they wish. All right. Um, go ahead. Good
[36:52]
evening. Um, I'll be presenting the development variance permit at
[36:56]
205 Mount Royal Drive. Yeah. Sorry.
[37:06]
Just an issue here. With there we go. Um, so
[37:09]
in July 2025, the applicant had applied for a minor
[37:15]
DP air minor development permit for a four unit small
[37:17]
scale. Multi - using housing development, a schmoo. Today we're
[37:23]
asking for Council's consideration of development variants permit DVP0036 for
[37:30]
two setbacks. Um, after Council consideration, the next steps for
[37:34]
the applicant would include further refinement of the minor DP
[37:37]
and eventually moving on to building permit. The subject property
[37:45]
is located in the sea view neighbourhood. As you can
[37:48]
see, it's boarded here by Mount Royal to the north.
[37:53]
Gross Lane to the east and veterane to the south.
[37:58]
The OCP designation is for low density residential and its
[38:02]
zone semi detached residential RT. There is a class C
[38:10]
water course or a ditch. Located adjacent to the property
[38:13]
running parallel with the Eastern property line, long gross lane.
[38:18]
The city zoning bylaw requires a five metre setback measured
[38:21]
from top bank for all classy water courses. During the
[38:29]
site planning for the four unit schmoo, the applicant felt
[38:32]
that the required setbacks provided significant challenges for their site
[38:37]
planning and what they were trying to achieve. In turn,
[38:40]
the applicant is proposing a reduction to the riparian protection.
[38:44]
And enhancement area. And the interior lot line setback. So
[38:50]
as you see in the table, the RPEA requires five
[38:54]
metres as per zoning bylaw. The applicant is proposing 2.
[38:57]
2 metres, which is a variance of 2. 8. Additionally,
[39:01]
the interior side lot line requires a 1. 5 metre
[39:04]
setback. The applicant is proposing 1. 2 metres with a
[39:08]
variance of 0. 3 metres. The sight plan you see
[39:16]
it in front of you illustrates the requested variances against
[39:19]
the proposed schmoo sighting for two duplex buildings in a
[39:23]
garage structure. The thick blue line at the bottom would
[39:28]
be the ditch location. The thin blue line is the
[39:32]
top of bank. The green dotted line would be the
[39:35]
required setbacks. And the red dotted line is the proposed
[39:40]
setback. It should be noted the applicant is respecting an
[39:45]
additional 1. 2 metre buffer between the building and the
[39:49]
proposed RPEA setback to allow for construction maintenance of the
[39:53]
buildings and access without disrupting the RPEA. A restoration plan
[40:01]
has been prepared by the applicant's QEP, which includes protection
[40:06]
fencing and shrub planting. The restoration plan's been reviewed by
[40:10]
staff and staff is satisfied with what's being provided. And
[40:17]
that would conclude the presentation. Staff is satisfied with the
[40:21]
respiration plan. They're satisfied with a variance. They think that
[40:24]
that's an acceptable variance. Yes. Okay. Thank you very much.
[40:29]
Councillor Knowles. Uh, I will move the recommendation. It's been
[40:33]
moved. Oh, before we're just going to use this opportunity
[40:38]
to ask any questions of staff. No. Okay. And public
[40:44]
input of the Councillor Labecki. Did you have a question
[40:47]
of staff? I did. Um, do we know the size
[40:50]
of these units? Did you say. The final site design
[40:55]
is still being refined through the minor DP process. But
[40:59]
with the variants, uh, they could have, and the permitted
[41:06]
FAR for the zone of 0. 8. They could have
[41:09]
up to 6, 100 square feet across the four units.
[41:13]
And without the variance, they would be allowed up to
[41:19]
4, 900 square feet across the four units. Another question
[41:24]
through the staff. If we do not grant the variance,
[41:28]
my understanding is that the lot in titlement exists. However,
[41:33]
it has to fall within our regulations and requirements as
[41:37]
a city. So if we were to not grant this
[41:39]
variance, would the applicant then simply have to figure out
[41:43]
how to bring something forward, whether that's three units, um,
[41:46]
for example, that did follow our rules and requirements under
[41:50]
the zoning. Is that correct? Through the chair, yes, that's
[41:53]
correct. If the variance wasn't granted, um, the applicant would
[41:57]
need to relook their site design as to how they
[42:02]
want to propose their schmoo. Okay. Thank you. I'll leave
[42:03]
it there and leave my comments till after Republican put.
[42:06]
Okay. Thank you. Councillor Agtrap question for staff? Yes. Thank
[42:11]
you. Can you repeat, um, what the size would be
[42:14]
if they had, if variants weren't granted. Sure. Yes. Through
[42:18]
the chair, um, this would be an approximate measure. So
[42:23]
sorry, without the variance, it would be 4, 900 square
[42:29]
feet across the four units. Okay. Thank you. And with
[42:33]
it, it's 6, 000 hundred. Yeah. Thank you. Approximate. Okay.
[42:40]
Uh, Councillor Morrison, question for staff? Yes, it is. Go
[42:43]
ahead. Uh, besides the, uh, environmental setback variants that we're
[42:48]
talking about right now, does it meet all other requirements
[42:50]
of the schmu, um, setbacks from all the other lines,
[42:56]
et cetera, and would comply in every other way. Do
[42:58]
the chair. So this would be specific to the zoning
[43:02]
bylaw. Any of the schmoo requirements would be for the
[43:05]
review doing the minor DP process. So their occurring concurrently,
[43:11]
but, uh, the minor DP would need to be for
[43:13]
the refined once the applicant has for the direction regarding
[43:16]
the setback variances. So the answer to that question is
[43:21]
you're not sure. Well, sorry. The question is, are there
[43:26]
any other variances or any other, um, is the, is
[43:29]
the proposal asking to go outside of the scope of
[43:32]
what we have as our schmug guidelines. Other than the
[43:40]
variants. So the schmo get, no, just, pardon me, just
[43:43]
the setbacks. Oh, I'll let Ms. Smith answer, perhaps maybe.
[43:48]
Go ahead, Ms. Smith. Yes. Uh, thank you, three worship.
[43:51]
Um, so in this case, it's been given a high
[43:53]
level review. So in terms of set facts and so
[43:55]
forth, all the big moves, uh, this has been identified,
[43:58]
or these have been identified as the two variances that
[44:00]
would be required. I think, um, what, uh, what the
[44:04]
staff member is referring to is more, the, you know,
[44:06]
building code review. There's more minor tweaks that may need
[44:09]
to happen. But in terms of the big moves, the
[44:11]
big pieces, this is what has been identified. I guess
[44:14]
the question is, other than the variants, does this meet
[44:18]
our schmo requirements. It within our own, within our own,
[44:23]
um. Within our, within our own guidelines. Through the chair,
[44:29]
my understanding is, yes, we would have done a complete
[44:31]
zoning review. Okay. So it should be more only more
[44:33]
minor building code type issues. Perfect. So in other words,
[44:36]
without answering, yes category C water course. It would be
[44:40]
in compliance with the schmo guidelines for a four units
[44:42]
on this size of property. It's basically what I'm trying
[44:45]
to get at. So, okay. Thank you very much. I
[44:47]
appreciate that confirmation. Thank you. I don't see any other.
[44:53]
You want to, you put your. Okay. I don't see
[44:57]
any other hands up. So thank you very much for
[44:59]
that. Um, at this point I'm going to open it
[45:02]
up for public for any member of the public who
[45:04]
feels that they want to weigh in or comment on
[45:07]
this application. And if you're online, please use the raised
[45:12]
hand function. I'll call a second time. Is there anybody
[45:16]
who wishes to address counsel with regards to this. A
[45:22]
third and final time. Seeing none, then we will close
[45:26]
the public input and we will move to, uh, Council
[45:31]
Comets. Councillor Knowles. I will remove the recommendation. Thank you.
[45:36]
Thank you. Um, is there a seconder. Okay. Thank you.
[45:40]
So, um, I just wanted to say that I appreciated
[45:42]
the, um, the report from staff on this. I actually
[45:45]
know this property quite well. I've driven through this neighbourhood
[45:48]
trillion times over the years. Um, so I did a
[45:52]
little site visit today of my own. And, um, and
[45:54]
was, was quite satisfied that staff's recommendation makes sense to
[45:58]
me. Yeah. The ditches, I mean, you wouldn't even know
[46:02]
it was there. So, um, I think for the, for
[46:05]
the benefits that are going to come to this development
[46:08]
in terms of size for the four units, um, and
[46:11]
the fact that, um, this neighbourhood, we're seeing more of
[46:16]
these in this neighbourhood. And I don't think it's going
[46:17]
to be out of place. Uh, I'm happy to support
[46:19]
this one. Thank you. Thank you, Councillor. Councillor Lerbecki. Thank
[46:25]
you. Actually, if it's okay. So I have one more
[46:27]
question for staff. Um, if I answer how much yard
[46:31]
space is there. If you have kids living in this
[46:35]
unit, how big is the yard for them to play
[46:37]
in. Through the chair, the final sight planning still needs
[46:42]
to be, um, refined. But, uh, the schmo requirements require
[46:47]
a minimum of 10 metres squared for all, uh, individual
[46:51]
units. So they would still have to comply with our
[46:56]
regulations around what the green space requirement was. Okay. Um,
[47:04]
10 metres squared. Interesting. So we hear a lot about
[47:08]
the provincial legislation at this table. And this is an
[47:12]
example where the decision sits with council. And my strong
[47:16]
view is if we want to, um, given this legislation
[47:21]
is overlaid now in our single family lots. If we
[47:24]
view our entire city with this potential, that is where
[47:27]
I get very uncomfortable with approving variances like this. Because
[47:33]
I don't think that setting a very good precedent. I
[47:36]
think if we, um, want to point fingers on legislation,
[47:39]
we claim that we have all these issues with. Then
[47:41]
when we do have control, we should take back control
[47:43]
of what we do. And my strong view is if
[47:45]
you're not following our variances, that you should build less
[47:49]
units or come back with a plan that follows our
[47:52]
rules. They're there for a reason. I don't think we
[47:55]
can be granting variances across every schmu application that comes
[47:58]
our way. Um, I feel very strongly about that. Just
[48:02]
because something has a word duplex beside it or townhome.
[48:05]
That's definitely the housing I want to see built. But
[48:07]
I'm not going to raise my hand in approval for
[48:10]
anything. And, and for me as a councillor, it's been
[48:14]
pretty consistent. If my support is to be provided for
[48:18]
development applications, if our rules and our expectations are fully
[48:22]
followed, chances are you'll get my support. So I'm not
[48:25]
going to be supporting this variance. I think that the
[48:28]
SEPAC should be not halved. The side going down to,
[48:32]
you know, variants of down to 1. 2. So I
[48:36]
won't be supporting this. Thank you. Thank you, Councillor. Councillor
[48:42]
Agtarot. Thank you. Um, one more question for staff on
[48:44]
final question. If there was no ditch with this project
[48:46]
need variances. Through the chair, if there was no ditch,
[48:51]
then, um, the applicant would have the full space to
[48:56]
develop on. Okay. So I think that, thank you. I
[48:59]
think, um, for me, because it's, it's a ditch. It
[49:01]
doesn't have any aquatic life. It's, it's simply for stormwater
[49:05]
conveyance. Um, to, um, require, um, full setbacks from this
[49:12]
ditch. And by doing that, the units would be likely
[49:15]
be 300 square feet smaller. Yep. Um, and we have
[49:20]
said family friendly housing is a priority. And this is
[49:24]
an example of roughly 1500 square feet of family friendly
[49:28]
housing, um, and, and to make it smaller each unit
[49:32]
smaller by 300 square feet for a ditch that doesn't
[49:35]
convey water and does not hold any aquatic life. Um,
[49:39]
seems like a reasonable trade off to me. So I'll
[49:42]
be supporting. Thank you. Thank you. Yeah. I, I feel
[49:46]
the same way Councillor Dilworth. Thank you. I'm going to
[49:50]
speak in support of the application. I think one of
[49:53]
the key points for me is the uniqueness of the
[49:56]
property being enclosed by roadways on three sides, which ensures
[50:01]
adequate and appropriate egraphs to the ingress egress to the
[50:06]
property. Um, I also think it's very fitting in the
[50:09]
neighbourhood. We've seen over the past couple of years we've
[50:12]
seen property owners, uh, evolved, their single family property lots,
[50:17]
um, either by subdividing, by doing, uh, small house subdivision.
[50:23]
And I think looking at two duplexes is a right
[50:27]
mix. And not just for, for families, you know, I
[50:30]
think a number of people that live up in the
[50:33]
sea view Glenair, even college park area are still older
[50:37]
families and they are looking to downsize. They have children
[50:40]
that are looking for access to homes. This could be
[50:43]
generational property. This could be having elderly parents move in.
[50:47]
I think it's exactly what Schmoo housing is meant to
[50:51]
be. And I'm very supportive of it. What else have
[50:54]
I got here? And the 10 by 10 green space
[50:57]
for every unit, that's a lot of green space on
[51:00]
that particular piece of property, I think. And I will
[51:03]
just, I'm not going to repeat everything that Councillor Egg
[51:06]
Trap said, but certainly one of the winning points for
[51:09]
me was the severance does allow for larger units and
[51:14]
more living space for whoever's going to live there. So
[51:17]
I am going to support this application this evening. Thank
[51:20]
you. Uh, Councillor Morrison, go ahead. Thank you. Um, I
[51:26]
appreciated staff answers those questions and thank you Councillor Egg
[51:28]
Trapp for bringing in clarifying a couple of those things
[51:31]
for us about the, um, the water course, um, category
[51:38]
C. Um, we have a goal as a council to
[51:41]
try to work with people to provide housing solutions. Um,
[51:45]
just, just because we're asking for a variance on this
[51:48]
one thing, we need to look at each individual application
[51:51]
regardless of what it is, whether it happens to be
[51:53]
a townhouse development, um, a schmud designation development or a
[51:58]
tower based on its individual merits and what is providing
[52:00]
to the community in that moment. Um, I appreciate that
[52:03]
the province did not do any consultation with the city
[52:06]
before rolling these things in. And I've mentioned that many,
[52:09]
many times before. But when, when, when we're not able
[52:14]
to provide another family sized unit for somebody because of
[52:17]
a ditch in the way that has no bearing environmentally
[52:20]
on anything around it. And staff are comfortable with this
[52:23]
report. And we're going to say, let's reduce the unit
[52:26]
by one. It's providing all on site parking, one per
[52:32]
unit. So we're not saying it's going to overflow into
[52:34]
other units. Um, it's, it's a larger size, which is
[52:39]
part of that missing middle that we're trying to provide.
[52:42]
Um, that we hear from this Council table all the
[52:44]
time about trying to provide more missing mental housing. And
[52:47]
then we're going to say no because we're doing a
[52:49]
variance. This is not a blanket statement we're going to
[52:52]
create a precedent that every single, uh, Class C water
[52:56]
course is going to be a variance. The fact that
[52:57]
it has the back lane, the fact that it's on
[53:00]
the end of a unit and has the side as
[53:02]
well, um, and that this happens to be underneath the,
[53:05]
uh, right on the edge of the property line. Let's
[53:09]
try to work with people to find solutions instead of
[53:11]
just putting up barriers. We need to stop finding solutions
[53:15]
instead of excuses to provide family housing. And I'm hearing
[53:18]
too much of that, um, whether it happens to be
[53:21]
a tower site that has 45 percent of its unit,
[53:25]
or it happens to be this, which is going to
[53:28]
be all family units. Let's find ways to work with
[53:30]
people to provide this. We're still in a housing crisis
[53:32]
here. Right. And we still need to be providing this.
[53:35]
And I think we need to look at the individual
[53:37]
merits instead of trying to make blanket statements about not
[53:41]
allowing something because it needs a variance and trying to
[53:44]
push back as if that's the way to push back
[53:46]
on the government's mandates. So, um, those are my thoughts.
[53:49]
Sonic, I'm going to be supporting this application because I
[53:51]
do believe in larger family size homes. And we don't
[53:54]
get a ton of them. Um, brought in. If this
[53:56]
was two lots and it had eight units on it
[53:58]
as townhomes, we'd be very happy to have townhouses there.
[54:00]
So the fact that this has four units on it,
[54:02]
consider it like a very small townhouse complex in a
[54:05]
way. Thank you. Thank you. Councillor Lubeck. Thank you so
[54:09]
much. I'll be brief. Um, you know, I appreciate the
[54:12]
conversation at the table, honestly. You know, I would have
[54:16]
a lot more concerns if this was a development that
[54:19]
covered the entire property that did not have permeable surfaces
[54:22]
and play areas. And if the riparian area was anything
[54:27]
other than class C. And so I really appreciate that
[54:29]
staff have worked with the applicant to be able to,
[54:35]
you know, make adjustments. Um, and I just wanted to
[54:36]
say like, I think it's very important that we do
[54:40]
look at things application by application. Um, just, was it
[54:46]
last week, last week, I think we had an application
[54:48]
where council was not satisfied with the setbacks and said
[54:53]
so and pushed back. And we'll see what happens there.
[54:56]
But technically that was allowed. Um, this, well, that was
[55:01]
a love by provincial legislation on our legislation. But this
[55:06]
meets the goals that we're trying to achieve. And, um,
[55:10]
yeah, I just think it's important that we look at
[55:12]
things on an individual basis and not necessarily. Not necessarily
[55:17]
make blanket recommendations. Thank you. Thank you, Councillor. Yeah. I
[55:25]
mean, I'm looking at all the notes that I took,
[55:28]
um, when I was reviewing this report. And as I
[55:30]
was listening to, um, to staff's answers and sort of
[55:35]
my, my thoughts, I wrote, I feel that we need
[55:39]
to look at each application as a unique opportunity to
[55:42]
provide in fill housing. And we cannot, we have to
[55:47]
approach this with the, with, with the notion that we
[55:52]
sit at this table, as has been mentioned. And we
[55:55]
talk about how important housing for families is. This is
[55:58]
housing for families. And to simply say, no, because there's
[56:03]
a variance. To me, just is really counterintuitive to what
[56:09]
it is that we're trying to achieve here. I mean,
[56:11]
I had somebody ask me the other day. What are
[56:13]
you doing? What have you done for family housing? Well,
[56:16]
these are the kinds of applications that we want to
[56:19]
see. So we're looking at the difference between four, 1500
[56:22]
square foot units versus four 1200 square units. Like why,
[56:28]
like, if I had an opportunity to increase a housing
[56:32]
for families by 300 square feet, that's significant for a
[56:36]
family. And you would not want to, um, to, to
[56:39]
minimize that. So of course, um, I'm going to support
[56:43]
this. And again, we need to look at these applications
[56:46]
as unique opportunities for housing and not try to blank
[56:49]
it, put a blanket across all applications that come forward.
[56:53]
This does not in any way negate the criticism that
[56:56]
we had around the way that this, that this legislation
[56:59]
came in. And the fact that there was no consultation.
[57:02]
And the fact that we didn't plan for many of
[57:04]
the areas in the city that are calling for this
[57:07]
type of infill development to occur. However, this neighbourhood actually
[57:10]
did, does contemplate that directly across the street. There's townhouse
[57:14]
development and around the corner. So this is the ideal
[57:18]
neighbourhood for this type of infill housing. This is a
[57:20]
perfect lot. It has been mentioned. It has, uh, for
[57:23]
the exposures on, on the side. And, you know, I
[57:25]
just, I just think it would be like, what are
[57:29]
we trying to prove if we say no? Because the
[57:31]
variance. When this is exactly the kind of housing that
[57:34]
we're asking for is it makes no sense to me.
[57:38]
Um, so yes, of course, I will be supporting this.
[57:43]
So we'll call the question that for the record, I
[57:47]
just want to note that the statutory notification requirements have
[57:50]
been met and there were no written submissions received in
[57:52]
response to that. Thank you. Thank you very much. Uh,
[57:55]
so I'll call the question then all in favor. Opposed
[57:58]
Councillor Larbecki as opposed. All right. Great. We'll move on
[58:04]
to the next item. Which is Heritage Alteration Permit 101
[58:11]
First Avenue. And this is for school district 43. Welcome.
[58:16]
Thank you.
[58:50]
Good evening Mayor and Council. My name is Terrence Chang
[58:53]
and I'm the development planner responsible for this project on
[58:56]
one - on - one First Avenue. Tonight, Council will
[59:00]
be considering the heritage alteration permit and development permit application
[59:04]
for this project. At the applications are approved by Council,
[59:08]
the project will be able to move, sorry. Will be
[59:12]
able to move forward to the building permit stage. Following
[59:15]
the issuance of the heritage alteration permit and the development
[59:19]
permit. Subject site is a corner lot located at the
[59:24]
intersection of IOCA Road and First Avenue. The proposed site
[59:27]
consists of one legal parcel that is a heritage protected
[59:31]
site. The city and the school district currently has a
[59:34]
joint use agreement to utilise the site. The site is
[59:39]
zone P1, which accommodates public service uses on public land,
[59:43]
including cultural recreational and administrative uses. Surrounding uses include commercial,
[59:50]
residential, and recreational spaces. The site requires an environmental development
[59:55]
permit as a portion of the site to the east
[59:57]
is classified as a high environmentally sensitive area. The site
[1:00:02]
is also within Dioko Townsite Heritage Conservation Area, which envisions
[1:00:07]
an opportunity to act as a generator of new development
[1:00:10]
with opportunities for adaptive reuse sensitive infill and revitalization. Imperial
[1:00:19]
oil established the planned iocal town site in the early
[1:00:22]
1920s. As a refinery, uh, was located in an isolated
[1:00:26]
area, the lacked road access until 1925. The town was
[1:00:30]
officially opened on October 1st, 1921 and contained two churches,
[1:00:36]
a community hall, a post office, a Bowling Green and
[1:00:39]
Clubhouse, tennis courts, and a sports field. The town's opening
[1:00:43]
also included a school, which was located at the entry
[1:00:46]
of the town. And across from the Ayoko Church, the
[1:00:50]
Bowling Green and the CPR Railway track. The school was
[1:00:53]
a wood frame construction with wooden lap siding at the
[1:00:56]
Foundation Level and Cedar's shingles above. All the children and
[1:01:00]
the town site attended the school, providing education ranging from
[1:01:04]
the first grade to university entry classes. The semi -
[1:01:07]
detached gymnasium was constructed in the late 1950s. Historical records
[1:01:12]
indicate that the school transitioned to an elementary school sometime
[1:01:16]
in the mid - 20th century and was converted to
[1:01:18]
an alternate school in the mid - 1990s. The school
[1:01:22]
officially closed in 2005 and school district 43 has continually
[1:01:26]
maintained the school following its closure. The application being considered
[1:01:33]
tonight proposes interior and exterior renovation to the IOCA school
[1:01:37]
site to accommodate 150 space licensed childcare facility. The proposal
[1:01:43]
seeks to preserve the wood frame structure and character -
[1:01:46]
defining elements of the school. Rehabilitate the interior to approve
[1:01:51]
functionality of the space and provide upgrades to mechanical and
[1:01:55]
electrical systems, seismic integrity, and accessibility. A heritage consultant has
[1:02:00]
been retained by the applicant and has worked collaboratively with
[1:02:05]
staff to ensure minimal impact on the heritage value of
[1:02:08]
the building. The heritage consultant will remain oversight of the
[1:02:12]
building during construction. Oh, sorry. Outdoor play and covered areas
[1:02:19]
are also proposed with an accessibility ramp located to the
[1:02:22]
east of the site to provide access to the upper
[1:02:24]
floor of the school from the outside. Once constructed, the
[1:02:28]
project will include 36 spaces for infant and toddlers, 66
[1:02:33]
bases for children's ages three to five and 48 spaces
[1:02:36]
for school - age children for before and after school
[1:02:39]
care. The facility will be run by a non -
[1:02:42]
profit childcare operator and will deliver affordable childcare fees to
[1:02:46]
the province's fee reduction program. 20 vehicle parking spaces are
[1:02:51]
being proposed along with outdoor bicycle and indoor bicycle parking
[1:02:55]
spaces. Following the results of the traffic impact assessment, the
[1:02:59]
application, the applicant will explore circulation constraints with staff resulting
[1:03:05]
from pickup and drop - off. Options to alleviate parking
[1:03:09]
concerns may include dedicating parking spaces for pickup and drop
[1:03:13]
- off, an additional bicycle parking spaces. In conclusion, in
[1:03:20]
the words of the applicant, since its closure in 2005,
[1:03:23]
the 1921 Iocal Schoolhouse, a designated heritage landmark and Port
[1:03:28]
Moody has long - awaited a second act. Staff are
[1:03:32]
supportive this proposal as the adaptive reuse of the school
[1:03:36]
site represents a balanced approach to heritage preservation while providing
[1:03:40]
150 new childcare spaces to the community. Thank you very
[1:03:45]
much. I would also like to note that there was
[1:03:47]
a minor clerical error in the report and that the
[1:03:50]
correct report has been provided as an on - table
[1:03:52]
attachment. Staff and the applicant team are available to answer
[1:03:55]
any questions. Thank you. Right. I'll go to Council.
[1:04:06]
Nobody. Oh, Councillor Act Raph. I like to move the
[1:04:10]
recommendation. Okay, it's been moved and seconded. And I just
[1:04:13]
like to thank the applicant, which is the school board,
[1:04:16]
I think, for imagining, reimagining this space as, um, a
[1:04:21]
community benefit that school has been empty for a while.
[1:04:25]
And I really appreciate the efforts in going through the
[1:04:29]
efforts of preserving the heritage while creating much - needed
[1:04:34]
childcare spaces in our community. So I fully support this.
[1:04:37]
Thank you, Councillor Councillor Dilworth. I will second second this
[1:04:41]
report. And I want to say that was a great
[1:04:44]
representation that you made. I really appreciated the sort of
[1:04:47]
historic angle and storytelling around the application. So I really
[1:04:54]
appreciated that. Um, first of all, I want to give
[1:04:55]
extreme gratification to the school district who have literally spent
[1:05:01]
decades committing to maintaining the integrity. And all the appropriate
[1:05:07]
care to keep this, uh, building in a space where
[1:05:13]
it can be reused. Far too many times at this
[1:05:16]
table, we see many of our older and historic buildings
[1:05:19]
being denigrated due to lack of maintenance. So, um, big
[1:05:23]
thank you to the school district for that. Uh, absolutely
[1:05:27]
going to support this. I am excited to see a
[1:05:29]
new gathering space in that part of our city. It's
[1:05:33]
not just going to be a child care centre with
[1:05:35]
the field renovated with the space there. I think it's
[1:05:38]
going to be very welcome at that end of the
[1:05:42]
city. So I do support this. Thanks. Thank you, Councillor
[1:05:45]
Councillor Knowles. Uh, yeah, I won't be labour much of
[1:05:48]
what my colleagues have said. I am two main things.
[1:05:52]
I'm also excited to see this area come back to
[1:05:54]
life literally. It's quite dead and dusty and brown in
[1:05:58]
that area right now. And I think having a bunch
[1:06:00]
of, um, happily playing children will be lovely. Um, I
[1:06:04]
also wanted to send, um, sincere thanks to the school
[1:06:07]
board, we've had some really productive and just overly generous
[1:06:13]
meetings, I feel with the school board lately. And it
[1:06:16]
has been really nice to, um, for this council, I
[1:06:19]
feel like to, to rebuild those relationships and to get
[1:06:22]
back on track. And I'm really looking forward to working
[1:06:25]
together with them on future projects. Thank you, Councillor. Councillor
[1:06:30]
Lerbecki. Thank you. Just wanted to say how excited I
[1:06:32]
am for this project. Uh, when you think of a
[1:06:35]
place that, again, we're speaking of space for children, 10
[1:06:38]
square metres is not very big. And when you're thinking
[1:06:40]
of, I think that's 107 square feet of Google is
[1:06:43]
correct. So when I think of a place where children
[1:06:47]
should be playing, this is exactly the type of location
[1:06:49]
that I think is ideal in terms of, um, the,
[1:06:53]
not only the exciting building renovation that will be undertaken.
[1:06:57]
And the historic, uh, nature of this spot that can
[1:07:00]
be learning opportunity for families and children attending there. But
[1:07:04]
the setting that it's in as well. So it's very,
[1:07:06]
very exciting. It's going to deliver much needed childcare. And
[1:07:11]
I just can't wait for it to be finished. I
[1:07:12]
know I've heard that from many people in the community.
[1:07:14]
So thank you so much. Thank you. Uh, Councillor Lubick.
[1:07:19]
Thank you so much. Yeah. I'll be brief. Just very
[1:07:23]
much appreciate all the work that's been done. And 150
[1:07:26]
new child care spaces is really impressive. And well being
[1:07:32]
able and for a variety of ages. I'm really excited
[1:07:37]
to see this. I also, as you were speaking was
[1:07:40]
kind of reflecting on just the history again of the,
[1:07:44]
of the site. And, you know, that's the importance of,
[1:07:48]
the importance in preserving those buildings because it captures the
[1:07:51]
stories of, you know, how we got, where we are.
[1:07:55]
And this is a new chapter in that story. Um,
[1:07:59]
and so I think it's, I think it's a very
[1:08:01]
special project. So thank you so much. Thank you. Yeah.
[1:08:05]
I would only add that. I hope that we'll have
[1:08:07]
an opportunity to sort of integrate some of that history
[1:08:09]
into the building in terms of perhaps maybe a plaque
[1:08:13]
acknowledging the origins of the building along those lines, something
[1:08:17]
like that. But, um, yeah, I'm, I'm also very supportive
[1:08:20]
of this. I will call the question all in favor.
[1:08:24]
Opposed carry unanimously. Thank you very much, Mr. Chang. Thank
[1:08:27]
you. Thank you. Next item is 11. 3, which is
[1:08:31]
Kyle Centre redevelopment project update and request for additional capital.
[1:08:36]
We have a, yeah, we have a presentation. Great. Thank
[1:08:40]
you.
[1:09:06]
Go ahead. Good evening Mayor Council. Thank you for the
[1:09:10]
opportunity tonight to bring you an update on the Calo
[1:09:13]
Centaury Development project. I'm going to start, uh, start with,
[1:09:18]
uh, sharing the proposed conceptual design that was shared recently
[1:09:23]
during the second round public engagement, uh, before I go
[1:09:28]
into some more details on the next step for the
[1:09:31]
project. Just a recap that the project is proposed to
[1:09:38]
take place over four phases. We're currently in the first
[1:09:41]
phase or the conceptual design phase, uh, we've done a
[1:09:45]
couple rounds of public engagement and the main deliverables for
[1:09:51]
this current phase, uh, would include a final concept design
[1:09:56]
along with class D cost estimates and funding strategies. And
[1:10:02]
if Council approves, uh, then we'll go forward to the
[1:10:05]
next phase, which would be detailed design to be followed
[1:10:08]
by phase three construction of the community centre in plaza.
[1:10:11]
And then followed by phase four construction of Kyle Park.
[1:10:20]
Um, so, uh, on the screen there, there's a number
[1:10:22]
of key themes that came out of round one engagement.
[1:10:26]
I'm not going to go into details here, but I
[1:10:28]
would just name a couple such as connecting indoor and
[1:10:31]
outdoor spaces and finding a balance between flexible and specific
[1:10:35]
users for this basis. Um, I just want to note
[1:10:38]
that these, uh, he, themes were all considered, uh, in
[1:10:41]
during the development of the conceptual design. So this is
[1:10:48]
a concept plan overview. You can see that, uh, the
[1:10:55]
community centre is proposed to be situated right across from
[1:10:59]
the pomo arts building. The commute centre is setting it
[1:11:04]
at about 39, 000 square feet, which is more than
[1:11:08]
two and a half times of the existing cow centre,
[1:11:11]
which is at 11, 000 square feet. Um, so in
[1:11:15]
front of the commute centre, there's the plaza area. And
[1:11:19]
then down south, you see the existing cow park. There's
[1:11:22]
plans to do some renewals and updates to this existing
[1:11:28]
portion of Cal Park. And then to the north, uh,
[1:11:31]
here's the expanded portion of Kyle Park. And in this
[1:11:35]
concept design, the Kyle Street is proposed to be closed
[1:11:39]
between St. Andrews and St. George, uh, to provide better
[1:11:42]
connection between the plaza and the park space. We're also
[1:11:46]
looking at potentially closing portion of St George, as noted
[1:11:50]
here in the blue box. And there's nothing happening in
[1:11:55]
the Westernmost portion of the project site, but we have
[1:12:00]
research sufficient area for potential future low cost housing of
[1:12:05]
Council So Directs in the future. So this is a
[1:12:10]
3D illustration of the proposed concept plan. Again, you can
[1:12:15]
see the community centre right here, the plaza right here.
[1:12:19]
The renewed cow part to the south as well as
[1:12:24]
the expanded chiropart to the north. And then also the,
[1:12:27]
um, closed section of Cow Street through support connection between
[1:12:31]
the outdoor spaces. Um, the community centre sits on one
[1:12:36]
and a half levels of underground parkade. And you can
[1:12:40]
see the parquet ramp right here with entrance from St.
[1:12:44]
Andrew Street. The proposed community centre has two floors. Uh,
[1:12:51]
this is the ground floor plan. The main entrance is
[1:12:57]
right here, uh, from Kyle Street. As you go in
[1:13:01]
on your left would be the reception area, uh, as
[1:13:05]
well as the weight room. And on your right would
[1:13:08]
be a lounge area for people to socialize and chat.
[1:13:11]
And then further, would be the youth senior space games
[1:13:16]
room. And a fitness multipurpose space. Here's washrooms and showers.
[1:13:23]
And then down here is the gym, which is big
[1:13:25]
enough to fit, um, four pickleball courts. Moving on to
[1:13:31]
the second floor, um, we have the arts multipoppers space,
[1:13:35]
uh, which is strategically placed there to look across over
[1:13:40]
to the pomo arts building. We have a meeting room
[1:13:44]
in the middle here. And then, uh, unallocated programmable space
[1:13:48]
to the left. And then down south, um, we have
[1:13:52]
an event multipurpose space. There is also a prep kitchen
[1:13:58]
that's attached to the events multipurpose space to support warming
[1:14:03]
up of any catered food. It's not a commercial great
[1:14:07]
kitchen. So we do not intend that to be producing
[1:14:11]
food or major cooking in that area. So this is
[1:14:18]
an East elevation view of the building. Um, so you're
[1:14:22]
looking basically standing on Cal Street looking west towards the
[1:14:27]
building. You can see the plaza area, um, we do
[1:14:30]
intend to, um, program it throughout the year to make
[1:14:34]
it a very vibrant space. In the image here, you
[1:14:37]
can see a little, um, uh, concert happening at the
[1:14:40]
corner, um, further to the, to the north. You see
[1:14:46]
a little area here. This is a handy dart pickup
[1:14:49]
drop off area, uh, which would provide a short distance
[1:14:55]
to the main entrance, which is right here. Uh, I
[1:14:58]
do want to note that there is a little slide
[1:15:01]
here for children to go down from the, um, uh,
[1:15:02]
from up here to the plaza as the caregivers or
[1:15:09]
parents go down the stairs themselves. Um, so again, this
[1:15:14]
is the main entrance. And then to the right is
[1:15:17]
the lounge as well as the youth and senior space.
[1:15:19]
I mentioned earlier to the left is the, uh, staff
[1:15:25]
of reception area, uh, and then the weight room, uh,
[1:15:27]
to the left here. There is an accessible washroom here
[1:15:32]
that's intended for park or plaza users. So they could
[1:15:35]
access from the outside and without, um, going through the
[1:15:38]
building. And then upstairs, you can see the, uh, arts
[1:15:41]
multipurpose space on the right and the event multipurpose space
[1:15:46]
on the left. So I'm going to take you through
[1:15:52]
a few renderings of the building of the interior of
[1:15:57]
the building. Um, so the left image here basically are
[1:16:01]
you standing at the entrance. You can see that there
[1:16:04]
is a long corridor that runs through the length of
[1:16:08]
the building that all the spaces open into. Um, so
[1:16:12]
you can see the seating area of the lounge on
[1:16:15]
the right. On the left is the, um, reception area.
[1:16:19]
There's also a couple elevators that would take you up
[1:16:22]
to, um, the upper floor or down to the parquet.
[1:16:27]
The image on the, I'm sorry. Um, the image on
[1:16:30]
the right is just a different rendering showing further down
[1:16:36]
the corridor as you walk towards the west. You have
[1:16:39]
the, uh, fitness multipurpose space to the right and the
[1:16:43]
gym to the left. So this rendering, um, shows a
[1:16:48]
better inside of the gynacium. You can see also that
[1:16:54]
there's glazing along the walls here upper floor as well
[1:16:58]
as lower for people to look into the gym for
[1:17:02]
parents to look into their gym. If they're dropping off
[1:17:05]
their children for different activities or lessons here. The image
[1:17:10]
on the right is again, a look through the corridor,
[1:17:14]
but you're standing on the west side of the building
[1:17:17]
and looking back at towards the entrance. Just want to
[1:17:21]
note that there are, um, a lot of opportunities on
[1:17:24]
the wall spaces for different art display. Uh, so moving
[1:17:34]
on up to the second floor, again, we're looking towards
[1:17:37]
the entrance. We have the Arts multipurpose space on the
[1:17:42]
left. And then, um, the events multipurpose space on the
[1:17:47]
right. There's quite generous space for people to gather or
[1:17:53]
to wait before an event happens. Which could be a
[1:17:56]
wedding or a conference, et cetera. Uh, the image on
[1:18:00]
the right shows the interior space of the arts multipurpose
[1:18:04]
space. You can see that there is a lot of
[1:18:06]
glazing, um, included, um, to provide as much natural light
[1:18:10]
as possible for any artist that who might be working
[1:18:14]
in that space. So this renderer here, um, shows
[1:18:21]
a quick look, our overview of the outdoor spaces, um,
[1:18:25]
we have the expanded Kyle Park right in front in
[1:18:31]
the forefront. The closed section of Kyle Street and then
[1:18:37]
the plaza in front of the, um, centre. And then
[1:18:41]
the, um, the renewed cow park to the south. So
[1:18:45]
you can see that there is a lot of different
[1:18:46]
types of equipment and play features that are shown in
[1:18:50]
the playground here, um, but these are really, um, just
[1:18:54]
placeholders. We do intend that to have different structures and,
[1:18:58]
uh, features to provide a wide range of play values
[1:19:02]
for children of different ages. Um, I do want to
[1:19:06]
note that there is an accessible path that goes around
[1:19:09]
the core portion of the playground here. And that accessible
[1:19:12]
path also connects to the closed section of Kyle Street
[1:19:17]
and the Plaza in front of the committee centre. The
[1:19:27]
image on the left shows the stepped terrorists that are
[1:19:30]
sitting on top of the closed section of Cow Street.
[1:19:34]
We have included terraces here just to work those in
[1:19:39]
into the existing topography of the site because the great
[1:19:43]
drop is actually quite, quite huge. There's a lot of
[1:19:50]
movable furniture and elements here that could be changed out
[1:19:54]
over the year to support different programs in the space.
[1:19:58]
You can see that we have included a lot of
[1:20:00]
planting areas as well as trees to provide a microclimate
[1:20:04]
as well as shades, especially in the summer. Uh, the
[1:20:08]
image on the right shows the renewal Kyle Park. There
[1:20:11]
are two levels of terraces with the upper level showing
[1:20:15]
a basketball half court. Inten it for older youth and
[1:20:21]
teenagers. And the lower terrorist featuring a whole bunch of
[1:20:25]
different fitness and parkour type equipment as well as seating
[1:20:30]
areas intended for adults. Um, so in terms of next
[1:20:37]
steps, we are looking to implement a couple additional scopes
[1:20:42]
imminently. The first one being a traffic and access review
[1:20:49]
of potential closure or modifications to St. George Street. So
[1:20:53]
this would include consideration of existing residential and emergency access
[1:20:58]
with steep rates to the west, as well as alternate
[1:21:04]
trafficcoming provisions because the existing directional, um, diverter that's at
[1:21:09]
the corner of Kyle Street and St. George Street would
[1:21:11]
need to be removed. Uh, we also want to get
[1:21:14]
feedback from a JSON residential properties. Um, I just want
[1:21:18]
to note that this is an additional scope because we
[1:21:20]
didn't plan on closing St George. But we did hear
[1:21:25]
safety concerns, which came up quite high through the public
[1:21:29]
engagement. And so we want to address that. And we
[1:21:35]
also think that if what we do close as St.
[1:21:38]
George that would promote connection between the north and south
[1:21:42]
portions of Kyle Street of Kyle Park, sorry. And the
[1:21:47]
other additional scope is archaeological impact assessment and field work.
[1:21:52]
Um, so this we were originally planning to do this
[1:21:55]
work, um, in the next phase, just based on the
[1:21:58]
anticipated timing of the permit approval, um, but we have
[1:22:02]
received notice that the permit likely going to come in
[1:22:06]
in the next month or so. So we like to
[1:22:09]
start this work as soon as possible. So we could,
[1:22:12]
uh, get more information and de - risk the projects.
[1:22:17]
And in our engagements with First Nations, they have all
[1:22:19]
noted that, uh, archaeological assessment is a priority for them.
[1:22:25]
So in order to cover these additional scopes, we are
[1:22:27]
seeking 148, 000 dollars to be allocated from the community,
[1:22:33]
amenity contribution reserved, uh, to support this work. And moving
[1:22:38]
forward, we want to confirm the geotechnical and archaeological requirements.
[1:22:43]
We are committed to continued dialogue with interest holders, uh,
[1:22:47]
we do plan on a public engagement to get more
[1:22:52]
feedback into the chiropract detail design. Of course, this is
[1:22:56]
in the second phase or in the detailed design phase,
[1:23:03]
um, we want to make sure that we, um, share
[1:23:06]
any information in a timely manner as the project progresses.
[1:23:11]
And staff have started looking at potential relocation options of
[1:23:16]
existing co - centre programming. And we'll continue to, uh,
[1:23:19]
to move in that direction. And lastly, we will want
[1:23:23]
to consider and start planning to minimize any construction impacts
[1:23:28]
for the pomoarts building as well as neoby businesses and
[1:23:32]
residential properties. Um, so in terms of next steps, we
[1:23:37]
intend to bring back a brink to council, full sum
[1:23:42]
conceptual design report along with class D cattle cost estimates
[1:23:48]
and potential funding strategies. And we also be seeking council
[1:23:52]
approval to proceed to the next phase, uh, which is
[1:23:56]
detailed design. And if Council approves, uh, then in 2027,
[1:23:59]
we would be starting on value engineering and detailed design.
[1:24:05]
Uh, so this takes me to the, uh, to the
[1:24:07]
end of the presentation. I'd like to use the opportunity
[1:24:11]
to, um, to get any feedback that cancel to provide.
[1:24:17]
Okay. Thank you very much. I see Councillor Knowles has
[1:24:22]
did. Uh, thank you. I will begin by removing the
[1:24:25]
recommendation. That's if I may. Okay. Thank you. Um, thank
[1:24:29]
you so much for this report to all of the
[1:24:33]
staff from Chico Eu Ding. A lot of work in
[1:24:37]
planning has gotten us to this point tonight. My goodness,
[1:24:41]
I recall, and I'm not the only one. What I
[1:24:44]
ran for election for the first time in 2022. This
[1:24:46]
was on my list of things to do. So I
[1:24:49]
am very excited to be here tonight. Um, you know,
[1:24:53]
this was, this went to all the committees. This went
[1:24:55]
to so many user groups in the city, um, public
[1:24:58]
engagement, um, has been wide and deep. And I really
[1:25:03]
appreciate all the work that went into it. These are
[1:25:05]
not small, small things that are done. I mean, the
[1:25:09]
engagement that stuff does is hours and hours hundreds of
[1:25:12]
hours, um, throughout the city. And I just want to
[1:25:15]
acknowledge you for doing that. And you've managed to encapsulate
[1:25:18]
it all in multiple reports to us. What we're seeing
[1:25:21]
here tonight is isn't, you know, just one report. This
[1:25:24]
is one of several that we've seen, um, over many,
[1:25:26]
many, many months. So thank you for that. I think,
[1:25:30]
um, I'll make a few comments here. I'm going to
[1:25:33]
leave the pickleball court comment for my colleagues. I know
[1:25:35]
he's going to want to comment on that. Um, I'm
[1:25:38]
really excited about a lot of things here. The parking
[1:25:40]
improvement for that area, the outdoor washroom that is going
[1:25:43]
to be accessible without having to go inside the building.
[1:25:45]
Amazing. The planning for shade. This is going to add
[1:25:50]
so much for, I mean, not just pomoarts, but our
[1:25:53]
seniors, our youth. I really want to see a community
[1:25:55]
garden here. I was so glad to see that included
[1:25:57]
in the latest iteration. Thank you for that. Um, and
[1:26:01]
I want to recognise that, you know, the reason why
[1:26:05]
we're seeing a different, um, iteration here tonight of 39,
[1:26:09]
000 square feet versus 30 is because of all the
[1:26:12]
engagement that's taken place, this is, this is a design
[1:26:15]
that has evolved over time. And this is why you've
[1:26:17]
come back to us tonight and said, we need additional
[1:26:19]
funds because now we're looking at a 39, 000 square
[1:26:22]
foot, um, for changes. We need a traffic study. The
[1:26:26]
public engagement that you mentioned tonight has specifically brought up
[1:26:29]
issues that hadn't been thought of before, which is the
[1:26:32]
point of public input. It's literally a beautiful thing that
[1:26:35]
has happened here. Um, we're going to be, this, this
[1:26:38]
community centre is going to be meeting the needs not
[1:26:41]
just now, but in the future. Um, so yeah, I'm
[1:26:45]
obviously very excited. I do want to acknowledge that there
[1:26:48]
have been some, um, uh, criticisms from members of the
[1:26:52]
public who don't want us to build this and or
[1:26:54]
want us to save it until the next council or
[1:26:57]
want us to just patch the roof instead. And to
[1:27:03]
that I say this has come so far in such
[1:27:07]
a long period of time. And I'm really happy with
[1:27:10]
the work that's been done so far. And I think
[1:27:12]
we should proceed. And I'm happy to proceed. I have,
[1:27:15]
I have great trust in staff. The one thing I
[1:27:18]
will say from my own perspective and having spent a
[1:27:21]
lot of time at the new moody elementary is what
[1:27:24]
will be important here going forward is, um, managing the
[1:27:27]
budget and sticking to it. Um, I was really, really
[1:27:30]
impressed with the work done at Moody Elementary. They had
[1:27:34]
a budget. They stuck to it. It was delivered on
[1:27:36]
time. And, um, on budget. And so it can be
[1:27:41]
done. So once I realised we're only at a class
[1:27:44]
D estimates at this at this time, but, um, I
[1:27:47]
really will be looking for that for Council to be
[1:27:51]
really, really tough on the budget when the time comes.
[1:27:53]
But overall this looks wonderful. I'm very excited. I believe
[1:27:57]
my colleague is going to, um, make a motion arising
[1:28:00]
or perhaps amend the emotion, um, with regards to, um,
[1:28:03]
an idea regarding Pomar arts. And I look forward to
[1:28:07]
that. Um, but just overall, thank you so much. This
[1:28:10]
is very exciting. Thank you, Councillor. We will go to
[1:28:13]
Councillor Delworth. Thank you. First of all, I want to
[1:28:17]
say I love the building. The use of windows and
[1:28:20]
woods just absolutely, um, transforms that space. I'm really excited
[1:28:26]
about the, uh, both the internal and the external programming
[1:28:29]
space that's available. And I can remember the very first
[1:28:33]
strategic planning session that this Council had. And we talked
[1:28:37]
about things that we wanted to see done in our
[1:28:40]
term. And the revitalization of Kyle Centre was top of
[1:28:46]
the list of many other items. But it was up
[1:28:49]
there. It was, it was certainly up there. And I
[1:28:52]
want to say what we're doing here is we're taking
[1:28:55]
a 47 year old building. And transforming a building into
[1:29:00]
what we can see now is a very unique Kyle
[1:29:04]
district with significant new park space with significant new opportunities.
[1:29:09]
And I think that is just a part of the
[1:29:12]
evolution of that side of the city. And certainly in
[1:29:15]
moody centre, giving the residents of Moody Centre a really,
[1:29:19]
really, um, expansive gathering space. I'm very happy. And, you
[1:29:27]
know, reading through all the engagement summaries, I'm seeing the
[1:29:30]
lot of other, uh, people in this community that are
[1:29:33]
quite excited about this. Um, I do note that there
[1:29:37]
will be another consultation with the community. I have two
[1:29:41]
questions, if I may. The first question is, can through
[1:29:47]
to staff, can you please remind me if this building
[1:29:50]
is going to be constructed to any of the environmental
[1:29:53]
standards, whether it's a lead standard, whether it's the Rick
[1:30:01]
Hanson accessibility standard, programs, are we actually building this to
[1:30:05]
any of those standards, whether we're applying for the designation
[1:30:08]
or not, because I know we can build it to
[1:30:10]
the standards without actually applying for the designation. Can you
[1:30:14]
remind me where we're at? Yes, through the chair, we're
[1:30:17]
targeting lead gold standard in terms of sustainability. And Rick
[1:30:23]
Hanson Gold in terms of accessibility and inclusion. We must
[1:30:27]
be coming pretty much up there as a, as a
[1:30:30]
leader in terms of, uh, the level of sustainability mitigation
[1:30:36]
that we've done on, on a number of our recent
[1:30:39]
buildings. My last question is really nice pictures. And I
[1:30:43]
think we've had this discussion before. Very nice pictures of
[1:30:46]
the external spaces. And we know trees will grow. But
[1:30:51]
in terms of, uh, mitigating any heat dome effect with
[1:30:54]
that much open space there. I know we've talked about
[1:30:57]
potentially using different shade canopies to be implemented as well.
[1:31:03]
Can you speak further on that? So we have started
[1:31:06]
considerations of those things. But, uh, as we move to
[1:31:11]
design forward, there will be further considerations in terms of
[1:31:14]
additional tree locations to provide natural canopy. And in the
[1:31:18]
outdoor spaces, um, we will continue to look at potentially
[1:31:24]
something similar in the plaza area. Great. I guess my,
[1:31:28]
my last comment is I cannot wait to, uh, have
[1:31:33]
the community at the ribbon cutting of this event. And
[1:31:37]
with the knowledge that this building is going to supersede
[1:31:41]
47 years and our residents will be using it for
[1:31:45]
at least 50 years into the future. And I think
[1:31:47]
what we're, what we're proposing here is exactly what that
[1:31:50]
community has asked for. And, uh, what we're providing. Thank
[1:31:54]
you. Thank you, Councillor. Councillor Lubeck. Thank you so much.
[1:32:02]
Um, first, um, not to steal anything from my, my
[1:32:04]
colleague, but I really like how we're measuring Jim's in
[1:32:06]
pickleball courts now. Um. I very much also appreciate that
[1:32:12]
staff are addressing the concerns that we've heard come up
[1:32:15]
through public employed, especially around safety. So it's really, I
[1:32:20]
just really appreciate when that can be integrated. And I
[1:32:24]
know we do our best to integrate where we hear
[1:32:26]
from the public. Um, going back through not only the
[1:32:30]
first input session, but the most recent one, but the
[1:32:35]
first one, I really liked how some of the questions
[1:32:37]
have been framed. What we're trying to achieve here, like,
[1:32:41]
how do you want to feel when you enter the
[1:32:43]
space. And so many questions around inclusion for different user
[1:32:48]
groups. So I really want to say how much I
[1:32:51]
appreciate that. And we got so many wonderful ideas from
[1:32:54]
the community as well as from our advisory groups. Um,
[1:32:58]
and I do love the design. It's also very interesting,
[1:33:01]
but also in a biophilic architecture. So, you know, Billy
[1:33:05]
fits in with the area and blends in with the
[1:33:08]
nature. Um, I think this is really important for our
[1:33:12]
community. Um, I was looking back some of the recommendation
[1:33:16]
surveys and about we need more space. Even now, even
[1:33:22]
if we don't grow, we need more programmable space. And,
[1:33:25]
and I appreciate that, you know, this is an investment
[1:33:28]
in our community. But even if we were to try
[1:33:33]
to patch up Kyle Centre right now, functionally, it doesn't
[1:33:36]
meet our needs. There's a lot of different programming that
[1:33:41]
we need for seniors, for arts. Um, for gymnasium spaces.
[1:33:46]
And it reminded me also of the conversations we've had
[1:33:49]
about our, um. Our civic facilities studies. And that intergenerational
[1:33:56]
equity. Like in the fact that we need to be
[1:33:59]
investing for future generations, not just for today. We know
[1:34:04]
what it was like to now be thinking about rebuilding
[1:34:07]
our library when it was almost a capacity when it
[1:34:09]
was, uh, finished as much as we love the library.
[1:34:14]
You know, we should have been looking forward more when
[1:34:16]
we built that. So I do hear the concerns about
[1:34:19]
costs that it came up from some folks, um, and
[1:34:22]
we don't have a conclusion exactly of what that's going
[1:34:24]
to look like as far as the balance of ACCs
[1:34:27]
and DCCs and borrowing. Um, but I think it's also
[1:34:30]
important to remind folks that, um, there are grant programs
[1:34:34]
that are coming up now from the federal government, um,
[1:34:37]
like Bill Canada Strong, which also looks at matching funding
[1:34:40]
from the province. And being able to have things that
[1:34:43]
our shovel ready is that's when they want to actually
[1:34:45]
build them. So, you know, I appreciate that folks are
[1:34:48]
worried about cost. Everything is getting harder. But our staff
[1:34:51]
are really good at getting grants and punchable their weight
[1:34:56]
when it comes to applying and actually succeeding. So I
[1:35:03]
just have a couple of considerations that I'd like to
[1:35:05]
staff to keep in mind as we go. I know
[1:35:08]
this is still early days. Um, I did love that
[1:35:11]
there is community gardens. And, you know, as Kyle campus
[1:35:14]
grows, I hope it'll be more opportunity for that. Um.
[1:35:20]
One of the things that came up from some conversations
[1:35:22]
in the community that I was part of was if
[1:35:25]
there would be an opportunity for the Jim space to
[1:35:27]
be able to convert into a performance space of some
[1:35:29]
kind. I was talking to some parents around opportunities to
[1:35:36]
minimize stimulation for those children and other participants or other
[1:35:41]
participants who may need calm reflective spaces, um, while they're
[1:35:45]
taking part in programming. Um, and as we started talking
[1:35:49]
about, um, covered areas, I know that that was a
[1:35:52]
comment that I took to heart having cover spaces in
[1:35:55]
the plaza, especially for seniors to be able to gather
[1:35:58]
and to chat, um, and to be able to use
[1:36:02]
that plaza in all, in all weather. I think that's
[1:36:04]
really important. And also my last comment is just around
[1:36:08]
the shade structures. I think that that's really important. I
[1:36:11]
appreciate that. I'll come later. Um, I think that's also
[1:36:14]
an opportunity for art pieces as well. I know I've
[1:36:17]
seen in certain, well, global communities either doing community art
[1:36:23]
projects that involve creating sales or what have you. So
[1:36:28]
just to think outside the box and fars when we're
[1:36:31]
trying to create, um, you know, the shade structures or
[1:36:34]
any other structures, if we can incorporate artistic elements as
[1:36:38]
well. That's it. Thank you. Thank you very much, Councillor.
[1:36:42]
Councillor Larbecky. Thank you. Um, so I greatly appreciate the
[1:36:48]
work that has been done. And here we are in
[1:36:51]
July ahead of October at a meeting where we have
[1:36:53]
no public input. You know, talking about spending more money
[1:36:58]
to move forward on things like just what is actually
[1:37:00]
for as part of it was described 150, 000 cover
[1:37:04]
being larger size and the planning for that, but also
[1:37:07]
traffic analysis, archaeological assessment, uh, staff and contingency. That is,
[1:37:13]
um, moving ahead on a major infrastructure project at immense
[1:37:19]
cost to our community that to be frank, I do
[1:37:22]
not understand the mandate we have on. So I just,
[1:37:26]
and that is not a comment on the design work,
[1:37:28]
anything like that. I think this is very exciting. It's
[1:37:30]
wonderful. It's come to the committees. We've had a few
[1:37:32]
open houses. Um, eventually this is going to be a
[1:37:35]
need for our community. Depending what happens in Moody Centre
[1:37:39]
to be frank, especially around the densification of that area.
[1:37:43]
But I do want to point out to the engagement
[1:37:44]
so far. Round two of engagement minors standing. It's had
[1:37:47]
about 40 people at the open house in 75 surveys
[1:37:50]
completed. Um, the round one of that total engagement from
[1:37:54]
my understanding was about just over 300 people. So I
[1:37:59]
just don't feel like the enthusiasm for marching ahead just
[1:38:02]
before an election on such a massive capital, uh, infrastructure
[1:38:07]
project could be gleamed from this, these, this input that
[1:38:11]
we've had. And the input that we did have, that
[1:38:13]
one of the top concerns was cost. It impacted taxpayers.
[1:38:16]
And that is a very legitimate concern. Um, so I'm
[1:38:21]
very fine to give input tonight. And I think that
[1:38:24]
it's, it's gone through the committees and it's a very
[1:38:26]
thoughtful design. And I feel very comfortable about, okay, we
[1:38:29]
have this now. We have a vision. We know what
[1:38:31]
we're working towards. Am I comfortable spending another 150, 000
[1:38:35]
dollars to get permitting and stuff this summer. Uh, I'm
[1:38:38]
not. And I don't think enough members of our community
[1:38:42]
are on board or even know what we're talking about
[1:38:45]
right now for me to feel comfortable with that. Uh,
[1:38:48]
so I will be calling for, for separation on this.
[1:38:51]
And I will not be supporting the increased funding. I
[1:38:55]
think regardless of who's sitting here next term, it's going
[1:38:57]
to be the next council is going to be deciding
[1:39:00]
how to proceed, what to see, what does it look
[1:39:02]
like and what the future of call centre is? And
[1:39:04]
I think there needs to be a mandate from the
[1:39:06]
public. Uh, this is kind of like discussing the icing
[1:39:09]
on a cake when we don't own an oven. Right.
[1:39:12]
It's kind of bizarre to me that we're so focused
[1:39:15]
in on, on, um, the insights of this building. And
[1:39:18]
we have no idea how we're going to pay for
[1:39:19]
this. How much is even going to cost. So I
[1:39:22]
really appreciate the work of staff. I'm comfortable where this
[1:39:26]
is at. I think we need to put a bit
[1:39:28]
of a pause. Three months won't do much except for
[1:39:32]
allow a relook at this in a new context of
[1:39:35]
what the next term will look like. So and we
[1:39:38]
can hear better from the public at that time, I'm
[1:39:40]
hoping. Thank you. Thank you. Um, Councillor Agterapp. Thank you.
[1:39:48]
Um, there was 29 pages of public like verbatim comments
[1:39:53]
that, uh, Council received and cost came up 34 times.
[1:39:57]
And I appreciate, uh, that there is concern about how
[1:40:01]
we're going to pay for this. And I also appreciate
[1:40:03]
Councillor Lubick for bringing up like the shovel ready to
[1:40:07]
get some of these grants. We need to have shovel
[1:40:09]
ready things, but also people talked about cost as like
[1:40:13]
adding more parking. So the cost benefit. So it wasn't
[1:40:18]
only concern about how we're going to pay for that.
[1:40:21]
Although I definitely hear that. I was curious about when
[1:40:26]
Kyle Centre was built, there was about, uh, 12, 000
[1:40:28]
people in Port Moody. And that works out to basically
[1:40:32]
5. 4 square feet per person. Um, and then, you
[1:40:37]
know, I guess at the time we still had the
[1:40:39]
ice sheet and the curling rank, um, and then in
[1:40:41]
2008, there was the expansion of what we have today
[1:40:45]
at the rec centre. And I'm, I moved here just
[1:40:47]
before that. And it was under construction. And now between
[1:40:51]
Kyle and, um, our rec centre, we have 175, 000
[1:40:55]
square feet, which works out to 4. 3 square feet
[1:40:57]
per person. So, um, where I'm going with this is
[1:41:00]
that, you know, we are at sitting around 39, 000
[1:41:04]
square feet, but also there was a number of comments
[1:41:06]
in there saying add another floor, build it bigger, um,
[1:41:09]
for the future. And, um, I hear that. And I
[1:41:13]
also can hear the concern about cost. So that's definitely
[1:41:16]
a balancing act. Um, I'm comfortable with the request for
[1:41:21]
148, 000. I think what staff is asking for is
[1:41:25]
very reasonable. And it will take us to the next
[1:41:27]
stage. Regardless of what happens in the election, there will
[1:41:31]
still be time to turn, you know, to turn the
[1:41:35]
ship if that is the will of the next council.
[1:41:38]
But in the meantime, I think we should still proceed
[1:41:41]
with and referencing all the positive comments and the wants.
[1:41:45]
And there. I did have a question. Um, the kitchen
[1:41:47]
that's in Kyle Centre right now, is it going to
[1:41:50]
be similar? Like it's still like a warming kitchen. So
[1:41:53]
it's, it's, we're not losing anything. I see nodding heads.
[1:41:56]
Yeah. Okay. Thank you. Um, I wrote a lot of
[1:42:01]
notes and now I've lost my spot. I like, um,
[1:42:04]
the idea of more covered spaces in the plaza. Um,
[1:42:10]
I remember during the pandemic, the covered space out here
[1:42:13]
and over to the side here was well used. I
[1:42:16]
would walk by here to return a library book. And
[1:42:19]
I would see, um, the group of seniors sitting with
[1:42:23]
their lawn chairs, you know, in a circle gathering in
[1:42:26]
an open air space, but still undercover, um, given that
[1:42:30]
we have, you know, torrential rains. Also heat domes, I
[1:42:34]
think covered spaces are going to be welcomed by many
[1:42:37]
people. Um. Quiet spaces was also another, another aspect that
[1:42:45]
I've heard as well, like needing that low stimulation space.
[1:42:50]
And the ceiling heights was mentioned, but I'm assuming that
[1:42:53]
it's appropriate for volleyball, basketball, pickleball, many uses. And I
[1:42:59]
like that we're adding another multipurpose gymnasium given the popularity
[1:43:03]
of the two, the double gymnasium that we have now.
[1:43:07]
And knowing that it can be hard for, um, people
[1:43:10]
to, there's not a lot of time just to do
[1:43:13]
drop in, shoot some hoops or play around in the,
[1:43:16]
so appreciate that we're getting another potentially getting another space.
[1:43:20]
Um, the only sort of comment that I didn't see
[1:43:23]
in, in the feedback that I would say is, um,
[1:43:26]
look for efficient construction methods, um, I know, um, mass
[1:43:33]
timber is being contemplated, but also some of the other
[1:43:35]
sort of newer construction methods like panelized that is being,
[1:43:42]
um, built off site and then just popped up. So,
[1:43:43]
um, I think that has some, some ability to minimize,
[1:43:50]
um, the construction cost, though recognising digging a hole is
[1:43:51]
probably the most costly, importing the foundation is the most
[1:43:54]
costly part of the building. So appreciate all the work.
[1:43:57]
Um, look forward to the next step and see how
[1:44:00]
this shakes out in the fall. Thanks. Thank you. Councillor
[1:44:02]
Morrison. Thank you. Um, I just want to start off
[1:44:06]
by saying thank you very much for the feedback. Um,
[1:44:08]
I really enjoyed reading the different input from our community.
[1:44:12]
And I'm also want to recognise the passion of the
[1:44:15]
community and that there is a big need for all
[1:44:18]
different levels of services and different needs that aren't necessarily
[1:44:21]
able to be delivered in Port Moody yet. Um, whether
[1:44:26]
that is the quiet spaces that my colleagues talk about
[1:44:29]
or the push for cafe social spaces, um, within the
[1:44:33]
building or seniors and quiet zones or outdoor spaces to
[1:44:37]
be able to have get togethers and stuff. I recognise
[1:44:41]
that the need for a senior facility. There's a need
[1:44:43]
for a bigger recreation facility. There's need for youth spaces
[1:44:47]
to gather. Um, there's need for expansion for our arts
[1:44:50]
community to be able to, um, utilise that programming and
[1:44:53]
the demand on those programming because they run such a
[1:44:55]
great program. So I just want to say that I
[1:44:58]
appreciate all these different angles coming. And it's very, very
[1:45:01]
hard as well when you're seeing this need to not
[1:45:04]
say, let's do it all. How can we do it
[1:45:06]
all? And, you know, 39, 000 square feet I want
[1:45:09]
to commend staff for the fact that they expanded that
[1:45:11]
size with council's direction on looking at those other needs
[1:45:16]
as well as figuring out how we can make these
[1:45:18]
spaces as multi - use as possible so that there
[1:45:21]
is the ability to transition, for example, in the evenings
[1:45:23]
to a different use or earlier in the mornings to
[1:45:25]
a different use in some of these spaces. So I
[1:45:27]
want to recognise that. Um, as far as my comments
[1:45:31]
in regards to the look of it, and I appreciate
[1:45:33]
the fact that the playground aspect of it is just
[1:45:35]
placeholders right now, um, I, I hope they remain as
[1:45:39]
placeholders and that there is a bigger discussion in regards
[1:45:41]
to playground use, um, whether there's consideration of the possibility
[1:45:46]
of a mint small water park for us cooling capabilities
[1:45:48]
or cooling centre capabilities in that area, which is very
[1:45:51]
much a heat island area of the city. Um, as
[1:45:54]
we know, Moody Centre is, um, I also want to
[1:46:00]
recognise the cost as well, as was mentioned by some
[1:46:05]
of my colleagues. And the community as well. They're worried
[1:46:08]
about this and how it's going to be paid for.
[1:46:10]
And the ton of information out in regards to that.
[1:46:13]
We're getting there. But, um, I think that that'll be
[1:46:16]
a key component. So I'm a little bit, like I'm
[1:46:18]
enthusiastic about the idea of providing such a really cool
[1:46:22]
amenity that's going to be, you know, for the future
[1:46:24]
for future residents that are coming in as well as
[1:46:27]
serving our existing community. The fact that west side port
[1:46:30]
moody is going to have a proper good size recreation
[1:46:34]
centre to be able to get to without having to
[1:46:35]
drive all the way down St. John Street to our
[1:46:37]
rec centre over here. Um, is going to massively cut
[1:46:41]
down their commute times. Um, and maybe even permit to
[1:46:44]
active transportation or, or using, um, alternative modes like buses,
[1:46:47]
et cetera. So I'm excited about that aspect of it
[1:46:50]
as well as the growth that's going to happen in
[1:46:52]
the area around it. Um, so, but the cost thing
[1:46:55]
is, is, is a moment of pause for me because
[1:46:58]
I know things can get expensive. And I am going
[1:47:01]
to be pushing very, very hard for any type of
[1:47:04]
partnerships, reduction and cost efficiencies, et cetera. As we go
[1:47:07]
through this process and those discussions happen on how we
[1:47:10]
can deliver the most, whether it's square footage wise or,
[1:47:14]
or amenities or whichever into this space for the lowest
[1:47:17]
cost possible while still, you know, following along our climate
[1:47:21]
commitment goals, but maybe not as far as what might
[1:47:25]
be, um, you know, the leaders of the entire lower
[1:47:27]
mainland, if that's going to make a big difference in
[1:47:29]
the cost. So I want to look at all those
[1:47:31]
angles on those different cost pricing to see if we
[1:47:34]
can shave five million, three million, whatever it happens to
[1:47:37]
be off the cost, but still deliver a world -
[1:47:39]
class facility that I know that our residents need. So
[1:47:43]
I'm supportive of the extra cost here. Um, I understand
[1:47:47]
that there's some potential savings in time and also potential
[1:47:52]
cause. This could be made back just in time savings,
[1:47:54]
et cetera, and being able to utilise, um, planning without
[1:47:57]
having to feel like we're rushing or taking a step
[1:48:00]
too quickly. So I can see this coming back later
[1:48:02]
on in the process. So I'm okay with this an
[1:48:05]
expenditure. So thank you for that. And those are my
[1:48:07]
comments. Thank you. Um, yeah, I'm not going to add
[1:48:10]
a lot to what was said, but I do want
[1:48:12]
to, uh, sort of emphasize some of the points that
[1:48:15]
were made. And I think Councillor Lubick really hit on
[1:48:17]
one that I was, that I think that is really
[1:48:20]
important for us to keep in mind. And that is
[1:48:22]
around the grants and the fact that, um, the more
[1:48:25]
detailed design that we get to, um, the, the better
[1:48:28]
position we will place the city in to get that
[1:48:31]
funding from the, from the federal government. So I'm, the
[1:48:35]
only other comment that I would say on that is
[1:48:36]
that the only way to find out what the cost
[1:48:39]
is, is to get those to get to that detailed
[1:48:41]
design place so that we can actually get those numbers
[1:48:44]
on the table so that we can see that what
[1:48:47]
we're dealing with. And then we, then we go to
[1:48:49]
the next step where we're figuring out, well, how are
[1:48:51]
we going to pay for this? And that needs to
[1:48:53]
come. Um, I'm, I also feel very comfortable, um, with
[1:48:57]
the increase, uh, for the reasons that we're explained around
[1:49:01]
the change in the scope and the necessity to increase
[1:49:04]
those into sort of add those things to the, to
[1:49:08]
the planning right now in order so that we can
[1:49:11]
actually capture some of the issues that the community brought
[1:49:15]
up. Um, so I'm comfortable with that. And I'm also
[1:49:18]
comfortable with the, um, utilising the funding source that staff
[1:49:21]
have recommended, which is the, uh, community amenity contribution, uh,
[1:49:28]
reserve. Um, you know, when I look at this project
[1:49:30]
and I sort of think about Kyle, the Kyle campus.
[1:49:34]
And what we're trying to achieve here, we have to
[1:49:36]
also remember that those renderings will be changed and they
[1:49:39]
will be further refined as we get into further details.
[1:49:43]
Um, and we'll be making some announcements in the area
[1:49:48]
that are going to change this almost immediately in terms
[1:49:51]
of the, um, the, I guess, how that, how that
[1:49:56]
will unfold. Um, so I'm really excited about that. Um,
[1:49:57]
but when I think about what, how, uh, area is
[1:50:03]
being used right now, I really always go back to
[1:50:05]
the art centre. And the fact that, um, the art
[1:50:09]
centre and the, um, the, the folks at the art
[1:50:14]
centre are providing, they're really the arts arm of the
[1:50:17]
city. And what we've been hearing from them as recently
[1:50:20]
as even, I think earlier this year was that they're
[1:50:23]
very, um, constrained in the space that they have. They're
[1:50:27]
very, they, they would love to be able to expand
[1:50:30]
their programming and, um, look for other ways to provide
[1:50:35]
that service to the, to the residents. Um, of Court
[1:50:38]
Booney and to partner with the city to achieve that
[1:50:42]
goal. Um, and so I always have always thought of
[1:50:46]
this building as being, um, an expansion for, you know,
[1:50:51]
as the potential for expanding, um, the facility, the art
[1:50:55]
centre facility as well. And I appreciate the, um, the,
[1:50:58]
the mention of the art space, um, at that during,
[1:51:05]
during the presentation. And, and do really feel very strongly
[1:51:09]
that we need to be, um, pushing that, um, and
[1:51:13]
really working with the art centre folks to try and
[1:51:16]
ensure that, um, we're providing the space that's required for
[1:51:20]
that increase in programming. I think that for us, it's
[1:51:23]
really, it's really going to come down to cost again
[1:51:26]
in terms of all the comments that were made previously.
[1:51:29]
We need to get to that detailed phase. And in
[1:51:33]
speaking with staff today, um, in order to assist us
[1:51:36]
in understanding, um, what that might look like, I think
[1:51:40]
that we should be giving direction at this time for,
[1:51:43]
for, um, for staff to do some analysis and some
[1:51:47]
feasibilities around, uh, what would it look like if we
[1:51:50]
allocated some space to specifically dedicate it for space for
[1:51:55]
the art centre? Um, so with that, I'd like to
[1:51:58]
move, um, the following amendment, our additional motion to what's
[1:52:04]
being presented here. And that is that staff report back
[1:52:08]
on the financial feasibility. Of allocating the second floor of
[1:52:15]
multipurpose room for dedicated space for art, centre, program expansion.
[1:52:20]
And report back, um, and to report back during the
[1:52:24]
detailed design phase. So that we can have all the
[1:52:27]
information in front of us so that we can best
[1:52:30]
understand what that, what that would look like. And we
[1:52:33]
can continue those conversations with the art centre folks, um,
[1:52:37]
and trying to integrate. And help them along in expanding
[1:52:41]
their opportunities in the city. So, um, that's been, that's
[1:52:44]
a motion that I'd like to, okay, it's been moved
[1:52:48]
in seconded. Um, thank you for that. I'll go to
[1:52:50]
Councillor Knowles. Yeah. Thank you for that Mayor. Um. This
[1:52:57]
is something I think is very important. We know that
[1:53:00]
Pomartz has outgrown its space. And it actually has so
[1:53:04]
many opportunities ahead of it. Um, for programming. And it's
[1:53:08]
actually now, we need to remember it's not for Martin's
[1:53:11]
anymore. It's pomo arts and the visitor centre. Yes. Right.
[1:53:15]
Um, they have taken on a whole new role. And
[1:53:17]
in this city and are starting to direct people all
[1:53:20]
over the city, which is really, really impressive. So, um,
[1:53:23]
absolutely support this. I think this has the potential, you
[1:53:27]
know, and this is just one more step in our,
[1:53:30]
our fully embodying the city of the arts. So thank
[1:53:32]
you for this. Absolutely support. Thank you. I think it's
[1:53:36]
important to get that information so that we come from
[1:53:38]
a place of knowledge. Councillor Dilworth, let me just speak
[1:53:43]
in support of the amendment. I think in addition to
[1:53:46]
providing additional programming space for pormon arts, what it's also
[1:53:50]
giving them a certainty. Certainty in knowing that they have
[1:53:53]
X amount of space. And it can really help them
[1:53:56]
in their, both their shorter term programming and their longer
[1:53:59]
term programming. As I noted earlier, this is going to
[1:54:03]
be, this building is going to be there for use
[1:54:05]
for the next 50 years. So for promo arts to
[1:54:08]
know that they are in true partnership with the city
[1:54:11]
and they have allocated space in that building gives them
[1:54:15]
a higher level of security and certainty in terms of
[1:54:19]
their long - term strategic planning. Okay. Um, I don't
[1:54:24]
see anybody either. Oh, Councillor Morrison. Just let me copy.
[1:54:29]
Thank you. Um, I appreciate the, uh, amendment Mayor Latti.
[1:54:31]
I think that this information is good information to have.
[1:54:35]
Um, and also figuring out the costing, et cetera, around
[1:54:38]
that as well. Um, we know that providing space for
[1:54:42]
any community group has an expense to it. And it
[1:54:45]
subsidized by the city and the taxpayers, et cetera. And
[1:54:47]
I know that they put on awesome programs. So I'd
[1:54:50]
love to know more about, um, about not only the
[1:54:53]
cost of delivering this as a consistent space, um, to,
[1:54:57]
to this, this group, but also, um, you know, the
[1:54:59]
amazing things they're thinking about coming forward as, as part
[1:55:02]
of that extra space, if they got that, would that
[1:55:04]
be also part of this where they would talk it
[1:55:06]
all about that? I think that that would be something
[1:55:08]
that the art centre would have to take away. And
[1:55:10]
I, and I wouldn't presume that they would know right
[1:55:14]
away. They're, they're going to have to determine from a
[1:55:16]
business case for themselves if that's, you know, what I
[1:55:21]
hear, what I've heard from, um, the art centre is
[1:55:25]
that, um, they need to know, like, if, if, um,
[1:55:30]
how many square feet they're talking about and what, what,
[1:55:32]
what that would look like. So I think we want
[1:55:34]
to be able to provide that to them so that
[1:55:35]
they can, so that they can go back, go away
[1:55:38]
and do some and cringe some numbers and figure out
[1:55:42]
what their plan might look like. Um, this is just
[1:55:45]
a starting place in order to try and get that,
[1:55:49]
those conversations going. Um, it's really important for us. Because
[1:55:55]
any space that's in there that's built. And if it's
[1:55:58]
dedicated to a specific, if it's not being used by
[1:56:03]
the general public, then the rest of the space needs
[1:56:06]
to sort of make up for that. So we need
[1:56:08]
to look at how we're going to, to pay for
[1:56:11]
that as well. So I think it's really important that
[1:56:13]
we get everything on the table so that we know
[1:56:15]
exactly what we're doing. And so as part of this,
[1:56:17]
there would also be some discussion about perhaps needs within
[1:56:20]
that space for them, whether it's ventilation or, um, I
[1:56:25]
would hope so. Et cetera stuff like that. You know,
[1:56:26]
and it may be too early to get to those
[1:56:29]
types of conversations for them. But, um, just from a
[1:56:34]
financial feasibility, if, if we're building that space and, you
[1:56:37]
know, what would that look like for the city? Yeah.
[1:56:41]
Cause some of those things are key equipment that they
[1:56:44]
would have to consider. And, um, just with what those
[1:56:47]
conversations to happen between staff and the arts centres. So
[1:56:50]
that way they can say this is the space that
[1:56:52]
you were looking at. What do you need in this
[1:56:53]
space to be able to do it so that way
[1:56:55]
that's a full part of that? We may, we may
[1:56:57]
not get to that detail, uh, level of detail, but
[1:57:00]
we need to know whether, what the cost for the
[1:57:02]
city is for that type of a space to be
[1:57:04]
allocated somewhere else. Okay. Thank you very much. Thank you.
[1:57:11]
Um, okay. And I don't see any other hands. So
[1:57:13]
I'm going to call the question on the amendment all
[1:57:15]
in favor. Opposed carried. Now we're going back to the
[1:57:20]
main motion. I think everybody has spoken to this. So
[1:57:22]
I'm going to call the question on the main motion,
[1:57:24]
all in favor. Oh, the separation councillor. I'm sorry. Forgive
[1:57:28]
me. Sorry. So we'll go on the first part, which
[1:57:31]
is the providing the, of the feedback. All in favor.
[1:57:37]
Opposed carried. The second part is the additional 148, 000
[1:57:41]
for the scope change. All in favor. Opposed Councillor Larbecki
[1:57:46]
is opposed. On the third part of the motion, all
[1:57:49]
in favor. Opposed carry unanimously. Thank you. All right. Thank
[1:57:54]
you everybody for that. Uh, we'll move to the next
[1:57:57]
item on the agenda, which is 11. 4. The suiter
[1:58:01]
broke traffic improvement plan update request. I think that we
[1:58:06]
are looking at having a staff presentation on this. Oh,
[1:58:16]
Mr. Moye. I'm sorry. My bad. And I also, I
[1:58:20]
will note that, um, we have, uh, representative from Ani
[1:58:24]
in the audience. And if Council wishes to ask that
[1:58:28]
individual, any questions, um, with leave of Council, we can
[1:58:31]
invite them up to answer questions. Um, Mr. Moy. Through
[1:58:34]
the chair, it's not a, it's not a presentation, but
[1:58:36]
just a brief summary. The city and Ani have been
[1:58:39]
working together to implement traffic improvements in Sutter Brook over
[1:58:41]
the past several years. Um, the report, uh, that's in
[1:58:44]
the agenda package outlines a scope change, which would help
[1:58:47]
getting, get the remaining work done. So Ani's provided some
[1:58:50]
rationale for the change. And staff support this change in
[1:58:53]
consideration of the high impacts of the original scope of
[1:58:55]
work. There was, uh, there was the one way conversion,
[1:59:00]
which was done by the city. And then there's been
[1:59:01]
some addition of raise crosswalks. Um, the remaining work is,
[1:59:08]
is some intersection, um, changes at, at Murray and Morrissey.
[1:59:09]
And then particularly creating raised intersections along Morrissey, uh, Brew
[1:59:14]
and Sutterbrook way. Um, which from, from, from what we've
[1:59:18]
seen, uh, they require significant drainage changes. You have to
[1:59:22]
dig up the whole intersection, uh, rebuild it at a
[1:59:24]
slightly higher elevation, rebuild the curbs. And so you'd be
[1:59:26]
closing roads. Um, for, for long periods and potentially actually
[1:59:30]
just closing all of the roads, uh, for each intersection.
[1:59:32]
So I think it could be a long disruption. Um,
[1:59:35]
our view is changing the scope as outlined will address
[1:59:38]
the general traffic improvement goals. Um, that we've set out
[1:59:41]
to achieve with less disturbance. There may not be as
[1:59:44]
much of the aesthetic quality, but they would still be,
[1:59:50]
um, usable and anesthetically pleasing and serve the public. And
[1:59:52]
it would also ensure the work can be completed in
[1:59:54]
a shorter time period as I'm aware that residents in
[1:59:56]
the neighbourhood are looking forward to the work being, uh,
[2:00:00]
implemented and completed. What kind of feedback have you gotten
[2:00:03]
from the community in Suderbrook with regards to the proposed
[2:00:09]
changes? Through the chair that this, um, there is, that
[2:00:14]
may be something that, that, that, uh, the representatives from
[2:00:17]
Anime able to speak to better, um, this is something
[2:00:20]
where we've certainly had a lot of, um, or several
[2:00:22]
questions from residents as to the status of the work.
[2:00:25]
Um, but not so much, uh, on the details of
[2:00:28]
this change because this has been something that we're, we're
[2:00:30]
just looking at now. I know that the letters from
[2:00:32]
businesses, um, supporting this change in the, in the package
[2:00:37]
that Omni presented. And, um, lastly from my perspective, just
[2:00:39]
a question, um, if these changes that are being proposed,
[2:00:43]
um, they are different than what was approved, um, previously.
[2:00:49]
And I will, um, accept the rationale that some of
[2:00:52]
the, that the improvements that were made, um, immediately have
[2:00:56]
actually, um, had a significant impact. And if these changes
[2:01:03]
do not result in a significant, um, improvement, um, would
[2:01:10]
there be an opportunity to revisit some of the proposed
[2:01:13]
previously proposed changes? Through the chair, I think, um, like
[2:01:20]
this, this, this project also fulfills a development requirement, um,
[2:01:24]
from Ani. It was originally meant to be a traffic
[2:01:26]
signal at Capelano. That got changed to a traffic calming
[2:01:28]
plan. Um, and we scoped it this way. So, um,
[2:01:32]
we're holding a security to make sure that the, um,
[2:01:34]
that the work gets done in some form. Um, I
[2:01:38]
think it would be difficult if we complete an alternate
[2:01:41]
scope of work to go back and add more on
[2:01:43]
again. But I think the, the, the aspects that are
[2:01:48]
being changed would, I think those changes are going to
[2:01:51]
be more, um, aesthetic and of a different quality. But
[2:01:54]
I think the general function of traffic calming and, um,
[2:02:01]
and reducing that that is going to result in a
[2:02:03]
significant enough improvement from a technical perspective, yes. Yeah. Okay.
[2:02:10]
Uh, Councillor Agtrapp. Thank you. Um, since this is my
[2:02:11]
neighbourhood, I get a lot of questions about this as
[2:02:13]
Mr. Moye knows. I've also asked him. Um, I appreciate
[2:02:18]
that this is going to move ahead and that there's
[2:02:21]
going to be the 30 kilometer signs and some additional
[2:02:24]
speed humps. I'm curious that I walked around this neighbourhood
[2:02:28]
with residents that have, um, accessibility challenges and use, use
[2:02:34]
accessibility devices. And one of the challenges that is sort
[2:02:38]
of ongoing is the BRICS. And if they, um, are
[2:02:42]
broken, um, or some of the curbellet downs, especially where
[2:02:46]
I see is like brew at Morrissey, um, and Suterbrick
[2:02:49]
at Morrissey, those intersections and the curves. And I'm hoping,
[2:02:52]
and maybe staff can confirm that, um, through this work,
[2:02:56]
those challenges will be addressed. Through the chair, I may
[2:03:02]
have to, I mean, if, if there is real accessibility
[2:03:06]
issues or trip hazards, um, there's a, there's a division
[2:03:10]
in the property line. So some is on the city
[2:03:12]
side, which we need to take care of. And some
[2:03:14]
is on the, um, the Cetterbrook side, which Ani would
[2:03:18]
take care of. So, um, I mean, we'll certainly inspect
[2:03:20]
that and improve any sort of changes before we put
[2:03:23]
down fresh paint on, on that. Okay. That's great. I
[2:03:27]
think, um, right now, like having travelled through that area,
[2:03:30]
and I can talk to you later, is there about
[2:03:32]
50 - 50, some's on ours and thumbs on the
[2:03:34]
other side. So, um, I just hope that those get
[2:03:36]
addressed as work continues through here, especially when you're missing
[2:03:42]
like parts or their damage. It becomes challenging for some
[2:03:47]
people to navigate that area. But I'm looking forward to
[2:03:50]
the completion of this. Thanks. Thank you, Councillor Councillor Larbecki.
[2:03:57]
Thank you. Um, yes, we get, yeah, a lot of,
[2:04:00]
uh, feedback, input concerns over traffic issues and accessibility mobility
[2:04:04]
issues in this neighbourhood. I guess I have a question
[2:04:07]
maybe through to probably Mr. Moye, but how, how do
[2:04:11]
we get here, I guess? So this development is what
[2:04:14]
about 15 years old. How does a development get approved
[2:04:17]
that ends up having this substantial level of traffic issues
[2:04:22]
in it? Because I think that's on, you know, you
[2:04:25]
hear from people, like how did this, what's going on?
[2:04:27]
How this happened? So have things changed. Do we have
[2:04:31]
better planning rules now? I'm just wondering if staff could
[2:04:34]
maybe let the public know what their answer to that
[2:04:37]
question might be. Sure. Through the chair, I can take
[2:04:42]
a shot at it. I think something that's changed that
[2:04:46]
actually made a difference when we first went out, we
[2:04:50]
started to hear these concerns about Sutterbrook Village. A lot
[2:04:53]
of it was around circulation. So, um, pick up and
[2:04:56]
drop off. It was, it was loading for commercial. Uh,
[2:04:59]
they didn't have any space for loading. Um, and it
[2:05:02]
was a lot of, uh, like shopping for parking. We
[2:05:05]
call it like drivers going around trying to find service
[2:05:08]
parking. Parking was free on the surface. It was, you
[2:05:10]
know, there was some time limited, but that's what they're
[2:05:12]
looking for. They didn't want to go into the park
[2:05:13]
aid or they couldn't didn't know that there was a
[2:05:16]
parcade there. Um, and so a lot of the changes
[2:05:18]
from a circulation point of view, we think have, um,
[2:05:20]
that we've put in have made a difference. So I
[2:05:23]
think that's probably that lesson learned is making some of
[2:05:26]
the roads one way. And then changing the parking, um,
[2:05:29]
the parking regulations to provide, um, specific loading zones, uh,
[2:05:35]
which we didn't have before. Um, and then different time
[2:05:39]
limited zones as well as the addition of pay parking,
[2:05:42]
I think has helped with providing that surface parking availability
[2:05:45]
and also helping to drive some of those, uh, vehicles
[2:05:48]
go to go down to, um, the parcade. Another issue
[2:05:51]
which is being addressed by the plan proposed here is,
[2:05:54]
um, there was a, there was a, an architectural feature,
[2:05:58]
which was the paver, um, roads. And the original intersections
[2:06:02]
were actually meant to be raised intersection. So a lot
[2:06:05]
of the treatment was focused on having different kinds of
[2:06:07]
pavers to show, um, show where the walking areas are.
[2:06:11]
Um, but the pavers, it is actually because of the
[2:06:14]
way the roads have sort of either because of the
[2:06:17]
pavers have faded or because there's less raised features. Um,
[2:06:21]
it is, it can be hard to identify the exact
[2:06:24]
crosswalk location. So this would also add, um, industry standard
[2:06:29]
or Canada, um, standard, uh, crosswalk markings, which I think
[2:06:34]
would help with that. Okay. Thank you for that. So
[2:06:37]
some changes in what we're doing in some lessons learned.
[2:06:40]
And, you know, obviously I remember our conversation on Spring
[2:06:43]
Street and whether it's to be one way or not.
[2:06:46]
And, um, just, you know, something to reflect on in
[2:06:50]
terms of our lessons learned. And we're talking about new
[2:06:52]
developments that we kind of don't repeat the same mistakes
[2:06:55]
so we can have functional traffic and walkability in the
[2:06:59]
neighbourhoods. We claim we're building coasts. They're so walkable. So
[2:07:01]
I think this needs to get done. I mean, if,
[2:07:03]
if this is the best way for, then fine. It
[2:07:06]
just needs to get done. So thank you. Thank you,
[2:07:08]
Councillor. Somebody want to move the motion. It's been moved
[2:07:13]
in seconded. Is there an, is there any desire to
[2:07:15]
hear from, um, a representative for Moni. Nope. Okay. You're
[2:07:20]
off the hook. Um, then I will call the question.
[2:07:23]
It's been moved and seconded all in favor. Opposed Carry
[2:07:26]
unanimously. Thank you. Um, next item is committee appointments. Oh,
[2:07:31]
oh, sorry my bad. The on table that this goes
[2:07:35]
back to Mr. Uh, Mr. Moe again. Okay. So there
[2:07:40]
is a recommendation and perhaps Mr. Moe, you can give
[2:07:43]
us a quick update on where this is coming from
[2:07:47]
and why it's here now tonight. Sure. Um, through the
[2:07:51]
chair, I'm sorry that this was, uh, put on table.
[2:07:53]
We were made aware of a grant program on July
[2:07:56]
13th in the deadline to apply a September 4th. So
[2:07:58]
this is the last Council meeting before that deadline. So
[2:08:00]
we needed to provide an ontable memo to seek approval
[2:08:03]
if Council wants us to make an application. Um, this
[2:08:05]
is a federal transport candida grant for rail, um, rail
[2:08:11]
for a rail safety improvement program. Um, we have done
[2:08:15]
work to explore whistle cessation, what work would be necessary
[2:08:19]
for the Murray Street crossing of the CPKC spur line.
[2:08:23]
This grant program does not cover whistle cessation, but it
[2:08:26]
does cover safety improvements. And in order to ask for
[2:08:29]
whistlecization, you need to improve that railway to high level
[2:08:32]
of safety. So what we'll be doing is applying for
[2:08:35]
the safety improvements, um, at Murray Street and for the
[2:08:39]
Trassolini Field Crossings, which would then allow us in the
[2:08:41]
future to ask for whistle cessation. The total project costs,
[2:08:44]
a high level estimate is 400, 000 dollars. And this
[2:08:47]
grant would cover 80 percent of the cost, which is
[2:08:49]
why we thought we should re ask. Um, it's a
[2:08:51]
three year funding program. So this would be our chance
[2:08:53]
to apply for that three years. Um, I should be
[2:08:56]
clear about whistle cessation, um, on the spur line is
[2:09:00]
that if we were to do all of this work,
[2:09:03]
uh, the whistle cessation was accepted by the, by the
[2:09:05]
railway, it would stop whistling, um, at the Murray Street
[2:09:08]
and the Traselini crosswalk, or sorry, crossings, but, um, but
[2:09:12]
whistling would still be necessary for their long, um, the
[2:09:15]
spur line. Continuing whistle satisfacing along there would have a
[2:09:19]
high cost include include even needing to add bells and
[2:09:22]
whistle warning or sorry light and bell warnings at some
[2:09:27]
of the roadway crossings along there, which could also have
[2:09:29]
impacts on the neighbourhood. So we're not recommending that, um,
[2:09:31]
that the city would consider, um, expanding the program that
[2:09:35]
far. Um, and also the way that we're suggesting is,
[2:09:39]
is that the city does not get this grant that
[2:09:41]
we would just return the funds to the reserve. Um,
[2:09:43]
the total that we would ask for to commit to
[2:09:46]
this would be 90, 000 dollars with 10, 000 dollars
[2:09:48]
being to apply for the grant. Okay. Thank you very
[2:09:51]
much. Um, for that explanation, Councillor Agtra. Thank you. I'd
[2:09:55]
like to move the recommendation. Second. Okay. It's been moved
[2:09:57]
in seconded. And then I think this is also a
[2:10:00]
good example of where we've already done work and we're
[2:10:02]
able now to jump on a grant, um, at the
[2:10:05]
last minute. So appreciate, um, staff in making that happen.
[2:10:10]
Thanks. Thank you so much. Um, Councillor Morrison. Thank you.
[2:10:13]
I appreciate as well the explanation there. Mr. Moye in
[2:10:16]
regards to the other areas. Cause we all know that,
[2:10:19]
uh, down in the Pleasant side neighbourhood, et cetera, that
[2:10:21]
they, uh, an older side would love to have those,
[2:10:24]
um, horns and whistles stop. But the fact that the
[2:10:28]
option is, you know, four minutes or three minutes long
[2:10:30]
of Bel's ringing, um, might not be the preferred option.
[2:10:34]
So then at this time, but I hope that in
[2:10:37]
the future, if there ever is, the ability to, um,
[2:10:41]
upgrade those, those intersections and stuff to make that with
[2:10:43]
gates or whatever needs to be done to help it.
[2:10:45]
I would, I would enjoy that conversation for that community.
[2:10:52]
Um, but, uh, in this, in this neighbourhood to be
[2:10:52]
able to get those, too, Mon Murray and behind Traslaney
[2:10:55]
Field, I think would be a great option. So the
[2:10:56]
fact that it's, even though we're paying for upgrades to
[2:11:00]
help stop whistles at the end, uh, I don't think
[2:11:06]
we should have to pay any of it to try
[2:11:07]
to get that to stop and should be a fully
[2:11:09]
covered by the government, um, I'm happy that at least
[2:11:11]
80 percent is covered. So thank you. Thank you. So
[2:11:14]
it's been moved and seconded. I'll call the question all
[2:11:16]
in favor. Opposed, Carrie, thanks so much for bringing this
[2:11:19]
forward tonight, Mr. Moe. Now we're going to go to
[2:11:22]
committee appointments. And. Earlier this evening council approved the following
[2:11:32]
appointments to the youth focus committee. And, uh, those will
[2:11:41]
be, and those individuals will be notified of their, uh.
[2:11:46]
Membership of this youth focus committee. Shortly. No, it's already
[2:11:53]
been done. So, um, I do not want to read
[2:11:56]
all of those names. I'm afraid I might not do
[2:11:59]
a very good job of it. So, uh, but we
[2:12:02]
will be notifying the new members. Momentarily within the next
[2:12:07]
few days. All right. And next item is Council Verbal
[2:12:11]
Reports. Councillor Knowles. Thank you, Mayor. Um, I'll, I'll be
[2:12:17]
brief. This is our last meeting before our, um, August
[2:12:20]
break. So I just wanted to quickly, um, shout out
[2:12:23]
a few events happening in August. Um, for our residents,
[2:12:27]
um, coming up August 1st, we've got celebrate BC at
[2:12:30]
Rocky Point Park. This is our first annual, but hopefully
[2:12:33]
more coming forward. I'm really looking forward to seeing this
[2:12:36]
for the first time at our signature park. Um, you
[2:12:40]
know, in addition, we've got the art outside opening on
[2:12:45]
August 7th. Poem, that's Pomords outside opening. That's going to
[2:12:48]
be seven day festival. Um, where art fills the streets
[2:12:52]
really looking forward to that. We have Car Friday on
[2:12:59]
August 16th. And then a bunch of smaller items that
[2:13:03]
I'm going to leave to my colleagues, but I think
[2:13:05]
those are the big ones. And I really hope to
[2:13:07]
see a lot of residents out, um, out and enjoying
[2:13:09]
those. The other thing I wanted to say is, um,
[2:13:17]
a Councillor expressed today, you know, why are we, why
[2:13:17]
are we doing this work three months prior to an
[2:13:21]
election? And I just wanted to say that as a
[2:13:23]
sitting councillor, um, I will always do the job that,
[2:13:27]
um, I agreed to do, um, regardless of whether it's
[2:13:31]
the last three months of my term or the first
[2:13:32]
three months of my term, our job is our job.
[2:13:35]
And, um, whether or not an election is coming. I
[2:13:38]
don't believe that that should ever affect our decisions or
[2:13:41]
judgments while we're at the table. We were elected for
[2:13:43]
a purpose. And I think it's important that we keep
[2:13:45]
in mind that we are expected to do our jobs.
[2:13:47]
And, um, I'm proud that we did that tonight. Thank
[2:13:51]
you. Thank you, Councillor. Councillor Dilworth. Of course, Councillor Knowles
[2:13:56]
had the three events that I have on my list
[2:13:59]
as well. But I want to speak a little bit
[2:14:01]
more about art outside, which is launching next Friday, August
[2:14:07]
7th. And it's opening with, it's opening over in Pioneer
[2:14:12]
Park. And there will be artists painting a community piano.
[2:14:17]
For the park. And also painting those really, really big
[2:14:23]
andironic chairs that you see throughout. So that is sort
[2:14:26]
of the big first event that's taking place. And I'm
[2:14:28]
really looking forward to it. And, um, uh, a few
[2:14:32]
of us live in Newport Village. And I remember the
[2:14:34]
last arts outside, you know, every day, you know, you
[2:14:38]
could see, you could see magicians. You could see people
[2:14:42]
all out in their patios listening to musicians, um, with
[2:14:46]
or without instruments. It was just really, really well accepted.
[2:14:50]
And it helped bring some of the neighbours together and
[2:14:53]
gather well listening to those musicians. Uh, Carpe Day is
[2:14:56]
August 16th. That's going to be great. Um. BCD, we've
[2:15:03]
already covered that one. As the last meeting of the
[2:15:05]
summer, you know, I've been reading a lot of warnings
[2:15:08]
about whether events and whether it's floods out in the
[2:15:11]
valley, wildfires in the centre of our province. I think
[2:15:15]
in the lower mainland, one of the most impactful is
[2:15:18]
heat domes. And I would just encourage everybody, you know,
[2:15:22]
check in on your neighbours. Check in on your families.
[2:15:25]
Certainly the city does provide cooling opportunities through a missed
[2:15:30]
tunnel in some of our parks or opening up city
[2:15:33]
hall gallery for people to gather in heat tempered space.
[2:15:38]
But this is a, watch your pets, watch your neighbor's
[2:15:43]
particularly seniors who might be more vulnerable or isolated or
[2:15:47]
not knowing where to get support. So I want everyone
[2:15:51]
to have a really safe. Yet happy summer. Thank you
[2:15:57]
very much. Councillor Morrison. All right. Um, so, um, yes,
[2:16:06]
happy summer to all my colleagues. Thank you again for
[2:16:09]
an awesome first, oh, two thirds of the year at
[2:16:12]
this point, uh, by the time we come back, um,
[2:16:15]
September 22nd will be our next meeting because we actually
[2:16:18]
have UBCM convention that, um, some of us are going
[2:16:21]
to be attending to advocate on behalf of our community.
[2:16:27]
Um, and also partake in some of the info sessions,
[2:16:29]
LMLGA was when I attended earlier this year, I didn't
[2:16:31]
do FCM. But some of them are really good topics
[2:16:34]
on how to, you know, further public engagement or different
[2:16:37]
ideas that other communities across BC, because this is all
[2:16:40]
the British Columbia Municipalities have to solve regional issues or
[2:16:45]
local issues that they might have encountered. So I'm looking
[2:16:48]
forward to attending that. And I believe a few of
[2:16:50]
my colleagues will be there as well. Um, and I
[2:16:53]
will be, um, letting people know as I go throughout
[2:16:55]
that, that program, you know, what's kind of coming up
[2:16:58]
or what's been discussed in some of these things. And
[2:17:00]
we also get to vote and advocate for our motions
[2:17:02]
that we're also, um, very passionate about. Um, I also
[2:17:07]
wanted to mention that, um, when we do reconvene, uh,
[2:17:10]
as we know, we're in an election period now officially.
[2:17:14]
And, uh, we'll have the full list of all the
[2:17:16]
candidates that are going to be running, um, for mayor
[2:17:21]
school board or council. And that'll all be finalised by
[2:17:24]
the time we return. So I just want to encourage
[2:17:26]
everybody out there that's either going to be meeting or
[2:17:28]
the candidates or thinking about running themselves to look into
[2:17:32]
it. Uh, there's information on the city website about it.
[2:17:35]
Having a good variety of different perspectives and different visions
[2:17:38]
is always wonderful. And I encourage, um, people to participate
[2:17:43]
in that process as much as possible. And get out
[2:17:45]
and vote eventually. But to get engaged because, you know,
[2:17:48]
you need to ask those tough questions of myself or
[2:17:51]
any of the candidates running and hopefully they'll have a
[2:17:54]
vision on how they're going to deliver on their vision
[2:17:56]
as well. So I encourage everybody, please get to know
[2:17:58]
your candidates and support. Whomever you'd like in that, uh,
[2:18:01]
in that race. Other than that, I'm heading off to
[2:18:05]
the Okanagan for a few days for my father's retirement.
[2:18:07]
So happy retirement to my dad after 45 years at
[2:18:11]
the same sawmill. So it will be a very, very
[2:18:15]
happy day for him to get a chance to retire.
[2:18:18]
So congratulations dad on that retirement. Great. Thank you everyone.
[2:18:22]
Thank you for that. Councillor Lubick. Thank you so much.
[2:18:26]
Um, yeah, echoing Councillor Morrison, I'm excited for UBCM. And
[2:18:30]
also the opportunity to talk to hopefully ministers and ministerial
[2:18:33]
staff and advocate directly. For what we need. And I
[2:18:39]
do want to give a shout out as Councillor Dilworth
[2:18:43]
mentioned, you know, heat is a big issue right now.
[2:18:45]
And if the wind changes smoke will be as well.
[2:18:48]
We've already had a couple of air quality warnings. And
[2:18:51]
our staff do a really good job of sharing information
[2:18:54]
through the city website and letting people know who's more
[2:18:57]
vulnerable and trying to keep people safe. So I do
[2:19:01]
want to acknowledge all the work that staff do. Um,
[2:19:04]
and last I just want to share a couple of,
[2:19:08]
um, other events that the folks haven't mentioned yet. I
[2:19:12]
know it's unbelievable. There aren't. There are still a couple,
[2:19:15]
but I'm excited for nest building in Bienen. Nest building
[2:19:21]
and component near park is part of art outside, but
[2:19:23]
it's going to be, um, natural weaving and teaching people
[2:19:25]
how to do that. So we're going to make a
[2:19:27]
community nest. And I'm very excited about that. Um, the
[2:19:32]
eighth. Yeah. Um, that's August 8th. Uh, this week, pomar
[2:19:37]
arts has a, uh, art uncorked event again. So wine
[2:19:41]
and art pairing. This has become one of my favourite
[2:19:45]
things. Uh, we have cake culture days coming up, um,
[2:19:46]
on August 9th. Or just the one day. And it's
[2:19:52]
not in Moody, but, um, tricities wide, I think. I
[2:19:57]
always love the dumpling festival. And I think it's important
[2:20:00]
to share that because that came out of an anti
[2:20:03]
- racism event, um, the organiser originally during COVID had
[2:20:08]
a terrible experience of racism. And instead of getting, I'm
[2:20:12]
sure she'd get upset at first, but then she decided
[2:20:14]
to bring people together and thought, well, everyone has a
[2:20:17]
dumpling. So let's get all of the dumplings together. And
[2:20:20]
that's actually come out with my nieces favourite line of
[2:20:24]
storybooks as well featuring all, um, all the dumplings that
[2:20:29]
learn so much from each other. Um, so I'm looking
[2:20:31]
forward to this year's edition of that. So thank you
[2:20:34]
so much. See you guys in September. Thank you, Councillor.
[2:20:38]
Um, I wanted to take an opportunity because we have,
[2:20:42]
um, received some, some input and some questions about, um,
[2:20:45]
a recent purchase that was approved by Council. And there
[2:20:50]
was some discussion around, you know, the process under which
[2:20:54]
that, that took place. But, um, I'm very pleased to
[2:20:57]
be able to, uh, to talk tonight about, uh, the
[2:21:01]
city purchasing land in Moody Centre. Um, near Kyle Centre
[2:21:04]
for future use as park space. So recently we purchased
[2:21:09]
almost 33 square feet or four properties located near Kyle
[2:21:14]
Centre and Kyle Park for future use as public parks
[2:21:19]
base to serve the Moody Centre neighbourhood and the broader
[2:21:22]
community moving forward. So on behalf of Council, I'm pleased
[2:21:27]
to announce the purchase of this land, which helps us
[2:21:30]
meet the city's goals for Parkland established in the OCP
[2:21:33]
and the Park Land strategy. And the acquisition of new
[2:21:38]
Parkland to address gaps and meet current and future community
[2:21:41]
needs as identified as a high priority in both documents,
[2:21:46]
um, Moody Centre as noted as having the highest need,
[2:21:49]
um, and with the renewal and expansion of Kyle Park
[2:21:52]
highlighted, as we saw tonight as a top priority, due
[2:21:56]
to a recognised deficit of park land and anticipated high
[2:21:59]
demand for parkspace, um, as the neighbourhood evolves. This seemed
[2:22:02]
like the right move to make. So, um, the process
[2:22:05]
to develop both the OCP and the Parkland strategy included
[2:22:11]
exclusive community engagement with meaningful and inclusive opportunities to provide
[2:22:15]
input on community values and priorities. Feedback from the public
[2:22:20]
helped to shape these important documents, which reflects a shared
[2:22:24]
vision that guides counsel. And that is what we use
[2:22:28]
to make these types of decisions. In refining the parkland
[2:22:31]
strategy, we also heard valuable input from residents at the
[2:22:37]
Mayorstown Hall and Community Dialogue on Park Expansion in Moody
[2:22:40]
Centre. And that reinforced the importance of addressing Parkland needs
[2:22:43]
in this neighbourhood. So the purchase of these properties near
[2:22:47]
Kyle Centre was a strategic decision. Thoughtfully made to acquire
[2:22:51]
land adjacent to an existing park in a high growth
[2:22:55]
area and near additional properties purchased in recent years, uh,
[2:22:59]
for future park space. Land is scarce in Port Mooney,
[2:23:03]
which means that we have to act quickly and wherever
[2:23:07]
possible, uh, when the land becomes available, um, this helps
[2:23:11]
to ensure that we don't miss out on Parkland, especially
[2:23:14]
in areas where the need is the greatest. Uh, we
[2:23:17]
need, we now know that the community places a high
[2:23:20]
value on parks and open spaces, which are essential to
[2:23:24]
community wellbeing, biodiversity and climate resilience. So there will be
[2:23:28]
more information released to the public tomorrow, uh, through, through
[2:23:31]
a press release. It'll talk about, it'll give more details
[2:23:34]
about the purchase information, more details about Kyle Centre redevelopment,
[2:23:38]
um, and the Guiding Strategy documents that have led to
[2:23:41]
this strategic decision of Council. But I wanted to provide
[2:23:44]
that to members of the public tonight. Madam Ms City
[2:23:50]
Manager, Madam Mathewson. Ms. Mathewson, do you have anything for
[2:23:56]
us? I think you do not. All right. Um, then
[2:23:59]
that will, that will give us to, um, adjournment. The
[2:24:03]
meeting is adjourned. Thank you everybody.