Good morning and welcome to the Board of
County Commissioners meeting, uh,
[5:04]
land use meeting. Today is Thursday,
September 10th.
[5:07]
We do begin each of our meetings with an
invocation,
[5:10]
and this morning we have Pastor Jason
Brockman from Colorado Springs Baptist
[5:14]
Brockman from Colorado Springs Baptist
Church.
[5:15]
We invite you to stand and join us.
[5:17]
Thank you, Commissioner Geitner. Thank you
for the opportunity this morning.
[5:21]
Let's go ahead and bow our heads in
prayer.
[5:24]
Father, we thank you for the privilege it
is to be able to have meetings like this.
[5:29]
I know many times we Amen.
[5:31]
Lord, I pray that as we come and there are
people here that have maybe a little bit
[5:36]
of angst, a little bit of pressure,
stress, understanding,
[5:39]
something that wants to be done, but Lord,
[5:42]
I pray You'd help us to remember how
blessed we are to be able to have this
[5:46]
blessed we are to be able to have this
method.
[5:47]
Lord, thank You for the fact that each and
every person here has the ability to have
[5:52]
a personal relationship with You.
[5:54]
Lord, I pray that each and every person
here serving or being served would
[5:58]
here serving or being served would
determine
[5:59]
to make that decision to put their faith
and trust in you.
[6:03]
Lord, for those who are leading in this
capacity, thank you for the work,
[6:07]
the effort, and the service they provide
to our community.
[6:11]
Lord, I pray everything that is done today
would be done in the right spirit and the
[6:16]
right tone. I pray that each of us here
would realize that we're here to serve one
[6:21]
another and the great privilege it is to
be servants.
[6:24]
Lord, thank you for those who have really
gone out of their way.
[6:28]
I know many times we don't Think of people
in leadership many times,
[6:32]
of how they sacrifice for us.
[6:34]
Lord, I pray for each person who has a
need here today.
[6:37]
I'm confident someone in here is going
through a struggle and a difficulty.
[6:42]
Lord, I pray that you would meet their
needs.
[6:44]
For those who have ailments or sickness,
[6:47]
for those who are dealing with other
issues that are not described, Lord,
[6:51]
I pray that the decisions that we made
today and the conversations that happened
[6:56]
would honor you. In Jesus' name we pray.
Amen.
[6:59]
Commissioner Wysong,
[7:05]
if you'd lead us in
[7:11]
the Pledge of
[7:16]
Allegiance, please.
[7:22]
Item 3.
[7:24]
Item number 3 is staff emergency items,
[7:27]
and I'm unaware of any staff emergency
items today.
[7:31]
Item 4.
[7:33]
Item number 4 is changes, postponements,
and notice of the next meeting.
[7:38]
I'm unaware of any changes or
postponements to today's agenda,
[7:41]
and the next meeting will be September
15th at 9:00 AM.
[7:45]
Item 5.
[7:47]
Item number 5 is the land use consent
calendar, including items 5A and 5B.
[7:52]
And Madam Chair, there's one exhibit that
has been handed out that was received
[7:56]
after the packet was published to the web.
[7:59]
Okay, thank you. Uh,
[8:00]
is there anyone here who wishes to speak
on an item on the consent
[8:06]
calendar? Okay, seeing none,
[8:08]
I will bring it up here to commissioners
for any comments or motion.
[8:14]
Commissioner Wysong.
[8:16]
Thank you, Madam Chair. Uh, just a, a
couple of comments.
[8:21]
Um, Under the Kyle Reese Zone 5A, I was
reading through all the documentation.
[8:27]
It was just the traffic study alluded to
another potential development tie-in.
[8:34]
And I, I kind of asked the, the question
of, of our executive director of planning.
[8:41]
And since it's, it's been approved, but
there's nothing there yet.
[8:47]
It just seems that if traffic study
mentions it, there should be follow-up,
[8:53]
and that kind of defines what potentially
could be there.
[8:58]
Right in, right out only on a
55-mile-an-hour highway just makes me a
[9:04]
55-mile-an-hour highway just makes me a
little
[9:04]
nervous, is all. And that I just wanted to
kind of address that.
[9:10]
Um, is, is a kind of a concern that has it
truly been evaluated from a safety
[9:16]
perspective? I'm assuming it has from
CDOT. It just made me really nervous is
[9:23]
CDOT. It just made me really nervous is
all.
[9:23]
Yeah, I appreciate you bringing up that,
um,
[9:26]
given that this is in my district and this
is an intersection that I drive
[9:32]
regularly, um, always concerned about. I
drive it regularly, and so do my children.
[9:38]
And so, you know, these are things that I
think we all want to make sure things are
[9:44]
safe. But I will say, going through the
notes,
[9:47]
looking at some of the comments from the
Planning Commission,
[9:52]
and this was also discussed, I do agree
that this is the map amendment stage,
[9:57]
and we have further things down the road.
[10:00]
And while that is the current
recommendation or requirement that is
[10:05]
recommendation or requirement that is
being
[10:06]
recommended, um, that we will see in far
more detail as we move through this
[10:11]
more detail as we move through this
process
[10:12]
and have the opportunity to ensure that
safety moving forward as well.
[10:17]
So I too am comfortable with this, but
thank you for bringing up those concerns.
[10:23]
Okay, do we have any other comments or a
motion on the consent calendar?
[10:28]
Move to approve the consent calendar.
[10:32]
Second.
[10:33]
Okay, that has been moved and seconded,
[10:35]
and I will call the roll beginning with
Commissioner Wysong.
[10:39]
Aye.
[10:39]
Vice Chair Nelson?
[10:40]
Aye.
[10:40]
Commissioner Applegate?
[10:42]
Aye.
[10:42]
Commissioner Williams?
[10:44]
Aye.
[10:44]
And the chair votes aye. That passes 5-0.
Item 6.
[10:48]
Item number 6 is the called-up consent
calendar, and there are no items called
[10:53]
calendar, and there are no items called
up.
[10:54]
Item 7.
[10:55]
Item number 7 is department and committee
reports, non-action items,
[10:58]
and there are none.
[11:00]
Item 8.
[11:01]
Item 8 is the addendum, and there are no
addendums today.
[11:05]
Item 9.
[11:05]
Item 9 is the executive session, and there
is no request for executive session.
[11:09]
Okay, with that, this, uh,
[11:16]
we've come to the end of
[11:23]
this agenda, and this
[11:28]
meeting is adjourned.
[11:34]
Good morning and welcome to
[11:41]
the Board of Adjustment
[11:48]
meeting. Today is Thursday,
[11:55]
September 10th. We'll begin
[12:02]
with item 1.
[12:06]
Item number 1 is changes and
postponements,
[12:08]
and I'm unaware of any changes or
postponements.
[12:11]
Item 2.
[12:13]
Item number 2 is the consent calendar,
including item 2A.
[12:16]
Okay, is there anyone here who wishes to
speak on an item on the consent
[12:24]
calendar? Please come down, sir.
[12:27]
And just as a reminder, this is the
minutes— uh, we—
[12:32]
this is the approval of minutes on the
consent calendar. Okay. Okay.
[12:39]
Um, so I will ask if there are any
comments from commissioners.
[12:46]
I move approval of item 2A.
[12:49]
Second.
[12:50]
All right, that's been moved and seconded.
[12:52]
We'll begin the vote with Commissioner
Wysong.
[12:54]
Aye.
[12:55]
Vice Chair Nelson.
[12:57]
Aye.
[12:57]
Commissioner Applegate.
[12:59]
Aye.
[12:59]
Commissioner Williams.
[13:00]
Aye.
[13:01]
And the chair votes aye. That passes 5-0.
Item 3.
[13:04]
Item number 3 is a dimensional variance,
[13:07]
16990 Cherry Creek Crossing Drive side
setback relief,
[13:11]
a request by James Lucas for approval of a
dimensional variance to allow a 10-foot
[13:18]
side setback where 35 feet is required in
the Cherry Crossing PUD,
[13:23]
Planned Unit Development zoning district,
[13:26]
for the proposed placement of a detached
garage.
[13:29]
The 2.66-acre property is located at 16990
Cherry Creek Crossing Drive,
[13:35]
approximately 3,000 feet northwest of the
intersection of Hodgdon Road and Highway
[13:41]
83. Parcel number 6122008022, Commissioner
District 1. File BOA-26005.
[13:46]
Second.
[13:47]
Lacey Dean, Associate Planner, Planning
and Community Development.
[13:50]
Good morning.
[13:52]
Good morning, Commissioners. Um, this is
for BOA 265.
[13:56]
Um, this is requesting a setback relief
for a detached garage at 16990 Cherry
[14:02]
for a detached garage at 16990 Cherry
Creek
[14:02]
Crossing Drive. I'm the planner assigned
to this, um,
[14:07]
along with Joe Sandstrom from Department
of Public Works.
[14:11]
If you're watching remotely and have not
provided a name and reliable phone number,
[14:18]
please email that information now to
pcdhearings@elpasoco.com.
[14:23]
The procedure today will basically be my
presentation followed by the applicant's
[14:29]
presentation. If there are citizens in
favor, um, they will be called up,
[14:35]
followed by citizens against.
[14:38]
The applicant will have a chance to rebut
the citizens against,
[14:43]
followed by questions for staff, and then
you all will make a determination.
[14:49]
I'll give you a moment to read through the
criteria of approval for Board of
[14:55]
Adjustment. This is some additional
criteria, um, to consider.
[15:00]
So the request today is by James Lucas,
[15:03]
and he would ask for a 10-foot side
setback where 35 feet is required in the
[15:09]
setback where 35 feet is required in the
Cherry
[15:10]
Creek Crossing PUD. It is for a detached
garage.
[15:13]
The 2.66-acre property is located here,
[15:17]
which is approximately 3,000 feet
northwest of the intersection of Hodgen
[15:22]
northwest of the intersection of Hodgen
Road and
[15:23]
Highway 83. The zoning, as I stated
earlier, is a PUD.
[15:27]
This whole section here is the same PUD,
Cherry Creek Crossing,
[15:32]
but you can see surrounding it is other
RR-2.5 zoning.
[15:37]
This PUD also has a 2.5 minimum lot size
requirement.
[15:41]
A little bit of background for you.
[15:44]
The zoning was established on the property
in 1955,
[15:48]
and in 1997 it was rezoned to planned unit
development for Cherry Creek Crossing.
[15:54]
They platted it in 1999, and the existing
home was built in 2004.
[16:00]
The position of the home on the land,
[16:03]
as you'll see as I get through the PUD
guidelines in a moment,
[16:08]
it was built the way that it is based on
the natural features of the, of the site.
[16:14]
Currently, the most western corner of the
structure is only 10 feet from the setback
[16:21]
line. So when he's proposing a detached
garage on that side,
[16:26]
he's going to need more than the 10 feet
that is remaining before he encroaches
[16:32]
that is remaining before he encroaches
that
[16:32]
setback. This is the PUD here, the
entirety of the PUD.
[16:37]
This, um, blue square is indicating his
lot.
[16:40]
This is A piece pulled from that PUD
document showing the topography on his
[16:46]
document showing the topography on his
land.
[16:47]
You can see it slopes down as you go
further south,
[16:51]
and he actually has a no-build area all
along this southern portion.
[16:56]
It's hard to see on this image here, but
this part as well slopes down.
[17:02]
And I— this is a street view looking
toward the house from Cherry Creek
[17:08]
toward the house from Cherry Creek
Crossing,
[17:08]
and you can see it slopes down over here.
[17:12]
Over here is where he intends to put the
detached garage.
[17:16]
This yellow line, I'm sorry, indicates the
setback line,
[17:21]
and that red square indicates where he's
wanting to put the garage.
[17:26]
In terms of zoning compliance, um, with
the specific PUD, um,
[17:31]
a planned unit development zone is
basically a very specific set of design
[17:37]
basically a very specific set of design
standards
[17:38]
that are put in place for a certain area.
[17:41]
And in the Cherry Creek Crossing They
wanted to maintain sensitivity to the
[17:47]
characteristics of the site. They have
dimensional standards here for you.
[17:53]
Like I said, a minimum 2.5-acre zone or
lot size.
[17:57]
The 35 feet on the sides and the rear is
where he's going to be asking for relief
[18:03]
because he needs 10 feet on the west side
of his property.
[18:08]
These are some development guidelines I
pulled from the PUD as well that I think
[18:14]
pulled from the PUD as well that I think
are
[18:15]
relevant to his request.
[18:17]
The buildings shall be situated to
maximize the amount and quality of views
[18:23]
maximize the amount and quality of views
and
[18:23]
natural light. The plan utilizes the
floodplains, drainage structures, slopes,
[18:29]
and existing vegetation to their best
advantage and further enhances the
[18:35]
advantage and further enhances the
elements to
[18:36]
create a quality environment in which to
live.
[18:40]
They minimize damage to the existing
vegetation maintained in a natural state
[18:46]
vegetation maintained in a natural state
as
[18:46]
nearly as possible. So again, as I
mentioned prior, the house was put where
[18:52]
mentioned prior, the house was put where
it is,
[18:52]
so close to that other setback.
[18:55]
Right.
[18:55]
Because of the other natural features that
are on the site.
[18:59]
One of the requirements as well in the POD
is that both the Cherry Creek Crossing
[19:05]
Design Review Committee as well as our
department needs to approve the variance.
[19:11]
He has already received approval from his
property owners association for the
[19:17]
request. Another, um,
[19:19]
piece that limits his placement of it is
that accessory buildings should not be
[19:24]
located closer to the street frontage than
the main building.
[19:29]
Analysis of the approval of criteria.
[19:32]
It is not exceptionally narrow or shallow
or oddly shaped.
[19:36]
However, with the exceptional topographic
conditions—
[19:40]
I wouldn't say they're exceptional,
[19:42]
but the specific design was based on the
PUD requirements, um,
[19:47]
which again is limiting options for him of
where to put this accessory detached
[19:53]
garage. The variance would provide
permanent relief in speaking to this
[19:58]
permanent relief in speaking to this
additional
[19:59]
approval criteria to consider.
[20:01]
Um, it does not include an alternative
plan,
[20:04]
and it is intended to preserve the natural
features of the site,
[20:09]
which I think are again limiting where he
has options to put this structure.
[20:15]
2 alternatives that I came up with in
reviewing this is that he could put it
[20:20]
elsewhere, but as I've already discussed,
that would require a lot of grading,
[20:26]
which I think goes against the intention
of the PUD. He could also possibly rezone.
[20:32]
That does not seem feasible though,
[20:35]
given that it would not then be harmonious
with the rest of the surrounding
[20:40]
properties in the PUD.
[20:42]
The next couple slides I'm going to go
through, um, if you have questions on
[20:47]
through, um, if you have questions on
them,
[20:48]
I will call up Joe Sandstrom from
Department of Public Works.
[20:52]
There were no concerns with drainage and
erosion.
[20:56]
Um, it's not in a regulatory floodplain.
[20:59]
It is part of the West Cherry Creek
drainage basin.
[21:03]
Um, there was no drainage report or
grading erosion control plan required due
[21:08]
grading erosion control plan required due
to
[21:09]
minimal disturbance. Traffic study was not
required.
[21:12]
It's not going to generate any additional
trips,
[21:16]
and the road impact fees are not
applicable.
[21:19]
Our department notified 21 adjoining
neighbors on August 25th.
[21:24]
We have had zero comments in opposition
returned.
[21:27]
We'd had one comment in support posted to
the public eDARP file.
[21:32]
And this is just a poster of, uh,
[21:35]
or a picture of where he posted the
notification on his site.
[21:39]
This blue car right here is where the
garage will be if it is approved.
[21:44]
Okay.
[21:45]
The applicant himself also reached out,
um,
[21:48]
took it upon himself to reach out to his
neighbors and got, um,
[21:53]
several of them to sign a petition stating
that they're in approval of his request
[22:00]
to put the garage where he's proposing.
[22:03]
And then this is just an email from the,
um, Property Owners Association.
[22:09]
I also went ahead and looked around the
surrounding properties to see if anyone
[22:15]
surrounding properties to see if anyone
else
[22:15]
had been granted a BOA in this PUD, and I
only found one down here in this blue, um,
[22:22]
outline. They were granted a Board of
Adjustment 2004 for their lot width,
[22:28]
which is required to be 200 feet,
[22:31]
and they were granted 133 Commissioner
Wysong has a question.
[22:35]
Thank you, Madam Chair.
[22:39]
Could you go back a couple of slides?
[22:44]
Um, yes, I just wanted to read the, um,
[22:49]
letter from the HOA. Okay, thank you.
[22:59]
Um, if there are no questions, I can bring
up the applicant.
[23:01]
Questions before we move to the applicant?
Okay, I think we are ready.
[23:23]
Thank you. My name's Jim Lucas.
[23:25]
Um, first and foremost, thank you for, uh,
having me here today. I appreciate that.
[23:31]
I also want to give a shout out to Lacey.
[23:34]
She's been absolutely awesome as I started
this process.
[23:38]
The communication back and forth has just
been great. So thank you so much.
[23:43]
Um, my wife and I have looked at different
areas on our property to try to build a
[23:49]
detached garage.
[23:50]
Thank you.
[23:51]
to where we wouldn't have to face a
variance ruling.
[23:56]
And truly, it's like Lacey said, there's
no really good area.
[24:02]
Um, from the driveway down to the east,
the drain, it just drops off.
[24:09]
It's quite the incline. And so I'll share
that with you.
[24:14]
Lacey, you said scroll down. There we go.
There we go.
[24:20]
Okay, this is just a view from me standing
in the street.
[24:25]
You can see the asphalt, and as the
asphalt curls back to the right, um,
[24:32]
that is where that garage would sit.
[24:35]
The house on the far side that you can
see, the tan,
[24:40]
that's my next-door neighbors. They fully
endorse this project.
[24:47]
That's who it affects the most. Now
listen, I am not good at drawing.
[24:53]
That was done by my cursor on the
computer.
[24:57]
But in essence, that gives you a visual of
where that detached garage would sit,
[25:05]
and that's also behind the, uh, utility
lines of gas and water.
[25:11]
Also, the trim of the house is a Dover
white stucco.
[25:16]
Black bean is the trim, black shingled
roof.
[25:20]
The detached garage would match the
current home.
[25:25]
Again, my hand got a little squirrely, but
that is facing our house east,
[25:32]
so you can see the house and you can see
the drop-off actually.
[25:38]
To the right, and that would be the
footprint of the garage.
[25:44]
And there's the 4-sided elevation of it.
[25:53]
There.
[25:57]
I think that's it. Okay.
[26:01]
Do we have any questions for the
applicant? Commissioner Wysong.
[26:04]
Thank you, Madam Chair.
[26:07]
Um, just find a couple of interesting
things that the, the POA is,
[26:13]
is in support of, uh, the encroachment on
the, um, side easement,
[26:20]
but they weren't— they didn't appear to
give you an option of
[26:26]
encroaching on the 90-foot easement in
front of—
[26:31]
between the street and the house,
[26:34]
which I just kind of thought was
interesting.
[26:38]
And then another is,
[26:40]
I believe you said in some of the
documentation that you're adding the
[26:47]
garage because the POA requires all cars
to be in a garage.
[26:53]
So there's a piece to that. You need
to—I'll give you a little insight to me.
[26:59]
I'm a retired educator. They want cars
parked in there. That's a small part.
[27:05]
It'll actually—I restore motorcycles, so I
have four motorcycles in our garage,
[27:10]
and anytime I want to work on them,
[27:13]
I have to pull vehicles out to pull the
bikes out to work on them.
[27:18]
And so really, that detached garage is
going to be to put motorcycles over there.
[27:24]
And in time, I would like to get a lathe
and do some fabricating.
[27:29]
No, they're not loud or industrial. It's
very quiet.
[27:33]
And so that's a large piece of it.
[27:35]
And then also to get—
[27:37]
we have a brush hog that you can see in
the background on one of those pictures.
[27:42]
It's orange Kubota. And get that into the
detached garage.
[27:47]
So to answer the question, yes, they don't
want cars parked outside.
[27:52]
But our cars parked outside, yes, at
times.
[27:55]
And then when you purchased the home,
[28:00]
you knew what the requirements were for
the side
[28:06]
setback?
[28:07]
So we did it. We bought that home in April
of 2010,
[28:12]
and at that time I wasn't involved as much
with that stuff and was aware
[28:18]
of the side setbacks and all the, uh,
[28:21]
declarations for the Cherry Creek Crossing
neighborhood.
[28:25]
Okay, thank you.
[28:27]
Okay, any additional questions for the
applicant?
[28:36]
All right.
[28:36]
Oh, sorry, Commissioner Applegate.
[28:38]
So I was looking at the pictures and I'm
trying to get like a line drawn so I know
[28:42]
where it's at, about how far from this,
uh,
[28:45]
on that one side will it be to your fence?
[28:47]
Because it—
[28:47]
so that was in your kind of near that back
fence there.
[28:50]
To the, to the side fence of our yard?
Yeah, side fence.
[28:53]
It would probably be 2 to 3 feet from
that.
[28:55]
Okay, so pretty close.
[28:56]
Yes.
[28:56]
All right, thank you.
[28:57]
Yep.
[29:01]
Okay, all right, I think, uh, thank you
very much.
[29:05]
I think we're going to move to the public
input portion of the hearing at this
[29:11]
point. So if there's anyone here to speak
in support of this application,
[29:16]
I ask you to come forward at this time.
[29:19]
And seeing none, I'll ask if there's
anyone here to speak in opposition to this
[29:24]
application. Okay, seeing none, uh, this
is generally the rebuttal portion.
[29:30]
You don't have anything to rebut,
[29:32]
so I'll just ask if you have any
additional comments.
[29:38]
Okay.
[29:39]
I will tell you all the neighbors—
[29:40]
If you would come to the microphone just
so that we could get you captured on the
[29:44]
record.
[29:45]
I will tell you that, uh, all the
neighbors have been sensational.
[29:49]
They all support it.
[29:51]
I just saw a thing come through the EDARP
yesterday of Ron Kramer.
[29:55]
The mailer was sent back, uh, from the
post office.
[29:59]
Long story short, he lives directly across
the street from me,
[30:03]
and he was on one of those signed notes I
did early on, uh, to approve it.
[30:09]
So just want you to be aware of that.
[30:11]
Thank you. Thank you very much.
[30:14]
Okay, so with that, um,
[30:16]
we have gone through public input and the
rebuttal portion,
[30:21]
so I'm going to make sure there aren't any
last questions for staff.
[30:27]
Okay, then we will close this portion of
the hearing.
[30:31]
We'll move to any comments or a motion
from commissioners.
[30:36]
Um, I'm in support of this application,
and unless there's any comments,
[30:41]
I'll make the motion.
[30:43]
I move to approve item number 3, BOA
26-005,
[30:46]
the 16990 Cherry Creek Crossing Drive side
setback variance,
[30:50]
incorporating staff's recommended
conditions and notations,
[30:54]
and further finding that based on
equitable considerations presented by the
[30:59]
applicant, the burdens of strict
compliance with the zoning requirements
[31:04]
significantly exceed the benefits of such
compliance for this specific piece of
[31:09]
property. I further find that the subject
property has numerous legal restrictions
[31:14]
which would make placement of the garage
elsewhere a hardship.
[31:19]
This is due to the existence of the
no-build area, the steep slope in the
[31:24]
no-build area, the steep slope in the
back,
[31:24]
the general configuration of the home on
the parcel,
[31:27]
and the PUD guideline requiring that
garages not be prominent along
[31:32]
garages not be prominent along
streetscapes.
[31:33]
Second. Okay, that's been moved and
seconded.
[31:37]
Do I have any further comments this time?
[31:41]
Okay, I will, um, go ahead and call the
roll beginning with Commissioner Wysong.
[31:49]
Aye.
[31:50]
Vice Chair Nelson.
[31:51]
Aye.
[31:51]
Commissioner Applegate.
[31:53]
Aye.
[31:53]
Commissioner Williams.
[31:55]
Aye.
[31:55]
And the chair votes aye.
[31:58]
That passes 5-0. Congratulations.
[32:02]
Okay, item 4.
[32:04]
Item number 4 is the addendum, and there
are no addendums today.
[32:08]
Item 5.
[32:09]
Item 5 is the executive session, and there
is no request for executive session.
[32:13]
Okay, with that, we've come to the end of
this agenda,
[32:16]
and this meeting is adjourned.