Falcon Heights, MN meeting

Falcon Heights, MN · More Falcon Heights, MN meetings · More Minnesota meetings

Transcript

Download: Text · SRT ·
AI TRANSCRIPT

This transcript was generated automatically from audio using AI and hasn't been reviewed by a person — it can contain mistakes, including plausible-sounding sentences that were never actually said. Treat it as a starting point, not a verbatim record.

[0:23] Welcome to the Falcon Heights workshop on Wednesday, August 26, 2026, I'll call this order at 6 p.m., roll call, gust of sin here, may hear, no, may hear, mogan, hear, vice of bird, hear, when a ham, hear, and ricks it.
[0:45] And so we'll go to our right to it our policy but it works out number two pavement management program and
[0:57] turn it over to the American Center City and to the right.
[1:00] Or do I have an introduced by you?
[1:07] You can jump right here.
[1:08] to do with Eric.
[1:09] Well, thank you very much.
[1:10] Thank you.
[1:11] First workshop.
[1:14] So I appreciate the opportunity to come to all of these.
[1:17] We've done a few work sessions before and go.
[1:19] So I don't have a presentation today.
[1:21] Okay.
[1:21] It's kind of an opportunity more of just the discussion, if you will.
[1:26] Hopefully you did have some time to look at the B&B or the 2020-26 payment management plan.
[1:33] Staff, we did have an opportunity to kind of look at it with some fresh eyes.
[1:36] And looking at the past, I'd say, 10 or 15 years of the PMP, what was kind of in the past
[1:46] presented was very software-based, very try to explain what I think was a new technology, maybe
[1:54] 15 years ago, which was good points and how they would manage the data essentially like.
[2:00] So, what we did is looked at the PMP is what I feel I did for the essentially which is
[2:06] more of a planning document that outlines the framework for how we make our decisions.
[2:11] Obviously it does go over the data and how we collect it.
[2:15] Means and methods and things like that, but it's really kind of explaining now
[2:19] how we make decisions we do leading up to what's the most important thing in the PMP is what is your plan
[2:25] or a capital improvement plan.
[2:28] Today's conversation is really going to focus on the capital improvement plan to fight your
[2:31] outlook.
[2:33] We really are looking for feedback thoughts from council and kind of if you see a different
[2:37] direction you want to take anything as well as the plan itself there are some goals that
[2:41] were set by council I think years ago such as you know having an average OCI or a condition
[2:47] index how good are your roads setting that at 75 which is a very typical part of Senate
[2:53] which is a fairly good condition for your roads.
[2:57] So any comments that you have on the plan,
[2:59] we can talk through today,
[3:01] but I'm also open to emails or other conversations
[3:04] either through Jack or myself about things you'd like to see
[3:07] implemented in the plan.
[3:09] I don't think the plan will be presented
[3:11] until next month as far as a formal,
[3:13] you know, a submittal and acceptance by council
[3:17] that this is our 2020 six plan.
[3:19] The plan is meant to be updated,
[3:21] essentially any of these that I would keep track of the projects that we've done, the OCI's,
[3:27] how the, you know, cities looking and helping form our capital improvement plan five years at
[3:33] the time essentially to make sure we're on track on budget and managing our asset management
[3:39] or our pavement asset management as best we can. Because honestly, it's probably the biggest asset
[3:44] any city owns, and it is for the city of electronics as well.
[3:49] A couple of things to highlight, and it is in the RCA, but some of the things that I think
[3:55] are really important to highlight with the pavement management plan is what the decision-makers
[4:02] and what you guys have done that has has led to, which is a hit remarkably good average
[4:06] So C.I. from our last rating in 2025 we have a...
[4:12] In your college saying it was C.I. and here you call it P.C.I.
[4:16] A statement? Yeah, because our payment condition indexer had interchangeable.
[4:21] So we have a PCI so it's roughly at about what is it now?
[4:25] It's a 85.9.
[4:27] That does include alleys.
[4:29] I think there are a couple data points in there that we're going to be looking at as well.
[4:32] just when we were looking at peace guys and how it informed our five-year plan, where we know
[4:36] there's probably some errors that we're going to want to just flesh out, so that has
[4:40] to do with the alleyways.
[4:42] But I'll get a little more into that in detail, but generally speaking it's one of the highest
[4:47] average OCI's or peace guys probably in the metro area, which is, I think, something to
[4:52] celebrate.
[4:53] It's really great investment of taxpayer's funds, management of the asset itself, and
[5:00] and speaks to kind of where we want to go next,
[5:02] which is a look at, you know, prevent it maintenance
[5:04] and you're well, and that's, again,
[5:06] outline him the report, but something I want to highlight
[5:08] today as well.
[5:10] Essentially, you know, you have your roads
[5:12] and really good condition, a lot of them have been either
[5:14] milling overlaid, rehabilitated.
[5:17] So how do you keep them, and it's good at condition,
[5:20] but, yeah, at least amount of money,
[5:22] and people, you know, get the bank for your buck,
[5:23] and that's where preventative maintenance comes into play.
[5:26] So that's one thing that's discussed in the PMP,
[5:28] One thing staff is trying to do some assistant concert with a public post director, and myself, and just, you know, industry standard, is getting back into
[5:38] Crack ceiling or a Crack ceiling program, making sure that no water is getting into the roads, and literally is petty on the dollars to do that work, and extend the life of the road even further.
[5:49] So that's one thing that is proposed in the CIP.
[5:53] We'd like to start in 2027, actually, budgeting for it.
[5:56] We did in 25, conduct a craft seal operation to start looking
[6:02] at the program and getting comfortable with craft sealing we are.
[6:05] There are two other methods when it comes to preventative maintenance.
[6:08] That's F is currently exploring one as chip seal.
[6:11] Chip seal is just put a bunch of a mulch in our oil down on the road
[6:15] and you put a really thin layer of small rock on it.
[6:18] It rejuvenates the road, if you will, as far as that top layer goes.
[6:23] In 2016, Metro Y, there is a big issue with what's called
[6:27] the lamination of the chip seal that's been adhered to the pavement,
[6:31] peel off, creative potholes, just created a big mess.
[6:34] So a lot of cities kind of backed off.
[6:36] The local road research order, LRB, and through the DOT,
[6:41] has been doing a lot of studies.
[6:43] Other cities are trying to find different ways to implement it.
[6:45] But as of now, Falcon Heights, we don't want to be any kind of guinea pig if you will.
[6:51] We want to make sure that the science is sound.
[6:54] They figured out what's going on before we might start to reintroduce that.
[6:58] It's great for pavement management, but also there's a policy direction or a practice that
[7:03] we look to you guys to as well if we want to introduce that, because Craccyline is a messy
[7:08] operation where some cities might not do it because rocks get all over the place.
[7:14] You know, and then my other way is to look and prevent it major maintenance.
[7:19] The other one is called a spray-on-rejuvenator, that's relatively new.
[7:24] It is another type of emulsion that goes down, but there's no rock, there's no...
[7:30] It's just the motion essentially and it absorbs them in the asphalt and the idea, the best way to think about it is it's like a motion for your pavement.
[7:38] It helps rehydrate your flexible pavement so it doesn't get rigid cracks, breaks all that kind of stuff.
[7:47] It still feels the existing cracks. It doesn't feel the cracks.
[7:50] So the idea is you do it within one to three years of a road, a new surface, and that will extend,
[7:57] they say, extend up to seven years of the life cycle of the road, meeting that you wanted to
[8:02] craft seal as soon, and helps kind of cure up or sealing your cold joints and other kind of
[8:07] other things that, again, it's not going to be something you'd be in lieu of cracks healing.
[8:12] It's just light chip sealing, it's even cheaper pennies on the dollars, but we want to see a
[8:18] more data behind it, you know, how seeing test cases beside each other, you know, how
[8:25] the road actually acting with this stuff. Spray on, rejuvenators, go back to the days
[8:31] of like Lynsey oil and things like that when people were trying to put down on asphalt
[8:35] and do the same thing, rejuvenate the pavement life. So again, that's how we want, we don't
[8:41] want to jump on board. A lot of cities around the metro area are exploring these, there's
[8:45] products coming into the Minnesota area. I think Eden Prairie, and I want to look there and
[8:51] checked out a test study they're doing out there for the products. They're exploring two
[8:56] different ones. Lakeville Woodbury, there's just a lot of cities. Even the county
[9:01] started to look into products like Recklomite, which is the spray under June of the year.
[9:05] You might have noticed I'm Connie Rowby. And Hamland, it looked a little dirty. The pavement
[9:10] markings of less because they put on a superjuvenator essentially, takes about a year for the
[9:17] markings to come back. So again, just kind of highlight that key. Just to clarify the
[9:22] cracks, the only thing is that what we recognize is that it's sort of tar, it's the paper,
[9:26] the toilet paper, whatever. Yes, toilet paper or not, you know, we can work around that if that's
[9:30] an issue. But yeah, that's where we're putting in a flexible tar into the cracks you're
[9:36] out at first, depending on the size,
[9:39] poured in, squeegee it on, see,
[9:41] a little overbending, and that helps.
[9:42] I feel filtration in the road, so a really solid technique
[9:46] that we would love to introduce back
[9:48] into Falcon 8's on a regular basis.
[9:50] Where did we do it in 25?
[9:52] Was it the Grove?
[9:54] Yes, yeah, yeah.
[9:56] Full transparency.
[9:57] There was some application issues.
[9:59] As far as they did put down to where
[10:01] the paper was, in fact, they wouldn't.
[10:03] We're still working through some of those issues right now
[10:05] the contractor, as far as warranty items, but the practices itself, and to be honest,
[10:10] farter is an excellent contractor when it comes to crack.
[10:14] I think there's just a little bit of, you know, the left hand wasn't talking the right
[10:18] as far as, you know, what the true spec was for real looking for.
[10:22] But the practices itself is, you know, is invaluable, I would say, as far as
[10:29] extending my throat.
[10:31] of what point you put in a, once that you've done a mill and overlay and then you do a rejuvenator
[10:39] like within a year or so. So, when you go as like how many, how, sure. Yeah, what's the kind
[10:46] of that cycle or how, how do you anticipate doing it. You know, rule, you could, you could say,
[10:52] well, the common cycle would be anywhere between two, three, and seven years to do it in
[11:00] So, we just go out over here and wherever it is, yeah, wherever it is, cracks, we'll get
[11:05] get it done.
[11:06] And that is really helped the longevity of our roads.
[11:11] So, at least having a program spelled out in a plan, right now it's their high level estimates,
[11:19] but we're just saying through the investment every other year, budgeting 50,000 for
[11:24] or crack ceiling, it doesn't mean that we're gonna spend all of that for me.
[11:30] In fact, I would anticipate that probably might come in a little lower as well,
[11:33] but we definitely want to make sure that what we have scope these areas.
[11:38] Yeah, we do that.
[11:40] Sorry.
[11:41] It's a good reminder.
[11:43] I'm just going to give it.
[11:45] And I think right now Eric to comment too.
[11:46] I think you're proposing about, like right now we're looking at 207 doing
[11:50] you're going to be 21 P&P roads, right?
[11:53] So here's about six years out.
[11:56] Well, I am Colin and I have a public board
[11:57] director.
[11:58] We drove these roads earlier this summer,
[12:00] just to kind of scope and see what it was.
[12:02] Because again, you go off of, well, from a task,
[12:04] you'd say, well, three, seven years, something like that.
[12:06] Let's check it out.
[12:08] Doesn't mean it gets programmed until we actually go out
[12:10] and look at it.
[12:10] And the roads are doing fairly well.
[12:12] We didn't want to do it this year, but after the drive
[12:15] and understanding, this is something a program
[12:17] and want to build into the PMP and get council direction approval, it's fine to wait
[12:23] a year on those. Those roads are really opening up well. So, because even if it's programmed,
[12:28] it's something staff will go out and inspect to ensure the scope is adequate. Again,
[12:33] think of the PMP as our high-level look at planning on kind of what we're doing. The closer we get
[12:38] to a project, the more we'll get involved on onsite inspections. We'll start doing geo-technical
[12:44] evaluations, you know, assesses the right treatment. Things that I think are so. But again,
[12:51] you'll see and we'll walk through here is this map that I printed out again a little bigger than
[12:56] what some print out here, so we can all see it. But we'll see that there's, it's, you know, the last five
[13:03] years we've been doing a lot of mill and all the ways rehabilitation safety are. But we don't technically
[13:08] all in that many centerline miles.
[13:10] I think around 14 miles of local roads
[13:13] are a great way that we manage.
[13:17] So because we've invested so well in it,
[13:19] now we're looking more again at the preventive maintenance
[13:21] that we were doing.
[13:24] Can you quickly just tell us
[13:25] what's the difference you've milling all the way
[13:26] in the other two years talking about?
[13:27] Sure, so milling overlay is where you grind off.
[13:31] So if your payment section is let's say four inches,
[13:33] you take off a certain amount of layer of it
[13:36] and then you just pay it back over it.
[13:37] is kind of your mid-treatment, I'd say.
[13:41] You can't continually just be willing
[13:42] to overlaze depending on a lot of your factors,
[13:45] but in the life cycle of the road,
[13:46] I think of a million overlays.
[13:47] You're about at the halfway mark.
[13:49] You're seeing cracks.
[13:51] You're seeing things, superficial, structural things,
[13:53] that you need to take that top layer off
[13:55] because of rattling, weathering, or other things,
[13:57] and get a fresh new coat on, which
[13:59] that can be another 10 to 20 years, depending.
[14:02] There's a lot of factors that go into it.
[14:05] Full-depth reclamation is more impactful.
[14:09] I'd say to the road section in your essentially creating a new road section
[14:13] at the conditions.
[14:14] Where you have a larger machine with drone and teeth
[14:18] that cut through and grind all of the asphalt,
[14:22] but then also incorporate it into the aggregate.
[14:24] So you're going down maybe 12 inches
[14:25] and creating a new gravel section if you will.
[14:29] Contractor then removes any access so you can pave
[14:32] you know, you're whatever your road design between the sections going to be so it's a little more in-depth
[14:40] The
[14:41] So last year we weren't able to do we had to do more than mill and overlay in the North House, yes, and then in the
[14:51] And then I felt okay, yeah, because I remember we had this discussion too much to understand the difference
[14:57] Yeah, no, there was a little bit of mill and overlay where we've
[15:08] So there's a number of activities listed on this on the key to this map, like reconstruction and reclaimed. So where is mill and overlay? Is that reconstruction?
[15:19] Well, that's a good point, so in the PMP, you know, the five years kind of is known.
[15:26] And there will be, again, some minor tweaks, just to make this a little clear.
[15:30] But you will see, it's on foot, so let's open the board.
[15:34] Mill and over later, it's not.
[15:35] We don't have a need based on either OCI or conditions of roads or any kind of other judgment
[15:41] or, you know, analysis or inspections, we've done.
[15:44] Mill and over later is going to be warranted.
[15:46] The reconstruction and that's going to be kind of the main talking point at feedback we need from console is actually associated with the alleyways.
[15:55] Is that reconstruction seems reclaimed?
[15:58] No.
[15:59] So Villanova really was the reclaimed, that's the 10-inch.
[16:02] So Villanova is just shaving off of the version.
[16:05] Reclaimed is the full depth reclamation.
[16:08] And these are good comments.
[16:09] I think what I can do too when it comes to reclaimed is maybe keep that consistent in the report.
[16:18] And the reclaimed is, I guess that's a reconstruction for their debt.
[16:26] And I do see now that the reclaimed is kind of in the table for 2027 showing as a reclaimed,
[16:32] for the alleyways even though the map says reconstruction.
[16:35] So we can make that clear.
[16:37] But I still don't understand what reconstruction means.
[16:41] Reconstruction is kind of removing everything and building down.
[16:44] Now, the reason why Reconstruction was sculpted for the alleyways is I don't have a solid project history of the work discipline telling these alleyways.
[16:59] These have been, while they are in public right of way, you know, per class and things like that.
[17:04] The maintenance responsibility has fallen on the homeowners, and that's for all of our policies and our assessment policies essentially.
[17:12] So, in order to, again, consider that it does be able to, to budget accordingly, I wanted
[17:20] to make sure that reconstruction was kind of the theme going into it.
[17:25] If we are to move forward in 2027, that, that, that, no, in Clayton, my change, it might
[17:30] not be reconciled.
[17:31] It might be milling over, like we did in 2023, by petition from 2021, on the, I, I think, I
[17:38] I don't know how I forgot what they called it, but there was an alleyway section between
[17:42] Pascal and Albert, again, between Iowa and I, I'd all had that alley that was done.
[17:49] And that ended up just being a mill and overlay, with a little score more, of course.
[17:54] Again, petitioned by the residents.
[17:57] So in order to, at least, plan, you know, a high level cost, that's why I was called
[18:02] Recon.
[18:03] I think though what I'm seeing in what I'm hearing too is let's make sure that everything
[18:08] kind of management. So is recon different than recon? Yes. So reconstructions. So let's say we're talking about a real way. Typically your aggregate base has gone bad, maybe plays a pumpkin to it. You can't really reuse anything on that product.
[18:23] Reconstimically involved also you're going to be doing a lot of utility work or you have to remove all the curb and cut it. We're not going to try to do some out repairs or anything like that. We've got to tear everything out and start new.
[18:34] And that's what's considered the end of the life cycle of a road as we need to do a reconstruction.
[18:40] And that was like Garden Avenue, for example.
[18:42] We did a full reconstruction because we changed.
[18:44] We removed everything.
[18:46] We changed the size.
[18:47] We changed the configurations.
[18:49] So the full thing was taken out.
[18:52] But I don't like, for example, you have 20,
[18:57] ah, for 20, 20 reconstruction in my alley.
[19:02] I know that we have records of what was done there.
[19:06] You seem to be suggesting we don't have records.
[19:08] I haven't been able to find them, so if we do have records, I can, you know, as we get closer to understanding it.
[19:15] If we're going to move forward, any records and any information about what was done is we know it was done.
[19:22] And so engineering knows that as well.
[19:24] I think Eric's referencing like everything from CAD files to like ads built,
[19:29] stuff like that right as well when you're referencing. So like we know that they did a
[19:34] road project in 2007, I want to say the last time the alleyways were done.
[19:40] Yeah, that's what we're about right. So that's what the data that we have. I think that's what
[19:43] airtrap and say is that we're supposed to go. Yeah. Yeah. So around 2007, I think that's when our assessment
[19:51] policy was redone. It was kind of with the alleyways partially in mind. Okay. That sounds
[19:56] We came in 2008 and we've not seen work in the alley since then, so we had to make $4,000.
[20:02] Yeah, and one thing we have to consider is drainage.
[20:05] So I guess what we can do is, just for the sake of time, I'm probably rambling too long,
[20:10] longer than I intended at least, is start to look at kind of the alleyway
[20:17] discussion, drainage, you know, so the impetus of why we're looking at it in
[20:23] twenty-seven is because of the new policy ship with our snow, maintenance, or snow-plot policy.
[20:30] Essentially, the city now is going to be taking on alley-piling before again maintenance.
[20:34] Even snow maintenance was done by the residents adjacent to the alley's 40 alleys.
[20:40] So, in taking on this asset and what is typical whenever you take on, it might have been private
[20:45] when you think of a private improvement and a government jurisdiction taking on a private improvement
[20:51] is doing sure it meets the standards in which we will need to maintain it, the longevity of it, the investment of it, all that kind of stuff.
[20:59] We want to show proper drainage for free-stoss cycles that, you know, is easiest and easier for our maintenance staff to maintain it.
[21:08] And again, also just making sure that what we're going to be maintaining is impression good condition.
[21:14] So in this sense, for the other ways, reconstruction doesn't necessarily mean that the surface or the depth is in any worst shape
[21:20] and another road that might be in North Mill and overlaid,
[21:23] but that needs things additional to just the pavement
[21:26] surface in the base.
[21:28] Correct, you're talking about maybe re-leveling
[21:30] and things like that.
[21:31] So yeah, there aren't so, for instance,
[21:33] with the Iowa project, I'll call it the Iowa Avenue
[21:35] or Alleyway project.
[21:37] There was some minor adjustments to the grade
[21:39] in order to facilitate drainage,
[21:41] but there also was a storm sewer system put in.
[21:45] That was paid from the storm sewer fund,
[21:47] but again, 90% of the cost for the policy
[21:48] for the actual alleyway was born by the residents.
[21:53] And that's really the topic, I think,
[21:57] I want to highlight with you to get feedback
[22:00] and direction because in 2025, we did do a project
[22:05] of an orthompty road.
[22:06] Those property owners were assessed.
[22:09] So whoever did not pay off the assessment right now
[22:12] still has an assessment on their property.
[22:16] And if the city moves forward with an alleyway
[22:18] project for all of our policies, for the assessment policies, no policy, I'll stop by the
[22:23] year of the year.
[22:24] Oh, I mean, I'm just done.
[22:28] I cannot, but be thinking of that week.
[22:30] We are now offering this service to stay in the class in the harassment of organizing snowplowing, but
[22:36] guess what now we're going to charge you to improve your alley. I mean, they might want to say,
[22:41] we'll just leave my alley the way it is, and I'll pay the $40 a month or winter. I don't know.
[22:46] This is exactly why we're working on our job. I didn't quite get the connection between the alley
[22:53] And I mean, my approach or thought would be that at least on the PMP map, there are some areas that show red and yellow, which is low quality of the, and let's focus on that, and that happened to include some of the alleys.
[23:14] So the alley plowing by the city isn't going to do any more damage than now, like,
[23:19] like, pregnant and do less damage than now, like, plowing by the private buck in here
[23:24] is out there.
[23:25] Sure.
[23:26] So, I think we can unhook those two things, like, we should focus on the quality of the,
[23:33] just to be very important.
[23:35] The connection was because they want to make sure the thing that's easier for us to maintain,
[23:40] including ice management and things of that nature.
[23:42] I think, just, that's the, that's the, that's the, that's the, that's the, that's
[23:44] That was the original thought discussion, and I do correlated to, you know, I don't want to call them private alleys, but I do look at them as it's nothing that the city had maintained.
[23:58] Usually, let's say you have a private water main that goes into an area in the H.O.A. or whoever doesn't want to maintain the water main, they want to give it back to the city.
[24:07] Well, usually the idea is we want to ensure that when we take it on, that is up to the standards and conditions of something new.
[24:16] Fairly common practice, but it's not obviously required by any means.
[24:21] But to your point, yes, that was the idea that let's get it into a condition that makes it the most maintainable as again, essentially.
[24:33] And it resets the life cycle, but what I'm also hearing is one idea, and these are the thoughts we're trying to get through,
[24:44] we'll just treat like a road.
[24:45] I mean, if the conditions bad and it needs to get done, let's do it.
[24:50] I can't say that.
[24:51] So as of right now, this was just done with OCI's and understanding, you know,
[24:55] kind of the taking on it, the snow club policy.
[24:58] Staff can walk these alleys.
[25:00] do our assessment, look at the OCI, look at the history, you know, it sounds like we have
[25:06] some more data. We can look at, and develop a more sequential plan, but then you're just
[25:11] kind of doing, I guess you're doing like a street network. One way we do plan street network,
[25:17] so it's also by area, right, you know, lumping them all in or trying to manage it and how they
[25:22] let's say you do one alley this year, and then two years later another alley, now your pavement
[25:29] cycle, that's going to, it doesn't lock you in, but that's essentially how you're probably
[25:32] going to maintain management of it.
[25:35] So, is there some cost, one of my thoughts of reading through all this, is there a cost savings
[25:40] of, say, doing the whole three blocks of the valley?
[25:45] There always is an economy in scale when it comes to the work you're doing.
[25:49] One of the, you know, just the simplest, you know, laying in fruit is just your mobilization
[25:53] for contractors.
[25:54] Right.
[25:55] equipment out. That cost will be there. And if it's one small project, that could be that
[26:01] mob cost. But if you have more to do, you can reduce that mob cost as far as spreading.
[26:06] I guess the alleyways are probably in similar conditions. I get similar amount of traffic
[26:10] at similar number houses on them. So probably makes it's going to do one to do them all except for
[26:15] the one that was recently done two years ago between Albert and Pascal.
[26:19] That said,
[26:22] I would like to take a close look whether they're actually really our drainage
[26:26] problems that require a reconstruction.
[26:29] I don't feel it my alleyway has day drainage problems.
[26:33] It's okay.
[26:33] I mean, we have something that problems and snow ends up at the end of the alleyways, but that's
[26:39] something that we hopefully have figured the past, that's the biggest issue with letting
[26:42] any liquid get out of the alleyways.
[26:45] But I will slip on a bit of a slope.
[26:47] So I think before we say the assumption of you or you constructed, we have good evidence that
[26:52] there actually really is a real drainage problem.
[26:54] Oh, of course.
[26:55] And if I may just jump in and just give some kind of policy clarification.
[26:59] So part of this, public works have been fighting the conditions of the alleys for years, right?
[27:04] And they're concerned, they've been fixing pot holes, they've been replacing pot holes,
[27:08] they're in a point where they can't do that anymore.
[27:11] Director, Caliended, shared that's been a concern of them taking over alleyway plowing
[27:15] is the condition of the alleys, right?
[27:17] Is that not just public improvements to the private improvements
[27:21] to the alleys of different things that are in there,
[27:23] but the actual conditions of them as well.
[27:25] We know that they're not up to our standards.
[27:28] There are concerns.
[27:29] But back to kind of the goal of tonight,
[27:32] we know too that engineering needs to spend more time on it.
[27:35] And so one of the things that kind of our strategy,
[27:37] sometimes we come and bring this in two months,
[27:41] engineering could do a lot of work on these alleys
[27:43] to a lot of determination.
[27:44] And that's going to cost us money for engineering costs, right?
[27:47] So if we send out the cruise, do the analysis, that's a cost to us.
[27:52] And so before we launch into that, we're looking for kind of a policy direction,
[27:56] high level, like what Jaleigh, but more this concept that we do know
[28:01] that our alleys need work.
[28:03] The cost of that through our assessment policy is 90% borne on by the residents.
[28:08] We know we had a 2025 assessment and most of these households were hit by.
[28:12] And so that's kind of, I think, what we're seeking too is this idea of the alleys do need work.
[28:18] They need attention. The levels might differ. I think a lot of them probably might end up just from our conversations.
[28:24] Other stuff they might end up with a million overlay at the end.
[28:29] But before we know that that requires us to invest in that work for engineering spend time.
[28:34] And if it's a no-go, if we don't want to talk about that for 2027, it doesn't make sense to launch into that for our planning purposes, right?
[28:43] So as we're kind of going to front end and saying, it could be up to this cost and is that something that we want to kind of further explore and plan for, and then maybe we pull back and scale back if we do more engineering.
[28:56] Of course you're talking about two different costs you're talking about.
[28:58] Do we normally incorporate that type of cost, the OCI, PCI analysis into the
[29:05] SESA cost, we don't pull that into it.
[29:09] So that's not always the same cost, whether you like it, maybe a 5-Jet or not, right?
[29:15] We, it's a cost that we incur and we don't count it towards the assessed cost.
[29:21] The condition.
[29:22] The condition.
[29:22] The evaluation.
[29:24] The evaluation.
[29:24] The evaluation, no, I think the clarification is if we send our survey grow to start, and we start, we have a project number,
[29:33] and we start building Falconites for our time.
[29:37] What is the engineering?
[29:39] Is that put into the assessment wrong?
[29:41] I don't believe we currently do that.
[29:43] It's not.
[29:44] No, so that's not assessed, right?
[29:46] That's a cost that we bear, right?
[29:48] So we pay that through our engineering or a project budget that we set up.
[29:51] We end up when we assess, we take the total cost.
[29:55] There is some engineering that goes into that,
[29:57] the engineers time, other stuff, that goes into the total cost.
[30:00] And then we assess by linear feet, right? So it's a fixed rate.
[30:03] And again, understand when the democratic change is if it's if we're doing a full reconstruction, the total their cost might be more per-linear foot, right?
[30:11] And that was a good example. Garden assessment per-linear foot was three times more of what the North South streets nearby, because it was a much more complex job.
[30:20] My point with you, you were asking, we need to make a decision, and we need to study in order to make a decision.
[30:26] So we, but the kind of jumped to this idea of needing to assess the decision.
[30:30] I'm just simply saying, we need to know the condition of our alleyways.
[30:35] Why don't we just, as a city, incur the cost that we have to do it.
[30:39] Either even if we don't do the alley project for eight years or five years or whatever it happens.
[30:45] I'm just, I'm just saying those aren't really tied together.
[30:48] It's an expense that we need to do regardless of whether or not we decide to do the road project.
[30:54] We need that that's they're not tied together as the same person as one we don't have to decide to go forward with the project to decide whether or not we need to know
[31:03] Go forward the project and that's now what I'm suggesting right there. It's more of a using staff time effectively planning for the right thing
[31:11] Like are we on is this something that we want to explore further as we start to think about do we want to consider doing the alleys for
[31:20] That guides Eric their time not just from a cost perspective, but also from a workload in planning too as we started to plan the budget.
[31:27] It's helpful for us that instead of kind of coming to you with a final plan in October that we have a little bit of preemptive work here in August, right?
[31:36] And just having that discussion early on talking about it not planning and picking specifically which roads not going down that path. That's a later path.
[31:44] It's more of a high level policy direction.
[31:46] So, I mean, to build on that, my thought on this is that I understand the idea of turnover
[31:54] of a private to a public road or from a city to a calendar or whatever that you build
[32:00] it up or whatever.
[32:00] I don't see the same thing.
[32:01] This is our road regardless of whether or not we were doing this no plan before or not.
[32:05] And so, it's always been our road.
[32:07] I don't necessarily see it the same way.
[32:11] I thought there was some interest in making sure that ice didn't build up and to make it easier for our staff to maintain it now that they're responsible for maintaining the snow.
[32:22] And that, to me, is an interesting reason to do it, but at the same time, it doesn't sound like there is an issue of ice.
[32:29] maybe we need to go a couple of seasons to see if there is any problem with maintaining the snow
[32:37] in the condition that it is currently. And then the last thing that I wanted to, in my opinion
[32:43] of how this works is that I want to, I know we do things as a project, but part of designing a project is
[32:51] also designing its impact on the financials of the community. And if we did just do a big project
[32:59] in the area, then maybe we do what we can to push this out to the future so that we're not
[33:07] doubling up.
[33:08] So, as you're looking for some input, those are my three inputs.
[33:11] I don't see this as an insane, same thing as turnover.
[33:15] I would do it if it was helpful for the city to maintain, I would imply to do it if it
[33:20] was helpful for the public works to maintain it easier, but at the same time I'm not sure
[33:24] We know that, and I don't like the idea of doing a project and doubling up one.
[33:31] Especially in the north home, I let him get through their assessment of their road, because
[33:35] for some of you are doing a five year, paying enough in five years, and then we'd be adding
[33:39] this on top of it.
[33:40] Let's have a vote.
[33:41] Let's have a vote.
[33:42] Yeah, but I just won one fact to highlight is that, you know, through the input from
[33:49] our public courts team, and the director is that, we do know that there are some
[33:53] alleys that are getting more difficult to just put the bandate on, do the
[33:58] potting on, and continually doing the potting on, and it's becoming an
[34:02] opportunity where if we looked at it through, you know, the lens of this, if this
[34:06] was a road, we would plan it on, hopefully, or we would plan it FDR or whatever
[34:09] that improvement must be. So I think it's also getting to, to what your point was,
[34:15] which is engaging kind of if we did an assessment to say, well this one alley 100% we need
[34:21] to get it done, but it's not, but it's before the assessment, so it was done, it went
[34:27] on the rolls on 26, so therefore it won't come out for rolls until 33.
[34:34] That would be quite
[34:35] a substantial push and it could get very difficult to maintain just through a pot of whole
[34:44] But I'm just trying to highlight that concern from the public ones.
[34:48] I'm just a struggling with the idea that we didn't bother to maintain the
[34:52] alleys because the residents took care of it.
[34:54] Even though there were city property.
[34:56] I just couldn't have had a hard time with that.
[34:58] Well, we never, I mean, we never, like, as a block,
[35:02] we had to plan for the plowing, but we never planned for the,
[35:07] whether or not we were reconstructing our alleys.
[35:10] And I was there in 2007, it cost us a lot of money on my block.
[35:14] But I have a suggestion that might help.
[35:17] I mean, I like Jim Logan's points.
[35:22] And would it be possible to kind of come up with three scenarios
[35:24] that public works in engineering?
[35:28] Say if we put a priority on fixing the roads or alleys,
[35:36] if they're red or yellow, we need to fix them sooner.
[35:40] And, you know, so that's one scenario.
[35:43] Another scenario is avoiding piling on assessments in areas where they've already had the, you know, pretty big assessments.
[35:52] I don't know, maybe other people can.
[35:54] I'm just thinking if we, if we get a clear idea of what our priorities are, like, not piling on these assessments, fixing the roads and have to be fixed,
[36:04] would or say we have to do the alleys because we're going to plow them if that's our priority.
[36:13] Say we had those three scenarios.
[36:16] Could without a huge amount of investment in engineering and assessment could you guys come up with
[36:24] sort of like I'm about the cost of those and what the positive and negative aspects of those would be.
[36:30] And other people might have other ideas about what those priorities would be for each plan.
[36:39] But I'm just thinking, you know, all these points we're making are valid and important,
[36:45] but for me, at least, it's really hard to put it together and say, well,
[36:49] that'll cost X amount of money or have this downstream consequence.
[36:53] Whereas if we sort of had a plan A has this cost and this downstream consequences.
[36:59] consequences, Plan B has this, you know, said it's, well I can speak a little bit to at least potential costs, again 10,000 feet, but in 2023 the final assessment role for that one stretch of value and it was logged in with a larger PMP project, which is on another, you know,
[37:22] The guiding framework of the PMP is, you know, let's utilize other projects and get things done.
[37:28] But in 2023 it was...
[37:30] A range of $1,000 to $1,300 per property. The 2025 PMP, where we did a full-death
[37:37] reclamation. Again, these are different allocations of assessment, not 90% of our
[37:42] values, 40% for roads. The 2025 PMP had a rate. It was an average of $1,200, but it
[37:49] range from $1100 up to $2,000 depending on the front foot. This design, that's the
[37:59] So that would have been spread out over seven years for a summoning man.
[38:05] To many assessments to the property, not the total cost of the project.
[38:08] Right, yes, but yeah, per property.
[38:10] So again, these numbers aren't refined, but you know, kind of using that methodology for doing all the alleyways.
[38:19] There's a potential range and as wide just because I need to sharpen the pencil as far as actual scope would be $1260 per property.
[38:29] So, you know, if you already have an assessment of 1200 on your property, if we did the
[38:34] alleys, just give context for, you know, a look at it through a financial list, it'd be another
[38:39] $1200.
[38:40] So, and then it encompasses the range from mill and overlay to reconstruction.
[38:46] Yes, yeah, roughly.
[38:48] So, my two cents on the alleyways, I think that we probably haven't done anything with
[38:53] them for us because they didn't really need it.
[38:56] I mean, the alleys weren't reasonably good sheet.
[38:57] The last couple of years they have gotten worse, a lot of them have a large crack down
[39:02] in the middle, and they're starting to shed off that pop-layer of asphalt.
[39:07] They're probably due.
[39:09] My other concern is that I don't want to wait too long with them, because if we get to the
[39:15] point where there are sections that are cracking up, like more than just the top, you know,
[39:20] quarter of an inch of an asphalt come up, which is a chunks coming out, you're probably
[39:23] not talking about a more expensive project, because that's the way roads work.
[39:26] I kind of learned that.
[39:28] Well, over the years, I'm going to go with more expense.
[39:30] It's going to be a fix.
[39:34] So it goes back to doing assessments.
[39:36] Well, the assessment thing.
[39:38] But yeah, the assessment of evaluations went different.
[39:41] The assessment gets used two ways here.
[39:43] But I also, I just want to...
[39:45] I mean, you're looking for some thoughts on how we think about this, I think.
[39:49] And my thinking on this is always our
[39:52] a little bit more flexible in that
[39:54] That we have the ability to sort of patch them up when we don't have the ability to do them, right?
[40:01] A road we can't really let go, really, really bad.
[40:05] Ali, I'm not saying we want to let somebody's Ali go bad, but I'm simply saying if it's a choice of
[40:12] public works having a little bit hard time doing their job, but it allows the people on that street to sort of
[40:20] Breathe a little bit more. I think we might have to take that risk a little bit in order to give the
[40:27] neighbors their opportunity to do what all other stuff we have to do patch and maybe do some
[40:33] plowing or whatever. That's just my thinking. So I think my thing was this was talking about it because we're taking it over
[40:39] and it's going to make it more difficult. It's called the work to do their job, which I totally understand respect.
[40:44] But at the same time, if we need to sort of do patching and stuff in order to give people a little bit more of a breathing room.
[40:50] I'm willing to, I mean, they probably would last a couple more years, but I'd get pretty
[40:57] antsy about pushing out the army.
[40:59] I mean, I don't know that if that's the best we would do.
[41:01] So I like scenario planning, I mean, one scenario that you can come up with some cost estimates
[41:07] on there that we let the alleys go, because this year, so this is the low alley approach,
[41:16] because it gives homeowners some freeing room and also we see get a report back from public
[41:25] works on exactly where the problems are because they're going to have one season of because
[41:30] they just still need a bunch of it. That's what this year is right.
[41:34] Yeah, get in plan. You just building into the plan, but go ahead.
[41:38] Well, it's just a low alley plan.
[41:42] and then the high alleys plan to do them because we want to do them and we have the benefits
[41:48] of getting them done, but we'd have the costs to the homeowners, which I'm also synthetic
[41:53] for, because I want to get a live on one of these streets, but the other thing we seem to
[42:02] be forgetting is there are other areas in the city that apparently need attention, right?
[42:07] It looked like Hollywood court was in pre-bed shape.
[42:11] Well, that's Alley.
[42:12] Yeah, that's Alley.
[42:13] Yeah, everything in 27 that's shown is recon.
[42:15] And what isn't?
[42:17] So I have bubbled in red.
[42:20] Three Alley's, if you will, that will be updated on the next map,
[42:24] but in the next BMP.
[42:26] So the Crawford we do have Alley.
[42:29] Section there, then he's be considered.
[42:31] But then again, obviously, that one, just between Alley and Alley,
[42:35] that was misrepresented in our good point data. One thing to think of as well is, you know,
[42:40] the Crawford alley and the Hollywood Court, I mean they don't have pending assessments and it's
[42:45] another opportunity to, you know, get the repairs done that are necessary based on the OCI's
[42:51] on the Nakumi Millet overlay or the other thing I want to stress to is any stormwater or drainage
[42:58] issues as far as just adding more stormwater. That doesn't get assessed to the property under
[43:03] that is from the storm capital fund as well.
[43:05] And when you see the ad store model, you mean adding pipe and piping and then, I'm going to see it.
[43:09] So your red squiggle, if this was added to the key means what?
[43:13] Yeah, that would be of the 2027 alley reconstruction areas.
[43:16] Those are all the alleys identified.
[43:18] We looked at it with a...
[43:19] So the red squiggly should really be gold-based.
[43:21] Yes, that would be updated.
[43:23] Okay.
[43:23] A few triggers.
[43:24] Apologize for that.
[43:25] And there's the one alley where it's missing any line between Albert and Pascal,
[43:30] which has not been recorded.
[43:31] They don't get it.
[43:31] We had that as a 100.
[43:33] So, at both alleys, it had a whole section there, each as a hundredths.
[43:38] And I think their data was wrong.
[43:39] So that this kind of...
[43:40] They're just duplicating.
[43:41] There's no way it's a 100.
[43:43] Yeah, yeah.
[43:44] Because it should be about the new one.
[43:46] It was a 100, right?
[43:46] The new one was the past Galsh.
[43:48] It should be a 100.
[43:49] And I... I don't...
[43:51] I think I have at least some thoughts here that from what I'm hearing from consos,
[43:57] let's not just look at it on off,
[43:59] do it or not do it. Let's look at a couple maybe different scenarios where we have
[44:05] a do nothing approach, which is always on the on the table. Maybe there's a medium approach,
[44:10] we find it to find critical issues. If there are, identify them and come up with a little more
[44:16] refined scope for 27 and then always the potential for what you've seen already today.
[44:24] So, thank you.
[44:25] That's your capture.
[44:27] Well, maybe you can answer this question a bit.
[44:29] Is there touch on us?
[44:31] Is there a concern with the periphery of the alleyways where people, maybe maybe getting a little bit free with where they put in gardens and retaining walls and their garage pads were built out and that kind of thing?
[44:46] Is that also a concern that might be driving a request for construction reconstruction of something alleyways?
[44:51] I don't think so.
[44:52] Okay, I would say it's more of just a condition analysis and to even back it up to the city first really started flagging the alleyway condition
[45:01] That was when it was initially brought up. The one of Eric's predecessors at that time, the direction from council was to do a petition, basically the same concerns is that this is expensive, the last time around, and so let's leave it up to the residents to decide if they want to do it.
[45:19] And so, then this is where this was during COVID, and so not everyone, you know,
[45:23] here anecdotally, and not everyone saw the petition, but they went and petitioned each
[45:28] alley and the goal from the council was if, over 51% signed on of neighbors that wanted
[45:34] it, they would do it.
[45:35] And that's where they only got the one alley to get over 51%.
[45:39] Other one, some of the alleys were at 40% or 35, but none were over 50, and that was why they did
[45:46] it.
[45:46] But so this has been flagged, is that the conditions are, you know, intermittent a lot of
[45:52] his costs.
[45:53] And so there wasn't a statutory assessment petition.
[45:57] It was just a, are both correct.
[45:59] It was like, yeah, there's no, we didn't kind of do have a practice for it.
[46:02] It was more of a just a policy direction for the council at that time.
[46:06] Because if I remember in 21 week, we had heard that alleyways were, you know, should
[46:15] be repairing shape that they were, that some of the allies were such that public works
[46:22] couldn't keep up with the demands, and then there were some water issues on a Rona and
[46:29] Pasco, at that alleyway that needed to be addressed,
[46:36] and the thought was that we would
[46:40] Give everybody an opportunity to catch some economies of scale and put the word out that if if you want it to do this it would cost you about
[46:52] $700 a hit back then
[46:57] and
[46:58] if you were willing to do that you
[47:00] you don't sign up.
[47:03] That was the thought since it was such a large
[47:06] You know, the assessment policy being at 90%, it puts a lot of burden on homeowners and hence why we wanted to have the people would be assessed to be in favor of it before we just went and did it even though the engineering studies were showing that it needed to be needed to be done.
[47:32] So now when we go back six years later to or seven, you know, to study them again, we can see what seven years of waiting to do this is meant.
[47:47] Probably should do an analysis of the alleys so that then we can tell that if we decided to put it off for another four years.
[47:59] What, you know, that we're purposefully doing that as a policy to say, you know, your
[48:10] alleys may be in disarray for in a couple of four years, but you won't have to pay
[48:17] to fix them until they're.
[48:19] Well, we can, and I'll work with Jack, Colin, and the team to look at, you know, the best way to present that, whether I, I don't want to call it a feasibility memo, we don't want to take that far, but at least some kind of analysis or important that we can provide that kind of, at least gives maybe a wider spectrum of options for you to to consider and, you know, guide us through this me and me.
[48:44] I don't, I'll work with you to see what's good timing and how the stars need to align
[48:50] as far as, and technically we don't have to accept the P&P, the formal report, next month
[48:57] or anything, so we'll work on timing and get you guys something that maybe there's a little
[49:01] more refined as far as some maps and I level estimates you want to do what you're doing, I want
[49:05] to do a kind of thing.
[49:06] Yes, options.
[49:08] For what would push it?
[49:09] benefits associated push those costs in to twenty nine or thirty-one and all versus twenty
[49:17] seven and that's the total planning is then we got to you know play the show game about what
[49:21] roads one things are coming up do I have at least three minutes to quickly try to
[49:25] go through the rest of the PMP yep I know they look like there's another item so again
[49:30] that's that was I think the main you know talking point wanted to hear what you
[49:35] we're thinking before we go and send survey teams and we're talking to residents, they're like,
[49:39] what are you doing?
[49:40] It's an alley project, right?
[49:41] And they're coming and calling you and I'll ask them.
[49:43] So this has been really helpful for me.
[49:47] Looking at the map, just a couple things I like.
[49:50] Again, you can see the preventative maintenance of the crack ceiling program.
[49:54] Covers a lot of streets, because we've been doing a lot of streets, which is LPROCI.
[49:59] In 28, and it just shows this 28, that might refine the map a little.
[50:03] As you may be aware, the county has to overlapped her court or study has to be completed in 2020,
[50:09] so in their transportation, in their temp, they're planning, you know, for funding and local needs.
[50:14] They have essentially over 28, 29 and 20, 30, the local cost share for Falcon Heights at about $685,000.
[50:24] So we've programmed that in. These are obviously things that will leverage and say funds and other funding sources.
[50:30] But that's something we never want to lose track of because we don't want to just get hit by a belt from the county
[50:34] We do want to plan for that in there whether or not they're
[50:38] You know just throwing some number at it or it's a really refined number
[50:42] We're going to lean into what Ramsey County's tip is you don't know what that includes
[50:46] Well, so for instance in 28 they have split on local between Waterdale and Falcon, I taught a thousand
[50:54] No, I'm not the moment, but like do you know what the 560,000 for the third year in
[51:00] So this is not even done, we don't even know if they're going to start at the 280, so this is a way of John Masatello, they're essentially one of their detectors and their planners, to at least give cities an opportunity to say you should start planning for this because something could be coming down the way.
[51:18] They just give them a number.
[51:23] Yes.
[51:23] essentially the expense they told us over that amount of time in those years.
[51:27] So we'll continually update and plan for that.
[51:30] Just to add to those are accessible amounts, too, right?
[51:32] So the county, one of their mechanisms, they cannot assess.
[51:35] So it's not a power of the county, they cannot assess properties, the city making.
[51:40] And so what will happen?
[51:41] We did this with the Cleveland Project, the county assessed us, and then are the county build
[51:46] us, and then essentially we had a cost sharing agreement with the University of Minnesota,
[51:50] where they paid that.
[51:51] But Cleveland costs the city $1.5 million.
[51:55] We ended up getting $1.495 from viewbound, basically.
[52:02] So it ends up, it's kind of a little bit of a money game,
[52:04] but essentially we can assess that back
[52:06] to properly, first of all, including.
[52:08] But part of it is things that are sort of silly obligations,
[52:13] street lights and things like that nature, right?
[52:17] That they have a cost share with us that's what had it.
[52:20] They currently have a co-share policy, and it's very detailed and in fact all the joint
[52:28] engineers ramps.
[52:30] We have the county of cities, I should say, are working on refining that to simplify the, yes, all that's spelled out. So, when we get to a cost share agreement, there's room or discussion. I don't want to say it's treating those issues, because they have a policy, but they also are not trying to be unreasonable, but they put on cities, and that's what they're actually trying to attain through this update to their policy. They recognize, you know, they're attacking authority, we're attacking authority, but, you know, how big is the city? I'm not much too big.
[53:00] you know, funding me, and I actually had that cool stuff.
[53:04] So I wanted to highlight that section.
[53:06] The only another two row projects currently planned
[53:08] would be prior in 2029, given this condition.
[53:12] It is currently being thought of as a reclaimed.
[53:14] Obviously more geo-tech info like that
[53:16] needs to get done.
[53:18] And then Rose Lawn in 2031.
[53:20] Rose Lawn had originally been scheduled earlier.
[53:23] However, there's obviously been a couple changes.
[53:27] I think coming to Falcon Heights, as far as what
[53:29] could happen to Rose Lawn with the development of Les Polescat, but also this is a project
[53:34] where we're going to partner with our peer-city or sister city, Roseville, and they
[53:39] believe the project, but they, you know, Roseville has some water-made work and some other
[53:43] things that their also hesitates right now in planning for the future because of a lot of
[53:50] different factors. As far as their budget goes, but also the impacts that Les Poles
[53:59] to invest in the new infrastructure on Rose Line.
[54:04] There are two areas I do want to know quickly,
[54:07] that we are tracking that's Folem Street,
[54:08] so this is in the Grove neighborhood.
[54:11] Folem Street and Hoyt to those are,
[54:14] we call Border Street,
[54:15] so we share a jurisdiction with our neighboring city.
[54:18] Folem is Waterdale.
[54:20] Hoyt is St. Paul,
[54:21] I've talked to this city,
[54:23] Edmund, or Manager at Waterdale.
[54:27] There are already kind of looking at that right now
[54:28] see, you know, if they get that in, when they're planning, we'd like to get that out of
[54:32] the schedule, and then I have our back from the pliers at the city of St. Paul, but that's
[54:36] something I'll continue to pursue to see if they have interest in, you know, rehabbing those
[54:42] roads because they're an option.
[54:43] Well, and also, it's a big concern for this area because of Luther's seminary, because
[54:47] that's more traffic is going to come out, so that's where it needs to be addressed.
[54:50] Another kind of tide development, and again, going back to the framework of the PNP is
[54:55] It's not just OCA, we just focus on that and don't look at kind of happening other areas and
[55:02] filming other projects, you know, we do want to take that judgment to come.
[55:07] So I just wanted to get through it because it was probably other roles we got to get to, again,
[55:12] we're in a great spot on what you guys have done over the last, you know, ten, five,
[55:16] ten years has got us into that preventive maintenance, which is just a few
[55:26] That, I appreciate the insights, you know, how you guys are seeing it, so that way, again,
[55:32] a staff, we can look at getting you something or more decisions for the decision makers,
[55:37] the kind of guidance on kind of how you might want to see it.
[55:39] One other one question about the Roseland reclaimed, is there any possibility of moving that option?
[55:45] There is this rose gold delay, what you're pushing to push that, or the reason I ask is a 50% of what you identified there is the U of M property.
[55:52] And that property is going to be, it's currently under one developers thing, and then
[55:58] then at the very little bit it's going to be a bunch of individual lots.
[56:02] It'd be much easier for us to assess the U of M than it is to do individual
[56:08] parcels after they just bought house.
[56:11] So it's a making sense for us to move that project up to...
[56:15] Well, I think it's interesting.
[56:16] It's actually really interesting, though, because I don't know how the development
[56:19] pan up and I'm guessing there's not going to be a lot of translates on Rosalot.
[56:23] That's something we can consider.
[56:25] One of the main drivers for even doing Rosalot, at least from Rosalot's perspective, is they
[56:30] have to do water main work, so based on their budget for water made it when they can
[56:35] time their project.
[56:36] They've been the U of Amor Rosalot.
[56:38] Rosalot.
[56:40] Additionally, St. Paul Regional Water has water made under this road, which they would want to
[56:49] He was going to use St. Poverwood.
[56:52] Roseville does, but they get it from a different source.
[56:55] It comes in at a different point in the Roseville.
[56:59] It goes from there big reservoir in the south of East corner,
[57:03] and at the Booster Station fills it up.
[57:05] So the pint itself, that has that taste roseville that we only need.
[57:12] We just buy it for it.
[57:13] And then we sell it a little bit, right now.
[57:15] We're a whole sale.
[57:17] Safe all holy owns our system, the mining, everything Roscoe owns their system, but you buy water for them, oh, yeah
[57:24] So it'd be hard. I guess it that's the partnership
[57:28] Where if we really push to do it, you know, eight Roscoe would have to be on board
[57:33] But if we did it now, you know, and they want it they need to replace
[57:37] Failing water made in five years. Now we're taking up a road that we just
[57:41] Did some sort of treatment, which would be hard selling point
[57:49] It's on their PMP, their five-year plan is scheduled for 2031.
[57:56] And that's really one of the drivers there is alarming, is that right?
[58:05] Well, maybe a little off topic, but with the developers saying they will do the infrastructure
[58:11] on the Gulf Coast, they work to the standards that our city wants when they put in the
[58:16] roads.
[58:16] Can we set those standards?
[58:19] Thank you.
[58:19] Especially if they were turned them over eventually we would and same for the knowledge and we're timing
[58:24] I agree with the point that the golf course will want to drive some of that if we're looking for example at like
[58:31] Sanitary extension of our line from
[58:34] The balcony woods out to this spot that might also drive that but that might be like a 29
[58:39] Maybe we'll approach it all and say 29 is a better year just based on infrastructure work other stuff at that point and see if that might be able to
[58:47] drive some of that time line as well. But likely not 20 20s, just because we don't
[58:54] also know the full scope of what's needed, there's stuff, yeah, but only 9.
[59:00] Yeah, yeah, I might want to know. Thanks for all your work goodness.
[59:05] Oh, of course. It's really great here. It's fun actually.
[59:08] I'm getting to have a good first set of eyes on the plant and modernize it if you open the hand-to-car side.
[59:15] It's very frustrating, but any feedback is always appreciated and again we'll fall back up with the palliative.
[59:25] You had that last one.
[59:26] You said that this 14 miles of local roads do have how many miles there are alleyways?
[59:32] So 14.1 miles, certainly miles that doesn't put alleyways.
[59:36] in the report we break it down okay so that does look at us yeah and one thing I'd like to
[59:40] highlight is what we're looking forward to next year or over time so we're going to
[59:44] just go okay is um you know what we think of being a measure we think of all
[59:48] asphalt concrete everything right um we have right now streets we have all the city parking lots
[59:54] next year we're going to be adding in the trail systems any locally on the main team trails we're going
[59:59] Thank you.
[1:00:00] As well, so we can start planning for those make-ances, just get a better understanding of their conditions and where they're at.
[1:00:05] That's a great idea.
[1:00:07] That's a steep peak at 2027.
[1:00:09] All right, thank you.
[1:00:11] Thank you.
[1:00:15] Since we're seven o'clock staff has direction and everything that you need.
[1:00:24] We do.
[1:00:25] It's all right, so that's just our general capital stuff. I can talk about those another time
[1:00:29] We're still building out some of those numbers. We just wanted to kind of show the initial look like
[1:00:33] Here's our identified list that they're items that are in a long-term tenure plan. Not all of them need to be done some of them that we're
[1:00:41] I don't even need to it or I guess you guys can act but we can also act, but we just we're presenting of like what's there
[1:00:47] But some of these like zero-turn mowers to keep pushing those out. They're doing great. You don't need to replace them
[1:00:53] but they just come up in our tenure plan
[1:00:55] as we kind of keep on our appreciated assets.
[1:00:58] But what we have a practice of is trying
[1:01:00] to keep it maintained, especially equipment.
[1:01:02] We push equipment beyond its life
[1:01:04] because our guys do a great job of keeping them going.
[1:01:08] So, this was gonna highlight that,
[1:01:10] but take a look, we'll talk more.
[1:01:12] Okay, all right.
[1:01:14] All right, we want to do a good job.
[1:01:16] I'm gonna do it for a little bit.
[1:01:17] All the favor, five, five, five, five, five, six.
[1:01:21] Okay.