Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
These are YouTube's auto-generated captions, not a human transcript — expect occasional errors, especially with names and technical terms.
[0:16]
Good evening everyone and uh welcome to
the village of gold rivers regular
[0:20]
council meeting. Thank you for all
coming out. Um it's wonderful when we
[0:24]
get to see all our bosses out here like
this keeping an eye on us [laughter] as
[0:28]
we go about the uh public's business and
the people's business. So anyways, I'd
[0:32]
like to um take this opportunity to call
the meeting to order and u introduction
[0:38]
of late items. Administrator Rory is
there any late you like to introduce the
[0:41]
the agenda this evening sir?
>> No your worship
[0:44]
» counselors any late you wish to
introduce the agenda this evening
[0:47]
councelor Pringle
>> to the chair. Would we be able to go in
[0:52]
camera please?
>> And what would be the reason for going
[0:55]
in camera? Councelor Pringle
>> some personel
[1:00]
» we could if we could get it seconded and
we're prepared to second that. Councelor
[1:04]
Fawson.
No discussion on it. vote for going into
[1:08]
camera. Everybody's in favor. Cancer
posing. Great. Add that to the agenda at
[1:13]
the end of our meeting.
[1:19]
Holy smokes, there's a lot of pages
here.
[1:23]
We could be here for a while. Okay. And
camera.
[1:32]
[sighs] Okay. personnel.
[1:37]
Done.
Any other late items? Council wishes to
[1:41]
introduce the agenda. Seeing none,
moving on.
[1:45]
Approval of the agenda. The agenda be
adopted as presented. Who can remove it?
[1:50]
Councelor Pickard. Second by councelor
Waymire. Any discussion?
[1:56]
Seeing none, call for the question. All
in favor? Carried. We have an agenda.
[2:00]
Adoption of the minutes. that the
regular meeting minutes from August 4th,
[2:03]
2026 be adopted as presented. Who care
to move it? Councelor Fawson, second by
[2:07]
councelor Wemar. Any discussion? I was
on holidays during that meeting. I like
[2:11]
to watch it on YouTube. I was very
impressed with you guys. You look really
[2:15]
good and you made some great calls, I
think, especially on grants and uh and
[2:19]
the smiles. So, I was um even though I
wasn't there, I thought you represented
[2:23]
the community extremely well. Um other
than the cheerleading pep top stuff, is
[2:28]
there anything [laughter]
Anybody else would like to comment on?
[2:34]
No. Call for the question on favor.
We've got it. We adopt the minutes.
[2:37]
Public and statuto hearing. Seeing none,
moving on. Unfinished business. Seeing
[2:40]
none, moving on.
[2:45]
Delegations. We have a delegation this
evening on water meter 7.1. I'm terrible
[2:52]
at pronunciation, so I hope you'll
forgive me if I get it incorrect, but I
[2:56]
have it as B. Radowski and M. Shenshin.
Am I even am I close?
[3:02]
» If you would like to correct that,
you're welcome to do so.
[3:06]
» Uh, okay. Presenters, uh, I just need
you to come to the mic that's behind the
[3:11]
screen, introduce yourself, and then,
um, yeah, tell us where you live, and we
[3:17]
listen to your presentation. If there's
just one person presenting, or both of
[3:20]
you presenting this evening, are you tag
teaming like going back and forth? Okay,
[3:26]
terrific. Okay, we have a super long
agenda tonight. So, just to make you
[3:31]
aware that are some time restrictions on
what you're presenting.
[3:40]
Yes, please. Ma'am,
[3:47]
» do you need some technical assistance?
Oh, you got it. You're all lit up there
[3:49]
now. Like Christmas.
>> Yes. So we are both trained as EMF
[3:56]
radiation consultants by the geo vital
academy for radiation protection and
[4:01]
environmental medicine in Austria Europe
clinic known for helping thousands of
[4:06]
patients by addressing EMF exposures in
people's home
[4:11]
across Vancouver Island and the
mainland. We have worked with academics,
[4:16]
medical professionals, engineers and
even former European opera star. We are
[4:22]
also co-authors of the book Holistic EMF
Protection Made Easy.
[4:28]
» Okay.
>> Now about smart meters. These units
[4:33]
constantly transmit microwave signals
which increase harmful radiation
[4:38]
pollution in Gold River unlike analog
meters. Ultimately the gain is financial
[4:45]
interest for corporations not for public
health which should be number one.
[4:51]
Thousands of doctors and scientists have
warned again and again that wireless
[4:56]
radiation disrupts communication on the
cellular level and over time the body
[5:03]
can't keep up leading to illness even in
the young population. This radiation is
[5:09]
not benign.
I pose a question. Has Neptune
[5:15]
explained how much additional radiation
burden their smart meters will impose on
[5:21]
our community and the environment? If
not, why not?
[5:27]
Shouldn't council be making decisions
based on independent scientific
[5:32]
knowledge, not vague assurances from the
industry lobby
[5:38]
since independent experts like us
>> are not connected to the profit-driven
[5:43]
wireless industry. We would be happy to
make an educational presentation to the
[5:48]
new council to avoid any regrettable
decisions in the future regarding
[5:54]
further expansion expansion of wireless
technology. In conclusion, our message
[5:59]
is simple. Let's ensure council
decisions are based on independent
[6:04]
science, not industry lobbying. Thank
you.
[6:08]
» Thank you very much for your
presentation.
[6:11]
» Oh yeah, now we have
[6:23]
Yes, please.
[6:29]
scientific controversy. It tells me that
scientists haven't figured things out
[6:33]
and it means we can
>> case after case after case of malignant
[6:39]
blastoma lymphoma metastatic carcinoma
but also
[6:45]
a link between brain cancer and usage.
So much so that thankfully I wasn't a
[6:51]
loose gun anymore. So it makes no sense
to argue that you can use a radio
[6:57]
frequency radiation to put chemotherapy
into brain and then say that but by the
[7:02]
way there's no negative effects.
>> It would be very nice to do studies
[7:06]
before it is installed and then study
patients again after they have been
[7:10]
exposed to telephone
>> and why do we allow 100 times more
[7:15]
radiation exposure to our citizens and
our children than other countries do?
[7:20]
But when you look at the data and you
look what's happening with infertility,
[7:23]
cancer, DNA damage, but just seeing
these young people that were seen
[7:27]
already,
>> you talk about the longer you can delay
[7:30]
portable screens for your child, the
better.
[7:33]
» If you interview these patients, they'll
tell you about cell phone loose next to
[7:37]
their head is that the physicians are
not trained to answer these questions.
[7:43]
Now with co we all have experienced some
form of social isolation but our EMF
[7:48]
patients especially feel socially
isolated. EMFs act on bacteria and their
[7:53]
host in a stressful manner.
>> EMF source removal or avoidance are the
[7:57]
best way for creating a low EMF
environment. If that does not work the
[8:02]
most effective solution is to shield
their home.
[8:05]
» We need to listen to the scientists. We
need to believe the scientists that are
[8:09]
doing the EMR research. Wireless
radiation isn't benign. It's a blessing
[8:15]
and it's also a curse.
>> If they're not aware of this
[8:18]
environmental pollutant and the
consequences of this environmental
[8:22]
pollutant, they're going to misdiagnose
their patients. Dr. Ray said to me,
[8:26]
"This is your generation's tobacco."
You're He told me this 10 years ago, and
[8:30]
I think he's right.
[8:40]
Uh so now it's my turn here. This EMF
medical conference was very interesting.
[8:46]
I attended this as well. It was in 2021
and I was shocked to hear about the toll
[8:53]
that EMF exposure takes on patients
young and old. They they actually showed
[9:00]
the SC medical scans and we heard the
stories. It was horrific.
[9:06]
I'd like to point out that we are
presenting what we presenting is based
[9:10]
on scientific evidence and years of
medical research not hearsay or opinion.
[9:17]
It is backed of by healing thousands of
patients who found no healing through
[9:22]
mainstream medicine.
Uh please be read both sides of the
[9:28]
international doctor's appeal. Even the
back has text is small but it's very
[9:33]
interesting.
To be clear, radio frequency is
[9:38]
radiation
which is emitted constantly by all
[9:43]
wireless technologies such as cell
towers, smart meters, Wi-Fi, etc.
[9:50]
Let me demonstrate a radiation exposure
with the cell phone with a tech phone to
[9:55]
give you a glimpse to what chronic
radiation exposure is all about.
[10:06]
This is a typical deck phone many people
have in the home.
[10:20]
I have a reading of well over half a
million.
[10:28]
I can go back.
[10:47]
So this gives you an idea. This is
something that none of the telecom
[10:53]
industry does. It surprises me. The
engineers
[10:59]
Yeah. The the engineers
[11:03]
uh that these big companies have, these
corporations, they failed to do so.
[11:10]
So
uh on this
[11:12]
» I don't think the gallery can see your
presentation.
[11:15]
» Well, I'm just going to leave this. I
will move it forward so you can see it
[11:19]
better.
[11:31]
I would think the gallery would be
really interested in seeing it that well
[11:34]
we'll listen to your presentation but
I'm sure they'd be very interested in
[11:37]
seeing what you're saying
[11:42]
» all about patients
>> yes
[11:46]
» this because of this you're busy and you
should
[11:50]
» so this is a typical home I not speak
about geopathic stress
[11:56]
But this is very typical. We even
checked homes in Vancouver.
[12:01]
High-end homes are supposed to be smart
homes worse for anyone. Here for
[12:07]
instance, you have the water smart meter
always the ground. Unfortunately,
[12:16]
water and copper are in extreme
contacttors. It travels through the
[12:22]
ground into the house.
That's how it works. In fact, this
[12:29]
radiation, we have other meters. They
are we touch them. They're very
[12:34]
expensive.
And uh when you touch them, it shows
[12:38]
your radiation level inside your body
which is absorbed.
[12:43]
So,
here's a new car.
[12:47]
They're loaded with transmitters today.
This goes throughout the whole house.
[12:54]
Neighbors wireless boosters. Some of
them over well over 200 meters or 2,000
[12:59]
ft.
Baby mones industry likes to say, "Oh,
[13:04]
it's as safe as baby." I was present in
one of those events.
[13:09]
And then they say, "It's a safe. There's
nothing safe about a baby. It has the
[13:14]
same frequency at that device."
And that device actually has been banned
[13:20]
in Germany and in medical institution in
senior res
[13:26]
small children and children that people
that are unwell.
[13:32]
They said it should not be in the
building.
[13:36]
Here's an electric smart meter. I think
by now everybody would know, but we told
[13:41]
they only emit once in a while. It's not
the case. They go nonstop. They like to
[13:46]
meet many times even the seat even the
uh
[13:51]
supervisor
I can be here I can pick up the smart
[13:56]
meter here are the bedrooms baby
monitors are the same smart appliances
[14:02]
are problem microwave radiation actually
goes through your whole house typically
[14:09]
go back up go to the other end of the
house and you make a presentation
[14:14]
cell towers
[14:16]
They they proposed on the cell tower. We
already our home faces the cell tower.
[14:21]
We have nearly 300 micro three no
300,000 microwatts per square meter.
[14:31]
1,000
microwatts per square meter. that
[14:36]
doctors appeal in that they say leave
the area at 1,000.
[14:44]
We we spend thousands of dollars to
share a house because we look directly
[14:48]
at this town. We we looking three sector
antennas hunting directly. We have a
[14:54]
beautiful big that we cannot use.
When I spend too much in front of the
[14:59]
house, I feel unwell. When I just water
the plants, I feel unwell.
[15:05]
unacceptable. And then Marus was going
to insult another one. So, let's hope
[15:10]
this would be avoided with the next
council. Here's Wi-Fi.
[15:15]
This goes through the house. Tablets,
they're not quite as bad, but they still
[15:21]
live constantly.
You should always avoid them if you can.
[15:27]
The neighbors Wi-Fi. Some of them have
boosters. They can be down here and
[15:31]
check the information from home.
[15:40]
So gaming consoles children play. Many
boys play for hours including my
[15:46]
grandchildren s
they're horrendous. Laptops are also
[15:53]
wireless devices because they
communicate back and forth with all this
[15:57]
technology.
TVs also are the same. It comes you can
[16:04]
go back and forth and all of these you
only solve one device.
[16:11]
Just think at all of these together
in com in combination and industry like
[16:19]
this like the smart me industry or
whichever it is is that it's safe. They
[16:24]
base it on one meter in their lab. It's
never
[16:29]
they have to connect all of them. They
have to be functional. And you're
[16:35]
dealing with dirty electricity.
They're called harmonics and
[16:38]
distortions.
And they creep. So anything metal, they
[16:43]
can come into your house.
You have to put filters to to reduce
[16:49]
that. So that's why so many people often
do that.
[16:54]
So that's basically uh so this will give
you just an idea and uh lastly
[17:03]
uh industry proudly FSIA
the product of these devices
[17:10]
that they penetrate walls as well. Of
course they failed to mention that also
[17:16]
penetrates your body and the bodies of
your children.
[17:21]
Remember when you touched the rabbit
ears of the old TV sets
[17:26]
and how the perception suddenly
improved. This is because our bodies are
[17:30]
so superb conductors due to the high
water content of our bodies.
[17:39]
So I'm almost done.
U take the time and read the article I
[17:46]
sent all of you by Norman from Harvard
Press.
[17:52]
called the captured agency.
It is fascinating. It reads like a
[17:57]
criminal novel. How the Federal
Communications Commission is dominated
[18:02]
by the industries it presumably
regulates.
[18:06]
And I can say when dealing with the
wireless industry for several years that
[18:11]
Canadian corporations are no less guilty
in the betrayal of the public.
[18:17]
They gaslight the public because they
know nothing. Nobody has an if meter. No
[18:22]
one.
If you have family members or friends
[18:26]
who are unwell or those with children,
please pass this information on to them.
[18:33]
» Thank you very much for your
presentations. Counselors, do you have
[18:36]
any questions I'd like to address to the
presenters? Are you willing to take some
[18:40]
questions if there is any?
>> Of course.
[18:44]
» Not seeing any. Thank you very much for
your presentation this evening. very
[18:48]
informative
>> and thank you for coming out
[18:51]
» and thank you very much for your service
for this last year last years.
[18:55]
» You're welcome.
>> On to the next item, administrative
[19:00]
reports 8.1 grant partnership
opportunity disability alliance of
[19:04]
British Columbia. Um moved that the
village of Gold River pass a resolution
[19:07]
in support of being a partner for Gold
River Community Services 2026 disability
[19:12]
alliance grant application which
councelor to move that councelor way
[19:16]
second by councelor
Pickard. Any discussion
[19:28]
start us off councelor Picker. Thank
you.
[19:33]
Thank you so so much to the chair and I
just want to say thanks to um our
[19:38]
partners for bringing this to us uh at
the Gold River Community Services. This
[19:44]
is um yeah an exciting thing for uh
seniors. Councelor Waymire, I had a
[19:50]
chance to sit down with the revelers and
a lot of them expressed some concern of
[19:54]
uh what to do in case a disaster struck
and if anyone knew where they were and
[19:58]
how they would get their medicines and
the people with no mobility, how they
[20:01]
would um be helped if there was an
emergency. So, this grant's an exciting
[20:05]
opportunity to hopefully continue some
partnerships with the SRD, Sean Kumman,
[20:09]
who's been awesome and um I am really
proud of our all the work that Gold
[20:15]
River Community Services does and would
be happy as a village to partner with
[20:18]
them. So, we'll be supporting this
application. Thanks.
[20:23]
» Thank you, Councer. Anybody else care to
comment?
[20:30]
Everybody's happy with it. I'm really
happy with it. I love to see um that
[20:35]
resource available in the community to
provide that information and um that's a
[20:40]
and I think it's terrific partnership
with the different areas and and having
[20:44]
that coordinator be available in our
community to help these folks out. So
[20:47]
yeah, and $40,000
um if the province wants to timber if
[20:52]
the province wants to provide that so
that we can that we can offer that
[20:55]
service that's great. It doesn't cost
our local taxpayers anything. It
[20:58]
enhances a service
people with disabilities. So I'm all in
[21:03]
favor of it. Um no other discussion then
call for question. All in favor carried
[21:07]
unanimously.
8.2 Build community strong fund local
[21:13]
impact stream. moved that the council
approve submitting a grant application
[21:16]
to the build community strong fund local
impact stream to complete mechanical
[21:20]
systems upgrade at the Anfake aquatic
center as outlined in the climate ready
[21:24]
infrastructure service CIS study
preparation for polar engineering
[21:28]
pathway B that's a tongue twister
[laughter]
[21:34]
first of all who would like to move it
council mayor second by councer
[21:39]
discussion how we start off with our um
staff
[21:43]
They can speak to the report.
>> Director of operations, Dr. You care to
[21:48]
address your report, sir?
>> Yes. Is this on?
[21:51]
» Your mic doesn't look very red to me,
sir.
[21:57]
» Hello. Oh, yeah. [laughter] First thing.
One, two, three.
[22:00]
» Um, yeah. I guess the the first thing I
should do is thank Chelsea for kind of
[22:04]
doing the lion share of this. And then
when I picked this back up, um, I went
[22:07]
and, uh, made an error on the
recommendation. It should be uh pathway
[22:12]
A, not B.
>> Um, pathway B, there's three things
[22:16]
included in pathway B that are not
necessarily the highest priority ticket
[22:20]
items for us. The showerheads can be
done internally with staff. Uh, the de
[22:24]
super uh dehumidifier and the um the um
the ice plant heat recovery over on the
[22:32]
curling side arena. Um there there is a
system over there that is not that
[22:36]
terribly old. And so uh pathway A was
the like the intended preferred
[22:41]
direction.
>> Just for a point of order CA we've made
[22:45]
a motion accepted the motion. We're
having discussion on that presentation.
[22:48]
It is been read out as being do we need
to go back and address that sir or can
[22:53]
we just do that as administrative
change.
[22:55]
» Uh if you can just do it as a friendly
amendment if the mover and second are in
[22:59]
favor of the minor amendment.
>> Friendly amendment moved by councelor
[23:02]
Ramire. Second by councelor Pickard. All
in favor of friendly amendment changing
[23:07]
it from B to A for discussion. Thank you
sir. Carry on.
[23:11]
» Yeah. Otherwise um the report is as
described in there. This is about energy
[23:16]
recovery uh some grants um that are that
are plausible to help uh the the this
[23:24]
project audit energy audit report or
study was undertaken with the lens of
[23:28]
looking at equipment that was going to
be aging out that was either to be
[23:32]
identified or already identified in the
5-year capital uh budget. And so it
[23:36]
looked at how do we renew uh assets and
infrastructure and and save operational
[23:41]
funds on the operational side at the
same time. And so with that being the
[23:46]
context, the other uh thing that's
affected by that switch from B to A is
[23:50]
the uh financial implications. They are
actually reduced somewhat. uh they go
[23:56]
from a outstanding balance of 1,41
uh,000417
[24:02]
to $823,000446.
[24:06]
So um that um very briefly explains the
difference between the two and the
[24:13]
report otherwise um kind of speaks for
itself and then the um the um what do
[24:19]
you call it the climate ready
infrastructure uh service study was
[24:23]
attached uh for information
Um, so I'll leave it maybe to council if
[24:27]
they have questions pertaining to the
report or the project or the grant.
[24:35]
» Counselors, do you have any questions
you want to address to the director of
[24:37]
operations?
[24:42]
Councelor Way.
>> I think first and foremost, uh, thank
[24:47]
you and Chelsea and staff for all the
work. Um, this is a unicorn of a grant.
[24:52]
Uh these don't really come around all
that often for our infrastructure and
[24:56]
you know getting her pool and everything
all upgraded and up to snuff. Um I guess
[25:04]
um not that I'm necessarily thinking
this way, but this grant application uh
[25:09]
if we were successful, does that tie us
to that dollar amount or
[25:17]
um like would we be locked in?
director of operations doxy to respond
[25:22]
to that
>> if I may through your worship. Um I'm
[25:25]
not certain until we really finish the
application and um and then typically
[25:30]
upon successful u successfully being
recommended or attaining the grant
[25:35]
there's a grant agreement uh process and
then the details are flushed out during
[25:39]
that that time and period.
>> Well, councelor Mary.
[25:42]
» Uh very cool. Um that's perfect. And as
a second question, um I recognize time
[25:49]
is very short. The deadline is very
soon. Um [snorts]
[25:55]
would um
would reaching out to MMFN uh be an
[26:02]
opportunity for us to get a letter of
support to strengthen this grant
[26:05]
application? Um I'm again time is short.
Um turnaround time might not happen, but
[26:11]
is that a possibility?
>> Director of operation
[26:14]
» again if I may through your worship. Um
it is a possibility. um whether or not
[26:19]
there's sufficient time and and
capacity, but reaching out to our
[26:22]
neighbors is always a good um like never
never hurts a grant application.
[26:29]
[snorts]
>> Just for my clarification and uh for the
[26:32]
galleries understanding people are
listening uh the grant application is
[26:35]
that um it's 50/50. Is that what it is?
It's whatever the final dollar amount is
[26:43]
we would pay 50% of it and the province
would pay 50% of it. Is that the grant?
[26:48]
» If I may, uh, it generally is. It says
up to 50% and a million dollars. So, it
[26:54]
um it it may vary or flux or whatever
from project to project in the review
[27:00]
and number of applicants, but in general
speaking terms, yes, $50.
[27:05]
» Great. Because that's how we need to do
business. We talked about that early in
[27:09]
our term that if we wanted to be
financially responsible and the tenants
[27:12]
of that would be that we would not
consider projects unless we had grants
[27:15]
attached that would um supplement the
financing of those we've got paid dollar
[27:21]
for dollar for the projects we're doing
just can't afford it and I think you
[27:25]
know the community should understand
that if you look at the fiveyear
[27:28]
financial plan that this council had
passed you know for its projects I don't
[27:32]
have the exact number because I'm not an
accountant but um it's over $9.2 $2
[27:36]
million worth of projects over the next
five years that are critical to the
[27:40]
operation of this this um this community
if we want to maintain our
[27:44]
infrastructure, operating systems, our
equipment. And there's more like about 6
[27:48]
something 6.5 million that have been
that have procured in grants. So that
[27:53]
allows us to do the things that you're
talking about like right now to um
[27:58]
upgrade the systems at our facilities,
our recreation facilities and u maintain
[28:03]
the integrity of those buildings and
keep them operational. if we didn't have
[28:06]
grants like this and people like
yourself and uh our mech dev officer and
[28:11]
our CEO chasing these down because you
guys got jobs already and we ask you to
[28:16]
do this off the side of your desk but
without the millions and millions of
[28:19]
dollars that are coming in from staff
chasing down these grants we would be in
[28:23]
big trouble big trouble we couldn't
afford it and we would suffer the
[28:27]
consequences because things would be
burking down and we wouldn't be able to
[28:30]
do stuff so yeah I'm very grateful for
all your efforts here and Um and the
[28:36]
fact that um we even have money in our
reserves, it can be attributed to folks
[28:40]
like councelor weight and his generation
putting money away in the good times so
[28:44]
that here we are in the bad times.
There's some money in the accounts that
[28:47]
we can do stuff with and we've managed
the money well so that it we haven't
[28:51]
depleted those reserves so that we can
actually pay our 50%. Because there's a
[28:56]
lot of communities out there desperate
for grant money, but they're out of the
[29:01]
game because they can't pony up their
50%.
[29:06]
So, they don't get to look at this
million-doll grant and the 50% of it.
[29:10]
They
they don't have that money in the
[29:13]
reserves to be, you know, to to apply
for this. So, um that's a soap box, but
[29:18]
I think it's important for public to
understand that um the reason that Gold
[29:22]
Rivers surviving and making it and not
looking at other communities as because
[29:27]
the efforts of folks like yourself were
going out and hustling those grants and
[29:30]
making these um project or upgrades um
for our critical infrastructure
[29:35]
possible. So, thank you guys for your
efforts and like I said um if it doesn't
[29:39]
have a grant attached to it, I don't
want to see it. [snorts] So, it's nice
[29:43]
that uh you guys have found some grant
money because there is like council was
[29:47]
saying, there is no grants. And all the
time that I worked for the village
[29:50]
starting in 97, they simply said, no
grants for recreation facilities. No,
[29:56]
no, no, no, no. Don't even bother. We
don't have grants for recreation
[30:00]
facilities. We couldn't get a penny out
of the province or the feds. So, I don't
[30:04]
know where you guys beat the bushes, but
if we got a million dollars worth of
[30:08]
stuff to do down there and you found
$500,000 in grants, I compliment you
[30:13]
because in my time doing that, beating
the bushes and finding grants, I never
[30:18]
found a penny for recreation facilities.
So, thank you very much,
[30:24]
um,
Councelor Pickard.
[30:28]
» Thank you to the chair. Thanks for your
thoughts and I want to echo councelor
[30:31]
Wayer and Mayor Lot and congratulations
to staff on finding a grant for some
[30:37]
mechanical upgrades and operational
costs. As we say, it's always a
[30:40]
challenge and very hard to find. So, and
we know how important the rec uh center
[30:46]
uh recreation and Jerry Morgan are to
the community from from little kids to
[30:51]
seniors and everyone in between. We we
know that that's a big um a big asset
[30:56]
for the community and attracting
families and keeping them here. So, I'm
[30:59]
really glad to see us being proactive
about maintenance there and just
[31:03]
replacing some um end of life's assets
and also looking at ways we can reduce
[31:08]
energy and greenhouse gas usage. So,
that's awesome. And another huge plus is
[31:13]
just being proactive and having
everything modernized and energy
[31:16]
efficient and up to date um might help
some some kind of future investments. We
[31:21]
had a group come to us that wanted to do
a summer bond spill for curling and and
[31:25]
staff was a bit of an issue getting the
ice in early but also equipment and not
[31:28]
not really being modernized and
operating effectively that wouldn't be
[31:32]
able to handle that moisture and the
heat in the summer. So maybe having our
[31:35]
equipment up to date will attract maybe
a broader range of groups there, more
[31:40]
more teams coming up for hockey, more um
usage of the pool and um yeah, I know
[31:45]
the pool as councelor Wayer said too
also supports the MFN community know TAS
[31:50]
residents come and use a lot and Strath
Kona Park Lodge there sometimes there in
[31:53]
the summer in the winter time. So I
think it is a really big benefit to the
[31:57]
communities all around us too. So thanks
for um all your work finding this grant
[32:02]
and good luck submitting on the 11th.
Thanks.
[32:05]
» Thank you guys pickard. Just another
question. Director Paper Doxy is this um
[32:10]
report from polar engineering that I
spent like seven to 12 hours reading and
[32:14]
trying to understand and is this paid
for by grant or did we pay for it?
[32:19]
» Um again if I may through your worship
the report itself was actually funded
[32:22]
through a grant at 100% level. So, and
it was geared around um helping
[32:27]
communities that necessarily didn't have
um the in-house expertise um pursuing
[32:32]
energy operational savings and of course
greenhouse gas reduction. So,
[32:36]
» what would it cost the folks in this
room and our community if we had to pay
[32:39]
for that grant? What was it to pay for
this report?
[32:43]
» I I might have missed that with all the
thousands of numbers I went through
[32:46]
there on your that report.
>> Don't quote me. I think about a 30
[32:51]
$40,000 study.
>> Yeah. So I thought something like that
[32:55]
terrific
study and engineering report done by
[33:00]
grant and uh the repairs critical
repairs to infrastructure and operating
[33:04]
systems half on the grant. I'm a happy
man.
[33:09]
Uh yeah any other discussion any other
questions for director of operations
[33:13]
doxy or croy?
No. I'm seeing any um call for the
[33:19]
question to accept as amended.
All in favor? Done.
[33:27]
Are you still Are you still sitting
there dro? It looks like you have a few
[33:31]
reports here. [laughter]
>> Yeah, might as well. Yeah.
[33:36]
Uh Gold River Aquatic and Sports Center
climate ready infrastructure study. that
[33:41]
the move that the Gold River Aquatic and
Sports Center climate ready
[33:45]
infrastructure study report be received
accepted for information. Who care to
[33:49]
move it? Councelor Fawson second by
councelor Pringle. Discussion
[34:11]
Everybody's really happy with that one.
Okay.
[34:20]
Me, too. But I'm biased. I'm a pool guy.
Been one for all my life. So, I thought
[34:24]
I'd kind of just sit back and let other
people take the lead on this because I
[34:27]
because I'm unabashedly biased about
this. Invested fully invested in this
[34:32]
one.
I I am curious. So, director of
[34:37]
operations, Docs, I see in your report
that you were you were you were looking
[34:41]
for gremlins in your HVAC and your
mechanical systems. Did you happen to
[34:46]
find any gremlins there, sir?
>> In your in your report, I see that you
[34:51]
mentioned that in the things that you
did over the summer at the aquatic
[34:54]
center there was gremlins running
around.
[34:56]
» Um, we are still some of them are being
solved and some of them are still
[35:01]
ongoing. It's a bit of a combination
having managed in the at the uh
[35:07]
recreation the aquatic center you're
probably familiar with just you know
[35:11]
things like the control systems not
working or HVAC systems running when it
[35:15]
shouldn't be
hot water where it not where it should
[35:20]
be just yeah it's it's a complicated
building [laughter]
[35:27]
» and I understand that money's already
been allocated but you're looking for a
[35:30]
little bit more. Is that correct?
>> Is this uh
[35:35]
» that would be a subsequent uh report
coming up on the agenda next.
[35:38]
» Thank you, sir. Getting ahead of myself.
Okay,
[35:42]
councelor Pickard.
>> Thank you chair and um yeah, thanks for
[35:48]
uh you guys finding the grant to do this
study and appreciate and I think it's
[35:51]
been good learning for us as we go along
when we're always saying, well, why do
[35:55]
all these reports and we have reports on
reports? But just showing that this
[35:58]
climate ready infrastructure service
study prepared by Polar kind of was a
[36:03]
springboard that allowed us to identify
where we needed our upgrades and repairs
[36:06]
so we could build a really strong
proposal for the build community strong
[36:10]
fund. So I think it's a good kind of
lesson that sometimes like we got the
[36:14]
read up for our ECA report and and study
and so hopefully that we have that
[36:20]
professional report done and then we can
use that to go ahead and find grants for
[36:23]
the the priorities or upgrades
identified in those reports. So thanks
[36:28]
for the foresight in getting that done
and making us eligible for this build
[36:31]
community strong fund grant.
Thanks.
[36:34]
» Thank you councard. Anyone else call for
the question? All in favor?
[36:40]
Cool. And now the meeting. Move that
council direct staff to pursue projects
[36:45]
and funding in support of the
recommendations through infrastructure
[36:48]
renewal.
Council
[36:52]
moved it. Second by councelor Pringle.
Discussion.
[36:57]
I love it.
All in favor call for question. Yeah.
[37:02]
Good.
That's why I like being a politician in
[37:07]
this community.
[37:10]
» Yeah, they value health and wellness and
uh all the other things that go with
[37:15]
having those facilities.
Um 84 Anidic Aquatic and Sports Center
[37:22]
main [snorts] pool boiler renewal. Move
that the council approve a budget
[37:26]
amendment drawing upon capital equipment
reserve accounts in the amount of 65,000
[37:30]
and directing towards the capital
renewal of the pool boiler and that
[37:35]
council authorized staff proceed with
replacement of the main pool boiler a
[37:38]
cost of not more than 240,000 care to
move it councelor way second by
[37:42]
councelor Pringle discussion the same
question I had for you before
[37:47]
director of operations stocky when I was
a little ahead of myself can you explain
[37:51]
the um you have money budgeted already
in the existing budget for 2026 and um
[37:57]
um for doing the job and you're going to
consolidate that money and you just need
[38:01]
another 65,000 in order to get worked
in. Am I am I summarizing it correctly?
[38:06]
» If I may through your worship, you're
you're pretty close. Um I actually had
[38:10]
we had uh
$125,000 in the capital budget and then
[38:16]
I actually made an air and I had $50,000
in the operational budget for the same
[38:20]
thing.
>> Okay. Um, so as it turns out, uh, the
[38:23]
boiler is, um, more money than either of
those. Yeah.
[38:27]
» So, the air works in this instance in
our favor and we still do need $65,000,
[38:32]
um, and recommending to transfer it from
the capital reserve.
[38:36]
Um, I guess like also point out within
the report though that um, this is a
[38:41]
good example of having having the study
um, it was completed back uh, near the
[38:45]
year end. Um, but we we we wanted to
have a refrigeration because as soon as
[38:51]
we brought the study to to council for
information, we knew it was going to be
[38:54]
followed up with uh requests for
information around uh the budget and we
[38:58]
wanted to make sure in the boiler
because it had also failed earlier in
[39:01]
the spring and we needed to get a
refrigeration contractor kind of lined
[39:04]
up. So, this is a good example of um
just needing to have all the layers kind
[39:08]
of like put into a into a row for it to
make sense to bring before council, but
[39:13]
we do need the main boiler to be
renewed. Um it um it's described in the
[39:18]
in the report. It failed in the spring.
We um we jigged some of the plumbing
[39:23]
over from the leisure pool boiler to
circulate the the water from the leisure
[39:27]
pool or from the main pool through the
leisure pool boiler. Um but it involves
[39:31]
manually valving open and valving closed
uh the different circulation systems and
[39:37]
it was able to maintain uh within about
2 degrees of the temperature target
[39:42]
temperature but it it will not be able
to there's not enough BTU power there to
[39:46]
to to heat both both uh bodies of water
from uh from a ground cold uh standing
[39:53]
still so to speak. Um so we do need to
get the boiler going. Um, and that's why
[39:58]
they ask for the $65,000. And that is
this boiler that's in here is in line
[40:03]
with what's being recommended and
what'll be being applied for. It is a um
[40:08]
what do they call it? A condensing uh
hydronic uh boiler. So, it's a separate
[40:12]
circulatory system from right now the
pool body water goes through the uh the
[40:17]
heat exchanger within the boiler and in
the new system it'll be heated through a
[40:21]
separate heat exchanger. Um, so the the
liquid going through the boilers is
[40:25]
actually a kind of a a straight tap
water, glycol or like some other liquid
[40:30]
besides the pool body water. So it won't
have quite the chlorine and uh uh
[40:35]
exposure. They they last much longer. Um
and um that's about all I know on that
[40:40]
for right now. [laughter]
>> That's a lot.
[40:42]
» The report says it all.
>> That's a lot. That's triggered.
[40:47]
Thank you through the chair and thanks
again director DXY for uh your staff
[40:52]
doing all their creative rigging up
plumbing all throughout last year. I
[40:55]
know they had challenges and we go to
the pool lots with my daughters and I
[41:00]
know there was some disappointment with
the community of all the the temperature
[41:03]
fluctuations and some seniors and and
kids getting packed up and the boiler
[41:08]
issues and temperature. So, I appreciate
your staff did the best they could with
[41:11]
aging equipment. And I also was
wondering um you know, if this is
[41:16]
included in the building community
strong fund grant, does it have to be
[41:18]
exclusive and do we have to do this
first? But director, administrator Roy
[41:22]
and I chatted today and he mentioned the
urgency and to get lifeguard staff and
[41:26]
to ensure that the pool opens in time.
It's a matter of kind of urgent time to
[41:30]
get it going for opening day, October
5th. So maybe we can include it as a
[41:34]
retroactive expense of the grant. would
usually know, but uh and if not, thanks
[41:38]
for your guys' foresight and all your
guys' work and hopefully we can get it
[41:42]
in and temperatures up to standard and
the hot tub hot for the opening day.
[41:47]
Thank you.
>> Thank you, Councelor Pickard. Um Council
[41:52]
Remmer,
>> yeah, I guess at the heart of it, the
[41:55]
boil or pool needs a boiler now and uh
placement that staff's recommending um
[42:01]
it's fits with the rest of the what is
it called? The CIS study. Um so I have
[42:06]
no particular qualms with this. Uh it's
a unnecessary
[42:12]
evil to uh pay that money but at the
same time uh we want to you know have
[42:16]
our pool up and running in October. So
I'm all for moving forward with this.
[42:21]
» Thank you Councelor
[42:25]
Fawson.
>> Thank you through the chair. And just a
[42:28]
a question through the chair to our
director of operations. Um, so if this
[42:33]
passes tonight, then is the boiler going
to be installed by October 5th?
[42:38]
» Director of operations, Oxy.
>> Um, I can't guarantee it, but that is
[42:44]
that is what is um uh loosely promised
by the refrigeration company. They they
[42:49]
say that the one that they're spec is
compliant with what's being recommended,
[42:53]
but also available on the island with
with readily accessible parts. And um so
[42:59]
it should be I know that's a strange way
to answer.
[43:04]
» That sounds like you could be a good
politician to me.
[43:11]
» Yeah, just a secondary question to our
director of operations. Um knowing that
[43:16]
um what is the how many days will the
pool be shut down in order to replace
[43:20]
this boiler?
>> Director of operations. Officer, you're
[43:24]
shut down right now, correct? Yes, if I
may through your worship, the the goal
[43:27]
would be to have this done prior to
opening. So,
[43:30]
» what's your projected oper opening date?
Beginning of October.
[43:36]
» It's October 5th. It's in the next
report. [laughter]
[43:38]
» Yeah. Just testing.
>> Good. Councelor Fawson, do you want to
[43:45]
explore anything else or are you good,
sir?
[43:49]
» You're good. You're welcome.
Any
[43:54]
other discussion on this item?
Um, I'll just weigh in because I never
[43:59]
had an opportunity to really say
publicly my express my sentiments and
[44:03]
thanks for um yourself and your staff
for showing so much creativity and
[44:08]
innovation last year. I thought when it
I discovered that the boiler was down,
[44:12]
being a practitioner, that would mean
that the main pool was going to be down
[44:15]
for the operating season until you could
get your boiler and um you would only be
[44:19]
able to operate your leisure pool off
your leisure boiler and your hot tub off
[44:23]
your hot tub boiler because there are
three separate systems there. But um
[44:26]
through I guess your [laughter]
your creativity and um and and your
[44:34]
perseverance, you found a way that you
could uh get that leisure pool boiler to
[44:38]
maintain temperature in leisure pool as
well as main pool so that we could keep
[44:42]
that facility available to the
community. And I know that um when that
[44:45]
facility is open to the community, the
health and wellness of the community and
[44:48]
the overall betterment of the community
is being realized. So I I I do recognize
[44:52]
that and I do appreciate that and on
behalf of myself, council and the
[44:55]
community, we do really appreciate those
efforts because um our pool without um
[45:00]
you know only partially open and during
operating season would have been would
[45:04]
have been yeah really diminished what we
um the services we operate in the
[45:08]
community and uh yeah I'm ready to go. I
just like I was looking at your CRS and
[45:14]
uh that grant application and the
reports and everything. It looks like
[45:17]
the two other boilers that you're
planning on replacing, the leisure pool
[45:20]
and the hot tub are operate on the same
system as the main pool boiler. So, we
[45:25]
won't be having to reconfigure anything
because that's the evolution, right, of
[45:30]
the that boiler replacement program. All
three are going to operate on the same
[45:34]
basic principles. We're not going to
have main pool being different from the
[45:37]
other two that you want to replace under
the CIS.
[45:40]
» Uh you're you're correct, Arthur. Um I I
I might be could or should add that um
[45:46]
some of the headworks uh plumbing is
part of the main pooler pooler pool
[45:50]
boiler installation that we're proposing
here um those headworks are done and
[45:54]
installed. So um integration into uh
another boiler for the leisure pool will
[45:58]
be be no problem. So yeah great. So
folks okay with giving director of
[46:06]
operations an extra 65,000 to get the
job done before so we can go put the
[46:10]
pool in October. Terrific. Any
discussion on it? All good. Call for a
[46:14]
question. All in favor? You have your
$65,000.
[46:18]
Director of operations, Oxy. Looking
forward to seeing being in the main pool
[46:21]
on October the 5th. Hot main pool.
[laughter]
[46:26]
» Thank you, sir.
[46:29]
U
Nish Park Design. Holy smokes. Director
[46:33]
of operations. Doctor, you got like how
many reports you got in this thing?
[46:38]
[laughter]
Oh, this I think this is a record for
[46:42]
the amount of reports staff reports that
we got from one staff member. Um 8.5
[46:47]
Nish Park design options that Nymphish
Park design options report be accepted
[46:52]
for information. Who care to move that?
Councelor Fawson second by councelor
[46:57]
Pringle. Discussion
[47:03]
councelor Fost.
>> Thank you to through the chair. I just
[47:06]
wanted to say thank you to staff, but
also to um just this has been a long
[47:12]
time coming. I think we as council were
working towards this uh pretty much four
[47:16]
years started four years ago. So I know
our our community has been wanting to
[47:21]
see the plans, wanting to know what
we're going to do. And I think by
[47:25]
directing our staff to okay, let's go
out and get professionals to u look at
[47:30]
this and give us design ideas is great.
I think it's um part of what we need to
[47:36]
do to be physically responsible to make
sure that whatever we do is going to be
[47:40]
uh one beneficial to the community but
also to uh financially responsible. So I
[47:45]
um really look forward to seeing which
option we choose. I already have picked
[47:51]
mine but I also want to do some tweaking
as well. I I don't think it really meets
[47:56]
neither all three do neither of the
three do um I think directly uh deal
[48:02]
with what I've heard from our
constituents.
[48:05]
So, but I am very thankful for this
report and I know that we can uh move
[48:10]
forward with this finally. So, thank
you.
[48:16]
» Thank you, Cra. Um again, director of
operations doxy the $500,000 over budget
[48:22]
for the rehabilitation of our nimish
park by this council. Where'd that money
[48:27]
come from, sir?
[48:32]
» Um actually maybe I can defer that one
to uh
[48:36]
talk to [laughter] your CEO.
[48:40]
that is coming from the grant funding
that the village received a couple of
[48:43]
years ago that we have to allocate and
uh expend in the a fiveyear window
[48:48]
» that was a growing um communities fund
the 966 some thousand that we got
[48:54]
» that is correct
>> four years ago thank you sir so all this
[48:57]
all this stuff that you're talking about
here is going to be paid by grant money
[49:02]
» uh
>> and uh not these folks here we're not
[49:04]
going to be taxing them and they're
going on their tax bill to rehabilitate
[49:07]
Nkush work
>> well well up till the value of the grant
[49:10]
money that is held in question. Um there
are certainly more options available to
[49:15]
council to elect from that might be over
that value but certainly a lot of the
[49:19]
amenities are within the grant.
>> Just wanted to emphasize that um we're
[49:23]
not taxing our citizens in order to do
this upgrade to Nimish Park that this is
[49:27]
being done through grant money that's
been procured for the provincial
[49:29]
government. And I think these folks in
this room when they look at their tax
[49:33]
bills are really happy when they don't
see them themselves having to be taxed
[49:37]
another million dollars to upgrade their
um their main park in their community.
[49:42]
So anyways, I just wanted to make that
point. I know where the money came from.
[49:47]
[laughter]
Um any other discussions on receipt?
[49:51]
Seeing none, call for the question and
receipt. All in favor? And next is that
[49:56]
council direct staff to proceed
immediately. like that word immediately
[50:00]
with playground equipment renewal using
the growing community spun cost not to
[50:04]
exceed 150,000 and that council direct
staff to include the report for upcoming
[50:08]
budget discussion and secured a movement
councelor Fawson second by councelor
[50:13]
discussion care to lead us off I thought
you would lead us off on that one
[50:17]
councelor Fost starting blocks
>> thank you for the through the chair um
[50:22]
yeah I can't wait to see our tetanas
parks changed into uh parks that are
[50:25]
actually going to be safe for our
children um I've only been here 23
[50:29]
years. Um my son and my wife and I,
we've enjoyed the parks with him while
[50:34]
he was growing up and we're a little
concerned when we saw how unfortunately
[50:39]
well I'm really thankful the parks were
there. I I think with Helicopter Park, I
[50:43]
think in Nipius Park, I already really
appreciate what the uh school school
[50:48]
division had done with their school
parks. Um, and I think the school park
[50:52]
uh, elementary park um, playground is
actually a great example of what or
[50:56]
should give inspire us for the village
what we should do for our parks. So, I
[51:00]
just wanted to uh, say thank you. It's
it's about time that we deal with this
[51:04]
and I'm glad we have the opportunity to
look forward to dealing with it. Thank
[51:08]
you.
>> Thank you, Counc. Any other counselors
[51:11]
want us? Councelor Bickert.
>> Thank you to the chair and thanks
[51:16]
Councelor Fawson. I agree with you. It's
time to look around and it's been
[51:20]
identified as a priority by a lot of a
majority of residents to look at the
[51:24]
tetanus parks and good term. [laughter]
I live beside the helicopter park done
[51:29]
multiple emergency trips of other kids
on the rusty metal there. But yeah, we
[51:34]
have to start bit by bit and this one's
all grant funded and um from community
[51:38]
engagement has shown that it's a
priority. it's in the middle of town and
[51:43]
will be kind of part of whatever we do
with the rest of the funding so that we
[51:47]
can have kind of one defined space
that's not going to affect whatever plan
[51:51]
whatever option design option that we do
and get started on it while we have the
[51:54]
grant funding and a deadline to use it I
think is fantastic and I I really
[51:59]
recommend I don't know who's going to
kind of look at design if it's going to
[52:02]
be staff or if we'll have a chance to
review it but there's some really
[52:06]
gorgeous um just kind of thinking
outside the box inclusive kind
[52:11]
educational parks that include kind of
maybe we can include some gold river
[52:15]
kind of history like Luna or salmon or
wildlife or MFN culture and art and
[52:20]
Naimo where we had some conferences
before I have a gorgeous really really
[52:25]
um it's just inspiring and really
beautiful for the kids and kind of
[52:28]
incorporates lots of um traditional
images and animals and stuff and also
[52:33]
all along the Wfuca Trail down have some
really neat kind of interactive parks
[52:38]
for the kids too so I think it'd be
really special to include some um some
[52:43]
local kind of culture or some local uh
First Nation culture and have it a bit
[52:48]
artistic too as well as safe and um
upgraded. So, thanks staff for bringing
[52:54]
this forward.
>> Thank you, Council Pickard. Anyone else?
[52:59]
» That's where I'm
Yes. It's a long awaited report.
[53:06]
I've had a few people on my case uh
having been at the uh open house in
[53:12]
February, I think it was. So, I'm very
glad to see this in front of us today.
[53:16]
Um I fully support um getting the
playground equipment in as soon as
[53:23]
possible, as soon as we unleash the
funds. And um
[53:30]
I think we perhaps might want to go
slightly further. Um I'm looking at one
[53:36]
of the alternates. Um [snorts]
talking to the uh community garden um so
[53:43]
that they have their preferential area.
And also, I'm thinking about I mean,
[53:50]
because this has been so long, I want us
to be hitting the ground running in
[53:55]
spring 2027.
Um, so I have another subsequent motion.
[54:01]
I won't totally speak to it now, but
more or less getting
[54:07]
as much of that done um in the meantime
so that we are hitting the ground
[54:11]
running.
>> Thank you, councilor.
[54:15]
Director of Operations, Docy, I see in
your report that you're recommending
[54:18]
that um we select one
[snorts]
[54:24]
component of the proposals and that's
the upgrade of playground equipment for
[54:29]
150,000. And I presume that the reason
that you've
[54:34]
presented this to council in that manner
is you're looking at resources and um
[54:38]
climate and time and how much
construction period you have and that
[54:41]
you feel that this would be the only
thing that you could accomplish um
[54:44]
during this um this year. Is am I am I
on the right track there, sir? Is that
[54:49]
the rationale for recommending this
council that we just do the $150,000,
[54:54]
upgrade the playground equipment um and
then defer the other stuff to the budget
[54:58]
discussion and then look at um doing
that in next year? Is that is that the
[55:03]
rationale behind the way that this is
being presented to council? Uh pretty
[55:06]
much uh just keeping in mind um you know
the the next larger uh project will you
[55:13]
know like budget time will be you know
post elections and so there would be
[55:17]
time for the fresh fresh council to kind
of evaluate and and uh understand and
[55:23]
own uh their priorities of the day. Um
and so yeah the playground equipment is
[55:27]
aged. It is um it is not meeting like
current what would be Canadian standards
[55:32]
acceptable for a playground. [laughter]
Um the um I guess the the one notion
[55:39]
that is listed there in the alternatives
would be that if council like maybe not
[55:43]
necessarily selecting a priority next
project, but if they um if they were in
[55:48]
a position where they were comfortable
to select um an option one, two, or
[55:51]
three in terms of where the community
garden goes, that would be beneficial to
[55:54]
get them moving sooner than later. Um
and that would be the only, you know,
[55:59]
that that's listed as an alternative uh
motion. Um
[56:03]
um but that could also be kind of
deferred and uh you know discussed in in
[56:08]
line with budget discussions as well. So
[sighs]
[56:12]
um if this $150,000 was approved for the
replacement of the existing playground
[56:18]
equipment um is that realistic and you
can do you believe that you can
[56:22]
accomplish that before but uh before the
end of this budget year and would that
[56:27]
be contracted out to somebody else or
would that be an in-house project? Uh if
[56:31]
I may through your worship, the the most
likely um what I was would have been
[56:35]
kind of planning on for that would have
been to go through a proposal and kind
[56:38]
of leverage um some of the playground
manufacturers and installers
[56:42]
um against each other to get the best
pricing. Mhm.
[56:45]
» Um, so there would be there probably
wouldn't uh it's it's uncertain as to
[56:51]
whether or not the the whole thing could
be 100% completed before December 31st,
[56:55]
but we would need the funding and the
certainty to to be able to move forward
[57:00]
um to be able to uh run a successful
competition, award a successful
[57:04]
competition, get them going. And then
what what would happen is anything
[57:07]
that's not finished or incomplete at the
end of the year, we would um I believe
[57:12]
here we don't do carry forwards, but we
would roll it forward and budget for it
[57:15]
in the following year. Anything that's
not complete,
[57:19]
that sounds like a maybe.
[57:24]
And that I keep on saying, you're going
to make a great politician one day, sir.
[57:30]
Okay. Um council, any other discussion?
>> Thank you. to the chair. And um just one
[57:37]
more thing to throw out there without
really having to decide on a design
[57:40]
option, but since we've kind of parcled
off the playground as an attainable goal
[57:44]
is it won't really impact whatever
design we go with, would we be able to
[57:48]
maybe throw in um the pickled tennis
ball courts into that too or is that not
[57:53]
doesn't really make sense now because of
weather? But I know there's been quite a
[57:56]
few groups that have approached us that
are doing some makeshift stuff with the
[58:00]
nets and repairing them themselves and
doing the lines themselves. So, I know
[58:04]
that's kind of a defined area that won't
be impacted by what whatever design
[58:08]
option um that we choose out of those.
So, I'm just wondering if that would
[58:12]
make sense to do also implement now and
get it done with the park or just wait.
[58:17]
» That would really be
>> Sorry. Yeah. To your worship, that would
[58:22]
100% be uh council initiative. Um it it
um
[58:28]
it could be a constraining in terms of
like staff time um being able to set up
[58:33]
and uh run multiple uh competitions at
the same time while we have the metering
[58:39]
project ongoing and uh but yeah um I
mean if we're directed to move forward
[58:46]
we will move forward with it.
>> Any followup? Councelor Brickard are you
[58:50]
good? Any other questions for director
of operations Doxy?
[58:56]
Call for the question. All in favor?
Done. Carried. You have your $150,000
[59:01]
there, sir.
And do we have any follow-up motions?
[59:08]
I thought we might. Councelor Rymer.
Uh, I have two follow-up motions. I'll
[59:13]
start with one. um that council direct
staff to proceed by coordinating with
[59:18]
the community garden association on
relocation of the community garden based
[59:22]
on the preferred option plan.
[59:27]
» Do you have a seconder? Councelor Fawson
discussion.
[59:36]
» Um again this is uh very much uh
trying to get ourselves ahead in the
[59:42]
game. Um it's not going to take too much
time to have that conversation and uh
[59:48]
shows that we're reaching out to um a
very important organization uh whose you
[59:54]
know main goal right now is probably to
find a home for 2027. So the more
[1:00:00]
prepared we are for the 2027 growing
season which will be spring um the
[1:00:05]
better it is for them.
>> Thank you. Director of Director of
[1:00:10]
Operations Joy. Do you see any um any
issues with that
[1:00:16]
motion that we're debating?
No, there um there is some flexibility
[1:00:23]
um I I guess with regards to the
community garden location where um
[1:00:29]
it could pro like if if council were to
say uh settle on option one, two or
[1:00:33]
three um and something were to change in
the imple in in implementation
[1:00:38]
implementation
process, sorry. Um
[1:00:43]
there um it looks like um there would be
flexibility that um it could be wherever
[1:00:50]
it is chosen to go there would be room
to move with whatever the remaining
[1:00:54]
aspects of those option plans could
still go. Um you'll see that they're
[1:00:58]
largely kind of around like number 60
the main uh just kind of a field in one
[1:01:04]
of the option plans. that main field
becomes a uh looks like a what's it
[1:01:10]
soccer pitch
if I I'm confusing myself. Um
[1:01:16]
yeah, it's it's yeah, there is room
there um to accommodate that community
[1:01:23]
garden. It's basically if they'd like it
over towards the north or more over
[1:01:27]
towards the south
um there there is room to play. There's
[1:01:32]
flexibility. Council Raymire, do you
have any follow-up questions, sir? Are
[1:01:35]
you good?
>> Okay. Anyone else? Councelor Fawson,
[1:01:39]
» thank you through the chair. And I'm
glad Council Ray, you brought that up.
[1:01:42]
And u the this the one question I have
when when looking at all these different
[1:01:48]
options.
>> Yes, sir.
[1:01:49]
» Is again, I have a small garden. I look
for sunshine.
[1:01:54]
» I look for shade. And so when I was
looking through these different options,
[1:01:58]
I was like, neither of the proposals in
my mind are a great location for the
[1:02:04]
community garden. But I did want to ask
director Doxy because this was done by
[1:02:09]
um a consulting group, engineering
group. Um
[1:02:14]
what is their recommend? So I'm assuming
from all option one, two, and three that
[1:02:18]
these are where they propose the best
place for the community garden would be.
[1:02:22]
And um like you said, I'm pretty sure
which whenever council decides we can
[1:02:27]
consult with the community garden group
cuz I'm pretty sure they're maybe a
[1:02:30]
little more knowledgeable than me about
the amount of sun that the gardens need.
[1:02:34]
Um so there flexibility is there
flexibility with these one, two, and
[1:02:38]
three options and if so um
>> I'm understanding that it's easily
[1:02:45]
changed.
if I may through your worship. Um w
[1:02:50]
within reason. Um you know um I was
looking for the all-in-one uh package.
[1:02:55]
That's the one that has like a soccer
pitch uh instead of just a a simple main
[1:02:59]
field. Um if you look at where the
community garden goes there, it is not
[1:03:04]
terribly dissimilar than where it goes
in uh the music in the park option.
[1:03:08]
Well, that one is different um sorry
than the green thumb option plan. Uh the
[1:03:13]
green thumb option plan has it going up
nestled up near the corner with the uh
[1:03:16]
the spray park and the playground. Um
versus the all-in plan has it kind of uh
[1:03:22]
located in the middle of the west side
of the park. Um so if we put it in that
[1:03:28]
uh all-in plan, it would really just be
a matter of juxtapositioning the
[1:03:33]
gathering space or the gazebo. Um,
you know, um, and similarly, um,
[1:03:41]
you know, if you put it like putting it
in location on the all-in-one plan, it
[1:03:45]
probably makes the most flexible sense
in that if you do or don't go with a
[1:03:50]
gathering space, at least the gathering
space is reserved to be near the
[1:03:53]
playground and the spray park for
parental monitoring uh, sake.
[1:04:00]
um the uh you know putting it over
towards the north
[1:04:05]
um in the music in the park option plan
um and then the green thumb option plan
[1:04:12]
those are also similarly compatible. So
it really comes down to if we really
[1:04:16]
like the all-in plan versus the uh the
green thumb plan I guess.
[1:04:23]
Um,
>> yeah, it's uh
[1:04:28]
» I've seen counselor Pringle's brain
starting to explode.
[1:04:31]
» But it's simply Yeah. The green thumb um
like the primary green thumb and the uh
[1:04:37]
and the all-in option plan had the
community garden in a similar space and
[1:04:41]
the music in the park and the alternate
green thumb have it at the north end of
[1:04:46]
the park. So there's two very, you know,
crude basic depictive areas uh for the
[1:04:52]
community garden. And if we can select
one of those two places, we can move
[1:04:56]
forward with the rest in the time. Um,
you know,
[1:04:59]
» thank you, sir. Um,
>> I just can I just want to just check on
[1:05:05]
something here again,
could you um read back our motion for
[1:05:10]
us, sir? I want to know what we're I
just want to refresh myself on what
[1:05:13]
we're actually
>> to proceed with the community garden
[1:05:17]
» uh based on the preferred plan.
>> Excuse me.
[1:05:22]
» To proceed with the community garden
based on the preferred plan.
[1:05:27]
» Okay. Thank you, sir.
Councelor F.
[1:05:30]
» Thanks. Just a follow-up question
through the chair to the director of
[1:05:34]
operations. Um when this when these
plans were drawn up and the the pe the
[1:05:39]
men and ladies came out to survey the
whole nkish park um I'm assuming they
[1:05:45]
came in the summer or the spring and not
when the uh one section I'm going to say
[1:05:52]
the section closest to uh Eagle Crescent
is not flooded. And so I'm I'm thinking
[1:05:59]
that needs to be taken into
consideration with whatever we put in
[1:06:03]
there, whether it's community garden,
dog park, uh you know, the the um
[1:06:08]
community uh you know, like anything we
put in that side of the park or that
[1:06:14]
side of the track. I'm pretty sure
hopefully they were informed that that
[1:06:17]
area floods quite a bit.
uh they they were they heard it from
[1:06:22]
staff, they heard it from the community,
and they were out for the comm the uh
[1:06:26]
the open house, I believe, was March
5th.
[1:06:29]
» Um and so the survey work would have
happened uh prior like during during the
[1:06:34]
winter period. So um I can't remember
specifically if there was snow or rain
[1:06:38]
at the time. There wasn't a heck of a
lot of snow all winter here, but uh um
[1:06:44]
it I don't think it quite flooded. This
was probably not the most representative
[1:06:48]
year for flooding there, but yeah.
[1:06:54]
Terrific. Any other discussion?
[1:07:01]
You look like you're kind of in the
wilderness there. Councilor Pringle kind
[1:07:05]
of feel the same way. Health for the
question. All in favor? Carried.
[1:07:14]
Council Mer,
>> I'd like to make a subsequent motion
[1:07:20]
that council direct staff to advance the
technical design, costing, and
[1:07:24]
procurement preparation required for
rehabilitation of Nimish Park pathway
[1:07:29]
and resurfacing of the tennis courts and
bring implementation ready options back
[1:07:34]
to council for consideration ahead of
the 2027 construction season.
[1:07:39]
» Do you have all that, um, C Roy, or do
you have a copy of that motion? I would
[1:07:43]
be getting one from council way.
>> I sure hope so.
[1:07:48]
Anyone care to second that motion?
Councelor Fawson. Discussion.
[1:07:55]
» Councelor Wayare.
>> Uh, so as I previously said, I want us I
[1:08:00]
mean, this has been a long time coming.
I want us to be able to hit the ground
[1:08:02]
running in spring of 2027. Um, as we all
know, Canada has two seasons. We have uh
[1:08:10]
winter and construction season and we
are uh heading into winter. So it's not
[1:08:16]
quite realistic to expect resurfacing of
the pickle ball or tennis or basketball
[1:08:22]
courts uh right now. But um what we do
have in front of us is multiple plans
[1:08:28]
that all have a common entity of having
dire need of resurfacing of the tennis
[1:08:34]
courts and the Nish Park pathway being
in need of a lot of love. Um, so that is
[1:08:41]
very much uh the root of this motion uh
that staff has the winter to uh get the
[1:08:51]
ball rolling and then hopefully come
spring of 2027 we can hit the ground
[1:08:56]
running instead of uh possibly missing
another window.
[1:09:01]
» Thank you, Counc.
[1:09:05]
» Yeah, thank you councelor Weimar. And um
I I love this motion and I think it's
[1:09:10]
great. We've been waiting a long time
for the macain report. I know staff's
[1:09:13]
going to be really busy putting the ice
in and then the pool and the boiler and
[1:09:16]
all that, but and then Christmas and all
that, but during that time, I think it
[1:09:21]
would be great to be ready and prepared
and have have as much ready as we can. I
[1:09:25]
know that the park was a big concern
with residents, but also that walking
[1:09:29]
path around and how unsafe it is and how
two people can't go side by side and
[1:09:33]
it's not great for mobility and needs a
bit more accessibility. having that for
[1:09:37]
residents to look forward to in the
spring to get them through the dark days
[1:09:40]
of winter. And also that pickle ball, I
know I haven't played it yet, but I used
[1:09:45]
to play tennis with the old deli guy
against that wall and I love that that's
[1:09:50]
gone. But I think just having that
knowing
[1:09:53]
» deli guy [laughter]
the deli.
[1:09:57]
» Okay,
>> I used that wall till it fell over and
[1:10:01]
Mr. Kim Mr.
>> [laughter]
[1:10:04]
» Anyway, I think having that, yeah,
knowing that that's coming and knowing
[1:10:08]
that all the consultation was listened
to and we're working on it and it's
[1:10:12]
going to be um have a facelift will be a
great um boost for residents over the
[1:10:17]
winter. And just as a side note too, I I
like the option. There were some
[1:10:21]
recommendations to have that, you know,
Molini drew up these different
[1:10:24]
proposals, but the design options, but
the gazebo and kind of sitting viewing
[1:10:28]
area by the parks, a great option for
parents who want to monitor their kids
[1:10:33]
and who have to listen to all the
shrieks and laughs, but also maybe a
[1:10:37]
second gazebo option for people who are
um don't really have kids or don't want
[1:10:42]
to listen to all the shrieks and laughs.
some of the um elderly people or people
[1:10:48]
who've moved on from the parent phases
to maybe even considering two different
[1:10:51]
options to kind of accommodate both
those um listening pleasures for
[1:10:57]
residents would be nice to consider.
Thank you.
[1:10:59]
» Thank you, Council Pickard. Any other
discussion on the motion? Seeing none,
[1:11:03]
call for the question. All in favor?
Terrific.
[1:11:08]
Okay. Are we done with that one, folks?
I think [laughter] so.
[1:11:13]
All good.
8.6
[1:11:18]
Anfidic Aquatic and Sports Center and
Jerry Morgan Memorial Center reopening
[1:11:22]
plan
that the Anfidic Aquatic and Sports
[1:11:26]
Center and Jerry Morgan Memorial Center
reopening plan report be accepted for
[1:11:30]
information who care to move it.
Council Pringle second by councelor Pit.
[1:11:36]
Discussion
[1:11:43]
[laughter]
the chair. Good luck getting the boiler
[1:11:47]
in it.
>> One day I'm going to get one of these
[1:11:49]
closed before you get your hand up.
Councelor Pickard.
[1:11:53]
» I already did. It was really quick
through the chair. Good luck getting the
[1:11:57]
boiler installed. I don't know if I'm
going to be able to accomplish that.
[1:12:00]
» Looking forward to it.
[1:12:04]
» Are you done?
[1:12:08]
» Any other discussions? No. Call for the
question. All in favor? carried
[1:12:12]
unanimously. 8.7 recreation service rate
review that the move that the recreation
[1:12:18]
services rate review report be accepted
for information. Who care to move it?
[1:12:22]
Councelor Faucet, second by councelor
Pringle. Any discussion?
[1:12:29]
Director of operations Doxy. I see
you're recommending that um we do an
[1:12:33]
inflationary increase for our fees and
charges at um the aquatic center and
[1:12:37]
pool and you're recommending zero
increase at the um campground. Can you
[1:12:41]
tell me why that we have a you're you're
recommending that um
[1:12:46]
this that option of having zero at the
campground instead of 3% of the
[1:12:50]
compound. What's your rationale behind
that sir? Um
[1:12:55]
well the willingness to pay I suppose uh
the campground has just historically um
[1:13:02]
it hasn't hasn't seen uh the the assets
or the quite the infrastructure. There's
[1:13:06]
no water service. There's um there's
it's it's basically staff time um which
[1:13:12]
does go up every year, but there aren't
a lot of uh secondary um technical
[1:13:17]
amenities down there um that drive cost
quite as much as there are with the
[1:13:21]
facilities like the pools, the arenas,
and such. Um
[1:13:26]
so that's kind of the basic crux.
Otherwise, the recommendations towards
[1:13:29]
3% or um I'm going to say they're kind
of balanced. We heard the report from
[1:13:33]
the health medical health officer tying
in uh kind of the need for recreation uh
[1:13:38]
services in a community and and tying it
into the [clears throat] need or the the
[1:13:43]
benefits of access in terms of like
physical health, mental health, and
[1:13:47]
addictions and uh and heading those
things off. So, it's a bit of a
[1:13:50]
conflicted report where I'm recommending
a 3% to keep us up with inflation, but
[1:13:54]
also reminding council that some of
these things are um um they are
[1:13:59]
community services um intended to
benefit the whole community and um and
[1:14:04]
with that respecting council's um
direction as to what the increase should
[1:14:08]
be, but we were recommending 3%.
director of operations oxy and
[1:14:12]
historically over the last few years
you've been recommending the same amount
[1:14:16]
and council's been proving that Croy
historically last few years has been 3%.
[1:14:22]
» I believe it has been 3%.
>> Yeah, that's my recollection also. I
[1:14:26]
could be incorrect but I'll go back and
take a look at the YouTube for the last
[1:14:29]
couple years and see what we actually
recommended because I've got a boring
[1:14:32]
life [laughter]
but I'm pretty confident it's 3%.
[1:14:37]
And I do agree with you. Um I don't know
if my colleagues do, but I'm quite
[1:14:41]
prepared to support um inflationary
increases and those facilities. That
[1:14:45]
basically in my mind that's no increase
if we're just doing inflationary
[1:14:48]
increases. And that's kind of a best of
both worlds. And at the same time, I
[1:14:53]
don't believe we should be increasing
the costs of our um fees at the
[1:14:58]
campground. I think they're excessive at
this point based on the amenities that
[1:15:01]
are available down there. And you know,
I wouldn't support any increase in the
[1:15:04]
the costs. I know that um you still got
some improvements that you're going to
[1:15:07]
be doing down there, which is
encouraging. It's nice to see that I can
[1:15:10]
finally find the campsites now because
they're all numbered and we have nice
[1:15:14]
new information signs down there. And
you're planning on replacing those
[1:15:17]
dreadful toilets that we have down there
that are the most that are disgusting, I
[1:15:22]
think. And that's compliment. I could
probably get into other words, but I get
[1:15:25]
in trouble for using exploitives, so I
won't go there. But I know that you're
[1:15:29]
replacing those, so I'm very happy about
that and maybe some work on the signage
[1:15:32]
and other thing. But one thing I got
from the people that were down there
[1:15:35]
this summer, director of operation, Dr.
seem very happy with the fact that um
[1:15:40]
you've uh you're keeping all of the um
campgrounds down there very clean. Your
[1:15:45]
staff is doing a great job keeping it
very clean down there. Seem to be very
[1:15:48]
happy with that. And the other thing is
that you've done some work on those
[1:15:51]
disgusting toilets by putting in new
toilet dispensers and sand sanitizer and
[1:15:56]
using a biodegradable thing to reduce
the smell and everything. So, I know
[1:15:59]
you've been making efforts, but you
know, sometimes you can only put so much
[1:16:03]
makeup on. The pig is still a pig,
right? So, I'm sure glad that you've got
[1:16:08]
your $8,000 I think council gave you to
replace those um those um those
[1:16:13]
buildings down there. The what do you
call those those rooms? Those toilet
[1:16:17]
rooms down there.
>> John's John's.
[1:16:20]
» Whatever you worship, they're they're
pit toilets. The super structure.
[1:16:25]
» Yeah. I've never found a pit toilet I
like. It doesn't matter how nice it is,
[1:16:28]
but I never but anyways I do appreciate
all the efforts that you guys made down
[1:16:31]
there. But getting back to the question
here is that receiving for information
[1:16:35]
I'm happy with your proposals and your
recommendations. Um any other
[1:16:39]
discussion?
All for the question on favor receipt
[1:16:42]
done. And then I see you kind of gave us
some detail in the next one here that
[1:16:46]
council adjust the rates at the an
Aquatic Center as shown in column C that
[1:16:50]
I assume is a 3% one. That's what I
referenced. Yeah. And that council
[1:16:54]
adjusts the rate at the jury. Morgan
Moral Center as shown in column C and
[1:16:59]
that council retain the rate at the
campground set during the April 20th
[1:17:02]
2026 council meeting as shown on column
A. Who care to move that? Councelor
[1:17:07]
Picker second by councelor Foster. Any
more discussion that we had? Councelor
[1:17:11]
Pickard.
>> The chair and um I think that the
[1:17:15]
inflationary 3% is really fair. Just
keeps us in line with what we're
[1:17:18]
increasing for wages and costs and
utilities and upgrades. And I think it's
[1:17:23]
still really important to note even
though we do the 3% increase, infants
[1:17:28]
and preschool kids six and under still
stay free which is awesome I think for
[1:17:32]
little kids and increases accessibility
and safety and learning how to swim. So
[1:17:36]
I appreciate you guys keeping that free
for kids under six. And also still our
[1:17:41]
rates you know the 3% a child goes from
405 to 425 quite nominal and still
[1:17:47]
really affordable and adults and seniors
too is quite nominal. So I agree and
[1:17:52]
support it and still believe our rates
are really fair for the quality of our
[1:17:56]
facilities. So thank you.
>> Thank you councelor Pickard. Any other
[1:18:00]
comments? People happy. Good to go. Call
for a question. All favor
[1:18:07]
reports from councelor
counselors councelor fost officer.
[1:18:13]
» None at this time. Your worship
councelor Fson councelor Pickard.
[1:18:18]
Thank you through the chair and um just
a couple updates for the last month I
[1:18:24]
guess since we've met last and first of
all just want to say thanks to all the
[1:18:29]
organizers and the groups and
individuals that made Goldiver days such
[1:18:33]
a success and important event for the
community. It's always a highlight for
[1:18:37]
our community and visitors in the
summer. So thanks to everyone involved
[1:18:40]
in organizing and also thanks to the
Chamber of Commerce for taking it on
[1:18:44]
this year. That's that was really great.
And also thanks to Connie and her crew
[1:18:49]
from the slow pitch um Gold River Slow
Pitch and they did a lot of work to
[1:18:53]
organize lots of crew and team and
visitors to come in and it was great to
[1:18:57]
see so many people some great ball and
tons of people spending hopefully lots
[1:19:02]
of money in Gold River and supporting
all our businesses and just making our
[1:19:05]
community more vibrant.
And also just wanted to send consol
[1:19:10]
condolences that that event
unfortunately ended um in a tragedy and
[1:19:15]
we lost a really important member of our
community and send prayers and strengths
[1:19:20]
to the Christensen and Johnson family
and the entire MFN community and Gold
[1:19:24]
River community as Shane was a gentle
and kind soul with a big heart and
[1:19:29]
brought our communities together more
than anyone I think I know in the
[1:19:33]
community and um brought people together
and he was really committed to salmon.
[1:19:37]
So he I don't know if anybody knows but
he right now the hatchery is out in all
[1:19:41]
the rivers and getting all the salmon in
there so thanks to the Kuma hatchery and
[1:19:46]
all their staff but he was a big part of
that team for over a decade. So he made
[1:19:49]
a really big impact on salmon in the
community and um fed the salmon all
[1:19:54]
throughout the year before their river
releases. So, um, yeah, well, he'll be
[1:19:58]
deeply missed by a lot of us, but I hope
his legacy lives on through us and
[1:20:03]
through, um, his love for salmon and the
impact he had. And so, um, yeah, and
[1:20:10]
thanks to everyone who showed support to
the family community and celebrating his
[1:20:13]
life. And, um, on that note, brood
collections going on. Mayor Lot's been a
[1:20:18]
volunteer for that before, but the
Canuma hatchery and all their staff head
[1:20:22]
out to the rivers and they actually
support six rivers and they collect
[1:20:25]
they're collecting brood now in the
Burman and Gold Rivers. And that's super
[1:20:29]
important for our area. They get the
fish, do the pairs, match them even for
[1:20:33]
the Burman River, um get the most
genetic Burman DNA fish and make the
[1:20:39]
pairs and then do all their brood stuff
magic out there and raise the fish all
[1:20:44]
winter and then release them in the
river. So that really supports our
[1:20:47]
fishing industries and our sport fishing
and wreck fishing and family fishing. So
[1:20:51]
they're doing really important um work
out in the rivers right now. So thanks
[1:20:56]
to their team. That's that's really big
for our fisheries around here. And um uh
[1:21:02]
another note in some restoration work. I
don't know if anybody went out to
[1:21:06]
Mushlet Lake at the end of August, but
our council's been really supportive of
[1:21:11]
a big restoration project that's
restored some really important quality
[1:21:15]
salmon spawning habitat at the outlet of
Mushellet Lake. So, that was a 1.4
[1:21:20]
million all grant-f funded project that
restored habitat, employed local MFN
[1:21:26]
members, um had some contractors come
out from Trinity Consultants and Far
[1:21:31]
North contractors. So kind of a big
economic boost for the region too. And
[1:21:35]
that project was completed ahead of
schedule, unheard of almost in
[1:21:40]
construction and on time. And so that is
done and you guys will see some media
[1:21:45]
and some footage there. But a really
also important collaborative project for
[1:21:49]
partnerships and for ecosystem health,
for wed waterershed function, and for
[1:21:54]
salmon health. So hopefully we'll see
lots of benefits. We'll see in a couple
[1:21:58]
weeks salmon all coming up the rivers.
really incredible part of where we live
[1:22:02]
and hopefully again using all that
habitat and that wershed restored and
[1:22:07]
giving nature a chance to heal herself
out there.
[1:22:10]
And uh two billion tree planting project
that's funded by natural resource Canada
[1:22:15]
is also starting up in the upper Musl
rivers. So that's kind of the last year
[1:22:20]
of that project. Restored some upper
octaw last year now upper mushullet and
[1:22:24]
all just helping planting repairarian
areas. That's um Nucasan Wershed
[1:22:29]
Society, uh Salmon Park Stewardship
Society, and MFN Partnerships also. So,
[1:22:34]
some really great work happening
um in that restoration area. And then
[1:22:40]
Mayor Lot and I had um an update from
kind of on the other end of the fishery
[1:22:45]
stuff aquaculture. We're going to have a
big update tomorrow. So, we'll share it
[1:22:49]
with Marian Council from Jennifer
Woodland, our contact with Surerach, and
[1:22:53]
they
um she just got back from a trip, but
[1:22:57]
there was a some update. She's actually
joined the board for resource works,
[1:23:02]
which do lots of advocacy for our uh
resources and have been a big big
[1:23:07]
partner with us to advocate for
aquaculture and our other industries.
[1:23:11]
And we are still awaiting any updates or
news from the federal government on the
[1:23:16]
aquaculture um proposed ban, but there
was a really important bi-election at
[1:23:21]
the end of August and um they that kind
of went in the favor of the aquaculture
[1:23:27]
support. So we should as we've been
saying for a long time, we thought early
[1:23:31]
fall right now have an update on that
and we'll kind of know a little bit more
[1:23:35]
for our um our residents and all our
partners at SURAC. So that's all for in
[1:23:43]
Thank you,
>> Counc.
[1:23:47]
» Yeah. Um I got to uh meet with the new
head of operations down at Western
[1:23:52]
Forest Products. Um I don't even know
his last name, Derek. [laughter]
[1:23:56]
I uh what four weeks in now. Um so I'm
trying to uh give him a little bit of
[1:24:03]
grace as he gets his feet under him. Um
he tells me that um they're you know as
[1:24:10]
said before the plan was to go into the
Saunders and go out to the east coast
[1:24:13]
and they're kind of ramping up to start
doing that this uh fall. So apparently
[1:24:18]
there's lots of wood there. Um it's
multi-year so that is very promising.
[1:24:24]
And ideally, um, I was going to check up
with him, uh, get as, you know,
[1:24:29]
up-to-date facts as possible, uh, before
heading off to UBCM, uh, which
[1:24:34]
apparently I have three days to go and
see him again. Uh, that's everything for
[1:24:40]
me.
>> Thank you, Council Wear. Did I miss you,
[1:24:44]
Council Pringle? I know I'm bad
sometimes with that. I councelor
[1:24:48]
Pringle,
>> I think at this time. Thank you.
[1:24:51]
[snorts]
[1:24:58]
Um, I don't know if you folks pay
attention to things like this, but um,
[1:25:02]
that's important. Um, just recently our
prime minister, Mark Carney, um,
[1:25:07]
appointed a new deputy minister of
fisheries and oceans, gentleman's name
[1:25:13]
is Paul McKinnon. And um Paul McKinnon
was invited out to Vancouver Island by
[1:25:20]
the Coalition of First Nations for
Finnfish Stewardship. And that group um
[1:25:25]
invited um stakeholders in the
aquaculture industry um as well as
[1:25:31]
politicians um like myself, communities
that have significant investments in the
[1:25:36]
in the aquaculture business um to meet
with him. So we met with them in
[1:25:41]
Campbell River and it was usually these
things are kind of lame. You know, you
[1:25:45]
don't get too much attention. They're
just photo ops. But um this one wasn't
[1:25:49]
this was a person who had a genuine
interest in uh understanding the
[1:25:54]
aquaculture business on the West Coast
because there's a significant question
[1:25:58]
before this government that they have
yet to answer and that's whether or not
[1:26:03]
they're going to resend the um ban on um
open net salmon farming. So I was quite
[1:26:11]
surprised that he gave me a a lot of
time to talk to him about the
[1:26:17]
aquaculture business on the banker
around the west coast. And he also spent
[1:26:22]
time trying to understand how that
impacted Gold River and what were the
[1:26:27]
implications of us
shutting down um Surerax operations down
[1:26:33]
at West Coast Marine Terminals,
terminating their hatchery and
[1:26:38]
eliminating their open net fish farming.
And we talked about those implications
[1:26:42]
and he was quite open to understanding
what was happening there. He real he
[1:26:46]
wanted to know what were how is it going
to affect the people in your community?
[1:26:50]
how many people from First Nations were
employed in that industry? Um what kind
[1:26:55]
of um economic impacts does it have?
Like what kind of wages are generated
[1:26:59]
and what secondary industries are
supported like um in your community? and
[1:27:04]
he he gave me the time to go over that
and make the case and said that he found
[1:27:08]
he said they found that very
enlightening and it's going to help him
[1:27:11]
with his deliberations when he goes back
to um back to Ottawa and talks to his
[1:27:16]
boss Joan Thompson and Joan's boss Mark
Carney because I guess this decision is
[1:27:21]
sitting on Prime Minister Mark Carney's
desk and he's hasn't made it yet because
[1:27:25]
he's not doesn't look like he wants to
follow what his predecessor did in this
[1:27:29]
industry Pier Trudeau and it was
[snorts] interesting that bi-election
[1:27:32]
that councelor Picker referred to in
North Vancouver Capalino. The fellow
[1:27:36]
that was the MLA there was a was an
ardent um was was ardently opposed to
[1:27:43]
the industry and uh was actively
involved in um you know drawing up the
[1:27:48]
legislation for shutting and terminating
it. The new fellow that um got elected
[1:27:52]
happens to be a staffer that used to
work for Mark Carney who has a
[1:27:56]
completely different perspective on
aquaculture and the potential for
[1:28:01]
aquaculture. So, um, thank you, um, to
Paul McKinnon, um, the deputy minister
[1:28:07]
of fisheries and oceans for, you know,
spending the time, um, getting to know
[1:28:12]
me and Gold River and Surerac and the
business because representatives for
[1:28:15]
Surac were there and plus spending time
on the island. He had gone out and seen
[1:28:18]
a lot of fish farms when he was here.
And so thank you for you know that um
[1:28:23]
for for for really
diving deep into it and understand the
[1:28:27]
implications if if uh we don't if we
terminate that business and it has and
[1:28:32]
that business has so much potential for
growth and and has so many good things
[1:28:36]
that it can provide. But I do thank him
and he also said that his office on the
[1:28:40]
west coast interesting enough is um our
DFO building in Gold River. He said next
[1:28:45]
time he's out here at the office he's
going to phone me up and invite me out
[1:28:49]
for a cup of coffee. So I thought, "Wow,
I like that. That'll work for me." So
[1:28:54]
anyways, that's probably one of the most
interesting meetings I've had with the
[1:28:57]
highlevel politician. Most of the time
it's just photo op and you're out the
[1:29:00]
door. They don't really care what you
have to say. It's just But this guy was
[1:29:03]
really he was really interested. He
wants to know and um I think he they
[1:29:08]
went very favorably. He seemed very
supportive of it. He's from PEI and from
[1:29:13]
Prince Edward Island and the Maritimes
they aquaculture is a big thing out
[1:29:17]
there. He said, "I grew up next, you
know, when I grew up, you know, next
[1:29:21]
door to this operation. They it was
responsible was a hatchery and it was
[1:29:24]
responsible for creating all the smolts
for all the open net fish farms that
[1:29:28]
were operated by the province of New
Brunswick and Newf Finland and what was
[1:29:33]
the other no scope?" He said, you know,
I said, "Well, we want our industry to
[1:29:38]
mirror what you guys are doing on the
east coast rather than being shut down."
[1:29:41]
So, he was kind of Yeah. So, I think
that maybe we have a different
[1:29:45]
perspective.
So,
[1:29:47]
That's good. The other thing I was
really grateful for, I don't know if you
[1:29:50]
guys noticed it, but I sure noticed it
by looking around the town and talking
[1:29:54]
to the businesses in town and looking at
our campground with the Uchuck being
[1:29:58]
down. Like I had that terrible accident
and um you know that was
[1:30:04]
down where was it down? They were down
at Barkley. They were down there and
[1:30:08]
they ran ground or something to this the
bottom of the hull and lost their rudder
[1:30:13]
and everything. So, they've been down
for the summer. And boy, talk about the
[1:30:16]
impacts. Like, usually it's the
campground's full, you know, because
[1:30:19]
people are waiting to get on to the
tours that um you checked in, but not
[1:30:23]
this year. Talking to people in town,
the businesses, they usually, you know,
[1:30:27]
talking they're accustomed to having
those customers come in and buy services
[1:30:31]
off of them. Not happening this year.
So, um it was really it was really
[1:30:36]
uplifting for me to be down there. And I
talked to the owners as we went through
[1:30:39]
the summer, kept the updates, and Sean,
the owner, was down in Victoria for the
[1:30:43]
whole time, you know, overseeing the
project. But the Utre is back in town
[1:30:47]
again, and it's really nice to see it in
port and uh back in service again. So,
[1:30:52]
that is really uplifting for me. And I
think uplifting for Gold River and the
[1:30:56]
Nook Sound in our economy. And I didn't
realize, you know, the type of impact
[1:31:00]
that has, but man, does it ever have a
profound impact, you know, when you take
[1:31:03]
that out, it just like seems like the
the heart of our economy, you know, and
[1:31:08]
I know these guys did a great job just
with that. They just had the a was it AJ
[1:31:12]
Greer to work with in the summer and
they they were working 24 hours a day,
[1:31:15]
seven days a week to keep up. They did a
great job keeping the business going,
[1:31:19]
but they couldn't do any tourist
traffic. So, good for them. And I'm
[1:31:23]
talking to Sean, the owner. who said
that um two years uh two years ago,
[1:31:27]
remember we they he they they went down
because they their their motors were
[1:31:31]
they had problem with their motors, but
they've got new motors now and he's
[1:31:34]
going to be bringing it down to dry dock
again in October to have those
[1:31:37]
installed. So, he's going to have brand
new motors on the boat, too, and brand
[1:31:40]
new hull and a brand new rudder. And
hopefully is he has a fair saving for a
[1:31:44]
few more years because he's had some bad
luck over the last couple years and it's
[1:31:48]
been hard on him and hard on our and his
family and his business and our
[1:31:52]
community. But yeah, really appreciate
these guys. I don't know. I I haven't
[1:31:56]
met a heartier souls and these mariners
out there. They just nothing nothing
[1:32:01]
phases them. They and they keep on
going. So, um great work you guys and
[1:32:06]
I'm glad to have you back and your
business back and in service because it
[1:32:10]
sure has a negative impact on the
community.
[1:32:14]
Um I didn't know whether it was
appropriate for me to talk about this or
[1:32:18]
not, but I just wanted to share with the
community that I did. Yeah, I don't
[1:32:22]
care. people say maybe that's not not a
mey thing. I said well I'm the mayor so
[1:32:26]
whatever I do is a mey thing so
suck it up. So anyways, but my my
[1:32:33]
thought very much was this is that I did
attend that celebration of life for
[1:32:37]
Shane Christensen who uh who
unfortunately passed away during the
[1:32:41]
weekend our
weekend where we have our gold river
[1:32:45]
days and it was very tragic and um
I just wanted to extend my condolences
[1:32:52]
like people like um
councelor Pringle did at the celebration
[1:32:57]
of life very profound and moving
testimonies from a lot of people. It was
[1:33:01]
really a great ceremony. You know,
people just came up to Mike and they
[1:33:04]
talked about Shane and um who he was and
you know the impact he had in the
[1:33:10]
community and what an influence he
positive influence was in the community
[1:33:13]
that yeah I didn't feel it was
appropriate for me to spoke to him for
[1:33:16]
some reason. I don't know why but um I
do feel you know I should have and I did
[1:33:20]
want to make this public comment that um
yeah my heart is broken. I think um the
[1:33:28]
heart of our community is broken. I
think we lost a very valuable son of
[1:33:32]
Gold River and Malach First Nations and
um the impacts are felt now and probably
[1:33:37]
reverberate into the future. But I did
want to know that the family to know
[1:33:41]
that um I extend my condolences to them
and all his friends and family and his
[1:33:47]
loved ones. And I was really
appreciative of the folks that put on
[1:33:50]
the celebration of life because they put
on a great um yeah a great ceremony for
[1:33:55]
him. I think I just love the fact that
they had all those testimony
[1:33:58]
testimonials on there. I've never been
to one like that before where person
[1:34:02]
after person after person went to the
mic and um shared their experiences with
[1:34:06]
Shane and I was, you know, I'm not
supposed to cry. I'm a guy and I'm
[1:34:10]
supposed to be a macho guy. But there I
was blubbering and like because my
[1:34:15]
daughter grew up with Shane and I grew
up with Shane and I have a lot of
[1:34:19]
contacts with him. But I'm sure you know
he had contacts with everybody in this
[1:34:22]
town. He was just kind of the great
ambassador ambassador for our community
[1:34:26]
and [snorts] to talk about a unifying
force between Mao Mush First Nations and
[1:34:30]
the citizens of village of Gold River. I
think we both adopt him. He's both our
[1:34:34]
sons, right? So anyways, um Shane, we'll
miss you and um yeah, hope you're having
[1:34:40]
fun up there with all your friends and
relatives playing whatever game you're
[1:34:44]
playing because I know you love sports.
But yeah, so that's I wanted to do that.
[1:34:50]
Um, one of the things that the mayor has
to do is he has to sit as a director on
[1:34:59]
Strathon regional district and basically
represent the whole Stratthon regional
[1:35:04]
district which is large areas basically
mostly central and a lot of North Island
[1:35:08]
and um there was a project that um that
were worked on over the years that I was
[1:35:13]
with uh sitting in this chair and
sitting on the chair and as the SRD and
[1:35:18]
one of them was really proud of the BS
associated with and enjoyed working on
[1:35:21]
and uh has recently come to fruition was
the umh
[1:35:27]
the project that they had. Let's see if
I've got it written down here because I
[1:35:31]
don't want to get the name wrong. These
are recorded and then people SRD give me
[1:35:35]
hell when I go out there. Don't you know
the name of that project? [laughter]
[1:35:39]
It's uh just like home lodge and the the
health professional housing project. And
[1:35:45]
there was a ribbon cutting that we just
did recently. And that just like home
[1:35:49]
project touched me because I'm health
care professional. And I noticed that
[1:35:52]
there's a lot of barriers for people
when they're looking after loved ones.
[1:35:55]
Like if you have a your child is really
sick and you have to take some place and
[1:36:00]
they need care there and you want to be
there to support the child, you got to
[1:36:04]
you know you got your transportation
costs over there. Accommodation.
[1:36:06]
Accommodations are such a barrier to to
families. is too so expensive. And the
[1:36:11]
just like home um allows people that
have loved ones um in the hospital that
[1:36:17]
are being treated um to stay at this
just like home place that's just beside
[1:36:22]
the hospital and it costs us for a
nominal fee. I think it's about $10 a
[1:36:26]
night or something. They can stay there
and be there to support their loved one,
[1:36:29]
right? And um if the loved one can get
to the just like homes, they can go over
[1:36:33]
there, too. So um to me it's a it's a
project that um I enjoyed um being part
[1:36:39]
of and working on and they also we also
talked about it's critical for a health
[1:36:43]
care system to be able to compete to
attract um health care professionals
[1:36:48]
especially specialists um there's so
much demand for them all over the world
[1:36:52]
they can go anywhere they want so we
need to you know try and create some an
[1:36:56]
edge for ourel and part of this project
was um folks that are interested in
[1:37:01]
coming to Campbell river to work in
Campbell River and their health care
[1:37:05]
professionals, they can stay at this um
this um health professional housing at a
[1:37:11]
significantly discounted rate while
they're practicing here if it's just
[1:37:15]
short period of time or long period of
time or if they want to be there as they
[1:37:19]
transition in the community to find
housing. And it gives us a little bit of
[1:37:22]
edge because one of the things that
health care professionals have indicated
[1:37:25]
in all surveys that are done is that if
um there's some sort of u subsidy or um
[1:37:31]
or facilitation for housing that um
affects their choice on where they'll
[1:37:36]
practice. So, it's really great to be a
part of that and um yeah, and it's a
[1:37:41]
project that
[1:37:44]
I like I'm I'm I'm I'm really pleased
with and I think it enhanced the
[1:37:48]
healthcare system out there in our
region and especially in Camel River.
[1:37:52]
And the other one um that and we're
talking about my background is in
[1:37:55]
recreation and aquatics. So, this one
was really passion one of my passions as
[1:37:59]
we went through the years is that um
Strath Kona Gardens um is familiar with
[1:38:04]
that. What we did is we um we tore down
the old aquatic center there and we
[1:38:09]
built a new aquatic center and a
wellness center and that facility is
[1:38:14]
going to be opening in the region and
I've had a chance to tour through it
[1:38:17]
with the um the contractors and it's
going to just be amazing. People will
[1:38:20]
just be blown away when they when they
get in there and they actually um enjoy
[1:38:24]
and experience it. And our ribbon
cutting for the grand opening ceremony
[1:38:29]
is on September the 29th, which I'll be
a part of. And um again, I'm looking
[1:38:33]
forward to being there. And just to give
you some context, that project's about
[1:38:37]
$70 million project, and it was done on
time and on budget. And um the reason I
[1:38:43]
put a number to it and that sort of
thing is because when people talk about
[1:38:48]
shutting down and bulldozing our pool
and recreation center, you're talking
[1:38:51]
about um for those assets down there for
the community, they're hundreds of
[1:38:55]
millions of dollars. Hundreds of
millions of dollars that we have and we
[1:38:58]
that we that we own and um we don't have
any I might be incorrect, but I'm pretty
[1:39:04]
confident we don't have any debt on them
at all. It's all paid off. Is that
[1:39:07]
correct, Cra?
>> That's correct. The village of Gold
[1:39:10]
River is debtree at this time.
>> Debtree. I don't know about you guys,
[1:39:13]
but I don't know too many people are
debtree. Um, a lot of people I talk to
[1:39:16]
have mortgages. They're paying for the
car payments. They've got their lines of
[1:39:20]
credit. They got their charge cards. And
I know a lot of communities that I deal
[1:39:24]
with, um, municipalities in the
province. I deal talked to a lot of
[1:39:28]
politicians. None of them that I've
talked to are debtree. Goldfree is
[1:39:33]
debtree. As far as I'm understand, CEO
Roy, we don't have debt on any of our
[1:39:37]
public facilities. Am I correct there,
sir?
[1:39:40]
» Yes, that's correct. Anybody can review
our financial statements. Well, it'll be
[1:39:45]
indicated in there, too.
>> Yeah, that's pretty amazing. You guys
[1:39:48]
aren't paying interest any interest on
loans.
[1:39:53]
And most of the stuff that we do is done
through grants. I like it.
[1:39:58]
Kind of keep Mr. Roy here. He's keeping
us going and all these creative
[1:40:03]
financial ways to keep us going.
Yeah. Anyways, do I have anything else
[1:40:08]
on my list? Oh, yeah. One more thing. I
I was spending some time with um
[1:40:14]
councelor Way Meer and I and the CEO are
going over to Vancouver to participate
[1:40:18]
in this thing called the University of
British Columbia municipalities. And
[1:40:22]
sometime I wonder about the value of
some of these things that we go on. Um
[1:40:26]
whether or not we get any return as a
community for us going over there and
[1:40:30]
spending time with um these politicians
and administrators. But uh I think there
[1:40:36]
is value. You know, they hear our
concerns about what we're what are what
[1:40:41]
our priorities for Gold River. It helps
us when we want to um apply for grants
[1:40:47]
and um I think that you know it networks
and so we have contacts there. But we're
[1:40:52]
going to be when we go over there,
councelor Waymire and I are going to be
[1:40:55]
running around visiting or actually
having meetings with the Minister of
[1:40:59]
Finance,
Ministry of Forestry, Ministry of
[1:41:03]
Citizen Services, Ministry of Rural
Development,
[1:41:06]
Ministry of Environment and Parks.
And um there's a whole list of each one
[1:41:12]
of those ministries. We've got our
briefing sheets that councelor Waymar
[1:41:16]
worked on and really diligently did a
great job putting together and council
[1:41:20]
and our CEO um cleaned it up a little
bit so it's more presentable so because
[1:41:25]
we have to send that over to them. So,
we're going to be meeting with these
[1:41:28]
ministers um to um discuss u issues that
are critically important to the village
[1:41:33]
of Gold River and um advocating on their
behalf, plus networking and apparently
[1:41:38]
learning and every once in a while we're
allowed to go play for a little bit, but
[1:41:41]
we won't talk about that. So, but most
of it's work, work, work, and taking
[1:41:45]
time off of work or taking holidays to
go over and do it. Yeah. So, that's
[1:41:50]
something I've been getting prepared for
um during this time and uh hopefully
[1:41:55]
next week when we head over like
council, he's got three days to meet
[1:41:58]
with because we'll be hopping on the
hopping on the fairies and heading over
[1:42:02]
to to Vancouver for um a week in order
to meet with these people and talk to
[1:42:09]
them as politicians and bureaucrats
to promote Gold River's um interests and
[1:42:17]
concerns. S. So that's about it for me.
Could go on and on and on, but you folks
[1:42:23]
look like you're getting tired. 8:41
long meeting. Probably want to hear from
[1:42:27]
me anymore.
[1:42:31]
Probably happened about 15 minutes ago,
huh? They're just all very polite.
[1:42:35]
Anyways, that's it for reports from
council. Um, information items, work in
[1:42:40]
progress,
and let's see. We usually have a motion
[1:42:44]
associated with that. Council received
the work in progress for information.
[1:42:48]
Who care to move it? Councelor Waymer,
second by councelor Fost. Any
[1:42:52]
discussion?
[1:42:55]
Council Way, I thought you may want to
talk about revitalization tax exemption.
[1:43:00]
» Yeah. Um, that one's coming up, so I'll
leave that one alone. Um, I guess a
[1:43:06]
question through the chair to
staff in general. Um,
[1:43:12]
we've had that inquiry into MmfN for
months now. Um, have we done any
[1:43:20]
followup and have as have they
responded?
[1:43:25]
» Director of operations, Oxy, I think
you've been fielding this one for the
[1:43:28]
last 6 months.
>> I'm answering your worship. I sent an
[1:43:30]
email back to the uh uh the person on
the language committee um just this last
[1:43:35]
week. I haven't heard back yet, but u I
there's been a few prior uh
[1:43:40]
correspondences through the through the
chain, but this time I went directly to
[1:43:43]
the language board or committee person,
whoever is answering that email.
[1:43:48]
» Beautiful. Thank you.
>> Thank you, director of operations. Doxy
[1:43:52]
follow question. No. Um you're good.
Council, are you wanting to ask director
[1:43:57]
of operations council?
[1:44:02]
» Can we finish this up and then you can
ask him about something else? Any other
[1:44:06]
discussion? Call for the question. All
in favor?
[1:44:09]
Councelor Pringle, what is the something
else you wanted to ask?
[1:44:13]
» Thank you. I just wanted to ask about
when the crosswalks will be redone and
[1:44:18]
when they are redone, will we be able to
put the um November remembered day or
[1:44:24]
Yeah. Um sorry, I can't think. The
stenciling, can we put that over top so
[1:44:30]
we don't just see red on the roadways?
like we it enhances it a little bit
[1:44:37]
better. I'm just wondering if there'll
be time to do that before November 11th.
[1:44:42]
» Director of Operations Doxy. Um that we
hadn't necessarily planned on doing. We
[1:44:48]
normally do uh some of the pavement
markings every other year. Um we could
[1:44:53]
we could look at it and see if we can
still fit it in. Uh as it gets closer to
[1:44:57]
the rain season as well, it does get
tight, but we can definitely look at
[1:45:02]
that and try
[1:45:06]
followup, councelor Pringle.
>> Well, just the crosswalks are very
[1:45:11]
unseeable
and um so I would think that they it's
[1:45:15]
either
>> come up to the two years or whatever. So
[1:45:18]
I know you guys are really busy, but it
is also safety as well for our kids with
[1:45:23]
them going back to school. So I just was
asking. Thank you.
[1:45:28]
» So director of operations Doxy, is that
a yes or no, sir?
[1:45:33]
Um, yes,
>> it is a yes, we will we will try to get
[1:45:36]
the crosswalks uh done up here um as
we're into the fall season. So, and
[1:45:41]
particularly the the Legion one.
>> Thank you, director of operations. Oxy,
[1:45:44]
you good with that? Council Pringle,
that satisfy your quir. Okay. Number 12,
[1:45:50]
bylaw 12.1, bylaw number 766 to ask 2026
revitalization tax exemption.
[1:45:58]
Move that bylaw number 7662026
revitalization tax exemption be adopted
[1:46:03]
by title only. Who care to move it?
Councelor Wayar. Second by councelor
[1:46:08]
Fost. Discussion.
[1:46:13]
Holy smokes. I was surprised if somebody
else started before you. Councelor
[1:46:18]
Rayar. Councelor Rayar.
>> Uh here we are. Uh we're at the finish
[1:46:22]
line. Um, I think this is a great
opportunity for the village of Gold
[1:46:26]
River to uh really sell development um
to those contractors who uh seem to like
[1:46:33]
to ignore our little town. Um think this
is going to be a great tool uh help us
[1:46:39]
build um build new and you know
renovate. Um I'm so glad to see this
[1:46:45]
here and I look forward to crossing that
finish line.
[1:46:49]
» Thank you, Counc. Anyone else?
[1:46:57]
For those folks that don't know what the
revitalization tax exemption is, I'll
[1:47:00]
give you the thumbnail approach.
Basically, our overview is that we're
[1:47:03]
prepared to defer some of our taxes that
we would normally receive to um
[1:47:08]
developers are prepared to renovate
existing buildings within our community
[1:47:12]
or put in new buildings in our community
and give us a bit of an edge. Um because
[1:47:16]
a lot of times I hear contractors
complaining that it's too expensive to
[1:47:20]
develop out here because of the costs
that are associated with building on the
[1:47:23]
west coast instead of the east coast of
the island. And it gives us a it gives
[1:47:27]
us an edge. Plus it also gives us
something that we can sell in order to
[1:47:31]
help promote um any sort of initiatives
that we want to see happening in the
[1:47:36]
community. I can point to and say,
"Listen, if you're going to invest in
[1:47:39]
this community and bring your business
here and uh put your infrastructure in
[1:47:43]
and um we're going to we're going to
we're going to give you a tax break uh
[1:47:47]
for five years." And uh that means that
the taxpayers are not going to be
[1:47:51]
getting that money for the five years,
but on year six, you will start getting
[1:47:54]
that money. And that might been money
that you're not getting at all because
[1:47:58]
nobody came to do any development or set
up their business before. So that's kind
[1:48:01]
of the rationale behind it. And then
folks that want to take existing
[1:48:05]
businesses or commercial or residential
over $150,000 if they want to do some
[1:48:10]
upgrades, we're going to help them. And
uh we're going to give them a a
[1:48:16]
basically crescendoing or descending tax
breaks um as we go year to year over
[1:48:21]
five years. And uh again it gives us
another just another tool in our toolbox
[1:48:26]
because um most of the time what we're
dealing with is we deal with uh you know
[1:48:32]
things that discourage business and um I
think that's when we'll really encourage
[1:48:36]
business and we're invested we got some
skin in the game now right we've uh
[1:48:39]
we're taking we're we're giving up some
of our potential revenues um in order to
[1:48:45]
attract people in businesses in to do
build start businesses for existing
[1:48:52]
businesses or commercial homes to
upgrade them. And I think uh you know, I
[1:48:56]
remember I was had the debate with the
CEO and some counselors and community
[1:48:59]
members as we went through this and
people said, "Yeah, we need to have an
[1:49:04]
incentive. We need to have something. We
need to have some sort of edge. We need
[1:49:07]
to be able to sell something." And I
remember working with this council and
[1:49:11]
our staff and and I'm glad that we're
here at this point. And I was wondering
[1:49:15]
sometimes these things take a while like
councilor Wayer's kind like, "Yeah, it's
[1:49:18]
finally across the finish line, but But
all I can do is say um thank goodness
[1:49:24]
for the perseverance of all people
involved, council members, staff, and
[1:49:28]
the community because at the end of the
day, I I I'm a little bit of a farmer at
[1:49:34]
heart, community farmer anyways, but I
think we planted some good seeds there
[1:49:38]
and it's um and hopefully um we see them
grow to fruition and u and we see some
[1:49:43]
beneficial things in the community.
Yeah,
[1:49:48]
that might stimulate some discussion.
Councelor
[1:49:51]
Pickard.
>> No, thank [snorts] you to the chair and
[1:49:53]
thanks for your thoughts. I agree with
all of them and thanks councelor Wayer
[1:49:57]
for bringing this to um council to
consider and thanks to staff for taking
[1:50:01]
the time putting it together. And Mayor
Law, you're right. It's things take so
[1:50:05]
much time, but it's just to be
accountable and have transparency and
[1:50:09]
have have us review it and have um
information sent out to the community.
[1:50:13]
And this feels kind of nice to come near
the end of the term as we sat down at
[1:50:17]
the beginning of the four years and set
out our strategic priorities. And a huge
[1:50:21]
one for all of us across the board was
economic development and increase our
[1:50:26]
tax base and make it a bit more diverse
so we can generate a little bit more
[1:50:29]
money for our services and and keep them
up and not put that burden on taxpayers.
[1:50:34]
So this is a really exciting
opportunity. I think it shows the the
[1:50:38]
climate that we're willing to not just
say we want to do economic development,
[1:50:41]
but we really can use one of the tools
in our tool belt that um that is
[1:50:46]
attractive to business and as mayor you
mentioned too, you know, there's there's
[1:50:50]
people that look at different options
and developing and revital and and
[1:50:54]
investing here, but this is really this
is a big card in our back pocket that we
[1:50:58]
can say this might offset some of the um
being remote or the cost of building out
[1:51:04]
here. So I think it's really attractive
and you know there's been some barriers
[1:51:09]
to groups doing investments here and
starting new new development with hydro
[1:51:13]
being a big one but the cost has been a
big one that we've heard. So, this is
[1:51:16]
one thing that we can have have an
effect on and it is a bit of short-term
[1:51:21]
compromise and not having those taxes
right away, but in hopes of growing our
[1:51:25]
tax base, having long-term investment,
and eventually making the community more
[1:51:29]
um more viable and more more robust and
economically more sustainable. So,
[1:51:36]
thanks to everyone for your patience on
this and work on it and look forward to
[1:51:40]
what the future holds with this tax
exemption. Thank you, Mor Pickard.
[1:51:46]
No. No. All good.
All the question. All in favor? Done.
[1:51:55]
Correspondence. That the correspondence
be accepted for information. You can
[1:51:58]
move it. Council. Nobody wants to move
correspondence. Is there something
[1:52:02]
controversial in there? Councilor Ray.
Second by councelor Ringle.
[1:52:10]
Discussion. Seeing none. Call for
question. All in favor? Done. You
[1:52:14]
[snorts] guys must be getting tired. You
want to race through the rest of these
[1:52:16]
items.
>> Okay, new business. Seeing none.
[1:52:21]
Question period. Mr. Roy, do we have any
um inquiries online, sir?
[1:52:26]
» Not at this time. Your worship
>> gallery. Um does anybody wish to come to
[1:52:30]
councelor White?
Go ahead, sir. You know how that you
[1:52:35]
know the drill.
>> Getting used to it. Yeah.
[1:52:42]
» Chris White, 507 Golden Hind place.
>> Chris,
[1:52:47]
» I'm just tickled pink with with the
meeting tonight, you know, like like we
[1:52:53]
are so lucky and and this just just
reinforced everything. I feel good about
[1:52:57]
this place. The fact that we have zero
debt, just that alone, like zero debt to
[1:53:03]
live here. our taxes are reasonable and
it it's just it's just it's just really
[1:53:08]
really good. You guys have done a great
job and I'm just tickled being here and
[1:53:13]
it's just it was just good. It was a
good I feel really good about everything
[1:53:17]
going on here. Thank you for that.
Yeah, I I remember when I was working
[1:53:22]
for the village of Gold River and you'd
hear the squeak squeak squeak squeak and
[1:53:26]
that was uh councelor White walking down
the um hallway
[1:53:31]
looking at the looking at the
dispersements at your bills had to sign
[1:53:36]
off and knocking on everybody's door and
says, "Is this the best that we could
[1:53:40]
do? Can we get it cheaper?" And I used
to be just terrified. [laughter]
[1:53:47]
» Oh, good. like is that my is that one of
is that one of the things that I bought?
[1:53:51]
But one of the things I gained from that
is that um I realized that um it's a
[1:53:57]
petition of trust to have um stewardship
over the public purse and that we're in
[1:54:03]
we've been given a very important role
and that is to make sure that we get the
[1:54:06]
best value for the taxpayers for the
money and that um and people like
[1:54:11]
councelor White at that time and others.
I had a CEO who was
[1:54:16]
» Larry Plur who even squeakaked more than
you did I think um who are they they
[1:54:21]
were very good about managing money and
uh I got beat up a lot. I still got the
[1:54:25]
bruises and stuff but um I think it I
think it made me more more financially
[1:54:30]
conscious because when I got in here the
first thing on my radar was and we
[1:54:34]
shared with this council was that we
need to be financially responsible and
[1:54:38]
get our financial house in order. We
cannot kick this can down the road
[1:54:41]
anymore. We've been doing it since 1997
9 what I remember when I started right
[1:54:47]
and we never had a budget balance and we
never had a budget um operation budget
[1:54:52]
that was balanced and we were constantly
drawing down on our surpluses and
[1:54:56]
reserves and living beyond our means and
we're going to get to the point where
[1:54:59]
the the cupboard was bare and we'd be
shutting down pools and arenas and golf
[1:55:05]
courses and everything else and laying
people off and contracting stuff out and
[1:55:08]
I thought don't ever want to get close
to that.
[1:55:13]
» So, mayor council, that's all I had to
say is just thank you. A heartfelt thank
[1:55:17]
you. You're doing a great job. Tickled
pink and and yeah, thanks.
[1:55:22]
» Yeah, we better have Thank you very
much, Councelor White. We appreciate
[1:55:25]
that.
And uh yeah, and thanks for um like you
[1:55:29]
said, other people before us um deserve
the recognition because like in hockey,
[1:55:34]
there's a term called setting the tone.
You guys set the tone for your, you
[1:55:39]
know, the pre the your council and the
subsequent councils. And I'm hoping that
[1:55:43]
the council after us will look at what
we did during this term, cutting
[1:55:47]
millions and millions of operating
budgets and we had to raise taxes a
[1:55:51]
little bit more than folks wanted them,
but and I I understand that and we
[1:55:55]
wanted lots of grants, but we wanted at
the end of the day I I said to this
[1:55:59]
council is that let's see if we can
achieve something that hasn't been
[1:56:03]
achieved for for all the time that I've
been here since 97. I don't know the
[1:56:07]
math. That's about 20 what, eight years
or something. Um, let's get a balanced
[1:56:11]
budget operationally and and um and
projectwise and yeah, and once we get
[1:56:18]
it, fight like hell to keep it. Don't
ever lose it. [snorts] And uh yeah, and
[1:56:23]
that like you said, with no debt, we're
in pretty good shape. And um I think you
[1:56:29]
see that because I talked to people that
want to invest in our community and
[1:56:32]
they're saying they're going to put a
little bit more money into our community
[1:56:35]
because they see that we got our
financial house in order. Like um Kent
[1:56:39]
O'Neal, they said they they they're
building some things or adding some
[1:56:43]
value buildings down there at his lodge.
And then and then there's a fellow down
[1:56:47]
in the industrial sub down there who's
bought those two lots. All the for the
[1:56:53]
what 27 years I was here, Chris, were
empty. there when nothing was in there.
[1:56:57]
He bought those and now he's developing
those and expanding his business. He
[1:57:02]
said, "Yeah, you guys got your financial
house in order. I'm feel comfortable
[1:57:05]
that you're not this town's not going
to, you know, go bankrupt and um I'm
[1:57:10]
investing some money." So, I think that
not only did we do our work, but um
[1:57:14]
hopefully that reverberates and other
people have confidence and they're
[1:57:17]
willing to um take a risk and invest
some money in in our community. So,
[1:57:22]
yeah. Anyways, I don't know how I got
there. This is just question period. So,
[1:57:25]
I'm not supposed to be going on and on
and on and on and on. Especially when
[1:57:28]
it's nine o' especially when it's nine
o'clock at night. People are going to
[1:57:32]
get upset with me. So, um any other
questions?
[1:57:42]
» Glad you talked for so long. I got a few
things here.
[1:57:45]
» Uh you got as much time as you want. Go
ahead.
[1:57:50]
» I wrote all over it.
So, my first question to the mayor, um,
[1:57:57]
do we no longer do territorial
recognitions at the beginning of
[1:58:00]
meetings or was that just an oversight
tonight?
[1:58:02]
» What's that? I over I missed it.
>> Okay. The other thing that apparently
[1:58:07]
[clears throat] is an oversight that
quite upsets me because it's not the
[1:58:10]
first time. Um, we made a lot of big
deal tonight about all the grants the
[1:58:15]
village gets and you thank Joe a number
of times and no disrespect to you Joe.
[1:58:20]
I'm sure you're you are doing a
wonderful job, but not once did you
[1:58:24]
thank Chelsea Stubs whose job it
literally is to look for grants for this
[1:58:28]
village and that really upsets me
because she does an awful lot of work
[1:58:32]
for us and you never thank her.
>> Yeah, I my apologies. I agree with you.
[1:58:37]
I think Chelsea does a wonderful job for
us and I and I know that um when the
[1:58:43]
grant that we got from ICE TE to provide
for her position when that had expired
[1:58:50]
um at that point I advocated for um
investing in that position and encourage
[1:58:56]
council to continue on with that
employment because I realized how
[1:58:59]
invaluable it was. I think maybe um
>> bad you can't remember to thank her once
[1:59:03]
in a while then that's all I really
wanted to say. Thanks.
[1:59:05]
» You're you're right. Um my next question
is regarding the work in progress. Um
[1:59:10]
last spring I came to council with a
couple of requests. One of them was to
[1:59:15]
have um cemetery awareness day
recognized which we did and it went very
[1:59:18]
well. Um but the other was also to get
the cemetery mapping up and running. I
[1:59:23]
spoke to the SRD money wasn't a problem.
Nothing else seemed to be a problem. I
[1:59:29]
don't think it's been done. So I'm
wondering why it's not on this list.
[1:59:33]
» It's a good question. I don't really
know myself. I'd have to refer it to
[1:59:36]
staff. Staff, would you any staff member
care to um field that question? Director
[1:59:41]
of operations, Doxy,
>> can you use that mic there, Sarah, to
[1:59:45]
respond?
>> It is a work in pro progress. It's it's
[1:59:48]
gone um to the consultant that's working
on our asset management um portfolio and
[1:59:53]
it will be going into the mapping system
and and I don't know exactly when right
[1:59:57]
now it'll go be going live, but it is it
is a project in in in process.
[2:00:03]
» I'm very encouraged to hear that. Can we
get it on the next agenda if it hasn't
[2:00:06]
been finished, please?
>> Sorry. What was your request?
[2:00:10]
» To have it as a literal work in
progress. If it is one and it's not on
[2:00:13]
the agenda now, can we get it
[2:00:18]
» point of order sale?
>> Uh the council never directed this to be
[2:00:22]
placed on the work in order work in
progress for council. It was done on an
[2:00:26]
operational level. Uh but it's uh
council's will.
[2:00:32]
Anyone care to move that?
Councelor Pringle. Second.
[2:00:37]
All in favor of putting it on the list.
Okay. Done. Next.
[2:00:43]
» Uh, do we know how many people work at
Surerac?
[2:00:49]
» Surak. The entire
>> Sorry. Down at our site here like in
[2:00:52]
Gold River. Oh,
>> I No, not exactly. It varies, but last
[2:00:56]
time I had a reading from them, they
said that they're somewhere in the 3540
[2:01:01]
range if [snorts] you include both the
hatchery and um open net fish farming.
[2:01:06]
» And do we know how many of those people
live in Gold River?
[2:01:09]
» I don't, but there is a number of them
that do.
[2:01:13]
» Um also with regard to your
>> I think
[2:01:16]
» meeting with the minister,
>> I think if you wanted that information,
[2:01:20]
you could probably talk to Surerac. I
think Shannon Moberly at Surerac would
[2:01:25]
be able to provide you with that data. I
think she keeps that data.
[2:01:28]
» Well, I was just curious because you
were advocating for them with the
[2:01:31]
Minister of Fisheries and whatnot. So, I
was just curious how many there were.
[2:01:34]
Um, and with regards to that meeting
with the Minister of Fisheries, um, do
[2:01:38]
you know anything about where we're at
with regards to being able to buy fresh
[2:01:41]
seafood at our dock?
>> I don't.
[2:01:44]
» Could we find out what the problems are
with that happening?
[2:01:48]
» I don't know if I could find out, but
I'll look into it. It had it had been
[2:01:52]
discussed some years ago because I knew
we were at a point where the local First
[2:01:56]
Nations could have licenses to sell
things like halibet and whatnot.
[2:02:00]
» Yeah. So, have you looked into it in the
past?
[2:02:04]
» It has been looked into before, but I
was just thinking that with you being in
[2:02:08]
contact with the fisheries minister, it
might have been something you had been
[2:02:11]
asking about.
>> No, I was looking at something
[2:02:14]
different.
>> Okay.
[2:02:15]
» What else have you got?
Um,
[2:02:18]
I had a question about who's going to
UBCM, but you actually did bring that
[2:02:22]
up. And I'm just wondering if one of you
is planning to attend the session on
[2:02:27]
hospital and rural health funding,
[2:02:32]
seeing as that was another thing you
brought up under your regional district
[2:02:36]
meeting,
[2:02:39]
» the funding for Sorry,
>> your question. Can you repeat it again?
[2:02:44]
uh seminar at 2 p.m. on the 14th
regarding regional hospital funding with
[2:02:48]
special regard to rural areas.
>> No, I didn't.
[2:02:52]
» Okay. Um you also rattled off a bunch of
minister meetings. Are those actual
[2:02:56]
meetings that have been scheduled or are
they just meetings that you've already
[2:02:59]
asked for?
>> Um they've been confirmed.
[2:03:03]
» And you also didn't mention the Minister
of Highways. So are they on the list?
[2:03:07]
Well,
say Roy, we've got some correspondence
[2:03:11]
back from the Minister of Highways
concerning Highway 28 that you shared
[2:03:15]
with us. Did you want to share that?
>> Uh the
[2:03:20]
council did not uh do a request for
meeting with the highways ministry this
[2:03:24]
year. Uh but uh conversation with the
ministry is that they are planning to do
[2:03:28]
some work starting this fall on some
base work repairs on Highway 28 near
[2:03:34]
Gold River. Yeah, I remember your
correspondence and it was um indicated
[2:03:38]
that you've been working at staff level
with their managers and they've
[2:03:40]
committed to a number of briefs.
>> An email
[2:03:44]
28 based on our request. Correct.
>> Yeah, I had an email correspondence with
[2:03:48]
highways contact last week where he that
is what he stated. He would be advising
[2:03:52]
of timelines once he had them and it
would be posted on drive BC.
[2:03:56]
» Thank you, sir.
I specifically asked about meetings with
[2:04:00]
the highways minister last spring and
was told that at no point in the
[2:04:03]
previous three years had you met with
them. Um I ser at that time that meant
[2:04:08]
you were going to have a meeting with
them this September and I'm very
[2:04:10]
disappointed to find out that you don't
consider that a high enough priority.
[2:04:14]
» Fair enough.
>> Um
[2:04:16]
» what else have we got?
>> Oh campground.
[2:04:20]
Is the public going to be able to see a
report on where the campground was at
[2:04:24]
this summer compared to previous years?
Director of operations, Doxy,
[2:04:29]
would you care to respond to that
question, sir?
[2:04:33]
Sure.
>> If I may through your worship, we we can
[2:04:36]
put together a report. Um, with the
information that we have in prior years,
[2:04:40]
there is not always consistent
information that was reported on monthly
[2:04:44]
basises, but we can certainly do a
report like kind of a like an annual
[2:04:49]
summary uh total revenue, total revenue,
what we expected and um kind of what
[2:04:54]
projects were were going on and
successful.
[2:04:57]
I would very much like to see that
because although I did also hear a lot
[2:05:01]
of very good comments about work that
had been done at the campground, I also
[2:05:04]
heard from numerous people that they had
not paid to stay there. Nobody had come
[2:05:10]
around to collect money and that was
rather upsetting.
[2:05:16]
That's feedback that's valuable for
operations.
[2:05:19]
Okay. Um,
[2:05:27]
I had another thing, but I'm going to
leave it for now because I still need
[2:05:31]
things from the village.
>> Thank you for your question.
[2:05:33]
» Thank you very much.
>> Anyone else care to um address council?
[2:05:42]
» Nope. No other questions?
Thank you. [laughter]
[2:05:47]
Okay, moving on. No. No. A motion.
Motion to adjurnn in camera. Who would
[2:05:53]
care to make that motion? Councelor
Pringle, second by councelor Waymire.
[2:05:57]
All in favor, folks. We're in now in
camera. So, thank you for coming out. Um
[2:06:02]
enjoy your evening and um
as always
[2:06:08]
» as