My name is Bo Bologn and I have the
[0:02]
honor of serving as chief administrative
[0:04]
officer Fiberia Parish reporting
[0:06]
directly to parish president M. Larry
[0:07]
Rishard. Alongside President Rishard,
[0:10]
our administration and our department
[0:12]
heads, we work as a unified team to
[0:15]
ensure the efficient and effective
[0:16]
operations of Iberia Parish government.
[0:19]
Iberia Powers government is comprised of
[0:21]
33 departments supported by
[0:23]
approximately 300 270 dedicated
[0:26]
employees and managed through an annual
[0:28]
operating budget of over $100 million.
[0:32]
For the past decade, President Rishard's
[0:35]
administration has taken a
[0:36]
business-minded approach to government,
[0:39]
emphasizing fiscal responsibility,
[0:42]
accountability, and the prudent use of
[0:44]
public funds while continuously striving
[0:46]
to enhance the quality of life for the
[0:48]
citizens of Iberia Parish. This
[0:50]
evening's presentation will highlight
[0:52]
several key departments including
[0:54]
finance, public works, Aadiana Regional
[0:58]
Airport, Waterworks District number one,
[1:01]
sewage district, waterworks district
[1:03]
number three, excuse me, sewage district
[1:05]
number one, and animal control. We will
[1:08]
also address additional topics of
[1:10]
interest such as drainage and roadway
[1:12]
improvement projects, the port of
[1:14]
Iberia, and the expansion of our fiber
[1:16]
connectivity to homes and businesses
[1:18]
throughout the parish. Finally, we will
[1:22]
reflect on the accomplishments of the
[1:23]
past decade and share our vision for the
[1:26]
continued progress and future success of
[1:28]
Iberia Parish.
[1:30]
It is now my pleasure to introduce the
[1:32]
individual best suited to speak on these
[1:34]
achievements and outline the parish um
[1:37]
forward. Our parish president M. Larry
[1:40]
Rousard.
[1:43]
[applause]
[1:53]
» Good evening.
[1:55]
» Good evening.
[1:59]
First and foremost, I want to thank God
[2:01]
for allowing me to be here with you all
[2:02]
today.
[2:04]
I would also like to express my
[2:06]
gratitude to my wonderful wife, Kim, and
[2:09]
our children, Tyler and Morgan.
[2:13]
Before I continue, I want to take a
[2:15]
moment to recognize and honor our
[2:18]
veterans who are here with us today.
[2:19]
Would you please stand?
[2:25]
» [applause]
[2:30]
» Thank you all so much. Your courage,
[2:33]
sacrifice, and dedication to defending
[2:35]
our freedoms and the foundation of
[2:38]
strength of this nation is awesome.
[2:42]
We owe you a debt of gratitude that we
[2:44]
can never fully repay. Thank you for
[2:47]
your service and your continued
[2:49]
contribution to our our community.
[2:54]
I am deeply thankful to my
[2:56]
administration staff, my executive
[2:59]
assistant and the provos. Please stand.
[3:03]
[applause]
[3:04]
Communications coordinator Joe Morgan,
[3:09]
she's in the back. She put this thing
[3:10]
together. [applause]
[3:12]
Chief Administrative Officer Boalon,
[3:17]
[applause]
[3:17]
Chief Operating Officer, Michael
[3:19]
Brousard.
[3:22]
Finance Director Erica Duplan,
[3:28]
Human Resource Director Edie Castleman,
[3:34]
purchasing agent Michael Clifton.
[3:38]
[applause]
[3:39]
Their tireless effort and commitment to
[3:42]
serving this community is invaluable. I
[3:45]
would also like to thank all of my
[3:47]
directors and managers, starting with my
[3:49]
security manager, Daryl Manning. Please
[3:51]
stand.
[3:54]
Aadiana Regional Airport Director
[3:56]
Mosanji.
[3:59]
[applause]
[4:00]
Animal Control Manager Amanda East,
[4:04]
[applause]
[4:06]
Office of Homeland Security and
[4:07]
Emergencies Preparedness Brandon Migas.
[4:10]
[applause]
[4:12]
And you have a lot of work to do for the
[4:14]
next few days. Brandon,
[4:16]
library director Marjorie Hill,
[4:20]
[applause]
[4:22]
mosquito control director, Herbs Jones,
[4:27]
Parks and Recreation Director Tammy
[4:29]
Troh,
[4:33]
Section 8 housing administrator
[4:36]
Christina Francis.
[4:39]
[applause]
[4:41]
Y'all should have all been sitting way
[4:42]
up here.
[4:44]
[clears throat and cough]
[4:45]
Waterwork and surge district director
[4:48]
Brad Crater.
[4:50]
[applause]
[4:51]
GIS specialist Amy
[4:55]
Brazar.
[4:57]
Brad [applause]
[5:01]
Network administrator Michael Pjan. He's
[5:03]
not here. U he got some things going on
[5:05]
right now, but Mike is our network
[5:08]
administration administrator. Thank you
[5:10]
to Mike permit and planning and zoning
[5:12]
manager Agnes Connor
[5:16]
[applause]
[5:18]
facility supervisor
[5:20]
Bill who you who where you at Bill
[5:24]
[applause]
[5:25]
and someone that's not on my list is my
[5:28]
my budget officer my budget person and I
[5:31]
got to talk about him Gary where are you
[5:33]
Gary
[5:35]
» There you go to mention you Gary your
[5:38]
leadership and hard work ensures that we
[5:40]
continue to move forward as a parish and
[5:43]
your contribution do not [clears throat]
[5:45]
go unnoticed. I would also like to thank
[5:47]
all of the employees of a Berry Parish
[5:49]
government for the work that they do to
[5:51]
keep this parish flourishing.
[5:55]
Thank to all of you for being a part of
[5:56]
this journey as we continue to work
[5:59]
together to make progress in a barrier
[6:00]
parish.
[6:02]
It is both an honor and a privilege to
[6:04]
stand before you today as we reflect on
[6:06]
the accomplishments of Aaria Parish and
[6:09]
I look forward to the promising future
[6:11]
that lies ahead. Together we have faced
[6:14]
challenges,
[6:16]
seized opportunities
[6:18]
and witnessed remarkable growth of our
[6:21]
parish.
[6:22]
From expanding industries to critical
[6:24]
infrastructure investments,
[6:26]
Aaria Paris has invoken into a vibrant a
[6:30]
vibrant thriving community that we all
[6:33]
can be proud of and I'm certainly proud
[6:35]
of it. Tonight,
[6:38]
I invite you to join me as we celebrate
[6:40]
our progress,
[6:43]
recognize the dedication, the dedicated
[6:45]
efforts of our businesses and leaders,
[6:49]
and discuss how we lay the foundation
[6:51]
for an even brighter future tomorrow.
[6:55]
It's it's an [clears throat] exciting
[6:57]
time in Iberia Parish as we have much to
[7:00]
share about the positive transformation
[7:02]
that's underway.
[7:05]
But before I go anywhere say anything
[7:07]
else, I want to make sure that I
[7:09]
recognize my friend Mike Tarantino,
[7:15]
who is also the president and CEO of the
[7:17]
Iberia Industrial Development Foundation
[7:20]
and the Iberia Economic Development
[7:23]
Authority. Mike and I work extremely
[7:25]
close together, and you're going to see
[7:27]
later when that started. I've already
[7:29]
acknowledged the current parish uh
[7:31]
councilman's um and now I want to
[7:34]
acknowledge uh wait a minute before I
[7:37]
move forward I want to acknowledge all
[7:39]
the parish councilmen. Stand up please
[7:40]
to be recognized.
[7:45]
[applause]
[7:48]
We have um we have an unbelievable
[7:50]
council. Uh the council that we have we
[7:53]
have done some great things together.
[7:55]
Uh, I mean, we work together as a team
[7:58]
and um, [clears throat]
[8:00]
we're getting some things accomplished
[8:02]
here. Actually, I'm actually missing a
[8:04]
paper where I was going to acknowledge
[8:06]
you guys, but it's not on here. So, I'm
[8:08]
just going to go and tell you guys how
[8:09]
proud I am of you. Not only you, your
[8:12]
clerk, uh, and everyone that works with
[8:14]
Iberia Parish to do the things that we
[8:16]
do. We just reelected a new who is the
[8:19]
same person as the chairman of the
[8:20]
council, James Trohol.
[8:23]
[applause]
[8:26]
Prior to that, we had a chairman for
[8:27]
four years, Warren Gosan.
[8:31]
We're doing great things with your guys
[8:33]
with you guys helping. Uh so let's make
[8:36]
sure that we continue to do that. At
[8:39]
this time, I want to get every elected
[8:41]
official in here to stand up, excluding
[8:44]
the parish councilman to be recognized.
[8:46]
Past and current.
[8:51]
[applause]
[8:52]
Okay.
[8:54]
Okay, we have I seen the mayor uh
[8:57]
Freddy, I seen Ricky, Mayor Promp, and
[9:01]
also the district attorney is here. So,
[9:02]
I got to recognize him. He might do
[9:04]
something to me. Um,
[9:08]
so with that said, let me see something.
[9:10]
Cindy just brought me the actual page
[9:12]
that I was looking for. But thanks to
[9:14]
everyone for being here tonight and uh
[9:16]
your continued support and commitment to
[9:19]
making our barrier parish a place where
[9:21]
opportunities
[9:22]
um innovation and prosperity for uh
[9:25]
flourish. So you're going to get to hear
[9:27]
a little bit about what we doing in
[9:28]
Iberia Parish right now and uh hopefully
[9:31]
you guys like it. Thank you. Have a
[9:33]
blessed day until I finish
[9:39]
[applause]
[9:40]
the
[9:40]
» President. Absolutely. Absolutely. here.
[9:43]
Let me put this mic on.
[9:44]
» Yes, sir.
[9:45]
» Let me put this mic on, Mike.
[9:48]
» All ready to go.
[9:49]
» Yes, sir.
[9:51]
» Well, as Mr. Rishard is sitting down, I
[9:53]
just want to express my thanks and my
[9:55]
it's certainly my honor to be here and
[9:57]
uh to do this again with you. Thank you
[9:59]
so much for the invitation to join you
[10:01]
tonight, which is for what is our 10th
[10:03]
year opportunity uh to do this to talk
[10:06]
about uh the wonderful progress going on
[10:08]
in our parish and the optimistic reasons
[10:10]
why we should all be optimistic in the
[10:12]
future uh as we talk through the 2025
[10:15]
state of the parish. You'll hear me say
[10:17]
it again at the end, but I really
[10:18]
appreciate all the citizens that are out
[10:20]
here tonight uh to uh to hear about that
[10:23]
progress and to and to join with me uh
[10:26]
as we as we walk through it. I just want
[10:27]
to uh turn your attention to the QR code
[10:30]
that's up on the screen right now. If
[10:32]
you'd like to scan that QR code, please
[10:33]
feel free to do so. Uh that's that will
[10:36]
uh bring you to the tonight's
[10:37]
presentation so you can follow along in
[10:39]
your mobile device. There'll also be
[10:41]
another QR code later in the in the
[10:43]
process which will which will give you
[10:44]
some additional information. But we'll
[10:46]
go ahead and jump right in.
[10:48]
» I'm ready. So Iberia Parish um
[10:53]
a lot of different things going on with
[10:54]
Iberia Parish government and a lot of
[10:56]
different ways that the citizens and
[10:57]
taxpayers interact with Iberia Parish
[11:00]
government. Iberia Parish uh funding in
[11:02]
many ways and we'll find out tonight is
[11:04]
from the hardworking citizens and their
[11:06]
hard-earned tax dollars. And so as
[11:08]
citizens we expect our uh tax dollars to
[11:11]
be used wisely and our finances to be
[11:14]
handled responsibly and professionally.
[11:16]
And we certainly that is certainly the
[11:18]
case within parish government. Let's
[11:20]
just talk a little about what's going on
[11:21]
within the finance department.
[11:23]
» Our finance department oversees all of
[11:25]
the finance u accounting functions. They
[11:28]
do the collections, the the receivables,
[11:31]
the whole nine yard payroll. Um they
[11:34]
also play a key role in budgeting and
[11:35]
auditing. They accounting is a
[11:38]
department that I have to talk to daily
[11:40]
because everything that we do in Paris
[11:41]
business goes through accounting. uh you
[11:43]
know no matter what it is if it's
[11:45]
something with purchasing it's going to
[11:46]
go through accounting and I I am one
[11:48]
that truly believe in working close with
[11:51]
my director of accounting and the staff
[11:53]
that she have. So when you talk about
[11:55]
when we talk about account accounting
[11:57]
there are many generally accepted
[11:58]
accounting principles best practices
[12:00]
that happen in everyday business when it
[12:03]
comes to accounting uh and one of those
[12:05]
measurements is is the cash on hand that
[12:08]
a business or a governmental body may
[12:09]
have. So tell us a little bit about the
[12:11]
cash on hand at parish government where
[12:13]
it's been.
[12:14]
» Well in 2016 when we came in I have
[12:18]
several councilmans that's here when we
[12:19]
started together we had nine new
[12:21]
councilmans when I got elected as the
[12:22]
president. We had 29 days cash on hand.
[12:26]
Um and we had some $460,000 or something
[12:29]
like that. Right now we have 377 days
[12:33]
cash on hand. Uh roughly six you know
[12:36]
close to $6.5 million. Actually we
[12:39]
spending down a little bit right now
[12:40]
because we have monies coming in right
[12:43]
now from various places. Aaria parish
[12:46]
only have two dedicated funds.
[12:48]
» One is the general fund and one is the
[12:50]
uh royalty fund which you we can talk
[12:52]
about it later. Um is a fund that's
[12:55]
basically depleted. We only receive
[12:56]
around $151,000 a year from that.
[12:59]
» But cash on hand means a lot to me
[13:01]
because we have emergencies. We have
[13:02]
things that could take place and you
[13:04]
need to have money to be able to address
[13:06]
those things. For example, if we have a
[13:08]
hurricane or some type of emergency, we
[13:10]
have to pay for that. We get reimbursed
[13:13]
uh after, but some of that take time.
[13:15]
So, I would like to see the um cash on
[13:17]
hand be um you know, a lot more money.
[13:20]
Not necessarily cash on hand, but I
[13:22]
would like to see have a lot more money.
[13:23]
» Absolutely. Absolutely. And so, uh you
[13:25]
mentioned just now about the two main
[13:28]
funds that fund parish government. Um
[13:31]
one of those is the general fund. Let's
[13:33]
talk about the general fund. Um, where
[13:35]
it's been and where it's going.
[13:37]
» Well, when we got here, it was pretty
[13:39]
low. Um,
[13:41]
I mean, pretty low, right? If I'm not
[13:42]
mistaken, we had a deficit. I'm trying
[13:44]
not to say that, but it was extremely
[13:45]
low. And so, we actually took this thing
[13:48]
in 17 from somewhere around $700,000
[13:52]
uh to right now we have over $6 million
[13:54]
in the general fund. Has been a
[13:55]
progression, steady progression uh that
[13:57]
we have. But the general fund is used to
[14:00]
help us leverage dollars. We use a lot
[14:02]
of dollars from the federal government
[14:04]
and the state government.
[14:04]
» Right.
[14:05]
» So, one thing I learned early on in the
[14:07]
council and I, we made sure that every
[14:09]
dollar that we're going to use, if
[14:11]
possible, we're going to leverage it.
[14:13]
» Absolutely. And you know, so so when as
[14:15]
we talk about the general fund, which by
[14:17]
the way is the fund where most of the
[14:19]
parishes uh business is handled, right?
[14:21]
» Well, the general fund is is is the
[14:23]
money that comes in where we can use
[14:26]
that money for anything that we want to
[14:27]
use it for. And that's why I personally
[14:30]
would like to see the general fund
[14:31]
somewhere around 1012 billion.
[14:33]
» Well, another indication of the health
[14:35]
of the general fund that uh business
[14:37]
people are aware of of course is
[14:39]
revenues versus versus expenditures. And
[14:42]
this is a look at uh the the current
[14:44]
state of the parishes revenues versus
[14:46]
expenditures in the general fund. Talk a
[14:48]
little bit about that.
[14:49]
» I think that the parish council, our
[14:51]
finance department, everyone, I think
[14:52]
they've done a fantastic job when you
[14:54]
talk about revenue and you talk about
[14:56]
expenses. We have made a complete
[14:58]
divide. You can see a serious separation
[15:00]
that take place from the money that we
[15:01]
get in from the money that we spend. Uh
[15:04]
it's all about trying to have smart
[15:05]
management. Um and I'm very fortunate
[15:08]
that we have a group of people and I
[15:09]
can't say enough about the council
[15:11]
because the council
[15:13]
I I do things but to be honest with you,
[15:15]
I go to my council with everything,
[15:16]
» Right?
[15:17]
» And uh get them to understand what it is
[15:19]
that we're doing. We have an extremely
[15:20]
good finance uh chairperson. We have
[15:23]
good chairpeople all over the council.
[15:25]
So, we're doing a great job as you can
[15:27]
tell. Um, we have a serious separation
[15:30]
between our revenue and our
[15:31]
» And that's a great thing. That's a great
[15:33]
thing. So, uh, we we spoke about the
[15:35]
general fund and how important that is
[15:37]
to operations in the parish and the
[15:39]
health the certain certainly the health
[15:40]
of revenues versus expenditures, but you
[15:43]
also mentioned that other fund and
[15:44]
that's the royalty fund. Let's let's
[15:45]
talk just a little bit about that.
[15:47]
» You know, Mike, I've been doing this a
[15:48]
long time. I got elected in 99, took
[15:50]
office in 2000 as a councilman. We used
[15:52]
to have $6 million $7 million in a
[15:54]
royalty fund is serious decline. We down
[15:58]
to like 150 plus $151,000 a year. In
[16:02]
fact, when I'm I don't really
[16:04]
concentrate a whole lot on the on the
[16:05]
royalty fund to be honest with you. Now,
[16:07]
we take monies from the general fund to
[16:09]
put into the royalty fund to do certain
[16:11]
things running through it, but I don't
[16:13]
see the royalty fund coming anytime
[16:15]
soon. IA parish of course have always
[16:17]
been an oil and gas parish agriculture
[16:20]
parish and it will always be absolutely
[16:22]
» But we're not receiving a whole lot of
[16:23]
money from royalties at this time.
[16:25]
» Okay. Well, you know um citizens
[16:27]
interact with parish government in in
[16:29]
many ways. Um and I would venture to say
[16:32]
that one of the big ways that that
[16:33]
citizens uh interact with parish
[16:35]
government on a regular basis is through
[16:38]
the public works department. Tell us a
[16:40]
little bit about public works. What's
[16:41]
going on over there? Public Works is
[16:42]
responsible for land management as well
[16:44]
as water management. We only have 30
[16:47]
employees working at public works right
[16:48]
now. So, we're hiring. So, if anybody
[16:50]
here know anyone looking for a job, tell
[16:52]
them to go on Iberia Parish government
[16:54]
website and uh fill out an application
[16:55]
because we are hiring. Uh prior to us
[16:58]
getting here, I'm saying to us, prior to
[16:59]
me getting here been 16, public works
[17:02]
had roughly 60 employees. We're down to
[17:04]
30, but believe me, we have found a way
[17:06]
to make that work. We're gonna we're
[17:08]
gonna find out here in just a second how
[17:10]
busy those 30 people are. I can tell
[17:12]
you. So, you mentioned uh land
[17:14]
management and the other is water
[17:16]
management, of course. Let's start with
[17:17]
land management. Let's just talk about
[17:19]
some of the things that are happening
[17:20]
and some of the things public works does
[17:21]
in the land management department.
[17:23]
» Uh land management, we have over 400
[17:25]
miles of roads. Um
[17:27]
» That's about here to Houston.
[17:29]
» That's right. That's right. We have 66
[17:30]
bridges. 55 or so of those bridges are
[17:33]
offsystem bridges which simply mean that
[17:35]
they're handled by barrier parish
[17:36]
government and the department of
[17:37]
transportation. Uh they're responsible
[17:39]
for like road repairs for striping for
[17:42]
wash outs for tree trimming uh
[17:44]
slashbusting. We do all kind of things
[17:46]
that landfield operation. They have to
[17:48]
deal with illegal dumping. They deal
[17:50]
with litter abatement. We have a lot of
[17:52]
things that we do with uh with land
[17:54]
management at public works.
[17:55]
» So as a coastal parish, you know, we're
[17:57]
going to talk about that just position
[17:58]
in just a second. Uh but being a coastal
[18:01]
parish, we got that love hate hate
[18:02]
relationship with our water and I know
[18:04]
that I know that uh uh public works does
[18:06]
a lot in the water management uh
[18:09]
department. Let's talk a little bit
[18:10]
about that.
[18:10]
» Well,
[18:12]
water management, we have over 800 miles
[18:14]
of roadside ditches that we actually
[18:17]
maintain. Uh you're talking about field
[18:19]
laterals, you're talking about man
[18:20]
channels. Uh they do things like build
[18:22]
bulkheads. They take care of things like
[18:24]
catch basins and ditch cleaning and
[18:26]
channel clearing and all this good stuff
[18:29]
including dealing with our beaver dams
[18:31]
that we have here. We have some
[18:32]
extremely smart beavers.
[18:34]
» Even even at Iberia Parish beavers.
[18:36]
» Yeah, we have some extremely smart
[18:38]
beavers. So public works can go out and
[18:40]
do something today and you give it a
[18:42]
week, they have another problem. So it's
[18:44]
a constant it's a constant job that they
[18:46]
do. And I'm I'm very um impressed with
[18:49]
the 30 people that work at public works.
[18:50]
That's the most visible
[18:51]
» Right
[18:52]
» Department that we have in our parish
[18:54]
government. I mean they work hard. Um
[18:56]
they do need to take a break you know
[18:58]
twice one in the morning and one in the
[19:00]
afternoon and I can tell you I can wait
[19:02]
uh for 9:00 in the morning 10 o'clock in
[19:05]
the morning someone pass and they seen
[19:06]
someone taking a break and they're like
[19:08]
they wasn't working.
[19:09]
» Uh but the job got done you know. So we
[19:11]
we have people that works in public work
[19:14]
not machines.
[19:15]
» Well the machine the people operate the
[19:16]
machines.
[19:17]
» Right. Right. Well, one of the ways that
[19:18]
public works, you know, that that people
[19:20]
see the results of public works is when
[19:22]
we have storms and rain and and you
[19:24]
know, sometimes flooding and things like
[19:26]
that. Um, and so let's just talk just a
[19:28]
little bit about uh recent drainage work
[19:30]
that's been completed.
[19:31]
» Well, we keep a tally on all the
[19:33]
drainage work that we do in Iberia Paris
[19:35]
since I started in 2016. As far as
[19:37]
roadsides, drainage and cleaning, we've
[19:40]
done 561 miles.
[19:42]
» Uh, 56
[19:43]
» 561 miles. That's pretty serious. slash
[19:46]
bustings and clearing of rightways.
[19:48]
We've done 100 over 100 miles there and
[19:50]
main channel cleaning and lateral
[19:52]
chaining uh cleaning we've done around
[19:54]
186 miles. So the um public works
[19:57]
department is really really working.
[19:59]
Well, we started something um a little
[20:01]
bit different in 2025. We're going to
[20:03]
outsource more work
[20:05]
» Which extends tax dollars.
[20:07]
» Exactly. And the reason I'm I'm I'm
[20:08]
looking at that and the council and I we
[20:10]
talked about that is because it's hard
[20:12]
to hire employees right now with the
[20:14]
wages that we actually pay. So we
[20:17]
outsourcing and we really see that we're
[20:19]
getting a better we're getting actually
[20:20]
more work done because when you think
[20:21]
about it you're paying employees salary
[20:23]
you're playing you're paying that
[20:25]
benefits you're paying their retirement
[20:26]
right
[20:27]
» So we outsourced a couple of jobs so far
[20:29]
this year uh a channel called M10 um
[20:32]
they did a fantastic job that was the
[20:34]
test job to see how it was going to
[20:36]
work. We bid it out. We outsourced it.
[20:38]
It worked extremely good. We did another
[20:39]
channel, the L2 L2D4. Uh it worked
[20:43]
extremely good. So, we're going to do a
[20:44]
lot more uh this year. We're working
[20:46]
with our um um director of public works
[20:50]
and he's finding different things that
[20:52]
need to be done. What we feel we need to
[20:54]
outsource, we will. Right.
[20:55]
» And what we can do in house, we'll do
[20:56]
that.
[20:57]
» Very good. Staying in the uh the water
[20:59]
management lane and our coastal parish
[21:01]
and things like that. Some, you know,
[21:03]
drainage [clears throat] helps us take
[21:04]
the water out. flood. Sometimes we've
[21:06]
got to control those floods when water
[21:08]
comes in and whatnot. Let's talk just a
[21:10]
little bit about some of the recent
[21:11]
flood control structures that parish
[21:13]
that the parish has completed.
[21:14]
» Uh, okay. We started doing flood looking
[21:17]
into flood control structures right
[21:19]
after we started receiving goes money.
[21:21]
That's the money that we that we started
[21:22]
to collect from u the u BP. Uh what we
[21:27]
have done so far, we've done the
[21:28]
Jefferson Canal North, Jefferson Canal
[21:30]
South. We completed those two projects
[21:32]
so far and and you and basically what
[21:35]
you're doing, Mike, you're keeping the
[21:36]
water that that actually comes in
[21:38]
» Through a channel with a high tide and
[21:41]
then uh it goes out when a low tide. So
[21:43]
basically what we have with those flood
[21:44]
control structures, they're no more than
[21:47]
like a block valve,
[21:48]
» Right?
[21:48]
» When when the water start to come in, it
[21:50]
blocks the water from coming in and as
[21:52]
the water start to go out, if it goes
[21:54]
out lower than what you have on the
[21:55]
other side, it goes out as well. So,
[21:58]
we're going to be able to use those
[21:59]
channels as [clears throat] retention
[22:01]
detention ponds that we currently have.
[22:03]
So, it was a pretty good deal. We um
[22:05]
started doing that with CPA uh quite
[22:08]
some time
[22:08]
» Protection and restoration authority.
[22:10]
» Yes. I guess I'm doing it too much. I'm
[22:11]
just giving acronyms, right? A lot of
[22:12]
acronyms.
[22:13]
» Um and right now we have [clears throat]
[22:14]
under construction right now we have
[22:16]
people's uh that's going to be
[22:18]
completed uh in February.
[22:21]
uh upcoming projects that we have right
[22:24]
now for those flood control structures.
[22:25]
We have u little valley um bayou that
[22:28]
we're doing Ruten Real Stompy Valley. Uh
[22:30]
we got about $19 million worth of
[22:32]
projects right there. And I want to tell
[22:34]
you something that the council again I
[22:36]
got to go back to council because we
[22:37]
worked together. When we first started
[22:39]
to receive G Mesa dollars, we was asked
[22:43]
almost told that we needed to bond
[22:45]
because we figured we was going to get
[22:46]
$20 million in 20 years. And we was
[22:49]
going to bond the $20 million for 20
[22:50]
years. And I think there was three or
[22:52]
four projects that we could do. By the
[22:54]
time this thing is over, you're going to
[22:56]
hear how much money uh we're going to be
[22:58]
receiving from um CPA and that we have
[23:01]
already received. But just those
[23:02]
projects that I mentioned, that's $19
[23:04]
million that we dealing with right now.
[23:06]
spectacular. It's all about protecting
[23:07]
the water that's coming from the Gulf to
[23:09]
these people that live on the coast.
[23:12]
» Uh upcoming projects, Mike, uh that we
[23:15]
have going on, we got the commercial
[23:16]
canal, we got the Delin Canal. Uh the
[23:18]
engineering and design is being done
[23:20]
right now by raw engineering. That's a
[23:22]
big deal. That's about $15 million right
[23:23]
there. The total project uh is going to
[23:26]
cost around uh $210 million just for the
[23:29]
work. I'm not talking the engineer. All
[23:32]
of that is being funded by CP. We've
[23:34]
built an unbelievable relationship with
[23:36]
CPA to where now we have some things
[23:39]
that uh we're getting done and we're not
[23:41]
even putting a penny into it. But that's
[23:43]
called collaborating and working with
[23:46]
» Another way of extending tax dollars by
[23:48]
bringing in state partners and federal
[23:49]
partners and other agencies,
[23:51]
» Right? And when you look at commercial
[23:52]
canal and you look at um the DelM canal,
[23:55]
these are huge structures. This is not
[23:58]
the little flood control structures. And
[24:01]
this is going to work and match up with
[24:02]
the um eventually we're going to have a
[24:04]
levy in Iberia Parish. This is going to
[24:06]
match up with that levy to where you can
[24:08]
actually protect the water from coming
[24:09]
into Iberia Parish because if we don't,
[24:12]
» We won't be able to pay uh the insurance
[24:14]
cost in Iberia Parish. So, we're going
[24:15]
to have to understand where we live and
[24:17]
and let's get this done. Uh but it's a
[24:19]
big deal and all of that's being funded
[24:21]
by CPA.
[24:22]
» So, we hear about these drainage
[24:23]
projects and a lot of them are being
[24:25]
completed and uh they don't they don't
[24:27]
appear out of nowhere, right? They they
[24:29]
you mentioned that they're studied and
[24:31]
they're evaluated for you know
[24:33]
efficiency and then their cost that I
[24:35]
see bit you know many are bidding on it
[24:37]
to get the right lowest price. All of
[24:39]
that starts with good drainage studies.
[24:42]
So let's talk a little bit about
[24:43]
drainage studies and particularly in
[24:45]
this case Tibu. What's happening with T?
[24:47]
» Well Tayou we actually uh doing a study
[24:50]
right now. The council already u took
[24:51]
care of that with me. Uh that's T by T
[24:54]
Bayou actually starts in the city and it
[24:56]
goes straight through the to the lake
[24:58]
and actually goes all the way to St.
[25:00]
Mary Parish. Uh we have U Royal Royal is
[25:04]
doing the leading the study. Fence
[25:07]
Jamaica is doing some work on that
[25:08]
simply because they actually did some
[25:10]
work many years ago in Tibu. But is at a
[25:13]
point now with what we have going on in
[25:15]
Iberia Parish and of course I parish
[25:17]
surrounds every everything we have here.
[25:20]
we need to start a dealing with drainage
[25:22]
from the beginning to the end. So, this
[25:24]
project that we're looking at at T
[25:26]
Bayou, the estimate that we have once
[25:28]
the engineering uh is done, we figure
[25:31]
that's going to be around $12 million or
[25:32]
more. So, that's a big deal for us. Uh
[25:35]
and we're looking to um basically what
[25:38]
that's going to do, Mike, is going to
[25:39]
combine all of the improvements and
[25:41]
provide a greater watershed for the
[25:43]
parish. Right. And uh that's what we all
[25:45]
trying to get done right now.
[25:46]
» Absolutely. Well, while we're talking
[25:48]
about drainage studies, tell us a little
[25:49]
bit about what's happening in Cotto.
[25:52]
[clears throat]
[25:53]
In 2016, I guess 8 months after I got
[25:56]
elected, we had a huge flood here and
[25:58]
Coto got wiped out and we did a whole
[26:02]
lot of things trying to figure out there
[26:03]
were certain areas that was flooding
[26:05]
around the park, around just certain
[26:08]
areas in Coto. And we would do what we
[26:10]
thought was the correct thing to do. You
[26:12]
go and you clean this channel out, you
[26:13]
move these jars or whatever the case is.
[26:15]
It's not working,
[26:16]
» Right? So, what we're doing right now,
[26:17]
the parish council approved for me to
[26:19]
get a a drainage study done, and we have
[26:22]
a complete drainage study being done
[26:23]
right now. We have a lot of development
[26:26]
uh home developments that's wanting to
[26:27]
come into Alberia Parish. In particular,
[26:29]
there's one developer want to build
[26:32]
around the Catholic Cade Road near Cotto
[26:35]
and he can, but I'm actually telling
[26:36]
them to slow it down a little bit
[26:38]
because we have some drainage issues. Uh
[26:41]
but now basically what I feel been
[26:43]
taking place with with uh with drainage
[26:46]
and people building is you have 30 acres
[26:48]
or whatever the case is someone getting
[26:50]
ready to build a subdivision and they do
[26:52]
the the flood analysis and it's all
[26:54]
great because they're doing the the
[26:55]
flood analysis on that 30 acres. The
[26:57]
problem is what happens to all that
[27:00]
water when it get off of those 30 acres
[27:02]
to the surrounding areas. So right now
[27:04]
we're changing up a lot in our barrier
[27:06]
parish and the parish council I feel
[27:08]
strong is going to uh we're going to
[27:10]
change some of the ordinances that we
[27:11]
have to make sure these things are
[27:12]
working right. But Koto we will end up
[27:15]
with uh adding a couple of detentions. I
[27:17]
have to from what I'm seeing so far
[27:19]
we're going to add some detention uh
[27:21]
ponds and some uh diversion channels and
[27:23]
things like that in the Koto area. But
[27:25]
we're looking for a long-term benefit.
[27:26]
» Absolutely. We want to get something to
[27:28]
where when someone build a subdivision
[27:30]
somewhere, you're not messing up the
[27:31]
people that was there in prior.
[27:33]
» Right. So staying on drainage studies,
[27:35]
tell us a little bit about what's going
[27:36]
on with the Bayou Park Purdue study.
[27:39]
» Bayou Park Purdue. Uh I guess somewhere
[27:41]
around uh 200 I'm going to say 18 or 19.
[27:46]
Um Governor John Bell had some $25
[27:49]
million that came to the Aadan came to
[27:52]
Kadan. I happen to be the chairman of
[27:54]
the Aadiana planning commission, right?
[27:56]
And uh basically what happened, Iberia
[27:58]
Parish end up with some $5.5 million.
[28:01]
Fortunately,
[28:03]
uh Youngsville, Lafayette ended up with
[28:04]
$5 million. And um Youngsville actually
[28:08]
was shuttle ready. That's a big deal
[28:10]
that we wasn't there many years ago,
[28:12]
believe me.
[28:13]
» So they were they were in a position to
[28:15]
where they could start the project. They
[28:16]
have since completed the project. Now
[28:19]
we're doing ours. We've actually sent
[28:20]
all of the paperwork off to get approved
[28:23]
um to do our work. Now, that's going to
[28:25]
cause not cause that's going to call for
[28:28]
retention dep uh retention detention
[28:31]
ponds as well. We're doing all the
[28:33]
modeling. So, right now, every engineer
[28:36]
that's working in our barrier parish
[28:37]
that's doing any type of coastal stuff
[28:39]
for us, we're looking at all of the
[28:41]
modeling that's been done in our barrier
[28:43]
parish, period. Whether it was done by
[28:45]
raw engineers, uh fence maker, the
[28:48]
federal government, we're taking all of
[28:50]
these models and we work all these
[28:52]
models together. So when we're telling
[28:54]
people that they can build a home
[28:55]
somewhere, we're looking at everything
[28:57]
that's going on that
[28:59]
» Right. So um in the long run it's going
[29:01]
to be a great thing for our parish.
[29:03]
Again um I'm going to talk about my
[29:07]
council a lot because all of this go
[29:09]
through the council and they have the um
[29:13]
they have the leadership or the
[29:16]
management skills to where they
[29:17]
understand what it is when I'm telling
[29:19]
them those that's listen. But anyway, um
[29:22]
we have u some what we're going to do
[29:24]
right here uh is going to help out a
[29:26]
whole lot. So,
[29:28]
» Absolutely. Absolutely. So, as we talk
[29:30]
about uh drainage studies, uh we talked
[29:32]
about a little bit before the uh before
[29:34]
the talk tonight, we talked about how
[29:35]
that's prioritized internally. Let's
[29:38]
talk a little bit about Iberia Parish
[29:39]
drainage uh prioritization.
[29:41]
» Basically, what we're doing right now,
[29:43]
Mike, this whole thing is talking about
[29:45]
how we're going to handle channels and
[29:47]
laterals moving forward. uh working with
[29:49]
our public works department uh working
[29:51]
with the different engineers that we
[29:53]
have in Iberia Parish.
[29:55]
Our public works department is going to
[29:57]
we're going to work together and they're
[29:58]
going to come up with these channels and
[29:59]
they're going to say, "Well, we can
[30:00]
actually manage cleaning this particular
[30:02]
channel or this particular U lateral,
[30:05]
this main channel or this particular
[30:07]
lateral. We think it would be beneficial
[30:09]
for us to actually outsource this." So,
[30:11]
that's what this is all about. It's just
[30:13]
prioritizing what we're going to do as
[30:14]
far as maintenance in-house and what
[30:16]
we're going to outsource. um we got to
[30:18]
pay attention to the to the lowline
[30:20]
flood plane areas that we have in the
[30:21]
parish. Uh so we we always concern about
[30:25]
tail water with having anything that's
[30:26]
taking place here. So you always concern
[30:28]
yourself about that.
[30:29]
» Absolutely. So as we move away a little
[30:31]
bit from drainage and from uh you know
[30:33]
that kind of thing. We're going to be
[30:34]
talking a lot about infrastructure uh
[30:36]
tonight. Another thing that the citizens
[30:39]
are very you know follow very closely as
[30:42]
it pertains to public works and
[30:43]
infrastructure. you know, we drive
[30:45]
around the parish every day con to work
[30:47]
and to school uh to [clears throat] live
[30:49]
our lives, right? And so roadway
[30:51]
improvements are are very very
[30:53]
important. Let's talk a little bit about
[30:55]
the roadway improvement projects coming.
[30:57]
» It's extremely important. I got um three
[30:59]
guys about about they're raising their
[31:01]
hands up. When I walked here, they were
[31:02]
talking about their roads and getting
[31:04]
the roads. In fact, the parish uh we
[31:06]
just had a tax pass about a year and a
[31:08]
half ago or whatever. And uh the
[31:10]
gentleman's that's actually raised their
[31:12]
hand up. was instrumental in us getting
[31:14]
this tax passed. So they would go to all
[31:15]
of these different meetings with us and
[31:17]
uh so they was talking to me about about
[31:19]
some of the roads that's getting done
[31:21]
and we have about 33 [clears throat]
[31:22]
roads that we have already bid out
[31:25]
already awarded contracts to all of
[31:27]
those roads. Uh some of them have
[31:29]
already started. uh some of them is
[31:31]
going to be starting in a minute for
[31:32]
example and I'll get to them later with
[31:34]
the ones that's going to be starting in
[31:35]
a minute but what we did this is a phase
[31:37]
one project we actually had a we called
[31:41]
it project AB and C so we used three
[31:44]
different engineering companies uh to do
[31:46]
the work to actually go out and uh do
[31:48]
all of the design that need to be done
[31:49]
with these work the first company uh is
[31:52]
uh project ANS Bayro inhabits every one
[31:55]
of those roads is already um awarded
[31:57]
that's awarded to Glenn Lege Okay. And
[32:00]
we talking about roads like C Romero,
[32:03]
uh, Jack Brooks, Manat road all the way
[32:06]
to the general roads up in the Coto
[32:08]
area. So all of those roads are going to
[32:10]
be um done shortly. We hoping that we
[32:12]
can get all of these road done in about
[32:15]
16 months. Hopefully everything will be
[32:16]
done in 16 months and we're going to
[32:18]
start to work on the and we bond $17
[32:21]
million to do that. We're going to start
[32:23]
to work on the next bond hopefully in
[32:25]
about another three or four months. So
[32:26]
when we can actually get everything done
[32:28]
in case we get it done earlier, we just
[32:30]
want to move on to the uh to the other
[32:32]
roads,
[32:33]
» Right?
[32:33]
» Uh phase two that's being done by
[32:35]
sellers and associates. Uh they we just
[32:38]
got received the bids back that was
[32:39]
awarded to Glenn Lelay as well. Those
[32:42]
are some major roads and the reason
[32:44]
they've been haven't started yet is
[32:46]
because like uh north side road is one
[32:48]
of them. That road is used for grinding.
[32:52]
Uh you have Dasput road. Uh we're doing
[32:54]
Tesh Lake um Canal Road. Those big roads
[32:58]
uh some roads that really need some work
[33:00]
addressed. We also have uh project C
[33:03]
that's actually being done by GEC, a
[33:05]
company called GEC. They have a lot of
[33:06]
roads,
[33:07]
» A lot of roads in project.
[33:08]
» Yeah, we have 30, like I said, 33 roads
[33:10]
that we we have already awarded out for
[33:13]
construction. Uh they doing a bunch of
[33:15]
roads. All you know, Leon Landry Road,
[33:17]
Josh Sige, Nelson Canel Road, a bunch of
[33:20]
roads that's actually being done. And
[33:22]
this is $17 million worth of roads.
[33:25]
We're going to bond out later for
[33:26]
another $17 million worth of roads. And
[33:29]
that that'll be around 34 million. But
[33:31]
let me make you understand that's not
[33:32]
going to come out of the repairs,
[33:33]
» Right?
[33:34]
» We needed 30 when I was a councilman uh
[33:37]
when we did an evaluation. I think we
[33:38]
needed 34 36 million worth of road
[33:41]
repair,
[33:42]
» You know, 15 years ago. Uh but we we got
[33:46]
a good start going. But we have also
[33:48]
identified and the council uh we we got
[33:51]
this tiff district that we created in
[33:52]
our area parish where some of the roads
[33:54]
that we're going to be doing we will not
[33:57]
or may not need to use funds from the
[33:59]
from the road tax.
[34:00]
» So we created some things that's
[34:02]
actually going to try to put this parish
[34:03]
in a position to where they're going to
[34:04]
receive money
[34:07]
» Funds for quite some time.
[34:08]
» Such an important part of infrastructure
[34:10]
de development and economic development
[34:12]
and community development is very
[34:13]
important to the citizens. So, we've
[34:15]
seen some major roads uh uh complete
[34:18]
here just recently. Tell us a little bit
[34:21]
about the South Lewis Street project.
[34:23]
» I think that might have been Warren
[34:24]
doing that one. Uh that's uh that's a
[34:27]
that's a road in Warren district that we
[34:29]
have been Councilman Warren Goshan that
[34:31]
we have been working on for quite some
[34:33]
time. Uh that road is actually complete.
[34:36]
We have completed that road. Uh it was a
[34:39]
major deal for Iberia Parish. It took
[34:41]
quite some time to get it done. Um, and
[34:44]
we were able to do that road, not using
[34:46]
Roth from money from that tax. We were
[34:48]
able to do that from the TIFF dollars.
[34:50]
So, it's a big deal for us. Uh, we now
[34:52]
we got real money coming into TIFF, you
[34:54]
know, because we have a lot of
[34:55]
development, a lot of big businesses.
[34:57]
Uh, that's in the tiff area
[34:59]
» And that construction is complete.
[35:01]
» That is complete.
[35:02]
» Absolutely. All right. We're going to
[35:03]
talk about a few other ones here and uh
[35:05]
they're they're all going to connect
[35:06]
through, but let's just talk a little
[35:07]
bit about uh ones that have recently
[35:09]
been completed. How about Innovation
[35:11]
Boulevard?
[35:12]
» Yeah. Innovation Boulevard is a project
[35:14]
that we started many years ago. Fin was
[35:16]
the engineering company on that and that
[35:19]
project was done by Glenn Leger. I
[35:21]
caught a lot of problems from that road
[35:23]
when that road was designed. I mean,
[35:24]
people told me I built a road to
[35:26]
nowhere. You know, you just bu spending
[35:28]
this money. We don't have any money for
[35:30]
roads. And you're right, we didn't have
[35:31]
any road dollars, but we were able to
[35:33]
get federal dollars, state dollars, and
[35:35]
we're able to do what we what we did.
[35:37]
But that is a a man a main hookup for
[35:41]
what we what you're getting ready to see
[35:43]
uh what we're doing in Iberia Parish.
[35:45]
» I call that piece number one.
[35:46]
» That is number one. So that's a big deal
[35:48]
for Iberia Parish and that is totally
[35:51]
completed.
[35:52]
» That one's complete.
[35:53]
» Complete. We also did one right on the
[35:55]
side of that called um uh access.
[35:57]
» Access way.
[35:58]
» That'll be part of the new road when
[36:00]
it's all done, too. Okay. So, that's
[36:01]
piece number one of of of this little
[36:04]
roadway that we're going to be talking
[36:05]
about here. Second is Corporate Drive
[36:07]
Roundabout. So, Corporate Drive, let's
[36:08]
talk about Corporate Drive and Corporate
[36:10]
Drive Roundabout.
[36:11]
» Corporate Drive is on Highway 3212. We
[36:13]
actually change the name to Corporate
[36:15]
Drive. Uh we have a lot of businesses
[36:16]
coming here and we needed something to
[36:19]
reflect that. The roundabout at Corp
[36:22]
Drive is is actually what is is going to
[36:24]
connect with the other piece that we'll
[36:26]
talk about a little bit later. But you
[36:28]
can look at car at the at the picture
[36:29]
here and it's going to show a spur. That
[36:32]
spur wasn't done accidentally. We're
[36:34]
going to take that spur and it's going
[36:36]
to go along the airport property all the
[36:38]
way to Highway 88.
[36:39]
» That's going to open up the whole west
[36:40]
side.
[36:40]
» The whole west side of the airport.
[36:42]
That's a big deal that we're doing.
[36:43]
We're going to do it in phases. Uh I
[36:45]
have have it in Capital Outlay right
[36:47]
now. We're going to do it in phases. The
[36:48]
first phase is going to be the
[36:49]
roundabout and a portion of the road
[36:51]
from Highway 88. The second phase is
[36:54]
going to start from that spur and is
[36:56]
going to go to near near the Seaway, I
[36:58]
guess, and then we're going to connect
[36:59]
later. That's a big deal for us at that
[37:02]
airport. We have a we have some prime
[37:03]
property and you know uh when I ran for
[37:06]
office I talked about it a lot. You know
[37:07]
that's um it's a jewel and you just have
[37:10]
to actually polish it a little bit.
[37:11]
» A big a big focus on the airport area.
[37:13]
We're going to continue to talk about
[37:14]
that. Kadana Regional Airport is
[37:16]
certainly a huge economic asset for our
[37:18]
parish and looking forward to continue
[37:20]
to talk about that as we go. All right.
[37:22]
So that's piece number two.
[37:23]
» Yes.
[37:24]
» All right. So here's piece number three.
[37:25]
This is a a project that we that that
[37:28]
maybe a lot of people don't know about
[37:30]
and that's the highway 675 Jefferson
[37:32]
Island Road roundabout. Let's talk about
[37:33]
that.
[37:34]
» That project we've been working on for
[37:36]
many many years. Actually, we started it
[37:38]
through Iberia Parish and then we turned
[37:39]
it over to the Department of
[37:41]
Transportation. The engineering company
[37:42]
that designed that is Fence the Maker
[37:45]
and
[37:46]
675 Jefferson Island Road is going to
[37:49]
actually connect to the first thing we
[37:51]
talked about which is Innovation
[37:52]
Boulevard, the road that I built to
[37:54]
nowhere. So that's going to connect. So
[37:56]
there's going to be a roundabout coming
[37:58]
off of Highway 90. Uh that's going to
[38:00]
actually connect to Innovation
[38:02]
Boulevard, which is going to go to the
[38:04]
roundabout that we have on Corporate
[38:05]
Drive that's going to go down Corporate
[38:08]
Drive. And you're going to hear what
[38:09]
we're doing later on to bring you into
[38:12]
the airport. What we're trying to do
[38:14]
hopefully at some point in time, the
[38:16]
airport that we have become a
[38:18]
international cargo facility. I I feel
[38:20]
we wasted our time trying to compete uh
[38:23]
with airports like Lafayette, trying to
[38:24]
be commercial, this that and the other.
[38:25]
We're not that. We need to understand
[38:27]
who we are and move forward with it.
[38:29]
I've been talking about it for a year. I
[38:31]
think we have some people starting to to
[38:33]
accept it and um and and we're going to
[38:36]
move forward with that. But Highway 675
[38:39]
675 roundabout was the last piece. It
[38:42]
was the bid went out. It was awarded uh
[38:44]
to I'm not I'm not exactly sure who DOTD
[38:46]
awarded to. I think I know, but I'm not
[38:48]
going to say it. and they already
[38:50]
started putting the flags out. So, you
[38:51]
should see equipment there in February.
[38:53]
» Saw the stakes out there this morning.
[38:54]
Looks great.
[38:55]
» Yeah.
[38:55]
» One other thing about this particular
[38:56]
project that I want to make sure that we
[38:58]
bring [clears throat] up. You know,
[38:58]
we're talking about connections and
[39:00]
things like that. This project is going
[39:02]
to go a long way toward making that
[39:03]
particular area much safer for traffic.
[39:05]
There's been some recent accidents
[39:07]
there. This is going to make it a lot
[39:08]
safer.
[39:09]
» Yeah, absolutely. you know, when you're
[39:11]
just coming uh when you're trying to
[39:13]
cross, if you're coming from under the
[39:14]
overpass and you're trying to turn left
[39:16]
in front of Landre, it's terrible. And
[39:19]
right now, we have all these trucks uh
[39:21]
that's gone to to the big business at
[39:23]
the air base right now and they trying
[39:25]
to cross. It's it's a terrible
[39:27]
situation. And I hope we don't have a
[39:28]
whole lot of accidents before this thing
[39:30]
is completed.
[39:31]
» So this So these three So this is
[39:32]
project number three. So, these three
[39:34]
pieces of this project are going to
[39:36]
connect are going to help connect uh one
[39:39]
of two huge economic assets as I
[39:42]
mentioned before [clears throat] uh to
[39:43]
highway 90 and that's that's the
[39:45]
Acadiana Regional Airport. Let's talk
[39:47]
just a bit about what's going on at
[39:48]
Aadiana Regional Airport.
[39:49]
» The Kadana Regional Airport is is owned
[39:51]
by Bria Paris government. Uh it's used
[39:54]
to actually do training for uh like
[39:58]
NASA, the Navy, the Air Force. They do a
[40:01]
lot of training there, touchdown
[40:03]
training, crosscountry training. Uh the
[40:05]
airport u we have some 1,200 acres over
[40:07]
there um at the airport that we can
[40:10]
actually use and lease bring businesses
[40:12]
there and lease and make real money off
[40:14]
of it. Uh as long as you're dealing with
[40:16]
uh businesses as pertaining to uh
[40:19]
aviation for the most part, you can't
[40:21]
you have you have certain areas where
[40:22]
you can do certain things, but for the
[40:24]
most part, you really have to be dealing
[40:26]
with the um with with businesses in the
[40:28]
aviation business. Uh, we have an
[40:30]
unbelievable runway and taxi way.
[40:33]
» 8,0002 feet.
[40:34]
» 8,0002 feet. And that two feet mean a
[40:36]
lot. It does.
[40:38]
» Seriously, because it make us two feet
[40:41]
longer than the than the next one.
[40:43]
» Absolutely right.
[40:44]
» It means a lot. So, we uh at that
[40:46]
airport, we can, you know, we can land
[40:48]
almost anything there. So, we have a lot
[40:50]
going on there. And you're going to hear
[40:52]
later some of the things that we have
[40:53]
going.
[40:53]
» Yeah, they're doing a great job out
[40:54]
there. and um you know uh connecting the
[40:56]
airport uh with those previous road
[40:59]
projects that we were talking about to
[41:00]
the highway uh you know when the Navy
[41:02]
left u uh that was before the fourlane
[41:04]
was built back in the day and these
[41:06]
connections are helping us to connect
[41:08]
Aadiana Regional Airport into the into
[41:10]
the highway. Um I'm looking at the next
[41:12]
photo here and I'm just going to go
[41:14]
ahead and put that there. This is where
[41:15]
it all started. Who is that guy on the
[41:16]
left? I don't know who that is. So uh so
[41:19]
» Oh Mike, that's uh that's a couple of
[41:21]
months after I got elected.
[41:22]
» Yeah. So, this was this was uh this was
[41:24]
where all a lot of these discussions
[41:26]
began. Um I remember going and talked to
[41:28]
talking to some pretty bigname
[41:30]
businesses about what they needed to see
[41:32]
at our airport in order to make it. It's
[41:34]
already an attractive airport and they
[41:35]
agreed with that. But what did it what
[41:37]
was it going to take? What kind of
[41:38]
improvements did we need to make? And
[41:39]
[clears throat] this was where it all
[41:40]
started. Tell us a little bit about I'm
[41:42]
reminiscing now, but I can remember
[41:44]
right after I got it like that. I went
[41:45]
to your office and I'm like, why did we
[41:48]
why did we lose the FedEx deal? Why did
[41:50]
we lose it? Why did we do this? And Mike
[41:52]
was like, "Larry, uh, I don't really
[41:54]
have a direct answer for you, but we got
[41:56]
to do something." I said, 'Well, we need
[41:57]
to go to FedEx. And this was in January.
[41:59]
I just got elected, took office in
[42:01]
January.
[42:02]
» And, um, so we scheduled a flight, met
[42:05]
with FedEx in February. Uh, we met with
[42:08]
the executives at FedEx, and we, um,
[42:10]
[clears throat] found out what it took
[42:12]
to get a company like FedEx over here. I
[42:15]
remember in the meeting they was talking
[42:16]
about STEM time and I was and I was
[42:18]
trying to be, you know, like I got all
[42:20]
this figured out. STEM time. Now, what
[42:22]
in the world is
[42:23]
» STEM time is the the amount of time it
[42:25]
takes to bring uh goods and and items
[42:28]
from its first point to its end point,
[42:30]
» Right? And that was like $50,000 a
[42:33]
minute.
[42:34]
» For every minute took, it cost them
[42:36]
$50,000. So what happened is when they
[42:39]
did the evaluation from the airport in
[42:41]
Lafayette to our airport, we were like
[42:44]
60 six minutes over. That's $300,000.
[42:48]
And they had taken another route on 182,
[42:50]
but it was so bad they didn't even tell
[42:52]
us how many minutes it was. So that
[42:53]
helped out a whole lot early on. So then
[42:55]
we realized that now we got to figure
[42:58]
out what we can do to get these uh
[43:00]
trucks to the airport quicker. So then
[43:03]
we came up with roundabouts. And we have
[43:05]
this thing that we do called the road
[43:07]
show with DOTD and all it was brought up
[43:10]
to DOT um and made it kind of urgent and
[43:14]
next thing you know we have a roundabout
[43:15]
there. But the whole re the reason for
[43:17]
this here is to have access on both ends
[43:20]
to that airport from 88 and also 675. So
[43:23]
that was a big deal. Uh I can remember
[43:26]
um I remember that meeting very well.
[43:28]
» And so if I'm not mistaken, we brought
[43:30]
some king cake.
[43:31]
» We sure did. We sure did. That was it
[43:33]
was hard to pack that in my luggage in
[43:34]
the overhead compartment, but we got it
[43:36]
there.
[43:36]
» Actually, I think I might have had it
[43:37]
FedEx though. I think that's what you
[43:39]
think. Yeah,
[43:40]
» Good thinking, right? So, uh, so anyway,
[43:43]
so at that meeting, we learned about the
[43:44]
road connections, the importance of road
[43:46]
connections, the, you know, the fact
[43:47]
that 18 wheelers don't like 90 degree
[43:49]
turns and we've got to put in these
[43:51]
industrial roundabouts to get trucks in
[43:52]
and out. That was where it all started
[43:54]
and and that was the the purpose the
[43:56]
purpose for that. But because that
[43:58]
infrastructure is put in, you mentioned
[43:59]
all of these 18-wheelers and things that
[44:01]
are now uh going to be coming through
[44:03]
that bring you know flat fast forward a
[44:06]
few years and that brings us to the
[44:08]
first solar project which is which you
[44:10]
know was a big part of all of that not
[44:12]
then but has resulted in that now right
[44:14]
tell us a little bit about that one. the
[44:16]
first solo project. You know, I'm a very
[44:18]
religious man. I'll say it was a godsend
[44:19]
because it's the biggest project in the
[44:22]
history of our parish that they came
[44:25]
here and we talked about them. I
[44:27]
remember the morning I received a phone
[44:29]
call and I was supposed to be going to
[44:30]
Lake Charles and I called you at your
[44:32]
office and I said, "Mike, someone is
[44:34]
calling saying it was actually uh Carmen
[44:37]
Carmen is calling and saying that um we
[44:39]
have a a a mill a billion dollar uh
[44:42]
chance to get a business here." And I'm
[44:44]
like, a billion dollars any Okay, great.
[44:47]
So, I canceled a meeting in in Lake
[44:49]
Charles and we met at your place and
[44:51]
make a long story short, they came down
[44:53]
and they looked at this cane field. I
[44:56]
mean, it was nothing but cane and they
[44:57]
we we sold them on that. This is a $1.1
[45:00]
billion facility that was built uh in
[45:04]
that cane field. 2.4
[45:07]
million square feet on the roof, one
[45:09]
roof facility. That's like nine times
[45:12]
the size of the Superdome. Um, we have
[45:16]
right now 832
[45:18]
employees working right there right now.
[45:20]
The annual payroll alone is $75 million.
[45:24]
This is a big deal for us. It's so big.
[45:27]
It's like the warehouse that they built
[45:30]
that's 560,000
[45:32]
square feet. That's more than two times
[45:34]
the size of the Superdome. No one talk
[45:36]
about it,
[45:36]
» Right? You know, um, it's it's a lot.
[45:39]
They brought a lot to Iberia Parish.
[45:41]
They definitely stimulated what's going
[45:43]
on in in in Iberia Parish in
[45:46]
particularly around that uh airport
[45:48]
area.
[45:48]
» So between uh parish government, the
[45:50]
airport authority, Iberia economic
[45:52]
development authority, Louisiana
[45:53]
economic development, all the partners
[45:55]
came to the table to make that happen.
[45:56]
We had to pull out all the stops. There
[45:58]
was some pretty advanced economic
[45:59]
development things happening with all
[46:00]
the uh with all the partners.
[46:02]
» This is a big deal because it's not only
[46:04]
a big deal for Iberia Paris, it's a big
[46:05]
deal for IDA. IDA our very economic
[46:09]
development authority didn't have a
[46:10]
nickel
[46:10]
» Right
[46:11]
» And we have an authority that we trying
[46:13]
to bring bring businesses here but you
[46:15]
have no money at all coming in to manage
[46:17]
it so you you're the CEO of that but now
[46:20]
Mike you have money that you are
[46:22]
starting to receive right now uh because
[46:24]
you actually manage the property at for
[46:26]
solar
[46:27]
» That we can invest right back in
[46:28]
economic development of course you know
[46:29]
when I when I when I mentioned parish
[46:31]
government I think about it as a as a
[46:32]
whole unit but the parish council very
[46:34]
much involved in that have been a big
[46:37]
partners with that. We very much
[46:38]
appreciate.
[46:38]
» Yeah, the parish council is is honestly
[46:41]
the backbone to everything that's
[46:42]
getting done in our area parish. Uh
[46:45]
look, we all come up with ideas. I come
[46:46]
up with ideas, parish council members
[46:48]
come up with ideas and we try to work it
[46:50]
together to make it to make it work, but
[46:52]
first soul is strategically located um
[46:55]
in you know the at the airport and it's
[46:57]
it's you know the infrastructure, the
[47:00]
investments, the the economic impact
[47:02]
that is bringing into Iberia Parish. Our
[47:05]
tiff district was up in December by some
[47:08]
463%.
[47:10]
» 400 and over 400% increase. Wow.
[47:13]
» Right. You know, so just last month by
[47:17]
our from our tiff district, we received
[47:19]
$3.1 million.
[47:20]
» That's spectacular,
[47:21]
» Right? So we we got a lot of great
[47:23]
things going on and we have figured out
[47:25]
how we can manage this business lack of
[47:27]
business that it is and uh put it in a
[47:30]
position to where the quality of life
[47:31]
for the people here is going to be good.
[47:33]
Speaking of quality of life, the average
[47:36]
salary at First Solar is $90,000 a year.
[47:38]
» Wow.
[47:39]
» Wow. That's that's that's tremendously
[47:41]
more than the median income and it's
[47:42]
going to be great for our citizens.
[47:43]
That's a great great thing. So, we're
[47:45]
talking about we talked about First
[47:46]
Solar. Uh there are other projects that
[47:48]
are going out there that are huge. You
[47:50]
know, you mentioned before, Mr.
[47:51]
President, that we're an oil and gas
[47:53]
parish and an agriculture parish. We
[47:55]
always will be. We're very proud of
[47:56]
that. Absolutely. It's part of our
[47:57]
heritage and it provides a lot of great
[47:59]
jobs for our area. But these projects
[48:01]
are diversifying our economy and uh
[48:03]
helping us to continue to round out what
[48:05]
we offer. Really making the term made
[48:07]
Niberia Parish great again, right? I'm a
[48:10]
borrow but uh but you know really really
[48:13]
good things. And so as we move for on
[48:14]
from first solar let's talk about
[48:16]
another big project that we've heard
[48:17]
about recently and that's the UL
[48:19]
Newberry Research Center. The two phases
[48:21]
of a pretty big pharmaceutical project.
[48:23]
» That's a big facility. That's a
[48:25]
state-of-the-art facility. Um and we
[48:28]
needed that level of safety. Three, what
[48:30]
a lot of people don't realize is when
[48:32]
COVID hit right here at our research
[48:34]
center for Fizer, we actually research
[48:38]
and develop that particular drug right
[48:40]
here. And when the president used to get
[48:42]
on on television and say we could have
[48:45]
had this done 30 days earlier, 40 days
[48:47]
earlier. He wasn't kidding because we
[48:49]
didn't have a level 63 uh facility to
[48:52]
complete it. We had to send it off. And
[48:54]
uh with this level safety 3 facility
[48:56]
that's going to be sent that's actually
[48:58]
being built right now is going to put us
[49:00]
in an unbelievable position because now
[49:02]
we can do the research and development
[49:05]
» And later on we'll tell you what else
[49:06]
» Right and that the dirt's flying out
[49:08]
there right now. If you drive by the
[49:09]
research center you can see all of the
[49:10]
excavators and the dirt flying and
[49:12]
things like that. So this project is out
[49:14]
of the starting gates. You know this is
[49:16]
going to be huge for our area. It's
[49:17]
going to provide some great
[49:18]
opportunities for us to expand into
[49:20]
pharmaceuticals.
[49:22]
This is phase one
[49:23]
» Right? Uh phase two, which we're gonna
[49:25]
about to talk about here in just a
[49:26]
second, is really going to bring a whole
[49:29]
new diversified sector to our economy
[49:32]
and that's going to be happening at
[49:33]
Progress Point Business Park. You could
[49:35]
see the on the picture you can see UL
[49:37]
Lafayette's phase two, which will be
[49:39]
building a pretty significant
[49:40]
pharmaceutical manufacturing facility.
[49:42]
Let's talk about that.
[49:43]
» Right. Um progress point is something
[49:45]
that you and I seem like we've talked
[49:47]
about it so much over the years.
[49:49]
» It's right on Innovation Boulevard.
[49:50]
» So, and it is on Innovation Boulevard.
[49:52]
So when I built that road to nowhere,
[49:54]
that's what was going to be there. Um
[49:57]
it's
[49:58]
it's going to be by time we put all of
[50:01]
this together when you're talking about
[50:02]
what's the businesses that's going to be
[50:04]
at progress point uh dealing with
[50:06]
pharmaceutical, dealing with
[50:08]
» Security.
[50:09]
» Yeah. Go ahead. Defense, defense,
[50:10]
manufacturing, and others.
[50:12]
» We're we're going to see a you're going
[50:14]
to see Iberia Parish really grow. When
[50:16]
you're talking about the jobs at the
[50:18]
innovation center alone, you're talking
[50:20]
$130,000 a year average salary. So
[50:23]
you're talking big jobs. You're talking
[50:24]
many employees and big money. So we are
[50:28]
diversifying what's taking place.
[50:29]
» Estimates are 400 plus jobs somewhere in
[50:31]
that net.
[50:32]
» Yeah. So we are diversifying what's
[50:33]
happening in our parish. But I can tell
[50:35]
you uh when I was running for office,
[50:37]
people was telling me that we needed to
[50:40]
figure out a way how to keep people in
[50:42]
our parish. and and of course we again
[50:45]
we have agriculture and we have oil and
[50:47]
gas but now we have diversified into
[50:49]
manufacturing we're doing the panels we
[50:52]
doing the pellets we we going to be
[50:54]
doing the pharmaceutical we we got some
[50:56]
things that we have in our barrier
[50:57]
parish aviation the airport we're doing
[51:00]
flight training we're going to have all
[51:01]
kind of great things going on
[51:02]
business-wise in in our parish so we we
[51:06]
have divers diversified what we doing
[51:08]
here and it's all about parish growth
[51:10]
and the revenue that we're going to
[51:11]
receive in the future from those uh
[51:13]
those things. Pro uh progress point
[51:15]
Mike, I know that's your babe. I know
[51:17]
you've been working with that. I'm so
[51:18]
glad to see that we actually have a
[51:20]
drawing, a rendering. Uh we actually
[51:23]
have money now that we can actually
[51:24]
start to build the roads. Now, Berry
[51:26]
Parish government, the council is aware.
[51:29]
So, um uh we're going to be using monies
[51:32]
from the tiff to help you do some of the
[51:34]
things that you need to do.
[51:35]
» And this is going to be great. This
[51:36]
could be great for for economic growth
[51:38]
long term.
[51:38]
» That's what it's all about. It's all
[51:39]
about infrastructure. If you can bring
[51:41]
the infrastructure, you can get the
[51:43]
businesses and we have done a lot of
[51:44]
infrastructure work.
[51:45]
» So, we've talked quite a bit about the
[51:46]
focus on the airport area, which is so
[51:49]
great. Uh, the Aadiana Regional Airport,
[51:51]
the the investment that's been made
[51:52]
there and infrastructure and the
[51:54]
resulting businesses that have come and
[51:57]
are coming. Um, let's shift a little bit
[51:59]
if we could uh to Iberia Parish's other
[52:02]
huge economic driver and huge economic
[52:05]
asset. That's what that's what uh we all
[52:07]
love as the Port of Iberia. Those guys
[52:09]
are doing a great job.
[52:10]
» Yeah, the port of Iberia is doing
[52:12]
fantastic. I mean, Craig uh Romero is
[52:14]
the um the director at the port. His
[52:17]
commission, they're doing a fantastic
[52:18]
job. The port have about 2,000 acres of
[52:21]
industrial and and maritime um service.
[52:25]
They doing a fantastic job bringing
[52:27]
businesses here, lots of revenue. Uh
[52:30]
when I started to put this together for
[52:33]
uh the state of the parish, I ended up
[52:36]
speaking to Dr. Lauren Scott to try to
[52:38]
get some information about what's going
[52:40]
on at the port. And we have
[52:41]
» LSU economist economist ameritus.
[52:44]
» That's right. And we have a lot going on
[52:47]
right now. We we we have everything in
[52:48]
Iberia Parish that we need. We have
[52:50]
water. We have rail. We have we have
[52:52]
everything that we need. [clears throat]
[52:53]
We have um the roads. Uh we we looking
[52:56]
really good. The port is a hub for
[52:58]
what's taking place. I mean, think about
[53:00]
it. You have the port of Iberia, you
[53:02]
have New Orleans, and you have Port
[53:05]
Author,
[53:05]
» Right? We're right in the middle.
[53:06]
» We're directly in the middle. And I
[53:08]
think we on track right now to do some
[53:10]
of the things. They actually did some
[53:11]
dredging. Uh so they I think they did
[53:14]
they dredged all the way to 16 ft. Uh
[53:16]
which is a big deal. So we're going to
[53:18]
have lots of businesses uh coming here.
[53:20]
And if we we don't the port the way it's
[53:24]
set up, I can see in the future where
[53:27]
you can have a little bit more than oil
[53:28]
and gas at that port because the
[53:31]
waterway that you have, you can do some
[53:33]
some great things. We market we market
[53:35]
Iberia Parish as a multimodal parish.
[53:37]
That means that you can bring raw
[53:40]
materials in. You can transport them in
[53:42]
by rail, water, by air, by road, and you
[53:46]
can finish those goods and then send
[53:48]
them back out into the world. Again,
[53:49]
made Niberia Parish things made Niberia
[53:52]
Parish is becoming more and more of a of
[53:53]
a thing, right? Yes. And so we want to
[53:55]
continue to invest in the idea that you
[53:57]
can that you can move around the parish
[53:59]
in that particular way. And a key
[54:01]
component, we talk about roadway
[54:02]
improvements all across our parish, but
[54:04]
a key uh way of moving those goods and
[54:06]
those services from the port and around
[54:08]
is through road projects at the port.
[54:10]
So, let's just talk about road projects
[54:12]
specifically at the port of Iberia.
[54:14]
» Okay. Um we're trying to to upgrade the
[54:17]
roads at the Port of Iberia. Uh the
[54:20]
director at the port was able to get
[54:21]
some $2.5 million from the state uh to
[54:25]
take care of two roads. There was David
[54:26]
Bayard Road and also Canadian V U Vice.
[54:30]
When we went out for bids, the bid came
[54:33]
back at $5.4 million.
[54:36]
But the way we building these roads at
[54:38]
the port now, we want to build them for
[54:40]
the future
[54:41]
» Uh for the weight that's going to be
[54:43]
actually uh put on those roads. Exactly.
[54:46]
So, the parish council approved, I
[54:48]
think, $2.9 million to uh to finish the
[54:50]
project um to actually get enough money
[54:53]
to do the project. Those two roads are
[54:56]
already engineered uh designed and um
[54:59]
one of them is under construction right
[55:00]
now. It's a big deal for us in our
[55:03]
barrier parish and for the future
[55:05]
expansions that we're going to have
[55:06]
there. We have to start doing things
[55:09]
that's going to have long-term effect.
[55:11]
» Right.
[55:11]
» This thing about spending a million
[55:12]
dollars here and it's going to last for
[55:14]
three years. If you need to spend $5
[55:17]
million, save your money and spend $5
[55:19]
million away can last 20 years.
[55:20]
» Right. Right.
[55:21]
» You know, so um
[55:23]
» That's where we're at with the port. the
[55:24]
port is doing great,
[55:25]
» Right? Absolutely. These investments in
[55:27]
infrastructure are continuing to pay off
[55:29]
and um we've heard, you know, and it's
[55:31]
really getting the attention of some
[55:33]
pretty major businesses that have
[55:35]
decided to locate at the port. Let's
[55:37]
talk about one that uh we recently
[55:39]
attended the uh ribbon cutting forum and
[55:41]
that's Cinjun industries. Huge win for
[55:44]
» Is they're set up at the port. They
[55:45]
operate and they're doing very very
[55:47]
well. They're going to bring around 600
[55:48]
new jobs. This is a big deal for the
[55:51]
port of Liberia, for Iberia Paris in
[55:53]
general. They going to be hiring, like I
[55:55]
said, 600 um jobs, skilled trade,
[55:59]
regular, good, hard working men. And we
[56:03]
certainly have that in Iberia Parish. Um
[56:05]
what they do, uh they're going to be
[56:07]
building big fabrication jobs and this
[56:10]
is going to be going all over the place.
[56:11]
And the reason they picked Iberia
[56:12]
Parish, of course, is because of the
[56:14]
workforce. We have an unbelievable
[56:16]
workforce here at Iberia Parish and
[56:17]
surrounding area
[56:18]
» And those infrastructure improvements
[56:19]
you talked about as well. So, Kinjun
[56:21]
Industries, and by the way, thanks to
[56:22]
Cinjun Industries for their investment
[56:23]
in Iberia Parish is very much
[56:25]
appreciated, of course. Um, also, we've
[56:27]
heard another one that's uh just just
[56:30]
hot off the press almost, and that's
[56:31]
Louisiana Concrete Products. What are
[56:33]
they doing out of
[56:34]
» That's a that's a big deal. Uh, they
[56:36]
doing pre-cast. They pre-casting u
[56:39]
materials that they can send all over uh
[56:41]
the place for um you know, marine
[56:43]
industry or whatever. That's 300 jobs
[56:46]
that they bringing there at at um
[56:49]
Louisiana Concrete Products. That's a
[56:50]
big deal for us. So, it's strengthening
[56:52]
us. It's definitely putting us in this
[56:54]
position to where we're known as the
[56:57]
hub. Uh and it's a big deal for Iberia
[57:00]
Parishes. When you're talking
[57:01]
fabrication,
[57:03]
people should start talking about the
[57:04]
Port of Iberia.
[57:05]
» You hear about all the construction
[57:06]
going on along the South Louisiana uh
[57:08]
coast. You hear about the big
[57:09]
construction projects happening in the
[57:11]
New Orleans area, the LNG projects in
[57:13]
the Lake Charles area, the Port of
[57:15]
Iberia and Iberia Parish is a key
[57:17]
component to all of those things. A lot
[57:18]
of those pre-cast things you were
[57:19]
talking about will end up in those
[57:21]
projects.
[57:21]
» Exactly. Right. They actually dealing
[57:23]
with the LG. So we they're being
[57:25]
fabricated here at the port and they're
[57:27]
being shipped.
[57:28]
» So when you see when you see those big
[57:29]
things happening [clears throat] in
[57:30]
those smile because most of it was again
[57:32]
made in that area
[57:33]
» Made in that area parish. And that's and
[57:34]
look, we're [clears throat] doing well.
[57:36]
I mean the the um the the port they
[57:40]
doing extremely well.
[57:41]
» Absolutely. Absolutely. So, you know,
[57:43]
there's a lot of things that people
[57:44]
don't maybe don't know about the
[57:46]
wonderful things going on in Iberia Par
[57:47]
staying, you know, staying in the port
[57:49]
lane for just a moment. Um you know,
[57:51]
I've been to a lot of christenings and
[57:52]
you you know, you hear about christening
[57:54]
boats and christening babies
[57:56]
[clears throat] and things like that,
[57:57]
but I didn't know you could christen a a
[57:58]
crane, but recently
[58:00]
» We went out to a crane christening. So,
[58:02]
tell us a little bit about one of the
[58:03]
biggest cranes in Yeah, they're one of
[58:05]
the biggest uh cranes in North America
[58:06]
right here at the port.
[58:07]
» Yes, the it's a state-of-the-art crane.
[58:09]
Um it's it's a very big deal. Uh it's
[58:12]
it's a it's 75 ft tall. It's got a reach
[58:15]
of 125 ft. It's picking up 52 tons. It's
[58:19]
a big deal for Iberia Parish. It was a
[58:21]
$6 million investment um at the port and
[58:25]
they doing great things. and and our
[58:27]
name port of Aberia Aberia Parish is on
[58:30]
this deal with the biggest crane right
[58:33]
» Around that's we got some history making
[58:35]
things that you can be proud of.
[58:37]
Absolutely right. So we we talked a bit
[58:39]
about infrastructure. We talked a bit
[58:40]
about the businesses locating. Um let's
[58:43]
talk a little bit about how the port of
[58:44]
Iberia is creating uh infrastructure for
[58:47]
future growth. We were recently um uh
[58:49]
part of the what's called the Millennium
[58:52]
Expansion groundbreaking. Tell us a
[58:53]
little bit about that.
[58:54]
» That's a big deal for the port. It's 90
[58:56]
acres of property that's going to have
[58:58]
50 acres of of waterfront. That's a
[59:01]
that's a big deal. Basically, what uh
[59:03]
Craig and his and his members are trying
[59:04]
to do is design [clears throat]
[59:05]
something to where we can bring new
[59:07]
tenants to Iberia Parish and it's a big
[59:09]
deal. The Millennium
[59:11]
project is is huge for the port. And
[59:14]
again, I can't say enough about the Port
[59:16]
of Iberia. They're doing a great job.
[59:17]
They really have a lot of businesses
[59:18]
going there. They're bringing some
[59:20]
serious revenue. They have a lot of
[59:21]
employees working at that port. That's
[59:23]
what we need. We need to get the
[59:24]
employees working here and get this the
[59:27]
economy is doing well in Iberia Parish
[59:29]
right now. I I would like to see it do
[59:31]
better, but we're doing very well.
[59:33]
» You know, it's all about ready sites,
[59:35]
right? Businesses want sites that are
[59:36]
ready ready to go. I mean, they you
[59:38]
know, businesses can't wait. If the if
[59:40]
the sites aren't available and they
[59:42]
aren't hooked up and there's not the
[59:43]
right infrastructure, the right
[59:45]
channels, the right the right sites for
[59:47]
them to develop now, then they'll just
[59:48]
move on.
[59:50]
continuing to invest in infrastructure
[59:52]
uh you know with parish government with
[59:54]
the port of Iberia with the airport with
[59:55]
IEDA um is really making those sites
[59:58]
ready and ready for new business.
[59:59]
» Yeah, I think the the Millennium was a
[1:00:01]
major is a is a great deal see the port
[1:00:03]
is planning ahead for them.
[1:00:06]
» Okay, so moving on from uh from the Port
[1:00:08]
of Iberia um but staying on
[1:00:10]
infrastructure you know whether it's
[1:00:12]
business or residents um you know
[1:00:15]
quality of living and we're going to
[1:00:16]
talk about that just just a little bit.
[1:00:18]
so important for folks to have clean
[1:00:21]
water utilities and things like that.
[1:00:23]
We've got a great uh waterworks
[1:00:25]
district. Tell us a little bit about
[1:00:26]
what's happening at Waterworks District.
[1:00:27]
» Waterworks district number three, what
[1:00:29]
they do is they ensure the safe and
[1:00:32]
efficient u potable water for the people
[1:00:34]
of our Paris, the residents that they
[1:00:36]
supply to. Uh they have to follow the um
[1:00:40]
Department of Health guidelines and they
[1:00:42]
do that very very well. They have a
[1:00:44]
director that's actually taking care of
[1:00:45]
water and sewer for us. That's Brad
[1:00:47]
Crater. Uh that system produces about
[1:00:49]
1.5 million um gallons daily and they
[1:00:53]
have about 2900 uh customers that they
[1:00:56]
serve and it's about 150 miles of water
[1:00:59]
line that they're dealing with on a
[1:01:00]
daily basis. So they have a lot of stuff
[1:01:02]
going on and uh I can tell you the
[1:01:04]
waterworks the waterwork u facility that
[1:01:08]
we have right now we've made some major
[1:01:11]
major improvements in that facility. So,
[1:01:13]
» Well, this is about bringing water in,
[1:01:15]
right? And so, I know those guys are
[1:01:17]
always working hard on improving the
[1:01:19]
infrastructure. Let's talk just a little
[1:01:20]
bit about some of the infrastructure
[1:01:22]
improvements on bringing water in
[1:01:23]
through waterworks district.
[1:01:24]
» We've done a lot. Uh we have um 2
[1:01:26]
million gallons per day water plant that
[1:01:28]
we did at the Kadana Regional Airport.
[1:01:30]
Uh that's for the of course it's for the
[1:01:33]
airport, but we're trying to get a
[1:01:35]
little bit more industry and commercial
[1:01:37]
customers out there. They took care of
[1:01:38]
that. They have 1,400
[1:01:40]
gallon um per day water well, 5,000galon
[1:01:44]
storage tank system that they have. They
[1:01:47]
upgraded the existing water plant. Uh
[1:01:49]
they've done a lot of work over there.
[1:01:51]
They have got about 43,000
[1:01:53]
um feet of water man that they have
[1:01:56]
actually done since 2016. So I can tell
[1:01:59]
you they have very very busy and and
[1:02:02]
they doing a great job for our barrier.
[1:02:03]
» So that's taking the water in. Well,
[1:02:05]
when you take the water in, you got to
[1:02:06]
take it out again. We got the same man
[1:02:08]
doing that too.
[1:02:08]
» Yeah. Let's talk a little bit about
[1:02:09]
sewage sewage district.
[1:02:11]
» So he actually to take the water in now
[1:02:12]
you got to let it out right. So he
[1:02:14]
ensures the safety of our parish
[1:02:16]
residents. Um again he got to follow the
[1:02:18]
guidelines of um the department of energ
[1:02:21]
uh environmental quality and also um the
[1:02:24]
EPA. Uh he have a little bit over 80
[1:02:26]
miles of um sewer lines that he's
[1:02:29]
managing with 3500 residents and
[1:02:32]
commercial customers. It's a big deal.
[1:02:34]
It was a big job. is a lot of staying on
[1:02:36]
top of everything. And uh I'm going to
[1:02:39]
be honest with you. Um for me it it's so
[1:02:43]
much easier today because I throw it all
[1:02:44]
on Brad now. So he just called
[1:02:46]
» I think goes home.
[1:02:48]
» I don't I don't think the man sleeps to
[1:02:49]
be frank with you, but he's doing a
[1:02:50]
fantastic job.
[1:02:51]
» Sure. Absolutely. So just like on the
[1:02:53]
water side where they're constantly
[1:02:54]
doing infrastructure uh improvements.
[1:02:56]
Tell us a little bit about the sewer
[1:02:57]
infrastructure improvements that are
[1:02:59]
going on right now.
[1:02:59]
» Well, they uh they put in an 18inch
[1:03:03]
force man. that's really uh that's doing
[1:03:05]
a great job at the lift station. Uh I
[1:03:08]
can remember he did some water sector
[1:03:10]
grants in phase one if I'm not mistaken.
[1:03:13]
Uh he added 12 permanent generators. I
[1:03:15]
think he got four uh uh totable
[1:03:18]
generators that's going to improve the
[1:03:20]
system. In phase two he actually uh
[1:03:22]
rehabilitated some sewer lines and
[1:03:24]
upgrades and those types of things like
[1:03:26]
in Orange Grove and other U areas. We
[1:03:30]
got the big deal that we're working on
[1:03:31]
right now, Mike, is a $60 million sewer
[1:03:34]
plant. Uh we've been working with our
[1:03:36]
congressional and state delegation. It
[1:03:39]
looked like we have $10 million
[1:03:41]
committed from the state so far, $10
[1:03:43]
million committed from the federal
[1:03:44]
government. I've spoken with Congress
[1:03:46]
Congressman Higgins. I've spoken with
[1:03:49]
Senator Cassidy and Kennedy. Uh we got a
[1:03:52]
team that's working with us in
[1:03:53]
Washington DC. And we it's very
[1:03:55]
promising. If we don't get this water
[1:03:59]
waste facility, we're gonna we're going
[1:04:01]
to be in a bind in a few years to come
[1:04:03]
because we're growing and the current
[1:04:05]
facility that we have right now, we
[1:04:07]
actually use it with the city and it's a
[1:04:09]
great deal, but we're going to grow out
[1:04:11]
of that. Um and and the the building the
[1:04:15]
construction that we're doing right now
[1:04:16]
is really a lot of it is in Cotto and
[1:04:19]
you're going to have to run those lines
[1:04:20]
all over the place to get to the city.
[1:04:22]
So, it makes absolutely no sense not to
[1:04:24]
start looking at um a waste water,
[1:04:27]
excuse me, a sewer facility um in the
[1:04:29]
parish
[1:04:30]
» Preparing for future growth and making
[1:04:32]
sure that we can take those all into the
[1:04:34]
system.
[1:04:34]
» And that's going to be a big deal. It's
[1:04:35]
going to be a big facility. It's going
[1:04:36]
to be a three uh milling gallion uh per
[1:04:40]
day facility.
[1:04:41]
» So, we're we're talking about utilities.
[1:04:43]
We're talking about infrastructure. You
[1:04:44]
know people understand when we talk
[1:04:45]
about roads and drainage and uh water
[1:04:48]
and sewer but a another piece of
[1:04:51]
infrastructure which is crucial for
[1:04:54]
[clears throat] commerce and for uh the
[1:04:56]
citizens and for schools and for
[1:04:59]
students uh is fiber to the home and
[1:05:02]
business so very important to our
[1:05:04]
community. Tell us a little bit about
[1:05:05]
what's the status of fiber to the home
[1:05:07]
and business. We partnered with uh
[1:05:08]
Kinjun Engineer uh Kinjun Broadband,
[1:05:11]
excuse me, uh many years ago when we
[1:05:13]
started getting the the dollars, ARPA
[1:05:16]
funds, and uh we were able to do, of
[1:05:18]
course, you already know we have
[1:05:19]
companies uh that's actually have fiber
[1:05:22]
all over Iberia Parish. You have uh
[1:05:25]
AT&T, you have COGS, we've been using
[1:05:27]
Kinjun uh to do some work for us. So
[1:05:30]
far, Cinjun have actually installed over
[1:05:32]
2500 businesses in the Coto area u that
[1:05:35]
have fiber to their home. That's a big
[1:05:37]
deal. Uh we did a groundbreaking last
[1:05:40]
actually in 24 you were there.
[1:05:42]
» We did the groundbreaking. Uh we spent
[1:05:44]
about $5.2 million
[1:05:46]
um grant dollars in in fiber in in in
[1:05:49]
this parish. So we we're doing very
[1:05:51]
well. Um we need cable, excuse me, we
[1:05:54]
need fiber. We're connecting right now.
[1:05:57]
Uh we doing another phase of fiber where
[1:06:00]
we've stopped up in Cotto and now it's
[1:06:03]
running from Cotto all the way to the
[1:06:04]
port of Barbaria on both sides of the
[1:06:06]
highway and also getting some homes
[1:06:10]
along the way.
[1:06:12]
Fiber is critical for businesses that we
[1:06:14]
have because business global these days.
[1:06:17]
Businesses are global these days and you
[1:06:20]
have to have something that you can deal
[1:06:22]
with that you can use that's going to be
[1:06:23]
there for you when you need it. And um
[1:06:27]
and that's what we do. And we have a
[1:06:28]
relationship with all of the different
[1:06:29]
companies that provide it. In fact, I
[1:06:31]
have one of the guys here from AT&T
[1:06:33]
tonight um listening uh we we have a lot
[1:06:36]
of good things going on um
[1:06:38]
» Uh with Fiverr. So, we're doing well.
[1:06:40]
Well, I just want to let folks know if
[1:06:41]
you see this weird looking machine
[1:06:42]
around, you know, it's it's putting in
[1:06:44]
something that's very important to our
[1:06:46]
community. We get questions, what is
[1:06:47]
that thing? And so, it's this is the
[1:06:48]
bore machine that helps put those that
[1:06:50]
fiber optics underground. And so, uh
[1:06:52]
it's certainly certainly a positive
[1:06:54]
thing. So, we've talked quite a bit
[1:06:56]
about infrastructure and investments in
[1:06:58]
infrastructure in just about every way
[1:06:59]
we can. We've talked about roadways and
[1:07:01]
and bringing new business and creating
[1:07:03]
new jobs and um helping existing
[1:07:06]
businesses continue to grow, those
[1:07:07]
people that have been paying the taxes
[1:07:09]
and been, you know, continue to hire
[1:07:11]
people and supporting them and growing
[1:07:13]
growing businesses and growing jobs. As
[1:07:15]
much as we love it for uh much as we
[1:07:18]
want to continue to create those good
[1:07:19]
jobs for people to work here, we really
[1:07:21]
want to see them live here, too. This is
[1:07:23]
such a great community. and we'd like to
[1:07:24]
welcome more residents to our community.
[1:07:26]
So, tell us a little bit about housing
[1:07:28]
opportunities. What what what's the
[1:07:29]
landscape look like in Iberia Parish
[1:07:31]
right now?
[1:07:31]
» We have several developers that's
[1:07:33]
looking to do things in Iberia Parish.
[1:07:36]
Uh
[1:07:37]
again, in certain areas where they're
[1:07:40]
looking to develop, I constantly talk to
[1:07:42]
them about taking your time because uh I
[1:07:45]
want to make sure that when they're
[1:07:46]
building these subdivisions, they're not
[1:07:49]
having a negative impact on the
[1:07:51]
surrounding areas. But Ravenwood is a
[1:07:54]
subdivision. Uh when you go down Admiral
[1:07:56]
Doll all the way to 88, that's an area
[1:07:58]
that's actually being developed right
[1:08:00]
now. We have some 100 lots right there.
[1:08:02]
Uh Coto Ridge subdivision, we actually
[1:08:04]
in phase three. That's some 200 plus uh
[1:08:08]
lots that's actually available and they
[1:08:09]
got some nice homes in there. They're
[1:08:11]
building some very nice homes in there.
[1:08:13]
Test Ridge subdivision. Um, Test Ridge
[1:08:17]
was actually um purchased by uh another
[1:08:20]
company recently and they are doing some
[1:08:23]
wonderful things. Uh, matter of fact,
[1:08:26]
um, we have I was going to say something
[1:08:29]
that the mayor probably don't want me to
[1:08:31]
say, but they're doing some wonderful
[1:08:33]
things here in Iberia Parish. And uh,
[1:08:35]
another another developer is um, uh,
[1:08:38]
Cherokee. Cherokee have some 22 acres
[1:08:41]
that they have actually divided.
[1:08:42]
building uh going to be building some
[1:08:44]
very nice homes in in that area. So, we
[1:08:46]
got some development going on in Iberia
[1:08:48]
Parish, but we need development in
[1:08:51]
Iberia Parish. When you when you when
[1:08:53]
you say you have 600 being employees
[1:08:55]
being people hired at the port for this,
[1:08:57]
another 300 hired for this, 800 plus
[1:09:00]
hired for that company, you need some
[1:09:02]
homes and we need some affordable homes.
[1:09:04]
U and it's critical that we can um try
[1:09:07]
to make that work for our very parents.
[1:09:09]
So far, we're doing well.
[1:09:10]
» Absolutely. Well, that's certainly good
[1:09:11]
to hear. And so as we talk about
[1:09:13]
bringing in new residents, as we talk
[1:09:15]
about our existing residents and you
[1:09:17]
know how they live here and grow and
[1:09:18]
raise families here, um it's all about
[1:09:21]
quality of living and we've talked about
[1:09:22]
recreation in the past and and things of
[1:09:24]
that nature. Quality of living, people
[1:09:26]
knowing that when they come to a
[1:09:28]
community that it's safe and that
[1:09:29]
there's a good quality of living as
[1:09:31]
well. [clears throat] Um along those
[1:09:32]
lines, let's talk just a little bit
[1:09:34]
about animal control. Tell us a little
[1:09:36]
bit about animal control.
[1:09:36]
» Animal control is a is a big deal for
[1:09:39]
Iberia Parish. of course is a is a
[1:09:41]
department that we have that's really
[1:09:42]
don't have a dedicated fund. Um but
[1:09:45]
we're dedicated to promoting the safety
[1:09:46]
of the animals that we actually bring to
[1:09:49]
animal control. We have a very good
[1:09:51]
person that's actually that's managing
[1:09:53]
that place. Amanda uh we're dedicated to
[1:09:56]
trying to do everything that we need to
[1:09:57]
take care of these these animals. Uh
[1:10:01]
currently we actually house animals from
[1:10:02]
the city of Newberry from all from
[1:10:05]
around the whole parish to be frank with
[1:10:06]
you. But the city of Newberry of course
[1:10:08]
is the biggest city. So we would have
[1:10:10]
more from them. Uh the department the
[1:10:12]
department is responsible for all the
[1:10:14]
calls that they get that's talking about
[1:10:15]
animals in any kind of way. Uh the
[1:10:17]
weather whether it's an abandoned animal
[1:10:20]
but our goal is to try to find a home
[1:10:22]
for these animals. That's what we do
[1:10:24]
with the few dollars that we have. We're
[1:10:26]
very very fortunate because we now are
[1:10:29]
going to be building another facility.
[1:10:31]
The bids are going to come in on
[1:10:32]
February the 5th. Uh we have two
[1:10:35]
facilities, two buildings right now that
[1:10:37]
we're keeping. We're going to kind of
[1:10:38]
clean them up a little bit and um we
[1:10:41]
building this nice facility on the side.
[1:10:44]
What we trying to do right now is just
[1:10:46]
to make it where we can adopt more more
[1:10:48]
animals and and make it a safe place. U
[1:10:51]
and it's it's going to be designed very
[1:10:53]
well. Wonderful. Wonderful. So, we've
[1:10:55]
been talking about a lot of numbers. Uh
[1:10:57]
you know, million here, five million
[1:10:59]
there, 19 million here. So, it's it's a
[1:11:01]
lot of a lot of dollars. uh some that
[1:11:04]
are being invested now, some that we see
[1:11:06]
coming in the into the future. Take a
[1:11:07]
look at this list. This is quite
[1:11:09]
impressive. Tell us a little bit about
[1:11:11]
some of the uh ongoing infrastructure
[1:11:12]
investments that you've seen here in the
[1:11:14]
parish so far. We have a lot of invest
[1:11:17]
investors and investments um that's been
[1:11:19]
done in Iberia Parish. Airport
[1:11:21]
development, we got uh roughly $9
[1:11:23]
million that's been invested over there.
[1:11:26]
Recreation, some $3 million, but we have
[1:11:28]
drainage and flood control like $16
[1:11:30]
million. We have uh in economic
[1:11:33]
development industrial we have uh $1.3
[1:11:36]
billion dollars uh and these are
[1:11:39]
projects that's actually have been done
[1:11:41]
you know so we're very fortunate with
[1:11:42]
that when you're talking about public
[1:11:44]
facilities public buildings you got 12.5
[1:11:47]
million we did there technology some $4
[1:11:50]
million transportation and bridges again
[1:11:52]
I talked to you earlier about Paris
[1:11:55]
using and working with the federal
[1:11:57]
government we get money from the state
[1:11:58]
we get money from the federal government
[1:11:59]
» Leveraging
[1:12:00]
» That's all it Yes. And uh and the state
[1:12:03]
actually do work in each parish in this
[1:12:06]
um in this great state of ours. But we
[1:12:09]
have some $221 million that's actually
[1:12:12]
been invest in road work in our barrier
[1:12:14]
parish there. Water and sewer
[1:12:15]
infrastructure, $38 million. Uh you
[1:12:19]
know, so we have some big big things
[1:12:20]
going on here.
[1:12:21]
» So that's what we've seen so far. What
[1:12:23]
are you expecting in the future as far
[1:12:25]
as investment? When you when you're
[1:12:26]
talking about just the commercial canal
[1:12:28]
and the Del canal, you're talking $235
[1:12:31]
million for that. That's a big deal. Uh
[1:12:33]
when you're talking about the east side
[1:12:35]
development at the airport, that's like
[1:12:36]
$64 million. That's that's a lot a lot
[1:12:40]
of work that's going to be done at that
[1:12:41]
airport that by providing and building
[1:12:44]
those tangibles there, we're going to
[1:12:46]
bring even more businesses here and we
[1:12:47]
get even more money. The post evacuation
[1:12:50]
center that we actually have that was
[1:12:51]
actually put down for a minute. We're
[1:12:53]
not going to stop. We have um roughly
[1:12:57]
16,000 people in IB Paris living in
[1:13:00]
poverty. I will never stop trying to
[1:13:01]
figure out how to help these people when
[1:13:03]
they need. So that's still on the table.
[1:13:05]
We're still trying to move that forward.
[1:13:07]
You're going to remember the hangar
[1:13:08]
drive extension. You and I went to Baton
[1:13:10]
Rouge. We actually testified to get the
[1:13:12]
$16 million. If we wouldn't have gotten
[1:13:14]
that, that was going to really
[1:13:15]
» That's that crowning fourth roadway
[1:13:18]
that's going to bring uh commerce and
[1:13:20]
traffic right into the heart of the
[1:13:21]
airport.
[1:13:21]
» That's exactly right. is going to is
[1:13:23]
going to is hangar drive. So we're going
[1:13:25]
to get hanger drive and we're going to
[1:13:26]
bring hanger drive all the way to LEL.
[1:13:28]
Then from LEL to corporate drive we're
[1:13:29]
going to do a roundabout there.
[1:13:31]
» It's a very big deal for us. We have I'm
[1:13:33]
going to get [clears throat] to the end.
[1:13:34]
We have the west side develop that that
[1:13:36]
we talked about with that spur on 3212.
[1:13:39]
That's $28 million. We have a we have a
[1:13:42]
lot of work that's going on in this
[1:13:43]
parish that we've done that we presently
[1:13:46]
doing and that we're looking to do in
[1:13:48]
the very very near future. You may not
[1:13:50]
believe this, but I did some very, very
[1:13:52]
quick math in my head. I just wrote it
[1:13:53]
right on my hand. And the addition on
[1:13:55]
that comes out to the number that you
[1:13:56]
see on your screen right now.
[1:13:57]
» Okay, that number. Yeah, that's a big
[1:14:00]
deal. I already know that number.
[1:14:01]
Believe it. That's 2 billion80 million
[1:14:04]
in Iberia Parish. very very proud to say
[1:14:07]
that my administration, the Aberia
[1:14:10]
Parish Council and every other partner
[1:14:13]
that we worked with talking state,
[1:14:15]
federal, whatever, whomever work
[1:14:18]
together to see this happen in Aberia
[1:14:20]
Parish. Very, very proud of it.
[1:14:22]
» Absolutely. So, this is a huge number
[1:14:24]
and it and and it represents a lot of
[1:14:27]
hard work by a lot of different people
[1:14:28]
to bring investment uh to our area. And
[1:14:31]
I've always said if we expect people to
[1:14:32]
invest in us, we've got to be willing to
[1:14:34]
invest in ourselves. And so this is
[1:14:36]
certainly a huge number and it's
[1:14:37]
resulting in a lot of things. We talked
[1:14:39]
about businesses, we talked about uh
[1:14:40]
fiber optic connectivity, we talked
[1:14:42]
about housing developments and whatnot.
[1:14:44]
What have these investments meant over
[1:14:46]
the years in terms of growth in jobs and
[1:14:49]
wages and industry.
[1:14:50]
» The one thing I I look at the most is
[1:14:53]
the unemployment rate. In 2016, it was
[1:14:57]
around seven and 8%. Right now, we're a
[1:15:00]
little bit over four% to 5%.
[1:15:02]
» Cut it in half. we cut it in half
[1:15:04]
roughly. Uh that's a big deal. I look at
[1:15:07]
all of the other things that that that's
[1:15:08]
actually being discussed, the economic
[1:15:10]
uh dependencies, the u you know the
[1:15:12]
small business work that's actually
[1:15:14]
taking place, that's all great, but I'm
[1:15:16]
looking at jobs and I'm looking at how
[1:15:18]
you can keep people working. If you can
[1:15:20]
keep people working and they're making a
[1:15:21]
decent salary where they can have a
[1:15:22]
decent quality of life, um that's what
[1:15:25]
it's all about for me. It's, you know,
[1:15:27]
people going out making $25,000 a year,
[1:15:29]
$30,000 a year and they got a family of
[1:15:31]
four. That's not cutting it. We have to
[1:15:34]
do better in Iberia Parish. We have to
[1:15:36]
take care or put people in a position to
[1:15:40]
where they can actually be successful.
[1:15:41]
And I I'm telling you, the biggest thing
[1:15:43]
in this whole parish that gets to me is
[1:15:46]
the poverty rate, right? It's too much,
[1:15:48]
right? Uh we we need to figure out how
[1:15:51]
to get people in a position to help
[1:15:52]
themselves. And um
[1:15:55]
that's a big deal for me.
[1:15:56]
» Well, we sure have talked about a lot of
[1:15:58]
different things as far as uh optimistic
[1:16:00]
outlook and uh the optimism in the
[1:16:03]
parish and the way that it's growing and
[1:16:04]
um our our potential if we continue to,
[1:16:07]
you know, the momentum is moving, if we
[1:16:09]
can continue to move that momentum and
[1:16:10]
keep that momentum going, um what it
[1:16:12]
might look like. Let's just talk about
[1:16:14]
your thoughts on the the upcoming and
[1:16:16]
the the future economic outlook for
[1:16:18]
Iberia [clears throat] Parish. I
[1:16:19]
» I think we have some very good momentum
[1:16:20]
that's going on in Iberia Parish. Look,
[1:16:22]
I have a year and 11 months left in this
[1:16:24]
position. Uh, whoever is going to become
[1:16:26]
the Paris president, I just hope they
[1:16:28]
continue to try to bring infrastructure.
[1:16:31]
If you can bring infrastructure, you're
[1:16:32]
going to bring the businesses. You're
[1:16:33]
going to bring the homes. But keep in
[1:16:35]
mind, it's about quality of life for the
[1:16:38]
people that you're actually
[1:16:38]
representing. And [clears throat] in
[1:16:40]
this business, you represent everybody
[1:16:43]
in the parish. You don't represent a
[1:16:44]
group. Uh, if you get where I'm coming
[1:16:47]
from. So what I'm looking at in
[1:16:49]
[clears throat] this parish is about the
[1:16:52]
longevity of the parish and making it a
[1:16:54]
place where we can stay strong, get
[1:16:56]
private investors to invest in what's
[1:16:58]
going on, do do partnerships uh with
[1:17:00]
different companies, try to get the
[1:17:02]
economy right. Uh and so far we're
[1:17:04]
heading in that position. The deal is
[1:17:07]
will we stay heading in that position.
[1:17:09]
Uh so for me uh it's all about growth.
[1:17:12]
We have a we have a great momentum. Uh
[1:17:14]
Mike, I hope whoever come after me work
[1:17:16]
close with you because I'm going to give
[1:17:18]
you a major accolade right here. Most of
[1:17:21]
the things that we talked about is
[1:17:23]
things that you and I created or started
[1:17:26]
not I don't want to use the word created
[1:17:27]
talked about many many years ago and
[1:17:30]
it's and it's tough you know you come up
[1:17:32]
you dream up these great things but you
[1:17:33]
got to get buy in and I'm fortunate that
[1:17:36]
I have a council that understand uh what
[1:17:39]
I'm trying to do and it's helping you
[1:17:41]
you know they actually giving you some
[1:17:43]
money every year for um what it is that
[1:17:45]
you're doing with IDF and um we we just
[1:17:48]
have a great chemistry that's going on
[1:17:50]
right Now I just wish it don't change
[1:17:53]
too much.
[1:17:53]
» Well, you know, moment Thank you, sir,
[1:17:55]
for saying that. And you know, the
[1:17:56]
momentum has begun. I think if we
[1:17:58]
continue to invest in ourselves as a
[1:18:00]
community, uh there's no reason why we
[1:18:03]
can't continue to have more optimistic
[1:18:05]
things moving forward, growing our
[1:18:07]
community for our for our citizens, um
[1:18:09]
and uh moving forward all together. Uh
[1:18:12]
we're just about uh concluded tonight,
[1:18:15]
but I wanted to give you the opportunity
[1:18:16]
maybe to mention something that uh maybe
[1:18:19]
something that we didn't cover tonight.
[1:18:20]
Anything in closing?
[1:18:21]
» Well, the only thing I'm going to close
[1:18:22]
with is I want to thank my wife for
[1:18:24]
allowing me to do this for the 20 plus
[1:18:25]
years that I've done this, Kim. I mean,
[1:18:28]
my wife and my family mean everything to
[1:18:30]
me, Mike. Um and honestly speaking, I
[1:18:33]
don't want to sound like I'm ready to
[1:18:35]
get out of office, but I'm ready to
[1:18:36]
spend time with my wife and my family. I
[1:18:38]
really am. In this particular business,
[1:18:41]
you get a lot of people that say a lot
[1:18:43]
of things. They really feel that they
[1:18:44]
they know you a little bit better than
[1:18:46]
they do. So, they have a tendency to say
[1:18:48]
things or whatever the case. I have a
[1:18:49]
very strong wife who knows me better
[1:18:51]
than anyone. [snorts]
[1:18:53]
So, um I just want to make sure that I
[1:18:56]
give her the d the diligence that I
[1:19:00]
should. Um because without her, of
[1:19:02]
course, I wouldn't be where I'm at.
[1:19:04]
» Sure. Um this particular building I'm
[1:19:06]
gonna say this in two weeks Thursday
[1:19:08]
after next I celebrated my wedding an uh
[1:19:12]
my wedding
[1:19:13]
» Memorial building right here in
[1:19:14]
» I celebrated my wedding um reception
[1:19:18]
right here. It'll be 43 years Thursday
[1:19:21]
after next.
[1:19:22]
» So it's all about you Kim. Love you.
[1:19:24]
» Happy anniversary.
[1:19:25]
» So that's all that's all I have to say.
[1:19:26]
» Yeah. Well Mr. President, thank you so
[1:19:28]
much for having me. I want to uh put
[1:19:30]
this uh QR code up here. This is another
[1:19:33]
QR code. I encourage you uh to scan it.
[1:19:36]
Uh especially those that are watching us
[1:19:38]
uh via video. Uh this this QR code will
[1:19:42]
bring you to a booklet. There's there's
[1:19:43]
a booklet that's being distributed
[1:19:45]
tonight um that gives you a lot of
[1:19:47]
details and some additional
[1:19:48]
illustrations about what we talked about
[1:19:50]
tonight. This QR code will bring you to
[1:19:52]
an electronic version of that booklet.
[1:19:54]
It's very well done and I encourage you
[1:19:56]
to uh scan the QR code while it's on the
[1:19:58]
screen and download that and follow
[1:20:00]
along with us as we go. I want to I want
[1:20:03]
to thank you uh Mr. Rishard for for
[1:20:05]
allowing me to be here with on what is
[1:20:07]
our 10th opportunity to come up here on
[1:20:09]
stage. It's hard to so hard to believe.
[1:20:11]
I really want to thank the citizens who
[1:20:13]
came out tonight. We've almost got a
[1:20:14]
full house as far as I can tell. And uh
[1:20:17]
we really appreciate you being here.
[1:20:18]
It's certainly been my pleasure. Uh and
[1:20:21]
until next time, I want to wish everyone
[1:20:23]
a good night. Thanks for joining us.