Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
[0:46]
Good morning, everyone. Thank you for being here this morning.
[0:52]
I would like to open this meeting, and I would
[0:54]
like to acknowledge that we are gathered today. On the
[0:57]
traditional ancestral unseated territory, the Celex Okanagan people. This meeting
[1:02]
is open to the public and all representation to council
[1:06]
form, part of a public record and a live audio
[1:08]
video feed is being broadcasted and recorded on Kelo. Kelowna.
[1:14]
Ca. May I now pass this over to the city
[1:17]
manager, please? Thanks very much, your worship. And good morning,
[1:21]
council. I'm pleased to present council with today's. Preliminary 2026
[1:27]
budget, which is our funding roadmap to building the city
[1:30]
of the future vision that we all share. Given that
[1:35]
this is the last budget of the year term. It's
[1:39]
kind of logically focused on delivering on all of your
[1:41]
stated priorities and making investments in those essential services and
[1:45]
infrastructure that are going to improve the lives for all
[1:49]
of our citizens. Notably, today's budget makes fairly significant strides
[1:54]
towards those goals that you have set out. For us
[1:57]
while keeping our taxes. Competitive, stable, and certainly in line
[2:02]
with the commitments that we've made to you throughout the
[2:05]
entire term. As all of you know, this year's budget
[2:08]
is part of a multi year. Financial cycle. With every
[2:13]
funding decision focusing on community needs as defined in many
[2:17]
of those plans and strategies that council has approved over
[2:20]
the last three years and beyond. And from that perspective,
[2:25]
there should be no surprises in this budget for council
[2:28]
or for the public as you weighed through it today.
[2:32]
It's simply the culmination of your collective decisions throughout the
[2:36]
entire year and throughout the term and this budget truly,
[2:40]
I think, reflects those decisions and your direction back to
[2:43]
us. All of your six council priorities, and the 25
[2:48]
action items that are in that document serve as our
[2:51]
compass throughout the year and throughout the term. Particularly when
[2:55]
we're building and amending our budgets, developing the strategies that
[2:59]
we bring to you. And when determinations are made. On
[3:04]
resource allocation or reallocation like we do many times throughout
[3:09]
the year. Your direction makes sure that every dollar we
[3:13]
spend or every new dollar we spend works towards tackling.
[3:16]
Those biggest challenges that the communities told you about and
[3:19]
that make up your priorities. Our budget also ensures that.
[3:25]
We are building a very carefully planned future. As municipality,
[3:29]
we try and take the view or the long game,
[3:33]
and to that end, our budget. Supports the. Well developed
[3:37]
plans and strategies like the official community plan. The ten
[3:40]
year capital plan that you recently endorsed. Our fight of
[3:43]
year financial plan and a whole host of master plans,
[3:46]
some of which have been updated by you under this
[3:49]
term. In the budget, you're going to recognize that the
[3:52]
top community priorities, like community safety, transportation, have received the
[3:57]
greatest attention and the greatest share of the budget increase.
[4:01]
We're adding resources. For police fire bylaw to enhance public
[4:06]
safety. We're accelerating the construction of roads. Bridges, sidewalks, multimodal
[4:12]
transportation. And bike lanes to improve mobility for everybody in
[4:17]
our community. And we've also earmarked new funding for transit
[4:20]
operations and traffic safety, which we've talked quite a bit
[4:23]
about. This term. At the same time, we're moving ahead
[4:27]
with some transformational projects that are going to leave a
[4:30]
real legacy in our community related to parks in many
[4:34]
new neighborhoods distributed across the city. And building modern recreation
[4:39]
facilities in sports fields through the. Building stronger colonial initiative.
[4:46]
Well, much of the 26 budget looks to the future.
[4:48]
Of course, we always have to look after today as
[4:51]
well, to keep the city running smoothly. Road repairs, snow
[4:55]
removal, upkeep of parks and boulevards, enhancements to traffic safety.
[5:01]
We know, these are all escalating, and we have to
[5:04]
keep up with that. Escalating. Budget if we want to
[5:06]
keep our city safe, clean, and a strong place for
[5:10]
people to move. To and do business that proactive maintenance.
[5:14]
And I dare say our award winning asset management program
[5:18]
are two ways we take care of our infrastructure behind
[5:21]
the scenes. To ensure that services continue uninterrupted and that
[5:25]
those assets get their full lifecycle. Inside the city. We're
[5:31]
also modernizing how we do business, focusing on digital transformation
[5:36]
and operational efficiencies. Now, I think we all know. That
[5:41]
the city of Colon is recognized as a fairly high
[5:44]
performing organization amongst our peers, and we're now really laser
[5:48]
focused on automation, cybersecurity and improving customer service at every
[5:54]
touch point. And to this end, for council's knowledge, we
[5:58]
have added additional emphasis in 26 and beyond. On improving
[6:02]
the customer experience. It has become one of our corporate
[6:06]
priorities for the next few years. These internal investments are
[6:13]
certainly going to make it a lot easier for residents
[6:16]
to access our services. And ensure CD operations are efficient
[6:20]
and effective. We also recognize that some of our costs,
[6:24]
like policing transit, construction materials are all rising and well
[6:31]
beyond our control. However, thanks to careful planning, strong investments,
[6:36]
and a focus on partnerships and own source revenues, We're
[6:40]
able to absorb many of these pressures with minimal impact
[6:43]
on taxations. In fact, the cost to operate our city
[6:47]
for 2026 will go up by somewhere in the range
[6:50]
of 11%. While we're only proposing to increase property taxes
[6:54]
by 4.47%, this means we can continue to deliver the
[6:58]
essential services and your prior. Priorities around community safety, mobility
[7:02]
and quality of life without putting that added burden on
[7:05]
our citizens. And despite seeing a continual reduction in our
[7:10]
reliance on taxation over the last number of years, we've
[7:13]
gone from 25% tax reliance down to 20% tax reliance.
[7:18]
We're continuing to pursue all those external funding opportunities, such
[7:23]
as partnerships and grants, to further reduce the reliance on
[7:26]
taxation. Across all of our service areas. Our funding decisions
[7:30]
prioritize cost efficiency. High quality service and that meaningful impact
[7:36]
on the community. And finally, your worship, before I turn
[7:40]
the meeting over to you, I'd like to acknowledge. That
[7:43]
the enviable financial position that we find ourselves in compared
[7:46]
to many of our peers. Does not happen by chance.
[7:51]
It's a result of the culture of fiscal responsibility and
[7:53]
innovation that's embedded in our organization to make it possible.
[7:58]
It's the people that are going to be in this
[7:59]
room throughout today. Those that are out there on the
[8:02]
front lines. Certainly my senior leadership team and of course,
[8:07]
our incredible financial management group that make it all happen.
[8:11]
So I hope today is an enjoyable discussion with council
[8:14]
and that you see the decisions and direction that you've
[8:17]
given. Reflected in the budget document that we're presenting. Thank
[8:22]
you, worship. It's all yours. Thank you. And just a
[8:26]
word from myself. On behalf of myself and on behalf
[8:30]
of council. We recognize the work that needs to be
[8:35]
done. By our city manager. By all senior leadership, by
[8:40]
all department heads, and the commitment that is made all
[8:43]
the way through. The organization with regards to all the
[8:45]
different staffing levels. And this is, as we have said
[8:50]
a few times, we've put it into a process. Where
[8:54]
it goes through and is before us numerous times throughout
[8:58]
the year. To help secure the direction of exactly what
[9:03]
we're looking at trying to accomplish today. And. That is
[9:07]
done because. Of the strong finance team that Mr. Sass
[9:13]
runs. His whole team and the organization itself with regards
[9:18]
to trying to meet the demands of the priorities that
[9:21]
we set forward. So. It's going to be an interesting
[9:26]
day. We are very looking forward to it. But before
[9:30]
we start, we just wanted to thank all of those
[9:33]
involved. In discussions with Mr. Sass. This day has comparisons
[9:40]
to the Great cup, the Stanley bowl, the Stanley cup,
[9:45]
the Super bowl. So all of those highlights. So I
[9:51]
think it's only appropriate that we just thank them for
[9:54]
everyone, for all the work that they've done and all
[9:55]
the commitment that they've made to bring this forward to
[9:58]
us today. And as I pass this over to the
[10:01]
city clerk, let's kick. This off. Thank you, your worship.
[10:06]
The general manager of corporate services will provide an overview
[10:09]
of the 2026 financial plan, and then staff will go
[10:12]
through each of the service areas. Thank you, your worship.
[10:16]
Just a few slides for me this morning, and then
[10:18]
you won't. Have to listen to me anymore. I know
[10:19]
it's been a lot, but one of my favorite things
[10:21]
about this time of year is the intensity of the
[10:24]
communication that we get around budget. Time. And so we
[10:27]
get more engagement, more feedback, more questions. From the community,
[10:31]
the media council, the public, our colleagues in this week
[10:36]
than we do in the other 51 weeks of the
[10:38]
year, and so it's really important to me. And the
[10:41]
rest of the finance team that we hear those questions
[10:44]
and comments and are able to come back and provide
[10:46]
some real time information to help address what we're hearing
[10:49]
out in the community. So to that end, I have.
[10:51]
A few new slides just to show to hopefully address
[10:55]
some of the questions and comments that we're hearing from
[10:57]
council and the public and so on. So this is
[11:00]
exactly the slide that Mr. Gilchrist alluded to around. The
[11:05]
total spend or service delivery in our budget as compared
[11:08]
to the amount of taxation that's. Funding it. And so
[11:12]
the blue bar there is the total budget. The red
[11:15]
bar is the tax and the green bar there is
[11:17]
the percent that is tax funded, so you'll see. That
[11:21]
in 2022, we were north of 25% for the. 2026
[11:26]
proposed budget we're just over 20% in terms of the
[11:28]
overall service delivery. That's proposed to be funded by taxation.
[11:33]
This slide. As you know, this time of year, the
[11:35]
tax rates for our comparator communities come out very, very
[11:39]
quickly. And so this is just an updated slide that
[11:41]
we showed. Actually, I believe on Monday. This is our
[11:44]
two year tax rate compared against our comparator groups. But
[11:49]
more importantly, The team has very, very quickly put together
[11:54]
this slide, and this shows the cumulative impact of the
[11:57]
tax rates over the council term. Now, what is notably
[12:01]
missing from this is West Kelowna. West Kelowna is just
[12:04]
shy of 32%. I believe so would be in between
[12:08]
New Westminster and mission, but this slide shows. Exactly what
[12:12]
it is that we're trying to do year by year.
[12:14]
There is a great deal of volatility in the tax
[12:16]
rates. And our comparators, again are much more volatile than
[12:21]
we are. And so there was a lot of, there
[12:23]
was a lot of questions around Vancouver's 0% tax rate.
[12:27]
And what we're doing here is predictable, stable increases. That.
[12:32]
Pay dividends, so to speak, over time. And what you
[12:34]
can see here is we've. Come in exactly between 3.7
[12:38]
and 4.5% over this five year period and we remain
[12:42]
the lowest over that period. So in any given year,
[12:45]
a lot of things happen, but what we're really striving
[12:48]
for is that long term financial planning and that's. What
[12:50]
the financial planning team again. Was recognized for this year
[12:54]
through the GFOA Budget Award is that we take that
[12:56]
long. Term view and over time, This is good news
[13:00]
for our community. Another slide that we've looked at in
[13:04]
the prior year, which, again, is very dynamic because this
[13:07]
data has not actually come out yet for 2025, but
[13:10]
this shows our budgeted ftes per thousand population. Now, this
[13:14]
one's a little bit different because the various municipalities as
[13:17]
you know, offer various different services. And so what I'd
[13:20]
say kelo. Kelowna in the middle of the pack, recognizing
[13:23]
that we operate our own airport. None of our comparator
[13:26]
municipalities operate their own airport, as well as the fact
[13:29]
that. We run our own utilities, so our lower mainland
[13:33]
comparators would not show. Metro Vancouver regional districts. Ftes, which
[13:40]
run the commercial part of the utilities, where we handle
[13:42]
that ourselves. So we're also the regional hub, whereas many
[13:46]
of our comparator municipalities are. One of 22 relatively equally
[13:52]
sized municipalities, whereas the city of Kelowna, we're a bit
[13:54]
of a hub for the surrounding communities. So overall, this,
[13:58]
to me, shows a lot of responsibility. I think the
[14:01]
city of Kelowna, like I said, we offer more services
[14:04]
broadly than many. Of our comparators. We're right around the
[14:06]
middle of the pack on the FTE. Mark, and very
[14:09]
much on the low end. Of the dollar mark and
[14:11]
the tax mark. So with that said, this is just
[14:14]
responding again to some of the feedback and comments that
[14:16]
we've heard out in the ether, and with that said,
[14:19]
unless there's any questions or comments, I'm happy to pass
[14:21]
it over to Mel and we'll get underway. Mr. Sass.
[14:24]
Thank you, counsel. Do we have any questions? Of Mr.
[14:26]
Sass before we begin. Seeing none. Thank you. And once
[14:30]
again, I just want to thank you for your work
[14:33]
alongside your team's work and bringing this forward to us
[14:35]
today. So thank you, Joe. So I'm going to start
[14:40]
today with a quick summary of how today will run.
[14:45]
So we're going to start the day with the airport,
[14:48]
which is on page 77 of your budget volume, and
[14:51]
we'll follow the order of the book, ending with enabling
[14:54]
services at the end of the day. Each service area
[14:58]
presentation will start with an introduction of the service area,
[15:02]
including performance measures, accomplishments, and improvements. I'll then summarize the
[15:08]
expenditure budget being requested and the recommended funding strategy. Then
[15:13]
we will go through the budget request for 2026. We
[15:17]
will start with the priority one operating request. Then we
[15:20]
will look at the priority one capital. Request, and then
[15:23]
we will look at priority two requests, if there are
[15:26]
any. Council is invited to ask questions at any time
[15:30]
throughout the day, and you are also welcome to make
[15:33]
a motion to star budget requests, and what that will
[15:36]
do is have them be brought back. At the end
[15:38]
of the day, after deliberation of all other service areas
[15:41]
is complete. We have senior leadership staff and various other
[15:46]
staff members available throughout the day in council to answer
[15:49]
any questions that you may have on any of the
[15:52]
budget requests, and we also have staff listening. In the
[15:56]
back and available to do research if required. So this
[16:01]
budget recommends a 2026 taxation demand of $213.4 million, which
[16:08]
is a 4.47% increase over 2025. The chart on the
[16:15]
screen and the handout that you should have at your
[16:17]
seat has a summary of different dollar changes and the
[16:21]
taxation demand. With the associated impact to the taxation percent
[16:26]
change. Before we start, I'll just want to walk through
[16:31]
a couple budget funds that are being recommended for use
[16:34]
is part of this plan. We'll start with the public
[16:37]
safety levy. So the 2026 public safety levy is 1%
[16:42]
of the 2025 taxation demand, or 2 million. $42,700. This
[16:52]
is recommended to fund four additional firefighters, three RCMP members,
[16:58]
one police services financial analyst and two by law enforcement
[17:02]
officers. This will total 900,800 in 2026. And then be
[17:08]
annualized in 2027. Ongoing the remaining 2026 balance of $1.14
[17:15]
million. Is further recommended to be used as part of
[17:18]
this budget to help fund the RCMP contract. Cost increase
[17:22]
associated with maintaining our current RCMP complement. The second budget
[17:28]
item is the council priority funds. So this plan included
[17:32]
a recommended budget of $500,000 for 2026 to support council
[17:38]
initiatives from this 500,000 250,000. Is being recommended to fund
[17:44]
the sport and community. Events activation request and $100,000 for
[17:51]
the enhanced business improvements area services request. This leaves $150,000.
[17:59]
Unallocated and is available for additional requests in 2026 or
[18:04]
to be used as a funding source today to bring
[18:07]
forward other budget requests in the budget volume. You'll find
[18:12]
this $150,000 as a budget request titled council initiatives under
[18:17]
the governance and leadership service Area Council also has $185,000
[18:23]
remaining in the council strategic reserve and this is available
[18:27]
for one time purposes. So now I will welcome the
[18:31]
acting director of Airport Finance and corporate services, parthartpartel. And
[18:36]
we'll start with the airport. Thank you. Thank you. Good
[18:40]
morning, parse. Good morning, your worship. The airport is a
[18:46]
widow and rapidly growing aviation and transportation hub serving communities
[18:51]
within the Okanagan Valley by being an economic engine for
[18:54]
the region and providing high quality facilities in a safe
[18:58]
and costeffective manner. Currently, the airport offers more than 60
[19:02]
daily nonstop flights to 21 year round and seasonal destina.
[19:05]
Destinations with eight airlines. Looking first at our key accomplishments
[19:10]
for 2025. We are on track for another record year
[19:14]
with annual passengers expected to exceed 2.3 million, which represents
[19:18]
a growth of more than 9%. Over our previous all
[19:22]
time high of 2.1 million passengers, which we reached last
[19:25]
year. This. Passenger growth has been driven by enhanced air
[19:31]
service, including up to four times daily service to Toronto.
[19:36]
This includes service with Porter Airlines in Utah, which we
[19:39]
welcomed in the spring of this year. Enhanced connectivity within
[19:43]
the region, such as through the recently added Cranbrook service
[19:46]
through Pacific coastal airlines and improved service to the sun
[19:50]
destinations. Overall, the airport's 2025 seat capacity has seen an
[19:55]
increase of more than 16%. 2025 has also been a
[19:59]
very busy construction year for the airport. We have completed
[20:03]
the construction of the operations and emergency services building. A
[20:07]
multiyear project which has been completed on time and on
[20:10]
budget. The airport also continues to make significant progress with
[20:14]
the construction of the airport terminal building expansion, which is
[20:17]
slated to open in Q one of 2026. This project
[20:22]
is expected to be completed on budget and ahead of
[20:24]
the original timeline. Finally, construction work is underway on the
[20:29]
airport hotel in Parcade. As well as on the. Expansion
[20:32]
of the campus childcare facility. With regards to continuous improvements,
[20:37]
the airport continues to renew terminal building infrastructure, including both
[20:41]
lifecycle replacements as well as upgrades to critical assets, in
[20:45]
addition to ensuring that assets are well maintained to maximize
[20:48]
their useful lives. Airport also continues to purchase airsite equipment
[20:54]
as required. This includes additions to our fleet to keep
[20:57]
up with our significant growth. A good example of this
[21:01]
is our recent purchase of a third aircraft rescue and
[21:03]
firefighting vehicle. Which was purchased because our growth require that
[21:07]
we be able to provide a category seven emergency response.
[21:11]
Rather than a category six response. Looking next at our
[21:15]
performance measures. The airport's performance measures are based on the
[21:20]
key strategic goals within the airport strategic plan one of
[21:24]
these strategic objectives is regional economic development. As the largest
[21:28]
municipality owned airport in Canada, the 9th busiest nationally and
[21:32]
the second busiest in BC. The airport strives to be
[21:35]
a key driver. Of economic growth within the region. In
[21:39]
this regard, the airport has seen strong year over year
[21:42]
passenger volume growth with a 9% growth expected this year
[21:46]
and a further growth of over 6% expected in 2026.
[21:51]
As for accountable leadership, the airport was able to achieve
[21:54]
airport carbon accreditation level three this year. A significant milestone,
[21:58]
which was reached one year ahead of target, as our
[22:01]
goal was to be at level three. In 2026, the
[22:04]
airport continues to implement initiatives and projects around sustainability and
[22:09]
climate action. In line with the airport's overall objectives of
[22:13]
being carbon neutral by 2030 and net zero by 2040.
[22:17]
This concludes my. Comment of worship. Paris. Thank you. So
[22:22]
the airport service area makes up $113.1 million of the
[22:28]
total city's 1 billion. $50,000 budget. And is operated under
[22:37]
seven cost centers. This area is predominantly funded from fees
[22:42]
and charges. And also includes the funding recommendation of transfers
[22:46]
from reserves and other revenues and grant funding. The 2025
[22:52]
revised budget. Totaled $168,000,000. After the annualization of previously
[23:01]
approved budget items. We are starting 2026. With the $74,572,000.
[23:11]
In order for the service area to maintain current service
[23:14]
levels, an additional $12,140,000 is being requested. And to enhance
[23:22]
service levels, an additional $26,348,000 is requested. This area has
[23:29]
three operating requests. Excuse me.
[23:42]
The first one being additional revenue of $5.9 million. Ongoing.
[23:49]
This is coming. From. Covers grant funding that was previously
[23:57]
in budget. As well as be contributed to reserve for
[24:01]
future years. The second request is for $1.8 million in
[24:06]
2026 and then $1.6 million ongoing, funded from reserves and
[24:13]
other revenues. And the final one being the airport strategic
[24:17]
enhancements at $124,000 in 2026. And 242,000 ongoing, funded from
[24:24]
reserves. This area's capital. Request for 2026. Completely match. The
[24:34]
council approved ten year capital plan. Does council have any
[24:38]
questions on any of the airport operating or capital requests.
[24:43]
Councilor Lovegrove, you have a question? I apologize. I was
[24:47]
left behind because you'd mentioned you were going to start
[24:49]
with the airport. But then you actually went into reserve
[24:51]
funds, and I had a question about the reserve fund.
[24:54]
If you were touching on them. If that's okay, your
[24:56]
worship. I'm happy to answer questions right now. Or we
[25:01]
can talk about them when the individual requests come up.
[25:04]
It's actually about the airport reserve fund, and it's actually
[25:07]
a general question. I have no problem with us being
[25:09]
proposed, but the reserves for future. I want to make
[25:16]
sure I was reading this right. Under the projected balance,
[25:19]
2025. Am I right that that shows a 14 million
[25:24]
deficit carryover to 2026? Operations.
[25:35]
Your worship. That chart in the financial plan. Makes the
[25:42]
assumption that everything will be spent in 2025, but most
[25:48]
likely it will be carried over into the 2026 budget
[25:51]
year. So the balance will not fall into a zero
[25:54]
balance. Okay. So it's shown here on page 42 as
[25:58]
negative 14.418. And you're just saying that's basically. Bookkeeping. In
[26:03]
practical sense, we're fine. Yes, you're welcome. And thanks for
[26:07]
that. And then as our funding, our borrowing funds come
[26:12]
online that we've just recently went to council, for they
[26:16]
will be contributed to that reserve, and then it'll be
[26:19]
put back into a positive balance. Okay, thank you. And
[26:22]
just. Second question, Councilor Lovegrove. 1 second, I believe. Part
[26:25]
is going to touch upon that first before you go
[26:27]
to the second question. Your worship. We have two broad
[26:32]
categories of reserves. One is aif, one is non eif.
[26:36]
And so over the last several years, we had built
[26:38]
up our EIF reserve balance for the purposes of carrying
[26:40]
out what we are doing at this time, which is
[26:42]
the expansion of the ATB and that's why we have
[26:45]
drawn that reserve down. Going forward. As we have new
[26:50]
facilities come online with the additional revenues and fees and
[26:53]
charges that reserve balance. Will again start to build up
[26:56]
and set us up for future capital projects. Exactly what
[27:00]
I saw coming in projected contributions for 2026. So I
[27:04]
appreciated that, and I was hoping that the answer you
[27:07]
just gave was the answer. And so thank you for
[27:09]
that. The other question I have. Was on the airport
[27:13]
improvement fee for the operating request. It shows a dashed
[27:16]
line, but I think you had mentioned just verbally as
[27:18]
you were speaking to it is a 5.6 million. Revenue
[27:22]
for 2026. You'll worship.
[27:33]
Our expected revenue for AIF next year is around $35,000,000.35.
[27:38]
Okay, Mr. 30. Okay, thank you. Councilor Cannon, do you
[27:42]
have questions? Yeah, thanks, your worship. And I just wanted
[27:44]
to, first of all, say thanks. Congratulations. Your recent award
[27:48]
for the airport for your. Continued to lead in the
[27:51]
environmental initiatives and. I think it's incumbent to reinforce the
[27:56]
value of the airport from an economic perspective. I believe
[27:59]
it's about a 1.2% taxation impact. We garner from about
[28:05]
two and a half million dollars that you contribute to
[28:07]
the city general reserves. We thank you. Just had a
[28:09]
specific question. It's not addressed. In the budget. But I
[28:14]
wonder if there's any operational or capital budget implications as
[28:16]
a result of the third party cybersecurity incident that took
[28:19]
place at the airport back in October. Morning, Philip. Morning,
[28:24]
worship. Your worship through the councilor cannon. Yes. There will
[28:33]
be some additional operating costs in regards to that I
[28:37]
obviously can't get into the details of it. But what
[28:39]
I can tell you is that the corrective action plan
[28:42]
shows a number of items that are being addressed not
[28:45]
just at our airport but across Canada, but those items
[28:48]
are easily covered off in the existing budget, your worship.
[28:52]
Thank you. Thank you. We will now move into community,
[29:01]
safety and bylaw. Just before we start there, I just
[29:05]
want. To thank Mr. Samadar and all of the team
[29:10]
that are here. For the operational success of what they
[29:13]
do in running the airport. From behalf of the community,
[29:17]
we do truly appreciate it and thank you for being
[29:20]
here today. This presentation and thank you for what you
[29:22]
do in the success in running the airport. Thank you,
[29:27]
your worship. So we will welcome 1 second. Councilor Lovegrove.
[29:31]
Just 1 second, please. Before you leave, Councilor Lovegrove, please.
[29:35]
Thanks for worship. Councilor Wolverich, my apologies. No worries. I
[29:43]
just wanted to thank the team of the airport as
[29:44]
well. And I think what's important that obviously gets lumped
[29:47]
into our core budget. Here is the amount that is
[29:50]
spent on the airport that has no taxation demand, and
[29:53]
most of it is actually. Federally regulated for aviation. And
[29:58]
I think when we look through our binder, we question
[29:59]
certain items, but it does need to be acknowledged that
[30:02]
the upgrades that are requested are generally regulated federally, and
[30:06]
that's unique. To the city of Clonan with no taxation
[30:08]
demand. So thank you to the YLW. Team for all
[30:11]
the great work you do. Thanks for worship. Thank you,
[30:13]
Councilwich. Thank you. Very much. My apologies on missing that
[30:15]
on the light. Thank you very much. All right. Thank
[30:19]
you. Your worship will now move to community, safety and
[30:21]
bylaw and welcome the general Manager of People and Protective
[30:25]
Services, Mr. Stew Leatherdale. Good morning, sue. Good morning. Your
[30:32]
worship and council. So we're going to get into community
[30:36]
safety and bylaw services first. The key objective of these
[30:40]
groups. Are to maintain community standards as well as to
[30:45]
preserve and enhance safety. And, of course, a sense of
[30:48]
safety in our community. Bylaw services upholds community bylaw standards
[30:53]
through a delicate balance of education and enforcement, and the
[30:58]
branch consists of three different teams. Our general duty by
[31:01]
law officer. Officers, our encampment response unit, and our newly
[31:05]
formed informing investigative services team. The. Community Safety Services Branch
[31:12]
focuses more on crime prevention and crime reduction initiatives and
[31:17]
working on that sense of safety. A couple of key
[31:21]
accomplishments that I'd like to highlight. Include the community safety
[31:24]
plan. Again, which completed six and other six actions and
[31:28]
initiated nine this year. In total, 18 separate actions are
[31:33]
now on target to conclude before the five year strategic
[31:37]
plan. Sunsets next year. One of those community safety plan
[31:43]
initiatives, of course, is the recently announced. Two year crisis
[31:47]
response community led initiative for addressing mental health in the
[31:53]
community and assisting the RCMP that launched just recently here
[31:58]
with our partner, the canadian mental health association. Of course,
[32:03]
the marriage task force on crime reduction had a number
[32:06]
of successes, including the completion of the chronic offender advocacy
[32:10]
paper, which included calls to action both federally and provincially,
[32:15]
on criminal justice reform. Finally, our teams reimagine and restructured
[32:20]
our outdoor sheltering management strateg. Strategies with safety and security
[32:25]
in mind for city staff, for people sheltering outside, and
[32:29]
for the surrounding community. The new strategy is showing some
[32:33]
really amazing successes at transitioning people from outdoors into housing
[32:39]
in fact, this year, over 60 people have moved from
[32:42]
our designated site. Sheltering outside. Into other housing options and
[32:49]
shelters around the city. In the coming year, Bylaw will
[32:53]
finalize the implementation of their investigative services team. This is
[32:57]
a team of officers who tackle the most complex files,
[33:01]
including property and agricultural files, often in collaboration. With many
[33:06]
other city departments and other external agencies. Our new records
[33:13]
management system will be implemented as well for bylaw in
[33:17]
2026, which is expected to improve service and create a
[33:22]
new level of reporting and file management capability that is
[33:25]
quite long overdue for the branch. And we'll continue to
[33:30]
build on the bylaw officer training Academy to formalize a
[33:33]
higher standard of training for our bylaw officers. The training
[33:36]
is designed to reinforce consistent, credible, and professional service delivery
[33:43]
across. The community. Take a look at a few of
[33:47]
the performance measures for. The services performance measure number two.
[33:54]
Al Khan Tan which is the number of general duty
[33:57]
and encampment response service request. This measure helps us to
[34:02]
follow both the increased increase in demand as well as
[34:05]
the shifting nature of work for bylaw services. General duty
[34:09]
files typically require just a single officer to attend, whereas
[34:13]
encampment response files require at least two and often many,
[34:17]
many more bylaw officers to work on those files. This
[34:21]
year, bylaw services is actually projecting an increase of approximately
[34:25]
20%. In the number of files from 2024 due to
[34:29]
a very busy summer season, as well as increasing ways
[34:33]
that the public is able to access bylaw services, such
[34:37]
as additional online options. Performance measure number three is the
[34:41]
average number of days to close general duty and encampment.
[34:44]
Response service requests. Most bylaw files are complaint driven, and
[34:50]
they do vary quite a bit in complexity. So monitoring
[34:53]
the average days to close a service request is a
[34:56]
really good indicator of our overall responsive. Responsiveness and efficiency
[35:01]
of the service that we're providing to citizens. The target
[35:05]
was determined there internally to help drive. Citizen satisfaction results,
[35:10]
which appears in performance measure number one. And finally, caseload
[35:14]
per officer represents the workload on our bylaw officers, which.
[35:20]
Has actually decreased quite substantially in the recent years. As
[35:24]
a direct result of investments made by council. And with
[35:27]
that, I'll turn it over. To Ms. Antuns. Excellent. Thank
[35:31]
you, stew. So the community safety and bylaw service area
[35:36]
makes up $11.4 million of the city's overall expenditure budget
[35:41]
and is operated under three cost centers. The funding. For
[35:48]
the service area is predominantly property tax, with the addition
[35:52]
of some transfers from reserves and fees. And charges. The
[35:56]
2025 revised budget for the service area was $10,350,000. After
[36:05]
approved ad analyzing and adding the previously approved budget request,
[36:12]
The service area is starting 2026 within $9,300,000 budget. In
[36:18]
order for this service area to continue to maintain current
[36:21]
service levels, an additional $606,000 is requested. And enhancements of
[36:29]
$1.55 million is requested. The service area has three operating
[36:36]
requests, the first one being the bylaw service enhancements. This
[36:41]
request is for $251,000 in 2026, increasing to 282,000 ongoing,
[36:49]
and is recommended to be funded from the public safety.
[36:54]
Levy. This request does include one vehicle as a one
[36:57]
time. Expense in 2026. Second request is the enhanced business
[37:05]
improvement area services. This is $100,000 ongoing, funded from taxation,
[37:11]
but has been recommended to come out of the $500,000
[37:16]
that was originally allocated. For council's strategic initiatives. And the
[37:21]
third request is for $1.2 million in 2026 and 2027,
[37:27]
funded from reserve. There are no priority one preliminary request
[37:33]
for the capital program in the service area. Would council
[37:36]
like to discuss any of these requests. Thank you. I
[37:39]
do have a few questions, starting with councilor. Stock. Thank
[37:46]
you. Thank you for the presentation. My question is just
[37:48]
regarding the addition of two new bylaw officers. Stewart, as
[37:53]
you pointed out, there is a dramatic improvement in caseload
[37:56]
per officer. In the last two years. And my question
[38:00]
is, with the addition of two, is that essentially. To
[38:05]
man the department for growth. Deck our natural growth. And
[38:10]
the backside of that question is, is the bylaw department
[38:14]
number of officers appropriate. Now, for our city. Size now
[38:19]
that we caught up two years ago. Yes, your worship.
[38:26]
The additions to bylaw over the last number of years
[38:28]
has been for growth and also as a result of
[38:31]
council priorities. The two officers that were proposing this year
[38:36]
will round out. The two that were provided last year
[38:41]
specifically for a dedicated team in the Rutland area. With
[38:46]
regards to a target. We are approaching our target. For
[38:50]
what the bylaw team feels is the appropriate file per
[38:54]
officer load. We will monitor the file count as we
[39:00]
move forward. As mentioned, we are seeing some increases again.
[39:04]
This year. However, we're currently at target. At target. Good.
[39:09]
I think really worth emphasizing because we have done a
[39:11]
push these last few years to really strengthen our bylaw
[39:15]
team, and it sounds like we're actually getting to where
[39:17]
we want to. Be. And I'm encouraged to hear that.
[39:20]
Thank you, Councilor Hodge. Please. Thank you, Mr. Mayor, just
[39:25]
two generic questions for you. First of all, could you
[39:29]
just define encampment? What do you refer to? Cabinet responses,
[39:36]
et cetera. What qualifies as an encampment. You're worshipping. An
[39:44]
encambra would be where an individual. Arrests, a shelter, tent
[39:50]
or other shelter. In the community. So it's not necessary
[39:55]
to encampment. It's not like a tiny house. Or one
[39:58]
of the places that we put together. It's an accountant
[40:00]
that they put together. Correct, your worship. So it's an
[40:04]
individual erecting a shelter in the community it does not
[40:07]
refer to. Obviously any of our shelters, okay? People to
[40:13]
understand when they're trying to sort through it. And the
[40:16]
other point is just a formality for going through the
[40:18]
day. When you're going from page to page flipping the
[40:23]
boat, we put this manual I spent half my time
[40:26]
trying to find out where we are, and then by
[40:28]
the time I get there, you're on to the next
[40:31]
page, it'd be really helpful if you could say. Go
[40:33]
to page seven. Go to page nine. Thank you, your
[40:35]
worship. I'm searching around for. It. And then I get
[40:38]
there and you're off the next one. Damn. So I
[40:41]
just appreciate that. Thank you. Absolutely. Thank you. Thank you.
[40:44]
Councilor Cannon, please. Thank you. A couple of questions. One
[40:47]
is the 100,000 that enhanced business improvement area. How will
[40:51]
that be split between. Irba and downtunk, or is it
[40:56]
all going to. Your worship. The 100,000 is placement funding.
[41:04]
Coming out of the mayor's house. Force and crime reduction.
[41:06]
This was an initiative to bolster. And strengthen our bia
[41:12]
functions that are working there. So there is some work
[41:14]
to do. To determine exactly how to deploy those funds
[41:20]
next year to meet the objectives of the mayor's. Task
[41:23]
force. Yeah, I was a member of the mayor's task
[41:25]
force. That's why we didn't nailed it down. So I
[41:27]
was just wondering if you were able to. Get that
[41:28]
nailed down as how it's being split, but it's still
[41:30]
uncertain. Your worship. There is currently a policy. Which determines
[41:35]
the split for any of these BIa programs. So we'll
[41:39]
look at that. We'll look at other options. Training and
[41:43]
other options to try to support these BIA programs. Okay.
[41:46]
And with regard to. Last year we had looking at
[41:50]
our outdoor overnight sheltering and it looked at the request.
[41:56]
It was a request for 100,000 last year and then
[41:58]
200,000 this year. It was basically increasing by 100,000 each
[42:03]
year, so I'm not sure. It was overnight sheltering. Additional
[42:08]
ongoing budget is requested to address the impact, so there
[42:11]
must be a base budget and that we're adding to
[42:13]
it. 100 last year, 200 this year. So it's just
[42:17]
1.2 over and above the base budget. Yes, correct. So
[42:21]
what is the base budget then? The base budget is,
[42:25]
I believe, around. $500,000. And your worship for clarity. That's
[42:31]
materials and services. To help manage outdoor sheltering throughout the
[42:38]
community, not necessarily just at our designated site. And it
[42:42]
certainly does not include staff time or vehicles. This is
[42:47]
just peripheral equipment and services that are needed to help
[42:50]
manage this file. So at OS four. What do we
[42:54]
cost to be responsible for the 24 and the 424?
[42:58]
Seven security guards and. What else do we have? Correct?
[43:02]
So. We have obviously, rental of fencing in that area
[43:06]
under the current operation, security guards is a significant expense
[43:10]
under the current operation. Refuge removal. Washroom, cement, bullards, all
[43:16]
of the materials necessary to manage that area. Because you
[43:22]
mentioned you've had good success. I went by there yesterday
[43:25]
at 330 and accounted 26 people. Four security guards and
[43:29]
four BYL officers. At 330 in the afternoon. And what
[43:33]
I'm hearing from the community that designated outdoor sheltering site
[43:36]
offered, often referred to as those four. It's not reducing
[43:39]
illegal sheltering from taking place elsewhere in the community. It's
[43:42]
spread it all over. I've met with the merchants at
[43:44]
Willow Park Mall and Rotland. Peter Independent groceries Michael Neil
[43:49]
Mosaic book downtown kelowna so I don't think. It's working.
[43:52]
And I'd like to see OS four scale down rather
[43:54]
than putting. 1.2 million into this, or 1.7 altogether. Because
[43:58]
I'm compassionate, like all of us around this table. However,
[44:01]
I don't think what we're doing is working. This. Catching
[44:04]
a lease program is not working, and we need to
[44:07]
take a different approach, and so. We can get the
[44:09]
rail trail back to the citizens. And we added social
[44:14]
staff to our social team a couple of years ago,
[44:17]
adding more bylaw officers, I don't see this a productive
[44:19]
use of taxpayers money. And I noticed that our superintendent.
[44:24]
In the office, in the audience, and I'm just wondering
[44:25]
if I could make a motion. To hear from the
[44:28]
superintendent if he feels this is the best use of
[44:31]
our taxpayers money or if there's a better way that
[44:33]
we could address. This outdoor sheltering. And deal with the
[44:38]
homelessness in a more efficient way. Councilor. Thank you for
[44:42]
your comments. I'd like to make that as a motion
[44:44]
to hear from the superintendent, you, worship. Do we have
[44:47]
a seconder? All in favor? No. Opposed. Thank you. Well,
[44:56]
just. Counselor. It was passed and it was opposed. Your
[44:59]
worship. Sorry, I just want. To get clarity on. Counselor
[45:04]
Lovegrove and councilor Cannon. For everyone else opposed. Thank you.
[45:08]
Thank you. Councilor. That's the end of that motion. Thank
[45:12]
you. Thank you for cutting me off. Councilor Walbridge, please.
[45:16]
Thanks for worship. Pertaining to what's before us right now,
[45:19]
I. Just wanted a little bit more clarity on. Stu
[45:23]
on the Bia service improvements and councilor cannon went there
[45:26]
a little bit just in. A follow up. The 100,000.
[45:29]
I'm generally supportive of both the bylaw investments. And the
[45:32]
BIA service improvements. But just for clarity, DK fully funds
[45:38]
the clean team on their own through their requisitions from
[45:41]
their members. Is the plan that IRBA will do the
[45:44]
same in time. This is seed funding to get that
[45:46]
program up and running or what's the overall strategy? Your
[45:51]
workshop strategy to be determined early in the new year.
[45:55]
I can confirm clean team is one of the options
[45:57]
that our staff have heard from the bias. That are.
[46:00]
That's important service in the community. Do we fund the
[46:04]
DKA's clean team? Or is that all through their own
[46:06]
requisitions. No, your workshop. We don't fund the clean team
[46:10]
currently. Okay, so this. Would just be some seed funding
[46:12]
to get them off the ground, essentially correct. Thank you.
[46:16]
Councilor Weber, please. Yeah. I think last year in our
[46:20]
budget, we did do a significant increase for the business
[46:23]
improvement. Districts. Both downtown and in Rutland. So I'm curious.
[46:32]
Another $100,000. If there seems to be, there should be
[46:35]
a specific idea. Of what we needed for. But there
[46:39]
isn't yet. Just a point of clarification. I'm going to
[46:43]
ask the city clerk because it ended up being. It
[46:45]
was something that came before us, so I'm just going
[46:47]
to ask. For clarification on that with regards to that
[46:50]
direction, just so council is well aware of. Exactly what
[46:53]
we did on that one. Thank you, worship. As the
[46:56]
general manager alluded to, council. Has established a policy for
[47:00]
the funding for. Bias to support them. He may be
[47:05]
able to provide additional details in terms of that, but
[47:07]
the funding is intended to be following the direction set
[47:11]
out in that policy to continue supporting that work. Yeah,
[47:15]
actually it's. A policy I was referring to. They come
[47:17]
out with predictable funding for this group, and I'm just
[47:19]
curious whether this is part of that or something new
[47:22]
and improved in addition to. I will let stew speak
[47:24]
to that. Yeah. Your worship, the policy currently stands that
[47:29]
will support those programs with $100,000 or 25%. Of the
[47:34]
program costs. Our understanding is the mayor's Tas fours wanted
[47:39]
to revisit other ways that we could continue to support.
[47:45]
Those programs in the community to get them up and
[47:47]
running and viable and providing a good service. So in
[47:52]
order to do that, we need some funding to go
[47:54]
back. And think through the different options, whether it's clean
[47:58]
team or adjusting the formula or so. Forth. And obviously
[48:01]
we can come back to council with that review, with
[48:05]
the funding secured to implement. Councilor Weber. Just maybe a
[48:09]
little bit of clarification on that with regards to it.
[48:11]
There's different scales of time. That dka has had their.
[48:18]
Team in force and then Irba, with regards to looking
[48:20]
at establishing their time. So. The overall goal of it
[48:25]
is to make them both extremely, extremely successful within the
[48:28]
community. And who do needs potentially more assistance at this
[48:33]
particular point in time and making it successful for business
[48:35]
owners, and I believe what is being said. And stu,
[48:39]
please correct me if I'm wrong on it is that
[48:41]
there is a potential needs to look at assistance to
[48:44]
keep that going. Because we've seen the reduce in calls
[48:47]
that has to bylaw and RCMP officers. Dealing with those
[48:51]
situations. It's just a matter of where. And that would
[48:54]
be up to the team to say, which is, how
[48:56]
do we do that so that it's as successful as
[48:58]
possible. Well, because you appointed to me. I've been on
[49:03]
the downtown Columbia board now for over three years, and
[49:05]
I recognize. How much of their budget is going not
[49:09]
towards promotion of the downtown, but cleaning up and promoting.
[49:12]
And so. Certainly supportive of this help. So I wasn't
[49:17]
trying to make a question. No. And I was just
[49:19]
going for clarification. On exactly what it was. So I
[49:21]
truly appreciate. Your acknowledgment of the work that DK does,
[49:24]
their service is doing. What we couldn't do alone for
[49:27]
sure, and it's saving us a lot of money, and
[49:28]
it's costing them a lot of money, so I'm all
[49:30]
about that. One other question. Is the outdoor sheltering site
[49:34]
what councilor Cannon was saying? We've been hearing from the
[49:38]
city manager over the past year or two that. We're
[49:42]
spending a lot of money at that site, and it's
[49:44]
really not part of our municipal responsibilities, but we're doing
[49:47]
our best to keep the situation in control. In our
[49:50]
city. I don't think it would be up to somebody
[49:52]
like the RCMP. Commander to say is that money well
[49:55]
spent has nothing to do with law enforcement. It has
[49:56]
to. Do with the city trying to manage a problem
[49:59]
that's in our lapse. But at the other. Same time
[50:02]
we're trying to make changes to that camp and bring
[50:05]
down the cost. So I was a little surprised to
[50:08]
see it going up instead of down, because. We're trying
[50:11]
to reduce how much we're spending on it, so I'm
[50:12]
just curious what the plan is for that in the
[50:14]
future. Stupid. Yeah. The costs increase this year. With. The
[50:21]
new management strategy that we have there. As I mentioned
[50:24]
in my comments, we're seeing good successes all around, both
[50:29]
for individuals who are sheltering there as well as criminality
[50:32]
in the surrounding community and safety of staff. So the
[50:37]
plan is working. The costs are something, and the reason
[50:41]
why it's in as a two year request is because
[50:44]
we believe there's options to look at grant funding. There's
[50:49]
options to look at different ways to manage that while
[50:51]
still accomplishing the objectives. That we've set out. This year.
[50:57]
Thank you, council. Dehart, please. I just have a comment.
[51:01]
A comment? Okay. So this is an accepted motion. Direct
[51:06]
the board, please do your comment, and then we'll just
[51:08]
move from there. Thank you, worship. I just wanted to
[51:11]
make a comment on the continuous improvements. Because sometimes we
[51:14]
look at budgets and we're always looking at the numbers
[51:17]
and we don't read between the lines. Well, I'm sure
[51:19]
some of us do, but, I mean. Sometimes there's just
[51:22]
so much, but. I wanted to make a comment on
[51:25]
the establishment of an officer training academy, and I really
[51:29]
thought about that. And I think it's really important because
[51:32]
I think this is really critical to that department because
[51:36]
it's going to give the officers the tools to tackle
[51:39]
what actually council has asked for them to do in
[51:41]
our priorities of crime and safety. So I just. Wanted
[51:45]
to mention that it was just one little. Couple of
[51:46]
little lines in the budget, but I think it's so
[51:49]
important. And when we see our officers out there and
[51:51]
how they interact. With businesses, how they interact with the
[51:56]
homeless and how they interact with other people. I thought
[51:58]
this was one of the most crucial things and fully,
[52:01]
fully support that. Thank you. Thank you. Thank you. Thank
[52:05]
you. Second question. Councilor Hutch thank you, Mr. Matt. I
[52:11]
just wanted to clarify that on the previous motion. Presented
[52:16]
by Mr. Cannon. I agree with what he would say.
[52:23]
I just built up. To where it was. Counselor. The
[52:26]
motion failed. And it was. I was going to add
[52:29]
that. Mr. Merritt, I'm. Making a point that I think
[52:31]
are valid in the fact that. I didn't disagree with
[52:36]
what he was trying to accomplish. I think he's right.
[52:38]
I just didn't like the process at which he was
[52:40]
trying to accomplish it and that's why I made the
[52:42]
boat. I did. But I wasn't supporting what he was.
[52:45]
Saying it was just trying to get the RSMP to
[52:48]
make comment. At that time, I didn't think it was
[52:50]
a right fault. Thank you. I was just saying that
[52:54]
it ended be it. It wasn't something up for discussion
[52:56]
that. Was all counselors. Melanie. Anything else? To add. Note,
[53:03]
you, worship. We will then. Council is ready. We will
[53:07]
move. Into. There we go.
[53:17]
If I may, before you move into that particular area.
[53:21]
The bylaw service area has been extremely important to council.
[53:26]
And. The way that I believe. Initially the bylaw service
[53:30]
was structured when this council came in and the way
[53:34]
that bylaw services is structured now. Are two completely different
[53:39]
stories. And that's been at the hand of individuals like
[53:45]
Kevin Mead, that's been at the hands of individuals like
[53:48]
Darren Cole and now also Tory white that is in
[53:51]
there. And the efficiency with regards to the operation itself.
[53:59]
We are extremely grateful for. It obviously is a cost
[54:02]
that as a municipality. It's been put upon us to
[54:07]
deal with a lot of those issues. That we wish
[54:10]
that we didn't have to spend taxpayer dollars on, but
[54:14]
we need to do what we can in order to
[54:15]
try to make the community as safe as possible. So
[54:20]
in addition to those individuals I mentioned, Nick Bonnet, Ken
[54:24]
Hunter and Kevin Dugan. I just truly want to appreciate
[54:28]
the work that they have done to get this organization
[54:32]
to the point of being as efficient as it can
[54:35]
for the needs of our community. And hopefully there is
[54:38]
a day that we don't need this cost at Os
[54:41]
four and we don't. Need these other costs within our
[54:43]
community, and I'd be very grateful when they kind of.
[54:46]
Trim down substantially. But until that time, we recognize that
[54:50]
we need our part to do our part in order
[54:52]
to try to keep our community as safe as possible.
[54:54]
So just very grateful for the work that they do
[54:57]
and the work that you do in helping them along.
[54:59]
Thank you, your worship. So we'll next move into police
[55:03]
services in RCMP. This section starts on page 10. Five
[55:08]
of your budget volume. All right. Thank you. Mel the
[55:16]
key objective of this service, of course, is to preserve
[55:20]
and enhance public safety in our community. And also to
[55:25]
support longer term strategies to address the demands on police,
[55:29]
such as addressing upstream determinants of crime. Or efforts to
[55:34]
improve efficiency through innovations. The RCMP is our contracted policing
[55:39]
agency are supported by over 100 City of Kelowna employees
[55:44]
who deliver 24/7 operational support. Such as preparing documentation for
[55:51]
criminal court proceedings, completing administrative duties for RCMP members so
[55:56]
that they can spend more time working directly with the
[56:00]
community, conducting investigations for lower level RCMP calls, ensuring good
[56:06]
communication with our citizens and running some. Really important community
[56:10]
safety initiatives such as event planning, volunteer management, and the
[56:15]
reintroduction. Of our auxiliary program. Some key accomplishments throughout the
[56:22]
year include. The significant improvements in RCMP and police services.
[56:34]
Stopping levels. The vacancy rate has dropped substantially this year
[56:39]
and is providing a good benefit to the community. The
[56:43]
reintroduction, of course, of our speed watch program as well
[56:47]
as the auxiliaries. Who are now hired, and they're busy
[56:50]
completing their training this fall. We also had a major.
[56:55]
Body camera rollout for our local RCMP officers. And we
[57:00]
added the RCMP, added a dedicated community liaison for Rutland,
[57:06]
and increased the number of school resource officers from two
[57:10]
to four. And finally, while our city has been an
[57:13]
advocate for change, on the impact of chronic offenders. The
[57:16]
RCMP have really prioritized enforcement with. These individuals in our
[57:21]
community. Looking forward to next year. Our primary work will
[57:25]
be to implement the RCMP modernization recommendations, which began last
[57:30]
year with our detachment formerly being reorganized from a regional
[57:35]
mandate to focus solely on Kelowna. Next steps are to
[57:39]
transfer the administrative services to each of. Our regional partners,
[57:44]
and as we undertake that work, our police services leadership
[57:47]
team will initiate an organizational effectiveness review to help determine
[57:52]
that our current complement of municipal employees. And the structure
[57:57]
aligns with operational needs of the RCMP that they support.
[58:02]
Finally. A good successor. Detachment was able to complete a
[58:06]
CCTV upgrade project for cameras outside of the building with
[58:11]
existing funding last year, and we'll be moving on to
[58:16]
upgrading CCTV cameras. Within the detachment in 2026. On the
[58:22]
slide are some key performance indicators that I will touch
[58:26]
on. Performance measure number one, citizen. Satisfaction with police services.
[58:32]
The 2024 data did show an improvement from 2022, from
[58:35]
74% to 80% favorable. We expect to maintain that result
[58:39]
going into next year and have established. A target of
[58:43]
83% favorable, which represents the Ipsos provincial average from 2024.
[58:50]
Performance measure number two is response time. Please response to
[58:54]
calls for service in minutes. The targets for party one,
[58:58]
two and three calls are eight minutes, ten minutes and
[59:02]
20 minutes, respectively. These targets were selected after reviewing historical
[59:08]
data, the city of Kelowna and cross referencing with provincial
[59:12]
benchmarks. The 2026 forecast takes into account a number of
[59:17]
fact. Factors, including the growth of the RCMP of specialized
[59:20]
units beyond just the front line and also the implications
[59:24]
of FIFA coming up in 2026, which could limit our
[59:28]
ability to bring in additional officers for summer operations. Performance
[59:34]
measure number three is citizen callbacks for. Police police service
[59:39]
calls, which is a measure of responsiveness and is one
[59:44]
of council's four top priorities for the RCMP that we
[59:49]
established earlier. Since 2023, when the KPI was adopted. The
[59:53]
RCMP have emphasized this area and improved from 43%. In
[59:59]
2022% to 77% in 2025. And we've set a target
[1:00:03]
of 90% for that measure. On this slide, we have
[1:00:08]
traffic safety, police enforcement interactions, which does show a drop
[1:00:13]
in 2025. Due to operational demands, including some investigations on
[1:00:19]
some very complex collisions. However, traffic services I understand is
[1:00:25]
realigned recently to better meet enforcement objectives going forward and
[1:00:31]
the RCMP and the city have also established a multi
[1:00:35]
agency traffic safety. Committee. The last one. I'll just quickly
[1:00:39]
touch on performance. Measure number five is caseload per. Officer.
[1:00:45]
Which is like, by law. A very good indicator of
[1:00:48]
the demand for police services and the workload on our
[1:00:51]
officers in the past few years, Kelowna's caseload per officer
[1:00:55]
typically has been about 33% higher than the provincial average
[1:01:00]
for communities with more than 15,000 residents. However, significant council
[1:01:06]
invest. Investments since the past few years means that case
[1:01:10]
load officer has improved quite dramatically, and we're forecasting it
[1:01:15]
to be down to 71 files per officer, which will
[1:01:18]
be the best in eight years. We are continuing with
[1:01:22]
Mr. Cal to do some analysis on this measure. With
[1:01:27]
the eye to come back to council early in 2026
[1:01:30]
to really establish what our target will be for caseload.
[1:01:34]
With that, I'll turn it over to Ms. Anthoons. Thank
[1:01:38]
you. So police services in RCMP budget makes up $83.2
[1:01:43]
million of the city's overall $1 billion budget and is
[1:01:47]
operated under several different cost centers. The recommended funding strategy
[1:01:53]
is the predominantly property taxes, with the inclusion of $6
[1:01:57]
million of other revenue, $6 million of transfers from reserves,
[1:02:01]
as well as some fees and charges. The 2025 ending
[1:02:08]
revised budget is. 75,935,000. After annualizing previously approved budget requests.
[1:02:19]
The service area starting 2026 at 75,400,000. To maintain current
[1:02:26]
service levels, an additional $7,259,000 is being requested. And enhancements
[1:02:36]
of $500,000 $501,000 are requested. The service area has three
[1:02:43]
budget requests starting on page 112 in the budget volume.
[1:02:48]
The first one is for child and youth advocacy center
[1:02:53]
enhancements of $58,000 ongoing, funded 11,500 from partnering municipalities. And
[1:03:02]
46,300 from taxation. Next is the DNA analysis service fee
[1:03:08]
of $33,000, ongoing, funded from taxation. And the third is
[1:03:13]
police services in RCMP enhancements. This is for four additional
[1:03:19]
regular members, one police services, financial analysts. This request is
[1:03:25]
a total of 349,300 in 2026, increasing to 1,144,250 ongoing.
[1:03:35]
The recommended funding is for three regular members. And the
[1:03:39]
financial analyst to be funded from the public safety levy
[1:03:42]
and the one additional. Regular member to be posted at
[1:03:47]
the airport to be funded 80% airport and 20% taxation.
[1:03:52]
Which is $12,700 in 2026, increasing to 50,700 of taxation
[1:03:58]
ongoing. There are no preliminary. Sorry. There is no priority
[1:04:03]
one capital request for this service area. Would council like
[1:04:09]
to discuss any of the priority one budget request? Thank
[1:04:12]
you. Yes, there are a few questions. Councilor Singh, please.
[1:04:15]
Thank you, worship. Stu, I just want to speak to
[1:04:18]
the one. On the child and you advocacy center. It
[1:04:22]
is a well funded center in the sense there's a
[1:04:25]
lot of donation money that comes there. 58,000 in the
[1:04:29]
grand scheme of life isn't a huge ask. What is
[1:04:33]
it? 46,300. I wonder if you could speak to what?
[1:04:38]
The money. Is required for is there demand for. Police
[1:04:43]
services at the center. Has that gone up dramatically or.
[1:04:48]
Is it? More complaints coming in. What is the situation?
[1:04:52]
Your workshop. This budget request is to help support. The
[1:04:57]
Child and family advocate program within the CYAC. This is
[1:05:01]
a group of employees who provide a wide variety of
[1:05:04]
service, and they also provide. Support and service to. Our,
[1:05:09]
for our CNP members that are working there. All right.
[1:05:12]
Also, then can I just move on. To. I totally
[1:05:16]
appreciate the work they do. I just wanted to question
[1:05:19]
it, get an answer as to why, if I could
[1:05:23]
go to page 113. Am I wrong? Isn't the airport
[1:05:28]
the rcmp? Person who member who's at the airport. Isn't
[1:05:35]
it someone who's either a retired member or an auxiliary?
[1:05:39]
Or is it? A paid full time member who's stationed
[1:05:42]
at the airport? No. It's a regular member. All right.
[1:05:47]
Okay. Thank you. Thank you. Councilor stock, please. Thank you.
[1:05:51]
Thank you, Stewart. So just regarding our new additional members
[1:05:54]
to the RCMP, we're looking for four this year. To
[1:05:58]
looking at the budget of 68 four. I'm assuming those
[1:06:00]
would be anticipated to start. Later in the year. Is
[1:06:03]
that correct? Is there a target date for that? Yes,
[1:06:06]
your worship, date. RCMP officers. We typically plan to hit
[1:06:10]
the budget in Q four just because it does take
[1:06:13]
some time to work its way through the process. So
[1:06:15]
does this give you the placeholder to. Go to the
[1:06:18]
rcmp depot. To select these candidates. Is there availability? And
[1:06:25]
what's the likelihood of the four being added to the
[1:06:27]
staff next? Year physically. Your worship, my understanding is deposed
[1:06:32]
doing much better than years gone by. So we are
[1:06:35]
confident they'd be added by Q four as a plan.
[1:06:39]
Maybe a bit earlier, a bit later. But we're confident
[1:06:42]
they'll be added. Okay, good. And second, this is just
[1:06:46]
kind of a personal curiosity. We have 100 city employees
[1:06:50]
that support our officers in the field. When we look
[1:06:54]
at the way they're captured in our budget are those
[1:06:58]
100 city of Kelowna employees. Like would they be on
[1:07:01]
the city of colonial payroll? Correct your. Just like all
[1:07:05]
others is part of our compliment. Okay, but when we
[1:07:09]
look at the funding of our RCMP division. Are they
[1:07:13]
included in that budget category? Depending on what number. You're
[1:07:18]
looking at, whereby no Mr. Zas and Ms. Antoons have
[1:07:21]
talked about the RCMP contract. That would just be what
[1:07:25]
we paid to the RCMP for our contracted policing service.
[1:07:29]
There's also budget line items for all of the rest
[1:07:33]
of the support services. The facility, support employees, as we're
[1:07:38]
obligated to do under the municipal police unit. Agreement. Okay,
[1:07:42]
so I interpret that all of this would be considered
[1:07:44]
part of our RCMP. Policing services. We phrase it as
[1:07:49]
that. And the RCMP contract is one of those line
[1:07:52]
items in that correct. Okay. Thank you. And would it
[1:07:56]
be fair just to answer that councilor's question that it's.
[1:07:58]
Approximately about 20%. To your worship. Would it be fair
[1:08:03]
that when to answer the council's question, that it's. Approximately
[1:08:06]
about 20% of our overall line item. Somewhere in that,
[1:08:10]
Mr. Sass. More. 25. That's more than that, Mr. Sass.
[1:08:16]
Thank you, worship. Have to look that one up. The
[1:08:17]
team's just checking on that, right? Now. Okay, thank you.
[1:08:20]
Next. Councilor. Councilor Lovegrove. Yeah. Just clarification. So the funding.
[1:08:29]
For. The member that will be at the airport. That's
[1:08:33]
coming from the airport. I'm sorry, can you repeat? Sorry
[1:08:38]
for jumping in there. The member that's going to be.
[1:08:43]
Stationed more often at the airport. Where was the funding
[1:08:46]
for that member going to come from? Would that be
[1:08:47]
the airport improvement fee? You, worship. The airport members are
[1:08:51]
shared 80% out of airport funding and 20% out of
[1:08:55]
taxation. And yes. They will be solely stationed at the
[1:08:59]
airport, serving the airport area and. How many members are
[1:09:03]
we talking about total? They currently have one, and they're
[1:09:08]
moving to two. Moving to two. Okay, thank you very.
[1:09:12]
Much. I guess just a general comment on this. Just
[1:09:16]
reading this look like a maintain, not an enhancement. I
[1:09:19]
know we've been having fuzzy. Discussions about what's what, so
[1:09:22]
just leave it at that. I was reading this thing,
[1:09:24]
this. Looks like just managing growth. Thank you, councilor. Mr.
[1:09:28]
Sass, now that you've done that research, just answer that
[1:09:31]
question, please. Thank you. Your worship. Yes, 20% is approximately
[1:09:34]
the right number, and I just want to make a
[1:09:36]
clarification. Around the funding for this. I don't believe the
[1:09:40]
AIF this would be considered eligible. Funding, but it is
[1:09:44]
funded through other revenue streams at the airport. I just
[1:09:46]
want to make that clear, because I don't believe that
[1:09:48]
that would be eligible under the AIF program. Thank you,
[1:09:52]
Mr. Sass, for that clarification. Councilor Cannon, please. Thank you,
[1:09:55]
worship. Just a. Supplemental to councilor. Singh's question on the
[1:10:00]
child's youth admission center. You worship myself or involved in
[1:10:03]
that, and it's a great service. So will that be?
[1:10:05]
Ongoing, then their baseline budget will be increased to 121,000.
[1:10:10]
You, worship. The request is for just under 58,000. And
[1:10:16]
yes, it'll be ongoing funding. And eleven five. So that's
[1:10:19]
revenue that be generated. From other municipalities or using the
[1:10:24]
services. Sorry, workshop. I'm not seeing where you're looking. For
[1:10:32]
other revenue. Oh, yes, your worship, exactly. That recoveries from
[1:10:39]
our partner municipalities. Fabulous and councilor stock, thanks for your
[1:10:44]
question on the RCP. That's where I was going. I
[1:10:45]
just know that's going to be a busy year for
[1:10:47]
them, as you mentioned, with FIFA. And going to host
[1:10:51]
a memorial cup and bc lions games and bc summer
[1:10:54]
games. Appreciate the work of a men and women in
[1:10:57]
uniform. Thank you. Thank you. You have a comment, please,
[1:11:02]
council Dehrt. We'll go to comments, and then we'll move
[1:11:07]
it forward. Please. Thank you. I just wanted to make
[1:11:11]
sure that the citizens of Kelowna know one of the
[1:11:14]
most. Significant changes. And I know, stew, you brought it
[1:11:17]
up. Was the change from a regional to our. Municipal
[1:11:21]
operations in the RCMP. I know I've been asked about
[1:11:24]
it, but I'm. Really not sure if the average everyday
[1:11:27]
public understands about it and how important. It is and
[1:11:31]
how much of a change it's going to make to
[1:11:33]
our city, so. I just wanted to bring that up.
[1:11:36]
Thank you. Stu, please, if you have comments on that.
[1:11:44]
No worship. That work has been going on for some
[1:11:46]
time. We're very excited. To be moving in that direction,
[1:11:51]
and I absolutely believe. It will have a great impact
[1:11:55]
on. Services. Our OIC who's here today, and his inspectors
[1:12:00]
will be solely focused on Kelowna. Issues. So I think
[1:12:03]
it's good, and it'll be good for the region. As
[1:12:05]
well, because our municipal partners will have their own OIC
[1:12:09]
and begin to staff up appropriately. In their area, so
[1:12:12]
I think it's a huge win for the region. Thank
[1:12:16]
you. Just a point of. Clarification there, and I was
[1:12:18]
speaking with city manager on it from a standpoint of
[1:12:21]
it is RCMP that are representing our community, not municipal
[1:12:25]
like they're representing Kelowna. With regards to RCF. Just don't
[1:12:28]
want to get kind of caught up in that wording
[1:12:29]
structure on differences in between it. Seeing nothing else. Council.
[1:12:37]
Please. This service area has one priority to request. This
[1:12:42]
is. For two regular. Rcmp members. We'd like council like
[1:12:47]
to discuss this priority to request. Seeing that. I'm looking
[1:12:50]
for council to look at moving this forward. I'll just
[1:12:54]
move ahead. No good. Thank you. We'll move into fire
[1:12:58]
safety now. Fire safety. We'll just hold for 1 second,
[1:13:02]
please. Obviously, superintendent. Chris Cable, who is now our new
[1:13:07]
superintendent alongside Darren Cole. We know that you have come
[1:13:12]
into our community and made substantial changes with regards to
[1:13:15]
the organizational structure of the operation. And working towards making
[1:13:20]
this community a much safer place. And for your work
[1:13:24]
and your team's. Work. We truly appreciate the efforts that
[1:13:27]
you're doing. What we recognize, we see more activity out
[1:13:31]
there, and that is because. Of the digging in that
[1:13:34]
you're doing to working on making this community safer, so
[1:13:37]
just. On behalf of myself and council superintendent and also
[1:13:40]
Mr. Cole, thank you for your work. One more. Please.
[1:13:49]
Okay. Thank you. We will now move into fire safety.
[1:13:53]
This is start on page 116 of your budget volume.
[1:13:58]
Thank you, Mel. The key objectives of the fire department
[1:14:01]
are to provide effective fire protection and public safety. For
[1:14:05]
all areas of the city. Services provided by the department
[1:14:08]
include fire suppression who respond to fires in the community,
[1:14:12]
along with urgent medical calls, mpas and other calls like
[1:14:15]
Hazmat and rescue incident. They also have the fire prevention
[1:14:20]
branch, which does their work through inspections and public education.
[1:14:24]
Fire m. Mitigation who are working with community partners on
[1:14:28]
preventing wildfires and engaged in some exciting and innovative technology.
[1:14:34]
And we also have emergency planning, which includes. Preparation, response
[1:14:39]
and recovery plans for a variety of emergencies that could
[1:14:43]
arise within the community. KFD also, as you're aware, manages
[1:14:48]
one of the largest dispatch centers in BC, serving 58
[1:14:52]
departments, as well as various other clients in the Okanagan
[1:14:55]
and in. The southern southeastern BC. Key accomplishments for fire
[1:15:02]
safety. Fire department include the update of the fire strategic
[1:15:07]
plan was an important document to get over the line.
[1:15:10]
Also finalizing the fire facilities. Master plan to lay out.
[1:15:15]
How we will grow in the future. When appropriate, completing
[1:15:19]
the design and beginning the construction of the new Glenmore
[1:15:22]
protective Services campus is. Very exciting for everybody at the
[1:15:26]
department. And we're also happy to report that six Kelowna
[1:15:30]
neighborhoods have now achieved their fire smart recognition. Fire smart
[1:15:35]
neighborhood recognition. In the coming year, KFD will begin implementation
[1:15:41]
of their updated strategic plan. The work towards improved data
[1:15:47]
tracking and reporting across all departments continue to strengthen innovation
[1:15:52]
and partnership with organizations working on wildfire detection and response
[1:15:57]
and expand the fire smart neighborhood program. With 26 additional
[1:16:03]
neighborhoods in the community. Looking at performance measures. Performance measure
[1:16:09]
number one is fire inspections, which are completed both by
[1:16:12]
the fire. Prevention Branch, dedicated employees as well as our
[1:16:16]
on duty firefighters. Between these groups, our target is to
[1:16:20]
complete 5200 inspections a year based on building ris. Risk
[1:16:26]
levels. Performance measure number two is our dispatch center call
[1:16:30]
response time, which is currently meeting our target of answering
[1:16:34]
with 90% within 10 seconds. Number three is effective response
[1:16:40]
time and effective response force, both of which are showing
[1:16:44]
some gains over the past few years based on council
[1:16:47]
investment and continuous improvement initiatives by the department. Effective response
[1:16:53]
time refers to how quickly the fire department first apparatus
[1:16:58]
arrives on scene. While effective response force measures our ability
[1:17:03]
to quickly assemble three engines in one commander, a total
[1:17:06]
of 13 staff to a structure fire. Currently, the target
[1:17:11]
for response time is to arrive within nine minutes, 90%
[1:17:15]
of the time for all types of emergencies and a
[1:17:18]
target for effective response. Force will be set through council
[1:17:22]
workshops in the coming year. Two other measures that we're
[1:17:26]
following are suppression calls per population where Clona is slightly
[1:17:30]
above the average compared to five comparable BC communities and
[1:17:35]
firefighters on duty per population, where we're below average, but
[1:17:40]
also have seen some improvements with the investments made by
[1:17:43]
council. To get that additional squad in our downtown hall.
[1:17:50]
Recently. And that concludes my comments. And over to Ms.
[1:17:53]
Ante. So fire safety. As a budget of $78.4 million
[1:18:01]
and is operated under five different cost centers. The funding
[1:18:07]
for the service area is predominantly property taxes and transfers
[1:18:12]
from reserves, but also includes some grant funding, fees and
[1:18:15]
charges and other revenues. The 2025 revised budget. Is
[1:18:24]
$42,324,000. After annulating previously approved budget request, we're starting 2026
[1:18:32]
at 36,530 6,560,000. To maintain current service levels, an additional
[1:18:42]
$37,000,475 is requested and enhancements of $4,335,000 are also requested.
[1:18:53]
This area. Has three operating requests starting on page 125,
[1:18:59]
and also one request for operating and maintenance impacts from
[1:19:04]
capital. The first request is fire safety enhancement. This includes
[1:19:10]
four firefighters and incidental cost. This request is in 2026,
[1:19:16]
$368,000 and will increase to a full annualized cost of
[1:19:21]
537,000 ongoing and it is recommended funded from the public
[1:19:26]
safety levy. Second request is for KFD fleet repair costs.
[1:19:31]
This is $180,000 ongoing, funded from taxation. And then the
[1:19:37]
KFD service support enhancement of 54,000 in 2026, increasing to
[1:19:44]
$107,000 ongoing, funded from taxation. The operating. And maintenance impacts
[1:19:54]
from the capital program is $415,000 in 2026, increasing to
[1:20:00]
492,000 in 2027. Ongoing funded from taxation. The capital program
[1:20:08]
for 2026 is in full alignment with. The ten year
[1:20:13]
council approved tenure capital plan. Is there any priority one
[1:20:17]
request that council would like? To discuss. We have questions.
[1:20:22]
Councilor Singh, please. Discuss. My question to Mr. Leatherdale is
[1:20:32]
you said in your presentation, we are below. The national
[1:20:37]
average for five others. In comparison to the population, I
[1:20:42]
do believe we have approximately 130 to 135 fighters full
[1:20:48]
time. Five fighters for a population of 165,000. That's sort
[1:20:54]
of way under. The national standard set. For community safety.
[1:21:04]
And I'm just wondering, the four firefighters we had agreed
[1:21:07]
to in the public safety levy. Some time ago. That
[1:21:12]
additional two firefighters. Wouldn't. That still put us under the.
[1:21:18]
National standard. So, if so, my question really is, why
[1:21:22]
is that priority too? Shouldn't that have been priority one.
[1:21:27]
You were. Maybe for clarification. The performance measure that we're
[1:21:32]
following is. Following. Comparable communities. Within BC. There are NFPA
[1:21:40]
standards out there which are essentially an agreement of fire
[1:21:44]
personnel. About ideas around North America where a variety of
[1:21:48]
elements should. Be. We are under the average for the
[1:21:53]
five comparable communities in BC. I will mention we do
[1:21:59]
have targets to increase that over the span of a
[1:22:03]
few years. All communities are quite different as well. You
[1:22:08]
wish, but I'd see if we could start that item.
[1:22:13]
For now. And open it for discussion towards the end,
[1:22:18]
because in the summertime we are like a tinderbox. And
[1:22:23]
I think there's a method to my madness. But I
[1:22:27]
think at the end of the day, it's worthy of
[1:22:30]
a discussion if we could start that and revisit it.
[1:22:33]
It is starred. Thank you, your worship. We will need.
[1:22:36]
A council resolution to do that. So if you want
[1:22:40]
to accept councilor Singh as moving that we will need
[1:22:43]
a second. All in favor? So we're starring basically priority
[1:22:49]
two with regards to the number of recommended that is
[1:22:53]
in the budget with respect to the advancement. Of. The
[1:22:59]
fire department to a higher level. You worship. Just for
[1:23:02]
clarification, just to be very specific, the motion would be
[1:23:05]
that council. Star the firefighters two. So for two additional
[1:23:09]
firefighters, item on page 130 for further discussion later in
[1:23:12]
the meeting. Thank you. So this was moved by councilor
[1:23:16]
Singh, seconded by councilor Woolridge. All in favor? Opposed. So,
[1:23:24]
basically. It was. Stock. Weber and myself and everyone else
[1:23:32]
in favor. Just to start, this is starring. So it
[1:23:36]
is starred. Thank you for that, Councilor Singh. Councilor Wolverich,
[1:23:43]
please. Thanks for worship and happy. To start that for
[1:23:46]
further discussion at the end of the day, just to
[1:23:47]
keep the day moving. Stu, just for clarity, as part
[1:23:52]
of the 2025 strategic plan, From the fire department. Can
[1:23:56]
you remind me? There was a ten year capital and
[1:23:58]
staffing forecast. Associated with that plan. Originally. It would be
[1:24:06]
helpful to know, as we discussed, the priority too that's
[1:24:09]
been raised. How we're doing in terms of keeping up
[1:24:12]
over that ten year staffing plan. Do you know if
[1:24:15]
we'll have that? Yeah. Your workshop in the strategic plan.
[1:24:22]
It identified the need to establish a service level. To
[1:24:26]
come back to a council workshop and talk about. The
[1:24:31]
response times and the effective response force and the related
[1:24:35]
costs of changes to those service levels. So there is
[1:24:38]
not a ten year stopping plan in that it's subject
[1:24:41]
to the next. Review. Okay. And then was that part
[1:24:44]
of the 2026 workshop that you mentioned early on in?
[1:24:49]
Your preamble, correct? Yes. Okay, so the strat time was
[1:24:52]
completed, and the next piece of work, the strap plan
[1:24:57]
outlines. Many different factors of services by the fire department.
[1:25:01]
The next piece of work is to determine. Where that
[1:25:05]
service level will be at in response time, which will
[1:25:08]
feed the staffing plan. Okay. That'll be really helpful to
[1:25:11]
know as we debate that item. Thank you. Thank you,
[1:25:13]
councilor. Cannon, please. Thank you, worship. Thanks. Mr. Loved. Just
[1:25:16]
a question. Key performance measure number one, fire. And life
[1:25:20]
safety inspections. I know the fire safety act was changed.
[1:25:25]
A year and a half ago, August of 2004. And
[1:25:29]
there's some different ways. Of enforcing. The whole risk compliance,
[1:25:34]
but I'm just wondering. Your forecast, it's almost a 50%.
[1:25:37]
Increase for number inspections anticipated next year versus over this
[1:25:41]
year. It's been pretty level for the last year and
[1:25:46]
a half, but this is going up. 50%. Yes, your
[1:25:49]
worship. The number one driver behind the increase is we
[1:25:56]
did suffer from some staffing issues. Due to unexpected medical
[1:26:01]
absences this year. That's great. No, it's good to see
[1:26:04]
that. Thank you. Hope they're better. And they're all coming
[1:26:07]
back. That'll help the safety. Of our community. Thanks. Council
[1:26:11]
stack, please. Steve, when we're looking at the addition or
[1:26:15]
the new Glenmore. Fire hall and training center. We'll be
[1:26:23]
closing the existing one, and then those staff will move
[1:26:25]
to the new one. Is that correct? That's correct. And
[1:26:28]
in the new one, is there an expanded number of
[1:26:30]
staff anticipated for that. And does the current plan. Staff
[1:26:35]
up for those, if required. Your worship. It'll be a
[1:26:39]
lift and shift. It'll be the same number of staff.
[1:26:42]
However, the new Glenmore Protective Services campus is being built
[1:26:47]
on a much longer timeline and will have the ability
[1:26:50]
to expand at some point in the future, but initially.
[1:26:54]
It's the same staffing compliment. Okay, so under the current.
[1:26:59]
Request and not talking about the priority too. But under
[1:27:01]
the current plan, we will have the appropriate level of
[1:27:04]
staff built for that at the time of its opening
[1:27:07]
and for our overall department, correct? Thank you. Thank you.
[1:27:12]
Fire services has two priority two requests. The first one
[1:27:17]
of the two additional firefighters has been start for further
[1:27:20]
discussion later in the day. And there is one other
[1:27:22]
one for the KFD. Officer development training of $50,000 ongoing,
[1:27:27]
funded from taxation. Would council like to discuss the second
[1:27:33]
item? Seeing none. All right. We will thank Mr. Leatherdale.
[1:27:39]
And next, welcome the general manager. 1 second, please. Just
[1:27:46]
to Chief Seymour and Deputy Chief Watson, thank you for
[1:27:48]
being here and thank you for the work you do
[1:27:50]
within the community. Obviously, the controlled burns that you've initiated
[1:27:54]
throughout the community. And the work that you've done. Has
[1:27:58]
been extremely, extremely grateful. So thank you for both being
[1:28:00]
here, and thank you on behalf of all of us,
[1:28:02]
to all your team, for the work that you do
[1:28:04]
throughout the community, very much. Appreciate it. Council, we are
[1:28:06]
going to take a five minute break, please. Thank you.
[1:42:13]
Thank you. Just want to look at calling this meeting
[1:42:21]
back to order. Thank you. I'm just going to get
[1:42:26]
the city clerk to start it. Just waiting a little
[1:42:30]
extra minute there. Thanks, Melanie. Thank you very much. City
[1:42:32]
clerk, please. Thank your worship. We are. Now moving to
[1:42:36]
item seven on the agenda. And this is the wastewater.
[1:42:44]
Utility service area. Thank you. Thank you. So as the
[1:42:49]
city clerk just mentioned, we are moving into wastewater utility.
[1:42:52]
This is on page 131. Of your budget volume. And
[1:42:57]
we will welcome the general manager of infrastructure, Mr. Mac
[1:43:00]
Logan, to present. Welcome, Mr. Logan. Thank you, your worship.
[1:43:04]
It's my pleasure to walk council through the multiple services
[1:43:08]
that the. City of colonial provides in these essential services
[1:43:13]
that maintain the high quality of life that we enjoy.
[1:43:16]
And depend on in this wonderful city. I'm supported here
[1:43:19]
today by Kevin Van Bleet. Our manager of utility services,
[1:43:23]
along with his individual service area managers. The wastewater utility
[1:43:29]
had a number of key accomplishments in 2025. Council can
[1:43:35]
read. So I won't read all of these, but I'll
[1:43:37]
highlight what they mean to us with respect to service
[1:43:40]
provision and budget. We have completed a comprehensive condition assessment
[1:43:44]
of the wastewater treatment plant, which we will use to
[1:43:48]
build our renewal and upgrading plans on a goforward basis
[1:43:52]
to make sure that this critical facility continues to operate
[1:43:55]
efficiently and reliably for years to come. This year also
[1:43:59]
saw the completion of a three year program. To provide
[1:44:02]
a sewer connection to 600 existing homes in the Rutland
[1:44:06]
neighborhood, a project that helps owners with aging septic systems
[1:44:11]
not have to worry about replacing those systems, as well
[1:44:13]
as supporting the urban renewal within this neighborhood. In 2025,
[1:44:19]
we finished a project with the District of Lake country
[1:44:22]
to treat the affluent. Coming from their plant through the
[1:44:26]
city of Colonos system before its return to Lake Okanagan.
[1:44:30]
And finally, I'd like to highlight. The completion in 2025
[1:44:34]
of the water security plan, which encompasses all aspects of
[1:44:38]
our community's. Use of water and outlines our goals and
[1:44:41]
objectives to protect the system over the long term. Switching
[1:44:46]
to our continuous improvement and looking forward. The public service
[1:44:50]
can never rest on its accomplishments and we continue to
[1:44:53]
refine and improve the services we deliver. I mentioned the
[1:44:56]
wastewater treatment plant assessment we now have moved out. We've
[1:45:00]
now moved forward to modeling our future demands and working
[1:45:03]
out how we can meet. The growth and changing affluent
[1:45:08]
characteristics to ensure that we protect Lake Okinawgan when we
[1:45:12]
discharge our treated water into it. Our sanitary lift station
[1:45:16]
program continues with next year's highlight being the completion of
[1:45:19]
the water. Street lift station. This positions the city for
[1:45:23]
the growth in the north downtown area, including the redevelopment
[1:45:26]
of the Tolco site. You will see in our capital
[1:45:29]
budget that the RV Sandy dump request that council put
[1:45:32]
forward has been included in our capital budget plan as
[1:45:35]
well. We continue to renew aging sewers in residential and
[1:45:40]
commercial areas and in certain locations we are combining these
[1:45:43]
with street upgrades. A final highlight is the work that
[1:45:47]
the wastewater team is putting forward to reduce the inevitable
[1:45:51]
odors that our facilities unfortunately generate, especially as more and
[1:45:55]
more development pops up around them. Our wastewater performance metrics
[1:46:01]
assess a number of things. First, How much available. Capacity
[1:46:06]
does our plant have? That's performance metric one. That's what
[1:46:09]
it's telling us? Secondly, are we replacing enough of our
[1:46:13]
pipe network to maintain the reliability and minimize breaks? This
[1:46:17]
is an area that we have advised council that our
[1:46:19]
spending needs to be increased and our capital plan reflects
[1:46:22]
this. Third, we're providing the essential services. This essential services
[1:46:28]
at a cost that families can afford. You will see
[1:46:32]
in the lower left on performance metric three that our
[1:46:34]
costs have been increasing gradually. Over time. But when you
[1:46:37]
look at performance metric four, it's clear that we're providing
[1:46:40]
this service at the lowest cost of a city within
[1:46:44]
the Okanagan and amongst the lowest across the province. I
[1:46:49]
will now pass the presentation back to the financial planning
[1:46:52]
manager. Thank you. The wastewater utilities operating expenditure budget is
[1:46:58]
$65.9 million for 2026. The utility is operated under several
[1:47:06]
different cost centers. The funding strategy for this service area
[1:47:12]
is predominantly transfers from reserves and fees and charges the
[1:47:16]
majority of funding in the reserves actually is from future
[1:47:20]
year or previous years. Fees and charges there are also
[1:47:24]
some other revenues. The 2025 revised budget.
[1:47:34]
It was $63 million 115,000 after annualizing previously approved budget
[1:47:42]
requests, the utility is starting 2026 at 18 million. Dollars.
[1:47:48]
To maintain current service levels, an additional 44,600,000 is being
[1:47:54]
requested, and to enhance service levels. An additional 3,250,000 is
[1:47:59]
being requested. This utility has three operating requests starting on
[1:48:08]
page 140. The first request for network roadway Worksafe
[1:48:17]
requirements is $120,000 ongoing, funded from the utility. Second is
[1:48:23]
the sanitary and stormwater network integrity programs, at $150,000 funded
[1:48:29]
from utility. And the third being the wastewater collection operations.
[1:48:34]
Additional expenses due to growth at 132,000 in 2026, increasing
[1:48:40]
to 168,000 ongoing. The capital program in the wastewater utility
[1:48:46]
is in full alignment. With the council adopted ten year
[1:48:51]
capital plan. Does council have any priority one request? They
[1:48:56]
would like to discuss. Thank you. Seeing none. Then we
[1:49:04]
will move into stormwater and flood protection starting on page
[1:49:08]
146 of your budget volume. Councilor Cannon. Your light was
[1:49:18]
not on when I looked at it. You have a
[1:49:21]
question on? I wasn't. Sure she's going through each one,
[1:49:23]
but two quick ones on the hall road area. Contact
[1:49:27]
by some people that are wondering. Looking at sewer connection
[1:49:31]
areas. So that's just the connections that would be eligible
[1:49:36]
because of. The mission Creek landing expansion. It wouldn't be.
[1:49:40]
Additional homes and other parts of the road network in
[1:49:43]
that neighborhood, is that correct? Good morning, Kevin. Thank you
[1:49:47]
very much. Utility sewer connection areas. I believe it's the
[1:49:57]
sewer connection area is on page 144. Thank you. Yes,
[1:50:01]
the wastewater connection, the sewer connection area program. Has a
[1:50:06]
prioritized list. Hall road is on that list, but it
[1:50:08]
is. Down quite a ways. So. The focus this year
[1:50:16]
is primarily as it relates to Hall Road is getting
[1:50:19]
the sewer pipe that tied into. The seniors facility there
[1:50:25]
across Mission Creek. That's why I thought. Okay, thanks. And
[1:50:29]
as far as the recreation vehicle, the RB standing disposable
[1:50:33]
facility. Do you have a specific location in mind? Yes,
[1:50:38]
your worship. Thank you. Council did request that we look
[1:50:41]
at a sandy dump facility and ask for us to
[1:50:45]
put that in budget for consideration this year. Staff looked
[1:50:48]
at twelve locations that were owned and operated by the
[1:50:52]
city that we had control over. We also did hear
[1:50:55]
from a couple of private property owners that could be
[1:50:58]
interested in hosting one. I personally talked to two properties
[1:51:02]
and gave them some feedback so have not yet heard
[1:51:05]
back. If they are still interested. This budget would fund
[1:51:10]
a site on Crowley at the north side of our
[1:51:13]
branch Creek wastewater treatment. Plant. We also, the second best
[1:51:17]
site that we have would be on Joe Rich Road,
[1:51:20]
but the budget proposed here would not be able to
[1:51:22]
fund that. We chose sites that we already own the
[1:51:26]
land. Because if we have to purchase land for sandy
[1:51:29]
dump, there's no way it would be economical. Thanks, Ann.
[1:51:32]
I've been in contact with those two. Private individuals are
[1:51:35]
still interested. Thank you. Thank you. Seeing. No further questions.
[1:51:42]
Then we will now move into the stormwater and flood
[1:51:45]
protection. Service area on page 146. Thank your
[1:51:54]
worship. Now, like to highlight some of the key accomplishments
[1:51:57]
from stormwater and flood protection. Team in 2025. We have
[1:52:01]
completed a plan for the central area stormwater basin. This
[1:52:05]
plan enables the city to plan for our growth while
[1:52:09]
ensuring that the stormwater runoff from new impervious areas. Can
[1:52:14]
be safely managed to avoid flooding and excessive impacts to
[1:52:17]
the quality of our streams in lake the team has
[1:52:21]
also completed the assessment condition assessment of 103 storm ponds
[1:52:25]
without our system. So. I thought council might be surprised
[1:52:29]
to see that number. How many storm ponds we have.
[1:52:33]
These inventory and condition assessments provide an overall picture of
[1:52:36]
the state of our infrastructure, and we use this to
[1:52:39]
develop a dashboard for the system and inform our capital
[1:52:42]
renewal plans during 2025. Work was also undertaken on 15
[1:52:46]
stormwater projects, summer construction. But many are at the design
[1:52:50]
phase with construction plan for. 2026. Next year, the stormwater
[1:52:57]
team will be moving forward with the condition assessment and
[1:52:59]
inventory work to develop programs to efficiently invest in dams,
[1:53:03]
ponds, pipes, and culverts that best address. Our community's needs,
[1:53:09]
and we plan to reestablish the stormwater gauge program. Which
[1:53:13]
was shut down a number of years ago. And finally,
[1:53:16]
we will be studying the street sweeping program's impact on
[1:53:19]
stormwater quality to better understand how we can efficiently and
[1:53:22]
effectively protect lake coconagin by collecting the material before it
[1:53:26]
enters the storm sewer, and that's sand and the chlorides
[1:53:30]
that come. With our winter road maintenance. Looking at the
[1:53:35]
performance metrics in the stormwater area, the first performance measure
[1:53:39]
is the quality of the water in the creeks that
[1:53:41]
feed Lake Okanagan. We are forecasting this performance. Measure to
[1:53:46]
remain constant. Next is the measure of the wastewater performance.
[1:53:50]
That is the percentage of the existing system that we're
[1:53:54]
replacing on. An annual basis. Our target is 1.33%, which
[1:53:59]
represents an average lifespan of 75 years for the stormwater.
[1:54:02]
Asset the following capital plan. In today's budget improves on
[1:54:07]
recent years as we see the need to increase the
[1:54:10]
investment. In this asset renewal program. Performance measure three simply
[1:54:14]
reports on how well we are delivering on servicing all
[1:54:17]
of our catch basements. To avoid local area flooding and
[1:54:21]
to remove debris from these pipe before it reaches the
[1:54:24]
lakes. The final metric is how well are we doing
[1:54:26]
at servicing all of the non catch basement assets in
[1:54:30]
the network. You can see from both performance metric three
[1:54:33]
and four the recent arrival of a new VAC truck
[1:54:35]
is delivering improvements towards our service level targets, and we
[1:54:38]
have an additional unit. Coming online soon. I would now
[1:54:42]
like to hand the presentation back to the financial planning
[1:54:45]
manager. Thank you. The stormwater and flood protection service area
[1:54:51]
has. A service area expenditure budget of $14.9 million and
[1:54:58]
it is operated under four cost centers. Funding for. This
[1:55:04]
service area is predominantly from transfers from reserves and property
[1:55:08]
taxes, with additional funding from grants and other revenues. 2025
[1:55:14]
revised budget is 15,254,000. And after annualization of previously approved
[1:55:22]
budget requests, the service area is starting the year at
[1:55:26]
a budget of 2,967,000. To maintain current service levels. The
[1:55:33]
service areas requesting $6,046,000 and to enhance service levels. It
[1:55:39]
is requesting $5,931,000. The service area has one priority one
[1:55:48]
operating request found on page 154. For utility infrastructure planning.
[1:55:56]
This request is $87,000 in 2026, increasing to $170,000 ongoing.
[1:56:05]
And. Is funded. 25% from the water utility, the wastewater
[1:56:11]
utility, solid waste and stormwater. With stormwater being the taxation
[1:56:17]
portion. The capital program for this service area is in
[1:56:22]
complete alignment with the council adopted ten year capital plan.
[1:56:26]
Is there any request that council would like to discuss
[1:56:28]
further? Council, Dehart. Thank you, worship. Mac, I just wanted
[1:56:37]
to ask you, and I don't. Remember. And maybe I
[1:56:39]
shouldn't remember. But you said you're going to reinstate. The
[1:56:42]
stormwater gauge program. Why? And when was that shut down?
[1:56:46]
And now? We're going to reinstate it. Can you just
[1:56:49]
talk about that a little bit, councilor? Dehart through the
[1:56:52]
chair. I think Mr. Van Blee is best able to
[1:56:54]
answer that. Thank you, worship. At one time, we had
[1:56:59]
quite a number of rankages on our SCaDA system. That
[1:57:04]
due to costs as well as some internal transfers, we
[1:57:07]
reduced some of those. We still have some rain gauges
[1:57:11]
and the mention there is really that we are trying
[1:57:13]
to within our existing. Funding start to reestablish them because
[1:57:18]
they provide excellent data for us to help drive. Data.
[1:57:23]
Good data driven decisions. But we're not asking for additional
[1:57:26]
funding at this time, okay? Good. Because I think that's
[1:57:30]
quite important. I think. In stormwater and flood protection. I
[1:57:35]
would say that is quite important to have that data.
[1:57:39]
Yes, you, worship. It is important. And that is something
[1:57:42]
that you're looking at improving over. Time. Thank you, Councilor
[1:57:46]
Lovegrove. Please. Yeah, thanks to worship. Actually, I fully support
[1:57:49]
the proposed. Budget items. I just have a question. On
[1:57:53]
the 2025 key accomplishments, and I appreciate. The infrastructure manager
[1:57:59]
highlighted the Stormwater Pond Asset renewal program study that was
[1:58:02]
done. I'm just wondering. You say that to better understand
[1:58:06]
our stormwater management ponds. From a risk based asset management
[1:58:11]
and GIS lens. Was there also a climate lens applied
[1:58:14]
there? I mean, ponds are also looked at as potentially
[1:58:18]
wetlands. Given our climate change that we're experiencing, was that
[1:58:23]
looked at or will that be looked at at some
[1:58:25]
point. Yes, your worship. Climate change is impacting the amount
[1:58:29]
of stormwater that we receive, and so. We are looking
[1:58:33]
at all of our stormwater infrastructure from that lens that
[1:58:37]
the amount of rainfall we're getting in the summer and
[1:58:39]
in the winter is changing, increasing generally in the winter.
[1:58:43]
And that is part of all of our stormwater management
[1:58:46]
is that. The new paradigm that we can anticipate. Thank
[1:58:50]
you. So you're going to need more. Last, is there
[1:58:53]
a recommendation on that study? That we can look at
[1:58:55]
at some point, or is it being represented? And I
[1:58:57]
just forgot about. It. I apologize if I did. It
[1:59:01]
has not yet been presented. We're still in the process
[1:59:03]
of evaluating the assets. Their condition. Part of it is
[1:59:07]
lifecycle. How do we renew a storm pond? Over time,
[1:59:12]
storm ponds will fill up with debris and silt. Et
[1:59:15]
cetera. And how do we manage them, especially if they've
[1:59:17]
become a wetland? And there's critters living in them, et
[1:59:19]
cetera. So. We're at the early stages of that program,
[1:59:23]
and we have not reported any details back. To council
[1:59:26]
yet. Okay. I really appreciate that answer. Thank you, worship.
[1:59:29]
Council Cannon, please. Thank you, worship. Okanagan Basin waterboard. We
[1:59:33]
just had a five hour strategic plan, and it was
[1:59:34]
a big issue as far as. Performance measurement number one,
[1:59:38]
protect the Oakland and lake by minimizing the contaminants. In
[1:59:41]
the creek so that protecting the watershed so. I really
[1:59:46]
see appreciate the efforts you're doing. To minimize the impact,
[1:59:50]
whether it's through development or climate change. My question is
[1:59:53]
on page 155. The flood Protection Mill Creek budget is
[1:59:57]
requested to continue the seven year program. So what year
[2:00:01]
are we into the seven year program? Thank you. Councilor
[2:00:05]
Hodge, please. I know the answer is in here somewhere,
[2:00:13]
but I look far enough. I think that's the adventure.
[2:00:17]
Look at the numbers. Measure number one. The grid that
[2:00:25]
shows the protection leak by minimizing contaminants. And the torque
[2:00:31]
and. Most of the time in the 30s, which is
[2:00:35]
fair. But in 2014, we're down to 22, which is
[2:00:40]
pretty good. Why is that number there amongst all the
[2:00:44]
lower number that are rail? You worship a lot of
[2:00:49]
this. This is a performance measure that we've made in
[2:00:52]
house. Taking data from nine different creeks. Three different aspects.
[2:00:59]
And my technical expert is not here. He's somewhere in
[2:01:03]
the United States. But I can. Assure you that it's
[2:01:06]
very likely just a data driven the quantity quantity of
[2:01:10]
data that we had at that time. It says, judge.
[2:01:13]
A dramatic shift from all the other ones on the
[2:01:15]
chart. Maybe it's a flunder, but. There's no particular. Yeah,
[2:01:20]
I suspect that's more of a data anomaly at this
[2:01:23]
time, but I can really. Look back. I guess I
[2:01:26]
have a habit of finding anomalies. There we are. All
[2:01:29]
right. Thank you. Melanie, please. Thank you, your
[2:01:38]
worship. We will now move into the water utility and
[2:01:42]
I will pass it back. To Mr. Logan. Thank you,
[2:01:46]
Mel. Looking at this year's accomplishments in the water utility,
[2:01:50]
I would like to reiterate the completion of the water
[2:01:53]
security plan. And say a particular thank you to Rod
[2:01:57]
McLean. Council has seen us refer to this program during
[2:02:01]
our various presentations, and it represents a foundational document to
[2:02:05]
preserve and protect this most important of natural assets. In
[2:02:10]
2025, the team from the Glen irrigation. District began their
[2:02:16]
transition to become part of our utility, and I'm happy
[2:02:19]
to stay with no impact to customers and. Excellent staff
[2:02:23]
retention. Out of the public eye. Our team has also
[2:02:27]
been improving the. Quality of water treatment at the El
[2:02:31]
Dorado and McKinley water supply points. With the introduction of
[2:02:36]
sodium hypochloride treatments of the supply, which reduces the risk
[2:02:40]
to our staff, the environment and the public, and in
[2:02:44]
numerous locations around Kelowna, we've been upgrading and renewing the
[2:02:47]
city Ngid water networks, including along Glamor Road north, which
[2:02:52]
we have just wrapped up for the year and are
[2:02:54]
about to start next. Year's program. Looking at how we're
[2:02:58]
improving the quality and reliability of our network. We've applied
[2:03:03]
more advanced computer analysis of our water network to identify
[2:03:07]
the optimal locations and frequency for system flushing. We've been
[2:03:12]
incorporating Giid into our city water utility, which also means
[2:03:16]
integrating our systems. And developing tools for Gid that inform
[2:03:22]
their maintenance programs. We were successful in receiving a small
[2:03:26]
grant of 25,000 to develop a new asset. Assessment for
[2:03:30]
the GID system. Finally, council, I would like to highlight
[2:03:34]
the ongoing program to replace and upgrade critical water supply
[2:03:38]
mains in 2026, the program will focus its investment on
[2:03:42]
the pipe that links the McKinley reservoir. To other areas
[2:03:45]
of the network, as well as continuing to replace water
[2:03:48]
pipelines along the glamour road. Looking at the performance metrics
[2:03:53]
in the water utility. The water utility does a great
[2:03:58]
deal of testing and monitoring, and as a result, we
[2:04:00]
have no problem demonstrating our performance to colonial citizens. Please
[2:04:05]
note that we have updated several of these performance metrics
[2:04:08]
to include the Gid system. Performance measure number one demonstrates
[2:04:14]
that water quality almost always meets water guidelines with limited
[2:04:17]
quality warnings for a variety of reasons, such as turbidity.
[2:04:21]
Performance metric two demonstrates that we continue to produce our
[2:04:26]
targeted water supply, and I also find it interesting that
[2:04:29]
if you look at the five years on this report,
[2:04:32]
we've maintained a fairly continuous amount of consumption, even while
[2:04:36]
our population has been growing. Performance metric three shows water
[2:04:41]
main brakes, and that is important is that it inflicts
[2:04:44]
a supply disruption on customers. And while Gid is commendably
[2:04:49]
low, We do see a number that the city would
[2:04:52]
hope to increase with or would hope to improve. On
[2:04:55]
with our increased investment. In replacement. Performance metric four and
[2:05:01]
five. Repeat our observation that the current level of renewal
[2:05:05]
spending is below the recommended long term goals, so we're
[2:05:07]
gradually improving that and performance metrics. Six demonstrates that. Kelowna's
[2:05:13]
water utilities, delivering safe and reliable supply of both drinking
[2:05:17]
and non potable water at one of the lowest rates
[2:05:20]
within british. Columbia. And now we'll pass it back to
[2:05:22]
the financial planning manager. The water utility has an operating,
[2:05:28]
sorry, an expenditure budget of $93.9 million and is operated
[2:05:33]
under several different cost centers. Funding for this utility is
[2:05:40]
predominantly from reserve funding, fees and charges, and borrowing. With
[2:05:44]
the addition of some other revenues and grants. The 2025
[2:05:50]
revised budget for the utility is 52,164,000. After annualizing previously
[2:05:57]
approved budget request. The utility will start the 2026 year
[2:06:02]
with a budget of 25,484,000. To maintain current service levels,
[2:06:10]
an additional 65,970,000 is requested. And to enhance service levels.
[2:06:16]
An additional 2,412,000 is requested. This service area has three
[2:06:23]
priority one operating request, and they start on page 166
[2:06:28]
of your budget. Volume. The first is the dam safety
[2:06:32]
program. It starts at 72,000 in 2026, increasing to 140,000
[2:06:39]
ongoing. Next is the network road safety. Requirements at $60,000
[2:06:46]
ongoing and the third being water operations at 77,000 in
[2:06:50]
2026 increasing 247,000 ongoing. The water utility capital program for
[2:07:00]
2026 is mostly in alignment with the ten year Capital
[2:07:04]
Plan with the exception of the codable water Network Growth
[2:07:09]
and renewal program, Where we have included in the last
[2:07:17]
budget amendment report. An advancement of $1.5 million in the
[2:07:23]
water meter replacement program and the deferral of 300,000 for
[2:07:27]
the potable PRV renewal program. Is there any request that
[2:07:32]
council would like to discuss further? Council. Weber. Weber, please.
[2:07:38]
I see that we're going to be spending a lot
[2:07:40]
of money in the next few years. As you mentioned,
[2:07:42]
the capital in the capital request potable water network growth
[2:07:45]
and renewal and water treatment, growth and renewal. 22. $23
[2:07:50]
million. This coming year and then more to come, and
[2:07:54]
it's coming from reserve, various reserves, and borrowing. I'm just
[2:07:58]
curious how that comes to be. As opposed to there's
[2:08:01]
nothing. Listed for taxation. Thank you, your worship. As this
[2:08:07]
is the water utility, it is operated as a self
[2:08:10]
funded area using utility fees and charges to fund this
[2:08:14]
as opposed to property taxation. So I guess the question
[2:08:18]
is, when you're borrowing money, is that a cost that
[2:08:20]
would be prevented if you were doing it some other
[2:08:22]
way. Thank you, your worship. At the time of borrowing,
[2:08:26]
we will look at the different options that we have
[2:08:29]
for borrowing. We could borrow city funding and funded ourselves
[2:08:35]
internally. Or we will look at MFA funding and then
[2:08:38]
return to council to ask for approval on borrowing that
[2:08:40]
way. Thank you. We're just going to go to Mr.
[2:08:46]
Sas, please. Thank you, worship. It's a good question. The
[2:08:50]
utilities are actually one of the areas because. We build
[2:08:53]
such long range, large infrastructure that really lend itself well
[2:08:56]
to. Debt financing, as opposed to raising rates today to
[2:09:04]
fund that significant infrastructure. It's also important to note that
[2:09:07]
these are not taxation funded areas and so they don't
[2:09:11]
hit things like our tax supported debt service ratios and
[2:09:14]
things like that. So it's actually a very opportune place
[2:09:17]
to utilize debt to be able to facilitate the investment
[2:09:20]
in infrastructure. Requ. Required. Thank you. And we've learned from
[2:09:24]
Mr. Sass that we're bringing in. More money on our
[2:09:26]
investments and having money in the bank than it costs
[2:09:28]
us to borrow money. So it's only more efficient. It's
[2:09:32]
not like I was sitting here going, let's put it
[2:09:33]
on the tax bill. That wasn't my point of my
[2:09:35]
question. Seeing. No further questions. Thank you. Thank you. We
[2:09:41]
will next move into solid waste in landfill. This starts
[2:09:45]
on page 172 of your budget volume. Thank your worship,
[2:09:52]
and it's my pleasure. To round out the utilities with
[2:09:56]
our solid waste management line of service, and I often
[2:10:00]
tell citizens that. Ask me what I do. Say I
[2:10:04]
make sure when you turn on your top, you've got
[2:10:05]
drinking water. When you flush your toilet, it goes away
[2:10:08]
somewhere and gets properly treated, and we come and collect
[2:10:10]
your garbage. Once a week. So I consider these the
[2:10:13]
fundamental services that we often take for granted, but. The
[2:10:18]
city does seamlessly and very cost effectively. In 2025, the
[2:10:23]
Glenmore landfill area three. Liner was completed and began to
[2:10:27]
accept waste. This was a major capital project and was
[2:10:31]
completed without disrupting the operation of the landfill. The result
[2:10:35]
is a significant increase in the capacity of the site
[2:10:38]
to accept waste from our growing region. And speaking of
[2:10:42]
the region, working with RDCO, we supported the evaluation. Of
[2:10:46]
further organics waste diversion. While we did not ultimately implement
[2:10:50]
a full program at this time, we did learn a
[2:10:53]
great deal about the region's organic waste production and the
[2:10:56]
options to divert that reusable material from the landfill. And
[2:11:00]
I would like to highlight that we've begun the construction
[2:11:03]
of a diversion of the stormwater in the Glenmore valley
[2:11:06]
around the. Landfill. And what that does is maintains the
[2:11:09]
quality of the water. Entering Brance Creek and traveling through
[2:11:12]
Kelowna towards the lake. And finally. Our ongoing fleet modernization,
[2:11:17]
the reduction of climate impacts. We have now have our
[2:11:20]
first fully electric front. End loader in service at the
[2:11:23]
landfill. Looking at our continuous improvement measures in 2026, the
[2:11:30]
solid waste team will continue our work on a system
[2:11:32]
to pretreat the fluids that leach out from the landfill
[2:11:35]
before they entered the wastewater collection and treatment system. This
[2:11:40]
helps protect and maintain. The performance at the water treatment
[2:11:44]
plant. We're beginning the crushing of waste concrete and asphalt
[2:11:50]
to generate a renewable aggregate for new concrete in Asheville,
[2:11:53]
and that's a really effective way to put that material
[2:11:56]
back on. The street and keep it out of the
[2:11:58]
landfill. It's also, I would highlight found that it's a
[2:12:02]
dimensionally stable material and you can use it in wet
[2:12:05]
conditions and get back to construction more quickly. We're implementing
[2:12:10]
an online booking system so that contractors dropping off drywall
[2:12:14]
can do so. At a scheduled time. And drywall is
[2:12:16]
something we definitely want to keep out of the landfill.
[2:12:18]
It produces. Some. Undesirable byproducts. And finally, we are continuing
[2:12:25]
to gradually electify our operation, with next year's focus being
[2:12:29]
removing the diesel power from our composting equipment. Solid waste.
[2:12:34]
Performance measures cover a variety of ways. We assess how
[2:12:37]
well we are serving the city. Performance metrics number one
[2:12:41]
and two monitor how well our societal programs are at
[2:12:44]
reducing waste and diverting waste. You can see that in
[2:12:49]
post Covid waste generation is stable. Perhaps an area we
[2:12:53]
continue to seek community improvement. Performance metric three demonstrates that
[2:12:57]
we are capturing and using an increasing amount of landfill
[2:13:01]
gases. Performance metric four demonstrates that organic waste generation is
[2:13:07]
also relatively stable relative to the household waste collection so
[2:13:12]
even though our population is increasing, That is staying stable,
[2:13:16]
which may reflect that we have higher intensification abuse on
[2:13:19]
a given lot. And now I'd like to hand the
[2:13:22]
presentation back to the financial planning manager. So these solid
[2:13:26]
waste in landfill service area has an expenditure budget of
[2:13:30]
$38.9 million. And is operated under three cost centers.
[2:13:40]
Funding. For this service area is predominantly fees and charges
[2:13:45]
and transfers from reserves. The 2025 revised budget was $43,260,000.
[2:13:56]
After annualizing previously approved requests, we will start 2026 at
[2:14:00]
a budget of 27,970,000. To maintain current service levels and
[2:14:07]
additional 10,085,000 is being requested and to enhance service levels.
[2:14:12]
$850,000. This service area has two priority one operating requests
[2:14:20]
that are on page 181, first one being landfill emissions
[2:14:25]
monitoring at 110,000 ongoing and the second being. Landfill operations
[2:14:32]
for 133,000 in 2026, increasing to 137,000 ongoing. The 2026
[2:14:42]
Capital Plan for this service area is in 100% compliance
[2:14:46]
or alignment with the council approved ten year capital plan.
[2:14:50]
Are there any individual requests that council would like to
[2:14:52]
discuss further? Seeing none. Thank you. Thank you. We will
[2:15:00]
next move to the transportation service area. Starting on page
[2:15:04]
184 of your budget volume. Thank you, worship. Continuing with
[2:15:10]
the infrastructure division, we're now at transportation. I may tell
[2:15:16]
them about water, sewer and garbage. They usually ask me
[2:15:18]
about transportation. As council is well aware, our ability to
[2:15:22]
move people around Cologne is easily one of the top
[2:15:25]
concerns of residents, businesses and visitors. During 2025, there's been
[2:15:31]
a record level of investment in maintaining, expanding and efficiently
[2:15:35]
operating our system. A few highlights include. The record level
[2:15:42]
of resurfacing that we did this year all over the
[2:15:44]
city. It was about $5.3 million, I believe, at year
[2:15:47]
end. We had. A number of major road projects completed.
[2:15:52]
These included a new roundabout and roadway connection at Frost
[2:15:55]
Road and Shoot Lake and a second roundabout completed on
[2:16:00]
Valley Road. A new program in 2025 for the reconstruction
[2:16:05]
of inner city roads. Was undertaken. We completed three roads
[2:16:10]
this year, and these projects take existing roads. They add
[2:16:14]
curb and gutter and introduce stormwater. They repave the roads.
[2:16:19]
They renew the utilities and they prepare the streets for
[2:16:21]
the completion of the envisioned urban renewal. We typically are
[2:16:25]
selecting roads where the urban renewal on the street is
[2:16:28]
about 50% and expected to continue to develop. We've also
[2:16:33]
put a significant amount of our current budget towards the
[2:16:36]
design of major road projects which will show up in
[2:16:40]
the 2026 capital budget for construction. The future projects, our
[2:16:45]
future projects include two new road segments, one at North
[2:16:49]
Hollywood Road to support the future transit garage. And also
[2:16:53]
the land exchange deal from the Colonial Springs Golf Club,
[2:16:57]
as well as the extension to the south, a birch
[2:16:59]
road from Gushigan down to Klo. Looking at our continuous
[2:17:03]
improvement. We've introduced a suite of new policy advancements. The
[2:17:11]
department is following on from the city's accessibility strategy. The
[2:17:15]
Jim Gabriel's team delivered to create an accessibility strategy specifically
[2:17:20]
focused on the transportation network, and the council will see
[2:17:23]
that report in the first quarter of 2026. We've just
[2:17:28]
completed the safe mobility action plan, which council will see
[2:17:31]
at next Monday's. Meeting and this response to council's priority
[2:17:35]
to improve the safe operation of our transportation. Network. In
[2:17:40]
2025, we commenced a review of the downtown transportation system,
[2:17:44]
and we will complete that work. Mid 2026. The Downtown
[2:17:48]
transportation review will help identify the key function of each
[2:17:51]
of the roadways. In our city center and inform the
[2:17:53]
design. For future developments that are occurring adjacent to those
[2:17:57]
roads, and one of the best value for money. Projects
[2:18:00]
that we delivered in 2025 was the implementation of smart
[2:18:04]
signal management along Springfield Road that pilot program. Demonstrated, had
[2:18:11]
a successful demonstration, and the value of this type of
[2:18:14]
an approach was clearly articulated. Our next phase of signal.
[2:18:20]
System management is currently in the testing phase along enterprise
[2:18:24]
and will and additional sites will be identified around the
[2:18:27]
inner city to be installed in the coming year and
[2:18:30]
beyond. The transportation department reports on six performance metrics at
[2:18:36]
this time. Performance metric one tracks the injury rate on
[2:18:40]
a per capita basis. We can see a steady, positive
[2:18:46]
downward trend. Council will hear more about this at next
[2:18:49]
Monday's. Council report, so I won't get into that. Performance
[2:18:52]
metric two is a measure of how our development, our
[2:18:56]
growth and population is showing up as congestion on our
[2:19:00]
key roadways. We recognize that it's a balance between expanding
[2:19:06]
roadways and the cost associated with that. With accepting a
[2:19:09]
certain amount of congestion that comes along with intensification of
[2:19:13]
the inner city. Performance metric three and four speak to
[2:19:17]
enabling travel by means other than driving a car. By
[2:19:21]
adding the missing sidewalk and providing safe cycling routes in
[2:19:25]
the inner city. Both metrics show that our current level
[2:19:28]
investment is improving and the situation is gradually improving. Performance
[2:19:33]
metric five. Measures the overall pavement quality. And this is
[2:19:38]
something that. We do. About a third of the city
[2:19:42]
each year is measured and we set a target for
[2:19:45]
about. A performance quality of about 60, and we're at
[2:19:50]
67, so we're slightly above. Our target and it informs
[2:19:53]
the investment in our repaving program. And finally, performance metric
[2:19:58]
six is a measure of how well we are able
[2:20:01]
to clear all of the snow and ice control how
[2:20:04]
well we are able to clear all of the roads
[2:20:06]
after snow. Events. And this is a balance, again, between
[2:20:10]
the cost of providing that service. And. The public expectation
[2:20:15]
on how quickly their roads are addressed. And I'll pass
[2:20:19]
it back to the financial planning manager. Thank you. The
[2:20:23]
transportation service area. Has an expenditure budget of $117.6 million
[2:20:30]
and is operated under several cost centers. The funding for
[2:20:37]
this service area is predominantly made up of transfers from
[2:20:40]
reserves, property tax, and borrowing. The 2025 revised budget was
[2:20:48]
116,298,000. After annualization of previously approved budget requests,
[2:20:58]
the service area will start the year at 23,765,000. To
[2:21:05]
maintain current service levels, an additional 84,179,000 is requested. And
[2:21:11]
to enhance service levels, an additional 9,670,000. This service area
[2:21:20]
has four operating requests prior to one operating request. Starting
[2:21:23]
on page 193 of your budget volume first being bike
[2:21:29]
path sweeping and litter and debris, starting at 275,000, increasing
[2:21:35]
to 295,000 in 2020. Seven and $315,000 ongoing, funded from
[2:21:42]
taxation. The gravel operations. Clean fill removal in 2026 of
[2:21:48]
$450,000 funded from reserve sidewalk inspections and furniture repair for
[2:21:55]
$103,000 ongoing, funded from taxation and transit litter at $60,000
[2:22:03]
ongoing. Funding from taxation. The 2026 capital program is in
[2:22:10]
alignment with the council approved ten year capital plan. But
[2:22:14]
at this time, staff would like to make a recommendation
[2:22:18]
to have the Wrbennet Bridge dynamic lighting. Request on page
[2:22:23]
202 be deferred to. Future years. Thank you. Anything
[2:22:33]
to add to that, I do have boarding on a
[2:22:35]
resolution for that particular. Please just share us the wording
[2:22:38]
at the moment. Thank you, worship. So, just following up
[2:22:40]
on staff's. Recommendation for removal of the bridge. I do
[2:22:48]
have resolution wording should council wish to advance that recommendation.
[2:22:53]
So that would be that. Council remove the Wrbent bridge
[2:22:56]
dynamic lighting, p. One item on page 202 from the
[2:23:00]
2026 financial plan, volume one preliminary budget with no impact
[2:23:04]
on taxation, and that council direct staff to further evaluate
[2:23:07]
opportunities to. Add dynamic lighting along the bridge for future
[2:23:10]
consideration. Moved by Councilor Woolridge. Seconded by Councilor Singh. Any
[2:23:16]
further discussion on that? Seeing none. All in favor? Is
[2:23:20]
there discussion? So my apologies. It looks like it was
[2:23:25]
moving forward anyways with the hands that were up. But
[2:23:27]
discussion there was a number of series of names up
[2:23:31]
prior to this, so I'm uncertain of who has discussion
[2:23:33]
on this in seeing it. Can I have a show
[2:23:36]
of hands? Who has discussions. Councilor Singh, please. Thank you,
[2:23:39]
worship. And I appreciate the fact that. We're making this
[2:23:44]
motion. I have heard a lot from the public. And
[2:23:47]
honestly, this time. In the economic environment that we're facing.
[2:23:55]
It may be something that is a little bit. Nice
[2:23:58]
to have, but not absolutely essential. And so I appreciate
[2:24:04]
the fact that staff is suggesting. We set it aside
[2:24:09]
for another day. I agree. We use the term iconic
[2:24:12]
and giving the bridge a certain. Picturesque look. But now
[2:24:22]
is not the time. So thank you. Thank you. Was
[2:24:24]
there other comments? Just please, you raise your hand if
[2:24:28]
there's. Trying to understand the law to why we're pulling
[2:24:33]
it out now, and I guess I've just heard. Staff
[2:24:36]
is making a recommendation. But. It seems we have more
[2:24:45]
of a discussion than just that to make a decision.
[2:24:49]
I think. Perhaps. Frivolous for some people. But I look
[2:24:56]
at it as a fear marketing tool. I think it's
[2:24:59]
a great idea, and I think it's worth. Looking at,
[2:25:07]
so. I don't support throwing it out. And, counsel, that's
[2:25:11]
the recommendation that we're. Doing. It's been moved and seconded.
[2:25:14]
We're doing comments and then you can either vote in
[2:25:16]
favor or against, and that will show your approval with
[2:25:18]
regards to the position. That we're taking. I thought that
[2:25:20]
was part of seeing. No further comments. Was there any
[2:25:24]
further comments. No further comments. All in favor? Opp? Opposed.
[2:25:29]
Councilor Hodge opposed to the removal. Thank you. So now,
[2:25:33]
going back to the. Now that. That motion has moved
[2:25:36]
forward going back to the other areas that were brought
[2:25:41]
forth in this section. And I'm going to go back.
[2:25:45]
To just calling the names. I'm assuming that you weren't
[2:25:47]
commenting on the last. One, but let's go to councilor
[2:25:49]
stack, please. Thanks, worship. Thanks, Mac. I just want. To
[2:25:52]
touch on the bike path, sweeping and litter and debris.
[2:25:56]
It's one of the things we hear quite frequently from
[2:25:58]
the public. So we're looking at increase enhancing the service
[2:26:03]
275,000 this year. Is there a base budget that's already
[2:26:07]
in there, and this will be adding to. Yes, your
[2:26:11]
worship. There is a base budget in this area. Some
[2:26:16]
of that budget was, I believe, on a temporary basis.
[2:26:20]
One of the things that we've been spending a lot
[2:26:22]
of attention on in the downtown core is making sure
[2:26:24]
that we're sweeping literally on a daily basis in front
[2:26:26]
of city hall. For those of you. Councilor sack, I
[2:26:28]
know you come in quite early. You'll notice the sweeper
[2:26:31]
goes through there before we ever get to work. And
[2:26:34]
also. The litter collection is something that shows up for
[2:26:37]
our city along the lakefront. If that's not addressed, some
[2:26:42]
of the details I'm sure Mr. Boss can add. More
[2:26:44]
to that. Good morning, Mr. Boss. Good morning, you, worship.
[2:26:50]
To councilor's next question. It is indeed maintaining the current
[2:26:53]
service level. So over the last two years, we've added
[2:26:55]
quite a few kilometers. Of infrastructure to the network, and
[2:27:00]
we're also trying to deliver the service according to the
[2:27:03]
service description that we have, which says that every bicycle
[2:27:06]
lane needs to be swept a minimum of ten times
[2:27:08]
per year. So that's really the service level that we
[2:27:11]
try to deliver to. And in order to make that
[2:27:14]
happen, that's where also some of the money goes, okay?
[2:27:16]
Thanks. Yeah. Because I think that's. We hear frequently and
[2:27:19]
also in the winter. And I think the shoulder seasons
[2:27:22]
with the leaf build up in some of those things.
[2:27:24]
So from the citizens perspective, the goal is ten times
[2:27:29]
sweep per year. But if there's a big snowfall as
[2:27:32]
an example. What would be the expected time before bike
[2:27:37]
lanes would be addressed? Your ship? That's a good question.
[2:27:40]
And that expenditure sits in the snow and ice control.
[2:27:43]
Budget. So that's outside of this one. This is predominantly
[2:27:46]
for sweeping and literally removal in the bicycle parts. But
[2:27:48]
the philosophy there is very much that if we have
[2:27:50]
separated infrastructure that we try to get that particular bicycle
[2:27:54]
infrastructure first because we are in a better position to
[2:27:58]
deliver a good quality service. On that piece of infrastructure
[2:28:01]
as to where the on road bicycle lanes or the
[2:28:04]
one that are painted on the side. They typically need
[2:28:07]
to wait until we have an opportunity to move the
[2:28:09]
snow. Out because in the end, those were built in
[2:28:11]
the snow storage for the road system. So it always
[2:28:14]
takes a few extra days, but we're always trying to
[2:28:16]
endeavor to deliver some infrastructure. Early on, so that. People
[2:28:20]
know that they can use that infrastructure to get on
[2:28:23]
their whereabouts. Good. Thanks, Mr. Vas. Councilor Wolverge, please. Thanks
[2:28:28]
for worship. Just on the item that we removed earlier,
[2:28:32]
I had a question when it was time for comment.
[2:28:36]
Because it was funded from reserve. That has been obviously
[2:28:38]
removed, which I support. That doesn't affect tax rate. Correct.
[2:28:42]
Because. We're still contributing to reserves. Just so that we're
[2:28:46]
clear, city manager that's. Correct your thank you. Councilor Lovegrove,
[2:28:51]
please. Thanks, your worship. I'm just following up on. A
[2:28:58]
couple of. Not clear on why. We've got a couple
[2:29:03]
of. They're showing as enhanced, but I thought. We had
[2:29:07]
base budgets. For safe route to schools. So on page
[2:29:12]
201, Active transportation upgrades. So budgets request that there's annual
[2:29:19]
program. What's the base budget? Are we increasing the base
[2:29:24]
budget or what's changed there? Thank you, your worship. For
[2:29:31]
the active transportation upgrade on page 201, that request, that
[2:29:36]
is a capital program. So we actually do not have
[2:29:39]
base budget for any capital programs or capital budgets. This,
[2:29:44]
in this case, is being considered an enhancement as it'll
[2:29:47]
be. New infrastructure for different areas that doesn't right now
[2:29:54]
exist. This is not renewal. This is an addition of
[2:29:57]
new infrastructure and new services in the area. But I
[2:30:01]
thought we had an existing safer to school program, but
[2:30:04]
let me focus in on that. One along. We do
[2:30:06]
have something for that already. Yes. Thank you, your worship.
[2:30:09]
There is a line item in the ten year capital
[2:30:11]
plan with an. Annual allocation for it, okay? So this
[2:30:16]
is adding to that or something else. If we don't
[2:30:20]
approve this, for example. We're not wiping out the safe
[2:30:24]
route to school program. Now our safe fruits to school.
[2:30:27]
Program. Is funded and the recommendations that come out of
[2:30:32]
that program. Are often funded by a variety of different
[2:30:36]
capital programs. Could be sidewalk program, could be a road
[2:30:39]
crossing for RfB. Or cycling facility. Okay. Councilor 1 second.
[2:30:46]
City manager, please. Yeah. Thank you, worship. Council may recall.
[2:30:49]
Probably at the beginning of your term. We brought forward
[2:30:51]
a report that talked about the utilization of funds that
[2:30:54]
were collected for cash in lieu for frontage improvements for
[2:30:57]
small scale developments and a creative means that Mr. Logan's
[2:31:00]
team came up with with our finance group to get.
[2:31:03]
More of that work done in a timely way so
[2:31:05]
that those funds didn't continue to sit in reserve and
[2:31:08]
degrade in value. And we would get the infrastructure put
[2:31:11]
into the ground. That's what you're seeing. Is the outshot
[2:31:13]
of some of that work. Fantastic. Okay. And you can
[2:31:16]
see some of those. Urbanization projects probably closer to the
[2:31:20]
Pandozi Francis streets in and around that area. This year
[2:31:23]
are a couple of good examples of where we've urbanized
[2:31:26]
those streets and improved pedestrian safety through. Those urbanization works
[2:31:31]
and drainage and such. Okay, thanks for clarifying that. That's
[2:31:35]
great. So none of the base budgets are impacted by.
[2:31:37]
This is just accelerating. And, in fact, appreciate that answer
[2:31:40]
because I had an earlier question on reserves, and I
[2:31:43]
see our DCC reserves coming down to a point. I'm
[2:31:46]
wondering, how many more years have we got DCC reserves
[2:31:49]
to accelerate. Our roads capital program yourself. Yeah. Thank you
[2:31:55]
for worship. I'll start. And if there's. More detail needed.
[2:31:57]
Joel, jump in. But our accelerated capital delivery program, particularly
[2:32:02]
related to roads, is in very good shape, and we
[2:32:04]
anticipate at least a few more years well into the
[2:32:07]
next term of council before we're at a place where
[2:32:10]
we have to have a question. About slowing down. That.
[2:32:13]
Acceleration. That's great news, councilor. Mr. Sass, do you have
[2:32:16]
anything to add to that? Just a quick addition. Thank
[2:32:19]
you, your worship. And a lot of that will depend
[2:32:21]
on the pace. Of development and the revenue that comes
[2:32:25]
in the future as well. So, yes, I would agree
[2:32:28]
with the city manager. We've got a few years well
[2:32:31]
into next council term, and we're watching the revenues very
[2:32:33]
closely. All right, awesome. And then some questions. On the,
[2:32:39]
I guess the birch road upgrades we're continuing to see.
[2:32:45]
And hear from residents about not the portions supporting the
[2:32:48]
PRC, but the portion connecting from Klo north. I'm going
[2:32:54]
to throw this out there and see if anybody has
[2:32:56]
any appetite to split. A motion to go for the
[2:33:00]
PRC birch upgrade portion of it and split out, or
[2:33:04]
at least starve for discussion this afternoon. The southern portion
[2:33:08]
at Klo. I'm going to make a motion in your
[2:33:10]
worship. I don't know if I've. Got a seconder. Do
[2:33:14]
you have a second? Seconder. You do not. Okay. And
[2:33:19]
I'll leave that. Sorry. And I believe the city manager
[2:33:25]
is just. Do you have anything? No. Good. Okay. Thank
[2:33:28]
you. And then. I won't speak to. Others other than
[2:33:35]
the p two. If we do not fund this p
[2:33:40]
two because this looks to move. This is page 204
[2:33:44]
for any of my other colleagues want to follow along.
[2:33:48]
The description says moving it from the collaboration from the
[2:33:52]
sustainable transportation partnership of the Central Okanagan. To. Trying to
[2:34:00]
find the quote, but. It's basically to do more of
[2:34:03]
a Clona centric, I guess, to introduce a city of
[2:34:05]
Clona led go by bike week. If we don't fund
[2:34:09]
this p two, do we end the whole. Is the
[2:34:12]
bike to work week not happening at all, or do
[2:34:15]
we just stay with the partnership? Of the central Okanagan.
[2:34:18]
Mr. Logan, please. Yes. Council. Yeah. If we did not
[2:34:24]
fund the go by bike week. The program, as we've
[2:34:28]
seen it over the last year, through several years, would
[2:34:31]
stop. And we would reach out to the biking community
[2:34:35]
to try to find a different way to deliver. That
[2:34:37]
program. With volunteers, with maybe more business or local support
[2:34:42]
of that program, but the city would not be carrying
[2:34:45]
a line share of the funding for the regional. Gobi
[2:34:49]
bike week, okay? I'm glad I asked that question then,
[2:34:53]
because I do not want that to stop. But then
[2:34:57]
I see a $45,000 tax. Yet if we bump this
[2:35:01]
up to p. One. Can we not give my council
[2:35:04]
colleagues question? And we've deferred the bridge lighting. Can we
[2:35:08]
not take this or fund us out of reserve? Or
[2:35:10]
does it not qualify? Typically, we don't fund. Reserves for
[2:35:15]
operating we typically use capital. Or fund capital programs with
[2:35:19]
reserves. I stand to be corrected by the finance department,
[2:35:23]
but I think. This is. A small. But significant. To
[2:35:31]
some program, and we've been doing it for a number
[2:35:34]
of years, but maybe it's time to look at a
[2:35:36]
crowd or a community sourced or funded program versus one
[2:35:40]
that's bankrolled by the taxpayer. Okay. That's a fair comment.
[2:35:45]
I appreciate partnerships. Absolutely. I guess I would like that
[2:35:48]
one. Starred to talk about later. For my colleagues. Support
[2:35:52]
me. Your worship, do we have a second? So we
[2:35:56]
have first and a second on it. So that's basically
[2:35:58]
starring that particular item. For further discussion. I see no
[2:36:01]
further discussion. All in favor? Opposed. Opposed. Counselor Weber. Councillor
[2:36:11]
Stack. Okay. And then the Pandoza Urban center transportation plan.
[2:36:17]
That's. An interesting one. There's a lot of stuff happening,
[2:36:22]
a lot of growth happening there, and I feel the
[2:36:24]
same about that. Again, same answer. I presume if I
[2:36:27]
ask if this can be funded out. Of reserve. It's
[2:36:29]
operating, so no. Or generally no. In this particular case,
[2:36:34]
I'm advised we can. There are reserves that are available
[2:36:37]
to fund this. I also believe council may be aware
[2:36:40]
that we deferred some of the urban planning. Work in
[2:36:43]
that area as well. So then I would like to
[2:36:48]
star this one. And discuss it later, your worship. So
[2:36:53]
there is a city manager. Just a comment, please, before
[2:36:56]
we go to that. Yeah, thank you. Your worship given
[2:36:58]
it to p two item. I think it would be
[2:37:00]
worthwhile having Mr. Logan. Comment on the capacity of the
[2:37:03]
team to be able to deliver on it if it
[2:37:04]
was funded. Thank you. City manager. Yeah, I would say
[2:37:10]
that. We would probably be looking to defer this by
[2:37:14]
a year, at least. We've got a number of policy
[2:37:18]
reports that we're bringing through, including the Richter. Corridor study
[2:37:22]
getting that finalized. And I just highlighted three other studies
[2:37:25]
earlier that we're delivering. Over the next six months. Okay,
[2:37:28]
on that basis. I'll withdraw. Thank you. Thanks. Thank you.
[2:37:34]
Councilor Cannon, please. Thank you, worship. Our sidewalks. I really
[2:37:39]
like the performance measure three. You're trying to get that
[2:37:42]
up to. 70% completion by 2040, and right now we're
[2:37:46]
at about 64. 65%. That's on page 194. Talks about
[2:37:51]
sidewalk inspections and furniture. What is our baseline budget? Right.
[2:37:54]
Now. For sidewalk repair replacement and what. We need to
[2:38:02]
get to 70%. Hang on just a second, council, and
[2:38:07]
we'll get. That number? 245,000. For inspections. For sidewalk based
[2:38:13]
budget. Amount based budget is $245,000. So how many? Linear
[2:38:21]
meters or feet to get. It's not very far. Many,
[2:38:23]
probably $1,000. A foot meter at least. So it's a
[2:38:28]
substantial. So. With this 5 million plus that we're looking
[2:38:34]
for. Capital bundling that city manager is alluding to. Well,
[2:38:41]
some of that be used. For street urbanization, for sidewalks
[2:38:46]
in as well. The missing links, the street urbanization program
[2:38:50]
council that is identified. Yes, that includes adding sidewalks in
[2:38:55]
most of the ones that we have done do not
[2:38:57]
have sidewalks. Some do, but the ones. For example, down
[2:39:02]
in Morrison this year, that. We did. We just had
[2:39:05]
gravel soak away shoulders and onto front yard. So that
[2:39:09]
did add sidewalk along both sides. We've also added sidewalks
[2:39:12]
where we've retrofitted. Roads after other types of improvements that
[2:39:18]
we've done. So it's a variety of ways that we
[2:39:21]
have not only had a dedicated sidewalk program, but incorporate
[2:39:24]
sidewalks and other capital projects. That we've done. I think
[2:39:26]
you're familiar with the Klo bridge, and on the west
[2:39:29]
side of the bridge. We added a piece of sidewalk
[2:39:31]
that connected down towards. The community and the gas station
[2:39:35]
that's there at Ben Vulin. Thank you. Access awareness committee.
[2:39:40]
Also, they mentioned. Connecting those. Especially those missing links. I
[2:39:44]
know our new park at the end of Cedar Avenue
[2:39:48]
and. There's a mission group just built a condo, and
[2:39:51]
then there's a missing piece. Between. Dandozi. It's half a
[2:39:55]
block, but it's for person. That's. With a disability. It
[2:39:58]
means the world to them. So we can get those
[2:40:00]
missing links. With this street urbanization. That'll be great. Thank
[2:40:04]
you. There's one on the other side of that street
[2:40:05]
now. Thanks. Thank you. Seeing nothing further. Only, please.
[2:40:18]
Okay, so we'll next move into transit, and this is
[2:40:22]
on page 205 of your budget. Volume. Thank you, council.
[2:40:27]
And similar to transportation, there's been a great deal of
[2:40:30]
council emphasis on public transit. And expanding both the service
[2:40:36]
and the infrastructure to meet the demands now and into
[2:40:39]
the future. Out of the council priorities who have been
[2:40:43]
working on in 2025 and. Will be on into 2026
[2:40:48]
is to advance the new Kelowna Transit Operations center on
[2:40:51]
Hollywood Road. I'm happy to report that that. We have
[2:40:56]
preliminary design and updated cost estimates that we've worked with
[2:40:59]
BC Transit and infrastructure BC. The design of Hollywood Road
[2:41:03]
and the construction of that road is in servicing is
[2:41:06]
progressing and that work will start in 2026. So we're
[2:41:10]
preparing a shovel ready site and continue. To pursue funding.
[2:41:15]
Similarly, to respond to our immediate needs, the administration has
[2:41:20]
been working with BC Transit on the expansion. And upgrades
[2:41:22]
to the existing operations center at the Hardyards and work
[2:41:26]
in that area. As currently expanding the remainance facility, parking
[2:41:30]
for increased fleet, and installing of new charging infrastructure for
[2:41:36]
the introduction of battery electric buses later in 2026. We're
[2:41:41]
well under the way on the construction of four bus
[2:41:44]
exchanges. And you may have noticed when we had our
[2:41:47]
council to. Tour on Monday when we stopped in Rutland.
[2:41:51]
That the bus exchange at the end of that parking
[2:41:53]
lot in Rutland is at the landscaping phase. Who were
[2:41:56]
effectively complete. And you will see further that we're adding
[2:42:00]
another exchange at the airport. That's coming up in a
[2:42:04]
couple of years. In addition to those major improvements, we're
[2:42:08]
continuing to improve individual stops and shelters, and most recently
[2:42:12]
focused on the Rutland area. In response to the new
[2:42:15]
Rutland service plan. Continuous improvement in 2026. We'll continue to
[2:42:21]
work with BC Transit to improve transit service. In a
[2:42:24]
variety of ways. The recently introduced UMO electronic fare payment
[2:42:30]
system will continue to be expanded to include some of
[2:42:32]
the special fair products currently approved and planned for the
[2:42:36]
community. Those include working with community partners who roll those
[2:42:41]
programs out. And council will be seeing a report early
[2:42:44]
in the new year talking about special fares. We're working
[2:42:48]
with the Ministry of Transportation in transit to design transit
[2:42:52]
service improvements along Highway 97, and we anticipate coming back
[2:42:56]
to council early in 2026 to discuss these improvements. In
[2:43:00]
detail. Those will be things such as transit priority measures
[2:43:04]
along the highway quarter. And following on from council's recent
[2:43:08]
approval of transit support of land use plan along the
[2:43:11]
Richter corridor. Transportation, integrated transportation will be bringing back. A
[2:43:18]
detailed plan for protecting the right of way to realize
[2:43:22]
a transit service improvement plan along that corridor. And finally,
[2:43:26]
I would like to highlight that the on demand transit
[2:43:29]
service that was introduced as a trial in the Crawford
[2:43:32]
neighborhood. It was the first trial in British Columbia. Was
[2:43:36]
a success, and that trial is continuing, and BC transit
[2:43:39]
is planning to expand this type of service in Colonia
[2:43:42]
in 2026. The most important performance metrics for transit is
[2:43:48]
ridership, and that is performance metric number one. Showing the
[2:43:51]
per capita number of people that are utilizing the service,
[2:43:55]
we are making steady progress. But we have a long
[2:43:59]
way to go towards our 2040 goal, and that demonstrates
[2:44:03]
that continuing to invest in additional capacity and improved service
[2:44:09]
is warranted. Performance. Metric two demonstrates how satisfied people are
[2:44:15]
with our service, and that's usually a combination. Of. Are
[2:44:17]
we reliably, are we coming on time? Is the bus
[2:44:21]
clean? And do they feel safe on our service. So
[2:44:24]
I'm glad to see that we have a steadily increasing
[2:44:26]
performance there. Performance metric three is one of those service
[2:44:30]
and satisfaction is how reliable are we at getting to
[2:44:33]
that stop on time, and this is typically. Early in
[2:44:37]
the day. Are we hitting that stock when somebody's waiting
[2:44:40]
to go to work? Where they have a tremendous sensitivity
[2:44:42]
to being on time. And finally, performance metric four is
[2:44:46]
a measure for counsel on how much are we investing
[2:44:50]
overall? And we have been making a considerable increase here
[2:44:54]
over the last couple of years and working well. Towards
[2:44:58]
our target of 1.28 hours of service per capita, which
[2:45:01]
is about a 9%. Gap that we have between next
[2:45:04]
year and our target in two years from now. So
[2:45:06]
we're making great progress there, and I will now turn
[2:45:09]
it back to the champion of finance. Mel. Thank you,
[2:45:15]
max. The transit surface area has a $53.6 million. Expenditure
[2:45:24]
budget for 2026 and it is operated under three different
[2:45:27]
cost centers. The service area is funded predominantly from grants.
[2:45:34]
This included in here is the provincial contribution for the
[2:45:37]
transit contract, as well as property taxes, fees. And charges
[2:45:41]
transfers from reserves and other revenues. The 2025 revised budget
[2:45:48]
is $44,069,000. And after annualizing previously approved budget requests, we
[2:45:57]
will start the 2026 year at 40,080,000. To maintain current
[2:46:03]
service levels, an additional $10,408,000 is being requested and to
[2:46:09]
enhance service levels, an additional 3,130,000. The service area has
[2:46:18]
three operating requests. These are on pages 212 and 213
[2:46:23]
of your budget volume. First one being the Hollywood Transit
[2:46:27]
center. Phase two, planning a one time request of $125,000
[2:46:32]
funded from reserve. Second is the Orchard Park Transit exchange.
[2:46:38]
Security. This is it. For requests for $50,000. In 2026,
[2:46:44]
increasing to 60,000 in 2027. Ongoing, funded from taxation and
[2:46:50]
then transit. Operations. This is the enhancement for the year
[2:46:55]
at 2 million. $654,000 ongoing. This is funded in 2026.
[2:47:03]
Through funding from the province at about approximately 50% of
[2:47:07]
the contract amount. We will use additional funding. From. Tickets
[2:47:14]
and sales on bus routes, as well as a one
[2:47:17]
time use of reserve funding. Of one point. 26 from
[2:47:24]
the province, which is residual grant money that has been
[2:47:28]
being held by BC Transit. The ongoing impact in 2027.
[2:47:34]
Ongoing is $1.2 million of taxation. The service area is
[2:47:40]
2026. Capital program is in complete alignment with the council
[2:47:46]
approved ten year capital plan. Is there any priority one
[2:47:50]
request that council would like to discuss? Councilor Lovegrove. Questions?
[2:47:57]
Yes. Actually. I'm just looking at the performance indicators.
[2:48:08]
That Mr. Logan shared with us, and I'm looking to
[2:48:12]
see no change in. Not ridership. Sorry. Transit service hours
[2:48:20]
per capita, but in effect. Those would be expected to
[2:48:25]
go up. This? Page 207. Actual is 1.6. 25 estimate
[2:48:34]
1.6 but with population growth. Does that imply we've got
[2:48:38]
a service hour increase there or not? For 24 to
[2:48:43]
25, our service level did increase, but it only kept
[2:48:46]
pace with our population growth. And the service level increase
[2:48:49]
that we have in this year's budget will exceed population
[2:48:52]
growth. So we have a net increase. And that actually
[2:48:55]
leads me to my question, because I was trying to
[2:48:56]
figure out. Where that is under the maintain operating request.
[2:49:02]
And I don't see it because. The one. Transit operations
[2:49:06]
enhance. Doesn't talk about service hour increases. So where is
[2:49:11]
service hour increases for 2026? Thank you, worship. The contract.
[2:49:21]
For the transit. If it is just to pay for
[2:49:25]
the current contract that we have in place. It is
[2:49:29]
not put in as a council budget request for discussion.
[2:49:33]
If you look on page 210 of your budget volume,
[2:49:36]
you'll see a maintaining service line. Or column, I should
[2:49:40]
say sorry. And so in that case, it's a contract
[2:49:43]
that we. Are already committed to doing. Okay. Thank you
[2:49:49]
very much. You've just reduced my concern. Thank you greatly.
[2:49:53]
But then the other thing that you mentioned. In your
[2:49:56]
key accomplishments for 2025, Mr. Logan, was you now have
[2:49:59]
a preliminary design. Can we share that with council? Is
[2:50:02]
that a public number? The cost estimate for the new
[2:50:05]
transit. Op center. It is not a public number, but
[2:50:09]
we are planning to bring an update report back to
[2:50:11]
council. Early in 2026. I'm excited. I'm sure you can
[2:50:15]
tell. Your worship. Thank you for that. I think. That
[2:50:24]
is fantastic. Thank you, worship. Councilor Dehart, please. Thank you,
[2:50:29]
worship. I do have a. Question on Orchard park transit
[2:50:32]
and then a comment on it, too. Can I do
[2:50:33]
them both together? Please. Okay. Thank you. So, Mac, just
[2:50:37]
wondering. On the Orchard park transit exchange improvements, There is
[2:50:43]
no ten year agreement in place with Orchard park. So
[2:50:45]
my question is, should we be? Working towards one or
[2:50:48]
why don't we have one? Or what's going to happen?
[2:50:51]
There because you did list it right in the comments.
[2:50:55]
Just a little concern about that. It's a variety of
[2:50:57]
things going on at the Orchard park right now. The
[2:51:01]
operation. You'll see a transit exchange line item for operating,
[2:51:06]
for security. That's to enhance the security in that location
[2:51:11]
outside of the regular operating hours of the mall. So
[2:51:14]
we've agreed to do that. With respect. To. The reconstruction
[2:51:19]
of the exchange. As you may be aware, Orchard Park
[2:51:25]
Mall. Hasn't really come up with a plan on how
[2:51:30]
they want to redevelop. Their mall in the near term,
[2:51:32]
and given the fact that they've lost the tenant, that's
[2:51:34]
directly adjacent to this area. We recognize that there may
[2:51:38]
be a lot of work. By that landowner on how
[2:51:41]
they want to redevelop that part of the mall. So
[2:51:45]
while we do see the need and the desire to
[2:51:47]
improve that transit exchange, we are being patient and waiting
[2:51:51]
until they have a better sense of what they want
[2:51:53]
to do on their property. Okay. That's great. Well, thank
[2:51:55]
you. And I'm in that area a lot, but. I
[2:51:58]
was really happy to see the Orchard Park Trans exchange
[2:52:01]
security because I do go by there. A lot. Since
[2:52:05]
the bay is closed, to which you just commented on,
[2:52:07]
I do see a lot of activity. Around there, and
[2:52:11]
I think it's really good that you're getting the additional
[2:52:13]
security. Because like I said, I do notice a lot
[2:52:18]
of movement, and there are a lot of people around
[2:52:21]
there at all hours of the day and night, so
[2:52:23]
just very happy to see that. Thank you for your
[2:52:25]
comments. Thanks. Thank you, Councilor Singh. Questions? Comment. I'll get
[2:52:31]
you to hold. Councilor Weber, questions? Yeah. I'm not much
[2:52:36]
on p two s, but I want to look at
[2:52:38]
the p. Two. That's in this one. The transit fare
[2:52:40]
program initiatives. A little while ago, the council voted in
[2:52:46]
terms of a BC by plan to increase transit fares
[2:52:49]
and councilor Lovegrove, and I voted against it, partly because.
[2:52:53]
It affected certain users, seniors and so forth. More they
[2:52:58]
were losing some of their discounts or their passes. So
[2:53:02]
I'm wondering if that's what this transit fare program initiative
[2:53:04]
would cover. It's not very much money. $30,000. So I
[2:53:07]
don't know. What it would do. And it has some
[2:53:10]
strange wording in here. About. Supporting delivery ups. Referendum triggered
[2:53:16]
by the transit faring. I have no idea. To help
[2:53:20]
with this. Good morning, Brittany. Good morning. So, your worship.
[2:53:29]
That getting the wording right. Transit fare program initiatives. It's
[2:53:34]
actually just a supporting budget. Line. So we are already
[2:53:37]
undertaking an affordable transit pass study. You'll see that coming
[2:53:40]
forward. To you in Q one of next year. We
[2:53:43]
actually hope to have it here sooner, but there's been
[2:53:45]
a delay. That will recommend. An implementation of that. This
[2:53:52]
was just funding in case we needed to support some
[2:53:55]
of the partners that are helping us. To administrate the
[2:53:58]
program. But we do have other means in which to
[2:54:02]
support them. So that is why it has become a
[2:54:05]
p two. But it does not stop anything from the
[2:54:08]
program moving forward. If the PT wasn't added, the program
[2:54:12]
could still move forward. Yes? Correct. Okay, then I'll leave
[2:54:15]
it at that. Thank you. Thank you. Councilor stack, please.
[2:54:19]
Thank you. I have two questions. One is just regarding
[2:54:23]
the transit exchange improvements. We're doing mission Okinawagan College. Orchard
[2:54:30]
park. But it's quite significant money. And I have two
[2:54:33]
questions. One, why is it a grant? And why do
[2:54:36]
we get a grant for that? And my second question
[2:54:39]
is, why is it so expensive? Because we have upgraded.
[2:54:43]
These transit locations in the past, and it seems like
[2:54:45]
every few years there's another very large cost to upgrade
[2:54:49]
them once again and. I just am a little puzzled
[2:54:53]
why it keeps coming up. Councilor, thank you for the
[2:54:56]
question. Councilor stack through the chair that is the mission
[2:54:59]
exchange and. The grant funding is ISIP funding. It's federal
[2:55:03]
government funding. So that's what's been supporting our transit exchange
[2:55:08]
program. The mission recreation transit exchange. Is in some ways,
[2:55:14]
combined with. The work that we're doing to expand the
[2:55:19]
h 20 facility and also the activity center. At the
[2:55:23]
mission as well. We're reconstructing the whole bus loop we're
[2:55:28]
introducing. A new intersection along. Glenmore Road to access and
[2:55:34]
egress the site because we're taking the public access off
[2:55:37]
of the driveway that's closest to the H 20. So.
[2:55:42]
There's more work outside of just the actual area where
[2:55:44]
the buses are stopping, so you're moving it over to
[2:55:47]
Gordon, I think. Is that what you're saying? We're adding
[2:55:49]
another intersection farther to the south. We're reconfiguring the parking
[2:55:53]
lot. For the MNP center, and so there's some bigger
[2:55:57]
improvements in that area, plus. Expanding some of the sidewalk
[2:56:01]
and boulevards around both facilities that are adjacent to the
[2:56:06]
bus exchange it's really interesting because I remember many years
[2:56:09]
ago, one of our mayors pushed really hard to make
[2:56:12]
sure that the buses went right in front of the
[2:56:13]
h two center and took them. Off, Gordon. And now
[2:56:15]
we're spending money to take them out of there and
[2:56:17]
put them back onto Gordon, so hopefully. This will be
[2:56:20]
the winter combination for our bus stop council. We're keeping
[2:56:25]
them on the site. Yeah. Okay, my second question is,
[2:56:29]
and I guess obviously these grants are a great opportunity
[2:56:31]
for. Us to upgrade them. I think that's what I'm
[2:56:32]
hearing between the lines is. The funds were available through
[2:56:34]
the federal programs, we might as well use them effectively.
[2:56:37]
Is that fair? To say we want to maximize the
[2:56:39]
use of those. Funds. Yes, council, my second question goes
[2:56:42]
back to page 210, which is regarding to the preliminary
[2:56:47]
budget. And the fees and charges on that projection for
[2:56:51]
2026 is 9,000,605. Am I correct in assuming that's transit
[2:56:57]
fares, essentially? The nature of my question is I know
[2:57:01]
our objective was to claim approximately 25% to 30%. Of
[2:57:06]
our revenue in bus fares. But when I do the
[2:57:09]
calculation of the total revenue budget, it only comes out
[2:57:12]
to 17%, so I'm probably missing something. Thank you, worship.
[2:57:19]
Yes, I do believe. Those are directly related to transit
[2:57:25]
fair revenues. I'm guessing right now. But. This is a
[2:57:33]
holistic budget of everything that's included in transit. Not just
[2:57:37]
the transit. Contract, so that could be the difference in
[2:57:40]
the percentage. There's also advertising council. Yes, it's a small
[2:57:44]
amount of advertising revenue. Yes, and, councilor, I'm just also
[2:57:47]
going to ask potentially the city manager just kind of
[2:57:50]
comment on that because you just raised a point. With
[2:57:52]
regards to the operational overall oper. Operational aspect of it.
[2:57:55]
Yeah. Thank you, your worship. And there may be others,
[2:57:57]
Mac or Joe, who want to weigh in. But. As
[2:58:00]
a heavily subsidized service, and we only target a small
[2:58:03]
percentage of revenue recovery. Associated with this service. We are
[2:58:06]
looking at opportunities to do more with that. Although the
[2:58:10]
expansion of the service in the garage. And other aspects
[2:58:15]
of the service as it grows into the future, will
[2:58:17]
continue to have heavy tax associated funding. Councilor. Just one
[2:58:22]
moment. I'm just going to get clarification. If there's. Anything
[2:58:24]
to add, Mr. Logan or Mr. Sass, with regards to
[2:58:26]
that, because there's always that question that comes with regards
[2:58:30]
to when we're looking at providing these particular services. What
[2:58:33]
is the city adding? Or what is the city contributing
[2:58:36]
towards these? And we know. This is not a profitable
[2:58:41]
service. That we're trying to maintain at a level pricing
[2:58:44]
range. Just anything to add in that? Particular area. Yeah.
[2:58:47]
Thank you. Maybe directly to your question, I believe Mel
[2:58:50]
is correct that based on this budget book, there is
[2:58:53]
more included in the total cost, which makes the revenue
[2:58:55]
as a percentage look lower. But when we have our
[2:58:58]
target, and I believe it's 35%, but Mr. Logan can
[2:59:01]
correct me if. I'm wrong around transit fair recovery, which
[2:59:04]
would have different costs included. Not all of the. Overall
[2:59:09]
supports within the transit area are included in that cost
[2:59:12]
recovery calculation. So that's why it looks lower than you'd
[2:59:14]
anticipated. Thank you, councilor. Thank you. I just want to.
[2:59:18]
Make sure that at least our objectives of collecting. Has
[2:59:22]
not been diminished. In other words, we're still working toward
[2:59:26]
a particular goal because even in this particular one, the
[2:59:29]
fares, fees and charges are 9.6 million, but the property
[2:59:32]
tax hit is 14 million. I just want to emphasize,
[2:59:36]
because often we're saying, hey, we need better transit. But.
[2:59:42]
What we're saying is the general taxpayer in the city
[2:59:44]
is paying for more transit and the users are paying
[2:59:46]
less and less as a percentage of it. The trend,
[2:59:48]
if I'm seeing it, is concerning me a little bit
[2:59:50]
and I just flag it for future consideration. Thank you.
[2:59:55]
More questions. Councilor Wolverich, please. Thanks, Arisha. I can't help
[2:59:59]
but jump. In with a comment on this because we
[3:00:01]
often talk about transit being heavily subsidized. And it's a
[3:00:05]
bugbear for me because snow removal, repairing our roads, also
[3:00:09]
very tax heavily subsidized as well. So we often talk
[3:00:15]
about cost recovery on transit. But we subsidize a lot
[3:00:20]
of other maintenance in the city that is also taxpayer
[3:00:23]
subsidized, so we also have to keep that in mind.
[3:00:26]
I have to mention that because it's a bugbear of
[3:00:28]
mine when we continue. To go back to that narrative.
[3:00:30]
Thank you. Councilor Cannon. Questions? Just the supplemental. I know
[3:00:36]
the target is 35%, but what are we? Running out
[3:00:38]
of boat rail. Do we know? We're in the mid
[3:00:42]
twenty s, I believe. Thank you. Councilor love. Councilor saying
[3:00:49]
you had a comment. Just 1 second. Do you have
[3:00:52]
a question? Just. Okay, please. Okay, so I wonder, given
[3:01:00]
councilor Stack's question, And it seems to come up regularly.
[3:01:05]
If we could add that as a performance factor. Fair
[3:01:09]
recovery. I mean, our target is 35%. We ask it
[3:01:12]
all the time, and I don't. Know if that's something
[3:01:14]
we want to state publicly, but we're asking. It anyways
[3:01:16]
publicly. Maybe we can add it. Thank you. That was
[3:01:19]
okay. Appreciate that. So, seeing no further questions. Councilor Singh,
[3:01:23]
you had a comment? Thank you, but I just want
[3:01:26]
to go. Back to the Orchard park trans. Transit exchange
[3:01:30]
security. Really appreciate that because. It's up till midnight. There
[3:01:35]
are a lot of young people who work in the
[3:01:37]
service. Industry who use that transit exchange, and it's important
[3:01:42]
to have that assurance of safety. If there's any opportunity
[3:01:47]
of it going further into the night wind, buses stop.
[3:01:52]
Sorry, that turned into a question. Brittany, please. Your worship
[3:02:00]
bus is at the Orchard Park Exchange run until 01:00
[3:02:04]
a.m. on weekdays and until midnight on Sundays. Right. So
[3:02:08]
that's why the recommendation, and we were balancing those hours.
[3:02:12]
Thank you. So I just want to say appreciate that,
[3:02:14]
because I know a lot of young people who are
[3:02:17]
there taking a bus home. Thank you. Thank. You. Do
[3:02:21]
you have a question or a comment? Just a comment.
[3:02:24]
Just on getting the fair recovery at the box. I
[3:02:28]
know it's a challenge for the drivers of talk to
[3:02:31]
them, but I've also heard from residents. Even city staff
[3:02:35]
member came to me and said that. They pay their
[3:02:39]
monthly fee, but they see a lot of people go
[3:02:41]
on the bus without paying. And I don't know if
[3:02:45]
that's responsibility or who's enforcing. That's a conversation I put
[3:02:50]
out there maybe for a management decision or discussion, because
[3:02:54]
it isn't fair for people that. Are law buying, paying.
[3:02:58]
Following the rules and contributing where others just decide to
[3:03:01]
walk on and go pay. Thank you so. This is
[3:03:05]
just comment. Councilor, comment, please. Thank you. I just want
[3:03:09]
to give a shout out to our team here. As
[3:03:12]
well as our drivers. And councilor Cannon's last comment is
[3:03:16]
a really good comment. And I have to confess, when
[3:03:20]
my yumo card had a hiccup, And I've asked for
[3:03:23]
it in lieu of a parking stall at city hall.
[3:03:26]
The drivers did not strictly enforce me getting on the
[3:03:29]
bus. I mean, I was waving. I was trying to.
[3:03:31]
Say I'm so sorry. I could have paid cash, but
[3:03:34]
I knew I had that, so. I think there's a
[3:03:37]
balance in there. It's pretty good. I've heard that 3%
[3:03:41]
is typical. A fair evasion rate. That's typical. It's hard
[3:03:45]
to get that lower unless we had stricter enforcement. But
[3:03:48]
just two things. Councilor Singh raised the transit exchange security.
[3:03:52]
I love that. And guess what? It's not. Just young
[3:03:54]
people. There's old people, all people that benefit from that.
[3:03:58]
So thank you for complimentary team. For jumping on that.
[3:04:01]
Thank you very much. And then just one last comment
[3:04:04]
regarding councilor Wolfage's. Comment. Transit is a social determinant of
[3:04:10]
health. It is an act of transportation mode, and absolutely
[3:04:14]
just like snow clearing and everything else keeps us healthy.
[3:04:18]
And we need to do this. This is. A cost
[3:04:21]
effective service that benefits the whole community. Because one more
[3:04:25]
person on a bus or one more person on a
[3:04:26]
bike or one more person. A sidewalk. There's one less
[3:04:29]
person in a car in front of you. Comment. Councilor
[3:04:33]
Stack, I know you want one more comment, you're welcome.
[3:04:39]
Through the board, and it just will light back up
[3:04:40]
and throw it out through the word light. Back up.
[3:04:44]
I can see his eye right there. Okay, let's go.
[3:04:49]
Just. Two brief comments, your worship. Back to councilor Woodbridge.
[3:04:55]
Comment? We have a target of 35%, which were falling
[3:04:58]
far. Short of. So if the decision is made by
[3:05:01]
council that we want to offer much higher subsidized. Transit,
[3:05:05]
then we need to make a policy decision of that.
[3:05:07]
But at the current time. We just don't ever meet
[3:05:09]
our objectives. So then it means if we want to.
[3:05:12]
Change that. We need to relook at our objectives. That's
[3:05:14]
my response to that. And the other comment? I just
[3:05:20]
wanted to wait on councilor Lovegrove and cannons comment about
[3:05:23]
fair evasion. I also have. A citizen reach out to
[3:05:27]
me. And they're very concerned that the fair evasion is
[3:05:30]
far, far higher than we might think. And he had
[3:05:33]
asked us to look into this, and I. Indicated. I
[3:05:35]
would raise that with the city manager. As an inquiry,
[3:05:39]
but I have heard that we've heard that, obviously from
[3:05:41]
multiple sources that there seems to be quite a bit
[3:05:44]
abuse in the far Ab asian area and that it
[3:05:46]
needs some attention to determine whether that is happening and
[3:05:50]
if so, what we should be doing to address it.
[3:05:54]
Councilor Weber, please. I give the mayor and aneurysm here
[3:05:56]
in a minute. But another one, it just raises the
[3:06:02]
question to me in the long run about transit security
[3:06:05]
in general and how we may want to look at
[3:06:08]
that. Transit cops. I don't know. The stations. The bus
[3:06:13]
stops need to be more secure. The buses themselves need
[3:06:15]
to move more secure. And then. That would also affect.
[3:06:19]
How your percentages of bringing in fares and everything. It
[3:06:22]
may just be a long term discussion. We have to
[3:06:24]
look at. That's all. Thank you. Thank you. So, in
[3:06:28]
closing, Yeah. No. When I asked that question and when
[3:06:36]
I brought about that question, I brought it out about
[3:06:38]
for a specific reason. And yesterday when we went out
[3:06:43]
first thing in the morning and we're at Stewart park
[3:06:44]
and opened up Stewart park alongside the food bank and
[3:06:46]
the Salvation army, an individual came up to me and
[3:06:50]
stated how grateful they were that the city. Opened up
[3:06:55]
Stewart park at no cost. So that residents, whether, depending
[3:07:00]
upon their financial situation, we're able to kind of go
[3:07:02]
down. At Stewart park and enjoy the skate with them
[3:07:04]
and their families. And he was so grateful over the
[3:07:06]
years. And one of the reasons why I brought that
[3:07:08]
up, and yes, it goes to our snow plowing. And
[3:07:11]
yes, it goes to those other items, but it also
[3:07:13]
goes to the positive. Aspect of that we recognize there
[3:07:16]
is a need to maintain. This particular service within our
[3:07:19]
community, but we subsidize it and we subsidize and sometimes
[3:07:23]
that's not recognized that we subsidize it. And yes, we
[3:07:26]
have a target that we want to get to at
[3:07:28]
some particular point in time, and we'll work towards that.
[3:07:30]
But that's an operational cost that we pay through taxation
[3:07:34]
and through other items to subsidize that, like we do
[3:07:36]
with regards to Stewart Park. So it was kind of
[3:07:39]
a positive comment and a sense of recognizing what we're
[3:07:42]
doing. To kind of subsidize it, that it is an
[3:07:45]
expense that we incur, that we do not recover for
[3:07:48]
the operational aspect of it, but it is something we're
[3:07:50]
working. Towards, but it's also a service within the community.
[3:07:53]
But I truly like the trigger points. On all the
[3:07:55]
different discussions and went different ways, so truly appreciate. That.
[3:07:59]
So in that we're closing. Melanie. So just to counsel
[3:08:05]
and to everybody that's here, we're going to go through
[3:08:07]
parks. Then we're going to break for lunch. That allows
[3:08:10]
Mr. Logan to finish off his section. So we're going
[3:08:13]
to continue through parks. And then after that, we will
[3:08:15]
break for lunch. Thank you, your worship. So, moving into
[3:08:19]
the park service area. This is on page 220 of
[3:08:25]
your financial plan. Thank your worship. We will wrap up
[3:08:31]
the infrastructure operations. Recap and I would like to highlight.
[3:08:37]
That the parks planning team has run out of Derek's
[3:08:40]
area and Melanie Stefoon has joined us as well of
[3:08:43]
council has questions in that regard. I'd like to highlight
[3:08:47]
in 2025, we had a banner year opening the outstanding
[3:08:51]
to heart community park the waterfront stage renewal. Improving the
[3:08:56]
accessibility of Strathcona park as well as the burn Avenue
[3:08:59]
park and Summit parks. Which many members of council were
[3:09:03]
at those great community facility openings. Looking forward for the
[3:09:08]
next couple of years. We've broken ground on the Parkinson
[3:09:10]
rec center. You had to look at where we're at
[3:09:12]
with that. It's coming along extremely. Well, glenmore park, phase
[3:09:17]
five is well underway. And the tennis dome is under
[3:09:21]
construction in southeast Mission Park. We've also opened the upgraded
[3:09:28]
lookout on Knox Mountain, which is a tremendous combination of
[3:09:32]
public art with an indigenous tone to it and improving
[3:09:37]
a very, very popular park in our city and finally.
[3:09:42]
We also in Knox Mountain, the team has spent a
[3:09:44]
considerable amount of time decommissioning. What we were calling rogue
[3:09:47]
trails. And those trails are contributing to soil erosion on
[3:09:52]
the hillside. And depleting our natural vegetation. Looking ahead of
[3:09:58]
continuous improvements and focusing a little bit more on the
[3:10:00]
operation. We have investigated autonomous moors for our secure area
[3:10:06]
so that we can reduce our staff complement or. What
[3:10:10]
I've noticed is actually the staff go and deliver the
[3:10:13]
device and then they go. Off and do something else
[3:10:15]
while that device is doing its job. And one of
[3:10:19]
those devices that we have in the field now is
[3:10:21]
a robotic line painter and we have a second robotic
[3:10:24]
line painter coming so that we have redundancy and we
[3:10:28]
can ask to do more. That'll be a big help
[3:10:30]
next year when we tackle touchdown, Kelowna. And we also.
[3:10:35]
Continue to expand our battery powered equipment. And there's two
[3:10:39]
reasons for this. First is our environmental goals and objectives
[3:10:42]
to reduce gas powered, but they're also a lot quieter.
[3:10:46]
And you may have noticed when you're down at city
[3:10:49]
hall and the staff are maintaining Stuart Parker or City
[3:10:52]
park. How much quieter that equipment is from. Our traditional
[3:10:55]
equipment. Looking at some of our performance metrics. Performance metric
[3:11:00]
one is around the user satisfaction. I'm very surprised that
[3:11:04]
we only have 90% for 2026 estimate. I think with
[3:11:07]
everything we're doing, I would expect that number is going
[3:11:09]
to increase, not stay constant. We've put a lot of
[3:11:14]
emphasis on performance metric number two and keeping our washrooms
[3:11:18]
cleaner. It's a public amenity that families, particularly under beaches,
[3:11:24]
want, and we've increased. The frequency of service there and
[3:11:28]
similarly waste bins. We've done two things we've increased the
[3:11:31]
frequency in key areas, and we've also changed out to
[3:11:34]
much larger. You see, in the bottom line, we've come
[3:11:37]
from 100 liters to 1300 liters. So that we don't
[3:11:40]
have to empty the bins in city park five times
[3:11:43]
a day. One of the things that people love about
[3:11:47]
colon is the number of plants, our planters, our parks,
[3:11:50]
the parks around city hall, Stewart park. It's really outstanding
[3:11:53]
feature that we do. We're maintaining that service level into
[3:11:57]
next year. And finally, tree planning. We are as well,
[3:12:04]
maintaining the targets for both. Our neighborhoods, programs and our
[3:12:09]
parks planted trees. So again, we're greening up the city.
[3:12:12]
And we're working towards. Our targets in that regard. Thank
[3:12:16]
you, worship. And I will turn it back to. Mal.
[3:12:21]
The park service area. Has an expenditure budget of $80.4
[3:12:28]
million and is operated under six different cost centers. This
[3:12:34]
service area is predominantly funded from transfers from reserves, property
[3:12:39]
taxes, and borrowing. The 2025 revised budget was $86,614,000.
[3:12:51]
After annualizing previously approved budget request, the 2026 year will
[3:12:56]
start at 20,260,000. The service area to maintain current service
[3:13:02]
levels is requesting 48,000,330 7 million. Dollars and to enhance
[3:13:11]
service levels, is requesting 11,768,000. This service area has one
[3:13:18]
priority one operating request, as well as operating and maintenance
[3:13:23]
impacts from their capital program. The one operating request is
[3:13:29]
for park maintenance, and it's an increase of 1,063,000. In
[3:13:32]
2026. Increasing to 1,089,000 in 2027, then 1,115,000 in
[3:13:40]
2028. Ongoing funded from taxation. The
[3:13:47]
2026 capital. Plan fully aligned to the council adopted ten
[3:13:54]
year capital plan. Is there any request that council would
[3:13:57]
like to discuss further. City manager, please. Yeah. Thank you.
[3:14:03]
I can just make a quick comment generally about the
[3:14:05]
park development program for council gets into questions. Typically, when
[3:14:10]
we're advancing or accelerating an area like we have with
[3:14:14]
parks, You have to make a trade off discussion between
[3:14:17]
quality or quantity. And in our case, we're. Doing both.
[3:14:21]
We're doing very, very high quality parks, and we're doing
[3:14:23]
a lot of them over the kind of a five
[3:14:26]
year window. And it is putting pressure on our operating
[3:14:30]
budget. I'm sure Mr. Logan and Mr. Boss could have
[3:14:33]
easily doubled this request. And, in fact, I think they
[3:14:36]
may have, and we brought it. Back down to what
[3:14:38]
we could afford. And to get it to the standard
[3:14:41]
that I think this council and this community would like
[3:14:43]
to see in terms. Of maintenance in our parks, and
[3:14:47]
what's keeping us on track is the innovations that. Mr.
[3:14:51]
LoGaN talked about the team is coming up with, through
[3:14:54]
their own initiative and passion to do a great job,
[3:14:57]
but it is putting pressure on our operating budget. On
[3:15:00]
the planning side, the team is well aware of those
[3:15:03]
operating pressures as well, and taking great strides. To try
[3:15:06]
and create things. That are efficiently operable. In their consistent
[3:15:11]
design of new facilities like you're seeing. In the community
[3:15:15]
centers for under BSK. By using common fixtures and things
[3:15:19]
like that, you'll see that in the washroom program as
[3:15:21]
well as we start to develop new washrooms. To see
[3:15:24]
a little bit more homogeneous designs with. Commonalities to them
[3:15:27]
to reduce operating costs ongoing. So I just wanted to
[3:15:30]
let council know. There's a lot of effort in this
[3:15:32]
area, but that does create pressure and teams working really
[3:15:36]
hard to continue to advance the program at an accelerated
[3:15:39]
pace like we're doing, right. Now. Thank you. Questions. Councilor
[3:15:43]
Wolverge, please. Thanks for worship. And before I go to
[3:15:46]
my question, I just really want to acknowledge performance. Measure
[3:15:49]
four, which is the beautification. And high impact areas. This
[3:15:53]
was highlighted in our city at work project earlier this
[3:15:56]
year and the passion that the parks team brings to
[3:15:59]
their work every day in terms of the floral plantings
[3:16:02]
and all of the beautification we've seen throughout the city,
[3:16:04]
I really have to commend it. Something that's raised often
[3:16:07]
to me throughout the year. And that's reflected in that
[3:16:10]
performance measure there. So I just really want to acknowledge
[3:16:13]
the team for all the hard work that goes into
[3:16:15]
that, because residents continually raise that with me. The one
[3:16:20]
question that I had was around the capital opportunities and
[3:16:24]
partnerships of parks. I know that we've done quite well.
[3:16:28]
In the past with our partnerships office on seed funding.
[3:16:32]
There's a $500,000 request. And the justification is a little
[3:16:37]
bit of a word salad. So I'm wondering if we
[3:16:40]
can just have a little bit more clarity around. What
[3:16:43]
that fund is to be used for, what the strategy
[3:16:46]
is behind it, obviously. It hasn't been identified yet, but
[3:16:50]
it's on page 231. And it says the focus of
[3:16:54]
the Capital Opportunities Partnership Fund is to leverage funds through
[3:16:57]
partnerships to achieve much greater community benefit. To represent a
[3:17:02]
significant multiplier of the investment, and so I'm hoping we
[3:17:05]
can just get a little bit more clarity on. Good
[3:17:09]
afternoon. What that is? Good afternoon, Mr. Edson. Thank you,
[3:17:12]
your worship. And to answer council's. Question. This is one
[3:17:16]
part of two parts of the partnership fund. The total
[3:17:19]
amount is $1.5 million, and these are directed by council.
[3:17:26]
To leverage partnership opportunities. So when I come forward with
[3:17:30]
my partnerships office, I'll speak to the performance metrics of
[3:17:33]
two to one. I believe council regularly refers to that.
[3:17:35]
Two to one. Metric, and this is the base funding
[3:17:37]
that allows us to do it without the base funding
[3:17:40]
in place. We're not able to be nimble and agile
[3:17:43]
to have those negotiations and all. Of it will be.
[3:17:46]
Negotiated by staff and brought forward to council a couple
[3:17:50]
of examples of how council directed those funds. In the
[3:17:53]
past year and made some major community investments happen at
[3:17:58]
a lower taxation than we would otherwise would see would
[3:18:00]
be the Okragon College wellness facility as well as the.
[3:18:05]
Tennis dome that has been identified. Those are the two
[3:18:07]
significant ones, but it's also available to partner on parks
[3:18:11]
development, where a developer could come forward and we could
[3:18:14]
see a park delivered. At a lower cost. So all
[3:18:17]
of those are brought forward and reported to council, but
[3:18:19]
that is. The two to one leverage metric that you
[3:18:21]
will see coming forward and. It's a requirement for us
[3:18:25]
to be able to activate that program. Thank you, Mr.
[3:18:27]
Edstream. And I think that's really important that the public
[3:18:29]
understands how those strategic funds are. Used because after the
[3:18:32]
fact, they're often very much appreciated. So thank you for
[3:18:35]
the explanation. Councilor Dehart, please thank your worship. Yeah, I
[3:18:39]
have just a question. On the cook road. Boat launch.
[3:18:42]
But just as a prelude, I just. Wanted to comment
[3:18:45]
on the manager's, city manager's comments. Completely agree. And just
[3:18:49]
wanted to thank Mr. Boss and his team, and we're
[3:18:52]
constantly, constantly get kudos and compliments. On parks. I know
[3:18:56]
we all do, but I think we should say it
[3:18:58]
more often, but. My question is. On the Cook road
[3:19:02]
boat launch. I just wanted to know because. There is.
[3:19:08]
A substantial. Private operation there that uses the launch extensively.
[3:19:14]
Do we get any cost recovery on what we're? Doing
[3:19:17]
on this? Because. We see that. I mean, it's constant
[3:19:22]
and it's a huge operation, so. I just want clarification.
[3:19:27]
On that. And if we are in what they should
[3:19:29]
or shouldn't or whatever, I'm going. My answer is yes.
[3:19:36]
But I think Derek wants to expand on that. Okay,
[3:19:39]
you're correct. For your worship. Yes. We have, and we
[3:19:41]
have for a long period of time. We have a
[3:19:43]
standing agreement with them. Good. So you feel it's sufficient?
[3:19:46]
City is happy with it, we think. We're getting what
[3:19:51]
we should because it is a huge operation. Yes, your
[3:19:53]
worship, we always transact a fair market value and. They
[3:19:58]
have. Been a good partner, I would say, but also
[3:20:02]
have provided the appropriate revenue that they should for the
[3:20:06]
number of boats, what you are seeing. In there just
[3:20:10]
for council to be aware of because there has been
[3:20:13]
service level conversations about the amount of sediment that's in
[3:20:16]
there. This is a movement going forward to actually see
[3:20:21]
a groin in place to reduce the sediment going. Forward.
[3:20:24]
So we're not going to have the annual. Dredging costs
[3:20:28]
and impacts going forward, as well as a full reconstruction
[3:20:31]
of the actual pads coming in to the Cook Road
[3:20:34]
boat launch, because right now there is a bit of
[3:20:36]
the problems at the toe of the pads as well.
[3:20:40]
So yes to the revenue and yes to finding a
[3:20:43]
longer term solution. So we're not dredging on an annual
[3:20:46]
basis. Good. Thank you very much. And council Dehart, to
[3:20:49]
your question. I believe it has come about with regards
[3:20:52]
to private industry. Also stating great concern that if they
[3:20:55]
have private businesses and are using that particular launch. That,
[3:21:00]
facilities like that. Are not being charged accordingly, and it
[3:21:06]
is good clarification that they are being charged accordingly. As
[3:21:11]
our private industries, according to current legislation or current bylaws
[3:21:15]
that we put into place. So it's just important points.
[3:21:19]
I mean, sometimes that message doesn't get always carried. Out,
[3:21:21]
so I appreciate asking that question. Councilor Cannon, please. Thank
[3:21:27]
you. Thanks to councilor Dehartlo is my question as well.
[3:21:29]
Because I've had a lot of comments and concerns on
[3:21:32]
that. As far as the art walk expansion. I'm going
[3:21:35]
to ask. Member of the Casagai society last year they
[3:21:39]
talked. About this, so I just want to clarify, so.
[3:21:42]
We're moving closer to the Queen's Way, extending through just
[3:21:45]
in the back by casket gardens that won't be affected?
[3:21:48]
I don't believe, but. There'll be Bennett clock and that
[3:21:52]
area, then. Will be renovated, updated. I think Mr. Poon
[3:21:57]
might be the best one to add the details. I
[3:22:00]
know we did. Reduce. We have a master plan or
[3:22:02]
a vision for the whole walk, but we've reduced. The
[3:22:05]
initial construction phase. Your worship. I'll handle. The question. It
[3:22:13]
is a renewal. Of the walk that you see beside
[3:22:16]
casket gardens now. And as you can imagine, as you
[3:22:20]
walk. From the ben o'clock down that corridor. It ends
[3:22:25]
right inside of a parking lot. So? The focus is
[3:22:27]
to actually provide the connection all the way through. And
[3:22:31]
if you think about the downtown and our cultural plan.
[3:22:35]
Eventually, it will connect behind the colon, community theater, and
[3:22:37]
then connect to the art walk. So this is the
[3:22:39]
next stage, so it doesn't provide that feeling right now
[3:22:42]
where you just kind of dead end in the city
[3:22:44]
parking lot. Thank you very much. I appreciate that explanation.
[3:22:48]
Just one. Last question on the performance measure five, the
[3:22:51]
sustainable urban forest strategy. It talks about 3140 trees per
[3:22:57]
year is what we're trying to do, but we're only
[3:22:59]
at 2700. And then it might not even be 27,
[3:23:02]
because it could be less than that. With trees removed
[3:23:05]
and damaged and vandalism. Is that correct? Yes, unfortunately, is
[3:23:09]
correct. As you know, homeowners that think they can cut
[3:23:13]
down trees in public property. Do we know? How significant
[3:23:20]
that is. Last year. I can think of at least
[3:23:25]
20 to 25 that came down. And we applied fines.
[3:23:29]
And I know for one we settled with property owner
[3:23:34]
for. Over $55,000. Thank you. Councilor Weber, please. Just going
[3:23:43]
back to the art walk expansion again. I see that
[3:23:47]
it includes updating Bennett Plaza last night at the Downtown
[3:23:51]
Colonial association board meeting. They were talking about a lack
[3:23:54]
of public washrooms in some parts of downtown, and I
[3:23:58]
said, I remember seeing something about this in the budget,
[3:24:01]
and so literally, we've had various reiterations or iterations of
[3:24:04]
washrooms and. Facilities in that area. And is that part
[3:24:09]
of the overall plan for that, too? For that area.
[3:24:15]
The public washroom plan that we have right now is
[3:24:16]
focused more on renewals in the beach areas, not in
[3:24:19]
the downtown area. Mel could correct me if I'm wrong,
[3:24:22]
but I don't think Carrie park has any contemplated public
[3:24:25]
washrooms being added there. But we are looking at City
[3:24:28]
park and potentially a change room facility in that area.
[3:24:32]
Okay. No, the reason I mentioned it is that ciS
[3:24:34]
public washrooms. In the art walk expansion description. So, anyway,
[3:24:37]
that's besides the point, I guess. For now. Thank you.
[3:24:42]
Councilor Lovegrove. Do you have questions? Thanks. So appreciate questions,
[3:24:48]
my colleagues. I just want to follow up on the
[3:24:50]
performance measure five. So am I reading this right? Our
[3:24:54]
target is. And you wrote it in the last sentence,
[3:24:56]
31 40 per year. And so for 2026, our estimate,
[3:25:00]
or forecast is we're going to. Stay at 2700. The
[3:25:04]
same amount we planted this year? That's our expectation, yes,
[3:25:07]
council. Okay, good. Okay, great. And then. Where is it?
[3:25:13]
Come on. I just moved my finger. There it is.
[3:25:19]
What's the timing on the aquatic center? This is page
[3:25:21]
232. Carry park. We're currently constructing phase three a, which
[3:25:30]
is the twinning of the pathway from the sales towards
[3:25:33]
the west to connect to the previous. Previously constructed. Phase
[3:25:39]
two. Phase three. B is the aquatic center that's currently
[3:25:43]
in the design. Stage and the construction is non anticipated
[3:25:48]
to start until at least the fall of next year.
[3:25:50]
After this or the heart of the tourist season. Even
[3:25:54]
if we have an opportunity to move in a little
[3:25:56]
earlier. With Memorial cup and touchdown Kelowna. In our usual
[3:26:01]
summer activity, we're going to hold off until the fall
[3:26:04]
for the start of that, and that'll also coincide with
[3:26:07]
the start of construction on the carry park. Reconstruction of
[3:26:11]
that area. Okay, fair enough. That's exciting. And thank you
[3:26:14]
for that. The park upgrades. Just detailed looking at all
[3:26:19]
the different parks. Great. Strathcona. There's more work to be
[3:26:25]
done in Strathcona Beach Park. Maybe I should ask. What?
[3:26:30]
Sorry. What work is going to be done in Strathcona.
[3:26:34]
Oh, sorry. Page 233. I'm not 100% sure. What the
[3:26:40]
details are and that what the plan is for that
[3:26:42]
park. Maybe Ms. Dapun. Can advise council on that likely
[3:26:46]
small item. The quantities association that has been key with
[3:26:51]
regards to kind of bringing forward apparatus that is completely
[3:26:55]
user friendly. Has future plans to look at expanding that
[3:26:59]
through their initiatives, and that would kind of be working.
[3:27:02]
Alongside, if you care to add anything else to that.
[3:27:05]
Sorry. I knew you guys were just chatting. There for
[3:27:07]
a second, so I jumped in. Yes, your worship, that
[3:27:10]
is correct. So the master plan. For Strathcona park is
[3:27:14]
done in phases. And the next phase that we work
[3:27:19]
with. Typically KGH foundation is for swings and a splash
[3:27:24]
area for accessibility. Thank you. Thank you. Okay. Thank you
[3:27:29]
very much. Thanks. Thank you. Seeing no further questions. One
[3:27:34]
more question, Councilor Dehart. Thank you, Mila. Matt, just to
[3:27:38]
clarify, because I don't know if anyone. Well, I got
[3:27:43]
lost because of. Mr. Councilor Webers. So it says. On
[3:27:48]
our artwalk expansion. On page 231, it does say public
[3:27:52]
washroom. But. You said. Well, I got mixed up when
[3:27:57]
you start talking about it, because it does say that.
[3:27:59]
In the program, and there is a washroom there. I
[3:28:02]
know it was volunteer run and whatever. I don't know
[3:28:04]
what's happening with it now. So can you explain that
[3:28:08]
public washroom bit there? Because it does say that in
[3:28:11]
the budget. Thank you, Councilor Dehart. I do not know
[3:28:14]
the details on that, so I'm. Going to look, Mr.
[3:28:17]
Boss. Councilor. Good question. So I think it's an issue
[3:28:22]
of write up here. We have a project for also
[3:28:30]
the Queen's Way Plaza design. Which was a different portion,
[3:28:36]
which would contemplate a building. For transit, bicycle storage, et
[3:28:41]
cetera, et cetera. This portion of that funding is related
[3:28:44]
to the artwork. Phase three only. So, basically, starting at
[3:28:48]
the plaza. Moving its way through. The parking lot up
[3:28:52]
to Doyle. Confusion there with regards to two. Great. Thank
[3:28:56]
you for the clarification. No further questions. Comments councilor stack
[3:29:01]
yes, thank you. I just wanted to lend my voice
[3:29:03]
to councilor Woolridge. Indy hart on complimenting our parks department
[3:29:08]
on the condition of our parks. I just seem to
[3:29:11]
be spending more and more time in them. And I
[3:29:15]
do believe from all the parks I've seen in the
[3:29:17]
different communities I visit, that the quality of grass. The
[3:29:21]
flowers and the cleanliness of our parks are second to
[3:29:25]
none. And I think even, like with the new waistbands
[3:29:29]
that are in there, I've not seen overflowing like. We
[3:29:31]
used to. We used to have a real problem with
[3:29:33]
that. And. Staff have come up with a very, very
[3:29:37]
good response. But just the quality of the grass. Like,
[3:29:40]
even in late August when the weather is super hot.
[3:29:43]
And dry here. Our grass in our parks is absolutely
[3:29:46]
beautiful. So it's something I take. A lot of pride
[3:29:50]
in. And I also touched on the Dehyd park. It's
[3:29:53]
just absolutely spectacular and even. As down there last week.
[3:29:57]
Once again, the grass condition is fantastic. So something I
[3:30:01]
think we as citizens should all take a lot of
[3:30:04]
pride in. Thank you, Councilor Odge. Please. Well, ditto, Mr.
[3:30:09]
Merrier. At the end of this term, some of us
[3:30:13]
may or may. Not come back again to council. I
[3:30:15]
know I won't be, but I will leave here. With
[3:30:18]
the one thought of my mind, the thing that I'm
[3:30:21]
proudest of. With this council and with this. Staff. For
[3:30:28]
this city is our parks. And it's a direct hard
[3:30:31]
work of staff who have just done a phenomenal job.
[3:30:35]
They've found land. They've enhanced land. We've got some brilliant
[3:30:40]
staff that have worked very hard to find good property.
[3:30:46]
And then the workers. That have turned them into magic.
[3:30:50]
So. That'll be my greatest memory. And the greatest pride
[3:30:55]
of this council. And this council. And this whole group.
[3:31:00]
Is our parks, and it's directly due to. A cohort
[3:31:05]
and staff, and I just want to say thank you.
[3:31:07]
Thank you very much. Thank you. Councilor Hodge. Councilor, logo,
[3:31:10]
please. Just one final adding to the dittos. Gudos. And
[3:31:15]
thanks again. Yesterday when you and I were on the
[3:31:17]
Rinka, the third person that joined us at 07:00 a.m.
[3:31:20]
was. A recent. Transfer from Vanderhoof to Kelowna, and he
[3:31:26]
could not say enough about our parks. He was just
[3:31:30]
blown away. He used to be one of the parks
[3:31:32]
and recreation managers up there, and he's got the eye,
[3:31:35]
he's got the expertise, and that was high. Prayers for
[3:31:38]
our city. Absolutely proud of what we do. Thank you
[3:31:40]
so much. Thank you. Just final comment with regards to,
[3:31:45]
obviously. What the team, Mr. Logan, Mr. Boss, and all
[3:31:50]
of the partnership teams that's involved with regards to this.
[3:31:53]
Thank you for the work that you do in our
[3:31:54]
community. As council was just saying? It's. Very obvious. Of
[3:32:01]
the concern that we have around parks and the recreation
[3:32:03]
elements within this community, and I know there was discussion
[3:32:06]
that came up earlier this week with regards to an
[3:32:09]
area of our community that we are using potentially for
[3:32:12]
something a little bit different. But the plan is that
[3:32:15]
I hope that that even activates that park more, as
[3:32:17]
councilor Stack had mentioned, and brings it even that much
[3:32:20]
more into the forefront. Within our community and based upon
[3:32:22]
the work that you've done in other areas, to kind
[3:32:25]
of treat our parks appropriately. I know that we care
[3:32:29]
about them, and it will definitely be done. So I
[3:32:32]
thank you for that. And that I would say we
[3:32:36]
are adjourned. Is there one other item to go through?
[3:32:41]
Just that there is two priority two items in this
[3:32:44]
service area. One for the bear proof waste. Receptacles and
[3:32:47]
one for trail network. So, just to ask if council
[3:32:51]
would like to. Discuss either of those requests. Seeing none.
[3:32:55]
We are breaking for lunch. Thank you. Excellent. Thanks. Council,
[3:33:05]
we will reconvene. At 115. And just to a note.
[3:33:17]
We have an appointment this afternoon at. 345. Oh, it's
[3:33:22]
Monday. Okay. Sorry. My apologies with regards to it. Thank
[3:33:25]
you.
[3:38:05]
Good God. Way to back me up. Good. Thank you.
[3:38:13]
Just going to call this back to order. City clerk,
[3:38:20]
please. Thank you, your worship. For those following along on
[3:38:23]
the agenda, we are now on. Item 14 for the
[3:38:26]
support and recreation service area. Afternoon, Ms. Gabriel. Thank you,
[3:38:34]
your worship. As Laura just mentioned. Start with sport and
[3:38:39]
recreation and just anyone who's following along in their budget
[3:38:43]
volume. We are on page 236. And we welcome the
[3:38:48]
divisional Director of Active Living in Culture, Mr. Jim Gabriel.
[3:38:53]
Thank you, Ms. Gabriel, for being here. Thanks. Good afternoon,
[3:38:56]
your worshiping council. Great to be here. So sport and
[3:38:59]
recreation play a pitiful role in shaping a vibrant, healthy
[3:39:03]
and cohesive communities. This service area recognizes that accessible sport
[3:39:07]
and recreation is essential for everyone. People of all ages,
[3:39:11]
abilities and interests. Through the programs and activities and services
[3:39:15]
provided, numerous benefits are achieved, including advanced. Enhanced mental, physical
[3:39:22]
and social well being, help build strong families and connected
[3:39:25]
communities, improve quality of life. Provide significant economic stimulus and
[3:39:31]
contribute to community growth. In 2025, numerous projects and initiatives
[3:39:37]
were advanced. A couple examples include the development of a
[3:39:40]
corporate accessibility plan. Per legislative requirements and accessibility Advisory committee
[3:39:48]
was established that supported the development of. Accessibility to plan
[3:39:53]
and we continue to support this group in the advancement
[3:39:56]
of the actions from this plan. The building stronger. Klona,
[3:40:00]
which has been referenced numerous times today, continues to play
[3:40:03]
a big role within our world. And there's probably three
[3:40:06]
touch points for us, which is the RPRC. Detail design
[3:40:11]
activity center validation. And operational work looking when we open
[3:40:17]
the facilities, and I'll make reference to that in the
[3:40:19]
next slide as well. Also updating our fees and charges
[3:40:22]
program where fees set become more transparent and intentional. We
[3:40:27]
now have a framework to continue to build on that
[3:40:30]
connects our fees to the cost of delivering the service.
[3:40:34]
Community benefit and target investment. And again, the program is
[3:40:38]
connected back with the corporate fees and charges. Policy. A
[3:40:43]
couple items for continuous improvement. The first one I was
[3:40:45]
going to take just a minute on. Is the BSK
[3:40:47]
operational planning. Recognizing the complexity and significance of launching five
[3:40:53]
new recreation facilities and I put Okanagan collage into that
[3:40:56]
bucket as well. Across divisional team has begun operational planning
[3:41:01]
for BSK. The team is creating the framework. For the
[3:41:05]
allocation of time and space within the facilities, operations, memberships,
[3:41:10]
programs, staffing, and financial modeling with a focus on data
[3:41:14]
and user experience. This will ensure the facilities will open
[3:41:18]
up when they're ready to go. The last one I'll
[3:41:21]
comment on. Just under this area is the event framework
[3:41:25]
with significant intention on event and upcoming events, major sport
[3:41:29]
and community events, and the fact that event tourism is
[3:41:32]
now part of the action within council priorities under economic
[3:41:37]
development. We are in the process of updating our event.
[3:41:41]
Framework and service levels. We've been to council numerous times
[3:41:44]
over this last year, talking about some of the different
[3:41:46]
events that have happened, the community value, community benefit, economic
[3:41:50]
impact, and this will be kind of a segue into
[3:41:54]
workshops starting on Monday, and we'll do some more. Work
[3:41:57]
over the course of next year to update the event
[3:41:58]
framework. Understanding the vision. And where we're going to be
[3:42:01]
going with this portfolio. Couple performance measurements to highlight. I
[3:42:07]
won't go through them all, but I'll touch. On just
[3:42:09]
a few. The first one is the sport park area
[3:42:12]
per 1000 residents. This metric measures the area of grass
[3:42:16]
sports fields is the field itself in the surrounding area.
[3:42:23]
And it's provided in hectares per 1000 residents compared to
[3:42:25]
other municipalities. You can see that were midstream, slightly below
[3:42:29]
midstream in terms of what we offer. And then when
[3:42:32]
you consider this metric, the important aspect, I think, is
[3:42:35]
you take the numbers that we have the combination of
[3:42:38]
that with the level of use on the site. And.
[3:42:43]
Their availability becomes a pretty important combination of things to
[3:42:46]
look at and I'll touch on. That a bit more
[3:42:48]
in the next slide. The next area. Citizen satisfaction. Performance
[3:42:54]
management number two. And so every two years, the citizen
[3:42:57]
survey is carried out to assess the public satisfaction with
[3:43:00]
the Mitchell programs and services. Evaluating resident satisfaction with city
[3:43:06]
provided support and recreation facilities, programs, and the area really
[3:43:10]
looks at parks and sports fields, rec facilities and programs.
[3:43:14]
And one of the things you'll notice in 2026 sports
[3:43:17]
fields have taken a bit of a dip and it's
[3:43:20]
got nothing to do with the quality of them just
[3:43:22]
through the. Building sunglass bundle. We've taken five key sports
[3:43:27]
fields out of our inventory. And they're key facilities and
[3:43:31]
so, of course, that's going to have a bit. Of
[3:43:32]
an impact on what we can do. But come 20,
[3:43:35]
27, 28, we'll have a net gain. I think of
[3:43:38]
about 4.5. When you look at Glen Moore with natural
[3:43:41]
light. Natural. Turf field, wet lights. Retland will have an
[3:43:45]
artificial turf with lights, and so that combination will be
[3:43:49]
better off than where we are today. So a bit
[3:43:50]
of a. Bit of a pain today. But net gain
[3:43:54]
down the road. The last two. The first one, tournaments
[3:43:58]
and events. The advantages of hosting tournaments and events has
[3:44:03]
been documented significantly over 2025. Our approach adopts a proactive
[3:44:10]
approach on event hosting by securing tournaments and events, aiding
[3:44:14]
in the growth of existing events and ensuring. The availability
[3:44:19]
of well maintained facilities and tournament sites. The objective is
[3:44:24]
to foster a dynamic and balanced mix of tournaments and
[3:44:27]
events throughout the community. One of the things that we're
[3:44:30]
looking at over the course of 2026 right now. It's
[3:44:34]
more of an output. It just shows a number of
[3:44:36]
things that we've been able to secure and that we
[3:44:38]
host. We're looking to change that to something a bit
[3:44:40]
more. Looking at the economic gain of these events and
[3:44:45]
turn it around from an output to an outcome. Kind
[3:44:48]
of framework? The last one. Is the sports facility and
[3:44:53]
capacity hours. So appreciating the importance of sport and recreation.
[3:44:57]
Facilities play in enhancing community life. Understanding. The facility capacity
[3:45:02]
as a key aspect in terms of how we can
[3:45:05]
service the community and how we can influence future planning.
[3:45:09]
The aim is to optimize the use of these facilities.
[3:45:12]
Maintain adequate public access, required maintenance time and anticipate future
[3:45:17]
needs. Presently, our sports fields, arenas and stadiums are at
[3:45:22]
capacity. With that. I'll flip it back over to bell.
[3:45:34]
The Sport and Recreation service area has an expenditure budget
[3:45:38]
of 2026 of $146.6. Million and is operated under six
[3:45:45]
cost centers. The funding strategy for the year is predominantly
[3:45:51]
borrowing. That is all attributed to the replacement of the
[3:45:56]
Parkinson Recreation center as part of the capital program. The
[3:46:01]
other major funding sources are transfers from reserves and property
[3:46:05]
taxes. The 2025 revised budget was $48,598,000.
[3:46:16]
After the annualization of previously approved budget requests, the 2026
[3:46:20]
year is starting at 25,880,000. To maintain current service levels,
[3:46:27]
an additional 77,083,000 is being requested and to enhance service
[3:46:33]
levels. An additional 43,588,000 is requested. This service area
[3:46:43]
has two priority one operating requests as well as one
[3:46:47]
request for operating and maintenance. Impacts from the capital program.
[3:46:50]
These can be found on page 246 of your budget
[3:46:54]
volume. First request is for community partnerships starting at $70,000
[3:46:59]
in 2026. Increasing to 135,000 ongoing funded from taxation. Second
[3:47:07]
is the sports and community events activation for 170,000 in
[3:47:11]
2026, increasing to 235,000 ongoing, which is funded from taxation,
[3:47:18]
but is recommended to be funded as part of the
[3:47:21]
council stra. Strategic initiatives budget request the original $500,000. The
[3:47:28]
sport and Recreation 2026 capital requests. Are in alignment with
[3:47:36]
the council approved ten year capital plan. Is there any
[3:47:41]
priority one request that council would like to discuss further?
[3:47:46]
Councilor Wolverich. Thanks to worship. Thanks, Jim. Just a question
[3:47:50]
about the community partnerships position. The explanation kind of shares
[3:47:56]
what it will function as. But how is that being
[3:47:59]
managed right now? And what are the implications? If we
[3:48:02]
don't have this position, yes. You worship this position within
[3:48:06]
the partnerships office. They pay attention. They do a lot
[3:48:09]
of work on the major partnerships, the big ones and
[3:48:11]
the things that we do with some of the major
[3:48:13]
facilities and stuff. So this one takes a deeper like
[3:48:15]
a lower level look within the community itself. So it'll
[3:48:19]
be working with a number. Of different not for profit
[3:48:22]
organizations within the community as they look after their facility.
[3:48:25]
So it's. Going to be looking at how. We can
[3:48:28]
leverage and manage existing relationships and existing partnerships, and I
[3:48:32]
can give you a couple of examples and service agreements.
[3:48:35]
Be proactive in how we manage them and how we
[3:48:38]
work with them. Managing partnerships is a two way process.
[3:48:43]
In the service, you don't just do it and sort
[3:48:44]
of walk away. So we have some responsibilities and accountability
[3:48:47]
with that as well, so. It's going to deal with
[3:48:50]
that, but also help us with new opportunities are at
[3:48:53]
the door and we get numerous that come in through
[3:48:55]
the sport and recreation area and arts and culture. Area,
[3:48:58]
how we can advance them and either to move them
[3:49:00]
forward. Or. To. Stop the process. Okay, so. It's going
[3:49:07]
to allow us. To work better, I think, within our
[3:49:10]
organizations that we deal with and also be more responsive
[3:49:13]
to. New opportunities that are coming in. Okay, so it
[3:49:15]
moves us outside of just. The large facilities like the
[3:49:18]
YMC that manages some of the bigger. For example, those
[3:49:23]
ones still fall within AOC in terms of the day
[3:49:25]
to day contract administration. Okay, so this position would play
[3:49:29]
a part of that. Right now. Often I wouldn't say
[3:49:32]
it's side of desk, but. Without the proper attention. You
[3:49:36]
get the attention when it's almost like issues management versus
[3:49:40]
how are things going? Get proper reporting, looking at the
[3:49:43]
facilities, doing proper walkthroughs and. Things like that. Okay, that
[3:49:46]
makes sense to me. Thank you. Thank you, councilor stack.
[3:49:48]
Please. Thank you. Melanie, can you speak once again? To
[3:49:52]
the sports and community events activation. You mentioned that. This
[3:49:57]
is in alignment with the also council priorities. But is
[3:50:00]
this as well as or just refresh how the whole
[3:50:03]
package comes together so I can understand what the total
[3:50:06]
impact is. Your worship. I think it would be. Archie.
[3:50:11]
Thank you. Thank you, your worship. So. When we were
[3:50:13]
planning the budget for 2025, we had earmarked $500,000. To
[3:50:18]
be included in this budget as part of the council's
[3:50:21]
strategic initiatives. Top up like this is a funding source
[3:50:24]
that was in the budget a couple years ago that
[3:50:26]
has been fully allocated out now. From that $500,000. Two
[3:50:32]
requests were identified and are being recommended to be funded
[3:50:35]
out of that amount. So the first one being the
[3:50:38]
business improvements area service area request. And then this one
[3:50:42]
as well, the sports and community event. The result is
[3:50:46]
that $500,000 is now a $150,000 request that is included
[3:50:51]
under governance and leadership. Okay, but. The other parts of
[3:50:55]
it are worth showing up in the other parts of
[3:50:57]
the budget now, correct? You're. Thank you. Thank you. Thank
[3:51:00]
you. Councilor Hodge, please. Thank you, Mr. Mayor. I'm just
[3:51:03]
going to, for clarification here on the community. Partnerships. 69,600
[3:51:08]
is for half a year. Then next year we'll go
[3:51:12]
to 135. Feet. That 69,000 represents. What is that, just
[3:51:19]
one wage? Your worship. That would be half. We'd come
[3:51:23]
in halfway through the year, so it'd. Be like a
[3:51:26]
June type start scenario, and then it would be full
[3:51:29]
on come 2027. That's just one person's salary. Okay. Thank
[3:51:38]
you. Councilor Cannon, please. Thanks, Mr. Gabriel, and to your
[3:51:45]
team for the great work and. A great pasteas. And
[3:51:47]
I just wanted to know on page 249, $10 million
[3:51:51]
set aside. For recreation facilities, infrastructure upgrades. It's kind of
[3:51:56]
broad. Just large and small. Recreation facility. I wonder if
[3:52:00]
you can drill down a little bit more, which is
[3:52:02]
envisioning with that. These upgrades. Okay.
[3:52:15]
This one is for. A variety. A variety of different
[3:52:22]
facilities. It's work to look at things around the upper
[3:52:27]
bowl, different arenas, facilities and stuff like. That. So it's
[3:52:31]
an allotment that funds that we can begin to look
[3:52:32]
at. Different. Facilities and look at upgrades in terms of.
[3:52:38]
Better able to service the public in different events. So
[3:52:41]
if you think about the Apple bowl for example, could
[3:52:43]
be items in the Apple bowl, looking at the bleachers,
[3:52:46]
looking at the dressrooms. Looking at electrical requirements and stuff
[3:52:48]
to make that facility better for current users, but also.
[3:52:52]
For future. Opportunities, and it would be looking at a
[3:52:56]
number of different facilities over time, but I think that
[3:52:58]
would be the priority at this time. Okay, so there's
[3:53:01]
no definitive plans for 2026. For the 10 million. There's
[3:53:06]
no definitive plans with the $10 million to be spent
[3:53:09]
in 2026, Mr. Estrom, any comments on this?
[3:53:19]
If you'll get Derek, can you help out there?
[3:53:34]
Your worship, as part of our facilities department, we undertake.
[3:53:39]
Condition assessments of all our facilities. So these are the
[3:53:41]
renewal and enhancement aspects of it for the most part.
[3:53:46]
They're identified, and they all are identified for building renewal.
[3:53:51]
Specifically, Coldwell family Y is the largest one for building
[3:53:56]
systems renewal. The replacement of two of the air handling
[3:54:00]
units is of vital importance to move forward, and so
[3:54:04]
these are the types of things that are identified. OK
[3:54:07]
Talking gymnastics center as well has a comprehensive renewal of
[3:54:11]
its HVAC systems. So as we've gone through the listing
[3:54:15]
of the renewal projects that are needed within the area.
[3:54:19]
The building renewal systems are of the highest prone priority,
[3:54:23]
and they go across a number of different facilities. As
[3:54:27]
Mr. Gaber alluded to, possibly the Apple bowl then as
[3:54:29]
well, and just again, just to confirm that it is
[3:54:31]
approved in our ten year capital. I was just wondering
[3:54:34]
as far as what there is planning for next year.
[3:54:38]
And when will we know what our cost will be
[3:54:40]
to host the Lions game? Your worship. Your worship. We're
[3:54:48]
working closely with. Them. We're looking at funds like this
[3:54:53]
to look at what improvements we're going to. Be doing?
[3:54:56]
With the applicable understanding. What they're set up for. Game
[3:55:01]
day will be. Events like the apple, events like the
[3:55:04]
Okanagan or the BC lions, significant economic impact. They're bringing
[3:55:08]
to the community. And when you look at locations where
[3:55:10]
they're going to be the ability to influence how those
[3:55:15]
facilities are set up. Will be. A key events in
[3:55:20]
the past, CCMAs and things like that. Our investment has
[3:55:25]
been in the tune of like, 450 or so $1,000.
[3:55:29]
And I think as we look at facility upgrades, And
[3:55:33]
the relationship with the lines will be probably in that
[3:55:36]
realm as well. When you look at facility upgrades that
[3:55:39]
will support them using existing resources. Operational opportunities. That we
[3:55:46]
can leverage to support them. That's sort of the game
[3:55:49]
plan that we're working. This fund could be used for
[3:55:51]
that. Possibly. Then. The fund would be used. For appable
[3:55:56]
improvements. And one of the things that would be important
[3:55:58]
is to line, where possible. Align these improvements to the
[3:56:02]
needs of the lines. First and foremost, it's going to
[3:56:05]
be about improving the facility itself. Thank you. City manager,
[3:56:10]
please. Yeah. Thank you, your worship. Just for clarity on
[3:56:13]
one aspect of that, Mr. Gabriel is correct. When he
[3:56:17]
mentioned drawing on existing funds to support this event. And
[3:56:20]
I think that's the bottom line is that within the
[3:56:22]
existing budgets that are presented to you today, And other
[3:56:27]
budgets, such as major event development and major partnerships. We
[3:56:32]
anticipate funding the cost from there. And as council knows,
[3:56:36]
when we had the BC lines here and we introduced
[3:56:40]
that those games were coming to our community. That was
[3:56:43]
a very question that was asked by the media, and
[3:56:46]
we directed that question when we answered back the media.
[3:56:49]
I think, as all of councilor is aware, that as
[3:56:51]
soon as we were aware of exactly what that would
[3:56:53]
be, we would share that publicly, but we're still working
[3:56:55]
through that process. I think that was shared with council.
[3:57:00]
Seeing. No further questions. Excellent. So we'll now move into
[3:57:07]
arts and culture. This is on page 251 of your
[3:57:12]
budget volume. Again. Thank you, your worship. The goal of
[3:57:15]
arts and culture is to inspire, support and develop a
[3:57:19]
rich variety of high quality arts, culture, and heritage experiences
[3:57:23]
for residents and visitors. We do this through investing in
[3:57:26]
infrastructure, artists and nonprofit organizations. The goal is to empower
[3:57:32]
the local creative sector to deliver arts and culture events,
[3:57:35]
programs, and activities through various grants and artists led initiatives.
[3:57:41]
Again, a number of accomplishments have been achieved over the
[3:57:43]
course of this year. A couple of highlights would be
[3:57:46]
a busy Clona community theater. KCT hosted over 200 performances
[3:57:50]
with over 90,000 patrons. A key piece to this success
[3:57:54]
is our volunteer program that further supports audience experience. With
[3:58:01]
over 150 volunteers contributing over 7500 hours of quality service.
[3:58:07]
We continue to expand the box office and our ticketing
[3:58:10]
services with inclusion of the RCA appable. Elk Stadium and
[3:58:15]
Ubco. Including ticketing partnerships with Clona Falcons, Okanagan sun and
[3:58:21]
Ubco Heat and one of the great Advancements this year
[3:58:25]
was an agreement with Ubco Heath for the Heat games.
[3:58:28]
In 2025, we processed over 200,000 tickets for nearly 300
[3:58:33]
community events throughout the box office. In terms of continuous
[3:58:38]
improvement. The continued development of the cultural plan. This plan
[3:58:42]
will incorporate lessons learned community feedback and emerging trends. To
[3:58:50]
shape the future of our cultural landscape. Also another one
[3:58:55]
to highlight is the continued development. Of our nonprofit governance
[3:59:00]
and capacity building annual conference. This event has started off
[3:59:04]
as a learning opportunity to one day event attracting over
[3:59:09]
350 participants from over 135 not for profit organizations from
[3:59:13]
the sectors of sport, recreation, culture and social. Numerous educational
[3:59:20]
opportunities and dynamic speakers. The goal again is to continue
[3:59:24]
to support the development of a strong nonprofit sector, and
[3:59:27]
in turn, deliver programs and services to the community. That
[3:59:32]
we all benefit from. A couple performance measures to highlight.
[3:59:36]
The first one is the arts and culture investment per
[3:59:39]
capita. This measurement recognizes. That sustained in response to funding
[3:59:46]
is essential to ensure programs and services grow alongside our
[3:59:49]
population and continue to enrich the community. As costs rise
[3:59:53]
and expectations evolve, maintaining strong investment will be critical in
[3:59:57]
achieving the goal set out. In our cultural plan. Along.
[4:00:01]
Sec. You may recall from last year a long standing
[4:00:04]
industry benchmark for Missville and arts and culture. Investment has
[4:00:07]
been $25 per capita. This hasn't been adjusted through annual
[4:00:16]
increases, and we've pulled it out and through. The course
[4:00:18]
of updating the culture plan, we're going to have a
[4:00:21]
relook. At what the benchmarks for us should be. Another
[4:00:24]
one to look at is the leverage. Investments in the
[4:00:27]
arts and culture local, not for profit. Arts and culture
[4:00:30]
programs or groups use city funding to attract additional revenue,
[4:00:35]
such as grants, sponsorship, government support and earned income. This
[4:00:40]
indicator shows how early investment helps sustain organizations and diversify
[4:00:44]
their. Funding. With the aim to continue increased leverage dollars
[4:00:48]
and expand clonish creative sector and economic impact. The final
[4:00:53]
two deal with KCT. The first one is the average
[4:00:57]
fill rate. So the fill rate refers to the percentage
[4:00:59]
of tickets sold to. Main stage performances compared to the
[4:01:05]
capacity for audience. The rate provides one indicator that the
[4:01:10]
shows being offered are of interest to the community members
[4:01:13]
and shows our right size for the venue. The goal
[4:01:16]
would be to maximize the average fuel rate while balancing
[4:01:19]
our goal and cultural development by supporting less popular genres
[4:01:24]
and emerging performers. So it's finding that right balance. And
[4:01:27]
the final one is. The kct. Revenue. And it includes
[4:01:32]
income from theater rentals, front of house operations and other
[4:01:35]
sources of revenue recovery. The financial measure is important for
[4:01:40]
the city to show how clonic community theater supports the
[4:01:43]
city's economy and cultural life. So. Arts and culture service
[4:01:49]
area has an $8.6 million expenditure budget for 2026. And
[4:01:55]
operates under four cost centers. Funding for this. Service area
[4:02:03]
is made up of property taxes, transfers from reserves and
[4:02:07]
fees, and charges. The 2025 revised budget with $7,551,000 and
[4:02:16]
after the annualization of previously approved budget requests. The service
[4:02:20]
area will start 2026 with the operating budget of 5,475,000.
[4:02:28]
To maintain current service levels, an additional $1,076,000 is being
[4:02:33]
requested. And to enhance service levels. An additional $2,010,000 is
[4:02:42]
requested. This service area has no priority one operating budget
[4:02:47]
request this year. The 2026 capital Program is fully in
[4:02:54]
alignment with the council adopted tenure capital plan. That is
[4:02:58]
fully funded. And at this time, I just want to
[4:03:01]
make a note for council. That, as council is aware,
[4:03:05]
we move to cash flow budgeting for the capital plan
[4:03:09]
over the last couple of years and. As part of
[4:03:12]
that. Includes every year updating timelines for project delivery. So
[4:03:16]
some of the items that are being shown here in
[4:03:18]
the 2026 year are actual budgets that were already in
[4:03:23]
budget in 2025. But the project will not be completed.
[4:03:27]
And so is being pushed forward into 2026 instead of
[4:03:30]
there being a carryover brought forward. To council in the
[4:03:33]
spring. Is there any budget request that council would like
[4:03:36]
to discuss further? Thank you for that, clarification. On those
[4:03:40]
items. I think that's just good clarification because I know
[4:03:43]
that those are items that we approved in the past
[4:03:45]
and there just haven't been distributed out. Yet at this
[4:03:48]
particular point in time. Councilor Lovegrove, please. Thanks, you, worship.
[4:03:53]
A couple of questions, actually. Page 254, the performance indicator.
[4:03:58]
Number four community theater average. Phil is the estimated 2025
[4:04:03]
fill rate lower because of memorial cup in DC Lions,
[4:04:06]
page 254 sorry, the. Performance indicator. Four. Is that expected
[4:04:14]
to dip? Because we've got the big events coming to
[4:04:17]
town number four. Mr. Gabriel, we have someone behind you
[4:04:22]
who could maybe help with that question. So the question
[4:04:26]
again, please. The question is, why would it go from
[4:04:29]
66.6 actual 2024? To a forecast 61.6%. 2025. Christine, please.
[4:04:37]
Or maybe that's a CCMA. Actually, that's this year. That's.
[4:04:39]
Not next year, your worship, this is only at. Clone
[4:04:43]
community theater. So those events you're speaking of are not
[4:04:46]
impacting the clunky. Theater. The reason is that the fill
[4:04:49]
rate decreases when we have more rentals, so more space
[4:04:54]
becomes available. So the rental number needs to be considered
[4:04:58]
with the number of rentals needs to be considered. Because
[4:05:01]
there's more tickets available for sale, so it slightly decreases
[4:05:04]
when we have more rentals oh, interesting. So this year
[4:05:07]
was a great year for rentals. Just didn't have as
[4:05:09]
many sellout crowds. Your worship. 67% fill rate means that
[4:05:14]
across all bookings, across the whole entire theater, 67%. Of
[4:05:18]
the seeds are sold, which is actually quite a high
[4:05:20]
fill rate considering we have a large number of community
[4:05:23]
events that might have three or 400. So it depends
[4:05:25]
what those additional rentals would have been, that might have
[4:05:27]
lowered the fill rate, might have been a 300 rental,
[4:05:30]
which now brings it slightly down. Overall, we have a
[4:05:33]
very strong fill rate and a strong rental in the
[4:05:37]
theater. Certainly meeting the target in 2024, but dipping in
[4:05:40]
2025, which is this year, actually, so I probably shouldn't
[4:05:44]
wait for 2026, which forecasts calling them back up again.
[4:05:48]
I was noticing a dip. Not to believe or the
[4:05:51]
point. Let's move on, if that's okay. The city's signature
[4:05:55]
sign. This is an enhance, and I'm wondering if we
[4:05:59]
should start this one. Your worship. Council is already approved
[4:06:03]
it. 's one of the ones that Melanie was speaking
[4:06:10]
about that it's just bringing it forward into budget for
[4:06:12]
this year, but it's already been approved and we begun
[4:06:14]
commissioning and design on the project. Commissioning design, but we
[4:06:17]
haven't actually approved construction yet. You've passed resolution to give
[4:06:22]
counsel or give staff direction to proceed. Yes. Okay, then,
[4:06:26]
I guess. Appreciate that. Thank you, Mr. City manager. The
[4:06:33]
$100,000 for the Colonial Performing Arts center. So that's page
[4:06:36]
two. 60. It's just a feasibility study. Given what we
[4:06:40]
just passed earlier. We're not going to design. That's only
[4:06:46]
$100,000. That's all we need for 2026. You might have
[4:06:51]
to repeat the question. The $100,000 on the Colonial performing
[4:06:59]
arts center seems a little light. I thought, based on
[4:07:02]
what we had approved as a council. We were going
[4:07:04]
closer to design. Is it just a feasibility study business
[4:07:07]
case, and that's only. All we need is $100,000. That's
[4:07:11]
what it is. Correct. Just for the continuing on what?
[4:07:14]
The feasibility study. Okay. And then, Mr. City manager, I'm
[4:07:19]
going to stand and be corrected on this last question.
[4:07:22]
And that is. The North City entry monument. Is that
[4:07:26]
one that we've already approved? That's correct. Both of the
[4:07:28]
same, and I will just back right off. Thank you,
[4:07:30]
worship. Thank you, councilor. Cannon, please. Just on the city's
[4:07:36]
signature signage last year was 500,000, covering design, fabrication, insulation,
[4:07:41]
permits and other associated costs. So now it's 900,000. You
[4:07:47]
correct, your worship, the sign itself. Is within the budget
[4:07:51]
that was originally presented. As it's being built out. We
[4:07:54]
were doing a bunch of flat work and prep around.
[4:07:57]
The area to expand the footprint where it can be
[4:07:59]
placed. So. That's the preparation work and the work surrounding
[4:08:04]
it in Stewart Park. Mr. Sas, please. Thank you, your
[4:08:09]
worship. Just to provide a little bit more of an
[4:08:11]
overview. That, Mel provided we're in the middle of changing
[4:08:18]
our capital plan to operate more like. Our operating plan,
[4:08:23]
where, with our quarterly amendments and cash flow reporting, the
[4:08:26]
budget updates kind of automatically through those processes as we
[4:08:31]
are kind of in the middle of switching to cash
[4:08:32]
flow from a capital perspective. Some of these items that
[4:08:36]
you are seeing today are actually a function of that
[4:08:38]
which is we had too much budget in last year,
[4:08:41]
not. Enough in next year. And so these requests are
[4:08:45]
actually just moving budget from this year into next. Year
[4:08:48]
to facilitate that cash flow. Next year, this will not
[4:08:51]
be an issue, as we will be. Fully onboarded with
[4:08:54]
the capital cash flow, but that's what you're seeing. What's?
[4:08:57]
Causing a little bit of confusion right now. I hope
[4:08:59]
that clarifies. City manager, please. And one other point, because
[4:09:04]
I can anticipate the question coming. When will we see
[4:09:06]
this infrastructure in place. We are hopeful for next summer
[4:09:11]
for both of these signatures or both these signs that
[4:09:13]
council is approved. Just on last year. I had looked
[4:09:18]
at last year's budget. We had approved 1.3 million for
[4:09:21]
place making. I had note that 850,000 of that was.
[4:09:25]
For the entrance sign. So I'm just wondering what the
[4:09:28]
1.3 million was used. For then. Mr. Edstrom, please.
[4:09:41]
Your worship as to. The 1.35. I'd have to get
[4:09:47]
a bit more detail. I can confirm the. $850,000 for
[4:09:51]
the north end monument remains the same. Yeah. You want
[4:09:55]
to look at page 252 of last year's budget? I
[4:09:57]
don't have. Last year's budget right in front of me.
[4:09:58]
Right now, I have to finance I'm assuming it is
[4:10:01]
850 plus $500. 1.3 million was for because. Duplicate, I
[4:10:08]
thought was $500,000 for the one sign and 850 for
[4:10:11]
the other. That was 1.3 million. But now we've got
[4:10:13]
separate entries for both of those, which is another 1.3
[4:10:16]
million. Mr. Sass. Thank you. Maybe you can give us
[4:10:24]
a moment. The team's currently digging into last year's. Budget
[4:10:26]
and doing it on the fly. Reconciliation, 1 second. And
[4:10:29]
the last question is colonial. Performing arts center, so 100,000.
[4:10:34]
That's for your task force. And do you have a
[4:10:36]
budget already? Your budget that you had some allocated before.
[4:10:43]
For the task force for the new Performing Arts Center.
[4:10:49]
The amount of capital that this council approved. Was. Million
[4:10:55]
dollar amount. In order to do the preliminary stages of.
[4:11:00]
That process. Rate at this particular point in time. The
[4:11:05]
only cost associated that we've used is the cost associated
[4:11:09]
with reverie architecture assisting us. In coming with the plans
[4:11:16]
that came before council earlier this week. Which is a
[4:11:20]
very small percentage of that amount of money. So I'm
[4:11:23]
just wondering. You used that million. That was for capital
[4:11:26]
for no. I'll let the city. No, it was not.
[4:11:30]
That was something that council approved and came. To council
[4:11:33]
in great depth, but that million was for design and
[4:11:37]
architectural work. When we get to that stage, and we're
[4:11:39]
not anywhere near that stage at this point in time.
[4:11:43]
So I guess what money had we been using then
[4:11:44]
to pay for revelery? We've. Been drawing on the approved
[4:11:48]
money by council, so we drew on that million to
[4:11:52]
pay reverie. But there's still substantial amount left because wherever
[4:11:55]
we was not doing the design, they were doing conceptual
[4:11:58]
work, and that's where this request would be funded from.
[4:12:01]
Thanks. Mr. Sass, please. Thank you, your worship. And thanks
[4:12:08]
to the finance team putting the little quick reconciliation together.
[4:12:13]
So the 1.3 million for place making included four projects.
[4:12:17]
One of them was to do with the art walk.
[4:12:22]
Noel's Heritage park. There were some funds. To start the
[4:12:26]
crane workers memorial. North End City monument for 850,000, which
[4:12:31]
is what you see here. As well as. Some design
[4:12:35]
money for 250,000 for the Stuart park signature sign at
[4:12:39]
that time. Excuse me, council, your lights not on? You
[4:12:42]
have request for 850 for reserves for the north end.
[4:12:45]
Entrance. You had it in last year's budget. Thank you.
[4:12:54]
Thank you, your worship. Yeah. As we just discussed. That
[4:13:02]
cash flow is being moved from last year to this
[4:13:04]
year. Sorry. From this year to next year is what
[4:13:07]
I should say, which in the future will not. Show
[4:13:09]
as it ends up being there, changing the accounting structure.
[4:13:11]
So it's just kind of like a flow through overcrossed.
[4:13:16]
Seeing. No further questions. Thank you. Mr. Gabriel. Thank you
[4:13:25]
very much. To you and to the whole team for
[4:13:31]
everything that we have been doing. We definitely know that.
[4:13:34]
We have been putting some weight upon your shoulders with
[4:13:38]
regards to the activation that has been happening. Within the
[4:13:40]
community. And on behalf of myself and on behalf of
[4:13:44]
council, truly appreciate all the teamwork that is. Being done
[4:13:48]
to make those events successful. Thank you very much. Mr.
[4:13:51]
Smith. Good afternoon, your worshiping council. The community development service
[4:13:57]
area is made up of four distinct teams that span
[4:14:01]
two divisions. Mr. Gabriel's division in my division. They include
[4:14:05]
a climate and environment team, the housing policy and programs
[4:14:08]
team, the social development team, and the long range planning
[4:14:12]
team. And I'll give you an overview of what they
[4:14:16]
do and where they're headed. Today in budget. Some key
[4:14:20]
accomplishments from the 2015 year across these teams. With the
[4:14:25]
completion of the north end plan, The establishment of internal
[4:14:30]
and external working groups to support the implementation of the
[4:14:33]
climate resilient colonial plan. The delivery of. 60 rapid transitional
[4:14:39]
housing units under the Harden Hearth program. Partnered with the
[4:14:42]
province for a total of 180 units, and I'd be
[4:14:45]
remiss. If I didn't point out that the three sites,
[4:14:48]
each 60 units, Were all provided by the city of
[4:14:51]
Kelowna on our land. We also initiated the community information
[4:14:58]
library, community housing information library. Project a streamlined and update
[4:15:03]
city housing data practices, including the housing dashboard. So we
[4:15:06]
now have a robust housing dashboard on our website to
[4:15:10]
track our housing stats. And in terms of being able
[4:15:14]
to report out on those and make progress and report
[4:15:17]
on progress. Whether we're making progress or have challenges in
[4:15:20]
some areas in direct future policy, it's. A fantastic tool
[4:15:24]
and one of the more robust dashboards in the country.
[4:15:28]
In terms of continuous improvement. The social development team is
[4:15:34]
looking at. Basically a lot of their data right now
[4:15:39]
from shelters is a good example, comes from VC housing.
[4:15:45]
Or different nonprofits, and so an effort to ensure that
[4:15:49]
they're getting good quality data. Across the social service sector.
[4:15:54]
Is a major focus for the year ahead, as well
[4:15:57]
as advanced planning for extreme weather and disaster. Driven events
[4:16:00]
to ensure vulnerable populations are cared for. Expanding and improving
[4:16:04]
on indicators to support better measurement of climate environmental performance.
[4:16:08]
Our climate environment team launched a dashboard to track the
[4:16:12]
implementation of the climate resilient colonial plan this year and
[4:16:16]
to ensure that we can report out and provide community
[4:16:19]
transparency long term. Increasing across those initiatives. Better dashboard data
[4:16:24]
is a major priority. Also, we have a final bullet
[4:16:29]
seeking funding sources to advance key initiatives and expand departmental
[4:16:32]
resources. Sounds a little nebulous. And it's a fancy way
[4:16:35]
of saying keeping. An eye on grant opportunities that are
[4:16:40]
available out there, whether that is the housing accelerator fund
[4:16:44]
for example that can help support the various operations of
[4:16:47]
our teams without putting that cost on the taxpayer. In
[4:16:51]
terms of performance measures through these teams. I'm just going
[4:16:54]
to highlight a couple. Under performance measure two greenhouse gas
[4:16:59]
emissions. We can see the per capita emissions. Starting to
[4:17:03]
go down. I would note that there's always a lag
[4:17:06]
in this data. Through our consultants. And so this is
[4:17:09]
normal that we're only reporting out on 2022? To this
[4:17:11]
point. You can also see. Again. Some overall gyps during
[4:17:17]
the Covid period, where there was certainly less traffic on
[4:17:21]
our roads. In terms of overall growth in the OCP,
[4:17:26]
if you look at performance measure three, making sure that
[4:17:30]
our growth. Growth is predominantly happening in our urban centers.
[4:17:34]
In core area. We're right on target, if not a
[4:17:36]
little bit above for that performance measure, which means the
[4:17:39]
OCP is working. A lot of the growth, whether it's
[4:17:43]
residential or commercial or industrial. That councils and staff work
[4:17:48]
towards is going in the right spots and is consistent
[4:17:50]
with that plan. From a new housing standpoint, which would
[4:18:00]
be performance measure five. Interesting data here and trying to
[4:18:05]
make sure that. We track how much of our new
[4:18:09]
housing is of what type, and when we look at
[4:18:12]
this is more economy driven than anything we look at.
[4:18:16]
2025 estimate going up from 76% to 84% and then
[4:18:20]
to a 90% forecast. That really shows right now that
[4:18:24]
a lot of our housing is apartment housing that's being
[4:18:27]
delivered because it's heavily incentivized through all three levels of
[4:18:31]
government. And what we're not seeing there is. Much infill
[4:18:37]
single family like small multifamily construction going on because it
[4:18:41]
doesn't have the same incentives in place. So not a
[4:18:44]
bad thing, just an interesting characteristic of the data. Moving.
[4:18:50]
Into performance, measure six. Individuals transitioning from hardheart sites to
[4:18:55]
support if housing or market housing. Again, this is a
[4:18:59]
performance measure that really related to the importance of getting
[4:19:02]
good data from our social services sector in BC housing.
[4:19:06]
And I just wanted to point out an example of
[4:19:07]
that. These performance measures get better. And the information that
[4:19:10]
we can give counsel and make decisions on the future
[4:19:12]
gets better when. That gets better. So again, it's something
[4:19:14]
that we're looking to improve on all the time. And
[4:19:18]
then performance measure seven. Would be people experiencing. Unsheltered homelessness.
[4:19:25]
And key messages on that front right now is there's
[4:19:29]
1100 beds in Kelowna that span. From like a rapid
[4:19:34]
housing, shelter type housing all the way to transitional housing
[4:19:39]
and sort of everything. In between. And so a lot
[4:19:42]
of heavy lifting has been done in Kelowna over the
[4:19:45]
last few years to ensure there's a lot of housing
[4:19:47]
options in that area. And more to do on that
[4:19:51]
front as well. So I'm going to hand it back
[4:19:54]
over to Mel. Thank you. The community development service area
[4:20:01]
has an expenditure budget of $5.4 million for 2026. And
[4:20:06]
operates under four cost centers. The funding for the community
[4:20:10]
development is predominantly property taxes, with some from reserves, other
[4:20:15]
revenues and grants. 2025 revised budget was $5,171,000. After annualizing
[4:20:24]
previously approved requests, we're going to start 2026 at $4,644,000.
[4:20:33]
To maintain current service levels, an additional $336,000 is requested.
[4:20:38]
And to enhance service levels an additional 409,000. Is requested.
[4:20:46]
Service area has two priority one operating requests on page
[4:20:50]
276. First one for climate. And environment initiatives at $403,000,
[4:20:58]
which is funded from local government climate Action program funding.
[4:21:04]
And the second being 37,000 in 2026, increasing to 47,027,
[4:21:10]
then 57,000. Ongoing for the neighborhood association affiliation program funded
[4:21:16]
from taxation. This area of this area has no priority
[4:21:21]
one capital request and has one priority two request for
[4:21:26]
community Social development grant, an increase of $50,000 in 2026.
[4:21:33]
Increasing to $100,000 in 2027, then $150,000 in 2028. Ongoing.
[4:21:41]
Are there any priority one or priority two requests that
[4:21:43]
council would like to discuss? Councilor Stack, please. Thank you.
[4:21:49]
Your wish just goes back to the performance measures. Is
[4:21:51]
that right? So thanks, Ryan, for your report. I just
[4:21:54]
want to circle back to your comments on performance measure
[4:21:58]
number five, which is. Providing diverse housing options, and I
[4:22:02]
had flagged that one as we're looking to 2026. At
[4:22:06]
90% rental and I'd never thought these. Words would come
[4:22:09]
out of my mouth, but is that too much rental
[4:22:12]
in our city? I mean. We've been short for like,
[4:22:14]
20 years, but anyway. But when I see it hitting
[4:22:17]
90%, and that is a significant number. And I just
[4:22:20]
wondered if this indicator. Will then trigger us to review
[4:22:26]
some of our policies to see if they should be
[4:22:28]
modified in this next year for going forward. You, worship.
[4:22:33]
An astute question. And one that we're actually working on
[4:22:36]
right now. And when I say we're working on it,
[4:22:39]
we've been working on an infill. Barriers examination right now
[4:22:43]
to see. For that sort of anything that's less than
[4:22:46]
four units. What are barriers out there that are within
[4:22:50]
our control that we could bring forward to council to
[4:22:52]
discuss. Changes to those types of things, and so. That
[4:22:57]
will be Q one of 2026. That report coming for
[4:23:00]
council? Yeah, that's good. It's also. Great. Now that we
[4:23:05]
see these performance indicators, it's a really nice flag for
[4:23:08]
us to trigger us to do that very work, so
[4:23:11]
I'm glad to hear it's coming. Back in Q one.
[4:23:13]
Thank you. Councilor Lovegrove, please. Thanks, your worship. Actually, performance
[4:23:21]
indicators. Apparently that's subject to our questions. At least two
[4:23:24]
of my three. Can we at some point, given we've
[4:23:28]
got an urban forester and I believe in. One of
[4:23:31]
our previous reports. We were told there are going to
[4:23:33]
be some advanced tools we're going to use on urban
[4:23:35]
canopy. So indicator number one, this is page 264. Will
[4:23:40]
we at some point get year over year trends on
[4:23:42]
this. Do we know if they're going up? Down. We're
[4:23:43]
hopeful they're going up. That's our target. But how are
[4:23:46]
we. Doing? Your worship. Yeah, it's a tough measure, and
[4:23:51]
at this point, we've made a number of policy and
[4:23:55]
regulatory tweaks and what can actually continue to. And the
[4:23:59]
next steps would be like regular lidar. Reporting on that
[4:24:04]
analysis and reporting so that we could give counsel year
[4:24:07]
over year, or at least sort of every other year
[4:24:10]
data on that. That's not long term. So we're not
[4:24:12]
measuring out to 2050. We're seeing it and can track
[4:24:17]
areas where we're challenged and areas where we're making progress.
[4:24:20]
And so with the changes we've made and are making,
[4:24:24]
start to see progress over the next three or four
[4:24:26]
years. As new roads get built and they put in
[4:24:31]
more trees on the public right of way as new
[4:24:33]
developments occur and their tree planting requirements are higher than
[4:24:36]
in the past. For example. Thank you. Mr. Smith and
[4:24:39]
I think Chris just stood up to assist with regards
[4:24:41]
to some of the answers. On that question, councilor? Yeah,
[4:24:43]
you're worship. I'll just say that our team. Has come
[4:24:46]
and working with urban forestry is committed to kind of.
[4:24:48]
A three to five year cadence on the data for
[4:24:51]
urban updating. The urban forest canopy. It's expensive data to
[4:24:55]
get, so. Pretty onerous process. I think last time we
[4:24:58]
spent upwards of over $100,000, $120,000 to get the data
[4:25:03]
through Lidar. And then analyze it. So right now, we're
[4:25:05]
kind of committing more to that three to five year
[4:25:07]
time. I understand. Okay. Thanks. This is going to be
[4:25:10]
my next is when, and so. Basically, I'm hearing three
[4:25:12]
years from now. But once we get. The data. I
[4:25:15]
sure hope it's a lot less expensive. Keep it up.
[4:25:19]
Is that a fair comment? Okay? Yes, I think so.
[4:25:21]
All right, thanks. So, second question, you, worship. Hold on.
[4:25:27]
There it is on number two. Perhaps don't sit down
[4:25:32]
too quickly because. The community. Greenhouse gas emissions. I apologize.
[4:25:37]
Everything else we've had the 2023 actual. 2024 actual 2025.
[4:25:42]
2026 27. Forecast. Is this just because it's coming from
[4:25:46]
the province that we can't show? That we don't even
[4:25:48]
have estimates. Correct, your worship? Yeah. As Mr. Smith mentioned,
[4:25:54]
the data is to your leg behind. We get our
[4:25:56]
data from the community. Energy and emissions inventory, which comes
[4:25:58]
from the province. BC we're luckier than most provinces. In
[4:26:02]
that we actually get data at the community level for
[4:26:05]
emissions. But it is a two year leg. And unfortunately,
[4:26:08]
we're kind of at the hands of the province on
[4:26:10]
that. All right. So I guess. Forego a question on
[4:26:15]
trends. Last question, you, worship. And this is actually a
[4:26:19]
p two question. I can hold off until we get
[4:26:21]
there if you'd. Like, but I do have a question
[4:26:24]
on page 278. As show. It'll be presented after the
[4:26:30]
py. Wait, please. Yes, thanks. Thank you. Please only. This
[4:26:39]
service area has one priority two request. The Community Social
[4:26:44]
Development grant. For $50,000 in 2026, increased to $100,000 in
[4:26:50]
2027 and then $150,000 in 2028. Ongoing councilor. As I
[4:26:57]
read this. It sure seemed like this should be a
[4:27:02]
maintained because in the past five years. We've had 118%
[4:27:07]
overspend, and we want to maintain that level of service.
[4:27:11]
We're just recognizing the actual cost. So I'm just wondering
[4:27:15]
why, number one, this is an enhance. And if we
[4:27:18]
know we're going to be there next year, should we
[4:27:20]
just bump it up right now. So I guess I'm
[4:27:22]
asking, should we start this for. Discussion later on. Councilor,
[4:27:25]
are you making a request to start? Do we have
[4:27:27]
a seconder? Question first. Sorry, apologies. So, councilor, you're going
[4:27:37]
to have to probably ask the question one more time,
[4:27:40]
because I don't think it was picked up as I
[4:27:42]
read this. On the second line. Of that description said,
[4:27:48]
it's just recognized. In the past five years, we basically
[4:27:50]
had 118 overspend. So to me this is more of
[4:27:54]
a maintain ask where we just recognizing the previous cost
[4:27:58]
overruns and let's plan for it instead of react to
[4:28:01]
it. So is that a fair comment that this is
[4:28:04]
really a maintain ask? You worked here just for clarity.
[4:28:08]
The 118% over is what been asked for. It's not
[4:28:11]
what's been. Provided. So we have a base budget within
[4:28:14]
our grant, and that's what we work within. And on
[4:28:17]
a regular basis. We get like with most grant areas,
[4:28:19]
you get more asks than what you're able to provide.
[4:28:22]
So that just forces us to kind of relook at
[4:28:24]
our priorities and make sure that we're deling them in.
[4:28:27]
I misread that. I understand. So you're. Getting asked to
[4:28:31]
give money at 118 above what you've been funded. Okay,
[4:28:36]
so then I. Will withdraw that request. Thank you so
[4:28:38]
much. Thank you, council. Cand is this around the p
[4:28:41]
two or just wanted to know what? The base budget
[4:28:43]
is. If I could, please.
[4:28:53]
231,000. Yeah. You, worship. The base budget is $231,000. Thank
[4:29:03]
you. Seeing no further comments. We can just move on.
[4:29:06]
I'm just going to make one comment. With regards to
[4:29:09]
performant measure number six. Obviously. The tiny homes, the heart
[4:29:17]
and hearth that we have in place within this community
[4:29:21]
to see. The actual success of that over the last
[4:29:26]
two years with regards to how it is moved forward.
[4:29:28]
Very grateful for that tracking. There has been some other
[4:29:32]
comments potentially made in the community that the success is
[4:29:36]
not as great. As it has been. So I'm very
[4:29:38]
grateful for that information to be there for us. So
[4:29:41]
thank you very much. Melanie, please. Next, we will move
[4:29:46]
into development services. This service area starts on page 279
[4:29:52]
of your budget volume. You worship. The development services service
[4:29:56]
area is comprised of building and permitting teams, development engineering
[4:30:00]
teams, and business licensing teams. They are one of the
[4:30:08]
busiest building departments and one of the most efficient building
[4:30:10]
departments in the country, and they're always excited to tell
[4:30:13]
you that. For. Their 2025 accomplishments, they implemented both a
[4:30:22]
new city works software program to replace legacy software. That
[4:30:27]
was about 35 years old, and so there was some
[4:30:30]
growing pains going along with that, that also included an
[4:30:34]
online building permit application submission portal allowing property owners to
[4:30:38]
submit building permit applications online. Onlinely as well as. Some
[4:30:44]
new payment options as well online. One of the other
[4:30:48]
services that we've moved online is our property information requests,
[4:30:51]
and so we've partnered with a third party service provider.
[4:30:55]
In a digital improvement to allow. Property related information to
[4:31:00]
be delivered. To mainly realtors, but sometimes banks and lawyers
[4:31:05]
in a more efficient way. And we are actually able
[4:31:08]
to redeploy staff within the division because of this digital
[4:31:11]
innovation to another area that required extra resources. So. Meaning
[4:31:17]
we're not coming to council for extra budget requests for
[4:31:20]
new bodies. One of the. Other highlights here is the
[4:31:26]
accreditation from the International Accreditation Service. For the building and
[4:31:30]
permitting team. I believe they remain the only accredited building
[4:31:34]
department in Canada and certainly. There are rigorous processes, and
[4:31:38]
attention to constantly reviewing and improving those processes goes a
[4:31:43]
long way, and shows in their service to our customers.
[4:31:46]
And finally. We had. Some key retirements. In that department
[4:31:51]
this year. And that led to a little bit of
[4:31:54]
reorganization and some succession planning that was necessary to be
[4:31:57]
done. So again, business has gone on through that division
[4:32:02]
without a blip, and we're not. Getting complaints about timelines.
[4:32:06]
In terms of continuous improvements. Update bylaws is a little
[4:32:10]
bit nebulous, but as a result of a lot of
[4:32:12]
the technology change. In the building and permanent team. We've
[4:32:18]
delayed the updates to various bylaws, and our building bylaw
[4:32:21]
would be one of them. So council could expect to
[4:32:23]
see that in 2026. And we've also updated some licensing
[4:32:28]
related bylaws and that started council saw one of those
[4:32:31]
in the last couple of weeks. In terms of policy
[4:32:34]
and procedures updates. Something that is ongoing is that provincial
[4:32:37]
government changed. Their legislation related to how and when DCCs
[4:32:42]
are collected as an incentive to development, which has required
[4:32:46]
some technology change and process change behind the scenes. So
[4:32:49]
that's an example of what we mean on that front?
[4:32:52]
And then. The software transition from our legacy software to
[4:32:58]
city works. I wish I could say that. Always smooth.
[4:33:01]
Sailing, but lots of little pieces that are getting resolved
[4:33:03]
behind the scenes. And one that I set out in
[4:33:06]
this week was an update on the financial reporting to
[4:33:08]
make sure that we're getting accurate financial reporting from the
[4:33:12]
new software system to our finance team. So that's delaying
[4:33:15]
some of the software implementation that will move into our
[4:33:18]
development planning team. That will happen next year. From a
[4:33:23]
performance measure standpoint. I'll touch on a couple of different
[4:33:26]
areas here. Fast track building permit program issuance for building
[4:33:31]
permits within two days. This is a service that differentiates
[4:33:34]
Kelowna from many other municipalities in British Columbia and Canada
[4:33:38]
is our ability to get those to get simple permits
[4:33:41]
out very quickly and not let them bug up our
[4:33:44]
system. When you look at. So that would be PM
[4:33:48]
number 03:00 p.m. number four. Business licenses issued within two
[4:33:52]
weeks. We see that a goal of over 80% there,
[4:33:56]
but hovering sort of between 75%, 70%. And the reason
[4:34:02]
for that is we have permit types that we've introduced
[4:34:05]
over the last few years that are a little bit
[4:34:06]
more labor intensive and so there's been more effort that
[4:34:09]
staff are putting into the review. And inspection. And a
[4:34:11]
good example would be short term rentals. And so getting
[4:34:15]
five or 600 short term rental license applications and making
[4:34:19]
sure that the parking spots are adequate, that there's been
[4:34:23]
a coordination with the province. The number of bedrooms is
[4:34:26]
right. We take a look at the floor plans for
[4:34:27]
the house. We have the right documentation from stratas. If
[4:34:31]
we need all that information. Slows down that issuance sometimes.
[4:34:37]
But by and large, we do get, if you look
[4:34:38]
at that number and put it in context. We get
[4:34:41]
between eleven and 12,000 business license applications. A year, so.
[4:34:47]
Having between 69 and 70%. Issued within two weeks. That's
[4:34:53]
a pretty. Good amount. And just on the development engineering
[4:34:59]
front, tracking like PM number six. Tracking the engineering drawings
[4:35:03]
approved within two submissions. Our development engineering manager is spending
[4:35:09]
quite a bit of time working with the consulting engineering
[4:35:11]
community to raise the quality of the submissions so that
[4:35:15]
we can approve them more quickly. It's been common in
[4:35:18]
the past for staff to do five, six, seven revisions
[4:35:22]
with a local civil engineer to get it to sort
[4:35:25]
of the level that. Staff need to approve those plans
[4:35:29]
and when we can do it. Into each of the
[4:35:32]
staff members, then we don't need to add resources to
[4:35:35]
the division. We can do more with fewer staff members
[4:35:37]
when there's fewer submissions or revisions necessary. The development services
[4:35:42]
service area has an expenditure budget of $7.6 million in
[4:35:48]
2026. And operates under five cost centers. The funding strategy
[4:35:55]
for. This service area is predominantly fees and charges. With
[4:36:01]
$1.2 million coming from transfers from reserves. The 2025 revised
[4:36:07]
budget was $7,441,000. After the annualization of previously approved budget
[4:36:15]
requests, we're starting 2026 with a budget of $7,208,000. To
[4:36:24]
maintain current service levels. This service area is requesting an
[4:36:29]
additional $368,000. And to enhance service levels, an additional $9,000.
[4:36:38]
This service area has no priority one or priority two
[4:36:42]
operating or capital request. Is there any questions that council
[4:36:47]
has for Mr. Smith? Thank you. Seeing no questions, please
[4:36:51]
move forward. Well, next we'll move into development planning. This
[4:36:57]
section starts on 287 of your budget volume.
[4:37:08]
The development planning service area is responsible for the review
[4:37:10]
and evaluation of new development related applications that involve sort
[4:37:16]
of the future planning of our city, so. That commonly
[4:37:19]
be rezoning development permit applications. Temporary use permit applications sometimes
[4:37:24]
changes to our official community plan. Maintenance of the zoning
[4:37:28]
bylaw, things like that. In terms of key accomplishments. The
[4:37:35]
development planning team. Worked with our zoning bylaw to help.
[4:37:42]
Put incentives in place to help facilitate rental housings along
[4:37:47]
with provincial and federal programs. We've seen the vacancy rate
[4:37:51]
increase to 3% this past year than the last reporting
[4:37:53]
period, and it's likely to rise again. In the next
[4:37:57]
reporting period, which I'm told will be in the next
[4:37:59]
few weeks. We've actually changed our planner of the day
[4:38:03]
and planning tech role in the department to reduce some
[4:38:07]
low value tasks. And redirect efforts to improve service delivery
[4:38:13]
to customers who have paid for development applications and reduce
[4:38:15]
interruptions for staff. We've done a couple of council workshops.
[4:38:20]
That were high profile over the year. So one, parking
[4:38:24]
strategies. So we did two workshops on that with a
[4:38:26]
consultant and a third coming. For council Monday morning of
[4:38:29]
next week. And as well, we did a number of
[4:38:34]
infill related workshops for council over the year. In terms
[4:38:39]
of continuous improvements. The planning team development planning team is
[4:38:43]
working on review of their short term rental program because
[4:38:47]
our vacancy rate. Is over 3% now for their second
[4:38:52]
year, and council has provided direction to move forward with
[4:38:56]
a bit of a hybrid mating Kelowna approach. To seeing
[4:39:00]
a little bit more short term rental housing or short
[4:39:03]
term rental accommodation on the market. So we continue to
[4:39:05]
work through that in the first quarter of 2026. We've
[4:39:10]
did a little internal process review. And so, like. The
[4:39:15]
development services division in their accreditation. There isn't the same
[4:39:19]
type of accreditation for planning that we did have a
[4:39:21]
consultant do sort of an initial review with the development
[4:39:24]
community and suggest some improvements internally, so we're going to
[4:39:26]
be working on some of those. In 2026 with a
[4:39:31]
staff member who has some time devoted in their work.
[4:39:33]
Plan for that. We'll continue to work on the refinement
[4:39:37]
of the Density bonus program with council. And we've got
[4:39:41]
a number of zoning bylaw updates that are more maintenance
[4:39:44]
related coming for council related to concerns we've heard with
[4:39:49]
the rollout of Bill 44. So tweaking some of the
[4:39:52]
zoning related to that and parts of buildings that are
[4:39:55]
impacts of buildings that are not very desirable in neighborhoods.
[4:40:01]
From a performance measure standpoint. I'll highlight a couple here
[4:40:04]
from council. PM number 2% development application streamlined approvals. What
[4:40:10]
this means is the component of our components. Of our
[4:40:13]
development application process that staff can approve at a staff
[4:40:16]
level and don't need. To come to council for an
[4:40:18]
approval, and so we've made a number of process changes.
[4:40:22]
And the provincial government has made process changes over the.
[4:40:26]
Last few years, and so right now, 70% of our
[4:40:30]
approvals can be done in a streamlined manner, and that
[4:40:33]
could be development. Variance permits. Are provable at a staff
[4:40:37]
level. Lower scale form and character development permits. For three
[4:40:43]
to six unit buildings or approved at a staff level
[4:40:47]
environmental and hazardous condition development permits. And delegated agricultural area
[4:40:52]
development permits as well. We don't expect any more requests
[4:40:57]
in the year ahead for delegations, and so we expect
[4:41:00]
that to remain relatively constant. And there may be areas
[4:41:04]
where we want to discuss with council refining that balance
[4:41:07]
further in the future if there's areas that aren't working
[4:41:09]
for council. The other one was percent. Residential building permits
[4:41:16]
in growth districts and another OCP alignment. Indicator. And what
[4:41:22]
we try and make sure of is that our policy
[4:41:24]
and planning team, that. Are in the community development service
[4:41:28]
area, set the high level policy and development planning implements
[4:41:31]
that policy and so in the areas where we expect
[4:41:34]
growth, are they directing growth to the right areas? The
[4:41:38]
development planning service area. Has an expenditure budget of $2.9
[4:41:44]
million in 2026 and is operated under four cost centers.
[4:41:50]
Funding for this service area is predominantly property taxes, with
[4:41:54]
$900,000 coming from fees and charges. The 2025 revised budget
[4:42:01]
was 2,841,000 after annualization of previously approved budget request. The
[4:42:08]
2026 year will start at 2,711,000. To maintain current service
[4:42:16]
levels, an additional $187,000 is being requested. And to enhance
[4:42:21]
service levels, an additional $3 million. This service area has
[4:42:27]
no priority. One operating or capital request. Is there any
[4:42:33]
questions from Mr. Smith that council would like to bring
[4:42:36]
up now? Councilor saying comment. Councilor comments? Councilor can in
[4:42:42]
question. Yeah, thanks, Mr. Smith. I just wanting in your
[4:42:44]
work plans for 2026. Working on the area structure plan
[4:42:50]
for McKinley and North UBCo. Without becoming council as well.
[4:42:56]
And also possible area structure plan. For the area. Around
[4:43:01]
Kasor. So inland Franco area. Your worship staff continued to
[4:43:05]
work. With the applicant team on the North Glenmore sector
[4:43:10]
study, and there'll be a reporting. Touchpoint with council on
[4:43:14]
that in January of 2026 that staff introduced, but it
[4:43:19]
will be applicant led, so you'll see that right away
[4:43:21]
in the new year. In terms of. Other study planning
[4:43:25]
study areas in 2026. There's nothing on our radar at
[4:43:29]
this point, and I would say we don't. Actually have
[4:43:32]
the capacity to do more. At this point, we'll probably
[4:43:34]
need to finish up. The North Glenmore before we dive
[4:43:37]
into another one. Toll call as well. Right. Good. Thank
[4:43:41]
you. Seeing no further questions. Comments Councilor Singh. Yosh, but
[4:43:47]
I just want to commend Mr. Smith and his team
[4:43:49]
for the work. They do. We're just heads down as
[4:43:54]
his team is. Hard at work. It wasn't until I
[4:43:58]
went to UBCM and I heard. From counselors and other
[4:44:01]
municipalities. Commending us for the speed with which we move
[4:44:07]
applications, how professionally and how advanced. Our staff as and
[4:44:12]
our processes, so I just wanted to throw it out
[4:44:15]
there. And thank staff for. Their work and their diligent
[4:44:21]
efforts in making things happen. Councilor Lovegrove. Well, you beat
[4:44:27]
me to it, but I'm going to say the fact
[4:44:28]
that. We're expediting approvals, permits, inspections. Is not to say
[4:44:33]
we're skimming over. We're actually doing a quality job at
[4:44:37]
the same time. And so let me add my kudos
[4:44:39]
in that regard. I just appreciate how much smarter you're
[4:44:43]
working through reorganizing your processes, your organization, and updating your
[4:44:47]
technology. So you can do all of that. My one
[4:44:50]
ask is that the urban tree canopy data be a
[4:44:54]
budget item for next year, not wait three to five
[4:44:57]
years because that's two departments that nothing's come forward, so.
[4:45:00]
Thank you. Thank you, thank you. Mr. Smith. Thank you.
[4:45:04]
Just echoing the comments that were made by the rest
[4:45:07]
of council. Appreciate, definitely, truly appreciate the work that you
[4:45:12]
and your department does. Thank you very much. Thank you.
[4:45:16]
Melanie, please. Thank you, your worship. Next, we're going to
[4:45:20]
move into the parking service area, and we are going
[4:45:22]
to welcome the divisional Director of partnerships at Investments, Mr.
[4:45:26]
Derek Edstrom. Thank you. Thank you, Melanie. It's a pleasure
[4:45:35]
to be here today to talk about parking. Services parking
[4:45:39]
services operates under five parking management principles endorsed by council
[4:45:43]
in 2014 following a thorough public engagement process. As in
[4:45:47]
years past, our efforts as a year focused on excellent
[4:45:51]
in short term parking management financial self sufficiency excellence in
[4:45:56]
customer service, facilitating. Economic growth and supporting a balanced transportation
[4:46:01]
system. Key accomplishments included bringing internal and external staff and
[4:46:07]
contractors together underneath one roof at our new St. Paul
[4:46:11]
location. It is unique to. Have both our internal staff
[4:46:17]
work alongside contractors and just shows the commitment that Mr.
[4:46:21]
Duncan has had. Around making sure customer service. Is first
[4:46:25]
and foremost. We made significant investments in parcade renewal projects.
[4:46:30]
We continue to expand our sustainable offerings by installing ten
[4:46:34]
additional level two electric vehicle chargers in Rutland in South
[4:46:37]
Pandozi, which complements 20 public chargers already in operation. And.
[4:46:45]
The one that we are proud of as we continue
[4:46:46]
to look at alternative revenue as a city. And the
[4:46:49]
city manager identified our level of alternative revenue as a
[4:46:53]
whole. This area continues to operate in a prudent manner
[4:46:57]
and contributes $1.65 million. Per year to the general fund
[4:47:03]
as we look to continuous improvements. I guess new glasses.
[4:47:12]
Don't. Show everything as we look forward to continuous improvements.
[4:47:19]
We are focused on customer services. We identified. As well
[4:47:25]
as looking to make sure that. We have really good
[4:47:29]
information to make informed decisions. The parking services team has
[4:47:34]
really focused on the quality of data. That they take
[4:47:37]
in. And really, for our purposes, it's not just to
[4:47:40]
know what we're taking for long term planning. But eventually,
[4:47:44]
as we move to more dynamic pricing in the future,
[4:47:47]
we will have to make decisions going forward with our
[4:47:50]
parking services to either increase supply. Or to manage occupancy
[4:47:55]
by undertaking dynamic pricing. So a lot of effort has
[4:47:57]
gone into the background systems to make sure that we
[4:48:00]
can provide informed, evidence based decisions to counsel as we
[4:48:03]
bring those programs forward with respect to excellence in customer
[4:48:06]
service, we remain focused on improving the customer facing technology
[4:48:11]
this past year. The pay by phone app. That we
[4:48:14]
utilize when underneath renewal, there's a lot of work to
[4:48:17]
make sure that it was seamless for our customers. And
[4:48:20]
as a data point, We were one of the first.
[4:48:25]
To really implement and by, say, push forward, pay by
[4:48:28]
phone in Clona. So by the time we hit 2022,
[4:48:32]
we already got to 59% of all transactions were being
[4:48:35]
utilized by payby. Phone. I'm happy to say that now,
[4:48:39]
in 2025, we're projected to hit. 71% of all transactions
[4:48:43]
will be utilized by payway phone. And obviously. The. Benefit
[4:48:47]
is not only a good customer experience. But also reduced
[4:48:51]
infrastructure costs going forward by not having as many pay
[4:48:53]
stations that need to be maintained. Going forward. To performance
[4:49:00]
metrics. We have three performance metrics in parking that we
[4:49:04]
monitor closely. The first one follows the canadian municipalities municipal
[4:49:08]
median benchmarks. This is one that I think the team
[4:49:12]
can be proud of, but just shows our prudence and
[4:49:14]
how we operate in an efficient manner, not only parking
[4:49:18]
services, but I think. You see this? Similarly, across city
[4:49:21]
departments. In this one particularly, it's a revenue to cost
[4:49:26]
ratio. So the way to think about it is. The
[4:49:30]
amount of revenue. To how much it costs to run.
[4:49:34]
We are targeted at two. We have exceeded it this
[4:49:39]
year. And if you look at. The yellow dashed line.
[4:49:44]
That's the municipal benchmark. And you can see that we're.
[4:49:47]
Considerably higher than other municipalities and how efficiently we run
[4:49:52]
our operations. Performance metric. Number two is peak capacity of
[4:49:57]
parking stalls. Our target is 85%. This. Had been emboldened
[4:50:04]
when we brought forward our parking principles. 85% effectively means
[4:50:08]
for on street parking that at any given time, if
[4:50:11]
you were to drive around a block. There would be
[4:50:13]
one space that would be open. So we want to
[4:50:16]
make sure that we're balancing supply to make sure that
[4:50:19]
there's an availability. For our businesses in the area. We
[4:50:24]
are right on the verge of exceeding that. This is
[4:50:27]
an overall number now of 82.7% but. If we break
[4:50:31]
down to a couple of our areas. We know in
[4:50:34]
August. In downtown, we are at 93.5%. In South Pandozi,
[4:50:39]
we had 100%. In August, so we're starting to get
[4:50:42]
that conversation. About supply. Or changing our practices around demand.
[4:50:49]
Our last one, performance metric number three is blocks of
[4:50:51]
time limited. Or residential restrictions. As we continue to urbanize,
[4:50:56]
we are undertaking more blocks with residential restrictions and this
[4:50:59]
is a more pure measure of a service level improvement
[4:51:04]
where we're. Increasing the amount of infrastructure and the amount
[4:51:09]
of hours our staff. Are monitoring these areas and I'll
[4:51:14]
pass it back to Mel. The parking service area. Has
[4:51:19]
an expenditure budget of $13.2 million for the year it's
[4:51:24]
operated under two cost centers. Funding for this service area.
[4:51:30]
Is properties and charges, as well as some transfers from
[4:51:33]
reserves. The 2025 revised budget was $10,486,000 after the annualization
[4:51:43]
of previously approved budget requests. The service area is starting
[4:51:46]
2026 with a budget of 7,898,000. To maintain current service
[4:51:54]
levels, the service area is asking for an additional $5,114,000
[4:51:58]
and an additional $150,000 to enhance service levels. There are
[4:52:07]
no priority one operating request for the service area. And
[4:52:11]
their 2026 capital program is in alignment. With the council
[4:52:17]
approved ten year capital plan that is funded. Is there
[4:52:20]
any questions? For Mr. Edstrom? Yes, there are. Councilor Weber.
[4:52:26]
Questions. Yeah, it's about the South Pandozi parcade. Apparently it's
[4:52:32]
part of the ten year capital plan. By the way,
[4:52:34]
I was taken aback. By who? With the glasses. Who's?
[4:52:37]
That extra intelligent guy standing over there? Anyway, I keep
[4:52:42]
wondering about the south Pandozi, parcade. It seems to me
[4:52:46]
like a mystery project that keeps coming back every year,
[4:52:48]
and yet I feel like maybe I've forgotten, but I
[4:52:51]
don't remember council ever having a debate over where in
[4:52:53]
town. We've never been given a choice or options or
[4:52:57]
any kind of debate. Or a business case about why
[4:53:00]
the next parquet needs to be there and may be
[4:53:02]
true. But I haven't ever seems to have come. Before
[4:53:06]
us and it's being asked for 400,000 this year, and
[4:53:09]
then we're launching into almost like $18 million over the
[4:53:12]
next five years. So it seems to be it seems
[4:53:14]
to me it's going to become a fact pretty quickly
[4:53:17]
here. And yet. Maybe it's because it all started before
[4:53:20]
I was on council or something, but. It just seems
[4:53:22]
like something. There's an assumption we're going to do, but
[4:53:25]
we never said it. And councilor just says a point
[4:53:28]
there. I know Mr. Edson is going. To answer it,
[4:53:29]
but it did all start before you were on account.
[4:53:31]
So it did, Mr. Edstrom. Please. Yes, you, worship. It
[4:53:35]
did start before you're on council, and as part of
[4:53:37]
our area specific. Plans. We identified parking need based off
[4:53:41]
what we see, the current or the supply to be
[4:53:43]
in. Projected supply. So this came for the first time
[4:53:46]
before council last year. We heard loud and clear from
[4:53:49]
council. That they wanted this to come back to them.
[4:53:53]
Before any decisions were made. Up to now, staff have
[4:53:57]
undertaken preliminary design and are currently looking at an option
[4:54:01]
for it within the Osprey parking lot in south Pandozi.
[4:54:06]
That said. There is a conversation we're going to come
[4:54:10]
back to council on specifically with the data. Of what
[4:54:14]
will be the highest priority, because some of the numbers
[4:54:17]
we're starting to see in the downtown. Are increasing. And
[4:54:21]
so there will be a prioritization conversation that will happen
[4:54:24]
about where the next parcade should go, but we will
[4:54:27]
not move forward with spending anything more than design money
[4:54:31]
before we come back to council for approval. I want
[4:54:34]
to make sure that's very clear that there's a condition
[4:54:36]
associated with that. I appreciate the response. Councilor 1 second
[4:54:41]
city manager, please. Yeah. Thank you, worship. And maybe in
[4:54:44]
addition, Mr. Edson, speak to the property that we acquired
[4:54:48]
for this purpose. And when we acquired that for the
[4:54:50]
Pandozi perky. The property that is there is the osprey
[4:54:55]
parking lot. Osprey parking lot is. Right beside the park
[4:54:59]
in South Pandozi, and it has been identified for a
[4:55:02]
long period. Of time as being the potential for. A
[4:55:07]
future parcade. If council approved the project. So I'm not
[4:55:11]
quite sure how to approach this, but your report did
[4:55:13]
say that we're reaching. Parking. Your report just a few
[4:55:16]
minutes ago, you said we're reaching parking limits, both downtown.
[4:55:20]
And Pandosi, so certainly we need to move ahead. So
[4:55:24]
the question is, if we approve this $400,000 now, and
[4:55:27]
that's for. Planning purposes, that usually implies that the project
[4:55:31]
is going to go ahead, because otherwise you're wasting $400,000.
[4:55:35]
Would that be a way of looking at it? I
[4:55:37]
wouldn't look at it that way. Your worship from our
[4:55:39]
perspective. There's the feasibility to undertake long term planning. Regardless,
[4:55:44]
we want to make sure that whatever sites that we
[4:55:47]
are holding for parking purposes can actually work from a
[4:55:50]
feasibility perspective. So that includes just based geotechnical and then
[4:55:54]
having some massing, as you can imagine. Parcades.
[4:56:05]
Put in, say Lego is the wrong way to say
[4:56:06]
it, but effectively. They need to fit within a certain
[4:56:10]
box or rectangular, and we want to make sure that
[4:56:13]
it can actually be constructed and built within that space.
[4:56:16]
Before we come back to council, we know that. Is
[4:56:18]
a tighter space. That's one of the reasons for it.
[4:56:20]
Also, anything in the downtown as well. If it was
[4:56:23]
to come forward, we'd want to make sure that before
[4:56:25]
we make the recommendation to move to the next level
[4:56:27]
that has gone underneath. Gone. Underneath. Gone underneath the initial
[4:56:31]
feasibility analysis. What would that 400,000 be used to? Look
[4:56:35]
at more than just one location in the city for
[4:56:37]
a yes, it would have the ability to do that,
[4:56:39]
you, worship, but we're going to undertake the pandozi one
[4:56:41]
first. Yeah. And yet we're going to be at some
[4:56:44]
point debating at some point. You're? Coming back to us
[4:56:47]
with where options for where parcade is most needed. We
[4:56:51]
will have evidence backed information to make sure you can
[4:56:54]
make an informed decision. And as our commitment was before,
[4:56:57]
that we would not move forward. Beyond the feasibility stage.
[4:57:06]
Until we had council's blessing to move forward. Thank you.
[4:57:11]
Councilor stock, please. Comment on councilor Weber's question and then
[4:57:18]
a question. But. Council. There used to be a parking
[4:57:23]
lot in the middle of Pandozi, which included the site
[4:57:27]
of where now Canada is, and we took that parking
[4:57:31]
out in favor of providing supportive housing. To that community.
[4:57:34]
And at that time, I recalled her being a commitment
[4:57:37]
to the business community out there that we would replace
[4:57:39]
that space. Which is why we bought Osprey and then
[4:57:43]
used that as future enhancement. So it does. Go back
[4:57:46]
about 18 years ago, the root of this. But the
[4:57:50]
objective was to make sure that there was adequate parking.
[4:57:52]
Depends the area through parking management. I think there's been
[4:57:56]
huge improvements. In that area. But that is part of
[4:57:59]
the history of it, so I'm not surprised to see
[4:58:01]
this. Come in. But it has had such a long
[4:58:03]
history. Sometimes it's easy to forget how we got here.
[4:58:08]
Anyway, my question. Is on the budget. I noticed on
[4:58:13]
page 299, Melanie, we have a transfer from reserves of
[4:58:18]
3,000,818. As a revenue. But then when I went further
[4:58:24]
down the page, we have transferred to reserves of 3,000,655.
[4:58:27]
And it just seemed like an interesting accounting thing, and
[4:58:31]
I'm just curious. To the story behind that. Thank you,
[4:58:35]
worship. When we put money into reserve, it is typically
[4:58:41]
for future capital. So most of the time when you
[4:58:44]
see money coming in that line of transfer from reserve,
[4:58:47]
it is coming in to fund that. Capital work with.
[4:58:54]
The parking operation. Money that is received that is not
[4:58:58]
used within the year in the operations of that year
[4:59:00]
get contributed to that reserve and then are used for
[4:59:03]
future capital. So. It's just like old money. Old revenues
[4:59:08]
coming in to pay for today's capital. And today's money
[4:59:11]
going into reserve to pay for tomorrow's capital. I knew
[4:59:14]
you'd. Have a good answer. Thank you. Thank you. Councilor
[4:59:19]
Dehart, please. I have a comment. If everybody else was
[4:59:23]
finished. Hold. Questions? Councilor Singh. Questions? Yes. Thank you, worship.
[4:59:30]
I just wondered. I may be drawing a blank here.
[4:59:36]
Did we not talk about a parcade in Rutland? Or
[4:59:39]
was it last term or this term? It's sort of
[4:59:42]
all rolling into one. Wasn't that an issue at one
[4:59:45]
point? Councilor. No. All right. I'm drawing a blank. Or
[4:59:55]
I dreamt of it. Thank you. Dreaming again? Any questions,
[5:00:00]
councilor? Lovegrove. Questions? Yes. Two questions, your worship. Thanks. So
[5:00:07]
just to go back to the south Pandozi. Park aid
[5:00:10]
and finish up. Part of that will be whatever location,
[5:00:14]
whatever they're looking at a business case to confirm feasibility,
[5:00:17]
and then it would help you establish priorities, so I.
[5:00:21]
Get that 400,000. Okay, fair. Enough. Then the real question
[5:00:26]
was, you talk about expenses when you have your goal
[5:00:29]
of 2.0. That's operating, right. That doesn't include land and
[5:00:32]
construction. The two to one ratio. That's just revenue versus
[5:00:38]
operating. That's correct, Georgia. Okay. Thank you. Councilor Wolverich, please.
[5:00:44]
Thanks for worship. Just to carry on with the south,
[5:00:47]
Pandozi. Parcade questioning. I understand the methodology behind it, Mr.
[5:00:53]
Edstrom, around the planning. But where I get confused is
[5:00:58]
we're going to come back to council, but. We're already
[5:01:01]
subsequently approving the 27, 28 and 29 projections of the
[5:01:06]
construction. Those wouldn't come back to us, would they? So,
[5:01:09]
basically, by approving this, we're locking in those capital commitments
[5:01:12]
into the subsequent years. Is that not true, Mr. Sass?
[5:01:17]
Please thank your worship. No, you're not locking in. Those.
[5:01:21]
Costs, but it does help the finance team in our
[5:01:24]
long term financial strategy to be able to anticipate that
[5:01:27]
the parking team will be coming back with a plan.
[5:01:31]
For a parcade. And then once that's authorized that the
[5:01:35]
funding will be allowed to be expended. But what this
[5:01:39]
is. Allowing the finance team to have a fighting chance
[5:01:42]
at that long term financing strategy. But the funds would
[5:01:45]
not be authorized to be expended until council endorsed. The
[5:01:50]
construction of the parcade. Okay. I guess there's just a
[5:01:56]
lot of things at play that I'm pondering. About this?
[5:01:59]
Because we're talking about a citywide parking strategy that we've
[5:02:02]
had. Workshops on. We're talking about. A dynamic pricing strategy.
[5:02:08]
And so then I guess I'm just uncomfortable seeing. Those
[5:02:12]
numbers committed to in Fels Pandozi before we know that
[5:02:15]
it's going to be in that location. Councilor. Just a
[5:02:19]
point of clarification from the city manager, because. The capital
[5:02:22]
always sits within a ten year capital plan already. But.
[5:02:24]
City manager, please. Thank you, worship. Maybe just to give
[5:02:26]
council. Of additional comfort. Having this in tenure in the
[5:02:31]
approved tenure capital plan. Puts it to a place where
[5:02:35]
you're going to be reviewing on an annual basis, regardless.
[5:02:38]
So on. The ten year capital plan comes back for
[5:02:40]
review again next year. You'll have another opportunity to take
[5:02:44]
a look at that with the progressive information that Mr.
[5:02:47]
Edstrom team has come up with in terms of design.
[5:02:49]
So before you endorse next year's tenure, cop or re
[5:02:52]
endorse next year's tenure capital plan. You'll have that opportunity
[5:02:55]
again. But you'll have more information at that time. Boat
[5:02:59]
location, design, fit and those types of things. Okay. Thank
[5:03:06]
you. Comments councilor Dehurt, just before we move on. Thank
[5:03:12]
you. Yeah, I know that this isn't. What I'm going
[5:03:15]
to say is not in one of the items of
[5:03:17]
b one or b two? But I really again wanted.
[5:03:23]
To just thank staff and council and the city manager
[5:03:27]
for the free parking for the veterans, the reason I'm
[5:03:30]
bringing it up today is I have had many veterans
[5:03:33]
in the last couple. Of weeks, actually, since November 11.
[5:03:36]
Come to me. The first thing they said. It's really,
[5:03:39]
really easy to register here at the city because I
[5:03:42]
wasn't sure. And sometimes things happen. And secondly, they said
[5:03:47]
that how pleasant it was that everyone they've gone to
[5:03:50]
and that it was a quick form and how pleasant
[5:03:52]
everyone was at the city and I've had many of
[5:03:55]
those, so I just wanted to bring it up in
[5:03:57]
the public. Realm, because I think. It's really important that
[5:04:00]
we did it. We followed through, and now they're all
[5:04:03]
really happy on the system, so thank you. Thank you.
[5:04:07]
No further comment. Just before we move on, just a
[5:04:09]
point of clarification for council with regards to the concern
[5:04:12]
around the parking elements on it, there is a substantial
[5:04:15]
need within this community. That it ends up being we
[5:04:17]
deliver this, and this has come about as part of
[5:04:20]
this report. And part of this moving forward. What Mr.
[5:04:23]
Edstrom is saying, and what he's saying is that they're
[5:04:25]
looking at that. Now, we don't know exactly where. It'll
[5:04:29]
land where it will land in the future, but it's
[5:04:32]
going to come. Back before council, before it lands anywhere.
[5:04:35]
So we're advancing the idea that we recognize that this
[5:04:38]
has to be done within the community, and it all
[5:04:40]
started out as councilor stocks said 18 years ago. In
[5:04:44]
the south, Pandozi. Or whatever the number of years you
[5:04:47]
use in the south Pandozi. But it may be somewhere
[5:04:49]
else within the community, but it will come back to
[5:04:51]
this council before we advance it, so. It's just so
[5:04:53]
that it ends up being everyone is aware. Saying anything
[5:04:57]
specific. Where I'm uncomfortable. I'm totally comfortable with the 400,000
[5:05:02]
in planning to understand where it's going to be. In
[5:05:06]
the community, but where I continually have challenges. Is the
[5:05:09]
forecasting of the capital build in the subsequent years, and
[5:05:12]
I know the city manager. Says it'll come back at
[5:05:14]
a capital plan, but we never remove anything from the
[5:05:16]
capital. Plan. It just gets endorsed as a whole document.
[5:05:20]
But the forecasting of the build may happen. On this
[5:05:23]
site or it may happen on some other site that
[5:05:26]
is part of the process of them going back through.
[5:05:29]
So it allows finance to recognize that it will be
[5:05:33]
something that. And Mr. Sass jump in. Here at any
[5:05:35]
particular point in time, but it allows finance to recognize
[5:05:38]
that it will be something that happens within our community.
[5:05:41]
For them to kind of. Structure, budget forwards moving forward.
[5:05:45]
It's a study and it's a capital allocation for something
[5:05:48]
to happen, and that will be a process that comes
[5:05:50]
back before council. Mr. Sass, am I off mark on
[5:05:52]
that? Sorry. My buttons are having some delays. Thank you,
[5:05:56]
your worship. I think. The hardest thing for us to
[5:06:03]
handle in finance. In how we're funding capital is to
[5:06:08]
have substantive capital projects land in the near term. In
[5:06:12]
the plan that were unanticipated a few years out. And
[5:06:17]
so. Not opining or presenting any comment on where the
[5:06:23]
parquet may go or how that works. But it is
[5:06:26]
very difficult. In our financial plan to have, say, a
[5:06:29]
large parcade dropped in next year that was not contemplated
[5:06:32]
a few years out. Thank you, Melanie, please. I'd move
[5:06:38]
ahead. Yes. Okay. Thank you. The next service area that
[5:06:42]
we will visit is the partnerships office. This starts on
[5:06:46]
page 303. Of your budget volume. It's a pleasure to
[5:06:52]
present. The partnerships office. The team that. Is here with
[5:06:59]
me today. Really? Bodies. The vision that we challenged, the
[5:07:04]
way the organization thinks about designs, pays for and delivers
[5:07:08]
infrastructure. To make Kelowna a city of the future. It
[5:07:14]
is a multidisciplinary team that really advances that notion of
[5:07:19]
challenge. Our key accomplishments in 2025. One of the key
[5:07:26]
areas was to establish foundational policies, program systems to support
[5:07:29]
the evolution and immaturity of the partnership's office. These policies
[5:07:34]
and programs have helped to guide. And optimize the work
[5:07:37]
we are doing, as well as enhance the city's reputation.
[5:07:40]
Through recognition. With our partners. It's included a strategic plan.
[5:07:47]
Our major partnership development policy, and we've activated. Our alternative
[5:07:51]
revenue program. That council has saw previously. We've also created
[5:07:57]
two major partnerships. As we continue to focus on the
[5:08:00]
more significant. Partnerships for our community. We've partnered with tennis
[5:08:05]
clubs in Canada to provide year round play. With five
[5:08:09]
new courts and a winter tennis facility admission, recreation park
[5:08:14]
and we've partnered with Okinawkan College on a new recreation
[5:08:17]
and wellness facility at their Klona campus. Providing funding to
[5:08:21]
build a larger facility that would not otherwise be constructed
[5:08:25]
at OC in the intergovernmental relations portfolio. The team led
[5:08:30]
many key opportunities. In high profile meetings, including two meetings
[5:08:35]
with Premier deep. To advance council priorities around economic development
[5:08:40]
at YLW, addressing repeat property offenders and to see a
[5:08:46]
regional mandatory care facility in the Okinawan. The team also
[5:08:51]
facilitated advocacy tours to Victoria and Ottawa, and we're starting
[5:08:55]
to see. Greater success by going. And working alongside the
[5:09:00]
federal government. The team also managed Cola's delegation and participation
[5:09:05]
at the UBCM convention and notably we received two awards
[5:09:10]
the team was pretty proud of. From climate energy awards
[5:09:15]
for the Climate Resilience Colon Strategy and the Dhart park
[5:09:18]
carbon neutral design. We also developed and launched a corporate
[5:09:23]
awards program. To undertake a systematic approach to how we
[5:09:28]
apply for awards and the hoping that we continue to
[5:09:32]
have corner recognized as a national leader. On the grants
[5:09:37]
portfolio. The team was successful in managing $119,000,000 in grants.
[5:09:42]
And part of it, as we hear, is not just
[5:09:45]
being awarded the grant, but how you manage. It successfully
[5:09:48]
over time to make sure your reputation stays strong. We
[5:09:51]
were able to celebrate the success of the grants program
[5:09:54]
by the opening of the new waterfront stage. Which was
[5:09:57]
attended by the provincial minister of Tourism, Arts, Culture and
[5:10:00]
Sport. We celebrated the opening of the second phase of
[5:10:03]
drath Kona beach with Kiwanis and KGH foundation and we
[5:10:08]
celebrated the opening of the Bertram overpass. As we focus
[5:10:12]
on improvements for the partnership's office service level. A couple
[5:10:18]
areas to note. We continue to work very well alongside.
[5:10:24]
UBCo with our city and UBco Research alliance and continue
[5:10:27]
to leverage the collaboration. Research, but also, very interestingly, the
[5:10:32]
level of grant opportunities when we work together with Ubco.
[5:10:35]
The city is committed to continue to partner on this
[5:10:38]
research. And that brings together both our municipal staff and
[5:10:41]
university researchers to explore local challenges through applied research. We
[5:10:47]
continue to refine our evidence based background materials. For council
[5:10:54]
as we continue to advocate both the provincial and federal
[5:10:57]
government. On council's key advocacy priorities around economic development at
[5:11:03]
YLW, increasing local crown prosecutors a regional compassionate mandatory care
[5:11:07]
facility, new transit operations center, and the Clement Avenue extension.
[5:11:12]
And then what's? Under development currently is the team is
[5:11:15]
working on a new major partnership strategy to pursue the.
[5:11:19]
Highest impact partnerships. I think you've heard from the team
[5:11:22]
before that they're really focused on national level partners. And
[5:11:28]
making sure that it aligns well with our ten year
[5:11:30]
capital plan. As for performance metrics, we have three performance
[5:11:35]
metrics to bring to council. The first is our partnerships
[5:11:39]
leverage ratio. I spoke about that earlier. And the importance
[5:11:44]
of having. The opportunities fund. Our commitment when we look
[5:11:47]
at partnerships is at minimum we have a ratio of
[5:11:50]
two to one. In 2025, the full fund was successfully
[5:11:54]
allocated. Meaning all funds were spent. And the leverage ratio
[5:12:00]
was estimated at four to one, with a significant portion
[5:12:03]
directed to the two major projects that identified earlier, which
[5:12:06]
was the winter tennis facility and the OC recreation facility.
[5:12:12]
Performance metric number two considers the success rate on grant
[5:12:15]
applications. Per year, as you can see. We are targeting
[5:12:23]
close to 80% in 2025, but historically have always been
[5:12:27]
about 70%. This one is interesting because. We have had
[5:12:32]
this performance metric for a long time, and we always
[5:12:34]
started at a baseline of about 50% and we've exceeded
[5:12:38]
it. It's something that we're going to look at going
[5:12:40]
forward. But part of our thought process around it was
[5:12:43]
not. To put a performance metric so high that you're
[5:12:46]
only taking safe applications if that makes sense that. We
[5:12:52]
know that we can continue to get better, but also
[5:12:55]
making sure that we're going after some of the bigger
[5:12:57]
applications or ones that might be more opportunistic. And so
[5:13:00]
we're not being driven to just go after the money
[5:13:03]
that we know is safe, but. We're going after, we
[5:13:05]
believe to be the bigger. Harder grounds to try to
[5:13:09]
apply for, but it's one that we're going to continue
[5:13:10]
to look at. And then lastly, performance metric number three
[5:13:15]
successfully completed efficacy priorities through. Minister meetings. It's a combination
[5:13:20]
of the number of meetings that we have with ministers,
[5:13:23]
our target is that we complete one advocacy priority per
[5:13:26]
year. When we talk about advocacy priorities with council of
[5:13:30]
having. Kind of between three to five. Accuracy, priorities. We
[5:13:35]
know that some of them are going long term, and
[5:13:36]
some of them may. Span over councils to see them
[5:13:39]
come to fruition. The one that we're proud to say
[5:13:41]
that we completed in 2025 is the completion of the
[5:13:44]
180 heart and hearth homes. Milni. The partnership's office has
[5:13:52]
an expenditure budget of $1.8 million and is operated under
[5:13:56]
two cost centers. Funding for the partnership office is predominantly
[5:14:02]
from property taxes, with a small amount coming from reserves
[5:14:06]
and fees and charges. The 2025 revised budget was $2,149,000
[5:14:16]
after previously approved budget amendments have been added. The 2026
[5:14:21]
year is starting at 1,733,000. To maintain current service levels,
[5:14:27]
an additional $113,000 is requested. And to enhance service levels
[5:14:32]
an additional 2000. There are no operating or capital requests
[5:14:39]
for this service area. Does anyone on council have any
[5:14:42]
questions? For Mr. Edstrom. Councilor Hodge, questions or comments? Questions
[5:14:50]
minor. In your. Boxes. You've got 2025 estimates.
[5:15:01]
Like the union numbers. And make. Their. Number four. 2025
[5:15:09]
that says estimate. It's the end of the year, so.
[5:15:14]
Can you not say it's complete? And that's a gap.
[5:15:19]
Right. Do you follow what I'm saying? I do, your
[5:15:27]
worship. So the first thing is when this is submitted,
[5:15:30]
it's submitted prior. To the end of the year so
[5:15:32]
be submitted likely back in September. At that time, we
[5:15:36]
knew that. The funds have been fully allocated to those
[5:15:41]
two projects, and we were able to have an average
[5:15:44]
funding ratio of four to one. So we were able
[5:15:46]
to identify it, but it was just identifying. It towards
[5:15:48]
the end of the year because at that time it
[5:15:50]
was submitted in September approximately with global focus, but it's
[5:15:53]
still too early for us. You're quite sure? And if
[5:15:56]
you notice all three performance? Metrics say estimate as well.
[5:16:01]
Exactly. That's why I was 21. Okay. I just want.
[5:16:03]
To make comment, Mr. Merlit. Since council approved this. Coming
[5:16:09]
forward, this old projecting group. Tremendous, tremendous success we've had
[5:16:14]
from their involvement, and I think that. It's really. Partnership
[5:16:23]
office concept has been a huge upswing for us. I
[5:16:26]
think it's tremendous value. To the city. And proof is
[5:16:31]
in the pudding and what we call over the years.
[5:16:34]
So I just want to. Thank. Thank you. I think
[5:16:37]
it's great. What you're done. Councilor Wolverich, please. Okay. Comment?
[5:16:42]
I think we're on comments. We have no. More questions,
[5:16:44]
so please proceed. Thanks for worship, and thanks, Mr. Edstrom,
[5:16:47]
for the presentation today. And though there's no budget request,
[5:16:49]
I just want to express my gratitude for all the
[5:16:53]
support. That the group gives council and the rest of
[5:16:55]
the city throughout the year. Definitely couldn't be doing the
[5:16:59]
advocacy that we do and garner the level of attention
[5:17:02]
both from provincial and federal partners. And our investment pays
[5:17:07]
tenfold, so it's a best in class, in my view.
[5:17:11]
And our relationship and trust. Driven division that continually works
[5:17:15]
to support the community. So thank you for all the
[5:17:17]
work you and the team do? Councilor Dehart, please, just
[5:17:22]
quickly. I wanted to dittle. What? Councilor Wolverich. Said it
[5:17:26]
is just a real pleasure to work with that department.
[5:17:29]
And whether it were in counselor or whether we're on
[5:17:32]
a field trip or whether we're somewhere else, it is.
[5:17:35]
Really nice to know that. Absolutely. Everything is perfect. And
[5:17:43]
the governance that you do and actually the leadership with
[5:17:45]
the different levels of government is incredible. Really. It's something
[5:17:49]
that we can't do alone. I guess that's what. I
[5:17:51]
want to say that we need your help to do
[5:17:54]
what we do. So thank you all. Very much. Councilor
[5:17:58]
Singh, please. Thank you, worship. I want to add to
[5:18:01]
what my colleagues just said. We saw them at work,
[5:18:05]
at the UBCM. At UBC. And we saw them hit.
[5:18:07]
The ground running. And just. They were all over, trying
[5:18:11]
to. Trying to make sure they were connecting with the
[5:18:13]
right. People to get the best for Kelowna. So thank
[5:18:16]
you very much for all the work. You and your
[5:18:18]
team do, Councilor Lovegrove. Okay, well, this is a new
[5:18:22]
one. I actually. Just want to go like this. Well
[5:18:26]
done, because I think you win the applause award. We
[5:18:28]
have applauded your team more. Often than any other. Perhaps
[5:18:31]
the events are a close second, but just well done,
[5:18:35]
especially herding. A cat like me because I know it's
[5:18:38]
difficult. Thank you, worship. Thank you. Any other. Comments. Derek,
[5:18:43]
if I may, just before you leave. To Michelle, excel,
[5:18:48]
Valentina, Christine, and obviously Kirby, too. Everything that was set
[5:18:53]
up here is correct. You do assist myself, you do
[5:18:57]
assist counsel, and you do assist the city with regards
[5:19:01]
to the work that you do. And the ability of
[5:19:04]
advancing initiatives for the betterment of the community. So on
[5:19:09]
behalf of all of us, I know it's been said,
[5:19:11]
but we truly thank the team for the work that
[5:19:14]
they do. Very much appreciate it. Thank you. Council. We
[5:19:18]
are going to take a five minute break. We just
[5:19:20]
have a couple of items done. I mean, back after
[5:19:22]
that. We're going to take just a 510 minutes break.
[5:30:56]
You're on right now. I guess we should.
[5:32:00]
Thank you. I'm just going to call. This meeting back
[5:32:04]
to order. Deputy city clErk. Please thank your worship. We
[5:32:08]
are now in service area 21, governance and leadership. Thank
[5:32:12]
you, your worship. This is on page 311 of your
[5:32:17]
budget volume. Thank you, your worship. The goal of this
[5:32:22]
service area is to ensure an accountable and transparent government.
[5:32:25]
Through strong counsel and administrative governance. We prioritize transparent and
[5:32:30]
responsive information sharing with council and the public through council
[5:32:34]
reports, regular city manager updates and memos, consultation and advice.
[5:32:40]
And responses to inquiries. Our operational services include council and
[5:32:44]
committee meeting management bylaw and policy development, information management, responses
[5:32:50]
to council correspondence, access to information and protection of privacy.
[5:32:55]
And these are all done with a view to advancing
[5:32:57]
council and corporate priorities. While meeting legislative compliance. In terms
[5:33:03]
of key accomplishments, this year included a review of an
[5:33:07]
update to council's priorities focusing on key initiatives and programs
[5:33:11]
to achieve council's goals across the priority areas and the
[5:33:14]
2026 preliminary budget reflects these priorities. We also developed a
[5:33:19]
new council policy framework for the regular review and development
[5:33:23]
of council policies through this effort, council rescinded over 30
[5:33:27]
obsolete policies, helping to provide clear and consistent direction to
[5:33:30]
the public and staff. Highlighting some continuous improvements. We continue
[5:33:35]
to advocate on council priorities with federal and provincial governments
[5:33:39]
and engage with the province on initiatives that affect the
[5:33:42]
city and local governments more broadly. And operationally, we advise
[5:33:47]
on bylaw and policy development to add value to the
[5:33:49]
work of other service areas and support digital transformation initiatives
[5:33:53]
with guidance on records and privacy considerations. We've also started
[5:33:58]
enhancements to our service delivery by using digital solutions to
[5:34:01]
automate certain tasks. Looking at our performance measures. Measures. I'll
[5:34:07]
start with our policy function. As mentioned, there were quite
[5:34:10]
a few council policies that were rescinded, with over 40
[5:34:14]
policies reviewed, created or rescinded this year, which is well
[5:34:17]
above our target of 15. We do expect this to
[5:34:20]
return. To more normal levels in 2026. Through the regular
[5:34:25]
review and development of policies. For council correspondence. We've maintained
[5:34:30]
responsiveness with respect to responding to correspondence, with responses coming
[5:34:36]
from the mayor on behalf of council or from staff
[5:34:38]
on operational matters. Council received well over 2500. Pieces of
[5:34:42]
correspondence a year, and we're advancing opportunities to improve this
[5:34:46]
function through technology solutions. For FOI. Our compliance with legislative
[5:34:51]
timelines for access to information requests is slightly above our
[5:34:54]
target and higher than comparative municipalities providing responsive service to
[5:34:59]
the public. And with that, the financial planning manager will
[5:35:02]
provide the budget overview. Thank you. Thank you, Laura. So,
[5:35:09]
for the governance and leadership service area, the expenditure budget
[5:35:12]
for 2026 is. $5.4 million. This area is operated under
[5:35:18]
five cost centers. The funding strategy for 2026 for this
[5:35:24]
service area is predominantly property taxes with a small amount
[5:35:28]
coming from reserves and other revenues. The 2025 revised budget
[5:35:37]
was 4,786,000. After the annualization of previously approved budget requests.
[5:35:44]
We will start 2026 at 4,498,000. To maintain current service
[5:35:52]
levels, an additional $779,000 is requested. And to enhance service
[5:35:57]
levels. An additional $156,000 is requested. The service area has
[5:36:06]
two operating requests, and they're found on page 317. The
[5:36:11]
first request is for the 2026. Local government election request
[5:36:16]
is in 2026 for 374,400. Funded from reserve and then
[5:36:22]
ongoing. Is a top up of 40,700 each year to
[5:36:29]
be used towards next year's. Election funded from taxation. The
[5:36:35]
second request is the council initiatives request. So this is
[5:36:39]
the council funding that can be used. For any council
[5:36:43]
initiatives throughout 2026 or can be used today. This is
[5:36:47]
$150,000. Taxation ongoing. There are no capital requests or priority
[5:36:54]
two requests for the service area. Is there any request
[5:36:58]
that council would like to discuss. Councilor Cannon, please. Questions.
[5:37:03]
Thank you. Two questions. One. Laura. On performance measure three.
[5:37:07]
Approximately how many FOI requests you receive a year? Your
[5:37:11]
worship does vary year to year on average. We're looking
[5:37:16]
at usually between 110 to 120, with varying complexity and
[5:37:21]
therefore timelines to respond. Okay, thanks. And on. With regard
[5:37:24]
to operating request on 317, the council initiated how much
[5:37:29]
was spent in 2025. If you could give me a
[5:37:33]
few minutes. You're worshipping? I'm happy to. Get back to
[5:37:35]
you on that. Thank you. We will come back. Councilor
[5:37:38]
Dehart, please. Well. Thanks. I know. Maybe it's late in
[5:37:44]
the day, or maybe. I want you to refresh my
[5:37:47]
memory on something. So under the council initiatives, I remember,
[5:37:51]
like. Grant funding to support business associations, electric mobility, the
[5:37:56]
Incentives program, and public safety tax force. But for the
[5:38:00]
life of me, I can't remember or I can't figure
[5:38:03]
out our enhancement. Of snow and ice clearing, so. I
[5:38:07]
thought that would just have gone under our yards budget.
[5:38:11]
I don't get that one and I can't remember it,
[5:38:14]
so why would that. Be in there. Because if we
[5:38:18]
needed an enhancement of snow and ice clearing, That would
[5:38:21]
go in a different budget, wouldn't I? Like council initiatives.
[5:38:26]
Thank you, worship. So those are examples of items that
[5:38:29]
council has previously funded through. This budget. With the ability
[5:38:35]
to respond to emerging items as they've come forward. That
[5:38:39]
council has identified and so that's the intent behind that
[5:38:42]
budget, is to be able to respond to things. Like.
[5:38:46]
Increased funding to business improvement areas. For example, So those
[5:38:49]
are examples from the last couple of years. With the
[5:38:52]
idea that council would then decide as other opportunities come
[5:38:57]
forward on funding from this. And then in future years,
[5:39:01]
if those are ongoing, then those would be captured within
[5:39:03]
the appropriate service. Area. Okay, I understand that, but I
[5:39:07]
don't understand why snow and ice clearing wouldn't. Why that
[5:39:11]
would come as a council initiative and why it just
[5:39:14]
wouldn't be dealt. With staff. And I guess I just
[5:39:17]
don't get that council to hurt Mr. Sass. Please. There's
[5:39:20]
something I'm missing. I'm sorry. Thank you, worship. If you
[5:39:25]
can recall, over the last few years, it's how we've
[5:39:27]
given council. Some latitude outside of. What we have recommended
[5:39:31]
to staff within the approved taxation budget. And so, as
[5:39:34]
an example, we would have brought forward. A service level
[5:39:38]
recommendation and a taxation level to support it. And then
[5:39:43]
council would have said, we would like to allocate more
[5:39:46]
funds from that, but. Not to increase taxation. So you
[5:39:49]
would have allocated a piece of those funds now. They
[5:39:53]
will form operationally part of the snow and ice budget,
[5:39:56]
but for transparency and showing counsel what you have approved
[5:39:59]
historically, based on those priorities, we bring it back and
[5:40:02]
show you, okay, that's. Good. I get that. And councilor,
[5:40:04]
I think that was your initiative. It was your initiative
[5:40:07]
to bring it forward. Mayor, I think you're completely wrong.
[5:40:17]
No, I got approval on the other side of the
[5:40:18]
table there. Other questions. Other questions. There was that one
[5:40:25]
clarification. Melanie, please. Thank you. So in 2025, the council
[5:40:30]
initiative budget was $900,000. It was allocated as $478,000 towards
[5:40:37]
mayor task force initiatives. $50,000 for bylaw services enforcement coordinator.
[5:40:45]
$75,000 was input towards council. Advocacy. 151,000 for two bylaw
[5:40:52]
officers and $150,000 for economic development. Thanks. So when we
[5:40:58]
help, for example, we gave funding to help the Okanagan
[5:41:02]
son go. To the nationals that come under there as
[5:41:05]
well. Thank you, your worship, but that comes out of
[5:41:09]
the council contingency funding, so every year. In budget, I
[5:41:14]
believe we have $35,000 for. Council contingency that is available
[5:41:19]
for use throughout the year. As council. Thanks. And we
[5:41:23]
still have 185,000 for one time projects under the strategic
[5:41:27]
council. Strategic initiatives that is being held in reserve right
[5:41:31]
now. Thank you. Thank you. Seeing. No further questions. Laura,
[5:41:36]
thank you very much. So we'll now move. To the
[5:41:44]
enabling services. And we will welcome the general Manager of
[5:41:46]
corporate services, Mr. Joe sass. Thank you. Thank you, Mel.
[5:41:52]
And thank you, your worship. Just before I get going.
[5:42:00]
Wanted to provide a little bit of an observation of
[5:42:02]
today and when I was speaking to the organization and
[5:42:04]
council about transitioning to service based budgeting and KPIs a
[5:42:07]
few years ago one of the things that I recall
[5:42:10]
saying to everyone is that when we get mature with
[5:42:12]
this, when we have a budget conversation, it's going to
[5:42:14]
be just as much about performance and what we get
[5:42:17]
as it is about our investments and in observing. The
[5:42:21]
conversation today. I can say it's been a lot of
[5:42:24]
conversation around the performance measures and how we're actually doing.
[5:42:27]
So just wanted to commend everybody who's been part of
[5:42:30]
that because this is exactly what we were trying to
[5:42:32]
create when we took that step a few years ago.
[5:42:36]
So I will be presenting the budget for our enabling
[5:42:38]
services areas which are not always visible, but are crucial
[5:42:42]
to delivering our services to our community. These services ranging
[5:42:46]
from building services, financial services, human resources, communications fleet and
[5:42:52]
information technology provide the foundation that supports the work of
[5:42:56]
all. Of our operating departments. Each of these areas plays
[5:42:59]
a critical role in enabling us to meet our strategic
[5:43:02]
goals, legislative services. Ensures compliance and governance, while risk management
[5:43:08]
helps safeguard our operations and our assets. Real estate and
[5:43:12]
internal construction delivery help us manage and develop our assets
[5:43:15]
efficiently, while strategy and performance and senior leadership guide us
[5:43:19]
towards achieving our long term objectives, ensuring we remain accountable
[5:43:23]
to our taxpayers. Together, these services ensure that our frontline
[5:43:28]
teams can focus on delivering direct value to our citizens.
[5:43:32]
As always. There's a lot that the enabling services do,
[5:43:35]
but I'll just provide. You a few highlights in line
[5:43:37]
with council priorities. So partnering with BC Housing as part
[5:43:41]
of the BC builds initiative to deliver approximately 150 units
[5:43:44]
on city owned property, partnering with nonprofit to deliver 195
[5:43:49]
new rental units, including approximately 80 below market. Implementation of
[5:43:54]
our community safety dashboard to enhance transparency to the community
[5:43:58]
and show how we're making the city a safer place
[5:44:01]
to live. Groundbreaking for the Parkinson Recreation center. So obviously
[5:44:06]
a long time coming. The largest project we've ever done
[5:44:11]
as a city, as part of the building stronger colona.
[5:44:14]
Program as well as breaking ground on the North Glenmore
[5:44:17]
Protective Services campus. So another piece of infrastructure that's been
[5:44:21]
long awaited by the community. We've also commenced and completed
[5:44:25]
a record number. And value of capital projects. As we've
[5:44:30]
discussed many times throughout this council term, particularly in the
[5:44:33]
last year. We continue to enhance our KPIs and focus
[5:44:39]
on targets and benchmarking again to round. Out that conversation
[5:44:42]
and to continue to provide better performance data to provide
[5:44:45]
context for our budget. And we've designed a new smart
[5:44:50]
search to help customers select correct service request types, reducing
[5:44:55]
frustration and submission times as we pivot our focus towards
[5:44:58]
customer experience as an organization. Talking about a couple of
[5:45:03]
our performance measures in the enabling services area. Enabling services
[5:45:07]
as a percentage of total budget. I mentioned that key
[5:45:10]
performance indicator on Monday. If you look over the long
[5:45:13]
term there's a trend down, which is what we like
[5:45:15]
to see, and that tells us that we're investing more
[5:45:18]
in the frontline service deliverers than we are. In the
[5:45:22]
overheads of the organization, which is a story we like
[5:45:24]
to tell and making significant progress on our deferred building
[5:45:29]
capital renewal. Deferred capital renewal refers to the postponed investments
[5:45:33]
required for maintaining and renewing facility assets if not addressed
[5:45:37]
in a proactive manner. This tends to cost us more
[5:45:40]
money over time. Infrastructure investment, of course. A major. Measure
[5:45:49]
given the mandate of current council and one that. We're
[5:45:54]
really proud of our planning and delivery teams continuing to
[5:45:56]
show strong performance. Safe workplace insurance discount measures and highlights
[5:46:01]
our safety performance record at the city and also tracks
[5:46:05]
the benefit we receive. In our overall workplace insurance premiums.
[5:46:09]
We currently spend over $3 million on these premiums. And
[5:46:12]
this measure shows our returning of over 300,000. Obviously, communication
[5:46:17]
with our citizens is critically important. So looking at measuring
[5:46:21]
our communication channels and touch points, with our citizens is
[5:46:24]
important. To measure this. Measure highlights the substantial growth in
[5:46:32]
engagement points with our citizens over time. Process automation as
[5:46:36]
we look to enhance efficiency. And again, we've had an
[5:46:40]
MPI conversation. Thinking about coming in below that. So, looking
[5:46:43]
to use innovative technology to be able to offer high
[5:46:46]
quality services in a more efficient way. And finally, the
[5:46:50]
last one I will show you is a snapshot of
[5:46:53]
our financial health indicators. We've discussed these multiple times, but
[5:46:57]
just keep in mind that this is something that guides
[5:47:00]
every investment decision we make at the city of Kelowna.
[5:47:02]
With that said, I will pass. It back to Melanie.
[5:47:06]
Thank you, Joe. The enabling service areas combined make up
[5:47:11]
$156.7 million of the city's. Expenditure budget enabling. Services includes
[5:47:19]
several different cost centers, as you can see on the
[5:47:23]
screen, with the largest one being financial services, which includes.
[5:47:28]
Debt and other. The funding strategy for the enabling services,
[5:47:35]
the majority of it, that enabling allocation that you can
[5:47:39]
see. On the screen of $52.6 million. That is the
[5:47:42]
amount that has been allocated out over all the service
[5:47:45]
areas as services to the community. Could not be delivered
[5:47:50]
without the enabling services there to support them. The remainder
[5:47:53]
of the area is funded from reserve funding, other revenues,
[5:47:57]
fees and charges and grants. The 2025 revised budget was
[5:48:03]
$141,337,000. After the annualization of previously approved budget
[5:48:12]
requests, the areas will start 2026 with an operating budget
[5:48:16]
of 99,667,000. The service areas combined to maintain their current
[5:48:24]
service levels are requesting $51,218,000. And to enhance service levels
[5:48:33]
and additional 5,839,000. The enabling services has a number of
[5:48:40]
priority one operating requests. We'll do them in order. So
[5:48:47]
the first area for facilities has facility support, service enhancements.
[5:48:52]
Starting at $63,000, increasing to $123,000 ongoing. Facted from taxation.
[5:49:01]
Next is facility maintenance at $810,000, ongoing, funded from taxation.
[5:49:09]
Next is human resources, organizational development. At $200,000 ongoing, funded
[5:49:15]
from taxation. And the pre employment testing software implementation at
[5:49:20]
$23,000 funded from reserve under it, we'll start with cybersecurity
[5:49:28]
or, sorry, cyberstrategy. At $150,000 ongoing first year funded from
[5:49:33]
reserve and then taxation afterwards. The data center as a
[5:49:39]
service at $150,000 each year, ongoing, funded from taxation. It
[5:49:47]
resourcing redevelopment at $200,000 in 2026, increasing to $400,000 ongoing
[5:49:55]
funded from taxation. IT software and services maintenance starting at
[5:50:01]
674,000 in 2026, increasing to 682,000 in 2027 and 690,000
[5:50:09]
in 2028. Ongoing, all funded from taxation. In real estate.
[5:50:18]
The strategic land development projects at $150,000 ongoing first year
[5:50:23]
funded from reserve and then ongoing at taxation. In risk
[5:50:28]
management. The insurance premiums being requested is an additional $400,000
[5:50:34]
ongoing, funded from taxation. The risk management recovery program at
[5:50:40]
$104,000. Ongoing, funded from revenues received through the program. The
[5:50:48]
security contract increase of 71,000 in 2026, increasing to 75,000
[5:50:54]
in 2027. Then 79,000 ongoing funded from taxation. And then
[5:51:02]
there is operating and maintenance impacts from the capital request
[5:51:06]
from the ten year capital plan. The capital request included
[5:51:14]
in these area are all in alignment with the council
[5:51:17]
endorsed and funded ten year capital plan. Is there any
[5:51:22]
request that council would like to discuss further? Councilor Cannon,
[5:51:27]
please. Thank you. Page 341. What's the base budget for
[5:51:32]
the security contract? And wondering what facilities were providing the
[5:51:40]
services for. One moment, please.
[5:51:58]
$1.4 million. Those are for security guards for. Different
[5:52:08]
city buildings. Thank you. It just looks like the inflationary
[5:52:12]
costs associated with. The security guard program, and it looks
[5:52:19]
like it's going up faster. Thank you. Page 345. For
[5:52:28]
park washrooms. Growth and renewal. What's the base budget on
[5:52:31]
that? Well, there is not just. A specific. Because it
[5:52:39]
seems like both. It's a maintenance. And a renovation, so
[5:52:43]
I don't know if it's combined operation and capital. Because.
[5:52:51]
It talks about maintaining levels of service for park washrooms,
[5:52:53]
but it also talks about renovating existing washings. You're worshipping
[5:52:58]
the ten year capital plan, the washroom program. Has year
[5:53:03]
by year difference. So one year, I believe, will be
[5:53:06]
design and renewal of small renewals. Followed by construction of
[5:53:12]
future washrooms. So this is a capital program. In just
[5:53:17]
the 2026 portion of it. That helps explain. Thanks. The
[5:53:20]
next one down for the sports stadium. Is there a
[5:53:22]
field identified for that yet, or is it still. Not
[5:53:26]
sure. Your worship. This will impact several different fields across
[5:53:32]
the city. And I believe they have a program that
[5:53:37]
they've built where we will do certain fields. Each year.
[5:53:41]
I don't know the fields that are planned for the
[5:53:43]
first year. Okay? And. The next page. The fleet management
[5:53:46]
system. Just wondering, is that half a million dollars for
[5:53:49]
a software program. Thank you, your worship. It would be
[5:53:52]
the software program plus the associated peripherals and implementation, so.
[5:53:56]
There's some work that has to go in around implementing
[5:53:58]
the software. You have to save a lot of fuel
[5:54:01]
if it's going to be for half a million just
[5:54:02]
for a software. So. Thanks. Appreciate it. Councilor Lovegrove, please.
[5:54:09]
Thank you, worship. So. I'm seeing that. There was no
[5:54:15]
general taxation in the funding strategy, so I'm guessing came
[5:54:19]
out of enabling. Allocation where. You've got each of these
[5:54:23]
individual items from taxation. Am I correct on that interpretation?
[5:54:28]
Thank you, your worship. There is taxation, funding, but it
[5:54:33]
has been allocated to all the different service areas. When
[5:54:36]
you were looking at each one, there will be a
[5:54:38]
line for enabling allocation. Okay, thank you. That's what I
[5:54:40]
thought, okay? So going down the list, then? The. Data
[5:54:48]
center. Is that our data catalog that's online right now
[5:54:52]
on our website. That's going to. A different infrastructure set.
[5:55:00]
Thank you, your worship. That's actually the core data center
[5:55:04]
infrastructure that's actually on premise and looking to move that
[5:55:07]
off premise to a cloud solution. Okay. And will that
[5:55:10]
include fees then, for use? I don't even know if
[5:55:13]
it's costed. Out now. It changes the dynamic of how
[5:55:18]
the funds are captured. So it's often referred just to
[5:55:22]
software as a service versus managing. The actual physical infrastructure
[5:55:26]
and amortizing it over time. So it's a very different
[5:55:28]
model with a very different funding profile, okay? So we
[5:55:33]
don't have to buy the servers and then maintain them
[5:55:35]
and amortize. Them. We simply would pay a service provider
[5:55:38]
to provide that service to us. Okay, then the last
[5:55:41]
question is. Sorry, I'm on page 344. I forgot to
[5:55:45]
mention the pages, but page 344, infrastructure operations. Facility $10
[5:55:50]
million from reserve. The eventual infrastructure operations facility. What is
[5:55:58]
that? I'm sorry, I forgot. Thank you. Your worship, this
[5:56:02]
relates to a discussion in the capital planning. The capital
[5:56:07]
plan that we had around. The requirement for growth and
[5:56:12]
our primarily utility areas and the growth of really their
[5:56:16]
works yard that is no longer. An adequate size for
[5:56:20]
them as they continue to grow. So there was some
[5:56:22]
discussion within the capital. Plan around making sure that we
[5:56:25]
had the funds in there to allow for the growth.
[5:56:28]
Of our yards to support our utilities. So it could
[5:56:32]
be somewhere other than hardy street. In other words, Like
[5:56:35]
you said, for capital planning, it's the start. Correct. Okay.
[5:56:38]
Thank you, councilor stock. Please. Thank you. I'd like to
[5:56:41]
just look at. Page 336. Under facility maintenance. And it's
[5:56:49]
kind of a general question on process. So in this
[5:56:52]
particular budget, We have. 2026. Requirement of $810,000. I guess
[5:57:01]
the question in my mind is why is this coming
[5:57:03]
from straight from taxation rather than. Some existing reserve to
[5:57:09]
maintain our buildings because many of our other buildings are
[5:57:13]
maintained through some reserves. But this one seems to go
[5:57:15]
straight to taxation. Thank you, your worship. It's effectively the.
[5:57:19]
Increase in the taxation that goes to the reserve so
[5:57:21]
that we can pull it out to fund the capital.
[5:57:23]
So your way of thinking about it is not incorrect,
[5:57:25]
but what this is saying is. We'd like to add
[5:57:27]
810,000. Dollars to the funding that would go into that
[5:57:30]
reserve that we would then later pull out for. The
[5:57:32]
purposes of facility maintenance. So is this potentially, like a
[5:57:35]
one year thing? So next year, if we see our
[5:57:37]
reserve being built up, it may be funded, our maintenance
[5:57:40]
strictly from the reserve. Thank you. That's something we would
[5:57:44]
always consider as we do our capital planning. As Mr.
[5:57:48]
Edstrom's team has talked about the ongoing work around the
[5:57:52]
facility's master plan will be a big piece of determining.
[5:57:56]
That kind of reconciliation of our funding to our demand.
[5:58:00]
But we also have a performance measure on our deferred
[5:58:02]
maintenance. That I mentioned at the very beginning. And so
[5:58:06]
the team's done some great work to improve that, but
[5:58:08]
there's still a ways to go. So what is the
[5:58:11]
base budget for? Our facility maintenance that this will be
[5:58:13]
adding to. City manager, please. Yeah, well, the finance team
[5:58:18]
is looking up that number. I'll just add. A comment
[5:58:21]
probably similar to. What? The comment I made around maintaining
[5:58:28]
our parks. While we were trending in a great direction,
[5:58:31]
we have a lot of really good data that shows
[5:58:34]
we need to continue to invest significantly in our existing
[5:58:37]
buildings to keep them up to a standard. Both the
[5:58:39]
community council. Employees and contractors are satisfied with. The request
[5:58:45]
that came through the budgeting process. And eventually, through my
[5:58:49]
review, was much larger than this and we have right
[5:58:52]
sized it to fit. Within the targeted taxation rate. So
[5:58:57]
we'll continue to work on improved performance in that area
[5:59:01]
and bring a performance discussion. In future years. We're trending
[5:59:05]
in a good direction, but there's a lot of money
[5:59:06]
that's needed to invest in this area. It's one that.
[5:59:11]
We? I don't want to say ignored, but I'd say
[5:59:13]
that over the years, we didn't fund it to the
[5:59:16]
standard that we perhaps should have, and we're playing a
[5:59:18]
bit of catch up. Thank you, worship. It's 3.4 million.
[5:59:24]
3.83.8 million is the base budget, but. I can tell
[5:59:28]
you in terms of that, in and out of reserve,
[5:59:30]
there's more funds. Coming out of that reserve than there
[5:59:32]
is is going into them. Based on the historical funding
[5:59:35]
file. And so that is definitely one of the areas
[5:59:38]
on the capital side where there is a little bit
[5:59:40]
of pressure, for sure. And just Mr. Edge from reminded
[5:59:44]
me that actually the lighting is for Mission Rec park
[5:59:46]
and that had been identified. Okay. Thank you very much.
[5:59:51]
Council. Any other questions? Comments? Seeing none just from myself.
[5:59:58]
Just before we move this on, Nice to see with
[6:00:02]
regards to performance measure one, with regards to our operating,
[6:00:07]
which used to be at 27 26, now down to
[6:00:12]
24 with regards to the amount of growth that we've
[6:00:16]
had within it so that our operating cost overhead outside
[6:00:19]
of any major infrastructure. Cost is coming down. So good
[6:00:22]
work on the team on looking at managing those particular
[6:00:24]
items. The one thing that I would comment on is,
[6:00:28]
with regards to the request for priorities, looking at as
[6:00:32]
you go into just kind of looking at this. Are
[6:00:34]
all of. Those items accomplishable within this next year, and
[6:00:39]
if they are not accomplishable within this next year. Should
[6:00:41]
they potentially be deferred with regards to restructuring or looking
[6:00:45]
at the overall tax rate. Just as a thought on
[6:00:48]
it. Thank you, worship. That is certainly one of the
[6:00:52]
filters that. We apply. Through finances review and the city
[6:00:57]
manager's review. And there's a number of things that have
[6:01:00]
already been pulled or delayed or pushed later in the
[6:01:04]
plan. So I would say that we're reasonably confident everything
[6:01:07]
in this plan. Is deliverable on the timeline that we've
[6:01:11]
put it. Recognizing on the capital side, we're aiming for
[6:01:14]
approximately 75% of that plan. Recognizing things happen on the
[6:01:17]
capital side. Thank you. Thank you, Melanie. So this service
[6:01:22]
area has two priority, two requests, the first one being
[6:01:26]
the infrastructure. Planning and design request with zero cost in
[6:01:30]
the first year, but 33,300 in 2027. Ongoing and then
[6:01:35]
the IT project feasibility and evaluation at 125,000. Dollars ongoing,
[6:01:41]
both from taxation. Is there any questions council has on
[6:01:45]
either of those priority two requests? Seeing none. Thank you.
[6:01:49]
Your worship. That ends our council deliberations. If you could
[6:01:56]
you please give us a few minutes, we can come
[6:01:59]
back with the start items. Thank you. Council will take
[6:02:05]
just about a five minute break then, please.
[6:19:40]
Thank you. Just going to call this meeting back to
[6:19:42]
order. City clerk, please. Thank you, your worship. We are
[6:19:46]
now in the wrap up and discussion item on the
[6:19:49]
agenda, and I'll go. To the general manager of corporate
[6:19:51]
services. Thank you, your worship. And thank you for the
[6:20:00]
opportunity to go. And look in more detail in light
[6:20:04]
of. The question around are we able to deliver all
[6:20:08]
of. The software and technology improvements within the plan. We
[6:20:13]
do think that there is an opportunity to reduce. Next
[6:20:17]
year's operating impact. Just given the timing of some of.
[6:20:20]
Those actual service or those technology delivery pieces. And so
[6:20:25]
in working with Ms. Antoouns and the city manager, we
[6:20:27]
think that we can find about $200,000 of operating associated
[6:20:31]
with better recognition of the timing. In when those projects
[6:20:35]
will be completed and then the associated ongoing maintenance associated
[6:20:39]
with that. So we do think that we can find
[6:20:40]
that within the budget today. Thank you, Mr. Sass. Thank
[6:20:44]
you. I believe that. Now goes towards your start items.
[6:20:54]
And a discussion around the overall tax rate. Correct. And
[6:20:56]
I do appreciate you reviewing that initial item. That was
[6:20:59]
one of concerns that I had, that there was an
[6:21:01]
opportunity there to lay some of those. So I truly
[6:21:03]
appreciate that. And as you had said, just looking at
[6:21:06]
the start items at this time. So the first start
[6:21:10]
item was two firefighters presented as a priority. Too. It's
[6:21:16]
on page 130 in the financial plan. Thank you. So
[6:21:22]
initially, council, what we need to do with this one
[6:21:24]
is put this on the floor as a motion first,
[6:21:28]
and then we can have discussion around it and then
[6:21:30]
vote on it. From there, please. So I just need
[6:21:34]
a motion on this. This is moved by councilor Singh.
[6:21:37]
And seconded by councilor Hodge. Discussion around this before we
[6:21:42]
vote. Councilor Hodge. Do you have discussion? No, Mr. Mayor.
[6:21:47]
In favor of tutor? I think that we can't. Make
[6:21:50]
any better investment when it comes to adults and safety
[6:21:52]
of our community, then making sure we provide adequate service,
[6:21:56]
and I think this only helps to enhance that ability
[6:21:58]
to guarantee a safer community. So I think it's well
[6:22:01]
worth the investment. Thank you, councilor Sing. Singh. Thank you,
[6:22:06]
worship. And I recognize a lot of work has gone
[6:22:10]
into our budget. And everyone looked at it with a
[6:22:13]
very sharp pencil to ensure we get the best bang
[6:22:17]
for our buck as well as our community is safe,
[6:22:21]
including the chief in this case. But honestly, if we
[6:22:24]
don't keep pace. With the growing community. We're only kicking
[6:22:31]
the ball further down to other councils and a couple
[6:22:35]
of councils later. They're going to have to hire ten
[6:22:37]
more firefighters to keep up. I'm just. Throwing that figure
[6:22:40]
out to keep up with the growing community. So what
[6:22:43]
I'm saying, just. Like increasing. Our taxes little by little.
[6:22:50]
And not little by little to keep up. With the
[6:22:53]
needs of the community. I think it's important we keep
[6:22:57]
up with the need. Or. The formula that is in
[6:23:04]
place. To have. Enough. First responders. In comparison to the
[6:23:12]
growing community. So I will, of course, be supporting this.
[6:23:16]
I brought this to the floor. So I think it's
[6:23:18]
important. I think I'd like to see council. Give it
[6:23:20]
some thought. We have rolled back on the lights. That
[6:23:26]
was a million dollars that was going to be on.
[6:23:27]
The budget. The lights on the bridge, though it comes
[6:23:32]
from two different parts. It's still money. That is the
[6:23:37]
city. So if there's any juggling that can be done
[6:23:39]
at the end of the day. I would appeal to
[6:23:43]
my council colleagues to really give this a thought. Thank
[6:23:46]
you, councilor stack. Thank you, worship. And thank to my
[6:23:50]
colleague for her comments. I guess from my interpretation of
[6:23:53]
this and reading the plan. We do have a safety
[6:23:57]
levy of 1% that we've added every single year, and
[6:23:59]
we're using that to add police officers as well as
[6:24:03]
firefighters and. Other safety services, but those are really the
[6:24:07]
two big ones. And when I look at the plan,
[6:24:10]
It's been laid out by staff. I feel the addition
[6:24:12]
of. Four additional firefighters this year is the appropriate level.
[6:24:17]
That's the priority one that they want. And have asked
[6:24:19]
for, and I feel good. We'll fund that, and we're
[6:24:23]
going. With what the request is. I don't think we
[6:24:25]
need to go beyond that. We know. We've got a
[6:24:27]
very strategic plan in place to build our Glenmore hall
[6:24:30]
and staff. It, which we asked earlier today, I think.
[6:24:34]
We're right on track with our fire department. I'm very
[6:24:35]
proud of the service. Levels that they're offering, and I
[6:24:38]
think the request for Ford is the correct request, so.
[6:24:41]
I won't be supporting the two additional firefighters beyond that.
[6:24:45]
Thank you, Councilor Wolbert. Please. Thanks for worship. I certainly
[6:24:49]
respect our fire department and all the hard work that
[6:24:52]
they do to improve safety in Kelowna. There's a little
[6:24:56]
bit of work that's going on in 2026. That I
[6:24:58]
think is very important to inform further investments and councilor
[6:25:02]
stack already alluded to the safety levy was. One of
[6:25:05]
those steps was to have consistent and steady investment into.
[6:25:09]
Safety, which is what's allowed us to bring on those
[6:25:11]
four members and bring on members. Every single year. But
[6:25:14]
what I think is really important for council to have
[6:25:17]
the discussion about is the resourcing plan that's coming forward
[6:25:19]
in 2026, I would much rather have that discussion and
[6:25:23]
discuss service levels before ad hoc, adding more members without
[6:25:28]
hearing the full. Rationale behind it. There's been an immense
[6:25:32]
amount of rigor that's gone. Into the budget that's presented
[6:25:34]
today, both from Chief Seymour and the city manager. So
[6:25:37]
I won't be supporting the additional members this year. But
[6:25:40]
I would be interested to know what comes out of
[6:25:42]
the 2026 resourcing plan. In the future because I know
[6:25:46]
there's a little bit of a rub between the NFPA
[6:25:48]
standards and other industry led initiatives. So I think it's
[6:25:52]
important that if council we have that resourcing study before
[6:25:55]
we make further investments. Your worship. Thank you, councilor. Councilor
[6:25:58]
Lovegrove, please. Thanks, your worship. I appreciate my colleagues being
[6:26:04]
reluctant to support this and others that are behind it,
[6:26:06]
so. I see that this is specifically for station one.
[6:26:14]
We've got new high rises coming online. So it's not
[6:26:17]
just about wildfires and being in tinder box each summer
[6:26:20]
is actually, absolutely. As my colleagues have said, it's about
[6:26:23]
growth. And being able to get up and out as
[6:26:28]
we are growing, especially downtown. This is now maybe I'm
[6:26:32]
wrong. But. I also recognize our chief is in the
[6:26:38]
room. And would have been part of the discussion to
[6:26:42]
put this to a priority, too. So I see. Both
[6:26:44]
sides of this. And I'm just asking, your worship, is
[6:26:47]
it appropriate that perhaps we let the expert in? The
[6:26:49]
room. Speak to why this became a priority too? No,
[6:26:52]
counselor. So we have to decide this. On its own
[6:26:55]
merits. Well, I'd like to hear the rest of my
[6:26:58]
colleagues before I vote on this or. Maybe we don't
[6:27:01]
have. And we got a call to question, but I'm
[6:27:02]
uncomfortable. Voting on this without hearing from the experts. Sorry.
[6:27:07]
Councilor. I don't see any other. Is there more comments?
[6:27:13]
Councilor stack, did you have another comment on that? Thank
[6:27:16]
you. So that's where councilor cannon. Thanks, your worship. Just
[6:27:18]
is going to remind the council we did hire additional
[6:27:21]
four last year as well. Correct. Just one thing. Yes,
[6:27:25]
thank you. Any other comments? Seeing none, I will comment
[6:27:30]
on it. I think that this whole council recognizes the
[6:27:33]
value of the fire department and Chief Seymour and what
[6:27:36]
he's been able to do with it, and we have
[6:27:38]
been at a number of functions in the last few
[6:27:40]
years with the induction. Of new members as. Fire members
[6:27:45]
to our community, and we want to continue along that
[6:27:48]
line, but we have to put our faith in those
[6:27:50]
individuals that turn around and establish these budgets for us.
[6:27:53]
And there was great consultation with the chief. There was
[6:27:55]
consultation with the city manager and that whole team. We
[6:28:00]
are also looking at going through a process of more
[6:28:02]
of a service delivery model next year. With regards to
[6:28:05]
the number of individuals that we need into the future,
[6:28:08]
you can compare it to many different comparisons with regards
[6:28:11]
to whether we have the need or whether we don't
[6:28:13]
have and I'd rather go through that process and make
[6:28:15]
an informed decision more so than go to a point
[6:28:18]
of making something. Where it's an item that it ends
[6:28:21]
up being we haven't backed up with. Any data and
[6:28:23]
we have not informed that information. So I basically put
[6:28:26]
it as an uninformed decision at this particular point in
[6:28:28]
time. So, seeing no further questions, I call the questions
[6:28:31]
all in favor. Opposed. It does not. Carry. And, Chief
[6:28:37]
Seymour, you know that's with the utmost respect of you
[6:28:40]
and your team. Thank you very much for everything you
[6:28:42]
do for our community. Melanie, please. Thank you, your worship.
[6:28:47]
The next starred item is the Kelowna go by week,
[6:28:50]
go by Bike week. Apologies. $45,000 funded from taxation. Thank
[6:28:56]
you. This is moved by Councilor Woolridge, seconded by. Councilor
[6:29:05]
Lovegrove. And it has discussion around it. Councilor Wolverich, please.
[6:29:12]
Thanks for worship. I think this is a flagship event
[6:29:15]
in Kelowna. That's a relatively low number. It improves different
[6:29:18]
modes of transportation. And at a $45,000 investment, I think
[6:29:22]
there could probably be a way to finance this. Into
[6:29:26]
a billion dollar budget. So a bit surprised that this
[6:29:28]
was going to end the program in Clona's involvement, so
[6:29:30]
I'm supporting. It because it's a relatively low investment, but
[6:29:35]
it does bring community together, and it's an important event
[6:29:37]
in the community. Thank you, Councilor Lovegrove. Please. Yeah, I
[6:29:40]
couldn't. Agree more. It's one of council's priorities to get
[6:29:43]
folks out of their cars. And this is just another
[6:29:45]
way to encourage folks to get informed, get educated, get
[6:29:49]
onto a bike and try active living. It's also impacting
[6:29:54]
and benefits our health. We put hundreds of thousands of
[6:29:59]
dollars in the bike paths. We better use them, and
[6:30:02]
I think this is one way to encourage that use,
[6:30:04]
and it's ongoing. We need this. Not approving this. Would
[6:30:09]
actually cancel the bike to work week for Clona. That's
[6:30:11]
not a reputation I want to have on city council.
[6:30:16]
Thank you. Councilor Stack, please. Yes, I just wonder. There
[6:30:19]
was some discussion in the presentation today. About perhaps looking
[6:30:22]
for other community involvement in this particular program, perhaps a
[6:30:27]
partnership. And I wonder if this is something that couldn't
[6:30:29]
be handed over to our partnerships office to consider seeing
[6:30:32]
if there was some sponsors or others that would like
[6:30:34]
to participate so that. The city doesn't carry 100% of
[6:30:37]
this cost, and maybe there's opportunities to. Find. Teamwork through
[6:30:42]
the partnership office. Just a suggestion, councilor Stacca. Maybe just
[6:30:45]
get the city manager to address your question, please. Yeah.
[6:30:48]
Thank you. Your ship. If I'm reading the tea leaves.
[6:30:51]
There seems to be a bit of general support for
[6:30:53]
the idea of this program. And if council were to
[6:30:56]
direct us to look for funding source and bring it
[6:30:58]
back prior to final budget. Be happy to do that
[6:31:01]
for you. Prior to final budget. We'll look for a
[6:31:07]
funding source, either internally or through a partnership, and see
[6:31:10]
if we can find a way to fund it for
[6:31:11]
you and bring it back as part of final budget.
[6:31:15]
Council deart comments well, I just think that's a great
[6:31:18]
idea. Both. From the city manager and from councilor Stack,
[6:31:24]
as I think there will be people out there. That
[6:31:26]
would like to support it. Not that it's, and because
[6:31:29]
of the amount that it is, but I think a
[6:31:31]
partnership would be really great and. That would take also,
[6:31:34]
they would probably like to enhance the event and do
[6:31:38]
the event instead of the city doing it. I think
[6:31:40]
it would be really great. I would certainly be in
[6:31:42]
favor of that. Thank you. I'm going to ask the
[6:31:44]
city clerk just to kind of put those. Words into
[6:31:48]
an understanding, and then we can go from there. I
[6:31:51]
know where it's up. And there's a motion, and this
[6:31:54]
has been moved, and we were speaking to it, but.
[6:31:58]
I'll let her speak, and then we'll go from there.
[6:31:59]
Please. Thank you, worship. So with the intent to identify
[6:32:03]
a funding source that would have no impact on taxation,
[6:32:06]
of course. That would be. Pending. Those discussions and negotiations,
[6:32:12]
but the direction would be that council amends that. Kelowna,
[6:32:14]
go. By bike, p two. Item on page 204 to
[6:32:17]
p. One and direct staff to identify a funding source
[6:32:20]
for final budget considerations with no impact on taxation. This
[6:32:25]
has been moved and seconded, so I'm going to ask
[6:32:27]
the question all in. Favor. Opposed. Carried. Thank you. Thank
[6:32:33]
you, your worship. The next one is the one that
[6:32:35]
Mr. Sass identified. Is the reduction of the operating and
[6:32:40]
maintenance of some. It major system enhancement projects that is
[6:32:46]
not required in 2026. So a reduction of $200,000. So
[6:32:52]
can I have a mover on that, please? Move by
[6:32:54]
Councilor Weber, seconded by. Councilor Lovegrove. I'm not certain there's
[6:32:57]
any discussion on that required. If there isn't. All in
[6:32:59]
favor? Opposed. Carried. Thank you. Thank you, your worship. So
[6:33:05]
that results in an end of day tax increase of
[6:33:09]
4.37%. Wow. Fantastic. Mr. Sasson team. That is amazing. Thank
[6:33:16]
you very much for the work that you did. And
[6:33:18]
thank you for making that all work out. Very, very
[6:33:20]
much appreciated. City clerk, please. Thank you, worship. With that
[6:33:24]
in mind, we do need a final motion and resolution
[6:33:27]
from council that reflects. That final tax increase. So this
[6:33:31]
would be that. The 2026 financial plan, volume one preliminary
[6:33:35]
budget, as amended by council and resulting in a 4.37%
[6:33:40]
tax increase be approved subject to final budget considerations. Thank
[6:33:44]
you. Just before I move. That forward. I'm just wondering.
[6:33:46]
From the finance team, Mr. Sasswell. Is there any more
[6:33:50]
comments? I thank you for the work that you've done.
[6:33:52]
I think it is very clear what council will be
[6:33:54]
voting on and commenting on. No further comments. Just to
[6:33:58]
thank you to Mel, who carries the torch all day.
[6:34:03]
And Jay and his team. And you can't see Jay's
[6:34:05]
team, but they're in the back somewhere answering all of
[6:34:09]
our, what is our opening budget? Questions, and so just.
[6:34:11]
A big thank you to Mel and Jay and the
[6:34:14]
rest of the budget team that you can't see for
[6:34:16]
all their great work. Thank you.
[6:34:29]
Thank you, Mr. Sass. And Melanie, obviously, thank you. Any
[6:34:32]
comments that you would like to make? Before we move
[6:34:34]
on? No, thank you, you, worship. Thank you. Didn't mean
[6:34:42]
to put you on the spot. Be polite. You've heard
[6:34:46]
enough of me today. That's why we have her. I'm
[6:34:51]
just going to go back to the city clerk one
[6:34:53]
more time, just for clarification. To kind of state exactly
[6:34:56]
what we're voting on on this last phase. Thank you,
[6:34:59]
worship. So with the amendments that council has decided on,
[6:35:04]
The final resolution that we are looking for is that
[6:35:06]
the 2026 financial plan, the volume one. Preliminary budget, as
[6:35:10]
amended by council and resulting in a 4.37% tax increase,
[6:35:15]
be approved. Subject to final budget considerations. Thank you. So,
[6:35:19]
do I have a mover? Please move by councilor. Wolverge
[6:35:21]
seconded by councilor Hodge. Discussion. Just before we vote on
[6:35:25]
it, councilor Singh. Okay. Thank you. So, discussion councilor Dehart.
[6:35:34]
I think this has been a really good budget, and
[6:35:36]
I really like the way that it was. Presented. I
[6:35:39]
remember how we used to pull pages and mail. You
[6:35:42]
sat there. But anyway. In not even saying that. Thank
[6:35:47]
you. I really want to say thanks to the staff,
[6:35:50]
including the city manager Laura everybody. Mr. Sass, your team
[6:35:54]
and council really like to thank council for the robust
[6:35:58]
discussion. I think it was a very good budget, and
[6:36:00]
I'm really happy at the percentage that we came to,
[6:36:04]
and I think that the citizens will be very. Happy
[6:36:07]
with what we've given them, considering they're always asking us
[6:36:10]
for added services. And I think we've done a great
[6:36:12]
job. And compared to just about everybody else in the
[6:36:16]
province. I think that we've done an exceptional job. So
[6:36:20]
thank you. Thank you, councilor stock. Please. Thank you. I'll
[6:36:24]
continue on with the accolades. I want to thank our
[6:36:27]
city manager. Because I know this is not a day
[6:36:29]
project. This is about a six month project. And Mr.
[6:36:32]
Sass and Melanie as well, for an excellent presentation today,
[6:36:36]
but overall. The one document that Mr. Sass handed out
[6:36:41]
this morning which shows the cumulative tax increases over this
[6:36:45]
term for ourselves and many of our comparative cities. Really
[6:36:51]
emphasizes the consistency that the city has adopted to keep
[6:36:54]
our tax increases between four and 5%. On a consistent
[6:36:58]
basis. Which I know sometimes sounds a lot, but when
[6:37:00]
you put it in perspective to what the other cities
[6:37:02]
are doing. I think any of them would be thrilled
[6:37:07]
if they could come up with a budget like this.
[6:37:09]
But on top of that, it's not just the budget
[6:37:12]
amount. And what we're charging. The amount of development and
[6:37:18]
capital projects that we are doing is phenomenal. Like I've
[6:37:22]
been on council for many, many years, and we've never
[6:37:25]
seen anything like our road packages. Expanding. We've never seen
[6:37:29]
anything like our community centers that are underway. The Parkinson's.
[6:37:32]
Breck center. The new community center in Rutland, a new
[6:37:36]
community center in the mission and one in Glenmore. Which
[6:37:39]
has been on the books for years and years. But
[6:37:41]
when you look at the cumulative amount of work that's
[6:37:44]
being accomplished at the same time that we're able to
[6:37:46]
keep our taxes at this low level. Is phenomenal. And
[6:37:50]
it goes back to very, very good strategic financial planning
[6:37:54]
that we're able to do this. I was just listening
[6:37:56]
to a story very briefly the other day about Prince
[6:37:58]
George is looking at closing their main pool for two
[6:38:00]
years because their maintenance has fallen so far. Behind that
[6:38:04]
they're looking at, they would lose two years of swim
[6:38:06]
programs. And you can just imagine the kind of impact
[6:38:09]
that would have. On their community. But here we're looking
[6:38:12]
at adding. A brand new ten lane pool to ours,
[6:38:17]
as well as maintaining the existing services we have. So
[6:38:20]
I just think it's something we as a council, and
[6:38:22]
I think the city staff. Should take great pride in
[6:38:24]
the amount of things that are being accomplished at the
[6:38:26]
budget that we're bringing forward, so kudos to all. Thank
[6:38:30]
you. Councilor Singh, was that you? Thank you. I didn't
[6:38:35]
realize. I was supposed to comment at that stage when
[6:38:39]
you asked me to speak, but I, too, concur. With
[6:38:42]
what my colleagues say. Thank you, Mr. Sas. For taking
[6:38:47]
all my basic questions and walking me through everything. And
[6:38:52]
simplifying it for me. Thank you, Mel. Thank you, team,
[6:38:56]
for everything. And your worship. We should be so proud
[6:39:01]
that. With such a progressive city that's growing so fast.
[6:39:06]
We're still able to keep our taxes at the level
[6:39:08]
they're at and provide the service to the best of
[6:39:11]
our ability. We have issues that we're dealing with that
[6:39:14]
are not municipal issues, and yet. Though we are spending
[6:39:20]
money on end, we're still able to keep our taxes
[6:39:24]
at the lower end of the spectrum. I just want
[6:39:26]
to take a second. And thank one of our citizens
[6:39:29]
who comes every year. Thank you very much for your
[6:39:33]
interest and support. In our budget. You came late today.
[6:39:37]
I was looking for you this morning. Thank you for
[6:39:39]
being. Here. Thank you, worship. Thank you, councilor. Love, girl,
[6:39:42]
please. Thanks to your worship. It's not lost on me
[6:39:46]
that the opening comments from our city. Manager said if
[6:39:49]
not for the ability of his expert team, we would
[6:39:53]
be looking at an 11% tax increase. And this is
[6:39:57]
4.37. It's even below what we started with. During the
[6:40:00]
day. So I just want to thank the city manager
[6:40:03]
and his team for that. Having said that, and I
[6:40:06]
suspect. There will be other colleagues that echo this comment.
[6:40:13]
Citizens see the inflation rate at 2.6. So we need
[6:40:18]
to be cognizant of we are above the consumer price
[6:40:21]
index and we had the report on. Was it Monday?
[6:40:24]
About the municipal. We're even below the municipal price index
[6:40:27]
increase if you look at that. That was 4.9. All
[6:40:30]
that to say. It's tough, but I appreciate that during
[6:40:34]
this term. We've been fiscally responsible overall compared to our
[6:40:38]
comparator communities. Everybody's in the same boat, and we're doing
[6:40:42]
the best we can, and I. Think we've got the
[6:40:44]
best team to do the best we can. Thank you,
[6:40:47]
councilor. Cannon, please. Thank you, worship. And, yeah, Cologne is
[6:40:51]
an exceptional city, and I'm honored to serve with you
[6:40:54]
folks and the residents who call at home. And we've
[6:40:58]
got some exciting things happening, especially if the upcoming Memorial
[6:41:02]
cup hosting the lions. BC's summer games. A lot of
[6:41:07]
great things, and I want to acknowledge the hard work
[6:41:09]
of our staff and the many positive developments that contribute
[6:41:11]
to the quality of life. However, with that acknowledgment must
[6:41:14]
come responsibility. And today our responsibility is fiscal stewardship. So
[6:41:19]
more and more I hear from concerns from residents. That
[6:41:23]
the overdevelopmental proper infrastructure, parking problems. We continue to have
[6:41:28]
issues with regard to worsening Tropic, as Mac alluded to
[6:41:32]
millions spent in homelessness and community safety with limited results
[6:41:35]
and taxes that continue to place inflation. Many employers are
[6:41:40]
finding it difficult. To find and retain staff because of
[6:41:43]
the cost of living in Clona, especially the affordability of
[6:41:45]
housing residents, likewise are telling me they're struggling to keep
[6:41:49]
up with rising expenses, so I also understand the MPI
[6:41:53]
or municipal price index as the cost of city incurs
[6:41:56]
to operate. As my steam colleague across the way mentioned
[6:42:00]
on Monday. It's a resident, especially seniors and folks on
[6:42:03]
fixed income. It doesn't matter because. Their income is based
[6:42:07]
on consumer price index, or CPI, which actually right now
[6:42:10]
in BC is 2.3%. So this 4.3% increases about 45%
[6:42:16]
above the CPI and simply more than many households, I
[6:42:18]
believe, and businesses can manage at this time because. We're
[6:42:22]
living in some very. Uncertain economic times. Unemployment is elevated.
[6:42:28]
And budget proposes to add additional staffing to grow by
[6:42:32]
40% beyond the population growth to me. That's not sustainable.
[6:42:36]
So fiscal responsibility requires discipline, prioritization and efficiency. So bigger.
[6:42:42]
Budgets and larger bureaucracies do not automatically produce better outcomes.
[6:42:47]
Citizens also told me that our current homelessness strategy is
[6:42:49]
not reducing illegal sheltering across the community. Many states actually
[6:42:53]
gotten worse, which I talked about earlier this morning. If
[6:42:56]
we want better results, I believe we need to take
[6:42:57]
a different approach. Our residents expect us to focus on
[6:43:00]
core services. And essential. So when council considers multimillion dollar
[6:43:04]
decorative signage where many families are struggling with. Basic expenses.
[6:43:07]
To me, it sends the wrong signal about our priorities.
[6:43:11]
So, you worship, for all these reasons, and out of
[6:43:12]
respect for the financial capacity our community, I cannot support
[6:43:15]
the 4.37% tax increase. I believe fiscal responsibility is not
[6:43:20]
simply an accounting. Exercise. It's a commitment to ensuring that
[6:43:23]
government lives within its means. Justice families are expected to
[6:43:26]
do every day. I hear that over and over, all
[6:43:29]
levels of government are living beyond their means and. I
[6:43:31]
believe colonial is no exception. So I believe we can
[6:43:33]
deliver responsible budget, but only if we focus on essential
[6:43:36]
strength and accountability efficiencies and align tax increases with what
[6:43:40]
residents can realistically afford. Thank you, worship. Thank you. Councilor
[6:43:44]
Hodge, please. Thank you, Mr. Nair. Well, first of all,
[6:43:49]
ingest, but not give me my fireman now. If we
[6:43:53]
did so well. That being said, I want to jump
[6:43:58]
in on. The low fest for our staff and our
[6:44:03]
city and appreciate you for the kind of day we've
[6:44:07]
had. And. Although everyone might agree, I think a superb,
[6:44:14]
well handled. Taxation budget. And I just want to make
[6:44:20]
a side comment. Earlier tonight, during the deliberations, I had
[6:44:25]
a little choking session. Not uncommon. And I was talking
[6:44:32]
pretty good, and I went around the door and opened
[6:44:34]
the corner because they didn't want to disturb the entire
[6:44:37]
room. And the next thing you know, someone's hands on
[6:44:41]
my back. Great concern in his voice and says, are
[6:44:44]
you okay? Can I help you? This is Mr. South.
[6:44:49]
Now here's a man. I'm supposed to be the most
[6:44:52]
important day of his year. Under full stress, I'm sure
[6:44:58]
responsible for the entire performance. He's made his whole thing
[6:45:02]
work, and he's in the back alley here with a
[6:45:07]
whole little counselor of my house. That's a character of
[6:45:11]
the man, that he would take the time. And this
[6:45:15]
moment to care about someone else and thought, I just
[6:45:18]
want to thank you. It's a quality person. That does
[6:45:23]
that. And I just thought today of all days for
[6:45:26]
him to do that, so I just want to say
[6:45:28]
thank you, and I think it's important that I'd say.
[6:45:30]
That and follow up because you deserve it. Thank you,
[6:45:32]
Mr. Mayor. Councilor Hodge. Thank you. And Mr. Sass. Thank
[6:45:36]
you, Councilor Wolverich, please. Thanks for worship. Being this is
[6:45:43]
our final budget of this term, which is hard to
[6:45:45]
believe. I do want to take a little bit of
[6:45:47]
time and so bear with me. I just want to.
[6:45:50]
Really want to say that I'm really proud of the
[6:45:52]
city that. We're building together, along with council and some
[6:45:55]
of the best 1200 staff in Canada in my view,
[6:45:58]
including our city manager. Director, finance and the senior leadership
[6:46:02]
team and everyone that supports them. It's not lost to
[6:46:06]
me that we've accelerated our capital program by more than
[6:46:08]
300% and a pace of investment that the city has
[6:46:12]
never seen before. Some of my colleagues have mentioned wanting
[6:46:15]
to see more capital investment into infrastructure to support housing
[6:46:19]
and that's what we've been doing. We've been building more
[6:46:21]
parks, recreation facilities. Public spaces and a scale that has
[6:46:25]
been unmatched. From previous council terms, and the budget for
[6:46:31]
me really had no surprises. It reflected numerous council meetings
[6:46:35]
and collective decisions where we all came together. And with
[6:46:40]
administration to inform the financial plan. This doesn't just happen
[6:46:42]
in one day. And the majority of the budget isn't
[6:46:46]
taxpayer funded, and we're one of the only municipalities that
[6:46:48]
does that. We rely on revenues, grants, fees and charges.
[6:46:53]
And many service reviews of different departments to make sure
[6:46:55]
that we're operating optimally and with that colon has always
[6:46:59]
had the methodology of a consistent, stable and predictable tax
[6:47:03]
rate. When we saw the chart at the beginning of
[6:47:06]
the meeting. We saw how there's peaks and valleys. Through
[6:47:08]
different municipalities, and we've always maintained consistency in that 4%.
[6:47:14]
So that we're predictable. Most of what we saw in
[6:47:16]
the budget were contractable. Obligations like policing and fire and
[6:47:22]
wage agreements dealing with rapid population growth and then also
[6:47:27]
resident expectations. To maintain and improve our services. As counselors,
[6:47:32]
our inboxes are often filled with more demands for investment
[6:47:36]
into safety, transit parks. It goes on and on. And
[6:47:40]
then we forward those on to the city manager. With
[6:47:43]
requests and demands like sandy dumps and other solutions that
[6:47:48]
we ask for. And we ask them to be done
[6:47:49]
quickly, and we ask them to be done. To make
[6:47:53]
lives better. In fact. The public are reaching out to
[6:47:56]
save $50,000 programs to make sure that they can be
[6:47:59]
enjoyed in the community, and so that doesn't happen by
[6:48:02]
accident and predictability. Requires planning and investment, and so for
[6:48:08]
me to be responsible is to respond to that. And.
[6:48:13]
It's unfortunate that when people say our tax rate is
[6:48:16]
too high, they aren't. Proposing what we should cancel or
[6:48:18]
what we should reduce. That doesn't solve the tax rate
[6:48:23]
to vote against the financial plan year after year and
[6:48:26]
still attend groundbreaking. Groundbreakings. These projects don't happen by accident.
[6:48:34]
They're responsible investments and deliberate choices and disciplined budgeting that
[6:48:39]
the city manager and the team bring forward. So I'm
[6:48:41]
really excited and pleased to see what the city that
[6:48:44]
we're building. And that's what responsible decisions do, your worship.
[6:48:48]
So I'm really. Happy to support the plan today as
[6:48:50]
our final plan at this term. Thank you. Thank you,
[6:48:52]
councilor. Councilor Weber. Please. Well, I didn't write out a
[6:48:56]
fancy speech, but thinking about the budget, I'm. Thinking about
[6:48:59]
when I moved to Kelowna here over 30 years ago,
[6:49:01]
35 years ago now. And you think of the state
[6:49:04]
of the city today and things that are under our
[6:49:06]
responsibility for instance, traffic. Traffic is getting heavy. Majority of
[6:49:10]
colonial residents, I'm absolutely sure, want us to. Expand and
[6:49:12]
improve the road network. I don't think they'd like it
[6:49:14]
if we. Voted no. Against that. I have my friends
[6:49:17]
who have kids who have been had a long waiting
[6:49:19]
list for swimming lessons. They're extremely pleased. There's a Parkinson
[6:49:22]
rec center going in. I don't. Think the majority clonor
[6:49:24]
residents would be happy if we voted against it. I
[6:49:26]
think if we all join that, let's vote no against
[6:49:29]
it, I think. We'd have a lot of disgruntled people
[6:49:32]
on our hands in Kelowna. I think what we're doing,
[6:49:35]
what colonial residents want us to do, we're doing it
[6:49:37]
at a cost that we said we would do at
[6:49:39]
the tax increase. We said we would do. So I'm
[6:49:41]
proud to vote in favor of this budget. And I
[6:49:44]
think it's unwise to start keep voting against it. Counsel.
[6:49:48]
Thank you. I think I want to start off by
[6:49:52]
just obviously thanking our city manager. Thanking Mr. Sassa's team.
[6:49:59]
Thanking senior leadership and thanking the 1200 or so employees
[6:50:05]
that help us deliver upon our priorities. Mr. Sass started
[6:50:09]
out today, and he spoke about our tax rate as
[6:50:13]
it compares to other communities within the province on a
[6:50:17]
single year basis. And showed us exactly where it was
[6:50:22]
sitting. He showed us our tax rate over a four
[6:50:26]
year. Cumulative type of structure. Against 16 other communities in
[6:50:32]
the province. And that we were the lowest. He showed
[6:50:36]
us with regards to. Where our employee numbers were from
[6:50:40]
an operational standpoint. One time had an operational expense of
[6:50:45]
27 28% and. We're now staff and them have get
[6:50:50]
it down to 24%. This is the first time this
[6:50:54]
city has seen a budget that is over a billion
[6:50:57]
dollars. The delivery of capital that. We are advancing within
[6:51:04]
this community because this council has asked to look at
[6:51:08]
doing that. And council. You're correct. I mean, we celebrate
[6:51:12]
groundbreakings and we celebrate events, and we. Cut ribbons. And
[6:51:16]
the reason why we look at doing that is because.
[6:51:19]
We advance. These. Tax rates. We advance budget day because
[6:51:26]
there's a plan to look at making this community a
[6:51:29]
better city, so. I am very grateful for the process
[6:51:34]
that we go through now when we look at our
[6:51:38]
budget. It is not a one day event. It comes
[6:51:43]
to us four times a year. I look at some
[6:51:47]
of the questions that came up today. And none of
[6:51:51]
them were truly financial questions. More of them were theater.
[6:51:57]
And it's regrettable because what we're dealing with is the
[6:52:01]
financial issues and concerns that it ends up being that
[6:52:04]
we have within this community. So I am grateful for
[6:52:10]
the team on what they've looked at doing. We need
[6:52:13]
to continue to advance this. I am grateful that. It's
[6:52:17]
consistently within the range that they're looking at advancing on
[6:52:20]
a tax rate. Basis. And all of the checks and
[6:52:24]
balances that we have and that our finance team does
[6:52:28]
on a year by year basis makes a difference when
[6:52:31]
we get to this day. So I am very grateful.
[6:52:34]
And thank you and counsel, thank you for establishing those
[6:52:37]
priorities so we could advance those initiatives. Within this community,
[6:52:41]
and that's the true. Reality of it more so than
[6:52:44]
just an aspect of talk. With all that in question?
[6:52:49]
I asked the question. All in favor? Opposed. Councilor cannon
[6:52:54]
opposed? Again to everyone. Thank you very much. We are
[6:52:59]
adjourned.