Agenda
[0:18]
CALL TO ORDER / ROLL CALL Commissioner Clarence Daniels, Jr.; Commissioner Courtney La Bau; Commissioner Victor Narro; Commissioner Nicholas P. Roxborough; Commissioner Valeria C. Velasco; Vice President Vanessa Aramayo; President Matthew M. Johnson
[5:16]
ELECTION OF OFFICERS pursuant to Los Angeles City Charter Section 503 (a)
[6:58]
OPENING REMARKS
[10:13]
MANAGEMENT REPORTS & PRESENTATIONS
[10:15]
Chief Executive Officer Update
[19:52]
PUBLIC COMMENTS ON NON-AGENDA ITEMS WITHIN THE JURISDICTION OF THE BOARD
[31:28]
NEIGHBORHOOD COUNCIL COMMENTS - An opportunity for Neighborhood Council representatives to provide their respective Neighborhood Council’s formal position on any matter listed on this meeting agenda for the Board of Airport Commissioners. (A Neighborhood Council, through its authorized representative, shall provide the Board with a copy of its Community Impact Statement filed with the City of Los Angeles Office of the City Clerk or Resolution regarding its formal position.)
[31:33]
APPROVAL OF MINUTES
[31:37]
June 18, 2026 Special Meeting
[32:05]
CONSENT ITEMS FOR BOARD ACTION [Consent Items 1 - 11]
[33:58]
RESOLUTION NO. - Adoption of the staff report; and Approval of the Acceptance of a Grant Offer from the Federal Aviation Administration: For the purchase of vehicle movement area transmitters for Los Angeles International Airport and Van Nuys Airport (Antoinette Chandler)
[34:00]
REGULAR ITEMS FOR BOARD ACTION [Regular Items 12 - 18]
[41:23]
RESOLUTION NO. - Adoption of the staff report; and Approval of the Award of a three (3)-year Contract to Sully-Miller Contracting Company Inc.: For construction of the Taxiway A West and Taxiway F Reconstruction Project at Los Angeles International Airport, for cost not to exceed $81,983,603; and appropriation of $108,383,603 for said project (Jacob Adams)
[49:46]
RESOLUTION NO. - Adoption of the staff report; and Approval of the Appropriation of capital funds not to exceed $17,848,000: For the Access Control and Alarm Monitoring Systems, Computer-Aided Dispatch and Records Management System, and Video Management System Upgrade Project of Los Angeles World Airports (Aura Moore)
[52:56]
RESOLUTION NO. - Adoption of the staff report; and Approval of a five (5)-year Contract with Solar Turbines Incorporated: Covering service, maintenance, and repairs for two (2) Mercury 50 gas turbines located at the Central Utility Plant at Los Angeles International Airport, for cost not to exceed $16,000,000 (Douglas Webster)
[58:12]
RESOLUTION NO. - Adoption of the staff report; and Approval of the Second Amendment to Contract DA-5660 with Uniserve Facilities Services LLC: To extend the term by one (1) year, for new expiration of October 22, 2027, with a one (1)-year renewal option, and increase the contract authority by $3,200,000, for new total not to exceed $7,000,000, covering ramp scrubbing, cleaning, and sweeping services at Los Angeles International Airport (Douglas Webster)
[1:02:14]
RESOLUTION NO. - Adoption of the staff report; and Approval of the Award of a three (3)-year Contract to Baker Tilly US LLP: With two (2) one-year extension options, covering external auditor services for Los Angeles World Airports, for cost not to exceed $1,650,000 (Antoinette Chandler)
[1:09:06]
RESOLUTION NO. - Adoption of the staff report, including the Resolution (identified as Attachment A to the staff report), to approve and authorize execution of agreements for Direct-Pay Letters of Credit and other related documents: And take certain other actions with respect to the Los Angeles International Airport commercial paper program to approve the appointment of Bank of America N.A. to provide a five (5)-year letter of credit to cover up to $300 million aggregate principal, plus $27 million in interest, and the appointment of T.D. Bank N.A. to provide a five (5)-year letter of credit to cover up to $200 million aggregate principal, plus $18 million of interest (Antoinette Chandler)
[1:13:58]
RESOLUTION NO. - Adoption of the staff report, including the Resolution (identified as Attachment A to the staff report) to authorize the issuance of the Department of Airports of the City of Los Angeles, California, Los Angeles International Airport, Senior Series 2026 Revenue and Refunding Revenue Bonds in multiple series: In an aggregate principal amount not to exceed $3 billion; and approval of documents related to the aforementioned actions and certain other related matters and actions (Antoinette Chandler)
[1:37:41]
CLOSED SESSION ITEMS
[1:40:26]
ANNOUNCEMENT OF ACTIONS TAKEN IN CLOSED SESSION
[1:40:37]
COMMISSIONERS’ REQUESTS TO CALENDAR AGENDA ITEMS
[1:40:45]
OTHER REPORTS AND INFORMATION
[1:41:31]
ADJOURNMENT
Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
[0:01]
Good morning, everyone.
[0:04]
Morning!
[0:05]
Good morning.
[0:06]
Good morning and welcome
[0:07]
to the Board of Airport
[0:08]
Commissioners Special Meeting
[0:10]
on July 9th, 2026.
[0:12]
This meeting is now called
[0:13]
to order at 10 a.m.
[0:16]
Please call the roll.
[0:18]
Commissioner Daniels.
[0:20]
Here.
[0:21]
Commissioner La Bau.
[0:22]
Present.
[0:23]
Commissioner Narro.
[0:24]
Here.
[0:25]
Commissioner Roxborough.
[0:26]
Here.
[0:27]
Commissioner Velasco.
[0:28]
Vice President Aramayo.
[0:29]
Present.
[0:30]
President Johnson is absent.
[0:33]
Thank you.
[0:34]
Before anything else...
[0:35]
I do want to welcome our new
[0:37]
board member, Commissioner
[0:38]
Daniels.
[0:45]
Congratulations on your recent
[0:46]
appointment.
[0:47]
I know I speak for the board
[0:48]
when I say we look forward
[0:49]
to working with you, and I'd
[0:51]
like to welcome you
[0:52]
to share a few words,
[0:53]
if you'd like.
[0:55]
Thank you very much, Vice
[0:56]
Chair, President Aramayo
[1:02]
for allowing me a few minutes
[1:03]
to introduce myself.
[1:05]
Many people in...
[1:06]
the significant part
[1:11]
of my career started here.
[1:14]
Honor.
[1:19]
But first, I'd like to thank
[1:20]
the mayor for having the trust
[1:23]
to appoint me. It is not
[1:27]
something that I sought, it
[1:29]
sought me, but I look forward
[1:33]
to working with,
[1:35]
learning from the public, this
[1:37]
is a different vantage point
[1:40]
for where my background, you
[1:43]
may not know, but I started my
[1:47]
career as a civil rights
[1:48]
attorney.
[1:50]
I thought that would be all
[1:52]
that I would do.
[1:54]
I loved working with civil
[1:55]
rights issues. Access the
[1:57]
opportunity that led
[2:01]
to legislative counsel for the
[2:02]
DC public schools were
[2:05]
educational policy and
[2:06]
budgetary issues and
[2:09]
through the quality
[2:10]
of education for Urban children
[2:13]
which led to me joining Marriott
[2:16]
Corporation on behalf
[2:18]
of the DC...
[2:21]
to develop a career academy
[2:22]
for those kids who are not
[2:24]
going to be going college,
[2:25]
to a career that would lead
[2:27]
to opportunities
[2:29]
in the hospitality industry.
[2:31]
It led me to actually go
[2:32]
to work for Marriott
[2:33]
to develop their first
[2:34]
National Minority Purchasing
[2:36]
Program and will seem
[2:38]
like desperate jobs, but
[2:40]
for me, there was a consistent
[2:42]
line that was creating
[2:43]
opportunity for those who don't
[2:46]
have our opportunities at a
[2:50]
better future. The mission at
[2:57]
Marriott, Marriott ended up
[2:58]
buying that
[3:00]
time Host International which
[3:01]
was the largest concession in
[3:05]
the US at the time.
[3:07]
That led to me moving from DC
[3:10]
to Santa Monica where I became
[3:12]
an adult at national response
[3:16]
major airports. The first in the
[3:18]
country.
[3:20]
I left Marriott, I left host
[3:22]
to join Aramark, president
[3:25]
of a division where I ran
[3:27]
business in their
[3:28]
K-12 and their college training
[3:30]
program which led me
[3:33]
to starting my own company...
[3:36]
...Inc., based here in Los
[3:38]
Angeles. 1996 we
[3:40]
actually opened on Dr.
[3:41]
Kingsburg of 1996, I mean
[3:46]
January 6, 15, 1996, small
[3:51]
facility
[3:52]
on Bradley facility. We grew
[3:55]
that business from one
[3:56]
location to 50 locations in nine
[3:59]
airports. That's because LAX
[4:01]
gave me an opportunity. I
[4:04]
learned a business really here
[4:06]
at LAX.
[4:07]
I learned a lot of things here
[4:08]
at LAX and I hope that many of
[4:11]
those learnings served me well
[4:13]
as a commissioner.
[4:14]
However, that was then and this
[4:17]
is now.
[4:18]
I realize my era at LAX
[4:22]
standpoint
[4:23]
of being an advocate sitting
[4:24]
out where you sit is very
[4:25]
different now in the role that
[4:27]
I will play as a commissioner.
[4:28]
I have to have a much broader
[4:30]
perspective.
[4:31]
I have to realize all
[4:32]
of the various stakeholders,
[4:34]
starting with the people,
[4:35]
starting with the airlines,
[4:36]
starting with all the people
[4:38]
who make this airport such.
[4:39]
I want to thank commissioners
[4:42]
for their warm welcome.
[4:44]
I've got a lot
[4:45]
to learn.
[4:46]
I plan to be a good team
[4:47]
member.
[4:48]
I plan to lean on my other
[4:49]
commissioners
[4:50]
to learn.
[4:51]
I plan to work with this great
[4:52]
staff to continue
[4:53]
to make LAX a great airport.
[4:54]
So, Vice Chair, Maya,
[4:58]
Aramaya.
[5:00]
Forgive me if I said it
[5:01]
incorrectly.
[5:02]
Thank you for the opportunity
[5:03]
to say a few words.
[5:04]
And, Commissioners, thank you
[5:05]
for your warm welcome.
[5:06]
Thank you.
[5:13]
The Board will now hold its
[5:14]
annual election
[5:15]
of officers pursuant to City
[5:16]
Charter Section 503A.
[5:19]
Could we please hear
[5:20]
nominations for the position
[5:21]
of President?
[5:23]
I will make a motion.
[5:24]
Thank you.
[5:25]
Thank you, Commissioner
[5:26]
La Bau.
[5:27]
I'll second it.
[5:28]
Thank you.
[5:29]
A second from Commissioner
[5:30]
Roxborough.
[5:32]
Are there further nominations
[5:33]
for that position?
[5:35]
Did you nominate Matt
[5:36]
Johnson?
[5:37]
Yeah, Matt Johnson.
[5:38]
Thank you.
[5:39]
I wanted to make sure.
[5:42]
Hearing no other nominations,
[5:43]
could I please have a motion
[5:45]
to approve President Matt
[5:48]
Johnson?
[5:50]
I will make the motion, yes.
[5:51]
Thank you, Commissioner
[5:52]
La Bau.
[5:53]
Second?
[5:54]
Second.
[5:55]
Thank you, Commissioner
[5:56]
Roxborough.
[5:57]
All those in favor,
[5:58]
please say aye.
[5:59]
Aye.
[6:00]
Any opposed?
[6:02]
The ayes have it.
[6:05]
I'd now like
[6:06]
to take nominations
[6:07]
for the position
[6:08]
of vice president.
[6:10]
I would like
[6:11]
to nominate the awesome
[6:13]
Vanessa Aramayo.
[6:16]
Second.
[6:17]
Thank you, Commissioner
[6:18]
Narro, and thank you,
[6:19]
Commissioner Velasco.
[6:20]
Are there any further
[6:21]
nominations
[6:22]
for that position?
[6:24]
Hearing none, I have a motion
[6:25]
to approve the nomination
[6:29]
from Commissioner...
[6:32]
I'll make that motion.
[6:33]
...Narro, thank you,
[6:34]
and the second from
[6:35]
Commissioner Velasco. All those
[6:38]
in favor, please say aye.
[6:39]
Aye.
[6:40]
Any opposed?
[6:42]
The ayes have it.
[6:43]
Thank you very much,
[6:44]
Commissioners,
[6:45]
for your trust.
[6:46]
I look forward to continuing
[6:48]
to work alongside you and the
[6:50]
Los Angeles World Airport.
[6:53]
In President Johnson's absence,
[6:54]
I will provide the opening
[6:56]
remarks and chair today's
[6:57]
meeting.
[7:00]
Earlier this morning, several
[7:01]
commissioners joined members of
[7:02]
the LAWA team and our airline
[7:04]
partners for this year's LAX
[7:05]
Fly Quieter Awards.
[7:07]
The Fly Quieter program, now
[7:09]
in its sixth year, is an
[7:11]
education and recognition
[7:12]
program designed to encourage
[7:14]
quieter airline operations
[7:15]
by commercial air carriers
[7:17]
at LAX.
[7:18]
Representatives from these
[7:19]
airlines who you were
[7:21]
recognized
[7:22]
at the ceremony this morning,
[7:23]
are here with us today.
[7:24]
And CEO Ackerman will go
[7:26]
into this in a bit
[7:27]
for more detail
[7:28]
during his management report.
[7:29]
But for now, I'd like
[7:30]
to invite the honorees to stand
[7:32]
and receive acknowledgement
[7:33]
for their efforts.
[7:44]
Congratulations again,
[7:45]
and thank you for your work.
[7:48]
When we last met,
[7:49]
a few short weeks ago, our city
[7:50]
and our airports were just
[7:52]
beginning to welcome the world
[7:53]
for the FIFA World Cup.
[7:55]
Today we are nearing the
[7:56]
conclusion
[7:57]
of the tournament here
[7:59]
in our city and I want
[8:00]
to thank, I want
[8:01]
to take a moment to recognize
[8:02]
the extraordinary effort that
[8:03]
has gone
[8:04]
into making this a success here
[8:05]
at the airport.
[8:07]
I want to thank the LAWA
[8:08]
team, our airline and airport
[8:10]
partners, the federal agencies,
[8:12]
the first responders,
[8:13]
volunteers,
[8:15]
and everyone who has worked
[8:16]
tirelessly and often
[8:17]
behind the scenes to ensure the
[8:19]
airports have remained safe,
[8:20]
secure, welcoming, and
[8:23]
efficient throughout the entire
[8:24]
tournament.
[8:26]
Your professionalism has been
[8:27]
on full display, and you have
[8:29]
represented both our airports
[8:30]
and our city exceptionally
[8:31]
well.
[8:33]
As visitors begin their
[8:34]
journeys home or
[8:35]
on the next round
[8:36]
of tournament
[8:37]
over the coming days,
[8:38]
we can all take pride in the
[8:39]
role our airports have played
[8:40]
in helping Los Angeles shine
[8:42]
on the world stage.
[8:46]
Moving on, just a few days ago
[8:48]
we also celebrated the 4th of
[8:49]
July.
[8:50]
While many of us had the
[8:51]
opportunity to spend time
[8:52]
with family and friends, we all
[8:54]
know that our airports never
[8:55]
close.
[8:56]
Holidays are often our busiest
[8:58]
travel periods and that means
[8:59]
thousands
[9:00]
of dedicated employees are
[9:01]
on the job.
[9:02]
Keeping operations running,
[9:04]
assisting passengers,
[9:05]
maintaining our facilities,
[9:07]
ensuring public safety,
[9:08]
and supporting every aspect
[9:09]
of airport operations.
[9:12]
To all our frontline employees
[9:13]
and airport partners who
[9:14]
worked...
[9:15]
through the holiday weekend,
[9:16]
thank you.
[9:18]
Your commitment and
[9:19]
professionalism allow millions
[9:20]
of travelers to safely reach
[9:21]
their destinations regardless
[9:23]
of the day on the calendar.
[9:26]
Finally, I'd like
[9:27]
to acknowledge that President
[9:29]
Johnson is not
[9:30]
with us today due
[9:31]
to a recent and unexpected loss
[9:33]
in his family.
[9:35]
Our hearts are
[9:36]
with him and his loved ones
[9:37]
during this extremely difficult
[9:38]
time.
[9:39]
On behalf of the Board of
[9:40]
Airport Commissioners and
[9:41]
everyone at LAWA, we extend our
[9:43]
deepest condolences and
[9:44]
support.
[9:45]
Please join me in observing a
[9:47]
brief moment of silence
[9:48]
for the Johnson family.
[9:59]
Thank you.
[10:07]
And now I'd like to move
[10:08]
to CEO Ackerman's management
[10:11]
report and update.
[10:12]
Mr. Ackerman?
[10:14]
Thank you very much, Vice
[10:15]
President Aramayo.
[10:17]
I'm going to start my update
[10:18]
with our key report indicators.
[10:20]
It's, again, a snapshot
[10:21]
of our performance at LAX and
[10:22]
VNY, in this case, May and
[10:24]
June.
[10:25]
Overall revenue is up 3%
[10:27]
compared to last year, with
[10:28]
parking revenue up strongly 4%.
[10:31]
Cargo continues
[10:32]
to perform well,
[10:33]
increasing 12% year
[10:35]
over year.
[10:36]
And our ASQ cleanliness scores
[10:38]
improved this month, reflecting
[10:39]
the dedication and the hard
[10:41]
work of our custodial team.
[10:42]
And as we reach the two-year
[10:43]
countdown
[10:44]
to the opening ceremony, again,
[10:45]
two years to the Olympics, we
[10:47]
continue to invest in the
[10:48]
people and preparations needed
[10:50]
to support this historic event.
[10:52]
Our ambassadors are working
[10:53]
to ensure our airports are
[10:54]
ready to welcome the world
[10:55]
every day.
[10:58]
As Vice President Aramayo
[10:59]
mentioned, this morning we
[11:00]
recognized representatives
[11:01]
from nine major airlines
[11:02]
at LAX for their efforts
[11:03]
to reduce noise
[11:04]
from aircraft operations as
[11:05]
part of LAWA's Fly Quieter
[11:06]
program.
[11:08]
You can see their logos up
[11:09]
on the screen.
[11:10]
These airlines are rated
[11:11]
in performance, rated
[11:12]
in accordance
[11:13]
with five scoring elements and
[11:15]
within three categories based
[11:16]
on the number
[11:17]
of average daily operations
[11:18]
at LAX.
[11:20]
The Fly Quieter program is also
[11:21]
the first commercial airport
[11:23]
fly quiet program in the nation
[11:24]
that allows airlines
[11:25]
to earn additional bonus points
[11:26]
for voluntarily using noise
[11:28]
mitigating technology on
[11:29]
aircraft and importantly
[11:32]
engaging with community and
[11:33]
stakeholders such as
[11:34]
participating in the LAX
[11:35]
Community Noise Roundtable.
[11:38]
We heard this morning that
[11:39]
because of the efforts
[11:40]
of a couple
[11:41]
of these airlines, we have had
[11:42]
airline representatives
[11:43]
at 100% of our community
[11:45]
meetings,
[11:46]
you know, talking to neighbors
[11:48]
about the impact they have and
[11:49]
explaining, you know,
[11:50]
from the airline and from an
[11:51]
actual pilot's perspective,
[11:52]
you know, what they're doing
[11:53]
to make less impact
[11:55]
on the neighbors.
[11:56]
So, we're really grateful to the
[11:57]
airlines that helped us get
[11:58]
to 100 percent this year.
[12:01]
As of July 1st, all critical
[12:03]
LAX facilities are powered
[12:05]
by receiving station X,
[12:07]
also known as RSX.
[12:09]
This project is a partnership
[12:11]
between LAWA and LADWP, and
[12:13]
it's been years and literally
[12:14]
years in the making.
[12:16]
And it's aimed at addressing
[12:17]
the persistent power
[12:18]
reliability, redundancy, and
[12:20]
capacity issues that we've
[12:21]
suffered for years at LAX.
[12:23]
And as a result
[12:24]
of this effort, we now have a
[12:25]
dedicated, state-of-the-art,
[12:26]
high-quality, reliable, and
[12:29]
resilient power system that has
[12:31]
sufficient capacity.
[12:32]
This project was completed
[12:34]
over several years, all without
[12:35]
serious injury or mishap.
[12:37]
And that's thanks
[12:38]
to the hundreds of LAWA, LADWP,
[12:40]
you know, city family
[12:41]
contractors and partners who
[12:42]
planned, engineered, and
[12:43]
constructed,
[12:45]
and commissioned this project.
[12:46]
And if I'm not mistaken, this
[12:47]
is the first receiving station
[12:49]
that has been built in Los
[12:51]
Angeles in more than 30 years.
[12:53]
We were with very senior DWP
[12:55]
leaders a few months ago
[12:57]
at the facility,
[12:58]
and they had been
[13:00]
at the agency
[13:02]
for more than three decades,
[13:03]
and this is the first receiving
[13:04]
station that they had seen.
[13:06]
So we're proud
[13:07]
to build it here.
[13:09]
World Cup festivities.
[13:11]
Commissioner Aramayo also
[13:12]
mentioned our vital role
[13:13]
in shaping the first impression
[13:15]
of the city for millions
[13:16]
of global visitors,
[13:17]
and in recognition
[13:18]
of the teamwork that went
[13:19]
into preparing for the 2026
[13:21]
World Cup, we provided select
[13:22]
employees the chance
[13:24]
to be a part
[13:25]
of the excitement firsthand.
[13:26]
Eligible employees were invited
[13:27]
to participate in a raffle
[13:28]
for exclusive World Cup
[13:29]
experiences,
[13:30]
including admission
[13:31]
to the official FIFA Fan
[13:32]
Festival at the Coliseum.
[13:34]
And additionally, our HR team
[13:36]
hosted a special celebration
[13:37]
for the World Cup World Round
[13:40]
32 watch party and our brand
[13:42]
new break room and patio area
[13:43]
on the fifth floor
[13:44]
of this building.
[13:45]
Members of Team LAWA enjoyed a
[13:46]
rooftop tailgate, snacks,
[13:49]
and got some of the matches on
[13:52]
big screen TVs and gave
[13:53]
everybody a front row feel.
[13:56]
And we deliberately purchased
[13:58]
tickets to this event and we
[13:59]
sent our employees because our
[14:01]
employees are what made us so
[14:03]
successful.
[14:04]
And what really made this
[14:05]
airport show so well as the
[14:07]
world came in.
[14:08]
So, we sent our own employees
[14:09]
to the event.
[14:12]
Last weekend, Team LAWA
[14:13]
celebrated America's 250th
[14:15]
birthday by marching
[14:16]
in the LAX Coastal Chamber of
[14:17]
Commerce Westchester Fourth
[14:19]
of July Parade.
[14:20]
LAWA entry featured the airport
[14:22]
affairs team along with LAX
[14:23]
Pups and the Airport Police's
[14:26]
Bearcat Motors Unit and Cadets.
[14:27]
The Greater San Fernando
[14:30]
Valley Chamber it Chambers
[14:32]
Hats Off Gala VNYs' Airport
[14:33]
was honored with the Captains
[14:35]
of Industry Aviation Award,
[14:37]
recognizing its leadership and
[14:38]
continued impact on the
[14:39]
region's aviation industry.
[14:41]
Its prestigious recognition
[14:43]
highlights VNYs' commitment
[14:44]
to operational excellence,
[14:46]
community partnership,
[14:47]
and its vital role
[14:48]
in supporting families in the
[14:49]
San Fernando Valley.
[14:51]
Congratulations to the entire
[14:53]
VNYs' team
[14:54]
on this well-deserved honor.
[14:57]
All while marked an exciting
[14:58]
milestone for the Airfield and
[15:00]
Terminal Modernization
[15:01]
Program, or ATMP as we lovingly
[15:03]
call it, with the completion
[15:05]
of the ATMP Showroom.
[15:06]
It's a new space designed to
[15:07]
showcase the vision and the
[15:09]
impact of this project
[15:10]
on the neighborhood.
[15:11]
Located next door at Skyview
[15:13]
South, the showroom serves as
[15:14]
an interactive hub where team
[15:16]
members, stakeholders, and
[15:17]
partners can explore how the
[15:18]
ATMP Roadway Improvements
[15:20]
Project is enhancing safety,
[15:22]
improving traffic flow,
[15:23]
and modernizing access
[15:24]
to LAX.
[15:26]
Drawing on project visuals,
[15:27]
displays, and storytelling, the
[15:29]
space highlights the scale and
[15:30]
significance of one of the
[15:31]
airport's most transformative
[15:33]
infrastructure efforts.
[15:35]
The project team is planning an
[15:36]
ATMP showroom community open
[15:38]
house later this month that
[15:39]
will allow guests to experience
[15:40]
the space and learn more about
[15:41]
the work shaping the future
[15:42]
of LAX.
[15:45]
Last month we welcomed 36 new
[15:47]
team members across various
[15:49]
divisions and groups and as
[15:50]
always if you see these faces
[15:51]
up on the screen around campus
[15:53]
please say hello.
[15:55]
I give them a warm welcome to
[15:56]
Team LAWA and as always, a shout
[15:59]
out
[16:00]
to the amazing LAWA HR team
[16:01]
for continuing to recruit high
[16:03]
quality teammates to join,
[16:06]
to join our efforts.
[16:07]
Thank you.
[16:08]
And speaking of high-quality
[16:10]
folks, in June, a total of 41
[16:12]
summer interns were hired and
[16:14]
placed in groups
[16:15]
across LAX and VNYs',
[16:16]
including Airport Development
[16:18]
Group, Airport Affairs,
[16:19]
Finance, Accounting, HR,
[16:20]
Operations and Maintenance,
[16:22]
Government Affairs, Badging,
[16:23]
APD, Guest Services, and more.
[16:26]
These talented students bring
[16:27]
fresh perspectives.
[16:28]
They bring enthusiasm
[16:30]
to LAWA.
[16:31]
They're going to have the
[16:32]
opportunity
[16:33]
to learn alongside some of the
[16:34]
industry's very best
[16:35]
professionals.
[16:39]
I want to close
[16:40]
on a bit of a sad note, I end my
[16:43]
report today with the news
[16:44]
of the recent passing
[16:45]
of two valued members
[16:46]
of our LAWA family.
[16:48]
Enrique Guerra and Rodney
[16:50]
Rigomaro. Mr. Guerra worked as
[16:52]
a custodian in Terminal 4
[16:54]
at the time of his passing. He
[16:56]
began his career with the city
[16:58]
of Los Angeles in January, 23.
[17:00]
He was laid to rest in his
[17:01]
home, home country of
[17:03]
Guatemala.
[17:04]
Mr. Rigomaro was an airport
[17:06]
superintendent
[17:07]
of operations and passed away
[17:08]
on June 30th.
[17:10]
He began his career with the
[17:11]
city is as a management
[17:12]
assistant
[17:13]
in the personnel department
[17:14]
in February of 1981.
[17:16]
Our thoughts are
[17:17]
with their colleagues,
[17:18]
friends and loved ones
[17:19]
during this difficult time.
[17:21]
And this concludes my CEO
[17:22]
update.
[17:24]
Thank you, Mr. Ackerman.
[17:25]
Are there any speakers
[17:26]
on this presentation?
[17:27]
There are no speakers
[17:28]
on this presentation.
[17:31]
Does any commissioner have any
[17:32]
questions
[17:33]
on the CEO's update?
[17:39]
If there are no further
[17:40]
questions or comments
[17:41]
from the Board, we will now
[17:42]
move to the next item
[17:43]
of business.
[17:45]
I'd like to invite
[17:46]
Commissioner La Bau to provide
[17:47]
a brief report regarding the
[17:49]
recent Security Committee
[17:50]
meeting held on June 18th.
[17:52]
Yes, thank you.
[17:54]
The Board Security Committee
[17:55]
meeting convened on Thursday,
[17:56]
June 18th, 2026,
[17:58]
to receive a briefing from
[17:59]
Deputy Executive Director of
[18:00]
Public Safety and Security,
[18:02]
Martin Elam, and our Airport
[18:04]
Chief of Police, Cecil
[18:05]
Rambo.
[18:07]
The briefing provided a
[18:08]
comprehensive overview
[18:09]
of the LAX Police Department's
[18:11]
public safety staffing
[18:12]
validation and the workforce
[18:14]
optimization assessment.
[18:16]
And some
[18:17]
of the things that we spoke
[18:18]
about were key assessment
[18:19]
findings, peer benchmarking
[18:21]
efforts, ongoing stakeholder
[18:23]
engagement,
[18:24]
and strategic planning
[18:25]
for the future direction
[18:26]
of LAX PD.
[18:29]
This briefing also included a
[18:31]
very important virtual
[18:32]
discussion addressing several
[18:33]
critical focus areas.
[18:35]
We spoke about the patrol
[18:37]
deployment strategies
[18:38]
for the airport,
[18:39]
workforce sustainability for
[18:41]
our police and security
[18:42]
professionals, the utilization
[18:44]
of civilian and security
[18:46]
personnel
[18:47]
in keeping our airport safe,
[18:48]
transit security readiness,
[18:50]
and alignment with aviation law
[18:52]
enforcement best practices
[18:54]
around the country.
[18:56]
The committee extends our
[18:57]
sincere appreciation as well
[18:59]
to the following individuals
[19:00]
for their contribution and
[19:01]
expertise in this.
[19:03]
Assistant Chief Mark Hamilton
[19:05]
from the Dallas-Fort Worth
[19:06]
Airport, Deputy Chief Timothy
[19:08]
Tyler from the Metropolitan
[19:09]
Washington Airports
[19:11]
Authority, which is Dulles and
[19:13]
Reagan, Mike Villa, Director
[19:15]
of Security and Emergency
[19:17]
Management, and Chief Sean
[19:18]
Guillabo from the Seattle
[19:20]
Airport, as well as Major
[19:21]
David Wilson from the Atlanta
[19:23]
Airport, and lastly, Kevin
[19:26]
Murphy, the Executive Director
[19:27]
of ALEEN, the Airport Law
[19:29]
Enforcement Agency's Network.
[19:31]
I'd really like
[19:32]
to also recognize Martin Elam
[19:35]
and Chief Cecil Rambo and their
[19:38]
respective teams
[19:39]
for their continued dedication
[19:41]
in maintaining airport safety
[19:43]
and security.
[19:44]
Thank you.
[19:45]
My report's concluded.
[19:48]
Thank you, Commissioner La
[19:49]
Bau.
[19:50]
Moving on to general public
[19:51]
comments,
[19:52]
for everyone's information,
[19:54]
as a courtesy and
[19:55]
for the first time, we will be
[19:56]
testing...
[19:57]
testing a live language
[19:59]
interpretation through
[20:00]
real-time translated text
[20:01]
displayed on the screen
[20:03]
during the meeting.
[20:05]
Please note that this is a
[20:06]
pilot program and the accuracy
[20:07]
of the real-time translated
[20:09]
text may vary.
[20:11]
This is the same information
[20:12]
that has been provided to all
[20:13]
the speakers here today.
[20:14]
Are there any speakers
[20:15]
on non-agenda items?
[20:18]
Madam Chair, we actually have
[20:19]
eight speakers
[20:22]
for general so far.
[20:24]
Thank you.
[20:25]
Would you please...
[20:29]
Call them up.
[20:31]
Thank you, Vice President,
[20:33]
Aramayo, at this time, could I
[20:35]
please request the following
[20:36]
speakers to please line up
[20:39]
by the windows
[20:40]
in the order I call
[20:41]
out your name.
[20:44]
Steve Bills, Jason Irani,
[20:50]
Marina Zamora, and Maria
[20:54]
Lorena Herrera.
[20:57]
Now as they come up, I will add
[20:59]
as a reminder that general
[21:00]
public comments must be related
[21:02]
to Los Angeles World Airport
[21:03]
business.
[21:08]
Could you please tell me again
[21:10]
how many speakers we have?
[21:14]
And let us give each speaker
[21:15]
one minute.
[21:21]
When your name is called again,
[21:22]
please come forward
[21:23]
to the lectern, speak directly
[21:24]
into the microphone and state
[21:25]
your name.
[21:27]
Before you begin your comments,
[21:30]
Steve Bills, please go
[21:33]
to the lectern, state your
[21:34]
name,
[21:35]
and provide your comments.
[21:39]
Good morning, Commissioners.
[21:40]
My name is Steve Bills.
[21:41]
I am here on behalf of the
[21:42]
workers testing the APM system.
[21:45]
I am the business agent
[21:46]
for IUEC Local 18, the union
[21:48]
that represents these workers.
[21:50]
For years, these highly skilled
[21:52]
workers have been testing this
[21:53]
train for Alstom
[21:55]
while receiving wages and
[21:57]
benefits well
[21:58]
below the prevailing rates.
[21:59]
Rather than strike, these
[22:01]
workers followed the project
[22:02]
labor agreement and pursued
[22:04]
their claims through the
[22:05]
grievance and arbitration
[22:06]
process at significant expense
[22:09]
to the union.
[22:10]
The arbitrator found that
[22:12]
Alstom and Links has failed to
[22:14]
pay the wages and benefits
[22:15]
required by the PLA.
[22:17]
Alstom has since refused
[22:19]
to comply with the arbitration
[22:21]
decision and has shamefully
[22:23]
refused
[22:24]
to pay the arbitrator's fee.
[22:27]
Now, Alstom has sued the union
[22:29]
and is asking the court to
[22:32]
invalidate the very dispute
[22:33]
resolution process established
[22:35]
under the PLA.
[22:37]
Instead of paying wages and
[22:39]
benefits these workers earned,
[22:41]
Alstom is forcing the union.
[22:43]
Thank you.
[22:44]
Thank you.
[22:47]
Jason Eroni, please go to the
[22:50]
lector and state your name and
[22:52]
provide your comments.
[22:54]
Hi, good morning, Jason
[22:55]
Eroni.
[22:56]
I was a...
[22:57]
I was a bidder on a bid that
[23:00]
was out in February.
[23:01]
I was the lowest bidder
[23:03]
by a factor of three
[23:04]
from the next one.
[23:06]
I was found to be
[23:07]
non-responsive.
[23:08]
I protested it.
[23:09]
The protest, as you can see
[23:10]
with the paperwork that you
[23:11]
have on you, the LAWA letter,
[23:13]
the protest did not go
[23:15]
anywhere.
[23:16]
LAWA says it was duly received
[23:18]
and remains on record, but
[23:19]
there should be a binary
[23:20]
response to that, either upheld
[23:22]
or rejected.
[23:24]
LAWA then went ahead and
[23:25]
flip-flopped and they accepted
[23:26]
us as responsive
[23:28]
in the letter. As you can see
[23:29]
and highlighted, but they went
[23:30]
to do a novel approach and they
[23:32]
said we're gonna split. We're
[23:33]
gonna cherry pick the line
[23:34]
items
[23:35]
from your bid. The lowest bid
[23:37]
in the next bidder up,
[23:38]
which is completely not in line
[23:40]
and they referenced some City
[23:43]
of Los Angeles Charters.
[23:45]
I included in the letter.
[23:46]
There is no Charter, it, there's
[23:49]
no rule that says you can split
[23:50]
a bid.
[23:51]
Nobody would bid such a thing.
[23:52]
You're going to get this item
[23:54]
for approval next month.
[23:56]
Please take a look at it.
[23:57]
I'll probably be here again
[23:58]
to talk about that then.
[23:59]
Thank you very much.
[24:00]
Thank you.
[24:03]
Marina Zambora, please go
[24:05]
to the lectern, state your
[24:07]
name,
[24:08]
and provide your comments.
[24:16]
Buenos d?as para todos,
[24:18]
comisionados.
[24:20]
Mi nombre es Marina Zamora y
[24:21]
trabajo en Flying Food Group.
[24:26]
I'm sorry, no translation?
[24:28]
La traducci?n...
[24:30]
The translation is
[24:31]
on the screen.
[24:32]
Oh, that's okay.
[24:33]
It's in the screen.
[24:34]
Esta en la pantalla.
[24:35]
Thank you. Gracias.
[24:36]
Want her time restarted?
[24:37]
Yes, please restart her time.
[24:40]
En el ?rea de alimentos fr?os,
[24:41]
estoy aqu? porque nos
[24:44]
enfrentamos a
[24:45]
condiciones de seguridad
[24:47]
aterradoras en el trabajo.
[24:50]
OSHA ya ha emitido m?ltiples
[24:53]
multas contra Flying Food
[24:55]
Group,
[24:56]
por fallas cr?ticas de
[24:59]
seguridad, incluyendo cerrar
[25:00]
una puerta de salida con llave
[25:03]
desde el exterior durante una
[25:05]
l?nea de protesta planificada
[25:08]
por los trabajadores, y tener
[25:12]
cuartos fr?os que no se abr?an
[25:14]
desde adentro.
[25:21]
Todo empeor? aun m?s el 22 de
[25:24]
enero de 2026, cuando estall?
[25:27]
un incendio y dos de mis
[25:30]
compa?eros de trabajo se
[25:34]
quedaron atrapados dentro de un
[25:36]
cuarto fr?o cerrado con llave.
[25:39]
Nos hemos presentado ante LAWA
[25:41]
y hemos testificado 50 veces
[25:44]
sobre esto.
[25:45]
Thank you.
[25:46]
Muchas gracias.
[25:47]
I'm sorry.
[25:48]
Thank you.
[25:50]
Before I call the next speaker,
[25:53]
can I please request the
[25:54]
following set of speakers to
[25:56]
please line up by the windows
[25:57]
in the order I call
[25:59]
out your name.
[26:02]
Kenya Nazario, Estela Ruiz,
[26:07]
Alvaro Suarez, and Esperanza
[26:11]
Maciel.
[26:15]
Maria Lorena Barrera, please
[26:17]
step up to the lectern,
[26:19]
state your name,
[26:20]
and provide your comments.
[26:21]
Thank you.
[26:24]
Gracias.
[26:25]
Buenos d?as a todos.
[26:27]
Mi nombre es Lorena Barrera y
[26:30]
trabajo en el ?rea de comida
[26:32]
friar en Flying Fruit Group.
[26:36]
Las violaciones de Flying
[26:38]
Fruit Group son repetidas.
[26:44]
Se extiende desde el robo de
[26:46]
salario,
[26:47]
severas violaciones de
[26:51]
seguridad,
[26:53]
OSHA violaciones de la
[26:57]
seguridad p?blica, del CHP,
[27:01]
hasta represalias ilegales.
[27:04]
Esta compa?a ha probado que no
[27:07]
respeta ni la ley, ni los
[27:10]
trabajos, ni a los
[27:13]
trabajadores, que hemos dado
[27:20]
evidencias de puertas
[27:23]
en llevadas durante incendios,
[27:25]
sueldos robados,
[27:27]
y represalias ilegales.
[27:29]
Gracias.
[27:34]
Kenya Nazario, please go to the
[27:36]
lectern and please speak
[27:38]
directly into the microphone so
[27:40]
everyone can hear you,
[27:41]
state your name,
[27:42]
and provide your comments,
[27:44]
please.
[27:45]
Muy buenos d?as.
[27:46]
Mi nombre es Kenya Nazario.
[27:47]
Gracias por darnos la
[27:49]
oportunidad de estar aqu? y
[27:50]
poder...
[27:51]
decir realmente lo que es.
[27:53]
El d?a de hoy estamos un grupo
[27:55]
de empleados de Flying Food
[27:56]
Group.
[27:57]
Trabajo en el ?rea del equipo
[27:58]
por m?s de tres a?os.
[28:01]
Una vez m?s, vinimos para dar a
[28:04]
conocer la verdad.
[28:07]
No necesito nada escrito porque
[28:10]
considero que cuando t? no
[28:11]
mientes,
[28:13]
no necesitas recordar nada.
[28:15]
Nosotros nos sentimos bien y a
[28:17]
la misma vez tristes por saber
[28:18]
que solo tenemos seis meses de
[28:21]
prueba.
[28:24]
En los otros a?os anteriores,
[28:25]
la empresa no ha tenido estos
[28:26]
incidentes.
[28:27]
Algo extra?o que ahora est?
[28:28]
sucediendo, cuando siempre ha
[28:31]
sido una buena empresa.
[28:33]
Y mientras te hace ver a
[28:35]
compa?eros que hablan mal y le
[28:37]
muerden la mano a quien le da
[28:38]
de comer.
[28:39]
Ok, creo en Dios y creo que
[28:41]
ustedes van a tomar una buena
[28:42]
decisi?n sobre la empresa.
[28:44]
Gracias.
[28:47]
Next.
[28:48]
Estela Ruiz, please go
[28:51]
to the lectern, speak directly
[28:53]
into the mic, state your name,
[28:54]
and provide your comments.
[28:57]
Estela Ruiz.
[29:02]
Next speaker, Alvaro Suarez,
[29:06]
please go to the lectern.
[29:12]
Muy buenos d?as a cada uno de
[29:14]
las personas que se encuentran
[29:15]
ac?, hoy d?a, ac?.
[29:16]
Mi nombre es ?lvaro Su?rez,
[29:18]
trabajo para Cold Food.
[29:20]
El motivo hoy d?a de estar ac?
[29:21]
es porque realmente me siento
[29:24]
bastante preocupado, porque,
[29:28]
o pienso que bastante desleal,
[29:30]
verdad, lo se le ha hecho en la
[29:32]
compa?a con eso de que quieren
[29:35]
quitarles el permiso para poder
[29:36]
entrar al aeropuerto.
[29:38]
Y siento que detr?s de los m?s
[29:40]
de 600 empleados que nos
[29:42]
podr?amos quedar sin trabajo,
[29:44]
hay 600 familias que tambi?n
[29:46]
pod?an padecer de hambre y de
[29:47]
muchas cosas. Porque entendamos
[29:49]
que detr?s de cada uno de
[29:50]
nosotros est? el sustento de
[29:51]
nuestras familias. Gracias
[29:55]
Thank you.
[29:56]
Esperanza Maciel.
[30:04]
Buenos d?as.
[30:05]
Mi nombre es Esperanza
[30:06]
Maciel.
[30:07]
Yo trabajo para la compa?a
[30:08]
Flying Food.
[30:10]
M?s de 10 a?os.
[30:11]
Excuse me,
[30:12]
can you please talk closely
[30:13]
to the mic?
[30:15]
M?s de 10 a?os tengo trabajando
[30:16]
para la empresa.
[30:17]
Me siento muy contenta,
[30:18]
muy orgullosa de trabajar ah?.
[30:20]
En mi vida, desde que llegu? a
[30:22]
este pa?s, he prosperado.
[30:25]
No tengo ninguna queja.
[30:27]
No siento que haya alguna
[30:28]
amenaza de trabajo.
[30:31]
Se ha hecho lo que todas las
[30:33]
empresas han hecho.
[30:34]
Vienen muchos compa?eros como
[30:36]
yo a decir lo que les puede
[30:39]
afectar si este este trabajo se
[30:42]
cierra. Nosotros hemos usado
[30:44]
estas camisetas y nos hemos
[30:46]
unido porque estamos en mismo
[30:49]
acuerdo en que necesitamos este
[30:50]
trabajo.
[30:51]
Que mucha gente lo necesita.
[30:52]
Hay gente de 10, de 20, de 22
[30:55]
a?os trabajando para esta
[30:56]
empresa.
[30:57]
No hay nada malo,
[30:58]
nada que no se pueda arreglar.
[31:01]
Yo trabajo todos los d?as en el
[31:04]
piso.
[31:06]
Gracias.
[31:07]
Thank you very much.
[31:10]
Estela Ruiz.
[31:15]
That's it.
[31:21]
Oh.
[31:22]
Madam Chair, those are all the
[31:23]
speakers for public comments.
[31:24]
Thank you.
[31:25]
Thank you.
[31:26]
Are there any neighborhood
[31:27]
council speakers today?
[31:28]
There are none.
[31:30]
Moving on to the approval
[31:31]
of minutes,
[31:32]
could I please have a motion
[31:33]
to approve the minutes
[31:34]
for the June 18, 2026 special
[31:35]
meeting?
[31:36]
So moved.
[31:37]
Second.
[31:38]
Thank you, Commissioners
[31:39]
Roxborough and Commissioner
[31:40]
La Bau.
[31:41]
All those in favor say aye.
[31:43]
Aye.
[31:45]
Any opposed say no.
[31:48]
And any abstentions?
[31:50]
Yes.
[31:54]
Commissioner Daniel stepped
[31:55]
out so he's going to be absent
[31:57]
on this item.
[31:59]
Very good.
[32:01]
Moving on
[32:03]
to the consent items.
[32:04]
Commissioners, item 5 regarding
[32:05]
the Second Amendment to the
[32:06]
Concession Agreement with first
[32:08]
class vending will be pulled
[32:09]
off today's agenda and item 11
[32:11]
regarding the FAA grant will be
[32:12]
pulled from the consent list
[32:14]
to allow staff
[32:15]
to provide a presentation
[32:16]
on that item.
[32:18]
In addition to those,
[32:19]
does any Commissioner want
[32:20]
to pull an item
[32:21]
for discussion?
[32:28]
As a reminder,
[32:29]
if there are speakers
[32:30]
on any consent item,
[32:31]
that item will be pulled from
[32:32]
the consent list so we can hear
[32:33]
from the speakers.
[32:34]
Could the Board Secretary
[32:35]
please advise if there are
[32:37]
speakers on any of the consent
[32:38]
items?
[32:39]
There are none.
[32:41]
Very good.
[32:45]
With the aforementioned items
[32:46]
pulled...
[32:47]
We have left items number 1,
[32:50]
2, 3, 6, 7, 9, and 10.
[32:57]
Right.
[32:58]
1, 2, 3, 4.
[33:03]
1, 2, 3, 4, 6, 7, 8, 9, and
[33:08]
10.
[33:09]
And 11.
[33:11]
11 was pulled.
[33:14]
It's pulled for...
[33:16]
...presentation.
[33:21]
Could I have a motion to approve
[33:22]
those consent items.
[33:25]
Second.
[33:26]
Thank you commissioners
[33:27]
Roxborough and La Bau. All those
[33:29]
in favor say aye.
[33:30]
Aye.
[33:32]
All those
[33:33]
opposed no. Those consent items
[33:34]
are approved. Commissioners let
[33:39]
us again hold our questions
[33:41]
until after the staff reports
[33:43]
for the next section. We are now
[33:46]
on item number 12.
[33:51]
Mr. J?
[33:52]
No?
[33:53]
11.
[33:54]
11, excuse me.
[33:55]
Lead in.
[33:56]
Number 11, could I please have
[33:57]
Mr.
[33:58]
Doug Webster?
[33:59]
Thank you.
[34:03]
Very good.
[34:04]
Good morning, Commissioners.
[34:05]
Doug Webster.
[34:06]
I'm the Chief Operations and
[34:07]
Maintenance Officer.
[34:08]
This morning, for item number 11
[34:10]
it's being presented to
[34:11]
accept a grant offer from
[34:13]
the FAA to
[34:14]
support and enhance our vehicle
[34:15]
movement area transponder
[34:17]
network at Los Angeles
[34:18]
International Airport in
[34:19]
VNYs.
[34:21]
We desire to provide you
[34:22]
with some context as
[34:23]
to what the grant will achieve
[34:25]
to enhance safety
[34:26]
at our airports.
[34:28]
I have asked Neil Weingarten,
[34:29]
our director
[34:30]
of airport operations,
[34:31]
to walk you
[34:32]
through a quick overview of
[34:33]
what this grant will achieve.
[34:40]
Good morning, thank you.
[34:43]
So a quick overview
[34:44]
of what the VMATs do.
[34:46]
These are Vehicle Movement
[34:47]
Area Transponders.
[34:49]
They utilize the system called
[34:50]
ADS-B, which is Automatic
[34:53]
Dependent Surveillance
[34:54]
Broadcast, which is a really
[34:55]
fancy term,
[34:57]
but if you've ever used
[34:59]
FlightAware or FlightRadar24,
[35:01]
this data actually comes
[35:03]
from the same place.
[35:04]
The difference is we're
[35:05]
installing it in vehicles
[35:06]
on the airfield to give us
[35:07]
situational awareness and
[35:09]
to aid in the insurance
[35:11]
of no vehicle collisions
[35:13]
on the airfield.
[35:15]
They provide a highly precise
[35:17]
real-time location information
[35:19]
and situational awareness.
[35:21]
They're viewable in the tower
[35:23]
through ASDX is what we call it,
[35:25]
but it stands for Airport
[35:27]
Surveillance Detection
[35:28]
Equipment and Model X.
[35:30]
It basically merges data
[35:32]
from multiple sources.
[35:34]
It takes the ADS-B data,
[35:36]
it takes ground radar,
[35:38]
it takes satellite information,
[35:42]
and puts it all together so the
[35:43]
tower can actually see all the
[35:44]
vehicles on the airfield along
[35:46]
with the aircraft.
[35:47]
The ARC also uses this
[35:48]
with a subscription called
[35:49]
Aerobon.
[35:55]
So the VMATs at LAX are
[35:57]
different.
[35:58]
We've got two different types.
[35:59]
We have an older version and a
[36:00]
newer version.
[36:01]
The older version is quite
[36:02]
interesting.
[36:04]
At the time that airlines and
[36:05]
airports started using VMAT,
[36:07]
there was no actual device
[36:09]
to put on vehicles.
[36:11]
They were all aircraft devices.
[36:13]
So what the FAA allowed
[36:14]
for was a modification of a
[36:17]
general aviation transponder.
[36:19]
It's the same device you would
[36:20]
see in a Cessna 172, just
[36:22]
modified for ground use.
[36:24]
Currently there's been an
[36:25]
upgrade to the system.
[36:27]
We now have the VTU20,
[36:29]
which if you see
[36:30]
on the slide there,
[36:31]
it looks a lot like a Sirius XM
[36:33]
antenna.
[36:35]
A lot different than the box
[36:36]
you see on the older model.
[36:38]
Currently out of the 104 we
[36:40]
have in LAX, currently 80 units
[36:42]
are the older type and 24 are
[36:45]
the newer type.
[36:50]
This is a breakdown
[36:51]
of the vehicles in LAX that
[36:53]
actually have VMATs installed.
[36:55]
41 for operations, 31
[36:57]
for bus ops, 21
[36:59]
for maintenance, and 11
[37:01]
for our vehicles.
[37:04]
Currently, 76%
[37:05]
of the coverage is actually
[37:07]
on operations and buses.
[37:12]
In VNYs, the same grant
[37:13]
that we're speaking of today,
[37:15]
we have the opportunity
[37:16]
to install VMATs
[37:18]
on our equipment
[37:19]
for the first time.
[37:20]
It's very rare that a general
[37:21]
aviation airport will have VMAT
[37:23]
capability.
[37:24]
The FAA has actually installed
[37:26]
Aerobon throughout the airport,
[37:28]
which is something we use
[37:29]
in the ARC, to allow
[37:31]
for this type of device to be
[37:33]
installed and have situational
[37:34]
awareness in the tower.
[37:36]
The current plan in front
[37:37]
of you is for eight vehicles
[37:40]
for airport ops, 17
[37:41]
for maintenance, 3 for
[37:43]
admin and community relations,
[37:45]
9 for LAFD, and 12
[37:47]
for airport police.
[37:55]
So, this item, as you can see
[37:57]
from an AIP grant funding, it
[37:59]
will provide 75% reimbursement
[38:01]
at LAX.
[38:02]
It will provide 95%
[38:03]
reimbursement for VNY, up
[38:05]
to $500,000 per airport.
[38:07]
So, it's a substantial grant
[38:08]
from that perspective.
[38:09]
LAWA was applied for this
[38:11]
funding and expect that we will
[38:13]
receive approval
[38:14]
of this request.
[38:16]
We're currently negotiating an
[38:18]
agreement relative
[38:19]
to the equipment provider
[38:21]
to actually do the procurement,
[38:22]
and that will be forthcoming
[38:23]
in the future.
[38:24]
So at this time we would
[38:25]
request adoption
[38:26]
of the staff report and
[38:27]
approval of the item and we
[38:29]
would be happy to answer any
[38:30]
additional questions you might
[38:31]
have about the system.
[38:33]
Thank you both.
[38:34]
Are there any speakers
[38:35]
on this item?
[38:36]
Hang on.
[38:39]
Any questions or comments
[38:40]
from the board?
[38:42]
Just one question.
[38:43]
Assuming everything gets
[38:44]
approved, how long before the
[38:46]
equipment is received and
[38:49]
packed?
[38:50]
As an example, at LAX we
[38:51]
already have the equipment
[38:52]
in place, we're just doing
[38:53]
upgrades,
[38:54]
so that's a good thing.
[38:55]
We're probably looking
[38:56]
somewhere in the range of
[38:57]
about six months
[38:58]
until we'll be able
[38:59]
to do the upgrade
[39:00]
from that perspective,
[39:01]
but we're trying to move that
[39:02]
along as quickly as possible.
[39:03]
But we are excited
[39:04]
to get this grant opportunity.
[39:05]
That's terrific.
[39:06]
Thank you.
[39:07]
But it's not
[39:08]
on every single vehicle,
[39:09]
obviously.
[39:10]
No.
[39:11]
And there's no move
[39:12]
to do that.
[39:13]
No.
[39:14]
To get the situational
[39:15]
awareness on a couple
[39:16]
of vehicles
[39:17]
from each department,
[39:18]
basically.
[39:19]
So, the focus on this is that we
[39:20]
want to get the vehicles that
[39:21]
physically go into what's
[39:22]
called the movement area.
[39:23]
So that is the controlled
[39:24]
portion of the airport.
[39:25]
And the concern would be if you
[39:26]
put them on all the vehicles,
[39:27]
you would have clutter all
[39:28]
over the screen.
[39:29]
So you wouldn't be able to
[39:30]
discern what are the important
[39:31]
vehicles and the ones that are
[39:32]
just routinely operating
[39:33]
in the non-movement area of the
[39:34]
airport.
[39:35]
How does it work
[39:36]
with the vehicles?
[39:38]
If there's a vehicle that,
[39:39]
two vehicles that are close
[39:40]
to each other,
[39:41]
are transmissions able
[39:42]
to do so they know they're
[39:43]
close to each other?
[39:44]
So potentially
[39:45]
in the future it'll be able
[39:46]
to do that, because there's
[39:47]
out and in relative
[39:49]
to ADS-B transmissions.
[39:52]
This right now,
[39:53]
primarily what it's going
[39:54]
to be able to do is make it so
[39:55]
the tower is able to see
[39:56]
exactly where every vehicle
[39:58]
that is critical,
[39:59]
that would be going out
[40:00]
on the movement area,
[40:01]
is located.
[40:03]
And so ultimately, you know,
[40:05]
if you have any type
[40:06]
of incursion or something
[40:07]
along those lines, it gives the
[40:08]
tower specifically more greater
[40:10]
awareness.
[40:11]
In the future,
[40:12]
there's the potential that we
[40:13]
may be able
[40:14]
to go ahead and do the
[40:15]
out and in,
[40:16]
which then would begin to let
[40:17]
vehicles and airplanes see each
[40:18]
other.
[40:19]
But that is down the road
[40:20]
still.
[40:23]
Commissioners, I would say this
[40:24]
is.
[40:25]
If you recall the tragedy in
[40:26]
New York recently,
[40:27]
they didn't have this system
[40:29]
on some of that equipment,
[40:30]
and it didn't allow the tower
[40:31]
to see exactly what was going
[40:32]
on.
[40:33]
There was multiple, you know,
[40:34]
probably factors in that
[40:35]
accident,
[40:36]
but this was one of them. And
[40:38]
we're well ahead of most
[40:39]
of our airport peers on this.
[40:40]
We are trying to stay further
[40:42]
and this is a very good move
[40:44]
for the airport.
[40:45]
And again, as Doug said, no
[40:47]
other general aviation airport
[40:48]
in the country, really, will
[40:50]
have the same capability that
[40:51]
we will have at VNY. We
[40:52]
are also proud that we will
[40:53]
make this investment at VNY,
[40:56]
not just at LAX.
[40:59]
Any other questions or comments
[41:00]
from the Commission?
[41:03]
If there are none,
[41:04]
could I have a motion
[41:05]
to approve item 11?
[41:06]
So moved.
[41:07]
Second.
[41:08]
Thank you, Commissioners
[41:09]
Velasco and Roxborough.
[41:11]
All those in favor, say aye.
[41:12]
Aye.
[41:13]
Any opposed?
[41:15]
The ayes have it.
[41:20]
We are now on item number 12,
[41:23]
Mr.
[41:24]
Jacob Adams.
[41:25]
Good morning, Vice President
[41:26]
Aramayo.
[41:27]
Good morning
[41:28]
Commissioners and welcome
[41:30]
Commissioner Daniels.
[41:31]
Glad to see you here.
[41:34]
Yeah, so I wanted to take just
[41:35]
a quick second and introduce
[41:37]
you guys to one of our
[41:39]
superstar LAWA engineers.
[41:42]
Laurel, come on up.
[41:44]
This is Laurel Soriano, and he
[41:46]
is actually the project manager
[41:48]
for the project that's being
[41:50]
considered before you today.
[41:51]
So, I'm going to turn it over
[41:52]
to him, and he's going to go
[41:53]
through a presentation
[41:54]
with you guys,
[41:55]
and then he's going to answer
[41:56]
any questions you might have.
[42:05]
Alright.
[42:07]
Good morning, Vice President
[42:08]
Aramayo, Commissioners.
[42:11]
As Jake mentioned, my name is
[42:12]
Laurel Suriano.
[42:14]
I'm the Project Manager
[42:15]
for the Airport Development
[42:16]
Program.
[42:19]
And today we're recommending
[42:21]
the award
[42:22]
for a three-year contract for
[42:23]
Sully Miller Contracting
[42:24]
Company.
[42:25]
And we're approving, waiting for
[42:26]
the approving of the
[42:27]
appropriation
[42:28]
of the $108,383,603 for the
[42:33]
Taxiway Alpha West and
[42:34]
Foxtrot
[42:36]
Reconstruction Project.
[42:39]
Just
[42:40]
to give you guys an overview of
[42:41]
where the project is located,
[42:43]
as you can see,
[42:45]
basically that this is located
[42:47]
on the south complex of the
[42:50]
airfield where we will be
[42:52]
reconstructing the Taxiway
[42:53]
Alpha on the west side
[42:55]
from Taxiway Quebec
[42:57]
to Taxiway Alpha 7 and
[42:58]
on the east side, Taxiway
[43:01]
Foxtrot between runway 7L25
[43:03]
right and 7R25 left,
[43:05]
including airport improvements
[43:07]
on the intersection of Alpha
[43:09]
and Foxtrot.
[43:12]
Now these taxiways are critical
[43:14]
to the cargo area operations.
[43:17]
And one of the challenges that
[43:18]
we've had is maintaining the
[43:20]
existence
[43:21]
of the existing pavement.
[43:23]
So, there's a basic pavement
[43:26]
inspection report that we
[43:27]
pulled.
[43:28]
And as you can see, majority
[43:29]
of taxiway Alpha, starting
[43:32]
from Quebec, you have colors
[43:33]
pink and red
[43:34]
that indicates that the
[43:35]
pavement is very poor
[43:37]
to serious condition,
[43:38]
which is continuing
[43:39]
to deteriorate.
[43:40]
So, we've taken a few field
[43:42]
photos, and to your right, you
[43:43]
can see that we have two and a
[43:45]
half inch wide cracks.
[43:47]
You can look closely, there's
[43:48]
like a walkie-talkie that
[43:49]
actually fits there.
[43:50]
And in the middle, we have
[43:51]
Taxiway Mainline, which has
[43:54]
longitudinal cracking, which
[43:56]
indicates that there's
[43:57]
structural failure
[43:58]
in the pavement.
[43:59]
And on the right,
[44:00]
you have extensive rutting,
[44:01]
which is caused by large
[44:02]
aircrafts either waiting or
[44:03]
entering,
[44:04]
exiting the cargo area.
[44:06]
So, something to keep you guys
[44:08]
in perspective is that this
[44:09]
pavement has not been
[44:10]
reconstructed from within 40
[44:11]
years.
[44:12]
So, there has been, you know,
[44:13]
concerns about FOD,
[44:15]
unsafe air traffic conditions,
[44:17]
and there's a risk of
[44:19]
incursions that occur that
[44:21]
maintenance has
[44:22]
to do ongoing performance.
[44:25]
So, in regards
[44:26]
to the project scope, we're
[44:28]
reconstructing the project and
[44:30]
it requires extended closures
[44:31]
for the existing taxiways.
[44:34]
during the construction and it
[44:35]
has multiple phases.
[44:37]
We have nighttime phases and
[44:38]
accelerated work areas
[44:40]
to mitigate any operations.
[44:42]
The new construction will
[44:44]
replace the existing asphalt
[44:46]
with durable concrete and we
[44:48]
will include reconstruction
[44:50]
of the taxiways and shoulders,
[44:52]
improve the pavement markings
[44:53]
and upgrade the airfield
[44:56]
lighting and signages and
[44:57]
enhance the storm grade
[44:59]
systems.
[45:02]
So we received two proposals
[45:04]
on March 27th, and we did the
[45:05]
technical evaluation and
[45:07]
interviews were completed in
[45:09]
April 13th. The bid
[45:10]
participation was competitive,
[45:13]
and it was determined that
[45:14]
Sully Miller Contracting
[45:15]
Company was the overall best
[45:17]
value to LAWA.
[45:19]
With the bids,
[45:20]
we were also qualified
[45:22]
for reimbursement
[45:23]
for the grants for FAA.
[45:27]
Now, a little bit
[45:28]
on inclusivity.
[45:29]
Now, because this project is...
[45:32]
federally funded, this contract
[45:33]
does not have a DB requirement.
[45:37]
However, Sully Miller
[45:39]
understands what it means
[45:41]
to LAWA and are willing to go
[45:42]
above and
[45:43]
beyond the requirements.
[45:45]
So, under the Workforce
[45:46]
Development Plan, the
[45:47]
contractor is committed
[45:48]
to these numbers.
[45:50]
So, you're going to engage into
[45:51]
outsourcing their community
[45:53]
services, engagement
[45:55]
to the elementary schools,
[45:57]
do summer internships, K-12
[45:59]
STEM outreach programs,
[46:02]
and continuing their mentor
[46:03]
protege programs.
[46:07]
In terms of their schedule,
[46:09]
so, the contractor is
[46:10]
to mobilize in November
[46:12]
of this year and then the start
[46:14]
of field construction will
[46:16]
begin in March of 2027
[46:17]
after the Super Bowl.
[46:20]
So we're going
[46:21]
to be completing the Taxiway
[46:22]
Alpha construction work
[46:23]
in early November and then we
[46:25]
get a little bit of a break
[46:26]
for a couple of months. So, that
[46:27]
way we can avoid any
[46:29]
of the operational impacts
[46:30]
during the holidays.
[46:32]
And then we resume construction
[46:33]
in January of 2028.
[46:35]
And that's a critical phase
[46:36]
for Tax-Free Foxtrot.
[46:38]
And then we have the remaining
[46:39]
construction in April.
[46:41]
So everything's going
[46:42]
to be done and completed prior
[46:43]
to the summer of the Olympics
[46:44]
in 2028.
[46:47]
And here I just kind
[46:48]
of reiterate about our request
[46:49]
for approval
[46:50]
on the appropriation for $108
[46:52]
million.
[46:56]
If you guys have any questions.
[46:58]
Thank you so much for the
[46:59]
presentation.
[47:01]
I just want to make sure this
[47:02]
construction is covered under
[47:03]
the project labor agreement.
[47:06]
Correct.
[47:08]
Yes, it is.
[47:09]
Okay.
[47:12]
I'll just make a note.
[47:13]
I appreciate that even though
[47:14]
this is, you know,
[47:16]
they're not beholden to the
[47:18]
workforce development quotas,
[47:19]
that they are adhering
[47:20]
to that.
[47:21]
So just a public appreciation
[47:23]
of that.
[47:24]
In the past, has this,
[47:25]
has something
[47:26]
like this been consistent
[47:28]
with only getting two bidders?
[47:32]
Oh in the past we usually have
[47:34]
between two to five bidders but
[47:37]
because there were, you know, so
[47:38]
many different work going on
[47:40]
these were our two bidders that
[47:42]
at the time bid
[47:44]
for this project.
[47:49]
I, umm,
[47:50]
thank you for the presentation
[47:52]
obviously we need that the fact
[47:53]
that it's been around for 40
[47:54]
years, speaks
[47:55]
for itself.
[47:56]
I have a math questions.
[47:57]
So, the motion would be
[48:00]
to approve an amount
[48:02]
of money not
[48:03]
to exceed basically $82
[48:04]
million.
[48:06]
Then it says the appropriation
[48:08]
of $108 million
[48:09]
for the project.
[48:11]
Can you explain the detail?
[48:13]
So, that would include, so the
[48:15]
$80 million that's on there is
[48:18]
regarding the main
[48:19]
construction.
[48:20]
So, that's the hard cost.
[48:21]
And then on top of that, we do
[48:23]
have some construction services
[48:25]
and some staffing support.
[48:26]
And then some contingency that
[48:27]
is included in that amount.
[48:30]
Okay.
[48:31]
But we're only approving no
[48:35]
more than 80 round numbers, 82
[48:36]
million?
[48:38]
82 million for the construction
[48:39]
contract.
[48:41]
All right.
[48:44]
I was confused by that too.
[48:45]
Thanks.
[48:46]
I thought I was reading it
[48:47]
differently.
[48:48]
I don't understand.
[48:49]
Oh, go ahead, Jake.
[48:50]
You have the same question.
[48:51]
Yeah.
[48:52]
Go ahead.
[48:53]
Because we're approving the
[48:54]
contract.
[48:55]
We're only requesting
[48:56]
appropriation
[48:57]
of the contract authority.
[48:58]
The project has its own total
[48:59]
cost budget.
[49:00]
That's the $108 million.
[49:02]
So today we're requesting
[49:03]
approval of the contract with
[49:05]
Sully Miller for $82 million.
[49:08]
Hopefully that...
[49:09]
That does.
[49:10]
Thank you. Thank you.
[49:16]
You're welcome.
[49:17]
Any other questions?
[49:20]
Thank you very much.
[49:22]
There are no further questions
[49:23]
or comments
[49:24]
could I please have a motion to
[49:26]
item number 12?
[49:27]
I'll make a motion.
[49:29]
Second.
[49:30]
Thank you, Commissioners Narro
[49:31]
and Roxborough.
[49:32]
All those in favor, say aye.
[49:33]
Aye.
[49:35]
Any opposed?
[49:36]
Ayes guys have it.
[49:37]
Item number 12 is approved.
[49:41]
Moving on to item number 13,
[49:45]
Aramayo.
[49:46]
Thank you.
[49:47]
Good morning, Commissioners,
[49:48]
and welcome, Commissioner
[49:49]
Daniels.
[49:51]
Looking forward to you being
[49:52]
on the commission.
[49:54]
So this board action is a
[49:55]
request
[49:56]
for capital appropriation.
[49:58]
This is not a contract item.
[50:01]
To upgrade our mission-critical
[50:03]
public safety infrastructure.
[50:06]
The systems that we are
[50:07]
upgrading are our access
[50:09]
control system, our
[50:11]
computer-aided police dispatch
[50:14]
system, and our video
[50:15]
management system.
[50:16]
And all of these systems are
[50:18]
essential
[50:19]
to protecting our passengers,
[50:20]
employees, our critical assets,
[50:23]
and airport operations.
[50:25]
This investment is going
[50:27]
to improve public safety.
[50:29]
It will also give us enhanced
[50:33]
analytics capabilities
[50:34]
for police to have automated
[50:37]
threat detection as well as
[50:39]
verification
[50:41]
of alarms so they don't have
[50:43]
to report and respond to all of
[50:45]
those alarms and it will
[50:46]
improve their situational
[50:48]
awareness.
[50:50]
This investment will also
[50:51]
reduce our cyber security risk
[50:54]
as much of the hardware and
[50:56]
software is being replaced with
[50:58]
the latest and greatest
[50:59]
technology.
[51:02]
This project is approved
[51:03]
within the 2024 capital
[51:05]
improvement plan.
[51:07]
We are using our IT master
[51:08]
service agreements
[51:10]
to implement the work.
[51:11]
The timeline
[51:13]
for the project is 18 months so
[51:15]
it will be completed and
[51:17]
in operation prior to the 2028
[51:20]
Olympics and Paralympic Games
[51:22]
and 35% of the total dollar
[51:26]
value will be going
[51:27]
to SBE firms
[51:28]
on those master service
[51:30]
agreement bench contracts.
[51:33]
So, the request is to approve
[51:35]
the capital appropriation of
[51:38]
$17,848,000
[51:41]
for this dispatch, access
[51:44]
control, and video management
[51:46]
system modernization project.
[51:49]
And I can answer any questions
[51:50]
if there are any.
[51:53]
Is it replacing all the ACAMs
[51:55]
on all the doors?
[51:57]
Some of those are faulty and
[51:58]
they go off.
[52:00]
So, no, this is actually
[52:02]
replacing our head-in system.
[52:04]
So, the vendor has advanced the
[52:08]
technology a couple versions
[52:10]
ahead of the version of the
[52:12]
platform that we're running
[52:13]
today.
[52:14]
So, we are upgrading the system
[52:15]
that actually controls the
[52:18]
controllers that then controls
[52:20]
all of the hardware that's
[52:21]
at the doors.
[52:22]
So, it's the brains
[52:23]
of the system itself.
[52:26]
Yes.
[52:30]
Questions from or comments
[52:31]
from the board?
[52:33]
Could I have a motion
[52:35]
to approve item number 13.
[52:37]
So moved.
[52:38]
Second.
[52:39]
Thank you commissioners
[52:40]
Velasco and La Bau.
[52:41]
All those in favor say aye.
[52:42]
Aye.
[52:43]
Any opposed?
[52:44]
The ayes have it.
[52:45]
Item number 13 is approved.
[52:47]
Thank you.
[52:48]
Thank you commissioners.
[52:51]
Moving to item number 14. Mr.
[52:54]
Doug Webster again.
[53:06]
Good morning, Vice President
[53:07]
Aramayo, Commissioners, CEO.
[53:11]
My name is Fu Tong with the
[53:13]
Facilities Management
[53:14]
Division.
[53:15]
I'll be speaking on this item
[53:16]
on behalf of Mr.
[53:17]
Webster.
[53:18]
Before you today is a request
[53:21]
to approve a five-year sole
[53:23]
source contract with Solar
[53:24]
Turbines Incorporated
[53:27]
in an amount not to exceed $16
[53:28]
million for the maintenance,
[53:30]
repair, technical support,
[53:32]
and overhaul services
[53:33]
for the two Mercury 50
[53:35]
Gas Turbines located
[53:37]
at the LX Central Utility
[53:38]
Plant.
[53:40]
Approximately $5 million of
[53:41]
this contract authority will be
[53:43]
allocated for the Beneficial
[53:44]
Use Service Agreement, which
[53:46]
includes a dedicated fleet
[53:47]
manager, on-site maintenance,
[53:50]
remote troubleshooting and
[53:51]
support, component replacement,
[53:53]
and schedule inspections and
[53:54]
reports.
[53:56]
The remaining $11 million will
[53:57]
be used for anticipated major
[53:59]
maintenance activities over the
[54:00]
next five years including
[54:03]
turbine overhauls recuperator
[54:05]
and replacements and major
[54:06]
repairs.
[54:08]
These two turbines are critical
[54:10]
components of LAX of LAWA's
[54:13]
energy infrastructure.
[54:15]
Installed in 2014 as part
[54:17]
of the cup replacement project,
[54:19]
each turbine generates
[54:20]
approximately 4.2 megawatts
[54:22]
of electricity to support the
[54:24]
thermal energy systems that
[54:25]
support cooling and heating
[54:27]
throughout the central terminal
[54:28]
area, admin east and the theme
[54:31]
building.
[54:32]
In addition to supporting cut
[54:33]
thermal systems, the turbines
[54:35]
also provide electrical power
[54:36]
to the CTA parking structures
[54:39]
2-6, airport traffic signal
[54:41]
systems, and lower-level
[54:45]
roadway lighting.
[54:48]
As a key component of LAWAS'
[54:49]
sustainability and resiliency
[54:50]
strategy, this cogeneration
[54:53]
system improves overall energy
[54:55]
efficiency by simultaneously
[54:57]
producing electricity, heating,
[54:59]
and cooling
[55:00]
from a single fuel source.
[55:02]
By capturing and reusing
[55:05]
thermal energy that would
[55:07]
otherwise be wasted, the cold
[55:08]
generation system reduces
[55:10]
operating costs,
[55:11]
lower greenhouse gas emissions,
[55:13]
and provides greater energy
[55:15]
resiliency compared to
[55:16]
conventional energy systems.
[55:19]
The result is a more efficient,
[55:20]
reliable, and sustainable
[55:22]
energy infrastructure that
[55:23]
supports airports' continuous
[55:25]
24-7 operations.
[55:28]
Because Solar Turbines is the
[55:29]
original equipment manufacturer
[55:32]
and has not authorized or
[55:33]
licensed any third party to
[55:35]
perform maintenance repairs or
[55:37]
overhauls on these turbines, a
[55:39]
sole source contract is
[55:40]
necessary
[55:41]
to ensure the continuous safe,
[55:43]
reliable,
[55:44]
and efficient operation of this
[55:45]
critical infrastructure.
[55:48]
Thank you and I'm available
[55:49]
for any questions you may have.
[55:57]
I have...just a question of
[55:58]
clarification.
[56:00]
I read the report.
[56:01]
It was, it was interesting that
[56:02]
it sounds
[56:03]
like no one else can do this.
[56:06]
They're the manufacturer, they
[56:08]
haven't authorized anyone
[56:12]
else. So, it sounds like into
[56:14]
perpetuity or certainly as long
[56:15]
as the cut equipment lasts.
[56:18]
This will be our vendor. Am I
[56:20]
reading that correctly?
[56:22]
That's correct.
[56:24]
You anticipate any new players
[56:26]
in that industry or this is it?
[56:30]
We are, we'll be looking at
[56:33]
other players that can provide
[56:35]
similar make and model that can
[56:37]
provide similar productivity
[56:40]
co-generation wise and we will
[56:42]
be seeing what's available
[56:44]
on the market right now.
[56:46]
From previous research there's
[56:47]
a lot of folks in this room
[56:48]
that have done a lot
[56:49]
of studies
[56:50]
on this previously.
[56:52]
There are vendors
[56:53]
out there are capable
[56:54]
of doing it.
[56:55]
However, there's a lot
[56:56]
of complexity when it comes
[56:58]
to swapping out the cogens.
[57:01]
So, obviously there's an
[57:03]
investment that needs
[57:05]
to be done and looked at.
[57:06]
And we have to look
[57:07]
at the overall cost analysis
[57:09]
to determine what's feasible
[57:11]
to be done.
[57:12]
And then whoever comes in,
[57:15]
you're in a way stuck with that
[57:16]
vendor or somebody equal.
[57:19]
Sounds like, we've got a
[57:20]
five-year time frame...
[57:25]
...next time around.
[57:28]
Yes, and that is where we're
[57:30]
having the discussion as we
[57:31]
speak.
[57:33]
We're going to be regrouping
[57:34]
with our Air Force
[57:35]
Development Group, our
[57:36]
environmental group,
[57:37]
and see what the plan
[57:38]
for will be.
[57:43]
Any other comments or questions
[57:44]
from the board?
[57:47]
Could I please have a motion
[57:48]
to approve item number 14?
[57:52]
So moved.
[57:54]
The second?
[57:55]
Second.
[57:56]
Thank you, Commissioners La
[57:57]
Bau and Narro.
[57:58]
All those in favor,
[57:59]
please say aye.
[58:00]
Aye.
[58:01]
Any opposed?
[58:03]
The ayes have it.
[58:04]
Item number 14 is approved.
[58:05]
Thank you.
[58:06]
Thank you.
[58:08]
And I'm also number 15, so I'm
[58:10]
sticking around.
[58:11]
Welcome back.
[58:12]
Short commute.
[58:14]
All right.
[58:15]
Item 15 is a request
[58:17]
to approve the second amendment
[58:18]
to contract DA-5660 with
[58:21]
Uniserve Facility Services
[58:23]
for RAM scrubbing, cleaning,
[58:24]
and sweeping services
[58:25]
at LAX.
[58:26]
This amendment will extend the
[58:28]
contract term by one year to
[58:30]
October 22, 2027, and add a
[58:33]
one-year renewal option and
[58:34]
increase the contract authority
[58:35]
by $3.2 million for a revised
[58:38]
not-to-exceed amount of $7
[58:40]
million.
[58:41]
These services are essential to
[58:42]
maintaining safe and reliable
[58:45]
airfield and RAM operations.
[58:47]
RAM scrubbing and sweeping are
[58:49]
performed
[58:50]
on a regular scheduled basis
[58:52]
to remove grease, oil, dirt,
[58:54]
and debris, maintain adequate
[58:56]
pavement surface traction for
[58:57]
aircraft towing and pushback
[58:59]
operations,
[59:00]
reduce slip and fall hazards
[59:02]
for ground operations
[59:03]
personnel,
[59:04]
and support compliance with FAA
[59:05]
regulations and requirements.
[59:08]
The current contract was
[59:09]
awarded in September 2023
[59:12]
with a not to excide amount of
[59:15]
$3 million and is scheduled to
[59:16]
expire in October 22nd, 2026.
[59:19]
In April 2026, the board had
[59:22]
previously approved a First
[59:24]
Amendment increasing the
[59:26]
contract authority by
[59:27]
$800,000, bringing the total
[59:28]
contract to $3.8 million.
[59:31]
However, due to ongoing
[59:33]
operational service
[59:35]
requirements, increased labor
[59:36]
costs,
[59:37]
including adjustments
[59:38]
associated with the city's
[59:39]
living wage ordinance,
[59:41]
and additional time required to
[59:42]
complete a competitive
[59:43]
solicitation
[59:45]
for accessor contract, the
[59:47]
remaining contract authority is
[59:48]
no longer sufficient
[59:50]
to support services
[59:51]
through the contract term.
[59:52]
The contract includes
[59:54]
participation goals of 15% for
[59:56]
small business enterprise and
[59:58]
2% for disabled veteran
[1:00:00]
business enterprise.
[1:00:02]
Uniserve has met these goals
[1:00:04]
achieving 18.1...I'm sorry,
[1:00:06]
15.81% participation
[1:00:09]
in subcontracting expenditures
[1:00:11]
through Facility Force
[1:00:12]
Corporation, which is certified
[1:00:14]
as both an SB and a DVBE.
[1:00:20]
While the board report
[1:00:21]
currently reflects a
[1:00:22]
participation rate of 12.4%,
[1:00:25]
the most current data available
[1:00:27]
in the B2G Now system shows
[1:00:31]
that there are 15.81%.
[1:00:34]
This amendment will provide the
[1:00:35]
necessary time and funding to
[1:00:37]
maintain uninterrupted ramp
[1:00:40]
scrubbing, cleaning, and
[1:00:41]
sweeping surfaces while staff
[1:00:43]
completes the competitive
[1:00:44]
procurement process
[1:00:45]
for a successor agreement.
[1:00:47]
If a successor contract is
[1:00:49]
awarded and executed sooner,
[1:00:51]
LAWA retains the ability to
[1:00:52]
terminate the current contract
[1:00:54]
for convenience.
[1:00:56]
Thank you, and I'm available
[1:00:57]
for any questions regarding
[1:00:58]
this item.
[1:01:03]
Quick question.
[1:01:04]
How many subcontractors are
[1:01:05]
involved?
[1:01:07]
One.
[1:01:08]
Facilities force.
[1:01:09]
When you bring
[1:01:10]
in a subcontractor, is it the
[1:01:11]
contractor's responsibility
[1:01:12]
to inform them about the living
[1:01:15]
wage ordinance and other
[1:01:16]
policies?
[1:01:18]
Is that our obligation?
[1:01:21]
That I'm not clear.
[1:01:23]
I can get back to you
[1:01:24]
on that one.
[1:01:25]
Ms.
[1:01:26]
Hopenstam?
[1:01:29]
Yes.
[1:01:30]
It is a common...
[1:01:31]
contract term
[1:01:32]
to require the contractor to
[1:01:34]
include as a mandatory
[1:01:36]
provision
[1:01:37]
in all subcontract?s information
[1:01:39]
of such items and mandatory
[1:01:40]
policies and ordinances as a
[1:01:42]
living wage.
[1:01:46]
Any other questions?
[1:01:49]
Could I please have a motion to
[1:01:50]
approve item number 15?
[1:01:55]
I make a motion.
[1:01:56]
Second.
[1:01:57]
Thank you, Commissioners Narro
[1:01:58]
and Roxborough.
[1:02:00]
All those in favor,
[1:02:01]
please say aye.
[1:02:02]
Aye.
[1:02:03]
Any opposed?
[1:02:04]
Item number 15 is approved.
[1:02:07]
Thank you.
[1:02:08]
Thank you, commissioners.
[1:02:10]
Moving on to item number 16,
[1:02:12]
Ms.
[1:02:13]
Chandler.
[1:02:15]
Good morning, commissioners.
[1:02:17]
Good morning, Vice President
[1:02:18]
Aramayo and board and
[1:02:21]
Commissioner Daniels, Welcome
[1:02:22]
and thank you
[1:02:23]
for being here and thank you
[1:02:24]
for your service.
[1:02:26]
So, I am here to request...
[1:02:29]
that you adopt the staff report
[1:02:31]
and approve the award, a
[1:02:33]
three-year contract award for...
[1:02:36]
with two additional one-year
[1:02:38]
term options to Baker Tilly
[1:02:40]
for our external audit services
[1:02:43]
for LAWA and in the amount not
[1:02:46]
to exceed 1.65 million.
[1:02:52]
Questions?
[1:02:54]
Oh, I'm sorry.
[1:02:55]
It's not a presentation.
[1:02:56]
It's an audit.
[1:02:59]
She was so fascinated by the
[1:03:00]
CSF.
[1:03:03]
Maybe I should introduce
[1:03:04]
myself, Antoinette Chandler,
[1:03:05]
CFO.
[1:03:06]
Audit is important to me.
[1:03:09]
So all good.
[1:03:10]
Just to give you guys,
[1:03:11]
I won't belabor this, but we
[1:03:13]
did run a competitive process.
[1:03:15]
We went through a thorough
[1:03:17]
evaluation and decided that
[1:03:20]
Baker Tilly was the most
[1:03:22]
qualified,
[1:03:23]
the best positioned firm
[1:03:25]
for us to continue
[1:03:26]
to work with.
[1:03:27]
And I'll just say exciting
[1:03:29]
about Baker Tilly meeting these
[1:03:32]
business enterprise goals.
[1:03:33]
So, they have some actually
[1:03:36]
subcontracted with as part
[1:03:38]
of their RFP process with
[1:03:39]
Simpson & Simpson, which is a
[1:03:40]
minority-owned firm.
[1:03:42]
So that's just fantastic,
[1:03:44]
their commitment to align
[1:03:46]
with our goals and objectives.
[1:03:49]
You all know this is mandate
[1:03:51]
by our indenture that we have
[1:03:53]
to come forward with an
[1:03:55]
external audit every year.
[1:03:56]
I will say that it's just a
[1:03:58]
reminder here that it's just
[1:03:59]
good governance and good
[1:04:01]
business practice,
[1:04:02]
good corporate governance
[1:04:03]
to have an audit every year.
[1:04:05]
So with that, I am asking
[1:04:09]
for your approval
[1:04:11]
of this contract not
[1:04:12]
to exceed $1.65 million
[1:04:15]
over the three-year term
[1:04:16]
with two one-year options.
[1:04:20]
Any questions?
[1:04:21]
Yes, I have a question.
[1:04:22]
This is a new contract
[1:04:23]
with this company, right? That
[1:04:25]
we didn't contract
[1:04:26]
with them before?
[1:04:27]
Uh, we have
[1:04:28]
contracted with them before.
[1:04:29]
They actually are an incumbent,
[1:04:31]
and they've been with us
[1:04:32]
for eight years.
[1:04:33]
Okay. Thank you.
[1:04:34]
And on that question, I'm going
[1:04:36]
to save a lot of time for
[1:04:37]
Vice Chair Aramayo
[1:04:39]
to ask questions on this.
[1:04:42]
On a serious note,
[1:04:44]
how many proposals were there
[1:04:46]
in addition?
[1:04:47]
Nine.
[1:04:48]
Yes.
[1:04:49]
So,
[1:04:50]
there were, oops, I'll go back.
[1:04:51]
I heard somebody say nine.
[1:04:52]
Nine proposals.
[1:04:53]
Okay. I missed that.
[1:04:54]
Then I agree with you
[1:04:55]
about the due diligence,
[1:04:56]
and I appreciate you commenting
[1:04:57]
on that. And they also have
[1:04:58]
expertise for the bond issuance
[1:05:00]
issue that is on the agenda
[1:05:01]
for today as well.
[1:05:04]
Correct.
[1:05:05]
Okay.
[1:05:06]
That's very important as well.
[1:05:07]
So, thank you for that.
[1:05:08]
Appreciate it.
[1:05:09]
Thank you.
[1:05:10]
Can you go
[1:05:11]
to the next slide?
[1:05:14]
Three-year base
[1:05:15]
with two-year option.
[1:05:16]
So, they'll be doing an audit
[1:05:18]
for three fiscal years?
[1:05:20]
Three fiscal years,
[1:05:21]
starting this fiscal year for
[1:05:22]
27.
[1:05:23]
Perfect.
[1:05:24]
And I would add, didn't expect
[1:05:26]
to spend this much time
[1:05:27]
on the audit, but I'm happy
[1:05:29]
to do that,
[1:05:30]
that we will be bringing
[1:05:31]
Baker Tilly forward
[1:05:32]
for audit committee next month.
[1:05:35]
So, you'll have an opportunity
[1:05:36]
to engage and get some more
[1:05:39]
clarity on the scope
[1:05:40]
of our audit for 27.
[1:05:43]
That was a side question later.
[1:05:44]
Thank you.
[1:05:45]
Okay.
[1:05:46]
Thank you.
[1:05:47]
The amount not to exceed $1.6
[1:05:48]
million includes the two
[1:05:50]
one-year options?
[1:05:52]
It includes.
[1:05:53]
That does include the two
[1:05:54]
one-year options.
[1:05:55]
Thank you.
[1:05:56]
Any other questions or
[1:05:57]
comments?
[1:05:58]
I have a new commissioner
[1:05:59]
question.
[1:06:00]
Okay.
[1:06:02]
LAX always had clean audits?
[1:06:07]
Always is a long time.
[1:06:08]
Yeah.
[1:06:10]
In the last 10 years.
[1:06:12]
Seriously, what's been LAX's
[1:06:14]
history...audits?
[1:06:17]
Well, I haven't been here for
[1:06:18]
10 years but I can tell you...
[1:06:20]
I'm just curious.
[1:06:22]
Yeah,
[1:06:23]
but I can tell you the last 5
[1:06:24]
years I know, clean audit, 10
[1:06:26]
years, clean audit.
[1:06:31]
Clean audit, but...
[1:06:32]
sometimes means corrections
[1:06:36]
encouraged by the auditor.
[1:06:37]
So I've been here 20 years,
[1:06:39]
and so during that,
[1:06:41]
I don't know if it was the last
[1:06:42]
10 years, but there have been
[1:06:43]
times when we've had audits and
[1:06:44]
recommendations,
[1:06:45]
and then we take on those
[1:06:46]
recommendations that become
[1:06:48]
part of the report.
[1:06:49]
Yeah, so when the auditors come
[1:06:51]
in, they give us a qualified
[1:06:53]
opinion, okay?
[1:06:54]
So that would be characterized
[1:06:56]
as a clean audit.
[1:06:57]
Now, with that, they do
[1:06:59]
provide,
[1:07:00]
as they're doing their audit,
[1:07:01]
any management recommendations
[1:07:03]
where there's improvement for
[1:07:05]
internal controls and the like.
[1:07:07]
They also take a look at,
[1:07:09]
so we do a single audit,
[1:07:11]
and we're required to do a
[1:07:12]
single audit whenever you take
[1:07:14]
on federal dollars.
[1:07:16]
And so, they, you know,
[1:07:18]
our process of going
[1:07:19]
through all that,
[1:07:20]
making sure that we're
[1:07:21]
in compliance there,
[1:07:22]
if they find any
[1:07:23]
recommendations to help
[1:07:24]
strengthen our compliance
[1:07:26]
process, they'll make those
[1:07:27]
recommendations.
[1:07:29]
There's a few of us
[1:07:30]
on the audit committee,
[1:07:31]
so we have a meeting
[1:07:32]
to have an exchange with the
[1:07:35]
auditors and also ask them
[1:07:37]
questions.
[1:07:39]
That is correct,
[1:07:40]
and that will be August 27th.
[1:07:42]
We'll come before you.
[1:07:44]
But any suggestions that the
[1:07:45]
auditor may make when
[1:07:46]
evaluating, I mean, that's
[1:07:47]
normal, right?
[1:07:49]
Correct.
[1:07:50]
That's part of the normal audit
[1:07:51]
process and not negating or
[1:07:54]
making it non-clean.
[1:07:56]
Yeah.
[1:07:57]
And I just want to be clear,
[1:07:58]
we can have a qualified opinion
[1:08:00]
with recommendations.
[1:08:02]
Right.
[1:08:03]
Right.
[1:08:04]
Very good.
[1:08:05]
Any other questions or
[1:08:06]
comments?
[1:08:07]
Vice President Aramayo, if I
[1:08:08]
may, I'm the one who decided
[1:08:10]
to put this
[1:08:11]
on the regular agenda.
[1:08:12]
And the reason I did it is kind
[1:08:13]
of what Commissioner
[1:08:14]
Roxborough said, that this is,
[1:08:15]
you know,
[1:08:16]
we have multiple layers of
[1:08:17]
governance and controls and
[1:08:18]
experts that help us do our
[1:08:19]
jobs.
[1:08:20]
Baker Tilly is one of the firms
[1:08:22]
that, you know, we rely
[1:08:23]
on as staff
[1:08:24]
to make sure that, you know,
[1:08:25]
we're keeping our books
[1:08:26]
properly in layman's terms and
[1:08:28]
that you rely
[1:08:29]
on as commissioners.
[1:08:30]
So, we thought it was important
[1:08:31]
to show you and have a little
[1:08:33]
discussion about this.
[1:08:34]
Not as long as we expected, but
[1:08:35]
I think it was a healthy
[1:08:36]
discussion because this is a
[1:08:37]
really important part of the
[1:08:38]
governance process that the
[1:08:40]
public expects of us.
[1:08:41]
Yep.
[1:08:43]
Thank you.
[1:08:45]
Thank you.
[1:08:46]
Could I have a motion
[1:08:47]
to approve item number 16?
[1:08:48]
So moved.
[1:08:49]
Thank you, Commissioners
[1:08:50]
Roxborough and La Bau.
[1:08:52]
All those in favor,
[1:08:54]
please say aye.
[1:08:55]
Aye.
[1:08:56]
Any opposed?
[1:08:57]
The ayes have it.
[1:08:58]
Thank you very much, Mr.
[1:08:59]
Chandler.
[1:09:00]
Item number 16 is approved.
[1:09:02]
Moving on to item number 17,
[1:09:05]
I'd like to invite Ms.
[1:09:07]
Chandler to say.
[1:09:09]
Thank you.
[1:09:12]
Okay, so I'll jump right
[1:09:14]
in here on our commercial paper
[1:09:16]
program.
[1:09:17]
So, we are here seeking your
[1:09:19]
approval for the replacement of
[1:09:21]
the financial institutions that
[1:09:23]
provide the liquidity facility,
[1:09:26]
letter
[1:09:27]
of credit as we call them, that
[1:09:28]
supports our commercial paper
[1:09:29]
program.
[1:09:33]
And so, when we step back and
[1:09:35]
think about the size and scope
[1:09:37]
of our...
[1:09:39]
our capital program there are a
[1:09:42]
couple of mechanisms that we
[1:09:43]
can use when we go out to
[1:09:45]
actually fund that. Our capital
[1:09:49]
program we can do short-term
[1:09:50]
borrowing and then we can do
[1:09:52]
long-term borrowing and I'm
[1:09:53]
going to be talking about just
[1:09:55]
here briefly both those
[1:09:57]
mechanisms that we use
[1:09:58]
for funding our capital
[1:09:59]
projects. In this case we have a
[1:10:02]
commercial paper program and
[1:10:04]
we're coming before you
[1:10:07]
informing you that the capacity
[1:10:08]
on that program is $500
[1:10:10]
million.
[1:10:11]
We've gone through a
[1:10:14]
competitive process.
[1:10:15]
There were five proposers that
[1:10:19]
came to us asking if they could
[1:10:20]
provide us
[1:10:21]
with this liquidity facility,
[1:10:24]
the letter of credit.
[1:10:25]
And of those,
[1:10:26]
we actually chose two.
[1:10:29]
One is an incumbent, Bank of
[1:10:30]
America.
[1:10:32]
And then the other one is a new
[1:10:34]
entrant for us in terms
[1:10:36]
of the credit facility,
[1:10:37]
which is TD Bank.
[1:10:40]
Bank of America has provided us
[1:10:42]
with $300 million
[1:10:44]
in credit facility support.
[1:10:48]
Previously, they were $100
[1:10:49]
million,
[1:10:50]
so they did step up their
[1:10:52]
commitment, $200 million,
[1:10:53]
and so we're thankful
[1:10:54]
for that, by $200 million.
[1:10:55]
And then we have TD Bank that
[1:10:57]
came in at $200 million.
[1:11:00]
to comprise the $500 million
[1:11:01]
of coverage.
[1:11:03]
One other thing that I think is
[1:11:05]
important just structure-wise
[1:11:07]
for you all to know,
[1:11:09]
we as part of our credit
[1:11:11]
facilities we had four-year
[1:11:13]
term.
[1:11:14]
This year we went out and
[1:11:15]
decided to go with a five-year
[1:11:17]
term as we're thinking about
[1:11:19]
what our funding needs will be
[1:11:21]
over the next five years.
[1:11:23]
So we just wanted to map that
[1:11:24]
accordingly and make sure we
[1:11:25]
had the right level
[1:11:27]
of capacity.
[1:11:29]
And from a cost standpoint,
[1:11:31]
that extra year, I'm going
[1:11:33]
to speak Wall Street terms,
[1:11:35]
only cost us
[1:11:36]
about two basis points.
[1:11:37]
So for the amount of credit
[1:11:39]
that they are providing to us
[1:11:41]
to extend a year,
[1:11:42]
it just made sense
[1:11:43]
to do that.
[1:11:44]
So that's why we went
[1:11:45]
with the five years.
[1:11:47]
We currently have about $390
[1:11:51]
million outstanding on that.
[1:11:52]
And when I talk about our
[1:11:55]
long-term...
[1:11:58]
the bond financing.
[1:12:01]
I'll talk
[1:12:02]
about how we're going to take
[1:12:03]
out some of this short term.
[1:12:05]
But the simple way to think
[1:12:07]
about this is when we get ready
[1:12:09]
to fund a capital project,
[1:12:11]
it's much more cost effective
[1:12:12]
for us and efficient for us to
[1:12:14]
use a commercial paper program,
[1:12:17]
like basically bridge
[1:12:18]
financing.
[1:12:19]
And then when we are ready and
[1:12:21]
the market conditions are right
[1:12:22]
for us to do so, we'll take
[1:12:24]
out that financing
[1:12:26]
and fix it out long term
[1:12:27]
over a 30-year period.
[1:12:29]
Because a commercial paper
[1:12:30]
program,
[1:12:31]
we can only issue maturities up
[1:12:33]
to 270 days, and typically we
[1:12:35]
do, we kind of roll it for
[1:12:37]
about every 60 days.
[1:12:39]
So we go out into the market
[1:12:40]
and issue those short term
[1:12:41]
instruments.
[1:12:45]
Let's see, okay.
[1:12:48]
Talked a little bit
[1:12:49]
about this, so I think I've
[1:12:50]
pretty much covered most
[1:12:52]
of this.
[1:12:53]
So we're...
[1:12:54]
here today again just seeking
[1:12:55]
your approval
[1:12:57]
of the new banks that are
[1:12:58]
coming into our liquidity
[1:13:01]
facility portfolio and then
[1:13:02]
we're also asking you for, to
[1:13:05]
approve the documents that are
[1:13:07]
associated with being able
[1:13:08]
to bring that credit facility
[1:13:11]
to close. And I'm happy to take
[1:13:14]
any questions.
[1:13:18]
Any questions
[1:13:19]
from the board? Thank you very
[1:13:24]
much.
[1:13:25]
Thank you.
[1:13:27]
I'd like to have a motion
[1:13:29]
to approve amendment, excuse
[1:13:32]
me, to approve item number
[1:13:33]
17.
[1:13:34]
I'll make a motion.
[1:13:36]
Second.
[1:13:37]
Thank you, Commissioners La
[1:13:38]
Bau and Narro.
[1:13:39]
All those in favor,
[1:13:40]
please say aye.
[1:13:41]
Aye.
[1:13:42]
Any opposed?
[1:13:43]
The ayes have it.
[1:13:44]
Item number 16 is excuse me,
[1:13:47]
17 is approved.
[1:13:49]
Thank you.
[1:13:52]
And the last item
[1:13:53]
on the agenda, item number
[1:13:54]
18.
[1:13:56]
Thank you.
[1:13:57]
Earning my keep today.
[1:14:00]
Okay, commissioners,
[1:14:02]
so we're coming
[1:14:03]
before you asking for approval
[1:14:10]
to issue $3 billion
[1:14:12]
in bonds.
[1:14:14]
not to exceed $3 billion
[1:14:16]
in bonds.
[1:14:17]
And this request is partial new
[1:14:22]
money and refunding.
[1:14:23]
And I'll explain a little bit
[1:14:25]
of that in just a second.
[1:14:26]
And then we also want to make
[1:14:28]
sure that we allow ourselves
[1:14:30]
just a little bit
[1:14:31]
of capacity when we go out
[1:14:32]
into the market,
[1:14:33]
that if conditions are really
[1:14:35]
favorable, we want
[1:14:36]
to have an opportunity
[1:14:37]
to maybe lock
[1:14:38]
in rates that are favorable
[1:14:40]
at that time.
[1:14:41]
We call that a sizing up,
[1:14:43]
if you will.
[1:14:44]
And so, we've left a little
[1:14:45]
capacity to do that.
[1:14:46]
And so, we're asking
[1:14:48]
for approval on that today.
[1:14:50]
Also want to remind you all,
[1:14:53]
let me take it back
[1:14:55]
to last month when I talked
[1:14:57]
to you about what our capital
[1:15:01]
expense needs would be
[1:15:03]
for fiscal 24.
[1:15:05]
And I mentioned
[1:15:06]
to you that it was about a $4
[1:15:08]
billion spend.
[1:15:09]
So, we're coming to you
[1:15:11]
today to ask for, again,
[1:15:14]
the approval for us to be able
[1:15:16]
to fund that
[1:15:17]
through the debt financing.
[1:15:18]
So, that's what this represents.
[1:15:21]
So, we have about, currently,
[1:15:23]
about $12 billion that's
[1:15:26]
outstanding.
[1:15:28]
And I always love to give a
[1:15:29]
statistic here just so you all
[1:15:31]
have a sense
[1:15:32]
of what that means.
[1:15:34]
So, I look at metrics
[1:15:36]
like weighted average cost
[1:15:37]
of debt.
[1:15:38]
And so, all that $12 billion is
[1:15:41]
currently outstanding that LAWA
[1:15:42]
is paying for is costing us
[1:15:44]
on average,
[1:15:45]
on a weighted average basis,
[1:15:46]
about 3.72%.
[1:15:49]
So, that's pretty good rates
[1:15:52]
to lock in
[1:15:53]
on a fixed rate basis.
[1:15:55]
You'll see here also that we
[1:15:56]
have about $400 million
[1:15:59]
in commercial paper.
[1:16:01]
And I mentioned earlier there
[1:16:03]
was a notation there about
[1:16:04]
$390 million that we'll take
[1:16:06]
out of that,
[1:16:07]
but that's outstanding.
[1:16:08]
And as part
[1:16:09]
of this financing,
[1:16:10]
we're actually going to
[1:16:12]
reimburse ourselves and take
[1:16:14]
that commercial paper line
[1:16:17]
down to zero.
[1:16:18]
So, we'll pay off the commercial
[1:16:19]
paper and basically fix that
[1:16:21]
out from short-term
[1:16:22]
to long-term financing.
[1:16:26]
You can see here,
[1:16:27]
in previous resolutions,
[1:16:29]
you all have approved $9
[1:16:32]
billion in authorization under
[1:16:35]
the '22 and '24 resolutions.
[1:16:39]
So, I just thought it was
[1:16:40]
important
[1:16:41]
to show you where we are
[1:16:42]
in terms of resolution
[1:16:43]
authority that we still have.
[1:16:46]
So, issue to date is the $3.4.
[1:16:49]
If we were to add the $3
[1:16:50]
billion onto this,
[1:16:51]
you'll see that we're
[1:16:52]
within that authority. And
[1:16:55]
again, we're just coming
[1:16:56]
to you asking for approval to
[1:16:57]
go ahead and execute and issue
[1:16:59]
those bonds next month.
[1:17:01]
When you
[1:17:02]
take out the $400 million on
[1:17:06]
commercial, where does that come
[1:17:07]
from? What money is used
[1:17:08]
to take that out?
[1:17:09]
The long-term financing.
[1:17:10]
The Long-term financing
[1:17:11]
of the $3 billion?
[1:17:12]
Of the $3 billion.
[1:17:13]
Thank you.
[1:17:14]
So that's included.
[1:17:15]
Yes.
[1:17:16]
Okay.
[1:17:18]
Before I get into the projects
[1:17:21]
that are funded,
[1:17:22]
I think it's really important
[1:17:24]
for you all to know,
[1:17:25]
and I want to acknowledge,
[1:17:26]
I think there's some folks here
[1:17:27]
from our financing team.
[1:17:30]
When we sit
[1:17:31]
down and make a decision to go
[1:17:32]
out to the market, we pulled
[1:17:34]
together a pretty comprehensive
[1:17:37]
team of folks that work
[1:17:39]
on LAWA's behalf.
[1:17:40]
And it is lawyers,
[1:17:42]
it is financial advisors, our
[1:17:45]
financial institutions or our
[1:17:47]
banking partners.
[1:17:49]
And you have lawyers
[1:17:50]
on every side of that.
[1:17:52]
We've got a bond counsel that
[1:17:55]
represents us and our best
[1:17:56]
interests and makes sure that
[1:17:58]
when we're putting these
[1:17:59]
documents together and putting
[1:18:00]
them in front
[1:18:01]
of you as a board, they have
[1:18:03]
been
[1:18:04]
thoroughly, thoroughly vetted,
[1:18:06]
right?
[1:18:07]
Because we want to make sure
[1:18:08]
that we're doing everything we
[1:18:09]
can to have the proper
[1:18:11]
disclosures when we go out to
[1:18:13]
the public markets and there's
[1:18:14]
virtually no risk of being,
[1:18:19]
not disclosing what's important
[1:18:21]
for us to disclose.
[1:18:22]
So, I just want to make sure you
[1:18:23]
understand that.
[1:18:24]
I also want to make sure you
[1:18:25]
understand that we hire a bond
[1:18:27]
counsel, we hire a disclosure
[1:18:29]
counsel, those two counsels are
[1:18:31]
coming together
[1:18:32]
making sure that these
[1:18:33]
documents are
[1:18:35]
like airtight right
[1:18:36]
before we go out
[1:18:37]
to the market.
[1:18:38]
Then we have our financial
[1:18:39]
partners,
[1:18:40]
Jefferies is our senior lead
[1:18:42]
banker underwriter along with
[1:18:45]
Goldman Sachs and then
[1:18:46]
co-managers we have Bank of
[1:18:48]
America and minority-owned firm
[1:18:50]
Siebert William Schenck.
[1:18:51]
These are folks that are
[1:18:53]
top-notch professionals
[1:18:54]
in this industry that bring
[1:18:56]
tons of airport bonds
[1:18:58]
to the market.
[1:18:59]
So, we're all working together
[1:19:01]
in concert to make sure that
[1:19:03]
LAWA is well represented,
[1:19:05]
but also protected.
[1:19:07]
Okay.
[1:19:08]
And then just lastly,
[1:19:10]
I just want to acknowledge our
[1:19:11]
financial advisor, Frasca, our
[1:19:13]
airport consultants.
[1:19:14]
When you look at these
[1:19:16]
documents and see what we call
[1:19:18]
the report of airport
[1:19:19]
consultants that supports these
[1:19:21]
financings, which is WJA. And
[1:19:24]
then, of course,
[1:19:25]
as money is changing hands, we
[1:19:26]
have a trustee who's making
[1:19:28]
sure that the money is getting
[1:19:29]
where it's supposed to back and
[1:19:31]
forth when we close the
[1:19:32]
transaction.
[1:19:34]
Okay.
[1:19:35]
So, let's talk about what this
[1:19:37]
$3 billion is going to do.
[1:19:40]
So, $2 billion of it will be
[1:19:43]
what I call new money. Okay.
[1:19:44]
And that's just a fancy term of
[1:19:47]
saying we haven't issued bonds
[1:19:48]
yet, and so we're going
[1:19:50]
out and issuing bonds
[1:19:51]
to be able
[1:19:52]
to fund these critical projects
[1:19:54]
for LAWA.
[1:19:55]
You can see here,
[1:19:57]
and I think it's important
[1:19:58]
for you all to know
[1:20:01]
particularly what these
[1:20:03]
projects represent.
[1:20:05]
So,
[1:20:06]
terminal 5 renovation and
[1:20:07]
reconstruction.
[1:20:09]
Last, I think last board
[1:20:11]
meeting, Hans came and gave you
[1:20:12]
guys a really fantastic
[1:20:13]
presentation showing you the
[1:20:15]
direction of where T5 is headed
[1:20:17]
and what that renovation and
[1:20:19]
reconstruction projects
[1:20:21]
ultimately will achieve.
[1:20:23]
So part of the bonds that we're
[1:20:25]
issuing now,
[1:20:27]
about almost a billion
[1:20:28]
of that, will go to continue
[1:20:30]
to fund that project.
[1:20:33]
Our Tibbet optimization, that
[1:20:37]
project, basically our refresh
[1:20:39]
of Tibbet.
[1:20:41]
We'll be using bonds, the bond
[1:20:43]
proceeds, I should say,
[1:20:44]
to make sure that we continue
[1:20:46]
to move that project forward.
[1:20:48]
And then we have our central
[1:20:49]
terminal area curbside.
[1:20:51]
I probably should have brought
[1:20:52]
some pictures here because I
[1:20:54]
think pictures say a thousand
[1:20:55]
words.
[1:20:56]
But making sure that we are
[1:20:58]
doing,
[1:20:59]
making those improvements.
[1:21:01]
to the functionality
[1:21:02]
of our departure curbs,
[1:21:03]
improving the canopies,
[1:21:05]
the lighting elements, and just
[1:21:07]
really bringing together a
[1:21:09]
better look and feel
[1:21:10]
for the airport.
[1:21:12]
And then also
[1:21:13]
on the arrivals,
[1:21:14]
we're upgrading crosswalks,
[1:21:16]
lighting, loading zones,
[1:21:18]
and landscaping.
[1:21:20]
And then I'll say,
[1:21:22]
on the roadway improvements,
[1:21:24]
John mentioned the ATMP.
[1:21:27]
A little bit earlier,
[1:21:28]
I actually had a chance to go
[1:21:29]
to the showcase room and see
[1:21:31]
all the great work that they've
[1:21:33]
done there.
[1:21:34]
And the roadways are going
[1:21:35]
to be amazing.
[1:21:36]
I mean, it's just going
[1:21:37]
to be a game changer, I think,
[1:21:38]
for the way people move in and
[1:21:39]
out of LAX. So very excited
[1:21:43]
about that and excited
[1:21:44]
to be a part
[1:21:45]
of raising the capital
[1:21:46]
to be able
[1:21:47]
to fund these projects.
[1:21:48]
Then we're going
[1:21:50]
to do a refunding.
[1:21:51]
And again, all included
[1:21:52]
in the $3 billion.
[1:21:54]
We've got...
[1:21:56]
When we issue bonds, we have an
[1:21:59]
opportunity when the market
[1:22:01]
presents itself
[1:22:02]
to actually refinance some
[1:22:04]
of those bonds
[1:22:05]
to achieve lower debt service,
[1:22:08]
just like a mortgage,
[1:22:09]
if you will.
[1:22:10]
You refinance your mortgage,
[1:22:12]
you get lower payments.
[1:22:14]
And so, we take advantage
[1:22:15]
of that as well.
[1:22:16]
So, we have a couple of series
[1:22:18]
in here that we've identified
[1:22:20]
that we think are really good
[1:22:21]
candidates for us to improve or
[1:22:24]
achieve some savings
[1:22:26]
in terms of the debt service
[1:22:28]
payments that we'll be making
[1:22:29]
going forward.
[1:22:30]
Those will be market dependent
[1:22:32]
day to day.
[1:22:33]
When we actually go out in
[1:22:35]
August to price the bonds, we
[1:22:37]
have a rule that if the net
[1:22:42]
present value savings or what
[1:22:43]
we can lower our payments
[1:22:45]
by doesn't achieve
[1:22:46]
at least a 3% rate,
[1:22:49]
then we have a target.
[1:22:50]
Then we won't do the deal
[1:22:52]
because it just economically
[1:22:53]
doesn't make sense for us
[1:22:54]
to do so.
[1:22:55]
So right now those bonds,
[1:22:56]
we run
[1:22:58]
in some analysis and it looks
[1:22:59]
like they're right
[1:23:00]
around the three,
[1:23:01]
three and a half percent.
[1:23:03]
But we also put in a little
[1:23:05]
conservative cushion there just
[1:23:06]
to make sure that when market
[1:23:08]
conditions change,
[1:23:09]
we got a little buffer
[1:23:10]
in there, about 50 bases
[1:23:11]
points.
[1:23:12]
But that'll be kind of market
[1:23:14]
dependent once we know better
[1:23:17]
what's happening when we go
[1:23:19]
to the market in August.
[1:23:22]
And that comprises...
[1:23:24]
the $3 billion.
[1:23:28]
I think I've talked
[1:23:29]
through most of this, but just
[1:23:31]
to again give you all another
[1:23:32]
snapshot, I think the important
[1:23:34]
point here when we think about
[1:23:37]
the capital program and the
[1:23:39]
$15 billion over the next 10
[1:23:42]
years, I just note that
[1:23:44]
over the next five years
[1:23:46]
in this period of time, 26
[1:23:48]
through 30, that we're looking
[1:23:50]
at issuing or we have project
[1:23:53]
cost expenses that are about
[1:23:54]
12 billion.
[1:23:56]
And the way we plan
[1:23:57]
to finance that 12 billion over
[1:23:59]
the next five years is broken
[1:24:00]
down on the left-hand side.
[1:24:02]
Again, we'll go out and we'll
[1:24:04]
do some debt financing.
[1:24:06]
There'll be some LAWA cash that
[1:24:09]
we have available
[1:24:10]
for capital projects.
[1:24:11]
And then we'll also have some
[1:24:13]
grant opportunities as well,
[1:24:16]
close to about 700 million.
[1:24:18]
Again,
[1:24:19]
over that five-year period.
[1:24:21]
So I always like to
[1:24:22]
characterize this as that's
[1:24:23]
our,
[1:24:24]
that's a public agency's
[1:24:25]
version
[1:24:26]
of what a capital stack is,
[1:24:27]
right?
[1:24:28]
That's how we're funding these
[1:24:29]
capital projects.
[1:24:34]
And then I'll leave you
[1:24:36]
with what that means when we go
[1:24:38]
out and we put more debt
[1:24:40]
on the books.
[1:24:41]
What does that do to our
[1:24:42]
coverage ratios and what does
[1:24:44]
that do to our cost
[1:24:45]
of employment?
[1:24:46]
So just important for you
[1:24:47]
to see that we have actually
[1:24:49]
for 27 included those costs in.
[1:24:52]
And when we spend time with our
[1:24:54]
investors and the rating
[1:24:55]
agencies, they always want to
[1:24:57]
know that we're reflecting what
[1:24:59]
we expect to issue.
[1:25:01]
And then over time, what we're
[1:25:02]
forecasting our funding needs
[1:25:05]
would be particularly
[1:25:06]
on the leverage side.
[1:25:08]
So I just want to remind you
[1:25:09]
of that.
[1:25:13]
Question on this slide.
[1:25:17]
How does it compare
[1:25:18]
to other airports?
[1:25:19]
on the cost per?
[1:25:22]
Good question.
[1:25:23]
So, I would say for 27, and I
[1:25:28]
want to be careful
[1:25:29]
about this, just in terms
[1:25:31]
of benchmarking us to say
[1:25:34]
West Coast airports and then
[1:25:36]
large hub airports, right?
[1:25:39]
So for 27, where I understand
[1:25:44]
and have looked at different
[1:25:46]
airports whether it's Chicago
[1:25:48]
or whether it's where John came
[1:25:50]
from, DFW, Atlanta, and New
[1:25:53]
York, we're right there
[1:25:55]
in the same category
[1:25:57]
with these,
[1:25:58]
with these airports.
[1:25:59]
What is, what is important
[1:26:01]
to note is that once we get
[1:26:03]
through our fifteen billion
[1:26:04]
dollar capital program where we
[1:26:06]
will land and I would say that
[1:26:08]
we would be probably
[1:26:10]
at the top
[1:26:11]
of those large hub airports.
[1:26:14]
But I want to be careful about
[1:26:16]
that because we all have
[1:26:17]
different sizes and levels of
[1:26:19]
capital programs that might
[1:26:21]
shift those costs, right?
[1:26:23]
So I just want
[1:26:25]
to be really careful
[1:26:26]
about that.
[1:26:27]
And then with this formula,
[1:26:30]
you know,
[1:26:31]
how we calculate cost per
[1:26:32]
employment, just remember the
[1:26:35]
denominator is driven
[1:26:37]
by the number
[1:26:38]
of in plane passengers,
[1:26:40]
right?
[1:26:41]
And so, that changes too.
[1:26:42]
So, sometimes it's not just an
[1:26:43]
apples to apples,
[1:26:44]
but as a large hub airport,
[1:26:46]
given the size
[1:26:47]
of our capital program,
[1:26:49]
we are actually like right
[1:26:51]
within that sweet spot,
[1:26:53]
I would say over the next for
[1:26:55]
27 and 28.
[1:26:56]
And then we start
[1:26:57]
to get a little higher as we go
[1:26:58]
out in terms of being one
[1:27:00]
of the higher large hubs.
[1:27:03]
And I'll bring,
[1:27:04]
I can follow up with,
[1:27:06]
I'd be happy to follow up with
[1:27:07]
you and show you
[1:27:08]
some comparisons because we
[1:27:10]
actually do track that.
[1:27:11]
Okay, thank you.
[1:27:15]
Other comments, questions?
[1:27:18]
Are you finished?
[1:27:21]
Pretty much.
[1:27:23]
So next steps,
[1:27:25]
I just want you all
[1:27:26]
to have a sense
[1:27:27]
of what happens after this.
[1:27:28]
So we are meeting
[1:27:31]
with the rating agencies on
[1:27:32]
Monday with the expectation
[1:27:34]
within the week or two
[1:27:36]
after that.
[1:27:37]
We will get a rating, and
[1:27:38]
certainly our expectation is
[1:27:40]
that we will continue
[1:27:41]
to be a AA-rated credit, one
[1:27:45]
of the highest in the country
[1:27:47]
for airports.
[1:27:48]
Have we always been AA-rated?
[1:27:51]
In the past, I'll say five,
[1:27:53]
ten years, yes.
[1:27:54]
But yes, yes.
[1:27:55]
Thank you.
[1:27:56]
Thank you, Marla.
[1:27:57]
Thank you.
[1:27:58]
And then we will go out.
[1:28:01]
The documents that you all will
[1:28:03]
be approving today will be
[1:28:05]
fine...
[1:28:06]
finalizing those and putting
[1:28:07]
those out to the market
[1:28:09]
for investors to review,
[1:28:11]
have some investor meetings,
[1:28:13]
and then the week
[1:28:14]
of the 18th, we will go to
[1:28:16]
New York and price the bonds.
[1:28:19]
And then close,
[1:28:20]
the expected close is
[1:28:21]
September 2nd.
[1:28:28]
So I am asking
[1:28:30]
for authorization
[1:28:33]
to issue the senior revenue and
[1:28:35]
refunding revenue bonds
[1:28:36]
for series 26 and an amount not
[1:28:38]
to exceed $3 billion and also
[1:28:41]
asking for your approval of the
[1:28:42]
financing documents as outlined
[1:28:45]
here on this on the slide.
[1:28:49]
Thank you so much for all of
[1:28:50]
your hard work and the teams.
[1:28:52]
I know that so much goes
[1:28:53]
into all of this and we
[1:28:56]
appreciate that.
[1:28:57]
So, the refunding of the older
[1:29:01]
bond. So, it's a 2.8, right?
[1:29:03]
Total 2.8, right?
[1:29:05]
Yes.
[1:29:07]
So, out of the 2.8, you said how
[1:29:08]
much was new money versus the
[1:29:12]
remainder would be the
[1:29:13]
refunding of the commercial
[1:29:14]
paper and the refunding
[1:29:15]
of the older bonds
[1:29:17]
for favorable rate?
[1:29:18]
Yeah.
[1:29:19]
So $2 billion.
[1:29:21]
is the new money, which also
[1:29:23]
includes the repayment
[1:29:26]
of the commercial paper.
[1:29:27]
And then the refunding is
[1:29:30]
somewhere around $750 million.
[1:29:32]
Okay, and those are the 2016
[1:29:35]
bonds?
[1:29:36]
2016 bonds and potentially,
[1:29:38]
if it makes sense for us
[1:29:39]
to do so, the 2019 and 2010
[1:29:43]
Build America bonds,
[1:29:44]
so the BABs bonds.
[1:29:47]
Okay, okay.
[1:29:51]
And then the authorization that
[1:29:53]
was originally given up to $9
[1:29:54]
billion,
[1:29:55]
so this is a tranche and you
[1:29:57]
may be coming back to us
[1:29:58]
for additional bond approval?
[1:30:00]
Like this is an ongoing
[1:30:01]
process?
[1:30:03]
Yes, coming back for approval
[1:30:05]
to issue more bonds and also
[1:30:08]
potentially coming back to ask
[1:30:09]
for additional authority,
[1:30:11]
right, up to the $9 billion.
[1:30:13]
So, yes, we will be back
[1:30:14]
in the spring.
[1:30:17]
Great.
[1:30:18]
Thank you.
[1:30:19]
Okay.
[1:30:20]
Also, this could be a
[1:30:21]
ticky-tacky point
[1:30:22]
of clarification,
[1:30:23]
but I think we're a combination
[1:30:26]
of a hub and O&D airport,
[1:30:27]
really,
[1:30:28]
and I think we're mostly known
[1:30:29]
for O&D,
[1:30:30]
but you're comparing us to the
[1:30:32]
hubs because we have so many
[1:30:33]
flights in and out, but
[1:30:35]
typically we're categorized as
[1:30:37]
O&D.
[1:30:38]
Yes, you are characterized as
[1:30:40]
O&D, or yes,
[1:30:42]
we are characterized as O&D,
[1:30:45]
and our O&D traffic is
[1:30:46]
about 85%. and just put it in
[1:30:49]
context.
[1:30:51]
I did mention just the
[1:30:52]
comparison across the West
[1:30:54]
Coast and I think the other
[1:30:57]
West Coast airport,
[1:30:58]
but clearly not size in terms
[1:31:00]
of employment, no comparison,
[1:31:03]
is Portland International,
[1:31:04]
which is also primarily
[1:31:07]
on the West Coast and an OND
[1:31:09]
hub and their CPE is hovering
[1:31:11]
around $30, right?
[1:31:15]
And they, LAX is two and a half
[1:31:17]
times the size.
[1:31:23]
I just wanted
[1:31:24]
to say thank you also for
[1:31:25]
noting all the numerous
[1:31:26]
professionals who are carefully
[1:31:27]
and thoughtfully been part
[1:31:29]
of the LAWA team.
[1:31:30]
That was something that was
[1:31:31]
important to some
[1:31:32]
of the board members here.
[1:31:34]
You know how hard you folks
[1:31:35]
work and your team
[1:31:36]
to put this together.
[1:31:37]
This is a large amount
[1:31:38]
of money.
[1:31:39]
I know Hans is happy about this
[1:31:41]
motion because he was here last
[1:31:42]
time.
[1:31:44]
But I just want to say thank
[1:31:45]
you for all the hard work and
[1:31:47]
due diligence that you've done
[1:31:48]
in explaining the process.
[1:31:50]
That's terrific,
[1:31:51]
and thank you.
[1:31:52]
Thank you.
[1:31:53]
Thank you.
[1:31:54]
Thank you for your support.
[1:31:55]
Yeah.
[1:31:59]
Any other comments or
[1:32:00]
questions?
[1:32:01]
Great.
[1:32:02]
Could I have a motion to
[1:32:03]
approve item number 18?
[1:32:04]
I will make a motion.
[1:32:05]
Second.
[1:32:06]
Thank you, Commissioners La
[1:32:07]
Bau and Roxborough.
[1:32:09]
All those in favor,
[1:32:10]
please say aye.
[1:32:11]
Aye.
[1:32:12]
Any opposed?
[1:32:14]
Thank you very much.
[1:32:15]
Thank you.
[1:32:16]
And welcome again,
[1:32:17]
Commissioner Daniel.
[1:32:22]
Before we go
[1:32:23]
into closed session,
[1:32:29]
are there any speakers
[1:32:30]
on the closed session item?
[1:32:32]
Yes, Madam Chair, we have two.
[1:32:38]
Sorry, not closed session.
[1:32:40]
Thank you.
[1:32:41]
I understand that there are
[1:32:42]
late arrivals who would want to
[1:32:43]
provide general comments.
[1:32:45]
I would like
[1:32:46]
to entertain those
[1:32:47]
before we go
[1:32:48]
into closed session, but please
[1:32:49]
be reminded that we have a
[1:32:50]
comment period for general
[1:32:51]
comments as per the order
[1:32:52]
of business listed
[1:32:53]
on the agenda.
[1:32:56]
Madam Secretary, how many
[1:32:57]
speakers are there?
[1:32:59]
We have two.
[1:33:01]
Let's please give each speaker
[1:33:02]
two minutes.
[1:33:03]
Please call the speakers up.
[1:33:05]
Could I please request the
[1:33:06]
following two speakers
[1:33:07]
to line up by the windows
[1:33:10]
in the order I call
[1:33:11]
out your name?
[1:33:14]
Mar?a Mendon and Glenda Rico.
[1:33:35]
Maria Mendon please step up to
[1:33:37]
the lectern, state your name and
[1:33:40]
your comments.
[1:33:45]
Buenos d?as, mi nombre es
[1:33:48]
Mar?a Rendon. He trabajado para
[1:33:51]
Flying Food por cerca de 20
[1:33:53]
a?os.
[1:33:56]
Yo nunca eh tenido ni un
[1:33:57]
problema con la compa?a, pues
[1:34:01]
desde, mis a?os de trabajo lo
[1:34:03]
comprueba. La compa?a nunca ha
[1:34:06]
sido mala conmigo. Es una buena
[1:34:08]
compa?a, si a m? la compa?a me
[1:34:11]
robara mi salario no estar?a ay
[1:34:14]
trabajando. En segunda, he
[1:34:17]
sufrido tanto acoso y agresi?n
[1:34:21]
por parte de los lideres
[1:34:22]
sindicales que hasta el momento
[1:34:24]
tuve que pedir mi cambio de mi
[1:34:28]
?rea de departamento porque es
[1:34:31]
demasiado la presi?n que tengo
[1:34:34]
ay por parte de los compa?eros,
[1:34:37]
y no todos,
[1:34:39]
algunos son buenos. Desde las
[1:34:43]
condiciones de mi ?rea de
[1:34:44]
trabajo pues se supone que
[1:34:46]
nosotros como trabajadores
[1:34:48]
tenemos que mantener nuestra
[1:34:49]
?rea limpia. Algunos le echan
[1:34:52]
la culpa a la compa?a, no es
[1:34:54]
culpa de la compa?a que el
[1:34:55]
departamento este sucia, es
[1:34:58]
culpa de nosotros mismos porque
[1:35:01]
los compa?eros tenemos que
[1:35:03]
limpiar nuestra ?rea. No tengo
[1:35:07]
nada m?s que decir. Muchas
[1:35:09]
gracias por atenderme. Gracias.
[1:35:20]
Thank you. Glenda Rico,
[1:35:24]
please step up to the lectern
[1:35:26]
and provide your comments. Thank
[1:35:27]
you.
[1:35:29]
Buenos d?as a
[1:35:30]
todos los presentes. Mi nombre
[1:35:31]
es Glenda Rico y trabajo en el
[1:35:34]
departamento de frutas. Llevo
[1:35:37]
24 a?os trabajando ah?.
[1:35:39]
Durante mis a?os,
[1:35:40]
es una compa?a excelente,
[1:35:42]
llena de oportunidades. Y lo
[1:35:45]
triste que estoy pues de ver
[1:35:48]
tantas cosas contrarias a la
[1:35:50]
compa?a. Si fuera mala, no
[1:35:52]
estuviera trabajando por tantos
[1:35:54]
a?os. Gracias a Dios, mis hijas
[1:35:56]
ahora se han graduado. Y le doy
[1:35:58]
gracias a la compa?a porque me
[1:36:00]
ha dado un empleo, una
[1:36:02]
estabilidad donde yo he podido
[1:36:05]
ayudar a mis hijas a estudiar y
[1:36:07]
graduarse. Y hay muchas
[1:36:09]
familias que dependemos de
[1:36:10]
ello, y no entiendo por qu?
[1:36:12]
dicen que es una mala compa?a.
[1:36:14]
A veces no queremos seguir las
[1:36:15]
reglas, reglas que tenemos que
[1:36:17]
seguir, y hay gente que no le
[1:36:19]
gusta seguir las reglas. No es
[1:36:21]
la compa?a. A veces somos
[1:36:23]
nosotros los mismos empleados
[1:36:25]
que no nos gusta seguir reglas.
[1:36:27]
Entonces no es la compa?a. La
[1:36:29]
compa?a ofrece el trabajo,
[1:36:31]
ofrece las reglas,
[1:36:33]
y dice desde un principio,
[1:36:34]
que uno se mete a trabajar, te
[1:36:38]
da el manual y te dice qu?
[1:36:41]
hacer y qu? no hacer. A veces
[1:36:43]
no nos gusta seguir las reglas,
[1:36:44]
pero la compa?a es excelente y
[1:36:46]
est? llena de oportunidades.
[1:36:48]
Gracias.
[1:36:59]
Any additional speakers?
[1:37:02]
No Madam Chair.
[1:37:08]
I'd
[1:37:09]
like to pass it over to the
[1:37:10]
City Attorney before we break
[1:37:11]
into closed session.
[1:37:12]
Just to clarify, Madam Chair,
[1:37:15]
general public comment is now
[1:37:16]
closed after being reopened.
[1:37:18]
Thank you.
[1:37:20]
Vice President Aramayo,
[1:37:21]
the board will now go
[1:37:22]
into closed session
[1:37:24]
to discuss items listed
[1:37:25]
on the closed session agenda.
[1:37:27]
We will then go back
[1:37:28]
into open session
[1:37:29]
to report back
[1:37:30]
on any actions taken
[1:37:31]
in that closed session.
[1:37:34]
Thank you.
[1:40:22]
Board has returned
[1:40:23]
from closed session.
[1:40:24]
Does the city attorney
[1:40:25]
have anything to report?
[1:40:27]
Thank you, Vice President
[1:40:28]
Aramayo.
[1:40:29]
No, there's
[1:40:30]
nothing to report
[1:40:31]
from closed session.
[1:40:32]
Thank you.
[1:40:33]
And does any commissioner wish
[1:40:34]
to request items
[1:40:35]
for future calendaring?
[1:40:38]
Did any commissioner
[1:40:39]
participate in a LAWA
[1:40:40]
related event and wish to
[1:40:41]
share information about it?
[1:40:43]
I did yesterday. I
[1:40:44]
participated in the LA
[1:40:45]
Current Affairs Forum. I was
[1:40:48]
there, and also Aaron Trapp and
[1:40:50]
Nicole Carsell were there. The
[1:40:52]
keynote speaker was
[1:40:53]
Councilmember Emeritus Paul
[1:40:55]
Krikorian, and he's educated
[1:40:58]
us,
[1:40:59]
made a very good presentation.
[1:41:01]
He's now the Executive Director
[1:41:03]
of the Office of the Mayor's
[1:41:05]
Events for the city of Los
[1:41:06]
Angeles. So, he gave us a really
[1:41:08]
great insight
[1:41:09]
about what the mayor is doing
[1:41:11]
to get ready
[1:41:12]
for and what our city is doing
[1:41:13]
to get ready for the
[1:41:14]
Olympics. Very good event.
[1:41:17]
Thank you. Any others? Our next
[1:41:21]
board meeting is scheduled
[1:41:22]
for Thursday, August 27, 2026
[1:41:24]
at 10 a.m. That completes our
[1:41:26]
business for today. This
[1:41:28]
special meeting is adjourned.