[4:13]
join me in the pledge of allegiance.
[4:18]
I pledge allegiance to the flag of the
[4:20]
United States of America and to the
[4:22]
republic for which it stands, one nation
[4:25]
under God, indivisible, with liberty and
[4:28]
justice for all.
[4:32]
Kim, if you would take note that two of
[4:35]
the supervisors are here
[4:38]
unsure of Ben's whereabouts.
[4:41]
Uh we're going to start off with the
[4:43]
induction of our new chief. Um just have
[4:47]
a few words to say. Uh today we're proud
[4:50]
to formally swear in Justin Cyel as the
[4:52]
permanent chief of police for Lanster
[4:54]
Township. Uh, Chief Cyel has served with
[4:57]
distinction as our acting chief since
[4:59]
January, providing steady and effective
[5:02]
leadership during the critical early
[5:04]
stages of establishing our independent
[5:06]
police department.
[5:08]
His commitment to professionalism,
[5:10]
community safety, and departmental
[5:12]
growth has been instrumental in building
[5:14]
a strong foundation for the Langster
[5:16]
Township Police Department. With
[5:18]
extensive law enforcement experience and
[5:20]
a proven track record of dedicated
[5:22]
service, including his roles as
[5:23]
successful in the successful launch of
[5:25]
our new department, Chief Cyel is
[5:27]
exceptionally wellqualified to guide our
[5:29]
officers and continue prioritizing the
[5:32]
protection and well-being of our
[5:34]
residents. His promotion to permanent
[5:36]
chief reflects the confidence of the
[5:39]
board of supervisors and his vision,
[5:41]
integrity, and ability to lead our
[5:43]
department into the future. We look
[5:45]
forward to the continued success of the
[5:47]
Langster Township Police Department
[5:50]
under his leadership.
[5:52]
Now, for a little swearing in
[6:00]
over here,
[6:03]
» Raise your right. logo behind you. It
[6:05]
might be a nice spot there.
[6:06]
» There we go. Raise your right hand. I,
[6:10]
Justin Cable, do solemnly swear
[6:13]
» I, Justin Cyel, do solemnly swear
[6:15]
» That I will support, obey, and defend
[6:17]
the Constitution of the United States
[6:19]
» That I will support, obey, and defend
[6:21]
the Constitution of the United States
[6:23]
» And the Constitution and laws of the
[6:25]
Commonwealth of Pennsylvania
[6:26]
» And the Constitution and laws of
[6:29]
Pennsylvania.
[6:30]
that I will discharge the duties of my
[6:32]
office as chief of police with fidelity.
[6:35]
» That I will discharge my duties as chief
[6:37]
of police with fidelity.
[6:39]
» Will uphold, obey, and enforce the law
[6:42]
without consideration.
[6:44]
» Will uphold, obey, and enforce the law
[6:47]
without consideration
[6:48]
» To a person's race, color, sex,
[6:51]
religious creed
[6:53]
» To a person's race, sex, religion, or
[6:56]
religious creed. color, orientation,
[7:00]
age.
[7:01]
» Color, orientation, or age.
[7:03]
» National origin, ancestry, or
[7:05]
disability.
[7:06]
» National origin, ancestry, or
[7:08]
disability.
[7:09]
» And that I will obey the rules,
[7:11]
regulations, and policies and
[7:12]
procedures.
[7:14]
» And that I will obey the rules,
[7:15]
regulations, policies, and procedures
[7:17]
» Governing the Lancaster Township Police
[7:19]
Department.
[7:20]
» Governing the Lancaster Township Police
[7:21]
Department. Congratulations.
[7:52]
It's okay. Nobody's watching.
[8:13]
Watch your
[8:23]
exit. Congrats again. Thank you. If you
[8:27]
guys all want to go outside, take some
[8:28]
pictures and Okay. Thank you.
[8:58]
I'm
[9:13]
All right, continuing. Uh, do we have
[9:15]
any public comment on agenda items?
[9:18]
Agenda items only at this point.
[9:22]
None.
[9:23]
Secretary report
[9:35]
uh fund balances for May uh 8,700,694.98
[9:44]
uh for the general fund investment escro
[9:46]
and liabilities. The Highway 8 fund
[9:48]
1,488,565.554.
[9:52]
The Capital Reserve Fund 1,87,1345
[9:58]
for a total made balance of
[9:59]
11,996,273.97.
[10:05]
» We will file that for audit bills.
[10:08]
» Uh monthly bills, uh general fund total
[10:12]
$459,26.86.
[10:15]
86
[10:16]
escrow fund total $2,69.32
[10:20]
state highway fund $16,743.50
[10:25]
capital reserve fund total zero for
[10:28]
total bills of $478,55968.
[10:34]
I make a motion that we pay the bills.
[10:36]
» Second. It's been moved and seconded
[10:38]
that we pay the bills. All those in
[10:40]
favor signify by saying I.
[10:43]
» I. I. Moving on to reports. Uh Lafayette
[10:47]
Fire Company
[10:49]
covers the east side of the township.
[10:51]
The uh we did not have their report for
[10:54]
May available for this meeting. Uh
[10:57]
Langster Township Fire Chief. Uh 32
[11:01]
calls for the month. Uh one call of
[11:04]
significance. We had a gas explosion on
[11:06]
Chadwick Circle. Um originally came in
[11:08]
as the uh homeowner reporting that the
[11:11]
hot water heater had been blown up. uh
[11:13]
we got there and determined that was not
[11:15]
the case. The uh was quite impressive.
[11:18]
The uh structure itself sustained
[11:20]
significant damage. The homeowner was
[11:22]
alive and out front with a neighbor. Um
[11:25]
she was in the basement of that
[11:27]
structure when the explosion happened.
[11:29]
Um the hot water heater was intact. So
[11:31]
there was a there was a gas leak that
[11:33]
occurred and some ignition source and it
[11:36]
found its way to an ignition source and
[11:38]
exploded. Um township codes did come out
[11:41]
and take a look at it. So, we appreciate
[11:43]
their help. Uh, as far as you know, she
[11:45]
is, uh, last known condition is she's
[11:46]
still alive. She was taken to LGH with
[11:49]
burns to the face and legs and then
[11:51]
transferred to Lehigh Burn Center. Um,
[11:54]
we had one firefighter that was injured
[11:56]
trying to get a cat. Cat bit him out of
[11:58]
an abundance of caution. We sent him for
[12:00]
evaluation and, uh, the paperwork was
[12:02]
submitted to the township office. Um,
[12:06]
our rescue continues to be out of
[12:08]
service this week. Uh it's in the body
[12:10]
shop getting some minor body repair done
[12:13]
from a accident that that had occurred a
[12:16]
few months ago. Um in previous meetings
[12:19]
I talked about some of our training and
[12:22]
u we had four personnel successfully
[12:25]
pass their national registry EMT test.
[12:28]
Uh we still have one that is testing
[12:29]
this week. Um
[12:33]
the fire department is now set up with
[12:35]
NOX. the the township has a uh a
[12:38]
voluntary voluntary
[12:41]
um program with Knox that uh businesses
[12:44]
can can request one. Um we are now set
[12:48]
up online with a self-service ordering
[12:51]
function so that those uh those
[12:53]
individuals wishing to get a Knox can do
[12:55]
so online. They don't need to fill out
[12:57]
the old paper forms anymore. So um
[13:00]
that's all I have. Any questions for me?
[13:03]
» None for me. Thank
[13:05]
» Thank you.
[13:07]
Uh recycling report for April uh 20.84%
[13:13]
safety committee meeting safety
[13:15]
committee meeting minutes uh sewer
[13:17]
reports Lassa and SLassa printed copies
[13:20]
are available township office for a
[13:22]
nominal fee to view and printed on the
[13:24]
website.
[13:26]
Workshop reports planning and zoning.
[13:28]
» Can we pump Sergeant Carpenter up so he
[13:30]
can go join it?
[13:31]
» Yeah, we could definitely do that. Let's
[13:32]
go to the police court. All right. Uh,
[13:35]
for the month of May, we had 433 calls
[13:39]
for service. We had 26 vehicle crashes,
[13:43]
157 traffic enforcement stops, 84
[13:46]
traffic citations issued, 10 written
[13:49]
traffic warnings issued, 63 verbal
[13:51]
traffic warnings issued, 18 misdemeanor
[13:55]
felony offenses, three DUI arrests, six
[13:58]
non-traffic citations issued, zero auto
[14:02]
thefts, and 55 vehicle steering wheel
[14:05]
locks were issued year to date. Uh in
[14:08]
response to resident complaints,
[14:09]
officers continued to conduct speed
[14:11]
enforcement throughout the township. Um
[14:14]
officers participated in career day uh
[14:17]
hosted by the school district of
[14:19]
Lancaster where they displayed patrol
[14:21]
vehicles and equipment and engaged with
[14:23]
students at Burough's elementary school.
[14:26]
We have currently transitioned our
[14:30]
report writing system from the Cody's
[14:32]
record 6 to the new Cody's uh pathfinder
[14:35]
which is web- based. Um and with our
[14:38]
annual training officers completed uh
[14:40]
their mandatory inservice training
[14:42]
modules for 2026. Half of the department
[14:45]
completed firearm qualifications and
[14:47]
first aid training. The remaining
[14:48]
officers will complete uh this training
[14:51]
in June.
[14:52]
And we have a open position posted till
[14:55]
the end of the month.
[14:56]
» Correct.
[14:59]
» Hey, thank you.
[15:00]
» You're excused.
[15:07]
» Now, Mr.
[15:09]
» Thank you.
[15:11]
Um, so the grass violations are piling
[15:15]
up. Uh, the growing season is well upon
[15:18]
us. Uh we've actually gotten to the
[15:20]
point I think we've mowed uh three
[15:22]
properties now with two of them just
[15:24]
being today. Uh so for a total of three
[15:26]
so far this year.
[15:29]
Uh and those are properties that we've
[15:31]
given the the polite nice letter saying
[15:34]
hey maybe you forgot the miller grass uh
[15:37]
and that went on to a notice of
[15:39]
violation and that was still ignored and
[15:41]
we've gotten to the point where we've
[15:42]
had to take action. So just a little
[15:44]
background there. Uh I don't have a
[15:46]
number for you off the top of my head.
[15:48]
We're uh we are using um for code
[15:51]
violations. We're using uh the new uh
[15:53]
computer system tracer for that. Uh
[15:56]
we're still learning some of the
[15:57]
reporting features of that to be able to
[15:59]
to split out just the grass violations.
[16:02]
I haven't just haven't quite figured
[16:03]
that out yet. So, uh but they're they're
[16:06]
rolling in pretty regularly with the
[16:07]
grass storm. And then uh the fire chief
[16:10]
already stole some of my thunder with
[16:12]
the the uh explosion at the house. Uh it
[16:16]
was uh it was rather uh I don't know if
[16:19]
impressive was a good word to use for
[16:20]
it, but it was really amazing what uh
[16:23]
the force of that explosion did to the
[16:25]
to the house itself, the structure. Uh
[16:28]
it was pretty clear even to a
[16:30]
nonstructural engineer guy like myself
[16:32]
that this house wasn't safe to to keep
[16:35]
people in. So we did condemn that. Uh I
[16:37]
did actually speak to the resident um I
[16:40]
think it was that following Monday. Uh I
[16:42]
had contact with her and and met her in
[16:45]
person then uh to talk about some
[16:47]
concerns she had. Uh she was out of the
[16:50]
hospital obviously at that point but uh
[16:52]
last I heard she was doing well. I
[16:54]
haven't heard from her since then but uh
[16:55]
she was doing well relatively at that
[16:58]
time. So uh that's all I have for you
[17:01]
questions for me. Uh
[17:05]
if memory serves me correct, uh based on
[17:08]
the photos that I saw from the incident,
[17:11]
the property that is right that is
[17:15]
literally right there next to
[17:19]
the property that almost floated was
[17:21]
under construction as well.
[17:23]
» Uh they are doing
[17:25]
» Or they were like
[17:26]
» Currently doing some uh siding, maybe a
[17:30]
roof.
[17:30]
» Okay. Uh, and then I think they have
[17:33]
some plans to do some other work, but
[17:35]
they haven't started that yet. It's just
[17:37]
been the to my knowledge just the siding
[17:39]
so far.
[17:41]
» Okay. But like that property was not
[17:43]
» Uh we we
[17:46]
recommended that they get someone maybe
[17:47]
through their insurance company to to
[17:49]
come in and you know take a better look.
[17:51]
Uh someone who's more education and
[17:53]
experience than I have uh for for
[17:56]
judging that. But uh I there was nothing
[17:58]
that stuck out to to myself and even
[18:01]
some of the fire guys uh had taken a
[18:03]
look at it too and and there it seemed
[18:06]
like the blast actually pushed the
[18:07]
opposite side and um so they were pretty
[18:10]
fortunate.
[18:13]
» That's all I got.
[18:14]
» Thank you, sir.
[18:16]
» Township engineer Ben Weber.
[18:19]
» Good evening. Uh we've got several
[18:22]
construction projects that are
[18:24]
continuing on. Southern Village phase 4.
[18:27]
Milligville Apartments is wrapping up.
[18:29]
Wallbank Road Self Storage is wrapping
[18:31]
up. Burrows Elementary should be wrapped
[18:34]
up by the end of the summer. Um, and uh,
[18:38]
the county prison is the largest thing
[18:41]
we have in the in the hopper for
[18:42]
planning processing, but uh, it's
[18:46]
looking like it might be before you at
[18:48]
the July meeting. Um, if it goes through
[18:51]
the planning commission uh, for a
[18:54]
recommendation. Um,
[18:57]
don't have any other real large projects
[18:59]
that have come through the door just
[19:01]
yet. a few small things, but um keeping
[19:04]
up with all of it. It's still a busy
[19:07]
time, so that's all I've got.
[19:11]
» All good. Thank you.
[19:12]
» Public works. Deon,
[19:14]
» Good evening. Um a few things to touch
[19:17]
on on the report here. Uh so we're
[19:19]
continuing to work on the new yard
[19:21]
facility. We just um have some checks
[19:23]
tonight. We signed for resubmitting of
[19:25]
the MPDS permit. Um with that new
[19:28]
update, obviously, like I said, last
[19:29]
month that got a little complicated. we
[19:31]
had to pull that back, do some more
[19:33]
testing and uh and um rework in the
[19:36]
plan. Got that all ready to submit that.
[19:38]
So, um we're we're hopeful to to see
[19:40]
some uh some stuff back here in the next
[19:42]
couple of weeks, two months. Um on that
[19:45]
one, uh we are getting ready to start
[19:48]
the storm water improvements, uh
[19:49]
replacements in the Kensington project.
[19:51]
So, we did our first um Lazak, our our
[19:54]
foreman, did his first complex project
[19:56]
meeting out there uh with all the
[19:58]
parties um and that went off uh very
[20:00]
well. Um brought Kenzie the club um up
[20:03]
to speed with some of their requirements
[20:06]
as a utility owner uh as well cuz they
[20:08]
had private utilities in that
[20:09]
development. So, that was uh good all
[20:12]
the way around. Uh the playground at St.
[20:14]
Joe's is open uh opened May 21st before
[20:17]
Memorial Day, that lovely beautiful
[20:19]
weather weekend we had. Um but luckily
[20:22]
the few weekends after that I've seen
[20:23]
some kids uh playing in there and
[20:24]
they've been uh doing great. Uh the
[20:27]
playgrounds have been doing great. Um
[20:29]
the damage flasher from uh what it we
[20:32]
assume uh to be a dump truck with it up
[20:34]
on New Damble Pike has been repaired. Um
[20:37]
we're ready to submit that for
[20:39]
insurance. Uh and the guys are currently
[20:41]
uh working on Honeysuckle Lane um to
[20:44]
make some improvements to some swim
[20:46]
water out there. Um before you tonight
[20:49]
will be the uh park ordinance that we
[20:51]
had talked about last month. Um
[20:54]
and then uh one last thing before I move
[20:56]
on is we had uh one of our uh staff
[20:59]
members, Tim Heller, uh take and pass as
[21:03]
of Friday. Uh he is now a certified
[21:05]
playground safety inspector. Um which
[21:07]
will help keep all of our playgrounds up
[21:09]
to the safety standards um that we all
[21:13]
but but to the te with the
[21:15]
certification. So, I'm happy to have
[21:17]
that unless you guys have any questions.
[21:20]
» Thank you, sir.
[21:22]
» Township manager.
[21:23]
» Uh, last month uh uh Devin did an
[21:27]
excellent job of talking about the
[21:28]
public works facility and um its history
[21:31]
and the status of uh the current
[21:33]
facility as as it sits. Um if you
[21:36]
recall, we went to bid um last year for
[21:40]
the public works building when we
[21:41]
thought that it was going to come in at
[21:42]
five or six million $6 million. the bids
[21:44]
came in significantly more than that.
[21:47]
It's caused us to go back and um revise
[21:50]
uh the drawings with the eye towards
[21:52]
rebidding and hoping to get a better
[21:54]
price. Um but as uh we go through that
[21:59]
process, we recognize that that while we
[22:01]
may not get to, you know, the nine or
[22:03]
$10 million that we were looking at
[22:05]
before, we're going to end up somewhere
[22:06]
in the middle. So, that's going to make
[22:09]
us have to make or you have to make some
[22:11]
tough decisions about how much of our
[22:12]
reserves we spend. We don't have any
[22:15]
debt in the township, which is a real uh
[22:18]
oddity uh in today's uh local government
[22:21]
scene. So, um we're probably going to
[22:23]
have to take on debt for the first time,
[22:25]
and that may necessitate some increased
[22:27]
tax revenue. Um so, just out out of an
[22:30]
abundance of caution and transparency,
[22:33]
last month we had a report on the old
[22:35]
building. This month I'm gonna ask Devin
[22:36]
to get up now and give a little report
[22:38]
on what the new facility looks like and
[22:40]
how it differs from the old design. And
[22:42]
next month we'll do uh a little
[22:45]
discussion about uh the financing side
[22:47]
of things. Um a lot of times uh we go
[22:51]
through this process and folks come in,
[22:54]
you know, when in January or February or
[22:56]
budget time and and say that they didn't
[22:58]
have a chance to weigh in, that they
[22:59]
hadn't heard anything about this, that
[23:01]
we weren't transparent. not not really
[23:02]
us, but I mean that's the local I mean
[23:04]
that's the that's the typical criticism
[23:06]
of local government. So I want to make
[23:07]
sure although this gets a little tedious
[23:10]
that we give everyone a chance to both
[23:12]
online or in person uh learn about what
[23:14]
we're doing and why uh to weigh in as
[23:16]
part of the process um so that we make
[23:19]
uh a good decision um with as much
[23:22]
public input input as possible. So if
[23:25]
you would
[23:26]
» Great uh thank you. So um just to start
[23:30]
off here I want to do a little bit of
[23:31]
background uh on the next slide about
[23:32]
how we got to this point. So uh just a
[23:35]
comparison here uh 1990s versus today
[23:37]
when when the public works building that
[23:39]
exists today uh was built um uh we had
[23:43]
approximately 40 mi of roadway um and
[23:46]
Gable Park, Wedgewood, Benton Lane uh
[23:48]
were just new uh or being built uh
[23:51]
neighborhoods. Um uh parks were just
[23:54]
starting to be added to the township.
[23:55]
the township didn't even didn't even own
[23:57]
parks back then. Maybe Window Landing in
[23:59]
the '90s was just new with that
[24:01]
development, but even Hamilton Park at
[24:02]
that time was privately owned um by the
[24:05]
the Hamilton Plug Park Club, I think is
[24:08]
what was called.
[24:09]
» Um and Community Park didn't didn't even
[24:11]
exist yet. Um it was a farm to my
[24:14]
knowledge back then. And also the MS4
[24:16]
storm water requirements um were were
[24:18]
not in existence. Um we now have over 50
[24:21]
mi of local road uh five parks with over
[24:24]
100 acres to manage. uh MS4 uh is up and
[24:27]
running and a lot of what we do is based
[24:30]
around that with storm water concerns uh
[24:32]
today. Uh not to mention about a 50%
[24:36]
population increase since n since the
[24:38]
early 1990s. Um and we've highlighted
[24:40]
some of those roads and uh in color
[24:42]
there you can see that not the state
[24:44]
roads in blue, but the reds and yellows
[24:46]
were roads that weren't weren't here
[24:48]
were just recently developing uh when
[24:50]
this the current building was was built.
[24:53]
Um um so just a little example uh of how
[24:58]
that's impacted storage. So just remind
[24:59]
you of that photo and how that
[25:01]
complicates things. Um so just just
[25:04]
taking in mind here with the size of
[25:05]
that building and how that looks um when
[25:08]
we go through the next slide here. Um so
[25:11]
so this is the design for the new
[25:13]
building. Um and the current building
[25:15]
sits in approximately a quarter of this.
[25:18]
So, that tells you the the the the much
[25:21]
needed space that we'll be able to
[25:22]
create. Um uh to uh have uh additional
[25:27]
storage, uh the ability to to to get
[25:30]
vehicles in and out without moving 30
[25:32]
pieces out to get one piece. Um not to
[25:35]
mention just the just the overall safety
[25:37]
of being able to move around freely
[25:38]
without tripping over a trailer hitch or
[25:40]
or or what um whatever may be sticking
[25:43]
out of the back of a truck after a
[25:44]
workday. Um, in addition to that, we'll
[25:48]
have a a separate wash bay, uh, which
[25:50]
will allow us to to wash vehicles and
[25:52]
not get everything else musty and dirty.
[25:55]
Uh, and a mechanics bay, which will will
[25:57]
be separated from the the maintenance
[26:00]
storage area. Um, we'll have uh have
[26:04]
completely separated the the lunchroom
[26:08]
areas, the break room areas, all of
[26:10]
those things, the offices from the
[26:13]
maintenance space, which as most people
[26:16]
know tend to be a little bit more
[26:17]
dirtier uh with some positive air uh
[26:20]
which would would uh negative would
[26:22]
decrease the amount of dust and dirt
[26:23]
that you see in the office spaces and
[26:25]
lunchrooms. And then above that uh which
[26:27]
you can see at the top there is the
[26:30]
mezzanine which would be the
[26:33]
I don't even know how how much more
[26:34]
space it would be. It'll be all of the
[26:36]
dry storage that we have for filters and
[26:38]
recycle bins and all those things that
[26:40]
we just currently have stocked in
[26:42]
storage containers here and there and
[26:44]
everywhere else. Um
[26:47]
and then u and then this is the
[26:49]
oversight plan. Um uh we did um
[26:54]
we had Bill had mention about changing
[26:55]
the the scope of this. Uh we did go
[26:58]
through and and make some changes to
[27:00]
this. So, the original building layout
[27:02]
plan did have uh an excessive overhead
[27:04]
crane throughout it for for mounting
[27:07]
plows and all of those things. Uh we've
[27:09]
completely uh removed that through the
[27:11]
majority of the building with the
[27:12]
exception of the maintenance uh area
[27:14]
where we can use that to to put the
[27:16]
plows and salt spreaders on um and not
[27:19]
need to have that throughout the entire
[27:20]
building which is which was a
[27:22]
substantial cost. Um and in addition to
[27:25]
that by removing the back place uh the
[27:28]
place where the red circle is um which
[27:30]
would uh be additional outdoor storage
[27:32]
and um some vehicle storage for the
[27:36]
police uh which had an excessive amount
[27:38]
of rock removals to be uh to be done
[27:40]
there. Uh by removing that we saved a
[27:43]
lot of money as well and then we we
[27:44]
would move those things off site. Um so
[27:48]
just a couple of things that we looked
[27:49]
at um that substantially decreased the
[27:52]
cost. Um there were there were
[27:54]
oversightes when we talked to the
[27:55]
designers originally. So um so we we
[28:00]
anticipate these changes to save the
[28:02]
project about 1.3 to 1.5 million um and
[28:06]
uh bring the total project cost down to
[28:08]
about 7.8 million to to 8 million. Um uh
[28:11]
like Bill has mentioned before the last
[28:13]
the lowest bids with the last round was
[28:15]
about $9.3 million. So, we're hoping
[28:18]
that these savings, uh, these reductions
[28:21]
can help save the project overall.
[28:24]
So, uh, any questions?
[28:30]
» Great.
[28:30]
» Thank you.
[28:31]
» Thanks.
[28:47]
Tuesday, June 16th, 2026, 7 p.m.
[28:51]
Planning Commission meeting here at
[28:52]
12:40 Maple A. Uh, Tuesday, June 23rd,
[28:56]
2026, 7 p.m. zoning hearing board
[28:58]
meeting here at 12:40 Maple A. The
[29:03]
township office will be closed on
[29:05]
Friday, July 3rd to recognize the July
[29:09]
4th holiday. And our next board of
[29:12]
supervisors meeting will be Monday, July
[29:14]
13th, 2026.
[29:17]
Uh, is there a reason that says 6:30,
[29:19]
not 6?
[29:21]
» Mistake.
[29:22]
» Should be 6.
[29:23]
» 6:00 p.m.
[29:24]
» My bad.
[29:26]
» It's okay. Uh, at at 6 p.m. here at
[29:29]
12:40 Maple Lab.
[29:31]
» Old business.
[29:35]
Uh, ordinance number 2026-04,
[29:38]
ordinance of the township of Lancaster,
[29:40]
Lancaster County, Pennsylvania, adopting
[29:41]
new uh parks, public property, and
[29:44]
recreational space ordinance. Uh, Mr.
[29:48]
Chair, I make a motion that uh that we
[29:51]
approve ordinance number 2026-04,
[29:54]
adopting a new parks, public property,
[29:55]
and recreational spaces ordinance.
[29:58]
» Second. It has been moved and seconded
[30:00]
to approve ordinance number 2026-04.
[30:04]
All those in favor signify by saying I.
[30:06]
» I.
[30:07]
» I.
[30:09]
» Planning and zoning
[30:11]
» Uh LTPC272 Southern Village Phase 4
[30:14]
financial security reduction. Uh I make
[30:16]
a motion that we approve a request from
[30:19]
Dennis uh Del Ro uh Hunter Creek
[30:23]
Builders for a reduction of the
[30:25]
financial security for the southern
[30:26]
village phase force subdivision and land
[30:28]
development plan. Uh this request was
[30:30]
received by township by the township on
[30:32]
April 26, 2026. Uh in his letter dated
[30:36]
May 14, 2026, township engineer Ben
[30:39]
Weber recommended the township approved
[30:41]
the request but only reduce the amount
[30:43]
of the financial security of the
[30:45]
financial security by $55,41863
[30:50]
to a new amount of $2,35,537.93.
[30:55]
» Second. It's been moved and seconded uh
[30:59]
to for the financial security reduction
[31:02]
uh LTPC 272. All those in favor signify
[31:05]
by saying I.
[31:07]
» I.
[31:07]
» I.
[31:10]
» LTPC 311 Lancaster County Correctional
[31:13]
Facility time of extension. I make a
[31:15]
motion that we acknowledge receipt of
[31:17]
the time of extension from David Miller
[31:19]
number two on behalf of the county of
[31:21]
Lancaster until September 30th, 2026.
[31:23]
the approval of the land development
[31:25]
plan for the Lancaster County facility.
[31:27]
» Uh it's just a recognition of the time
[31:30]
extension.
[31:33]
» Uh LTPC 334 1944 Mill Road time
[31:37]
extension. Uh this is just another
[31:40]
acknowledgement of receipt of 3month
[31:42]
time extension from G. David uh Kenir J
[31:45]
D Kenir LLC on behalf of Iris Key for
[31:51]
the approval of the storm water
[31:52]
management site plan for 1944 Mosul
[31:55]
Road.
[31:56]
» That is acknowledged. Moving on to new
[31:59]
business.
[32:01]
» All right. New business. Uh draft
[32:03]
ordinance 2026-05, an ordinance of the
[32:05]
township of Lancaster, Langster County,
[32:08]
Pennsylvania, amending the zoning
[32:09]
ordinance to permit nonpicular
[32:12]
campgrounds in the industrial eye
[32:14]
district by conditional use in the
[32:16]
campus/open space district by special
[32:20]
exception and establishing regulations
[32:22]
and standard for such uses.
[32:26]
» You will direct bill not to advertise.
[32:30]
» Yep. Uh, I'm asking be uh that you guys
[32:33]
direct uh myself and the solicitor to uh
[32:36]
uh to advertise the draft ordinance and
[32:38]
send it to the local uh planning
[32:41]
commission as well as the county
[32:42]
planning commission for review.
[32:44]
» Let's do that.
[32:45]
» Okay.
[32:47]
Resolution
[32:49]
uh 2026-5, a resolution authorizing the
[32:52]
conveyance of certain real estate to
[32:53]
Manor Township and authorizing the
[32:55]
execution of all documents and papers
[32:57]
and the taking of all actions required
[32:59]
and and necessary to actuate the state.
[33:02]
» Uh can uh can um uh after your motion uh
[33:08]
and before you vote, if you can give Ben
[33:10]
an opportunity to weigh in on this, I
[33:12]
think it's useful. Mhm.
[33:14]
» Would you make some motion to just that
[33:18]
number?
[33:18]
» Oh, what the? I'm sorry.
[33:20]
» Number
[33:22]
» The resolution numbering.
[33:23]
» Yeah.
[33:23]
» Oh, 2026-0
[33:26]
something 6.
[33:27]
» You already adopted 05.
[33:29]
» Oh jeez.
[33:30]
» No, that was an ordinance.
[33:32]
» That's ordinance 05. This is resolution
[33:34]
05.
[33:34]
» Okay, I'll calm down.
[33:36]
» Okay,
[33:38]
thanks.
[33:40]
» Make a motion. Um,
[33:43]
I'll make a motion that we approve
[33:44]
resolution 2026-05 authorizing the
[33:47]
conveyance of real estate to Matter
[33:48]
Township and authorizing the execution
[33:50]
of
[33:52]
second.
[33:52]
» Okay. Well, then I'll go ahead and speak
[33:54]
to it then. This is a bit unusual.
[33:56]
There's a there's a uh there's a small
[33:58]
piece of land that's owned by Lancaster
[34:00]
Township in Manor Township on the other
[34:03]
side of the river. My guess is that at
[34:04]
some point or another the river moved
[34:06]
and the earth didn't. Um,
[34:10]
» You want the history on it or no?
[34:12]
» This be enough. And uh, and so we had
[34:15]
hoped to convey this land to Matter
[34:17]
Township because they're over there
[34:18]
mowing it. It's on their side of the
[34:20]
creek. Um, when we when we did the land
[34:22]
development plan for the public works
[34:24]
facility, we were going to convey that
[34:25]
land to them. But, uh, since there's
[34:28]
been a delay in the land development
[34:29]
plan for public works, we still have an
[34:32]
opportunity to do this by resolution.
[34:34]
And, uh, this just tidies up the
[34:35]
borders, conveys the land over to them.
[34:37]
It'll still be a public park. Um, but it
[34:40]
gives them a chance to kind of develop
[34:41]
it on their side the same way we've
[34:43]
developed on our side with with a trail
[34:45]
system, etc., etc.
[34:47]
» All right. It has been moved and
[34:49]
seconded uh to approve resolution
[34:52]
2026-05.
[34:53]
All those in favor signify by saying I.
[34:56]
» I.
[34:57]
» I. Resolution
[34:59]
2026-06,
[35:01]
a resolution uh to consider Lancaster
[35:03]
County's request for a revision of the
[35:05]
township's official sewage facilities
[35:06]
plan to provide for sewage disposal for
[35:09]
new land development of the proposed
[35:11]
Langster County Correctional Facility.
[35:13]
Uh I make a motion that we approve
[35:15]
resolution uh 2026-06.
[35:17]
There is a request by Langster County
[35:19]
for a revision of the official sewage
[35:21]
facilities plan of the township to
[35:23]
provide for a sewage disposal for new
[35:25]
land development of the fosed Lancaster
[35:27]
County commercial correctional facility.
[35:30]
» Second.
[35:31]
Uh it's been moved and seconded to
[35:34]
approve resolution 2026-06.
[35:37]
Uh all those in favor signify by saying
[35:39]
I.
[35:39]
» I.
[35:40]
» I.
[35:42]
» Resolution 2026-07.
[35:44]
a resolution to adopt to I'm sorry to
[35:46]
approve request by Lancaster City for a
[35:49]
multi- municipal joint grant application
[35:52]
to seek funding for potential
[35:53]
improvements to pedestrian and bicyclist
[35:55]
facilities along rank road from Gtown
[35:59]
Road to Rank Avenue. I make a motion
[36:02]
that we approve resolution 2036-7.
[36:06]
» Been moved and seconded to approve
[36:08]
resolution. Excuse me. I didn't second.
[36:11]
I will second. It has been moved and
[36:13]
seconded uh to approve resolution 2026
[36:16]
destroy 7. All those in favor signify by
[36:19]
saying I.
[36:20]
» I. I.
[36:23]
» Guest recognition and participation. Do
[36:25]
we have any non-aggenda items that
[36:28]
anyone would like to speak to?
[36:31]
Speak now.
[36:33]
Uh please come up to the podium with
[36:35]
your name and your address
[36:39]
for the record.
[36:44]
Uh Patrick Goldlock, 2540 Honey Lane. I
[36:48]
have a quick question on the building
[36:50]
right here. The when when we when we be
[36:53]
getting closer to the financial end,
[36:57]
you know, knowing what the bid's going
[36:59]
to come in and for the the tax base and
[37:01]
the increase for the you know, the
[37:03]
residents.
[37:03]
» We'll make that presentation at next
[37:05]
month's meeting. Um based on the cost
[37:08]
estimates that we're showing tonight,
[37:09]
this $1.8 8 to $8 million.
[37:11]
» Uhhuh.
[37:12]
» And then, uh, the board will have to
[37:13]
decide if they want to bid it. Um, and
[37:16]
if so, how much reserves will be used
[37:19]
and how much will be a tax increase and
[37:20]
how much the tax increase will be spread
[37:22]
out over time. So, that's that'll be an
[37:24]
on ongoing discussion
[37:26]
» For next month.
[37:27]
» Well, I'll present all the information
[37:29]
next month and then
[37:30]
» Uh at some point we'll have to start to
[37:32]
make that decision. Yeah.
[37:33]
» Uh and then we've got to put the bid out
[37:35]
and the bids could always come in,
[37:38]
» I don't know, $12 million, in which case
[37:41]
then
[37:41]
» We'd have to go back to the drawing
[37:42]
board again.
[37:43]
» Yeah. Okay. And the other thing I uh
[37:46]
down on Rice Road, there used to be a
[37:48]
sign down there. It had uh children at
[37:50]
play. It was very
[37:53]
nostalgic, authentic at the time when
[37:55]
that neighborhood was built. Um where
[37:58]
did that go?
[37:59]
» No idea what you're talking about. We
[38:01]
can take a look at it and try to find
[38:02]
out.
[38:02]
» No, it's a street sign, but the street
[38:04]
sign went missing, but a new sign went
[38:06]
up. It just said watch children.
[38:08]
» Okay.
[38:08]
» And I just, you know, for being historic
[38:10]
Lancaster County, it was so strange to
[38:12]
see something that's been there since
[38:14]
Willis Rice was there probably before.
[38:19]
» Well, Pendot has a standards manual for
[38:21]
signs and they change it. When they
[38:22]
change it, we change our signs
[38:24]
accordingly.
[38:25]
» But we're not part of Pendot.
[38:27]
It's that's like a that's not a state,
[38:29]
right? That's
[38:30]
» Right. The pendot dictates the the terms
[38:33]
of what signages can be used in all
[38:35]
public roads.
[38:37]
» It's not a private road. It's
[38:38]
» No, it's a it's a public small secondary
[38:41]
really small road.
[38:42]
» Yeah. So, we go by the Pendot standards.
[38:44]
The Pendot issues a manual for all
[38:45]
signage.
[38:46]
» Okay.
[38:47]
» Based on reflectivity.
[38:49]
So, there's uniform signs around the
[38:51]
Commonwealth.
[38:51]
» Yeah.
[38:52]
» Yeah.
[38:52]
» Okay. I just wondered it just it's been
[38:54]
there for since the 50s or 60s. It's
[38:56]
like
[38:58]
looked nice. that caught your attention
[39:00]
more than the new one did, you know.
[39:03]
» Not accord not according to PENDO.
[39:05]
» Yeah. Well, yeah. Or for the state, but
[39:08]
all righty. I think that's about it.
[39:11]
» Thanks. Thank you. Anyone else?