Transcript
AI TRANSCRIPT
This transcript was generated automatically from audio using AI and hasn't been reviewed by a person — it can contain mistakes, including plausible-sounding sentences that were never actually said. Treat it as a starting point, not a verbatim record.
[0:07]
All right, calling to order the September 4th to 1st, 2022, meeting along the city council.
[0:14]
We need to remember everyone. It's 6.32 p.m. All council members are present this evening.
[0:19]
The exception of council number newcomer, who is absent with prior notice.
[0:25]
Item 2 is the pledge of allegiance. Please join me.
[0:31]
the flag of the United States of America.
[0:35]
In the U.S.
[0:36]
and the United States of America.
[0:39]
In the U.S.
[0:40]
and the United States of America.
[0:44]
In the U.S.
[0:44]
The U.S.
[0:46]
Okay, I'm three as mayor's comments,
[0:49]
along with the News,
[0:49]
the meeting review and updates.
[0:52]
For starters, we just finished a city council work session,
[0:55]
where we discuss the 2027 preliminary
[0:58]
lovey and budget as well as 2027 utility rates. No final decisions have been made on either
[1:07]
for those scheduled to continue, but we are having a discussion on the utility rates here shortly
[1:15]
during this evening's ranger meeting. And other comments are that we, we haven't met since
[1:23]
August 5th, we did cancel our meeting two weeks ago because wasn't anything pressing on the agenda.
[1:30]
So it's first time we met since August 5th, as a council, updates since then are, you know,
[1:36]
summers running down obviously, and school started today and that sort of thing.
[1:40]
So it's amazing how quickly summer went.
[1:44]
But since our last meeting is what I call it, corn days, which was on August 8th,
[1:48]
Thanks as always for a lovely area of chamber commerce for the organizing the parade and of course the church
[1:55]
St. George for corn days itself and most of the council was there for the parade and of course going to the
[2:03]
Event itself and have some great corn and seeing the exhibitors and live music and all that great activities at the church
[2:10]
But so thanks for that great event in our community and each and every summer
[2:17]
So that nothing major going on, so again, some other item too with other business as the
[2:23]
being goes on.
[2:25]
So move on from that item to an emporage as their privacy needs agenda, I'll entertain
[2:33]
a motion on the motion to approve the agenda.
[2:36]
12 seconds.
[2:37]
All right, motion and a second, any further discussion, all those in favor, second, five
[2:44]
saying aye. Aye. Opposed. Motion carries unanimously.
[2:50]
Item five, open correspondence. Open correspondence is item on the
[2:53]
generating, which the public may address the city council. From
[2:56]
election is taken by the city council and commented a little to do five
[3:00]
minutes or less. And open correspondence, comments may also be
[3:04]
emailed with cities sat by noon on the date of the meeting. And when we're
[3:14]
Thank you, honorable mayor.
[3:16]
Members of the Council, Paul Revere, Boston, Massachusetts.
[3:21]
I know that you 95% like you added.
[3:25]
I'm surprised it's down a bigger crowd for what's on the agenda tonight, because I am very happy with what you guys have come up with.
[3:33]
I just want to thank the city for seeking to pass a resolution in the upcoming consent agenda this evening to recognize September 17 to the 23rd,
[3:44]
This is a big deal, at least to me, and here's why I think so.
[3:50]
Given our current state of the union, I think we are in dire need to remind ourselves
[3:53]
about the U.S. Constitution, what it all means and what our rights and obligations are as the people.
[4:00]
The current federal administration has caused me to become a constitutionalist.
[4:05]
In the Battle of Lexington Concord, Massachusetts in April 1775,
[4:09]
there was what was known as the shot heard round the world and it's recognized as the
[4:14]
start of the American Revolutionary War. I don't think we have heard a shot heard
[4:18]
around the world since 1970 can't state when U.S. National Guard fired upon its own
[4:24]
U.S. citizens. Fast forward to January 7th and 24th of this year in Minneapolis,
[4:30]
when once again a tyrannis, a tyrannical, let's say, act was committed by the Federal
[4:37]
government, much like King George III and his loyalist in 1775, which in 1775 was an act that
[4:45]
became one of the many driving forces for the founding fathers to bring forth the declaration
[4:49]
of independence, where we advise King George that we, the people, will not stand for such
[4:56]
your tyrannous acts, and we're all created equal, and endowed by our creators certain
[5:02]
the alienable rights among those life liberty and the pursuit of happiness, which is a great book by Walter
[5:09]
Isaacson out for the 250th anniversary, great dye sex, that sentence, that was the greatest sentence I've lived in, it's a good short read.
[5:19]
So I think it's very important time in our country for folks like us to bring forth the U.S. Constitution,
[5:24]
green visit it, study it, exercise our rights as the people. In the past, when the human condition
[5:30]
was looking at a little rough my mother used to have jokingly say things will get better
[5:34]
come the revolution and things will get better we're just going to have to go through
[5:39]
some rough some tough times to get there and I think it's important to point out here a revolution
[5:44]
is not an act of violence by definition most revolutions in history have not been violent
[5:50]
and times that a revolution has become violent is most often been started by the oppressor
[5:56]
not those seeking change.
[5:59]
So, have hope in a peaceful resolution.
[6:03]
I hope everyone takes the time to revisit the constitution
[6:06]
and what it means to live in a democracy
[6:08]
during this week in September, 2026,
[6:12]
is the responsibility and obligation
[6:14]
of everyone participating in order for it to work correctly.
[6:19]
And I hope everyone gets out, exercise their rights,
[6:22]
makes their voices heard, speaks out against the pressures,
[6:24]
And most of all uphold the laws and the principles of the U.S. Constitution, that's what being a constitution of cities.
[6:33]
So I really want to thank the City of Long Lake, the daughters of American Revolution, who got this
[6:52]
emails, it's upcoming U.S. Constitution Week in September and do something with it.
[7:02]
All the proclamation down in the park, you can get logos from the daughters of the Revolution website to use example here with.
[7:15]
There you go. So I think it's a great thing you guys are doing. Thank you for doing that.
[7:19]
All right, thank you Mr. Rebeer. I mean Mr. Miller.
[7:23]
Oh, sure thing.
[7:27]
All right, any submitted open correspondent?
[7:31]
All right, thank you. So then moving on to item 6, which is the consent agenda items A through G and the consent agenda this evening.
[7:40]
a couple to call out our item affis issuance of special permit for the gear was wet gear
[7:48]
western country half marathon of 5k event on October 10th screen a minute there and
[7:56]
yes item g and up to resolution number 20 of 2026-37 recognizing September 17th through 23rd
[8:04]
as Constitution Week in the city of Long Lake, and as noted in the item, the packet item.
[8:14]
There is that was request from daughters of the American Resolution, specifically the Lake
[8:22]
Minotaka chapter, and Marine Steel Bellows, regarding it being Constitution Week, as designated
[8:31]
in 1955 by United States Congress. So it occurs every year. I guess if it should start in
[8:40]
in 1956, my president Dwight D. Eisenhower. It's not sure if we recognize this before in previous
[8:47]
years, I guess I don't recall it during my term here per se, but just recognizes the constitution
[8:54]
which was frame of course in 1787 and has stood the test a time amazingly and all of all of these
[9:04]
years and hopefully will continue to in the many years to come in history or nation.
[9:11]
So I wanted to point that out and then also improving the LMCC, I should mention LMCC,
[9:18]
2027, a budget, I don't know if you want to mention anything about that.
[9:21]
It's just trying to keep expenses low according to the plan and the executive committee.
[9:33]
No, actually it was the full meeting approved the budget.
[9:40]
Was it a couple weeks ago?
[9:47]
Yeah, two weeks ago.
[9:49]
I was here.
[9:55]
But yeah, I know they've mapped out what the projection is for the revenue because the revenue keeps a declining each year, and hopefully when mid-coke comes online, maybe they'll kind of supplement some of the revenue and increase the revenue, but they have a mapped out for, I forget the end date, but yes, in trying to keep expenses low and trying to look for it.
[10:20]
or a more opportunities to get income.
[10:23]
Good.
[10:25]
Okay.
[10:27]
All right, well, let's do any questions for staff
[10:29]
and entertain a motion to approve the seedings consent agenda.
[10:33]
I can motion to approve the consent agenda.
[10:36]
Thank you.
[10:37]
I'll second.
[10:38]
Thank you.
[10:39]
Motion in a second.
[10:40]
Any further discussion?
[10:42]
I'll as in favor of signify by saying aye.
[10:44]
All right.
[10:45]
Post.
[10:46]
Motion carries unanimously.
[10:48]
All right.
[10:50]
Thank you. Okay, and then moving on to item seven, regular business starting with seven A, authorized negotiation of a temporary access agreement allowing you support and part property by Excel energy for a transmission line improvement project.
[11:06]
Yes, I am tonight. I'm going to be introducing Mr. Brian Melky of WSB. He is going to be working with Excel energy on a project that they are working on.
[11:16]
To rebuild the existing transmission line that is located between the city of Mount and Gleason Lake.
[11:24]
However, in order to access these transmission utility lines located near loose line.
[11:31]
Located near the loose line trail, Excel Energy is requesting that they be allowed to utilize Harden Park for an approximate period of six months.
[11:40]
Tonight, we are going to hear from Brian a little bit as he provides us with some information on the project.
[11:47]
And we're also asking council to authorize myself, the city administrator to negotiate with him and executing a temporary agreement and some compensation terms.
[11:58]
So I invite Brian up to the podium to talk to you.
[12:01]
All right. Well, come Brian.
[12:03]
Thank you.
[12:05]
Stop it up there.
[12:08]
Thank you, Mayor and council.
[12:10]
Administrator Nguitzky.
[12:13]
Did you get it?
[12:14]
It's over late.
[12:15]
It's over late.
[12:16]
It's over late.
[12:19]
I think the city administrator of Nguitzky got
[12:23]
got things summarized fairly well.
[12:25]
Accelerators got a transmission well.
[12:27]
They've got numerous transmission lines.
[12:29]
And if you drive around this north.
[12:31]
But what I'll call a north and western metro area, you'll see a lot of rebuilt work in the last few years for these 69 kilobolt lines.
[12:39]
They're simply at end of life. That's what's happening and how our late Montrose, those segments are done.
[12:45]
I've got one starting between Mound and St. Bonnie in about a month, not even.
[12:52]
They're all reaching end of life. And this is one that was built in 1960.
[12:55]
and follows the loose line trail between basically loose and make elementary to a
[13:01]
substation basically downtown mound. The challenge we have with this segment along
[13:09]
the loose line is there's a few spots not just the one by heart and part but a
[13:13]
few others or the topography and or the bridges are such that you can't get
[13:22]
back. We looked at what are some access points where we don't have to do a ton of tree removal,
[13:30]
a ton of grading, etc. Things like that, and hardened park is effectively hits that.
[13:37]
Can I ask you a question with your map? It looks different. It doesn't look like it's going through
[13:43]
Pardon park is this it goes right along it so the south east side I would yeah south
[13:52]
east or straight southern way the south end of hardened park which is quite frankly
[13:58]
the south end of long lake as I repeat there's a three structure span so roughly
[14:05]
a thousand feet between for giving me I don't know the road names we able to project
[14:11]
the map a pair of a chance or not so admittedly the maps didn't copy well right it's
[14:24]
to create a color one in our pack of some might show up better on that projector
[14:30]
hit
[14:33]
i miss read it so i think it is kind of close to it so that's what your
[14:38]
is it gonna be buried
[14:39]
The transmission line will not be. Transmission lines as a whole generally are not.
[14:45]
Really?
[14:47]
Yes.
[14:47]
Because they're large.
[14:49]
Large. Okay.
[14:50]
The distribution lines, there's actually...
[14:53]
Distribution would be the lines that all for lack of better words.
[15:00]
I'll compare to your city streets or your township roads that serve the neighborhood and come to your driveway.
[15:08]
That's basically a distribution line. Transmission lines are more your county state and interstates.
[15:15]
They go substation to substation.
[15:18]
So, and those are very, very infrequently undergrounded.
[15:24]
Is there a transmission line there now?
[15:25]
Yes. So, it's just replacing the one that's there.
[15:28]
It's replacing the one that's there, and the post challenge. Go ahead, I'm sorry.
[15:33]
Oh, sorry. That was me that I was asking the polls too. It lines and the polls that are there,
[15:38]
a long time. Correct. And effectively, what's happening with that line built in 1960, you may have
[15:45]
seen granted were right at the border and the line follows the loose line. You may have noticed
[15:53]
some holes being replaced over the last five to ten years and they've done single
[15:58]
pull replacements. We've had places where we basically put bracing on them to get
[16:04]
them through. But the analogy that I've used is it's kind of like a car. You need
[16:08]
new tires great. You need new spark plug great. All of a sudden you're transmitting your
[16:12]
engine or going bad. You replace the car. And that's where these lines are at.
[16:18]
So you're placing more than the poles. You're replacing the whole thing.
[16:21]
it'll be the whole thing yeah but it's not going to be any bigger than it is now or is there
[16:27]
are they going to be more polls is it going to be taller you know it's going to be the polls themselves
[16:33]
will anticipate being 10 to 15 feet on average taller the reason for that it will be upgraded to
[16:41]
current standards so we'll have what's called OPGW which is basically a fiber communications line
[16:47]
that is just for the transmission line that'll be added.
[16:51]
The pole counts should be similar,
[16:53]
the operating voltage is staying the same.
[16:55]
So there's no operational change in it.
[16:59]
It is swapping what's there for a new line.
[17:03]
I have actually seen this project going through Montrose
[17:06]
and Township areas.
[17:09]
So I've seen those pole changes.
[17:12]
I was going to say those new poles are bigger.
[17:14]
You're taller.
[17:16]
Yeah.
[17:16]
And I'd like to kind of lose line a lot in East of Cleasonic Lake Elementary.
[17:21]
There's things we knew, poles and on that stretch.
[17:25]
So maybe sort of that are taller and metal, I think.
[17:29]
I kind of think.
[17:31]
I would have to.
[17:33]
I'd have to look.
[17:34]
I wasn't involved in that segment.
[17:37]
But yes, that segment was rebuilt.
[17:39]
I want to say about five years ago.
[17:42]
So, um, are there more lines on it than on the current one?
[17:49]
No.
[17:50]
Operationally, it'll stay the same.
[17:52]
The one thing that I will 100% acknowledge is there is places where the service lines cross.
[18:00]
The transmission line.
[18:03]
And they're on the same pole.
[18:05]
There's places the geometry will not work to move the service lines.
[18:09]
So, you may see an existing poll that stays and it's cut off with a new poll, number of feet away.
[18:23]
That's going to be very, very limited.
[18:25]
It's going to be limited to where it's necessary for the geometry of the service lines,
[18:29]
but that'll be the one place that I'm aware of that we'll be seeing,
[18:34]
and pull count 10 degrees.
[18:38]
Do these make noise?
[18:39]
Is there a humming noise to these transmission lights?
[18:44]
I'm going to answer that both correctly, politically, and also, I'll call it directly.
[18:52]
When there is not something wrong with the line on a 69 KB line, you should not be hearing them.
[18:59]
Does it happen?
[19:00]
Yes, if clamps get loose or something in that nature, there are times when I've heard a 69 line, but it means there's something not right.
[19:08]
And then you come out and fix it?
[19:13]
To some degree, it depends a little bit on what it is, and it has to be something that makes the utility aware of it or someone else.
[19:23]
You know, makes them aware of it. I can remember a time and Plato transmission line got hit by a car and was hanging by a toothpick.
[19:31]
But the pole didn't break, while the utility didn't know about it until quite frankly my dad called him because it was in front of the church that he
[19:39]
was in the lawn for at the time, mow the lawn for.
[19:43]
So the person that hit it, never called.
[19:47]
No.
[19:48]
And the police report hadn't called them yet either, which was the part that was really bizarre.
[19:52]
Because that's normal part of reporting.
[19:55]
But dad called the utility because he called me and said who do I call?
[19:58]
I said you just did.
[19:59]
I'm seeing on the proposal for use of Harden Park with that essentially just be like for traffic to drive through.
[20:07]
Are you talking about storage?
[20:10]
What type of equipment would be on that road?
[20:12]
I am realizing in the back of my mind that while initially I'm not sure this was fully present but having just been talking about future bonding for a street project.
[20:23]
Greenhill and Glenmore Lane are in rough shape to begin with so if you're
[20:27]
hauling heavy equipment over that all of a sudden that's a bigger deal I think
[20:32]
then I was initially thinking
[20:36]
I don't know if public public works director
[20:39]
right I don't know the public works director added comment but jump in if you'd like
[20:46]
but we had that same discussion in the field when we were talking about this is not
[20:57]
what would the use of the streets and the park property be?
[21:02]
It would be for specifically the three pole segment between
[21:05]
why is that a boulevard highway 12 to get the poles and the
[21:09]
equipment necessary in there.
[21:13]
In terms of what would I see for equipment,
[21:17]
you're going to see a drill rig.
[21:21]
Let's see, I do not know if any of those three,
[21:24]
they're all what we call tangent structures, which is straight. I don't know if any of them
[21:29]
would have a foundation or not. I could find that out, but I don't know right now.
[21:34]
I'm just trying to get a sense of, you know, are we going to see a lot of vehicles on that
[21:41]
roadway?
[21:41]
To give a sense, it would be the same equipment for other rebuilds that we've done, but it would
[21:49]
limited to just those three polls. And we've driven these down four time paid
[21:53]
roads with no issues as long as we don't do it during the road restriction
[21:57]
season. That said, it could be wrapped into an agreement for use through
[22:05]
hard and park. You know, I, how did I, I wrote a note to myself after you
[22:10]
have been able to yesterday. I remember you, what was the, a condition
[22:15]
I would prefer that being done in the winter myself.
[22:20]
And this stretch along the loose line is intended to be the winter for multiple reasons.
[22:25]
One is the trail itself.
[22:27]
Now I realize there's no one to be a traffic on it.
[22:30]
There's not some of those allowed west of Stubbs Bay Road in Orno.
[22:37]
Yeah, I just was, was still Orno, because they've got the signage up for snowing wheels.
[22:44]
That's right. I apologize. I just looked at a spot in Orno before I came here.
[22:51]
But for traffic purposes and quite frankly, with us being through several Gulf courses,
[22:57]
We're actually also planning to do the segment that goes into mound, frankly, in the winter, as well,
[23:03]
at least a portion of it, because it sounds silly, and I don't mean it to be a joke.
[23:09]
It sounds like it.
[23:10]
But our crews don't want to be dodging golf balls anymore than the golfers going to see them there, frankly.
[23:16]
I think what I'm trying to get down to is an estimate of the average daily traffic impact on that road,
[23:22]
as well as is there going to be equipment actually parked in the park and will there be
[23:28]
like poles laying in the park. What's the actual impact to Hargan Park and the daily impact to
[23:36]
the residents who live on that street? The daily impacts are going to vary a ton because what
[23:43]
you're going to see on transmission line rebuild is you'll see effectively we need to get in
[23:49]
you can do some low-cates and you won't see anything for months. Then drill poles, in this case,
[23:56]
three of them, and in those days, I can't, I'm sorry, click Miller, Miller, I can't give you an estimate
[24:08]
off the top of my head, but you're not, this isn't going to be 100 vehicles a day, you're talking more
[24:18]
in the even on the heavy days, you're talking more in that much lower range. Without getting
[24:25]
an estimate from the crew, I don't want to put a number to it. Then you'll see a period
[24:31]
where there's no activity, again, until they set the poles and are stringent and wire.
[24:38]
So would poles or equipment be proposed to be stored out there?
[24:42]
Oh, yes, that was the other question I was trying to remember. No. We would not plan to be
[24:46]
using the park property for any sort of staging and storage
[24:50]
or other than the matting that we would put down.
[24:54]
Even in winter, we would plan to put matting
[24:56]
to protect the turf, and it's the interlocking polymer mat.
[25:02]
So that particular route, I have a lot of me in under.
[25:08]
If that were to break, how easy is that matting to come up?
[25:12]
And it's probably good.
[25:14]
It's the emitting itself is pretty easy to get out, it's easy to get in and out, it just takes time because it's heavy and it takes equipment.
[25:24]
But yeah, that's the best answer I can give you, Sean, I'm sorry.
[25:29]
It's a fairly easy, fairly fast, it's just heavy and it takes equipment.
[25:34]
Another question I get is on street parking.
[25:39]
That was just my question to hear.
[25:40]
are we going to be parking all our rigs on the street or in the loose line or what's the
[25:46]
plan there? This is the street right now of the park. There is no street parking in this area.
[25:55]
There's a cold attack at the end, but that's it. I don't want any stress. That's a lot of driveways.
[26:00]
You can't fit more in the hand full of vehicles there. And I wouldn't anticipate any street parking
[26:07]
or park parking, other than what I could foresee is a crew stopping having a crew pick
[26:16]
up or something like that, park on Glenmore, near a world we park when we met.
[26:21]
I just don't want to come in at four o'clock in the morning and have to apply that road
[26:25]
and have 15 ex-altrucks sitting there, down point, or whoever, well, and again, that'd be one
[26:33]
things I was looking for my notes and I had written it yesterday,
[26:41]
having a
[26:41]
condition within there of no staging and no overnight parking of any means.
[26:48]
You don't actually allow that in citywide. Yeah. That wouldn't be unusual.
[26:54]
So, project-wide, you will end up seeing some street parking where we have places
[26:59]
where we cross-roads, for example, it wouldn't, for example, I wouldn't anticipate it, well,
[27:07]
then there's going to have to be some sort of roadway protection and a lot of times we do that.
[27:13]
It's a horribly discript, horrible description, but I would expect we would have either a
[27:19]
tent pole or a truck with what we call bat wings, protecting highway 12, for example.
[27:25]
they do that when they string the wire so it's pretty uncommon but if you have a
[27:31]
catastrophic failure you know we don't close the roads to string a wire. So you
[27:36]
can have excavators and track equipment in there, how big of equipment is going
[27:41]
in there. In this location, will it be in tangent? I'm sorry. Multitone excavators or
[27:54]
winter I would expect we would have a drill rig we would have bucket trucks and we would
[27:59]
need a we would need a likely rubber tire I would the biggest thing I would expect to see
[28:07]
would be the rubber tire crane to set the poles so how long is the bumper to bumper on
[28:15]
these pole trucks are gonna be able to even wiggle in there yes yeah when we looked at that
[28:22]
Crayer's was the individual from the construction end that joined us.
[28:27]
When Jake was looking at that, we did have, well, in either direction, if we went around
[28:34]
the grill, or if we went closer and by where the tennis courts are and follow the trail
[28:41]
in either case to be fair, there's a couple of trees that would likely need to come down
[28:46]
to make the turning movements, and that was actually in the notes that I'd sent.
[28:51]
I don't know if you guys have those or not.
[28:54]
You plan, I'm sorry.
[28:55]
You plan, I'm sorry.
[28:56]
You plan, I'm sorry.
[28:58]
Are you able to show where the poles are located?
[29:03]
If you zoom, just a little bit to the south.
[29:09]
The poles are located, go to, there you go.
[29:13]
There's the first one right there.
[29:15]
And then they go, and while they go east and west, there's two.
[29:20]
Oh, I sure.
[29:23]
Okay, so it's those three that we're talking about.
[29:26]
Yes, sir.
[29:27]
So you're going to be more on the close to the loose line with some of the heavy equipment.
[29:32]
You are going to be there.
[29:33]
But the hardened park is just the staging.
[29:35]
So you're going to be there.
[29:36]
Access and access.
[29:37]
Access only.
[29:37]
It wouldn't even be staging.
[29:39]
Hong, oh sorry.
[29:40]
clarify that.
[29:41]
So do you need concrete?
[29:42]
How do you set them?
[29:43]
Concrete?
[29:46]
If that's one thing that I have to check.
[29:48]
council member sorry I want to say commissioner I'm planning commission that's one of the things I need to check any of these three polls would have a foundation or not
[30:00]
On tangent polls, meaning in line polls, they're straight in line with the ones on next to them.
[30:07]
The majority of the time, we do those what we call direct embed, which is direct right into the ground.
[30:15]
What has happened? I've seen over the last, I'm going to say five years is almost every project they're actually using culverts as well.
[30:24]
because it's when you drill the hole the dirt's fallen in. So instead what they've
[30:30]
gotten into the habit of doing is using embedded culverts that both holes the
[30:35]
whole form and then they can backfill that with rock. So you don't see the culverts
[30:40]
they're all subsurface but they're there. I'll describe a culvert. I think a
[30:48]
culvert thing something goes underneath the road your time is like a
[30:51]
pre-manufactured metal. I'm inside concrete. It's a two. Just a two. Okay.
[31:03]
That's what I
[31:03]
would anticipate on these three poles although it'd be fair. I'd have to double
[31:07]
check with engineering if any of these three are planned to have a foundation.
[31:13]
And then the trees I think are rather than the tree that you would you in the
[31:20]
so it's kind of for us if you had to come down.
[31:23]
We could replace them or we can compensate for them.
[31:26]
Either of those could be the case.
[31:28]
I will tell you the size that they are.
[31:32]
It would be harder to replace a kind of fur of that size.
[31:36]
It is not however impossible unless they've grown quite a bit since March.
[31:42]
Quite frankly I know that because I just had one done myself
[31:45]
by one of the tree companies that's just north of Buffalo and whose name is escaping my mind now.
[31:53]
But I would recommend to anybody.
[31:57]
I have a question for you, because I didn't understand this.
[32:01]
An alternate path would go towards the trail area basically along the southern end of the ice
[32:08]
ring.
[32:09]
Fill area.
[32:09]
I was just wondering what that was.
[32:10]
for the current walking trail is
[32:14]
Eggs and things are nice right there
[32:16]
We used to have a flood that between the tennis courts and the playground equipment
[32:20]
No one used that either
[32:24]
Okay, first couple years I was here
[32:27]
Okay, so I edited my notes slightly so they'd read better for this purpose, but I'm more or less
[32:33]
Copping paste into notes after we met in the field
[32:36]
So, prefer the first route other than staying off of our walking trail because you're going
[32:41]
to have to replace that too because it's going to give you a bit of, there's probably
[32:45]
three inches of the two minutes there.
[32:57]
So, I do have one further question Brian, 20 years down the road, we're going to need this access
[33:02]
point for maintenance for vegetation control.
[33:07]
Typically, no, and here's why.
[33:12]
Vegetation control can get in with a lot of smaller stuff, frankly, and if it's done
[33:17]
right, they might not be the correct word to use.
[33:23]
But done with the preferred methods, they can do it in a way that you really don't see
[33:29]
the large growth come back in the corridor.
[33:32]
To be fair, this is one of the worst corridors I've seen.
[33:36]
I can believe that.
[33:39]
Especially in the summer, there is so much vegetation underneath that line, they have trimmed
[33:46]
it enough to keep the minimum clearances, and I will also tell you the easement that
[33:52]
was very, very specific.
[33:54]
It's one of the best easements I've ever seen, but it also allows for up to 15 foot trees
[34:00]
to be planted right within the right away.
[34:04]
which is pretty unusual. This we are to be fair we are going to have to clear the
[34:10]
right of way enough to get equipment everywhere. Replace those poles and pull the
[34:14]
existing. There will be some places that we slightly modify the center line as well
[34:20]
to stay within the easement itself and not be impacting private properties.
[34:24]
So is that coming out of there or is that staying in there?
[34:27]
It's gonna stay on the loose line property.
[34:29]
So you can cut down the stand.
[34:32]
Oh, and help me understand.
[34:34]
I'm sorry.
[34:35]
The vegetation that you're going to clear out is
[34:37]
it's staying in the right way or is it coming out
[34:39]
me and all that?
[34:40]
Oh, we anticipate that.
[34:43]
We anticipate that the DNR will have us
[34:46]
haul it all off.
[34:47]
So it's going to have to go through hard and part.
[34:51]
There, I wouldn't anticipate no.
[34:54]
And I could talk with veg and make sure.
[34:58]
Let's make sure that we need to know that.
[35:02]
I would like to thank the bridges.
[35:06]
I think the bridges are both heavy enough and large enough.
[35:09]
Then we can get the badge out.
[35:11]
Like from the cul-de-sac.
[35:12]
Right on the trail.
[35:13]
That's it.
[35:14]
Let's verify that please.
[35:15]
I think that was going to the park.
[35:17]
Is it another?
[35:18]
Yeah, I know.
[35:18]
I'm just going to park.
[35:20]
That wasn't even thinking of that frame.
[35:21]
I didn't think that frame was.
[35:23]
Because we wouldn't.
[35:24]
That's going to be a whole separate time frame.
[35:26]
Thank you so much.
[35:27]
vegetation for four and be down there maybe by the golf course.
[35:32]
All right.
[35:38]
So can you just clarify, I haven't confused maybe just so you're
[35:43]
staging it and not staging it.
[35:46]
You're putting down matting and you'll be putting some stuff there.
[35:51]
But you're going through a hard impact through the trail in one way or you're going
[35:56]
off the street in the other way.
[35:59]
So, I could not get up and show you a deed.
[36:01]
Oh yeah.
[36:02]
Well, I was gonna offer the same.
[36:08]
Talk loud, so the mic's gonna hear you please, Sean.
[36:31]
I used to the park shelter in Wiggling, now.
[36:35]
Oh, okay.
[36:36]
This kind of event doesn't work.
[36:40]
I'm going to the Slarky Trail Access,
[36:42]
which is playing about to put the deer in the specific stuff there.
[36:47]
Maybe six out of the feet with right there.
[36:50]
And I really do that.
[36:51]
Okay.
[36:52]
Really do not want to go down that far from here.
[36:56]
Okay.
[36:56]
So we go this way.
[36:59]
You make it work.
[37:00]
That's not going to end.
[37:03]
All right, thanks for that.
[37:09]
All right.
[37:11]
Way to the questions for Brian.
[37:14]
It's kind of making sense to folks and you get this wouldn't occur until the fall
[37:20]
winter of 2028 slash 2029.
[37:24]
That is our plan.
[37:25]
And the reason, Mayor, why I'm here early, is...
[37:31]
Our alternatives, there's alternatives that exist, but they're limited and they would mean doing some other, I'll call it significant grading and clearing planning. So it's long lead time type activities.
[37:45]
So, if we have what I'll call a general understanding that we can work toward having an
[37:52]
agreement in place with staff or with council,
[37:58]
then I have that certainty.
[38:00]
Without that, I've got to start working on those other alternatives very, very early.
[38:05]
And the other thing I will state intentionally is we've been coordinating with the local
[38:11]
government along the trail as well as the DNR. This is by far the most public
[38:17]
announcement that's been made is simply being here at the meeting. We haven't
[38:21]
announced the entire rebuild yet. That's teed up, but we've been trying to get
[38:26]
some back and forth. I'll call it items clarified with the DNR. Minor things such
[38:33]
as oh, this poll needs to be ex-feet from the trail. Okay, trying to make those
[38:38]
or shifts. So if this didn't work, how would you go through the loose line trail, would you go on?
[38:44]
That's what it was at. We'd have to do potentially we'd be looking at bridge modifications.
[38:51]
Potentially we'd be looking at taking coming off a highway 12 and doing a significant amount of grading.
[38:58]
Or why is that a boulevard? It would be something frankly we'd look at with the construction team because, you know, we're not
[39:07]
But for lack of better words, we're not going to try to force anything through anywhere.
[39:13]
We know that we're going to have some upset people when we've got to start clearing trees
[39:17]
and we know the DNRs purpose and the transmission line purpose are sometimes at odds.
[39:24]
But at the same time, we're looking for what's the least impact alternatives.
[39:29]
Because it looks like there's not much space between that playground set and all that.
[39:34]
that seems like that would be a huge thing to have to,
[39:37]
if you.
[39:37]
I would try everything in the world to avoid that.
[39:40]
I don't know.
[39:41]
A few notes that I wanted to mention,
[39:44]
I've been working with Brian,
[39:46]
and if this is something Council is comfortable with,
[39:49]
what the recommendation is tonight
[39:52]
is to authorize, it says myself,
[39:54]
but myself and staff to continue working with Brian
[39:58]
and negotiating and making sure
[40:00]
that we are being compensated,
[40:03]
but also taking the best route to do so.
[40:08]
He'd be working on the Sean.
[40:09]
He'd be working on the genetic and right away permits.
[40:13]
And I also made a note, you know, probably we'd feel
[40:15]
at some type of an espros, so that we would have our engineer
[40:18]
to take a look at it to make sure that our infrastructure
[40:23]
is significant for what they're looking for.
[40:26]
And if things were damaged, if they're damaged.
[40:28]
And so yes, Brian and Brian myself and Janette have already
[40:31]
had emails and shone as well, so there are areas that we're thinking of, we bring three different
[40:37]
areas of expertise to this, and so if the council is comfortable tonight you're not necessarily
[40:43]
approving a specific route or anything, you're approving us to move forward in the discussion.
[40:52]
It's an option. To negotiate an agreement and see if you can arrive at terms that can
[40:58]
And we've been making notes all the way throughout.
[41:04]
A million little comments here.
[41:06]
This isn't things involved in that, too.
[41:08]
He wouldn't be, could be yes.
[41:10]
Can I ask another, what, like, dumb question?
[41:12]
So you only replacing three poles,
[41:14]
but it seems like you're in there.
[41:16]
Why wouldn't you replace some more?
[41:18]
Because...
[41:18]
We will.
[41:19]
It would just be for those three poles that we don't have an alternative.
[41:22]
A better alternative to get that.
[41:25]
Because the bridges on,
[41:27]
that a boulevard in Highway 12 are such that as they're sitting, we can't get the equipment through.
[41:37]
So there's only three poles between the bridges and the exacto.
[41:41]
That's exactly said. If you can see them on Google Maps,
[41:44]
the whole line is being replaced, but this agreement would just be for those three poles because
[41:49]
That's all we'd be accessing in that spot, where the unfolds are, it's horrible.
[41:57]
How do they get them in before?
[41:58]
That's a good question.
[42:00]
Depends on whom you asked us in Britain.
[42:03]
There was in two bridges there before.
[42:05]
There wasn't a bypass at all, 25 years ago.
[42:09]
That's 26.
[42:10]
There's a lot of different terrain.
[42:13]
All right.
[42:14]
Well, I'll make a motion to authorize the city minister in negotiating
[42:17]
next QA Temporary Access Agreement and Compensation Term,
[42:21]
subject to the City Attorney's Review and Approval,
[42:25]
for the purpose of allowing Excel energy to utilize hard and
[42:27]
park to access utility transmission lines,
[42:30]
located on or near the loose land stage trail.
[42:34]
I'll second that motion. Thank you. Motion in the second,
[42:38]
any further discussion? All those in favor?
[42:42]
Hi. Hi. Hi.
[42:45]
I suppose motion carries him.
[42:49]
Thank you.
[42:50]
All right.
[42:51]
I guess there's probably still a railroad running there.
[42:55]
Yeah.
[42:55]
Oh.
[42:56]
I can just put it in my rail.
[42:59]
Oh.
[42:59]
I think it's something like 72, 73, something like that.
[43:03]
I'm a street train.
[43:04]
You know me.
[43:05]
Yeah.
[43:05]
You gotta say we don't want any.
[43:07]
You go a little further west than when I was a kid.
[43:10]
there is still a train that ran but wants a week so yeah now there's
[43:15]
now the tracks have been gone and doesn't have a bus in New Zealand that's where
[43:21]
it is all right so with that move on to 7b adoption 2027 city utilities and recycling
[43:31]
rates yes thank you so tonight in front of council I have the resolution for the
[43:37]
Resolution 2026-40 to adopt our 2027 utility rates.
[43:46]
This will include water sewer, storm water recycling, organics, and any past-through fees that we have.
[43:56]
In front of you, I have my proposed changes for the 2027 rates.
[44:01]
There is nothing significant, they with the exception of storm water.
[44:07]
I am recommending a rather large change for the storm water fee base fee to go for $4.95 of to $8.58.
[44:18]
This would allow us to start preparing to work with the Metropolitan Council on future storm water improvements in our city.
[44:25]
I'm also happy to announce that we've received notice that our Metropolitan Council,
[44:29]
sewer treatment fee has gone down for 2027 and if you'll recall that was a pass through to our residents
[44:36]
So that fee will be going down for each of our residents.
[44:42]
Is that because we've had a
[44:44]
dry year? I believe it was because we've had a dry year and we did
[44:49]
minor
[44:51]
lining a few years ago, but I'm
[44:54]
I'm thinking mother nature was just on our side so that went down at out a dollar 75
[45:02]
I'd also like to point out to council that
[45:13]
our rates continue to be lower than many of our neighboring communities.
[45:19]
If you'll see here, we are calling in the bottom half, almost the bottom third of our rates compared to communities around us.
[45:31]
And this is our 2027 rate compared to 2026 rates of surrounding communities so that could
[45:38]
that could continue to change as rates get adopted.
[45:42]
So if Council does not have any significant questions for me.
[45:47]
I think we've talked about this in the...
[45:50]
We have talked about this.
[45:52]
On average, our resident will see an increase of around 3% under utility bill,
[45:58]
which is around $3 or less.
[46:01]
And so I feel that our residents, that's fair and equitable to our residents right now.
[46:10]
So the largest increase for residential in this scenario would be someone that uses 8,000 gallons.
[46:16]
They're monthly bill would increase around $4.80, which is a 3.1% increase.
[46:22]
Commercial, we are going to be consistent around a 3.3% increase.
[46:29]
Yeah, appreciate all the work you've done last couple of years.
[46:33]
Kind of helping to get our utility rates and in check and count a good place where it seems
[46:38]
to be fair and equitable based on usage and household size and all those kinds of things.
[46:46]
So I think we're going to do a good place with these rates here compared to when it's
[46:52]
first on the council.
[46:54]
It's well thought out, and I think I'm nice that we used it, the Met Council is attached to the fee so we're actually covering that cost.
[47:01]
I agree, and it's also nice as a city to, for our residents, to see that we're not keeping the money.
[47:08]
I'm actually talking tons of fees over $400,000 a year right now, and so for our residents to understand that that money does not stay within the city.
[47:17]
It makes it clear for them to know where the money is going.
[47:20]
So, I would echo what Charlie said.
[47:26]
Good job.
[47:27]
Yeah.
[47:28]
Thanks for all the work.
[47:32]
All right.
[47:33]
Well, I'm going to consider the questions in here.
[47:37]
I'm going to entertain a motion on this one.
[47:40]
I can do
[47:45]
that.
[47:45]
I'm going to go right here.
[47:46]
So I'll make a motion to adopt resolution number 2026-40 establishing waters.
[47:52]
sewer, and storm, sewer utility rates, and establishing curbside residential recycling,
[47:59]
and residential organics recycling rates.
[48:03]
Second, thank you, motion in the second.
[48:07]
Any further discussion?
[48:10]
All those in favor?
[48:11]
Aye.
[48:12]
Post.
[48:13]
Motion carries unanimously.
[48:16]
Great.
[48:16]
Thank you.
[48:19]
Okay.
[48:19]
with that move on to eight other business.
[48:22]
Start with Kyle's number of Feldman.
[48:27]
All right, Kyle's number of DMK.
[48:29]
I don't have anything.
[48:32]
Oh, OK.
[48:33]
Oh, I said.
[48:37]
That's never happened before, I'm sorry.
[48:43]
So the Orno High School football team
[48:47]
has their first game this Thursday.
[48:50]
So good luck to them.
[48:51]
There are playing Becker, we're all heading up to Becker and be a good game. My son happens to be playing on it, but
[49:01]
Yeah, so excited for that. Yeah. What role does he play? He's quarterback. Yeah. Good luck to see you. Yeah, thanks.
[49:14]
All right. All right.
[49:16]
That's a good, good to glad you remembered that.
[49:21]
All right, one thing I'll point out is that a couple of weeks ago in August 13th
[49:26]
to City of Administrator and City Clerk and I all attended the Oral Regional Commercial
[49:30]
Tobacco Prevention Meeting, which was a kind of a consortium that was spearheaded by
[49:36]
Hannah McCowny and Public Health officials, where they are working with communities in the
[49:45]
similar ordinances on the books for tobacco sales, try to keep things consistent amongst
[49:54]
the cities in the school of the district, and the city of Oregon kind of got to
[49:58]
headstart in this compared to some other cities, and the last year I will last year I believe
[50:03]
change some ordinances at the recommendation of the county regarding tobacco sales, and in
[50:09]
our staff are working on some looking at those changes to try to bring those to the council
[50:15]
here, hopefully, in the coming months, to make some changes to be in line with the other
[50:21]
cities.
[50:22]
So there's representatives from our state, our own there, our own place, why is that a
[50:26]
police?
[50:27]
What has happened?
[50:28]
Public safety, city independence, they weren't in participation or weren't available, but
[50:35]
maple plain was.
[50:37]
So, just to give you guys kind of a snapshot of that or a sneak peek that we've got, it was
[50:44]
to do in our ordinances and the, and Genekus Peak Board.
[50:48]
So this, that was a little bit surprising.
[50:50]
I mean, you know, just being behind the curve and that, but we, you know,
[50:54]
not necessarily something we've been focusing on, but I think the time was come to kind of focus on that.
[50:59]
And just to ensure that we're, we're keeping up with the Jones is when it comes to our ordinances on tobacco sales.
[51:07]
So, what I mentioned that, to the council,
[51:10]
I'll put the signs that.
[51:15]
North West Hadapom League of Municipalities kind of takes a summer break so we've got
[51:19]
a couple months off and that's going to start up here in the next week so keep you up
[51:22]
to speed on that and so it's meeting to start up again.
[51:27]
So that is it for me?
[51:28]
Nothing for me.
[51:30]
Nothing for me?
[51:31]
Well, alright, Janette.
[51:34]
Talk to you a lot.
[51:38]
Our city hall door replacement project is scheduled in just a couple weeks.
[51:43]
So mid September, I think they said it was the week of the 14th or something.
[51:49]
But anyway, just a couple short weeks.
[51:51]
So we are on the schedule to see that happen and get done.
[51:54]
That's great.
[51:55]
Took a while for supplies to get on order.
[51:58]
Striping of the city hall parking lot.
[52:01]
So he's been working on coordinating that, too, and I'm not sure when that's done the street work or that striping is going to be getting better.
[52:11]
Yeah, I think pretty good.
[52:15]
All this crosswalks over here, crosswalks over here.
[52:20]
Yeah, I have been in a lot of training and we'll continue to be in training for a little bit here on our...
[52:30]
I'm necessary upgrades to our meetings module for our software, for meetings management, along with a necessary website of dates. So lots of training going on there.
[52:46]
I thought you thought that was going to be off you to do list.
[52:50]
I like for both things.
[52:52]
I was hoping.
[52:55]
I'm hoping to get it off my to-do list before early voting starts, but I'm not entirely certain it'll be.
[53:04]
Meetings management will be ready for launch, not quite sure about the work state.
[53:11]
Well, everything about for the striping, I was kind of like a two-standard, two-standard wits.
[53:17]
We think of them wider or the narrower kind of thing.
[53:20]
That would be the same as what it was.
[53:24]
Okay.
[53:24]
I didn't even know that.
[53:25]
So there's two standard lists?
[53:27]
Yeah.
[53:27]
I learned about years ago, but at the end of the year,
[53:30]
I saw that there's kind of a, yeah,
[53:32]
skinny or one switch.
[53:33]
Which, in your words, I'm sure that's all we've heard of.
[53:36]
Well, I mean, think about it just, I mean,
[53:38]
you know, value it, I guess, because we got some big trucks and stuff.
[53:41]
I see parked out there and that kind of thing.
[53:44]
Public works.
[53:46]
It might actually disturb people from parking some of their larger vehicles.
[53:50]
It's supposed to be parked there a lot. It's a blind person.
[53:53]
Right?
[53:54]
Not you.
[53:55]
It's true.
[53:55]
It's true.
[53:56]
It's true.
[53:56]
It's true.
[53:58]
It's true.
[54:01]
Or there's the Costco size.
[54:03]
We do the Costco size.
[54:06]
I don't pick up the Costco size.
[54:09]
I was told that I was supposed to get a membership to Costco.
[54:13]
Yeah.
[54:15]
Not a bad idea.
[54:17]
But for the city or for?
[54:18]
No.
[54:19]
my wife told me.
[54:23]
All right, it's in a y'all shine that you've blessed us with your presence in the
[54:27]
countryside.
[54:29]
Well since a year ago, we probably have cut down 250 ash trees and got them all hauled
[54:37]
off.
[54:37]
We recently cut down one of the largest trees in town that fell on some of our equipment
[54:43]
in the park.
[54:45]
And I got that taken care of and starting to piece that back together.
[54:50]
Which park?
[54:52]
Nelson Park.
[54:54]
I don't know if that was working.
[54:56]
Two years in a row, some big branches of fallen off and hit that picnic shelter.
[55:00]
And just by true luck, there was nobody in there.
[55:05]
So, no, we don't have to worry about that anymore.
[55:07]
Yeah.
[55:08]
I mean, there's a windless night.
[55:09]
It was a big old night.
[55:10]
I took a chunk out of the roof.
[55:11]
And you can see when you go down there,
[55:14]
stop is gigantic and it's rather rotten. So it was time for it to go. We made an emergency
[55:21]
decision that the tree had to come because the branch of it fallen from wasn't. There was still a good
[55:28]
portion of it up there and it was a very large branch of it right through the rough of the.
[55:34]
I don't want to get hit by it so. Yeah, I think it would have killed somebody.
[55:38]
It went right through the roof and destroyed them. We've put some new frame in it and
[55:44]
I would and singles and holes for move, so to you guys are a good fixing up yourself and
[55:49]
you don't need to hire a contractor, we're going to try to, I'm sorry, I'm not doing
[55:55]
clean.
[55:55]
Could you get this and I'm working on that?
[55:57]
I don't think it's enough.
[55:58]
I think it's a little bit.
[55:58]
Because the biggest question, the biggest cost for us of the city was this re-removal, and so
[56:04]
we're kind of going back and forth, and they're like, well, if you would have left the tree
[56:07]
out, I said that it was a danger, and I will not, it wasn't worth it for an insurance
[56:13]
thing to have a danger, because as we mentioned this was not very
[56:18]
a storm but it was completely, it was a beautiful, a beautiful night.
[56:23]
And so but we are going kind of going back and forth because they don't usually
[56:26]
cover tree removal. They cover debris removal and the tree removal is the largest
[56:32]
cost of the city so far because Sean and his team have been working.
[56:35]
They did all the debris removal and they worked on getting the shelf right
[56:39]
So if insurance is not going to cover the tree removal, I'm not going to cover the deductibles.
[56:47]
It's not, it won't be worth it.
[56:48]
But if you cover the tree removal, then we will be having it in insurance claim.
[56:54]
And then we might do more of it.
[56:57]
Doing a bunch of that in copper sampling that's required every three years.
[57:02]
They've changed the pre-approval process and that's what we've been working through that.
[57:10]
I got nine out of the ten samples.
[57:13]
You can get the temple into more also.
[57:16]
We can look at completing that.
[57:18]
We're going to be putting a well one out of service on Thursday.
[57:23]
That'll probably be out for 48 weeks, depending on what we find in the removal of that.
[57:30]
any thing you basically was that kind of fact water service will be relying on well
[57:37]
two for our water which we did the same thing to that 24 months ago now and we
[57:46]
things have been working great now and I said something so hopefully we get some
[57:53]
rain and things cool off a little bit more use cool down a little bit because we're
[57:56]
over 300,000 a day, which is pretty good flip right now, fiber guys have invaded town this
[58:06]
week, trying to get that done. We're looking at another record year in low-cates, over
[58:12]
2000 low-cates this year, like a good last year, so we're busy doing that. We're doing some
[58:19]
trail modifications in Holbrook Park, in the very northwest corner. We're trying to bring that
[58:26]
to part, also getting rid of some surplus items that we have in the back of the public workshop.
[58:33]
So we've been very, very busy. So the plus we're trying to get another person in here to get hired,
[58:42]
and it's been proven rather difficult. So I think we'll see a lot of social media work by
[58:50]
that, you know, there's supposed to be a position, so that's great.
[58:53]
It's been tirelessly keeping everything upbeat on that, so yeah.
[58:57]
I did actually this time though, I did a little extra research and found out that there's a
[59:03]
Minnesota consortium of community and technical colleges that you can post jobs on.
[59:11]
And since, you know, St. Cloud and St. Paul both have programs that are for furthering
[59:19]
water and wastewater education, not just
[59:21]
entry-level, but furthering as well.
[59:23]
I went ahead and just sent it to them and created
[59:26]
a new profile because it couldn't hurt.
[59:29]
So just trying to target more and more
[59:33]
creative visibility.
[59:35]
Good idea.
[59:36]
Nice.
[59:37]
See what comes with that.
[59:39]
All right.
[59:42]
Great.
[59:42]
Thanks, Sean.
[59:43]
Thank you.
[59:45]
That's Colin Reals.
[59:47]
All right.
[59:48]
The next meeting is going to be on Tuesday, September of 15th.
[59:53]
And the office is closed on Labor Day.
[59:56]
Oh, and then Janette's in posting, but fall clean up.
[1:00:00]
It's in conjunction with City tomorrow coming up as well. What was the day of that, again, is at the Saturday of the 19th.
[1:00:07]
I think City will be the 16th.
[1:00:09]
Saturday.
[1:00:10]
Yeah, they'd be the 19th that was the site if it was the Saturday.
[1:00:14]
So, I'll check out.
[1:00:17]
Check out West website, Alyssa for that.
[1:00:20]
Appreciate almost partnership on that at that.
[1:00:23]
I think, is that new? They've always in the spring when I didn't know that they were doing that.
[1:00:26]
They've done a follow-on just in the last couple years now.
[1:00:28]
the following, a new ad as of these two maybe players about, yeah, it's gonna help you.
[1:00:36]
Just a couple.
[1:00:37]
Okay.
[1:00:38]
Great.
[1:00:39]
It's good to have been.
[1:00:41]
All right.
[1:00:42]
If there's no objection, I'll join the meeting by General Concent.
[1:00:46]
Very none, being as adjourned at 7.33.
[1:00:51]
You're watching LNCC.