Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
These are YouTube's auto-generated captions, not a human transcript — expect occasional errors, especially with names and technical terms.
[0:00]
Okay, good morning everybody. I want to
[0:02]
welcome you to May 14th, 2026, our
[0:04]
regular board meeting held. I'd like to
[0:07]
call this meeting to order. Um, we do
[0:11]
have a quorum on our board today.
[0:14]
And here with us today is Trevor Andre,
[0:18]
our district engineer. Um, Dallas
[0:21]
Henline is our collections
[0:25]
uh
[0:27]
sewer manager. I don't want to say
[0:29]
sewer, but I did. Sorry. Um, Steve
[0:32]
Clark, our water manager. Uh, Andrew
[0:34]
Sumption, our HR. Jeff White, trustee.
[0:38]
Mick Sudbury, trustee. Danny Stewart,
[0:40]
trustee. Le Fitzgerald is um our
[0:44]
controller. And our legal counsel is
[0:46]
Nathan Bracken, and Clint Dilly is
[0:49]
excused. Uh, will you guys all please
[0:52]
stand and with me at the pledge of
[0:54]
allegiance?
[0:57]
I aliance to the flag of the United
[1:01]
States of America and to the republic
[1:03]
for which it stands. One nation under
[1:06]
God, indivisible, with liberty and
[1:09]
justice for all.
[1:11]
>> Thank you.
[1:15]
And also I'd like to welcome public and
[1:18]
guest. Um does anybody here have a
[1:22]
conflict what's on our agenda today?
[1:25]
Seeing none. Anybody would like to
[1:27]
address the board today,
[1:30]
Dan?
[1:32]
>> I think we're doing great.
[1:33]
>> Okay, Doyle.
[1:37]
>> Everything's good.
[1:39]
>> Water.
[1:40]
>> Yeah, we apprec we appreciate taking
[1:42]
your time out and coming. And uh so
[1:46]
we're going to move on to item F.
[1:49]
Let me make sure I'm not screwing up
[1:51]
because yesterday I was in a meeting and
[1:52]
I bypassed stuff. So, um,
[1:57]
do you want to you want to take this?
[1:58]
>> Yeah. We're going to skip to the bottom
[2:00]
and go with Kim first so that she can go
[2:03]
back out to her customers. You want to
[2:05]
stand, Kim? Uh, we're excited to have
[2:08]
Kim in here. So about a month and a half
[2:11]
ago, they decided that they wanted to
[2:14]
really make a push on getting autopay
[2:16]
set up for as many customers as possible
[2:19]
to try and cut down on the amount of
[2:22]
phone calls that were coming in. And so
[2:25]
they challenged themselves that whoever
[2:27]
could get the most uh people signed up
[2:30]
on autopays. They between Kim, Mandy,
[2:35]
and Katie, they signed up over 50 new
[2:38]
customers on autopay, which really cuts
[2:41]
down on a lot of
[2:43]
>> delinquencies,
[2:46]
uh, notices, and things like that. Um,
[2:48]
so maybe Le could talk a little bit
[2:50]
about how it helps. you you said
[2:53]
probably everything we need to say, but
[2:54]
yeah, obviously when people sign up for
[2:56]
autopay and have money in their bank.
[3:00]
It does it cuts down on delinquencies
[3:02]
and phone calls and just more work for
[3:05]
us. So
[3:06]
>> So Kim was the one that did the most.
[3:09]
She had 22 of the 51. Wow.
[3:13]
>> And so we just wanted to recognize her
[3:14]
for her efforts with all of our
[3:16]
customers with a gift card.
[3:17]
>> Y Thank you.
[3:24]
little competition.
[3:25]
>> Thank you.
[3:26]
>> Appreciate you.
[3:28]
>> Look at Manny.
[3:30]
>> What are you doing?
[3:33]
>> Thanks, Kim.
[3:36]
>> Okay, up next we have we have Dawson.
[3:39]
Uh Dawson's on our uh water construction
[3:42]
crew. He just completed his collections
[3:45]
two cert certification. Um Dawson's been
[3:48]
making a push lately to learn as much
[3:51]
about this the collection side of things
[3:53]
as possible. He spent a couple weeks
[3:55]
with their crew and is preparing himself
[3:57]
to be able to be an on call operator.
[3:59]
Thanks to
[4:01]
>> Thanks to
[4:05]
Mark Manzanerys, he was unable to make
[4:07]
it today. Um he's out
[4:09]
on the camera van was couldn't pull
[4:11]
away. Uh he completed his water
[4:14]
distribution one. He's on our
[4:16]
collections crew. Uh it's always good to
[4:18]
see those operators going outside of the
[4:20]
uh area that they specialize in and
[4:24]
learn more about the district. So that's
[4:27]
Mark Manzanerys. Um Jean Stock, he
[4:31]
wasn't able to make it. He's out getting
[4:33]
all of our fire extinguishers reertified
[4:35]
for the year. And so he's got a
[4:38]
>> and he could take 10 minutes to come in
[4:39]
here.
[4:40]
>> He's got a guy coming out that he
[4:41]
couldn't leave alone. Um he just
[4:44]
finished up his qualified water
[4:45]
efficient landscaper certification. Um
[4:48]
that's a big deal. We're excited about
[4:51]
that. He's learned how to handle our
[4:54]
garden area so that we can keep it as
[4:57]
efficient as possible as well as be a
[4:59]
good steward and an example to the
[5:02]
public on how to do these things. Um and
[5:05]
then Ed Tucker, he just finished up his
[5:09]
traffic control technician. Ed's kind of
[5:10]
our go-to flagger. Um, when we get the a
[5:16]
job out there where we need all hands on
[5:18]
deck, we kind of lean on Ed. And so him
[5:20]
getting that is a is a big deal. He
[5:22]
couldn't come in. He's doing CIP. Um,
[5:25]
but nobody wants to come see the board.
[5:28]
I think that one was a Steve that was a
[5:30]
Steve decision on the CIP.
[5:33]
>> That one's kind of a plant decision.
[5:35]
When it has to be done, it has to be
[5:37]
done.
[5:37]
>> Trevor, what's going on?
[5:40]
So, those are our employee recognitions
[5:42]
for today. We're excited about all of
[5:44]
them, though.
[5:45]
>> Awesome.
[5:45]
>> That's awesome.
[5:47]
>> Congratulations.
[5:50]
>> Okay, let's move on to item G. Who's
[5:52]
going to do this one? You, too.
[5:53]
>> I'll take part of it and we'll lean a
[5:55]
little bit on the employees as well as
[5:58]
their managers. Um, first we have
[6:00]
Melinda Campbell. Um, she's our newest
[6:03]
office staff. You want to stand,
[6:04]
Melinda?
[6:05]
>> There's a microphone right there.
[6:07]
>> Do I need the microphone? Yes, you. Yes,
[6:09]
you do. So, I can hear what you're
[6:10]
saying.
[6:11]
>> So, so the so the microphone can pick
[6:13]
you up here. So, we're excited about
[6:16]
Melinda. She comes with a lot of
[6:17]
customer service experience as well as
[6:19]
some leadershipship experience. She's uh
[6:23]
been a great fit in the office. She's
[6:26]
really dug in and learned a lot and
[6:30]
she's expanding that role every day. Uh
[6:32]
do you want to take a minute just tell
[6:33]
us a little bit about yourself?
[6:35]
>> Um like you said, my name is Melinda
[6:37]
Campbell. I used to be the cheer coach
[6:40]
at Cypress for many years and I retired
[6:44]
from that and looked for a big girl job.
[6:47]
So, I got my big girl job now. So, um
[6:51]
I'm excited to be here. Uh my son is
[6:54]
graduating from the fire academy today,
[6:55]
so I'm really excited about that.
[6:57]
>> Yeah. Nice.
[6:58]
>> Thanks, Melinda.
[7:03]
» Up next, what time is that today?
[7:08]
out to.
[7:10]
>> Thanks, Linda. Up next, we have Cameron
[7:14]
Peterson. Uh Cameron
[7:18]
comes from us from the country. Uh he
[7:20]
grew up in a small town, which is kind
[7:23]
of exciting for me to have another hick
[7:27]
here. Um, but what really excites us
[7:31]
about Cameron is his willingness to
[7:33]
learn, his work ethic, and the fact that
[7:36]
he came in with already having a CDL,
[7:38]
which means he can jump into a lot of
[7:41]
the things that some newer employees
[7:43]
can't when he first got here. Why don't
[7:45]
you introduce yourself a little bit?
[7:48]
>> Yeah, thanks, Andrew. And yeah, I'm
[7:50]
Cameron. I'm really excited to be here.
[7:53]
I appreciate being here.
[7:55]
There's not a whole lot the city just
[7:59]
getting used to it and
[8:01]
yeah, I appreciate the opportunity and
[8:03]
I'll give it my best.
[8:05]
>> Thanks. Got anything to add, Dallas?
[8:07]
>> I would just say Cam's finishing up his
[8:08]
second week. Um he's been thrown into a
[8:11]
pretty labor intensive job that we're on
[8:13]
right now and um he's sticking right
[8:15]
with the guys and they've reported back
[8:17]
that he's fitting in good which is
[8:18]
important and we're real excited about
[8:20]
it.
[8:21]
>> Thank you.
[8:21]
>> Thanks.
[8:22]
>> What What made you earn a CDL? What were
[8:24]
you doing before that?
[8:27]
>> Um,
[8:29]
really just the opportunities and
[8:32]
getting something under my belt that I
[8:35]
can have to
[8:37]
>> So, you weren't doing over the road or
[8:39]
anything like that?
[8:39]
>> No, he jumped into Slick, the community
[8:42]
college, and paid for it and got it all
[8:44]
on his own.
[8:44]
>> Yep. I actually graduated the day of my
[8:48]
interview, so yeah, I'm pretty new to
[8:50]
it, but
[8:51]
>> that's good to have.
[8:52]
>> Thanks, Cam. Well, welcome. Glad to have
[8:54]
you.
[8:55]
>> Thank you.
[8:59]
» And up next, our newest employee, Trevor
[9:01]
Ratcliffe. He just joined the water
[9:02]
construction crew. Um Trevor came uh
[9:06]
with strong reference from Gavin
[9:10]
Henshaw, one of our uh employees. It's
[9:14]
always good to have employees that are
[9:16]
referencing somebody to give us a idea
[9:18]
of who that person might be. Um, why
[9:21]
don't you tell us a little bit about
[9:22]
yourself, Trevor?
[9:24]
>> My name is Trevor Ratcliffe. Grew up
[9:26]
here in Magnum my whole life. I like
[9:28]
going hunting and I'm excited to be
[9:30]
here.
[9:32]
>> You got anything to add, Steve?
[9:34]
>> Oh, like I say, he's only been here a
[9:36]
week, but we're excited to have him. I
[9:39]
mean, he's already fitting in great with
[9:41]
the guys, so I think
[9:42]
>> we got Magna. Yeah, another Magna guy.
[9:45]
Thanks, Trevor.
[9:50]
That's it for our new employee
[9:51]
introductions. We're excited to have
[9:53]
them all though.
[9:54]
>> See you guys.
[10:02]
» Oh. Oh, sorry. Okay. Moving on. Approval
[10:06]
of common consent items.
[10:09]
>> This is the regular board meeting held
[10:11]
April 9th, 2026. Expenses from April 1st
[10:15]
to May 6th, 20
[10:17]
26.
[10:19]
General expenses 2,26,4483
[10:25]
science bank bond payment 1,336,99729.
[10:32]
» I'll second it.
[10:33]
>> It's been motion second. All in favor?
[10:35]
>> I.
[10:36]
>> Thank you. Let's move on to our uh
[10:38]
department report. Let's move on to
[10:41]
general manner manager report. Trevor
[10:43]
Andrews filling in.
[10:44]
>> Yep. I'll cover that. So, just a few
[10:48]
things on here. Andrew is going to go
[10:50]
over staffing. So, I'm going to jump
[10:52]
from there into operations.
[10:56]
Um, as you know, we've been using reuse.
[10:59]
That's been going well. Um,
[11:03]
the parts for the copper club secondary
[11:06]
extension, those are been ordered and
[11:09]
just waiting on those before the
[11:11]
construction crew will start
[11:14]
uh building that.
[11:16]
And then want to jump over to the office
[11:21]
portion.
[11:23]
Um, we worked with Yappify
[11:27]
to put in an application for a grant.
[11:30]
It's the transparent water billing grant
[11:33]
and that will help pay for the AMI uh
[11:37]
kind of customer portal that we have
[11:39]
with Yapplify. So, if we get that grant,
[11:41]
it'll cover 50% of the cost for 3 years,
[11:44]
which is pretty significant.
[11:47]
Um, and they just look for wanting
[11:51]
information at the end of the year, you
[11:53]
know, looking at did it change the water
[11:55]
use, you know, things like that. So, um,
[11:59]
we'll let you know if that comes
[12:00]
through.
[12:01]
>> Hey, Trevor, I got to ask you a
[12:02]
question.
[12:02]
>> Yeah.
[12:03]
>> I had a resident from Murray called me
[12:05]
yesterday for the Jordan Valley. So the
[12:08]
question I have, do we have a deal
[12:10]
that's on our computers that let's just
[12:13]
say if somebody's really using a lots to
[12:16]
lots of water, does do we have something
[12:18]
that actually bings our computers out
[12:20]
here letting them know that that people
[12:22]
because this this deal that happened
[12:24]
over in in Murray through Jordan Valley,
[12:27]
it went for 6 months before
[12:32]
they caught it.
[12:33]
>> Yeah. So this once we have that AMI
[12:36]
customer portal, we can set those
[12:38]
notifications and the customer will be
[12:41]
able to set their own as well.
[12:42]
>> And I think that would be really good
[12:44]
because there was,
[12:46]
>> you know, six months.
[12:47]
>> So So I'll add I don't think it would
[12:49]
ever go 6 months because of the way
[12:51]
Leo's uh office runs it. Maybe she can
[12:54]
talk about what they do.
[12:55]
>> We just get all the usages once a month,
[12:58]
right? So if it's over a 100,000 gallons
[13:01]
of usage, then we notify the customer to
[13:04]
set up a leak check.
[13:06]
>> Okay.
[13:06]
>> Um so but if they don't respond to our
[13:09]
notices or anything, then there's no way
[13:12]
we can check for a leak.
[13:13]
>> Right. Right.
[13:14]
>> But if they do, then we'll set up an
[13:16]
appointment with our guys and they'll go
[13:17]
out and do a leak check. I
[13:18]
>> I'm wondering if we need to send out a
[13:20]
reminder. I had three people this last
[13:22]
month
[13:23]
>> had overflows going over because the
[13:25]
float changed.
[13:26]
>> Yeah. One of them had to replace the
[13:28]
whole float. The other ones were just
[13:30]
adjustment. People don't even realize
[13:32]
that water is just going over the whole
[13:34]
float.
[13:34]
>> The toilet.
[13:35]
>> Yeah. Yeah.
[13:36]
>> Maybe we need to send out a reminder.
[13:38]
Can we do that with the building?
[13:40]
>> Yeah. Yeah. Yeah.
[13:42]
>> If was she'd remind them,
[13:44]
>> huh?
[13:45]
>> If Vie was here, she would. Virginia.
[13:49]
Well, I'm just saying that we ought to
[13:50]
maybe put something in our billing and
[13:53]
just remind people to check the floats
[13:55]
because that's so silent they don't even
[13:57]
know it.
[13:58]
>> And I had that happened to my brother,
[13:59]
too. His house, he had like three of his
[14:01]
toilets out of four were like going over
[14:03]
and he couldn't understand. And Raymond
[14:05]
went up there and looked at all the
[14:06]
income to find out why they went inside
[14:08]
and the toilets the overflow.
[14:10]
>> I was just saying if you get 3,000
[14:12]
gallons, that's a little too late, isn't
[14:14]
it?
[14:15]
>> Yeah. 100,000 gallons is a lot.
[14:18]
>> I thought it was 3,000.
[14:19]
>> No, no, no. We do over a 100,000 in one
[14:22]
month. I mean, that's a lot.
[14:25]
>> But with this new system, it'll ping
[14:27]
them.
[14:28]
>> Yeah.
[14:28]
>> Continuous use or
[14:30]
>> This is us manually doing it. But with
[14:32]
the new system, it'll be automatic and
[14:34]
they could set their own. Like I
[14:36]
average$7,000
[14:38]
a month. So, if it goes over that, let
[14:40]
me know. Yeah. You know, something like
[14:42]
that.
[14:43]
>> So, they'll have a lot more control. And
[14:45]
we'll also be able to set our own, you
[14:48]
know, more
[14:49]
>> custom
[14:51]
>> alerts.
[14:52]
>> Right now, it's all manually.
[14:54]
>> I think it's really important because
[14:55]
it's going to save a lot of headache,
[14:57]
especially on sprinkler systems where
[14:58]
they've got sticking valves and things
[15:00]
like that
[15:01]
>> because it goes in the ground and they
[15:02]
don't ever see it.
[15:03]
>> That's going to be great.
[15:05]
>> Yeah.
[15:07]
Um, next we'll jump down to
[15:10]
communication and morale. Um,
[15:14]
I'll just mention these and then Andrew
[15:16]
and Steve can talk a little more about
[15:18]
it, but they've done a couple of uh
[15:21]
visits to schools. They did a elementary
[15:24]
school assembly and then they had um a
[15:29]
career day at Lacidge Elementary. So,
[15:31]
I'm going to pull up some pictures of
[15:33]
that and they can discuss kind of what
[15:35]
was going on there.
[15:38]
I think we need to I think we need to
[15:41]
start visiting the schools a little more
[15:43]
often to give some prospective
[15:47]
employees.
[15:47]
>> Yeah. I think I think the presentations
[15:50]
that we prepared for this one partic
[15:53]
this one that we did last Friday in
[15:55]
particular we could start to reuse and
[15:59]
start going to these schools more
[16:00]
frequently.
[16:01]
>> Well, I think it's important to do that.
[16:02]
In fact, I'm with the city. We're we
[16:05]
want to engage in the schools, you know.
[16:07]
So, I think this would be important that
[16:09]
we could engage in with all the schools
[16:12]
if we can, especially at the younger
[16:14]
level. I don't know how much the high
[16:16]
school people, but I think from the
[16:19]
junior highs down
[16:20]
>> would be a big plus.
[16:23]
>> They seem to be more receptive in the
[16:24]
elementary, I think.
[16:26]
>> Yeah.
[16:26]
>> Especially like the third to sixth grade
[16:29]
age range. They were
[16:30]
>> right.
[16:31]
>> They really enjoyed it.
[16:33]
>> So, these pictures You flip through
[16:34]
first. These are at Lakeridge Elementary
[16:38]
career day that we did on Tuesday. Uh
[16:41]
Steve's crew and uh
[16:43]
>> Ty went and set up a booth as well as
[16:46]
some people outside showing equipment
[16:48]
and they had a chance to talk to all the
[16:49]
employee all the kids came through each
[16:52]
class one by one and they were able to
[16:54]
explain a little bit about what we do
[16:57]
here at Magna Water and how the water
[17:00]
gets to them. It was a pretty positive
[17:02]
experience. They spent from 1:00 till
[17:05]
3:15 that day
[17:07]
>> meeting with children and it was pretty
[17:09]
exciting. Um then on Friday last week uh
[17:14]
we teamed up with Jordan Valley and me
[17:17]
and Steve went and spoke to an assembly
[17:20]
of kids. They had two assemblies. Um we
[17:23]
spoke at both of them and we talked
[17:26]
about water conservation. Steve taught
[17:28]
them how water gets to their houses and
[17:31]
what we do here. And I was able to talk
[17:34]
to them a little bit about the different
[17:36]
jobs here at Magna Water and
[17:41]
what the possibilities are for them if
[17:43]
they decided that this was the route
[17:44]
that they'd like to go. They liked it so
[17:47]
much that they're already trying to
[17:50]
invite us back out. So,
[17:52]
>> it's pretty exciting.
[17:54]
>> Yeah. Last month, Adobe Rock had a
[17:57]
>> open open house. And all I heard the
[18:01]
kids say, I got to go crawl up on the
[18:03]
loader and honk the horn.
[18:07]
>> Talk about stimulating cells.
[18:10]
>> That's good. That's good.
[18:11]
>> I think that's really good.
[18:13]
>> Yeah, I think it went well.
[18:14]
>> Yeah. Do we take any like any little
[18:18]
gadgets to give?
[18:19]
>> So, we're going to order some next week
[18:21]
to start handing out. We handed out some
[18:24]
candy at the Lacage event. Um, at this
[18:28]
event, it was such short notice that we
[18:30]
didn't have time to get anything ordered
[18:32]
that we went and spoke to the assembly.
[18:33]
But, uh, we're we're planning on getting
[18:36]
some stickers and some pencils and stuff
[18:38]
to hand out of these and we look forward
[18:41]
to doing some more in the future.
[18:43]
>> Mhm.
[18:44]
>> That's really nice.
[18:46]
>> Okay, that's all I had with the managers
[18:49]
report.
[18:50]
>> Thank you, Trevor. Now, it's your turn
[18:52]
again. Yep. Okay, we'll go into the
[18:55]
engineering report. So, just some
[18:58]
progress updates. Influent pump station.
[19:01]
Um, moving along. Well, I wanted to just
[19:03]
bring up a few pictures here because
[19:05]
there's some pretty significant
[19:08]
uh you know,
[19:11]
progress there. This is the grit
[19:13]
building with those classifiers. There's
[19:16]
the two of them. A lot of intricate
[19:17]
piping that's in there. There'll be a
[19:19]
platform here in the center.
[19:22]
Do they run simultaneously or do they
[19:24]
alternate?
[19:25]
>> It's one in one. So redundancy and we
[19:28]
usually go six months between
[19:32]
» and then another significant well we'll
[19:35]
just go into this is also part of the
[19:37]
grit. This is the grit separator. They
[19:41]
did some work down below that grading
[19:43]
and then um up here on top with the pump
[19:46]
and motor that takes the grit to that
[19:50]
grit classifier that we just looked at.
[19:52]
Um some other things that have been
[19:54]
happening is uh the screw pumps. They
[19:56]
grouted those. So they've got them
[19:58]
formed up here. Just a few pictures of
[20:01]
that. And then we'll watch a a short
[20:03]
little video of that process
[20:08]
trying to find which one is the best.
[20:11]
might be this one. Uh pretty pretty time
[20:14]
consuming. They they mix up grout, they
[20:17]
put it in this little hopper, and then
[20:18]
drop it basically right down onto the
[20:22]
um
[20:24]
right down onto the screw
[20:26]
>> on the augur.
[20:27]
>> And the screw
[20:28]
>> that close up the gap, Trevor.
[20:30]
>> Yeah. What that does is it fills the
[20:33]
space in between, you know, what they've
[20:35]
already poured and the screw. And the
[20:38]
screws just run and pull that up, you
[20:42]
know, and they just kind of move this up the screw as they go.
[20:48]
>> Imagine that uh wears out the concrete.
[20:53]
>> Well, once it once it's complete,
[20:56]
um I think this one's actually moving.
[20:59]
Yeah. So, once it's complete, what they
[21:01]
did was weld a a small little quarter
[21:03]
inch bead around that entire screw
[21:05]
>> on the auger.
[21:06]
>> Yep. And once this grouts in and dries,
[21:09]
then they remove that so there's that
[21:12]
small gap there so it's not rubbing
[21:14]
>> on it.
[21:16]
>> Yep. Yep. So
[21:19]
>> So I I've got some stuff I picked up.
[21:21]
>> Like here's a pretty good picture of
[21:23]
that.
[21:24]
>> Oh yeah.
[21:26]
>> So
[21:27]
>> have you ever heard of sewer coat?
[21:30]
I picked up a couple pallets of that and
[21:32]
they use it to repair manholes and stuff
[21:35]
and it is some tough grout. I'm called
[21:38]
sewer coat.
[21:39]
>> Okay.
[21:40]
>> Yeah. So, they got all three of those
[21:42]
done last week. Um, successful,
[21:46]
worked really well, and so that's just
[21:49]
getting much much closer to being a
[21:51]
fully functional pump station. So, it's
[21:54]
pretty exciting.
[21:56]
um Hannes well number eight. We've got a
[21:58]
pre-construction meeting um next week.
[22:02]
So that will get going here and we'll
[22:06]
probably be, you know, breaking ground
[22:08]
with that drill in the well this month.
[22:11]
Um working on the grant application
[22:14]
right now. We've got that about 90%
[22:17]
complete, which basically we'll just
[22:19]
turn everything in, make sure the EPA is
[22:21]
okay with everything we've turned in,
[22:23]
and then that grant will be awarded. Um,
[22:26]
so that's that's exciting. That's
[22:28]
moving.
[22:30]
Um, some other things, the change house
[22:33]
or operations building at the WRF is
[22:37]
it's out to bid right now. It closes on
[22:39]
May 21st next week. We had quite a few
[22:42]
contractors that were uh they came to
[22:46]
our mandatory pre-bid, which means
[22:48]
they're the only contractors then that
[22:50]
can bid on that. Um
[22:52]
>> we had quite a few.
[22:54]
>> Yeah, I want to say there was six, seven
[22:56]
of them.
[22:57]
>> Wow.
[22:57]
>> Pretty good interest. Um some questions
[23:01]
so far, but I think that's going well.
[23:04]
So, we'll see how that shakes out next
[23:07]
week and we'll bring that to the board
[23:08]
in June.
[23:11]
um secondary reservoir in zone three
[23:14]
that has been cruising the last month.
[23:17]
Got a few pictures here of that. This
[23:21]
don't have a lot of in between pictures,
[23:23]
but I can show you kind of the beginning
[23:25]
and the end. Um so this was pretty close
[23:28]
to right at the beginning. Um you can
[23:32]
see they're just barely starting to
[23:34]
scrape that down. Um, and then as we
[23:39]
move, this is about a month later.
[23:41]
They've moved quite a bit, but you can
[23:42]
see there's lots of water, which they
[23:45]
dealt with a lot of water down in the
[23:47]
hole throughout.
[23:49]
>> That's crazy. All them springs.
[23:51]
>> But now we're moving into this was a few
[23:53]
weeks ago. Um, they've got it fully dug.
[23:57]
They've got liner in. That's what this
[24:00]
is going in there.
[24:01]
>> What's the white? That looks like a
[24:03]
bunch of seagulls there. Uh they've just
[24:05]
got bags
[24:06]
>> pulling it blowing.
[24:07]
>> Yeah.
[24:08]
>> So Trevor, I got a question. You know
[24:09]
how they have all that problems up there
[24:11]
and I actually I went Don took me up
[24:13]
there last week and we tooured it and
[24:15]
everything. Pretty impressive. But the
[24:17]
question where you have all that ground,
[24:19]
you know, all them springs. Can that
[24:21]
water be some way used to go into this pond or
[24:27]
>> So we have a it's complicated. It would
[24:30]
be um we have a change application with
[24:32]
Kennott to bring spring water to our
[24:34]
zone two.
[24:35]
>> Okay.
[24:36]
>> Um but we don't really know where the
[24:38]
origin of these ones is. You know, where
[24:40]
this spring is coming from. So it would
[24:43]
probably take investigating where that
[24:44]
is, finding out whose water,
[24:47]
possibly water right issues, things of
[24:50]
that nature. So
[24:51]
>> it just comes
[24:53]
in a trench and put a perforated pipe in
[24:55]
like we do in a drain field. Right now
[24:57]
we have that around the reservoir. Um
[25:00]
and it takes it out and it just
[25:02]
discharges it in our basically where we
[25:04]
would overflow by that holly drilled
[25:07]
that spring used to be right up there by
[25:09]
them trees.
[25:10]
>> Okay.
[25:10]
>> And there was some troughs there and it
[25:12]
there was quite a bit of water coming
[25:13]
out of it.
[25:13]
>> I remember we went up there that time.
[25:15]
>> Well, that's one below there and there
[25:17]
right by that holly road and them trees
[25:19]
are there. That's where they watered the
[25:20]
cows.
[25:21]
>> Okay.
[25:22]
>> There is a big spring right there.
[25:24]
>> This is coming through the ground. So,
[25:26]
we don't know if it originates from that
[25:28]
or somewhere completely,
[25:30]
>> but yeah, we're capturing and you know,
[25:32]
so it doesn't affect our reservoir.
[25:35]
>> And I know that spring is up at the top
[25:37]
of there.
[25:38]
>> So,
[25:39]
>> do they just overlap, Trevor, or do they
[25:41]
fuse it on?
[25:43]
>> They they overlap them and they put a
[25:45]
little vent
[25:47]
uh between the two layers and then that
[25:49]
when that gets wet.
[25:50]
>> That's pretty neat. I was watching them
[25:51]
do that and they were pretty close to
[25:52]
being done. Um, so there's kind of the
[25:54]
two sides of the reservoir. This is
[25:57]
continuing that progress as they buried
[25:59]
some of that liner
[26:02]
and then they're here. They are putting
[26:05]
some rock around the edges
[26:08]
and Dallas was able to get out there and
[26:10]
drone. So, we got a a couple, you know,
[26:13]
aerial views here. You know what I'd
[26:16]
really like you guys to do is get these
[26:17]
pictures and I'd like to I would like to
[26:20]
have them, you know, made up into
[26:23]
frames. And I think some of these
[26:25]
projects we're doing, I think we need to
[26:26]
put them on our walls just, you know,
[26:30]
>> or have it or have it have a screen and
[26:33]
have it run through it.
[26:34]
>> Right. Right. Right.
[26:35]
>> Stand there. And it'd be it'd be
[26:37]
important to see some of this stuff on
[26:39]
our walls like down that hallway cuz
[26:41]
when I go over to other districts, they
[26:43]
have all that stuff and I'd like to see
[26:45]
that happen.
[26:48]
» We'll do that. So, speaking of this
[26:51]
project and site visit, I know Mick was
[26:53]
out there. He looked at it. We were
[26:55]
wanting to see if the board would would
[26:57]
like to visit it possibly before the
[27:00]
June meeting next next month
[27:05]
if there's interest in that.
[27:08]
>> I don't know.
[27:09]
>> Should we plan?
[27:10]
>> I haven't even been down ser
[27:12]
>> plan for that. I mean, I think we could
[27:14]
do it just before the meeting, you know,
[27:16]
maybe it's around 9 or so or 9:30 or
[27:19]
>> Everybody says, "When are they going to
[27:20]
put the fish in here?" And I said,
[27:21]
"There's no fish. This ain't a fishing
[27:24]
pond
[27:24]
>> and hopefully they don't grow in there.
[27:26]
You know,
[27:28]
>> should be getting some pretty clean
[27:29]
water. So, just a little update on that.
[27:32]
Uh
[27:33]
>> morning before the uh
[27:35]
>> June meeting,
[27:36]
>> second Thursday.
[27:37]
>> Yeah, if we could plan for that and
[27:39]
>> a little bit of coffee and donuts.
[27:41]
>> Sure.
[27:42]
>> Don't need no donuts.
[27:44]
>> Um other things, lead and copper,
[27:46]
>> dilbert,
[27:48]
>> lead copper service replacements been
[27:50]
going well. They've just been moving
[27:52]
around the city. Um they've completed
[27:55]
9100 including pavement. Um moving on to
[27:59]
other areas. 8950 is one of those. But
[28:02]
that's been overall a really good
[28:04]
process. The homeowners have been, you
[28:08]
know, really receptive
[28:10]
um helping us get through that. So that
[28:14]
is the end of the engineering report.
[28:16]
>> Thank you, Trevor.
[28:17]
>> Yep.
[28:19]
>> Okay, moving on. Let's move over to
[28:23]
We're going to move over to you, Steve.
[28:25]
>> All right. Thank you, board chair. Um,
[28:28]
so the water production summary for the
[28:30]
month of April, as far as culinary goes,
[28:33]
we've produced 113.06
[28:37]
million gallons or 347 acre feet. That's
[28:41]
a 2.82%
[28:43]
decrease from 2025.
[28:46]
Year to date, we've produced 418.7
[28:50]
million gallons for 1,285.03
[28:54]
acre feet. That's a 1.2 29% increase
[28:59]
from 2025 year to date. So far, year to
[29:03]
date, we purchased 263.66
[29:07]
acre feet of water from Jordan Valley.
[29:10]
And the secondary water production um
[29:13]
for April was 16.22. 22 million gallons
[29:17]
or 49.8 acre feet. That's a 29.14%
[29:22]
decrease from 2025.
[29:26]
Year to date, we've done 20.84 million
[29:29]
gallons or 63.96
[29:32]
acre feet.
[29:34]
That's a 0.55% decrease from 2025.
[29:39]
As far as call outs go, we had a total
[29:43]
of 13. 10 of those were water. Three of
[29:46]
them were wastewater for a total of 39
[29:48]
hours. 30 that were water and nine were
[29:52]
wastewater.
[29:53]
We had three service line leaks and then
[29:56]
10 miscellaneous call outs.
[30:00]
Um, that's all I have unless you have
[30:02]
questions on any of it.
[30:05]
>> You have any questions, Jeff?
[30:07]
>> Thanks, Steve.
[30:09]
K Dallas,
[30:10]
>> Mr. Chairman, thank you. Just go over
[30:12]
quickly the water reclamation facility
[30:15]
operational support for April. The
[30:17]
plants running really well. The reuse
[30:19]
system is fully operational. We pumped
[30:22]
just about 13 1.5 million gallons up to
[30:25]
the reservoirs during the month of
[30:27]
April. Um BOD and TSS removals still
[30:31]
really high at 98%.
[30:33]
Um wasting rate is maintained. Daily
[30:36]
average plant flow is about the same.
[30:38]
We're running about 2.8 million gallons
[30:40]
per day right now. And then u the
[30:42]
treatment crew completed a scheduled
[30:45]
service interview or interval on our
[30:47]
Hubra fine screens. There were some
[30:48]
wearable rollers that needed to be
[30:50]
replaced. And then while we had the
[30:52]
system down, we replaced some of the
[30:54]
worn fittings from steel to stainless
[30:57]
steel just to improve durability and
[31:00]
long-term reliability. And then right
[31:03]
now we're averaging an annual average of
[31:05]
1.03
[31:07]
on the total phosphorus. So we're still
[31:10]
looking really good towards our annual
[31:11]
average that we need to be under 1.0. Um
[31:15]
on the collection system side, we're
[31:17]
starting the acoustic inspection with
[31:19]
SLR wrap the last week of May. That'll
[31:22]
probably take two to three weeks of
[31:24]
work. Um, and then right now as far as
[31:27]
the Vector location through the town,
[31:29]
we're below Magnum Main Street and
[31:32]
working our way from 9200 to 8,400. And
[31:35]
then with the camera van, we're just up
[31:38]
above 35th Souththeast of 8000 up near
[31:42]
Belfast and working our way back down to
[31:44]
35th.
[31:45]
>> Great.
[31:45]
>> So, any questions?
[31:47]
>> Nope. I seen him out there um
[31:48]
jackhammering around all the
[31:51]
>> So
[31:51]
>> yeah, we got to get some of those
[31:52]
manholes that get paved over up before
[31:54]
we do the inspection. So that's right.
[31:56]
>> Which numbers on our phosphates on the
[31:58]
chart?
[31:59]
>> Total phosphorus um it'll be
[32:03]
>> just in the bottom on the monthly
[32:04]
highlights
[32:06]
>> on the
[32:07]
>> effluent total FOS currently trending at
[32:10]
1.03.
[32:12]
>> And what's our
[32:14]
>> 1.0 zero is the annual average. Now that
[32:16]
we're into the reuse season, every
[32:19]
gallon of water that we send up is we
[32:21]
get an equivalent pounds of phosphorus
[32:23]
credit back.
[32:24]
>> Okay.
[32:25]
>> So,
[32:25]
>> uh do we have a guideline or do you have
[32:28]
a limit on that?
[32:29]
>> Uh
[32:30]
>> state established a limit on phosphorus.
[32:32]
>> Yeah, the state the permit requirement
[32:34]
is 1.0 as an annual average. Um, so for
[32:38]
example, last year we ended at about
[32:41]
1.3, but with our total FOS credit, we
[32:44]
ended up at like 0.85.
[32:46]
>> How do you get a FOS credit?
[32:47]
>> Because the reuse water that goes up to
[32:50]
the town isn't discharged to our regular
[32:52]
discharge waters.
[32:53]
>> That's good.
[32:54]
>> That's why reuse is so important.
[32:55]
>> A lot of credits.
[32:57]
>> How many credits do you usually get?
[32:59]
>> Last year we it was almost point4.
[33:02]
>> Oh my in credit.
[33:03]
>> That's good. That's why we try to
[33:05]
prioritize the reuse water so heavily.
[33:08]
>> Everybody I know that's on it loves it.
[33:10]
>> We love it. It's really good.
[33:12]
>> No fish, no scales,
[33:14]
>> no plugs.
[33:15]
>> Yeah. Less filter cleaning.
[33:17]
>> Yeah.
[33:17]
>> And that's all I have, Mr. Chairman.
[33:19]
Thank you.
[33:19]
>> Okay. Thanks, Dallas.
[33:21]
>> Okay, moving on. Let's go over to uh Le,
[33:25]
our controller.
[33:26]
>> Thank you, Mr. Chair and board. Um, so
[33:29]
the first item on my agenda is the legal
[33:32]
requirements. um report. I wanted to let
[33:36]
you know that I've changed the form a
[33:37]
little bit. It used to have another
[33:39]
column on the end that was next due
[33:42]
date. So, if we completed something in
[33:45]
26, that date would show in 27. But I
[33:48]
thought this might be a little bit
[33:50]
easier to read. It has date completed
[33:53]
and the due date. So, it shows if it's
[33:56]
blank, that doesn't mean it's it means
[33:58]
it's not done. And then it then with the
[34:01]
due date you can see, oh, were we late
[34:02]
or were we early? Were we on time? So
[34:06]
anyway,
[34:06]
>> I like that.
[34:07]
>> Yeah, I I thought it was easier to read.
[34:09]
But what's coming up is uh our annual
[34:13]
filing requirement to the state
[34:14]
auditors, our 2025 financial statements.
[34:19]
The auditors came out the first of this
[34:21]
month and got all their field work in
[34:23]
one day. And so
[34:26]
we're anticipating having the report
[34:28]
presented to the board next month. So
[34:30]
that'll be able to be reported to the
[34:32]
state by June 30th. And then the blues
[34:35]
are the items that were finished by the
[34:38]
end of April. Um we got reported
[34:40]
everything we needed to to the
[34:42]
transparency website. The WWTP
[34:46]
annual bioolids report to the state
[34:49]
Dallas got that completed.
[34:51]
um
[34:53]
our registry that we have to file every
[34:55]
year to and pay $25 to just update our
[34:58]
registry with the lieutenant governor's
[35:00]
office. That's done.
[35:02]
Um we got our first quarter payroll or
[35:05]
yeah payroll reports completed.
[35:08]
The municipal wastewater planning
[35:10]
program report that is another agenda
[35:12]
item later today. Uh the publishment of
[35:17]
the CCR report, everyone knows it's got
[35:19]
to be out by July 1st to our cons, our
[35:21]
customers. So that's another later
[35:24]
agenda item to go through. And then the
[35:28]
ethical behavior written pledge to the
[35:30]
trustees and employees. Um we're
[35:33]
anticipating having that all signed by
[35:34]
the end of this month.
[35:36]
>> Yes, we presented we presented it to
[35:38]
them at the last safety meeting. They'll
[35:40]
sign it at this coming safety meeting.
[35:41]
>> Great. And then the last one on the
[35:44]
second page is the grandma training the
[35:46]
requirement annual that I completed uh
[35:50]
for 2026.
[35:54]
And let's see, oh we're working on a
[35:58]
freight study with um bone columns, but
[36:02]
nothing's come up of that yet.
[36:05]
That's the compliance report. If you'd
[36:07]
like, I can go on to the financial
[36:09]
report unless you have any questions on
[36:11]
the I thought it looked really good.
[36:13]
>> Okay, we do show a loss right now, but
[36:16]
almost every year at this time, we do
[36:18]
show a loss.
[36:18]
>> That's what I was just going to say.
[36:20]
>> At this time of year, we always show
[36:21]
that loss.
[36:22]
>> And we do and honestly, our budget shows
[36:26]
a loss pretty much through the whole
[36:29]
entire year until tax money comes in,
[36:31]
>> right?
[36:32]
>> So, it just that's shows just what
[36:35]
happens is if we didn't collect taxes,
[36:38]
we would be at a in a deficit,
[36:41]
>> right? So it helps support our on&m m
[36:43]
and pays our bond payments. So
[36:45]
>> well you know what like I said I like
[36:47]
this layout because you could understand
[36:49]
it and you know and read it a lot better
[36:52]
easier. Yeah.
[36:54]
>> Shows you where we're under budget or
[36:56]
over budget.
[36:57]
>> Right now the revenues are under budget
[37:00]
and the expenses are under budget too.
[37:03]
So that's good. If you'd like, I can go
[37:06]
through some more. But um
[37:07]
>> Jeff, you have anything you're concerned
[37:10]
best I've seen.
[37:11]
>> That's what I said. I like this layout.
[37:13]
I'm trying to get the city to kind of
[37:15]
>> do this kind of stuff.
[37:17]
>> Yeah. Great. Good. Um there are
[37:19]
restricted funds
[37:21]
as we all know, we've spent we're
[37:23]
spending them on some projects. So the
[37:25]
total of uh funds have gone down. And
[37:30]
then in the later page,
[37:31]
>> tell me that because I that's where I
[37:33]
get really nervous.
[37:34]
>> You and I both. But we're okay.
[37:37]
>> We're okay.
[37:38]
>> We don't have to sell that land yet,
[37:40]
right?
[37:42]
>> Soon as you can. No, Trevor says.
[37:46]
>> As soon as you can.
[37:48]
>> So restricted fund balance, we have 12
[37:51]
million and unrestricted, we have 12
[37:53]
million.
[37:55]
And then the rest of the pages are line
[37:58]
by line, detail by detail. But you can
[38:00]
see on the first page of the detail, our
[38:03]
water sales are at 104%. So the sales
[38:05]
really aren't
[38:08]
low. We're not under budget, just on
[38:10]
strictly water sales. It's the other
[38:12]
revenue sections that pulls us down
[38:15]
under. And
[38:16]
>> how about our impact fees? I noticed
[38:18]
because we were talking about that the
[38:19]
other night with the city, how the
[38:21]
impact fees have kind of um
[38:24]
slowed way down. Yeah.
[38:27]
>> Yeah. We definitely show that same
[38:28]
thing. Um,
[38:30]
>> don't we have new impact fees? It'll
[38:31]
take place on June 1st.
[38:33]
>> May 19th is when they go into May,
[38:36]
>> right?
[38:37]
>> Yeah. 19th.
[38:38]
>> It was 90 days on the 19th. Yeah.
[38:40]
>> But that means when we don't have impact
[38:42]
fees, that means they're not building.
[38:44]
So,
[38:44]
>> that's right. Yeah.
[38:45]
>> It's a plus.
[38:46]
>> Mahogany should have quite a few coming,
[38:48]
>> which is a good thing.
[38:49]
>> Mahogany's paid for phase one and two.
[38:52]
the other phases haven't. So,
[38:54]
>> so how many phases over there? Four.
[38:56]
>> There's four that we've approved so far.
[39:00]
We're looking at five right now, and
[39:02]
they'll probably be a six and a seven.
[39:06]
So, that's that's good for impact fee
[39:08]
wise.
[39:12]
» Okay.
[39:15]
>> So, I mean, overall compared to budget,
[39:17]
we're in a good position.
[39:19]
>> That's good.
[39:20]
>> Great. Thank you. Thanks.
[39:22]
>> Thank you.
[39:23]
>> Okay, Andrew, your report.
[39:26]
>> Thank you, board chair. Uh,
[39:28]
first thing I want to draw your
[39:30]
attention to is that we are fully
[39:32]
staffed.
[39:35]
Um, as you know, that's
[39:38]
pretty impressive throughout all of the
[39:40]
industry right now to be fully staffed.
[39:42]
We're pretty excited about that.
[39:44]
um just speaks to how well the managers
[39:46]
are doing at managing the crew and the
[39:49]
morale and as well as what we offer
[39:52]
here. Um then we go into training. We
[39:55]
talked a little bit about the traffic
[39:56]
control tech that Ed did and Jean's uh
[40:00]
qualified water efficient landscaper. We
[40:02]
did hold a manager league team building.
[40:05]
uh Trevor and the engineering group uh
[40:08]
led a training where we're where we're
[40:11]
all able to participate in uh
[40:14]
communication
[40:16]
uh activity. Uh and then we also had an
[40:19]
on-site fire extinguisher training from
[40:21]
Unified. I've got a couple pictures down
[40:23]
below that.
[40:24]
>> I don't think Le's supposed to be able
[40:25]
to touch a extinguisher.
[40:28]
>> I didn't look. See
[40:29]
>> there? There's Lis. She pulled the pin
[40:31]
and she let her have it.
[40:32]
>> Yeah, that's good. Um, everybody was
[40:35]
able to get their hands on a fire
[40:36]
extinguisher.
[40:38]
>> A lot of people
[40:39]
>> The first one I tried was not It was
[40:41]
almost gone. So, it's like And then the
[40:44]
second one, man,
[40:47]
>> it was full.
[40:49]
>> It's always one of the the operators
[40:51]
favorite one to do to be able to go out
[40:53]
there and get their hands on an
[40:55]
experience,
[40:55]
>> take their anger out on it. Right.
[40:57]
>> So, that was a good training.
[40:59]
>> Unified did a good job presenting. So,
[41:02]
we're excited to have them and partner
[41:03]
with them.
[41:04]
>> So, did you will you write them a letter
[41:05]
thanking them?
[41:06]
>> Yes,
[41:06]
>> please.
[41:07]
>> We'll do that.
[41:09]
Um, the on-site cyber security training
[41:14]
was scheduled for May 27th. We're having
[41:15]
to push that. Justin Bagos uh had a
[41:20]
conflict. So, we'll do that in July. Um,
[41:23]
we are doing arbinger training with our
[41:24]
three new employees on June 2nd and 3rd.
[41:27]
I'll be treating that training. Um, and
[41:31]
then we're getting a handful of
[41:32]
employees to uh trench and excavation
[41:35]
safety training on June 3rd. And then we
[41:39]
have a company our a company coming in
[41:41]
doing on-site confined space training
[41:43]
with our and showing us some tripods and
[41:48]
uh going through our gas monitor on June
[41:50]
24th. Uh this month we're focusing on
[41:54]
driving safety. Uh we've been covering
[41:57]
things like uh
[42:00]
speed and what to watch for in each of
[42:03]
the morning meetings. Um no conferences
[42:06]
currently planned. Succession planning
[42:08]
has been completed. We were able to meet
[42:10]
with uh people and have 66 discussions
[42:13]
on uh what the possibilities are for
[42:16]
people that are wanting to move forward.
[42:18]
I think the most exciting thing is is to
[42:20]
see from the last time we did these
[42:24]
meetings to this time that people are
[42:27]
grasping hold of, hey, let's plan ahead
[42:29]
and let's look to our future. Anything
[42:31]
from you guys on the secession planning
[42:34]
that we did with you? We had a few come
[42:36]
in and talk about the inspector position
[42:38]
and a lot of the younger generation were
[42:41]
pretty, you know, active in their
[42:43]
questions and
[42:45]
>> seemed motivated to kind of take the
[42:47]
advice that they were given through
[42:49]
that. So, it was exciting.
[42:51]
>> That's what I've noticed is um they're
[42:55]
listening now.
[42:57]
>> I mean, they're listening to what it
[42:58]
would take.
[42:59]
>> Yeah.
[43:00]
>> They're they're taking that from them.
[43:02]
>> Yeah. So, we'll be better prepared in
[43:04]
the future. So, it's exciting. And, uh,
[43:08]
the last thing that I wanted to bring up
[43:10]
is that that's not on here is a couple
[43:12]
things that I've been working on. Uh,
[43:15]
one is I'm starting to look into the
[43:18]
vehicle evaluation um to see where we're
[43:21]
at with with our fleet. And so, I'll
[43:24]
have a report next month on that. And
[43:27]
then the other thing is is with the
[43:31]
union contract expiring next year, um
[43:35]
we're starting to evaluate what some of
[43:37]
the questions are that that people have
[43:39]
come up with so that we're prepared for
[43:41]
that that discussion when it comes up.
[43:43]
Some of the things that we're looking
[43:45]
into currently is where we are with
[43:48]
maternity leave and things like that if
[43:51]
we're matching up with the other
[43:53]
districts and and there's other
[43:56]
interests that that that employees have
[43:58]
brought up is the sick leave. And so
[44:00]
we're we're benchmarking ourselves on
[44:03]
that as well so that we're ready for
[44:04]
that discussion if it does come up in
[44:06]
into the negotiations.
[44:08]
>> Um that's it for me unless further
[44:11]
questions. So, um, just a heads up, what
[44:13]
about the Fourth of July parade?
[44:15]
>> Um, I'm I'm entering into that. We're
[44:18]
going to use the, uh, camera van. Dallas
[44:21]
is going to have it all prepared and
[44:23]
we'll have a couple employees and a
[44:24]
manager there for that event.
[44:26]
>> And then also, just to give the water
[44:29]
company a heads up, um, I do have, uh,
[44:34]
traffic control out radar in all around
[44:36]
the city. So, okay,
[44:38]
>> just to give you guys a heads up on
[44:40]
that.
[44:41]
Um, so
[44:44]
>> yeah, I've been noticing that quite a
[44:46]
bit.
[44:46]
>> Yeah, we've I got them out
[44:48]
>> trying to reduce the speed.
[44:50]
>> We reduce we reduce the speed on 8,000
[44:53]
from 40 to 35 and
[44:55]
>> Okay.
[44:56]
>> people that we wrote quite a few tickets
[44:58]
over on there and I know that's one of
[44:59]
our main roads we travel. So
[45:01]
>> pretty.
[45:02]
>> Yeah. So they're just
[45:04]
>> I was wondering if that change was
[45:05]
recent.
[45:06]
>> Yeah.
[45:07]
>> That's cool. I think I think that that's
[45:10]
uh definitely needed. So,
[45:13]
>> appreciate the city looking into that.
[45:14]
>> Yep. I just want to make sure, you know,
[45:16]
I want to give you guys all a heads up
[45:17]
and
[45:20]
>> so you can't say I didn't know that.
[45:21]
Yes. Do
[45:23]
>> they make the employees pay if they get
[45:25]
a speeding ticket? It's it's not
[45:27]
>> the taxpayers pay it.
[45:29]
>> Uhuh.
[45:30]
>> No, I just The employee the employee
[45:32]
would pay the ticket.
[45:33]
>> Yeah. It's not the water company.
[45:35]
>> No employee. No. No. That's on their
[45:37]
driving record.
[45:39]
>> Yes.
[45:39]
>> Hey, give me that look again.
[45:43]
>> Fortunately, we haven't had any speeding
[45:47]
tickets
[45:48]
>> since I've been here.
[45:51]
>> Okay. Um, again, I want to take a second
[45:54]
really fast. I want to thank all you
[45:56]
guys. Like I said, I was laying in bed
[45:58]
the other night just thinking my career
[46:00]
here for going on 17 years from where I
[46:03]
started to where we're at now. It's like
[46:05]
night and day. And I hear all the time
[46:07]
how how everybody says Magnum Water is
[46:11]
so wellrun and I heard that last night
[46:13]
through Jordan Valley Water. So that's
[46:15]
pretty impressive.
[46:16]
>> Yeah.
[46:17]
>> So again, I want to thank you guys for
[46:20]
how hard you guys work and how you work
[46:22]
together.
[46:22]
>> I don't think the community understands
[46:24]
the grants that you guys get. There's a
[46:26]
lot of footwork there and that does save
[46:28]
a lot of money.
[46:29]
>> Thank you. that that 4 million we got in
[46:31]
that reuse, that was a real that's been
[46:35]
real neat.
[46:38]
>> Yeah, you do a great job all of you.
[46:40]
>> Appreciate that feedback, whole team.
[46:42]
>> Thank you.
[46:44]
>> It's nice to hear cuz we get a lot of
[46:48]
not nice customers.
[46:49]
>> Oh god.
[46:51]
>> Well, we appreciate your feedback. Well,
[46:54]
I do and like I said, I mean, like I
[46:56]
said, we're we're all the trustees are
[46:58]
really couldn't be more impressed.
[47:01]
>> Thank you.
[47:02]
>> So, okay, let's move on to our water and
[47:05]
sewer availability discussion. Trevor.
[47:08]
>> Okay. Thank you, chair and board. What
[47:10]
we have here is called Box Wheel
[47:12]
Maintenance Shop. Um,
[47:15]
I will
[47:17]
I don't have the GIS pulled up, but
[47:20]
hopefully we can kind of orient
[47:22]
ourselves here. So, we have uh the SR201
[47:27]
and then there's the South Frontage Road
[47:29]
and you all know the Godfrey building
[47:32]
along there,
[47:33]
>> right?
[47:33]
>> This is just to the east of the Godfrey
[47:35]
building. Um the parcel sits back from
[47:40]
the frontage road to the south
[47:45]
um right here. And they're just planning
[47:47]
a just a smaller commercial building um
[47:50]
shop building.
[47:52]
And for water and sewer, you can see
[47:56]
we've got water along the frontage at
[47:58]
the south frontage road, but there's
[48:00]
also um water that comes down this
[48:04]
frontage road. Well, they're calling it
[48:06]
South Frontage Road here, but that's a
[48:07]
private line uh or private road to the
[48:10]
Godfree properties, but we have
[48:13]
easements for our water and sewer that
[48:15]
are in there. So, the recommendation is
[48:18]
to connect to those um each of those in
[48:21]
that road and bring them into the
[48:23]
property. We've run the fire flow and um
[48:27]
their water demand and everything there
[48:29]
looks good. We make the recommendation
[48:32]
of approving water. What will they have
[48:34]
on there? Just a building with bathrooms
[48:37]
in or
[48:38]
>> Yep. pretty simple.
[48:39]
>> Because they won't use any other water.
[48:41]
>> Yeah, the building does have a fire line
[48:43]
planned. Um, but other than that, the
[48:46]
it's just water and sewer for basically
[48:49]
restrooms, little shop water.
[48:53]
>> So, Mr. Mr. Chairman, I'd like to make a
[48:55]
motion to approve the uh Box Wheel
[48:59]
maintenance shop located 6123 West, 2100
[49:03]
South for water and sewer connection.
[49:06]
>> I'll second that.
[49:07]
>> In motion, second. All in favor?
[49:09]
>> I
[49:10]
>> Thank you.
[49:11]
>> Okay, moving on. Project award and
[49:12]
agreement. Discussion possibly motion to
[49:15]
approve the following projects awarded
[49:19]
» and agreement. So, Dallas.
[49:21]
>> Yes, sir. Mr. Chairman, what we've have
[49:23]
from Twin D is the quote to do our
[49:26]
annual collection system rehab project.
[49:29]
Um, it's something that we'll work on
[49:30]
all summer. It's about 2700 ft roughly
[49:34]
of slip lines. Some are manhole to
[49:36]
manhole, some are just point and spot
[49:38]
repairs. Um, we just target these
[49:41]
maintenance projects based on severity
[49:42]
of degradation. So, we're starting this
[49:45]
a little earlier than we do in the past.
[49:48]
We're just trying to avoid some early
[49:50]
fall weather that could potentially
[49:52]
impact some of these traffic control
[49:54]
centers. Um, but you can see the total
[49:57]
quote is around 260K. I try to put in an
[50:01]
additional 15,000 in case they get into
[50:04]
there and find something that needs to
[50:06]
be repaired. We don't have to do any
[50:08]
type of change to the quote. Um, so I
[50:10]
just give them a do not exceed price.
[50:12]
And like I said, we'll just be working
[50:14]
on this all summer.
[50:16]
Now, does that keep infiltration from
[50:18]
coming in also or just
[50:20]
>> It will. If there's any areas that have
[50:22]
infiltration, this will keep it locked
[50:24]
out.
[50:24]
>> So, is the pipe we're slipping, is it
[50:26]
all concrete and spigot?
[50:28]
>> Some of them are tile and some of them
[50:30]
are concrete.
[50:31]
>> Is the tile eroding away?
[50:33]
>> Um, it's just more prone to cracks
[50:37]
>> and then and then the cracks get roots.
[50:40]
So,
[50:40]
>> that's just to say we have to fight the
[50:42]
roots coming in,
[50:43]
>> right?
[50:46]
So,
[50:46]
>> okay, Mr. Chairman, like to make a
[50:49]
motion to approve the 2026 manhole to
[50:54]
manhole slip line and spot repair
[50:56]
project with Twin D construction for the
[50:59]
amount of not to exceed 275,000.
[51:02]
I'll
[51:03]
>> second that.
[51:04]
>> Be a motion. Second. All in favor?
[51:05]
>> Have we used Twin D before?
[51:07]
>> We have.
[51:08]
>> Okay.
[51:08]
>> So, question I have. So, you know, we're
[51:10]
looking at 260 and like you said, you
[51:12]
went 15,000 over. So if they don't where
[51:14]
does that where does that money go Leo
[51:16]
if we if we don't use the you know we
[51:19]
budget for 275 and right here it says
[51:22]
260.
[51:23]
>> Well it's not like we take if say it
[51:25]
goes down to 260 we don't take 15,000
[51:29]
somewhere. It just stays within the
[51:30]
operating budget but if there's a a
[51:33]
budget item that maybe goes over by the
[51:37]
15 that just kind of washes each other
[51:40]
out.
[51:41]
>> Okay. Awesome. Thank you. That makes
[51:42]
sense.
[51:43]
>> Yep.
[51:44]
>> Okay. Let's move on. Administration and
[51:46]
discussion. Possibly motion to approve
[51:47]
the following administration items.
[51:49]
Steve.
[51:50]
>> All right. Um, thank you. Yeah. So, this
[51:52]
is just our annual CCR report that we
[51:55]
work with Joel together on.
[51:58]
Um,
[52:00]
this is due like Leis said, we have to
[52:02]
have it out to the customers by July 1st
[52:05]
and then we have 10 days after we get it
[52:06]
to the customer to submit it to the
[52:08]
state. So, um, when at the time that the
[52:14]
I was putting the board packet together,
[52:16]
we hadn't quite finished it. So, the
[52:18]
only changes made to the final are the
[52:21]
dates on the THMS and the HAAS and then
[52:24]
the lead and copper. Both of those got
[52:27]
changed to 2025.
[52:28]
>> Yeah, I seen that.
[52:29]
>> But other than that, everything else is
[52:31]
the same. So,
[52:32]
>> looks good. Now, is any of this
[52:34]
available to the public
[52:36]
>> right now?
[52:37]
>> No. Once once we submit it.
[52:39]
>> Yes.
[52:40]
So it goes to everybody.
[52:41]
>> It goes to everybody gets a copy of it.
[52:43]
>> It'll be a link will be on the physical
[52:47]
bill and then a link will also be on our
[52:51]
website that goes straight to the CCR.
[52:54]
Um
[52:56]
and then anybody that requests comes in
[52:59]
whatever can get a paper copy.
[53:02]
So
[53:03]
>> awesome. Looks pretty good. Look. I
[53:05]
think it looks awesome.
[53:06]
>> We do add Jordan Valley's water quality
[53:09]
data to ours.
[53:11]
>> Yeah,
[53:11]
>> also when we send it.
[53:13]
>> That's also in there. But
[53:15]
>> is Jordan Valley in there now? I didn't
[53:17]
notice.
[53:17]
>> What's that?
[53:18]
>> Jordan Valley isn't in there now, is it?
[53:20]
It's not
[53:21]
>> Oh, yeah. On that new one. Yeah.
[53:22]
>> Yeah.
[53:23]
>> But on the one we send in, it will be
[53:28]
» okay. Does someone want to approve it?
[53:30]
>> Sure. Mr. Mo Mr. Mr. Chairman, I'd like
[53:33]
to make a motion to approve the 2025
[53:36]
consumer confidence report.
[53:38]
>> I'll second that.
[53:39]
>> And a motion second. All in favor?
[53:40]
>> I.
[53:41]
>> Okay. Dallas.
[53:43]
>> Yes, sir. Mr. Chairman, this is just the
[53:46]
municipal wastewater planning program
[53:48]
survey. Um, it's an annual thing that me
[53:50]
and Trevor and Leo work on each year. It
[53:53]
does require a board motion. um just
[53:56]
surveys, you know, age of our equipment,
[53:59]
projects we're working on, population of
[54:02]
the town. Um and then we submit it
[54:05]
annually around this time.
[54:08]
It's it's a survey that the board has
[54:10]
seen before. Not a lot changes. Um
[54:13]
>> the format looks different. Usually it's
[54:15]
a print screen.
[54:17]
>> Yeah, it's tough.
[54:18]
>> This year they gave us a report to fill
[54:20]
out like this, so that was good.
[54:26]
I think I like this better. It's way
[54:28]
better.
[54:29]
>> That's what I was going to say. I like
[54:30]
this.
[54:33]
>> A lot faster to fill out.
[54:34]
>> Yeah, it is.
[54:41]
» Any questions?
[54:42]
>> Good.
[54:43]
>> Okay. Well, we want to uh approve this.
[54:47]
>> Okay. So, Mr. Chairman, I'd like to make
[54:50]
a motion to uh approve the 2026
[54:54]
municipal wastewater planning program
[54:57]
report.
[54:58]
>> I'll second that.
[54:59]
>> Motion second. All in favor?
[55:00]
>> I I
[55:01]
>> Hey, just a heads up, you guys. Um I
[55:04]
don't know how much copper we've got
[55:05]
laying around, but over at Jordan
[55:07]
Valley, we've they've been getting we've
[55:09]
been they've been getting hit quite a
[55:10]
bit for theft.
[55:12]
>> Oh, wow.
[55:12]
>> And it's actually in their new building
[55:13]
they bought in West Valley City off
[55:15]
Redwood Road by the Redwood Drive-In. So
[55:18]
they put some uh what's them cameras
[55:21]
called the light for hunting?
[55:24]
>> Motel cameras out.
[55:26]
>> And it's funny is the second time they
[55:29]
caught the guys and they arrest them.
[55:31]
The guys came back again.
[55:32]
>> Same guys.
[55:34]
>> You're kidding.
[55:34]
>> Have we had any theft? We haven't had
[55:36]
any.
[55:38]
>> We're pretty secure on
[55:39]
>> um and we really don't use a whole lot
[55:41]
of copper anymore. Once in a while we
[55:43]
do, but we don't keep much on hand.
[55:45]
>> Okay. I just want to make sure that we
[55:48]
kind of keep an eye on that cuz it's
[55:50]
getting crazy again. We've had that down
[55:53]
at the ballpark and
[55:56]
>> Okay, Andrew discussion for um for
[56:01]
season for operating season uh working
[56:04]
schedule change.
[56:06]
>> Yeah. So, if you'll just remember, board
[56:08]
had uh the idea that maybe we help the
[56:11]
operators out through the summer by
[56:13]
getting in earlier, getting them out of
[56:15]
the heat uh as a safety concern. Um so,
[56:19]
we just wanted to bring this back to the
[56:21]
board and just make sure that we're all
[56:24]
still on the same page. We're
[56:26]
anticipating starting this summer
[56:28]
schedule for the operators, Steve,
[56:30]
Dallas, and myself on June 1st through
[56:33]
August 13th. the and the on call
[56:37]
operator that week would still continue
[56:39]
to work the normal schedule of 7 to 5:30
[56:42]
so that we have coverage for that last
[56:45]
hour of work.
[56:47]
>> And what about our front office? Would
[56:49]
they work?
[56:49]
>> They're going to continue the front
[56:51]
office and their managers and Trevor and
[56:54]
Clint Dilly would continue with the name
[56:57]
same 7 to 5:30 schedule.
[57:00]
>> Okay. So, you know, I I'm the one, you
[57:04]
know, I'm the one that brought this up
[57:05]
about wanting to do this. The only
[57:07]
question I have and I I just want to
[57:08]
make sure I I can support this again,
[57:11]
but that, you know, I don't want to sit
[57:13]
and see our operators hanging out till
[57:15]
7:00 in the morning and and uh and then
[57:19]
decide to get out on the streets. And if
[57:21]
that's going to happen, I we'll just go
[57:22]
back to the regular schedule. And I
[57:24]
think we had that discussion last year.
[57:27]
>> Uh we need to we need to get moving. We
[57:29]
need to get here, get going.
[57:31]
And it is it's getting way light.
[57:34]
>> But I I just I just don't want to see us
[57:37]
lolly gagging around going down to the
[57:39]
gas station, going to the doughnut shop.
[57:41]
>> Yep.
[57:42]
>> And uh and and you know, I mean, because
[57:45]
at the end of the day, we're all paid,
[57:46]
including myself. We're all paid by
[57:48]
taxpayers and we all need to look at
[57:50]
that.
[57:51]
>> I was hoping at six now.
[57:53]
>> Yeah.
[57:54]
No, I'm in agreement and I think the
[57:55]
managers are all in agreement with that they'll get there and they'll get
[57:59]
out on the roads as quickly as possible
[58:01]
>> because I think this is a morale deal to
[58:04]
form two, but in return with the board
[58:06]
doing this for the them, they got to
[58:08]
give back, too. And and and I'm going to
[58:10]
be honest with you, if I have any
[58:13]
complaint from the public, we'll just go
[58:15]
back to the 7 to 5:30.
[58:18]
>> I think we're in agreement
[58:19]
>> and I I'm sure the board all agrees.
[58:22]
>> Yeah. But I um you know with the office
[58:26]
I mean if you think that schedule you
[58:29]
know 7:00 to 5:30 I thought I thought we
[58:32]
went
[58:34]
>> with them I thought we went from 6:30 to
[58:37]
5. No never was okay.
[58:39]
>> Uhuh. We didn't change and then the on
[58:41]
call person would stay that extra hour.
[58:43]
Okay.
[58:43]
>> Or it would just shift to the
[58:45]
>> Okay. Cool.
[58:46]
>> Worked out.
[58:47]
>> I'm totally in support as long as I said
[58:49]
as long as we don't have any feedback
[58:51]
from the community. Okay, great. Thank
[58:53]
you. Appreciate your guys' support on
[58:55]
that.
[58:55]
>> Our next board meeting will be June 11th
[58:59]
at 10 o'clock, 2026 here.
[59:04]
Um, I don't think I'll second it.
[59:07]
>> Okay.
[59:10]
It's been motioned second. All in favor?
[59:13]
>> I had a conflict. That's why I called
[59:16]
Clint. I called you on
[59:18]
>> because you're going to be gone. Well,
[59:20]
the the 9th of July, I'm trying to ask
[59:23]
if we can move it to the 16th in July.
[59:29]
» I don't care.
[59:30]
>> We can look at that. Um,
[59:34]
>> I'm just trying to do it ahead of time.
[59:36]
So, I've got the only big enough truck
[59:38]
to haul the all their food and
[59:41]
everything.
[59:41]
>> And if you you know what, I don't have a
[59:42]
problem if you if you have to miss the
[59:44]
meeting. Me and Danny can take care of
[59:46]
it.
[59:47]
>> I don't want to miss it. I know, but I I
[59:49]
know you don't, but I'm just saying
[59:52]
>> you do get a break, too, don't you?
[59:54]
>> I don't need This is fun.
[59:57]
>> Yeah, we can we can move it. Don't
[59:59]
worry.
[59:59]
>> If we can move it, that's great.
[1:00:01]
>> Um, just a thought or a reminder, I
[1:00:03]
guess. June's usually our certified tax
[1:00:06]
rate bump.
[1:00:07]
>> Yes.
[1:00:08]
>> And sometimes we don't have this
[1:00:11]
certified rate. They're supposed to It's
[1:00:13]
supposed to be out on the 8th. So hoping
[1:00:15]
it's done and ready by the 11th, but if
[1:00:18]
we don't, we might have to have a
[1:00:20]
>> that's
[1:00:21]
>> special meeting in June, maybe.
[1:00:23]
>> So that might be like the 15th or
[1:00:25]
something.
[1:00:25]
>> Uh we have to have all of our paperwork
[1:00:28]
into the counties or the state by the 20
[1:00:32]
or 22nd. So it's got to be around then
[1:00:35]
if it's going to be
[1:00:36]
>> you'll just give us a little Okay,
[1:00:39]
>> I'll contact you. But
[1:00:41]
>> they always cut it right to the limit.
[1:00:43]
>> That's confusing.
[1:00:45]
remember a few times it comes in during
[1:00:47]
the board meeting.
[1:00:48]
>> If you do have to have a special
[1:00:49]
meeting, the law has changed and so you
[1:00:51]
could do that completely electronically
[1:00:53]
now if that would be easier and save the time and money of doing this
[1:00:57]
physically because I imagine if we had
[1:00:58]
to do a special meeting it would be like
[1:01:00]
five minutes.
[1:01:01]
>> Yeah,
[1:01:01]
>> that wouldn't be a big thing.
[1:01:04]
>> Okay,
[1:01:04]
>> that would be do electronic. Okay, just
[1:01:07]
let us know whatever.
[1:01:08]
>> So, are we in need? We're not in need of
[1:01:11]
a closed door meeting today. Am I right?
[1:01:13]
No.
[1:01:14]
>> Okay. So, we're going to
[1:01:16]
uh Does
[1:01:19]
We don't have that. Um
[1:01:20]
>> We're good.
[1:01:23]
>> Yeah, we're good without a post.
[1:01:25]
>> Okay. Does uh someone want Okay. So, do
[1:01:29]
we
[1:01:30]
>> So, does anybody have any any stuff that
[1:01:33]
they would like to bring up? Hey, sir. I
[1:01:36]
noticed you're you've came into the
[1:01:38]
meeting and we're really close to being
[1:01:40]
done. Is there anything that you want to
[1:01:41]
address to us? I'll talk to
[1:01:44]
>> Okay, awesome.
[1:01:46]
>> Great.
[1:01:48]
>> Nope. I just want to make sure. I didn't
[1:01:49]
want to
[1:01:50]
>> Thank you.
[1:01:50]
>> No problem.
[1:01:52]
>> So, does the does the
[1:01:54]
I was going to say council. Does the
[1:01:56]
board have anything that they want to
[1:01:59]
address um or anything? Nathan, do you
[1:02:02]
have anything you want to address?
[1:02:04]
>> No, but I I would like to chat with you
[1:02:06]
and Trevor really quickly afterwards
[1:02:08]
about
[1:02:08]
>> Okay. Absolutely.
[1:02:09]
>> Okay. So I I'd like to make a motion to
[1:02:12]
adjourn.
[1:02:14]
>> I'll second that.
[1:02:15]
>> Motion second. All in favor?
[1:02:18]
>> I 11:02.
[1:02:19]
>> I think this is a record for us
[1:02:20]
>> at 11.
[1:02:21]
>> Yeah. Approach.