[0:01]
Okay, Google says it's four o'clock. Let's call our meeting order.
[0:04]
Can you take the roll, please?
[0:06]
Certainly. Mr. White?
[0:07]
Here.
[0:07]
Mr. Miller?
[0:08]
Here.
[0:09]
Mr. O'Reilly?
[0:10]
Here.
[0:10]
Mr. Eberle?
[0:11]
Here.
[0:11]
Mr. Knecht?
[0:12]
Here.
[0:13]
Mr. Varshall?
[0:13]
Here.
[0:15]
Mr. Capulis here, as well as trail manager, comp, and utility staff.
[0:18]
Thank you, Bob.
[0:20]
Jessica, was the meeting appropriately noticed?
[0:22]
Yes, we spent on a notification from various media
[0:25]
outlets and just posted here at the library city hall
[0:29]
as well as the city website.
[0:31]
Thank you very much.
[0:34]
Number three, public comment period. At this time
[0:36]
the commission recognized members of the public and
[0:38]
dedicated the desire to address the commission. Do we have any members of the
[0:42]
public here today to address the commission?
[0:46]
Any members of the public for public comment?
[0:50]
Seeing none.
[0:52]
Number four, commissioner and staff comments.
[0:54]
Commissioner, is there anything before we get going?
[0:57]
I would just want to welcome John to the commission.
[1:03]
Thank you, John. Did you want to tell anybody about yourself?
[1:05]
Well, just recently appointed to the common council
[1:09]
in two meetings, two and a half, three meetings now.
[1:13]
And, yeah, I work as an IT director at Ford Bank. Prior
[1:17]
to that, I worked in healthcare for far too many years.
[1:21]
Almost 30. I aged myself a little bit by saying that.
[1:25]
I'm happy to be here. I know I have a lot to learn, but I'm ready to dig in.
[1:30]
Good. Welcome.
[1:32]
Staff comments tonight.
[1:34]
Yes, I have two of them tonight.
[1:36]
So first, Jessica will be sending out an email.
[1:39]
Probably tomorrow. The blue human annual
[1:41]
meeting is scheduled for October, October 20th.
[1:45]
It will be held on the cross. It's from 9 a.m. to 4 p.m.
[1:48]
So that's bringing together two joint-act agencies.
[1:50]
About 29 different utilities are represented. Both bodies will have board meetings,
[1:55]
but then we'll have, right now, we have four or five speakers lined up to give
[1:59]
insight into the industry on the electric side.
[2:03]
From generation type batteries and the end-of-meter diesel generators to someone
[2:08]
talking about banking security and then someone giving
[2:11]
maybe an overview of the state of the electric market.
[2:14]
So look for that email and if you can respond to her to let her know if you're
[2:17]
available to attend, that would be great.
[2:20]
Especially for newer members, these are great educational opportunities.
[2:25]
Yeah, and this will bring together, like I said, 29 communities, but
[2:28]
representatives will be, you know, my level or department of public works
[2:34]
directors, utility directors, council members, commissioners, mayors.
[2:38]
It will be the whole gamut of people that may attend
[2:40]
these events. So we're more than welcome to join us.
[2:44]
The second item I have is, I'm sure many of you have heard in the news about a
[2:47]
local company that's going to be closing later this year.
[2:51]
Unfortunately, this company, you know, it represents about half a percent of our
[2:55]
electric sales. So if I exclude purchase power, it's about a half a percent.
[2:59]
So it's meaningful, but not maybe too large, if you will. On the water side, it
[3:06]
represents closer to about 7.5 percent of our water sales.
[3:09]
So unfortunately on the water side, while there would be that reduction revenue,
[3:14]
there isn't really a corresponding expense, per se.
[3:17]
There may be some slight, you know, decrease in electric electricity that we use
[3:21]
for pumping and a little bit from a chemical perspective as far as treatment.
[3:24]
So we're already taking this into account as we consider the budgets as we prepare
[3:29]
those for your consideration in the months that come.
[3:31]
And another thing to think about is this may, unfortunately, lead us, as you know,
[3:35]
on the water side, we have the ability to do a simplified water rate case.
[3:37]
And that would be something that would be looked at in March or April next year. So
[3:41]
it's possible with a combination of looking at the budgets and the audit and so
[3:45]
forth that we may have to strongly consider that when the time comes.
[3:48]
So just kind of putting that out there for information on me.
[3:52]
That's great. And that's both of them?
[3:55]
Yes.
[3:57]
Thank you.
[3:58]
Number five, Employee Service Awards.
[4:00]
Yes. So today we get to recognize Jessica Lure. She's celebrating five years of
[4:05]
service on September 27th. It's hard to imagine that five years have gone past.
[4:11]
It's gone pretty fast. So she is our communications and executive assistant that
[4:15]
whole time. So please join me in congratulating Jessica.
[4:19]
Thank you.
[4:25]
Thank you.
[4:26]
Number six, a glue update.
[4:28]
Yes. So each quarter we provide an update on Great Lakes Utilities activities.
[4:33]
It's kind of a recap of a lot of the
[4:35]
activities that are going on from across the quarter.
[4:38]
So I won't necessarily get into any specifics
[4:41]
on it, but welcome any questions you may have.
[4:43]
I know it's a little bit of alphabet soup. And if you look at it with the different
[4:46]
acronyms, it's kind of a world I work in.
[4:49]
If you will, that would work in.
[4:52]
Yes, just a quick question. And maybe we've covered this. So I
[4:55]
apologize. But I see on the reference to the CMP as RFP. Yes.
[5:00]
You just give me two minutes on what that is.
[5:03]
Sure. So CM Compass is another joint agency in Minnesota.
[5:09]
And we partnered with glue partner with them along with Konexis, which is a
[5:13]
cooperative in northern Minnesota, northern
[5:17]
suburbs of the St. Paul area, Minneapolis area.
[5:21]
Along with Cedar Falls, Iowa, the four groups
[5:24]
went in and put together an RFP for a power supply.
[5:27]
And we had basically any non-hydrogen. So renewables, wind,
[5:31]
solar, or batteries for different various quantities and sizes.
[5:36]
So we expect to see the results later this week. And then we'll be analyzing over
[5:40]
the next month or two to see if there's some
[5:41]
viable solutions to make glue power supply.
[5:44]
Thank you.
[5:46]
Good question.
[5:49]
Any other questions on the Google update?
[5:54]
That's for information only.
[5:57]
So moving on to number seven, public and private side water replacement timeline.
[6:02]
So this is a follow up to the lead service
[6:05]
replacement schedule that the commission adopted back in 2025.
[6:09]
At that time, we established deadlines for the end of this year for private side
[6:13]
lead services, water services, 2027 for the
[6:16]
public side lead services, and 2030 for lead gooseneks.
[6:20]
As we progress through the replacement program, we're
[6:23]
looking at recommending some adjustments to that timeline.
[6:27]
We currently have about 273 public side lead services and approximately 542 lead
[6:32]
gooseneks remaining, along with about 18 or so private lead services.
[6:38]
And unfortunately, as we continue to do the public side, one
[6:41]
thing that does occur is that we do identify new private side.
[6:44]
And the reason that happens is obviously it's their underground facilities. Over
[6:47]
time, people's lead services, they failed
[6:50]
inside the house or it comes up into the house.
[6:53]
So the private property owners replaced that maybe three or four or five feet. So
[6:57]
when we do a visual, it looks like it's been updated.
[6:59]
But in reality, when you go outside and look at the curb top, that's when you see
[7:02]
the rest of it's unfortunately still wet.
[7:04]
So we expect that, I think, John, was it one in 12, roughly? So for every 12 public
[7:10]
side, we come across one of them has a private side lead to be replaced, roughly.
[7:18]
So the recommendation is to allow newly identified, so what we're recommending is
[7:23]
that for any newly identified private lead services, that they basically have until
[7:28]
the following county year for replacement.
[7:30]
So that would mean if they found it now, they
[7:32]
would have until the end of next year to replace it.
[7:37]
And then to extend the public side at least one more year to the end of 2028 and to
[7:41]
extend the gooseneck deadline to the end of 2035.
[7:44]
These changes will give us greater flexibility to coordinate the work with streets
[7:48]
and other water main projects, better be able to
[7:51]
and better manage our available capital spending.
[7:55]
And as we just talked about that large customer, that's another component to be
[7:58]
thinking about is it, you know, as our resources are lessened, this would help.
[8:04]
Importantly to note is that even with these potential changes, we're still looking
[8:08]
at targeting a replacement of the public service, the public lead services nine
[8:14]
years ahead of the current federal and state requirements.
[8:18]
So I'd like to leave it to you guys for any questions you might have.
[8:22]
Is there a motion for anything?
[8:25]
I'll move to approve that.
[8:26]
Second.
[8:27]
I'll move to approve the recommendation.
[8:28]
Yes.
[8:30]
Second.
[8:30]
Second.
[8:31]
Questions?
[8:32]
Yeah, I don't have any problem with the high schedule.
[8:34]
I think that looks fine, but I'm just curious if there's been any talk from
[8:37]
regulators or environmental groups or others who might be concerned that the
[8:41]
schedule, the planned schedule is too long and pushing legislators and whatever to
[8:48]
advance the schedule or accelerate the schedule.
[8:51]
I think it's a little more seeing it's actually gaps.
[8:54]
So some of the big communities like Chicago and such have considerable amount of
[8:59]
what services and for them to even meet those deadlines, it's unlikely.
[9:04]
They should note that the EPA is in court right now with the AWBA and others
[9:10]
fighting against the schedules that have been proposed.
[9:14]
I'm not moving into the details, but they feel like it's unjust, if you will.
[9:18]
So it's been more the latter.
[9:21]
Not likely that anything will accelerate.
[9:25]
Yeah, I think the only thing we'll likely hope that I would anticipate at some
[9:28]
point we'll see a good snack deadline added to it.
[9:31]
But I think at this point that the main focus is on the full blood services.
[9:35]
And I should note that, you know, as we try to coordinate projects and I know you
[9:39]
haven't seen the capital budget yet, but one thing that we do have is, and this is
[9:42]
a ways out, and I alluded to Central Avenue.
[9:45]
Central Avenue from Arnold to Harrison is scheduled to be replaced in 2032.
[9:53]
And we have some blood services in that area.
[9:55]
So as we continue down the road, is it possible this item might come back to you
[9:59]
again for consideration if we want to make some adjustments?
[10:02]
But just I think this is a good interim to know.
[10:05]
At least a first step, I guess, to help get us some flexibility.
[10:08]
Yes, sir.
[10:11]
Just a new guy question.
[10:13]
On the private side funding, are those
[10:16]
homeowners responsible to pay that replacement?
[10:20]
And are there grants?
[10:22]
Yeah, so there are grants right now.
[10:25]
So through those that we complete this year are being 100% funded through the grant
[10:29]
program or some, the commission allocated a
[10:32]
few dollars from their fund to help support.
[10:35]
Unfortunately, I want to look forward to next year and beyond.
[10:38]
We're a little worried that the state funding may be trimmed.
[10:41]
So right now it's 100% principal forgiveness.
[10:44]
But we're anticipating is that we may see
[10:45]
something like 25% that's full forgiveness.
[10:48]
So obviously on a $5,000 expense, there's going to be 75% of that on the customer.
[10:54]
However, I think, are we talking, what's the carryover?
[10:56]
We're thinking like eight to 10, John.
[10:59]
Of the remaining projects?
[11:00]
For next year, yeah.
[11:01]
Yeah, we have eight to 10.
[11:02]
I'm still going to try to get them in this year yet.
[11:04]
Yeah.
[11:05]
But if we can't, we might put it off until April.
[11:07]
But yeah, there's with the money we got left, we can
[11:09]
probably do about eight to 10 of the 18 we have remaining.
[11:13]
So there'll probably be eight or so that carry over to next year.
[11:16]
If you figure we have about 250 or so to inspect on the public side, we're
[11:21]
anticipating maybe another 20 to get added.
[11:23]
So those are the ones, unfortunately, that'll
[11:25]
get subject to that 25% principal forgiveness.
[11:27]
And obviously when the time comes, when that funding comes back to you guys for
[11:32]
consideration on if there's any creative
[11:35]
solutions that'll come up with a shortfall.
[11:38]
Thank you.
[11:39]
So it starts with the homeowner is responsible for the private side.
[11:42]
Got it.
[11:44]
But the utility's got a great job of finding resources to help out.
[11:48]
Okay.
[11:50]
Okay, so we have a motion and a second.
[11:51]
Any other questions or discussion on that?
[11:55]
If not, all in favor?
[11:56]
Aye.
[11:57]
Opposed?
[11:59]
Motion carries.
[12:03]
Number eight, can you strategic plan quarterly update?
[12:07]
So just kind of like the glue, this is a
[12:09]
quarterly update that we provide to the commission.
[12:13]
This is there's obviously a number of activity that's the initiatives.
[12:18]
You can see that we cut it.
[12:19]
We tell the quarter living rent has been changes from the last time.
[12:22]
And then green are the ones that are different and something that's 100% complete.
[12:25]
So you can see that the vast majority of the initiatives have some activity going
[12:29]
on and changes from a month or just a quarter quarter.
[12:33]
So this will get into details of anyone but
[12:35]
welcome any questions or comments you might have.
[12:40]
Questions to have today.
[12:51]
Looks like good progress in a number of areas.
[12:53]
Is there anything that's lagging behind that you're concerned about?
[12:59]
I think that there's, you know, there's a couple that are related to the commission
[13:03]
on the back end related to our support of glue and potentially U-MEG.
[13:08]
I think there's also one on economic development because we kind of tabled that for
[13:12]
the city to get their strategic plan completed.
[13:14]
So those are areas that we're waiting on.
[13:15]
Maybe that needs some.
[13:18]
We need to do some things on the communication area.
[13:21]
I know this is focusing on that so we can
[13:24]
kind of move that on the floor a little bit.
[13:26]
I do envision that, you know, there's a 27 plan based on where we are now.
[13:30]
I could envision us asking for a one year extension if you would to run that one
[13:34]
more year just given the activity that's going on.
[13:37]
I don't think there's been a huge shift, I guess, overall in focus.
[13:40]
There's obviously more work that could be done
[13:42]
within the items that were already identified.
[13:46]
Other questions?
[13:48]
I'm just wondering, again, new guy question, how
[13:50]
often is this strategic plan edited, redeveloped?
[13:55]
Is it annually?
[13:57]
Yeah, the overall plan I think is on a three year cycle generally.
[14:00]
Three years? Okay.
[14:01]
But we have the last one I think we want one more year
[14:03]
and then this one I could see where we may go one more year.
[14:05]
Thanks.
[14:08]
Good.
[14:10]
We've got questions.
[14:13]
Okay.
[14:14]
We're going to have to talk.
[14:18]
All right, that's for information only.
[14:20]
Any other questions?
[14:23]
If not, number nine, economic development fund governance policy review.
[14:30]
Version 62.
[14:32]
Version 62.
[14:34]
So, so based on the discussion of the last meeting, we've put together a new or
[14:39]
replacement policy that was developed that basically split has the community
[14:45]
donations which was a part of the policy originally.
[14:48]
And then we added a section as it relates to economic development support support.
[14:52]
The hope was this, you know, the strap policy might
[14:55]
help facilitate some conversation and they may help us.
[14:58]
So there's ways to tweak it or make it to make it better.
[15:01]
But just again trying to help drive that forward a little bit.
[15:06]
I really like the way that you guys separated out the community and the economic
[15:11]
development criteria that was that was a big
[15:13]
part of what came out of last month's conversation.
[15:16]
I think you guys did a nice job on that.
[15:18]
Do we want to start with questions comments discussion.
[15:21]
Do we want to start with emotion.
[15:25]
What's the flavor today.
[15:31]
Move to approve for discussion.
[15:35]
Second by Paul discuss.
[15:41]
Yes, I'll just add that as I was looking over this this morning and remembering how
[15:45]
many times we've talked about this before.
[15:48]
We just need to get something down and proved and it's likely things will come up
[15:53]
that might turn us to want to change this but until we
[15:56]
have something adopted that covers what we've talked about.
[16:01]
We could spin our wheels a lot trying to get us to find to exactly the way we think
[16:06]
we want and then something will come up so I agree that
[16:09]
we should prove this version and see how far it takes us.
[16:14]
Okay.
[16:17]
Other thoughts.
[16:21]
This reads a whole lot better than the version 6061.
[16:27]
I would agree I think it's time to give it a try.
[16:31]
No further discussion with emotion in a second all in favor.
[16:36]
I oppose motion carries we have updated set policy.
[16:44]
Number 10 electric parallel generation PSC by back.
[16:49]
PSC tariff update and GL you join the filing authorization that is a mouthful.
[16:56]
Yes.
[16:59]
So this item relates to how much of the utility compensates customers who generate
[17:03]
their own electricity primarily through rooftop
[17:05]
solar and provide the access back to our system.
[17:09]
We currently have about 55 customers with customer generation and I should note
[17:13]
that not all of them actually have access to maybe remember here half ish.
[17:20]
I have access at least a few months of the
[17:23]
year and generally it's the summer months.
[17:27]
Our existing buyback rate is six point one eight cents per kilowatt hour and this
[17:31]
is basically generate based generally on our available power cost.
[17:36]
And what happens every year is Joe and team put together updated voice basically
[17:40]
looks at our hard bills figures out what that updated cost is at this minute to the
[17:44]
PSC in January usually by February March
[17:47]
or maybe April depending how fast they are.
[17:49]
They update that rate and that updates how much we pay for access.
[17:54]
And so we have a lot of that back in 2018 is when that structure got put in place
[17:57]
and at that time customers that had solar
[17:59]
systems already installed were grandfathered in.
[18:02]
So they were grandfathered for 10 years which goes to the end of next year. So they
[18:06]
actually are grandfathered in where they get the full retail rate back.
[18:11]
So that could be nine cents or somewhere in the nine cents.
[18:19]
Over the past 18 months the public service commission
[18:22]
Wisconsin has approved changes for Wisconsin utilities.
[18:25]
They basically started with the industrial utilities and now we're starting to see
[18:29]
movement to the municipalities and should note that cooperatives aren't governed by
[18:32]
the public service commission they make their own rules locally.
[18:36]
They don't have any PSC oversight.
[18:38]
But anyway they changed the methodology and looking to move more from an avoided
[18:42]
cost structure into a market based approach rather than using a single avoid a cost
[18:48]
rate the proposed methodology considers myself their energy market their capacity
[18:52]
market to figure out along with distribution
[18:54]
losses to figure out that bio buyback should be.
[18:59]
We looked at how this methodology would affect our customers over the past three
[19:02]
years overall and you paid about just over thirty thousand dollars in apparel
[19:07]
generation credits under the proposed methodology we'd estimate the credits would
[19:11]
have been approximately twenty six thousand
[19:13]
dollars or about four thousand dollars less.
[19:17]
I think the more important thing to be considering here is that the methodology
[19:20]
would better align what we pay our customers for generation based on what the
[19:24]
market is that may be the volatility or the changes in our wholesale supply because
[19:29]
as we know right now we have a certain structure as we look to the future.
[19:33]
Martin you know we're pivoting into a different structure that's going to create
[19:37]
volatility and giving a market signal is probably is a better approach and that's
[19:41]
why the PSC is pushing people towards that.
[19:45]
The utilities members have been monitoring some of the impacts of the PSC and the
[19:50]
changes is now considering a joint PSC filing so there are basically a number of
[19:55]
utilities would go together and submit basically one filing to the state.
[20:00]
This joint filing would allow us to share in the regulatory consulting costs that
[20:04]
filing versus filing individually so there's a kind of scale savings there.
[20:08]
The structure of everyone's tariff would essentially be the same.
[20:13]
What would generally what happens during a PSC filing is that there is a
[20:16]
grandfathering period so even if we did make a change that started they'll say next
[20:19]
year that PSC would likely have an order point in there that requires a five or ten
[20:24]
year grandfathering period before the new structure would actually take effect.
[20:29]
So the question for the commission tonight is if you'd like to participate in the
[20:34]
joint filing and pursue an update to our parallel generation tariffs.
[21:16]
I'm not sure if you're actually questioning to the customers this is a methodology
[21:18]
today but it's always subject to change in
[21:20]
the future based on our PSC requirements.
[21:24]
I'm sure there are but I guess nothing's I mean.
[21:29]
Yeah.
[21:31]
I'm just trying to go to a market base so it's what the MISO you know if we were to
[21:34]
go to MISO and buy energy or buy capacity that's
[21:37]
the rates that the customers would get in turn.
[21:43]
And you know they're going to be able to do the same thing annually based on what
[21:45]
the new and the big two the structures of three year
[21:47]
average look back basically to create the rate for the next year.
[22:00]
But it's and in that you were installs in the future.
[22:04]
Would that will have any impact on how these
[22:07]
rates are determined in the future or or not.
[22:11]
Yeah there's nothing from a taxation perspective that's associated with it.
[22:15]
There hasn't been in the past and I guess for legislation may go I don't see it but
[22:20]
it's unlikely unlikely from my perspective that would see correlation.
[22:29]
Nick do you have a sense of what the cost of this filing would be. It looks like
[22:33]
this change would save the utility a little bit of money but it could cost us more
[22:39]
to go through the filing process than what we'd be saving.
[22:47]
So if we do a full rate case it's a pretty costly endeavor. This is called a tariff
[22:53]
edit so it's usually a little less. It is less because it's just an added to our
[22:58]
tariff of 30 or 40 pages and now we're only talking about maybe five pages.
[23:04]
So actually only doing the subside.
[23:05]
However there would be a savings. I have to quantify it. I would guess if I had to
[23:15]
guess maybe instead of 10,000 it's only one to two thousand.
[23:20]
It really depends on how many people intervene in the process and how long it takes
[23:25]
to go through that. If it becomes contested by
[23:28]
interveners and working through that process and the legal cost.
[23:32]
But being split amongst 10 others versus solving ourselves definitely savings.
[23:38]
Right and the follow up would be if this is the direction PSC is going is it going
[23:43]
to be a sooner or later thing this is would be expected that we'd go this direction
[23:48]
and if so that would make sense to do with one of the else.
[23:52]
Yeah, I mean sometimes it takes the PSC a while before they kind of standardized on
[23:57]
something and since there's just one utility at this point, it may not if we would
[24:01]
do it through a full rate case tomorrow, it may not be
[24:04]
that they make that up to you but I could see in the future.
[24:06]
Sturgeon Bay is a part of joint exchange called WPPI in my conversations with them.
[24:12]
It sounds like they have a number of their members that want to file. So I think
[24:15]
that to your point it's moving in the path
[24:18]
where it would be the standard structure.
[25:00]
I guess is what I'm trying to ask.
[25:09]
I guess regardless of what we do it's just a matter of you paying 100% of the cost.
[25:17]
If you do it by yourself versus if you do a 10 others you only pay 10% of that cost
[25:22]
and to say if it's if you if you wait four years five years it'd be whatever the
[25:30]
increase in labor costs from the attorney that
[25:33]
would help with filing things and that sort of thing.
[25:34]
I'm not talking about the cost of filing. I'm talking
[25:36]
about the calculation model change produces a savings.
[25:43]
I would say that it's a good question. When we analyze the numbers what I found was
[25:57]
we have two different size of customers. We have our PGS one which are 20 KW or
[26:01]
less and we have our PGS two which are 20 KW or more.
[26:04]
And with the way the rights are structured the PGS one customer would see a
[26:10]
decrease while the PGS two would actually see an increase because they're getting
[26:15]
more they're getting accreditation for their capacity if you will. Whereas the
[26:19]
smaller ones are not given how the structure is.
[26:23]
So the savings increase, decrease. Good question.
[26:32]
Probably depends if more 20 KW and larger come on board versus less. Right. Yeah.
[26:37]
With the reduction in tax credit we're going to see
[26:39]
less new installations and less something changes there.
[26:43]
Yeah it's hard to say because you also have the factor of changes prop hands or the
[26:48]
property changes hands and how they use electricity
[26:51]
if it's less or more could create less or more excess.
[26:56]
We also have over time these efficiencies of these units they have a decrease in
[27:00]
factor of what we're seeing with the larger system is a half a percent. So every
[27:04]
year they should in theory they should have about a
[27:06]
half a percent decrease so they should see less excess.
[27:09]
So then that should lessen the amount.
[27:14]
I would also note that as I mentioned the grandfather if we take the grandfathered
[27:20]
and provide them lower rates than that Delta
[27:23]
that I originally talked about would be less.
[27:26]
You know from where we're expecting the current study to where they are today that
[27:31]
number will come down naturally just because of the grandfather period ending.
[27:38]
I said something about grandfathered. Grandfather property changes hands
[27:42]
grandfather property changes hands as it's still grandfathered and you go in there.
[27:48]
What was the initial motivation for the change in general.
[27:54]
2018 change or this change.
[27:58]
It's a.
[28:01]
We kind of follow the investor utilities so they kind of went through the process
[28:05]
first and they came back with a rate methodology that's market based basically
[28:10]
using the market to the MISO market to be the one that sets the rates.
[28:14]
It's more.
[28:18]
It's in Jersey quality across all utilities to some entry for that buyback versus
[28:24]
us each having our own different methodology could trade in differences.
[28:33]
It's a philosophy.
[28:36]
Is trying to go on.
[28:40]
Seems like it just comes down to when is the least expensive time to do such.
[28:46]
Number one and number two. Are there any other cross
[28:48]
subsidizations that are still going on in the solar transmission.
[28:57]
Yeah I mean it still happen unfortunately. Yeah it does.
[29:01]
Especially on a residential customer because let's say you have you and I both own
[29:05]
homes are identical and every and we use the
[29:07]
same amount of power but I have solar and you count.
[29:10]
Well the utilities investment to provide you
[29:12]
power is the same investment they had to make me.
[29:14]
On a monthly basis I'm consuming a much less electricity or maybe in selling back
[29:20]
access to now the utilities not recouping that fixed cost to extend services so
[29:25]
that you're having even all the others that don't have solar
[29:28]
are paying higher rate to subsidize me that the same equipment.
[29:34]
And unfortunately until we get to time to use rates
[29:36]
and even demand billing for residential customers.
[29:39]
Unfortunately that piece is going to continue.
[29:42]
So some of this bill is often changes also slowly working out that cross
[29:48]
subsidization. Yeah you're starting to see more.
[29:52]
I want to say Mg and e might be residential time of use
[29:55]
is automatic you have to request to be in on time of use.
[29:59]
Whereas here we have one customer time to
[30:01]
use residential and turn on our employees.
[30:03]
It's a rate that customers can have that no one wants and I signed up for it.
[30:08]
But I think Phil softly across the United States you're starting to see that move
[30:11]
in and some of the drive demand rates as well we're basically the man rate is take
[30:15]
the whole all the hours in the month and basically
[30:18]
look at what was your worst hour was your highest usage.
[30:21]
You want one hour and there's a rate associated that that's
[30:24]
what our commercial and industrial customers are rebuilding.
[30:28]
And that helps you equate to the equipment that's needed to provide the service.
[30:33]
Because it's so there's this set up to settle each month or
[30:36]
does it have lost or carry over every month till end of year.
[30:41]
There's some terminology in the order point I
[30:42]
think that it's there's I think it was a chill.
[30:46]
They can have as far as if they have access. They have to request to refund.
[30:53]
Definitely.
[30:55]
We'll just settle up at the end of the year.
[30:57]
Generally.
[30:58]
Energy savings account.
[31:05]
I just wonder because Clark County they set up in December is what I've told. Just.
[31:11]
Generally don't have customers running large negative.
[31:16]
Balance.
[31:19]
Majority of the ones that I looked at other than a media.
[31:23]
They're providing access from June July and August maybe in September the other
[31:28]
months they're using more power than they can.
[31:32]
So maybe you're 20.
[31:35]
Correct.
[31:36]
Yeah there's a couple there.
[31:37]
There's a couple larger customers who are probably providing them refunds.
[31:43]
Any factory transmission costs on this as well.
[31:46]
There's a place holder for transmission but through the filings.
[31:50]
What is then.
[31:55]
The output is really bad that there is no savings from a transmission perspective.
[32:01]
So that is in there as a placeholder but
[32:03]
given zero dollars in the credit calculation.
[32:07]
The transmission providers have been able to show through reports and analysis.
[32:11]
That's the case.
[32:17]
So what do we think it.
[32:26]
Seems like it's a two stage decision.
[32:29]
We get on board with the philosophy changers.
[32:32]
If you're going to get on board.
[32:35]
It's not the time.
[32:36]
Is there a better time.
[32:40]
Well piece of that is you know right now we're talking about a four thousand dollar
[32:44]
difference even if it grows a little bit.
[32:47]
If you're looking at only having to pay one tenth we get one shot at that.
[32:52]
Because I assume who is going to continue forward.
[32:56]
With or without.
[32:57]
Yeah there are.
[32:59]
We mentioned we updated in 2018 there are a number of utilities that did do that.
[33:04]
So there's still providing retail rate as the payment for access which.
[33:11]
So there's savings.
[33:13]
Correct.
[33:15]
So from that standpoint.
[33:17]
The savings.
[33:19]
The savings we would gain from being one out of ten versus one alone.
[33:22]
Is probably at least as much.
[33:26]
Larger larger.
[33:28]
So to me it makes sense to go forward.
[33:31]
And be a part of the group.
[33:34]
Yeah.
[33:36]
One other thing to consider is that the methodology we use today is pretty
[33:39]
straightforward and the ability we're able to take our wholesale bill.
[33:43]
From Wisconsin Public Service and provide those numbers as we look to the future.
[33:47]
And not being that simple.
[33:49]
Having some other resource like this is looking at would be much more easy to
[33:54]
administer and to provide to our customers.
[34:01]
More transparent backward looking but harder to predict
[34:05]
for someone wanting to know what they might get credited.
[34:11]
Looking out into the future.
[34:13]
Correct.
[34:14]
No different than it is today.
[34:17]
That's true.
[34:18]
Changes every year.
[34:19]
Yep.
[34:23]
Yes.
[34:24]
I was leaning toward what Paul was saying earlier.
[34:26]
Earlier about now is the right time to do this because of the cost.
[34:30]
Savings and sharing in that cost.
[34:32]
But what Nick said earlier about maybe we would be an early adopter on this if
[34:37]
Sturgeon Bay is one of the first and there's a few others looking at it.
[34:39]
But if PSC hasn't settled into it, this is the methodology going forward.
[34:44]
Is there a chance there would be another one of these
[34:46]
coming up in a few years where PSC has changed the rules?
[34:50]
Now we've got to go back and do what we've just done.
[34:53]
I mean in 2018 there's been eight years and since the last time this has changed.
[34:57]
But is this the last time it would change I guess is the question.
[35:00]
And maybe you can answer that.
[35:02]
Not likely.
[35:03]
Yeah.
[35:04]
I mean I would.
[35:06]
The investor utilities are generally using that structure.
[35:09]
So it's not as though I mean while the minister
[35:11]
does there's only one minister with that structure.
[35:14]
There's investor utilities represent a much greater share of the state.
[35:18]
So there's that.
[35:20]
Yeah.
[35:21]
I mean there's always a risk.
[35:23]
You know my so is the reference here and if they change how they administer those
[35:26]
program and the energy market has been pretty stable capacity market is generally
[35:30]
stable but has gone through some changes.
[35:32]
From an annual number to a seasonal number.
[35:35]
So I mean there's definitely some potential that there could be some changes.
[35:39]
I think you always run that risk.
[35:43]
As far as looking backwards generally no it would you
[35:46]
know whatever if there was a new structure they would say OK.
[35:50]
Now going forward this will be the new structure.
[35:53]
Yeah.
[35:54]
That's what if that would happen there would be a bunch of
[35:56]
other folks who would want to have to make the same change.
[35:57]
And so you can get in with the group again.
[36:00]
Yeah.
[36:01]
If that came out another eight to ten years.
[36:10]
Under a single source contract right now.
[36:13]
The methodology that we've had aligns pretty well with that.
[36:17]
As we move into a market based.
[36:20]
More of a market based system in a way from that single source contract.
[36:26]
The new proposed concept aligns better with our future.
[36:34]
And at this point in my mind it's purely a philosophical thing the cost is so.
[36:38]
Yeah.
[36:40]
The cost difference is so negligible.
[36:42]
But it seems to me that the closer the alignment and philosophy is between how we
[36:46]
pay for our energy and how we credit our energy.
[36:51]
Reduces the chances of cross subsidization
[36:53]
between our solar and non solar customers.
[36:58]
So in my mind again it comes back to it
[37:02]
makes sense to do it but at the lowest cost.
[37:16]
When do you need a decision on this.
[37:18]
Because I'm not sensing strong consensus.
[37:22]
I believe we were targeting in October or November finally.
[37:29]
So I mean it's possible we could wait until the next meeting.
[37:34]
Obviously I'd ask the condition what more information I
[37:37]
can provide you to help you with your decision making.
[37:43]
Given that top line.
[37:46]
Where's everybody at.
[37:51]
I take a motion to to prove the change and to go with glue to join in the joint.
[37:59]
The joint action joint filing.
[38:01]
Second.
[38:04]
Yes.
[38:05]
Is.
[38:06]
Too many new members here.
[38:11]
All right. We have a motion in the second any further discussion.
[38:17]
All in favor.
[38:19]
All right.
[38:22]
Motion carries.
[38:25]
Number 11.
[38:26]
You.
[38:27]
Project resolution.
[38:30]
Yes so this item relates to the proposed geo you marshall.
[38:34]
This resolution formally confirms that I'm using tennis to participate in a project
[38:39]
with a 30 percent ownership interest with the remaining remaining interest.
[38:44]
The project is being developed as a natural gas generation with fuel backup
[38:48]
resource here in Marshfield to provide long
[38:50]
term capacity energy and reliability benefits.
[38:53]
The purpose of the resolution is really to document our intended participation and
[38:58]
allow us to continue to project development.
[39:02]
It authorizes our staff and consultants legal counsel and others to continue to
[39:05]
work through this ownership structure with construction operating agreements site
[39:11]
arrangements financial costs allocation whether it's or requirements.
[39:15]
This referendum doesn't bind us financially to any financial commitment other than
[39:20]
those those costs that were occurring now from bidding and permitting and such
[39:25]
before we would be obligated to fund construction and her debt.
[39:31]
That revenues and to enter into the final agreement those items will come back to
[39:35]
the commission and council for review and approval.
[39:38]
If you're if the commission is supportive of moving forward with this resolution
[39:42]
tonight they would then be presented to the common council
[39:44]
for the consideration of slightly at the September 22nd meeting.
[39:50]
Sir motion to approve this resolution.
[39:54]
I'll move to approve the motion by Mike second by Dan discussion.
[40:01]
Just to confirm Nick the resolution firms are intent to participate but doesn't
[40:08]
define the size or scope of that project evolving.
[40:12]
Yes.
[40:20]
Discussion.
[40:23]
The next step.
[40:26]
Very long and windy.
[40:28]
Yes.
[40:29]
All right.
[40:29]
We have a motion in the second.
[40:30]
All in favor.
[40:31]
I oppose.
[40:34]
Motion carries.
[40:38]
12 job orders.
[41:00]
No.
[41:01]
Number 13 bills and payroll.
[41:06]
Sir motion to pay bills to approve the bills and pay.
[41:10]
So Paul second.
[41:13]
Second.
[41:15]
Discussion.
[41:18]
I would say over time is higher with the
[41:19]
generally related to operating in the power plant.
[41:22]
Hours around hours.
[41:24]
So that's where a lot of that that higher
[41:26]
percentage share if you will in the payroll.
[41:30]
And just to note on general bills were general bills were pre payments.
[41:34]
I think it's probably known but so pre payments are those the correct people.
[41:39]
Pre payments are those that we've already paid because they have like a net net
[41:43]
term that was going to occur before the commission meeting or they're just regular
[41:47]
payments that we make versus general bills are those
[41:49]
that are still outstanding and haven't been paid yet.
[41:52]
So you're proving both sides.
[41:56]
All right.
[41:58]
Thank you for the added color.
[42:00]
We have a motion to second all the paper.
[42:02]
I opposed.
[42:06]
All right.
[42:06]
That motion carries.
[42:08]
Previous meeting minutes from August 10 meetings are motion to approve those.
[42:14]
So by Nate second by seconded Mike.
[42:19]
Any proposed changes.
[42:22]
If not all in favor.
[42:25]
Opposed.
[42:27]
Motion carries back to adding for financial reports.
[42:31]
This month.
[43:00]
I mean it looks good having a footnotes and it's helpful.
[43:03]
So that was good.
[43:05]
And then on the cash.
[43:07]
The cash account status.
[43:10]
There's just two bar graphs for July August.
[43:12]
What will happen is our intent there is it
[43:14]
would be more of a one year or two year look.
[43:17]
Sure.
[43:18]
Hopefully there was self and then you can
[43:20]
see in the description of the key if you will.
[43:23]
It says the target and then the numbers
[43:26]
within the graphs are showing more of a wrap.
[43:29]
I would note that the cash.
[43:31]
The cash account status.
[43:34]
The unrestricted funds is at 115.
[43:36]
That target is at 120.
[43:38]
I think we're starting to recognize that in the policy we
[43:40]
may need to make a change because that volatility is timing.
[43:43]
There are parts.
[43:44]
Time is during the month and we're actually over 120.
[43:46]
But the last day of the month this is when we start to put together.
[43:49]
If we're not above or below.
[43:51]
So that's what's causing the volatility.
[43:55]
It wouldn't surprise me with the changes we
[43:57]
made that we would discover some things like that.
[44:01]
The cash flow summary will be added a five year or four year look if you will.
[44:05]
And that's how graphically you're going to see.
[44:08]
And that's the net of inflow and outflows.
[44:11]
You can see in April in November when you
[44:13]
have bond payments and pilot payments and such.
[44:16]
Where principal interest responds and then pilot and
[44:19]
then an excess or a negative cash flow if you will.
[44:23]
And the other ones are generally positive.
[44:27]
January you can see sometimes you're at some negative.
[44:29]
I'm guessing that's usually like a road project.
[44:32]
I need to report to come up for information only.
[44:40]
So it's just questions.
[44:42]
Who's got questions?
[44:49]
No questions.
[44:51]
The session for Wisconsin State statute 19.85.
[44:56]
See considering employment promotion compensation or performance evaluation data of
[45:02]
any public employee over which the governmental
[45:04]
body has jurisdiction or exercises responsibility.
[45:08]
For the purposes of discussing the commission's self evaluation and personal.
[45:14]
And approval to go into closed session for Wisconsin State statute 19.85.
[45:19]
Deliberating or negotiating the purchasing of public properties the investment of
[45:24]
public funds or conducting other specified public business.
[45:28]
Whenever competitive or bargaining reasons require a closed session.
[45:32]
For the purpose of discussing well number 19
[45:34]
and number 24 access he's went to agreement.
[45:37]
Our field generation project proposals in
[45:41]
Wisconsin Public Service Corporation term sheet.
[45:44]
Is there a motion to go into closed session.
[45:48]
John second by second.
[45:52]
Thank you.
[45:53]
Brian.
[45:55]
All in favor.
[46:02]
Opposed.
[46:04]
Take a minute to week before we can.