We declare the meeting of the
[0:06]
Oxford Township Planning Commission
[0:11]
open today, Tuesday, September 29, 2026, at 7:00 p.m.
[0:14]
Let's stand for
[0:15]
greetings.
[0:18]
I pledge
[0:18]
allegiance to the flag of the
[0:20]
United States of
[0:21]
America and to the republic for which it
[0:22]
stands,
[0:23]
one nation under
[0:24]
God, indivisible,
[0:25]
with liberty and
[0:26]
justice for
[0:27]
all. Madam Secretary,
[0:32]
please conduct a
[0:33]
roll call.
[0:34]
Ballard is
[0:35]
present.
[0:36]
Flynn is
[0:36]
present.
[0:37]
Nok is missing. The dust is
[0:40]
present.
[0:40]
Schultz is
[0:41]
present.
[0:42]
I move to
[0:46]
approve
[0:46]
the absence of Regina
[0:48]
Nock. I
[0:49]
support.
[0:50]
Sorry. Support
[0:52]
from Schultz.
[0:53]
Everyone for it?
[0:54]
I am against it. No. OK. Is
[0:58]
there a proposal
[0:59]
to approve the agenda
[1:00]
for today,
[1:01]
September 29?
[1:02]
I propose
[1:03]
to approve the agenda
[1:04]
for today,
[1:06]
September 15, 2026. Mr.
[1:07]
Chairman, let me
[1:08]
interrupt briefly,
[1:10]
I wanted to know if
[1:12]
you have seen the
[1:13]
10,000 Industrial case review, the
[1:14]
submitted plan, the response,
[1:15]
and
[1:16]
the comments sent by
[1:17]
Commissioner
[1:18]
Pilak.
[1:20]
I wanted to know if
[1:21]
you would like to discuss
[1:22]
this in more
[1:23]
detail today. So, I
[1:24]
think we are on the
[1:25]
right track. I
[1:27]
have printouts of what
[1:28]
they printed
[1:29]
on a large scale,
[1:30]
and another possible
[1:31]
option that might
[1:33]
go with or
[1:34]
complement this.
[1:36]
Otherwise, we
[1:37]
decide for ourselves how to
[1:38]
act, guided by
[1:39]
your instructions and
[1:41]
resolutions. But
[1:44]
at the risk of
[1:44]
repeating myself, is
[1:46]
this the
[1:47]
chairman's sole decision
[1:48]
or should the
[1:49]
other commissioners be consulted?
[1:50]
You decide.
[1:51]
Do you want to add this? Yes.
[1:53]
And then Yes. Mario
[1:54]
saw it, and he also
[1:56]
saw the response from
[1:57]
Leslie.
[1:58]
What are your thoughts?
[2:01]
I noticed that. But
[2:02]
I didn't have the
[2:03]
opportunity to
[2:04]
look into it in detail.
[2:06]
Therefore, I now propose to
[2:07]
put this on the agenda for the
[2:08]
next
[2:09]
meeting.
[2:11]
Of course? And they
[2:13]
can continue
[2:14]
building without
[2:15]
it. Some things
[2:17]
may not happen near the end of the year
[2:18]
due to timing and
[2:19]
circumstances. In the
[2:20]
worst case scenario,
[2:21]
they will build everything, and the
[2:22]
landscaping
[2:23]
will be postponed until
[2:24]
spring, if that works out.
[2:25]
But there's no
[2:26]
need to rush. However,
[2:27]
the consequence of the delay
[2:28]
may be that this will not
[2:29]
happen until spring.
[2:31]
Yes. Besides, it
[2:32]
seems Mario
[2:33]
had additional
[2:34]
offers. So
[2:35]
the situation is a bit more
[2:36]
complicated.
[2:36]
OK.
[2:37]
I like the
[2:38]
idea of putting this issue aside
[2:40]
so everyone has a
[2:41]
chance to
[2:42]
realize what's
[2:42]
going on.
[2:43]
OK. Very good. I've
[2:45]
prepared just in case
[2:47]
you need
[2:47]
printouts.
[2:48]
But when we get
[2:49]
to the
[2:50]
commissioners' comments at the end
[2:51]
, we could formally
[2:52]
record this
[2:53]
to add
[2:54]
this consideration to the
[2:54]
agenda for the
[2:55]
next meeting
[2:56]
.
[2:58]
Now there is a motion
[3:00]
to approve the
[3:01]
agenda. The
[3:03]
agenda
[3:04]
is dated September 15.
[3:06]
Yes, for some reason I didn't
[3:07]
create a new one, but
[3:08]
the one I posted on the
[3:09]
site is from the 29th, but I
[3:10]
didn't
[3:11]
reprint yours
[3:12]
because I already gave them to
[3:13]
you. So for
[3:14]
the vote, we will
[3:15]
use the agenda
[3:17]
dated
[3:18]
tonight
[3:19]
. Yes.
[3:20]
For voting.
[3:21]
Yes. Justin's
[3:23]
probably from the 29th, and so are
[3:24]
you.
[3:25]
Yes.
[3:26]
I just handed them over
[3:27]
last week. So
[3:28]
they usually
[3:29]
get outdated ones.
[3:30]
So, we have a
[3:31]
motion
[3:32]
to approve the agenda
[3:33]
for
[3:33]
tonight,
[3:35]
September 29th.
[3:36]
Second. Who is for it?
[3:39]
I.
[3:40]
Who is against?
[3:42]
OK. Is there
[3:43]
a motion
[3:43]
to approve the minutes of
[3:45]
the meeting of
[3:46]
September 1, 2026?
[3:48]
I propose to
[3:49]
approve the minutes
[3:50]
of September 1, 2026. I
[3:52]
support.
[3:53]
Who is for it?
[3:54]
I.
[3:55]
Who is against?
[3:56]
OK. Do we have
[3:58]
any correspondence
[3:59]
?
[3:59]
OK.
[4:02]
We invite
[4:02]
the public to
[4:03]
discuss issues
[4:05]
not included on the
[4:05]
agenda. No.
[4:08]
OK. And
[4:10]
we have no
[4:12]
public hearings tonight,
[4:13]
which brings us to the
[4:14]
main event in the
[4:15]
new business—
[4:16]
the review of the
[4:17]
site plan at
[4:18]
18 South Washington.
[4:19]
Marie, I would ask you to
[4:22]
first give
[4:23]
us your assessment,
[4:25]
and then we will give the
[4:28]
gentleman present the opportunity to speak, if
[4:29]
necessary.
[4:32]
OK. Very good,
[4:33]
Mr. Chairman. Good
[4:35]
evening everyone.
[4:37]
We are here today to
[4:37]
discuss the
[4:38]
proposed
[4:39]
development of a new
[4:40]
two-story
[4:41]
building at
[4:42]
18 South Washington Street.
[4:43]
It's on the east
[4:46]
side of
[4:47]
South Washington Street,
[4:48]
south of
[4:49]
Burdick.
[4:54]
The site was previously occupied by a
[4:55]
two-story
[4:56]
building, which is
[4:57]
located
[4:58]
directly next
[4:59]
to other buildings in the
[5:02]
city's central business district. And the site itself
[5:06]
was actually
[5:07]
completely occupied by
[5:08]
the building, since
[5:09]
it is located in
[5:10]
our center. So there
[5:14]
were no natural features.
[5:17]
The applicant proposes
[5:18]
to construct a new
[5:19]
two-story building
[5:20]
with a partial basement,
[5:22]
having approximately 2,300
[5:23]
square feet on
[5:24]
each level. The
[5:27]
proposed
[5:28]
use of the first
[5:29]
floor is a restaurant, and
[5:31]
the second floor is office
[5:32]
space.
[5:35]
Restaurant and office use is a
[5:36]
permitted
[5:37]
activity and
[5:38]
building type in the C1 district,
[5:40]
based on
[5:41]
zoning regulations.
[5:43]
We note that,
[5:44]
technically, according to
[5:46]
zoning regulations,
[5:47]
this is also a
[5:49]
demolition restriction zone. On May 19 of
[5:52]
this year, the
[5:53]
planning commission granted
[5:54]
its final
[5:55]
approval to demolish the
[5:57]
original building
[5:58]
and construct a new one.
[6:01]
And, as most people
[6:02]
know, this building has
[6:04]
now been demolished.
[6:06]
So today we are here to
[6:07]
discuss
[6:08]
the construction of a new
[6:09]
facility. As I have already
[6:11]
noted, I want
[6:12]
to emphasize that
[6:13]
the site
[6:14]
was almost entirely
[6:15]
occupied by a previous
[6:16]
building, and the applicant
[6:17]
proposes to build on
[6:18]
most of it with a
[6:19]
new structure in the
[6:21]
city center. So
[6:26]
most
[6:28]
zoning requirements that are
[6:28]
usually
[6:29]
applied
[6:30]
independently are not
[6:31]
entirely appropriate here,
[6:32]
since we are in the
[6:33]
city center, and it is
[6:34]
designed
[6:35]
to provide
[6:36]
parking, transportation, and
[6:37]
other services in a
[6:38]
shared format.
[6:47]
But regarding the intended
[6:48]
purpose and
[6:49]
dimensional
[6:50]
standards of the C1 zone and the
[6:51]
form of development, the
[6:52]
use
[6:53]
of the facility itself is permitted by
[6:55]
law, as is the type of
[6:56]
two-story
[6:56]
building in this
[6:57]
area. So a
[7:01]
two-story building
[7:02]
meets these
[7:04]
building form standards. It's worth
[7:06]
noting that
[7:07]
technically the maximum
[7:08]
building height in this
[7:10]
zone is 64 feet
[7:11]
, but there is a minimum of
[7:13]
30 feet. The proposed
[7:14]
building, as shown
[7:15]
on the current plans
[7:17]
before you, is
[7:18]
27 feet 8
[7:19]
inches high. So we are
[7:20]
asking the applicant
[7:21]
to indicate how they
[7:22]
plan to adjust
[7:24]
the building to
[7:24]
meet
[7:25]
the standard, as there are
[7:27]
several options,
[7:28]
including changing
[7:29]
the height of the parapet
[7:30]
wall to 30 feet. This is
[7:35]
mainly to
[7:37]
ensure that
[7:38]
the appearance of the building is
[7:38]
consistent with the scale of
[7:40]
Washington Street and in
[7:41]
harmony with the
[7:41]
neighboring structures.
[7:47]
One aspect of the
[7:48]
building code that we
[7:49]
look at is that
[7:51]
in addition to the
[7:52]
use standards, we
[7:53]
have form standards
[7:54]
to ensure that the
[7:55]
massing
[7:56]
and scale of the building is appropriate to the
[7:58]
downtown area, and they
[7:59]
address
[8:00]
things like the width of the
[8:01]
building; as I
[8:02]
said,
[8:03]
off-
[8:04]
street parking requirements do not
[8:05]
apply here.
[8:13]
A feature of
[8:14]
the building standards
[8:15]
is the requirement to
[8:16]
ensure at least
[8:17]
70% transparency of the facade
[8:19]
on the first floor of
[8:20]
this building. This
[8:26]
purpose
[8:26]
involves
[8:27]
the use of glass
[8:28]
doors and windows.
[8:31]
Two
[8:32]
aluminum garage
[8:34]
doors are offered, which will
[8:35]
not provide
[8:36]
full access
[8:37]
to the building. They
[8:40]
will be installed
[8:42]
on a foundation
[8:43]
wall
[8:44]
about 2.5 feet high. So
[8:45]
, in the end,
[8:46]
it seems like everything should be
[8:47]
compliant,
[8:48]
but we ask
[8:49]
the applicant to provide
[8:50]
specific percentages
[8:51]
to prove
[8:52]
compliance.
[8:54]
There are other
[8:54]
standards that do not
[8:55]
necessarily
[8:56]
apply to
[8:57]
this use.
[8:58]
Another point
[9:00]
I want to point out:
[9:01]
all first-
[9:02]
floor windows facing the
[9:03]
street must be
[9:05]
transparent. So they
[9:07]
should not have the
[9:09]
type of mirrored
[9:10]
glazing that could
[9:11]
cause glare
[9:12]
or other aspects that
[9:18]
distract drivers.
[9:20]
Therefore, we must
[9:21]
make sure that
[9:22]
we can see through the glass
[9:23]
freely. We
[9:24]
simply ask
[9:25]
to clarify what kind of glass
[9:26]
will be used on the
[9:27]
facade. Additionally,
[9:34]
continuing the theme of
[9:35]
discussing the
[9:36]
architectural
[9:37]
design and style of the
[9:38]
building, they provided
[9:39]
drawings of the facades. This
[9:42]
will be a very attractive
[9:44]
building. We believe
[9:45]
that it is made in a
[9:46]
modern style.
[9:47]
More
[9:48]
current materials are used here,
[9:49]
as well as a variety of
[9:51]
materials in
[9:51]
contrasting
[9:52]
combinations. So it's not a
[9:53]
monotonous building.
[9:58]
The only thing worth
[9:58]
noting is that the
[10:00]
horizontal and
[10:01]
vertical walls
[10:02]
create a very
[10:03]
massive and
[10:03]
uniform look.
[10:08]
Another feature of
[10:09]
the ordinance
[10:10]
is that
[10:11]
buildings must be
[10:17]
compatible with
[10:17]
adjacent structures
[10:19]
. However, you know, in
[10:22]
the north, it's red-
[10:24]
orange brick.
[10:25]
One building to
[10:26]
the south is
[10:28]
beige-painted brick with
[10:29]
black accents.
[10:31]
So, trying to
[10:34]
stick to this
[10:35]
particular style,
[10:36]
to be very rigid
[10:38]
and uniform, has
[10:39]
its advantages and
[10:40]
disadvantages. But ultimately
[10:44]
, we just want the
[10:45]
applicant to now
[10:46]
consider the
[10:47]
color scheme that
[10:49]
is being proposed and
[10:49]
make sure that
[10:51]
any masonry
[10:51]
used on the
[10:52]
facade has an
[10:53]
integrated color.
[10:56]
This is simply a sign of
[10:58]
high quality
[10:58]
building
[10:59]
materials. So, these are the
[11:01]
main questions
[11:01]
focused on
[11:02]
the design of the building. As I
[11:04]
said, this is one of the
[11:05]
points of our
[11:06]
comments regarding
[11:06]
additional
[11:07]
information: the
[11:08]
proposed
[11:09]
lighting does not
[11:09]
require any
[11:10]
special
[11:11]
standards. If
[11:12]
the applicant chooses
[11:13]
to install additional
[11:14]
lighting, we want
[11:16]
to make sure it is
[11:17]
fully shielded
[11:18]
and directed downwards
[11:19]
to avoid creating
[11:20]
glare. And regarding
[11:26]
other aspects of
[11:27]
the site that may
[11:28]
arise and that
[11:29]
the applicant may
[11:30]
wish to discuss
[11:31]
regarding signage:
[11:32]
technically the applicant will
[11:34]
need to submit a
[11:35]
separate application for
[11:36]
the installation of the sign
[11:37]
. Therefore, the fact that
[11:40]
there are no
[11:41]
details of signage on the site plan and facades is not
[11:42]
unusual.
[11:46]
Any
[11:46]
regulations in
[11:48]
effect at the time of
[11:48]
application will
[11:50]
apply to the
[11:51]
facility. So,
[11:56]
ultimately, this project
[11:57]
will provide a new
[11:58]
restaurant alternative for
[11:59]
residents and
[12:00]
visitors, and we
[12:01]
believe it
[12:02]
will complement the surrounding
[12:03]
downtown facilities
[12:04]
in this core area
[12:05]
while meeting
[12:07]
ordinance standards. Several
[12:08]
points need to be
[12:09]
addressed, as well as
[12:10]
additional information
[12:11]
. Therefore, we
[12:13]
recommend that the
[12:14]
Planning Commission grant
[12:16]
approval for the
[12:16]
site plan subject to a
[12:17]
review of the plans that
[12:19]
includes addressing the
[12:20]
issue, specifying
[12:21]
window type and
[12:22]
transparency, providing
[12:23]
building colors,
[12:24]
and any other
[12:25]
issues raised by the
[12:26]
Village Engineer or
[12:28]
Fire Chief
[12:29]
. So, I am
[12:32]
ready to answer
[12:33]
any questions
[12:34]
or comments.
[12:37]
Mario, I had
[12:39]
one question that
[12:40]
was raised during
[12:41]
your summary regarding
[12:42]
height requirements. In
[12:44]
my notes I
[12:45]
used
[12:46]
the term "facade". You
[12:47]
used the term "
[12:48]
parapet", which I
[12:49]
believe is just
[12:50]
the height above the
[12:51]
roofline that they can
[12:52]
adjust to
[12:53]
maintain the
[12:54]
maximum height.
[12:55]
Right. That's right.
[12:57]
Good.
[12:57]
This is one option
[12:59]
if they want to
[13:00]
raise the roof, raise the
[13:01]
ceiling height to
[13:02]
have more
[13:04]
space inside
[13:06]
the structure. They
[13:07]
can do it
[13:08]
too. The simple solution
[13:09]
is this,
[13:12]
but a
[13:13]
5-foot-tall fake chimney won't
[13:14]
solve the
[13:15]
fundamental
[13:16]
problem.
[13:18]
No, things like a
[13:19]
chimney or, for example, a
[13:21]
staircase leading to the
[13:22]
roof.
[13:23]
Yes.
[13:24]
These are permitted projections
[13:25]
above the elevation because
[13:27]
they are functional,
[13:28]
as the goal of the
[13:31]
form-based code is to
[13:33]
have a wall space of
[13:34]
at least 30 feet
[13:35]
to ensure
[13:38]
compatibility or
[13:39]
at least compatibility
[13:41]
and cohesion with
[13:42]
other facades.
[13:48]
Yes. This was a
[13:50]
clarification that had already
[13:51]
been made. Does Mario have any
[13:53]
questions?
[14:02]
I'll hold off on
[14:03]
my questions for now.
[14:05]
Good. because I would like to
[14:07]
hear the correct
[14:08]
application.
[14:09]
Yes. I mean, I
[14:10]
guess I have
[14:11]
one question. We did not
[14:12]
consider
[14:13]
engineering issues.
[14:15]
During a
[14:16]
site plan review
[14:17]
by Royal Professional
[14:18]
Services, a
[14:20]
potential
[14:21]
ADA issue was identified. Can you
[14:23]
say something about this
[14:24]
?
[14:26]
I can say something
[14:27]
because I worked with
[14:28]
Paul on this. Ahem.
[14:32]
The biggest problem
[14:33]
occurs during
[14:34]
construction when
[14:35]
they have scaffolding
[14:36]
in front of the building.
[14:37]
The question is how
[14:38]
people will
[14:39]
access and
[14:39]
get around this,
[14:40]
as there will be
[14:42]
very little space left for pedestrians. So
[14:43]
they're going to have to
[14:44]
build what he
[14:45]
calls a sidewalk,
[14:46]
or a canopy, or something
[14:47]
like that, and that has yet to
[14:48]
be determined,
[14:48]
designed, and
[14:49]
approved, but it's a
[14:50]
requirement on their part
[14:51]
.
[14:51]
I can
[14:52]
answer that.
[14:53]
Yes.
[14:53]
Good. Perfectly. Hmm, another
[14:55]
point in his
[14:56]
notes—they didn't
[14:57]
indicate exactly on the
[14:58]
plan where the sewer
[14:59]
and water lines would be
[15:00]
connected, but the
[15:00]
existing networks are already there.
[15:02]
They just didn't
[15:02]
mark them on the plan
[15:04]
, but they're there.
[15:04]
So they will
[15:05]
reconnect to the same ones
[15:06]
.
[15:08]
Yes. I thought it would be
[15:10]
easy
[15:10]
to show on the plan.
[15:12]
OK.
[15:16]
And I would like to ask
[15:17]
if you are considering
[15:18]
any garden boxes in the
[15:19]
backyard with
[15:24]
landscaping or any
[15:25]
other
[15:26]
vegetation.
[15:28]
Well, Leslie, why do
[15:29]
n't we use this as a
[15:30]
transition?
[15:31]
Good.
[15:32]
Hmm, to hear
[15:33]
the applicant.
[15:36]
So if you would
[15:37]
please come close
[15:39]
enough to the podium,
[15:40]
state your
[15:41]
name and your connection to the
[15:42]
object, and then we
[15:43]
will open
[15:44]
the discussion.
[15:50]
Yes. Sorry, I
[15:53]
missed it. So, we are
[15:54]
missing a brick here.
[16:03]
This is a brick for the
[16:03]
exterior
[16:04]
decoration of a building.
[16:08]
My name is Brian
[16:10]
Howard, HF
[16:11]
Architecture. I'm based in
[16:13]
Roja, I'm an architect, and
[16:14]
part of my
[16:16]
family is here. Vinnie and Lisa are
[16:19]
overseas so
[16:20]
they couldn't be
[16:22]
here, but we have a great
[16:23]
presentation with the rest of the
[16:24]
family. So,
[16:29]
to answer the
[16:30]
questions that
[16:31]
Mario raised,
[16:33]
just for color.
[16:35]
I actually increased
[16:37]
the height of the building by 30
[16:38]
feet and even have
[16:39]
a drawing of the facade to
[16:40]
show how that 30
[16:48]
feet or that 2 inches
[16:49]
was added. Did
[16:54]
you just increase the
[16:56]
eaves or something else?
[16:57]
Yes, I did not increase
[16:58]
the height inside
[16:59]
the building.
[17:00]
Of course.
[17:02]
Because, you know, I was
[17:03]
a little worried that
[17:05]
the equipment on the roof would be visible.
[17:09]
This rooftop equipment is
[17:10]
set
[17:11]
back quite far, but I don't
[17:12]
think
[17:13]
it would be
[17:14]
visible at all from the other side of the street.
[17:16]
But that only helps
[17:17]
hide it even
[17:18]
better. So this
[17:21]
minimum height of 30
[17:22]
feet that I
[17:23]
increased to actually
[17:25]
gives us more...I would
[17:26]
call it maybe not a
[17:27]
billboard,
[17:29]
if that's the correct
[17:30]
definition. This rather
[17:34]
gives the building a little
[17:35]
more visibility,
[17:37]
as it is now
[17:38]
taller than the neighboring
[17:39]
building. So this, in my opinion, is a
[17:43]
nice transition
[17:44]
from that building to
[17:46]
our new facility.
[17:50]
So, and I'll just
[17:51]
pass this around. This is
[17:54]
the color of the window frames, as well
[17:56]
as the color of the
[17:56]
front awning. This is the
[18:00]
limestone that will be the
[18:01]
lintels above
[18:02]
the windows, as well as
[18:03]
the foundation on which
[18:04]
the building stands. And this
[18:09]
will be a block with an
[18:10]
integral
[18:11]
color, which will be
[18:12]
on the side or
[18:13]
northern part of the
[18:14]
building's facade. So,
[18:16]
we don't have units
[18:18]
at the front or
[18:19]
back of the
[18:20]
building. This
[18:20]
only applies to the
[18:21]
north facade. I
[18:23]
made the
[18:24]
brickwork
[18:25]
turn at both
[18:26]
corners of this
[18:26]
north facade. You
[18:28]
can see it in
[18:29]
the drawing I
[18:30]
provided. I made a
[18:33]
turn in the brickwork
[18:34]
at both corners
[18:35]
so that when looking at the
[18:36]
building from the north,
[18:37]
the brick would set
[18:39]
back about four feet. So you won't
[18:42]
see the blocks until you get
[18:44]
four feet away, and then
[18:45]
you'll see them. The same thing
[18:47]
happens on the
[18:48]
other side, when you're
[18:49]
maybe walking down
[18:50]
the street and looking at the
[18:51]
back of a
[18:52]
building. You will also
[18:53]
see the brick
[18:54]
turning there as well. This
[18:56]
was one solution
[18:58]
that I think
[18:58]
answers your
[19:00]
question: no
[19:01]
painted blocks,
[19:02]
which I think
[19:03]
usually doesn't look
[19:04]
very good. So I
[19:07]
think it probably
[19:08]
won't be a chipped block,
[19:09]
this is the only sample
[19:10]
I had. It
[19:14]
will be just a flat
[19:15]
block, but the same
[19:16]
color with visible
[19:17]
filler. So,
[19:21]
I have other
[19:21]
north facades from the
[19:22]
previous
[19:23]
drawing.
[19:24]
They may not show the
[19:25]
same height of the parapet,
[19:26]
but they give a good
[19:27]
idea of the view from
[19:28]
the north.
[19:29]
Yes, this parapet
[19:30]
also became 8 inches
[19:31]
taller as
[19:32]
it went up the
[19:33]
stairs. So, from
[19:34]
back to
[19:36]
front it
[19:36]
increases by
[19:37]
eight inches,
[19:38]
gradually
[19:39]
rising to a
[19:40]
greater height,
[19:41]
because I did not want to have a high parapet suddenly when
[19:42]
viewed from the north
[19:44]
, and then a
[19:45]
lower one four feet later;
[19:47]
In my opinion, it does
[19:48]
n't look very
[19:49]
good. So I really
[19:52]
tried to
[19:53]
integrate this better into the
[19:54]
new
[20:03]
question about the block:
[20:04]
where is it in
[20:05]
the front, or just in
[20:06]
the back, when you look from
[20:07]
above to the south,
[20:08]
you can see that this wall
[20:10]
juts out over the
[20:10]
Charles building,
[20:11]
now it's sold,
[20:13]
that's the wall that's
[20:16]
good,
[20:19]
I also did a
[20:20]
calculation of the percentage of
[20:22]
transparency, and it was
[20:23]
74%. So,
[20:29]
thanks to the garage
[20:30]
door, my taller
[20:31]
door, and the taller windows
[20:33]
above the door, I
[20:34]
actually exceeded
[20:35]
70%. It's 210 square
[20:43]
feet on the first
[20:44]
floor. So I think I think that
[20:54]
answers all the
[20:56]
questions.
[20:58]
I think the only thing
[20:59]
left is to
[21:01]
make sure that the type is
[21:04]
clear glass.
[21:06]
This will be clear glass.
[21:08]
This is insulated
[21:09]
clear glass,
[21:10]
as the canopy will
[21:11]
actually shade it well
[21:12]
. The sun
[21:14]
will be blocked
[21:16]
by this canopy. So we're not
[21:19]
too concerned about
[21:20]
overheating or anything
[21:21]
like that that would bother the
[21:22]
visitors
[21:23]
inside.
[21:28]
As soon as the sun
[21:29]
drops lower,
[21:30]
it hides behind
[21:32]
the buildings on the western
[21:33]
side.
[21:35]
The canopy protrudes 3
[21:36]
feet, right?
[21:37]
Yes, that's right. I will be
[21:44]
happy to answer
[21:45]
questions. Are the bricks
[21:46]
you use
[21:48]
full-bodied or not?
[21:49]
Good. This is a regular
[21:50]
brick of standard
[21:51]
size.
[21:51]
Yes, they simply aren't
[21:52]
made because they
[21:53]
seem too
[21:54]
heavy.
[21:54]
Got it.
[21:55]
If we made a
[21:55]
solid brick. So,
[21:57]
I understand. But yes, it's a
[21:58]
full layer of masonry.
[22:00]
Answers. This was
[22:01]
one of the questions I
[22:02]
had because the description
[22:03]
said "facing
[22:04]
". So I sometimes
[22:06]
architects
[22:07]
do that.
[22:07]
Good.
[22:09]
Joe asked me the
[22:10]
same question
[22:11]
today.
[22:12]
Yes. After talking to
[22:13]
Justin, he
[22:14]
asked me, "I think
[22:15]
this is a real brick,
[22:16]
but let me
[22:17]
make sure."
[22:18]
Another option that
[22:19]
causes problems
[22:20]
is called thin
[22:21]
brick,
[22:22]
but since the brick
[22:24]
is not a load-bearing element, that's why
[22:27]
Yes, that was my
[22:28]
concern, that it would be
[22:29]
something like a
[22:31]
quarter inch.
[22:31]
Yes.
[22:39]
Open this building.
[22:48]
Mario also had
[22:49]
a few comments.
[22:51]
One thing about
[22:52]
lighting,
[22:54]
what are your plans for
[22:55]
that?
[22:55]
Yes. The front
[22:57]
canopy will have
[22:57]
built-in
[22:58]
lights. They
[22:59]
will shine straight
[23:00]
down onto the sidewalk. The
[23:04]
rear canopy will have a
[23:05]
different type of
[23:06]
structure near the
[23:07]
rear door, near the
[23:08]
entrance. These will be
[23:12]
ordinary wall
[23:13]
sconces mounted on the
[23:14]
wall. They also
[23:17]
shine exclusively
[23:18]
downwards. Actually, I can
[23:21]
show you a photo. While
[23:29]
you are searching. Uh, I
[23:30]
assume you'll have
[23:39]
the lighting for it as soon as you get the sign ready
[23:40]
.
[23:42]
Yes. Yes. I mean,
[23:43]
we haven't even
[23:44]
gotten to the
[23:45]
sign issue yet.
[23:47]
So, here is this
[23:48]
lamp.
[23:50]
This is an LED
[23:52]
mounted on a
[23:53]
mount. This will be from
[23:54]
behind. Right.
[23:55]
Yes. And that's
[23:57]
just for lighting the
[23:58]
back path, right?
[24:01]
Uh, not to
[24:01]
diffuse the light, but
[24:03]
just to direct it downwards.
[24:08]
And how will the
[24:09]
front door be illuminated?
[24:12]
There is a built-in light underneath them
[24:13]
, as
[24:14]
the doors are
[24:15]
in a recess. Good.
[24:19]
Um, also regarding the
[24:24]
garbage
[24:25]
dump. Are you
[24:26]
planning
[24:27]
to use an
[24:28]
existing one? Good. And,
[24:31]
Mario, you mentioned
[24:32]
removing
[24:33]
cooking oils and
[24:34]
fats. Is this... We
[24:39]
have an internal
[24:40]
grease trap in our building, in the basement of the new building, that
[24:41]
will be cleaned.
[24:43]
Of course.
[24:46]
We don't throw it in
[24:47]
some
[24:48]
grease container by the trash can.
[24:51]
This is what
[24:52]
everyone else
[24:53]
downtown has to do because their
[24:54]
buildings are so old.
[24:55]
They didn't have it, and now with the
[24:56]
new internal
[24:57]
grease trap it will be
[24:58]
much better.
[25:02]
This is not usually
[25:03]
regulated by
[25:04]
zoning regulations,
[25:05]
but if we
[25:06]
do it, it will make things
[25:07]
a little easier for everyone.
[25:13]
Yes, Mr. Schur. If
[25:14]
you allow me, I'll go back
[25:15]
to what
[25:17]
Leslie was talking about earlier. Um, the
[25:18]
property line runs
[25:19]
right along the
[25:20]
back of this building,
[25:22]
on the north side.
[25:23]
So, most of the
[25:24]
territory behind
[25:25]
belongs to the village. I
[25:26]
mean, there's a
[25:27]
little strip that
[25:28]
deviates on the
[25:29]
southern edge.
[25:30]
But the back is
[25:31]
a little bit angled.
[25:32]
Yes.
[25:32]
So I had to
[25:33]
change the configuration of
[25:34]
the building to
[25:35]
get within the boundaries or,
[25:36]
in fact, not touch
[25:37]
them.
[25:38]
Of course. And to
[25:39]
answer your
[25:41]
question about
[25:41]
Paul's comment about the
[25:43]
front sidewalk, we
[25:44]
took that into account in the
[25:45]
last set of
[25:46]
permits we submitted
[25:47]
.
[25:48]
Good.
[25:48]
And we discussed this
[25:49]
directly with
[25:50]
Paul. My civil engineer
[25:52]
discussed.
[25:53]
We are not
[25:53]
required
[25:54]
to install a canopy
[25:55]
over the sidewalk. Good.
[25:57]
Because of our distance,
[25:59]
we made a detour
[26:00]
around the
[26:01]
lamppost.
[26:02]
They complied with all
[26:04]
ADA requirements around it and
[26:05]
moved the sidewalk
[26:06]
further away from the building. So
[26:08]
when you come in from
[26:09]
the south, there will be a
[26:10]
gate at the south
[26:12]
entrance of this fence,
[26:15]
it will be 8
[26:16]
feet wide for
[26:17]
workers and so on. And
[26:19]
you still have the
[26:20]
necessary
[26:21]
sidewalk width. We didn't
[26:22]
have to go into a
[26:23]
parking area or
[26:25]
anything like that.
[26:25]
Very good.
[26:29]
So, to be clear:
[26:30]
since there is
[26:31]
very little space, you are
[26:32]
not planning anything
[26:33]
along the building?
[26:36]
Simply because we do
[26:38]
n't have space.
[26:39]
Yeah, I just...
[26:40]
Yeah. No, I think that,
[26:43]
you know, maybe when
[26:45]
they occupy the
[26:45]
building and
[26:46]
open up, they'll
[26:47]
put some
[26:48]
flower pots in there or something,
[26:49]
but in terms of
[26:50]
landscaping
[26:51]
, it won't survive there.
[26:55]
You know, there's nothing
[26:56]
left there.
[26:57]
Yes. I just wanted to
[26:58]
clarify.
[26:59]
Yes. So, I guess
[27:01]
they're going to
[27:02]
do something with
[27:03]
seasonal things, I think
[27:04]
.
[27:05]
Yes. I mean, I'm
[27:06]
sure you will
[27:07]
. This is a very
[27:08]
beautiful project,
[27:09]
designed with
[27:10]
great attention to
[27:11]
detail. I'm sure
[27:13]
you'll consider all the
[27:23]
pretty Last
[27:31]
question. Joe, did the
[27:34]
DEA check this?
[27:35]
They saw the plan.
[27:36]
They're not really...
[27:37]
yeah. I mean,
[27:38]
they support...
[27:39]
yeah.
[27:39]
concerns
[27:40]
they had, or
[27:41]
No, I have one
[27:50]
question. So, on
[27:53]
your
[27:53]
administrative
[27:54]
side, we heard from
[27:55]
Brian how they
[27:56]
addressed these points
[27:58]
in your letter in the
[27:59]
recommendations section
[28:00]
. However, uh, based on what
[28:03]
we've
[28:04]
been presented with,
[28:05]
there remains a requirement
[28:06]
for formal
[28:07]
filing of documents
[28:08]
to, say,
[28:12]
confirm what
[28:13]
Brian told us today
[28:14]
. Right.
[28:15]
Yes. So, this would be a uh-uh
[28:18]
application.
[28:26]
Yes. OK.
[28:33]
Uh, does anyone have any other
[28:37]
comments,
[28:38]
questions, or
[28:38]
concerns?
[28:40]
Good. I am satisfied.
[28:41]
All my questions and
[28:43]
everything else were
[28:44]
answered thanks to
[28:45]
everything that
[28:46]
was resolved for me. Uh,
[28:48]
so I think if no
[28:50]
one else has any
[28:51]
questions, comments,
[28:53]
or statements, uh, I'll make a
[28:54]
suggestion. Uh, I am
[28:57]
making a motion
[28:58]
to approve the
[28:59]
development plan for
[29:00]
18 South Washington Street.
[29:04]
The development plan is
[29:05]
subject to the
[29:06]
recommendations and
[29:07]
requirements set forth in
[29:09]
McKenna's letter of
[29:10]
September 9, 2026.
[29:18]
OK. Uh, and also
[29:21]
yeah,
[29:21]
we need to,
[29:23]
you know, include Row in
[29:25]
this uh
[29:27]
yeah, and and a letter from the uh
[29:28]
fire department
[29:32]
well yeah, theirs is there,
[29:34]
regarding the
[29:36]
efforts supported this.
[29:42]
OK. Uh, Madam
[29:43]
Secretary, then a
[29:44]
roll call vote
[29:46]
on the motion to
[29:48]
yes.
[29:48]
Wagner,
[29:49]
yes.
[29:51]
Schultz,
[29:52]
yes.
[29:54]
Flynn,
[29:55]
yes.
[29:56]
And
[29:57]
yes,
[29:59]
thank you. Congratulations.
[30:01]
Thank you.
[30:04]
We rejoice. Congratulations. I'm
[30:07]
very happy for the building
[30:08]
, happy that this is
[30:09]
happening, and happy
[30:10]
for this business. So, oh,
[30:12]
welcome. This is
[30:14]
disappointing.
[30:17]
OK. Fantastically.
[30:18]
OK. Perfectly.
[30:20]
If all goes well,
[30:21]
when is the
[30:22]
opening time?
[30:23]
We're just
[30:24]
trying to move
[30:26]
as quickly as possible right now,
[30:28]
but we want to do
[30:29]
everything right because we're
[30:30]
focused on the
[30:31]
long
[30:32]
term. This is not
[30:34]
just a job. We
[30:37]
put
[30:39]
our whole heart and soul into it. We
[30:41]
all work as a family
[30:43]
and there are about 15 of us on
[30:44]
Mile Road. So now
[30:46]
we have to
[30:47]
split up. This is
[30:48]
too much.
[30:48]
Who will move to the new
[30:50]
place—that is the question.
[30:51]
These two.
[30:53]
Perfectly.
[30:55]
Thank you. I appreciate it.
[30:57]
And we, we love,
[30:58]
you know, we women
[31:00]
love to decorate, and
[31:01]
chefs
[31:02]
come up with new ideas every season.
[31:07]
We change our
[31:08]
specials every
[31:09]
four months, and that's what I was
[31:10]
telling
[31:12]
our customers at work today
[31:13]
: when you
[31:14]
come to our
[31:15]
restaurant, you're home.
[31:16]
So even if you
[31:17]
break a plate, it's okay
[31:18]
. You are
[31:20]
at home.
[31:23]
Put it in
[31:33]
our environment, you
[31:36]
know. We are very
[31:40]
detailed
[31:41]
about everything because we like
[31:43]
to be impeccable,
[31:44]
because if the customer is
[31:45]
happy, then we are
[31:46]
happy, and it's just,
[31:47]
you know, we like to
[31:48]
create a great
[31:49]
community around
[31:50]
us, and
[31:51]
when people
[31:51]
come back, it
[31:52]
makes us feel like
[31:54]
we are all one big
[31:55]
happy family. That's what
[31:56]
we're saying, uh, we're one
[31:58]
big happy
[32:00]
family. We just
[32:01]
love it. And my
[32:02]
brother and I will continue to
[32:04]
do this for the
[32:05]
next, hopefully,
[32:06]
30-40 years, as long as
[32:07]
we live.
[32:08]
This is what we love to
[32:10]
do. We've been working since we were
[32:12]
11-12 years old, and even though we
[32:13]
both graduated from
[32:14]
college, we still
[32:15]
stayed with our
[32:16]
parents because we
[32:18]
just love our
[32:19]
jobs.
[32:22]
Fantasy.
[32:23]
We started with this.
[32:24]
We tried to get out of
[32:25]
this.
[32:28]
They are back again.
[32:29]
Something simple. Thank you,
[32:35]
Brian. Good job.
[32:42]
Okay, we have no
[32:43]
old cases, no
[32:44]
comments from
[32:45]
the public, just
[32:47]
comments from
[32:47]
consultants and
[32:48]
administration.
[32:50]
I just want to
[32:50]
thank all of you
[32:51]
for changing
[32:52]
your schedules and being able to
[32:53]
come tonight
[32:54]
. And as I
[32:55]
mentioned earlier, this
[32:56]
will replace
[32:57]
next week's meeting.
[32:59]
We won't have anything next week.
[33:00]
So thank you for doing
[33:02]
this for them. Let's give them another
[33:03]
week.
[33:04]
Of course. Of course. Both that and
[33:06]
our schedule.
[33:07]
This was important. And I
[33:08]
will take this opportunity,
[33:09]
for the record, to
[33:11]
thank Joe for
[33:12]
preparing the package of
[33:13]
documents and
[33:14]
submitting it to the
[33:15]
commissioners.
[33:16]
Personally delivered.
[33:18]
I don't know where
[33:19]
Dave lives. We had to
[33:19]
come and pick
[33:20]
him up. So,
[33:21]
sorry. I didn't stop by
[33:22]
.
[33:23]
This is intentional.
[33:25]
I am happy to do this.
[33:27]
Especially when there are such
[33:28]
printouts, and
[33:28]
printing them on
[33:29]
larger
[33:30]
format paper is exactly what is
[33:31]
needed. Uh, and that
[33:32]
gives you, you know, you
[33:34]
can get a chance to
[33:35]
review them.
[33:36]
We will ensure this
[33:37]
when such
[33:38]
printouts are available.
[33:39]
Yes.
[33:41]
Dave, any news
[33:42]
from the
[33:43]
township planning commission?
[33:44]
Yes. So, we are deeply
[33:46]
immersed in drafting an
[33:49]
ADA center ordinance. We held a
[33:50]
large public
[33:51]
hearing, attended by
[33:52]
about 400 people.
[33:54]
Um, we're planning
[33:55]
another public
[33:56]
hearing, probably
[33:58]
in early November,
[33:59]
to come to some sort of
[34:00]
decision. Yes, I think
[34:02]
we're about 80% done
[34:03]
with the
[34:04]
resolution. We are now
[34:06]
reviewing
[34:07]
public comments and
[34:08]
working to
[34:09]
incorporate their
[34:10]
concerns. And just so
[34:12]
you know, to make it
[34:13]
clear: no one
[34:16]
contacted us, the village administration,
[34:17]
about building a
[34:18]
data center.
[34:20]
We introduced a
[34:21]
regulation, uh,
[34:22]
postponing the
[34:25]
moratorium, uh, for a year
[34:26]
last November.
[34:28]
So we have time between now
[34:29]
and
[34:30]
mid-November
[34:31]
to finalize
[34:32]
the resolution, and there
[34:35]
are no non-disclosure agreements here. Nobody communicates with anyone
[34:37]
. So
[34:38]
at the moment,
[34:39]
nothing is happening behind the scenes
[34:40]
. We are
[34:41]
simply focused
[34:42]
on this resolution.
[34:45]
OK. Thank you ZBA or DD. Are
[34:49]
there any other
[34:49]
comments from the
[34:51]
committee members?
[34:53]
Uh, I just want to
[34:55]
say that it's really
[34:56]
nice when the
[34:57]
document packages and
[34:58]
site plans are as
[34:59]
complete as they were
[35:00]
today, because there
[35:01]
were times when
[35:02]
they were incomplete
[35:04]
and people had to
[35:05]
keep coming back
[35:06]
, they didn't have
[35:07]
the answers, and they
[35:08]
weren't ready. So
[35:11]
thank you, uh, you know,
[35:12]
for the administrative
[35:14]
part, and thank you to
[35:15]
Mario for
[35:16]
preparing such a
[35:17]
well-
[35:17]
rounded
[35:18]
package of documents. It makes
[35:21]
our job a lot easier
[35:22]
, so that we can,
[35:24]
uh, so that we can
[35:25]
and that they
[35:26]
invited
[35:27]
an architect here with
[35:27]
ready-made answers
[35:28]
.
[35:29]
Yes, that's great.
[35:30]
Yes.
[35:30]
So thank you.
[35:31]
Please.
[35:32]
This is the best part.
[35:34]
Good. Then, uh, with
[35:36]
that, I
[35:39]
propose to adjourn the
[35:41]
meeting at 7:35.
[35:42]
I support this
[35:43]
proposal.
[35:43]
OK. Accepted.