Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
These are YouTube's auto-generated captions, not a human transcript — expect occasional errors, especially with names and technical terms.
[0:03]
Good morning everyone and welcome to the
[0:05]
July 20th special committee of the whole
[0:08]
meeting. The city of Parksville
[0:10]
recognizes the people of the coalish
[0:12]
nations and their traditional territory
[0:14]
upon which we gather with gratitude.
[0:17]
Up front we have uh one report on the
[0:19]
agenda along with a presentation from
[0:21]
consultants KWL uh for the manager of
[0:24]
utilities an update on the water use
[0:26]
planning and management study phase one.
[0:29]
Uh do we have that delegation right now
[0:37]
before we move forward?
[0:46]
I see them here. So I because we're
[0:49]
looking for approval to uh go to the
[0:52]
next one since the only thing ne next on
[0:54]
the agenda. So um are you gentlemen
[0:57]
appearing at the podium here? Welcome.
[1:00]
Come on down sir. Yeah nice to see you
[1:01]
again.
[1:17]
green.
[1:18]
>> You are now if you could introduce
[1:19]
yourself, gentlemen, and uh we'll get
[1:21]
with ready. Looking forward to your
[1:22]
presentation today. Thank you.
[1:24]
>> Thank you, Mr. Mayor. I'm Steve Bridger
[1:27]
with the with Kerwood Lidell Consulting.
[1:29]
Uh and I am the project manager for the
[1:32]
uh water use planning and management
[1:34]
study.
[1:36]
And uh yeah, I'm Craig Southerntherland
[1:38]
with Kerwood Lidle uh Associates and I'm
[1:41]
senior hydraologist and and uh technical
[1:44]
engineer on the supply side for the for
[1:47]
the study.
[1:47]
>> Great. Welcome.
[1:50]
>> Thank you.
[1:52]
Yeah, we have a a brief
[1:54]
presentation to start and then
[1:56]
understand that there's a number of uh
[1:58]
questions uh to go through uh for the
[2:01]
remainder of the meeting.
[2:05]
Yes,
[2:06]
if we could hold our questions uh until
[2:08]
after the presentation, council, and
[2:10]
then we'll get into it a little more
[2:12]
detail then. Thank you.
[2:15]
>> Sounds great.
[2:17]
>> Um okay, so here's the cover cover slide
[2:21]
for the uh study and maybe we can jump
[2:24]
to uh slide number one, please.
[2:27]
Uh so just to do a an overview of the
[2:30]
goals of the project as per the um
[2:34]
request for proposal as as it was stated
[2:37]
initially uh was to review and complete
[2:40]
a comprehensive assessment of the city's
[2:43]
the city and the Englishman River water
[2:45]
supply uh source audible w audible water
[2:50]
sources as well as um the demand and
[2:54]
future demand for the city along with uh
[2:56]
the noose area
[2:59]
um which the system all feeds. Um so
[3:03]
essentially um there was a capacity
[3:05]
analysis to determine what the how we're
[3:09]
going to how we can meet the future
[3:11]
demands and a review of uh this existing
[3:14]
storage including surface water sources
[3:17]
and groundwater sources to see what is
[3:20]
needed to service the system over a
[3:22]
50-year time frame
[3:25]
including the obviously the current
[3:28]
conditions.
[3:29]
Um, additionally, the report was uh to
[3:32]
focus on existing water conservation
[3:34]
measures and what measures can be
[3:37]
further implemented to uh assist with
[3:40]
reducing water demand in the future as
[3:44]
well as take a brief look at the
[3:45]
hydropower generation options if there
[3:48]
was to be a new uh surface water source
[3:50]
implemented. So, that's that's
[3:53]
summarized in our report which I believe
[3:55]
was circulated uh about a month ago.
[3:59]
Um and just to touch on the key water
[4:02]
supply reliability
[4:04]
um focus for the system. Um everything
[4:08]
was studied under um the need to meet
[4:12]
sort of um um I guess best practices for
[4:18]
water supply reliability.
[4:21]
uh and taking a detailed look at what
[4:22]
the current system water reliability is
[4:25]
and and the system effectively or today
[4:28]
the Aerosmith reservoir is the primary
[4:31]
source with an effective volume of uh 9
[4:33]
million cubic meters and approximately 2
[4:37]
million cubic meters in sort of
[4:39]
emergency storage.
[4:42]
Um there's also further um sort of restraint on the
[4:48]
system in needing to provide up to
[4:51]
approximately 1 cubic meters a second as
[4:53]
an environmental flow in the Englishman
[4:56]
River which has been uh in place for a
[4:58]
while. I think it's closer to 1.6
[5:01]
typically but and that does vary
[5:04]
depending on the uh the sort of absolute
[5:07]
minimum that can be provided.
[5:09]
Um and the study was done primarily
[5:14]
looking at uh not enacting water level 4
[5:18]
water conservation measures because we
[5:20]
want to look at uh more typical water
[5:22]
supply system where you don't want to be
[5:25]
having to implement water water
[5:27]
restrictions to that level on a regular
[5:29]
basis which obviously is a is a
[5:31]
significant goal.
[5:34]
Um,
[5:36]
>> so from there I may hand it over to
[5:37]
Craig who's going to go through some
[5:39]
more detail on the immediate analysis
[5:42]
within the study.
[5:45]
>> Thanks. Thanks.
[5:47]
>> Thank you, Steve. And, uh, yeah, thank
[5:49]
you, mayor and council for having us. Um
[5:52]
so I know um
[5:56]
there were some questions um about the
[5:59]
storage evaluation and we just wanted to
[6:02]
go through both how were the um new
[6:06]
sources screened, what did we sort of
[6:08]
use as the original sort of screening
[6:10]
criteria and then how were they
[6:11]
evaluated. Um so the in terms of
[6:15]
screening we focused on storage
[6:18]
opportunities within the the Englishman
[6:21]
River wershed and the local aquifers. Uh
[6:25]
so we weren't sort of looking out beyond
[6:27]
in terms of like re like looking at it
[6:29]
sort of regionally. It was really
[6:30]
focused on what's available for for the
[6:32]
city and for the news. um and with a
[6:35]
focus on the Englishman River wershed.
[6:37]
Um we had um and that was sort of
[6:41]
through through um conversations with staff. Um we the the reliability
[6:48]
target uh was established at 29 out of
[6:51]
30 years or or 90% reliable and that was
[6:54]
based on a review of some of the
[6:57]
guidelines that are available and what
[7:00]
other communities are doing um around
[7:02]
the region and and again that was um
[7:05]
based on some discussions that we had um
[7:07]
at workshops with with staff. And then
[7:11]
finally um was it technically feasible
[7:14]
um looking at topography like gravity
[7:17]
versus pumping storage um and and just
[7:20]
sort of other technical uh technical
[7:22]
criteria. That was sort of the initial
[7:24]
screening evaluation. And then we did a multiple a preliminary multiple
[7:30]
accounts evaluation looking at um or the the storage options that were
[7:36]
selected.
[7:38]
Looking at um capital costs, uh the um
[7:43]
construction feasibility,
[7:45]
technical feasibility, um regulatory
[7:48]
risks, environmental benefits costs. um
[7:50]
but at a sort of semi-quantitative
[7:52]
level. So sort of assigning like okay
[7:55]
high to low. It wasn't it wasn't a sort
[7:57]
of a a detailed evaluation but it was to
[8:00]
be able to provide a way of being able
[8:01]
to rank the different options. Um and
[8:06]
we um so I think maybe Steve can slide
[8:09]
over to the next slide there.
[8:12]
Um yeah. So based on that um we
[8:17]
identified uh um
[8:21]
four wersheds within the um subwaterheds
[8:27]
within the Englishman River wershed and
[8:30]
five potential storage locations um that
[8:34]
are all sort of headwater storage
[8:36]
similar to the way that Aerosmith works.
[8:39]
Um and
[8:42]
a lot most of these had been identified
[8:45]
previously in previous studies in terms
[8:48]
of um from the like the past regional
[8:51]
studies and main the main reason for
[8:53]
that is they're they're the kind of
[8:55]
locations where there's either an
[8:58]
existing lake or there's an area where
[9:01]
the topography works that for every
[9:04]
incremental height of a dam that you
[9:05]
need to construct you get quite a bit of
[9:07]
storage. So that was sort of the main
[9:08]
focus is to try and find those those
[9:10]
locations um to come up with sort of the
[9:13]
best um unit cost per cubic meter of
[9:18]
storage. And um and those
[9:22]
similar to the past studies kind of came
[9:24]
up with the same locations. Um and so
[9:28]
those were sort of the main primary
[9:30]
ones. In addition, we did we did look at
[9:34]
the option to raise Aerosmith and we did
[9:37]
look at side side storage um side um
[9:43]
off channel riverside storage options
[9:45]
and and I'll go through that in in a
[9:47]
minute or two here. Um but the
[9:50]
essentially these of these five options
[9:56]
um four of them the costs are all like
[10:00]
they're in the same ballpark especially
[10:02]
given the way that these cost estimates
[10:04]
were developed. They're preliminary at
[10:06]
this point and it's really order of
[10:07]
magnitude just to give us a sort of an
[10:09]
order of magnitude sense and so we've
[10:13]
except for Morardi Creek which is
[10:16]
significantly more
[10:18]
um and so the outcome of that was to
[10:21]
focus on those four options as part of
[10:26]
future evaluation.
[10:29]
One thing to keep in mind is when we
[10:31]
were doing the evaluation, we looked at
[10:33]
each storage site individually. We said,
[10:36]
can this site alone provide and meet the
[10:39]
reliability target? We didn't get into
[10:42]
the looking at can we combine them? Can
[10:46]
we phase it? We we didn't get into that
[10:49]
level of detail and in phase one. Um so
[10:51]
there's there may be some opportunities
[10:53]
for that moving forward. Um so yeah the
[10:57]
next slide. Um so the other source of
[11:02]
supply for Parksville is uh is
[11:05]
groundwater um in aquifer 216
[11:09]
and there's our groundwater
[11:12]
hydraologist. I'm a surface water
[11:14]
hydraologist so I can speak at a high
[11:16]
level around some of this but um our
[11:19]
groundwater hydraologist identified that
[11:20]
there is maybe some some potential for
[11:24]
additional um withdrawal from from the
[11:27]
aquifer. uh the acryer t like appears
[11:31]
right now to be able to recover based on
[11:33]
its current um uh withdrawal rates and
[11:37]
so there might be some potential there
[11:39]
to provide some additional um flow from
[11:42]
the aquifer to help support the demand
[11:44]
in the community to help reduce the the
[11:46]
demand on the river. Um there were also
[11:50]
two other aquifers that are located
[11:55]
about 8 to 10 km um south of the city
[12:00]
that could also potentially be a new
[12:02]
source of groundwater. Um but there's
[12:04]
very there isn't a lot of information on
[12:06]
those and so there would need to be
[12:07]
further study done to to confirm that.
[12:11]
Um
[12:14]
so in terms of the off channel storage
[12:18]
um so we looked at two. So the the first
[12:21]
that we looked at was an applesto apples
[12:25]
comparison
[12:26]
with the um the other storage sites. So
[12:30]
the other storage locations there was
[12:33]
storage required both for um the
[12:36]
community withdrawal as well as meeting
[12:39]
the the environmental flow need. Um and bringing those both up to the 90
[12:45]
97%. Um and so just to look at it sort
[12:50]
of in terms of the the equal cost um
[12:52]
there's it requires um a res a reservoir
[12:57]
between 100 or 80 to 160 hectares
[13:00]
depending on the um the geometry of the
[13:05]
pond. So, how essentially how deep can
[13:07]
it can it physically be? And um the
[13:11]
intent would be to either divert water
[13:14]
into it or pump water into it through
[13:17]
the winter and then use that water in
[13:19]
the summer. And the rate that that would
[13:22]
need to be to fill that is about um 22
[13:25]
million liters per day. And for
[13:27]
comparison, the current pump station is
[13:32]
um uh
[13:34]
>> 16. Yeah, 16 or 19. Like the the the
[13:38]
pump station's 19. Um and uh so just in
[13:43]
terms of a comparison. Um and and so
[13:46]
that would be running um at that rate
[13:49]
for 6 months um to to fill it. And the
[13:53]
construction estimate was about 72
[13:55]
million. Um so it's about $15 um per
[13:58]
cubic meter and whereas the other
[14:00]
surface water stoages were sort of
[14:02]
between like a dollar 70 to $5 a cubic
[14:05]
meter depending on the site. So just in
[14:07]
terms of a comparison um just to give
[14:10]
you sort of a sense um let me just
[14:12]
double check. I've got the uh um
[14:18]
the sizes here. Um
[14:27]
so
[14:29]
the um 4.8 million cubic meters. If you
[14:35]
think about the size of um of Wrath
[14:39]
Driver Park, um the whole park, it's
[14:43]
about four meters of water over that
[14:46]
area, just to kind of give you a sense
[14:47]
of scale. Um and and so so it's a bit
[14:52]
it's a big area. Um and and so that's
[14:54]
kind of that's one of the reasons. Um so
[14:56]
if we go to the next the next slide.
[15:00]
So another option um would be so what is
[15:04]
the demand that the communities will
[15:07]
need through the summer um by the 2080s
[15:11]
um and this was assuming the current
[15:14]
withdrawal rates from the groundwater um
[15:17]
and it's about 2.9 u million cubic
[15:19]
meters for and that's from June to
[15:22]
October which is sort of typically the
[15:25]
operating period for the dam and so that
[15:29]
would essentially mean not withdrawing
[15:31]
any water from the river over that
[15:33]
period. And for that case again it's
[15:38]
about 50 hectares to 100 hectares again
[15:41]
depending on the depth that you can get
[15:43]
to. And um it's closer to about it's
[15:46]
just a little bit less than the current
[15:47]
in terms of pumping rate. It's a little
[15:49]
bit less than the current pump station
[15:50]
for 6 months. Um they estimate again
[15:54]
high level estimate is about 44 million
[15:57]
approximately.
[15:59]
um and uh and then compar comparison to
[16:01]
the other ones. So based on that was we
[16:04]
sort of um concluded that just for cost
[16:09]
reasons as well as for land reasons um
[16:11]
in terms of both the cost of land the
[16:14]
value of land as well as land use
[16:16]
considerations um that that it just it
[16:19]
wasn't economically feasible to sort of
[16:21]
pursue those options. Um so that was the reason kind of in going
[16:26]
through the report. We could have
[16:28]
expanded on that a little bit more in
[16:29]
the report. Um so apologies for that. Um
[16:32]
but this provides a bit of background on
[16:34]
yeah on on the on the reasoning for it.
[16:37]
So um
[16:39]
so kind of continuing on um we also uh
[16:44]
in terms of increasing storage at at
[16:47]
Aerosmith
[16:49]
uh it would be so there's two parts of
[16:53]
this. One is the in the long term um
[16:58]
relying solely on Aerosmith because of
[17:00]
the limited watershed area um isn't going to be able to meet that
[17:05]
reliability target just because of the
[17:07]
limited inflow to the reservoir um
[17:10]
through the even through the through the winter um
[17:14]
it is a it is small it's it's like one
[17:17]
and a half% of the whole wershed area
[17:20]
and so however Um there there could be
[17:25]
an opportunity in terms of phasing to to
[17:28]
raise the dam as a first step, but and
[17:31]
then that would help sort of provide
[17:34]
some improvement in the reliability.
[17:37]
Um and then move on to a a a more a
[17:41]
larger uh raising a larger increase in
[17:45]
the storage based on on a more detailed
[17:48]
evaluation of a sort of a phasing
[17:50]
option.
[17:52]
the what this would mean is be raising
[17:54]
the dam by about three meters. Um and um
[17:58]
again it wasn't considered more in phase
[18:00]
one on its own because it just wouldn't
[18:02]
meet the reliability target in the
[18:03]
future. Um but as I say in the slide it
[18:06]
could be considered as part of a phasing
[18:08]
in the future potentially.
[18:11]
Uh and the yeah the the cost for this is
[18:16]
sort of in the probably the 5 to 10
[18:18]
million kind of range. Um or um just
[18:23]
without sort of
[18:26]
because there would likely need to be
[18:28]
sort of some additional upgrades to the
[18:30]
dam besides just raising the crest of it
[18:32]
um from a stability standpoint and
[18:34]
seismic standpoint. Um so that was uh
[18:39]
so on the next slide please. Um yeah and so this is just some other
[18:48]
background information um for this study
[18:51]
and we can refer to these um in through
[18:55]
the rest of the meeting if we need to.
[18:57]
Um there's some extra slides here just
[19:00]
that we can go to if we need to to to
[19:02]
refer to anything. Um,
[19:06]
oh yeah. Um, yeah, classic. Again, the
[19:10]
gray doesn't show up. Um, so, so this
[19:13]
is, yeah, [laughter]
[19:16]
so on the side it does, it doesn't show
[19:17]
up on the front. Um, so this is a
[19:20]
similar side. This is the same slide
[19:21]
that we showed previously and it
[19:23]
essentially shows like the contributions
[19:26]
of the different components in the um of
[19:30]
flow in the Englishman River. The gray
[19:32]
is the natural base flow. That's just
[19:33]
how much is naturally coming off the
[19:34]
watershed. The um the blue is what the
[19:39]
withdrawal is at the plant. Um the the
[19:42]
green is is how much the the dam um is
[19:47]
releasing to support the environmental
[19:49]
flow needs and and the orange um which
[19:52]
is tiny little silver um is are the
[19:54]
other licenses. Um, and
[19:58]
so this just kind of go gives you a
[19:59]
sense of the range of the of of flows
[20:03]
that are in the river and and really
[20:04]
does show like there are opportunities
[20:06]
for for being able to um like there's a lot of water in the winter um
[20:13]
further down in the wershed. Um but it's
[20:16]
the challenge is trying to capture that
[20:17]
water further up in the waterershed
[20:19]
where there are the opportunities to
[20:20]
provide the storage. Um,
[20:25]
and this slide is showing uh just a
[20:29]
little bit more of a detail through the
[20:30]
summer operating period breaking down uh
[20:33]
it's essentially taking those four
[20:35]
months through the summer and just
[20:36]
providing a little bit more detail. So
[20:38]
you can really see that the the green
[20:40]
part of the pie is the environmental
[20:43]
flow need and that's
[20:45]
um how much the dam releases from the
[20:48]
dam or supporting the environmental flow
[20:50]
need in the river. So a large part of
[20:51]
the water in the in the dam is is um
[20:54]
supporting the environmental flow need
[20:57]
with the blue part of the pie being how much is being withdrawn by the
[21:01]
community during the operating season.
[21:06]
Um yeah, and then this final slide is is
[21:08]
showing the uh um the reliability
[21:13]
amounts for the current um system and sort of moving out into the future
[21:18]
with the reliability sort of decreasing
[21:20]
over time um with climate change um and
[21:24]
with increasing demand in the community
[21:29]
from sort of it's it's essentially about
[21:32]
half in terms of the reliability number
[21:34]
by the time you reach the the 2080s.
[21:40]
And um yeah, and that's
[21:50]
you did
[21:51]
>> and thank you. Thank thanks very much
[21:55]
gentlemen for your presentation and I
[21:57]
understand that I want to um qualify
[22:00]
that the last three years has been an
[22:03]
incredible learning curve for all of us
[22:06]
here at the table recognizing from our
[22:08]
participation on in the AWS boards as
[22:11]
well as the AWS boards understanding
[22:15]
what our water where it comes from and
[22:18]
where it goes to and what the province
[22:20]
is telling us what we must provide for
[22:22]
habitat and so forth.
[22:24]
Under these learnings that we have, we
[22:27]
recognize that Aerosmith Dam is pretty
[22:29]
well reserved. So we can maintain the
[22:31]
flow rate is actually reserved for
[22:34]
habitat and which is great from an
[22:38]
environmental point of view but for a
[22:41]
point of view from who paid for that dam
[22:43]
and so forth it's not so great because
[22:45]
it was a water users in the in the
[22:48]
system uh including Parksville and the
[22:50]
news with our our participating
[22:52]
collaboration with them. So, that was
[22:55]
one big learning curve that kind of
[22:59]
what's with all that water in there, why
[23:01]
don't we just release that? Why are we
[23:02]
going into um water conservation extreme
[23:05]
stage 4 now? And it's been a hard
[23:08]
message for the public to understand.
[23:10]
It's a hard message for me to understand
[23:13]
quite honestly. So um we we are
[23:16]
considering uh constantly looking at
[23:19]
maybe there's a more equitable way of
[23:21]
who's paying for the operation and uh uh
[23:24]
upgrades to the dam which is needed
[23:26]
including seismic and everything else.
[23:28]
we check on a regular basis and maybe we
[23:30]
have some participation from other
[23:32]
players such as a province which we will
[23:34]
look at at but recognizing that any of
[23:37]
your suggestions for storage that says
[23:39]
Aerrol Smith Dam I say no no no because
[23:41]
whatever we put into it type of thing
[23:43]
we're not going to get out of it but you
[23:45]
know the habitat is going to be very
[23:47]
wellmaintained which is great but at the
[23:49]
same time I think that that's for others
[23:51]
to do we are our end goal as you
[23:54]
mentioned anyways from the very I think
[23:56]
Steve mentioned it that Um, conservation
[23:59]
is not what we're trying to do here.
[24:01]
We're trying to get away from
[24:03]
conservation by creating satisfactory
[24:05]
storage water that's going to meet our
[24:07]
needs for today's growth as well as
[24:09]
future growth. And that is the end goal.
[24:12]
And so, so we're looking forward to um
[24:15]
moving forward on with phase two. Uh,
[24:17]
and that's what we're here for today to
[24:19]
kind of decide where we're going to go
[24:21]
from here on in. And my my understanding
[24:24]
is is very um clear now as to what's
[24:28]
that u storage is and and as far as the other lakes go. Uh the other lakes
[24:35]
if we were to go for the Highland Lakes
[24:37]
the Mararti and all the rest of it if we
[24:38]
were go them they're still using the
[24:40]
Englishman River as a transportation
[24:42]
main uh as the the delivery system. And
[24:47]
once again, I feel that anything that
[24:48]
comes out of those, once again, the
[24:50]
province is going to say, "Well, we want even more of that." And I'm
[24:54]
afraid that getting a water license to
[24:56]
get out of those other lakes is going to
[24:58]
be the same situation we ran into a so
[25:00]
I'm reluctant to go that gentlemen. I'm
[25:03]
still at at at the point in my mind
[25:05]
after everything I've heard that the
[25:07]
best thing that we can do is capture
[25:10]
that that winter u excess water that uh
[25:14]
falls of rain and precipitation in the
[25:16]
winter and capture that and store it
[25:18]
somehow. You've mentioned some really
[25:21]
good ideas. Give us an idea what kind of
[25:23]
looks like other than expropriating Rath
[25:25]
Trevor Park and putting the reservoir
[25:27]
there, you know, because
[25:28]
>> there we go. We know that size works. uh
[25:31]
turned it into an aqua park instead of a
[25:33]
camping park maybe. Um but uh it gives
[25:37]
me the idea of the size. Um my my
[25:40]
question would be um with after having
[25:42]
talks with Mosaic and so forth, mosaic
[25:45]
lands would be more satisfactory
[25:48]
um to use as side storage mosaic lands
[25:52]
adjacent to the indisman river which is
[25:54]
going to provide the sidream storage
[25:56]
flow if possible. the mosaic lands being
[25:59]
relatively close to us, you know, like
[26:01]
as close to us as possible would be the plan because it's all about
[26:05]
cost, but they have a lot of land like
[26:08]
as you say the size of Brass Harbor. Uh
[26:10]
recently, um the RDN just purchased
[26:13]
Hamilton Marsh. Um how many hectares was
[26:16]
that the council? Do you remember?
[26:18]
>> It was a lot. Yeah. for about $30
[26:20]
million. They purchased it. But um part
[26:23]
of the reason for that uh cost was
[26:25]
because it's uh the land the logging
[26:27]
value of it, the the tree value. And so
[26:30]
but there's a lot of areas that Mosaic
[26:32]
have already logged way closer to us to
[26:35]
our city Lemonson, you know, actually
[26:37]
right where their uh offices are and so
[26:39]
forth that may be more palatable to
[26:42]
putting in storage reservoirs where they
[26:44]
could take advantage of the side stream.
[26:46]
So what I would like my preference at
[26:49]
this point is to evaluate silicide
[26:52]
stream storage options and maybe not in just one reservoir but using it would
[26:56]
have to be mosaic lands as the first
[26:58]
suggestion uh adjacent to us and and is
[27:02]
one reservoir in or or do we use
[27:04]
multiples? Do we use you know 1 2 3 4
[27:07]
you know with the overflow going to uh
[27:09]
it gets the cost down apparently by
[27:12]
instead of making one huge one the size
[27:14]
of raster park. Um but at the same time
[27:16]
it it it and gives um better um failure
[27:20]
against um uh
[27:23]
preventing failure of one of one of the
[27:25]
reservoirs I think you have the backups
[27:26]
as well. I would like that to be
[27:29]
explored anyway. So what that would look
[27:31]
like, what that and how adjacent to it.
[27:33]
And once again, um that as well as the
[27:37]
other option of
[27:39]
what would it take to uh purchase land
[27:42]
within uh the industrial park that we
[27:44]
already looked at. So we already own
[27:46]
some land in there. There's other pieces
[27:47]
of land. They're up for sale type of
[27:49]
thing. Is there an advantage to that?
[27:51]
And what is it? if we actually uh deepen
[27:53]
the excavation in that area type of
[27:55]
thing. If we have to buy a few bundles
[27:58]
of property, you know, five and 10
[27:59]
million dollars each, you know, that
[28:00]
that's a lot better than getting it from
[28:02]
the highlands up on top. That is my hope
[28:05]
that we could have in the this next
[28:07]
phase is considering those two as well
[28:11]
as um checking out the possibilities of
[28:15]
um um subsurface wealth so far. I know
[28:19]
um Greg you mentioned anyways that
[28:20]
you're a surface water hydraologist and
[28:22]
I appreciate that. Um but just consider
[28:25]
those other acryers that you they may
[28:27]
provide some some additional uh flow at
[28:30]
the same time which could either be put
[28:32]
uh piped to the ERWS or you know into a
[28:35]
storage system as well. So that was my
[28:38]
two thoughts that I hope that you could
[28:41]
do and and I understand everything that
[28:43]
you've done in the first phase was all
[28:45]
about the data. you've done an amazing
[28:48]
job on that.
[28:49]
given all the data what we have and
[28:51]
where it comes from and actually you
[28:53]
know express that very well but we also
[28:56]
know that we will need more storage
[28:58]
water and the reason I keep on saying I
[29:00]
want storage water from the sides
[29:02]
streaming storage is because
[29:05]
unlike the wells this doesn't affect
[29:08]
other areas
[29:10]
around us their acryer if we're just
[29:13]
taking the winter rains and so forth
[29:14]
we're not affecting the acryers if we if
[29:17]
we overuse or drill more wells type of
[29:19]
thing. Our drilling of those wells could
[29:21]
actually impact our neighbors and that
[29:23]
is not a good neighbor policy in my
[29:26]
mind. And so I think that the sid stream
[29:29]
has all the benefits. The water's there.
[29:30]
We just have to learn how to capture.
[29:32]
So, I also sub subscribe to Water Canada
[29:36]
the magazine because I'm kind of a water
[29:40]
a nerd and so um uh w with that in mind
[29:44]
I know that there's very options across
[29:46]
Canada and so forth that have been
[29:47]
implemented uh other ways of capturing
[29:50]
water or stored or reservoir water if
[29:54]
that those other options you know maybe
[29:56]
borrow some ideas from everyone else
[29:57]
that would be good if we could look at
[29:59]
that same time.
[30:00]
>> Yeah. Anyhow, that's just my comments. I
[30:02]
going to let let it open the floor. That
[30:04]
that's so so that kind of sums up where
[30:06]
I would hope phase two goes. Um,
[30:09]
everything else that you're suggesting,
[30:10]
I say just stop until we get that done
[30:13]
first. Uh, and no pressure, guys, but we
[30:16]
don't have a long time left on our term.
[30:19]
>> No pressure. Uh, but at the same time,
[30:22]
um, I'm just your comments on that. Is
[30:24]
that something that is doable or or or
[30:26]
is there any more clarification you
[30:28]
need? what I I was hoping to get or
[30:32]
>> um no I think that it's clear I think
[30:34]
yeah so it definitely in terms of
[30:36]
looking at it as a phased approach or
[30:39]
options um is is something to to look
[30:42]
into
[30:42]
>> and and that's exactly you you came up
[30:44]
with the term musling as a phased
[30:46]
approach first phase is create this one
[30:49]
the second phase we create the next one
[30:51]
which will give us that um that
[30:53]
sufficient storage but it's going to be
[30:55]
done over phase period type of thing
[30:56]
because um that's the best way to do it
[30:58]
anyways is that um with any any major
[31:01]
project like this.
[31:02]
>> Yeah.
[31:02]
>> So, yeah, I appreciate that that intent.
[31:05]
Yeah. Thank you. Um
[31:08]
council,
[31:10]
>> first up, uh Council Gren, you reaching
[31:13]
for your mic? You want to go? I don't
[31:15]
know. I'm just guessing. Unless you want
[31:17]
to call a coffee break.
[31:18]
>> Yeah. Yeah. I think I've had too much
[31:20]
coffee.
[31:22]
>> Sure. I'll go ahead. Yeah. Thank you. Uh
[31:25]
thank you, Mr. Mayor. and through you to
[31:27]
our delegation. Thank you very much for
[31:30]
all the work and thanks for coming back
[31:31]
today for this uh committee the whole. I
[31:33]
hope that there's an opportunity for a
[31:34]
bit more of a kind of free conversation
[31:37]
in this format. So feel free to treat it
[31:39]
that way. I think if um if you have
[31:41]
anything you want to jump in on or add
[31:43]
to the the conversation. Um so yeah,
[31:47]
thank you very comprehensive report and
[31:48]
I appreciate the update uh on this. Um,
[31:52]
in terms of I guess maybe I have a lot
[31:55]
of questions around everything, but
[31:57]
maybe I'll just start with kind of the
[31:59]
overarching um question, which is kind
[32:02]
of the goal of this meeting is what
[32:04]
would you see as being um
[32:08]
the the best way to structure a second
[32:11]
phase of this process to get the best
[32:13]
value out of that uh process? uh the
[32:17]
first phase seems to me to and I think
[32:20]
this is what you're speaking about look
[32:22]
at uh what's a single source that we can
[32:26]
use to make up for the the demand and
[32:29]
the the reliability that we're
[32:30]
targeting. Um but there's also
[32:33]
conversation about maybe multiple
[32:35]
approaches uh to to hit that reliability
[32:38]
instead of a single. So with that
[32:41]
context, what would you say would you
[32:43]
would recommend having now done the
[32:45]
first phase for us to get the best value
[32:47]
of the second phase?
[32:53]
» Thanks again. That's it's good to be
[32:56]
here. Um uh so there's two parts of that
[33:01]
um that sort of in in sort of
[33:03]
conversations internally and
[33:04]
conversations with staff. Um the first
[33:07]
is the technical side. So the first is
[33:09]
looking at okay what are are kind of
[33:12]
come up with sort of do the assessment
[33:14]
again in terms of come up with a long
[33:16]
list of potential combinations of those
[33:18]
options and and and and potentially some
[33:21]
others um and look at what are some
[33:26]
options to move forward on a phased
[33:28]
approach. So that's part of it and then
[33:30]
the other part is to start an an
[33:33]
engagement process
[33:35]
with um other interested parties um
[33:40]
around
[33:42]
the discussion around okay there is the
[33:44]
cost but there are other there are other
[33:47]
values to be measured or to understand
[33:49]
in terms of the location. What are some
[33:52]
potentially environmental impacts? um
[33:55]
just to be able to work um
[33:58]
collaboratively
[34:00]
in coming up with that selection. Yes,
[34:01]
there's the technical side. There's sort
[34:04]
of in terms of technical feasibility,
[34:05]
but there are the other um there are the
[34:07]
other components that would also need to
[34:10]
be considered as part of that process.
[34:13]
And having um the other interested
[34:16]
parties involved in those conversations
[34:18]
would be important at this stage because
[34:20]
there may be some that are just they may
[34:22]
be a technical solution, but maybe
[34:23]
there's an a non-starter because of
[34:26]
other other situations. So, that could
[34:29]
just drop off the table right away.
[34:31]
Maybe teasing into the values question
[34:33]
there is uh one of the uh maybe one of
[34:38]
the overarching values is to what extent
[34:40]
do we need to provide uh water for
[34:43]
outdoor use? Um and at what point in the
[34:48]
decades moving forward
[34:51]
do we hit a point where the the uh
[34:53]
indoor use is actually now kind of at
[34:56]
risk. Um my understanding from the
[34:59]
report is that there's no current
[35:01]
concern around indoor and firefighting
[35:03]
and sort of those normal uses. It's just
[35:05]
in the peak times when you have 72% of
[35:08]
the the water being used for outdoor uh
[35:12]
that's where we run into the issue. But
[35:13]
there is a value about and this is I
[35:15]
think shifting culturally as well is you
[35:17]
know do we water our lawns? Um,
[35:20]
obviously we still want to water um, you
[35:23]
know, gardens and all that sort of
[35:24]
thing, but the lawns themselves um, is
[35:27]
something that I think culturally is
[35:29]
changing that people aren't having the
[35:30]
same expectations around having a like a
[35:33]
golf course style lawn in front of your
[35:34]
house. Um, so maybe there's a question
[35:38]
in there which is at what point do we
[35:40]
kind of hit a point where we're now
[35:44]
uh risking not having enough indoor use
[35:46]
water? And uh and then I I know you
[35:50]
can't probably answer the value question
[35:51]
about how much we should be putting
[35:53]
towards lawns, but yeah.
[35:56]
Um yeah so on the first part of the
[35:58]
question um in terms of when that's not
[36:01]
something sort of specifically that
[36:03]
looked at but um generally
[36:07]
the and now this is the total demand. Um
[36:11]
so generally about 2third of the total
[36:13]
annual demand is used through the
[36:16]
summertime. So if you can kind of reduce
[36:18]
that down that's like that is fairly
[36:20]
significant component of of the water um
[36:23]
that total volume and and that was
[36:25]
discussed and addressed to some extent
[36:27]
in the report with regards to
[36:28]
conservation measures um and and uh
[36:32]
providing some uh recommendations on
[36:37]
uh different programs and and potential
[36:41]
uh projects to look at at water
[36:43]
conservation and and that does make a
[36:46]
Right. So you can there there are a
[36:47]
couple of graphs in the report that show
[36:49]
sort of a reduction in the demand and
[36:50]
then a slow increase as the uh with with growth. Um so there isn't there
[36:56]
wasn't sort of a specific in terms of
[36:58]
that that background um what the uh the
[37:03]
future is but it was it was beyond what
[37:06]
the uh the planning horizon was for the
[37:09]
study which was the 50-year period.
[37:12]
Yeah.
[37:20]
Are you?
[37:22]
>> Yeah. Okay. Councelor Gor, go ahead sir.
[37:23]
>> Yes. Thank you, mayor. [clears throat]
[37:25]
Thank you uh for the presentation and uh
[37:27]
very uh detailed report. Uh good to have
[37:31]
those options I think explicitly
[37:33]
expressed now in this meeting. Um my
[37:36]
question is about the methodology. Um
[37:39]
when you gave us all those different
[37:41]
options about potential sources, what
[37:44]
sort of methodology was used to come up
[37:46]
with those costs and the feasibility of
[37:48]
those sources? Was it just uh review of
[37:51]
the previous studies or any satellite
[37:54]
imagery? Like I just want to make sure
[37:57]
we are we are making the most informed
[37:59]
decision when we choose one of those
[38:00]
sources. So if you can speak to the
[38:02]
methodology please. Thank you.
[38:03]
>> Yeah. No, of course. Uh so it was a
[38:05]
combination. Um we reviewed the previous
[38:08]
studies um and and those identified
[38:11]
those areas. We also looked at the
[38:14]
topography um with regards to um a
[38:20]
uh where where in the watershed are
[38:23]
there locations where for that sort of
[38:25]
that incremental height of a dam, how
[38:28]
much storage can you get? and and it
[38:31]
that that assessment came out to kind of
[38:34]
the same locations as as previously.
[38:36]
There are there are so many sites within
[38:39]
the area that that within the watershed
[38:41]
that have that combination of the right
[38:44]
topography and normally normally it's a
[38:47]
lake. So, so if you think about sort of
[38:49]
a it it's sort of the difference between
[38:53]
storing volume in a triangle versus
[38:55]
storing volume in a square, right? So,
[38:57]
for the same amount of of Yeah.
[39:00]
So just to clarify, did that include
[39:02]
like field trips? You went there
[39:04]
actually to
[39:05]
>> No. Okay. There was Yeah. Yeah. There
[39:06]
were no there was no field investigation
[39:08]
as part of this this study. The only the
[39:11]
field trip that we did do was up to the
[39:13]
existing the existing dam.
[39:14]
>> Okay.
[39:15]
>> I have one uh more question. Thank you.
[39:18]
Um you spoke about the Aerosmith Dam and
[39:20]
the possibility of raising it. Uh uh our
[39:23]
current deficit is 2.2 million cubic. it
[39:25]
will give us about two uh better than
[39:29]
nothing and I think uh in the staff
[39:31]
report it mentions that staff recommends
[39:34]
looking at this uh as an option. Um I
[39:37]
personally do like it as a phased
[39:39]
approach uh strategy is already there uh
[39:42]
for us to explore this as an option. Um,
[39:45]
can you speak to a little bit on the
[39:47]
timeline if we were to start working on
[39:49]
raising the dam? What sort of timeline
[39:51]
are we looking at in getting those
[39:53]
additional two cubic 2 million cubic
[39:55]
meters of water? Thank you.
[39:56]
>> Yeah. Um, so there's a couple of
[39:58]
components to the timeline. Um, one is
[40:01]
the the design side and then the second
[40:04]
is the regulatory permitting because it
[40:06]
would require a change to the water
[40:08]
license. And so in terms of timing, it's
[40:11]
it wouldn't be so a new source is
[40:14]
probably in the 10-year kind of range to get a new source online. I would say
[40:20]
an upgrade would be probably half of
[40:23]
that. So yeah, in that sort of range.
[40:27]
>> Thanks. And since we're in committee,
[40:30]
>> yeah, that's sort of after the decisions
[40:32]
been been made to to move forward with
[40:34]
that option would be sort of in that
[40:36]
kind of timeline. Yeah.
[40:38]
>> Right. and and councelor Gorgan as Craig
[40:40]
had mentioned anyways the raising of the
[40:42]
Aerrol Smith Dam would have limited um
[40:45]
value in my mind in my opinion because
[40:47]
of what Craig said about it's such a
[40:49]
small amount of catchment in it be
[40:52]
because it the watershed that would
[40:54]
supply that in fact our existing dam
[40:57]
that we have now does not always fill
[41:00]
right now during the winter months we've
[41:02]
had times when it's not been that
[41:04]
spillover and climate change is changing
[41:07]
a lot of tanks and that is included. So
[41:09]
even if we add um build up the walls
[41:12]
another 30 ft, there's no guarantee that
[41:14]
nature is going to actually fill that
[41:15]
during the winter. So if you c if you
[41:18]
can't capture it as it's such a small
[41:20]
area if you have some rainfall spread
[41:23]
over the whole wershed obviously that's
[41:25]
what the English river does and collects
[41:26]
all that but at the same time that it's
[41:29]
you you've been up the dam I think
[41:30]
haven't you see it's such a a tiny
[41:32]
little cone. So there's no guarantee
[41:34]
about that. That's just my comments on
[41:36]
that. That's why I'm a little reluctant
[41:37]
on that. Um, Councelor Martin, go ahead.
[41:43]
>> Thank you, Mr. Mayor, and I I thank you
[41:46]
for the reports there. Um, I was hoping
[41:49]
I would have more decisions to be able
[41:51]
to make, you know, too many options
[41:53]
here, and the phased approach would
[41:55]
probably be the most practical, but um,
[41:59]
what about one of the lakes going into
[42:02]
the dam like using one of the lakes?
[42:04]
It's part of what your study has been.
[42:07]
So the cost of that raising the dam is
[42:11]
that a fiveyear would would be 10 years
[42:13]
too like like you just mentioned.
[42:17]
Would it would that work? I mean what I find really hard is I'm I was in
[42:22]
Victoria when we had a water problem. I
[42:23]
don't know if mentioned and they raised
[42:26]
their dam and they have more water than
[42:28]
they'll ever need now. And so I find
[42:30]
this
[42:32]
seems to be such a simple thing but it's
[42:34]
not.
[42:35]
So is it is it quite different than what
[42:38]
happened in Victoria there Dan?
[42:40]
>> Yeah thanks council Martin. Um yeah
[42:42]
there's so it the the main um driver is
[42:49]
there are two there are two pieces when
[42:51]
you're looking at water surface water
[42:52]
supply that you need to consider. One is
[42:55]
how much water on an annual basis is
[42:57]
there that's coming off. And that's to
[42:59]
be able to provide flow throughout the
[43:03]
year um both for the community and for
[43:05]
environmental flow needs as well as be
[43:08]
able to refill the storage that you've
[43:10]
depleted the year before. for um for
[43:15]
the CRD system um down in Victoria, the
[43:19]
greater Victoria Water Supply system. Um
[43:22]
their wershed in terms of a ratio is
[43:24]
significantly more is significantly
[43:26]
bigger um with the ratio of the amount
[43:29]
of water that's available in the wershed
[43:31]
to this amount of storage because the
[43:33]
wershed is quite a bit bigger. Um the
[43:36]
other piece with the Victoria system is
[43:39]
um they do have that it's not been
[43:42]
implemented yet, but there is a future
[43:44]
potential implementation of the Leech
[43:45]
River system to be able to bring
[43:47]
additional water in. Um,
[43:51]
going back to the first part of your
[43:53]
question around the uh other lakes
[43:57]
upstream of of Aerosmith,
[44:00]
it's because it's all coming from the
[44:03]
same watershed.
[44:05]
It's it's you you need to whether that's
[44:07]
storage is being filled at the
[44:09]
downstream end where the dam is or
[44:12]
further upstream, it's all coming from
[44:14]
the same location. So you it's even
[44:17]
though you could split that storage up
[44:20]
over a couple of different locations
[44:22]
because the overall wershed isn't
[44:23]
supplying sufficient water to refill the
[44:26]
storage currently. It it wouldn't
[44:28]
provide enough to fill up two stoages in
[44:30]
the same wershed. You could look at it
[44:32]
at a separate whed like the fish tail as
[44:35]
an example. Um, but because it's all
[44:38]
coming from the same watershed, it's it
[44:40]
it's uh it wouldn't be able to fill up
[44:42]
both both of the the stoages. Yeah.
[44:47]
>> Good. Good. Counc. Go ahead, sir.
[44:52]
>> Thank you through the mayor to our
[44:53]
delegation. Uh, in your presentation
[44:55]
here, you mentioned Oquer 216. Uh but I
[44:59]
in your report it was off for 221 that
[45:02]
you guys were speaking about as uh the
[45:05]
potential to there. So uh I guess why
[45:08]
the shift from like why the focus on 216
[45:10]
here and not mentioning 221.
[45:13]
>> Yeah.
[45:13]
>> But and also uh isn't 221 known
[45:16]
vulnerable aquifer as it is now? Um you
[45:20]
talk about groundwater like being only
[45:22]
you know potential uh supplement there
[45:24]
too. But um yeah anyways why Hagum 221
[45:29]
is not mentioned here but it was one of
[45:30]
the key findings in your report.
[45:32]
>> Yeah um did you want to speak to it? Uh
[45:36]
yeah.
[45:37]
>> Yeah. The um we did look at um both
[45:40]
aquifers. Aquifer 221 if we could do you
[45:43]
mind pulling up that slide with the uh
[45:47]
um aquifer 221 is there is a system sand
[45:51]
periel I think that draws from that
[45:53]
aquifer and it is closer to uh to the
[45:57]
ocean. Uh so further study would be
[46:00]
needed to to figure out um what further
[46:04]
water could be drawn from there. I think
[46:06]
here the reference to um acquer 216 is
[46:10]
your current aquifer where where again
[46:12]
there's um potential for for a small
[46:18]
amount to be drawn from that as well. uh
[46:20]
just further study is needed in terms of
[46:23]
a groundwater numerical model which uh the regional district of
[46:27]
Nanaimo has has has done some of that
[46:30]
work in the past but it hasn't been done
[46:32]
in the context of the city's supply and withdrawal specifically.
[46:40]
» Okay.
[46:41]
Um and then also it seemed like uh
[46:45]
Shelton and Healey Lake were some you
[46:47]
know primary uh sources that have been
[46:50]
identified in the past too. What's your
[46:52]
guys' opinion then on the the potential
[46:54]
out of there and and you know I guess
[46:56]
like why haven't they been highlighted
[46:58]
as more as like the you know we're
[47:00]
looking for some kind of clear direction
[47:01]
as saying like this is your best option
[47:04]
uh for not just um the value but for you
[47:08]
know if you look at a lifetime as uh
[47:10]
councelor Gren mentioned like looking uh
[47:12]
forward ahead in in generations here uh
[47:15]
would this not be the one to benefit us
[47:18]
long term uh you know I don't want to
[47:20]
see us take a position of going, let's
[47:22]
do something that's of good value,
[47:23]
meaning just cheap for us now, but then
[47:26]
in 20 years we go, oh, like we we should
[47:29]
have gone with the, you know, the more
[47:31]
robust system because now we just made
[47:33]
it harder for ourselves later on. We
[47:34]
already spent a whole whack of money and
[47:36]
now it's more expensive to do what we
[47:38]
should have done in the first place. So
[47:39]
you know when I think about value it's
[47:41]
the long term not just what you know
[47:42]
this uh this council or the next council
[47:45]
will be uh having a face for the
[47:47]
taxpayers but you know the residents in
[47:49]
20 years what's the the you know the
[47:52]
value over the lifetime.
[47:55]
Yeah. Um yeah thanks councelor presence.
[47:59]
Um so there's uh for for Shelton and
[48:02]
Healey um there have been they they have
[48:05]
been identified previously as as
[48:07]
potential um options as you'd mentioned.
[48:10]
Um so there were in addition to the cost
[48:14]
um there were some other considerations
[48:16]
uh for that that may kind of at the
[48:20]
level of the analysis that was done to
[48:22]
sort of provide clear direction. the um
[48:26]
there was so for Shelton it's similar to
[48:30]
Aerosmith in that the watershed area is
[48:32]
relatively small and so the ability to
[48:35]
refill storage in that location is is
[48:37]
limited.
[48:39]
The um Healey is downstream. It has
[48:41]
quite a larger a larger watershed area
[48:44]
which is h which is helpful in terms of
[48:47]
refilling. Um but um there could
[48:51]
potentially be some environmental um
[48:53]
considerations. It's more of a wetland
[48:56]
than a lake. Um and so there might there
[48:58]
could potentially be um species at risk
[49:01]
or other considerations that would need
[49:02]
to be considered as part of permitting.
[49:04]
So there's a bit more of a permitting
[49:05]
risk, an environmental risk on that one.
[49:08]
And then the other piece for both is the
[49:10]
amount of storage that's required is it
[49:12]
would be more um because there would be
[49:15]
a requirement to release because the
[49:18]
waters coming from the south Englishman
[49:19]
river wershed there would be an
[49:21]
additional requirement to supply
[49:23]
environmental flow needs for the
[49:25]
southishment. Um so the amount of
[49:27]
storage that's why the storage numbers
[49:29]
for those are higher than than fishtail
[49:31]
is because there would be a supplemental
[49:33]
need to supply um additional flow along
[49:37]
the along the south Englishman. Um so
[49:40]
even though they um they might they
[49:44]
they're from a from a technical
[49:46]
perspective and a cost perspective
[49:48]
they're they're they seem to be high on
[49:50]
the list because of those other
[49:51]
considerations. um they kind of balanced
[49:54]
off with the other with the other
[49:56]
options like fishtail or or the South
[49:58]
Englishman tributary. The um fishtail
[50:03]
um has a smaller volume requirement
[50:07]
because it's it's feeding directly into
[50:09]
the Englishman. So it would essentially
[50:11]
supplement the existing environmental
[50:12]
flow need requirements for for the the Englishman River, the main stem of
[50:17]
the Englishman River. um as well at but
[50:20]
one of the challenges with Fishtail was
[50:22]
more on the technical side is is access.
[50:24]
Um it's it's it's a very it would be a
[50:27]
difficult site to get to. Um so sort of
[50:29]
those trade-offs and it was it we sort
[50:32]
of that's why we went through that
[50:33]
process and in the end there were
[50:35]
several that kind of came out close and
[50:37]
so there'd need to be kind of more
[50:38]
evaluation. There wasn't sort of a clear
[50:41]
front runner after doing that analysis.
[50:43]
So yeah.
[50:45]
>> Go ahead.
[50:46]
Um
[50:48]
Sorry. Thank you. Um, so speaking of the
[50:50]
Fishtail area as well, there is that
[50:52]
small lake uh between Aerosmith Dam and
[50:54]
Fishtail, Hidden Lake, I believe it's
[50:56]
called. Uh, why no mention about, you
[50:59]
know, draining that one into uh the
[51:02]
Aerosmith Dam. Seems that it it seems
[51:04]
like the access is it's on the same side
[51:06]
of the ridge. There's already a road
[51:08]
that's going right up to it. It's right
[51:09]
above Aerosmith. It seems like you could
[51:11]
just put a line in a tap and then you
[51:14]
know I know it's not a lot of volume but
[51:16]
um when you talk about if the dam's not
[51:18]
spilling over you know if you're
[51:20]
supplementing even 20% out of it that's quite a bit more water that's not
[51:24]
being utilized right now. Um is that an
[51:27]
option or or why has that not been
[51:29]
discussed as like here's a little bit
[51:31]
more low hanging fruit to get more water
[51:33]
to the dam?
[51:35]
>> Yeah. So um sort of similar it um so a
[51:39]
hidden lake flows into Aerosmith as as
[51:42]
you indicated and because it's within
[51:45]
the same watershed
[51:47]
um whether whether that's stored at the
[51:51]
existing location or at Hidden Lake,
[51:54]
it's all coming from the same volume of
[51:56]
water. Um, and so essentially your your
[52:01]
the volume that you would require to
[52:03]
fill up Hidden Lake is now not going to
[52:06]
clear Smith water.
[52:07]
>> So it's already draining into the dam.
[52:08]
>> It's already draining into the dam
[52:10]
already. So So capturing it further
[52:13]
upstream.
[52:14]
>> Um,
[52:16]
it's not providing a benefit.
[52:17]
>> If it's already draining into it, then
[52:19]
that that Yeah, it's a good point at
[52:21]
that point. I just to me it just seemed
[52:23]
like it sits there and just evaporates
[52:25]
and and doesn't uh do anything. So
[52:27]
because you have water up there in
[52:29]
August as well as sitting up there and
[52:31]
our dam's going low and there's still
[52:32]
water in Hidden Lake. So I just thought
[52:34]
why would we keep water up in there? Why
[52:35]
not put all into the dam into the same
[52:38]
source?
[52:39]
>> Um okay, thank you for that. Appreciate
[52:41]
[clears throat] that.
[52:46]
» Uh
[52:47]
councelor
[52:50]
certly go ahead.
[52:51]
>> Thank you Mr. mayor and thank you very
[52:53]
much for the presentation and the update
[52:55]
and the information. I really appreciate
[52:57]
it. I have a and I wanted to focus the
[53:00]
questions on this particular topic and
[53:03]
leave the aquifer and groundwater uh
[53:06]
conservation separately. Um, I was
[53:09]
curious first of all, and forgive me
[53:11]
everybody here who already knows this,
[53:13]
but I don't recall if the South
[53:16]
Englishman River flows into uh the
[53:19]
Englishman above or below the clay
[53:22]
banks. Can you answer that? Can somebody
[53:25]
here answer that?
[53:27]
>> I Yeah. Um, yeah, my understanding is
[53:31]
it's above it flows in above the clay.
[53:34]
>> That's what I was afraid of. That's what
[53:35]
I thought. But I was thinking, oh, I
[53:36]
just haven't been up there recently, so
[53:38]
I couldn't recall. Okay. I just thought
[53:40]
that would eliminate a little bit of a,
[53:42]
you know, an area of some friction,
[53:45]
let's say, regarding water treatment
[53:47]
plant. But my questions are also about
[53:50]
uh Shelton and Healey and and the
[53:52]
information you've given has helped a
[53:53]
bit with that. But um presumably this
[53:57]
they would not be combined in a way as a
[54:00]
phrase approach but that if one went
[54:02]
with Healey that is basically drawing
[54:04]
from Shelton as well as it feeds into
[54:06]
Healey would that be correct. So in fact
[54:09]
uh if we if one looked at um Healey then
[54:14]
that is drawing on that whole area
[54:17]
correct okay thank you. And another
[54:20]
question again for clarification.
[54:22]
Um you know hearing the mayor speak uh
[54:25]
and yourself speak about the sidestream
[54:28]
storage. Um
[54:31]
I I've just I guess I've been a little
[54:33]
bit perplexed like how is that really
[54:35]
different from uh what's being looked at
[54:38]
here in terms of providing a dam and and
[54:41]
gathering an area that is storage that
[54:44]
is then released as needed. and over
[54:47]
time um although perhaps I guess the
[54:50]
spillover part is not necessarily
[54:53]
released sorry utilized for the city but
[54:56]
nonetheless depending on the size of the
[54:58]
dam that actually provides storage. So
[55:01]
is is really the difference in terms of
[55:04]
considering something like that is it
[55:06]
around regulatory
[55:09]
um requirements if I made from the
[55:12]
province or is it around water licenses
[55:14]
or if one had something like sidestream
[55:17]
storage would that not also need some
[55:20]
kind of water license I'm just not
[55:22]
understanding
[55:23]
why one would look at that if we um are
[55:27]
able to provide enough storage of water
[55:30]
with one of the options that you put
[55:32]
forward.
[55:34]
>> Um, yeah. So, I think
[55:38]
so I'll just clarify in terms of your
[55:40]
the first part of your question. Um,
[55:42]
yes. So, for Shelton and Healey, they
[55:44]
were both coming from the same the same
[55:46]
watershed and there could be the
[55:49]
potential of of having so one larger dam
[55:53]
at at Healey or two smaller dams, one at
[55:56]
Shelf and one at Healey. So there are
[55:58]
some potential options there, but again
[56:01]
sort of similar to to Aerosmith, it's
[56:04]
all coming from the same wershed. So you
[56:06]
the total volume that's available is is
[56:08]
the same no matter where you're storing
[56:10]
it. Uh
[56:13]
I'll I'll stick on that side. Um so the
[56:16]
for the the licensing um because it is
[56:21]
in it's new storage um there be a new
[56:24]
dam there would be a requirement for a
[56:27]
license a new license for the structure
[56:30]
and
[56:32]
the license needs to define both what
[56:35]
the location the volume and the use the
[56:38]
intended use. Um and so in this
[56:40]
particular case it would be there would
[56:43]
be a component of it for uh the
[56:45]
community um demand and withdrawal and
[56:49]
the other component of it would be for
[56:51]
storage to supplement flows in the south
[56:54]
Englishman river. Um because the storage
[56:57]
is located on the south Englishman there
[57:00]
would be an expectation that there would
[57:02]
be additional flows provided on top of
[57:05]
what's required for the community. So
[57:07]
that's why there's more storage. the um
[57:10]
for the
[57:13]
and and the main reason for that is
[57:15]
because you'd be releasing the flow and
[57:17]
during the summer period when the flows
[57:19]
are low, when the base flows are low and
[57:22]
um the the for the east coast of the
[57:25]
island, um essentially the the policy is
[57:28]
that you provide you need if you're
[57:30]
withdrawing water during that time, then
[57:33]
you need there's enough storage to be
[57:35]
able to support the withdrawal as well
[57:38]
as an environmental flow need. Um the
[57:43]
for the off channel storage uh the
[57:47]
intent there would be that the water be
[57:49]
withdrawn during the period when there's
[57:51]
higher flow and so
[57:55]
there would there may still be that's
[57:57]
one thing I can't comment on is like
[57:59]
there might still be the need for
[58:00]
additional environmental flow needs
[58:02]
potentially with that. It's it it it
[58:04]
that would need some further discussion
[58:06]
with the regulator on that one. But the
[58:09]
sort of the intent would be that the
[58:11]
water would be withdrawn in the winter
[58:12]
when the flows are higher um and then
[58:14]
stored um in in a um in a location in a pond um that would then be used
[58:23]
through the summer period. the and I
[58:25]
guess from a from a
[58:28]
technical perspective the difference
[58:32]
would be that the pond um an off channel
[58:37]
pond would require you would be
[58:40]
constructing the volume by excavating
[58:43]
and and burming like essentially
[58:46]
creating a dugout a really large dugout
[58:49]
um or a series of dugouts um versus um
[58:54]
using a natural feature um and a dam to
[58:57]
be able to provide the storage. And so
[59:00]
there's sort of it the main differences
[59:03]
are just sort of the the footprint the the incremental footprint of of the
[59:10]
storage area. So if we're looking at say
[59:13]
Shelton for example, um there's already
[59:16]
a lake there. Um, and so you the lake
[59:19]
would be bigger, but it would the the
[59:23]
incremental size of that would be less
[59:25]
than what a a new pond would be. Um, so
[59:28]
that there's there's other
[59:30]
considerations there, too. And so
[59:31]
there's land considerations,
[59:32]
environmental considerations. At the
[59:35]
same time, off channel storage, you
[59:36]
would sort of remove those potential um
[59:40]
potential regulatory. if there was a a a
[59:44]
good location, you could remove some of
[59:46]
the other regulatory environmental
[59:49]
concerns around raising a lake. So,
[59:52]
raising a lake, there are concerns about
[59:54]
how does that affect the the the
[59:56]
riparian area? Um what kind of impact
[59:59]
does that have on the land? Um the land
[1:00:01]
like there's the land owner. Um whereas
[1:00:05]
providing offstream storage, you're
[1:00:07]
eliminating some of that because it's
[1:00:08]
separated from the the riparian zone. Um
[1:00:11]
and uh there could be other terrestrial
[1:00:15]
considerations in terms of changing that
[1:00:17]
habitat from terrestrial to aquatic but
[1:00:21]
um but it but there's a trade-off there.
[1:00:27]
>> You mention sorry also mentioned the
[1:00:30]
potential water quality uh concerns. So
[1:00:33]
would need to be some detailed study on
[1:00:35]
uh on how that would be impacted having
[1:00:38]
storing water and not not having outflow
[1:00:40]
from it or no movement in that water.
[1:00:43]
Yeah,
[1:00:46]
>> Dr. Wood, go ahead.
[1:00:48]
>> Thank you, mayor. Uh I sent a slide to
[1:00:51]
staff. I'm hoping that they got it. I
[1:00:55]
wasn't really planning to speak to this.
[1:00:56]
is um
[1:00:59]
it's with regards to um environmental
[1:01:01]
flow needs. And so, um,
[1:01:05]
in your presentation today, we saw that
[1:01:08]
the flow in the river during the drought
[1:01:11]
periods or the dry season is actually
[1:01:14]
better because there's a dam. And so, I
[1:01:18]
think we have some misconceptions about
[1:01:22]
what the dam means. And yes, there's
[1:01:24]
environmental concerns when we're going
[1:01:26]
to build the dam. We saw a lot of that
[1:01:27]
with site C. you know, you're flooding
[1:01:30]
farmland and you're never going to use
[1:01:31]
that land again, etc., etc. So, where we
[1:01:34]
build the dam, there's definitely
[1:01:35]
environmental concerns, but um I pulled
[1:01:38]
a bunch of data that's public data as to
[1:01:41]
how the river has done since we were
[1:01:43]
pulling the data. And you can see that
[1:01:47]
it was very low uh lower than before the
[1:01:52]
dam. And now the dam actually makes it
[1:01:55]
obviously better um than it was before
[1:01:59]
we were holding water up there. Um you
[1:02:01]
can also I put population growth on here
[1:02:04]
too. And
[1:02:07]
the idea seems to be that if we can flow
[1:02:11]
more water uh from upland, we're
[1:02:15]
actually making it better for the
[1:02:16]
rivers. It's not worse, it is better.
[1:02:18]
the dams make the rivers and you know
[1:02:21]
the environment for the fish better. Um
[1:02:24]
and so I think there's a misconception
[1:02:26]
that um we built the dam and things got
[1:02:30]
worse. You can see by the data that the
[1:02:32]
river used to be much more dry and if we
[1:02:35]
weren't releasing water from the dam
[1:02:36]
right now there'd be a trickle. Um, and
[1:02:39]
so I I just wanted to mention that when
[1:02:41]
we're talking about environmental needs,
[1:02:43]
if there was Shelton or Healey or
[1:02:44]
whatever uh options up there that if we
[1:02:49]
build more upstream water storage and be
[1:02:52]
releasing it, the the lower down on the
[1:02:54]
watershed is healthier, not not worse,
[1:02:58]
because we get to control a little bit
[1:03:00]
and add a little bit more water when
[1:03:03]
there wouldn't have been naturally. Um,
[1:03:05]
I'd love to see us plan for zero
[1:03:07]
snowpack. Uh, if we get years with
[1:03:09]
snowpack, great. With more, you know,
[1:03:12]
that's natural upland water storage is
[1:03:14]
how I kind of look at it. I think I
[1:03:16]
mentioned that to you guys before. Um,
[1:03:17]
but I would love to hear your thoughts
[1:03:19]
on if I'm, you know, if I'm on the right
[1:03:21]
track. This is data looks right to you.
[1:03:24]
know, is that what dams actually do?
[1:03:26]
they make lower on the wershed? Do
[1:03:28]
they make the rivers actually healthier
[1:03:30]
um than they would be naturally?
[1:03:33]
>> Um,
[1:03:35]
yeah. No, thanks Councelor Wood for your
[1:03:37]
question. Um, yeah, so again, um, I'm
[1:03:41]
going to focus on the Englishman. Um,
[1:03:44]
dams as a whole is a is is is a is
[1:03:46]
definitely a broader broader question,
[1:03:48]
but um, for the for the Englishman River
[1:03:50]
specifically, um, yes, like the the the
[1:03:54]
dam has provided storage in the upland
[1:03:57]
that is providing increased flows for
[1:04:01]
almost the entire main stem of the
[1:04:03]
Englishman River. Um and one of the
[1:04:07]
there there are two parts to that. One
[1:04:08]
is it's um it's increasing what the
[1:04:11]
flows were downstream of the intake um
[1:04:15]
to be able to to to provide benefit for
[1:04:18]
that for the intake down to the ocean.
[1:04:21]
Um but the other piece is the water that
[1:04:24]
the community is using is flowing all
[1:04:27]
the way down the river before it's
[1:04:29]
getting withdrawn. And that water is
[1:04:32]
also benefiting upstream. Um
[1:04:36]
uh by like alternatively when the dam
[1:04:39]
was constructed there could have been a
[1:04:41]
pipeline that was constructed all the
[1:04:43]
way down from the dam to the community
[1:04:45]
and that water wouldn't have gone into
[1:04:46]
the river. So there's so there's a
[1:04:48]
benefit. It's a it's a co- benefit. So
[1:04:50]
there's a benefit to the community and a
[1:04:52]
benefit to the river. Um and yeah and so
[1:04:55]
for Shelton and Healey there would be
[1:04:58]
that benefit to then the South
[1:05:01]
Englishman as well. Um but that would
[1:05:03]
need to be looked at and offset against
[1:05:06]
what are some of the concerns around
[1:05:07]
raising the water level in the lake. Um
[1:05:10]
and and and that tradeoff it's it's it's
[1:05:14]
about considering those trade-offs.
[1:05:15]
Yeah.
[1:05:17]
Can I sorry I add to that council we're
[1:05:19]
just in regard to the um a new project
[1:05:22]
also there there could be bene uh there
[1:05:24]
obviously we're talking about benefits
[1:05:25]
the environment there could be
[1:05:26]
opportunity to seek funding from other
[1:05:29]
uh sources too where uh environmental
[1:05:33]
agencies are such that to promote that
[1:05:37]
uh water usage downstream for uh for the
[1:05:40]
environment.
[1:05:42]
>> Yeah. So if there's that co- benefit of
[1:05:44]
an environmental benefit and a community
[1:05:46]
benefit, there could be some additional
[1:05:49]
um potential funding sources if it's
[1:05:51]
provide if it's showing that it's
[1:05:52]
providing benefit for for habitat for
[1:05:55]
aquatic habitat. And then you know my
[1:05:57]
followup and I don't know how the
[1:05:59]
regulators operate but um if I were a
[1:06:02]
regulator I would be balancing the
[1:06:04]
environmental concerns of you know
[1:06:06]
raising the level of the lake and what
[1:06:08]
happens way upstream uh versus the
[1:06:10]
obvious benefits to the river fish
[1:06:14]
habitat etc downstream. Um, and if the
[1:06:18]
feds and the province want us to build
[1:06:20]
more housing, well, you know, obviously
[1:06:23]
water supply is part of our
[1:06:25]
infrastructure that we provide here. And
[1:06:27]
so if I were a regulator, I'd be like,
[1:06:29]
yeah, you know, the water level is going
[1:06:30]
to go up at whatever, you know, location
[1:06:33]
we choose. Um, but the benefits far
[1:06:37]
outweigh for the environmental flow
[1:06:39]
needs, uh, for the community. They they
[1:06:41]
far outweigh that. And so I don't know
[1:06:43]
how regulators, who is that? I don't
[1:06:45]
know how they typically operate and
[1:06:48]
maybe you guys as engineers maybe maybe
[1:06:50]
you could shed some light on what they
[1:06:51]
look at when they when they are
[1:06:53]
balancing these decisions.
[1:06:54]
>> Um yeah so so there are um really
[1:07:01]
sort of three areas I guess broadly that
[1:07:04]
the regulators looking at on the water
[1:07:06]
licensing side anyway. Um so one is the
[1:07:10]
first is is there enough water
[1:07:13]
technically? Um the second is does would
[1:07:18]
issuing the license impact um any of the
[1:07:23]
rights holders. So that's um property
[1:07:27]
rights, other water rights holders, uh First Nations, land title, um and
[1:07:34]
then and making sure there's because the
[1:07:35]
province needs to consult and and with First Nations. So there's there
[1:07:39]
there's a First Nations um component to
[1:07:42]
the question in terms of making sure
[1:07:44]
that that the community is on board with
[1:07:46]
what the direction is. Um and then uh
[1:07:50]
there's and then there's also the
[1:07:52]
environmental component. Um and to some
[1:07:56]
extent the social component as well. Um
[1:07:58]
so there there's usually a development
[1:08:01]
plan that's prepared that by the by the
[1:08:04]
proponent. So whoever's applying for the
[1:08:08]
license needs to put together a document
[1:08:10]
that kind of outlines the benefits and
[1:08:12]
the costs of each of those components.
[1:08:14]
Um and and then it's up to the regulator
[1:08:17]
to go either um yes like the the I I
[1:08:22]
concur that overall for those different
[1:08:26]
components that the benefit is to issue
[1:08:28]
the license or no it's not or there's
[1:08:32]
the middle of need more information
[1:08:35]
right and so that's essentially the
[1:08:36]
process for the licensing and then on
[1:08:39]
the on the DFO side um it's really more
[1:08:42]
focused on the The main sort of test is
[1:08:46]
are the actions being taken? Are they um
[1:08:51]
altering
[1:08:52]
um or destroying fish habitat? So that's
[1:08:55]
their test um in terms of issuing a a a
[1:08:59]
license under the under the Fisheries
[1:09:01]
Act. So they're really focused like
[1:09:03]
their their focus is really on the
[1:09:05]
aquatic habitat um and are the actions
[1:09:08]
being taken are they going to impact um
[1:09:11]
and like either alter or destroy habitat
[1:09:14]
in any way. Um
[1:09:16]
>> yeah,
[1:09:16]
>> thank you very much for answering those.
[1:09:18]
And to your last point, yeah, I don't
[1:09:19]
I'm not a biologist, so I don't
[1:09:21]
understand like if we're actually adding
[1:09:23]
more water to the habitat than would
[1:09:25]
naturally be there. So, I don't I don't
[1:09:27]
quite understand the environmental flow
[1:09:29]
needs, which are higher than
[1:09:31]
historically what it would be. Uh, but
[1:09:33]
thank you for answering those and thank
[1:09:35]
you to staff for um throwing that slide
[1:09:37]
up. Thanks, Mayor.
[1:09:38]
>> Great. Thank you. I I'll just uh throw
[1:09:43]
in just a comment. Anyways, um just
[1:09:45]
spitballing here. Um I hung around in
[1:09:48]
Calgary a little while and my use and so
[1:09:51]
forth. What is the use of for the
[1:09:52]
Glenmore Dam? Are you familiar with the
[1:09:54]
Glenmore Dam? It's right in the middle
[1:09:56]
of Calgary. Well, Calgary is growing all
[1:09:58]
around the Glenmore and Heritage Park is
[1:10:00]
right beside there, the huge subdivision
[1:10:02]
and so forth. But are you familiar with
[1:10:03]
the Glenmore? Is it is it actually flood
[1:10:06]
control like all the problems they've
[1:10:07]
had in Calgary and the flood control,
[1:10:09]
but are they actually using it as a
[1:10:11]
storage for their potable water?
[1:10:13]
>> Um, yeah. So, my under I know a little
[1:10:16]
bit about it, so I'm going to qualify
[1:10:18]
that, right? But I think my
[1:10:19]
understanding is is it's twofold. Um so
[1:10:22]
there there is some um uh storage for
[1:10:26]
flood control to some extent and then
[1:10:29]
also like my understanding is they do
[1:10:31]
use Glenmore as as one of their water
[1:10:33]
supplies.
[1:10:34]
>> Right. Yeah. Yeah. It it that's one of
[1:10:36]
those like as we say a phased let's put
[1:10:39]
a reservoir here because we have the
[1:10:41]
land here and it's right adjacent to
[1:10:43]
probably the B river anyways are right
[1:10:45]
there. So yeah,
[1:10:46]
>> um good planning
[1:10:47]
>> and yeah and I know like relatively
[1:10:50]
recently my understanding is they've
[1:10:53]
also provided some additional flood
[1:10:54]
relief um through a new system that that
[1:10:57]
allows the water to flow out into the
[1:10:59]
flood plane which is agricultural land
[1:11:01]
>> right
[1:11:02]
>> um and then slowly released back into um
[1:11:05]
into the elbow before flowing down into Glenmore and I think it was just
[1:11:09]
recently tested with the recent with the
[1:11:12]
recent rains and I believe that they're
[1:11:13]
sort of evaluating what the water
[1:11:15]
quality quality impacts of that have
[1:11:16]
been um Yeah.
[1:11:18]
>> Yeah. And and that's exactly I did a
[1:11:20]
tour with FCM anyways back in Calgary
[1:11:23]
anyways two years ago and I saw the
[1:11:25]
results of that management of the storm
[1:11:27]
water and it was huge but um they had to
[1:11:30]
do it because they had a a disaster a
[1:11:33]
few years previous on that.
[1:11:34]
>> So thank you for that. Just a quick
[1:11:36]
question. I'll go to the second time
[1:11:37]
speakers in a second here. Um we're going to be looking for direction
[1:11:41]
from council anyways to say um which
[1:11:43]
where we want to go on phase two um soon
[1:11:46]
here. Um just in your estimation if we
[1:11:49]
took just a simple approach for phase
[1:11:51]
two as I was suggesting just come up
[1:11:52]
with storage solution or something like
[1:11:54]
that. Um we're talking budget here. You
[1:11:57]
know we have I understand $431,000 left
[1:11:59]
in our budget anyways that we have
[1:12:01]
allocated for this study. um could
[1:12:03]
that's uh just that portion and not do
[1:12:07]
anything else that was suggested would
[1:12:09]
that be able to be done for uh within
[1:12:11]
our budget.
[1:12:13]
So the so just to in ter of clarifying
[1:12:16]
um so looking specifically at the um at
[1:12:20]
the offstream yes storage um and just that comp component of it um yes
[1:12:25]
yeah um yeah um in terms of the broader
[1:12:29]
um sort of ideas it that's going to
[1:12:31]
depend a little bit on the scope but
[1:12:33]
that that piece of the scope yes
[1:12:35]
>> I I would expect it would be within that
[1:12:37]
but uh just from your your past work all
[1:12:40]
you had to do on that but I just
[1:12:42]
>> don't assume anything unless you get get
[1:12:44]
the answer. Thanks. Thanks for that,
[1:12:45]
Greg. Councelor Gore has another
[1:12:47]
question.
[1:12:48]
>> Thank you.
[1:12:48]
>> Oh, sorry. And councelor Gran, you you
[1:12:50]
want to follow up too, Council Gore and
[1:12:52]
then over to you. Yes.
[1:12:54]
>> Thanks. Thank you, Mayor. Um,
[1:12:57]
you mentioned about the potential uh to
[1:13:00]
withdraw from the aquifers.
[1:13:03]
Um,
[1:13:05]
and looking at the the studies of the
[1:13:07]
aquifer that have been done by the RDN,
[1:13:10]
we see that our acryers are stressed.
[1:13:12]
Uh, I think 216 is not um coming back up
[1:13:17]
as as quickly as as we would like it to.
[1:13:20]
Um, but also the interconnectedness of
[1:13:24]
the groundwater and the surface flow.
[1:13:26]
So, I want to make sure we are doing it
[1:13:28]
responsibly. We just don't think that
[1:13:30]
the groundwater let's take it all. uh uh
[1:13:32]
because that will eventually also impact
[1:13:35]
the the the surface flow in the
[1:13:36]
Englishman. So do you still think the
[1:13:40]
aquifer is a viable option and not
[1:13:43]
impacting the base flow in the
[1:13:44]
Englishman? Um
[1:13:48]
and and 216 in your opinion is it is it
[1:13:50]
healthy? Is it is it able to recharge as quickly as as we would like? So we
[1:13:56]
can use this as a viable option as a
[1:13:59]
ground water source. Um yes so yeah cl
[1:14:05]
qualify on that. So so um our
[1:14:08]
groundwater hydraologists so water line
[1:14:10]
um they they evaluated the data and in
[1:14:13]
their opinion that there's um there is
[1:14:16]
potential to help supplement um the
[1:14:19]
community withdrawal but there isn't
[1:14:20]
enough to provide all of the water needs
[1:14:22]
for the community. So there's there um there's appears to be at a high
[1:14:29]
level in terms of with the data that to
[1:14:31]
be able to supplement but not to be able
[1:14:34]
to provide there's not sufficient to be
[1:14:37]
able to just rely on the groundwater. So
[1:14:40]
>> right uh and just to clarify I think
[1:14:42]
that withdrawal to supplement is
[1:14:44]
expected in the summer months. Uh that's
[1:14:47]
when also the the river is more
[1:14:49]
stressed. uh and in my opinion I think
[1:14:51]
even the acquers would be at the at
[1:14:53]
their lowest um so maybe there's a sweet
[1:14:56]
spot that we can you can get that number
[1:14:58]
right in terms of the aquifer like I
[1:15:00]
said without impacting the acryers also
[1:15:02]
you know help the the surface flow uh so we're not impacting that okay thank
[1:15:07]
you welcome
[1:15:08]
>> yeah I just mentioned as well councelor
[1:15:10]
Gorb recently at the RDN Erica put a
[1:15:13]
presentation to us anyways about the
[1:15:15]
water confirming that Parksville was or
[1:15:17]
19 wells are using aer uh 216
[1:15:21]
and also but uh had other data
[1:15:24]
suggesting that our wells actually were
[1:15:27]
not being uh stressed actually they were
[1:15:30]
um regular they hadn't uh dropped in
[1:15:33]
fact a couple had actually improved and
[1:15:36]
it's right in the report from Murray was
[1:15:38]
there as well with foracular 2 and6 I
[1:15:41]
just had pull up the stats anyways here
[1:15:43]
on that actually our spring wood
[1:15:45]
wellfield is actually doing Well, we're
[1:15:49]
not stressing because of climate change
[1:15:51]
at this time. Uh, councelor Gren, go
[1:15:54]
ahead.
[1:15:54]
>> Thank you, Mr. Mayor. And actually,
[1:15:56]
separate from my questions, uh, I am a
[1:15:59]
bit confused on some of this
[1:16:01]
terminology. Uh, when we speak about an
[1:16:03]
aquifer being stressed, uh, am I correct
[1:16:07]
that that actually refers to the, uh,
[1:16:09]
the number of straws, so to speak, that
[1:16:11]
are permitted to be in that aquifer uh,
[1:16:15]
as opposed to the amount of water that's
[1:16:16]
in the aquifer? It's just the potential
[1:16:18]
to draw from the aquifer as opposed to
[1:16:20]
the ability of the aquifer to supply
[1:16:23]
that.
[1:16:26]
» Yeah. Yeah.
[1:16:27]
>> I think it's it's a combination there
[1:16:29]
where um the term for an aquifer being
[1:16:33]
stressed. Again, I'm not a hydraologist
[1:16:35]
or hydro geologist either. My
[1:16:37]
understanding is that the the rate of
[1:16:39]
recovery of the aquifer level is is
[1:16:42]
declining or it's you know it's not
[1:16:45]
coming back as quickly as it used to
[1:16:47]
type thing.
[1:16:48]
My my understanding is since the um or
[1:16:51]
prior to the water treatment plant being
[1:16:53]
in place that the the groundwater usage
[1:16:55]
was higher than it is today and uh since
[1:16:59]
that time there's more surface water
[1:17:02]
through the water treatment plant such
[1:17:04]
that the groundwater has recovered a
[1:17:07]
little bit better and uh such that
[1:17:09]
there's the uh water levels looking at
[1:17:13]
the data that uh that we had for the
[1:17:15]
study and it's within I water lines
[1:17:18]
appendix within the study. It shows sort
[1:17:20]
of increasing trends of of groundwater
[1:17:22]
levels in several of the uh the city's
[1:17:25]
well points
[1:17:27]
>> because that's how you could say that
[1:17:28]
the aquifer is both stressed and
[1:17:30]
recovering
[1:17:32]
>> because that's what it's I think
[1:17:34]
described as right. So so it's stressed
[1:17:36]
in that there are a lot of uh draws on
[1:17:38]
that aquifer. Uh there's a lot of
[1:17:41]
potential that could be using the
[1:17:42]
aquifer. Not just the city of
[1:17:44]
Parksville, but a number of wells uh are
[1:17:46]
using that aquifer. Uh but the actual
[1:17:49]
overall trajectory of the aquifer is
[1:17:50]
that it's recovering.
[1:17:53]
>> Is that correct?
[1:17:54]
>> I think we'd have to review it further.
[1:17:55]
Yeah. In this in
[1:17:56]
>> Okay. That's just what I've seen and
[1:17:58]
what I think the report is kind of
[1:17:59]
indicating. Yep.
[1:18:00]
>> Maybe Murray wants to step in on that.
[1:18:02]
Yeah.
[1:18:07]
Okay.
[1:18:14]
» So the uh the concept of aquifer stress
[1:18:17]
at least in how we treat it in our water
[1:18:19]
budget studies that we do in the RDN uh
[1:18:22]
is more of a mass balance thing. So it's
[1:18:24]
not looking at the number of straws in
[1:18:25]
the aquifer. It's looking at how much
[1:18:27]
water is withdrawn compared to how much
[1:18:28]
water is is uh recharged to the aquifer
[1:18:31]
using lots of elaborate models that I
[1:18:33]
don't understand either. Um so the
[1:18:37]
concept of the stress level of the
[1:18:39]
aquifer and whether the aquifer is is
[1:18:42]
stable or recovering or diminishing
[1:18:44]
those are two different things. So one
[1:18:46]
is based on a on a math balance and the
[1:18:49]
other one's based on a relatively
[1:18:50]
long-term trend. And I think what you've
[1:18:53]
all said here is is really accurate in
[1:18:55]
216. It's a very heavily uh utilized
[1:18:58]
aquifer and it's it's highly stressed uh
[1:19:00]
from a mass balance perspective, but it
[1:19:03]
is recovering uh particularly locally in
[1:19:06]
the uh around Springwood because the
[1:19:08]
city hasn't been using that water for 5
[1:19:10]
years at any great amount.
[1:19:13]
So, it's there's two two quite different
[1:19:15]
concepts there.
[1:19:18]
>> Yeah, thank you for that clarification.
[1:19:19]
I think it's pretty important to
[1:19:20]
understand because as much as possible
[1:19:23]
to understand um because there's a
[1:19:25]
difference between uh I guess like
[1:19:28]
having a bank account that has a lot of
[1:19:30]
people doing withdrawals from the bank
[1:19:32]
account but that doesn't speak to
[1:19:33]
whether the bank accounts being
[1:19:34]
replenished with cash or not. So, you
[1:19:37]
could say it's stressed and that there
[1:19:38]
are a lot of people with with debit
[1:19:40]
cards out there on that bank account,
[1:19:42]
but that doesn't speak to whether fully
[1:19:45]
whether there's enough in the bank
[1:19:46]
account to supply all those those cards.
[1:19:49]
Um, so anyway, that was a little tangent
[1:19:52]
there. Thank you for clarifying. Thank
[1:19:53]
you for that, Murray. Um I the I think
[1:19:57]
one of the uh overarching questions that
[1:19:59]
the community has on on this whole topic
[1:20:02]
is uh speaks to why are there so
[1:20:06]
frequent watering restrictions put in
[1:20:07]
place? Uh and they seem to kind of come
[1:20:09]
more frequently than they used to. Um uh
[1:20:13]
maybe can you get into what the findings
[1:20:15]
are that where that would be attributed?
[1:20:18]
Is it and to what extent is it climate
[1:20:19]
change? To what extent is it population?
[1:20:22]
And um and on the population side, would
[1:20:26]
you say that uh the population of
[1:20:29]
Parksville has been increasing uh at a
[1:20:32]
higher or as expected or lower rate than
[1:20:35]
what the previous like I think 2011 plan
[1:20:39]
was uh expecting. Um so maybe you can
[1:20:43]
sort of circle around those topics.
[1:20:45]
Thank you.
[1:20:48]
Um yeah, I will I'll follow up on the on
[1:20:51]
the first first part of of the the
[1:20:54]
question there in terms of the um the
[1:20:56]
changes that we've been seeing. Um I I'm
[1:21:00]
not sure if we've got a copy of the
[1:21:02]
report up that could be be shown, but
[1:21:05]
there's um let me just double check the
[1:21:07]
uh
[1:21:11]
what [clears throat] page it's on, but
[1:21:12]
just give me one second.
[1:21:45]
Yeah. So, I um I think it's on page 6-4,
[1:21:49]
I think.
[1:22:00]
» Page of the PDF.
[1:22:01]
>> Yes. Uh, I'll see if I can find it.
[1:22:04]
Apologies for the uh the delay. I think
[1:22:06]
this would just be it's a it's a helpful
[1:22:08]
image to help explain what's going on.
[1:22:11]
Um,
[1:22:35]
Yeah. So, it's on it's paid. Uh
[1:22:38]
>> got the one there, Greg.
[1:22:40]
>> Um yeah, that one that one that one will
[1:22:43]
work.
[1:22:45]
Um,
[1:22:50]
so,
[1:22:52]
uh, actually
[1:22:55]
there should be another one. Um, is it
[1:22:58]
this one? Yeah, here we go. It's on it's figure 6-6. It's on page um 57,
[1:23:08]
yeah, that one there. Um,
[1:23:12]
so, so this this is a a a graph. Um, oh,
[1:23:17]
uh, next one down. Yeah, that's it
[1:23:18]
there. Perfect. Thank you. So, thank
[1:23:20]
thanks for your patience and bringing
[1:23:22]
that up. It just helps with explaining
[1:23:23]
what's going on. Um, so this is a a
[1:23:27]
graph showing flow in the Englishman
[1:23:29]
River. um
[1:23:31]
over with the um the orange the orange
[1:23:36]
line um being sort of conditions between
[1:23:40]
2007 and 2015 and the green line being
[1:23:44]
conditions between uh uh 2016 and now.
[1:23:48]
So
[1:23:50]
roughly 10ear periods. And um the down
[1:23:55]
at the bottom of the chart, you can see
[1:23:58]
those two areas that are highlighted um
[1:24:01]
in in orange and in green and the the
[1:24:06]
dashed line below those it is showing
[1:24:11]
the what the base flow in the river. So
[1:24:13]
this is the average. So what the base
[1:24:15]
flow in the river would be if there
[1:24:18]
weren't releases from the dam. um and
[1:24:21]
the area between those two. Um so that orange area and the green area is
[1:24:28]
representing the volume of storage that
[1:24:30]
is being released from the dam over
[1:24:32]
time. And so there's a couple of things
[1:24:34]
going on. Um one is the over time the the
[1:24:42]
rate that the water level is dropping in
[1:24:44]
the spring isn't really changing very
[1:24:46]
much, but it's happening sooner in the
[1:24:49]
year. Um and and the second is that the
[1:24:52]
base flow the ultimate low point is also
[1:24:55]
getting lower. Um so so the amount of
[1:24:58]
water that's being released from the dam
[1:25:02]
to support um both the environmental
[1:25:06]
flow needs as well as like well the
[1:25:08]
environmental flow needs is increasing
[1:25:10]
um over time and then on top of that
[1:25:13]
there are the uh the community
[1:25:16]
withdrawals because that um the line sh the solid line shown is the would be the flow in the like
[1:25:26]
just upstream of the intake, right? So,
[1:25:28]
just before the water gets withdrawn.
[1:25:29]
So, that that includes both the
[1:25:31]
community withdrawal and the the uh the
[1:25:34]
EFN. Um yeah, so there's there's um
[1:25:38]
there is the data is showing there's ch
[1:25:40]
it's changing um and there like there are a number of reasons for that.
[1:25:46]
There's there are climate change reasons
[1:25:48]
for that. Um there are increased
[1:25:51]
um some increase in demand over time um
[1:25:55]
because of the warmer years and warmer
[1:25:57]
summers higher higher demand for
[1:25:59]
irrigation. Um as well as there have
[1:26:02]
been like like the the ways that the
[1:26:06]
watershed is used in terms of the land
[1:26:08]
use like does have impact on on flows.
[1:26:11]
Um it's hard to quantify that. It's
[1:26:12]
really difficult to quantify it but
[1:26:14]
there are there there can there can be
[1:26:16]
changes. So things are changing and and
[1:26:19]
that's the data is showing that there
[1:26:21]
have been significant changes in the
[1:26:23]
water even in a fairly short amount of
[1:26:25]
time over the last 20 years um in terms
[1:26:27]
of the the volume of water that's now
[1:26:30]
required to support both the
[1:26:32]
environmental flow need and there's only
[1:26:36]
like the bank account account
[1:26:37]
analogology analogy there's there's $7
[1:26:41]
million [laughter]
[1:26:43]
in in the bank account um and and the
[1:26:46]
withdrawals are getting higher. So, it's
[1:26:48]
just it we're like the amount of water
[1:26:50]
that's available is at the dam. Um so,
[1:26:53]
in order to um to reduce the amount of
[1:26:58]
withdrawals, both the community demand
[1:27:00]
and and the environmental flow need um
[1:27:02]
have both been reduced like need to be
[1:27:04]
reduced in order to sort of conserve
[1:27:06]
that that storage for the long over the
[1:27:09]
longer period because it is you can also
[1:27:11]
see how much longer the the releases are
[1:27:14]
from the down as well. Yeah.
[1:27:16]
>> So, there's a second part of that
[1:27:17]
question. Thank you. As well that maybe
[1:27:19]
I'll let you get to, but before uh that
[1:27:21]
part, it could be other things I didn't
[1:27:23]
mention as well, like maybe like
[1:27:25]
forestry practices upstream or uh
[1:27:28]
changes in the land um ge geographically
[1:27:31]
or whatever that the water is not
[1:27:32]
necessarily making its way down where it
[1:27:34]
used to uh hydrogeeology or whatever. Um
[1:27:38]
so there are a number of factors that
[1:27:39]
could affect that. Um but then it does
[1:27:42]
raise the question around whether the um provincial legislation sort of
[1:27:47]
the agreement around the water license
[1:27:50]
uh is still appropriate given uh where
[1:27:53]
you know things have changed since that
[1:27:54]
was put in place. Uh and on that as well
[1:27:58]
is that the the flow requirement that
[1:28:00]
does trigger the um the need to put in
[1:28:03]
watering restrictions that gauge um is measuring the post uh human use
[1:28:11]
number. Right? So the gauge is past the
[1:28:13]
intake but we have to provide but the
[1:28:16]
flow rate that we're expected to provide
[1:28:18]
based on the provincial uh operating
[1:28:21]
licenses that happens uh that amount
[1:28:25]
includes the human use and the EFN right
[1:28:29]
>> um
[1:28:30]
>> like what is the what is the number that
[1:28:31]
we have to provide for the habitat?
[1:28:35]
>> Yeah. So, so currently the the um based
[1:28:38]
on ongoing conversations with with the
[1:28:41]
regulator um with First Nation, there's an ag there's an agreement right
[1:28:47]
now on a on a temporary basis to
[1:28:51]
establish the the flow downstream of the
[1:28:54]
intake. So, the flow in the river from
[1:28:56]
the intake to the ocean where the gauge
[1:28:59]
is located is is 1 cubic meter per
[1:29:01]
second. Um and and so the flow upstream
[1:29:04]
of the intake is 1 meter per second plus
[1:29:08]
whatever the community is using at the
[1:29:10]
time. Um and so so it it's that one
[1:29:15]
cubic meter per second doesn't include
[1:29:16]
the community withdrawal. It's it's in
[1:29:19]
addition to um the community withdrawal
[1:29:21]
or the community withdrawal is in
[1:29:22]
addition to that, I guess, is maybe
[1:29:23]
another way of of putting it. the amount
[1:29:26]
that you're having that's being released
[1:29:27]
from the dam um needs to both provide
[1:29:31]
the community withdrawal as well as
[1:29:34]
maintain one cubic meter per second.
[1:29:36]
It's not it's not necessarily it's not
[1:29:38]
releasing the full 1 cubic meter per
[1:29:40]
second. There is a contribution from the
[1:29:42]
base flows in the river that are adding
[1:29:44]
to that
[1:29:45]
>> but it's um the the measurement point in
[1:29:49]
that 1 cubic meter per second.
[1:29:50]
>> Yeah. I'm talking about the point at
[1:29:51]
which it's measured.
[1:29:52]
>> Yeah. uh that being one cubic meter per
[1:29:55]
second but that one cubic meter per
[1:29:58]
second sorry are you saying that is
[1:30:00]
including both uses or just the EFN
[1:30:02]
>> just the EFN
[1:30:03]
>> cuz uh somewhere else I think it was in
[1:30:05]
the report I think it was more around 7
[1:30:07]
to 0.9
[1:30:09]
uh and then also the uh if we look back
[1:30:14]
the the graph that councelor Wood
[1:30:16]
provided is that in fact prior to the
[1:30:18]
dam the flow rates were much lower than
[1:30:20]
even that. So uh and I'm not a
[1:30:23]
biologist. I know you're not a biologist
[1:30:24]
either, but I do understand that uh
[1:30:27]
there is a certain level of uh dynamics
[1:30:29]
to a river that are natural and that are healthy for habitat uh from the
[1:30:34]
ecologists that I do speak to. So that
[1:30:37]
having a continuous flat flow rate
[1:30:40]
throughout the whole year may not
[1:30:41]
actually be the the optimal uh habitat
[1:30:44]
creating flow rate. Um but that may be
[1:30:48]
the assumption that is being like
[1:30:49]
current that when that deal was put in
[1:30:52]
place low those years ago uh that may
[1:30:56]
have been the science of the time but is
[1:30:57]
that still the science? So that's where
[1:31:00]
I'm saying, and this may be beyond your
[1:31:02]
purview, but um it seems to me that we
[1:31:04]
may be able to um the fact that the
[1:31:08]
watering restrictions and the
[1:31:09]
reliability that this whole report
[1:31:10]
hinges on is potentially based on the
[1:31:14]
water license with the province that
[1:31:16]
itself, and I know staff is looking into
[1:31:17]
this, may need to be looked at as a way
[1:31:20]
to actually increase the reliability if
[1:31:22]
we don't have to put in stage 4 watering
[1:31:24]
restrictions because it's not due to the
[1:31:26]
fact that that's the the watering
[1:31:28]
restrictions aren't based on the the the
[1:31:31]
use of the community that much as they
[1:31:32]
are based on the flow in the river. So,
[1:31:35]
and that water license that the the
[1:31:37]
letter of the law uh that sort of
[1:31:40]
bureaucratic requirement that may or may
[1:31:41]
not be current science. I don't know
[1:31:44]
this is some ponderings [laughter] and
[1:31:46]
maybe beyond your purview.
[1:31:48]
>> Um
[1:31:50]
I can I'll provide some comments on it u
[1:31:52]
from from the hydraology side. Um so the
[1:31:56]
and and sort of based on some of the
[1:31:58]
previous work that that has been done
[1:32:00]
and I've been involved with um when so
[1:32:04]
the the.7
[1:32:06]
um cubic meters per second that's been
[1:32:08]
established as the critical
[1:32:10]
environmental flow need. So that's
[1:32:12]
essentially it's been established that a
[1:32:15]
flow below that rate will will
[1:32:18]
incrementally start to cause uh impacts
[1:32:21]
to to the habitat. Um so it would kind
[1:32:25]
of go from it being um uh fair, let's
[1:32:29]
say, to poor um on a on a scale. Um the
[1:32:35]
so the the one cubic meter per sec. So,
[1:32:38]
and then that was established by DFO
[1:32:41]
back in the '9s when uh the dam was
[1:32:44]
first constructed.
[1:32:46]
There was a study done as part of the construction for the new intake that did um habitat simulation modeling
[1:32:56]
uh for the reach of the river from the
[1:32:57]
intake to the ocean. And essentially
[1:32:59]
what that's looking at is what's the
[1:33:01]
what is the um value of that habitat
[1:33:05]
from a from a a habit productivity
[1:33:08]
perspective um versus the flow and and
[1:33:13]
it's kind of like a hockey stick. It's
[1:33:15]
it and and interestingly the modeling
[1:33:18]
was showing that 7 is about right um in
[1:33:21]
terms of that critical point where that
[1:33:23]
the the the value of the habitat um for
[1:33:26]
the different fish species really starts
[1:33:28]
to drop off. The only one that isn't um
[1:33:33]
is is the PAR which are sort of that
[1:33:36]
intermediate stage um of of the fish and
[1:33:39]
it's really more of a kind of a straight
[1:33:40]
line. So like for them it's sort of like
[1:33:42]
more flow is better, right? And so it's
[1:33:44]
trying to find that happy balance of of
[1:33:46]
what is um what's appropriate and based
[1:33:50]
on conversations um with the regulators
[1:33:54]
and it's not it's not just the
[1:33:55]
regulatory biologist, it's also the the
[1:33:58]
fisheries biologists at at the province
[1:34:00]
and at DFO. Um there's been agreement
[1:34:04]
that that one cubic meter every second
[1:34:06]
is is a suitable target. Um, the
[1:34:10]
original
[1:34:12]
EFN was established based on a policy. I
[1:34:16]
I'm not sure of the status of that
[1:34:17]
policy anymore, but it used to be based
[1:34:20]
on a metric that was 10% of the mean
[1:34:24]
annual flow in the river is what the
[1:34:26]
flow should be. and and that was based
[1:34:29]
on on some some studies that have been
[1:34:32]
done across BC and in the states around
[1:34:35]
looking at what a sort of suitable
[1:34:37]
target should be and that was what that
[1:34:39]
was established at. Um I can't remember
[1:34:42]
the number off the top of my head but I
[1:34:44]
believe it was about 1.2 was what was
[1:34:47]
originally established. Um so just in
[1:34:49]
terms of like that the new one is
[1:34:52]
actually a little bit below that now. Um
[1:34:54]
and so yeah, so it's it and also based
[1:34:58]
on that habitat simulation modeling 1
[1:35:00]
cubic meter per second uh is a
[1:35:04]
reasonable target to provide
[1:35:07]
um reasonable habitat function in the
[1:35:10]
river but granted it is higher than what
[1:35:14]
used to be there before in the natural
[1:35:16]
system. Yeah. And but I can't get into
[1:35:19]
sort of the benefits of that both sort
[1:35:22]
of locally for the watershed but also
[1:35:24]
regionally because it's sort of there's
[1:35:25]
both of those kind of two two components
[1:35:27]
to that.
[1:35:28]
>> Okay. C council I'm going to um we're
[1:35:30]
striving I I'll be striving to adjourn
[1:35:33]
by 12:30 but at that time I want time
[1:35:36]
anyways to make the recommendations as
[1:35:38]
well. I'm going to take a couple more
[1:35:40]
questions but please keep it brief if
[1:35:42]
you can. Councelor P has had his hand
[1:35:44]
up. Councelor Fra, Councelor Bill, and and councelor Martin. Okay, go. I'll
[1:35:50]
try to keep mine quick. I just wanted to
[1:35:52]
know about the spillover of the dam. If
[1:35:54]
you have any information that we can see
[1:35:55]
like this where it shows how frequently,
[1:35:58]
you know, what time periods we've had
[1:35:59]
that spillover. So, if we're considering
[1:36:01]
raising the dam, you know, I'd like to
[1:36:03]
know when is that opportunity and how
[1:36:05]
much opportunity are we looking at.
[1:36:07]
>> Um, yeah. So, I think if we go back to
[1:36:10]
the previous slide, it has the water
[1:36:12]
levels over time. Um
[1:36:14]
so this is a short um uh so the so the
[1:36:19]
orange um the orange and the green lines
[1:36:23]
are also showing like the median water
[1:36:26]
levels in the reservoir and when the
[1:36:28]
reservoir is full at the top of the
[1:36:29]
graph there that's when it's filling.
[1:36:31]
though in most years um it does fill but
[1:36:34]
there are there are some years where it
[1:36:37]
hasn't and that's that sort of gray dash
[1:36:40]
line along the bottom that's the minimum
[1:36:42]
lake level that's ever that's been
[1:36:44]
recorded on that specific day. So it's
[1:36:47]
not
[1:36:47]
>> does this have a time frame associated
[1:36:49]
with it? Like what are we
[1:36:51]
>> Yeah.
[1:36:53]
So the the the lower gray dash line
[1:36:58]
>> Yeah. is is the minimum water level. And
[1:37:01]
so there have been there have been years
[1:37:03]
in the historical record where the lake
[1:37:05]
hasn't refilled because of limitations
[1:37:07]
in the inflow. And those would really be
[1:37:09]
what is what would drive the reliability
[1:37:12]
for the system. Um so on average, yeah,
[1:37:15]
there's there there's sufficient there
[1:37:17]
is sufficient flow. Um but it's those
[1:37:21]
year-over-year drought conditions where
[1:37:24]
it wouldn't refill or may not refill. Do
[1:37:27]
we have any idea how much spillover
[1:37:29]
we're talking about there too? Because
[1:37:31]
if it's just reaching the top, it could,
[1:37:32]
you know, we call it spillover, but with
[1:37:35]
barely any versus it's spilling over a
[1:37:37]
ton.
[1:37:37]
>> Yeah. So the um
[1:37:41]
again, I'm just going from from memory
[1:37:44]
from from work, but the so the the total
[1:37:47]
volume is about nine 9 million cubic
[1:37:49]
meters. So there's 7 million cubic
[1:37:52]
meters of active storage and there's two
[1:37:54]
million cubic meters of of emergency
[1:37:58]
storage and the reason why it's
[1:37:59]
emergency storage is because it has a
[1:38:00]
limited amount of flow that can be
[1:38:02]
released and it doesn't meet the
[1:38:03]
environmental flow need target. Um so
[1:38:05]
there's 9 million cubic meters of total
[1:38:07]
storage. The average inflow on an annual
[1:38:10]
basis to the Aerosmith wershed and this
[1:38:12]
is based on data like before the dam was
[1:38:15]
constructed. Um, so that's in the 90s I
[1:38:18]
believe was in around 12 to 14. So, so
[1:38:23]
it's a fairly like that 9 million is a
[1:38:25]
pretty large percentage of the the just
[1:38:29]
the the average. So there's there's that
[1:38:31]
extra say like
[1:38:35]
anywhere from four to six million extra
[1:38:38]
on on average in a in a year, but that's
[1:38:40]
the average. Yeah. Okay. Councelor Bill
[1:38:44]
and then councelor Martin.
[1:38:46]
>> Thank you, Mr. Mayor, and thank you
[1:38:47]
again. Uh, I guess I'm going to go back
[1:38:50]
to uh, Councelor Gore's sweet spot idea.
[1:38:53]
And I guess what I'm hoping for, in
[1:38:54]
fact, what I am hoping for is that we
[1:38:57]
could eventually end up with uh upland
[1:39:01]
storage that will be um sufficient to
[1:39:05]
provide the EFN as well as additional
[1:39:09]
waters for the community for a longer
[1:39:11]
period than we have allowing for even no
[1:39:15]
snowpack but uh longer drought etc.
[1:39:19]
as well as um looking at our aquifer and
[1:39:25]
one of the notions in our OCP is that we would be a sustainable city. So
[1:39:31]
I part of that I think for me means that
[1:39:33]
we're not actually going to other
[1:39:34]
aquifers that we're doing everything
[1:39:36]
that we can to improve the health of the
[1:39:38]
aquifer that we have and I don't know if
[1:39:41]
that uh if much of that would be within
[1:39:44]
phase two if it was with your company.
[1:39:47]
uh it also may be things that we can be
[1:39:49]
doing you know at the city level but I
[1:39:51]
do believe that there's more that we
[1:39:52]
could be doing but nonetheless uh
[1:39:55]
looking at that upland storage and
[1:39:58]
providing more water for the community
[1:40:02]
should also allow the aquifer to further
[1:40:05]
recharge as well as additional
[1:40:07]
conservation methods and I I do think
[1:40:10]
that we need to continue to look at
[1:40:11]
conservation and a couple of points that
[1:40:13]
councelor Gren has made made around you
[1:40:16]
values and looking going forward in 10,
[1:40:19]
20, 30 years, you know, what does what
[1:40:21]
does the ideal yard look like? I don't
[1:40:24]
know. But is that something that um you
[1:40:27]
know, having those two parts come
[1:40:28]
together of both upland storage for the
[1:40:31]
health of the river and also allowing
[1:40:35]
for uh a healthier aquifer without
[1:40:38]
having to go outside the one that we're
[1:40:41]
using now?
[1:40:44]
Um did you want to provide comment on
[1:40:47]
that first side?
[1:40:49]
>> Sure. Yeah. Um yeah, at this point we're looking at optimizing the existing
[1:40:55]
groundwater usage within the existing
[1:40:58]
license volume available.
[1:41:00]
Um so yeah for the for the long term if
[1:41:03]
there is a new source storage water
[1:41:05]
source uh provided or constructed then the groundwater use would would
[1:41:11]
probably stay similar as it is today and
[1:41:13]
if we're in a sort of inclining trend or
[1:41:17]
improving to be more healthy then
[1:41:18]
hopefully that would continue.
[1:41:22]
Okay, great.
[1:41:23]
>> And my understanding is that um that
[1:41:26]
some of the steps that could be taken
[1:41:27]
within the city both on city land as
[1:41:29]
well on private land could in fact
[1:41:32]
increase the amount of groundwater that
[1:41:34]
is you know water rainwater that is
[1:41:36]
going into the ground and that in turn
[1:41:38]
should also improve the health of local
[1:41:41]
streams and ultimately get to the river
[1:41:43]
as well. Would it not?
[1:41:46]
>> Council. Yeah, absolutely. any um
[1:41:48]
further storm water storm water
[1:41:50]
management practices that would
[1:41:52]
encourage infiltration are definitely of
[1:41:54]
benefit. And uh and of course the water
[1:41:57]
conservation in itself to uh to sort of
[1:42:01]
beef up your existing water conservation
[1:42:03]
program to to use less water during the
[1:42:06]
summer months and and allow for it to to
[1:42:08]
exist where it is.
[1:42:10]
>> Thank you, Councelor Martin. Go ahead.
[1:42:13]
>> Thank you, Mr. Mayor. I I really uh
[1:42:15]
would like to see if you would give us
[1:42:17]
say A, B, or C. What would be the most
[1:42:20]
not necessarily the cheapest, the most
[1:42:22]
practical long-term solution to this?
[1:42:25]
Because I was hoping today that we would
[1:42:27]
have that because you're the
[1:42:29]
professionals that know, you've given us
[1:42:31]
a report, but a decision to understand
[1:42:34]
what would be best for us. And like
[1:42:36]
counselor Frazz was saying, not
[1:42:38]
necessarily the, you know, the cheapest,
[1:42:41]
but the the wisest for long term because
[1:42:44]
we're going a long term for this. So, do
[1:42:46]
you have any solutions that you can give
[1:42:48]
us? What should we do? Really,
[1:42:52]
the practical thing, smart thing,
[1:42:55]
because that's what I would like.
[1:42:57]
>> Well, you know, a report. This is a big
[1:43:00]
report and you understand it way more
[1:43:02]
than any one of us. So what what would
[1:43:04]
you do if you were making that decision?
[1:43:08]
>> What would you do?
[1:43:09]
>> Thank Martin. Um
[1:43:13]
so
[1:43:15]
[snorts]
[1:43:15]
one of the challenges is that
[1:43:19]
unfortunately there's not kind of a
[1:43:21]
clear solution in the in the level of
[1:43:24]
the analysis that was done. Um and so I
[1:43:28]
think in terms of the decision for me if
[1:43:32]
it was if it was my decision to be
[1:43:34]
making um would be to kind of go to that
[1:43:37]
next step of provide like of of
[1:43:39]
evaluating the the um options that have
[1:43:43]
been identified in this preliminary
[1:43:45]
study um in in a bit more detail. It's
[1:43:48]
not it's not there isn't sort of a clear
[1:43:50]
direction at this at this at this point
[1:43:52]
um because of the um the at the level of
[1:43:57]
which this study was was preliminary to
[1:44:01]
kind of set the next stage for that
[1:44:03]
phase two was to sort of help with
[1:44:06]
firstly um sort of establishing how much
[1:44:09]
water is needed um and then and then
[1:44:12]
secondly start to look at some options
[1:44:15]
but there's there's more work needed to
[1:44:18]
be able to to make that final decision.
[1:44:21]
>> So, you can't give us
[1:44:24]
options. Okay.
[1:44:25]
>> Because I know our our citizens are are
[1:44:28]
concerned and we are and we want to make
[1:44:30]
sure we're doing the wisest thing.
[1:44:32]
That's all.
[1:44:33]
>> So, we have to Okay. Thank you.
[1:44:36]
>> Okay. Thank you. That's I'm going to
[1:44:38]
have to wrap it up. Um these people
[1:44:40]
probably have other work to go back to
[1:44:41]
their job, but um council I'm going to
[1:44:44]
be looking for um a recommendation
[1:44:46]
resolution anyways um to just my my
[1:44:50]
belief is we've had a lot of good
[1:44:51]
comments and there's a lot of
[1:44:53]
understanding anyways of what is
[1:44:55]
possible and I understand phase two
[1:44:57]
there was a list of things that they
[1:44:59]
could possibly look at would be looking
[1:45:01]
direction but I'm I'm suggesting at this
[1:45:04]
particular time that we have KWL look at
[1:45:07]
the possibilities as We spoke earlier of
[1:45:10]
just the sidestream storage option which
[1:45:13]
then once we have that question answered
[1:45:15]
then there may be some money left over.
[1:45:18]
Then then we look at what we do with
[1:45:21]
that information. But we have to have
[1:45:22]
that as to say that if we had sidestream
[1:45:26]
storage with reservoir capacity is going
[1:45:28]
to in charge um protect or improve our
[1:45:31]
acryers which is one of our goals as
[1:45:33]
well as council has mentioned which is
[1:45:35]
good. At the same time, it may delay us
[1:45:37]
actually have to look for more
[1:45:39]
groundwater sources at at the same time.
[1:45:41]
I think we have to have that question
[1:45:43]
answered first before we make the
[1:45:45]
decisions before we go anywhere further.
[1:45:48]
And I I would suggest if we I could make
[1:45:50]
that recommendation as to continuing on
[1:45:53]
with phase two as a phased approach and
[1:45:57]
uh with uh uh phase two would just
[1:46:00]
consist of that and then that would be
[1:46:02]
brought back to council with that
[1:46:03]
information and then we say okay where
[1:46:05]
are we going to either make this happen
[1:46:07]
and then we make the recommendations
[1:46:09]
back. Do I have approval for councel to
[1:46:12]
second that motion?
[1:46:18]
Um
[1:46:22]
yeah yeah yeah for recommendation would
[1:46:25]
be that uh the KWL look into the options
[1:46:28]
for the sid stream of the uh excess uh
[1:46:32]
fall and winter rains to uh provide a
[1:46:36]
phased approach for reservoirs in the
[1:46:38]
vicinity of Parksville instead of up on
[1:46:40]
the highlands. possibly considering
[1:46:42]
looking at industrial land uh that we
[1:46:44]
have in our industrial park as a portion
[1:46:47]
of it as well as mosaic lands which is
[1:46:50]
the next coastal because we don't have
[1:46:52]
ground lands here we have privately
[1:46:53]
owned lands so just looking at those
[1:46:55]
options first
[1:46:57]
>> second it
[1:46:59]
>> thank you council press any
[1:47:02]
>> this is committ so this recommendation
[1:47:03]
to council
[1:47:04]
>> is this just recommendation from cootw
[1:47:07]
then we'll go to councel
[1:47:10]
Okay. Um
[1:47:12]
Okay. Yeah. Go ahead. Uh on the motion
[1:47:15]
on the floor. Thank you.
[1:47:17]
>> Yeah. Yes. Go ahead, council.
[1:47:18]
>> Oh, thank you. I'm just wondering if um
[1:47:23]
is it also make some sense to perhaps
[1:47:25]
have an alternate recommendation so that
[1:47:28]
if this one is not supported that
[1:47:31]
there's something else that would come
[1:47:32]
forward or are we going to be sort of
[1:47:35]
prevoting on the recommendation so that
[1:47:38]
then we have a motion to take to the
[1:47:40]
actual meeting. I'm sorry I'm not clear
[1:47:42]
on that. I I agree and having made that
[1:47:44]
motion, I I think KW understands that
[1:47:48]
that's what I'm looking for. As council
[1:47:50]
Martin says, we want a solution and
[1:47:52]
councelor Martin's right. So we want
[1:47:54]
your your solution that would include
[1:47:56]
that and if the side storage
[1:47:59]
doesn't pan out to be looking like a
[1:48:01]
good suggestion. And I think KWL is
[1:48:02]
going to come back and said however
[1:48:05]
speaking to the solution we recommend
[1:48:08]
this and and I I think you understand
[1:48:11]
that's what we're looking at correct is
[1:48:12]
that guys you know
[1:48:15]
>> so quick followup one thing that I heard
[1:48:17]
earlier and correct me if I'm wrong is
[1:48:19]
that it would be more likely to access
[1:48:22]
uh provincial or federal funding if we
[1:48:25]
were going with a one of the other
[1:48:28]
options that would look at the creation
[1:48:30]
of upland storage because that in fact
[1:48:33]
directly affects then the environmental
[1:48:35]
flow needs and involves DFO etc. Now did
[1:48:39]
I misunder understand that or was that
[1:48:42]
correct?
[1:48:43]
>> I I think that's a possibility but
[1:48:45]
that's exactly what it is. It's a
[1:48:47]
possibility that you may get provincial
[1:48:49]
um uh help on that which is actually was
[1:48:53]
well I can't comment further because it
[1:48:55]
was in camera but um uh on another uh
[1:48:59]
Aerosmith uh meeting the AWS meeting
[1:49:03]
previous so it's a possibility you're
[1:49:06]
right councelor Bill councelor Fras go
[1:49:08]
ahead
[1:49:08]
>> okay just can I speak on this as a
[1:49:10]
seconder I think where we're at right
[1:49:11]
now as a committee to hold that this you
[1:49:14]
know support this motion because is
[1:49:16]
looking at an option for it. And since
[1:49:18]
it wasn't part of the report for us to
[1:49:20]
then be able to pick through where we're
[1:49:22]
going to go, I I going to have to have
[1:49:24]
more information on to where does that
[1:49:25]
weigh into it. When I look at all these
[1:49:27]
options and try to think long term, I
[1:49:29]
think there's going to be more than one
[1:49:30]
option that's going to come forward over
[1:49:32]
the years. And so, it's a little bit
[1:49:34]
more of like which order are we going to
[1:49:36]
stack them in because I don't think this
[1:49:38]
is the last time that we're going to be
[1:49:39]
looking at uh water uh solutions for the
[1:49:43]
community here. So, as far as side
[1:49:45]
stream storage, uh, we need to consider
[1:49:49]
what that looks like. Um, I'm not
[1:49:51]
supporting this as the option we're
[1:49:53]
moving forward on. I'm I'm putting into
[1:49:55]
the pile and then I think we need to be
[1:49:57]
looking at as in our at our council
[1:49:58]
table. Uh, but for right now, need more
[1:50:01]
information on it. I think it's worthy
[1:50:02]
consideration. I don't understand the
[1:50:04]
full implications of it. Uh, so I want
[1:50:06]
to support our committee the whole so
[1:50:08]
that it can be in the in the mix.
[1:50:10]
>> Right. Yeah. Thank you. And I agree
[1:50:12]
100%. Councelor Fazad said if KWL comes
[1:50:14]
back to us and says sidestream storage
[1:50:17]
where do you live where the water is is
[1:50:18]
not an option eliminate it. That's what
[1:50:21]
I want to hear. That's part of like
[1:50:22]
let's just take that off the table and
[1:50:24]
then then we'll look for your other
[1:50:26]
magic solution you pull up instead of I
[1:50:29]
have great faith in you guys. Councelor
[1:50:31]
Dory.
[1:50:32]
>> Thank you through the mayor to our
[1:50:33]
delegation. Um, can you perhaps make it
[1:50:37]
very clear to me was the sidestream
[1:50:39]
stories your number one option that you
[1:50:41]
suggested to council because what I saw
[1:50:43]
in the presentation was Shelton Healey
[1:50:46]
which was previously identified as one
[1:50:48]
of the viable options was also presented
[1:50:50]
and uh thank you councelor Wood for
[1:50:52]
doing the work on this as well. Um
[1:50:56]
I would rather prefer us go to that
[1:50:59]
option uh explore that one further in
[1:51:02]
addition to looking at raising the
[1:51:04]
Aerosmith dam which I think staff is
[1:51:06]
also recommending in the report. Those
[1:51:08]
would be two options that I would
[1:51:10]
support at this time. Uh even though it
[1:51:13]
is just the committee of the whole but I
[1:51:14]
think [snorts] having the experts you've
[1:51:16]
already done the work. I did not see the
[1:51:19]
sidestream options as being the most
[1:51:21]
viable and I'm sorry if I if I missed
[1:51:22]
that. It's been a long meeting so
[1:51:24]
correct me if I'm wrong.
[1:51:28]
» Yeah. So in terms of
[1:51:32]
doing going through the multiple
[1:51:34]
accounts evaluation that we did um those
[1:51:37]
two options came out a little bit higher
[1:51:40]
than than fishtail and we had had um
[1:51:45]
removed the offstream storage as as to go through like at the preliminary
[1:51:51]
screening stage because of the the costs
[1:51:54]
and and land like the relative costs and
[1:51:57]
the land implications. So like the the
[1:52:02]
highest ranking sites in the were
[1:52:04]
Shelton and Healey that came out through
[1:52:06]
the evaluation. So not saying that
[1:52:09]
that's necessarily again looking at
[1:52:11]
those individually, it's not necessarily
[1:52:12]
the total correct solution on a phased
[1:52:18]
approach, but it it it appeared to be
[1:52:20]
the correct solutions for in terms of
[1:52:23]
balancing across all the different
[1:52:24]
criteria that we're looking at. um in
[1:52:26]
terms of the the the direction to go.
[1:52:30]
>> Thank you. If I may follow up.
[1:52:31]
>> So So if we could rephrase it to say
[1:52:33]
that the possible solutions could
[1:52:35]
include looking at the Healey Aerosmith
[1:52:38]
Dam
[1:52:38]
>> Shelton Healey Lake and raising the
[1:52:39]
Aerosmith dam storage.
[1:52:41]
>> Well, that would be a separate motion
[1:52:42]
altogether. It looks like CEO. So
[1:52:46]
>> Oh, hi CEO Kaylor.
[1:52:48]
>> Sorry to interrupt. Um thank you mayor
[1:52:50]
through you. Um, I just wanted to remind
[1:52:52]
council we did have a motion that was
[1:52:54]
presented that was deferred for
[1:52:56]
consideration until after the committee
[1:52:58]
the whole takes place. And so what we
[1:53:00]
will be looking for at some point is um
[1:53:04]
kind of what councelor Gore is talking
[1:53:05]
about and what you've been talking about
[1:53:06]
mayor Brian is an order of priority for
[1:53:09]
that phase two. So what we wrote just
[1:53:12]
for council's recommendation or sorry um
[1:53:14]
to remind council the recommendation was
[1:53:17]
that council consider the priorities and
[1:53:19]
timing for the water use planning and
[1:53:21]
management study phase 2 scope of work
[1:53:24]
and it was deferred until after this
[1:53:26]
committee the whole um and that we would
[1:53:28]
get a quote from Kerwood Lidell on that
[1:53:30]
scope. So if there's five things that
[1:53:33]
council wants um to be advanced, we
[1:53:36]
would be then working with the
[1:53:37]
consultant to get a quote on whether
[1:53:39]
that 430 remainder um meets that budget.
[1:53:43]
So just as a reminder of kind of the
[1:53:44]
next step,
[1:53:45]
>> right? So so I I would hope that with
[1:53:47]
the amended motion anyways that would do
[1:53:49]
exactly that.
[1:53:51]
>> So sorry, mayor. I I think that looks
[1:53:54]
like CEO, you can correct me, but this
[1:53:56]
motion is very different than the
[1:53:58]
original motion from the mayor, which is
[1:54:00]
a very different direction. So, is it uh
[1:54:02]
a new motion? We'll have to vote on this
[1:54:04]
unless uh mayor you want to withdraw and
[1:54:06]
present this as an option.
[1:54:08]
>> No, what what it is is actually just
[1:54:11]
defining instead phase two, the the the
[1:54:13]
planned one was was a whole bunch of
[1:54:15]
options. If you look at what it was, it
[1:54:17]
was huge. Yeah. And including
[1:54:18]
conservation and piping and
[1:54:20]
infrastructure and so forth. I don't
[1:54:21]
want to touch that right now. That's why
[1:54:23]
I want to define it. We we have to focus
[1:54:25]
and define this right now people. And if
[1:54:28]
it means for your satisfaction Yeah. And
[1:54:30]
that we include the uh possibility of
[1:54:34]
the Healey Shelton and also across uh
[1:54:37]
aeros storage. I'm definitely in favor
[1:54:40]
of amending my motion to that. Councelor
[1:54:43]
Frazz, do you agree to the amending?
[1:54:47]
I had a different uh thought and
[1:54:50]
question here in my go ahead. But also
[1:54:51]
to amend it though it can we may not
[1:54:53]
have separate ones come out of here
[1:54:55]
though like we can have separate op they
[1:54:56]
don't have to all be brought together
[1:54:58]
under one. I think your motion to
[1:55:00]
>> Oh you mean that's what you want two
[1:55:02]
motions like one?
[1:55:03]
>> Yeah. I mean we can we can bring
[1:55:04]
multiple recommendations out of the
[1:55:06]
committee here and I and I think we
[1:55:07]
should uh in this case I believe that
[1:55:10]
we're asking for this information aside
[1:55:11]
storage. It sounds like you guys had
[1:55:13]
already done some work on it and it just
[1:55:15]
didn't meet the criteria that cut. So,
[1:55:17]
it wasn't included, but it should seem
[1:55:18]
like an easy one to bring back now if
[1:55:20]
we're just saying, "Hey, that
[1:55:21]
information that you put aside. Let's bring it back in the report so we
[1:55:23]
can look at it." I think that's I think
[1:55:26]
it's an easy
[1:55:26]
>> Okay, good suggestion. Let's leave the
[1:55:28]
original motion on the floor and then
[1:55:29]
we'll look for another motion on the
[1:55:31]
floor to do an additional one. Does that
[1:55:33]
work for you, Council? Y.
[1:55:34]
>> Okay. Thanks.
[1:55:35]
>> Okay. Uh, speaking to the motion on the
[1:55:37]
floor. Yes. Go ahead, Councelor.
[1:55:39]
>> Um, thank you, Mr. Mayor. And given the
[1:55:42]
fact that when I had read the report
[1:55:43]
earlier and when we had presentations
[1:55:45]
earlier and that the sidoom storage was
[1:55:49]
not recommended due to costs and the
[1:55:52]
amount of land that would be needed etc.
[1:55:54]
For all of those reasons with respect to
[1:55:56]
the mayor I can't support this.
[1:55:58]
>> Thank you. Uh councelor Wood go ahead.
[1:56:01]
>> Thank you mayor. I'll start by by saying
[1:56:03]
I understand uh why the sideream storage
[1:56:08]
seems to make sense on the surface of it
[1:56:10]
because we have so much water that flows
[1:56:13]
down all winter. Hey, can we can we save
[1:56:17]
some of it? Um, but when I try to get my
[1:56:21]
head around the amount of water and the
[1:56:23]
size of the hole that's 3 or 4 meters
[1:56:25]
deep, um, for the engineering [snorts]
[1:56:28]
of this, from the people I've spoken to
[1:56:32]
in this report, it just is prohibitively
[1:56:35]
expensive with permitting and everything
[1:56:37]
else. And at first, I thought it was a
[1:56:40]
good idea, but I just can't support
[1:56:42]
this. Um I my my take is I'd love to see
[1:56:46]
this committee make three
[1:56:47]
recommendations
[1:56:49]
to uh our regular council meeting. One
[1:56:51]
is for a water conservation plan. Um and
[1:56:55]
one is for upland storage. And we need
[1:56:57]
you know either C or D estimates to get
[1:57:00]
grants or other funding.
[1:57:03]
Those could be for raising the existing
[1:57:05]
Aerosmith Dam as well as Shelton and
[1:57:08]
Healey Lakes. Um, and then the third one
[1:57:11]
is to provide some grant research to see
[1:57:16]
what's available for senior government
[1:57:17]
funding because what I don't want to see
[1:57:20]
is the majority of this being on
[1:57:22]
property taxes. So, those are the three
[1:57:25]
that I'd like to see, but that's aside
[1:57:26]
from your motion, but I can't support um
[1:57:28]
sidestream storage. Thanks.
[1:57:30]
Don't you think we could include that in
[1:57:32]
the next phase after we have this
[1:57:34]
initial like I'm trying to keep it very
[1:57:37]
simple here councelor wood is I'm trying
[1:57:39]
to keep it just for the storage and so
[1:57:41]
forth and then we're going to get that
[1:57:42]
information back let's either you can't
[1:57:44]
see it working in reservoirs I have
[1:57:46]
people advising me on the outside that
[1:57:49]
it will work okay but I want now the
[1:57:52]
experts to tell us whether it's possible
[1:57:53]
to work so let's let them tell us what
[1:57:56]
it's going to be not our sources on the
[1:57:58]
outside that say it should work
[1:57:59]
absolutely Absolutely. Um let's let's
[1:58:02]
eliminate that or approve it. That's all I'm asking for here. We
[1:58:07]
can't, you know, um just bypass it and
[1:58:10]
go to the next phase. That's all. But
[1:58:12]
anyways, that's that's why I'm it's it's
[1:58:14]
here. Anyways, so
[1:58:15]
>> yeah, I'm kind of envisioning to answer
[1:58:17]
your question, mayor, I'm kind of
[1:58:18]
envisioning these would probably be two
[1:58:20]
different RFPs. One is for a company to
[1:58:22]
do a water conservation plan.
[1:58:23]
>> No. Um
[1:58:24]
>> no, no, no, no, no. Not not in this
[1:58:26]
motion here.
[1:58:28]
>> No, no, no. that will follow through in
[1:58:30]
phase two after we get this preliminary
[1:58:33]
information.
[1:58:34]
>> Yeah. And then a second RFP for class CD
[1:58:37]
upland water storage for raising
[1:58:39]
Aerosent Dam Shelton Healey Lakes. And
[1:58:42]
then the third motion would just be to
[1:58:44]
staff to look at um the provincial
[1:58:47]
funding, but I can't support this motion
[1:58:48]
as it is. Thanks.
[1:58:51]
>> Gotcha. Fries.
[1:58:53]
>> So uh through the mayor council. I think
[1:58:55]
the important part of this motion though
[1:58:56]
is that when we move forward from here,
[1:58:59]
this idea will still exist and the
[1:59:01]
people that weren't here in the meeting
[1:59:03]
today or hear that, oh, this, you know,
[1:59:04]
we we've considered it. We there's
[1:59:06]
nothing that we can point to and say,
[1:59:07]
look, there's the work and why it
[1:59:09]
doesn't why it's not a good option. I
[1:59:10]
think we need to be able to put it to
[1:59:12]
bed or it'll just keep resurfacing again
[1:59:14]
and again. So, this isn't to suggest
[1:59:16]
that this is the option that we're going
[1:59:17]
to go with, but if this information
[1:59:19]
didn't make it to the report, let's
[1:59:20]
bring it into there so that that we can
[1:59:23]
cross it off the list. So, we have
[1:59:24]
something to point to. Otherwise, just
[1:59:25]
hearsay over and over and it'll keep
[1:59:27]
coming back for years. Like I said, this
[1:59:29]
is not going to be the last time we're
[1:59:30]
dealing with the water uh issue. And I'm
[1:59:33]
sure this idea will just surface again.
[1:59:34]
And if it doesn't make the report again,
[1:59:36]
it we'll just be back to the square one.
[1:59:38]
So, I think it it let's get the
[1:59:40]
information and then we can cross it off
[1:59:42]
the list if it's not if it's really not
[1:59:44]
going to work out.
[1:59:47]
>> One more. Uh counc.
[1:59:49]
>> Yes. Just quick comment to our CEO. We
[1:59:52]
want all this information. I'm not
[1:59:53]
against the information, but we are
[1:59:55]
working with a budget as you mentioned
[1:59:56]
about $440,000 and I don't want to put
[1:59:59]
you on the spot to give in a quote on
[2:00:01]
this. But the more information we seek,
[2:00:04]
the more we draw into that that money
[2:00:05]
that we have and if we have these big
[2:00:07]
options, do you think in your opinion
[2:00:09]
we'll be able to get that information on
[2:00:11]
what the three information we we seek
[2:00:13]
from councelor Wood just mentioned and
[2:00:15]
the sideream storage would be be able to
[2:00:17]
get all this information within the
[2:00:19]
budget for the phase 2 that we have.
[2:00:23]
if I may through the mayor.
[2:00:24]
>> Okay. Okay.
[2:00:25]
>> Sorry. Thank you. Um the motion that we
[2:00:27]
presented to council was to work with
[2:00:29]
the consultant to get a budget on the
[2:00:31]
scope that you recommend as council. And
[2:00:34]
I assume the more work they have to do,
[2:00:37]
the more money it will cost.
[2:00:40]
>> Yeah, that's I've already asked that
[2:00:42]
question. It was very first. I said, can
[2:00:43]
you do what I asked on the first one
[2:00:45]
under 431,000?
[2:00:48]
So why why why go another stand and and we know it it I mean just that
[2:00:54]
that's why I'm keeping it simple like
[2:00:55]
not look at all the the conservation
[2:00:57]
infrastructure requirements because that
[2:01:00]
maybe would exceed 431,000
[2:01:02]
we already have that all we're saying is
[2:01:04]
we we want the the consultants to come
[2:01:06]
up with something right now because
[2:01:07]
believe me we're taking huge heat for
[2:01:10]
these wa these water restrictions that
[2:01:12]
are in place right now. I tell you, it's
[2:01:14]
the I can't walk down the street without
[2:01:17]
people actually
[2:01:19]
being very upset and disappointed with what we've done by doing nothing.
[2:01:24]
So these gentlemen here, as council
[2:01:27]
Martin says, give us a solution. I'm
[2:01:29]
hoping that they come up with some
[2:01:30]
alternate solutions and if it means
[2:01:32]
Morard and Healey and then that's fine
[2:01:34]
as well. But that's all I want to do at
[2:01:36]
this committee, the whole meeting today.
[2:01:38]
I'm going to call the question. All
[2:01:40]
those in favor of the motion on the
[2:01:41]
floor.
[2:01:45]
Those opposed.
[2:01:47]
Okay, that's great. Okay, we're done.
[2:01:49]
Okay, I'd like to ask thank you very
[2:01:51]
much, gentlemen, for everything that
[2:01:52]
you've done here today and u we'll
[2:01:56]
you'll be hearing from us sometime in
[2:01:58]
the future, I guess.
[2:02:00]
Thank you.
[2:02:01]
>> I would like to make a subsequent motion
[2:02:02]
now.
[2:02:03]
>> No, I'm calling for a German uh like a
[2:02:06]
motion to adjurnn.
[2:02:08]
There needs to be recommendation to the
[2:02:10]
council.
[2:02:12]
I would like to uh make a motion that
[2:02:15]
council look at perhaps Shelton and
[2:02:17]
Healey Lake as a upland storage option
[2:02:20]
and further that u council direct staff
[2:02:24]
to look at raising the capacity of the
[2:02:26]
airmith dam and further looking at uh
[2:02:30]
the conservation guidelines
[2:02:32]
uh
[2:02:34]
conservation guidelines for the
[2:02:36]
community including residential,
[2:02:37]
commercial and the resort areas
[2:02:39]
something along those lines. Thank you.
[2:02:45]
» Yeah.
[2:02:47]
No.
[2:02:48]
Is there a second?
[2:02:50]
>> I'll second that.
[2:02:54]
>> Council Frazz, go ahead.
[2:02:55]
>> Okay. Council, uh, we have these Sean
[2:02:58]
notes prepared here. I was really hoping
[2:02:59]
to hear uh, things come out of it
[2:03:02]
because I I liked what I was reading out
[2:03:04]
of here, too. Uh, so this motion kind of
[2:03:06]
dips into that as well. Um
[2:03:09]
maybe maybe Sean can speak to this. I
[2:03:11]
was hoping he'd have a chance to raise a
[2:03:12]
motion first.
[2:03:15]
>> Counc. Thank you, mayor. I did uh send
[2:03:18]
staff uh motions for these. Um the first
[2:03:22]
one is motion one, water conservation
[2:03:24]
plan. that the committee the whole
[2:03:26]
recommend that council direct staff to
[2:03:28]
include in the scope of phase 2 water
[2:03:30]
use planning and management study the
[2:03:32]
preparation of a compre comprehensive
[2:03:34]
water conservation plan consistent with
[2:03:36]
recommendation three of phase one of the
[2:03:37]
final report um procured separately from
[2:03:41]
a qualified water conservation
[2:03:42]
specialist with a scope including risk
[2:03:45]
benefit cost analysis of advanced
[2:03:48]
metering infrastructure smart meters
[2:03:50]
including leak detection and payback a
[2:03:53]
review of the city's water rate
[2:03:54]
structure including tiered pricing
[2:03:56]
options that keep water for health,
[2:03:57]
hygiene, and fire suppression affordable
[2:03:59]
while pricing discretionary use to
[2:04:02]
reflect its cost. An American Waterworks
[2:04:05]
Association M36 water audit and water
[2:04:08]
loss management plan, rainwater
[2:04:10]
retention and aquifer recharge measures
[2:04:12]
on city properties.
[2:04:15]
>> How about just do your your last two?
[2:04:17]
Let's not do all the background
[2:04:18]
information.
[2:04:19]
>> Yeah. So, the motions are
[2:04:20]
>> of order. The problem is that we
[2:04:23]
actually have a motion on the floor
[2:04:24]
unless councelor Gore would like to
[2:04:26]
withdraw that and we could have one
[2:04:28]
other
[2:04:28]
>> I'm happy to have that those motions
[2:04:30]
that looks like there those are exactly
[2:04:32]
the line of thought that I have. So I'm
[2:04:34]
happy to include those three
[2:04:36]
>> mayor. The short ones are definitely in
[2:04:38]
what's in front of you, but I just
[2:04:39]
wanted to make sure that the motions
[2:04:41]
capture the detail of what we need.
[2:04:43]
>> Are are you talking about the ask that
[2:04:45]
phase 2 be
[2:04:47]
>> scoped as two two jobs? Is that what
[2:04:49]
you're saying?
[2:04:49]
>> Yes. Yes, that's that one.
[2:04:51]
>> Yes.
[2:04:51]
>> Is that what you're talking about?
[2:04:53]
>> Uh in addition, there will be uh the
[2:04:54]
increasing the storage capacity at
[2:04:56]
Aerosmith Dam.
[2:04:57]
>> Yes. So that has been added since these
[2:04:59]
notes because we did discuss it today.
[2:05:03]
» It's a third anyways. Yeah.
[2:05:08]
>> So
[2:05:08]
>> I don't know what
[2:05:09]
>> the motion on the floor unless councelor
[2:05:11]
Wood wants to make it is the
[2:05:12]
conservation plan be uh provided. Uh
[2:05:15]
second design and costing of the upland
[2:05:17]
storage at Shelton and Heily lakes and
[2:05:19]
third would be increasing the capacity
[2:05:20]
at Aerosmith dam would be including the
[2:05:22]
scope of phase two.
[2:05:28]
» I'm not sure how we can add more details
[2:05:29]
to that later if that works.
[2:05:31]
>> That's an opportunity.
[2:05:32]
>> Would you agree to adding uh checking of
[2:05:34]
the side streams that I messaged
[2:05:39]
>> adding three to get my support
[2:05:41]
>> if the budget allows within the budget?
[2:05:44]
I and the timelines if we can meet if it
[2:05:46]
does if the information is already
[2:05:48]
available you've mentioned you've looked
[2:05:49]
at this u it does not uh like I said
[2:05:53]
take too much of our budget that we have
[2:05:55]
and the timeline uh I'll include that as
[2:05:57]
number four
[2:05:58]
>> well then then I suggest if we add the
[2:06:01]
size room storage as well into number
[2:06:03]
three and then but make it to achieve a
[2:06:06]
budget for uh the following three. I do
[2:06:09]
have a procedural question for staff.
[2:06:10]
Like since we just voted down the exact
[2:06:12]
motion, like should it it appropriate to
[2:06:14]
include this in in this motion now? And
[2:06:18]
>> um if I may, we're in committee, so this
[2:06:20]
has to be endorsed by council anyway. Um
[2:06:23]
and I think it's fair because it's kind
[2:06:26]
of a scope thing. So if it's all four of
[2:06:28]
those things, again, our plan is to work
[2:06:30]
with KWL to confirm that whatever
[2:06:32]
priorities you vote on as a council,
[2:06:35]
>> that that's within the budget. and if
[2:06:37]
not come back and tell you what
[2:06:38]
additional budget might be needed.
[2:06:40]
>> Thank you to clarify that would be the last of the priorities in case we
[2:06:43]
are not in the budget that should be
[2:06:45]
excluded if you're not able to get in
[2:06:47]
the budget with sidestream storage.
[2:06:51]
» It would it would be based on all four
[2:06:53]
of those things if that's okay because
[2:06:56]
that's just
[2:06:57]
>> if all four of those things.
[2:06:59]
>> Okay,
[2:07:01]
>> I'll second that. Okay,
[2:07:04]
thank you.
[2:07:07]
Everybody know the motion that's on the
[2:07:08]
farm?
[2:07:11]
>> Yes, you do. Or you want to
[2:07:14]
>> just a question through yourself to
[2:07:16]
staff if I may. Mayoring your motion.
[2:07:18]
>> Are these um are these new RFPs or
[2:07:21]
they're going to be within the current
[2:07:24]
contract with KWL?
[2:07:26]
>> If I may, I think we can sort that out
[2:07:27]
before the council meeting. Um it
[2:07:29]
depends on what council's intent is. We
[2:07:31]
have current budget and a current amount
[2:07:33]
allocated for phase 2. um we would have
[2:07:36]
to work with KWL to make sure that that
[2:07:37]
whatever you're asking is within their
[2:07:39]
expertise and within a reasonable time
[2:07:41]
frame and that it's work they can do. Um
[2:07:44]
so it's not really a definitive
[2:07:46]
decision. Um council is basically voting
[2:07:48]
on the priorities and they're going to
[2:07:50]
get them costed and come back to you.
[2:07:53]
>> Does that work? Okay. All those in
[2:07:56]
favor?
[2:07:58]
Thank you. And those opposed? Councelor
[2:08:01]
Gren is opposed. Thank you. Carries.
[2:08:05]
Maybe it can go now. I don't know. I'd
[2:08:07]
like to ask for a mo a motion to
[2:08:09]
adjurnn, please. Uh moved by councelor
[2:08:11]
France, a second by councelor Wood. All
[2:08:13]
those in favor? Thank you. Committee is
[2:08:16]
now adjourned. Thank you.