[0:09]
Good morning everybody. It is Friday,
August 24th, 2026. This is a regular
[0:14]
meeting of the commissioners of City Roa
Beach. We're live in city hall
[0:18]
commissioners room, second floor of city
hall. Like to call this meeting to order
[0:21]
at exactly 2 o'clock p.m. Would you
please rise and join me in the pledge of
[0:26]
allegiance?
[0:29]
I pledge algiance to the flag of the
United States of America and to the
[0:35]
republic for which it stands. One nation
under God, indivisible, with liberty and
[0:41]
justice for all.
[0:52]
Uh in l of roll call, we'll uh let the
minutes reflect that all seven of the
[0:57]
mayor and commissioners are present.
Therefore, we have a quorum and are able
[1:01]
to formally conduct business today. Uh
uh the my u
[1:09]
folks aren't here from uh the ovarian uh
society, so we're going to do them
[1:15]
later. Uh there is no correspondence uh
relating to agenda items. Uh with that
[1:22]
we're moving on to approval of minutes.
Uh we have listed in the agenda 11 sets
[1:27]
of minutes. However, we are uh just
approving nine sets of minutes today. We
[1:32]
are omitting two sets of minutes. Those
sets of minutes uh not being voted on
[1:37]
tonight are March 15, 2024
and August 16, 2024.
[1:44]
With that, there's a slate of nine uh
remaining minutes uh for approval. Are
[1:50]
there any corrections to those nine sets
of minutes? [snorts] Uh if not, I'll
[1:55]
take a motion to approve the nine sets
of minutes uh that I identified.
[2:01]
» I would make a motion to approve the
minutes as follows. The executive
[2:06]
sessions held on July 30th, 2026 and
August 12th, 2026. Regular meetings held
[2:12]
on April 19th, 2022, February 16, 2024,
April 19th, 2024, and July 17, 2026.
[2:23]
Special meetings held on July 30th,
2026, and August 12th, 2026.
[2:30]
Workshop meeting held on October 6th,
2025.
[2:36]
» Second. We have a motion and a second to
approve nine sets of minutes uh noted on
[2:42]
the agenda and uh articulated by
Commissioner Good.
[2:45]
» Oh, Mr. Mayor, a question because I have
received all those minutes except I'm
[2:49]
worried I never received August 12th,
2026, that special meeting as that and
[2:54]
that was sent. I s
>> Yes, it was.
[2:57]
» Okay. I've seen all the others.
>> You can choose to vote or not. Well,
[3:02]
» with that, uh, we'll call the, uh, we'll
just do a, a group call. Those in favor
[3:07]
of approving the nine sets of minutes
identified tonight signify by saying I.
[3:12]
I. Those opposed
>> abstain. I need to look for the August
[3:17]
12th minutes, which I haven't seen.
>> So noted. Thank you very much. The, uh,
[3:22]
with that, the, uh, nine sets of minutes
are approved. Uh, we move on to city
[3:27]
manager report. Taylor.
>> Thank you, Mr. Mayor and commissioners.
[3:30]
Good afternoon. And I want to provide a
quick update on Grove Park. Yesterday,
[3:34]
Save a Tree came out and began pruning
and they will be back next week to begin
[3:38]
removing the five trees that were
identified for immediate removal.
[3:42]
Insecticide treatment will also be
applied to try to kill and stop the
[3:46]
spread of the bacterial leaf scorch. We
truly appreciate city arborist Mike Lily
[3:51]
and parks and recreation coordinator Tim
Bamforth for their quick response and
[3:54]
ability to get the work underway so that
we can reopen the park as soon as
[3:58]
possible. The situation may have thrown
us all for a loop, but I do want to take
[4:02]
a moment to thank everyone involved in
the relocation of the farmers market to
[4:05]
the convention center parking lot. Pat
Kuzi first for her ability to quickly
[4:10]
organize the setup and configuration of
the market in an entirely new space. And
[4:14]
also to our parking department, police
officers, public works department for
[4:18]
coverage, signage, setup, and cleanup,
and city hall staff for their
[4:21]
flexibility when it came to actually
parking. It was a great event here on
[4:26]
Tuesday, and we look forward to having
everyone back next week. and for the
[4:29]
foreseeable future until we have a
better idea of uh what's happening with
[4:33]
Grove Park. Also, speaking of Tim
Bamfor, while I was out walking the
[4:37]
other day, I was excited to see him
watering the trees at Lake Gerard with
[4:40]
our newly repaired water tank and pump,
uh which will make that job much easier
[4:44]
and more efficient. Quick reminder that
due to Labor Day, our next mayor and
[4:48]
commissioners meeting will take place on
Tuesday, September 8th at 9:00 a.m. And
[4:53]
finally, we are pleased to announce that
earlier this week, the charter changes
[4:56]
were approved and signed by the
governor. I'm here for any questions you
[4:59]
may have.
>> Any questions of the city manager?
[5:02]
» Mr. Mayor,
>> commissioner. Good.
[5:03]
» Two questions. Firstly, because um we
have never been given a an accurate
[5:10]
figure for the Connelly Gallagher uh
investigate investigative report that
[5:16]
was done on the takeover. You said to uh
a reporter that it was more than 25,000,
[5:22]
but we never got any sort of real
estimate. Um that's my first question.
[5:27]
Do you have one?
>> Um I don't think we have the final bill
[5:30]
from that, but I will check and I'll
send it out.
[5:33]
» Okay. My second question is one I've
asked you by email repeatedly. There was
[5:37]
an unusual um 12.5% raise for one of the
highest paid employees in city hall um
[5:45]
under a contract from May of 2025. I'd
like to know the current how that was
[5:50]
handled because I've asked you
repeatedly and you have refused to
[5:54]
answer as to whether that you know you
at one point said well it would have to
[5:58]
go for a vote before the board and at
that point it hadn't and it still
[6:02]
hasn't. But I'd like to know the status.
>> Yeah, the status is that did not take
[6:06]
place.
>> Okay. Thank you.
[6:10]
» All right. Thank you. Anybody else? Uh
we're going to move right along. City uh
[6:15]
solicitors report. Lisa,
>> no report, mayor.
[6:18]
» All righty. With that, we'll move on to
the department report. Uh as you can see
[6:24]
uh there are uh support documents
embedded electronically in the agenda
[6:28]
from the alderman's court bullying and
licensing police department. Uh so we're
[6:33]
going to move right on to the uh
[clears throat]
[6:36]
» uh yes
>> excuse me if I may.
[6:37]
» Commissioner Gossip.
>> Uh yes since we have the police chief
[6:40]
here I was just curious. We've had the
installation of the new stop signs along
[6:43]
Colombia and State Road. Um could you
have any comments on enforcement in that
[6:48]
area or what's been going on? I
appreciate it.
[6:53]
[clears throat]
[6:58]
» Yes, since the um stop signs have gone
in both locations, the additional um
[7:02]
there has been some enforcement. We've
had officers sitting there um trying to
[7:06]
use a lot of discretion and given a lot
of warnings. There was um there's been a
[7:10]
few citations um issued. Um, one was
from a crash there at stayed in Mson and
[7:16]
person was at at fault and um didn't
realize there was a stop sign there and
[7:20]
and went through it caused an accident
and all. Um but so they seem to be going
[7:26]
well and um we are getting feedbacks
from some um residents and all some
[7:32]
positive some negative but um that has
to you know that happens and we have red
[7:36]
flashing lights for at night and all to
make sure um people understand that it's
[7:41]
new fourways are always stop signs. So,
I think it's going well, but yes, we're
[7:45]
we are monitoring that. And I know
officers were out there on both streets
[7:49]
today, state and Colombia, just um
watching the stop signs.
[7:54]
» I did notice uh that on the state road
there are, as you'd mentioned, the red
[7:59]
red blinking [clears throat] lights at
night, but I don't see those on
[8:01]
Colombia. Is there an opportunity to
install those on Colombia or is there a
[8:05]
question about that? Uh that'd be up to
city manager, but I we certainly can and
[8:10]
probably should get in a habit anytime
we add something new for at least for
[8:14]
temporarily um you know 30 days, 60 days
to um let people know that it's it's
[8:20]
kind of the trend now. I'm seeing that
the municipalities in a state, but city
[8:24]
man.
>> Yeah, we would have to order them, but
[8:25]
we certainly can. Yeah, thank you. Just
for consistency sake. Thank you.
[8:29]
» Thank you. Uh with that, we'll move on
to the departmental briefing of building
[8:34]
and licensing. uh it's going to focus on
the CDP. Corey,
[8:38]
» thank you. Mayor and commissioners,
uh I wanted to give more of a process
[8:43]
update today rather than a chapter to
chapter update on the CDP. Uh the
[8:49]
five-year CDP work is ongoing and is
moving forward. But a major part of that
[8:54]
work right now is making sure that it's
coordinated with several other planning
[8:58]
efforts that are happening at the same
time.
[9:01]
Uh currently we really have four
interconnected work streams underway. Uh
[9:06]
we've got the 5-year CDP update. We have
the do colon partners commercial zoning
[9:11]
update. We have the chapter 236
um uh subdivision of land site plan
[9:18]
review change of zoning uh rewrite. And
we also have the new zoning map uh
[9:22]
parcelbased GIS work that we're that
we're undertaking. Uh and those projects
[9:28]
can't be treated independently.
So what that means is that a change in
[9:32]
one place can ripple through several
others. Uh depending on the structure of
[9:36]
the new commercial zoning code changes,
we could be changing entire zoning
[9:40]
districts or how those districts are
regulated. That can affect our official
[9:45]
zoning map that can affect our future
land use map portions of the CDP and
[9:50]
some of the site plan review triggers in
chapter 236 among other things. So, the
[9:55]
goal uh right now is um to get not to
get one document out in front of another
[10:01]
one uh and then have to go back and redo
work. Um we're trying to get these
[10:06]
projects operating on the same rhythm so
that as decisions are made, we can
[10:10]
identify all the places affected by that
decision and then update them together.
[10:16]
In the meantime, there's plenty of work
still to be done in the CDP and and
[10:20]
that's what we're working on. That's
where our attention is right now. uh
[10:24]
reconciling and updating demographic and
statistical information, gathering
[10:29]
current data, updating existing
conditions, and continuing the
[10:33]
underlying parcel and GIS work that the
later chapters and maps will rely on.
[10:38]
The next major coordination point will
be the first overall and partner zoning
[10:43]
draft, which we're expecting around
September 8th. Once we have that draft,
[10:47]
we will have a much better understanding
of the form of the commercial zoning
[10:50]
regulations are taking and we can review
that as not just the o ordinance but
[10:56]
against the CDP uh and the future land
use map, the zoning map, chapter 236 and
[11:02]
any other code provisions that depend on
existing commercial district structure.
[11:06]
We'll have to take a full look at
everything that even references C1, C2,
[11:10]
C3 and take a holistic look at that.
From there, the work should become much
[11:15]
more synchronized.
Uh, instead of separately reviewing the
[11:19]
CDP, the zoning map, um, and development
review procedures under 236, we can work
[11:26]
across the documents at the same time
and make sure they're saying the same
[11:30]
thing. So, I would characterize where
we're at right now as sequencing rather
[11:34]
than as pausing any work. Uh we're
continuing the work that can be
[11:38]
responsibly done now uh while avoiding
locking in portions of the plan that may
[11:42]
immediately need to change once the
zoning draft arrives. Ultimately, the
[11:46]
objective is pretty simple. When the
process is finished, the city's policy
[11:51]
document, zoning regulations,
development procedures,
[11:55]
development review procedures, and maps
should all work together as one coherent
[11:59]
system rather than having conf conflicts
between them. Uh with that said, um uh
[12:05]
we will be having a brief update on the
CDP at next Friday's planning commission
[12:11]
meeting.
>> That's where we're at right now.
[12:15]
» Any questions by the commissioners?
Thank you very much. Uh Commissioner
[12:21]
Stewart,
>> um I just wanted to confirm. So after we
[12:26]
get the draft, can you talk about the
where it goes then? Does it go to the
[12:30]
planning commission and then come back
to us or how is that going to work?
[12:35]
» So, the uh anticipated sequence right
now is we'll get the rough draft
[12:39]
September 8th. That gives the city uh
city staff at least a few weeks to
[12:44]
review it and make internal comments on
it. And then we plan on presenting the
[12:49]
draft along with our comments uh and
sharing that draft as well ahead of time
[12:53]
with the members of the planning
commission and the board of adjustment
[12:56]
to be placed on their agendas at the end
of September. The hope is is is after
[13:01]
we've collected all of the relevant
comments um at that point to give them
[13:07]
back to do colon partners as one
consolidated set. They then per uh Joe's
[13:12]
um July 17th uh excuse me June 17th uh
presentation here uh will take those
[13:19]
into consideration provide us a second
draft which is the one that's
[13:24]
anticipated to come before the
commissioners
[13:27]
» in November
>> in if in in a perfect world it would be
[13:30]
in November uh with a possible
consideration to set a resolution to
[13:35]
hold the public hearing in December
which would still leave us with the
[13:38]
timeline of the end of 2026. 6
[13:43]
» Commissioner the
>> Thank you. So just clarification for
[13:47]
public participation, public comments.
So it sounds like just walk through that
[13:51]
again. Sounds like end of September
you'll be presenting back to
[13:55]
commissioners. So that would be an
opportunity for the public to comment
[13:59]
and then in November there would be
another presentation
[14:03]
opportunity for the public to comment
and then in December the official public
[14:07]
hearing is what I think I'm hearing.
Correct. Okay. All right. Great. Thank
[14:11]
you.
>> Anybody else? Thank you, Corey.
[14:14]
» Thank you.
>> Appreciate it.
[14:17]
» Uh we have uh not not received any uh
summaries of uh recent board and
[14:23]
commission reports. So, we'll move right
on. Next item of business, committee
[14:28]
reports, including possible
consideration of approving future
[14:31]
advisory committee agenda topics. Before
we uh turn that over to uh uh city
[14:37]
streets and safety advisory committee
chair Mark Saunders, I would like to say
[14:42]
that as we soon offer opportunities for
public input, uh please wait to be
[14:48]
acknowledged by the chair and given the
floor and when a member of the public is
[14:53]
recognized, then please come to the
center microphone here. Uh state your
[14:57]
name and address or relationship to the
city. Uh, and uh, please be mindful that
[15:02]
everyone gets three minutes so we can
hear from as many voices as possible.
[15:07]
The countdown clock's on the wall above
the monitor. Uh, and we'll beep when uh,
[15:11]
time is up. Uh, thank you very much.
And, uh, we'll turn it over to
[15:16]
Commissioner Chair Mark Saunders.
>> Thank you. Thank you, Mr. Mayor. Um,
[15:21]
good afternoon everybody. We don't have
any official business to present today,
[15:25]
but I did want to give everybody a brief
update on where the advisory committee
[15:29]
is right now. Um in July we participated
in the sharetses and we had a good
[15:35]
number of our members that actively
participated and found them to be
[15:40]
beneficial and the some of the uh
information that we gleaned from those
[15:45]
uh sharetses and the future information
is going to be worked into our plans as
[15:49]
we go forward with things like the bike
path and so forth. So uh just uh kudos
[15:55]
to to everybody for putting those
together and I think they were
[15:58]
beneficial. uh what we're currently
working on and we're in the middle of a
[16:02]
couple of these items. We of course were
asked by the commissioners to look into
[16:07]
the uh possibility or the concerns that
some folks had with the parking uh the
[16:13]
overnight parking being prohibited over
on the east end southeast end of the
[16:18]
city Prospect Queen and parts of St.
Lawrence. And we did have a really good
[16:23]
public meeting at our last meeting. We
had uh I think we had somewhere around
[16:28]
eight or nine speakers. We had numerous
letters. I I don't know to count them
[16:32]
all, but we had quite a few uh
interested people on both sides of the
[16:39]
uh the aisle uh discussing that and what
we could do to make it work for
[16:43]
everybody. And interestingly, right
after the meeting, some of the pro
[16:48]
people and the con people got together
right outside there. And I got some
[16:52]
emails from them all later saying that
they'd like to come to a compromise that
[16:56]
they uh they realized each other's
situations and that uh they would like
[17:01]
to come to a compromise. I'm going to
meet with Mr. Miller before the next
[17:04]
meeting where we're going to continue
those discussions and see if there might
[17:08]
be something in the future that we can
look at as a compromise as we get into
[17:12]
the electronic hang tags and that might
be a possible solution. So just to let
[17:17]
you know that the conversation went
well. It's continuing and I think
[17:21]
everybody was was uh satisfied with with
where we are on on stop signs. Patrick
[17:28]
talked about fourways. We also talked
about some four-ways on First Avenue,
[17:32]
particularly first in Baltimore, first
in Wilmington. You can picture those
[17:36]
corners and you know why we had those
conversations. And again, we had uh
[17:41]
public comment both for and against. Um
we had some good input from the chief.
[17:46]
Thank you, chief. that made us
reconsider. And so rather than bring
[17:50]
them to you now as a uh possibility,
we're looking at further discussions and
[17:56]
making sure that we don't have any
consequences that we will regret later.
[18:01]
So that will be on a future topic, but
it will be continued at the next
[18:05]
meeting. Several other minor items con
uh involving oversized vehicles, we've
[18:11]
decided just to hand over to Mr. etc.
And the the committee thought that was
[18:15]
the best thing to do is is do it inhouse
and not uh not necessarily bring any
[18:19]
changes to the commission. And lastly
today on the ballards um you know the
[18:25]
longer they last the better they look
that's [laughter]
[18:30]
that's sort of what we're getting from
people like all right we're used to them
[18:33]
now. So, I'm not sure we have asked uh
the uh design committee at Main Street
[18:39]
to look at them for us, but um the
interest in designing them has seemed to
[18:44]
wne as they have become more
commonplace. So, more on that later
[18:49]
perhaps, but that's my report for today.
>> Thank you, Commissioner. Any comments up
[18:53]
here? Uh with that, I'd like to go to
the members of the public. This is your
[18:57]
opportunity to uh comment on this
particular topic which would be uh uh
[19:03]
relating to topics
uh brought up by the streets and safety
[19:10]
committee. Anybody?
If not, good job. Thank you, Mark. Uh
[19:15]
with that, uh the next on the agenda is
community partner reports. Uh they are
[19:21]
all embedded in the agenda, so we don't
need to go over that. Mayor
[19:27]
[clears throat]
>> may not to go over it but just a
[19:28]
question gossip. Yes,
>> thank you on the uh uh chamber of
[19:33]
commerce report included in there. Thank
you very much that it seems that we have
[19:36]
an increase in occupancy from last year
to this year on the outlined dates but
[19:40]
also have you included the um beach band
stand performance schedule change
[19:44]
survey. So I'm just curious is if that
will be on a future agenda in the near
[19:49]
future so that can be discussed and
reviewed so we can prepare for next
[19:52]
season.
The
[19:54]
» answer is yes. Thank you. [laughter]
>> Thank you. Thank you for bringing that
[19:58]
up because that uh took a lot of effort
the survey and again it is embedded
[20:03]
electronically in the agenda and uh
while Dan from Main Street's here and
[20:07]
Kate's from here I want to thank you all
because I know it's time consuming to uh
[20:12]
put these reports together but uh we're
uh we don't want you to think that we uh
[20:16]
just merely gloss over them. You know
that they are there and available to the
[20:21]
public. So thank you very much. Uh with
that,
[20:27]
the next item of business is uh actually
uh new business. A discuss and possible
[20:34]
consideration awarding a contract to
Mumford and Miller Concrete for the
[20:39]
annual street paving and water mane
replacement project. Henry,
[20:45]
» uh,
I was giving the people a little more
[20:49]
time to show up, so I'm gonna
>> Okay,
[20:52]
» we'll do that by by here.
>> No, it's not.
[20:58]
» Afternoon. Go ahead, Mayor and Mayor and
commissioners. So, I'm here to present,
[21:02]
as you said, the FY27 annual street
paving and water main replacement copy
[21:07]
uh project. Uh, have a copy of the bid
evaluations. We'll go over the area, the
[21:13]
work to be done, answer any questions,
and then request uh a motion for
[21:19]
approval.
[21:23]
[clears throat]
[21:27]
We we had 10 contractors asked for the
bid package when it was advertised and
[21:34]
four uh chose to bid. We actually had
the same four as last year. And
[21:44]
if you take a look at the engineering
estimate, it's uh in between right in
[21:50]
the middle of the bids, which which is a
good thing. Uh Mumford and Miller was
[21:54]
the lowest responsible and responsive
bidder for the third year in a in a in a
[21:59]
row. Um so, you know, they've been great
to work with the last two years. their
[22:06]
change orders have been minimal. They've
been responsive with things. Uh,
[22:10]
example, Commissioner Gossa, I remember
last year you asked me to get a sidewalk
[22:14]
taken care of quickly and um it put them
out a bit. They obviously got paid for
[22:21]
it, but they did take care of that right
away for us. So,
[22:27]
um,
[22:30]
here's the areas to be worked on.
the it's the green shaded area. It's
[22:36]
[snorts] Kent Street between third and
fourth. It's going to be water main
[22:39]
replacement.
Um service lines as well as the paving
[22:44]
obviously. Kent uh Sussex between third
and fourth, it's the same with the water
[22:49]
mane replacement. And Sussex between
fourth and fifth, it's the service lines
[22:56]
and the and um the paving. And then if
you see on the bottom across Silver
[23:02]
Lake, Silver Lane is on that that kind
of came came as an afterthought where I
[23:08]
received a couple calls from residents
about it. Went and took a look at it. It
[23:13]
was pretty the the the paving index
score was actually pretty low on it.
[23:19]
Thought we'd be under budget on it. Uh
which we were about $200,000 even with
[23:24]
that. So, we uh added that and that will
just be uh paving and service lines.
[23:34]
So, here is the I'm not going to read
all the numbers, but there's the
[23:37]
engineers estimate uh 922,000 and then
uh the two highest bids were George and
[23:43]
Lynch and HC.
Um Adel was just over 800,000 and
[23:49]
Mumford Miller at 724,000.
Uh this is the second year in a row HC
[23:57]
has bid for this and I think for the
past like five years prior four or five
[24:02]
years prior it was the three Adel George
and Lynch and Mford and Miller.
[24:10]
Are there any questions?
>> Any questions of Henry?
[24:15]
» Nope.
>> Okay. Uh so what I'm uh request board
[24:20]
action to award the FY27 street paving
and water main replacement project to
[24:26]
Mumford and Miller in the amount of
$724,388.
[24:31]
» There is a proposed motion in the agenda
item report if anybody wants to use that
[24:36]
as a template.
>> Mr. Mayor,
[24:38]
» any
>> Oh, I'm sorry. Commissioner Galante,
[24:42]
» I was just going to go ahead and make
the motion, but I'm not sure if you
[24:46]
wanted to take it back and open up for
comments.
[24:49]
» No. Do does anybody have any
>> comments before a motion's made?
[24:55]
» Just um to confirm, in past years when
we've been doing this, we've also
[24:58]
reached out to the homeowners along
those streets for additional repair of
[25:02]
their uh laterals and what have you.
That be the case again?
[25:05]
» Yes. Uh we have have letters ready to
go. uh assuming he gets approved, I'll
[25:10]
send him out Monday. Um there aren't
many there isn't any sidewalks in that
[25:16]
area. We will be doing some curb
replacement u on that and there are
[25:22]
several laterals. We will be also about
10 or so suspect laterals on those three
[25:29]
uh three streets and we we will be
sending letters to those homeowners.
[25:33]
Last year we actually had quite a few
take advantage of that on Mson which was
[25:36]
great.
Are there any other questions?
[25:40]
Commissioner Galante.
>> Thank [clears throat] you, Mr. Mayor. I
[25:44]
make a motion to award the bid for
fiscal year 2027 annual street paving
[25:50]
and water main replacement to the lowest
responsible and responsive bidder,
[25:55]
Mumford and Miller, Inc. in the amount
of $724,388.
[26:01]
» Second. Uh we have a motion and a second
to award the bid for uh annual street
[26:07]
paving fiscal year 2027 to Mumford and
Miller as noted. Is there any further
[26:12]
discussion?
[26:20]
Hold on.
>> Public comment on new business.
[26:25]
» Oh, I'm sorry. I'm [clears throat]
sorry. I'm sorry. Uh is there any
[26:28]
members of the public who would like to
comment?
[26:33]
If not, we'll come back to the table.
Uh, any further discussion? We have a
[26:37]
motion in a second. All those in favor
signify by saying I. I. Those opposed.
[26:42]
And the motion carries unanimously.
Thank you very much, Henry.
[26:45]
» Thank you. Uh, with that, we'll move
into new business item B, discussing
[26:50]
possible consideration of an agreement
between the city of Rhovitz Beach and IQ
[26:56]
Fiber for the installation of a fiber
optic broadband network in the city.
[27:02]
» Thank you, Mr. Mayor. Um, good
afternoon. So, I wanted to provide a
[27:05]
little bit of background about how um,
IQ Fiber has uh, came to us. Um and then
[27:11]
Lisa will provide some information and
then um the folks from IQ Fiber are here
[27:16]
and they'll give you a presentation. Uh
so the governor's office uh reached out
[27:21]
to me um several months ago um because
IQ Fiber was added to by Governor Meyers
[27:28]
um um jobs first permitting accelerator
on June 11th, 2026. And so that was
[27:35]
established via executive order 18. And
the permitting accelerator coordinates
[27:40]
and expedites state agency review of
high priority housing, energy,
[27:44]
broadband, and water, sewer projects
through a single point of contact and
[27:49]
parallel review. So they're part of that
um program with Governor Meyer. Um and
[27:55]
ultimately they are looking to increase
the high-speed and high reliability of
[28:01]
fiber in Sussex County, um including
Rahobit Beach. Um, so I'll go ahead and
[28:07]
turn it over to Lisa.
>> Thank you. Um, yes. Um, as Taylor points
[28:12]
out, um, IQ Fiber came to us through the
governor's office and we've worked with
[28:16]
them to, um, negotiate the contract that
you have in front of you. The way, um,
[28:22]
we have approached this is that, um, IQ
Fiber is now working with about 15 to 20
[28:27]
different municipalities. And so um we
took this contract and looked at it from
[28:32]
the perspective of what is uh rights
away that are controlled by the city of
[28:37]
Rahobit versus those that are controlled
by the state of Delaware. At present um
[28:41]
IQ Fiber has the authority to go into
state rights away which includes roads
[28:46]
in in the city of Rahobit. And so we
looked at it from the perspective of
[28:49]
protecting our rights of way and what we
could do um to best make sure that we
[28:54]
were protecting what we could from the
city. Um, this is a contract that has
[28:58]
been negotiated with both parties and
we're presenting it to you today for
[29:01]
your consideration.
>> Thank you very much.
[29:04]
» Mark, would you like to continue?
>> I would. Hey,
[29:06]
» could you introduce yourself if you
>> Thank Thank you. U, mayor, council, I'm
[29:11]
Mark Wagner. I'm vice president for new
markets for IQ Fiber. I'm joined today
[29:15]
by our director of operations, David
Enley. David Enley runs the entire co uh
[29:20]
construction operation for what we call
the Chesapeake region, which includes
[29:24]
our Delaware project. So he's he's here
to answer questions specifically towards
[29:30]
um construction and construction uh
methodology. Uh again we're IQ Fiber. Um
[29:36]
we are a high-speed fiber optic
broadband network. We build and operate
[29:41]
the network and we are currently located
in five states um Georgia, South
[29:47]
Carolina, Florida, Maryland and
Delaware.
[29:52]
We when we look for a new market, we
look to be what we call first fiber,
[29:56]
which means we look for markets where
there is not currently a fiber optic
[30:00]
provider in this area. Most of us would
recognize for instance like a Verizon
[30:04]
FiOS uh maybe specifically to Lewis uh
Glow Fiber. These are these are
[30:10]
companies that do something similar to
what we do. We don't have any interest
[30:14]
in overbuilding them. What we look for
and what is illustrated in this um image
[30:18]
above are cable areas that have
predominantly cable infrastructure,
[30:24]
predominantly cable infrastructure that
is fairly dated. And we see that through
[30:28]
the use of upload speeds because that's
where cable traditionally
[30:34]
um shows a big difference in performance
than with a a full fiber optic network
[30:39]
which gives the same speeds up and down.
We call that symmetrical speed. So, what
[30:43]
that image is showing is upload speeds
from um uh from Delaware, uh a lot of
[30:51]
Sussex County, and you can see the lower
sort of the the greens and the blues,
[30:55]
and though that represents slower upload
speeds. So, that's that's one of the
[30:59]
things that we look at when we target
new markets and that and we definitely
[31:03]
see that here in Sussex County. So we're
excited to um to help um you know give
[31:09]
these people an option and symmetrical
speeds.
[31:13]
Uh so I think everybody understands it
but fiber optics is speed fiber it is
[31:19]
broadband at the speed of light. We we
operate on lasers. Um it does provide
[31:23]
symmetrical speeds. Symmetrical speeds
have become very very important in our
[31:27]
lives that that those are the speeds
that give us the right reliability when
[31:32]
we're doing things like teams meetings
where we're working at home. 40% of us
[31:36]
now work full or part-time at home.
These are your medical devices. These
[31:39]
are your connection from your your
business or your premise to the
[31:43]
internet. Um so those upload speeds are
very important. They're increasing at
[31:47]
least 18% last year and probably more
this year. So our our network our fully
[31:52]
fiber network will will provide
symmetrical speeds. We have our research
[31:59]
shows us that a fiber connection to a
premise can have a positive um increase
[32:04]
in equity value maybe even up to 3.1%.
The uh our our story here in Delaware is
[32:12]
uh is a good one. Um, as was mentioned,
we were the the initial uh company that
[32:19]
uh made it through the priority um
priority permitting system. Governor
[32:24]
Meyers uh executive order 18. We are the
initial company. We had a kickoff with
[32:29]
the with the governor [snorts] two
months ago and a round table and a press
[32:33]
event. And we are very committed to uh
this process. We are very committed to
[32:38]
Delaware. Our investment in Delaware is
between 150 and $160 million. We're
[32:44]
going to be building 4,000 miles of
brand new fiber optic network, probably
[32:49]
twothirds of which here right here in
Sussex County. If there is a community
[32:54]
of note in Sussex County, we're having a
similar conversation with them at the
[32:58]
moment from Seafford all the way here
all the way down to the Maryland border.
[33:02]
So, it's a it's a big comprehensive
project. We're extremely excited to be
[33:06]
aligned with the governor and his
priorities in terms of bringing this
[33:09]
type of infrastructure and all of the
economic benefits that come with it.
[33:15]
Um I'm going to Dave I think this is
this is I I'll just start that this is
[33:20]
uh cabinet this is an active cabinet
when we build our network fiber optics
[33:25]
is a pass is mostly a passive medium for
transporting internet but there is some
[33:31]
electric in it. So this is a big
difference with cable which is a which
[33:34]
is largely a giant metal antenna with um
a lot of electric and repeaters
[33:39]
everywhere in it which is means when you
have a power failure anywhere in your
[33:43]
cable system you have a power failure
and everything's down. Uh in our system,
[33:47]
we have a a cabinet like that that we're
showing right there. That'll uh service
[33:54]
approximately 5,000 customers. And that
is you can see that that is powered.
[33:59]
That will have a generator and battery
backup. That feeds passive cabinets,
[34:04]
meaning no power. And those can handle
two to 500 customers. And then the
[34:09]
equipment in the home needs to be
plugged in. Um but so from that cabinet
[34:14]
to your home um it's it's a passive
network.
[34:21]
And Dave, do you want to talk a bit
about
[34:25]
Yeah. Hello everybody. Um so our
construction process typically begins
[34:29]
with obtaining all the necessary uh
permits from the uh controlling
[34:33]
municipality whether it's TEDOT or in
this case uh the city of Rhobith. Um
[34:38]
once we obtain those permits, our
pre-construction process will begin with
[34:43]
um our crews will uh deploy
pre-construction door hangers to uh
[34:48]
notify the uh the residents that we're
passing of the construction process. It
[34:52]
also um supplies a direct link to us for
um for direct communication for any
[34:58]
questions or concerns um you know before
the construction process or during the
[35:02]
construction process as well. So they
can reach us directly. We have um a
[35:07]
dedicated uh construction coordinator on
site that will meet with uh anybody that
[35:12]
has any questions or concerns, address
their concerns uh directly during the
[35:16]
process or or in front of the process as
well. Um also a part of that pre
[35:19]
pre-construction process is we will
enter all uh miss utility notifications.
[35:25]
Um once those uh those tickets are
complete, we'll review them uh make sure
[35:31]
that everything's set and ready for our
crews to to deploy at that point. Uh the
[35:36]
next step would be the actual
construction process. So first step in
[35:39]
the construction process will be uh test
pitting. Oh, I'm sorry. Here's a
[35:44]
screenshot of the pre-construction door
hangers. As I just described, you can
[35:48]
see it has a um Q QR code that would uh
provide that direct communication back
[35:52]
to us. Um I think a lot of instances
goes straight to our construction
[35:56]
coordinator that's local to the location
and then come right out and meet with
[35:59]
the uh the resident in that regard.
Uh
[36:04]
here's u more information on the actual
construction process as I described
[36:08]
pre-construction process um door
hangers, mis utility call outs. Once
[36:12]
those are complete, our um crews will
begin the process with performing test
[36:16]
fitting on the existing utilities so
that they're protected during our
[36:19]
installation methods. Um we try to be um
underground as much as possible because
[36:24]
it protects our infrastructure um much
better than being on the on aerial pole
[36:29]
lines. Um so before we can do that we
need to test pit protect the existing
[36:34]
utilities. Um that way when we uh
install our conduit system which our our
[36:39]
installation method is with a
directional bore or pneumatic missile
[36:42]
that'll be subgrade. Um we don't open
cut we don't open trench. So the uh the
[36:47]
impact to the soft surface is is
minimized as much as possible. Um
[36:53]
there are certainly a lot of areas
within the city that there is no soft
[36:56]
space. where we have to utilize aerial
infrastructure where where those
[36:59]
locations are are necessary. Um
[37:05]
so during during that process with the
crew placing uh the conduit underground
[37:09]
we move it approximately a pace of a
couple hundred feet to even a couple
[37:12]
thousand feet per day. Kind of depends
on uh the cleared miss utility tickets
[37:15]
and the amount of utilities that are
underground that we need to protect from
[37:18]
the process. Uh during that process
we'll um we'll install our conduits and
[37:24]
our flush grade vaults. Uh Mark
described one uh above grade uh cabinet
[37:29]
that will service pretty much this
entire area. So as far as uh any above
[37:34]
ground infrastructure, you really won't
see that. Everything's essentially flush
[37:38]
to the ground. You'll see um a very
small, we call them handholds, but
[37:42]
they're um a small lid for us to access
to be able to terminate and provide
[37:46]
service to uh any customer that that
requests service at that time. Um, and
[37:50]
you'll see those approximately like
every other house in the in the areas
[37:53]
where we can perform uh soft space
installation. Um, so within those a
[37:58]
couple thousand feet a day, the crew
moves pretty fast. We'll install the
[38:01]
conduit, install the the handholds,
we'll move on. So the impact from on a
[38:05]
daily perspective is is moving very
quickly from street to street very
[38:08]
quickly. So you won't see um you
shouldn't see repeated u disturbance on
[38:13]
a specific street or specific area in
multiple days. Usually one day move on
[38:17]
in in a very successive manner. Um once
that underground infrastructure is in
[38:21]
place, the conduit handle instructions
in place, the next step is to pull the
[38:24]
the fiber cable through those conduit
systems. Um that usually takes about a
[38:27]
day or so. Um then once the cable is in
place, we test it, verify it's
[38:32]
sufficient for uh for service deployment
and then we'll be able to uh release
[38:37]
that for for order taking and uh and
service installation for uh subscribers
[38:42]
at that point.
>> Um is that it? I'll take
[38:48]
» um so a couple things that distinguishes
IQ Viiber and one in particular we know
[38:53]
that we're the only company in our
industry at our size and scale that runs
[38:58]
our very own customer contact center
that means that when you call IQ Fiber
[39:03]
with an issue with construction or
question about your service um you're
[39:08]
experiencing any kind of issue a human
being will answer the phone and that
[39:13]
human being it exists today in our uh
headquarters in Jacksonville, Florida.
[39:18]
Um and our average call to answer time
is 19 seconds. You can also um contact
[39:26]
by text, but same thing. It's not going
to you're not having an AI experience
[39:30]
anywhere in the mix. It's your it's a
real honest to god human being. We do
[39:34]
embed AI in the mix, but that only gets
involved because it'll allow the person
[39:39]
that you're talking to know who they're
talking to, where you're located, and if
[39:44]
our equipment has noticed any issues,
all of that will be on their pane of
[39:48]
glass. So, we and we do know that's that
is an expensive way to do business um to
[39:53]
run a call center. But the the thing
that we have decided from day one where
[39:58]
and yesterday was our 5-year anniversary
uh was that we were going to be um the
[40:03]
anti-cable company and from day one till
day now that is uh that commitment is
[40:09]
held and and obviously we have proven
that with and by doing that we now have
[40:14]
one of the highest uh customer service
ratings in the industry. that's done by
[40:20]
um there's a net promoter score which in
our industry we have about an 80 which
[40:24]
is that's very very good and for Google
we mostly we ask for reviews on Google
[40:30]
and they're 4.8 to 5.0 you know, so
we're very proud of that. We work for
[40:34]
that every single day. Um, again, this
is, um, back to Dave, you know, and and
[40:40]
and this is the I'll just emphasize
that, um, as Dave said, uh, we're in and
[40:45]
out as quickly as possible. What we
disturbed, we will fix. It will be as
[40:49]
good as before we came. Um, if it isn't,
then, uh, we invite you to call us and
[40:55]
we will fix it. And it's an opportunity
for us again to prove that we um uh will
[41:00]
listen that we do communicate. We listen
we need to earn every bit of business
[41:05]
that we have. It starts with the
construction progress process. If we
[41:08]
make emmonities we're not going to make
customers, right? So um we uh you have
[41:14]
my commitment here. You have Dave's
commitment that this will we will work
[41:18]
with the community to make sure that we
leave things as good as we found them.
[41:23]
Um I I think I went through all of this.
The you know I started with the contact
[41:27]
center. The last thing I'd like you guys
to know about what makes us different.
[41:30]
Um we don't have any contracts. Um we
have transparent pricing. So what you
[41:36]
see is what you get. It will be one
price. It does include everything. And
[41:39]
that includes the Wi-Fi equipment. There
is no rental. And the Wi-Fi equipment
[41:44]
that we use is state-of-the-art Wi-Fi 7.
It does match with our five speeds. what
[41:50]
we will build day one to the the
residents in Rahobitth will be up to 10
[41:55]
gig capacity. We only have a package up
to five gigs. That's because we can't
[41:59]
Wi-Fi doesn't support anything more than
5 gigs, but when it does, we'll offer a
[42:03]
10 gig pro um package as well to our
customers. So, it's it's it's um
[42:09]
contract free um and you just pay for it
monthto month. If you don't like us, if
[42:14]
we haven't earned your business, then
that's it.
[42:17]
Um, these are our prices today. Um, from
$65 to $125 for 5 gigs of bandwidth,
[42:25]
which is an enormous amount of
bandwidth, but it's it's real. That is
[42:28]
the capacity that you'll have in your
house. Um,
[42:33]
we do businesses. Um, these are what we
call our small business prices. These
[42:37]
would be, you know, sort of your um,
what you see along here on the your mom
[42:41]
and pop businesses. We also do and we we
support a much much larger businesses
[42:45]
and have various products for those DIA
and others. But for purposes of your um
[42:51]
typical business here in Rahobitth,
that's that's what we would we would
[42:55]
charge.
Um we're uh we we've talked about the
[43:01]
Delaware story. Our backing, our main
backer is SEC Capital. They are a a a an
[43:07]
infrastructure fund, one of the largest
in the country. All they all they fund
[43:11]
is infrastructure and um we're one of I
think three platforms and we're one of
[43:16]
their largest platforms. Our banking
partners JP Morgan Chase, all of the
[43:21]
money for this project and all of
Delaware has already been booked
[43:26]
and that's it. Any questions?
>> Um
[43:32]
I believe I heard you indicate that some
of the uh lines might be aerial and some
[43:37]
underground. Is that is that what you
said?
[43:40]
» Yeah, that'd be accurate. Where where
there's not sufficient uh soft surface
[43:43]
space for us to install within the uh
the approved rightway. Uh we may need to
[43:47]
utilize aerial infrastructure to uh to
service those customers along the
[43:51]
» I I just want to share I guess with the
city manager primarily uh that uh that
[43:58]
my my ideal would be that there is no
aerial uh lines that are all put
[44:04]
underground.
Uh and uh also my ideal would be anou or
[44:11]
some kind of clause that indicates that
if in the future
[44:16]
uh we do underground any utilities uh
part particularly in the commercial area
[44:22]
or something uh that they need to
relocate uh um put them underground at
[44:28]
their own expense. So, I don't know if
that fits in there, but I'm trying to be
[44:33]
anticipatory into the future uh and u
make sure that uh we accommodate
[44:40]
ourselves in first place. Uh is there
anybody else? Commissioner Stewart,
[44:46]
» I have a couple questions and a comment
and I have a question for the solicitor,
[44:50]
but um thank you and you seem like nice
gentlemen. You know, we had a little
[44:54]
hiccup where your crew started on a city
street. It happens to be my street and
[44:59]
and a a a woman found her right ofway
being dug up. So I guess that was a
[45:05]
little bit of a you know it was
something we didn't ask for we were
[45:09]
getting and um
>> uh is it correct that the only digging
[45:14]
will be on in the right of way?
>> Yeah, that's correct. Unless we obtain a
[45:19]
road of entry from that specific
property owner. Yeah, we would only stay
[45:23]
within the the permissible right ofway
>> and the handheld is only when they
[45:27]
subscribe to the service.
>> Uh the the the handholds are a part of
[45:31]
the the permanent infrastructure
>> in the right of way.
[45:34]
» Within the rightway, correct? Um they're
set in a way that uh any specific
[45:39]
resident who subscribes,
>> we would not need to traverse another uh
[45:44]
neighbor's property to to access them.
>> Okay. And then um I guess lastly just
[45:51]
for context, we we as a city don't have
a right to say we don't want this. Is
[45:56]
that correct?
>> That is correct.
[45:58]
» Thank you.
>> The only thing we can do is govern how
[46:00]
it is they exist.
[46:06]
» Chris, Commissioner Galani, and then
Commissioner Saunders.
[46:10]
» Thank you, Mr. Mayor. Um a couple of
questions for you guys. Um, first of
[46:14]
all, um, can you tell us where the hub
cabinet location will be?
[46:21]
» I I have to look at the engineering to
to pinpoint that exactly for it, but I
[46:24]
can get you that information. Um,
>> it looks like it's a relatively
[46:29]
large structure.
>> It's approximately Yeah,
[46:33]
» like like a bit of a smaller mediumiz.
>> I'm sure most of our city residents
[46:37]
wouldn't be too happy if it appeared in
front of their house. Yeah, it would be
[46:40]
it would likely be within a delta out
right away location um outside of the
[46:44]
the residential area. Certainly
>> that that's my point and my hope is that
[46:48]
it would be in a commercial district and
somewhere that it's not going to be a
[46:51]
nuisance for for neighbors.
>> Yeah, we typically place it more in like
[46:56]
a hightra area. Um
>> Okay.
[46:59]
» But we'll we can get that specific
information for you if you like. Uh
[47:02]
» thank you. I I would like that. Um
absolutely and appreciate that. Um and
[47:05]
then the second question that I have is
um how many passive cabinets are there
[47:08]
going to be and what are the locations
of those?
[47:11]
» Uh same thing like one passive cabinet
typically uh services approximately 7 to
[47:16]
800 homes. Um I think Mark was a little
bit short on on the number there. So
[47:20]
once again um that's a pretty pretty
dense area. Um so you won't see them a
[47:26]
lot of places and those are much
smaller. They're they're kind of like uh
[47:29]
I think they're about maybe three foot
high by like two foot wide,
[47:33]
» but those will be in the residential
district.
[47:35]
» They they would probably be somewhere
located within those more centralized to
[47:38]
to those areas within the the 700 home
groupings. Correct.
[47:41]
» I'd appreciate getting the locations of
those as well.
[47:43]
» Yep. We'll get you those.
>> Um great. Next question is what is the
[47:46]
trench depth for the for the uh wire?
>> We we typically go between two to three
[47:52]
foot deep. Um, usually it's dictated by
the uh the pering mun uh the peritting
[47:57]
entity whether it's Dell DOT or um or
the city itself. A lot of public works
[48:02]
uh teams like us to be just above the uh
the water and sewer infrastructure. So
[48:06]
they like us to live somewhere between
that two foot range give or take
[48:09]
depending on how the services are are
run to the houses at that point. So we
[48:13]
recently went through um experience with
um power line cutting by uh the power
[48:20]
company and the a lot of our tree canopy
was um negatively impacted. So I'm just
[48:26]
concerned about the the roots in the
trees and
[48:31]
» um it would be you know who who do you
contract the work out or is it is it IQ
[48:40]
Fiber that's actually doing the
installation? you know, we we have
[48:43]
contractors that do the work for us
under our direct supervision.
[48:46]
» Yeah, it would be helpful for us to be
able to have an opportunity to
[48:49]
communicate with them to make sure that
the impact to our trees as well as um
[48:56]
things that are in the public right of
way. We have um you know neighbors in
[49:01]
this community particularly in North
Rhobit where they've probably done quite
[49:04]
a bit of landscaping that is in the
public right of way. So my point is I
[49:08]
would like to minimize the impact.
>> Absolutely. Yes.
[49:12]
» Um the next question that I have is
about the and this is maybe more for the
[49:18]
city manager and for the city on the
communication that we are I saw the door
[49:23]
door hangers part part of your
presentation but I I feel like we need
[49:28]
to do something ourselves um either in
lines of the sand or something to give
[49:33]
neighbors a heads up. I I'm just trying
to be proactive here because it's going
[49:37]
to come back to us, right? We're going
to have to be triaging a lot of
[49:40]
commentary and feedback. And if we're
proactive in making sure that our
[49:45]
residents know that this is coming and
not just waiting for a door hanger, you
[49:49]
know, that they may or may not see
because we have a lot of part-time
[49:53]
residents. Um, I really encourage us to
be smart with our communications
[49:57]
department and forwardleaning so that
people know. Yeah, I'm sure our
[50:02]
communications division can definitely
um work with IQ Fibers communications
[50:07]
team and get information out as you know
they're working on certain streets. For
[50:11]
sure.
>> Thank you.
[50:12]
» Um can I so just um because this has
come up before um and I should have
[50:17]
probably mentioned that we do have a
community relations team whose job is
[50:22]
specifically that um and so we we would
love to be proactive. Here's some things
[50:26]
we've done in the past. We've done
kickoff events. We've hosted town halls.
[50:31]
» Um we enjoy those. We we'll fund them.
We'll we'll make them an event that
[50:36]
hopefully people want to come to.
>> Um all in the um with the goal of making
[50:41]
sure that these inquiries come to us um
because ultimately that's where they're
[50:46]
going to need to be addressed. So we do
want to have as many relationships at
[50:50]
that people level. And so yes um we will
work with with this team to make sure
[50:55]
that we're doing that. We will work with
a communications cadence um that makes
[51:00]
sense. Dave and his team have weekly
meetings with various communities today
[51:04]
to talk about this thing either at the
department uh transportation level or
[51:09]
public works level or town manager
level. Whatever whatever you guys would
[51:13]
prefer, we would prefer as well that we
have very open, very robust
[51:18]
communication from here until whenever.
>> It's good to hear that. um you know,
[51:24]
knowing our residents, I'm sure they're
going to be reaching out directly to our
[51:29]
city government. So, having that cadence
of uh communication set up between our
[51:34]
two teams and the coordination, I think,
is critical. And I'm seeing heads
[51:38]
nodding. So, thank you for that,
>> Commissioner Saunders. And then,
[51:43]
Commissioner,
>> to be clear, there will be no new polls.
[51:46]
Is that correct? You'll use existing
polls in every case.
[51:49]
» Yeah. Yeah. We we're not um
we we would only utilize existing pole
[51:55]
line infrastructure if need be. We we
certainly prefer to be underground. Like
[51:58]
I said, it's much more protected.
>> Well, that's we're aiming to going
[52:00]
underground completely at some time in
the future. So,
[52:03]
» yeah, you would
>> if if that happens, especially the pole
[52:06]
owners, be it um I'm not sure if it's
>> Can explain to me please, and I I'm
[52:10]
ignorant on this. Can you tell me how
you get from your wire in the street to
[52:14]
my house? you go.
>> It would be depending on if it's
[52:18]
underground or or aerial, we would um
install an underground a direct buried
[52:23]
fiber optic drop cable from our
termination point, which should be in
[52:26]
front of your house or between you and
your neighbor directly to the
[52:29]
termination point on the side of your
house. They would place that either
[52:32]
utilizing um a vibratory plow, which is
kind of like a more of a heavier unit,
[52:37]
or um they would actually use a um a
spade shovel, as we kind of call it, to
[52:42]
to knife it in at about 10 inches deep.
And then do I need to buy any special
[52:46]
equipment for it to work inside my
house?
[52:48]
» You know, we supply everything.
>> Okay. Thank you.
[52:50]
» Yes, sir.
>> Commissioner, good.
[52:53]
» Uh, thank you for the presentation. I I
need to understand your business model a
[52:58]
little better. Just because I'm I'm
looking I'll just be honest. We we have
[53:03]
been Comcast customers here for many
many years and we're long-term customers
[53:10]
and um with the exception of the snow
storm of well several snowstorms and and
[53:15]
then one instance when a FedEx box truck
hit a Comcast I believe aerial cable
[53:21]
which knocked out internet for about
five hours. It's it's generally been
[53:25]
reliable, but I'm uh we [clears throat]
are paying well our our sort of rack
[53:30]
rate is $59.99 a month for extremely uh
you know fairly fast internet and we put
[53:36]
a lot of demands on the internet. You
know, we work from home. Um anyway, that
[53:41]
but we because we're we agreed to
autodebit some years ago, we actually
[53:46]
are paying $49.99 a month. And I'm just
wondering, you you show rates beginning
[53:51]
at $65 a month for a residential
customer. Um Oh, in addition, I know you
[53:56]
supply all equipment, but we purchased
equipment for about $30 full stop, I
[54:01]
think, five or more years ago. So, I
don't I'm I'm curious as to whether
[54:06]
those, you know, launch rates um are
working for you in other markets because
[54:12]
of what I see. you know, Comcast and
Verizon tends to match Comcast in areas
[54:16]
where you have both Comcast and Verizon
as you've probably noticed, but you have
[54:20]
a little duopoly going on there. And I
believe there's a third player, Cox
[54:25]
Communication. I have friends to the
west in Millsboro who also have the
[54:29]
option. So if you if you'd kindly
explain
[54:33]
how this pricing structure is going to
appeal to enough residents in this city
[54:40]
or do you have some possibility of
lowering your rates to more like $50 a
[54:45]
month for you know for the starting um
you know the the uh initial or the sort
[54:51]
of basic package.
>> Yeah. So, um, so I'll start with this.
[54:55]
The our our business, we have shown in
every single market we've ever been to,
[55:00]
we have the situation where there's
always an incumbent cable company. Um,
[55:06]
and there's always competitive pricing.
What we have found that um, within about
[55:11]
24 months, we'll end up with 40% of the
customers. Here's why. Um again we we
[55:18]
provide a different type of service um
symmetrical bandwidth and and what we
[55:24]
provide is it's it's priced differently
because it is different um fundamentally
[55:30]
to people realize that there when you
take out all the hidden fees the things
[55:35]
that um you don't have to pay for with
us for instance um your equipment
[55:40]
experience 5 years ago is is I think
commissioner good you would find is much
[55:44]
different if you go to Best Buy day and
look at, for instance, the Wi-Fi unit
[55:48]
that we'll put into your home, it's
north of $800. So, it's a it's a big
[55:53]
uplift in equipment because we're doing
much more horsepower. You know, 5 gigs
[55:57]
through the air. Um, and if we need a
repeater, for instance, if you have a
[56:01]
larger house with many walls, we're
going to walk around our our technician
[56:05]
before they leave and they're going to
make sure that that throughput is seen
[56:09]
throughout your residence. And if we
need to, we'll put a repeater again at
[56:12]
our expense. So we do those sorts of
things that earn us customers. We're not
[56:16]
we're not looking to be the lowest cost.
I think the ultimate for your community
[56:20]
and all communities really is choice
because at the end of the day um that's
[56:25]
going to you know if if at the end of
the day in order to get the numbers that
[56:28]
we need I we I guess we will lower our
prices. We haven't had to yet um but
[56:34]
maybe we will but that will be because
of competition. That's because there'll
[56:37]
be uh you know us giving it our best
effort, Comcast. And so yeah, [snorts]
[56:42]
that's I mean that's our business plan.
It's it's been working. Um it's you know
[56:46]
our funders like it. Our success has
been decent um to to really good and um
[56:52]
we we we fully expect to do very well in
Rahobit as a potential alternative. So
[56:58]
just to follow up, so your market
penetration in places like South
[57:01]
Carolina, what percentage of the market
um have you captured within like five
[57:06]
years?
>> We well within 24 months were expected
[57:11]
to capture between 35 and 40% and we've
been tracking to that. Some of our
[57:15]
initial cabinets that have been in
longer are approaching 60% penetration
[57:19]
and more.
>> And you haven't been in any markets for
[57:21]
24 continuous months.
>> Oh yeah, we have. All of those um
[57:24]
markets are in Florida. Those were our
initial markets. We haven't been in
[57:28]
South Car South Carolina is um less than
two years old, right?
[57:31]
» Oh, let's worry about let's focus on
Florida then. Like what's your market
[57:35]
share in Florida after say okay 24
months?
[57:39]
» We we we just I was just on a board
meeting two days ago and um the average
[57:44]
penetration is around 50%. So,
>> thank you Suzanne.
[57:48]
» Yeah, Commissioner Stewart,
>> uh I have one quick question because
[57:52]
because our street was all marked up for
this. The lines that go on my lawn, the
[57:57]
big red line that's been painted on my
lawn is not in the right of way. Is that
[58:02]
just telling somebody something? It's
You're not intending. You told me you're
[58:07]
not going to dig on my lawn.
>> Yeah.
[58:09]
» But [clears throat] I I think this would
help because people haven't had the
[58:11]
experience. We We've got green lines. We
got yellow lines. We got red lines. I've
[58:16]
got a manhole cover in my rightway that
you've now painted bright blue. Thank
[58:20]
you. Um so to that probably saves some
time if you tell us how this what these
[58:26]
all mean to us.
>> Yeah. So so if you're seeing color lines
[58:30]
out there after the M those are the
existing infrastructure lines. So red
[58:33]
being power. Okay.
>> Um and a lot of those uh infrastructures
[58:36]
were put in place like like uh you know
your power and your Verizon typically
[58:41]
usually those are the two big things
that were installed probably when your
[58:43]
development was was done many many years
ago. So, they required put in in a
[58:47]
public utility rightaway, which is kind
which a lot of times falls outside of
[58:51]
the the municipal rightway. So, they
might be a little bit further in the
[58:54]
yard at that point. Um, we'll be
installing within the the permissible
[58:57]
right away at that point. Um, but if
you're seeing
[59:00]
» the what I think of as the rightway, not
the utility rightway that's in my yard.
[59:04]
Is that what you're saying? Okay.
>> Yeah.
[59:06]
» Um, like I said, if if you're seeing
color lines, that's existing
[59:09]
infrastructure. Okay. Um when we do our
preconstruction uh preparations, you
[59:14]
might see us all we call it white
lining. So white paint is proposed, but
[59:19]
if it's colored, that's that's existing.
So you know, your blue is your water,
[59:22]
» yellow is going to be your your gas. Uh
the two big ones that we try to really
[59:27]
protect obviously is the power and the
gas.
[59:28]
» That' be good because those are the
dangerous ones, but you know, everything
[59:31]
we we will protect and and test pit and
make sure that they don't get damaged
[59:35]
during our installation process.
>> Okay. Thank you,
[59:38]
» Commissioner Gossip. Yes,
[clears throat] thank you. Uh, are you
[59:41]
currently operating in any other
Delaware municipalities?
[59:45]
» Yes. Uh, so we are in U Millsboro,
right? We've we've begun in Mills.
[59:52]
» Well, we're we're beginning construction
in Milsboro.
[59:55]
» Any any active where you have customers
online?
[59:58]
» Yes. So, we started in um South Do um
those are I mean they're not towns like
[1:00:04]
Rahobitis, but they're communities like
Magnolia and Highland Acres. And so yes,
[1:00:09]
we and we've been we've had lit
customers there since what April.
[1:00:14]
» Yes, since April. I think we're up to
400 customers. [clears throat]
[1:00:17]
» Less less than a year.
>> Yeah. Months. Months. And we're up to
[1:00:20]
400.
>> And you mentioned also that installation
[1:00:23]
will be done by subcontractors.
>> Yes. That we directly supervise.
[1:00:27]
» Okay. Um and [clears throat]
building, you know, prices look
[1:00:31]
interesting, whatever. But with like
Comcast, which I'm used to, there's
[1:00:34]
additional for telephone and TV and
streaming and that. Are these all add-on
[1:00:38]
aspects to these baseline prices?
>> We do we we only provide internet. So if
[1:00:42]
you're going to have
>> No, there's no TV. No
[1:00:44]
» no no. If you're gonna um if if you
choose to go with us and you have an
[1:00:48]
existing over-the-top streaming process,
our technicians will go through before
[1:00:53]
they leave. They'll make sure that
that's all working on the new system.
[1:00:55]
But no, we do not have we don't have any
television projects. We don't have any
[1:00:59]
like typical cable products. Uh we don't
do telephone. um we all we do is what we
[1:01:05]
do. And why we do that is because
um [snorts]
[1:01:09]
we don't want to partner with a company
that maybe doesn't have the um the
[1:01:14]
commitment to the customer service that
we do and and if we did that and and in
[1:01:18]
there it was suboptimal then it's going
to affect all of us. So we stick to what
[1:01:22]
we do and what we know what we build and
what we operate.
[1:01:26]
And I guess [clears throat] question is
this for solicitor city manager is this
[1:01:29]
an exclusive agreement that we're
signing?
[1:01:33]
» No. If you look at the contract it says
that um we have the right to contract
[1:01:38]
with anyone else as well.
>> I but also [clears throat] I just
[1:01:42]
question how we came to the terms um uh
under 2.2. That's a 15-year contract and
[1:01:48]
then an automatic renewal of 15 years.
And is that typical for what you're
[1:01:53]
negotiating with the rest of the
Delaware or do we know or how did we
[1:01:56]
arrive at those 15 and 15?
>> It's my understanding that it is we are
[1:02:00]
atypical. Um they had requested 30 years
and we felt that that was far too long.
[1:02:05]
So we only great agreed to 15 years.
>> And commissioner just one thing on the
[1:02:12]
phone and TV aspect. So I know a lot of
people like landlines and TV. So, there
[1:02:21]
are products out there that residents
could get if they did decide to do this,
[1:02:24]
like a a VIP phone. Um, and then there
are cable. Um,
[1:02:30]
» so they would be adding add-on costs.
>> They would just have to do that
[1:02:34]
themselves. Yeah.
>> As we are all technically acknowledged
[1:02:37]
of how to do that.
Um with that [laughter]
[1:02:42]
» and I'm just curious also in our code um
we have a fee for utility poles and
[1:02:47]
cables of $5 and I know we're
[clears throat] um going to update fees
[1:02:53]
and uh codes in the in the future but
just curious is that defined as $5 one
[1:02:59]
time over or $5 for every cable or do we
know any details on that? Now, we
[1:03:03]
haven't done this in many, many years,
but if it's five bucks total, I think we
[1:03:09]
need to reinvestigate that.
That's the fee charged to the supplier.
[1:03:15]
So,
>> fair enough.
[1:03:21]
» All right. Uh
if we go back to the agenda item report,
[1:03:26]
uh the action that they're trying to uh
get out of us today is uh the proposed
[1:03:33]
motion is to approve agreement for the
installation of a fiber optic broadband
[1:03:39]
network between the city of Rahovit
Beach and IQ Fiber. Uh let's take a
[1:03:43]
quick break and go to the members of the
public. Does anybody have any comments
[1:03:48]
they'd like to say? Nancy and then Deb.
[1:03:53]
And we'll come back to this table before
we vote.
[1:03:57]
» Thank you, Chief. Um, two things just
both on aesthetics. That bigger box that
[1:04:02]
serves seven or 800 people, I wonder if
it has a geological
[1:04:08]
radius because we're we're diffused.
We're spread out. We're not a dense
[1:04:12]
population. So, if you see seven or 800,
you think, well, most we'd have two of
[1:04:16]
those in town. But, can we check on
that? is it um I if if if they have to
[1:04:22]
be within a certain radius, we might
need more of those boxes and we wouldn't
[1:04:27]
want a bunch of them there because we
really care about aesthetics. So that
[1:04:30]
would be my first point and my second
point is I do understand that the
[1:04:34]
handhole would be flush to the ground.
For those of us who have little strips
[1:04:40]
of land between the sidewalk and the
street that we're required to mow but
[1:04:45]
still may be with the city, could the
handhold go there or where would the
[1:04:49]
handhold go? Does anyone know?
>> Thank you, Nancy.
[1:04:55]
» Yeah, once again, I mean, I'd have to
check the specific engineering for uh
[1:04:59]
the location you're describing. Like
said, we have to install within the
[1:05:01]
permissible rightway. If that's our
location within there, then yeah, it
[1:05:05]
would go within I always call that the
beauty strip, which is definitely
[1:05:08]
between the curb and the sidewalk. If uh
if that's not a sufficient spacing and
[1:05:12]
there's right away on the back side of
the sidewalk, that's where we would
[1:05:15]
install the uh the flush grade handhole.
And as far as for the um your your first
[1:05:20]
uh inquiry about the uh the large uh
cabinet that was in the picture, that
[1:05:25]
that services 5,000 customers. So
there's only one with in all of Hobbit
[1:05:30]
that would be that the the smaller ones
that would that would service
[1:05:34]
approximately 700 plus houses. They're
like I said about 2 by3 and they located
[1:05:39]
usually put them like maybe like um a
corner and infrastructure somewhere
[1:05:42]
that's as inconspicuous as possible. Um
but you would see them like I said
[1:05:46]
geolog like you said um within a radius
of that those those customers there
[1:05:51]
disperses accurately.
>> Thank you Deb.
[1:05:56]
Identify yourself. Thank you.
[laughter]
[1:06:00]
» My name is Deb Ward. I'm resident at 339
Hickman Street. I am also a former
[1:06:06]
Verizon FiOS employee. Um, so couple
questions because I'm familiar with
[1:06:12]
that. Um,
one thing that we always talked about at
[1:06:16]
least at Verizon is the benefit that we
were providing with the FiOS um, fiber
[1:06:22]
cable is that it's fiber to the home
versus sharing bandwidth. And I can
[1:06:27]
speak glad you get great con Comcast
service because I can tell you I've had
[1:06:32]
that's why I'm gray pretty much. Um, I
notice I notice a change in service as
[1:06:40]
our city um, uh, population
expands during the summer. Um, because
[1:06:47]
now you got more people that are using
that service and now you're you don't
[1:06:50]
have as much bandwidth. So, just to
confirm, we would have fiber to the home
[1:06:56]
and it's not shared bandwidth. Correct.
>> Yeah, confirming that. Um, yeah, thank
[1:07:00]
you for that. So yeah, what your
experience is in an overloaded cable
[1:07:03]
node. As you know from your experience
at FiOS, yes, it is fiber to the home.
[1:07:07]
We we build right now our minimum
backbone speed is 100 gigabits and
[1:07:12]
that's drilled two different directions
to Equinex and then a data center in
[1:07:17]
Baltimore and then it's TIG gig capacity
to the home but 100 gig, you know, right
[1:07:23]
on on the laterals. So yeah, we we build
and then we monitor that very quickly in
[1:07:28]
the industry usually like you know they
they act as you know like if it gets
[1:07:32]
over 60% utilization we're way below
that. So we will just add capacity to
[1:07:38]
make sure that we always want to be able
to brag about the capacity that we're
[1:07:42]
able to give our customers. And then if
I may follow up. So again back in those
[1:07:49]
days when Verizon was looking to expand
FiOS this was not seen as a desirable
[1:07:56]
area because of the influx of
population. So I just want to confirm
[1:08:01]
but because of what the governor is
initiating that's what's really kind of
[1:08:06]
bringing you to us to say as all of
Delaware we want to we want to make this
[1:08:11]
available
and Rahobit is just one area that we
[1:08:15]
also think is going to benefit.
>> Yeah. in part. Um, yes, the governor, so
[1:08:19]
Delaware, I will say, um, in all
honesty, has been extremely good to work
[1:08:24]
with and was a a factor in okaying this,
um, immense amount of money that we're
[1:08:33]
spending. Yes. Um, been in the industry
long enough to know, I remember those
[1:08:37]
days. Yes. When you were looking for
contracts and you were doing different
[1:08:40]
things. Um it's even, you know, um our
ROI is is uh dependent on our customer
[1:08:46]
service. We don't even have contracts.
So, yeah, we're making a big commitment
[1:08:50]
to
>> to to Delaware. Um we understand that
[1:08:53]
some of the the um
>> you know, the cost of doing business
[1:08:57]
here are there are a lot of HOA
communities, there are a lot of um
[1:09:01]
smaller communities, there are a lot of
these conversations that need to be
[1:09:05]
have. So we had to in terms of not only
just the money but the resources to
[1:09:09]
commit to the entire project because
that's really what it's going to take.
[1:09:13]
» Yeah. Don't underestimate the impact of
the cost of what building this
[1:09:19]
infrastructure is. Um two maybe two more
questions. So for the equipment um I
[1:09:25]
know there's we had a box on the outside
of the house kind of similar a little
[1:09:30]
bit bigger than what you may have now
with a Comcast box. Is there something
[1:09:34]
on the outside of the house as well as
on the inside?
[1:09:37]
» Yeah, we we'll typ typically place a net
on the exterior of the home. Um I think
[1:09:40]
Verizon Fires a lot of times used an
active box on the exterior that they
[1:09:44]
transition to Ethernet into the home.
>> We don't we just use a very small
[1:09:49]
passive demark uh nid on the outside. So
it transitions from our exterior drop
[1:09:53]
cable to the in interior uh drop line
that goes into your home to your uh to
[1:09:58]
your router and switch
>> and then
[1:10:01]
» but it's it's very small. It's like a
probably like that big. Like it's
[1:10:04]
extremely small and inconspicuous.
>> And then again with the technology, you
[1:10:08]
know, the router as as time goes on, the
technology in improves. You're you're
[1:10:14]
offering this equipment as part of the
contract price. Correct.
[1:10:18]
» Does that also include down the road
upgrades to equipment if necessary?
[1:10:24]
» Yeah, it is. And there there's no
contract that just um we we own and
[1:10:27]
maintain that. We do the firmware
upgrades remotely and then we're always
[1:10:31]
looking for opportunities to upgrade the
speed. As I said, we want to match as
[1:10:35]
soon as possible
>> um from 5 to 10 and and and get into
[1:10:38]
that. So, yeah, we will we we we will
monitor that and upgrade that would we
[1:10:43]
would just send it. That's a
plug-and-play that the customer can do
[1:10:46]
» and and does does that equipment box
that's in the home have a battery
[1:10:50]
backup?
>> It doesn't. It doesn't. But um it can
[1:10:53]
live on your really your less expensive
battery backup um because it's it
[1:10:59]
doesn't draw that much electricity. So
even a smaller battery backup would run
[1:11:02]
at probably 24 hours,
>> right?
[1:11:05]
» Yeah. Okay.
>> Thank you, Dev.
[1:11:08]
» Will we get an idea of timing of when
this is happening?
[1:11:12]
» Of course. Yes.
>> Yes. But we can't do anything until the
[1:11:16]
contract is approved, which is why we're
waiting to see.
[1:11:21]
» Anybody else?
>> We'll bring it back up here. Uh Taylor,
[1:11:26]
do you want to or Lisa, do you want to
uh
[1:11:34]
» say anything further?
>> No.
[1:11:36]
» No.
>> Okay. So, uh again, the uh the motion
[1:11:40]
the the agreement is a support document.
Uh, Commissioner Stewart, you had uh
[1:11:45]
» I was going to move
>> else you wanted to say
[1:11:47]
» I had another question,
>> Mr. Mayor.
[1:11:53]
» Uh, Commissioner Good.
>> So, I'm worried about jumping into this
[1:11:58]
until we have a better better idea of
comparable um options. My my issue is
[1:12:06]
that, you know, I'm I'm I'm looking at
your pricing and it seems to be the
[1:12:12]
older business model of Comcast and
Verizon where people would rent
[1:12:16]
equipment through Comcast and Verizon
each month and everyone wanted to get
[1:12:21]
away from that because the the net cost
the monthly cost kept rising because the
[1:12:26]
rental and then you know the federal
taxes. So whereas you know you are
[1:12:30]
giving this all-inclusive price that
includes the equipment and includes you
[1:12:34]
know eventually you're saying you'll
state-of-the-art equipment upgrades. I'm
[1:12:38]
nervous about that pricing model because
it's it's a little bit outdated now in
[1:12:44]
in terms of what the you know the big
players in this market Verizon and
[1:12:47]
Comcast are um are have been using for
probably almost a decade now. So I I
[1:12:54]
just I I'm not you know I I think
rushing into this today [snorts] would
[1:12:59]
be premature but you know others
obviously have you know different
[1:13:03]
opinions.
>> Thank you Suzanne. Susan
[1:13:05]
» mayor I'd like to make a motion to
approve the agreement for the
[1:13:09]
installation of a fiber optic broadband
network between the city of Rahobath and
[1:13:14]
IQ Fiber
um LLC.
[1:13:18]
» Second it. Uh we have a motion and a
second to approve the agreement uh here
[1:13:22]
in for the installation of a fiber optic
broadband network between city ro beach
[1:13:27]
and IQ Fiber LLC. Um uh all those in
favor signify by saying I
[1:13:35]
» I
>> I those opposed.
[1:13:37]
» Mayor I abstain. I don't feel as if we
have enough information to make an
[1:13:40]
informed decision on this. Thank you.
>> Okay.
[1:13:44]
» I'll I'll abstain as well. But we uh and
the record will show that uh all the
[1:13:49]
commissioners voted yes uh but for
Commissioner Gossit and Commissioner
[1:13:54]
[snorts] Good who abstained.
>> Very good. Gentlemen, thank you for
[1:13:59]
coming here today.
>> Uh no, I'm going to do the proclamation
[1:14:04]
now.
[1:14:09]
» Well, let's
[1:14:14]
do this.
[1:14:33]
» [clears throat]
[1:14:36]
» You're not going to come. You're good.
>> Up here. Okay. Uh my uh
[1:14:43]
my group was supposed to come here to
represent the uh ovarian cancer
[1:14:48]
survivors and I don't know where they
are. They're stuck on Highway Route One.
[1:14:53]
So uh I've asked the uh mayor elect
Susan Stewart to to join me today. This
[1:15:00]
is a proclamation for ovarian cancer
awareness month September 20 26. Whereas
[1:15:07]
ovarian cancer is the deadliest of all
female reproductive system cancers.
[1:15:12]
And whereas the American Cancer Society
estimates that in 2026
[1:15:18]
over 21,10
women will be newly diagnosed with
[1:15:22]
ovarian cancer. And whereas in 2025 it
is estimated that approximately 12,450
[1:15:30]
women will die in the United States from
ovarian cancer.
[1:15:35]
Many women are not diagnosed until the
disease has begun to spread. But if the
[1:15:40]
disease is detected at its earliest
state, stage one, the 5year survival
[1:15:46]
rate is more than 92%.
Symptoms of ovarian cancer are often
[1:15:51]
subtle and easily confused with other
ailments. And whereas one in 91 women
[1:15:58]
will be diagnosed with ovarian cancer
during their lifetime.
[1:16:03]
Whereas during ovarian cancer awareness
month, we honor the loved ones we have
[1:16:08]
lost to this disease and all those who
battle it today. And we continue our
[1:16:14]
work to improve care and raise awareness
about ovarian cancer. And whereas that
[1:16:20]
is why it is important for all women to
pay attention to their bodies and know
[1:16:24]
what is normal for them. Women who
experience unexplained changes including
[1:16:29]
abdominal pain, pressure and swelling
should talk with their health care
[1:16:34]
providers. And whereas ovarian cancer
and the hardship it brings have affected
[1:16:39]
too many lives. This September we stand
with everyone who has been touched by
[1:16:44]
this disease and we recognize all those
committed to advancing the fight against
[1:16:49]
the cancer through research, advocacy
and quality care. And now therefore we
[1:16:55]
mayor Mills board vice president Patrick
>> Gosset and President-elect
[1:17:02]
» mayor
[1:17:05]
[laughter]
>> mayor
[1:17:07]
Stewart
hereby proclaim September 2026 as
[1:17:13]
ovarian cancer awareness month. Together
let us renew our commitment to reducing
[1:17:18]
the impact of ovarian cancer and to a
future free from cancer in all form
[1:17:24]
proclaimed as 21st day of August 2026.
Stan Mills and Patrick Gosset. So, thank
[1:17:30]
you.
>> Thank you, Mayor.
[1:17:32]
[applause]
[1:17:38]
» Thank you. Thank you for joining me up
here.
[1:18:04]
Who knows the presiding officer?
>> I think you're in charge for the
[1:18:09]
» president can do it. [laughter]
[1:18:14]
» All right, Mr. Tedar, if you'd like to
begin your report.
[1:18:19]
Thank you.
This item is the uh review and discuss
[1:18:24]
the request for information submissions
received for our potential master
[1:18:27]
planning initiative. As you know,
earlier this year, the city released a
[1:18:32]
request for information
um looking for master planning services.
[1:18:37]
And so the RFI really is a information
gathering session. So, for those of you
[1:18:42]
that have looked at the packet, um I
included the actual RFI itself that the
[1:18:47]
city um authored and sent out to over
two dozen uh planning firms. And then we
[1:18:55]
received four responses uh one from
Dover Colon Partners, one from Rossi
[1:19:01]
Group, Tool Design, and Wallace
Montgomery. Um, and then I also included
[1:19:07]
the uh zoning code update presentation
that Dover Cole did for the city um not
[1:19:13]
too long ago. So ultimately really what
we're looking for is to try to come up
[1:19:20]
with a scope of work and after the
sharet week and the work that Do Cole
[1:19:25]
has done so far, um staff's
recommendation is to move forward with
[1:19:30]
Dover Cole. What I'd like to do is have
the board of commissioners um authorize
[1:19:34]
me to go back to do coal and try to come
up with a scope of work um for us uh
[1:19:40]
with a specific price because the the
pricing really can vary depending on
[1:19:45]
what components are in the actual master
planning efforts. Um the city's never
[1:19:51]
had an economic development um analysis
performed on our commercial corridor.
[1:19:57]
Um, but we've had a lot of other studies
done such as parking and transportation
[1:20:02]
and those are already being they've
already been reviewed and used by Dover
[1:20:07]
Cole. So those are things that we
wouldn't need um to do again. Um, so
[1:20:12]
ultimately, um, in speaking with Joe
Cole, it does sound like we could land
[1:20:17]
in the 2 to 300 range, under 300,000,
um, which we did budget for planning
[1:20:25]
services, um, in the budget. But, um,
ultimately, if you do authorize me to go
[1:20:31]
back to do Cole and ask for a formalized
scope of work to really show all of the
[1:20:36]
pieces of what this would entail, I
would bring that back to you for your
[1:20:39]
approval.
Mr. Tedar, am I correct that
[1:20:43]
Commissioner Saunders,
>> I'm sorry. Am I correct that that would
[1:20:47]
dovetail with what do Cole is currently
doing for us?
[1:20:51]
» Yes. So, it would build upon that for a
greater vision of what our what our
[1:20:56]
downtown.
>> You would not be paying twice for the
[1:20:59]
same product.
>> Correct.
[1:21:00]
» Very good.
>> Because right now they're only focused
[1:21:03]
on our commercial zoning code.
>> Thank you,
[1:21:06]
» Mr. Mayor.
>> Commissioner Good.
[1:21:10]
So, um, those of you, uh, I think all of
us here did see the July 17th
[1:21:15]
presentation which culminated over
Kohl's, uh, spending, I think, four
[1:21:20]
working days in the city with the
Cherrettes. And that 150,000 in the end,
[1:21:26]
well, it brought four consultants up
from Florida, you know, that we had to
[1:21:29]
fund. Um, had exactly two
recommendations. One of which seemed um
[1:21:36]
which was one was to obviate the two
parking space requirement for mix for
[1:21:41]
new mixeduse um properties which seemed
odd because those properties typically
[1:21:46]
do do need off- streetet parking.
And the other one was to tweak the 42
[1:21:53]
foot height maximum if if they if the
um renovation or the new construction
[1:22:01]
had a more aesthetically aesthetically
superior way to maybe sort of have part
[1:22:07]
of the roof be a little above 42 feet,
but most of it comply with the 42 feet,
[1:22:13]
which seemed like a maybe a reasonable
thing to consider. I I felt city staff
[1:22:18]
and and citizens would be able to make
that decision without a a consultant.
[1:22:23]
What concerns me is that a lot of this
master planning, it's it's government
[1:22:28]
spending. government spending, which
means the taxpayers and the rateayers
[1:22:32]
here are funding this, which normally
the board of commissioners were tasked
[1:22:37]
with police, fire, and infrastructure.
And the all these consultancies end up
[1:22:43]
being a lot of sessions with getting
feedback from mostly amateurs in my
[1:22:49]
view. And it seems redundant with the
CDP, which were mandated to do every 10
[1:22:55]
years. So, I'm very concerned that
someone for some reason is enamored of
[1:23:02]
Dover Cole in spite of very minimal,
underwhelming
[1:23:07]
uh output from their $150,000
consultancy, which we saw, if you watch
[1:23:14]
the July 17th 2M meeting, see for
yourself if that is how we should be
[1:23:21]
spending the public's money. I think
not. So I will obviously be voting
[1:23:26]
against uh the STRA staff
recommendation. No surprise of the four
[1:23:30]
contractors is continue with do coal.
Yeah, maybe it segways better than the
[1:23:35]
other three being, you know, newbies on
the block for us. But um I'm very
[1:23:40]
concerned about this. I don't know why
we need more guidance than, you know,
[1:23:46]
than other 1.2 two uh square mile towns
in Delaware which you know rely on the
[1:23:53]
CDP for for most of this work.
>> Thank you Suzanne. Uh
[1:23:58]
did Commissioner Stewart?
>> Thank you mayor. Um I think we have a
[1:24:04]
very distinct and and narrow question
here and that is do we authorize the
[1:24:09]
city manager to go back and get no do
called to narrow their scope. Number
[1:24:14]
one, we have not seen the output yet
from the zoning code rewrite. Number
[1:24:20]
two. Number three, we
derived 63% of our revenue from tourism
[1:24:26]
related activity, 10.9 from property
taxes and yet 100% of our quality of
[1:24:34]
life issues are this disharmony between
the commercial existence and our
[1:24:40]
existence. We have to plan for the
future if we want to preserve what we
[1:24:45]
like about the past. And then lastly, um
I've learned this past summer in the
[1:24:51]
last month that the words reimagine
Rahobitth are triggering for some
[1:24:55]
people. So, can we never say it again
and call this something else?
[1:25:00]
» That's why I called it master planning
services.
[1:25:03]
» Okay, cool. Thanks. It's and it's off
the website. That little
[1:25:07]
» We'll be changing.
>> Okay. Thank you, Mayor.
[1:25:11]
Commissioner Saunders,
>> I just want to respond to uh
[1:25:13]
Commissioner Good. If you had been there
to the Cherrettes, I think you would
[1:25:18]
have found that we that that we got a
lot more than just two suggestions for
[1:25:22]
the $157,000.
First of all, the $157,000
[1:25:27]
is for the next two years that they will
be working on our updates with us.
[1:25:32]
» Mark, address Address us.
>> Oh, I'm sorry. So, at any rate, I don't
[1:25:36]
want the public to be misled into
Commissioner Good's comments because
[1:25:40]
they were false.
>> Mr. Mayor, no,
[1:25:43]
» I'm aware that not all the work has been
affected by Dover Cole under the 100%.
[1:25:49]
» You do not have I would like the floor,
please.
[1:25:52]
» Do not have the floor. Chris, did you
have something?
[1:25:55]
» Uh, sure. So, a a couple of things.
Thanks, Mr. Mayor. Um, first of all, I
[1:26:00]
uh thank you for putting this um report
together. Um, I really enjoyed the
[1:26:06]
sharetses and um I thought the RFI
responses were really helpful to to
[1:26:13]
have. Um, to me the um breadth of
experience um that is outlined in the
[1:26:22]
Dover Cole response is is notable. um it
far surpasses the um input from the
[1:26:31]
others. There there were interesting
ideas in in the other responses and I'm
[1:26:34]
grateful that those companies took the
time to to put those um responses
[1:26:40]
together. Um you know, a point that I
made when we had our meeting in July
[1:26:44]
after the Cherrettes was that I think
doing nothing is a dereliction of duty
[1:26:48]
and I stand by that comment. Um, I think
we have to be intentional in planning
[1:26:53]
for the future and I think that that's
what this work does. So, I am um excited
[1:26:59]
about it and I'm supportive.
>> Mr. Mayor, can clarify just
[1:27:05]
» Taylor, can you uh uh uh reiterate what
you're hoping to get out of this
[1:27:10]
conversation?
>> Mr. Mayor, can I just clarify? I No, you
[1:27:13]
can't. I think
I wasn't there. I was in Montana until
[1:27:19]
Thursday night the 16th on a vacation
that had been qualifies as not there.
[1:27:23]
» Yeah, but I mean you act as though
somehow I deliberately wasn't there. I
[1:27:27]
had a planned vacation in April and the
cheret dates were announced in May. So I
[1:27:32]
had no ability to be present. I was here
for the 2:00 meeting on July 17th though
[1:27:37]
which had was on the calendar. There's a
proposed motion question right on the
[1:27:41]
last page of the agenda item report um
>> directing the city manager to negotiate
[1:27:47]
a scope of work and fee proposal with
Dover Cole and partners for downtown
[1:27:51]
master planning services structured as
the next phase of the city's existing
[1:27:54]
engagement with the firm on the zoning
code update
[1:27:56]
» and and if we do that and there's a
favorable outcome what is our commitment
[1:28:01]
to them are we
>> there is no commitment until I bring
[1:28:05]
that proposal back to you for approval
So, I think we can get it done fairly
[1:28:10]
quickly. Um, perhaps as soon as the next
meeting. Um, but that's where you would
[1:28:16]
commit. Right now, you're not committing
to anything. Just directing me to go
[1:28:20]
back to them and get a scope of work.
>> Okay. So, what it is, what our motion
[1:28:25]
today would be
>> directing directing you, but but to do
[1:28:32]
Cole and and excluding the other three.
>> Yes, sir. And I don't know if you want
[1:28:37]
to do public comment.
>> That's next. Yes,
[1:28:40]
» Mr.
What is the rush to do the second
[1:28:44]
contract? Mr.
>> You do not have the floor. Contract has
[1:28:47]
» My name is Nancy Doyle and I live at 202
Country Club Drive. Um, I uh like the
[1:28:53]
comments of uh Mark Saunders and also
Commissioner Glante and uh
[1:29:00]
[clears throat] Commissioner Mark
Saunders and Commissioner Glanti and
[1:29:03]
having attended a lot of the week of
shits because it happened to be
[1:29:07]
convenient for my schedule. I know it
wasn't for others. There was such broad
[1:29:12]
community support. We really needed to
do this. The citizens the business
[1:29:16]
people came in skeptical. It's the
singular. It's popular thing. I can only
[1:29:21]
think of one person I've ever met who's
trying to throw water on this. So, it's,
[1:29:27]
you know, we really shouldn't because I
saw a lot of deep community consensus on
[1:29:32]
this and I was impressed with them and I
was willing not to be, but it's exactly
[1:29:37]
what Chris says. They know a lot. So, I
I'm strongly in favor of this and I like
[1:29:43]
the idea of saying um change not chance.
It's not that we're doing social
[1:29:48]
engineering or autocratically telling
people what to do. It's that we're
[1:29:52]
listening to our businesses and
residents who are all saying, "Yes, we
[1:29:57]
need this." And and and I I am certain
there is a huge amount of community
[1:30:03]
support behind this project and I I I
I've been in touch with people. I live
[1:30:07]
through that week. I know it's there.
So, it's just I stand on that certainty
[1:30:12]
and I convey it to you.
>> Thank you, Nancy. Susan Gay.
[1:30:20]
» Thanks, Susan Gay, Country Club Drive.
Um, my comments actually go back a
[1:30:24]
little bit in time. Um, when I was a
newly appointed planning commissioner
[1:30:28]
almost 10 years ago, um, I remember the
then chairman David Melon talking
[1:30:33]
frequently about the need for a master
plan. In fact, I realize now that there
[1:30:37]
are two others were with me in that
time. Joyce Lucer Barry were on the
[1:30:42]
planning commission then as well. And
when we started working on the 2020 CDP,
[1:30:47]
we had agenda items on mixed use and um
and some new projects were starting to
[1:30:53]
come in then. Some of the big new
development projects came to us then.
[1:30:56]
And of course, that process got a little
changed by the by the pandemic. This was
[1:31:00]
pre- pandemic. But nevertheless, I want
to just make quote a couple of things
[1:31:04]
that Chairman Melon said at the time
because uh they resonate very much
[1:31:09]
today. He said, 'We don't have mixeduse
housing in the commercial district
[1:31:14]
conceptually in the way most people
would think of mixeduse housing. If the
[1:31:18]
city were to decide that's where we want
to go, it will result in a different
[1:31:22]
looking downtown ultimately. Rather than
let that happen haphazardly on a one-off
[1:31:28]
basis, there should be a master plan.
Then when asked what's a master plan, he
[1:31:33]
said, this is again chairman Mill, not
me. You take a look at the whole
[1:31:37]
downtown area. You take a look at it
holistically. What do we want the town
[1:31:41]
to look like in the future? Then you
develop a master plan with a concept of
[1:31:46]
how people will use it and where you
want to go in the future. We have not
[1:31:49]
done that as a city unfortunately and it
penalizes each group that comes before
[1:31:54]
us.
So I could not be happier given given my
[1:31:59]
experience over the years with planning
commission. I could not be happier that
[1:32:02]
we're at that point today and I feel
very positive about it and I certainly
[1:32:06]
hope we move ahead with it. The other
thing I would say just as a comment
[1:32:09]
about because I read the do coal uh and
I expected it to be good because I had
[1:32:13]
been very impressed with the sheretses
um and every how all that transpired.
[1:32:18]
But one of the things that impressed me
the most about that was the way they
[1:32:22]
took out the architectural review guide
which had not been looked at in a very
[1:32:25]
long time and they used that as a to to
inform some of the recommendations they
[1:32:32]
were making and some of the questions
they asked. And I would hope there there
[1:32:35]
are other reports, there are parking
reports, there are transportation
[1:32:38]
reports, there's some good stuff there.
And I have this feeling that Do Cole
[1:32:42]
will be the one group that will be able
to take all of that information and use
[1:32:46]
it for good going forward. And it will
not have been a waste. So, thank you.
[1:32:49]
» Thank you, Susan. Anybody else? Michael,
[1:32:56]
» Mike Vanzy, Above the Dunes. Uh I would
just like to say as a business owner for
[1:33:00]
many many years here in this community
um that is one of the first times in the
[1:33:04]
shs and I'm obviously very busy in July
and August. Um still made time to be I
[1:33:09]
think at five sessions. Um the first
time I've noticed the business community
[1:33:14]
and the residential community coming
together and having discussions about
[1:33:18]
one topic. Uh, I think it was incredibly
beneficial and I think it's something we
[1:33:22]
need to continue to do because planning
based on just the business needs or
[1:33:27]
planning just on the residents needs
really misses the boat as to what we
[1:33:30]
have to do to grow and move forward. So,
it's my thought. [applause and cheering]
[1:33:36]
Uh, if there's nobody else, I'm going to
bring it back to the table here. Does
[1:33:41]
anybody have further discussion or want
to make a motion?
[1:33:46]
Mayor, if I make a motion to direct
[clears throat] the city manager to
[1:33:49]
negotiate a scope of work and fee
proposal with Dover Cole and Partners
[1:33:53]
for downtown master planning services
structured as the next phase of the
[1:33:57]
city's existing engagement with the firm
on the zoning code update.
[1:34:02]
» Second.
>> Uh we have a motion and a second to
[1:34:06]
direct city manager to negotiate a scope
of work and fee proposal with Dover Cole
[1:34:11]
Partners for downtown master planning
services. Uh, as noted, uh, all those in
[1:34:17]
favor signify by saying I. I.
>> I.
[1:34:20]
» Those opposed?
>> No. Especially because we're already in
[1:34:25]
the in the middle of their first
contract. This seems premature to me.
[1:34:29]
» We have your uh the record will show
that six commissioners voted yes and one
[1:34:34]
voted no.
>> Uh, thank you very much.
[1:34:38]
With that, give us a minute.
[1:34:43]
Is this going to set up here? Okay.
[cough and clears throat]
[1:34:53]
[snorts]
[1:35:11]
Thank you.
[1:35:38]
I don't know what I did, but you're
going to look at cheats or whatever.
[1:35:42]
whatever it is. [laughter]
[1:35:48]
Uh the next item on our agenda is
discuss and possible consideration of
[1:35:52]
action on confidential report regarding
commissioner conduct. Uh joining us for
[1:35:58]
this agenda topic is attorney Lisa
Hatfield of Connelly Gallagher LLP.
[1:36:03]
Welcome. Thank you for coming today. By
way of background, the city through our
[1:36:09]
director of human resources received
several complaints concerning the
[1:36:13]
conduct of a commissioner directed
towards city staff.
[1:36:17]
These complaints were exacerbated during
the month of June
[1:36:22]
and the city retained an independent
attorney, Miss Molly Debianca,
[1:36:27]
to investigate the matter.
Miss Debianca and her firm DBianca Law
[1:36:33]
conducted an independent investigation
and prepared a confidential report
[1:36:38]
containing her findings and
recommendations.
[1:36:41]
The personnel committee composed of
commissioners uh Gosset who is the chair
[1:36:48]
and commissioners the Galante received
and reviewed the report and thereafter
[1:36:54]
forwarded the matter for consideration
by the mayor and commissioners.
[1:36:59]
Before we proceed, I want to explain the
process the board will follow.
[1:37:04]
The independent investigative report
concerns the conduct of Commissioner
[1:37:08]
Suzanne Good. Because Commissioner Good
is the subject of the report, she did
[1:37:14]
not participate in the personnel
committee's consideration of this
[1:37:18]
matter.
Commissioner Good, like other
[1:37:22]
commissioners, however, was provided a
copy of the report before this meeting,
[1:37:28]
and the report was provided to her on
the same confidential basis applicable
[1:37:33]
to the other members of the board of
commissioners
[1:37:37]
and remains confidential pending action
by the board. Thus, if she or any
[1:37:43]
commissioner were to have shared the
report with anyone, they would be in
[1:37:47]
violation of breach of confidentiality.
[1:37:52]
I want to be clear about the nature of
today's proceeding. This is not a
[1:37:56]
hearing.
The board is not sitting as an
[1:38:00]
adjudicatory body taking testimony,
receiving evidence, determining the
[1:38:05]
admissibility of evidence, or conducting
a trial concerning the matters addressed
[1:38:12]
in the report.
[1:38:15]
As Commissioner Good is the subject of
the report, she will be afforded an
[1:38:19]
opportunity to make a statement. This
will recur after
[1:38:24]
the public comment period and following
commissioner discussion of the report
[1:38:28]
and its recommendations.
That opportunity is not a reopening of
[1:38:36]
the investigation
and is not an evidentiary rebuttal of
[1:38:42]
the investigator's findings. There will
be no presentation of witnesses,
[1:38:47]
cross-examination, questioning of the
investigator, or pointby-point
[1:38:52]
adjudication
of the report.
[1:38:56]
Now, the first order of business is that
the board must first determine whether
[1:38:59]
to wave any applicable privilege and
then to authorize public release of the
[1:39:05]
report.
Because the report remains confidential
[1:39:09]
until and unless the board acts, the
public cannot presently be provided the
[1:39:15]
report or its confidential comment
contents. Uh I would now entertain a
[1:39:21]
motion to wave the attorney client
privilege to the extent applicable with
[1:39:26]
respect to the independent investigative
report and authorize the report to be
[1:39:32]
released publicly without exhibits. Do I
have a motion?
[1:39:37]
» I I need to speak.
>> Do I have a motion?
[1:39:39]
» No. Foyer,
>> you do not have You do not have the
[1:39:43]
floor.
>> You can't make a motion to release a
[1:39:47]
report before I've had a chance to
defend myself.
[1:39:51]
» You do not have the floor was written by
an attorney who insulted me. I wasn't
[1:39:57]
given the report until yesterday.
>> All the all the We have a motion.
[1:40:03]
government going
>> Evan
[1:40:06]
» I wasn't even informed about the
existence of the court
[1:40:10]
days ago
>> I can't Are you silencing her phone her
[1:40:14]
microphone
>> it is muted [laughter]
[1:40:18]
» mayor just to be clear the motion is to
wave confidentiality that's that's all
[1:40:24]
we're talking about right now is that
correct
[1:40:26]
» well the specifics yes wave attorney
client privilege to the extent
[1:40:31]
applicable with respect to the
independent investigative report that
[1:40:35]
were referred to and authorize the
report to be released publicly without
[1:40:40]
exhibits. We have a motion and a second
in in that vein. Uh and uh we'll just do
[1:40:46]
a group vote. All those in favor signify
by saying I
[1:40:50]
» I
>> I those opposed
[1:40:53]
» nay. And we have one nay from
commissioner good and the rest remainder
[1:40:58]
of the commissioners have voted in favor
of releasing it. Uh so the board with a
[1:41:04]
favorable vote just now has waved
privilege to the extent applicable and
[1:41:09]
authorized public release of the report
without its exhibits by way of embedment
[1:41:15]
of the report into this meeting agenda
following adjournment of the meeting.
[1:41:20]
Again, after this meeting, the report
will be embedded into the agenda. Uh, I
[1:41:27]
will now recognize Commissioner Gossit,
chair of the personnel committee, to
[1:41:33]
provide an overview of the
investigation,
[1:41:36]
the report, its findings, and its
recommendations.
[1:41:41]
» Thank you, mayor. [clears throat] Um, if
I may, the report begins with a scope of
[1:41:45]
investigation. On or about June 29th,
2026, Debianca Law LLC was retained by
[1:41:51]
the city of Verhobit Beach to
investigate allegations of harassment
[1:41:56]
and abusive behavior by Commissioner
Suzanne Good targeting two city
[1:42:00]
employees. The evidence considered by
the investigator includes one,
[1:42:04]
approximately 90 emails sent by
Commissioner Good in June 2026 to
[1:42:10]
certain employees and elected officials.
[clears throat]
[1:42:14]
Two, certain emails sent by Commissioner
Good to employee number two during the
[1:42:19]
month of July 2026.
[clears throat] July emails targeted
[1:42:24]
with the June emails with reviewed
emails. three, interviews of the
[1:42:29]
targeted employees, and four,
correspondence relating to prior efforts
[1:42:34]
of the city to deter abusive behavior by
Commissioner Good. It is the
[1:42:39]
understanding of the investigator that
Commissioner Good sent nearly 2,000
[1:42:43]
emails to the targeted employees since
2024 and continues to send more on a
[1:42:49]
daily near daily basis. However, this
report is limited to to the reviewed
[1:42:54]
emails as a representative and current
sample of the communications.
[1:43:00]
The report in summary states the
questions presented to the investigator
[1:43:04]
include one, whether there are
reasonable grounds to conclude that
[1:43:08]
Commissioner Good engaged in harassment
and or abuse in violation of any city
[1:43:13]
policy, rule, or ordinance? and two, if
yes, what steps are available to remedy,
[1:43:20]
stop, and/or prevent future violations
from occurring.
[1:43:24]
The investigator determines that there
are reasonable grounds to conclude that
[1:43:29]
Commissioner Good engaged in conduct
that violates the city civil civil
[1:43:34]
civility code and recommends that the
city take immediate action to stop the
[1:43:39]
conduct and ensure it does not happen in
the future as outlined in the
[1:43:43]
recommendations.
>> [clears throat]
[1:43:45]
» Legal background outlined in the report.
There are several laws to the present
[1:43:50]
analysis. They [clears throat] are
described below. Anti-harassment and
[1:43:55]
anti-retaliation laws, the civility
code, and the ethics code.
[1:44:00]
The nature of the abusive behavior is
persistent despite repeated
[1:44:04]
interventions and continued escalations
and is calculated circumvention of
[1:44:09]
directives established conduct so far
outside the norms of acceptable
[1:44:15]
professional behavior and the
obligations set forth in the civility
[1:44:19]
code as to warrant serious and immediate
remedial action by the city to prevent
[1:44:25]
legal liability under state and federal
employment and workplace safety laws.
[1:44:29]
cause and to avoid the high cost and
associated negative impacts that prolong
[1:44:35]
abusive behavior that have an an on
employee morale, workplace productivity,
[1:44:41]
and the city's ability to operate
efficiently of the city.
[1:44:47]
The report makes the following
recommendations.
[1:44:50]
The [clears throat] city board of
commissioners is recommended to consider
[1:44:53]
the following remedial steps to address
the ongoing abuse of city employees by
[1:44:58]
Commissioner Good. One, prohibit
Commissioner Good from communicating
[1:45:03]
directly or indirectly with the city
employees electronically, in person, via
[1:45:08]
phone, or other channel or method. To
effectuate this, the city should create
[1:45:14]
and apply a system by which all emails
received from accounts associated with
[1:45:18]
Commissioner Good are automatically
redelected to a special purpose and
[1:45:23]
sequestered email account, which should
be checked at regular intervals by the
[1:45:28]
mayor or their design. Additionally,
city employees should be permitted to
[1:45:33]
block Commissioner Good's associated
phone numbers from their personal and
[1:45:37]
city phones to prevent them from
receiving further text messages and
[1:45:41]
phone calls from Commissioner Good. Two,
prohibit Commissioner Good from
[1:45:46]
accessing the city's administrative
offices and deactivate her key cards,
[1:45:51]
fobs, andor keys to ensure compliance.
Three, formerly request that
[1:45:57]
Commissioner Good produce to the city
all communications involving city
[1:46:02]
business sent and/or received via a
personal platform, including but not
[1:46:07]
limited to via Gmail, text messages, and
Facebook and other social media. four
[1:46:14]
formally requests that Commissioner Good
issue unqualified [laughter] written
[1:46:18]
apologies to employee number one and
employee number two within two weeks in
[1:46:23]
a form and which substantiates approved
by the board and that such apologies, if
[1:46:28]
any, be made public. Five, formally
request that Commissioner Good promptly
[1:46:34]
complete city approved training on the
subject of respectful workplace and
[1:46:39]
civility and FOYA and public records
laws and obligations.
[1:46:44]
Six, review compliance with a remedial
measures on a date certain between 60
[1:46:49]
and 90 days. Additionally, the board is
recommended to consider issuing a formal
[1:46:55]
censure for the conduct that has
occurred and/or if the conduct continues
[1:47:00]
following the adoption of some or all of
the above remedial measures.
[1:47:04]
Respectfully submitted, Margaret Dybanka
Esquire, Dybanka Law LLC.
[1:47:10]
Thank you.
>> Thank you, Commissioner. Uh next,
[1:47:14]
the members of the board who
participated in consideration of this
[1:47:18]
matter will make comments or have the
opportunity to make comments they wish
[1:47:23]
just concerning the report and the
actions to be taken. Commissioner Good,
[1:47:29]
you will be granted an opportunity to
speak following public comment on this
[1:47:33]
matter. Uh Commissioner Stewart, you
wanted to
[1:47:36]
» That's not the usual order.
>> Thank you, Mayor.
[1:47:39]
» Public comment comes back. You don't
have the floor.
[1:47:43]
» Today's report documents repeated
violations of federal and state
[1:47:47]
workplace safety laws as well as the
city charter. We take no satisfaction in
[1:47:52]
this. We want nothing more than to move
on, but we have no choice. Re releasing
[1:47:58]
this report and implementing its
recommendation, however inadequate to
[1:48:03]
the harm caused, is necessary. In most
workplaces, the documented conduct would
[1:48:09]
warrant ter termination. Our laws
provide no such path for an elected
[1:48:14]
official. To simply move on would mean
keeping this conduct secret, leaving the
[1:48:20]
victims to shoulder the burdens
themselves without institutional
[1:48:24]
support. That is unacceptable.
This report focuses on two victims,
[1:48:30]
employee one and employee number two,
and just two months of emails. But the
[1:48:35]
record is larger than that. There are
many more months of abusive emails and
[1:48:42]
social media posts that violates these
very same laws. And the commissioner
[1:48:47]
targeted other city employees as well.
That is why this report and its release
[1:48:53]
is necessary. These are real people with
real professional reputations and real
[1:49:00]
careers. And the city needed to use what
limited power it has to say, "We hear
[1:49:06]
you. We see you. We wish we could do
more." Does the city want to move on?
[1:49:13]
Absolutely. Does it have the power to?
It does not. The power lies squarely
[1:49:20]
with the commissioner. This behavior
must stop now.
[1:49:25]
» Thank you, Mayor.
>> Any other commissioners?
[1:49:29]
» Yes. Thank you,
>> Commissioner Gossip.
[1:49:31]
» Yes, Commissioner [clears throat] Good.
Your words and actions have brought us
[1:49:34]
to this moment. You have never denied
that you have said or done these things.
[1:49:39]
Words and actions have consequences. The
gridlock you have created with your
[1:49:44]
pattern of conduct designated to
intimidate, demean, and harass rather
[1:49:49]
than to advance legitimate city business
is unacceptable, inconsistent with the
[1:49:55]
standard expected of an elected
official, and disruptive to the
[1:49:58]
effective operation of city government.
The city as an employer has an
[1:50:03]
obligation to maintain a safe workplace
free from harassment and abuse. The
[1:50:09]
pattern of overt aggression targeting
employees represents a serious breach of
[1:50:14]
the most basic professional standards
expected in any work environment and has
[1:50:19]
rendered this workplace inhospitable and
potentially unsafe for all city staff.
[1:50:24]
It is my expectation that the city and
commissioner good will implement the
[1:50:29]
recommendations in the report and that
the result will be more effective and
[1:50:33]
civil operation of civ civic government.
Thank you. Anybody else? Any
[1:50:39]
commissioners?
Uh I'll reserve my statement uh to a
[1:50:44]
later time.
[1:50:47]
So as the board has now acted to wave
privilege,
[1:50:51]
the report has been authorized for
public release and the personnel
[1:50:56]
committee has explained its findings and
recommendations of the report and will
[1:51:01]
provide an uh we will now provide an
opportunity for public comment.
[1:51:06]
Now that the substance of the matter has
been publicly presented,
[1:51:10]
uh, is there anybody that would like to
comment on the substance
[1:51:15]
of the report? Nancy Doyle.
[1:51:22]
My name is Nancy Doyle and I live at 202
Country Club Drive and I am a resident
[1:51:29]
and I was well met as a federal
prosecutor because I'm from New England
[1:51:34]
and people from where I am in Vermont,
New England are pretty moralistic, often
[1:51:39]
annoyingly so and I I was built that
way. So I could speak with real
[1:51:45]
credibility to juries.
But one of my great honors as a
[1:51:50]
prosecutor was dealing with the victims
of crime
[1:51:54]
as a part I hadn't really experienced in
my childhood in New England was bonding
[1:51:59]
with them sort of really being their
helper and their theorist therapist when
[1:52:04]
I look back in those years be standing
tough with those victims of crime and
[1:52:09]
standing with them and saying this isn't
right and this has to stop to bullies
[1:52:13]
bullies of all sorts serial rapists
double homicides
[1:52:18]
and simple misdemeanors that could cause
life-changing emotional harm to victims.
[1:52:23]
To be there with them was in the moment,
not afterwards, not after a lawsuit, but
[1:52:28]
in the moment was so important to them.
And it made me so useful. It was as
[1:52:34]
important as anything I did in my in the
courtroom. And though I went on to do
[1:52:39]
international financial policy and
derivatives and other things, if you ask
[1:52:44]
me the most useful I ever was in my
career, it was how I took care of those
[1:52:48]
victims in the moment. Bullying has no
place in the workforce is not a little
[1:52:55]
civil thing. I have been present in this
room and I have seen the bullying. It
[1:53:00]
has to be
it has to be dealt with. Being quiet
[1:53:04]
doesn't work with bullies. And I'm not
saying anyone person is just a bully or
[1:53:09]
that's just one thing.
People are complex, but bullying
[1:53:13]
behavior, I should be saying, not
bullies. Bullying behavior has to be
[1:53:18]
confronted. And you guys are doing the
right thing. And I know it's hard, but
[1:53:23]
what has been happening and what I've
heard is very wrong. I can't help but
[1:53:29]
judge it morally, but I'm happy my tax
dollars are being spent to try to stop
[1:53:35]
it. and to protect these city employees.
>> Thank you, Nancy. Is there any other
[1:53:42]
member of the public that would like to
comment on the substance of the report
[1:53:46]
as uh articulated by uh Commissioner
Gossip?
[1:53:53]
Mr. Perry,
[1:53:58]
uh Richard Perry, resident of the city.
Uh, I can't say how
[1:54:04]
much I agree with what Nancy said. It
all it almost doesn't need anyone else
[1:54:09]
to comment, but I do want to say
that having been an owner of many
[1:54:16]
businesses over the years in my career,
nothing was more disturbing as as a
[1:54:22]
senior executive, as a general counsel,
as chief operating officer, than to
[1:54:28]
learn that an employee was being
harassed by anyone within the
[1:54:32]
organization.
That is totally inappropriate.
[1:54:36]
As as you have said, it damages the
efficiency of of the business and the
[1:54:43]
city is a business and it is not immune
from uh having to abide by the statutes
[1:54:52]
that apply to harassment in the
workplace. And so I commend you for what
[1:54:57]
you have done. And although the public
hasn't yet seen the report based on what
[1:55:02]
we heard here today, I believe that you
are doing exactly the right thing to
[1:55:07]
correct this situation.
>> Thank you, Mr. Perry. Anybody else?
[1:55:11]
Members of the public commenting on
substance of the report.
[1:55:16]
Uh if not,
[1:55:21]
uh I'm going to close public comment
right now, right at this moment. Uh and
[1:55:25]
Commissioner Good, you will now be given
the opportunity to speak to be followed
[1:55:30]
by a vote to by these commissioners
uh by all commissioners to uh vote to
[1:55:37]
accept the findings of the report and
adopt and implement the recommendations
[1:55:42]
contained therein. That vote would
follow your thing. You are now
[1:55:46]
recognized to speak. You do not have an
infinite amount of time. Uh I do uh have
[1:55:53]
the power to uh uh stop you at certain
point. Go ahead.
[1:55:58]
» Okay. Well, as per usual, I've been
blindsided by a number of things. I was
[1:56:05]
not informed in in late June that this
had gone under contract. Normally, that
[1:56:13]
would have should have gone to a vote of
the board of commissioners whether to
[1:56:17]
investigate one commissioner. I only
learned of the existence of this report
[1:56:23]
when the agenda for today's meeting was
published a week ago on August 14th.
[1:56:28]
Maybe one of the reasons I've sent
multiple emails is when I asked I said
[1:56:33]
you're not going to pub this is this
report may I may I see it? Well, I got
[1:56:38]
no response. And [clears throat] then
once I finally was told on Wednesday
[1:56:42]
afternoon, August 19th, that I could
pick up my co copy on Thursday morning
[1:56:48]
the 20th
um at that point when I once I saw it
[1:56:53]
because it's riddled with inaccuracies,
misrepresentations, and everything else.
[1:56:58]
Um I never got a response as to whether
it I said this can't release this to the
[1:57:04]
public. Well, lo and behold, behind
closed doors, they had made arrangements
[1:57:09]
already to do that. The overarching
problem here, and these two employees
[1:57:14]
are the top two administrators in the
city. Uh the there's sort of this this
[1:57:20]
implication that I somehow was abusing
other employees. But first of all, I
[1:57:25]
wasn't abusing those two employees. I
never I didn't get answers. I had one
[1:57:31]
refusing to reveal settlement terms.
terms of what I was trying to bring a an
[1:57:36]
end to the to to bring or get
negotiations going for the city manager
[1:57:42]
report. And then weeks later, she
finally relented when she realized it
[1:57:46]
was illegal to withhold those terms from
from the entire board. They just those
[1:57:52]
terms had only been shared with a select
number of commissioners. Foyer was meant
[1:57:56]
to protect citizens from government
overreach and to assure transparency.
[1:58:02]
FOYA which has been you weaponized here
against me was not designed to to to use
[1:58:08]
information against elected officials
and yet that is what the Rahobath beach
[1:58:12]
government has done with Foya. They have
weaponized it. Um selected officials
[1:58:19]
went ahead and contracted for this
investigation in June of 2026. I had no
[1:58:24]
idea because apparently they they
decided we're allowed to just use this.
[1:58:29]
It seems like a misuse of taxpayer money
not to have sought the approval of
[1:58:34]
people to conduct an investigation. And
when an investigation is an attorney up
[1:58:40]
in Wilmington looking at emails who
never dains to contact me, who never
[1:58:45]
contacts me, obviously it's a one-sided
investigation. Let me give you one
[1:58:50]
example. You're going to read this
salacious report tonight. Maybe one of
[1:58:55]
them, Mr. Tedar talks about a December
2024 phone conversation he and I had. I
[1:59:02]
happened to be in San Francisco. He I
believe was was here in Rahobit. And he
[1:59:07]
alleges that I said a number of things,
but he omits the fact that I said that
[1:59:13]
someone on next door said these things.
That is not equivalent. My words have
[1:59:18]
been twisted. That's just one example.
Um and so there was no due diligence to
[1:59:24]
a report. This seems like the
investigating attorney never never got
[1:59:30]
my side of anything. I was never given
the opportunity to defend myself. I'm
[1:59:35]
just sort of gobsmacked by this whole
thing. Some commissioners had access to
[1:59:39]
this report before I did. I was not
allowed. I was told on late Wednesday
[1:59:43]
afternoon I could pick it up Thursday
morning. So the um I can't the the the
[1:59:50]
the in that case the city manager claims
in the report that he's paraphrasing my
[1:59:56]
words but he does so so inaccurately
that he imputes uh ill intentions to me
[2:00:02]
or that he imputes that I'm t talking
about
[2:00:06]
» that's so good. Would you listen for a
minute? Would you just listen for a
[2:00:09]
minute? uh gave an introduction at the
beginning of this meeting that we're not
[2:00:13]
relitigating this. Uh we're not reoping
the best.
[2:00:17]
» This is my opportunity to defend myself
because you have done this behind closed
[2:00:23]
doors. I you hire an attorney who never
speaks to me when I can you imagine if
[2:00:29]
an investigator was investigating
something and never spoke to the person
[2:00:34]
whom they were investigating. That is a
complete
[2:00:37]
» You have two two more minutes. So use
wisely.
[2:00:40]
» Words have been attributed to me which
aren't mine. Emails are taken out of
[2:00:46]
context completely. And there's uh Mr.
Teder uses one particular email from
[2:00:52]
February 2025 repeatedly in which I
wrote to a constituent and and said in
[2:00:59]
the subjunctive tense that some people
would say that and he needs they need to
[2:01:04]
rely on one email from February 2025 as
somehow proof that I that I would speak
[2:01:12]
using that language and I rarely curse
or or use any vulgar words in emails.
[2:01:17]
So, it's sort of they're building a
narrative that is inconsistent with how
[2:01:22]
I behaved. Let me give you an example of
my attempts to move the news stands and
[2:01:27]
then just a couple days ago asking
why the pagod on the boardwalk we where
[2:01:34]
we were supposed to put the news stands
hasn't been returned but instead rocks
[2:01:37]
are being placed by the ballards and I
get no response. That was 48 or 72 hours
[2:01:44]
ago. So obviously my job has gotten
gotten very frustrating and when I
[2:01:48]
received no answers from either Mr.
Tedar or the city solicitor, I have had
[2:01:53]
to email them repeatedly. For them to
say that's abuse is a stretch. I'm not
[2:01:59]
done.
>> Um more generally by by any questions of
[2:02:04]
accountability
>> Commissioner Good, the mayor has called
[2:02:08]
time. Um I I'm I'm left uh you know
shocked and obviously um the way this
[2:02:15]
has been handled is
commissioners feel that I'm being forced
[2:02:20]
to I have spoken to a lawyer or I spoke
commissioner good
[2:02:25]
» the city is bringing along onto itself
by their please discontin
[2:02:31]
» thank you commissioner good
>> I will now entertain a motion
[2:02:36]
» mayor I'd like to accept the to accept
the findings of the report and adopt and
[2:02:41]
implement the recommendations contained
therein with a date to review compliance
[2:02:47]
at the board of commissioners meeting on
October 16th.
[2:02:51]
» So moved.
>> No. Do we have a second?
[2:02:55]
» Second. Uh we have a motion and a second
to uh uh accept the accept the findings
[2:03:02]
of the report and adopt and implement
the recommendations contained therein
[2:03:07]
with a date to review compliance at the
board of commissioners uh meeting on
[2:03:12]
October 16th
>> uh
[2:03:17]
no who who said that
[2:03:23]
» 20 October 23rd at a at a future meeting
date to be determined.
[2:03:32]
Is it the 23rd?
>> I believe it's the 16th. Let's see here.
[2:03:39]
» 16th.
[2:03:43]
» It's the third Friday is the 16th of
October.
[2:03:47]
» October.
>> October. The original motion stands. Uh
[2:03:51]
all those in favor signify by saying I.
I.
[2:03:54]
» I. Those opposed, we'll let the record
show that uh that Commissioner Good left
[2:04:01]
the room at uh
4:04
[2:04:05]
p.m. uh and did not vote. Uh with that,
the results of the vote were uh six
[2:04:12]
present commissioners voting yes in
favor uh and one absent.
[2:04:18]
» Uh state may I make a statement?
>> Yes. Thank you. May I
[2:04:23]
» Yeah. Are you
>> point of order, mayor? Um I we voted to
[2:04:29]
release this without the exhibits and
the exhibits are all redacted. I don't
[2:04:35]
understand since um Commissioner Good
has raised an issue that she wasn't
[2:04:40]
interviewed, but these are all her own
words. Why wouldn't we be releasing this
[2:04:46]
with a report? I'm confused.
[2:04:54]
I I know that was discussion between
them. That's why I'm looking at Lisa.
[2:04:57]
Are you okay with Okay.
>> So, I would enterain May I make make a
[2:05:02]
motion that we release the report.
>> We have a motion on the floor first.
[2:05:07]
Sorry.
>> Don't we need to do procedure? Let's
[2:05:10]
Let's do this.
>> Actually, we've already voted.
[2:05:14]
[laughter]
>> I thought we voted.
[2:05:16]
» We already voted.
Now,
[2:05:18]
» may I make a motion to release along
with the report the exhibits that came
[2:05:23]
with the report?
>> Seconded.
[2:05:25]
» We have a motion in a second to uh to
release the uh exhibits as part of the
[2:05:32]
uh public
uh release. What? Help me with wording.
[2:05:37]
[laughter]
>> Take a vote to be able to to release
[2:05:41]
with the exhibits. You've already
motioned to release the report. So, it's
[2:05:44]
a motion to include the exhibits with
the prior approved release of the
[2:05:48]
report.
>> You got that. Can you restate that?
[2:05:54]
» You [clears throat] do it.
>> I think m point of order. I think that
[2:05:56]
the original uh motion was, if I may
repeat it, I would like to make a motion
[2:06:01]
to accept the findings of the report and
adopt and implement the recommendations
[2:06:04]
contained therein. The new added aspects
of uh to be reflected or reviewed on
[2:06:09]
October 16th. So the findings of the
report generally include the exhibits.
[2:06:14]
So I don't think that the motion
excluded the exhibits. It spoke of
[2:06:18]
finding of the report.
>> The original did
[2:06:22]
» motion to wave attorney client
privilege.
[2:06:24]
» Correct.
>> Excluded the exhibits. So now we're
[2:06:29]
undoing that.
>> Just adding the exhibits.
[2:06:33]
» You don't need to undo it. Just a motion
to
[2:06:34]
» I think just call the question. So we
have a motion and a second to release
[2:06:40]
the exhibits as part of the waved
attorney client privilege.
[2:06:43]
» So moved.
>> Seconded again.
[2:06:47]
» It's all [laughter]
>> okay.
[2:06:48]
» Okay. All those in favor uh signify by
saying I
[2:06:52]
» I. Those opposed. And uh the motion
carries uh unanimously. 6 to zero.
[2:07:00]
» Um [clears throat]
make a statement
[2:07:01]
» with that. Uh I'd like to
>> Can I make a statement real quick? Yes.
[2:07:05]
Just just for the public, I I wanted to
make a statement. The the exhibits in
[2:07:08]
the report are redacted. Um the
information here today is employee one
[2:07:12]
and employee 2. I just want to be clear
that any statements made by uh
[2:07:18]
Commissioner Good or her assumptions as
to who they are. That may be able to be
[2:07:22]
figured out at your own. Um but uh that
was not uh anything that the
[2:07:27]
commissioners here included in their
report and the copies that you received
[2:07:30]
will be redacted. Um and so I just want
to make that announcement. I also wanted
[2:07:34]
to encourage everybody to look at the
civility code. Um it does say that these
[2:07:39]
proceedings will be public. Um and in
addition, the commissioners uh looked
[2:07:44]
into the foyer rules regarding this um
that mandate this sort of situation be
[2:07:48]
in public. Um so I just want to make
that clear for the public as to why that
[2:07:52]
was done here today in this manner.
Thank you all.
[2:07:56]
» Uh thank you. Now, I'd like to make uh
make my statement and hi Suzanne who
[2:08:01]
will be watching this at some point, I
hope. Uh uh I have been caught up in all
[2:08:08]
this nastiness for almost two years
dating back to the election of Suzanne
[2:08:13]
Good to a commissioner seat. I am
wrapped up in this disturbance likely
[2:08:18]
more than the other commissioners
because of my role as mayor and because
[2:08:22]
I too have been the recipient of
commissioner goods univil behaviors
[2:08:27]
both direct and by being copied on
emails or texts or voicemails sent to
[2:08:33]
the city manager or sent to the city
solicitor
[2:08:38]
or sent to staff commissioners even
other constituents.
[2:08:43]
I've been the author of multiple cease
and assist directives directed to
[2:08:48]
Commissioner Good which have attempted
to abate her univil uh abate her univil
[2:08:55]
behaviors and to suggest she seek self's
restraint and remediation but to no
[2:09:02]
avail.
In fact, her intensity of belligerance
[2:09:06]
only escalated and is at an unacceptable
level which can no longer be tolerated
[2:09:13]
and should never have been tolerated
from the beginning.
[2:09:18]
And so I believe we have come to the
point where we must take the most severe
[2:09:22]
action we can take at this time to end
Commissioner Good's intentional lies
[2:09:28]
in harassment
with the facts and recommendations
[2:09:33]
contained in this report before us. What
we are doing is putting up barriers to
[2:09:38]
protect our employees from continuing
harassment. almost two years worth of
[2:09:45]
verifiable, documentable,
and hurtful incivility
[2:09:50]
generated by Commissioner Good. Her
vitriolic actions have been directed at
[2:09:56]
city staff, including the multiple
people in building and licensing,
[2:10:02]
our HR director, our communications
specialist,
[2:10:08]
our city manager, our city solicitor,
our interim city solicitor, our
[2:10:13]
commissioners, and our mayor. All the
while, she knows her actions are
[2:10:18]
wrongful.
multiple adminitions and cease and
[2:10:23]
desist directives authored not just by
me as mayor but also by the city manager
[2:10:29]
and by the city solicitor have not
gotten through to her.
[2:10:35]
If we were an HOA board, there would
likely be a bylaw establishing commiss
[2:10:40]
conditions for expelling a board member.
Unfortunately for us, removal of an
[2:10:46]
elected official is not that easy. And
so we have to resort to hiring an
[2:10:52]
outside lawyer at additional expense to
examine the behaviors of commissioner
[2:10:58]
good and then to provide recommendations
for how to remediate such uncivil
[2:11:03]
behaviors.
I want to note that this has never been
[2:11:08]
about differences of opinion on issue,
but rather it is solely about univil
[2:11:13]
behaviors with much of the time can be
characterized as mean-spirited and nasty
[2:11:21]
and which again in the case of
Commissioner Good are well documented in
[2:11:25]
emails,
next door postings, videos, texts,
[2:11:30]
voicemails as the reference report
attests. to
[2:11:35]
all municipal elected officials in
Delaware take the same oath.
[2:11:40]
It is so important that it is embedded
in the Delaware Constitution.
[2:11:46]
Article 14 section one. When elected,
she stated, "I,
[2:11:53]
Suzanne Good, do proudly swear or affirm
to carry out the responsibilities of the
[2:11:58]
office of commissioner of the city of
Rahit Beach to the best of my ability,
[2:12:03]
freely acknowledging that the powers of
this office flow from the people I am
[2:12:08]
privileged to represent. I further swear
or affirm always to place the public
[2:12:13]
interests above any special or personal
interests and to respect the right of
[2:12:19]
future generations to share the rich
historic and natural heritage of
[2:12:24]
Delaware.
Continuing in doing so, I will always
[2:12:29]
uphold and defend the constitutions of
my country and my state. So help me God.
[2:12:35]
This oath is the basis upon which we
carry out our duties. Serving is a
[2:12:41]
privilege.
The public interests are paramount.
[2:12:45]
But most importantly, the
responsibilities of a commissioner
[2:12:49]
require fidelity to our own municipal
code
[2:12:54]
which mandates civility and courteous
behavior and prohibits harassment.
[2:13:00]
The perspective of the I'm sorry, the
peververate
[2:13:05]
univil, discourteous, and harassing
behavior must cease. By code, the city
[2:13:11]
mandates that applicants for business
licenses
[2:13:15]
have a reputation for operating their
business in an honest manner.
[2:13:20]
City code section 125A,
120-5A.
[2:13:27]
How can we demand businesses act
honestly yet tolerate mistruths
[2:13:32]
from a sitting commissioner
through her lies and ill treatment of
[2:13:37]
city staff and well most everyone that
who contradicts her.
[2:13:44]
Commissioner Good has violated her oath
of office and has disgraced the position
[2:13:48]
of commissioner and she should resign.
But as we the board of commissioners
[2:13:55]
lack the power to force resignation,
I support the recommendations of the
[2:14:01]
report in front of us. I have supported
it
[2:14:04]
and believe the public should witness
the report content and judge for
[2:14:10]
themselves.
And so I voted in favor of waving
[2:14:14]
attorney client privilege, releasing the
report to the public with exhibits, and
[2:14:21]
adopting and implementing the report
recommendations.
[2:14:25]
Frankly, I think tonight's behavior
should be a good demonstration to
[2:14:30]
everybody
of what we've had to go through and deal
[2:14:35]
with for the past two years.
So to conclude,
[2:14:43]
the board has retained an independent
investigator to review the complaints
[2:14:47]
that were presented to the city. The
investigation has been completed.
[2:14:52]
Personnel committee has reviewed the
resulting report and the mayor and
[2:14:56]
commissioners have now acted upon it.
the city manager will ensure that the
[2:15:01]
report without uh without exhibits now
with exhibits is made available to the
[2:15:06]
public consistent with the action taken
by the board. So again uh by
[2:15:13]
the next hour or so uh the
now public report will be uh embedded
[2:15:23]
into the agenda.
[2:15:27]
Um,
did you have
[2:15:32]
I don't read lips from 20 ft. [laughter]
[2:15:42]
» Um,
[2:15:47]
thank you all. Thank members of the for
of the public. Uh we
[2:15:55]
we conclude that uh section of the
agenda. We move on to future agenda
[2:16:00]
topics. Uh if anybody uh you know
they're embedded in the agenda if
[2:16:05]
anybody has any questions or wants to uh
uh add something to the agenda certainly
[2:16:10]
see Taylor Tedar. Uh with that uh review
future meeting dates. uh Taylor uh
[2:16:17]
indicated at the beginning of the
meeting uh that because of Labor Day on
[2:16:21]
a Monday uh our meeting will be switched
to Tuesday, September 8th. That's a
[2:16:28]
commissioner's m meeting. That's at 9:00
a.m. Subsequent to that, uh please note
[2:16:33]
that uh Friday, September 18th is our
regular meeting and that's our
[2:16:38]
installation of our newly elected uh uh
commissioners and mayor. Uh and that
[2:16:44]
meeting begins at uh two o'clock. With
that uh is there any additional citizen
[2:16:49]
comment uh that anybody would like to
make.
[2:16:55]
[laughter]
>> Nancy Doyle 202 Country Club Drive. This
[2:16:59]
is a yellow and chocolate cake from
Pascalini Bakery. It's not a celebratory
[2:17:05]
cake. I saw the agenda in advance, but I
think like food is a important bonding
[2:17:11]
experience. And yes, I should be
bringing vegetables, too. I'm working on
[2:17:14]
it. But this is a great piece of cake,
and I was hoping every commissioner
[2:17:19]
could be here to have a piece of it, but
it's I would have shared it with all of
[2:17:24]
them. Um, so a little bit of a sad day
that this had to happen, but a good
[2:17:30]
cake. So, a healing cake I present to
you.
[2:17:34]
» Thank you, Nancy. Anybody else members
of the public comment? Uh if not, uh are
[2:17:42]
there any commissioner announcements?
Uh very good. Uh with that, there being
[2:17:47]
no further business, I adjourn this
meeting at 4:17 p.m. Thank you
[2:17:52]
everybody.