Me, we'll come to order. If y'all would please rise for the invocation.
[0:08]
The Lord's Prayer. Our Father, who art in heaven, hallowed be thy name.
[0:13]
Thy kingdom come, thy will be done on earth as it is in heaven.
[0:18]
Give us this day our daily bread, and forgive us our trespasses, as we forgive
[0:23]
those who trespass against us. And lead us not into temptation, but deliver us from
[0:29]
evil. For thine is the kingdom, the power, and the glory, forever and ever. Amen.
[0:35]
Pledge of Allegiance. I pledge allegiance to the flag of the United States of
[0:40]
America, and to the republic for which it stands.
[0:44]
One nation under God, indivisible, with liberty and justice for all.
[0:50]
Thanks. Please be seated. Thank you all for being here this evening.
[0:53]
Yes, sir, you've got a mic. You want to bring it up?
[0:55]
Mayor, if we may, I'd like a motion to amend the agenda to
[1:01]
have an executive session concerning the multi-track.
[1:06]
So moved.
[1:07]
All right, that's a motion and a second. Any other discussion?
[1:10]
Did you want to go any more than that?
[1:12]
No, I don't.
[1:12]
That's fine. Yes, sir. That's a motion and a second. Thank you.
[1:15]
All in favor of that motion, say aye.
[1:16]
Aye.
[1:17]
Aye. Opposed, the noes have it. Our first item on the agenda would be a draft
[1:20]
Downtown Master Plan RFQ presentation. Mr. Rucker, yes, sir.
[1:26]
Thank you, Mayor, Council. We have yes RFQ on board
[1:32]
there.
[1:35]
So let's walk through this, and we'll tell you what we changed, what we added,
[1:39]
what's different,
[1:41]
and then we'll elicit your responses.
[1:45]
We will hopefully, at the end, have an RFQ that you're happy with, that we could
[1:51]
move forward for announcement to
[1:56]
provide feedback from consultants. Right?
[2:00]
First off, we're going to change a couple of things on that front page, just to
[2:05]
kind of help you be... We're going to bump the deadline response Friday, October
[2:10]
16th. We thought just to give a little bit more time. It says the 2nd right now.
[2:14]
Thought give it a little bit more time.
[2:17]
Okay, so that's the one thing. We're going to add a website link on as well to bid
[2:21]
so that folks can see it, find the link immediately, and then see the
[2:27]
RFQ. Okay. So,
[2:31]
I'm just going to go through this, and you stop me at any point in time, but I'll
[2:37]
just roll through and tell you what we did here.
[2:38]
So we've incorporated the vision throughout the
[2:44]
RFQ, as expressed from comments that we've received all through
[2:50]
this process, really starting at the March MASC Busbee Tree,
[2:56]
last week's workshop especially, and then the comp plan that I think is already in
[3:02]
there, and that's especially noticeable in the historic downtown district.
[3:08]
Sorry, let me back up a minute. We expanded the planning areas to include the
[3:13]
Jasper County Courthouse and surrounding neighborhood, town hall, where we are
[3:17]
tonight. We elongated the segment along Green Street
[3:23]
and extended out Ramseur Road, right to Bee's Creek, that additional portion where
[3:28]
it transitions from Main Street.
[3:32]
We also added right here, a market guide.
[3:37]
So that was provided to the town by Retail Strategies, and it's got some
[3:43]
good information, demographics, and market information data that's in there.
[3:48]
We wanted to include that.
[3:51]
We took the three distinct planning areas.
[3:55]
Remember, it's the historic
[3:58]
downtown, Jacobs Smart Boulevard, and Exit 21, and we tailored those with
[4:04]
anticipated services and deliverables.
[4:07]
So as you work through this, it's more refined.
[4:11]
We also added a three-phased project schedule to the scope of work
[4:16]
for each separate planning area. So we envision historic downtown
[4:22]
first, a three-phase process, as well as Jacobs
[4:28]
Smart, and then finally Exit 21. The idea would be let's emphasize the focus
[4:34]
for downtown first, then we'll move out to Jacobs Smart, and then we'll go finally
[4:38]
out to
[4:41]
Exit 21. The phasing, phase one is this assessment of the
[4:46]
data, a SWOT, strengths, weaknesses, opportunities, threats, to sort of accumulate
[4:51]
all that information with the future consultant.
[4:55]
Phase two is then gathering that and creating a plan to achieve the goals that
[5:01]
we're trying to get to. That's phase two.
[5:04]
And then finally, phase three would be to adopt and implement.
[5:08]
So the idea is, again, for each of these districts, there's a phased approach, and
[5:12]
we're communicating with council, or we're communicating with the public.
[5:16]
We're in a robust public engagement, and that's being
[5:22]
workshopped with you all, and it's been shared.
[5:24]
And when we get to a final okay, that's the phase three. One, two, three. Right?
[5:34]
We have enhanced, if it wasn't clearly articulated, it is now,
[5:40]
about a robust community engagement request.
[5:44]
So we want to make sure we're including the merchants
[5:49]
in all the areas. Not just downtown, all the areas.
[5:52]
And the investors, like Richmond Development Group, for example.
[5:55]
We want those folks providing input along the way.
[6:00]
And we also are emphasizing immediate actions.
[6:04]
What can we do immediately in kind of day one, short term, and then more long-term
[6:10]
visions in those deliverables. Okay? So we start with the historic downtown.
[6:16]
In the historic downtown, I'll just go through what we're expecting in terms of
[6:21]
actionable items or deliverables. It's the same.
[6:26]
So we want to create or modify existing ordinances. Right?
[6:30]
So we talked about architectural regulations. We want to hit that.
[6:34]
Which produce the town's preferred architectural styles.
[6:38]
We're going to talk about signage, storefront window regulations.
[6:43]
What can we do there? Historic protections for residential and historic commercial
[6:48]
buildings. Town used to have an overlay, it was the Craftsman bungalow
[6:54]
overlay. Right. Which helped with historic architectural
[7:00]
revitalization. We can talk about bringing something like that back.
[7:05]
We want to explore Main Street South Carolina program. Right?
[7:07]
We talked about this program. How can we leverage that and those resources?
[7:13]
We want to review our zoning standards, particularly T4 and T5.
[7:16]
Can we make some improvements?
[7:20]
We want to
[7:21]
elicit or receive recommendations of how the town can better accommodate
[7:27]
redevelopment and infill for private investors.
[7:32]
We want to do immediate steps. What can we do immediately to beautify the historic
[7:38]
downtown area?
[7:41]
We would like to evaluate what buildings, maybe the entire historic core, that
[7:45]
could be added to a national register of historic places. Right?
[7:49]
We just want some input on that. And with all three of these, we want to consider
[7:55]
what the town can provide in the public realm to enhance the private side
[7:58]
revitalization. What can the town do?
[8:01]
What can we control on the public side to help drive reinvestment?
[8:06]
So that's historic downtown. Jacobs Smart Boulevard.
[8:09]
We want to re-envision a Jacobs Smart Boulevard. Right?
[8:13]
And again, the keyword is re-envision, as it were to function as more of a walkable
[8:19]
Main Street-type destination. Unique turn lanes at major intersections, just
[8:24]
re-envisioning how that roadway might look.
[8:29]
Now, that's going to take a
[8:31]
lot of work. Right? If we envision something that's different in that roadway, we
[8:35]
know SCDOT owns it. That can be a heavy lift, but we're at least painting the
[8:40]
vision, right, of where we're trying to achieve
[8:44]
as we move forward.
[8:47]
And it'd be like with a consultant, from a
[8:49]
consultant. Again, review the zoning
[8:55]
ordinances for T4, as well as any pending and enacted ordinances on related issues
[9:01]
like architecture, signage. We want to optimize them for that corridor.
[9:06]
We'd like to identify opportunities to enhance the street grid, improve
[9:10]
walkability, connectivity, beautification
[9:16]
We want to identify these sort of store sites or buildings that might serve as
[9:21]
catalysts, so we can build off them.
[9:23]
And in the end, what can we do in the public realm to enhance revitalization?
[9:28]
So finally, Exit 21.
[9:31]
What would East Main Street look like redesigned as, again, a more
[9:37]
walkable Main Street type vibrant gateway, because it is a gateway, that
[9:42]
prioritizes transformative placemaking and public amenities?
[9:48]
So how can
[9:50]
we reorganize those areas as it redevelops?
[9:54]
We want to
[9:56]
connect the dots. What's working out there?
[9:58]
How do we bring that in, like Route 2 Memorial Park, Blue Heron Nature Trail.
[10:03]
We want to talk about dog parks. We want to bring all of that into the mix of what
[10:08]
we're trying to achieve in this corridor.
[10:11]
Review the zoning standards.
[10:14]
We want to look at
[10:18]
addressing non-conforming auto-oriented uses of the corridor, and recommendations
[10:23]
on how we should address that or future possibilities of revitalization.
[10:28]
Again, what can the town do in the public realm to help this whole effort?
[10:35]
What we're looking for from a consultant. A firm to come in and do this.
[10:39]
Somebody who's demonstrated experience preparing downtown master plans, form-based
[10:44]
code amendments, overlay districts, historic downtown design standards, projects
[10:49]
involving traditional architecture and new urbanism, and implementation strategies
[10:54]
for small towns like us. Bringing that kind of experience to the table.
[11:01]
We want to make sure that firms recognize and understand that they're going to need
[11:04]
to present to you all their qualifications and their approach prior to the final
[11:10]
selection. So that's boiled down from this document
[11:16]
into
[11:18]
what I just gave you.
[11:22]
Did we miss anything? Are we hitting the right spot?
[11:31]
Are we close or not?
[11:33]
Yeah, I think you've got the right vision here.
[11:37]
We've got a plan. At least it feels like, hey, we're going to start here and work
[11:41]
through the steps, and then we'll go on down.
[11:44]
And is this all going to line as far as the timeline with when
[11:49]
the Exit 21 is actually completed?
[11:53]
I'm just curious how that's all going, because
[11:56]
if we go and revitalize the 21, and say they haven't came through yet to do the
[12:02]
construction. I just didn't want to be on top of everybody while we're trying to
[12:05]
get it done as well.
[12:07]
Right. That's a good question. Yeah.
[12:09]
Right now, DOT estimates that they're going to put that out for bid
[12:15]
about this time in 2028. So that leave you at an adequate time.
[12:22]
Not only that,
[12:25]
in terms of wayfaring signage and what we want to do, we still have the final say
[12:30]
in terms of what DOT does for Exit 21.
[12:34]
So no, that's a great point, but I think the way everything aligns is probably
[12:40]
we're not going to get until farther 2029, so we really have to address those
[12:45]
questions in terms of what kind of signage you want.
[12:52]
Well, and I think it's one of those things that we have the plan in place, but we
[12:55]
may not put up the signs until we know that 95 has come through.
[12:59]
Right.
[12:59]
But we can go ahead and get the plan in place and work on both sides of the
[13:02]
interstate in the meantime.
[13:05]
And I believe starting with Main Street also, that's the right call.
[13:08]
I think we go to Main Street, we'll start right at our front door, right at home
[13:13]
base and work out from there. I think that's a great idea.
[13:17]
Yes, sir.
[13:21]
To me, this is more of a visionary thing.
[13:24]
I don't see
[13:28]
actually implementation or some beginnings of this program, but it's going
[13:34]
to take years to do this. So, I don't see what...
[13:39]
Oh.
[13:40]
Did you all consider
[13:44]
timing, or
[13:47]
you put any estimates, or is that something you want the...
[13:50]
And there's all kind of factors that are going to impact that.
[13:54]
There's going to be the economic factor, there's going to be so many things that
[13:57]
are going to impact how fast this might happen.
[14:00]
It's more creating a vision of what this council wants to see happen.
[14:06]
It is.
[14:06]
And then starting down a path that accomplishes those goals.
[14:13]
Right. Yes, ma'am?
[14:15]
No, I'm hoping that this group is going to give us a roadmap or a timeline
[14:21]
of, "I would focus on this. I would do this. Here's your order.
[14:23]
Here's your roadmap." And then it's up to us to make that happen.
[14:29]
Yes, sir.
[14:32]
But along with that, and I think what's interesting here is that there's a lot of
[14:37]
the smart code that's going to have to be
[14:40]
modified
[14:42]
to implement this plan or incorporate.
[14:47]
Oh, yeah.
[14:50]
Yes.
[14:52]
Can you do one more? The
[14:56]
good thing is a lot of smart code is there already, and really it's underutilized.
[15:03]
There could be more that the smart code allows.
[15:09]
It needs to be tweaked, yes. And I'm hopeful and anticipating
[15:15]
suggestions on how to strengthen it, but I think we're coming
[15:21]
from a good base already. No doubt it's got to be revised.
[15:24]
There's got to be some revision.
[15:28]
Hang on, hang on. You want to say more?
[15:30]
Go ahead.
[15:31]
Yeah, actually,
[15:33]
it's kind of buried in the fine print, but if you look at the core deliverables,
[15:39]
recommended projects with priorities, in other words, how we want to phase things.
[15:45]
An ordinance code audit, which I think is important so you could find
[15:49]
inconsistencies in the smart code.
[15:51]
I know you and I have talked about that for quite some time.
[15:55]
Ordinance-ready overlay smart code language, so it would be teed up and ready for
[16:01]
the council to adopt, if that's the direction they want to go.
[16:06]
You can also take examples of what others have done.
[16:09]
If you look at--
[16:12]
I'm just going to use what they had that downtown master plan, and
[16:18]
thanks to the doctors and I think with the demographics and the number of people
[16:23]
moving to our area, I could see it going pretty quickly.
[16:29]
I know the Municipal Association has a program for downtown
[16:35]
revitalization. And obviously they've engaged with firms or
[16:41]
businesses that do this type of work. How are we going to advertise?
[16:46]
Are we just going to put it on our website and ask for proposals, or how are we
[16:51]
going to approach...
[16:54]
Sometimes there's no need to reinvent the wheel.
[16:56]
If we've got people that have done this for other like communities, perhaps they're
[17:00]
a good fit for us. And I just don't want to miss somebody that might be good for
[17:05]
us.
[17:07]
South Carolina business opportunities will be putting it out to some professional
[17:13]
planning organizations. So we're going to cast a wide net on it.
[17:18]
I think firms are pretty hungry for this type of work because this is really
[17:24]
interesting stuff, generally speaking.
[17:26]
So we anticipate we're going to have a pretty big...
[17:32]
And one last question. Did we fund any monies in our current year budget for this
[17:38]
money?
[17:38]
We sure did.
[17:39]
Okay. I'm not going to ask you what that is, but okay.
[17:42]
Yeah, I don't want to give that away just yet.
[17:44]
Okay.
[17:44]
But just remember that when we go through the selection process, you all will have
[17:48]
the opportunity to negotiate directly with the firm.
[17:52]
Obviously, staff will help
[17:56]
make that process manageable, but we want to make sure.
[18:00]
It's the old saying, do we have a champagne taste on a beer
[18:06]
budget? We want to make sure we get the best bang for our buck.
[18:11]
Sure.
[18:14]
Is that everything? Or well, curious, do you all want staff to take the lead on the
[18:20]
scoring?
[18:22]
... um, to get those consultants before you to then make their pitch?
[18:27]
Or do you want to be more part of that process from the beginning?
[18:32]
How do you want to handle that?
[18:34]
Mm-hmm.
[18:34]
I mean, I have no idea how many proposals we're going to get, but assuming you do
[18:38]
get a hefty amount, I would say if you could bring the top three to council with
[18:43]
your scores and explain why you scored them the way that you did, and then we have
[18:47]
time to review them, that would be helpful.
[18:48]
Yes. All right. That's a good plan.
[18:51]
We should set up your finalists,
[18:55]
and maybe have them come and meet with this directive council.
[18:58]
I'm sure they would, so that would be interesting.
[19:03]
Yes, sir.
[19:04]
And just keeping in mind, too, the enthusiasm that the original development group
[19:08]
had the last meeting when they-- or the workshop when they came in.
[19:11]
Let's try to keep them in mind because you may see it from different angles, inside
[19:17]
looking out, outside looking in. They're just totally different ideas that may
[19:20]
work, so I say let's use all resources.
[19:22]
I have to run that by the desk, yeah.
[19:24]
Right. We need to keep them in mind.
[19:29]
I would say, I've just seen some suites today, and I was talking with
[19:35]
Christian Gesen, Councilman Gesen, so we're definitely communicating.
[19:41]
We'll definitely bring them to the table.
[19:46]
If there's nothing else for them, I think then thank you very much.
[19:50]
Thank you very much.
[19:51]
Thank you.
[19:54]
Next item will be our public comment time. Happy to hear from anyone.
[19:59]
There's no public comments, then I will move to a reading and approval of August
[20:03]
20th meeting, and I'll make that motion.
[20:05]
Second.
[20:06]
All in favor say aye.
[20:07]
Aye.
[20:07]
Opposed, no ayes, have it. Our next item would be item number two, a resolution of
[20:10]
the original town council approving surplus of a 2017 Caterpillar mini excavator
[20:16]
and purchase of a 2026
[20:22]
Caterpillar mini excavator for the water department. Yes, Mr. Hammond?
[20:24]
Thank you, Mr. Mayor. Your ATEX committee met
[20:30]
a week prior. They gave their recommendations to your council.
[20:37]
I did distribute that to the council a week ago, so you had time to consider those
[20:42]
recommendations. We had considerably less money to distribute this
[20:47]
year. I think we all know why. I'm not going to get into that.
[20:51]
But on a positive note, we did have some funds that were not expended that come
[20:56]
back. So the total to distribute is a little higher,
[21:03]
roughly $20,000, $21,600 higher.
[21:08]
So the total to distribute this year is $45,635 just
[21:14]
for that.
[21:17]
We asked applicants Friends County Hill, Gopher Hill, Keep Jasper Beautiful, the
[21:23]
Morris Center, Operation Patriots, FOT, and you
[21:29]
have the appropriate recommendations corresponding with the appropriate
[21:34]
recommendation for each.
[21:40]
With that, I'll
[21:42]
yield the floor to any questions you may have.
[21:46]
Were there any other requests aside from these? These were the only requests?
[21:51]
Then I make a motion we approve the disbursements of the ATEX money
[21:56]
as prescribed in this ordinance.
[22:01]
I'll second the motion. Any other discussion?
[22:05]
All in favor of that motion say aye.
[22:07]
Aye.
[22:07]
Aye. Opposed, no ayes, have it. Our next item would be number two, a resolution of
[22:11]
the original town council approving surplus of a 2017 Caterpillar mini
[22:17]
excavator and purchase of a 2026 Caterpillar mini excavator for the
[22:23]
water department. Yes, Mr. Hammond. Thank you, Mr. Mayor.
[22:25]
Now, unfortunately,
[22:28]
the
[22:30]
mini excavator which we acquired, we keep out said he
[22:36]
wrote in the essence of repair of parts exceeds
[22:41]
the value of the machine. Given that in our
[22:47]
replacement policy, we are recommending to move forward to purchase a
[22:53]
2026,
[22:55]
in accordance with state contract pricing, $58,000.
[22:59]
Our goal is to surplus the mini ex and still have some value for parts and
[23:04]
whatnot.
[23:06]
But given the importance of that machine, when we have to work in a tight spot,
[23:13]
it's very important for the water department to have the excavator.
[23:20]
Matt, then I motion that we approve of two or five...
[23:27]
How do I add that number in?
[23:28]
$58,406.60.
[23:32]
For the purchase of the used Caterpillar mini excavator?
[23:38]
Second.
[23:38]
That's a motion and a second. Any other discussion? Yes, sir.
[23:41]
And if I understand, it comes from the enterprise fund, not the general fund,
[23:44]
right?
[23:44]
Correct. This is enterprise fund.
[23:47]
We do have what I call rain day budget money.
[23:51]
This is just one of those unfortunate things. We had a couple this month.
[23:55]
I don't know why, but the next item on the agenda is another example.
[24:00]
But,
[24:02]
we'll put the surplus, whatever we get out of the surplus, will go back as
[24:08]
disbursements.
[24:09]
Any more direct questions?
[24:13]
That's a motion and a second. All in favor of that motion say aye.
[24:16]
Aye.
[24:16]
Opposed, no ayes, have it. Number three, then a quote from Professional Pump and
[24:20]
Well Incorporated for an effluent pump at the Jimmy Mixon Wastewater Treatment
[24:24]
Plant. Yes, sir. As you would begin, one of the pumps for the effluent pump
[24:29]
station has failed, and then it can probably be funded on
[24:35]
Cecil, but our understanding from our supplier is that pump, that particular pump
[24:41]
model, is no longer made. So in previous cases, what we've done is we've rebuilt
[24:46]
those pumps, but we can no longer get parts.
[24:49]
So unfortunately, we have to purchase a new pump.
[24:54]
That quote came in at $18,750.
[25:00]
I make a motion that we approve the pump purchase for $18,750.
[25:07]
I'll second that motion. Any other discussion?
[25:10]
58. What's the total?
[25:12]
$18,750.
[25:14]
Perfect. Okay. I'll show from the enterprise fund.
[25:17]
Enterprise fund.
[25:19]
Yes, sir.
[25:20]
I'm done.
[25:24]
When something goes down like that, how critical is it to the operation of the
[25:28]
facility?
[25:30]
That's our pumps that run the go to Newark.
[25:34]
So if one of them goes down-
[25:36]
And the other one goes out, I guess there's enough water out there
[25:38]
... There would be.
[25:40]
I guess I'll find some afterthought of this when you first sent us an email.
[25:44]
Right.
[25:45]
Do we need to be waiting on something like this sometime?
[25:47]
Or does that compromise your ability to deliver what needs to be delivered?
[25:53]
Oh, the water can still go. It's just the two pumps that does the re-
[25:56]
Or it takes longer to get it out there?
[25:58]
Yeah. But it'll still work. It just-
[26:02]
So it didn't shut you down entirely.
[26:04]
No, no. But from a redundancy standpoint, typically, if one has gone down,
[26:10]
we're usually able to pull it out, have it rewired, new
[26:15]
brushes, and so on, so forth. Unfortunately-
[26:19]
Of course they do
[26:19]
... it'll stop possibly longer.
[26:21]
All right. That's all.
[26:25]
All in favor of that motion say aye.
[26:26]
Aye.
[26:26]
Aye. Opposed, no ayes, have it. Administrator Gordon. Thank you, Mr. Mayor.
[26:32]
Quite interesting stats. A couple of new things that came up this week I wanted to
[26:38]
run by the board. The SMERC, that's our municipal insurance research
[26:43]
fund,
[26:45]
has a grant out there for cybersecurity.
[26:49]
And so we applied for that grant. What it means is,
[26:55]
SMERC will pay 100% of the cost of third party, in
[27:01]
this case BC3, come in, perform an audit, a cybersecurity audit,
[27:07]
and help us implement whatever we need to do to get up to speed.
[27:13]
So that's really a beautiful program. So I sent that off today.
[27:18]
I hope that we'll have some word on that soon.
[27:22]
The waterline grant application,
[27:25]
I did forward that information to the council, but effectively, Commerce came back,
[27:30]
said we have to perform a study, survey, if you will, an income-based survey.
[27:36]
We've had, that's up on Facebook. It's up on the town's website.
[27:41]
We encourage everyone who has experienced issues
[27:47]
perhaps with ground water in the past, we would ask
[27:53]
everyone to complete the survey. There's a QR code.
[27:57]
It'll take you at most 10 minutes of your day.
[28:01]
It would greatly help the town secure funding for this project.
[28:06]
Additionally, next Wednesday we'll be out going door to door doing the survey
[28:13]
with the cost, and hopefully we'll have everything wrapped up this week.
[28:17]
We'll have enough feedback to be able to go back to Commerce and say, "Yes,
[28:23]
we qualify for this grant."
[28:26]
Are we going to advertise that maybe on Facebook, see if we can get some people to
[28:30]
hit on it?
[28:31]
Yeah.
[28:31]
Okay.
[28:31]
It's out.
[28:32]
Perfect.
[28:33]
And we've gotten,
[28:35]
at least this morning, a couple hundred hits already.
[28:37]
Nice.
[28:38]
So, yeah. Seems to be working, and I know it's been a discussion topic
[28:44]
for some. But again, we should have enough responses
[28:50]
to meet the Commerce threshold. So-
[28:54]
Let me interrupt you one second.
[28:55]
You want to ride up on the other?
[28:56]
I'm just going to say that'd be something I honestly think we should share every
[28:59]
day-
[29:00]
Oh, yeah
[29:00]
... until we get the numbers that we need to get this grant-
[29:03]
Yeah
[29:03]
... and the responses on the survey.
[29:05]
Yeah. We will, for sure.
[29:10]
So that's good news. The federal appropriation's still pending.
[29:14]
I did not get any response yet from the RAM staff,
[29:20]
so I'll just keep trying on that.
[29:25]
The Quala building, long story short, they were supposed to be wrapped up this
[29:30]
week. They are
[29:32]
not. So what we have now are the remains of the main building,
[29:38]
and a metal warehouse, which is in the back of the building, which must be taken
[29:44]
down. A building official has given him 90 days to take everything down.
[29:50]
It really was my hope to have everything down in time for Gilbert Hill.
[29:54]
That's probably not going to happen, unfortunately.
[29:57]
But the demolition, to be clear, is required to have everything off that
[30:02]
foundation, the slab. So no junk vehicles, no piles of debris,
[30:09]
no structures, everything has to go. So we'll be close and we'll monitor that.
[30:17]
Next week we have our kickoff meeting for the USDA grant.
[30:21]
We finally got a green light, so we'll be signing contracts on the
[30:26]
10th. USDA will be here, hopefully to get
[30:33]
everything taken care of.
[30:35]
The latest drought update, I know everybody's been getting a lot of rain lately,
[30:40]
and that's a good thing. But DNR says we're still in a severe drought
[30:45]
status.
[30:47]
It has been suggested maybe we could get the splash pad going this weekend.
[30:54]
Okay, let's see what-
[30:55]
Special favor of that, we can get that turned on.
[30:58]
How much water do we actually use down there?
[31:01]
We do not have a meter there, so I actually don't know.
[31:04]
So the water that goes in is not recirculated through a pump system, it's all fresh
[31:09]
water coming in?
[31:09]
Yes.
[31:10]
I just hate to see us go through the entire season, and especially this weekend,
[31:17]
and not... If a motion is appropriate, Mr.
[31:22]
Mayor, I would make a motion that we
[31:25]
crank open the splash pad this weekend.
[31:27]
Second.
[31:28]
All right. That's a motion and a second. Any other discussion about the splash pad?
[31:34]
I want to vote on that motion, say aye.
[31:36]
Aye.
[31:36]
Opposed, the ayes have it.
[31:37]
And if we're going to do that, again, let's post it on Facebook with a picture of
[31:41]
the splash pad. Labor Day celebration.
[31:43]
We have the splash pad at least for a weekend, a long weekend.
[31:47]
Right. Yeah, we'll have it for sure.
[31:50]
Youth Council, so
[31:53]
the application deadline was the
[31:57]
31st. We unfortunately got applicants from four of
[32:03]
the five schools. We were hoping to get...
[32:05]
We still have not got any applicants from Jasper County High.
[32:10]
We do have five applicants.
[32:13]
We had a late applicant on the 31st.
[32:16]
But
[32:18]
looking at their applications, and I know some of these kids,
[32:24]
I think they're all going to be fantastic.
[32:26]
So I think what we'd like to do is see if we can't move forward with those five to
[32:31]
apply. And I think what we need to do next is figure out what the
[32:36]
bylaws of the youth council will be, what projects we'd like to get them
[32:42]
involved with,
[32:44]
figure out dates for the coming weeks so we can have our first inaugural meeting.
[32:50]
Yes, sir. I contacted Highway International, if I could attend their first youth
[32:56]
council. They've been doing this for a few years.
[32:57]
And just for comparison purposes to see how they operate during an actual
[33:03]
meeting, the subject matter and that type of thing. And Harris said that'd be fine.
[33:07]
So if anybody would like to go, I've got a date, I'll let you know.
[33:13]
Just send that to us please.
[33:15]
Yeah. But after that, I was really impressed with what some of these had written.
[33:23]
Some of the things that they wrote were, one wrote, "I would bring effective
[33:29]
collaboration and communication skills.
[33:32]
I practice integrity in everything I do, provide logical problem-solving
[33:38]
skills." Oh, that's Paul. So that's just one example of the type of things
[33:44]
this group will bring. So I'm really encouraged by this,
[33:50]
and I'm actually pretty voicing.
[33:51]
I haven't only, I'm discouraged. School system is not that disciplined yet.
[33:56]
Well, they're working on it.
[33:58]
Oh.
[33:58]
Yeah. I actually reached out to somebody out there. It's my neighbor.
[34:03]
She works out there. And so she got back with me today.
[34:07]
I think their biggest thing is transportation.
[34:09]
She said, "Well, you got transportation provided?" And I said that, "No, I didn't
[34:14]
think so." And they wanted to know if they couldn't make it, could we do a Zoom?
[34:19]
But I said, "I wouldn't think that would be possible." But she's working on it, so
[34:24]
they might be a little late, but they're working on it.
[34:28]
Do you mind if I could add more to that?
[34:30]
I remember,
[34:32]
believe it or not, as far back as it was when I was in high school, we did this.
[34:36]
Not only did we have council members, but we had department heads of each of the...
[34:42]
So somebody would be associated with planning, utilities,
[34:47]
police department, fire department, they kind of shadowed those folks, those
[34:55]
department heads. So I
[34:57]
guess what I'm saying is maybe not this year, but if it's successful and we have an
[35:03]
overabundance of applicants, maybe we can expand the program to do something like
[35:07]
that.
[35:09]
Based upon this program, hopefully we can have maybe a future summer
[35:15]
internship program,
[35:17]
so we can expose some of these students to actual workings in government.
[35:21]
So that was my hope. I don't think we're there yet.
[35:26]
Space is an issue, honestly. But yeah.
[35:32]
We were envisioning we could have
[35:35]
projects for these kids in various departments, and then we can give them some of
[35:41]
the everyday things that we have to go through and say, "Hey, how would you
[35:46]
handle this? How would you budget for this?" So on and so forth.
[35:51]
So
[35:53]
a lot of possibilities there.
[35:55]
Yeah.
[35:57]
It's going to be interesting. I think you're going to be trying to get that done.
[36:01]
Yeah, for sure.
[36:04]
Let's see. Ridgeland Elementary, yes, we did get the grant application in with
[36:09]
SHPO, for the, it's called a stabilization grant.
[36:14]
I want to thank Graham for your work on that.
[36:18]
I could not have done it, honestly, without your help.
[36:24]
I'm breaking more environments these days, so thank you.
[36:28]
Fox Chase, I know from email traffic,
[36:33]
that here's those last units that finally have been recorded. So that's good news.
[36:39]
Yeah, let me, I'll tell you that. When you say in here, you mentioned, "I
[36:45]
am," you say in here, and I quote, I think this is what you said in your email.
[36:49]
"I am told they have been recorded at the registered deeds office." With all the
[36:55]
time that we've put in this, I thought for sure you could verify that.
[37:00]
It's easily verifiable, as you know, we all know.
[37:05]
And, then when you sent me back
[37:08]
the first email, you sent a link that said, in effect, "Here, look for it
[37:14]
yourself."
[37:16]
I was kind of shocked by that. And to your credit, I'm very familiar.
[37:21]
I look at documents on the registered deeds office quite often.
[37:25]
I certainly don't need you to send me a link to the registered deeds office
[37:28]
website. I look up documents all the time, the assessor's office even more so.
[37:32]
But, and then on your second email, you sent us a copy of the document which had
[37:37]
the information to confirm that it has been in fact done.
[37:42]
But I just thought that was a better way to do things than to just leave it at,
[37:46]
quote, "I am told they have been recorded at the registered deeds office." Yes,
[37:52]
sir.
[37:52]
Thank you, sir.
[37:53]
Yes, sir.
[37:53]
All right.
[37:56]
Still the highway water sewer project bids came in, yes, actually on the 1st.
[38:02]
Now when we did this
[38:05]
a year ago, the takeoff on the project cost was about 8.3 million.
[38:12]
A lot of the grant money's dried up.
[38:14]
Contractors are getting hungry, so the low bid came in at 4.2 million, which is
[38:20]
amazing.
[38:22]
So JR Horton is reviewing. We're also reviewing
[38:28]
the bid, but we expect that to be in
[38:32]
hopefully by mid-October. So you're going to see that project
[38:38]
actually take off. So that's good news.
[38:41]
Yes, sir. Is there anything else that's holding that up, or?
[38:44]
There is one last permit, but we got a note, actually an email yesterday from them
[38:50]
that it should be forward here next week or so.
[38:53]
And the deadline is? Isn't there a deadline?
[38:57]
Not really.
[38:58]
Anybody up against a-
[39:00]
No, there's no real hard deadlines here.
[39:03]
Obviously we want to get all permits in hand by October,
[39:09]
so I did say. So.
[39:12]
Let me know when you're finished, ma'am.
[39:13]
Can you give us an idea of what that will look like on that busy road as this
[39:18]
project progresses?
[39:22]
Obviously there could be lane closures at some point.
[39:26]
But again, that's all part of what's being planned because DHEC obviously
[39:31]
requires that you have a flagman
[39:36]
if you have lane closures. Some of it will be done after hours to avoid
[39:42]
morning commute, evening commute.
[39:45]
School commutes, yeah.
[39:46]
School commute, right. And a lot of it will actually, I've heard there'll be what
[39:52]
we call underground boring, so there won't be any overhead cut.
[39:56]
So a good example of that would be by the post office, everything will be
[40:01]
underneath.
[40:04]
Yes, sir. Thank you.
[40:05]
Yes, sir.
[40:07]
Let's see. I-95, we were up very late the other night.
[40:11]
But we got our design package for all the utility.
[40:15]
We had to get everything submitted, and we got it done at 11:45 on the 31st.
[40:21]
So
[40:23]
that package has been received, and that's certainly good news.
[40:28]
So, that was the deadline,
[40:31]
came down to the wire because we had some permitting issues.
[40:37]
But anyway, I think we got that resolved.
[40:41]
I've also opened discussions. We talked a lot about council chambers, technology,
[40:47]
audiovisual, a lot of improvements that need to be made.
[40:51]
VC3, which is probably one of the leading technology IT consultants
[40:57]
for municipalities in South Carolina.
[41:01]
Talked to them at municipal association meeting in Greenville, got their technical
[41:06]
team involved. They're going to send a technician out here
[41:12]
for next week. We'll do an inventory, and I hope to have a proposal in hand for
[41:18]
the council
[41:20]
certainly by October. So, we can get a lot of these technology improvements
[41:26]
done here. So the idea would be everybody would have their own console.
[41:30]
We'd have audiovisual, hopefully make some improvements to the sound system
[41:36]
and maybe even give us the opportunity to do our own building. Nothing against you.
[41:42]
Yeah.
[41:42]
But
[41:46]
I think that's the direction we probably need to go.
[41:48]
And I do think it's very important, and I've mentioned it before, with our lawyer
[41:53]
out of town, to have the ability to, in my opinion, we don't need to have him
[41:59]
here in person. But if we could have-
[42:02]
Yeah. Bring him right in on Microsoft Teams.
[42:06]
Teams.
[42:06]
And, yeah.
[42:08]
Yeah.
[42:09]
And I would like to take this out of the wall here and have two monitors on the
[42:14]
sides of the flag. So the public, who's there, who's watching at home, this is just
[42:19]
an awkward setup.
[42:20]
Absolutely, yeah. That's kind of the idea, actually.
[42:24]
So we'd probably have a more modern, higher definition television.
[42:30]
Yes, sir. I think we'll need to redesign this desk area.
[42:34]
And then for those of us that are vertically challenged, if you put a screen in
[42:37]
front of me, I don't get... They might see the top of my head, and like.
[42:42]
If May involves some changes here-
[42:46]
This would be right.
[42:48]
Yeah. That's a great point. So we'll have to see.
[42:52]
Obviously, we don't want screens blocking.
[42:55]
So we'll have to do that.
[42:59]
I've brought my laptop here before as well.
[43:02]
I think as long as you have a 14, 15-inch screen, you're fine.
[43:06]
As you're not asking for a 20-inch screen in front of you, so.
[43:10]
So, Commissioner. As I understand it, though,
[43:15]
that laptop will always be subject to a FOIA
[43:20]
request if Adam comes up, am I correct?
[43:24]
It is. Now, it's not going to be a laptop.
[43:26]
Yeah, I'm not asking for a laptop. I'm just saying size-wise, a monitor of that
[43:29]
size.
[43:31]
Okay. So
[43:33]
actually what we'll be doing is moving to an electronic
[43:38]
packet, which you'll have on your screen. You can take notes, et cetera.
[43:43]
If you want to bring hard copies, you certainly can.
[43:46]
But I think that's the direction we'll probably be going, and then we'd be able to
[43:51]
put,
[43:53]
for example, all the council packet materials up on the screen as well, so
[43:59]
all along. So that's really the direction I can tell.
[44:05]
And that's all I have.
[44:06]
Yes, sir. We'll move to Councilman Perkins.
[44:10]
So the River Health Festival's in less than a month, or a month.
[44:14]
I just want to make sure that we're getting everything ready around town.
[44:18]
We're
[44:20]
street sweeping. We've got flags up. We're wiping things down.
[44:24]
We're cleaning things up. Everything is as pretty as it can be for the town of
[44:28]
Ridgeland because we have many visitors, and that's been a source of contention for
[44:32]
citizens in the past. So I just want to make sure that it's all hands on deck to
[44:37]
help not only the committee, I know that they have a great loyal committee that
[44:41]
helps with the festival, but the town should be willing in any way possible to help
[44:46]
with facilitating this festival. It's just a great opportunity for our community.
[44:50]
A lot of history. I just want to make sure that the festival committee feels very
[44:55]
supported by the town, and that we do our best to put our best foot forward.
[45:00]
That's all.
[45:00]
That's all.
[45:01]
Nothing to add, Mayor.
[45:03]
Probably no support on those things, Patricia. When's that coming up?
[45:07]
Yeah. They are running behind schedule.
[45:11]
We talked first week of September, and obviously that hasn't happened.
[45:16]
So I'll be reaching out to them tomorrow to kind of see where they are.
[45:21]
Yeah. That gets a bit hard getting those comments from them.
[45:24]
Yeah, we need to get those comments as clean-
[45:26]
Regardless.
[45:27]
Yeah, exactly. So, once that's done, we can really get into some of the other
[45:32]
things.
[45:35]
Mayor, on the Brown v. Board thing, it's been something I've been hounding you
[45:40]
about. And I am excited about what you're doing now to kind of facilitate
[45:46]
moving that issue forward. Like I said, it's hard for us to embrace growth when
[45:52]
we got old infrastructure that we're not taking care of or haven't been able to
[45:56]
afford to take care of for a variety of reasons. I'm glad we're doing that.
[46:01]
In addition to the Facebook thing, I'm just trying to think of different ways we
[46:05]
can get the word out. And I
[46:09]
see the
[46:11]
kids flyer tacked on the side of a light pole with a
[46:17]
tag on it, with a phone number at MoMart. I mow your grass.
[46:22]
Can we print something like that and maybe put them at Eat n' Sweep and Sheffield
[46:27]
and places that some people... I'll do it. You said we had a QR code.
[46:33]
It'll
[46:35]
make it easy for them to get to the website, I guess, is what I'm talking about,
[46:39]
leave on paper for everybody.
[46:40]
Yeah.
[46:41]
Right. Yes. We've got it up on Facebook right now.
[46:47]
Our goal is also to move to some other platforms as well, supplement Facebook.
[46:53]
I just don't have enough hours in the moment, but-
[46:58]
When is the deadline?
[47:00]
We would really like to get this wrapped up within the next two weeks.
[47:07]
Let me interrupt you one second.
[47:08]
Just making a proposal as well. Something that maybe, with all this
[47:14]
revitalization and all, and then the circumstance that you're portraying right now
[47:18]
about trying to get the word out, why don't we look into getting some type of
[47:22]
digital billboard for the town? Maybe have it out front here on Town Hall, or have
[47:27]
it in a designated area, and let's try to look to build something like that.
[47:32]
That way, we can post stuff like tonight.
[47:34]
If we wanted to get the word out right now, we could blast it onto our own
[47:39]
billboard, essentially.
[47:42]
Events and stuff, just like Gopher Hill, just got to keep the town reminded, hey.
[47:48]
There's so much we could utilize that for.
[47:51]
But I know this is not going to resolve right now in this moment, but I think we
[47:54]
could look towards that.
[47:57]
But anyway, to have something printed, if that's the way you'd fly it, that we
[48:00]
could put a poster somewhere with something like that.
[48:02]
It's simple, and it may get, what if we got 10, 15 more responses?
[48:07]
That's 10 or 15 more that we didn't have, so I just want to make it easy for people
[48:11]
to find it.
[48:13]
Sure.
[48:14]
And I've seen the apathy around here.
[48:16]
I just don't want people to assume because the town's attention to tackle the
[48:20]
problem that it's going to resolve itself just because we're talking about it.
[48:23]
It's not.
[48:25]
Right.
[48:25]
Yeah. We've got to get serious about the implementation of this
[48:31]
stuff.
[48:31]
Right.
[48:31]
Yes, sir.
[48:32]
We have an executive session matter to take up on discussion and negotiations
[48:38]
incident to proposed contractual arrangements, discussions of a proposed sale of
[48:42]
parts of property, receipt of legal advice, settlement of legal claims, or
[48:45]
discussion of the public agency's position in adversary situations, discussions
[48:50]
about development of security personnel or devices, and that's per South Carolina
[48:55]
Code of Law Section 30-4-70. And the specific matter to be discussed is the
[49:01]
Moultrie Track, and I'll make a motion we go into executive session for that
[49:04]
reason. All in favor of that motion say aye.
[49:06]
Aye.
[49:07]
Opposed, no. Those have it.