Good morning, everyone. We are going to call this meeting to order. Can we start with roll call, please.
[0:14]
Director Jimenez, Director. Director Mirdina.
[0:20]
President. Director Rack. Here. Vice Chair Romero.
[0:28]
President. Chair Salazar. Here. We have quorum. Thank you. Right, our second item is
[0:34]
the public comments that are not agendas. Do we have any public comments this
[0:39]
morning? We do not have any public comments. Wonderful. Moving right along. Our third
[0:45]
Item is approval of the consent agenda.
[0:48]
We have eight items under consent, any public comment on this one.
[0:56]
There are no public comments.
[0:57]
No public comments.
[0:58]
In that case, I will entertain a motion to approve.
[1:00]
Move to approve consent.
[1:01]
Second.
[1:02]
Second.
[1:05]
All in favor.
[1:06]
Say aye.
[1:06]
Aye.
[1:08]
And you're posed.
[1:10]
I think that was unanimous.
[1:11]
Thank you.
[1:13]
So that will take us to a regular agenda.
[1:16]
Item 4.1 is acceptance of the annual financial report for the fiscal year.
[1:22]
And I believe any two will be presenting this morning.
[1:41]
Good morning, Board of Directors, staff, members of the public.
[1:46]
My name is Annie too. I'm the Director of Accounting.
[1:51]
I'm pleased to be here today with my team.
[1:53]
There are all in the back there, Kyle, our county manager, who has been instrumental in preparing the audit, and I'm very pleased to be here today to report that the audit has been completed successfully, is we have received an unqualified opinion, which is a clean opinion, and I want to thank the auditors, who is also here today.
[2:20]
from I Bayley, CPA, Mr. Amat Garabalee.
[2:27]
So just a little bit background about the audits.
[2:30]
They perform in accordance with generally
[2:33]
accepted auditing standards in the U.S.
[2:37]
I'm pleased to let you know
[2:40]
that the revenue has been increasing,
[2:43]
which is good news for ELJPA.
[2:46]
And after you have reviewed the packet
[2:49]
in the agenda. There's going to be discussion. So if you have any questions, I'm here to answer
[2:59]
them. And I would like to turn the presentation over to Mr. Amat Garabe. Thank you.
[3:11]
Good morning. This is the annual financial report for the San Mateo County Express
[3:17]
planes, joint powers authority,
[3:22]
the scope of the audit, and so I had mentioned a couple
[3:26]
of being ex-beforeers to ensure that these financial statements are fairly stated.
[3:32]
Again, as I mentioned before, it's a process of confirmation.
[3:35]
This one is a little different because the toll revenues are somehow increasing year after
[3:44]
So, we actually performed additional audit procedures with respect to the amounts that are reported on these financial statements.
[3:51]
These financial statements are comparative, so you can see your progress this year versus last year.
[3:59]
And again, it's ensuring that these financial statements are fairly steady, so we confirm this is what we do.
[4:04]
The most significant revenue in there is the toll revenues, which we confirm with Bata.
[4:09]
And various analytic procedures, your cash is confirmed, your various amounts are reported on the financial statements are also tested.
[4:22]
We do the other, this is the third subset that we do here. We split the other into a random final and then the reporting phase.
[4:30]
And this entity had grown in size versus the prior years.
[4:36]
I think this year, there are like $35 million in tolerating.
[4:41]
And I say this year, that's the 2025 fiscal year.
[4:46]
And this is it.
[4:47]
And so that will be more than happy to take any questions.
[4:53]
Thank you. Do you have any questions?
[4:55]
That's the other turn.
[4:57]
Okay.
[4:58]
Let's have one you.
[5:00]
It seemed as if you conditioned your statements by saying that because the revenue has been growing consistently every year,
[5:08]
you did you take a deeper dive in? Can you explain why?
[5:13]
Well, this authority has what they call call receivables, and that is a significant estimate.
[5:21]
And so you collect it in cash, but you do want to reflect on the financial statements, the
[5:27]
amounts of the tools where the vehicles actually were in the toll lanes, you want to line
[5:34]
it up.
[5:35]
And that's a accounting requirement.
[5:38]
And so estimates were not easily available in the prior years, but now I think we have
[5:46]
and fall at full capacity for a couple of years now.
[5:50]
So it's a little more easier to get those estimates
[5:53]
into the financial statements.
[5:55]
And that we actually spent quite a bit at some time
[5:57]
this year on just making sure that this 35 million
[5:59]
that you see in the financial statements are for vehicles
[6:02]
that we're using the lanes in fiscal year 25.
[6:06]
Okay, so it's just required more diligence
[6:08]
on your part.
[6:09]
Yes, thank you.
[6:13]
Seeing no more questions.
[6:14]
Thank you for that presentation.
[6:15]
Thank you.
[6:16]
And we'll need an action to accept the report, I'll move the acceptance.
[6:24]
Thank you, Director Romero, we have a second. I'll second. Second from red. Thank you. All in favor say aye aye aye any opposed. I think I heard a unanimous vote on that. So thank you.
[6:37]
Thank you. All right. That'll take us to our second item review and approval of the 2026 calendar of SMCELJPA.
[6:46]
board of directors, meetings, and receive an update on board meetings, statistics, and
[6:53]
we have gamecomstock. Thank you.
[6:55]
Hello, board of directors. First, I'd like to just take a moment to introduce myself.
[7:00]
My name is Kim Comstock. I am your new program director for the Express lanes. I've spent
[7:05]
the last 20 years working in mobility focusing on transportation demand management initiatives
[7:11]
in San Mateo County specifically and working mainly with commute.org and I look forward
[7:17]
to bringing my experience and helping with the success of the express lanes, but I do want
[7:24]
to say a quick note and thank you.
[7:27]
It's been about six weeks that I've been on board but CKAC staff, TAS staff, outgoing contractor
[7:32]
H&TB and as well as STB have been very, very helpful and have provided me with the warm
[7:38]
welcome and also providing me with a lot of information to get up to speed on this program.
[7:43]
So thank you everybody.
[7:46]
And now on to the staff report, so each year you review what your calendar is going to
[7:50]
look like for next year for the Board of Directors, but this year it was requested for staff
[7:56]
to look at what has been the trends over the last since you've been meeting.
[8:01]
To see if there's any quorum trends or issues and looking at all of the meetings that you have
[8:06]
You've been very successful in reaching a quorum.
[8:09]
There's been a few minor times that the meetings could not reach a quorum.
[8:13]
And it doesn't seem like there's anything that
[8:16]
to bring to light that there's any issues.
[8:19]
But we've provided you with some statistics on in your staff report to review and to ask us any questions about that.
[8:26]
But looking ahead for next year,
[8:29]
staff is proposing to continue with the first Friday of every month at 9 a.m.
[8:34]
to continue with that time slot. There is some proposed dates that are put into the staff report.
[8:42]
There's a few months where it conflicts with holidays such as January and July that we are
[8:48]
suggesting that potentially we do not plan for meetings during those months. But one month in
[8:54]
particular that's a very important month that we feel that might have some conflicts that we foresee
[8:59]
is the month of June. It's graduation season and it seems like that might be a good opportunity just
[9:04]
to reflect on what day we might like to choose
[9:08]
or what the report's preferences.
[9:10]
Staff has looked at the calendar and looked at availability
[9:13]
of what we know so far and we made a suggestion
[9:16]
of an alternative date of June 15th, 9 a.m. as well.
[9:23]
And so this is up for the Board to review
[9:25]
and to let us know if you have questions
[9:26]
on the proposed calendar and if there's any changes
[9:29]
or questions you may have, let's take them.
[9:33]
Thank you and welcome.
[9:34]
Thank you.
[9:36]
Are there any questions on the proposed schedule?
[9:40]
Future.
[9:42]
So this is proposed.
[9:45]
If it's adopted, it doesn't mean we have to have it.
[9:49]
If there's not sufficient business, correct?
[9:52]
Yes, thank you for that clarification.
[9:54]
So the staff is proposing to hold the monthly time on your calendars.
[9:59]
and if
[10:00]
If there's no actions that need to be taken, we would cancel the meeting in advance with advance notice.
[10:06]
Through the chair, a little bit of context on that we absolutely must have the May and June meetings.
[10:12]
It's not about which ones we, but let's say, for example, was going to be a 45-minute meeting.
[10:18]
Is there anything that is a critical nature that can't be held off to another meeting?
[10:21]
My belief is that time matters and for staff and for others
[10:28]
To me, I don't want to meet just to meet. I mean, I love seeing everyone and I love that there's coffee here
[10:35]
Yeah, sure
[10:36]
So, but I think you know anyway, get to just
[10:41]
Yes
[10:41]
Okay, thank you
[10:43]
So, these dates work for me. I'm the April 3rd date. I was hoping to be out of town, but I doesn't mean that I can't
[10:51]
We're apparently some good.
[10:54]
Anything else works?
[10:56]
Any other concerns?
[10:58]
Questions?
[11:00]
I think the time in general works better, for me on Fridays and my schedule is so up in the
[11:06]
Auret travel that I mean, I could not tell you what I'm doing sometimes next week, so.
[11:11]
I think having a planned out like this is for me and flexibility is good.
[11:16]
I guess one question I would ask is as part of this we've talked about kind of adjusting the
[11:20]
So I think that would be another thing that, you know, I think we can do ahead of time, so they're not relying on five of us to be here all the time.
[11:27]
I think that would be helpful.
[11:29]
Thank you, Director.
[11:31]
And that question did come up and it sounds like we haven't really had too much of an issue with the quorum,
[11:37]
but I know some of them have been real nail biders where we're really kind of wrangle everybody to make sure that we're here.
[11:43]
And so I don't know what the thinking was when we established the bylaws that require the number.
[11:53]
But if it is something that could be relaxed and we could take back to the other bodies,
[11:58]
I think there was interest in looking at that potentially.
[12:03]
And there could be exceptions for very high visibility important items.
[12:07]
but I think we still want to look at some options there so that we can continue doing the regular
[12:15]
business without that concern where somebody might be traveling, somebody gets sick at the last
[12:20]
minute, and then we were not able to conduct business. We can return in February with an information
[12:26]
item to talk about some of the options. Okay, thank you. Okay, so this item also requires action,
[12:35]
So there's no further questions.
[12:37]
I'll take a motion to accept this.
[12:39]
I moved to accept the calendar.
[12:40]
Thank you.
[12:42]
We have a motion in a second.
[12:43]
All in favor.
[12:45]
I, yes, that was unanimous as well.
[12:48]
Thank you very much.
[12:50]
All right, so we'll move on to our third item,
[12:52]
which is to receive a presentation on the draft 2025
[12:56]
congestion management program and the results
[12:58]
of the U.S. 101 express lanes, treble time runs.
[13:02]
And you have Eva Gay to present for that.
[13:05]
Good morning, chair Salazar.
[13:06]
Members of the J.P. Board, Eva Gay, CKag staff.
[13:10]
And today I will be presenting on the final C-25 CMP.
[13:16]
And primarily focus on the travel times on the US 101 Express Lines.
[13:24]
What is the congestion management program?
[13:27]
The C-Cag as a congestion management agency for San Mateo County is required to
[13:32]
develop and update the CMP, the CMP identify strategies to respond to future transportation needs,
[13:41]
develop procedures to alleviate and reduce congestion on the roadway network, and promote countywide
[13:48]
solutions. SeekHag is required to monitor the roadways operating conditions, which is measured by
[13:55]
the level of service metric. The LOS of a roadway is designated by a letter grade ranging from
[14:01]
A2F with LOSA representing free flow conditions with little to no delays and LOSF representing
[14:10]
force flow with excessive delays.
[14:12]
The CMP is updated every two years to assess whether the roadway segment needs its
[14:17]
operating conditions.
[14:22]
For the 2025 update, we monitored four performance metrics.
[14:26]
We looked at the level of service for 53 CMP segments and 16 CMP intersections.
[14:34]
This also included 10 companion segments and 38 companion network intersections that's monitored for information purposes only.
[15:00]
This includes the General Purpose Lanes, the Express Lanes, Cal Train and Sam Trams EPX. We also assessed
[15:08]
pedestrian and bicycle counts and looked at transit ridership for bark, Cal Train and Sam Trams.
[15:18]
In terms of the data collection, we utilize indirect data, which aggregates traffic from GPS enable
[15:29]
vehicles to determine average speed for freeways and multi-lane highways.
[15:35]
We also conducted floating car surveys on the general purpose lane as well as the express
[15:41]
lanes along US101 to assess the travel time.
[15:45]
We conducted a minimum of six runs that were completed during peak periods.
[15:50]
The route was divided into two segments with six runs' direction.
[15:55]
The data was collected during April, May, and August of 2025.
[16:05]
Our findings indicated that we have fewer failing segments in 2025,
[16:11]
a total of 12 before interregional trip exemptions were applied.
[16:16]
This in comparison to 2019, pre-pandemic data,
[16:21]
but slightly higher than 2023.
[16:23]
The variability in LOS reflects a shift in commuter patterns, with employees opting to work either remotely or leaving for work at later times.
[16:36]
For segments that were found with LOS standards that were below their threshold, the county travel demand model is used to determine the proportion of volume estimated to be from interregional travel.
[16:50]
If the segment is failing, still after volume reduction, a deficiency plan is required.
[17:01]
Now, in looking at the U.S. 101 travel times, we found that the express lanes trips are approximately
[17:07]
20 percent faster than GP lanes during peak periods.
[17:12]
This performance benefit can be further increase if violation rates are reduced when drivers
[17:18]
use the express lanes without properly meeting toll or occupancy requirements. It disrupts the
[17:24]
traffic flow and introduces unnecessary merging and enforcement related delays.
[17:31]
Just going over some key takeaways, the express lanes continues to provide reliable and
[17:37]
significant travel time savings for carpool, transit, and toll paying drivers.
[17:42]
greater benefits can be achieved with improved compliance and reduction and reduced
[17:48]
violation rates, transit riders and high occupancy vehicles, experience consistent and
[17:54]
dependable travel times. This supporting stability and encouraging a shift to shared
[18:00]
modes. Post pandemic travel patterns are evolving within office work increasing and
[18:07]
overall demand gradually rising and that concludes my presentation and I'm available for
[18:13]
any questions.
[18:14]
Thank you very much.
[18:16]
Any questions?
[18:21]
I think the performance seems consistent with my experience and that 20% bump seems to be realistic.
[18:29]
Thank you.
[18:31]
What does this data, if at all, and maybe I have a question about the segments?
[18:36]
but what of this data actually reflects on how the, you know, accompanying parallel lanes
[18:46]
are doing, or are we just analyzing the throughput on the manage lane to toll lane?
[18:54]
We are analyzing both the, in the 2025 update, we did the travel time runs on the GP lane
[19:01]
as well, so we wanted to assess how long you would take you from one point of the roadway
[19:07]
to the end of the roadway, whether you'd opt to take the general purpose lane, if you're
[19:13]
just taking general purpose lane or you're taking the express lanes and
[19:20]
so a question,
[19:22]
so a pre-imposed, you know, we didn't have manage lanes. I don't know, four years ago, how
[19:27]
long as it's. We had seven miles of an HOV, which we didn't have express lines. Correct. Correct.
[19:35]
Yeah. Yeah. Um, so in order, I mean, there's one thing is to look at the effectiveness
[19:40]
of throughput on this one lane, but then also is it impacting in one way or another, um, the other
[19:50]
lanes and over a span of time, right? As opposed to, yes, the traffic is moving this flow
[19:57]
this year.
[20:00]
This flow this year. One, have we done that analysis, and is it possible to do that analysis with this information? I don't know if we have like a post, a preset of data that we could then compare against what we have here. Now granted, we're coming out of the pandemic. There are all of these other conditions, but you might be able to isolate what the impact is.
[20:25]
I'm just, you know, yes, the lane is performing, but how is it impacting, you know, the
[20:31]
questions about GHG and vehicle miles traveled on those other lanes. So is there any way
[20:39]
of digging down into that data with some sort of analytical? We are looking at options to do that
[20:47]
as you noted, the conditions have changed considerably and we're not quite back to traffic levels
[20:53]
of 2019. We're getting close, but we're also seeing is that the peaks have shifted a little
[21:00]
bit or moderated, so the peaks have come down and the center is is busier, but we are looking
[21:05]
at ways to try to isolate those improvements. That being said, the time savings indicated in this
[21:14]
report are material for our residents and employees who drive into this county and the express
[21:21]
as noted in our quarterly reports is one of the most widely used county
[21:27]
transportation facilities with the sheer number of trips and people who utilize it.
[21:31]
But we are looking at ways to isolate that.
[21:33]
It is complicated due to the change in traffic patterns.
[21:40]
To follow up, if I could describe it.
[21:43]
On that point, so pre-pandemic data is available.
[21:48]
That would tell us both the volume and the average travel time.
[21:52]
were we tracking that before?
[21:58]
We should have some of that, but let us get back to you on that.
[22:02]
Yes. Because that's always been when the question comes up and has come up before,
[22:07]
is like, you know, what what data do we really have to compare to? And, and I think in order to really
[22:14]
make a draw a reasonable conclusion, we would have to know not only what the average time was,
[22:20]
But also that volume of cars, because if the volume has dramatically increased, then we would expect
[22:26]
the degradation and performance.
[22:30]
But if it's the same number of cars, then we can see, are they slower or faster?
[22:37]
But I always wondered, up to that point, what we're tracking, what's available, and what
[22:43]
do we compare to?
[22:44]
We have further complication that was mentioned is that we use in-rex data to determine travel time and you can set boundaries and say how long does it take to get from point A to point B
[22:56]
Which is really good information the challenge is that it includes all the lanes and includes the general purpose lanes in the express lanes. So it's one you can't really isolate the express lanes from that data and that is the
[23:10]
common statistic we use. That's one you can't isolate it. And two, it would
[23:17]
it would understate the savings, perhaps, because the time savings and the
[23:22]
express lanes are reflected as time savings on the whole of the facility.
[23:27]
I see. Okay. But we are looking into trying to figure out how to do that better
[23:32]
analysis to say, this is what we saw in post project and this is what we saw after
[23:37]
or they're just those complicating factors.
[23:39]
This CMP presentation is part of our bioannual analysis.
[23:44]
And this is the first year we've done timed runs
[23:47]
on both the express lane and the general purpose.
[23:50]
And the sample size is small, but over time,
[23:54]
that will really help.
[23:55]
And I know that's kind of unsatisfying,
[23:57]
but once we have a couple cycles of this,
[23:59]
we'll have a better ability to longitudinally
[24:02]
realize that or identify those savings in real life.
[24:07]
Just to add to Sean's point, the reason that we did the floating car survey was because in
[24:13]
Rex's data doesn't differentiate between the express lanes and the general purpose lanes.
[24:18]
So we did the travel time runs on the GP lanes as well.
[24:21]
Right. Yeah. And it's great. They will have that data going forward.
[24:24]
So Dr. Ramara, sorry for the answer. No, that's fine. And those are, so there were six separate
[24:27]
times that you did the travel time runs? Is that is correct?
[24:31]
Yeah. Yeah. Sean, I think it is going to be
[24:36]
Um, important for us to try to dig deeper into this data, you know, people are going to ask us for it and, you know, is there a justification for expansion if there is, are we doing it just to increase the throughput of that one lane or are we doing it because it has other answer Larry benefits that, um, flow to other the entire county because of GHG or vehicle miles track.
[25:00]
Thank you to you to get there. I know we have a quant in our presence here, as the chair. And I think it would be helpful to get that. Thank you.
[25:11]
I had a question about the, so there were three samples of, you mentioned April May and August.
[25:20]
Is there a particular reason why those months were selected? And did they vary? Because thinking August, you know, it's a middle of the summer, right before school starts again.
[25:30]
perhaps. There's a lower volume and does that somehow? The months of April and May are typically
[25:36]
consistent with previous CMP updates. We typically choose dates where children are in school.
[25:44]
We also exclude holidays in the data collection. We had encountered just some challenges with the
[25:52]
data, so then we had to go out and redo our accounts in August. Through the chair,
[25:58]
We, these are real time counts, so we put tubes on streets and some vandals
[26:04]
vandalize the tubes. So we had to go back out and recount.
[26:09]
Otherwise, we always try to do a April and May to get that's oneitudinal
[26:14]
elimination of any seasonality of effects. When in
[26:19]
August, I'm sorry, through the chair, and did we do this count? Because most schools
[26:23]
are actually back mid August if her call was like early August okay so before school probably
[26:29]
was back confession okay okay all right thank you I don't see any other questions this was an
[26:36]
information line so thank you everybody okay that takes us down to item five reports starting with the
[26:45]
chair portions report and I don't have anything to report but I do want to congratulate the entire team
[26:52]
another successful year. I think there's a lot to celebrate. Thanks, do you seem to be going
[26:58]
in the right direction? So all the hard work by staff is appreciated. So thank you all for that.
[27:06]
Member communications. Do you have anything to report? Don't see any. So we'll move down to
[27:14]
Executive Council report. Just briefly, I'd like to thank the board and the staff for all their work.
[27:20]
And this last year, I think the audit results show that a lot of the heavy effort is actually
[27:27]
bearing fruit and the organization is in a good space and I hope everybody has a happy holiday
[27:34]
season.
[27:35]
Thank you.
[27:39]
I don't have anything to report except to wish everyone a happy holiday.
[27:43]
Thank you.
[27:46]
Okay, chair, you know, I'm not wanting to be the Cassandra here, but in a quarter does not make a year, but it does seem that in terms of revenue coming in, this last quarter is that correct.
[28:04]
It is lower than the year before, it seems like H-O-V-3 usage has gone up, something that we should just look at.
[28:18]
I also know that our operating cost is lower, but it does not cause for concern, but I think we should definitely keep an eye on it.
[28:27]
I don't know why it's going down.
[28:29]
So we can maybe in the future understand that.
[28:32]
We'll continue to track that we are looking at ways that other regions are approaching enforcement, as well, to try to capture if there are indeed people making the, well, we know there are people making trips with an improperly labeled H of the tag as well.
[28:50]
But we don't know if that's the reason for the, for the change in revenue. So we'll continue to monitor it on a quarter quarter basis.
[28:56]
Yeah, and so the gross usage just has gone down also, so, you know, it's a tad, that it's not, I would, I don't think it's 10%, right, but I, I've waited, been steadily increasing and then now it's just something for us to look at.
[29:15]
I think I saw a note somewhere in one of the reports that said that there was a change in the classification of the finds versus actual sales.
[29:30]
And so that may have had some impact.
[29:39]
Through the chair, Kaki Chang, WD Director for CKS, supporting the JPA.
[29:43]
And I think that's the change in the financial and the accounting mechanism that was talked
[29:48]
about because before I think maybe the finance team could be a better first than I am.
[29:56]
But my understanding is that we were assuming all the toll revenue.
[30:00]
Violation will be coming in, but they don't always come in when we send out a collection notice.
[30:06]
So we've changed the county method to say, hey, when we actually have the money in hand, then we book.
[30:13]
So I think that was on the day.
[30:14]
Okay. It's a timing issue then.
[30:16]
Yeah. Thank you.
[30:20]
Okay.
[30:22]
We will move on to item 5D, which is the policy program manager's report.
[30:27]
So hello again, directors, I'm just going to give a brief update because I've got great news that the GoCard program has officially been launched on November 17th.
[30:42]
This program as a refresher is the new $200 mobility debit card, which can be used on any mobility service in Cemeteria County.
[30:52]
And this program is for San Mateo County residents that are income qualified.
[30:58]
This program right now we're onboarding all of the CBOs and making sure that they're
[31:04]
comfortable with the process, the new technology and I'm happy to report that it's been
[31:09]
going successful.
[31:11]
The new portal, the new tool, the training materials are all working and the CBOs are starting
[31:16]
to process the applications.
[31:18]
We're considering this a little bit of a soft launch at the moment so make sure all the
[31:22]
reviews are comfortable and have what they need to start processing and if there's any questions
[31:27]
we're addressing them.
[31:29]
So we look forward to coming back to you in an export meeting to give you information on
[31:34]
how successful it was and some numbers and some information for you to understand the success
[31:38]
of it as well as any type of marketing or efforts that you can make on your part to get the
[31:44]
word out.
[31:44]
But right now it is available.
[31:46]
The website is updated and the CVOs are getting used to the new process and are very
[31:51]
excited and there's a lot of interest. With that, I would love to give Liz from STV just a moment
[31:57]
of to, I'll say a few comments.
[32:01]
Can I ask a quick question about the program quickly? I've had a couple people ask what the
[32:08]
documentation required to get the go card to qualify for the income, specifically non-non-US citizens.
[32:16]
Well, that each case manager can determine what documentation they have. So if they have
[32:21]
anything that can prove their income, they will be willing to look at it. And if there is a
[32:27]
hardship in proving that the case manager can make the call and approve. And because there's a
[32:35]
self-attest form that they can say that I attest to making this income, and the case manager can
[32:40]
approve them.
[32:45]
Good morning. Your Salazar and members of the board and staff. I'm LeCessison.
[32:49]
I'm the project manager for the program management team. So we're about a few months into the new
[32:53]
program management contract, and I want to start by thinking the H&TV team for a very smooth
[32:58]
transition, and thinking the staff and the board for a very warm welcome.
[33:03]
Since taking over this role, our team is assumed day-to-day operations of the express lanes,
[33:07]
that includes managing customer escalations, monitoring corridor performance, and preparing
[33:12]
the weekly operations reports.
[33:15]
Another example is today's quarterly performance report that was on consent that is one
[33:20]
of the key deliverables we're producing.
[33:23]
Looking ahead, we're beginning to refresh some of the tools and methods used to evaluate operations.
[33:28]
The goal is to separate diagnostics of what's happening in the lanes and clear visibility into performance trends.
[33:35]
You will start to see improved graphics, better data visualizations, and new ways of presenting system health and congestion patterns.
[33:43]
We welcome any feedback and what helps you most in these quarterly updates.
[33:48]
Regarding the equity program in the background, we've been preparing to take full responsibility
[33:52]
for ongoing program administration, that includes coronations with the CBO partners,
[33:57]
Beam, and all the stakeholders.
[34:00]
Finally, deeper involvement in daily operations is giving us important insights into emerging
[34:04]
issues such as the recent media story about high toll prices and certain segments.
[34:10]
With more precise operational data and hand, we can better respond to public concerns and
[34:15]
maintain confidence in how the express lanes are being managed.
[34:18]
Thank you again for your support in this transition and I'd be happy to answer any questions.
[34:23]
Thank you.
[34:24]
It's nice to meet you.
[34:26]
Any questions?
[34:28]
All right.
[34:29]
Thank you very much.
[34:32]
Okay.
[34:33]
That's it for reports.
[34:35]
We have no written communications this month and our next meeting will be in February.
[34:41]
So I also want to wish everyone a very happy holiday season.
[34:45]
and we'll see you all next year.
[34:48]
Very soon.