[0:06]
Okay, good evening, everyone. It's Monday, July 13th, 2026. It is 707 p.m. and I'd like to call to order the city of
[0:16]
Shorwood City Council regular meeting. Please rise for the pledge of allegiance.
[0:40]
And agenda has been presented to our council. It's been posted online. A copy can be found here in city hall by scanning the QR code.
[0:49]
Council are there any additions or corrections to tonight's agenda and if I don't have any
[0:53]
do I have a motion? I move to approve the agenda. I have a motion by Council Member
[0:59]
Sanchigrin and a second by D. Gritolo all in favor. I opposed motion carries the
[1:06]
agenda is hereby approved unanimously and just for the record our recording secretary will
[1:12]
make note of Council's attendance for the record. Going on to agenda item number two consent
[1:18]
agenda. The consent agenda is a series of actions that are being considered for adoption this evening
[1:24]
under a single motion. We have consent agenda items 2A through 2G. Council, are there any questions
[1:32]
relating to these items or do I have a motion? Okay, a quick question on item G. Okay. And the way
[1:40]
the memo is written. This is staff will measure completed cracks as the contractors performing
[1:46]
the work and direct the contractor to stop once they have reached the contracted amount.
[1:51]
So, I just wanted to understand a little bit more about how that decision is made and what
[1:56]
is there a risk that we're going to be missing roads that need cracks filled?
[2:00]
Does this create that kind of risk for us?
[2:03]
Well, we're doing the roads in priority of ranking by public works.
[2:11]
So they rank the ones we want to do, and to avoid the risk of a change order, they're doing it this way.
[2:18]
Kind of based off of our previous discussions we've had over the year.
[2:24]
This will get them to a point of its addressing the worst streets first.
[2:29]
And they got a pretty favorable bid and pretty good pricing of the three contractors.
[2:35]
But that's kind of where we drew the line for this year.
[2:41]
So there's a little bit of ambiguity that in terms of like how much they're going to do based on is it time
[2:47]
What drives the cost is it?
[2:50]
Learning linear foot of crack. Okay, so that's why we're measuring every linear foot
[2:55]
That's how we price that or that's how the contractors bid it how many linear feet do we get for $47,000?
[3:04]
A little
[3:21]
bit of quicker 60,000 linear feet.
[3:25]
I mean, streets do we think we can do with that?
[3:28]
I mean, I don't know.
[3:29]
Is that a lot of streets or not?
[3:31]
That is probably about 10 to 15 streets.
[3:35]
We had, I think, 25 to 30 ranked in priority
[3:39]
as worse to best.
[3:44]
And so we think about half of them.
[3:46]
We'll get done.
[3:47]
Thanks.
[3:48]
I have a question about if we're done with this.
[3:55]
I just have a question on the claims list.
[3:57]
Two questions on the claims list.
[4:00]
Two D.
[4:02]
So my first question is, if I'm reading this right,
[4:07]
we have a $1,300 IRS charge for a federal payroll tax deposit
[4:12]
that was made 12 days late and also a late fee to excel
[4:17]
for 12642. I know Ms. Schmuck is not here, so I don't know if you can answer that, Mark,
[4:26]
or Mr. DeVensky, or if we need to.
[4:29]
Yeah, I don't know that I can answer specifically some details, but part of our process,
[4:35]
we caught some things that were missed, and so unfortunately there were some fees that we've
[4:42]
incurred. One of the things that we are implementing to try to avoid this in the future is actually
[4:49]
using laser-fish for our accounts payable process now, so it's a kind of internal process
[4:57]
improvement.
[5:00]
And so rather than invoices being sent to an email, I mean they go to an email,
[5:05]
but then they go into a laser-fish process that goes to the right department head and things
[5:12]
everything gets routed and is tied to our financial software, so.
[5:20]
Thanks.
[5:22]
Yeah.
[5:22]
Council, are there any other questions relating to consent agenda items 2A through 2G?
[5:28]
Hearing none, do I have a motion?
[5:30]
I move to approve the consent agenda.
[5:32]
Okay.
[5:33]
I have a motion by Council Member Sangegrin, a second by DeGritolo.
[5:36]
All in favour?
[5:37]
Aye.
[5:38]
Opposed?
[5:39]
Motion carries unanimously, and the consent agenda is hereby approved.
[5:44]
We'll now move on to matters from the floor and as I stayed it earlier, our online viewers
[5:49]
where we've had a little trouble with the audio tonight.
[5:52]
So if you have a point from matters from the floor and we can't hear you, I encourage you
[5:57]
to send it in via email or drive up to City Hall and I'll let you in towards the end of
[6:03]
the meeting.
[6:03]
We'll revisit matters from the floor just for people like that, but we'll do our best
[6:09]
to try to hear you.
[6:10]
Is there anyone in our audience from matters from the floor?
[6:13]
Seeing no hands raised, is there any one in our online audience who would like to participate in matters from the floor?
[6:26]
Okay, and then seeing no hands raised, there will be no need to reopen matters from the floor at the end since no one viewing wants to speak.
[6:38]
Last chance, hands raised. I see none.
[6:41]
We'll move on then, agenda item four, general business, four A is a tour de tonka presentation.
[6:50]
Take our way, come on up to the podium, introduce yourself to us, tell us the organization you're with and give us your annual report.
[6:58]
Hi, well thank you for having me, Kim Carlson, and the executive director of Minotaka Community Education.
[7:02]
Also, a member of your community center test force with Barry and Mitch, so I'm excited to be here today, and it's been really a privilege to sit with the team and discuss other matters as well.
[7:15]
Here tonight to talk about tour to Tanka, it is a community education program within the school district, so many people think tour to Tanka is its own thing.
[7:24]
So we just want to put a shout out there that it's actually part of the
[7:30]
The Community Education Program. Next, you'll see all of our sponsors for tour de tonka. Is anybody unaware of what tour de tonka is on the councilor anyway? Okay. I think I've seen your faces before. So it's been around for 21 years now. This is the 21st year and every year we do get sponsors. So there's a great list of them there. We get everything from donated pizzas to boots on the ground, financial support, helps keep the cost down for participants.
[8:00]
also gives us a little more flexibility in offering the foods and snacks or music at the rest
[8:07]
staff, etc.
[8:08]
So we really appreciate our sponsorships.
[8:12]
Last year I just kind of recap for the 20th.
[8:15]
It was really about connecting communities that's kind of just of what we're looking at.
[8:21]
What we think about when we get tour to talk together, it's quite a rich, we have writers
[8:28]
from 22 states that were listed and then about 113 cities, so 94% of our ridership comes from
[8:36]
cities across Minnesota. It's very well known across the state and around. I just had a call
[8:42]
from some gentleman that has a bike shop. I can't remember which state, but he's like,
[8:47]
all my riders come in here and say they love to come, so it's a very well-run event that I can't say
[8:55]
had a whole lot to do with it because it had 20 years of experience before I stepped in, but it's
[9:01]
going very well.
[9:03]
We always survey our writers afterwards and one of the things that we're really proud of
[9:09]
is was this event well-organized and well-planned and we had 99.4% saying definitely.
[9:18]
Well-organized, loved the music and just that community building and that healthy activity.
[9:24]
So, and that's really what communication is, is here for.
[9:29]
In 2026, what's new, we are kind of excited.
[9:32]
We added some cheer zones for families.
[9:35]
So kind of choosing spaces that are safe, that it can be fun.
[9:38]
We have some activities there, whether it's building signs that, you know,
[9:42]
are encouraging riders along the way.
[9:45]
And then a post-dried family zone up at the high school as well,
[9:49]
just encouraging people to come up and have fun.
[9:51]
And we have an online apparel shop with exclusive merch, which you can go on now and check it
[9:57]
out.
[9:58]
And then this year a change, what's new is we have four routes this year.
[10:01]
We usually have five.
[10:03]
We have a 16, 24, 40, and 58 mileer.
[10:07]
We decided after much consideration meeting our safety partners and just the trajectory of
[10:13]
getting volunteers and staff workers that it just wasn't one that we could feel comfortable
[10:18]
in supporting.
[10:19]
So we don't have the 100 anymore, but we do have four really robust routes, and I think you'll see it on the next slide
[10:27]
There they are they haven't changed year over year
[10:30]
So there's few rest stops coming through we don't have any coming through here rest stops
[10:35]
but we do have the
[10:38]
24 40 and 58 all those writers come come through your area
[10:43]
So I imagine that'll be about 1,500 people coming through so
[10:49]
Again, we have bike mechanics there, all the safety partners are in place.
[10:54]
We have just a great relationship, which I'll talk about in a minute here too.
[10:58]
But we also give to the ICA Food Shelf every year, there's a dollar amount that goes back
[11:04]
into the Food Shelf.
[11:05]
So we're excited about being able to partner with them and make sure we give back to ICA.
[11:11]
And then the next slide is just our volunteers.
[11:14]
we have about, we still need about, not currently, but overall, 400 volunteers and it's filling up really nicely.
[11:22]
The people come out for this event. I think they really enjoy it and love to support it.
[11:26]
It's a really funny event. I was really, really overwhelmed the first year that I did it in standing up on that podium
[11:34]
and seeing the wave of riders come through and then just the community response to.
[11:39]
So we, the volunteers come.
[11:41]
So we're still looking for some.
[11:43]
There's a QR code there.
[11:44]
If you're interested, pack it, pick up.
[11:46]
You can be out on the route, because it'll
[11:48]
be a perfectly sunny day and no air quality alerts
[11:52]
like last year.
[11:54]
Looking for route captains, rest stop, workers, et cetera.
[11:58]
So give us the colleague community
[11:59]
at we can set you up with a spot,
[12:01]
still looking for a few volunteers yet.
[12:05]
And then as I said, our safety partners
[12:08]
have just been phenomenal, all the police fired departments and volunteers we have that it's very well recognized in our staff survey just appreciate that writers safety is priority
[12:21]
They felt safe with the police at the intersection so we work really closely to make sure this is a safe event and that was one of my big concerns first coming in that that's
[12:30]
2000 some writers that are out on those roads so we want to make sure everybody's safe and having fun so
[12:37]
Thank you to Lieutenant Michael O'Keefe and the South Lake PD also.
[12:43]
They've been a great support to us and again we all work closely just making sure because we all have that same goal in mind as safety.
[12:51]
So appreciate their support.
[12:53]
So hopefully we'll see you there.
[12:55]
If you're riding or just want to be a part of it, check out our two zones.
[13:00]
August 1st, it's coming in, coming up quick.
[13:02]
So if you have any questions, feel free out there
[13:05]
in the community to reach out to us.
[13:07]
And we hope to have around 2,000 writers
[13:11]
again this year.
[13:13]
So any questions for me?
[13:15]
Once all any questions, I know some of you
[13:16]
have done this race in the past.
[13:19]
Yeah, I haven't done the race in a couple of years ago.
[13:23]
It was so rainy.
[13:25]
Yeah, good.
[13:26]
And I felt like the rain cloud was following me.
[13:28]
I think it was following some people, yes.
[13:31]
I can even see that I've never been in rain that hard.
[13:34]
I was wondering how, you've had some bad luck in the five to 10 years or so, a lot of lightning,
[13:40]
off and on lightning.
[13:41]
We do work closely with the local weather folks in last year.
[13:45]
I got a call right at the couple hours before hand asked from, I think it was, I don't know if
[13:50]
it was WCCO or one of the papers saying what's my plan and the air quality alert was high.
[13:56]
So we work with very closely with them.
[13:59]
And our police sperm, too, has some direct connects
[14:01]
and kind of watching it.
[14:02]
But it's rain or shine.
[14:04]
But I was part of the infamous rerout.
[14:06]
Oh, yes.
[14:08]
Some people took an accidental rerout, too.
[14:11]
Or it went the wrong way out.
[14:12]
Attendance has been affected by some of the bad weather
[14:15]
lock.
[14:15]
Is it like an over the past 10 years as a decline?
[14:18]
Or is it stayed the same?
[14:18]
It's really stayed real steady.
[14:21]
I mean, now without the 100, we could see a dip,
[14:23]
but also we could see a rise in the lower routes.
[14:28]
I think it can be intimidating for people
[14:30]
on those lower routes to be out
[14:32]
and about with 100 miles, they're pretty serious.
[14:34]
And so we'll see, we'll see.
[14:37]
Yeah, I think 2,300 was last year,
[14:39]
but that was a high air quality alert.
[14:41]
So I think those folks that are in the lower ranges
[14:44]
weren't interested in going out
[14:46]
in the ones that have trained and kept going still came,
[14:49]
but there's a no refund policy.
[14:52]
It can people register the morning of.
[14:55]
You can register the morning of.
[14:57]
Yeah, we're taking registrations right up to the night before,
[14:59]
and then we turn.
[15:00]
It often in the morning will be there right in early. The races are the run. The ride starts at seven. The first riders go out at seven and then shortly after that. So should be a great event.
[15:13]
I just want to remind everyone if you're a shorewood resident, please register under the city of shorewood.
[15:20]
Don't register itself here. Don't register. That's where your mail comes from, but register under shorewood.
[15:26]
All right, we'll look for sure with this time.
[15:28]
Yeah, exactly.
[15:30]
All right, thanks for your time.
[15:31]
Yeah, thank you very much.
[15:34]
We'll now move on to General Business 4B,
[15:38]
Cathcart Park, Tennis Court resurfacing.
[15:41]
And for that, we have a memo in our packet.
[15:44]
And I'm going to turn that over to our Parks Director, Mitchell Check.
[15:50]
Thank you, Mayor and Council.
[15:52]
So, on the February 23rd, 2026 City Council meeting, the Council adopted our Parks Master Plan that included a capital improvement plan, that was developed to kind of prioritize investment within our parks system.
[16:06]
Part of that approved plan includes resurfacing of the Cathcart Park Tennis Court, along with the replacing a signage that has a budget of 18,000 dollars.
[16:15]
This item was first brought to the park commissioner in the May 19th meeting. Staff received
[16:20]
proposals or quotes from three different contractors and kind of got some mixed opinions
[16:25]
from contractors through the process. One contractor stayed to that. They were not recommended
[16:30]
to reserve sub-the court. They suggested a full replacement with the current condition. However,
[16:35]
the other two quotes they said that a research looks done the lifespan and quality of the
[16:40]
the court, however it will not be a perfect college grade court, there might still be some inconsistencies
[16:46]
on the court because there are underlying structural and drainage issues. So they did say a
[16:53]
resurface will buy us more time and pru-playability and be a quality investment, however we
[16:58]
will want to be unprepared for a full reconstruction at some point in the next seven to ten years.
[17:04]
So with this information, the commission kind of expressed a little bit of pause and wanted to go
[17:09]
and physically examine the courts themselves before making
[17:12]
a recommendation on how to proceed and it worked out that our
[17:16]
June meeting was park tours and we had cath-cath-cath-cath
[17:19]
park slated to visit. So the park tours, we looked at the
[17:23]
court, examined kind of some of them more critical areas. There's a
[17:28]
couple of spots where it looks like there's some nearby tree
[17:30]
roots that have caused some slight heaving on the court. However,
[17:34]
the positive thing is that's not those aren't in the main
[17:37]
playing area, they're kind of on the outskirts of the court and we kind of explain what the
[17:44]
resurfacing project would look like. It is noted that the existing cracks will likely
[17:50]
reappear his hairline cracks over time and then they say in the next likely five to seven years
[17:57]
those cracks will basically return to what they look like currently.
[18:02]
The commission decides to remove
[18:04]
the proposal from CNH Sports Services from consideration because it did not include any patching
[18:10]
of low areas on that currently hold water while the other two quotes do. We also received
[18:17]
a fourth quote from Tennis West that was received late. However, it was still included for consideration.
[18:23]
So following the onsite assessment, the commissioner has agreed that resurfacing would extend
[18:29]
the quality of the life of the court and it's a valuable amounting to that is used by the community.
[18:34]
We actually had a neighbor that saw us out on the court when we were examining and came over to see what we're doing and expressed some concerns
[18:41]
They said they love to play about some of the cracks in grass and stuff has been a concern for them
[18:45]
So they're happy to see that the commission was taken a look at it on the commission made a motion to recommend approval of the quote from
[18:53]
ATE recreation in the amount of 15,894 dollars and 60 cents on that past unanimously
[19:00]
unanimously for to zero. And if approved, the project would be scheduled for completion late August
[19:06]
in early September. That is the lowest quote when removing the CNH Fort surfaces,
[19:12]
that did not include the patching of low areas. And the commission also noted that they did
[19:17]
do the courts that were going to talk a high school, which they have been on themselves and said
[19:22]
our quality courts. So we're happy that it's an experience in qualified contractor.
[19:27]
So, that brings us in $2,105 below the approved budget.
[19:33]
We will have to purchase and signage for that court as well.
[19:37]
However, that will be well under those remaining funds.
[19:42]
So, with that, I will open it up for any discussion.
[19:45]
Okay, thank you for your presentation.
[19:48]
And I'm really glad to see that in the proposal,
[19:51]
they're including striping different colored for pickable
[19:55]
courts as well. So, council, are there any questions?
[20:00]
Did I read somewhere where it says how long this is
[20:03]
supposed to last? Is it three years? A resurface is generally like
[20:07]
five to seven years, depending on court conditions and usage and all that,
[20:12]
and I'm gonna sort of winters. We have any idea how much it's used. I mean, I don't
[20:18]
have hard statistics but from one of here of the neighboring community it's used quite frequently
[20:24]
and like the neighbor that stopped over during tours said they would use it more if it was in better condition as well.
[20:31]
What would it cost to actually fix it properly and I because I wasn't sure you said what it cost to resurface it but I wasn't sure if that
[20:41]
was included in removing the roots because if we resurface it and we don't do that then it's going to do the same thing right.
[20:47]
Yep, so with a resurfaced, that's kind of what will happen if there's structural issues
[20:50]
those will return over time. It'll improve that short-term playability for a full court
[20:56]
reconstruction. You're looking likely around $80,000 dollars, you know, give or take, but
[21:03]
but with that removed the tree roots and everything and then we wouldn't ever, that would be put in all
[21:07]
on the last fault in and fix it correcting structural issues as well. Is this, is there a full
[21:13]
construction anywhere in the CIP, like maybe 2030, is that already in there?
[21:19]
It is not currently with, I think, the next council meeting we're reviewing CIP during
[21:24]
work session that's added in as a new, you guys, we'll be 2035, I believe, right?
[21:32]
2036? Something, whatever the end of that tenure CIP, we did added in there.
[21:37]
I was just wondering if there was a way we could figure out, you know, like we have this
[21:41]
much money for like park repairs. This park is used the most so we should you know put our
[21:47]
might like pool the money. I don't know like there's this this like theory that you just
[21:53]
you pick a priority target and you aim at that everything you have until you fix that target
[21:57]
and then you go to the next target and then whatever money you have left you keep you know you go
[22:01]
to that target. Like two geese point if this you know is used but not used as much as say another
[22:08]
court that could probably use, you know, this money to repair it, right? Because, or by first
[22:15]
that, right, there's some other thing that we have the extra $65,000 already program to fix
[22:22]
this thing, but it's not as used as this, then we could take that 65K out of to the 15K here and
[22:29]
actually do.
[22:30]
This properly. And we looked at that. Does that make sense? And what is what I am saying, making sense?
[22:38]
It makes sense. I think we went through last year of doing the master plan to kind of get a plan in place that identified kind of those priorities and stuff.
[22:47]
And this was outlined with that.
[22:50]
So we're kind of following that plan.
[22:54]
That's not what I'm asking.
[22:56]
So I'm asking like in the plan, right?
[22:58]
So is there something else that gets used less?
[23:01]
Like if this gets used a lot, like if everyone's using it every day,
[23:04]
it's very high usage, right?
[23:06]
But the other thing that's in the plan already
[23:09]
doesn't get used as much is there a way we could defer that
[23:14]
and use that money for this.
[23:17]
Because I'm concerned because people use it a lot,
[23:19]
I don't want it to be, I don't want to have to fix this again
[23:21]
in five years, rather pay the $80,000, get rid of the tree roots, do it properly, and in order
[23:28]
to find the $80,000 we have to have a trade-off, right?
[23:31]
So is there another project that we could push off and take that money and use it for this
[23:36]
instead?
[23:37]
In 2026, we would not have if we took all of our allocated CIP funds, we would not have
[23:42]
enough money to do a financial construction.
[23:46]
for 2026. That's what we're, I was just at, or 2027 because I mean, if they've been living
[23:53]
with the cracks for our five years, then maybe we, you know, we've pushed it to the next
[23:58]
year. I'm just trying to see if there's, you know, like, 2027. It's a freeman self playground
[24:04]
or freeman North playground, sorry. That is deemed as a highly used and necessary placement
[24:11]
as well.
[24:15]
And that's the only project for 2020-27.
[24:20]
But that's a huge project, right?
[24:23]
And some of the equipment in Freeman is deemed at its end of life.
[24:31]
And generally speaking, for tennis courts, you want to re-surface every year.
[24:37]
I mean, five to nine years depending on the condition and whatnot.
[24:41]
So, I think sometimes these courts have gotten a little out of that rotation which then causes
[24:47]
them to degrade faster, but the commission kind of said investing in this will provide
[24:56]
us more quality of life to then plan for the future funding for a full replacement while increasing
[25:01]
that playability.
[25:03]
But is it in the plan in five years to have the $80,000?
[25:07]
It's not currently in five years now.
[25:10]
Then this, this, this patching is, why are we doing this?
[25:14]
Because this patching is only in the last five, maybe seven years,
[25:17]
but probably what you're just saying about the trees and the cracks and the water
[25:20]
it will probably only last five years.
[25:22]
In five years we're going to have to spend another 15 to 20,000 dollars
[25:26]
just to resurface, which will last another five years.
[25:30]
So again, like my, my question is, is this the smartest use of our money
[25:35]
or the best way to do this.
[25:37]
We evaluate the CIP on your libases.
[25:40]
It was established from the master plan that was developed.
[25:43]
Think the way the commission's looking at is we will
[25:45]
with this, we will buy another five to seven years of quality
[25:48]
play people being able to utilize an amenity
[25:51]
and we can plan for that future investment
[25:53]
because those funds are not available at this time.
[25:57]
Are you planning to put that in the plan for five years?
[26:00]
Well, we review the CIP every year and kind of once you get outside
[26:04]
that five years those projects shift based on need. So if it's looking like in five years the
[26:13]
tennis quarters in need of a full replacement that likely would get moved up with something
[26:16]
else getting pushed out. Even if the master plan didn't have it that way it would still be moved
[26:21]
up because I mean what you're saying right now is this is what the master plan said we can't change
[26:25]
it we have to do this. I mean it's a council decision if you want to change it. I'm just saying
[26:30]
We went through the process to get this plan.
[26:33]
Generally speaking with a cat loan permit plan,
[26:35]
those first five years are a pretty accurate representation.
[26:38]
Outside of that is, I mean, not a gas,
[26:41]
but things that you want to be earmarking and planning for.
[26:45]
So those things up likely shift
[26:47]
as we move through as our park CIP has for many years.
[26:53]
Thank you.
[26:55]
Are there any other questions?
[27:01]
I think maybe the issue that part of the CIP as is when you're, I'm looking at the part
[27:09]
commission CIP, our part CIP, and there's 18K and tennis court resurfacing, and then
[27:18]
there really isn't
[27:23]
a full replacement cost in here, and I think with that context,
[27:31]
I think
[27:32]
Maybe we would have caught that different way of prioritizing these.
[27:39]
We would have seen, say, an 80k expense in fiscal year, 32 or something.
[27:46]
So maybe a part of this is a second look at what these are temporary fixes,
[27:52]
where these in within the 10-year plan,
[27:54]
where these more long-term fixes live.
[27:59]
I will say I have my family has played bickle all out there somewhat comically and it does
[28:08]
need some work, especially with the popularity we had tried to go to Badger and it was
[28:14]
too bad it was packed and people had my girls out there and they were going to be there
[28:18]
for a while.
[28:19]
And so we went over to Badger and it wasn't a great surface so I think it does need some attention
[28:25]
is it there?
[28:28]
Two point we've been through this and we looked at it, and we made a judgment call on it,
[28:32]
and I think it's a good temporary solution.
[28:38]
I guess what I'm also wondering is how, how, when was the last thing we did to Beth to
[28:42]
Cathcart at the tennis court?
[28:45]
It looks like there was a resurface in 2019.
[28:52]
And we feel like this is the last time we can do a resurface.
[28:55]
Based off the opinions from the contractors, yeah.
[29:01]
How long does a full of reconstruction last before you have to fix it again?
[29:07]
This, the document I have, which was prepared before, it says that the cap cart tennis
[29:12]
court was installed in 1966 with a last resurfaced on in 2019.
[29:20]
This is a may have been a resurfaced somewhere in between.
[29:23]
I mean, there was likely many resurfaces throughout that time frame.
[29:35]
Any other questions, Council?
[29:39]
I mean, I think we all agree this is a band-aid fix.
[29:42]
It needs to be done more permanently,
[29:44]
but the reality is at the moment we've got money to do the band-aid.
[29:48]
We don't have money to do the permanent fix.
[29:52]
So,
[29:56]
the council, or I mean the pardon me, the commission.
[30:00]
For OU, unanimous vote, that was at the park, right when they were there. Correct.
[30:06]
So that was like a week ago. Yeah. So, I'm okay with this for now. I do think those courts
[30:17]
get used a lot. I think they need to be permanently fixed, but I'd rather have people still use
[30:25]
them and use them safely, not trip on cracks or anything and look at getting this permanent
[30:35]
fix into the capital improvement plan in a way that we can fund it properly down the
[30:40]
road.
[30:42]
Yeah, so I think we're not doing it next year and the only thing is we could do this geese
[30:49]
a favorite project by Ronald Placement and a CACR.
[30:54]
That's fiscal year of 29.
[30:57]
I think we just have an obligation to make it usable in the short term,
[31:00]
and then have this discussion next year.
[31:05]
Do I have a motion?
[31:06]
I'll make a motion too.
[31:13]
To prove the quality from ATE Recreation in the amount of 158-940-60
[31:18]
for the resurface against the CACR.
[31:19]
CACR Park tennis court.
[31:22]
Second.
[31:23]
Okay, I have a motion by Gorham in a second by Maddie.
[31:27]
I'll call the matter for vote.
[31:29]
All in favor?
[31:30]
I opposed.
[31:32]
Motion carries unanimously and is here by approved.
[31:35]
We'll now move on to agenda item 4C, Minnesota Green Step Cities Fast Track Co-Hort.
[31:42]
We have a memo that's been prepared by our communications director, Eric Wilson.
[31:48]
Hello, yeah, just here to discuss the green core or the green step cities cohort, I was just about to our attention a little less than a month ago that they created this cohort to help fast track cities that are similar in size to shorewood if they're interested in learning more about the program and or continuing on to another step in the green step cities process so just very briefly the green step cities is a
[32:15]
In our recognition program, there just helps cities with their sustainability goals.
[32:18]
It's managed by the MPCA and provides a framework of 29 different steps, or also known
[32:24]
as best practices across five different categories.
[32:28]
Currently, the city shortage is on step two of the five, and we've completed 11 of the
[32:33]
different best practices.
[32:35]
The way that cities advance through the different steps is by demonstrating improvements
[32:39]
in the performance metrics.
[32:41]
And each action is submitted by a city when they complete it and then it's rated on a three-star system is how it's done.
[32:48]
It's kind of hard to see up there, but this gives an idea of like one of the best practices under buildings in lighting.
[32:56]
And where you see the stars in that second column is an example of actions that show it has completed and the rating that we got based on that three-star program.
[33:06]
So, for example, and changing our lights in the bathrooms to motion sensored lights is one of those steps within the program.
[33:17]
So, yeah, we joined the program in 2011.
[33:21]
In the, like I said, we've completed 11 of 29 steps so far.
[33:24]
Our last assessment was back in 2023, and when you look at some of these things,
[33:30]
I think it's just time if if Council would like to and if the city would like to to reexplore this and do a new assessment just some of the things like
[33:39]
For example, the step to it challenge doesn't like we haven't really participated that in that and it it went away last year so
[33:49]
Recently so so that would be something that we'd want to probably reexplore and reassess with the program for example
[33:54]
But some of those notable actions were like the 24 foot streets allowing that and outdoor wood boilers being regulated.
[34:03]
So the fast track cohort is it's a six month program.
[34:08]
Other cities will come together that are part of the green the green steps cities program.
[34:12]
What it'll be is monthly virtual learning sessions where we get together and learn from each other.
[34:18]
Who's doing what and what's offered out there for technical assistance.
[34:21]
and then just identify there's only practices that
[34:24]
sure what would like to do to continue in the Green Step program
[34:27]
to achieve step three or and also what we could do to apply
[34:31]
to our 2050 comprehensive plan.
[34:34]
And so it just really helped us improve our familiarity with
[34:37]
how we document it, what the Green Step program is,
[34:40]
and really it's an opportunity for us to learn more
[34:42]
and bring back the information to council and staff
[34:45]
to see what we would like to do next
[34:47]
if we would like to continue moving up in those steps.
[34:52]
So, right there is the schedule.
[34:54]
It's, again, just once a month is when we meet,
[34:57]
it'd be, it's an hour long,
[34:59]
and then they do like a 30-minute kind of round table,
[35:01]
where we get to discuss different topics,
[35:03]
and then connect with one another on the different topic areas.
[35:07]
So, that's kind of what I have there.
[35:09]
I kind of leave it up for discussion or questions,
[35:12]
and just see if it's something that you would like us to participate in
[35:15]
and bring back more information about.
[35:20]
Okay, thank you.
[35:21]
Council, any questions?
[35:23]
This is just one staff member, or the whole staff who attends.
[35:27]
Right now it would be me attending, so that's been under the role of my role.
[35:31]
So when I stepped into it, it was Julie's before, so it would be me attending and bringing it back to staff.
[35:39]
What are your questions so far about the program?
[35:42]
My question so far is what I want to look at where we're at with the current assessment
[35:47]
and see what we're currently doing and really update a lot of those things because I do think
[35:51]
there's a certain things that it's kind of like once you achieve it it's done but I'd like to
[35:55]
just look back at it again and kind of actually assess where we're at with it and then secondly to
[36:01]
know what things have we been doing that would that would also kind of count towards it and then
[36:07]
I think one of one of my bigger questions personally is how is the application it's a really good
[36:13]
time with the 2050 complaint, to see how do we build some of those sustainability goals into
[36:19]
that program as well, but I would need to grasp a little bit more information around
[36:25]
the program. It's just something that we haven't really participated in with the transition
[36:30]
of my role, so it's just kind of learning more about it in general.
[36:35]
I'd be interested to know what kind of fiscal commitment some of these steps are.
[36:45]
Even if someone doesn't necessarily mean you go to step three or there other things,
[36:51]
does it we all in? What is a level of commitment we can make?
[36:57]
Right. Yeah, I think that'd be one of the big things to bring back as part of this.
[37:00]
not committing necessarily to go to step 3, not knowing where we are,
[37:04]
fiscally with it.
[37:05]
Because I do believe back in 2022, there was a decision to not go to step 3 by the council.
[37:12]
So what does it look like now?
[37:14]
I guess we'd have to look at it.
[37:16]
Or learn more about it.
[37:17]
And I'd like to know more about why some cities do or don't go to step 3 besides us.
[37:21]
Like what if a city has said no to it?
[37:25]
This is a pertinent to us.
[37:27]
Uh-huh.
[37:29]
Yeah, I can start.
[37:30]
Wait, aptly, and I'll find that find out that information, definitely.
[37:34]
I'm looking through this quite a bit of materials in here and it just seems like it's a heavy lift.
[37:39]
A lot of checklists, a lot of work. A lot of good ideas.
[37:44]
So I wonder if there's a way for us to look at this as a potential idea generator for what we need to do without spending all the admin that it looks like it requires to actually complete these checklists and stuff.
[37:56]
I had the same thought, and we seem to be using you more and more and so if you're doing this what are you doing that's important to us as well.
[38:06]
What sounds like you're getting a not-of-approval council do I have a motion?
[38:11]
Yeah, instead of approval.
[38:12]
I mean, this is just exploratory, correct?
[38:16]
Yeah, that's exploratory.
[38:17]
And then the questions that you, we've all raised.
[38:21]
Mr. Wilson would be able to bring back the accurate information up to date information to the council.
[38:28]
So.
[38:28]
I think the idea of the cohort was intended this fast track one was if if city's want to get to that step three by April,
[38:35]
but I don't think that that's I think we we more so would use it as an exploratory.
[38:41]
That versus committing to going to the state to step three without really knowing what what that all requires.
[38:49]
Okay, because this is a core, this concludes other cities.
[38:54]
And they fast-tracked it.
[38:57]
I think, yeah, I don't know.
[38:59]
I think they just call it fast-track, because it's such within that six-month period.
[39:04]
Where it's usually, I think, longer.
[39:08]
I mean, step one is, like, step one you could argue is really quick.
[39:11]
It's just writing an ordinance, right? Like, that's step one.
[39:14]
So, I think, yeah, I think it's about actual management.
[39:17]
is I think what they call step three and it's actually starting to implements a little bit more
[39:21]
things on that checklist. So potentially it could.
[39:25]
And you don't have to go to all, I mean I watched that video because I thought we were
[39:29]
supposed to do a half hour of my life from never getting back but
[39:33]
it does say that you don't have to attend every thing. If you know your
[39:37]
cities already done these different, you know, ones on the checklist. You don't have to go to
[39:43]
week, so I think it's good to know and then we can have a discussion and see if it meets
[39:50]
our vision or whatever, do the cost benefit analysis and make decisions afterward.
[39:55]
I'm all for getting information.
[39:59]
I'm excited for you to bring back information to the council, because I don't think anyone
[40:03]
on the council really knows what's set 3, 4, 5 or even 1 and 2 consisted of.
[40:10]
So, Council, do you have a motion?
[40:14]
I didn't think there was a motion.
[40:15]
I didn't think there was a motion.
[40:16]
I didn't think there was a motion.
[40:17]
I can say here.
[40:19]
I'll make a motion to authorize staff participation in the green,
[40:22]
step, fast track cohort, and direct staff to report back on key learnings,
[40:27]
completed actions, and opportunities of identified through the program.
[40:31]
Second.
[40:32]
Okay.
[40:33]
I have a motion by Council Member Gorham.
[40:35]
I'm just making sure that matches the resolution.
[40:39]
Close enough, I think.
[40:40]
So this doesn't commit to going to step three, it's just getting more information.
[40:51]
And that resolution was just a original, original. Yeah, it's just a joint.
[40:56]
Okay, so I have a motion by Gorham and a second by Maddie. Any other questions?
[41:02]
All in favor? I opposed motion carries unanimously and here by approved. We look forward to hearing about that.
[41:10]
We'll now move on to four D, the D-paving Minotank Boulevard cost sharing agreement, and I'm
[41:18]
going to turn that one over to Mr. Andrew Buddy, our city engineer.
[41:26]
Thank you, Mayor.
[41:28]
Minotank Boulevard routes through the Northeast portion of Shorewood and several other adjacent
[41:32]
communities.
[41:34]
The roadways have been a challenge from a maintenance perspective because small portions of
[41:39]
are either on the shared municipal boundary or in a several hundred feet of one community and
[41:44]
not the next. So it's been a challenge for to get a comprehensive plan for it.
[41:51]
Communities have attempted to seek outside funding from Midat State Aid to more
[41:57]
comprehensively maintain the roadway, but we're unsuccessful in those attempts a couple of years ago.
[42:03]
Since then, the various communities have really just taken a lead for portions that are in their
[42:08]
community and this most recent one dep haven has reached out to shorewood in late November
[42:15]
of 2025 inquiring of shorewood.
[42:18]
I was spent potentially interested in costume about 850 feet of the roadway because dep haven
[42:25]
was doing a much larger city-wide project.
[42:29]
And this segment is, I guess, specifically between the east end of shoreward city limits
[42:37]
to the intersection of Spencer Lane.
[42:44]
At the time, when D.P. and reached out to us, shoreward was really just finalizing their
[42:50]
2026 capital improvement plan, and did not include the project.
[42:55]
However, staff that have discussions about utilizing funds from their payment management,
[43:00]
CIP, item, or potentially paying D-paving in the year 2027, which they were also agreeable to.
[43:10]
So staff does regularly receive calls and concerns about this segment of roadway.
[43:16]
Some of those are within our city, some of them are on those shared borders, and some of them are not even in our city.
[43:22]
But pavement conditions score for this specific segment that we're talking about is a 29 out of a hundred.
[43:30]
Depaving continued with the design and ultimately awarded a contract to Aztec Court by the St. Joe.
[43:37]
They're currently working on their project within their city.
[43:41]
The estimated cost for shorewood would be 56,905 dollars, and this includes 15% for design and construction administration.
[43:53]
staff have reviewed the estimates and the pricing is favorable and staff has identified funds within
[44:01]
the CIP to be able to fund this piece of the project.
[44:05]
So staff does recommend proving cost share agreement with D-Paven.
[44:10]
I will point out that there is approximately another, I say, 1,300 foot in the segment but
[44:16]
about 1,500 feet just to the west of this that is also in very poor condition, we're reaching
[44:24]
out to the contractor to try and get to get a quote for them to see what it would cost to finish
[44:28]
that piece of it. Then really from anything within the city of Shorewood's Municipal
[44:35]
Boundary assuming that goes forward would be kind of fixed within the last three to five
[44:41]
years. I don't have information on that quote. We just can reach an out to them. If we get
[44:47]
quotes and it's something stuff, things can fit within budget, we would come back to you
[44:52]
at a future council meeting for that discussion.
[44:56]
So with that,
[45:00]
I stand for any questions.
[45:02]
Okay, thank you, council.
[45:04]
My question is if D. Paveons take in the lead in terms of project management, why is there an additional 15%
[45:12]
design fee for sure would it wouldn't that design be happening in D. Paveons?
[45:18]
Yeah, they want to be compensated for the portion that's attributed to our portion of the roadway.
[45:23]
But then it's going to be payable to D. Paveons isn't, sorry, the 15%.
[45:28]
Yes.
[45:33]
If this route is so terrible, 29 out of 100, why wasn't it in the CIP?
[45:39]
A couple of reasons.
[45:41]
Because it's on the shared municipal boundary, when we work with Weisler who does the AI
[45:46]
routing, it broke the lines at the municipal boundary, and then didn't graph them the
[45:52]
first year that we looked at them, and so we didn't catch it the first year we did the
[45:55]
payment management plan, because of that.
[45:58]
Since then, we've noticed that and said, no, we've got to include the whole thing in there.
[46:05]
And at that time, it's kind of like we had already committed to what was in 2025.
[46:11]
And so now this next opportunity is 2027.
[46:14]
It could also be included in the 2027 payment improvement project,
[46:19]
whether it's milling overlay or reclamation.
[46:21]
Would you have, if your tech had picked it up, would you have included this, would this have been in this year's CIP?
[46:34]
I would have to look back at the numbers exactly.
[46:40]
I don't know. I've sent my head.
[46:42]
I think a lot of our previous work in the CIP has been focused kind of on the western part of Sherwood.
[46:50]
Next year's millen overlay is much more focused on low-notic exclusively, but much more focused on the east side
[46:57]
Because there's just you know cost savings and mobilization
[47:02]
So I think that's part of the rationale for
[47:06]
Potentially including it next year or just taking advantage of this opportunity where the road
[47:11]
Where the road the north half is in one one community this health half is in the other and in the municipal line is just it's just
[47:19]
So.
[47:29]
On some other questions?
[47:33]
A couple of things just going through the terms here.
[47:37]
One good thing is we do have approval of change orders related to our work, which is good.
[47:46]
Like they can't do change order for our costs without our approval.
[47:50]
Yeah.
[47:50]
I'm wondering about communications, and are they doing all of our communications to our residents?
[48:01]
We haven't had much discussion on it yet. This work is slated to happen kind of the last week of July.
[48:10]
I don't know that there's many homes that are directly on it. We all have to reach out to them and kind of see
[48:16]
communications they're pushing out and definitely kind of reiterate it from our
[48:21]
channels. I have not seen anything specific though from them. The agreement
[48:27]
authorizes them to communicate on our behalf which seems sound but we should
[48:33]
probably overlay that. No what they're communicating before they do it yes. Or just to
[48:38]
make sure that they're doing it like they're sure we'd rather than it's I don't know
[48:47]
Yes, that is a good point.
[48:50]
In the come to us when they were in the bid process or did they come to us after?
[48:55]
And they're like, oh yeah, maybe we should ask Shorwin, and this is really expensive.
[48:59]
Maybe we should ask Shorwin, like how did this even happen?
[49:03]
Admittedly, most of our neighbors don't have a CIP, like we do, where it's fairly structured and at least predictable a couple of years ahead of time.
[49:13]
Most of the smaller communities like Greenwood, Deep Haven, they're very reactive to the residents and when they get enough calls, if I say yes, let's just go to a project.
[49:25]
It's happened to us a couple of times where they're kind of in the middle of design, or I've already authorized design. They kind of reach out to us first, you know, communication see if we're interested.
[49:38]
And that's usually way past the time where we could put it
[49:41]
at our capital improvement plan.
[49:43]
And so that we've shared those concerns with some of those communities
[49:46]
and say at least get us a year ahead of time, two years ahead of time,
[49:50]
if you think you're going to do it.
[49:51]
So we can plan for it.
[49:53]
But so they reached out during design to see if they wanted to include it.
[49:57]
And they just kind of included it as part of their bid.
[50:01]
And if we say no, then I don't know what they would do.
[50:05]
if we said no, I thought they bid it as an alternate.
[50:09]
It wasn't formally in it.
[50:11]
They had three or four alternates in their bid.
[50:15]
It was a little complicated on how they set it up.
[50:27]
But if there are no other questions, I can make a motion.
[50:33]
I can find a motion.
[50:36]
They told
[50:42]
me, got it?
[50:43]
I moved to approve resolution 26-41 authorizing execution
[50:48]
of the cost share agreement with the city
[50:50]
dep Haven for improvements to Minutonka Boulevard, plus second.
[50:55]
Okay, I have a motion by San Chagrin a second by Gorham. All in favor?
[51:00]
Aye. Opposed?
[51:02]
Aye. Motion carries 4-1 and is here by approved. We'll now move on to agenda item 4-E,
[51:08]
Shorewood Lane, Revene update. Again, we have a memo prepared by our city engineer and
[51:13]
your buddy.
[51:13]
They're
[51:17]
working, or do you, okay, just advance for me.
[51:25]
Thank you, Mayor.
[51:40]
Back in 2004, County Road 19, was improved to its current condition.
[51:45]
And as part of that project, they put in a 30 inch outlet into what is we're referring
[51:52]
to as the Shorewood Lane Revien with that project.
[51:56]
They also constructed Gideon's Glen, which, if you're familiar with, is kind of across
[52:00]
the street from his award and the apartments across the west side of County Road 19.
[52:15]
The Gideon Glen project was very specific. It was intended to handle a bunch of stormwater
[52:20]
and really do the treatment for that project. The nuance of and kind of back then they weren't
[52:27]
focused on this, but you handled all the treatment.
[52:30]
For the entire project, and did all of the rate control over on that side of it, on the west end of the project, but they didn't do any of the rate control over on the east side of the project were this ravine outlets, and so then in 2014, a large storm of an occurred and started to severely erode the channel.
[52:53]
So, this is looking right at that apron outlet, and you can see right out of there that it
[52:59]
does start cutting into the banks three to four feet, here, oh, within the first 20 to 30 feet,
[53:07]
and gets progressively worse down stream, here, I'll just kind of click to this.
[53:11]
These are some of the worst of the worst of the streams really starting to undercut its banks
[53:16]
with erosion and these these pictures are actually from three years ago. So it is it continues
[53:23]
every year I go out there every time I visit it it continues to get worse there's more trees falling
[53:28]
in with that.
[53:33]
So it's overall it's a 30 acre watershed and the ravine falls about 17 feet
[53:38]
over 450 and has an average slope about 4% which is which is pretty steep for this amount of water
[53:45]
not not having like protection to it.
[53:52]
The erosion has been causing a number of vertical side slopes and many
[53:56]
locations, causing trees to fail and fall over risk adjacent properties and
[54:03]
has the body deposited quite a bit of sediment in the downstream wetland.
[54:08]
The child side bottoms are largely unvegetated, largely because of the very
[54:14]
the Overstory canopy trees where the Overstory canopy trees just don't let enough sunlight through
[54:20]
to really have much substantial vegetation on the forest floor. So that is one of the issues with it.
[54:29]
Early coordination has identified that the Army Corps of Engineers had jurisdiction over
[54:33]
the stream channel. Therefore complicated some of the early permitting options that we're out there.
[54:45]
So the project was first, I kind of identified in 2014, I'm not a hundred percent sure when it got added to this capital improvement plan, I kind of got involved around 2020 and the project was kind of handed over us from the previous engineers for us to kind of follow through with.
[55:03]
The original ideas from many of the residents and staff before we even got involved was to really just re-vegetate it.
[55:12]
But as we talked more with permitting agencies and really looked at the logistical challenges of that,
[55:19]
the thick, tree cover really just would not support understory growth.
[55:24]
There was continued an ongoing erosion and so anything that was planted just in the ground would likely get washed out in future storm events.
[55:32]
And then when you actually look at the math and the shear stress that you're seeing it needs something more robust than just some vegetation, essentially temporary vegetation that you put down until it gets fully stabilized.
[55:49]
And so, staff did work with Medihah, so because of those issues, that option was no longer
[55:57]
pursued.
[55:58]
Staff did have some coordination meetings with Medihah Creek Watershed District, probably
[56:04]
about four years ago now, just discuss options and their thoughts and potential funding
[56:12]
sources.
[56:13]
And ultimately, we discussed the memo that we had put together that looked at three options.
[56:19]
The first of those options was to maintain the existing channel slope, and
[56:27]
this is really hard to see on this screen.
[56:34]
But you can see where the laser point kind of comes down to, oh, yeah, there we go, Eric can use the pointer.
[56:43]
The existing channel slope is down here, so it's like 8-8-7 feet deeper than what we're
[56:51]
kind of proposing to do in a preferred slot, preferred option,
[56:57]
but what is the challenge
[56:59]
with leaving it at that steep of a slope, for one, it does increase the shear stress and
[57:04]
the velocities of all the water going through there, therefore, just increasing the rows of
[57:10]
potential.
[57:13]
They were going to put in a couple of rock checks along the way, but ultimately those
[57:16]
were just going to put up a silt and really be non-effective.
[57:21]
They also wanted, or we also explored flattening out the side slopes to three to ones, and
[57:26]
that became very invasive to the adjacent property owners.
[57:33]
And ultimately this option would also to avoid impacts of resonance, would require retaining
[57:41]
walls.
[57:43]
So, a number of these things were very negative about this option, big impacts to the residents,
[57:50]
potential wide range of construction costs with retaining walls, and both the permitting
[57:55]
challenges within the Creek Watershed District and the Army Corps of Engineer.
[57:59]
So that option was not pursued any further.
[58:03]
There was a pipe outlet option as well that we looked at, and this would essentially pipe
[58:08]
from the top all the way down to the bottom at the time the city preferred that from a long-term maintenance perspective.
[58:15]
It handles velocity very well. We could have had islands to connect to collect more water on the stream channel.
[58:23]
It had pretty minor impacts from the neighbor's perspective.
[58:29]
But the challenge with that one is that was largely unpermetable because the Army Corps of Engineers has jurisdiction on it.
[58:37]
They were just starting to start the stream bank impact and if we would have impacted like 450 feet of the stream channel by piping it
[58:45]
We out of had a pay like over around a million dollars in replacement costs for the stream channel so that quickly became unfeasible
[58:55]
So further discussion that we had with me on a creek watershed
[58:59]
We're using a third alternative and that's very similar to what we are proposing here
[59:04]
And that was to use Gabian rock baskets, kind of allowing the side slopes and edge strategic locations.
[59:14]
Those strategic locations are right here where we can have the water kind of fall and dissipate energy throughout here.
[59:22]
Therefore, controlling the velocities and erosion a lot better.
[59:27]
As we spoke about this with the watershed, they did like this idea.
[59:32]
thought it was most permittable, but they thought it could be improved if we used what they
[59:37]
called bioengineered solutions as well. And so what we have done is on the side slopes proposed to put
[59:49]
some bioengineered slopes here, which is basically taking a reinforcement blanket filling it with soil.
[1:00:00]
Rapping it around itself, so kind of like stacks like tacos do up the slope, so you can get a fairly steep slope face, but then that is all reinforced with vegetation.
[1:00:11]
I mentioned earlier that getting vegetation to grow on the forest floor is challenging.
[1:00:15]
We would have to happen with some of this as we do would have to clear out some trees.
[1:00:20]
Many of which are already right at the edge of the ravine or falling in, and so some of that would have to be harvest anyways.
[1:00:27]
So we don't foresee that being as big of a challenge with this solution.
[1:00:35]
We've kind of advanced the plans to about 60% here.
[1:00:38]
We've submitted them back to the watershed a couple of weeks ago to try and get their feedback.
[1:00:44]
We're trying to get their feedback with the concept here, the general alignment, the profile and the cross sections,
[1:00:51]
So that we can move forward and acquire any or secure any easements that we would need from the residents.
[1:00:59]
And so some of these reinforced soil slopes,
[1:01:02]
some, there is an existing easement that was dedicated with one of the plat,
[1:01:06]
but it's only 20 feet wide. Most of these improvements are about 30 to 40 feet wide.
[1:01:13]
And so we would need some easement to cover the permanent aspects of it.
[1:01:17]
We would also need temporary easements to, from a total of four of the residents to be able to kind of get access for construction.
[1:01:27]
So this option was preferred by the many high Creek Watershed District, and that is when in 2003 the construction estimate jumped from 300,000 that we had in the CIP to about 800,000 dollars.
[1:01:40]
And that's where we kind of got the direction and I'm not sure if it was from staff or from council to kind of pump the brakes and let's go for outside funding on this project.
[1:01:53]
We have been fairly successful in identifying and securing some outside funding.
[1:01:58]
Our first attempt was for a MPCA resiliency grant in 2024.
[1:02:03]
Ultimately we were unsuccessful in that one the League of Minnesota cities has a grant
[1:02:09]
navigator where they'll essentially grant cities $5,000 to pay consultants to go after
[1:02:15]
other grants so it helped pay for about $5,000 or fees. Other opportunity and that went
[1:02:23]
towards going after the Hennepink County Opportunity Grant. We were successful in getting the
[1:02:30]
have been county opportunity grant in April of 2024 for $50,000.
[1:02:36]
We were also able to have conversations with municipal state aid, so this is in my opinion
[1:02:42]
a very unique solution in that county road 19 is an MSA roadway for the county.
[1:02:50]
It is not an MSA roadway for the city, but because their water, the county's water drains
[1:02:55]
of an MSA roadway, I was able, we were able to convince state aid that there's a state aid
[1:03:02]
benefit from it, and so they agreed that state aid city could use state aid funds for up to 55%
[1:03:09]
of the construction costs, which at a current estimate is about $440,000 of it. Then the city
[1:03:17]
also applied for an hemp and county cost share grant with largely the same argument. Hay County road,
[1:03:22]
And this is largely contributed by the road that was built back in 2004.
[1:03:31]
And they kind of agreed and also awarded short with a grant of $186,000.
[1:03:38]
So overall the city has been able to skier a total of $681,000 of outside funding for
[1:03:44]
an estimated $800,000 project cost.
[1:03:47]
And ultimately, this reduced the city's cost contribution from $315,000, which we haven't
[1:03:54]
the CIP to approximately $119,000.
[1:03:59]
I do list in the memo of the council dates that we had here in most of them for where we're
[1:04:04]
going after outside funding sources.
[1:04:07]
Some of the upcoming items is we will, the city would ultimately have to approve a
[1:04:19]
to approve of easement acquisition.
[1:04:24]
And of course, approve final plans and authorized bidding.
[1:04:27]
And if that happens, come back for a warning
[1:04:29]
a contract.
[1:04:31]
Current schedule is ideally this is built in the late fall.
[1:04:36]
So in October, November, and even into December,
[1:04:39]
is one of what happened very little stream channel flow.
[1:04:42]
They're able to do a lot of the earthwork.
[1:04:44]
And then some of that vegetation would hopefully pop first
[1:04:47]
in the spring.
[1:04:52]
We did have a one-pager in the packet as well that has some of those items.
[1:05:00]
Sorry, I'm just going to check if I have another slide in here.
[1:05:08]
So, that is an update on this project with that. I'll stand for any questions.
[1:05:13]
Council?
[1:05:15]
Just curious.
[1:05:17]
I'm probably asked this before, but how much of this is private property versus public property?
[1:05:24]
Is it all private?
[1:05:25]
It's all private.
[1:05:27]
It's all private.
[1:05:28]
A portion of it has an existing drain utility is metonate,
[1:05:32]
though we don't have to acquire any rights for,
[1:05:34]
but the other stuff is all private.
[1:05:36]
Is there any imminent danger right now to the homes?
[1:05:39]
I would say right now there's no imminent danger, if this was left unattended, eventually
[1:05:48]
the homes kind of on the
[1:05:53]
homes on the north slope of it are the closest ones to being
[1:05:58]
in danger.
[1:06:01]
Have you ever been any thought about looking upstream like a, where it flows from like in
[1:06:06]
the Badger Park area?
[1:06:08]
Yes, we have. That was really part of the, um,
[1:06:17]
can you advance back up to the first
[1:06:19]
side ahead?
[1:06:22]
Uh, we did. Um, it's a very challenging area.
[1:06:28]
The watershed is largely,
[1:06:31]
well, is the area in blue here. And so a large portion of it is echo road and the city
[1:06:37]
is Badger Park City Hall complex that we're in right now.
[1:06:42]
With the Park Improvement Projects that you did with the lacrosse court and Parking Loss
[1:06:46]
built a sormrater pond here, ultimately all of the water kind of comes out this way and
[1:06:52]
down the ravine.
[1:06:53]
Small portion comes from the fire, police station, and some of it comes from the county
[1:06:57]
and up in county road system.
[1:07:00]
This area here is a new development.
[1:07:02]
They've slowed down their rate to the existing conditions, ultimately what we did look at
[1:07:07]
is because in really high rain events, water does kind of back up through the stream and gets
[1:07:14]
precariously close to city halls basement and city halls basement has been wet the
[1:07:19]
number of times water hasn't necessarily flow directly into it it's more kind of like soaking
[1:07:23]
up through the ground, kind of like from underneath on the cracks through the floor.
[1:07:28]
But we did look at that track.
[1:07:30]
Understand, you know, how at risk is city hall from being flooded. Currently, based off of our modeling, it still maintains like a two foot freeboard and that kind of that meets both the city's requirements and the water says requirements from freeboard from a hundred year bounce on that.
[1:07:50]
And so there's still risk, I'm not saying there's no risk, it's just in the model 100
[1:08:00]
in your storm event, we still show the two-foot separation from getting in. You get more rain
[1:08:06]
more intensely, you could see problems with that or you get something over 100 in your storm event,
[1:08:10]
you could still see issues. The problem is there's no storage in this watershed. What ends up happening
[1:08:17]
is this wetland, oh sorry, this pond and any of the wetland over here are all filled with water,
[1:08:28]
the topography doesn't work to build a larger pond or a wetland basin, or if you did,
[1:08:33]
there's the cost benefit really isn't there. The only way to really improve that is to release
[1:08:39]
more water quickly, which no permanent aid and see what let us do. So part of the part of this is
[1:08:46]
We have to let the water go at its kind of current rates that it's going, but just be able to stabilize the channel downstream from eroding.
[1:08:55]
And so what we are doing to improve that, I didn't explain this completely, is we are flattening out the stream profile.
[1:09:07]
So the existing ground profile is way down here.
[1:09:10]
At like an average of like 4% I mentioned, we're adding a bunch of fill and flattening it out here,
[1:09:16]
so that the velocity slows way down and our shear stresses also decrease significantly.
[1:09:23]
And then we're doing all of the control or not all of it, but a large portion of
[1:09:29]
the vertical drops is where all of that energy dissipates. And so this is all going to be the rock
[1:09:34]
gaping in baskets, so it's going to look like rip wrap in wire-cage baskets is what these
[1:09:39]
three falls are going to look like.
[1:09:41]
Then from there on out, it's pretty close to the wetland, so that is generally what's
[1:09:46]
proposed with that.
[1:09:50]
What would be the consequence of a failure under ordinary rainfall, not the 100 year rain
[1:09:57]
near you that you outlined in your memo, so just like ordinary rainfall like a
[1:10:06]
ten-year storm, not like a hundred-year storm, like something that you know isn't
[1:10:11]
like catastrophic and isn't going to like flood the entire, you know, the
[1:10:14]
basement and everything here, but just, you know, like something that's more
[1:10:18]
than what we normally get, how what's the consequence of that, well, nothing
[1:10:25]
really. I mean the ponds fill up the wetlands fill up just the way they're supposed to levels
[1:10:29]
say low enough. But water, that's with the assumption that water is still releasing out through
[1:10:35]
this channel. And have we thought about like the like what the risks are of the tree removal and the
[1:10:44]
habitat disturbance and all of that since we're talking about that and some of our other
[1:10:50]
discussions because you just said about all the beautiful healthy trees and I was like what we're
[1:10:54]
We're going to have to probably take out some healthy trees if we're going to get all sorts of equipment in there, right?
[1:11:02]
Yeah, Eric, could you advance to our go backwards to some of the photos there?
[1:11:07]
So that is a good point.
[1:11:09]
For us to even build this project and get equipment in their back hose and skid loaders to haul the dirt in there,
[1:11:16]
we do have to remove some trees along really both of the banks in order to do that.
[1:11:23]
I have not come up with a solution to solve this without doing that, and so what we're going
[1:11:28]
to try and do is take advantage of those trees by, at the, I mentioned the reinforced soil,
[1:11:37]
the reinforced soil slope to the soil pillows.
[1:11:40]
Another technique is you take trees that you do kind of harvest those part of those
[1:11:45]
and you kind of lay them down at the bottom of the channel as well, and they also help
[1:11:49]
to detect the bank from erosion and you anchor those there.
[1:11:54]
So it is one way to kind of utilize some of the trees
[1:11:56]
that have to come down.
[1:11:58]
I do understand there's environmental consequences with that,
[1:12:03]
but I think kind of left alone.
[1:12:06]
Many of those trees are going to die in any ways.
[1:12:11]
I'm a couple of other questions.
[1:12:13]
Does this $800,000 estimate include all the engineering
[1:12:17]
easements, permitting, bidding, construction, now and future maintenance. Is that going to be
[1:12:23]
a big cost to you? It includes all of the engineering and construction and potentially easements.
[1:12:32]
I haven't negotiated those easements, so I don't know what they cost yet, but reasonable easements
[1:12:38]
acquisition, yes. So it should include in total project costs from a maintenance perspective.
[1:12:45]
One of the goals was to try and have this be as resilient as possible.
[1:12:55]
The most of this stuff should last for 20, 30 years plus.
[1:13:00]
It may take a little bit of maintenance on the vegetation to either both help and
[1:13:04]
sure that it's healthy and where we're growing where we want to.
[1:13:08]
So I can see that being some potential needs in the future.
[1:13:12]
Otherwise, the gabion rock basket and all those stuff should last 30 plus years pretty easily.
[1:13:20]
My other question is, it says up to 55% are we guaranteed and what are we going to do if it says, well, it's set up to but we got you five percent.
[1:13:29]
Like, how do we know when we know, like, and then there were some sort of seem like there was some
[1:13:34]
on some of these grants, so like how do we make sure that we don't lose the grant because of delays or
[1:13:42]
like timing or any of that?
[1:13:44]
Yep, so I believe these look all grants allow construction to happen in 2027 yet.
[1:13:50]
And so it's 2026, we're trying to build it this year.
[1:13:53]
A lot of those, you just have to start construction too, and then it's still eligible.
[1:13:57]
So we are trying to start here at the end of 2026 yet, and those grants should still be in good shape.
[1:14:04]
As far as the 55% I have an email from state aid hydraulic engineer in the state aid engineer saying yes
[1:14:11]
This project is eligible for 55% of construction so if I come back and say oh, it's not
[1:14:17]
I'll be like well this date you told me this and we move forward with that assumption
[1:14:21]
Because your memo says up to 55% which is why I was asking doesn't say that we
[1:14:26]
Oh, okay, that's 50% yeah, that's how they worded their email you could get up to 55% from state
[1:14:33]
So we'll get 55 percent. Okay. That's my that was my question. And then do you know how much we've already spent on this project and is that money
[1:14:41]
Sound cost or is that part of the 800,000 dollars for the whole thing?
[1:14:48]
So our our fees into this currently are about 150,000 dollars. And so yes at this point those are sound costs. We you know, we don't the plan set is not ready for construction.
[1:15:00]
We need to acquire easements. There's some more work we have to do. We have to get our permits. But it's been kind of a long, it's been all, these projects are challenging because there's so many nuances and with some of the permitting aspects of it, they are challenging to suit all of those needs and try and get everyone happy with what potential solutions are.
[1:15:30]
Plus, you know, some of that effort was to go after outside funding, as well.
[1:15:36]
So this would be, you would start it in the late fall this year, or would you start it late fall 2027?
[1:15:46]
Ideally, you were starting late fall of 2026 this year.
[1:15:52]
Is this in our budget? Is this in our CIP budget?
[1:15:55]
Yes, this has been in the budgets since 2020 for sure, and beyond before that, I'm not sure.
[1:16:03]
But that's all my questions.
[1:16:05]
Thank you.
[1:16:07]
Question, are you aware of a drone video that was taken back in 2019?
[1:16:12]
It's 2014, I saw it.
[1:16:14]
Is it online?
[1:16:15]
Is it available to the public?
[1:16:18]
It's not, but we could make it.
[1:16:21]
We want to know the difference between how it used to look in 2014.
[1:16:24]
It looked better than that.
[1:16:26]
Yeah, we have it on our...
[1:16:29]
I think the WSB did it kind of before we got over,
[1:16:32]
but they shared that as part of the documentation.
[1:16:35]
And yeah, okay, I'd like to see that.
[1:16:37]
And then just to comment,
[1:16:39]
because obviously the train is left the station here
[1:16:41]
in this project, so it doesn't apply to this.
[1:16:44]
But in the future, I think it would be helpful
[1:16:46]
for the council to have a discussion
[1:16:48]
on funding since this is private property
[1:16:51]
and we're improving private property.
[1:16:53]
I think we should have a discussion about who should pay,
[1:16:57]
whether the residents themselves should pay
[1:16:59]
forward, or whether the city or some kind of shared, shared investment.
[1:17:04]
So that's just the comment.
[1:17:08]
We've got one high level question for you.
[1:17:11]
So the point of reducing flooding risk over in Badger Park area, some of the fire district
[1:17:21]
is to move the water more quickly off, like, move the water more quickly under
[1:17:27]
19, right, because we have to drain that more quickly to prevent flooding upstream?
[1:17:33]
Sorry, we are not increasing the flow. That's where I'm trying to figure out how are we going to decrease flooding risk if we're not increasing the flow?
[1:17:42]
Sorry, that was more I was trying to give a little background to geese question about can we solve it upstream and
[1:17:49]
The way to solve it partially upstream is to create more storage and so they knew it
[1:17:56]
hold the water longer and release its lower. We just don't have that option in this water shed.
[1:18:06]
It's in the how are we going to reduce flooding risk if we can't have storage.
[1:18:11]
And we can't increase the off flow rate. Okay, the goal of this project is not necessarily
[1:18:20]
to reduce flooding risk around city hall. It's really just to maintain the channel from where it
[1:18:25]
Let's down to the wild land.
[1:18:27]
And ensure that when we do have big grain of ants and the water does have to flow through here,
[1:18:33]
it can do it without continuing eroding and potentially cause an issue downstream.
[1:18:39]
So this is a flood project.
[1:18:41]
This is an erosion project.
[1:18:43]
Yes.
[1:18:44]
Thank you.
[1:18:48]
Any other questions, council?
[1:18:49]
These are all really good questions.
[1:18:55]
Okay.
[1:18:55]
Well, no formal action is requested.
[1:18:58]
So this was just basically a big debate.
[1:19:00]
So thank you for your update.
[1:19:02]
And then we'll move on to staff and council reports.
[1:19:07]
For staff, we have the quarter two communications report,
[1:19:11]
and that'll be presented by Eric Wilson.
[1:19:14]
That's quarter two communications report.
[1:19:16]
I'll just let it stand for itself.
[1:19:18]
If you have questions or comments, I am here for those.
[1:19:22]
Council, any questions?
[1:19:24]
This is item 5A1, right?
[1:19:28]
Yes, this is 5A1.
[1:19:30]
Okay, so how we capturing resident feedback from this system?
[1:19:36]
From this system.
[1:19:38]
Whenever we get, I would mostly say through the citizen request tracker that is where
[1:19:43]
we get those specific feedback from things.
[1:19:46]
We have different feedback forms.
[1:19:48]
Like the budget one where we have, we've requested feedback.
[1:19:52]
We've gotten one specific thing of feedback on that one that I'm aware of.
[1:19:57]
But that's, this isn't, I guess, necessarily doing the anecdot piece of it.
[1:20:05]
I guess we talked about sort of trying to replicate the functionality of clickfix in the system.
[1:20:13]
So how are we doing that?
[1:20:16]
Or how are we going to do it if we're not doing it now?
[1:20:20]
Of the other, the request tracker, like clickfix piece of things?
[1:20:25]
get more publicly available, so people can see what's going on.
[1:20:30]
I guess that this was making it public so far.
[1:20:36]
This report.
[1:20:43]
Do you have any idea of, like, if there are any resident groups that are under reach, like, maybe the seniors,
[1:20:53]
or...
[1:20:53]
These may only concern is that, like, outputs aren't the same as outcomes, right?
[1:20:57]
So, just wondering what your sense or your feel if you have one is of that?
[1:21:05]
Yeah, in my sense, I would say when it comes to, since electronics, I don't think captures
[1:21:13]
older generations that yet that it would be an underserved piece, and that's the hope
[1:21:17]
of what the print materials that we're hoping that we are reaching them.
[1:21:22]
Again, I don't know, there isn't a mechanism to say who is actually reading it.
[1:21:27]
can only say this is how many we're sending out. I do I know one piece that like I do drop off
[1:21:32]
a box every time the short report comes out and make sure that like over to short with landing
[1:21:37]
for example. So I do do that every time we print the short report. So yeah I don't include that.
[1:21:43]
I deliver myself so we can save a little bit on the postage there but yeah so that's nice touch
[1:21:47]
base with the staff over there. Have you gotten any feedback from any of them by chance?
[1:21:51]
I heard from this staff and they just say they were always appreciative that we've brought it over and that's something new that we kind of started in the last year.
[1:22:01]
So, so they just always enjoyed that that everyone gets one in their mailbox.
[1:22:05]
He must love us.
[1:22:06]
And I think we're doing amazing.
[1:22:08]
You know, each year change anything for the seniors.
[1:22:11]
I knew no one that comes.
[1:22:12]
And I think that that engagement between also I know like the mayor has done a lot of specific that I don't know what you call them.
[1:22:20]
of tea presentations, but probably to mayor.
[1:22:25]
But I think that that has helped open doors
[1:22:27]
to bring elections to them, for example,
[1:22:29]
to bring elections.
[1:22:30]
So season we do go there and do like we let we go there to have them vote there. So they don't have to come.
[1:22:36]
That's great.
[1:22:37]
So we do try.
[1:22:39]
Like if we're talking about things that we should put in the, you know, like highlighting staff or whatever the fact that, you know,
[1:22:46]
you're bringing the shore report to them, the fact that you're bringing elections to them, like those are the kinds of things that would be, I think,
[1:22:55]
I'm mentionedable.
[1:22:58]
I have no idea you're doing that.
[1:23:02]
Anyone else comments?
[1:23:08]
OK, thank you for your report.
[1:23:10]
We'll move on to agenda 5A2,
[1:23:12]
tentative upcoming agenda topics.
[1:23:14]
I'll turn it over to Martin Vinsky.
[1:23:17]
I don't have any updates.
[1:23:20]
Just sharing what we expect to be talking about
[1:23:23]
and I'm getting ahead.
[1:23:24]
OK, thank you.
[1:23:25]
Then we'll turn it over to general staff comments.
[1:23:28]
So, we'll go on the table, Mr. Czech, our Parks and Rec director.
[1:23:33]
Yes, thank you, Mayor.
[1:23:35]
Last week, we had our second task force meeting for the SEC facility analysis.
[1:23:41]
Lots of great discussion again, and the consultant is going to begin preparing some preliminary draft recommendations of what that facility could look like moving forward.
[1:23:52]
So, we'll continue to keep you updated as I have more materials.
[1:23:57]
The annual concert in the park is this Thursday at 6 p.m. at Freeman Park.
[1:24:03]
So, Bacteroc will kick us off at 6 o'clock and then Shale O'LeoBang will follow with a
[1:24:10]
soft serve social in attendance serving up to my screen.
[1:24:13]
So, we got some activities planned.
[1:24:15]
Some fun stuff happened and so come and join some music and this year's event is sponsored
[1:24:19]
or presented by Mid-Cole, and then last update, safety camp is officially full for the summer.
[1:24:25]
So partnering with Mid-Cole community, it has been wonderful, and we got 40 kiddos that are
[1:24:31]
ready and lined up. So that'll take place here in August, which is approaching faster than you think.
[1:24:37]
That is all I have. Thank you.
[1:24:39]
Okay, thank you, Mr. Buddy, our city engineer.
[1:24:41]
No updates tonight. Mr. Wilson, Communications Director,
[1:24:47]
We'll have three sales will be coming up pretty soon, so we'll announce the trees for that for people to purchase.
[1:24:53]
We also have the back to school supply drive happening so you can drop off school supplies here at City Hall through August 13th.
[1:25:00]
And there's cycling committee we're working on scheduling a tour of the WM Murph site coming up here in the next couple months.
[1:25:06]
So we'll be announcing that date once we have that set up as well.
[1:25:09]
Great. Thank you. Mr. Shepherd, our city attorney.
[1:25:12]
I think Mr. Nivinsky, city administrator?
[1:25:16]
Mr. Czech mentioned, music in the park will also be having a pop-up event for the comprehensive plan at that event.
[1:25:24]
So please encourage folks to stop by and talk with our planners about sure would and what it might look like in the future.
[1:25:33]
We've been working quite a bit on city budget and public safety budgets, so that's been taking up a fair amount of time.
[1:25:40]
And then we have night to night coming up, I believe it's October 4th, so if you have a
[1:25:48]
neighborhood that you would like to have police and a fire stop by, please contact South
[1:25:53]
Lake Minotonka.
[1:25:55]
Police Department, Laura, will help get you scheduled and Mayor and Council, we've in the
[1:26:00]
past kind of gone out with some of the fire crews or police officers.
[1:26:07]
If you would like to do that, please let me know and I will share that with the police department
[1:26:13]
and get you in a group going out.
[1:26:17]
It's all I have.
[1:26:19]
Thank you.
[1:26:19]
Now, we'll do council reports.
[1:26:21]
Councilmember Dicertillo?
[1:26:23]
I have nothing to report, but I did have a question.
[1:26:27]
Our resident pointed out to me that on our Google advertisement, it says that the SEEC is only
[1:26:33]
open from 9 to 330, is that correct or is that just a mistake?
[1:26:41]
So, generally speaking, the building is open when it's in use.
[1:26:48]
It's something that's being discussed with the task force of what that looks like.
[1:26:53]
But that is, I mean, generally speaking, kind of the, when the senior programming is taking place,
[1:26:58]
and there's guaranteed staff in the building.
[1:27:01]
weeknights if we have a rental the building will be open but if we don't have anything in
[1:27:05]
the facility it will not be. So that's something that's being looked at through the task force
[1:27:12]
of kind of the marketing and promotion, promotional side.
[1:27:17]
Thanks. I'm going to make a question. How's the number Gorham?
[1:27:20]
You know, earlier we were talking about the through being project and I mentioned possibly
[1:27:28]
They're looking at, like, a root cause analysis of how engineering costs in this project
[1:27:37]
as a microcosm has evolved and how capital, and how the relationship between consultant
[1:27:44]
costs and construction projects,
[1:27:50]
how it, maybe the approval process looks like, and I'm wondering
[1:27:56]
And this is a good, a lot of history about the ravine, but I'm wondering how it relates
[1:28:03]
to the 150K and some crafts, if that came incrementally to council as well, how we get
[1:28:12]
visibility to that.
[1:28:14]
I'm not sure, because I was thinking about this in relationship to the future, meeting topics.
[1:28:18]
If there isn't a separate meeting topic about, maybe, how we, how engineering costs are controlled in a capital cost environment and using this project as a test case, or maybe a case study of how we might get better visibility to non contractual capital cost related to the project.
[1:28:45]
to project cost, kind of monitoring project costs
[1:28:48]
as projects are evolvenic, right?
[1:28:51]
So is there an internal threshold
[1:28:53]
where we ask for a council action?
[1:29:00]
I think in some cases, it's probably very clear
[1:29:05]
like as you're moving through, let's say,
[1:29:07]
a street reconstruction project,
[1:29:09]
there are things that are fairly well defined.
[1:29:12]
project like this that's, you know, covered what, 16 years and two consultants and, you know,
[1:29:22]
the kind of an unusual project, but I think the question is sort of a long line of whenever we have a project,
[1:29:31]
what are our check-in points and how do we, as you put it, put visibility on what we're spending and where we're at,
[1:29:38]
And that may be more prescribed in certain cases, and it may be less prescribed or have to be sort of talked about on the front end of a project.
[1:29:49]
So I'm happy to try to take a look at that with staff, and, you know, visit this with you and give you some thoughts and get your reactions.
[1:30:00]
So, if that's something that the council wants to see more of, I think we have to do it about on that.
[1:30:05]
Well, we item or just something you'll come back to us with a recommendation on.
[1:30:10]
Yeah, I mean, at the moment, I'm not exactly sure what I will bring back to you, but perhaps as we talk about what we're doing with engineering,
[1:30:22]
And, you know, we have some check-in points that Mr. Moron is planning to check in with.
[1:30:30]
And maybe we start to wrap something in there. We can either look at projects that we have going on,
[1:30:35]
or maybe develop some guidelines or process, or it's sort of the next ravine type project that we take on.
[1:30:44]
We have that conversation on the front end.
[1:30:46]
So let me give that some thought and we'll try to get back to you.
[1:30:52]
But I think I think tying it in with our overall engineering
[1:30:56]
conversation is maybe a good place to put that.
[1:31:00]
So thanks.
[1:31:02]
Is that, I don't remember, San Chagrin.
[1:31:03]
Nothing from me.
[1:31:05]
I think I can't remember, Maddie.
[1:31:06]
Nothing from me tonight.
[1:31:07]
Come on.
[1:31:10]
Tended the LMC, I don't think anyone cares about our continuum
[1:31:13]
education, but yeah, the LMC conference,
[1:31:16]
was a couple weeks back in Rochester and it was as always the LMC puts on a pretty good program
[1:31:21]
and some good learning. That's in a my report and I agree it was a good good conference.
[1:31:28]
I have a couple reports so the SLMPD coordinating committee met last week and the 2025 audit
[1:31:36]
is complete. We were given a clean opinion by Abdo. This is a new auditor this year for the SLMPD.
[1:31:49]
And the Fourth of July, the SLMPD, EFD and the Rotary and several other organizations that were all involved are going to be having a debriefing to talk about things that went right, things that went wrong,
[1:32:05]
future for the July event, et cetera, because as you know, that was no longer handled by the chamber of commerce this year.
[1:32:14]
The budget for 2027 is still in discussions.
[1:32:19]
We're going to, sure what's going to have a big increase.
[1:32:22]
The big expenses are going to be the flat roof and battery backup system replacement for the SLMPD.
[1:32:31]
the record's management system replacement and vehicle leases. Also over the years we've
[1:32:37]
discussed the 18th officer. No, it doesn't. It's not. And I mean everything is going up.
[1:32:48]
Wages are going up. The paid family medical leave act impacts our department. There's a lot
[1:32:53]
things that impact it. As you know, our SLMPD is paid through a funding formula and one of
[1:33:03]
the factors in the funding formula is the population of the cities, the member cities, one
[1:33:11]
is the property values of the member cities, calls of the member cities, and our percentage when
[1:33:18]
we put in the new numbers, our percentage is going from 49.7% to 52% of the budget will now be
[1:33:27]
sure would. And that's based on the formula that's in the JPA. So not only are costs going up,
[1:33:36]
including that roof, but our percentage of the costs have gone up. And so did Tanka Bays and
[1:33:44]
Excelsior and Greenwood went down, slightly.
[1:33:49]
And that's the formula.
[1:33:52]
The police chief is coming.
[1:33:55]
He'll be at our July 27th city council meeting,
[1:33:59]
and that's after the next SLMPD coordinating committee meeting,
[1:34:03]
which is July 22nd.
[1:34:05]
So if there's questions, you guys want to present
[1:34:08]
at the actual coordinating committee meeting,
[1:34:11]
either let me know or you're welcome to attend but the chief will also be here on the 27th.
[1:34:20]
And then the last thing with the SLMPD informed you that the JPA, which is the document governing the SLMPD, states that the members of the coordinating committee shall be the mayor's of each city.
[1:34:37]
And the members of the operating committee shall be the city administrator or a manager whatever applies to that member city.
[1:34:47]
Greenwood does not have a city administrator.
[1:34:51]
And Greenwood does have a staff member who does work remotely on their behalf and has attended different things remotely via video on behalf of Greenwood.
[1:35:05]
We've been discussing this for over a year, as you know, we hired an independent attorney
[1:35:10]
to render an opinion on this issue.
[1:35:13]
The attorney's state, it's basically improper for the administrator and the mayor to be the
[1:35:21]
same person because one is an elected official and one is not an elected official, and yet
[1:35:28]
They're both acting in basically a dual capacity.
[1:35:33]
One board has the ability to hire fire and set the pay increases in bonuses of the chief.
[1:35:40]
But the other board has meetings on the day-to-day operations of the police department,
[1:35:47]
and that can make it very difficult for the chief and the other administrators when someone
[1:35:52]
on that committee is also has the ability to fire the chief.
[1:35:58]
Long story short, the other mayor's voted three to one that we do not want the mayor of Greenwood.
[1:36:08]
It has nothing to do with the individual currently in that seat to continue attending the operating committee meetings.
[1:36:15]
and Greenwood has disputed this very vehemently, and Greenwood stayed at our last coordinating
[1:36:23]
meeting that they have considered looking at depavened police department as an alternative,
[1:36:30]
and the board is at an impasse, so we are possibly exploring some mediation options, as well
[1:36:38]
as going to run this past the appropriate League of Minnesota City's representative.
[1:36:44]
So, will that cost us money in, like, attorney fees?
[1:36:49]
That's, we're only exploring things at this point.
[1:36:51]
That is the question being posed to the league at the moment.
[1:36:55]
The mediation at the moment, it is the three cities position
[1:37:01]
that Greenwood has, if they pursue and challenge this vote,
[1:37:07]
they are the aggrieved party, the board has spoken,
[1:37:10]
and they aggrieved party pays for mediation, so green would would pay to mediate, green
[1:37:18]
would denies that and says the three of us are the aggrieved party, because basically we're
[1:37:23]
not doing what they want, so come back to us for like discussion before you make it to the
[1:37:30]
We're going to pay for it. Absolutely. At this point, it's just been discussions. And I think I'm painting a pretty accurate picture, Mr. Nivinsky was there as well. And it's a pretty hot topic and problems before, like, has he done something that's untoward, illegal, unethical, like, what? I mean, if it's been operating this way,
[1:37:59]
for ever what changed that we decided that all of a sudden it's not
[1:38:05]
copicetic.
[1:38:06]
Um,
[1:38:08]
it's a difficult question.
[1:38:11]
I don't, I don't think that it's been operating that way forever, but it has been operating
[1:38:16]
that way for some time.
[1:38:18]
It's been operating somewhat similarly on the fire side and at one point historically
[1:38:24]
had become an issue and was not, I guess I don't, I mean apparently nothing changed because
[1:38:32]
that's the situation that there's still in.
[1:38:37]
I think that there are some questions that have just been raised as that apartments gone
[1:38:42]
through some processes about the appropriateness of that arrangement.
[1:38:47]
There is a term in state statute.
[1:38:51]
What are my, you know, incompatible, yeah, incompatible offices and we might be kind of dealing
[1:39:01]
with that in this situation.
[1:39:04]
So I think ultimately it's trying to figure out how do we, how do we come to some sort
[1:39:09]
of term or agreement, green woods interest is certainly, you know, trying to represent
[1:39:15]
its residents and its interests through the process in the same way that the other cities
[1:39:21]
get to represent their residents and interests in the processes.
[1:39:27]
Hopefully, working with the
[1:39:29]
league, I reached out to the office, the state office of collaboration and dispute resolution,
[1:39:36]
and they referred me to the League of Minnesota cities who has also has dispute resolution,
[1:39:42]
so I'm going to meet with them later this week to talk through this issue a little bit and see if
[1:39:45]
there's a fit, and see if we can't maybe try to come to some
[1:39:50]
amicable conclusion here.
[1:39:52]
Good.
[1:39:53]
Housing as harm?
[1:39:56]
I think some of the things that have come up have been
[1:39:59]
around good governance and some confusion about is the police chief
[1:40:10]
getting direction from the quote unquote administrator or from a
[1:40:17]
And as administrators, we don't have any direction over the chief.
[1:40:22]
We are merely the chief's peers.
[1:40:24]
We are there to advise and to provide guidance and support.
[1:40:29]
But we're not the chief's boss.
[1:40:34]
So it's a little bit of an awkward situation.
[1:40:39]
And as it has been a big problem, maybe not.
[1:40:43]
But could it be a problem in the future?
[1:40:46]
There is that concern that all of the cities have now raised.
[1:40:52]
So could one simple solution be that Greenwood gets a resident volunteer
[1:40:57]
to serve in that capacity?
[1:40:58]
That was proposed by one of the member cities and that was immediately rejected by Greenwood.
[1:41:04]
It was also proposed.
[1:41:06]
We've made different proposals of the different cities proposed having a council member in that role.
[1:41:11]
That was rejected by Greenwood.
[1:41:14]
proposed that Greenwood could meet any time they want which we all can with the chief and discuss
[1:41:20]
things at length that was rejected by Greenwood. So I mean I think this member cities have
[1:41:29]
tried to make this work and we're taking the next step which is not a cost to us at this point and if
[1:41:37]
if it can't be resolved and there would be a cost proposed of course that would come to the council.
[1:41:42]
It seems similar to having the mayor, but also being on the police board.
[1:41:50]
You're not representing, you're not acting as a mayor of Shoreway, you are acting as the board member.
[1:41:56]
You can separate those things clearly.
[1:41:59]
That's why I guess we'll get more information on this because it doesn't make sense to me that that person can't operate clearly in different roles and capacities.
[1:42:10]
Like when I'm wearing this hat, I do this when I'm wearing this hat, I do this and I have to represent this equity when I am acting as a board member and this equity when I'm acting as an administrator.
[1:42:22]
So, you know, that's I guess maybe LMC will explain that to us better, but it doesn't seem strange to me, especially for a city of like so few people.
[1:42:35]
And I think that's their argument that they're so small and they don't have all of those resources,
[1:42:45]
but I think that the potential conflict comes in when there's someone with a position of authority as a board member who's also functioning in administrative capacity.
[1:43:01]
And that line, I mean there's not a clear line, because you're always, you're always an elected official, right?
[1:43:12]
So I think that's where the concern is coming from.
[1:43:18]
And so something we're going to have to try to work out.
[1:43:26]
Any other questions about that topic?
[1:43:28]
Yeah, it's, as I said, we did hire an independent attorney who rendered an opinion that we are following through with.
[1:43:40]
So, we had a meeting last week with Senator Ann Johnson Stewart and her mayors.
[1:43:50]
She brought up different topics, e-bikes, property taxes, the housing bill, which it did not pass this year.
[1:44:00]
It is coming back again.
[1:44:02]
That is the bill that would strip away a lot of local control.
[1:44:07]
And Highway 7 did not get any funding in this last legislative session.
[1:44:12]
Today, the regional council of mayors had their superintendents along,
[1:44:16]
So I took along with the Mayor of Minitanka and the Mayor of Greenwood, our Minitanka Superintendent David Law.
[1:44:24]
And then last week at the SEC, the Sherwood Community and Event Center, we had a blood drive.
[1:44:31]
So for everyone who was helping with that, thank you.
[1:44:36]
And I got my little, I'm a donor, t-shirt.
[1:44:41]
And then the last thing I just want to say is that Larry Brown, our former city employee, did pass away.
[1:44:50]
He served approximately 27 years with the city of Shorewood in various capacities.
[1:44:56]
He had a civil engineering degree from North Dakota.
[1:45:00]
University. He served as surewards director of public works, surewards city engineer. He served as the interim city administrator, several times when we were between administrators. He was a devout man, a great cook, a barbecue master,
[1:45:17]
survive by his wife, D, and two sons, and five grandkids, and he'll be greatly missed by a
[1:45:23]
lot of people in the city. So I just putting that out there, he, you know, being here that
[1:45:29]
long, a lot of residents encountered Larry. So, and that's all I've got. Anything else, Council?
[1:45:35]
So, well, let's note, tomorrow is the start of the filing period for City Council candidates.
[1:45:44]
We'll, Sandy, notify the council or should we just refresh the Secretary of State page.
[1:45:53]
I will ask Mr. Stone what exactly we've done in the past since it's been two years.
[1:45:59]
I'm sorry, I don't remember that detail.
[1:46:02]
And we will follow our protocol, so we'll communicate with council on that.
[1:46:08]
I'd like to look at the Secretary of State or what for emails.
[1:46:11]
Good point.
[1:46:12]
Thank you.
[1:46:13]
Anything else, Council?
[1:46:15]
Do I have a motion?
[1:46:17]
I move to adjourn.
[1:46:18]
Second.
[1:46:19]
I have a motion by San Chigrin a second by Maddie to adjourn the meeting all in favor.
[1:46:24]
Aye.
[1:46:24]
Opposed.
[1:46:25]
Motion stands unanimously.
[1:46:26]
It's 8.
[1:46:27]
53 PM and we are hereby adjourned.