[0:25]
>> Everybody welcome to the Thursday September 3rd meeting
[0:28]
of the Planning Commission.
[0:30]
This is being held in the library Parks and Rec building
[0:33]
Council chambers.
[0:34]
Please fill out a speaker card and give it to the clerk.
[0:37]
You'll have three minutes to make your comments.
[0:39]
Please note all commission time limits and rules of decorum
[0:42]
will apply to public comments.
[0:44]
This meeting of the South San Francisco Planning Commission
[0:47]
is hereby called to order.
[0:48]
Will you please stand and join in the Pledge of Allegiance.
[0:56]
[Reciting Pledge of Allegiance]
[1:09]
Thank you.
[1:10]
May we please have a roll call?
[1:18]
[Reading names]
[1:34]
Commissioner Tzang and Commissioner Funes are absent.
[1:38]
Chair Pamukcu: Are there any changes to the agenda?
[1:40]
Any announcements from staff?
[1:44]
>> No staff announcements.
[1:47]
Chair Pamukcu: Then does any member of the public wish
[1:49]
to address the Commission for an item that
[1:51]
is not on the agenda tonight?
[1:52]
If so fill out a speaker card and give it to the clerk.
[1:57]
>> We have no members of the public that would like
[1:59]
to provide public comments.
[2:02]
Chair Pamukcu: With no speakers then we will move on.
[2:04]
Next on the agenda is the disclosure
[2:06]
of ex parte communications if any commissioner
[2:09]
has had communication with applicants
[2:11]
dig site or project physics had interactions with third parties
[2:14]
or have any conflicts regarding any items on the agenda you may
[2:17]
disclose them at this time if you
[2:18]
would like to recuse yourself for an item you can also do that
[2:21]
at this time.
[2:25]
Hearing none.
[2:26]
We will move on to the next item which is the consent calendar.
[2:33]
May we have a listing of the consent calendar items?
[2:38]
>> Item number one is consideration and approval
[2:40]
of minutes from the July 16th 2026 Planning Commission
[2:44]
meeting.
[2:45]
Item number two is consideration and approval of minutes from
[2:49]
the July 16th 2026 Special Planning Commission Meeting.
[2:55]
Chair Pamukcu: Thank you.
[2:56]
Does any Commissioner wish to pull an item from consent?
[3:00]
Does any member of the public wish
[3:01]
to address the Commission for an item on the consent calendar
[3:04]
at this time?
[3:05]
If so please fill out a speaker card and give it to the clerk.
[3:09]
>> We have no members of the public who would like to provide
[3:11]
public comments.
[3:13]
Chair Pamukcu: With no speakers can
[3:16]
I please have a motion on the consent calendar?
[3:19]
>> I'd like to make a motion to accept the consent calendar.
[3:24]
Chair Pamukcu: Roll call please.
[3:30]
[Reading names]
[3:42]
Chair Pamukcu: Thank you.
[3:43]
The consent calendar is approved.
[3:45]
Next item on the agenda is item number three.
[3:48]
Will the clerk please read?
[3:55]
>> Item three this evening is a report regarding resolutions
[3:58]
approving a request for a use permit design review
[4:02]
and tentative map to construct the Genentech research and early
[4:08]
Development Center project in the master plan zoning District
[4:11]
in accordance with the titles 19 and 20 of the South San
[4:14]
Francisco Municipal Code and making a determination that
[4:17]
the phase one redevelopment projects are fully within
[4:20]
the scope of environmental analysis as described
[4:27]
in the Checklist and Addendum and no further environmental
[4:30]
review is required per guidelines sections 15162,
[4:35]
15164, 15168, n 15183.
[4:40]
And then items three A and three B
[4:43]
are the associated resolutions.
[4:47]
Chair Pamukcu: Thank you.
[4:49]
We are opening the public hearing
[4:50]
and calling for staff report.
[4:54]
>> Good evening Chair and Vice Chair and other commissioners I
[4:58]
will be presenting on behalf of staff this evening.
[5:04]
So as we are all aware in 2026 is the 50th anniversary
[5:09]
of the founding of Genentech.
[5:13]
And this aerial shot shows the growth
[5:16]
they've achieved in the first 50 years at South San Francisco.
[5:18]
This evening we will discuss their first step
[5:21]
in achieving their vision for the next 50 years
[5:23]
in South San Francisco.
[5:24]
As you are aware the city regulate
[5:28]
what is allowed on the campus through the Genentech campus
[5:35]
Master plan which was recently updated in 2020.
[5:38]
The Master plan establishes an overall development envelope
[5:42]
providing flexibility and a mix of use types
[5:46]
to be built over time if they implement transportation
[5:51]
management throughout the campus area.
[5:52]
One of the primary goals of the 2020 Master Plan
[5:55]
is to create a strong campus centered environment
[5:58]
with the upper campus as the heart of the campus.
[6:05]
Staff and their project team will
[6:07]
go into more detail on the overall vision
[6:08]
and implementation for the changes to the upper campus
[6:11]
but at a high level overview Genentech
[6:15]
has identified a redevelopment program
[6:17]
that consists of six separate but interrelated
[6:20]
campus developments.
[6:21]
Each of those is identified on the slide.
[6:25]
This evening the Planning Commission
[6:29]
is only considering entitlements for the first and largest
[6:32]
portion of the phase one redevelopment projects.
[6:35]
The research and Early Development Center .
[6:41]
Each of the other five development projects
[6:43]
will come back before the Planning Commission
[6:45]
for a use permit and approval at some point in the future.
[6:55]
The project would consist of six new rectangular shaped R&D
[6:59]
buildings with approximately one point 3,000,000 square foot
[7:03]
of total area .
[7:10]
These are larger buildings that take up
[7:12]
the majority of the right hand portion of the site.
[7:16]
To the left or west is a regional utility plant
[7:20]
and electrical distribution hub that would serve the center
[7:24]
project and most of the rest of the phase one redevelopment
[7:27]
projects.
[7:28]
As I show this overview rendering
[7:31]
I'm going to pause the staff presentation
[7:34]
and allow the Genentech to walk the Commission
[7:38]
and public through the proposed project design
[7:41]
layout and other important details.
[7:42]
After the applicant's presentation
[7:45]
I will come back and talk the Commission
[7:48]
through the requested entitlements
[7:49]
and with that introduction I will hand off the presentation
[7:54]
to Sophie Martin.
[8:08]
>> Thank you very much and good evening chair vice chair
[8:10]
and commissioners.
[8:12]
I lead site planning for the campus of South San Francisco.
[8:16]
I am joined this evening with Foster and Partners
[8:20]
our architect and Kelly Johnson with the design studio
[8:25]
our landscape architect.
[8:27]
I'll begin by talking through a little bit about how
[8:30]
this project fits into our overall vision for the campus
[8:34]
and then hand it to Ben to walk through the architecture.
[8:38]
We are celebrating 50 years here and very proud of that fact.
[8:44]
They have grown together over the last five decades and we are
[8:47]
very excited to bring this project to you this evening
[8:50]
as it represents the next major step in our ability to continue
[8:56]
that legacy of innovation and service of patients for decades
[9:00]
to come anchored here .
[9:05]
As Billy mentioned today you can see our existing campus occupies
[9:11]
four point 8,000,000ft² on approximately 225 acres
[9:16]
on the far eastern end of Oyster Point.
[9:20]
All told the campus comprises about 58 buildings
[9:25]
and an overall FAR of just 0.5.
[9:33]
In the future our proposed campus
[9:36]
will include a portfolio of buildings
[9:38]
that Billy mentioned that come together and work together
[9:43]
to address our fundamental business needs to enhance
[9:46]
our employee experience and to provide
[9:49]
the necessary infrastructure all of these projects
[9:54]
together which I'll highlight in a moment
[9:56]
will comprise development on our site represents over half
[10:03]
of that new development.
[10:06]
I also want to emphasize this redevelopment of our site is
[10:11]
fully consistent with the master plan adopted in 2020 with
[10:15]
the goals of that creating a denser more pedestrian oriented
[10:19]
environment as Billy mentioned is also consistent with
[10:22]
the city's General plan .
[10:27]
This map highlights all of the projects that together comprise
[10:29]
what we refer to as phase one.
[10:32]
It's the largest and the first in line.
[10:36]
It's the biggest and most complex.
[10:38]
It will take the longest to build
[10:40]
which is why it is coming before you here first.
[10:44]
From the sequa standpoint all of these projects
[10:48]
are disclosed and analyzed together
[10:49]
because we expect to be constructing and delivering
[10:54]
them and operating them more or less simultaneously.
[10:57]
We are still working through the exact phasing plan
[11:00]
of these projects but we thought it
[11:03]
was prudent and appropriate to consider
[11:06]
their effects cumulatively which is why they are all
[11:09]
shown together.
[11:12]
But tonight we are really going to focus
[11:17]
on the center specifically as well as the modifications
[11:20]
to the existing parking structure
[11:22]
that lies just to the south which we will refer to
[11:24]
as parking structure a.
[11:26]
There will be some modifications to that structure that link it
[11:29]
to the center and help provide a connection across our very
[11:34]
hilly campus for the teams that work
[11:37]
in the southern Subcampus who collaborate with those who
[11:41]
will be located in the center.
[11:43]
The other projects will come forward
[11:47]
over the course of the next several years
[11:49]
as I said still working through that exact phasing process
[11:53]
but you will get a glimpse of some of them this evening.
[11:57]
Finally we are also proposing a tentative map that
[12:00]
will consolidate parcels on our upper campus enabling
[12:03]
the placement of all of these new buildings
[12:06]
as well as the rerouting of the utilities
[12:08]
that is necessary to serve them accordingly.
[12:11]
So with that I will hand it over to walk through the G center.
[12:23]
>> Thank you Sophie.
[12:24]
Good evening.
[12:24]
So perhaps to reiterate the point
[12:27]
that's just being made before the area which we are going
[12:29]
to be looking at the area highlighted
[12:31]
within that green boundary with a larger hatched area referring
[12:35]
to the rest of phase one to cover subsequent applications
[12:38]
so you can see those structures plus the parking structure
[12:43]
and here you can actually see a more rendered site plan which
[12:49]
shows everything in context of the master
[12:51]
plan of the rest of phase one.
[12:55]
Highlighting that to the west which
[12:58]
is enabling an all electric campus
[13:00]
and removal of fossil fuels as part of the project
[13:03]
and then these signs and lab buildings.
[13:08]
Access to the site will remain via DNA way, primary vehicle
[13:15]
access and also on East Grand Avenue
[13:19]
will provide continuing access to the parking structure
[13:22]
from the South campus there and then
[13:24]
there's a number of fire and service roads
[13:27]
which are highlighted in orange which circulate around the phase
[13:31]
one buildings providing servicing and ability
[13:35]
to maintain safe operations for the buildings themselves.
[13:38]
The campus plaza in the center is a pedestrian core.
[13:44]
The idea behind the campus master plan and our vision plan
[13:50]
is really thinking about what is the future?
[13:53]
The future is how do we transform these buildings which
[13:55]
are aging out and how do we serve the needs of science
[13:59]
in the future?
[14:00]
There are a number of processes drawn out
[14:03]
across a very difficult terrain which is also compounded
[14:06]
by quite difficult weather as we have this evening as
[14:09]
well so the big idea is bringing everyone together
[14:12]
closer on the upper campus on the upper terrain
[14:16]
and bringing groups of scientists
[14:17]
together to work better and collaborate.
[14:20]
On the core of that is creating a flexible planning building
[14:25]
block which is universal and flexible and will stand the test
[14:31]
of time and by combining these together to create these
[14:34]
collaborative clusters we create a diagram which overcomes
[14:37]
the scale of what would be a very large building at one point
[14:41]
2,000,000ft² if it was just one singular building it would be
[14:44]
massive.
[14:45]
This actually brings the scale down and embeds it
[14:47]
into the landscape opens up views landscape daylight
[14:53]
and access at different points.
[14:55]
And gives it something more of a terrain of a campus
[14:59]
feel than a consolidated building.
[15:02]
So the building itself consists of largely a combination
[15:07]
of workplace and lab space and collaboration space
[15:12]
between those which rises up from a service level at level
[15:18]
one through two lab and workplace all the way up
[15:24]
and then there is mechanical spaces on the service level
[15:28]
and at the rooftops as well.
[15:30]
The expression of the building is really
[15:33]
something we spent a long time to think about what
[15:36]
is the integrity of the site and the integrity of expression
[15:40]
here is really based around scale, the human scale,
[15:45]
the scale of the structure and expression of a concrete frame
[15:48]
and the expression of passive shading elements
[15:51]
to reduce the solar gain on the facade to reduce the overheating
[15:56]
and create an incredibly high performing facade
[15:59]
which maximizes the views and daylight of this location.
[16:03]
And material terms we are looking
[16:06]
at a combination of concrete and light tones
[16:11]
a spandrel which is the balustrade of the floorplate
[16:16]
and perhaps a rippled glass which picks up
[16:19]
the light of the site vision glass
[16:21]
and then aluminum panels for the shading.
[16:24]
And you can see here the building
[16:27]
uses the terrain of the site to modulate
[16:29]
the scale so as this terrain is sloping in different directions
[16:34]
across the site at some point we are digging in
[16:37]
and we are concealing the scale of the building
[16:40]
so it can appear as a four story building or at other points
[16:43]
appears as a five story building so we are playing
[16:45]
with that scale and here for instance in the east west
[16:49]
section you can see how we are using
[16:51]
that to reduce the scale by bringing that down and sinking
[16:57]
the loading dock out of public line of sight
[16:59]
to enhance the environment.
[17:03]
Here you can see through these cross sections
[17:07]
the red line representing the existing topography and how
[17:10]
we are working with that topography
[17:12]
and sometimes digging in and sometimes filling in
[17:15]
to actually conceal the mass of the building
[17:18]
to bring the scale of the buildings down.
[17:20]
And here you can see the overall composition of how they come
[17:24]
together and their mechanical penthouses which are all
[17:28]
screened on all four sides taking a lot of effort to screen
[17:31]
all of the mechanical systems also on the regional utility
[17:34]
plant which also consists of a thermal storage tank which is
[17:37]
highly efficient and a sustainable way to store heat
[17:41]
and cooling for the building so we don't need fossil fuels .
[17:48]
This is a view where you see it from its full story viewpoint.
[17:52]
This is from the Northwest looking towards the southeast .
[17:56]
This is a view which you can see is the view looking down
[18:00]
towards the bay.
[18:02]
This is the central plaza between this building
[18:05]
and the next part of phase one which would be a rich employee
[18:09]
experience connect the buildings at different levels
[18:14]
and then here very important is to create a space where
[18:18]
scientists can come together and feel at one with nature
[18:22]
and be stimulated by nature come and be sheltered
[18:25]
from the wind which as we all know
[18:27]
is very strong at different times of the day
[18:30]
and this very human scale courtyard is something
[18:32]
very important in.
[18:36]
Lastly this is the connection back
[18:39]
if you're coming from the parking structure into work
[18:42]
this is your connection from the south.
[18:45]
You can see the way that the blades and the materiality
[18:48]
of those has the opportunity to pick up colors
[18:50]
of the landscape around it.
[18:52]
And then this is the view from the southwest --
[18:57]
southeast looking Northwest.
[18:59]
There's a garden space with a ramp celebrating
[19:03]
the ecology of the site and enriching
[19:07]
the ecology of the site here.
[19:09]
You can see the buildings are five stories high
[19:12]
as that service level daylights get into those spaces
[19:16]
so people can also work in them.
[19:18]
It's very important to us.
[19:21]
And lastly just to touch on the other component of this which
[19:26]
is the parking structure on East Grand this is largely being kept
[19:31]
as it is as intact but the key feature of the enhancement
[19:37]
is the enhancement to the vertical circulation to enhance
[19:41]
connections between the South campus portion using express
[19:48]
elevators to take them up to that bridge level
[19:51]
so you see this kind of lantern is a signifier
[19:55]
and is representative of that vertical circulation
[19:58]
with the bridge which passes over the top of the parking
[20:02]
structure so that will be a new bridge which goes on there
[20:05]
and allows that pedestrian access for people who are
[20:08]
working in this lower campus,
[20:10]
the South campus on the left hand side up to the new center
[20:14]
to build greater collections and collaborations in the future.
[20:18]
And lastly this is a view around that central core plaza
[20:23]
a place for employees to sit at in safety unsheltered
[20:28]
from the wind.
[20:30]
I'll go to Kelly for the landscape.
[20:35]
>> Thank you.
[20:37]
Moving to the landscape of the project
[20:40]
the overall landscape concept is inspired
[20:42]
by the geology and a native plant communities of our point
[20:49]
San Bruno setting.
[20:51]
The concept is adapted to each open space responding
[20:54]
to the specific building context and the anticipated user
[20:59]
experience.
[21:00]
As this diagram denotes the landscape
[21:03]
is organized into six distinct gardens
[21:06]
named for their predominant landscape.
[21:10]
We have the bedrock garden come on the water garden come
[21:16]
with a tree garden and then the heart courtyard
[21:19]
has been mentioned.
[21:22]
The material and planting pallets
[21:26]
drive from the site's geology and native plant communities.
[21:30]
It is also informed by our prior experience of the campus.
[21:35]
The species of plants selected are well
[21:38]
suited for the dry windy conditions of Point San Bruno.
[21:42]
The material is also used texture and color
[21:46]
to further evoke the site's natural geology
[21:48]
while incorporating selected salvaged materials
[21:51]
from the existing campus.
[21:55]
Looking at the overall landscape plan
[21:58]
the surrounding landscape outside
[22:00]
of the building kind of to the south west
[22:05]
is restored as naturalized grassland using native planting
[22:12]
and reinforcing the site's natural character where
[22:15]
the program is not needed.
[22:18]
The six gardens within the building
[22:20]
create distinct amenities while sharing a common language
[22:24]
with the outer naturalized landscape.
[22:27]
And the broader campus.
[22:31]
Zooming in this plan gives us a closer view of the six landscape
[22:36]
areas and the relationships to the buildings.
[22:38]
As Ben denoted a lot of the circulation comes from the south
[22:43]
so as people come from the garage
[22:45]
we were just looking at they come through the PSA
[22:50]
connector labeled seven here with trees along the side
[22:53]
directly to the heart labeled number one
[22:56]
and when people enter at grade there is a grand stair
[23:00]
and the elevated pedestrian walk label number
[23:03]
four in the diagram which further connects
[23:05]
the site to the rest of campus.
[23:08]
Going down to that southern area with the existing parking garage
[23:13]
this area also has restored naturalized planting
[23:18]
with a few additional trees that provide shade
[23:21]
along the adjacent sidewalks.
[23:23]
Lastly there's a small zigzagging stair in the Hillside
[23:27]
which directly connects back to the elevated pedestrian walk.
[23:31]
Thank you.
[23:49]
>> So Genentech did provide a model as you see here.
[23:52]
Of the commission would like to take a couple of minutes
[23:54]
to look at that until we get into this presentation
[23:56]
we can or we can wait until after my presentation.
[24:02]
Whichever the commission would prefer.
[24:09]
Keep going?
[24:11]
Okay.
[24:20]
So getting into the entitlements required
[24:25]
to prove the proposed project in the master plan
[24:33]
all projects that come through require conditional use
[24:37]
permit design review.
[24:38]
Also asking for a tentative map approval
[24:41]
and also looking at sequence analysis.
[24:45]
The use permit and design review entitlements
[24:49]
both require that the project show consistency
[24:52]
with the General Master plan and zoning
[24:55]
so I'll start with the zoning consistency discussion.
[24:58]
At a high level the proposed center
[25:01]
is consistent with all of the development standards including
[25:04]
the floor area ratio.
[25:07]
Zoning ordinance section 20.260 of the Master Plan District
[25:15]
includes a subsection related to Transportation System
[25:19]
Management.
[25:19]
This is typically specific to transportation demand management
[25:25]
but I've also included the off street parking
[25:29]
discussion in this section as these three relate
[25:33]
with one another.
[25:35]
As you're all aware it comes before the Planning Commission
[25:39]
on an annual basis to discuss their compliance
[25:41]
with the transportation requirements
[25:44]
and they most recently came before you
[25:46]
in the spring of this year.
[25:49]
That's where their October 2025 analysis found a 60% no share
[25:57]
split inclusive rework options and with the trip cap
[26:02]
they're about a third of what the trip
[26:07]
cap would allow on site.
[26:11]
The totality of the phase one redevelopment projects
[26:15]
would decrease campus wide parking which
[26:18]
is in keeping with the goals.
[26:22]
The total amount of parking for the entire campus
[26:26]
would be reduced to just over 6000 parking spaces.
[26:29]
The proposed project is in compliance with the zoning
[26:33]
ordinance requirements.
[26:35]
In terms of consistency with the master plan
[26:38]
these slides show how the project
[26:42]
meets the four main objectives.
[26:46]
This one deals with land use objectives and urban design
[26:51]
objectives and then how it is consistent with transportation
[26:55]
and infrastructure and sustainability objectives.
[27:01]
As part of the Genentech Master Plan Consistency discussion
[27:06]
staff also wanted to highlight how vehicular access
[27:09]
and circulation will be handled with the eventual closure of DNA
[27:14]
way .
[27:18]
In 2025 required the roadways highlighted in this image.
[27:22]
Has the ability to close portions of these streets
[27:26]
to through traffic.
[27:28]
Of public access is maintained and if service and fire access
[27:32]
is maintained throughout the campus the project
[27:36]
itself includes construction on the portion that
[27:39]
is colored orange in the image.
[27:45]
The site circulation image shows how the proposed project
[27:50]
will comply with the requirements
[27:51]
of their acquisition.
[27:53]
Public vehicular circulation would
[27:55]
continue on all the roadways indicated in blue
[27:58]
and then service and emergency vehicular access
[28:02]
would be accommodated by the internal road
[28:04]
network indicated in Orange.
[28:07]
The project team has worked closely
[28:09]
with the city including public works fire and police
[28:13]
to ensure that site circulation will meet all of our emergency
[28:17]
access infrastructure needs.
[28:21]
The application does include a tentative map.
[28:25]
The engineering division has reviewed the tentative map
[28:27]
and finds that it meets all necessary municipal code
[28:30]
requirements and included relevant conditions of approval
[28:33]
as part of the overall project conditions of approval.
[28:37]
From a general planning consistency standpoint
[28:40]
the General Plan Land use designation
[28:43]
for the overall campus is business technology Park
[28:47]
which allows for campus like environments
[28:50]
for corporate headquarters research and development
[28:52]
facilities and offices.
[28:55]
The general plan also includes overarching goals
[28:57]
related to South San Francisco remaining a hub of science
[29:01]
development and improving the use of one on one subarea
[29:05]
to improve connectivity for workforces
[29:08]
and to increase alternative travel modes.
[29:12]
The project is consistent with and will
[29:15]
be a focal project in meeting the general long term vision.
[29:21]
This slide shows the estimated development fees for the project
[29:27]
which total approximately 54 million
[29:30]
based on 2026 calculations.
[29:33]
Actual building permit fees will be determined when
[29:39]
Foundation permits are issued.
[29:42]
Moving to an environmental review
[29:45]
while it's the only portion of the phase one redevelopment
[29:49]
projects that is before the Planning
[29:51]
Commission for entitlements tonight
[29:54]
the California Environmental Quality Act
[29:56]
requires analysis of the whole of the action which
[29:59]
means all of the individual parts of an activity.
[30:02]
Based on this consistency analysis evaluated
[30:07]
each of the phase one redevelopment projects
[30:10]
individually and collectively under one document
[30:12]
and so that includes all of the buildings
[30:16]
or parts of the project that are identified
[30:18]
in green on this slide.
[30:20]
In 2020 the City Council certified
[30:25]
an environmental impact report or EIR
[30:28]
for the Genentech Master Plan.
[30:31]
The 2020 Master Plan EIR evaluated the potential impacts
[30:35]
of the proposed growth and additional employees identified
[30:39]
in the 2020 Master Plan for Genentech.
[30:42]
Subsequently in 2022 the City Council
[30:47]
certified for the 2040 General Plan Update Zoning Code
[30:52]
Amendments and Climate Action Plan.
[30:54]
The General Plan EIR evaluated potential impacts
[30:58]
and additional growth envisioned in the General Plan update.
[31:02]
Together we refer to those two as the prior EIR.
[31:08]
The guidelines allow cities to consider
[31:10]
whether projects potential environmental effects
[31:13]
have already been evaluated and disclosed in the prior EIR
[31:17]
and whether additional environmental review is
[31:20]
necessary.
[31:21]
To determine this a consistency checklist and addendum
[31:26]
was prepared.
[31:30]
The consistency checklist assign each of the projects
[31:36]
and came to the following primary conclusions.
[31:38]
The phase one redevelopment projects
[31:41]
do not trigger any of the conditions
[31:43]
under section 15162 that would require
[31:47]
a subsequent or supplemental EIR.
[31:50]
The project's environmental effects fall within the scope of
[31:56]
and are consistent with what was already evaluated in the prior.
[32:04]
The projects match the density and land use assumptions
[32:07]
in the General Plan and the Campus Master Plan
[32:11]
and there are no new significant on site
[32:14]
off site or cumulative impacts beyond what the prior is already
[32:20]
examined and then for the new transmission
[32:24]
line that will connect to the electrical substation
[32:29]
the proposed changes are minor enough that an addendum rather
[32:32]
than a subsequent is appropriate under section 15164.
[32:38]
Based on these findings staff concludes
[32:42]
that the checklist and addendum to the prior
[32:46]
is the appropriate documentation for the phase one redevelopment
[32:52]
project.
[32:54]
So coming to the last portion the reimagining
[33:00]
of the overall campus is a significant investment
[33:04]
that allows them to continue as a primary hub for the industry
[33:09]
within South San Francisco and furthers
[33:11]
the city's goals related to connectivity, innovation,
[33:14]
and sustainability.
[33:16]
So based on the findings and conditions of approval
[33:20]
contained in the Associated resolutions staff
[33:24]
recommends the Planning Commission
[33:25]
take the following two actions.
[33:27]
First that you move to adopt the resolution making
[33:31]
a determination that the project is within the scope of the phase
[33:34]
one redevelopment projects the checklist
[33:38]
and addendum and second move to adopt the resolution approving
[33:42]
the entitlements request and including the errata
[33:46]
which you have a copy of in front of you
[33:48]
which changes the conditions of approval specifically
[33:54]
engineering condition of approval number 47
[33:57]
so the last sentence reads the city will
[33:59]
be responsible for implementing the construction of the city
[34:03]
capital improvements of the sanitary sewer mains
[34:06]
identified in condition of approval 45.
[34:09]
The original conditions incorrectly
[34:12]
stated condition of approval 44.
[34:16]
The last thing I will state is that the Planning Commission
[34:22]
also received comment letters from the following groups
[34:28]
from the San Mateo Labor Council the building
[34:32]
and Construction Trades Council, Bay Area Council Congressman
[34:37]
Kevin Mullin, California life Sciences, chamber
[34:40]
of San Mateo County, North coast state carpenters Union
[34:44]
and the South San Francisco Chamber of Commerce.
[34:47]
All of those comments in support of the proposed project.
[34:52]
With that that ends the staff presentation.
[34:55]
Both staff and the team are happy to answer any questions.
[35:01]
I will turn it over to the commission.
[35:06]
>> Do any of the commissioners want to take a moment to see --
[35:11]
or should we jump in?
[35:14]
Okay.
[35:17]
All right.
[35:18]
Do commissioners have questions for staff or applicant?
[35:26]
>> I've got two major questions the first of which can probably
[35:29]
be disposed of pretty promptly.
[35:30]
We did see a circulation map and the main vehicle quarters that
[35:39]
were fire and service roads.
[35:43]
My question is we have some five story buildings going in that
[35:48]
are away from main roads and when there is an incident
[35:52]
the fire department will need to bring in --
[35:56]
may need to bring in a large ladder truck.
[35:59]
I was just wondering if those roads can accommodate a larger
[36:03]
ladder truck and the service roads can accommodate -- >> Yes.
[36:08]
I do know that the team met directly with the fire Marshal
[36:14]
to discuss how all of the service roads
[36:18]
would work throughout the site.
[36:21]
I actually should look to see.
[36:23]
The fire Marshal is not here.
[36:25]
And all of the service roads are designed
[36:29]
to meet the fire department's needs for access
[36:32]
to those buildings.
[36:34]
If the team wants to talk any more about that but generally
[36:38]
yes it would meet fire department guidelines.
[36:42]
>> I just needed for the record that it was checked.
[36:46]
The second is we saw some slides that outlined
[36:48]
some significant leveling of the campus
[36:52]
and that brings basically three interrelated questions here.
[36:59]
One confirming that this amount of leveling
[37:01]
does not trigger anything additionally
[37:04]
environmentally in terms of similar
[37:07]
that's not already accounted for that we're in these resolutions.
[37:16]
Two what is going to be done with the removed material
[37:21]
and three as with many things in Oyster Point
[37:27]
we have a history of shipyard and stockyards
[37:32]
potentially you may find some older materials that
[37:36]
may be contaminated.
[37:38]
Are we anticipating any environmental hazards
[37:41]
or concerns from the removed materials?
[37:51]
>> I will start an answer and then turn it over to the project
[37:53]
team.
[37:54]
I do know that the analysis did not
[37:58]
find there was anything significant
[38:01]
from the preliminary analysis that was completed.
[38:06]
We do have Scott Gregory who prepared the documents
[38:12]
and might be able to talk a little more about that
[38:14]
and then I will pass over the material questions.
[38:33]
>> I am an environmental consultant .
[38:38]
To address your questions about environmental implications
[38:40]
to the extent of grading on the site I do
[38:43]
think that the document which is called a checklist
[38:47]
and supposed to be abbreviated but it's quite a thick document
[38:51]
has done a very thorough documentation
[38:53]
of the extent of grading that would occur
[38:56]
on the site, the geotechnical constraints in how those are
[39:00]
overcome through the retaining wall systems
[39:02]
and how those systems are designed
[39:05]
to protect geotechnical issues landslides and slopes
[39:09]
and buildings etc.
[39:10]
So I think the full extent of environmental implications
[39:13]
of the hydrological geological biological to the extent
[39:18]
of grading that would occur on the site was fully addressed
[39:22]
and not found to be a new significant effect.
[39:24]
In terms of where the soil would go
[39:28]
the checklist has identified a couple of different options.
[39:31]
One of those is to create a soil storage location
[39:34]
within the campus where soil over time
[39:38]
there's going to be a lot of movement
[39:39]
and some needs to get cut and filled so one option is to store
[39:43]
a component of that soil temporarily so it can be cut
[39:49]
from one location and stored for a while
[39:51]
and moved back to a new location as filled so that's one option.
[39:55]
We also studied one option where all of that soil
[39:58]
would be essentially exported from the site.
[40:01]
We looked at the air quality emissions
[40:03]
from the trucks that would occur from that process
[40:06]
and found that would not result in new or more severe
[40:10]
significant environmental air quality effects.
[40:12]
And then your other concern was about --
[40:17]
>> I don't expect many -- there wasn't a lot of preindustrial
[40:22]
workup but just wondering if there is any worries
[40:27]
or potential concerns from prior uses in the areas that will be
[40:31]
excavated.
[40:33]
>> Within the location we have looked at today and within
[40:36]
the adjacent properties where two of the other projects are
[40:40]
located there have been detailed geotechnical and environmental
[40:43]
site specific studies that have identified the soils within
[40:47]
those locations.
[40:49]
Didn't find necessarily remnants of historic buildings but did
[40:54]
find things like serpentine soils
[40:55]
so there will be a process as those cuts are taken
[41:02]
to determine the capabilities of those soils
[41:04]
to be reused as fill versus those soils that may need
[41:07]
to be disposed of in a certain amount of that is assumed
[41:10]
to need to be disposed of including
[41:12]
those serpentine soils.
[41:15]
>> Thank you.
[41:25]
>> Any questions for commissioners?
[41:29]
>> Just more of a question on population.
[41:31]
I know you're demolishing existing buildings.
[41:37]
Is it going to merge over to the new ones?
[41:41]
It is a beautiful facility and how much impact would that be?
[41:45]
But you're tedium is very good though by the way.
[41:49]
>> That's correct.
[41:50]
These buildings are anticipated to be
[41:52]
staffed by workers who are already present on the site.
[41:55]
This is not intended to accommodate
[41:57]
some surge in employee growth.
[42:00]
It is merely to relieve pressure on existing labs that many
[42:06]
of which date back to the early 90s and have been retrofitted
[42:10]
as many times as they possibly can but are really at the limit
[42:14]
of their capacity both in terms of the number of people
[42:18]
and scientists they can support as well as the infrastructure
[42:21]
they can support to do science in the way it's done now
[42:25]
so in short it is really to allow a more generous workspace
[42:30]
allocation to the existing population rather than
[42:34]
to accommodate growth.
[42:44]
>> Can you please educate us and the community.
[42:46]
There's a lot of talk about AI taking over and replacing
[42:51]
jobs in the city especially in the research.
[42:55]
Can you educate us on the layout of the new buildings,
[43:00]
the inside and how it's going to enhance the workforce
[43:06]
and not replacing scientists and employees on campus?
[43:13]
>> Absolutely.
[43:14]
It's a pretty exciting application
[43:16]
of artificial intelligence actually
[43:18]
and it's been fascinating for me to learn how that is manifest
[43:22]
in the workplace and in the design lab buildings.
[43:25]
It's been an interesting exercise
[43:27]
because the science and technology is changing
[43:30]
so quickly that we anticipate by the time this building delivers
[43:35]
in six plus years that way of working
[43:39]
may have changed yet again so one of the challenges that we
[43:44]
and the team have taken on is trying to design the building
[43:47]
to be as flexible as possible to imagine and allow those futures
[43:52]
but fundamentally the building is
[43:55]
designed to accommodate those changes in two major ways.
[43:59]
Number one is to allow a much greater degree of automation
[44:04]
in the labs than occurs today and this is not
[44:07]
so much about taking people out of the picture it's allowing
[44:13]
the building and the labs to be continually working even
[44:17]
at a time when the scientists may not even
[44:19]
be there themselves.
[44:21]
The scientists are there and are part of the process
[44:25]
thinking of the experience designing it and working
[44:28]
directly with their colleagues who may not be at a wet biology
[44:33]
bench but who are at the computer screen working
[44:36]
on these models helping inform what the next experiment might
[44:41]
be and then designing within much more flexible and highly
[44:45]
instrumented labs experiments to be able to be run for data to be
[44:52]
processed for then the machine learning to help analyze
[44:56]
that data and in real time be helping the scientist design
[45:01]
and choose and plan out the next experiment.
[45:05]
So rather than replacing people is it just functions
[45:10]
as an augmented employee essentially allowing the work
[45:14]
to happen much faster and in a much more flexible way so not
[45:20]
only are the buildings designed to be able to accommodate that
[45:23]
flexibility to allow for that change in technology that I
[45:28]
think we have an idea about but continue to change in the future
[45:32]
and so from an infrastructure standpoint and building layout
[45:36]
standpoint much more open utilities that can be connected
[45:40]
to and reconnected as labs need to change and also a much closer
[45:45]
integration of the bench scientists with those who are
[45:49]
working more directly on computers rather than right now
[45:53]
we have those in entirely different parts
[45:55]
of the campus.
[45:56]
This brings those data scientists closer
[46:00]
to the actual bench scientists so that collaboration happens
[46:05]
more closely in real time.
[46:11]
>> Thank you.
[46:16]
>> Thank you.
[46:19]
Can you just sort of clarify for the record
[46:25]
we are doing determination for the whole of this project that
[46:29]
is laid out in the model and looking at entitlements
[46:34]
specifically for the center but can you clarify what
[46:40]
if things were to change after we
[46:42]
do the determinations for the whole thing?
[46:52]
>> If you adopt or approve the checklist and addendum that
[46:57]
looks at the project as it's designed currently.
[47:01]
If when they bring forward the Pharmatech R&D center
[47:08]
or the logistics center if they make changes
[47:12]
to the way those buildings are designed or the way
[47:16]
they are situated then there would be another consistency
[47:21]
checklist just to look do any of those changes result
[47:27]
in new impacts or effects?
[47:31]
So every time they bring new entitlements
[47:35]
back before the Planning Commission
[47:38]
we will be answering the question of
[47:40]
is this in keeping with the environmental analysis we've
[47:43]
already done or did we need to make some small tweaks to it?
[47:47]
But we are looking at the whole of the action at the beginning
[47:52]
and if there's any tweaks that are necessary as we move forward
[47:55]
we would be able to do that at each
[47:57]
of the subsequent entitlement hearings.
[48:02]
>> I know that folks see a lot of construction and some of it
[48:05]
is moving in different paces or stalled for various reasons.
[48:08]
Can you talk about what the timing
[48:10]
is of this or if that would not be known why it would be known?
[48:17]
>> I will pass it on to the project team.
[48:25]
>> For the center specifically we anticipate the project will
[48:28]
take approximately four years to construct so that will deliver
[48:33]
we hope around the end of 2032.
[48:36]
The rest of the projects as I've mentioned
[48:40]
that's the largest it is going to take the longest to build
[48:43]
and that's why we are starting so early
[48:45]
and that's why you're seeing it first.
[48:47]
The other projects are smaller at least some of them
[48:51]
are slightly less complex and our hope and intention is
[48:55]
that the majority of them would ultimately deliver around
[49:00]
the same time.
[49:03]
There may be some variation in their
[49:05]
and we need to work through that internally
[49:09]
but within a few years the idea would be that these all
[49:12]
come together because as you can see the model and in the plans
[49:16]
it is a main component of this reimagining of the site
[49:21]
but it really works in concert with the other buildings
[49:24]
around it so in order to really achieve the desired campus
[49:28]
vision and that pedestrianized core we do need that to all
[49:33]
come together around the same time
[49:35]
so the idea is that while there may be some delay
[49:38]
some might move faster or some slightly slower ideally
[49:41]
they will all come together more or less simultaneously.
[49:52]
>> Thank you.
[49:52]
There's a lot of moving parts here
[49:53]
and a lot of things that are in the city's control
[49:56]
and some things that are outside the city's control.
[49:59]
Do you foresee any issues with some
[50:01]
of those elements that involve other jurisdictions or bodies?
[50:08]
>> I hope not.
[50:10]
We of course will engage with other agencies as required.
[50:16]
None of the projects that are part of this proposal
[50:21]
encroach into the control jurisdiction.
[50:24]
That is usually the one that can cause
[50:27]
more unpredictability and longer delays in terms of permitting.
[50:31]
Obviously everything here is high up on the hill
[50:34]
so that doesn't apply.
[50:36]
We are below the height restrictions by a wide margin.
[50:41]
These buildings are not as tall as the tallest buildings that we
[50:45]
have on the site right now on the top of the hill
[50:48]
so we don't anticipate any issues there
[50:50]
but of course we will proceed with the part
[50:56]
77 regulations as expeditiously as possible
[50:58]
and respond to any concerns they may have.
[51:02]
Other than that the project will be
[51:04]
subject to all of the standard mitigation measures identified.
[51:08]
There are some instances in which
[51:11]
engagement with other agencies might
[51:14]
be appropriate for instance if we do stumble
[51:17]
upon any toxic materials then we would have
[51:20]
to work through those proper channels
[51:21]
but we haven't identified anything else that would hold us
[51:25]
up.
[51:30]
>> The last thing I was curious about is what this does
[51:32]
of course with closing off is it consolidates the property
[51:36]
in a way that I think makes sense given the vision that is
[51:41]
described here.
[51:42]
Can you talk about what is the public's experience
[51:44]
on the outskirts of this area like for example I'm not seeing
[51:50]
walls or fences or enclosures but can you
[51:54]
help me understand what the public might experience
[51:56]
as they're moving around this large campus >> The public's
[52:03]
experience of the campus in general
[52:04]
is not likely to change all that much.
[52:07]
What we are talking about with these projects here
[52:10]
is restricted to the heart of the campus come
[52:12]
at the top of the hill is not really
[52:15]
where we see the most public engagement with our site general
[52:18]
because it is quite internal to the campus.
[52:21]
The remaining portions of the campus that this project does
[52:24]
not address will remain more or less unchanged
[52:27]
for the foreseeable future.
[52:29]
That includes all of the current access points
[52:33]
to the Bay trail along our campus shoreline.
[52:36]
There are four of them.
[52:38]
Those will remain in place.
[52:39]
Similarly as you may recall from the Purchase and sale agreement
[52:45]
that we have regarding the roadways
[52:47]
the portion of DNA way that extends from East Grand
[52:50]
up to the top of the hill will remain
[52:52]
open to the public in perpetuity so that includes access
[52:56]
to the wind harp and it will include access to the new entry
[53:01]
way or arrival building that we hope to move forward
[53:05]
with as part of this portfolio.
[53:07]
What we are hoping there is that the public experience
[53:10]
of coming to Genentech will actually be improved.
[53:13]
Part of the challenge that we experience on the site right
[53:16]
now is it is so big and so spread out
[53:19]
that you don't actually really know when you've arrived
[53:22]
and it can be hard to understand where as a visitor
[53:25]
you are expected to go and where you're welcome
[53:30]
and intended so by really consolidating the arrivals
[53:35]
experience and making a much more pronounced and legible
[53:40]
entryway to the campus we hope that that will actually improve
[53:43]
the public's experience of those who
[53:46]
come on to the heart of the site and those who are enjoying
[53:49]
the bayfront and the more peripheral areas that
[53:52]
will be largely unchanged.
[53:55]
>> Thank you.
[53:56]
Any other questions for commissioners?
[54:04]
Does any member of the public wish to address the Commission
[54:08]
on this item at this time?
[54:10]
Please fill out a speaker card and give it to the clerk.
[54:13]
>> We have no members of the public wanting to provide public
[54:16]
comments.
[54:17]
>> Thank you.
[54:18]
Then I will close the public hearing
[54:21]
and turn this over to the commission for discussion.
[54:24]
Would anyone like to make comment?
[54:33]
>> Like you said it's a beautiful project.
[54:35]
One comment I'm glad in your design
[54:38]
is it took into account the four building size and one larger
[54:43]
building.
[54:43]
The one thing I will say on behalf
[54:48]
of how the park was above I was out there working since 1980
[54:55]
and seeing How it's grown and expanded
[54:57]
and the whole bit due to the efforts
[54:59]
being the major landowner out there you've
[55:02]
always had beautiful buildings and I see no different with this
[55:06]
so I think it's just adding more to the jewel that's already
[55:09]
out there and you will have my support.
[55:24]
>> Then I will just add I appreciate the thoughtfulness
[55:27]
and the phased approach going into this.
[55:32]
And in particular seeing a number of ways
[55:38]
that this plan exceeds what is required for example the vision
[55:44]
of going completely zero carbon I think there's a number of ways
[55:51]
that this project is really looking for win win scenarios
[55:56]
for the community and the environment
[56:00]
and I appreciate the thoughtfulness to that.
[56:04]
I also appreciate the ongoing and continued investment
[56:10]
in South City and being a neighbor of South City.
[56:15]
With that can I get a motion for three a?
[56:22]
>> I can make a motion.
[56:24]
To adopt the resolution making the determination
[56:26]
that the project is within the scope of phase one redevelopment
[56:30]
project checklist and addendum.
[56:34]
>> Second.
[56:36]
>> Roll call please?
[56:59]
>> Moved to adopt the entitlements requested.
[57:05]
>> Can I ask with the included errata?
[57:07]
>> Yes thank you.
[57:09]
>> Roll call please?
[57:30]
>> Item three passes.
[57:31]
Congratulations.
[57:32]
On to administrative business.
[57:36]
Do we have anything?
[57:41]
>> We do not have any administrative business.
[57:46]
>> All right.
[57:46]
Does any commissioner have items or announcements to make?
[57:52]
Then I adjourn this meeting.