Agenda
Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
These are YouTube's auto-generated captions, not a human transcript — expect occasional errors, especially with names and technical terms.
[0:08]
All right, welcome everyone.
[0:10]
Is that okay?
[0:13]
great. Um, I am calling the
[0:16]
regular meeting of the Rosstown Council
[0:19]
Wednesday, April 29th, 2026 to order.
[0:24]
Posting of the agenda and any changes to
[0:27]
the agenda. Town Manager Johnson.
[0:30]
>> Yes. Good evening, Mayor and Council
[0:32]
members. There is one change. I'm
[0:34]
requesting uh to pull agenda item 10C to
[0:38]
remove it from the agenda this evening,
[0:41]
and we'll be bringing it back to you at
[0:43]
your meeting on June 11th. This is the
[0:46]
uh contract with Marin IT for
[0:48]
information technology services.
[0:51]
Thank you. Item number three, disclosure
[0:53]
of expart communications on items where
[0:56]
the town council acts in an adjudicatory
[0:58]
or quasi judicial capacity. Any
[1:01]
disclosures?
[1:03]
Number four, open time for public
[1:06]
expression. This is limited to three
[1:08]
minutes per speaker for items that are
[1:10]
not on our agenda tonight. Is there
[1:13]
anyone in the chamber with public
[1:15]
comment? Yes. Step forward and use the
[1:18]
microphone and introduce yourself,
[1:20]
please.
[1:26]
Hi. Um Diane Rudden, I just wanted to
[1:29]
say
[1:31]
more.
[1:32]
>> Okay. Sorry. Um that today I went down
[1:36]
and went in Balloon Delights and was
[1:38]
once again delighted. Um I didn't
[1:41]
realize they started here in 1981
[1:45]
and then moved to their other location
[1:47]
for 40 years. So, I had heard some
[1:50]
negative things about them, but I think
[1:52]
it's wonderful to have a little
[1:54]
something in downtown Ross. So,
[1:58]
>> thank you.
[2:00]
>> Good evening. My name is Randy Dvodto.
[2:03]
I'm a longtime Kentfield resident and
[2:06]
member of St. Anselms Parish at 97 Shady
[2:10]
Lane in Ross. and I was asked to come
[2:13]
down tonight to simply inform the
[2:14]
council that our restoration of our bell
[2:17]
tower project construction has started.
[2:20]
Uh Cahill is our contractor. It will run
[2:23]
through the middle of November. It
[2:25]
involves replacement of the foundation,
[2:27]
the siding, the weather proofing, the
[2:29]
flashing and the roofing as well as
[2:32]
repairing leaking windows. and we've
[2:34]
made provisions for alternate parking,
[2:37]
noise compliance, and um and um
[2:41]
participation with all of the ROS
[2:43]
requirements for construction.
[2:45]
>> Thank you for sharing that.
[2:46]
>> You're welcome.
[2:49]
>> Anybody else in the chamber? Anyone
[2:52]
online for public comment?
[2:58]
No hands online. Mayor
[3:03]
Number five, presentation of
[3:06]
proclamation for retiring police chief
[3:09]
Rafllo Pada. Where are you, Chief Pota?
[3:12]
There you are.
[3:15]
I I want you up here.
[3:17]
>> Yes,
[3:21]
» Sid. If you want to come up too, you
[3:23]
may.
[3:26]
Okay.
[3:29]
So I am going to read a proclamation
[3:32]
honoring Chief Rafllo Pa upon his
[3:34]
retirement from the town of Ross,
[3:36]
California. Whereas Chief Rafllo Pa has
[3:40]
dedicated more than 42 years to public
[3:42]
safety, beginning his career as a fire
[3:45]
dispatcher and EMT in Marin County
[3:47]
before attending the police academy and
[3:49]
joining the Sanfell Police Department.
[3:52]
And whereas Chief Pota distinguished
[3:54]
himself over a remarkable career at the
[3:57]
Sanfell Police Department, rising from
[3:59]
patrol officer to lieutenant and serving
[4:02]
in roles including major crimes task
[4:04]
force detective, forensic artist,
[4:07]
hostage negotiation team commander, and
[4:10]
graduate of the FBI National Academy.
[4:13]
And whereas Chief Pada contributed to
[4:15]
landmark cases in Marin County,
[4:17]
including the first Marin County DNA
[4:20]
prosecution and assisted on the
[4:22]
investigation of
[4:24]
Exana Fairchild and Polyclass as a
[4:28]
forensic artist. And whereas following
[4:31]
his retirement from the San Rafale
[4:33]
Police Department in 2018, Chief Pota
[4:35]
continued serving the public as an
[4:37]
investigator for the Marin County
[4:39]
District Attorney's Office before being
[4:41]
appointed chief of the town of Ross
[4:44]
Police Department in 2021. Whereas, as
[4:47]
chief of police, Chief Pa provided
[4:49]
strong leadership to his team,
[4:51]
overseeing training and equipment
[4:53]
upgrades and hiring four officers to
[4:55]
ensure the long-term strength of the of
[4:57]
the department. And whereas Chief Pa
[5:00]
built meaningful connections with Ross
[5:02]
residents and the Ross school and was a
[5:04]
familiar and beloved presence at
[5:06]
community events including the Fourth of
[5:08]
July celebration, Halloween, Spring
[5:11]
Fling, and Live on the Common. And
[5:14]
whereas it is most fitting that the town
[5:15]
of Ross recognized Chief Pota's
[5:17]
extraordinary contributions and wish him
[5:20]
well in retirement. Now therefore, on
[5:23]
behalf of the town of Ross and the Ross
[5:25]
town council, I do by I do hereby honor
[5:28]
Chief Rafel Pota for his lifetime of
[5:31]
dedicated public service, his steadfast
[5:34]
leadership of the Ross Police
[5:36]
Department, and his genuine commitment
[5:38]
to making Ross a safe and welcoming
[5:40]
community for all who live here and
[5:42]
visit. Thank you.
[5:44]
>> Thank you.
[5:58]
if you'd like to say a few words. I know
[6:00]
we're having a party tomorrow from 9 to
[6:02]
10:30 at Marin Art and Garden, but if
[6:04]
you'd like to say a few words,
[6:05]
>> just just a couple things. First of all,
[6:07]
none of it possible without my wife Sid.
[6:10]
None of it possible without the team
[6:12]
here uh at the Ross Police Department,
[6:15]
the officers in the back of the room
[6:17]
here, and of course, absolutely none of
[6:19]
it possible without the town manager
[6:21]
support and your support. Um I didn't I
[6:24]
didn't do any of this stuff by myself.
[6:26]
You guys made it possible for me. So,
[6:29]
thank you so much. And then we'll talk
[6:30]
some more tomorrow.
[7:07]
Next is number six, the swearing in and
[7:09]
badge pinning of our new town of Ross
[7:11]
police chief, Raul Aguilar.
[7:14]
Chief Aguilar, where are you? There you
[7:16]
are. Come up, please.
[7:34]
Fantastic.
[7:37]
Good afternoon.
[7:38]
I Daryl Aguular
[7:40]
>> I Raul Aguar
[7:41]
>> do solemnly affirm that I will
[7:44]
>> do solemnly as affirm that I will
[7:46]
support
[7:47]
>> and defend the Constitution of the
[7:48]
United States
[7:49]
>> and defend the Constitution of the
[7:51]
United States
[7:52]
>> and the State of Cal
[7:53]
>> and the State of California
[7:55]
>> against all enemies foreign and domestic
[8:01]
that will that I will bear true faith
[8:03]
>> allegiance to the Constitution
[8:06]
>> and allegiance to the Constitution of
[8:07]
the United States
[8:09]
>> in the Constitution State of California
[8:11]
>> and the Constitution of the State of
[8:12]
California.
[8:13]
>> I take this obligation
[8:15]
>> that I take this obligation freely
[8:17]
>> without any mental reservation
[8:22]
>> or purpose of evasion
[8:24]
>> well and faithfully
[8:25]
>> that I will that I will well and
[8:27]
faithfully
[8:28]
>> discharge the duties upon which I am
[8:30]
about to enter.
[8:31]
>> discharge the duties upon which I'm
[8:33]
about to enter.
[8:35]
>> Thank you very much.
[8:50]
Welcome, Chief. We're so happy to have
[8:52]
you. If you want to say a few words, you
[8:54]
can.
[8:55]
>> Thank you very much. Um, I will keep it
[8:57]
brief. First of all, I want to thank um
[9:01]
the um town manager for um giving me uh
[9:05]
the trust to take on this endeavor. And
[9:07]
I also want to thank the members of the
[9:09]
council who have allowed me to uh you
[9:12]
know take this endeavor and follow in
[9:14]
the footsteps of Chief Pa who um I I'll
[9:18]
be honest, I think I'm definitely um you
[9:21]
know, it's a a big task, but I think I'm
[9:23]
ready to do it. Uh, and also I want to
[9:26]
thank especially Chief Pa for um, you
[9:29]
know, training me and guiding me along
[9:31]
the way. And there's also some other
[9:33]
mentors in the room that I definitely
[9:35]
want to mention. Um, Harry Barbier who
[9:38]
was one of my original training officers
[9:41]
back in 1999. Uh, and Chief Spieler who
[9:45]
was one of my mentors uh, on my final
[9:47]
years in San Rafale. So thank you very
[9:50]
much for uh, being here. Um I mean
[9:52]
there's so many of you here that I can't
[9:54]
really um thank everybody but if I may
[9:57]
just a couple more minutes uh I'm happy
[9:59]
to introduce uh excuse me I just want to
[10:02]
u recognize a couple people that are
[10:04]
here in the room with me. Uh my son uh
[10:06]
Captain Aguilar from the US Army. He can
[10:14]
he he had two deployments to the Middle
[10:16]
East uh a few years back. and also uh my
[10:19]
mom and my dad, Hovita and Raul. Uh and I also like to um you know, finally,
[10:33]
last but not least, my partner, the
[10:36]
person that I uh dream about all the
[10:38]
time, and I um you know, I'm getting a
[10:40]
little choked up, but uh Olivia, who is
[10:43]
my um my best friend,
[11:28]
Got it. Awesome. Thank you.
[11:40]
» Thank you very much.
[11:49]
» Item number seven is the mayor's report.
[11:53]
May is wildfire preparedness month. Fire
[11:56]
experts are concerned about March's
[11:58]
record-breaking heat that dried out fuel
[12:01]
months ahead of schedule in Marin and
[12:02]
across the western US. On March 20th,
[12:05]
Sanfell's temperature reached 92 degrees
[12:08]
Fahrenheit, shattering the previous
[12:10]
82°ree record in 1960. Thankfully, we
[12:13]
have received more rain in April, but
[12:15]
our extremely early and severe heat wave
[12:18]
means we need to continue to be prepared
[12:20]
for wildfires. Here are four easy steps.
[12:24]
Number one, Alert Marin. Is your
[12:26]
household signed up? Alert Marin
[12:28]
notifies residents during emergencies
[12:30]
like wildfires, flooding, or evacuations
[12:33]
with timely, clear, and accurate
[12:35]
information on what to do and where to
[12:37]
go. But more than more than 40% of Ross
[12:42]
households are not signed up for Alert
[12:44]
Marin. It only takes a couple of minutes. And
[12:52]
in my mayor's report, I have the website
[12:54]
to sign up. Number two, the Chipper Day
[12:58]
program for Marin Wildfire is now open
[13:00]
through November with free curbside
[13:02]
pickup and disposal of your yard's
[13:04]
excess vegetation. Take advantage of
[13:06]
this popular service by registering
[13:09]
online. Number three, Marin Community's
[13:12]
wildfire protection plan, C Community
[13:15]
Protection, Community Wildfire
[13:18]
Protection Plan, CWPP, will be presented
[13:21]
to the public at a free wildfire
[13:23]
preparedness forum this coming Saturday,
[13:26]
May 2nd, 9:30 a.m. to noon at the
[13:28]
Embassy Suites in San Rafale. Please
[13:31]
join Marin Wildfire, wildfire safety
[13:33]
leaders, local fire agencies, and
[13:35]
community partners to learn how Marin is
[13:37]
safer. And there's an online address
[13:40]
that you can go and learn more about.
[13:43]
Defensible space home inspections free
[13:45]
from marin wildfire are done every other
[13:47]
year in Ross. This year the inspections
[13:50]
will be done in Winship in the Winship
[13:52]
Park neighborhood. Dates will be coming
[13:54]
soon. Please walk with your inspector to
[13:56]
learn more and then open your report and
[13:58]
follow the recommended steps to prepare
[14:00]
your home and garden. If your home was
[14:02]
inspected last year, please continue to
[14:05]
address the issues that are identified
[14:07]
in your report.
[14:09]
Marin Master Gardener resources shared
[14:11]
with age friendly roughs. I became a
[14:14]
Marin Master Gardener in 2016 after 50
[14:18]
hours of training over a five-month
[14:20]
period and passing a final exam. This
[14:23]
year, Marin Master Gardener celebrates
[14:25]
its 40th anniversary, growing from eight
[14:28]
Marin Master Gardeners in 1986 to more
[14:31]
than 350 today. Each year, Marin Master
[14:34]
Gardeners provides more than $1.6
[14:37]
million in economic value to Marin
[14:40]
County through our voluntary services.
[14:42]
Earlier this month, I got to speak at
[14:44]
the age friendly Ross meeting, sharing
[14:47]
many of the free resources Marin Master
[14:50]
Gardeners offers to Marin Home
[14:51]
Gardeners. Please take advantage of
[14:54]
these by accessing them on the age
[14:56]
friendly Ross website. We've already
[14:58]
heard about the St. Anselm rebuild of
[15:01]
its bell tower. So, finally, the
[15:03]
citizens advisory committee presents
[15:05]
recommendations on town facilities.
[15:08]
Tonight, the council will receive the
[15:10]
committee's recommendations on our
[15:11]
nearly 100-year-old town facilities. We
[15:14]
thank the eight dedicated and talented
[15:16]
members for working nearly non-stop
[15:19]
since midFebruary to help address these
[15:21]
complex issues. Jeff Cune, Dan Weiny,
[15:24]
Bob Herps, Ed Dong, Bill Poland, Jeff
[15:27]
Kovick, Tom Gaffne, and Joey Buckingham.
[15:30]
And they're all here tonight. And thank
[15:32]
you so much for all your work.
[15:41]
I am hopeful that the committee's close
[15:43]
collaboration and stunning vision will
[15:45]
allow the town to turn the corner on
[15:48]
these issues and bring residents
[15:50]
together in support of our community,
[15:53]
town staff,
[15:56]
Ross police, and the Ross Valley
[15:58]
paramedics.
[15:59]
Thank you.
[16:02]
Next is council committee and liaison
[16:05]
reports. any reports?
[16:08]
>> So, the um the Ross Valley Paramedic
[16:11]
Board met and um as you know, the the
[16:15]
board has been looking into um making
[16:18]
writing up guidelines with the help of
[16:21]
their lawyer um Ben's wife uh to um
[16:27]
establish uh procedures for how the the
[16:29]
JPA works. The current guidelines date
[16:33]
from 40 years ago and consist of only
[16:35]
two pages and are very sketchy. Um the
[16:39]
proposed guidelines will be brought to
[16:41]
each council uh for consideration and
[16:44]
approval. uh one is since there are a
[16:48]
number of different uh elements um uh if
[16:52]
you I suppose the most important are the
[16:55]
process of amending the agreement and
[16:57]
the process of terminating the agreement
[16:59]
because this is a contract between eight
[17:02]
entities you know agencies um those have
[17:06]
to be unanimous decisions but the count
[17:09]
the board itself can decide whether a
[17:13]
vote to discuss an amendment with the
[17:15]
agencies can be a threequarters vote or
[17:18]
a twothirds vote of the board or a
[17:20]
unanimous vote. And when it comes to our
[17:23]
uh council to discuss um that's one of
[17:26]
the things that I'll suggest we take a
[17:27]
look at. Um for example, it should if if
[17:32]
a majority of the council wants to
[17:34]
consider an amen majority of the board
[17:36]
wants to consider an amendment, is that
[17:38]
enough for it to go out to the agency so
[17:40]
that each agency discusses it? Um so
[17:43]
that will be probably at our next
[17:44]
meeting because they're hoping to have
[17:46]
this done um uh fairly soon. Uh, one
[17:50]
thing that was not discussed was uh the
[17:53]
lease and just at you know an hour ago
[17:57]
there was um information in our uh
[17:59]
packet online that said that the Ross
[18:03]
Valley Paramedic Authority president is
[18:06]
either opposed or concerned about the plan that we are about to hear from
[18:13]
the um citizens advisory committee. Uh,
[18:16]
and in his email to Julie, he cited a
[18:20]
number of reasons why he thinks that
[18:22]
plan does not fit with the lease that
[18:24]
was agreed to. Again, this was not has
[18:27]
not been discussed at the paramedic
[18:29]
authority. And this letter is from a
[18:32]
single board member who may or may not
[18:35]
have discussed it with his agency,
[18:36]
Sleepy Hollow, but it hasn't been
[18:38]
discussed with the board or with the
[18:41]
board's agencies. So, I just wanted to
[18:43]
mention that that though there's that
[18:45]
letter in that was just added to the
[18:47]
packet that was not a topic at the most
[18:49]
recent paramedic authority meeting.
[18:53]
>> Anybody else?
[18:56]
>> Matt. So I serve as an alternate for
[18:58]
Marin Clean Energy MCE and I don't know
[19:00]
if Bill has any comments but I wanted to
[19:03]
share that there's been s you know
[19:06]
serious problems at MCE that have been
[19:08]
covered in the Marin J thankfully and
[19:11]
the latest is a misappropriation of
[19:13]
$60,000
[19:15]
of MCE's funds into the CEO's personal
[19:19]
salary from 2024 that was discovered.
[19:23]
So, I just wanted to make sure that the
[19:25]
council's aware of of the that the
[19:27]
problems continue at MCE. They they have
[19:30]
not been abated and um I think we should
[19:32]
all be, you know, we're part of this JPA
[19:35]
and all of our towns people are opted in
[19:38]
automatically. So, we should just keep
[19:40]
apprised of of the issues there and
[19:42]
hopefully uh obviously Bill's
[19:44]
representing us, but the the reforms
[19:46]
hopefully will be coming. and if he has
[19:48]
anything to add as well.
[19:56]
I This is an issue that um is one that
[20:01]
um
[20:04]
I I I'm sorry I I can't really I can't
[20:06]
really go into it because I can't
[20:08]
divulge certain information that at this
[20:12]
point is confidential but will probably
[20:14]
become public. But I think we can verify
[20:17]
that this amount of money went into
[20:20]
it was it was for a a pension
[20:22]
contribution, wasn't it? No, I'm sorry.
[20:24]
It wasn't the pension contribution. It
[20:26]
was it was something else and uh
[20:29]
something was not correctly calculated.
[20:32]
Exactly. Who was uh responsible for
[20:34]
that? I think it remains to be
[20:36]
determined.
[20:40]
I just wanted to share that on Sunday at
[20:43]
the Marin Civic Center, I attended the
[20:47]
youth town hall and participated as a
[20:50]
panel with the 10 other mayors from
[20:55]
Marin County. Um, and it was very
[20:58]
enlightening. um partly because the
[21:02]
students asked us lots of detailed,
[21:05]
thoughtful, forward-looking questions.
[21:08]
And it was also really illuminating to
[21:11]
hear from each of the other mayors their
[21:14]
background and their passion and why
[21:17]
they are serving um their towns. So, I'm
[21:21]
going to pass around a little thank you
[21:22]
note that they gave me. I also got a
[21:24]
brownie, but I ate it.
[21:27]
All right. Staff and community reports.
[21:31]
Um, anyone here from RPOA?
[21:33]
Mr. Cooblick.
[21:41]
» Yes. Uh, I'm Jeff Cooblick. I'm the
[21:43]
president of the Ross Property Owners
[21:45]
Association. And first of all, would
[21:48]
like to thank the town council and our
[21:50]
town manager, Christa, and all of you
[21:52]
who are members who have contributed to
[21:55]
the RPOA. Without your funding, we
[21:58]
wouldn't in support uh we wouldn't be
[22:00]
able to do the activities that we do. Uh
[22:04]
quick recap, we had a terrific uh spring
[22:07]
fling at the Ross School uh just a few
[22:10]
weeks ago. About 300 people attended.
[22:13]
They had an Easter egg hunt and they had
[22:15]
lots of jumpy toys and the kids all had
[22:18]
a lot of fun. So, we were happy to help
[22:21]
sponsor that through the Ross Auxiliary.
[22:23]
Uh some of you may have attended the
[22:25]
live on the commons which was uh very
[22:29]
well attended almost 2,000 people and we
[22:32]
want to thank the town for your support
[22:34]
on that project. It was a little bit
[22:36]
more than we expected. We're going to
[22:38]
try and tone it down in the future in
[22:39]
terms of our promotion so we don't have
[22:42]
quite as many people so it's not a issue
[22:44]
for the town. Um our biggest project
[22:47]
right now is we're replacing the
[22:50]
50-year-old fluorescent lights in the
[22:53]
post office and with some beautiful
[22:56]
hanging antique pendant lights uh to try
[22:59]
and match some of the other town
[23:01]
historic town properties and I think
[23:04]
you'll see a huge improvement in that.
[23:05]
We have the the pendant lights in. They
[23:07]
cost $1,200 each. Uh they're really
[23:10]
beautiful. And uh we've got the
[23:12]
electricians lined up with Richard's
[23:14]
help and Anony's help. And we uh we're
[23:18]
just waiting for some other parts. And
[23:20]
you should see some activity there in
[23:22]
the next certainly next few weeks, next
[23:24]
month. So that's about the update for
[23:27]
now.
[23:28]
>> Thank you, Jeff.
[23:30]
T Manager Johnson.
[23:32]
Yes. Thank you, Mayor. Um we are
[23:35]
starting to see uh the impact of the of
[23:38]
the war um with higher oil prices are um
[23:42]
negatively impacting bids on recent
[23:45]
paving projects. We're also spending
[23:48]
more on gas for police patrol cars and
[23:51]
the Ross Valley Fire Department is
[23:53]
spending more to fuel its engines. Um
[23:56]
but in more positive news, um staff
[23:59]
learned that after a few days related to
[24:02]
birds that the new pedestrian bridges in
[24:06]
Natalie Coffen Green Park should be
[24:07]
installed by summertime. So that'll be,
[24:10]
I'm sure, well received by folks that
[24:12]
use them and um a lot of our our um
[24:16]
recreation programs that that utilize
[24:18]
that area. The Sir Francis Drake paving
[24:21]
project between Bolinus Avenue and El
[24:23]
Camino Bueno is scheduled to start after
[24:26]
Ross School gets out for the summer and
[24:29]
it will require one lane traffic control
[24:32]
for approximately two weeks. So, please
[24:36]
mark your calendars and plan
[24:38]
accordingly,
[24:40]
maybe to be out of town.
[24:42]
Um, I'm happy to report that our new
[24:45]
building inspector 2, Matt Taya, starts
[24:48]
on May 18th. It's taken a full year to
[24:52]
recruit for that position. So, we're
[24:53]
really excited to uh welcome him um onto
[24:57]
the team. Uh the Marin County Flood
[25:00]
Control District is holding two upcoming
[25:02]
community meetings to discuss the future
[25:04]
of flood control efforts in Ross Valley
[25:07]
along the Cord Madera Creek. The first
[25:09]
will be held on Thursday, May 7th, 6:30
[25:12]
p.m. to 8:30 p p.m. at Marin Catholic.
[25:16]
And on Wednesday, May 20th, same time,
[25:19]
6:30 p.m. to 8:30 p.m., it will be held
[25:22]
here at Magic. And finally, I'd like to
[25:25]
say that it has been a pleasure to work
[25:27]
with our talented Chief Pota over these
[25:29]
past 4 and a half years. in behalf of
[25:32]
the entire town uh staff team, you will
[25:35]
be missed and we wish you the very best
[25:37]
in your well-deserved retirement.
[25:42]
Thank you. Number 10, consent agenda,
[25:46]
which is um we have removed item C from
[25:48]
the consent agenda. So, it's A, B, D, E,
[25:51]
F, G. Um does any member of the public
[25:55]
wish to remove an item from the consent
[25:58]
agenda?
[26:00]
Anybody online?
[26:02]
>> No one online. Mayor,
[26:04]
>> any council member? Matt,
[26:06]
>> I'd like to remove 10G.
[26:07]
>> 10G, which is the fiscal year 2526,
[26:12]
third quarter, 9month financial summary
[26:15]
report. Okay. Um, could I please have a
[26:18]
motion to approve consent agenda items
[26:20]
A, B, D, E, and F?
[26:25]
>> So moved.
[26:28]
>> Second.
[26:34]
Council member Dalling,
[26:36]
>> yes.
[26:37]
>> Council member Kercher,
[26:39]
>> I.
[26:40]
>> Council member Salter,
[26:41]
>> I.
[26:42]
>> Mayor Prom Robbins,
[26:44]
>> I.
[26:44]
>> Mayor McKelen,
[26:46]
>> yes. Thank you.
[26:47]
>> Motion passes unanimously.
[26:49]
>> Thank you. Um, Matt, you ped item 10g.
[26:58]
» Sorry. I don't know if you want to
[26:59]
present anything from the quarter. Um I for for me I I I I I just want to
[27:05]
point out that we have yet again almost
[27:08]
a million dollar positive variance. So I
[27:12]
believe last year we ended the year with
[27:14]
1.4 million surplus. Right now as of
[27:17]
nine months into this next fiscal year
[27:19]
it's almost a million dollar surplus. So
[27:22]
I I read the caveats. I know that those
[27:24]
variances are moved from time to time,
[27:27]
but I I just I think it's important we
[27:29]
let the town know number one that you're
[27:32]
doing an excellent job managing the
[27:34]
budget and that we consistently are in
[27:37]
surplus since I've been on this council
[27:39]
and I'm sure the longer tenur council
[27:41]
members can. But when we talk about
[27:44]
costs and and budgets, etc., It's nice
[27:46]
to see that the actual performance as we
[27:48]
review it is showing very positive
[27:50]
surpluses of substantial amounts.
[27:57]
» Christa, do you want to make any
[27:58]
comments or no?
[27:59]
>> No.
[28:00]
>> Thank you for your kind words.
[28:02]
>> Yeah.
[28:03]
>> Any discussion? Any public comment on
[28:06]
this item?
[28:07]
>> Just just one from from the the
[28:09]
discussion point of view for us. I think
[28:12]
what we should try to I know we we're
[28:14]
trying to meet as a finance committee
[28:15]
but review this in the audit just as a
[28:17]
normal part of before it has to get to
[28:20]
the council and I see a lot of times we
[28:22]
put these items on consent but they're
[28:24]
very important. I think they're one of
[28:25]
the most important things we review is
[28:27]
the financials. I think we're so
[28:29]
fortunate because we're always in
[28:31]
surplus and doing so well, but we should
[28:33]
try to for me I think it'd be nice not
[28:35]
to be on consent and spend a little time
[28:37]
talking about the financial picture
[28:39]
outside of just the budget workshop.
[28:41]
Thanks.
[28:44]
>> Any online public comment?
[28:47]
>> No raised hands, mayor.
[28:48]
>> Okay. So, we'll bring it back and any
[28:51]
further discussion.
[28:53]
Could we please have a motion to approve
[28:55]
item 10G?
[28:58]
So moved.
[29:00]
>> I'll second.
[29:04]
» Council member Dalling.
[29:06]
>> Yes.
[29:07]
>> Council member Kercher.
[29:08]
>> I.
[29:09]
>> Council member Salter.
[29:10]
>> I.
[29:11]
>> Mayor Prom Robbins.
[29:13]
>> I.
[29:14]
>> Mayor McKelen.
[29:14]
>> Yes.
[29:16]
>> Passes 50.
[29:17]
>> Thank you. That's the end of the consent
[29:19]
agenda. So now we're moving on to public
[29:22]
hearing on planning projects part one.
[29:27]
A is the town council to consider 12
[29:29]
Garden Road demolition permit and
[29:31]
adoption of resolution number 2621
[29:35]
approving the project subject to
[29:37]
conditions. Robera,
[29:39]
>> good evening mayor and council members.
[29:42]
So this item
[29:47]
» Oh, are you gonna
[29:48]
>> I have to recuse myself from this item
[29:51]
because I'm within the 500 ft of the
[29:54]
project.
[29:57]
Thank you, Council Member Selter.
[30:07]
Okay. Good evening, Mayor and Council
[30:08]
members. This item is a request for
[30:11]
approval of an afterthe-ffect demolition
[30:14]
permit at 12 Garden. On February 10th,
[30:18]
2026, town staff issued a stop work
[30:21]
order upon discovery that the existing
[30:23]
single family residence had been
[30:26]
demolished. This did happen because the
[30:29]
contractor found extensive uh wood rot
[30:32]
on the structure. Um on April 4th, 2024,
[30:37]
so about two years ago, the council did
[30:39]
approve a project for this residence. It
[30:42]
was a remodel and expansion of the
[30:44]
existing single family residence,
[30:47]
including a second story addition and an
[30:50]
attached rent restricted ADU. There are
[30:53]
no changes to the previously approved
[30:56]
project. Um, and this is before you
[30:59]
tonight because the demolition permit
[31:02]
wasn't requested or approved in 2024.
[31:06]
And based on the zoning code, um, a
[31:09]
demolition permit is required
[31:12]
to be approved by the Ross Town Council
[31:16]
for the demolition of any dwelling in
[31:19]
the town. So tonight, the action before
[31:21]
the council is to consider approval of
[31:24]
the demolition permit subject to
[31:26]
findings and conditions as outlined in
[31:29]
your resolution. staff is available to
[31:32]
answer any questions and the applicant
[31:34]
is also present as well for any
[31:36]
questions. Thank you.
[31:39]
>> Question
[32:06]
I move we approve resolution 2621.
[32:11]
>> Second.
[32:16]
» Council member Deli.
[32:17]
>> Yes.
[32:18]
>> Council member Kercher.
[32:19]
>> Hi.
[32:20]
>> Council member Robin or Mayor Sam
[32:22]
Robbins.
[32:24]
>> Yes.
[32:25]
>> Mayor McKillen.
[32:26]
Motion passes 401.
[32:40]
Mayor, should we wait for Council Member
[32:43]
Salter to return? You're welcome.
[33:16]
Okay, Matt, we almost started without
[33:17]
you, but our new town clerk reminded me
[33:21]
that we needed to get So, we're going on
[33:24]
to item 11B. Town council to consider
[33:27]
230 Wellington Avenue design review,
[33:30]
demolition permit, hillside lot permit,
[33:32]
nonconformity permit, variance, and
[33:34]
adoption of resolution number 2622
[33:38]
approving the project subject to
[33:40]
conditions. Robera, good evening, mayor
[33:43]
and council members. The item before you
[33:45]
this evening is the application for 230
[33:48]
Wellington Avenue, which requests town
[33:51]
council approval of several
[33:53]
discretionary planning entitlements
[33:56]
associated with a residential
[33:58]
development project. The applicant
[34:00]
proposes to demolish the existing single
[34:03]
family residence and construct a new
[34:06]
two-story single family home with an
[34:08]
ADU. The application includes requests
[34:11]
for design review, a demolition permit,
[34:15]
a nonconformity permit, a hillside lot
[34:18]
permit, and a variance. Each of these
[34:20]
approvals require specific findings
[34:23]
which are included in detail in your
[34:25]
resolution. The proposed residence
[34:27]
features materials including a standing
[34:31]
sea metal roof, light beige hardy laps
[34:34]
siding, vertical cedar accents, black
[34:38]
aluminum windows and exterior doors, and
[34:41]
a bronze metal fascia along the roof
[34:44]
line. The project also includes a
[34:46]
detached twocar garage and a parking pad
[34:49]
at the front of the lot, as well as a
[34:51]
trash enclosure located adjacent to the
[34:54]
garage. The outside living space
[34:57]
consists of a patio, trellis, and then a
[35:01]
swimming pool and landscaping. There's
[35:03]
also a second story deck off the primary
[35:07]
bedroom that wraps around the north and
[35:09]
west sides of the room and has uh glass
[35:12]
guard rails. So, the project was
[35:15]
reviewed by planning staff for zoning
[35:17]
consistency. And then the advisory
[35:20]
design review group reviewed the project
[35:23]
three times last year. And during their
[35:26]
last meeting last month in March for
[35:30]
consistency with the town's uh design
[35:32]
review guidelines, they considered um
[35:37]
key considerations included neighborhood
[35:39]
compatibility, building mass and scale,
[35:42]
and then privacy for adjacent
[35:44]
properties. And based on this, staff
[35:46]
drafted the required findings for all
[35:49]
requested entitlements subject to
[35:51]
conditional approval. The project
[35:54]
qualifies for a SQA exemption as
[35:56]
identified in the staff report. The
[35:58]
demolition and reconstruction of a
[35:59]
single family residence would not result
[36:02]
in any significant environmental
[36:04]
impacts. And so in conclusion, staff
[36:07]
recommends that the council consider the
[36:10]
approval of design review, the
[36:13]
demolition permit, nonconformity permit,
[36:16]
hillside lot permit, and variance, adopt
[36:19]
the resolution making the required
[36:21]
findings, and approve the project
[36:23]
subject to conditions. That concludes my
[36:25]
presentation, and I'm happy to answer
[36:27]
any questions, and the applicant is also
[36:29]
here for any questions the council might
[36:32]
have.
[36:33]
>> Questions?
[36:35]
Yes, Elizabeth. Um there was a similar
[36:39]
um elevated or you know parking pad
[36:44]
built on a hillside on Upper Toy. Um did
[36:48]
that one uh also uh request a variance
[36:52]
for additional F?
[36:55]
>> Um that one I don't think requested F
[36:58]
variance. They ex they requested a
[37:01]
variance for the location
[37:03]
because the parking pad was within the
[37:05]
setbacks.
[37:06]
In this case, the variance is for the
[37:10]
twocar garage.
[37:12]
Um and then the setbacks
[37:15]
and
[37:17]
the part the ele the the parking that's
[37:20]
on the that's elevated that's the pad or
[37:23]
that's the garage.
[37:25]
So the way the topography of the lot
[37:30]
sits, it would actually meet the front
[37:33]
of the road on Wellington, but the lot
[37:36]
slopes down.
[37:37]
>> So you will see um
[37:40]
see it elevated, I suppose, from the
[37:43]
home, not necessarily from the street.
[37:47]
>> And is the garage being rebuilt in the
[37:49]
same location or is that being is that
[37:52]
what's being built on the stilts?
[37:55]
It will be elevated. It's
[37:57]
>> okay.
[37:58]
>> Roughly in the same location, but what's
[37:59]
there now is a carport. And this would
[38:01]
be a twocar closed garage.
[38:04]
>> Okay.
[38:08]
» Motion.
[38:09]
>> No, no, no, not yet. I um Is there a
[38:12]
president to allow 520 extra square feet
[38:16]
per the hillside lot ordinance on a
[38:18]
project like this? Could Could you help
[38:20]
us defend that?
[38:25]
I'm trying to think of when F has been
[38:29]
granted. I know there was one I believe
[38:32]
on Allen and they had an entry
[38:36]
that um required
[38:38]
going upstairs and so they were allowed
[38:41]
F so that their entryway could be made
[38:44]
safer. I suppose in this case,
[38:49]
uh, they are looking for that variance
[38:51]
because the parking on Wellington is so
[38:54]
constrained. Um, also the way the
[38:57]
topography of the lot is sitting, um,
[39:00]
they're really wanting to absorb the
[39:02]
parking that they would need and not
[39:04]
have it on the street.
[39:06]
So the the the garage in essence, which
[39:09]
is the extra square feet, is helping to
[39:12]
move cars off the private road and
[39:15]
making the access safer for emergency
[39:18]
vehicles.
[39:20]
>> That's correct. And the ADR did discuss
[39:23]
this and reviewed it and came to the
[39:25]
conclusion that they would support the
[39:27]
garage for those reasons.
[39:29]
>> Okay. Thank you. Um any public comment
[39:32]
on this item,
[39:34]
>> Julie? Oh, sorry, Bill.
[39:37]
>> Just just so I understand, there there
[39:39]
is a carport there now, correct? And the
[39:42]
garage will replace essentially replace
[39:44]
the carport. Is the garage larger than
[39:47]
the carport was?
[39:48]
>> Yes.
[39:49]
>> By how much?
[39:50]
>> Um, the carport is a onecar garage, so
[39:53]
it might be maybe about 200 square feet.
[39:55]
And the garage would be for two cars and
[39:58]
some storage, so it's 520 square feet.
[40:02]
Okay.
[40:02]
>> Thank you.
[40:06]
Public comment on this item.
[40:09]
Anybody online?
[40:11]
>> No one online. Mayor,
[40:13]
>> thank you. Does the applicant wish to
[40:14]
make a statement or the applicant's
[40:15]
architect?
[40:18]
Thank you. All right, we'll bring it
[40:20]
back for discussion. Any discussion or a
[40:22]
motion? Matt,
[40:23]
>> I I just wanted to say we we looked at
[40:26]
the hillside lot or ordinance is very
[40:28]
tricky for us, but I think the other
[40:30]
ones we looked at whenever we were
[40:32]
trying to take parking off the street
[40:34]
and leave the access for for cars, we
[40:38]
seem to all agree that's a really worthy
[40:40]
goal and I support that for this reason.
[40:44]
And the as as we keep seeing like even
[40:47]
emails that we're getting about when
[40:48]
there's rain and the stuff that falls on
[40:51]
the roads like trying to keep the roads
[40:52]
clear should be a goal and if this
[40:56]
continues to come up I hope I know
[40:57]
you've been keeping a list of like
[41:00]
reforms but it might be one we think
[41:02]
about in terms of like trying to add
[41:04]
something to the hillside lot that if
[41:05]
it's a a parking situation that we sort
[41:08]
of want to try to keep the roads as
[41:10]
clear as possible and there's some
[41:12]
exception for that as opposed to it
[41:13]
always having to be a variance if that's
[41:15]
if we all agree on that. I just wanted
[41:17]
to throw that out there.
[41:20]
>> Any other discussion, Bill?
[41:22]
>> Yeah, just following up on what Matt
[41:24]
said. I'm I I have the same inclination
[41:26]
if it's a parking issue and keeping cars
[41:29]
off the street, which is a safety
[41:31]
measure really and particularly for a
[41:34]
very difficult street like Wellington. I
[41:36]
mean, that is challenging just to drive
[41:38]
up, let alone uh well, walk up or find a
[41:42]
place to park. So, um, I I think this is
[41:46]
okay. Most of the increase is a garage
[41:49]
that's in place of a structure that's
[41:51]
there, but doesn't count, as I
[41:53]
understand it, towards the square
[41:54]
footage, a carport. And I think there
[41:57]
are a few other things, some a deck and
[41:59]
so forth. But it's not as if the
[42:01]
resident is building some huge mansion
[42:03]
that we're concerned about in the hills.
[42:05]
That that is not happening here. So, I I
[42:08]
would support this project.
[42:11]
>> Mayor, I'm so sorry. We have a couple
[42:13]
hands up, but that could wait until
[42:15]
after your comments.
[42:18]
>> Yes.
[42:20]
>> Um, I think we already closed the public
[42:22]
comment period.
[42:25]
» I think I did, but I'll be nice. Go
[42:28]
ahead.
[42:29]
>> Uh, Charlie, you could go ahead.
[42:35]
» Charlie, you're on mute.
[42:40]
» Leo, can you hear me?
[42:42]
Yes, we can hear you.
[42:44]
>> Um, so my only comment would be that I
[42:47]
would want to make sure that the it is
[42:50]
used as a garage and that it's not at
[42:53]
some point converted to an exercise room
[42:55]
or every anything. So, if you could put
[42:58]
that stipulation in.
[43:03]
» Charlie, can we get your first and last
[43:04]
name, please?
[43:05]
>> Charles Goodman.
[43:12]
Thank you, Charlie. Anybody else online?
[43:16]
>> It's uh Carla Buchanan.
[43:22]
» Hi there.
[43:25]
Can you hear me?
[43:26]
>> Yeah. Hi, Carla.
[43:27]
>> Hi. Um, so I'm a neighbor uh at 210
[43:31]
Wellington. And I just wanted to add
[43:33]
that the other two neighbors, three
[43:37]
actually, are all very much in favor of
[43:39]
the garage that's planned and the
[43:42]
demolition of the um the garage that's
[43:45]
there that is quite rickety and pretty
[43:49]
much an eyesore that blocks the view.
[43:51]
And as you're all pointing out, the
[43:53]
parking situation and especially for
[43:55]
emergency vehicles is really really
[43:57]
difficult on this culde-sac. So the
[44:00]
garage that um the barriers are
[44:02]
proposing would be a huge improvement
[44:04]
and frankly a relief as well.
[44:09]
Thank you, Carla.
[44:12]
All right. Um I assume the applicant
[44:14]
still has nothing that they want to add.
[44:16]
Okay. Thank you. Um any further
[44:18]
discussion?
[44:20]
I is it possible to add a um restriction
[44:23]
or a provision that the garage be used
[44:25]
for um storing car vehicles?
[44:29]
>> Um
[44:30]
there would be no way to check up on
[44:33]
that or enforce that if someone say
[44:35]
wanted to use storage or maybe they just
[44:37]
used it for one car. Um what I will say
[44:41]
is included in what they're proposing is
[44:45]
a twocar garage and a parking pad. So,
[44:48]
there is always going to be a space for
[44:50]
a driveway for them to park there. And
[44:54]
um hopefully they'll use the two-car
[44:56]
garage. I think they will. There's no
[44:58]
reason why they wouldn't, but we
[45:00]
wouldn't be able to, you know, limit
[45:03]
that use for parking only. We can't uh
[45:06]
make them park there.
[45:07]
>> But we could have it as a provision even
[45:09]
though we can't realistically enforce
[45:11]
it. Is that correct?
[45:14]
Um, Ben, what would the provision say?
[45:20]
» Oh,
[45:26]
I think right now we have a condition of
[45:28]
approval that incorporates their design
[45:30]
which says it's a garage. So, the
[45:32]
condition of approval already requires
[45:33]
it to be a garage. So, if they violate
[45:36]
that condition, you can already bring an
[45:37]
enforcement action if they're not using
[45:38]
it for a garage purpose. The reason why
[45:40]
you can't have a direct uh condition of
[45:42]
approval saying you know you have to
[45:44]
park there all the time. There might be
[45:46]
instances where you um you know
[45:48]
different if in the future they want to
[45:50]
build an ADU or something similar to
[45:52]
that. There's certain state laws that
[45:53]
would not we would be unable to enforce
[45:55]
that condition of approval.
[46:03]
I'd like to make a motion uh that we
[46:06]
adopt resolution number 2622 approving
[46:09]
the project.
[46:14]
» Second.
[46:19]
» Council member Deli.
[46:21]
>> Yes.
[46:22]
>> Council member Kercher.
[46:23]
>> Hi.
[46:23]
>> Council member Salter.
[46:25]
>> I.
[46:25]
>> Mayor Prom Robbins.
[46:27]
>> I.
[46:28]
>> Mayor McKillan.
[46:29]
>> Yes. Motion passes 5-0.
[46:32]
>> Thank you.
[46:36]
» Item number We're moving to the
[46:38]
administrative agenda now. Item number
[46:41]
12, town council to receive a
[46:43]
presentation from the citizens advisory
[46:45]
committee regarding revising the
[46:47]
facility master plan and provide
[46:50]
direction to staff regarding information
[46:52]
council needs to proceed with
[46:54]
considering any amendments to the
[46:57]
facility master plan.
[47:00]
Christa, are you kicking this off?
[47:05]
» This is um a uh this is not coming from
[47:09]
staff. This is from our um citizens
[47:12]
group, a citizens advisory group.
[47:14]
>> Okay.
[47:15]
>> And um
[47:17]
>> okay, we're going to take a fivem minute
[47:19]
break then and we'll resume at 5 minutes
[47:20]
to 7. Thank you.
[51:59]
University.
[52:55]
Sounds very
[53:14]
It's amazing.
[53:40]
Yes.
[53:59]
Okay, we are ready to resume with item
[54:02]
number 12 on our administrative agenda.
[54:05]
Jeff and Dan
[54:30]
Um, so I will read it
[54:33]
um out loud and then uh you can ask
[54:36]
questions. I think all of you have hard
[54:38]
copies up there. Good.
[54:40]
So since we got approval to form this
[54:45]
committee in early February I think it
[54:49]
was so you know call it two plus months
[54:51]
ago. Um we've met at least a dozen times
[54:57]
and have worked on all kinds of stuff
[55:00]
here. Everything from finance to
[55:03]
architecture to I mean you name it. Um
[55:06]
and this group has been great. There are
[55:08]
eight names here. you should know. Um,
[55:11]
and they meet all kinds of uh, I don't
[55:16]
know, backgrounds and skills.
[55:19]
So, there are eight of us who in this
[55:21]
committee who have a combined um, 300
[55:25]
years of professional experience in
[55:26]
finance and real estate design,
[55:28]
construction and development.
[55:31]
Our project design is prepared for us by
[55:33]
Dan Weiny of worldrenowned architecture
[55:36]
firm Gendler Associates. This is Mr.
[55:38]
whiney.
[55:40]
The committee has been meeting twice
[55:42]
weekly for over two months to develop
[55:44]
and refine a plan and this has included
[55:48]
a deep dive into the town's existing
[55:50]
town center master plan in order to
[55:53]
ensure our plan meets all the
[55:56]
programmatic needs identified by the
[55:58]
town.
[55:59]
Additional areas of research and
[56:01]
analysis have included bond issuance,
[56:03]
ESA compliance,
[56:05]
historic preservation, emergency
[56:07]
services and procedures.
[56:10]
Should the town vote to accept our plan,
[56:13]
the ad hoc committee is prepared to
[56:15]
assist
[56:17]
town council and staff in a full
[56:19]
implementation of the plan all the way
[56:22]
from public advocacy of a bond finance
[56:24]
measure to final completion of project
[56:26]
construction.
[56:29]
The committee was purposely comprised of
[56:31]
community members both for and against
[56:33]
the closure of the Ross firehouse.
[56:36]
We have unanimously coalesed around the
[56:40]
Gendler plan which preserves our
[56:42]
historic town architecture in a
[56:45]
cost-effective and environmentally
[56:47]
sensitive manner while providing
[56:49]
sufficient space to t to house all town
[56:53]
administrative and public safety needs
[56:55]
including police, paramedic and fire.
[57:00]
Excuse me. The ad hoc committee strongly
[57:02]
recommends that the town council adopt
[57:04]
our plan as a new town center facilities
[57:06]
master plan and hires an architectural
[57:10]
engineering firm ASAP to start
[57:13]
implementing this plan with a goal of
[57:15]
placing the project finance bond measure
[57:18]
on the November 26 ballot.
[57:22]
We don't have much time.
[57:25]
So, I'm gonna turn it over now to to
[57:30]
Dan. And
[57:30]
>> so, Joey Joey and I are going to present
[57:34]
you
[57:36]
son. So, Joey and I are going to present
[57:38]
some ideas to you today. Um, but just
[57:42]
maybe a couple of opening comments. When
[57:44]
I was first asked to be on this
[57:47]
committee, I was a little bit reticent.
[57:49]
their passions were flying in the last
[57:52]
meeting and and I thought, boy, you
[57:54]
know, what am I going to get into here?
[57:56]
And all I can tell you is that this team
[58:00]
has really been extraordinary. I've
[58:01]
worked with a lot of people in my life,
[58:03]
a lot of really smart, talented people,
[58:05]
and this team is one of the best that
[58:07]
I've been part of. Um, I'm proud to be a
[58:10]
Ross resident, and it is not a Gensler
[58:13]
plan. I know it says Gensler on there.
[58:15]
It's our plan. This is something that we
[58:17]
worked on together. So, Uh, with that
[58:20]
said, I think the the last comment is
[58:22]
that,
[58:24]
you know, the the buildings that we have
[58:26]
here have been with us for over a
[58:27]
hundred years, close to a hundred years,
[58:30]
and they've served us well. And I think
[58:33]
that what we've got to keep in mind
[58:35]
moving forward, regardless of what we
[58:37]
do, is that, you know, these buildings,
[58:40]
whatever we do, has to stand the test of
[58:42]
time. It's got to be something that yes,
[58:45]
it meets all the needs that we have
[58:47]
right now, all the requirements, but it
[58:49]
also has the ability to change and and
[58:53]
that's a big task and that's a big
[58:55]
order. But, you know, I believe firmly
[58:57]
that's where, you know, we need to take
[58:59]
it.
[59:02]
» Thank you first of all for your time
[59:04]
tonight and for all of the time that
[59:06]
you've poured into this subject and this
[59:09]
issue. It's we're all here for the same
[59:12]
reason. We all love this town and as Dan
[59:15]
said, we worked very well together to
[59:17]
come up with this design that meets a
[59:20]
lot of needs and it preserves
[59:23]
optionality
[59:24]
for us going forward. Uh our goal was to
[59:27]
design and construct a facility that is
[59:29]
agile, adaptable, and will serve
[59:32]
changing needs over time. I think it's
[59:35]
really important to consider this a
[59:37]
legacy that we leave behind for the next
[59:40]
generation. We've certainly used these
[59:44]
facilities quite well over many decades
[59:47]
and it's time to renew and create
[59:51]
something for the next generation. Um,
[59:53]
and now I will hand it over to Dan
[59:56]
because obviously he did all the design.
[59:58]
>> Oh no, that's not true. All
[1:00:00]
>> right, he's the brains behind this.
[1:00:01]
>> All a good architect does is take great
[1:00:03]
ideas and put them together and
[1:00:05]
conceptualize them. And that's really
[1:00:07]
what this is all about. So everybody on
[1:00:09]
this committee had really unique
[1:00:10]
perspectives. We were all passionate
[1:00:12]
about what it was that we were trying to
[1:00:14]
advocate, but we really built consensus
[1:00:18]
around those ideas and ultimately really
[1:00:20]
developed a shared vision for this
[1:00:22]
project. And that's what you're going to
[1:00:23]
see today. The vision really needs to
[1:00:26]
express the the current, you know, the
[1:00:28]
expression of the current civic
[1:00:30]
buildings, the history of the town, town
[1:00:33]
hall, the police station, the fire
[1:00:35]
station, and the post office. They're
[1:00:36]
really a composition of buildings and
[1:00:39]
they can even though they are not
[1:00:40]
necessarily seen as one. They all relate
[1:00:43]
to one another in a very significant
[1:00:46]
way. So this is really going to be about
[1:00:49]
building something that does become a
[1:00:51]
landmark that is historic in nature but
[1:00:54]
ultimately serves the needs and
[1:00:56]
residents of the town and the staff. And
[1:00:58]
that I think is one of the most
[1:01:00]
important things is we want a place that
[1:01:01]
people want to come to work, want to be
[1:01:04]
with us and the kind of facilities that
[1:01:06]
we provide for them is critically
[1:01:08]
important. And then the last thing is
[1:01:10]
that it's got to be a timelessness that
[1:01:12]
is associated with what we're doing.
[1:01:15]
So the guiding principles that led us
[1:01:18]
through this journey uh what came out of
[1:01:21]
our discussions were principles that we
[1:01:23]
all agreed upon and would be used as a
[1:01:25]
roadmap for any of the ideas we
[1:01:27]
developed as a group. Our desire was to
[1:01:30]
design a facility that would serve the
[1:01:32]
different constituencies in our town and
[1:01:35]
become the primary community building
[1:01:38]
around which the town is organized.
[1:01:41]
We wanted a building that expressed our
[1:01:43]
history, was environmentally
[1:01:46]
sustainable, met the current operational
[1:01:49]
requirements of the town, and adaptable,
[1:01:51]
and was adaptable to future needs. We
[1:01:54]
wanted a building that remained
[1:01:56]
operational if there was a major
[1:01:58]
emergency event such as fire,
[1:02:00]
earthquake, flood, wind, etc. Most
[1:02:04]
importantly, we were seeking a building
[1:02:06]
that would utilize the town's resources
[1:02:10]
in a trustworthy manner.
[1:02:14]
» So, I'm going to let you drive, Joey.
[1:02:16]
Okay.
[1:02:17]
>> So, I want to emphasize before we look
[1:02:19]
at this that this is a conceptual idea.
[1:02:24]
This has not been developed in detail.
[1:02:27]
Um, we believe that based on the
[1:02:30]
analysis that we've all done that it
[1:02:32]
will work, but it's not meant to be
[1:02:35]
something that is to be approved right
[1:02:37]
now. It's not meant to be a pretty
[1:02:39]
picture. It's meant to be something that
[1:02:42]
I think we can all all rally around, but
[1:02:44]
there's a lot of work that needs to be
[1:02:45]
done. So, I think that keep that in
[1:02:47]
mind. This is not we didn't do detailed
[1:02:49]
planning. We didn't sit down with the
[1:02:51]
department heads. We didn't sit down
[1:02:53]
with staff and go through and that needs
[1:02:54]
to be done. That's a really important
[1:02:56]
part of the process moving forward. But
[1:02:59]
with that said, um we did look at a
[1:03:01]
number of variables in terms of trying
[1:03:03]
to figure out exactly what we needed to
[1:03:04]
do. One was the nature of the these
[1:03:08]
structures. This structure and the other
[1:03:09]
building is a registered historic
[1:03:11]
building. That's critically important.
[1:03:14]
The sensitivity of the site, the
[1:03:16]
proximity to cordier creek, the amount
[1:03:19]
of activity that these buildings get is
[1:03:21]
going to be critically important. the
[1:03:23]
programmatic and operational
[1:03:25]
requirements of the staff is number one
[1:03:27]
consideration and I think sometimes it
[1:03:30]
may be a little bit lost in conversation
[1:03:32]
but the housing next door has an is an
[1:03:36]
important part of this right so let's
[1:03:38]
say that the housing becomes a twostory
[1:03:41]
buildings and our building is a
[1:03:44]
one-story building then you have a
[1:03:45]
situation in terms of the composition of
[1:03:48]
the structures along so Francis Drake
[1:03:50]
where the housing could actually become
[1:03:52]
a more prominent infrastructure over the
[1:03:54]
town. So I think it's really important
[1:03:56]
to think about over the long run how do
[1:03:58]
we pull all of this together and I it's
[1:04:01]
also important to understand that the
[1:04:02]
variables sometimes are at odds with one
[1:04:04]
another right you think you check the
[1:04:06]
box over here and you think this is
[1:04:08]
going to work and then you realize
[1:04:09]
something over here doesn't work so
[1:04:11]
there inevitably are going to be
[1:04:13]
compromises involved and what we're
[1:04:15]
showing you does involve compromises and
[1:04:18]
I think any good design does because to
[1:04:22]
be able to solve every single problem is
[1:04:25]
in many cases virtually impossible. So
[1:04:28]
the what we came up with was what we're
[1:04:31]
calling an adaptive reuse strategy
[1:04:34]
and the building we actually came up
[1:04:36]
with a name and we're not sure you guys
[1:04:38]
like it but you can come up with
[1:04:39]
something else. It's a Ross community
[1:04:41]
and town center which will become this
[1:04:44]
has always been our primary civic
[1:04:46]
building. This building will become our
[1:04:48]
primary civic building. The design would
[1:04:51]
respect and enhance the original Spanish
[1:04:53]
clo uh colonial revival style which was
[1:04:57]
a very symmetrical design that was done
[1:04:59]
by John White in 1927.
[1:05:03]
It will retain as much of the building
[1:05:05]
as we can. It's going to retain the
[1:05:07]
original firetruck bays, the small ones
[1:05:09]
in the front that housed the fire trucks
[1:05:11]
many years ago, which will become a new
[1:05:14]
entry. and the existing fire and EMS
[1:05:16]
bays in the back of the building will
[1:05:18]
also be retained. And then we looked at
[1:05:20]
how would you expand the building. So
[1:05:22]
we're looking at in if you actually look
[1:05:24]
at the building has gone through a
[1:05:25]
number of expansions over the years.
[1:05:27]
Most of them in the back of the building
[1:05:29]
when you look at go around the building
[1:05:31]
and you can actually see how those
[1:05:33]
additions occurred. And then we also
[1:05:35]
looked at probably the most significant
[1:05:37]
change would be adding a second floor to
[1:05:39]
the building.
[1:05:42]
So the new building's going to preserve
[1:05:44]
the integrity and the original compens
[1:05:47]
uh composition of the existing town hall
[1:05:50]
and the posttop meaning that
[1:05:51]
architecturally is going to be in a
[1:05:52]
similar style. The town hall building is
[1:05:56]
going to be renovated and would continue
[1:05:58]
to play an important role as a community
[1:06:00]
meeting place. A single single two-story
[1:06:04]
building has significant advantages. One
[1:06:07]
is it greatly reduces site coverage. So
[1:06:11]
we have a lot less construction. It
[1:06:13]
minimizes disruption to environmentally
[1:06:16]
sensitive areas because we have less
[1:06:18]
work on the site. It provides more open
[1:06:21]
space in public access. It allows for
[1:06:24]
changes over time, right? Versus a
[1:06:26]
single when you do single use,
[1:06:29]
singlestory buildings that are specific
[1:06:31]
to a function, you automatically in many
[1:06:34]
ways constrain what those buildings can
[1:06:36]
do over the long run. And that's an
[1:06:38]
important consideration. And I think the
[1:06:40]
last thing is that uh we all know based
[1:06:43]
on all the residential work that we do
[1:06:46]
in town that going up is a lot less
[1:06:49]
expensive than going out. Adding
[1:06:51]
additional space above a garage or a
[1:06:53]
second floor to a home is a lot less
[1:06:55]
expensive than doing multiple buildings
[1:06:57]
because you're using essentially the
[1:06:59]
same structural systems, some of the
[1:07:01]
same mechanical electrical systems. So
[1:07:03]
it's much more efficient overall.
[1:07:07]
So the intent is that the building
[1:07:09]
becomes more open to the community and a
[1:07:11]
meeting place. The main facade and the
[1:07:15]
original truck bays, this is a very the
[1:07:17]
very original truck bays, will be
[1:07:19]
retained and renovated to become a main
[1:07:21]
entry. The floor level of the old bays,
[1:07:24]
as you know, it's a lower floor level
[1:07:25]
because it's that grade would have to be
[1:07:27]
raised to the same level of the existing
[1:07:29]
police station. Handicap access would be
[1:07:32]
accommodated within landscape design
[1:07:35]
with sloped walks, ramps as required. Uh
[1:07:39]
the landscaping would be sensitive,
[1:07:41]
lowmaintenance, natural landscaping in
[1:07:43]
keeping with the original architectural
[1:07:45]
intent.
[1:07:47]
It's interesting if you look at John
[1:07:48]
White's um original concept, probably I
[1:07:52]
don't think a lot of us necessarily paid
[1:07:53]
attention to it, but he actually does a
[1:07:57]
both in the vertical plane and the
[1:07:58]
horizontal plane. He has a beauty to his
[1:08:00]
buildings in that from a horizontal
[1:08:02]
standpoint they you they step back but
[1:08:05]
they also step back but they also have
[1:08:08]
different roof planes as well. So this
[1:08:10]
play between massing and height is a
[1:08:13]
very important part of what John has
[1:08:15]
done. So what we're trying to do is to
[1:08:18]
actually tie into that original design
[1:08:20]
and that original intent
[1:08:22]
the entire project. Oh, we're out of
[1:08:26]
sync here. We got another one.
[1:08:28]
Let's see.
[1:08:29]
>> Okay, that's that's okay. I think the
[1:08:31]
one thing we can we can go back, Joey.
[1:08:33]
That's fine. The the interesting thing
[1:08:35]
about doing the project in this manner
[1:08:38]
is that we can do it all at once, right?
[1:08:40]
Instead of phasing it and the cost
[1:08:43]
associated with phasing it and all the
[1:08:46]
disruption of all the town um you know,
[1:08:49]
all the facilities and functions and
[1:08:51]
everything else, we could potentially
[1:08:53]
move everybody off site and do this all
[1:08:56]
at one time. So, it's envisioned that
[1:08:59]
the existing building would be enhanced
[1:09:01]
to reflect details similar to town hall
[1:09:05]
potentially. Do you see here adding arch
[1:09:07]
windows with the same details? Uh the
[1:09:10]
town center would become a much more
[1:09:12]
prominent structure. I think it's
[1:09:14]
important to know that this is just
[1:09:15]
these are conceptual ideas and it's not
[1:09:18]
meant to be a final design. you know,
[1:09:21]
when we're looking at window openings or
[1:09:23]
locations and such, when we actually get
[1:09:25]
into the interior planning, the interior
[1:09:28]
planning is going to have an impact
[1:09:30]
ultimately on the exterior of the
[1:09:32]
building.
[1:09:35]
» Oh, now you got it. We did it again.
[1:09:37]
That's okay. No, you're good. That's
[1:09:39]
okay. Go to the next one.
[1:09:40]
>> So, uh, you may or may not be aware of
[1:09:43]
this, but White's original design had
[1:09:45]
two courtyards.
[1:09:47]
There was one for the police station.
[1:09:49]
There was one on the right and one on
[1:09:50]
the left and the offices actually
[1:09:52]
surrounded the courtyards. And I'm sure
[1:09:54]
what happened was, you know, this was
[1:09:56]
done in 1927 and the town's needs
[1:09:59]
changed and over time the staff got
[1:10:02]
bigger and the town got larger and so
[1:10:04]
those courtyards were filled in. So, our
[1:10:07]
intent is actually to take those
[1:10:09]
courtyards or exact same location where
[1:10:12]
White originally had them, move them to
[1:10:14]
the second floor so that we have outdoor
[1:10:17]
garden space and courtyard so that you
[1:10:20]
can see on the right hand side we have
[1:10:22]
the office space. The offices would
[1:10:24]
actually open out onto the garden and
[1:10:26]
the courtyard as well as a creek on the
[1:10:28]
other side. So you would have incredible
[1:10:31]
natural light for all of the uh all of
[1:10:34]
the staff and anybody who's actually
[1:10:36]
working in the building.
[1:10:39]
The EMS uh and fire bays in the back of
[1:10:42]
the building would be retained and
[1:10:44]
renovated to accommodate a fire truck.
[1:10:47]
Uh we still have one more bay left over.
[1:10:50]
So maybe we could use it for emergency
[1:10:52]
vehicles. We might be able to use it for
[1:10:54]
shop. We might be able to use it for
[1:10:56]
additional parking. There's no doubt
[1:10:57]
that we'll be able to use that space
[1:10:59]
overall. So, there is an option um that
[1:11:04]
we've been looking at uh and I think
[1:11:06]
it's actually included in the estimate
[1:11:08]
right now. We could actually raise the
[1:11:10]
grade in those buildings. We could
[1:11:12]
actually raise it up about a foot. It
[1:11:14]
wouldn't bring it above the flood plane,
[1:11:16]
but it would help mitigate to some
[1:11:18]
extent the the flood issue. What we
[1:11:21]
would be and again still the building is
[1:11:23]
still in the flood plane. There's no
[1:11:24]
question about that. But we believe that
[1:11:27]
there are other flood mitigation efforts
[1:11:29]
that we could take that would actually
[1:11:32]
solve that problem similar to what other
[1:11:34]
fire departments have done uh in Marin.
[1:11:37]
So I also think the other thing and this
[1:11:40]
is sort of a side comment. I I've been
[1:11:42]
here for almost well I've been here 40
[1:11:44]
years so I've seen 40 plus here. I've
[1:11:46]
seen a lot of floods and what's been
[1:11:48]
interesting to me is that with all the
[1:11:51]
work that we did downstream and the and
[1:11:53]
the bridge work that we did actually the flooding situation even though from
[1:11:58]
a weather standpoint may be more severe
[1:12:00]
seems to be a lot better than it ever
[1:12:02]
was. So I think a lot of the mitigation
[1:12:04]
work has really helped in a big way.
[1:12:10]
What's interesting about the the
[1:12:12]
building is that the original truck bays
[1:12:14]
are twostory
[1:12:15]
and so we need a two-story space to get
[1:12:18]
to the second floor. So we can use the
[1:12:20]
original truck bay areas as a lobby as
[1:12:24]
potentially a meeting space but also as
[1:12:27]
a way to put the elevators and the stair
[1:12:29]
to the to the second floor. One one
[1:12:32]
option that I think we should look at
[1:12:35]
would be to potentially frame the
[1:12:38]
building as a mass timber structure,
[1:12:41]
which means that the second floor office
[1:12:43]
space could be it could be very cool. We
[1:12:47]
could actually do exposed beams. We
[1:12:49]
could do slanted ceiling. The amount of
[1:12:52]
daylight. It would be a wonderful place
[1:12:54]
to work. And from a sustainability
[1:12:57]
standpoint would be a terrific way to
[1:12:59]
go. Uh we also, this is again sort of a a general thought, we should seriously
[1:13:05]
look at lead certification,
[1:13:08]
lead platinum possibly. Uh Joey sent me
[1:13:12]
a You guys should look at it.
[1:13:14]
Athetherton did their town hall uh town
[1:13:17]
center. It's quite a bit bigger than
[1:13:19]
ours, but it it's similar actually in
[1:13:21]
Spanish style. They did a net zero
[1:13:24]
building, you know. So we maybe we set
[1:13:27]
the bar high for ourselves and we do a
[1:13:29]
net a net zero building. Um but
[1:13:32]
nonetheless I think from a
[1:13:33]
sustainability standpoint you know
[1:13:36]
looking at these kinds of ideas would be
[1:13:38]
terrific.
[1:13:42]
So this is uh and we we did not have a
[1:13:46]
detailed site plan. That's one of the
[1:13:47]
things we're going to ask you for. So, a
[1:13:50]
lot of what we did was based on um
[1:13:53]
drawings that we had um information that
[1:13:56]
we had, the original building plans, but
[1:13:58]
we've retained both of the main entry
[1:14:01]
and exit points on the site. Uh given
[1:14:04]
the reduced site coverage, we have the
[1:14:06]
ability to actually So, one of the
[1:14:09]
question I think is going to come up and
[1:14:10]
Joey's going to talk a little bit about
[1:14:12]
it is going to be the program, right?
[1:14:14]
Does this meet the program or not? Um,
[1:14:17]
and we have to keep in mind that this is
[1:14:19]
not a final, again, a final idea. It's
[1:14:23]
an idea. It's not a final plan. We do
[1:14:25]
have the ability to add more space to
[1:14:27]
the building. We can go the back uh the
[1:14:30]
back bays that you can see the roof line
[1:14:32]
could be extended. We could actually
[1:14:34]
make this building extended on the side
[1:14:37]
if we needed to. I don't think we will.
[1:14:39]
I think we have more than enough space.
[1:14:42]
But we also have enough room on the site
[1:14:44]
now that if we wanted to add an
[1:14:46]
ancillary building, small building, we
[1:14:48]
could. And one of the things um that we
[1:14:51]
discussed because we don't have a a a
[1:14:54]
real deep understanding of the
[1:14:56]
programmatic requirements, but one area
[1:14:58]
public works has asked for a shop for
[1:15:00]
instance. Well, you know, a shop
[1:15:03]
probably shouldn't be in the main
[1:15:04]
building. So why not do a small
[1:15:05]
ancillary building that has a shop and
[1:15:08]
some of the other support facilities?
[1:15:10]
And that's actually what we've shown on
[1:15:12]
the right hand side is the ability not
[1:15:14]
necessarily in that location, but we can
[1:15:16]
add additional structures if we need to the to the site overall.
[1:15:24]
» So we are emphasizing again that this is
[1:15:26]
a conceptual plan. Um we did not have a
[1:15:30]
lot of existing information to go on to
[1:15:33]
help us with detailed planning. We
[1:15:35]
didn't have a survey of the site and we
[1:15:37]
didn't have drawings of the existing
[1:15:38]
buildings. We basically took the square
[1:15:41]
footage requirements from concept B and
[1:15:45]
added what would be needed for a fire
[1:15:47]
capacity and put those together and came
[1:15:50]
up with the the allotments for our block
[1:15:54]
plan. So just again emphasizing that
[1:15:57]
this is conceptual but that we have
[1:16:00]
determined that all of this square
[1:16:02]
footage can fit into the plan.
[1:16:06]
>> Okay. So you you've seen in the p in the
[1:16:10]
package what we showed as our initial um
[1:16:13]
oh sorry there you go
[1:16:15]
>> stand
[1:16:16]
>> okay this yeah here I can actually I
[1:16:18]
probably should use this laser pointer
[1:16:19]
since I've been sitting here on it um
[1:16:22]
this actually shows you where we have
[1:16:25]
added space so there's some infill areas
[1:16:27]
in the front but you can see the back of
[1:16:29]
the building how jagged it is so this
[1:16:31]
has gone through a number of additions
[1:16:33]
so by actually expanding the building in
[1:16:35]
the back in these two areas. We pick up
[1:16:38]
area on the first floor and then this
[1:16:41]
entire area right here is second floor
[1:16:44]
space. And as I mentioned, we have the
[1:16:46]
ability to push this roof line back if
[1:16:48]
we need to. And we could even
[1:16:50]
potentially push these little wings out
[1:16:52]
if we need to, but I don't think we
[1:16:54]
will. I think the the bottom line is
[1:16:56]
that from programmatic standpoint, what
[1:16:59]
we have blocked out right now is about
[1:17:02]
2,000 square feet more than what we
[1:17:04]
need. So the question is will can this
[1:17:08]
accommodate a fire operation and the
[1:17:10]
answer is yes we believe that it can.
[1:17:13]
Part of what we have to um really refine
[1:17:17]
is when you look at the program there
[1:17:20]
are spaces that have been defined in
[1:17:22]
various departments that are somewhat
[1:17:25]
redundant. Right? know whether we're
[1:17:27]
talking about toilet facilities or
[1:17:30]
lockers or we're talking about
[1:17:32]
potentially a kitchen area or a fitness
[1:17:34]
facility and such.
[1:17:36]
>> Just Yeah, there you go.
[1:17:37]
>> No, no, no. Keep going.
[1:17:39]
>> Okay. Um that these areas um so a lot of
[1:17:43]
these things potentially could be
[1:17:45]
combined. So rather than doing you know
[1:17:48]
toilet areas here, here and here, why
[1:17:50]
not do one space, right? Why not would
[1:17:52]
do one space for fitness and one space
[1:17:54]
for a kitchen and one space for a living
[1:17:56]
room that can be shared across the staff
[1:17:59]
and potentially the police and the and
[1:18:01]
the fire departments.
[1:18:05]
» So I we were we're kind of sharing this part of the presentation. Um if we
[1:18:11]
decide that a fire station can happen,
[1:18:15]
we definitely have room for it. If we
[1:18:18]
decide later on that that's not going to
[1:18:20]
work, we have space available for other
[1:18:23]
community needs or desires, uh it has
[1:18:26]
been discussed in our group that it
[1:18:28]
could be a wonderful gathering space
[1:18:30]
with or without a fire station. Uh it
[1:18:33]
could be a senior center. I think what's
[1:18:35]
really important for us going forward is
[1:18:39]
to use our imagination and think of all
[1:18:42]
that this could just to envision
[1:18:45]
everything that this could bring to town
[1:18:48]
people. They would have a place to
[1:18:51]
gather. You know, Dan mentioned the
[1:18:53]
Athetherton uh town center. I got an
[1:18:57]
email from my son saying that he lives
[1:19:00]
right near that and they redeveloped it
[1:19:02]
beautifully. He said, "You should tell
[1:19:03]
them about that tonight that I go study
[1:19:06]
there. There's a cafe and it's a place
[1:19:09]
where people gather." And you think if
[1:19:12]
we had the affordable housing right
[1:19:14]
there, maybe that's a place where those
[1:19:16]
folks would come and hang out and it
[1:19:19]
would bring more of the town together
[1:19:21]
than just the high and buy at the post
[1:19:24]
office. So, I think we should sort of
[1:19:26]
look at this as this grand gesture in
[1:19:29]
our town of making a community space
[1:19:32]
that has a lot of options.
[1:19:36]
Next,
[1:19:38]
>> I think that's enough of that.
[1:19:40]
>> Yep. Okay. So you you guys um have
[1:19:44]
actually this is in your package and
[1:19:47]
there are a lot of of different
[1:19:49]
advantages that we have to this plan
[1:19:50]
whether we're talking about satisfying
[1:19:52]
the master plan requirements or talking
[1:19:55]
about the historic aspect of it or the
[1:19:57]
environmental aspect of it. There's some
[1:20:00]
real significant advantages of doing one
[1:20:04]
building, an important building, a
[1:20:06]
building that basically becomes our our
[1:20:08]
town center. Um again it's been a
[1:20:12]
hundred years this you know the
[1:20:14]
buildings have served us well but I
[1:20:16]
think ultimately we all have a
[1:20:18]
responsibility of doing something for
[1:20:21]
the town. This is going to be part of
[1:20:22]
what we leave right there's been a lot
[1:20:25]
of generations that have been here and
[1:20:27]
when we're gone there going to be other
[1:20:28]
families here and I think it's really
[1:20:30]
important that we ultimately leave
[1:20:32]
something that we're proud of.
[1:20:36]
And on that same point, um, one of my
[1:20:39]
friends brought up the word stewardship
[1:20:41]
as a a real key word to think about with
[1:20:45]
this move that we might make and to
[1:20:48]
imagine that many of us have been
[1:20:50]
fortunate to raise our children here and
[1:20:53]
have these amenities that we all took
[1:20:55]
for granted. The beautiful school, the
[1:20:58]
post office, the Rosscom and the town
[1:21:01]
hall, the fire station. And it might be
[1:21:05]
time to pay that forward and to create
[1:21:07]
something beautiful for the next
[1:21:09]
generation.
[1:21:11]
>> Okay. So, now we have I think you guys
[1:21:14]
have actually seen the video, but I
[1:21:16]
think we're going to Jeff, you want to
[1:21:17]
play the
[1:21:18]
>> Yeah, why don't we go ahead and play it?
[1:21:21]
>> Um, maybe while Jeff's getting that
[1:21:23]
ready, I I maybe have another personal
[1:21:26]
comment. You guys, we, you know, we
[1:21:27]
looked at this building 25 years ago and
[1:21:31]
we did when we did that study, the
[1:21:34]
criteria was different, the program was
[1:21:36]
different. Um, one of the things that we
[1:21:39]
looked at was to get the entire building
[1:21:41]
out of the flood plane, which means
[1:21:42]
meant either demolishing or lifting that
[1:21:45]
entire building up. And when we did the
[1:21:46]
analysis of that building, we recognized
[1:21:49]
then way back then that it needed to be
[1:21:51]
gutted, right? it needed new electrical,
[1:21:53]
needed new mechanical, it didn't need
[1:21:56]
new seismic, that there was a complete
[1:21:59]
redo of that building that was required.
[1:22:01]
Um, my position then
[1:22:05]
um was that we should do a rehab and a
[1:22:08]
renovation of that building. That was our recommendation at the time.
[1:22:12]
This is 2000. Um, and I still feel
[1:22:15]
strongly in in that that that is the
[1:22:18]
right way to go. It it's essentially
[1:22:21]
what we're going to end up here with is
[1:22:23]
a new building. We're going to have a
[1:22:27]
facade that respects what John White
[1:22:29]
did. We're going to have a building that
[1:22:31]
ultimately is one that I believe could
[1:22:33]
become a center for the entire town. But
[1:22:36]
it will in every way be a new building.
[1:22:39]
And I think we have to keep that in mind
[1:22:41]
that that it isn't it's not just a
[1:22:44]
renovation of an existing structure and
[1:22:46]
that a lot of things are going to remain
[1:22:48]
as it that's not the case. This is going
[1:22:50]
to require a lot of work and ultimately
[1:22:54]
we're going to end up with a building
[1:22:55]
that in fact will last another hundred
[1:22:57]
years.
[1:22:59]
>> I'm gonna need that. Go.
[1:23:02]
>> Will you need this?
[1:23:03]
>> I will.
[1:23:04]
>> Oh, there you go.
[1:23:05]
>> Okay.
[1:23:08]
This is a uh
[1:23:10]
this is a YouTube video that uh the
[1:23:14]
Gendler team put together. Um we've seen
[1:23:18]
almost a 100red views of this thing
[1:23:21]
since we published it two days ago I
[1:23:23]
think it was. So,
[1:25:35]
I like it.
[1:25:39]
Okay,
[1:25:42]
mute this.
[1:25:46]
One second. So, our agenda tonight
[1:25:51]
is introduce you to the conceptual plan.
[1:25:55]
want to do a preliminary cost analysis,
[1:25:58]
pardon me, and review a timeline and
[1:26:00]
schedule. We'll get to that shortly.
[1:26:02]
Review permanent financing for this.
[1:26:04]
We've done a lot of homework on that.
[1:26:07]
Next steps, an RFP for an architectural
[1:26:10]
engineering and consulting services, all
[1:26:13]
of which are necessary.
[1:26:15]
Funding for a site survey as built and
[1:26:18]
selective investigations.
[1:26:21]
appoint a public private working group.
[1:26:24]
And if you all agree that this is
[1:26:27]
something, pardon me, you want to do,
[1:26:30]
the friends of the Ross Firehouse will
[1:26:32]
immediately withdraw their ballot
[1:26:34]
initiative
[1:26:35]
for this June.
[1:26:39]
Now, I'm going to introduce Mr. Ed Dong.
[1:26:43]
Take it away.
[1:26:45]
>> Thank you, Jeff. Uh, my name is Ed Dong.
[1:26:48]
I'd like to talk to you about costs.
[1:26:53]
What we have here is a is a uh a summary
[1:26:56]
of of our work and in comparison with
[1:26:58]
the KPA concept Budget.
[1:27:02]
Uh the slide is first project cost
[1:27:05]
estimate. We call it first project or
[1:27:07]
first cost estimate because it is a
[1:27:09]
concept budget and as we move through
[1:27:12]
we'll have progressive budgets to keep
[1:27:15]
real time uh updates on where we are in
[1:27:18]
design and cost. So right now this is
[1:27:20]
the concept first project uh cost. First
[1:27:24]
line is the KPA budget uh presented in
[1:27:27]
2023.
[1:27:29]
We've added an adjustment factor and uh
[1:27:32]
you know we see their 2026 cost at 24.7
[1:27:37]
million. At that time they were
[1:27:40]
proposing to build uh 11,700
[1:27:44]
square ft with a budget uh of 2,115
[1:27:49]
per square foot with no fire station
[1:27:51]
programmed in that plan. Uh the proposed
[1:27:55]
civic and community concept uh we
[1:27:59]
believe we can deliver at $22.7 million,
[1:28:03]
$2 million less than the KPA concept B
[1:28:06]
budget. Uh interestingly, we believe we
[1:28:10]
can deliver almost 2,000 ft extra of
[1:28:13]
program space for our budget of 1,680
[1:28:17]
square uh dollars per square foot,
[1:28:19]
including a firehouse.
[1:28:22]
Now the the drill down budget is very
[1:28:25]
detailed and very very tiny. You have it
[1:28:28]
in your package. We didn't see fit to
[1:28:29]
have it on the screen because no one no
[1:28:32]
one would be able to read it.
[1:28:34]
But uh uh let me emphasize and point out
[1:28:38]
how and why we think that this is the uh the favored direction to to to
[1:28:45]
move with the 2000 the two million
[1:28:49]
dollar savings. we believe uh we can
[1:28:52]
generate is first of all this is an
[1:28:55]
adaptive reuse property. We see this
[1:28:58]
using the the beauty of the design using
[1:29:01]
the existing building using the same
[1:29:02]
footprint and building as Dan indicated
[1:29:05]
building up. So, you know, we save cost
[1:29:09]
on on a on a new building. Uh we we're
[1:29:13]
saving the roof, we're saving the
[1:29:15]
facade. So we believe this is a very
[1:29:17]
economic uh way to go. In doing so we
[1:29:22]
are maintaining the site. So the KPA
[1:29:27]
plan envisioned demolishing raising the
[1:29:30]
entire building and all the site environ
[1:29:34]
including trees. We will have everything
[1:29:38]
maintained. So there should be minimal
[1:29:40]
site uh renovation improvements to to to
[1:29:45]
deliver this. Also we are keeping the uh
[1:29:48]
apparatus bays at the back so that in
[1:29:52]
the event the town moves for a fire
[1:29:55]
station we do not have to rebuild those
[1:29:58]
apparatus bays. Those are fun. They were
[1:30:00]
functional uh previously. They'll be
[1:30:02]
functional in the future.
[1:30:05]
in pricing I'm sorry in pricing this we
[1:30:08]
went to two uh local general contractors
[1:30:12]
uh both very very wellestablished uh
[1:30:17]
regional builders both building upwards
[1:30:20]
of a million to two to1 to2 billion
[1:30:23]
dollars volume a year sweet spots in
[1:30:25]
building are anywhere from 10 million to
[1:30:27]
75 million so this 23 24 million project
[1:30:31]
is right in their sweet spot uh both
[1:30:34]
these companies Swinton Builders and
[1:30:36]
Build Group. They specialize in historic
[1:30:39]
restoration, civic redevelopment,
[1:30:41]
adaptive reuse. And uh again, this is
[1:30:45]
right down the strike zone. We have
[1:30:47]
selected uh build group to highlight
[1:30:50]
here and it's in your package. Build
[1:30:52]
group tooured the building. They
[1:30:55]
understood the crawl space under uh
[1:30:59]
under the floorboards. They looked at
[1:31:01]
the potential foundation requirements.
[1:31:03]
They looked at the uh the envelope
[1:31:06]
framing. They looked at the roof framing
[1:31:08]
and uh they formed the basis of their
[1:31:11]
renovation rebuilding cost on on that
[1:31:14]
inspection.
[1:31:20]
The pricing that you see in little tiny
[1:31:23]
print in your package, it is a
[1:31:25]
prevailing wage union pricing for a risk
[1:31:30]
category for ESA design that is for an
[1:31:34]
essential
[1:31:36]
building design uh that this building
[1:31:39]
will be and therefore the price includes
[1:31:42]
the enhanced structural, seismic and
[1:31:45]
functional durability that's required
[1:31:47]
for for essential buildings.
[1:31:55]
build group
[1:31:58]
looked at every component of this of
[1:32:01]
this build. Uh they broke it down to 24
[1:32:04]
25 cost categories. Uh they estimated
[1:32:07]
this will take 15 months to to deliver.
[1:32:11]
So their price includes the the the
[1:32:14]
personnel, the management, the the site
[1:32:17]
requirements to sustain that that
[1:32:19]
building and delivery period. They
[1:32:21]
looked at the amount of concrete that
[1:32:23]
would be required for the new
[1:32:25]
foundations to build up. They looked at
[1:32:27]
all the framing, not only the the uh the
[1:32:30]
wall and ceiling framing, but also the
[1:32:32]
enhanced seismic and structural framing
[1:32:35]
needed uh you know for this ESA
[1:32:37]
requirement.
[1:32:39]
uh drywall, walls, ceilings, the windows
[1:32:42]
that you saw in uh in in Dan and Joey's
[1:32:45]
presentation, we've got that covered in
[1:32:48]
scope. Elevator, two-stop elevator. This
[1:32:50]
building is ADA ADA accessible. All the
[1:32:54]
finishes, all as as Dan said, a new
[1:32:56]
building. Yes. All the mechanical,
[1:32:58]
electrical, plumbing systems will be all
[1:33:00]
new up to uh you know, up to uh you
[1:33:04]
know, leading edge standards. full com
[1:33:06]
uh communications security low voltage
[1:33:10]
all taken into account.
[1:33:12]
You know, we have we have funds in there
[1:33:16]
also, as Dan indicated, to to raise the
[1:33:19]
apparatus bay floor if we decide to do
[1:33:22]
that in consideration of some flood
[1:33:24]
mitigation.
[1:33:27]
We have included uh design contingency,
[1:33:32]
construction contingency.
[1:33:35]
We have soft cost included architect,
[1:33:38]
mechanical, electrical, plumbing
[1:33:39]
engineer, structural engineer, uh
[1:33:42]
historic, you know, preservation
[1:33:44]
consultants, construction management,
[1:33:46]
permits, fees, testing and inspections.
[1:33:49]
So again, too tiny to present on the
[1:33:52]
board, but you know, in summary, we
[1:33:54]
believe we can deliver this building and
[1:33:56]
the and the uh uh and the maintained
[1:33:58]
site for $22.7 million.
[1:34:02]
Uh again, adaptive reuse building,
[1:34:05]
retaining the sitework apparatus bays.
[1:34:08]
We're going to reuse tie into the
[1:34:10]
existing facilities and infrastructure
[1:34:13]
and uh you know a lot of the programming
[1:34:16]
of the different departments will come
[1:34:18]
out during the schematic design. At that
[1:34:20]
point we can take a look at the
[1:34:21]
requirements for police yard uh you know
[1:34:25]
any uh any public works yards and we'll take that into account. So I'll be available for questions.
[1:34:35]
Any questions? Bob.
[1:34:37]
>> Yeah, I should have said this at the
[1:34:39]
outset. I think we wanted you to finish
[1:34:41]
your presentation and then we'll have
[1:34:43]
council questions
[1:34:44]
>> and then we'll ask staff questions. Then
[1:34:47]
we can take public comment and then we
[1:34:49]
can bring it back for discussion and
[1:34:50]
further further steps.
[1:35:00]
Wait, are we up to project timeline?
[1:35:03]
Yeah. Yeah.
[1:35:05]
Uh Bob Herpst uh ad hoc committee
[1:35:08]
member, president, friends of Ross
[1:35:10]
Firehouse. Welcome guys. Thank you.
[1:35:14]
Uh project timeline. So the primary
[1:35:16]
purpose of this is to demonstrate that
[1:35:18]
we can get this building done in time to
[1:35:20]
move the paramedics in in January 2029
[1:35:23]
pursuant to our existing RVPA paramedic
[1:35:26]
lease. Um there's really three
[1:35:28]
components in this timeline. Ed
[1:35:30]
mentioned the construction component.
[1:35:32]
That's 15 months. that's uh at the
[1:35:34]
bottom of the chart. Um, currently if we
[1:35:38]
hit all these timelines, which will
[1:35:39]
require uh require you guys to make a
[1:35:43]
pretty prompt decision that you like
[1:35:45]
this plan, but if if we uh get started
[1:35:49]
promptly, um we'll have several months
[1:35:52]
uh extra time to move our BPA paramedics
[1:35:55]
in. Uh the other two primary components
[1:35:59]
other than the construction timeline are
[1:36:01]
the SQA review and permitting timeline
[1:36:04]
and the architecture and engineering
[1:36:05]
timeline. In this uh chart we've got the
[1:36:09]
architecture and engineering broken into
[1:36:11]
two components. The first is schematic
[1:36:12]
design and costing and that's basically
[1:36:15]
a three-month time period. Um and then
[1:36:18]
the final component is four months which
[1:36:20]
is working drawing. So that's the, you
[1:36:23]
know, the 50 pages of of drawings of
[1:36:25]
exactly what the contractor needs to do
[1:36:27]
to uh execute the project. Um, what
[1:36:30]
we're recommending to town council if
[1:36:33]
they decide to pursue this plan is to
[1:36:35]
bring on that schematic architectural
[1:36:37]
designer as soon as possible. Go to RFP
[1:36:40]
in May if you can. Um, get them on board
[1:36:43]
to complete that three-month process.
[1:36:45]
The the design component is going to be
[1:36:47]
two months, then we'll cost it with
[1:36:48]
contractors. Three months. that could
[1:36:51]
potentially give you guys the
[1:36:53]
opportunity to go to the voters in
[1:36:56]
November with a fully costed plan. Um,
[1:37:00]
if you're not comfortable with that and
[1:37:02]
can't get there in time for November, it
[1:37:05]
can move to June. That doesn't affect
[1:37:06]
this timeline. We'll still be working on
[1:37:09]
the full design. We'll still be working
[1:37:10]
on the SQA permitting. That will be
[1:37:12]
done, as you can see on the plan, in
[1:37:14]
time for a June ballot measure as well.
[1:37:16]
So, that's really for you guys to
[1:37:18]
decide. And if you like this plan and
[1:37:21]
want to proceed with it, it is important
[1:37:23]
to get moving on hiring that schematic
[1:37:25]
designer. Thank you.
[1:37:31]
Okay.
[1:37:33]
Um,
[1:37:35]
financing a project. Turns out it's
[1:37:37]
complicated.
[1:37:39]
The only realistic and feasible source
[1:37:41]
of financing is a general obligation
[1:37:43]
bond.
[1:37:46]
The only permitted use of funds from a
[1:37:48]
general obligation bond are brick and
[1:37:51]
mortar construction. You cannot use it
[1:37:54]
for operations, salaries, and so on. And
[1:37:58]
it requires a twothirds vote by the
[1:38:01]
voters.
[1:38:03]
And it's important to understand this is
[1:38:05]
I'm sure familiar to you, but I want to
[1:38:08]
make sure everybody understands
[1:38:11]
the go tax, the general obligation. And
[1:38:13]
the go tax is based on a parcel's
[1:38:15]
assessed value,
[1:38:18]
not a parcel.
[1:38:22]
tax like the public safety
[1:38:26]
parcel tax we have in Ross. It's the
[1:38:29]
same amount for everybody.
[1:38:32]
Your next door neighbor has the same tax
[1:38:34]
that you have.
[1:38:38]
Assessed value is what you paid for your
[1:38:41]
house and what you've done to improve
[1:38:43]
it.
[1:38:45]
And therefore, everybody's assessed
[1:38:48]
value is unique.
[1:38:53]
Now, a $10 million bond, and I use this
[1:38:56]
the number 10 partly because it's an
[1:38:59]
easy number to get in your head and do
[1:39:01]
math with, but $10 million bond of 4%
[1:39:04]
interest over 30 years would require
[1:39:06]
annual payments of about $580,000 a
[1:39:09]
year.
[1:39:11]
And by the way, you had a presentation
[1:39:14]
last month, was it with um the field, how do I pronounce the name?
[1:39:21]
Fields Yeah, Fieldman. So, I've gone
[1:39:24]
through all of my arithmetic with the
[1:39:26]
Fieldman guy just to make sure that I
[1:39:28]
wasn't doing it wrong and I wasn't.
[1:39:33]
And we'll get into this more in the next
[1:39:35]
slide. in Ross,
[1:39:38]
you when you get do all the math,
[1:39:41]
the parcel, pardon me, the um assessed
[1:39:44]
value tax for the general obligation
[1:39:47]
bond is about $20 per $100,000 of
[1:39:50]
assessed value.
[1:39:54]
The town's assessed value increases
[1:39:56]
about 2 to 4% annually, and that happens
[1:39:58]
everywhere. And it is limited to that by
[1:40:01]
Prop 13.
[1:40:04]
And the people who make that decision to
[1:40:06]
increase it, of course, the Marin County
[1:40:08]
Assessor.
[1:40:10]
But when you do that,
[1:40:13]
the effective tax goes down because the um assessed value of the whole town
[1:40:19]
is going up.
[1:40:22]
So, for example, for a home that has 2
[1:40:25]
million of assessed value, that tax
[1:40:28]
works out to about $400 a year
[1:40:32]
declining with such value increases.
[1:40:39]
I want to spend some time talking about
[1:40:41]
this, but um
[1:40:44]
it's this button, right? Yep.
[1:40:49]
» Oh, there it is. The assessed value of
[1:40:53]
all the homes and Ross
[1:40:56]
as of November last comes to $2.95
[1:41:00]
billion.
[1:41:02]
That is a stunning number.
[1:41:04]
But that's just the assessed value. The
[1:41:06]
market value is probably three times
[1:41:08]
that.
[1:41:10]
A median home of assessed value in Ross
[1:41:14]
is 2 and a half million.
[1:41:17]
And this pie
[1:41:19]
divides it in all of the homes in Ross
[1:41:22]
into 10 into pardon me 10 segments. Each
[1:41:26]
segment is 83 homes.
[1:41:31]
And when you look at the top of the of
[1:41:33]
the pie, where's my little
[1:41:36]
There it is. That little teeny sliver of
[1:41:39]
red at the 12:00 point in the in the pie
[1:41:43]
has as many homes as the big blue pie
[1:41:47]
just to its left.
[1:41:50]
That red pie has a 23 million, pardon
[1:41:53]
me, that red slice has a $23 million
[1:41:56]
assessed value. The same number of homes
[1:42:01]
across to to the left has $978
[1:42:06]
million of assessed value.
[1:42:10]
20% of the homes in Ross account for
[1:42:14]
$1.5 billion of assessed value. And if
[1:42:18]
you go clockwise, starting at 12:00,
[1:42:22]
each of the pie slices gets a little bit
[1:42:24]
bigger.
[1:42:27]
It's a ton of money that's out there.
[1:42:31]
So,
[1:42:34]
I'm I think unless there's something
[1:42:36]
right away, I'm going to move on. So,
[1:42:39]
that is you.
[1:42:46]
» So, this one's mine, right? Okay. So,
[1:42:49]
just a number of requests that we have
[1:42:51]
to get this moving forward.
[1:42:53]
>> Yep. One would be to develop an amended
[1:42:56]
master plan based on this idea of
[1:42:58]
working with Kristen's staff and
[1:43:00]
actually amending what it is that we've
[1:43:02]
been working on. We need um we couldn't
[1:43:05]
find one. It may exist somewhere, but we
[1:43:07]
need a site survey done quickly.
[1:43:10]
Identifying the buildings, where they're
[1:43:12]
located, the structures, the topography,
[1:43:16]
um major landscaping, trees, that kind
[1:43:19]
of thing. That needs to be done. That
[1:43:20]
could be moved forward right away. We're
[1:43:22]
going to need it no matter what. So,
[1:43:23]
that should be done. Asbuilt drawings of
[1:43:26]
town hall. Um, it's not an expensive
[1:43:29]
process to get as built drawings of this
[1:43:32]
building and the other building. Um,
[1:43:34]
laser technology allows us to do it very
[1:43:36]
quickly. As far as the other building is
[1:43:38]
concerned, we'd also want to make sure
[1:43:40]
that we identify any structural walls in
[1:43:42]
the building and such to to make sure
[1:43:44]
that we're planning um, you know,
[1:43:46]
properly moving forward. We would like
[1:43:49]
to do a limited amount of exploration in
[1:43:53]
the existing building. Maybe opening up
[1:43:56]
ceiling here and there. We have to be
[1:43:58]
careful about it because the building's
[1:43:59]
occupied. Uh it would be very minimal
[1:44:02]
amount of work, but it would give us a
[1:44:04]
better understanding of maybe some of
[1:44:06]
the work that potentially needs to be
[1:44:08]
done. As we talked about it, the the
[1:44:11]
question would be why would we do
[1:44:12]
schematic design and break it into
[1:44:14]
pieces? I think that it would be ideal
[1:44:18]
if we selected one architect to do the
[1:44:20]
whole thing. However, any architect just
[1:44:24]
like any general contractor giving us
[1:44:26]
prices right now is going to put a big
[1:44:28]
contingency in their number because they
[1:44:30]
don't know exactly what it is that
[1:44:31]
they're going to do. So, there's a
[1:44:34]
couple of advantage of doing schematic
[1:44:35]
design. schematic design are going to
[1:44:37]
include floor plans, elevations, working
[1:44:41]
with the department heads and coming up
[1:44:43]
with detailed plans for the police
[1:44:44]
station, offices, public works,
[1:44:46]
everything. It'll also include outline
[1:44:50]
specifications and enough information to
[1:44:53]
be able to develop a budget that we can
[1:44:57]
hang our hat on. Right now, all
[1:44:59]
everything that everybody's been done is
[1:45:01]
a conceptual budget. And I guarantee you
[1:45:04]
that there is a lot of, you know, a lot
[1:45:06]
of contingency across the board.
[1:45:09]
Contingency, contingency on top of
[1:45:11]
contingency. So, and this is a pretty
[1:45:13]
typical process. Get it to the point.
[1:45:16]
And what it allows us to do, we have
[1:45:18]
plans, we have specifications,
[1:45:20]
we can get pricing, and if you want to
[1:45:22]
try to move forward with the bond this
[1:45:24]
year, we can do this in three months. So
[1:45:27]
have enough information but it's I'm not
[1:45:29]
sure we meaning the process that we need
[1:45:32]
to go through of selecting architects
[1:45:34]
can be done that quickly but the
[1:45:35]
schematic design work could actually be
[1:45:37]
done done in in three months. So, and
[1:45:40]
then you could you could ask an
[1:45:43]
architect for instance and or other
[1:45:44]
consultants, give us money, do schematic
[1:45:47]
design. This is what it looks like. They
[1:45:49]
can do an estimate for the entire
[1:45:50]
project. But once they have
[1:45:52]
clarification on what it is that they're
[1:45:54]
doing, contract documents, contract
[1:45:57]
administration, everything else is much
[1:45:59]
more manageable to them and their
[1:46:01]
numbers are going to ultimately be a lot
[1:46:03]
tighter. So, I think we can simplify the
[1:46:06]
process, move it forward quickly. it
[1:46:08]
does mean move spending money. Um the
[1:46:11]
schematic design normally is going to be
[1:46:13]
somewhere around 15% of the overall
[1:46:16]
fees. So it there's an investment that
[1:46:19]
would be made that you know hopefully
[1:46:20]
we'd be able to use downstream. I think
[1:46:23]
that the one other thing would be
[1:46:24]
getting a historic consultant on board.
[1:46:27]
We have registered historic structures.
[1:46:29]
So the the the question is and I think
[1:46:32]
we all believe that these buildings
[1:46:34]
would be given special consideration in
[1:46:36]
terms of environmental impact and SQA
[1:46:39]
and such. Um, not necessarily that we
[1:46:42]
would get a negative declaration, but we
[1:46:45]
potentially could, you know, work with
[1:46:47]
historic consultant, work with
[1:46:49]
environmental consultant and greatly
[1:46:51]
reduce the amount of time, effort, and
[1:46:54]
money that would go into some of the
[1:46:56]
environmental remediation work that
[1:46:58]
would need to be done.
[1:47:03]
This is
[1:47:05]
>> um yeah this one I'll just summarize in
[1:47:06]
sort of one comment and it was said at
[1:47:08]
the very beginning and that is that it's
[1:47:11]
I think we all believe that it would be
[1:47:13]
really helpful and important to have a a
[1:47:16]
public private working group uh to work
[1:47:19]
with Christa to move the project forward
[1:47:22]
uh quickly. I think having I mean what
[1:47:24]
we've all seen is having the kind of
[1:47:27]
resources that we all can draw on to be
[1:47:30]
able to to help in in a significant way
[1:47:34]
I think is really valuable to the town.
[1:47:36]
The fact that everybody here and there
[1:47:38]
are others around that are willing to
[1:47:40]
put their time and their money and the
[1:47:42]
talent of their people and their staffs
[1:47:43]
and themselves into an effort like this
[1:47:46]
is a big deal. And not to take advantage
[1:47:48]
of it I think would be unfortunate. And
[1:47:51]
I think quite frankly given the time we
[1:47:53]
have and all the other constraints that
[1:47:55]
if we can do this you know it's it means
[1:47:58]
doing it more like a project would be in
[1:48:00]
the private sector but at least
[1:48:02]
accelerate you know a typical process
[1:48:05]
that we would have to go through
[1:48:08]
and I think is that it
[1:48:10]
>> that's it you're up
[1:48:13]
>> oh
[1:48:13]
>> bill
[1:48:15]
your
[1:48:19]
well really Um,
[1:48:21]
I'm I'm going to have to
[1:48:29]
» really
[1:48:44]
We're want to talk about the financing
[1:48:47]
of the project. And here Jeff and and
[1:48:50]
really Tom, if you don't mind, I really
[1:48:53]
need to ask you to step in here. I'll do
[1:48:56]
the panime
[1:48:58]
and and we can talk about the financing
[1:49:01]
of this,
[1:49:02]
>> but you're you're going to be skilled at
[1:49:04]
talking about the geo bond and all that.
[1:49:07]
>> Yes, I am. This is out of my league. So
[1:49:10]
there.
[1:49:16]
» Thanks, bro. All right. So the uh as as
[1:49:19]
we have up here on the slide, the in
[1:49:22]
terms of the next stops
[1:49:24]
for uh the bond approval. I know some of
[1:49:28]
you on the town council have a lot of
[1:49:31]
experience in getting approval of parcel
[1:49:33]
tax and school bonds and everything
[1:49:36]
else. And I think we as a group feel
[1:49:39]
that uh we can help generate support and
[1:49:43]
get this bond passed. And uh I anybody
[1:49:48]
who's taken a look at the plan seems to
[1:49:50]
be supportive so far. uh we all came
[1:49:53]
together in 30 minutes over Dan's first
[1:49:56]
iteration of this plan and and uh we
[1:49:59]
think we can bring the whole town
[1:50:00]
together and we appreciate all the
[1:50:03]
efforts you guys have put and time
[1:50:05]
you've put into all this and uh we're
[1:50:07]
here to help and the the Ross property
[1:50:11]
owners the friends of the firehouse the
[1:50:16]
Ross auxiliary
[1:50:18]
even the age friendly I think everybody
[1:50:21]
can unify and I uh as one town, as one
[1:50:24]
community, and get this thing passed.
[1:50:30]
Don't forget the Ross Historical Society
[1:50:32]
is going to be on this. Um, madame mayor
[1:50:35]
and council members, I'm happy to be
[1:50:37]
here tonight. Um, we all know it's
[1:50:40]
difficult to pass a twothirds bond
[1:50:42]
election, but I think there's two key
[1:50:44]
elements in to it. One is to avoid
[1:50:47]
controversy as much as you can and two
[1:50:50]
is to have an active proactive uh bond
[1:50:55]
uh outreach committee and with those I
[1:50:58]
think we can do it. Now, I give you an
[1:51:00]
example of how easy something can go
[1:51:03]
Whoops. can go uh south. And about 20
[1:51:07]
years ago, the Ross School went out with
[1:51:09]
a bond issue somewhat under $20 million.
[1:51:14]
And two of our council members tonight
[1:51:16]
know a lot about that because they were
[1:51:18]
on the school board at the time. Um
[1:51:21]
everything was cruising along very well
[1:51:23]
with the election. and all of a sudden
[1:51:25]
one landowner sent out a letter to all
[1:51:29]
the homeowner well to all the residents
[1:51:31]
in the town and um questioned the need
[1:51:35]
for remodeling the school and that
[1:51:38]
started uh people asking questions and
[1:51:42]
Ros School had never really had any
[1:51:44]
problems authorizing
[1:51:46]
uh like the parcel taxes.
[1:51:49]
So, out of the blue came this person
[1:51:52]
challenging everything and I think the uh bond election committee wasn't
[1:51:58]
ready to answer the questions. And so,
[1:52:01]
um sure enough, let's let's uh figure
[1:52:05]
out an a uh citizens advisory committee
[1:52:08]
and they formed one of 24 people, which
[1:52:10]
is way too many, 12 on each side. And
[1:52:15]
that committee, unlike our committee
[1:52:17]
that that I've worked with on this one,
[1:52:20]
that committee, there was acrimony.
[1:52:22]
There was
[1:52:24]
uh contentious behavior in the first
[1:52:26]
three or four meetings. And we met over
[1:52:29]
about a fourmonth I I just can't
[1:52:31]
remember
[1:52:33]
period, but about every other week. And
[1:52:36]
um after a while we kept talking about
[1:52:40]
the questions and it was a committee of
[1:52:42]
people that you find in Ross. Everybody
[1:52:45]
loves the town. They were just
[1:52:47]
questioning you know they wanted
[1:52:49]
information and so um after we met uh we
[1:52:54]
eventually wound up with a 23 to nothing
[1:52:57]
vote. Uh one person quit the committee
[1:53:00]
and we brought that back to the town
[1:53:02]
council. I mean the uh school board and
[1:53:05]
of course they approved it and we went
[1:53:07]
ahead and the citizens committee one of
[1:53:10]
the advantages of a citizen committee is
[1:53:13]
they study the issue beforehand so they
[1:53:15]
know all about it and
[1:53:19]
uh the bond measure passed I believe it
[1:53:21]
got a 75% yes vote that you might you
[1:53:26]
one of you might remember I think it
[1:53:28]
went from 62 or 3 to 75% and I hold that
[1:53:32]
Was the bond what what
[1:53:35]
>> just going to say I think the first time
[1:53:37]
was 59%.
[1:53:38]
>> Was what?
[1:53:39]
>> 59%. Right, Elizabeth?
[1:53:42]
>> Yeah, I don't remember. It didn't pass.
[1:53:44]
It didn't get 66.
[1:53:46]
>> Anyway, it passed. And so the two the
[1:53:49]
two things to take from this is uh it
[1:53:51]
can well it's three there's it can
[1:53:53]
happen in Ross but um try to avoid
[1:53:57]
controversy
[1:53:58]
and uh have a good uh citizens committee
[1:54:02]
program of educated people and proactive
[1:54:06]
and that's what we've proposed by the
[1:54:08]
way meetings uh table at uh the town
[1:54:12]
council I mean at the Ross post office
[1:54:15]
um printed information. Uh the the uh
[1:54:20]
property owners are going to hold a
[1:54:22]
public meeting if we need maybe at the
[1:54:25]
so uh and no matter what project we
[1:54:28]
choose I think you need to proceed on
[1:54:30]
that method. So um sure enough now the
[1:54:35]
situation is it's difficult to decide on
[1:54:38]
the project and it's because there are
[1:54:42]
big groups on both sides and nobody's
[1:54:44]
going to get a twothirds vote the way it
[1:54:46]
works now. So
[1:54:49]
our eightp person committee which was is
[1:54:52]
comprised of people that were both on
[1:54:54]
both leaning both ways on this issue and
[1:54:57]
a lot of strong support from the friends
[1:54:59]
of the fire station. But um we were we
[1:55:04]
were formed to come up with a viable
[1:55:06]
plan and uh
[1:55:10]
we can argue elements of the plan, but
[1:55:13]
what we need is a plan acceptable to
[1:55:16]
these diverse groups no matter what. We
[1:55:19]
need to we need to get that twothirds
[1:55:21]
threshold. And so you've heard about our
[1:55:24]
plan tonight and all the things that
[1:55:26]
we're uh you know recommending. It's a
[1:55:30]
beautiful structure. It it it attracts
[1:55:33]
us. It uh whatever problems can I think
[1:55:38]
the um
[1:55:40]
uh architects that you select can work
[1:55:43]
out all of those kinks. But what we need
[1:55:47]
what we really need is um or what the
[1:55:50]
town needs to move forward is a a
[1:55:54]
unanimous vote by the council on our
[1:55:56]
plan.
[1:55:58]
And I believe that um with unanimous and
[1:56:03]
vote and approval by the town council
[1:56:07]
um with the exceptional design and uh I
[1:56:10]
think popular appeal of the civic center
[1:56:13]
design and a very active bond outreach
[1:56:18]
committee. um we have an excellent
[1:56:21]
chance to pass the bond issue and I've
[1:56:23]
done 14 bond issues on voted bond
[1:56:27]
measures in Marin and uh that's kind of
[1:56:31]
what I found is the key and if we do
[1:56:34]
that and and pass the bond issue then we
[1:56:38]
will build an excellent
[1:56:40]
civic center building just like Ross
[1:56:42]
school did and built their fabulous
[1:56:45]
school building.
[1:56:48]
So that's it.
[1:56:57]
Okay. So last slide to summarize.
[1:57:01]
The project minimizes operational
[1:57:04]
disruption and construction time by
[1:57:06]
allowing the whole project to move
[1:57:07]
forward at once as opposed to in
[1:57:09]
multiple phases.
[1:57:11]
Vertical space is less expensive than
[1:57:14]
singlestory space and adding a second
[1:57:16]
story to the building is much less
[1:57:18]
expensive
[1:57:19]
than additional ground area.
[1:57:22]
Allows for two means of financing, one
[1:57:25]
for the town center and optionality for
[1:57:28]
future firehouse operations should we
[1:57:31]
desire. It
[1:57:33]
requires less site coverage and
[1:57:35]
environmental disruption, minimizing
[1:57:37]
hardscape and prompting other mitigation
[1:57:40]
risk.
[1:57:41]
uh work, excuse me, and allows planning,
[1:57:44]
building, and public works to remain in
[1:57:46]
place until the new facilities are ready
[1:57:49]
for occupancy, which will minimize both
[1:57:52]
costs and operational disruptions.
[1:57:54]
And that is the end of our presentation.
[1:58:00]
» Wonderful. Thank you all. It was really
[1:58:03]
terrific. We and we really appreciate
[1:58:05]
all the time and effort and
[1:58:07]
collaboration and creativity.
[1:58:11]
And I think now we'll have questions
[1:58:14]
from the council to the committee and
[1:58:18]
then we will um have questions to staff
[1:58:23]
if people have questions to staff. Then
[1:58:26]
we'll take public comment and then we
[1:58:29]
will bring it back and figure out what
[1:58:31]
our next steps are.
[1:58:34]
Questions? Elizabeth?
[1:58:36]
>> Um thank you very much. I I think the
[1:58:39]
plan looks beautiful. Um I have a couple
[1:58:42]
of quick questions. One is you'd
[1:58:44]
mentioned if we can't make the bond
[1:58:46]
measure if we can't make it for a
[1:58:48]
November bond that it could go on a June
[1:58:50]
ballot. Is is is that possible to have a
[1:58:53]
general obligation bond in a year that
[1:58:55]
doesn't have a general election? It's
[1:58:57]
2027
[1:59:00]
or do we need a special election for
[1:59:02]
that?
[1:59:03]
>> Uh
[1:59:05]
what? Go ahead. No. Go ahead.
[1:59:11]
» I I checked with our uh attorney's
[1:59:13]
office on that that question today and
[1:59:15]
yes, we can uh the the town council can
[1:59:19]
place a measure on the ballot a a geo
[1:59:21]
bond in um 2027. Um I would like to
[1:59:26]
clarify um the Marin County Office of
[1:59:29]
Elections, they don't there's not a June
[1:59:32]
date next year. Let me tell you what the
[1:59:34]
dates are. I did get those.
[1:59:36]
So, the dates are um in 2027 the the
[1:59:40]
special election dates because they
[1:59:42]
would all be called a special election
[1:59:44]
March 2nd, May 4th, August 31st, and
[1:59:49]
November 2nd. The May meeting and the
[1:59:52]
August meeting are um only vote by mail.
[1:59:56]
And um just to give you an idea of the
[1:59:59]
deadline. So if the council was going
[2:00:01]
to, you know, target the March 2nd, 2027
[2:00:05]
date, you would have to have all the
[2:00:07]
information to the county elections
[2:00:09]
office by December 4th. So it's a good
[2:00:13]
four months. Um you have to get the
[2:00:17]
information, take your action as a
[2:00:18]
council and get your information to the
[2:00:21]
um county elections office.
[2:00:23]
>> Thank you. Okay. I mean, I I I think I'm
[2:00:27]
hoping that it's possible for November,
[2:00:28]
but it's helpful to know that that it's not a whole another year to wait.
[2:00:33]
And then um for the um uh for the bays
[2:00:38]
and where um the paramedic, ambulance,
[2:00:41]
or fire engines, if we have any exit, is
[2:00:44]
this driveway being kept, you know, this
[2:00:47]
driveway between town hall and the uh
[2:00:51]
the town building? I couldn't tell from
[2:00:52]
the drawing if there's a little park
[2:00:54]
there or if it's if there's still an
[2:00:57]
exit right here.
[2:01:00]
>> Okay.
[2:01:02]
>> So, you can now those curve cuts.
[2:01:05]
>> Excuse me, Mr. We'd love to hear what
[2:01:07]
you have to say. You have to speak the
[2:01:08]
microphone
[2:01:10]
so the folks at home can hear.
[2:01:12]
>> I thought I was speaking loud enough
[2:01:14]
that everybody could hear. Um, no, which
[2:01:16]
>> I think the site needs to be developed,
[2:01:18]
but there clearly needs to be an
[2:01:19]
entrance and exit on both sides like
[2:01:21]
there is right now.
[2:01:22]
>> Okay.
[2:01:22]
>> And that was the intent and actually I
[2:01:24]
think the original plans that were sent
[2:01:26]
out to all of you did not show that and
[2:01:29]
then we were modified to actually pick
[2:01:31]
that up and included the redwood trees
[2:01:33]
that we would want to save here as well.
[2:01:35]
So, um, so yes, the answer is yes.
[2:01:39]
>> Okay, thank you. And then my only other
[2:01:41]
question is on slide 28 there you talk
[2:01:44]
about how we move forward appoint public
[2:01:46]
private working group uh led by the town
[2:01:48]
manager and duties determined by the
[2:01:50]
town manager and one question is is is
[2:01:53]
that the right process and and the
[2:01:55]
reason I ask is because we have a
[2:01:57]
committee right now that seems to be
[2:01:59]
doing an amazing job and I'm not sure if
[2:02:02]
you know I know Jeff you're leading it
[2:02:04]
if the if David Kelly is also part of it
[2:02:06]
and you're accessing the town manager
[2:02:08]
when you need her. I I'm not sure, but
[2:02:11]
it seems like, you know, this committee
[2:02:14]
has transcended politics and
[2:02:16]
personalities and has come up with a
[2:02:18]
plan. And I I'd kind of hate to rock the
[2:02:20]
boat. I mean, I'm happy to keep whatever
[2:02:23]
committee or leadership you have right
[2:02:26]
now because it's working. So, my
[2:02:28]
question is, why would we change that?
[2:02:30]
Why couldn't we just keep going right
[2:02:32]
now with what we have, accessing our
[2:02:35]
staff as we need them, the town manager
[2:02:38]
and the um uh project manager?
[2:02:41]
>> Well, I can tell you that this group is
[2:02:43]
very cohesive.
[2:02:44]
We pardon me. We would be delighted to
[2:02:48]
do that.
[2:02:51]
I mean, this group works.
[2:02:54]
>> Yeah. Yeah. And I think I think it's I
[2:02:55]
think at the I you know ideally it's working together here right because
[2:03:00]
there are things that we can do
[2:03:02]
resources people that we can bring to
[2:03:04]
the table. You know we were looking at
[2:03:06]
say scope of work or evaluating
[2:03:09]
consultant agreements or whatever it
[2:03:11]
might be um to assist Christa and the staff in terms of being able to
[2:03:16]
bring more people to the table when it's
[2:03:18]
needed. And I think that all of us all
[2:03:20]
of us are willing to do that. I mean, I wouldn't have said that necessarily
[2:03:24]
think that going in, but I think after
[2:03:26]
working together for almost three months
[2:03:28]
that, you know, we have a lot of value
[2:03:30]
that we could bring to the table.
[2:03:33]
>> Thank you.
[2:03:41]
» With respect to the the timeline, I
[2:03:44]
appreciate that that timeline. I I have
[2:03:48]
to tell you my impression is that's I I
[2:03:50]
wonder how re realistic that is just
[2:03:52]
based on my experience uh both in the
[2:03:55]
private real estate development area but
[2:03:57]
also as a homeowner in Ross we were once
[2:04:00]
told for a survey we're looking at six
[2:04:03]
months to a year just because there were
[2:04:04]
so few surveyors. So I I mean is I
[2:04:10]
wonder if anyone could comment on this
[2:04:12]
particularly Dan, you know, as an
[2:04:13]
architect. I mean, do you really think
[2:04:15]
we could have a site plan within this
[2:04:17]
period of time and that these other
[2:04:19]
things could come together?
[2:04:20]
>> You want to comment? Well, I I'll maybe
[2:04:22]
take a little bit of this. Uh you're
[2:04:25]
right in terms of you know resources and
[2:04:28]
availability but we all have large firms
[2:04:31]
and we all have large operations and we
[2:04:33]
have a lot of clout and we can push
[2:04:35]
people pretty hard to get things done.
[2:04:38]
>> And it's true. I mean look at we got two
[2:04:41]
really great really great construction
[2:04:43]
estimates really good people took their
[2:04:45]
time to do this because they're partners
[2:04:48]
of ours across you know many different
[2:04:50]
projects and such. I I that it is a
[2:04:52]
really aggressive it is an aggressive
[2:04:54]
timeline. I think that you know if you
[2:04:57]
were to look for it a June bond for
[2:04:59]
instance I think the question becomes
[2:05:03]
how do we break up the work because what
[2:05:05]
I would hate to and something we'd have
[2:05:07]
to talk about but if you hire an
[2:05:09]
architect that does all the drawings and
[2:05:11]
you pay for all the engineers and all
[2:05:13]
the architect and get everything done
[2:05:15]
and you can even go get it send it out
[2:05:17]
to bid and get numbers for the bond
[2:05:19]
potentially.
[2:05:20]
What if it doesn't pass? And then all of
[2:05:23]
a sudden we've got a lot of sunk cost
[2:05:26]
that potentially I think it will pass
[2:05:30]
and I'm certainly optimistic about that
[2:05:32]
and we would throw our weight and
[2:05:33]
everybody in the town behind it, but it
[2:05:36]
may not. And so maybe it still might
[2:05:38]
force us to break it up into pieces. I
[2:05:40]
also think that the other issue is is
[2:05:43]
EMS and the contract and they sort of
[2:05:47]
run concurrently here and you're you're
[2:05:50]
trying to get some things done because
[2:05:51]
in a way you're going to want to
[2:05:53]
renegotiate some other things
[2:05:55]
potentially, but you could tell a story
[2:05:57]
where you're going to pro provide them a
[2:05:59]
facility that's a you know wonderful
[2:06:02]
facility and access to things that they
[2:06:04]
wouldn't have if they did this
[2:06:05]
separately. So there's a lot of moving
[2:06:07]
parts, but it is it is a pretty
[2:06:10]
aggressive schedule overall. It is.
[2:06:12]
>> And then one other question in terms of
[2:06:15]
the list of things that that we were
[2:06:18]
told we should get going on. Uh has any
[2:06:22]
thought been given to whether we should
[2:06:23]
have some sort of geotechnical study or
[2:06:26]
analysis given that this is near a creek
[2:06:29]
that it's in a known liquefaction zone?
[2:06:31]
>> Yeah, I think it's a good question. we
[2:06:35]
probably would do a limited number of
[2:06:38]
soil borings. Um, however, and I think
[2:06:41]
it would be if we were doing more work
[2:06:44]
that was closer to the creek, I'd be
[2:06:47]
much more concerned about it. But I
[2:06:50]
think if we open up those buildings and
[2:06:52]
look at some of the foundations
[2:06:54]
underneath and see if there's been any
[2:06:56]
settling over a hundred years, that's
[2:06:58]
going to give us a pretty good idea what
[2:07:00]
this substrate looks like. But I would
[2:07:03]
still say yes, we're going to have to
[2:07:04]
get a geotech in here and and do some
[2:07:07]
investigative work just to see if there
[2:07:08]
is something that we're not aware of.
[2:07:10]
>> Is is that something the town should be handling or with the
[2:07:14]
>> architect? No matter what, we'll have to
[2:07:16]
do it. I think the only question is
[2:07:19]
depending upon the route that we go, the
[2:07:22]
location of the buildings are going to
[2:07:23]
have an impact on where we do the
[2:07:25]
borings. You're not going to want to do
[2:07:26]
a soil boring in a place where we're not
[2:07:29]
going to have a building. And so I think
[2:07:30]
we, you know, again, it's let's get some
[2:07:32]
planning done, get something, and then
[2:07:34]
decide to go in and start doing some of
[2:07:36]
the we could do some preliminary soils
[2:07:38]
testing, but not necessarily spend the
[2:07:40]
money on doing complete porings.
[2:07:46]
» I I really love the conceptual design
[2:07:49]
and plan. It's beautiful. Um, a couple
[2:07:52]
questions. I think you may have
[2:07:53]
addressed it, but I just want to be
[2:07:55]
sure. parking and circulation within the
[2:07:58]
space. Is it adequate?
[2:08:00]
the park um
[2:08:01]
>> parking is it adequate and will
[2:08:04]
>> well I guess my answer to that question
[2:08:06]
would be based on the plan that has been
[2:08:08]
approved
[2:08:10]
uh assuming that was adequate the plan
[2:08:12]
that we're bringing forward would have
[2:08:14]
the ability to have more parking
[2:08:17]
because there's less site work right
[2:08:19]
it's more open we're basically
[2:08:20]
condensing the building and going up and
[2:08:22]
so consequently there's less sight
[2:08:24]
coverage which would allow us to do and
[2:08:26]
I if we would have had a survey would
[2:08:28]
have been a lot I could start doing
[2:08:30]
layouts and stuff, but
[2:08:32]
>> it just didn't make a lot of sense
[2:08:33]
without having really adequate
[2:08:35]
information. But it also potentially
[2:08:37]
could take areas like this area right
[2:08:40]
now, which is sort of a dead area of
[2:08:42]
this building because the the question
[2:08:45]
is in terms of access, people coming in,
[2:08:47]
they're going to have to go up Sir
[2:08:48]
Francis Drake and come in the center. we
[2:08:50]
could actually develop it so that
[2:08:52]
there's a double entry that comes into
[2:08:54]
the site and potentially look at some of
[2:08:56]
the areas over here for open areas and
[2:09:00]
patio areas and other community kinds of
[2:09:03]
small group activities. And so I think
[2:09:05]
that site development piece of it I I
[2:09:08]
think again based on the you know master
[2:09:12]
plan that's approved I would say yes I
[2:09:13]
would say we probably can get more but I
[2:09:15]
think we still have to go through the
[2:09:17]
process of of detailed planning. Yeah, I
[2:09:19]
was thinking if if the those back bays,
[2:09:22]
if that area is for community um events
[2:09:27]
or you've got a community center, there
[2:09:29]
may be more people coming in than just
[2:09:32]
the staff that are working here or the
[2:09:34]
police and the and the paramedics.
[2:09:36]
>> Yeah. So,
[2:09:38]
>> yeah.
[2:09:39]
>> Um another question. Um, I know you
[2:09:43]
didn't uh talk to the police or the um
[2:09:48]
public works staff about the space that
[2:09:51]
they need. And I think about public
[2:09:52]
works, they they have a new is it a new
[2:09:56]
lawn mower or something that's coming,
[2:09:58]
new tractor? It's like where where are
[2:10:00]
we going to put these things? Have you
[2:10:01]
thought about that and what in the
[2:10:04]
design?
[2:10:04]
>> Um, the answer is yes and and no, right?
[2:10:08]
So the yes side of it is is certainly we
[2:10:11]
saw a number of things in the program
[2:10:13]
that in all likelihood should not be in
[2:10:16]
that larger structure and a lot of it
[2:10:19]
had to do with public works the shop
[2:10:20]
area equipment sort and some other
[2:10:23]
things. I think that the fact that again
[2:10:26]
we're condensing it into one building,
[2:10:28]
we have the ability to do a separate
[2:10:30]
small public works maintenance and shop
[2:10:32]
area because in all likelihood just
[2:10:35]
based on the function of those
[2:10:37]
particular areas, you probably wouldn't
[2:10:39]
want it in the building. But we didn't have the time and we didn't
[2:10:44]
really sit we really need to sit down
[2:10:46]
with everybody and Christa and the staff
[2:10:48]
have done that. The program looks really
[2:10:50]
good. There's a lot of clarification
[2:10:52]
work that needs to be done, but detailed
[2:10:54]
layouts are the next step to make sure
[2:10:56]
that everything works. And this building
[2:10:58]
is as, you know, as nice as it is
[2:11:01]
conceptually, it'll change from this.
[2:11:04]
It's got to change from this. This is an
[2:11:05]
idea that we need to, you know, start
[2:11:07]
building on potentially.
[2:11:09]
>> And if I could address the police
[2:11:11]
station issue,
[2:11:13]
>> um, I've had multiple conversations with
[2:11:15]
Chief Am
[2:11:18]
or ex-chief
[2:11:20]
um he knows it solid right now. The new
[2:11:25]
chief doesn't know the building nearly
[2:11:27]
as much as he does. Right. So I asked
[2:11:30]
our just departed chief if he'd be
[2:11:33]
willing to consult over the phone or in
[2:11:35]
meeting with us starting next week. And
[2:11:37]
he said anytime you want. Is he still
[2:11:40]
here?
[2:11:42]
>> Right.
[2:11:42]
>> Yeah. That was anytime you want while I
[2:11:45]
was employed by the city itself. So
[2:11:49]
>> might come with the cost, but we'll
[2:11:51]
talk.
[2:11:51]
>> I know you do. I know you do. And what's
[2:11:53]
the what's the book you said you were
[2:11:55]
going to give us?
[2:11:57]
>> Uh is this the proper the appropriate
[2:11:59]
time to speak? So there's so so there's
[2:12:02]
rules for police departments. I haven't
[2:12:04]
heard any of that in this conversation
[2:12:05]
tonight. There's the International
[2:12:07]
Association for Chiefs of Police has a
[2:12:09]
guideline of what your police department
[2:12:11]
needs to look like and have the peace
[2:12:13]
officer standards of training in
[2:12:15]
California tells you what you need to
[2:12:17]
have for a police station. So when I
[2:12:20]
hear about the site and things like
[2:12:21]
that, be prepared for this number to go
[2:12:24]
up because there are some very expensive
[2:12:26]
things. Police departments aren't cheap,
[2:12:28]
fire departments aren't cheap, paramedic
[2:12:30]
buildings aren't cheap, but we have some
[2:12:32]
really specific stuff and we can't share
[2:12:34]
some of those things. Uh, the Department
[2:12:36]
of Justice regulates who comes and goes
[2:12:38]
and where they come and where they go.
[2:12:40]
>> Uh, we've got computers with people's
[2:12:42]
personal information. I mean, I'm kind
[2:12:43]
of preaching to the choir. I know it's a
[2:12:45]
beautiful looking building. I just worry
[2:12:47]
that it's not going to function for the
[2:12:49]
stuff that we need to do our job.
[2:12:51]
>> Um, and most importantly,
[2:12:54]
>> especially if you're going to have a
[2:12:55]
housing element here, um, you can't have
[2:12:58]
an escaped prisoner running through your
[2:12:59]
housing element. You need a secure area
[2:13:02]
to get them in and out of your building.
[2:13:04]
Same with the police officers. You need
[2:13:06]
a secure way to get them in and out. And
[2:13:07]
you need a secure in a discrete place
[2:13:10]
for victims of of crimes to come in and
[2:13:13]
out of the lobby. Um, you know, we get
[2:13:16]
we believe it or not, we we get that
[2:13:17]
here in Ross. We don't advertise. Um,
[2:13:20]
but but we do get that here in Ross. So,
[2:13:22]
these are all things that I'm happy to
[2:13:24]
share with you guys. And and there's guys that are bigger experts
[2:13:27]
than I am, but I've lived in your
[2:13:29]
building for five years. Um, I've been
[2:13:32]
here when we we it's like it's like a
[2:13:34]
fire drill for us to get the one police
[2:13:37]
officer and me that comes in on my day
[2:13:39]
off to move cars from your parking lot
[2:13:43]
and try to find parking either at Marine
[2:13:46]
Art and Garden Center or up on Laurel
[2:13:48]
Grove just so that we can get to our
[2:13:49]
cars because we're worried about
[2:13:51]
flooding. You know, been lucky. Hasn't
[2:13:53]
really happened a lot. happened once
[2:13:55]
when I was here. But still, the idea of
[2:13:57]
doing that and that takes us away from
[2:13:59]
the things that we really should be
[2:14:00]
doing like maybe evacuating residents or
[2:14:02]
doing traffic control. Um, these are all
[2:14:05]
considerations. And while I've worked in
[2:14:08]
this building for five, I've lived
[2:14:09]
through a rehab at the Sanfell Police
[2:14:12]
Station. Um, Chief Aguilar has lived
[2:14:15]
through the rehab at the Sanfell Police
[2:14:17]
Station. Um, it's a lot of work and you guys just should be prepared for
[2:14:22]
your numbers to go up and for this the
[2:14:25]
size to change a little bit at least.
[2:14:28]
So, anyway, there's pros that do this.
[2:14:30]
I'm I'm just I'm an expert only because
[2:14:32]
I use the property.
[2:14:34]
So, I'm happy to help you with whatever
[2:14:37]
else you might need.
[2:14:38]
>> We'll fix it.
[2:14:39]
>> Yeah.
[2:14:39]
I think that um
[2:14:42]
first of all, I think probably many of
[2:14:45]
you know my wife was in law enforcement
[2:14:47]
for 45 years. So the last thing I would
[2:14:49]
ever want to do is to short change the
[2:14:52]
police department, right? But I think
[2:14:55]
right now what we did is we blocked out
[2:14:58]
3,000 square feet. And the 3,000 square
[2:15:00]
feet in terms of functional needs is
[2:15:03]
defined in the program. And it is a
[2:15:05]
secure 3,000 foot area. It doesn't mean
[2:15:08]
that we have all the answers yet. We
[2:15:09]
certainly don't, but that block of space
[2:15:12]
is based on the program. So, and that's
[2:15:15]
a very clean square block of space. So,
[2:15:17]
consequently, I would think that we can
[2:15:20]
um meet all your all your needs and and
[2:15:23]
ultimately I think that pertains to
[2:15:25]
everybody. It pertains to public works
[2:15:26]
and the office space and staff and that
[2:15:28]
sitting down and working through these
[2:15:30]
things and trying to understand
[2:15:32]
compromises that could be made or should
[2:15:35]
be made or other kinds of things,
[2:15:37]
opportunities we can look at.
[2:15:38]
>> Yeah. I I I think you guys are on the
[2:15:40]
right track. I don't I don't think it's
[2:15:42]
impossible. Um size-wise, I think just
[2:15:46]
making all the pieces fit. Um I've lived
[2:15:49]
through I've said this before. It's kind
[2:15:51]
of I've lived through architectural
[2:15:52]
Tetris. It didn't really work out. Uh we So I like that you're considering,
[2:15:59]
you know, more space. I think that's
[2:16:00]
good. But I really do think that the
[2:16:02]
access is going to be huge for us. And
[2:16:05]
um and thank you for for everything. I
[2:16:08]
appreciate it. Is there any Tom Andrew?
[2:16:10]
Is there anything you need from me or
[2:16:12]
anybody else?
[2:16:13]
>> Well, um, thank you, Chief. Well, the council could very well have
[2:16:18]
questions for you.
[2:16:18]
>> I'll stick around.
[2:16:19]
>> Yeah.
[2:16:22]
>> Is it I don't want to take everybody's
[2:16:24]
time. Okay. So,
[2:16:28]
when would we really have an idea of
[2:16:30]
what the pretty true costs would be for
[2:16:33]
a geo bond?
[2:16:34]
>> I'm sorry. When would we really have a
[2:16:36]
good idea of what the cost? I mean,
[2:16:39]
Chief P is saying it's gonna cost going
[2:16:41]
to cost a lot more than you think. And
[2:16:44]
when you take a look at a at closer to
[2:16:48]
the structure, we may find that there's
[2:16:50]
things that we didn't under under we
[2:16:52]
didn't know or understand that would be
[2:16:53]
a problem. When are we going to know
[2:16:55]
what the real cost is going to be?
[2:16:57]
Because that affects how much we are
[2:16:59]
asking for in the geo bond.
[2:17:02]
>> No, I get that. But if your question is, it more difficult to go above 10
[2:17:06]
million than 20 million? No, it's not
[2:17:09]
difficult at all.
[2:17:11]
>> I'm just thinking if we say, okay, it's
[2:17:13]
going to be 10 million and the geo bond.
[2:17:17]
We issue the geo bond, but it ends up
[2:17:19]
being it's going to cost us more than
[2:17:21]
that. It's going to end up so people
[2:17:23]
vote, they say yes, twothirds, and then
[2:17:25]
we say, well, it wasn't quite enough. We
[2:17:27]
need another three million.
[2:17:30]
Okay. So, the town has 12 point
[2:17:33]
something million squirrel away,
[2:17:36]
>> right? And we're talking about a project
[2:17:38]
that is it 22 23 maybe 25 million. And
[2:17:43]
so, we need another 125.
[2:17:46]
If you start with 10, an additional 125
[2:17:49]
is no big deal. It really isn't.
[2:17:53]
>> Yeah. Maybe I could answer that
[2:17:55]
potentially too from a different
[2:17:56]
perspective. So, and I'll look at all my
[2:18:00]
developer friends in the including Bill
[2:18:02]
back there. Um, you know, when we do
[2:18:05]
projects and they're going for
[2:18:07]
financing, they got a budget. We got to
[2:18:08]
stick to the budget and you got to
[2:18:10]
figure out how to do that. But in order
[2:18:13]
to do that, you have to have enough
[2:18:15]
information developed so that you can
[2:18:17]
get a number that you can really hang
[2:18:19]
your hat on. And so the answer to the
[2:18:22]
question I think is you know multiaceted
[2:18:26]
in the sense that if you were to get an
[2:18:28]
architect on board a good architect
[2:18:30]
could do the schematic design and run
[2:18:32]
concurrently with cost estimator within
[2:18:35]
three months and have a number that
[2:18:38]
would include I think pretty much every
[2:18:40]
aspect of the project that we'd be
[2:18:41]
concerned about. Everything from AV
[2:18:44]
equipment furniture fit out everything
[2:18:47]
right. Um, but that would mean if you're
[2:18:50]
trying to, you know, if you're trying
[2:18:52]
for a bond in the fall, that means that
[2:18:54]
you'd have to have an architect on board
[2:18:55]
by June. June, July, June, July, August,
[2:19:00]
three months, which means that you have
[2:19:01]
a month, Kristen staff has a month to
[2:19:04]
they got to conduct interviews. They got
[2:19:06]
RFQS and RFPs. And so I think
[2:19:09]
realistically,
[2:19:11]
you know, I think we could do it, but
[2:19:13]
realistically probably June. But then
[2:19:15]
the question is how much work do we do
[2:19:18]
between now and June and how much money
[2:19:20]
do we spend that to get us to because we
[2:19:23]
could do this in three months and maybe that's the first step get the
[2:19:27]
architects on board whatever that
[2:19:29]
three-month time frame is get a number
[2:19:32]
then and then really take a look at the
[2:19:34]
bond situation that we're developing in
[2:19:37]
June and then if we're comfortable that
[2:19:40]
we believe that we can get a pass then
[2:19:42]
continue with the drawings at that point
[2:19:43]
in time But don't commit to doing
[2:19:46]
everything until we have a much better
[2:19:48]
understanding of what the overall scope
[2:19:50]
looks like.
[2:19:51]
>> Okay. Thank you.
[2:19:54]
>> Yeah, I noticed that in the um project
[2:19:57]
timeline that I think Bob was
[2:20:01]
presenting, it looks like in that
[2:20:04]
diagram, the costing isn't done until
[2:20:06]
September of 2026.
[2:20:09]
Um, and we would need to file that
[2:20:12]
information in early August for the
[2:20:15]
general obligation bond
[2:20:18]
to give give the the amount that we're
[2:20:21]
seeking from the voters. So, it it seems like maybe March of 2027
[2:20:28]
might be more realistic to do a thorough
[2:20:31]
job. we had to go back and ask the
[2:20:34]
voters for a supplement when we did the
[2:20:36]
school bond and that's not something
[2:20:38]
that we want to do. Um
[2:20:42]
so
[2:20:44]
Matt, do you want to ask questions or
[2:20:45]
should I go ahead? Um,
[2:20:50]
I know you've said that if the council
[2:20:53]
endorses this plan, um, that the friends
[2:20:57]
of the Ross Firehouse will withdraw
[2:20:59]
their initiative and but it seems like
[2:21:02]
there's a lot of moving parts. Um,
[2:21:04]
there's a lot of stuff that still needs
[2:21:06]
to get done. we're, you know, figuring
[2:21:08]
out where there's going to be secured
[2:21:10]
parking for the police, um the public
[2:21:12]
works yard, um the the detailed
[2:21:16]
programmatic issues, etc., etc. Um so,
[2:21:19]
I'm wondering how, you know, how firmly
[2:21:24]
um do we need to endorse this plan? It
[2:21:27]
seems like it's going to be iterative. I
[2:21:29]
think I think we're all very much in
[2:21:31]
favor of the concept, the conceptual
[2:21:34]
design. I think the building is
[2:21:36]
beautiful, but I'm wondering, you know,
[2:21:38]
what is that sweet spot where where
[2:21:41]
you're going to get endorsement and
[2:21:43]
commitment from us and you're going to
[2:21:45]
feel like, okay, we're going to we're
[2:21:48]
going to withdraw the initiative because
[2:21:50]
we have confidence that this is the
[2:21:51]
direction that the council's going.
[2:21:54]
>> I could take it. U August August 8th is
[2:22:00]
the deadline to withdraw the ballot
[2:22:02]
initiative. So really, town council just
[2:22:05]
needs to adopt our plan as a new master
[2:22:07]
plan by August 8th. So that gives you
[2:22:10]
what is that three months? May, June,
[2:22:12]
July. Gives you three months. Get your
[2:22:14]
schematics, get your costing.
[2:22:17]
You need to adopt the plan before August
[2:22:19]
8th or or we won't withdraw our ballot
[2:22:21]
initiative. That that's for certain. Um
[2:22:23]
so you guys got to come together and
[2:22:25]
make that decision by then.
[2:22:29]
>> Okay. Okay, I'm going to have a question
[2:22:31]
for the staff then about how realistic
[2:22:33]
that is. Um,
[2:22:38]
and and I'm wondering in your plan,
[2:22:42]
um, there's space for fire, but I'm
[2:22:47]
wondering, are you intending for us to
[2:22:50]
spend money to build out
[2:22:53]
facilities for fire? Or is this just
[2:22:56]
space that could be used later if
[2:23:00]
funding to operate the fire station is
[2:23:03]
somehow secured down the road?
[2:23:06]
The ladder.
[2:23:08]
So we would not be spending money to
[2:23:11]
build out a fire station. It's not build
[2:23:14]
it and they will come.
[2:23:16]
>> No, no, we wouldn't. No, we wouldn't
[2:23:17]
have to. I think I think when we go back
[2:23:20]
and take a look at the program, what we
[2:23:22]
need to understand is is how can we
[2:23:25]
bring together certain elements and is
[2:23:27]
it possible that some of those elements
[2:23:29]
could be shared, fitness facility,
[2:23:32]
locker, men and women's locker rooms,
[2:23:35]
toilet areas, other kinds of things that
[2:23:37]
show up in different aspects of the
[2:23:38]
program. So, I think that and and quite
[2:23:41]
frankly, everything that we've been
[2:23:42]
looking at in terms of fire side of it,
[2:23:45]
it's really primarily residential. It's
[2:23:48]
really primarily the bunks. There's not
[2:23:50]
a lot of other things that will really
[2:23:51]
push a very large square footage. So, I
[2:23:54]
think that um we would be doing the
[2:23:56]
planning for it, but we wouldn't be
[2:23:58]
spending I don't think we should be
[2:24:00]
spending any money until we know exactly
[2:24:02]
where we're going with it. But from a
[2:24:04]
planning standpoint, certainly you could
[2:24:05]
do it and you could do it, design it in
[2:24:07]
a way that if it didn't pass, then it
[2:24:09]
could become something else. So I think
[2:24:11]
where it's located, how it's organized
[2:24:14]
makes a big difference in terms of
[2:24:16]
giving us the ability to move forward in
[2:24:18]
a reasonable way so that we have the
[2:24:20]
flexibility using it for one thing
[2:24:22]
versus another.
[2:24:26]
» Matt, do you have questions?
[2:24:28]
>> First of all, I want to say thank you to
[2:24:31]
this committee for putting forth a
[2:24:33]
really just beautiful plan and really
[2:24:36]
showing that the impossible actually is
[2:24:39]
possible. So my first question is is
[2:24:42]
really for you uh Dan. I um you know
[2:24:45]
being on this council and going through
[2:24:47]
this whole what I would say Misha Goss
[2:24:50]
as a Jew uh is that I was told that you
[2:24:54]
know you got to trust the experts. You
[2:24:55]
really you're not listening. You I got
[2:24:57]
to trust the experts. And you were one
[2:24:59]
of those experts who um said that this
[2:25:02]
building could not was not a candidate
[2:25:04]
for adaptive reuse. And so I'm I'm just
[2:25:06]
curious if you could share your own um
[2:25:11]
experience kind of from the letter you
[2:25:13]
sent the council in July to this plan
[2:25:15]
today, how you got to this conclusion
[2:25:18]
that it could be uh an adaptive reuse
[2:25:20]
project. Yeah, I think it I think it's
[2:25:23]
part of what you know because I wrote
[2:25:24]
that letter and and I understand I went
[2:25:27]
back and read it and I could see how the
[2:25:28]
some of the misunderstanding might occur
[2:25:31]
when when we did that study back in
[2:25:35]
2000.
[2:25:37]
We were going to move the whole building
[2:25:39]
out of the flood plane, which meant the
[2:25:41]
whole including the front of the
[2:25:43]
building, the criteria was to raise that
[2:25:45]
up even higher at the time. when you
[2:25:48]
were looking at that, the cost
[2:25:50]
associated with putting a new building
[2:25:52]
up was cheaper than doing a renovation
[2:25:56]
at that point. So, I think that whenever
[2:25:59]
you're getting into a renovation project
[2:26:01]
and it's and I it I think I was
[2:26:04]
misunderstood because any building can
[2:26:06]
be renovated. Um I'm in the middle of I
[2:26:10]
just did one personally on the National
[2:26:12]
Historic Register up in Oregon. It took
[2:26:14]
us four my wife and I four and a half
[2:26:16]
years. should have been torn down and
[2:26:18]
rebuilt. I could have torn it down and
[2:26:20]
rebuilt it for less money than it cost
[2:26:22]
to do the renovation work, but it's on
[2:26:26]
the National Historic Register. It was a
[2:26:28]
really important building in town. There
[2:26:31]
are a lot of compelling reasons to do it
[2:26:33]
anyways. And I and as I said, I think
[2:26:36]
that this building is probably going to
[2:26:39]
cost same as a new building, but there's
[2:26:40]
a lot of other compelling reasons to
[2:26:42]
keep aspects of it, portions of it. And
[2:26:46]
I think that that so it wasn't it can't
[2:26:48]
be renovated. Of course it can be
[2:26:49]
renovated, but I think ultimately as I
[2:26:52]
said before, what we're going to end up
[2:26:53]
with essentially is a new building.
[2:26:55]
>> Yeah. No, no, I understand. I just want
[2:26:57]
to be very clear because part of the
[2:26:58]
letter said structural framing is
[2:27:00]
completely inadequate to meet seismic
[2:27:02]
codes. So there were there had been some
[2:27:04]
criticism that this building the
[2:27:07]
foundations it could not support the
[2:27:10]
essential services act. I I just I I
[2:27:12]
this is so important because we were
[2:27:14]
told repeatedly over and over through
[2:27:17]
this process this this area this
[2:27:19]
envelope had to be completely raised
[2:27:22]
because there was no cap there was no
[2:27:24]
capability under any circumstance that
[2:27:27]
it structurally could support a modern
[2:27:30]
firehouse police etc.
[2:27:31]
>> Um
[2:27:33]
well I'm not sure that's true. I don't
[2:27:35]
think that that isn't what I was it is
[2:27:37]
well it isn't true and there and there
[2:27:39]
are two things that are one is true is
[2:27:42]
that seismically it's not anywhere near
[2:27:44]
up to code so sheer walls all sorts of
[2:27:48]
potentially foundation reinforcement
[2:27:50]
work there's a lot of mitigation work
[2:27:52]
that we might have to do we won't know
[2:27:54]
until we actually get into the project
[2:27:56]
but there's also ways to circumvent that
[2:27:58]
we don't necessarily have to do grade
[2:28:01]
you know foundation walls we could do
[2:28:03]
columns and beams So there's always a
[2:28:06]
workaround, right? And I think that, you
[2:28:09]
know, again, going back to, you know,
[2:28:11]
when we look at it originally, it was a
[2:28:14]
pro bono kind of thing. We went in
[2:28:16]
there, we did it almost exactly what
[2:28:18]
we're doing now, but a much shorter time
[2:28:20]
frame. And and the question at that
[2:28:22]
point is, is it cheaper to build a new
[2:28:24]
one and take this one down or not? And
[2:28:28]
our answer was it's probably cheaper to
[2:28:30]
build a new one. But our position was at
[2:28:32]
that time reuse portion of this building
[2:28:36]
in a way that if you do something new,
[2:28:38]
it still has the integrity of what was
[2:28:41]
there before.
[2:28:42]
>> Okay. So just to be to clarify, there's
[2:28:45]
nothing structurally wrong
[2:28:48]
>> with with with what this plan in terms
[2:28:50]
of supporting an you know essential
[2:28:52]
services act, police, fire, paramedic.
[2:28:56]
in your view based on what you have seen
[2:28:59]
and
[2:29:00]
>> I'll clarify that because it's it's not
[2:29:02]
that we the existing structural system
[2:29:06]
no doubt does not meet code but we can
[2:29:10]
reinforce that structural system to meet
[2:29:13]
code
[2:29:13]
>> okay
[2:29:14]
>> shear wall steel whatever we need to do
[2:29:16]
we can we can certainly make that happen
[2:29:18]
>> okay so question two has to do with the
[2:29:21]
programming for uh a working modern fire
[2:29:25]
and paramedic facility
[2:29:27]
So, I know we just heard some questions
[2:29:29]
about the the ballot initiative. Your plan here says that you can
[2:29:35]
completely build a modern working fire
[2:29:39]
and paramedic facility here
[2:29:41]
>> and that you have the right square
[2:29:42]
footage to do that.
[2:29:45]
>> That's all we know. Yeah. At this point,
[2:29:46]
yes, the answer is yes. And if we don't
[2:29:49]
have enough area, there are
[2:29:51]
possibilities in adding additional area
[2:29:53]
to the building if we need to. But based
[2:29:55]
on our outlook, we have 2,000 square
[2:29:57]
feet more. It doesn't mean that it's
[2:29:59]
going to plan as efficiently as the
[2:30:01]
original master plan, the approved
[2:30:03]
master plan. But I believe that yes, we
[2:30:06]
can accommodate it. And this next step,
[2:30:08]
this next three-month effort of
[2:30:10]
schematic design will tell us that we'll
[2:30:13]
have much.
[2:30:14]
>> Sorry. And that schematic design is
[2:30:15]
basically to design a working modern
[2:30:19]
fire, paramedic, police
[2:30:22]
>> facility. and and working modern staff
[2:30:25]
offices and police department and
[2:30:28]
because this to me is is the the fire
[2:30:31]
piece of it is a critically important
[2:30:32]
piece, but this is a really important
[2:30:36]
building for everybody, right? So, we
[2:30:38]
got to talk about all the operations and really bring all of it all of it
[2:30:43]
together. But the answer is yes.
[2:30:45]
>> Yeah. So, because there's been a lot of
[2:30:47]
critical commentary that it cannot
[2:30:50]
support that. Yeah.
[2:30:51]
>> So that's why there was no fire because
[2:30:53]
it could not do everything that you're
[2:30:56]
saying it can do, which is there's not
[2:30:58]
enough room and the the building is too
[2:31:00]
small and the envelope was too small to
[2:31:03]
support all of these functions that
[2:31:04]
you've now said that we can. So I I just
[2:31:07]
again would love for you to confirm the
[2:31:10]
goal is to program this to support all
[2:31:13]
those functions and you believe that it
[2:31:15]
can do that.
[2:31:17]
>> Yes.
[2:31:18]
>> Okay. Thank you.
[2:31:18]
>> There you go. So, the last thing is I
[2:31:21]
brought my favorite flyer of all time,
[2:31:24]
which is the 2020 Town of Ross flyer
[2:31:28]
that went out to all residents about
[2:31:30]
what why we could not have a fire
[2:31:32]
station. And when it says, "What are the
[2:31:34]
choices on the back?" It says, "For 14.6
[2:31:38]
million, we can relocate our fire staff
[2:31:40]
to a neighboring station and not rebuild
[2:31:42]
the fire station. For 28.4 million, we
[2:31:46]
can rebuild the fire station." So like
[2:31:48]
double the cost.
[2:31:50]
>> The plan that you have brought forward
[2:31:52]
today is 23 million. It's even this 14.6
[2:31:56]
million according to the latest estimate
[2:31:59]
is now 25 million for this original
[2:32:02]
concept. And you're saying you can build
[2:32:05]
a fire station and do all of this for 23
[2:32:09]
which is even less than the town flyer
[2:32:11]
from 2020 said. How is that possible?
[2:32:13]
Well, I don't first of all I don't know
[2:32:16]
because I have no idea what you're
[2:32:17]
referring to. I think that in all the
[2:32:20]
conversations that we've had that I
[2:32:24]
think maybe and I think possibly Bob can
[2:32:27]
speak to this that the criteria that we
[2:32:29]
were looking at in terms of a fire
[2:32:31]
station, the number of people that we
[2:32:33]
were going to have, how it was going to
[2:32:34]
be staffed, how it was going to be
[2:32:36]
functioned, how it was going to function
[2:32:38]
is different than what I think we've
[2:32:40]
been talking about over the last two or
[2:32:42]
three months. It is a fire operation,
[2:32:44]
but it isn't a full-blown fire station.
[2:32:48]
That's Bob. I don't know whether
[2:32:50]
>> Yeah, it'd be helpful because this this is was the crux in the matter in
[2:32:54]
2020.
[2:32:55]
>> They said, well, we you know, for 14
[2:32:57]
million versus doubling the price, you
[2:32:59]
know what? We can't afford that. But
[2:33:02]
your plan you're coming forward with
[2:33:04]
today is even less than this original
[2:33:07]
even with all the inflation that we So
[2:33:10]
it and this is just to build it. This is
[2:33:12]
not operate it. This is just to build
[2:33:14]
it, which it said at the time was going
[2:33:16]
to be double. So, I I just I want to
[2:33:18]
make sure because so many people are
[2:33:20]
I've heard,
[2:33:22]
>> we can't afford to build it. We cannot
[2:33:24]
afford to build a fire station. We can't
[2:33:26]
afford to build it. But this plan you're
[2:33:28]
showing is actually very reasonable.
[2:33:31]
It's even less than that estimate back
[2:33:33]
then. So, I just want, you know,
[2:33:36]
sometimes people say things are too good
[2:33:38]
to to be true. So, I would love for you
[2:33:41]
to just say explain that because some
[2:33:43]
people will just be skeptical because
[2:33:45]
they've been told over.
[2:33:46]
>> I don't I mean I I'm not sure I can
[2:33:48]
answer your questions, but I think a lot
[2:33:49]
of people take a lot of things out of
[2:33:51]
context, right? And so I think the
[2:33:54]
answer to the question is let's do the
[2:33:57]
next stage of planning, spend, you know,
[2:34:00]
it's not a lot of money. Let's do all
[2:34:02]
the layouts and everything that needs to
[2:34:04]
be done to ensure that we meet the goals
[2:34:08]
that you've outlined. Right. Right now
[2:34:10]
it's space. It's blocks of space. It
[2:34:12]
isn't a detailed analysis of equipment
[2:34:15]
requirements and everything else. And
[2:34:16]
that does need to happen.
[2:34:18]
>> But the bids that you you talked about
[2:34:20]
that Ed Dong talked about are are those
[2:34:23]
like bonafideed? Are those I mean you
[2:34:25]
got these bids, what what how how
[2:34:28]
confident are you in those bids? Because
[2:34:30]
we we hear all the time that those these bids are are irrelevant. So well I the only answer I can give you is that
[2:34:38]
I'm confident based on the information
[2:34:40]
that we were given.
[2:34:41]
>> Right. That's
[2:34:42]
>> yeah I just just embellish that the
[2:34:44]
again the two contractors we work with
[2:34:46]
are two of the most renowned uh
[2:34:48]
regionally and you know billion dollar
[2:34:51]
plus plus uh annual volume. Uh you know
[2:34:55]
this is in their sweet spot. Uh, you
[2:34:57]
know, a build group just finished a
[2:34:59]
historic re uh restoration
[2:35:02]
uh was that it Huntington Hotel. I mean,
[2:35:06]
the list goes on. I mean, we did not
[2:35:07]
include for you the resume of all of all
[2:35:10]
the projects, the civic centers that each of these companies have done,
[2:35:15]
but we have great confidence, first of
[2:35:16]
all, in the selection of contractors we
[2:35:18]
talked to and the the drill down that
[2:35:21]
they did in, you know, 24 25 different
[2:35:25]
uh components of construction and the
[2:35:27]
fact that they walked through that
[2:35:28]
building. So, we're we're confident with
[2:35:31]
that conceptual number. Absolutely.
[2:35:34]
>> Thank you.
[2:35:36]
Yeah, Terry, go ahead. Um, so if the
[2:35:41]
town were to choose to vote for an
[2:35:44]
operating fire station, the staffing of
[2:35:47]
it, um, is flooding going to be an
[2:35:50]
issue?
[2:35:51]
>> Is what now?
[2:35:52]
>> Flooding.
[2:35:54]
>> Uh, the answer is potentially.
[2:35:57]
>> Yeah. um because the lower portion of
[2:36:01]
those bays would still be in the flood
[2:36:03]
zone. If we raise the elevation of those
[2:36:07]
pads in the bays by a foot, it helps to
[2:36:09]
some extent, but it needs to go up by
[2:36:11]
about 2 feet. Um so I think in a and I
[2:36:15]
would say certainly in a severe
[2:36:17]
situation, it would make sense to move
[2:36:19]
that equipment, that truck and the EMS
[2:36:22]
vehicle to higher ground. So, but it but
[2:36:25]
with that said, um there are other
[2:36:28]
mitigation that we're looking at, flood
[2:36:31]
mitigation techniques that would get us
[2:36:34]
that extra foot, but I'm I'm there's no
[2:36:36]
guarantees.
[2:36:37]
>> Yeah,
[2:36:37]
>> there's no guarantees. And I I think
[2:36:39]
that I mean, look at that's part of the
[2:36:41]
compromise that we're talking about here
[2:36:43]
is that are we willing to compromise
[2:36:45]
that or not? Are we willing to
[2:36:48]
compromise the fact that one of the
[2:36:49]
driveways doesn't, you know, hit Laurel
[2:36:52]
Grove head on or not? Right. I do think
[2:36:55]
there are risk mitigation efforts that
[2:36:58]
we can undertake to solve those
[2:37:00]
situations, but it isn't perfect.
[2:37:03]
>> Okay.
[2:37:03]
>> It isn't perfect. Right.
[2:37:04]
>> I notice that uh Chief Mahoney is here.
[2:37:07]
Chief, would
[2:37:11]
to be part of the Ross Valley Fire
[2:37:13]
District and we're talking about flood
[2:37:17]
control. How important is that for a
[2:37:19]
fire station, especially one that is
[2:37:23]
going to go through a renovation?
[2:37:30]
Yeah, I think um if you looked at the
[2:37:33]
addendum that u Manager Johnson sent out
[2:37:36]
earlier or uh this afternoon, um all of
[2:37:39]
our fire station um engine rooms are are
[2:37:43]
in the flood zone. Um yes, we do have a
[2:37:47]
plan to move the the fire engines and we
[2:37:49]
have specific areas to move them. Um
[2:37:52]
however, you know, it it is less than
[2:37:55]
ideal. you know, we deal with it because
[2:37:57]
that's that's what we were kind of given
[2:37:59]
through through the many many years. Uh
[2:38:02]
I think it's also important to recognize
[2:38:04]
that we've probably uh moved equipment
[2:38:07]
and uh personal vehicles I would say
[2:38:11]
maybe three to four times over the last
[2:38:14]
five years because we we move them also
[2:38:17]
when it when there's um anticipated
[2:38:20]
flooding, not just uh we take a
[2:38:22]
proactive approach to it and we don't
[2:38:24]
move them obviously when the when the
[2:38:26]
water's coming up to the to the engine
[2:38:28]
room doors, but um we have, you know,
[2:38:32]
there is a significant amount like the
[2:38:34]
uh gentleman spoke here, there is a
[2:38:36]
significant amount of um rehab that
[2:38:39]
needs to be done even even when an
[2:38:41]
engine room is flooded. But it's so it's something that's going to need to
[2:38:45]
kind of you know be at the hands of the
[2:38:47]
council to decide is is that what you
[2:38:49]
know is that what you're willing to
[2:38:50]
compromise with.
[2:38:52]
>> So sorry just because you're up there um
[2:38:55]
Sleepy Hollow is just completing its uh
[2:38:58]
re redo, right? The remodel.
[2:39:00]
>> Yes. And those bays were not raised.
[2:39:02]
>> No.
[2:39:03]
>> Why? Why not?
[2:39:05]
>> Um they weren't raised. I don't I think
[2:39:06]
because it functionally wasn't possible.
[2:39:08]
The the fire stations built over the
[2:39:10]
creek. So um there was a decision made
[2:39:13]
by the town that um those engine bays
[2:39:16]
would stay um in the flood zone and that
[2:39:19]
the remainder of the the building would be raised. And so, hey, so none of
[2:39:23]
the other uh our sister stations during
[2:39:27]
their I know Fairfax is doing a small
[2:39:29]
remodel of their housing essentially
[2:39:31]
part and the headquarters in Sano, all of them, their bays are within the
[2:39:36]
flood zone.
[2:39:37]
>> All of them are within the flood zone.
[2:39:38]
The the Fairfax remodel isn't really
[2:39:41]
comparable to be honest with you. It's
[2:39:42]
an it's an upstairs remodel of of the
[2:39:45]
second floor, so it's in an an existing
[2:39:48]
footprint. um there's no work being done
[2:39:50]
downstairs or in the engine room. And
[2:39:52]
then for the fire station and fire
[2:39:54]
station 19, which is the one in San
[2:39:56]
Ando, that one was a remodel and that
[2:39:58]
was was mainly funded through FEMA to um
[2:40:01]
to recuperate from the flooding that station actually incurred. So um
[2:40:07]
you know, unless we had other funds, we
[2:40:09]
weren't going to be able to to to raise
[2:40:11]
the entire fire station. So while not
[2:40:13]
ideal, basically we're similar to all
[2:40:16]
the other stations that would be in the
[2:40:18]
flood zone.
[2:40:19]
>> Yes. Yeah, you're correct. It it is
[2:40:21]
definitely not ideal, but all of the
[2:40:23]
other fire stations are within the flood
[2:40:25]
zone.
[2:40:25]
>> Thank you,
[2:40:30]
» Rich. Do you want to elaborate on the
[2:40:31]
flood issue?
[2:40:45]
Yes, Mayor and Council Rich Simmonage,
[2:40:47]
public works director.
[2:40:49]
Um, elaborate on the flood issue. Uh,
[2:40:53]
so just to correct uh Dan's last
[2:40:57]
statement that or that they're all the
[2:40:59]
same, all four stations are the the same
[2:41:02]
with regards to a flood zone. That's not
[2:41:04]
entirely correct. Um,
[2:41:08]
Sleepy Hollow, uh, Butterfield Road in
[2:41:11]
front of Sleepy Hollow is in a 100-year
[2:41:14]
flood plane. Um, Sanelmo Avenue in front
[2:41:17]
of the S downtown Sanelmo, it's a
[2:41:20]
actually in the regulatory floodway.
[2:41:22]
It's actually a high velocity river
[2:41:24]
during a flood.
[2:41:26]
And the fire station in Fairfax,
[2:41:30]
I think it's Park Road, is also a
[2:41:33]
100red-year flood plane. The difference
[2:41:36]
with Ross is Sir Francis Drake Boulevard
[2:41:40]
is out of the flood plane.
[2:41:42]
So,
[2:41:46]
you would
[2:41:48]
be compelled to
[2:41:51]
uh design your if you're going to be
[2:41:54]
designing a fire station in this site,
[2:41:58]
why wouldn't you have your flood your uh
[2:42:03]
equipment bays raised out of the flood
[2:42:06]
plane to access a roadway that's out of
[2:42:09]
the flood plane. That's the major
[2:42:11]
difference between Ross
[2:42:14]
and the other Ross Valley fire stations.
[2:42:20]
Um to evaluate the flood situation here
[2:42:25]
in Ross with our equipment base,
[2:42:28]
there's uh three things, three entities
[2:42:31]
you need to consider. There's FEMA,
[2:42:34]
there's our own building code and flood
[2:42:37]
plane ordinance,
[2:42:39]
and then there's the essential services
[2:42:41]
requirements for building a a fire
[2:42:45]
station. Uh FEMA
[2:42:48]
is more concerned with with public
[2:42:50]
safety and building integrity during a
[2:42:53]
flood. They don't want they don't want
[2:42:54]
damaged structures, whether it's a
[2:42:58]
equipment bay or a residence or a
[2:43:01]
garage.
[2:43:02]
Uh they want living spaces built out of
[2:43:05]
the one foot above the flood plane uh to
[2:43:09]
minimize insurance claims. That's the
[2:43:12]
NFIP is all about insurance claims.
[2:43:16]
the building code and the flood plane
[2:43:19]
ordinance,
[2:43:23]
they require that the they would require
[2:43:26]
that the flood that the equipment bays
[2:43:29]
be raised out of the flood plane the the
[2:43:32]
2T above the 100year or at the 500year
[2:43:35]
if there's no other alternative
[2:43:37]
available. That's that's the
[2:43:40]
consideration. uh Sleepy Hollow, they
[2:43:45]
didn't have to raise the base because
[2:43:47]
there's no other option. You can raise
[2:43:48]
them out of the flood plane mode.
[2:43:49]
Butterfield Road is in a 100red-year
[2:43:51]
flood plane. What's the point? Here in
[2:43:54]
Ross, that's what staff will be looking
[2:43:58]
at during the permit process.
[2:44:00]
We'll be looking for findings as to why
[2:44:03]
it's not feasible
[2:44:06]
to
[2:44:08]
build a new fire station or renovated
[2:44:12]
fire station where you have the
[2:44:14]
equipment bays uh out of the flood plane
[2:44:18]
accessing a major roadway that's also
[2:44:20]
out of the flood plane. So we want to
[2:44:24]
staff would want to see reasons why
[2:44:27]
it's not that's not feasible and we want
[2:44:29]
to leave the equipment bays where we
[2:44:32]
where they are. So that's that's kind of
[2:44:35]
the considerations.
[2:44:38]
» Thank you.
[2:44:39]
>> I have a question for Rich just while
[2:44:40]
he's up there.
[2:44:41]
>> So when these bays were built in 1995
[2:44:45]
>> and they were I think three and a half
[2:44:46]
million. Why was this not uh done back
[2:44:50]
then? Because we we obviously knew that
[2:44:53]
they were in the flood plane.
[2:44:54]
>> Yeah, that's a great question. Uh 1995
[2:44:57]
is what 13 years after the New Year's
[2:45:00]
Eve flood. Um
[2:45:04]
why we did that, I don't know. I I I've
[2:45:06]
asked myself several times. We had an
[2:45:09]
opportunity back then to do it right. We
[2:45:12]
didn't. We have an opportunity now to do
[2:45:14]
it right. What are we going to do?
[2:45:18]
And I have a question about when that
[2:45:20]
decision gets made when when the staff
[2:45:23]
would make the decision about whether we
[2:45:25]
would have to raise it two feet or not.
[2:45:28]
>> So again, it comes back to evaluating
[2:45:31]
the findings from the flood plane
[2:45:33]
administrator
[2:45:35]
uh the building official and it's it it
[2:45:38]
remains to some point a ministerial
[2:45:40]
decision. Um,
[2:45:43]
I think it would need to be and I'm not
[2:45:45]
fully familiar with a design review
[2:45:47]
process, ADR and all of that, but I
[2:45:50]
think the the findings need to be
[2:45:53]
evaluated at some point like during the
[2:45:56]
planning process. So, that's where
[2:46:00]
council would hear, well, we can't do it
[2:46:04]
because
[2:46:05]
XYZ.
[2:46:07]
um yeah, we could do this, but it
[2:46:09]
doesn't make sense or it's too expensive
[2:46:11]
because of ABC.
[2:46:14]
Then you evaluate that for the for the
[2:46:18]
planning permit, which comes before the
[2:46:19]
building permit process. I think that's
[2:46:22]
the process we would uh we would go
[2:46:24]
through.
[2:46:28]
I I have one more followup and I think
[2:46:31]
Dan I it sounded like you said that the
[2:46:35]
if there were to be fire services down
[2:46:37]
the road it wouldn't be a full
[2:46:41]
fire like the other three stations and
[2:46:44]
maybe I may have misheard you. You were
[2:46:46]
referring to Bob.
[2:46:50]
I'm not sure exactly what the question
[2:46:52]
is, but I
[2:46:53]
>> Well, I'm wondering if it's if it's
[2:46:55]
three people to an engine that's what's
[2:46:58]
being contemplated,
[2:46:59]
>> right? Yes, that's it.
[2:47:01]
>> Great.
[2:47:01]
>> Right. And I think what we had before
[2:47:03]
was something much more substantial than
[2:47:05]
that. I think I don't know.
[2:47:07]
>> Meaning planned before then or no?
[2:47:10]
>> I don't think so.
[2:47:11]
>> Okay. Thank you.
[2:47:12]
>> I mean, it's possible. I mean, I you
[2:47:15]
know, it would be a cost issue. I still
[2:47:17]
think no matter what we do that is
[2:47:19]
single building makes the most sense
[2:47:21]
over the long run. Um
[2:47:24]
we could build it back end. We could
[2:47:26]
raise that roof. We could raise the
[2:47:28]
whole structure up if we have to. Those
[2:47:30]
things are feasible. It's not you know
[2:47:32]
it's it's a light frame construction.
[2:47:34]
It's not heavy, not steel, not I don't
[2:47:38]
think it's concrete. Is it Ed? Is I
[2:47:40]
think it's all light. It's all light
[2:47:41]
frame. So it's all light frame. So
[2:47:43]
there's you know it would be a cost
[2:47:45]
consideration. But if we all said we
[2:47:46]
want to be out of the flood plane, we
[2:47:48]
got to raise that elevation by 2 feet.
[2:47:51]
I think the biggest question would be
[2:47:52]
more on the environmental side of the
[2:47:54]
equation and bringing the fill in and
[2:47:57]
then how do we handle landscaping and
[2:48:00]
some of the other hardcape and that kind
[2:48:02]
of thing because it would create
[2:48:04]
potentially a situation where you got to
[2:48:06]
get the trucks out and they got to be at
[2:48:09]
elevation coming out of the drives, but
[2:48:11]
then you really have to raise the whole
[2:48:13]
parking lot potentially. I think you
[2:48:15]
really got to play with it and try to
[2:48:16]
figure out maybe there's ways to even
[2:48:19]
ramp the site so that parking areas
[2:48:21]
might be lower than some of the ramping
[2:48:24]
meaning just simply sloping the
[2:48:26]
driveways and such that you but you
[2:48:28]
could you could do it. We could build it
[2:48:30]
out of the flood plane. It's a I think
[2:48:32]
it essentially a cost issue more than
[2:48:34]
anything else.
[2:48:37]
Just one one more question on that that
[2:48:39]
as lead agency don't we um have the
[2:48:41]
ultimate decision authority on these
[2:48:44]
matters
[2:48:47]
and maybe it's for Roberta but I I mean
[2:48:49]
we're the lead agency of this project
[2:48:51]
and we grant variances all the time so
[2:48:54]
that's
[2:48:55]
>> right but you again it comes to back to
[2:48:58]
feasibility if it's if it's in
[2:49:01]
determined to be not feasible then
[2:49:04]
there's there's not so much of an issue
[2:49:07]
um as far as uh needing to raise it out
[2:49:10]
of the flood plane or do the the wet
[2:49:12]
flood proofing and that sort of thing.
[2:49:14]
So um and again that's that is going to
[2:49:17]
come I see that as being part of the
[2:49:20]
planning process the uh the planning
[2:49:23]
permitting
[2:49:25]
um
[2:49:26]
so yeah maybe it is the question for
[2:49:30]
planning but um it's really kind of
[2:49:33]
unknown I think at at this point I it it
[2:49:37]
depends on what
[2:49:39]
well I mean it's a town project so we
[2:49:41]
would have to come up with the findings
[2:49:43]
ourselves elves
[2:49:45]
to convince the council that this is
[2:49:47]
something we want to do. It's at at some
[2:49:51]
point the project gets handed over to
[2:49:53]
the town. It's a town project. It's a
[2:49:54]
town-owned
[2:49:56]
um building. Town's also lead agency in the SE SQA process.
[2:50:03]
How much do we want to be exposed during
[2:50:06]
the SUKA process? Do we want it really
[2:50:07]
tight? Do we want a EIR? Do we need an
[2:50:09]
EIR? I think we would at least need a
[2:50:13]
mitigated negative deck because you have
[2:50:16]
cultural resources. You have I mean look
[2:50:19]
what happened with the spotted alice
[2:50:20]
just to get our bridges done. That
[2:50:22]
delayed the project six months. Winship
[2:50:24]
bridge cultural resources three years.
[2:50:28]
Those things need to be all addressed by
[2:50:33]
the town. We're lead agency and it's our
[2:50:35]
project.
[2:50:39]
You know, when you mentioned town, I
[2:50:41]
mean, it's the council's I mean, we are
[2:50:43]
the town, the council, right? I mean, so
[2:50:45]
we delegate those decisions, but it's
[2:50:48]
the council ultimately that makes the
[2:50:50]
decisions.
[2:50:51]
>> That's correct.
[2:50:55]
» Bill, did you have something?
[2:51:03]
» I do. Let's see if I can figure out a
[2:51:05]
way to say this. Um, so I think
[2:51:08]
education for the bond measure is
[2:51:09]
important.
[2:51:11]
Education of the community
[2:51:14]
for the bond measure is important. And
[2:51:16]
one of the issues is that there's going
[2:51:20]
we're going to keep the bays in the back
[2:51:24]
for potentially a fire station.
[2:51:28]
Okay. So
[2:51:33]
there may or may not be a fire station,
[2:51:36]
right? Um and how do we make sure that
[2:51:40]
people understand that when they are
[2:51:43]
voting on this bond measure, it's for
[2:51:45]
the building, not the staffing. It's
[2:51:49]
just the building. And that space could
[2:51:53]
be used for many things.
[2:51:55]
How do we do that? How do we make sure
[2:51:57]
that we're transparent about that and
[2:52:00]
that there's no sort of miscommunication
[2:52:03]
that you built, you know, I I So anyway,
[2:52:06]
that's my question.
[2:52:10]
» You know, I find just telling the truth
[2:52:11]
usually works.
[2:52:14]
>> It does. So, you you bet there's going
[2:52:18]
to have to be an aggressive, persuasive,
[2:52:21]
>> serious education
[2:52:23]
um strategy
[2:52:25]
for the town. And we're going to have to
[2:52:27]
do it multiple times in multiple places.
[2:52:32]
» There's no elegant answer to that. It's
[2:52:34]
just hard work. You got to do it.
[2:52:39]
» Yes. But I'm saying we have to be honest
[2:52:41]
that if you build this facility, which
[2:52:44]
is going to be beautiful, there is room
[2:52:47]
for
[2:52:48]
staff and trucks, but that's a
[2:52:51]
completely separate financial issue.
[2:52:54]
>> You bet it is.
[2:52:55]
>> Okay. And I I would want to make sure
[2:52:57]
that when people vote on the geo bond
[2:52:59]
that they're voting on the building and
[2:53:02]
not they don't think that they're going
[2:53:03]
to be getting an a working fire station
[2:53:06]
because that's a whole separate issue.
[2:53:08]
in all kinds of ways, not
[2:53:10]
the least of which is financial,
[2:53:12]
>> right? And can we say to people at the
[2:53:14]
time if they say, "Oh, a fire station,
[2:53:15]
this is great." Um, what's it going to
[2:53:18]
cost us to staff it? Do we have that
[2:53:20]
information?
[2:53:21]
>> Sure.
[2:53:21]
>> And can we give that to people?
[2:53:23]
>> I'm sorry.
[2:53:24]
>> And can we give that to people when they
[2:53:25]
ask, they say, "What's it going to cost
[2:53:27]
me to have the staff?"
[2:53:30]
I think it would be important for people
[2:53:31]
to know the January council meeting,
[2:53:36]
the fire consultants for both sides came
[2:53:39]
up with almost identical numbers.
[2:53:42]
>> It was, you know, a million and a half
[2:53:45]
bucks for a used truck
[2:53:49]
plus equipment.
[2:53:50]
>> Mhm.
[2:53:51]
>> And then there were going to be three
[2:53:53]
guys per shift. So that's nine plus a
[2:53:57]
chief plus part-time
[2:54:00]
um clerical if I remember that correctly
[2:54:05]
and that would start at around three and
[2:54:07]
a half million a year.
[2:54:08]
>> Mhm.
[2:54:10]
>> And it would and I specifically remember
[2:54:13]
um somebody in fact I think both of them
[2:54:16]
saying that the cost of living increase
[2:54:19]
on that particular segment is twice what
[2:54:22]
it is for consumer products.
[2:54:25]
So it's going to be an expensive
[2:54:27]
process. On year one,
[2:54:30]
it would be five plus million
[2:54:34]
and then three and a half million from
[2:54:36]
that point going forward.
[2:54:40]
Right? So it's not trivial and there's
[2:54:42]
this is not like a building. This goes
[2:54:44]
on for what a decade, two decades, I
[2:54:47]
don't know how many. Right? So it's a
[2:54:50]
ton of money.
[2:54:51]
>> It is a ton of money. And I think people
[2:54:53]
will want to know how does it affect
[2:54:55]
them personally? Like what is it going
[2:54:57]
to cost me?
[2:54:58]
>> Well, it depends on it depends on how we
[2:55:01]
raise the money to do that. If there's a
[2:55:03]
giant sugar daddy that comes in and
[2:55:05]
writes a huge check, no problem.
[2:55:07]
>> Perfect.
[2:55:08]
>> Right. There's a different kind of bond
[2:55:11]
issue called a melo bond which can be
[2:55:14]
used for services namely salaries and
[2:55:18]
the truck, right? But there's no end in
[2:55:21]
sight to that.
[2:55:22]
And it's expensive.
[2:55:25]
>> Yes.
[2:55:26]
>> And of course, we could always raise the
[2:55:27]
public safety parcel tax. We would have
[2:55:30]
to raise it. We'd have to quintuple
[2:55:33]
that.
[2:55:35]
And so now you're telling people, by the
[2:55:36]
way, your parcel tax for the public
[2:55:38]
safety is now going to be approaching
[2:55:40]
$6,000 a year.
[2:55:42]
>> You think they're going to like that?
[2:55:43]
No. So it is a real puzzle about how to
[2:55:47]
finance this thing. I've thought about
[2:55:49]
it a lot.
[2:55:51]
There's no easy way.
[2:55:53]
>> Thank you.
[2:55:54]
>> So, I have one one more question. Um I
[2:55:58]
it sounds like we need to hire bond
[2:56:00]
council too to help us draft the legal
[2:56:02]
documents and the description and and
[2:56:05]
where would that be on the timeline? Uh
[2:56:10]
well, at some point before the the bond vote or maybe even slightly
[2:56:16]
after the actual timing um that I got
[2:56:20]
from Freriedman was once the um once the
[2:56:26]
vote has been taken and the twothirds
[2:56:29]
um threshold has been achieved, it's
[2:56:33]
going to take three months before the
[2:56:34]
bonds get issued. Right? There has to be
[2:56:39]
bond counsel. There has to be an
[2:56:40]
underwriter. There has to, you know, in
[2:56:43]
my term, an investment bank to do it. It
[2:56:46]
has to be rated by S&P standard and
[2:56:49]
force. And by the way, Freriedman thinks
[2:56:52]
that the town of Ross
[2:56:54]
um would get to double A plus possibly a
[2:56:57]
AAA rating.
[2:57:00]
And I also asked, by the way, uh this
[2:57:03]
was um to one of the Freriedman people.
[2:57:06]
I said, "How often is it that uh the a
[2:57:10]
wealthy town, so Ross, Piedmont, uh
[2:57:15]
Athetherton, etc., how often is it that
[2:57:17]
the wealthy members of the town gobble
[2:57:20]
up the the bond offering frequently is
[2:57:24]
the answer."
[2:57:26]
So,
[2:57:28]
>> I was actually thinking who's going to
[2:57:30]
draft all this language that we have to
[2:57:32]
submit to the register of voters to get
[2:57:35]
this on the ballot.
[2:57:36]
>> That's what that's what is all about.
[2:57:38]
>> Ben's office would do.
[2:57:40]
>> Okay, Ben. Good. Well, we already have
[2:57:42]
you.
[2:57:43]
>> Well, it isn't going to be us.
[2:57:45]
>> No, I know. I just wondered if we needed
[2:57:47]
separate bond counsel. So, that's that's
[2:57:49]
good news. Elizabeth, did you want to
[2:57:50]
say something?
[2:57:51]
>> Just one thing. How quickly, if the if
[2:57:53]
the council approves this plan, how
[2:57:56]
quickly can we hire an architect? I know
[2:57:58]
Christa set things in motion already
[2:58:00]
with the RF cues.
[2:58:05]
>> Um, anyway, how quickly do you think we
[2:58:08]
can get an architect hired?
[2:58:15]
» I I have many things to say and when appropriate and I'd be happy to
[2:58:19]
respond to that and some other things.
[2:58:21]
Yeah, I think we should um maybe
[2:58:25]
wrap the questions up for this esteemed
[2:58:29]
committee and maybe take a five minute
[2:58:31]
break and then come back and staff can
[2:58:35]
be asked questions or you know make
[2:58:37]
statements whatever and we can have
[2:58:40]
public comment and then we'll bring it
[2:58:42]
back for discussion and future actions.
[2:58:45]
>> Um mayor, may I just ask a quick
[2:58:47]
question clarifying question of the
[2:58:48]
team? Um
[2:58:51]
when in your cost estimates,
[2:58:54]
this is about the fire station. So I
[2:58:56]
understand that the cost estimates
[2:58:59]
include in this very conceptual design
[2:59:02]
include space for a fire station
[2:59:07]
and building. Is it correct to say it
[2:59:10]
includes costs related to the you know
[2:59:13]
the building out of the shell? Does it
[2:59:16]
include all the tenant requirements
[2:59:19]
that fire stations need such as you know
[2:59:23]
diesel exhaust systems etc etc. Is that
[2:59:27]
included in the cost estimate?
[2:59:29]
>> Yeah.
[2:59:32]
» Yes it is. Exhaust system ffony all it
[2:59:37]
uh communications. So yes it you
[2:59:39]
included the whole appliances the whole
[2:59:41]
fit out.
[2:59:43]
>> Thank you.
[2:59:46]
Okay. So, let's take a five minute break
[2:59:48]
and resume at 9:08.
[2:59:51]
Thank you.
[3:08:44]
I think we got out of
[3:08:46]
>> Let's get started.
[3:08:53]
Um, okay. We're gonna we're going to
[3:08:56]
start with um questions andor comments
[3:09:00]
that um staff has. Do people have
[3:09:02]
questions for staff?
[3:09:07]
» Yeah. Uh you know, I just want to make a
[3:09:11]
comment. We um obviously Christa, we saw
[3:09:14]
you sent an email at four four o'clock
[3:09:17]
with a lot of a lot of meaty staff
[3:09:20]
report and unfortunately it's just it's
[3:09:23]
not enough time I think for for me at
[3:09:26]
least to digest so much of um
[3:09:28]
information and I appreciate very much
[3:09:31]
that you were trying to get to us some
[3:09:34]
of your thoughts.
[3:09:36]
I I I don't know how you guys feel, but
[3:09:38]
I almost feel like this we all know this is a concept and there's a lot of
[3:09:43]
details to be worked out still and it
[3:09:45]
might be helpful to sort of get to that
[3:09:49]
next stage where they're working with
[3:09:50]
staff and then come back to us when
[3:09:53]
because there's so many things that
[3:09:55]
you've pointed out in your your your
[3:09:56]
assessment that are just un unanswered
[3:09:59]
yet because it sounds like staff and the committee haven't really worked
[3:10:02]
together yet. So, I don't know how
[3:10:04]
helpful it is really to go through all
[3:10:06]
the this I mean, welcome to hear it. I'm
[3:10:09]
just saying it it seems so premature
[3:10:11]
right now that I I would prefer that we
[3:10:14]
sort of move forward and see if we all
[3:10:16]
want this and then let you guys work it
[3:10:18]
out and then come back to us with
[3:10:20]
staff's comments because there's just so
[3:10:22]
much unknown right now and none of us
[3:10:24]
have really had a chance to go through
[3:10:26]
your your detailed staff report.
[3:10:34]
Maybe you could hit the the high the
[3:10:36]
high notes of what you sent us. And um
[3:10:41]
you know, my main question is what what
[3:10:44]
would be your recommended next steps
[3:10:46]
>> going forward to try to continue to
[3:10:49]
advance the ball, maybe try to appease
[3:10:53]
the fourth people with dropping the
[3:10:55]
initiative. I don't know if that's
[3:10:56]
possible given when we're going to get
[3:10:59]
actual cost information, which seems
[3:11:02]
like after the deadline for filing a
[3:11:04]
general obligation bond for a November
[3:11:06]
election. Um, but maybe Christa, you
[3:11:09]
know, you can give us some concrete
[3:11:12]
steps that we can take.
[3:11:14]
>> Sure. Um, thank you, Mayor and Council,
[3:11:16]
and and thank you to the um the
[3:11:18]
committee for all the substantial amount
[3:11:20]
of work that you've done. And I'm super
[3:11:22]
excited about what I saw tonight. And
[3:11:25]
you know, the idea of of of as Miss
[3:11:27]
Buckingham had described to me last week
[3:11:30]
of tightening up the site and and
[3:11:33]
building up and I just want to uh bring
[3:11:36]
it to the council's attention that, you
[3:11:38]
know, 3 to four years ago when the
[3:11:39]
council was working on this uh
[3:11:41]
facilities master plan, that was
[3:11:42]
actually one of the options that the
[3:11:45]
architectural firm KPA that was working
[3:11:47]
on this brought to the council along
[3:11:49]
with a cost estimate and the council's
[3:11:51]
feedback and the community feedback at
[3:11:53]
the time was that it was it was too
[3:11:55]
expensive. So, I just wanted to remind
[3:11:58]
you and a couple of you were not on the
[3:11:59]
council then that this idea was was
[3:12:02]
brought forward and absolutely let's evaluate it again if that's what
[3:12:06]
the council wants to do. Um,
[3:12:10]
and I'm, you know, I'm overjoyed at the
[3:12:14]
uh at the the interest and the passion
[3:12:17]
the committee has on being able to help
[3:12:20]
um to to be a to advocate for any
[3:12:23]
measure that goes to the community
[3:12:26]
because it I know Ben's going to like it
[3:12:28]
when I say this is that, you know, we
[3:12:30]
cannot we cannot advocate once this goes
[3:12:33]
on a ballot. This the town cannot
[3:12:36]
advocate for this. We can educate but we
[3:12:38]
cannot advocate. So the importance of
[3:12:40]
having a community group that has
[3:12:43]
already proven how skilled they are at
[3:12:46]
engaging the community and um it to be
[3:12:51]
behind this is just you know I'm super excited about that. Um I wanted
[3:12:57]
just to make a couple of um uh
[3:13:00]
clarifications for the council. Um, this
[3:13:03]
is just a little thing, but as you're
[3:13:04]
looking at timelines, the date by which
[3:13:08]
we have to have the council would have
[3:13:10]
to um take action on ballot measures for
[3:13:13]
November, and that's going to include
[3:13:15]
the RVPA ballot measure that'll be
[3:13:17]
coming forward to for you to discuss in
[3:13:20]
June. The date deadline is actually
[3:13:21]
August 7th, not August 8th. So, just
[3:13:24]
want to make sure you aware of that. And
[3:13:26]
I was wanted to also clarify and remind
[3:13:28]
the council when um when Jeff was um was
[3:13:33]
stating about answering council member
[3:13:35]
Dowling's questions about the costs of
[3:13:37]
staffing. This information was provided
[3:13:40]
to the council last January as part of
[3:13:42]
the election code report and that three
[3:13:45]
and a half figure million figure that
[3:13:48]
Jeff commented on that is in addition to
[3:13:51]
what we already pay. So on an ongoing
[3:13:54]
basis, we would have to pay that plus
[3:13:57]
what we have we've already committed to
[3:13:59]
pay to Ross Valley Fire Department. Now
[3:14:02]
I understand certain people believe that
[3:14:05]
we could perhaps negotiate that down,
[3:14:07]
but it's still in addition to what we
[3:14:10]
already pay to have fire service
[3:14:13]
provided to our community. Um so we you
[3:14:17]
know we didn't we as staff did not we
[3:14:20]
didn't have much time to um provide our
[3:14:24]
um just initial evaluations and kind of
[3:14:27]
similar to what happened last year when
[3:14:30]
um the fourth group provided us with
[3:14:33]
information to put into the agenda
[3:14:35]
packet. They provided it at 400 p.m. on
[3:14:38]
New Year's Eve and we had to get out the
[3:14:40]
agenda packet on January 2nd. this was
[3:14:44]
for your January 8th meeting. So,
[3:14:46]
especially over the holidays and because
[3:14:48]
we're we don't have many staff, we have
[3:14:50]
we really depend on the consultants that
[3:14:52]
we had hired to do that report. We
[3:14:55]
didn't have much time to put together
[3:14:57]
information for the council in advance.
[3:15:00]
We did put together information to
[3:15:03]
provide at the council meeting in a
[3:15:05]
PowerPoint, but we were um the council
[3:15:08]
and our town attorney did not allow me
[3:15:10]
to provide that information. So I
[3:15:12]
provided that information after the
[3:15:15]
meeting, a couple weeks after the
[3:15:17]
meeting if you recall and that
[3:15:18]
information is available on the website.
[3:15:20]
So this time I thought let's even though
[3:15:24]
we just got the information um last week
[3:15:27]
and it was it you know there were
[3:15:29]
differences between what's in the
[3:15:31]
packet, what went into your agenda
[3:15:33]
packet that you received on Friday and
[3:15:35]
what was shown today.
[3:15:37]
I did the best I can to just try to get
[3:15:39]
some information to the council, some
[3:15:41]
initial observations. And so I um sent
[3:15:46]
it to you, as council member Salter um
[3:15:49]
stated, it was sent very late this
[3:15:51]
afternoon. Did the best I can to get it
[3:15:53]
out. It's available on the website. And
[3:15:55]
what I did was just identify a series of
[3:15:59]
issues or concerns that the council
[3:16:04]
needs to take a look at before you
[3:16:08]
consider amending your facil's master
[3:16:11]
plan. And so, um, you know, this item is
[3:16:14]
not before you as an action item
[3:16:15]
tonight. So, absolutely take a look at
[3:16:18]
that. I'm you feel free to call me with
[3:16:20]
any questions you have. Um,
[3:16:24]
the other clarification I wanted to say,
[3:16:27]
so I'm again super excited about what
[3:16:30]
what's been put together, super excited
[3:16:32]
about the the passion of this group and
[3:16:35]
very willing as we go through this
[3:16:39]
design process to work with this
[3:16:42]
committee or um, and I've been speaking
[3:16:45]
with my colleagues around the state who
[3:16:47]
have gone through these processes for
[3:16:48]
major civic public buildings.
[3:16:52]
is um sometimes uh uh councils set up a
[3:16:56]
subcommittee of them of their own of
[3:16:59]
their own members um to help work on uh
[3:17:03]
you know the selection of an architect
[3:17:05]
and and working on a design and and
[3:17:08]
working on um you know during the
[3:17:10]
construction process because there's
[3:17:12]
always going to be changes made all that
[3:17:14]
kind of stuff. So sometimes councils
[3:17:16]
choose to do that. Sometimes councils
[3:17:18]
choose to um establish um committee um
[3:17:23]
committee groups such as the one that um
[3:17:25]
you know they established themselves.
[3:17:27]
This was not put together by the
[3:17:28]
council. Sometimes that community group
[3:17:31]
would be established for a specific
[3:17:33]
purpose. I was speaking with somebody
[3:17:35]
today where a city in Southern
[3:17:37]
California used a community group to
[3:17:39]
help them choose an architect. And then
[3:17:42]
that community group once that architect
[3:17:44]
was was chosen and a contract was put
[3:17:47]
into place then that community group
[3:17:49]
ended and it went back to a staff
[3:17:52]
working with those consultants and and
[3:17:54]
the council. Um and then of course the architectural firms usually have
[3:17:58]
extensive public out outreach components
[3:18:01]
of their contracts. So, um,
[3:18:06]
the other clarification,
[3:18:08]
so, so there are those different kinds
[3:18:10]
of options that that council could use
[3:18:12]
to still draw on the expertise of the citizens committee and expertise of other people in the community that
[3:18:21]
you you might wish to be uh involved in
[3:18:25]
this process as we go forward. But
[3:18:27]
another one of the clarifications I
[3:18:29]
wanted to make is um that Mayor Prom
[3:18:32]
Robbins asked of the committee members
[3:18:36]
is she asked earlier in the meeting
[3:18:38]
tonight why why would this need to go to
[3:18:42]
staff? Why, you know, the committee's
[3:18:43]
doing a great job. Why wouldn't they
[3:18:45]
just go forward? And um there there are quite a few reasons why. and
[3:18:52]
you operate under as 95% of the cities
[3:18:56]
in the in this nation operate under a
[3:18:58]
council town manager form of government
[3:19:02]
that is explicitly stated in your
[3:19:04]
municipal code and your council adopted
[3:19:06]
guidelines. So you cannot hand this off
[3:19:11]
to a community group to do and have them
[3:19:14]
just and have me and my team, right?
[3:19:18]
Town staff report to me, consultants
[3:19:21]
report to me and just have us serve as
[3:19:24]
resources. That's that's not allowed
[3:19:27]
under your council manager form of
[3:19:30]
government.
[3:19:31]
certain aspects of this are that also is
[3:19:35]
not allowed under state law. It's we
[3:19:39]
have there are procurement processes
[3:19:42]
especially when it comes to major public
[3:19:45]
works projects such as this that um our
[3:19:49]
town attorney and our public works
[3:19:50]
director would be more articulate to
[3:19:52]
describe if the council needs that. So,
[3:19:55]
and then in addition, I want to remind
[3:19:58]
you, you also have an I have an
[3:20:00]
employment agreement with the town. You
[3:20:03]
set policy. You I have to bring forward
[3:20:07]
I implement policy. I bring forward
[3:20:10]
contracts. I bring forward contracts and
[3:20:13]
I that are reviewed and oftentimes um uh
[3:20:16]
written by the town attorney. But that
[3:20:19]
that's how this works. And so I don't
[3:20:21]
want you to be under
[3:20:24]
I want you to understand and remind you
[3:20:27]
that absolutely this group welcome their expertise
[3:20:33]
in any way that the council wants that
[3:20:36]
to happen. But this is a town project
[3:20:39]
that would be run by staff. And we have
[3:20:44]
to go to the council in many ways. any
[3:20:47]
contract over $50,000 has to go to the
[3:20:49]
town council. Um,
[3:20:52]
so to answer your question, mayor, about
[3:20:56]
what I see the next steps being,
[3:21:00]
this is how so we re we um the council
[3:21:04]
approved our request for qualifications
[3:21:07]
for architectural and engineering firms
[3:21:09]
and an affordable housing partner to
[3:21:13]
work with. Those submitts were due on
[3:21:16]
April 3rd. We received 10 for the
[3:21:20]
architectural engineering and we
[3:21:22]
received two for the affordable housing
[3:21:25]
partners and I sent the names uh to the
[3:21:27]
council a few a few weeks ago. Um
[3:21:31]
we um
[3:21:34]
staff has been evaluating them as best
[3:21:37]
we can keeping in mind that we had your
[3:21:40]
annual budget meeting last week. We had
[3:21:42]
to put together this meeting in two
[3:21:45]
weeks before we originally thought this
[3:21:47]
meeting was going to be. And um so um
[3:21:52]
what I have done I am um so we received
[3:21:55]
the 10 submitts to the request for
[3:21:57]
qualifications. We've begun our
[3:21:58]
evaluation. Um I'm in the process of
[3:22:01]
hiring a firm that will serve as um an
[3:22:05]
owner's representative for this project.
[3:22:08]
This is something that just about every
[3:22:11]
city, large or small, ends up doing
[3:22:14]
because we don't have the staff that is
[3:22:17]
that um we don't have the staff
[3:22:21]
expertise to do uh what is needed to be
[3:22:24]
done. So, I'm going to start off because
[3:22:27]
remember I I have to take we do have a
[3:22:29]
budget in the current fiscal year to do
[3:22:32]
some some work, but I'm going to need uh
[3:22:35]
anything over $50,000 I need to come to
[3:22:38]
you. But I do have some money in the
[3:22:40]
budget to hire um this firm that is very
[3:22:43]
experienced that um I can hire them on a
[3:22:46]
t time and materials basis with the with
[3:22:49]
the uh the priority being to help us
[3:22:54]
evaluate these submitts and one of the
[3:22:57]
submitts was Gendler. Gendler was one of
[3:22:59]
the submitts. So to be able to um
[3:23:02]
evaluate this, they work with cities up
[3:23:06]
and down the state that can help us um
[3:23:09]
come up with some options. So, I could
[3:23:13]
bring forward to the council um we could
[3:23:16]
uh an option an evaluation option
[3:23:19]
because as I mentioned some cities might
[3:23:22]
want to have a couple of other people
[3:23:24]
from either maybe a subcommittee of the
[3:23:27]
council or a few people from the
[3:23:29]
community or perhaps Miss Buckingham,
[3:23:31]
she's on your ADR kind of look at these
[3:23:34]
architectural these submitts and help us
[3:23:37]
narrow it down to two or three or some
[3:23:41]
um manageable um number to bring forward
[3:23:44]
to the council for you to view. I want
[3:23:46]
to remind you this contract for an
[3:23:49]
architectural engineering firm is going
[3:23:51]
to be one and a half to $2 million and I
[3:23:56]
look to Mr. Weiny for confirmation that
[3:23:58]
that's kind of in the
[3:24:00]
>> That's correct.
[3:24:02]
>> Yeah.
[3:24:02]
>> Thank you.
[3:24:04]
I think it's one of the reasons that it
[3:24:06]
might be beneficial to potentially break
[3:24:09]
it up and to at least get into
[3:24:11]
schematics and then
[3:24:13]
>> get some clarification because I think
[3:24:15]
that number
[3:24:16]
>> both from an architectural and
[3:24:18]
engineering standpoint standpoint could
[3:24:20]
be
[3:24:20]
>> tightened up. Right. The more
[3:24:22]
information the better.
[3:24:23]
>> Yeah.
[3:24:24]
>> So, um I will
[3:24:27]
so I'm you know the council meets once a
[3:24:30]
month. Um, I know that there are there
[3:24:32]
are several uh time constraints in the
[3:24:34]
month of May. I know of a council member
[3:24:37]
who has as a constraint and I know that
[3:24:39]
a couple members of this committee have
[3:24:41]
constraints in May, but um so this gives
[3:24:45]
us time through the month of May to work
[3:24:48]
on this evaluation.
[3:24:50]
Your next meeting is June 11th. come
[3:24:52]
forward at that meeting with, I don't
[3:24:55]
know, a short list or
[3:24:58]
recommendation or or a couple of options
[3:25:01]
on how to how to conduct this
[3:25:03]
evaluation, then we're going to need to
[3:25:06]
spend quite a bit of time coming up with
[3:25:10]
a scope of work because a $2 million
[3:25:14]
scope of work, we don't we don't want to
[3:25:16]
have uh a lot of these infamous change
[3:25:19]
orders, which don't just apply to
[3:25:21]
contractors. They apply to architects
[3:25:23]
and I'm going to look to Mr. Whiny.
[3:25:28]
» Yes.
[3:25:28]
>> But yes, the answer is do we need a
[3:25:30]
detailed scope of work?
[3:25:32]
>> Yes. And the more detailed the better,
[3:25:35]
right? And the more information the
[3:25:37]
better because then we're going to get
[3:25:39]
good numbers and we're going to have
[3:25:40]
close any gaps or any holes because many
[3:25:45]
architects will not ask questions
[3:25:48]
because they know that there's missing
[3:25:50]
aspects of the scope which allows them
[3:25:53]
and an engineer and other consultants
[3:25:54]
that come back later and say, "Oh, well
[3:25:57]
that's an additional service. Oh, you
[3:25:59]
didn't tell us that." So I think
[3:26:00]
spending the time to really go through
[3:26:02]
and hammer out a very detailed scope is
[3:26:05]
going to be really beneficial. It's good
[3:26:07]
for the consultants as well. Right.
[3:26:09]
>> Okay. Thank you. So um so that process
[3:26:13]
is going to take time and then
[3:26:15]
absolutely a $2 million contract. This
[3:26:18]
needs to come to the council. And one of
[3:26:20]
the things that I haven't heard much of
[3:26:22]
this evening,
[3:26:24]
public input. You you had a lot of
[3:26:28]
public input. you had a year's worth of
[3:26:30]
public input when you put together your
[3:26:32]
facility's master plan. You need to have
[3:26:34]
public input on amending your master
[3:26:37]
plan. And of course, this group has you
[3:26:40]
guys have been meeting um you have not
[3:26:42]
had public input at your meetings.
[3:26:45]
You I'm sure have a good feel for what a
[3:26:47]
lot of members of the public, but you
[3:26:49]
haven't you you have to ask you have to
[3:26:50]
give people the opportunity to come and
[3:26:53]
speak to the council and provide input.
[3:26:56]
So um and then so we need to get an
[3:26:59]
architect on board. We get an architect
[3:27:02]
on board the AR and the one of the first
[3:27:04]
things the architect could do okay
[3:27:06]
schematic designs but they could also
[3:27:08]
the council needs you're going to need
[3:27:09]
to amend your facilities master plan and
[3:27:12]
I identified in my memo this afternoon
[3:27:15]
some things that need to be worked out.
[3:27:16]
I'm very confident that we can spend
[3:27:19]
time working those things out and um and
[3:27:23]
then to get to and we absolutely agree
[3:27:26]
that you know in in order to get to kind
[3:27:29]
of that 30% schematic design drawings.
[3:27:32]
That's what we need in order to be able
[3:27:34]
to get that cost estimate that will then
[3:27:36]
help us you know a more specific cost
[3:27:39]
instead of a range. a more specific cost
[3:27:41]
estimate that then we can turn over to
[3:27:44]
our town attorney's office and to come
[3:27:48]
up with that language for a ballot
[3:27:50]
measure and be and and at the same time
[3:27:53]
concurrently we need to be working on
[3:27:55]
getting an environmental consultant on
[3:27:57]
board
[3:27:59]
and we need to be working with um with
[3:28:04]
political consultants
[3:28:07]
with um um bond council with our town
[3:28:10]
attorney's office, our town treasurer
[3:28:13]
working on um coming up with crafting a
[3:28:18]
measure that ultimately the council
[3:28:21]
needs to you need to take action to put
[3:28:24]
this on the on the ballot. So, um that
[3:28:27]
is not going to happen in time for you
[3:28:29]
to make the November agenda November
[3:28:32]
ballot. I was really happy to learn
[3:28:34]
today that you can do it. I know there's
[3:28:37]
some I know the c some council members
[3:28:40]
have talked about, you know, it's
[3:28:41]
probably better to do it a general
[3:28:42]
election, but you can do it a special
[3:28:44]
election. There's four special elections
[3:28:46]
next year. Um, and I think that there's
[3:28:50]
a lot there's a lot of work to be done
[3:28:51]
in this coming in this coming summer and
[3:28:54]
fall fall. And I know we can all roll up
[3:28:56]
our sleeves and get it done. And I'm
[3:28:58]
excited about this idea. I just want to
[3:29:01]
make sure that this plan, as Mr. Weine
[3:29:04]
said in the beginning of his comments of
[3:29:06]
this presentation is this plan needs to
[3:29:09]
meet the operational
[3:29:12]
objectives of our town departments
[3:29:16]
because you are going to be using I mean
[3:29:19]
whether it's 22 to 26 to you're going to
[3:29:22]
be using a ton of public funds
[3:29:26]
to build this project. It has to be done
[3:29:28]
well and it has to meet the needs of our
[3:29:30]
organization and we provide services to
[3:29:33]
the community. So I think that was was
[3:29:36]
that giving you an eye that's kind of
[3:29:37]
what I'm looking at as being a a
[3:29:39]
timeline. Um
[3:29:41]
>> that's helpful.
[3:29:42]
>> Okay.
[3:29:44]
Thank you.
[3:29:44]
>> Um
[3:29:46]
is does anyone have any questions other
[3:29:49]
questions for Christa or should we move
[3:29:50]
on to public comment?
[3:29:53]
Let's move on to public comment. Anybody
[3:29:55]
in the um chamber who would like to make
[3:29:59]
public comment?
[3:30:12]
» Good evening. Uh Michael Rosenb 14
[3:30:15]
Avenue Ross. Madame Mayor and fellow
[3:30:18]
council members, first of all, thank you
[3:30:19]
to the citizens advisory committee. I'm
[3:30:22]
here to express my profound concern over
[3:30:25]
the path for has forced upon our town,
[3:30:28]
especially now that the uh the citizens
[3:30:31]
advisory committee report makes it clear
[3:30:34]
that the end result was inevitable. This
[3:30:36]
ad hoc report serves as a formal
[3:30:38]
acknowledgement of FORF's own admission.
[3:30:41]
Staffing and maintaining a fully
[3:30:43]
functional fire department at the Ross
[3:30:45]
Civics complex is no longer a realistic
[3:30:48]
objective. For almost a year, FORF has
[3:30:52]
disseminated misinformation that has
[3:30:54]
fractured our community and compromised
[3:30:56]
the town of Ross's standing with various
[3:30:59]
Marin County agencies. As a result,
[3:31:02]
significant taxpayer resources and
[3:31:05]
administrative efforts have been
[3:31:06]
squandered on evaluated proposal and a
[3:31:09]
ballot initiative that were proven
[3:31:11]
untenable from the start.
[3:31:13]
In my view as a Ross resident,
[3:31:15]
accountability is essential and should
[3:31:17]
start with a formal written apology from
[3:31:19]
fourth. Furthermore, considering their
[3:31:21]
status as a 501c4,
[3:31:23]
I strongly encourage the town of Ross to
[3:31:25]
demand a full restitution of all
[3:31:27]
municipal expenses from fourth financial
[3:31:29]
reserves. The people of Ross are
[3:31:31]
entitled to a swift resolution to this
[3:31:33]
matter, beginning with a public apology
[3:31:35]
and complete financial reimbursement.
[3:31:38]
While it is my hope that Fourth can
[3:31:40]
persuade their supporters to endorse the
[3:31:41]
town's bond financing, such an outcome
[3:31:44]
may prove elusive. Once their community
[3:31:47]
realizes they have been misled and
[3:31:49]
realizes there's no new fire engine is
[3:31:51]
forthcoming, nor will the response time
[3:31:53]
lessen in the foreseeable future. Fourth
[3:31:56]
may find their support increasingly
[3:31:57]
untenable. Although council members are
[3:32:00]
restricted from responding during public
[3:32:02]
comments, I believe that council members
[3:32:04]
Salter and Robins should take this
[3:32:05]
opportunity to officially express regret
[3:32:08]
for enabling actions that disregarded
[3:32:10]
prior council mandates and for their
[3:32:12]
association with the dissemination of
[3:32:14]
unreliable information that needlessly
[3:32:16]
drew out this process.
[3:32:21]
» Thank you. Anyone else in the chamber
[3:32:24]
for public comment?
[3:32:31]
No one's online.
[3:32:44]
» Sorry. Um, two two things. Um, I think
[3:32:48]
we should, we don't have a resolution or
[3:32:52]
a vote, but I think we should each opine
[3:32:55]
about whether we like this concept or we
[3:33:00]
want to go with a different concept. And
[3:33:02]
then two, and we can break this up if if
[3:33:05]
we want. Um, two,
[3:33:08]
does the does the next steps that
[3:33:10]
Christa has outlined, do those make
[3:33:12]
sense?
[3:33:14]
Um, so I will I can go first. I love the
[3:33:17]
concept. I think it's beautiful. I I
[3:33:20]
think it, you know, it's the building is
[3:33:23]
gorgeous. It's a legacy building. I
[3:33:27]
think you you the committee nailed what
[3:33:30]
needed to happen. Um and I'm confident
[3:33:33]
that a lot of the issues that are
[3:33:37]
unresolved can be resolved um by staff
[3:33:40]
working collectively, collaboratively.
[3:33:43]
Um, in terms of next steps, um, I would
[3:33:46]
like to get an architect hired as soon
[3:33:48]
as possible. Maybe we could have a
[3:33:50]
special meeting if, um, if we're
[3:33:53]
prepared to have a special meeting in
[3:33:54]
early June to to get going. Um, I I
[3:33:58]
don't see how, unfortunately, we can
[3:34:00]
make the, um, the November ballot. I and
[3:34:05]
I don't want to be I don't want to have
[3:34:08]
missteps. I don't want to have to ask
[3:34:10]
the voters later um, for more money. I
[3:34:12]
don't want to have this blown in an
[3:34:15]
election. I think we want to do this
[3:34:17]
once and we want to do it really well.
[3:34:19]
Um, so I I I think that's Yeah. Next
[3:34:24]
steps. Okay.
[3:34:27]
Can I just say ditto?
[3:34:28]
>> No. Okay. Um, I actually love the
[3:34:31]
conceptual design. I love the one
[3:34:33]
building. I think that's I love it being
[3:34:36]
double story. I think it's going to be
[3:34:39]
beautiful in relationship to the housing
[3:34:42]
that's going to be close by. Um there's
[3:34:44]
so many advantages to the design that's
[3:34:47]
been set out and I I too agree that we can I think by having uh the staff
[3:34:53]
work with some of the the citizens to
[3:34:57]
come up to to work through some of the
[3:34:59]
problems, we'll get through them. I'm
[3:35:02]
confident we can do that. Um, and I
[3:35:05]
think we most likely I also think that
[3:35:07]
the steps that Christa outlined are
[3:35:09]
important. I think one of the other
[3:35:11]
steps might be that we need to have a
[3:35:13]
chat with paramedics.
[3:35:16]
Yeah. So that we can bring them along so
[3:35:19]
that they're part of this and see the
[3:35:22]
value and the beauty of this one
[3:35:24]
building. So yeah.
[3:35:33]
Yes, agree with these comments. Great, job. Thank you so much, everyone.
[3:35:38]
Uh, makes a lot of sense. I'm I'm fully
[3:35:40]
supportive of the concept
[3:35:43]
and, uh, like Julie and Terry, I think
[3:35:45]
that we have issues that can be worked
[3:35:47]
out. Skeptical about the time frame. I
[3:35:50]
hope we can have it on the November
[3:35:52]
ballot. Um,
[3:35:55]
that that would be more desirable uh,
[3:35:58]
for a couple of reasons. I think it has
[3:35:59]
a better chance actually of passing on
[3:36:01]
the November ballot. U but um if we
[3:36:05]
can't, we can. We'll we'll shoot for as
[3:36:08]
soon as we can next year. Uh but
[3:36:10]
otherwise, no, I'm I'm fully in favor of
[3:36:13]
moving it ahead and uh getting
[3:36:16]
architects on board and getting a
[3:36:19]
consultant to help us get the right
[3:36:21]
architects and the right proposal and
[3:36:24]
whatever else we need to do. Um, in the
[3:36:26]
meantime,
[3:36:30]
» so it's baseball season, everybody, and
[3:36:33]
my two boys play a lot of baseball. And
[3:36:37]
uh, this this whole situation reminds me
[3:36:39]
of the Kirk Gibson home run in 1988
[3:36:42]
where uh, Vince Scolley said, "In a year
[3:36:46]
that was so improbable,
[3:36:49]
the impossible has happened." So, first
[3:36:53]
I want to thank this committee for
[3:36:55]
coming together and making the
[3:36:57]
impossible possible.
[3:37:00]
Um, there's been a lot of discussion
[3:37:03]
about the fire station
[3:37:05]
and that I I there's all these issues
[3:37:07]
that get conflated, but the first and
[3:37:09]
foremost issue that had to be solved
[3:37:11]
piece by piece was is it possible to
[3:37:15]
rebuild? Okay, if you can't rebuild it,
[3:37:18]
there's really no point in anything
[3:37:19]
else. And the the answer before us today
[3:37:22]
is 100% we can rebuild a fire station
[3:37:25]
here. It can fit and it's cost-effective
[3:37:28]
to build it. And that uh was not really
[3:37:32]
uh answered up until before your
[3:37:35]
committee formed. It was told that this
[3:37:37]
was absolutely impossible. So, first of
[3:37:39]
all, thank you for coming together and and explaining that. I also want to
[3:37:43]
thank the friends of the Ross Firehouse
[3:37:46]
for their and the members on this
[3:37:48]
committee. uh Bob Herps and Ed Dong for
[3:37:52]
bringing forth to this community this
[3:37:55]
notion that this is possible, okay? That
[3:37:58]
it's possible, that you can build this
[3:38:01]
fire station and you could afford it
[3:38:02]
because again, this community was ready
[3:38:04]
to demolish everything around us and
[3:38:07]
move forward. And that um that
[3:38:10]
perseverance is so important in a
[3:38:13]
community that cares so deeply about
[3:38:16]
this issue. And so I really want to
[3:38:18]
thank the members of that that group for fighting all the way here.
[3:38:23]
The last uh point I want to make is it's
[3:38:27]
very nice because we we said there's a
[3:38:30]
shell of a building, but maybe it will
[3:38:32]
have a fire station, maybe it won't. I
[3:38:34]
don't know. And so everybody loves the
[3:38:36]
shell. Well, there's a talk about this this ballot initiative. I actually
[3:38:42]
think it's great we have it because you
[3:38:44]
guys keep working your your way through
[3:38:46]
it. We can have the the town vote and
[3:38:49]
decide what which plan they want. Do
[3:38:51]
they want the fire station or not in
[3:38:53]
November. It's not that far away to
[3:38:55]
really make that decision and put this
[3:38:57]
to bed. And it will be a Democratic
[3:38:59]
vote. Everybody will have their say.
[3:39:01]
Everybody would say, "I can't afford it.
[3:39:03]
We can't afford the operations."
[3:39:04]
Whatever your opinion may be, let the
[3:39:06]
people vote and then it will be done
[3:39:09]
because we will have said instead of us
[3:39:11]
five trying to read and understand what
[3:39:13]
everyone says, they get to vote and
[3:39:15]
inform us and then we move forward and
[3:39:16]
say that the democratic process happened
[3:39:18]
and nobody wanted it. So we we built a
[3:39:21]
senior center. But if they do want a
[3:39:23]
fire station, then I think we need to
[3:39:24]
accept that and use the programming and
[3:39:26]
the time to to come together to make
[3:39:28]
that a reality. So I view the uh ballot
[3:39:32]
initiative again. Thank you friends of
[3:39:33]
Ross Firehouse and thank you to all the
[3:39:35]
people that signed that petition because
[3:39:37]
I think it's a useful tool in this
[3:39:39]
process going forward to get what the
[3:39:42]
people really really want out of this.
[3:39:44]
So again, just to summarize, thank you
[3:39:47]
from, you know, as a citizen, thank you
[3:39:49]
so much. We are so lucky to have the
[3:39:53]
resources in this room and on this
[3:39:55]
committee. It's unbelievable. And it's
[3:39:59]
something I've said for a long time. We
[3:40:01]
need to stop uh just staying using our
[3:40:03]
staff and staff is so small on this
[3:40:06]
town, but the resources of the town's
[3:40:08]
people is so big. Let's tap those
[3:40:10]
resources. Let's continue to use them.
[3:40:13]
And you see the magic that can happen in
[3:40:15]
two months. I know it's a long way to
[3:40:18]
go, but if they can do this much in two
[3:40:20]
months, I can see this really coming
[3:40:22]
together in a very short time. So, thank
[3:40:25]
you and I appreciate all the work and I
[3:40:27]
hope you continue to be a part of this
[3:40:29]
process moving forward.
[3:40:34]
» So, for the first um question about the
[3:40:36]
proposal,
[3:40:39]
um I think it's wonderful. Um
[3:40:43]
I think it's hard to not
[3:40:46]
see that it has it has something for
[3:40:48]
everyone. It really meets everyone's
[3:40:50]
needs. It it it addresses the interest
[3:40:53]
in having the paramedics stay here. It
[3:40:56]
addresses the possibility of a fire
[3:40:58]
station. It addresses the desperate need
[3:41:00]
for new town offices and police um
[3:41:04]
facilities.
[3:41:06]
Uh and it's beautiful. So I I I think
[3:41:09]
that it will be very I'm hopeful that there will be widespread support. I it's hard to see that there wouldn't
[3:41:15]
be because the town needs this and it's
[3:41:18]
very beautiful and it leaves room for um
[3:41:22]
different programs that people are
[3:41:23]
interested in. Um I think that um you
[3:41:27]
know there was a comment about you know
[3:41:29]
that that it's hasty to just
[3:41:34]
approve this instead of our current
[3:41:35]
plan. You know again our current plan
[3:41:38]
hasn't gone anywhere. I don't think we
[3:41:41]
should be hasty, but I think that this
[3:41:43]
is so much better than concept B that uh
[3:41:46]
I think we should move forward fairly
[3:41:48]
quickly. We can have some some very good
[3:41:50]
outreach. So, for example, next week
[3:41:52]
there should be a very thorough article
[3:41:55]
about what this entails, what this
[3:41:57]
proposal is, and the article can be
[3:42:00]
taken almost directly from the uh slide
[3:42:03]
deck that the committee gave us. And I
[3:42:05]
think that that would be a very useful
[3:42:07]
way of of sharing with the community
[3:42:09]
what what this is. RPOA could also have
[3:42:12]
a a meeting focused on the new proposal
[3:42:15]
or could have as one of its agenda items
[3:42:17]
um this proposal uh andor uh by way of
[3:42:22]
education not uh advocating but uh send
[3:42:25]
out an email um about this proposal. The
[3:42:28]
town could also send out an email. So I
[3:42:30]
think that the outreach doesn't have to
[3:42:32]
take months of public meetings. I think
[3:42:35]
it can be done very quickly um online
[3:42:38]
and by email and with some uh and by the
[3:42:42]
with the Ross review.
[3:42:44]
Um as as far as the next steps um I I
[3:42:48]
think we should move very quickly to to
[3:42:50]
get this to make this happen. I I think
[3:42:52]
we should try for the November ballot,
[3:42:54]
but it's it's comforting to me to know
[3:42:57]
that March is an option. Um because that
[3:43:01]
doesn't delay us that much. And I think
[3:43:02]
that would keep the building program
[3:43:04]
pretty much on schedule to keep the
[3:43:06]
paramedic station um uh on on track. Um,
[3:43:11]
I think as far as how we do it, I mean,
[3:43:12]
I recognize we're a council town manager
[3:43:16]
um, structure, but I would hope that
[3:43:18]
this committee can remain front and
[3:43:20]
center uh, with all of the decisions
[3:43:24]
because they're just so um, uh,
[3:43:29]
experienced and also they're very
[3:43:32]
willing to work on this and based on
[3:43:35]
what's happened in the first two months,
[3:43:36]
their work is phenomenally successful. I
[3:43:38]
mean, as I said before, they've they've
[3:43:40]
transcended politics and personalities
[3:43:42]
and come up with a very beautiful plan.
[3:43:45]
Um, and I would hope that if our next
[3:43:48]
step, if our first step is to hire an
[3:43:49]
architect, I would hope that the
[3:43:51]
committee can um be part of that group
[3:43:54]
that's that's evaluating the proposals
[3:43:57]
because I think that the committee has
[3:43:59]
more experience than almost, you know,
[3:44:02]
any single person we might hire and
[3:44:04]
certainly any any, you know, any any
[3:44:06]
other group. I mean we have just an
[3:44:08]
amazing committee of of experienced
[3:44:10]
talented people. So I think it's really
[3:44:12]
important to keep them front and center
[3:44:14]
with all decisions. Um and you know you
[3:44:18]
know the the the town manager of course
[3:44:20]
implements the decisions and runs things
[3:44:22]
but the council you know is ultimately
[3:44:24]
responsible. So I I you know my my next
[3:44:28]
steps would be hire an architect uh and
[3:44:31]
then but keep the committee front and
[3:44:33]
center for all of these steps moving
[3:44:35]
forward.
[3:44:38]
I Matt, I have a follow-up question. Are
[3:44:40]
you proposing that there be on the
[3:44:42]
November ballot a parcel tax asking
[3:44:44]
residents to tax themselves to have fire
[3:44:48]
services in Ross? Is that what you're
[3:44:50]
saying?
[3:44:52]
>> No, no, the ballot initiative, sorry,
[3:44:54]
it's already the ballot initiative that
[3:44:56]
the fourth has that has been approved.
[3:44:58]
It's on the November ballot and all it
[3:45:00]
says is should there be should the town
[3:45:03]
have basically facilities to support a
[3:45:06]
fire station? Yeah. A working fire
[3:45:09]
station. So the what I'm saying is it's
[3:45:11]
already on the ballot. So in terms of
[3:45:13]
this moving forward then we would have
[3:45:15]
an answer of what we should be building
[3:45:18]
in this box because the people will have
[3:45:21]
answered that.
[3:45:21]
>> But but didn't didn't force say if we
[3:45:24]
commit to this they would rem remove it.
[3:45:26]
I mean, isn't that a decision for Fourth
[3:45:29]
to make?
[3:45:30]
>> Of course, it's a decision, but I think
[3:45:31]
the fourth people all are under the
[3:45:33]
impression that committing to this is
[3:45:34]
committing to a fire station, but that
[3:45:36]
doesn't sound like what we heard today.
[3:45:38]
So,
[3:45:42]
» everyone who signed the petition wants
[3:45:44]
to be able to vote for a fire station.
[3:45:46]
So, there I don't think anyone's pulling
[3:45:48]
that back if we're just committing to a concept that's a box, but we don't
[3:45:52]
know what's inside it. Yeah, I I agree
[3:45:55]
that they signed the petition. It just
[3:45:57]
seems like they don't really know what
[3:45:59]
it means to have a fire station and pay
[3:46:02]
for the operations of a fire station.
[3:46:04]
So, to me, the initiative is kind of a
[3:46:06]
hypothetical
[3:46:08]
because the town doesn't have the money
[3:46:10]
to pay for fire services. Um, and you
[3:46:14]
know, maybe we need to have an offline
[3:46:17]
conversation with Bob to see how how
[3:46:20]
committed he feels like we are. Um, I
[3:46:23]
think there's still an opportunity to
[3:46:25]
talk about BORF pulling its initiative.
[3:46:28]
I don't think that's ended. That would
[3:46:31]
be something that I would prefer because
[3:46:35]
otherwise it's it's I mean, who would
[3:46:38]
vote no? If you have no concept of how
[3:46:41]
much it's going to cost you, why would
[3:46:43]
you vote no? It's kind of like, why
[3:46:45]
wouldn't you sign the petition if you
[3:46:47]
don't know how much it's going to cost,
[3:46:49]
right? It's kind of just a feel-good
[3:46:51]
moment. So, I'm optimistic that maybe we
[3:46:55]
can have some offline conversations with
[3:46:58]
the four people and um explore that. Um
[3:47:05]
>> I really hope that that's not on the
[3:47:08]
ballot because that is going to be
[3:47:10]
completely at cross purposes to what
[3:47:12]
we're trying to do. We're trying to get
[3:47:14]
everybody to come together, but that
[3:47:16]
ballot initi initiative is it's
[3:47:20]
mandatory. We have to do it and we know
[3:47:22]
we don't have the money to do it. So,
[3:47:24]
there would have to be some opposition
[3:47:26]
pointing that out and that's just going
[3:47:28]
to cut against trying to all come
[3:47:30]
together and get this passed. I can't
[3:47:32]
imagine why that should be on the
[3:47:34]
ballot.
[3:47:35]
>> I think the best way to
[3:47:37]
>> this is on the ballot. So, it's not a
[3:47:39]
hypothetical. It was voted on by the
[3:47:41]
people. this they they they they put
[3:47:44]
this petition forward and it has the
[3:47:47]
support of the community. All the
[3:47:48]
initiative asks is for the community to
[3:47:50]
vote yes or no. And so I will say this
[3:47:53]
in a campaign all these issues that
[3:47:56]
you're bringing up that it's too
[3:47:58]
expensive, no one can pay for it, then
[3:48:00]
people will vote no. So I you know I
[3:48:03]
don't I don't know why everyone's so
[3:48:04]
worried about this this initiative. I
[3:48:06]
actually think it's it's it's going to
[3:48:08]
help us make our decision because all
[3:48:10]
the things you're pointing out you're going to say we can't we don't
[3:48:13]
have the money. We can't afford to
[3:48:14]
operate it.
[3:48:14]
>> I think if we
[3:48:16]
>> the point is it's on the ballot. There's
[3:48:18]
no you you're asking people to pull it,
[3:48:20]
but it's on the ballot.
[3:48:20]
>> The agenda item tonight. It's not about
[3:48:22]
pulling or not pulling the or trying to
[3:48:24]
get the proponents to pull or not pull
[3:48:27]
the ag the initiative. It's next steps
[3:48:29]
as far as moving forward with the
[3:48:32]
concept that's been brought before you.
[3:48:34]
So obviously it's implicated and you're
[3:48:36]
hoping some council members are hoping
[3:48:38]
that it would be pulled. We can't get it
[3:48:40]
back and forth about the merits of the
[3:48:42]
initiative.
[3:48:43]
>> And I think the best next step to bring
[3:48:45]
people together is to move as quickly as
[3:48:48]
we can with this plan which I think is going to be very wellreceived and we
[3:48:52]
have a wonderful committee working on it
[3:48:54]
for us.
[3:48:56]
>> Can I just make a comment?
[3:48:58]
Elizabeth, I agree with you. The the the
[3:49:00]
committee has been phenomenal. In two
[3:49:03]
months, they've come up with just a
[3:49:05]
beautiful conceptual design. I think if
[3:49:08]
we're moving forward, I think the um
[3:49:12]
it's the town manager
[3:49:15]
working with some of the citizens to
[3:49:17]
come up with to deal with some of the
[3:49:20]
issues, but it really is in the hands of
[3:49:22]
our staff now to move forward with the
[3:49:26]
help of the citizens.
[3:49:28]
>> I mean, with the help of the citizens
[3:49:30]
committee.
[3:49:31]
>> Oh, the help of the citizens committee
[3:49:33]
or other people that you may want to
[3:49:34]
pull in.
[3:49:35]
>> I just wouldn't want to. I mean, you
[3:49:37]
just have this amazing group. I mean, I
[3:49:39]
think the key is keep I mean, I I think
[3:49:42]
they will help sell this more than any
[3:49:44]
change in a committee, unless they need
[3:49:46]
to bring in some people.
[3:49:47]
>> I think Christa would I I would trust
[3:49:49]
Christa to to work with people to make
[3:49:52]
it happen.
[3:49:54]
I there I what I like about the working
[3:49:58]
especially with the committee is that
[3:50:00]
they've really gone beyond all of the
[3:50:02]
politics of it, all the personalities.
[3:50:05]
And I think that of course they'll be
[3:50:07]
working with Christa. Of course they'll
[3:50:08]
be working with a project manager. We
[3:50:10]
hired a project manager. That's the
[3:50:11]
whole point.
[3:50:12]
>> But you know I I don't think we can pull
[3:50:14]
this off without these guys. I think we
[3:50:17]
need them.
[3:50:17]
>> I think it's a staff and citizens
[3:50:19]
working together.
[3:50:22]
>> Okay. I think we have exhausted this
[3:50:24]
topic. Um,
[3:50:27]
thank you committee. You you guys are
[3:50:30]
tremendous and we really owe you a huge
[3:50:32]
debt of gratitude especially for doing
[3:50:35]
this so quickly and so beautifully. So,
[3:50:39]
thank you.
[3:50:48]
» Can I make one more comment? It's just
[3:50:49]
that if we want to move this forward,
[3:50:52]
it's it should not be seen as difficult
[3:50:54]
to have a special meeting from time to
[3:50:56]
time. It only takes a 24-hour notice.
[3:50:59]
Council members, at least one or two,
[3:51:00]
can zoom in. It's very easy to arrange,
[3:51:03]
especially if we have things to approve.
[3:51:05]
You know, not a lot to discuss, but
[3:51:06]
things to approve that we want to move
[3:51:07]
forward on. We should all be available
[3:51:10]
for special meetings.
[3:51:11]
>> I think I mentioned that in my remarks,
[3:51:13]
too. Special meeting. Um, okay. Now
[3:51:17]
we're moving on to number
[3:51:21]
13. Town council to consider approval of
[3:51:24]
the town of Ross annual financial report
[3:51:27]
for the year ended June 30, 2025 with no
[3:51:31]
findings.
[3:51:33]
Town manager Johnson.
[3:51:34]
>> Yes. Uh thank you mayor and council
[3:51:36]
members. Uh the item before you tonight
[3:51:39]
is just as the mayor just described it.
[3:51:42]
Um, you know, each year the town engages
[3:51:45]
the services of an independent auditor
[3:51:47]
to pre prepare an audit of the town's
[3:51:49]
financial statements. Mr. Nathan Edelman
[3:51:52]
was the partner in charge of this audit
[3:51:54]
and he will provide a brief presentation
[3:51:56]
via Zoom. Hopefully, he's still still
[3:51:59]
there. It's a little bit later than we
[3:52:00]
thought it was going to be. Um, do you
[3:52:03]
see Mr. Edelman?
[3:52:06]
>> I and I I'm here if you can hear me.
[3:52:08]
>> Oh, thank you. Thank you for hanging out
[3:52:11]
with us this through this evening,
[3:52:13]
Nathan.
[3:52:14]
>> I'm still here. Okay,
[3:52:15]
>> I'm gonna hand it over to you if that's
[3:52:16]
okay, mayor and council.
[3:52:18]
>> Yes.
[3:52:18]
>> Okay, take it away.
[3:52:21]
>> All right, thank you. Let me share my
[3:52:24]
screen.
[3:52:26]
Okay, I hope that is up.
[3:52:30]
Take a
[3:52:32]
excuse me, we'll take a quick turn and
[3:52:35]
talk about accounting for a few minutes.
[3:52:38]
My presentation is brief,
[3:52:41]
but good afternoon or I should say good
[3:52:43]
evening. My name is Nathan Edelman with
[3:52:45]
ID Bailey. I am the independent external
[3:52:49]
auditor and I'm going to just really
[3:52:51]
give you an overview of the audit. It is
[3:52:54]
intended to be concise and really just a
[3:52:57]
10,000 foot executive overview of
[3:53:01]
results of the audit and the the scope
[3:53:04]
of of the audit.
[3:53:07]
Yeah.
[3:53:11]
the bottom line results. So, this slide
[3:53:13]
is really the end result of of the audit
[3:53:16]
and it's it's I I'll call it good news,
[3:53:18]
but the bottom line is that the town
[3:53:20]
received an unmodified what we call a
[3:53:23]
clean opinion on the financial
[3:53:25]
statements on an internal controls over
[3:53:28]
financial reporting. We identified no
[3:53:30]
significant deficiencies or material
[3:53:33]
weaknesses
[3:53:35]
for the GAN appropriations limit. We
[3:53:37]
noted no exceptions. And really what all
[3:53:40]
that means in in practical terms is that
[3:53:43]
really the the financial statements that
[3:53:45]
were previously presented, I'll talk
[3:53:46]
about the scope in in a second, but it
[3:53:49]
means that the financial statements
[3:53:50]
previously presented are accurate, that
[3:53:53]
they are complete.
[3:53:56]
really we we identified no reportable
[3:53:58]
issues in in the areas that we that we
[3:54:01]
tested which is is the stuff here
[3:54:05]
>> what is it that we when I actually say
[3:54:07]
audit what is it that that we did the
[3:54:10]
audit covers the the scope covers the
[3:54:12]
town's fiscal year 2025 financial
[3:54:15]
statements and related disclosures and
[3:54:18]
really that means auditor goes in and verifies you know cash and payables
[3:54:23]
receivables
[3:54:25]
how much money is sitting in the bank as
[3:54:27]
of that cuto off period. That's what the
[3:54:30]
auditor is is looking to to verify.
[3:54:35]
We look at internal controls relevant to
[3:54:38]
financial reporting as as part of
[3:54:40]
planning the audit and where where
[3:54:42]
procedures are performed over that the GAN appropriations calculation focus
[3:54:47]
is not so much on the debits and credits
[3:54:49]
not about the accounting but really
[3:54:51]
about the accuracy of of the
[3:54:54]
calculation.
[3:54:55]
And I I always just say our our role as
[3:54:58]
auditors is to ask the questions. We
[3:55:01]
look at source documents, but really the
[3:55:03]
auditor is simply a reporter just
[3:55:06]
reporting back the results of of the
[3:55:08]
audit. You know, management of the town,
[3:55:11]
which I I guess is Christa in in this
[3:55:13]
case, and you know, really the folks in
[3:55:16]
the accounting department, which I
[3:55:18]
realize for you is is one person, but
[3:55:21]
they are responsible for, you know,
[3:55:23]
supporting the audit. They have to
[3:55:25]
compile the accounting records. They
[3:55:27]
have to send out confirmations. they
[3:55:29]
need to answer our our questions. All we do is report back, but the people
[3:55:35]
or the person in the in the accounting
[3:55:38]
department is really the one that has to
[3:55:40]
do what I'll call is is is the hard work
[3:55:45]
and then other other required
[3:55:47]
communications. Audit audit standards
[3:55:49]
say that we are required to communicate,
[3:55:51]
you know, several items to those charged
[3:55:53]
with governance. And really in in short,
[3:55:55]
there were no matters arising from the
[3:55:58]
audit that required additional
[3:56:00]
communications or additional attention
[3:56:03]
from the from the town council.
[3:56:06]
I'll just just close it with the the
[3:56:09]
audit is an after-the-act affirmation
[3:56:12]
that the financial information
[3:56:13]
previously presented to town council is
[3:56:16]
complete and accurate. Like I said, we rely on the accounting team to send
[3:56:21]
those confirmations. And in one of the bullets on here, audit difficulties,
[3:56:25]
and I'm pleased to report there were no
[3:56:28]
difficulties in in conducting the audit.
[3:56:30]
Everybody that we worked with is
[3:56:33]
supportive. Uh, excuse me, it's very
[3:56:35]
late. Everybody that we worked with is supportive of the audit and and they
[3:56:40]
get us what we need so that we can we
[3:56:42]
can get in and and and move on. So, with
[3:56:46]
that, I will let me stop sharing my
[3:56:49]
screen. Um, that that is my my
[3:56:52]
presentation and I'm happy to take any
[3:56:54]
questions from the from the council.
[3:56:57]
>> Thank you. And council members, any
[3:56:59]
questions?
[3:57:00]
Matt.
[3:57:01]
>> Um, so, uh, thank you. Did, did you look
[3:57:04]
at any of the internal controls? Was
[3:57:05]
that a part of this audit?
[3:57:08]
>> Yeah. So, in internal controls are
[3:57:10]
looked at as as part of the audit. And
[3:57:12]
if there are what we call control
[3:57:13]
deficiencies, significant deficiencies,
[3:57:15]
material weaknesses, those are things
[3:57:18]
that would be required to be reported as part of the results of the audit.
[3:57:23]
>> And sorry, so were any of those um
[3:57:25]
identified
[3:57:26]
>> there? And yes, there there were no
[3:57:29]
internal control deficiencies that we reported.
[3:57:33]
>> Great. Thank you.
[3:57:35]
>> There's no one in the chamber. Anybody
[3:57:38]
online for public comment?
[3:57:39]
>> No one online. Mayor,
[3:57:41]
>> do we need to have a motion?
[3:57:45]
» Yes, please. Just a comment. I mean,
[3:57:48]
it's great to have a clean audit,
[3:57:49]
especially as we're moving ahead
[3:57:51]
building, asking for money, you know, to
[3:57:54]
have to have a clean audit is fabulous.
[3:57:56]
So, thank you to the staff.
[3:57:58]
>> Yeah. And I have I have one comment to I
[3:58:00]
know it's late
[3:58:01]
>> at these financial things. We should
[3:58:02]
definitely bring him to the finance
[3:58:03]
committee, but again, this is such a a
[3:58:06]
gold star for our staff, especially when
[3:58:09]
we just hired a new accountant and we're
[3:58:12]
moving um from from the consultant to
[3:58:16]
just have a flawless audit come through
[3:58:18]
and no internal controls. These are
[3:58:21]
really, you know, these these are really
[3:58:23]
things to be proud of. and they don't
[3:58:25]
get all the the they don't get all the agilation, but it's it's really
[3:58:30]
impressive and I uh I wish we we gave it
[3:58:34]
the airtime it deserves. So that's why I
[3:58:36]
hope we sort of meet as a finance
[3:58:37]
committee a little more because these
[3:58:38]
are really really impressive and I'm
[3:58:41]
very thankful that that I know my town
[3:58:43]
has a clean audit, no no internal
[3:58:45]
controls issues and continues to show
[3:58:48]
surpluses and these these should be the
[3:58:50]
high, you know, I mean every other town
[3:58:52]
is struggling. They can't, you know,
[3:58:54]
Fairfax can't pave its roads. Like, it's
[3:58:56]
really, really, really impressive.
[3:58:58]
Really,
[3:58:59]
>> has big issues, too.
[3:59:01]
>> And it's not touted enough. I mean, of
[3:59:02]
course, the fire station and all the
[3:59:03]
fighting gets the news, but this is
[3:59:05]
really, really impressive.
[3:59:07]
>> But maybe that should be a Ross review
[3:59:08]
article. I mean, it's it's people should
[3:59:11]
know.
[3:59:11]
>> Yes,
[3:59:12]
>> absolutely. Yes, please.
[3:59:14]
>> So, I just want to say thank you to
[3:59:16]
Christa and your team.
[3:59:18]
>> Really good job. and I know it's ongoing
[3:59:21]
day in and day out throughout the year.
[3:59:23]
So,
[3:59:23]
>> thanks. I'll make sure to pass on your
[3:59:25]
comments, your kind words to our senior
[3:59:27]
accountant, Elena Carina, because she just started this past uh late June.
[3:59:33]
And um and we do appreciate the the the
[3:59:36]
ability also to be able to call on
[3:59:38]
Nathan, our auditor, to to ask some
[3:59:40]
questions from um time to time. So,
[3:59:44]
>> thank you.
[3:59:45]
>> We need a a motion to approve this.
[3:59:48]
>> Yes, please. So moved. Second.
[3:59:55]
» Council member Dalling.
[3:59:57]
>> Yes.
[3:59:58]
>> Council member Kercher.
[3:59:59]
>> Hi.
[4:00:00]
>> Council member Salter.
[4:00:01]
>> I.
[4:00:02]
>> Mayor Pro Tim Robbins.
[4:00:03]
>> I.
[4:00:04]
>> Mayor McMillan.
[4:00:05]
>> Yes.
[4:00:05]
>> Motion passes 5-0.
[4:00:08]
>> Thank you. The last item on our um
[4:00:11]
administrative agenda, item 14, is a
[4:00:15]
discussion regarding the wording of the
[4:00:18]
respectful dialogue section on town
[4:00:22]
council agendas.
[4:00:24]
>> Um thank you, mayor and council members.
[4:00:26]
I'd like to turn it over to our new town
[4:00:28]
clerk, Zach Koblick,
[4:00:31]
who uh prepared this agenda item and is
[4:00:33]
just going to give you a brief uh
[4:00:34]
presentation. So, thank you.
[4:00:37]
Christa. And good morning,
[4:00:39]
Mayor McMillan, or good evening, rather.
[4:00:42]
>> Mayor McMillan and members of the
[4:00:43]
council. My name is Zach Kobe, the town
[4:00:45]
clerk and senior management analyst. Uh
[4:00:48]
before the council tonight is a
[4:00:49]
discussion item regarding the language
[4:00:51]
in the respectful dialogue section of
[4:00:53]
the town council meeting agenda
[4:00:55]
template. Mayor Prom Robbins has
[4:00:57]
suggested that the council that the
[4:00:59]
section be revisited and the council
[4:01:01]
asked that it be brought back as a
[4:01:03]
discussion item. The purpose of the
[4:01:05]
these disclaimers, generally speaking,
[4:01:07]
is not punitive. They're meant to
[4:01:09]
they're not meant to shame anyone or to
[4:01:11]
respond to any specific past behavior.
[4:01:13]
Rather, they serve as a proactive
[4:01:14]
statement of expectations for everyone
[4:01:16]
participating in the meeting, council,
[4:01:18]
staff, and the public. The goal is to
[4:01:21]
encourage meaningful civic
[4:01:22]
participation,
[4:01:24]
uh protect the inclusion of diverse
[4:01:25]
perspectives, and minimize the kind of
[4:01:27]
disruption that can derail proceedings
[4:01:28]
or cause community members to hold back
[4:01:30]
from speaking. The town's current
[4:01:32]
language, which has been omitted from
[4:01:34]
tonight's agenda, but has been on the
[4:01:36]
past four or so agendas, is the same
[4:01:38]
language used by the Marin County Board
[4:01:39]
of Supervisors, and I'll read it in full
[4:01:41]
now. The Town Council of the Town of
[4:01:44]
Ross encourages a respectful dialogue
[4:01:46]
that supports freedom of speech and
[4:01:47]
values diversity of opinion. The town
[4:01:50]
council, staff, and members of the
[4:01:51]
public are expected to be civil and
[4:01:53]
courteous and to refrain from
[4:01:55]
questioning character or motives of
[4:01:57]
other participation of others
[4:01:59]
participating in the meeting. The town
[4:02:02]
expects that speakers will not use
[4:02:03]
threatening, profane, or abusive
[4:02:05]
language which which disrupts, disturbs,
[4:02:08]
or otherwise impedes the orderly conduct
[4:02:11]
of the town council meeting. Members of
[4:02:13]
the public may comment on any item on
[4:02:15]
the agenda during count town council
[4:02:17]
consideration of the item. The mayor
[4:02:19]
will invite public comments following
[4:02:21]
the staff presentation and prior to
[4:02:23]
final council deliberations. Each
[4:02:25]
speaker will be allotted time for for
[4:02:27]
comment as set by the mayor, generally
[4:02:30]
three minutes.
[4:02:32]
For reference, in tonight's discussion,
[4:02:34]
I reviewed how other jurisdictions in
[4:02:36]
Mering County approach this. The town of
[4:02:37]
Fairfax has a more detailed version that
[4:02:39]
addresses specific behaviors, applies
[4:02:41]
standards explicitly to all viewpoints,
[4:02:44]
and outlines a graduated response from a
[4:02:46]
warning to removal for disruptive
[4:02:48]
conduct. The city of Nevada similar
[4:02:51]
similarly has language establishing the
[4:02:54]
mayor's authority to remove disruptive
[4:02:56]
speakers and emphasizes a commit that
[4:02:59]
comments should be directed to the
[4:03:01]
council and address issues rather than
[4:03:03]
individuals. Several other marine cities
[4:03:05]
and towns including centerfell Sanelmo
[4:03:08]
larks corderea and salelo do not include
[4:03:11]
a section like this in their agendas at
[4:03:13]
all. All those comparisons are included
[4:03:15]
in the staff report for your reference.
[4:03:18]
The recommend the recommendation this
[4:03:20]
evening is simply for the council to
[4:03:22]
discuss the current language and provide
[4:03:24]
direction to the town manager on whether
[4:03:26]
it should be retained as is revised or
[4:03:28]
eliminated from the agenda template.
[4:03:30]
There are no financial impacts
[4:03:31]
associated with this item. And with
[4:03:33]
that, I'm happy to answer any questions
[4:03:34]
and we'll turn it over to council for
[4:03:36]
discussion.
[4:03:38]
>> Thank you, Zach. Um Elizabeth, why don't
[4:03:41]
you go first?
[4:03:42]
>> Okay. Have any questions?
[4:03:44]
>> No questions. Anybody have any
[4:03:45]
questions?
[4:03:45]
>> I'll just make comments. Um, let me get
[4:03:48]
public comment. Any public comment?
[4:03:51]
>> No public comment online.
[4:03:53]
>> Okay, great. So, now Elizabeth, why
[4:03:55]
don't you
[4:03:56]
>> So, I thought we should talk about this
[4:03:58]
because I thought it seemed kind of
[4:04:02]
insulting to members of the public, you
[4:04:04]
know, using words like please don't be
[4:04:06]
threatening and don't use profanity. And
[4:04:09]
I have to say there are certainly, you
[4:04:11]
know, and be respectful. I I think that
[4:04:14]
for the most part members of the public
[4:04:16]
who come to Ross Council meetings are
[4:04:18]
very respectful. I think there are times
[4:04:20]
when we as a council aren't respectful
[4:04:22]
and we should probably address that
[4:04:24]
amongst ourselves. But I don't think
[4:04:26]
that putting in, you know, a notice like
[4:04:29]
this into our um agendas
[4:04:33]
fixes that. And I think it it kind of
[4:04:35]
insults our members of the public
[4:04:37]
because they'll read it and they'll
[4:04:38]
think, "Oh, we we must be a bad group."
[4:04:41]
Um Belvadier as you mentioned um Zack
[4:04:43]
you know Belvadier Tibbrron and Cordera
[4:04:45]
Larks Sanble San Rafll none of those
[4:04:48]
towns have anything about respectful you
[4:04:51]
know anything like this it's Fairfax and
[4:04:53]
they're known to have kind of wild
[4:04:55]
meetings and then the county and I don't
[4:04:57]
really know about their meetings but I
[4:04:59]
don't I think it's not even I I think
[4:05:02]
it's not necessary and I think it's kind
[4:05:04]
of insulting. So that was why it kind of
[4:05:07]
feels like we don't trust our members of
[4:05:08]
the public. So I would just leave it
[4:05:11]
this very help these very helpful lines
[4:05:12]
about um how you you know when when uh
[4:05:18]
you can speak to an item you know it
[4:05:19]
mentions like you could that there will
[4:05:21]
be comment after uh after each item and
[4:05:23]
you get three minutes or something but
[4:05:25]
um yeah the mayor will invite public
[4:05:27]
comments following the staff
[4:05:28]
presentation uh I think that's very
[4:05:30]
helpful but I wouldn't put this in at
[4:05:33]
all and for those reasons
[4:05:36]
>> I I I feel very different I don't see it
[4:05:39]
is disrespectful. Um I I know it's uh
[4:05:42]
for a lot of commissions uh in the
[4:05:45]
county as well as for the board of
[4:05:46]
supervisors, this is in the agenda
[4:05:49]
always at the top and it really is it's
[4:05:53]
just a reminder. People most likely
[4:05:55]
don't read it after a while. It's a
[4:05:57]
reminder that when you're in a public
[4:05:59]
meeting to have respectful dialogue.
[4:06:04]
Well, maybe if if people think there
[4:06:06]
should be something, maybe it could be
[4:06:08]
paired down so that it's just the town
[4:06:10]
council and town of Ross encourage
[4:06:12]
respectful dialogue in comments at
[4:06:14]
council meetings and leave it at that
[4:06:15]
and not go into, you know, be civil, be
[4:06:19]
courteous, don't question the character,
[4:06:21]
don't use profanity, don't use abusive
[4:06:23]
language, don't threaten. I just feel
[4:06:24]
like really that's what we're telling
[4:06:27]
our town about. I mean, I don't feel
[4:06:28]
like we need it. So, I would do nothing
[4:06:31]
or I would make it you know you know
[4:06:36]
please be respectful
[4:06:39]
that would be my my position. I have a
[4:06:41]
suggestion since the two of you have
[4:06:44]
strong feelings about this and the two
[4:06:46]
of you are our procedures governance
[4:06:48]
gurus. Maybe the two of you can come up
[4:06:51]
with something that you both accept and
[4:06:55]
we can um discuss it.
[4:06:58]
>> Right now we we clearly have totally
[4:07:00]
opposite views.
[4:07:01]
Wouldn't it be helpful to hear the other
[4:07:04]
three of you
[4:07:06]
>> just I mean to direct us because you
[4:07:08]
know we're here and have we already know
[4:07:10]
what we each think and and why. So,
[4:07:14]
>> so my my opinion is um I think these
[4:07:17]
things got put on because of outbursts
[4:07:19]
like at the meetings where people, you
[4:07:22]
know, you had to they had to deal with
[4:07:24]
it. Like Fairfax and like like Elizabeth
[4:07:26]
said, I don't since I've been on the
[4:07:28]
council, I actually think it's been very
[4:07:30]
courteous and we haven't had outbursts.
[4:07:33]
We we did have that one guy member on
[4:07:35]
the call who was anti-Semitic, I
[4:07:37]
believe, and and we just shut it down
[4:07:38]
really quickly. So sometimes um
[4:07:43]
sometimes it's like like the the uh the
[4:07:47]
government that governs least is best.
[4:07:48]
You know, sometimes there's that
[4:07:50]
philosophy like are we searching for a
[4:07:51]
problem by putting it on? But but I
[4:07:54]
supported you in putting this here
[4:07:55]
because what I would say is I actually
[4:07:57]
agree with what was why don't we pair it
[4:07:59]
down a little bit. We could do that. you
[4:08:00]
know, like just just have the we we
[4:08:02]
encourage respectful dialogue and you
[4:08:04]
know what, if it gets bad and we really
[4:08:06]
have to sort of be more pedantic and say
[4:08:09]
like, you know, or prescri sorry,
[4:08:11]
prescriptive, yeah, no profanity and no
[4:08:13]
this and you'll have three minutes, you
[4:08:15]
know, because we have to we have a
[4:08:16]
problem. But just saying we support, I
[4:08:19]
actually think it'd be very elegant,
[4:08:20]
like a mission statement kind of because
[4:08:22]
actually it's so long. I actually don't
[4:08:24]
know if anyone's gonna read it, Terry,
[4:08:25]
because I I wanted people to read it and
[4:08:27]
actually be like, "Oh, you know, this
[4:08:28]
town respects respectful dialogue." I
[4:08:30]
like that. You know, something easy that
[4:08:32]
they'll just see every time. So,
[4:08:34]
>> I agree. I think we could pair it down.
[4:08:36]
U I I think it's important to have in
[4:08:39]
respectful dialogue because I think that
[4:08:42]
sort of fits into our tell goals. So,
[4:08:45]
yes, I'll do it. I'll work with
[4:08:47]
Elizabeth. Let's I'll take a draft. I'll
[4:08:49]
share it with you. You take a draft.
[4:08:51]
I'll share it with you.
[4:08:52]
>> Okay.
[4:08:53]
>> I agree. Just tone it down a bit. I I I
[4:08:55]
agree with it. Just
[4:08:57]
>> the first part of it is fine.
[4:08:59]
>> We really haven't had that kind of
[4:09:01]
problem. Thank goodness. And if we do,
[4:09:03]
we can be more specific. But, um, it's just nice. Like, we're all we're
[4:09:09]
all here to have a rational
[4:09:11]
conversation. Let's remember that to be
[4:09:14]
respectful. I'm I'm fine with that.
[4:09:16]
>> I think Bill, we've had some issues on
[4:09:19]
the council. We've had some
[4:09:20]
disrespectful issues on the council. Um,
[4:09:24]
and there have been a couple of meetings
[4:09:25]
where people have uh spoken, the public
[4:09:29]
has spoken and not always been
[4:09:31]
respectful. So, I think it's not that
[4:09:34]
we've never had any problems we have. I
[4:09:38]
think maybe they're in the past.
[4:09:42]
>> Let's hope they're in the past. and
[4:09:43]
we'll look forward to your revised yes
[4:09:45]
shorter language.
[4:09:48]
All right. Um, number 15.
[4:09:52]
>> Yes.
[4:10:06]
» With conclusions or come up with a
[4:10:08]
statement that they both agree on and
[4:10:09]
give it to the town manager. Yeah.
[4:10:11]
>> And not bring us back on the agenda. I
[4:10:12]
think that would be preferable. We trust
[4:10:14]
you to come up with something that's
[4:10:16]
great and so we don't have to discuss it
[4:10:18]
at the council again. Thank you, Ben.
[4:10:21]
>> Does everyone agree with that?
[4:10:23]
>> And if the council doesn't like it, it
[4:10:24]
can come back on the agenda.
[4:10:30]
» Number 15, no action items, council
[4:10:33]
correspondence.
[4:10:34]
Anything
[4:10:37]
future council items?
[4:10:43]
» I have a proposal
[4:10:46]
that we adopt a rule that's similar to
[4:10:48]
MCE's rule that we're going to adjourn
[4:10:51]
by 10:00 unless a majority of the
[4:10:53]
council agrees to go beyond 10:00.
[4:10:58]
We're not that far beyond 10:00, but I I
[4:11:01]
think we ought to have a goal. and out
[4:11:03]
of respect for the people who come
[4:11:05]
before us, but also out of respect for
[4:11:07]
ourselves.
[4:11:14]
We already have a rule on the books on
[4:11:15]
that, but it's a different hour. It's
[4:11:18]
midnight and we have to take a vote at
[4:11:20]
11. So, I think your proposal is to
[4:11:22]
bring it to 10:00 and, you know, take a
[4:11:27]
vote at 9:00. Would that be the
[4:11:29]
proposal?
[4:11:32]
Well, you know, the way it works at MCE
[4:11:34]
is the vote is there is either a vote at
[4:11:37]
10 o'clock or we're adjourned. And uh
[4:11:40]
the last time we simply adjourned it. We
[4:11:41]
didn't finish the
[4:11:43]
>> we didn't finish the calendar. Now, of
[4:11:44]
course, MC with 34 people, it can go
[4:11:47]
quite late, but still I I think we ought
[4:11:50]
to have a goal. Try to get out of here
[4:11:52]
at least by 10. And often we are, you
[4:11:55]
know, sometimes quite a bit earlier. I
[4:11:58]
mean, if there's a lot going on, we're
[4:11:59]
all going to vote to carry on another,
[4:12:01]
you know, I mean, it could be a
[4:12:04]
discussion and vote at 10. You know, I
[4:12:06]
don't think you can decide at 9ine if
[4:12:08]
you're going to close at 10:00. It's got
[4:12:10]
to be at the time if we do it at the
[4:12:14]
school had 11. Remember, we used to have
[4:12:16]
to take a vote at 11 if we wanted to go
[4:12:18]
past.
[4:12:18]
>> Yeah. and and council meetings that I
[4:12:21]
was attending in the you know mid2010s
[4:12:25]
they would go until or maybe it was 2008
[4:12:27]
they would go until 1:30 in the morning
[4:12:29]
>> that was before ADR so they did all
[4:12:31]
those planning projects at the meeting
[4:12:34]
>> y
[4:12:35]
>> well just I support bill I support in
[4:12:38]
bringing this forward and and and
[4:12:40]
discussing it and talking about a 10:00
[4:12:44]
uh meeting time and at that 10 o'clock
[4:12:46]
should we continue or should we Stop.
[4:12:48]
>> Is that
[4:12:49]
>> Yes, sir. Basically,
[4:12:50]
>> yes. I mean, if witnesses are here and
[4:12:52]
we're working on it.
[4:12:53]
>> Yeah, we would just continue.
[4:12:54]
>> We'll continue it.
[4:12:55]
>> So, he's saying move it to change the
[4:12:57]
rule to 10 and to um make the not nine
[4:13:00]
but at 10 discuss continuing or jouring,
[4:13:03]
>> right?
[4:13:03]
>> And so, we bring it back for discussion
[4:13:06]
or could we refer to the procedures
[4:13:08]
manual group or sorry to that government
[4:13:10]
committee? Either way, however you want
[4:13:12]
to handle it. Since you're meeting
[4:13:13]
anyway, you might as well do it. But but
[4:13:16]
it it I don't think let's just put it on
[4:13:18]
the calendar is my proposal.
[4:13:20]
>> Yeah, I think the agenda is better than um Terry and me because it's got to
[4:13:24]
be a consensus.
[4:13:27]
>> Okay. And see um the post office table.
[4:13:32]
The next meeting is Thursday, June 11th.
[4:13:35]
Does anyone want to do that?
[4:13:40]
» I could.
[4:13:41]
>> I'm sorry. Who could? Elizabeth.
[4:13:43]
>> I could.
[4:13:44]
>> Terry. Okay,
[4:13:46]
thank you.
[4:13:50]
So, it's Terry and Elizabeth. Is that
[4:13:52]
>> Sure.
[4:13:53]
>> Okay, great. Thank you. Meeting
[4:13:56]
evaluation
[4:13:58]
comments.
[4:14:00]
You know, I just have one suggestion,
[4:14:02]
Christa. You know, you said that was as
[4:14:04]
soon as you could get that information
[4:14:06]
out. And my suggestion would be um if
[4:14:10]
you know that there's going to be some
[4:14:12]
last minute stuff that you don't have
[4:14:14]
ready yet, just send it you know a few
[4:14:17]
days ahead say you know be expect new
[4:14:20]
information you know day of the meeting
[4:14:23]
so we'll know to look and leave time to re read it. That would have, you
[4:14:27]
know, just that was that one little
[4:14:28]
thing would have helped the meeting for
[4:14:29]
me. Just if id known that there was
[4:14:31]
something coming, I could have blocked
[4:14:32]
off the time. And it's okay if it's
[4:14:34]
late. If I if we knew or if I knew, then
[4:14:37]
I would have been in better shape to
[4:14:38]
read it.
[4:14:38]
>> Yeah.
[4:14:39]
>> I will um attempt to have my brilliant
[4:14:42]
ideas earlier than
[4:14:45]
9:00 a.m. on the morning of the agenda
[4:14:47]
meeting, which is when I had my
[4:14:48]
brilliant idea. So, but no, I I I hear
[4:14:52]
you and yeah, I will absolutely do my
[4:14:54]
best. the
[4:14:57]
I would like to note that the the
[4:14:59]
committee was not going to put anything
[4:15:01]
in your packet.
[4:15:04]
I I had to talk with them extensively so
[4:15:07]
that because I know that the council
[4:15:11]
it's beneficial for the council to have
[4:15:14]
information before the weekend um to be
[4:15:17]
able to start looking at it and thinking
[4:15:19]
about it and so thank you.
[4:15:23]
I just want to say to keep this meeting
[4:15:26]
going on even a little longer, I'm only
[4:15:28]
teasing, is that I thought that the flow
[4:15:30]
of the meeting went really well. I
[4:15:33]
thought the flow of the meeting went
[4:15:36]
really well today. I I thought um the
[4:15:40]
presentation was good, the questions
[4:15:42]
were thoughtful, the comments were good.
[4:15:45]
Um it felt like a very thoughtful
[4:15:48]
meeting. And Julie, you called breaks.
[4:15:51]
That which was really helpful. You
[4:15:53]
called breaks. We had a couple that that
[4:15:55]
really helped kind of focus people.
[4:15:57]
Otherwise, I think people just would
[4:15:59]
have been tired and wouldn't have been
[4:16:00]
as focused. That was really helpful.
[4:16:05]
>> I mean, my my comment is um I thought it
[4:16:08]
was really respectful and everyone went
[4:16:10]
through it. these the fire station is
[4:16:12]
the most controversial topic we deal
[4:16:14]
with and I thought everyone asked really
[4:16:16]
good questions and wanted answers and I thought it was handled really really
[4:16:20]
well and sometimes like this is what
[4:16:22]
progress looks like we are making
[4:16:24]
progress I know it doesn't feel that way
[4:16:26]
because we're always looking ahead and
[4:16:27]
the next battle but honestly the fact
[4:16:29]
that we all liked the concept and sort
[4:16:32]
of really this group coming together and
[4:16:34]
really doing a lot of hard work it's
[4:16:36]
progress and I just want to acknowledge
[4:16:39]
that because sometimes it doesn't feel
[4:16:40]
that way and we all sort of leave and
[4:16:42]
feel bad about something. I think we
[4:16:43]
should feel good that we've we've made
[4:16:45]
progress and I appreciated the
[4:16:47]
questions. I I thought everybody I know
[4:16:50]
I actually I look at Bill a lot and I
[4:16:52]
wonder he's like Natt stop talking stop
[4:16:55]
I see it in your face. Stop talking.
[4:16:56]
Stop asking questions.
[4:16:58]
>> Yeah. Yeah. But I I actually felt like
[4:17:01]
everyone didn't like dominate or ask too
[4:17:03]
many questions or I I thought everyone
[4:17:05]
was very fair in what they asked and
[4:17:06]
tried to move things along. And I
[4:17:09]
appreciate Ben you sort of saying like
[4:17:12]
let's not veer totally off on you know
[4:17:14]
on this issue of the ballot initiative
[4:17:18]
or we you know we always get into like
[4:17:20]
oh what may and um sometimes I think
[4:17:22]
it's really good to focus on what's
[4:17:24]
right in front of us right now. Let's
[4:17:26]
just try to solve that piece and we'll
[4:17:28]
deal with the next piece in the next
[4:17:30]
issue. The last thing I want to say is
[4:17:32]
we I think we all should be very open to
[4:17:34]
zooming for like a special meeting or
[4:17:36]
things as we start thinking through how
[4:17:38]
to process what's going to happen coming
[4:17:40]
up is these meetings end up being so
[4:17:43]
much because I think Chris is like you
[4:17:44]
only meet once a month and I've got to
[4:17:46]
get a lot covered. But if we're all
[4:17:48]
willing to say, hey, let's just zoom if
[4:17:50]
you need our guidance on something to
[4:17:52]
try to keep things moving quicker if
[4:17:55]
that's helpful. We can't you can't do
[4:17:57]
Zoom.
[4:18:00]
>> No.
[4:18:02]
or just but what I say is being open to
[4:18:04]
meeting more than um the once a month
[4:18:07]
sort of just to help process things
[4:18:09]
through. I'm totally willing to do it.
[4:18:11]
I'm just saying I I I want us to be able
[4:18:13]
to be responsive to the committee and to
[4:18:16]
Christa and try to process. So our
[4:18:18]
willingness to say, "Hey, we'll we'll be
[4:18:20]
there. We'll meet is very helpful." I
[4:18:23]
I'm totally committed to doing that
[4:18:24]
because I want us to move it this I
[4:18:26]
don't want us to be the roadblock. I
[4:18:28]
mean, if two can zoom in, that makes it
[4:18:30]
pretty easy for us as a group to have a
[4:18:32]
special meeting, you know, for
[4:18:34]
administrative things to approve, not if
[4:18:36]
we're trying to discuss something.
[4:18:39]
>> Yeah.
[4:18:40]
>> I'm sorry. You're talking about having a
[4:18:42]
special council meeting and have two
[4:18:43]
zoom in and the other three be here. Was
[4:18:45]
that what you just said?
[4:18:47]
>> If if there's something that needs to be
[4:18:48]
moved on quickly to approve something,
[4:18:54]
» yes, but you can't do that on a regular
[4:18:57]
basis. You can't you you have certain
[4:19:00]
reasons why you could participate
[4:19:02]
remotely. you
[4:19:07]
» you can only miss you can only do it for
[4:19:09]
certain reasons and
[4:19:12]
>> well no you can under the old Brown Act
[4:19:14]
rules which still apply if you publish
[4:19:15]
the agenda with their location and they
[4:19:17]
post the agenda at that location
[4:19:20]
>> you don't need to go for the just cause
[4:19:21]
reasons that the just cause kicks in
[4:19:24]
only if you want to do remote after the
[4:19:27]
uh agenda has been published so you
[4:19:29]
still can have two council members zoom
[4:19:32]
in if we know that ahead of time and we
[4:19:34]
publish the agenda with at their
[4:19:36]
locations.
[4:19:37]
>> And so could a council member do that
[4:19:39]
unlimitedly? So could a council member
[4:19:40]
do that all the time?
[4:19:42]
>> Yes, you can follow that process
[4:19:46]
that make their location part of the
[4:19:50]
public meeting and then the public would
[4:19:52]
be eligible to go to wherever that
[4:19:53]
address posted even if it's their homes.
[4:19:55]
>> Correct. You have to open up that
[4:19:57]
location to the public should the public
[4:19:59]
want to be there. because I've zoomed a
[4:20:01]
lot actually for for these meetings and
[4:20:03]
done that. I know you did one time. So,
[4:20:05]
I'm just saying because the summer
[4:20:06]
everyone's going to be traveling and I I
[4:20:08]
know how it is. So, I I just want and I
[4:20:10]
don't know if you guys will agree just
[4:20:12]
to be be available.
[4:20:15]
Yeah. So, let's all be open to that. And
[4:20:17]
Julie, you meet all the time and say
[4:20:19]
like let's call a special meeting to get
[4:20:22]
this processed.
[4:20:27]
Although I must say trying to set those
[4:20:30]
meetings sometimes can be tedious for
[4:20:32]
staff. So good luck.
[4:20:38]
» We done with any eval.