[0:06]
Good afternoon and welcome to this uh uh
[0:10]
transportation uh our coordinating
[0:12]
committee uh transcom. We're grateful to
[0:15]
have you here. I'm Commissioner Jim
[0:17]
Harvey from Weber County. Uh it's always
[0:19]
good to be here in person. This is one
[0:21]
of the uh most outstanding meetings of
[0:24]
the year and you'll find out later. This
[0:26]
is also I remember this nine 10 years
[0:29]
ago. My first meeting was I think uh
[0:32]
this meeting and so really good. I
[0:34]
appreciate all of you that are here. For
[0:37]
those of you in the room uh who haven't
[0:39]
yet found your seats, if you could find
[0:40]
your seats and and uh that'd be great.
[0:44]
We'll we'll get started. Uh we welcome
[0:46]
those of you who have uh made it in
[0:48]
person. Thank you for making that extra
[0:50]
effort. I'm sure it'll be worth it for
[0:52]
you today to be here. It's Tuesday,
[0:54]
April 30th. It's just after 1:30 p.m.
[0:57]
We'd like to excuse our chair, uh, uh,
[1:00]
Mayor Mark Shepard. He's not able to
[1:03]
join us today. Uh, but for those of you
[1:05]
who are here in person, there are, uh,
[1:09]
introductions that we're going to make
[1:11]
around the around the, uh, table here
[1:14]
today. And then Andrea, I'll ask you to
[1:16]
do the introductions online if you would
[1:19]
when we get to that point. Rosie, may we
[1:21]
start with you today?
[1:24]
>> Rosie Hernandez, and I'm part of the
[1:26]
admin team at WFRC.
[1:29]
>> Jordan Chandler, also part of the admin
[1:31]
team at WFRC.
[1:33]
>> Jerry Jackson, I'm the mayor of Mil
[1:34]
Creek.
[1:35]
>> Carlton Christensen,
[1:37]
board of trustees for the Utah Transit
[1:39]
Authority.
[1:41]
Brooke Duza. I'm an atlarge city council
[1:43]
member for Sandy.
[1:45]
>> Andrea Pearson, part of the WFRC admin
[1:48]
team.
[1:49]
>> Good afternoon. I'm Andrew Guber. I'm
[1:51]
executive director here at Wasach Front
[1:53]
Regional Council. And welcome
[1:55]
>> Wayne Ben, WFRC staff.
[2:00]
Bryce Bird with the Division of Air
[2:01]
Quality.
[2:05]
» Michelle Bedoso representing the
[2:07]
division of air quality board.
[2:10]
I'm David Brams, Immigration Canyon
[2:12]
Alternate.
[2:14]
>> Jordan Bachman with UD do
[2:17]
>> Alex Bame with UTA Planning and I'm
[2:19]
sitting in for Nicole Bordeaux who
[2:21]
couldn't be here today.
[2:27]
I'm Holly Pearson, director of planning
[2:29]
and transportation for Salt Lake County.
[2:34]
» Fibultani, WFRC staff.
[2:39]
>> Wagon, WFRC staff.
[2:42]
>> Ben Wri, WFRC staff.
[2:48]
» John A. Nardone, WFRC staff.
[2:53]
Good afternoon, Beth Hullbrook, UTA.
[2:59]
» Dan Doug, Salt Lake, City Council.
[3:01]
>> Great. Thank you, Andrea.
[3:04]
>> And those online, um,
[3:07]
Council, I'm going to read three and
[3:09]
then if you'll just, uh, introduce
[3:11]
yourself. Council member Eric Stroberg,
[3:13]
Mayor Chris K, and Mayor Lauren Palmer.
[3:22]
Hey, good afternoon everyone. This is
[3:23]
Eric Sherman with the Tula County
[3:25]
Council.
[3:28]
» Hey, good afternoon. Uh, Mayor Chris K
[3:30]
in Saratoga Springs, Utah.
[3:33]
>> Good afternoon, Mayor Palmer out in
[3:35]
Haramman.
[3:38]
» And, uh, Commissioner Railen Blocker,
[3:41]
Mayor Brandon, I'm sorry, Braden
[3:43]
Mitchell, and Mayor Paul Fatheringham.
[3:47]
That's Commissioner Blocker from Morgan
[3:49]
County.
[3:54]
» Uh, Mayor Braden Mitchell from Riverdale
[3:56]
City
[3:59]
>> and Paul Fatheringham. Uh, sorry I
[4:01]
couldn't be with you today, but I
[4:03]
brought a cold home from Texas last
[4:05]
night, so thought I'd stay away from
[4:07]
you.
[4:14]
Ted Nolton, uh, WFRC.
[4:18]
>> You know, Mr. Chair, I'll I'll note it's
[4:19]
fun to see people in the room and here
[4:21]
online. I've had the opportunity to
[4:23]
spend time over the last two weeks with
[4:24]
a bunch of folks here down in sunny St.
[4:27]
George. Many of you were there for the
[4:30]
league conference or for the UAC
[4:32]
conference. And it's nice to see you up
[4:34]
here. I'll just say Carlton was joking,
[4:36]
those of you that are in the room, it's
[4:38]
the what did you say? the uh parking
[4:40]
club of the month. Uh
[4:44]
>> you mean the fact that we've mastered
[4:46]
how to keep our car here without it
[4:47]
getting towed?
[4:48]
>> Yeah, it's um it's an aptitude test and
[4:50]
so far everybody in the room is passing
[4:52]
our parking system. So, well done.
[4:54]
>> I realize you change it every month to
[4:55]
keep us on our toes.
[4:56]
>> Not our doing, just for the record. Not
[4:58]
our doing, Mr. Chair.
[5:02]
>> Thank you so much, Andrew. Uh
[5:05]
we uh our last meeting of this body was
[5:08]
held on February 19th of 2026. Uh those
[5:12]
of you uh many of you on the line have
[5:15]
had a chance to review those minutes
[5:16]
that were taking taken at that time. Uh
[5:20]
I'm looking for a motion to approve
[5:21]
those minutes.
[5:25]
» Durk, great to have you here. Wow.
[5:27]
Wonderful.
[5:28]
>> Wonderful.
[5:29]
>> Thank you.
[5:31]
Becking if that's a legitimate motion.
[5:33]
>> That's a legitimate mo Durk. Give us
[5:35]
that. Andrea, you've got that down. We
[5:38]
got a motion in a second. Uh I'll
[5:41]
Carlton. Was this
[5:42]
>> No, I apologize. I'm I'm pointing at
[5:44]
Mayor Gail to join the table, please.
[5:48]
>> Perfect. Thank you. Thank you, Mayor
[5:50]
Gail. Looking. So, we'll now place that
[5:53]
for vote. All in favor say I.
[5:55]
>> Opposed, if any.
[5:57]
>> Great. That passes unanimously. Uh we'll
[6:00]
look now to turn the time over to Wayne
[6:02]
Benign for a few updates and reminders.
[6:04]
Wayne,
[6:07]
>> thanks Commissioner. Uh I want to share
[6:10]
a couple reminders but give some bigger
[6:13]
picture context at the same time. And so
[6:16]
uh you'll recall that two of the primary
[6:18]
products of the WFRC are the regional
[6:22]
transportation plan and the
[6:24]
transportation improvement program and
[6:27]
major roadway and transit and active
[6:29]
transportation product projects
[6:32]
um are identified by local governments
[6:36]
UD do and UTA and included in the RTP
[6:40]
once they're in the first phase or the
[6:42]
first 10 years of the RTP.
[6:45]
they can be included in the tip. Here's
[6:48]
the first reminder. Currently, the
[6:50]
preferred scenario of the RTP, the
[6:53]
regional transportation plan, uh is out
[6:57]
for public comment. Um that includes and
[7:02]
it's on the website on the WFRC website.
[7:05]
Uh so it includes all the needs that
[7:07]
have been collectively identified uh for
[7:11]
surface transportation out through 2055.
[7:15]
Uh if you haven't already, we'd
[7:17]
encourage you to comment on uh on the
[7:21]
website or contact a member of the long
[7:24]
range planning team. Uh comments comment
[7:28]
period is open through May 13th.
[7:32]
Uh like I just mentioned, when funding
[7:35]
is committed by UD do or UTA or a local
[7:39]
government to one of these major uh
[7:43]
roadway, transit or active
[7:45]
transportation projects in phase one of
[7:47]
the RTP,
[7:49]
it can then be included in the tip. Uh,
[7:53]
and as you're aware from the board
[7:56]
modifications that Ben presents every
[7:58]
month, uh, not only does the tip include
[8:02]
major projects like new road
[8:04]
construction or a new transit line, it
[8:07]
also includes numerous smaller projects
[8:11]
to address pavement safety and other
[8:14]
operational
[8:15]
uh, needs. Which brings me to the next
[8:19]
reminder I'd like to share. Uh on April
[8:23]
10th, we sent an email
[8:26]
uh in about the opportunity to apply for
[8:29]
funding through the safe streets and
[8:31]
roads for all SS4A uh federal funding
[8:36]
program. If you haven't done so
[8:38]
recently, would encourage you to take a
[8:41]
look at the comprehensive safety action
[8:43]
plan that's also on WFRC's website that
[8:46]
Transcom approved two years ago. see
[8:50]
what transportation safety needs are
[8:53]
identified in your community and
[8:55]
consider applying for funding. The
[8:58]
deadline for applications is May 26th
[9:01]
and a 20% local match is required. We'll
[9:04]
include a link again uh to that notice
[9:07]
of funding opportunity uh in the
[9:10]
follow-up email from this meeting.
[9:13]
Thank you.
[9:14]
>> That's a great report, Wayne. Thank you
[9:16]
so much. Before we move to public
[9:18]
comments, there are also two other uh
[9:20]
recent uh things that have just
[9:21]
happened. I'd like to turn just a couple
[9:23]
of moments over to Andrew Gruber to
[9:25]
explain those.
[9:26]
>> Thank you, Mr. Chair. I have uh two
[9:29]
items of very positive news to report.
[9:31]
You may be familiar with both of these
[9:34]
items. one is about the recent
[9:36]
preliminary EPA determination about uh
[9:40]
air quality and the second one is about
[9:44]
the uh opening the ribbon cutting for
[9:47]
the UTA bus rapid transit the Mid Valley
[9:50]
Express. So, uh, in that order, the
[9:53]
first item, and this is a rather
[9:54]
technical item, but the basic news is
[9:57]
that the EPA has made a preliminary
[10:01]
determination that uh, ozone causing
[10:06]
pollutants, emissions that literally
[10:10]
blow in from outside of Utah, from
[10:13]
China, from California, otherwise that
[10:16]
are outside of the control of Utons will
[10:20]
not be counted as we are determining how
[10:25]
as we are being measured for the ozone
[10:28]
concentrations in our atmosphere. Um
[10:32]
this has been this is something that
[10:33]
we've been working on. When I say we I
[10:35]
mean WFRC U DOT uh particularly with the
[10:39]
great experts at uh Utah DEEQ and DAQ
[10:43]
and I'm going to put Bryce on the spot
[10:45]
here in just a moment ask him if he
[10:46]
wants to comment. We've been working on
[10:48]
this for a while because if um if we had
[10:52]
to be sort of held accountable, if you
[10:55]
will, for emissions that are coming from
[10:57]
uh overseas or from out of our control,
[11:00]
it would be very hard for us to be in
[11:04]
conformity with the applicable uh ozone
[11:07]
requirements. Um, now I should note at
[11:11]
the same time that I say that
[11:13]
collectively we have been working and
[11:15]
will continue to work incredibly hard on
[11:19]
reducing emissions in our atmosphere
[11:21]
because that matters to our health. Um,
[11:25]
and in fact the the mobile sources,
[11:28]
cars, trucks, buses, etc. That's really
[11:30]
what we talk about most here. The
[11:33]
emissions have been declining
[11:35]
dramatically as vehicles have gotten
[11:37]
cleaner, as we continue to provide more
[11:39]
and more options for people to take
[11:42]
transit or to bike or to walk. This is
[11:44]
our transportation system, our community
[11:46]
design. All of these things fit
[11:49]
together. So, we'll keep making progress
[11:51]
on air quality. But from a regulatory
[11:53]
perspective, this is a very positive
[11:55]
development. The last thing I'll say is
[11:58]
that if we were not able to uh and this
[12:02]
is where I always get in trouble because
[12:04]
it's like what are the exact right words
[12:06]
to use? Bryce will correct me. If we're
[12:08]
not able to attain the standards,
[12:11]
demonstrate conformity both
[12:14]
with the applicable ozone requirements,
[12:17]
there could be a restriction on how we
[12:21]
use and uh transportation dollars, what
[12:23]
transportation projects we invest in,
[12:25]
including potentially transit projects.
[12:27]
In other words, we might have
[12:29]
restrictions imposed on our ability to
[12:31]
do transit expansions, even though, as
[12:34]
we know, that's helpful to air quality.
[12:36]
So that wouldn't make much sense. So
[12:38]
that's a positive development. Um Bryce,
[12:42]
do you want to comment and or clean up
[12:43]
anything that I just said?
[12:45]
>> No, that's great. I think one thing
[12:47]
we've been emphasizing of course is
[12:48]
we're we're not yet uh out of the woods
[12:51]
and really emphasize that. So, uh, by
[12:54]
EPA reconsidering their their change in
[12:56]
classification from moderate to serious,
[12:59]
it does relieve us of some f future
[13:01]
obligations like an enhanced emissions
[13:03]
testing program, which would basically
[13:05]
require roadside testing of our our
[13:07]
vehicles to make sure that what we
[13:08]
assume in our models is correct on the
[13:10]
transportation side. um but also a
[13:13]
requirement for uh kind of additional uh
[13:16]
really hard reductions for us in
[13:18]
particular because we just went through
[13:19]
the Sirius PM 2.5 state implementation
[13:22]
plan which we got the good news in
[13:24]
December that EPA accepted the plan and
[13:26]
we've been reclassified to attainment
[13:28]
for that that standard but we said made
[13:30]
such great work on that and had so many
[13:34]
reductions there that it's hard to find
[13:36]
additional reductions now under the
[13:37]
ozone planning requirement. So, this uh
[13:39]
helps us uh kind of buy us some time,
[13:41]
helps us focus on local emission
[13:43]
sources. Uh we're still in
[13:44]
non-attainment, but we still and we
[13:46]
still have to make reasonable progress
[13:48]
over time, but it does kind of help us
[13:51]
from the next hammers that we were
[13:53]
expecting from that as well. If I could
[13:55]
mention, there's also a second action
[13:57]
that we have before EPA right now to to
[13:59]
have them accept our state
[14:01]
implementation plan for the moderate
[14:03]
level of attainment that we submitted in
[14:05]
December of 2024.
[14:07]
And uh if EPA accepts that plan, that's
[14:09]
what gets us out of the risk of a uh the
[14:13]
sanction clock starting. Uh so that
[14:15]
would freeze transportation planning at
[14:17]
that point if if that if they were to
[14:18]
take that action and then the sanctions
[14:20]
come in uh two years after the the
[14:22]
freeze. And so it's very important that
[14:24]
we're still working on on that effort.
[14:26]
And uh there's a lot of folks that are
[14:28]
um very actively lobbying EPA to to make
[14:33]
a decision on that front as well. Uh
[14:36]
actually since it has been 18 months now
[14:38]
uh they really need to act by next
[14:40]
month. So
[14:42]
>> Bryce, thank you. This is a a a
[14:44]
complicated area from a scientific
[14:45]
perspective, from a regulatory
[14:47]
perspective. We're all working really
[14:49]
hard on it to continue to be able to do
[14:51]
good planning and good investment in
[14:52]
transportation and say increase mobility
[14:56]
to have a strong economy and to have uh
[14:59]
cleaner air. These things are not
[15:01]
mutually exclusive and so we're working
[15:02]
on all of them. Colon,
[15:04]
>> I was just curious, roadside testing,
[15:07]
what does that mean? And also, what are
[15:10]
some maybe examples of things that you'd
[15:13]
have to try to do that now goes kind of
[15:16]
beyond the current PM2
[15:19]
requirements?
[15:20]
>> Yeah, just quickly, it's mostly a a an
[15:23]
US problem. Um and basically it is that
[15:26]
so we have the emissions testing program
[15:27]
now where uh after the first few years
[15:30]
of a vehicle's ownership it requires
[15:32]
annual testing to make sure that uh the
[15:34]
vehicle is still operating as the
[15:36]
manufacturer designed it to operate. Um
[15:39]
the the
[15:40]
big uh leap with the with enhanced
[15:43]
emissions testing is again you have to
[15:44]
verify that your assumptions that you
[15:46]
use in your transportation planning are
[15:48]
accurate based on uh actual tests uh on
[15:52]
the road. So basically uh at uh freeway
[15:56]
entrances or roads around the valley, we
[15:58]
have to create a plan to to again
[16:00]
demonstrate that the vehicles are
[16:02]
actually in use meeting what the uh
[16:05]
testing or the the check engine light is
[16:06]
showing that they're supposed to meet.
[16:08]
So it's a big lift. Uh again, a lot of
[16:10]
more staffing for us, a lot of more
[16:12]
demonstration for us, uh some expensive
[16:14]
equipment to purchase and uh distribute
[16:16]
throughout the valley, but that's the big lift for us. And it basically is
[16:20]
verifying that the assumptions that we
[16:22]
make based on uh the fleet both that are
[16:25]
subject to emissions testing because
[16:26]
they're registered in these counties and
[16:28]
all the vehicles that are coming in from
[16:30]
other areas that don't require testing
[16:32]
and be able to get a more accurate
[16:34]
number as to the actual transportation
[16:36]
emissions on the road versus relying
[16:39]
only on the model.
[16:42]
And if anybody wants to go deeper uh
[16:45]
into this issue, we can go really really
[16:47]
deep in this issue. So, just let us know
[16:49]
if you have any questions and we're
[16:51]
happy to talk offline about this. And if
[16:53]
you ask us anything that we can't
[16:54]
answer, Bryce and Michelle can answer
[16:56]
those questions. Thank you. Okay, the
[16:58]
next thing, um, you probably all heard
[17:01]
this, but the ribbon cutting was earlier
[17:04]
this week for the UTA's bus rapid
[17:07]
transit system, the Mid Valley Express.
[17:09]
This is really exciting. This project
[17:12]
has been in the plans for over 20 years
[17:15]
and through perseverance and
[17:17]
collaboration it is now operating. This
[17:19]
is the BRT system that connects Murray,
[17:22]
Taylorville, and West Valley City. Um
[17:25]
the ribbon cutting was just earlier this
[17:27]
week. Carlton is the chair of the board.
[17:30]
You you might want to make a comment
[17:31]
here. Carlton was there speaking. I know
[17:33]
Beth was at the event. Holly uh spoke at
[17:35]
the event and gave great comments also
[17:36]
on behalf of Mayor Wilson. Um it's just
[17:39]
an exciting progress. Carlton, brief
[17:42]
comment.
[17:42]
>> Yeah. Uh we're uh super excited. The
[17:45]
system uh we completed a year ahead of
[17:49]
schedule u thanks to some great timing
[17:51]
and and our contractor's availability
[17:54]
and thanks to the commitment of WFRC and
[17:58]
really the local officials that make up
[18:00]
that uh the first three years similar to
[18:03]
some of our other bus rapid transit
[18:06]
system will be free zero fair I should
[18:09]
say. And um this is an all-electric bus
[18:13]
uh system and it it also links the last
[18:16]
u major um institution of higher
[18:19]
education into our system. We didn't we
[18:22]
had buses that served the slick campus
[18:24]
but nothing with the kind of frequent
[18:27]
connection service and it also helps
[18:29]
connect a lot of the west side of the
[18:31]
Salt Lake County into our front runner
[18:34]
system more easily. So, I think it'll be
[18:37]
a great system and my guess is it'll
[18:39]
outpace the writership estimates
[18:42]
>> and as Carlton said, WFRC was really
[18:45]
happy to be able to help in the planning
[18:46]
with this. Alex knows this. The planning
[18:48]
UD do's involved in this. A lot of the
[18:51]
BRT runs on UD dot roadway with the
[18:54]
cities. I mean, just so much partnership
[18:55]
and this body authorized some funding
[18:58]
going to that project uh over time. So,
[19:01]
it takes partnership. So, okay. Thank
[19:03]
you, Mr. Chair.
[19:04]
>> Thank you. So, thank you so much. Just
[19:06]
to comment on that most recent one, you
[19:08]
I think you will find that your usership
[19:10]
with our Ogden or OGX line which is now
[19:14]
more than three years old. We've tripled
[19:17]
the estimate numbers. Our wrership has
[19:19]
tripled what they anticipated using at
[19:22]
that time and it does tie into that
[19:23]
front runner. It's been a really good
[19:25]
thing. I'll also just say for those in
[19:27]
the room and those online since um
[19:30]
Railen Blocker and I are the only two
[19:32]
county folks that have the voice voice
[19:34]
here for you folks in the city and the
[19:36]
others just remember this as it comes to
[19:38]
ozone Bryce and Michelle it's what we
[19:41]
say in the counties it's pretty simple
[19:45]
you graze it you log it or the good Lord
[19:48]
will burn it so that stuff coming in
[19:51]
from Northern California and across the
[19:54]
pond to China. It it it matters a lot.
[19:57]
But I'm really grateful. I I've uh I'm
[19:59]
since your first presentation, uh Bryce,
[20:02]
a couple three years ago, I've moved my
[20:04]
two-stroke weed eater because you told
[20:06]
me about that to an electric weed eater.
[20:09]
And boy, that's been a peach. It's
[20:11]
barely been a good thing. So, there you
[20:13]
go. You made a believer out of me.
[20:16]
>> Mr. Chair, if I could just add one
[20:18]
thing. Uh we actually have an incentive
[20:19]
program right now. So, if uh anyone is
[20:22]
wanting to to take that leap into an
[20:23]
electric uh either uh string trimmer,
[20:28]
leaf blower, uh our our current uh air
[20:30]
quality incent program, you just search
[20:31]
at air quality incentives.utah.gov
[20:34]
or charge your yard uh.utah.gov.
[20:38]
Uh you can see those. And so we've been
[20:40]
doing a lot of uh public or social media
[20:42]
advertisings advertisements in all the
[20:45]
counties that are uh that that's
[20:46]
available for. So encourage your your uh
[20:49]
citizens to to participate in that
[20:51]
program as well.
[20:52]
>> Well, I you know I I worried about them
[20:54]
not having the power, but coming from a
[20:56]
two-stroke, I think there's nothing that
[20:58]
could have that much torque. And mine's
[21:00]
actually twisted the shaft. There's so
[21:02]
much torque. There's it's a lot of
[21:04]
power. We love it. All right, we're
[21:05]
looking now for public comments. Those
[21:07]
of you in the public in the room, if you
[21:09]
have any public uh comment, we'd limit
[21:12]
your comments to three minutes. those
[21:14]
items that are uh please address those
[21:16]
items only on the agenda.
[21:19]
Hearing none, we're going to move on to
[21:21]
item number four now.
[21:22]
>> See if there's anybody online.
[21:24]
>> Anybody online? Andrea,
[21:26]
>> there are no public commenters online.
[21:28]
>> Thank you. No public online or There we
[21:30]
go. So, we're going to move to item
[21:32]
four. Uh Ben, if you'll get set up, this
[21:34]
is you. Now, there there's six parts to
[21:36]
item number four. A B CDE E and F. And
[21:39]
so we're going to turn the time over to
[21:41]
Ben Witch to to first off today the uh
[21:45]
it's regarding the transportation
[21:47]
improvement program or the TIP. Um
[21:52]
the the last four are Transcom's annual
[21:55]
opportunities to review the the
[21:57]
recommended projects and to add fun
[21:59]
federal funding programs administered by
[22:01]
the WFRC regional council. Ben, go
[22:04]
ahead.
[22:06]
>> Wonderful. Emma does. Uh so Mr. Chair,
[22:10]
you you introduced me well there. So a
[22:13]
lot of us we had the opportunity today
[22:15]
to talk about the transportation
[22:16]
improvement program or the big picture
[22:19]
is the tip and right now and currently
[22:21]
we're functioning under the 2026 2031
[22:26]
transportation improvement program but
[22:29]
we'll be talking here in a few minutes
[22:30]
on the preparations to move forward with
[22:32]
the 2027
[22:34]
2032 tip. So, a little bit about today's
[22:38]
meeting. Then, just to give us a a
[22:41]
highlight there, we have a report on the
[22:43]
board modification of the action that
[22:46]
was taken by the regional council back
[22:47]
in March. Then, we have a new board
[22:50]
modification to bring before you today.
[22:52]
And then, as the chair indicated, we've
[22:55]
got to talk about the draft projects to
[22:58]
move into the draft programs for the
[23:01]
2027 2032 tip.
[23:04]
So, the first there being um an
[23:08]
understanding or acknowledgement of what
[23:10]
the transportation improvement program
[23:12]
does. It's a six-year program of funded
[23:16]
highway transit and active
[23:18]
transportation projects. It's not
[23:20]
another planning document. This is the
[23:23]
funded projects that are moving forward.
[23:25]
It implements the capacity projects in
[23:28]
the long range plan. as Wayne indicated
[23:31]
earlier, those that are in the phase one
[23:33]
of the long range plan. And then it also
[23:35]
helps us meet the short range needs
[23:38]
along the Wasatch front. And then
[23:40]
because the dynamic nature of the
[23:42]
projects, the timing, the funding, um we
[23:45]
have periodic modifications about every
[23:47]
time we meet, we have a board
[23:49]
modification for the transportation
[23:51]
improvement program. So the board
[23:55]
modification that that took place with
[23:57]
the regional council was back in March.
[23:59]
And in your meeting materials, you
[24:01]
should have a copy of the table. That
[24:03]
table identifies those projects that
[24:06]
they reviewed and approved as a board
[24:08]
modification. And there's a copy of that
[24:10]
signed resolution. This is an
[24:12]
information item. Are there any
[24:14]
questions with this?
[24:19]
Wonderful. Mr. Chair, we good to keep
[24:21]
going?
[24:23]
If there are no questions, just please
[24:25]
keep going. Thank you.
[24:26]
>> Now, now with just the modifications.
[24:28]
Thanks.
[24:29]
>> So, we have a board modification to
[24:32]
bring before you today. And in your
[24:34]
meeting materials, you'll also find a
[24:36]
table. That table identifies the
[24:38]
project. We have one project today
[24:41]
before you to be modified into the
[24:43]
transportation improvement program. This
[24:45]
particular project is located up in
[24:48]
Boxelder County. This is in the city of
[24:51]
Willard and it's on 750 North at the
[24:54]
intersection there of 200 West. This
[24:57]
project is to address pedestrian and
[25:00]
cyclists that would be crossing 750
[25:03]
North here at 200 West as the trail
[25:06]
facility is improved. Now, the intent of
[25:10]
this project is to include the
[25:12]
construction or the the installation of
[25:16]
an RRFB,
[25:18]
which is a a rectangular rapid flashing
[25:20]
beacon. Cool acronym to utilize when
[25:24]
you're in conversation with your
[25:25]
friends.
[25:27]
Do you know about the RRFBS? Anyway, or
[25:31]
it could be implemented here where you
[25:34]
have uh a pedestrian hybrid beacon which
[25:37]
is actually more like a hawk signal that
[25:40]
goes across the full facility. Now, back
[25:43]
when this project was initially put on
[25:46]
the tip, it was about back in 2014,
[25:49]
it was identified that uh there wasn't a
[25:52]
lot of activity in that area. And this
[25:55]
particular project didn't warrant the
[25:57]
ability to put a flashing sign or
[26:02]
something there to indicate the traffic
[26:04]
that there might be pedestrians.
[26:06]
However, since that time, there has been
[26:08]
an increase of use, but unfortunately,
[26:11]
there's also been an increase of project
[26:13]
cost. So, the intent of this board
[26:15]
modification is to request that we add
[26:18]
an additional 150,000 to this project of
[26:21]
CMAC funds. These are the Ogden Lanton
[26:24]
congestion mitigation air quality funds.
[26:27]
and then the local match of just under
[26:29]
11,000 bringing us total project value
[26:33]
to 252,000
[26:35]
plus. So, Mr. Chair, that's the board
[26:37]
modification before us. Thank you so
[26:40]
much. Are there any questions or
[26:41]
comments before I entertain a motion?
[26:44]
Hearing none, I'm looking for a motion
[26:46]
to approve the resolution to modify the
[26:48]
2026 to 2031 transportation improvement program as requested.
[26:56]
» Mr. Mr. Chair, I move approval of the
[26:58]
resolution.
[26:59]
>> Thank you, Carlton. And a second by Dan.
[27:02]
Thank you so much. If there's no other
[27:04]
questions, I'll place that motion for
[27:06]
vote. All in favor?
[27:08]
>> Opposed, if any.
[27:11]
>> Great. That's passes by unanimous. Thank
[27:13]
you. We'll move on to now item 4 C. Ben,
[27:16]
this is a recommend. This is to
[27:18]
recommend the 2027 through 2032
[27:21]
congestion mitigation air quality
[27:23]
program or the CMAC
[27:26]
and item 4D which will be action uh to
[27:29]
commend the 20 to recommend the 2028
[27:31]
carbon reduction program or the CRP. Mr.
[27:35]
Wrich, go ahead please.
[27:36]
>> Thank you, Mr. Chair. So, if I was a
[27:40]
drum player, we'd have a little drum
[27:41]
roll here or maybe we'd have just a
[27:43]
there. That's amazing. Thank you. So,
[27:47]
um, the chair pointed out there are
[27:49]
programs and we're going to identify,
[27:51]
um, we're going to focus on the first
[27:54]
two, but I just want to give these guys
[27:56]
each an opportunity to introduce
[27:57]
themselves. There say step forward and
[28:00]
wave to you. So, these four projects are
[28:03]
the capital funds or our funds for the
[28:07]
capital projects in a while front. These
[28:10]
are the programs that your key
[28:12]
responsibility is to recommend the
[28:16]
projects that'll move forward in these
[28:18]
programs. So today we're going to
[28:20]
present these projects to you for your
[28:22]
approval and recommendation to the
[28:24]
regional council that they be included
[28:27]
in the draft programs. So where did that
[28:31]
all start? Well, you you may recall that
[28:34]
last August when we went to the regional
[28:36]
council, we received direction from them
[28:40]
to solicit the new project process that
[28:43]
initiates in September. So, in
[28:46]
September, we sent out a request for
[28:48]
letters of intent. That's an intent to
[28:50]
submit a concept report or an
[28:51]
application. Then those were due back to
[28:55]
us in the middle part of October. And we
[28:58]
requested from those projects that were
[29:00]
eligible. We had a very high level
[29:03]
review of the projects, identified uh
[29:06]
eligibility as well as conversation on
[29:09]
where the the project may stand the best
[29:12]
chance to compete for resources or where
[29:15]
they could go for resources, but that we
[29:18]
requested the potential project sponsors
[29:20]
prepare a project evaluation concept
[29:23]
report or an application. and they
[29:26]
prepared that and that was due back to
[29:27]
us in the early part of December. From
[29:30]
that point through the months of
[29:33]
January, February, March, we were
[29:36]
involved in project evaluation. That
[29:38]
included conversations with the
[29:41]
potential project sponsor. That included
[29:43]
field reviews where we were out on site
[29:46]
looking at the projects. That included
[29:48]
evaluating all of the data and
[29:50]
information that we solicited and got
[29:52]
back in their applications.
[29:55]
Then we from this point forward we bring
[29:59]
that information to transcom for
[30:01]
transcom's review and we'll dive into
[30:04]
that in just a minute and then their
[30:06]
recommendation to the regional council
[30:08]
and we'll take that information to them
[30:10]
in their May meeting. After that we
[30:13]
prepare the draft tip to go out for
[30:14]
public review and comment which we will
[30:17]
be directed by transcom in June that
[30:20]
takes place during the month of July.
[30:23]
After July, we bring that information
[30:25]
back to all of our committees and we go
[30:28]
through and share with them the
[30:30]
information we received and then receive
[30:33]
direction from Transcom and then into
[30:35]
the regional council for approval of the
[30:38]
27 2032 tip. That information is then
[30:42]
compiled with UD do and the other three
[30:45]
NPOS's in the state and is submitted to
[30:48]
Federal Highways FHWA and Federal
[30:51]
Transit Agency FTA for their review and
[30:54]
their approval come October 1
[30:57]
is when our 2027 2032 tip becomes a real
[31:02]
live document. That's where we're moving
[31:05]
forward. But incidentally, back in
[31:07]
September, we'll begin the process for
[31:08]
the 2023 2028 process. But today, here's
[31:13]
where we are. We're bringing this
[31:15]
information to you of the draft
[31:17]
projects. Now, where did we go or how
[31:19]
did we get here? Well, when we solicited
[31:23]
those projects and we received the
[31:24]
concept reports in the Ogden area, Ogden
[31:27]
Leighton area, which goes from
[31:29]
essentially Bigham City all the way down
[31:32]
to Utah County
[31:34]
and is um west of the the Wasatch Front.
[31:39]
We received 28 projects to evaluate. 28,
[31:44]
but there's 24 unique project. That
[31:46]
means there's four projects that also
[31:49]
asked out of other funding sources. So,
[31:52]
we got 24 projects that we're going to
[31:54]
focus on and they totaled more than $177
[31:59]
million
[32:00]
for total project costs. They requested
[32:04]
a little more than $111 million to
[32:07]
construct or to implement these
[32:10]
projects. and we had available in the
[32:12]
Ogden Lake and urban area to program 25
[32:15]
a.5 million.
[32:17]
So a significant need on great projects,
[32:21]
but it really narrows that
[32:22]
responsibility down to identify what's
[32:25]
going to make the best project for the
[32:28]
funds that are available. So in the Salt
[32:30]
Lake area and can I just let me just go
[32:33]
back for one slide? Let me just jump in
[32:34]
just for one point of clarification. So
[32:37]
what you're showing on the screen right
[32:38]
now are the project requests that came
[32:42]
in from a particular a portion of our
[32:45]
region. Right. Correct.
[32:46]
>> Southern Boxelder County, Weber County,
[32:49]
Davis County.
[32:50]
>> Yes.
[32:50]
>> And um we handle that area with with uh
[32:54]
in one uh segment. And then we have Salt
[32:58]
Lake County in another segment. You're
[33:00]
about to go to that. And then Morgan and
[33:04]
Tilla counties. We work with them. But
[33:06]
this project funding of projects through
[33:09]
these funds actually goes through UD do
[33:13]
not through WFRC and we work with the
[33:18]
rural planning organizations in Morgan
[33:19]
and Tuella. We staff them to help them
[33:22]
do their processes in Morgan and Tuella.
[33:24]
So I just wanted to make sure that it's
[33:25]
clear what the areas are that Ben is
[33:29]
talking about uh with all of these
[33:32]
project requests that are coming in. And
[33:34]
Ben, just to emphasize what you said,
[33:36]
the blue line is how much money is
[33:38]
requested and the red line is bar is how
[33:41]
much money we have available. So the
[33:42]
need is so much greater than the uh the
[33:44]
funds we have available. Thanks, Ben.
[33:47]
Thank you, Andrew.
[33:49]
If I may, I'll just note that the joint
[33:52]
highway committee, the statewide joint
[33:54]
highway committee uh made
[33:56]
recommendations
[33:58]
uh just a week ago in regard to funding
[34:02]
of projects uh outside of the Wasatch
[34:06]
Front area and uh those recommendations
[34:10]
will be taken to the state
[34:11]
transportation commission uh later in
[34:14]
May or June. So,
[34:17]
>> perfect. Thank you, Wayne. Thank you.
[34:20]
So, as Andrew indicated, um, and we'll highlight just her or talk a
[34:26]
little more. And so, in the Salt Lake
[34:28]
area, there were 77 total projects to
[34:31]
request, 56 of those projects are
[34:34]
unique. So of those unique projects,
[34:36]
they totaled more than 621 million
[34:40]
requesting more than 235 million and we
[34:44]
had available just under 40 million to
[34:47]
program. So like on the the Ogden
[34:50]
Leighton urban area, you can see that
[34:52]
there were 28 projects that were
[34:54]
requesting STP funds, surface
[34:56]
transportation program funds. There were
[34:59]
16 that were asking for CMAC funds.
[35:02]
There were 19 that were asking for TIP
[35:04]
funds and there were 14 that were asking
[35:07]
for carbon reduction program funds or
[35:10]
CRP funds. So if you add those blue
[35:12]
lines up, that's your 77. But there's
[35:15]
some of those that are carried over. The
[35:17]
part we want to point out though is the
[35:20]
total and requested is not a
[35:23]
duplication.
[35:25]
that's unique to those unique projects
[35:28]
or those numbers are are associated with
[35:31]
unique projects. Yes.
[35:33]
>> Are you saying that if you apply under
[35:35]
one category, you cannot use that same
[35:37]
application for another category?
[35:40]
>> Um,
[35:42]
no. But they can be considered in both.
[35:44]
And and you will see here shortly,
[35:47]
mayor, that there are projects that are
[35:48]
funded in both categories to help us
[35:52]
meet that project request or to program
[35:55]
funds towards. It may not be the total
[35:57]
amount being requested, but they may be
[36:00]
funded out of.
[36:01]
>> So it could be partial in one and
[36:03]
partial in another one to make to go
[36:05]
together because they fit.
[36:06]
>> Boy, you're headed right down the road.
[36:09]
We want you to. to just hold that
[36:10]
question for just a little bit longer.
[36:14]
>> Perfect. Perfect. Thank you. So, um, to
[36:18]
get these projects, then here's the
[36:20]
information that we we solicit with the
[36:23]
potential project sponsors. So, these
[36:26]
right here, these forms, that's the cost
[36:28]
estimation forms. Every project sponsor
[36:31]
fills out those forms, gives us the
[36:34]
exact same information for every
[36:36]
project. Right? Then these forms right
[36:39]
here, these forms are for the STP, the
[36:42]
CMAC and the CRP programs so that we can
[36:46]
ask and get back data, the same kind of
[36:50]
data from those projects. The next ones
[36:53]
there in the yellow, the four sheets,
[36:54]
those are for the TAP programs. And in
[36:58]
the CMAC and the CRP where they deal
[37:01]
with air quality benefits, they also
[37:04]
have to submit an emission analysis
[37:06]
form. So from all of this information,
[37:09]
we're collecting a lot of data. A lot of
[37:11]
data that we can measure, a lot of data
[37:13]
we can do calculations from. We also
[37:17]
have information that we collect when we
[37:19]
go out for a field review. We validate
[37:21]
information we've collected or the data,
[37:24]
but we also collect additional
[37:26]
information that we can see on site that
[37:28]
maybe you can't measure. And so we got a
[37:34]
source here of data or distribution of
[37:37]
projects. We have these numbers can help
[37:40]
us generate a score.
[37:43]
That score will may include information
[37:46]
on congestion or access, pavement
[37:49]
condition or safety improvements,
[37:52]
emission, air quality, project cost,
[37:55]
etc. That category with criteria goes
[37:58]
on. But we call this the data. This is
[38:01]
stuff that can be quantified, can be
[38:04]
measured. But we also because many of
[38:07]
you know to identify a good project
[38:09]
sometimes you just can't measure
[38:11]
everything about a project. So we
[38:14]
consider other relevant professional
[38:16]
considerations.
[38:18]
Some of these are on a field review.
[38:19]
We'll talk maybe briefly about some of
[38:21]
those examples. The sponsor's project
[38:24]
history. We don't want to throw any
[38:26]
project sponsor under the bus, but it's
[38:29]
important that we've got didn't mean
[38:31]
that to bad towards UTA either.
[38:34]
>> I was going to say we have a very good
[38:36]
safety record. Oh,
[38:37]
>> so few people end up under the
[38:40]
>> good. We won't don't want to throw them
[38:42]
under a green bike or something, but but
[38:46]
uh the longer we wait on a project, the
[38:49]
more it cost and the less our dollar can
[38:52]
afford. And so we want those projects
[38:54]
happening as quick as they can happen.
[38:57]
Distribution of funding across the area.
[38:59]
Maybe some area is really heavy on
[39:01]
funds, project synergy, what's happening
[39:03]
with this project as this one moves
[39:05]
forward. And we you see the others that
[39:08]
are there. And so these are other
[39:10]
considerations that are being included
[39:12]
when we go. So we we gather all of this
[39:15]
information from the field review from
[39:17]
the data that is collected on the
[39:20]
concept reports and then we look at all
[39:23]
this other information and that's where
[39:25]
we prepare recommendations or come
[39:27]
forward with the project. So maybe if
[39:31]
it's all right I actually I found this
[39:33]
really cool definition
[39:36]
that I kind of tweaked to address but it
[39:38]
says this. that says quantify and
[39:41]
qualify represent different approaches
[39:44]
to information. There's part I added to
[39:47]
identify the project with the most
[39:49]
benefit at this time. Quantify measures
[39:52]
with numbers, how much, how many,
[39:55]
focusing on precision statist
[39:58]
statistical data. Qualify describes
[40:01]
characteristics, nuances, and context.
[40:04]
What kind or why? And so using
[40:06]
descriptive descriptive language,
[40:09]
quantifying counts, qualifying defines.
[40:13]
And so these are some of the tools that
[40:15]
we're utilizing to identify the best
[40:17]
project. But if it's all right with you,
[40:20]
let's walk through an object lesson here
[40:23]
to illustrate what we're talking about.
[40:28]
Brace yourselves.
[40:34]
So, I want to introduce I want to
[40:37]
introduce project A and project B.
[40:41]
So, we're going to put project
[40:44]
I'm not nervous.
[40:46]
Let's put project A over here.
[40:50]
Maybe we'll
[40:52]
put project B over here.
[40:56]
Holy cow.
[40:58]
>> Ben, are you saying that we don't with
[41:01]
all the even with the 50 or so million
[41:05]
dollars a year that we have available to
[41:07]
put to projects, we can't fund all of
[41:10]
them? So, somehow we have to make
[41:12]
decisions about which projects. Is that
[41:14]
what you're saying?
[41:15]
>> Yes. Thank you, Andrew.
[41:17]
>> Yeah. And you know, it it's a tough job.
[41:20]
It's it's really tough and you know we rely heavily on our technical
[41:25]
advisory committees to help us as we're
[41:28]
going through all this information and
[41:30]
that's made up of the engineers and
[41:32]
public works and the staff of your
[41:34]
cities. So let me introduce this is
[41:37]
project A
[41:41]
and let me introduce this is project B.
[41:44]
Now, if we were out on a field review
[41:47]
and you pulled up and saw project A and
[41:49]
you pulled up and saw project B, they
[41:52]
look pretty close, right? There's not
[41:55]
much of a difference between either
[41:58]
project. At least what we can see, we
[42:00]
can handle, we can look at them, but
[42:02]
they both look like they're doing their
[42:04]
job. They both look like they're a good
[42:06]
project, but we've got nothing to
[42:09]
compare. So that's why we send out all
[42:12]
of those forms requesting information so
[42:15]
that we can generate data. So we can get
[42:18]
data. So let's go after some data
[42:30]
here. We got some data
[42:33]
just to reduce the mess. All right.
[42:38]
So
[42:39]
project A
[42:41]
we sent out the concept report and we
[42:45]
said project A tell us the length of the
[42:48]
project
[42:50]
they responded. So
[42:53]
project A sent in the concept report.
[42:55]
They got information on how many the AAD
[42:59]
that the traffic volumes they got
[43:02]
information on the the length of the
[43:05]
project. They got information on the
[43:08]
condition of the project and that
[43:11]
project
[43:12]
looks like
[43:14]
a pretty good project.
[43:18]
So project A supplied us with the data
[43:21]
we needed
[43:23]
to know what's entailed in that project.
[43:26]
Well, project B, they also submitted a
[43:29]
concept report. They also prepared the
[43:32]
information and told us how long the
[43:34]
project is. They also told us what the
[43:37]
traffic volumes are in the facility
[43:43]
and and they also told us the conditions
[43:47]
of the facility.
[43:51]
Again, it was great to get the data from
[43:54]
the city,
[43:56]
but well, let's end it now.
[44:01]
And if we're going after these projects,
[44:04]
I don't know about you, but me myself, I
[44:06]
would choose project A. Project A just
[44:09]
has a lot more data. It has the
[44:12]
information that's going to accomplish a
[44:15]
lot more than project B if we went
[44:17]
solely on the data that was collected on
[44:21]
the forms, right? Sometimes that's not
[44:25]
the only thing we're looking at on a
[44:26]
project. Case in point, we had a safety
[44:30]
improvement project years ago, but there
[44:33]
was no safety concerns. There had never
[44:36]
been an incident. There had never been
[44:38]
an accident. There had never been an
[44:40]
issue. But we've got this safety
[44:42]
concern. We've got all of this projects,
[44:45]
millions of dollars of requests, but not
[44:47]
much. So, the data was just like this.
[44:51]
all these other guys are showing a lot
[44:53]
of information
[44:55]
and this one just didn't have enough
[44:57]
information that would help sell that
[45:00]
project. So, we started to look at other
[45:02]
things. So, let's look at some of those
[45:04]
professional relevant information or
[45:07]
relevant professional information that
[45:10]
we could consider.
[45:15]
So we went out on a field review
[45:19]
and on that field review we looked at
[45:22]
the projects.
[45:24]
Project A, you got a pretty good
[45:26]
project. But while we were out there on
[45:28]
project B, we were standing alongside a
[45:31]
busy road that had a very narrow
[45:34]
shoulder that had a ditch next to that
[45:36]
shoulder while little ones were coming
[45:39]
to school, walking between that white
[45:42]
stripe and the edge of the ditch, just
[45:45]
inches, maybe a foot or two from cars
[45:48]
that are passing. What did that tell us
[45:51]
on that field review? Well, that let us
[45:54]
know that, hey, this project is pretty
[45:57]
important.
[45:59]
Well, then we looked at sponsor project
[46:03]
history. Well, you know, our project
[46:06]
sponsors overall, we've got awesome
[46:08]
cities. We work with some of the best
[46:10]
people in the industry. And you know
[46:13]
what? Project A people, well done. They
[46:16]
are out there hustling. They're making
[46:18]
that project happen. But you know, same
[46:20]
thing. Project B. Those guys are out
[46:23]
there making things happen. We're
[46:25]
getting our projects on time. We're
[46:27]
saving the funds by getting those
[46:29]
projects built earlier. Well, then we
[46:32]
went out and we started to look at
[46:34]
programwise, how are we on equity of
[46:36]
funding? Well, you know, on project A,
[46:39]
there's a lot of big projects that are
[46:41]
going on right now. Project B, it's been
[46:44]
a while since we've been back out there
[46:46]
with funding for that project. So
[46:49]
project B, you know, we recognize that
[46:52]
we haven't had much funding in this area
[46:55]
right now. So project B. Well, then
[47:01]
we look at project synergy. Now this
[47:04]
what I had to I forgot this had to go
[47:06]
back out in the fridge to get we can't
[47:08]
go without synergy. So a synergy is when
[47:12]
this project happens, what's it going to
[47:14]
bring with it? What's happening in the
[47:16]
area? Maybe there's another project
[47:18]
that's going to happen. We got a couple
[47:20]
of things that are going to tie into
[47:21]
that. But this project synergy, if this
[47:24]
project happens right now, we're going
[47:26]
to get a lot bigger bang for the buck.
[47:28]
So,
[47:34]
project B, you got it. This is synergy.
[47:37]
Project A, we recognize it's good
[47:40]
project, but it's it's that's the
[47:43]
project right now. We don't have much to
[47:45]
build from right now. Well, then you
[47:49]
know,
[47:50]
timing efficiencies,
[47:53]
that's a big one.
[47:55]
And with our projects, both A and B are
[47:58]
doing really good. So, we're going to
[48:01]
recognize Sorry about that. A well,
[48:05]
whoa. And B, look at you. All right. So,
[48:09]
we've got
[48:11]
that there. But you know there's a whole
[48:14]
list of things that we're going to go
[48:15]
through but right now on this example
[48:18]
we're going to look at one last part
[48:21]
and that's how does this project relate
[48:22]
to the system?
[48:25]
Well,
[48:27]
project B with everything that's
[48:29]
happening with your project,
[48:33]
you have
[48:35]
my tweezers are too big
[48:39]
and my hands too nervous.
[48:41]
>> Ben, I figured out why you got all the
[48:43]
engineers and the public works directors
[48:46]
to participate.
[48:50]
All right. So, a cherry on top signifies
[48:54]
Thank you.
[48:56]
signifies that this is a total project.
[49:01]
When we get this project, we're
[49:03]
completing the system. We're filling the
[49:05]
gap. We're making things complete. This
[49:09]
one might be the very first project in
[49:11]
that segment, which is a good thing. But
[49:13]
right now, let's wrap up and fill the
[49:16]
gap and complete the project. So now I
[49:20]
come back
[49:25]
and he's deflating a little. But
[49:29]
now which project
[49:32]
would have the delicious effect or would
[49:36]
be the best project for the amount of
[49:40]
funds for the time that we're
[49:43]
programming right now would be project
[49:46]
B. Wouldn't you agree?
[49:49]
Project B has the information. So when
[49:53]
we get into talking about the projects,
[49:56]
we want to look at the data, but we also
[49:59]
want to keep in mind the significance
[50:01]
that those other relevant professional
[50:04]
considerations have on the project. Now,
[50:07]
you know, it's not as cool or as fun
[50:10]
just to look at ice cream. We're going
[50:12]
to award these by draw the number on who
[50:16]
gets project A and who gets project B.
[50:18]
So, so for all of you, you'll notice
[50:20]
where you're sitting. Boy, we're sorry
[50:23]
for those of you online. This is
[50:24]
incredibly delicious and we hope that
[50:26]
you're salivating at your stations. But
[50:29]
for those of you who are here online,
[50:30]
you'll notice a number. Rosie, if you
[50:33]
could kind of explain or or tell us.
[50:39]
I have a random number generator from 1
[50:43]
through 27
[50:46]
and the first number is number 19.
[50:51]
» Oh, I think that council member is the
[50:54]
closest.
[50:56]
>> Sandy city seems to have been awarded a
[50:59]
project.
[51:02]
» So, you get project A. Did you need more
[51:06]
professional considerations?
[51:10]
» Appreciate it.
[51:13]
>> Project B.
[51:14]
is number two.
[51:17]
>> Alex,
[51:21]
» that is a great UTA project. Lots of
[51:24]
synergy with the system.
[51:25]
>> We You need us to add more data to that.
[51:33]
» Thanks.
[51:34]
All right. But that's no fair for us to
[51:36]
sit and watch while they eat. So, we've
[51:39]
got ice creams for everybody here. So,
[51:42]
>> yay,
[51:49]
» Ben. Thank you. I'm going to say as
[51:50]
these as ice cream is being handed out
[51:54]
in this room, everybody gets ice cream
[51:56]
and every project is funded as
[51:59]
represented by the ice cream. And just
[52:02]
as Ben is uh uh closing up his
[52:04]
evaluation process,
[52:07]
I'll just note that unfortunately
[52:11]
in the real world,
[52:13]
we can't fund every transportation
[52:16]
project.
[52:18]
>> All right, got a napkin.
[52:20]
>> Here's an there's project funding
[52:22]
evaluation happening for those folks
[52:24]
that are online. Just bear with us for a
[52:26]
moment.
[52:28]
I'm so glad to see that Ben's got the
[52:30]
scoop on the projects.
[52:33]
>> Okay.
[52:34]
>> Well, you got fruit.
[52:35]
>> I've got strawberry and orange.
[52:37]
>> Orange.
[52:38]
>> And there's ice cream, too.
[52:41]
>> Orange. There you go.
[52:43]
>> Oh, yeah.
[52:45]
>> Thank you.
[52:47]
>> Be delicious.
[52:49]
For
[52:49]
>> those of you who are on the line, we're
[52:51]
going to be done just a bit. Please be
[52:53]
patient with us.
[53:00]
Dirk, from your comments earlier today,
[53:01]
does that kind of answer your questions
[53:03]
with regards to all the different things
[53:05]
that go along with it?
[53:08]
>> I think that was a sweet explanation.
[53:10]
>> He's really cool with his words.
[53:14]
>> Oh,
[53:14]
>> but I could tell that was kind of nutty
[53:17]
towards the end.
[53:18]
>> Will you put that in the freezer?
[53:20]
>> Yeah. I just feel I feel bad that
[53:22]
Haramman isn't jetting or Riverdale
[53:24]
aren't there no projects for them. I
[53:27]
mean ice cream ice cream
[53:29]
>> just to be clear about what we're
[53:31]
talking about here. So again, Mr. Chair,
[53:34]
just to be super clear about this.
[53:37]
>> Um we wish that we had enough funding
[53:42]
that every community could get the ice
[53:45]
cream that they want. We wish that every
[53:47]
project that was applied for there was
[53:50]
enough res resources for that but that's
[53:53]
not the case. We can't give uh we don't
[53:56]
have enough money to award every
[53:58]
project. Right Ben? Right. And so we
[54:00]
have to do this really thoughtful and
[54:03]
thorough process of evaluating projects
[54:07]
as Ben said using data objective
[54:11]
criteria and then also
[54:14]
uh other relevant professional
[54:16]
considerations and all of that goes into
[54:18]
the decisions we make. So Ben, thank you
[54:21]
so much.
[54:21]
>> Thank you Andrew. Thank you. And so
[54:30]
ah there we go. A boy. So, so with this
[54:36]
combined effort, um, as we go through
[54:39]
the information, hopefully that helps as
[54:42]
we identify the projects that you can
[54:46]
recognize
[54:48]
and understand and um, feel free to ask
[54:53]
questions as we move through the
[54:55]
projects, but there's quite a few. And
[54:58]
so
[55:00]
in your meeting materials is a copy of
[55:04]
the data sheets for each of the
[55:06]
programs. So this is what the data sheet
[55:09]
looks like for the CMAC program. You can
[55:12]
see those projects that are highlighted
[55:14]
in yellow. Those are the projects that
[55:16]
are being recommended. And you can see
[55:19]
in the blue column there on the left,
[55:22]
that's the amount of funds that are
[55:23]
being recommended for the project. And
[55:26]
so this is the CMAC program and you can
[55:29]
see the biggest um evaluation on the
[55:33]
CMAC is the emissions analysis. We need
[55:37]
to de demonstrate that we've got air
[55:39]
quality benefits, right?
[55:42]
So then we have the CRP or the carbon
[55:45]
reduction program and the the format is
[55:48]
the same but the carbon reduction
[55:51]
program requires that we show a
[55:53]
demonstration of reduction of CO2
[55:57]
and so you can see how that and we'll go
[56:00]
through the projects. Then we've got the
[56:03]
TAP funds. And I I might highlight too
[56:06]
that that on our team, the short range
[56:09]
team is Wayne is our our coordinator on
[56:13]
the short range team and oversees our
[56:15]
work here and and the efforts that are
[56:18]
being made. Far there she is the one who
[56:22]
takes the lead in the evaluation of the
[56:25]
data on the the CMAQ and CRP programs.
[56:30]
This program that's showing here, this
[56:32]
is the TAP program or the transportation
[56:34]
alternative program. Hume Van Wagon is
[56:37]
the one who takes the lead on this. And
[56:40]
we've got actually three things that
[56:42]
we're looking when we're programming TAP
[56:45]
funds. The blue identifies those capital
[56:48]
improvements. The red are project
[56:51]
studies or plans and the green is safe
[56:54]
routes to school. So if it's a blue
[56:57]
project, you can see the points are in
[57:00]
the blue. If it's a red project, you can
[57:01]
see where the points are in red and
[57:04]
green. If it's in green and that's how
[57:06]
the projects are evaluated so that we
[57:08]
can evaluate like projects against like
[57:12]
projects.
[57:14]
Then at the last table that we'll look
[57:17]
at there, this is the surface
[57:19]
transportation or STB program. And as
[57:22]
you can see the various criteria on that
[57:25]
project as well. And these are the
[57:27]
tables included in your meeting meeting
[57:30]
materials. So we have all of this
[57:33]
information. We go through all of the
[57:35]
projects and as the chair indicated,
[57:38]
we're going to look at the CAQ and the
[57:40]
CRP programs together because they're so
[57:44]
closely related and you're going to see
[57:46]
that some of the projects cross
[57:48]
programs. So here's where we go and and
[57:52]
I might add mayor to your question
[57:54]
earlier some of these projects are also
[57:56]
going to show in other programs as well.
[58:00]
We try to identify the funds for the
[58:03]
projects that'll get us the biggest
[58:05]
benefit right now. So let's start here
[58:09]
in the the CMAC program here. We've got
[58:12]
three projects that are being
[58:13]
recommended in the Ogden Leighton area.
[58:15]
Those three projects total up to $5
[58:18]
million being recommended from the TAC
[58:21]
committee to Transcom. In the Salt Lake
[58:23]
area, we've got six projects that are
[58:26]
recommended from the TAC to Transcom.
[58:29]
They total 9.6 plus million. So, we're
[58:33]
going to go through these nine projects
[58:34]
fairly quick. And so, here they are. So,
[58:37]
this is the first project in the Ogden
[58:39]
Lake urban area. This in South Weber. is
[58:42]
a South Weieber UD do project on 27 East
[58:44]
and South Weber Drive. This is to widen
[58:48]
for turn lanes as well as intersection
[58:51]
improvements. The estimated project cost
[58:53]
on this is 3.7 plus million. Funds being
[58:57]
requested are 3.3
[58:59]
plus million and the TA committee
[59:01]
recommended a million dollars.
[59:04]
The next project is a project in
[59:07]
Clearfield. This is on 1000 East just
[59:11]
there on SR 193. This is to construct a
[59:14]
pedestrian bridge that would go north
[59:16]
and south over SR 193. Estimated project
[59:20]
cost on this project is 20 plus million.
[59:23]
Funds being requested are 17.6 million.
[59:27]
The tax committee recommended 2 million.
[59:29]
Now, I'm going to pause right there
[59:31]
because I can see some of you wonder,
[59:33]
well, that's a drop in a bucket. We're
[59:35]
never going to build that with that. The
[59:37]
intent is on some of these projects to
[59:40]
recognize or acknowledge to everyone
[59:42]
involved that the regional council
[59:44]
identifies this as a priority project
[59:47]
that facilitates when that project
[59:49]
sponsor now then goes after other
[59:51]
funding. They can use our funds for a
[59:53]
match towards other funds and then they
[59:56]
can go after other money. We also leave
[59:58]
the door open so that they can come back
[1:00:00]
and ask more from our money too. But we
[1:00:03]
want to try to spread those funds out
[1:00:05]
and utilize the best resource we can to
[1:00:08]
work together to accomplish a priority.
[1:00:12]
And so then the next project here, the
[1:00:14]
last one in the Ogden Leighton area is
[1:00:17]
for the Davis Salt Lake Connector. And
[1:00:19]
this is for operations. And as you may
[1:00:22]
remember, this goes from Farmington City
[1:00:24]
all the way up through the U to research
[1:00:26]
park. Estimated cost is 18 plus million.
[1:00:30]
Funds being requested were 5 million.
[1:00:32]
The TA committee recommended $2 million
[1:00:35]
for this project. Now we move into the
[1:00:37]
Salt Lake area. The first project and
[1:00:40]
that's Oh,
[1:00:42]
yes, please. M
[1:00:45]
if they are awarded say the 2 million,
[1:00:47]
it's a $20 million project. How long do
[1:00:50]
they have to use that before they can
[1:00:53]
how long can they hold on to that as
[1:00:54]
they collect other funds until we say
[1:00:59]
it's taken too long and we move that on
[1:01:01]
to a different project?
[1:01:02]
>> Mayor, that's an excellent question. So,
[1:01:05]
in the CMAC funds and the STB funds,
[1:01:07]
we're actually programming these funds
[1:01:09]
for 2032. So, right out of the gate,
[1:01:12]
we've got six years for that. But we
[1:01:15]
also control how fast those funds move
[1:01:18]
forward. If we see that the city is
[1:01:20]
working hard, trying to do things, we
[1:01:23]
can just keep bumping those funds back
[1:01:25]
and just letting other projects go
[1:01:27]
around them until we get enough funds.
[1:01:30]
And so sometimes on some projects it the
[1:01:34]
momentum builds fast and other times it
[1:01:36]
takes a little longer for things to get
[1:01:38]
going and then they happen. Case in
[1:01:41]
point is the MVX that we just talked
[1:01:43]
about today. 20 years on the program.
[1:01:46]
The first funding for that came
[1:01:47]
available in 2020 or 2019.
[1:01:53]
Um sometime it was so it's been a number
[1:01:56]
of years that we've all been working to
[1:01:58]
try to make this project happen. Mayor
[1:02:00]
Burton, just one thing though that I've
[1:02:02]
noticed is is while that's all good and
[1:02:05]
true and it's awesome that they'll hold
[1:02:07]
those money those monies the what we've
[1:02:10]
experienced is oft times the project
[1:02:13]
cost the total project cost continues to
[1:02:16]
accelerate faster than we're ability our
[1:02:19]
ability to raise those monies. So there
[1:02:21]
is an expeditious or or hurry up and get
[1:02:25]
it done component to that. We've also
[1:02:28]
seen in our area sometimes when this
[1:02:32]
would be for 2032 if you're ahead of
[1:02:35]
schedule sometimes they can be bumped
[1:02:37]
up. So maybe you can get it instead of
[1:02:39]
2032 you might get it for 2030 or 2031
[1:02:42]
because because others have done that
[1:02:44]
and they kind of shift things around. So
[1:02:46]
just a couple of things we've noticed up
[1:02:48]
our way.
[1:02:50]
>> Thank you Mr. Chair. because I find
[1:02:51]
that's real important. In our city, we
[1:02:53]
have this the same issues and sometimes
[1:02:55]
we do a project like we're on 13th West,
[1:02:58]
which has been in the works for similar
[1:02:59]
to this UTA project for like 20 years.
[1:03:02]
And if we had lost those funds that were
[1:03:05]
there originally, then we'd be in
[1:03:07]
trouble today, but we saved those and
[1:03:09]
added them up over the years. So that's
[1:03:11]
why I asked the questions if they ever
[1:03:13]
dissolved and go away or if they stay
[1:03:15]
there. It's all because you see the
[1:03:16]
project is is gathering momentum. Ben,
[1:03:20]
let me add on to that. In part, what
[1:03:23]
Mayor Burton is is getting at is
[1:03:25]
depending on the funding source, and
[1:03:27]
these are federal funds that we're
[1:03:29]
awarding here, um, federal funds, you can't just hold on to them
[1:03:34]
indefinitely. They there are actual
[1:03:36]
federal requirements for when they're
[1:03:38]
spent, but that's not exactly what's at play here. We receive an
[1:03:44]
allocation of federal funds every year
[1:03:47]
and we WFRC working with our partners do
[1:03:51]
an excellent job, Ben, Wayne and team do
[1:03:54]
an excellent job of of making sure that
[1:03:58]
those funds are put to use that are
[1:04:00]
spent. We have a better track record in
[1:04:02]
Utah than just about any other state in
[1:04:04]
the nation of making sure that we're not
[1:04:06]
giving any funds back. We're dynamically
[1:04:09]
managing the program. WFRC working with
[1:04:13]
UD do collaborating with UTA
[1:04:16]
uh navigating with Salt Lake County and
[1:04:18]
the fundings that the funds that they
[1:04:19]
distribute and periodically adjusting
[1:04:22]
the funding sources for various various
[1:04:24]
projects to make sure that they're used.
[1:04:26]
What this plan the TIP the
[1:04:29]
transportation improvement program does
[1:04:31]
these awards are for outy years. It's we
[1:04:34]
so when that project is ready to go then
[1:04:36]
we'll be able to apply real funds to it.
[1:04:39]
So the fact that it's out a few years
[1:04:40]
doesn't mean that the funds are in
[1:04:42]
jeopardy. The real requirements come
[1:04:45]
under federal law and regulation which
[1:04:47]
kind of a separate management process
[1:04:50]
that we're that we mind very very
[1:04:52]
carefully to make sure that uh funds are
[1:04:54]
not lost and we we work with all of the
[1:04:57]
communities to make sure that when the
[1:04:59]
project is ready when you're ready then
[1:05:01]
the funds are actually available for
[1:05:03]
you.
[1:05:05]
>> Thank you Andrew. Thank you mayor. Um,
[1:05:08]
and it just occurred to me too, I
[1:05:10]
recognized uh this side of our short
[1:05:12]
range plan staff. I didn't recognize
[1:05:15]
Rosie or Jordan. Both of them are
[1:05:17]
significant. Rosie helps us on the field
[1:05:20]
review planning and scheduling, as well
[1:05:22]
as she's in a different team, but we
[1:05:24]
claim her as part of the short range.
[1:05:26]
And then Jordan administers all our tech
[1:05:28]
committees, too. So, you'll hear a lot
[1:05:30]
from them. They really are driving the
[1:05:32]
show. The rest of us are just in the
[1:05:34]
wagon. So, as we move forward here on
[1:05:38]
this particular project in uh is the
[1:05:41]
first one in South Salt Lake on 300
[1:05:43]
West. This is for a bike and ped
[1:05:45]
facility between 2100 South to Haven
[1:05:48]
Avenue. Little more than a quarter mile
[1:05:50]
in length. Project estimated cost 1.2
[1:05:53]
plus million. Funds being requested are
[1:05:55]
1.1 plus million and the TAC recommended
[1:05:58]
the full requested amount. The next
[1:06:00]
project is a request from UTA. This is
[1:06:03]
for operating cost on the 5600 West
[1:06:07]
which is um the hub from the old Bingham
[1:06:10]
Highway up to now into town. Um the
[1:06:14]
estimated operating costs on that
[1:06:16]
project is sorry I cut that off there
[1:06:19]
but it's 7 plus million. Funds being
[1:06:22]
requested are uh 4.5 million
[1:06:26]
and the attack recommended the $2
[1:06:28]
million for the operating cost. The next
[1:06:31]
project here is an intersection project
[1:06:33]
in Salt Lake City. This on Chapeta Way
[1:06:36]
and Wakara Way. This is to take a
[1:06:38]
four-legged intersection and and
[1:06:40]
construct a roundabout. Estimated
[1:06:43]
project cost is 1.5 plus million. Funds
[1:06:46]
being requested are 1.4 plus million and
[1:06:49]
the funds that were recommended was the
[1:06:51]
amount requested by the city on the
[1:06:54]
project. The next project is a a project
[1:06:57]
in Sandy City. This is on 1210 East in
[1:07:00]
SR 209. It's an interesting project, one
[1:07:03]
that changed dynamics in the field view.
[1:07:06]
Initially, the project was requesting a
[1:07:08]
hawk or a pedestrian hybrid beacon
[1:07:13]
at this crossing here of 90th South.
[1:07:16]
This is 90th 94th South there at about
[1:07:19]
12 East. Uh the amphitheater there to
[1:07:22]
the north and the overflow parking
[1:07:25]
across the street there below the
[1:07:27]
hospital.
[1:07:28]
When we were out there and about, it was
[1:07:30]
identified by the Department of
[1:07:32]
Transportation. We're way too close to
[1:07:33]
the signal for a a ped crossing signal.
[1:07:36]
We can't do that. And so that's why the
[1:07:39]
description talks about a a hawk
[1:07:41]
pedestrian signal. But working with the
[1:07:44]
department, they identified that we
[1:07:46]
would need some form of separated
[1:07:49]
facility. So, in a real quick military
[1:07:52]
in the field type of action, we
[1:07:54]
identified that an underpass would be
[1:07:57]
less expensive than an overpass. An
[1:08:00]
underpass would cost about $5.5 million.
[1:08:03]
So, the request was for $4 million and
[1:08:06]
the TAC recommended $2 million towards
[1:08:09]
that underpass.
[1:08:12]
The next project is in Bluffale. That's
[1:08:14]
on 146 South. Um, this is between
[1:08:17]
Springway Parkway to 13th West. About a
[1:08:21]
third of a mile. It's the the yellow
[1:08:23]
line there. Estimated project cost is a
[1:08:27]
little more than $4 million. Funds being
[1:08:29]
requested is $1.5
[1:08:32]
million and the TAC recommended the full
[1:08:35]
requested amount of 1.5.
[1:08:39]
The last project in the Salt Lake area
[1:08:41]
is a request from South Jordan. This is
[1:08:43]
on Shields Lane. This is phase two.
[1:08:45]
Phase one was reviewed and recommended
[1:08:47]
last year. This goes between 3200 west
[1:08:50]
and 2700 west. Little about a half mile
[1:08:53]
in length. Estimated project cost 5.6
[1:08:57]
plus million. The funds being requested
[1:08:58]
are 5.2 plus million and the tax
[1:09:01]
recommended from this pot of money 1.5
[1:09:04]
million.
[1:09:06]
And that is all the projects in the
[1:09:08]
CMAC. So now quickly into the CRP
[1:09:10]
program. Mr. Chair, we're okay.
[1:09:16]
Please. Thank you. So, in the carbon
[1:09:19]
reduction program, we have two requests
[1:09:21]
or two projects being recommended in the
[1:09:24]
Ogden Lane area totaling 1.3 plus
[1:09:26]
million. Four projects in the Salt Lake
[1:09:29]
area um with the funding total of 3
[1:09:32]
million. So, the first project in the
[1:09:35]
Ogden Leighton is a request from UTA.
[1:09:37]
This is for their Vampool expansion
[1:09:39]
program. This is for the Davis Weber
[1:09:42]
County. This is to purchase 10 new
[1:09:45]
additional vans for expansion. Uh the
[1:09:48]
project estimated cost is 500,000 funds
[1:09:51]
being requested 466,000
[1:09:54]
plus. TAC recommended the requested
[1:09:56]
amount of 466,000
[1:09:58]
plus. The next project is a request from
[1:10:01]
UD do. This is on I-15 and 31st Street.
[1:10:05]
This is the interchange. What this is is
[1:10:08]
to widen the ramp. This is southbound
[1:10:11]
there at 31st Street to to widen the
[1:10:14]
ramp and install ramp meters to help
[1:10:17]
reduce the congestion on mainline I-15.
[1:10:20]
Estimated cost is a million dollars.
[1:10:22]
Funds being requested 932,000 plus the
[1:10:26]
TAC recommended the full requested
[1:10:28]
amount. Then we move into the Salt Lake
[1:10:30]
area. In the Salt Lake area, the TAC
[1:10:33]
recommended that we also approve
[1:10:35]
additional funds for the vampool
[1:10:37]
expansion in the Salt Lake County. They
[1:10:39]
were requesting 500,000. The funds being
[1:10:43]
uh they were requesting 466,000. The
[1:10:46]
project cost was 5500,000
[1:10:49]
and this is also for 10 vehicles in the
[1:10:52]
Salt Lake area. The TAC recommended that
[1:10:54]
full requested amount. The next project
[1:10:57]
in the Salt Lake area is the bike share
[1:11:00]
expansion. Um this is to continue to
[1:11:04]
expand on that bike share program. Uh
[1:11:06]
the request is uh 647,000.
[1:11:11]
The TAC recommended 400,000 for this
[1:11:14]
project. The next project
[1:11:17]
is a project in South Jordan, the
[1:11:20]
Shields Lane project. This is phase two.
[1:11:22]
We just reviewed this one in the CMAC
[1:11:24]
program. The request is for 5.2 two plus
[1:11:28]
million dollars and the TAC recommended
[1:11:31]
out of this program we do $1.5 million
[1:11:34]
for the Shields Lane project.
[1:11:39]
Then oh I guess we had one more there on
[1:11:41]
the South Salt Lake. This is on the
[1:11:43]
Griggsson neighborhood byway project.
[1:11:45]
Now byway projects pretty exciting.
[1:11:48]
These are is improvements throughout the
[1:11:51]
neighborhood. You can see the red line
[1:11:53]
there identifying the project lengths.
[1:11:55]
These are improvements that help those
[1:11:58]
who may not be spandex bike rider types
[1:12:01]
that are the neighborhood with the
[1:12:03]
stroller type areas to be able to
[1:12:05]
commute from one area to another. This
[1:12:08]
goes from 7 east to Washington Street.
[1:12:11]
Funds being requested is a little more
[1:12:13]
than a million dollars or the project
[1:12:16]
cost funds being requested are just
[1:12:18]
under a million dollars and the tax
[1:12:20]
recommended 633,000
[1:12:23]
for this project.
[1:12:26]
That's all the projects in the CMAC and
[1:12:28]
the CRP.
[1:12:30]
Perfect. Questions regarding that?
[1:12:34]
If not, members, I'm looking for a uh
[1:12:38]
I'm recommending that the regional
[1:12:39]
council approve these projects
[1:12:41]
recommended to be added to the draft of
[1:12:43]
the 2027 through 2032 congestion
[1:12:46]
mitigation air quality program and the
[1:12:48]
2028 carbon reduction program. Uh
[1:12:52]
can I get a motion as such? I move to
[1:12:54]
approve.
[1:12:55]
>> Thank you, Mayor Burton.
[1:12:57]
Dan Dug in a second. Any other questions
[1:13:00]
or comments? With that, I'll place that
[1:13:02]
motion for vote. All in favor?
[1:13:05]
Great. Any opposed online? Unanimous
[1:13:09]
eyes. Great. Thank you. Now, if we'll
[1:13:11]
move forward, Ben, now we're going to
[1:13:13]
ask him to review these uh
[1:13:15]
transportation alternative programs or
[1:13:17]
the TAP, different than the TIP. and uh
[1:13:21]
go ahead if you'll take care of those if
[1:13:22]
you would please.
[1:13:23]
>> Thank you, Mr. Chair. So, we had three
[1:13:26]
projects in the Ogden Lane area that
[1:13:28]
were recommended uh totaling more than
[1:13:30]
1.3 plus million and there were three
[1:13:33]
projects in the Salt Lake area totaling
[1:13:35]
2.4 million. So, we're going through
[1:13:37]
those projects starting in the Ogden
[1:13:40]
Lake urban area. First project is in
[1:13:42]
Ogden. This is on SR39. This is for a
[1:13:45]
shared use path. This is phase two.
[1:13:48]
Phase one is to the west of this yellow
[1:13:50]
circle. This is from Mountain Road to
[1:13:52]
Whisper Word Development. This area has
[1:13:55]
no sidewalks. Those people from anyone
[1:13:58]
that lives north of this road are
[1:14:00]
required to come down and walk on the
[1:14:02]
shoulder of SR39.
[1:14:04]
Uh the estimated project cost is 523,000
[1:14:07]
plus. Funds being requested were 488,000
[1:14:11]
plus and the TAC recommended the
[1:14:13]
requested amount of 488,000.
[1:14:16]
The next project is a request in North
[1:14:19]
Salt Lake. This is on Cutler Drive. This
[1:14:21]
to install sidewalk in this area between
[1:14:24]
Robinson Drive to Center Street. Uh
[1:14:27]
about a third of a mile in length.
[1:14:29]
Estimated project cost 877,000
[1:14:32]
plus. Funds re requested are a little
[1:14:35]
more than 700,000
[1:14:37]
plus and the TAC recommended the
[1:14:39]
requested uh amount of 790,000 plus.
[1:14:45]
The next project, the last one in the
[1:14:47]
Ogden Leighton area, is the green bike
[1:14:50]
program in the Ogden Leighton area. Only
[1:14:52]
this one's a little different.
[1:14:54]
Currently, right now, they use a
[1:14:55]
rickshaw type to balance their vehicles,
[1:14:57]
which means that they ride with a bike
[1:15:00]
with the trailer, grab the extra bikes,
[1:15:03]
and ride to another station and drop off
[1:15:05]
the bikes and move the bikes around
[1:15:07]
because they need to get that
[1:15:09]
distribution out so that the bikes can
[1:15:11]
get used so that no station is sent
[1:15:14]
empty. So, to really expand that program
[1:15:16]
is limited because of the poor guy
[1:15:18]
driving around on a bike pulling a
[1:15:20]
trailer to deliver the bikes. The intent
[1:15:22]
of this request is to purchase an
[1:15:25]
electric van that they can use as a
[1:15:28]
mobility or the the mobile distribution
[1:15:32]
vehicle as well as haul equipment uh
[1:15:36]
that may be necessary to repair or to uh
[1:15:39]
keep things going. Um the project
[1:15:42]
estimated cost is 100,000. Funds being
[1:15:45]
requested is 93,000. TAC recommended
[1:15:48]
that amount. The next project is a
[1:15:51]
project in Midville. This is on the
[1:15:53]
Bingham Junction Boulevard. This is for
[1:15:55]
bike pad improvements between 7087 South
[1:15:59]
to Center Street almost a mile in
[1:16:01]
length. Estimated project cost is 500
[1:16:04]
plus thousand. Funds being requested are
[1:16:07]
404,000
[1:16:08]
plus and the TAC recommended 400,000 for
[1:16:12]
this project.
[1:16:14]
The next project is a project in South
[1:16:17]
Jordan. It's on the Shields Lane. This
[1:16:18]
is phase two of this project
[1:16:21]
and the request is for 5.2 plus million
[1:16:25]
and the TAC recommended a million
[1:16:27]
dollars from this program to complete
[1:16:30]
the Shields Lane project.
[1:16:34]
The next project is in Midwell. This on
[1:16:36]
the Jordan River Bridge. This is a bike
[1:16:38]
pad improvement. Um they're at about 67
[1:16:42]
South on the east side of the river and
[1:16:43]
then 67 South on the west side of the
[1:16:46]
river. There you can see where the
[1:16:48]
parks, where the trail, it all ends at
[1:16:50]
the river. And so the idea is to
[1:16:53]
construct a bridge there. The project
[1:16:55]
estimated cost 1.3 million. Funds being
[1:16:58]
requested are 1.2 plus million. And the
[1:17:01]
funds being recommended are a million.
[1:17:04]
And that's all of the projects for the
[1:17:05]
TAP program.
[1:17:08]
Great. Thank you. Are there any
[1:17:09]
questions for Ben?
[1:17:11]
With that, I'm looking for a motion to
[1:17:12]
recommend that the regional council
[1:17:14]
approve the projects recommended to be
[1:17:16]
added to the draft 2028 transportation
[1:17:18]
alternatives program.
[1:17:22]
» So moved.
[1:17:24]
>> Thank you, Carlton.
[1:17:26]
>> Second,
[1:17:27]
>> Mr. Dugan. Thank you for that. I want
[1:17:28]
you all to know that you also all of you
[1:17:30]
can participate in those. But we
[1:17:33]
appreciate Carlton and Dan leading out.
[1:17:36]
We appreciate your leadership amongst
[1:17:38]
this group. Great. If there's no other
[1:17:40]
questions, uh, we'll place that for
[1:17:42]
vote. All in favor?
[1:17:44]
>> I.
[1:17:45]
>> Are there any opposed? Great. That
[1:17:48]
passes unanimously. Great. Perfect. Now,
[1:17:50]
we'll talk to Ben about projects
[1:17:52]
recommended to be added to the 2027
[1:17:53]
through 2032 surface transportation
[1:17:56]
program. Ben, thank you, Mr. Chair. So,
[1:17:58]
in this program, we had seven projects
[1:18:01]
in the Ogden Lake area that are being
[1:18:03]
recommending totaling more than $17.8
[1:18:06]
million. In the Salt Lake urban area, we
[1:18:09]
have 11 projects being recommended
[1:18:11]
totaling almost $25 million. We'll go
[1:18:14]
through those projects here
[1:18:17]
in a timely manner. The first request
[1:18:19]
here is in from Clinton City. This on
[1:18:22]
2300 North. This is phase two. This is
[1:18:24]
for reconstructing a narrow two-lane
[1:18:27]
facility with minor widening to create a
[1:18:30]
uniform crosssection with travel lanes,
[1:18:32]
shoulders, curb gutter, and sidewalk.
[1:18:35]
It's the blue line there on the picture.
[1:18:37]
The project estimated cost is $8
[1:18:39]
million. Funds being requested are $2.5
[1:18:42]
million. The tax recommended the full
[1:18:45]
requested amount of 2.5. The next
[1:18:48]
project is a project in Centerville
[1:18:50]
City. This some Parish Lane. This is to
[1:18:52]
reconstruct Parish Lane between Main
[1:18:55]
Street or SR 106 to 400 East. Uh about
[1:18:59]
3/4 or a third of a mile in length.
[1:19:01]
Estimated project cost 1.7 plus million.
[1:19:05]
Funds being requested are 1.25 million
[1:19:08]
and the TAC recommended the full
[1:19:10]
requested amount of 1.25.
[1:19:13]
The next project is a project in West
[1:19:15]
Point. This is on 3500 West. This is
[1:19:18]
also to reconstruct with minor widening
[1:19:21]
to take a narrow two-lane facility,
[1:19:23]
widen it to a three-lane crosssection
[1:19:26]
with shoulder, curb gunner, and
[1:19:27]
sidewalk. This project is estimated to
[1:19:30]
cost 4.2 two plus million. Funds being
[1:19:32]
requested are 2.1 plus million and the
[1:19:35]
tag committee recommended 2.1 million.
[1:19:39]
The next project is a project in
[1:19:44]
this is a Utah West Point project. This
[1:19:46]
an intersection project that will be
[1:19:48]
greatly impacted as SR u well as the
[1:19:52]
west Davis highway is extended here
[1:19:55]
going towards 1800 north from 193. This
[1:20:00]
intersection here at 1800 north and 4500
[1:20:02]
west um is a is an important
[1:20:06]
intersection to where everyone coming
[1:20:08]
off the new Mountain View corridor will
[1:20:11]
drop down to this road and and dead end
[1:20:14]
essentially because of the bottleneck.
[1:20:16]
Um it's an offset intersection. Um West
[1:20:20]
Point is the first one to come after for
[1:20:22]
funding on this. Then UD do stepped in.
[1:20:24]
The initial request was for $3 million,
[1:20:27]
but UDOT stepped in and says, you know,
[1:20:29]
if we can get $1.5 million for this
[1:20:32]
project, we will come and we will
[1:20:35]
address the other legs of the
[1:20:36]
intersection. We've got currently just
[1:20:39]
about a million dollars already
[1:20:40]
programmed here. So that million plus
[1:20:43]
1.5
[1:20:44]
will bring it up to where UDOT will come
[1:20:46]
in and address three legs of the
[1:20:48]
intersection with other funding. So this
[1:20:52]
is one of them synergy types of
[1:20:53]
projects. Um the other project we are
[1:20:57]
the next one is in Leighton. It's on the
[1:20:59]
Leighton Parkway Extension between 3200
[1:21:02]
West to 3,700 West half mile in length
[1:21:05]
of new construction. Estimated project
[1:21:08]
cost 4.8 plus million. Funds being
[1:21:10]
requested are 3.8 plus million and the
[1:21:14]
TAC recommended that we program 2.5
[1:21:17]
million for this project. The next
[1:21:19]
project is a project in Ogden. This on
[1:21:22]
Second Street. This is phase two to the
[1:21:24]
improvements on Second Street which go
[1:21:26]
east of uh Washington Boulevard. This
[1:21:30]
project will widen with a uniform
[1:21:32]
crosssection, improved curb, gutter, and
[1:21:34]
sidewalk on this project. Estimated cost
[1:21:36]
is 8.7 plus million. Funds being
[1:21:39]
requested are 5.3 plus million. And the
[1:21:42]
TAC recommended that we program $4
[1:21:44]
million for this project.
[1:21:48]
The next project is a request from Far
[1:21:50]
West City. This on 3,300 North between
[1:21:53]
2575 West to 2000 West or SR26.
[1:21:58]
Uh this will widen a narrow two-lane
[1:22:00]
facility, curb gunner, and sidewalk.
[1:22:03]
It'll address a bridge with a narrow
[1:22:04]
crossing and also include sidewalks.
[1:22:08]
This project is estimated to cost a
[1:22:10]
little more than $9 million. funds being
[1:22:12]
requested was 4.5 plus million and the
[1:22:15]
TAC recommended 4 million on this
[1:22:17]
project. The next project moves us into
[1:22:22]
Sandy City. Uh this is an intersection
[1:22:24]
on 7th east and 8800 South or Sai Road.
[1:22:28]
Um this project is to realign the
[1:22:32]
intersection there with the signal.
[1:22:34]
Estimated project cost is 3.8 plus
[1:22:37]
million. Funds being requested are 3.1
[1:22:40]
plus million and the TAC recommended 1.5
[1:22:43]
million for this project.
[1:22:46]
The next project is a project in Salt
[1:22:49]
Lake City. This is on Wakara Way. This
[1:22:52]
is to reconstruct Wakara Way. This road
[1:22:54]
is long lived its life. This will
[1:22:56]
improve it from Foothill Drive up to
[1:22:59]
Upper Drive. Um it's estimated cost 5.4
[1:23:04]
plus million. funds being requested are
[1:23:06]
a little more than $5 million and the
[1:23:09]
TAC recommended that we program $3
[1:23:11]
million on this project.
[1:23:13]
>> Ben, is this the same car away where the
[1:23:16]
roundabout you talked about earlier?
[1:23:17]
>> It is only the roundabout is a little
[1:23:19]
further east.
[1:23:21]
>> Thank you.
[1:23:23]
>> The next project is a request from
[1:23:26]
Holiday City. This is on Highland Drive.
[1:23:28]
This is to reconstruct with minor
[1:23:30]
widening. This is a project that they're
[1:23:32]
phasing. They've divided it into pieces.
[1:23:34]
They're going after multiple sources. Uh
[1:23:37]
this body's recommended funding in the
[1:23:39]
past for this project as well. This
[1:23:42]
phase is estimated to cost $6.4 plus
[1:23:44]
million. Uh they're requesting $5.8
[1:23:48]
million and the tax committee
[1:23:50]
recommended that we program $3 million
[1:23:52]
on this project.
[1:23:55]
The next project is a project in Mil
[1:23:58]
Creek. This is also on Highland Drive.
[1:24:00]
This is to reconstruct and address the width of this facility here giving
[1:24:06]
us a uniform cross-section. Estimated
[1:24:08]
project cost is 7.8 plus million. Funds
[1:24:12]
being requested are 7.2 plus million and
[1:24:15]
attack recommended $3 million for this
[1:24:17]
project.
[1:24:20]
The next project is a request from Sandy
[1:24:22]
City. This is on that crossing there
[1:24:26]
where the amphitheater to the north with
[1:24:28]
the parking across. You can just imagine
[1:24:30]
at night when that amphitheater wraps up
[1:24:32]
and all of those people are coming
[1:24:34]
across the street with no crossing.
[1:24:37]
They're just dodging cars as they move
[1:24:39]
forward. We have not had a safety
[1:24:42]
concern here. So, it's been a real
[1:24:44]
blessing, but we've got a safety concern
[1:24:47]
that we got to address. This project, as
[1:24:50]
we earlier talked about, is being
[1:24:51]
recommended that we build an underpass.
[1:24:54]
Project estimated cost $5.4 $4 million
[1:24:57]
funds being requested or 4 million and
[1:25:00]
the TAC recommended that we program 1.5
[1:25:02]
here giving us a total of $3 million
[1:25:05]
programmed on this project.
[1:25:08]
The next project is a project in West
[1:25:10]
Valley. This is a project that they've
[1:25:12]
been working on for a number of years
[1:25:14]
with Magna between 4100 South and 3500
[1:25:17]
South. They've also divided this into
[1:25:19]
segments. This addresses the
[1:25:24]
pavement reconstruction with uniform
[1:25:26]
cross-section with completing the
[1:25:28]
sidewalks, curb, and gutter on both
[1:25:29]
sides and improving that existing curb,
[1:25:32]
gutter, and sidewalk. This particular
[1:25:35]
project is $23 plus million.
[1:25:38]
They are requesting $7.7 plus million to
[1:25:42]
complete this project in discussion with
[1:25:45]
the project sponsor and with the ability
[1:25:47]
to move those project funds forward. TAC
[1:25:50]
recommended $3 million so that this
[1:25:52]
project can move forward
[1:25:55]
with the understanding that they should
[1:25:58]
have enough.
[1:26:00]
The next request is from Draper. This on
[1:26:02]
Fort Street. This is to reconstruct with
[1:26:04]
minor widening. This is one facility
[1:26:07]
that they may need to shrink because of
[1:26:09]
the the width in some areas between 132
[1:26:12]
south and 138 south. Um almost a mile in
[1:26:15]
length. Estimated project cost 11.5 plus
[1:26:19]
million. Funds being requested are 10.6
[1:26:22]
plus million and a tag committee
[1:26:24]
recommended $3 million for this project.
[1:26:28]
The next project is a project in Murray
[1:26:30]
City. This on 6400 South. Murray City
[1:26:34]
has done a diligent job on working at
[1:26:36]
one road at a time over multiple years
[1:26:39]
requesting the funds. This is to seed
[1:26:42]
this project with funds. Estimated
[1:26:44]
project cost 10.5 plus million. Funds
[1:26:47]
being requested are 9.8 eight plus
[1:26:49]
million. The TAC recommended we program
[1:26:51]
$3 million on this project.
[1:26:56]
The next project is a request from UD
[1:26:58]
do. This is on 7200 South. As you the
[1:27:02]
northbound lanes, as you go online,
[1:27:04]
you've got as you go on to I-15, you've
[1:27:07]
got a blind corner. As you come around,
[1:27:09]
you've got a merging lane that you have
[1:27:12]
a lot of accidents because this ramp is
[1:27:14]
so narrow. The idea, the intent is to
[1:27:17]
widen this facility so that it
[1:27:19]
eliminates that merge. The estimated
[1:27:21]
project cost is 7.3 plus million. Funds
[1:27:24]
being requested are 2 million. TAC
[1:27:27]
recommended that we program $2 million
[1:27:30]
for this project.
[1:27:33]
The next project is a project in
[1:27:35]
Haramman. This is on 126 South um and
[1:27:39]
Haramman Main Street. This is a very
[1:27:41]
busy area. This is a very large
[1:27:42]
intersection, but there's some big
[1:27:45]
unknowns on this because this is in the
[1:27:47]
same area where in not too long in the
[1:27:50]
future, the Mountain View corridor is
[1:27:52]
going to be separated facility, whereas
[1:27:54]
now it this as you travel east goes into
[1:27:57]
an intersection. Their intent is to
[1:28:00]
improve the intersection because of
[1:28:02]
backup that goes um to the west and and
[1:28:06]
to the south. Estimated project cost is
[1:28:09]
4.7 plus million. Funds being requested
[1:28:12]
are 4.2 plus million. The TAC
[1:28:15]
recommended we put a million dollars on
[1:28:16]
this project till we see what happens
[1:28:18]
with Mountain View and then we can
[1:28:20]
address what improvements need to be
[1:28:21]
made and know. But we wanted funds on
[1:28:24]
this to identify it as a priority
[1:28:27]
project.
[1:28:28]
The next project that we have is a
[1:28:30]
request from Riverton. This on 128 South
[1:28:33]
at Beehive Parkway.
[1:28:36]
Um, this is between South Jordan Canal
[1:28:38]
and 1300 West. Estimated project cost is
[1:28:42]
a little more than a million dollars.
[1:28:43]
Funds being requested are 976,000
[1:28:46]
plus and attack recommended the full
[1:28:49]
requested amount of 976,000.
[1:28:53]
That's all of the projects in ASB
[1:28:55]
program. Mr. Chair,
[1:28:57]
>> thank you, Ben. Any questions for Mr.
[1:28:59]
Wrich?
[1:29:01]
Great. So, I'm looking for a motion. I'm
[1:29:04]
looking for a motion to recommend that
[1:29:07]
the regional council approve the
[1:29:08]
projects recommended to be added to the
[1:29:10]
2027 through 2032 surface transportation
[1:29:12]
program.
[1:29:15]
>> So moved.
[1:29:17]
>> Thank you, Mr. Souza.
[1:29:21]
» I'll I'll second it. Chair is not going
[1:29:23]
to recognize your second. I'll look for
[1:29:25]
another second.
[1:29:26]
>> I'll second that.
[1:29:27]
>> Thank you so much. Appreciate that. I've
[1:29:30]
heard some other Thank you so much.
[1:29:31]
Appreciate your participation. Finally.
[1:29:34]
Okay, there's no other questions.
[1:29:37]
I'll make a mo uh I'll place this motion
[1:29:40]
for vote. All in favor?
[1:29:42]
>> I.
[1:29:42]
>> Great. Any opposed? That passes
[1:29:44]
unanimously. Thank you so much, Ben.
[1:29:46]
Let's give Ben a special round of
[1:29:48]
applause for today.
[1:29:51]
» Thank you to all of you. Thank you.
[1:29:56]
>> Great. Now, if all of you would pull out
[1:29:58]
your phones, please. All of you pull out
[1:30:00]
your phones if you would, please. If you
[1:30:04]
transcom appears on your calendar,
[1:30:06]
Andrea does such a wonderful job getting
[1:30:08]
those out to us and the staff. I I I
[1:30:11]
just would like you to put on your phone
[1:30:12]
for next year that we've got the ice
[1:30:16]
cream social, so to speak, in April or
[1:30:18]
May of next year. Make sure you attend.
[1:30:20]
For those online, if you don't hit that
[1:30:23]
one, it might happen again for you in
[1:30:25]
your next lifetime. But just uh put that
[1:30:27]
on your put that on your calendar. but
[1:30:29]
also our next transcom meeting will be
[1:30:31]
held on Thursday, June 18th, uh likely
[1:30:35]
around the same time at 1:30. Andrew,
[1:30:38]
any questions for you?
[1:30:39]
>> Go ahead. Sorry,
[1:30:40]
>> I'm going to end the meeting. If not,
[1:30:43]
>> I shouldn't stand in the way of that. I I did just want to make a one brief
[1:30:46]
comment. We appreciate your indulgence
[1:30:50]
with the object lesson uh with the
[1:30:52]
delicious object lesson explaining the
[1:30:55]
process. We know that this work that we
[1:30:58]
do can be can seem a little dry
[1:31:00]
sometimes. There's a lot of detail to go
[1:31:03]
through. There's a lot of processes to
[1:31:05]
go through. We take it really seriously
[1:31:08]
to do this work well and effectively and
[1:31:11]
use good information and be transparent
[1:31:13]
about what we do and have lots of
[1:31:15]
engagement with the communities and with
[1:31:18]
you. And so, uh, we, uh, Ben has has,
[1:31:22]
um, does an amazing job managing the
[1:31:24]
program in collaboration with all of
[1:31:25]
his, uh, partners. And we hope that you,
[1:31:28]
uh, appreciate our attempt to explain
[1:31:32]
the way that we, uh, do that work. Um,
[1:31:34]
take a little extra time to have a
[1:31:36]
little bit of fun as well. So, thanks to
[1:31:38]
all of you.
[1:31:39]
>> Thank you.
[1:31:41]
>> Anything else? Dirk, go ahead.
[1:31:42]
>> I just want to remind everybody about
[1:31:43]
the Golden Spoke is May 16th, so hope to
[1:31:46]
see you out riding on the trail. What's
[1:31:47]
that, Mayor Burton?
[1:31:49]
>> What's the golden spoke? That's an
[1:31:50]
opportunity to ride your bicycle on the
[1:31:52]
Jordan River Trail and they'll be ending
[1:31:54]
at the Tracy Aviary.
[1:31:57]
So, depending wherever you live, start
[1:31:59]
from that point and then end up at Tracy
[1:32:01]
Aviary.
[1:32:02]
>> You can start in the mouth of Ogden
[1:32:04]
Canyon
[1:32:05]
>> and ride the second longest contiguous
[1:32:07]
bike trail all the way to Provo if you
[1:32:09]
like and stop on your way. longest uh
[1:32:13]
continuous separated familyfriendly
[1:32:16]
bike trail west of the Mississippi in
[1:32:18]
the United States.
[1:32:19]
>> Say that fast three times.
[1:32:21]
>> I will not.
[1:32:24]
>> Great. I'll look for a final motion.
[1:32:28]
>> Motion to adjurnn.
[1:32:29]
>> Thank you so much.
[1:32:31]
>> Second.
[1:32:31]
>> Non-debatable. We're adjourned.
[1:32:37]
» Very nice. Was she your friend?