Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
These are YouTube's auto-generated captions, not a human transcript — expect occasional errors, especially with names and technical terms.
[0:00]
I pledge allegiance to the flag of the
United States of America, and to the
[0:03]
republic for which it stands, one nation
under God, indivisible, with liberty and
[0:08]
justice for all.
[0:18]
» Can I get a roll call?
>> Mr. Tim Clayton.
[0:21]
» Present.
>> Mr. John Gerwinski.
[0:22]
» Here.
>> Ms. Amy Blake.
[0:24]
» Here.
>> Mr. Nick Bellone.
[0:26]
» Here.
>> Mr. Tony Clark.
[0:27]
» Here.
>> Mr. Michael Duffy.
[0:29]
» Here.
>> Mr. David Austin.
[0:31]
» Present.
>> And I am Michael Mambers. Good evening.
[0:34]
» Good evening.
Um
[0:37]
Let's see. We have a public comment for
agenda items. Anybody wishing to speak?
[0:41]
» Yes.
>> Step on up to the mic. Name and address
[0:45]
for the record, and speak away.
[0:49]
» I haven't had practice.
>> All right.
[0:52]
» Kim Lantee, uh 11204
Putnam Drive.
[0:57]
Wednesday, June 24th, in the evening, we
had a major
[1:02]
uh rainstorm.
>> Mhm.
[1:03]
» And the south end of our street
uh completely flooded up to the garage.
[1:12]
People's actual garages. Um the school
the preschool that's there was also
[1:18]
flooded, and water was coming from
there.
[1:20]
The sewer was not draining. It was not
plugged. And um I think six houses on
[1:25]
that end uh were affected.
Couldn't get into their their homes
[1:31]
uh safely. So,
um and I that's the second time that's
[1:36]
happened. I 2 years ago, that happened
also, and someone's car ended up being
[1:41]
totaled because it was parked in that
area
[1:45]
where it flooded. Um and then the water
actually
[1:50]
drained like all of a sudden, like
somebody turned a pump on, and
[1:54]
and uh vortexed it it down. So,
I just wanted to raise this as an issue.
[2:01]
I don't know if it can be looked into or
what the issue is.
[2:04]
» can look into it, for sure.
>> So.
[2:07]
» Okay, I just had a question real quick.
>> Yes.
[2:10]
I do we have video also?
>> Yeah, I got a guy.
[2:14]
» So, that would be your personal
property?
[2:16]
» Uh,
this is mine and it was down here.
[2:21]
» down at the south end of the world.
>> end. Yes.
[2:23]
» In the back?
>> Yeah, it was uh uh over the front here.
[2:25]
So,
>> Okay, so all around the property?
[2:27]
» All this was flooded. Water was coming
down from there.
[2:30]
» Okay. Thank you.
>> All right, thank you.
[2:32]
» That's the guy that'll be able to look
into it.
[2:34]
» Got it?
>> So, yeah, we're good. We'll look into it
[2:36]
and we'll figure this out for you.
>> All right.
[2:38]
» Okay, thank you.
[2:43]
Um, there are no citizens requesting
placement on the agenda and then we have
[2:48]
minutes to be approved. Hopefully you
had time to review and I'll take a
[2:51]
motion on the storm water board meeting
minutes from June 23rd.
[2:55]
» Uh, Mr. President, I was not here, so I
will be abstaining from any voting on
[2:59]
this.
>> I make a motion to approve the storm
[3:02]
water board minutes from June 23rd,
2026.
[3:06]
» I'll second it.
All those in favor?
[3:10]
» Aye.
>> And John abstains.
[3:17]
All right.
Uh, staff reports. Tony.
[3:21]
» That's good evening.
>> Good evening.
[3:23]
» Um,
I am looking to do a project out at the
[3:27]
at the public works. Um,
scope of the project is needed to
[3:30]
capture a storm water from the new
street department building and the
[3:34]
properties to the east and south.
The water will be conveyed into ditches
[3:37]
and swales, which will be excavated
during construction.
[3:41]
We are looking to pave around the
building and the driveway going to 112th
[3:45]
uh, to eliminate and keep manageable
from dirt, dust, and maintenance.
[3:51]
First of all, we'll go with the ditch on
the south side of the building
[3:54]
will be constructed first, approximately
460 ft long by 3 ft wide.
[3:58]
Uh
storm water from the downspouts of the
[4:01]
street department will be done as
follows.
[4:04]
Um
we're going to try to capture the water
[4:07]
coming off the roof and getting it into
its system so it doesn't get in front of
[4:10]
everything.
South side of the building will be will
[4:13]
be piped directly to the ditch at the
downspout locations using an 8-in SDR 26
[4:18]
heavy wall pipe. North side of the
building will have
[4:23]
the downspouts tied into 10-in SDR 26
pipe that runs from the west end of the
[4:27]
building to the east side of of the
building
[4:30]
with an open grade structure and it
includes a 1-ft
[4:32]
sump to collect sediment before heading
northeast uh to the existing culvert
[4:37]
going to Deer Creek ditch.
The piping running northeast will be a
[4:41]
12-in C900 DR 18 to accommodate heavy
loads in that area.
[4:47]
Um and then the paving we are looking to
pave from the garage doors, garage door
[4:53]
approaches, 30 ft to the south and north
sides of the building and 60 ft on the
[4:58]
east side of the building to accommodate
a parking lot.
[5:02]
Paving on the north and south sides will
be having 2% slope away from the
[5:05]
building runoff. Remainder of the paving
will include
[5:09]
paving around the salt barn and the
driveway going from 112 all the way down
[5:13]
to the salt barn area.
Paving contractor is responsible for
[5:16]
grading the site prior to asphalting.
Um
[5:21]
so the next page shows you
a couple of proposals that I got
[5:25]
uh for the piping and ditch work.
Piping ditch work and swale LGS Plumbing
[5:30]
came in at $78,836.
Um
[5:35]
and the
and the price per board for for storm
[5:38]
water would be $26,280.
Um
[5:42]
H2O Plumbing came in at $75,000.
That brings us to the price per board at
[5:46]
$25,000.
Uh Prowse for paving site services
[5:51]
$225,138.
Price per board $75,046.
[5:57]
And American Paving came in
um with a price per board of the storm
[6:02]
at $35,268.
Um
[6:07]
My recommendation is as following. H2
Plumbing for the piping and the ditch
[6:11]
work in the amount of $75,000. American
Paving in
[6:15]
uh for the paving at $105,800.
Total
[6:19]
uh project cost $180,800.
Um the sewer board portion $60,266.67.
[6:26]
Storm water board portion will be
$60,266.67.
[6:30]
And the town council will be
$2,060,266.66.
[6:35]
You can add them up.
Any questions?
[6:38]
» Uh
I The only question I have is I don't
[6:40]
know if our engineers looked at this. Is
this paving for it is the asphalt going
[6:43]
to be adequate for this heavy load
trucking? Mike, do you know?
[6:47]
» I've not looked at the proposal, but I
we have we should
[6:51]
» That That's my concern. Two and a half
inches of binder and an inch and a half
[6:53]
of surface. I just don't know if that's
enough for these trucks.
[6:55]
» It'll depend on a lot of It'll depend on
what the stone base is that's existing
[7:00]
underneath it.
Uh that that would be consistent with
[7:03]
our our road profile, but
we don't know what the stone stuff would
[7:08]
be under.
>> And like I said, the heavy loading is my
[7:10]
concern. I just I just My My thing would
be have them look at it. Just make sure
[7:13]
that we're getting what we pay for and
not redoing this in a few years. That's
[7:17]
just me though.
>> I I'm sorry. I didn't hear what you
[7:18]
» I'm just saying I would rather have our
engineer look and make sure that what
[7:21]
they're proposing this four inches of
pavement is adequate and the base is
[7:24]
adequate. I just don't want to
do it and then have to band-aid it again
[7:27]
and again.
>> Yeah.
[7:28]
» That's my only comment. So.
>> Well, yeah. So, I mean, just just so you
[7:31]
know, the base is pretty solid. I mean,
we've had
[7:34]
25 26 ton salt trucks coming in and out
of there for years. We've had no issues
[7:38]
with any
anything sinking or you know, or or
[7:43]
anything out of that nature, they've
held up really well. Um
[7:46]
and then in you know, where the back of
the property where there was uh
[7:51]
some bad soils, we dug it all the way
down to the clay,
[7:54]
approximately almost 3 ft down,
and we filled it with grindings, layered
[7:59]
we layered it 6 in at a time, compacted
it, filled it up to where we needed it
[8:03]
to be, and we have our tandem and
everything driving across it.
[8:07]
Nothing has nothing has gone down,
nothing has sank.
[8:10]
No ruts, no nothing. So, I I think that
we have a pretty decent base out there.
[8:13]
If somebody wants to look at it, I have
no problem with that.
[8:18]
» But that's my only concern.
>> I know there's a time time sensitive on
[8:22]
it. Is there something that you guys can
get out there and take a look at it uh
[8:25]
relatively quickly?
>> I wouldn't see any reason not to,
[8:28]
you know, move this forward and I I
would imagine Tony, the way I read the
[8:32]
the proposal briefly, I just read it
real quick, they put money in there for
[8:37]
uh
an allowance that you could order extra
[8:40]
stone if we needed it if if there was a
problem. So, I think that that would be
[8:45]
similar to any other road project. If if
we discover a problem, they just change
[8:49]
order in a couple tons of stone and we
move on.
[8:57]
» So, your ask is pretty much similar to
what the
[9:02]
sewer board?
>> Yep.
[9:06]
» So, that would be
on contingent of approval of all boards.
[9:11]
Is that about right what I hear what I
heard?
[9:14]
» It It was a $60,000 number.
>> Yeah. Yeah, the $60,000 266.67
[9:20]
cents.
>> Yes.
[9:22]
» And then contingent on approval of all
three boards.
[9:27]
» If you wanted to.
>> Sewer board chose to make it contingent,
[9:30]
you can if you like.
>> All right.
[9:33]
I don't see need. I think that
[9:37]
a straight up is
this is what one of the things that we
[9:41]
do is we're facing a new
drainage.
[9:45]
But
[9:48]
I can entertain a motion if anybody is
ready to do so.
[9:55]
» I'll I'll make a motion that we um
contract H2O Plumbing for the piping and
[10:02]
ditch work in the amount of $75,000
and our portion of altogether $75,000
[10:08]
for H2O Plumbing, American Paving for
$105,800.
[10:11]
Total project $180,800
and this this board's portion would be
[10:15]
$60,266.67.
[10:21]
» Second.
>> All right.
[10:23]
» Motion by John, second by Amy.
Any discussion?
[10:28]
Hearing none, all those in favor?
>> Aye.
[10:30]
» Aye.
[10:32]
» All right.
[10:35]
I have a quick question for you.
>> Sir.
[10:37]
» Um we had talked at previous meetings
about getting out to 103rd.
[10:42]
Um any movement on that to get that
jetted?
[10:47]
Get that jetted and or scooped out. I
don't know if they cleared out the brush
[10:50]
the brush that was there.
>> I've been having some health issues last
[10:52]
this last month. So I haven't been able
to get out there to take a look at it. I
[10:56]
mean we got out there with the uh tire
that we mowed everything down around the
[10:59]
front of it that you see.
Um so now that uh
[11:04]
you know, depending on this last rain
that we had, I don't know how much
[11:06]
water's flowing through there but
you know, we had talked about doing some
[11:10]
sort of a
damming system in front of it so we can
[11:13]
try to clean it out.
You know, we're going to put a camera
[11:16]
down there to see what it looks like at
least.
[11:18]
» Okay.
>> Just with the
[11:20]
that thing's got to be what, 12 ft lower
than the road level?
[11:24]
» Uh at the lowest point I would say I'd
say about 10 to 12 ft, yeah.
[11:27]
» Yeah, so we just I want to get in there
with a camera.
[11:30]
» Okay.
>> Run the camera down there.
[11:32]
Um see what it looks like. You know, we
have to have the water levels low.
[11:36]
Okay. It would have been last week.
>> All right.
[11:40]
» So, I'm on that.
>> Okay.
[11:43]
I just want to keep it on keep it on the
radar so we can get that
[11:46]
take care of it and get another thing
scratched off the list. So, excellent.
[11:51]
All right. Any other questions for Tony?
Hearing none none, let's move on to new
[11:56]
business.
It's a recommendation to the town
[11:58]
council consideration of an interlocal
agreement with the Little Calumet River
[12:01]
Basin Development Commission for the
East 117th Avenue Drainage Improvement
[12:06]
and Watershed Study Projects.
Nick, you want to talk to me?
[12:10]
» We reported on this. I think it was at
this board.
[12:14]
Could have been at the council. But, we
received some
[12:18]
funding from the Little Calumet River
Basin Development Commission to study
[12:21]
drainage
on East 117th Avenue primarily between
[12:25]
sort of the town borders area and Ben
Street. So, that stretch through there.
[12:31]
Uh
[12:34]
It requires an interlocal agreement with
the community.
[12:38]
Just wanted to get the Stormwater Board
sign off on this. It actually gets
[12:41]
executed at the town council, but I
thought it made sense for the Stormwater
[12:44]
Board to have some involvement on a
stormwater board or a stormwater item in
[12:49]
town and a known issue that we've had
for a long time.
[12:53]
» Makes sense.
>> The Little Calumet River Basin is
[12:55]
picking up 80% of
So, 80/20.
[13:00]
» And this is
again for the
[13:03]
the study to see
>> Well, they probably remember us looking
[13:08]
at this once before. But, we
didn't have the means to do much more
[13:13]
than what we were able to do.
[13:16]
We had applied to the River Basin
Commission and
[13:20]
we weren't successful at that point. So,
we did what we could. We reapplied and
[13:25]
they are sponsoring their portion of the
study so we can look at a more global
[13:29]
solution to that whole area over there.
Is the big issue is that pipeline that's
[13:34]
running
>> Yeah, we got the old railroad and the
[13:36]
pipe that goes underneath it and now
we've got so much more traffic down
[13:40]
there with the schools.
And
[13:43]
the subdivisions and the 117th has
gotten a lot more important in that zone
[13:48]
since that time.
>> Okay.
[13:50]
Um,
any ideas how long this will take?
[13:54]
» The watershed analysis?
>> Yes.
[13:57]
» Uh, Frank's already kind of started it.
>> Okay. That's fine.
[14:01]
» So it shouldn't take an exorbitant
amount of time but I would imagine we'll
[14:04]
have it done before the end of the year.
>> Wonderful. Okay.
[14:09]
Any questions?
>> No.
[14:11]
» All right. Now I'll entertain a motion.
>> Um, Mr. President, I'd like to make a
[14:14]
favorable recommendation to the town
council for consideration of the
[14:17]
interlocal agreement with the Little
Calumet River Basin Development
[14:20]
Commission for East 117th Avenue
Drainage Improvement Watershed Study
[14:23]
Project.
>> Second.
[14:26]
» Motion by John, second by Amy.
Discussion?
[14:29]
Hearing none, all those in favor?
>> Aye.
[14:31]
» Aye.
[14:33]
All right. Treasurer's report.
>> Uh, good evening everyone. For your
[14:38]
consideration
and approval,
[14:41]
uh, we have a total of three claims this
evening
[14:44]
for a grand total of $9,317.55.
[14:53]
» I'd like to make a motion to pay the
claims for July in the amount of
[14:57]
$9,317.55
as presented here.
[15:02]
» Second.
>> Motion by John, second by Amy. Any
[15:05]
discussion?
Hearing none, all those in favor?
[15:08]
» Aye.
>> Aye.
[15:09]
» Aye.
Uh, next Storm Water Board meeting will
[15:11]
be Tuesday, August 25th. I'll entertain
a motion.
[15:14]
» Motion to adjourn.
>> Second.