2:22:08
Continuing on a 14 and in conjunction with the land disturbance permit. The applicant will have its traffic engineer prepare a speed study to determine whether the speed limit can be lowered.
1:08:06
…because there's a lot more right-of-way acquisition required for the roundabout design. So they're driving those costs. As well as when these original cost estimates were done was in 2017-2018, so as you know everything has went sky-recorded, so that's another reason why the costs have gone up.