2:02:48
They've got to know PPP contract. Their contract for the OPP is under 7 million. The cost of their building was, I think they said 133, 000 might have been, I think it was 133, 000 to operate their building plus some other cost to it.
17:42
Versus the major where there's a full technical studies required to support the application. So you're seeing two full studies such as the stormwater management report and an EIS or geotechnical or whatever type of study that would be involved in reviewing that.