We'll start again. All right. I'd like
[0:02]
to call this meeting to order. Um,
[0:03]
welcome everybody to what feels like the
[0:05]
first real day of summer. This is a
[0:08]
joint study session between the council
[0:11]
and the plan with the study with the
[0:13]
council and the planning commission.
[0:16]
So with that, um, can we do roll call?
[0:21]
>> Yes. Starting with council. Council
[0:23]
member Walter present. Council member
[0:25]
Hasco here. Vice Mayor Hufty
[0:31]
» here.
[0:32]
>> Mayor Taylor
[0:33]
>> present.
[0:33]
>> We have a quorum. And for planning
[0:36]
commission, Commissioner Vatra
[0:38]
>> here.
[0:39]
>> Commissioner Tark is absent.
[0:42]
Commissioner Morris
[0:43]
>> here.
[0:44]
>> Vice Chair Kinsky
[0:45]
>> here.
[0:46]
>> Chair Brothers,
[0:47]
>> I'm here.
[0:48]
>> We have a quorum.
[0:49]
>> Thank you.
[0:51]
So, I'd like to remind everybody that
[0:53]
there's no decisions being made tonight.
[0:54]
This is a study session. Um, the goal as
[0:57]
we go through this is to give staff some
[1:00]
direction. Um, and then staff's going to
[1:03]
incorporate our comments from tonight,
[1:06]
public comments up through June 30th, I
[1:08]
believe, um, and then revise the
[1:12]
document, bring it back to the planning
[1:13]
commission, and then from the planning
[1:15]
commission will come back to council.
[1:16]
So, I just wanted to give people sort of
[1:18]
a general context. So, with that, I'd
[1:20]
like to open up oral communications. Is
[1:22]
there anybody who wants to speak on
[1:23]
something that's not on this agenda?
[1:26]
Rita.
[1:34]
» Oh, okay. Um,
[1:38]
» okay. Fine. Um,
[1:41]
all right. So, Rita, so I think I'm
[1:43]
going to get based on that. I think I'm
[1:46]
gonna
[1:51]
do Do you mind? I mean
[1:53]
>> if it's point of order, you have to take
[1:55]
it.
[1:58]
» I don't think
[2:02]
» but any Yeah. No, go ahead. No. No.
[2:03]
>> The point of order question this
[2:05]
document that's part of the packet.
[2:07]
There's a lot of acronyms and color
[2:09]
coding, but I didn't see a key
[2:11]
>> telling me what those acronyms are, what
[2:14]
they mean, and what the color codes
[2:17]
mean. If someone has that, they can
[2:19]
share it. I really appreciate it. Thank
[2:22]
you.
[2:23]
>> Okay. Thank you.
[2:26]
>> No, fair enough.
[2:28]
>> Okay. So, moving on to the regular
[2:29]
agenda. Um the first one is receiving an
[2:32]
update from the resilience um planning
[2:35]
town council ad hoc subcommittee. I
[2:38]
don't know if that's exactly what our
[2:39]
title was, but it's close.
[2:41]
Um, so this is a subcommittee um that
[2:44]
Rebecca and I were on and you saw in the
[2:49]
um council packet basically a report
[2:52]
back from us. I'm not going to go back
[2:54]
and read it. I do apologize somehow when
[2:56]
it got into the packet. The first time
[2:59]
half of it got was missing. So the whole
[3:02]
discussion is missing. So as long as you
[3:04]
got the more recent one there sort of
[3:06]
red line the stuff that was supposed to
[3:08]
be there.
[3:09]
>> It did not. Okay. Did you get the latest
[3:13]
council packet?
[3:14]
>> I did, but I didn't open it because I
[3:16]
didn't know there were changes.
[3:17]
>> I got it by
[3:19]
>> Okay. Well, um, in any case, there
[3:21]
there's more discussion. Um, I can speak
[3:24]
and again, this is just to pro provide
[3:28]
some input and you can read it unless
[3:30]
people feel like they want me to read
[3:32]
the pieces that are here. Um but it was
[3:35]
basically some discussion on how the
[3:37]
council or how the subcommittee was
[3:40]
um and then it talked a little about the
[3:42]
safety and resilience list and there was
[3:45]
also in the packet a description of the
[3:47]
safety and resilience list. So it
[3:49]
basically captured most of that. Um the
[3:52]
goal um for tonight was just to because
[3:55]
we're going to be talking about the
[3:56]
safety element and this is sort of
[3:58]
adjunct to the safety element was just
[4:01]
to quickly talk about this. So we had
[4:02]
this in the background
[4:05]
and the idea of the safety and
[4:06]
resilience list was this is not a
[4:09]
commitment on the part of the council or
[4:12]
committees but the goal was to get
[4:14]
safety related tasks in a place that we
[4:17]
would a sort of remember it was there
[4:19]
and then make sure that periodically it
[4:21]
was reviewed and that we need as a
[4:24]
council to come up with a policy on how
[4:26]
to deal with this. Um and there's a
[4:28]
proposed policy here but that's not for
[4:30]
tonight. That's just
[4:34]
so does that make enough sense for
[4:37]
people to give it context?
[4:39]
>> Are you going to ask for comments?
[4:41]
>> I can ask for I'm just trying to get the
[4:43]
general sense because I mean Judith was
[4:45]
confused.
[4:45]
>> I look I am confused. Yeah.
[4:47]
>> Um so I I read the initial packet.
[4:52]
Um I am worried. I'm trying to call up
[4:55]
right now what the red line is and I
[4:57]
don't have it. So, I'm not feeling very
[4:59]
comfortable that I'm going to make
[5:01]
informed comments that are still
[5:03]
relevant.
[5:03]
>> Okay.
[5:04]
>> So, how do I locate that? I'll go ahead.
[5:07]
>> You go to the town website, the calendar
[5:10]
>> website,
[5:11]
>> and then you go to tonight's special
[5:13]
meeting and you download the agenda. You
[5:15]
would get it that way or Veronica sent
[5:17]
out the links to the updated packet. So,
[5:21]
e either direction will get you there. I
[5:23]
mean, I'm happy just to I can read it. I
[5:25]
mean, it's what got left out was the
[5:27]
discussion part. And so, I'll read
[5:29]
literally what's here.
[5:30]
>> Okay.
[5:31]
>> The town safety element of our general
[5:33]
plan is the overarching view of our
[5:35]
approach to the town's safety
[5:36]
priorities. The safety element when
[5:39]
paired with a set of safety and
[5:40]
resilient initiatives begins to address
[5:42]
in a concrete way the significant safety
[5:45]
issues.
[5:46]
The safety can I Hey, Mary, can I ask
[5:49]
you guys to
[5:51]
I'm going to read this. Let's not have
[5:53]
two conversation. Thank you. Um, the
[5:55]
safety and resilience list provides a
[5:57]
more detailed oriented view. The safety
[6:00]
element of the town of Portola Valley
[6:02]
general plan was last updated July 28,
[6:05]
2010. The first public draft safety
[6:08]
element was circulated for public review
[6:10]
in October 2022. The town received
[6:12]
comments from the public key town
[6:14]
committees including geologic safety
[6:16]
committee, wildfire preparedness
[6:18]
committee, community planning and
[6:20]
assistance for wildfire sepaw subst
[6:23]
Excuse me, I'm trying to do this
[6:24]
quickly. Um, sustainability committee
[6:26]
and the emergency preparedness
[6:27]
committee. All the comments have been re
[6:30]
reviewed and many have been incorporated
[6:32]
into the safety element as policies. The
[6:35]
remaining comments have been moved to
[6:37]
the um safety and resilience list. Um,
[6:39]
and then the attached safety and
[6:41]
resilience list is a first draft. The
[6:43]
final list will be available shortly.
[6:45]
So, that's all that was missing. Um, and
[6:46]
then a recommendation, um, and this is
[6:49]
what I was referring to, um, is we
[6:51]
recommend that the town council
[6:52]
formalize the safety and resilience list
[6:54]
and an associated process at a future
[6:56]
council meeting. So, that's the full
[6:58]
extent that was missing.
[7:00]
>> Okay. Um, and then, you know, if you
[7:02]
scroll down in the packet, there's this
[7:05]
there's a sort of description of the
[7:07]
safety resilience list with the various
[7:10]
descriptions of the different um, titles
[7:12]
that are there. Um,
[7:15]
and again, I just brought, you know,
[7:17]
Rebecca and I just wanted to get that
[7:18]
here tonight so people had an idea. This
[7:20]
is definitely a death. So there's a lot
[7:23]
of duplication because this was a very
[7:25]
compressed I was going out of town for a
[7:27]
week. This is all very compressed. So
[7:29]
treat the actual list itself as very
[7:31]
much a draft.
[7:34]
So with that um excuse me let me open up
[7:37]
for clarifying questions and if there
[7:40]
aren't any then I'll go to the public
[7:41]
and then I'll come back and we can have
[7:43]
a quick discussion among us. I would ask
[7:46]
like to ask you since it is the the duty
[7:49]
of the planning commission to maintain
[7:51]
the general plan. Uh and we've never
[7:54]
seen this resilience list, how you see
[7:57]
the list going to the planning
[7:59]
commission to begin with and secondly
[8:01]
how you see it fitting in to the safety
[8:04]
element once we even get to that point.
[8:06]
Um, I think it's in my quick review, and
[8:10]
I haven't done a detailed review,
[8:11]
apparently duplicative, and for a town
[8:14]
that doesn't even have a five-year
[8:15]
budget, an awful lot of work. And I
[8:18]
worry, my final comment as a lawyer, I
[8:20]
worry about putting things on a piece of
[8:22]
paper that raises expectations. The
[8:24]
classic example is you say you're going
[8:26]
to replace the traffic light, you don't,
[8:27]
and there's an accident, you're a def.
[8:30]
So, I read this and I see a lot of
[8:32]
things, oh, we're going to do this. and
[8:34]
I I I I cringe. So, those are my my
[8:38]
questions.
[8:39]
>> Okay. And and I would refer you to the
[8:41]
process for maintaining the list. Um I
[8:44]
tried to clearly spell out how this list
[8:47]
was going to get maintained and sort of
[8:49]
what the purpose of it was.
[8:54]
» You did say it would be an adjunct to
[8:56]
the safety element. So, that was what's
[8:59]
basic,
[9:00]
>> right? And and I think it's meant to be,
[9:02]
you know, there's at our last in the
[9:04]
last draft, we got a lot of comments on
[9:06]
the safety element and the goal was not
[9:08]
all of those belong in the safety
[9:10]
element um in the opinion of staff, but
[9:13]
I Rebecca and I didn't want to lose
[9:15]
those. We wanted to make sure that those
[9:17]
kind of comments are still available for
[9:19]
people to review. So again, the goal of
[9:21]
the list in broad strokes is hopefully
[9:24]
and you know the council is going to
[9:25]
come up have to come up with this
[9:27]
policy, but the proposal was that
[9:29]
annually a subcommittee reviews this and
[9:32]
makes suggestions to the council for
[9:34]
things that should be budgeted and g and
[9:36]
basically given staff direction. And the
[9:38]
other use is that the committees when
[9:40]
they're trying to decide their
[9:41]
priorities for the next year could look
[9:43]
at this list and say, "Oh, this is
[9:45]
something that we want to take on." But
[9:47]
there's nothing on this list that's
[9:48]
meant to be a commitment on the town's
[9:51]
part. This is a laundry list, if you
[9:53]
will, of things that we might want to
[9:55]
work on.
[9:56]
>> But I still don't understand how that
[9:58]
Let's assume some year from now we have
[10:01]
a safety element and you're
[10:02]
independently out there running top
[10:05]
lines on items. How does that fit into
[10:09]
staff time implementing a safety element
[10:11]
that's required by state law and will at
[10:13]
that point have been adopted? I don't
[10:15]
understand where the rubber hits the
[10:17]
road on that intersection.
[10:19]
>> Well, the things that are on here tend
[10:21]
to be fairly detailed tasks and the
[10:24]
safety element tends to be fairly broad
[10:27]
and the goal was not to sort of reopen
[10:30]
the safety element on an annual basis.
[10:33]
The safety element's meant to be a
[10:34]
document that lasts kind of five years
[10:36]
to maybe even 10 years.
[10:41]
So again, it's just a tool and council
[10:43]
will decide on policy for you know
[10:46]
implementing or not. I mean the council
[10:48]
may decide not to do that.
[10:51]
Other clarifying questions.
[10:53]
>> Yeah, I have one.
[10:54]
>> Yeah.
[10:55]
>> Um respectfully like obviously this is a
[10:59]
extensive list
[11:02]
15ish pages.
[11:04]
Um can and as as I recall
[11:09]
the original directive
[11:12]
was to prepare a draft list and report
[11:16]
back.
[11:18]
So this is
[11:20]
>> this is the draft list,
[11:21]
>> right? And and like I said, because of
[11:23]
the time constraints of this meeting,
[11:26]
what's the reason that list is so long
[11:27]
right now is we attempted to take
[11:30]
everything every comment from the last
[11:33]
safety element draft that was made and
[11:35]
dump it into this list. Rebecca and I
[11:39]
plan to go back through this list, ddup
[11:41]
it, clean it up some before we bring a
[11:44]
real draft back to the council. So I
[11:47]
mean I I am concerned that it would then
[11:53]
further slow down our safety element
[11:56]
adoption.
[11:58]
I
[11:58]
>> I believe this is decoupled from the
[12:00]
safety. This is not the same process.
[12:03]
There's this not going to go into the
[12:04]
safety element. This is a list that we
[12:07]
maintain
[12:09]
with some policy behind it or not. I
[12:12]
mean again the c the council may decide
[12:14]
not to have a policy not maintain
[12:16]
but this is not the safety element. This
[12:18]
is not meant to replace the safety
[12:19]
element.
[12:20]
>> With all due respect you might want to
[12:21]
consider renaming it so that that's
[12:23]
clear.
[12:25]
>> Okay. So let's wait on comments. We're
[12:27]
getting any other clarifying questions.
[12:30]
Okay. So with that I'll open up to
[12:32]
public comment. Is there any public
[12:34]
comment Veronica online?
[12:38]
There is one raised hand online from MJ.
[12:47]
» Go ahead, MJ.
[12:48]
>> Yeah, thanks. Um, yeah, I had a few
[12:52]
questions. Um, first of all, when is the
[12:55]
safety element do?
[12:59]
» Okay, so right now we're talking about
[13:01]
the safety and resilience list, not the
[13:03]
safety. So, we will get to in the next
[13:05]
agenda item, the safety element.
[13:09]
Okay. But but the safety and resilience
[13:13]
list, you're saying it's going to be
[13:15]
like an addendum in the safety element?
[13:18]
>> No, I'm saying it's No, I'm saying it's
[13:20]
another list that the council still
[13:22]
needs to review and create a policy for.
[13:26]
>> Okay. Well, then so you only want
[13:28]
questions right now about the safety and
[13:31]
resilience list.
[13:33]
I'm really just looking for public
[13:35]
comment on the list and particularly the
[13:37]
sort of the concept of the list.
[13:40]
>> Okay. So, let me just ask this. I I've
[13:42]
seen earlier drafts of the list. This
[13:46]
table, this chart in here, is it the
[13:48]
same list is just formatted differently.
[13:53]
>> I'm not sure which
[13:55]
>> the last version I saw was the one you
[13:57]
guys passed around I think in March or
[14:00]
February or March or something. So it's
[14:04]
>> Yes. So it has a lot of the same things.
[14:07]
>> Okay. But I would still need to read
[14:09]
this whole thing to see how it differs.
[14:12]
>> Well, this if the council agrees on a
[14:15]
policy, this will be the list. There
[14:17]
won't be yet another list.
[14:21]
>> Yeah. No, I mean in reference to the
[14:23]
list that I originally saw. That's what
[14:25]
I'm asking. because you know the
[14:27]
wildfire committee based its whole goals
[14:30]
on the stuff that came out of that list.
[14:33]
I just want to know if this list has
[14:37]
>> been added to.
[14:41]
» Well, it's definitely been added to, but
[14:42]
I don't think in any way has
[14:45]
>> subtracted from what wildfire
[14:46]
preparedness is trying to do.
[14:48]
>> Yeah. No, it's not the subtractions I'm
[14:51]
worried about. Thank you.
[14:54]
>> Okay. Thank you,
[14:55]
>> Craig. I I had actually a question
[14:58]
before you went to public comment. So, I
[15:01]
>> can I finish public comment though since
[15:03]
I've opened it and I'll come back to
[15:04]
you.
[15:04]
>> Well, it's a question for for the
[15:08]
attorney. What is the right thing to do?
[15:10]
>> Okay.
[15:15]
» So, I I was in the process of looking at
[15:18]
my list of questions and then Craig went
[15:20]
to public comment. That's fine. But if I
[15:23]
now have questions, do I just hold it
[15:25]
till public comment's done? That's all.
[15:29]
>> I would say discretion of the mayor
[15:31]
whether to
[15:32]
>> I'll wait.
[15:32]
>> Yeah.
[15:33]
Just because I think we can wrap
[15:35]
up pretty quick. I'll go to you first.
[15:37]
>> Yeah. Okay.
[15:38]
>> Um, anybody else online?
[15:41]
>> Yes. Two more hands. The first one just
[15:45]
says Zoom user.
[15:51]
Welcome Zoom user.
[15:52]
>> Hi Dana Breen. Can you hear me? Is it
[15:55]
>> We We can hear you Dana. Yeah, welcome.
[15:58]
>> Um I I feel confused all of a sudden at
[16:01]
the beginning of this meeting. I mean
[16:03]
why is there a time con constraint on
[16:06]
this uh on this meeting? What what is
[16:10]
the the issue? So I mean I thought that
[16:13]
we were talking about the the changes to
[16:15]
the general plan. Um, anyway, I feel
[16:19]
confused about what the process is here.
[16:23]
>> And I also like to say because this is a
[16:26]
change to the general plan, I'm so
[16:28]
surprised that Ed Holland's committee,
[16:31]
all these other committees have have not
[16:33]
studied what came out. ASC didn't study
[16:37]
it. So, I I hope we have an opportunity.
[16:41]
I hope that there's going to be a lot of
[16:43]
time here for us to study this stuff.
[16:46]
Thank you.
[16:47]
>> Thank you, Dana. And again, I would
[16:49]
remind people that the safety and
[16:51]
resilience list is safety element, but
[16:54]
we we'll get to it. Um, okay. Any other
[16:56]
online?
[16:57]
>> Yes. From Christie.
[17:02]
» Go ahead, Christie. Welcome.
[17:04]
>> Thank you. I think what MJ was saying
[17:07]
earlier is of a concern. Anytime there's
[17:10]
changes to a previous document, the
[17:13]
public should see a red line of what was
[17:17]
added and what was deleted so we don't
[17:20]
have to compare them side by side. So
[17:24]
that's of concern
[17:26]
and uh
[17:29]
and I agree with that all committees
[17:32]
should uh get these things prior to
[17:37]
maybe you're trying to get in the first
[17:39]
read but we want the first read to be
[17:41]
our committees and to put have input and
[17:45]
then we want to look at the document and
[17:48]
then present it. So something is odd
[17:52]
with this process. I agree. Thank you.
[17:56]
>> Thank you.
[17:59]
» Already off schedule.
[18:01]
>> Yeah, I'm doing the best I can.
[18:03]
>> Understood.
[18:05]
>> Friendly.
[18:06]
>> Veronica, anybody else online?
[18:07]
>> Uh, no, that's all the comments.
[18:08]
>> Anybody in the schoolhouse? Rita,
[18:10]
please.
[18:16]
» Yes, I've used um project management in
[18:19]
the past. you know, the different uh
[18:21]
software where you are moving forward
[18:24]
with your project and then you use
[18:26]
different colors to show that you've
[18:29]
done progress. And a lot of these items
[18:32]
on here are in future tense. And
[18:37]
I know from attending many many meetings
[18:39]
that some of these things are in the
[18:42]
process or they've been done but it just
[18:45]
seems the way it's tensed that we don't
[18:48]
have anything going on in our beautiful
[18:50]
town and we we have to so um I just have
[18:55]
a concern about this particular uh
[18:58]
document and how it what it represents
[19:01]
you know for our town for somebody from
[19:03]
the outside looking in
[19:06]
and a lot of these things cost money
[19:09]
that we that we don't have, but they're
[19:12]
kind of done. So, it looks like we don't
[19:15]
have anything and we don't have money to
[19:17]
do these things.
[19:21]
That's my comment. Thank you.
[19:27]
All right. Anyone else in the
[19:28]
schoolhouse, please?
[19:31]
Nan
[19:38]
I see that.
[19:41]
>> Yeah. So we're talking about your safety
[19:43]
and resilience list which I take it is
[19:47]
the lowest level of detail sort of
[19:50]
project level which falls out from the
[19:53]
safety element which goes goals policies
[19:56]
and and then there's the no Linda says
[20:01]
no the the uh list of implementation
[20:05]
actions at the back of the safety
[20:07]
element
[20:09]
is still at a higher level than
[20:12]
the safety and resilience list. So I'm I
[20:15]
guess I'm confused between the
[20:16]
implementation actions in the safety
[20:18]
element and the safety and resilience
[20:21]
list items.
[20:26]
Okay. I mean I'm we're trying to do
[20:28]
comments and not I don't I'm trying to
[20:30]
be careful not to go too much into
[20:32]
answering questions, but one is meant to
[20:34]
be a general list of things that people
[20:36]
are interested in potentially doing. The
[20:38]
other is stuff that we intend to do as sort of policy. So they're different
[20:43]
in that way,
[20:47]
» meaning items that we can we think we
[20:49]
can actually accomplish in the next, you
[20:52]
know, discrete period of time rather
[20:54]
than things we think should happen in
[20:56]
some longer period of time or
[20:59]
>> um where are we out of our time or what?
[21:04]
>> That's our fine. Again, I'm we're
[21:06]
getting bit into back and forth which
[21:07]
I'd like to avoid because we're already
[21:09]
kind of over time on this item. So, um
[21:11]
but Nan, I'd be happy to talk to you
[21:12]
more a afterwards.
[21:15]
Okay. Um anybody else in the
[21:17]
schoolhouse?
[21:19]
All right. So, with that, I'm going to
[21:20]
close public comment. I'm going to come
[21:22]
back to Judith first.
[21:23]
>> Yeah. So my my question is a little more
[21:26]
procedural because
[21:29]
um and I I will have comments as well
[21:31]
but the question is more like this is a
[21:34]
list. Are we supposed to be saying where
[21:38]
we might have some concerns? Um, and
[21:42]
will that be con like considered in the
[21:45]
next draft or is it going to be assumed
[21:48]
that we're we're not commenting
[21:50]
substantively at all tonight and
[21:53]
therefore we're free to make any comment
[21:55]
at all when we next see it? So, I just
[21:57]
want to know what we're obligated to be
[21:59]
doing tonight versus if and when it
[22:02]
comes back. Um what because I I have
[22:07]
substantive questions and concerns but
[22:10]
they might be beside the point if we are
[22:12]
completely free to make any comments in
[22:15]
the next time it comes up
[22:17]
>> and there's you know to be clear I I
[22:19]
want there to be no implication that
[22:22]
there's you know a predisposed
[22:25]
assumption of acceptance coming out of
[22:28]
tonight.
[22:29]
>> That is correct. So there's you are
[22:31]
going to be completely free when the
[22:33]
council takes this up in the future to
[22:35]
talk about the policy and the list. Um
[22:38]
the only reason we brought this up
[22:40]
tonight was we were asked to bring it up
[22:42]
because there are things that aren't in
[22:44]
the safety element, but that people had
[22:46]
made comments in a previous one and we
[22:48]
wanted people to know that they weren't
[22:49]
lost, that that information wasn't gone.
[22:52]
>> That's sort of the safety and resilience
[22:54]
list was sort of part of that. But it's
[22:56]
going to come back to the council and
[22:57]
the council can decide that this list
[22:59]
shouldn't exist. That's fine as well. So
[23:02]
there there's nothing
[23:03]
>> be modified, right?
[23:04]
>> Well, I mean it could be modified. It
[23:05]
could be decided that we don't want to
[23:07]
do it at all. I mean the process has not
[23:09]
been decided. We were just saying look
[23:11]
here's the direction that the
[23:13]
subcommittee has been headed.
[23:15]
>> So that was it was just meant to be a
[23:17]
report out to say this is the direction
[23:19]
the subcommittee is headed.
[23:21]
Okay. Um yeah, please.
[23:24]
So is the main motivation for this list
[23:26]
to be separate from the safety element
[23:28]
itself the fact that the safety element
[23:30]
is maybe difficult to modify and not
[23:33]
modified very often or is it these are
[23:35]
things that didn't make it into the
[23:37]
safety element we're trying to keep
[23:39]
track of them so kind of yes to all the
[23:41]
above. So the safety element is
[23:43]
something that you don't want to keep
[23:44]
modifying the general plan if you don't
[23:46]
have to and it's an element of the
[23:47]
general plan. Um, and the list was meant
[23:49]
to be if a committee has something that
[23:52]
they think's important that they don't
[23:53]
want to get lost, we should be able to
[23:55]
put it on there, it's not a commitment
[23:57]
by the council or the town or the
[23:59]
committee, but it when we review it
[24:01]
annually, we should say, "Oh, I wonder
[24:03]
if we should start working on this now."
[24:05]
So, that was more what it was was just a
[24:07]
pl kind of a placeholder for ideas.
[24:11]
Okay,
[24:13]
other comments? been done.
[24:14]
>> I really want to be clear that this is
[24:17]
not part of the safety element.
[24:19]
>> It's not required by the state law to be
[24:21]
in the safety element. It has not been
[24:23]
reviewed or looked at by the planning
[24:26]
commission. We saw it just as soon as
[24:28]
you guys did. And um to kind of
[24:32]
correlate it to the safety element in my
[24:35]
mind, I guess the council can do what
[24:37]
they want to do, but it's not what the
[24:40]
law says. the element does have
[24:42]
implementation plans which can be laid
[24:45]
out on annual or weekly or monthly or
[24:48]
decadily uh manners. So I think it needs
[24:52]
to be really clear that this is
[24:53]
something from a subcommittee from the
[24:55]
town council and not to be confused with
[24:58]
the topic of tonight which is the safety
[25:01]
element.
[25:03]
>> Thank you. Other comments?
[25:06]
So let me I'll go on this side then I'll
[25:08]
come back to you guys. Go ahead.
[25:10]
>> Yeah. Um yes. Um thank you for
[25:13]
everything. And just to be clear, we did
[25:15]
kind of it was the questioning period
[25:18]
was a little bit unclear as well because
[25:20]
it was more of the um
[25:24]
like the process question instead of the
[25:26]
question on the documents. I feel like
[25:28]
so I will echo what chair brother said
[25:33]
um in terms of the safety element has
[25:36]
very mandated aspects that need to be
[25:39]
included
[25:41]
um and so like you know there's been a long time request to get
[25:50]
the safety element out the door and I
[25:52]
think it's great that we have this other
[25:54]
laundry list to consider but I do hope
[25:57]
that we concentrate on getting while all
[26:00]
of us are together and we've started
[26:01]
early. I do hope that we can get to the
[26:04]
safety elements so that we can make sure
[26:06]
that we consider that deeply. Thank you.
[26:09]
>> That's where we're headed. All right,
[26:11]
Mary.
[26:13]
>> Thank you. Uh I do really like the
[26:16]
concept of the safety and resilience
[26:18]
list uh and as being a living document
[26:21]
that actually all of us can look at see
[26:24]
where we what whether our concerns are
[26:27]
actually on there and uh and amplify
[26:30]
them if they need to be or elevate them
[26:32]
if they if it as the interest of the
[26:36]
community and it's possible. So I think
[26:39]
it's a great a great tool that you've
[26:41]
developed. Thank you very much. Uh and
[26:44]
it certainly makes me more feel more
[26:46]
comfortable moving ahead with the safety
[26:48]
element. Um the relationship between the
[26:51]
list and the safety element does need to
[26:54]
be clarified eventually but not tonight.
[26:57]
And I think they this is a separate uh
[27:00]
presentation and should remain so. So uh
[27:05]
I'm pleased with the direction that
[27:07]
you're going.
[27:08]
>> Okay. Thank you, Judy.
[27:11]
Well, if you're looking for comments,
[27:13]
um, like holistic comments, not line
[27:15]
item comments, um, I do echo some
[27:19]
concerns. I mean, obviously a lot of
[27:20]
work done. It's great to have a
[27:22]
repository of potential items to pick up
[27:26]
in the future. Um, but a lot of these
[27:30]
have significant cost implications for
[27:32]
the individuals and for the town. they
[27:35]
um it's unclear what the costbenefit
[27:38]
would be and some of these are policy
[27:42]
decisions for the council. So I do
[27:44]
anticipate a robust discussion when it
[27:47]
comes forward again and from a personal
[27:51]
point of view um I am retaining all
[27:54]
rights to make any comments in a future
[27:57]
meeting. Um but but do think that it's
[28:00]
helpful they have a repository um to to
[28:03]
frame up. Okay, thank you Karen.
[28:06]
>> Um I feel a little out of place speaking
[28:08]
to this because I'm not a council
[28:10]
member, but I do think it needs a lot of
[28:12]
cleanup. Um there a lot of these goals
[28:14]
are extremely vague and about
[28:16]
communication and I'm not sure when
[28:18]
you'd ever know it was done,
[28:19]
>> right?
[28:19]
>> Or who would do it and I found 44 of
[28:22]
those and so um I would suggest a you
[28:25]
know a second draft.
[28:27]
>> Yeah. Did and which is definitely going
[28:28]
to be in progress. So Bonnie, any con?
[28:31]
Um yeah, I guess I I I feel like it that
[28:35]
the list is serving too many functions.
[28:38]
Um and it I think it's confusing. Uh it makes it confusing of what exactly
[28:43]
it's a list of. Um and yeah, it just is
[28:48]
very long. I I realize there's some
[28:50]
redundancy, but even after eliminating
[28:52]
it, just feel like it's going to be very
[28:54]
long. Like if we had a list of, you
[28:56]
know, these are the 10 20 things like
[28:58]
we're going to work on this year.
[29:01]
I guess it's not trying to serve it
[29:03]
seems like it's partially serving that
[29:04]
but then serving other things maybe
[29:07]
>> yeah it's not meant to serve the purpose
[29:08]
of this is what we're working that's not
[29:10]
the intent it was the intent was to
[29:13]
gather people's requests and that
[29:16]
annually those requests would be look at
[29:18]
decide if we would start working on so I think it's sort of a step back from
[29:24]
things that we're actually working on I
[29:26]
mean unless a committee or the council
[29:28]
decides to,
[29:31]
you know, act act on one of these. It
[29:33]
just sits on the list. That's its that's
[29:35]
its home. That's where it's going to
[29:37]
live. It really is just a repository. I
[29:39]
think that's a good description of it
[29:41]
from Judith. I mean, that's it. It's
[29:43]
just a repository. It it has no
[29:44]
actionable unless somebody takes one of
[29:47]
those things and turns it into an action
[29:49]
item, it's it's just a repository.
[29:50]
>> Okay. If it's clearly I I guess maybe my comment is maybe it could be
[29:55]
more clear that that's what it
[29:58]
>> Okay, great. Thank you, Bo.
[30:02]
>> I guess I'd echo uh Karen's point. I
[30:04]
think it's a good idea to have this list
[30:06]
and have the repository, there is
[30:10]
obvious overlap with the safety
[30:12]
elements. It's not clear which are
[30:14]
overlaps and which are not overlaps. And
[30:17]
I think as you work through this with a
[30:18]
draft and get a key and a glossery and
[30:21]
things are sorted out, then I think it
[30:23]
could be a very useful list. It's
[30:25]
obviously confusing today. Yeah,
[30:28]
appreciate. Okay. All right. So, with
[30:31]
that, let me
[30:32]
>> Can I make can I make one comment?
[30:35]
>> Sure.
[30:37]
Oh, I'm sorry, Nicholas. Um, first of
[30:38]
all, welcome.
[30:41]
>> Um, so can I go to Nicholas?
[30:43]
>> Go to Nicholas.
[30:44]
>> You and I would ask it's already
[30:46]
>> discussing this.
[30:47]
>> We're already 15 minutes over. So, if we
[30:50]
can keep our comments super short at
[30:51]
this point, um, because this was only
[30:53]
meant to say this is a thing we're going
[30:55]
to do in the future, not something to go
[30:57]
into detail. So, but Nicholas, please
[30:59]
make your make your comment.
[31:00]
>> Cool. Uh, thanks so much and I apologize
[31:03]
for joining you uh late. Let me
[31:06]
recognize that. Um, I also appreciate
[31:09]
the amount of work that went into
[31:11]
creating uh the list. I found it uh
[31:13]
confusing. of the relationship of the
[31:16]
list to the safety element uh itself. Um
[31:23]
I think that I share many of the the
[31:27]
concerns that were stated. I'm not going
[31:29]
to repeat them in the interest of time,
[31:31]
but
[31:33]
I don't think it is an item I'm hearing
[31:37]
that it's not an item to be voted on,
[31:40]
nor is it an item that
[31:47]
represents an action plan,
[31:50]
but rather it's a you know, we all have
[31:54]
this document
[31:57]
in your desk drawer. Got a desk drawer
[32:01]
that it's like of the things that you do
[32:03]
if you actually find some money and you
[32:06]
got some time to do it. And I looked at
[32:08]
that and I think well maybe this is that
[32:10]
and is not entirely baked but they're
[32:13]
things that you might think about doing
[32:15]
at some point in time and clarifying
[32:19]
its status at that level. Not that we're
[32:22]
gonna do it, but the interesting things
[32:25]
to think about maybe doing at some point
[32:29]
would be
[32:31]
uh the way that I would think about it
[32:35]
and feel comfortable
[32:37]
uh with it, you know, maybe go there for
[32:41]
good ideas and build it out, but you
[32:45]
know, it's both unclear what it is and
[32:49]
whether it should be done and how much
[32:53]
money it would cost to do it and what
[32:56]
the bang for the buck is. But, you know,
[32:58]
there's like nothing obviously wrong
[33:01]
with it, but it just needs it needs it
[33:05]
needs to be clarified what it is and
[33:07]
where it is and how it might be used.
[33:11]
That's what I've got. Thank you.
[33:12]
>> Thank you, Mary.
[33:15]
My comment was going to be that uh it
[33:17]
answered one of the things that I have
[33:19]
been bothered by this whole process the
[33:21]
safety element process because yes there
[33:24]
are people who haven't been able to
[33:25]
speak to the safety element who we are
[33:28]
used to hearing from the safety element
[33:31]
about the safety element like bicycle
[33:34]
pedestrian traffic committee like the uh
[33:38]
fire department etc. They they this is
[33:42]
really a process that's been going on
[33:43]
for five years. This is the same old
[33:46]
process. We've all commented and commented and commented.
[33:50]
We need to get a safety element done. Uh
[33:53]
and this repository is the opportunity
[33:55]
to capture all the work of the last five
[33:57]
years that isn't able necessarily to be
[34:00]
incorporated in the safety element.
[34:03]
>> Okay. Thank you. All right. So, I'd like
[34:05]
to close 4A and move on to 4B, which is
[34:10]
receive an update and provide direction
[34:11]
on the 2026 draft safety element. So,
[34:14]
Sarah, believe you got the staff report.
[34:17]
Thank you. Good evening, town council
[34:19]
and planning commission. I'm Sarah
[34:20]
Cororus, the planning director with Town
[34:22]
of Cortto Valley, and I'm joined here
[34:24]
tonight with Aaron Fannensteel from
[34:26]
Atlas Planning. So, we're very excited
[34:27]
to be here tonight for a joint and also
[34:30]
very unique study session and very happy
[34:32]
to have both groups here tonight for
[34:34]
very important discussion around the
[34:36]
2026 draft safety elements. So, we
[34:40]
already kind of got a quick update from
[34:42]
the town council subcommittee. We have a
[34:45]
short presentation we'd like to walk
[34:47]
through to give an overview of the
[34:48]
progress we've made so far. There is
[34:50]
opportunity for public comment after the
[34:52]
presentation and then the rest of the
[34:54]
time will be left for discussion
[34:56]
including questions and comments from
[34:58]
both commission and counselors and we'll
[35:00]
be here for that. So at this point I'm
[35:01]
going to pass it off to Erin.
[35:05]
» Thank you Sarah. Next slide please. So
[35:08]
let's just briefly touch on how we got
[35:10]
here. Uh as uh I believe is a council
[35:14]
member Hufty uh how you indicated we've
[35:17]
been doing this for five years. Um I
[35:19]
have been a part of this process for a
[35:21]
vast majority of that. Uh right around
[35:24]
the end of 2023
[35:26]
this project kind of took a hold but
[35:29]
prior to that a lot of work was done. We
[35:31]
had a lot of studies. We wrote a couple
[35:33]
of drafts. Uh there was a lot of
[35:35]
feedback and and input. Uh and then
[35:37]
things went on holds. Um staff around me
[35:40]
has changed. I haven't changed that much
[35:43]
since we started this process. A little
[35:46]
grayer though. Thank you. Uh, and but
[35:49]
we're back. Um, and this was really
[35:50]
again prioritized by the council that
[35:52]
you wanted to get this back on track.
[35:54]
And I'm sure it wasn't just the council.
[35:56]
I'm sure a lot of people want back on
[35:58]
track. So, that's what brings us here
[36:00]
today. Uh, and the draft that we
[36:03]
provided uh is really just that. It's a
[36:05]
draft. Our uh proposed timeline at this
[36:08]
point is the rest of this month is open
[36:11]
for as much feedback as possible. So,
[36:14]
tonight is not the only night that we
[36:16]
get feedback. We want to make sure you
[36:18]
have plenty of time. We wanted to also
[36:20]
set the tone for what it is that would
[36:23]
help us the most in getting that
[36:25]
feedback so that way we can help focus
[36:27]
your efforts. We know you're busy. Uh
[36:29]
both Sarah and I have sat on the other
[36:31]
side of the DEAS as planning
[36:33]
commissioners. We understand what that
[36:35]
job looks like. Um we are not crazy
[36:37]
enough to actually sit on that side as
[36:38]
council members. No offense, but you
[36:41]
know, we're uh we understand uh what you
[36:44]
have as far as constraints. So this is
[36:46]
the the time frame that we've laid out
[36:49]
um with the intent that uh by July we'll
[36:52]
start looking and evaluating at all the
[36:54]
feedback that we received. We've already
[36:55]
started looking at a lot of what's
[36:57]
already come in. Uh working closely with
[36:59]
a lot of other external um agencies that
[37:01]
should be reviewing this like California
[37:03]
Office of Emergency Services, Califire,
[37:06]
and the uh California Geological Survey
[37:09]
uh with the hope that we could be back
[37:11]
uh sometime in September and October for
[37:13]
final review and approval by the
[37:15]
commission and council.
[37:17]
So, let me just briefly say what a
[37:18]
safety element is not. So, this is not a
[37:21]
document that focuses on immediate
[37:22]
actions. Yes. Oh, next slide. I'm
[37:25]
apologize.
[37:26]
I'm doing it on my my computer.
[37:29]
Um, so this is not a document that
[37:31]
focuses on immediate uh safety element.
[37:34]
Um, if we go to the next slide, um, is it's a mandatory chapter of your
[37:39]
general plan. There are seven required
[37:42]
chapters as you can see on the screen
[37:44]
and then there's two additional required
[37:46]
chapters depending on the conditions
[37:48]
within your community uh, whether or not
[37:50]
you would qualify. Um, these chapters
[37:54]
focus on long-term actions that can help
[37:56]
address town safety needs. Um, there are
[37:59]
required pieces to it like background
[38:00]
information, maps, and then policies and
[38:03]
actions. And this chapter now requires a
[38:06]
little bit more update than some of the
[38:08]
others because of the legislative
[38:11]
mandates that have come down. Now, if
[38:12]
you go to the next slide or just click
[38:14]
the next button, what you'll see is you
[38:17]
have all of those chapters and then
[38:19]
some. So the ones highlighted in pink
[38:20]
are the additional elements that you
[38:23]
have created as part of your general
[38:24]
plan. That is perfectly acceptable. Um
[38:27]
you have to have the bare minimum which
[38:29]
is those seven at least. Um but you have
[38:31]
the freedom to make as many elements as
[38:33]
you want. Don't often recommend that you
[38:36]
go that route. Um but every community
[38:39]
can do you know address the needs of
[38:41]
their community whatever way they see
[38:42]
fit. And this is how it um came out when
[38:46]
you put your last general plan together.
[38:49]
Next slide.
[38:51]
So, let's talk a little about what does
[38:53]
a safety element do? This is what the
[38:55]
government code says that you need to
[38:57]
have a plan that protects the community
[38:59]
from unreasonable risks associated with
[39:01]
seismically induced surface rupture,
[39:03]
ground shaking, flooding, tsunami, slope
[39:05]
instability, wildfire, etc. The four on
[39:09]
the bottom, those are not specific
[39:11]
hazards as much as conditions that you
[39:13]
also need to help address. The
[39:15]
interesting thing about that is three
[39:17]
out of those four have actually been
[39:18]
superseded by new legislation and new
[39:21]
mandates that have come down. If you go
[39:23]
to the next slide,
[39:25]
why are we updating the element? one
[39:28]
because you're now required to um when I
[39:30]
say you're required, there is no
[39:33]
statutory
[39:34]
um penalty in the way that you have
[39:38]
penalties for your housing element not
[39:40]
being up to date, but there is
[39:42]
legislation that indicates by certain
[39:45]
dates and through certain triggers, you
[39:47]
need to update your safety element.
[39:49]
In 20 uh 2006, AB2140 went into effect.
[39:54]
This is a voluntary item, but it's a
[39:56]
very very large um it has a very large
[40:01]
financial consequence if you don't do
[40:02]
it. We have opted to integrate that into
[40:05]
your safety element.
[40:07]
Uh in 2014, wildfire hazards were
[40:11]
required to be addressed. This is when
[40:12]
the wildfire um hazard maps basically
[40:16]
started to trigger CalFire review of
[40:19]
safety elements in 2017. Climate
[40:22]
adaptation and how the hazards within
[40:24]
your community may be impacted by
[40:26]
climate change were required to be
[40:28]
addressed. That's SB 379.
[40:31]
2018,
[40:32]
this is when the legislature connected
[40:35]
housing elements and safety elements
[40:36]
together.
[40:38]
2019,
[40:40]
2021, and 2022 is when evacuation
[40:43]
analysis requirements went into effect.
[40:45]
SB99 focuses on the single ingress,
[40:48]
egress, and constrained parcels. AB747
[40:51]
and 1409 looks at an evacuation
[40:54]
assessment and capacity, safety, and
[40:56]
viability of your circulation network.
[40:59]
And then in 2028 on January 1st, AB2684
[41:03]
goes into effect, meaning you have to
[41:05]
address extreme heat as part of your
[41:06]
safety. So, this is the main culprit as
[41:10]
to why we have been trying to update the
[41:12]
safety element and we're here before you
[41:14]
working with town staff as well as all
[41:17]
of the appointed and elected officials
[41:19]
to make sure that the safety element
[41:22]
meets those statutory requirements. Next
[41:24]
slide.
[41:26]
So, your element as proposed really has
[41:29]
three main
[41:31]
sections. The safety element overview is
[41:34]
really about your purpose, the
[41:35]
relationship to other elements uh and
[41:37]
plans within your uh general plan and um
[41:41]
some other plans that you may have uh
[41:43]
created um as well as how the plan the
[41:46]
element is organized and the focus for
[41:49]
the community. The next main section are
[41:52]
hazard evaluations. Basically, what are
[41:54]
the hazards of concern? Again, looking
[41:57]
through the the lens of what does the
[41:59]
government code require? Um, there are
[42:02]
safety elements out there that you could
[42:03]
address every single hazard you're most
[42:05]
worried about. I will tell you the vast
[42:07]
majority of those do not protect a
[42:10]
community any better than an element
[42:12]
that is meeting the statutory
[42:13]
requirements. Uh and then safety goals
[42:16]
and policies, which is really the
[42:18]
toolbox that town staff will be relying
[42:22]
on and commission and council will be
[42:24]
using to ensure that projects that are
[42:28]
being proposed meet the standards that
[42:30]
you have set as a community. Next slide.
[42:35]
So what we need from you,
[42:38]
this is something that we um we we've
[42:40]
discussed with staff, you know, here
[42:43]
tonight. we're a and moving throughout
[42:45]
the rest of this month, it's really
[42:46]
about receiving that feedback from the
[42:48]
public, from appointed elected
[42:49]
officials, from interested parties. Um,
[42:52]
we want to then identify the changes
[42:54]
that are necessary to meet statutory
[42:56]
requirements. Um, we also anticipate
[42:59]
there will be changes that we may need
[43:02]
additional direction from council on uh
[43:05]
to that are beyond those required
[43:07]
changes. um and then ultimately get this
[43:09]
plan and this element ready uh to have
[43:12]
it reviewed by CalFire as well as other
[43:14]
agencies. So we provided this you know
[43:18]
how do how should we focus if you look
[43:21]
at those three sections when we look at
[43:23]
that first component of the safety
[43:25]
element have we missed official plans or
[43:28]
references to relevant documents that
[43:29]
you would be concerned about or want to
[43:31]
get connected to the element we've also
[43:33]
seen a lot of feedback already that
[43:35]
there might be too much detail and we're
[43:37]
happy to go ahead and start to minimize
[43:40]
some of that detail there are ways that
[43:41]
we can that um so we really want to make
[43:45]
sure it structurally works for the
[43:47]
community. We went a little bit more
[43:50]
versus less because sometimes
[43:52]
communities like to see a lot of the
[43:54]
detail. If yours doesn't, perfectly
[43:56]
acceptable. At the end of the day, I
[43:58]
walk out the door and you're stuck with
[44:00]
the document. I don't want you to be
[44:01]
stuck with something that you're not
[44:02]
happy with. When it comes to the hazard
[44:04]
evaluations, we need to know if we've
[44:06]
used incorrect information from official
[44:09]
and reputable sources. So, my friend
[44:11]
Doug said something happened two years
[44:12]
ago is not a reputable source.
[44:14]
unfortunately, unless Doug actually has
[44:17]
a scientific study or some sort of
[44:19]
analysis that they've done that has been
[44:21]
vetted by the town or by another uh
[44:23]
government agency. So, we want to make
[44:25]
sure that what we're relying on is good
[44:27]
quality information. If there's
[44:29]
something we have missed, we want to
[44:31]
make sure that it can be identified.
[44:33]
Part of the reason why we are going to
[44:34]
send this out to other agencies for
[44:37]
review is so that they can also help us
[44:39]
with that. Uh and then the goals and the
[44:42]
policy section is really about is there
[44:45]
a policy or action that's missing or uh
[44:48]
one that causes concern especially if
[44:51]
there's one that's causing concern that
[44:52]
may cost time, money, staff hours, and
[44:56]
you want to make sure that this is the
[44:58]
right decision for community. So those
[45:00]
are the types of ways that your feedback
[45:03]
will help us the most. Next slide.
[45:08]
So, the next steps for tonight uh was to
[45:11]
open things up for public comment. I
[45:12]
know that was part of the agenda and
[45:14]
then bring this back down to uh both
[45:16]
council and commission for questions and
[45:18]
discussion. Uh at this point, we are
[45:21]
done with the presentations. Happy to
[45:23]
answer any clarifying questions uh and
[45:26]
uh up to the mayor on how you would like
[45:29]
to proceed with public comment from
[45:31]
here.
[45:34]
>> Thank you, Aaron. So, I'd just like to
[45:36]
start with clarifying questions. Um, so
[45:38]
are there any clarifying questions on
[45:40]
the presentation? And we'll get to a
[45:42]
more wholesome discussion. Doug, do you
[45:44]
have anything? Not any. So, just sort of
[45:49]
shake your head if you don't have
[45:50]
anything and we can move on. But Karen,
[45:52]
>> I have a lot of clarifying questions,
[45:54]
but it might be more useful to make them
[45:56]
as comments.
[45:57]
>> Okay, great. Then why don't we wait?
[46:00]
>> Um, what is LHMP section 2140? said it
[46:04]
was a big deal and I don't know what it
[46:07]
is.
[46:07]
>> Apologies. Uh do you need me to go back
[46:10]
to the slide or is it okay?
[46:11]
>> Just tell me.
[46:12]
>> The local hazard mitigation plan uh is a
[46:15]
voluntary document that the city has
[46:18]
adopted. You've actually adopted the
[46:21]
annex to the multi-jurisdictional hazard
[46:23]
mitigation plan that San Monteo County
[46:25]
prepared. So, Sonteo County and a bunch
[46:28]
of the participating uh cities and towns
[46:31]
in the county all went in together and
[46:34]
you now have one of those. We call it an
[46:36]
LHMP, but in your case it's actually an
[46:38]
MJHP. That's the acronym that
[46:40]
>> Oh, that was referenced in the document.
[46:43]
Okay. Same thing. Um, for years we went
[46:47]
back and forth on fire maps. Which fire
[46:49]
map was actually used? What was the
[46:51]
source of it? the latest fire hazard uh
[46:55]
severity zone map that was produced by
[46:57]
CalFire and release.
[46:59]
>> Okay.
[47:00]
>> Um
[47:03]
now when you ask us what for the
[47:06]
background what might be missing I don't
[47:09]
feel like I have any point of reference
[47:11]
to make any comments. So how would you
[47:14]
suggest we react based on an inability
[47:18]
to understand what we don't know?
[47:20]
So I think the biggest thing that I
[47:24]
would suggest if you don't if you feel
[47:26]
like you don't know if you read that
[47:28]
section and you feel like it makes sense
[47:30]
then that's perfect. If you feel like
[47:33]
I'm confused that means that if you're
[47:35]
confused and you sit behind the deas
[47:37]
people in
[47:38]
>> will be confused. If you can highlight
[47:40]
that we're more than happy to make sure
[47:42]
that we can deconlict any of that
[47:45]
confusion. Yeah, I mean this and my last
[47:48]
couple of clarifying questions um
[47:51]
derived from that which is
[47:54]
there's no time for us to see it before
[47:57]
it goes to the state. You're going to
[47:59]
take all of our comments. There'll be a
[48:01]
lot of comments we can make, but there
[48:04]
is not another goaround so that we can
[48:06]
double check there's nothing that's
[48:09]
obviously missing before it gets
[48:10]
submitted to the state. If I understand
[48:12]
that correctly and that's what your
[48:14]
slide said then
[48:17]
um what is your experience on backing up
[48:21]
like if once it's submitted to the state
[48:24]
and all these other authorities if we
[48:27]
say the cost benefit of that isn't
[48:30]
reachable for us.
[48:33]
Are we locked and loaded? Because
[48:34]
that'll help frame the comments you hear
[48:36]
tonight. like if we have to if we're not
[48:39]
sure air on the side of get it out and
[48:42]
we can add later because there's a lot
[48:44]
in here that I see that I'm
[48:46]
uncomfortable with. So how do how do you
[48:49]
suggest we frame that discussion?
[48:54]
» Uh as I think I was explaining this to
[48:56]
Sarah earlier today as well. Um,
[48:59]
we have gone through this process with
[49:02]
CalFire on three Sanato County elements
[49:06]
that are actually going to the board of
[49:07]
forestry next week. Uh, and so we're
[49:12]
relying on a lot of the work that went
[49:14]
into those to inform what
[49:18]
recommendations we're providing to
[49:20]
Portolo Valley as well. Uh the challenge
[49:23]
you're going to run into is uh you're
[49:25]
right as you start to review this if you
[49:27]
are concerned um then how do we uh
[49:32]
rectify that concern? The proposed
[49:35]
schedule that we have we believe has
[49:38]
enough time in it to to accommodate some
[49:40]
of that. But again that was staff's
[49:43]
proposed schedule. That doesn't
[49:44]
necessarily mean that we can't modify
[49:47]
the schedule to accommodate some of the
[49:49]
concerns of council and commission.
[49:52]
>> Judith, may I ask a clarifying question
[49:54]
on your question and answer? Uh were you
[49:56]
talking about that other little substudy
[49:59]
that you were asking about or the
[50:00]
element is because the ending is the
[50:03]
element is going to be rewritten and is
[50:05]
coming back to the
[50:07]
>> not before it goes to the state
[50:09]
>> before it goes to the state
[50:10]
>> or the authorities that review it and
[50:13]
inform and then it comes back. It will
[50:15]
come back is my understanding but
[50:18]
>> if it goes out beyond
[50:20]
valley in my in my view we're locked and
[50:24]
loaded. you cannot back up. If you back
[50:26]
up at that point, then we're against
[50:28]
safety. So, I want to understand exactly
[50:31]
how to frame this out if I have concerns
[50:34]
about the cost benefit of something.
[50:37]
Should I advocate tonight to take it out
[50:39]
and we can evaluate it and add it later
[50:42]
on the theory that they'll be happier if
[50:44]
we add something later or you know what
[50:48]
is practical?
[50:53]
Uh, did you want me to to to address
[50:55]
that now? Because I know it it sounds
[50:57]
>> it's a study session. So, I don't
[50:59]
understand how you go from a study
[51:01]
session to submitting something without
[51:03]
coming back to your a
[51:07]
Judith, but I'm trying to understand the
[51:10]
same thing you're trying to
[51:11]
>> Yeah. I mean, we're aligned on the
[51:12]
question.
[51:15]
So, I'll reference a little bit where
[51:17]
back in fall of 2025, there's direction
[51:19]
from town council including budget and
[51:21]
funding and ultimately a contract with
[51:23]
consultants to work on a very specific
[51:26]
scope to move the safety element through
[51:28]
adoption. So, within that scope of work,
[51:31]
it was identified to do this study
[51:32]
session to hear feedback and to have
[51:34]
this joint study session to address
[51:36]
comments. However, if there are comments
[51:40]
or things that we've received that might
[51:42]
trigger more substantial changes, then
[51:45]
there could be an opportunity, but it
[51:47]
would change the timeline as well as the
[51:50]
budget and scope of the project. If we
[51:52]
find that there are more significant
[51:54]
revisions, then there's an opportunity
[51:56]
to do another public review draft. So,
[51:58]
that is that was written in the scope of
[52:00]
depending on how conversations happen. I
[52:03]
think there is an opportunity to still
[52:04]
potentially come to planning commission
[52:06]
during this draft during that time
[52:08]
period of uh external agency review
[52:11]
where if there's other feedback that we
[52:13]
can get before and then before it comes
[52:15]
through in with uh through the adoption
[52:18]
process. But the idea too as well as
[52:21]
going back to the timeline is that this
[52:22]
has been happening since 2021 and that
[52:25]
the plan you see before you addresses
[52:27]
all the previous comments that we have
[52:29]
received. ones that aren't in the plan
[52:31]
may have ended up on the safety and
[52:32]
resilience list, but the ones that
[52:34]
should be in the strappy safety element
[52:36]
have been addressed and are there. So,
[52:38]
this plan building on the previous
[52:39]
version, building on previous comments
[52:41]
and feedback gotten and is the best kind
[52:43]
of approach that we're putting forward
[52:45]
to you guys for feedback.
[52:47]
>> Yeah. And please don't take my questions
[52:49]
as criticism. They're really not
[52:50]
intended. I have to do my job. You've
[52:52]
done yours and you've done it well, as
[52:54]
far as I can tell. So, I want to be very
[52:56]
clear on that. Um, but you didn't answer
[52:59]
my question, which is if I if I want to
[53:03]
propose to take something out or like
[53:06]
what is the best use of time for me to
[53:09]
do tonight?
[53:10]
>> For tonight, I think if you have
[53:12]
specific comments or concerns about like
[53:15]
a policy or an action, let's I have
[53:18]
flagged those.
[53:18]
>> Okay. Um, and even if it's not I want to
[53:21]
dive into it, it's these are the ones
[53:23]
that I'm most concerned about. Then if
[53:26]
you want to follow up with here are some
[53:27]
of the specifics regarding those
[53:29]
concerns, that might be the most
[53:31]
efficient use of everyone's time.
[53:33]
>> Thank you.
[53:33]
>> Yeah,
[53:36]
Judith Mary clarifying questions.
[53:39]
>> Yes. Uh I I specifically wanted to ask
[53:43]
about uh fire following um following
[53:47]
earthquake and why that shouldn't be
[53:49]
presented as a separate hazard as being
[53:53]
unique to Porto Valley, not unique, but
[53:56]
our greatest hazard and that it should
[54:00]
be a driving force in our safety
[54:03]
element, not just a suggestion maybe on
[54:06]
a on an on a that adjunctive list.
[54:15]
» Well, I can't speak to what what it may
[54:17]
be on any other list because I again I
[54:20]
just want to also clarify too we have
[54:21]
not been part of the safety.
[54:23]
>> Right. No, I I'm specifically asking uh
[54:25]
my question is how much trouble is it to
[54:28]
add another section because we have two
[54:31]
kinds of fire. We have urban and we have
[54:34]
wildfire. And we have another kind that
[54:38]
has to do with earthquake that we all
[54:41]
know that that you talk about those
[54:43]
hazards, but no nowhere does it say
[54:45]
specifically what we do about when we
[54:48]
have a big earthquake and nobody knows
[54:50]
what's going to happen next. So oftent
[54:53]
times what we try to do um in all types
[54:57]
of hazards planning is
[55:01]
don't propose going down rabbit holes of
[55:04]
the whatifs on top of each other. So
[55:07]
when we talk about a hazard we try to
[55:10]
break it down to its full component. We
[55:12]
know that fire is a big concern. We want
[55:15]
to make sure we can address fire. We
[55:17]
also know that earthquake is a big
[55:19]
concern. It's very very logical that the
[55:21]
two of them together are an even bigger
[55:23]
concern. And I think we can recognize
[55:25]
that. What I'm uh what I caution a lot
[55:28]
of communities is for them to say, well,
[55:31]
I'm really worried about a traffic
[55:33]
accident that turns into a hazardous
[55:34]
material spill that turns into
[55:36]
evacuation, right? And so what we want
[55:38]
to do is we want to break our elements
[55:40]
and and the the components of our
[55:42]
hazards down to their kind of core
[55:44]
components. So that way you can easily
[55:47]
add them up as you're going through the
[55:50]
emergency management planning process.
[55:52]
Because what's best suited for the fire
[55:56]
after an earthquake hazard is for you to
[55:59]
actually have um an annex to your
[56:02]
emergency operations plan that talks
[56:04]
about after an earthquake, what are we
[56:07]
doing specifically as an organization.
[56:10]
We can definitely put a policy or two
[56:12]
in, but you already should have the
[56:14]
building blocks with the earthquake and
[56:16]
with the fire policies. And if we miss
[56:18]
something that you're concerned about
[56:19]
from an earthquake and a fire
[56:20]
perspective,
[56:21]
>> I don't think you're answering my
[56:22]
question.
[56:23]
>> Um, okay. So then,
[56:24]
>> how much trouble would it be to add that
[56:27]
element?
[56:27]
>> I I've already answered that question.
[56:29]
It's not difficult to add more
[56:31]
information or context about that, but
[56:34]
trying to create a whole entire hazards
[56:36]
discussion on that specific thing, I
[56:38]
would not recommend.
[56:40]
So adding a discussion under earthquake
[56:43]
that we have to be concerned about fire
[56:45]
after earthquake is something that we
[56:48]
can add to the element if you want to
[56:50]
also identify in the fire section. One
[56:53]
of the largest uh vulnerabilities for
[56:57]
fire is fire occurring after an
[57:00]
earthquake. We can definitely add that
[57:01]
to the if you want to create a whole
[57:03]
entire new section. That's probably a
[57:05]
little bit more work because now we're
[57:07]
getting into that scenario planning that
[57:10]
safety elements were never designed to
[57:12]
do.
[57:12]
>> Thank you.
[57:13]
>> Great. So, I'd like to remind people
[57:15]
it's six almost six o'clock. Let's try
[57:17]
to keep this section just to clarifying
[57:18]
questions. I feel like we're starting to
[57:20]
dive into kind of process. So, if we
[57:22]
just keep it to questions about the
[57:24]
presentation, we're going to come back.
[57:26]
You can still ask questions. This is the
[57:27]
last chance to ask questions, but let's
[57:30]
not sort of use all of this time up. So,
[57:33]
um, Lind, did you have any clarifying
[57:34]
questions?
[57:34]
>> I have a clarifying question. I have
[57:36]
oodles of comments. So, like you, I'm
[57:37]
anxious to get to that, but you made a
[57:40]
comment to the effect that this is not
[57:42]
an action document. How do you read the
[57:46]
state code that requires us to put
[57:48]
implementation measures?
[57:50]
>> Those are actions. Those are specific
[57:52]
actions.
[57:53]
>> Yeah. implementation measure or actions
[57:55]
but that's not an action that you can do
[57:57]
tomorrow in some like putting a padlock
[58:00]
on a fence and making sure that that
[58:02]
gate cannot open or close I can do that
[58:04]
tomorrow and somebody is a little bit
[58:06]
safer the implementation actions in a
[58:08]
general plan were never designed to be
[58:10]
something that you can take on tomorrow
[58:12]
check it off and and move on because
[58:14]
we're talking about larger systemic
[58:17]
issues that you have as a community
[58:19]
understanding your hazards and then
[58:20]
understanding how do you solve the
[58:22]
problem
[58:22]
>> associ associated with those hazards. I
[58:24]
understand but I think that's a much
[58:26]
different thing than what you said to
[58:28]
say that this is not an action enforcing
[58:30]
document because those implementation
[58:32]
measures are necessary
[58:34]
>> of locations and those are specific
[58:36]
actions
[58:37]
>> put the implementation actions in I
[58:39]
think maybe I misspoke and what I was
[58:42]
trying to but this is not immediate
[58:45]
action it's not something that happens
[58:47]
immediately it will take time
[58:49]
>> well no planning general plan element
[58:53]
happens immediately. So that's why it
[58:55]
was particularly disturbing. Thank you.
[58:57]
That's my only comment.
[58:58]
>> Thank you, Ellen.
[59:01]
>> Great. Thank you.
[59:03]
>> I do have a couple of questions. Um for
[59:06]
those folks who, you know, who are super
[59:09]
busy. Um, I didn't see an executive
[59:13]
summary type uh
[59:17]
situation in the front or any type of
[59:20]
uh, you know, quick and dirty
[59:24]
thing, you know, something that people
[59:25]
could read in their three minutes
[59:28]
situation.
[59:29]
>> Most of the time, general planning
[59:31]
elements do not have.
[59:33]
>> Okay, that was what I wanted to know.
[59:36]
Um, thank you. Next question. In terms
[59:39]
um of I don't about the impact of sea
[59:43]
level rise. Um I don't see anything in
[59:46]
here about our wastewater infrastructure
[59:48]
that is on the San Francisco Bay that's
[59:50]
cited in the San Monteo County sea level
[59:53]
rise vulnerability assessment of 2018.
[59:56]
The Silicon It's the Silicon Valley
[59:58]
clean water wastewater treatment plant.
[1:00:00]
Mhm.
[1:00:01]
>> Is was that because it's not in the town
[1:00:04]
boundaries? Like
[1:00:06]
>> so oftentimes what we really are
[1:00:08]
balancing is what do you have control
[1:00:10]
over versus what you don't have control
[1:00:12]
over. But I think we reference that sea
[1:00:14]
level rise is still a concern because of
[1:00:17]
infrastructure that the town relies on
[1:00:19]
outside. So I think that's a a great
[1:00:21]
thing you could add.
[1:00:22]
>> Great. Thank you. Um, and also just to
[1:00:26]
be clear about council member Hefty or
[1:00:28]
excuse me, Vice Mayor Hefty, what um, in
[1:00:30]
terms of the cascading effects, I take
[1:00:32]
it that we don't have cascading effects
[1:00:35]
because of the rabbit hole situation.
[1:00:37]
So, fire with an earthquake, flooding,
[1:00:40]
you do reference flooding with an
[1:00:42]
evacuation route, but are those all
[1:00:45]
usually saved for the annex crosswalk
[1:00:47]
situation?
[1:00:48]
>> That would usually be uh, you would want
[1:00:50]
to use that from an emergency planning
[1:00:52]
perspective. However, um we have
[1:00:54]
incorporated some text in the past that
[1:00:56]
talks about how ads are have cascading
[1:00:59]
effects. I think it's very very
[1:01:01]
appropriate to put an add.
[1:01:04]
>> Great. Thank you. Um and then last
[1:01:06]
question. I noticed that quite a few of
[1:01:08]
the maps weren't it said would be
[1:01:11]
updated. Um could you explain that
[1:01:14]
situation?
[1:01:15]
>> We're waiting on some additional data
[1:01:17]
from the townologist apparently they
[1:01:19]
were going to an update as well. So we
[1:01:21]
wanted to time it to make sure once
[1:01:24]
their maps were fully updated, we could
[1:01:26]
then incorporate the data shouldn't or
[1:01:28]
the map shouldn't change significantly,
[1:01:30]
but we would just wanted to make sure
[1:01:32]
that there was a footnote that there's
[1:01:34]
potential for that.
[1:01:35]
>> Okay, great. Those are my questions.
[1:01:37]
Thank you.
[1:01:38]
>> Thank you, Nicholas.
[1:01:40]
>> Yeah, EDIC. Uh, three questions. is
[1:01:46]
are the uh elements that are included in
[1:01:49]
here meant to be self-executing? There
[1:01:52]
are words like enforce, ensure
[1:01:56]
that our command things that need to be
[1:01:59]
done. That is and that creates legal
[1:02:02]
obligations both for residents and also
[1:02:07]
creates an obligation and potentially a
[1:02:10]
duty on the part of the uh town. And so
[1:02:14]
if they're not performed then there's a
[1:02:17]
question of what that means.
[1:02:20]
>> Yes. Are the are the
[1:02:23]
are those is that language meant to be
[1:02:26]
self-executing
[1:02:28]
>> the policies and actions when their
[1:02:33]
account responsibility or account is
[1:02:35]
trying to oversee uh or or uh prevents
[1:02:39]
uh open condition. We're trying to use
[1:02:42]
the right language to make sure that happens. Right? We will often have
[1:02:46]
a policy says don't put homes in flood
[1:02:48]
plane. So we want to make sure that
[1:02:50]
you're enforcing flood regulations to
[1:02:52]
make sure the homes don't get put in the
[1:02:53]
flood plane. That policy should be kind
[1:02:56]
of self-regulated. You would have
[1:02:58]
essentially have somebody, you know,
[1:03:00]
submitting an application to the
[1:03:01]
planning department and their home is
[1:03:03]
smack dab in the middle of the flood
[1:03:05]
plane. Well, you can then reference that
[1:03:06]
policy basically does not allow us to do
[1:03:09]
that. You need to go home. So that's
[1:03:11]
really the intent of of how the policies
[1:03:13]
are written is really to help staff as
[1:03:16]
well as appointing elected officials
[1:03:18]
when they're getting projects across
[1:03:20]
their debts that are not meeting the
[1:03:22]
standard.
[1:03:25]
That answer your question in part. Um so
[1:03:29]
there are examples in which there said
[1:03:34]
to minimize risk or to limit the
[1:03:38]
potential of uh create a low-risk
[1:03:42]
condition that are
[1:03:47]
uh
[1:03:49]
not uh that that are discretionary in
[1:03:52]
nature. And it says that the town shall
[1:03:55]
do this and that the residents shall
[1:03:59]
presumably comply.
[1:04:02]
So it looks like kind of a
[1:04:07]
ordinance kind of direction being
[1:04:09]
included in a am I am I reading that
[1:04:13]
correctly or
[1:04:15]
>> is regulatory
[1:04:17]
>> but words like enforce and ensure
[1:04:21]
>> right
[1:04:21]
>> create specific obligations they are
[1:04:25]
execut
[1:04:26]
>> right and so we're we're saying force
[1:04:28]
hopefully we we've uh captured that
[1:04:31]
we're enforcing either an existing law
[1:04:34]
that's on the books or in code uh or
[1:04:36]
enforcing you know state statute uh you
[1:04:40]
know and often times what we have to do
[1:04:42]
is we have to understand that we maybe
[1:04:44]
misjudged on the right whether it was
[1:04:47]
informed or not um and so that's partly
[1:04:50]
what we also would hope council member
[1:04:54]
as you do your review doesn't mesh with
[1:04:58]
the long standard that or or tradition
[1:05:00]
that we've
[1:05:01]
where we're not enforcing this. This is
[1:05:03]
somebody else that enforces it. So, we need an outcome of it. So, um but
[1:05:07]
yes, you're right. At some point when
[1:05:10]
you say a word like require, you know,
[1:05:13]
that is basically you've got skin in the
[1:05:16]
game that you're making sure somebody's
[1:05:18]
doing something or what they say.
[1:05:21]
>> So, when you're using words and I and I
[1:05:23]
apologize for the time. Uh so when
[1:05:26]
you're using words like enforce, shall
[1:05:30]
require.
[1:05:33]
>> So it's like law.
[1:05:34]
>> We that should refer to a that is law.
[1:05:38]
But th those are that those that's
[1:05:41]
regulatory language. But what you're
[1:05:44]
saying is that should refer to a
[1:05:47]
specific existing obligation or and if
[1:05:52]
it has this kind of more nebulous to
[1:05:57]
create a low-risk condition
[1:06:01]
uh is without reference to any
[1:06:04]
statutory. Is that supposed to be I is
[1:06:09]
that should we be identifying areas
[1:06:12]
where you're using executive language
[1:06:16]
without referencing a statute?
[1:06:20]
Um, in some cases you don't have to
[1:06:22]
actually reference a set to apply that
[1:06:24]
policy as a a rule, right? So
[1:06:28]
>> to apply I'm sorry to apply it as a
[1:06:30]
rule,
[1:06:31]
>> a rule or a law or a requirement, right?
[1:06:34]
So um if you're not going to allow homes
[1:06:37]
in the flood plane, you can have a
[1:06:39]
policy don't allow homes in the flood
[1:06:41]
plane. Um, you can then also reference
[1:06:44]
your flood management ordinance, but you
[1:06:47]
don't have to reference the ordinance at
[1:06:50]
the same time.
[1:06:51]
>> There's language in here that seems to
[1:06:53]
create obligations out of full clock.
[1:06:57]
that are central for that.
[1:06:58]
>> And and in that context, that seems like
[1:07:03]
it's a self-executing
[1:07:06]
direction that isn't in reference to any
[1:07:11]
existing law. It may be a really good
[1:07:14]
idea. I'm just trying to understand
[1:07:17]
whether this Hey, Linda, please
[1:07:20]
respectful
[1:07:22]
is the qu the qu the question the
[1:07:24]
question is is it
[1:07:28]
is the language in here supposed to
[1:07:31]
create new obligations on individuals
[1:07:35]
and on the town
[1:07:38]
>> on some cases. In some cases it might.
[1:07:40]
Yeah.
[1:07:41]
and and those obligations may be backed
[1:07:43]
by changes to safe.
[1:07:46]
>> Yeah.
[1:07:46]
>> So do we have uh is is there is there
[1:07:49]
inclusion of costs that are associated
[1:07:52]
with this?
[1:07:53]
>> So often times the safety element will
[1:07:55]
not include the costs associated with
[1:07:57]
that. That's partly why we wanted to
[1:07:59]
have a study session that we could help
[1:08:02]
you all get up to speed on what's in
[1:08:06]
there and then you could start taking a
[1:08:07]
look at it because there are some policy
[1:08:10]
ramifications that you'll have to take a
[1:08:13]
look at as a the governing body.
[1:08:15]
>> Thank you.
[1:08:18]
>> All right. Thank you. All right. So, I'd
[1:08:20]
like to open it up for public comment.
[1:08:22]
Then we'll bring it back. We continue.
[1:08:23]
Again, this is a study session, so we're
[1:08:25]
going to continue to have questions,
[1:08:26]
discussions. Um, but with that, let me
[1:08:29]
go online. So, the first one is Zoom
[1:08:31]
user, which I think is still Dana.
[1:08:36]
» Can you hear me? No,
[1:08:38]
>> I can. Well, yeah, we can hear you.
[1:08:40]
>> Good. Um, so I mean, I hope the
[1:08:43]
obligations change as we learn more. I
[1:08:46]
mean, I went to the geology meeting the
[1:08:49]
other night and before we do anything, I
[1:08:51]
feel like I need to understand what are
[1:08:53]
the slip rates on the on the San Andreas
[1:08:56]
fault on the peninsula. Nothing has
[1:08:59]
changed in years and that needs to be
[1:09:02]
studied and we need to understand that
[1:09:04]
for our evacuations.
[1:09:07]
I I still feel like we're in the total
[1:09:09]
beginning of all of this and and I think
[1:09:12]
that puts us in danger if we are not up
[1:09:15]
to speed on all of this stuff. So, here
[1:09:18]
comes our our own geology committee last
[1:09:21]
week who puts forward this this talk and
[1:09:24]
it was very compelling and upsetting.
[1:09:27]
So, I hope that we um we look into all
[1:09:30]
of this stuff, the the the uh the
[1:09:33]
geology committee and I also think that
[1:09:36]
the staff needs to hear from residents
[1:09:40]
of the town because I don't think they
[1:09:42]
have the institutional knowledge yet of
[1:09:44]
what we what we understand about our
[1:09:47]
safety. Okay. Thank you.
[1:09:51]
>> Thank you, Dana and Jay.
[1:10:02]
Go ahead, MJ.
[1:10:04]
>> Oh, okay. So, first of all, Erin, I
[1:10:07]
think it's Erin. Uh, if you could speak
[1:10:09]
into the microphone a little closer. I
[1:10:11]
was really having trouble hearing you.
[1:10:14]
Um,
[1:10:16]
so my first question is when is the
[1:10:19]
safety element due? I think you said
[1:10:21]
that your your goal is to get it turned
[1:10:23]
over. uh by September, October. But but
[1:10:27]
is there actually a due date
[1:10:30]
from the state?
[1:10:33]
>> So NJ, this is your chance to comment.
[1:10:35]
Um it's not a question period. So if
[1:10:38]
>> other commissioners or council want to
[1:10:40]
answer ask those same questions, but
[1:10:42]
from you, I'm just looking for your
[1:10:43]
general comments.
[1:10:44]
>> Okay. So, um, one comment I have is that
[1:10:49]
to review the safety element as a Brown
[1:10:51]
Act committee, the wildfire committee
[1:10:53]
needs to put this on our agenda for next
[1:10:56]
Thursday. So I put a ad hoc subcommittee
[1:11:00]
together but basically we only have 7 to
[1:11:03]
10 days to review a thousand pages over
[1:11:06]
seven documents because I have also told
[1:11:09]
them that they need to look at the l uh
[1:11:12]
Samontro County LHMP the local hazard
[1:11:16]
mitigation plan that is currently under
[1:11:19]
review on the Santo County website. So I
[1:11:23]
kind of feel that the fact that this was
[1:11:25]
given to us with such a short turnaround
[1:11:28]
is almost like asking uh for just a
[1:11:32]
rubber stamp or or complete uh ignorance
[1:11:35]
from our committee. Uh another comment I
[1:11:39]
have is that there are a ton of policies
[1:11:41]
in this safety element. A lot of them
[1:11:43]
are assigned to town departments and
[1:11:45]
some aren't. I didn't understand why.
[1:11:48]
And also I noted that only a few
[1:11:51]
policies were actually assigned to
[1:11:53]
responsible town committees and I think
[1:11:56]
it would be nice, you know, we're here
[1:11:58]
to serve you guys and if you guys give
[1:12:00]
us responsibility for some of these
[1:12:03]
policies, we would take that on. So I
[1:12:06]
wanted to point that out. Thank you.
[1:12:09]
>> Thank you, MJ. Anybody else online?
[1:12:14]
All right. Going once, going twice. All
[1:12:16]
right. So we'll go to schoolhouse.
[1:12:17]
Anyone in the schoolhouse?
[1:12:19]
Rita,
[1:12:26]
thank you. Uh just a clarification in
[1:12:28]
referring to budget, are we talking
[1:12:30]
about the cost of contractors to revise
[1:12:33]
the contracts to the paperwork or
[1:12:37]
implementation of the things that are on
[1:12:40]
the list? you know, uh I really hope
[1:12:43]
that we have an opportunity, the
[1:12:45]
different committees, the different
[1:12:46]
residents have an opportunity to review
[1:12:49]
the updated maps and updated
[1:12:52]
information. When this process first
[1:12:53]
started, that was during COVID. That was
[1:12:56]
a different council. It was a different
[1:12:58]
planning commission. You know, there
[1:13:00]
weren't AI companies. There was it was a
[1:13:03]
different life five years ago. And you
[1:13:06]
know, people keep referring to different
[1:13:08]
meetings in the past. We even have I
[1:13:11]
think we're on our third or fourth um
[1:13:14]
town manager.
[1:13:16]
So, it's different people and I think we
[1:13:18]
need to look at the current information
[1:13:20]
that we have and uh we've been promised
[1:13:23]
that this was going to be done every
[1:13:25]
October for the past 5 years. Yeah,
[1:13:28]
October. It's going to happen in October
[1:13:31]
and promised and so it just seems a
[1:13:33]
shame to rush it because it means so
[1:13:35]
much to our town right now. You know,
[1:13:39]
there was a what 7.8 earthquake the
[1:13:42]
other day in one place, a 6.1 in Cuba
[1:13:45]
that affected Florida.
[1:13:48]
We're not prepared. And we were also
[1:13:50]
promised that the safety element should
[1:13:53]
have gone or was going to happen before
[1:13:56]
the housing element, but instead all the
[1:13:58]
resources of the town were put in for
[1:14:01]
the housing element. And there are
[1:14:03]
things there were lots of comments and
[1:14:05]
we could have saved a lot of money on
[1:14:06]
the housing element if the safety
[1:14:08]
element had come first. And uh my other
[1:14:12]
comment is about the
[1:14:15]
uh section five that's talking about the
[1:14:17]
storm drains. I've been part of a lot of
[1:14:20]
the budget discussions on Zoom or in
[1:14:23]
person and we're behind on getting that
[1:14:26]
done that mandated item done because we
[1:14:28]
don't have the money. But here it is in
[1:14:31]
the safety element saying that we're
[1:14:33]
going to do it. How are we going to sign
[1:14:36]
off on things that we say are important
[1:14:38]
to us that we're going to do and we
[1:14:40]
can't even do them on a regular basis?
[1:14:43]
So, I really hope that we take the time
[1:14:46]
to review the document, have an
[1:14:48]
opportunity for our committees and
[1:14:50]
current residents because a lot of
[1:14:52]
residents have changed in the past five
[1:14:54]
years and help them understand why this
[1:14:57]
is important.
[1:14:59]
Thank you for listening. Thank you.
[1:15:04]
>> Right. Anyone else in the schoolhouse?
[1:15:06]
>> Kim, please.
[1:15:13]
» Good evening everyone. Um, so like Rita
[1:15:17]
was saying, new staff, new people.
[1:15:19]
>> You might just introduce yourself.
[1:15:21]
Sorry.
[1:15:21]
>> Not everybody knows, especially people
[1:15:23]
online.
[1:15:24]
>> Sorry. It's Kim Giuli, division chief
[1:15:26]
and fire marshall with Woodside Fire
[1:15:27]
Protection District. So when I came on, on the 2023 draft and it
[1:15:33]
towards the tail end of my predecessor
[1:15:36]
and at that time there was a lot of back
[1:15:40]
and forth on the safety element back
[1:15:42]
then. It went to legal proceedings and a
[1:15:44]
legal agreement was reached between
[1:15:46]
Woodside Fire and the town staff to
[1:15:49]
develop an agreement on a work plan. And
[1:15:52]
it went to be called the work plan. Um
[1:15:56]
13 key approaches to fire safety and
[1:15:58]
seven requests of mitigations.
[1:16:00]
And so with this draft of the safety
[1:16:03]
element, I reviewed the entire safety
[1:16:05]
element. I am happy to see the amount of
[1:16:09]
progress and it makes sense that you
[1:16:10]
used the Calires because in the language
[1:16:13]
that was used, it made sense where it
[1:16:15]
needed to. So, it's nice to see that was followed to some. But in
[1:16:19]
Woodside Fire, we're very unique and we
[1:16:22]
have a lot more ordinances and um
[1:16:26]
Woodside Fire has a lot of blankets that
[1:16:28]
affect all of the district, not just a
[1:16:30]
part of it, and it's more restrictive
[1:16:32]
than state law. So, I am submitting
[1:16:36]
through the link that was provided um
[1:16:38]
because I do have a long list of
[1:16:41]
comments because I did um I did go over
[1:16:44]
each of the 18 items. Some of the items
[1:16:46]
were completely met in this reddraft.
[1:16:49]
Some of them are partially met. They
[1:16:51]
just maybe need some language addition,
[1:16:54]
some um some things that maybe were not
[1:16:56]
met. So, I will be submitting that for
[1:16:59]
you all to review. I also have some
[1:17:01]
recommendations on some rewrites as well
[1:17:04]
as there is some information in there
[1:17:06]
that I found that um was not accurate
[1:17:08]
and maybe just needs to be revisited.
[1:17:11]
So, just wanted to let you all know
[1:17:12]
that's been completed and will be
[1:17:14]
submitted today with the link.
[1:17:15]
>> Great.
[1:17:16]
>> Thank you.
[1:17:16]
Kim.
[1:17:19]
>> Great. Nan
[1:17:29]
safety element. I've been working on
[1:17:31]
this for four years since June. Can you
[1:17:34]
hear?
[1:17:35]
>> No,
[1:17:35]
>> you can't hear me
[1:17:37]
>> there.
[1:17:38]
>> Oh, okay. I've been working on this
[1:17:40]
since June 2022. It has been four years.
[1:17:44]
Um,
[1:17:46]
I hope town council members and planning
[1:17:49]
commission members that you
[1:17:52]
agree with me that this is a document
[1:17:54]
that's more than just check the boxes
[1:17:57]
and turn it into the state to meet uh
[1:17:59]
statutory requirements. This is a
[1:18:02]
document that controls should be
[1:18:04]
controlling what the town does to keep
[1:18:07]
itself safe. It's it to me it's it's
[1:18:10]
much more personal than just satisfying
[1:18:13]
the state laws and you know putting in all the all the
[1:18:21]
requirements.
[1:18:23]
Okay, that said um I think that this
[1:18:26]
draft in 2026 reads much more smoothly
[1:18:29]
than the 2022 draft. So thank you for
[1:18:32]
that. It's much much more readable. Um,
[1:18:35]
I like it better just generally the
[1:18:38]
organization is better. It's clearer.
[1:18:41]
Um, I think a lot of that comes from
[1:18:42]
taking the third level of detail, the
[1:18:44]
implementation actions out of the
[1:18:46]
document itself and putting them in the
[1:18:48]
appendix. So that that was a good good
[1:18:52]
call. I find that a lot of the comments
[1:18:54]
we made in 2022 are in that list. So
[1:18:58]
they're in the document, but you don't
[1:19:00]
see them um in the body. That's fine.
[1:19:04]
Um for the geologic hazard section in
[1:19:07]
particular, um we've been going through
[1:19:10]
it pretty carefully and we found um
[1:19:13]
quite a few inaccuracies, misstatements
[1:19:16]
which we will point out. So we're going
[1:19:19]
to make some detailed
[1:19:21]
um detailed comp comments.
[1:19:24]
Uh we will note them and make
[1:19:26]
suggestions for changes.
[1:19:29]
Um,
[1:19:31]
one thing I will mention is a set of
[1:19:34]
geologic maps which I find, you know, I
[1:19:36]
know those maps intimately, but I find
[1:19:38]
going from one to the other very
[1:19:41]
confusing. Um
[1:19:44]
uh and you mentioned the LHMP, the local
[1:19:47]
hazard mitigation plan that captures the
[1:19:51]
seismic hazard of the town much better
[1:19:54]
than
[1:19:55]
um CGS or USGS. So um I would like to
[1:20:01]
look um in more detail and have more
[1:20:04]
detail from LHMP in the um in the safety
[1:20:08]
element in the uh seismic hazard
[1:20:11]
section.
[1:20:14]
uh for cascading hazards. Yes. Uh you
[1:20:16]
mentioned it once at least in geological
[1:20:19]
hazard section, but it's so important in
[1:20:22]
this town because all we have to do is
[1:20:24]
have a large earthquake. Oops, I've gone
[1:20:26]
over time. Sorry. Um we get a fire, we
[1:20:30]
have to evacuate, we get landslides, we
[1:20:32]
get liquefaction. It's it's a very real threat here and it's sort of
[1:20:40]
glossed over and I would like to find a
[1:20:42]
way to um to say more about that. I'm
[1:20:46]
not sure how you do that.
[1:20:47]
>> So Nan, I'm going to have to ask you to
[1:20:49]
stop.
[1:20:50]
>> Yeah.
[1:20:50]
>> Great. Thank you.
[1:20:51]
>> Thank you.
[1:20:52]
>> Right. Anyone else in the schoolhouse?
[1:20:55]
All right. So with that, I'm going to
[1:20:56]
bring it back to the council and the
[1:20:58]
commission. Um, Linda, do you wanna, you
[1:21:02]
know, we've got roughly a half hour, so
[1:21:05]
that means we have roughly three minutes
[1:21:07]
per um do you want to run through your
[1:21:10]
commissioners?
[1:21:12]
>> That sounds good.
[1:21:13]
>> Thank you.
[1:21:13]
>> Uh, I'll go through them uh
[1:21:15]
alphabetically, which means that we
[1:21:17]
start with me. Um, I've I've written nations laws. I've written
[1:21:26]
the nuclear waste laws that apply to
[1:21:28]
this nation. They've all been challenged
[1:21:29]
and they've all been substained. I've
[1:21:31]
written hazardous waste loves and
[1:21:32]
nuclear waste laws. And um my point is
[1:21:37]
this is so far away from anything that I
[1:21:40]
would like to see go on our code that
[1:21:42]
it's hard to know where to start. I have
[1:21:44]
comments on every single page where I
[1:21:47]
think the language has been sort of
[1:21:49]
careless or or inexact. And I think
[1:21:52]
these are topics where you have to be
[1:21:54]
very exact. There are some areas that
[1:21:56]
are very exact but I mean for example
[1:21:57]
the first line says it's an affluent
[1:21:59]
community unnecessary. Who decided that?
[1:22:02]
Why did you include it? Uh I can go to
[1:22:06]
page uh and these may be details but
[1:22:10]
it's it's it's a point that's made
[1:22:11]
throughout the document. You have a page
[1:22:14]
37 a table that says hazards safety
[1:22:17]
risk. I always my eyeballs always pop
[1:22:20]
open when I see a slash. It's a hazard
[1:22:22]
list. I don't know why you called safety
[1:22:25]
in there. It's just inexact. I don't
[1:22:27]
know what the slash means. Just examples
[1:22:30]
of situations like that. Uh I'm going to
[1:22:34]
have a bigger comment here. Uh for
[1:22:35]
example, I know the law requires you to
[1:22:37]
mention military uh activities. Mention
[1:22:41]
um and I could pull up the page uh
[1:22:43]
Moffett Field. I'm not sure that Moffett
[1:22:46]
Field is still functional to begin with
[1:22:48]
in any way that's relevant, but in any
[1:22:50]
case, then you add another paragraph
[1:22:51]
about, well, maybe Muffetfield would
[1:22:53]
help us to me that those kinds of
[1:22:56]
comments make this very unfocused and
[1:22:59]
very difficult for a user or the town or
[1:23:03]
anybody else to evaluate it. Which
[1:23:06]
brings me to my second comment. Um,
[1:23:10]
I feel like you've missed the boat in a
[1:23:12]
few major areas. I I just got back from
[1:23:15]
a trip where we were on and off boats
[1:23:16]
and I think of how you know when the
[1:23:18]
boat's there and you step out and you
[1:23:20]
hope the boat's not going to bounce away
[1:23:22]
so you fall in the water. I kind of feel
[1:23:24]
like you're close to falling in the
[1:23:25]
water on a couple of things. The point
[1:23:28]
here when you write a law or you write a
[1:23:30]
rule or you write a brief is you figure
[1:23:33]
out what your point is and then you make
[1:23:35]
it and you can make a paragraph. The
[1:23:37]
lovely thing about a computer is you can
[1:23:39]
write that paragraph. Well, we're a
[1:23:40]
bunch of guinea pigs here in a town
[1:23:43]
that's got earthquakes, fire, every
[1:23:46]
natural disaster you can imagine with
[1:23:48]
only two roads in and out. And we're
[1:23:51]
like the guinea pigs that are rolling
[1:23:52]
around on the little wheel. But we're
[1:23:54]
not going to be on the wheel. We're
[1:23:55]
going to be stuck on the road. So the
[1:23:57]
thing that really gets lost here is the
[1:24:00]
fact that the most important thing for
[1:24:02]
this town is your job to educate which
[1:24:06]
is part of the safety element and your
[1:24:08]
job to inform which is part of the
[1:24:10]
safety element but then your job to set
[1:24:12]
the goals and the implementation
[1:24:14]
measures really only focus on one thing
[1:24:17]
I'm overexaggerating to make my point
[1:24:19]
which is evacuation. Um, so moving on,
[1:24:23]
um, just a little bit from that point.
[1:24:26]
Um, I love all the figures, but they all
[1:24:30]
use a different base map. I can't even
[1:24:32]
tell you where the town lines are.
[1:24:34]
There's mistakes in the figures. I live
[1:24:36]
in Porto Valley Ranch. It's not a county
[1:24:39]
park. It happens to be private land,
[1:24:41]
although other people might think
[1:24:42]
otherwise. Um, I think there's a failure
[1:24:45]
to make really important judgments.
[1:24:48]
Let's look for example at figure two.
[1:24:50]
And I I will I will stop in one more
[1:24:53]
minute, Craig, but I just want to get
[1:24:55]
the point across that my points that I
[1:24:57]
have on every single comment. Figure two
[1:24:59]
treats the the area I think it's where
[1:25:02]
Nicholas lives over there in the upper
[1:25:04]
left and the ranch the same way as it
[1:25:07]
treats a culde-sac off of Westridge
[1:25:09]
where there's one house. If you were to
[1:25:12]
talk about evacuation, you need to
[1:25:14]
figure out how to get the four the 200
[1:25:17]
households at the ranch, which is 20% of
[1:25:20]
the town's population, and these other
[1:25:22]
ones over there off of Portola Road out
[1:25:25]
of town. That's a whole lot different
[1:25:27]
from getting two people who live on a
[1:25:29]
street
[1:25:31]
that that's the only house on the
[1:25:32]
street. So, I think that the the failure
[1:25:35]
to kind of do a more detailed analysis
[1:25:37]
here to me is a missed opportunity. And
[1:25:40]
then the final point I will make is that
[1:25:41]
putting all these definitions in here
[1:25:43]
are really nice, but you haven't used
[1:25:45]
incorporation by reference. You haven't
[1:25:47]
used appendices. Who needs to have all
[1:25:49]
these definitions? What you really need
[1:25:50]
is to get to the guts of it, which is
[1:25:52]
your evaluation and your I'm out of
[1:25:54]
time. I know, but uh uh I want to paint
[1:25:58]
that picture. Thank you, Mr. Chairman.
[1:26:00]
>> You're welcome. That was so hopefully
[1:26:02]
you'll keep your Yeah, that was your
[1:26:03]
five. And you're supposed to have
[1:26:04]
minutes, right? You're supposed to have
[1:26:05]
three.
[1:26:06]
>> Oh, okay. Oh, I'm sorry.
[1:26:07]
>> Yeah, we're down to three. So, if you
[1:26:09]
could
[1:26:09]
>> Ronnie will be next.
[1:26:12]
>> Um, I I did send some comments to staff
[1:26:15]
late last night. Did those make their
[1:26:16]
way to you? Is that the best way to
[1:26:17]
comment?
[1:26:18]
>> Yeah, we I I already reviewed um your
[1:26:20]
comments and I appreciate the the detail
[1:26:22]
that you provided.
[1:26:23]
>> Okay, great. Uh so, yeah, I guess the main kind of policy one I wanted to
[1:26:30]
raise was this policy S3.2 two uh which
[1:26:34]
is about construction
[1:26:36]
um in a fault zone setback and
[1:26:38]
specifically the San Andreas fault zone.
[1:26:41]
Um the policy after that 3.3 is um about
[1:26:47]
construction in in other fault zones I I
[1:26:49]
think not outside of San Andreas and 3.3
[1:26:52]
kind of um allows for construction when
[1:26:55]
there's you know uh uh studies and
[1:26:58]
mitigation measures etc. But but 3.2 two
[1:27:02]
in the San Andreas fault zone seemingly
[1:27:04]
like completely disallows um
[1:27:07]
construction and uh I mean I I believe
[1:27:11]
that would be a significant change from
[1:27:13]
what we currently have in place and you
[1:27:15]
know we do have properties that are
[1:27:17]
completely covered by um sort of these setbacks and so I I don't know if
[1:27:23]
you want to briefly respond is is
[1:27:26]
>> I read I read your comments uh and I
[1:27:29]
agree that there is a little bit
[1:27:31]
ambiguity. One of the things I want to
[1:27:32]
do is I want to take a look at the
[1:27:35]
previous element that um that's
[1:27:37]
currently adopted just to verify that we
[1:27:39]
weren't reusing language. We may have
[1:27:41]
repurposed an existing policy and that
[1:27:44]
might be where there's that inongruity.
[1:27:46]
The other thing too is we also uh
[1:27:48]
coordinating with the town geologists
[1:27:50]
and making sure that the town geologist
[1:27:51]
is comfortable with language. So, we'll
[1:27:53]
bring up your comments as well with the
[1:27:55]
town geologist just to make sure that um
[1:27:58]
we're capturing that because I I do
[1:28:00]
agree with what you're saying. It seems
[1:28:02]
like we're using a different standard
[1:28:04]
when one standard probably is more than
[1:28:06]
adequate, but we want to verify with the
[1:28:07]
town geologist.
[1:28:08]
>> Okay. Okay. Great. Yeah. So the main
[1:28:11]
comment is um you know I think we you
[1:28:13]
know we want to disallow unsafe building
[1:28:16]
but if there are studies and mitigation
[1:28:18]
measures I think that we should you know
[1:28:22]
accommodate that since we do have many
[1:28:24]
faults running through the town.
[1:28:26]
>> Um
[1:28:27]
that was kind of the main substantial
[1:28:29]
one. Um
[1:28:32]
uh I I did um
[1:28:35]
so me many of the policies like in 3.5
[1:28:40]
and in 5.6 um are identified as being
[1:28:43]
part of the public works department and
[1:28:45]
maybe I just don't understand our what
[1:28:48]
our public works department does but to
[1:28:50]
me it seemed like they were outside of
[1:28:52]
the scope of what I understood them to
[1:28:54]
do. like for example
[1:28:57]
kind of almost negotiating across
[1:28:59]
utility companies, Woodside Fire
[1:29:01]
Protection District, neighboring towns,
[1:29:03]
etc. Um, maintaining development
[1:29:06]
standards. Um, so yeah, I guess m maybe
[1:29:10]
just review if the public works
[1:29:13]
department is really the right agency or
[1:29:17]
>> Yeah, planning and I are going to take a
[1:29:18]
look at those comments and then we'll
[1:29:20]
also touch base with public works.
[1:29:22]
>> I'm sorry, but I'm got a gun to my head.
[1:29:24]
That's four minutes.
[1:29:27]
>> That That was three. Veronica, can I ask
[1:29:29]
that you just put up the timer? That'll
[1:29:30]
I think help everybody through.
[1:29:37]
» Ronnie, Doug, going alphabetically here.
[1:29:41]
>> Uh I will go under my time. Uh
[1:29:44]
>> thank you.
[1:29:46]
I just have a like a general question
[1:29:49]
that that I think goes similar to Linda
[1:29:52]
in the this seems daunting to me for the
[1:29:56]
town to accomplish all of this. Um, and
[1:29:59]
so my general question is how does this
[1:30:02]
compare to the minimum that the state
[1:30:04]
requires and then what is being added on
[1:30:07]
in top of that because that's unique to
[1:30:09]
our community and as then it relates to
[1:30:14]
the implementation actions.
[1:30:17]
It feels to me like there should be some
[1:30:19]
prioritization
[1:30:20]
of these because I think the chance of a
[1:30:23]
flood is a lot less than a fire. And so
[1:30:26]
maybe that's where we should be spending
[1:30:27]
our time and directing our resources. Or
[1:30:30]
maybe that's not a good example, but you
[1:30:32]
get the idea. We as a community should
[1:30:34]
decide on what our priorities priorities
[1:30:37]
are and and realize that we have a
[1:30:39]
limited set of resources to get those
[1:30:41]
done and that should be reflected in
[1:30:43]
this document somehow. And if I'm just
[1:30:46]
clarifying when you say ad daunting, are
[1:30:48]
you talking about the scope of all of
[1:30:50]
the goals, policies, and actions that
[1:30:51]
are in the element or the entire element
[1:30:53]
itself?
[1:30:55]
>> Uh the goals that are within the element
[1:30:58]
which then translate to Craigslist,
[1:31:01]
which then becomes even bigger.
[1:31:03]
>> Yeah. Uh and sorry to laugh when you
[1:31:06]
said Craigslist. I was I went to
[1:31:10]
>> sell everything. But to to answer the
[1:31:12]
question from a priority perspective,
[1:31:13]
the safety element is agnostic when it
[1:31:15]
comes to priority. Not because one
[1:31:18]
hazard is more or less important than
[1:31:19]
the other, but because we want to give
[1:31:21]
you as many tools as possible. What we
[1:31:24]
want you then to be able to do as a
[1:31:25]
community is that once it's adopted, you
[1:31:28]
then decide which of the tools you want
[1:31:30]
to pull out and start using the most
[1:31:32]
because you have the greatest need. So
[1:31:35]
with that, you we we're trying to give
[1:31:37]
you as many ways for you to help your
[1:31:40]
community with all of the various issues
[1:31:43]
that we've identified.
[1:31:45]
And then on an annual basis, that's when
[1:31:48]
you're working with all of the town
[1:31:49]
departments on what are some of the
[1:31:51]
priorities and they're going to then
[1:31:52]
look at the general plan implementation
[1:31:54]
actions to to back and reinforce back up
[1:31:57]
and reinforce those priorities with oh,
[1:31:59]
we have an action for this. we we we
[1:32:02]
we're we're implementing this policy or
[1:32:03]
action, you know, and that's that's what
[1:32:06]
the the safety element is usually
[1:32:07]
designed for. It doesn't mean that your
[1:32:10]
community has to follow that. If you
[1:32:11]
want to do something different, I know
[1:32:13]
you have plans for an additional list or
[1:32:15]
some other things, you have the the
[1:32:18]
wherewithal to do that. So, but the
[1:32:21]
safety element in and of itself is not
[1:32:24]
intended to go ahead and start
[1:32:25]
prioritizing things for you because we
[1:32:27]
also know that communities issues change
[1:32:30]
on an annual on a regular basis.
[1:32:33]
So, the prioritization needs to come
[1:32:35]
outside of the element. It needs to come
[1:32:37]
as part of that annual process of upkeep
[1:32:40]
to the elements.
[1:32:41]
>> Okay.
[1:32:44]
>> Uh, alphabetically, Nicholas, you're
[1:32:46]
next. So building on those points and
[1:32:51]
reverting back to the mandatory
[1:32:54]
language, there are
[1:32:59]
very many uh examples where the town
[1:33:04]
shall do things shall will ensure will
[1:33:08]
enforce
[1:33:11]
placing obligations on the town. But I
[1:33:15]
mean to your point,
[1:33:18]
these aren't necessarily prioritized,
[1:33:21]
but if there's a mandatory obligation,
[1:33:26]
it um and if the language isn't as
[1:33:30]
precise as it might be or could be, uh
[1:33:36]
it feels as though there is a they're not policies to be implemented.
[1:33:44]
But
[1:33:46]
there are directions that we must take.
[1:33:50]
But as you said, we don't necessarily
[1:33:53]
want to take all of them because they
[1:33:55]
may not be priorities. But if the
[1:33:58]
language says that we shall do it or
[1:34:00]
that we shall enforce it, it seems to
[1:34:02]
cut against that. So I found that
[1:34:04]
confusing.
[1:34:05]
I also
[1:34:07]
uh
[1:34:09]
felt that a lot of it felt very
[1:34:11]
bureaucratic you know and that's you
[1:34:13]
know it's coming from a land use and
[1:34:16]
environmental attorney
[1:34:19]
but there's a
[1:34:21]
operation and maintenance agreement that
[1:34:24]
shall be enforced for vegetation
[1:34:26]
management
[1:34:29]
really. So, we're going to have for
[1:34:31]
every new project or remodel, we're
[1:34:36]
going to have an on andm agreement that
[1:34:38]
is
[1:34:40]
enforcable. It's like without
[1:34:42]
description of what these things are and
[1:34:45]
what the enforcement mechanisms
[1:34:48]
very very very prescriptive.
[1:34:51]
>> Some of it absolutely is prescriptive if
[1:34:53]
I can jump in. Part of that, especially
[1:34:56]
on the wildfire section, is because
[1:34:58]
CalFire is looking for a lot of
[1:35:02]
um or that they're asking for a lot of
[1:35:04]
new requirements be incorporated into uh
[1:35:07]
general plans as part of that uh CalFire
[1:35:09]
review process. So like that operations
[1:35:11]
and maintenance item that you're
[1:35:13]
identifying, that's a CalFire thing.
[1:35:15]
What they want to make sure is that you
[1:35:18]
don't have a developer who comes in and
[1:35:20]
says, "Hey, I'm going to build this
[1:35:21]
development. uh we're going to do all
[1:35:23]
this landscaping. Oh, and by the way,
[1:35:25]
yeah, we forgot that we're not going to
[1:35:27]
have set aside any money to actually
[1:35:28]
maintain it. And so then what happens is
[1:35:31]
because you don't have an operations and
[1:35:32]
maintenance agreement, who gets stuck
[1:35:34]
with the bill when that is overgrown and
[1:35:37]
you're being told that it needs cut
[1:35:39]
back? So that's the purpose behind that
[1:35:42]
policy is that CalFire has learned over
[1:35:44]
the years by not having that requirement
[1:35:47]
on their own land that they want to
[1:35:48]
start seeing a lot of cities in
[1:35:50]
California that are under their program
[1:35:54]
to start to incorporate that in as well
[1:35:56]
because they've been burned as well.
[1:35:57]
>> So they they have been burnt. the uh I I
[1:36:01]
would just point out that rather than
[1:36:03]
having prescriptive language or
[1:36:06]
proscriptive language that one could
[1:36:09]
have adopt an ordinance or consider
[1:36:13]
adopting an ordinance to ensure the
[1:36:16]
long-term
[1:36:18]
uh sustainability
[1:36:20]
and vegetation management to address
[1:36:23]
fill in the blank rather than to have a
[1:36:28]
mandatory new bureaucratic
[1:36:32]
element that is
[1:36:35]
using executive language in a general
[1:36:39]
plan. And the problem we run into is
[1:36:41]
unless that ordinance already exists and
[1:36:43]
we haven't seen the comments from
[1:36:45]
Woodside Fire Protection District, maybe
[1:36:47]
they already have something that we
[1:36:49]
could rely on. If we don't, you now have
[1:36:51]
a gray area where you now basically have
[1:36:53]
something that you would want to
[1:36:55]
enforce, but you have no way to enforce
[1:36:56]
it if you don't have a policy in your
[1:36:58]
general plan to allow you to. the
[1:36:59]
general plan respectfully and I'm
[1:37:01]
mindful of the time
[1:37:03]
>> yeah thank you says that would be of the
[1:37:06]
form adopt a ordinance that does
[1:37:10]
something
[1:37:11]
>> yeah we can definitely I mean
[1:37:12]
>> rather than saying that this thing
[1:37:15]
exists and the town shall implement it
[1:37:18]
based on the GP itself
[1:37:19]
>> it's a it's a it's an issue of the time
[1:37:21]
lag if there's a concern about
[1:37:23]
>> I think we need to move on
[1:37:24]
>> sure
[1:37:25]
>> uh Karen
[1:37:26]
>> yeah um my comments actually link
[1:37:28]
Nicholas's is to nans and that I also
[1:37:31]
found and I sent you 11 um comments and
[1:37:35]
questions earlier um so I hope you have
[1:37:37]
those and
[1:37:37]
>> yeah we reviewed
[1:37:38]
>> I will just go through these for the
[1:37:41]
community here um because I found the
[1:37:44]
language also confusing and that I
[1:37:46]
wanted to know are we going to explore
[1:37:48]
these particular things are we going to
[1:37:51]
actually are we are we or are we not
[1:37:53]
going to ever have an evacuation
[1:37:55]
are we uh are we or are we not um going
[1:37:59]
to explore widening Alpine Road. I know
[1:38:02]
that would cost a lot of money, but I
[1:38:03]
think that we need to consider that and
[1:38:05]
I don't think that should be on the
[1:38:06]
other list. Um and it could be not
[1:38:10]
necessarily required, but we should
[1:38:11]
explore these things. Um another thing
[1:38:13]
that would not be that expensive is
[1:38:15]
TFAS, temporary fire refuge areas. And I
[1:38:18]
know that the priority has um would explore that with us. Um, and that
[1:38:24]
would be in the cascading disaster that
[1:38:27]
if we had an earthquake, the roads are
[1:38:28]
closed, they're somewhere safe, um, if
[1:38:31]
the fire fire goes out for the
[1:38:32]
community. Um, do we have a sufficient
[1:38:34]
reserve fund that if the roads are are
[1:38:37]
broken that we have enough money to get
[1:38:40]
them quit fixed very quickly? Um, home
[1:38:43]
hardening um, expansion for both this
[1:38:46]
building. Have we cleaned up the town
[1:38:48]
center itself? Uh, what about
[1:38:50]
businesses?
[1:38:52]
Um, and this very small minor thing, but
[1:38:55]
are the sewer pump stations um, will
[1:38:58]
they support a flood? Are we going to
[1:38:59]
have a sewer sewer issue? So, these are
[1:39:01]
all like are I'm not saying that we
[1:39:03]
should necessarily do all these things,
[1:39:04]
but I have no idea whether or not we are
[1:39:07]
going to explore them. And I don't think
[1:39:08]
that should be on the safety and
[1:39:10]
resilience list. So, I'll leave my
[1:39:11]
comments at that.
[1:39:14]
>> Thank you. Um, one of the things you you
[1:39:17]
did wrong and then I'll close off our
[1:39:19]
comments, but I see Karen has a minute
[1:39:20]
left. One of the things that I found
[1:39:22]
very frustrating,
[1:39:23]
>> but I would say you guys extra minutes.
[1:39:25]
So,
[1:39:25]
>> you've made you you've made Stamford's
[1:39:28]
properties our problem. And my initial
[1:39:31]
comment about us being guinea pigs here
[1:39:33]
surrounded by problems. We're surrounded
[1:39:35]
by property we don't own and we don't
[1:39:37]
control. Midpen, Stamford, uh, all your
[1:39:41]
stuff about water and creeks and the
[1:39:43]
lakes, uh, that's all on Stanford
[1:39:45]
property and they've done a lot of stuff
[1:39:47]
on there. So, you've raised a lot of
[1:39:48]
questions that you don't need to raise
[1:39:50]
or you need to raise in a different way.
[1:39:52]
Thank you. Um, respectful time. Sorry.
[1:39:55]
>> Thank you.
[1:39:57]
>> Sorry.
[1:39:59]
>> All right. So, now I'm going to bring it
[1:40:00]
back to the council for comments. So,
[1:40:02]
Helen, why don't I start with you?
[1:40:06]
>> Sure. Thank you. Um, a couple of quick comments. Um,
[1:40:12]
uh, first, the military at Moffett does
[1:40:14]
still exist.
[1:40:16]
We get the our reserves are there for
[1:40:18]
instance. Um, you get people folks in
[1:40:21]
camo around Mountain View for instance.
[1:40:24]
Um, that's just a side note. Um, in
[1:40:27]
terms of sending it to the other
[1:40:30]
committees, I'm very concerned that we
[1:40:34]
have been working on this for five
[1:40:35]
years.
[1:40:37]
Um, obviously this is as a council
[1:40:39]
member I'm new new newish new one of the
[1:40:42]
newer members on this body. So this is
[1:40:45]
my first bite at the apple but and I
[1:40:47]
don't want to rush this but the town has
[1:40:50]
been working on this for 5 years and I
[1:40:52]
am very worried about scope creep and
[1:40:55]
extended you know extending the cost. Um
[1:40:58]
I appreciate that staff has left this
[1:41:01]
open for a month for public comment. I
[1:41:04]
appreciate that we are this body is
[1:41:06]
meeting with the planning committee. Um
[1:41:11]
so you know I I am very worried about
[1:41:14]
scope creep. I would like to get this
[1:41:16]
plan done um because then it allows us
[1:41:19]
to apply for other grants that would
[1:41:22]
help to keep us safe. Cuz for instance,
[1:41:25]
as we go out for a grant for the
[1:41:27]
evacuation route that they will ask on
[1:41:30]
the grant application, is this named in
[1:41:33]
a document in your safety element or a
[1:41:36]
plan? Right. And so we so I want to tr
[1:41:41]
personally I mean I am worried about
[1:41:44]
trying to continue to take this
[1:41:45]
elsewhere um uh the other committees. So
[1:41:50]
I just wanted to be on the record for
[1:41:51]
that. Um basically don't let the perfect
[1:41:55]
be the enemy of the good. Right. Um
[1:41:59]
so um there are and I appreciate having
[1:42:03]
all of your eyes on this document. I
[1:42:06]
really do appreciate like I love the
[1:42:08]
idea of the temporary fire locations
[1:42:09]
that was forgotten. Um I appreciate you
[1:42:13]
know some of the um verbiage that you
[1:42:16]
know that would help potentially to make
[1:42:19]
sure the um tense is in the correct
[1:42:21]
place. Um but I did want to you know
[1:42:24]
make sure that hopefully we can uh move
[1:42:27]
this document forward. Thank you.
[1:42:30]
>> Thank you Helen Mary.
[1:42:34]
Speaking of the devil,
[1:42:37]
>> document. Am I the devil?
[1:42:39]
>> No. No. The fire trucks are coming
[1:42:41]
through the parking lot.
[1:42:46]
» Call them, Kim.
[1:42:48]
>> Are they coming to get you?
[1:42:54]
» Well, uh I I have a question u that I
[1:42:57]
maybe know should know the answer to. Um
[1:43:00]
but and it's been the thing I've been
[1:43:02]
pursuing in this is what the obligation
[1:43:05]
of the safety element is and uh what the
[1:43:09]
safety element obliges the town
[1:43:12]
to do in terms of quantifying the number
[1:43:16]
of cars, people, disabled persons,
[1:43:20]
animals, trailers, trucks, vans, etc.
[1:43:25]
work. I know we we have a list of
[1:43:27]
temporary workers. we have but the
[1:43:30]
people who are actually here and who
[1:43:31]
have to get out uh I feel there's a need
[1:43:35]
to have those numbers and I don't think
[1:43:37]
we have them um certainly accurately
[1:43:41]
uh maybe that's maybe we can't get them
[1:43:44]
but uh is that an obligation that the
[1:43:46]
state is putting on us
[1:43:48]
>> it is not an obligation no
[1:43:50]
>> it's not in at all okay
[1:43:52]
>> no because again the safety element is
[1:43:53]
for all people in the town so by us not
[1:43:57]
quantif ifying. You've covered
[1:43:59]
everybody.
[1:44:01]
>> Okay. Animals.
[1:44:03]
>> It's It's for It's for everybody.
[1:44:05]
>> For the town's resources, right? And
[1:44:07]
residents, businesses, animals.
[1:44:10]
Absolutely.
[1:44:11]
>> Well, I I will go uh I think these are
[1:44:13]
the eighth graders, by the way. They actually won't hurt us.
[1:44:19]
>> Say that.
[1:44:20]
>> I don't have one anymore.
[1:44:23]
Okay. So, uh, the primary thing that I
[1:44:26]
want to get back to is the unique
[1:44:29]
situation of our, uh, risk, our wildfire
[1:44:33]
risk following earthquake and why that's
[1:44:36]
important and why, uh, again, I don't
[1:44:40]
want to be the person using the example,
[1:44:42]
but we did have a LMA prieta earthquake.
[1:44:45]
My children were one and four and it was
[1:44:48]
very terrifying to have a major
[1:44:50]
earthquake to be told you had to stay
[1:44:52]
there and to know perfectly well that
[1:44:55]
fire following earthquake is the nay
[1:44:58]
number one thing and nobody
[1:45:01]
answering any kind of emergency
[1:45:03]
response. So I really feel you know we
[1:45:07]
were basically told we had no
[1:45:08]
electricity, no water, no way to take
[1:45:10]
care of ourselves and we couldn't leave.
[1:45:13]
Okay. So, that that's fire that's fire
[1:45:15]
risk and that's real. And I have found
[1:45:18]
that by far the biggest hazard I've ever
[1:45:21]
faced. Uh and I really think that we owe
[1:45:25]
ourselves
[1:45:26]
having this in our element.
[1:45:28]
>> Sure. Yeah. Again, I don't think uh
[1:45:31]
incorporating language into the element
[1:45:34]
is not a problem. If there's specific
[1:45:35]
policies that you think would be helpful
[1:45:37]
as well, we are more than welcome to.
[1:45:40]
>> It's all about education. It's it's
[1:45:42]
knowing that you're not alone and that
[1:45:44]
you actually have to go help everybody
[1:45:47]
else and have them figure it out.
[1:45:48]
>> For sure.
[1:45:49]
>> Thanks.
[1:45:50]
>> Thank you, Mary Judith.
[1:45:53]
>> Hey, I'm going to speak. Do not answer.
[1:45:56]
I'm taking my full three minutes. Um,
[1:45:58]
it's a great start.
[1:46:01]
I feel strongly it must come back to
[1:46:04]
council at a minimum and likely the
[1:46:06]
planning commission and council because
[1:46:10]
we don't know what comments you're going
[1:46:11]
to get. We don't know if they're going
[1:46:14]
to be consistent and we most importantly
[1:46:18]
haven't had a lot of the policy
[1:46:20]
discussions I feel are critical in order
[1:46:22]
to send something to outside
[1:46:25]
authorities. So I want it to come back.
[1:46:28]
Um, I do want it submitted sooner rather
[1:46:31]
than later, but done right. So, I'm not
[1:46:34]
for eons longer. We have to figure out,
[1:46:37]
pick a point in time where we're we're
[1:46:39]
ready to go and life will continue
[1:46:42]
changing. The state will continue
[1:46:44]
legislating. There's nothing we can do
[1:46:46]
about that. We got to get something
[1:46:47]
done. But we're close. We just need to
[1:46:50]
do it right. Um, I would in the future
[1:46:54]
like to see what is required by state
[1:46:57]
law per your discussion with
[1:46:59]
Commissioner Tar versus what is a policy
[1:47:02]
decision that we need to um contemplate
[1:47:06]
and weigh in because there's no point in
[1:47:08]
us debating if it's required. We can
[1:47:10]
work on the language. Um, all right. So
[1:47:14]
then moving on to some of the general
[1:47:16]
comments and I have a couple of
[1:47:17]
anecdotal examples but um I have more
[1:47:20]
and I can separately send in comments.
[1:47:23]
One is some some of the items are seem
[1:47:27]
at odds with the housing element uh
[1:47:29]
restricting on street parking uh
[1:47:31]
setbacks and fire hazard zones that kind
[1:47:34]
of thing. And I don't know if that's
[1:47:36]
correct or not. It's a question for you
[1:47:38]
to think about. There's a lot of policy
[1:47:41]
questions in here. um creating new
[1:47:44]
developments outside of the the fire
[1:47:47]
hazard safety concern areas. Well, good
[1:47:50]
in principle, but we've got a housing
[1:47:52]
element coming up in four years. Are we
[1:47:55]
locking ourselves right now into
[1:47:58]
developing in areas that might not be on
[1:48:02]
balance the right ones? It's a valid
[1:48:04]
question. There are things that are am
[1:48:06]
ambiguous. Um CWPP I don't think is
[1:48:10]
defined. um these these are things that
[1:48:13]
we can easily take care of. But what
[1:48:15]
does to ensure something mean to me? It
[1:48:19]
means to guarantee it will happen. I
[1:48:21]
don't think we're have the budget to do
[1:48:23]
that. Um in certain respects, uh the
[1:48:28]
costbenefit analysis is the policy uh
[1:48:31]
decision, but there are things about
[1:48:33]
removing um invasives or dangerous
[1:48:36]
plants in the right of way. Where is
[1:48:39]
that? Is it along the evacuation route?
[1:48:41]
No, it's somewhere in addition to that
[1:48:43]
because it says including the evacuation
[1:48:45]
route. We can't be spending money on
[1:48:48]
clearing everything to be safe. We have
[1:48:50]
to make sure the evacuation routes are
[1:48:53]
taken care of. There are private um
[1:48:56]
owner concerns. I think there if we're
[1:48:59]
imposing assessments, we got to be
[1:49:02]
careful to have those discussions. Um
[1:49:05]
scope creep. there is some uh invasive
[1:49:09]
species language. It doesn't seem safety
[1:49:11]
oriented. Um and then
[1:49:15]
um you know the requirement to enforce
[1:49:17]
we always have a problem with
[1:49:19]
enforcement in this town. We don't have
[1:49:22]
we we almost don't have a sheriff that
[1:49:24]
to help us enforce things. So it's it's
[1:49:27]
a real question on how to rephrase some
[1:49:29]
of that to be something we could Thanks.
[1:49:32]
>> Thank you, Judith.
[1:49:34]
>> Okay. Um, so I wanted to thank you for
[1:49:36]
putting this together and I know it's a
[1:49:38]
ton of work. Um, I have five general
[1:49:41]
comments. Um, the first one's pretty
[1:49:43]
minor, but the purpose has an order of
[1:49:46]
sections and then the TOC has a
[1:49:48]
different one. Um, I'd really like to
[1:49:50]
see those line up and I sort of feel
[1:49:52]
like the purpose one feel felt like the
[1:49:54]
right one and the TOC kind of felt like
[1:49:56]
maybe that's the state version, but it
[1:49:58]
didn't really feel like it matched the town. Um the next thing is this the
[1:50:04]
point that um Commissioner Tar was
[1:50:06]
getting at which is this new obligation.
[1:50:08]
I mean I really have a concern when I
[1:50:09]
look at this. I can't tell whether we're
[1:50:12]
creating B sort of soft ordinances
[1:50:16]
indirectly. Like it's just really hard
[1:50:18]
looking at this document which then
[1:50:20]
leads me to sort of my third one which
[1:50:22]
is sort of reviewing this before it goes
[1:50:25]
to the state agencies. I agree with
[1:50:27]
Judith. I'd like to see somehow
[1:50:30]
highlighted, maybe it's colorcoded, but
[1:50:32]
you know, what are policies that are
[1:50:34]
council discretion that we need to
[1:50:36]
decide on versus what are requirements
[1:50:38]
that just have to be there for v various
[1:50:40]
state reasons. So, I think that that's
[1:50:42]
going to be important because again, if
[1:50:45]
we have substantive changes and it's
[1:50:46]
already gone out to the state agencies
[1:50:48]
and it comes back, I I don't even
[1:50:50]
understand the process of does it have
[1:50:52]
to cycle back around like how many
[1:50:53]
cycles do we have to do? So, I'd rather
[1:50:55]
just cut that off ahead of time.
[1:50:58]
Um, the other one is I do want to be
[1:51:01]
mindful of budget. Um, you know, this is
[1:51:02]
S Sarah's been working hard to to stay
[1:51:05]
within this budget. So Sarah, I think
[1:51:07]
you're probably going to come back have
[1:51:08]
to come back with whatever additional
[1:51:10]
budget you think you need to do this
[1:51:12]
based on the comments. So that's I think
[1:51:15]
that basically covers where I'm at. I
[1:51:18]
would like to encourage everyone
[1:51:19]
including all the committees to get your
[1:51:22]
comments in. I personally would be okay
[1:51:24]
if you extended the deadline for
[1:51:26]
comments, but you know, I'm going to
[1:51:28]
leave that to staff, but the important
[1:51:30]
thing is that everybody get their
[1:51:31]
detailed comments in. And you know,
[1:51:34]
Commissioner Tar, if you can go through
[1:51:36]
and point out the things that are, you
[1:51:37]
know, like these are obligations that
[1:51:39]
need to be discussed. The more we can
[1:51:41]
help the consultant identify these
[1:51:44]
things quickly, the less money we'll
[1:51:45]
spend on the consultant trying to figure
[1:51:47]
it out for himself. That would be great.
[1:51:49]
On the other hand, you know, Erin, I've
[1:51:51]
worked with you some in this process. I really value your time and expertise.
[1:51:55]
So, I just wanted to say thank you for
[1:51:57]
all the effort that went into this. Um,
[1:51:59]
and I'm looking forward to seeing the next round.
[1:52:04]
Okay. So, with that, it is 6:53. Um, I'm
[1:52:09]
going to call for a motion to adjurnn
[1:52:12]
since the council gets a little
[1:52:14]
breathing room before we start a seven
[1:52:16]
o'clock council meeting. So, do I have a
[1:52:18]
motion to adjurnn?
[1:52:20]
So moved.
[1:52:21]
>> All in favor?
[1:52:22]
>> I thank you everyone. Thank you very
[1:52:24]
much for productive study session.