Agenda
Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
These are YouTube's auto-generated captions, not a human transcript — expect occasional errors, especially with names and technical terms.
[0:05]
7:00 p.m. allow us to call the meeting
[0:08]
of the town of Chevy Chase Town Council
[0:10]
to order.
[0:13]
Please rise for the Pledge of
[0:14]
Allegiance.
[0:38]
We have a fairly straightforward program
[0:40]
for everyone this evening. As usual, we
[0:42]
will begin with general business. That
[0:45]
includes a financial report, the town
[0:47]
manager's report, and public comments.
[0:50]
And may I remind everyone that those
[0:52]
public comments should not regard either
[0:55]
of the public hearings that we're
[0:56]
holding today that follow the public
[0:59]
comments. And those hearings are about a
[1:01]
variance request from the residents of
[1:04]
7011 Hillcrest Place, as well as an
[1:07]
ordinance to amend the ADU regulations
[1:11]
in the town.
[1:12]
And finally, we will conclude the
[1:15]
evening with council discussions and
[1:16]
actions regarding a grant request from
[1:19]
Rosemary Hills Elementary School, as
[1:22]
well as
[1:23]
a discussion of an ordinance to amend
[1:25]
front yard hedge regulations. So, let's
[1:28]
begin. I'd like to turn it over to the
[1:30]
treasurer for our June financial report.
[1:33]
>> Thank you very much.
[1:35]
So, [clears throat] June is the end of
[1:37]
the fiscal year. So,
[1:39]
we finished the year in very good shape.
[1:42]
Um,
[1:43]
we received 110%
[1:46]
of the budgeted revenue for the fiscal
[1:48]
year. So, that's
[1:50]
5.5 [clears throat] million.
[1:52]
We had budgeted 5 million, so we
[1:54]
overachieved there.
[1:56]
On the operating side, we spent 96% of
[2:00]
our budgeted operating expenditures.
[2:03]
So, that's 3.8 out of about $4 million.
[2:06]
So,
[2:08]
um
[2:09]
it underspent, which is a good thing.
[2:11]
And then on the capital side,
[2:13]
>> [clears throat]
[2:13]
>> we spent 78% of what we had budgeted for
[2:16]
the year.
[2:17]
So, that's expenditures of 665,000
[2:21]
against a budget of about 853,000.
[2:25]
So, as we had been reporting for many
[2:27]
months now, we completed the fiscal year
[2:29]
comfortably within our budget.
[2:32]
A lot of details are available in the
[2:34]
packets that were sent around, but glad
[2:36]
to address questions if there are any.
[2:39]
I want
[2:41]
>> [clears throat]
[2:42]
>> Um I'm curious either
[2:44]
Carlo or Todd answer, how come we
[2:45]
underspent on our capital expenditures?
[2:48]
It looks like we did on street and
[2:49]
roads.
[2:50]
What happened there to cause us to spend
[2:51]
less than we anticipated?
[2:54]
>> We actually This doesn't represent a
[2:56]
full
[2:57]
This This is just a snapshot. We we
[2:59]
still have a lots of invoices coming in
[3:01]
specifically for capital improvements.
[3:03]
>> Okay.
[3:04]
>> Um so, this doesn't by any means
[3:06]
represent final. That won't be obviously
[3:08]
until the audit's performed. There are a
[3:10]
lot of expenses that will need to be
[3:11]
accrued that we're getting invoices for
[3:13]
and after after July 1st that will be
[3:17]
accrued to the prior fiscal year. We
[3:19]
have some outstanding invoices for
[3:21]
capital work, street and road repair,
[3:23]
concrete and and asphalt. Um so, this is
[3:26]
a snapshot of where we were as of the
[3:28]
end of June, but it doesn't account for
[3:30]
invoices that we're receiving for
[3:32]
expenses incurred in FY '26 that will
[3:35]
need to be accrued back to that fiscal
[3:37]
year.
[3:38]
>> So, do you think at the end we'll
[3:39]
probably be closer to our budget number?
[3:41]
>> I do.
[3:43]
>> Yeah, we just got invoices today for the
[3:45]
work we did on 27 and some springtime.
[3:48]
>> Okay.
[3:48]
>> All right.
[3:49]
8,000 plus year.
[3:52]
>> So, that brings Okay. But, we'll still
[3:53]
have a very healthy surplus for the year
[3:55]
then even if we do spend as we debate.
[3:57]
I'm always a little concerned if we
[3:59]
grossly underspend our capital budget
[4:00]
cuz [clears throat] you guys are careful
[4:01]
in estimating what needs to be done.
[4:04]
And I'm concerned whether something that
[4:05]
should have been done wasn't done. So,
[4:07]
>> I brought it to your [laughter]
[4:08]
attention cuz they bill us on time and
[4:11]
for the uh
[4:13]
>> You mean you call them up and say,
[4:14]
"Please, pretty please, will you bill us
[4:16]
as fast as possible?"
[4:17]
>> I do.
[4:18]
And [laughter] then you wait months
[4:22]
» Okay.
[4:23]
>> All right.
[4:23]
>> We have until the end of August. Yeah,
[4:24]
you you usually the end of August is
[4:26]
this is the uh
[4:28]
cut off for accruing expenses to the
[4:31]
prior fiscal. So, we have a long way to
[4:33]
go to make sure that all appropriate
[4:35]
expenses are accrued to the prior fiscal
[4:37]
year.
[4:39]
>> Okay. Thank you. That was my question.
[4:42]
>> [clears throat]
[4:45]
» But, that concludes uh
[4:48]
the financial report. Let's move over to
[4:50]
the town manager's report. Todd?
[4:52]
>> Thanks, Joy. I'll report on some uh
[4:54]
highlights, some initiatives undertaken
[4:56]
by town staff over the last month. Um
[5:00]
The I'll try to be brief and uh I'll let
[5:02]
you ask questions if you want more
[5:03]
information on any of these. The staff
[5:05]
communicated with Purple Line and
[5:07]
Montgomery County Department of
[5:08]
Transportation officials
[5:10]
about the shielding of of several lights
[5:12]
on the Capital Crescent Trail adjacent
[5:14]
to the town. Specifically, two lights uh
[5:17]
that are on the ramp from Elm Street
[5:19]
Park up to the bridge that crosses the
[5:21]
Purple Line tracks.
[5:23]
Um [clears throat] these are not
[5:24]
currently shielded. They're not They are
[5:26]
currently energized, but not
[5:27]
illuminated. And we feel they're going
[5:29]
to be disruptive to the adjacent uh
[5:31]
residents. Um we've been dealing with
[5:34]
this matter for quite some time.
[5:36]
We heard recently and dispositively
[5:39]
from MTA
[5:41]
uh that shielding will need to be done
[5:44]
in conjunction with the the
[5:45]
once the county takes ownership of the
[5:47]
Capital Crescent Trail.
[5:49]
Um
[5:50]
the county in turn
[5:52]
uh has said that they want to wait until
[5:55]
the lights are illuminated um to
[5:58]
determine how disruptive they may be,
[6:00]
what the impact may be, and what what
[6:03]
solutions there may might be effective
[6:06]
um once they take ownership of the
[6:08]
Capital Crescent Trail.
[6:10]
We understood that that might happen
[6:12]
simultaneous to the trail opening, but
[6:14]
that is still not certain. And there's
[6:17]
And then there's a process we have to
[6:18]
follow about submitting a permit to be
[6:20]
reviewed. And understanding that might
[6:23]
that process might take a long time,
[6:25]
we've reached out to our contacts at the
[6:28]
Department of Transportation
[6:30]
asking for their cooperation in in
[6:34]
determining a solution now uh that can
[6:36]
be implemented immediately after the
[6:38]
county takes ownership and the lights
[6:40]
are illuminated. Uh and our county
[6:42]
contacts said that they would review the
[6:43]
matter and the plans and specifications
[6:47]
and get back to us about the process and
[6:49]
options. And so we are waiting to hear
[6:52]
from them as to whether they're willing
[6:53]
to work with us now to find some viable
[6:55]
solutions that can be implemented
[6:58]
immediately after they take ownership
[6:59]
and the lights are illuminated.
[7:02]
Uh the staff also continued planning for
[7:05]
our automated speed camera program.
[7:09]
Automated speed enforcement program.
[7:11]
Uh we're continuing to look into options
[7:13]
and alternatives for uh
[7:16]
the town's access to this national
[7:18]
database of driver and vehicle records
[7:20]
so that citations can be issued to the
[7:24]
owner of record uh for a violation of
[7:27]
our speed camera that's to be uh
[7:29]
installed on Bradley Lane.
[7:31]
We're also looking into the review
[7:33]
process on our end and who that must be
[7:36]
done by and how that process will work.
[7:39]
Um and I will give you updates as that
[7:41]
proceeds through the summer as we
[7:43]
develop those plans and find out what
[7:45]
logistics and protocols we need to
[7:46]
follow.
[7:48]
Staff also met with Corso officials to
[7:50]
discuss and coordinate uh mobilization
[7:53]
efforts, tree removal, and construction
[7:56]
activities on the site.
[7:58]
The construction management firm is um
[8:01]
now moving forward going to provide
[8:02]
weekly updates um on their website and
[8:05]
directly to the town in the format that
[8:08]
I provided to the council this week. Um
[8:11]
we have we're distributing those
[8:13]
notifications to neighboring residents
[8:17]
uh or residents adjacent to the Corso
[8:19]
site and we're also posting them on our
[8:22]
Town Crier.
[8:24]
Staff, Dave in particular, oversaw the
[8:26]
completion of the CCST, the Capital
[8:29]
Crescent Surface Trail phase two work,
[8:32]
which is
[8:33]
done for all intents and purposes except
[8:35]
a few minor details that need to be
[8:37]
adjusted. Um
[8:39]
Uh we have been informed and that also
[8:42]
included the phase two work also
[8:43]
included some of the additional
[8:45]
improvements Dave wanted to make to
[8:47]
sidewalks and concrete over there. So,
[8:50]
uh we're happy that we were able to
[8:51]
coordinate with the county to make that
[8:52]
happen while they were doing these
[8:54]
improvements.
[8:55]
Uh we've been informed by the county
[8:56]
that phase three will begin this summer
[8:59]
and phase three consists of constructing
[9:03]
the connection from the improvements
[9:05]
they've done on 47th Street uh and Elm
[9:08]
Street Park to the actual Capital
[9:10]
Crescent Trail um under um
[9:14]
at the at the mouth of the park.
[9:17]
It also includes all the park
[9:19]
improvements that are going to take
[9:20]
place, which include multi-generational
[9:22]
playgrounds,
[9:24]
um retaining walls, berms, um and those
[9:28]
plans were reviewed and uh by by
[9:33]
residents and the community and the town
[9:35]
council uh number of years ago.
[9:38]
Uh the staff communicated with the State
[9:40]
Highway Administration about the
[9:42]
maintenance of the medians on
[9:43]
Connecticut Avenue, which are looking a
[9:45]
bit messy.
[9:46]
Um but also, and more importantly, uh
[9:50]
the status of Bradley Lane striping or
[9:52]
restriping to effectively shift the
[9:54]
lanes farther away from the sidewalk and
[9:56]
to the south.
[9:58]
We were told that work would be done in
[9:59]
June, uh which it wasn't.
[10:02]
Um and the response I received from the
[10:05]
District 3 engineer
[10:08]
was a bit arcane,
[10:10]
um but he said that he's trying to work
[10:13]
with the department doing the work to
[10:15]
stripe or restripe without having to
[10:18]
eradicate any lines at this time.
[10:21]
And he said he said he'll update me as
[10:22]
soon as he's able.
[10:24]
I I'm not sure what he means by that. Uh
[10:27]
I don't know how they can restripe and
[10:28]
effectively shift the lanes away from
[10:31]
the sidewalk with without restriping
[10:33]
or without at least re- eradicating the
[10:35]
existing lines. So, I'm going to need
[10:37]
more information and get more info from
[10:39]
him [clears throat] about what their
[10:40]
plans are, and he said he would provide
[10:41]
me details when he has them.
[10:44]
Um the town awarded uh we rebid our tree
[10:47]
maintenance and
[10:49]
landscape services contracts this past
[10:51]
spring, and we've just awarded those uh
[10:53]
those contracts to uh the most
[10:55]
responsible and responsive bidders,
[10:57]
which happen to be the ones we currently
[10:59]
have.
[11:01]
We've also increased stop sign
[11:02]
enforcement throughout the town
[11:04]
um based on resident uh complaints and
[11:07]
comments.
[11:08]
We've completed our inventory of street
[11:11]
signs for our town-wide replacement
[11:13]
project, and that might
[11:16]
bear pausing here for a second. We Dave
[11:18]
sent out an email to the council this
[11:20]
week asking for your feedback on the
[11:23]
design of these signs. At a previous
[11:25]
meeting, I think it was two meetings
[11:26]
ago, we had indicated um that we wanted
[11:29]
to use the new signs at Easton Leland
[11:32]
that were fabricated there to as a
[11:34]
template as the model for all the street
[11:37]
signs for this this town wide street
[11:39]
replacement project. Uh, but they then
[11:41]
sent out an email to the council this
[11:43]
week asking for concurrence on the
[11:46]
design whether it should include the
[11:48]
logo, uh, all caps,
[11:51]
sans serif fonts,
[11:53]
um, borders and colors and things like
[11:55]
that. Um, I think the majority if I'm
[11:57]
not mistaken Dave and you can correct me
[11:59]
came back and said
[12:01]
they liked the
[12:04]
lettering and the fonts and everything.
[12:05]
I think the issue and they I believe the
[12:07]
majority also wanted the logo, um,
[12:10]
put on the new street signs.
[12:14]
And
[12:16]
one of the reasons why we're using the
[12:18]
font we're using the sans serif font is
[12:20]
because it is the standard, um, of the
[12:24]
manual on uniform traffic control
[12:25]
devices.
[12:27]
Uh, that's the national bible if you
[12:30]
will for, uh, street signs and
[12:32]
everything related to traffic control.
[12:34]
So we're using what the standard bearer
[12:36]
is there as a sans serif font. It's more
[12:38]
legible, it's easier to read. It's, um,
[12:41]
and we're using all caps which we
[12:43]
currently have except on the serif font.
[12:45]
Um, we're using the border, um, and the
[12:49]
only issue I wanted to raise with the
[12:50]
council is the logo.
[12:52]
Um,
[12:53]
our recommendation is not to include the
[12:55]
logo even though a majority of you have
[12:58]
indicated that you'd like to use it and
[13:01]
my my reasons are, uh,
[13:04]
mult I have multiple reasons for, uh,
[13:06]
first of all I if the logo is currently
[13:08]
allowed illegible. You can't read it.
[13:11]
You don't know what it is or what it
[13:13]
says. The font is about as big as a
[13:16]
refrigerator magnet and the font I think
[13:19]
there's a 12 point font and a 10 point
[13:21]
font. No driver is ever going to be able
[13:24]
to see what that is or recognize what it
[13:26]
is when they're driving 20 miles per
[13:28]
hour throughout town. It's also a bit
[13:30]
distracting to the primary purpose of
[13:32]
street signs, which is for navigation.
[13:35]
We [clears throat] don't really have a
[13:36]
branding need in the town other than for
[13:39]
goodwill purposes. We don't have an
[13:41]
economic development component. But I
[13:44]
think I go back to the fact that
[13:47]
even if you can't read it, I wouldn't
[13:48]
make it any bigger because I still think
[13:49]
that logo is a bit distracting to the
[13:51]
primary purpose of of the signs, which
[13:53]
is for navigation.
[13:55]
And so our recommendation was to go with
[13:57]
the exact sign that's located at this
[13:59]
intersection of East and Leland, but
[14:01]
it's completely up to the council to
[14:03]
make that decision. And so I'll leave it
[14:04]
at that unless you want to have a larger a longer conversation about
[14:09]
that and to see in which direction we'd
[14:11]
like to go.
[14:14]
The town continued our overgrown
[14:16]
vegetation management program. We are
[14:18]
definitely seeing progress and
[14:20]
compliance
[14:21]
based on the letters we sent out the
[14:23]
original batch of letters we sent out.
[14:25]
We are addressing one issue in
[14:27]
particular, but all the rest have have complied, which we're happy to see.
[14:33]
Another very small batch of letters
[14:34]
recently went out
[14:36]
about some minor encroachments,
[14:39]
primarily overhead encroachments, and so
[14:41]
that program is actually going very
[14:43]
well.
[14:45]
The town submitted our closeout report
[14:47]
for our ARPA grant, so that's done.
[14:50]
And we've completed our application for
[14:52]
the balance of program open space funds
[14:54]
for for open space improvements, and
[14:56]
we're hoping to use those for the
[14:58]
improvements we're currently making to
[14:59]
the Thornapple Path.
[15:01]
Speaking of which, we've completed
[15:04]
hardscape modifications to the path
[15:07]
to address ADA accessibility issues, and
[15:09]
we've ordered a new ADA compliant gate.
[15:13]
The existing gate's there to prevent
[15:18]
bicycles and skateboards and things from
[15:20]
uh blowing through there for the time
[15:22]
being, but that gate should be installed
[15:24]
hopefully in the next month or so.
[15:27]
Uh we've continued to research
[15:28]
relocation of Bradley Lane fire
[15:29]
hydrants, and we've authorized a
[15:31]
topographic survey to be completed on
[15:33]
that to identify the locations of all
[15:35]
the existing improvements and the
[15:37]
boundaries of properties.
[15:39]
We procured a sprinkler system for
[15:40]
Zimmerman Park. We haven't had to use it
[15:42]
yet because we've had pretty good rain,
[15:44]
and the turf looks pretty good, but we
[15:45]
have that ready to deploy as needed. We
[15:49]
also procured a new sound system for
[15:50]
town events, which I understand went uh
[15:52]
was was
[15:54]
uh um
[15:55]
well received at the July 4th event. And
[15:58]
we provided project support to town
[16:00]
committees.
[16:02]
There's one other issue I want to raise
[16:04]
with you tonight that's sort of last
[16:05]
minute. It's an issue that Chevy Chase
[16:07]
Village has has approached us about. Uh
[16:10]
they are looking uh apparently a number
[16:13]
of their residents have
[16:15]
um [clears throat] have commented on how
[16:17]
successful and our our entry restriction
[16:20]
signs are how effective our entry
[16:23]
restriction signs are along Connecticut
[16:25]
Avenue um along all the intersecting
[16:28]
streets of Connecticut Avenue. All of
[16:30]
them have a do not enter 7:00 to 9:00
[16:32]
a.m. restriction on them.
[16:34]
And [snorts]
[16:35]
many [clears throat] residents comment
[16:36]
uh in the village commented on how well
[16:38]
ours worked, and they wanted the village
[16:40]
to consider the same entry restrictions
[16:42]
there.
[16:43]
Um
[16:45]
and the data that we collected in our
[16:46]
2020 study that was collected in 2019
[16:49]
pre-pandemic did suggest that they
[16:51]
worked pretty well. Um things have
[16:54]
changed obviously since that time, and
[16:57]
the village wanted to know if we would
[16:58]
be interested in a small cost sharing
[17:00]
arrangement since this study would
[17:02]
benefit not only them but us in so far
[17:05]
as we could determine where we would
[17:08]
want to uh deploy police or focus police
[17:12]
attention on those streets where um
[17:15]
violations of the entry restriction were
[17:17]
worse or are were
[17:20]
greater than others.
[17:22]
Um
[17:22]
I told Shayna that I would address this
[17:24]
with the council tonight. They're
[17:25]
looking at likely
[17:28]
undertaking the study
[17:30]
as soon as school
[17:32]
re- begins and they, you know, want to
[17:36]
move forward with awarding a contract to
[17:38]
get the contractor prepared to start
[17:39]
work as soon as as soon as school
[17:42]
reconvenes.
[17:44]
I do think it would be beneficial for
[17:45]
the town. The cost of the study is
[17:47]
$12,500.
[17:49]
Um so if we split it 50/50, it would be
[17:52]
60-6250
[17:54]
max the town would contribute but there
[17:56]
could be any cost split that we we'd
[17:57]
like to entertain.
[17:59]
But I do think it would be beneficial
[18:01]
for the town in so far as we could
[18:02]
target enforcement. It wouldn't be for
[18:05]
the purposes of making spot changes to
[18:08]
our traffic control
[18:10]
and entry restriction
[18:12]
signs because that's not what we want to
[18:15]
do any longer is to make spot
[18:17]
improvements. We want to do it
[18:18]
holistically.
[18:19]
» [snorts]
[18:19]
>> But it would be primary primarily for
[18:21]
the purpose of
[18:23]
targeted enforcement of those areas
[18:25]
where the violations are the worst.
[18:28]
And I think it would be helpful. It
[18:29]
would also be a very helpful to have
[18:31]
additional data.
[18:32]
You know, there are some claims often
[18:34]
that we don't have enough data and so
[18:36]
having that data
[18:38]
updated from 2019 would be very helpful
[18:41]
to refer to when a new study or any new
[18:44]
studies are done. And so I would
[18:46]
recommend that we the council approve a
[18:48]
50/50 split of that amount up to a up to
[18:51]
a maximum of 6250. And if you'd like to
[18:54]
do that tonight, you can entertain a
[18:56]
motion to do so as a supplemental
[18:58]
appropriation.
[19:00]
Um but that concludes the staff report.
[19:04]
» Thank you, Todd. Um I'd like to get some
[19:07]
input from my colleagues on that last
[19:09]
proposal regarding the conduction of a
[19:12]
traffic study.
[19:15]
Rich, do you have anything to say about
[19:16]
that, Mr. Transportation?
[19:19]
>> No, I I actually support it. I think it's for
[19:23]
the
[19:24]
6,000 little and change,
[19:28]
we get data to show how effective those
[19:30]
turning those uh
[19:33]
do not turn signs are. Um
[19:36]
And and and we have received complaints
[19:38]
that it's not working. So, I I I I think
[19:41]
just having data would be useful for us.
[19:44]
Um
[19:45]
and as Todd said that
[19:47]
anything else in the future, we could
[19:49]
always use that that could be a part of
[19:51]
something that's already been done and
[19:53]
we wouldn't have to pay for it again.
[19:54]
So, uh
[19:56]
I think that, you know, for $6,000, I
[19:58]
think
[20:00]
compared to what we paid for the last
[20:02]
traffic study is it's a it's quite a
[20:04]
deal. So,
[20:06]
I would [clears throat] I would endorse
[20:08]
we go ahead and
[20:09]
do, you know, let the
[20:12]
village go ahead and do the data
[20:13]
collection.
[20:17]
» Anyone else?
[20:18]
>> No, I think it makes sense.
[20:19]
>> Sure.
[20:20]
>> [clears throat]
[20:20]
>> Okay.
[20:21]
Tamar?
[20:21]
>> Is Rich offering a motion?
[20:23]
>> Uh well, we didn't hear from Tamar.
[20:26]
>> I I support it, too, but I do wonder
[20:28]
what is the nature of the data
[20:30]
collection? Does it compare to what was
[20:31]
done before? I mean, what would explain
[20:33]
the difference in cost?
[20:36]
>> Uh we we did a town Am I on mute? No,
[20:38]
I'm not. We did a town-wide study
[20:40]
before, Tamar. It was it was all about
[20:41]
cut-through traffic and and and and
[20:44]
traffic calming, but it was uh it was
[20:46]
town-wide. Uh it wasn't just about the
[20:49]
entry restrictions off Connecticut
[20:50]
Avenue.
[20:52]
And [snorts] um on second thought, we
[20:53]
don't need a supplemental appropriation.
[20:55]
This ma- nominal amount of money can be
[20:57]
taken up our out of our consultants and
[20:58]
engineers accounts under streets and
[21:00]
roads. So, there's no need for a
[21:01]
supplemental.
[21:03]
>> So, we don't need a motion, either?
[21:06]
>> You don't. If you could just approve the
[21:07]
work of uh uh um
[21:10]
>> [clears throat]
[21:10]
>> But I do think we all agree that this is
[21:12]
worth doing.
[21:14]
Thank you, Todd. We will accept your
[21:15]
recommendation. So, please proceed with
[21:18]
the cost-sharing arrangement with the
[21:19]
village uh to conduct a traffic study
[21:21]
along Connecticut Avenue.
[21:23]
>> Will do. Thanks.
[21:25]
Do you Would you like to discuss the
[21:26]
town street signs? I think probably
[21:29]
Dave, would you Can you inform the
[21:30]
council as to when that project will be
[21:32]
underway and when we need a decision
[21:34]
about the design of these signs?
[21:41]
» Yeah, I mean, uh there isn't really a
[21:42]
timetable for it. Um I was hoping to get
[21:44]
it started probably in the fall um and
[21:47]
finish it in the spring.
[21:48]
Um but we can certainly do all the prep
[21:50]
work and then it's just a matter of
[21:52]
ordering the signs and having them
[21:53]
installed. So,
[21:55]
um I'd like to keep it moving just cuz
[21:57]
I've got a little momentum on it, but
[21:59]
there's no
[21:59]
>> [clears throat]
[21:59]
>> deadline.
[22:01]
>> Maybe we can have some email back and
[22:02]
forth to resolve this question of the
[22:04]
logo.
[22:05]
>> Yeah, why don't we do that? Um and then
[22:06]
we can move on with this. But yeah, our goal then is to have this ready for
[22:11]
you, Dave, so that by the fall you can
[22:13]
move ahead.
[22:14]
>> Yep. Sounds great.
[22:15]
>> Okay.
[22:18]
Oh. Please, go ahead.
[22:20]
>> Todd, thank you for the report. And
[22:22]
couple questions, the um
[22:25]
trail-related. So, the phase two work
[22:28]
that is almost done,
[22:30]
when will that be put in service? Do you
[22:32]
have a a date for when that
[22:34]
is going to be available for public use?
[22:38]
>> The
[22:39]
uh yes, I the the plan now is to put it
[22:43]
in service this fall.
[22:46]
Whether the county takes ownership of it
[22:48]
simultaneously is uh
[22:51]
not an answer I have.
[22:54]
Um but it is to be put in service, a
[22:56]
portion of it is to be put in service
[22:58]
this fall.
[23:00]
Specifically, the portion between Elm
[23:01]
Street Park and
[23:03]
Barney, do you recall where it ends,
[23:05]
that portion where it will stop?
[23:08]
>> I don't. I don't. But I want to make
[23:09]
sure you're addressing
[23:11]
>> No, that was going to be my second
[23:12]
question.
[23:13]
>> I think he was asking specifically about
[23:14]
that little stretch on 47th Street
[23:17]
because there's still a a fence around
[23:20]
>> site.
[23:20]
>> Yeah.
[23:21]
>> Oh, I see what you mean. I still think
[23:22]
it's this
[23:23]
>> has been done. It all looks fine, but
[23:24]
you can't access the trail there.
[23:26]
>> I I believe it's still Yeah, this fall.
[23:29]
It will that that entire stretch along
[23:30]
47th and the connection they're building
[23:32]
this summer likely will all open in
[23:34]
order to connect to the CCT and the ramp
[23:37]
and the bridge this fall.
[23:40]
>> But the section between Willow and
[23:44]
Elm.
[23:45]
>> Yeah.
[23:46]
>> That work is done.
[23:48]
>> Why not take out
[23:49]
>> Why why are they leaving the fences
[23:51]
there so you can't use it? I just
[23:53]
>> Dave may know. Dave's overseeing the
[23:55]
work. Dave, do you know why the fences
[23:57]
are still there or what they're
[23:59]
continuing to do? Do you know? We can
[24:01]
ask, certainly, but
[24:02]
>> I I assume the parks department wanted
[24:04]
to wait till the grass got was growing,
[24:07]
but it's still in that. So I I have the
[24:09]
same question Carl has. Why not take up
[24:10]
the fence and allow people to,
[24:12]
you know, it's it's unsightly for one
[24:15]
thing, but it's also inconvenient.
[24:17]
>> Right.
[24:17]
>> I think they did the road striping. Um
[24:19]
they probably want to get all of those
[24:20]
in before they actually open it up to
[24:22]
make sure the crosswalks are safe.
[24:24]
Um which should be done probably the
[24:27]
beginning of next week. Uh but I'll find
[24:29]
>> Find out and I'll check on it.
[24:30]
>> out
[24:31]
all the details and
[24:32]
>> Okay.
[24:33]
Yeah, and then to the um question
[24:35]
that you were answering just that so I
[24:37]
can be clear.
[24:40]
Uh what I recall Let me
[24:42]
give some context. What I recall from
[24:44]
the
[24:46]
uh county announcement about the phase
[24:49]
three is the work, as you said, would
[24:52]
start this summer, but I think it was
[24:53]
scheduled to be finished next summer.
[24:57]
So that's when the connection to the
[24:59]
bridge would be complete.
[25:01]
And then I was wondering whether they
[25:03]
would open
[25:04]
the trail on the other side of the
[25:06]
bridge
[25:07]
ahead of the bridge being having a place
[25:10]
to land.
[25:12]
That's
[25:14]
if I'm being clear. I'm not sure that I
[25:15]
am.
[25:19]
» Uh
[25:21]
DBC, I'm opening the season I'm opening
[25:23]
a CCST phase reconstruction notice right
[25:26]
now.
[25:27]
And it says it's
[25:29]
the project will connect the existing
[25:30]
bike lane network in the intersection of
[25:32]
Bethesda Avenue and Wisconsin Avenue to
[25:34]
the northbound portion of the CCST,
[25:36]
which is part of the proposed Purple
[25:37]
Line project.
[25:39]
Phase three includes the project includes construction of
[25:43]
phase three A, a surface trail
[25:44]
connection at Elm Street Park to the
[25:46]
future Capital Crescent surface trail
[25:48]
near near the Air Rights building. In
[25:49]
phase three B, the construction of the
[25:51]
recreational improvements to Elm Street
[25:53]
Park.
[25:54]
Uh this includes but is not limited to a
[25:56]
playground, fitness equipment, and
[25:57]
playground resurfacing.
[26:00]
Um
[26:03]
My Sorry, this is only work.
[26:05]
Construction to begin summer 2026.
[26:09]
It doesn't give a time frame for
[26:12]
completion
[26:14]
on this notice.
[26:16]
Um
[26:17]
but I'm not sure Can you rephrase the
[26:19]
question or re
[26:20]
>> Yeah, so I I
[26:22]
My recollection is the announcement I
[26:24]
received in the mail
[26:25]
>> Right.
[26:26]
>> said that that work would start this
[26:28]
summer and finish next summer.
[26:32]
And as I understand it physically, until
[26:34]
that work is finished,
[26:37]
you can't get across You can't use the
[26:38]
bridge.
[26:40]
So, I'm wondering if if the trail is
[26:42]
going to be open
[26:45]
on the north side of the bridge ahead of
[26:49]
it
[26:50]
being able to connect to the bridge in
[26:52]
the phase three work that we're
[26:53]
discussing.
[26:54]
>> I don't know the answer to your
[26:55]
question, but I can find out.
[27:00]
» Follow up. Let me ask a follow-up
[27:01]
question to that.
[27:02]
I had not seen that notice you just
[27:04]
referred to, Carlos, so thank you for
[27:05]
mentioning it. Um, what separates 3A
[27:09]
from 3B?
[27:11]
Um,
[27:13]
I would be really surprised if 3A,
[27:15]
meaning just that
[27:17]
100-yard connection
[27:19]
from the corner of Willow and Elm to the
[27:22]
portal
[27:23]
would take 12 months to do.
[27:26]
That would really be pretty surprising.
[27:28]
It's not impossible this county could
[27:30]
take that long, but I'd be surprised.
[27:32]
And if that were to be the case,
[27:35]
then that
[27:36]
completely blows away
[27:39]
all of our efforts to try to get that
[27:41]
bridge open this fall
[27:43]
uh, because that's what we wanted for
[27:45]
the kid our kids to be able to walk to
[27:46]
BCC
[27:48]
more on a more more on a more direct
[27:50]
path and without without going out to
[27:52]
Wisconsin. Um, so I think trying to get
[27:56]
clarity on whether that 12-month
[28:00]
period is for
[28:02]
just 3A, or does that really also
[28:04]
include 3B, meaning the development and
[28:07]
the construction of the three different
[28:09]
recreation areas, uh, playground areas.
[28:12]
I 12 months for all of that is plausible
[28:15]
to me, but I would like to think that
[28:17]
they could do 3A
[28:21]
within a couple of months. I mean, it
[28:22]
didn't take them very long, well, longer
[28:24]
than it should have, but they're still
[28:25]
within a couple months they built the
[28:27]
link along 47th Street and
[28:30]
3A is a shorter distance.
[28:32]
So, is that something you could track
[28:34]
down, Todd, and try to hone in on that
[28:36]
or just what they wrote? Because
[28:37]
otherwise there's a huge disconnect
[28:39]
in all of our discussions about trying
[28:41]
to get that bridge open this fall, and
[28:43]
now having an announcement that they
[28:45]
won't finish it till next summer.
[28:46]
>> Yeah, happy to.
[28:48]
>> Okay, thank you.
[28:53]
» [laughter]
[28:57]
» Never a dull moment.
[28:59]
Okay, let's move on to public comments.
[29:01]
Um, we're happy to take comments from
[29:03]
anyone here in the room or online. Uh,
[29:06]
but
[29:08]
please hold your comments if they regard
[29:10]
either the variance request for 7011
[29:13]
Hillcrest Place or the ordinance on ADU
[29:17]
regulations. Do we have any public
[29:19]
comments?
[29:24]
Going once.
[29:27]
Going twice.
[29:29]
No public comments this evening.
[29:32]
Okay, let's move on to the second part
[29:34]
of our program. And the first item on
[29:37]
the agenda is a public hearing for the
[29:39]
variance request of 7011 Hillcrest
[29:43]
Place.
[29:44]
Um, I'm going to turn this over to the
[29:46]
town attorney, Ron Bolt, to introduce
[29:49]
this for us. Thank you.
[29:51]
>> Thank you. Yes, this is the application
[29:53]
of Kevin and Mary Love for a FAR, floor
[29:57]
area ratio, variance of 100 square feet
[30:01]
to accommodate a second story addition
[30:04]
in a
[30:05]
rear screen porch to be built on an
[30:07]
existing deck.
[30:10]
The hearing will begin with the
[30:11]
applicant's case, and the applicant can
[30:13]
please note that the council has had the
[30:16]
opportunity to review your materials in
[30:18]
advance, so you don't need to restate
[30:20]
everything in there, but please feel
[30:22]
free to address what you'd like.
[30:25]
After that,
[30:27]
the council members will ask their
[30:29]
questions of staff and/or the applicant.
[30:32]
Following that, if there's anyone else
[30:34]
attending the hearing tonight that wants
[30:35]
to make a comment or ask a question,
[30:37]
you'll have the opportunity to do so.
[30:39]
Then the applicant will be be given a
[30:41]
rebuttal period if necessary.
[30:45]
The record will then close and the
[30:46]
council will deliberate and entertain a
[30:49]
motion directing me to prepare a written
[30:51]
decision either approving or denying the
[30:54]
request. Please note that if the request
[30:56]
is approved, it's not final until it's
[30:59]
been written up and that's usually a
[31:02]
process that takes about a week or two
[31:04]
and you can't get your permit till
[31:07]
that variance decision has been issued.
[31:11]
Before anyone speaks, we ask that you
[31:14]
please wait until you're identified by
[31:17]
the mayor for purposes of the recording
[31:20]
so that we don't have multiple people
[31:21]
speaking at once.
[31:23]
Please identify yourself by name and
[31:25]
address
[31:27]
and I'll note for the record that we've
[31:29]
received two letters in support of the
[31:31]
request.
[31:32]
One from Beth Tomasello and David Keto
[31:35]
who are confronting neighbors across the
[31:37]
street and another letter from Ashley
[31:40]
McIntosh. I do not know where she
[31:43]
resides but perhaps Miss Love can let us
[31:46]
know if she knows. And then we also got
[31:48]
a call in support from Stephen Canter on
[31:51]
Sycamore.
[31:53]
And those are in the record. So with
[31:55]
that, turn to the applicant. Now please
[31:57]
come up to the the microphone stand if
[31:59]
you would.
[32:01]
Yes, thank you.
[32:08]
» [clears throat]
[32:09]
>> All right. So Mary Love, I'm the uh
[32:13]
the the the one of the two people for
[32:15]
the application and essentially what we
[32:18]
are trying to do is create a master
[32:21]
bath. I see Carlos a tall man over
[32:24]
there. My husband is a tall man and our
[32:26]
current master bath is under a gambrel
[32:28]
roof so he cannot stand upright in our
[32:31]
shower. So we felt like after
[32:34]
two or three years in in house, we're
[32:35]
going to uh
[32:37]
give us more than a 5 by 5 ft shower
[32:39]
that he might be able to stand upright
[32:41]
in. And so, what we're planning on doing
[32:44]
for our
[32:45]
hopefully our construction,
[32:47]
and it's okay that we won't get this for
[32:49]
a week because we have paused on
[32:51]
engineering until we get your blessing,
[32:53]
is our first floor has a bathroom that
[32:56]
was added, I think, in the '70s. So,
[32:59]
essentially what we want to do on the
[33:00]
second floor is build a bathroom
[33:02]
directly above that. I wouldn't call it
[33:05]
extravagant or large.
[33:07]
You know, it'll be a shower, a toilet, a
[33:09]
vanity for both of us. And then, we have
[33:11]
an existing porch in the back of our
[33:14]
house. And so, our goal was always to
[33:18]
screen it in. Just I'm sure you guys
[33:20]
have been outside today. I think the
[33:21]
mosquitoes have come out with a
[33:23]
vengeance.
[33:24]
My poor children are covered in bites.
[33:26]
Our thought is, you know, we want some
[33:29]
sort of outdoor living space that we can
[33:30]
actually enjoy during the summer. And
[33:33]
then, the last thing we're going to do
[33:35]
with this project, I I don't know if it
[33:37]
even needs to be addressed, but our
[33:39]
front stoop is failing after a mere 100
[33:42]
years. So, we're going to give that a
[33:43]
bit of a face-lift.
[33:48]
» Thank you.
[33:49]
Does anyone have any questions for Mrs.
[33:51]
Love?
[33:55]
Do we have any comments from anyone here
[33:58]
in the room or anyone online regarding
[34:00]
this variance request?
[34:04]
» Guys, I have a microphone. I want to
[34:06]
talk a little longer. Now, I'm just
[34:08]
kidding.
[34:10]
>> [laughter]
[34:10]
>> I I just unmuted, but I don't know if
[34:13]
it's my turn to speak.
[34:15]
>> It It is. Could you please identify
[34:17]
yourself and your address?
[34:19]
>> Yeah, hi. My name is Brian Steel. My
[34:22]
wife, Jessica, and I recently purchased
[34:25]
4104
[34:27]
Sycamore Street, which is immediately
[34:30]
adjacent to the north of the Love's
[34:33]
property. So, we're at the corner of
[34:35]
Hillcrest and Sycamore.
[34:37]
And
[34:38]
we're So, we're familiar with the layout
[34:40]
of that end of the street. And I think
[34:43]
that this modification would
[34:45]
be a meaningful enhancement to the
[34:48]
Love's home and entirely in keeping with
[34:53]
what else has happened and is happening
[34:55]
in that area.
[34:56]
Um in in all respects. Um so, we are
[34:59]
supportive of their plans and
[35:02]
look forward to Mr. Love being able to
[35:04]
stand up straight in the shower.
[35:07]
>> Thank you, Brian.
[35:10]
Thank you for that comment. Do we have
[35:12]
any other comments or questions about
[35:14]
this variance request?
[35:25]
Do we have any comments from staff?
[35:30]
Would the council like to deliberate
[35:32]
about this variance?
[35:34]
>> I'll make a motion to approve the
[35:35]
variance.
[35:36]
>> Second. [clears throat]
[35:38]
>> All in favor.
[35:39]
>> I.
[35:42]
>> [clears throat]
[35:42]
>> Wonderful.
[35:43]
>> Thank you.
[35:45]
>> Were you expecting a more more drama?
[35:47]
I'm sorry to disappoint you.
[35:49]
>> [laughter]
[35:55]
» Brian, would you please the app Please
[35:58]
advise the applicant of what comes next.
[36:01]
>> Yes, so now I'll draft the decision and
[36:03]
I'll circulate it to the council for
[36:06]
approval. And once that's been signed by
[36:08]
the mayor, you can get your permit and
[36:11]
usually about a week or two to to get
[36:13]
that decision written and approved.
[36:18]
And then Dave will let you know once the
[36:20]
decision's ready and you can get your
[36:22]
permit.
[36:25]
» Right. All right. On to the discussion
[36:28]
of and the public hearing.
[36:29]
>> Excuse me, may I make a quick comment?
[36:31]
>> Yes.
[36:31]
>> Um
[36:32]
as a liaison to the land use committee
[36:33]
this coming year, um
[36:35]
there are a number of issues in our code
[36:37]
that uh like to have taken up and I'm
[36:39]
talking to Dave about. And I'd like to
[36:41]
add this to one as to sort of the
[36:43]
question of whether a screened-in porch
[36:45]
should be counted as part you know,
[36:46]
inside the FAR. Uh and I think that's a
[36:49]
legitimate question for us to ask and
[36:51]
I'd like deliberation because uh
[36:53]
I and I many, many years ago I pushed
[36:56]
hard to change our code so people could
[36:58]
build by right a front uh
[37:02]
a front porch out 9 ft instead of only 3
[37:06]
ft. I felt that was reasonable.
[37:09]
Uh and and uh we also learned that that
[37:11]
only applied to the porch floor but not
[37:13]
the porch roof seal the ceiling for the
[37:15]
porch. So, anyway, there are going to be
[37:17]
a number of issues that we want to take
[37:19]
up. Uh I might add also the one that we
[37:22]
dealt with last time dealing with the
[37:24]
restriction on
[37:26]
um retaining walls having to be 2 ft
[37:28]
back and whether that should be scaled
[37:30]
so that a low wall doesn't have the same
[37:32]
requirement as a high wall would. So,
[37:34]
anyway, we'll be taking up a lot of
[37:36]
these issues over the course of this
[37:37]
coming year and hopefully coming back to
[37:39]
the council for the discussion.
[37:41]
>> Terrific. Timbrook.
[37:43]
>> With there also um was there also the
[37:46]
issue of the roof over the the stairway
[37:49]
to the basement, the outdoor stairway to
[37:51]
the basement?
[37:51]
>> was another one. Thank you for
[37:52]
mentioning that. Is that on the on your
[37:54]
list? It's on the list. Okay.
[37:57]
>> [laughter]
[37:58]
>> Great.
[37:59]
You sound like the character from the
[38:00]
Mikado. What's the you know, the has the
[38:03]
list of all the people in
[38:06]
>> He's got a little list.
[38:08]
Um okay, ordinance to amend the ADU
[38:12]
regulation. Um this is a open public
[38:15]
hearing. Um Ron, I'm going to turn to
[38:18]
you again to
[38:20]
start us off on that.
[38:21]
>> Yes. So, as everybody is aware
[38:25]
in the General Assembly regular session
[38:27]
for 2025, a law was passed
[38:31]
providing that local jurisdictions,
[38:35]
including the town,
[38:36]
have to promote accessory dwelling units
[38:40]
by affording them the same setbacks as
[38:44]
other accessory buildings. So, that law
[38:46]
provides you cannot impose on an
[38:48]
accessory dwelling unit like a you know,
[38:51]
granny pod or the like, a setback that's
[38:54]
larger than what you require for sheds,
[38:57]
detached garages, and other accessory
[38:59]
buildings. The town code currently has
[39:02]
different setbacks for different types
[39:05]
of accessory buildings.
[39:07]
And so, this ordinance would eliminate
[39:10]
the stricter setback for detached
[39:12]
accessory dwelling units, and it'll
[39:14]
apply the same setback to all accessory
[39:17]
buildings.
[39:18]
There is currently in the code the
[39:20]
setback modifier that is similar to the
[39:23]
county's. So, where an accessory
[39:25]
building is taller than 12 ft or longer
[39:29]
than 24 ft,
[39:31]
an additional setback applies for each
[39:34]
additional foot over those thresholds.
[39:37]
So, the proposal is to rely on that existing setback modifier to uh
[39:44]
prevent the looming of accessory
[39:46]
buildings over the neighbors.
[39:48]
Uh the state law provides that we have
[39:51]
to adopt the law before October of 2026.
[39:56]
Uh this is why we are doing it now. And
[39:59]
the ordinance has already been
[40:01]
introduced, and as the mayor noted, it's
[40:03]
on the docket tonight for a public
[40:05]
hearing. And following the public
[40:07]
hearing, if the council so wishes, there
[40:10]
can be a motion to adopt that ordinance.
[40:18]
» Do we have any discussion of this
[40:20]
particular ordinance?
[40:26]
Do we have any comments from the public
[40:28]
either online or here in the room
[40:30]
regarding the ADU regulation?
[40:37]
» Hi, this is D. Harris.
[40:40]
Is this time for
[40:42]
>> Yes, yes, we
[40:43]
>> speak briefly?
[40:45]
>> Thank you. You can comment about this.
[40:46]
D, what is your address, please?
[40:48]
>> Yeah, 4428 Ridge Street.
[40:53]
» Go ahead.
[40:54]
>> Yeah, I just
[40:56]
the adjustments to the regulations look
[40:58]
eminently reasonable to me and I'm glad
[41:01]
that the town is taking care of this on
[41:03]
a timely basis. My only request is to
[41:08]
I don't know whether this can happen in
[41:10]
tonight's discussion or not, but I think
[41:13]
it would help to
[41:15]
um
[41:16]
clarify somehow
[41:18]
uh
[41:21]
when I read through the proposed um
[41:24]
ordinance, there was discussion of the
[41:27]
ability to
[41:29]
um
[41:31]
maintain,
[41:33]
uh modify, and I can't remember the
[41:35]
exact words, but maintain, modify, and
[41:39]
um
[41:40]
>> repair there you go,
[41:42]
existing buildings. Um and I was
[41:45]
interested out whether there's any
[41:48]
adjustment or where one can find out
[41:51]
information about what kind of
[41:54]
permitting is necessary in order to
[41:56]
repair, modify, or
[41:59]
uh you know, all of those things. That's
[42:02]
just more more of a question than a
[42:04]
comment, but it seemed relevant to
[42:08]
um
[42:09]
make sure that people know.
[42:17]
Just yes.
[42:20]
Yeah, Dave can correct me if I'm wrong,
[42:22]
but I believe no permit is needed for
[42:25]
ordinary repairs either at the town or
[42:29]
the county level.
[42:32]
Um, but if you are
[42:35]
and let's say ripping off the siding and
[42:37]
putting on new siding, then a permit is
[42:39]
required in order to confirm compliance
[42:42]
with with setbacks, but yeah, Dave can
[42:44]
correct me if I'm wrong there.
[42:47]
» Yeah, the yeah, the short answer is
[42:49]
there's
[42:50]
you know, some discretion or that needs
[42:52]
to be applied as to when a repair turns
[42:54]
into a replacement. Um, so, you know, I
[42:57]
can certainly meet you out there to take
[42:59]
a look at it. Um,
[43:00]
if you have a specific question and
[43:02]
generally as long as the
[43:03]
three-dimensional shape of the building
[43:05]
is not changed and it's maintained
[43:07]
during the course of the construction,
[43:10]
um, we consider that to be a repair
[43:12]
and does not require a permit.
[43:14]
>> And new doors for example on on a
[43:17]
dilapidated building is not a is is just
[43:19]
a repair, yes?
[43:20]
>> That is just a repair, yeah. Yeah, new
[43:22]
siding can go up. Um, you know, if the
[43:24]
roof rafters are are rotten, as long as
[43:26]
the structure itself is maintained and
[43:29]
they're replaced in the same dimension,
[43:31]
that's a repair, so so we're pretty
[43:33]
flexible.
[43:34]
>> Okay, great. Thank you thank you very
[43:35]
much.
[43:40]
Do we have other comments or questions
[43:42]
regarding this ordinance?
[43:54]
I think it's a worthy effort. We need to
[43:56]
be in compliance with county law.
[43:59]
Um,
[44:00]
this probably doesn't materially change
[44:02]
the existence of any other dwellings in
[44:04]
the town.
[44:06]
So, Ron, at this point, is it up to us
[44:09]
to make a motion to approve this
[44:10]
>> Yes.
[44:11]
>> ordinance?
[44:11]
>> That's right. Yeah, and then the
[44:12]
ordinance will take effect on
[44:14]
August 7th, 2026.
[44:18]
Uh we were required to give the County
[44:20]
Council notice, which we did.
[44:23]
Under state law, the county has the
[44:25]
opportunity to provide comments
[44:27]
on our building regulations. They did
[44:28]
not provide any comments.
[44:32]
» Very good. Do we have a motion?
[44:35]
>> I'll move [clears throat] approval of
[44:37]
the ordinance to amend the front yard
[44:39]
hedge regulations.
[44:42]
>> [laughter]
[44:43]
>> This is for the accessory dwelling units
[44:46]
ordinance.
[44:49]
Sorry. I I was still I'll move approval
[44:52]
for the accessory dwelling unit
[44:53]
regulations.
[44:57]
» All in favor.
[44:58]
>> I.
[45:02]
» Thank you very much. Now, we're moving
[45:04]
on to the third part of our program this
[45:06]
evening, and that is council discussions
[45:09]
and actions.
[45:10]
And we're going to start now with a
[45:12]
discussion of
[45:14]
the ordinance to amend front yard hedge
[45:17]
regulations.
[45:19]
Over to you, Ron.
[45:21]
>> Okay.
[45:23]
So,
[45:25]
the council will recall that
[45:28]
there's a strange result from application of our front yard hedge requirement, which
[45:35]
prohibits
[45:37]
hedges in a front yard exceeding 3 ft.
[45:40]
And it was noted that with respect to a
[45:43]
particular property,
[45:45]
that resulted in an overly restrictive
[45:48]
situation because the grade of that
[45:50]
property is lower than the street, and
[45:52]
so you can and you could have a 5-ft
[45:55]
hedge that's completely not visible from
[45:57]
street level, but because we say they
[45:59]
can be no taller than 3 ft,
[46:01]
uh those hedges would be prohibited. So,
[46:04]
this ordinance would amend the
[46:05]
regulations to provide that we're going
[46:07]
to measure the height of the hedge from
[46:09]
the surface of the grade of adjoining
[46:11]
ground or the grade of the nearest
[46:14]
public sidewalk
[46:16]
or the curb or edge of the street you
[46:19]
know when in circumstances where that is
[46:23]
uh
[46:24]
higher
[46:25]
than the uh actual elevation of the
[46:27]
yard.
[46:31]
And so, this has has
[46:36]
Let's see.
[46:40]
» Was that the tool public hearing in May?
[46:43]
>> Okay, thank you. Yeah, I couldn't
[46:45]
remember why we're in discussions
[46:46]
instead of public hearings. Thank you,
[46:47]
Todd. Yeah, so we've already had the
[46:49]
public hearing on this one. This one is
[46:51]
ready for
[46:52]
a motion to adopt unless there are
[46:55]
discussions or amendments.
[46:57]
>> I gave this to [clears throat] the
[46:58]
council, so.
[47:01]
>> Notice was also given
[47:03]
>> I'm sorry, Todd.
[47:04]
>> Notice was also given to the county and
[47:06]
they had no comments.
[47:07]
>> Yes, thank you.
[47:09]
>> Okay, so
[47:11]
do we have a motion?
[47:14]
Do Are we Is there any more discussion
[47:16]
on this matter?
[47:19]
>> I just wondered, are we supposed to open
[47:20]
it up for discussion from the public? Is
[47:23]
this a public hearing?
[47:25]
>> We had the public hearing. We had the
[47:27]
public hearing already and we didn't
[47:29]
have the appropriate notice period to
[47:31]
the county, which is why we
[47:34]
this time are you know why we shifted
[47:36]
the vote to this meeting.
[47:38]
>> Right.
[47:39]
>> So, if there are no other discussions
[47:42]
or comments from the council regarding
[47:44]
this ordinance, do we have a motion?
[47:49]
» I'll start.
[47:50]
All in favor?
[47:51]
>> Aye.
[47:55]
» Very good. Um
[47:57]
Finally, uh
[48:00]
Katie,
[48:01]
we are ready to hear
[48:03]
a presentation from the PTA the Rosemary
[48:06]
Hills Elementary School PTA regarding a
[48:08]
grant request that they made last year
[48:10]
for
[48:12]
the Rosemary Hills Elementary School
[48:14]
outdoor classroom project.
[48:16]
>> Hi everyone.
[48:19]
Hello south.
[48:22]
So I don't want to be repetitive, but I
[48:26]
can give a brief summary of where we
[48:28]
started and where we are if that's
[48:30]
helpful. I'm Katie Bale.
[48:33]
I'm the executive vice president now at
[48:36]
the Rosemary Hills PTA
[48:39]
and I'm still stewarding this along
[48:42]
after a long year of discussion with the
[48:45]
county and waiting. Um
[48:47]
and I'm grateful for
[48:50]
the interest and support here. So the
[48:53]
where we started was with a proposal
[48:55]
that I did
[48:58]
researching and talking to companies
[49:00]
about costs and um what we thought as an
[49:04]
estimate would be of the work and at the
[49:07]
time the main consideration was increased
[49:12]
shade for the space which I know you
[49:14]
went and I think you went and saw
[49:16]
recently. Rebecca told me that you made
[49:18]
a quick little visit. Thank you for
[49:20]
doing that. Um
[49:23]
and to reduce maintenance. So up front
[49:26]
it cost a little bit more in order to
[49:28]
put some pavers in and get rid of some
[49:31]
of the mulch and so our original idea
[49:34]
was to get some sort of shade sail back
[49:37]
there to allow for children to be out
[49:40]
there without being roasting cuz there
[49:42]
really isn't shade back there and then
[49:45]
to kind of get rid of these big beds
[49:47]
that required a lot of mulching where
[49:49]
the PTA was spending thousands of
[49:51]
dollars just to get it weeded.
[49:55]
And so
[49:56]
we brought this to the principal. She
[49:58]
brought it to the district. We finally
[50:00]
got up in the queue for uh discussion
[50:03]
and um
[50:05]
met with them in the spring and they had
[50:08]
some really great suggestions about how
[50:10]
to modify the project to both make it
[50:12]
more cost-effective and also just easier
[50:16]
to
[50:17]
um maintain long-term. Like for example,
[50:20]
a shade sail is lovely, but
[50:22]
if it were to rip or break, it's just
[50:25]
it's a onerous both financially um
[50:29]
and just uh
[50:31]
for the county to deal with. So, having
[50:34]
the umbrellas with the tables and
[50:37]
getting a tree installed that's going to
[50:40]
grow into a big shade tree would be more
[50:42]
cost-effective and just easier to
[50:45]
maintain, which really is aligns well.
[50:48]
And we've had really great discussions
[50:50]
with the county on this. They've been a
[50:53]
great partner in seeing what we wanted
[50:55]
to do, providing us input on what other
[50:57]
schools have done.
[50:59]
Um and so that's brought the cost down,
[51:02]
which [clears throat] is great. So,
[51:03]
we're kind of closer to about 50,000 as
[51:06]
opposed to 65,000,
[51:08]
which uh is on account of
[51:11]
the shade sail not being in there and um
[51:14]
the tree that will go in. They have a um
[51:18]
partnership with a local nursery where
[51:21]
we can get free trees and they've
[51:23]
already done that up
[51:24]
on the um
[51:26]
the playground side, which is lovely cuz
[51:28]
we also don't really have shade on the
[51:31]
playground. So, at recess, even when
[51:33]
it's only like 75 out, it can feel quite
[51:35]
warm. So, they've planted a bunch of
[51:37]
river birch trees along the perimeter
[51:40]
there
[51:42]
um that will grow fast and provide more
[51:44]
shade for the kids when they're out
[51:46]
there for recess.
[51:48]
Um
[51:49]
So, that
[51:50]
Now, we have approval from uh the
[51:52]
district. We have a approved contract um
[51:57]
and they've started clearing the space.
[52:00]
We received our $10,000
[52:02]
um commitment uh from Section 5 this
[52:06]
week that came in the mail. Uh Section 3
[52:09]
is having their meeting tonight and
[52:11]
she's going to get the signatures on
[52:13]
that check.
[52:14]
Um and so, we're very We're in very good
[52:18]
shape to make this happen and be
[52:20]
completed um by the time school starts,
[52:22]
which is really exciting. So, right now
[52:25]
the main project is um
[52:28]
clearing the space and getting it ready
[52:30]
uh and that will be done in the coming
[52:33]
weeks and they'll be out there watering
[52:35]
the sod and uh taking care of that. And
[52:37]
then the second part uh will be
[52:40]
purchasing some of the educational
[52:42]
items. So,
[52:43]
um that's kind of where we are. I can
[52:46]
talk more specific if you like, but um
[52:50]
you know, just again incredibly
[52:51]
grateful. And I also just want to say
[52:53]
thank you again uh for that opportunity
[52:57]
to come because when I spoke last year,
[52:59]
it resulted in a in a different donation
[53:02]
cuz I also talked to you about our food
[53:04]
pantry and we got a $2,000 donation from
[53:09]
um a resident who has a family
[53:11]
foundation and has supported the BCC
[53:13]
food pantry. And so, this year we were
[53:16]
able to have
[53:18]
I think six or seven um market days and
[53:21]
had about 15 families each time and the
[53:24]
money that we received from them
[53:26]
enabled us to replenish it throughout
[53:29]
the year and really had a lot of
[53:30]
community buy-in. And so, now we have a
[53:33]
plan next year to do more and um engage
[53:38]
our families on participating in um
[53:42]
contributing toward it. So, it's really
[53:45]
exciting and we have a teacher who's um
[53:48]
son is going to start there next year.
[53:49]
She lives over in section five and she's
[53:51]
going to be sort of like our in-house
[53:54]
liaison to enable people to sort of go
[53:56]
more on demand. Um so, I just I really
[53:59]
thank
[54:01]
the opportunity not just to talk about
[54:02]
the outdoor classroom, but other ways
[54:04]
that we ended up helping the community.
[54:06]
So, thank you so much. I really
[54:08]
appreciate it. Um I'm happy to answer
[54:11]
question.
[54:13]
>> Certainly, go right ahead, Bonnie.
[54:14]
>> Yeah, thank you. Um
[54:16]
when we made [clears throat] this
[54:17]
appropriation, we gave 10,000 outright
[54:20]
and we'd give another 10,000 if matched.
[54:22]
>> Yep.
[54:22]
>> We made it clear that we the match would
[54:25]
not apply to governmental sources of
[54:27]
fund funding.
[54:28]
>> Yep.
[54:28]
>> But, we also made clear that the match
[54:30]
would apply for donations otherwise from
[54:33]
anywhere. It didn't have to be from
[54:34]
within the town.
[54:35]
Um and so, I really like a little bit of
[54:38]
clarification here regarding your your
[54:41]
comment in your memo that the PTA can
[54:43]
complete the match.
[54:45]
>> We would
[54:46]
>> Is that effectively from other donations
[54:47]
from families and individuals?
[54:50]
>> We have enough money in hand to do that.
[54:52]
We wanted to contribute a part
[54:55]
to it as well and I
[54:58]
I'm been the treasurer and we've had a
[55:00]
really strong year of
[55:03]
fundraising again, probably more than I
[55:05]
thought and part of that is we had an
[55:07]
incredible
[55:09]
uh response to our food drive in the
[55:12]
fall and we received
[55:15]
$12,000
[55:17]
from the community to provide food that
[55:20]
I thought we were otherwise going to
[55:21]
have to do out of our own PTA budget.
[55:23]
So, we both provide food and uh gift
[55:27]
cards. So, we um we didn't have to pull
[55:30]
into our money as much. So, we
[55:32]
>> Wait, wait, wait, wait. I'm sorry. Let
[55:33]
me Let me clarify. So, uh when you're
[55:35]
suggesting if we could use the PTA
[55:38]
contribution as part of the matching
[55:40]
that would draw the additional money
[55:41]
from our office.
[55:43]
>> If you were amenable to
[55:44]
>> is that where does that where does that
[55:46]
PTA money coming from?
[55:48]
>> That comes from just our donations.
[55:50]
>> Donations from families to the PTA.
[55:53]
>> right. That's right.
[55:54]
>> okay. So that not from
[55:56]
>> the auction or no, no, no. It's not from
[55:59]
It's not a match from the I'm sorry. No, no. It This is because
[56:04]
like I said, I thought we would be more
[56:06]
encumbered and helping cuz we had 30
[56:08]
families that we were planning for and
[56:10]
then we had 60 and I thought, okay,
[56:12]
well, then we're really going to have a
[56:14]
lot more to spend there, but between
[56:19]
community donations and um
[56:21]
other things, we were able to cover
[56:23]
that. So we have a little bit more than
[56:25]
I expected in funds that came
[56:28]
from our annual fund, spirit wear sales,
[56:31]
rhino run, all things that are
[56:32]
contributed from the community.
[56:34]
>> I need to know. Okay. Um so the other
[56:36]
question is this. In terms of the
[56:38]
budget, you are still looking to get
[56:40]
um
[56:42]
your base I'll round it up to 50,000,
[56:44]
right? Okay. And
[56:47]
to get to the 50
[56:49]
what I see here is 13 from section 3, 10
[56:52]
from section 5
[56:53]
are committed 10. So that's 33,000.
[56:58]
Another if you count if you're only at
[57:00]
the 2788 and only count of that, that
[57:03]
would yield
[57:04]
and then we would match that. Okay. So
[57:06]
that's another 5,500 or thereabouts. So
[57:09]
you're only at around 38,000.
[57:11]
On the other hand, if we permitted the
[57:13]
PTA match to be included then the town
[57:16]
would put in a full additional 10, you'd
[57:18]
have that other 10.
[57:20]
So then you would have
[57:21]
13 plus 10
[57:24]
plus 20 from us plus another 10.
[57:27]
So 13 23 Um
[57:31]
uh
[57:32]
53. you're much closer to actually what
[57:35]
you need. Is that I
[57:36]
>> That's right.
[57:37]
>> Am I correct in those numbers?
[57:38]
>> That's That's right. That's right. We
[57:40]
We're coming in where we're in a very
[57:42]
strong position and any overage, I have
[57:45]
a commitment from section three to
[57:48]
um
[57:49]
provide that if something were to come
[57:51]
up unexpected. Um and so I feel very
[57:54]
confident that we can
[57:57]
um put it all together. I mean, the the
[57:59]
money that we have
[58:00]
>> Sorry to interrupt, but I just want to
[58:01]
be clear. It seems to me that
[58:03]
if my colleagues are comf- comfortable
[58:04]
with this, permitting the PTA donation
[58:07]
to count against as as matching funds,
[58:10]
which therefore would allow us to raise
[58:12]
our contribution to the full 20,000,
[58:15]
actually is really important in terms of
[58:17]
you being able to get the budget.
[58:19]
>> No, it it it is, but we
[58:22]
also
[58:24]
have a plan where with what we have now
[58:26]
and what we contribute, we can get the
[58:30]
maintenance done and then if we needed
[58:33]
to
[58:34]
piece out, you know, buying the
[58:36]
educational board, we could do that um
[58:39]
in the year as we're fundraising,
[58:43]
uh
[58:44]
whether it's like I said through the
[58:45]
annual fund or
[58:47]
whatever it is that we get. Um my family
[58:50]
typically does a $10,000 match. So maybe
[58:54]
instead of that, we would
[58:55]
give to this. So it's it's um it is
[58:58]
fluid, but I mean, we're close.
[59:05]
» Um I was also a little confused. I'm
[59:07]
going to play back what I think I
[59:08]
understand from this and tell me if I've
[59:10]
got it right.
[59:11]
So your original estimate was 65,000.
[59:14]
>> Yep.
[59:14]
>> You've trimmed that down to 49,400.
[59:19]
Plus 3,000 for the umbrellas or does
[59:21]
that include 3,000 for the umbrellas?
[59:23]
>> So
[59:24]
>> It's just a yes or no. We I know
[59:26]
>> I'm just waiting cuz I have to use um
[59:29]
district-approved
[59:31]
contractors. So, you know, they ballpark
[59:35]
things for me, but then I need to go to
[59:37]
it.
[59:37]
>> Is the total project now 49,400 or is it
[59:41]
52,400?
[59:42]
>> It's 52,400.
[59:43]
>> Okay, so 52,400.
[59:45]
>> That's what I would say is what I'm
[59:46]
looking at.
[59:47]
>> you hope to get.
[59:48]
>> Yep.
[59:48]
>> You already have
[59:51]
33 in
[59:52]
hand including our 10,000.
[59:55]
If the PTA
[59:57]
comes up with 10, we come up with 10,
[1:00:00]
you've got all the money you need.
[1:00:02]
>> Yeah.
[1:00:02]
>> Very close.
[1:00:03]
>> Yeah.
[1:00:04]
>> [laughter]
[1:00:04]
>> Right.
[1:00:04]
>> Yeah. Thank you.
[1:00:05]
>> Yeah.
[1:00:07]
>> And most immediately
[1:00:09]
you need this 39 to cover the work
[1:00:12]
that's already begun, right?
[1:00:13]
>> And I have 23 of it. Like I've got the 10
[1:00:18]
from
[1:00:19]
um
[1:00:21]
from section five and like as of tonight
[1:00:23]
I'll have the 13 from from section
[1:00:26]
three. So, I we're good to start. I
[1:00:28]
mean, we wouldn't have started if we
[1:00:29]
didn't think
[1:00:31]
we knew you know, didn't think we had
[1:00:33]
the funds
[1:00:34]
to cover that.
[1:00:35]
>> Is there a Is there a special account
[1:00:37]
that's been set up
[1:00:38]
for this project, a dedicated account?
[1:00:41]
>> It's not a dedicated account. It's a
[1:00:42]
line item
[1:00:44]
uh but
[1:00:45]
>> Line item in what in whose budget?
[1:00:46]
>> In our budget. Yeah, I mean but
[1:00:48]
>> It meaning the PTA's budget?
[1:00:50]
>> PTA budget. Yeah, yeah, yeah. I mean,
[1:00:51]
there's a line for it, but it's not if
[1:00:54]
you mean like did we set up a separate
[1:00:56]
bank account? No, but
[1:00:58]
>> Okay. I just want to make sure I
[1:00:59]
understood.
[1:01:00]
>> Yeah, yeah.
[1:01:01]
>> Just in terms of tracking our donation.
[1:01:03]
>> Yeah, no, I
[1:01:05]
So, everything that came in with that
[1:01:07]
gets tracked to
[1:01:09]
a specific number in QuickBooks. So, all
[1:01:13]
of that is tracked. So, when I sent that
[1:01:15]
from Todd, you know, that was everything
[1:01:19]
that came from from
[1:01:22]
that request, the 2788, and that's
[1:01:26]
marked when we run the report on that, that's
[1:01:31]
everything marked to that specific link.
[1:01:33]
It's
[1:01:35]
the 7,000 is from our general fund
[1:01:38]
though. Like if we were to do the
[1:01:40]
remaining match, that's just PTA general
[1:01:43]
fund.
[1:01:44]
>> Right. Okay.
[1:01:44]
>> Does that make sense?
[1:01:47]
» Okay, so I have um so thank you, Katie.
[1:01:50]
Um I have some questions for for you all
[1:01:52]
and and for Todd in terms of how we
[1:01:54]
would do this. So, in the past when
[1:01:57]
we've given other grants and and we have
[1:01:59]
done other grants to nonprofit
[1:02:01]
organizations that serve town residents,
[1:02:04]
um
[1:02:05]
we
[1:02:06]
write the check to the organization. So,
[1:02:09]
let's just start with the 10 grand that
[1:02:11]
we
[1:02:12]
committed. Um and then how have we ever
[1:02:16]
done matching funds? And if so, how
[1:02:19]
would we verify that those matching
[1:02:21]
funds were actually collected for this
[1:02:23]
purpose?
[1:02:27]
» Oh gosh.
[1:02:27]
>> Well, I Oh, sorry.
[1:02:29]
>> Yeah.
[1:02:29]
>> Todd. Go ahead.
[1:02:31]
Todd.
[1:02:32]
>> Off the top of my head, I don't know if
[1:02:33]
we've done any done anything like this
[1:02:35]
in in a matching way, but I don't have
[1:02:38]
total recall right now over the past
[1:02:41]
20-some years to know if we've ever done
[1:02:43]
this, but not that I can recollect.
[1:02:47]
» Yeah, I haven't either.
[1:02:48]
>> [clears throat]
[1:02:49]
>> This was an
[1:02:50]
off-the-cuff idea and how to try to
[1:02:52]
>> I have I mean, I have from because it
[1:02:55]
was um primarily people giving through
[1:02:59]
um online donation. Like I the list that
[1:03:03]
I produce comes from Stripe, and I can
[1:03:05]
produce more evidence of it being a real
[1:03:10]
transaction if you need, but that that
[1:03:13]
comes from people clicking on a specific
[1:03:15]
link that only goes to the outdoor
[1:03:18]
classroom funding. So, I was really
[1:03:22]
intentional about tracking it
[1:03:24]
>> Correct.
[1:03:24]
>> that way.
[1:03:25]
Um
[1:03:26]
so,
[1:03:27]
I feel really and I'd be happy to open
[1:03:29]
up the books to Todd, to anyone to to
[1:03:32]
see the back end of Stripe of, you know,
[1:03:35]
the verified transactions
[1:03:37]
that have happened, you know, um
[1:03:40]
if that would make you feel comfortable.
[1:03:42]
>> Yes.
[1:03:43]
>> And then um for us, I mean,
[1:03:46]
we would probably if you allow the PTA
[1:03:50]
to do it, we would probably give a check
[1:03:53]
or I don't know what we would have to
[1:03:55]
show, a check or something set aside.
[1:03:57]
Maybe I would
[1:03:58]
pay to that link
[1:04:01]
from our bank account, you know, to show
[1:04:04]
the money from the PTA went or
[1:04:06]
something. I'm trying to think of how we
[1:04:08]
would maybe pay ourselves on that link
[1:04:11]
so that you could see
[1:04:13]
that. And so, we have the address and
[1:04:15]
name and contact information of
[1:04:18]
everybody. Yeah, yeah. And then they would be us.
[1:04:21]
>> Okay, so I think we can work out with
[1:04:23]
the town manager an appropriate way
[1:04:25]
>> I can definitely get with you the
[1:04:27]
nitty-gritty of it. Um
[1:04:29]
but that those are that's how we went
[1:04:32]
about it and part of the reason we did
[1:04:34]
that specific link through Stripe, which
[1:04:37]
is our payment processor, was
[1:04:39]
to keep all of that separate from,
[1:04:42]
you know, spirit wear, whatever, you
[1:04:44]
know, all the other little things that
[1:04:45]
we do. So, that was only for that.
[1:04:48]
>> Okay. Okay.
[1:04:50]
>> And we may we could also ask for a
[1:04:51]
post-project report how the funds were
[1:04:53]
used uh to ensure that our auditor has
[1:04:57]
everything that they need to
[1:04:59]
>> [clears throat]
[1:04:59]
>> ensure that
[1:05:00]
>> Okay.
[1:05:00]
>> So, absolutely they're kidding me if
[1:05:02]
they can't be provided a report on
[1:05:05]
>> you need.
[1:05:07]
All right. Very good.
[1:05:11]
And that I've been the treasurer, so
[1:05:12]
I've been the one also like I'm
[1:05:15]
going into a different role, but I've
[1:05:17]
been the one handling all the
[1:05:19]
transactions, so I feel really
[1:05:21]
comfortable like that everything is in
[1:05:23]
good order.
[1:05:25]
>> I was going to suggest that
[1:05:27]
in addition to whatever detail Todd
[1:05:29]
thinks is necessary,
[1:05:32]
just a letter that is a certification,
[1:05:35]
you know, we have an approval that we
[1:05:36]
took a few months ago.
[1:05:39]
And you know, something from the PTA
[1:05:41]
that certifies that they've raised money
[1:05:44]
in accordance with
[1:05:46]
how we approved it, so we can match. So,
[1:05:49]
just have that as a
[1:05:50]
single document and then
[1:05:52]
I'd leave it to Todd as to how much
[1:05:54]
verification beyond that he feels is
[1:05:56]
necessary.
[1:05:57]
>> No, that makes sense. We can do
[1:05:59]
something that um is similar to the
[1:06:01]
acknowledgement from the district and
[1:06:03]
sort of
[1:06:05]
puts all of that in a piece and you can
[1:06:07]
have exhibits that show both, you know,
[1:06:10]
the district approval, the approved
[1:06:12]
contract, and the maintenance
[1:06:14]
contract that we have with the you know,
[1:06:17]
with the district.
[1:06:19]
But we're very excited cuz it's going to
[1:06:21]
make the space more usable. So, we're we really do appreciate it.
[1:06:27]
» Very good.
[1:06:28]
So, Todd, what is the next step for us?
[1:06:31]
Do we need to make a motion to approve
[1:06:34]
the grant? Um
[1:06:35]
from what I understand though, the the
[1:06:37]
$10,000 grant was that already approved
[1:06:39]
last year?
[1:06:39]
>> Yes.
[1:06:40]
>> Okay. So, that grant was approved.
[1:06:42]
>> There were conditions to it though.
[1:06:44]
>> Yeah.
[1:06:44]
>> Which have to be met including the
[1:06:46]
contract and some other items. Todd, you
[1:06:48]
may recall the specifics of it.
[1:06:49]
But yes, there were some conditions. It
[1:06:51]
was It was an outright grant of 10,000.
[1:06:53]
>> Right. Okay. And so then the contract
[1:06:55]
has at least for the for the phase one
[1:06:57]
work of the outdoor classroom has been
[1:06:59]
presented with Katie's materials. And so
[1:07:02]
then the only thing that needs to be
[1:07:03]
done is as Carlos suggested a
[1:07:05]
certification that other funds have been
[1:07:07]
raised.
[1:07:08]
>> do we I think the the question is what
[1:07:10]
is the size of the matching grant?
[1:07:12]
>> Right.
[1:07:12]
>> Uh and are we comfortable that the PTA
[1:07:15]
contribution could count against the
[1:07:17]
match? If we are,
[1:07:19]
then if I understand Katie's point, we
[1:07:22]
would then be providing an additional
[1:07:23]
$10,000
[1:07:26]
rather than only the additional 20 788.
[1:07:30]
Um and
[1:07:31]
>> And if you're if you decide that you're
[1:07:33]
not
[1:07:35]
>> We would need a motion for that.
[1:07:37]
>> Yeah.
[1:07:38]
>> Um but we have a plan still even if you
[1:07:42]
were to not approve that. We will still
[1:07:44]
put up money from the PTA and we just
[1:07:47]
didn't have, you know,
[1:07:50]
50,000 to do on our own, but we always
[1:07:52]
plan to commit money and um if you don't
[1:07:57]
think that that's an appropriate way cuz
[1:07:59]
I really wasn't sure. I asked Todd. I
[1:08:01]
was like, I don't even know if that is
[1:08:04]
allowed to say, you know, the PTA would
[1:08:06]
get the match from their funds, but I'm
[1:08:09]
prepared to go back to section three and
[1:08:11]
they will assist me. I I'm confident of
[1:08:14]
that.
[1:08:15]
>> Okay, so then
[1:08:16]
>> By the way, I think
[1:08:18]
>> Todd, go ahead.
[1:08:19]
>> Yeah. Uh a PTA is a non-governmental
[1:08:21]
source. It's it's a 501c3. So I I that
[1:08:25]
would be eligible for a match from the
[1:08:26]
town.
[1:08:27]
Yeah, in in
[1:08:30]
um
[1:08:31]
June of 2025, uh there was a resolution
[1:08:34]
that was submitted to a public hearing
[1:08:36]
for this support. Um obviously the
[1:08:39]
contribution was subject to conditions
[1:08:41]
being met.
[1:08:42]
Uh they have been met according to your
[1:08:45]
discussion this evening. Um and there
[1:08:48]
was a commitment to provide that support
[1:08:50]
on those conditions. So tonight would
[1:08:52]
just be a motion for a supplemental
[1:08:55]
appropriation for the entire amount of
[1:08:57]
what you decide to contribute.
[1:09:00]
>> I see. So we're voting on or we're
[1:09:03]
proposing a resolution to approve the
[1:09:05]
match.
[1:09:06]
>> Yes.
[1:09:07]
>> Because the council's already approved
[1:09:09]
the grant that was $10,000.
[1:09:10]
>> not not exactly. They didn't approve it
[1:09:13]
was a resolution to support it with
[1:09:15]
certain funding levels if conditions
[1:09:17]
were met. So, it was a conditional
[1:09:19]
support or commit conditional
[1:09:21]
commitment. Tonight you would do a
[1:09:23]
supplemental for the entire amount of
[1:09:25]
the contribution.
[1:09:27]
>> I see. Okay. So, we're comfortable that
[1:09:31]
following the resolution that was made
[1:09:33]
last year for the $10,000 commitment
[1:09:35]
that we would approve that
[1:09:37]
payment to the Rosemary Hills PTA.
[1:09:41]
>> I mean, I suggest the wording as follows
[1:09:43]
that we
[1:09:45]
make an appropriation tonight of
[1:09:48]
uh
[1:09:51]
20,000 Well, let me let me say it in two
[1:09:54]
pieces. Appropriation of 10,000
[1:09:57]
plus another 10,000 upon evidence
[1:10:01]
acceptable to our town manager of a
[1:10:04]
matching amount of 10,000.
[1:10:06]
And that we accept that the PTA
[1:10:08]
contribution will count as part of that
[1:10:10]
match.
[1:10:12]
With what we know tonight, that
[1:10:13]
effectively means that we'll be
[1:10:14]
appropriating $20,000.
[1:10:17]
>> Thank you.
[1:10:19]
Well said. [clears throat]
[1:10:20]
>> Okay.
[1:10:21]
>> I'll second.
[1:10:24]
» All in favor.
[1:10:25]
>> I.
[1:10:27]
>> Thank you again. Maybe if you have time
[1:10:29]
when we're finished, we'd love to have
[1:10:31]
you come see the space. We would really
[1:10:33]
appreciate that.
[1:10:33]
>> before the beginning of the school year?
[1:10:35]
>> It should be the the um maintenance part
[1:10:39]
is definitely the ordering of some of
[1:10:41]
the um
[1:10:43]
of the educational materials is sort of
[1:10:46]
like dependent, but they'll still be
[1:10:48]
able to use it and enjoy it um right
[1:10:52]
away in in the fall, which is really
[1:10:55]
nice.
[1:10:55]
>> Right.
[1:10:56]
>> Thank you so much.
[1:10:57]
>> Okay.
[1:10:59]
>> Thank you.
[1:11:01]
Do we have any other items for
[1:11:02]
discussion this evening?
[1:11:04]
>> Uh I think the only other one if I can
[1:11:06]
offer one which Rich and join an absent
[1:11:08]
conversation about because of dealing
[1:11:10]
with traffic but obviously we've all
[1:11:12]
seen the not large number of notes in
[1:11:13]
the list serve
[1:11:15]
regarding the parking policy. And um
[1:11:19]
the uh
[1:11:22]
I I've I think that the
[1:11:25]
what's happened in the past in this and
[1:11:27]
I've I'm not just speaking about Rich
[1:11:28]
has been the most recent liaison to the
[1:11:30]
public services committee but I was the
[1:11:32]
liaison when we last really took up this
[1:11:34]
issue with a deep dive a couple of years
[1:11:35]
ago.
[1:11:36]
And the PSC does really great work but
[1:11:40]
inevitably only the people who are
[1:11:42]
directly involved in the issue in hand
[1:11:44]
end up knowing much about it. So I think
[1:11:47]
one of the things that's really starkly
[1:11:49]
evident from reading these list serve
[1:11:51]
posts is how little people know about
[1:11:54]
the policy. Uh I you you would come to
[1:11:57]
think that somehow we we we grant
[1:12:00]
certain streets a privilege of having
[1:12:02]
permitted parking
[1:12:03]
uh for the purpose of being able to park
[1:12:06]
as close as possible. That's the
[1:12:08]
which obviously is not the way the
[1:12:10]
policy works
[1:12:12]
uh and nor obviously the intent.
[1:12:15]
Uh so uh my thought was that we ought to
[1:12:18]
put out some kind of
[1:12:20]
notice um
[1:12:22]
to really in allow people to understand
[1:12:26]
not only what our policy is but why it
[1:12:28]
we have policy we have and get into some
[1:12:31]
of the issues that in fact have been
[1:12:33]
grappled with in the past. Um and and um
[1:12:38]
and
[1:12:38]
one way I was thinking of doing this was
[1:12:40]
through a Q&A
[1:12:41]
that we could eventually put out as a
[1:12:43]
town crier which we know it then be
[1:12:45]
picked up on the list serve as at least
[1:12:47]
a first effort to on on mass address
[1:12:51]
the questions. Uh and to give one
[1:12:53]
example that we drilled down on before,
[1:12:56]
but is pertinent, uh
[1:12:58]
clearly there are residents who feel
[1:13:00]
that some number of of residents who
[1:13:02]
have parking permits abuse the privilege
[1:13:05]
and not only park on the street they
[1:13:07]
live, but when they want to go to Trader
[1:13:09]
Joe's or somewhere over near Bethesda,
[1:13:11]
they park over on the eastern edge of
[1:13:13]
the town. Uh and the western edge of the
[1:13:15]
town. Um and I sure there is some of
[1:13:18]
that. I don't know how much, but
[1:13:20]
let's grant that it happens. Um the PSC
[1:13:24]
considered that issue very carefully
[1:13:26]
with the view that the only way you
[1:13:28]
could really solve it would be actually
[1:13:30]
to go to kind of zonal parking. And and
[1:13:32]
the streets closest to the west edge of
[1:13:34]
the town would have their own zone.
[1:13:37]
Um but, you know, on reflection, the
[1:13:39]
committee felt and the council that I
[1:13:41]
was on at the time agreed
[1:13:44]
that that's becomes problematic. First
[1:13:46]
of all, it just means people who want to
[1:13:47]
get close to Bethesda park on the edge
[1:13:50]
of whatever zone they're allowed to be
[1:13:51]
in. So, the situation moves back from
[1:13:54]
46th Street to 45th Street or whatever,
[1:13:56]
you know, wherever you put it. And then
[1:13:58]
you also get caught up with families
[1:14:01]
that live right at the border
[1:14:03]
and who may be seeking to park and now
[1:14:05]
find that they're parking in the wrong
[1:14:07]
zone and are you know, liable for for a
[1:14:10]
citation
[1:14:12]
because they strayed across the line and
[1:14:14]
they're parking in the wrong zone. So,
[1:14:16]
at the end, the the committee and
[1:14:19]
ultimately the council said, look,
[1:14:21]
for all those reasons, leave things the
[1:14:23]
way they are, but let's again try some
[1:14:25]
moral suasion.
[1:14:27]
And we did have some more
[1:14:30]
you know, town criers and other messages
[1:14:32]
saying, please, essentially, don't abuse
[1:14:34]
this. This is still allow you to park
[1:14:36]
near your homes conveniently
[1:14:39]
and [clears throat] to hold back the
[1:14:40]
number of other people who'd be parking
[1:14:42]
near your home so you can. Uh but don't
[1:14:45]
take this as a license to park, you
[1:14:47]
know, on 46th Street. So, anyway, that was what we did and obviously all
[1:14:52]
that has been either wasn't fully
[1:14:54]
understood, appreciated, or communicated
[1:14:56]
well. Could be our fault, but I think
[1:14:59]
given the spate of these listserv
[1:15:01]
notices, it's worthwhile our making an
[1:15:03]
effort to, as I you've often heard me
[1:15:05]
say, rerun the commercial and at least
[1:15:07]
lay it out and and then obviously there
[1:15:10]
could still be more commentary and we
[1:15:12]
may have to grapple with it again, but
[1:15:13]
at least people should go into the
[1:15:15]
discussion with more information than
[1:15:17]
thinking that that we set up a permit
[1:15:19]
system and arbitrarily
[1:15:21]
we and the council make decisions about
[1:15:23]
this and that somehow it's a privilege
[1:15:25]
to have a permit.
[1:15:27]
>> Thanks for the background on that,
[1:15:28]
Bernie. It is really
[1:15:31]
it's a fraught issue. I remember last
[1:15:33]
time I was on the council we talked
[1:15:35]
about parking many times, but it it does
[1:15:38]
bear repeating. So, thanks
[1:15:41]
and thanks for your input on working on
[1:15:43]
that FAQ document.
[1:15:45]
>> And I'll I'll I'll engage Rich as well.
[1:15:48]
>> [laughter]
[1:15:49]
>> Claude does pretty good work, Joy. Thank
[1:15:52]
you.
[1:15:52]
>> [laughter]
[1:15:53]
>> I'm sorry.
[1:15:55]
Oh, Claude does pretty good work, yeah.
[1:15:56]
Whoever Claude is.
[1:15:58]
>> Whoever Claude is, indeed.
[1:16:01]
All right, if we don't have any other
[1:16:02]
issues, we will adjourn this meeting.
[1:16:05]
>> Okay.