Agenda
Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
These are YouTube's auto-generated captions, not a human transcript — expect occasional errors, especially with names and technical terms.
[2:09]
I don't think anybody was expecting
[1:05:45]
Welcome to our meeting this afternoon. I
[1:05:48]
would officially like to call this
[1:05:49]
meetingwork session to order today,
[1:05:53]
Thursday, August 20th
[1:05:56]
uh 2026 at 300 p.m. Uh the meeting is
[1:06:00]
officially called to order and we will
[1:06:02]
have our invocation delivered by Mr.
[1:06:04]
Hatum followed with a pledge by Mr.
[1:06:06]
Jamson. So if you please stand.
[1:06:10]
>> Good to see everyone here today. Let's
[1:06:12]
pray. Our dear heavenly father, we come
[1:06:14]
to you at this time, Lord, thanking you
[1:06:16]
for the privilege and honor of serving
[1:06:19]
uh the citizens of Franklin County.
[1:06:21]
Lord, we pray that everything that we do
[1:06:22]
and say in this meeting will be
[1:06:24]
according to your precious will and
[1:06:27]
pleasing in your sight. Lord, we pray
[1:06:28]
that everything that we do that we
[1:06:30]
always look to you for wisdom and
[1:06:32]
guidance in everything that we say and
[1:06:33]
do. In Jesus name I pray and ask it all.
[1:06:36]
Amen.
[1:06:36]
>> Amen.
[1:06:39]
>> Pledge allegiance to the flag of the
[1:06:41]
United States of America and to the
[1:06:43]
republic for which it stands, one nation
[1:06:47]
under God, indivisible, with liberty and
[1:06:50]
justice for all.
[1:06:54]
» Okay. Thank you all very very much. Um
[1:06:57]
you will note at your place um that
[1:07:00]
we've got uh an amended agenda from the
[1:07:03]
one initially sent out um with the um
[1:07:07]
the noted change of an item for the
[1:07:10]
Boone district vacancy at the end um of
[1:07:13]
our workday here. Um but given that are
[1:07:16]
there any uh concerns uh any additions
[1:07:19]
you'd like to recommend for the agenda?
[1:07:24]
Okay. Hearing none. Um I will accept a
[1:07:27]
motion to approve the agenda as
[1:07:29]
submitted.
[1:07:31]
>> So move.
[1:07:32]
>> Second.
[1:07:32]
>> Thank you. All those in favor, please
[1:07:34]
say I.
[1:07:35]
>> I.
[1:07:36]
Opposed like sign. And that carries.
[1:07:38]
Okay. Mr. Sandy, we're going to begin
[1:07:40]
our work sessions and I will turn it
[1:07:42]
over to you to introduce your staff and
[1:07:46]
get us get us moving here.
[1:07:47]
>> All right. Thank you. Um yeah, we we did
[1:07:50]
want to take this opportunity to provide
[1:07:52]
a a little update on the progress and
[1:07:54]
activities. We're calling it W Weaver
[1:07:56]
Street. So, this is not only the CTE,
[1:07:59]
but you know, this is referring to the
[1:08:01]
ModCraft, former ModCraft building, uh
[1:08:03]
which is located on Weaver Street, which
[1:08:05]
we intend to have more of a multi-use
[1:08:08]
structure. So, it's not strictly the
[1:08:09]
CTE. So, so Brandy's kind of going to
[1:08:11]
give a more holistic update. And then I
[1:08:14]
know uh Supervisor Quinn had requested
[1:08:15]
an opportunity to speak more
[1:08:17]
specifically to the CTE portion uh of
[1:08:20]
the project. And so following Bry's
[1:08:22]
presentation, uh we have another
[1:08:24]
presentation that um Mr. Quinn, I don't
[1:08:26]
know if you're going to do it from your
[1:08:27]
seat or if you're going to go up there.
[1:08:29]
Okay.
[1:08:30]
um we'll make a presentation and then
[1:08:32]
the expectation would maybe be any
[1:08:34]
discussion or questions um you know at
[1:08:36]
that point that that we can work work on
[1:08:39]
to address for you either today or come
[1:08:41]
back with further information and then
[1:08:44]
um you know once we complete that
[1:08:46]
segment then we plan to to move forward
[1:08:48]
with you with some planning updates and
[1:08:50]
some discussion on a couple plans.
[1:08:52]
>> Very good.
[1:08:53]
>> Thank you.
[1:08:53]
>> We'll let Brandy
[1:08:54]
>> Good afternoon Brandy. Uh good
[1:08:56]
afternoon. Uh it's my pleasure to be
[1:08:58]
here this afternoon to give you guys a
[1:08:59]
brief update on the Weaver Street
[1:09:01]
property um progress and just very
[1:09:04]
quickly to touch on the progress that
[1:09:06]
we've had since our last update. Um our
[1:09:09]
site cleanup still continues with the
[1:09:10]
assistance of the sheriff's office. Uh
[1:09:12]
we've removed just over 300 tons of
[1:09:15]
material at this point um utilizing um
[1:09:18]
labor from their trustees. So we really
[1:09:20]
appreciate the partnership with them. Uh
[1:09:22]
we have continued communication with our
[1:09:24]
industry experts. Um these are the group
[1:09:26]
that we interviewed previously when we
[1:09:28]
were determining the project delivery
[1:09:29]
strategy. Uh they consist of general
[1:09:32]
contractors, architects um and owner's
[1:09:35]
representatives.
[1:09:36]
Um we have drafted a request for
[1:09:38]
proposals or an RFP uh for owner's
[1:09:41]
representative services which I will
[1:09:43]
touch on that um in some future slides.
[1:09:46]
We have collected sample RFPs for
[1:09:48]
architecture um or architect engineering
[1:09:51]
services or A&E services as I'll refer
[1:09:53]
to it for the rest of the presentation.
[1:09:55]
Uh we've toured additional E911
[1:09:58]
facilities um most recently um the
[1:10:01]
renovated facility in Pennsylvania
[1:10:02]
County last week and we are finalizing
[1:10:06]
the disposition of the back parcel. Um
[1:10:08]
you guys approved the sale of that
[1:10:09]
parcel um and we're going through a
[1:10:12]
little bit of due diligence on that now.
[1:10:13]
Um we don't have a closing date. um at
[1:10:16]
this time.
[1:10:19]
So just a reminder, the project delivery
[1:10:21]
strategy that was approved by the board
[1:10:23]
was their traditional design bid build.
[1:10:25]
Um I won't read through the exact
[1:10:27]
description of it, but um it it is
[1:10:29]
basically uh the process that you see
[1:10:32]
most commonly used where you design the
[1:10:34]
facility under um an architect engineer,
[1:10:38]
then you put it out to bid and then you
[1:10:39]
have a general contractor construct it.
[1:10:43]
looking at the order of priorities on
[1:10:44]
this form of um delivery strategy. Uh
[1:10:48]
you typically see cost, time, and then
[1:10:50]
quality. Um having quality listed as the
[1:10:52]
third priority is not necessarily a bad
[1:10:54]
thing. It's just the cost and the timing
[1:10:57]
of the building um tend to be the higher
[1:11:00]
priority in this type of delivery
[1:11:01]
strategy. Uh looking at the process
[1:11:04]
under design bid build, we will issue
[1:11:06]
that RFP for owner's representative
[1:11:08]
services. Uh following that we'll have a
[1:11:11]
request for proposals issued for A&E
[1:11:13]
services. So our architect engineer
[1:11:16]
um an architect will be selected and a
[1:11:19]
comprehensive proposal developed which
[1:11:20]
will include uh pricing for your
[1:11:23]
schematic design development
[1:11:25]
construction documents um construction
[1:11:28]
administration and so on. Uh we will
[1:11:31]
engage the third party cost estimator at
[1:11:33]
that point to give us a very detailed
[1:11:34]
estimate of what we feel the project is
[1:11:36]
going to cost.
[1:11:38]
uh we'll pre-qualify general contractors
[1:11:41]
that may be interested in the project
[1:11:43]
and then issue that invitation for bids
[1:11:45]
for general contractor services.
[1:11:48]
Uh the contract will be awarded to the
[1:11:50]
low bidder and be approved by this
[1:11:52]
board. Um and construction will begin
[1:11:54]
after that. Um I did want to note um
[1:11:57]
that running concurrently with all these
[1:11:59]
steps is engagement with our project
[1:12:01]
partners. So there'll be constant
[1:12:03]
dialogue um with our school system, our
[1:12:05]
community colleges, farm college,
[1:12:07]
businesses, um economic development,
[1:12:10]
everybody that's going to be key players
[1:12:11]
in this uh process.
[1:12:15]
So kind of touching on what an owner's
[1:12:17]
representative is. Um and this is pulled
[1:12:19]
out of the RFP. Um an owner's
[1:12:23]
representative is a consultant that
[1:12:24]
provides pre-construction and um
[1:12:26]
construction phase um construction
[1:12:29]
related project management. Um it can
[1:12:31]
also include building commission
[1:12:33]
services and um a variety of other
[1:12:35]
services if needed. The consultant acts
[1:12:38]
as the owner's project manager and
[1:12:40]
provides sufficient administrative
[1:12:42]
management and related services um as
[1:12:45]
required to fulfill the contract.
[1:12:48]
So looking at the preconstruction
[1:12:50]
services and I won't read these
[1:12:51]
verbatim. Uh they do assist the owner
[1:12:54]
with generating the RFP for architecture
[1:12:56]
and engineer services. They review
[1:12:58]
available programs, plans,
[1:13:00]
specifications, cost estimates and so
[1:13:02]
on. Um and lead um the kickoff like the
[1:13:05]
phase in meeting uh between the county
[1:13:08]
and our architect.
[1:13:10]
Uh they provide document reviews at
[1:13:12]
various phasages phases of design. Uh
[1:13:15]
looking at programming,
[1:13:16]
constructibility,
[1:13:17]
scheduling, construction duration,
[1:13:19]
construction cost. Um
[1:13:23]
they manage the owner's project and
[1:13:25]
construction budget. um compare design
[1:13:28]
phase estimates with um budget cost and
[1:13:31]
prepare uh an update cash flow analysis.
[1:13:35]
They monitor and maintain overall
[1:13:37]
project master schedule um including
[1:13:40]
major design and pre-construction
[1:13:41]
activity, start and finish dates, review
[1:13:44]
times, and key milestones.
[1:13:47]
um they identify potential owner direct
[1:13:49]
procurement strategies um and really
[1:13:52]
weigh the the benefits and risk of
[1:13:54]
those.
[1:13:56]
Excuse [clears throat] me. Um finally,
[1:13:58]
they provide contract administration
[1:14:00]
support. So they're doing invoice
[1:14:01]
review, pay application review, um
[1:14:04]
conflict resolution if needed, um they
[1:14:07]
do special inspections, direct
[1:14:09]
procurement if we decide to do that, um
[1:14:11]
and so on.
[1:14:14]
And very quickly, um, they also help,
[1:14:16]
uh, prepare the potential biders list
[1:14:18]
for construction. Um, so they they'll
[1:14:21]
start what's considered a bidder's
[1:14:23]
interest campaign where they're reaching
[1:14:24]
out, um, to contractors that may be
[1:14:27]
interested in bidding the project, and
[1:14:28]
that'll be coordinated with our
[1:14:30]
architect. On behalf of the owner,
[1:14:32]
they'll review bid documents prepared by
[1:14:34]
the architect, assist the owner in
[1:14:36]
preparing and placing advertisements um
[1:14:38]
to solicit bids um for owner purchased
[1:14:43]
items and also um consultant contracts
[1:14:45]
if needed. Uh they represent the owner
[1:14:48]
and construction pre-bid conferences
[1:14:50]
that'll be led by our architect. uh
[1:14:52]
reviewing agenda that are generated
[1:14:54]
during that process uh for
[1:14:56]
constructibility effect on the project
[1:14:59]
um construction budgets and timelines.
[1:15:01]
Um and finally, they'll assist um the
[1:15:04]
county with bid evaluations and
[1:15:06]
selection.
[1:15:08]
[snorts]
[1:15:09]
Moving to construction services, they
[1:15:11]
provide and maintain on-site management
[1:15:12]
for the project as an agent of the
[1:15:14]
county. They provide and maintain
[1:15:17]
on-site records.
[1:15:19]
They verify that all required permits,
[1:15:21]
bonds, and insurance have been obtained
[1:15:22]
by all parties. They monitor
[1:15:25]
construction contract administration by
[1:15:27]
the architect. Uh they represent the
[1:15:30]
owner at progress meetings with the
[1:15:31]
architect, the contractor, and any other
[1:15:33]
parties needed.
[1:15:35]
Uh they establish a program to monitor
[1:15:37]
construction quality. Uh really to guard
[1:15:39]
the owner against any work that does not
[1:15:41]
conform.
[1:15:43]
Um
[1:15:46]
excuse me, just one second. to the
[1:15:47]
construction contract requirements. Um,
[1:15:50]
in conjunction with the architect and
[1:15:52]
the contractor, they orchestrate a plan
[1:15:53]
for successful building occupancy and
[1:15:55]
acceptance. Uh, they review and certify
[1:15:58]
that contractor's construction schedule
[1:16:00]
and schedule of values is prepared in
[1:16:02]
accordance with uh contract documents
[1:16:04]
and industry practices.
[1:16:07]
Um, they provide regular updates to the
[1:16:09]
board of supervisors and the school
[1:16:10]
board on the construction progress.
[1:16:13]
uh provide monthly updates including but
[1:16:15]
not limited to a brief description of
[1:16:17]
monthly construction activities and
[1:16:19]
financial information. And at the
[1:16:21]
conclusion of the project, they prepare
[1:16:23]
to deliver uh prepare and deliver to the
[1:16:26]
owner a final accounting of the project
[1:16:28]
budget um and all closeout reports.
[1:16:32]
Um so that is my update for you and um I
[1:16:35]
can either answer questions now or if
[1:16:37]
Mr. Quinn would like to do his
[1:16:38]
presentation, we can answer questions
[1:16:40]
after that.
[1:16:41]
>> Thank you. Does anybody have any
[1:16:42]
questions for Brandy before Mr. Quinn
[1:16:44]
presents? Please.
[1:16:46]
>> I have a couple Brandy. So,
[1:16:48]
>> do you envision this owner's
[1:16:50]
representative being a person or a
[1:16:52]
company? And I just asked that because
[1:16:54]
it's a pretty diverse set of
[1:16:56]
capabilities. I'm wondering if one
[1:16:57]
person can have that or are you looking
[1:16:59]
for a a company where when you put all
[1:17:01]
the people in that company together,
[1:17:02]
they can provide that service.
[1:17:04]
>> I've done both. Um, I've done a regional
[1:17:06]
jail project where we used um a single
[1:17:08]
owner's representative that was very
[1:17:10]
specialized in correctional facility
[1:17:12]
design. Um, and I've also used um larger
[1:17:15]
groups where um if we are looking at
[1:17:17]
public safety section of the building,
[1:17:19]
it may be one representative from their
[1:17:21]
company for that part of it. But if it's
[1:17:22]
CTE, it would be somebody that
[1:17:24]
specializes in that area. Mhm.
[1:17:26]
>> And then I don't see the word quality in
[1:17:30]
here anywhere except in the beginning
[1:17:31]
where you know it's the third priority.
[1:17:34]
And just wondering how we can ensure
[1:17:36]
that quality is is an equal equally
[1:17:38]
important part of this where it's almost
[1:17:40]
these three objectives together and and
[1:17:42]
maybe quality is third but but it's a a
[1:17:44]
very close third to to the first two.
[1:17:47]
Oh,
[1:17:47]
>> I would absolutely agree that it ranks
[1:17:49]
right up there with it. Um, I would say
[1:17:52]
the selection of the the the best
[1:17:55]
owner's representative, architect, and
[1:17:57]
contractor. They're all going to have to
[1:17:58]
work together to ensure that quality.
[1:18:00]
But having the owner's representative as
[1:18:02]
our boots on the ground every day um
[1:18:04]
truly there to represent us. They're not
[1:18:06]
there to represent the architect.
[1:18:07]
They're not there to represent the
[1:18:08]
contractor. Um they're there truly to
[1:18:11]
represent us um and the construction of
[1:18:13]
that facility. So I think quality would
[1:18:14]
be insured through that position. And
[1:18:17]
then the the last question, I just
[1:18:18]
wondered if you envisioned the contract
[1:18:21]
with the owner's representative having
[1:18:23]
performance incentives, for example,
[1:18:24]
minimizing ECPs in the construction
[1:18:26]
process and if if they were able cost
[1:18:29]
containment, something around cost, so
[1:18:31]
they're they're financially incented to work with us to minimize ECPs.
[1:18:36]
>> I had not considered that, but it's
[1:18:37]
certainly something that we could work
[1:18:38]
into the RFP. Um, if that's the desire
[1:18:41]
of the board,
[1:18:43]
>> I think it'd be interesting to have a
[1:18:44]
variable component with them where they
[1:18:46]
were they truly had a financial
[1:18:48]
incentive to help us, right? It would
[1:18:50]
just align them with us better if they
[1:18:53]
knew that to the extent that they keep
[1:18:55]
the the cost where it should be and they
[1:18:57]
don't have overruns and they don't have
[1:18:59]
um ECPs that that were that they're
[1:19:02]
rewarded for that too.
[1:19:03]
>> Yes, financial incentives always help,
[1:19:05]
>> right? [laughter]
[1:19:07]
>> Okay, that's it. Thanks.
[1:19:08]
>> Thank you, Mr. Quinn. Any other
[1:19:09]
questions for Brandy? [clears throat]
[1:19:11]
>> Okay. Thank you so much for the update,
[1:19:13]
Brandy. We very much appreciate it,
[1:19:15]
>> Mr. Quinn. Do you want
[1:19:28]
» And as uh Supervisor Quinn is coming, I
[1:19:31]
think you all have a handout of at least
[1:19:33]
a portion of of what he's going to
[1:19:34]
present today that um just to to have in
[1:19:38]
front of you. I I don't think it's the
[1:19:40]
complete presentation, but it's most of
[1:19:42]
it.
[1:19:42]
>> Yeah, it it is the whole one actually.
[1:19:44]
So,
[1:19:44]
>> okay. So anyway, thank you for giving me
[1:19:46]
a couple minutes on the agenda today.
[1:19:48]
And uh you know, I think back to the
[1:19:51]
zoning ordinance and the post-mortem
[1:19:53]
that we did on that and I felt that we
[1:19:55]
didn't have a leader. We didn't have an
[1:19:57]
organization in place and we didn't have
[1:19:59]
clear roles and responsibilities. And
[1:20:02]
now that's water over the dam, but we're
[1:20:04]
facing a much bigger project, much
[1:20:06]
bigger risk, much more money at stake.
[1:20:09]
And we're going down the same path. and
[1:20:11]
we're about a year into the project and it's not at a point where you blame
[1:20:15]
anybody. It's a time where we can make a
[1:20:17]
midpoint correction and do some things
[1:20:19]
that'll really help us assure that the
[1:20:21]
project is going very well. And so there
[1:20:26]
are a couple things that I I it just
[1:20:28]
dawned on me, I guess, is all I can say.
[1:20:30]
I wish I had seen this before and I
[1:20:32]
didn't, but oh well. But I I begin I've
[1:20:35]
started seeing some things that that
[1:20:37]
aren't being worked on as quickly as or
[1:20:40]
as effectively as Bry's piece. So Bry's
[1:20:42]
piece is like the A+ of the effort right
[1:20:45]
now. And and but I'm seeing other pieces
[1:20:47]
that don't feel like we're getting after
[1:20:50]
them. And it could be well we don't have
[1:20:52]
a person to do the work or we don't have
[1:20:53]
the budget to do the work or or we're
[1:20:55]
not aware that we want to do the work.
[1:20:57]
But I I'll just give you a couple
[1:20:58]
examples. I think back to the
[1:21:00]
presentation that I did in January and I suggested that we look at this as an
[1:21:06]
educational ecosystem that includes our
[1:21:09]
schools but also the surrounding
[1:21:10]
schools. So, Patrick and Henry and
[1:21:12]
Western Virginia and Rono and and
[1:21:15]
looking at all of these as your um your
[1:21:17]
educational ecosystem and taking into
[1:21:20]
mind what you think you need to do given
[1:21:23]
the the capabilities that you already
[1:21:25]
have at these schools. And the example I bring up all the time is the welding
[1:21:31]
facilities at at Patrick and Henry. And
[1:21:33]
so, as you may recall from our tour,
[1:21:35]
it's a multi-million dollar complex. And
[1:21:38]
so, the question comes up, well, do we
[1:21:41]
need welding facilities? And and I don't
[1:21:43]
have an opinion on that today. I just
[1:21:45]
know it's something that needs to be
[1:21:47]
looked at. And upon further thinking, I
[1:21:50]
realized it's not black or white. It's
[1:21:52]
not yes, we have them or no, we don't. I
[1:21:55]
even thought of there could be
[1:21:56]
combinations and permutations. For
[1:21:58]
example, the first um room they have is
[1:22:01]
virtual welding. It's workstations in a
[1:22:04]
classroom where you become an excellent
[1:22:05]
virtual welder and you must become an
[1:22:08]
excellent virtual welder before you move
[1:22:09]
on to stick welding and then on to to
[1:22:11]
robotic welding. And so it occurred to
[1:22:13]
me, wow, one solution might be that you
[1:22:16]
only have virtual welding at RCTE
[1:22:19]
because it's pretty inexpensive and
[1:22:21]
you're getting into the big bucks when
[1:22:22]
you have the stick welding and the
[1:22:24]
robotic welding. And so the kids could
[1:22:26]
go in and they could learn virtual
[1:22:27]
welding and decide, is this really for
[1:22:30]
me? And if yes, well, they go on to
[1:22:32]
Patrick and Henry. So I I'm not
[1:22:34]
suggesting that that's the solution. And
[1:22:35]
I'm just bringing it up as as an uh to
[1:22:39]
help you understand the complexity in
[1:22:40]
some of these issues because that's just
[1:22:42]
one curriculum uh decision. The other
[1:22:44]
one I wanted to mention where again
[1:22:46]
where it doesn't seem like we're we're
[1:22:48]
getting after this as quickly as we
[1:22:50]
should when we talked to Dr. Hajes about
[1:22:53]
how they came up with a curriculum. He
[1:22:55]
said we interviewed every business
[1:22:57]
within 50 miles of the facility and we
[1:22:59]
asked them what they need and that
[1:23:01]
became the basis for their curriculum.
[1:23:03]
And so that's that's a well for me the
[1:23:06]
light bulb went on and I thought of
[1:23:08]
course that made sense. It was an
[1:23:10]
awesome way of thinking about your
[1:23:11]
curriculum and with the ven diagram I
[1:23:13]
put up. You remember I I foresaw
[1:23:16]
businesses being a huge driver of our of
[1:23:20]
curriculum here. And you recall his
[1:23:23]
degree is J O right he's totally focused
[1:23:26]
on on jobs and I even asked him with
[1:23:28]
that ven diagram about uh the the over
[1:23:32]
on the other side where the students
[1:23:34]
want it and the school can give it but
[1:23:37]
it's not what businesses need. I
[1:23:38]
wondered do you ever do any courses
[1:23:40]
there? And he said, "No, we don't do any
[1:23:42]
courses there. The community college can
[1:23:43]
do that." So, as I think about that, u I have anecdotal examples where u we
[1:23:52]
have the biggest IT services company in
[1:23:56]
the county that's in my area that's 10
[1:23:58]
miles away and they haven't been
[1:24:00]
interviewed by about their needs for the
[1:24:03]
CTE. And so, it's just an anecdotal
[1:24:05]
story, but it's a big company. It's
[1:24:07]
somebody that has a lot of a lot of
[1:24:08]
professional services need. And so it's giving me the sense that maybe we
[1:24:13]
don't have a methodical approach to
[1:24:16]
first do an inventory of all the
[1:24:17]
businesses and then do a priority of all
[1:24:19]
those businesses and then be have an a
[1:24:22]
system to interview them either in
[1:24:23]
person or or uh with a a paper survey.
[1:24:27]
And and so then I think about Bry's way
[1:24:30]
out in front and she's going to need
[1:24:31]
these feeds about what is it going to be
[1:24:34]
in this school. she's going to hit a
[1:24:36]
point where if she's hitting a wall and
[1:24:37]
she doesn't know the needs. And then the
[1:24:40]
last anecdotal story I'll tell you is I
[1:24:42]
just happened to run into somebody that
[1:24:44]
is from Western Virginia Community
[1:24:46]
College and and he is he is the person
[1:24:48]
that would be their point of contact for
[1:24:51]
this activity and he said nobody had
[1:24:53]
reached out to him and I I connected him
[1:24:55]
with Dr. seers and and that's great but
[1:24:58]
it makes me wonder how many more pieces
[1:24:59]
am I missing because I these are just
[1:25:01]
like happen stance in my travels that
[1:25:03]
I'm finding these so with that you could
[1:25:06]
put this up
[1:25:09]
[clears throat] so I really I just
[1:25:11]
intend to present this one slide but I
[1:25:14]
have backup and I'll explain how this
[1:25:15]
works so the biggest part of today is
[1:25:18]
I'm proposing that we should have a
[1:25:20]
project executive that's overseeing all
[1:25:23]
of the activities going on with the CT
[1:25:25]
and that that person should report into
[1:25:27]
Dr. Sears and Steve Sandy. And so this
[1:25:30]
gives you a feel for the the boxes of
[1:25:33]
activities and and I'm not wedded to
[1:25:35]
these boxes. There's no pride of
[1:25:37]
authorship in this. This is what I laid
[1:25:39]
out, but I would almost envision you put
[1:25:42]
a project executive in place and you
[1:25:44]
tell that person, what do you want? How do you see this organized? And and
[1:25:48]
it could very well be different than
[1:25:49]
this. Maybe they combine two boxes.
[1:25:51]
Maybe maybe I'm missing a box. Although
[1:25:53]
I've I've tested this on enough people
[1:25:55]
and nobody's had additions to this, but the I the idea is you can see the
[1:26:01]
breadth and scope of all the things that
[1:26:03]
have to be going on here and the
[1:26:05]
complexity and and there's there's huge
[1:26:08]
risks with this project and I I just
[1:26:10]
feel that without this person in place
[1:26:13]
that we're going to continue down the
[1:26:15]
path with various things like Bry's
[1:26:17]
piece is going very well, but what's
[1:26:19]
going on with the uh business community
[1:26:22]
and uh and that the outreach and so how
[1:26:26]
can I change the slides because I wanted
[1:26:27]
to go down to one more
[1:26:30]
oh maybe let me try this oh yeah here it
[1:26:32]
is okay so I just wanted to show you so
[1:26:35]
if I go back here this the second from
[1:26:38]
the left business and and community is one of the most complex because I
[1:26:45]
think I see it having a lot of of uh
[1:26:48]
school input and a lot of economic
[1:26:51]
development input
[1:26:52]
But you can see here, I I I wanted to
[1:26:54]
show I I wanted to show you that I have
[1:26:56]
some depth to these boxes. I actually
[1:26:58]
thought about what would go in each of
[1:27:00]
these boxes. And I can tell you for sure
[1:27:02]
this isn't complete. I've tested it on a
[1:27:05]
few people and and nobody's had other
[1:27:07]
input to it. So this is what we have
[1:27:09]
today. But I I would envision once you
[1:27:11]
get into this, you would be tweaking
[1:27:13]
some of these. But you can see, you
[1:27:15]
know, I have the, you know, that
[1:27:17]
inventory and engaging employees within
[1:27:19]
the 50-mi radius and the all this work
[1:27:22]
with the regional colleges, I think, is
[1:27:24]
really important. And the marketing for
[1:27:26]
the 1% sales tax referendum, the the
[1:27:29]
path we're going down now with that,
[1:27:31]
we're not going to get it. It's just a
[1:27:33]
shame. We're not going to It's not Dr.
[1:27:35]
Sears, it it's not a critique of him. He
[1:27:38]
doesn't have enough on there. We have
[1:27:39]
three town halls at the schools that
[1:27:41]
need HVAC programs and it's not enough.
[1:27:44]
You're not going to get people excited
[1:27:46]
to go to a town hall and they hear about
[1:27:48]
an HVAC system. And so there's there's
[1:27:51]
work there that needs to be done. But when I talk about needing a leader,
[1:27:57]
it's that project executive. When I talk
[1:27:59]
about an organization, it's that
[1:28:01]
executive managing those five boxes of
[1:28:03]
activities that go on. And when I talk
[1:28:06]
about roles and responsibilities, it's looking at each one of these points
[1:28:10]
and deciding, well, first, am I going to
[1:28:12]
do it or not? Or maybe I tweak the text,
[1:28:15]
but who's going to do it? Who who the
[1:28:17]
who's the person that's responsible for
[1:28:20]
this bullet? That that's what I mean by
[1:28:22]
clear roles and responsibilities at the
[1:28:25]
end of this. Every one of these has um
[1:28:27]
has a person. And I put I the Franklin
[1:28:30]
Center is down at the bottom. Not ne
[1:28:32]
it's not in order of importance. they
[1:28:34]
were part of my original slideshow. I I
[1:28:36]
see them as being an incredibly
[1:28:38]
important part of this and I'm not sure
[1:28:40]
how they fit in. This is where they fit
[1:28:42]
in to me, but maybe somebody says,
[1:28:43]
"Well, this should be a box all by
[1:28:45]
itself reporting into the project
[1:28:46]
executive." So, so that's why to me this
[1:28:49]
is kind of fluid, but it begins to lay
[1:28:51]
out um a leadership model, an
[1:28:54]
organization model, and and gives you
[1:28:57]
enough content so you can establish
[1:28:58]
roles and responsibilities to get the
[1:29:00]
work done. So, that was everything I
[1:29:03]
have.
[1:29:04]
>> Okay, Dan, that's great. Thank you so
[1:29:05]
much for all the work you've put into
[1:29:07]
this. I'm going to open the floor for
[1:29:09]
questions, comments, Mr. Carter.
[1:29:10]
>> Yeah, thank you. Thank you, Dan. That
[1:29:12]
was a good presentation. I just had a
[1:29:14]
couple comments. I was on the board at
[1:29:16]
Patrick Henry when we started that
[1:29:18]
complex and uh that virtual welding
[1:29:22]
training
[1:29:24]
piece of the puzzle. I think that's
[1:29:26]
perfect for the high school. I don't
[1:29:28]
know liabilitywise if they can advance
[1:29:32]
to a welding booth and all that. Um was one thing. I think an IT curriculum
[1:29:38]
for that school is going to be real
[1:29:40]
important for future future jobs. And
[1:29:43]
that 1% sales tax
[1:29:46]
if if we want that to pass we have got
[1:29:49]
to step up some marketing for that
[1:29:51]
because people are telling me they are
[1:29:53]
not going to vote for that.
[1:29:55]
>> Mhm. So, we need to I don't know what we
[1:29:58]
need to do, but we need to help the
[1:29:59]
school system market that to get that
[1:30:01]
through. And that's all I had.
[1:30:04]
>> Okay. Thank you, Mr. Carter. Mr.
[1:30:05]
Jameson,
[1:30:06]
>> I agree with Mike. I want to have
[1:30:08]
welding virtual welding. I think that
[1:30:10]
would work great here for the uh county
[1:30:13]
and all this um
[1:30:14]
>> you said it would work great in the
[1:30:15]
county. I think so.
[1:30:16]
>> Yeah. I I had no idea, but it but it
[1:30:19]
made me realize it wasn't black or
[1:30:21]
white. It's here or not here. There
[1:30:23]
various combination and permutations
[1:30:25]
that could work
[1:30:26]
>> there. Again, you talk to the you talk
[1:30:28]
to Virginia Western, Patrick Henry, they
[1:30:31]
can give you some guidance on it. Give
[1:30:33]
the school or whoever and what they
[1:30:36]
think of it. Get their opinion of it.
[1:30:38]
>> The the project executive, what do you
[1:30:40]
see, Dan, as far as what kind of
[1:30:44]
experience do they need? I mean, what do
[1:30:46]
you
[1:30:48]
management? I understand. How about
[1:30:50]
construction? I mean, is this is this
[1:30:52]
just the um itinerary of what's going to
[1:30:56]
be taught or what you they would be in
[1:30:59]
charge of that or are you talking about
[1:31:00]
the construction also?
[1:31:02]
>> No, I I well it's I I think it's a very
[1:31:04]
senior executive. It's not a junior
[1:31:06]
person. Their man their management and
[1:31:08]
leadership skills would be huge. That
[1:31:11]
ability to manage a breath of functions.
[1:31:14]
Um here you you can see the diversity of
[1:31:16]
the functions. I feel like the
[1:31:18]
facilities and construction activity
[1:31:21]
that we have going on, especially with
[1:31:23]
the construction manager we put here.
[1:31:25]
This is excellent. This is I I have no
[1:31:28]
change. I mean, I talked about a couple
[1:31:29]
questions, but but this is perfect. And
[1:31:31]
so now you have a really strong person
[1:31:34]
here reporting into the project
[1:31:36]
executive. Yes, I I would think that
[1:31:38]
person needs some construction
[1:31:41]
experience. However, their leadership
[1:31:43]
and management capabilities across a a
[1:31:45]
wide and very diverse set of activities
[1:31:47]
is more important because you have this
[1:31:50]
area so well taken care of now.
[1:31:53]
>> So, but it's mainly curriculum they're
[1:31:56]
looking at, right? Is that what you're
[1:31:57]
thinking? That's
[1:31:59]
>> No, I got it wrong.
[1:32:00]
>> Uh, so, so let's go from the left. You
[1:32:02]
have operations and finance, right?
[1:32:04]
There's this is a box where where you're
[1:32:07]
looking after all of the finances for
[1:32:10]
this school. you need a whole separate
[1:32:13]
um ledger, if you will, wi with um a
[1:32:17]
revenue and income potentially where
[1:32:18]
you're managing this. I don't think that
[1:32:20]
we right now I don't think that we're
[1:32:22]
managing everything under the CTE as a
[1:32:25]
separate function and we the board of
[1:32:27]
supervisors should want that. We we
[1:32:29]
should want to know what is this costing
[1:32:31]
us? What have we spent? And so this
[1:32:33]
operation operation and finances is all
[1:32:36]
about uh that activity. the the I I
[1:32:40]
covered business and community, but the
[1:32:41]
program and education, the the
[1:32:43]
curriculum, the staffing, the program
[1:32:45]
development. I see a lot of that being
[1:32:47]
managed by Dr. Sears and uh and then uh
[1:32:51]
govern governance when you look at it's
[1:32:54]
best to just go down through and look at
[1:32:55]
each of the backup slides to see what's
[1:32:58]
in there to really understand. But the
[1:33:00]
other thing that occurred to me as I got
[1:33:02]
into this was I realized it's really not
[1:33:06]
our role to say Steve and Dr. Sears you
[1:33:10]
will have this person right I think it's
[1:33:13]
our role to tell them we need a leader a
[1:33:17]
clear leader and if if Dr. Ste Sears and
[1:33:20]
Steve said we can do that we don't need
[1:33:23]
this person okay but but my sense is
[1:33:26]
they don't have the bandwidth I I don't
[1:33:28]
think Dr. Sears has the bandwidth. I I
[1:33:30]
haven't heard from Steve, but I don't
[1:33:32]
think they have the bandwidth to be
[1:33:33]
overlooking of this whole project. But my sense was it's not our job to say
[1:33:40]
this is how the organization should be
[1:33:41]
set up, but it it is our job to say you
[1:33:44]
need a leader, you need an organization,
[1:33:46]
and you need clear roles and
[1:33:48]
responsibilities under that so everybody
[1:33:49]
knows what they're doing as we we build
[1:33:52]
this massive program.
[1:33:55]
>> Mr. Tatum.
[1:33:56]
>> Dan, thank you for this presentation. I
[1:33:58]
know you've put a lot of work and a lot
[1:34:00]
of thought into this. Um, the virtual
[1:34:02]
welding I think is outstanding uh
[1:34:05]
concept, outstanding idea and would be a
[1:34:08]
great addition to the pro to their uh
[1:34:10]
existing program, but I I also think
[1:34:13]
that they currently have a welding uh
[1:34:16]
booth setup that they're currently
[1:34:19]
using. They're at their current
[1:34:20]
location. Now, granted, it is small and
[1:34:23]
has its limitations. Um I I think that
[1:34:27]
you know the overall setting of of the
[1:34:30]
curriculum and everything that's that's
[1:34:34]
we can make recommendations but of
[1:34:35]
course we know the school they set that
[1:34:39]
and uh um you know I don't think that we
[1:34:42]
need to necessarily say well all you're
[1:34:46]
going to do all we're going to permit is
[1:34:48]
virtual activities at the high school
[1:34:51]
level. If you want to take stick
[1:34:53]
welding, you've got to go to
[1:34:54]
[clears throat] Patrick Henry uh when
[1:34:56]
they're already offering stick welding
[1:34:58]
and in in some capacity. I think we need
[1:35:01]
to look at what we currently offer and
[1:35:04]
we need to look and and we need to have
[1:35:06]
we need to sit down with our partners uh
[1:35:09]
on the school board and see what the
[1:35:11]
students are requesting
[1:35:13]
>> because we can all we can have the Taj
[1:35:15]
Mahal out there and if the students
[1:35:16]
don't want to take it, they're not going
[1:35:17]
to take it. Oh, [clears throat] you
[1:35:18]
know, we need to see where their
[1:35:20]
interest is and and like you said, uh
[1:35:24]
[clears throat] earlier, it doesn't do
[1:35:25]
us much good to train them for the skill
[1:35:28]
and then not be able to use it for a
[1:35:30]
job.
[1:35:31]
>> And [clears throat] and that is 100%
[1:35:32]
true. But on the other side, if they
[1:35:35]
don't have the interest in it, you can't
[1:35:38]
force them to take take the the class.
[1:35:41]
>> And so, we need to we need to find a
[1:35:43]
happy medium somewhere in there. And and
[1:35:46]
I think that's going to be all of us
[1:35:48]
sitting down,
[1:35:50]
putting our heads together, and working
[1:35:52]
with the school board with uh and like I
[1:35:56]
said, I love the idea of having the
[1:35:58]
project executive, someone as a overseer
[1:36:01]
of the whole whole program because that
[1:36:04]
to me takes a whole lot of pressure off
[1:36:06]
of Mr. Sandy and and Dr. seers because
[1:36:09]
uh they they have a pretty big uh duty
[1:36:14]
as theirself running the county and
[1:36:16]
running the school system and uh
[1:36:20]
I just applaud what you've put together
[1:36:22]
here, but I think we need to make sure
[1:36:23]
that we take a look at what we have.
[1:36:26]
>> We [clears throat] need to take in
[1:36:27]
consideration the
[1:36:29]
uh interest of the students and you know
[1:36:33]
we it may be as simple doing a poll of
[1:36:36]
the students. Hey, what would you what
[1:36:38]
would you be like to see offered? Uh you
[1:36:43]
we might be surprised [laughter] and it
[1:36:46]
may you know you you know I think that's
[1:36:48]
where we need to start because that's
[1:36:49]
who we're building this for
[1:36:51]
>> is our students and uh because I'm not
[1:36:54]
taking any classes there. Uh, I already
[1:36:56]
know how to stick weld and and not real
[1:36:59]
good, but I I can put two pieces of
[1:37:01]
metal together. [clears throat] But, uh,
[1:37:03]
you know, we need to we need to you make
[1:37:06]
sure that we keep our students involved
[1:37:09]
in this, too. Uh, because that's who
[1:37:11]
we're building it for. But, thank you
[1:37:13]
again. You put a lot of hard work into
[1:37:14]
this and I know you put a lot of thought
[1:37:16]
into it.
[1:37:18]
>> A couple points just um for
[1:37:19]
clarification. So, I was using the
[1:37:22]
welding as just an example. It wasn't I
[1:37:26]
wasn't saying we should have a virtual
[1:37:28]
facility or not. I was just trying to
[1:37:29]
point out wow you look at one this is
[1:37:32]
one thing welding right and and it's not
[1:37:35]
as easy as black or white yes or no you
[1:37:39]
all of a sudden as as you start
[1:37:41]
dissecting it you realize wow it could
[1:37:43]
be we do virtual welding here and we
[1:37:46]
don't do stick and robotic. It could be
[1:37:47]
I I don't have a recommendation there.
[1:37:49]
So I just want to be clear that's not my
[1:37:50]
I'm not making a recommendation. I'm not
[1:37:52]
smart enough to make a recommendation in
[1:37:54]
that area. I just as I thought about it,
[1:37:56]
I I was able to uh do that. The other
[1:37:58]
thing uh that I think about. So, I think
[1:38:01]
it's fine to interview the students, but
[1:38:04]
they don't know what they don't know.
[1:38:06]
You know, I think I I came out of school
[1:38:08]
and they were history majors and and
[1:38:10]
they're bummed out that they don't have
[1:38:11]
a job. And I hope nobody here is a
[1:38:13]
history major, but but they didn't know
[1:38:15]
going into this that's not going to give
[1:38:17]
you a job, right? And there in that vin
[1:38:20]
diagram I put together where you're
[1:38:21]
looking at what the businesses need. If
[1:38:23]
a business comes out and they say, "Hey,
[1:38:25]
look, I'll pay you $100,000 if you do
[1:38:27]
this." Well, suddenly you're going to
[1:38:29]
have a lot of students interested in
[1:38:31]
doing that, right? They didn't they
[1:38:32]
didn't even know about that. A lot of
[1:38:33]
the stuff in that over on the business
[1:38:35]
side is they don't know what they don't
[1:38:37]
know. And so they're only if you if you
[1:38:40]
do the survey, they're only going to
[1:38:41]
answer
[1:38:43]
from their small little sphere. And
[1:38:45]
that's why I think it's so important to
[1:38:47]
have the businesses and it's very
[1:38:49]
unclear to me so far how that's going to
[1:38:51]
be done. Is it the school? Is it
[1:38:53]
economic development? Is it on the two
[1:38:54]
as a partnership? But but I would just
[1:38:57]
propose it's it's huge. We have to have
[1:39:00]
the business development. If you talk to
[1:39:02]
Dr. Hodgeges, he he couldn't even do
[1:39:04]
this without the business development or
[1:39:06]
the the business.
[1:39:07]
>> Yeah, I I completely agree. In fact, I
[1:39:10]
recall some numbers that was given to
[1:39:12]
this board, and I want to say it was in
[1:39:15]
2017 or 2018 that there was a study
[1:39:18]
done, and there were over 10,000
[1:39:21]
job openings within a 60-mi radius of
[1:39:24]
here for machinists.
[1:39:28]
>> And those are good paying jobs.
[1:39:29]
>> Yep.
[1:39:30]
>> And it's a big demand.
[1:39:32]
>> I know. And it makes the other kind of
[1:39:34]
crossover I'll talk about just is
[1:39:37]
summit. So you have people that are
[1:39:38]
looking to bring their business in here
[1:39:40]
and they want to know do you have
[1:39:42]
workers? In a lot of case we don't have
[1:39:44]
the workers. We don't have the
[1:39:45]
workforce. They want to they're looking
[1:39:46]
for an educated skilled workforce that
[1:39:48]
they can drop into this. And and you
[1:39:51]
think about what Patrick and Henry uh
[1:39:52]
community college was doing. They have
[1:39:54]
rooms set up where where the company can
[1:39:56]
put in their equipment and be trained on
[1:39:58]
their equipment. And so so yes, they
[1:40:00]
might not be trained today, but they can
[1:40:01]
be trained by the time you open up your
[1:40:03]
factory. And so I think it it would make
[1:40:06]
some of you in other areas in the county
[1:40:08]
much more attractive if we start
[1:40:10]
building that base of skills. We have a
[1:40:13]
really competent workforce because we
[1:40:15]
don't now. They come out of high school
[1:40:16]
and and they they're not ready to do
[1:40:18]
anything. It's unfortunate. It's not and
[1:40:20]
it's not a criticism of the high school.
[1:40:21]
That's just how high schools are, right?
[1:40:23]
They don't give you that degree J O.
[1:40:26]
>> Yeah.
[1:40:27]
>> Mr. Mitchell.
[1:40:29]
Um, I think the biggest takeaway from
[1:40:31]
this and what Dan pointed out is
[1:40:33]
[clears throat]
[1:40:35]
when you break it down into these
[1:40:36]
sections, we want hard clad.
[1:40:39]
We want to know who is going to be
[1:40:40]
responsible for delivering this section
[1:40:44]
and we we want to be able to go to that
[1:40:45]
person and we want to be able to see it
[1:40:47]
happening. Um, I would be cur and and
[1:40:51]
he's also right in saying that it's not
[1:40:53]
our place to set that up. staff's place,
[1:40:56]
but it is our place to say, well, you
[1:40:57]
know, along the way, we want to see
[1:40:59]
this. We want to see how this is
[1:41:01]
progressing. We want a we want you to
[1:41:03]
take these five pieces and we want
[1:41:06]
updates on them. I would be curious for
[1:41:08]
staff to take this
[1:41:12]
cross reference with the school system
[1:41:14]
and write in on these things. Who do you
[1:41:16]
see doing this? Who do you see hand in
[1:41:19]
the the way you're visioning it now? Who
[1:41:21]
do you see handling this? Who do
[1:41:23]
[clears throat] you see handling this?
[1:41:25]
Who do you think you're going to need?
[1:41:26]
And you know, at the at the end of the
[1:41:28]
day, you're going to run into this wall
[1:41:29]
of the schools. They're going to have
[1:41:32]
this curriculum. I'm sure it's set by
[1:41:33]
the state and stuff and things that have
[1:41:34]
to go into the CTE. We can't we can't
[1:41:37]
decide that for ourselves, but that'd be
[1:41:38]
good information, too. So, you know, you
[1:41:40]
go to the pieces of say, "Okay, so
[1:41:41]
program education, that's the school
[1:41:43]
system side. Who do they see?" And, you
[1:41:45]
know, [clears throat] and go down
[1:41:46]
through there and show us that who they
[1:41:48]
plan on delivering it. And [snorts] if
[1:41:49]
they're thinking we need if we need to
[1:41:51]
work this project executive into it, we
[1:41:53]
need to we need to decide that because I
[1:41:56]
can also see where you're looking down
[1:41:58]
the line and we get five years down the
[1:42:00]
road and like we we missed this. We
[1:42:02]
didn't we didn't pay any attention to
[1:42:05]
this at all. And maybe if we'd have had
[1:42:08]
if we had somebody's name written right
[1:42:10]
here, we'd say, "Oh, we missed this
[1:42:11]
part. Let's go find this guy and ask him
[1:42:13]
what why didn't you do this?"
[1:42:15]
>> That's exactly what's going to happen,
[1:42:16]
Nick. down the road there's a piece
[1:42:18]
missing. We didn't do this.
[1:42:19]
>> I can and why didn't we do it? And then
[1:42:21]
you're blaming somebody. Right now you
[1:42:23]
have a chance midcourse set it up like
[1:42:25]
you said who's doing all these pieces.
[1:42:27]
It'd be very interesting to look at.
[1:42:29]
>> So I I would like to see staff, you
[1:42:31]
know, and take the and make the changes
[1:42:32]
you think. I I mean Dan's is just a
[1:42:34]
template. Take it and go with the school
[1:42:37]
systems and and see see how y'all vision
[1:42:40]
these things working out.
[1:42:42]
>> So thank you. Is that all Mr. Mitchell?
[1:42:44]
>> Yes, ma'am.
[1:42:45]
>> Um Mr. Mr. Quinn, again, thank you for
[1:42:47]
this. Um, I have done, um, two major
[1:42:51]
middle school renovation projects in my
[1:42:54]
career, and I think what you've laid out
[1:42:57]
is precisely, um, the mapping of
[1:43:00]
ensuring that we will have a quality,
[1:43:03]
wellexecuted
[1:43:04]
project. Um, this is a generational
[1:43:07]
project for our citizens, businesses,
[1:43:10]
and especially our students. Um, and I I
[1:43:13]
really do think, you know, I've always
[1:43:15]
been a big proponent of a construction
[1:43:17]
project manager. This project, as I have
[1:43:21]
reviewed it, and when you shared your
[1:43:23]
slides with me and so forth, this
[1:43:25]
project is is reaching beyond the more
[1:43:29]
thought I've given it, beyond the, you
[1:43:31]
know, the typical um construction
[1:43:33]
manager approach. They're certainly
[1:43:35]
inshed in this. Uh but with regard to
[1:43:38]
things like curriculum, the schools are
[1:43:40]
going to have to be at the table without
[1:43:43]
question with Mr. Bumgardner in, you
[1:43:46]
know, looking at what we're doing
[1:43:47]
curriculum wise. Uh but to me, in
[1:43:50]
developing the programmatic phase of
[1:43:52]
this project, it's going to have to be
[1:43:55]
that we're doing that 50 mile um you
[1:43:58]
know, circumference of business
[1:44:00]
interviews. it's going to have to be
[1:44:02]
that we are trying to caucus our
[1:44:04]
families and students at the high school
[1:44:07]
level. Um, and looking um, you know,
[1:44:10]
looking beyond what we're currently
[1:44:12]
doing, what what with what we're doing,
[1:44:14]
what's working, where the waiting list,
[1:44:15]
etc. But I also think a big piece of
[1:44:18]
this because we've we've talked about
[1:44:20]
this school and this project being so
[1:44:23]
generationally driven. Um, I think that
[1:44:26]
we've got to make sure we're we're doing
[1:44:28]
this project with vision in mind. Um and
[1:44:31]
that is going to come in large part I
[1:44:32]
think from seeing what the businesses in
[1:44:34]
today's world are demanding and
[1:44:37]
expecting out of their employees. um
[1:44:39]
from the inception of this discussion,
[1:44:41]
you know, gosh, a long time ago, uh we
[1:44:45]
talked about this business modeling
[1:44:46]
approach, you know, to bring if a
[1:44:49]
business wants to partner, you know,
[1:44:51]
with Franklin County that we could set
[1:44:53]
them up, um and we could bring students
[1:44:55]
in on a mentoring basis and then maybe
[1:44:57]
somewhere along the way we could ensure
[1:44:59]
that student or that company could say
[1:45:01]
if you train and you get, you know, you
[1:45:03]
get your certification, we want you, you
[1:45:06]
know, it it's more intentional, right?
[1:45:08]
So, um I think I am in support of the
[1:45:12]
project executive position. One question
[1:45:15]
I do have is how do you see because I
[1:45:18]
I'm I'm thinking are you vision
[1:45:20]
envisioning this as a contractual
[1:45:22]
position or full-time employee?
[1:45:25]
>> I I believe it's a full-time role.
[1:45:27]
>> And what do they do after this? Well,
[1:45:30]
that so that part I'm not sure about
[1:45:32]
because when I think about the person
[1:45:34]
that I need to manage the this whole
[1:45:37]
project as it is today, that's that's
[1:45:39]
one person. But then I see, okay, now
[1:45:42]
the school's built, right? We this Bry's
[1:45:45]
box is is facilities management. It's a
[1:45:48]
Bry's box goes from a massive
[1:45:51]
undertaking to a tiny piece. And so I
[1:45:54]
see that that person could change over
[1:45:56]
time. Or maybe maybe Steve and Dr. Sears
[1:45:59]
decide they don't need that person. I
[1:46:01]
still think you'll need that person
[1:46:02]
going forward, but I do see I do see the
[1:46:05]
roles and responsibilities for that
[1:46:06]
person changing and so we'd have to see
[1:46:08]
if the person you put in there in the
[1:46:10]
beginning was able to transition to this
[1:46:12]
new role or not. I I can't predict that.
[1:46:15]
>> Well, I've seen some localities that
[1:46:17]
have a pro a CIP, you know, project
[1:46:21]
leader, if you will. um you know
[1:46:24]
certainly involved at the project
[1:46:25]
construction and development level but
[1:46:28]
that person continuing in an oversight
[1:46:31]
role all the while I mean if if we get
[1:46:33]
this 1% we'll be able to you know
[1:46:37]
consecutively work on school projects
[1:46:39]
that are going to require you know what
[1:46:41]
we feel is an accountable and efficient
[1:46:43]
measure. Brandy is excellent. We're so
[1:46:46]
blessed to have you. [clears throat] Um
[1:46:48]
and Steve has a full plate. Um, and I
[1:46:52]
think my message is is we want to make
[1:46:54]
sure that the burden on our staff is not
[1:46:57]
so great. Um, that, you know, we're all
[1:47:01]
human. Um, and I think that this board's
[1:47:03]
got a responsibility to make sure that
[1:47:06]
the money um that we uh extend on this
[1:47:10]
project um is money that's efficiently
[1:47:14]
uh scoped out and that it's producing
[1:47:16]
the results um that we expect it to be.
[1:47:19]
with those expectations being out, you
[1:47:21]
know, put out in the front commencement
[1:47:24]
of the project. So, um I I like this
[1:47:27]
very much. Um I I do think just this is
[1:47:31]
very preliminary thinking and I don't
[1:47:33]
mean to be redundant, but I do think
[1:47:35]
that this position could take some
[1:47:37]
roles. I mean, when I think about what's
[1:47:39]
going on at the landfill, you know, when
[1:47:42]
I think about, you know, the capital
[1:47:44]
improvement projects that will be going
[1:47:46]
on in public safety, when we think
[1:47:48]
about, you know, more uh infrastructure
[1:47:50]
type projects at Summit View, um our
[1:47:54]
park system and so forth, I think that
[1:47:56]
there are roles um that could be
[1:47:59]
redefined perhaps um and utilized um
[1:48:02]
under the you know the opaces of capital
[1:48:05]
improvement planning. So that's kind of
[1:48:08]
me just kind of taking a first blush
[1:48:10]
look at that that question that I asked
[1:48:12]
you. Um but uh
[1:48:14]
>> and and I agree I agree with that. Just
[1:48:16]
going back for a second like how do you
[1:48:18]
see this project executive evolving? One
[1:48:20]
thing I would say is I see that person
[1:48:23]
always being needed because you have the
[1:48:25]
school and the county and lots of stuff
[1:48:27]
going on in two places and how do you
[1:48:29]
make how do you have somebody at the top
[1:48:31]
that's overseeing what's going on?
[1:48:34]
>> Yeah. and the curriculum piece, you
[1:48:36]
know, the schools and, you know, should
[1:48:38]
have a large, you know, play a large
[1:48:41]
role in curriculum. This is what they
[1:48:44]
do. Um, and then you've got your SOQs,
[1:48:47]
um, that have, you know, defined,
[1:48:48]
[clears throat]
[1:48:49]
um, expectations and eligibilities for
[1:48:52]
CTE programs for the students in the
[1:48:54]
Commonwealth. So, but there's also those
[1:48:57]
other avenues that we're discussing
[1:48:59]
which you know that to me the curriculum
[1:49:01]
piece the program and education piece
[1:49:02]
you articulate to me that really becomes
[1:49:05]
a a very collaborative discussion with
[1:49:08]
the school system with Curtis with doing
[1:49:12]
all of those exercises internally within
[1:49:14]
the school division to assess where
[1:49:16]
they've been where they are um you know
[1:49:19]
the solicitation of of surveys and what
[1:49:22]
have you um so I I think you know we
[1:49:25]
went into this project saying you know
[1:49:27]
the board of supervisors is going to
[1:49:29]
manage this project when I think this
[1:49:31]
board has been very intentional about
[1:49:34]
that. Um and the schools are our partner
[1:49:36]
in this without question. And I think
[1:49:39]
the schools are going to be able to
[1:49:40]
integrate uh and complement the work um
[1:49:44]
from a curriculum standpoint and for
[1:49:47]
identification of need and to help um
[1:49:50]
put that that wide net out um you know
[1:49:53]
to work with the county and economic
[1:49:55]
development office and with Brandy to
[1:49:58]
make you know to ascertain all of those
[1:50:00]
more detailed questions. But in a in a
[1:50:02]
model that's set up like this, um, to
[1:50:05]
me, it gives me confidence that we'll
[1:50:09]
get the overview and we'll be able to
[1:50:11]
see what's balancing and what's not
[1:50:13]
balancing, you know, and we'll have an
[1:50:15]
accountability piece built in through
[1:50:17]
that project executive. Um, so I like
[1:50:19]
this and I appreciate your time in
[1:50:22]
putting this together.
[1:50:23]
>> Yeah. And the curriculum piece, it's
[1:50:24]
incredibly complicated, I think. Um,
[1:50:27]
it's where that's where where a lot of
[1:50:29]
decisions have to be made and
[1:50:31]
>> and you know I I think back to my my
[1:50:34]
discussions with Dr. Hodgeges and
[1:50:37]
>> and and the comment about we need to
[1:50:38]
pull the students. He said you know
[1:50:41]
every year they come to me and they say
[1:50:43]
they want dental hygienists. They want a
[1:50:45]
dental hygienist program. And he said
[1:50:47]
we've surveyed the whole area and we
[1:50:49]
only need three. Yeah.
[1:50:50]
>> And so we need 12 people. We need a
[1:50:54]
demand of 12 dental hygienists before we
[1:50:57]
will offer a course. Now, maybe our
[1:51:00]
rigor isn't exactly what Dr. Hajes does,
[1:51:03]
but you can still think about it and
[1:51:05]
say, "Wow, do I really want to offer a
[1:51:07]
dental hygienist program if we only need
[1:51:09]
three? Where are the other nine people
[1:51:11]
going to go?" You know, or you're are
[1:51:12]
you really going to teach a program for
[1:51:14]
three? And and also I the other comment
[1:51:16]
I I'm a huge fan of focusing on the
[1:51:20]
business needs with the student demands
[1:51:23]
almost being secondary and and maybe it
[1:51:26]
can't be as strong as that. Maybe you
[1:51:28]
have to build some of those student
[1:51:30]
needs in but but to the extent you're
[1:51:32]
doing that they're coming out of the
[1:51:33]
program without a job. Are they okay
[1:51:35]
with that? You know that and and but
[1:51:36]
that whole the whole curriculum it's
[1:51:38]
really in two boxes here. And maybe one box ends up being all about
[1:51:42]
curriculum. I'm not really sure. That's
[1:51:43]
why I said these five boxes are in my
[1:51:45]
mind they're kind of fluid. They're not
[1:51:47]
fixed, but that that guy at the top or
[1:51:49]
woman at the top is the one that would
[1:51:51]
>> Yeah. I mean, we've got to be responsive
[1:51:53]
to the needs of Franklin County and
[1:51:56]
surrounding areas in terms of that net,
[1:51:58]
you know, going out over the business
[1:52:00]
communities. Um, and we know things here
[1:52:04]
in our county that we do well. and you
[1:52:07]
know and I can see that maybe this new
[1:52:10]
CTE uh center and the associated
[1:52:12]
[clears throat] curriculum could be on a
[1:52:14]
continuum with Patrick and Henry um that
[1:52:17]
you know that there is clear
[1:52:19]
communication and deliberate and
[1:52:20]
intentional planning curriculum to build
[1:52:23]
to the secondary level. So, I think I
[1:52:25]
think the sky's is the limit in terms of
[1:52:27]
what we can do, but I don't think and my position is we we need as much
[1:52:32]
information, guidance, and oversight as
[1:52:35]
we can get. Um, and we'll have an
[1:52:37]
outstanding generational project as an
[1:52:40]
outcome.
[1:52:41]
>> Good.
[1:52:41]
>> Anybody else have anything? Mr. Carter,
[1:52:43]
>> I don't disagree with a lot of what's
[1:52:45]
been said here, but and and I think
[1:52:48]
maybe a project executive might be a
[1:52:51]
good thing for this, but I personally
[1:52:54]
don't see us creating a full-time
[1:52:57]
another growing government, highpaying
[1:53:00]
county [clears throat] position when
[1:53:01]
we've got Brandy, uh the school systems
[1:53:04]
got Curtis and Mr. law. I think a
[1:53:08]
project executive might be good to get
[1:53:10]
us through this, but
[1:53:12]
>> I don't see that myself as a long-term
[1:53:16]
>> position.
[1:53:17]
>> Okay. I think that's a great point. Um,
[1:53:20]
that's why I started out by asking if it
[1:53:22]
was your opinion that it be
[1:53:23]
contractually driven or on a full-time
[1:53:26]
employee basis. And, you know, I think
[1:53:28]
that there are variables within that decision alone that need to be
[1:53:32]
explored. um you know, just so we get
[1:53:34]
the outcomes we're looking for.
[1:53:36]
>> And I'm not trying to crush it. I just
[1:53:39]
think
[1:53:39]
>> No, you're fine.
[1:53:40]
>> We're [clears throat] growing government
[1:53:42]
here and I don't much like that.
[1:53:44]
>> So, would you be in favor of a
[1:53:45]
contractual
[1:53:46]
>> position at this level?
[1:53:48]
>> Probably.
[1:53:49]
>> I mean, we're just conjecture today.
[1:53:51]
We're just in conjecture. Uh and
[1:53:53]
>> I for me, it'd be easy to make that
[1:53:54]
decision once I see Steve's thoughts on
[1:53:57]
going through and seeing what they come
[1:53:59]
back and say.
[1:54:00]
>> Absolutely. Yeah. just there's another
[1:54:03]
burden for you to carry. [laughter]
[1:54:06]
>> Um do you have anything to say, Mr.
[1:54:08]
Sandy?
[1:54:09]
>> Well, I I have a lot of thoughts. I
[1:54:12]
mean, I think um you know, we we had
[1:54:15]
talked briefly and I think he's hit
[1:54:18]
a lot of those highlights and a lot of
[1:54:20]
the pillars of what we need to consider
[1:54:22]
through the CTE project. I think I I
[1:54:26]
appreciate um Mr. Mitchell's comments. I
[1:54:28]
think let us let us take this and kind
[1:54:30]
of work through it because I think what
[1:54:33]
you'll find is we're already doing a
[1:54:34]
number of these things,
[1:54:36]
>> okay,
[1:54:36]
>> that maybe you you just aren't aware of
[1:54:38]
that are happening. And so I think but I
[1:54:41]
think what we will find is through this
[1:54:43]
process, we'll find some of those pieces
[1:54:45]
and nuggets that, you know, either we
[1:54:47]
didn't think of or we're not spending
[1:54:48]
enough attention on. But, you know, we could come back like I could have
[1:54:52]
Danny and probably don't want to do it
[1:54:54]
today, but I could have her come up and
[1:54:55]
speak to all the partnerships that are
[1:54:57]
currently in place and how the high
[1:54:59]
school is already working with the
[1:55:00]
community college on certain programs.
[1:55:02]
And so, a lot of those things are, you
[1:55:04]
know, already in place. So, I don't want
[1:55:05]
it to sound like uh, you know, this work
[1:55:07]
session to sound like none of this is
[1:55:10]
being considered or is being, you know,
[1:55:13]
planned because that's certainly not the
[1:55:15]
case here. And so I think great advice
[1:55:18]
to take this kind of put put the names
[1:55:21]
to and the folks who would be working on
[1:55:23]
these types of things and these type of
[1:55:24]
activities and kind of be able to report
[1:55:27]
back to you guys kind of with some
[1:55:30]
additional thoughts of of areas we need
[1:55:32]
to spend more attention on and areas
[1:55:33]
that maybe weren't considered and then I
[1:55:36]
think that can lead us to hey we do need
[1:55:38]
some help here or the school needs help
[1:55:41]
over here for this particular aspect of
[1:55:43]
>> so I think yeah I a lot of great ideas
[1:55:46]
and and we probably talked an hour and a
[1:55:48]
half when when we first looked at it um
[1:55:51]
you know with just kind of thinking
[1:55:53]
through all the different things and
[1:55:54]
I'll just reiterate it's a a very
[1:55:57]
complex project and and this is only the
[1:55:59]
CTE part so I don't want us to also lose
[1:56:01]
focus of the rest of the building
[1:56:03]
>> exactly
[1:56:03]
>> that that we're also working on and and
[1:56:06]
developing and so there's going to be
[1:56:07]
things that we have to decide
[1:56:09]
>> in particular with the CTE is this the
[1:56:12]
school's facility
[1:56:14]
is it owned by the county and the
[1:56:15]
schools are leasing it. Is it a
[1:56:17]
community college? Is it shared with the
[1:56:18]
community college? I mean, all those
[1:56:20]
kind of things will have to be part of
[1:56:21]
that discussion when it comes to the
[1:56:24]
school system project. You know,
[1:56:25]
typically those CTE centers, it's a
[1:56:28]
school project and it's a school
[1:56:30]
facility. This is a little different
[1:56:32]
just because of the the makeup of the
[1:56:34]
property and the building, you know, and
[1:56:36]
when we start talking about having
[1:56:38]
spaces for economic development and for
[1:56:40]
businesses, that changes that, you know,
[1:56:43]
changes that structure a little bit and
[1:56:44]
it makes it a little more challenging
[1:56:46]
when you have those different
[1:56:48]
relationships. And so all those things I
[1:56:50]
think we can work through, but those are
[1:56:51]
the the things that we'll have to
[1:56:53]
consider. And that's where these folks
[1:56:54]
are already working on a number of those concepts and and parts
[1:56:59]
of the
[1:57:00]
>> if you and staff could work on that
[1:57:03]
>> um and um I think and then draw a
[1:57:06]
comparative model from what you're going
[1:57:08]
to provide that we already are doing or
[1:57:11]
[clears throat] have scoped out and
[1:57:13]
overlay that with uh Dan's um uh you
[1:57:17]
know his his u chart here and and his
[1:57:20]
vision for this and see where potential
[1:57:23]
gaps are.
[1:57:24]
>> Um, one thing, um, we in government have
[1:57:28]
a really good knack at doing things at a
[1:57:31]
snail's pace
[1:57:33]
>> and, um, I'm feeling a little bit of a
[1:57:36]
sense of urgency um, to get this project
[1:57:39]
moving and um, there are things that
[1:57:42]
could be done now um, that's more on the
[1:57:45]
research oriented side um, you know,
[1:57:49]
without coming to some definite hard
[1:57:51]
conclusions. Um, but we've got to figure
[1:57:53]
out the things that we can start pulling
[1:57:55]
the trigger on while we're making these
[1:57:57]
decisions because, you know, I'm not
[1:58:00]
interested in waiting three or four
[1:58:01]
years, um, you know, for this project to
[1:58:04]
be built. Um, I think we've got to get
[1:58:06]
on it and we've got to be efficient
[1:58:08]
about it and we've got to be very
[1:58:09]
intentional about it. Do you agree with
[1:58:11]
that, Mr. Quinn?
[1:58:12]
>> 100%. Okay.
[1:58:14]
>> 100%. Because I see I see Brandy getting
[1:58:17]
to a point where all of a sudden she
[1:58:19]
needs this.
[1:58:20]
>> Yeah. Exactly.
[1:58:21]
>> Well, who's working on Well, nobody's
[1:58:23]
working on that, so we'll start it
[1:58:24]
today. Well, now it takes three months
[1:58:26]
to do whatever that is.
[1:58:27]
>> And Bry's got a job. She does a lot of
[1:58:29]
other things, right?
[1:58:31]
>> And she's grinning at me. I know she's
[1:58:32]
like going, "Yes, somebody said that."
[1:58:35]
[laughter] But, uh, so Dan, thank you.
[1:58:36]
>> Yeah. So, Steve, in addition to doing
[1:58:38]
Nick articulated that piece really well.
[1:58:41]
Could you come back and tell us the
[1:58:43]
leadership model that you see for this?
[1:58:45]
Like, do you agree it's a project
[1:58:47]
executive or not? You have another
[1:58:48]
alternative. and and that that that if you did agree, what would a job
[1:58:53]
description look like for that person in
[1:58:55]
your ideal world?
[1:58:56]
>> Sure.
[1:58:56]
>> Okay. Thanks.
[1:58:57]
>> All right. Thank you so much, Dan. We
[1:58:59]
appreciate it. Um, any other questions
[1:59:02]
or comments before we move on?
[1:59:04]
>> I think the biggest I I'm probably just
[1:59:06]
repeating myself, but I just want to say
[1:59:07]
it again. The biggest takeaway from this
[1:59:09]
is set deliverables.
[1:59:12]
>> Yes.
[1:59:12]
>> For each section. Yes.
[1:59:14]
>> And what person is responsible for
[1:59:16]
those.
[1:59:17]
>> That's right. I think that's the biggest
[1:59:18]
takeaway from this
[1:59:20]
>> and they make it measurable and we can
[1:59:22]
track progress
[1:59:23]
>> and we want to know how it h how they
[1:59:25]
came to it and who did it.
[1:59:27]
>> Correct. Agreed upon. I think the board
[1:59:30]
um you all are in agreement with that.
[1:59:32]
Mr. Carter.
[1:59:33]
>> Yes.
[1:59:34]
>> Okay. Very good. All right. We're going
[1:59:36]
to move on. Uh the next item on our
[1:59:38]
agenda, Mr. Sandy, did that conclude
[1:59:39]
your remarks first? I may have cut you
[1:59:42]
off.
[1:59:42]
>> No.
[1:59:43]
>> You you Okay. Okay. Uh the next item on
[1:59:46]
our agenda, um we've got Lisa Cooper
[1:59:49]
coming up. Um and we're going to uh I
[1:59:52]
know Mr. Evans is here, the chair of the
[1:59:54]
planning commission. Welcome, uh Mr.
[1:59:56]
Evans to the meeting. Um and we're going
[1:59:58]
to have I believe an overview or an
[2:00:00]
update on the zoning rewrite.
[2:00:03]
>> Yep. Let me I'll I'll maybe frame just
[2:00:06]
some reference. So, the first thing we
[2:00:08]
did want to just touch on is um just I
[2:00:11]
think maybe the shorter conversation is
[2:00:14]
um the planning commission did a 2232
[2:00:17]
review, a comprehensive plan review of a
[2:00:19]
cell tower recently and just under state
[2:00:22]
code and and Mr. Mr. Da can jump in if I
[2:00:24]
misspeak at all, but under state code,
[2:00:26]
the planning commission decision whether
[2:00:28]
it's in conformance with the plan stands
[2:00:31]
and moves forward unless the board uh
[2:00:34]
decides they want to hold their own
[2:00:35]
public hearing and and review the
[2:00:37]
request. And so I think Mr. Dak, I think
[2:00:40]
it's a 30-day that the board kind of has
[2:00:43]
to decide if they want to take it up or
[2:00:45]
not. um you know and so since they just
[2:00:48]
took the action uh what last week Lisa
[2:00:50]
we just wanted to bring it to the board
[2:00:52]
for the board's attention and possible
[2:00:54]
direction on moving forward
[2:00:56]
>> no statuto deadline absent an appeal
[2:00:58]
there's an appeal you have 60 days to
[2:01:00]
make a decision on it with no appeal
[2:01:02]
there's certainly no deadline but you
[2:01:04]
should act if not at this work session
[2:01:06]
at the next public meeting at the latest
[2:01:08]
would I recommend that y'all
[2:01:09]
>> yeah you want to take it [clears throat]
[2:01:11]
up
[2:01:11]
>> and so really the only action would be
[2:01:13]
is if the board wants to do their own
[2:01:15]
public hearing directing staff to
[2:01:17]
schedule [clears throat]
[2:01:18]
a public hearing for that substantial
[2:01:20]
conformance review.
[2:01:21]
>> So, are the materials um Steve that
[2:01:23]
we've seen thus far um is there more
[2:01:26]
material that needs to be reviewed at
[2:01:28]
the board level?
[2:01:29]
>> If if you decided to move forward with
[2:01:30]
public hearing, there is some more
[2:01:32]
materials. We tried to give you enough
[2:01:33]
to give you an idea of of kind of what's
[2:01:36]
being requested. So, um, Lisa can maybe
[2:01:39]
speak a little bit more to the site, but
[2:01:41]
basically, um, it's in the Henry area,
[2:01:43]
the county, Blige District, non-zoned
[2:01:45]
area, uh, company is looking to build a
[2:01:48]
new cellular tower. Um, and because of
[2:01:52]
that, it falls under the comp plan
[2:01:54]
conformance review um, process. And so,
[2:01:57]
Lisa, do you have some slides on this
[2:01:59]
one or just want to speak to a couple of
[2:02:00]
the details of the project?
[2:02:02]
>> It's probably still on here. Maybe if um
[2:02:05]
I can just speak. The planning
[2:02:07]
commission did hold their public hearing
[2:02:08]
on August 11th um for a new tower that
[2:02:13]
um it's uh vertical bridge and Celco
[2:02:18]
partnership with Verizon Wireless. And
[2:02:21]
it's off of Henry Road. It's Cherry
[2:02:24]
Lane. It's a private road. It's about
[2:02:27]
21.259
[2:02:29]
acres. Um it'll be about 100 by 100
[2:02:32]
least area. The tower will be 190 foot
[2:02:36]
in height with 4ft lightning rod. Um
[2:02:39]
it's not high enough to have to have any
[2:02:41]
lighting on the top. Um your planning
[2:02:45]
commission did uh come to the conclusion
[2:02:48]
that it was consistent with your
[2:02:50]
comprehensive plan policies, goals,
[2:02:52]
objectives, and strategies that it would
[2:02:55]
not be detrimental to the adjacent or
[2:02:57]
surrounding area. it was still in
[2:03:00]
character with the future land use of
[2:03:03]
the community and that such use would be
[2:03:05]
in harmony with the purpose and the
[2:03:07]
intent of your comprehensive plan and
[2:03:09]
the community's public health safety and
[2:03:11]
general welfare. I will tell you this
[2:03:13]
lot is very wooded. Uh when the planning
[2:03:16]
commission did the site visit, they
[2:03:19]
basically went on the private road
[2:03:21]
really couldn't go any further because
[2:03:23]
it is it is so wooded. And of course,
[2:03:26]
the company will only cut down the trees
[2:03:28]
that they need to get to the least area,
[2:03:31]
which was shown in your packet on um I
[2:03:34]
think it was number 17. Um I would
[2:03:38]
[clears throat] be glad to answer any
[2:03:40]
questions. I know I was out of the
[2:03:42]
office that day and one of the staff
[2:03:45]
members was trying to get a hold of me
[2:03:47]
with a Verizon cell phone and it
[2:03:50]
wouldn't go through.
[2:03:51]
>> [laughter]
[2:03:51]
>> Um, so we did have um a couple of um one
[2:03:57]
or two people that lived in the area
[2:04:00]
against um they didn't think that they
[2:04:01]
needed a cell tower. Um they really did
[2:04:04]
not want it. They had concerns from the
[2:04:07]
health of it to just being there. Um
[2:04:11]
there was one gentleman that spoke in
[2:04:13]
favor of it. his mother lived close well
[2:04:17]
in this area and all she has is a cell
[2:04:19]
phone and he's concerned when he's at
[2:04:22]
work that if something happens to her
[2:04:24]
she wouldn't be able to get anybody
[2:04:25]
there. So you kind of had both sides um
[2:04:30]
of people talking. So um but the
[2:04:32]
planning commission did um decide a 6
[2:04:36]
vote. There was one uh planning
[2:04:38]
commission member absent.
[2:04:40]
>> Okay. All right. Um, does that conclude
[2:04:43]
your remarks, Lisa?
[2:04:44]
>> Uh, yes, ma'am.
[2:04:45]
>> Okay. So, what I'd like to do, yes, open
[2:04:47]
up the day, Mr. Tatum.
[2:04:49]
>> Okay. I guess my question in in that
[2:04:53]
area, there's a cell phone tower on
[2:04:55]
Brown Hill, which is the the mountain.
[2:04:57]
>> Then you have the tower there at the
[2:04:59]
Henry Fire Department, which is 195 ft
[2:05:02]
tower that currently has nothing on it.
[2:05:06]
>> And then this tower is going to be less
[2:05:08]
than a mile from that tower.
[2:05:11]
Do we need that many towers within such
[2:05:13]
a short span? And could the cell to
[2:05:16]
could the tower there at the Henry Fire
[2:05:17]
Department be utilized instead of
[2:05:19]
building a new tower?
[2:05:20]
>> I I do have a map that was um a couple
[2:05:23]
of maps that were supplied to me by the
[2:05:26]
cell
[2:05:27]
and um basically when I asked them the
[2:05:31]
question of why they were not
[2:05:33]
colllocating on the one at the rescue or
[2:05:36]
at the Henry firehouse was um this is
[2:05:39]
the explanation they gave me. the one
[2:05:41]
that you're talking about that's north
[2:05:43]
of the Henry um tower that is owned by
[2:05:48]
T-Mobile now and Verizon is already on
[2:05:50]
it for them to locate on the tower at
[2:05:56]
the firehouse would not give them the
[2:05:58]
coverage that they needed. So, they
[2:06:01]
wanted a new tower at the location that
[2:06:03]
they're posed that they could get more
[2:06:06]
individuals
[2:06:08]
um because of the two towers of being on
[2:06:10]
the one on Brown, then if they had a
[2:06:13]
tower a distance away from that one,
[2:06:16]
then they could get more coverage. And
[2:06:18]
that was the explanation that I got. And
[2:06:20]
that was the one that that was given at
[2:06:22]
the public hearing
[2:06:23]
>> even though it's just a a mile rough.
[2:06:27]
>> Yes. And I guess that's up to the board
[2:06:30]
of supervisors. If you would like us to
[2:06:32]
dig into it more deeply with the
[2:06:35]
company, if you want to hold a public
[2:06:37]
hearing, then you could do it is your
[2:06:40]
right to do the 15.2232
[2:06:44]
review. You don't have to accept um
[2:06:47]
planning commission's recommendation,
[2:06:50]
but I mean, correct me if I'm wrong. um
[2:06:52]
if this is in conformance with the comp
[2:06:55]
plan um under state law that it should
[2:06:58]
be approved if there's alignment. Would
[2:07:00]
that be a accurate statement?
[2:07:02]
>> Yes. I mean it should be approved but if
[2:07:05]
I will say this even though it staff
[2:07:08]
supported it that was it in compliance
[2:07:10]
and so did the planning commission. If
[2:07:12]
there are concerns of the board of
[2:07:14]
supervisors I don't think it would hurt
[2:07:18]
um if there was some questions that you
[2:07:20]
wanted answered.
[2:07:21]
>> Okay. or I guess we have a little bit of
[2:07:24]
time that we might be able to get
[2:07:26]
answers without you having a public
[2:07:28]
hearing.
[2:07:29]
>> Yeah, I was going to suggest perhaps if
[2:07:31]
there were specific questions, we could
[2:07:32]
have them maybe provide some more
[2:07:34]
information before the board's next
[2:07:35]
meeting and then the board could decide
[2:07:37]
at that point whether to move forward
[2:07:39]
with the public hearing or let it ride.
[2:07:41]
>> So, Mr. Tatum, I want to make sure that
[2:07:43]
um your questions have been
[2:07:45]
>> Yeah, she's she's answering my
[2:07:47]
questions. I'm I'm I'm not sure that I'm
[2:07:50]
satisfied with the answer, but I would
[2:07:51]
like more information if you could get
[2:07:53]
it,
[2:07:54]
>> Mr. Carter.
[2:07:55]
>> Yeah. Thank you, Lisa. I was at the
[2:07:57]
planning hearing and there was some
[2:07:59]
discussion about [clears throat] an
[2:08:01]
emergency module on the tower and I
[2:08:04]
didn't exactly understand what all they
[2:08:06]
were talking about. Uh the new tower,
[2:08:09]
they've got spaces for, I don't know,
[2:08:11]
three or four modules and then if
[2:08:13]
there's room, they'll let us put an
[2:08:15]
emergency thing. But it was sort of like
[2:08:18]
they didn't guarantee that. It was like
[2:08:21]
if there was space, they would. And and
[2:08:23]
for me personally, since we don't have
[2:08:25]
that on the Henry Tower,
[2:08:29]
I would like for them to agree to give
[2:08:31]
us space for an emergency whatever it
[2:08:34]
is. Well, we what they what we usually
[2:08:37]
or what we have done in the past is we
[2:08:39]
have always asked to have space on any
[2:08:41]
tower for emergency services and they
[2:08:46]
hadn't planned for that. They had just
[2:08:50]
planned for other sale companies to be
[2:08:52]
on there. So, what we did after the
[2:08:55]
meeting is I got with Mr. Sandy and fire
[2:08:59]
and em EMS to see if they wanted to
[2:09:02]
colllocate on this tower and they didn't
[2:09:05]
feel that there was any need for them to
[2:09:08]
colllocate on it. So that issue
[2:09:11]
I won't say has died but it it doesn't
[2:09:15]
seem like the public safety wants to be
[2:09:17]
on the tower that we're talking about
[2:09:19]
today.
[2:09:20]
>> So they don't need it.
[2:09:21]
>> Well, I can I can expand. They're on the
[2:09:22]
ground tower already. So okay,
[2:09:25]
>> which is the one Mr. Tatum was referring
[2:09:27]
to. So it's it's too close to need
[2:09:30]
another tower basically.
[2:09:31]
>> I I didn't understand that exactly, but
[2:09:33]
I didn't want to build a new tower and
[2:09:35]
then us not having an emergency.
[2:09:37]
>> Yeah. So we're comfortable that the fact
[2:09:39]
that we have space on that tower and
[2:09:40]
then as Mr. Tatum mentioned if for some
[2:09:43]
reason that other tower went away, there
[2:09:45]
is the tower at Henry that I think would be our kind of our fallback option
[2:09:50]
if we if we needed a location in the
[2:09:52]
Henry area. But right now we have those
[2:09:54]
facilities on the Brown Hill Tower and
[2:09:56]
we're satisfied with those.
[2:09:58]
>> So any other questions? Mr. Mr.
[2:10:00]
>> Y'all say this is Verizon want to do
[2:10:02]
this one?
[2:10:03]
>> Um it is Verizon I guess will be the top
[2:10:06]
one and it the company that would be um
[2:10:09]
building it is my understanding would be
[2:10:11]
that vertical bridge and um Celco
[2:10:15]
uh partnership. So this is a
[2:10:19]
tower builder, tower speculator, and and
[2:10:22]
they're so [clears throat] they would be
[2:10:23]
the ones building the tower. I think Mr.
[2:10:25]
Quinn maybe even mentioned it at the
[2:10:26]
last meeting that Verizon is kind of
[2:10:28]
getting away from building their own
[2:10:29]
towers. So this group would build the
[2:10:31]
tower for Verizon u in this location.
[2:10:35]
>> Is this group comprised of any
[2:10:36]
individuals we worked with in the past?
[2:10:40]
>> I don't I didn't re the two gentlemen
[2:10:42]
that I worked with and staff worked
[2:10:44]
with. I had never seen them before.
[2:10:46]
>> Verizon's been supposed to come to Snow
[2:10:48]
Creek for the last three August.
[2:10:51]
So, I'm glad they're coming here.
[2:10:54]
[laughter]
[2:10:54]
>> You know what I mean? I do.
[2:10:55]
>> I I don't have a problem with this at
[2:10:57]
all.
[2:10:57]
>> If it if it's going to expand service,
[2:10:59]
people in Snow Creek would love to have
[2:11:01]
>> Yes, I understand
[2:11:01]
>> this coming to them. And I'm not
[2:11:03]
dabbling in a 2232 conformance review.
[2:11:06]
I've done learned my lesson on it. Last
[2:11:08]
time I fussed that the planning
[2:11:09]
commission didn't take the action they
[2:11:10]
were supposed to, they did it this time.
[2:11:12]
and I have no interest in a public
[2:11:14]
hearing on this.
[2:11:15]
>> Okay. Um before I solicit um for you
[2:11:19]
know that level of feedback, Mr.
[2:11:21]
Jameson, did you have something?
[2:11:23]
>> Verizon Eric Callaway about I don't know
[2:11:26]
six months ago we we went to with
[2:11:28]
Verizon. Great about two months. It
[2:11:31]
ain't worth the crap now. We got no
[2:11:33]
coverage at all. Drop loans. You you
[2:11:37]
call in call me. We'll be sitting there
[2:11:39]
talking and all it just got away.
[2:11:42]
And I don't know that this is going to
[2:11:44]
give us any coverage and all in Callaway
[2:11:46]
area, but uh like I said, we it's very
[2:11:49]
disappointing with Verizon in that area
[2:11:52]
now. And everybody's having the same
[2:11:53]
problem in that area.
[2:11:54]
>> We had a tough time having a
[2:11:56]
conversation what was it yesterday or
[2:11:57]
day before yesterday?
[2:11:58]
>> Yes, ma'am. It dropped twice, three
[2:12:00]
times.
[2:12:01]
>> Yeah. Yeah.
[2:12:01]
>> You know, within probably two
[2:12:02]
[clears throat] minutes.
[2:12:03]
>> Yeah. So, um are there any other
[2:12:06]
comments on this before we get to the
[2:12:09]
question? Okay. So the question before
[2:12:12]
us um today unless Steve Lisa if you
[2:12:14]
have any uh closing remarks on this
[2:12:17]
matter before we kind of give an opinion
[2:12:19]
on whether we want to engage in a public
[2:12:21]
hearing.
[2:12:22]
>> Um I I do not just if if you decide if
[2:12:26]
you don't want to decide today if you
[2:12:28]
want a public hearing but you want
[2:12:30]
additional information just right I I
[2:12:32]
would like it to be somewhat specific so
[2:12:34]
that I could go back to the company.
[2:12:36]
>> That's fair. Okay. So, what is uh your
[2:12:39]
desire? Um, let's just kind of poll. Mr.
[2:12:42]
Jameson, would you like to get
[2:12:45]
additional information or do you want a
[2:12:47]
public hearing or I don't think it's
[2:12:49]
going to affect us there any more than
[2:12:50]
it is now right now. But, uh, you don't
[2:12:53]
think I'd ask that we get it in Callaway
[2:12:55]
and build one in Callaway further to do
[2:12:56]
in Snow Creek. [laughter]
[2:12:59]
>> So, you got to answer my question still.
[2:13:02]
>> I'm I'm Go ahead and do it. Then he's
[2:13:04]
there. Good.
[2:13:05]
>> So, you're
[2:13:06]
>> I'm pulling.
[2:13:07]
>> All right. So, you don't want the board
[2:13:09]
to conduct a public hearing?
[2:13:11]
>> No.
[2:13:11]
>> And Okay.
[2:13:12]
>> Good with that.
[2:13:12]
>> And so, you're willing I just want to
[2:13:14]
reaffirm that the planning commission's
[2:13:16]
recommendation stands good with you.
[2:13:18]
>> Yes, ma'am.
[2:13:19]
>> Okay. Mr. Tatum,
[2:13:21]
>> I'm not going to hold it up. There are
[2:13:22]
people in that area in the the lower
[2:13:25]
part of this map that will benefit from
[2:13:29]
this tower. And those people have been
[2:13:32]
living there for my whole life. and they
[2:13:35]
probably have never had cell phone
[2:13:36]
service in their life. I'm not going to
[2:13:38]
hold up the project. Let it let it move
[2:13:40]
forward.
[2:13:40]
>> Well, Mr. Tatum, what I would um suggest
[2:13:44]
um is we'll see where we are, but
[2:13:46]
there's nothing to keep you from, you
[2:13:48]
know, giving Mr. Sandy some questions
[2:13:50]
and Lisa um some inquiries just to get
[2:13:53]
your questions answered.
[2:13:54]
>> Yeah. And and I I will do that. I would
[2:13:57]
like to find out, you know, what is the
[2:14:00]
status of of the tower at the Henry Fire
[2:14:02]
Department since Scient I don't think is
[2:14:05]
no longer in existence and they were the
[2:14:07]
only ones on that tower.
[2:14:09]
>> Um,
[2:14:11]
>> you know, right now I've got a 195 ft
[2:14:14]
tower sitting in right there in the
[2:14:16]
parking lot at the Henry Fire
[2:14:17]
Department,
[2:14:17]
>> right?
[2:14:18]
>> And it's not serving a purpose other
[2:14:21]
than eyesore.
[2:14:23]
>> Mr. Carter,
[2:14:24]
>> I'm good with moving forward
[2:14:25]
>> with no public hearing.
[2:14:27]
>> Yes, ma'am.
[2:14:27]
>> Mr. Mitchell,
[2:14:28]
>> good.
[2:14:29]
>> Mr. Quinn,
[2:14:30]
>> agree.
[2:14:30]
>> And I am in agreement as well. Um so the
[2:14:33]
conclusion is that the board um supports
[2:14:38]
um the planning commission's rendering
[2:14:41]
and it is our desire to not have a
[2:14:43]
public hearing at our level and we are
[2:14:46]
going to leave it that if individual
[2:14:48]
supervisors you know have additional
[2:14:50]
questions Lisa um hopefully u between
[2:14:53]
you and and Steve that they can get
[2:14:55]
their questions answered in the interim.
[2:14:58]
Does that give you what you need?
[2:15:00]
>> I think it does. Are you sure?
[2:15:02]
>> I think so. I just want to make sure. Do
[2:15:04]
you want me to dive in why they're
[2:15:06]
building a new tower or not?
[2:15:11]
» I would appreciate an answer.
[2:15:13]
>> Okay.
[2:15:14]
>> I mean, it doesn't have to be anything
[2:15:15]
formal. Just
[2:15:16]
>> Do you want to Do you want to hold up
[2:15:18]
this cons?
[2:15:20]
>> No, don't hold it up.
[2:15:21]
>> Are you sure?
[2:15:21]
>> Yeah. Move M move forward. But I would
[2:15:23]
like to know why why it's more feasible
[2:15:27]
for them to build a new tower than it is
[2:15:28]
to go on an existing one that's within a
[2:15:30]
mile of where they're going to build.
[2:15:32]
>> I think that's a reasonable question.
[2:15:34]
>> Okay. Well,
[2:15:35]
>> I'm not answering for them and Victor,
[2:15:37]
he may remember, but there was something
[2:15:39]
about the elevations. It is why that
[2:15:45]
>> Mr. Evans, if you'd like to comment,
[2:15:47]
you're more than welcome to.
[2:15:48]
>> Something that I didn't say that would
[2:15:50]
be great.
[2:15:52]
Madame Chair and County Supervisors, um
[2:15:55]
that was a concern. The topography of
[2:15:57]
the area is a problem and to truly get
[2:16:00]
the coverage as Mr. Cooper had
[2:16:02]
mentioned, you have to have it a little
[2:16:04]
bit farther out than the proximity to
[2:16:08]
Brown Hill tower is too close to make it
[2:16:11]
worthwhile. So having it further out,
[2:16:13]
then you get the extension because they
[2:16:15]
only go about so many miles with line of
[2:16:16]
sight. So topography was the big issue
[2:16:19]
as to why it wasn't effective to use the
[2:16:22]
one at the station.
[2:16:23]
>> Okay, that answers my question.
[2:16:25]
>> Thank you very much. Okay, so Lisa, are
[2:16:28]
you clear or do if you have any
[2:16:29]
questions for us or need clarification?
[2:16:31]
Um they have actually the company has um
[2:16:35]
asked me today if I had heard anything
[2:16:37]
because they're they're waiting and so I
[2:16:40]
can send them an email asking for some
[2:16:42]
more information that maybe we can put
[2:16:44]
in a Friday packet
[2:16:47]
>> or something like that.
[2:16:48]
>> Okay. So you're next up with um Mr.
[2:16:51]
Sandy maybe opening remarks on the
[2:16:53]
zoning ordinance review.
[2:16:54]
>> Yes. Yeah. I'll I'll open with a few
[2:16:56]
comments and you kind of already met Mr.
[2:16:59]
Um, Mr. Chair of the Planning
[2:17:02]
Commission, uh, Victor Evans. And so, we wanted to have an opportunity to to
[2:17:06]
provide an update. So, just quick
[2:17:09]
historical recap. Of course, uh, in this
[2:17:11]
room, I believe it was May 17th, we had
[2:17:14]
a joint work session with the planning
[2:17:16]
commission to really look at the first
[2:17:18]
draft of the zoning ordinance. Um, that
[2:17:21]
was prepared by our consultant, the
[2:17:23]
Berkeley Group. Uh at that time the the
[2:17:25]
planning commission had requested that
[2:17:28]
they be allowed to basically take that
[2:17:30]
draft back and work on it um some more.
[2:17:32]
They weren't comfortable with where it
[2:17:34]
was in that current um draft form. And
[2:17:37]
the board's direction was to them was
[2:17:40]
yes, go ahead and do that. Take as much
[2:17:42]
time as you need. Um you know, when
[2:17:45]
you're ready, bring it back. And so
[2:17:46]
since that time, the planning commission
[2:17:48]
has uh been working through what that
[2:17:50]
process would look like and how they
[2:17:52]
would kind of attack that um that
[2:17:55]
revisiting the the document, so to
[2:17:57]
speak. I think in the meantime, they had
[2:17:59]
uh two members come off and had two new
[2:18:01]
members come on and so it's been two or
[2:18:04]
three months that they've kind of talked
[2:18:05]
through this and worked through a
[2:18:07]
possible schedule for uh reviewing and updating the ordinance. And so
[2:18:12]
thought it was a a good opportunity and
[2:18:14]
they were at a good point um that they
[2:18:16]
had come up with some ideas for them to
[2:18:18]
come and present um kind of what they've
[2:18:22]
discussed and and kind of where they are
[2:18:23]
at the moment. Um I think the plan I
[2:18:26]
think the intention is that that plan
[2:18:28]
can be flexible as they move through it.
[2:18:30]
But they wanted to set up a template to follow for uh updating the plan or uh
[2:18:35]
updating the ordinance. Um, I think one
[2:18:38]
of a probably after uh Victor presents,
[2:18:42]
I think one of the key things that he
[2:18:44]
and I both would would really love to
[2:18:45]
see some interaction from the board is
[2:18:47]
what does the update process look like
[2:18:51]
with the board? What is the level of
[2:18:53]
engagement the board would like to have?
[2:18:55]
Does that look like regular updates from the chair in a in a um in a work
[2:19:01]
session like this? Is it joint work
[2:19:02]
sessions on a quarterly basis between
[2:19:05]
the planning commission and board? What
[2:19:07]
is the expectation and what is the level
[2:19:09]
of kind of interaction um that the board
[2:19:12]
would like to have along the way during
[2:19:13]
this process? I know there was concerns
[2:19:17]
mentioned previously about not being
[2:19:20]
updated during the two years that we
[2:19:21]
worked on the the with the consultant.
[2:19:24]
And so we definitely want to make sure
[2:19:26]
that you guys feel like you're you're part of the effort. you're
[2:19:29]
understanding where it is in the process
[2:19:31]
if that's where you want to be. And so I
[2:19:33]
think some that's some direction that I
[2:19:35]
think Victor um is is here today to kind
[2:19:38]
of seeking how that would fit into the
[2:19:40]
schedule and maybe how that would modify
[2:19:42]
or adjust the schedule depending on what
[2:19:44]
that looks like. So with that, I'm happy
[2:19:48]
to turn it over to to Victor to kind of
[2:19:50]
outline what their discussions have
[2:19:52]
been. and um there's kind of a schedule
[2:19:55]
that had been floated around of of some
[2:19:58]
things that he had worked through with the planning commission. So,
[2:20:01]
unfortunately, Mr. Jefferson, I think,
[2:20:03]
is out of town, the vice chair, uh I
[2:20:05]
think he probably would have come with
[2:20:07]
you and um and and helped you with the
[2:20:09]
presentation, but thank you for coming.
[2:20:11]
We appreciate you being here today.
[2:20:13]
>> Thank you so much.
[2:20:15]
>> The floor is yours, sir.
[2:20:16]
>> Okay.
[2:20:18]
Thank you, Madam Chair and county
[2:20:19]
supervisors. I am the new chair for the
[2:20:22]
planning commission. So, I'm now on my
[2:20:23]
second month. But since there was a a
[2:20:27]
joint decision that what was being
[2:20:29]
proposed for a zoning ordinance didn't
[2:20:32]
really meet the the quality or the
[2:20:36]
standards of of what we wanted to be as
[2:20:38]
a zoning ordinance. And um we took on
[2:20:42]
that task as you requested for us to
[2:20:44]
complete a review of the proposed zoning
[2:20:45]
ordinance. What you have before you is
[2:20:49]
uh what we've determined is our current
[2:20:51]
work schedule [laughter] and calendar of
[2:20:54]
um we started on the end of June where
[2:20:57]
we were trying to develop both action
[2:21:00]
plan and then what that schedule should
[2:21:02]
be so that um and then to present this
[2:21:06]
to you so you're aware of how we want to
[2:21:08]
go about doing what you asked us to do.
[2:21:11]
The way to read that is we do have
[2:21:14]
things in in something of a sequential
[2:21:16]
order from articles one through article
[2:21:18]
9 in that we want to make sure as we're
[2:21:20]
tackling this and I'll tell you a little
[2:21:22]
bit about how that's going. As we're
[2:21:24]
tackling the review, we're creating
[2:21:26]
we're ensuring we understand what solid
[2:21:28]
foundation needs to exist and use those
[2:21:31]
as building blocks as we go through the
[2:21:32]
rest of the articles to see that the
[2:21:35]
fundamentals
[2:21:37]
are we adhere to the fundamentals
[2:21:39]
throughout the whole zoning ordinance.
[2:21:42]
What will happen is with every section
[2:21:45]
that we're going to look at, staff will
[2:21:47]
be presenting to us pointing out three
[2:21:49]
things. First of all, we want to know
[2:21:52]
what it is that staff who has to work
[2:21:54]
with the zoning ordinance on a routine
[2:21:56]
basis to see to it that they have
[2:21:58]
consistent guidance and decision- making
[2:22:00]
with the citizens.
[2:22:02]
Why is it what is it that you really
[2:22:05]
wanted in a zoning ordinance? We want to
[2:22:07]
know what is it that staff wanted.
[2:22:09]
Second thing, what is it that has to be
[2:22:12]
in a zoning ordinance to be in
[2:22:13]
compliance with code of Virginia? The
[2:22:15]
third thing is what is it that was
[2:22:17]
carried over from the existing zoning
[2:22:20]
ordinance so that we know this is not
[2:22:22]
new. This is what we've been working
[2:22:24]
with.
[2:22:26]
That leads us to the fourth item or
[2:22:28]
component of the zoning ordinance and
[2:22:30]
that is
[2:22:32]
what was proposed as best practices.
[2:22:34]
Whether they're really good practice
[2:22:36]
worthy of being in Franklin County, we
[2:22:37]
don't know yet. But so we'll know what
[2:22:39]
it is that staff really wanted, what's
[2:22:41]
required by code of Virginia, what's
[2:22:43]
carried over from the current zone uh
[2:22:45]
zoning ordinance, and then what are best
[2:22:47]
practice suggestions.
[2:22:49]
In each one of those occasions, the
[2:22:51]
planning commission will make decision
[2:22:54]
as to whether we like what's being
[2:22:55]
presented as written, whether it needs
[2:22:58]
to be rewarded to be more appropriate or
[2:23:01]
whether should be deleted,
[2:23:03]
whether it's a best practice or a
[2:23:05]
carryover or whatever. We're going to
[2:23:07]
take a look at that. Obviously, if it's
[2:23:09]
required by code of Virginia, we have no
[2:23:10]
say, but we want to make sure that
[2:23:12]
everybody understands those three
[2:23:14]
components
[2:23:16]
and the fourth being best practices to
[2:23:17]
whether we're going to add that.
[2:23:20]
The way it's laid out is we decided to
[2:23:23]
add two Wednesdays to our one monthly
[2:23:27]
meeting. So, there'll be potential for
[2:23:29]
total of three meetings a month as we go
[2:23:32]
about conducting our work sessions. the
[2:23:35]
code there SV
[2:23:37]
that's the day that we typically have
[2:23:39]
site visits our monthly site visit day
[2:23:41]
followed by now we will do these work
[2:23:44]
sessions in the boardroom because of
[2:23:46]
this live streaming so that'll enable
[2:23:50]
our residents to be able to stay
[2:23:52]
involved whether they come here
[2:23:53]
physically or because of live streaming
[2:23:55]
so it's Wednesdays here site visit day
[2:24:00]
and we expect our work sessions to be
[2:24:02]
about three
[2:24:05]
the P/H question mark. Well, that's our
[2:24:08]
monthly public hearing meeting. Now,
[2:24:11]
there have been times where we only have
[2:24:13]
to have a public hearing for one, maybe
[2:24:15]
two applications, which leaves plenty of
[2:24:18]
time that evening for us to also squeeze
[2:24:20]
in another work session. At this point
[2:24:22]
in time, it's hard to tell which one of
[2:24:24]
our public hearings throughout the year
[2:24:26]
are going to be light or heavy. So,
[2:24:28]
that's why it's the question mark there.
[2:24:30]
So when it's possible, we'll squeeze in
[2:24:32]
more. And then the fourth Wednesday of
[2:24:34]
every month is that's that X you see
[2:24:38]
U will be a dedicated to work sessions.
[2:24:41]
When we went through the trying to come
[2:24:44]
up with the schedule, we anticipated how
[2:24:47]
many work sessions would be appropriate
[2:24:49]
given the subject matter. [snorts]
[2:24:52]
[clears throat] Built into that is we
[2:24:54]
added the our public hearing days. So
[2:24:57]
there's a little flexibility in thinking
[2:24:59]
that somehow or another this schedule
[2:25:01]
could hold up knowing full well that no
[2:25:04]
schedule last scheduling for more than a
[2:25:06]
month or two is going to hold up. So
[2:25:09]
this room has been reserved to the end
[2:25:10]
of October 2027. However, if this
[2:25:14]
schedule does hold up, we think we'll
[2:25:16]
have a we completed all the work
[2:25:18]
sessions necessary to be able to conduct
[2:25:20]
our own public hearing
[2:25:23]
to determine whether it's worthy of
[2:25:26]
adoption by the board of supervisors.
[2:25:28]
So, thinking that could be done in
[2:25:29]
August or September of 2027, we would
[2:25:32]
have a complete zoning ordinance ready
[2:25:35]
for your
[2:25:37]
proposed by us as saying it's no, it's
[2:25:39]
adoption worthy for you.
[2:25:42]
um
[2:25:44]
not included in this work session in
[2:25:46]
this calendar
[2:25:48]
is the frequency of which you would like
[2:25:52]
to be updated. Now when we talked back
[2:25:54]
in May at our joint meeting the idea of
[2:25:57]
having joint meetings to stay a breast
[2:26:00]
of each other's desires and and progress
[2:26:04]
so uh or whether it needs to be a
[2:26:06]
presentation like this. So two things,
[2:26:09]
one you see the calendar before you
[2:26:13]
and
[2:26:15]
[clears throat] and the other one is
[2:26:17]
how would you like to re be updated
[2:26:20]
joint meetings which have to be
[2:26:22]
scheduled. Our recommendation is we're
[2:26:24]
going to do joint meetings is every four
[2:26:26]
months. We think that's enough time for
[2:26:27]
us to make some real substantive
[2:26:29]
progress to have something worthwhile to
[2:26:31]
come and present at a joint meeting. But
[2:26:34]
if you want them more frequently or
[2:26:35]
quarterly or
[2:26:37]
six months, whatever. So that's my
[2:26:39]
question now.
[2:26:40]
>> Okay. Thank Thank you, Mr. Evans. You
[2:26:43]
want me just to pause here and
[2:26:44]
>> and then I'm going to mention something
[2:26:45]
else, but yes, I'm going to pause.
[2:26:47]
>> Do you want to continue before we
[2:26:48]
>> No, I'd like to know what Okay. The
[2:26:50]
desire.
[2:26:52]
Fair enough. So I think what I hear you
[2:26:54]
saying, uh, Mr. Evans, is that you're
[2:26:56]
recommending quarterly
[2:26:57]
>> four months.
[2:26:58]
>> Every four months. Okay. All right.
[2:27:02]
So, what I would like to do
[2:27:04]
is poll supervisors as to what um
[2:27:08]
obviously this is new stuff for us, but
[2:27:10]
do you have any initial reactions to
[2:27:13]
this, Mr. Jameson?
[2:27:15]
>> I have no problem with four months, you
[2:27:17]
know.
[2:27:17]
>> Okay.
[2:27:19]
>> That's what works for the board there.
[2:27:21]
>> And would that be a joint session of the
[2:27:23]
two bodies?
[2:27:25]
>> I don't really know. I don't think so. I think to the board itself would be
[2:27:29]
sufficient to me to our board. Just let
[2:27:32]
him come and present for an update.
[2:27:34]
>> Yeah, we'll see what everybody says. But
[2:27:35]
what I'm I'm just kind of looking at
[2:27:37]
body language. I'm kind of thinking that
[2:27:40]
um these every four month updates could
[2:27:42]
be um you and uh and or andor Ron uh
[2:27:48]
coming and having um an overview
[2:27:51]
presentation uh to the board. Um we'll just stop there for the moment.
[2:27:56]
Tim,
[2:27:57]
>> I'm good with every four months. And I
[2:27:59]
like the idea of either he coming in or
[2:28:02]
Ron or Bo both come in and just present
[2:28:05]
and that way it doesn't tie up all the
[2:28:08]
commissioners on the planning commission
[2:28:09]
so often.
[2:28:12]
>> Mr. Carter.
[2:28:13]
>> Yeah. Yeah. I'm fine with every four
[2:28:14]
months, but I think if it would be
[2:28:16]
possible
[2:28:18]
uh if you all could email us the updates
[2:28:21]
like when you go through articles one
[2:28:23]
through three and that's complete. if
[2:28:26]
you all could email that to us so we
[2:28:28]
could see it and you wouldn't
[2:28:30]
necessarily have to update it, but I'd
[2:28:32]
like to see what's been done. And uh I
[2:28:36]
don't disagree with your four parts you
[2:28:38]
started off with, but you need a fifth
[2:28:40]
part what the citizens want because we
[2:28:43]
got a lot of feedback from the citizens
[2:28:46]
and I want to make sure that you all get
[2:28:50]
that in this rework.
[2:28:53]
>> That's all I have.
[2:28:54]
>> Thank you, Mr. Carter. Mr. Mitchell,
[2:28:56]
>> I'm fine with that him coming every four
[2:28:58]
months. I've had some pretty
[2:28:59]
constructive conversations with my
[2:29:01]
>> Yes.
[2:29:01]
>> planning commissioner already. We've had
[2:29:03]
some good talks about [clears throat]
[2:29:05]
>> how we saw things going forward. Um,
[2:29:09]
I agree with uh Mike there about the um
[2:29:12]
about the citizen input, but I also I
[2:29:15]
asked that the planning commission be
[2:29:16]
very wary about not letting
[2:29:19]
a few people drag them around to decide
[2:29:22]
what the future of of this ordinance
[2:29:26]
looks like for the county to be mindful
[2:29:28]
of the county as a whole
[2:29:30]
>> and not a small piece of it.
[2:29:33]
>> Very good. Thank you, Mr. Quinn.
[2:29:36]
I think the four months works as a
[2:29:39]
>> I think the four months works as a
[2:29:41]
placeholder. One thought is I start
[2:29:43]
thinking about the updates that you'll
[2:29:46]
have and you might find wow there's a
[2:29:47]
lot of stuff here and maybe we should do
[2:29:50]
it earlier because there's so much stuff
[2:29:52]
to work and so yes we we have it
[2:29:54]
scheduled for four months but you
[2:29:55]
suddenly realize three months is is more
[2:29:57]
appropriate. And and then the other
[2:29:59]
comment I I'm thinking about is how you
[2:30:02]
prep us because I think about, you know,
[2:30:04]
when the consultant uh wanted feedback,
[2:30:06]
she handed us a 300page book and said,
[2:30:08]
"Do you have any questions?" Right. And and that didn't work at all. You
[2:30:12]
know, I think you've talked about u I
[2:30:15]
always come back to discretionary
[2:30:18]
changes and non-discretionary. And so
[2:30:20]
the non-discretionary are state mandates
[2:30:23]
that you have to do or you found
[2:30:24]
mistakes that have to be cleaned up.
[2:30:26]
those were um non-discretionary,
[2:30:29]
but but we encountered a lot of changes
[2:30:31]
that were discretionary like the bees
[2:30:33]
and chickens and and subdividing the
[2:30:35]
farmland. And I'm sure there are a lot
[2:30:36]
more and those those are going to
[2:30:38]
require a lot of discussions. And in
[2:30:40]
fact, I think it'll be helpful as you
[2:30:42]
look out for for you to bring stuff to us like that and almost ask us for a
[2:30:47]
vote because I so many of them were
[2:30:50]
they're not black and white. They're not
[2:30:52]
right or wrong. I think there'll be
[2:30:53]
different opinions on them. So, so
[2:30:56]
anyway, that's more than you wanted, but
[2:30:57]
yes. And I think that one just one last
[2:31:01]
change. I I do understand why you're
[2:31:03]
using uh the the current draft as
[2:31:07]
opposed to going back to our old draft.
[2:31:09]
That makes a lot of sense to me.
[2:31:10]
However, it's now going to be more
[2:31:13]
difficult and more uh for you to tell us
[2:31:15]
what changed, right? Because you don't
[2:31:17]
have that red line version to go from
[2:31:19]
what it was to what it is. You only have
[2:31:21]
what it is. And so it's going to be a
[2:31:23]
little trickier for you to identify what
[2:31:25]
changed and and what what are material
[2:31:28]
changes that we really need to focus on.
[2:31:32]
>> Yeah. Thank you, Mr. Quinn. Uh if I may,
[2:31:35]
um uh Mr. Evans, I I think my colleagues
[2:31:38]
are hitting on some really good points.
[2:31:40]
Um, I really do uh I like the um every
[2:31:45]
uh four months and um I definitely think
[2:31:50]
that uh incremental updates um by
[2:31:53]
section would be most helpful. Um so but
[2:31:56]
it's a lot for us to just get um you
[2:32:00]
know the next draft and and just be
[2:32:03]
charged with you know sitting and
[2:32:05]
reviewing you know copious pages of of this and we'll be able to you know
[2:32:10]
give more direct attention to it in that
[2:32:12]
way. Um I could envision depending upon
[2:32:16]
the planning commission's progress um we
[2:32:20]
might want to have
[2:32:22]
I don't know I'm thinking off the cuff
[2:32:24]
here. we might want to have a joint
[2:32:25]
meeting with the planning commission um
[2:32:27]
prior to
[2:32:29]
um the planning commission's um
[2:32:33]
presentation and recommendation to the
[2:32:35]
board of supervisors. U but you all
[2:32:37]
that's not anything that I'm saying go
[2:32:39]
do. Um I'm just thinking out loud a
[2:32:41]
little bit. Um is there my question to
[2:32:43]
myself is is there a time where we might
[2:32:46]
want to engage both bodies around the
[2:32:48]
table uh just to cover thoughts
[2:32:50]
questions and at that point we would
[2:32:53]
have the benefit of the full draft. Does
[2:32:55]
that make sense?
[2:32:57]
I um I would recommend that there at
[2:33:00]
least be one or two joint sessions
[2:33:02]
because in that kind of a meeting
[2:33:05]
there's a open discussion and a better
[2:33:07]
clear understanding of us and the entire
[2:33:11]
board
[2:33:12]
>> as to when that should be done. I guess
[2:33:15]
as we pro proceed it'll become more
[2:33:18]
obvious as to when's a good point to
[2:33:21]
request that.
[2:33:22]
>> Sure. And we can this is a fluid process
[2:33:24]
obviously as you were saying with the
[2:33:26]
work sessions and all you know golly if
[2:33:28]
we could get done before next fall that
[2:33:30]
would be fantastic but nobody wants to
[2:33:32]
meet five times a month either um you
[2:33:35]
know and your hour your meetings are
[2:33:36]
three hours long is what you're
[2:33:38]
projecting anyway um I would and I don't
[2:33:41]
know what your preparation is going to
[2:33:43]
be with regard to illustrating um
[2:33:45]
changes over the current draft because
[2:33:48]
we're not working on well you tell me um
[2:33:51]
the changes are You are you guys looking
[2:33:53]
at the changes over the current
[2:33:54]
ordinance or the draft?
[2:33:58]
>> Mostly we're going to use the format of
[2:34:00]
what has been proposed,
[2:34:02]
>> but content,
[2:34:03]
>> but the content of what's in chapter 25
[2:34:06]
of your current zoning ordinance. Um, I
[2:34:10]
also like to point out we're not going
[2:34:11]
to lose track of that, but we're also
[2:34:15]
[clears throat]
[2:34:16]
in our work sessions, we came up with a
[2:34:18]
four-page action plan to account for the
[2:34:22]
fact that there we've received a massive
[2:34:25]
amount of input from our residents.
[2:34:29]
And we're going [clears throat] to divvy
[2:34:30]
those all those questions and concerns
[2:34:31]
and comments up amongst all of us to see
[2:34:34]
to it for all the time the citizens put
[2:34:36]
into giving us feedback. Did we in fact
[2:34:40]
look at it, address it? And so as we're
[2:34:43]
going through the entire zoning
[2:34:44]
ordinance, we're making sure what it is
[2:34:47]
that came up in in just I mean truly
[2:34:50]
it's a lot of comments that were were
[2:34:52]
they addressed and if they weren't,
[2:34:54]
we'll know which still needs to be
[2:34:55]
addressed. So we're going to take care
[2:34:57]
of that. Also the matter of citizen
[2:35:00]
participation
[2:35:02]
um we [clears throat] have said for our
[2:35:05]
work sessions we have two signup sheets
[2:35:08]
based on the topic. People selfidentify
[2:35:10]
as subject matter experts. They get to
[2:35:12]
speak first and then we'll open it up to
[2:35:15]
the comments from the uh residents. So
[2:35:19]
this like a general uh public comment
[2:35:21]
period
[2:35:23]
because we re realize that without their
[2:35:26]
the citizens support and their genuine
[2:35:29]
concern now to move forward without
[2:35:31]
their ability to feel comfortable with
[2:35:33]
it would would just be
[2:35:34]
counterproductive.
[2:35:35]
>> Well to Mr. Mitchell's point um I want
[2:35:38]
to make sure that there is very very
[2:35:41]
good fluid communication across the
[2:35:43]
entire county.
[2:35:44]
>> Yes.
[2:35:45]
um you know making sure our residents
[2:35:47]
know from every facet of our county
[2:35:50]
footprint what's going on what the dates
[2:35:52]
are uh maybe if there is any way to put
[2:35:56]
you know some marginal updates on on the
[2:35:59]
website I don't know what your
[2:36:00]
mechanisms in place are but I want to
[2:36:03]
make sure that we have opportunities to
[2:36:05]
hear from each and every citizen across
[2:36:08]
the county should they wish to do so
[2:36:10]
>> Mrs. Cooper and the planning department
[2:36:12]
has come up with a new system by which
[2:36:13]
to alert the the community.
[2:36:15]
>> Yes. Yes. Yes.
[2:36:16]
>> Um and they will be seeing this schedule
[2:36:18]
now that you've seen it and you agree
[2:36:20]
with it.
[2:36:21]
>> Now, Victor, I will interrupt you to say
[2:36:23]
that that if you're working on the
[2:36:25]
emergency alert system or I'm not even
[2:36:27]
sure I'm characterizing it. That's for
[2:36:29]
people that sign up. If you're not
[2:36:32]
signed up, you're not reached, right?
[2:36:34]
>> Um yes, ma'am. It is for people that has
[2:36:36]
signed up.
[2:36:37]
>> So, we're still going to miss people.
[2:36:39]
There'll be two methods. I mean, we do
[2:36:41]
have a lot of public participation that
[2:36:43]
they're aware of what we're doing and
[2:36:45]
they're also assisting us with getting
[2:36:47]
the word out so that they know that on
[2:36:49]
the county website, this schedule will
[2:36:51]
be posted with the topic issues. And
[2:36:54]
we're working on making sure that in
[2:36:56]
preparation for each of these work
[2:36:58]
sessions, the uh company documents are
[2:37:01]
well identified so people can review
[2:37:03]
them too prior to the work sessions.
[2:37:04]
>> Yeah. I just don't want to take for
[2:37:05]
granted that that system is adequate.
[2:37:10]
Um, you know, that was one of the big
[2:37:12]
problems we had, lessons learned. Um,
[2:37:14]
you know, to make sure that we are
[2:37:16]
reaching our public and our citizens.
[2:37:19]
This is their, you know, document. It's
[2:37:21]
our guiding legal document. Um, so I
[2:37:24]
don't think we can do enough um to
[2:37:26]
ensure that our citizens are being
[2:37:28]
reached. Miss Cooper, did you have
[2:37:29]
something?
[2:37:29]
>> Yes. And we we're still keeping up the
[2:37:32]
page for the zoning ordinance and that
[2:37:34]
notifies individuals too when we put
[2:37:36]
something new up there. So, we'll be
[2:37:39]
using that. Also, I thought about too,
[2:37:42]
it doesn't um reach everybody, but we
[2:37:45]
still do the planning monthly. Um
[2:37:47]
there's always space where we could put
[2:37:50]
um something about what because staff
[2:37:52]
should know if we're far ahead or if
[2:37:54]
we're running a little bit behind um of
[2:37:57]
what articles we would be talking about
[2:37:59]
or if it's just one article. Um I can
[2:38:03]
probably I thought about talking to um
[2:38:06]
Mr. Tosh and see if he had any other
[2:38:08]
ideas to be able to get the word out. I
[2:38:11]
mean, we can put it on our Facebook
[2:38:13]
page, have it on our website, have it on
[2:38:16]
that site um to try to get out to people
[2:38:20]
um to at least get them to look at to
[2:38:23]
see what affects them. Yeah. And I think
[2:38:25]
the board's in concurrence about the
[2:38:27]
communication pieces. Am I uh not
[2:38:30]
speaking representative of everyone up
[2:38:32]
here? Um so that's great. So, Victor,
[2:38:35]
back to my question. you're going to be
[2:38:37]
evaluating against
[2:38:40]
the draft, keeping in mind what the um
[2:38:43]
foundational document looks like. Will
[2:38:46]
you be able to redline your changes so
[2:38:49]
that we can we don't have to read
[2:38:51]
everything and look at footnotes? Can
[2:38:53]
you redline your changes? I think given
[2:38:57]
what [clears throat]
[2:38:58]
that's challenging because the way
[2:39:00]
chapter 25 is set up versus the new
[2:39:03]
format that we're using to identify via
[2:39:06]
redlinining process has been the
[2:39:08]
challenge. My expectation is that you'll
[2:39:11]
be able to
[2:39:14]
my desire is to see to it that it's
[2:39:17]
obvious as to what got removed or
[2:39:20]
carried over.
[2:39:21]
>> I would just ask you keep that in mind
[2:39:23]
as a request. That's just me. I don't
[2:39:25]
know what the board, you know,
[2:39:26]
>> I think everybody wants that.
[2:39:27]
>> Okay. Well, I my colleagues can weigh in
[2:39:30]
as they wish. Um, for
[2:39:32]
>> we support that.
[2:39:33]
>> Okay. Anybody else on the board have any
[2:39:36]
Mr.
[2:39:36]
>> One request, Lisa, if you could, when
[2:39:38]
you put this information out, you may
[2:39:40]
put an asterk that this pertains to the
[2:39:43]
zoned sections of Franklin County and
[2:39:45]
not the unzoneed sections of Franklin
[2:39:47]
County.
[2:39:47]
>> Okay. So that the little lady that
[2:39:50]
called me back in the spring was scared
[2:39:53]
to death that she was going to have to
[2:39:54]
get rid of her chickens.
[2:39:55]
>> Yeah.
[2:39:56]
>> And I mean she was she was scared,
[2:40:00]
>> right?
[2:40:00]
>> And because she didn't understand grant,
[2:40:02]
you know, she's probably in her early
[2:40:04]
80s and and this really worried her and
[2:40:07]
uh I assured her that she did not have
[2:40:09]
to get rid of her chicken. So if you
[2:40:11]
will put that on there that this is for
[2:40:13]
the zoned area, not the unzoned area.
[2:40:17]
And my my closing remark if I could. Um
[2:40:19]
and of course my colleagues may have
[2:40:21]
some closing remarks. Um I think you've
[2:40:25]
heard me say numerous times. I think the
[2:40:26]
board has even said it. Um my personal
[2:40:30]
opinion on the document that that we
[2:40:33]
had. Um we want to see a document that
[2:40:37]
is Franklin County.
[2:40:40]
Um, you know, and I know it it's helpful
[2:40:42]
to do other locality comparisons to see
[2:40:45]
where we to see where we sit regionally
[2:40:48]
perhaps, but you know, the focus on
[2:40:51]
making sure that the needs of Franklin
[2:40:52]
County are being met through the zoning
[2:40:55]
ordinance and with best practices of
[2:40:57]
course in place, finding that balance, I
[2:40:59]
think, is going to be critical.
[2:41:01]
>> I think what um we believe you'll end up
[2:41:04]
with is a document that can take on any
[2:41:07]
kind of question.
[2:41:08]
>> Yes.
[2:41:09]
um [clears throat]
[2:41:10]
and and have staff be able to provide
[2:41:13]
leadership answers and also citizens
[2:41:15]
answers because of the way it's going to
[2:41:17]
be formatted. You take your specific
[2:41:19]
issue or scenario and you know where
[2:41:22]
those different aspects align
[2:41:25]
>> so that um we're not talking about well
[2:41:28]
I don't know let's make a good guess.
[2:41:30]
That's what we're trying to make happen.
[2:41:31]
>> So
[2:41:32]
>> with the new format that's possible. I
[2:41:33]
do have one more thing to bring up.
[2:41:34]
>> Oh please I'm sorry. Please go ahead.
[2:41:38]
Um, so I'm assuming [snorts]
[2:41:40]
right now this schedule we can move
[2:41:42]
forward with and that we're going to go
[2:41:44]
ahead uh analyzing the format that was
[2:41:47]
proposed to make sure it is very user
[2:41:50]
friendly. That's our objective.
[2:41:51]
>> Let's get a quick Okay. Is everybody
[2:41:54]
okay with the schedule and the
[2:41:56]
formatting that's been discussed?
[2:41:58]
>> Okay, there you go. Victor,
[2:42:00]
>> I um want to take this opportunity to
[2:42:02]
inform the board that our monthly
[2:42:05]
meetings um have several public comment
[2:42:08]
recommendations
[2:42:10]
that we
[2:42:12]
focus our initial efforts on simply
[2:42:15]
drafting an amendment to the current
[2:42:18]
zoning ordinance that addresses all
[2:42:20]
conditions and standards related to data
[2:42:23]
centers.
[2:42:27]
And I thought it was incumbent upon us
[2:42:28]
to make you aware, I'm sure you are, but
[2:42:32]
that we have been asked by the citizens
[2:42:34]
to instead of waiting for the entire
[2:42:37]
zoning ordinance to be reviewed and
[2:42:39]
proposed as adoption ready
[2:42:43]
data centers right now in this format is
[2:42:46]
in during the commercial industrial
[2:42:48]
section.
[2:42:50]
>> So we're talking about March.
[2:42:54]
We don't know what the desire is of the
[2:42:56]
board right now. What we did is we gave
[2:42:57]
you what you asked us to do. This is our
[2:43:00]
process. But we don't know if the board
[2:43:02]
says you know there are certain things
[2:43:05]
that we feel are so important. Let's get
[2:43:08]
them done first now
[2:43:10]
as you go through the process of
[2:43:12]
reviewing. You can get back to that. But
[2:43:14]
there's certain things you want done
[2:43:16]
now. And obviously data centers are the
[2:43:18]
popular thing. So, we just wanted to ask
[2:43:21]
if the board wants us to proceed as
[2:43:24]
scheduled or is there something you
[2:43:26]
think we should do now as a proposed
[2:43:29]
amendment to the current zoning
[2:43:31]
ordinance?
[2:43:32]
>> Okay, that's a great question. Um, let's
[2:43:35]
have some feedback, Mr. Tatum.
[2:43:36]
>> I I personally I think this needs to be
[2:43:39]
a countywide ordinance that we need to
[2:43:41]
look at. Not
[2:43:42]
>> I'm sorry. [clears throat] This this
[2:43:44]
particular item needs to be looked at as
[2:43:46]
a countywide ordinance similar to our
[2:43:49]
solar farm ordinance that we have that
[2:43:52]
limits uh the acreage and sets, you
[2:43:56]
know, sets the guidelines as far as
[2:43:57]
setbacks and this sort of thing. Um not
[2:44:00]
just protection and in the zoned areas.
[2:44:04]
This is something that we need
[2:44:06]
countywide so that the entire county is
[2:44:08]
protected because this is a major
[2:44:11]
concern for everybody in Franklin
[2:44:14]
County. And uh you know, right now I've
[2:44:17]
had I've been explaining to people left
[2:44:21]
and right in my district that where
[2:44:23]
we're not zoned that we currently have
[2:44:26]
no protections against a data center.
[2:44:30]
And so that may require some some help
[2:44:34]
from our our county attorney as some
[2:44:37]
guidance as to where to go with this.
[2:44:39]
But I would like to see this expanded
[2:44:42]
not just for as a zoning uh ordinance
[2:44:47]
plan as part of our county zoning, but a
[2:44:50]
ordinance countywide
[2:44:53]
that puts some restrictions in place
[2:44:55]
that that we can enforce that gives that
[2:44:58]
offers some protections.
[2:45:01]
>> So, Mr. Mr. Tatum, what I'm hearing with
[2:45:03]
the question that's on the table is you
[2:45:06]
would like the data center ordinance to
[2:45:08]
be pulled to be worked on.
[2:45:09]
>> I'd like for it needs to be immediate
[2:45:12]
and that's the feedback we need. That's important to the people and we
[2:45:17]
need to get those those uh standards in
[2:45:19]
place and those protections in place.
[2:45:21]
>> All right, Mr. Mitchell. Thank you, Mr.
[2:45:23]
Tatum. Okay, Mr. Mitchell.
[2:45:24]
>> So [clears throat] So Tatum has brought
[2:45:26]
that up several times. So
[2:45:30]
Mr. Dadak, would you please give us an
[2:45:32]
answer on how an ordinance works in an
[2:45:35]
unzoned area and what type of protection
[2:45:37]
there is in an unzoned area for these
[2:45:39]
type things?
[2:45:40]
>> It's going to be hard on data centers on
[2:45:43]
the solar farms. The reason the comp
[2:45:45]
plan gives protection to the zoned areas
[2:45:47]
with 2232 review which gives you that
[2:45:51]
enforcement mechanism where you actually
[2:45:52]
have to approve a solar farm in
[2:45:54]
non-zoned areas. Without that review,
[2:45:58]
you could have solar farm
[2:46:01]
language in your comp plan, but you have
[2:46:03]
no way to enforce it because they would
[2:46:05]
never have to come to you for approval.
[2:46:07]
Um, as part of this process, I will keep
[2:46:10]
looking, but I'll be honest, it's
[2:46:13]
you can enforce building code, fire
[2:46:15]
code, electrical code, you know, things
[2:46:18]
that are countywide and that have
[2:46:21]
statutory basis in something other than
[2:46:23]
zoning. But the problem is in terms of
[2:46:25]
regulating land use, the attorney
[2:46:28]
general opinions, the law is pretty
[2:46:30]
clear. It's it's zoning where the county
[2:46:33]
can use police powers to regulate land
[2:46:35]
use. We will look at every possible
[2:46:38]
avenue in terms of what other
[2:46:39]
enforcement there can be, but it it it's
[2:46:42]
going to be hard. We will take a close
[2:46:44]
look, but it doesn't have an easy answer
[2:46:46]
like the solar farms do where there is a
[2:46:49]
comp plan review that requires approval.
[2:46:51]
So zoning being the only way to affect
[2:46:54]
land use,
[2:46:56]
>> that is the only way to regulate land
[2:46:57]
use. That's correct. For example, with
[2:46:59]
the short-term rentals, there's a
[2:47:01]
statute that talks about that you can
[2:47:02]
require registration of short-term
[2:47:04]
rentals. And that's how we have that in
[2:47:06]
non-zoned areas. But for non-zoned
[2:47:08]
areas, you have to find a statutory
[2:47:10]
authority other than zoning for you to
[2:47:12]
do anything in terms of land use in your
[2:47:15]
non-zoned areas. Obviously, you got
[2:47:17]
building permits, all that. That's
[2:47:19]
countywide. That's not zoning. But to
[2:47:21]
regulate the land use, to approve a land
[2:47:23]
use, that's zoning.
[2:47:25]
>> So that's how you have a control over
[2:47:26]
short-term rentals, mobile home parks,
[2:47:29]
and things like that in a non-zoned
[2:47:31]
area. But when it comes to a land use,
[2:47:32]
which for these examples would be solar
[2:47:35]
farms and data and data centers, there
[2:47:38]
is no protection in an unzoneed.
[2:47:41]
>> Well, for solar farms, they're they're considered a utility facility.
[2:47:46]
So they had the 2232 review process,
[2:47:48]
>> but if they come up in conformance,
[2:47:50]
>> if they come up in conformance,
[2:47:52]
>> yeah,
[2:47:53]
>> we're obligated by law.
[2:47:55]
>> That's correct. Um, so for example, data
[2:47:58]
centers right now, you could add comp
[2:47:59]
plan language, but it would never come
[2:48:02]
to you as a comp plan approval unless
[2:48:06]
the stat unless they make data centers a
[2:48:09]
utility facility on 2232, but that's up
[2:48:11]
to Richmond, unfortunately. Not. We
[2:48:13]
could change that in the comp plan and
[2:48:15]
they can still get around it.
[2:48:16]
>> That's right. Because there's no
[2:48:18]
enforcement mechanism right now under
[2:48:19]
the statutory scheme that Richmond's
[2:48:22]
given you. Um cuz like with the utility
[2:48:25]
solar farms, you know, we've got a 1500
[2:48:27]
acre cap and so cuz we questioned this
[2:48:31]
fairly recently about the non-zoned
[2:48:33]
areas and if their acreage counted
[2:48:36]
against the overall county cap of 1500
[2:48:39]
acres and I believe if I'm correct that
[2:48:43]
it the non-zoned areas are included
[2:48:46]
um and added into that number. Am I
[2:48:49]
correct in that?
[2:48:49]
>> And that's correct and again that's
[2:48:51]
because of 2232 review. Right. Okay.
[2:48:53]
>> For example, you could have your comp
[2:48:54]
plan an acreage limits for anything you
[2:48:56]
want, right? But without you having to
[2:48:59]
approve it, you could have an acreage
[2:49:00]
cap for industrial uh stock farms,
[2:49:03]
right? But poultry farms, but industrial
[2:49:06]
poultry farms never come to you in in a
[2:49:08]
non-zone area for approval. So it it you
[2:49:11]
just have no enforcing mechanism. Can
[2:49:14]
that excuse me, can that cap be reduced
[2:49:18]
and changed
[2:49:21]
>> for solar farms? Sure. Um, now the only
[2:49:24]
problem you'd run into if you've already
[2:49:26]
approved above that cap, you you
[2:49:29]
probably can't take away an already
[2:49:31]
approved
[2:49:32]
>> um I assume for so let's use solar farms
[2:49:36]
example. If you lower the cap and you
[2:49:37]
already approved a solar farm and the
[2:49:39]
acreage cap exceeds that, you're going
[2:49:41]
to come into a vested right issue. But
[2:49:43]
yeah, you you can change the cap.
[2:49:45]
>> I'm outside of that.
[2:49:46]
>> I'm going to take it just a step deeper.
[2:49:48]
>> If you went in the comp plan and decided
[2:49:52]
>> you want to take it down to nothing. Say
[2:49:54]
we want to drop it to the the amount of
[2:49:56]
acres we have right now.
[2:49:58]
>> Mhm.
[2:49:58]
>> That we've already approved. I think the
[2:50:00]
county is so the other night that makes
[2:50:02]
three.
[2:50:02]
>> Mhm.
[2:50:03]
>> If we want to drop it to where those are
[2:50:05]
now, how would that play out? For
[2:50:08]
example, let's say there was one that
[2:50:10]
already came forward, got denied, and
[2:50:13]
wanted to come back and try again like
[2:50:16]
the last one did,
[2:50:18]
but you dropped the total acreage in
[2:50:20]
your comp plan. How would that play out
[2:50:23]
in court?
[2:50:24]
>> Oh, [snorts] in court, I can't guarantee
[2:50:27]
that, right? I mean, I I suppose they challenge the constitutionality and
[2:50:31]
whatever arguments they come up with as
[2:50:33]
to the cap, but um it would certainly be
[2:50:35]
defensible on the 2232 review for denial
[2:50:38]
because it be in your comp plan.
[2:50:40]
>> Um you know what how that plays out in
[2:50:43]
court, I can't guarantee you, but
[2:50:45]
certainly you have an enforcement
[2:50:47]
mechanism that's defensible. It's your
[2:50:50]
22, it's in your comp plan. Comp plan is
[2:50:52]
what you look at for your 2232 review.
[2:50:54]
It's it dictates 2232 review. It's not a
[2:50:57]
guide like in best use permits. It's the
[2:50:59]
end all be all, right? Um, so that would
[2:51:02]
give you grounds for denial of another
[2:51:05]
solar farm if you already hit your cap.
[2:51:08]
>> Okay.
[2:51:09]
>> So, does that answer the question about
[2:51:10]
the non-zoned areas?
[2:51:12]
>> And Mr. We will continue looking at what
[2:51:15]
pension enforcement mechanism there are.
[2:51:16]
There just is no easy.
[2:51:19]
>> Yeah, I think we have to be careful of
[2:51:20]
confusing the solar and the data
[2:51:23]
centers. They're not treated the same by
[2:51:25]
the state legislation.
[2:51:26]
>> That's right. State legislation
[2:51:28]
specifically considers solar a utility.
[2:51:31]
>> Yeah.
[2:51:31]
>> Which is why they're why they're
[2:51:33]
reviewed under 2232. They do not have
[2:51:35]
the same language for data centers,
[2:51:38]
>> right, at this time
[2:51:39]
>> at correct.
[2:51:40]
>> Subject to change.
[2:51:41]
>> Yeah.
[2:51:42]
>> So, we need to lobby Richmond.
[2:51:45]
>> Yes.
[2:51:46]
>> Okay.
[2:51:46]
>> Yes, sir. And far as the data centers,
[2:51:49]
we in the unzone, we have we cannot put
[2:51:52]
restrictions on it as far as noise,
[2:51:56]
power, water, anything like that. Even
[2:51:58]
in the nonzone areas, we cannot
[2:52:00]
>> you cannot put any restrictions that
[2:52:01]
don't apply to everything, right? You
[2:52:04]
can have your noise ordinance can be
[2:52:06]
nonzone areas, but it'll have to be a
[2:52:09]
countywide noise ordinance, right? You
[2:52:11]
can't specify for this use
[2:52:14]
>> we have a noise ordinance of X.
[2:52:17]
>> But
[2:52:18]
if I can just interrupt briefly, Mr.
[2:52:20]
Jameson, but to his point, the noise
[2:52:24]
piece like if if the planning commission
[2:52:27]
is going to um articulate with more
[2:52:30]
specificity, then we have a noise
[2:52:32]
ordinance.
[2:52:34]
Um, so is it implied that the countywide
[2:52:38]
noise ordinance is implied in a data
[2:52:42]
center in a non-zoned area or does it
[2:52:44]
have to be spelled out as such?
[2:52:49]
» I think I can speak to that because it's
[2:52:51]
really our current noise ordinance is
[2:52:52]
really for amplified sound.
[2:52:54]
>> Oh, that's noise. So
[2:52:55]
>> that's all right.
[2:52:56]
>> It really doesn't apply to the zoned
[2:52:58]
area to be honest unless it's, you know,
[2:53:00]
concert amplified sound, something like
[2:53:02]
that.
[2:53:05]
power consumption, water. I mean,
[2:53:09]
there's no way to we can attach that to
[2:53:11]
nonzone.
[2:53:13]
>> Not that I'm aware of,
[2:53:14]
>> you know, throughout the county.
[2:53:16]
>> I think as long as you're conforming
[2:53:18]
with the TW uh with 2232
[2:53:21]
and you're conforming with the comp
[2:53:23]
plan, you're done.
[2:53:25]
>> Is that right?
[2:53:25]
>> And that's why I was saying you have to
[2:53:27]
be careful that mixing the two together.
[2:53:29]
The data centers are not subject to 2232
[2:53:32]
review. solar is. So that's where
[2:53:35]
they're not treated the same when it
[2:53:37]
comes to the comprehensive plan. But
[2:53:38]
>> could we put together a countywide
[2:53:41]
ordinance that limits uh industrial use,
[2:53:46]
say puts a limit on water, daily water
[2:53:48]
usage and daily power usage
[2:53:52]
>> in the zoned areas
[2:53:54]
>> in the countywide. I mean it would have
[2:53:56]
to be countywide to include the unzoned
[2:53:59]
areas.
[2:54:00]
>> They going to come county water. my
[2:54:01]
cattle are drinking.
[2:54:03]
>> You'll have to do that.
[2:54:08]
» I mean, that's just I'm throwing out a
[2:54:10]
hypothetical. Is that a a possibility?
[2:54:13]
>> I will look into it. My initial reaction
[2:54:14]
is is is doubtful.
[2:54:16]
>> Okay.
[2:54:17]
>> Because you're you're going to you're
[2:54:18]
trying to tie it to a use, right? You're
[2:54:20]
for industrial use. Well, the moment
[2:54:22]
you're tying it to land use, you're
[2:54:23]
under into trouble in non-zoned areas
[2:54:25]
because you're you're regulating land
[2:54:26]
use. Um but like I said, we will look
[2:54:29]
into all potential avenues given the
[2:54:31]
board's um feedback on that.
[2:54:33]
>> All right. Thank you.
[2:54:34]
>> So, Mr. Jameson, um have you had your
[2:54:36]
questions answered, sir?
[2:54:38]
>> Mr. Carter,
[2:54:40]
>> I would like for them to work on the
[2:54:43]
data first, the data centers. And for me
[2:54:47]
personally, and I don't know if we can
[2:54:49]
do it, I would like to ban them
[2:54:51]
everywhere in the county except where
[2:54:53]
they're allowed by right at this point.
[2:54:57]
That pretty much is what we have,
[2:55:01]
>> right?
[2:55:02]
>> Well,
[2:55:02]
>> they're only they're only allowed in the
[2:55:05]
industrial, right?
[2:55:06]
>> In the zoned area, but they're allowed
[2:55:07]
anywhere in the non-zoned area. Correct.
[2:55:09]
>> So,
[2:55:10]
>> I think your suggestion was banned
[2:55:13]
countywide except for the
[2:55:15]
>> Yeah. And I'm not sure not sure we have
[2:55:17]
the ability to do that,
[2:55:19]
>> Mr. Dick.
[2:55:22]
>> Well, until it was challenged.
[2:55:25]
Well, so let me rephrase. My legal
[2:55:27]
advice is probably not. Obviously, I
[2:55:30]
just adise you you could adopt that
[2:55:32]
ordinance and wait for it to be
[2:55:34]
challenged.
[2:55:37]
>> Okay. Mr. Mitchell, did you have
[2:55:39]
anything further? Uh any if you want to
[2:55:41]
pull the data center orders?
[2:55:43]
>> I think the planning commission should
[2:55:44]
make that decision itself.
[2:55:45]
>> Okay.
[2:55:46]
>> I think that um if that's something that
[2:55:48]
they feel if that's something they're
[2:55:50]
getting feedback on that they need to
[2:55:51]
do, that's fine.
[2:55:53]
There's nothing we can do unless the
[2:55:56]
unzoned areas want to become zoned.
[2:55:58]
There's nothing we can do about that
[2:56:00]
>> in the unzone.
[2:56:01]
>> There's nothing we can do about that. Um
[2:56:04]
you can't have you can't you can't have
[2:56:08]
your property not zoned but want your
[2:56:09]
neighbor zoned. That's just the way it
[2:56:11]
is. Um and as far as the zoned areas,
[2:56:14]
there's only one spot in the entire
[2:56:16]
county that is by right.
[2:56:17]
>> That's right.
[2:56:18]
>> For it. So, if the if the planning
[2:56:20]
commission wishes to pull this and work
[2:56:22]
on it separately first, I'm fine with
[2:56:24]
that. However, I'm I'm not interested in
[2:56:28]
dabbling in any of the rest of it.
[2:56:30]
>> Understand, Mr. Quinn.
[2:56:34]
>> I I would pretend to let them proceed as
[2:56:37]
they've laid out the schedule and not
[2:56:38]
pull the data center forward. um myself
[2:56:41]
I I do think it's worthwhile to have
[2:56:43]
some kind of legal analysis of the
[2:56:45]
regional business park designation or
[2:56:48]
category for uh summit just because
[2:56:51]
there have been so many questions about
[2:56:52]
okay what happened back in 2016 and was
[2:56:55]
it done properly and is it is it still
[2:56:57]
valid and and I believe it is based on
[2:57:00]
everything I've looked over however it's
[2:57:02]
such a contentious area in such a
[2:57:04]
contentious category that it feels like
[2:57:06]
it would be worth getting some legal
[2:57:08]
input on that one area of legal
[2:57:10]
analysis.
[2:57:13]
» So
[2:57:15]
I've got
[2:57:18]
you were for to pull the data center
[2:57:20]
out. So three to pull. You were not to
[2:57:23]
pull.
[2:57:23]
>> Doesn't matter to me. Planning
[2:57:25]
commission make that decision.
[2:57:26]
>> Okay. And and Dan, you are not to pull.
[2:57:28]
>> Yeah. Not to pull.
[2:57:29]
>> Not to pull. Okay. Alrighty then. Um
[2:57:34]
Nick, come on now.
[2:57:36]
>> [laughter]
[2:57:37]
>> Um,
[2:57:38]
>> I say they stick to their schedule.
[2:57:40]
>> You know, when I talked to my planning
[2:57:42]
commissioner, uh, Ron Jefferson, uh, and
[2:57:44]
we briefly discussed this topic. Um,
[2:57:49]
my first, uh, response to him was, "We
[2:57:52]
have a planning commission. We need to
[2:57:55]
empower the planning commission to do
[2:57:56]
its job."
[2:57:58]
And if the planning commission feels
[2:58:02]
that you need to pull certain ordinances
[2:58:05]
to work on in your schedule, um pull
[2:58:08]
them out. My initial comment was that's
[2:58:12]
under your purview um as a planning
[2:58:15]
commission and you're appointed by us.
[2:58:17]
Um and I know you all were looking for
[2:58:19]
some feedback from the board to make
[2:58:22]
sure that we can stay as closely aligned
[2:58:24]
as possible. Um and we appreciate that.
[2:58:27]
um very much. Um I am okay either way.
[2:58:32]
I'm I'm kind of like Nick. I want you
[2:58:33]
all empowered to do what you've been
[2:58:35]
placed there to do. Um the data center
[2:58:38]
issue certainly is something. Um the
[2:58:41]
what I worry about um if I worry about
[2:58:44]
anything relative to the ordinance
[2:58:46]
number one um I think that and I told
[2:58:49]
Ron this the ordinance I really
[2:58:52]
encourage you guys um to really do some
[2:58:54]
due diligence and talking to surrounding
[2:58:56]
localities and looking at some of their
[2:58:59]
ordinances because as I work around the
[2:59:01]
state there's some differences in
[2:59:03]
locality ordinances and just to kind of
[2:59:06]
get a feel for are there standards or
[2:59:09]
are there not and we've got to make it
[2:59:11]
fit Franklin County, of course, first
[2:59:13]
and foremost. So, I encourage that. Um,
[2:59:17]
of course, our citizens feedback is
[2:59:19]
critical. Um, but, you know, I really
[2:59:22]
want you all empowered to do what we put
[2:59:24]
you there to do. Um, I can go either way
[2:59:28]
with it. If if the planning commission
[2:59:29]
feels that you've got enough um you know
[2:59:32]
if there's a a sense of urgency within
[2:59:34]
the commission to pull it um I don't
[2:59:37]
think anybody on this board I think
[2:59:39]
you've got the support to pull it. Um I
[2:59:41]
don't hear anybody I mean Mr. Quinn I
[2:59:43]
think um you don't want it pulled.
[2:59:49]
» Okay then I think we're very close on
[2:59:51]
this. So is that helpful to you Victor?
[2:59:53]
I think we're
[2:59:54]
>> Let me tell you what I think I heard.
[2:59:56]
>> Okay. So um and first of all we did this
[3:00:01]
in when the data center really just blew
[3:00:04]
up. We were seeking to understand
[3:00:08]
political will as to desire you're the
[3:00:10]
leadership.
[3:00:12]
We were comfortable with this schedule.
[3:00:14]
We just didn't know whether you were
[3:00:15]
comfortable with waiting that long.
[3:00:17]
>> No. [laughter]
[3:00:19]
But we understand
[3:00:20]
>> and I'm not speaking now totally on
[3:00:22]
behalf of the of the planning commission
[3:00:24]
because I'm going to take this back to
[3:00:26]
the planning commission to say okay
[3:00:28]
um you have a lot of trust in us and if
[3:00:32]
we can adjust this schedule move up the
[3:00:34]
data center thing soonest you'd
[3:00:36]
appreciate it and that would be welcomed
[3:00:39]
and we would get the support to adjust
[3:00:41]
the schedule accordingly
[3:00:42]
>> and I think what you've heard is we
[3:00:45]
believe it's under your purview to make
[3:00:46]
that decision and this board will
[3:00:48]
support the planning commission's
[3:00:50]
decision.
[3:00:51]
>> All right. So, um we'll work with staff.
[3:00:54]
Also, I've got to tell you, I hope we
[3:00:56]
can have a panel discussion for the
[3:00:59]
community
[3:01:00]
um and seek the subject matter experts
[3:01:03]
that can be uh received as unbiased
[3:01:07]
so that we are t making decisions about
[3:01:09]
what's appropriate. And we will have to
[3:01:12]
take a look around uh in other
[3:01:14]
localities to find out how they have
[3:01:16]
figured out proper conditions and
[3:01:17]
standards that are or are not working.
[3:01:20]
So
[3:01:20]
>> yeah and and Victor just you know um as
[3:01:23]
aside um since data centers you know in
[3:01:27]
southwest Virginia are now very
[3:01:30]
prevalent topic for the localities here.
[3:01:33]
Um there's so much rhetoric out there
[3:01:35]
and and non-factual information. I
[3:01:39]
personally think some of it perhaps
[3:01:41]
originated maybe back 10 or 15 years ago
[3:01:45]
and as Northern Virginia has increased
[3:01:47]
its data center density basically and I
[3:01:50]
use loosely a data center on every
[3:01:52]
corner and then residential
[3:01:54]
neighborhoods have just been built
[3:01:55]
around some of these data centers. you
[3:01:57]
know, if you've got a conglomeration of
[3:01:59]
data centers and my logic tells me that
[3:02:02]
if there's any uh adverse consequences,
[3:02:05]
they get magnified
[3:02:06]
simply by virtue of density.
[3:02:09]
>> Um, and I also know from, you know, some
[3:02:12]
research that I'm doing and working
[3:02:13]
across the state, you know, there are
[3:02:17]
things are not the same way today in
[3:02:19]
terms of how data centers function,
[3:02:23]
their efficiency or lack thereof, etc.
[3:02:25]
what are the the consequences, pros and
[3:02:29]
cons? And when I talk to Ron, I I
[3:02:32]
express that because I think what for me
[3:02:35]
and my colleagues can speak for
[3:02:36]
themselves, I think we really need to to
[3:02:39]
structure our ordinance around what we
[3:02:40]
know today. Um, and I think we've got
[3:02:43]
to, you know, really take the rhetoric
[3:02:44]
out of the picture and we've got to look
[3:02:46]
objectively at at what it is. And then
[3:02:49]
you'll be able and through your research
[3:02:52]
of doing that, you'll be able to craft
[3:02:54]
um and adjust that ordinance, I think,
[3:02:56]
accordingly. Mr. Carter.
[3:02:58]
>> Yes. Uh Steve, could you maybe contact
[3:03:01]
Jim Hutsler, the board I serve on at
[3:03:03]
Veco, Energy and Agriculture, and get
[3:03:06]
some of those PowerPoint presentations
[3:03:08]
they've had on data centers, and and get
[3:03:11]
it to Victor and the planning
[3:03:13]
commission. That's a great idea.
[3:03:14]
Certainly. and I've already been in
[3:03:16]
conversation with with them and we have
[3:03:18]
some information compiled and I think we
[3:03:20]
can help with setting up that panel
[3:03:22]
you're talking about.
[3:03:24]
>> Yeah,
[3:03:25]
>> that concludes my comments.
[3:03:26]
>> Is this giving you the guidance that you
[3:03:28]
need, Mr. Evans?
[3:03:29]
>> Thank you.
[3:03:30]
>> Well, we appreciate and please convey
[3:03:32]
our gratitude um to the planning
[3:03:34]
commission. um we know you're going to
[3:03:36]
be working really hard and um you all
[3:03:39]
are volunteers and you step up and you
[3:03:42]
give of your of your time and that does
[3:03:44]
not go unnoticed and we are very
[3:03:46]
grateful for that.
[3:03:47]
>> Appreciate it. Thank you for for your
[3:03:49]
support
[3:03:49]
>> of course. Okay, our last item on our
[3:03:52]
agenda um is to discuss the Boone Mill
[3:03:56]
vacancy that we have. Um I have given
[3:03:59]
each of you um just uh a version of
[3:04:03]
guidance and it's a draft. Uh what you
[3:04:05]
have in front of you um Mr. Gwyn and his
[3:04:09]
associates um they drafted the second
[3:04:13]
document which is in um chart form. They
[3:04:16]
have drafted these timelines based upon
[3:04:20]
um deadlines. The the piece that I have
[3:04:24]
given you is more specific. Um what I
[3:04:27]
will say what I will do is just briefly
[3:04:30]
run down this and what we're going to
[3:04:31]
the outcome of today um we need to set
[3:04:35]
some dates given what's on this and um
[3:04:38]
so just let me just run down for public
[3:04:40]
record um that we've got one month under
[3:04:43]
statute um to fill this vacancy.
[3:04:46]
>> I I apologize Madam Chairman. It's 45
[3:04:49]
days.
[3:04:50]
>> It's 45.
[3:04:51]
>> Yeah.
[3:04:51]
>> Nobody has said that to me.
[3:04:53]
>> It's actually 45 to your point. Yes. I
[3:04:55]
apologize. I believe Mr. Gwyn's chart is
[3:04:59]
assuming you wanted to appoint someone
[3:05:01]
by your next meeting. You technically do
[3:05:04]
have more time.
[3:05:07]
>> Okay.
[3:05:08]
>> But
[3:05:09]
>> okay,
[3:05:09]
>> that that was the assumption was that
[3:05:11]
you want to appoint someone by next
[3:05:13]
meeting, but you have not much more, a
[3:05:15]
little bit more time.
[3:05:16]
>> Thank you. Thank you. Okay. 45 days um
[3:05:21]
to make the appointment and the timeline
[3:05:24]
um began yesterday, Wednesday, August
[3:05:27]
19th. Um and so the uh statutory time
[3:05:32]
that Mr. Gwyn has given us is September
[3:05:34]
14th uh for uh the appointment to be
[3:05:38]
made. Are you in concurrence with this
[3:05:40]
chart, Mr. Dadak?
[3:05:46]
» So that's
[3:05:47]
>> that's my question. This throws all this
[3:05:49]
out of out in
[3:05:51]
>> you have 45 days to appoint someone
[3:05:54]
under a statute.
[3:05:56]
The assumption was I I I apologize it
[3:05:59]
wasn't part of conversation but this
[3:06:01]
chart is as he described an aggressive
[3:06:03]
timeline to appoint someone by your next
[3:06:05]
meeting.
[3:06:06]
>> Under a statute you have 45 days to
[3:06:08]
appoint someone.
[3:06:09]
>> But I still think Lori what we should do
[3:06:11]
is try to stick to this timeline and
[3:06:13]
hope it works out.
[3:06:14]
>> I agree.
[3:06:14]
>> And just not worry about the 15 days
[3:06:16]
unless we have to. I agree.
[3:06:17]
>> 15 days.
[3:06:18]
>> Yeah, if we got to add 15 days later,
[3:06:20]
that's fine, but for the time being,
[3:06:21]
let's
[3:06:21]
>> I think this is doable. That's what
[3:06:22]
we're going to work through today. Mr.
[3:06:24]
Datock, thank you for that
[3:06:25]
clarification. Um, so, uh, what we are
[3:06:30]
going to do is, um, the board of
[3:06:32]
supervisors is working with staff to
[3:06:34]
post a notice for application submittal.
[3:06:38]
Um, and we will do so electronically and
[3:06:40]
via print media. Um, and we will have
[3:06:43]
that out on or about this Friday,
[3:06:46]
tomorrow, August 21st.
[3:06:48]
Uh, the notice will announce the vacancy
[3:06:51]
and it'll provide application
[3:06:53]
instructions.
[3:06:56]
[clears throat] Excuse me. U, we are
[3:06:58]
going to do our best to make sure that
[3:07:00]
um the links are on this announcement,
[3:07:03]
[cough]
[3:07:04]
excuse me, and places that you can um
[3:07:07]
pick up applications and so forth. The
[3:07:10]
deadline to apply for the vacancy is
[3:07:12]
Wednesday, September 2nd.
[3:07:15]
And all of this is going to be in the
[3:07:17]
announcement for guidance for potential
[3:07:19]
applicants. What we as a board need to
[3:07:21]
do today um if you wish to proceed um
[3:07:25]
under the the initial assumptions that I
[3:07:27]
was working under um the first item and
[3:07:30]
let's just work by this um for each
[3:07:33]
event and look at our calendars
[3:07:35]
concurrently. The first is a special
[3:07:38]
called meeting. Um and I am and these
[3:07:41]
are just suggestions gentlemen. Um uh
[3:07:44]
would be held Thursday, September 3rd.
[3:07:47]
Understanding that the deadline is
[3:07:48]
September 2nd for submitt. So September
[3:07:51]
3rd um we are required to hold a meeting
[3:07:55]
and publicly announce the applicants in
[3:07:58]
open session and that we would have
[3:08:01]
closed meeting u discussion after that.
[3:08:04]
So, I'm going to stop there. Is
[3:08:07]
everybody okay for September 3rd for a
[3:08:09]
special called meeting?
[3:08:12]
>> What's your time?
[3:08:13]
>> That's That's for you guys to tell me
[3:08:15]
what you would prefer, Mr. I've got your
[3:08:17]
note, Mr. Quinn. Thank you. Um, what
[3:08:19]
time do you all prefer on the third?
[3:08:21]
>> I prefer going around 6:00 p.m.
[3:08:24]
>> 6 p.m., Mr. Jameson,
[3:08:27]
>> I can make it work.
[3:08:28]
>> You don't like six o'clock? I don't
[3:08:30]
really like it, but that's that's
[3:08:31]
[snorts] fine. Earlier would be better
[3:08:33]
for me, but like I said, I'll make it
[3:08:35]
work. Come up with
[3:08:37]
>> Mr. Carter.
[3:08:38]
>> I'm flexible.
[3:08:40]
Six is fine.
[3:08:41]
>> Okay,
[3:08:43]
Mr. Mitchell.
[3:08:44]
>> Uh earlier would be better for me, but I
[3:08:46]
can make six workers.
[3:08:48]
>> You want to find a happy medium of five?
[3:08:49]
>> No. If if Tim needs it at 6 for him to
[3:08:51]
be here, that's when we need to do it.
[3:08:53]
>> Is that with your work schedule?
[3:08:54]
>> That that I mean, no. I can be here
[3:08:56]
earlier, but my preference would be to
[3:08:58]
later on in the evening. So, if we need
[3:09:00]
to go earlier to accommodate Marshall, I
[3:09:03]
can I can do earlier. That
[3:09:06]
>> six works the best, but I'm I'm
[3:09:08]
flexible. Like Mike said, I can go
[3:09:10]
earlier.
[3:09:11]
>> Mr. Jameson, I'm going to make sure if
[3:09:12]
we do it at 6 that
[3:09:14]
>> that probably better for the public,
[3:09:16]
right?
[3:09:16]
>> Pardon me.
[3:09:17]
>> That would probably be better six.
[3:09:19]
>> I think it would absolutely um help the
[3:09:21]
public at at any time after 5:00. I
[3:09:25]
think would So, do you all want to go
[3:09:26]
with six?
[3:09:28]
Okay. Um, I'm putting that down. Um,
[3:09:32]
my pen would work.
[3:09:35]
Okay. Thank you. I think we're okay. So,
[3:09:37]
the next item is uh a called meeting to
[3:09:40]
be held the next week. uh the week of
[3:09:43]
September se 7th through um this says
[3:09:46]
the 11th but I would really say as
[3:09:48]
you'll see um we need to conduct the
[3:09:51]
interviews between the 7th and the 10th
[3:09:55]
um and those interviews um would be
[3:09:58]
scheduled accordingly after we get the
[3:10:01]
applications and to see how many
[3:10:03]
applicants we have um the deadline to
[3:10:07]
interview is September 11th but as
[3:10:09]
you'll see the next item um is that we
[3:10:12]
would have another called meeting that
[3:10:14]
week where on September 11th um we would
[3:10:20]
um
[3:10:21]
let's see uh we would go we we have to
[3:10:24]
vote on the selected candidate on the
[3:10:26]
11th so we interview that week we have
[3:10:30]
discussion that week and we have to vote
[3:10:32]
on the candidate by the 11th which is
[3:10:35]
that Friday so uh between the dates and
[3:10:38]
this is going to be predicated of course
[3:10:40]
on the number of applicants we get. You
[3:10:43]
know, if we get two applicants, then our
[3:10:45]
interview schedule will not be too
[3:10:47]
complex. If we have five applicants, six
[3:10:50]
applicants, we'll have to work
[3:10:52]
accordingly. So, what I would suggest is
[3:10:55]
that we consider earlier in the week to
[3:10:59]
start the interview schedule in case we
[3:11:01]
need extra time after we see how many
[3:11:03]
applicants we get. So, with that said,
[3:11:07]
um does does anybody have uh avail Well,
[3:11:10]
the 7th is Labor Day. Yeah,
[3:11:12]
>> let me just say that right off hand.
[3:11:14]
>> Um
[3:11:17]
what is your pleasure uh for the 8th,
[3:11:19]
9th, and 10th for interviews?
[3:11:23]
>> I'll make it work.
[3:11:24]
>> I'm good.
[3:11:25]
>> Mr. Jameson,
[3:11:30]
» I'm good.
[3:11:32]
>> Mr. Mitchell?
[3:11:32]
>> Yeah.
[3:11:33]
>> Okay. Okay. And I've got you covered,
[3:11:35]
Mr. Quinn. Thank you. Um Okay. Um I've
[3:11:39]
got to be out of town um Tuesday for a
[3:11:43]
UVA appointment for my daughter. Um so
[3:11:46]
um I would like some grace there if I
[3:11:49]
could get some. Um could we start
[3:11:52]
interviewing um on the 9th uh starting
[3:11:57]
right after lunch? How does that work
[3:12:00]
for everybody?
[3:12:04]
Mr. Damison,
[3:12:05]
>> start on the 9th.
[3:12:09]
>> Um, and start maybe at 1:00.
[3:12:12]
How's that work for you, Mr. M?
[3:12:15]
>> Mr. Carter?
[3:12:16]
>> I'm fine with that.
[3:12:17]
>> Okay. And then if again, we'll have to
[3:12:20]
evaluate how many applicants we get and
[3:12:22]
we'll know that very soon. Um and we
[3:12:25]
will adjust the interview schedule. If
[3:12:27]
we can get the interviews um done in a
[3:12:30]
in an orderly manner depending upon
[3:12:32]
number, we might be able to complete
[3:12:34]
them on the 9th. But if we need extra
[3:12:37]
time, uh we've got that cushion day of
[3:12:39]
the 10th in there. So I would ask you to
[3:12:42]
hold the 10th open if you can if we need
[3:12:46]
that. Is everyone okay with that? So
[3:12:49]
interviews on the 9th at 1 p.m. Is that
[3:12:53]
cool?
[3:12:54]
All right. Um, and so that'll move us
[3:12:57]
into Friday the 11th, which is when, um,
[3:13:01]
you know, as we have those interviews,
[3:13:03]
we'll have close session time, you know,
[3:13:05]
during this week to deliberate, um, you
[3:13:08]
know, after the interviews and so forth
[3:13:10]
as a board. Um, and then on Friday the
[3:13:13]
11th, we need to vote on the selected
[3:13:16]
candidate in open session. So, what I
[3:13:18]
would ask is, what is your pleasure on
[3:13:21]
Friday the 11th?
[3:13:23]
um to to make the announcement of the
[3:13:26]
candidate that we uh would like to see
[3:13:28]
voted on
[3:13:31]
time.
[3:13:33]
>> Can we do it that morning? Cuz I might
[3:13:35]
be leaving to go out of town that
[3:13:36]
evening
[3:13:36]
>> and I know there's a fair anniversary
[3:13:38]
water quality monitoring dinner that
[3:13:41]
night if anybody's interested in going
[3:13:43]
to that. You want to do it in the
[3:13:44]
morning?
[3:13:45]
>> That would work good for me so we can
[3:13:47]
leave that evening.
[3:13:48]
>> Okay, Mr. Jameson
[3:13:51]
that day. I'm good. But we will vote on
[3:13:53]
them that day.
[3:13:54]
>> We will be voting. We have to
[3:13:56]
>> be gone the next week.
[3:13:57]
>> Well, I think the statute lines us up to
[3:13:59]
vote by the 14th.
[3:14:00]
>> By the 11th.
[3:14:01]
>> Yeah. Um Mr. Tatum,
[3:14:03]
>> I'm good. Just for whatever time you
[3:14:05]
say, be here.
[3:14:06]
>> Okay, Mr. Carter.
[3:14:07]
>> I'm good, but I would prefer morning.
[3:14:10]
>> Okay. And Mr. Mitchell, you said you
[3:14:12]
were okay. Correct.
[3:14:12]
>> Morning.
[3:14:13]
>> All right. So, for the 11th, um, what if
[3:14:16]
we set this at, um,
[3:14:20]
11:00 a.m., 10:00 a.m.?
[3:14:23]
>> How about 10?
[3:14:23]
>> 10.
[3:14:24]
Okay.
[3:14:25]
>> Seven.
[3:14:25]
>> All right. So,
[3:14:27]
>> 5:15.
[3:14:27]
>> We are not doing seven. Okay. All right.
[3:14:31]
So, 10:00 a.m. on the 11th um to have a
[3:14:34]
public vote on the selected candidate.
[3:14:37]
Um, and if things go according to plan,
[3:14:40]
um, you know, this has come on us very
[3:14:42]
quickly and, you know, I've been trying
[3:14:46]
to throw this stuff together, um, with
[3:14:48]
Mr. Gwyn. Um, so again, some grace
[3:14:51]
trying to get everything lined up. Um,
[3:14:55]
it would be fantastic. Our board meeting
[3:14:57]
in September comes early on the 15th,
[3:15:01]
the way the calendar lies. So, um it
[3:15:04]
would be fantastic to get our candidate
[3:15:07]
um awarded on the uh on the 11th and
[3:15:11]
then our board meeting is the 15th the
[3:15:13]
following Tuesday. So, it would be
[3:15:15]
fantastic um I think um moving forward
[3:15:18]
unless the board objects. um we could
[3:15:21]
possibly maybe get this individual sworn
[3:15:23]
in at our board meeting and have uh the
[3:15:27]
judge or the circuit court clerk here to
[3:15:29]
do so so the applicant's family could be
[3:15:32]
here and so forth. Um but that's that
[3:15:34]
again is a is a board decision for you
[3:15:36]
all to give me guidance on.
[3:15:38]
>> So is there anything what we'll do is I
[3:15:41]
will get you a memorandum of confirming
[3:15:44]
these dates and times. Of course, there
[3:15:46]
will be uh public appropriate public
[3:15:49]
notice given through Steve and his
[3:15:52]
staff, the 3-day uh public notice that
[3:15:54]
will go out to the, you know, to the
[3:15:56]
citizens and so forth to announce the
[3:15:58]
meetings and um the appropriate times
[3:16:02]
where we'll have to go into close
[3:16:03]
session with those uh code sections uh
[3:16:06]
properly announced. uh with that um and
[3:16:10]
I think I think if this was uh not as
[3:16:13]
painful as I thought it was going to be.
[3:16:14]
Thank you all for your um for your
[3:16:17]
flexibility and I will get out conf you
[3:16:19]
know confirmations on dates and times
[3:16:21]
and and what those are for just so you
[3:16:23]
can have that information moving
[3:16:25]
forward. Do you all have any comments or
[3:16:27]
questions?
[3:16:28]
>> I have a question Lori. So is this
[3:16:30]
appointment will just be for three and a
[3:16:31]
half months. Will there be a special
[3:16:33]
election in [cough]
[3:16:34]
>> this will be on the ballot next
[3:16:36]
November?
[3:16:36]
>> Oh next November. Oh, so not like the
[3:16:38]
school board position that's on this
[3:16:40]
November.
[3:16:40]
>> No, sir. That Mr. Datak with I know Jim
[3:16:43]
and I have talked about that twice.
[3:16:46]
>> Next general election. Yes, that would
[3:16:47]
be next November. So, um that Thank you
[3:16:51]
for bringing that up, Dan. That's a
[3:16:52]
really good point. And of course, um the
[3:16:55]
applicants the application will go
[3:16:56]
through a lot of this, but you know, you
[3:16:58]
have to be a resident of the Boone
[3:17:00]
District in good standing. Um all of
[3:17:02]
that will be articulated for for your
[3:17:04]
reference points. And of course, if any
[3:17:07]
applicants that you know of or friends
[3:17:10]
or neighbors in that district have any
[3:17:11]
questions, um please feel free to call
[3:17:14]
myself, Mr. Sandy, our clerk Samantha,
[3:17:17]
uh and we are happy to help you uh walk
[3:17:19]
you through [snorts] uh any information
[3:17:21]
that you need. So, am I clear that you
[3:17:24]
all are don't have any further questions
[3:17:26]
or comments on the process? Mr. Data, do
[3:17:29]
you have anything to add?
[3:17:32]
>> Not unless someone has questions. No,
[3:17:34]
thank you.
[3:17:34]
>> Okay, Mr. Sandy.
[3:17:36]
Okay. Um, is there any other business to
[3:17:39]
come before uh the board this afternoon?
[3:17:42]
Anything on your mind?
[3:17:44]
>> I have one item, Madame Clerk. I I'd
[3:17:46]
like to wish Mr. Sandy a very happy
[3:17:48]
birthday.
[3:17:49]
>> Are we supposed to sing, Tony?
[3:17:51]
[laughter]
[3:17:52]
>> Happy birth. Please don't. You don't
[3:17:54]
want me singing to you. Um, but happy
[3:17:57]
birthday.
[3:17:57]
>> Thank you.
[3:17:58]
>> Very happy birthday. Okay. So, um, I
[3:18:01]
think we're good and, um, I'm going to
[3:18:03]
adjourn the meeting. until uh se well I
[3:18:07]
guess our our meetings that'll be let's
[3:18:10]
see the first one
[3:18:11]
>> third you would have to open
[3:18:13]
>> yes September 3rd
[3:18:14]
>> open a meeting and then go into close
[3:18:15]
session
[3:18:16]
>> yeah so we're going to adjourn until
[3:18:18]
September 3rd so thank you all very much
[3:18:21]
for your time and your attention