[0:13]
Okay.
[0:14]
>> So, first we'd like to find out who we
[0:16]
» So, first we'd like to find out who we
[0:16]
have present. I can see Gary Mertoff.
[0:19]
>> Yes.
[0:20]
» Yes.
[0:20]
>> I see Dan Grady's office is online. Is
[0:23]
» I see Dan Grady's office is online. Is
[0:23]
that us or is that Dan?
[0:24]
>> His boardroom.
[0:25]
» His boardroom.
[0:25]
>> That's his boardroom. And we need to
[0:27]
» That's his boardroom. And we need to
[0:27]
know who we can see Northwest Regional
[0:30]
Planning is online. Who's with us from
[0:31]
Northwest?
[0:34]
>> This is Autumn. Emily will be joining in
[0:36]
» This is Autumn. Emily will be joining in
[0:36]
just a couple minutes as well.
[0:39]
>> Autumn and who?
[0:40]
» Autumn and who?
[0:40]
>> Emily.
[0:41]
» Emily.
[0:41]
>> Autumn. Okay. Okay. Thank you.
[0:44]
» Autumn. Okay. Okay. Thank you.
[0:44]
>> She just appeared online.
[0:47]
» She just appeared online.
[0:47]
>> And then, hi Emily. And then we need to
[0:50]
» And then, hi Emily. And then we need to
[0:50]
know who is area code 715.
[0:54]
Can I read that?
[0:55]
>> 9696732.
[0:59]
» Meaning that's me, Elizabeth Franic.
[1:01]
>> Hi Liz.
[1:02]
» Hi Liz.
[1:02]
>> Hi Liz.
[1:03]
» Hi Liz.
[1:03]
>> Okay. Glad everybody's here.
[1:04]
» Okay. Glad everybody's here.
[1:04]
>> Hi.
[1:06]
» Hi.
[1:06]
>> So uh we could take a roll call then
[1:08]
» So uh we could take a roll call then
[1:08]
please. Karisha.
[1:10]
>> Okay. George Busousay
[1:12]
» Okay. George Busousay
[1:12]
>> here.
[1:13]
» here.
[1:13]
>> Bradley Ray is excused. Elizabeth Franic
[1:17]
» Bradley Ray is excused. Elizabeth Franic
[1:17]
>> here. Pat Kenny
[1:19]
» here. Pat Kenny
[1:20]
>> here.
[1:20]
» here.
[1:20]
>> Gary Mertig
[1:22]
» Gary Mertig
[1:22]
>> here.
[1:23]
» here.
[1:23]
>> Dan Greedy is excused. Lisa Radkey.
[1:29]
» Is Lisa Radkkey online?
[1:33]
>> No. Okay. And then Charlie Ortman
[1:35]
» No. Okay. And then Charlie Ortman
[1:35]
>> here.
[1:36]
» here.
[1:36]
>> And then Paul Wilharm.
[1:42]
» Okay. So business,
[1:44]
>> first order of business will be uh this
[1:46]
» first order of business will be uh this
[1:46]
is the Ashlin County Planning Committee
[1:49]
working on the Ashlin County
[1:50]
Comprehensive Plan. Uh for anybody here
[1:53]
for public comment or uh or listening in
[1:56]
and we will be uh going over the agenda
[1:58]
as posted online. It's uh Monday, July
[2:02]
21st, 1 p.m. over at Ashlin County
[2:03]
Courthouse and my name is George Buset
[2:06]
and I'm the I chair of the committee. So
[2:08]
we start with the approval of the
[2:10]
agenda. Uh, has everybody had a chance
[2:12]
to look it over and can we have a motion
[2:15]
for an approval or comments or
[2:16]
amendments? Anybody?
[2:18]
>> Move to approve.
[2:19]
» Move to approve.
[2:19]
>> Charlie move.
[2:21]
» Charlie move.
[2:21]
>> Is that a second from you, Liz?
[2:24]
» Is that a second from you, Liz?
[2:24]
>> Yeah.
[2:25]
» Yeah.
[2:25]
>> Okay. Seconded by Liz Franek. So, the
[2:27]
» Okay. Seconded by Liz Franek. So, the
[2:27]
agenda is approved.
[2:29]
The first uh item after the approval
[2:32]
agenda is item number three, public
[2:35]
comments order. We had a motion or a
[2:36]
second, but we didn't vote.
[2:38]
>> Oh. Oh, you like to move move to Yes, I
[2:41]
» Oh. Oh, you like to move move to Yes, I
[2:41]
stand corrected that. Uh,
[2:44]
there was a second. So, all in favor of
[2:46]
approving the agenda, say I.
[2:48]
>> I. I.
[2:49]
» I. I.
[2:49]
>> Oppos.
[2:49]
» Oppos.
[2:49]
>> I.
[2:50]
» I.
[2:50]
>> Thank you for that correction. And then
[2:52]
» Thank you for that correction. And then
[2:52]
we move on to public comments. Is there
[2:55]
anybody online or present for public
[2:56]
comment?
[2:59]
Anybody online for public comment?
[3:01]
Present. Hearing. No public comment. We
[3:04]
move on to the next agenda item, which
[3:06]
is approval of the minutes of the prior
[3:08]
meeting.
[3:09]
Move to approve.
[3:11]
>> Uh, Charlie Orman moves to approve the
[3:13]
» Uh, Charlie Orman moves to approve the
[3:13]
minutes. Is there a second?
[3:19]
» This is paddle. Second.
[3:21]
>> Kenny seconds. Uh, is there discussion?
[3:25]
» Kenny seconds. Uh, is there discussion?
[3:25]
Corrections. All in favor of approving
[3:27]
the minutes of the prior meeting of June
[3:29]
17, please say I.
[3:30]
>> I.
[3:31]
» I.
[3:31]
>> I.
[3:31]
» I.
[3:31]
>> Any opposed?
[3:34]
» Any opposed?
[3:34]
>> One abstension. W Paul Wilharm abstains.
[3:38]
» One abstension. W Paul Wilharm abstains.
[3:38]
And the motion carries. So that's done.
[3:41]
So now we're on to discussion and action
[3:44]
items. And item A is little fun facts or
[3:48]
favorite things about Ashlin County.
[3:49]
Does anybody have something to offer?
[3:52]
>> Oh, could I uh if we could back up just
[3:56]
» Oh, could I uh if we could back up just
[3:56]
a minute. I'm not sure if Carver, did
[3:59]
you get here before public minutes or
[4:01]
public comments was offered?
[4:04]
>> Okay. Thank you. That All right. Thank
[4:06]
» Okay. Thank you. That All right. Thank
[4:06]
you. of note, there's a second chance to
[4:08]
public comment at the end of the agenda.
[4:11]
Anything for uh fun facts? Okay, I have
[4:14]
one thing here.
[4:19]
» Maybe you know this, but Ashlin County
[4:20]
was founded in 1854
[4:23]
by Asaf Whittley.
[4:28]
» Oh, there's Lissa. Okay, Lissa uh
[4:32]
right survived. So the panic of 1857
[4:36]
and then the Civil War nearly overcame
[4:39]
the little settlement completely.
[4:43]
But one family remained.
[4:46]
>> One family. And then in 1870 when a
[4:50]
» One family. And then in 1870 when a
[4:50]
railroad line headed in that direction,
[4:52]
it made a new start. In 1877, the first
[4:55]
railroad, the Wisconsin Central, reached
[4:57]
it. The years 1886 and 1887 saw a boom
[5:02]
caused by the realization that Ashlin
[5:04]
would be the port of the newly opened
[5:06]
Gogeic iron range. In the 80s and 90s,
[5:10]
Ashlin was also a great sawmill town. A
[5:14]
little bit of Ashlin history. Any fun
[5:16]
facts, Lissa, to add? Not today. Okay.
[5:20]
>> Uh, no. I could add a quick one. Nothing
[5:22]
» Uh, no. I could add a quick one. Nothing
[5:22]
cool like that.
[5:24]
Um well, while you're talking about
[5:26]
people history, we have lots of um
[5:28]
famous people from Ashlin, famous in the
[5:32]
big picture, maybe not famous that we
[5:33]
can claim, but um a Pulitzer
[5:36]
Prizewinning author, David Marinus. He's
[5:40]
written numerous biographies of other
[5:42]
well-known figures like Vince Lombardi.
[5:46]
Um, Lewis Robert Blake was Blake was an
[5:49]
American ice hockey player who played
[5:51]
with the Boston Bruins
[5:54]
for 17 years. And Milton Leroy Moose
[5:59]
Gardner was a professional American
[6:02]
football guard in the National Football
[6:04]
League playing for Detroit and Buffalo
[6:07]
and finally the Green Bay Packers.
[6:12]
» Thank you for that. Any more fun facts?
[6:14]
If not, we move on to item 5B, which is
[6:18]
subcommittee status reports.
[6:21]
And we usually take this in order
[6:22]
starting with uh intergovernmental. Uh
[6:25]
Mr. Ortman,
[6:26]
>> I have nothing to report at this time.
[6:30]
» I have nothing to report at this time.
[6:30]
>> Okay. Reviewing and moving along.
[6:33]
» Okay. Reviewing and moving along.
[6:33]
>> Subcommittee report from trends and
[6:35]
» Subcommittee report from trends and
[6:35]
issues. Uh Lisa Ratkkey.
[6:39]
Um, yes. I've been contacting some
[6:42]
people who have expressed in the past an
[6:45]
interest to talk about issues and
[6:46]
opportunities. We're going to do just
[6:48]
little half an hour um check-ins to pull
[6:53]
together a team who wants to look at
[6:57]
those ideas in a more formal way. that
[6:59]
they would come to one of these meetings
[7:01]
and express their opinions as well as
[7:03]
help spread the idea to their friends
[7:06]
and neighbors that these discussions
[7:09]
about issues and opportunities and
[7:11]
obstacles are are happening.
[7:17]
» Any questions for the um the transit
[7:20]
issues team? Uh then cultural resources
[7:24]
and community facilities. Uh Liz, do you
[7:26]
have something to add today?
[7:29]
nothing at this time. I'm going to be
[7:32]
inviting certain um folks to our
[7:35]
meetings I think that and putting that
[7:38]
on their agenda in the very near near
[7:42]
future. Thank you.
[7:45]
>> Uh moving on, uh agriculture, forestry,
[7:48]
» Uh moving on, uh agriculture, forestry,
[7:48]
and natural resources. that Kenny,
[7:51]
>> we had another farmland preservation
[7:53]
» we had another farmland preservation
[7:53]
meeting since the last comp plan meeting
[7:56]
and we're going to have another meeting
[7:57]
every month or so for the remainder of
[7:59]
the year. But I got a question for
[8:01]
Alyssa. Back in um December, January, we
[8:05]
had I believe three egg related
[8:08]
meetings. And so my question is why did
[8:13]
we have those meetings? How do they tie
[8:15]
into the comp plan? and the timing of
[8:17]
that before we even made assignments for
[8:20]
who would have who on the comp plan.
[8:22]
Could you explain that to me?
[8:29]
» Go ahead.
[8:31]
>> Yeah. So, um, about a year ago, I
[8:34]
» Yeah. So, um, about a year ago, I
[8:34]
started talking to Dan Grady about, um,
[8:38]
hearing from people that in the county
[8:41]
that they were very interested in making
[8:42]
sure that the new comp plan included
[8:45]
robust conversations about how extreme
[8:48]
weather was affecting county, people,
[8:51]
places, and resources.
[8:53]
And so, I was working with National Park
[8:56]
Services um, team of expert planners who
[8:59]
deal with this. and we came up with this
[9:03]
method of working with
[9:06]
each of the nine elements
[9:09]
um current plan goals and objectives and
[9:13]
making sure that they were infused with
[9:15]
issues of importance related to ex
[9:18]
extreme weather. So those were just
[9:20]
conversations around each chapter. Um we
[9:23]
we went through five chapters and then
[9:25]
the federal government um cut the people
[9:28]
on the National Park Service team. So, I
[9:31]
don't have access to them anymore, but
[9:33]
we met with transportation, natural
[9:35]
resource, agriculture, land use, and um
[9:39]
utilities and community facilities. And
[9:42]
so each of those committees when um they
[9:47]
meet with a larger group looking at all
[9:50]
egg issues in this case, not just
[9:52]
climate related or weather related that
[9:56]
they would get a copy of those
[9:58]
recommendations from that group of
[10:00]
experts and specialists and people like
[10:02]
yourself working in those areas and say,
[10:05]
"Will you please consider our
[10:07]
recommendations
[10:08]
about how the county could deal with um
[10:11]
impacts from extreme weather when you're
[10:13]
looking at your broader chapter
[10:16]
>> and then we'll have to figure out how to
[10:17]
» and then we'll have to figure out how to
[10:17]
tie that into what we're doing on the
[10:19]
comp plan going forward.
[10:21]
>> Yeah. So, the way we had set it up was
[10:24]
» Yeah. So, the way we had set it up was
[10:24]
let's say you're going to um regional
[10:26]
planning is going to have a meeting
[10:28]
scheduled to talk about the egg chapter.
[10:32]
Then everybody involved, the public can
[10:34]
have a copy. We'll post it online. will
[10:36]
certainly give it to the members and say
[10:37]
here's what a group of local and state
[10:40]
specialists had decided were good
[10:42]
recommendations to be included and then
[10:45]
that egg committee will look at those
[10:47]
and say yeah this one really fits really
[10:49]
well or this one we don't feel is viable
[10:54]
>> all right thank you
[10:55]
» all right thank you
[10:55]
>> does that sound like what you were
[10:57]
» does that sound like what you were
[10:57]
hoping okay cool and thanks for being
[11:00]
>> so I have a another question about the
[11:03]
» so I have a another question about the
[11:03]
egg section and the I don't quite
[11:06]
understand fully how the farmland
[11:08]
preservation plan work flows into the
[11:12]
comprehensive plan as is it like a third
[11:14]
section how do you see that Pat and I'd
[11:17]
like to ask the same thing of Emily how
[11:19]
does the farmland preservation plan flow
[11:22]
into the comprehensive plan
[11:23]
>> the farmland preservation plan has to be
[11:25]
» the farmland preservation plan has to be
[11:26]
updated anyway and just with the timing
[11:30]
of it all it ties in with the schedule
[11:33]
we're on and So the farmland
[11:36]
preservation plan like the forestry plan
[11:38]
is a rather lengthy document and what
[11:40]
goes in the comp plan is going to be
[11:44]
much more brief than that. Um but then
[11:47]
another round of input for the public
[11:49]
specifically for the comp plan even
[11:51]
though we have input opportunities for
[11:52]
the farmland preservation plan. So it's
[11:55]
going to provide a lot of background
[11:57]
that the whole document won't be in
[11:59]
there.
[12:01]
So does that mean we'll be utilizing a
[12:03]
lot of the background information from
[12:05]
the farmland preservation plan plan
[12:08]
for data requirements within the comp
[12:10]
plan like land usage, land mapping.
[12:14]
The topics in the farmland preservation
[12:17]
plan should provide
[12:20]
an excellent starting point for the
[12:22]
conversation on the egg component. But
[12:26]
because the comp plan is going to have
[12:27]
its own opportunities for input, we
[12:30]
shouldn't
[12:32]
um decide in advance what should go or
[12:36]
not go into the comp plan and how it
[12:38]
should be framed. So the comp plan is
[12:41]
another opportunity for that discussion.
[12:43]
But the farmland preservation plan and
[12:45]
the outcomes from there, Charlie's on
[12:47]
that also should give us a very strong
[12:50]
framework to work from as we consider
[12:53]
topics and issues to bring forward for
[12:55]
the discussion on egg.
[12:58]
>> So as I understand that then both Lisa's
[13:00]
» So as I understand that then both Lisa's
[13:00]
pre-work and the farmland preservation
[13:03]
pre-work all feeds into being available
[13:06]
information for the um the egg section
[13:08]
of the comp plan.
[13:10]
>> That is the hope. That's what we've been
[13:12]
» That is the hope. That's what we've been
[13:12]
working towards.
[13:13]
>> Yeah.
[13:13]
» Yeah.
[13:14]
>> So, I'd like to if Emily, if you're
[13:15]
» So, I'd like to if Emily, if you're
[13:15]
online, do you have an observation with
[13:17]
that regard?
[13:23]
» I'm not.
[13:23]
>> Yeah. Can you hear me everyone?
[13:25]
» Yeah. Can you hear me everyone?
[13:25]
>> I can hear you now.
[13:27]
» I can hear you now.
[13:27]
So they're two distinct but closely
[13:30]
related planning documents
[13:34]
and the farmland preservation
[13:38]
even has follows the same adoption
[13:42]
procedures that the comprehensive plan
[13:44]
does so that they can be fully um
[13:47]
coordinated and integrated with each
[13:49]
other.
[13:51]
So comprehensive plan would be talk
[13:53]
thinking about broadland use guidance
[13:55]
and then the farmland preservation plan
[13:57]
focused on
[13:59]
eggland protection.
[14:05]
» Okay.
[14:07]
>> Thank you. Um Pat,
[14:10]
» Thank you. Um Pat,
[14:10]
>> I have a question.
[14:12]
» I have a question.
[14:12]
>> Go ahead, Liz.
[14:15]
» Go ahead, Liz.
[14:15]
in the plan. Can we have data um like if
[14:21]
there's any existing small dairy farms
[14:25]
in the area and how do they see their uh
[14:30]
future in the farming community and how
[14:34]
are they staying small as opposed to
[14:38]
growing?
[14:41]
Yeah,
[14:42]
>> the farmland preservation plan has in
[14:46]
» the farmland preservation plan has in
[14:46]
the current draft version and the
[14:48]
updated version will have information on
[14:51]
all the different types of farming and
[14:53]
sizes. And they've got information on
[14:55]
the number of headed cattle, dairy and
[14:56]
beef. So that's all in there. And then
[14:59]
those issues and concerns related to,
[15:01]
you know, egg in general, but also dairy
[15:03]
farms. And we've talked about smallcale
[15:06]
farming and smaller ones um at um
[15:09]
extensively also. And Emily, you made a
[15:12]
comment about, you know, the two plans.
[15:14]
Um, forget the exact phrase you
[15:16]
mentioned, but it's important that
[15:18]
there's consistency in there when we're
[15:20]
done so that one plan doesn't say one
[15:23]
thing and the other one's at odds with
[15:25]
it.
[15:28]
Any other discussion on the egg?
[15:30]
>> Thank you.
[15:31]
» Thank you.
[15:31]
>> Section. Then we move on to
[15:33]
» Section. Then we move on to
[15:33]
transportation. So that's my element. I
[15:36]
have asked Paul Wilharm to join me in
[15:39]
that effort on uh transportation
[15:42]
utilities particularly in sense that
[15:44]
Mandal Island has uh unique
[15:46]
transportation issues and that there are
[15:49]
issues around the future of
[15:50]
transportation on the water in Bay and
[15:53]
around the Basel Islands. And I think
[15:55]
Paul you also have some background on uh
[15:57]
with regard to airports. Is that
[15:58]
correct?
[16:02]
Maybe you could uh give us a little bit
[16:03]
of your what you might bring as insights
[16:06]
from your background for transportation.
[16:10]
>> Uh well, as far as aviation goes, uh
[16:13]
» Uh well, as far as aviation goes, uh
[16:14]
just like uh the electric cars that are
[16:16]
coming, uh you know, there's going to be
[16:18]
electric aircraft.
[16:21]
Uh there's already
[16:23]
uh one V tall single person aircraft you
[16:27]
can buy for $100,000 that has 20
[16:30]
minutes. So you'd be able to take off
[16:33]
and you know whip over to to Bayfield
[16:36]
from from the island. Uh and there's
[16:39]
more of this coming.
[16:43]
» Uh thank you. I just note that I I I saw
[16:45]
an article this week on small uh
[16:47]
hydrooil electric fairies because
[16:49]
they're hydrooil. They are much more
[16:50]
efficient and carry much smaller battery
[16:52]
and fry around, you know, between 10 and
[16:55]
20 people might be ideal for Schwaming
[16:57]
Bay in the future. So there a lot of
[16:58]
things could change in the next 20 years
[17:00]
technologically with regard to utilities
[17:02]
and transportation and uh that's where
[17:05]
we'll be be looking. So next is housing
[17:08]
and that's Brad's element but he's not
[17:10]
here. So Gary, you have uh land use and
[17:13]
economic development. Where do we stand
[17:15]
with that?
[17:16]
>> Yeah, I just a more of a comment than in
[17:20]
» Yeah, I just a more of a comment than in
[17:20]
depth because there's more background to
[17:22]
find out. But in our last plan on
[17:25]
economic development, it said we would
[17:27]
develop and maintain a strong economy,
[17:30]
supports residents and the community
[17:32]
with services and so on.
[17:36]
down below it talks about the fastest
[17:37]
growing industry 10 years ago or so was
[17:40]
in Ashen County was tourism.
[17:43]
Um
[17:45]
that will have to define where we're
[17:46]
really going now. Is tourism our fastest
[17:49]
growing industry
[17:51]
and then how do we maintain a strong
[17:55]
economy for the residents if that's it.
[17:58]
Um so that's just a a thought that I
[18:01]
had. The other one that I um in land use
[18:05]
projections
[18:06]
back in the last plan it said based on
[18:09]
the growth in the county um more than
[18:14]
85% of the growth will occur in
[18:15]
unincorporated areas of the county. And
[18:18]
I'd like to look at that sometime a
[18:20]
little deeper because what I'm seeing in
[18:21]
the southern part of the county is every
[18:24]
home that's up for sale, there's a 50%
[18:28]
chance that those homes are being bought
[18:30]
up by somebody from outside the county
[18:32]
who does not live here. Um I can take
[18:36]
you down roads here where 10 homes and
[18:39]
nine of them are not lived in year
[18:42]
round. we wonder why we have a housing
[18:44]
shortage or uh employers say, "Hey, we
[18:46]
need employees employees need housing."
[18:50]
So that's a just a short look at it, but
[18:53]
that's something we're going to have to
[18:55]
be concerned about is uh if we want
[18:57]
development and we want people, are we
[19:01]
going for tourism, which I'm not saying
[19:03]
we aren't, but how do we maintain who we
[19:06]
have here and support schools,
[19:09]
industries, and things if most of our
[19:12]
housing is being bought up by somebody
[19:14]
that doesn't live here year round? So,
[19:17]
like I say, there's a lot more to that
[19:20]
down the road to come, but those are
[19:21]
just some of the points I see that we
[19:24]
need to discuss.
[19:28]
Any uh observations or comments on uh
[19:31]
the economic development element?
[19:34]
Um
[19:36]
see, I think we pretty much covered the
[19:37]
bases. We do have a risk and
[19:40]
opportunities element, but we're
[19:41]
probably a little bit too soon to be
[19:42]
getting to that. And then there'll be an
[19:44]
implementation element. We're probably a
[19:46]
little bit early on the um calendar for
[19:48]
that as well. So, if there's no
[19:50]
objection, I think I'll move on to the
[19:52]
next uh agenda item, which is um let's
[19:56]
stand or reconsider or amend a
[19:57]
previously approved public participation
[19:59]
plan. So,
[20:02]
at our last meeting, we approved a
[20:03]
public participation plan uh with the
[20:06]
understanding that anybody who voted in
[20:08]
favor could bring a motion to reconsider
[20:12]
and if there was a second and a vote in
[20:13]
favor of reconsidering could be
[20:15]
reconsidered. Now, this is on the public
[20:18]
on the county board agenda for approval
[20:21]
tomorrow.
[20:23]
So to rewrite it, it'd be tricky. But if
[20:28]
we really wanted to, we could amend it
[20:32]
and then the amendment would be an
[20:34]
add-on to what's being approved by the
[20:36]
county board tomorrow hopefully because
[20:38]
we need it to be approval to be
[20:40]
completed.
[20:41]
My personal preference would be let it
[20:44]
stand and if we need to amend it at a
[20:46]
future date, we could do so. But open
[20:49]
for discussion.
[20:51]
Anybody?
[20:54]
>> Sean,
[20:54]
» Sean,
[20:54]
>> I guess I I'm I'm in the process of
[20:57]
» I guess I I'm I'm in the process of
[20:57]
outlining and then attempting to flesh
[20:59]
out two additional elements. Um,
[21:02]
community health and sustainability.
[21:05]
And I just want to make sure this would
[21:07]
allow to have those entered if we if
[21:10]
after review of these sections, this
[21:12]
body felt them appropriate. And and I
[21:16]
know that it's got some specific
[21:17]
elements listed. Does it would that be
[21:19]
exclusionary to any additional ones or
[21:21]
not?
[21:23]
>> Uh, no. I don't think my interpretation
[21:25]
» Uh, no. I don't think my interpretation
[21:25]
would be no exclusion, but I think that
[21:27]
falls into the discussion about scope of
[21:29]
work.
[21:30]
>> Okay?
[21:31]
» Okay?
[21:31]
>> Because this is this is about how we
[21:33]
» Because this is this is about how we
[21:33]
engage the public to be able to comment
[21:35]
and participate,
[21:36]
>> right?
[21:36]
» right?
[21:36]
>> And if we add work to the process, they
[21:39]
» And if we add work to the process, they
[21:39]
can easily participate and comment on
[21:41]
that as well. But this is what we know
[21:43]
as our baseline because we haven't added
[21:45]
any elements as of this point in time.
[21:48]
Mary Erica,
[21:51]
>> just one thing that I wanted to um point
[21:54]
» just one thing that I wanted to um point
[21:54]
out here and is in the email that I sent
[21:58]
all of you with notes is that there's a
[22:01]
lot that is in here that is sort of
[22:04]
extra that I assume we will never use
[22:07]
and I feel like it would be a clearer
[22:09]
document if we cut some of it. Um
[22:14]
there are also like there's there are no
[22:18]
activities assigned to any single person
[22:21]
or to any group. And so this is
[22:25]
something I would really like to have
[22:26]
some kind of open conversation with. I
[22:28]
would think in a meeting with at least
[22:30]
Lisa and probably all of us because
[22:34]
these are big things. Um
[22:38]
so like as just a general document sure
[22:41]
it's fine but there's like there's also
[22:43]
still inconsistent language across
[22:46]
documents. So one the scope of work
[22:49]
calls something a digital public survey
[22:52]
whereas we just call it a survey and it
[22:56]
doesn't tell the mechanism. It doesn't
[22:59]
sort of say anything. So there's just
[23:00]
there's a lot of like different terms
[23:02]
used across the two documents and yet
[23:04]
there's they're referring to each other
[23:06]
sort of constantly. So that that was the
[23:09]
those were the things I was trying to
[23:10]
point out. I'm not trying to halt this.
[23:14]
In fact, you know, we we need to get it
[23:16]
done. Um but
[23:20]
just wanted to offer that up.
[23:23]
Other comments I'd like to ask uh Emily
[23:26]
you're there or Autumn about the digital
[23:30]
public survey. Is that a capacity that's
[23:32]
offered by Northwest Regional Planning?
[23:35]
Yeah, within the
[23:38]
uh current cost the 75,000
[23:41]
would be the opportunity to do a digital
[23:45]
survey with Northwest Regional Planning
[23:48]
assisting the committee with developing
[23:49]
questions
[23:51]
um creating usually we create a QR code
[23:55]
and then it would be the county or
[23:57]
committee's responsibility to
[24:00]
um distribute the survey information
[24:04]
whether that's social media, newspapers
[24:07]
on county website to get that
[24:09]
information about the survey opportunity
[24:11]
out to the public. And then once those
[24:15]
um surveys are completed, Northwest
[24:19]
Regional Planning would do a summary
[24:22]
report of all of the um answers within
[24:28]
the survey and that would be within the
[24:30]
current constructs of the cost.
[24:35]
>> Uh thank you. Other comment on a
[24:37]
» Uh thank you. Other comment on a
[24:37]
question, Pat? Well, what Erica said, I
[24:41]
I've got some of the same questions,
[24:43]
thoughts, concerns. One is it seems
[24:46]
ambitious, which is fine, but then the
[24:49]
question of who's going to do what and
[24:50]
when, and that isn't in there. So, for
[24:54]
example, I've got the egg section, but
[24:56]
I've had three meetings with Alyssa.
[24:57]
We're going to have a good nine or more
[24:59]
with farmland preservation, and that's
[25:01]
all outside of whatever the comp plan
[25:03]
says we're going to do. Then I have the
[25:05]
forestry. So, I'm thinking about all
[25:08]
these meetings just for the comp plan
[25:10]
update in those sections, let alone
[25:12]
everything else. Um, it's not clear to
[25:14]
me what I have to do, when I'm going to
[25:19]
have to do it, where I'm going to have
[25:21]
to do it. And that's partly penciling
[25:23]
in, you know, this update around
[25:26]
everything else in life. And then I, you
[25:29]
know, I've mentioned this before, next
[25:31]
April, there's an election and the comp
[25:34]
plan doesn't need to be done until the
[25:36]
end of 2026.
[25:38]
All things being equal, it' be a nice if
[25:40]
the group of us that are active now, you
[25:42]
know, largely have it what we need to do
[25:45]
done by April. But if we don't, it
[25:48]
should be really clear to whoever picks
[25:49]
it up, if anybody's not here after
[25:51]
April, that they know what they would be
[25:54]
getting into if they take it on. So
[25:57]
there's there's no clarity on that yet.
[26:00]
I'd like to get to it when we get a
[26:02]
chance. Other other discussion, Erica,
[26:06]
>> just to make things really clear. So in
[26:09]
» just to make things really clear. So in
[26:10]
the public participation plan, there's
[26:12]
something called summaries.
[26:14]
Whereas in the public participation
[26:16]
plan, there's the word summaries being
[26:20]
used, summaries of meetings that are
[26:23]
transcribed. I believe in in Ashlin
[26:25]
County we call those minutes. So I mean
[26:28]
some of these things are really easy to
[26:29]
change just to make them consistent so
[26:31]
that we're referring to actual documents
[26:34]
that are recorded um that we don't so we
[26:37]
don't need to do additional summaries,
[26:39]
right? Um, also listed under its own um,
[26:44]
bolded subheading is community display
[26:48]
and exhibit. That is separate from our
[26:51]
open house, our all of our other
[26:54]
meetings, sort of everything else. At
[26:56]
least to my knowledge, we haven't talked
[26:58]
about a community display and exhibit. I
[27:01]
don't know if Lisa is thinking about an
[27:03]
extra community display and exhibit. And
[27:06]
if we're not, why don't we just delete
[27:08]
that part? like if we're not going to do
[27:09]
it, if nobody's going to pick that up,
[27:11]
wouldn't that just be a super easy fix?
[27:14]
Um
[27:17]
there's also, let's see, an email
[27:21]
mailing list that someone should be
[27:25]
overseeing, collecting emails, and then
[27:30]
sending out updates to things. Do we
[27:32]
have anyone in mind for who's going to
[27:34]
do that? Uh if not, I think we could
[27:37]
take that out too. Um I think if it's
[27:40]
more the subcommittees are creating
[27:42]
their own sort of groups of people, then
[27:45]
maybe that doesn't need to be in here.
[27:47]
And then there's also a newsletter.
[27:51]
Someone is going to create a newsletter
[27:54]
uh periodically and pass that out. Um,
[27:59]
there's also quite a few things listed
[28:01]
here that need to be on the website that
[28:03]
are not on the website yet. So, like a
[28:06]
lot of it is not I I don't feel like
[28:09]
it's sort of debatable. Like I don't I
[28:11]
don't know like if we're not intending
[28:13]
to do it, it would be it would be a more
[28:15]
concise document. It would be easier to
[28:17]
read and things would actually reference
[28:20]
across multiple documents.
[28:24]
Lisa,
[28:27]
>> thank you. Um, yeah, I know when we were
[28:30]
» thank you. Um, yeah, I know when we were
[28:30]
when Erica and I met and we talked about
[28:33]
this, it was almost like we should not
[28:36]
um quote pass this yet until we met in
[28:41]
August with regional planning to find
[28:43]
out like what exactly they're doing and
[28:47]
what we were doing. So, thanks for
[28:49]
mentioning my name a hundred times, but
[28:51]
I don't have the capacity to do that in
[28:53]
the next year. you know, I can do a few
[28:55]
things. Um, but I can't be the keeper of
[28:58]
the outreach for the county's plan. Um,
[29:01]
I'm not sure what is in the um contract.
[29:06]
You know, um, Emily mentioned maybe
[29:08]
$20,000 for a survey. I don't know if
[29:11]
that's already in the scope of work as a
[29:13]
contract item or if that's an additional
[29:16]
thing. So it seemed like before we
[29:19]
passed this and you could pass this and
[29:22]
say this is our first attempt but it's
[29:24]
an organic process and we know things
[29:26]
will change and then go back to the
[29:28]
board and say we want to do some changes
[29:30]
or I think we're meeting with regional
[29:32]
planning in August for the first time
[29:35]
you know get more information then about
[29:37]
what is theirs and then what is our real
[29:41]
goal our real are we going the Cadillac
[29:45]
template outreach That's this or are we
[29:48]
doing the Chevy or the bicycle
[29:52]
and then figure out who could do what
[29:55]
>> or the electric airplane ready to go?
[29:59]
» or the electric airplane ready to go?
[29:59]
>> I would just are do
[30:02]
» I would just are do
[30:02]
are you both kind of suggesting that
[30:05]
this might be a little premature
[30:07]
approving this till until we meet in
[30:09]
August and if so is there any rush
[30:11]
George that we couldn't take this off
[30:14]
the agenda for this month? It's my
[30:16]
understanding we're required to have it
[30:17]
now when the contract goes into place.
[30:19]
The contract has not yet been put in
[30:21]
place. The next thing on the agenda is
[30:23]
to talk about the scope of work. Uh
[30:25]
point out to of the things that I find
[30:27]
in this the state law says, you know,
[30:30]
shall adopt written procedures designed
[30:33]
to foster public participation. That's
[30:35]
the requirement. She'll adopt written
[30:36]
procedures designed to foster written
[30:38]
participation.
[30:41]
There'll be open discussion,
[30:42]
communication programs, information
[30:44]
services, public meetings, and with
[30:46]
advanced notice and opportunity for
[30:49]
written comments. That's all that's
[30:50]
required.
[30:52]
So, I see this as documentation
[30:56]
of a smorgus board of options for the
[30:59]
committee and future committee if it's
[31:01]
different than us next year to be
[31:03]
working with. And if we leave things
[31:05]
out, they won't be there on this
[31:07]
mortgage board table for people to
[31:08]
choose from. I'll point out that most of
[31:10]
these are open house and openhouse.
[31:14]
Okay, one open house is actually
[31:16]
required by law. But when you come to
[31:18]
some of these other items, it's
[31:22]
uh see where
[31:25]
it's a may. So, community play may be
[31:30]
used. Doesn't say it will be used. It
[31:32]
says it may be used. Is there as an
[31:34]
option?
[31:36]
um a newsletter may be prepared. So, I
[31:39]
see no point in deleting these items
[31:41]
because they're reminders of something
[31:43]
that we could do and we might decide to
[31:44]
do later in the process. Um the last
[31:49]
thing I'll say is that um personally I
[31:52]
support leaving this alone and letting
[31:53]
the county board approve it tomorrow,
[31:55]
but it's up to the committee. Um, this
[31:58]
has already been approved. So, would
[32:01]
take a a motion and a vote to reconsider
[32:04]
and to open reopen discussion and then
[32:07]
revise it at this meeting or at a future
[32:10]
meeting. But, if we delay to the future
[32:12]
meeting, then it won't be in place for
[32:14]
the satisfaction of the contract and the
[32:16]
grant requirements. So, it's um it's up
[32:20]
to the committee. But, uh, Charlie, you
[32:22]
have the floor.
[32:23]
>> That Thank you. That clarifies things
[32:26]
» That Thank you. That clarifies things
[32:26]
for me. Um, and I support approving this
[32:29]
now. Um, and then I suspect when we meet
[32:33]
in August, then we'll be able to decide
[32:35]
which of these options are our best ones
[32:37]
to use should we choose. I'm glad
[32:40]
they're not mandatory. You said there
[32:42]
was three mandatory things, I think. So,
[32:44]
thank you.
[32:45]
>> Just want to point out there's there's
[32:47]
» Just want to point out there's there's
[32:47]
nothing to be done now if nobody brings
[32:50]
a motion to reconsider. was just
[32:52]
discussion and we move on because it's
[32:54]
already been an approved document and
[32:57]
it's already on the agenda for the
[32:58]
county board for tomorrow. But we do
[32:59]
have the option of bringing it up for
[33:01]
reconsideration if someone wants to do
[33:03]
so.
[33:04]
>> Right. Pat.
[33:06]
» Right. Pat.
[33:06]
>> So at the board meeting tomorrow, if the
[33:08]
» So at the board meeting tomorrow, if the
[33:08]
board as a whole wants to modify this
[33:10]
document and approve the modified
[33:12]
version, I would assume that that is
[33:15]
then the document that this committee
[33:17]
would be working with.
[33:18]
>> Yes. Totally within their empowerment.
[33:20]
» Yes. Totally within their empowerment.
[33:20]
Yeah. So if Erica and Lisa
[33:27]
had one or more things that they say,
[33:29]
you know, this really really should be
[33:31]
changed and they sent it to the board
[33:34]
prior to the meeting tomorrow, the board
[33:36]
consider could consider making the
[33:38]
changes in. Some of it's just language
[33:40]
for consistency of language so it's
[33:43]
clear that it's the same thing and not
[33:45]
different things.
[33:47]
Um, you know, but it's a long list of
[33:50]
stuff to do and then, you know,
[33:52]
ultimately you got to rouse it with
[33:53]
who's going to do it. And I've heard
[33:54]
multiple people say, "I'm busy enough.
[33:57]
Don't put that on my plate." And I know
[34:00]
how busy my plate is just with the comp
[34:03]
plan stuff, let alone everything else.
[34:06]
So,
[34:09]
and then we talk about how often does
[34:11]
anybody look at the comp plan. You know,
[34:13]
we hear those comments all the time. And
[34:14]
for those of us on the board, we know
[34:16]
how often the comp plan is referred to,
[34:19]
like not often, you know, it's rarely
[34:22]
referred to. So, in many ways, if we had
[34:25]
a shorter, more focused list, I I think
[34:29]
being realistic,
[34:31]
that would be helpful. But I think it
[34:33]
would be good to get input. I mean, just
[34:34]
in terms of process, because you don't
[34:36]
want to modify this today and then amend
[34:37]
the agenda with here's a new one. Not
[34:39]
that we couldn't. We certainly could,
[34:41]
but we could also agree on a list of
[34:43]
changes today and then if someone on
[34:45]
this committee that's on the board then
[34:47]
wants to make that motion tomorrow and
[34:49]
and bring it forward, the board could
[34:51]
consider that as a whole.
[34:54]
>> Further discussion,
[34:56]
» Further discussion,
[34:56]
>> Lissa? I mean, one of the amendments
[34:58]
» Lissa? I mean, one of the amendments
[34:58]
could be that um a sentence or so near
[35:02]
the beginning that says these are proven
[35:06]
successful outreach strategies that can
[35:09]
help reach more people, blah blah blah.
[35:12]
Um
[35:15]
we will work on them or accomplish them
[35:17]
as staff and resources are available.
[35:22]
I mean, I don't I just don't want
[35:23]
somebody in the public to get a hold of
[35:25]
the public participation plan and say,
[35:29]
"You didn't do an email list and you
[35:32]
didn't do a display or I didn't hear
[35:34]
anything about it. What's your plan?"
[35:36]
And then you say, "Well, here's our
[35:38]
plan." And they say, "Well, who's doing
[35:39]
your website?" And we said, "Well, we
[35:41]
don't know. That was just our idea.
[35:43]
We'll figure that out." I just don't
[35:45]
want to have create that vulnerability
[35:48]
of setting up because this is a this is
[35:50]
a Cadillac plan. I mean, it doesn't have
[35:52]
social media on it, but I was going to
[35:54]
do that anyway just because I do social
[35:56]
media, but I'd hate for it to be like
[36:01]
here's how we intend to engage people,
[36:04]
but then we come back, somebody says,
[36:06]
well, you didn't talk to seniors. and we
[36:08]
come back and say, "Well, these were
[36:10]
maze or maybe if we had a person." So,
[36:15]
if we added a disclaimer,
[36:18]
maybe it's a little bit of a bumper
[36:21]
as an amendment because you did ask us
[36:23]
if we had things that we wanted to be
[36:25]
reconsidered or amended. Does that make
[36:27]
sense? What do you think? What if
[36:29]
somebody came to you and said, "I saw
[36:30]
your public participation plan. Where's
[36:32]
this newsletter?" And you know,
[36:35]
>> I'd ask them if they didn't know what
[36:36]
» I'd ask them if they didn't know what
[36:36]
the word may meant. I mean, we still
[36:39]
have to decide of of what those we're
[36:41]
going to use. And I think that's so we
[36:44]
leave those options there and then in
[36:46]
August we we rewrite it and say these
[36:49]
are the ones we're going to use. And
[36:51]
then if they don't find those, they have
[36:53]
a beef with us. But if they don't find
[36:56]
us using something that we said we might
[36:58]
use but didn't, then they don't have
[37:00]
really a grounds for a complaint. But I
[37:02]
see where that could possibly happen,
[37:05]
but I think that going to jam us up more
[37:07]
than it would help us at this phase.
[37:10]
>> Can is there um would you have a issue
[37:12]
» Can is there um would you have a issue
[37:12]
with adding some language that says
[37:16]
this is our first great plan depending
[37:19]
on resources and staffing. I
[37:23]
>> I look at this now that we're looking at
[37:25]
» I look at this now that we're looking at
[37:25]
this Cadillac option plan to determine
[37:28]
what part of it we want to use. Can we
[37:30]
decide that today?
[37:33]
>> Uh, not my daily wick, but if George
[37:35]
» Uh, not my daily wick, but if George
[37:35]
says we can, is it adopted?
[37:38]
>> Yeah, let me let me chime in here. Um, I
[37:41]
» Yeah, let me let me chime in here. Um, I
[37:41]
think it' be more expeditious for us to
[37:44]
amend this at a future meeting if we
[37:47]
wish to. There's nothing says that we
[37:49]
have to do all these things. I view this
[37:51]
more as a checklist and a a keeping us
[37:57]
on plan. sort of a checklist of things
[37:58]
we can and will be doing during the
[38:01]
course of the year. We might do some and
[38:02]
we might not do others. So just because
[38:05]
it's a plan doesn't mean that
[38:08]
everything's going to be done as long as
[38:09]
we meet the legal requirement
[38:12]
which is pretty open. The legal
[38:15]
requirement is just to have some public
[38:17]
participation and open discussion and
[38:19]
communication programs. It doesn't it
[38:23]
doesn't say that we have to do all these
[38:24]
things. So if we don't do them, we're
[38:26]
not in any kind of detriment. We just
[38:30]
But we m we've got our ideas down on
[38:32]
paper of things that we should can be
[38:34]
doing and we have a timeline which is
[38:37]
maybe tells us whether we're behind or
[38:39]
ahead of schedule. So I see personally I
[38:43]
see no problem with this.
[38:45]
>> Yeah. So, we get to August, which isn't
[38:47]
» Yeah. So, we get to August, which isn't
[38:47]
very far away, and we we need to pencil
[38:50]
in who's doing what and when, you know,
[38:54]
for each of the components of the comp
[38:55]
plan, but also all of these other issues
[38:57]
that we're talking about, when we get to
[38:59]
August,
[39:01]
could we at least have an understanding
[39:03]
that some of these items, the email
[39:05]
list, the website, etc., if we don't
[39:07]
have a volunteer or someone penciled in
[39:10]
that we reduce that list and update this
[39:12]
document because if we hit August, which
[39:15]
is when we're supposed to hit the ground
[39:16]
running on updating the comp plan, if we
[39:19]
don't have people penciled in, then we
[39:22]
should shorten that list in this
[39:23]
documents. I agree with what Lisa said.
[39:26]
I've read things like that and you know,
[39:28]
it creates the impression that there's
[39:30]
going to be a bunch of stuff going on.
[39:31]
And yes, the word may is in there, but
[39:34]
you know, you can only not do so many
[39:36]
things that you say we may do this, we
[39:38]
may do that without leaving a sour taste
[39:41]
with the public. I would rather have a
[39:43]
shorter list that we're committed to and
[39:44]
have the people and the resources to do
[39:47]
and then do that, you know, pencil it in
[39:49]
and be committed to that. But we had
[39:51]
August. We need to pencil names and
[39:54]
dates and commitments in. So, I'm okay
[39:56]
with leaving it to August, but if we
[39:58]
don't have names in August, then I think
[40:01]
We have no choice but to shorten the
[40:03]
list.
[40:04]
>> I guess I see we got to we can't really
[40:08]
» I guess I see we got to we can't really
[40:08]
make those are good things to keep in
[40:09]
the back of their head till we actually
[40:11]
have the meeting with NWRPC.
[40:14]
That's what we're waiting on, right? See
[40:16]
what exactly the the disposition of
[40:18]
duties is going to be. So to try to
[40:20]
pencil stuff in now,
[40:23]
it might not be just go out the window
[40:26]
when we actually have the the meetings.
[40:29]
So Well, is Emily on the call right now?
[40:33]
>> Emily, you want to chime in?
[40:40]
» Emily will be coming back in just a
[40:43]
second here. She'll be able to hop on
[40:45]
and give some answers. But um I guess
[40:51]
our situation that we're in right now is
[40:54]
we're not technically under contract um
[40:58]
yet to be coming to like attending
[41:02]
meetings in person and things like that.
[41:05]
We don't have a contract set in stone
[41:07]
right now. Um so that would be something
[41:10]
that we could talk about once that scope
[41:13]
of work gets approved and um the
[41:15]
contract is approved. Um public
[41:17]
participation plans are important to
[41:20]
have that prior to doing any work on a
[41:24]
comp plan. Um it is statutoily required
[41:28]
before um any work to a comp plan is
[41:32]
done that that public participation plan
[41:34]
is approved. So that would kind of be
[41:37]
your first step on anything would be to
[41:40]
get the public participation plan nailed
[41:42]
down and approved by the county board.
[41:46]
>> Thank you.
[41:49]
» And I am back now. This is Emily.
[41:52]
>> Go ahead, Emily.
[41:53]
» Go ahead, Emily.
[41:53]
>> So we would have um just a ma like a
[41:57]
» So we would have um just a ma like a
[41:57]
general outline. Northwest Regional
[42:00]
Planning's responsibilities
[42:02]
would be to make sure that all of the
[42:05]
statutory requirements are met for the
[42:07]
comp plan update. So that would include
[42:09]
the adoption of the public participation
[42:11]
plan by the county board before we start
[42:14]
any sort of planning committee meetings
[42:16]
that are facilitated.
[42:18]
We'd also make sure that the draft plan
[42:21]
is properly distributed
[42:23]
to all of the required entities. So that
[42:26]
would be neighboring jurisdictions
[42:29]
and then we help prepare the materials,
[42:31]
the draft plan for county board
[42:34]
adoption. We'll be the ones responsible
[42:37]
for updating the tables, charts, maps,
[42:40]
any narrative content that's affected by
[42:44]
any new data. We would draft updated
[42:46]
narrative content and revise the plan
[42:49]
chapters for review by this committee.
[42:52]
And then for actual facilitated
[42:55]
meetings, the current scope of work
[42:58]
includes eight meetings of this
[43:00]
committee as well as one facilitated
[43:02]
public open house. So that's different
[43:05]
than the required public hearing that's
[43:07]
a part of statute. The open house would
[43:09]
be on the preliminary draft
[43:11]
comprehensive plan before it moves into
[43:14]
the formal um adoption process to get
[43:17]
some input from the public on a
[43:18]
preliminary draft.
[43:22]
And then we would also provide digital
[43:23]
copies of the draft and final plan in
[43:26]
both Microsoft Word and PDF formats. We
[43:29]
do the the mapping and develop the
[43:32]
updated existing land use and the future
[43:35]
land use maps.
[43:37]
We would support the county in the
[43:39]
preparation of the public hearing.
[43:42]
That's the statutory requirement that is
[43:44]
the with the 30-day notice of the final
[43:47]
draft plan. And we would also assist
[43:49]
with the uh information you need for
[43:52]
plan final plan adoption by the county
[43:54]
board.
[43:56]
And then the current scope of work also
[43:59]
includes the assistance with a digital
[44:01]
public opinion survey. And then we would
[44:03]
have the summary analysis for that as
[44:07]
well as um any hardcolor copy printing
[44:11]
of the final plan that the county might
[44:13]
want to have that would be at an
[44:15]
additional cost. So for Russ County, for
[44:18]
this planning committee, the main things
[44:20]
would be to review and provide timely
[44:22]
feedback on all the draft materials that
[44:25]
we provide
[44:28]
that the county board adopts the public
[44:30]
participation plan according to
[44:33]
comprehensive planning law requirements.
[44:36]
You would be the responsible for
[44:37]
conducting and coordinating any of the
[44:40]
additional public outreach engagement
[44:42]
activities. So that sounds like what
[44:43]
you're talking about right now within
[44:44]
this public participation plan that's
[44:47]
above and beyond the statutory
[44:48]
requirements. And this public
[44:50]
participation plan is um based on one
[44:53]
that another county that we worked with
[44:56]
um did. So these are things like that
[45:00]
another county um had as their
[45:03]
priorities and maybe those priorities
[45:05]
are different in Ashlin County. So, I
[45:07]
heard you talking about the community
[45:09]
display, and what that county did was
[45:12]
had a display with some of the
[45:16]
survey results as well as some of the
[45:19]
background information, population, and
[45:21]
housing data, and they had that
[45:23]
displayed at the entrance to their
[45:26]
government center.
[45:30]
And then we'd also assist with uh
[45:33]
organizing the public hearing for plan
[45:35]
adoption as well as approval of the
[45:37]
final plan and related ordinance with
[45:40]
the county board. And I see one hand up.
[45:44]
>> Yeah, this Emily and Autumn, this is
[45:46]
» Yeah, this Emily and Autumn, this is
[45:46]
Gary Merdict. I have a question. You uh
[45:49]
Autumn, I think you said you didn't have
[45:50]
the contract. I got an email over 10
[45:54]
days ago saying that that contract had
[45:56]
been approved. Is it something that
[45:59]
>> you haven't uh
[46:00]
» you haven't uh
[46:00]
>> the contract with for the grant has been
[46:04]
» the contract with for the grant has been
[46:04]
approved? So the state and the county.
[46:07]
>> Okay.
[46:08]
» Okay.
[46:08]
>> So now that that has been approved, we
[46:10]
» So now that that has been approved, we
[46:10]
can and I today you also have
[46:14]
>> um the scope of work on your agenda at
[46:17]
» um the scope of work on your agenda at
[46:17]
the this committee level. Then we can
[46:20]
look at the contract between Northwest
[46:23]
Regional Planning and the county for
[46:25]
this plan update.
[46:27]
>> Okay. Thank you.
[46:28]
» Okay. Thank you.
[46:28]
>> Contract was specific to the grant.
[46:30]
» Contract was specific to the grant.
[46:30]
>> Okay. Thank you very much.
[46:32]
» Okay. Thank you very much.
[46:32]
>> Yes.
[46:34]
» Yes.
[46:34]
>> Any further discussion? Uh see Eric, did
[46:38]
» Any further discussion? Uh see Eric, did
[46:38]
you have Okay, Charlie, go ahead.
[46:40]
>> Okay. Sorry. I I don't want staff to
[46:43]
» Okay. Sorry. I I don't want staff to
[46:43]
think that I don't support them 100%.
[46:46]
Perhaps a a uh
[46:50]
an amendment stating
[46:52]
uh that the uh points in this plan are
[46:56]
subject to change uh may may change
[47:00]
based on the August meeting.
[47:04]
Would would something like that give you
[47:06]
comfort?
[47:07]
>> Other discussion, Lisa?
[47:09]
» Other discussion, Lisa?
[47:09]
>> Something like that gives me more
[47:10]
» Something like that gives me more
[47:10]
comfort because it reduces expectation
[47:13]
levels. Um maybe there should be a
[47:16]
statement in the beginning that says
[47:18]
this is what's required by the statute.
[47:20]
What follows is a checklist of ideas
[47:23]
that we may pursue. Make sure everyone
[47:26]
in the county gets the news as staff and
[47:28]
resources allow
[47:31]
because there's a difference to me
[47:33]
between like a wish list and an action
[47:35]
plan. you know, an action plan. I am
[47:38]
saying I'm doing this and then um
[47:41]
whether that's a Chevy or a Cadillac
[47:43]
plan, maybe it's two things, maybe it's
[47:45]
20 things, but it's a plan of action
[47:47]
that I'm going to do a a guideline or a
[47:51]
checklist to me is is a little bit
[47:53]
different. Whereas the idea that we're
[47:55]
calling this participation plan to me
[47:57]
sets up expectations and I'm not sure
[48:00]
that a lot of people will read it at
[48:02]
all. Um but the word and and whether
[48:06]
they zone in on the word may
[48:10]
um you know that's a separate question
[48:12]
but if if we're clear about what the
[48:14]
expectation is to do this work or just
[48:17]
say these are our great suggestions.
[48:19]
We're going to try and get to it. You
[48:21]
know nice statement like that. This is
[48:24]
what's required that will get done.
[48:26]
We've hired a contractor to help us. If
[48:28]
I may, uh, if you look at the second
[48:31]
page of the public participation plan,
[48:34]
uh, paragraph two, it says, um, we'll
[48:37]
use due diligence to ensure the spirit
[48:40]
and intent of this public participation
[48:42]
plan is upheld. The spirit and intent.
[48:46]
However, it should be expected that
[48:48]
deviations from this plan may be
[48:49]
warranted. It's right in there.
[48:52]
>> Okay. I didn't read that part. Did you
[48:54]
» Okay. I didn't read that part. Did you
[48:54]
do you agree with that then, Charlie?
[48:56]
I'm
[48:56]
>> because that's what you're getting at as
[48:58]
» because that's what you're getting at as
[48:58]
well, right?
[48:59]
>> Yeah. I I think we're all getting a
[49:02]
» Yeah. I I think we're all getting a
[49:02]
little wrapped up with what may or may
[49:05]
not be a final and that's not going to
[49:07]
happen till we meet with NWRPC. Then
[49:09]
then then
[49:11]
we got to make sure that we're dotting
[49:13]
and crossing
[49:15]
te's and eyes that we can do before we
[49:18]
say yes. So these are all just may now
[49:20]
in preparation for that meeting. And so
[49:23]
I'm comfortable with it the way it is.
[49:27]
So if I go to page two of the document,
[49:32]
it's there's a section called public
[49:34]
participation plan by method and then
[49:38]
there's a paragraph or two, then there's
[49:40]
a bunch of bullets, but then when you
[49:43]
get to page three of the document, now
[49:47]
it starts with community
[49:48]
display/exhibit. It doesn't really
[49:50]
there's this other language in front of
[49:52]
that. And what I'm wondering is before
[49:54]
the community display/exhibit
[49:57]
if we could add a sentence that says
[50:00]
Ashlin County is considering some or all
[50:02]
of the following for public
[50:04]
participation.
[50:06]
Then that very clearly in one standalone
[50:08]
sentence is says considering some or all
[50:11]
of the following. It's by no way
[50:14]
promising and it doesn't say may which
[50:17]
can be interpreted various ways.
[50:21]
So, for simplicity sake, if this
[50:23]
committee agreed on inserting that
[50:25]
sentence above the community
[50:27]
display/exhibit as a standalone
[50:29]
sentence, then tomorrow at the board
[50:30]
meeting, a board member could make a
[50:33]
motion to change the public
[50:36]
participation plan by adding that
[50:38]
sentence there and it would save you all
[50:39]
of this. You know,
[50:43]
>> Ashlin County is considering some or all
[50:46]
» Ashlin County is considering some or all
[50:46]
of the following for public
[50:48]
participation.
[50:51]
Yeah. So, thanks that I think I would go
[50:54]
along with that. That's what I've been
[50:55]
trying to say is like let's cert some
[50:57]
clarifying language so that we don't set
[51:00]
unrealistic expectations.
[51:02]
>> And then in August, we have to be
[51:03]
» And then in August, we have to be
[51:03]
prepared. If somebody wants a certain
[51:06]
thing in there like email or website, we
[51:09]
need to pencil somebody in
[51:11]
or take it off the list.
[51:12]
>> Y
[51:13]
» Y
[51:13]
>> yeah, we're we're likely to be resource
[51:15]
» yeah, we're we're likely to be resource
[51:15]
thin. So, um I think we could take that
[51:19]
as amendment today and then it would be
[51:21]
in the the presentation tomorrow to the
[51:23]
county board if we amended it today.
[51:25]
>> I'll make move to make that amendment.
[51:27]
» I'll make move to make that amendment.
[51:27]
>> Well, hang on.
[51:29]
» Well, hang on.
[51:29]
I Well, I'll second it for purpose of
[51:32]
discussion. Now, we're going to have to
[51:33]
vote, but I'll second it, but then I'd
[51:34]
like to speak
[51:35]
>> now. So, there's an amendment on there's
[51:36]
» now. So, there's an amendment on there's
[51:36]
a a motion on the floor to amend the
[51:39]
public participation public
[51:41]
participation plan as previously
[51:43]
approved at the past meeting to say at
[51:46]
the beginning of the listing of
[51:51]
options for public participation on page
[51:54]
three that we should have a header that
[51:56]
says Ashlin County is considering some
[52:00]
or all of the following for public
[52:03]
participation. That would be the
[52:05]
amendment as I understand it. Is that
[52:08]
correct?
[52:09]
>> Well, it it is. Um but logistically
[52:12]
» Well, it it is. Um but logistically
[52:12]
speaking, the board meeting is tomorrow.
[52:13]
If we pass this today, we're changing
[52:15]
the plan the board has asked to
[52:17]
consider, which would mean you would
[52:19]
need to send the administrator an
[52:20]
updated copy of this plan today. They
[52:23]
would then need to modify what's on the
[52:26]
county website for the packet tomorrow.
[52:28]
And for those board members who get the
[52:30]
packet in print, they would need to
[52:32]
print copies to give to them. If we
[52:35]
agreed as a committee on this change
[52:37]
today, a board member tomorrow could
[52:41]
make a motion to modify the plan with
[52:43]
the sentence that you just said and then
[52:45]
say that the committee supported making
[52:47]
this change yesterday, but we're not
[52:49]
going to go through the logistics of you
[52:52]
and Dan and others having to update the
[52:54]
packet.
[52:55]
>> So, would you like to propose? Would you
[52:57]
» So, would you like to propose? Would you
[52:57]
be prepared to make that amendment
[52:59]
tomorrow?
[52:59]
>> I I would as long as this committee is
[53:02]
» I I would as long as this committee is
[53:02]
in support of making that. Um,
[53:07]
» I support.
[53:08]
>> So, you want to withdraw?
[53:09]
» So, you want to withdraw?
[53:09]
>> I'll withdraw my amend withdraw my
[53:11]
» I'll withdraw my amend withdraw my
[53:11]
amendment proposal and support the
[53:12]
course of action that Pat submits it
[53:15]
tomorrow at the board meeting.
[53:16]
>> Are there any objections to the proposal
[53:18]
» Are there any objections to the proposal
[53:18]
by Mr. Kenny?
[53:22]
Then so be it.
[53:23]
>> And we move on to the next agenda item.
[53:30]
the
[53:31]
uh
[53:33]
work
[53:35]
this this would be used this is what's
[53:37]
going to be used in discussion with land
[53:40]
as to what the job is to be done
[53:43]
so this must becomes the foundation of
[53:46]
the contract
[53:47]
I believe will be set up
[53:55]
Um, I don't know exactly who sets it up.
[53:58]
I know that, you know, Dan and Gary will
[54:01]
need to sign it as it is a contract, but
[54:04]
I would guess that you, George, are also
[54:06]
involved.
[54:08]
>> Uh, so I mean, probably it's going to
[54:11]
» Uh, so I mean, probably it's going to
[54:11]
take legal review. It' be my
[54:13]
understanding, but I'm not sure how it
[54:14]
was done last time around, so we have to
[54:16]
look into that. But anyway, as I
[54:18]
understand it, the scope of work
[54:20]
document becomes the basis for the
[54:22]
agreement with Northwest Regional
[54:24]
Planning as to who's going to do what
[54:26]
and how much they're going to contribute
[54:27]
within the amount of funding that we
[54:29]
have available to them. And I have a
[54:33]
concern. Okay, I'm I'm pretty good with
[54:36]
all of this that's in this document.
[54:40]
um you know the plan elements will
[54:43]
include at least these nine elements
[54:45]
which means there could be more which
[54:47]
was Charlie's problem and like in
[54:49]
transportation these are we looking at
[54:52]
proposed things for the future they're
[54:55]
not definite commitments that you can do
[54:56]
that I don't think I highlighted there's
[54:59]
some other things I highlighted that
[55:01]
we're looking at you know future risk
[55:03]
and opportunities and we want to promote
[55:06]
diverse sustainable economic case and
[55:09]
that land use is proposed land uses and
[55:14]
that implementation is policies,
[55:16]
programs and actions to achieve plan
[55:18]
goals.
[55:20]
Uh so we will need in the end reasonable
[55:23]
parties and strategies but my concern is
[55:25]
this.
[55:27]
I look at at what we have in terms of
[55:29]
resources among ourselves to do work. I
[55:32]
mean, some of us are professionally
[55:34]
committed and have an overload of work
[55:38]
probably already and the rest of us are
[55:40]
essentially volunteers who receive a
[55:43]
predeem for going to a meeting, but
[55:44]
essentially so there's a lot to be done
[55:47]
here and we're going to need a lot of
[55:48]
help from Northwest Regional Planning.
[55:50]
But I what I'm seeing is probably the
[55:54]
need from each
[55:57]
subcommittee team leader to be able to
[56:00]
draw upon the advisory skills of the
[56:04]
consultant.
[56:06]
So, it seems to me that if Charlie's
[56:09]
working intergovernmental or Pat's
[56:11]
working agriculture or Gary's working on
[56:13]
economic development,
[56:15]
they may need the advice and guidance of
[56:20]
experts at Northwest Regional Planning.
[56:22]
And I strikes me that it would be
[56:24]
constructive for us to establish that
[56:27]
you would have all subcommittee
[56:29]
chairpersons would have access to
[56:32]
drawing upon that expertise. And I don't
[56:34]
know what other people think about this.
[56:37]
Charlie, go ahead. I
[56:38]
>> I think if if my
[56:42]
» I think if if my
[56:42]
perception of what they're doing is
[56:44]
correct that they're going to be looking
[56:47]
at each they're going to be eyeballing
[56:49]
my element and then coming back and I
[56:52]
get to review that. So I think I feel
[56:55]
like I have the access to that expert
[56:57]
already and that they're going to be
[56:59]
applying an expert eye to my element. If
[57:03]
that's wrong, they'll tell me in August,
[57:05]
I suppose.
[57:07]
>> I guess what I'm thinking of is if you
[57:10]
» I guess what I'm thinking of is if you
[57:10]
have questions, if you need help.
[57:13]
>> Yeah.
[57:13]
» Yeah.
[57:13]
>> You have authority. Do you have
[57:14]
» You have authority. Do you have
[57:14]
authority to call Emily or Autumn and
[57:18]
ask them some questions and get some
[57:20]
advice that right now with the farmland
[57:22]
preservation plan?
[57:24]
>> So, that's what I'd like to make more
[57:25]
» So, that's what I'd like to make more
[57:25]
clear in the scope of work. And so just
[57:28]
what I wrote here is that the scope of
[57:31]
work should include a section on
[57:34]
advisory services. It doesn't spec
[57:36]
explicitly say that. And I would write
[57:39]
it this way. Advisory services to the
[57:41]
planning committee as a whole.
[57:44]
Individual committee members as leaders
[57:45]
of sub subject element subcommittees.
[57:50]
county administration and county board
[57:52]
in addition to the work and processes as
[57:55]
prescribed herein and otherwise agreed.
[57:58]
I'd like to make it very clear that
[57:59]
there's access to advisory services for
[58:02]
the people that are doing the work. I
[58:04]
don't know if you think that's I don't
[58:05]
know if you think that's necessary and
[58:06]
I'll be interested in Emily and Autumn's
[58:08]
observations. Pat, do you have a
[58:10]
comment?
[58:11]
>> Well, when we get to August and we start
[58:13]
» Well, when we get to August and we start
[58:13]
penciling things in that ties into the
[58:15]
question of how do we work with each of
[58:18]
these sections? So if I have the egg
[58:20]
section, I need to somehow coordinate
[58:22]
with Northwest Regional Planning on how
[58:25]
we do that. So implicitly we have to
[58:28]
have some access to them um to
[58:31]
coordinate this without question. But
[58:35]
given there's a limit to the budget,
[58:37]
there's a limit to their time and
[58:38]
access. So somewhere in there if we add
[58:40]
a sentence or a paragraph um as time and
[58:44]
budgets allow so that we don't have say
[58:47]
a member just asking for endless hours
[58:50]
that then push the budget outside of the
[58:53]
scope of what we have. So there's got to
[58:55]
be as time and budget allows and
[58:57]
Northwest Regional Planning would have
[58:59]
to talk to individual committee members
[59:01]
and say, "Look, you know, I can give you
[59:03]
a certain amount of time, but if
[59:05]
someone's start sucking up 40, 50, 60,
[59:08]
80 hours, that's probably not going to
[59:10]
work so well."
[59:13]
So my I thought about that problem and I
[59:15]
thought that the way to deal with that
[59:17]
is that when we do our subcommittee
[59:19]
reports at each of our committee
[59:21]
meetings, one of the things that the
[59:22]
committee members would be asked to
[59:24]
report is time
[59:27]
time on calls to Northwest Regional
[59:30]
Planning if if at all. And that would,
[59:33]
you know, if some if you if we had a
[59:35]
committee meeting and you someone said,
[59:36]
"Well, I spent 10 minutes on the phone
[59:38]
with Emily and I asked a question, but
[59:41]
somebody else says,"Well, I was on the
[59:42]
phone with Autumn for 3 hours." You
[59:44]
know, then we can see that we're bumping
[59:46]
up against limitations if we have a a
[59:48]
monthly reporting process. Pat,
[59:51]
>> I think for the August meeting, it would
[59:53]
» I think for the August meeting, it would
[59:53]
be helpful if Northwest Regional
[59:54]
Planning would tell us what they
[59:57]
typically um have as guidelines when
[1:00:00]
working with counties to update comp
[1:00:01]
plants, how this process works to set up
[1:00:04]
meetings, sharing files, back and forth,
[1:00:06]
updates, and how much time outside of
[1:00:09]
meetings is reasonable for the scope of
[1:00:12]
work that they envision for what they're
[1:00:14]
contracted for.
[1:00:18]
I don't see how we can do this without
[1:00:19]
having access to them. So, I think
[1:00:21]
that's implicit that they could tell us.
[1:00:25]
>> Gary, if you're there, do you have any
[1:00:27]
» Gary, if you're there, do you have any
[1:00:27]
observations on this?
[1:00:31]
» No, not in addition to what's already
[1:00:33]
been said. I think uh we need Northwest
[1:00:35]
Regional Planning to basically give us
[1:00:38]
the lead and and then we'll follow
[1:00:45]
» if it goes anything like the farm plan.
[1:00:47]
They're going to come back to us with
[1:00:48]
their ideas on each element and then
[1:00:50]
we'll all get to ask their expert. We'll
[1:00:53]
we'll input. We've had three meetings
[1:00:56]
now with farm planning and that's what
[1:00:58]
you've just described is what's been
[1:01:00]
happening at those meetings. We we input
[1:01:02]
to them. They take notes. They tell us
[1:01:04]
what they think and then we oh what
[1:01:06]
about this? What about that? What about
[1:01:08]
this? So and it and it's so it also
[1:01:10]
triggers those they they present it in
[1:01:12]
such a way that gets you thinking
[1:01:16]
uh it isn't it isn't like calling them
[1:01:18]
afterwards but it's definitely a long
[1:01:22]
process. I say long but it's like an
[1:01:24]
hour meeting where you go over that
[1:01:26]
element and you might do that element
[1:01:28]
three times. Who knows? But I like I
[1:01:31]
also agree that we should be able to
[1:01:33]
call them if something strikes us. So I
[1:01:36]
I I agree in theory with what you're
[1:01:38]
saying is provided it doesn't add $10
[1:01:40]
million to the bill.
[1:01:43]
>> Thank you.
[1:01:45]
» Thank you.
[1:01:45]
>> Yeah. So I I think there needs to be in
[1:01:48]
» Yeah. So I I think there needs to be in
[1:01:48]
order to get things done and to be not
[1:01:50]
get tangled up with a lot of
[1:01:52]
communication that there needs to be
[1:01:54]
empowerment of the sub subcommittee
[1:01:56]
chairpersons,
[1:01:58]
you know, not to have to call Dan or
[1:02:00]
come to come to me or, you know, just
[1:02:03]
within reason be able to go directly
[1:02:05]
with your questions to to Emily or
[1:02:06]
Autumn. So Emily, do you have an
[1:02:09]
observation on this uh chain of thought?
[1:02:13]
I would say that based on
[1:02:18]
experience from other counties that
[1:02:19]
we've worked with that have had
[1:02:20]
subcommittees for individual chapters,
[1:02:25]
we have
[1:02:28]
Northwest Regional Planning staff would
[1:02:30]
first
[1:02:32]
update the chapter
[1:02:36]
with information that we have available
[1:02:38]
to us. And once that draft is updated,
[1:02:42]
we would share that maybe on SharePoint
[1:02:44]
or whatever platform that the county
[1:02:47]
prefers. Sometimes we'll even include it
[1:02:49]
on our uh web page and those can be
[1:02:53]
downloaded by the committee members and
[1:02:55]
that's available to review by the
[1:02:58]
committee. So typically we've had you
[1:03:01]
start with uh reviewing the background
[1:03:04]
information
[1:03:05]
and making those revisions and then
[1:03:07]
moving to the visioning and the action
[1:03:10]
plan and implementation and doing it in
[1:03:13]
that sort of sequence and sharing those
[1:03:15]
documents as we go through the plan
[1:03:17]
update process. So, it works, I think,
[1:03:20]
best if Northwest Regional Planning does
[1:03:23]
the first round of updates
[1:03:26]
and um provides that first updated draft
[1:03:30]
to the subcommittee for their um
[1:03:33]
expertise and additional revisions and
[1:03:36]
any additional information that they
[1:03:37]
want to include in that updated chapter
[1:03:40]
as a sort of a basic general
[1:03:43]
update process.
[1:03:47]
My question back then
[1:03:49]
my question back then Emily is um are
[1:03:53]
you talking about the background data
[1:03:56]
>> or are you talking about the goals and
[1:03:57]
» or are you talking about the goals and
[1:03:57]
visions because I'm talking about the
[1:03:59]
goals and visions
[1:04:00]
>> all of the above but it wouldn't occur
[1:04:03]
» all of the above but it wouldn't occur
[1:04:03]
all at once. First, we would share the
[1:04:06]
background information that we have
[1:04:07]
updated and then you can use that
[1:04:10]
updated background information to help
[1:04:12]
inform the update of the visioning and
[1:04:15]
the actions.
[1:04:17]
>> Yeah. Okay. So, we we're in a parallel
[1:04:20]
» Yeah. Okay. So, we we're in a parallel
[1:04:20]
process already of trying to draw from
[1:04:24]
the public and from our departments and
[1:04:26]
committees
[1:04:28]
their ideas about how what they would
[1:04:30]
like this the future to look like.
[1:04:34]
And so it occurs to me that a committee
[1:04:37]
subcommittee may be working on a set of
[1:04:40]
data. Is it out of bounds for them to
[1:04:43]
send you an email with a question?
[1:04:46]
>> Definitely not. that would be
[1:04:47]
» Definitely not. that would be
[1:04:47]
appreciated because I know that there
[1:04:50]
are certain things that this
[1:04:53]
um committee has expertise on that
[1:04:55]
Northwest Regional Planning might not
[1:04:57]
have access to certain information or
[1:04:59]
data or plans or ideas that you might
[1:05:02]
have that should be incorporated in the
[1:05:04]
update.
[1:05:07]
So from my position here as chair,
[1:05:11]
I would want all of the subcommittee
[1:05:14]
chairpersons to be empowered, feel
[1:05:16]
empowered that they could submit
[1:05:17]
questions, you know, I send an email or
[1:05:19]
a short conversation
[1:05:21]
uh if necessary to go after the contract
[1:05:24]
is signed because we don't have that yet
[1:05:27]
and that we would monitor that
[1:05:29]
utilization by in our
[1:05:32]
reports at our monthly meetings. So when
[1:05:34]
we go around the table and say each
[1:05:36]
subcommittee's reporting, that's where
[1:05:39]
we we collect a little understanding of
[1:05:41]
how much utilization or underutilization
[1:05:44]
we would be uh drawing upon. And if if
[1:05:47]
if Emily or thought that we were uh
[1:05:50]
using up too much time on you know long
[1:05:53]
conversations that she could also let us
[1:05:55]
know. Does that sound amendable to the
[1:05:57]
group?
[1:05:59]
>> Because if not maybe we just move on.
[1:06:01]
» Because if not maybe we just move on.
[1:06:01]
Maybe we any other discussion on the uh
[1:06:03]
scope of work.
[1:06:07]
» Um I actually want to go back to the um
[1:06:12]
proposed comp plan public participation
[1:06:16]
and then because I might end up coming
[1:06:17]
back to the scope of work and and on
[1:06:20]
page five of the participation plan if
[1:06:23]
someone can explain to me it's the
[1:06:25]
bottom of page five the focus groups.
[1:06:27]
There's two lists there both one through
[1:06:29]
seven and the first list
[1:06:33]
the second item is trends and issues and
[1:06:36]
then the second list you know is largely
[1:06:38]
a reorganization of the first seven but
[1:06:41]
what is missing
[1:06:43]
is in the second grouping
[1:06:47]
um
[1:06:49]
issues is missing
[1:06:53]
the trends and issues what happened to
[1:06:55]
that and then if we go back to the nine
[1:06:57]
required items. There's issues and
[1:06:59]
opportunities. So we went from in the
[1:07:02]
comp plan nine elements we went from
[1:07:04]
issues and opportunities on the focus
[1:07:06]
groups. Number two is trends and issues
[1:07:08]
and then it is not seen in the second
[1:07:11]
group of seven which left me with
[1:07:13]
question.
[1:07:16]
>> This is Emily. Issues and opportunities
[1:07:18]
» This is Emily. Issues and opportunities
[1:07:18]
is the name of the element
[1:07:22]
uh as written in the comprehensive
[1:07:24]
planning law.
[1:07:25]
>> Right. But a lot of you Ashlin County
[1:07:28]
» Right. But a lot of you Ashlin County
[1:07:28]
must refer to that as trends and issues
[1:07:30]
and it was not a part of the element
[1:07:33]
focus groups for this public
[1:07:35]
participation plan because that county's
[1:07:38]
trends and issues or issues and
[1:07:40]
opportunities was only a list of the
[1:07:43]
issues and opportunities.
[1:07:45]
So it was a full committee exercise of
[1:07:49]
updating the list of issues and
[1:07:50]
opportunities in the county and it was
[1:07:52]
not at the subcommittee level. It was a
[1:07:54]
full committee level meeting that that
[1:07:56]
occurred.
[1:07:58]
>> So for the sake of clarity, would it be
[1:08:01]
» So for the sake of clarity, would it be
[1:08:01]
helpful if we train change trends and
[1:08:03]
issues to issues and opportunities
[1:08:06]
for consistency?
[1:08:08]
>> I'll leave that up to the committee, but
[1:08:10]
» I'll leave that up to the committee, but
[1:08:10]
it's for consistency with the
[1:08:12]
comprehensive planning law. It might be
[1:08:14]
reasonable.
[1:08:17]
>> Okay. So, I'm going to
[1:08:21]
» Okay. So, I'm going to
[1:08:21]
make a motion that at the board meeting
[1:08:24]
tomorrow, the following change is
[1:08:25]
supported. In focus groups number two,
[1:08:28]
we change trends and issues to issues
[1:08:31]
and opportunities so it's consistent
[1:08:33]
with the element from the requirements
[1:08:36]
for the comp plan.
[1:08:39]
>> Well, okay. So, I need you to write that
[1:08:41]
» Well, okay. So, I need you to write that
[1:08:41]
down on paper so Karisha would have it
[1:08:42]
specifically.
[1:08:45]
So, at the board meeting tomorrow, I
[1:08:47]
would make a motion that in the
[1:08:51]
um public participation plan on page
[1:08:55]
five
[1:08:58]
under focus groups number two, trends
[1:09:01]
and issues
[1:09:06]
is changed to
[1:09:13]
issues. and opportunities
[1:09:19]
so that it is consistent with the
[1:09:21]
language used in one of the nine
[1:09:23]
required elements of the comp plan.
[1:09:37]
So it I interpret that as needing no
[1:09:40]
action at this time because that's going
[1:09:41]
to be brought as a motion tomorrow.
[1:09:44]
>> Yeah.
[1:09:45]
» Yeah.
[1:09:45]
>> Okay.
[1:09:51]
» Are there further comments or discussion
[1:09:53]
on scope of work?
[1:09:58]
Um,
[1:10:02]
I'm just going to make a note that on
[1:10:05]
lower part of page three in one of the
[1:10:08]
bullets, second to the last of volume
[1:10:10]
two, it says issues and opportunities.
[1:10:12]
So, we we see it there. Now, the
[1:10:14]
language is consistent.
[1:10:16]
Excuse me.
[1:10:22]
» Could you repeat that, please, Pat?
[1:10:25]
Um
[1:10:27]
under volume two second to the last
[1:10:29]
bullet is issues and opportunities. So
[1:10:33]
now the proposed change for tomorrow
[1:10:36]
changing trends and issues to issues and
[1:10:38]
opportunities will occur
[1:10:42]
um in the comp plan required elements in
[1:10:44]
the previous document and it's
[1:10:46]
consistent with issues and opportunities
[1:10:48]
shown here. And so it's consistent then
[1:10:51]
which makes it simpler for those of us
[1:10:53]
who are easily confused.
[1:10:56]
» Erica,
[1:10:58]
>> I have uh a few suggestions just for
[1:11:02]
» I have uh a few suggestions just for
[1:11:02]
consistency and clarity of word choice
[1:11:06]
across documents. But since this does
[1:11:08]
not need to be finalized today, I think
[1:11:11]
we should probably just do that as we
[1:11:14]
talk with Northwest Regional.
[1:11:17]
>> Uh okay. So I I agree with Erica's
[1:11:19]
» Uh okay. So I I agree with Erica's
[1:11:19]
comment. This is
[1:11:21]
this is input document for
[1:11:25]
preparation of a a contractual document
[1:11:29]
and if there'll be rewarding and better
[1:11:32]
wording of things I imagine in the
[1:11:33]
contract and it'll be subject to a back
[1:11:36]
and forth and discussion between
[1:11:39]
our representative and Northwest
[1:11:41]
Regional Planning. So this basically
[1:11:44]
sort of represents intent.
[1:11:46]
And so the only thing that I thought I
[1:11:48]
needed to add for intent was that idea
[1:11:51]
of that I I need my committee these
[1:11:54]
committee members to have access to the
[1:11:58]
consultant with if they have if you have
[1:12:00]
questions or need advice. That's the
[1:12:01]
only thing I really wanted to add.
[1:12:03]
Anybody else?
[1:12:06]
Yeah. I really just want to express
[1:12:08]
support for Erica's desire to have
[1:12:11]
consistency of language. When I see
[1:12:13]
language that's different, I can spend a
[1:12:16]
lot of time trying to figure out why is
[1:12:18]
this language different? Is it the same
[1:12:19]
thing or not? And if it's stated
[1:12:23]
differently or different words chosen,
[1:12:25]
why is it different? Um, so I really
[1:12:27]
appreciate the consistency of language
[1:12:29]
and any extent that Erica, Alyssa, and
[1:12:31]
others can make that language
[1:12:33]
consistent, I really really appreciate
[1:12:35]
that. So I don't go down rabbit holes.
[1:12:42]
» Are we going to do that?
[1:12:44]
>> Are we going to do that? Suggest that or
[1:12:47]
» Are we going to do that? Suggest that or
[1:12:47]
should we give um are we going to talk
[1:12:49]
about that language changes? Because in
[1:12:53]
the public participation plan on page
[1:12:55]
five, it says focus groups, trends, and
[1:12:58]
issues, which is what you want to change
[1:13:01]
to issues and opportunities to be part
[1:13:04]
of the um scope of work. Is that what
[1:13:08]
you're saying?
[1:13:09]
>> Yeah. In fact, that's a good point. If
[1:13:11]
» Yeah. In fact, that's a good point. If
[1:13:11]
it occurs in more than one place, we
[1:13:13]
should make changes to the entire
[1:13:14]
document
[1:13:15]
>> and the public participation.
[1:13:17]
» and the public participation.
[1:13:17]
>> Yeah. because it it says trends and
[1:13:20]
» Yeah. because it it says trends and
[1:13:20]
issues in
[1:13:20]
>> so I should I mean if the committee is
[1:13:23]
» so I should I mean if the committee is
[1:13:23]
okay with it replace trends and issues
[1:13:25]
with issues and opportunities in the
[1:13:27]
public participation plan and then
[1:13:29]
someone could do a search and catch them
[1:13:31]
all that would be good. Yeah.
[1:13:36]
And does that mean that because and
[1:13:40]
Erica you you've done a lot of planning
[1:13:42]
to me trends, issues, and opportunities
[1:13:46]
are all different perspectives,
[1:13:50]
but it sounds like what we're suggesting
[1:13:52]
is we don't talk about trends
[1:13:54]
necessarily.
[1:13:56]
We talk about issues and then
[1:13:59]
opportunities arising, but not
[1:14:01]
necessarily trends. Like we said,
[1:14:04]
housing,
[1:14:05]
you know, is becoming perhaps more and
[1:14:08]
more um owned by seasonal residents. So
[1:14:11]
that's a trend is do we want to just
[1:14:14]
give instruct since I'm doing the issues
[1:14:16]
and now opportunities group
[1:14:20]
>> in sorry in the scope of work or in the
[1:14:22]
» in sorry in the scope of work or in the
[1:14:22]
public participation plan
[1:14:24]
>> in in the whole participation plan. If
[1:14:26]
» in in the whole participation plan. If
[1:14:26]
we're taking out trends, are we we we
[1:14:29]
are we're still going to want to talk
[1:14:30]
about trends, right? We're we're
[1:14:32]
changing language
[1:14:36]
that changes the discussion.
[1:14:39]
>> Uh if I may, if is there any reason we
[1:14:41]
» Uh if I may, if is there any reason we
[1:14:41]
can't just say trends, issues, and
[1:14:42]
opportunities?
[1:14:43]
>> That's what I'm asking. I mean,
[1:14:45]
» That's what I'm asking. I mean,
[1:14:45]
>> I don't see they all seem to go
[1:14:47]
» I don't see they all seem to go
[1:14:47]
together. Trends in give uh insight to
[1:14:51]
issues which open up discussion of
[1:14:54]
opportunities. It's kind of a sequential
[1:14:56]
thing.
[1:14:57]
>> That's what I'm asking. So I would
[1:14:58]
» That's what I'm asking. So I would
[1:14:58]
prefer the language trends, trends,
[1:15:00]
issues and opportunities.
[1:15:01]
>> And the definition
[1:15:03]
» And the definition
[1:15:04]
of the issues and opportunities element
[1:15:06]
is that it includes background
[1:15:08]
information on the county and a
[1:15:10]
statement of overall objectives,
[1:15:12]
policies, goals, and programs of the
[1:15:14]
county to guide future development and
[1:15:16]
redevelopment of the county over a
[1:15:18]
20-year planning period. Background
[1:15:21]
information includes population,
[1:15:23]
household, and employment for CRA Cass.
[1:15:27]
that the county uses in developing its
[1:15:29]
comprehensive plan and demographic
[1:15:31]
trends, age distribution, education
[1:15:34]
levels, income levels, and employment
[1:15:37]
characteristics that exist within the
[1:15:40]
county.
[1:15:41]
So within the definition, it does
[1:15:43]
incorporate the housing and population
[1:15:47]
trends and projections.
[1:15:51]
So when I have those public
[1:15:53]
conversations or however we do those,
[1:15:55]
we'll make sure that we're going to
[1:15:57]
bring up those three things and then
[1:15:58]
they'll be fact checked by trends that
[1:16:01]
have been identified in volume one.
[1:16:05]
Does that sound right?
[1:16:08]
>> Yeah.
[1:16:10]
» Yeah.
[1:16:10]
>> So if we may, we could move on to item
[1:16:13]
» So if we may, we could move on to item
[1:16:13]
5e, which is our working relationship
[1:16:15]
and scheduling with Northwest Regional
[1:16:18]
Planning.
[1:16:20]
Uh Emily, are you sort of able to give
[1:16:22]
us the outline of how we proceed with
[1:16:25]
you folks from, you know, development of
[1:16:28]
contract and our first steps forward?
[1:16:31]
>> The next step would be to
[1:16:35]
» The next step would be to
[1:16:35]
develop a contract based on the scope of
[1:16:37]
work and the county board to approve
[1:16:40]
that contract with Northwest Regional
[1:16:42]
Planning.
[1:16:45]
And typically, I think what we've done
[1:16:48]
with other counties is have a more
[1:16:49]
condensed version of this scope of work,
[1:16:53]
like sort of a one page for the
[1:16:55]
contract,
[1:16:56]
and then we internally have this longer,
[1:17:00]
more comprehensive document to work with
[1:17:03]
um between the committee and the staff
[1:17:05]
members at Northwest Regional Planning.
[1:17:07]
If that sounds reasonable,
[1:17:13]
» that means to me that we'll need this
[1:17:14]
contract approved at the county board
[1:17:16]
meeting next month.
[1:17:18]
>> Otherwise, we'll have be delayed.
[1:17:20]
» Otherwise, we'll have be delayed.
[1:17:20]
>> So,
[1:17:23]
» So,
[1:17:23]
I think we have an expedited process. Uh
[1:17:26]
there'll be an amendment to the already
[1:17:27]
approved public participation plan at
[1:17:30]
the county board meeting tomorrow. And
[1:17:32]
either an amendment will pass or not
[1:17:35]
pass. and then either the public
[1:17:37]
participation plan will pass or not
[1:17:38]
pass. Hopefully the county board will
[1:17:40]
approve it and then we'll be able to
[1:17:42]
move forward with the contract based on
[1:17:44]
the scope of work and hopefully in
[1:17:46]
August the county board will approve
[1:17:48]
that contract. Erica,
[1:17:50]
>> quick question just as to timeline. Will
[1:17:53]
» quick question just as to timeline. Will
[1:17:53]
we meet with Northwest Regional to talk
[1:17:56]
about the scope of work at least as a
[1:17:59]
subgroup of us to actually delineate
[1:18:02]
verbiage and requirements
[1:18:05]
and then bring it back to this committee
[1:18:09]
as a whole to vote yes or no and then
[1:18:11]
take it to the county board.
[1:18:14]
>> I think that's I would prefer not to go
[1:18:17]
» I think that's I would prefer not to go
[1:18:17]
that route because I think it takes too
[1:18:18]
much time.
[1:18:20]
I think I would be looking to the county
[1:18:22]
administrator to determine how it would
[1:18:26]
be most expeditious to put the contract
[1:18:29]
in place so that the work of the
[1:18:30]
committee with boardwise regional
[1:18:32]
planning can go forward. If we become
[1:18:35]
too legalistic and bureaucratic, we're
[1:18:37]
just not going to move forward.
[1:18:40]
participation.
[1:18:41]
>> Go ahead.
[1:18:42]
» Go ahead.
[1:18:42]
>> Would it be reasonable for me to send
[1:18:45]
» Would it be reasonable for me to send
[1:18:45]
the scope of services in a contract form
[1:18:49]
for that smaller group to review?
[1:18:54]
So, it talks about what Northwest
[1:18:56]
Regional Planning will be responsible
[1:18:59]
for, what Ashlin County will be
[1:19:01]
responsible for, and is that certain
[1:19:05]
that the county is interested in doing
[1:19:07]
the public opinion digital survey
[1:19:11]
with a um summary report of key
[1:19:15]
findings? Should that be included?
[1:19:19]
Why don't you send that to
[1:19:22]
>> You could send that to
[1:19:24]
» You could send that to
[1:19:24]
um Dan Grady,
[1:19:28]
Gary Merte,
[1:19:31]
George Buset
[1:19:34]
and we will take a look at it and I will
[1:19:36]
disseminate it to the rest of the
[1:19:38]
committee for comment and we will
[1:19:41]
integrate our comments. uh and
[1:19:44]
I think the focal point subject to his
[1:19:47]
agreement will have to be the county
[1:19:48]
administrator for the preparation and uh
[1:19:52]
legal review to get legal review of the
[1:19:54]
contract. So yes, that'll be fine.
[1:19:56]
Please do so.
[1:19:58]
>> All right, we'll plan to do that.
[1:20:03]
» Okay.
[1:20:04]
>> The other the scope of work you're
[1:20:05]
» The other the scope of work you're
[1:20:05]
talking about today at this meeting can
[1:20:08]
be a working document as well.
[1:20:11]
>> Thank you.
[1:20:13]
» Thank you.
[1:20:13]
So moving on, uh the next agenda item is
[1:20:16]
to discuss um 5F which is township
[1:20:20]
inputs to planning.
[1:20:23]
So the question is how we're going to
[1:20:26]
how would we do that? The idea was to go
[1:20:29]
out to the towns
[1:20:33]
and ask them to include this in their
[1:20:35]
town meeting agendas.
[1:20:38]
And I don't know.
[1:20:40]
I think we're not doing that quite yet.
[1:20:43]
Listen, have you had any progress on
[1:20:45]
that?
[1:20:47]
>> Um, no, not yet.
[1:20:49]
» Um, no, not yet.
[1:20:49]
>> So, that we'll have to figure out who's
[1:20:51]
» So, that we'll have to figure out who's
[1:20:51]
going to do that at our I think our
[1:20:53]
August meeting is going to have to be
[1:20:56]
nuts and bolts. Figure out who's going
[1:20:57]
to do what meeting
[1:21:00]
and that would be part of it.
[1:21:02]
So if there's nothing on township
[1:21:04]
inputs, then we move to um discussion of
[1:21:07]
communication vehicles,
[1:21:10]
anybody?
[1:21:16]
Paul, how about your computer, Charlie?
[1:21:19]
I I guess I kind of thought that would
[1:21:22]
be
[1:21:23]
that Northwest Regional will tell us
[1:21:25]
what they're where they're going to have
[1:21:27]
these documents and how we can feed back
[1:21:29]
on them or just look at them cuz we're
[1:21:33]
not going to have them somewhere. Right,
[1:21:37]
>> Erica?
[1:21:38]
» Erica?
[1:21:38]
>> So, we have a SharePoint site set up and
[1:21:42]
» So, we have a SharePoint site set up and
[1:21:42]
Emily referred to it. I assume that
[1:21:44]
Emily's referring to our SharePoint
[1:21:46]
site. Um, are people able to access that
[1:21:50]
yet? I have talked with Dan about this
[1:21:53]
many times and I don't know how many
[1:21:56]
times he's contacted it about it, but I
[1:22:00]
mean there is already a lot of documents
[1:22:02]
on there, surveys that Lisa has done,
[1:22:06]
surveys of staff that I have done, um,
[1:22:09]
old documents, other input, it's all
[1:22:12]
there and it should be accessible to
[1:22:15]
everyone. Um, I think last time George
[1:22:18]
you said you couldn't access it. There
[1:22:22]
was at least once that Dan himself
[1:22:24]
couldn't access it on his iPad or on,
[1:22:28]
you know, whatever other technology
[1:22:31]
other than his desktop. So I I just need
[1:22:33]
to know and if I need to go straight to
[1:22:35]
it and like somehow figure this out
[1:22:38]
because we have that set and I'd really
[1:22:41]
like for people to be able to get to it
[1:22:43]
cuz I have put many many hours into it
[1:22:46]
already. Um yeah I mean I think the
[1:22:49]
other things here we should definitely
[1:22:51]
talk about but I think as like as a
[1:22:53]
clearing house of information for us we
[1:22:56]
have that.
[1:23:00]
» Okay. And this is Emily from Northwest
[1:23:02]
Regional Planning. I don't believe we've
[1:23:04]
seen or have access to that SharePoint
[1:23:06]
either.
[1:23:07]
>> Okay.
[1:23:12]
» What's the address to it?
[1:23:14]
>> Uh, it was sent to everyone on the
[1:23:16]
» Uh, it was sent to everyone on the
[1:23:16]
committee at least twice.
[1:23:18]
>> Okay.
[1:23:18]
» Okay.
[1:23:18]
>> I can send it again. I do need to double
[1:23:22]
» I can send it again. I do need to double
[1:23:22]
check though, Emily,
[1:23:25]
if the county will add Northwest
[1:23:27]
Regional to it. um because it it is
[1:23:31]
within the administration drive and so
[1:23:34]
then you would have access to kind of
[1:23:36]
>> a bunch of other documents that you
[1:23:37]
» a bunch of other documents that you
[1:23:37]
probably shouldn't have access to.
[1:23:40]
>> Um so I'll
[1:23:41]
» Um so I'll
[1:23:42]
>> if that's the case we could utilize
[1:23:44]
» if that's the case we could utilize
[1:23:44]
Northwest Regional Planning SharePoint
[1:23:47]
for any sort of draft materials.
[1:23:49]
>> Okay. I'll talk to Dan about that
[1:23:51]
» Okay. I'll talk to Dan about that
[1:23:51]
tomorrow and see what the best course of
[1:23:53]
action is.
[1:23:55]
>> Okay.
[1:23:59]
uh comment on that is that um Erica did
[1:24:02]
send me that I wasn't I've haven't been
[1:24:03]
able to get into SharePoint yet, but
[1:24:05]
Erica sent me copies of all the county
[1:24:08]
departments inputs and it's terrific
[1:24:11]
material. We all have feedback from all
[1:24:13]
of the county departments
[1:24:16]
on their views of input to the the
[1:24:18]
comprehensive plan and it's it's great
[1:24:20]
stuff. See, we just really all need to
[1:24:23]
be able to get into SharePoint and look
[1:24:24]
at this stuff because when we start
[1:24:26]
getting the feedback from the towns,
[1:24:28]
that'll be in the same location and a
[1:24:31]
lot of our committee work will be in the
[1:24:32]
same location. So, Charlie, you had to
[1:24:34]
come in.
[1:24:35]
>> Yeah, but I have a different one now.
[1:24:37]
» Yeah, but I have a different one now.
[1:24:37]
Uh, so the when we say feedback from the
[1:24:40]
townships, are we looking for that in
[1:24:42]
their updates to their plans or their
[1:24:45]
direct input to this plan
[1:24:48]
or both? Well, I think we're looking for
[1:24:50]
their input to the county's perspective,
[1:24:52]
but obviously that's going to have a lot
[1:24:54]
to do with what they think about their
[1:24:56]
own townships.
[1:24:57]
>> Yeah.
[1:24:57]
» Yeah.
[1:24:58]
>> But they they may have comments about
[1:25:00]
» But they they may have comments about
[1:25:00]
county roads, things that they aren't
[1:25:01]
responsible for that, but that that
[1:25:03]
affect them.
[1:25:04]
>> Okay.
[1:25:05]
» Okay.
[1:25:05]
And then the SharePoints, I I assume
[1:25:08]
that
[1:25:11]
our SharePoint is for inputs to their to
[1:25:16]
NWRPCs. will then add them to that do
[1:25:19]
their document or not or somehow and
[1:25:22]
then that that'll be on the the rewrites
[1:25:26]
going to be on on the NWRPC share points
[1:25:30]
right the actual
[1:25:31]
>> we have not figured that out yet that's
[1:25:33]
» we have not figured that out yet that's
[1:25:33]
what I'm going to try to figure out okay
[1:25:35]
tomorrow for the fourth
[1:25:37]
>> all right thank you
[1:25:42]
okay anything further on communications
[1:25:45]
Pat
[1:25:45]
>> this is Liz I got to leave. I'm going to
[1:25:48]
» this is Liz I got to leave. I'm going to
[1:25:48]
work. All right. Thank you everybody.
[1:25:50]
Byebye.
[1:25:51]
>> Take care, Liz.
[1:25:52]
» Take care, Liz.
[1:25:52]
>> Bye.
[1:25:52]
» Bye.
[1:25:52]
>> Bye. You too.
[1:25:54]
» Bye. You too.
[1:25:54]
>> Yeah.
[1:25:55]
» Yeah.
[1:25:55]
>> You know, it occurs to me from um from
[1:25:58]
» You know, it occurs to me from um from
[1:25:58]
when I was teaching and we started
[1:26:01]
putting lots of stuff online. I taught
[1:26:03]
lots of online and ITV courses is I
[1:26:06]
always tried to keep things really
[1:26:07]
organized and not be redundant. Um and
[1:26:11]
so there was a logical place to find
[1:26:13]
stuff. I would keep those documentes
[1:26:15]
those documents updated and current and
[1:26:18]
I wouldn't have a bunch of what I call
[1:26:20]
clutter that people had to wade through.
[1:26:21]
I wouldn't have the same thing in
[1:26:23]
multiple places. Some instructors say,
[1:26:24]
"Oh, they can always find it here. You
[1:26:26]
can find it there." And what I think
[1:26:28]
about is when we get to this time of
[1:26:30]
year and we started preparing for
[1:26:32]
semester,
[1:26:34]
um some people would say, "Oh, I got to
[1:26:36]
update this and that." It was like, "Why
[1:26:37]
do you have in so many places?" And of
[1:26:38]
course, they don't remember to update
[1:26:40]
everything. the more stuff you have out
[1:26:42]
there, the more vehicles of
[1:26:43]
communication, the more things that have
[1:26:46]
to be updated, the more things that you
[1:26:48]
have to take data information from one
[1:26:49]
place and then stick it somewhere else.
[1:26:51]
If you're saying, "I'm going to make all
[1:26:52]
this available." So, the more places you
[1:26:55]
have stuff and the more it has to be
[1:26:56]
coordinated and transferred to and the
[1:26:58]
more it has to be updated, not only is
[1:27:01]
it a lot of work and it's what I call
[1:27:04]
self-inflicted wounds because people
[1:27:05]
have too much in too many places
[1:27:07]
because, oh, I'm going to do it on
[1:27:08]
social media. I'm going to do it all
[1:27:09]
these other places. It sounds great
[1:27:12]
until someone has to coordinate and do
[1:27:13]
the work and keep it current, but it
[1:27:15]
also means it's harder for, you know, in
[1:27:18]
this case, the public to find stuff
[1:27:19]
because now they're waiting through in
[1:27:21]
different places looking for stuff and
[1:27:23]
it all can't be current and updated at
[1:27:25]
the same time because, well, somebody's
[1:27:27]
got to do that. So, I actually think
[1:27:29]
there's a lot of merit to to
[1:27:32]
being concise both with the
[1:27:36]
types of communications and how it's
[1:27:39]
stored, how it's organized, how it's
[1:27:41]
presented, you know, as we go through
[1:27:43]
this process because too much in too
[1:27:44]
many places. And then somebody might
[1:27:46]
say, "Oh, I've seen three places I could
[1:27:48]
give input, so I'm going to give input
[1:27:49]
in all three places." Well, that isn't
[1:27:51]
really statistically valid either
[1:27:53]
because it's the same person doing it
[1:27:55]
multiple times just because they can.
[1:27:57]
So, you know, all these ways that we're
[1:28:00]
going to engage the public have bearing
[1:28:02]
on how many ways we're going to
[1:28:04]
communicate and who's going to do the
[1:28:05]
work of organizing synthesizes and
[1:28:07]
keeping it up to date. They tie
[1:28:09]
together. And it's nice to be ambitious,
[1:28:12]
but that doesn't always translate to
[1:28:14]
clarity and ease of use.
[1:28:18]
>> Other comment, Erica?
[1:28:21]
» Other comment, Erica?
[1:28:21]
>> Sorry, this doesn't refer to Pat's
[1:28:23]
» Sorry, this doesn't refer to Pat's
[1:28:23]
comment. Just going back to the township
[1:28:25]
inputs. Oh, just just wanted to ask I
[1:28:28]
mean at what point are you imagining
[1:28:33]
this George? Is it is it that we should
[1:28:36]
take the first draft of the full comp
[1:28:39]
plan to each of the townships
[1:28:42]
or
[1:28:44]
make efforts at the subcommittee level
[1:28:46]
to include township feedback within
[1:28:49]
their sections? Or is that what we're
[1:28:53]
figuring out today? I'm just trying to
[1:28:55]
>> Yeah. I know I'm against
[1:28:58]
» Yeah. I know I'm against
[1:28:58]
We're going to attempt to do with the
[1:28:59]
townships the same thing we did with the
[1:29:01]
county departments. That was as simple
[1:29:03]
as that.
[1:29:09]
Moving on.
[1:29:11]
Is there anything more on communications
[1:29:13]
to discuss
[1:29:21]
» which is review of progress versus
[1:29:24]
calendarized work plan which is
[1:29:25]
basically laid out in
[1:29:30]
I kind of check whether
[1:29:35]
we're behind schedule or not behind
[1:29:38]
schedule. This is at the end of the
[1:29:39]
scope of work in a grid format.
[1:29:42]
Going there you go.
[1:29:47]
So in this layout which is just a
[1:29:50]
typical kind of 18month scenario that
[1:29:54]
was provided in the Bernett County
[1:29:57]
example basically. So, Northwest
[1:30:00]
Regional Planning provided us a c uh
[1:30:02]
Paul a copy of another county's planning
[1:30:06]
and the scope of work basically comes
[1:30:08]
out of that. So, in our scope of work,
[1:30:11]
there is this timetable. It's kind of a
[1:30:14]
checklist of whether we're keeping up or
[1:30:16]
not, and it's an 18-month cycle. So,
[1:30:21]
if we're going to be done by the end of
[1:30:22]
2026, this would be the first month of
[1:30:24]
the cycle.
[1:30:26]
It'd be July. And uh so month one would
[1:30:29]
be established steering committee
[1:30:32]
um and internal plan review to identify
[1:30:35]
content and revisions. I don't know that
[1:30:38]
we've all really done that, but
[1:30:41]
hopefully each uh subcommittee element
[1:30:45]
is looking at their individual elements
[1:30:47]
and reviewing it and taking that as
[1:30:49]
input.
[1:30:51]
And as far as I can see, that's where we
[1:30:53]
are right now. And then in pre-planning
[1:30:56]
month two here is revise and adopt
[1:30:59]
public participation plan. So I think
[1:31:02]
I'd say we're on schedule. And then in
[1:31:04]
month three which would be August.
[1:31:07]
No should be actually September would be
[1:31:10]
you know set up plan update web page.
[1:31:12]
Maybe we'll be able to do that maybe
[1:31:13]
not. Engage local units of government
[1:31:17]
and to issue press releases. So if we're
[1:31:20]
get the public participation plan in
[1:31:23]
place uh as of August, I think we're on
[1:31:26]
target and then if on month three we
[1:31:28]
have some some objectives to work for.
[1:31:30]
Is there discussion?
[1:31:36]
I mean to me looks to me like we're all
[1:31:38]
doing okay.
[1:31:41]
Being no discussion, we move on to the
[1:31:43]
question of publicity
[1:31:46]
because right now I don't think the
[1:31:48]
public has any sense that we're doing
[1:31:50]
this at all. I don't know what people's
[1:31:53]
ideas might be.
[1:32:05]
» Any thoughts, comments, conversation on
[1:32:07]
on publicity?
[1:32:10]
If not,
[1:32:11]
>> I do.
[1:32:12]
» I do.
[1:32:12]
>> Oh, Charlie. Okay, good.
[1:32:13]
» Oh, Charlie. Okay, good.
[1:32:13]
>> Didn't we just talk about that earlier?
[1:32:17]
» Didn't we just talk about that earlier?
[1:32:17]
And we were worried about the
[1:32:22]
throwing out too many ways to get that
[1:32:25]
publicity for it. Is that what you meant
[1:32:28]
by this or not? Uh what I mean is
[1:32:32]
raising public awareness that there's a
[1:32:34]
comprehensive plan review going on and
[1:32:35]
they're invited to provide input and I
[1:32:38]
don't think the public has has a clue
[1:32:40]
that we're doing this and we have to
[1:32:41]
talk about ways of informing them that
[1:32:43]
we're doing it.
[1:32:44]
>> That's what I thought we're going to
[1:32:46]
» That's what I thought we're going to
[1:32:46]
address that we the Cadillac plan that
[1:32:49]
isn't aren't those all ways we were
[1:32:52]
going to try to generate publicity and
[1:32:53]
we're just not there yet.
[1:32:56]
>> Those are ways that we can engage but
[1:32:58]
» Those are ways that we can engage but
[1:32:58]
there could be other ways and other
[1:32:59]
ideas. Okay, Erica.
[1:33:01]
>> All right, I got you. I don't have any
[1:33:02]
» All right, I got you. I don't have any
[1:33:02]
additional, but thank you for that
[1:33:04]
clarification.
[1:33:05]
>> So, one thing I' uh we talked about this
[1:33:07]
» So, one thing I' uh we talked about this
[1:33:07]
really briefly last time, but I would
[1:33:09]
like to say I I would be very happy to
[1:33:11]
write a press release for us. I think
[1:33:14]
maybe the best timing for that. So, it's
[1:33:16]
in the pre-planning. It's in the month
[1:33:18]
three, the next month thing. It's is
[1:33:20]
listed. Um, but I think it would
[1:33:24]
probably be good to have a signed
[1:33:28]
uh agreement with Northwest Regional so
[1:33:30]
that we announce that that we have the
[1:33:34]
website fully operational with actual
[1:33:36]
information on it and an email so that
[1:33:39]
we can refer people. If you're
[1:33:41]
interested in a subcommittee, if you're
[1:33:43]
interested, then let us know through
[1:33:45]
email, right? so that there's like one
[1:33:47]
one portal to the county for um that uh
[1:33:52]
but then I would also suggest that we
[1:33:54]
use some sort of photo right we it it's
[1:33:58]
people don't sort of focus in on a story
[1:34:01]
if you don't include at least one image
[1:34:03]
I think so if there are suggestions for
[1:34:05]
photos if or if we want to do the tree
[1:34:07]
planting before that you know I just
[1:34:09]
think the the timing maybe needs to come
[1:34:12]
just slightly later because we need to
[1:34:14]
have things to declare there and places
[1:34:16]
for people to go within that press
[1:34:19]
release.
[1:34:35]
Other thoughts and comments?
[1:34:38]
Well, if you're going to plant a tree,
[1:34:39]
you know, you can plant them spring or
[1:34:41]
fall, but in the fall when things have
[1:34:43]
gone dormant. So, don't, you know, in
[1:34:44]
the middle of August, plant your tree
[1:34:46]
because that would raise eyebrows, at
[1:34:49]
least among some.
[1:34:52]
>> So, the best time to plant a tree is in
[1:34:53]
» So, the best time to plant a tree is in
[1:34:53]
the spring.
[1:34:55]
>> Most trees get planted in the spring,
[1:34:56]
» Most trees get planted in the spring,
[1:34:56]
but you can plant in the fall, too.
[1:34:58]
Depends on the species to some extent
[1:35:00]
and the size, but but certainly not in
[1:35:03]
August.
[1:35:04]
>> Okay.
[1:35:06]
» Okay.
[1:35:06]
Uh it strikes me that a pressure release
[1:35:09]
at the time of the signing of the
[1:35:11]
contract with Northwest Regional
[1:35:12]
Planning would be a good announcement
[1:35:15]
that county is as is launching his
[1:35:18]
comprehensive plan effort and is uh
[1:35:20]
contracted with Northwest Regional
[1:35:22]
Planning to to assist with this work
[1:35:24]
that worthy of a press release and and
[1:35:28]
then other things could follow. I don't
[1:35:29]
think we have to do it all at once.
[1:35:31]
Other ideas, comments?
[1:35:41]
Item six on the agenda is the scheduled
[1:35:43]
next meeting, which I have tenatively
[1:35:45]
put down here for uh Monday, August 18.
[1:35:50]
That's agreeable to folks. I think we
[1:35:52]
just stick with that date
[1:35:56]
and then we get to our second public
[1:35:58]
comment period. I don't see anybody
[1:36:00]
online for public comment. I don't see
[1:36:03]
anybody present for public comment. So
[1:36:06]
then
[1:36:07]
we're down to item eight.
[1:36:09]
>> George, I might have something August
[1:36:10]
» George, I might have something August
[1:36:10]
18th, but I don't have my calendar here,
[1:36:12]
so don't be surprised if I email you.
[1:36:14]
>> Okay. Um,
[1:36:17]
» Okay. Um,
[1:36:17]
>> this is autumn at Northwest Regional
[1:36:19]
» this is autumn at Northwest Regional
[1:36:19]
Planning.
[1:36:20]
>> Go ahead.
[1:36:21]
» Go ahead.
[1:36:21]
>> U, we have a standing meeting every
[1:36:22]
» U, we have a standing meeting every
[1:36:22]
third Monday at one. We actually me and
[1:36:26]
Emily had to step out of that meeting
[1:36:28]
today to attend this one. Um so that
[1:36:32]
normally would provide a conflict um at
[1:36:37]
1:00.
[1:36:41]
» Uh how about 2:00?
[1:36:48]
» No. Hello. Uh potentially um our
[1:36:53]
standing um meeting is actually out of
[1:36:56]
the office. We normally would return
[1:37:00]
on those at about 3:30.
[1:37:05]
>> Okay. Maybe you could look at um at how
[1:37:07]
» Okay. Maybe you could look at um at how
[1:37:07]
flexible your your your operations are.
[1:37:10]
It's very difficult to schedule this
[1:37:12]
committee meeting
[1:37:13]
>> and a lot of conflicts here. So, um, I
[1:37:16]
» and a lot of conflicts here. So, um, I
[1:37:16]
will look at alternatives, but for right
[1:37:18]
now, I'm going to have to hold this date
[1:37:20]
because it's very, very difficult to get
[1:37:22]
this committee together.
[1:37:25]
>> Okay. No.
[1:37:26]
» Okay. No.
[1:37:26]
>> Mhm.
[1:37:27]
» Mhm.
[1:37:27]
>> And so then, no public comment. Uh, and
[1:37:31]
» And so then, no public comment. Uh, and
[1:37:31]
there's committee review of public
[1:37:33]
comments because we're required to do
[1:37:34]
that. And then there's other business
[1:37:37]
and future agenda recommendations.
[1:37:39]
Anybody have an agenda item they want to
[1:37:41]
put down for next time?
[1:37:46]
And final round robin of comments.
[1:37:49]
Anybody want to do a summary comment?
[1:37:54]
Pat,
[1:37:56]
>> you know, Bayfield County kind of kept
[1:37:58]
» you know, Bayfield County kind of kept
[1:37:58]
theirs shorter and they had some kind of
[1:38:00]
nice display in materials and whatever
[1:38:02]
that seemed to have caught people's
[1:38:04]
attention more than the usual comp plan
[1:38:06]
updates. There's something to be said
[1:38:08]
for brevity. Um, I think Bayfield County
[1:38:12]
benefited from that.
[1:38:14]
You know, I grew up in Bayfield County,
[1:38:16]
still have land there, so I actually saw
[1:38:18]
more of what they did than what Ashlin
[1:38:21]
County did. Um, people don't read long
[1:38:24]
documents.
[1:38:27]
Revity is
[1:38:29]
>> Yeah, I concur with that observation.
[1:38:30]
» Yeah, I concur with that observation.
[1:38:30]
I'd really like to the city of Ashlin's
[1:38:32]
comprehensive plan. It's much uh
[1:38:34]
shorter, easier to read. So when we get
[1:38:37]
to boiling things down, we might might
[1:38:39]
consider that.
[1:38:41]
Other summary comments. If not, a motion
[1:38:44]
to adjurnn, please.
[1:38:47]
Charlie moves to adjurnn. Second.
[1:38:52]
Is that Gary?
[1:38:54]
Oh, Paul. Paul seconds. Okay. Second.
[1:38:58]
Okay.
[1:39:00]
>> And all in favor of adjournment I post.
[1:39:04]
» And all in favor of adjournment I post.
[1:39:04]
>> thank you everybody.