Agenda
Agenda: https://storage.googleapis.com/proudcity/belvedereca/2026/06/agenda-pc-2026-07-21-9e127171.pdf
Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
These are YouTube's auto-generated captions, not a human transcript — expect occasional errors, especially with names and technical terms.
[0:27]
[clears throat]
[0:31]
I now call to order the regular meeting
of the Belvadier Planning Commission.
[0:37]
We'll begin with item one, open forum.
Open forum is an opportunity for any
[0:43]
citizen to briefly address the planning
commission on any matter that does not
[0:47]
appear on the agenda. Comments are
limited to no more than three minutes.
[0:51]
Matters that appear to warrant
commission consideration may be
[0:55]
agendaized for further discussion at a
later hearing. Is there anyone in the
[1:00]
audience who would like to speak during
open forum?
[1:07]
Anyone on Zoom? Rebecca,
>> there's no one with their hand raised on
[1:13]
Zoom.
>> Okay, thank you.
[1:17]
We'll move on to reports. Are there any
commissioners who would like to provide
[1:21]
a report?
[1:26]
Staff reports.
>> Uh, I'd just like to quickly um
[1:32]
introduce our new planning commissioner,
Jacob Lanetski. We are thrilled that
[1:36]
you've joined us on the commission and
look forward to um your time on the
[1:41]
commission. Thank you.
>> Thank you.
[1:46]
Thank you.
Uh
[1:51]
any public comment and reports on city
hall? Well, um probably not. So,
[1:58]
» actually, I I'll just do sorry, one more
little quick update. We did I know
[2:02]
everyone's interested in the Malard
Point project. We did issue the
[2:05]
demolition permit on July 15th um last
week for that project.
[2:11]
» Oh,
>> thank you.
[2:13]
» Very good. Thank you.
We'll move on to consent calendar items.
[2:20]
The consent calendar consists of items
considered to be non-controversial
[2:24]
unless any item is specifically removed
by any member of the council, staff or
[2:29]
public. [clears throat] The consent
calendar will be adopted by one motion.
[2:33]
Items removed will be considered for the
sequence that they appear on the agenda.
[2:38]
Um, I will request that we remove the
approval of the minutes because we only
[2:45]
have two commissioners here that were
present at the last meeting.
[2:51]
» Um, does anyone else have any requests?
[2:59]
» So,
>> um, yes,
[3:01]
» sorry. Um, we received a uh a letter
from a neighbor with respect to u number
[3:09]
28 eucalyptus which was uh the uh the
new garage which was first approved in
[3:18]
September of 2022.
Um, and I didn't know whether um whether
[3:23]
we wanted to
re reopen the design review for that
[3:28]
based on the letter.
[3:32]
» Let's see the letter.
>> Staff is not familiar with this letter
[3:37]
if you don't mind.
>> It is here on our podium.
[3:40]
» Is it for 34 eucalyptus maybe?
>> Yeah, it's
[3:44]
» Oh, sorry. Never mind. I'm fine.
>> Okay. [laughter]
[3:51]
Thank you.
>> 28 34.
[3:55]
» Sorry. Sorry about that. Yes.
>> I I do words, not numbers.
[4:00]
» All right. Thank you. No, no need no
need to rem to remove number two.
[4:04]
» Okay.
>> From the consent calendar.
[4:06]
» Thank you for that clarification. So, um
with that, can I have a motion to adopt
[4:12]
the items on the consent calendar with
the removal of last meetings minutes?
[4:18]
Um, I'll make a motion to approve number
two on the consent on the consent
[4:22]
calendar.
>> Second the motion.
[4:27]
» All in favor?
>> I
[4:28]
» I
>> Thank you.
[4:31]
» Sorry to interrupt. Um, I didn't I was
wondering if there's any public comment
[4:35]
on the consent calendar item.
>> Well, let's uh let's back up. Um, does
[4:42]
anyone in the room have any thoughts on
the consent calendar?
[4:48]
There's no one on Zoom either.
>> Okay.
[4:51]
» All right. So, is the motion we made
okay or do you want us to retake it?
[4:55]
» It's okay.
>> It's okay.
[4:56]
» All right. Thanks.
[5:03]
[clears throat]
[5:08]
We will now move on to the public
hearing. Um, I believe we're going to
[5:13]
reorder the order that we hear the items
in. We're going to begin with
[5:21]
item five,
which is design review and use permit
[5:27]
for a dock expansion and boat lifts at
310 and 312 Beach Road.
[5:35]
Can I have a presentation from staff,
please?
[5:38]
» Thank you, Chair Cidle and members of
the planning commission. for your
[5:42]
consideration this evening is an
application for design review and use
[5:45]
permit to construct a dock expansion,
two boat lifts, kayak racks, and a shed.
[5:54]
Uh 310 and 312 Beach Road are located on
steeply slope lots on the eastern side
[6:00]
of Belvadier Island. On July 1st, 1989,
the city entered into a joint dock lease
[6:06]
with the then owners of both properties
to use and maintain their private docks.
[6:11]
Historically, a deed gate, fence, and
joint staircase provided access to the
[6:15]
dock. The stairs, which were in
disrepair, have since been removed due
[6:19]
to safety concerns. In March of this
year, the properties received planning
[6:23]
commission approval to construct a
shared elevator and landing within the
[6:27]
strip to access the property shared
dock. Approval was also received to
[6:32]
reconstruct the stairs and connect that
connect to the existing pier.
[6:41]
Staff has received many emails from
residents both in favor of the
[6:45]
improvements and not in favor of the
improvements. Given the comments
[6:48]
combined with the city's differing
opinions on improvements on the strip,
[6:52]
the applicant has decided to remove the
pla the wood platforms from the project.
[6:57]
The improvements that are under the
planning commission review tonight are
[7:01]
only the dock expansion, the kayak
racks, and the sheds. The revocable
[7:06]
license has been removed from the
project as well. The dock improvements
[7:10]
are subject to design review and the use
permit.
[7:17]
The 270 ft dock expansion is proposed on
the southern side of the existing dock
[7:22]
and will be constructed using composite
decking materials.
[7:28]
Two boat lifts are proposed on the
eastern side of the dock.
[7:35]
And the project proposes construction of
a 36q ft storage shed measuring 8'2 in
[7:41]
in height and two kayak storage racks
measuring 8 ft tall. The shed and kayak
[7:46]
racks would be would feature brown
composite shingle roofing and finished
[7:50]
with vertical redwood siding to match
the existing shed.
[7:58]
The dock, boat lifts, kayak racks, and
sheds are located on the water beyond
[8:02]
the strip in the recreation zoning
district. A use permit is required for
[8:07]
these components in the resident uh
recreation zoning district. As
[8:11]
mentioned, the city and then owners
enter entered into a dock lease
[8:15]
agreement. Uh the lease included several
provisions regarding permissible uses of
[8:21]
the dock relevant to this project. The
dock le states the dock may contain only
[8:26]
facilities constructed for the docking
and mooring of boats. For this reason,
[8:30]
staff has advised the applicant that the
proposed storage shed and kayak sheds
[8:36]
are not allowed because they are not
directly related to the docking or
[8:40]
mooring. However, staff advises that the
project may include kayak racks since
[8:45]
kayaks are considered boats and the
racks are equivalent to do the
[8:50]
equivalent of docking or mooring of
kayaks.
[8:56]
For the commission's consideration, the
applicant provided amendments and
[9:00]
additional information for the storage
rack and platforms.
[9:04]
First, the kayak storage racks would be
located on the ends of the dock and
[9:08]
rotated 90°.
[9:15]
The applicant has also provided two
additional rack kayak rack options for
[9:19]
the commission to consider in addition
to the current shed proposals.
[9:27]
And finally, the plans before you show
the wood landings being removed from the
[9:31]
strip circled here in red at the bottom
of the screen.
[9:38]
Uh staff recommends granting design
review and use permit approvals to
[9:41]
construct the two boat lifts, two kayak
docks without their sheds,
[9:46]
and the 270 foot dock expansion, all
within the recreation zoning district.
[9:52]
Thank you. And we're happy to answer any
questions.
[9:55]
» Thank you, Sammy.
Commissioners, um you like to ask
[10:00]
questions?
>> Yeah, I have a question. the um second
[10:03]
storage shed that is still part of the
application. Not the kayak storage shed,
[10:08]
but the matching
>> the 36 square foot shed, it is part of
[10:13]
the application. Staff is not
recommending approval.
[10:16]
» Okay. Thank you.
[10:20]
And um Sammy, when you said that the
wooden platforms have been have been
[10:24]
removed,
um what is going to I mean, is there
[10:28]
going to be any uh any construction of
anything on the on the strip? And how
[10:34]
does one get from the elevator down to
the dock if the wooden platforms are not
[10:38]
there?
>> Yeah, good question. Uh, Commissioner
[10:41]
Watson, if you remember in March of this
year when the elevator got approved,
[10:46]
» they also received approval for a
landing to get from the elevator down to
[10:50]
the existing um uh stairs. That stairs
was also approved to be uh reconstructed
[10:57]
in the same location. And so that's the
the design that the our applicant is
[11:02]
going to move forward with.
[11:08]
» And I have one more question. the um
uh the kayak the two kayak racks that
[11:14]
are proposed for approval or
recommending approval by staff. Is it
[11:19]
would that be the third option, the most
open option or
[11:23]
» the That's right. the third option.
>> Okay.
[11:39]
Uh maybe Sammy, could you just go back
to the um sort of the aerial that showed
[11:45]
the parcels?
[11:51]
» Um so the yellow rectangle um is that
that represents your understanding of
[11:57]
what we call the strip?
>> That's correct.
[12:01]
» Okay. Yeah,
>> I just wanted to clarify that it's, you
[12:06]
know, [snorts] it's kind of hard when
you're standing on site to tell there's
[12:10]
no fences or anything. Um,
[12:15]
and water. [laughter]
Um, okay. Thank you. Any
[12:23]
questions?
>> So, just to clarify, the improvements on
[12:27]
the on the strip itself are not an issue
here. Correct.
[12:31]
» Correct.
>> Okay. And the reason the staff is not
[12:36]
recommending the two sheds, one of which
is already grandfathered in, there is a
[12:41]
kind of a shed there already, right?
>> There is one shed there right now. Yes.
[12:45]
» Okay. And the reason the staff is
recommend is not recommending it is
[12:48]
because it does not neatly fit into
either the docking or the mooring
[12:52]
definition. Is that correct?
>> That's exactly correct.
[12:57]
And without the two sheds, would the
land owner then remove both sheds or one
[13:02]
of them is completely derelct? Would he
or both of them restore? What is the
[13:06]
plan then?
[13:12]
» Can you bring your mic a little bit
closer? It's hard to hear you.
[13:14]
» Sorry.
>> Thank you.
[13:16]
» Uh question. If if the if the sheds are
not approved,
[13:21]
what is the plan to deal with the
existing shed that is pretty derelictked
[13:25]
on the pier? [snorts]
>> The the existing shed can be repaired.
[13:30]
Uh but that would be the extent of the
the sheds that would be on the on the
[13:36]
dock.
[13:40]
» And if the owner were to build a second
shed, that would increase the square
[13:44]
footage of the dock. Correct?
No, the uh the the dock is being
[13:52]
proposed for an expansion. The shed
would be on the on the dock. So, it
[13:58]
wouldn't increase the square footage of
the dock itself.
[14:02]
» Okay. So, the dock is going to be
increased anyways by that 270 ft.
[14:06]
» Yes. And and that's primarily well it
partly for the boat lifts.
[14:10]
» Understood. Thank you.
[14:15]
Sorry, one one more question about the
shed. Um it you referenced in your um in
[14:20]
your report that there's a shed on a
neighboring dock.
[14:31]
[snorts]
[14:35]
» I'll have to let me go back in.
>> Okay. Thanks.
[14:44]
there.
[14:52]
» I can cover that.
>> Okay. And I and I guess I was
[14:55]
specifically wondering if there if the
neighboring dock had one or two sheds on
[14:58]
it.
[snorts]
[15:03]
» Thank you.
[15:07]
Another question for design review of
the um kayak racks. What's triggering
[15:12]
design review? Is it because they're
fixed or the height of them or what
[15:16]
specifically?
Why is it part of the design review?
[15:21]
» That's also a good question. I think it
was part of the design review because it
[15:24]
was more of a structure. At this point,
[clears throat]
[15:28]
you know, we require design review for
permanent structure structures. So, I
[15:32]
would assume there's some permanency to
a rack on a dock in the middle of the or
[15:39]
in the water.
[15:46]
» Okay. Um, any further questions or shall
we ask the applicant to present?
[15:53]
» Okay.
[15:56]
» Is that the same one?
>> Mr. Conro is the same.
[16:03]
» [clears throat]
>> have a question. I guess
[16:09]
Mark, are you ready to present?
>> Yeah.
[16:12]
» Okay.
[16:17]
[clears throat]
[16:29]
» The one at 503. Is that the right one?
>> I think I said
[16:34]
[clears throat]
to
[16:53]
Mark, does this one look right?
[16:57]
» Does this one look right?
That's it.
[17:17]
» Okay.
[17:26]
» [clears throat]
[17:30]
» promote.
[17:44]
» No, we'll do it for you.
>> But make sure that mic's on. Push the
[17:48]
button. So, it's green.
>> Okay.
[18:04]
and yeah, just start out with number
one. I'll go in order.
[18:08]
» Okay.
[18:22]
Yeah.
[18:30]
» Well, good evening and thanks for the
background music. Kind of makes me more
[18:35]
relaxed. Uh, my name is Mark Conroe. I
live at 310 Beach Road. I'm uh
[18:41]
representing the applicant. First of all
and foremost, maybe I want to thank
[18:45]
planning staff. I don't know if planning
commission knows, but you have some of
[18:48]
the best planning staff probably in the
country. I've dealt with a lot of
[18:53]
planning commissions and planning staff
and they're right up there. So, don't
[18:58]
lose them. Um, I think there's a couple
things in the staff report that I wanted
[19:03]
or not the staff report, the staff
presentation that I'd like to correct.
[19:07]
Um, the p the aerial is incorrect. So,
we'll get to that in a second. Where is
[19:13]
the strip? So, I'd basically like to uh
address four questions. What does the
[19:18]
general plan say about water usage in
the docks? What are we proposing? What
[19:23]
does the dock lease say about equipment
storage? And where is that darn strip?
[19:28]
The general plan consistently recognizes
that Belvadier's unique identity drives
[19:33]
from its intimate relationship with the
bay. It identifies maritime improvements
[19:37]
including docks, floats, and boat lifts
as an important part of the hundreds of
[19:41]
waterfront properties in town and
recognizes uh Belvar Cove where we front
[19:47]
as a important recreational resource and
seeks to preserve the city's unique
[19:52]
waterfront character.
So what are we proposing? As staff
[19:58]
pointed out, we had two pieces to our
proposal. One was the dock and two was
[20:03]
in the strip to add two platforms to uh
as part of our elevator improvements. Uh
[20:13]
clearly the whole issue of making
improvements in the strip is very
[20:18]
political politicized and so we are
advised a couple hours ago to pull that
[20:23]
from the application which we did. So
the only thing we're discussing tonight
[20:27]
are the dock improvements.
So, what are those dock improvements?
[20:32]
And again, we'll get to where the strip
is in a second.
[20:37]
We're proposing
to enlarge the existing dock that's been
[20:41]
there for over 50 years by 270 square
ft. This is only 120 square feet, more
[20:46]
than what was proved a couple decades
ago. This would result in the total dock
[20:51]
area of being 1,50 ft shared by two
homes. This is probably to my knowledge
[20:59]
the only dock in Belvadier which is
shared with two homes. Other ones it's
[21:04]
one dock one home. So this results in a
dock size per home of 525 square ft. And
[21:12]
I would contend it's the smallest dock
after we enlarge it in Belvadier. 525 ft
[21:19]
including all walkways.
We're also proposing a boat lift for
[21:23]
each owner. Let's talk about those kayak
racks and the um boat equipment storage
[21:30]
shed. There's one shed being proposed.
If you can go to actually if you if
[21:35]
you're are they seeing what's in blue is
what we're talk you can leave actually
[21:42]
that up for one second there Sammy
please. In blue is what we're talking
[21:46]
about. In red is the strip below that
red line is the strip. And I'll get to
[21:52]
the legal definition and our survey in a
second. Let's go to the next definition
[21:57]
or sorry, next page,
page two of the plans there. Nope,
[22:04]
that's not it. Oh, yeah. Okay. Actually
enlarged that a little bit. Uh you had
[22:08]
the old uh elevation. We were asked to
provide an elevation. That was what was
[22:13]
in the uh if you can make it smaller so
you can see there's two parts of that
[22:18]
elevation. Sammy, if you can There we
go. Keep going. Okay, perfect. That's
[22:22]
sort of the before and after. The before
was uh a week ago and the current is we
[22:29]
turned the only one change we made. We
turn the kayak racks 90 degrees.
[22:34]
One of the main reasons for doing this
was to clarify this word structures. Uh
[22:39]
you can see that there a single wall
with a roof um and they're see-through.
[22:46]
As you look from the beach or the bay,
you can see the existing shed and a
[22:50]
matching to be a proposed equipment boat
equipment shed. So that's what we'll
[22:54]
talk about in terms of boat use and we
can talk about the kayak racks too, but
[22:59]
they are covered and they match exactly
what the neighbor has except about a
[23:03]
quarter of the size. Let's go to the
next slide.
[23:12]
Okay, now make it a little bit smaller,
please. Okay. Actually, that's not I was
[23:18]
looking uh in the plans. If you can go
to the plans, the next slide in the
[23:22]
plans.
[23:29]
No, not just the plans. Number one,
sheet three of number one. Yeah. Okay.
[23:35]
If you you can scroll through the pages.
Okay. Go back one page. This gives it um
[23:41]
overall you can see the strip borded in
red and what we're talking about in
[23:46]
blue. And again I'll substantiate the
interesting on on Sammy's U slide. It
[23:53]
showed the correct legal description on
the left but the incorrect aerial on the
[23:56]
right. I talked to the title company why
that is and they said it's pictorial.
[24:00]
It's not meant to represent a legal
description. The legal description
[24:03]
represents the legal description which
is what we put on our survey which is
[24:07]
the lines shown in red. Those are
accurate to the to the edge. Let's go to
[24:11]
the next slide in this package, please.
Okay, this is on the left. A question
[24:18]
about uh is there something like this
nearby? This is a couple docks down the
[24:23]
two photos on the left. The photo from
the front of it and the photo from the
[24:26]
back of it that in blue lines it shows
the size of ours superimposed on the
[24:31]
their existing shed. You can see it's
quite a bit bigger. Um on the right just
[24:37]
are pictures of the existing boat
storage shed. If you can go to the next
[24:41]
slide, please.
Okay. And that's the elevation from the
[24:45]
beach. Again, the the package that uh
the presentation that Sammy showed had a
[24:50]
the the prior u picture of what it
looked like, but when we we just turned
[24:55]
these racks to open the Vista up. Okay.
If you can go to the the um number two
[25:02]
on my
uh list of slides, please.
[25:07]
That's all in that package there.
[25:13]
Yeah. Okay. This is simply to make the
point of the before and after of what
[25:18]
the Vista looked when we all we did is
shift the outer two structures which are
[25:23]
boat sorry kayak racks 90 degrees. You
can go to number three, Sammy, please.
[25:30]
So, again, we we're trying to open it
up. We're trying to address what we
[25:32]
think might be concerns. Let So, a
couple hours ago, Sammy asked me, "Well,
[25:37]
why don't you give me some examples of
more open kayak racks?" So, this was
[25:44]
done about two hours ago. The top is
what we're proposing. Um, and that's
[25:50]
what's on the plans. And it has a single
side to protect against wind, wind, and
[25:55]
a roof. And again, that's what's a
couple doors down. Um, ours is much much
[25:59]
smaller than that, but same idea. There
would be one for each user of the docks.
[26:06]
Two alternatives. Um, if we're going to
look at if you wanted to get rid of the
[26:10]
roof, you would have a single wall um
without a roof. And then the third one
[26:15]
down is a rack with no protection. The
issue here is you get strong winds that
[26:22]
blow across the bay and kayaks end up in
the bay uh and create hazards in the
[26:28]
bay. If we had to cut the baby in half,
I would opt for the middle option. Uh
[26:34]
and that is uh with no roof but just a
wall to uh both attach stuff to and to
[26:39]
protect against the wind. That would be
perpendicular to the beach. So as you're
[26:43]
standing in the beach, as our elevation
shows, except you would get it rid of
[26:49]
the roof. So you would just see this end
of a wall and the kayaks itself. So it'
[26:53]
be virtually invisible, but it would uh
help solve the problem. It also helps
[26:58]
solve the problem where to put the ores
because you'd strap those to the wall on
[27:01]
the bottom example. Uh I'm not sure
where they go. Uh I know where they
[27:06]
would end up in the bay on a strong
strong wind. So, uh, we would prefer not
[27:10]
to have the bottom option.
Okay. Uh, next. Um,
[27:16]
so let me I guess that's that is the and
I can entertain any questions about
[27:19]
those improvements. So, in summary, it's
uh two kayak racks, one for each of us.
[27:25]
Uh, and one boat storage shed. Uh, the
boat storage set seems to be on the
[27:30]
endangered lease species list. Now, in
terms of keeping it, staff's
[27:34]
recommending not keeping it. The only
thing I would uh ask is where do you
[27:39]
keep all the stuff? Life preservers,
ores, um uh anything you might want to
[27:45]
use with the boat. Uh so I guess it's
either in our living room or garage,
[27:49]
which is up the top of the mountain or
in the boat itself. Um so that would be
[27:56]
um because it's quite a trek to get down
the mountain. Uh so having a 4ft by
[28:01]
basically a storage shed that's smaller
than a ping pong table uh out there is
[28:06]
and again matching the one that's
already out there so it's easy to
[28:09]
visualize is what we were asking for but
u I understand if that's controversial
[28:14]
and uh
is uh forboden then then uh we want to
[28:20]
move forward so I guess that means you
take it off the uh off the list. Um just
[28:25]
real quickly about the dock lease. Um
the dock lease is not specific as
[28:29]
structures on a dock. It says really
just two things in the lease in two
[28:34]
sentences. That the dock is for private
recreational uses and for docking of
[28:39]
boats. And you heard staff say just a
second ago that the docking uh keeping
[28:45]
um docking kayaks is acceptable to them.
um not sure with or without walls or or
[28:53]
roof, but um but keeping boat equipment
in a storage shed is not acceptable. Um
[28:59]
so there, as I said, there's a practical
issue, but um I'm not really here to
[29:04]
fight city hall on on putting a storage
shed on this dock. So if that's uh
[29:11]
considered precedent setting, then I
think it comes out. Um,
[29:17]
so that is I just want to have one last
comment. If you could pull up the uh the
[29:22]
u the the um the APN map for the uh for
the strip. There's two attachments, two
[29:30]
PDFs. One's the APM map for the strip
and one's a our survey for the strip.
[29:35]
Could you pull those up, Sammy, please?
[29:40]
» Can you?
>> The first one you'll recognize. It's
[29:42]
just a bigger version of what Sammy
showed. in your presentation mark.
[29:46]
» Yeah, it's
>> Yeah, go to the slides.
[29:48]
» It's probably never Let's go here and
it's under
[29:54]
uh go under uh extra. That's a good
point.
[30:01]
» Yeah. Okay. Go for the APM map and then
the second one.
[30:05]
» Okay.
This is um public information. It's the
[30:10]
APM map. The thing to glean from this
very clearly, it's a legal description.
[30:16]
The strip is actually a legal parcel.
It's parcel 06. Every parcel that the
[30:22]
county has has a legal description. You
can see meets and bounds on this legal
[30:26]
description on this parcel. You can see
the same where our houses are. It's
[30:31]
actually very easy to plot the two. And
so all I've done in the next slide is
[30:36]
taken the the um the the the um the
survey that we did for the in both the
[30:44]
strip and for the homes right here and
overlaid that legal description the
[30:49]
piece that fronts us uh over there and
those are the green lines. So there's
[30:54]
the the strip ends just above the rip
raft. There's no question about this.
[30:59]
There's no evidence of anything else.
Unfortunately, there's that um
[31:03]
misleading errant aerial, but that has
no no legal bearing on anything. It's
[31:10]
the legal description for lots that
dictate where lots are, and that's where
[31:15]
the strip is. So,
um I don't think there's any question,
[31:20]
and I'm happy to entertain any other
legal descriptions that may be found of
[31:25]
the strip, but that's the only one that
exists.
[31:28]
So I'll and I I'll I'll end in this and
this was I think in the packages we got
[31:33]
neighbors sorry letters of support from
all the abuing neighbors that literally
[31:39]
the ones that abut on each side of us
and then other one others on the street.
[31:43]
So there is support for this and uh I
think that's an important part of the
[31:47]
proposal. Um I think that's it and I'll
entertain any questions. Thanks for
[31:52]
bearing with me.
Would
[31:58]
any planning commissioner like to ask
questions of the applicant?
[32:06]
» Hi. Sorry to uh take us away from the
thrilling conversation about kayak
[32:10]
racks. Um can you tell us about the
lighting that's planned for the dock?
[32:16]
» Sure. And staff made in their staff
report of recommendation which I'm fine
[32:20]
with. And we have the most uh
unobtrusive lighting you can put in
[32:24]
those little puck lights that are, you
know, one inch diameter that are flush
[32:30]
mounted with the docked so you don't
walk off the end of the dock. Um and I
[32:35]
think they said, "Hey, there's instead
of 30, I think the numbers were we put
[32:39]
architect put 32 on there and they said,
let's put 20 on there." Um that's not a
[32:44]
uh a key issue to us. So staff can adopt
whatever they want with doc with respect
[32:51]
to the dock lights. Importantly, they're
not it's not light pollution. Other docs
[32:55]
have, you know, basically search lights
out there and these are just puck lights
[33:00]
so you can see where [clears throat]
you're walking
[33:02]
» and they're and they're shielded from
the top. They're not shining straight
[33:05]
up. Correct. Like like you see in the
photo here.
[33:09]
» Yes. That we would Yeah, that's that
represents what we're planning to do. So
[33:13]
yeah, you Yeah, exactly.
Okay. So about how many feet do you have
[33:20]
in between them?
>> Well, the architect put there I would
[33:24]
say there's about six feet or
>> Okay.
[33:27]
» 6 or 8 feet between them now. And it may
if you reduce them by 40% they'll be 10
[33:33]
or 12 feet apart.
>> Okay. Great. Thank you.
[33:42]
» Any other questions? Could
[33:52]
I make one further comment?
Oh, yes. Okay. And I I just and I'm not
[33:58]
going to bore you with my pictures of
high tide, but and it's largely
[34:04]
unrelated and irrelevant to the
proposal, but um just for the record, we
[34:10]
support the public's use of the beach.
And to the extent it's accessible, which
[34:15]
it isn't at high tide, and we have some
photographs that show the water against
[34:19]
the rip raft, um we're we're all good
for that. It's not on It's not on the
[34:25]
strip, but it's um again, there's been
some talk about uh public use of the
[34:30]
beach and and what we're doing doesn't
change that at all.
[34:35]
» Thank you.
>> Thank you.
[34:39]
» Go ahead,
>> Mark. So, in terms of the racks, the
[34:43]
kind of the three possibilities here,
um, I understand, you know, your point
[34:48]
about the third one, the lowest one
being not ideal, but you could still do
[34:51]
some kind of a strap-on system, right,
where you strap in the kayaks and you
[34:55]
would strap in the ores. Is that still
possible or is that
[34:57]
» Yes, that would certainly be the backup
plan. Um, to if you had an open
[35:02]
structure like the bottom picture, then
the wind the the problematic direction
[35:07]
is north south basically. Um uh 80% of
the time the wind comes from Pacific
[35:13]
Ocean. We're on the backside island.
That's why Belvadier built their houses
[35:16]
there first because it was a better side
without the view of San Francisco of
[35:20]
course. But but the wind comes from
Mexico or Alaska about 20% of the time
[35:24]
or 10% of the time and it can get
howling. Someone asked what happened to
[35:28]
our g our gang way that was ripped off
in a storm and actually all the damage
[35:34]
you see to the existing dock was done
last November. So it actually looked
[35:38]
much different before you had three-foot
waves cresting and taking the walkway
[35:43]
down. So that that's the event that I'm
trying to protect against where you get
[35:47]
50 mph winds blowing across the dock and
taking things with it. So but certainly
[35:53]
we either go grab everything off and try
to bring it up the hill into the house
[35:58]
up to the top of the mountain or we uh
strap it down and go fishing afterwards.
[36:04]
Thanks.
[36:08]
[clears throat]
I think the commission is finished with
[36:12]
its questions. So,
would any member of the public like to
[36:17]
speak regarding this item?
[36:31]
Sandy Donnell, 137 Golden Gate Avenue,
Belvadier.
[36:36]
And um I guess I'm curious about what
the point of like talking about the
[36:41]
strip and the water and the waters not
being part of the strip. That's one of
[36:44]
my first questions. And then I just want
to make sure that everybody's aware that
[36:49]
not only if if any of that land does
become privatized in the agreement
[36:55]
between the um when the when the
property was conveyed to the city of
[37:00]
Beler by the land company in
what 1896
[37:05]
it was if anything is um if we don't set
up live up to the covenants that they
[37:11]
have um agreed to then it reverts to the
Belvadier land company. So that is at
[37:16]
risk that the Belvadier land company is
entitled to take all that property back
[37:21]
if the city um abuses that. And then um
you spoke about the um so the revocable
[37:28]
license. So how is the elevator coming
down if there is no revocable license?
[37:35]
» Um maybe staff can answer that.
>> I mean maybe you can't answer because
[37:38]
I'm just a person talking. But
>> do you want me to answer?
[37:42]
» Yeah. Yeah. Okay. Yeah. The uh planning
commission approved those a few months
[37:48]
ago and it has not gone to city council
yet.
[37:51]
» But so there is a revocable license.
>> It has not gone to city council for a
[37:55]
revocable license yet.
>> But that's possible.
[37:58]
» It Well, yes, it will go.
>> So then, okay, it will go. Well, I
[38:01]
didn't bring my little picture here, but
you've all had it where if you see, then
[38:05]
it's giving away almost as much land to
a private parties as the land in their
[38:10]
their ownership ex, you know, in their
own lots, existing lots. So, I I think
[38:15]
that would be very irresponsible the
city, but avoable license is still
[38:19]
supposed to be open to um the public.
You can't privatize. You can't cut it
[38:25]
off and make it part of your yard. um it
still is something that can be used by
[38:30]
the um by the public. That's my
understanding. When I was on the city
[38:33]
council when we looked at um revocable
licenses, that was one of the um one of
[38:38]
the strong findings. And I'm going to
run back and get my little picture for
[38:42]
you. Just a sec.
>> Sure.
[38:48]
» Um can I
can I ask a question? I had thought that
[38:53]
there was a revocable license for the
existing stairs that or I guess the
[38:59]
pre-existing stairs
[39:06]
» in in 2022 310 Beach received a uh
recommendation for approval for a
[39:14]
revokeable license for his own stairs to
come down to the shared dock.
[39:20]
Is it?
>> But I I had thought that the stairs that
[39:23]
used to be there
had a revocable license associated with
[39:28]
those stairs
[39:33]
» on 310 beach or 3.
>> When we discussed this having to do with
[39:38]
with the with the elevator, it was my
understanding that there was a revocable
[39:42]
license that was associated with the
stairs. The elevator was in essence
[39:46]
replacing
>> there. at at uh Mr. Conro's property,
[39:52]
there was a revocable license on his
property to get down to the stair uh to
[39:58]
the stairs from his side of the
property. Um that revocable license in
[40:03]
March
replaced all revocable licenses in the
[40:08]
strip
before then before that one. So any any
[40:14]
revocable license that was approved
prior in the strip was no longer
[40:23]
and and the one that went in 2022 it was
recommended for approval by planning
[40:28]
commission Mark I don't recall that it
went to the city council
[40:34]
license.
>> So he had a revokeable license for that
[40:36]
stairs.
>> Okay. Thank you.
[40:44]
I'm back when it goes to the city
council.
[40:49]
» So, if I can just clarify, is there is
there an auto revokable license now?
[40:58]
» [clears throat]
[41:08]
» But the one that I think was mentioned,
[41:17]
» so um if you could just give us one
minute. I think we are just double
[41:21]
checking our records down here.
>> Thank you.
[41:23]
» Thank you, Commissioner.
Could [clears throat] I make a because
[41:27]
this is of course Chris I've researched
it heavily a couple quick uh comment on
[41:32]
the revocal license which of course city
council is their perview but um for 50
[41:38]
years we had one for the stairs that
were there in 2022
[41:43]
that was uh I was granted one for the
stairs and that's in place now. If the
[41:49]
one that's going next month to the
council gets approved for the elevator,
[41:52]
that would replace the one for the
stairs. As far as the um the use of the
[41:58]
strip, we we're dramatically reducing
what's been done historically. It was
[42:02]
and I have an exhibit for this. I didn't
think we'd be discussing this because
[42:05]
it's a city council matter, but we were
about 6 or 700 square feet for 50 years.
[42:11]
The stairs are about 5 to 600 square
feet of impact area on the strip and
[42:16]
currently we're about 230 square feet
for the hill elevator. So, and I have a
[42:20]
a exhibit that shows all this. So, that
we've reduced in half our impact of
[42:24]
what's been going on for 50 years. It's
the exact opposite of what people are
[42:28]
suggesting that we're getting more land.
We're actually giving up a lot more
[42:31]
land. Even if we had the platforms
approved, it' be 30% less than what I
[42:36]
already have a revocable license for.
Platforms don't get approved in a month.
[42:40]
It's 50% less than what I currently have
in my hand in terms of a revocable
[42:45]
license. So again, we're trying to
reduce our impact on the strip. We're
[42:50]
giving back land that's been used for 50
years. So that those are the facts
[42:54]
around the revocable licenses.
>> Thank you.
[42:59]
We'll wait for a moment for um staff to
catch up with any
[43:05]
» There's an existing revocable license
for 312 beach for landscaping.
[43:11]
Um I'm pulling up in 2022
[43:17]
there is a
the [clears throat] stairs were part of
[43:22]
a revocable license.
I don't I don't have that recorded, but
[43:28]
I can go back to the minutes of that
meeting and see if it was approved.
[43:38]
[snorts]
[43:45]
So, will the
landscaping license for 312 remain in
[43:52]
place or is that going to be
replaced by this new
[44:02]
» Yes. My understanding of Okay, so we're
talking about the revocable license.
[44:06]
Now,
my understanding of it when it goes to
[44:10]
the council, it will be for the
landscaping for 312, the entirety of the
[44:16]
strip. So, both those property owners
are willing to take on responsibility
[44:20]
and liability for the entire strip. If
you draw imaginary property lines down
[44:25]
their pro down the hill towards the
water at the edge, it would stop. And
[44:31]
they they both have communicated to us
that they're willing to take on that
[44:35]
liab liability and responsibility.
[44:45]
That may be I mean it I'm not exactly
sure how that dovtales into our
[44:50]
deliberations tonight, but it's probably
a very good point for us all to be aware
[44:55]
of and I think it'll be clarified when
it goes if it if and when it goes to
[45:00]
council um for consideration at the
replicable license stage. Um, I'll just
[45:06]
note there haven't been any landscape
proposals for either lot
[45:14]
as in front of either lot on the strip.
Um, and I imagine if um there were an
[45:22]
intention to do landscaping there as
opposed to maintenance and debris
[45:26]
collection, we would see a plan. But we
haven't seen one today.
[45:38]
Are there any other comments from the
audience? Please come forward.
[45:48]
» Hello, I'm Charlie Harrington. Oh,
should I wait for the timer?
[45:53]
» Anyway, I'll I'll start. I'm Charlie
Harrington. I'm chair of the Belvadier
[45:56]
Parks Open Spaces and Lanes Committee.
Um, on this matter, I've been engaged uh
[46:01]
with city staff. Um, a couple months
ago, I met with city staff, a council
[46:05]
member, and a homeowner at the site. Uh,
we reviewed and discussed what seemed
[46:08]
like a great project, which was to add
the elevator, repair the existing
[46:12]
damaged dock, and improve pedestrian
access on the beach underneath the dock,
[46:16]
which was awesome. Um, but the project
has ballooned since then. I've written
[46:19]
two letters. Um, hopefully you've seen
those. Um, so I was going to talk about
[46:24]
two things. It does look like the
shoreline decks have been removed from
[46:26]
this proposal. That was one of the
things I was going to bring up, but um
[46:29]
otherwise I'll talk about the building
of the uh additional dock. So the
[46:33]
Belvadier general plan was brought up
earlier. I reviewed it when I joined
[46:37]
Parks Open Spaces Lanes. And there's an
exhibit, exhibit 3 is the land use map.
[46:41]
It's this colorful map showing what what
everything is. And the general plan that
[46:45]
map clearly shows that the waters of
Belvadier Cove are open space. Um so in
[46:50]
the staff report, it they're contending
the new dock would be in the R zone,
[46:54]
city's recreation zone. Um, so there's
there's some ambiguity there. So I just
[46:59]
highlight that for your attention. Um,
and then in the staff report, it talks
[47:03]
about the term of private recreational
land use as an acceptable way to get a
[47:06]
use permit. And in that same map, which
of course I don't have in color, uh, I
[47:10]
don't have a color printer, but there
are three locations in Belvadier where
[47:14]
you can have private residential land
use. It's on that map. They are the two
[47:18]
yacht clubs and they are the homes along
the water on Corinthian. I think those
[47:23]
homes interestingly own the water uh
underneath or own the land underneath
[47:27]
the water right there. But beyond that,
the general plan doesn't show any other
[47:30]
private recreational land use. So, I
wanted to highlight that. Uh, of course,
[47:34]
there are the grandfathered in private
recreational docks. It's my
[47:38]
understanding the city has not approved
uh another dock being construction since
[47:41]
the 80s. So, I just reminding like what
this project is. Um, you know, repairing
[47:46]
the existing dock is one thing, but
expanding and doubling the size of that
[47:49]
fixed dock, effectively building a new
dock, which the city has, as far as I
[47:53]
know, hasn't done in many years. Um, so
yeah, the original project of a hill,
[47:58]
existing dock repair, and improving
pedestrian access under the dock. No
[48:02]
issues with that. And again, I
appreciate the engagement uh that we've
[48:05]
had so far, but I just uh think about
the precedent of giving away the city's
[48:09]
public zones open and recreation for
private benefit. Thank you.
[48:14]
Thank you,
>> Chair Cidle. Just for your uh
[48:19]
consideration, we did find the 2022
revocable license which was executed uh
[48:24]
at 310 Beach Road. It included a new
staircase, landing, and landscaping.
[48:30]
» Okay.
>> And and is so is that already repealed
[48:36]
or is that still in effect until
something supersedes it? That's still in
[48:40]
a
>> Yeah, that revocable license is still
[48:43]
recorded on the property. Um, so it
would could be repealed assuming this
[48:49]
project goes forward to city council.
Uh, but then there could be some
[48:52]
potential for harmonizing the two
revocable licenses given that this 221
[48:57]
references landscaping. I don't think
that would be disturbed, but obviously
[49:01]
the stairs and such could be impacted.
>> So we would need to harmonize them
[49:05]
assuming this project goes forward.
>> Okay.
[49:06]
» Thank you.
Okay. Anyone else? Uh, I'm I'm I'm
[49:12]
letting members of the public comment
right now, Mark. Um,
[49:18]
Rebecca, is there anyone on Zoom who
would like to say anything?
[49:21]
» There are no hands raised.
>> Okay. Um, Mark, if if you have one very
[49:26]
brief comment,
>> very brief comment because there is
[49:29]
» there is the staff report correctly
identifies recreation zone versus open
[49:33]
space zone. The general plan is
confusing, but but Mr. variance because
[49:38]
it shows open space all the way to um to
Angel Island. So it's logical conclusion
[49:44]
is that uh parks and open space can
regulate things all the way to Angel
[49:48]
Island. If you look at the current
zoning map, it clearly shows open space
[49:53]
is the hillside, the strip, and
recreation is the beach and the water.
[49:57]
That's the zoning map. Uh city staff pre
presented that to me this week. So I
[50:03]
think the general plan needs to be
amended to be consistent with the
[50:06]
current zoning map which is the hillside
is the open space. The strip the beach
[50:12]
and the bay are recreation zone not
perview of the um parks and open space
[50:19]
people. Thanks. Okay. Thank you.
[50:25]
So, I'm going to just give one more
opportunity if anybody wants to say
[50:29]
anything before I bring this back to the
planning commissioners.
[50:37]
Having said that, I will now close the
public hearing and bring it back to the
[50:42]
commission for discussion. Um, Jenna,
could you please lead the discussion?
[50:50]
» Sure, I'm happy to. Um, with uh your
permission, I'd stand up. I threw my
[50:55]
back out this past week and uh it was a
little bit painful to sit, so I'm just
[51:00]
going to I'm just going to do this.
Sorry. Um, [sighs and gasps] it's much
[51:05]
better. Um,
uh, first first of all, I want to I want
[51:09]
to say thank you both to the both to the
staff and to the homeowners and also and
[51:13]
also to, uh, to Charlie Herring to
Harrington. Um this has been a a project
[51:18]
that we've discussed a couple of times
and I think there's a lot of real
[51:22]
thoughtfulness uh that is sort of all
you know all all around on on all on all
[51:27]
aspects of it. Um as some of you know I
actually used to be chair of the parks
[51:32]
open spaces and lanes lanes commission.
So, I am I'm I'm very attuned to the
[51:38]
public access um issues um especially
with the beachfront properties and some
[51:43]
of the coordination that it takes uh
with the homeowners and um and the and
[51:48]
the com and the commission. So, thank
you. Um, one thing that that I that I
[51:54]
like about this this uh project is that
it's, you know, it's actually getting
[52:01]
the homeowners to to be able to use
their waterfront. One thing that I find
[52:05]
amazing about Belvadier is that we're
surrounded by water, yet the access to
[52:11]
the water is almost nil. I mean, when
you think about the the ways that the
[52:15]
public can access can access the water,
it's really difficult. I mean for for
[52:20]
those of us who don't live on and and
for those of us who live on the water um
[52:25]
and uh the reason why I had asked about
the revocable licenses because I think
[52:29]
that one of the things that makes
Belvador so great is that we do have um
[52:35]
as you know we do have the strip is we
do have access that's built into
[52:42]
um our land our land records for the for
the public and that's something I'm very
[52:47]
interested in. um in um in keeping um
one one thing that I want to point out
[52:55]
is that you know there there's two
different sections to you know to what
[53:01]
we're looking at. There's the there's
the strip which I appreciate that
[53:04]
there's no building that's happening in
the strip now and that is in the other
[53:09]
building that's being covered by it is
is already covered by a revocable
[53:13]
license which is why I asked about that.
And then the dock itself, which in
[53:18]
looking at the plans, there are going to
be
[53:27]
six new pilings that are that are that
are going to be dug and I appreciate the
[53:31]
amount of work that's been done by the
um we call it the seafair seafaring
[53:37]
agencies um to approve that. I don't
really have that much of an opinion with
[53:44]
respect to
the kayak racks. I mean, I've seen
[53:49]
enough kayaks blown around. Um, and I
can't get that excited over whether a
[53:56]
kayak rack has a wall or a roof or
[laughter] no roof and no wall. So, I
[54:02]
will leave that to other members to talk
about. Um,
[54:08]
but I I do appreciate that this is a
unique project for the expansion of the
[54:15]
dock because it is shared by two houses.
Um and I think that the plan in its even
[54:22]
though it is enlarge enlarging the dock
considerably
[54:27]
does serve to not not
require putting a new dock in for you
[54:34]
know for the other for the other
homeowner and that they are sharing a
[54:37]
dock. And I find it amazing that in this
community that two homes next to each
[54:42]
other have been able to share a dock for
so long. I think that's testament to our
[54:45]
community quite frankly. Um
so
[54:51]
um
[54:55]
oh what is the expiration of the lease?
[55:01]
» 25 years
>> I think it's 39.
[55:07]
Okay.
>> And and there's no proposal right now to
[55:10]
extend that?
>> Not to my knowledge.
[55:13]
» Okay. Thank you.
Um,
[55:20]
all right.
That's my comments right now. Thank you.
[55:25]
I'm just going to continue to stand.
>> Okay. Permission granted.
[55:30]
Uh, is that please?
>> Yeah. Thank you. Um, I'd just like to
[55:34]
thank the applicant and other members of
the public who spoke. Um, uh, I really
[55:39]
do appreciate your efforts in working
with the staff on this project. I have I
[55:43]
spent a lot of time uh reading through
all the details and it's very thoughtful
[55:47]
application. Um I and I appreciate the
comments about the general plan. I think
[55:52]
it's really important to open up access
to the water and recreational uses. Um,
[55:57]
however, I do think that the planning or
the city staff's uh interpretation of
[56:04]
the lease terms is um is something that
I will that is guiding this project as
[56:11]
well in terms of the storage not uh
really being allowed under the lease. um
[56:17]
you know that the dock expansion um I
think I agree with the uh recommendation
[56:23]
that it um it's in keeping with other
docks in the area. It's not oversized.
[56:28]
You know, the materials are all
compatible. Um and I think it's
[56:32]
consistent with the Rzzoning district as
well. Um, as far as the storage racks
[56:38]
for the kayak, um, I do again think that
while I appreciate, uh, the general plan
[56:47]
provisions, I do think that the, uh,
lease provisions are the more
[56:50]
restrictive here. And I think that the
the more open kayak rack seems more
[56:56]
appropriate. Otherwise, it becomes more
of a storage structure, which according
[57:00]
to staff um interpretation of the lease
um wouldn't be permitted. And again, um
[57:06]
I do uh think that the reduction in
lighting on the dock as proposed by
[57:12]
staff would be appropriate as well.
Thanks.
[57:18]
» Thank you.
Uh Jacob, can we have you weigh in on
[57:23]
this now? Uh
>> yeah. I
[57:26]
I second the comments uh that have been
made and thank you to Mark and others
[57:31]
who have expressed their views here as
well. Um
[57:35]
I come to it from I guess a very similar
perspective which is we have a pretty
[57:40]
derelict dock right now and it's almost
it's really an eyesore for pretty much
[57:45]
everybody involved and there's a plan to
fix it to renovate it um slightly
[57:51]
enlarge it in a way that I think will
add to the aesthetic appeal and in
[57:56]
essence the public benefit
there. So, for me, that's um an
[58:00]
important factor. As regards the rack,
um I'm of the opinion that you should
[58:07]
strike a balance between what's most
utilitarian, but also provides for the
[58:10]
safety. I don't think it's good for any
kind of plastic debris to be blown away
[58:14]
and floating in the bay. So, uh Mark, I
think you've expressed the opinion that
[58:20]
the second version is probably the one
that will provide that medium of safety,
[58:24]
but also of least intrusiveness.
I'm fine with that design. I think it
[58:29]
strikes an appropriate balance.
Um, that's my opinions.
[58:36]
» Thank you.
[58:42]
Um, there has been, I would say, a lot
of work on this application. I
[58:48]
appreciate staff. I appreciate the
applicant and community members. um
[58:56]
parks, open space, and lanes input. Um
I've tried to diligent diligently read
[59:03]
and reread it all and read the deeds. Um
I think it's a uh it's been an
[59:09]
interesting um application to study
because it really touches on four
[59:15]
different parcels. Um, and there's, you
know, information going back all the way
[59:21]
to the 19th century to take into
consideration here. Um,
[59:27]
and I I
um, I should disclose I've had numerous
[59:31]
conversations with Mr. Conroe in the
course of this um, sort of trying to
[59:36]
navigate the best course. Um, I feel I I
share with um, fellow commissioners. I
[59:42]
think we're on a pretty good course here
now. Um the way during my admittedly
[59:49]
somewhat limited years on the
commission, we have had [clears throat]
[59:53]
several of these applications related to
docks and transiting across the strip.
[59:58]
And I think so far um my impression is
that the idea even though it's not
[1:00:05]
specifically mentioned in the deed that
if you have a dock, you got to have a
[1:00:10]
way to get there. And so um that's what
this application has now not so clear
[1:00:17]
that you know expansions beyond that
within the strip are a good idea. So I
[1:00:24]
feel it's a clean application now um
with with the removal of the platforms.
[1:00:30]
Um and then um I go out to the the dock.
Um, I feel this [clears throat] is a
[1:00:38]
probably a pretty unique situation in
Belvadier where two properties are
[1:00:42]
sharing one dock. I think
given that it's a unique situation, I
[1:00:49]
can understand why each homeowner would
essentially want to have a place for
[1:00:53]
their own boat and lift. And I don't
think the docks are excessively large.
[1:01:00]
So, um, I would be able to find in favor
of the dock. So, when you get to the
[1:01:07]
discussion of, you know, the things on
top of the dock, um, [clears throat]
[1:01:14]
you know, I'm inclined to go with the
staff interpretation, I think. Um, but
[1:01:20]
partly because in my own mind, given
that the dock is in an open space zone,
[1:01:25]
I think having less structures on it is
consistent with the idea of an open
[1:01:31]
space. I mean, it's basically a
horizontal plane with a railing. You can
[1:01:35]
mo a boat there. Um, it's not
obstructing the views of the open space
[1:01:40]
and there are people using the beach who
want to look out. Um, so
[1:01:46]
again, I appreciate the offer to remove
the shed. So that kind of leaves us with
[1:01:52]
the kayaks. Um, I I I think it's got to
be either image two or image three. And
[1:02:02]
bear with me for a minute minute while I
vacasillate here. Um, I think that
[1:02:10]
properly
uh secured
[1:02:14]
it and probably has to be significant
strapping or something. I think that the
[1:02:19]
kayaks themselves are weatherproof. They
don't need cover. Um,
[1:02:24]
how a freestanding wall is going to
perform, it's a little hard for me to
[1:02:29]
predict
um whether it's going to add that much
[1:02:33]
safety. So, I guess I'm inclined to go
with just the rack. Um, and I would add
[1:02:41]
though as far as I'm sensitive to what
Mr. Conroe brought up about lugging
[1:02:47]
everything up to the house. You do want
to have storage for life preservers and
[1:02:52]
paddles and so forth in a secure way.
But I um there are there are
[1:02:57]
pre-fabricated bins that are of a lower
height that to me would be acceptable.
[1:03:03]
They may not even have to be part of
the,
[1:03:07]
you know, whatever findings we make
today because I think they're um, you
[1:03:12]
know, not necessarily a fixed structure.
They would be attached to the dock so
[1:03:17]
they didn't blow away, but um to me that
would be acceptable because they would
[1:03:22]
be sort of more in the height range of a
railing. So less view obstructing but
[1:03:28]
sort of solve the storage problem which
I think is um a legit a legitimate
[1:03:34]
desire. Um so I I think that's
pretty much how I come down on it.
[1:03:55]
Does does anyone have anything further
to say or um are we It sounds like we're
[1:04:00]
relatively consistent. Someone wants to
take a stab at making a motion.
[1:04:05]
» Do you want the lawyer to do it?
>> Okay,
[1:04:08]
» I'd appreciate it. Sure.
[1:04:20]
All right. Um
like to propose a motion to adopt the
[1:04:24]
resolution granting design review
approval to construct two boat lifts,
[1:04:30]
two wood landings, and a dock extension
for the properties located at 310 and
[1:04:36]
312 Beach Road with the
>> excuse me.
[1:04:41]
Not not the woodlandings.
>> Oh, sorry. Not the woodlanding. Sorry.
[1:04:44]
Yep.
Adopt a resolution granting design
[1:04:48]
review approval to construct two boat
lifts and a dock expansion for the
[1:04:53]
properties located at 310 and 312 Beach
Road with the following requirements.
[1:05:00]
There be a reduction in the number of
lights as uh as as discussed.
[1:05:08]
that the kayak racks be rack number
[1:05:15]
» three
>> be rack number three in the in the
[1:05:19]
photos that were shown.
um that the new shed proposed is not is
[1:05:27]
not approved [gasps]
and that the public access is main is
[1:05:34]
maintained um along the beach in the
same degree as currently exists.
[1:05:41]
» If I could just clarify the motion if
you don't mind commissioner.
[1:05:44]
» Go for it.
>> Yeah. So the the shed is not before you.
[1:05:47]
It's no longer part of the application
given the duck lease. All right.
[1:05:51]
» Right. And then I believe you at the end
addressed maintenance. Is that what I
[1:05:54]
heard?
>> No, no, no. Public access.
[1:05:56]
» Oh, public access. Okay. Uh, that's not
part of design review.
[1:06:02]
» Okay.
>> But if that's something that's you
[1:06:05]
nonetheless want to address, that's
okay. But it's not technically a design
[1:06:08]
review criteria,
>> right? We're on the designer edge view
[1:06:13]
resolution
>> and it's not that that's not part of the
[1:06:17]
project that so it's do you have the
peer they're just rebuilding that but so
[1:06:24]
and that sort of [clears throat] relates
more to the revocable license.
[1:06:28]
» Okay. All right. Then we can take we can
if it if that's not
[1:06:35]
if that's if if what's before us isn't
isn't covered by the area that that the
[1:06:40]
public
walks.
[1:06:43]
» Right. We're not addressing any
improvements on the street.
[1:06:46]
» All right. All right. So we have
lighting
[1:06:51]
rack number three.
That's it.
[1:06:55]
» Yes. Thank you so much, Commissioner.
>> All right.
[1:06:58]
Okay. Do you want me to rephrase?
>> I think we have it. Unless anyone else
[1:07:03]
up on the DIS would like a read, a
further read.
[1:07:08]
» Can it be read again?
>> Of course.
[1:07:11]
» Right. Um, I'd like to propose a a
motion to adopt the resolution granting
[1:07:17]
design review approval to construct two
boat lifts and a dock expansion for the
[1:07:22]
properties located at 310 and 312 Beach
Road with the requirements that there be
[1:07:28]
a reduction in the overall lighting on
the dock as discussed in this meeting
[1:07:33]
and that the kayak racks be of the sort
shown as rack number three in the in the
[1:07:41]
photos. is pres presented at this
meeting.
[1:07:45]
» Perfect. Thank you so much,
Commissioner.
[1:07:49]
» Okay, we'll [clears throat]
please vote. All in favor?
[1:07:54]
» I
thank you.
[1:08:11]
All right. Um
and then we have another motion. Okay.
[1:08:17]
Um, adopt. I would like to propose a
motion adopting resolution granting the
[1:08:22]
use permit approval to expand the
existing fixed dock the city-owned water
[1:08:27]
parcel within the R zoning district
adjacent to 310 and 312
[1:08:34]
Beach Road.
And I'd like to add subject to the
[1:08:41]
existing lease or something where I
reference the fact that the use of the
[1:08:45]
dock is covered by the lease with the
city.
[1:08:49]
» Yes, I think it's fine to reference or
include subject to the existing dock
[1:08:53]
lease.
>> Okay. Um subject subject to the exist to
[1:08:57]
the terms and conditions of the existing
doc lease.
[1:09:06]
Uh
yes, you can.
[1:09:10]
» Is the dock lease co-terminus with a
revocable license?
[1:09:15]
» No, not necessarily. So that's a very
good point. So the doc lease, as
[1:09:18]
referenced before, is set to expire on
June 30th, 2039. Revocable leases do not
[1:09:23]
necessarily have a term,
>> although something that the city council
[1:09:27]
could conceivably incorporate, but they
don't always have a term.
[1:09:32]
So it is something that we should
probably look into in that the two
[1:09:38]
documents should be co-terminous, right?
Because you can't really have a dock
[1:09:43]
without the revocable license that
allows for the access to the dock.
[1:09:46]
Correct.
So
[1:09:51]
» isn't the revocable license covering the
strip of land?
[1:09:54]
» Mhm.
>> And the strip of land is where the
[1:09:56]
elevator and the stairs are. Without the
strip of land, without that elevator and
[1:10:00]
the stairs, you cannot access the dock.
Is that correct? Logically correct? Yes.
[1:10:04]
» Yeah. Yeah. Yeah.
>> So therefore, the two the revocable
[1:10:07]
license and the lease, the dock lease
should have the same term, the same
[1:10:11]
length would be my advice on that.
Otherwise, you can have a situation
[1:10:17]
where one expires or one is revoked, but
the other one remains
[1:10:22]
» and the land owner may have other other
remedies for it, but I don't think the
[1:10:26]
city would want to engage in those.
Yeah, that's a very good point,
[1:10:28]
Commissioner. We can certainly raise
that with the city council when they
[1:10:31]
consider the revocable license.
>> Thank you.
[1:10:33]
» Thank you.
[1:10:41]
» I think we need a second. Second motion.
>> Please vote. All in favor?
[1:10:48]
» I
[1:10:51]
» Thank you.
[1:10:55]
And then we do not have a motion.
>> We don't need the third one. Okay.
[1:11:00]
» All right. I think that concludes this
item.
[1:11:15]
Okay. Uh we are now going to return to
our regularly scheduled program. Uh, and
[1:11:22]
I will open the hearing [clears throat]
on item three, design review for
[1:11:26]
additions to 34 Eucalyptus Road.
[1:11:38]
Can we have a presentation from staff,
please?
[1:12:12]
Yeah, we're ready.
>> Thank you, Chair Cidle, and members of
[1:12:15]
the planning commission. Again, uh for
your consideration, this evening is an
[1:12:19]
application for design review to
construct two additions in a canopy at
[1:12:24]
34 Eucalyptus Road.
[1:12:29]
The subject property is 22,000 square
feet and on a steeply slope lot on the
[1:12:34]
southwest side of Belvadier Island. The
parcel is located near the end of a
[1:12:37]
culde-sac on the private Eucalyptus Road
and is surrounded by single family homes
[1:12:42]
in all directions. The site includes an
existing 3,697
[1:12:47]
foot residence and 600 ft detached
garage which is screened by dense
[1:12:52]
vegetation and mature trees along the
property's western, southern, and
[1:12:56]
northern sides.
[1:13:01]
The applicant proposes two additions
resulting in 289 square feet of new
[1:13:05]
floor area to be located on the lower
level of the existing residence. One
[1:13:09]
addition uh would total 55 square feet
at the northern side of the property, 23
[1:13:15]
feet from the right side property line.
The second addition consists of a 234
[1:13:20]
square ft addition beneath the footprint
of the upper level deck on the at the
[1:13:25]
rear of the residence. The 237 234t
addition will be 17 ft from the rear
[1:13:31]
property line and 45 ft from the left
side property line.
[1:13:36]
» [snorts]
>> The 55 foot edition would include one
[1:13:41]
sliding door and one fixed window. The
234t edition would include one sliding
[1:13:47]
glass door and two fixed windows. The
additions would not increase the height
[1:13:50]
of the home. The 55 ft addition would be
9 ft 6 in in height from existing grade
[1:13:57]
[clears throat] and the 234t edition
would be set into the sloping hillside
[1:14:01]
15 ft above existing grade. The proposed
exterior materials would match the
[1:14:06]
existing residence, including dark flint
flint rock colored wood siding and steel
[1:14:11]
windows and doors in a matte dark bronze
finish. [snorts]
[1:14:16]
The project proposes a constructing a
new 532 ft steel canopy on the existing
[1:14:23]
upper level deck.
[1:14:28]
The canopy structure would be 11 ft tall
and supported by four steel columns with
[1:14:33]
a matte dark bronze finish. The existing
deck would be renovated as well with the
[1:14:38]
existing seating area to be removed and
installation of new stone pavers and
[1:14:43]
glass guardrails.
[1:14:47]
Here are the rendering details. The look
of the stone deck and canopy. The canopy
[1:14:52]
would include motorized shades as well.
[1:14:57]
Exterior lighting is proposed on the new
canopy and they would include six flush
[1:15:01]
mounted exterior lights between the
canopy steel slats.
[1:15:08]
Uh the project does propose landscaping
uh that would include prairie drop seed
[1:15:12]
grass within a 27 square foot planter uh
on the entry level deck. the grass would
[1:15:18]
grow to a maximum height of 4 feet.
[1:15:23]
Uh for the commission's consideration,
we did re receive one letter uh about
[1:15:29]
the project uh related to a previous
approval in 2022 and that information
[1:15:34]
was sent to you and on the uh DIS for
you as well.
[1:15:40]
The project is categorically exempt from
SQA.
[1:15:44]
Uh staff recommends that the design
review uh uh be granted and the planning
[1:15:51]
commission adopt the resolutions for
totaling 289 square feet and 532 foot
[1:15:58]
canopy on the existing upper level deck.
Thank you. And we're happy to answer any
[1:16:02]
questions.
>> Yeah. Commissioners, uh questions for
[1:16:06]
staff.
[1:16:10]
» You [clears throat] for staff? you you
were not really counting the um canopy
[1:16:17]
as one of the additions, correct?
Because it's open to the sky. Correct.
[1:16:22]
» Exactly.
>> Okay.
[1:16:27]
[clears throat]
[1:16:30]
If the um canopy were ever to be more
completely covered like more than 50%
[1:16:37]
then it would it would count as square
footage and it would be non-compliant I
[1:16:42]
presume.
>> We would then count it as square
[1:16:44]
footage. Yes.
>> Okay. Thank you.
[1:16:52]
um regarding the um letter that we have
about the lighting that um I didn't look
[1:17:00]
at the lighting when I was there. It
seems like it may not be compliant with
[1:17:05]
our the existing lighting may not be
compliant with our guidelines. Is that
[1:17:09]
something that
we can think about here or is that
[1:17:14]
something that should be handled through
another uh process?
[1:17:20]
The design review findings do take into
consideration all existing
[1:17:24]
nonconformities.
Uh I remember that that lighting that
[1:17:28]
was uh approved in 2022, it was
incorrectly approved.
[1:17:33]
So
yeah, it was it was subject to a final
[1:17:37]
lighting and landscape plan by the chair
at the time. The chair did not get a
[1:17:41]
opportunity to review those those
lights. So,
[1:17:45]
uh, there it was approved and the
building permit was issued, but there
[1:17:49]
was no final lighting and landscaping
plan that was approved by the chair in
[1:17:54]
2022.
Okay. Um, so that's good history. Is it
[1:18:01]
is it something that we could act on in
in this approval and ask for it to be
[1:18:07]
rectified or do we need to separate
them? And
[1:18:11]
» we have the points.
[1:18:17]
I think typically it would be handled
through a code enforcement action. I was
[1:18:21]
involved with some of the complaints
about the lights and I pulled up the
[1:18:26]
plans and the lights that are my
understanding in 2023 that the lights
[1:18:33]
that are on there are the are the lights
that were approved. So it sounds like
[1:18:37]
amongst staff we need to do a little
more historical research into this.
[1:18:42]
» Yeah. Um, I mean, I'm I'm sympathetic to
what the letter is expressing. However,
[1:18:49]
um, I don't have
information regarding the details of it.
[1:18:54]
So, like for me, it would be kind of
hard to to say anything at this point.
[1:18:59]
So, um, I just, um, but I think maybe
there's something that internally you
[1:19:04]
could do in terms of rectifying this the
situation if it's non-compliant.
[1:19:11]
Okay.
>> Yeah. Can we
[1:19:15]
even though this was formally approved,
can we
[1:19:20]
um encourage the applicant to change
those lights?
[1:19:28]
» Yeah, I think sorry. Go ahead.
>> Yeah, c commissioner. Yeah, certainly
[1:19:32]
one of the options is to discuss the
issue with the property owner, but it
[1:19:35]
sounds like again that we also need to
make sure that we understand the history
[1:19:38]
as well.
>> All right. Because I what I also noted
[1:19:42]
there are six more lights under the
canopy which we can discuss with the
[1:19:47]
applicant that um I asked him to
decrease. Okay.
[1:19:50]
» Okay. Thank you.
[1:20:00]
» Um
um if we have no further questions, is
[1:20:04]
the applicant here? Would they like to
speak? Yeah. Thank you.
[1:20:12]
Yeah, thank you for your time this
evening. Um,
[1:20:16]
I met with uh Marsha on Sunday and um
she had some very good ideas. We will
[1:20:22]
reduce the number of lights in the
canopy from 6 to three. And if if the
[1:20:27]
council would like us like me to replace
the lights on the on the uh deck, I
[1:20:31]
don't want it to be an issue with with
my neighbors and I'd be happy to do that
[1:20:35]
and make it conform.
want to be a good neighbor. And also,
[1:20:40]
Marcia had a very good idea about
landscaping below the add proposed
[1:20:45]
addition. And we have we the architects
uh and landscape companies sent a plan
[1:20:51]
in this evening. I don't think it made
it in time for the meeting. Uh that
[1:20:55]
includes landscaping all under all on
the hillside and uh four oak trees, two
[1:21:02]
30-inch box oaks, and two 24inch box oak
trees.
[1:21:09]
Thank you.
>> Thank you.
[1:21:15]
» Um, any questions from the planning
commission to the applicant?
[1:21:24]
[laughter]
[1:21:28]
» She's got a lot of experience, right?
[1:21:32]
Are there any comments um from members
of the audience regarding this item?
[1:21:39]
» I I have one comment. Um
if you if it's in the planning
[1:21:45]
commission's interest, we will pull up
this landscape sheet because the
[1:21:51]
additional landscaping would require
design review. So if you can review it
[1:21:59]
on the dis I think that would help the
applicant out to not have to go through
[1:22:03]
design review again.
>> Okay.
[1:22:05]
» That sounds
>> I know that's putting a lot of pressure
[1:22:06]
on you.
>> Yeah. Well, I was going to make it a
[1:22:09]
condition.
>> Yeah.
[1:22:10]
» I was going to make the landscaping as a
condition of approval.
[1:22:15]
» Okay.
>> That size
[1:22:18]
have to be reviewed at a design review
level.
[1:22:22]
» Okay. So, is this a revised plan that
we're looking at?
[1:22:28]
» Yeah,
>> I don't think so. I think it's new.
[1:22:32]
» It was an addition.
>> Oh, okay. But this represents the
[1:22:36]
landscaping that you just discussed that
you so maybe you could just spend a
[1:22:43]
minute describing what this exhibit.
>> We just got it today. [laughter] So, we
[1:22:48]
can
>> it it's it's uh basically a variety of
[1:22:53]
different shrubberries and then the four
oak trees that you see there um closer
[1:22:58]
to the uh Belvadier Avenue. Um, and we
we did that on Marsh's direction. And I
[1:23:07]
I did plan on on doing some enhancement
of landscape because there's been a lot
[1:23:12]
of work done um under the house uh air
conditioning and and some shoring up of
[1:23:17]
the
of the uh foundation. And it's pretty
[1:23:22]
much just bare land. And I wanted to
bring it up to uh
[1:23:31]
bring it up to a higher quality look.
[1:23:36]
» I think the the I think the biggest sort
of impact here are these four C oak
[1:23:41]
trees.
>> Um we don't have a size on it. I think
[1:23:44]
that can be determined um with the
planning commission chair afterwards if
[1:23:49]
you're inclined to review this tonight.
Um the other landscaping the maximum
[1:23:54]
height ranges from 1 foot to six feet. I
think that's sort of you know what the
[1:24:00]
planning commission tends to look at in
terms of height and potential view
[1:24:04]
impact and things like that. I think the
the biggest impact again are these trees
[1:24:09]
here um which look like they're going on
the lower side of the house.
[1:24:13]
» So I would assume it would be a while
before
[1:24:18]
No, they're going here on the side. So I
think that's a detail that can be
[1:24:22]
determined with the planning commission
chair.
[1:24:25]
» I was thinking that perhaps the
landscape plan could be it could be
[1:24:29]
conditioned but then it could be
approved by the chairman and planning
[1:24:33]
staff.
>> Yes. Okay.
[1:24:35]
» And um Rebecca, if you just scroll this
up a little bit. The area on the right.
[1:24:40]
Uh no,
move the image up. It the the deck with
[1:24:45]
the canopy is above that rectangle.
um there.
[1:24:50]
» Yeah.
>> And there's planting that's going under
[1:24:53]
the deck, I guess, if I understand that
correctly.
[1:24:57]
» Yes.
>> So that way when people are looking up
[1:25:01]
from the street, they'll see the
planting.
[1:25:03]
» Yes.
>> Good.
[1:25:07]
» Yeah. Here's the deck area. And here
these plantings are some type of
[1:25:12]
rosemary,
[1:25:15]
» but they're they're at ground level.
They're ground. They're two feet.
[1:25:19]
» Yeah. Okay.
[1:25:22]
» Okay.
>> Yeah. You can't I don't think we they're
[1:25:25]
allowed to plant rosemary. They're
stringing, which is a different Yeah,
[1:25:28]
that's fine.
>> Okay.
[1:25:30]
» Yeah. Catch on fire. [laughter]
[1:25:40]
» And are are these the kind of oak that
grow to be 30 to 50 feet high?
[1:25:46]
I'm sorry. Are the Are these the kind of
oak tree that grow to be 30 to 50 feet
[1:25:51]
high?
>> No, that's not the plan. No, just I I
[1:25:54]
think they're slow growing. I I I talked
to uh talked to landscape uh uh owner
[1:26:02]
landscape company. I think the 30-inch
box trees are maybe 12 feet high when
[1:26:07]
you plant them, and they're pretty slow
growing. They are co-live oak so I think
[1:26:10]
they have the potential but
>> right but it'll it would take longer
[1:26:14]
than for me to be here on
>> dead.
[1:26:17]
[laughter]
[1:26:23]
» Okay. Does everyone feel like they got a
good look at that?
[1:26:26]
» Just in all seriousness, we would once
we get that final landscape plan, we
[1:26:30]
would put a max height on them. Yep.
>> Okay. Okay.
[1:26:39]
Thank you.
>> Thank you for that. Um I don't think I
[1:26:41]
asked were there anybody was there
anybody on Zoom that wanted to hands
[1:26:45]
raised say anything here?
>> No hands raised.
[1:26:49]
» Okay.
Um any do you have anything further to
[1:26:53]
add to your presentation?
>> No sir. Thank you so much for your time.
[1:26:56]
» Thank you.
>> I'll now close the public hearing and
[1:27:00]
bring this
>> people in the audience.
[1:27:04]
» Oh. Oh, I didn't
>> come on up.
[1:27:11]
» You brushed so quickly past in anybody
in the audience, so I didn't have time
[1:27:15]
to state that.
>> I I apologize. I want to put a face to
[1:27:19]
the letter [clears throat] A heart and I
wrote it be
[1:27:23]
» because I was really involved in the
first um
[1:27:28]
» permit and all that with with this
wonderful house and I want to say I
[1:27:32]
really think you're doing something
smart. It looks like really thoughtful
[1:27:36]
stuff. But your comment that you would
uh definitely think about taking away
[1:27:42]
these lightsabers
warms my heart and I'm really grateful
[1:27:48]
and I just want that to go on the record
that I just don't want to complain but I
[1:27:53]
also want to congratulate and thank you.
>> Thank you.
[1:27:58]
» Thank you. Nana Hart 206 Eucalyptus
Road.
[1:28:07]
» Okay, I'm going to bring this um back to
the commission for discussion. Um
[1:28:11]
Missola, could you start us off, please?
>> Sure. Um I want to thank the applicant
[1:28:16]
for uh um for the changes in the
landscaping. I think it'll be a nice
[1:28:21]
addition. Um, yeah, I would like the
staff and the commission chair to review
[1:28:25]
the plans finally, but I I think it
it'll be a nice addition. I also
[1:28:30]
appreciate the reduction in the lights.
That was sort of my main concern about
[1:28:33]
the project was whether or not uh there
was too much lighting. Um, otherwise, I
[1:28:38]
do think the uh the the small additions
are compatible with the existing
[1:28:42]
structure and don't impact the
neighborhood and the um the obviously
[1:28:46]
the canopy is quite attractive and a
nice addition as well. Thank you.
[1:28:54]
Uh Jenna,
[1:29:00]
» um I al I also I also appreciate the
project and also your willingness to uh
[1:29:05]
to add some softening with with
landscaping and reduction of lighting,
[1:29:09]
both existing lighting and uh and and
the and the proposed lighting. Um, and I
[1:29:15]
think that with
um with having chair Sidell be able to
[1:29:21]
approve um the new lighting to replace
the existing lighting and also the final
[1:29:28]
landscaping plan. I think this I think I
can I can support this project. Thank
[1:29:33]
you.
>> Thank you, Marca.
[1:29:38]
Um I I really can understand why um the
applicant would like this um awning
[1:29:45]
because they face um southwest and they
get which I also do which I like but you
[1:29:51]
get a lot of sun and there are no um
overhangs on this house. So I think that
[1:29:55]
will really help him um especially today
I'm sure you you felt it. Um, so I can
[1:30:02]
make the findings for design review uh
for this uh project. But with the um
[1:30:10]
condition of the additional landscape
below the house, um when when I walk by
[1:30:16]
Belvadier Avenue and look up, even now
the deck seems to me very close even
[1:30:21]
though it it's I guess 17 ft. And so I
think having additional trees and
[1:30:26]
landscape there will screen the street
and also screen the house, give some
[1:30:32]
screening to the new addition which is
on the lower level which I think will
[1:30:36]
really help. Um and also I think we need
to have a condition of reducing the um
[1:30:45]
lights from six to three. And if you are
willing, it would be great to take out
[1:30:51]
the the tall the linear lights that are
on the deck and replace those if that
[1:30:56]
can be part of the condition. That would
be great. Thank you. Um so I can make um
[1:31:01]
the design review findings and I think
it's a great um project and um hopefully
[1:31:07]
it'll keep you a little cooler.
[clears throat]
[1:31:11]
» Thank you. If I may just chair for the
record, I do want to I just do want to
[1:31:17]
document for the record that the
applicant did say yes in the audience
[1:31:20]
and when Commissioner Laskkey read out
the condition regarding the linear
[1:31:24]
lighting. Thank you.
So, um, I just want to start by saying,
[1:31:31]
you know, kind of one of the interesting
things about being in this position on
[1:31:35]
the planning commission is getting
around and seeing all these interesting
[1:31:39]
homes and properties in in Belvadier.
And, um, I actually think you have a
[1:31:44]
really attractive home. Um, I think that
the additions you're planning on making
[1:31:49]
are very consistent um, with the
character of the home. I think it'll be
[1:31:54]
attractive. um like my fellow
commissioners, I'll be able to make the
[1:31:58]
design findings and um I appreciate the
additional landscape and lighting
[1:32:04]
changes that you're offering. Um
so um any further discussion with within
[1:32:13]
the commission or I was wondering if
Commissioner Laskkey would like to make
[1:32:18]
the motion given that um you have some
additions and you've been involved in
[1:32:24]
the evolution of the design.
[1:32:29]
I move to adopt the resolution granting
design review for two additions totaling
[1:32:34]
289 square ft and a 532 square ft canopy
on the existing upper deck at 34
[1:32:42]
eucalyptus with the two conditions of
reducing the lighting from 6 to three um
[1:32:50]
to replace the existing lights on the
deck um and also to add the there are
[1:32:56]
three conditions, sorry, to add the
landscaping below the um deck under the
[1:33:02]
new addition with um oak trees.
[1:33:11]
» Can I make a comment? um just that um
uh I don't know um I wonder if it's
[1:33:20]
better to not be too prescriptive about
the landscape um proposal uh because it
[1:33:26]
still needs to be reviewed by staff and
um
[1:33:29]
» right so we could say that the that the
replacement lighting um and the final
[1:33:35]
landscape plan
is it best to have it to have it
[1:33:39]
approved by by Chair Sidell or by staff
[1:33:45]
both.
>> All right. Yeah, both.
[1:33:51]
So, I guess that would be conditions two
and three, both the replacement lights
[1:33:55]
and the final landscaping plan to be
reviewed by staff and approved by both
[1:34:01]
staff and chair Sidel.
[1:34:07]
» Prior to issuance of building permit.
prior to issuing building permit.
[1:34:13]
» Thank you, Rebecca.
And I'll second that motion.
[1:34:18]
» Okay.
Then please vote. I
[1:34:22]
» I
[1:34:28]
» Yeah.
>> Take care.
[1:34:41]
We will now move on to review item
number four which is design review
[1:34:45]
demolition and floor area exception at
135 Belvadier Avenue.
[1:34:53]
Staff report please.
>> Thank you again chairle and members of
[1:34:58]
the planning commission for your
consideration. Here is an application
[1:35:02]
for design review, demolition, exception
of total floor area, and revocable
[1:35:07]
license to construct a new single family
home at 135 Belvadier Avenue.
[1:35:14]
The project site is on a steeply sloped
52,000t lot. The site received a lot
[1:35:19]
merger lot merger approval in 2019,
which previously consisted of three
[1:35:25]
parcels. The site is developed with an
existing dilapidated residence and
[1:35:29]
wooden staircase. The existing structure
is centrally located on the lot and
[1:35:34]
surrounded by mature unmaintained
vegetation.
[1:35:39]
The applicant proposes to demolish the
existing 3,764
[1:35:44]
ft residence and construct a new 11,223
ft residence and 495 ft junior accessory
[1:35:53]
dwelling unit.
The residence will be located on the
[1:35:58]
upper third of the site where the
existing home currently sits. The home
[1:36:01]
would be developed in two floors
including a 4,761
[1:36:06]
ft f first story, 4,912
ft second story and 1,250
[1:36:13]
ft attached garage
[1:36:17]
16t and 5 in from the rear property
line. The project proposes a 300 foot
[1:36:23]
boat house.
[1:36:27]
The proposed residence will be set back
14 ft from the right sideyard, 32 feet
[1:36:32]
from the left sideyard, and have a zero
front yard setback [clears throat] for
[1:36:35]
the garage.
For transparency, the applicant in is
[1:36:40]
including plans to construct a detached
ADU on site. The ADU would be reviewed
[1:36:45]
under a separate permit and would not be
subject to design review.
[1:36:51]
The front of the home would include a 7
foot 10-in wide by 11t 8 inch tall glass
[1:36:57]
entry door between two fixed windows.
Because Belvier Avenue would be 20 ft
[1:37:03]
below above the second story's finished
floor, the 17t 8 inch tall roof and 12t
[1:37:10]
8 inch tall garage would be below street
level.
[1:37:14]
Floor
to ceiling, exterior windows and doors
[1:37:18]
are proposed on the right and left side
of the house.
[1:37:22]
Measured from existing grade, the
residence is proposed to be 32 ft tall
[1:37:30]
and viewed from the rear. The project
proposes a series of Florida glass floor
[1:37:34]
to ceiling glass windows and glass
guardrails.
[1:37:40]
The project proposes a contemporary
design with sharp vertical and
[1:37:43]
horizontal elements, glass guard rails
and windows and canolver roofs. The
[1:37:47]
color palette consists of soft and muted
wooden earth tones including board form
[1:37:52]
concrete siding in a warm white color, a
tar and multicolored gravel flat roof,
[1:37:57]
western red cedar wood siding, and
aluminum um aluminum windows and doors
[1:38:03]
trims in a dark bronze or black finish.
The proposed materials add architectural
[1:38:08]
variety and help to break up the
building's massing.
[1:38:14]
Access to the residence will be via a
new 16t 8 inch wide paved driveway and
[1:38:19]
15t wide 6ft tall steel automo
automobile gate on the left side of the
[1:38:24]
property which would lead to a new autoc
court and garage.
[1:38:29]
The entry gate would be made of dark
metal horizontal rails and bordered by a
[1:38:34]
6-ft tall concrete freestanding wall on
both ends.
[1:38:40]
New fencing is proposed, including a 6ft
tall vertical bar metal fence along the
[1:38:45]
front property line, a 6ft tall wood
fence along both side property lines,
[1:38:50]
and a galvanized steel fence that would
be painted black along the rear yard.
[1:38:56]
Additional improvements would include a
new 16 ftx 48 foot inground swimming
[1:39:01]
pool and spa on the rear patio
left of the pool. The project would
[1:39:06]
include a 12tx 24 ft trellis structure
standing 10' 4 in tall that would
[1:39:13]
accommodate outdoor seating, a stone
countertop, and a barbecue.
[1:39:20]
Because the home is proposed to be
stepped back and into the hillside, it
[1:39:24]
would reduce the structures perceived
mass and bulk. Doing so, however, would
[1:39:28]
result in extensive grading concentrated
extensive concentrated grading at the
[1:39:34]
upper portions of the property. Up to 20
vertical feet of soil will be excavated
[1:39:39]
below Belvier Avenue to construct the
proposed autocore and up to 13 vertical
[1:39:44]
feet of soil excavated to construct the
residenc's first story. The project
[1:39:49]
estimates 2500 cubic yards of excavation
and 1,700 cubic yards of fill. While the
[1:39:55]
proposed grade changes are significant,
constructing the home at the upper
[1:39:59]
portion of the lot will preserve much of
the site's natural grade and vegetation
[1:40:03]
below.
[clears throat]
[1:40:07]
The project proposes a series of path
lights, wall lights, ingground lights,
[1:40:11]
handrail lights, and wall sconces. 62
wall lights are proposed around the
[1:40:16]
driveway and stairs and 36 recess down
lights and wall sconces are proposed
[1:40:20]
throughout the residence. Staff suggests
the fixture quantities are modest given
[1:40:25]
the size of the home, but recommends the
micronite star down light by BK Lighting
[1:40:30]
be replaced with a fixed downward-f
facing option.
[1:40:38]
The project proposes removing 54 trees
including multiple 30 to 60 foot tall
[1:40:42]
Monterey pines, 50 15 to 30 foot tall
coastal live oaks and one 67 foot tall
[1:40:48]
cyprress as well as one 70 foot tall
eucalyptus. The trees are generally
[1:40:53]
within the footprint of the proposed
home and heartscape.
[1:40:59]
New landscaping would include a variety
of shrubs and perennials within the
[1:41:03]
front, side, and rear yards of the home
uh to screen the proposed front yard
[1:41:07]
fencing, retaining walls and stairs. The
project would include planting eight
[1:41:13]
southern live oaks in 36-in boxes, which
are listed to grow to 20 ft tall.
[1:41:19]
Eight Chinese elm are also proposed in
36-in boxes along the southern end of
[1:41:24]
the right side property line.
[1:41:30]
The applicant requests an exception of
total floor area uh approval for the
[1:41:34]
11,223
square ft where 4850 ft are permitted.
[1:41:41]
In order to grant the exception, the
planning commission must be able to make
[1:41:44]
each of the following findings. These
include that primary views will not be
[1:41:48]
significantly impaired, that there are
unusual characteristics applicable to
[1:41:52]
the parcel which minimize the impact of
the greater floor area, that the
[1:41:56]
structure is appropriate in mass bulk
and character of the neighborhood, and
[1:41:59]
that the additional square footage will
not substantially reduce privacy on
[1:42:03]
adjoining properties.
Here staff recommends the findings can
[1:42:08]
be made.
Primary views from adjacent properties
[1:42:13]
will not be significantly impaired as
the subject property is above the
[1:42:16]
adjacent 125 Belvadier and two Cliff
Road.
[1:42:21]
Views from Belvadier Avenue and uphill
neighbors will not be impaired as a
[1:42:25]
residence is set below the street line
and tucked into the hillside.
[1:42:30]
[snorts] The site is unusual in that it
was historically three separate parcels
[1:42:34]
until 2019.
The larger lot size and steep steeply
[1:42:38]
sloped nature of the site minimize the
buildable area and impact to the
[1:42:42]
additional floor area.
[1:42:47]
The project is appropriate in mass bulk
and character for the parcel and in the
[1:42:51]
neighborhood and meets all design review
criteria. The 23 foot 6 inch average
[1:42:57]
building height helps decrease the the
appearance of mass and bulk on the site
[1:43:02]
and the 32- foot tall max height is
consistent with adjacent properties.
[1:43:06]
With respect to size, the proposal is
not unusual in the neighborhood. In
[1:43:12]
2016, Cliff Road was approved for a
12,000 foot residence. In 2009, 425
[1:43:18]
Belvadier received the approval to
construct a 15,555T
[1:43:23]
residence and 337 Belvadier, 255 Golden
Gate Avenue, and 345 Golden Gate Avenue
[1:43:29]
are examples on the western side of
Belvadier Island, uh, where the floor
[1:43:34]
area permitted is exceeded.
[1:43:41]
Finally, the project does not
substantially reduce privacy of
[1:43:44]
adjoining properties as the proposed
windows are not within neighboring sight
[1:43:48]
lines and landscaping will screen uh
screening will provide an additional
[1:43:53]
buffer.
[1:43:59]
The applicant requests a revocable
license for a wood fence, gates,
[1:44:02]
driveway, parking, and landscaping all
within the Belvier Avenue rightway.
[1:44:09]
On the right side of Belvadier Avenue,
uh, a 6- foot tall wood fence and access
[1:44:14]
gate are proposed. The fence would
encroach 7 feet 9 in onto city property
[1:44:19]
and would be set 1 ft below the edge of
pavement and would appear 5t tall at
[1:44:23]
street level.
[1:44:27]
Also within the right ofway, the
applicant proposes to plant coffee berry
[1:44:31]
dwarf mat rush, Fortnite lily, and
rasleberry French flour.
[1:44:37]
Uh these shrubs and perennials are
listed to grow no taller than 4 feet in
[1:44:41]
height.
[1:44:44]
Additionally, the applicant would widen
Belvier Avenue from 17 ft to 24 ft 9 in
[1:44:49]
by relocating the existing street
parking 7 ft closer to the front
[1:44:54]
property line. Staff recommends that
these rightway improvements provide a
[1:44:58]
public benefit. Widening the roadway
serves pedestrians and vehicles on a
[1:45:02]
currently narrow road. The parking
spaces are entirely public and serve as
[1:45:07]
a public benefit. Landscaping will
enhance the aesthetic quality of the
[1:45:10]
streetscape and the fence will serve as
a safety barrier and delineate the
[1:45:15]
roadway from the hillside for oncoming
vehicles.
[1:45:20]
The project is exempt from SQA
[1:45:25]
and staff recommends the findings for
design review, demolition, exceptional
[1:45:28]
floor area and revoke license can be
made. recommend adopting the resolutions
[1:45:32]
before you tonight. Thank you. And we
are happy to answer any questions.
[1:45:37]
» Thank you, Sammy.
[1:45:42]
» I had a couple questions. Um, does this
property have an existing revocable
[1:45:48]
license now? And what is that for?
>> It it does I could look in the records
[1:45:55]
um to the year, but it is for the
frontage improvements and that was
[1:45:59]
recorded. It includes
I should I don't want to speak out of
[1:46:04]
turn. I believe it includes a trash
enclosure, but I'll double check.
[1:46:08]
» It includes the trash enclosure. So,
they don't need another revocable
[1:46:13]
license for the trash enclosure that it
already has one.
[1:46:16]
» It It has one. This one would be a a new
revoke license that includes
[1:46:21]
landscaping. So, this would be a brand
new revoke license taken to to uh the
[1:46:26]
council. Is it replacing the old one or
it's an additional one?
[1:46:30]
» It would replace the current.
>> Oh, so it's replacing Okay.
[1:46:35]
» Yeah, because we because we reviewed the
fence here
[1:46:39]
not terribly long ago.
>> That's right.
[1:46:41]
» Right.
>> Um, one other question. Um, there is an
[1:46:46]
additional five parking places near the
property. Um, but is the parking there's
[1:46:51]
a parking place across the street. Is
that coming out?
[1:46:56]
That's against the hillside.
>> I don't believe it's coming out, but
[1:47:01]
» So, it's staying.
>> Yes.
[1:47:02]
» Okay. So, then and there two places near
the property. So, that means
[1:47:08]
um
five, six. Okay. I was trying to see how
[1:47:12]
many new new parking places they would
be. Um
[1:47:18]
[clears throat] Okay, those are my
questions.
[1:47:27]
Okay, thank you.
>> Do any other commissioners have any
[1:47:30]
questions?
[1:47:34]
» Um, well, I well, I recognize that this
is this is a piece of property that
[1:47:38]
hasn't been touched other than by
coyotes in in decades. Um, I do
[1:47:44]
appreciate that there's a lot of big old
trees that are come that are coming out
[1:47:49]
um especially cypress trees uh which are
which are native. Um, are there any of
[1:47:55]
the the big trees that are able to be to
be saved? I mean, that are not under
[1:48:01]
where the the building is currently
going to be.
[1:48:06]
» I think that's a better question suited
for the landscape. Okay.
[1:48:10]
» Yeah. Thank you.
>> Yeah. Okay. Yep. Thank you.
[1:48:20]
» Sold. Did you have any questions? Okay.
Would
[1:48:34]
the applicant like to make a
presentation
[1:48:37]
» any with your permission? I'm going to
stand up as well, but it's just for my
[1:48:40]
back. Thank you.
[1:49:11]
» [clears throat]
[1:49:17]
» Yeah, my name's uh David Katsub and I'm
the architect for the project. We also
[1:49:21]
have John Merton here at Studio Green
and he can, you know, get into the
[1:49:24]
landscaping and all those tree
questions. So, I just wanted to point
[1:49:28]
out, you probably already know, but I
just wanted to record to show that this
[1:49:30]
is the exact design that was approved in
June of 2017.
[1:49:36]
So, we have not made other than the
elevator, the hillside lift, we have not
[1:49:40]
made any changes um to that approval.
So, Sammy made a great presentation. and
[1:49:47]
he stole all of my thunder. But this is
the drone shot we took back then. And
[1:49:53]
the idea was is so we're going to
position the house at, you know, where
[1:49:56]
the existing one is. And it is sort of
upper mid from the midpoint of the lot
[1:50:01]
just above the midpoint. And what it
does is it orients the house in the
[1:50:05]
negative space of 125 Belvadier and a
little bit of two cliff road.
[1:50:12]
And so in elevation, what's important to
this design is the fact that we keep it
[1:50:17]
as a twostory residence versus maybe a
three or even a fourstory. Um, and so
[1:50:23]
the the aspect ratio will be horizontal,
which I think is consistent um with the
[1:50:29]
neighborhood and also appropriate for
this hillside. Next, so here's the site
[1:50:34]
plan. Um, we picked the access point and
I think others that have worked on this
[1:50:40]
property have where Belvadier Avenue is
the lowest. And what we're trying to do
[1:50:44]
is we're trying to get down um as soon
as we possibly can to get on grade with
[1:50:49]
the main level for this two-story
design. And so once we arrive at the
[1:50:54]
motor court, we basically establish um
the second floor, which is the main
[1:50:58]
floor. And there aren't any level
changes um in that within that floor.
[1:51:05]
So this is a graphic I did to try to
explain
[1:51:09]
um in my mind it's it's nothing in the
ordinance or code but what I did is I
[1:51:14]
took a contour that was 7 feet above the
lowest floor. So, I took contour 104,
[1:51:21]
which is the lowest floor is 97. And
that yellow area is the amount of floor
[1:51:27]
area that's cut into the hillside, which
reduces greatly, I think, the um effect
[1:51:34]
of the the 11,000 foot house. And that
yellow area totals out to be about 3,100
[1:51:40]
square feet.
The other thing that we're doing because
[1:51:46]
you know the roof is below Belvadier
Avenue and they are flat, we are
[1:51:50]
incorporating um quite an extensive
green roof system. So those green
[1:51:54]
pocheted areas indicate that.
[1:51:58]
And then this is the upper level, the
main level. So just you know showing the
[1:52:02]
organization of the house down the
center spine you peel off to the west or
[1:52:07]
you peel off to the east to the private
bedroom or go downstairs which is the
[1:52:11]
next slide.
And in the downstairs we you can see
[1:52:16]
where the the part that's really up into
the hill towards Belvar Avenue is it's
[1:52:20]
rendered out as a home theaters, a gym
and some utility. And then on the west
[1:52:26]
side it's um utility, laundry room and
mechanical. And the orange is shaded
[1:52:33]
area is the junior ADU and the purple is
the detached ADU.
[1:52:39]
And this is the section that Sammy
showed which um indicates how it is cut
[1:52:44]
into the hill to create this two-story
design. I threw in a couple of oak trees
[1:52:48]
after I talked to Marsha on the bank.
I'll have John talk about that.
[1:52:53]
» [laughter]
>> and and this and so what we think we're
[1:52:56]
doing here is we're opening up Belvadier
Avenue. I mean it's already opened up
[1:53:00]
after we put in that fence which is a
temporary fence but it indicates the
[1:53:03]
height of what our permanent fence will
be and it really opens the view up and
[1:53:07]
removing the existing garage is I think
had a major impact for the better. So,
[1:53:13]
in the u you know, this is the main
motor court. You get down and and we're
[1:53:18]
framing the Golden Gate Bridge, and I
got a little water feature that I'm
[1:53:21]
going to try to match the bay color. And
the great room, if you will, is a bridge
[1:53:26]
between the water feature and and the
bay.
[1:53:30]
And I think this view is a good
indicator of the articulation of the
[1:53:34]
walls both um in horizontal and vertical
planes and also the composition of the
[1:53:40]
materials and the juxosition of the
softer warmer wood against the darker
[1:53:45]
steel and the natural concrete.
[1:53:50]
And this shows the ADU which I guess
isn't under your purview today but I
[1:53:54]
just thought it was a cool rendering.
And this finally at the bottom, we are
[1:53:59]
able to get some uh level outdoor space,
which I think is extremely valuable um
[1:54:05]
on the island, especially on a site that
slopes this steeply.
[1:54:10]
And this is the last view. Um and so the
I hope that this presentation tells the
[1:54:16]
story of how we started and how we ended
up here. And if we have some more time,
[1:54:21]
I think John's ready to talk about the
landscape.
[1:54:25]
just
[1:54:29]
» um David, the drive where the driveway
is, um when you're coming from the south
[1:54:36]
on Belvadier Avenue, you are able to
turn right and go in without coming from
[1:54:40]
the other direction.
>> Correct.
[1:54:42]
» Okay. And one more question. Um on the
um cubic yards, it's about Well, the
[1:54:50]
demolition is about 50 cubic yards. And
does that mean when you say you have the
[1:54:56]
truck is 10 cubic yards per truck?
>> Yeah, those small trucks. So
[1:55:01]
» that's a small truck.
>> Yeah, I think that's the maximum allowed
[1:55:04]
by the ordinance. I'm not sure.
>> So that would be um five trips for that.
[1:55:09]
But then on the other cubic yards, it's
about 775
[1:55:14]
is the difference. Are you able to use
any of that more? Um
[1:55:20]
that's a lot of truck. Yeah, I mean
obviously we can look into it further
[1:55:24]
and detail it. Those figures came from
the civil engineering that was done nine
[1:55:28]
years ago. Um it's something that we we
definitely want to use as much as
[1:55:33]
possible on site
>> because I know you have to you have to
[1:55:37]
fill up the road to make it level two.
Yeah, there may be
[1:55:41]
» um you know we also were trying to
decrease the amount of
[1:55:44]
» truckloads on the roads and traffic etc.
I think one of the this is kind of
[1:55:49]
almost the last lot or at least in my
opinion and you're on Belair Avenue and
[1:55:54]
you know then you start to get into it
gets tighter and you get around the
[1:55:57]
point. This is before that. So that the
one benefit I realize it's a lot of
[1:56:01]
trucks is we're closer to um you know
Britain and way down.
[1:56:05]
» Yes. Five corners. Yes. Um and did you
bring your did you bring color samples
[1:56:12]
of the concrete and the wood? I I don't
have actual physical samples here today.
[1:56:17]
It's more of the photographic.
>> All right. Thank you.
[1:56:25]
» Uh good evening. I'm John Martin with
Studio Green Landscape Architects and
[1:56:29]
excited to really work on this project.
I I never thought it was going to come
[1:56:33]
back and you know other house got
approved and now this one's back and
[1:56:38]
it's fantastic because I really um was
excited about it way back when. Uh we
[1:56:44]
can go to the next slide which is a site
plan.
[1:56:48]
Uh wait I guess that's not how about the
next slide. We can go back to this.
[1:56:56]
Um so this is a plan view site plan. Um
you know we we because the house sits
[1:57:03]
down and um we really can open up the
the front from the street. Um we we feel
[1:57:10]
like there's a huge advantage here and a
great benefit for the community. Uh you
[1:57:14]
know his be previously it was a fence
right along the the whole street and you
[1:57:19]
really didn't have a view and now it
really is opened up. The majority of the
[1:57:23]
trees in the center portion of the
property are Monterey pines. I believe
[1:57:28]
there's one cyprress um which the report
recommended removal because of its
[1:57:36]
condition but also it's a fire hazard.
But in any case uh there and three four
[1:57:42]
of the current large Monterey pines that
were in the center of the property have
[1:57:46]
actually collapsed and fallen down since
we did this project
[1:57:50]
um some years ago. Uh and I think one
even went through the roof of the
[1:57:55]
current house. Um and you can you can
see them. and they're sitting on the
[1:57:58]
ground. Uh the uh as David was saying,
how the house is developed in this uh
[1:58:05]
layering down into the there is sort of
a flatter area um 23 feet below the
[1:58:12]
street and that's the opportunity spot
to capture some flat space and and also
[1:58:20]
for the landscape exterior uses to be
associated with the house in a really
[1:58:24]
tight and compressed way. So, we really
when we do utilize some open space,
[1:58:30]
we're we're maximizing the benefit of
that um and not stretching out further
[1:58:36]
than we have to. So, but we really are
trying to also provide for some exterior
[1:58:40]
uses.
[1:58:43]
As you can see in the slides, I think
the the renderings represent the color
[1:58:47]
and the feel very well being that it's a
warm tones. Um, you know, we're thinking
[1:58:53]
of a warm concrete like the buff tones
and and and the stone being in in a warm
[1:58:59]
gray, very neutral, um, contemporary
uh, simple compositions. So, it's not
[1:59:08]
complex patterning, more gridlike, very
restrained, um, almost like museum
[1:59:14]
quality kind of of sense. Also very high
quality materials. So, it's it's not um
[1:59:21]
there's no compromise in finishes and
glass rails and stainless steel and and
[1:59:25]
other other finishes that will hold up
in this setting.
[1:59:31]
the lighting for the exterior
has been commented on. Um, and
[1:59:36]
[clears throat] you know, we were
concerned about I mean, one of the
[1:59:39]
things I hear about on every project we
ever do is like there wasn't enough
[1:59:42]
light, you know, so you know, sometimes
we we go a little heavy and uh there's
[1:59:48]
areas that we can work on and and and
I'll get back to that in a minute, but
[1:59:51]
you know, we're looking primarily
downwardly oriented for safety, for
[1:59:56]
navigation.
um there's no up lights, there's no
[1:59:59]
drama moments, but still even within
that there there's room for maneuvering
[2:00:06]
I think. Um as far as the plant pallet
goes, we were really focusing on
[2:00:13]
evergreen um screening for the
neighbors. Uh so having the landscape
[2:00:20]
that has some presence uh really
mitigating a lot of the any walls or any
[2:00:25]
architectural features that you might
see from offsite which there isn't much
[2:00:29]
because of the way it's positioned. It's
positioned really well. Um concern for
[2:00:34]
fire resistance, drought tolerance, and
also size appropriateness. We we haven't
[2:00:41]
planted say things that are going to get
um you know 75 feet tall next to you
[2:00:46]
know under the eve of the house that
kind of thing. I mean it's it's kind of
[2:00:49]
scale appropriate
and we can jump back to the previous
[2:00:53]
slide. Um I did have a conversation with
chairman uh or the commissioner lassi
[2:01:01]
about the various things. Uh so what
what this slide represents is some of
[2:01:09]
the areas that we've already now given
some thought to in terms of modifying
[2:01:13]
this project.
So for example in the driveway we've
[2:01:18]
taken out every other wall light. Um in
the connection from the main house down
[2:01:24]
to the ADU we've taken out every other
uh in wall light. Uh in the service
[2:01:30]
area, we've taken out the uh five of the
in wall lights on that retaining wall.
[2:01:35]
We did add two pathway lights back
because they're just more general light,
[2:01:39]
less focused on the staircase because
those tend to be have a small pool of
[2:01:44]
light. The other one has a little
broader.
[2:01:47]
We have uh removed the in handrail light
system that was incorporated into the
[2:01:52]
entire staircase going down to the dock
below which obviously from the water
[2:01:57]
looking up you had the chance of seeing
kind of like a you know kind of a
[2:02:03]
disco runway kind of thing going on. So
we agree with that and and uh so that's
[2:02:08]
gone and and we we but we do want to
have enough light that you could at
[2:02:11]
least navigate down without a headlamp
or flashlight necessarily.
[2:02:16]
So, we've we're proposing um this uh the
sea uh it's a brand from Hawaii anyway.
[2:02:24]
It's very rugged coastal uh product that
um it's a 2-in diameter base and and
[2:02:31]
it's a downward oriented light. So, it's
very small that we can be mounted on the
[2:02:35]
post. So, it's very very inconspicuous
and it's set on the C bay side. So, the
[2:02:41]
post itself would mask the light source
from below. So it would be pretty uh uh
[2:02:48]
nearly invisible we think. Um
>> is that what the is that what the blue
[2:02:52]
dots
>> correct are? Okay.
[2:02:54]
» Correct. So we went to the top towards
the top and towards the bottom of each
[2:02:57]
landing so that and not in the midspan
so that you could at least find the
[2:03:02]
first and last step. Then uh then we've
added uh five oak trees on the downhill
[2:03:09]
slope and we have inserted a tree into
the turf area. um next to they're kind
[2:03:15]
of separating where the main public
parts of the house are to a guest bed
[2:03:20]
bedroom courtyard. Um and let's see and
then further uh we did explore moving
[2:03:29]
the trash enclosure which uh uh you know
the the the current house or the the
[2:03:36]
previous house had had it up in the
street but the by moving it onto the
[2:03:40]
property it's quite steep in that
location. Uh it turned out in order for
[2:03:45]
you to take a can and roll it out to the
street, uh that platform would be 10 ft
[2:03:50]
above the ground. And so we it would be
it would force us to build a slight a
[2:03:54]
very elevated structure because then
from the property line to the street,
[2:04:00]
the you're you're you're getting to be
at 8 to 10 feet away from the ground in
[2:04:06]
order for that to be a flat transition.
So, it was a lot of building uh for
[2:04:11]
something that historically has already
had a use.
[2:04:14]
Um I think that's that's all I have to
say for a moment. Thank you. Since we're
[2:04:19]
sort of asking questions during your
presentation, while you're there, um I
[2:04:23]
just wanted to
verify or clarify. I think I recall that
[2:04:28]
there was screen planting sort of
continuous along that wall beneath the
[2:04:35]
pool. Um and that like these trees
aren't substituting for that. They're an
[2:04:40]
in addition. Is that a tree?
>> In addition to that.
[2:04:43]
» Yeah.
>> Uh yeah, this plan
[2:04:46]
we did modify it from the previous
submitt to include uh taller shrubs at
[2:04:52]
the base of that wall and also uh uh
further extending in that in the
[2:04:59]
direction to the east in order to give
more vegetation. And I and I believe we
[2:05:04]
incorporated the loris novelis uh shrub
the in that area which is a really
[2:05:11]
evergreen um takes a lot of sun tough
rugged plant.
[2:05:17]
» Great. Thank you.
[2:05:22]
» I have some questions.
>> Thank you for Thank you for doing that.
[2:05:27]
I think it'll make a big difference in
the property. I don't really want to go
[2:05:31]
over every detail because I know on the
lighting because I know it can be gone
[2:05:36]
over with the chairman and planning, but
um thank you for decreasing those, but
[2:05:41]
there also is um I think an excess
amount of lights on the stairs coming
[2:05:47]
down below the driveway and over the
barbecue. And so there are a lot of
[2:05:52]
different places that the lights I think
can be, but I don't want to go over
[2:05:56]
every one. I think it can be um gone
over um to to decrease that and it's a
[2:06:02]
big help that you put the laurel where
you put the laurel trees that also will
[2:06:06]
give a great screening and thank you for
the trees and the hillside that'll make
[2:06:11]
you know a huge difference too. I did
want to ask you one um the green roofs
[2:06:16]
are going to really make the whole
project fit into the hillside but I
[2:06:21]
didn't know what experience you've had
with them. We've had some in Belvadier
[2:06:25]
actually farther on Belvadier Avenue
where there have been problems where
[2:06:30]
they leaked and they actually ended up
taking them out. I didn't know what your
[2:06:34]
experience with them has been.
>> Well, I've installed a design
[2:06:40]
maybe a dozen or something. Um we did a
project in Ross uh with David and um
[2:06:50]
that had I don't know maybe uh thousand
square feet or maybe 1,200 square feet
[2:06:54]
of of roof and that was primarily uh
succulents. uh what we I have learned
[2:07:02]
from and observed from other projects
that used
[2:07:06]
grasses that they didn't come back and
perform well at all and the ground dries
[2:07:11]
out very very quickly in those
especially here with like you'll have
[2:07:15]
this constant breeze and southern
facing. So uh what we don't want to have
[2:07:20]
is plants that um once they dry out they
turn brown and or go dormant or
[2:07:25]
whatever. So, this would be suitable for
more of a coastal succulent kind of
[2:07:31]
garden. Uh, and in that we've had good
success. In fact, um, Halblivus' house,
[2:07:37]
we did a green roof off his
bathroom terrace and that was very
[2:07:44]
successful.
>> Oh, good. And next to the ADU is a is a
[2:07:50]
Chinese elm. Correct.
>> Correct.
[2:07:53]
» Because there's a tree there. Good. I
wanted to have a tree. Those those are
[2:07:56]
really beautiful. Um
so all the addition of the trees you
[2:08:01]
made which um you had actually added
uh almost 50 30 and so that's that's
[2:08:10]
really um I was upset about seeing 60
trees taken out and 14 going in. So I
[2:08:16]
think you've remedied some of that. Um
>> well I I know because the Monterey pines
[2:08:21]
there there's so many of Monterey pines
and they're so bad. Yes.
[2:08:26]
They're all past their climax.
>> Yes.
[2:08:28]
» Um so they no matter what they should
come out. Yeah. Anyway. Yeah.
[2:08:32]
» Yes. And also the lights. I think you
you did decrease the ones on the boat
[2:08:35]
house. There were quite a few on on that
also. And the strip lights. Thank you
[2:08:40]
for We are always discouraged something
to look like a landing strip.
[2:08:45]
» Yeah.
>> You may get unwanted visitors if um
[2:08:49]
» or disco. And also noted in the staff
report was already a condition to
[2:08:55]
replace the micro uh
night I guess it's called something like
[2:09:00]
that and that's already in the staff
report in order to do that.
[2:09:06]
» Um
and I have to say
[2:09:11]
many people are very excited about
getting that horrible fence out of
[2:09:15]
there. [laughter]
It's nice to have a goodlook fence.
[2:09:20]
We've been looking at that for years and
years. So that it's nice to get rid of
[2:09:23]
that fence. Um,
>> okay. Those are all my questions
[2:09:29]
» for you. And you were going to talk
about the pool lights too. I think
[2:09:32]
» Oh, I'm sorry. Yeah. Uh, on slide if if
we wanted to go to the uh I think it was
[2:09:39]
nine, page nine, slide nine, it it shows
a section cut through the property. Um,
[2:09:46]
the sheet A4.2 two on David's package.
The the the the
[2:09:54]
conversation about the pool uh is that
we placed the lights on the house side
[2:10:00]
such that if you walk to the edge of the
deck and you look down at the pool, you
[2:10:05]
wouldn't see the individual lights in
your eyes. So, you would only see
[2:10:09]
reflection. So, then the concern would
be if that's the case, then what about
[2:10:14]
light pollution going out? Well, in this
instance, from the bay or from uh the
[2:10:20]
adjoining properties, they're slightly
below and there's no possibility to be
[2:10:26]
able to see the pool whatsoever.
And they looking at it from the other
[2:10:30]
direction.
The the street uh is entire the street
[2:10:36]
view is entirely blocked by the whole
house. So there's no possibility that
[2:10:41]
that any part of this swimming pool
could be seen off off the property.
[2:10:47]
So therefore, a glow for the water
um while visible from inside the
[2:10:54]
property is not visible from anywhere
off the property.
[2:11:00]
» Okay. Thank you.
>> Thank you.
[2:11:08]
Thank you for the presentation. I have a
couple questions. I want to focus around
[2:11:11]
the um revocable license area and um for
either of you. Um one is the uh the
[2:11:18]
garbage area. Um
you know, I've read through the policy
[2:11:24]
for revocable license and it it's um
it's discouraging things like the
[2:11:28]
garbage enclosure. I know that uh John
Mertin talked a bit to how difficult it
[2:11:33]
would be to build a structure up there,
but just want to see if if you would
[2:11:37]
consider other locations for
>> Well, we definitely consider it. Well,
[2:11:41]
my question about the revocable license,
though, I mean, I have the copy of the
[2:11:45]
recorded one. Wouldn't it have been um
issued on the on the approval that we
[2:11:52]
got before or did the did the project
after ours into 2023 did it supersede
[2:11:59]
what we
because I think they had a garbage can
[2:12:02]
closure
>> there was a garbage garbage in the
[2:12:06]
previous project and it's been recorded
but if we go in for a new revocable
[2:12:11]
license then previous RLS become null
and void okay
[2:12:14]
» so the garbage
enclosure.
[2:12:19]
» Well, we have a we have we have a little
>> It doesn't sound like there's an
[2:12:22]
enclosure in this one, though. It's just
a fence and then it's to screen the
[2:12:26]
garbage can. So, we didn't really call
it a garbage enclosure. It doesn't have
[2:12:30]
sides, doesn't have doors, it doesn't
have a lid.
[2:12:34]
» Yeah, but I
>> Yeah, I I I mean, I think we should look
[2:12:38]
at this to see what the current revol I
don't know. Or do you think that that
[2:12:43]
the city council would wouldn't
[2:12:47]
You know, I don't know. It's just that
it's just that if we move the the
[2:12:51]
garbage enclosure down into the
property, the the slope is so steep it's
[2:12:56]
not practical.
>> Um Okay. And then
[2:13:00]
» and the other and the other benefit, by
the way, and I don't know how much value
[2:13:04]
this has, but when we moved the the when
we built the new fence and we moved it
[2:13:08]
onto the property, it revealed where 125
Belvadier has some utility hookups and
[2:13:14]
stuff. Now, if we keep our our garbage
screening where we want it, we screen
[2:13:19]
all of that utility. And so, what
happens is I think it's a benefit
[2:13:23]
because we're also widening Belvar
Avenue so much. It's kind of a averaging
[2:13:29]
where you're you I think you're getting
more and it's a better design if we keep
[2:13:33]
the garbage where we where we propose
it.
[2:13:36]
» Okay. Um and then I wanted to ask too
about the fence that's proposed up at
[2:13:41]
the street level. Um I understand that
the purpose of the fence is for public
[2:13:46]
safety and I think it's super it's very
important because of the uh drop off
[2:13:49]
there.
I just wonder uh the the fence uh it
[2:13:54]
appears from grade level at the street
it's about four and a half feet high. I
[2:13:59]
wonder if it needs to be that high to
provide public safety. Um it seems a
[2:14:04]
little high.
>> Is it six feet off?
[2:14:06]
» It's six feet from where the grade is
where it's built and then but the
[2:14:10]
section shows uh from the street level
it's about about four and a half ft
[2:14:14]
high. I I just don't know if it needs to
be that high. Um,
[2:14:18]
» I wish I included that graphic we had.
We had I mean because the property line
[2:14:23]
is
>> Can you get closer to the mic?
[2:14:26]
» I think the property line's about seven
or eight feet off the edge of the road
[2:14:30]
down slope.
>> When you have this sixoot fence, we were
[2:14:36]
» down well, you could easily see over the
top and with the 4ft vegetation would it
[2:14:43]
would nearly seem as though it wasn't
there. But the the design of it
[2:14:48]
and and then this is something that we
have to work on probably a little bit.
[2:14:52]
But is that the base of that would be
very stout like there's a there's a
[2:14:56]
plate and then we have these pickets
that rise up
[2:14:59]
» and the the intention is that if a
vehicle were to you know edge off the
[2:15:04]
edge of the road they couldn't make it
>> past that that barrier.
[2:15:10]
Um, this was a a just kind of a sketch
study
[2:15:15]
looking at moving a trash enclosure off
the rightway and in onto the property
[2:15:23]
entirely. And what I was pointing out is
that the contour line,
[2:15:30]
say the midpoint contour line is around
130 and we're at 138.5. So it's 8 and
[2:15:37]
1/2 on average 8 and 1/2 ft up in the
air and and and so that and in order for
[2:15:43]
you to then be able to roll a can not
going up or down stairs or up a ramp
[2:15:49]
more or less across and put it in the
street for pickup. And so uh it seems
[2:15:56]
like a lot of construction. It's it's
making a lot of construction right
[2:16:01]
there. Um, and so then since we already
had the revocable license, we were
[2:16:05]
hoping that we wouldn't have to build so
much in that particular location.
[2:16:12]
» Okay. And then and then to follow up too
about the the fence, I you know,
[2:16:16]
» the height of the fence, it's a sixoot
fence and it's the you know, it's the
[2:16:21]
fin style metal pickets and I suppose it
could be a five foot fence or something
[2:16:25]
in that ballpark, but I would want you
would want it to be a certain height.
[2:16:29]
» Yes. Yeah. [laughter] Yeah. No. And I I
was, you know, in prepare preparing for
[2:16:33]
this, I was looking around, you know,
like guardrails on the freeway, which
[2:16:36]
keep cars from going over. They're at
about 3 ft high, but um I uh I you know,
[2:16:44]
I was imagining cars at night coming
around the curve. You you want
[2:16:47]
definitely want a visual barrier. Um so
I'm not saying the fence has to be from
[2:16:52]
street level 3t high, but I don't think
I don't know that it needs to be four
[2:16:55]
and a half ft high. It's pretty tall. I
mean, it's probably about this height
[2:16:59]
here. And the my my only point is with
the uh revocable license requirements is
[2:17:05]
that there's an intent to really not
have public land look appear to be
[2:17:10]
privatized by things like fences or
>> well this particular part of the fence
[2:17:14]
is on the property line because the
retaining wall for the driveways on the
[2:17:17]
property line. So this fence would sit
on top of the that's why it's this
[2:17:21]
style.
So the retainable curves and so these
[2:17:26]
elements so it's really not in in the
city property
[2:17:30]
» um is it portion of the revocable
license for the fence
[2:17:33]
» for the wooden fence by the trashing
>> okay
[2:17:37]
» yeah the uh the vertical kind of picket
style fence is entirely on the property.
[2:17:43]
Okay. Thanks. Thanks.
>> Um, and the the plan is to to screen the
[2:17:49]
fence with uh with vegetation as well.
Correct.
[2:17:53]
» I don't I don't think my intention was
to screen the fence in in particular,
[2:17:59]
but to have vegetation in the front,
more for aesthetic uh purposes. I I
[2:18:04]
didn't think that the that I thought the
fence would be attractive and it's it's
[2:18:10]
sort of a definition of space. So, Um, I
I didn't think that that was the
[2:18:16]
purpose.
[2:18:30]
» Did you Did you have any additional
questions?
[2:18:35]
» Just had some questions about the amount
of glass on the on the back of the of
[2:18:41]
the house. Um, I I know that this is,
you know, the
[2:18:48]
the glass and then the inter and the
interior lights are not necessarily
[2:18:52]
going to be seen by other other members
of the Belvadier community, but I just I
[2:18:57]
want
I guess I want I want to ask like is is
[2:19:01]
this house going to be a a giant shining
beacon for the people of Salo?
[2:19:08]
Well, what we what we've done is we've
introduced, you know, wood lettuce
[2:19:12]
screening on portions of the glass
actually quite a bit. Um, and the other
[2:19:18]
thing I was considering I'm
we'd use [clears throat] it in Lake
[2:19:21]
Tahoe is non-reflective glass, which
might be a consideration.
[2:19:29]
» [clears throat]
>> Yeah, I think that would probably be be
[2:19:32]
good just for for the folks out out on
the water and for our slightly farther
[2:19:37]
away neighbors.
[2:19:50]
[snorts]
>> All right.
[2:19:54]
No further questions from planning
commission. Um, would anyone in the
[2:19:58]
audience like to make a comment? Please
come forward.
[2:20:04]
[clears throat]
[2:20:07]
» Uh, good evening, commissioners. My name
is Steve Silverstein. I live at two at
[2:20:12]
one cliff road. I'm a 30-year resident
of Belvadier, and I have walked by this
[2:20:18]
street uh hundreds or thousands of
times. in them. I am one of the people
[2:20:23]
who is really excited that that fence
has come down. Uh it's just like a whole
[2:20:30]
new world here. Like we u I really
appreciate the people behind this of
[2:20:37]
moving the fence away from the street
down [clears throat] uh down the hill.
[2:20:42]
The top of the fence is below the street
level. They did that for about three
[2:20:49]
quarters of the fence and then one
quarter of it they did it the way the
[2:20:54]
old fence is as it's closer to the
street and it's it's that old uh tunnel
[2:21:00]
effect. So you almost have the before
and the after still still there.
[2:21:06]
I hope that uh in all our deliberations
here that we make a condition that the
[2:21:11]
top of the fence be below the street
level. So, I don't care if the fence is
[2:21:17]
four feet, five feet, six feet, seven
feet, just so long as the top of it is
[2:21:22]
below the street level. I think they uh
submitted a uh in the architectural uh
[2:21:28]
uh things that were submitted to the
city, there's a shot here. It's in the
[2:21:33]
lower right hand corner. you see a
couple of uh people walking or running
[2:21:38]
along the uh along the street and you
can see that the there's no you can see
[2:21:43]
the the garbage uh container over in the
back but for the whole front of the
[2:21:49]
property there's no the fence is below
the street level. So, I hope that that's
[2:21:54]
what uh is in the plans all the way up
to the uh to the the driveway which is
[2:22:00]
on the the left side as uh as we know
there. So, that that will be a great
[2:22:05]
improvement. And I was so super pleased
to hear that the roof is going to be
[2:22:09]
green because you're going to look down
on top of the roof and you're going to
[2:22:13]
see some nice uh uh plants there. It
it's going to be really uh really
[2:22:18]
beautiful with that. So, I I commend
this is like our fourth time on this uh
[2:22:24]
thing here uh that this one gets done
and it gets done this way and we'll all
[2:22:30]
be grateful for it. So, just make sure
that that happens. Thank you.
[2:22:37]
» Thank you.
Is there anyone else present that in the
[2:22:43]
room that would like to speak here?
[2:22:48]
Any hands raised on Zoom?
>> No hands raised.
[2:22:52]
» Okay. Um I I wonder um regarding the
last comment if I could have the
[2:23:00]
applicant uh come forward and just talk
about this idea that the top of the
[2:23:06]
fence should be below street level. What
what would be involved in that? Is that
[2:23:10]
possible? Um
>> I don't I I don't have
[2:23:16]
We'd have to Well, there's a vertical
drop and it so it has to be 42 inches
[2:23:20]
above. Um [clears throat] so I don't
know if that how that relates to street
[2:23:24]
level,
>> right?
[2:23:25]
» But it has to be 42 in um minimum.
>> Correct.
[2:23:29]
» Yeah. And so right now
>> so I I sort of know and this question
[2:23:34]
can't perhaps cannot be answered because
>> right now it's 72 in. It has to be 42.
[2:23:39]
Yeah. Yeah.
>> And it could be somewhere between 72 and
[2:23:42]
42. And the other thing I'd like to
point out is the only reason that that
[2:23:45]
existing part is still where it was
before is a practical matter. And when
[2:23:50]
the new fence is in, that is totally
gone and we're back to that line that
[2:23:54]
continues.
>> The excuse me, but the the new the fence
[2:23:58]
is metal, isn't it? The new fence that
you can see through,
[2:24:00]
» right?
>> So it doesn't really
[2:24:03]
» block off any So if you're walking by,
you can see through it also. and and
[2:24:07]
since it's curved in the way it's
designed, it sort of changes as you move
[2:24:10]
through the space. So that's why, you
know, John was saying it's an
[2:24:13]
architectural element. The planting is
sort of a base or foreground in front of
[2:24:17]
this architectural
>> element.
[2:24:20]
Okay.
>> Thank you.
[2:24:23]
I do think it's important
>> you don't see the fence
[2:24:35]
» in the picture that they submitted. You
don't see the fence. Okay. The top of
[2:24:40]
the fence is below the street level,
right? It's not a problem.
[2:24:46]
Okay. That's what they submitted. The
site is vertical enough [clears throat]
[2:24:52]
to do it. So, let's just do it.
[2:25:03]
» Um, did you did you have something to
say?
[2:25:10]
I the the concern I I I I can't answer
this question because I don't I didn't
[2:25:16]
memorize the the grade location relative
to the street and perhaps as we get
[2:25:23]
where the metal picket meets a wooden
fence. There could be a zone in there
[2:25:28]
where even 42 is higher than the street
level. It's it's likely. Um certainly
[2:25:33]
not where the vehicle gate is. We we
know it descends down some distance.
[2:25:38]
were already going down the driveway.
So, this fence does [clears throat] have
[2:25:42]
both a curve and a downward suite as you
come around. Uh, so, but I I can't
[2:25:50]
answer the question technically, but I
also would like that fence to look kind
[2:25:56]
of beautiful from above and below. In
other words, having a gradation that is
[2:26:02]
uniform. But I I our our in we have no
benefit for seeing the fence. So, you
[2:26:09]
know.
>> Okay.
[2:26:10]
» That's good. Thank you. I'm just trying
to get the picture here.
[2:26:19]
» Um if nobody here has any further
comments, I'll close the public hearing
[2:26:25]
and bring it back to the commission for
discussion.
[2:26:31]
Um, Commissioner Laskkey, would you like
to begin the discussion, please?
[2:26:37]
» Um, this is actually, as you mentioned
in the audience, um, this is the third
[2:26:42]
time that I have looked at a project
for, um, this site, so I think that I
[2:26:48]
would be thrilled to see um, a house
built there. Um, and also, um, it really
[2:26:54]
does this where you're sighting the
house below the hillside and also with
[2:26:59]
the green roofs really makes it fit in
to the terrain and disappear basically.
[2:27:06]
And it's wonderful to be able to walk
along now and look over the fence and
[2:27:12]
where the stray poles are, you can look
over. So that's where the house um is
[2:27:17]
going to be. Um,
[2:27:24]
and the other advantage of having the
garage below the road is you're not
[2:27:28]
looking at garages. And it's very
attractive to have the garage below the
[2:27:33]
road. So, we're not looking at a garage
sitting um on the road.
[2:27:41]
It doesn't the hum does not draw
attention to itself at all because it's
[2:27:46]
below the road. and the screening that
are on both um of the property lines
[2:27:53]
give privacy. Um and I like the fact
that um the landscape architect added
[2:27:59]
some pod carpus on the road that also
will give some green and some some tree
[2:28:06]
and shade there. Um it will break up the
view a little bit. Um the wood and the
[2:28:13]
materials I think are really beautiful.
the wood louvers
[2:28:17]
um that were added actually to some of
the windows. So that would screen some
[2:28:23]
of the light and the windows that you
would look at from Salelo and or from um
[2:28:29]
the water. It softens the house. So I
can make the findings for design review.
[2:28:35]
I would have liked to have seen the
colors of the materials tonight,
[2:28:40]
especially the cement. Maybe to be sure
that the cement is not too
[2:28:46]
um white. I think the color was a um
um can't remember now it was a buff but
[2:28:55]
to be sure that it's not you know white
um
[2:29:02]
and I can make the findings for
demolition there are no hysterical not
[2:29:06]
hysterical but historical architect
maybe hysterical too. um significance.
[2:29:12]
Um it's really great to clean, you know,
clean up the lots. I am concerned about
[2:29:18]
the truckloads. So that's something I
think the city can look at. Yeah, it's
[2:29:23]
called buff or something. The concrete,
[clears throat] I think.
[2:29:28]
Um I can make the findings also for the
revocable license. I I don't know.
[2:29:36]
[clears throat]
I was asking whether there is an
[2:29:38]
existing one because I didn't know
whether you could just add a new one for
[2:29:44]
the parts that aren't included in the
old one. I don't know um how that how
[2:29:50]
how that you could do that. But
[clears throat] um it is practical to
[2:29:55]
have the garbage container there. Um, so
I that that really is is an ease and
[2:30:02]
that doesn't really bother me. Um,
and you are increasing the space of the
[2:30:08]
road by seven feet 9 in which is um
actually a great advantage to give more
[2:30:17]
parking. And so that is um um really a
public uh favor to add more parking and
[2:30:27]
increase the size of the road.
Otherwise, you know, it kind of drops
[2:30:30]
off there.
Um [snorts]
[2:30:35]
yeah, and having the metal fence
see-through, I think, is an advantage,
[2:30:39]
too, because it gives air and um
doesn't close off the whole property.
[2:30:47]
Um I can make the uh findings also for
the exception to floor area. Um this lot
[2:30:54]
is three times the size of a normal lot
size. The primary views are not impacted
[2:31:02]
from adjoining properties and it will
also not reduce privacy um in adjoining
[2:31:08]
properties. It's and the way the house
is set on the on the hillside, it really
[2:31:15]
sits into the slope which decreases the
mass and bulk of it. Um, and in the
[2:31:22]
years after it'll be completed, it
certainly will improve the views uh from
[2:31:28]
the street.
And the new landscape screening also um
[2:31:33]
is good for the neighbors and good for
the um uh neighborhood all around.
[2:31:40]
I do I I would like to add also a
condition for tree protection because
[2:31:46]
there are some trees that need to be
protected during the construction. some
[2:31:50]
of the old oak trees. And actually, I I
actually forgot to mention to John, but
[2:31:55]
I can give the city there are three or
four trees um I have the numbers of that
[2:32:01]
look like things can be adjusted by a
foot or two and you could keep these oak
[2:32:07]
trees. So, um they are
um [clears throat]
[2:32:14]
number 28 and number 30. One's near a
boat house and one's near the ADU. But
[2:32:21]
it would be good to take a look at some
of these large oak trees that you are
[2:32:25]
taking out. And sometimes it just means
a difference of a foot on the building
[2:32:32]
to be able to keep um some trees and
that should be looked at.
[2:32:52]
Those are my comments. Thank you.
[clears throat]
[2:32:57]
» Thanks. Um, Commissioner Wilson, please.
>> Yeah, thank you.
[2:33:04]
» [snorts]
>> Um I just wanted to say that um I also
[2:33:07]
can make the design review findings for
this project um
[2:33:12]
uh with the changes with the lighting
that are proposed and um you know the
[2:33:16]
mention of the glazing that will be
non-reflective. I think that will be
[2:33:20]
very helpful. Um the project is
compatible with the the surroundings. Um
[2:33:26]
and then as far as the demolition permit
I can also make the findings for that.
[2:33:31]
um you the demolition of what's on the
site will not be detrimental to the
[2:33:35]
city. Um as far as adopting the
resolution for the exception to total
[2:33:40]
floor area, um I also agree with the
previous commissioner's findings um that
[2:33:46]
uh primary views are protected. Uh
privacy as well is not impacted and the
[2:33:50]
views from the street are also
protected. And finally, for the
[2:33:54]
revocable license, uh, I would like to
know if I would like the applicant to
[2:34:00]
consider moving um the garbage off out
of the revocable license request. I'm
[2:34:06]
not I don't want to make it a condition
of approval. Um, but on balance, I do
[2:34:10]
think that the um uh the amenities that
are being provided with the project uh
[2:34:16]
support avocable license as well. Thank
you,
[2:34:22]
» Commissioner Watson, please.
>> Thanks. Um, I too think that this this
[2:34:27]
this project um even even if it wasn't
replacing what is currently a coyote
[2:34:33]
habitat would be a great benefit to our
uh to our community and to our island.
[2:34:38]
Um I um I also walk walk past this uh
this lot all the all the time as I live
[2:34:44]
on that side of the island and really
appreciate the the opening up of the
[2:34:49]
view already. Um it's uh it's very nice
to see something that you didn't know
[2:34:54]
you were going to get. Um you know and
especially since it's a f it's a
[2:34:58]
fantastic view. Um um I can make I can
make the findings clearly clearly for
[2:35:05]
clearly for demol for uh for for the for
the dem for the demolition. Um and also
[2:35:10]
for the exception to total total floor
area. Um, as the other commissioners
[2:35:15]
already pointed out, uh, until very
recently, this was actually three lots.
[2:35:20]
And, um, if you assume that it is still
still three lots, it actually would
[2:35:26]
wouldn't have need wouldn't have needed
a an exception to total floor area. Um
[2:35:31]
and also the way that the way that it's
uh it's cited as um does provide privacy
[2:35:38]
a and a sort of a a green look as well
as well as providing views for the
[2:35:44]
community. Um I also appreciate uh the
addition of the ADU and the Jedu so that
[2:35:50]
there are still three housing units that
are on that are on this this uh this
[2:35:54]
this this property.
Um, I can also make the findings for the
[2:35:59]
revocable license, um, including the
garbage enclosure. Um, as it looks as
[2:36:06]
though they're that it will have like
the lowest height practicable for for
[2:36:11]
actually hiding the hiding the garbage.
Um,
[2:36:16]
my 16-year-old son is supposed to be the
one to take the garbage out up our
[2:36:20]
steep, you know, fairly steep driveway.
He does not. It is me. And so I I will I
[2:36:25]
I understand just what a pain it is to
haul garbage around. Um and then um I
[2:36:34]
appreciate uh Commissioner Lask's um
proposal of reviewing plans for the
[2:36:40]
protection of of trees number 28 and and
and 30. Um, one of the only things that
[2:36:46]
I didn't like about this plan was the
the number of large old trees that are
[2:36:51]
being removed. Even though I understand
that a number of them um are both
[2:36:57]
damaged, disease, past their prime, and
should be should be removed for fire
[2:37:01]
purposes and also uh within within the
floor plan of the of the proposed house.
[2:37:07]
Um I would like to condition uh the
approval on uh for the um for the design
[2:37:16]
review on the reduction of the out of
the outside lighting um as you already
[2:37:21]
dis discussed this evening um as well as
the protection of the existing and rema
[2:37:28]
and remaining large trees during uh
during construction. This is something
[2:37:32]
that we've provided on a number of uh of
new of new house builds. Um and also on
[2:37:38]
having non-reflective glass on the on
the large large panel large panels of
[2:37:42]
panels of glass um on the on the house.
Um and then the approval of the final
[2:37:50]
lighting lighting plan by
[clears throat]
[2:37:52]
the
um by the chair and the
[2:37:56]
» lighting and landscape.
>> Yes, lighting and landscape. Thank you.
[2:38:06]
Uh so I uh I will echo um my fellow
commissioners um feelings about this.
[2:38:13]
I'll try not to be too redundant, but
just highlight a couple of um things
[2:38:18]
that I observed. Um it was pretty
interesting um upon visiting the site to
[2:38:25]
see the way the story poles situate
themselves in the site. um and also the
[2:38:31]
the distance and the existing vegetation
that's going to be between this rather
[2:38:38]
large house and the adjacent neighbors.
So, um I I very much appreciate the the
[2:38:46]
way the building has been designed and
situated into the site. I think the
[2:38:50]
colors and materials are good. I also
think it's hard to design a really
[2:38:55]
attractive very large house. I guess
that's speaking from, you know, as an
[2:38:59]
architect. It's not an easy job and I I
think that um a very good job has has
[2:39:05]
been done here. So, I'll be able to make
the findings for design review. Um I'll
[2:39:11]
also be able to make findings for
demolition.
[2:39:15]
Um, again, in terms of um floor area
exemption, um, the things I just
[2:39:21]
referenced, the way the house relates to
its lot, its neighbors, vegetation, um,
[2:39:29]
all good. So, I can make the findings
for additional floor area. Um, and I'll
[2:39:36]
be able to make findings for revocable
license. Um I um appreciate Commissioner
[2:39:43]
Lasky's um input to the applicant on
trees. I also had a concern about um the
[2:39:51]
number of trees being removed. Um I
don't think we're looking for a onetoone
[2:39:56]
replacement at this point, but I do
think the additional landscape
[2:40:00]
improvements that you've described are
are good. Um I also u want to say to the
[2:40:08]
neighbor who's interested in the fence
height, I think that can be subject of
[2:40:13]
of review. Um which will landscape and
lighting and fencing will come back to
[2:40:21]
me. So at that time I'm going to try to
keep your comments in mind and see what
[2:40:26]
we can do and just urge you to do what
you can to keep the fence as as minimal
[2:40:32]
as it can be. Having said that, I like
the idea of what the fence design is
[2:40:36]
with the the see-through slats.
So, I think we'll end up at a good
[2:40:42]
solution at the end of the day. And I
appreciate your comments.
[2:40:47]
So, um, with that, I think we're ready
to get
[2:40:52]
some motions on the floor and some
conditions of approval. Anyone want to
[2:40:57]
take a shot at that?
[2:41:06]
So, I'm going to go a little bit out of
order, just the easy ones first. Um, I'd
[2:41:11]
like to propose a propose a motion to
adopt a resolution granting a demolition
[2:41:16]
permit to demolish the existing 3,764
ft single family dwelling unit at 135
[2:41:25]
Belvadier Avenue. I'll second the
motion.
[2:41:30]
All in favor?
>> I I
[2:41:33]
» All right. Um I'd like to propose a
propose a motion to adopt a resolution
[2:41:38]
granting an exception to total floor
area to allow an 11,223
[2:41:44]
square ft house where a 4,850
[2:41:49]
square ft uh house is permitted at
number 135 Belvadier Avenue.
[2:41:55]
» Second.
>> All in favor? I
[2:41:59]
» I
>> um for the revocable uh license, this is
[2:42:04]
just a recommendation. Um so I'd like to
propose a motion to recommend the city
[2:42:09]
council approval of the revocable
license for the private improvements
[2:42:13]
located in the Belvadier Avenue right
ofway at 135 Belvadier Avenue.
[2:42:19]
» Second.
>> All in favor?
[2:42:22]
» I I
>> All right. Um, and now for the motion
[2:42:27]
for design review.
Um, I would like to propose a motion
[2:42:31]
adopting a resolution granting design
review to construct a new single family
[2:42:35]
residence and attached garage number 135
Belvadier Avenue with the following
[2:42:41]
conditions. Number one is that the staff
and chair Sidell um approve the
[2:42:47]
landscape and lighting and lighting plan
uh for the house prior to the uh
[2:42:54]
building permit.
Number two, to provide uh protection to
[2:43:01]
we'll call it the the old and larger
trees dur during during construction and
[2:43:06]
also to review the tree plan uh as to
whether or not trees number 28 and 30
[2:43:12]
couldn't be kept.
[2:43:16]
And then number three is
um to have non-reflective glass on the
[2:43:22]
large panels of glass on the upper story
of the back of the house. How does that
[2:43:28]
sound?
[2:43:34]
» Good. All right. I'll second.
>> We're not I don't think we're finished
[2:43:39]
yet, are we?
>> That was that I only had one, two,
[2:43:41]
three.
>> Oh. Um
[2:43:43]
» what are we missing? Do we need to um
say something about that light fixture
[2:43:48]
that needs to be changed out?
>> Um I thought that was going to be under
[2:43:51]
the lighting plan.
>> Oh, it can't. That's fine. Okay, then I
[2:43:56]
can cross that off my list. So So that's
the So we have a complete motion.
[2:44:05]
» I'll second the motion.
>> All in favor? Hi.
[2:44:09]
» Hi.
[2:44:21]
» Okay. Uh, thank you everyone. I'll now
adjourn the meeting.