[0:00]
Yes.
[0:01]
>> Yeah. So, essentially this is Robert's
[0:04]
purchases and Cory's maintenance and
[0:06]
purchases as well. It makes up that $13
[0:08]
million.
[0:10]
Um, so next slide, Adam is proposed
[0:14]
elementary school debt payments. We need
[0:16]
a loan to build these schools. We don't
[0:17]
have $55 million in reserve to build the
[0:19]
schools. We need a loan. So, I'll talk
[0:22]
about the detail of that later. $4.4
[0:25]
million.
[0:27]
In my conversations with lenders, it's a possibility they want us to put
[0:31]
essentially a reserve fund in case of
[0:33]
non-payment and they want us to
[0:35]
potentially have about a $4.5 million
[0:37]
reserve fund established.
[0:40]
It's kind of like when, for example,
[0:41]
when I built my house, that construction
[0:43]
loan, the bank asked me to put a large
[0:46]
sum of money, $30, $40,000 into their
[0:49]
bank that they held that I couldn't
[0:50]
access until my loan was paid off. Same
[0:53]
concept. It's our money. they can't use
[0:56]
it, but they want to hold in reserve in
[0:57]
case we non-perform our loan. Not going
[0:59]
to happen, but that's part of the
[1:00]
unwritten process at the bank. I'm
[1:03]
working with them on that to hopefully
[1:05]
not have that, and I think I made
[1:06]
progress on that, but this is worst case
[1:09]
scenario.
[1:17]
I was asking a question about um can you
[1:20]
tell me again what loan we're talking
[1:22]
about for the
[1:24]
>> for the Discovery Elementary and West
[1:26]
Tremont elementary school builds
[1:28]
>> total amount of that
[1:30]
>> about $55 million.
[1:33]
I'll have a slide on that. I'll go into
[1:34]
that detail at a later point here.
[1:39]
uh secure vestables. So HB84 back in
[1:42]
2003 required
[1:45]
uh school districts in any school really
[1:47]
to secure their front entrances called a
[1:49]
secure vestible, a place where they can
[1:51]
contain visitors that can't get into the
[1:52]
main part of the building without
[1:54]
verifying their identity uh and be
[1:57]
basically a secure area. Uh we have some
[1:59]
schools that are challenging to to
[2:02]
construct those that require significant
[2:03]
capital investments. We're forecasting
[2:05]
about $2.6 million. We haven't designed
[2:08]
those yet. That's just our best guess
[2:10]
based on what we know might need to
[2:11]
happen.
[2:13]
Um, security sewer preventive
[2:15]
maintenance. Right now, we're working
[2:17]
with our construction managers to
[2:19]
inspect all our sewer lines with a
[2:21]
camera, determine where they might be
[2:23]
failure points. And this is to fix those
[2:26]
failure points so later on during school
[2:29]
hours or in the future we don't have
[2:31]
broken lines. This is preventing the
[2:33]
maintenance. kind of like taking your
[2:34]
car to the mechanic and have them do a
[2:36]
once over and check everything that
[2:38]
needs to be lubed or replaced, tires,
[2:41]
oil, uh, washer fluid, all those things.
[2:43]
That's what we're doing for our sewer
[2:44]
system to prevent that. Yes.
[2:46]
>> Does that amount does that amount
[2:50]
include um just finding out or does that
[2:53]
include the maintenance?
[2:55]
>> This is the repair. So, the finding out
[2:56]
we're doing right now in this fiscal
[2:57]
year with existing budgets.
[2:59]
>> Okay. Thanks.
[3:02]
Um then next we have air conditioning
[3:04]
installation. Now I have detail on these
[3:06]
line items in different slides, but this
[3:08]
is an overview. Um $5.1 million to air
[3:11]
condition the remaining parts of our
[3:12]
school district. So every building has
[3:14]
air conditioning. We know that was a a
[3:16]
um priority for the public in our
[3:18]
surveys. So we're putting forward
[3:19]
existing capital funds to do that.
[3:22]
Uh school bus purchases. So we refresh
[3:25]
our school bus fleet as buses age out.
[3:27]
Currently, we're doing about a million3
[3:30]
to a million5 per year. So, this is that line item for that those purchases.
[3:35]
Then, we take the older buses, we go
[3:36]
sell them at auction. A lot of times we
[3:39]
get 8 $10,000 for a school bus. Not a
[3:42]
lot. We use them till they till their
[3:44]
maintenance costs more to operate than
[3:46]
it is for us to buy a new school bus.
[3:49]
A biggest thing on school buses, the
[3:51]
problem is emissions items. So, they're
[3:54]
all diesel vehicles. So, the diesel
[3:56]
particulate filters and the diesel
[3:58]
exhaust fluid uh system are very costly
[4:00]
to replace. So, when we get to that
[4:02]
point where we're looking at a 40 or
[4:04]
$50,000 repair in parts, it's that time
[4:06]
to replace that bus.
[4:10]
Um, district vehicle purchases.
[4:11]
Currently, we don't have a plan for
[4:13]
purchasing district vehicles as they age
[4:15]
out. And this is for what we call our
[4:17]
white fleet suburbans, vans, cars that
[4:20]
are used around our district to
[4:21]
transport students and staff for their
[4:24]
different responsibilities. Um, as I
[4:26]
mentioned earlier, we have some
[4:27]
suburbans that are 200,000 miles. That's
[4:29]
pretty that's pretty high for a vehicle
[4:31]
that depends on to transport students
[4:33]
around the state. So, as these age out,
[4:36]
we will buy new vehicles, sell the old
[4:38]
ones at auction, but this is a line item
[4:40]
to to purchase those as we need
[4:42]
throughout the year.
[4:46]
Um, Bay River High School improvements.
[4:50]
>> Oh, you have a question?
[4:54]
» I was just curious if that was the same
[4:55]
budget for the driver's ed cars or
[4:58]
>> It could be.
[4:59]
>> Oh, yeah.
[5:00]
>> Yeah. So, we can um move driver's ed
[5:03]
cars into the fleet and buy new driver's
[5:05]
ed cars. We try and use these vehicles
[5:08]
as much as we can till they start
[5:09]
costing us money extra for maintenance
[5:12]
or we feel like they're unsafe. So, we
[5:14]
try and for our larger vehicles are
[5:16]
trucks that are in CTE or maintenance
[5:19]
vehicles, they're about 150,000 miles
[5:21]
that we start to move them on. Other
[5:23]
vehicles, the sweet spots right about
[5:25]
100,000 miles where they still have
[5:26]
decent amount of value, but they're not
[5:29]
starting to fall apart so much need
[5:30]
maintenance.
[5:32]
>> Just a question or an answer about
[5:34]
driver's ed cars. We used to have a a
[5:36]
state uh grant that brought about
[5:39]
$60,000
[5:40]
uh annually and that grant was
[5:42]
eliminated. And so we would buy about
[5:46]
two cars and kind of replace the oldest
[5:50]
two. And so that would be kind of the
[5:52]
rotation. So now that that's gone, then
[5:54]
we're going to have to find a way to run
[5:57]
them, sell them, and use some general
[6:00]
funds to kind of help that.
[6:04]
12
[6:08]
13.
[6:09]
We're at 13.
[6:12]
>> Another thing about driver's ed vehicles
[6:14]
that they have some special equipment
[6:15]
inside them that about 10 to $15,000
[6:18]
extra for the passenger side brake and
[6:20]
things like that. There's other things
[6:21]
that go into those vehicles.
[6:25]
>> I mean, I I learned to drive without the
[6:27]
passenger side brake, but I'm sure most
[6:29]
today they appreciate it.
[6:32]
All right. Um, playground budget again,
[6:35]
4,000 five $500,000
[6:38]
total expenditures and most these are
[6:39]
onetime expenditures are $39 million.
[6:46]
» So, the high school,
[6:57]
>> we'll get to that. I have a slide for
[6:58]
that.
[7:02]
This is this is a we've not voted.
[7:06]
>> No, this is a proposal for us to
[7:08]
discuss.
[7:10]
>> Right.
[7:10]
>> Yes.
[7:17]
» I think when I met with you the Bear
[7:19]
Ridge High School improvements haven't
[7:20]
been fleshed out yet, so that wasn't on
[7:21]
there. That probably is new for you.
[7:23]
>> And that's the same for all of us.
[7:26]
>> Yeah.
[7:29]
So budgeted fund balances question mark
[7:30]
because we don't have a budget yet. When
[7:32]
we pass that budget in June, we'll have
[7:34]
a number there. Um estimated funding
[7:36]
balance based on this work here is $14
[7:39]
million. Remember we have $4.5 million
[7:42]
set aside for debt reserve. So really it
[7:44]
will be about $18 million.
[7:47]
Um I'm I'm pretty sure that's what we'll
[7:48]
end up at. I don't think we'll have to
[7:50]
have that debt reserve.
[7:54]
So, our fund balance history in 2020, I
[7:57]
went back to there. $23.8 million is
[8:00]
what our fund balance was there. In 21
[8:03]
went to $31 million. What happened in
[8:05]
21?
[8:06]
We got a loan for Golden Spike. So, the
[8:09]
money got got deposited there. Um, so
[8:13]
that went up, but it's earmarked for
[8:14]
construction only. Then we built Golden
[8:17]
Spike and it went down to $17.5 million.
[8:20]
Golden Spike was a $15 million loan. The
[8:24]
$25 million build when you factor in all
[8:26]
what we call FFN fixtures, furnishings,
[8:28]
and equipment that goes inside the
[8:30]
building. All your school lunch stuff,
[8:32]
all your desk, your chairs, computers,
[8:34]
um furniture in the office, all that.
[8:37]
And that total bill was $25 million.
[8:40]
So, we did about $10 million out of our
[8:43]
regular fund balance and 15 from alone.
[8:48]
» Any other questions?
[8:58]
uh West Treemont, we're we'll be about
[9:00]
nine years later by the time we start
[9:01]
construction.
[9:03]
So, great question. So, that cost to
[9:05]
build that school um as designed in 2017
[9:10]
was $17 million. No, it's 20 2021 when
[9:18]
>> Well, I'm okay. I
[9:21]
>> Yeah, I'm trying to compare Westmont to
[9:22]
Westmont then. Same building footprint,
[9:25]
$17 million. Today, same building
[9:27]
footprint, $ 35 to $40 million. We're
[9:30]
not done with engineering yet because
[9:32]
engineering standards change. So, it's a
[9:33]
little that's a wild card we have to
[9:35]
deal with there.
[9:37]
Any questions?
[9:40]
Okay.
[9:42]
So our low point was 2022 17.5. Then we
[9:45]
started building fund balance as we go
[9:47]
through. Um
[9:49]
one of our bigger jumps right here was
[9:53]
due to there's a tax increase that was
[9:55]
passed by the board in 2023. So we have
[9:58]
a jump here about $4 million. There's a
[10:01]
bigger jump here. Um this mostly due to
[10:05]
construction projects that we that
[10:06]
didn't materialize and additional uh tax
[10:10]
funds mostly from our fee and loo and
[10:12]
other taxing our flat taxes that we get
[10:14]
that aren't part of the property tax
[10:16]
calculation.
[10:19]
So then we're going to end up
[10:20]
potentially
[10:22]
in end of this year end next year about
[10:24]
$14 million if we do all these projects.
[10:28]
really 18 million when you factor in the
[10:30]
debt service reserve, but I'm
[10:32]
forecasting for worst case scenario
[10:33]
here. You have any questions on this?
[10:40]
» Is there an amount we're supposed to
[10:42]
have recommended amount?
[10:44]
>> There's not.
[10:45]
And that's been a question
[10:46]
amongst business administrators across
[10:47]
the state asking what is your
[10:50]
recommended policy? What is there a
[10:51]
policy on your board for how much
[10:53]
percentage of cost you have in here? And
[10:56]
there's not because
[10:58]
districts are usually doing construction
[11:01]
or maintenance projects across the year
[11:04]
and their maintenance schedule or
[11:05]
construction schedule may vary. So when
[11:07]
you sell a bond or you borrow money, it
[11:10]
goes into this fund. So it may look like
[11:12]
a huge balance like we had in 21 $31
[11:14]
million, but half of that was earmarked
[11:17]
for construction.
[11:19]
So it's it's hard to have a recommended
[11:21]
ongoing fund balance in this fund
[11:23]
because of that. We could break out to a
[11:25]
different fund and sure we could have a
[11:27]
board target but there really isn't a
[11:29]
standard across the state for that
[11:31]
target because this all depends on your
[11:33]
facility and maintenance needs.
[11:36]
>> Yes. Clarification talk about the need
[11:38]
for
[11:39]
the 5%.
[11:41]
>> Oh yes
[11:42]
>> I don't know if that's part of it. Um
[11:45]
yeah so the general fund balance so
[11:47]
operational fund that's basically that's
[11:49]
what our mission is to teach kids all
[11:52]
the funds that support that called
[11:53]
operation or fund 10 fund 10
[11:57]
the targeted balance by the various
[12:00]
organizations that I belong to
[12:02]
government finance office association uh
[12:05]
gazsby government accounting standards
[12:06]
board and various Utah public treasures
[12:09]
association 25% of operational cost
[12:12]
should be saved in the reserve
[12:14]
That's essentially three months
[12:15]
operational cost. Yeah. So three months,
[12:18]
one quarter.
[12:20]
Uh that is consistent of what people
[12:22]
preach in personal finance. Have three
[12:24]
months of expenses saved. Uh for us
[12:27]
that's about $32 million.
[12:30]
Uh we ended last year in the general
[12:32]
fund, not listed here, but in the
[12:33]
general fund about $28 million. Pretty
[12:36]
close to that target. Of that $28
[12:38]
million, some is earmarked for various
[12:41]
things. For example, we have $3.9
[12:44]
million and we call uh it's a a reserve
[12:48]
account the board selects and and funds
[12:52]
$3.9 million. The limit of that is 5% of
[12:56]
your expenditures. We have about 3.9% in
[13:00]
there. This year, if we want to as a
[13:02]
board, we can dedicate additional funds
[13:04]
to get to that max 5% in the operations
[13:07]
fund. Other things in there that are
[13:10]
earmarked are uh funds for we call
[13:13]
retirement liabilities about $4.5
[13:16]
million. There's additional funds for
[13:18]
other other dedicated projects such as
[13:20]
curriculum adoptions. We have dedicated
[13:23]
funds for personal uh development in
[13:25]
there. So we have various dedications,
[13:28]
but we have about $12 million in there
[13:30]
that's not earmarked for future
[13:31]
spending. That is just capital savings
[13:34]
for sorry operational savings for when
[13:36]
we have those needs because we know what
[13:39]
our state funding is going to be every
[13:41]
year. Our local funding kind of es and
[13:44]
flows
[13:46]
depending on the payment rate of taxes
[13:48]
in our county. Our county has about a
[13:50]
94% payment rate that's been coming down
[13:54]
in recent years as high as 96. So that
[13:56]
affects how much local money we have
[13:58]
coming in. Also uh all our flat fees in L those up e and flow with the
[14:04]
economy we have a recession and we have
[14:07]
consumers not buying vehicles and
[14:09]
trailers and all those things that's
[14:10]
going to go down. So we have a fund
[14:13]
balance to take care of those
[14:15]
uncertainty in local tax flows. Also our
[14:18]
federal government at times cuts funding
[14:20]
or redistributes funding or we have
[14:23]
funding decline for different reasons.
[14:25]
For example, in title one, it's based on
[14:28]
poverty rates in our county. Those rates
[14:31]
are declining. The 2020 census, our
[14:34]
poverty rate was 9% in our county. The
[14:37]
most recent census data came out on for
[14:38]
2024 year was 6%. So, we had 3% decline
[14:42]
in poverty rates in our county. That
[14:45]
equated to a $250,000 cut in Title One
[14:48]
funds. So we have these local savings to
[14:52]
account for those uncertainties that
[14:53]
happened throughout the over the years.
[14:57]
Uh questions.
[15:00]
Okay.
[15:02]
Uh questions on fund balance history.
[15:07]
Okay.
[15:10]
Uh let's talk about our proposed
[15:11]
purchases. So we talked about district
[15:13]
vehicles. We're going to replace older
[15:14]
vehicles to reduce maintenance costs. Uh
[15:17]
school buses. Again, we're going to
[15:18]
replace 18 vehicles on a perox schedule.
[15:21]
Um, buses are a long lead item. We have
[15:24]
some buses that we ordered in 2024
[15:27]
that have not been delivered yet.
[15:30]
We're still waiting on them.
[15:33]
So, that's why we have maintained this
[15:34]
budget here to periodically order buses
[15:36]
so we know when they come in, they're
[15:37]
available for use because they're not a common item. They're not like F-150s
[15:41]
that you build millions a year. They're
[15:43]
but not quite custom order, but it takes
[15:44]
a while. is only a few manufacturers,
[15:46]
mostly Bluebird and International make
[15:49]
buses and so there's only two
[15:51]
manufacturers and it's it's a longer
[15:54]
time to get these buses
[15:58]
um secure vestable. So here's the detail
[16:00]
on that. Uh with Corey uh and DWA, our
[16:04]
construction manager, we estimated what
[16:06]
we're going to have to do, what we need
[16:08]
to So we need about uh 100,000 for Bay
[16:11]
River High School. We need about uh
[16:15]
$500,000 for Box Elder High School and
[16:18]
Box Elder Middle School. It's about $2
[16:21]
million because right now the office is
[16:23]
way down the hall. So to move that and
[16:26]
pro and create additional space for
[16:27]
secure vestables in front will take some
[16:29]
funds. Um Corey is here to talk about
[16:34]
this if we have questions on that for
[16:35]
Corey.
[16:44]
Uh not for this state is the state
[16:47]
funding helping because they're
[16:49]
mandating.
[16:49]
>> No.
[16:58]
» And how long are we thinking that will
[17:00]
take? We well this if we approve these
[17:03]
projects that depends on the capacity of
[17:06]
local contractors we would have to go
[17:08]
through especially for the middle school
[17:10]
design process architects be involved
[17:13]
and go through that process. It's a
[17:14]
smaller design process but we still have
[17:15]
to go through that process. The deadline
[17:17]
for having these in place is 2034.
[17:20]
They gave us a long lead time notifying
[17:22]
hey we're not going to help you with
[17:24]
these construction costs. So please plan
[17:26]
on them. And so that's again part of our
[17:29]
capital balance is a plan for these
[17:30]
long-term construction projects.
[17:35]
» We would like to do it sooner than
[17:36]
later.
[17:37]
>> Yes. Yes. Yes. There are some safety
[17:40]
concerns that we like to address so not
[17:42]
everybody can just walk in the building
[17:44]
and not be noticed.
[17:53]
» Yes. Yes. But it is a
[17:57]
>> it is.
[18:00]
And this is uh I'm not sure what year
[18:02]
this building was designed to melt, but
[18:04]
I know it was decades ago that this was
[18:06]
not even a consideration.
[18:08]
My my son goes to Weber High and they
[18:11]
have the same problem. They you walk
[18:13]
into that school, they have a secure
[18:14]
vestible, but the office is way far away
[18:16]
and you walk into a giant courtyard that
[18:18]
spoken hub. So for them to secure it in
[18:21]
a meaningful way would be difficult as
[18:22]
well. So, we're not unique to the
[18:24]
problem that to comply with the law,
[18:26]
it's going to take significant amounts
[18:28]
of money.
[18:32]
Uh, oh, I can go back to this one here.
[18:35]
Sewer maintenance. Those are our
[18:37]
estimates. We don't based on a
[18:40]
historical cost and expenditures, for
[18:42]
example, the fix the lake view problems
[18:44]
about $120,000 this year. We don't know
[18:47]
what we're going to find. These are just
[18:49]
ballparks of what we think we might need
[18:51]
and we'll know better about that um
[18:54]
probably closer to July. Cory,
[18:56]
>> hopefully it's just
[18:59]
>> okay.
[19:01]
Well, that's basically July.
[19:04]
>> Okay. July.
[19:08]
» Questions on the maintenance?
[19:10]
Yes.
[19:11]
>> Just that
[19:14]
>> is that like you in addition to what we
[19:15]
are expend.
[19:17]
>> Yes. So, we fixed the what was broken,
[19:19]
but we didn't fix what could break in
[19:21]
the future.
[19:24]
» Uh, air conditioning of the $5.1
[19:27]
million. Here's our breakdown.
[19:30]
Um, you can see Bear River High School
[19:32]
is the biggest cost. We have the
[19:34]
equipment. Um, I'm not We bought it
[19:37]
during the pandemic, but we didn't have
[19:40]
funds or or I wasn't here. I don't know
[19:43]
why we didn't install, but I know that
[19:44]
funding was an issue back then. And so
[19:47]
that's an estimate there and know we
[19:50]
haven't gotten very far on that one. So
[19:51]
we're estimating about $5.1 million for
[19:53]
all these projects. Caveat is we don't
[19:56]
have to dedicate all these funds in this
[19:57]
year. We have we can have some timeline
[20:00]
to do that, but that would be a priority
[20:02]
the board establishes.
[20:04]
>> This year we already
[20:08]
the current one we're in. We decide we
[20:10]
dedicated 1.5. This is in addition to
[20:11]
that 1.5.
[20:15]
So really that 1.5 will roll over to
[20:17]
this year because we're not going to get
[20:18]
it done this year. So that 1.5 will come
[20:20]
back into the fund balance.
[20:23]
It's not part of this.
[20:24]
>> And when we approve that, we just
[20:26]
decided we take a chunk that line item
[20:29]
when we approve that
[20:32]
one or two.
[20:33]
>> Yep. Yep.
[20:35]
>> The 1.5 was only for the middle school
[20:37]
at the time for this year. These are
[20:40]
additions to those.
[20:44]
Yes, this but this is a need here that
[20:46]
we're going to earmark for those things
[20:47]
and we'll keep on rolling that forward
[20:49]
according to the board priorities of
[20:50]
when which schools to prioritize and
[20:52]
when to do those schools.
[20:57]
Uh playground upgrades $500,000. Here's
[21:00]
a rationale. Replace older playgrounds
[21:02]
that pose a safety hazard. Time to time
[21:05]
students get injured when a playground
[21:06]
fails. Um broken bones sometimes we want
[21:10]
to prevent that. They're very old in
[21:12]
some places. They're not big enough.
[21:13]
They're antic spaces. We know we have an
[21:16]
overcrowding issue in a lot of
[21:18]
elementary schools. And contributing to
[21:20]
that is our playgrounds don't have
[21:22]
enough space for kids to spread out and
[21:23]
it creates behavior and other incidences
[21:25]
where if we expand our playground spaces
[21:28]
and put newer, more modern playgrounds
[21:30]
in there that hopefully will alleviate
[21:31]
some of those issues. But with the new
[21:34]
playgrounds, do we just on wood chips or
[21:38]
are we getting like the
[21:40]
>> pour in place?
[21:41]
>> Does that mean the rubber thingy?
[21:43]
>> Yes.
[21:44]
That is this new standard for
[21:46]
schools.
[21:47]
>> Heidi, do you have something to add to
[21:48]
that?
[21:51]
Did a really great job of summarizing
[21:52]
it.
[22:00]
Okay, we do have 250,000.
[22:02]
>> Is your mic on? I think your mic's off.
[22:06]
I
[22:06]
>> think we have 250,000 in the budget
[22:09]
annually for ADA playgrounds. So, we are
[22:11]
working through that. Really good news
[22:13]
to hear. There's 500,000 for this summer
[22:16]
to get started on projects because there
[22:18]
is a major discrepancy between the
[22:20]
playground spaces that we have available
[22:23]
um the year and the quality and just the
[22:25]
availability of space to play at North
[22:27]
Park and McKinley when you compare it to
[22:29]
Sentry or Discovery or Hton Spike or
[22:31]
Garland. Many of our elementary schools
[22:34]
have a separate play space for our our
[22:37]
younger elementary students and our
[22:38]
upper elementary students. And in
[22:40]
addition to that, some of our
[22:41]
playgrounds also have a kindergarten
[22:43]
preschool playground and an ADA
[22:45]
playground. At both McKinley and North
[22:47]
Park, there's genuinely one little
[22:50]
playground that's smaller than the
[22:52]
center of this space that all 650 kids
[22:55]
get on at one time. And those are really
[22:58]
outdated and old. So that's the initial
[23:00]
intent here is to begin with those two
[23:03]
playgrounds and update and expand
[23:06]
increase so that we have less of those
[23:07]
safety hazards to repair some of the
[23:10]
broken stuff. Um make it so that they
[23:12]
have a space to separate the K2 and 35
[23:15]
students. That's something we've heard
[23:17]
many many concerns about and
[23:20]
frustrations from our school community
[23:22]
councils and parent communities in both
[23:24]
of those areas over the last three to
[23:25]
four years. So, I think that it's
[23:28]
something that they've really been
[23:29]
pushing for and promoting. This next
[23:31]
year, the ADA playground is being
[23:34]
allocated to um Century Elementary
[23:38]
um because they hold ESY there and they
[23:41]
have functional skills. We've been
[23:42]
alternating north and south end. We're
[23:45]
considering the next one going in that
[23:48]
you learn based off of me.
[23:54]
» They'll be started this summer. It
[23:56]
sounds like they won't be able to be
[23:57]
done, right?
[24:02]
» For the ADA of 500 or in addition to
[24:06]
500.
[24:06]
>> Neil's saying in addition,
[24:07]
>> in addition, we wrote a new line item. I
[24:09]
want to say in March or February, I
[24:11]
can't remember which month. We have too
[24:13]
much fun together.
[24:14]
>> When we do 250,000, if we split up
[24:16]
between the two playgrounds and then the
[24:18]
board in place itself is about 60,000,
[24:21]
that would leave like 60,000 worth of
[24:24]
equipment. And that is not very much.
[24:27]
It's like one climb on object without
[24:30]
slides or space. So 250 between the two
[24:34]
schools just would not provide them with
[24:35]
very much. Yeah. I just wanted like the
[24:37]
context for me. I was like, "Oh,
[24:38]
$250,000 state-of-the-art playground."
[24:41]
But it's it's really not. And when you
[24:43]
split it between two schools and the
[24:44]
pour in place is really an upfront
[24:47]
expense for the safety.
[24:49]
I think for context, the Discovery the
[24:52]
new playground at Discovery Elementary
[24:55]
ADA compliant is about $165,000.
[24:59]
They're expensive. They're needed and we
[25:02]
need to make them safe and have adequate
[25:03]
space for all our students because
[25:05]
recess is a really important part of the
[25:06]
elementary experience.
[25:15]
an explanation.
[25:23]
» So the poor in place, we have a member
[25:27]
on his way and I want to let him know
[25:28]
that he can still come. It's clay is on
[25:31]
his way. The poor in place is a risk
[25:34]
issue. It prevents a lot of injuries,
[25:37]
serious injuries from falls. The wood
[25:39]
chips in the winter time they freeze and
[25:42]
they're hard as rock and they fall and
[25:43]
they hurt people. They often maintained
[25:46]
uh on a regular basis. Astro turf or the
[25:49]
turf artificial turf it sometimes gets
[25:52]
wear patterns and wears out fast and has
[25:54]
to be reconditioned. Pour in place
[25:56]
really is the most cost effective at
[25:57]
reducing um uh injuries and being
[26:01]
longlasting.
[26:12]
other questions on playgrounds.
[26:16]
Okay.
[26:20]
Uh Boxeller High School.
[26:24]
Um actually, let's skip this for now cuz
[26:27]
Clay Tus, vice principal of Box High, is
[26:30]
on his way.
[26:31]
>> Sorry, Bear River High. I'm sorry. Uh so
[26:34]
let's skip these right here. Let's go to
[26:36]
the elementary.
[26:39]
All right. So, construction plans
[26:43]
discover expansion 12 classrooms,
[26:46]
eight are general ed classrooms. These
[26:48]
will eliminate the two portables that we
[26:49]
already have there. Um, we have a
[26:52]
preschool and we have special space as
[26:54]
well. Is that accurate, Cory?
[26:59]
» Okay.
[27:03]
» Oh, sorry. Net eight, but net of eight
[27:05]
when we take in the portables.
[27:06]
>> Yes.
[27:07]
>> Okay. So, 10 general classrooms,
[27:09]
preschool classrooms, special ed
[27:11]
classrooms. We're going to take some of
[27:12]
our special ed students from other
[27:14]
locations that are have a high burden
[27:16]
for special ed, move them over to the
[27:19]
Discovery Elementary to spread out that
[27:21]
population and allow students to attend
[27:24]
closer to the neighborhood schools where
[27:25]
possible.
[27:27]
Um, we're going to add additional gym
[27:28]
space because you can't have eat lunch
[27:32]
and have gym at the same time. And so we
[27:34]
don't have enough space for that. And so
[27:36]
we're adding additional gym space for
[27:37]
that purpose. So we can separate our
[27:39]
lunchtime from our PE time at and have
[27:42]
them run at the same time.
[27:44]
Um additional playground area as well.
[27:46]
We're going to have a playground area go
[27:48]
to the north into the field right there.
[27:51]
Not the whole field, but a portion of
[27:52]
Davis Park will become play space for
[27:54]
these students. again with our our um
[27:58]
our aim to increase play spaces, have
[28:00]
adequate spaces for students and
[28:01]
adequate playground uh equipment ADA
[28:04]
compliant for those students that need
[28:06]
that. Um this will add between 180 to
[28:09]
200,000 students. Sorry, not thousand
[28:11]
200 students 180 to 200 students
[28:16]
um total capacity questions on
[28:18]
discovery.
[28:21]
Uh not listed here is we're air
[28:23]
conditioning the building. So, as part
[28:25]
of this project, the old part of the
[28:26]
building will receive air conditioning
[28:27]
as long as well as the new part.
[28:31]
Um, cost is about $15 million total
[28:34]
cost. Yes,
[28:36]
>> I remember being in there with like the
[28:44]
questions about um updating the
[28:48]
>> controls,
[28:50]
>> fire alarm. Yes. Fire, fire and air
[28:53]
conditioner controls. Yes.
[28:56]
>> Yeah.
[28:57]
Uh, one thing we didn't see coming when
[28:59]
we designed this building, um, this
[29:02]
building doesn't have fire sprinklers in
[29:03]
it. It wasn't required in 1994 when it
[29:06]
was built, now required. So, we're going
[29:08]
to have to have fire protection in the
[29:10]
new building and the old building. So,
[29:12]
we're going to have to sprinkle the
[29:12]
whole building. So, that's additional
[29:14]
cost that we weren't con considering
[29:16]
when we started the design process and
[29:17]
RFP process.
[29:20]
So we'll bring the whole thing up to
[29:21]
standards including secure vegetables as
[29:23]
well.
[29:25]
Uh West Traymon I think we're about 30
[29:27]
classrooms. Cory is that
[29:40]
» compare?
[29:42]
So, Golden Spike Elementary is 104,000
[29:46]
square ft
[29:48]
and this Fremont Elementary would be
[29:51]
85,000 square ft. So, it's about 20,000
[29:54]
square ft smaller. Um, we are about 34
[29:59]
classrooms.
[30:01]
Um, it's one story.
[30:04]
We we have done modifications to the
[30:07]
2017 design so that it is more suitable
[30:12]
for
[30:13]
um some of our populations that need
[30:17]
special accommodations
[30:19]
and as I think I mentioned before also
[30:22]
additional office spaces for admin and
[30:25]
counseling.
[30:28]
Garland is approximately
[30:31]
73,000
[30:33]
square feet, I think. So, it's about
[30:35]
10,000 square feet bigger. And back to
[30:38]
Discovery,
[30:40]
that addition is 28,000 square ft. The
[30:44]
current building is 53,000 ft. So, it's
[30:47]
going to put Discovery square footage
[30:49]
somewhere between
[30:52]
the um Garland North
[30:57]
about 85,000.
[30:59]
>> Where's our math teachers?
[31:03]
» Somewhere around 80,000.
[31:21]
the middle core or the middle common
[31:24]
areas that they use for
[31:26]
support staff that is not counted as a
[31:29]
classroom.
[31:30]
>> So in these 34 classrooms there's also
[31:33]
support space uh there's conference room
[31:36]
space there's instructional training
[31:38]
space. So, we're just talking about
[31:40]
actual student instructional spaces in
[31:43]
that 34 number.
[31:45]
>> Um, one of the things too I just want to
[31:47]
point out with Golden Spike versus
[31:48]
Tmont. Golden Spike will have more
[31:51]
seating for students in the cafeteria.
[31:53]
We'll have more gym seating. So, Golden
[31:55]
Spike is 259 students per cafeteria.
[31:58]
Tmont is 281. The dining or the gym is
[32:02]
490 seats at Golden Spike, but at Tmont
[32:05]
it will be 624. And then the medium shel
[32:08]
is bigger because we just realized that doesn't work for the number of
[32:13]
students. So those common areas are
[32:16]
going to be bigger to accommodate the
[32:18]
size of the school.
[32:21]
And if you've been in Golden Spike
[32:23]
Elementary
[32:25]
and you've been in the Garland Fielding
[32:28]
through Mount Creek Design,
[32:31]
this West Tmont Elementary really is a
[32:34]
blend of those two as far as the
[32:37]
classroom wings are, how they function,
[32:39]
and where the gym cafeteria
[32:43]
is kind of connected. It's kind of a
[32:46]
blend of those two designs.
[32:50]
Other questions on West Trmont on the
[32:53]
building design timeline, anything like
[32:55]
that?
[32:58]
Okay,
[33:04]
let's talk about the the construction
[33:06]
loan here. So, we have three uh banks
[33:10]
that are helping us out here and we have
[33:12]
three because we need separation of
[33:13]
duties.
[33:15]
So, Zans is our municipal adviser. Uh we
[33:18]
have a contract with them for them to
[33:19]
advise us on these types of scenarios,
[33:22]
borrowings, uh loans, financing. uh they
[33:26]
provide the financing detail every year
[33:29]
for our loans. They're actually the
[33:32]
trustee on our loan for Golden Spike and
[33:35]
also our uh general obligation loan as
[33:38]
well because they are advisor. They
[33:41]
can't be that's new in the past two
[33:43]
years. We signed a contract with them.
[33:45]
So when they loaned us funds for Golden
[33:48]
Spike, they are not our adviser. So they
[33:50]
cannot issue us a loan because that'll
[33:52]
be a conflict of interest as an adviser.
[33:54]
So they're advising us on this. Bank of
[33:58]
America is our underwriter. In an
[34:00]
advisory capacity, Zans um put out a
[34:03]
solicitation
[34:05]
to various underwriters, other banks for
[34:09]
this project. Um there were three that
[34:11]
responded. Um
[34:15]
Bank of America gave us the best terms
[34:18]
between the underwriting, the bond
[34:19]
council fees, and we call the spread. So
[34:23]
spread is the distance between the a the
[34:26]
average market rates called MMD,
[34:29]
municipal market data and that is
[34:32]
calculated every day on every loan out
[34:34]
on government debt. Uh mostly state and
[34:38]
local government debt.
[34:40]
And so their number of basis points they
[34:43]
wanted to cover the cost of this loan.
[34:45]
Underwriting legal fees was the lowest
[34:49]
amongst the three people who responded,
[34:50]
three banks who responded to this loan.
[34:52]
So they are the winner on basis of a
[34:54]
cost. The Zans Bank also analyzed uh
[34:59]
past performance experience with um
[35:02]
school financing uh deals in the past
[35:05]
and determined that Bank of America in
[35:07]
addition to the cost was the most
[35:09]
experienced and provide us the best
[35:11]
experience for securing this loan.
[35:14]
uh US Bank will be our trustee
[35:17]
because uh Zans can't be the trustee and
[35:20]
when you borrow usually have a third
[35:21]
party that's not the same party doing
[35:23]
the lending as the trustee to receive
[35:24]
the funds and distribute the funds. So
[35:27]
they'll be our trustee on this deal
[35:33]
uh the underwriting and the trustee
[35:34]
part.
[35:37]
>> Okay. So the underwriter
[35:41]
» separation of duties, separation of
[35:44]
conflict of interest.
[35:47]
» Okay. So Z is our adviser.
[35:50]
>> So they're like our I I'll compare us to
[35:53]
a mortgage loan. They're our loan our
[35:55]
mortgage officer. Now, when you go get a
[35:57]
mortgage, you generally they have,
[36:00]
unless you buy from a in-house bank like
[36:03]
Wells Fargo, Right Mortgages, but you go
[36:06]
to an independent mortgage officer, they
[36:07]
get mortgages from various different um
[36:11]
banks. And so, Bank of America is our
[36:14]
mortgage officer. They're going to look
[36:16]
at our financials. They're going to look
[36:17]
at our credit rating. They're going to
[36:19]
assess our creditworthiness. They're
[36:21]
going to say, "Based on this, here's
[36:22]
your risk and here's what we can get you
[36:24]
in the market." So they're going to
[36:25]
guarantee us a certain amount of yield
[36:29]
or proceeds from this loan.
[36:32]
If and so that's that's where they're
[36:35]
coming from. US Bank is a trustee. So
[36:38]
back to mortgages,
[36:40]
generally the person the bank that you
[36:42]
borrow your mortgage from is not who you
[36:44]
pay your mortgage to. The third party
[36:46]
serer. So US Bank is the third party
[36:49]
serer. They'll collect the funds and
[36:51]
distribute the funds and ensure
[36:53]
compliance with the loan requirements
[36:55]
and also with any federal or state
[36:57]
reporting requirements as well.
[36:59]
Currently, Zans acts as the trustee for
[37:02]
our golden spike loan and also for our
[37:05]
general obligation bond loan.
[37:09]
>> Which one?
[37:11]
>> Bank of America.
[37:15]
» And we chose them based on experience
[37:17]
and on total cost.
[37:23]
Yes, Stephanie.
[37:29]
» Um, I just curious the 4.44%
[37:33]
interest,
[37:34]
>> correct?
[37:34]
>> That's that's the rate we're getting for
[37:36]
this loan.
[37:38]
>> Well, this is quoted on April 1 or about
[37:40]
April 1st.
[37:41]
>> The quoted amount. How how does that
[37:43]
compare to the loan that we could have
[37:46]
had had it not been
[37:49]
Great question.
[37:50]
>> It's probably about the same because the
[37:53]
middle of February is when that process
[37:55]
stopped. We still had a series of
[37:58]
meetings to hold legally before we could
[38:00]
have went out for the loan. We would
[38:02]
have been seeking the same that dollar
[38:04]
amount at this same time right now.
[38:06]
Probably probably in the month of May is
[38:08]
when we would have sold bonds and we
[38:09]
probably would have been at the same
[38:10]
cost. So it it's not the interest rate
[38:13]
that we would have had this time would
[38:15]
not have any different because the time
[38:17]
we started that process in December, we
[38:20]
had zero idea there's going to be a war
[38:21]
in the Middle East. And that's what's
[38:23]
driving interest rates up right now is
[38:26]
the war in the Middle East.
[38:33]
» So we have these three banks. Yes.
[38:37]
Involved banks. uh this right here this
[38:41]
interest cost is total interest cost
[38:43]
incurred. So what they they do in
[38:46]
accounting terms they amateurize or
[38:48]
spread off the the cost of issuing the
[38:50]
this loan legal fees uh underwriting
[38:53]
fees credit check fees
[38:56]
across the whole loan term and so the
[38:58]
fees are included in here. All three
[39:01]
banks are included.
[39:04]
>> Correct.
[39:08]
» All three are included in the 4.4
[39:10]
interest and in the 4.4 million annual
[39:13]
payment.
[39:13]
>> Correct.
[39:16]
>> Is there a way to break them out so we
[39:19]
know?
[39:19]
>> Yes. I didn't display that here, but the
[39:21]
total the cost of issuing this loan are
[39:24]
about uh $170,000.
[39:28]
legal costs, underwriting costs, credit
[39:30]
check costs, cost of going to of of
[39:33]
doing all the research. That's what
[39:35]
those costs are. And those are spread
[39:37]
across the life of the loan. We call
[39:38]
them amortized costs. So, we issue a
[39:41]
certain amount to each period of the
[39:43]
loan in each year. So, they get their
[39:46]
money up front, but we pay it back
[39:48]
overtime.
[39:49]
And that's the that's the requirement of
[39:51]
the underwriter. The underwriter pays
[39:53]
all those fees up front for us, and they
[39:54]
get their money overtime back. Other
[39:59]
questions on this process?
[40:03]
>> So, how does this differ from what we
[40:06]
were looking at?
[40:10]
» Uh, it's not a bond and bond rates have
[40:14]
better slightly better interest rates.
[40:15]
It used to be between a general
[40:17]
obligation bond and this type of loan,
[40:20]
there would have been a half percentage
[40:22]
point difference or 50 basis points.
[40:25]
that is narrowed to 25 to 30. So the the incentive to seek a general
[40:31]
obligation bond and all that process
[40:32]
goes with it is kind of out the window
[40:35]
because a lot more compliance costs and
[40:37]
timeline to get this type get a general
[40:39]
obligation loan. where this right here
[40:42]
can be done much quicker and the
[40:44]
additional cost for the risk the banks
[40:45]
incur is much less because a general
[40:49]
obligation is a guaranteed amount
[40:51]
secured by property taxes earmarked only
[40:54]
to repayment of that loan through the
[40:56]
collection of property taxes
[40:58]
underwriters and banks see that as the
[41:00]
most secure form of government debt
[41:03]
because earmark for that and can only be
[41:05]
used for that purpose. This is being
[41:08]
funded by general property tax receipts.
[41:11]
There's not a specific area earmark for
[41:13]
that. So they view that as more risky.
[41:16]
Essentially, if we wanted to, we could
[41:18]
not pay this back and keep our money.
[41:21]
And so that's why they have a higher
[41:23]
interest rate to account for that risk.
[41:26]
It's kind of like getting a home equity
[41:27]
loan versus a first mortgage. Your first
[41:31]
mortgage is always first repayment and
[41:33]
has a lower interest rate than a home
[41:34]
equity loan.
[41:39]
So the general obligation fund is that
[41:41]
the same as the lease revenue fund? No.
[41:44]
So how is this different from the least
[41:46]
revenue fund?
[41:48]
>> Uh this is a direct lending product to
[41:50]
us. Uh doesn't go through the lease
[41:51]
revenue process. It doesn't have the
[41:54]
same resolutions. It's not a separate
[41:56]
legal entity. In this case, the building
[41:58]
authority for lease revenue bond that
[42:00]
takes it out. So this is a a direct loan
[42:02]
product.
[42:03]
So really the difference in the is in
[42:06]
the legal details of how it's secured
[42:08]
and what is allowed
[42:18]
as far as how it affects us. There's not
[42:21]
much difference. I mean there might be a
[42:24]
talking basis points. So each basis
[42:25]
point is 01%.
[42:28]
So there might be five to seven basis
[42:30]
points difference between this and a
[42:32]
lease revenue bond. Again, a lease
[42:34]
revenue bond doesn't have a dedicated
[42:35]
funding stream because it's not
[42:37]
generally not voted and approved by the
[42:39]
taxpayers for a separate myab on your
[42:40]
taxes. It's funded out of existing tax
[42:43]
receipts.
[42:46]
» So with this route, who actually owns
[42:49]
the buildings? It will there will be we
[42:53]
essentially it will be like a lease
[42:54]
revenue where there's a entitlement to
[42:58]
the underwriter Bank of America that we
[43:02]
lease back from them till the loans paid
[43:04]
off. It's the same thing with Golden
[43:05]
Spike. Golden Spike is a is a ground
[43:07]
lease from Zans and that the we make
[43:11]
lease payments to Zans. They hold title
[43:13]
to it. No different than when you buy a
[43:16]
car dealership with a loan. the
[43:18]
dealership has a lean on that title. You
[43:20]
can't sell that that car until your lean
[43:23]
or your loan is satisfied. So, this is
[43:26]
no different that we already operate.
[43:29]
>> How many buildings the past 10 years
[43:33]
have built using this finance option?
[43:36]
>> Um,
[43:38]
Golden Spike and
[43:42]
>> Fielding are the two ones that I'm that
[43:44]
I know right now that we have
[43:46]
outstanding. Those are two outstanding
[43:48]
debt right now. So, general obligation
[43:50]
bond, which is we used to expand high
[43:52]
schools back in 2008, is one of our
[43:54]
loans, and that was a 30-year loan. Um,
[43:56]
Fielding was also, I think, a 20-year
[43:58]
loan. We're going to pay that off this
[43:59]
year. Last payment is this year. And
[44:01]
then Golden Spike as well.
[44:04]
>> Like, elementary, Sunrise High School,
[44:08]
>> those were all fun with existing build
[44:09]
uh capital reserves.
[44:11]
>> The difference between that is the cost
[44:13]
of building was much less than it is
[44:15]
today. Other
[44:19]
questions?
[44:23]
» Um, I guess my question is this.
[44:27]
When we
[44:29]
um received a petition um of 8,000
[44:32]
people asking us not to go out and do
[44:36]
this kind of a loan.
[44:38]
To me it looks like that this is
[44:42]
the same kind of kind of a finance
[44:44]
vehicle kind of like a horse of a
[44:47]
different color. So what are we
[44:49]
interpreting that the people ask us with
[44:52]
that petition?
[44:55]
>> I would say from my perspective as the
[44:58]
business administrator and financial
[45:00]
adviser of the board if you will the
[45:02]
difference here is the amount and the
[45:05]
projects.
[45:06]
Um leader I would say the district
[45:09]
leadership feels that these elementary
[45:11]
projects are a must need now given the
[45:14]
growth we've seen from our demographer
[45:16]
that's forecasted given the building uh
[45:19]
developments we know are coming and
[45:21]
given the overcrowding we have in our
[45:23]
current buildings right now don't feel
[45:25]
like we are at a luxury of waiting an
[45:29]
additional 18 months or more to secure
[45:31]
financing by putting on the ballot begin
[45:33]
construction we feel this is a need that
[45:35]
we must address now, not in 18 months.
[45:40]
So that's I say that's the rationale for
[45:41]
proposing this and going forward with
[45:44]
this.
[45:45]
>> I see that the rationale and and I'm not
[45:47]
saying I disagree. I'm asking
[45:49]
specifically the financing vehicle part
[45:52]
of it.
[45:55]
Oh, it looks like we're we're going out
[45:59]
to get financing, which I think the
[46:01]
petition was asking us not to encumber
[46:04]
the residents with that kind of a
[46:06]
long-term debt.
[46:08]
We're going out with another horse of a
[46:11]
different color to encumber the
[46:13]
residents. Again, we're not encumbering
[46:16]
the residents for any additional funds
[46:19]
that aren't already secured by local
[46:20]
property taxes. This is within our local
[46:22]
property tax budget. I understand that
[46:24]
there's a public uh opposition to our
[46:27]
financing. I feel that we have that what
[46:30]
we were seeking before actually not have
[46:32]
almost a third 55 million versus 140
[46:35]
million and red restricted it to
[46:37]
elementary projects only which has been
[46:39]
a concern of the residents that has
[46:43]
expressed to us through the different
[46:45]
surveys we did and community feedback.
[46:48]
So yes, it's a different financing
[46:50]
different different color, but it's it's
[46:52]
done to address the needs we have right
[46:55]
now.
[46:57]
So, would it be possible to um again go
[47:02]
back to the residents and ask them in a
[47:09]
voted question, I guess, if they would
[47:12]
support these projects and do it with a
[47:16]
general obligation bond, which puts the
[47:19]
power back in the residents rather than
[47:22]
us going forward with these. I'm not
[47:24]
saying that the projects aren't needed.
[47:26]
My question is only the funding
[47:28]
mechanism.
[47:29]
Um I I just feel like that although we
[47:34]
feel that they're needed, um
[47:38]
we are I think legally required to
[47:42]
represent the residents and I think
[47:46]
they've told us in a couple of different
[47:48]
ways that they don't want this kind of
[47:50]
obligation. So I'm just wondering if we
[47:52]
might be
[47:54]
stepping over a line that we are
[47:56]
supposed to represent them first.
[47:59]
>> So I will answer it in a few different
[48:00]
ways. First of all,
[48:02]
>> the first question is could we go to a
[48:06]
voted question on these projects and
[48:08]
this amount and a and a geo bond
[48:13]
government bond is possible by the vote
[48:15]
of the board in by August to approve a
[48:19]
ballot question for the financing of
[48:21]
these projects. That is an option the
[48:23]
board has. By doing so, the soonest that
[48:26]
we would have the go-ahad from the
[48:29]
voters would be in November. And then
[48:32]
we' go through that process again if
[48:34]
it's through a lease revenue process to
[48:39]
start the resolutions again. We have our
[48:41]
we really have like close to 90 days of
[48:43]
legal requirements to be able to start
[48:46]
that lease revenue bond process again.
[48:48]
So that puts us into February before we
[48:51]
can even go out for the loan and go
[48:53]
through the underwriting process. We
[48:55]
probably wouldn't have funds until this
[48:57]
time next year going through that
[48:59]
process.
[49:02]
» General obligation bond will be an
[49:04]
additional not
[49:08]
>> Yeah, that's what I wanted to say was
[49:09]
you said general obligation bond. So, in
[49:12]
order to pay for that, it would have to
[49:14]
be an additional tax
[49:17]
um a lease revenue bond, which was um
[49:22]
which failed or you know, they had the
[49:23]
signature stop that. And so, anyway,
[49:28]
>> yeah, I'm sorry. I should have said in
[49:29]
that formula that we could roll back the
[49:32]
taxes, roll back the taxes.
[49:36]
You know, we've heard you a couple of
[49:37]
different times that this isn't what you
[49:40]
wanted. We feel like that this is what
[49:43]
we've heard that you do want because you
[49:45]
mentioned the surveys as
[49:48]
this something that you would support
[49:50]
financially. This is what we think that
[49:52]
we heard you different but this is would
[49:56]
you support a geo bond financial
[49:58]
mechanism? So in addition to what I just
[50:02]
go ahead
[50:06]
» I think everybody understands that yes
[50:09]
that could happen that that question of
[50:12]
course it could it would just it would
[50:13]
take the board to vote to do that right.
[50:17]
So if it was a clarifying I mean we all
[50:19]
know that of course that is an option
[50:22]
but it would take the board to vote to
[50:23]
do that.
[50:26]
>> I might just go I I might add a couple
[50:28]
things. So when we start talking about
[50:31]
and I agree if we want to do a a survey
[50:34]
about that question certainly if the
[50:36]
board wants to do that uh I think one
[50:39]
thing that we need to note is that you
[50:43]
know there's a lot of things from the uh
[50:46]
2024 bond that changed. Uh there's a lot
[50:50]
of things that based on that feedback we
[50:54]
changed for the lease revenue bond
[50:57]
option and what we're hearing and I hope
[50:59]
that as you saw the presentation we're
[51:02]
investing in Lake View North Park
[51:07]
Middle.
[51:09]
We have to extend the life of these
[51:11]
buildings. You can also see the grades 6
[51:14]
through 8 92 is off the table. Now
[51:19]
whether it ever goes back on the table,
[51:20]
I do believe that that would be a vote
[51:22]
of the people through a survey to say,
[51:25]
is that something you want to pursue?
[51:28]
But the immediate need uh as we're all
[51:32]
hearing and as you look at the
[51:34]
elementary
[51:36]
uh portables that keep coming
[51:39]
um there is a need there and all other
[51:43]
things have been put to the to the
[51:47]
wayside for now and whenever that
[51:50]
happens whenever there's an appetite I
[51:52]
think we look at that but having a
[51:56]
secure vestable at our three largest
[51:58]
schools is a priority. Uh having AC in
[52:02]
Bear River Middle a priority. Some may
[52:04]
say, well, why are you putting AC in a
[52:05]
building? Well, because right now
[52:08]
there's not a mechanism
[52:10]
to secure a loan. But to Karen's point,
[52:14]
if there needed to be a situation where
[52:16]
we said, you know, we're going to roll
[52:19]
back and we're going to go for a
[52:21]
geobond, are you okay with, you know,
[52:25]
these two projects that influence
[52:28]
roughly a population of 600 students and
[52:33]
800 students? Um, so not a significant
[52:36]
amount of our students are going to be
[52:38]
affected by these two projects. if we go
[52:42]
out to a general obligation bond. So,
[52:44]
that would be interesting to see if the
[52:47]
people would vote for that if it didn't
[52:49]
affect Bear River Middle, Boxiller
[52:52]
Middle, Lake View, uh, North Park. So,
[52:55]
those are just some thoughts, but I hope
[52:57]
that if anybody's watching or listening
[53:00]
that you hear that the plans that we've
[53:02]
had have changed.
[53:05]
It's very significant that they have
[53:07]
changed. They're not the same. we've
[53:09]
pulled back and I think that means we
[53:11]
have listened. We have listened and if
[53:15]
the people don't want us to go forward
[53:18]
uh with any of these projects, I guess
[53:21]
that's something we'll have to deal with
[53:24]
as well. So, that could be the question
[53:26]
uh that you might ask. So, anyway, that
[53:29]
was just a a thought. Um, but I hope
[53:32]
that we do know that we're not going to
[53:34]
put the initiative on the ballot for a
[53:37]
lease revenue bond in November based on
[53:40]
the signatures that were gathered.
[53:43]
That's not going to happen. At least I I
[53:45]
got zero sense from the board that that
[53:47]
would be something where we're headed.
[53:48]
So, those are just some insights and
[53:51]
thoughts, but I would love to hear the
[53:53]
rest. Um, I guess my thoughts on this
[53:56]
are
[53:59]
I'm hearing from my constituents now I
[54:02]
know that we all represent different
[54:03]
people that they are actually in support
[54:06]
of the school district building these
[54:08]
buildings and moving forward and
[54:10]
understand the financing is necessary
[54:13]
and realize that we do not have
[54:17]
a year to 18 months to put this off. And
[54:19]
I think that um
[54:22]
I think the longer we hold off, the more
[54:24]
it's going to cost us and the greater
[54:26]
the needs are going to be. And just with
[54:29]
this lake view situation, it's become
[54:30]
really more apparent to me because when
[54:34]
you have a school with the sewer and the
[54:36]
restrooms and it was an inconvenience
[54:38]
for most students and they could
[54:40]
survive, but there were some that was
[54:42]
actually uh inhibited their learning in
[54:46]
a very significant way. And if we say we
[54:49]
are here to educate all students and we
[54:51]
do not provide facilities that are
[54:53]
appropriate for those students to be
[54:54]
educated in, then we are not doing our
[54:56]
jobs. And if that's going to cost us
[54:58]
some money and I think we're with this
[55:01]
plan, we've shown we're putting sewer.
[55:04]
We we realize we don't have the money to
[55:06]
build all the buildings that we need.
[55:08]
It's just a fact. But if we can use the
[55:10]
buildings that we have and make them
[55:12]
more usable for longer and prevent some
[55:14]
of those issues, then we are serving the
[55:16]
needs of all of our students and not
[55:18]
just
[55:20]
and even if it's only 2% of the students
[55:23]
that we're not serving because of these
[55:25]
needs, that's 2% of our students. And
[55:28]
there are and I would argue it's far
[55:30]
more than that because of the we don't
[55:32]
know the situations or the circumstances
[55:34]
that every child is coming from. And so
[55:37]
we have to have safe schools as we're
[55:39]
those secure best schools. We need to
[55:42]
have functional schools and if we have
[55:44]
to put in money and if and air
[55:46]
conditioning has been a a big push and
[55:50]
people that I've talked to are like my
[55:51]
kids their elementary like we why don't
[55:53]
we have uh air conditioning in Lake View
[55:56]
and you know because in the past we're
[55:57]
like well we're going to replace Lake
[55:58]
View. Do we want to put that much money
[55:59]
into it? Well we're at the point where
[56:01]
yeah we're going to have to keep using
[56:02]
Lake View. So, we've got to put money
[56:03]
into those things. But the from what I'm
[56:06]
seeing from cities and the growth that
[56:09]
we're experiencing or potentially
[56:11]
experiencing, we have got to be prepared
[56:13]
and do everything we can to make our
[56:15]
buildings last longer and then do what
[56:18]
we can now and not put it off
[56:21]
until later. And so, I know that they
[56:23]
gathered signatures. I know there are
[56:24]
people that are very adamantly opposed
[56:27]
to our plans. the from the people that
[56:29]
I've talked to, they are actually
[56:32]
supportive of moving forward and they
[56:34]
want us to do something. They want us to
[56:36]
invest in our schools and our
[56:37]
infrastructure.
[56:50]
» Again, I'm not opposed to projects. I'm
[56:53]
just wondering with I think the way that
[56:56]
the that we're legally supposed to move
[56:58]
forward is based off of the we're
[57:01]
supposed to represent the repres the
[57:04]
residents. So I'm just wondering have we
[57:06]
looked at other funding mechanisms? Have
[57:08]
we looked at any grants or other options
[57:12]
for getting money?
[57:14]
>> Um
[57:15]
>> there are no grants available to build
[57:17]
schools,
[57:21]
» you know. Um,
[57:24]
Julie was saying that the people she's
[57:27]
listening to want it and I some of the
[57:29]
people I've heard want the elementary
[57:31]
schools. That's why I think that they
[57:33]
would actually pass a bond. Um, but I
[57:38]
think that we've got to go back and and Keith mentioned, you know, we've
[57:43]
heard that from the the bond that didn't
[57:45]
pass the people didn't want that. We've
[57:47]
heard from the signatures they didn't
[57:49]
want that. What mechanism do the people
[57:52]
have to tell us they don't want this?
[57:54]
How do we how do we know that we're
[57:56]
doing what we're supposed to legally do
[58:00]
and that's represent residents because I
[58:03]
don't know that they have a mechanism to
[58:04]
come back and tell us don't want this.
[58:07]
>> I want to say one thing here. What we're
[58:10]
doing is legal. We've run it through our
[58:12]
bond council at Chapman and Cutler.
[58:14]
They've done the research. We are
[58:16]
allowed to do this. School districts
[58:18]
have needs they have to address on a
[58:19]
regular basis. I'll give you an example.
[58:22]
Earthquake in 2020 in Magna damaged a
[58:25]
school in Grant School District they
[58:27]
were unable to inhabit. They would not
[58:29]
have been able to fix that school for
[58:31]
the following school year if they were
[58:33]
not allowed to get a loan right then and
[58:35]
there. That was an immediate need they
[58:37]
had. They could not have the luxury of
[58:40]
going out to the voters in a bond
[58:43]
election to ask for the permission to
[58:46]
get a loan. They had to address it then
[58:48]
because they had a a school that would
[58:49]
not be functional for a significant
[58:51]
amount of time if they did not.
[58:54]
>> Yes. I just would add
[58:58]
I just I in the tree mountain end I just
[59:01]
see
[59:03]
how crowded they are and we also serve
[59:06]
these kids to make sure that they have a
[59:08]
good place to learn which I I mean we
[59:13]
talk about the portables how they're
[59:15]
nice because they have the air
[59:16]
conditioning but we're also running down
[59:18]
our buildings that we have currently
[59:20]
because they're being over
[59:23]
overused a good I don't know. But the
[59:25]
restrooms and just putting that added
[59:28]
pressure onto those buildings that
[59:32]
I just I see
[59:35]
that putting it out to
[59:38]
um the uh ballot would be really uh
[59:43]
what's the word like they supportive. Um
[59:47]
somebody like said that they want that
[59:50]
validating. can't be very validating for
[59:52]
the community to be able to say yes to,
[59:54]
but in the back of my mind, well, what
[59:57]
happens if they say no? And then what
[1:00:01]
about all these kids that are also now
[1:00:03]
moving in? And and as we continue to
[1:00:05]
grow, like I just feel like we're doing
[1:00:06]
such a disservice
[1:00:08]
to the students that are there that this
[1:00:10]
is impacting a lot. Um, you know, the
[1:00:12]
new school comes in, Garland students
[1:00:15]
that are going to fielding can now come
[1:00:17]
back to Garland. Kids that are getting
[1:00:19]
bus from Thatcher can now go to the
[1:00:21]
closer school and now Garland kids can
[1:00:23]
go to Garland and McKinley can fit in
[1:00:25]
their school. It just doesn't seem like
[1:00:27]
this is a a a want. It really does seem
[1:00:32]
like a need and I just think we have an
[1:00:36]
obligation to these students to um make
[1:00:40]
decisions that are in our purview to
[1:00:44]
make sure that that happens. I don't
[1:00:46]
know.
[1:00:48]
>> That's I guess how I feel. I would add
[1:00:50]
that we did a democratic study. The
[1:00:52]
study came back and said over the next 5
[1:00:54]
years over 5,000 households are planned
[1:00:58]
in new construction
[1:01:00]
for our county. So if we were to go to
[1:01:04]
the voters and wait till next year start
[1:01:05]
this process, this new school probably
[1:01:08]
would be functional, have students in it
[1:01:11]
for 3 years. We're in the middle of a
[1:01:13]
thick and grow cycle in 3 years. I feel
[1:01:17]
like that if we wait that time, we're
[1:01:20]
going to have 15 more portables in the
[1:01:23]
north end than we have right now.
[1:01:26]
One consideration in our calculus to put
[1:01:29]
this plan forward.
[1:01:34]
» Um, if I remember right, the uh
[1:01:38]
the survey that came back from the
[1:01:43]
what's the paper again? demographer
[1:01:46]
>> demographer I think we are up 190
[1:01:49]
students in five years which if you
[1:01:52]
spread that out it's like one student
[1:01:54]
per classroom so we do have growth but I
[1:01:57]
don't know that it's overwhelming growth
[1:01:59]
per the demographer not the per the
[1:02:01]
demographer so the other thing I'm um
[1:02:05]
again stressing is that I I don't know
[1:02:09]
that anybody would say that these
[1:02:11]
projects don't need to be done just
[1:02:13]
saying that the financing mechanism
[1:02:16]
looks a lot like we're just trying to go
[1:02:19]
around, but they us not to. I don't know
[1:02:22]
if that's crossing any lines that maybe
[1:02:25]
we wanted to consider. Um, I've had a
[1:02:28]
lot of phone calls since the newspaper
[1:02:31]
article came out a couple weeks ago. I
[1:02:33]
don't take the newspaper, but I've had a
[1:02:35]
lot of phone calls saying that in an
[1:02:37]
interview with Keith um that he
[1:02:40]
acknowledged that we need to build
[1:02:42]
trust. Like again, I haven't read the
[1:02:44]
article, just what people have been
[1:02:46]
telling me. So, if we want to do that,
[1:02:50]
I'm just wondering, is this the best way
[1:02:52]
to do that or is it it might be better
[1:02:55]
in the long run to build trust for
[1:02:58]
future projects to go back and get their
[1:03:01]
um input and help them to feel like that
[1:03:04]
they're a vested part of this.
[1:03:07]
>> I would say that's um a board discussion
[1:03:10]
item. Us as leadership are putting forth
[1:03:12]
a plan that we think addresses our needs
[1:03:14]
educationally. we feel this is the best
[1:03:16]
way to address them in the near term.
[1:03:20]
>> So speaking to that Karen because I
[1:03:21]
thought about that a lot. I thought are
[1:03:22]
we going against the will of the voters?
[1:03:24]
Is this number one it's not illegal. I
[1:03:26]
don't think we are doing anything that's
[1:03:28]
out of line out of step in any way shape
[1:03:30]
or form. I think what we have is an
[1:03:32]
obligation to to our students and to our
[1:03:35]
residents and to go forward in the best
[1:03:37]
way we can. So I don't think it's a
[1:03:39]
legal matter at all. But secondly,
[1:03:43]
one of the things that I consider as a
[1:03:45]
board member is I am a representative of
[1:03:48]
the people, but that doesn't mean I
[1:03:51]
listen to the loudest or that I I have
[1:03:54]
to, you know, like there they did gather
[1:03:56]
signatures, but that was still not the
[1:03:59]
full percentage of the county. We know
[1:04:00]
the bond failed at a significant rate.
[1:04:02]
Yes. So, we went and reworked it. But as
[1:04:04]
a representative,
[1:04:06]
I feel like they're putting trust in us
[1:04:08]
to look at the data, look at the
[1:04:10]
solutions, look at what we need to do,
[1:04:12]
and make the best decision possible. I
[1:04:14]
see Tom's here, Tom Peterson. He's my
[1:04:16]
representative in the state legislature,
[1:04:19]
and I don't necessarily
[1:04:21]
know all the decisions that they make
[1:04:23]
and what they're doing, but I know he's
[1:04:25]
representing a large group of people and
[1:04:27]
he has to, but I also trust that he's
[1:04:30]
doing his homework. like when he goes to
[1:04:32]
vote on something, he's looked at it and
[1:04:33]
said, "Is this what is best for the
[1:04:35]
majority of the people for the purpose
[1:04:37]
that it is?" And I think that's our role
[1:04:39]
as board members. I don't think our role
[1:04:40]
is to go out and take a poll every time
[1:04:42]
somebody we're going to do something and
[1:04:44]
say, "Are you okay with spending this
[1:04:45]
money this way? Are you okay with us
[1:04:47]
spending money that way?" I think ours
[1:04:49]
we take the feedback and they say, "Yes,
[1:04:50]
we support these projects and we say,
[1:04:52]
okay, this is how we have ability to do
[1:04:55]
that." And then we move forward in that
[1:04:56]
way. And so one of the things that I
[1:04:59]
think that when we talk to the public
[1:05:00]
about this, I think we need to be really
[1:05:02]
clear that it's not that we're not
[1:05:04]
listening to you, it's that we are
[1:05:06]
trying to do what you want us to because
[1:05:08]
I've heard people say we want the
[1:05:09]
elementarymentaries, we want those
[1:05:11]
things, but hold off until we approve it
[1:05:13]
in a certain way. And I just think
[1:05:15]
that's actually costing us more money
[1:05:17]
and actually
[1:05:20]
depleting trust with the rest of the
[1:05:22]
community that the people that, like I
[1:05:24]
said, the people that I've talked to,
[1:05:25]
they're just like, "My kids are
[1:05:26]
suffering. How come my
[1:05:29]
for example like Golden Spike new school
[1:05:31]
and they had something there and they
[1:05:33]
had like different dance team like I
[1:05:34]
think it was literacy night and they had
[1:05:37]
different dance companies or different
[1:05:39]
performance groups come and perform and
[1:05:41]
her kids go to Lake View and they went
[1:05:43]
and performed there. just like
[1:05:46]
how is that fair that my kids have to go
[1:05:48]
to this school without even enough
[1:05:50]
bathrooms and then other kids have to go
[1:05:52]
here and at the same thing how come my
[1:05:54]
kids are all crowded into this space
[1:05:56]
where this school has plenty of of space
[1:05:58]
and room available and we're trying and
[1:06:01]
I think we have to consider the whole we
[1:06:03]
need the space we're trying to make
[1:06:06]
things right for us and obviously we
[1:06:09]
have older buildings and we can't just
[1:06:10]
build everything new but I think the
[1:06:12]
public is asking us to do what is best
[1:06:15]
with the money that we have in the way
[1:06:17]
the best we can. And this is our this is
[1:06:19]
our option. We don't have a huge
[1:06:21]
business coming in. In fact, any
[1:06:22]
business that does come in, we don't get
[1:06:24]
the taxes for a long time. You know, we
[1:06:27]
don't have we have a different
[1:06:28]
demographic. We know that. But we are a
[1:06:31]
community and we are trying to do what's
[1:06:33]
right as a community to benefit
[1:06:37]
our students and our community in the
[1:06:40]
best way we know how. And so when I look
[1:06:42]
at it this way, I don't think we're
[1:06:44]
going behind anybody's backs. We're
[1:06:45]
being very open and saying we need this
[1:06:48]
done. This is the option we have and we
[1:06:50]
need to move forward because any weight
[1:06:52]
is actually costing us more. And I was
[1:06:56]
sending I don't know if they pass it
[1:06:58]
with just that particular thing on the
[1:06:59]
bond because it's only affecting small
[1:07:01]
groups of people and and maybe the Lake
[1:07:04]
View parents are like, well, I'm getting
[1:07:06]
nothing out of this. like they could be
[1:07:08]
upset and and so I don't know I said too
[1:07:13]
much but that's what I'm thinking.
[1:07:15]
>> I guess that's where my my biggest
[1:07:17]
question lately has been is like if
[1:07:19]
we're going to take everything to the
[1:07:20]
ballot then what am I doing here? Like
[1:07:22]
why am I sitting why am I doing all this
[1:07:24]
homework to figure out if this is a good
[1:07:25]
idea if we should just put it on the
[1:07:28]
ballot? I I guess that's just been my I
[1:07:32]
don't understand.
[1:07:37]
So just the political culture, the
[1:07:41]
climate that we've been in for the past
[1:07:44]
years, I just think over and over again
[1:07:47]
that we live in a representative
[1:07:50]
republic, not
[1:07:53]
people vote for representatives, not
[1:07:56]
only
[1:07:57]
we don't go by popular opinion. We don't run by
[1:08:02]
we don't sway and make decisions based
[1:08:05]
on popularity in the moment. We we study
[1:08:08]
things out and we we are elected to
[1:08:10]
choose to do what is best. I think we
[1:08:13]
say we've said this a lot but this board
[1:08:15]
has said we want to get the biggest bang
[1:08:17]
for the buck. We're trying to spread out
[1:08:20]
the funds that we have that we receive
[1:08:24]
in the best way possible to affect the
[1:08:26]
most students possible. and teachers and
[1:08:32]
that just keeps coming back to me. Um to
[1:08:34]
run a poll and to run
[1:08:38]
a questionnaire whatever every single
[1:08:40]
for all these decisions
[1:08:43]
isn't what our
[1:08:46]
that's not how our government runs. I
[1:08:49]
have just I have not had someone talk to
[1:08:52]
me and say I want you to give my taxes
[1:08:54]
back. I have had a lot of people say to
[1:08:57]
me, "What are you going to do with it?
[1:09:00]
You've got it. What are you going to do
[1:09:01]
with it?" And some of those names were
[1:09:04]
on the petition. I'm just And I've also
[1:09:08]
had people say, "I signed that petition
[1:09:10]
because they told me you were raising my
[1:09:12]
taxes again." So, the petition bears
[1:09:15]
weight with me. It's important. I
[1:09:17]
listen. I'm listening. I but there were
[1:09:21]
people on that that signed that petition
[1:09:23]
for all different reasons. Not just
[1:09:25]
saying I think I would dare say that
[1:09:28]
it's the vast minority that signed that
[1:09:30]
petition to say we don't like the
[1:09:32]
funding mechanism you're using. I know
[1:09:34]
some did. I know some did. But people
[1:09:37]
signed that petition for all different
[1:09:39]
reasons. For spite a huge amount for
[1:09:43]
spite because they were angry about
[1:09:44]
their taxes. that what I'm hearing now,
[1:09:47]
even from that email that I forwarded to I think all of you from the the Tree
[1:09:52]
Mountain groups that represent four
[1:09:54]
quarters of Tree Mountain, they don't
[1:09:56]
want to know if they're getting their
[1:09:57]
taxes back. They want to know, are you
[1:09:59]
looking for growth? What are you doing
[1:10:01]
with our money now that you've got it?
[1:10:02]
What is your plan? And so, personally,
[1:10:06]
I'm not willing, and this isn't a vote.
[1:10:08]
We're not taking a vote tonight. This is
[1:10:10]
a discussion. I'm not willing to say
[1:10:12]
let's give the taxes back because it
[1:10:15]
wastes time. It wastes money and we have
[1:10:17]
we're rethinking and we're reusing and I
[1:10:20]
think we're trying to use this money
[1:10:23]
to get the biggest bang for our buck for
[1:10:24]
the most people. So
[1:10:28]
that's
[1:10:32]
um I'm not suggesting that we take a
[1:10:34]
poll on everything. Um, I think that 95%
[1:10:38]
probably 98% of our decisions we make
[1:10:41]
and we do the best we can to represent
[1:10:43]
the people. Um, I'm just saying that
[1:10:46]
we've had this
[1:10:49]
kind of a question with the bond with
[1:10:52]
the petition on this question. I think
[1:10:55]
that it might be worth going back to the
[1:10:58]
people on that. I'm not saying that the
[1:11:00]
projects aren't good projects. I'm just
[1:11:02]
saying that I think that the people have
[1:11:04]
kind of said, "Okay, on this one we want
[1:11:06]
to be able to have some input." That's all I'm saying. Um I know that um
[1:11:14]
we've heard that some people are getting
[1:11:16]
phone calls saying that they support
[1:11:18]
this and like I said, I've had some that
[1:11:20]
say, "I would definitely support
[1:11:21]
elementary schools and you know, the
[1:11:23]
security issues." So that's why I'm a
[1:11:26]
believer that if we rolled back the
[1:11:29]
taxes, give the public the opportunity
[1:11:32]
to be invested in it, I think we have a
[1:11:35]
very good public, I think that they
[1:11:37]
would see that these are needs and I
[1:11:39]
think that they would actually vote for
[1:11:40]
that geo bond, which um I think would be
[1:11:43]
the right way to do it. But just a side
[1:11:46]
note, I have also had a member of my
[1:11:50]
community come and tell me that their
[1:11:53]
neighbor is now selling her blood twice
[1:11:55]
a month, be able to pay for increased
[1:11:58]
taxes. So, I don't know what everybody
[1:12:01]
out there's doing, but I know that this
[1:12:03]
is hurting some people. And so, I'm just
[1:12:05]
wondering if there's a better way.
[1:12:13]
» Thank you. Thank you for that.
[1:12:18]
Danielle, did you have anything you want
[1:12:19]
to add to any of this?
[1:12:22]
All right. Is there any other
[1:12:24]
discussion? Directors, do you have
[1:12:26]
anything for us?
[1:12:29]
Wisdom, director, superintendent, you'd
[1:12:32]
like to share?
[1:12:34]
>> Oh, yeah.
[1:12:36]
>> No, I I think we've had this
[1:12:38]
>> this discussion.
[1:12:39]
>> Yeah, we've had it several times and I
[1:12:41]
appreciate it. It's so important for us
[1:12:43]
to really understand try to understand
[1:12:47]
I appreciate this time. Does anyone feel
[1:12:49]
like we need to keep
[1:12:52]
>> here? Yeah, I'll hand
[1:12:56]
» um I just wanted to say after I don't
[1:12:59]
remember which meeting it was, but we
[1:13:00]
did have a lot of the members that were
[1:13:02]
really pushing the petition um and
[1:13:05]
really advocating to get that signed. A
[1:13:08]
member from the community up north that
[1:13:10]
lives kind of by me. I don't know this
[1:13:11]
individual very well, but after one of
[1:13:13]
the board meetings where they came to
[1:13:15]
listen about what we were doing, um this
[1:13:18]
individual, she stopped and stayed at
[1:13:20]
the end when the board went into close
[1:13:22]
session and she spoke very strongly and
[1:13:25]
adamantly about the fact that as she was
[1:13:28]
gathering those votes, she felt like the
[1:13:30]
people really wanted to see West
[1:13:32]
Traymont and built that that that area
[1:13:34]
really strongly feels that it needs
[1:13:36]
done. And I I just wanted to speak
[1:13:38]
because to that because as you said, I
[1:13:41]
do think that a lot of people signed the
[1:13:43]
petition for a lot of different reasons
[1:13:45]
and we can't really speak to what that
[1:13:47]
reason was, but I just thought it was
[1:13:49]
worth noting that that individual who
[1:13:51]
was listening to a lot of people and
[1:13:53]
really pushing that petition felt like
[1:13:55]
we really do need to move forward with
[1:13:57]
Traymont. And I I've gone back and forth
[1:14:00]
on this a lot. And I just don't know how
[1:14:03]
to meet the needs of the students in
[1:14:05]
elementary school without doing
[1:14:07]
something. It's it's not fair what we're
[1:14:10]
doing in our title one schools to those
[1:14:12]
kids. And it is our three title one
[1:14:14]
schools that are seeing the most amount
[1:14:15]
of impact. They're the ones with less
[1:14:18]
playground space. They're the schools
[1:14:20]
with less flexible space in their
[1:14:23]
classrooms. We we don't have those same
[1:14:26]
problems at ThreeMile Creek. And it it's a big difference for those kids in
[1:14:32]
our most impacted schools that that see
[1:14:34]
the hardest things day in day out. And
[1:14:38]
this has been a problem that we've had
[1:14:40]
for four years since I've been in my
[1:14:43]
position. A big fear about the building
[1:14:45]
and construction that's going in in
[1:14:47]
Tmont and how that's going to impact the
[1:14:49]
schools. and we've been limping along
[1:14:51]
for a really long time doing all that we
[1:14:54]
can to make do and do without and
[1:14:56]
support the kids. And I I do genuinely
[1:14:59]
believe that the majority of the
[1:15:02]
community does understand that something
[1:15:04]
has to be done for elementary schools.
[1:15:06]
And that's just what I wanted to add as
[1:15:08]
the elementary assistant superintendent
[1:15:10]
since that's what we're discussing.
[1:15:14]
Ultimately all this information as we
[1:15:16]
think about the different that are shown
[1:15:18]
to us tonight ultimately so as we have
[1:15:22]
action items
[1:15:24]
to approve contract
[1:15:28]
I know the help me here the construction
[1:15:33]
what is the name of that construction
[1:15:35]
management
[1:15:37]
the action item on Wednesday right
[1:15:39]
that's that's a vote so we just if you
[1:15:43]
at that meeting decide no this is not
[1:15:45]
the way I want to move forward then
[1:15:48]
that's when you go right um and then we
[1:15:52]
reate things
[1:15:53]
>> can we propose a brief restroom break
[1:15:56]
for a few minutes here before our next
[1:15:57]
topic
[1:16:01]
» 8:30
[1:16:03]
reconvene that's that's good
[1:16:19]
Oh no.
[1:23:34]
I didn't get to ask what you thought
[1:23:36]
about.
[1:23:39]
» I should have asked
[1:23:42]
>> the facilities.
[1:23:52]
» Oh, before we go to facil
[1:23:53]
>> Clay, would you join us up here?
[1:23:57]
>> We're next to Cory. He doesn't bite.
[1:24:00]
>> And Mr. Gilmore, I think you were up
[1:24:01]
here, too.
[1:24:06]
» Now, I just I want to clarify the
[1:24:08]
facilities
[1:24:11]
committee was shown this two months ago.
[1:24:15]
>> About that. Yeah,
[1:24:16]
>> about two months ago. Part of it. I
[1:24:17]
don't even think all of it. And and this
[1:24:20]
is just a way to There's a problem.
[1:24:24]
>> Yes,
[1:24:24]
>> there's a big problem.
[1:24:30]
» Um, so we need a solution. This is one
[1:24:33]
solution, correct?
[1:24:34]
>> That's correct. It's a proposal from the
[1:24:37]
facilities leadership of how we can fix
[1:24:39]
some problems we see.
[1:24:40]
>> All right. And this solution wasn't
[1:24:42]
built by the facilities board members
[1:24:44]
committee, right?
[1:24:45]
>> Correct.
[1:24:46]
>> But but we were shown it months ago.
[1:24:49]
>> Yeah.
[1:24:55]
» And I'll lean on Corey here to correct
[1:24:59]
me on size if they're wrong. Is this the
[1:25:00]
right size of Boxelder High?
[1:25:02]
>> 51. I'm close.
[1:25:05]
>> All right. This is the size of Boxelder
[1:25:07]
High. As we can see by the text here,
[1:25:10]
it's actually 51 acres.
[1:25:13]
Look how spread out it is. We have the
[1:25:16]
Let's see if this doesn't work here.
[1:25:20]
Um, here we go. We have the NAT right
[1:25:23]
here. We have the baseball and softball
[1:25:26]
up here. Then we have the uh football
[1:25:29]
field. We have the CT area, the main
[1:25:32]
part of the building. Then we have
[1:25:34]
parking back here, additional practice
[1:25:36]
fields, uh down here at tennis courts.
[1:25:39]
We're pretty well spread out.
[1:25:42]
Now, when we get to Bear River,
[1:25:45]
we're at 29 acres. Is that accurate,
[1:25:47]
Cory?
[1:25:49]
And
[1:25:51]
see if this is going to work here. We
[1:25:53]
have softball next to baseball. We don't
[1:25:56]
have a lot of parking. And those sports
[1:25:58]
happen in the same season. Here we have
[1:26:01]
the track and lacrosse actually lacrosse
[1:26:04]
happens in the springtime. All four of
[1:26:06]
those sports happen the same time and
[1:26:07]
sometimes we have home events for all
[1:26:09]
four sports. There's not a lot of
[1:26:11]
parking and space back here.
[1:26:13]
We have a practice field up here that
[1:26:15]
also doubles as a parking lot during
[1:26:17]
spring for our different athletic
[1:26:19]
events. Um seminary building we don't
[1:26:22]
quite own yet, but we don't have parking
[1:26:24]
up there. And then I go across the
[1:26:27]
street. We have parking over here. And
[1:26:29]
then we have the NAT over here and more
[1:26:31]
parking. But what happens is, and we
[1:26:34]
can't really see this on my picture
[1:26:35]
here, I apologize. Along these roads up
[1:26:38]
here on 14 north, students park on both
[1:26:41]
sides of the roads because we have
[1:26:43]
adequate parking. Down here in between
[1:26:47]
the Bear Center and the CTE building and
[1:26:49]
the main building, we have buses running
[1:26:51]
back here to pick up students. We have
[1:26:53]
buses running in front here to pick up
[1:26:56]
students. And over here we have student
[1:26:59]
parking over here that students cross
[1:27:01]
right here and create a massive traffic
[1:27:03]
jam on Main Street. Same thing up here.
[1:27:06]
They cross over here. We have a parking
[1:27:09]
problem. We have a space problem.
[1:27:12]
>> Going to be built.
[1:27:14]
>> Okay. Um I'll get to that.
[1:27:15]
>> Okay. It's not anywhere there.
[1:27:17]
>> Uh it it is it is. But I I think my
[1:27:19]
visual better illustrates it. Well, our
[1:27:22]
parking problem creates a student safety
[1:27:23]
problem. Now to the north here, we own
[1:27:26]
land across the street, but it's not
[1:27:28]
really safe to have kids crossing that
[1:27:30]
main road on a regular basis for
[1:27:32]
parking. Um, it also requires
[1:27:35]
significant
[1:27:36]
um amount of construction to get it
[1:27:38]
there.
[1:27:41]
So, here's our bus loading zones behind.
[1:27:44]
We load uh some special ed students, but
[1:27:47]
we also load in front as well. And this
[1:27:49]
is morning and afternoon that happens.
[1:27:52]
There's about 35 buses that come to this
[1:27:54]
area on a daily basis each morning, each
[1:27:56]
afternoon. It's a lot of bus traffic and
[1:27:58]
a lot of student traffic mixed with
[1:28:00]
buses. A lot of traffic on Main Street
[1:28:02]
that gets backed up for students
[1:28:03]
crossing back and forth and buses. We
[1:28:07]
really think that we need to alleviate
[1:28:08]
this in some form or fashion.
[1:28:14]
So, we went through a design phase as
[1:28:16]
part of the RFP authorized about this
[1:28:18]
time last year to redesign this campus
[1:28:21]
to the intent was to allow 9th graders
[1:28:24]
to come up with the high school. So,
[1:28:26]
this is what the redesign looked like.
[1:28:29]
Let's see if I can get this to work
[1:28:30]
better here. So, proposal is to purchase
[1:28:34]
a seminary building, which we are going
[1:28:36]
to be doing, and we would extend have
[1:28:38]
extended this building up through here.
[1:28:40]
Now, that we're no longer building this.
[1:28:42]
For the time being, this would area
[1:28:43]
right here, the semary building become a
[1:28:45]
parking lot next year in August of 27.
[1:28:48]
Probably be available for us to
[1:28:49]
construct a parking lot.
[1:28:51]
Here's a new seminary building right
[1:28:52]
here, right across the street. We traded
[1:28:54]
land size for land size for them to have
[1:28:57]
this building over here.
[1:29:00]
And so we need to create a parking
[1:29:03]
entrance right here for parking to come
[1:29:05]
in the back side of the auditorium
[1:29:07]
because Main Street is a UD do road. UD
[1:29:10]
do will not authorize another curb cut
[1:29:12]
to allow traffic in from this side over
[1:29:13]
here. So, we're going to have to come in
[1:29:15]
down through here to put parking in
[1:29:18]
here.
[1:29:20]
And then here's a potential moving of
[1:29:23]
the base of the softball field because
[1:29:27]
we want to create the practice field,
[1:29:29]
make that a so a parking lot for
[1:29:31]
students and for buses. buses would come
[1:29:34]
in around the perimeter of the field of
[1:29:36]
the of the parking lot, but line up for
[1:29:39]
um students to board them. That removes
[1:29:41]
them from behind here
[1:29:45]
and in front of the school where we have
[1:29:47]
lots of traffic already. And in the
[1:29:49]
center would be student parking during
[1:29:51]
school time and event parking for
[1:29:53]
different events we have at the high
[1:29:55]
school. Doing that, we need a practice
[1:29:58]
space. So the softball field will become
[1:30:02]
a practice field and then the softball
[1:30:04]
field move over here. In doing so, that
[1:30:07]
alleviates spring sports congestion back
[1:30:10]
here and people trying to get out on
[1:30:12]
Main Street from behind the school. It
[1:30:14]
would be moved over here. They could
[1:30:16]
park in an auditorium parking right here
[1:30:17]
and exit out that way. They could park
[1:30:20]
over here and exit this way or down Main
[1:30:22]
Street easier and wouldn't create so
[1:30:24]
much traffic behind the school during
[1:30:26]
events.
[1:30:30]
So this is what it looks like.
[1:30:32]
Add parking remove and it also removes
[1:30:34]
all the student parking from the roads.
[1:30:36]
We wouldn't allow any student parking on
[1:30:38]
the roads anymore. Creates a safety
[1:30:40]
issue. The speed limit on that road up
[1:30:42]
there 14 or north is pretty quick and we
[1:30:45]
we'd hate to see an accident like that
[1:30:47]
involving a vehicle. Either students
[1:30:49]
backing out because they pull in or
[1:30:51]
students trying to cross the road or get
[1:30:52]
in their vehicle. It's just a a risk
[1:30:54]
that we think we need to address um
[1:30:57]
sooner than later.
[1:31:00]
So, natory parking lot changes. Samurray
[1:31:03]
is going to start construction this
[1:31:04]
summer, probably August or September. Um
[1:31:07]
and then we need to access drive the go
[1:31:09]
here to the back parking lot and extend
[1:31:12]
potential expanded parking lot on the
[1:31:13]
new softball field if we choose to do
[1:31:15]
that. But we do need to create this
[1:31:17]
parking access drive uh this summer to
[1:31:21]
bring in there. It can be it can be a
[1:31:22]
temporary drive not be permanent but
[1:31:24]
this is part of this plan to be allowed
[1:31:27]
to gain access back off of 1400 north
[1:31:29]
into the natoran parking
[1:31:33]
>> yes
[1:31:33]
>> this was the slide for that
[1:31:37]
>> yes
[1:31:42]
» north of the
[1:31:45]
» any other questions so far
[1:31:49]
>> what what are they right
[1:31:54]
What are they using that area right
[1:31:56]
there?
[1:31:59]
» Right now that's a practice field or
[1:32:02]
>> middle school.
[1:32:04]
So
[1:32:13]
» they have adequate PE space north of the
[1:32:16]
building and even north of this there's
[1:32:18]
still a fairly good chunk
[1:32:20]
>> right that grass area is not used for
[1:32:22]
medical middle school anything right now
[1:32:25]
right
[1:32:26]
>> rarely it's not needed for PE space
[1:32:34]
uh practice field changes. So the
[1:32:36]
current softball field will become the
[1:32:38]
practice field next to tennis courts. Um
[1:32:42]
eventually we would if we use the
[1:32:45]
current design we've invested in for
[1:32:46]
this high school. We would take down the
[1:32:48]
CTE building
[1:32:51]
uh right here and build a new space here
[1:32:54]
and this will all become parking. And I
[1:32:56]
forgot to mention we also have tennis
[1:32:58]
back here. So tennis is another spring
[1:32:59]
sport. So we have five spring sports
[1:33:02]
potentially that are occurring on this
[1:33:04]
29 acres that most high schools have
[1:33:06]
double the space.
[1:33:09]
>> Neil about that CT
[1:33:13]
>> that CT is that CT building and changes
[1:33:17]
down the road
[1:33:18]
>> down the way. Yes. Yeah. We're using
[1:33:21]
existing design that we worked on for
[1:33:24]
the expansion as a basis of how we can
[1:33:26]
improve access and parking at the build
[1:33:29]
at this campus.
[1:33:34]
Uh those are those slides. Um this is a
[1:33:37]
brief overview. If you go back to the
[1:33:39]
remember the initial slides um we're
[1:33:42]
proposing
[1:33:44]
let me see I think it's four or
[1:33:48]
um
[1:33:54]
yeah I I don't want to misspeak uh $4
[1:33:56]
million for improvements.
[1:34:00]
>> Yes,
[1:34:02]
that's just estimate from architects
[1:34:04]
what it may cost. We don't have any
[1:34:06]
bids. This isn't even designed yet. This
[1:34:07]
is a rough stage one design of this
[1:34:10]
campus. We haven't gone through
[1:34:11]
engineering on this campus yet. And so
[1:34:13]
the engineering and design work uh civil
[1:34:17]
work has not been completed yet. We
[1:34:19]
haven't even gone down that route yet.
[1:34:20]
We haven't invested in that. But this is
[1:34:22]
where we're at so far with the uh high
[1:34:24]
school plans.
[1:34:27]
>> Yes, Stephanie.
[1:34:29]
>> Are you
[1:34:33]
» Yeah, this is No, this is your time now.
[1:34:34]
I'm done with the presentation about the
[1:34:36]
but we can go back to the pictures.
[1:34:38]
>> I I don't know if this is a you question
[1:34:40]
or you question but we just approved
[1:34:42]
doing the turf for
[1:34:45]
the
[1:34:45]
>> baseball We'll also be doing it we'll
[1:34:48]
be doing it for the softball as well. So
[1:34:51]
this is a really good time to make that
[1:34:52]
decision so that we're not undoing what
[1:34:55]
we just do. So making that plan
[1:34:59]
and so that would does does the money
[1:35:01]
that we approved is that part of the 4
[1:35:03]
million or is that
[1:35:04]
>> no money? So that we approved a
[1:35:07]
receiving a donation for the purposes of
[1:35:11]
re of renovating the baseball field. We
[1:35:14]
haven't approved that project yet.
[1:35:18]
» Yes.
[1:35:21]
>> The match funds are not included in
[1:35:23]
this. No, it actually if we include the
[1:35:26]
match funds that would be a $3.5
[1:35:28]
million, but that match is not part of
[1:35:30]
the budget that we're doing right now.
[1:35:36]
» As we've looked through these options
[1:35:39]
and I've talked with Neil, we want to be
[1:35:42]
clear that
[1:35:44]
the issues we are trying to solve are
[1:35:48]
traffic, parking, and busing.
[1:35:51]
And in the process of this and doing the shuffling of things around to make a
[1:35:58]
better setup, there are some benefits
[1:36:01]
that extracurricular activities will
[1:36:04]
gain, but they are not the reason that
[1:36:06]
this is happening.
[1:36:10]
It is a crazy cramped
[1:36:14]
campus that they are doing all they can
[1:36:19]
to make it work. and it's just a
[1:36:22]
struggle all the time. I don't know if
[1:36:24]
you want to say anything else on that.
[1:36:27]
>> Yeah, I mean I agree. We're we're we're
[1:36:29]
basically doing everything we can do. Um
[1:36:32]
we probably have 35% of our students
[1:36:35]
right now that don't park in any parking
[1:36:38]
lot. They park on streets. They park
[1:36:39]
across from where the practice football
[1:36:41]
field is on both sides all the way down
[1:36:43]
the block all the way to the almost
[1:36:45]
railroad tracks. We have people that
[1:36:47]
park there. We have people that park um
[1:36:50]
between the niatorum and the parking lot
[1:36:52]
on the street all the way that way and
[1:36:54]
then on the north side all the way down
[1:36:56]
on that that piece every day come in the
[1:36:58]
winter time when there's a few uh snow
[1:37:01]
piles makes it even worse. Um the bus
[1:37:04]
thing behind the school is a huge issue.
[1:37:07]
We have we have I think we have eight
[1:37:10]
buses that go behind the school um
[1:37:12]
including our our um sped buses that
[1:37:14]
have um the kids that that have to have
[1:37:17]
like wheelchairs and things. that's
[1:37:18]
where they drop kids off. Um, we have no
[1:37:22]
choice but we have kids that have to
[1:37:24]
walk past in between those buses all the
[1:37:26]
time. There's they have to because of
[1:37:28]
where their school their classes are.
[1:37:30]
So, like Corey said, the real the real
[1:37:35]
problem is the parking and the access to
[1:37:37]
the school. In order to fix that, you're
[1:37:39]
going to have to do some other things to
[1:37:42]
make sure that there's other that those
[1:37:44]
get moved to a certain place. It's a lot
[1:37:45]
like what happened with the baseball and
[1:37:47]
softball field at Bosel. In order to be
[1:37:49]
able to build those buildings there, you
[1:37:51]
had to relocate and in order to do that
[1:37:53]
sometimes you have to So yeah, I don't
[1:37:56]
know if there's any questions on on the
[1:37:58]
parking or just the congestion. Neil's
[1:38:00]
not wrong. Um we actually have six
[1:38:02]
sports that would would be there. You
[1:38:04]
got baseball, softball, track, both
[1:38:07]
lacrosse, tennis, and then we have boys
[1:38:09]
uh uh soccer. We have generally
[1:38:12]
baseball, softball, you know, a game on
[1:38:15]
the turf, tennis, a game in the gym all
[1:38:18]
in the same night. And and we have I
[1:38:20]
mean, we we've had a couple of instances
[1:38:23]
where, you know, we have some older
[1:38:24]
people that like to come to games. They
[1:38:26]
have they literally have to walk from
[1:38:28]
all the way over here by the by the
[1:38:30]
junior high school all the way to the
[1:38:31]
back of the building because they have
[1:38:32]
nowhere else to walk.
[1:38:34]
>> Yeah. And I would say if you're um
[1:38:38]
wheelchair bound or have difficulty with
[1:38:40]
mobility, trying to get to the back of
[1:38:42]
the softball field, the bleachers down
[1:38:44]
that gravel or cobblestone you call it
[1:38:46]
path is difficult.
[1:38:49]
>> I was just going to say I was at we've
[1:38:51]
only been in one game this year was a
[1:38:54]
softball game and I watched a woman in a
[1:38:56]
motorized wheelchair try to get from
[1:38:59]
where the stadium seats are behind the
[1:39:01]
softball field around to go to the
[1:39:03]
restroom.
[1:39:05]
I was really It was uncomfortable. It's
[1:39:08]
hard.
[1:39:09]
>> Yeah.
[1:39:12]
I just wonder
[1:39:17]
for people to park
[1:39:20]
» in the in the black areas but not
[1:39:22]
actually but yes in the parking area
[1:39:26]
highlight
[1:39:32]
» just go to the tennis courts
[1:39:34]
>> tennis courts
[1:39:35]
>> yeah so yes there areapost
[1:39:52]
Maybe grandparents would say
[1:39:57]
that's where I'm at.
[1:40:02]
» Do we have any questions about this
[1:40:04]
proposal idea?
[1:40:08]
uh this will be from existing capital
[1:40:10]
funds. So if and I don't mean to make
[1:40:13]
anybody sick here, but if we go back
[1:40:14]
here to the proposed budget,
[1:40:18]
it's within our existing capital funds
[1:40:20]
that we'd be using this for. We would
[1:40:22]
not be raising any additional funds to
[1:40:24]
make this happen.
[1:40:27]
Is that one of the line items or is that
[1:40:29]
>> Yeah, down here river improvements $4
[1:40:33]
million
[1:40:35]
>> and the vote is that is right.
[1:40:39]
>> So yeah, the process will be uh process
[1:40:42]
that superintendent works with me to
[1:40:44]
develop a budget. He tells me what the
[1:40:46]
priorities are. We put the numbers
[1:40:48]
together in the budget book to publish
[1:40:50]
for the public to consume and all wells
[1:40:52]
the board and then in June we will have
[1:40:56]
a vote on what is going to be the
[1:40:58]
proposed budget.
[1:41:01]
So I the plan is to include that in the
[1:41:04]
budget for for the board to consider in
[1:41:06]
June.
[1:41:08]
>> Yes.
[1:41:11]
Uh
[1:41:13]
then we essentially have permission from
[1:41:14]
the board to start the construction
[1:41:16]
planning process to go through
[1:41:18]
engineering design and go get bids. I
[1:41:20]
wouldn't anticipate that happening being
[1:41:23]
starting construction before the fall,
[1:41:25]
possibly next spring on many parts of
[1:41:28]
this. There's some parts we can do.
[1:41:29]
Parking lot's easy to do, but uh the
[1:41:32]
field moves and the other parts of it
[1:41:34]
would take more time.
[1:41:37]
So, an immediate need would be access to
[1:41:42]
the Niatoran parking lot because right
[1:41:44]
now we have one access. It's on the
[1:41:47]
north and it's right where the new
[1:41:50]
seminary building would be built. So,
[1:41:53]
before next school year starts, there's
[1:41:56]
a non-negotiable that we have to have
[1:41:58]
access into that parking lot. Even if
[1:42:01]
it's just a roadbased road, those can be
[1:42:05]
difficult to push snow off of. And that
[1:42:09]
field between the Natorium and Bear
[1:42:12]
River Middle School is currently flood
[1:42:15]
irrigated.
[1:42:17]
So, there are some considerations that
[1:42:18]
we do need to deal with before students
[1:42:21]
are back in school next fall or
[1:42:23]
immediately because as soon as the
[1:42:25]
seminary as soon as the LDS church takes
[1:42:28]
over that area, we lose our access. So,
[1:42:32]
we're going to have to do that in
[1:42:34]
conjunction with them fencing off that
[1:42:36]
section.
[1:42:37]
>> I would add that's probably the least
[1:42:38]
costly part of this project. It's the
[1:42:41]
easiest to uh to do.
[1:42:46]
That's also going to take over 100
[1:42:48]
parking spaces
[1:42:54]
building.
[1:42:54]
>> Yeah, that where they're putting the
[1:42:56]
seminary building that we have a ton of
[1:42:58]
parking right there that will take
[1:42:59]
almost all of that um because of the way
[1:43:02]
that they access that and the way that
[1:43:03]
they'll park on it. So, so again, we're
[1:43:06]
going from not very much to even less.
[1:43:10]
How many current per parking spaces do
[1:43:13]
we have right now versus how many will
[1:43:15]
we have if this is put through?
[1:43:18]
>> Are we talking about the seminary
[1:43:20]
portion or the whole project?
[1:43:23]
>> Um I don't have an estimate on that, but
[1:43:25]
that parking lot is a pretty large
[1:43:27]
parking lot. Let me see if I can read
[1:43:28]
that what it says. Uh 225 by 49.
[1:43:34]
So that's a large 200. It's a nearly a
[1:43:37]
football field long.
[1:43:39]
>> It's actually a little bit bigger. I
[1:43:40]
mean, as far as the whole thing, um
[1:43:43]
right now there's about 240 spaces in
[1:43:46]
the parking lot south of the natiatorum.
[1:43:48]
Um that goes all the way over towards
[1:43:50]
the um the middle school, that little L
[1:43:53]
space right there. Um we have about
[1:43:57]
180 spaces on the north side of the
[1:44:00]
natitorium. Um which that will take
[1:44:04]
roughly a 100 spots. Um, so then you're
[1:44:07]
looking at it, but I think it'll
[1:44:08]
actually take a little bit more than
[1:44:09]
that because of how you're going to put
[1:44:11]
the the access points in. I think
[1:44:13]
that'll actually take more parking await
[1:44:15]
as well. I'm pretty sure you're going to
[1:44:18]
get at least that much and most likely
[1:44:20]
more over here on the practice football
[1:44:23]
field. It's a bigger space than either
[1:44:24]
one of those two are. So,
[1:44:28]
>> yeah, you will lose Yeah. Yeah. Because
[1:44:29]
you will have the bus lanes that go
[1:44:31]
around.
[1:44:35]
Yes.
[1:44:37]
>> But also next to the tennis courts and
[1:44:40]
Oh, we get those.
[1:44:42]
>> Not yet.
[1:44:45]
>> It's just where like your
[1:44:48]
>> So we're looking at here some here. When
[1:44:52]
the seminary comes down, the seminary
[1:44:53]
will we will raise that and we will make
[1:44:56]
it a parking lot. So that's
[1:44:59]
>> Yes. 12 months out. Well, we haven't
[1:45:01]
decided students or staff, but we will
[1:45:03]
have parking.
[1:45:07]
» My preference is in designing this is
[1:45:09]
that staff park behind the school only
[1:45:12]
and students park up here at the top
[1:45:16]
and across the road and over here.
[1:45:20]
>> So, if I remember right, you said that
[1:45:22]
this plan would have all parking
[1:45:25]
students and staff in a parking lot, not
[1:45:27]
on the street.
[1:45:28]
>> That's correct.
[1:45:32]
goal. I mean, it all depends on how many
[1:45:34]
kids drive to school, but that that
[1:45:37]
would that would go a long way.
[1:45:39]
>> Well, we we feel like current drivers
[1:45:42]
would all fit in this current system
[1:45:44]
right now.
[1:45:46]
>> Current drivers would fit in.
[1:45:48]
>> Yes. I mean, if we have three 400 more
[1:45:51]
students in the future, that's another
[1:45:53]
conversation.
[1:45:56]
Well, if you listen to the Tree Mountain
[1:45:59]
City Planner minutes, they're looking
[1:46:00]
for big developments on Radio Hill. So,
[1:46:02]
I think it's more closer to reality than
[1:46:04]
we wanted to believe.
[1:46:08]
Any other questions on this or anything
[1:46:10]
we've talked about tonight?
[1:46:15]
» I think I'd turn it back over to board
[1:46:16]
president.
[1:46:21]
» All right. I think we have reached the
[1:46:23]
end of our agenda. Anyone else?
[1:46:34]
» Thanks everybody.
[1:46:35]
>> Reminder 6 o'clock next Wednesday at
[1:46:37]
Young Intermediate for the uh reception
[1:46:40]
for the retirees and then starts
[1:46:44]
>> young intermediate
[1:46:48]
» the reception.
[1:46:49]
Is that what we call that? The reception
[1:46:51]
open house.
[1:46:56]
That's what it says. Is it?