Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
[0:01]
You're watching BCTV. We're all about
[0:05]
Branford.
[0:11]
You're watching BCTV, Branford Government Television, a
[0:15]
service of Branford Community Television.
[0:18]
This program is brought to you in part through the support of the Town of
[0:22]
Branford.
[0:26]
I'm going to call this meeting to order.
[0:27]
Selectmen meeting, July 1st, 2026, at
[0:31]
4:30 PM, at the Community Center on 46 Church Street.
[0:36]
Item number one, to consider, and if appropriate, approve the
[0:40]
Board of Selectmen minutes
[0:42]
from June 17th, 2026.
[0:45]
I'll move it.
[0:46]
Second. All those in favor?
[0:48]
Aye.
[0:48]
Aye. Item number two is executive session for tax
[0:52]
appeals, and item number three is to consider if appropriate,
[0:56]
approve proposed settlements of pending tax appeals.
[0:59]
We have none, so we're going to
[1:01]
just move past those
[1:05]
items.
[1:06]
Item number four, to consider and act upon the
[1:10]
recommendation of the tax collector and tax assessor
[1:14]
to approve a refund of motor vehicle late fees paid pursuant to
[1:17]
Connecticut General Statute
[1:20]
12-129, based on an administrative
[1:24]
address record error affecting
[1:27]
issuance of a tax bill.
[1:29]
Motion to approve.
[1:30]
I second.
[1:32]
All those in favor?
[1:33]
Aye.
[1:33]
Aye. Motion carries. To consider, and if appropriate,
[1:37]
approve a request from Jennifer Aquino, assistant town
[1:41]
engineer, to waive the bid for permanent pavement patches
[1:45]
on call service pavement
[1:49]
parches,
[1:50]
the name of the company, I assume, Pavement Parches, on-call services,
[1:54]
and award the contract to William M.
[1:57]
Leyden Construction at the following prices:
[2:00]
asphalt patch per square foot at $7.46,
[2:05]
asphalt curb at
[2:07]
$13.47, asphalt
[2:10]
sidewalks
[2:12]
at $6.44,
[2:15]
and asphalt aprons at $6.44.
[2:19]
All of those are square foot prices.
[2:25]
Good afternoon.
[2:27]
Hello, Jen.
[2:27]
Jennifer Aquino, assistant town engineer, before you today for a
[2:31]
request for a bid waiver.
[2:35]
I'm sure you're aware William Leyden Construction has been our on-call paving
[2:38]
contractor since I've been in this role.
[2:42]
The last bid we did was a fiscal year '20 bid.
[2:45]
They were the low bidder for that.
[2:47]
For four years following that, as allowed by contract, they extended their
[2:51]
bid with no cost increase.
[2:54]
In fiscal '25 and fiscal '26,
[2:58]
they extended their bid with a requested 3%
[3:01]
escalation, which was awarded by the Board of Selectmen during those two fiscal
[3:05]
years. The company has once again requested to extend their
[3:09]
contract, and have asked for a 3% escalation,
[3:13]
which results in the pricing that First Selectman Brooks just went over.
[3:18]
When reviewing their request, we take a look at a lot of factors, and
[3:22]
one of those is
[3:24]
DOT's weekly asphalt monitor, which I gave you a
[3:28]
copy of with the package. That lists the
[3:31]
average cost of asphalt for
[3:35]
every year
[3:37]
for these contract years. I broke it down with just per year.
[3:39]
So the average cost, there's the high and the low is there, but the average is what
[3:43]
I was looking at when determining whether or not this was advantageous for
[3:47]
the town to continue this contract.
[3:50]
As you can see,
[3:52]
from the time that our bid was put out and they won their original
[3:56]
award, there's been
[3:58]
over a 34% increase in asphalt prices.
[4:01]
So I thought it was prudent of us to entertain the
[4:05]
request with this minimal increase of 3%
[4:10]
in order to keep this contract going.
[4:12]
I called around a couple of different towns.
[4:14]
They're seeing significant price increases with their recent bids.
[4:19]
And we're like, "Wow, you're getting a really good price for what you're
[4:23]
getting."
[4:25]
So I'm here before you today for this request.
[4:27]
And I think one of the key points with this particular
[4:32]
type of work that we do, this is asphalt patches that we do,
[4:35]
curbing, driveways, sidewalks, different items that we use
[4:39]
from the town's perspective for our work, but this also
[4:43]
includes work when a homeowner has work done and has a
[4:47]
water connection done or sewer connection done.
[4:49]
This pricing is what the homeowner is directly charged for the repairs
[4:53]
that the town does.
[4:55]
From our contractor, they put a bond up when they get the excavation permits.
[4:59]
Our contractor does the repair work to ensure that that's done to our standards,
[5:03]
and then we pass that cost directly on to the homeowner.
[5:05]
So this isn't just the town's project. This is also direct cost to homeowners.
[5:09]
So it's kind of prudent for us to try and keep those costs as low as we
[5:13]
can. And I definitely feel that if we were to go out to bid this year, the cost
[5:17]
would significantly increase.
[5:19]
We were seeing costs in the $10 per square foot at the
[5:23]
time this bid was done in fiscal '20 by the other contractors that
[5:27]
didn't win. So I can only assume that that would be
[5:30]
significantly more than the pricing that they've offered us for this
[5:34]
contract again.
[5:38]
Any questions? Any other questions?
[5:39]
Jen, thanks for your due diligence on this.
[5:41]
I think it's
[5:43]
excellent, and I would agree to move forward.
[5:46]
I'm good.
[5:48]
They do good work. Can I get a motion?
[5:49]
I'll make a motion to approve.
[5:50]
Second. All those in favor?
[5:52]
Aye.
[5:52]
Thank you. Motion carries. Thank you.
[5:54]
Thanks, Jen.
[5:59]
Okay, item number six, to consider, and if appropriate, approve
[6:04]
A request from Blaise Levitan, Board of Ed Chief Operating
[6:08]
Officer, and Brendan Letty, Board of Ed Facilities Director, to waive the
[6:12]
bid for fiscal year '26, '27 electrical
[6:16]
projects at Branford High School, and authorize the work to be
[6:19]
performed by McMillan Electric using the pricing and terms
[6:23]
as identified in contract 7214 between
[6:27]
McMillan J. Orris LLC and the town of
[6:31]
Greenwich, dated February 8th, 2028.
[6:37]
Hey, everybody. How's it going?
[6:38]
2020, sorry.
[6:38]
Yeah.
[6:39]
2020.
[6:40]
'22.
[6:41]
'22.
[6:41]
'22. Yep. I know there was an addendum in there.
[6:44]
Yeah, so good afternoon, everybody. Good to see you.
[6:47]
Never great following Jen,
[6:51]
but
[6:52]
we will try our best.
[6:54]
So we're back before you with a fairly similar request.
[6:57]
And just for the public's background that's watching, we came
[7:01]
here in February for a bid waiver under the same
[7:05]
contract for a very specific project at the high school to do the
[7:09]
switchgear.
[7:10]
At the same time, we were working with the
[7:14]
town administration on the solar project at the
[7:18]
high school, and we ended up shifting gears from in
[7:22]
front of the meter to a behind-the-meter approach that's now well
[7:26]
underway, and that drives a lot of other decisions.
[7:30]
So that project that we came before you to upgrade all of the switchgear
[7:34]
this summer was put on hold and will now be part of a
[7:38]
larger
[7:39]
project that will be looped in with the cogen,
[7:43]
and HVAC system replacement, as well as the
[7:46]
solar.
[7:48]
And so that way we can do some more engineering, building committee project.
[7:52]
What we're doing instead,
[7:54]
hopefully this summer, would be all of the ancillary
[7:58]
electrical components in the building instead, so that we can still stay on
[8:02]
schedule for electrical upgrades overall.
[8:04]
They'll still be done in tandem. And so
[8:08]
we're looking to really basically similarly issue an
[8:11]
award under the town of Greenwich contract pricing,
[8:15]
for the high school for the year, with the bulk of those
[8:19]
projects being specifically completed
[8:22]
this summer. Brendan is going to mention a
[8:26]
few of those high-level projects. I also put them in the memo.
[8:30]
For checking on pricing, so McMillan is based
[8:34]
out of Stratford, Connecticut, and they have
[8:37]
had a very competitive contract we attached.
[8:41]
We have the approval from both
[8:43]
the town of Greenwich,
[8:45]
and McMillan to use this
[8:48]
town contract. They still comply with all of our own
[8:52]
insurance and our terms as well, but they've honored the pricing.
[8:56]
We included in here the alternative, too,
[9:01]
with the state contract that they have.
[9:03]
That's the piggyback for electrical pricing for all
[9:07]
towns to piggyback on, and we are obviously
[9:10]
substantially lower per hour than the
[9:14]
state contract.
[9:16]
The Greenwich project, it's not like it didn't go through a competitive bid process
[9:19]
as well. So it went through a competitive bid
[9:22]
in Greenwich and this price is very
[9:27]
strong. Brendan's looked around with other
[9:31]
opportunities, similar to what Jen was just mentioning about
[9:35]
people who are honoring prices from basically that are built on a
[9:39]
base of 2022,
[9:41]
instead of this escalation that you've really seen in the last few years.
[9:44]
So we're able to take advantage of that.
[9:47]
And so that's the logic behind the request in a
[9:51]
summary. For additional context, that
[9:56]
switchgear project
[9:58]
that we were going to do this summer, the nice thing is, is by pivoting it and
[10:02]
tying it to the HVAC and
[10:06]
the
[10:08]
power system of the building, we're able-- Typically, just
[10:12]
replacing switchgear on its own because it's
[10:16]
old and no longer at its useful life is not an
[10:19]
eligible reimbursable expense in the school construction grant project,
[10:23]
but HVAC and core mechanical systems are.
[10:26]
And what we've been doing is working with our professional team to really
[10:30]
line up
[10:32]
including it so that it can be justified as part of that bigger renovation on
[10:36]
the HVAC. So that portion of the project we
[10:39]
anticipate to be now, since we're going to do it connected
[10:43]
to and make the case that it's part of the power system, specifically of the
[10:47]
building, and it powers the core HVAC components that we'll be
[10:50]
replacing. We'll be able to get the state reimbursement on the
[10:53]
non-priority grant back on top of doing it.
[10:57]
So there's actually a two-step benefit, so it really connects
[11:00]
the behind-the-meter approach that First Selectman Brooks
[11:04]
has led, which is working out.
[11:07]
Overall, the timing and everything hopefully will sync up well, and
[11:10]
then we're able to lump that into that bigger project for the
[11:14]
37% reimbursement rate back on that, too.
[11:17]
So
[11:18]
I don't know if you want to give any additional context about this specific project
[11:22]
and what they're doing at the high school.
[11:23]
No, as Billy said, we're working on a lot of projects this summer.
[11:26]
A lot of these projects that the electrical team is focusing on are
[11:30]
improving safety, security,
[11:34]
and then core
[11:37]
teaching elements, in our kitchen, in our CNA program.
[11:40]
We're addressing some of these much-needed electrical upgrades in those areas.
[11:46]
We've looked around. It's hard to beat a $68 an hour
[11:51]
electrician these days.
[11:53]
So he just partially answered the question.
[11:57]
You did look around already, so everyone knows four different pricing.
[12:01]
This was still the best pricing.
[12:03]
Well, state contracts just says it's $80 an hour according to the presentation.
[12:07]
Right. I often found, unfortunately, using state contracts in the past,
[12:11]
that they're higher than-
[12:12]
Right
[12:12]
... we can get otherwise. So it
[12:15]
seems to be convenience
[12:17]
For us to look at state bids sometimes, but they are not-
[12:20]
Right
[12:20]
... the best prices.
[12:20]
I agree. That's a good comparison. Is that $80 based on a prevailing wage?
[12:24]
Do you know, Brandon?
[12:25]
It is.
[12:25]
It is.
[12:26]
Yeah.
[12:27]
Yeah.
[12:27]
But we have had
[12:30]
other electricians in the building.
[12:31]
We've had other costs even on smaller projects where we may
[12:35]
have a general contractor working.
[12:38]
They're going to hire their own electrician. They're not being $68 an hour.
[12:41]
Right.
[12:41]
So oftentimes we're bringing in even McMellen.
[12:43]
We may have a general contractor to frame out an area, build something, and then
[12:47]
we're bringing in our own electrician just to save that money as well.
[12:50]
Yeah.
[12:50]
Now, right now,
[12:53]
because obviously
[12:55]
you're trying to get this done this summer,
[12:57]
are they already in the building doing other work where they can just transfer
[13:00]
over?
[13:02]
We only got a two-month window here, and this is kind of late for
[13:06]
us
[13:07]
to be approving a bid waiver. But I'm assuming you had to wait for funding
[13:11]
anyway.
[13:12]
But this is going to be able to get done in this time period, the project you
[13:16]
want-
[13:16]
Yes
[13:16]
... by us doing this tonight?
[13:18]
Yes.
[13:18]
Okay.
[13:19]
It's not necessarily late. It was a little bit of back and forth between the state
[13:23]
contract and how we were finding the funding.
[13:27]
So we've gone through, both with myself, our technology
[13:31]
director, our director of security, which is where a lot of these projects are
[13:34]
coming from. We walked the building with McMellen. They took a list.
[13:37]
They provided several quotes for us.
[13:40]
And now their main foreman is on vacation this
[13:44]
week for the 4th of July holiday, and then they are dedicating, essentially
[13:47]
starting next week through the end of the summer, they will have electricians on
[13:51]
site nearly every day.
[13:52]
That's what I was looking for. They're ready to go.
[13:53]
Ready to go. On site, they have material all ready to go.
[13:56]
They have a material list. They've run through everything. Yep.
[13:58]
Thanks.
[13:59]
Yeah.
[13:59]
I like the way you piggybacked on Brandon's spot. I would like to move this.
[14:02]
Second.
[14:04]
All right. All those in favor?
[14:06]
Aye.
[14:07]
Thanks, guys.
[14:08]
Aye.
[14:08]
Thanks. Appreciate it.
[14:08]
Thank you very much. Appreciate it.
[14:09]
Much obliged.
[14:12]
Good to see everybody.
[14:13]
Take care, boys. Have a good holiday.
[14:14]
See you. You too, man.
[14:17]
Peace. Not much space for my computer.
[14:21]
Okay, item number seven, to consider, and if appropriate, approve a request
[14:25]
from Gino Carano, acting superintendent
[14:28]
WPCF, to waive the bid for the purchase of two
[14:32]
replacement 45-horsepower flight
[14:35]
submersible dry pit pumps for the Damascus Road pump
[14:39]
station and award the contract to Fleet Pump and Service Group,
[14:43]
Inc., in the amount of $128,390.
[14:48]
Just to give you guys background, this is similar to last month or
[14:52]
two weeks ago, we did the same thing.
[14:54]
This is the rest of those pumps in that pump station.
[14:59]
It's replacing
[15:01]
pump to pump. So getting multiple pricing makes no
[15:05]
sense because you want the same pump doing the same job.
[15:09]
I'm good with it. You did-
[15:10]
I am, too
[15:10]
... due diligence last month.
[15:12]
Yep. I'll move it.
[15:13]
I think we should just move it.
[15:14]
Okay. All those in favor?
[15:15]
Aye.
[15:16]
Aye.
[15:16]
All right. Motion carries.
[15:18]
Thank you very much.
[15:18]
Thanks.
[15:19]
Item number eight, green use, to consider, and if appropriate, approve a
[15:23]
request from the Society of Nepalese in America for
[15:27]
the use of the town green on July 18th,
[15:30]
2026, to hold the Nepal Festival,
[15:33]
Nepal Day Parade from 10:00 a.m. to 4:00 p.m.
[15:38]
This-
[15:40]
I'll move it.
[15:40]
I'll second.
[15:41]
Any discussion?
[15:43]
All those in favor?
[15:44]
Aye.
[15:45]
Aye.
[15:45]
Motion carries.
[15:47]
Item number nine, correspondence. We have none.
[15:50]
Item number 10, other. Is there anything else
[15:54]
to come before us?
[15:56]
Okay. Item number 11, adjournment.
[15:58]
I'll move it.
[15:58]
Can I get a motion?
[15:59]
Second.
[16:01]
All those in favor?
[16:02]
Aye.
[16:03]
Aye.
[16:03]
We're adjourned.
[16:05]
This program was brought to you in part through the support of the town of
[16:09]
Branford.
[16:11]
Watch town meetings and other videos on demand at
[16:14]
branfordtd.org.