Good evening. Welcome to this Brownsburg town working session. Today, our meeting will focus on the design aspect of the Brownsburg Aquatic Center Project.
[0:17]
We appreciate everyone's presence this evening, and participation in this matter tonight is important.
[0:22]
The event is going to start with a presentation by Williams Architect. They are a consultant.
[0:27]
After the presentation, there will be a Q&A session where you can ask questions. If you'd like to ask a question publicly, please add your name to a sign-up sheet at the back of the room.
[0:36]
Each speaker will be given three minutes to speak and introduce a topic, a new topic for discussion.
[0:41]
And finally, there will be a breakout session so that you can provide feedback on designs for the aquatic center.
[0:45]
So once we get through the presentation, you get your questions asked, we will answer those questions,
[0:51]
then there'll be a further breakout session where we'll go to the side boost here to talk to each person individually.
[1:03]
At the start of the meeting, you were given a comment card.
[1:05]
If you must leave before the meeting concludes,
[1:07]
please fill out the card and hand it back to one of our staff members.
[1:10]
Your feedback will be used to create an online Frequently Asked Questions section
[1:14]
addressing any questions or concerns you may have expressed.
[1:17]
If you're watching from home, you can leave us a comment online
[1:19]
at brownsburg.org forward slash aquatic center.
[1:23]
Now, Williams Architects is ready if you want to come up here
[1:25]
and begin your presentation.
[1:33]
Is the microphone working?
[1:34]
All right. So I'm going to just jump right in.
[1:43]
I will let the, sorry, before you get started there, I'll make one further announcement too while we're doing this and for the folks online.
[1:52]
We're going to be having two additional public input sessions for the Aquatic Center.
[1:57]
Those dates will be November 2, which is two weeks from today.
[2:02]
And the next meeting will be November 14, which is almost a month from today.
[2:08]
It's four weeks from today, minus a day.
[2:10]
It'll be that Wednesday, the 14th.
[2:13]
And then we will have the meeting start times and all that information post online when we finalize the starting times.
[2:21]
But those will be the dates.
[2:22]
All right.
[2:22]
Sorry, Ted, go ahead.
[2:23]
All right.
[2:25]
Today, for the Aquatic Center, we're going to be sharing information about the building program.
[2:30]
And then I'm going to share a high level site plan that kind of puts the site in context.
[2:36]
and then we'll look at main and upper level plans of the building. George will
[2:42]
jump in at that point and talk in a little more detail about the poor bodies
[2:46]
themselves and then I'll share the exterior renderings of the building.
[2:50]
We'll touch on what the budget is expected to be and then we'll answer
[2:55]
questions after that.
[2:58]
First, so this is a written description of what's
[3:02]
included in the building itself.
[3:05]
Big picture, it's about 24,000 square feet, slightly less.
[3:10]
The largest component is obviously
[3:12]
the indoor aquatics portion of the building
[3:15]
at about 7,000 square feet.
[3:17]
And then we have support facilities,
[3:20]
locker areas, changing rooms, et cetera.
[3:24]
Customer service aspects of the building are next.
[3:29]
And then we do have some multi-use rooms.
[3:32]
I'll talk about that in more detail
[3:33]
when I share the plans.
[3:35]
And then obviously the support spaces
[3:37]
that are needed to run the building.
[3:41]
You'll see a component on this program.
[3:44]
It's called Parks and Rec Administration.
[3:46]
That's called out as zero right now.
[3:49]
During the original RFP for the project,
[3:52]
it was anticipated that the building might have
[3:55]
Parks and Rec staff offices in it,
[3:57]
but we've made the decision to remove them from the program at this point in favor of
[4:04]
including additional multi-use rooms for the community.
[4:09]
And then the last chunk of the space is the common space, which would include the lobby
[4:14]
area, toilet support, et cetera, and then an observation mezzanine that I'll show
[4:19]
you on the plan, and then some miscellaneous square footage that's kind of built in
[4:24]
the plan.
[4:27]
This is a big picture view of the chunk of the site that we're using off of
[4:35]
West Main Street for the building. You can see at the bottom there is the building itself
[4:40]
in the pool. It shows that we're including approximately at this point 160 total parking
[4:48]
stalls, but according to the zoning requirements, we need the land bank additional space for
[4:55]
parking stalls. So that's kind of the green space between Main Street and then the parking
[5:01]
lot you see there. And then off to the side is a potential future parking area. We just
[5:07]
sketched that in because it was part of the kind of the overall master plan that
[5:12]
we had access to.
[5:16]
Next, so now I'm going to jump in. This is the main level plan itself.
[5:22]
You can see at the front of the building is the main entry to the building is here.
[5:31]
It enters into a public lobby space that kind of is controlled and monitored by this desk
[5:39]
right here which would be the admissions desk for the entire pool area. There's
[5:44]
that you enter here into a common locker space area
[5:48]
and the direction we went with this in lieu of
[5:52]
like men's and women's locker rooms
[5:55]
are 14 unisex changing rooms.
[6:03]
I think it results in probably a little less square footage
[6:06]
dedicated to that kind of that overall area
[6:08]
plus it increases functionality I would say.
[6:12]
kind of an ancillary benefit to it is the lockers end up being out in the public spaces,
[6:19]
which mean then you can be, those can be covered by cameras if you choose. It's kind of a way
[6:24]
to help prevent theft. So those areas are here. Let me get my cursor. That's this area here.
[6:34]
All of these, each of these little rooms here is a changing area. It's toilet, shower,
[6:39]
sink combination blockers in this area here and then we call it a groom and
[6:45]
counter shared countertop space. So from this area you can enter the indoor
[6:52]
nadatorium at this point. During during the summer season when the outdoor pool
[6:59]
is open you'd go down this hallway here and you'd enter the outdoor pool
[7:05]
environment kind of through this vestibule. So adjacent to the outdoor pool on the building
[7:12]
side of things is the one multi, we call it a multi-use room. It's intended to be focused
[7:18]
on rental for birthday parties and things like that. The program also includes a concessions
[7:26]
area right here. The intent behind that, the way it's laid out right now is we have
[7:32]
a service window. We call it behind the fence of the pool so we could serve the pool area
[7:39]
but since the building is part of the bigger master plan for the whole park we did want
[7:44]
to allow for the opportunity for the concessions to be open while the outdoor pool is closed.
[7:53]
So we have made two service windows for that concessions right now. This here is a building
[8:00]
mechanical space.
[8:04]
This is a slight difference from the early iterations of the plan and it was
[8:08]
all done on the interest of saving money based on information from our mechanical engineers
[8:15]
on that project. Behind the outdoor or behind the indoor pool at the back of the building is
[8:21]
the pool mechanical room and that would serve both the indoor pool and the outdoor pool.
[8:28]
So, the outdoor pool, deck space around the activity pool with a zero entry edge, and
[8:38]
then we call this the Lazy River area here, like a current channel type of the thing.
[8:45]
Seating around kind of the perimeter of the paved area, some canopies for shade in this
[8:54]
area and then an area of turf right there. This here at the back is the, is a water slide.
[9:01]
So two water slides actually, what do we call them? Those are the run-out slides, run-out
[9:08]
slides, two run-out slides. So they, the intent there is you'd, instead of those slides
[9:14]
going into the pool itself, you'd run out and slow down. That's what these lengths
[9:19]
here are there. I'm going to jump quick to the upper level and then come back to
[9:26]
this one. So this is the upper level of the building, open to below at the public
[9:34]
lobby space in front and then the indoor and auditorium at the back. This is
[9:40]
the space that was originally intended for Parks and Rec office space but
[9:46]
instead during design we've changed it to two multi-use rooms each at about 800 square feet
[9:53]
and those on the pool side they front like cursor go they they kind of the doors are off that
[10:00]
observation deck and the intent behind that is a glass wall that separates that space from the
[10:07]
pool below but that would be the spot where parents would be able to see into the pool
[10:13]
while kids are in swim lessons, things like that.
[10:17]
And then the last component on the upper level
[10:19]
is this outdoor terrace on the right side of the plan.
[10:23]
Right here.
[10:27]
I think that covers generally the building plan.
[10:30]
I'm gonna let Jor, too early, too early.
[10:36]
Back to my,
[10:41]
yeah, get back to my plan.
[10:42]
Sorry.
[10:47]
Go.
[10:54]
Hey, good evening.
[10:55]
So the one thing we wanted to talk about
[10:58]
was really just the vision behind, including the bodies of water that we did. We wanted
[11:05]
to be very intentional about providing opportunities for the entire community. And so at the outset
[11:13]
that really went toward having indoor and outdoor water. Anytime we do outdoor aquatics
[11:22]
only the question inevitably arises well that's that's great for 80 to 85 days
[11:28]
out of the year but what about what about the rest of the year and so having
[11:32]
this layout with the two bodies of water they really complement each other in
[11:35]
terms of being able to offer the community aquatic opportunities on a
[11:39]
year-round basis you know starting with the outdoor pool anytime we design
[11:43]
an outdoor aquatic area we always want to have capacity we want to have
[11:50]
thrill attractions and we want to have children's areas and those are the three
[11:53]
main things that we want to incorporate into any design for outdoor
[11:57]
aquatics and so with this plan we have all three of those we have the lazy river
[12:01]
and you know shallow area as our capacity holder we have the water
[12:08]
slides as the thrill attraction and then we also have the large zero depth
[12:13]
entry with the different vertical sprays and plays for the children and
[12:18]
And so we can really encompass something that will accommodate families together on the outdoor
[12:25]
side and then complement that, you know, that water can also serve as programmable water
[12:31]
in the summertime.
[12:32]
You can run swim lessons out there.
[12:34]
You can do resistance walking in the Lazy River before it opens to the public in
[12:38]
the morning.
[12:40]
And then on the indoor side, we really looked at, you know, A, that since the high school
[12:46]
does have the 50 meter facility that we don't need this to be a large competitive venue but
[12:52]
we wanted to incorporate some lap lanes for fitness swimming and then those can also double
[12:57]
as good space for swimming lessons and water fitness classes but then also complement that
[13:03]
with a zero depth entry again inside that we can have year round recreation for families
[13:10]
and so specifically with the indoor side you know three lap lanes doesn't seem like a lot
[13:16]
but that area can encompass, you know, six to nine lap swimmers at any given time.
[13:21]
If you ran swim lessons at both ends, you could fit 24 to 30 kids just in that three-lane lap area
[13:28]
in the morning and evening time every 40 to 45 minutes.
[13:33]
If you're having a water fitness class, you know, you could have close to 30 people in that area,
[13:39]
and so it can really accommodate a lot of different functions,
[13:42]
A lot of the indoor recreational pools that we end up designing do have that minimum of
[13:47]
three lap lanes just because it is such a versatile space and body of water.
[13:53]
And then on the zero depth entry side, that's a great way to incorporate some ground sprays
[13:59]
to have the younger kids in swimming lessons.
[14:02]
So right here at the base of the zero depth entry, right here where we're getting
[14:09]
down to that three foot.
[14:10]
So we have you know some two and a half feet along this wall that we could run swimming lessons this way
[14:15]
We'd have a three-foot area right here that we could run swimming lessons that way
[14:19]
And so it is a great area functionally speaking where you could still have you know
[14:24]
Swimming lessons going on in that shallow area, but then have lap swimming or water fitness going on in the lap
[14:29]
Lane so we wanted to try to make sure that we had the proper spaces indoors to accommodate
[14:33]
You know different types of aquatic programs all throughout the year
[14:47]
Namna
[14:48]
move to the exterior of the building, some images that we want to share.
[14:54]
Right now, as far as the overall process, we just finished what we call schematic design.
[15:00]
Which is the first design phase of the project. We finished that about three weeks ago.
[15:07]
Technology nowadays lets you make photo realistic images of something that is at the very beginning of the design process.
[15:14]
But I wanted to share images that we find attractive for this whole facility.
[15:22]
Go back to the front. This is having
[15:28]
trouble controlling my,
[15:35]
going to use the old way.
[15:36]
There
[16:00]
we go. So this is the front of the facility that behind the two story glass
[16:05]
wall that you see there that's the main lobby space for the building. This is
[16:10]
facing you know north approximately north and it faces that parking lot
[16:18]
that's out in front of the building. Over here on the left side here these
[16:22]
are these are where those concession windows would be and then these
[16:26]
This would be the stair up to that outdoor terrace on the second level.
[16:35]
This is the side of the building, the side opposite the building of the pool area.
[16:43]
Material-wise, we're trying to work with a couple of different materials.
[16:48]
The gray panels, that's a smooth metal panel, the darker gray, that's a corrugated metal
[16:57]
panel.
[16:58]
and then that masonry in the middle is kind of an Indiana limestone color of masonry.
[17:06]
As part of this, like I said, we're just leaving schematic design, one of the efforts we've
[17:11]
been going through with the committee is reducing the amount of glass to a level that is acceptable.
[17:24]
This is a view of the pool side of the building.
[17:27]
we're standing on the concessions deck.
[17:32]
One of the things you might notice in here is the concessions deck is fenced off from
[17:38]
the pool itself.
[17:41]
The intention behind that is, again, because the building is part of the bigger park, theoretically
[17:47]
you'd be able to use the concession deck even when the outdoor pool is closed.
[17:58]
bird's eye view of the entire facility.
[18:03]
Any comments on that George?
[18:08]
One of the
[18:08]
things I think this is a good slide to use to talk a little bit about some of
[18:13]
the organization that one of the reasons why the the plan is organized the way
[18:19]
it is is because we wanted to reserve space kind of toward the bottom of the
[18:24]
plan that would be a potential future location for deeper water you obviously
[18:30]
don't need to make that decision now but you know if the outdoor pool wanted in
[18:34]
addition it would happen kind of in that area and then you can see behind
[18:38]
the building the trees over there that's part of the park but the master
[18:45]
plan did anticipate at some point possibly doing an addition onto this
[18:49]
building so that would be the side we would add on.
[18:58]
So another view of the indoor or the outdoor
[19:01]
pool area, this area, kind of this area right here in particular, that's the lifeguards and pool
[19:11]
managers portion of the building. The intention behind that is both the manager and the lifeguards,
[19:20]
is they need good visibility of the entire outdoor pool area.
[19:23]
So that's why they're kind of on this corner.
[19:26]
So they get that visibility.
[19:28]
Something else you might notice
[19:30]
is the outdoor pool is a few feet lower
[19:36]
than the indoor pool as far as where the floor level
[19:40]
would be at.
[19:43]
That was done intentionally because of the site.
[19:45]
it's if you've been out there the site kind of crowns right underneath the
[19:52]
existing site crowns kind of right underneath where our building is so
[19:56]
we're trying to minimum or reduce costs from a grading side of things to fit
[20:03]
within our budget.
[20:08]
Another view of the pool that you can see some of the play
[20:14]
features that we're starting to show at the zero entry edge of the activity pool, those
[20:21]
features haven't really been selected at this point. We're still kind of working through
[20:25]
that. That's the next step of the process. But we wanted to show you some examples
[20:30]
of the types of features that would be in that water.
[20:40]
Next, I'll just touch briefly
[20:42]
Especially on the budget for the project, during the RFP the budget was set at $18 million.
[20:49]
We've been tracking it kind of through the overall design process and as we've made adjustments
[20:56]
to the plans during that process, the numbers are starting to are tracking just slightly
[21:02]
lower according to this early budgeting of $48,000 less than we were at the beginning
[21:09]
of the process.
[21:16]
Thank you Ted. Megan, do you have a list of everyone who's great? Thank you.
[21:22]
All right, so we're going to begin the Q&A session by calling out the names of the participants who signed up in order of their registration.
[21:30]
As a reminder, each speaker has a maximum of three minutes to share their thoughts and ideas on a new topic of discussion related to the project's design.
[21:38]
Your valuable feedback is essentially making this project a success.
[21:42]
After the Q&A, we'll answer all the questions and then move into breakout session to gather more feedback.
[21:47]
Megan, I believe you're going to be capturing all the questions and then George and Ted will be answering those.
[21:55]
All right, great.
[21:58]
We have three names tonight.
[22:02]
The first one will be Clayton McCrindle.
[22:05]
Good
[22:14]
evening, everyone. Thanks for the time. First, counselors, I want to say thank you
[22:17]
for setting up the two additional informational sessions. That was a request we had at the
[22:21]
council meeting, and I appreciate that you heard us and listened to that request.
[22:26]
I'll start out by saying not sure why we're only talking about the design. It sounds
[22:31]
like this is a done deal. That's a tough one for a taxpayer to just take on the
[22:36]
chin. The location, I'm really concerned about that in relation to the water table,
[22:40]
how close it is to the creek, how close it is to the sewage plant. So I want to understand
[22:44]
that part of it. As far as the budget goes, we have 18 million in our budget for 2024.
[22:53]
The first slide shown showed 23 million, and then there was a 17 point something million
[23:01]
at the end. So pretty confused about those numbers and where this is going to end up,
[23:05]
especially when Plainfield's Aquatic Center costs $25 million.
[23:09]
So, really interested to hear how we're going to keep those costs in check,
[23:14]
especially when we're all taking a 5% tax increase on the chin, too.
[23:20]
Next one, we struggled to keep the splash pad open all summer.
[23:24]
How are we going to keep a pool open all year?
[23:28]
And then we got recurring costs from this.
[23:31]
There's currently a shortage of lifeguards.
[23:33]
I don't know how many of this requires, but we can't even keep the
[23:36]
Brownsburg editorial room open for the public because we can't staff it with
[23:39]
lifeguards so I'm interested to know how we're going to get those lifeguards and
[23:47]
then the last question I have is just what does this do to our town's liability
[23:50]
insurance I don't know where that where that comes from someone's going to get
[23:55]
hurt here someone's going to sue the town how are we planning to cover that
[23:59]
that's my time thank you
[24:04]
Ron Matthews
[24:14]
so when we do a cost analysis of
[24:18]
everything, what it's going to cost the town. Are we looking at the return on
[24:25]
investment as well? So let's say you, it costs us $300,000 to run this every year.
[24:33]
Are we looking at just the membership fees we're getting back? Because I
[24:39]
actually talked to several local places, I called up and talked to Carmel,
[24:44]
And they had told me that all their businesses substantially amount of
[24:52]
increase during the time that they have people coming into their community.
[24:58]
There's a lot of intangible items that this will bring to our community.
[25:03]
I talked to a couple places in Splash Island, I mean not Splash Island,
[25:14]
in Lebanon and other surrounding places that have Aquatic Center the whole town
[25:20]
benefits. When I talked to Mayor Myers I believe is what his name was he told me
[25:28]
that he believes that when they added Freedom Springs it was a really big
[25:35]
boost to Greenwood it helped there it pushed their Center Grove didn't need
[25:40]
but it pushed property values as well. Everybody knows just like you said you
[25:45]
push property values up. Town council gets a little bit more money coming back
[25:50]
into town on our taxes so the higher the property values are the better return
[25:55]
you're going to get. So I I would encourage everyone to look into not
[26:04]
only what it costs to run but also reach out to every community because
[26:09]
Is everybody saying what's this going to cost, what's this going to cost?
[26:15]
When Freedom Springs did their analysis back in 2015, they were told they were going to
[26:20]
lose $200,000 a year.
[26:23]
They made $300,000.
[26:25]
So even the experts don't know.
[26:27]
They were off by half a million dollars.
[26:30]
That's a pretty big swing.
[26:33]
In black and white you can check with Indie Star.
[26:36]
They did a page on it.
[26:37]
That's where I got my information on it.
[26:40]
And then Chris, I wanted to tell you that I'm in your ward
[26:45]
and I talk to all our neighbors and they want this.
[26:49]
We don't have the luxury of having an HOA with a pool.
[26:53]
I know some of the council members might
[26:58]
or incoming may have, you know, into HOAs
[27:01]
and things like that, but you do have to take
[27:05]
effective all of Brownsburg even some that that don't want it but and I can't I
[27:11]
haven't seen any reliable statistic from the parts department over two or three
[27:17]
years that came back negative thank you and our last speaker tonight the one
[27:34]
good evening council members members of the audience members watching on the
[27:40]
web this
[27:43]
really boils down to a pretty simple question will the community
[27:48]
commit $18 million to fund this quality of life amenity available for all
[27:52]
residents use? Yes or no?
[27:56]
All issues beyond that are subordinate to that
[27:59]
question. You will either do this or you will not. Now that oversimplifies things
[28:07]
but you know there's a common sense logic and reason would say if there's a
[28:11]
will, there's a way. This can be done. Now, I have a public face and I have a private
[28:20]
face. My private face, I have been working to collaborate with the detractors and the
[28:25]
supporters of this project.
[28:28]
So we've heard that, you know, this is going to be a tax
[28:31]
increase and we're going to have a 5% levy. This is a 5% levy increase, not a tax increase
[28:36]
by the way. But the money is already in the budget now because they're paying
[28:40]
for Town Hall. When that bond rolls off, we have the monies readily available. It certainly
[28:44]
could be directed to some other use, but we could make a decision to direct them to this
[28:48]
purpose.
[28:51]
So what does that cost an average taxpayer? $51 a year. What does that cost
[28:56]
over the life of the bond? $1,100 a year. That's really what we're asking the community
[29:02]
is, do you want to spend this money for this amenity? Now if the answer is no,
[29:07]
I have to question when, because some of you have been in the room long enough to know that we've made three attempts at this.
[29:17]
We were told in the past, oh, just wait for 3% growth. We'll get that money and we'll be able to do that then.
[29:24]
Now, certainly that's on the way, but Town Center was one of those big things.
[29:28]
As that money comes in, are we going to revisit this again, or is the answer always going to be no?
[29:33]
And if the answers already know, well then, okay, that's fine, but that kind of goes to the first postulate.
[29:40]
We will either do this or not.
[29:42]
But it's in the context of what? Population will continue to increase.
[29:46]
Assessed value will continue to increase.
[29:50]
As a result, this investment of $18 million will grow smaller of a population of our current worth over time.
[29:57]
As will that expense for the budget
[30:00]
Total budget. That expense will also decrease as a portion of our operating expense over time.
[30:06]
So we can't look at this just from today's window. We can also look at this one, three, five, seven, ten, and so far out.
[30:15]
But do we do this amenity now?
[30:18]
And that's the question before you as public servants and decision makers.
[30:22]
And that's the question before our public that's in the room and those are asking on the web.
[30:26]
I don't have an answer for that.
[30:28]
I mean, I have a personal answer, but I'm just trying to advocate for the media and to say,
[30:33]
are we working through this and get to the right solution?
[30:36]
Thank you for your time.
[30:40]
All right. Thank you for our speakers tonight.
[30:45]
Megan, did you get all the response?
[30:46]
I know some were more statements than there were questions, but there were a few questions in there.
[30:51]
Some were probably for William.
[30:53]
Some were maybe for us.
[30:54]
We probably don't have all those questions to be answered today.
[30:57]
We'll get through what we can.
[30:59]
Sean or Debbie, you might have some answers to those questions.
[31:05]
George and Teneffy want to go back to the podium.
[31:08]
I guess we can take these one by one.
[31:16]
The first question is, how close is it to the sewage plant and the water table?
[31:25]
Sean, that might be more of a question for you.
[31:29]
It's it's not in the back yard. It's I can't tell you the exact fee we can get that out in the FAQ, but it is near
[31:36]
adjacent
[31:38]
There's homes way closer to the pool or to the sanitary plant than this and with that note
[31:43]
We've also had people from all over the country come to our plant
[31:47]
To investigate why and how we operate
[31:50]
Because we have minimal odors that do
[31:53]
Come out of our plant
[31:54]
So we can get the exact distance in the FAQ, the water table, I could probably take that one.
[32:01]
It is near the flood plain and is not in the flood plain.
[32:05]
Our consultant can probably help with the exact depth, but it should be well above the water table.
[32:11]
We should be getting soil borings shortly.
[32:14]
Yes.
[32:22]
The next, I'm sorry, the next question is there seems to be a confusion between a slide
[32:29]
that said 25 million and one that said 18.
[32:32]
Can you expand upon the difference?
[32:34]
23 million and the last one was 17.9.
[32:38]
I don't remember the 23 million on the slide.
[32:42]
That was square footage.
[32:43]
Was that square footage?
[32:45]
Well, there's 20, yeah, it was 24,000 square feet of building.
[32:48]
Can you pull that up just to make sure we can so
[33:07]
here's the
[33:15]
There's the budget right 17.99 from the RFP we our target was 18 million dollars
[33:23]
So that's where that's where this number came from. Can you go to the very first line? Yeah, I
[33:30]
think
[33:44]
Maybe it was this slide.
[33:45]
I think that 23770 is probably what he was talking about.
[33:48]
That was square footage.
[33:49]
Yeah, this is square footage of the building.
[33:55]
Next.
[33:56]
The next question is, we struggled to keep the splash pad open all summer.
[34:01]
How will the pool remain open?
[34:03]
Yeah, that's a good question.
[34:05]
And we've had discussions with that ourselves as a council.
[34:09]
And there are some major issues when the splash pad was built that we have concerns over.
[34:14]
And we're trying to figure out not only was it splash pad being built, but we're trying
[34:20]
to determine too if there was any errors in the winterization of that property, and that
[34:26]
could have been done by whether our staff or by the people that we employ to do that
[34:31]
for us.
[34:31]
We're trying to figure that out.
[34:33]
And if it wasn't our staff, then hopefully we can have some restitution for that
[34:39]
project.
[34:39]
But I don't know, Amber or Sean, if one of you
[34:42]
want to get some further clarification to the splash pad.
[34:46]
I think also it'll be important that some of the documents
[34:50]
that we would get from this project
[34:52]
would include close-out lists on an asset replacement plan
[34:58]
so that we can get ahead of pumps and things that
[35:01]
need to be replaced and get them in the budget year
[35:04]
on year and replace them ahead of the time.
[35:06]
So not waiting for something to break,
[35:08]
but actually budgeting appropriately. And when we hopefully redo the splash pad, that
[35:14]
is something that I know I've talked to with Sean about implementing for the splash pad
[35:19]
so we can get our maintenance a little bit ahead of the game instead of waiting for things
[35:23]
to break.
[35:23]
And that's one of the things when we put in these future public input sessions is
[35:27]
when we have the, what the performer looks like in the ROI on it, we just don't have
[35:31]
it yet. I know the team here at TED and George are working on it. And that's
[35:36]
One thing that's good to point out is make sure we have maintenance included in that.
[35:40]
I'm sure you probably do.
[35:42]
Okay.
[35:43]
I'd like to add that you can correct me if I'm wrong, Amber, but the splash pad is nearing
[35:47]
or beyond some of its expected life, some of those items.
[35:52]
So we did budget quite a bit of money to reconstruct in 24.
[35:59]
Thank you.
[36:00]
All right.
[36:00]
Next question.
[36:04]
The next question was regarding the shortage of lifeguards.
[36:08]
How will we get lifeguards?
[36:11]
I will read that to someone who's more an expert than I am.
[36:16]
So I know that Council has talked about this,
[36:18]
and we've talked about this internally with HR,
[36:20]
that we are looking to possible third-party consultants
[36:25]
to help with hiring lifeguards.
[36:28]
And then, of course, as always, we have, you know, teens, people out of school.
[36:35]
I think there's a lot of folks looking for jobs.
[36:38]
So we would just come up with a plan, a recruitment plan,
[36:43]
whether that be a third party or us hiring or a mix.
[36:47]
It could possibly be a mix.
[36:49]
But again, that's something that in our business plan we will be assessing out.
[36:58]
The liability insurance for the town of Brownsburg.
[37:00]
how do we plan to cover any increases?
[37:04]
Yeah, but we talked to Rick about that.
[37:07]
Yeah, this has been discussed and it would be added just as any program is added as it comes online.
[37:16]
And as other programs might change or roll off that those are included, you know, as are all our assets.
[37:23]
So, yeah, we have to figure out the scope and the size and everything before we get an accurate amount.
[37:35]
Host of analysis, are we looking at the ROI?
[37:39]
Yes.
[37:41]
We don't have it yet, but that is one of the very first things that we've spoken about,
[37:45]
is make sure we have a good return on investment for this project.
[37:50]
Including we're looking at membership fees, just to answer that.
[37:54]
That was in the next question, are we looking at membership fees?
[37:57]
Yes, we are.
[38:03]
As well as in-town and out-of-town resident rates.
[38:13]
What is the cost to the average taxpayer for a facility like this?
[38:20]
I'll tell my head I don't know until we dive into that and see the final numbers.
[38:25]
We do the ROI and everything like that too.
[38:29]
The other ones were questions, but I think they were more statements like,
[38:32]
Is the community going to commit to this and are they going to commit now?
[38:38]
Well, I mean, I wouldn't say this is a done deal by any stretch of imagination.
[38:44]
That's why we're doing these public input sessions.
[38:46]
See if the public wants it.
[38:48]
I think one of the biggest questions that I get asked and I think other counselors get asked is,
[38:53]
what are we going to bring forward for the community?
[38:56]
Whether it be a pool or some kind of amenities and activities for the community outside of what we've provided.
[39:00]
Provided and I think us as a council said have said numerous times like we can't afford it right now
[39:07]
And that's the reason we're doing all the the bidding of the commercial growth that we've had in our community the last three or four years
[39:14]
right a point now where
[39:16]
someone brought up that the bonding on this
[39:19]
Building is going to be falling off, which is very true as well as the three percent growth that we've seen
[39:25]
Brownsburg's in a better spot financially than
[39:28]
than we've ever been
[39:30]
This is at least my eight or nine years involved here.
[39:35]
That's the end of your questions.
[39:36]
All right. Thank you.
[39:38]
So now what we're going to do is we're going to have a breakout session.
[39:41]
So let's try to split this up as evenly as possible.
[39:43]
Have the room go over here, have the room over here.
[39:45]
And I really think we're about even if you take a look at the room.
[39:48]
So just have the side of this side, this half over here.
[39:53]
At the beginning of the meeting, we're giving a comment card.
[39:56]
If you leave tonight, can you please felt that comment card handed one of the staff
[39:59]
as you leave?
[40:01]
Your feedback will be collected and provided in an online document.
[40:05]
So we are taking that seriously, all the comments and requests that we get and questions
[40:09]
that we get.
[40:09]
So we'll try to answer all those as best of our ability.
[40:12]
And that's what we're going to do also at these stations is to kind of have a
[40:17]
question and answer session.
[40:21]
Yeah, let's go ahead and do that.
[40:24]
We'll have council members at each one, as well as staff at each side as well.